HomeMy WebLinkAbout03-15-1993PUBliC WO S CO ITTEE MINUTES RCH lS, 1993
CITY OF
The meeting was called to order a~T~!~,.~.Those in attendance
were Committee Chairman Rich Wagner, Councl'~mber Pat Burns, and
Councilmember Mike Weekley. Staff in attendance were Public
Works Director Frank A. Currie, Senior Engineer Dennis Selle,
Utilities Engineer Rod Linja, and Water Quality Compliance
Officer Chris Thorn.
ISSUES
A. ORDINANCE NO. 4616 - AMENDING AUBURN CITY CODE CHAPTER
10.36 BY ADDING A NEW SUB-SECTION TO COMMERCIAL LOADING
ZONES WITHIN THE CITY (To install a single space
loading zone for the adjacent commercial property owner
to serve his handicapped and/or weak patients. This
business rents medical equipment for home use and
customers need special access to his business. See
reference map)
Public Works Director Frank A. Currie described the
Amendment to Ordinance No. 4616, and the Committee
recommended approval to the Council at their March 15,
1993 meeting.
B, ORDINANCE NO. 4617 - AMENDING AUBURN CITY CODE CHAPTER
10.36 BY ADDING A NEW SUB-SECTION TO PASSENGER LOADING
ZONES WITHIN THE CITY (To install a single space
loading zone for the adjacent commercial property owner
to serve those visitors who may be handicapped and/or
especially weak. This business provides physical
rehabilitation services to those needing this special
service. See reference map.)
Public Works Director Frank A. Currie explained the
Amendment to Ordinance No. 4617, correction noted on
page one, Section 1, 'L' Street to 'H' street. The
Committee recommended approval to the Council at their
March 15, 1993 meeting.
C. GREEN RIVER TRAIL/REGIONAL STORMWATER DETENTION
IMPROVEMENTS - AUTHORIZING THE AUBURN PARKS AND
RECREATION AND PUBLIC WORKS DEPARTMENTS TO ADVERTISE
FOR A CONSULTANT TO DEVELOP A MASTER SITE PLAN (This is
to be a master plan incorporating both the trail and
the storm water ponds needed along the Green River. A
graphic display will be provided to show the intended
stormwater detention site.)
Utilities Engineer Rod Linja and Water Quality
Compliance Officer Chris Thorn described the need for a
PUBLIC WORKS COMMITTEE MINUTES MARCH 15, 1993
Page 2
consultant to develop a master plan for the Green River
Trail. The Committee recommended approval to the
Council at their March 15, 1993 meeting.
D. CHANGE ORDER AGREEMENT NO. 1 - TO VIRGINIA L. SEITZ
CONSTRUCTION COMPANY FOR THE 1992 UTILITY IMPROVEMENT
PROJECT, PROJECT 506, CONTRACT 92-04, WATER IMP. 192,
SEWER IMP. 86 AND STREET IMP. 307 IN THE AMOUNT OF
EIGHT THOUSAND SEVEN HUNDRED THIRTY-EIGHT DOLLARS AND
EIGHTEEN CENTS ($8,738.18) (For various minor
adjustments and changes that have been necessary to the
continued project construction. See reference map).
Public Works Director Frank A. Currie presented Change
Order Agreement No. 1 to the Committee, and they
recommended approval to the Council at their March 15,
1993 meeting.
DISCUSSION
Senior Engineer Dennis Selle presented a restructured
version of the 1993 Sidewalk LID Program.
1. Design and acquired right-of-way for the Auburn
Way corridor to be eligible for the proposed 1993
Federal program for construction. Utilizing grant
monies, the construction of sidewalk along the
corridor is proposed to be completed this year.
2. Perform design work and acquired right-of-way for
the sidewalk program located in the northeast
portion of the City this year. Proposed to form a
Local Improvement District for this area in early
1994 with construction in the same year.
Senior Engineer and Public Works Director Frank A. Currie
discussed the 37th Street LID in regard to the low income
tenants.
There being no further business to come before the Council, the
meeting was adjourned at 6:30 p.m.
LS/bd
REF. H:\ENGINEER\E93\E93-254