TRAFFIC IMPACT FEE CREDIT AGREEMENT
(Project No. FAC07-0015) record b~
Reference # (f applicable): N/A expmv,
r
Grantor/Borrower: Gates, Gates and Gates P&to its 01-lint Upon title.
Grantee/Assignee/Beneficiary: City of Auburn
Legal Description/STR: Lots 1 to 4 of Auburn SP-16-79
Revised Recording No. 8207130444,
Parcel A of Auburn BLA07-0008 Recording No. 20070904900010
Assessor's Tax ParcelID#: 1321049057,1321049093,1321049094,1321049095
hIi.,r.7
This Traffic Impact Fee Credit Agreement ("Agreement") is made and entered
into on this - Aay of 2010, by and between the City of Auburn,
a municipal corporation of the State of Washington, hereinafter referred to as "City", and
Gates, Gates and Gates, a Washington Partnership, hereinafter referred to as "Gates."
The City and Gates are hereinafter referred to as the "Parties."
WITNESSETH:
WHEREAS, Gates is the owner of certain real properties legally described as Lots 1
through 4 of Auburn Short Plat SP-16-79 Revised Recording No. 8207130444 (Lots 1 to 4)
and Parcel A of Auburn BLA-07-0008 Recording No. 20070904900010 (parcel A) as
depicted in Exhibit A of this agreement ("Gates Properties"); and,
WHEREAS, the City has included in its Six Year Transportation Improvement
Program (2007-2012) two Road Capacity Projects identified as follows:
TIP #2 "A" Street NW, Phase 1 (3rd Street NW to 14th Street NW) and
TIP #9 "A" Street NW, Phase 2 (West Main to 3rd Street NW). These two projects
establish a future public roadway hereinafter referred to as "A Street NW." That portion of
"A" Street NW between approximately 5th Street NW and 8th Street NW is proposed to be
located along and within the Gates Properties as depicted in Exhibit B of this Agreement;
and,
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 1 of 10
WHEREAS, pursuant to City of Auburn Resolution No. 4196, the Parties entered
into an Agreement for City/Developer Participation for Compensation of A Street Northwest
and Settlement of Disputed Claim ("A" Street Agreement); and,
WHEREAS, Section 2.2 of the "A" Street Agreement states that: "to document the
additional cost to the Developer for the change from asphalt concrete to cement concrete,
the Developer shall provide to the City verifiable construction bids for both surfacing
options. The cost difference shall be agreed upon by both Parties and identified as the
"Cement Concrete Roadway Adjustment;" and,
WHEREAS, Gates provided a cost difference from the same contractor between
paving with asphalt concrete and cement concrete for the roadway portion from 5m Street
NW to 7m Street NW as depicted in Exhibit C of this Agreement; and,
WHEREAS, the City has determined that the cost of paving with cement concrete
was evaluated to be $50,350 more than the cost of paving the same roadway with asphalt
concrete; and,
WHEREAS, rather than compensate Gates for the Roadway Development
measures beyond those required by City codes and standards entirely by monetary
payment, the City is willing to compensate Gates for the Roadway Development of the "A"
Street NW right-of-way by granting to Gates Transportation Impact Fee Credits ("TIF
Credits") that can be applied pursuant to Auburn City Code (ACC) 19.04.060; and,
NOW THEREFORE, in consideration of the terms and conditions of this Agreement,
the sufficiency of which is hereby acknowledged, the Parties agree and bind themselves
and their respective legal representatives, successor, and assigns, as follows:
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 2 of 10
AGREEMENT
1. Roadway Development
Gates has provided Roadway Development within the A Street NW right-of-way (the
"A Street NW ROW") as required and specified in the "A" Street Agreement.
2. Consideration Provided to Gates for Roadway Development
The City agrees to compensate Gates for the Roadway Development of
"A" Street NW by granting to Gates Transportation Impact Fee (TIF) Credits in an
amount calculated as follows. The value of the implemented Roadway
Development measures less the value of the measures required by City codes
and standards. This is represented by the following formula:
TIF Credits = (Estimate Conc paving) - (Estimate Asphalt paving)
_ ($119,290 + $3,295) - ($72,235) _ $50,350
The TIF Credits may be used by Gates pursuant to Auburn City Code (ACC)
19.04.060 to offset Transportation Impact Fees that may be required for any
development upon the Gates Properties. The Transportation Impact Fee Rate
Schedule utilized for determining Transportation Impact Fees shall be the Rate
Schedule in force at the time this Agreement is executed.
3. General Terms
3.1. Each of the Parties shall protect, defend, indemnify and save harmless the other
party from and against all liabilities, penalties, costs, losses, damages, expenses,
causes of action, claims, demands, or judgments, including without limitation,
reasonable attorney's fees, arising out of or related to the terms, covenants or
conditions of this Agreement and such parties' performance or failure to perform
any aspect of this Agreement; provided, however, that if the claims or suits are
caused by or result from the concurrent negligence of (a) the City, its agents or
employees, and (b) Gates, its agents or employees, including those actions
covered by RCW 4.24.115, the obligations shall be valid and enforceable only to
the extent of the indemnifying parties' negligence, and provided further, that
nothing herein shall require either party to hold harmless or defend the other party
from any claim arising from the sole negligence of the other party.
3.2. In the event that any party deems it necessary to institute legal action or
proceedings to enforce any right or obligation under this Agreement, the action or
proceeding shall be brought in the Superior Court for King County, Washington.
The prevailing party shall be entitled to an award of its costs and reasonable
attorneys' fees.
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 3 of 10
3.3. Each person signing below represents and warrants that execution of this
Agreement has been duly authorized and that no further action on the part of the
any party is necessary to make this Agreement binding in accordance with its
terms.
3.4. This Agreement shall inure to the benefit of and be binding upon the successors
and assigns to the parties hereto.
3.5. Any demand, request or notice which either party hereto desires or may be
required to make or deliver to the other shall be in writing and shall be deemed
given when delivered by facsimile, personally delivered, delivered by private
courier service (such as Federal Express), or three days after being deposited in
the United States Mail in registered or certified form, return receipt requested,
addressed as follows:
To Gates:
William Gates
Mohawk Northern Plastics, Inc.
701 A Street NE
Auburn, WA 98002
To City of Auburn:
Dennis Dowdy, PE
Public Works Director
City of Auburn
25 West Main Street
Auburn, WA 98001-4998
Facsimile No (253) 931-3053
IN WITNESS WHEREOF, the parties hereto have executed this agreement on the date
and year first above set forth.
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 4 of 10
CITY OF AUBURN
a Was ' nicipal corporation
J
By
Peter B. Lewis, Mayor
ATTEST:
Daz~
' Ile E. Daskam, City Clerk
By
GATES, GATES AND GATES
Authorized Agent
/'v; <4r'
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 5 of 10
STATE OF WASHINGTON
COUNTY OF KING
) ss
I certify that I know or have satisfactory evidence that Peter B. Lewis and
Danielle E. Daskam were the persons who appeared before me, and said persons
acknowledged that they signed this instrument, on oath stated that they were authorized to
execute the instrument and acknowledged it as the MAYOR and CITY CLERK of the CITY
OF AUBURN to be the free and voluntary act of such parties for the uses and purposes
mentioned in this instrument.
GIVEN under my hand and official seal this
Q°
day of 2010.
/t -A7- r~
iG(hi
Residing at _
My appointment
~I
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 6 of 10
STATE OF WASHINGTON
COUNTY OF KING
j ss
I certify that I know or have satisfactory evidence that W j I) i a1n k- is
the person who appeared before me, and s/he acknowledged that he signed this
instrument, on oath stated that he was authorized to execute the instrument and
acknowledged it as the 62.na rc I @j n-¢ v of Ga Ars.16"s`g,r d G"s , a
Washington Partnership, to be the free and voluntary act of such Partnership for the
uses and purposes mentioned in the instrument.
GIVEN under my hand and official seal this C~ day of Q 2010.
W~ich.e.ll.c~ G , ~Y~1d, na v
Residing at 1-Ln,-m-t H Ave C a I WA
My appointment expires 'T 7Lt
Exhibits:
Exhibit A Gates Properties Location
Exhibit B Roadway Development Location
Exhibit C Poe Construction Cost Comparison for A Street Extension Options
HSftlb
File: #1168, #1292
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 7 of 10
EXHIBIT A
Gates Properties Location
. '12'11049027
BTH•5T NE~-°
sas3a9oes2s
I 1321049057 80534000
132104900b I ( O T j 63d006tB
I40
LOT ~ a 8053400510
i
I
1 I
II rr
4 1%
1321049093
X34.
(COT 3) 1 L,Or Z f
rr
1321049004
PARCEL, A
1321049037
m
83400405 z o
o n
z
LIU
STHSTNW- I SIMSTNE
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 8 of 10
EXHIBIT B
Roadway Development Location
1321049096
S
1321040004
1321049037
i
Y
d
N
a
i
I
Traffic Impact Fee Credit Agreement
Gates, Gates and Gates
Page 9 of 10
12210490M
B06M0406
1321010061
1321049093
S
m
1221MM7
0
M°
1 6X
STH~ST N W-----...
0063400625
8053700620
0053100515
0063400610
6053400495
/t
I
tss ' eas3eooaas
4+)b
para. 003
91N
EXHIBIT C
POE CONSTRUCTION
-kid 2 if
PROJECT : A STREET EXTENSION
LOCATION: AUBURN CITY CAF: AUBURN
ARCH: RUPERT
PUBLIC FOY'onKS• D
EPT
GATE: BN/2008 V
ITEM
SUB/
ESTIMATE
ESTIMATE
COMMENTS
SUPPLIER
CONC
ASPHALT
GENERAL CONDITIONS
EST
6,390
6,390
SUPERVISION
EST
11,750
11,750
SITE WORK:
SURVEYING
DUNCANSON
4,850
4,850
AS-BUILT SURVEY
DUNCANSON
2,000
2,000
DEMOUI ION
EST
1,500
1,600
CLUN Ur novIH END O~UIU11NOftMD
EARTHWORK:
ARCHER
112,340
112,340
EROSION CONTROL
W/ARCHER
0
0
ROUGH GRADING
W/ARCHER
0
0
DISP. OF UNSUITABLE
ARCHER
25,025
25,025
FINISH GRADING
EST
2,500
2,500
LANDSCAPE FILL
UTILITIES:
UTILITY CO TRENCHIBACKFILL
STORM DRAINAGE
W/ARCHER
0
0
SANITARY SEWERS
NONE
0
0
WATER MAINS & HYDR
WIARCHER
0
0
SELECT TRENCH BACKFILL
EST
5,000
5,000
ASPHALT PAVING
LAKERIDGE
3,295
172.235-
TRANSITIONS ONLY
CONCRETE DRIVEWAY APPROACH
CALIBER
4,998
-4,998
CONCRETE PAVING
CALIBER
'1719,280
, 0
DOWELS
WICALISER
- - 0
0
RESTECL
W/CALIBER
0
0
STRIPING
POURED CURB & GUI 1 ER
CALIBER
8,883
8,883
SIDEWALKS
CALIBER
18,500
18.500
TRAFFIC BARACADE
FENCING
ALL PRO
7,450
7,450
LANDSCAPINGIIRRIGATION
PLUG
20,000
20,000
METAL TREE GRATES
4,000
4,000
INSTALL GRATES
EST
1,123
1,123
STREET LIGHTS
PLUG
40,000
40,000
DUCT BANK
SUB TOTAL
496,894
348,544
A & E FEES
BY OWNER
0
0
BLDG PERMIT FEES
BY OWNER
0
0
CITY INSPECTION FEES
NIC
0
0
LANDSCAPE BOND
NIC
0
0
UTILITY BONDS & PERMITS
BY OWNER
0
0
WATER & SEWER DEVELOPMENT FEES
NIC
0
0
POWER CO CHARGES
BY OWNER
0
0
PHONE CO CHARGES
BY OWNER
0
0
GAS CO CHARGES
BY OWNER
0
0
SOILS TESTING
BY OWNER
0
0
TESTING LAB & INSPECTION FEES
ALLOW
5,000
5,000
SLOBS RISK INS.
0.40%
1,596
1,394
GEN INS. - 0.5
1.994
1 743
SUB TOTAL
407,464
358,881
B & O TAX - 0.5%
2,037
1,783
OVERHEAD&'PROFIT
7.50%
30601
26751
TOTAL
440083
385,215
+WSST
Traffic Impact Fee Credit Agreement FAC07-0015
Gates, Gates and Gates
Page 10 of 10