Loading...
HomeMy WebLinkAboutCP1224_Geo_Report.pdf GEOTECHNICAL ENGINEERING REPORT 2013 Local Street Pavement Reconstruction Project Auburn, Washington Prepared for: Jacobs Engineering Group, Inc. 600 108th Avenue N.E., Ste 700 Bellevue, WA 98040 Prepared by: AMEC Environment & Infrastructure, Inc. 11810 North Creek Parkway North Bothell, Washington 98011 May 16, 2013 Project No. 3-917-17569-0 Printed on recycled paper AMEC Project No. 3-917-17569-0 Printed on recycled paper i \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx TABLE OF CONTENTS 1.0 SUMMARY ................................................................................................................................. 1 2.0 SITE AND PROJECT DESCRIPTION ........................................................................................ 2 3.0 EXPLORATORY METHODS ...................................................................................................... 3 4.0 SITE CONDITIONS .................................................................................................................... 4 4.1 SURFACE CONDITIONS ...................................................................................................... 5 4.2 PAVEMENT CONDITIONS ................................................................................................... 5 4.3 SOIL CONDITIONS ............................................................................................................. 6 4.4 GROUNDWATER CONDITIONS ............................................................................................ 9 5.0 CONCLUSIONS AND RECOMMENDATIONS ........................................................................ 10 5.1 SITE PREPARATION ........................................................................................................ 10 5.2 UNDERGROUND UTILITIES ............................................................................................... 11 5.3 STRUCTURAL FILL .......................................................................................................... 12 5.4 ASPHALT PAVEMENTS ..................................................................................................... 13 6.0 RECOMMENDED ADDITIONAL SERVICES ........................................................................... 16 7.0 CLOSURE ................................................................................................................................ 17 TABLES Table 1 Approximate Locations, Elevations, and Depths of Explorations ................................... 4 Table 2 Approximate Pavement Thicknesses and Subgrade ...................................................... 6 Table 3 Laboratory Test Results .................................................................................................. 9 FIGURES Figure 1 Location Map Figure 2A Site and Exploration Plan: H Street NE, 4th Street NE to Station 18+29 Figure 2B Site and Exploration Plan: H Street NE, Station 18+29 to 8th Street NE Figure 3 Site and Exploration Plan: 5th Street NE, H Street NE to Station 35+55 Figure 4A Site and Exploration Plan: 23rd Street SE, M Street SE to STA 47+69 Figure 4B Site and Exploration Plan: 23rd Street SE, STA 47+69 to R Street SE Figure 5 Site and Exploration Plan: Park Avenue, Auburn Way N to Station 74+50 APPENDIC ES Appendix A Field Exploration Procedures and Logs Appendix B Laboratory Testing Procedures and Results AMEC Project No. 3-917-17569-0 Printed on recycled paper 1 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx GEOTECHNICAL ENGINEERING REPORT 2013 Local Street Pavement Reconstruction Auburn, Washington 1.0 SUMMARY The following summary of project geotechnical considerations is presented for introductory purposes and should be used only in conjunction with the full text of this report. Project Description: The project calls for improving: H Street NE from 4th Street NE to 8th Street NE; 5th Street NE from H Street NE most of the way to the cul-de-sac; 23rd Street SE from M Street SE to R Street SE; and Park Avenue from Auburn Way N to the Veterans Memorial Park. Plans call for replacement of the existing pavement, improvements and additions to underground utilities, and improvement of pedestrian amenities at certain locations. Exploratory Methods: We explored subsurface conditions by means of 13 borings advanced at strategic locations along the roads, to depths ranging from 6.5 to 26.5 feet below existing grades. Selected samples from the explorations were submitted for laboratory testing to determine the index properties of the subsurface soils. Composite samples of the drill cuttings were collected for Californian Bearing Ratio (CBR) tests to evaluate the pavement subgrade soils. Soil Conditions: According to published geologic maps, soil conditions in the site vicinity are characterized by Holocene alluvium, consisting of silt, sand, and some gravel. These soils are deposited by an old meandering river channel with interbedded overbank and channel deposits. Our on-site explorations revealed relatively uniform soil conditions and confirmed the mapped stratigraphy at each site location. In general, all of our explorations encountered loose silts and sands, overlying lenses of gravel in some locations. Fill soils consisting of loose silty sand with some gravel with debris (glass, metal, brick, etc.) and scattered organics were encountered to depths of 4 feet in some of the borings drilled in 23nd Street SE. 23rd Street SE Subgrade: Uncontrolled fill was encountered on 23nd Street SE in borings B-10 and B-11. Additionally, uncontrolled fill with abundant debris was encountered during reconstruction of 22nd Ave SE in 2012 (just one block away). If significant amounts of fill with deleterious materials are encountered during construction, they may need to be over-excavated and replaced with structural fill, in order to reduce the risk of future settlement. Groundwater Conditions: At the time of drilling (March 28 and May 8, 2013), three of our explorations on H Street, B-5, B-7 and B-13, encountered groundwater at 9 feet in depth (elevation 66 feet). Boring AMEC 2 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx B-6 was also on H Street and probably would have encountered groundwater if it was drilled as deep as B-5, B-7 and B-13. In order to provide some information for dewatering, a groundwater observation well was installed in borehole B-13, and groundwater was measured to be 9.23 feet below the top of monument (approximately elevation 66 feet). A hand pump, pumping at a rate of 8 to 10 gallons per minute for several minutes was unable to draw the groundwater table down. Utility Trenches: Dewatering will probably be needed for the storm drain excavation between 5th Street and 8th Street. Groundwater was encountered at elevation 66 feet in this area. Temporary excavations should either be shored or sloped in accordance with Safety Standards for Construction Work, Part N, WAC 296-155-650 through 66411. For planning purposes, we interpret the on-site soils to conform with the WAC Soil Type C, which corresponds to a maximum slope of 1.5 H:1V. Most of the utility trenches can be backfilled according to the City of Auburn (City) standard detail. It should be noted that some utility trenches may encounter loose soils at the base of the trench, in which case the trench should be over-excavated 12 inches and backfilled, as described in the City Standard Detail. Pavement Conditions: The existing roadway surfaces for the project site consist of asphalt pavement over gravel base course. AMEC Environment & Infrastructure, Inc.’s (AMEC), previous pavement condition index (PCI) survey rated H Street NE as failed, 5th Street NE as poor, and Park Avenue as poor. 23rd Street SE was not part of AMEC’s previous survey, but appears to be in poor to failed condition. Table 2 summarizes our approximate pavement thickness measurements and subgrade soil observations recorded at each exploration location. Pavement Section: For H Street NE, 5th Street NE, and Park Avenue, the City standard pavement section for local residential streets with good soils can be used, and for 23rd Street SE the standard pavement section for local residential streets with medium soils can be used. These sections consist of a minimum of: 2 inches hot mix asphalt (HMA) Class B Modified, over 2 inches HMA Class E, over 6 inches or 8 inches, respectively, of crushed surfacing base course. We recommend placing a geotextile separator between the silty subgrade soils and the crushed surfacing base course. 2.0 SITE AND PROJECT DESCRIPTION This Geotechnical Engineering Report is for improvements of four residential roads located within the City limits of Auburn, Washington, as shown on the enclosed Location Map (Figure 1). In general the improvements include replacing almost all of the pavement, and replacing some City utilities. H Street NE – 4th Street NE to 8th Street NE: The existing pavement and base course will be removed and replaced; curbs, gutters, and sidewalks will be repaired where necessary; the water main will be replaced with a larger pipe, a segment of the sewer pipe will be replaced; and a new storm drainage pipe will be constructed. AMEC Project No. 3-917-17569-0 Printed on recycled paper 3 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx 5th Street – H Street NE to Cul-de-Sac: The western portion of pavement and base course will be removed and replaced. The area of severe settlement will be regraded. Curb, gutter, sidewalk, and driveway aprons will be repaired where necessary. A new storm drainage pipe will be constructed. 23rd Street SE – M Street SE to R Street SE: The existing pavement and base course will be removed and replaced (except for a section of newer pavement near R Street); curbs, gutters, and sidewalks will be repaired where necessary; the water main will be replaced with a larger pipe; and a new storm drainage pipe will be constructed. Park Avenue – Auburn Way to Veterans Memorial Park: The existing pavement and base course will be removed and replaced; curbs, gutters, and sidewalks will be repaired where necessary; and a new storm drainage pipe will be constructed. The conclusions and recommendations contained in this report are based on the understanding of the proposed use of the project site by AMEC, as derived from layout drawings, written information, and verbal information supplied to us. Consequently, if any changes are made to the currently proposed project, we may need to modify our conclusions and recommendations contained herein to reflect those changes. 3.0 EXPLORATORY METHODS AMEC explored surface and subsurface conditions at the project site on March 28 and May 8, 2013. Our exploration and testing program is comprised of the following elements:  A visual surface reconnaissance of the site;  Thirteen borings (designated B-1 through B-13), advanced at strategic locations;  One groundwater observation well installed in borehole B-13 for the new storm drain line to be installed on H Street NE;  Fifteen moisture content determinations, performed on selected soil samples;  Ten grain-size analyses, one organic content determination, and two CBRs, performed on selected soil samples; and  A review of published geologic and seismologic maps and literature. Table 1 summarizes the approximate locations, surface elevations, and termination depths of our subsurface explorations and Figures 2A, 2B, 3, 4A, 4B, and 5 depict their approximate locations. AMEC 4 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx The specific number, locations, and depths of our explorations were selected by AMEC and field - adjusted in relation to the existing and proposed site features, under the constraints of surface access, underground utility locations, and budget considerations. We estimated the relative location of each exploration by measuring from existing features and scaling these measurements onto a layout plan supplied to us, then we estimated their elevations by interpolating between contour lines shown on this same plan. Consequently, the data listed in Table 1 and the locations depicted on Figures 2A, 2B, 3, 4A, 4B, and 5 should be considered accurate only to the degree permitted by our data sources and implied by our measuring methods. Table 1 Approximate Locations, Elevations, and Depths of Explorations Exploration Location Surface Elevation (feet) Termination Depth (feet) B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 Park Avenue, Station 71+63, 5’ R Park Avenue, Station 74+47, 22’ L Park Avenue, Station 62+58, 2’ L 5th Street NE, Station 31+65, 6’ L 5th Street NE, Station 30+32, 6’ L H Street NE, Station 24+47, 6’ L H Street NE, Station 21+38, 5’ L H Street NE, Station 11+90, 5’ R 23nd Street SE, Station 41+26, 4’ R 23nd Street SE, Station 43+85, 5’ R 23nd Street SE, Station 45+70, 4’ R 23nd Street SE, Station 48+93, 5’ R H Street NE, Station 22+59 & 13’ L 78.0 77.5 76.5 74.5 74.5 74.5 75.0 76.5 124.5 126.0 127.5 129.0 75.0 9.0 9.0 9.0 9.0 11.5 9.0 11.5 9.0 7.5 9.0 6.5 9.0 26.5 Elevation datum: Site plans provided by Jacobs Engineering It should be noted that the explorations performed and used for this report reveal subsurface conditions only at discrete locations along the project alignment and that actual conditions in other locations could vary. Furthermore, the nature and extent of these variations would not become evident until additional explorations are performed or until construction activities have begun. If significant variations are observed at that time, we may need to modify our conclusions and recommendations contained in this report to reflect the actual site conditions. 4.0 SITE CONDITIONS The following sections of text present our observations, measurements, and interpretations regarding utility, traffic, surface, pavement, soil, and groundwater conditions at the project site. AMEC Project No. 3-917-17569-0 Printed on recycled paper 5 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx 4.1 Surface Conditions Regional grades in the site vicinity reflect the generally level floodplain valley of the White and Stuck Rivers. The roadways planned for reconstruction are flat to gently sloping with 23th Street SE having the largest elevation change of approximately 4.5 feet from the west end at M Street SE to eastern end at R Street SE. All the roadways are located in residential areas with single family homes residing on both sides of the road. Concrete curbs and sidewalks are on both sides of H Street NE, 23rd Street SE, and Park Avenue. There are concrete curbs on both sides of 5th Street NE, but there was a sidewalk only on the north side of the street. Significant differential settlements were observed on the surface of the roadways at the following locations: H Street NE: Between Stations 11+75 to 13+50 in the south bound lanes; between Stations 16+50 to 17+00 where the pavement is distressed at the intersection with 5th Street NE; between Stations 20+50 and 22+00 in the north bound lane; and between Stations 24+00 to 25+00 where the pavement section is thin, totally distressed, and has no base course in places. 5th Street NE: Between Stations 31+25 to 31+75 the roadway has experienced significant settlement across the entire roadway, and the pavement section is thin and has no base course in places. 23rd Street SE: Between Stations 41+00 to 42+80; between Stations 43+50 to 47+00 this area is underlain by fill soils causing an undulating roadway and distressed pavement; and between Stations 49+00 to 51+00. Park Avenue: Between Stations 71+00 to 72+00 in the east bound lane, and between Stations 62+00 and 63+00 in the west bound lanes. Both areas had depressions where surface water ponds impacting the roadway subgrade, leading to settlement and alligatoring of the pavemen t section. 4.2 Pavement Conditions The existing roadway surfaces for the project site consist of asphalt pavement over gravel base course. AMEC’s previous PCI survey rated H Street NE as failed, 5th Street NE as poor, and Park Avenue as poor. 23rd Street SE was not part of AMEC’s previous survey, but appears to be in poor to failed condition. Table 2 summarizes our approximate pavement thickness measurements and subgrade soil observations recorded at each exploration location. AMEC 6 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Table 2 Approximate Pavement Thicknesses and Subgrade Exploration Station Asphalt Pavement (inches) Base Course (inches) Subgrade Soil Type B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 71+63 74+47 62+58 31+65 30+32 24+47 21+38 11+90 41+26 43+85 45+70 48+93 22+59 5.0 2.5 4.0 2.5 2.0 1.0 1.5 1.5 2.5 2.5 2.5 2.5 1.5 13.0 12.0 26.0 15.5 7.0 — 2.0 16.5 6.0 6.0 2.5 5.0 10.5 silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND silty fine SAND (Fill) silty fine SAND (Fill) silty fine SAND silty fine SAND Notes: — = Not Observed. 4.3 Soil Conditions According to published geologic maps, soil conditions in the site vicinity are characterized by Holocene alluvium, consisting of gravels, sands, and silts. Our on-site explorations revealed soil conditions that confirmed the mapped stratigraphy, and the subsurface conditions encountered by our explorations are discussed by the street sections investigated. The soils underlying the area of H Street NE indicate that the road subgrade is underlain by an old meandering river channel with interbedded overbank and channel deposits. Explorations on H Street NE, boreholes B-5 through B-8 and B-13, encountered 1 inch to 18 inches of pavement and base course mantling alluvial soils. Boring B-5 encountered loose alluvial silty sand from 0.75 feet to a depth of 4 feet below the ground surface. At 4 feet, our borehole encountered medium dense to dense alluvial sandy gravels to a depth of 6.5 feet below the ground surface. The alluvial gravels are underlain by alluvial volcanic sands to a depth of 9 feet below the ground surface. Beneath these volcanic sands were 2.5 feet of medium dense alluvial sandy gravels to the full depth of our exploration of 11.5 feet. Borehole B-6 encountered very loose alluvial silty sand from 1 inch below the top of pavement to a depth of 4.5 feet below the ground surface. At 4.5 feet our borehole encountered very loose alluvial volcanic sands to a depth of 7.5 feet where the sands became loose to the full depth of our exploration of 9 feet. Boring B-7 encountered very loose alluvial silty sand from 0.75 feet to a depth of 4.5 feet below the ground surface. At 4.5 feet our borehole encountered loose alluvial volcanic sands to the full depth of our exploration of 11.5 feet. Boring B-8 encountered very loose alluvial silty sand from 1.5 feet to a depth of 7 feet below the ground surface. At 7 feet our borehole encountered medium dense alluvial volcanic sands to a depth of 8.5 feet below the ground surface. AMEC Project No. 3-917-17569-0 Printed on recycled paper 7 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Beneath these volcanic sands was 0.5 foot of medium dense alluvial sandy gravel to the full depth of our exploration of 9 feet. Boring B-13 encountered very loose, alluvial, silty sand from 1 foot to 5 feet below the ground surface. At 5 feet, the boring encountered medium dense, alluvial, sandy gravel to a depth of 19.5 feet below the ground surface. The soils were underlain by medium dense sand with some silt to a depth of 21 feet below the ground surface. Beneath these soils were medium dense volcanic sands to the full depth of our exploration of 26.5 feet. At the intersection with 5th Street NE south to 4th Street NE, alluvial sandy gravel deposits underlie the alignment from 4 to 8.5 feet below existing grades. The soils underlying the area of 5th Street NE indicate that the road subgrade is underlain by an old meandering river channel with interbedded overbank and channel deposits. Explorations on 5th Street NE, boreholes B-4 and B-5, encountered 0.75 to 18 inches of pavement and base course mantling alluvial soils. Boring B-4 encountered loose alluvial silty sand from 0.75 feet to a depth of 4.5 feet below the ground surface. At 4.5 feet our borehole encountered loose alluvial volcanic sands to the full depth of our exploration of 9 feet. Boring B-5 encountered loose alluvial silty sand from 0.75 feet to a depth of 4 feet below the ground surface. At 4 feet, our borehole encountered medium dense alluvial sandy gravels to a depth of 6.5 feet below the ground surface. The alluvial gravels are underlain by alluvial volcanic sands to a depth of 9 feet below the ground surface. Beneath these alluvial volcanic sands were 2.5 feet of medium dense alluvial sandy gravels to the full depth of our exploration of 11.5 feet. The soils underlying the area of 23rd Street SE indicate that the western half of the road subgrade is underlain by fill soils and overlies alluvial soils of an old meandering river channel with interbedded overbank and channel deposits. The western two-thirds of the alignment is underlain by sandy gravel deposits ranging from 4 to 6.25 feet below the ground surface. These sandy gravels were not encountered at depth in the eastern one-third of the alignment. Explorations on 23rd Street SE, boreholes B-9 through B-12, encountered 0.5 to 0.75 feet of pavement and base course mantling fill and alluvial soils. Boring B-9 encountered loose silty sand from 0.75 feet to a depth of 4 feet below the ground surface. At 4 feet, our borehole encountered dense alluvial sandy gravels to the full depth of our exploration of 7.5 feet. Boring B-10 encountered fill soils consisting of loose silty sand with some gravel with debris (glass, metal, brick, etc.) and scattered organics from 0.75 feet to a depth of 4.5 feet below the ground surface. The fill soils were underlain by loose alluvial silty sand with lenses of sandy silt and scattered organics from 4.5 feet to a depth of 6.25 feet below the ground surface. Beneath these silty and sandy soils were 2.75 feet of dense alluvial sandy gravels to the full depth of our exploration of 9 feet. Boring B-11 encountered fill soils consisting of loose silty sand with some gravel with debris (glass, metal, brick, etc.) and scattered organics from 0.5 feet to a depth of 4 feet below the ground surface. The fill soils are underlain by loose alluvial volcanic sands to a depth of 5 feet below the ground surface. Beneath these alluvial volcanic sands we encountered 1.5 feet of AMEC 8 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx dense alluvial sandy gravels to the full depth of our exploration of 6.5 feet. Borehole B-12 encountered very loose alluvial silty sand from 0.5 foot below the top of pavement to a depth of 3.5 feet below the ground surface. At 3.5 feet our borehole loose alluvial volcanic sands to the full depth of our exploration of 9 feet. The soils underlying the area of Park Avenue indicate that the road subgrade is underlain by an old meandering river channel with interbedded overbank and channel deposits. Explorations on Park Avenue, boreholes B-1 through B-3, encountered 1 to 30 inches of pavement section and base course mantling alluvial soils. Boring B-1 encountered very loose alluvial silty sand with lenses of sandy silt and scattered organics below 1.5 feet for the entire depth of our borehole. Borehole B-2 encountered very loose alluvial sand from 1.25 feet to a depth of 4 feet below the ground surface. At 4 feet our borehole encountered very loose alluvial volcanic sands to a depth of 7.5 feet where the sands became dense to the full depth of our exploration of 9 feet. Boring B-3 encountered very loose alluvial silty sand from 2.5 feet to a depth of 4.5 feet below the ground surface. At 4.5 feet our borehole encountered very loose alluvial volcanic sands to a depth of 7 feet. Beneath the volcanic sands, our boring encountered loose alluvial silty sands interbedded with medium stiff sandy silt to the full depth of our exploration of 9 feet. The exploration logs (enclosed in Appendix A) provide a detailed description of the soil strata encountered in our subsurface explorations. AMEC did not run any geotechnical laboratory tests on the fill soils encountered on 23rd Street SE. Based on our visual observations, these fill soils have a variable fines (silt and clay) content and moisture content. We interpret the majority of the fill soils to be above their optimum moisture content, and to be highly sensitive to moisture content variations. Our geotechnical laboratory tests indicate that the alluvial deposits of silty sand and sandy silt encountered have a fines content on the order of 16 to 30 percent, and a moisture content on the order of 9 to 47 percent. The alluvial deposits of sand have a fines content on the order of 2 to 8 percent, and a moisture content on the order of 4 to 15 percent. The alluvial sandy gravel tested had a fines content of 3 to 4 percent and moisture content of 8 to 13 percent. The laboratory testing sheets (enclosed in Appendix B) graphically present our test results, and Table 3 summarizes these results. AMEC Project No. 3-917-17569-0 Printed on recycled paper 9 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Table 3 Laboratory Test Results Source Soil Type Sample Depth (feet) Moisture Content (percent) Gravel Content (percent) Sand Content (percent) Silt/Clay Content (percent) B-1, S-1 Alluvium, SM 2.5 – 4.0 18 N/T N/T N/T B-1, S-2 Alluvium, SM 5.0 – 6.5 47 N/T N/T N/T B-2, S-1 Alluvium, SM 2.5 – 4.0 23 N/T N/T N/T B-2, S-2 Alluvium, SM 5.0 – 6.5 15 3 93 4 B-4, S-2 Alluvium, SM 2.5 – 4.0 4 10 88 2 B-5, S-4 Alluvium, GP 10.0 – 11.5 8 67 23 3 B-6, S-2 Alluvium, SM 5.0 – 6.5 8 1 91 8 B-7, S-1 Alluvium, SM 2.5 – 4.0 30 N/T N/T N/T B-10, S-1 Alluvium, SM 2.5 – 4.0 23 9 64 27 B-11, S-1 Alluvium, SM 2.5 – 4.0 23 N/T N/T N/T B-12, S-2 Composite Alluvium, SM 5.0 – 6.5 13 0 84 16 B-7 & B-8 Composite Alluvium, SM 1.0 – 4.0 9 12 55 33 B-9 & B-12 B-13, S-5 B-13, S-7 Alluvium, SM Alluvium, GP-GM Alluvium, GP-GM 1.0 – 4.0 12.5-14.0 17.5-19.0 10 11 13 8 55 47 69 41 49 23 4 4 Notes: N/T = not tested 4.4 Groundwater Conditions At the time of drilling (March 28 and May 8, 2013), three of the explorations drilled on H Street NE: B-5, B-7 and B-13; encountered groundwater 9 feet below the ground surface (elevation 66 feet). Boring B-6 was also on H Street and probably would have encountered groundwater if it was drilled as deep as B-5, B-7 and B-13. In order to provide some information for dewatering, a 2-inch diameter groundwater observation well was installed in borehole B-13, and the static groundwater table was measured to be 9.23 feet below the top of monument (approximately elevation 66 feet) on May 14, 2013. The remaining boreholes did not encounter groundwater within their termination depths. Groundwater levels tend to fluctuate in response to precipitation patterns and may also respond to construction activities. Because our explorations were performed during the spring season, the groundwater conditions may represent the yearly high levels. We attempted to conduct a slug test to evaluate the groundwater hydraulic conductivity of the aquifer underlying H Street NE, but were unsuccessful in attaining reliable information with our 2-inch- diameter monitoring well. Initial efforts consisted of dropping a 5-foot slug into the well to measure the falling head of the displaced water. During the time it took to release the slug and commence water level readings, the water level reading had already returned to the elevation of the static water level. AMEC 10 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx We then lowered the tip of a hand pump into the monitoring well approximately 4.4 feet below the static water level and began pumping. Multiple readings were taken to determine a pumping rate, and it averaged between 8 to 10 gallons per minute. We then continuously pumped for several minutes and were unable to draw the water table down to the tip of the hand pump. During these times, we also tried remove the hand pump from the well and take a water level reading (this process took about 1 minute). Each time, the water level had already returned to the static water level. Therefore, we can only assume that the well can be pumped at more than 10 gallons per minute, without significant drawdown. 5.0 CONCLUSIONS AND RECOMMENDATIONS The project proposes replacing the pavement and some utilities on H Street NE, 5th Street NE, and 23rd Street SE, and replacing the pavement on Park Avenue. Dewatering for installation of the storm drain line on H Street NE will be probably be needed. The following sections of this report present our specific geotechnical conclusions and recommendations concerning site preparation, underground utilities, structural fill, and asphalt pavements. American Society for Testing and Materials (ASTM) specification codes cited herein refer to the current ASTM manual. Washington State Department of Transportation (WSDOT) specification codes cited herein refer to the current WSDOT publication M41-10, Standard Specifications for Road, Bridge, and Municipal Construction. 5.1 Site Preparation Preparation of the project site will most likely involve controlling surface water runoff and erosion, removal of the existing pavement, abandonment of old utility pipes, minor grading, and subgrade preparation Temporary Drainage: We recommend intercepting and diverting any potential sources of surface or near-surface water within the construction zones before stripping and demolition begins. Because the selection of an appropriate drainage system will depend on the water quantity, season, weather conditions, construction sequence, and the methods of the contractor, final decisions regarding drainage systems are best made in the field at the time of construction. Nonetheless, we anticipate curbs, berms, silt fences, or ditches placed around the work areas will adequately intercept surface water runoff. Erosion Control Measures: Because stripped surfaces and soil stockpiles are typically a source of runoff sediments, they should be given particular attention. If earthwork occurs during wet weather, we recommend all soil stockpiles and cut slopes be covered with plastic sheeting for erosion protection. In addition, exposed surfaces should not be left unprotected for long periods of time since subgrades tend to deteriorate when exposed to wet weather. AMEC Project No. 3-917-17569-0 Printed on recycled paper 11 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Demolition: Demolition along the project alignment will mainly consist of removing the existing pavement materials and possibly some existing utilities. The existing pavement section along most of the streets consists of asphalt concrete overlying base course gravel and subgrade soils. Other materials to be demolished and removed may include gravel base and abandoned utilities. Concrete pavement could possibly be encountered in areas outside of our exploration locations , since some nearby streets are paved with concrete. Subgrade Compaction: Exposed subgrades for pavements and other structures should be compacted with a large vibratory roller to a dense, unyielding state. Any localized zones of loose granular soils observed within a subgrade should be compacted. In co ntrast, any uncontrolled fill, organic, soft, wet, and pumping soils observed within a subgrade should be over-excavated and replaced with a suitable structural fill. Wet-Weather Considerations: As discussed above, some of the on-site soils would be difficult to reuse as structural fill during wet weather. Consequently, the project specifications should include provisions for using imported, clean, granular fill during wet weather grading operations. For general structural fill purposes, we recommend using a well-graded sand and gravel, such as ―Ballast‖ or ―Gravel Borrow‖ per WSDOT 9-03.9(1) and 9-03.14, respectively. 5.2 Underground Utilities We understand that new storm drainage pipe and water lines will be installed along H Street NE, 5th Street NE, and 23rd Street SE. The following conclusions and recommendations are intended to be consistent with the City standards. Temporary Slopes: Configuration and maintenance of safe working conditions, including temporary excavation stability, is the responsibility of the contractor. All applicable local, state, and federal safety codes should be followed. Temporary excavations should either be shored or sloped in accordance with Safety Standards for Construction Work, Part N, WAC 296-155-650 through 66411. For planning purposes, we interpret the on-site soils to conform with the WAC Soil Type C, which corresponds to a maximum slope of 1.5 H:1V above the groundwater table. However, these interpreted soil types should be confirmed after the initial excavations have begun. In all cases, the utility installation should be in accordance with the City guidelines. Dewatering: Our explorations, B-5, B-7 and B-13 drilled along H Street, encountered groundwater 9 feet below the ground surface (elevation 66 feet) at the time of drilling. Boring B-6 was also drilled on H Street and probably would have encountered groundwater if it was drilled as deep as B-5 and B-7. A groundwater observation well was installed in borehole B-13, and the static groundwater table was measured to be 9.23 feet below the top of monument (approximately elevation 66 feet) on AMEC 12 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx May 14, 2013. A slug test was attempted within the observation well, however the groundwater level recovered in less than a minute; and therefore we were unable to collect any recovery data. Excavations below elevation 66 feet may encounter a significant flow of groundwater. Dewatering wells will probably be needed to lower the groundwater table during construction of the storm drain on H Street NE: between 5th Street NE and 8th Street NE. Groundwater was not encountered in the explorations drilled along 23rd Street SE and Park Avenue to depths of 9 feet below the ground surface. Note that groundwater levels probably fluctuate seasonally. Subgrade Soils: Based on our explorations, some of the utility excavations may encounter loose soils at the base of the excavations. If any loose, soft, organic soils or uncontrolled fill are encountered at the base of utility excavations, we generally recommend that they be over-excavated at least 12 inches and be replaced with ―Pipe Foundation Material‖ per WSDOT 9-03.17 and compacted to a uniform density of at least 95 percent (based on ASTM D-1557), as displayed in the City’s standard details for utility trenches. Soil Corrosivity: Our scope of work did not include corrosivity testing of the on-site soils. However, based on our classifications of these soils and on our previous corrosivity testing of similar soil types, we expect the on-site soils not to be corrosive to utilities. Bedding Soils: Utility pipe bedding should extend at least 6 inches outward from the pipe in all directions to ensure proper pipe support and protection during backfilling activities. We recommend using crushed surfacing top-course per WSDOT 9-03.9(3) or ―Gravel Backfill for Pipe Bedding‖ per WSDOT 9-03.12(3). Trench Backfill: Utility trench backfill should consist of well-graded granular soils such as ―Gravel Borrow,‖ per WSDOT 9-03.14 or ―Bank Run Gravel,‖ per WSDOT 9-03.19. Backfill Compaction: Utility trench backfill placed under pavement should be compacted to at least 95 percent, based on Modified Proctor ASTM D-1557. 5.3 Structural Fill The term "structural fill" refers to any materials used for building roadway embankments, backfilling trenches, and placed under pavements and sidewalks. Our comments, conclusions, and recommendations concerning structural fill are presented in the following paragraphs. Materials: Typical structural fill materials include gravel, crushed rock, quarry spalls, CDF, lean -mix concrete, and well-graded mixtures of sand and gravel (commonly called "gravel borrow" or "pit-run"). Recycled asphalt, concrete, and glass, which are derived from pulverizing the parent materials, are AMEC Project No. 3-917-17569-0 Printed on recycled paper 13 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx also potentially useful as structural fill in certain applications. Soils used for structural fill should not contain any organic matter or debris, or any individual particles greater than 6 inches in diameter. Fill Placement: Structural fill should be placed in horizontal lifts not exceeding 8 inches in loose thickness, and each lift should be thoroughly compacted with a mechanical vibratory compactor. Compaction Criteria: Using the Modified Proctor test (ASTM D-1557) as the standard, we recommend structural fill be used for the following applications and compacted to the following minimum densities: Fill Application Minimum Compaction Utility trench backfill Concrete driveway aprons Concrete sidewalk subgrade Asphalt pavement base and subbase Asphalt pavement subgrade (upper 2 feet) Asphalt pavement subgrade (below 2 feet) 95 percent 95 percent 90 percent 95 percent 95 percent 90 percent Subgrade Verification and Compaction Testing: Regardless of material or location, all structural fill should be placed over dense, unyielding subgrades prepared in accordance with the Site Preparation section of this report. The condition of all subgrades should be verified by a representative geotechnical engineer before filling or construction begins. In addition, fill soil compaction should b e verified by means of in-place density tests performed during fill placement so the adequacy of the soil compaction efforts may be evaluated as earthwork progresses. Soil Moisture Considerations: The suitability of soils used for structural fill depends primarily on their grain-size distribution and moisture content when they are placed. As the "fines" content (the soil fraction passing the U.S. No. 200 Sieve) increases, soils become more sensitive to small changes in moisture content. Soils containing more than about 5 percent fines (by weight) cannot be consistently compacted to a firm, unyielding condition when the moisture content is more than 2 percentage points above or below optimum. For fill placement during wet-weather site work, we recommend using "clean" fill, which refers to soils that have a fines content of 5 percent or less (by weight) based on the soil fraction passing the U.S. No. 4 Sieve. 5.4 Asphalt Pavements Our pavement design recommendations are based on the pavement design standards of the 1993 Guideline for Design of Pavement Structures by the American Association of State Highway and Transportation Officials (AASHTO) and the City of Auburn Design Standards dated August 2004. AMEC 14 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Traffic Volume: Traffic estimates were not provided for the project. We understand that the streets are classified as local residential streets and have an average daily traffic (ADT) ranging from 200 to 1,200 vehicles per day in accordance with Section 10.01.3 of the City of Auburn Design Standards dated August, 2004. Subgrade Soil Testing: Near-surface soil samples for CBR testing were collected from soil cuttings produced during our drilling operations. However, due to the limited amount of cuttings obtained from the upper near surface soils, samples of similar soils were mixed to obtain an amount of soils necessary to complete the CBR testing. Our test results indicate that the subgrade soils in the vicinity of H Street NE, 5th Street NE, and Park Avenue have a tested CBR of 23 percent, and the subgrade soils in the vicinity of 23rd Street SE have a tested CBR value of 6 percent. Soil Design Values: In our opinion, a design CBR value of 15 percent is appropriate based on 95 percent compaction of the subgrade for H Street NE, 5th Street NE, and Park Avenue, while a CBR value of 6 is appropriate for 23rd Street SE. It should be noted that we are reducing the CBR value from the tested value for H Street NE, 5th Street NE, and Park Avenue based on Standard Penetration Test (SPT) results, soil type, and correlated in-situ relative density. The design CBRs of 15 and 6 percent results in a correlated resilient modulus, Mr, of 14,457 and 8,043 pounds per square inch (psi), respectively. The resilient modulus was correlated through the non-linear relationship: Mr (psi) = 2555*CBR0.64 This correlation is taken from the WSDOT Pavement Guide Interactive (2003). Although, this correlation differs from the linear relationship provided in the AASHTO 93 guide, it is our opinion that this correlation more accurately reflects the actual resilient modulus. Drainage Values: Local drainage characteristics of proposed pavement areas are considered as fair. Fair drainage conditions resulted in a design drainage coefficient of 1.0 for asphalt pavements when applying the AASHTO 93 criteria for design. Serviceability: For flexible pavement design, initial and terminal serviceability indices of 4.5 and 3.0, respectively, were used along with an inherent reliability of 85 percent. Minimum Pavement Section: We recommend the following minimum pavement sections for the roadways.  H Street NE, 5th Street NE, and Park Avenue: Based on AMEC’s analysis, we recommend a minimum pavement section of 2 inches of HMA Class B Modified, over 2 inches of HMA Class AMEC Project No. 3-917-17569-0 Printed on recycled paper 15 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx E, over 6 inches of crushed surfacing base course (CSBC) for a typical 20-year design life. This is the City standard for local residential streets with good soils.  23rd Street SE: Based on AMEC’s analysis, we recommend a minimum pavement section of 2 inches of HMA Class B Modified, over 2 inches of HMA Class E, over 8 inches of crushed surfacing base course (CSBC) for a typical 20-year design life. This is the City standard for local residential streets with medium soils. Subgrade Preparation: All pavement subgrades should be proof-rolled with a loaded dump truck or heavy compactor to verify the density. Any areas where this proof-rolling operation reveals soft, organic, or pumping soils at or closely beneath the pavement subgrade, should be over-excavated and replaced with a suitable structural fill material. Where soft, wet soils are encountered at the bottom of over-excavations, the surface can be stabilized by working quarry spalls into the subgrade. This or other subgrade improvement methods should be done under the observation of the geotechnical engineer. Geotextile: Due to the loose, silty subgrade underlying all of the streets, a geotextile should be placed over the subgrade prior to placing fill or base course. The geotextile should be placed directly on the compacted subgrade in accordance with WSDOT Standard Specification 2-12, and the geotextile should meet the requirements for ―Soil Stabilization,‖ 9-33.1, Table 3. Pavement Recycling: It is anticipated that the project will produce asphalt and concrete rubble. These materials, or similar imported materials, can be considered for reuse during project construction if they are pulverized down to appropriate grain sizes. Recycled asphalt can be uniformly blended with base course materials in accordance with WSDOT Standard Specification 9-03.21(2). The specification also allows mixing recycled asphalt with materials including CSBC, Gravel Base, Select Borrow, and Common Borrow such that the mix has maximum bitumen content of 1.2 percent. Recycled concrete can be substituted for up to 100 percent of base course materials including CSBC and Gravel Base as well as borrow materials such as Gravel, Select, and Common Borrow. Recycled concrete should be used in accordance with WSDOT Standard Specification 9-03.21(3). Structural Fill: We anticipate only a limited amount of overexcavation, so there does not appear to be a need for large amounts of structural fill for reconstruction of the proposed roadways. If structural fill is required to raise grades, we recommend using imported, clean, well-graded sand and gravel, such as "Ballast" or "Gravel Borrow" per WSDOT Standard Specifications 9-03.9(1) and 9-03.14, respectively. All structural fill should be compacted according to recommendations given in the Structural Fill section. Specifically, the upper 2 feet of soils underlying the asphalt pavement should be compacted to at least 95 percent (based on ASTM D-1557), and all soils below 2 feet should be compacted to at least 90 percent. AMEC 16 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx Base Materials: For the base course, we recommend using imported, clean, crushed rock, such as "Crushed Surfacing Base Course" (CSBC) per WSDOT Standard Specification 9-03.9(3). In addition, the current asphalt pavement material may be pulverized and recycled to use as a base course for the new pavement section, or structural fill beneath the pavement section. Compaction: All base course and subbase course material should be compacted to at least 95 percent of the Modified Proctor maximum dry density (ASTM D-1557), and all asphalt concrete should be compacted to at least 92 percent of the Rice Value (ASTM D-2041). We recommend a representative of the geotechnical engineer be retained to verify subgrades and the compaction of each course before the successive course is placed. This is best accomplished by means of frequent density testing for both the subbase and pavement courses. For the base course, methodology observations and hand-probing are more appropriate than density testing. Pavement Life and Maintenance: It should be noted that no asphalt pavement is maintenance-free. The above-described pavement sections represent our minimum recommendations for an average level of performance during a 20-year design life; therefore, an average level of maintenance will likely be required. Furthermore, it is possible that a 20-year pavement life will need an overlay to be placed after about 10 years. Thicker asphalt, base, and subbase courses would offer better long-term performance, but would cost more initially; thinner courses would be more susceptible to "alligator" cracking and other failure modes. Therefore, pavement design can be considered a compromise between a high-initial cost and low-maintenance costs versus a low-initial cost and higher maintenance costs. 6.0 RECOMMENDED ADDITIONAL SERVICES Because the future performance of the pavement and the integrity of the utilities will depend largely on proper site preparation, fill placement, and construction procedures, monitoring and testing by experienced geotechnical personnel should be considered an integral part of the construction process. Consequently, we recommend the following geotechnical construction monitoring be performed:  Attend a pre-construction conference with the design team and contractor to discuss important geotechnical construction issues;  Review the utility trench dewatering design submitted by the contractor;  Observe all exposed subgrades to confirm that suitable soil conditions have been reached and to determine if over-excavation in needed and appropriate subgrade compaction; and FIGURES APPENDIX A Field Exploration Procedures and Logs AMEC Project No. 3-917-17569-0 Printed on recycled paper A–1 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx APPENDIX A FIELD EXPLORATION PROCEDURES AND LOGS 3-917-17569-0 The following paragraphs describe our procedures associated with the field explorations and field tests AMEC Environment & Infrastructure, Inc. (AMEC), conducted for this project. Descriptive logs of our explorations are enclosed in this appendix. AUGER BORING PROCEDU RES Our exploratory borings were advanced with a hollow-stem auger, using a truck-mounted drill rig operated by an independent drilling firm working under subcontract to AMEC. An AMEC geologist continuously observed the borings, logged the subsurface conditions, and collected representative soil samples. All samples were stored in watertight containers and later transported to our laboratory for further visual examination and testing. After each boring was completed, the borehole was backfilled with a mixture of bentonite chips and soil cuttings, and the surface was patched with asphalt or concrete (where appropriate). Throughout the drilling operation, soil samples were obtained at a continues, 2.5- or 5-foot depth intervals by means of the Standard Penetration Test (SPT) per American Society for Testing and Materials (ASTM) D-1586. This testing and sampling procedure consists of driving a standard 2-inch diameter steel split-spoon sampler 18 inches into the soil with a 140-pound hammer free-falling 30 inches. The number of blows required to drive the sampler through each 6-inch interval is counted, and the total number of blows struck during the final 12 inches is recorded as the Standard Penetration Resistance, or "SPT blow count." If a total of 50 blows are struck within any 6-inch interval, the driving is stopped and the blow count is recorded as 50 blows for the actual penetration distance. The resulting Standard Penetration Resistance values indicate the relative density of granular soils and the relative consistency of cohesive soils. The enclosed Boring Logs describe the vertical sequence of soil s and materials encountered in each boring, based primarily on our field classifications and supported by our subsequent laboratory examination and testing. Where a soil contact was observed to be gradational, our logs indicate the average contact depth. Where a soil type changed between sample intervals, we inferred the contact depth. Our logs also graphically indicate the blow count, sample type, sample number, and approximate depth of each soil sample obtained from the borings, as well as any laboratory tests performed on these soil samples. If any groundwater was encountered in a borehole, the approximate groundwater depth is depicted on the boring log. Groundwater depth estimates are typically based on the moisture content of soil samples, the wetted height on the drilling rods, and the water level measured in the borehole after the auger has been extracted. AMEC A–2 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx WELL INSTALLATION PR OCEDURES Our groundwater observation well consists of 2-inch-diameter PVC pipe, the lower 5 feet of which is finely slotted. The annular space around the slotted segment was backfilled with clean sand, and the upper portion of the annulus was sealed with bentonite chips and concrete. A flush-mounted, steel monument was placed over the top of the wellhead for protection. The as-built configuration of the observation well is illustrated on the respective Boring Log. 6 S-1 S-2 S-3 5-inches of Asphalt over 13-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Very loose, moist, brown, silty, fine SAND with trace organics (Alluvium) SM Piece of wood with some black organics at 5 feet Sampler pushed down by weight of rods Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 78.0 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Organic Content (% shown) 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 Park Avenue ~Station 71+63 & 5' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: No Recovery BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-1 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 3 0 2 4 S-1 S-2 S-3 2 1/2-inches of Asphalt over 12-inches of Crushed Rock Very loose, moist, brown, silty, fine SAND (Alluvium) SM Very loose, moist, blackish gray, fine to medium SAND with trace silt and gravel and piece of wood at 6 feet (Alluvium) SP Dense, moist, blackish gray, fine to medium SAND with trace silt (Alluvium) SP Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 77.5 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 Park Avenue ~Station 74+47 & 22' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-2 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 2 2 31 S-1 S-2 S-3 4-inches of Asphalt over 26-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Very loose, moist, brown, silty, fine SAND (Alluvium) SM Very loose, damp to moist, brownish blackish gray, fine to medium SAND with some silt (Alluivum) SP-SM Loose, moist to wet, blackish brownish gray, silty, fine SAND interbedded medium stiff, moist to wet, yellowish brown, sandy SILT with trace of gravel and organics (Alluvium) SM-ML Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 76.6 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 Park Avenue ~Station 62+58 & 2' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-3 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 4 3 6 2 S-1 S-2 S-3 2 1/2-inches of Asphalt over 15 1/2-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Loose, damp to moist, brown, silty, fine SAND (Alluvium) SM Very loose to loose, damp to moist, blackish brownish gray, fine to medium SAND with some gravel and trace silt (Alluvium) SP Becoming blackish gray Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 74.7 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 5th Street NE ~Station 31+65 & 6' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-4 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 7 5 4 3 S-1 S-2 S-3 S-4 2-inches Asphalt over 7-inches Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Loose, damp to moist, brown, silty, fine SAND (Alluvium) SM Dense, moist, brown, sandy GRAVEL with trace to some silt (Alluivum) GP-GM Medium dense, moist to wet, blackish gray, fine to medium SAND with trace silt and fine gravel (Alluvium) SP Medium dense, saturated, brownish gray, sandy GRAVEL with trace silt (Alluvium) GP Boring terminated at approximately 11.5 feet 03-28-13 SA M P L E NU M B E R 0 5 10 15 74.6 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 Groundwater level at time of drilling 0DE P T H (f e e t ) HWB Blows per foot Standard 50 5th Street NE ~Station 30+32 & 6' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-5 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 8 32 14 27 8 S-1 S-2 S-3 1-inch Asphalt over; Very loose, damp to moist, brown, silty, fine SAND (Alluvium) SM Silt lens from 3.0 to 3.2 feet Very loose, moist, brownish blackish gray, fine to medium SAND with trace gravel and some silt (Alluvium) SP-SM Loose, moist, blackish gray, fine to medium SAND with trace silt and gravel (Alluvium) SP Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 74.7 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 H Street NE ~Station 24+47 & 6' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-6 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 3 3 8 23 33 G-1 S-1 S-2 S-3 S-4 1 1/2-inch Asphalt over 2-inches of coarse GRAVEL over 6-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Very loose, moist, brown, silty, fine SAND (Alluvium) SM Silt lens from 3.0 to 3.5 feet Loose, damp to moist, brownish blackish gray, fine to medium SAND with trace to some silt (Alluivum) SP-SM Becomes moist to wet Piece of organic wood at 8.5 feet Very loose, satuarated, slight orange brown mottling in blackish gray, fine to medium SAND with trace to some silt and piece of organic wood (Alluvium) SP-SM Boring terminated at approximately 11.5 feet 03-28-13 Grain Size Analysis (% fines shown) SA M P L E NU M B E R 0 5 10 15 74.9 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: California Bearing Ratio 10 20 30 40 Groundwater level at time of drilling 0DE P T H (f e e t ) HWB Blows per foot Standard 50 H Street NE ~Station 21+38 & 5' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: 2.00-inch OD split-spoon sampler BORING No. Geologic Drill GR O U N D WA T E R Grab Sample March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-7 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 4 5 3 4 23 33 G-1 S-1 S-2 S-3 1 1/2-inches of Asphalt over 16 1/2-inches of Base Course (medium dense to dense, moist, yellowish brown to brown, sandy GRAVEL with some silt-GP) Very loose, damp to moist, brown, silty, fine SAND with trace rootlets (Alluvium) SM Gray SILT lens from 5 to 5.5 feet Becomes loose and brownish gray Loose, damp to moist, brownish blackish gray, fine to medium SAND with trace to some silt (Alluvium) SP-SM Medium dense, moist to wet, yellowish brown to brownish gray, sandy GRAVEL with trace to some silt (Alluviam) GP-GM Boring terminated at approximately 9 feet Grain Size Analysis (% fines shown) SA M P L E NU M B E R 0 5 10 15 76.5 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: California Bearing Ratio 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 H Street NE ~Station 11+90 & 5' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: 2.00-inch OD split-spoon sampler BORING No. Geologic Drill GR O U N D WA T E R Grab Sample March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-8 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 3 6 26 6 23 G-1 S-1 S-2 S-3 50/5 50/0 2- to 2 1/2-inches of Asphalt over 6-inches of <1" Crushed Rock Loose, moist, brown, silty, fine SAND stratified in tip of drive shoe (Alluvium) SM Medium dense to dense, moist, brown, sandy GRAVEL with some silt (Alluvium) GP-GM Blow counts overstated; bouncing on gravel Blow counts overstated; bouncing on gravel Boring terminated at approximately 7.5 feet Grain Size Analysis (% fines shown) SA M P L E NU M B E R 0 5 10 15 124.6 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: California Bearing Ratio 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 23rd Street SE ~Station 41+26 & 4' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: 2.00-inch OD split-spoon sampler No Recovery BORING No. Geologic Drill GR O U N D WA T E R Grab Sample March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-9 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 9 27 S-1 S-2 S-3 2 1/2-inches of Asphalt over 6-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Loose, moist, brown to dark gray, silty SAND with some gravel and trace debris (fragments of brick, glass, etc.) (Fill) SM Loose, moist, brown, silty, fine SAND with interbeds of soft to medium stiff, moist, brown, sandy SILT lenses (Alluvium) SM-ML Dense, moist, brownish gray, sandy GRAVEL with some silt (Alluvium) GP-GM Boring terminated at approximately 9 feet SA M P L E NU M B E R 0 5 10 15 126.1 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 23rd Street SE ~Station 43+85 & 5' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-10 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 5 5 37 S-1 S-2 63 2 1/2-inches Asphalt over 2 1/2-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Very loose, moist, brown to dark gray, silty SAND with some gravel and trace debris (fragments of brick, glass, etc.) (Fill) SM Very loose to loose, damp to moist, brownish blackish gray, fine to medium SAND with some silt (Alluvium) SP-SM Very dense, damp to moist, brown, sandy GRAVEL with some silt (Alluvium) GP-GM Boring terminated at approximately 6.5 feet SA M P L E NU M B E R 0 5 10 15 127.4 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 23rd Street SE ~Station 45+70 & 4' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-11 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 2 6 23 16 G-1 S-1 S-2 S-3 2 1/2-inches of Asphalt over 5-inches of Base Course (medium dense to dense, moist, brown, sandy GRAVEL with some silt-GP) Very loose, damp to moist, brown, silty fine SAND (Alluvium) SM Silt lens from 3.3 to 3.5 feet Loose, damp to moist, brownish blackish gray, silty, fine to medium SAND (Alluvium) SM Boring terminated at approximately 9 feet Grain Size Analysis (% fines shown) SA M P L E NU M B E R 0 5 10 15 129.0 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: California Bearing Ratio 10 20 30 40 No groundwater encountered 0DE P T H (f e e t ) HWB Blows per foot Standard 50 23rd Street SE ~Station 48+93 & 5' R City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: 2.00-inch OD split-spoon sampler BORING No. Geologic Drill GR O U N D WA T E R Grab Sample March 28, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-12 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 4 6 7 4 4 S-1 S-2 S-3 S-4 S-5 S-6 S-7 S-8A S-8B S-9 1 1/2-inch Asphalt over 10 1/2-inches of Base Course (medium dense to dense, moist, gray-brown, sandy GRAVEL with some silt-GP) Very loose, moist, brown, silty, fine SAND (Alluvium) SM Mottled orangish brown in brown-gray SILT lens at 3.8 to 4.0 feet Medium dense, damp to moist, yellowish brown, sandy GRAVEL with trace to some silt (Alluvium) GP-GM Blow counts overstated due to gravel Medium dense, saturated, brownish gray, sandy GRAVEL with trace silt (Alluvium) GP Grades to gravelly SAND/sandy GRAVEL from 15 to 18.5 feet Medium dense, saturated, brown, fine SAND with some silt (Alluvium) SP-SM 3 feet of heave in HSA; driller flushed out Mediium dense, saturated, blackish gray, gravelly SAND with trace silt (Alluvium) SP Medium dense, saturated, blackish gray, fine to medium SAND with trace silt (Alluvium) SP 4+ feet of heave in HSA; driller flushed out Unique DOE Well #BHJ-200 Boring terminated at approximately 26.5 feet 5/14/13 SA M P L E NU M B E R 0 5 10 15 20 25 30 75.0 feet US C S / U S G S GR A P H I C S Other PROJECT: TESTING Date drilled: JOB No. PENETRATION RESISTANCE Hammer Type: Grain Size Analysis (% fines shown) 10 20 30 40 Observed groundwater level 0DE P T H (f e e t ) HWB Blows per foot Standard 50 H Street NE ~Station 22+59 & 13' L City of Auburn 2013 Local Street Pavement Reconstruction Project Logged By: LEGEND Drilling Method: SA M P L E TY P E Drilled by: BORING No. Geologic Drill GR O U N D WA T E R 2.00-inch OD split-spoon sampler May 08, 2013CatheadHSA Page 1 of 1 3-917-17569-0 B-13 Location: Approximate ground surface elevation: Soil Description 11810 North Creek Parkway N Bothell, WA 98011 BO T H E L L _ L O G F O R M A T 2 0 1 2 C I T Y O F A U B U R N 2 0 1 3 L O C A L S T R E E T P A V E M E N T R E C O N S T R U C T I O N P R O J E C T . G P J B O T H E L L G E O 2 0 1 0 B & T P . G D T 5 / 1 6 / 1 3 Bentonite Fill with PVC Pipe Groundwater Level Sand Fill with Slotted PVC Pipe Pipe Cap Slough at Bottom of Hole Observation well: Monument Blows over inches#/# MOISTURE CONTENT 20 40 60 80 Liquid Limit 100 Plastic Limit 0 2 47 17 35 25 13 23 13 20 APPENDIX B Laboratory Testing Procedures and Results AMEC Project No. 3-917-17569-0 Printed on recycled paper B–1 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx APPENDIX B LABORATORY TESTING PROCEDURES AND RESULTS 3-917-17569-0 The following paragraphs describe our procedures associated with the laboratory tests AMEC conducted for this project. Graphical results of certain laboratory tests are enclosed in this appendix. VISUAL CLASSIFICATIO N PROCEDURES Visual soil classifications were conducted on all samples in the field and on selected samples in our laboratory. All soils were classified in general accordance with the United Soil Classification System, which includes color, relative moisture content, primary soil type (based on grain size), and any accessory soil types. The resulting soil classifications are presented on the exploration logs contained in Appendix A. MOISTURE CONTENT DET ERMINATION PROCEDURE S Moisture content determinations were performed on representative samples to aid in identification and correlation of soil types. All determinations were made in general accordance with ASTM D-2216. The results of these tests are shown on the exploration logs contained in Appendix A. GRAIN -SIZE ANALYSIS PROCED URES A grain-size analysis indicates the range of soil particle diameters included in a particular sample. Grain-size analyses were performed on representative samples in general accordance with ASTM D-422. The results of these tests are presented on the enclosed grain-size distribution graphs and were used in soil classifications shown on the exploration logs contained in Appe ndix A. ORGANIC CONTENT Test method ASTM D-2974-87 covers the measurement of organic matter, ash content and moisture content in peats and other organic soils, such as organic clays and silts. The results of these tests are shown on the exploration logs contained in Appendix A. AMEC B–2 Printed on recycled paper Project No. 3-917-17569-0 \\SEA-FS1\WordProc\_Projects\17000s\17569 Jacobs Engineering\Auburn 2013 Street Reconstruction Report 130516.docx CALIFORNIA BEARING R ATIO PROCEDURES A California Bearing Ratio (CBR) test provides a quantitative prediction of the relative quality and support characteristics of a saturated soil when subjected to wheel loads. CBR tests were performed on selected samples in general accordance with ASTM D-1883. Representative portions from each sample are compacted in a mold to obtain a moisture-density relationship curve, a 15-pound surcharge is applied to each sample, and the samples are then immersed in water for at least 96 hours, during which time they are monitored for swell. Next, a vertical load is applied to the surcharged soil with a penetration piston moving at a constant rate of strain, while the associated penetrations are measured and compared with the theoretical strain of crushed rock. The ratio of the measured and theoretical loads (in percent) is defined as the CBR value for the soil at that particular density. The enclosed CBR graphs present our test results as a plot of density and resistance versus moisture content. Project Name: 2013 Local St Pavement Reconstruction Date:4/16/2013 Project Number: 3-917-17569-0 Client: City of Auburn/Amec Sample:B-1 B-1 B-2 Location:S-1 S-2 S-1 Depth:2.5-4'5-6.5'2.5-4' Organic Content, percent:N/A 5.88%N/A Moisture Content:18.1%47.4%23.4% Sample:B-7 B-11 Location:S-1 S-1 2.5-4'2.5-4' Organic Content, percent:N/A N/A Moisture Content:29.5%23.30% Tested by: JW Reviewed by: JW Respectfully submitted, By Jeff Ward Report of Determination Organic Content ASTM D2974/ D2216 Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded sand Moisture: 14.8%3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 98 97 95 91 76 43 15 4.0 NP NV NP 0.7269 0.5482 0.3238 0.2793 0.2047 0.1496 0.1261 2.57 1.03 SP A-3 ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-2, S-2 Sample Number: 5127.5 Depth: 5-6.5'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 0 3 2 19 72 4 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded sand Moisture: 3.9%5/8" 1/2" 3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 99 97 93 90 80 69 59 37 11 1.9 NP NV NP 4.5406 2.9430 0.4457 0.3279 0.2184 0.1640 0.1446 3.08 0.74 SP A-3 ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-4, S-2 Sample Number: 5127.7 Depth: 5-6.5'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 0 10 10 21 57 2 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded gravel with sand Moisture: 7.6%1.25" 1" 3/4" 5/8" 1/2" 3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 73 64 58 51 44 37 33 26 23 20 12 6 2.6 NP NV NP 29.5684 28.4701 16.8542 12.1599 3.7515 0.3062 0.2229 75.62 3.75 GP A-1-a ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-5, S-4 Sample Number: 5127.8 Depth: 10-11.5'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 36 31 7 6 17 3 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded sand with silt Moisture: 8.2%1/4" #4 #10 #20 #40 #60 #100 #200 100 99 96 92 84 65 32 8.2 NP NV NP 0.6464 0.4371 0.2286 0.1968 0.1437 0.0978 0.0807 2.83 1.12 SP-SM A-3 ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-6, S-2 Sample Number: 5127.9 Depth: 5-6.5'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 0 1 3 12 76 8 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff Ward Checked By: Jeff Ward Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Silty sand Moisture: 9.2%1.25" 1" 3/4" 5/8" 1/2" 3/8" #4 #10 #20 #40 #60 #100 #200 100 99 98 97 95 93 88 84 81 78 73 60 33 NP NV NP 6.4574 2.7944 0.1495 0.1135 SM A-2-4(0) ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-7 and B-8 Sample Number: 5127.1 Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 2 10 4 6 45 33 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Silty sand Moisture: 10.4%1.5" 1.25" 1" 3/4" 5/8" 1/2" 3/8" #4 #10 #20 #40 #60 #100 #200 100 100 99 99 98 96 95 92 90 89 86 72 48 23 NP NV NP 2.0369 0.4007 0.1917 0.1565 0.0927 SM A-2-4(0) ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-9 and B-12 Sample Number: 5127.2 Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 1 7 2 4 63 23 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Silty sand Moisture: 23.3%1" 3/4" 5/8" 1/2" 3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 98 97 95 93 92 91 88 85 81 70 52 27 NP NV NP 4.1126 0.7787 0.1864 0.1423 0.0812 SM A-2-4(0) ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-10, S-1 Sample Number: 5127.11 Depth: 2.5-4'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 2 7 3 7 54 27 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Jeff W Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 4/16/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Silty sand Moisture: 12.6%#4 #10 #20 #40 #60 #100 #200 100 100 100 96 82 50 16 NP NV NP 0.3047 0.2644 0.1750 0.1509 0.1042 SM A-2-4(0) ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-12, S-2 Sample Number: 5127.13 Depth: 5-6.5'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 0 0 0 4 80 16 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Brian D Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 5/15/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded gravel with sand Moisture: 11.1%1.25" 1" 3/4" 5/8" 1/2" 3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 82 76 68 58 53 48 45 39 33 25 16 8 3.8 NP NV 28.5343 26.7679 13.3123 7.2309 0.6256 0.2412 0.1770 75.19 0.17 GP A-1-a ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-13, S-5 Sample Number: 5151.1 Depth: 12.5-14.0'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 24 31 6 14 21 4 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report Tested By: Brian D Checked By: Jeff W Terracon Consultants, Inc. Mountlake Terrace, WA 5/15/2013 (no specification provided) PL=LL=PI= D90=D85=D60=D50=D30=D15= D10=Cu=Cc= USCS=AASHTO= * Poorly graded sand with gravel Moisture: 12.6%1.5" 1.25" 1" 3/4" 5/8" 1/2" 3/8" 1/4" #4 #10 #20 #40 #60 #100 #200 100 86 71 67 64 61 59 55 53 49 43 36 20 9 3.6 NP NV 33.5288 31.4755 11.1932 2.5402 0.3393 0.2029 0.1570 71.28 0.07 SP A-1-b ASTM: C136, D1140, D2216 City of Auburn/Amec 2013 Local St. Pavement Reconstruction 3917175690 Material Description Atterberg Limits Coefficients Classification Remarks Location: B-13, S-7 Sample Number: 5151.2 Depth: 17.5-19.0'Date: Client: Project: Project No:Figure SIEVE PERCENT SPEC.*PASS? SIZE FINER PERCENT (X=NO) PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0 33 14 4 13 32 4 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 Particle Size Distribution Report BEARING RATIO TEST REPORT ASTM D 1883-07 BEARING RATIO TEST REPORT Terracon Consultants, Inc. Project No: 3917175690 Project: 2013 Local St. Pavement Reconstruction Location: B-7 and B-8 Sample Number: 5127.1 Date: 4/16/2013 Silty sand Moisture: 9.2% Test Description/Remarks: Figure 117.3 11.0 NV NPSM Material Description USCS Max. Dens. (pcf) Optimum Moisture (%) LL PI Molded Density (pcf) Percent of Max. Dens. Moisture (%) Soaked Density (pcf) Percent of Max. Dens. Moisture (%) CBR (%) 0.10 in.0.20 in. Linearity Correction (in.) Surcharge (lbs.) Max. Swell (%) 1 109.4 93.3 10.3 109.4 93.3 15.6 18.5 23.1 0.000 10 0 2 115.9 98.8 10.3 115.9 98.8 13.5 30.9 51.4 0.000 10 0 3 120.2 102.5 10.3 120.2 102.5 12.5 35.3 57.2 0.000 10 0 Pe n e t r a t i o n R e s i s t a n c e ( p s i ) 0 300 600 900 1200 1500 Penetration Depth (in.) 0 0.1 0.2 0.3 0.4 0.5 Sw e l l ( % ) 0 0.1 0.2 0.3 0.4 0.5 Elapsed Time (hrs) 0 24 48 72 96 CB R ( % ) 10 20 30 40 50 Molded Density (pcf) 104 108 112 116 120 124 10 blows 25 blows 56 blows CBR at 95% Max. Density = 22.9% for 0.10 in. Penetration BEARING RATIO TEST REPORT ASTM D 1883-07 BEARING RATIO TEST REPORT Terracon Consultants, Inc. Project No: 3917175690 Project: 2013 Local St. Pavement Reconstruction Location: B-9 and B-12 Sample Number: 5127.2 Date: 4/16/2013 Silty sand Moisture: 10.4% Test Description/Remarks: Figure 111.6 12.3 NV NPSM Material Description USCS Max. Dens. (pcf) Optimum Moisture (%) LL PI Molded Density (pcf) Percent of Max. Dens. Moisture (%) Soaked Density (pcf) Percent of Max. Dens. Moisture (%) CBR (%) 0.10 in.0.20 in. Linearity Correction (in.) Surcharge (lbs.) Max. Swell (%) 1 104.2 93.4 11.8 104.2 93.4 16.8 8.2 11.5 0.000 10 0 2 110.4 98.9 11.8 110.4 98.9 14.2 7.3 15.0 0.000 10 0 3 113.6 101.8 11.8 113.6 101.8 15.6 16.0 27.3 0.000 10 0 Pe n e t r a t i o n R e s i s t a n c e ( p s i ) 0 150 300 450 600 750 Penetration Depth (in.) 0 0.1 0.2 0.3 0.4 0.5 Sw e l l ( % ) 0 0.1 0.2 0.3 0.4 0.5 Elapsed Time (hrs) 0 24 48 72 96 CB R ( % ) 4 8 12 16 20 Molded Density (pcf) 101 104 107 110 113 116 10 blows 25 blows 56 blows CBR at 95% Max. Density = 6.4% for 0.10 in. Penetration