STORM WATER EASEMENT AND MAINTENANCE AGREEMENT (East & West),., io
(FAC01-0039) _
Reference It (il'applicable): N/A Additional on page: a a
Grantor/Borrower: 1) Charles P. Schroeder and 2) f to
fa m'q
Brenda M. Leyda their separate a n
/ Estates
Additional on page: ~a ? .
~Grantee/Assignee/Beneficiary: City of Auburn
,p T
Legal Description/STR: E ''/2, NW '/4, NE '/4, 17-21-05E Additional on page: m
f 3
Assessor's 'Tax Parcel 1D#: 332790-0270 & 172105-9099 to
FILED BY F'NWr o
("J 3L11 Z-12
THIS EASEMENT AND AGREEMENT made and entered into this day of
200a--, by and between the City of Auburn, a municipal corporation of'
= King County ashington, hereinafter referred to as "CITY" and Charles P. Schroeder and
Brenda M. Leyda their separate estates, located at 16608 SE 331 St., Auburn, WA 98092,
hereinafter referred to as "PROPERTY OWNER".
o
.cv
WHEREAS, :PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at 111XX SE 320`" Street which create impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a stone system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of.-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
Storm Water Easement and. Maintenance Agreement - East & West
Page 1 of 10
EXCISE TAX NOT REQUIRED
King Co R r Division
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
C NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
CTI
THE PARTIES AGREE AS FOLLOWS:
Q.;
0
c~ Section 1, EASEMENT
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
<Z) property as showing on the approved Record Drawings revised pursuant to construction records
CN,1 for the City of Auburn under Permit No. FACO1-0039, which Record Drawings are hereby
incorporated by reference as if set out in full. This easement shall be a burden to that real estate
which is legally described and attached as Exhibit A and incorporated herein by this reference,
and shall be of benefit to the City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties. .
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure, which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he/she/they/it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY.
Storm Water Easement and Maintenance Agreement - East & West
Page 2 of 10
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
CITY OF AUBURN
DIRECTOR OF PUBLIC WOR*
2,
Owner Date
Cn
YT%
tm
c-i
CL
G
C1.4
N
c~
C'v
Storm Water Easement and Maintenance Agreement East & West
Page 3of10
STATE OF WASHINGTON)
)ss.
County of King )
I certify that I know or have satisfactory evidence that z$ h,#/lle3 / ' Jck)e~t-e ex
and Jlh - e-
is/are the person(s) who appeared before me, and sai individual(s) acknowledged that
he/she/they signed this instrument and acknowledged it to be his/her/their free and voluntary act
for the uses and purposes mentioned in this instrument.
Dated- / 7-d 2--
SC -1
9%,
_
~
°
4liQ,'•yg101V 0
to
0
c,
-
Q :'o NOTAR y V. M
CO
C
3
:
Pwur'
-
V
" r
STATE OF WASHINGTON)
)ss.
County of King
Notary Public in and for the State of Washington
residing at
My appointment expires
I certify that I know or have satisfactory evidence that S
is the person who appeared befor e, and'said person acknowledged that ed this'J
instrument, on oath stated that Ws authorized to execute the instrument and acknowledged it
as the DIRECTOR OF PUBLIC WORKS of THE CITY OF AUBURN to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
Dated 6,1 !o -0Z
CSI b n A - t---1i0 V;
Notary Publi 'n and for th State of Washington
residing at ,,C1+-t~
My appointment expires
W W/bd
File: 2.1, 4.1
REF. FAC01-0039 (STM WAT EASE & MAINT AGRMNT E & W)\E02-493
Storm Water Easement and Maintenance Agreement - East & West
Page 4 of 10
EXHIBIT "A'
LEGAL DESCRIPTION
SHORT PLAT NO. SPL00-001 1 (east)
Parcel No. 332790-0270
That portion of the East half of the Northwest quarter of the Northeast quarter of Section
17, Township 21 North, Range 5 East, W.M., in King County, Washington, described as
follows:
Beginning at a point on the East line of the East half of the Northwest quarter of the
Northeast quarter of Section 17, Township 21 North, Range 5 East, W.M., in King County,
Washington, said point being 30 feet South of the Northeast corner thereof and the true
point of beginning;
Thence N 890 55' 24" W, 180.78', thence S 060 30' 37" W, 64.78', thence
S 420 26' 34" W, 84.76', thence S 040 25' 22" E, 293.82', thence S 890 55' 24" E, 60.00',
thence S 440 24' 57" E, 133.44', thence S 370 44' 48" W, 160.15', thence 32.18' easterly
around a curve with a radius of 50.00', thence N 370 44' 48" E, 146.02', thence S 350 10'
46" E, 102.26', thence N 01 ° 00' 02" W, 610.38' to the point of beginning.
LEGAL DESCRIPTION
Co's
SHORT PLAT NO. SPL00-0012 (west)
Parcel No. 172105-9099
That portion of the East half of the Northwest quarter of the Northeast quarter of Section
al•, 17, Township 21 North, Range 5 East, W.M., in King County, Washington, described as
%an follows:
Beginning at a point on the East line of the East half of the Northwest quarter of the
cs Northeast quarter of Section 17, Township 21 North, Range 5 East, W.M., in King County,
Washington, said point being 30 feet South of the Northeast corner thereof;
Thence N 890 55' 24" W, 180.78' to the true point of beginning;
Thence N 890 55' 24" W, 245.1 1', thence S 01a 08' 54" E, 519.92', thence S 890 55' 24" E,
195.30', thence N 01 ° 00' 02" W, 100.00', thence N 040 25' 22" W, 293.82', thence N 421
26' 34" E, 84.76', thence N 06° 30' 37" E, 64.78', to the point of beginning.
Storm Water Easement and Maintenance Agreement -East & West
Page 5 of'] 0
EXHIBIT `B'
Stormwater Pollution Prevention Plan
for
SCHROEDER SHORT PLATS
SEPA# SEP01-0006
FAC# 01-0039
CL;
C"A Site Address:
~Jn
a The project is located in NE 1 V, Section 17, Township 21. North, Range 5
C11h East, W.M., south of SE 320th St., east of 110th Ave. SE and west of 112th
Place SE., in the City of Auburn. The two on-site roads will be private
streets. There are two existing lots. The Tax Parcel Nos. are 332790-0270
and 172105-9099.
Introduction:
The project consists of two side-by-side short plats, each with four lots.
The site is currently undeveloped.
East Short Plat #SPL00-0011:
The project will create 4 single family residential lots from an existing 2.66
acre large lot. The area is zoned R 1. The property fronts on SE 320th St.
Access to the new lots will be from a new short cul-de-sac private road
that will be connected to SE 320th St. This road will include a turnaround
bulb at its terminus. The property includes existing wetlands within the
southern portion of the site. These wetlands, along with a 50' average
buffer, will not be disturbed and will be set aside within a Sensitive Areas
Easement. To serve the new lots, a sanitary sewer main will be installed
within the new road, as well as water service pipes and other utilities. The
frontage road, SE 320th St., will be improved with curb, gutter and sidewalk
as well as any necessary pavement widening. Fill be required to construct
the road, while excavation will be required for the drainage pond and
the utility trenches. There is also an open drainage ditch that along the
northwest property line.
Storm Water Easement and Maintenance Agreement - East & West
Page 6 of 10 1
West Short Plat #SPL00-0012:
The project will create 4 single family residential lots from an existing 2.36
acre large lot. The area is zoned R 1. The property fronts on SE 3201h St.
Access to the new lots will be from a new short cul-de-sac private road
that will be connected to SE 320th St. This road will include a turnaround
bulb at its terminus. The property includes an existing drainage ditch that
runs through the center of the site, flowing east to west. This drainage
course will remain within a public drainage easement. To serve the new
lots, a sanitary sewer main will be installed within the new road, as well as
water service pipes and other utilities. The frontage rood, SE 320th St., will
be improved with curb, gutter and sidewalk as well as any necessary
pavement widening. Fill be required to construct the road.
The drainage from both short plats will be piped into a common open_
detention pond. The pond will discharge into the existing drainage ditch
that runs through the property. This existing drainage ditch will be
improved with gross-lining to provide a measure of biofiltration.
Plan Goal:
The goal of the plan is to collect and treat all runoff from the onsite roads
and driveways and from the roof downspout gutters for the new houses
by means of catch basins and pipes. The runoff will be piped into an
open detention pond with grass lined sides. The sides will be graded at a
cl-i 0 3:1 slope which will maximize the surface area that the pond will have on
its volume. The existing on-site ditch currently receives drainage flows
N from the public drainage system within SE 320th St. This ditch will be re-
o constructed as a grass-lined biofiltration swole. The flows that run through
the ditch will receive a certain measure of water quality enhancement
rv
o by traveling across the grass-lined ditch section.
0
Preventative BMP's:
The catch basins shall have stenciled next to them "DUMP NO WASTE -
DRAINS TO GROUNDWATER". There are generally no direct activities
related to the residential short plat's function that would generate
hazardous spill potential. Any activity that involves pollutants such as
such as oil changes, yard fertilizing, etc. are regularly performed by
professionals hired by the homeowner. Automobile maintenance will
generally be performed off-site. The City will be responsible for inspection
Storm Water Easement and Maintenance Agreement East & West
Page 7 of 10
of the on-site biofiltration swole and the catch basins within the SE 320th St.
ROW. The private homeowners will be responsible for the detention pond
and the on-site catch basins. The public catch basins and bioswale will
be visually inspected for accumulation of debris and silts and will be
maintained as required or as dictated by the City's maintenance routine.
The private catch basins and detention will be inspected by the
homeowners on a semi-annual basis.
CI. Treatment BMP's:
C
cW
r The existing ditch being converted to a biofiltration Swale will provide a
degree of water quality treatment to the existing public drainage that
currently receives little treatment in this area. The on-site detention pond
will provide settling capability and biological treatment along the grass
covered surfaces. In addition, the flow restrictor located within the
detention pond will act as an oil/water separator. The detention pond
will also provide a measure of treatment for the runoff due to the long
residence time for the flows within the large pond.
Inspection:
The pond and private roads' drainage facilities will be inspected twice a
year by the homeowner's representative. The typical inspection dates
will be April 1 and October 31. The systems will also be checked
immediately after large storm events and during heavy wind storms.
Records of inspection will be kept for a minimum of 5 years and will be
available for review by the City Inspector. The items that will be
inspected include the flow restrictor, detention system and catch basins.
Maintenance:
To ensure proper treatment by the detention pond grass surface, it must
be properly maintained. During the summer months, the pond must be
mowed regularly, maintaining a grass length of approx. 6 inches with
proper removal of all grass clippings. Removal of any deposits or
sediments over 4" deep or covering the grass is also necessary. Remove
the sediments, re-seed and fertilize as necessary. Fertilizing must be done
sparingly and during a dry period so that the fertilizer is not carried
through to the downstream drainage system. The flow restrictor shall be
inspected twice a year as specified above. When any floating matter
exceeds 1 " in depth, it must be skimmed off the surface and properly
disposed. The sediment accumulation within the detention system and
Storm Water Easement and Maintenance Agreement - East & West
Page 8 of 10
the catch basin sumps must be checked and removed if over 4" in
depth.
Person of Responsibility:
Walt Schroeder (or current owner)
16608 SE 331 st St.
Auburn, Wa. 98092
Contact: Walt Schroeder
Phone: (253) 333-7406
City of Auburn
Public Works Dept.
Auburn, Wa. 98002
Plan Prepared By:
James Jaeger, P.E.
9419 S. 204th PI.
Kent, Wa. 98031
(253) 850-0934
The City of Auburn Utilities Section is to review and approve any changes
to this Stormwater Pollution Prevention Plan prior to changes in its
implementation. Additionally, any changes in ownership or person of
responsibility are to be reported to the City Utilities Section.
C%4 The drainage facilities within SE 3201h St. and the on-site public drainage
c ditch will be public facilities and will be maintained by the City Public
C1.3 Works maintenance staff. The inspection schedules for the public facilities
are established by the City. It is recommended that the biofiltration swale
be inspected at least twice a year, in the spring and again in the fall.
However, the City will incorporate this plat into its maintenance schedule,
which will determine the frequency of inspections.
Storm Water Easement and Maintenance Agreement - East & West
Page 9 of 10
• PRIVATE SYSTEM INSPECTION / MAINTENANCE CHECKLIST
Structure
Date of Inspection/Maintenance
CB#5
Insp.
Results
Maint. Done
CB#6
Insp.
e•„
Results
9-0,
Maint. Done
C1.4
CB#7
Insp.
n,
Results
Main t_ Done
o
CB#8
Insp.
Results
Maint. Done
CB#9
Insp.
Results
Maint. Done
CB#10
Insp.
Results
Maint. Done
CB#11
Insp.
Results
Maint. Done
CB#12
Insp.
Results
Maint. Done
CB#13
Insp.
Results
Maint. Done
Det. Pond
Insp.
Results
WW/bd
Maint. Done
File: 2.1, 4.1
REF. FACO1-0039 (STM WAT EASE & MAINT AGRMNT E & W)\E02-493
• Y
Storm Water Easement and Maintenance Agreement - East & West
Page 10 of 10