HomeMy WebLinkAbout2022-2027 Capital Facilities PlanCAPITAL FACILITIES PLAN (2022 – 2027) Adopted by Ordinance No. 6840, December 6, 2021 as part of the City of Auburn Comprehensive Plan City of Auburn 25 West Main Auburn, WA 98001 (253) 931-3000 www.auburnwa.gov City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 2022 – 2027 TABLE OF CONTENTS Executive Summary .................................................................................................................... 1 1. Introduction Purpose .................................................................................................................................. 7 Statutory Requirement for Capital Facilities Elements ............................................................. 7 Concurrency and Level of Service........................................................................................... 8 Implementation ....................................................................................................................... 8 2. Goals and Policies 1. Capital Facilities Response to Growth ............................................................................... 11 2. Financial Feasibility ........................................................................................................... 11 3. Public Health and Environment ......................................................................................... 13 4. Consistency with Regional Planning .................................................................................. 13 3. Capital Improvements Introduction ............................................................................................................................. 15 Transportation ......................................................................................................................... 17 Arterial Street (102) Capital Projects ................................................................................. 22 Local Street (103) Capital Projects .................................................................................... 57 Street Preservation Fund (105) Capital Projects ............................................................... 60 Water ...................................................................................................................................... 71 Sanitary Sewer........................................................................................................................ 119 Storm Drainage ....................................................................................................................... 141 Parks, Arts and Recreation ..................................................................................................... 173 General Municipal Buildings .................................................................................................... 195 Community Improvements ...................................................................................................... 205 Airport ..................................................................................................................................... 225 Cemetery ................................................................................................................................ 239 Valley Regional Fire Authority ................................................................................................. 243 City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan EXECUTIVE SUMMARY A capital facilities element is one of the comprehensive plan elements required by Washington’s Growth Management Act (GMA). Capital facilities generally have long useful lives, significant costs and tend not to be mobile. The GMA requires that capital facilities elements include an inventory of existing capital facilities showing locations and capacities, a forecast of future needs for such capital facilities, proposed locations and capacities of new or expanded capital facilities and at least a six-year plan to finance capital facilities with identified sources of funding. The GMA also requires that the land use element be reassessed if probable funding falls short of existing needs. This document is the City’s six-year Capital Facilities Plan (CFP). The CFP, in conjunction with other City adopted documents, satisfies the GMA requirement for a Capital Facilities Element. It addresses one of the GMA’s basic tenets: to provide adequate facilities to support development in accordance with locally adopted level of service standards. This CFP will enable the City to: (1) make informed decisions about its investment of public dollars, and (2) make timely decisions about maintaining level of service in accordance with this CFP and other adopted plans. CAPITAL FACILITIES PLAN CONTENT This CFP consists of the following: Chapter 1. Introduction Purpose of CFP, statutory requirements, methodology. Chapter 2. Goals and Policies Goals and policies related to the provision of capital facilities. Chapter 3. Capital Improvements Proposed capital projects, which include the financing plan and reconciliation of project capacity to level of service (LOS) standards. This CFP is a companion document to the Capital Facilities Element of the Auburn Comprehensive Plan. The Capital Facilities Element of the Auburn Comprehensive Plan identifies the City’s planning approach and policy framework for the provision of capital facilities. This CFP provides the background inventory, identifies proposed projects and establishes the six-year capital facilities plan for financing capital facilities. The comprehensive plan contains timeframes that are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these timeframes are estimates; depending on factors involved in the processing of applications and project work, and the availability of funding, the timing may change from the included timeframes. The framework does not represent actual commitments by the City of Auburn that may depend on funding resources available. 1 City of Auburn Capital Facilities Plan GROWTH ASSUMPTIONS In planning for capital facilities, contemplation of future growth needs to be considered. The CFP is based on the following City population forecast: Year Population 2021 83,950 2022 85,041 2027 89,379 The population forecasts are based on information from the State of Washington Office of Financial Management (OFM) as well as estimates developed by the City of Auburn Planning and Community Development Department. CAPITAL COSTS OF FACILITIES Based on the analysis of capital improvements contained in this document, the cost of City- owned and managed capital improvements for 2022-2027 is summarized as follows: Type of Facility 2022 - 2027 Transportation - Arterial (102)45,822,630$ Transportation - Local (103)11,660,000 Transportation - Street (105)15,169,650 Water 50,318,838 Sanitary Sewer 16,129,879 Storm Drainage 22,733,259 Parks, Arts & Recreation 15,903,850 General Municipal Buildings 5,509,510 Community Improvements 9,483,400 Airport 16,876,460 Cemetery 355,000 Total 209,962,476$ 2 City of Auburn Capital Facilities Plan FINANCING FOR CAPITAL FACILITIES The financing plan for the citywide capital improvements includes: Funding Source 2022 - 2027 Capital Facility Grants 20,302,756 Transportation 2,195,500 Parks, Arts & Recreation 528,000 General Municipal Buildings 1,901,370 Community Improvements 400,000 Storm Drainage 7,248,330 Airport User Fees / Fund Balance 46,692,498 Water 16,708,539 Sewer 22,823,169 Storm Drainage 355,000 Cemetery 274,000 Equipment Rental 37,510 Facilities 3,368,130 Airport Arterial Street Fund 2,493,435 Transportation Local Street Preservation Fund 1,760,000 Transportation Arterial Street Preservation Fund 12,157,676 Transportation Local Revitalization Fund 245,000 Community Improvements General Fund 20,020 General Municipal Buildings Bond Proceeds 505,000 Water WSDOT Aviation Loan 750,000 Airport DWSRF Loan 3,700,000 Water Municipal Parks Fund 450,000 Parks, Arts & Recreation Property Tax 1,113,500 Parks, Arts & Recreation Mitigation/Impact Fees 20,860,913 Transportation 6,589,850 Parks, Arts & Recreation 500,000 General Municipal Buildings 1,494,060 Community Improvements REET 1 3,314,000 General Municipal Buildings 750,000 Transportation - Local Streets 300,000 Parks, Arts & Recreation REET 2 4,605,500 Community Improvements 180,000 Parks, Arts & Recreation 930,000 Transportation - Arterial Streets 750,000 Transportation - Local Streets Other Sources 4,247,500 Transportation - Arterial Streets 7,500,000 Transportation - Local Streets 1,237,470 Community Improvements 5,510,000 Airport 88,750 Storm Drainage 5,075,000 Parks, Arts & Recreation Total 209,962,476$ (Includes grant funding that has not been secured) 3 City of Auburn Capital Facilities Plan SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS The forecasted impacts of new capital facilities on the City’s future operating budgets (2023- 2028) are as follows: Budget Year:2023 2024 2025 2026 2027 2028 Total 1 Transportation 4,000$ 9,000$ 10,000$ 16,000$ 16,000$ 19,000$ 74,000$ 2 Water - - - - - - - 3 Sanitary Sewer - - - - - - - 4 Storm Drainage - - - - - - - 5 Parks, Arts and Recreation 15,000 15,000 17,000 17,000 22,000 22,000 108,000 6 General Municipal Buildings - 95,000 95,000 95,000 95,000 95,000 475,000 7 Community Improvements (137,500) (137,500) (127,500) (127,500) (127,500) (127,500) (785,000) 8 Airport - 2,000 2,000 4,000 4,000 4,000 16,000 9 Cemetery - - - - - - - Total (118,500)$ (16,500)$ (3,500)$ 4,500$ 9,500$ 12,500$ (112,000)$ Project summary details are located on the following pages: Transportation page 70 Parks & Recreation page 193 General Municipal Buildings page 203 Community Improvements page 223 Airport page 237 4 City of Auburn Capital Facilities Plan LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP Based on the proposed six-year capital projects and the projected population increase of 4,338 (5%) between 2022 and 2027, the LOS for the following City-owned public facilities will change as follows: The LOS for the following facilities will be increased as a result of the CFP, comparing the 2022 LOS to the projected 2027 LOS. CAPITAL FACILITY LOS UNITS 2022 LOS 2027 LOS (Projected) Community Parks Acres per 1,000 Pop.2.80 3.12 Linear Parks Acres per 1,000 Pop.0.20 0.23 Neighborhood Parks Acres per 1,000 Pop.0.77 0.83 The LOS for the following facilities will be maintained as a result of the CFP. CAPITAL FACILITY LOS UNITS 2022 LOS 2027 LOS (Projected) Roads Volume/Capacity Ratio "D" "D" Airport % Air Operations Support 100% 100% Cemetery Burial Plots per 1,000 Pop.32.00 30.00 Sanitary Sewer Residential GPCPD (Note 1)171.00 171.00 Storm Drainage N/A Water Residential GPCPD (Note 1)230.00 230.00 Note 1: GPCPD = Gallons per Customer per Day The LOS for the following facilities will be decreased as a result of the CFP, comparing the 2022 LOS to the projected 2027 LOS. CAPITAL FACILITY LOS UNITS 2022 LOS 2027 LOS (Projected) General Municipal Buildings Sq. Ft. per 1,000 Pop.3,725.36 3,543.83 Open Space Acres per 1,000 Pop.4.56 4.34 Senior Center Sq. Ft. per 1,000 Pop.145.32 136.50 Special Use Areas Acres per 1,000 Pop.3.03 2.85 Level of Service (LOS) is a common measure used to determine the efficiency or effectiveness of services. For the City of Auburn, LOS targets serves as a means to assess the adequacy of public facilities in meeting the needs of the population for which it serves. 5 City of Auburn Capital Facilities Plan For example, in the case of park space, when there is an increase in population without a corresponding increase in park acreage, the LOS unit of measure (acres per 1,000 population) will decline, indicating a potential need to increase the total amount of park acreage to keep pace with population growth. On the other hand, a slight increase in population, coupled with a large increase in facilities, will result in an increased LOS. For example, facilities such as buildings or burial plots may be constructed or expanded to keep pace with anticipated population growth. While this will have the effect of increasing LOS in the short-term, in the longer-term, the LOS will gradually decline to the targeted level based on forecasted population. The impact of population growth to the LOS for facilities will vary depending on the type of facility and long range planning by the City. CFP ELEMENT SOURCE DOCUMENTS Documents used in preparing this Capital Facilities Plan (CFP) are principally the comprehensive plans for the various public facilities included in this CFP. These individual comprehensive plans provide detailed identification of projects and identify their (projects) proposed funding sources. City documents include: • City-wide Comprehensive Land Use Plan (2015) • City Municipal Airport Master Plan Update (2012-2032) • City Comprehensive Water Plan (2015) • City Comprehensive Transportation Plan (2015) and Six Year Transportation Improvement Program (2022-2027) • City Comprehensive Drainage Plan (2015) • City Comprehensive Sewer Plan (2015) • City 2021-22 Biennial Budget and 2020 Annual Financial Report; and, • City Parks, Recreation & Open Space Plan Update (2015), as well as numerous other planning and financial documents. All documents are available for public inspection at the City of Auburn. 6 City of Auburn Capital Facilities Plan CHAPTER 1 INTRODUCTION PURPOSE The Capital Facilities Plan (CFP) is a 6-year plan (2022-2027) for capital improvements that support the City of Auburn’s current and future growth. In this plan, funding for general government projects is identified. To maintain consistency with individual master and utility comprehensive plans, applicable projects in the 6-year window of those master/utility plans are included in this CFP. The CFP also identifies LOS standards, where applicable, for each public facility. STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS RCW 36.70A.070(3)(d) requires that the comprehensive plan capital facilities element include “a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes.” RCW 36.70A.070(3)(e) requires that all capital facilities have “probable funding” to pay for capital facility needs, or else the City must “reassess the land use element.” In addition, the capital facilities element must include the location and capacity of existing facilities, a forecast of future needs, and their proposed locations and capacities. The State Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation facilities, police and fire protection facilities. The GMA also seeks the selection of level of service standards for capital facilities. As a result, public facilities in the CFP should be based on quantifiable, objective measures of capacity such as traffic volume, capacity per mile of road and acres of park per capita. In some instances, though, level of service may best be expressed in terms of qualitative statements of satisfaction with a particular public facility. Factors that influence local level of service standards include, but are not limited to, community goals, national and local standards, and Federal and State mandates. To be effective, the CFP must be updated on a regular basis. State GMA guidelines suggest that the CFP be updated at least every two years. With this in mind, the City will follow these guidelines and update the CFP at least every two years, incorporating the capital facilities improvements in the City’s biennial budget process. 7 City of Auburn Capital Facilities Plan CONCURRENCY AND LEVEL OF SERVICE Concurrency The GMA requires that jurisdictions have certain capital facilities in place or available within a specified time frame when development occurs. This concept is called concurrency. Under the GMA, concurrency is required for transportation facilities and is recommended by the State for certain other public facilities, namely potable water and sanitary sewer. Concurrency has a direct relationship to level of service. The importance of concurrency to capital facilities planning is that development may be denied if it reduces the level of service for a capital facility below the locally adopted minimum. The level of service is unique for each type of facility and is presented in the subsequent sections. Explanation of Level of Service As indicated earlier, the GMA requires that level of service be established for certain transportation facilities for the purposes of applying concurrency to development proposals. The State GMA guidelines recommend the adoption of level of service standards for other capital facilities to measure the provision of adequate public facilities. Typically, measures of level of service are expressed as ratios of facility capacity to demand (i.e., actual or potential users). Table 1-1 lists generic examples of level of service measures for some capital facilities: TABLE 1-1 Sample Level of Service Measurements The need for capital facilities is largely determined by a community’s adopted LOS standards and whether or not the community has formally designated capital facilities, other than transportation, as necessary for development to meet the concurrency test. The CFP itself is therefore largely influenced by the selection of the level of service standards. Level of service standards are measures of the quality of life in the City. The standards should be based on the City’s vision of its future and its values. IMPLEMENTATION Implementation of the CFP requires constant monitoring and evaluation. The CFP is sensitive to funding and revenue availability and therefore needs to be constantly monitored against variations in available resources. To facilitate its implementation, the CFP should be kept current. Type of Facility Sample Level of Service Measure General Municipal Buildings Square feet per 1,000 population Parks Acres per 1,000 population Roads and Streets Ratio of actual volume to design capacity Sewer / Water Gallons per customer per day 8 City of Auburn Capital Facilities Plan Update of Capital Facilities Plan Perhaps the most desirable way to keep the CFP current is to update it regularly so the six-year plan is a rolling CFP. Again, the State recommends that the CFP be updated at least biennially. The City of Auburn will seek to update the CFP at least biennially in conjunction with the budget process. Future updates will consider: A. Revision of population projections, including annexations; B. Update of inventory of public facilities; C. Update of costs of public facilities; D. Update of public facilities requirements analysis (actual level of service compared to adopted standards); E. Update of revenue forecasts; F. Revise and develop capital improvement projects for the next six fiscal years; and, G. Update analysis of financial capacity. Amendments to the CFP, including amendments to level of service standards, capital projects, and/or the financing plan sources of revenue are all actions that can keep the CFP current and relevant to City decision-making. 9 City of Auburn Capital Facilities Plan 10 City of Auburn Capital Facilities Plan CHAPTER 2 GOALS AND POLICIES This chapter identifies goals and policies specific to the City’s provision of capital facilities. Goal 1 Provide a variety of responses to the demands of growth on public facilities. Policy 1.1 Establish land use patterns that optimize the use of public facilities. Policy 1.2 Provide additional public facility capacity when existing facilities are used to their maximum level of efficiency (consistent with adopted standards for level of service). Policy 1.3 Encourage development where new public facilities can be provided in an efficient manner. Policy 1.4 Exempt the following from the concurrency management program: 1.4.1 Development vested by RCW 19.27.095, 58.17.033 or 58.17.170. 1.4.2 Development that creates no added impact on public facilities. 1.4.3 Expansions of existing development that were disclosed and tested for concurrency as part of the original application. Goal 2 Provide needed public facilities that are within the ability of the City to fund or within the City’s authority to require others to provide. Policy 2.1 Establish level of service standards that are achievable with the financing plan of this Capital Facilities Plan. Policy 2.2 Base the financing plan for public facilities on realistic estimates of current local revenues and external revenues that are reasonably anticipated to be received by the City. Policy 2.3 Match revenue sources to capital projects based on sound fiscal policies. 2.3.1 The City shall continue to fund utility costs through utility enterprise funds, based on user fees and grants. Public facilities included in utilities are sewer, solid waste, storm drainage, and water. 2.3.2 Where feasible pursue joint venture facility construction, construction timing, and other facility coordination measures for City provided facilities, as well as with school districts and other potential partners in developing public facilities. 2.3.3 The City shall continue to assist through direct participation, LIDs and payback agreements, where appropriate and financially feasible. Where funding is available, the City may participate in developer initiated facility extensions or improvements, but only to the extent that the improvements benefit the broader public interest, and are consistent with the policies of this Capital Facilities Plan. 11 City of Auburn Capital Facilities Plan Policy 2.4 If the projected funding is inadequate to finance needed public facilities and utilities based on adopted level of service standards and forecasted growth, the City will do one or more of the following to achieve a balance between available revenue and needed public facilities: 2.4.1 Lower the level of service standards; 2.4.2 Increase the amount of revenue from existing sources; 2.4.3 Adopt new sources of revenue; 2.4.4 Require developers to provide such facilities at their own expense; and/or 2.4.5 Amend the Land Use Element to reduce the need for additional public facilities. Policy 2.5 Both existing and future development will pay for the costs of needed capital improvements. 2.5.1 Ensure that existing development pays for capital improvements that reduce or eliminate existing deficiencies, and pays for some or all of the cost to replace obsolete or worn out facilities. Existing development may also pay a portion of the cost of capital improvements needed by future development. Existing development’s payments may take the form of user fees, charges for services, special assessments and taxes. 2.5.2 Ensure that future development pays a proportionate share of the cost of new facilities that it requires. Future development may also pay a portion of the cost to replace obsolete or worn-out facilities. Future development’s payments may take the form of voluntary contributions for the benefit of any public facility, impact fees, mitigation payments, capacity fees, dedications of land, provision of public facilities, and future payments of user’s fees, charges for services, special assessments and taxes. Policy 2.6 The City will determine the priority of public facility capital improvements using the following criteria as general guidelines. Any revenue source that cannot be used for the highest priority will be used beginning with the highest priority for which the revenue can legally be expended. 2.6.1 Projects that eliminate hazardous conditions. 2.6.2 Refurbishment of existing facilities that contribute to achieving or maintaining standards for adopted level of service. 2.6.3 New or expanded facilities that reduce or eliminate deficiencies in level of service for existing demand. 2.6.4 New or expanded facilities that provide the adopted level of service for new development and redevelopment during the next six fiscal years. 2.6.5 Capital improvements that significantly reduce the operating cost of providing a service or facility, or otherwise mitigate impacts of public facilities on future operating budgets. 12 City of Auburn Capital Facilities Plan 2.6.6 Capital improvements that contribute to stabilizing and developing the economy of the City. 2.6.7 Project priorities may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility are financially feasible prior to constructing the facility. Goal 3 Protect public health, environmental quality, and neighborhood stability and viability through the appropriate design and installation of public facilities. Policy 3.1 Promote conservation of energy, water and other natural resources in the location and design of public facilities. Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever combined sewers may be discovered. Policy 3.3 Practice efficient and environmentally responsible maintenance and operating procedures. Policy 3.4 The siting, design, construction and improvement of all public buildings shall be done in full compliance with the Americans with Disabilities Act (ADA). Policy 3.5 Promote economic and community stability and growth through strategic investments in public facilities and public private/partnerships. Goal 4 Make the Capital Facilities Plan consistent with other elements of the comprehensive plan, and - to the extent feasible - with other city, county, regional and state adopted plans. Policy 4.1 Ensure that the growth and development assumptions used in the Capital Facilities Plan are consistent with similar assumptions in other elements of the comprehensive plan. Policy 4.2 Coordinate with non-city providers of public facilities on a joint program for maintaining applicable level of service standards, concurrency requirements, funding and construction of public facilities. Goal 5 Provide public facilities that provide a sense of community that is inclusive of diverse populations. Policy 5.1 Contribute to community pride and foster a sense of community through provision of public facilities that create a community-gathering place for neighbors, family and friends. Policy 5.2 Through provision of public facilities, offer a broad range of activities promoting social interactions especially with new residents. Policy 5.3 Provide maximum flexibility and multiple uses through design of public facilities that are adaptable to changing interests. Policy 5.4 Provide a community center facility that is financially feasible, affordable for participants, and can generate revenue to offset a portion of the operating costs. 13 City of Auburn Capital Facilities Plan 14 City of Auburn Capital Facilities Plan CHAPTER 3 CAPITAL IMPROVEMENTS 1. INTRODUCTION This CFP includes City capital improvement projects and the financing plan to pay for those projects. It also contains the inventory of existing City facilities, and identifies level of service standards, where applicable. Each type of City public facility is presented in a separate subsection that follows a standard format. Throughout this section, tables of data are identified with abbreviations that correspond to the type of facility. For example, Table W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds to the name of the type of facility. 1. Narrative Summary This is an overview of the data, with sections devoted to Current Facilities, Level of Service, Capital Facilities Projects and Financing, and Impact on Future Operating Budgets. 2. Inventory of Facilities (Table X-1) This is a list of existing capital facilities, including the name, capacity (for reference to level of service), and location. This table also includes any proposed capital projects and the planned inventory total through December 31, 2027. 3. Capital Projects and Financing Plan (Table X-2, X-2A and X-2B) This list of capital improvements identifies existing deficiencies, identifies facilities needed for future growth, and identifies the need to repair or replace obsolete or worn out facilities through December 31, 2027. Each list shows the proposed financing plan followed by individual worksheets showing the project detail. 4. Impact on Future Operating Budgets (Table X-3) This is a list of capital projects and the forecasted impacts on the City’s future operating budgets (2023 – 2028). 15 City of Auburn Capital Facilities Plan 16 City of Auburn Capital Facilities Plan TRANSPORTATION Current Facilities Roadways: The City’s street system consists of a network of approximately 254 miles of arterials, collectors, local streets and alleys. Existing non-motorized facilities include a mix of trails, sidewalks, and both dedicated and shared bicycle facilities. Signals and ITS: The City’s transportation system also includes 96 traffic signals, a Traffic Control Center employing Intelligent Transportation Systems (ITS), which centrally directs the signals, 83 CCTV cameras, and various traffic beacons all communicating on a network of copper wire and fiber optic cable. The City also has two roundabouts. Transit: King County Metro Transit, Sound Transit and Pierce Transit serve the Auburn area. Auburn is currently served by six Metro, two Sound Transit, and one Pierce Transit bus route. In addition, Sound Transit “Sounder” commuter trains provide peak hour and midday service at the Auburn Station. The Sounder also provides special event service to selected sporting events. Park and ride facilities and the Auburn Station support bus and rail service. Level of Service (LOS) Washington's Growth Management Act (GMA) requires Level of Service (LOS) standards for both arterials and transit routes. The GMA requires that each jurisdiction's LOS standards be coordinated within the region and be supported by local ordinance, but the actual standards and the methods used are determined by each local jurisdiction. Under GMA, the focus is on the performance of the whole road system, not on individual intersections or roadways. LOS standards are a tool to help keep the transportation system in balance with the needs of forecast population growth and development. Table T-1a summarizes the LOS definitions. 17 City of Auburn Capital Facilities Plan Table T-1a Definition of Urban Street Level of Service (LOS) LOS A - describes primarily free flow operations at average travel speeds, usually about 90 percent of the free flow speed for the given street class. Vehicles are completely unimpeded in their ability to maneuver wit hin the traffic stream. Control delay at signalized intersections is minimal. LOS B - describes reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free flow speed for the street class. The ability to maneuver within the traffic stream is only slightly res t ricted, and stopped delays are not bothersome. LOS C - describes stable conditions; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may cont ribute to lower average travel speeds of about 50 percent of the free flow speed for the street class. LOS D - borders on a range in which small increases in flow may cause substantial increases in delay and decreases in travel speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these factors. Average travel speeds are about 40 percent of free flow speed. LOS E - is characterized by significant delays and average travel speeds of 33 percent or less of the free flow speed. Such operations are caused by a combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. LOS F - is characterized by urban street flow at extremely low speeds, typically one-third to one-fourth of the free flow speed. Intersection congestion is likely at critical signalized locations, with high delays, high volumes and extensive queuing. Source: 2010 Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington, D.C. 2010, page 10-5 A methodology and set of standards have been drafted for the City of Auburn Comprehensive Plan. The standards help determine concurrency (i.e., balance) between the transportation and land use elements of the City’s Comprehensive Plan, as required by the GMA. The City has four choices if it is determined that standards cannot be met. • Modify the land use plan, placing tighter controls on the amount and type of development to reduce traffic. • Construct additional transportation facilities to support increased travel demand from new development. • Implement Transportation Demand Management (TDM) measures to increase use of non- single occupant vehicle travel modes. • Relax the LOS standards; the City can lower its level of service standards to encourage further growth and minimize the need for additional transportation facilities. The transportation/land-use balance will be monitored through the City's Concurrency Management System as part of the State Environmental Policy Act (SEPA). Transportation concurrency will be evaluated for key facilities and on a system-wide basis. The City can then identify locations where standards are not anticipated to be met in the future and identify appropriate improvements. At the project level, the SEPA process will continue to guide the more specific planning and analysis efforts. 18 City of Auburn Capital Facilities Plan Level of Service Standards LOS standards can help identify where and when transportation improvements are needed, and when development or growth will affect system operations. LOS provides a standard below which a transportation facility or system is not considered adequate. LOS standards can also be used to evaluate the impact of proposed developments on the surrounding street system. They can assure that all developments are served by a safe, efficient and cost-effective street system. They can also be used to disclose impacts, identify remedial actions, and apportion costs between public and private sources. The LOS standards shown in Table T-1b apply to the facility’s location and its functional classification. A more detailed description of the level of service methodology is provided in the City of Auburn Comprehensive Transportation Plan (2021), Chapter 5, Policy LOS-02. Table T- 1b Draft Roadway Capacity/Congestion LOS Standards Roadway/Intersection Maximum V/C Ratio/LOS Arterial Corridor D* Signalized Intersection D Unsignalized Intersection D *Unless otherwise specified in Chapter 2 of the City of Auburn Comprehensive Transportation Plan, 2020 LOS standards are also the basis of an equitable traffic impact fee system, which require developments to pay a portion of the costs for capacity improvements to the transportation infrastructure. In 2001, the City implemented a traffic impact fee program. The purpose of the fee is to mitigate traffic impacts more equitably while making the costs of development more predictable to developers. In 2007, the City implemented an additional transportation impact fee to address the impacts of heavy truck usage on the City’s transportation system. Both fees are updated annually so that the fees are consistent with current project costs. Measuring Transportation System Performance The level of service for street segments or links is analyzed with two primary purposes in mind. First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate areas of congestion within a transportation network, leading to the development of a long-range transportation facilities plan. Second, arterial corridor LOS analysis can be used to assess concurrency or if facilities are meeting the LOS standards. The City of Auburn currently uses Highway Capacity Manual methodologies to calculate levels of service. For arterials LOS are based on average travel speeds along a defined corridor. 19 City of Auburn Capital Facilities Plan Table T-1c shows the 25 defined street corridors, LOS standards and most recent calculated LOS. TABLE T- 1c Auburn Corridor Level of Service – Existing 2014 Weekday PM Peak Hour LOS ID Corridor From To Standard*NB/EB SB/WB 1 Auburn Way N 15th St NE S 277th St E C C 2 Auburn Way N E Main St 15th St NE E D D 3 Auburn Way S E Main St M St SE F C D 4 Auburn Way S M St SE Academy Dr SE D B C 5 M St / Harvey Auburn Way N E Main St E D D 6 M St / Harvey E Main St Auburn Way S E D C 7 37th St NE / NW W Valley Hwy Auburn Way N E C C 8 15th St NE / NW W Valley Hwy Auburn Way N F**D D 9 Auburn Ave / A St 6th St SE E Valley Access Rd D B C 10 Main St West Valley Hwy R St D D D 11 15th St SW West Valley Hwy C St SW E D D 12 C St SW Ellingson Rd SR - 18 D B C 13 West Valley Hwy 37th St NE 15th St NE E B C 14 S 277th St Frontage Rd L St NE E C C 15 R St SE / Kersey Way Howard Rd Lake Tapps Pkwy D B B 16 Lake Tapps Pkwy East Valley Hwy Kersey Way SE D C C 17 A St NW / B St NW 3rd St NW S 277th St D C B 18 8th St NE / Lea Hill Rd Harvey Rd 124th Ave SE E C B 19 SE 312th St / 132nd Ave SE 124th Ave SE SR - 18 D B B 20 105th Pl SE / SE 320th St Lea Hill Rd 124th Ave SE D A C 21 Lakeland Hills Way SE Lake Tapps Pkwy A St SE E D C 22 29th St SE / Riverwalk Dr A St SE Auburn Way S D D C 23 3rd St SW / Cross St C St Auburn Way S F F E 24 41st St SE / Ellingson Rd A St SE C St SE F F F 25 West Valley Hwy 15th St NW 15th St SW E D E * **Total travel time in the eastbound direction cannot exceed 1,000 seconds for this corridor to meet the LOS Standards Corridor segments within Downtown Auburn may operate at LOS E in accordance with the Auburn Downtown Plan. All other arterial and collector corridors must operate at LOS D or better, unless otherwise indicated. 2014 LOS 20 City of Auburn Capital Facilities Plan Concurrency (Adequate Public Facilities) Concurrency involves matching public facilities and new development. The GMA extends concurrency to transportation facilities by requiring that new development be served by adequate roads and public transportation service, and that development is not permitted to cause these transportation facilities to operate below level of service standards that are adopted by local governments in their comprehensive plans. In compliance with the GMA, adequate transportation system facilities must be available within six years of the time of occupancy and use of new development. Capital Facilities Projects and Financing The City’s transportation facilities include projects totaling $72,652,280. Tables T-2, T-2A and T-2B show the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table T-3 shows, operating budget impacts of $74,000 are forecasted for transportation facilities during the six years 2023 – 2028. 21 City of Auburn Capital Facilities Plan TABLE T-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 26 Harvey Road & 8th Street NE Intersection Improvements Long-Term Debt 83,196 82,794 82,382 81,990 81,589 81,187 493,138 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 83,196 82,794 82,382 81,990 81,589 81,187 493,138 27 Lea Hill Road/112th Ave SE Roundabout Capital Costs - - 350,000 420,000 2,200,000 2,200,000 5,170,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- - - - 1,600,000 1,100,000 2,700,000 Traffic Impact Fees - - 350,000 420,000 600,000 1,100,000 2,470,000 28 29th Street SE & R Street SE Intersection Improvements Capital Costs 525,000 250,000 4,000,000 - - - 4,775,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Street Preservation Fund 105 25,000 - 375,000 - - - 400,000 Other - - 125,000 - - - 125,000 Traffic Impact Fees 500,000 250,000 3,500,000 - - - 4,250,000 29 Lea Hill ITS Expansion Capital Costs - - 100,000 500,000 - - 600,000 Funding Sources: Unrestricted Street Revenue - - - - - - - REET2 - - 50,000 250,000 - - 300,000 Traffic Impact Fees - - 50,000 250,000 - - 300,000 30 R Street SE & 21st Street SE Intersection Safety Improvements Capital Costs - 250,000 100,000 750,000 - - 1,100,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- - - 600,000 - - 600,000 Traffic Impact Fees - 250,000 100,000 150,000 - - 500,000 31 Auburn Way S and 6th Street SE Capital Costs - 130,000 25,000 845,000 - - 1,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- - - 695,000 - - 695,000 Traffic Impact Fees - 130,000 25,000 150,000 - - 305,000 32 SE 304th Street/132nd Avenue SE Roundabout Capital Costs - 250,000 50,000 1,200,000 - - 1,500,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- - - - - - - Traffic Impact Fees - 250,000 50,000 1,200,000 - - 1,500,000 33 10th Street NW/A Street NW Intersection Improvements Capital Costs 250,000 750,000 - - - - 1,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Impact Fees 250,000 750,000 - - - - 1,000,000 34 Evergreen Heights Elementary Sidewalks Capital Costs - - - - 150,000 1,800,000 1,950,000 Funding Sources: Unrestricted Street Revenue - - - - - 160,000 160,000 Grants (Unsecured)- - - - 120,000 1,440,000 1,560,000 REET2 - - - - 30,000 200,000 230,000 35 Riverwalk Drive SE Non-Motorized Improvements Capital Costs 175,000 1,050,000 - - - - 1,225,000 Funding Sources: Unrestricted Street Revenue 50,000 262,500 - - - - 312,500 Grants 125,000 455,000 - - - - 580,000 Other -MIT - 332,500 - - - - 332,500 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION 22 City of Auburn Capital Facilities Plan TABLE T-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 36 Stewart Road - Sumner (Lake Tapps Parkway Corridor) Capital Costs - - 150,000 - - - 150,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Mitigation Fees - - 150,000 - - - 150,000 37 M Street Underpass (3rd St SE to 8th St SE) Long-Term Debt 122,843 122,550 122,258 121,965 121,673 121,380 732,669 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- - - - - - - Traffic Impact Fees 122,843 122,550 122,258 121,965 121,673 121,380 732,669 38 A Street Loop Capital Costs 340,000 1,192,000 - - - - 1,532,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants (Unsecured)- 1,125,000 - - - - 1,125,000 Traffic Impact Fees - 67,000 - - - - 67,000 Other 340,000 - - - - - 340,000 39 A Street NW, Phase 2 (W Main St to 3rd St NW) Capital Costs - - 350,000 2,650,000 - - 3,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Impact Fees - - 150,000 - - - 150,000 Grants (Unsecured)- - 200,000 1,325,000 - - 1,525,000 Other (Other Agencies)- - - 1,325,000 - - 1,325,000 40 Auburn Way S Improvements (Hemlock St SE to Poplar St SE) Capital Costs 1,143,888 400,000 4,000,000 3,000,000 - - 8,543,888 Funding Sources: Unrestricted Street Revenue - - 200,000 - - - 200,000 Traffic Impact Fees 846,338 400,000 1,738,153 1,453,615 - - 4,438,106 Grants 297,550 - 2,061,847 1,546,385 - - 3,905,782 Other (Other Agencies)- - - - - - - 41 M Street NE (E Main St to 4th St NE) Capital Costs 375,000 50,000 2,485,000 - - - 2,910,000 Funding Sources: Unrestricted Street Revenue 120,000 50,000 400,000 - - - 570,000 Arterial Street Fund 105 185,000 - 1,220,000 - - - 1,405,000 REET 2 - - 400,000 - - - 400,000 Traffic Impact Fees 70,000 - 465,000 - - - 535,000 Other - - - - - - - 42 49th Street NE (Auburn Way N to D St NE) Capital Costs 500,000 1,500,000 - - - - 2,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Other 500,000 1,500,000 - - - - 2,000,000 43 46th Place S Realignment Capital Costs - - - 250,000 250,000 750,000 1,250,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees - - - 250,000 250,000 750,000 1,250,000 44 124th Ave SE Corridor Improvements Phase 2 Capital Costs - - - - 400,000 1,100,000 1,500,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees - - - - 400,000 1,100,000 1,500,000 23 City of Auburn Capital Facilities Plan TABLE T-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 45 Regional Growth Center Access Improvements Capital Costs 100,000 1,500,000 - - - - 1,600,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - 1,300,000 - - - - 1,300,000 Traffic Impact Fees 100,000 200,000 - - - - 300,000 46 Stewart Road - City of Pacific (Lake Tapps Parkway Corridor) Capital Costs 100,000 - - - - - 100,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Mitigation Fees 100,000 - - - - - 100,000 47 East Valley Highway Widening Capital Costs - - - - 300,000 250,000 550,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 200,000 175,000 375,000 Traffic Impact Fees - - - - 100,000 75,000 175,000 48 Garden Avenue Realignment Capital Costs 500,000 - - - - - 500,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 500,000 - - - - - 500,000 49 A Street NW - Phase 1 (3rd St NW to 14th St NW) Capital Costs 25,000 - - - - - 25,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 25,000 - - - - - 25,000 50 S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements Capital Costs 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Impact Fees 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Other - - - - - - - Subtotal, Capacity Projects: Capital Costs 4,239,927 7,527,344 11,814,640 9,818,955 3,503,262 6,302,567 43,206,695 Non-Capacity Projects: 51 Auburn Way N/1st Street NE Signal Replacement Capital Costs 105,935 - - - - - 105,935 Funding Sources: Unrestricted Street Revenue 85,935 - - - - - 85,935 Arterial Street Preservation 20,000 - - - - - 20,000 52 ITS Dynamic Message Signs Capital Costs - - - - 35,000 225,000 260,000 Funding Sources: Unrestricted Street Revenue - - - - 35,000 225,000 260,000 Grants - - - - - - - 24 City of Auburn Capital Facilities Plan TABLE T-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 53 Auburn Avenue/E Main Street Signal Replacement Capital Costs - - - - 200,000 900,000 1,100,000 Funding Sources: Unrestricted Street Revenue - - - - - - - REET 2 - - - - 200,000 900,000 1,100,000 54 Citywide Pedestrian Accessibility & Safety Program Capital Costs 150,000 150,000 150,000 150,000 150,000 150,000 900,000 Funding Sources: Unrestricted Street Revenue 150,000 150,000 150,000 150,000 150,000 150,000 900,000 Other - - - - - - - 55 Auburn Station Access Improvements Capital Costs 125,000 - - - - - 125,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Other (Sound Transit)125,000 - - - - - 125,000 56 M Street SE Sidewalk Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants (Unsecured)- - - - - - - Other - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 405,935 170,000 170,000 170,000 405,000 1,295,000 2,615,935 2022 2023 2024 2025 2026 2027 Total SUMMARY: CAPITAL COSTS Capacity Projects 4,033,888 7,322,000 11,610,000 9,615,000 3,300,000 6,100,000 41,980,888 Non-Capacity Projects 405,935 170,000 170,000 170,000 405,000 1,295,000 2,615,935 Long-Term Debt 206,039 205,344 204,640 203,955 203,262 202,567 1,225,807 Total Costs 4,645,862 7,697,344 11,984,640 9,988,955 3,908,262 7,597,567 45,822,630 FUNDING SOURCES: Unrestricted Street Revenue 410,935 462,500 750,000 150,000 185,000 535,000 2,493,435 Grants 447,550 2,880,000 2,636,847 4,166,385 2,120,000 3,615,000 15,865,782 Traffic Impact Fees 2,517,377 2,522,344 6,652,793 4,097,570 1,573,262 3,247,567 20,610,913 Traffic Mitigation Fees 100,000 - 150,000 - - - 250,000 Street Preservation Fund 105 205,000 - 1,220,000 - - - 1,425,000 REET - - 450,000 250,000 30,000 200,000 930,000 Other (Other Agencies, Funds)965,000 1,832,500 125,000 1,325,000 - - 4,247,500 Total Funding 4,645,862 7,697,344 11,984,640 9,988,955 3,908,262 7,597,567 45,822,630 25 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Harvey Rd NE/8th St NE Intersection Improvements TIP# I-5 Project No:cp0611 Project Type:Capacity Project Manager:None LOS Corridor ID# 5, 19 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)945,178 83,598 83,196 82,794 1,111,972 Traffic Impact Fees 204,500 204,500 PWTF 1,527,300 1,527,300 2,676,978 83,598 83,196 82,794 2,843,772 Capital Expenditures: Design 327,500 - - - 327,500 Right of Way 200,400 - - - 200,400 Construction 1,203,900 - - - 1,203,900 Long Term Debt - PWTF 945,178 83,598 83,196 82,794 1,111,972 2,676,978 83,598 83,196 82,794 2,843,772 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)82,382 81,990 81,589 81,187 493,138 Traffic Impact Fees - - - - - PWTF - - - - - 82,382 81,990 81,589 81,187 493,138 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - Long Term Debt - PWTF 82,382 81,990 81,589 81,187 493,138 82,382 81,990 81,589 81,187 493,138 Grants / Other Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: Description: The project constructed one eastbound through/right turn-lane on 8th St NE to the west of Harvey Rd and modified traffic signals and traffic channelization to accommodate the new lane. The additional lane reduced traffic delays and queuing at the intersection of Harvey Rd and 8th St NE in all directions. This project also reconstructed M St NE from 4th St NE to 8th St NE, a segment of roadway approximately 0.3 miles long with a four-lane cross-section. The reconstruction addressed the existing poor pavement condition and completed sidewalk gaps. . Progress Summary: Project was completed in 2010. Ongoing budget is for Public Works Trust Fund Loan debt payments scheduled through 2028. Future Impact on Operating Budget: N/A Total Funding Sources: Total Funding Sources: 26 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Lea Hill Road/112th Ave SE Roundabout TIP# I-6 Project No:cpxxxx Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# 19 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - 1,600,000 1,100,000 2,700,000 Traffic Impact Fees 350,000 420,000 600,000 1,100,000 2,470,000 Other - - - - - 350,000 420,000 2,200,000 2,200,000 5,170,000 Capital Expenditures: Design 350,000 - - - 350,000 Right of Way - 420,000 - - 420,000 Construction - - 2,200,000 2,200,000 4,400,000 350,000 420,000 2,200,000 2,200,000 5,170,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: The project will construct a single-lane roundabout at the 112th Avenue SE intersection with Lea Hill Road. The intersection is currently stop-controlled on the 112th Avenue SE approach. The project will also implement turn restrictions at the Lea Hill Road intersection with 105th Place SE, and remove the existing span wire traffic signal. The project will improve traffic operations, safety and non-motorized access. Progress Summary: The Lea Hill Road Corridor study was completed during 2020. This project is based on the study recommendations. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. 27 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 29th St SE/R St SE Intersection Improvements TIP# I-8 Project No:cp2116 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 16, 27 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - 750,000 500,000 250,000 1,250,000 Street Preservation Fund 105 - 75,000 25,000 - 100,000 Other (Icon)- - - - - - 825,000 525,000 250,000 1,350,000 Capital Expenditures: Design - 825,000 275,000 - - Right of Way - - 250,000 250,000 250,000 Construction - - - - - - 825,000 525,000 250,000 1,350,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees 3,500,000 - - - 4,250,000 Street Preservation Fund 105 375,000 - - - 400,000 Other (Icon)125,000 - - - 125,000 4,000,000 - - - 4,775,000 Capital Expenditures: Design - - - - 275,000 Right of Way - - - - 500,000 Construction 4,000,000 - - - 4,000,000 4,000,000 - - - 4,775,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project will construct a second southbound through lane between 22nd Street SE and 33rd Street SE and a new signal at the 29th Street SE intersection. The improvements are needed to address the existing LOS deficiency at this intersection during the weekday PM peak hour. Progress Summary: The R Street Corridor study was completed during 2020. This project is based on the study recommendations. Future Impact on Operating Budget: The additional annual maintenance cost for this project is estimated to be $500. Replacing the traffic signal will reduce on- going maintenance costs to replace parts and equipment that have reached the end of their service life. 28 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Lea Hill ITS Expansion TIP# I-9 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 16 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees 50,000 250,000 - - 300,000 REET2 50,000 250,000 - - 300,000 Other - - - - - 100,000 500,000 - - 600,000 Capital Expenditures: Design 100,000 - - - 100,000 Right of Way - - - - - Construction - 500,000 - - 500,000 100,000 500,000 - - 600,000 Grants / Other Sources: Total Expenditures: Description: This project will extend new City of Auburn fiber east along SE 304th St from 124th Ave SE to 132nd Ave SE and connect to the signal with SE 304th St. This will support communication to School zone beacons on both SE 304th SE and 132nd Ave SE, one traffic signal, one battery backup, and ITS cameras. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $ 500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 29 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: R Street SE & 21st Street SE Intersection Safety Improvements TIP# I-10 Project No:CP1918 Project Type:Capacity, Safety Project Manager:James Webb LOS Corridor ID# 16 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - 250,000 - REET2 - - - - - Other - - - - - - - - 250,000 - Capital Expenditures: Design - - - 250,000 - Right of Way - - - - - Construction - - - - - - - - 250,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - 600,000 - - 600,000 Traffic Impact Fees 100,000 150,000 - - 500,000 REET2 - - - - - Other - - - - - 100,000 750,000 - - 1,100,000 Capital Expenditures: Design - - - - 250,000 Right of Way 100,000 - - - 100,000 Construction - 750,000 - - 750,000 100,000 750,000 - - 1,100,000 Grants / Other Sources: Total Expenditures: Description: The project will construct a single lane roundabout in place of the existing east/west stop-control on 21st Street SE. The project is needed to address an existing LOS deficiency, and will improve safety at the intersection. Progress Summary: This improvement was recommended in the R Street Corridor study which was completed during 2020. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 30 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Auburn Way S and 6th Street SE TIP# I-11 Project No:cpxxx Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# 3 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - 130,000 - Other - - - - - - - - 130,000 - Capital Expenditures: Design - - - 130,000 - Right of Way - - - - - Construction - - - - - - - - 130,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - 695,000 - - 695,000 Traffic Impact Fees 25,000 150,000 - - 305,000 Other - - - - - 25,000 845,000 - - 1,000,000 Capital Expenditures: Design - - - - 130,000 Right of Way 25,000 - - - 25,000 Construction - 845,000 - - 845,000 25,000 845,000 - - 1,000,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: The project will construct a dedicated southbound right-turn pocket on Auburn Way S at 6th Street SE and other improvements to support the new right-turn pocket. The project will address an existing level of service deficiency at the intersection, improving access from SR-18 to A Street SE. Progress Summary: Federal grant funding for construction is proposed to be applied for in 2022. If awarded construction would occur in 2025. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. 31 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: SE 304th Street/132nd Avenue SE Roundabout TIP# I-13 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23, 25 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - 250,000 - Other - - - - - - - - 250,000 - Capital Expenditures: Design - - - 250,000 - Right of Way - - - - - Construction - - - - - - - - 250,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees 50,000 1,200,000 - - 1,500,000 Other - - - - - 50,000 1,200,000 - - 1,500,000 Capital Expenditures: Design - - - - 250,000 Right of Way 50,000 - - - 50,000 Construction - 1,200,000 - - 1,200,000 50,000 1,200,000 - - 1,500,000 Grants / Other Sources: Description: The project will construct a single-lane roundabout at the SE 304th Street intersection with 132nd Avenue SE on Lea Hill. The roundabout will replace the existing stop-controlled on the SE 304th Street approach. The project is needed to address a level of service deficiency at the intersection. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 32 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 10th Street NW/A Street NW Intersection Improvements TIP# I-15 Project No:asbd36 Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - 250,000 750,000 250,000 REET2 - - - - - Other - - - - - - - 250,000 750,000 250,000 Capital Expenditures: Design - - 250,000 - 250,000 Right of Way - - - - - Construction - - - 750,000 - - - 250,000 750,000 250,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - Traffic Impact Fees - - - - 1,000,000 REET2 - - - - - Other - - - - - - - - - 1,000,000 Capital Expenditures: Design - - - - 250,000 Right of Way - - - - - Construction - - - - 750,000 - - - - 1,000,000 Grants / Other Sources: Total Expenditures: Description: The project will construct a new traffic signal in place of the existing stop-control on the 10th Street NW approach. The project is needed to address a level of service deficiency at the intersection. The project will also evaluate intersection control, channelization, and pedestrian crossing improvements along 10th Street NW to the east of the intersection. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 33 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Evergreen Heights Elementary Sidewalks TIP# N-8 Project No:asbd14, cp1810 Project Type:Capacity, Non-Motorized Project Manager:Jacob Sweeting LOS Corridor ID# 37 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 24,500 - - - 24,500 Grants- Unsecured - - - - - Traffic Mitigation Fees 100,000 - - - 100,000 Other (Auburn Sch. Dist.)122,500 - - - 122,500 REET 2 - - - - - 247,000 - - - 247,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 247,000 - - - 247,000 247,000 - - - 247,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - 160,000 160,000 Grants- Unsecured - - 120,000 1,440,000 1,560,000 Traffic Mitigation Fees - - - - - Other (Auburn Sch. Dist.)- - - - - REET 2 - - 30,000 200,000 230,000 - - 150,000 1,800,000 1,950,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - - - - - Construction - - - 1,800,000 1,800,000 - - 150,000 1,800,000 1,950,000 Grants / Other Sources: Auburn School District partnership includes direct financial contribution and ROW dedication. Description: The project will construct a new sidewalk along the north side of S 316th Street between the end of the existing sidewalk at 56th Avenue S and 51st Avenue S to the west (approximately 1,250 feet). The project will also construct curb and gutter, storm improvements, and street lighting. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 34 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Riverwalk Drive SE Non-Motorized Improvements TIP# N-9 Project No:cp2121 Project Type:Capacity, Non-Motorized Project Manager:Jeff Bender LOS Corridor ID# 27 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - 20,000 50,000 262,500 70,000 Secured Grant - 55,000 125,000 455,000 180,000 Traffic Impact Fees - - - - - REET2 - - - - - Other (MIT)- - - 332,500 - - 75,000 175,000 1,050,000 250,000 Capital Expenditures: Design - 75,000 175,000 - 250,000 Right of Way - - - - - Construction - - - 1,050,000 - - 75,000 175,000 1,050,000 250,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - 312,500 Secured Grant - - - - 580,000 Traffic Impact Fees - - - - - REET2 - - - - - Other (MIT)- - - - 332,500 - - - - 1,225,000 Capital Expenditures: Design - - - - 175,000 Right of Way - - - - - Construction - - - - 1,050,000 - - - - 1,225,000 Grants / Other Sources: Total Expenditures: Description: The project will construct sidewalks, street lighting, and related storm improvements along the east side of Riverwalk Drive SE between Auburn Way S and Howard Road SE. This project will close a major gap in the sidewalk system and ties into the proposed improvements on Auburn Way South. The project will also install a RRFB at the intersection with Howard Road. The project is proposed to be in partnership with the Muckleshoot Indian Tribe. Progress Summary: Grant funding from WSDOT was awarded in 2021. The design phase will start in 2021 with construction of the improvements completed during 2023. The City and Muckleshoot Indian Tribe have entered into a memorandum of understanding for improvements along the Auburn Way S corridor, and are currently negotiating the funding agreement for this project. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 35 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Stewart Road - Sumner (Lake Tapps Parkway Corridor)TIP# R-2 Project No:N/A Project Type:Capacity Project Manager:City of Sumner LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees 150,000 - - - 150,000 150,000 - - - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 150,000 - - - 150,000 150,000 - - - 150,000 Grants / Other Sources: Total Expenditures: Description: This is a City of Sumner project to widen the Stewart Road (Lake Tapps Parkway) Corridor. The project will replace the existing bridge over the White River with a new wider one. Completion of this corridor widening is expected to significantly relieve traffic congestion in Auburn along the A St SE and C St SW corridors. Progress Summary: City of Sumner has initiated preliminary road design and is seeking grant funding to complete the project. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 36 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: M Street Underpass (3rd St SE to 8th St SE) TIP# R-3 Project No:c201a0 Project Type:Capacity Project Manager:Ryan Vondrak LOS Corridor ID# 6 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - Grants- Secured (Fed,State,Local)9,731,904 - - - 9,731,904 REET2 1,140,000 - - - 1,140,000 Traffic Impact Fees (Construction)4,309,782 - - - 4,309,782 Traffic Impact Fees (Debt Service)890,856 123,135 122,843 122,550 1,136,834 Traffic Mitigation Fees 660,000 - - - 660,000 PWTFL (30 years)3,284,857 - - - 3,284,857 Other Sources (Other Agencies)*3,090,514 - - - 3,090,514 23,107,913 123,135 122,843 122,550 23,353,891 Capital Expenditures: Design 2,688,924 - - - 2,688,924 Right of Way 3,358,443 - - - 3,358,443 Construction 16,021,908 - - - 16,021,908 PWTFL Debt Service 890,856 123,135 122,843 122,550 1,136,834 22,960,131 123,135 122,843 122,550 23,206,109 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET2 - - - - - Traffic Impact Fees (Construction)- - - - - Traffic Impact Fees (Debt Service)122,258 121,965 121,673 121,380 732,669 Traffic Mitigation Fees - - - - - PWTFL (30 years)- - - - - Other Sources (Other Agencies)*- - - - - 122,258 121,965 121,673 121,380 732,669 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - PWTFL Debt Service 122,258 121,965 121,673 121,380 732,669 122,258 121,965 121,673 121,380 732,669 Description: Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks. Progress Summary: Construction was completed in 2014. The project is now in Public Works Trust Fund Loan (PWTFL) debt repayment through 2041. Future Impact on Operating Budget: N/A Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Grants / Other Sources: Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway 37 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: A Street Loop TIP# R-4 Project No:CP2117 Project Type:Capacity Project Manager:Luis Barba LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Secured Grant - - - 1,125,000 - Traffic Impact Fees - 470,000 - 67,000 470,000 Other (Sound Transit)- - 340,000 - 340,000 - 470,000 340,000 1,192,000 810,000 Capital Expenditures: Design - 300,000 - - 300,000 Right of Way - 170,000 67,000 - 237,000 Construction - - 273,000 1,192,000 273,000 - 470,000 340,000 1,192,000 810,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Secured Grant - - - - 1,125,000 Traffic Impact Fees - - - - 67,000 Other (Sound Transit)- - - 340,000 - - - - 1,532,000 Capital Expenditures: Design - - - - - Right of Way - - - - 67,000 Construction - - - - 1,465,000 - - - - 1,532,000 Grants / Other Sources:Interlocal funding from Sound Transit Description: The project will construct a new one-way (eastbound) roadway connection between A Street SW/S Division Street and A Street SE. The new intersection with A Street SE will allow an unsignalized right-turn movement onto southbound A Street SE, providing an alternative to the intersection of 3rd Street SE and A Street SE, which does not meet adopted LOS standards. The roadway will be constructed as a complete street to accommodate non-motorized road users. Progress Summary: Sound Transit has agreed to provide $340,000 towards the construction phase as mitigation for the second parking garage. Federal funding for the construction phase was awarded in 2021. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 38 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: A Street NW, Phase 2 (W Main St to 3rd St NW) TIP# R-5 Project No:cpxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 18 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - Unsecured Grant - - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other 150,000 - - - 150,000 150,000 - - - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 150,000 - - 150,000 150,000 - - - 150,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Unsecured Grant 200,000 1,325,000 - - 1,525,000 Traffic Impact Fees 150,000 - - - 150,000 REET2 - - - - - Other - 1,325,000 - 1,325,000 350,000 2,650,000 - - 3,000,000 Capital Expenditures: Design 250,000 - - - 250,000 Right of Way 100,000 - - - 100,000 Construction - 2,650,000 - - 2,650,000 350,000 2,650,000 - - 3,000,000 Grants / Other Sources: Total Expenditures: Description: The project will widen A Street NW to create a three-lane roadway section between W Main St and 3rd St NW. This project will improve the connection between the A St NW Extension, (Phase 1) and Auburn Station and Central Business District. This project could be partially or fully funded by development and/or Sound Transit's parking garage/access improvements. The project is approximately 0.2 miles long. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 39 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Auburn Way S Improvements (Hemlock St SE to Poplar St SE)TIP# R-6 Project No:cp1622 Project Type:Capacity Project Manager:Jeff Bender LOS Corridor ID# 4 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - Grants- Secured (Federal)131,305 865,000 297,550 - 1,293,855 Traffic Impact Fees 24,707 135,000 846,338 400,000 1,006,045 REET2 - - - - - Other - - - - - 156,012 1,000,000 1,143,888 400,000 2,299,900 Capital Expenditures: Design 156,012 1,000,000 343,988 - 1,500,000 Right of Way - - 800,000 400,000 800,000 Construction - - - - 156,012 1,000,000 1,143,988 400,000 2,300,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue 200,000 - - - 200,000 Grants- Secured (Federal)2,061,847 1,546,385 - - 3,905,782 Traffic Impact Fees 1,738,153 1,453,615 - - 4,438,106 REET2 - - - - - Other - - - - 4,000,000 3,000,000 - - 8,543,888 Capital Expenditures: Design - - - - 343,988 Right of Way - - - - 1,200,000 Construction 4,000,000 3,000,000 - - 7,000,000 4,000,000 3,000,000 - - 8,543,988 Grants / Other Sources: Total Expenditures: Description: The project will widen Auburn Way S between Hemlock St SE and Poplar St SE to accommodate two general purpose lanes in each direction, turn lanes, access management where feasible, U-turns, curb, gutter, sidewalk, illumination, transit stop improvements, a new traffic signal in the vicinity of Chinook Elementary School, Intelligent Transportation Systems, streetscape and storm improvements. The project length is approximately 0.4 miles. The project is needed to address traffic operations issues along the corridor. Progress Summary: Project scope was revised to omit portions of the original project scope that are being built by the Auburn School District's (ASD) Chinook Elementary replacement project. ASD's project will construct a roundabout at the school driveway on Auburn Way S instead of the traffic signal on Auburn Way S that was originally proposed as part of the City's project. $1,297,000 of federal grant funding for the design phase was awarded in 2019. 2021 Funding includes 2020 carry forward. If the cost of design phase is less than anticipated, a portion of the design phase grant will be utilized for construction. $3,605,807 of federal grant funding was awarded in 2022 for the construction phase. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 40 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: M Street NE (E Main St to 4th St NE) TIP# R-7 Project No:asbd12 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 5 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - 120,000 50,000 120,000 Arterial Street Fund (105)- - 185,000 - 185,000 REET 2 - - - - - Traffic Impact Fees - - 70,000 - 70,000 Other - - - - - - - 375,000 50,000 375,000 Capital Expenditures: Design - - 375,000 50,000 375,000 Right of Way - - - - - Construction - - - - - - - 375,000 50,000 375,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue 400,000 - - - 570,000 Arterial Street Fund (105)1,220,000 - - - 1,405,000 REET 2 400,000 - - - 400,000 Traffic Impact Fees 465,000 - - - 535,000 Other - - - - - 2,485,000 - - - 2,910,000 Capital Expenditures: Design - - - - 425,000 Right of Way - - - - - Construction 2,485,000 - - - 2,485,000 2,485,000 - - - 2,910,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project will construct a complete four/five-lane street section on M St NE from south of E Main St to 4th St NE, and reconstruct the signal at E Main St. The project is needed to improve traffic operations along the M Street NE corridor, and replace the existing pavement which is in poor condition. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. 41 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 49th Street NE (Auburn Way N to D St NE)TIP # R-8 Project No:asbd38 Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other Sources - Developer - - 500,000 1,500,000 500,000 - - 500,000 1,500,000 500,000 Capital Expenditures: Design - - 350,000 - 350,000 Right of Way - - 150,000 - 150,000 Construction - - - 1,500,000 - - - 500,000 1,500,000 500,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other Sources - Developer - - - - 2,000,000 - - - - 2,000,000 Capital Expenditures: Design - - - - 350,000 Right of Way - - - - 150,000 Construction - - - - 1,500,000 - - - - 2,000,000 Grants / Other Sources: Description: This project will construct the build-out of 49th Street NE between Auburn Way N and D Street NE. The improvements are funded by private development. Progress Summary: Preliminary design to identify the scope of the project and cost estimate is currently prepared by the developer. Once this has been approved by the City, the developer will provide the City with funding to complete the detailed design, ROW acquisition, and construction of the improvements. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: 42 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 46th Place S Realignment TIP# R-9 Project No:cpxxx Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured - - - - - REET 2 - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured - - REET 2 - - - - - Traffic Impact Fees - 250,000 250,000 750,000 1,250,000 Other Sources - - - - - - 250,000 250,000 750,000 1,250,000 Capital Expenditures: Design - 250,000 - 250,000 Right of Way - - 250,000 - 250,000 Construction - - - 750,000 750,000 - 250,000 250,000 750,000 1,250,000 Grants / Other Sources: Description: The project will realign 46th Place S to the south of S 321st Street. The realignment will move the 46th Place S intersection with S 321st Street approximately 350 feet to the east of the current location. This will create two T-intersections (44th Avenue S and 46th Place S) in place of the existing four-leg intersection. The existing 46th Place S will be dead-ended to the south of S 321st Street. The project will improve safety and traffic operations at the intersections. Progress Summary: A portion of the right-of-way for the realigned roadway was dedicated as part of an adjacent development project. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 43 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 124th Ave SE Widening (SE 312th St to SE 318th St)TIP# R-11 Project No:asbd01 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - - Traffic Impact Fees - - 400,000 1,100,000 1,500,000 Other - - - - - - - 400,000 1,100,000 1,500,000 Capital Expenditures: Design - - 400,000 - 400,000 Right of Way - - - 1,100,000 1,100,000 Construction - - - - - - - 400,000 1,100,000 1,500,000 Grants / Other Sources: Description: This project will widen 124th Avenue SE to create a four-lane section with bicycle and pedestrian facilities SE 318th St and SE 312th St. The project will also construct improvements at the SE 312th St/124th Ave SE intersection (including adding bike lanes, dual westbound left-turn lanes, dual southbound through-lanes, a northbound right-turn pocket, ITS improvements, and pedestrian safety improvements). The project is needed to improve traffic operations along the corridor and to accommodate all travel modes. Progress Summary: Phase 1 improvements between SE 318th and SE 316th were completed by GRC in 2012. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 44 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Regional Growth Center Access Improvements TIP# R-16 Project No:CP2110 Project Type:Capacity Project Manager:Seth Wickstrom LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured - 325,000 - 1,300,000 325,000 Traffic Impact Fees - 85,000 100,000 200,000 185,000 REET2 - - - - - Other - - - - - - 410,000 100,000 1,500,000 510,000 Capital Expenditures: Design - 410,000 - - 410,000 Right of Way - - 100,000 100,000 Construction - - - 1,500,000 - - 410,000 100,000 1,500,000 510,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured - - - 1,300,000 Traffic Impact Fees - - - 300,000 REET2 - - - - - Other - - - - - - - - - 1,600,000 Capital Expenditures: Design - - - - - Right of Way - - - - 100,000 Construction - - - 1,500,000 - - - - 1,600,000 Grants / Other Sources: Total Expenditures: Description: The project will construct a northbound left-turn lane and a northbound/southbound crosswalk at the 3rd Street NE/Auburn Avenue intersection, and realign the 4th Street NE/Auburn Way N intersection to eliminate the split phase signal operation improving circulation and access. The project will improve traffic operations, safety, and circulation for both vehicles and non- motorized users. Progress Summary: Grant funding for the design and construction phases was awarded from Sound Transit in 2019. The design phase of the project has been initiated, and is currently underway. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 45 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Stewart Road - City of Pacific (Lake Tapps Parkway Corridor)TIP# R-24 Project No:asbd25 Project Type:Capacity Project Manager:City of Pacific LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees - - 100,000 - 100,000 - - 100,000 - 100,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 100,000 - 100,000 - - 100,000 - 100,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees - - - - 100,000 - - - - 100,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 100,000 - - - - 100,000 Grants / Other Sources: Total Expenditures: Description: This is a City of Pacific project to widen the Stewart Road (Lake Tapps Parkway) Corridor. This is the final segment of widening in the City of Pacific which will tie in with the City of Sumner's planned final widening segment and new bridge over the White River. Completion of this corridor widening is expected to significantly relieve traffic congestion in Auburn along the A St SE and C St SW corridors. Progress Summary: City of Pacific is in the process of completing the design phase and environmental permitting for the project. Construction is currently planned for 2021/22. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 46 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: East Valley Highway Widening TIP # R-26 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Unsecured Grant - - - - - Traffic Impact Fees - - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Unsecured Grant - - 200,000 175,000 375,000 Traffic Impact Fees - - 100,000 75,000 175,000 - - - 300,000 250,000 550,000 Capital Expenditures: Design - - 300,000 - 300,000 Right of Way - - - 250,000 250,000 Construction - - - - - - - 300,000 250,000 550,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: This project will widen E Valley Highway between Lakeland Hills Way and Terrace View Drive SE, approximately 0.6 miles. The roadway will have a four/five lane cross section with a trail connection along the east side. Other project elements include storm improvement, illumination and ITS. The project will provide congestion relief along the corridor and provide access for non-motorized users. Progress Summary: The City is conducting a corridor study during 2021. The scope and cost estimate for this project will be revised based on the study recommendations. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. 47 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Garden Avenue Realignment TIP # R-27 Project No:cp2022 Project Type:Capacity Project Manager:Kim Truong LOS Corridor ID# 19 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees 8,200 291,800 500,000 - 800,000 8,200 291,800 500,000 - 800,000 Capital Expenditures: Design 8,200 141,800 - - 150,000 Right of Way - 150,000 - - 150,000 Construction - - 500,000 - 500,000 8,200 291,800 500,000 - 800,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 500,000 - - - - 500,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 500,000 - - - - 500,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: The project will construct a new east/west connection between Garden Avenue and 104th Avenue SE, and will cul-de-sac Garden Avenue to the north of 8th Street NE. This will improve traffic operations and safety along 8th Street NE. Progress Summary: The previous project title (Lea Hill Rd Segment 1A) was updated based on recommendations from the Lea Hill Corridor Study in 2020. In 2016, a parcel at the intersection of Garden Avenue and 320th/8th Street was purchased for the project. In 2016, right-of-way was dedicated for a portion of the new east/west roadway as part of an adjacent development project. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. 48 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: A Street NW - Phase 1 (3rd St NW to 14th St NW) TIP# S-1 Project No:c207a0 Project Type:Capacity, Environmental Monitoring Project Manager:Tim Carlaw LOS Corridor ID# 18 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 123,276 - - - 123,276 Grants- Secured (Fed,State)6,562,702 - - - 6,562,702 Traffic Impact Fees 1,292,607 25,000 25,000 - 1,342,607 Other Sources -Multicare Contribution 383,381 - - - 383,381 8,361,966 25,000 25,000 - 8,411,966 Capital Expenditures: Design 2,247,331 - - - 2,247,331 Right of Way 821,341 - - - 821,341 Construction 5,000,640 - - - 5,000,640 Environmental 292,654 25,000 25,000 - 342,654 8,361,966 25,000 25,000 - 8,411,966 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State)- - - - - Traffic Impact Fees - - - - 25,000 Other Sources -Multicare Contribution - - - - - - - - - 25,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - Environmental - - - - 25,000 - - - - 25,000 Grants / Other Sources: Description: The project constructed a new multi-lane arterial from 3rd Street NW to 14th Street NW completing a missing link along the corridor. This project improves mobility and was tied to corridor development. The project length was approximately three- quarters of a mile. The City purchased ROW from the northern property owner. If the property develops any access to A St NW, some or a portion of those funds may be reimbursed to the City (total cost was $251,000). Progress Summary: Pre-design was completed prior to 2007. Final design and environmental permitting were completed in 2011 and construction was completed in 2013. Major plantings are scheduled in 2015 as part of the wetland monitoring that is required to continue until 2023. Future Impact on Operating Budget: N/A Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 49 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements TIP# S-2 Project No:cp1821 Project Type:Capacity, Environmental Monitoring Project Manager:Tim Carlaw LOS Corridor ID# 15 Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured Federal - - - - - Grants- Secured State - - - - - Traffic Impact Fees 20,567 20,000 20,000 20,000 60,567 Other (Development Funds)*- - - - - Other - - - - - 20,567 20,000 20,000 20,000 60,567 Capital Expenditures: Design - - - - - Right of Way - - - - - Environmental 20,567 20,000 20,000 20,000 60,567 Construction - - - - - 20,567 20,000 20,000 20,000 60,567 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - - Traffic Impact Fees 20,000 20,000 20,000 20,000 120,000 Other (Development Funds)*- - - - - Other - - - - - 20,000 20,000 20,000 20,000 120,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Environmental 20,000 20,000 20,000 20,000 120,000 Construction - - - - - 20,000 20,000 20,000 20,000 120,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project will complete the environmental monitoring requirements related to the S 277th St corridor widening project between Auburn Way North and l St NE. Progress Summary: The 10 year monitoring period began in 2018 after final completion and continue through 2028. Future Impact on Operating Budget: N/A 50 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Auburn Way N/1st Street NE Signal Replacement TIP# I-1 Project No:CP1927 Project Type:Non-Capacity Project Manager:Matt Larson LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 88,690 773,410 85,935 - 948,035 Arterial Preservation Fund (105)- 205,000 20,000 - 225,000 Grants- Unsecured (Fed & State)- - - - - Traffic Impact Fees - - - - - Other Sources - - - - - 88,690 978,410 105,935 - 1,173,035 Capital Expenditures: Design 88,690 191,189 - - 279,879 Right of Way - - - - - Construction - 787,221 105,935 - 893,156 88,690 978,410 105,935 - 1,173,035 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - 85,935 Arterial Preservation Fund (105)- - - - Grants- Unsecured (Fed & State)- - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - 85,935 Capital Expenditures: Design - - - - Right of Way - - - - - Construction - - - 105,935 - - - - 105,935 Grants / Other Sources: Total Expenditures: Description: The project will replace the existing traffic signal at the Auburn Way N/1st Street NE signal. The signal was constructed in 1968 and is approaching the end of its service life. The project scope also includes the construction of ADA improvements, curb-bulbs, and storm improvements. Progress Summary: Future Impact on Operating Budget: Replacing the traffic signal will reduce on-going maintenance costs to replace parts and equipment that have reached the end of their service life. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 51 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: ITS Dynamic Message Signs TIP# I-3 Project No:asbd16, cp1701, cp1912 Project Type:Non-Capacity (ITS) Project Manager:Seth Wickstrom LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 162,797 237,201 - 399,998 Grants- Unsecured Federal - - - - - REET 100,000 - - - 100,000 PWTFL - - - - - Other (MIT)- - - - - 262,797 237,201 - - 499,998 Capital Expenditures: Design 136,025 - - - 136,025 Right of Way - - - - - Construction 126,772 237,201 - - 363,973 262,797 237,201 - - 499,998 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - 35,000 225,000 260,000 Grants- Unsecured Federal - - - - - REET - - - - - PWTFL - - - - - Other (MIT)- - - - - - - 35,000 225,000 260,000 Capital Expenditures: Design - - 35,000 - 35,000 Right of Way - - - - - Construction - - - 225,000 225,000 - - 35,000 225,000 260,000 Grants / Other Sources: Description: The program constructs Dynamic Message Signs at various locations throughout the City. Dynamic message signs are an important tool for communicating with roadway users in real time. Priority locations for sign placement are based on the Comprehensive Transportation Plans ITS map and include S. 277th, Auburn Way N, Auburn Way S, W Valley Highway, E Valley Highway, Lake Tapps Parkway, 15th St NW, and Lea Hill Rd. Progress Summary: The Auburn Way S and S 277th Street have been completed. The Lake Tapps Parkway and 15th Street NW signs are being constructed during 2021. Future Impact on Operating Budget: The annual maintenance and operational costs for this project is estimated to be $750 per sign. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 52 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Auburn Avenue/E Main Street Signal Replacement TIP# I-7 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed & State)- - - - - Traffic Impact Fees - - - - - REET 2 - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed & State)- - - - - Traffic Impact Fees - - - - - REET 2 - - 200,000 900,000 1,100,000 - - 200,000 900,000 1,100,000 Capital Expenditures: Design - 200,000 200,000 Right of Way - - - - - Construction - - 900,000 900,000 - - 200,000 900,000 1,100,000 Grants / Other Sources: Total Expenditures: Description: This program will replace the existing traffic signal at the Auburn Avenue/E Main Street signal, which was constructed in 1968. The project scope also includes the construction of ADA improvements. Progress Summary: Future Impact on Operating Budget: Replacing the traffic signal will reduce on-going maintenance costs to replace parts and equipment that have reached the end of their service life. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 53 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Non-Motorized Safety Program TIP# N-1 Project No:asbd08, cp1804, cp1902 Project Type:Non-Capacity (Annual) Project Manager:James Webb LOS Corridor ID# N/A Activity: Previous 2 Years 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 124,054 165,000 150,000 150,000 439,054 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other 179,596 - - - 179,596 303,650 165,000 150,000 150,000 618,650 Capital Expenditures: Design 94,867 33,000 30,000 30,000 157,867 Right of Way - - Construction 208,783 132,000 120,000 120,000 460,783 303,650 165,000 150,000 150,000 618,650 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue 150,000 150,000 150,000 150,000 900,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 150,000 150,000 150,000 150,000 900,000 Capital Expenditures: Design 30,000 30,000 30,000 30,000 180,000 Right of Way - Construction 120,000 120,000 120,000 120,000 720,000 150,000 150,000 150,000 150,000 900,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The program will construct non-motorized safety improvement projects at locations throughout the City. Projects are prioritized based on pedestrian and bicycle demands, existing deficiencies, field studies and community requests. Common improvements installed by this program include, but are not limited to, RRFBs, signage, striping, raised crosswalk, bicycle lanes, etc. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. 54 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Auburn Station Access Improvements TIP# N-6 Project No:TBD Project Type:Non-Capacity, Transit Project Manager:TBD LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other (King County Metro)- - 125,000 - 125,000 - - 125,000 - 125,000 Capital Expenditures: Design - - 25,000 - 25,000 Right of Way - - - - - Construction - - 100,000 - 100,000 - - 125,000 - 125,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other (King County Metro)- - - - 125,000 - - - - 125,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - - - - 100,000 - - - - 125,000 Grants / Other Sources: Total Expenditures: Description: The project will reconstruct the channelization and curb radii to improve the turning radius for transit vehicles at the northeast corner of A St SW/2nd St SW. Progress Summary: The ROW needed to accommodate this improvement was dedicated by the adjacent development project. King County Metro will complete the design and construction of the improvements as part of the RapidRide I Line project. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 55 City of Auburn Capital Facilities Plan ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: M Street SE Sidewalk Improvements TIP# N-10 Project No:CP2012 Project Type: Non-Capacity, Non-Motorized Project Manager:Luis Barba LOS Corridor ID# N/A Activity: 2021 YE 2022Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Street Revenue 33,664 366,336 5,000 - 405,000 Secured Grant 30,020 419,980 - - 450,000 Traffic Impact Fees - - - - - Other - - - - - 63,684 786,316 5,000 - 855,000 Capital Expenditures: Design 63,684 56,336 - - 120,020 Right of Way - - - - - Construction - 729,980 5,000 - 734,980 63,684 786,316 5,000 - 855,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Secured Grant - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Description: The project will construct sidewalks along the M Street SE corridor between Auburn Way S and 8th Street SE. The project will complete the missing sections of sidewalk along the west side of M Street SE between Auburn Way S and 8th Street SE, and will complete the missing segments of sidewalk along the east side between Auburn Way S and 12th Street SE. The project will construct approximately 2,000 linear feet of new sidewalk to match adjacent widths. The project will also construct ADA compliant curb ramps and relocate existing utility poles and overhead signage to provide ADA access. Progress Summary: Grant funding for the project was awarded by TIB in 2019. The design phase was initiated in 2020 and construction anticipated to be completed during 2021. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: 56 City of Auburn Capital Facilities Plan TABLE T - 2A 2022 2023 2024 2025 2026 2027 Total Capacity Projects: None - Page Non-Capacity Projects: 58 Local Street Improvement Program Capital Costs 1,650,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 11,650,000 Funding Sources: Fund Balance - 350,000 350,000 350,000 350,000 350,000 1,750,000 Transfer In (W/S/SWM Utility)150,000 150,000 150,000 150,000 150,000 150,000 900,000 To Be Determined - 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 Other REET 1 750,000 - - - - - 750,000 Other REET 2 750,000 - - - - - 750,000 59 2021 Local Street Preservation Project Capital Costs 10,000 - - - - - 10,000 Funding Sources: Fund Balance 10,000 - - - - - 10,000 Transfer In (W/S/SWM Utility)- - - - - - - Other REET 1 - - - - - - - Other REET 2 - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 1,660,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 11,660,000 Total Costs 1,660,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 11,660,000 FUNDING SOURCES: Fund Balance 10,000 350,000 350,000 350,000 350,000 350,000 1,760,000 Transfer In (W/S/SWM Utility)150,000 150,000 150,000 150,000 150,000 150,000 900,000 To Be Determined - 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 Other REET 1 750,000 - - - - - 750,000 Other REET 2 750,000 - - - - - 750,000 Total Funding 1,660,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 11,660,000 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING LOCAL STREET FUND 57 City of Auburn Capital Facilities Plan LOCAL STREET FUND (103)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: Local Street Improvement Program TIP# P-2 Project No:sobd02, cp1614, cp1717, cp1725, cp1726, cp1925 Project Type:Non-Capacity, Preservation Project Manager:James Webb LOS Corridor ID# N/A Activity: (Previous 2Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Local Street Fund - - - 350,000 - Transfer In (Utilities)300,000 - 150,000 150,000 450,000 Sales Tax on Construction - - - - - To Be Determined - - - 1,500,000 - REET 1 - - 750,000 - 750,000 REET 2 2,900,206 - 750,000 - 3,650,206 3,200,206 - 1,650,000 2,000,000 4,850,206 Capital Expenditures: Design 326,214 - 250,000 400,000 576,214 Right of Way - - - - - Construction 2,873,991 - 1,400,000 1,600,000 4,273,991 3,200,206 - 1,650,000 2,000,000 4,850,206 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Local Street Fund 350,000 350,000 350,000 350,000 1,750,000 Transfer In (Utilities)150,000 150,000 150,000 150,000 900,000 Sales Tax on Construction - - - - - To Be Determined 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 REET 1 - - - - 750,000 REET 2 - - - - 750,000 2,000,000 2,000,000 2,000,000 2,000,000 11,650,000 Capital Expenditures: Design 400,000 400,000 400,000 400,000 2,250,000 Right of Way - - - - - Construction 1,600,000 1,600,000 1,600,000 1,600,000 9,400,000 2,000,000 2,000,000 2,000,000 2,000,000 11,650,000 Grants / Other Sources: Description: This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on completing reconstruction needs in addition to regular maintenance treatments. The 2022 funds have been transferred into the Lead Service Line replacement project to cover the cost of additional reconstruction/rehabilitation included with the scope of that project. Progress Summary: This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on completing reconstruction needs in addition to regular maintenance treatments. The 2022 funds will be transferred into the Lead Service Line replacement project to cover the cost of additional reconstruction/rehabilitation included with the scope of that project. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: 58 City of Auburn Capital Facilities Plan LOCAL STREET FUND (103)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: 2021 Local Street Preservation Project TIP# P-7 Project No:cp2019 Project Type:Non-Capacity, Preservation Project Manager:Kim Truong LOS Corridor ID# N/A Activity: (Previous 2Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Local Street Fund 105,082 834,919 10,000 - 950,001 Transfer In (Utilities)- - - - - Sales Tax on Construction - - - - - REET 1 - 1,500,000 - - 1,500,000 REET 2 - 700,000 - - 700,000 105,082 3,034,919 10,000 - 3,150,001 Capital Expenditures: Design 105,082 237,000 - - 342,082 Right of Way - - - - - Construction - 2,797,919 10,000 - 2,807,919 105,082 3,034,919 10,000 - 3,150,001 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Local Street Fund - - - - 10,000 Transfer In (Utilities)- - - - - Sales Tax on Construction - - - - - REET 1 - - - - - REET 2 - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Description: This project will reconstruct G Street SE (from East Main Street to 4th Street SE) and grind and overlay the Riverwalk/Forest Ridge Neighborhood. The scope of work includes the following: full-depth roadway replacement and/or grind and overlay and any needed utility improvements within the project limits. Progress Summary: Project design underway in 2020. REET funds shown include $700k carry forward of 2020 funds from project CP1925 - 2020 Local Street Preservation Project and $1.5M of new REET funding in 2021. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: 59 City of Auburn Capital Facilities Plan TABLE T-2B 2022 2023 2024 2025 2026 2027 Total Capacity Projects: None - Page Non-Capacity Projects: 61 Arterial Street Preservation Program Capital Costs 600,000 600,000 150,000 1,133,870 2,050,000 2,200,000 6,733,870 Funding Sources: Fund Balance 600,000 600,000 150,000 1,133,870 2,050,000 2,200,000 6,733,870 REET 2 -Streets - - - - - - - Utility Tax - - - - - - - 62 2nd Street SE Preservation Capital Costs 175,000 - - - - - 175,000 Funding Sources: Fund Balance 70,000 - - - - - 70,000 Grants 105,000 - - - - - 105,000 Utility Tax - - - - - - - 63 Lake Tapps Pkwy/Sumner-Tapps Hwy E Preservation Capital Costs 25,000 75,000 1,284,356 - - - 1,384,356 Funding Sources: Fund Balance 25,000 75,000 534,356 - - - 634,356 Grants - - 750,000 - - - 750,000 64 Lea Hill Bridge Deck Preservation Capital Costs 10,000 - - - - - 10,000 Funding Sources: Fund Balance 10,000 - - - - - 10,000 Grants - - - - - - - 65 A St SE Preservation (37th Street SE to Lakeland Hills Way) Capital Costs - 25,000 100,000 1,732,260 - - 1,857,260 Funding Sources: Fund Balance - 25,000 100,000 866,130 - - 991,130 Grants - - - 866,130 - - 866,130 66 C Street SW Preservation (W Main St to GSA Signal) Capital Costs 100,000 2,236,544 - - - - 2,336,544 Funding Sources: Fund Balance 100,000 1,118,272 - - - - 1,218,272 Grants - 1,118,272 - - - - 1,118,272 67 3rd Street SW Bridges Deck Preservation Capital Costs 10,000 - - - - - 10,000 Funding Sources: Fund Balance 10,000 - - - - - 10,000 Grants - - - - - - - 68 4th Street SE Preservation (Auburn Way S to L Street SE) Capital Costs 2,662,620 - - - - - 2,662,620 Funding Sources: Fund Balance 1,065,048 - - - - - 1,065,048 Grants 1,597,572 - - - - - 1,597,572 Note: Financial plan utilizes the following order for use of funds to finance projects: grant revenues (if available), utility tax revenues and fund balance. CAPITAL FACILITIES PLAN PROJECTS AND FINANCING ARTERIAL STREET PRESERVATION FUND 60 City of Auburn Capital Facilities Plan 2022 2023 2024 2025 2026 2027 Total SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 3,582,620 2,936,544 1,534,356 2,866,130 2,050,000 2,200,000 15,169,650 Total Costs 3,582,620 2,936,544 1,534,356 2,866,130 2,050,000 2,200,000 15,169,650 FUNDING SOURCES: Fund Balance 1,880,048 1,818,272 784,356 2,000,000 2,050,000 2,200,000 10,732,676 Grants 1,702,572 1,118,272 750,000 866,130 - - 4,436,974 REET 2 -Streets - - - - - - - Total Funding 3,582,620 2,936,544 1,534,356 2,866,130 2,050,000 2,200,000 15,169,650 - - - - - - - 61 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: Arterial Street Preservation Program TIP# P-1 Project No:Varies annually, spbd01, cp1718, cp1725, cp1803, cp1829, cp1926 Project Type:Non-Capacity, Preservation Project Manager:Kenneth Clark LOS Corridor ID# N/A Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund 1,486,913 544,211 600,000 600,000 2,631,124 Utility Tax - - - - REET2 -Streets 446,279 - - - 446,279 Other -Development Fees 79,343 Grants -Federal 9,514 - - - 9,514 2,022,049 544,211 600,000 600,000 3,086,917 Capital Expenditures: Design 165,654 500 90,000 90,000 256,154 Right of Way - - - - - Construction 2,231,470 543,711 510,000 510,000 3,285,181 2,397,123 544,211 600,000 600,000 3,541,334 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund 150,000 1,133,870 2,050,000 2,200,000 6,733,870 Utility Tax - - - - - REET2 -Streets - - - - - Grants -Federal - - - - - 150,000 1,133,870 2,050,000 2,200,000 6,733,870 Capital Expenditures: Design 22,500 170,080 307,500 330,000 1,010,080 Right of Way - - - - - Construction 127,500 963,790 1,742,500 1,870,000 5,723,790 150,000 1,133,870 2,050,000 2,200,000 6,733,870 Grants / Other Sources: Description: The program preserves classified streets throughout the City. Individual projects may include a combination of crack seal, overlays, rebuilds, and spot repairs. The program also funds the biennial collection of pavement condition ratings. This program is funded through a 1% utility tax that was adopted by City Council in 2008. Program funds reflect remaining budget after allocations to specific arterial street preservation projects which are included as separate projects in this TIP. Progress Summary: During 2021, the Auburn Way N preservation projects and 15th Street NW reconstruction will be completed; the Lea Hill Road and 3rd Street SW bridge decks will be preserved; the reconstruction of 2nd Street SE will begin; 4th Street SE reconstruction is being designed; and arterial patching and crack seal projects are proposed. Future Impact on Operating Budget: This program is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: 62 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: 2nd Street SE Preservation TIP# P-3 Project No:CP2003 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund 45,219 278,281 70,000 - 393,500 Secured State Grant 35,223 450,027 105,000 - 590,250 Utility Tax - - - - - Bond proceeds - - - - - 80,442 728,308 175,000 - 983,750 Capital Expenditures: Design 80,442 34,558 - - 115,000 Right of Way - - - - - Construction - 693,750 175,000 - 868,750 80,442 728,308 175,000 - 983,750 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund - - - - 70,000 Secured State Grant - - - - 105,000 Utility Tax - - - - - Bond proceeds - - - - - - - - - 175,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 175,000 - - - - 175,000 Grants / Other Sources: Total Expenditures: Description: This project will reconstruct 2nd Street SE between A Street SE and Auburn Way S. The reconstruction will utilize full depth reclamation techniques. The project will also address fixed objects located within the clear zone, remove barriers to ADA access, and install new LED street lighting. Progress Summary: Grant funding for this project was awarded by TIB in 2019. The design phase started in 2020. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. 63 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: Lake Tapps Pkwy/Sumner-Tapps Hwy E Preservation TIP# P-6 Project No:spbd08 Project Type:Non-Capacity, Preservation Project Manager:TBD Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund - - 25,000 75,000 25,000 Unsecured Grant - - - - - Utility Tax - - - - - Bond proceeds - - - - - - - 25,000 75,000 25,000 Capital Expenditures: Design - - 25,000 50,000 25,000 Right of Way - - - 25,000 - Construction - - - - - - - 25,000 75,000 25,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund 534,356 - - 634,356 Unsecured Grant 750,000 - - 750,000 Utility Tax - - - - - Bond proceeds - - - - - 1,284,356 - - - 1,384,356 Capital Expenditures: Design - - - 75,000 Right of Way - - - 25,000 Construction 1,284,356 - - 1,284,356 1,284,356 - - - 1,384,356 Grants / Other Sources: Total Expenditures: Description: The project will grind and overlay the Lake Tapps Parkway/Sumner-Tapps Highway E corridor from the intersection of Lake Tapps Parkway with Lakeland Hills Way to the intersection of Sumner-Tapps Highway E with 16th Street E (the Auburn City limit). Portions of the corridor include a center two-way left-turn lane which does not require preservation and would be omitted from the grind and overlay. The project scope also includes upgrades to ADA curb ramps and pedestrian push buttons, and replacement of vehicle detection at signalized intersections. Progress Summary: Grant funding for the project was awarded in 2020. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 64 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: Lea Hill Bridge Deck Preservation TIP# P-9 Project No:CP2007 Project Type:Non-Capacity, Preservation Project Manager:Kim Truong Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund 2,882 37,118 10,000 - 50,000 Secured Federal Grant 4,858 922,992 - - 927,850 Utility Tax - - - - - Bond proceeds - - - - - 7,740 960,110 10,000 - 977,850 Capital Expenditures: Design 7,740 90,110 - - 97,850 Right of Way - - - - - Construction - 870,000 10,000 880,000 7,740 960,110 10,000 - 977,850 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund - - - - 10,000 Secured Federal Grant - - - - - Utility Tax - - - - - Bond proceeds - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Description: This project will grind and overlay the bridge deck in an effort to extend the overall service life of the bridge. Progress Summary: Grant funding was awarded in 2020. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 65 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: A St SE Preservation (37th Street SE to Lakeland Hills Way)TIP# P-10 Project No:spbd09 Project Type:Non-Capacity, Preservation Project Manager:TBD LOS Corridor ID# 10 Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund - - - 25,000 - Unsecured Grants - - - - - Utility Tax - - - - - Bond proceeds - - - - - - - - 25,000 - Capital Expenditures: Design - - - 25,000 - Right of Way - - - - - Construction - - - - - - - - 25,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund 100,000 866,130 - - 991,130 Unsecured Grants - 866,130 - - 866,130 Utility Tax - - - - - Bond proceeds - - - - - 100,000 1,732,260 - - 1,857,260 Capital Expenditures: Design 75,000 - - - 100,000 Right of Way 25,000 - - - 25,000 Construction - 1,732,260 - - 1,732,260 100,000 1,732,260 - - 1,857,260 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project will grind and overlay A Street SE from 37th Street SE to the Auburn/Pacific City Limit and from the Pacific/Auburn City Limit to the intersection with Lakeland Hills Way). The project also includes ADA upgrades to curb ramps, pedestrian push buttons, and replacement of vehicle detection loops. Progress Summary: Grant funding for the construction phase of this project is anticipated to be submitted in 2022. If awarded, the design phase would begin in 2023. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. 66 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Fund Project Title: C Street SW Preservation (W Main St to GSA Signal)TIP# P-11 Project No:cp2123 Project Type:Non-Capacity, Preservation Project Manager:TBD LOS Corridor ID# 13 Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund - 25,000 100,000 1,118,272 125,000 Secured Federal Grant - - - 1,118,272 - Utility Tax - - - - - Bond proceeds - - - - - - 25,000 100,000 2,236,544 125,000 Capital Expenditures: Design - 25,000 75,000 - 100,000 Right of Way - - 25,000 25,000 Construction - - - 2,236,544 - - 25,000 100,000 2,236,544 125,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund - - - 1,218,272 Secured Federal Grant - - - 1,118,272 Utility Tax - - - - Bond proceeds - - - - - - - - - 2,336,544 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - 25,000 Construction - - - 2,236,544 - - - - 2,336,544 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project will grind and overlay C Street SW from W Main Street to the GSA signal (approximately 2,000 feet to the south of 15th Street SW). The project also includes ADA upgrades to curb ramps and pedestrian push buttons, and replacement of vehicle detection loops. Progress Summary: Grant funding for the construction phase of this project was awarded in 2020. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. 67 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: 3rd Street SW Bridges Deck Preservation TIP# P-13 Project No:CP2006 Project Type:Non-Capacity, Preservation Project Manager:Kim Truong Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund 2,713 87,286 10,000 - 99,999 Secured Federal Grant 6,463 637,077 - - 643,540 Utility Tax - - - - - Bond proceeds - - - - - 9,176 724,363 10,000 - 743,539 Capital Expenditures: Design 9,176 97,286 - - 106,462 Right of Way - - - - - Construction - 627,077 10,000 - 637,077 9,176 724,363 10,000 - 743,539 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund - - - - 10,000 Secured Federal Grant - - - - - Utility Tax - - - - - Bond proceeds - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Description: This project will seal and overlay the 3rd Street SW bridge decks in an effort to extend the overall service life of the bridges. The following bridges are included in the project: 3rd Street off-ramp, 3rd Street SW over the BNSF tracks, and 3rd Street SW over A Street SW. Progress Summary: Grant funding was awarded in 2020. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 68 City of Auburn Capital Facilities Plan ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Special Revenue Funds Project Title: 4th Street SE Preservation (Auburn Way S to L Street SE)TIP# P-14 Project No:CP2102 Project Type:Preservation Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Arterial Preservation Fund 6,049 143,951 1,065,048 - 1,215,048 Secured State Grant - 150,000 1,597,572 - 1,747,572 Utility Tax - - - - - Other - - - - - 6,049 293,951 2,662,620 - 2,962,620 Capital Expenditures: Design 6,049 293,951 - - 300,000 Right of Way - - - - - Construction - - 2,662,620 - 2,662,620 6,049 293,951 2,662,620 - 2,962,620 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Arterial Preservation Fund - - - - 1,065,048 Secured State Grant - - - - 1,597,572 Utility Tax - - - - - Other - - - - - - - - - 2,662,620 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 2,662,620 - - - - 2,662,620 Grants / Other Sources: This project will replace pavement and utilities on 4th Street SE from Auburn Way South to L Street SE. A pavement grind and overlay is planned between Auburn Way South and D Street SE. Full depth pavement reclamation is planned from D Street SE to L Street SE. The project will also include replacement of City utilities, removal of sidewalk obstructions, replacement of sidewalk and curb ramps as needed to address ADA requirements, and other improvements. Progress Summary: Grant funding for the project was awarded by TIB in 2020. Future Impact on Operating Budget: This project is anticipated to reduce the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 69 City of Auburn Capital Facilities Plan TABLE T-3 Impact on Future Operating Budgets Transportation . Project:2023 2024 2025 2026 2027 2028 Total 1 Lea Hill Road/112th Ave SE Roundabout -$ -$ -$ -$ -$ 1,000$ 1,000$ 2 29th St SE & R St SE Intersection Imp.- - 500 500 500 500 2,000 3 Lea Hill ITS Expansion - - - 500 500 500 1,500 4 R St SE & 21st St SE Int. Safety Imp.- - - 1,000 1,000 1,000 3,000 5 Auburn Way S & 6th Street SE - - - 500 500 500 1,500 6 SE 304th Street/132nd Avenue SE Roundabout - - - 1,000 1,000 1,000 3,000 7 10th St NW & A St NW Intersection Imp.- 1,000 1,000 1,000 1,000 1,000 5,000 8 Riverwalk Dr SE Non-Motorized Imp.- 2,000 2,000 2,000 2,000 2,000 10,000 9 A Street Loop - 1,000 1,000 1,000 1,000 1,000 5,000 10 A Street NW, Phase 2 (W Main St to 3rd St NW)- - - 500 500 500 1,500 11 AWS Imp. -Hemlock St SE to Poplar St SE - - - 2,500 2,500 2,500 7,500 12 M Street NE, E. Main to 4th - - 500 500 500 500 2,000 13 49th Street NE (AWN to D St NE)- 500 500 500 500 500 2,500 14 46th Place S Realignment - - - - - 1,000 1,000 15 124th Ave SE Widening (SE 312th St to SE 318th St)- - - - - 1,000 1,000 16 Regional Growth Center Access Imp.- 500 500 500 500 500 2,500 17 Garden Garden Avenue Re-Alignment 1,000 1,000 1,000 1,000 1,000 1,000 6,000 18 ITS Dynamic Message Signs 3,000 3,000 3,000 3,000 3,000 3,000 18,000 Total 4,000$ 9,000$ 10,000$ 16,000$ 16,000$ 19,000$ 74,000$ 70 City of Auburn Capital Facilities Plan WATER Current Facilities The City of Auburn water utility provides water supply, treatment, transmission, storage, distribution, and service connections to in-City residences and businesses. The City also provides water to the City of Algona under a wholesale agreement. The water system consists of wells, springs and interties for source; chlorination stations and corrosion control for treatment; pump stations, pressure reducing stations and pipelines for transmission; and steel and concrete enclosed reservoirs for storage. Table W-1, “Facilities Inventory”, lists the facilities along with their current capacities and approximate locations. Level of Service (LOS) The City’s Comprehensive Water Plan summarizes the design criteria and service polices for the City’s water distribution system. Capital Facilities Projects and Financing The City of Auburn’s water system anticipates eight capacity projects in the amount of $17,274,823 and thirty non-capacity projects totaling $33,044,015 for a 6-year planning expectation total of $50,318,838. The financing plan is shown in Table W-2 followed by individual worksheets showing the project details. The capacity projects will increase water supply quantities, storage, and distribution for growth of retail customers. The non-capacity projects will provide for pipeline improvements and replacements, delivery pressure improvements, water quality enhancements, comprehensive and resource management planning, pump station upgrades, telemetry system improvements, and meter upgrades. Impact on Future Operating Budgets There are no operating budget impacts forecasted for the water facilities during the six years 2023-2028. 71 City of Auburn Capital Facilities Plan TABLE W-1 Facilities Inventory Water Facilities CAPACITY FACILITY WAT ER RIGHT (MGD - max rate)LOCATION Water Supply: Coal Creek Springs Certificate 857 9.70<2.52>*3401 Stuck River Rd Well 1 Certificate 3560-A 3.17 1136 M St SE Well 2 G1-00277 C 3.46 1109 5th St NE Well 3A G1-23629 C 4.03 401 37th St SE Well 3B (Included Above)(Included Above) 401 37th St SE Well 4 G1-20391 C 4.03 950 25th St SE Well 5 G1-23633 C 1.44 5530 James Ave SE Well 5B G1-25518C 0.24 5401 Olive Way SE Well 5A (Included Above)(Included Above) West end of 62nd Ct SE Well 6 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)1109 5th St NE Well 7 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)405 E St NE West Hill Springs Claim (1973 File Date)0.9 1900 15th St NW Ext Supply Total (MGD)26.97 Available for Use 24.45 * Denotes deduction of 1,750 gpm (Qi/2,824 ac-ft/yr) to comply with the provisions of the Muckleshoot-Auburn Stipulated Agreement. CAPACITY FACILITY (MGD)LOCATION SERVICE AREA Intertie Tacoma B Street NW 3.2 3240 B St NW Valley Service Area Tacoma 132nd Ave SE 3.2 29598 132nd Ave SE Lea Hill Service Area Intertie Total (MGD)6.4 CAPACITY FACILITY (MG)LOCATION SERVICE AREA Storage Facilities: Academy Reservoir 8A 1.2 5031 Auburn Way S Academy Service Area Academy Reservoir 8B 1.5 5031 Auburn Way S Academy Service Area Lakeland Hills Reservoir 5 1.0 1326 57th Dr SE Lakeland Hills Svc Area Lakeland Hills Reservoir 6 1.0 5718 Francis Ct SE Lakeland Hills Svc Area Lea Hill Reservoir 4A 1.0 30502 132nd Ave SE Lea Hill Service Area Lea Hill Reservoir 4B 1.5 30502 132nd Ave SE Lea Hill Service Area Valley Reservoir 1 5.0 2003 Auburn Way S Valley Service Area Valley Reservoir 2 3.6 32115 105th Place S Valley Service Area Storage Total (MG)15.8 CITY OF AUBURN WATER SYSTEM 72 City of Auburn Capital Facilities Plan TABLE W-1 (continued) Facilities Inventory Water Facilities CAPACITY FACILITY (GPM)LOCATION Booster Pump Stations: Academy 1: 2 pumps 800 2004 Auburn Way S Academy 2: 2 pumps 1,500 2004 Auburn Way S Academy East: 6 pumps 2,820 5031 Auburn Way S Green River: 4 pumps 4,680 29621 Green River Rd SE Intertie: 7 pumps 4,830 30502 132nd Ave SE Lakeland Hills: 5 pumps 3,200 1118 57th Place SE Lea Hill: 3 pumps 2,100 10406 Lea Hill Rd SE Terrace View: 3 pumps 1,500 6134 Alexander Place SE Wilderness Game Farm Pk: 2 pumps 1,050 2401 Stuck River Rd FACILITY LOCATION Pressure Reducing Stations: Serves Valley Pressure Zone: 25th Street SE #1110-10 25th St SE & K St SE B Street Intertie 3300 B St NW Green River Pump Station 29621 Green River Rd SE Howard Road CCF #1011-10 Howard Rd Howard Road CCF By-Pass #1011-20 Howard Rd (Bypass) Lea Hill Pump Station 10406 Lea Hill Rd SE Riverwalk # 1111-10 Riverwalk Dr SE & Howard Rd Riverwalk # 1111-20 2204 27th St. SE Serves Lea Hill: 132nd Avenue Intertie 132nd Ave SE & 295th St Amber View North #711-10 105th Pl SE & 320th Pl Amber View South #711-20 106th Pl SE Near Reservoir 2 Carriage Square Upper #611-30 Lea Hill Rd & 107 Pl Cobble Creek Lower #411-20 SE 304th Pl & SE 101st Place Cobble Creek Upper #411-10 104th Ave SE (South of 303rd Road) Lea Hill #412-10 SE 298th Place & 109 Ave SE Lea Hill #412-30 300 Block & 108th Ave SE Lea Hill #511-10 304th St. SE and 108th Ave SE Lea Hill #512-10 304th St. SE and 110th Pl SE Serves Academy: Academy Pump Station 2004 Auburn Way S Auburn Way South #1011-30 2003 Auburn Way S Auburn Way South #1114-10 4500 Auburn Way S Lemon Tree 5031 Auburn Way S 73 City of Auburn Capital Facilities Plan TABLE W-1 (continued) Facilities Inventory Water Facilities FACILITY LOCATION Serves Lakeland Hills: Lakeland Hills #1309-10 Mill Pond Dr @ Oravetz Rd Lakeland Hills #1310-10 Mill Pond Dr & Mill Pond Loop Lakeland Hills #1310-20 Kennedy Ave SE River Rock Lakeland Hills #1409-10 Oravetz & Lakeland Hills Way Lakeland Hills #1409-20 47th SE & Lakeland Hills Way Lakeland Hills #1409-30 Lakeland Hills Way & 51st St SE Lakeland Hills #1409-40 Mill Pond Dr & Lakeland Hills Way Lakeland Hills #1410-10 5018 Mill Pond Dr Lakeland Hills #1410-20 51st St. SE east of Mill Pond Loop Lakeland Hills #1410-30 Nathan Ave & Highland Dr Lakeland Hills #1410-40 5203 Quincy Ave SE Lakeland Hills #1411-10 Bennett Ave & 56th Ave SE Lakeland Hills #1411-20 5310 Bennett Ave SE Lakeland Hills #1411-30 5100 Kersey Way Lakeland Hills #1411-40 2305 54th St SE Lakeland Hills #1411-50 5253 Wesley Ave SE Lakeland Hills #1411-60 5233 Victoria Avenue Lakeland Hills #1412-10 5539 Franklin Ave SE Lakeland Hills #1412-20 Kersey Way SE School Lakeland Hills #1509-10 Terrace View Lower (6170) Lakeland Hills #1509-20 Terrace View Middle (5960) Lakeland Hills #1509-30 Terrace View Upper (5810) Lakeland Hills #1509-40 Terrace View & Alexander Place SE Lakeland Hills #1510-10 Lakeland Hills Way & Evergreen Way CAPACITY FACILITY (GPM)LOCATION Corrosion Control: Howard Road 5,550 2101 Howard Rd SE Fulmer Field 9,375 1113 5th St NE Chlorination Stations: Coal Creek Springs Station 5,000 (gravity feed) 3401 Stuck River Rd West Hill Springs Station 625 (gravity feed) 1900 15th St NW Well 1 2,200 1136 M St SE Well 4 2,600 950 25th St SE Well 5A 180 5401 Olive Ave SE Well 5B 600 1100 63rd St SE FACILITY CAPACITY LOCATION Water Supply: Braunwood Satellite 1 20 GPM 4501 47th St SE Storage Facilities: Braunwood Satellite 1 33,000 Gallons 4501 47th St SE Booster Pump Stations: Braunwood: 3 Pumps 2.0 GPM 4501 47th St SE BRAUNWOOD SATELLITE WATER SYSTEM 74 City of Auburn Capital Facilities Plan TABLE W-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 80 Cascade Water Alliance Water Purchase Capital Costs 934,810 934,810 934,810 934,810 934,810 934,810 5,608,860 Funding Sources: Water Fund 934,810 934,810 934,810 934,810 934,810 934,810 5,608,860 Bond Proceeds - - - - - - - 81 Academy Pump Station #1 Pump Replacement Capital Costs 609,500 - - - - - 609,500 Funding Sources: Water Fund 609,500 - - - - - 609,500 Bond Proceeds - - - - - - - 82 Coal Creek Springs Rehabilitation Capital Costs - - - - 1,125,509 2,873,424 3,998,933 Funding Sources: Water Fund - - - - 1,125,509 2,873,424 3,998,933 Bond Proceeds - - - - - - - 83 Algona Well 1 Decommissioning Capital Costs - 50,000 - - - - 50,000 Funding Sources: Water Fund - 50,000 - - - - 50,000 Bond Proceeds - - - - - - - 84 Annual Distribution System Improvements Program Capital Costs - - - 300,000 1,000,000 300,000 1,600,000 Funding Sources: Water Fund - - - 300,000 1,000,000 300,000 1,600,000 Bond Proceeds - - - - - - - 85 Howard Road CCTF Expansion Capital Costs - - - - 348,908 1,099,622 1,448,530 Funding Sources: Water Fund - - - - 348,908 1,099,622 1,448,530 Bond Proceeds - - - - - - - 86 Valley Service Area Reservoir No. 3 Capital Costs 50,000 - - - 700,000 510,000 1,260,000 Funding Sources: Water Fund 50,000 - - - 700,000 510,000 1,260,000 Bond Proceeds - - - - - - - 87 Well 5/5A Upgrades Capital Costs - - - 947,000 112,000 1,640,000 2,699,000 Funding Sources: Water Fund - - - 947,000 112,000 1,640,000 2,699,000 Bond Proceeds - - - - - - - Subtotal, Capacity Projects: Capital Costs 1,594,310 984,810 934,810 2,181,810 4,221,227 7,357,856 17,274,823 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING WATER DIVISION 75 City of Auburn Capital Facilities Plan 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 88 Well Inspection and Redevelopment Program Capital Costs - - - 200,000 - - 200,000 Funding Sources: Water Fund - - - 200,000 - - 200,000 Bond Proceeds - - - - - - - 89 Water Repair & Replacements Capital Costs 100,000 - 300,000 1,000,000 300,000 - 1,700,000 Funding Sources: Water Fund - - 300,000 1,000,000 300,000 - 1,600,000 Bond Proceeds 100,000 - - - - - 100,000 90 Street Utility Improvements Capital Costs 200,000 - 1,000,000 1,000,000 1,000,000 - 3,200,000 Funding Sources: Water Fund 200,000 - 1,000,000 1,000,000 1,000,000 - 3,200,000 Bond Proceeds - - - - - - - 91 Reservoir Seismic Rehabilitation Capital Costs - - 262,000 - 298,000 - 560,000 Funding Sources: Water Fund - - 262,000 - 298,000 - 560,000 Bond Proceeds - - - - - - - 92 Intertie Booster Pump Station Improvements Capital Costs - - - - 250,000 2,000,000 2,250,000 Funding Sources: Water Fund - - - - 250,000 2,000,000 2,250,000 Bond Proceeds - - - - - - - 93 Reservoir Painting Capital Costs - - - - 1,747,026 - 1,747,026 Funding Sources: Water Fund - - - - 1,747,026 - 1,747,026 Bond Proceeds - - - - - - - 94 Coal Creek Springs Transmission Main Replacement Capital Costs 3,700,000 - - - - - 3,700,000 Funding Sources: Water Fund - - - - - - - Grant - - - - - - - DWSRF Loan 3,700,000 - - - - - 3,700,000 Bond Proceeds - - - - - - - 95 4th Street SE Preservation Capital Costs 800,000 - - - - - 800,000 Funding Sources: Water Fund 700,000 - - - - - 700,000 Grant - - - - - - - Bond Proceeds 100,000 - - - - - 100,000 96 Reservoir Repair and Replacements Capital Costs 62,000 64,000 66,000 68,000 70,000 72,000 402,000 Funding Sources: Water Fund 62,000 64,000 66,000 68,000 70,000 72,000 402,000 Bond Proceeds - - - - - - - 97 R Street SE Improvements Capital Costs - 60,000 1,000,000 - - - 1,060,000 Funding Sources: Water Fund - 60,000 1,000,000 - - - 1,060,000 Bond Proceeds - - - - - - - 76 City of Auburn Capital Facilities Plan 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 98 2021 Local Street Reconstruction Capital Costs 10,000 - - - - - 10,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 10,000 - - - - - 10,000 99 Auburn Way Pavement Patching Capital Costs 100,000 - - - - - 100,000 Funding Sources: Water Fund 100,000 - - - - - 100,000 Bond Proceeds - - - - - - - 100 M Street NE Widening Capital Costs 37,000 - 320,000 - - - 357,000 Funding Sources: Water Fund 37,000 - 320,000 - - - 357,000 Bond Proceeds - - - - - - - 101 Auburn Way South - Hemlock Street SE to Poplar Street SE Capital Costs - 2,176,000 256,000 - - - 2,432,000 Funding Sources: Water Fund - 2,176,000 256,000 - - - 2,432,000 Bond Proceeds - - - - - - - 102 Water Trench Patches Program Capital Costs 155,000 160,000 165,000 170,000 175,000 180,000 1,005,000 Funding Sources: Water Fund 155,000 160,000 165,000 170,000 175,000 180,000 1,005,000 Bond Proceeds - - - - - - - 103 Lea Hill Pump Station Replacement Capital Costs - - - 491,000 746,333 5,300,000 6,537,333 Funding Sources: Water Fund - - - 491,000 746,333 5,300,000 6,537,333 Bond Proceeds - - - - - - - 104 Deduct Meter Replacement Program, Phases 1 through 3 Capital Costs 485,000 - - - - - 485,000 Funding Sources: Water Fund 100,000 - - - - - 100,000 Bond Proceeds 385,000 - - - - - 385,000 105 Comprehensive Water Plan Capital Costs 263,000 251,000 20,000 - - - 534,000 Funding Sources: Water Fund 263,000 251,000 20,000 - - - 534,000 Bond Proceeds - - - - - - - 106 Lea Hill AC Main Replacement Capital Costs 10,000 - - - - - 10,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 10,000 - - - - - 10,000 107 Reservoir 2 Valves Capital Costs 240,000 760,000 - - - - 1,000,000 Funding Sources: Water Fund 240,000 760,000 - - - - 1,000,000 Bond Proceeds - - - - - - - 77 City of Auburn Capital Facilities Plan 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 108 104th Park Development (104th to 102nd Water Main Loop) Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund 50,000 - - - - - 50,000 Bond Proceeds - - - - - - - 109 Garden Avenue Realignment Capital Costs 440,000 - - - - - 440,000 Funding Sources: Water Fund 440,000 - - - - - 440,000 Grants - - - - - - - 110 Lead Service Line Replacement Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund 50,000 - - - - - 50,000 Bond Proceeds - - - - - - - DWSRF Loan - - - - - - - 111 Well 4 Facility Improvements Capital Costs 1,015,000 - - - - - 1,015,000 Funding Sources: Water Fund 1,015,000 - - - - - 1,015,000 Bond Proceeds - - - - - - - 112 Water Resources Protection Program (Wellhead Protection) Capital Costs 27,700 28,500 29,400 30,200 31,200 33,100 180,100 Funding Sources: Water Fund 27,700 28,500 29,400 30,200 31,200 33,100 180,100 Bond Proceeds - - - - - - - 113 Game Farm Park Pump Station/Distribution System Improvements Capital Costs - - - - 69,782 329,774 399,556 Funding Sources: Water Fund - - - - 69,782 329,774 399,556 Bond Proceeds - - - - - - - 114 D Street SE Storm Improvements Capital Costs - 1,000,000 - - - - 1,000,000 Funding Sources: Water Fund - 1,000,000 - - - - 1,000,000 Bond Proceeds - - - - - - - 115 West Hill Springs Water Quality Improvements Capital Costs - - 100,000 480,000 - - 580,000 Funding Sources: Water Fund - - 100,000 480,000 - - 580,000 Bond Proceeds - - - - - - - 116 23rd Street SE Storm Improvements Capital Costs - 540,000 - - - - 540,000 Funding Sources: Water Fund - 540,000 - - - - 540,000 Bond Proceeds - - - - - - - 117 C St SW Preservation Capital Costs - 700,000 - - - - 700,000 Funding Sources: Water Fund - 700,000 - - - - 700,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 7,744,700 5,739,500 3,518,400 3,439,200 4,687,341 7,914,874 33,044,015 78 City of Auburn Capital Facilities Plan SUMMARY: 2022 2023 2024 2025 2026 2027 Total CAPITAL COSTS Capacity Projects 1,594,310 984,810 934,810 2,181,810 4,221,227 7,357,856 17,274,823 Non-Capacity Projects 7,744,700 5,739,500 3,518,400 3,439,200 4,687,341 7,914,874 33,044,015 Total Costs 9,339,010 6,724,310 4,453,210 5,621,010 8,908,568 15,272,730 50,318,838 FUNDING SOURCES: Water Fund 5,034,010 6,724,310 4,453,210 5,621,010 8,908,568 15,272,730 46,013,838 DWSRF Loan 3,700,000 - - - - - 3,700,000 Grants - - - - - - - Bond Proceeds 605,000 - - - - - 605,000 Total Funding 9,339,010 6,724,310 4,453,210 5,621,010 8,908,568 15,272,730 50,318,838 79 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Cascade Water Alliance Water Purchase Project No:cp1914 Project Type:Capacity Project Manager:Susan Fenhaus Description: Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue 1,187,391 934,805 934,810 934,810 3,057,006 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,187,391 934,805 934,810 934,810 3,057,006 Capital Expenditures: Water Supply Purchase 1,187,391 834,805 934,810 934,810 2,957,006 Right of Way - - - - - Construction - - - - - 1,187,391 834,805 934,810 934,810 2,957,006 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 934,810 934,810 934,810 934,810 5,608,860 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 934,810 934,810 934,810 934,810 5,608,860 Capital Expenditures: Water Supply Purchase 934,810 934,810 934,810 934,810 5,608,860 Right of Way - - - - - Construction - - - - - 934,810 934,810 934,810 934,810 5,608,860 Grants / Other Sources: Financing of System Development Charges for the right to purchase water from Tacoma Public Utilities through the Second Supply Pipeline to meet future projected demand, based on agreements with Cascade Water Alliance. Council approved the agreements for permanent and reserve wholesale supply in September 2013. A new agreement with Tacoma was executed in 2014. Budget reflects purchase of permanent supply - payments of $934,810 will continue from 2020 through 2029. Reserve supply will not be purchased and is not included. Comprehensive Plan project S-04. Progress Summary: Ongoing payments through 2029 Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: 80 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Academy Pump Station #1 Pump Replacement Project No:cp1916 Project Type:Capacity Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 609,500 - 609,500 Grants (Fed,State,Local)- - - - - Bond Proceeds 633,600 3,109,379 - - 3,742,979 Other - - - - - 633,600 3,109,379 609,500 - 4,352,479 Capital Expenditures: Design 633,600 32,248 - - 665,848 Right of Way - - - - - Construction - 3,077,131 609,500 - 3,686,631 633,600 3,109,379 609,500 - 4,352,479 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 609,500 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 609,500 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 609,500 - - - - 609,500 Grants / Other Sources: The pump station is reaching the end of its useful life. The project will construct a new pump station with 4 pumps to meet peak demands and fire flow requirements. Pump station #1 will be removed and pump station #2 will be used for storage after the pumps are removed. Preliminary design found it to be more cost effective to build a new pump station and decommission both existing pump stations. The backup power generator will be replaced. Comprehensive Plan project PS-07. Progress Summary: Construction underway in 2021. Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 81 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Coal Creek Springs Rehabilitation Project No:wabd07 Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 50,000 - - 50,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - 50,000 - - 50,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - - - - - - 50,000 - - 50,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 1,125,509 2,873,424 3,998,933 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - 1,125,509 2,873,424 3,998,933 Capital Expenditures: Design - - 500,000 - 500,000 Right of Way - - - - - Construction - - 625,509 2,873,424 3,498,933 - - 1,125,509 2,873,424 3,998,933 Grants / Other Sources: Rehabilitation of the Coal Creek Springs middle collector will improve capacity of the springs resulting in greater utilization of the water right. Comprehensive Plan project S-09. Progress Summary: Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 82 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Algona Well 1 Decommissioning Project No:wabd08 Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - 50,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 50,000 - Capital Expenditures: Design - - - 50,000 50,000 Right of Way - - - - - Construction - - - - - - - - 50,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - - - - - 50,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The Algona well has been temporarily abandoned and all related facilities removed. This project will have the well properly decommissioned by a State of Washington-licensed well driller, once the water rights have been transferred to an alternate source. Comprehensive Plan project S-14. Progress Summary: Future Impact on Operating Budget: No significant impact. 83 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Annual Distribution System Improvements Program Project No:wabd09 Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - 300,000 1,000,000 300,000 1,600,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 300,000 1,000,000 300,000 1,600,000 Capital Expenditures: Design - 300,000 - 300,000 600,000 Right of Way - - - - - Construction - - 1,000,000 - 1,000,000 - 300,000 1,000,000 300,000 1,600,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Program to fund capacity-related improvements to the water distribution system to address low pressures during peak hour demand and fire flows. Comprehensive Plan project D-02. Progress Summary: Future Impact on Operating Budget: No significant impact. 84 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Howard Road CCTF Expansion Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 348,908 1,099,622 1,448,530 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 348,908 1,099,622 1,448,530 Capital Expenditures: Design - - 348,908 - 348,908 Right of Way - - - - - Construction - - - 1,099,622 1,099,622 - - 348,908 1,099,622 1,448,530 Grants / Other Sources: With the completion of the Coal Creek Springs Rehabilitation, the Howard Road Corrosion Control Treatment Facility will exceed its current capacity. This project will add one aeration tower and one blower pump to match the existing towers and blowers. Comprehensive Plan project S-18. Progress Summary: Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 85 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Valley Service Area Reservoir No. 3 Project No:wabd26 Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 50,000 - 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - 50,000 - 50,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 700,000 510,000 1,260,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 700,000 510,000 1,260,000 Capital Expenditures: Design - - - 510,000 560,000 Property Acquisition - - 700,000 - 700,000 Construction - - - - - - 700,000 510,000 1,260,000 Grants / Other Sources: A new 1 million gallon storage facility is needed to meet future storage requirements in the Valley Service Area. Comprehensive Plan project R-04. Progress Summary: Reservoir siting study will be conducted in 2022, with property acquisition in 2026. Design of the project will be completed in 2028, with construction in 2028-2029. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 86 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Well 5/5A Upgrades Project No:cpxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - 947,000 112,000 1,640,000 2,699,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 947,000 112,000 1,640,000 2,699,000 Capital Expenditures: Design - - 112,000 - 112,000 Right of Way - 947,000 - - 947,000 Construction - - - 1,640,000 1,640,000 - 947,000 112,000 1,640,000 2,699,000 Grants / Other Sources: This project was identified in the 2016 Facilities Evaluation Study. Well 5 is in need of a new building, backup generator, chlorination, pump, and hydrologic investigation to evaluate the well's production. Due to the small size of the existing site, the acquisition of an adjacent parcel may be required. The Facilities Evaluation Study also identified the need for a new pump and motor in Well 5A. Comprehensive Plan project S-06. Progress Summary: The hydrologic study and property acquisition are anticipated to begin in 2025. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 87 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Well Inspection and Redevelopment Program Project No:wabd11 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - 200,000 - - 200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 200,000 - - 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 200,000 - - 200,000 - 200,000 - - 200,000 Grants / Other Sources: No significant impact. Program for inspection and redevelopment of supply wells and springs necessary to ensure production at maximum capacity for efficient utilization. Comprehensive Plan project S-07. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 88 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Water Repair & Replacements Project No:wabd02 Project Type:Non-Capacity (R&R) Project Manager:Various Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 130,000 - - 130,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - 100,000 - 100,000 Other - - - - - - 130,000 100,000 - 230,000 Capital Expenditures: Design - 130,000 100,000 - 230,000 Right of Way - - - - - Construction - - - - - - 130,000 100,000 - 230,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 300,000 1,000,000 300,000 - 1,600,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 100,000 Other - - - - - 300,000 1,000,000 300,000 - 1,700,000 Capital Expenditures: Design 300,000 - 300,000 - 700,000 Right of Way - - - - - Construction - 1,000,000 - - 1,000,000 300,000 1,000,000 300,000 - 1,700,000 Program to fund distribution system repair and replacement projects required for meeting peak demands and reducing system losses. Projects will be coordinated with the streets and other utility projects. Comprehensive Plan project D-09. Progress Summary: Future Impact on Operating Budget: No significant impact. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: 89 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Street Utility Improvements Project No:wabd01 Project Type:Non-Capacity Project Manager:Various Description: Progress Summary: CP2102 (4th Street SE) was funded under this program and will be completed in 2022. No significant impact Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 200,000 - 200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources:- - 200,000 - 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 200,000 - 200,000 Total Expenditures:- - 200,000 - 200,000 Forecasted Project Cost: Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 1,000,000 1,000,000 1,000,000 - 3,200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources:1,000,000 1,000,000 1,000,000 - 3,200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 1,000,000 1,000,000 1,000,000 - 3,200,000 Total Expenditures:1,000,000 1,000,000 1,000,000 - 3,200,000 Grants / Other Sources: Water main improvements in coordination with the Local Street Preservation Program and general arterial street improvements. Comprehensive Plan project D-06. Future Impact on Operating Budget: 90 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Reservoir Seismic Rehabilitation Project No:wabd16 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 86,000 - - 86,000 Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - - 86,000 - - 86,000 Capital Expenditures: Design - 86,000 - - 86,000 Right of Way - - - - - Construction - - - - - - 86,000 - - 86,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 262,000 - 298,000 - 560,000 Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - 262,000 - 298,000 - 560,000 Capital Expenditures: Design 65,000 - 88,000 - 153,000 Right of Way - - - - - Construction 197,000 - 210,000 - 407,000 262,000 - 298,000 - 560,000 Grants / Other Sources: Install seismic control valves on outlet piping of Reservoirs 4A, 4B, 8A, and 8B. This project will include a study to identify work to be completed at each site, and to further define project costs at each site. Costs for the remaining reservoirs will be updated based on the study. Seismic control valve for Reservoir 2 is a separate project. Comprehensive Plan project R-06. Progress Summary: The study to identify the work to be completed at each site was completed in 2020. Individual sites will be planned based on the study results. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 91 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Intertie Booster Pump Station Improvements Project No:wabd05 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 250,000 2,000,000 2,250,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - 250,000 2,000,000 2,250,000 Capital Expenditures: Design - - 250,000 250,000 Right of Way - - - - - Construction - - - 2,000,000 2,000,000 - - 250,000 2,000,000 2,250,000 Grants / Other Sources: Project will provide additional piping and modify the existing Intertie/ Lea Hill Booster pump station building to utilize the existing Intertie pumps for the Boosted zone. The project will also add pressure reducing valves and control valves at Lea Hill reservoirs, and system valves to provide efficient operation of the 132nd Ave Tacoma Intertie. Comprehensive Plan projects D-06, and PS-04. Progress Summary: Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 92 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Reservoir Painting Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 1,747,026 - 1,747,026 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - 1,747,026 - 1,747,026 Capital Expenditures: Design - - 227,026 227,026 Right of Way - - - - Construction - - 1,520,000 1,520,000 - - 1,747,026 - 1,747,026 Grants / Other Sources: Maintenance of reservoirs requires periodic painting to protect the steel and increase the useful life of the reservoir. Comprehensive Plan project R-05. Progress Summary: Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 93 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Coal Creek Springs Transmission Main Replacement Project No:cp1603 Project Type:Non-Capacity Project Manager:Seth Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue 396,402 262,452 - - 658,854 Parks Grants (State)- - - - - DWSRF Loan 234,666 - 3,700,000 - 3,934,666 Bond Proceeds - - - - - 631,068 262,452 3,700,000 - 4,593,520 Capital Expenditures: Design 631,068 262,452 - - 893,520 Right of Way - - - - - Construction - - 3,700,000 - 3,700,000 631,068 262,452 3,700,000 - 4,593,520 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - - Parks Grants (State)- - - - - DWSRF Loan - - - - 3,700,000 Bond Proceeds - - - - - - - - - 3,700,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 3,700,000 - - - - 3,700,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The facilities evaluation study conducted in 2013-2014 found a suspected leak on the 24" steel transmission main crossing the White River. This project plans to provide for full replacement of the transmission main suspended from a pedestrian bridge to be constructed across the White River. Parks Department will participate in the project by providing funding from grants for the trail connections to the bridge. This option eliminates the deep blow-off and allows more flexibility for expansion. A future project would rehabilitate the existing transmission main for redundancy. Comprehensive Plan project D-11. Progress Summary: Design underway in 2019 and 2020. Permitting in 2021. A DWSRF loan was applied for in 2020 for construction in 2022. Future Impact on Operating Budget: No significant impact 94 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 4th Street SE Preservation Project No:CP2102 Project Type:Non-Capacity Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 450,000 700,000 - 1,150,000 Grants (Fed,State,Local)- - - - Bond Proceeds - 135,575 100,000 - 235,575 Other - - - - - - 585,575 800,000 - 1,385,575 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - 535,575 800,000 - 1,335,575 - 585,575 800,000 - 1,385,575 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 700,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 100,000 Other - - - - - - - - - 800,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 800,000 - - - - 800,000 Grants / Other Sources: Along with the street reconstruction and other utility improvements, replace approximately 1,700 LF of 6" cast iron pipe between F St SE and L St Se with 8" ductile iron pipe. Replace approximately 630LF of 8" cast iron pipe between D St SE and F St SE with 8" ductile iron pipe. Progress Summary: Design is underway in 2021 with construction expected in 2022. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 95 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Reservoir Repair and Replacements Project No:wabd12 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 150,000 62,000 64,000 212,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 150,000 62,000 64,000 212,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 150,000 62,000 64,000 212,000 - 150,000 62,000 64,000 212,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 66,000 68,000 70,000 72,000 402,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 66,000 68,000 70,000 72,000 402,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 66,000 68,000 70,000 72,000 402,000 66,000 68,000 70,000 72,000 402,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: General reservoir maintenance and minor improvements. Comprehensive Plan project R-03. Progress Summary: In 2018, project costs were escalated at 3% per year from 2015 to year of construction. Future Impact on Operating Budget: No significant impact. 96 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: R Street SE Improvements Project No:CP2116 Project Type: Project Manager:Luis Barba Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 70,000 - 60,000 70,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 70,000 - 60,000 70,000 Capital Expenditures: Design - 70,000 - 60,000 70,000 Right of Way - - - - - Construction - - - - - - 70,000 - 60,000 70,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 1,000,000 - - - 1,060,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,000,000 - - - 1,060,000 Capital Expenditures: Design - - - - 60,000 Right of Way - - - - - Construction 1,000,000 - - - 1,000,000 1,000,000 - - - 1,060,000 Grants / Other Sources: Total Expenditures: Non-capacity Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Along with the street reconstruction and other utility improvements, replace approximately 2,830 LF of 8" cast iron pipe with 12" ductile iron pipe, along with valves, fire hydrants, and services. Progress Summary: Design is underway in 2021 with construction expected in 2024. Future Impact on Operating Budget: No significant Impact 97 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 2021 Local Street Reconstruction Project No:cp2019 Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 130,000 - - 130,000 Grants (Fed,State,Local)- - - - - Bond Proceeds 46,726 2,563,274 10,000 - 2,620,000 Other - - - - - 46,726 2,693,274 10,000 - 2,750,000 Capital Expenditures: Design 46,726 35,280 - - 82,006 Right of Way - - - - - Construction - 2,657,994 10,000 - 2,667,994 46,726 2,693,274 10,000 - 2,750,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 10,000 Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will construct water main improvements on G Street SE between E. Main Street and 4th Street SE and in various streets in the Riverwalk neighborhood. The improvements are coordination with the 2021 Local Street Preservation project and include replacing 1,250 feet of 4" cast iron pipe with 8" ductile iron water main and 43 services on G ST SE. and replacement of 4,360 feet of 6" cast iron pipe and 730 feet of 4" cast iron with 8" ductile iron main and 110 services in the Riverwalk area. Comprehensive Plan project D-06. Progress Summary: Project design began in 2020. Future Impact on Operating Budget: No significant impact 98 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Auburn Way Pavement Patching Project No:CP2120 Project Type:Non-Capacity Project Manager:Aleksey Koshman Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 50,000 100,000 - 150,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 50,000 100,000 - 150,000 Capital Expenditures: Design - 10,000 - - 10,000 Right of Way - - - - - Construction - 40,000 100,000 - 140,000 - 50,000 100,000 - 150,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 100,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 100,000 - - - - 100,000 Grants / Other Sources: Roadway restoration of trench patches from water leak repair and water service installation on Auburn Way that are beyond the scope of work done by maintenance staff. Progress Summary: Project design in 2021 with construction in 2022. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 99 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: M Street NE Widening Project No:wabd13 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 37,000 - 37,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 37,000 - 37,000 Capital Expenditures: Design - - 37,000 - 37,000 Right of Way - - - - - Construction - - - - - - - 37,000 - 37,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 320,000 - - - 357,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 320,000 - - - 357,000 Capital Expenditures: Design - - - - 37,000 Right of Way - - - - - Construction 320,000 - - - 320,000 320,000 - - - 357,000 Grants / Other Sources: Water main improvements constructed in conjunction with streets project: M ST NE widening (E Main to 4th St NE). Work includes replacing 26 services, connecting to existing 12" ductile main, and abandoning 6" cast main in place. Comprehensive Plan project D-06. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Progress Summary: Future Impact on Operating Budget: No significant Impact 100 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Auburn Way South - Hemlock Street SE to Poplar Street SE Project No:cp1622 Project Type:Non-Capacity Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 66,000 - 2,176,000 66,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 66,000 - 2,176,000 66,000 Capital Expenditures: Design - 66,000 - 66,000 Right of Way - - - - - Construction - - - 2,176,000 - - 66,000 - 2,176,000 66,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 256,000 - - - 2,432,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 256,000 - - - 2,432,000 Capital Expenditures: Design - - - - - Right of Way - - - - Construction 256,000 - - - 2,432,000 256,000 - - - 2,432,000 Grants / Other Sources: Water main improvements constructed in conjunction with Auburn Way South street improvements. Project will replace approximately 2,300 feet of 10" cast iron line with 12" ductile Iron water main. Comprehensive Plan project D-06. Progress Summary: Design began in 2020 in conjunction with Auburn School District's Chinook Elementary School Replacement project. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 101 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Water Trench Patches Program Project No:wabd28 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 155,000 160,000 155,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 155,000 160,000 155,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 155,000 160,000 155,000 - - 155,000 160,000 155,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 165,000 170,000 175,000 180,000 1,005,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 165,000 170,000 175,000 180,000 1,005,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 165,000 170,000 175,000 180,000 1,005,000 165,000 170,000 175,000 180,000 1,005,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This program provides annual funding for roadway restoration of trench patches from water leak repair and water service installation that are beyond the scope of work done by maintenance staff. Progress Summary: Program was developed in 2020 to adhere to pavement restoration requirements in the City Engineering Design standards. 2021 funding was used for CP2120 Auburn Way Pavement Patching. Future Impact on Operating Budget: No significant impact 102 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Lea Hill Pump Station Replacement Project No:wabd18 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - 491,000 746,333 5,300,000 6,537,333 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 491,000 746,333 5,300,000 6,537,333 Capital Expenditures: Design - 491,000 - - 491,000 Right of Way - - - - - Construction - - 746,333 5,300,000 6,046,333 - 491,000 746,333 5,300,000 6,537,333 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Lea Hill pump station will be reconstructed to provide redundant pumped supply to the Lea Hill area. If the Green River Pump Station is out of service for maintenance, a redundant pump station would avoid the need to purchase more expensive regional surface water through the 132nd Intertie. The pump station needs to be relocated from its current location on the shoulder of Lea Hill Road at the base of a steep hill for safety and reliability considerations. The project will also construct approximately 900 feet of 12" transmission main along Lea Hill Rd from Garden Avenue to the existing pump station site. Comprehensive Plan project PS-10. Progress Summary: Property acquisition completed in 2020 under Garden Ave Realignment project. Future Impact on Operating Budget: No significant Impact 103 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Deduct Meter Replacement Program, Phases 1 through 3 Project No:cp1917, cp2001, cp2115 Project Type:Non-Capacity Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue 23,975 38,525 100,000 - 162,500 Grants (Fed,State,Local)- - - - - Bond Proceeds 365,049 579,969 385,000 - 1,330,018 Other - - - - - 389,024 618,494 485,000 - 1,492,518 Capital Expenditures: Design 23,986 28,476 - - 52,462 Right of Way - - - - - Construction 365,038 590,018 485,000 - 1,440,056 389,024 618,494 485,000 - 1,492,518 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 385,000 Other - - - - - - - - - 485,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 485,000 - - - - 485,000 Grants / Other Sources: Approximately 200 non-single family irrigation meters within the water system are connected to the customer's supply line on the customer side of the domestic meter, instead of being directly connected to the water main. Since sewer charges for non-single family customers are based on the domestic water meter reading and irrigation water does not use the sewer system, customers ask to have the irrigation use deducted from their overall domestic use for sewer billing purposes. Thus, irrigation meters installed after the domestic meter are referred to as "deduct meters". To improve the billing process, increase staff efficiencies and eliminate manual calculations in the billing process this project will re-install the irrigation meters to directly connect to the main. Deduct meters will be converted to irrigation meters to more equitably bill water usage. Progress Summary: Construction was planned and budgeted to be completed in 4 years. Recent bids indicate the original cost estimate was low. The budget was increased in 2021 and 2022, and the project will be completed in 3 years (2020-2022). Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 104 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Comprehensive Water Plan Project No:wabd25 Project Type:Non-Capacity Project Manager:Susan Fenhaus Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 122,000 263,000 251,000 385,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 122,000 263,000 251,000 385,000 Capital Expenditures: Design - 122,000 263,000 251,000 385,000 Right of Way - - - - - Construction - - - - - - 122,000 263,000 251,000 385,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 20,000 - - - 534,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 20,000 - - - 534,000 Capital Expenditures: Design 20,000 - - - 534,000 Right of Way - - - - - Construction - - - - - 20,000 - - - 534,000 Grants / Other Sources: Update the Comprehensive Water Plan as required by Washington Department of Health (DOH) by May 2022. DOH changed WAC to require a 10-year planning period which is an increase from the 6-year period. Current plan (2015) was approved before the code change, but was written to include the 10-year period in anticipation of the revised code. In August 2021, submitted update letter to DOH requesting extension of approved plan. The letter included a report of the demand forecast compared to actual demand, and report of the capital improvement plan. If the extension is approved, next complete plan will be due in 2025. However, the water plan will need to be updated in conjunction with the City's Comprehensive Plan due in 2024. Progress Summary: Request for current plan extension was submitted in 2021. Complete update will begin in 2022. Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 105 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Lea Hill AC Main Replacement Project No:cp1929 Project Type:Non-Capacity Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds 1,479,008 918,992 10,000 - 2,408,000 Other - - - - - 1,479,008 918,992 10,000 - 2,408,000 Capital Expenditures: Design 243,786 18,992 - - 262,778 Right of Way - - - - - Construction 1,235,222 900,000 10,000 - 2,145,222 1,479,008 918,992 10,000 - 2,408,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 10,000 Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Distribution system repair and replacement project required for meeting peak demands and reducing system losses. Project will replace asbestos cement (AC) water main in the Lea Hill service area. Progress Summary: Project substantially complete in 2021. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 106 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Reservoir 2 Valves Project No:wabd29 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 240,000 760,000 240,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 240,000 760,000 240,000 Capital Expenditures: Design - - 240,000 - 240,000 Right of Way - - - - - Construction - - - 760,000 - - - 240,000 760,000 240,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 1,000,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,000,000 Capital Expenditures: Design - - - - 240,000 Right of Way - - - - - Construction - - - - 760,000 - - - - 1,000,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will replace the existing 20" supply valve with a seismic control valve, and replace the 12" drain valve at Reservoir 2. Both valves will be installed in a vault. This project was identified as a maintenance issue due to limited access to the valves. The addition of a seismic control will improve the resiliency of the distribution system. Progress Summary: Grant application for hazard mitigation submitted. Future Impact on Operating Budget: No significant impact 107 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 104th Park Development (104th to 102nd Water Main Loop) Project No:cp1619 Project Type:Non-Capacity Project Manager:Jamie Kelly Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 250,000 50,000 - 300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 250,000 50,000 - 300,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - 200,000 50,000 - 250,000 - 250,000 50,000 - 300,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will construct a water main between 102nd Avenue SE and 104 Avenue SE is part of a Parks Department project that is developing a new City park. The new water main will eliminate convert the existing dead-end system to a looped system, as recommended by the Comprehensive Plan. Progress Summary: Project design underway in 2021. Future Impact on Operating Budget: No significant impact 108 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Garden Avenue Realignment Project No:cp2022 Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue 324 167,075 440,000 - 607,399 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 324 167,075 440,000 - 607,399 Capital Expenditures: Design 324 55,000 - - 55,324 Right of Way - - - - - Construction - 112,075 440,000 - 552,075 324 167,075 440,000 - 607,399 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 440,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 440,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 440,000 - - - - 440,000 Grants / Other Sources: This project will construct water improvements as part of the Garden Avenue Realignment transportation project. The improvements include installation of 1,000 feet of 12" transmission main from the 20" existing main in 8th St NE along Garden Avenue to the location of a future new booster pump station site on property to be purchased on 102nd Ave SE, and then back to 8th St NE. Progress Summary: Acquired property for future pump station in 2020. Design of water main under way in 2021. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 109 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Lead Service Line Replacement Project No:cp1922 Project Type:Non-Capacity Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue 1,169 516,362 50,000 - 567,531 Grants (Fed,State,Local)- - - - - Bond Proceeds 389,410 1,860,590 - - 2,250,000 DWSRF 86,095 2,913,905 - 3,000,000 476,674 5,290,857 50,000 - 5,817,531 Capital Expenditures: Design 476,674 840,857 - - 1,317,531 Right of Way - - - - - Construction - 4,450,000 50,000 - 4,500,000 476,674 5,290,857 50,000 - 5,817,531 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - DWSRF - - - - - - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The City has approximately 1,000 service lines with a lead goose-neck connection at the main. State and Federal agencies are planning a 15 year period for utilities to remove all lead service lines. This project will remove lead service lines and construct associated roadway restoration throughout the City. Any additional lead service lines that are not removed and replaced with this project will be replaced as part of future rehabilitation and replacement projects. Progress Summary: City received a Drinking Water State Revolving Fund (DWSRF) loan for replacement of the lead service lines. Design completed. Construction began in 2021. Future Impact on Operating Budget: No significant Impact 110 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Well 4 Facility Improvements Project No:cp2021 Project Type:Non-Capacity Project Manager:Seth Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 191,000 1,015,000 - 1,206,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 191,000 1,015,000 - 1,206,000 Capital Expenditures: Design - 191,000 - - 191,000 Right of Way - - - - - Construction - - 1,015,000 - 1,015,000 - 191,000 1,015,000 - 1,206,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 1,015,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,015,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 1,015,000 - - - - 1,015,000 This project was identified in the Facilities Evaluation Study. The project will include a comprehensive investigation and evaluation of the well operation. Findings from the evaluation will likely result in replacing the generator with a larger unit, possibly replacing the motor soft starter with a variable frequency drive (VFD), and replacing aging control valves, gate valves, and air relief system. Comprehensive Plan project S-22. Progress Summary: Design underway in 2021, with construction anticipated to be complete in 2022. Future Impact on Operating Budget: No significant Impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 111 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Water Resources Protection Program (Wellhead Protection) Project No:wabd23 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - 27,700 28,500 27,700 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 27,700 28,500 27,700 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 27,700 28,500 27,700 - - 27,700 28,500 27,700 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 29,400 30,200 31,200 33,100 180,100 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 29,400 30,200 31,200 33,100 180,100 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 29,400 30,200 31,200 33,100 180,100 29,400 30,200 31,200 33,100 180,100 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Annual funding for implementing strategies identified in the Wellhead Protection Plan. Although some tasks will be performed as part of the water operations budget, other tasks will require consultants with expertise in review and investigation of contaminant sites and other environmental databases, development of spill response plans, and leaking underground storage tanks. Comprehensive Plan project S-08. Progress Summary: Future Impact on Operating Budget: No significant Impact 112 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Game Farm Park Pump Station/Distribution System Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - 69,782 329,774 399,556 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 69,782 329,774 399,556 Capital Expenditures: Design - - 69,782 - 69,782 Right of Way - - - - - Construction - - - 329,774 329,774 - - 69,782 329,774 399,556 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The pumps at Game Farm Wilderness Park are in need of replacement, and the building need repairs. This project was identified in the 2015 Comprehensive Plan as occurring in the short to mid term, or by 2025. Installation of new water main crossing the White River to eliminate the pump station was identified as being completed by 2035. The Coal Creek Springs Transmission Main project will add a pipe crossing the White River to be used for installation of a water main for Game Farm Wilderness Park. Completion of the river crossing will enable the water main project to be completed sooner and eliminate the need for pump station improvements. This project will install new main within the Game Farm Park from the existing 8" near the amphitheater to the river crossing, and from the river crossing to the existing pump station in the Wilderness area. The project will also decommission the existing pump station. Comprehensive Plan project D16. Progress Summary: Future Impact on Operating Budget: No significant Impact 113 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: D Street SE Storm Improvements Project No:cp2126 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources: Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 90,000 - 1,000,000 90,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 90,000 - 1,000,000 90,000 Capital Expenditures: Design - 90,000 - - 90,000 Right of Way - - - - - Construction - - - 1,000,000 - - 90,000 - 1,000,000 90,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 1,000,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,000,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 1,000,000 - - - - 1,000,000 Grants / Other Sources: Total Expenditures: Non-capacity Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Along with the storm drainage and other facility improvements, replace approximately 1,540 LF of 6" cast iron pipe with 8" ductile iron pipe, replace 380 LF of 12" cast iron pipe with ductile iron pipe, and install 335 LF of 8" ductile iron pipe, along with valves, fire hydrants, and service. Progress Summary: Design will begin in early 2022, with construction expected in 2023. Future Impact on Operating Budget: No significant Impact 114 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: West Hill Springs Water Quality Improvements Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue 100,000 480,000 - - 580,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 100,000 480,000 - - 580,000 Capital Expenditures: Design 100,000 - - - 100,000 Right of Way - - - - - Construction - 480,000 - - 480,000 100,000 480,000 - - 580,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The aging chlorination building at West Hill Springs will be replaced and a new liquid chlorination system will be installed. Additionally, aeration to adjust pH will be required. Comprehensive Plan project S-12. Progress Summary: Additional cost refinement will be needed due to the need for additional improvements not originally identified in the Comprehensive Plan. Future Impact on Operating Budget: No significant Impact 115 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 23rd Street SE Storm Improvements Project No:cp2125 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 50,000 - 540,000 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 50,000 - 540,000 50,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - - - 540,000 - - 50,000 - 540,000 50,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 540,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 540,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 540,000 - - - - 540,000 Grants / Other Sources: Total Expenditures: Non-capacity Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Along with the storm drainage and other facility improvements, replace approximately 1,225 LF of 6" and 8" cast iron pipe with 8" ductile iron pipe, along with valves, fire hydrants, and service. Progress Summary: Design will begin in early 2022, with construction expected in 2023. Future Impact on Operating Budget: No significant Impact 116 City of Auburn Capital Facilities Plan WATER FUND (460)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: C St SW Preservation Project No:CP2123 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Water Revenue - 30,000 - 700,000 30,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 30,000 - 700,000 30,000 Capital Expenditures: Design - 30,000 - - 30,000 Right of Way - - - - - Construction - - - 700,000 - - 30,000 - 700,000 30,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Water Revenue - - - - 700,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 700,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 700,000 - - - - 700,000 Grants / Other Sources: Total Expenditures: Non-capacity Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Along with the street reconstruction and other utility improvements, replace approximately 300 LF of 8" cast ion pipe with 12" ductile iron pipe and replace 560 LF of 16" cast iron pipe with 16" ductile iron pipe, along with valves fire hydrants and services. Progress Summary: Design will begin in early 2022, with construction expected in 2023. Future Impact on Operating Budget: No significant Impact 117 City of Auburn Capital Facilities Plan 118 City of Auburn Capital Facilities Plan SANITARY SEWER Current Facilities The City’s sanitary sewer service area encompasses approximately 28-square miles that are primarily within the City limits but includes a total of approximately ½ square mile within Auburn’s Proposed Annexation area (PAA). The City contracts with King County for sewage treatment and disposal. The City’s Sanitary Sewer Utility is responsible for the collection and transmission of wastewater to the King County trunk lines. The City’s current inventory of approximately 218 miles of sewer lines serves the City’s sewer service area. Table S-1, Facilities Inventory, lists the sewage collection and transmission facilities along with their capacities and locations. Level of Service (LOS) The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level of service (LOS), or design criteria, for the City’s sewage collection system. These standards represent the average quantities of sewage that the system is designated to accommodate for residential, industrial, and commercial development. Capital Facilities Projects and Financing Investments in the City’s sewage collection facilities include primarily non-capacity improvements and replacement projects. Anticipated projects include replacement of aging sewer pipes and manholes in conjunction with arterial and local street improvements, replacement of pipe identified through the sewer program’s condition assessment process, replacement of the Rainier Ridge Pump station, and updating the Comprehensive Sewer Plan. Additionally, the City will continue to monitor flow rates, primarily within the Valley Basin area to help identify specific areas of the City that show high levels of inflow and infiltration. The City of Auburn’s sewer system includes one capacity project in the amount of $75,000 and fifteen non- capacity projects totaling $16,054,879 for an overall six-year plan of $16,129,879. Table S-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for sanitary sewer facilities during the six years 2023 – 2028. 119 City of Auburn Capital Facilities Plan TABLE S-1 Facilities Inventory Sewage Facilities CAPACITY FACILITY (MGD)LOCATION Pump Stations: 8th Street 0.26 900 8th Street NE 22nd Street 0.79 1950 22nd Street NE Area 19 0.47 800 71st Street SE Auburn 40 0.63 4159 O Place NE Dogwood 0.43 1423 Dogwood Street SE Ellingson 2.20 100 41st Street SE F Street 0.86 1700 F Street SE Hudson 0.76 6408 S 287th Street North Tapps 0.73 2610 Lake Tapps Pkwy SE Peasley Ridge 0.36 5225 South 320th Street Promenade 0.25 12900 SE 312th Street R Street 0.14 600 R Street NE Rainier Ridge 0.29 31809 125th Place SE Riverside 0.58 13900 104th Avenue SE Terrace View 0.94 104 60th Street SE Valley Meadows 0.18 2022 4th Street SE Verdana 2.88 11807 SE 296th Place (Kent, WA) FACILITY Pipe Size LOCATION River Crossings: Inverted Syphon 8 & 12 Inch Green River & 26th Street NE 8th Street Bridge 14 Inch Green River & 8th Street NE 120 City of Auburn Capital Facilities Plan TABLE S-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 124 Garden Avenue Re-alignment Capital Costs 75,000 - - - - - 75,000 Funding Sources: Sewer Fund 75,000 - - - - - 75,000 Bond Proceeds - - - - - - - Subtotal, Capacity Projects: Capital Costs 75,000 - - - - - 75,000 Non-Capacity Projects: 125 Sanitary Sewer Repair & Replacement Program Capital Costs 300,000 1,500,000 300,000 1,500,000 300,000 1,500,000 5,400,000 Funding Sources: Sewer Fund 300,000 1,500,000 300,000 1,500,000 300,000 1,500,000 5,400,000 Bond Proceeds - - - - - - - 126 Street Utility Improvements Capital Costs 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Funding Sources: Sewer Fund 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Bond Proceeds - - - - - - - 127 Vactor Decant Facility Capital Costs 180,000 - - - - - 180,000 Funding Sources: Sewer Fund 180,000 - - - - - 180,000 Bond Proceeds - - - - - - - 128 Manhole Ring and Cover Replacement Capital Costs 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Funding Sources: Sewer Fund 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Bond Proceeds - - - - - - - 129 Sewer Pump Station Replacement/Improvement Program Capital Costs - 255,000 525,000 2,900,000 - - 3,680,000 Funding Sources: Sewer Fund - 255,000 525,000 2,900,000 - - 3,680,000 Bond Proceeds - - - - - - - 130 Pump Station Electrical Improvements Capital Costs 10,000 - - - - - 10,000 Funding Sources: Sewer Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - CAPITAL FACILITIES PLAN PROJECTS AND FINANCING SEWER FUND 121 City of Auburn Capital Facilities Plan 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 131 Inflow and Infiltration Study Capital Costs 167,000 172,000 - - - - 339,000 Funding Sources: Sewer Fund 167,000 172,000 - - - - 339,000 Bond Proceeds - - - - - - - 132 Comprehensive Sewer Plan Update Capital Costs 80,000 180,000 20,000 - - - 280,000 Funding Sources: Sewer Fund 80,000 180,000 20,000 - - - 280,000 Bond Proceeds - - - - - - - 133 4th Street SE Preservation Capital Costs 550,000 - - - - - 550,000 Funding Sources: Sewer Fund 550,000 - - - - - 550,000 Bond Proceeds - - - - - - - 134 M Street NE Widening Capital Costs 12,000 - 112,000 - - - 124,000 Funding Sources: Sewer Fund 12,000 - 112,000 - - - 124,000 Bond Proceeds - - - - - - - 135 Rainier Ridge Pump Station Rehabilitation/Replacement Capital Costs 2,900,000 - - - - - 2,900,000 Funding Sources: Sewer Fund 2,900,000 - - - - - 2,900,000 Bond Proceeds - - - - - - - 136 2nd Street SE Preservation Capital Costs 146,879 - - - - - 146,879 Funding Sources: Sewer Fund 146,879 - - - - - 146,879 Bond Proceeds - - - - - - - 137 2021 Sewer Repair and Replacement Capital Costs 500,000 - - - - - 500,000 Funding Sources: Sewer Fund 500,000 - - - - - 500,000 Bond Proceeds - - - - - - - 138 23rd SE Storm Improvements Capital Costs 15,000 150,000 - - - - 165,000 Funding Sources: Sewer Fund 15,000 150,000 - - - - 165,000 Bond Proceeds - - - - - - - 139 Regional Growth Center Access Improvements Capital Costs - 100,000 - - - - 100,000 Funding Sources: Sewer Fund - 100,000 - - - - 100,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 5,140,879 2,637,000 1,237,000 4,680,000 580,000 1,780,000 16,054,879 122 City of Auburn Capital Facilities Plan SUMMARY: CAPITAL COSTS Capacity Projects 75,000 - - - - - 75,000 Non-Capacity Projects 5,140,879 2,637,000 1,237,000 4,680,000 580,000 1,780,000 16,054,879 Total Costs 5,215,879 2,637,000 1,237,000 4,680,000 580,000 1,780,000 16,129,879 FUNDING SOURCES: Utility Funds (Sewer)5,215,879 2,637,000 1,237,000 4,680,000 580,000 1,780,000 16,129,879 Bond Proceeds - - - - - - - Total Funding 5,215,879 2,637,000 1,237,000 4,680,000 580,000 1,780,000 16,129,879 123 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Garden Avenue Re-alignment Project No:CP2022 Project Type: Project Manager:Kim Truong Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 17,500 75,000 - 92,500 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 17,500 75,000 - 92,500 Capital Expenditures: Design - 17,500 5,000 - 22,500 Right of Way - - - - Construction - - 70,000 - 70,000 - 17,500 75,000 - 92,500 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 75,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 75,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - 70,000 - - - - 75,000 Grants / Other Sources: No significant impact Capacity Along with the extension of the road between Garden Avenue and 104th Ave SE, extend the existing sewer line in the new east/west roadway from the existing manhole to Garden Avenue (approx.. 220 feet of 8” PVC pipe). Install two side sewer stubs to the properties north and south of the new road extension. Progress Summary: Design for the project is underway. Project construction is anticipated to be completed in 2022 The majority of property owners along Garden Avenue either did not support or did not respond to questionnaire regarding additional sewer extensions along Garden Avenue, so they will not be included in the project. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 124 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Sanitary Sewer Repair & Replacement/System Improvements Program Project No:sebd01 Project Type: Project Manager:Bob Elwell Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue 300,000 1,500,000 300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 300,000 1,500,000 300,000 Capital Expenditures: Design - - 250,000 150,000 250,000 Right of Way - - 20,000 20,000 Construction - - 30,000 1,350,000 30,000 - - 300,000 1,500,000 300,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 300,000 1,500,000 300,000 1,500,000 5,400,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 300,000 1,500,000 300,000 1,500,000 5,400,000 Capital Expenditures: Design 250,000 150,000 250,000 150,000 1,200,000 Right of Way 20,000 - 20,000 - 60,000 Construction 30,000 1,350,000 30,000 1,350,000 4,140,000 300,000 1,500,000 300,000 1,500,000 5,400,000 Grants / Other Sources: Non-Capacity (Repair and Replacement) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This program should slightly decrease the operating budget by correcting the problems that require operation staff's attention. Repair and replace (R&R) broken sewer mains and other facilities. These lines will be identified through television inspection and routine cleaning. This program includes funding for R&R projects which have not yet been identified as a separate R&R project or are not associated with transportation projects. Anticipated projects include bi-annual, stand-alone, repair and replacement projects for sewer lines which are broken, misaligned, "bellied" or otherwise require an inordinate amount of maintenance effort or present a risk of backup or trench failure, and facilities which generate consistent odor complaints. For efficiency and cost savings, sewer R&R may be combined with other public facility improvements. Additionally, system improvements which enhance the ability to maintain service are included here. Comprehensive Plan Project #1. Progress Summary: In 2021, funds from this program were transferred to CP2010 - 2021 Sewer Repair and Replacement project and CP2102 - 4th Street SE Preservation, which will use those funds to repair or replace sewer lines at 18 sites around the City. Future Impact on Operating Budget: 125 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Street Utility Improvements Project No:sebd02 Project Type: Project Manager:Bob Elwell Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 4,500 200,000 200,000 204,500 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 4,500 200,000 200,000 204,500 Capital Expenditures: Design 1,000 30,000 30,000 31,000 Right of Way - - - Construction 3,500 170,000 170,000 173,500 - 4,500 200,000 200,000 204,500 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 200,000 200,000 200,000 200,000 1,200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 200,000 200,000 200,000 200,000 1,200,000 Capital Expenditures: Design 30,000 30,000 30,000 30,000 180,000 Right of Way - - - - - Construction 170,000 170,000 170,000 170,000 1,020,000 200,000 200,000 200,000 200,000 1,200,000 Grants / Other Sources: Non Capacity (Repair and Replacement) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant Impact Sewer system repair and replacements in coordination with transportation projects. Comprehensive Plan Project #2. Progress Summary: 2021 transfers from this fund were made to CP2003 - 2nd Street SE Preservation, CP2022 - Garden Street Realignment, CP2110 - Regional Growth Center Access Improvements, and CP2102 - 4th Street SE Preservation. Future Impact on Operating Budget: 126 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Sewer Vactor Decant Facility Project No:sebd03 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - - 180,000 - 180,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 180,000 - 180,000 Capital Expenditures: Design - - 180,000 - 180,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - 180,000 - 180,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 180,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 180,000 Capital Expenditures: Design - - - - 180,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - - - 180,000 Grants / Other Sources: Non-Capacity (Improvements) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project could decrease the future operating budget by reducing the expenses associated with hauling saturated waste to the County landfill. Currently the City hauls vactored sewage waste to the County landfill on a biweekly basis. The sewage sludge is considerably wet, thus Utility funds are paying for the disposal of water. This project consists of a study/analysis to assess the City’s vactor disposal method and identify a cost-effective alternative to the status quo. Possible recommendations may include maintaining current operations, constructing a gravity decant facility, incorporating special equipment into the vactor truck to increase decanting ability, purchasing specialized dewatering machinery, or collaborating with neighboring utilities for the shared use of facilities and equipment. Comprehensive Plan Project #3. Progress Summary: This analysis will be completed in 2022. Future Impact on Operating Budget: 127 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Manhole Ring and Cover Replacement Project No:sebd04 Project Type: Project Manager:Bob Elwell Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 59,000 80,000 80,000 139,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 59,000 80,000 80,000 139,000 Capital Expenditures: Design - 5,000 8,000 8,000 13,000 Right of Way/Property Acquisition - - - - - Construction - 54,000 72,000 72,000 126,000 - 59,000 80,000 80,000 139,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 80,000 80,000 80,000 80,000 480,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 80,000 80,000 80,000 80,000 480,000 Capital Expenditures: Design 8,000 8,000 8,000 8,000 48,000 Right of Way/Property Acquisition - - - - - Construction 72,000 72,000 72,000 72,000 432,000 80,000 80,000 80,000 80,000 480,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project could decrease the future operating budget by reducing the need for staff to respond to loose manholes or lids. Non-Capacity (Repair and Replacement) As manholes and roads age and their condition deteriorates, access covers and the rings in which they sit can become loose and/or misaligned, and can become a road hazard requiring maintenance staff attention and increasing the City's liability. This annual project will replace approximately 50 sewer manhole rings and covers to maintain access to the sewer system and to decrease the likelihood of the manholes becoming road hazards. In some years, this replacement will be as a stand- alone project, and in some years many of these replacements will be in conjunction with other City capital projects. Comprehensive Plan Project #7. Progress Summary: Ongoing Future Impact on Operating Budget: 128 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Sewer Pump Station Replacement/Improvement Program Project No:sebd05 Project Type: Project Manager:Bob Elwell Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - - - 255,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 255,000 - Capital Expenditures: Design - - - 255,000 255,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - - 255,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 525,000 2,900,000 - - 3,680,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 525,000 2,900,000 - - 3,680,000 Capital Expenditures: Design 525,000 230,000 - - 1,010,000 Right of Way/Property Acquisition - - - - - Construction - 2,670,000 - - 2,670,000 525,000 2,900,000 - - 3,680,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: Non-Capacity (Repair and Replacement/Improvements) Total Funding Sources: The Sewer Utility's infrastructure currently consists of 17 public sewer pump stations that range in age from 2 to over 50 years old. As those stations age, and utility operations change, considerations such as station condition, component condition, capacity, reliability, and safety suggest that stations be upgraded, rehabilitated, and replaced. This program fund will provide funding to meet those needs through 2025. Comprehensive Plan Project #4. Progress Summary: Following the results of the systematic pump station evaluation study, the 2017-2022 funds for this program were divided into the Pump Station Electrical Improvements project (for common improvements at many stations) and the Pump Station Replacement project (for Rainier Ridge) As future considerations of reliability, capacity, and condition are evaluated, and specific projects are developed, these funds will be designated for those projects. Future Impact on Operating Budget: This project will not have a significant effect on operating budget. 129 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Pump Station Electrical Improvements Project No:cp1812 Project Type: Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue 237,717 1,042,283 10,000 - 1,290,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 237,717 1,042,283 10,000 - 1,290,000 Capital Expenditures: Design 209,675 - - - 209,675 Right of Way - - - - - Construction 28,042 1,042,283 10,000 - 1,080,325 237,717 1,042,283 10,000 - 1,290,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 10,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Non-capacity This project will design and construction improvements to the City's sewer pump stations' electrical systems that were identifed by the 2016 Pump Station Condition Assessment Project. The additions and modifications are intended to increase employee safety as well as operational efficiency. They include adding dry well control panel disconnects, bringing intrinsically safe wiring up to code, organizing, labelling, and dressing out control panel boxes, adding dry well HMI computer screens, creating uniform as-built wiring diagrams for each station, as well as several other modifications identified for specific stations. Funding for this project was derived from the Sewer Pump Station Replacement/Improvement program (sebd05). Progress Summary: The project is anticipated to be substantially complete by the end of 2021, with project closeout in early 2022. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. 130 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Inflow and Infiltration Study Project No:CP2124 Project Type: Project Manager:Elwell Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 163,000 167,000 172,000 330,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 163,000 167,000 172,000 330,000 Capital Expenditures: Design/Analysis - 163,000 167,000 172,000 330,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - 163,000 167,000 172,000 330,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 339,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 339,000 Capital Expenditures: Design/Analysis - - - - 339,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - - - 339,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Improvement) This project will assess portions of the City Sewer Service Area for infiltration/inflow (I/I) values. Excessive localized I/I can be an indicator of poor sewer main and side sewer conditions and could contribute to capacity issues in the future. This project will monitor flow in the collection system over several years. This data will then be used to help identify repair and replacement needs, modeling purposes, and for I/I assessment in future updates to the Comprehensive Sewer Plan. Comprehensive Plan Project #9. Progress Summary: Initial flow monitors were installed in May, 2020 with additional monitors were added in September/October, 2020. Monitoring locations for September/October, 2021 were determined based on the results of the initial phase of monitoring. The two years of data collection coincide with King County's flow monitoring program which will allow the data to be shared and correlated. Future Impact on Operating Budget: 131 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Comprehensive Sewer Plan Update Project No:sebd12 Project Type: Project Manager:Bob Elwell Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - - 80,000 180,000 80,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 80,000 180,000 80,000 Capital Expenditures: Design - - 80,000 180,000 80,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - 80,000 180,000 80,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 20,000 - - - 280,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 20,000 - - - 280,000 Capital Expenditures: Design 20,000 - - - 280,000 Right of Way/Property Acquisition - - - - - Construction - - - - - 20,000 - - - 280,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Non-Capacity (Repair and Replacement/Improvement) This project will not have a significant effect on operating budget. This project will prepare an update to the City's Sewer Comprehensive Plan to be adopted by City Council as part of the City's overall Comprehensive Plan to be completed by June 2024. City staff will prepare portions of the plan and will engage consultants to complete some of the tasks including hydraulic modeling, financial analysis, cost estimation and overal plan preparation/assembly. Comprehensive Plan Project #10. Progress Summary: Preliminary work on policy review, project schedule, and hiring a consultant for hydraulic modeling and plan preparation is anticipated to be completed 2021. The plan is anticipated to be completed by late 2023 for adoption with City Comprehensive Plan in 2024. Future Impact on Operating Budget: 132 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 4th Street SE Preservation Project No:cp2102 Project Type: Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 125,000 550,000 - 675,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 125,000 550,000 - 675,000 Capital Expenditures: Design - 125,000 20,000 - 145,000 Right of Way - - - - Construction - - 530,000 - 530,000 - 125,000 550,000 - 675,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 550,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 550,000 Capital Expenditures: Design - - - - 20,000 Right of Way - - - - - Construction - - - - 530,000 - - - - 550,000 Grants / Other Sources: This project should slightly decrease the operating budget by correcting problems that require operation staff's attention. Non-capacity Along with the street reconstruction and other utility improvements, replace approximately 950 feet of 8" and 150 feet of 21" diameter sanitary sewer mains as well as provide new side sewers to each parcel served by those mains. Progress Summary: Design is underway in 2021 with construction expected in 2022. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 133 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: M Street NE Widening Project No:sebd08 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - - 12,000 - 12,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 12,000 - 12,000 Capital Expenditures: Design - - 12,000 - 12,000 Right of Way - - - - - Construction - - - - - - - 12,000 - 12,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue 112,000 - - - 124,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 112,000 - - - 124,000 Capital Expenditures: Design 12,000 - - - 24,000 Right of Way - - - - - Construction 100,000 - - - 100,000 112,000 - - - 124,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: No significant Impact Non-Capacity Replace approximately 170 LF of 12" and 20 LF of 8" vitrified clay sewer line in M St NE between Main Street and 1st St NE and replace approximately 100 LF of 8" PVC between 2nd and 3rd Street NE to repair a belly at the downstream end of the pipe in conjunction with street improvements. Progress Summary: Design is anticipated in 2022. Future Impact on Operating Budget: 134 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Rainier Ridge Pump Station Rehabilitation/Replacement Project No:cp2009 Project Type: Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue 15,228 499,772 2,900,000 - 3,415,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 15,228 499,772 2,900,000 - 3,415,000 Capital Expenditures: Design 15,228 499,772 220,000 - 735,000 Right of Way - - - - - Construction - - 2,680,000 - 2,680,000 15,228 499,772 2,900,000 - 3,415,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 2,900,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 2,900,000 Capital Expenditures: Design - - - - 220,000 Right of Way - - - - - Construction - - - - 2,680,000 - - - - 2,900,000 Grants / Other Sources: This project will not have a significant effect on operating budget. Non-capacity The Rainer Ridge Pump Station was constructed in 1980. Most of the property within its tributary basin has been fully developed, and the station has very little excess capacity. As such, there is a very short response time in the event of a pump failure, especially during peak use. Additionally, the PVC force main has had several breaks, and should be replaced. The initial phase of this project will examine the alternatives of rehabilitating the station, replacing major components, or replacing the entire station. The proposed funding assumes a complete replacement, and will be adjusted pending the alternatives analysis. Funding for this project was derived from the Sewer Pump Station Replacement/Improvement program (sebd05). Progress Summary: A consultant for the project has been selected, and design has begun on several replacement options. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 135 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 2nd Street SE Preservation Project No:CP2003 Project Type: Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue 3,121 150,000 146,879 - 300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 3,121 150,000 146,879 - 300,000 Capital Expenditures: Design 3,121 25,000 10,000 - 38,121 Right of Way - - - - Construction - 125,000 136,879 - 261,879 3,121 150,000 146,879 - 300,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 146,879 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 146,879 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 136,879 - - - - 146,879 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: No significant impact Non-capacity This project replaces approximately 450 LF of 8” concrete sewer line with 8” PVC and replaces 2 manholes as part of a street reconstruction project for 2nd Street SE between A Street SE and Auburn Way South. Progress Summary: City was awarded transportation grant funding in 2019 and the project design began in 2020. Construction is anticipated to begin in late 2021 and be completed in early 2022. Future Impact on Operating Budget: 136 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 2021 Sewer Repair and Replacement Project No:CP2010 Project Type: Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue 51,542 950,000 500,000 - 1,501,542 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 51,542 950,000 500,000 - 1,501,542 Capital Expenditures: Design 51,542 32,040 10,000 - 93,582 Right of Way - - - - - Construction - 917,960 490,000 - 1,407,960 51,542 950,000 500,000 - 1,501,542 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 500,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 500,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 490,000 - - - - 500,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project should slightly decrease the operating budget by correcting the problems that require operation staff's attention. Non-capacity This project plans to replace a total of approximately 2585 LF of 8”-10” diameter sewer line at 9 separate sites, and to complete 10 spot repairs. Progress Summary: Project design began in 2020. The project began construction in August 2021 and is anticipated be completed in early 2022. Future Impact on Operating Budget: 137 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 23rd SE Storm Improvements Project No:cp2126 Project Type: Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - - 15,000 150,000 15,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 15,000 150,000 15,000 Capital Expenditures: Design - - 15,000 15,000 15,000 Right of Way - - - - Construction - - - 135,000 - - - 15,000 150,000 15,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 165,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 165,000 Capital Expenditures: Design - - - - 30,000 Right of Way - - - - - Construction - - - - 135,000 - - - - 165,000 Grants / Other Sources: This project should slightly decrease the operating budget by correcting problems that require operation staff's attention. Non-capacity Along with the storm drainage and other facility improvements, replace approximately 320 LF of 8” clay pipe along K Street SE in its existing alignment with new 8” PVC. as well as replacing seven side sewers within the right of way that are connected to that line. Progress Summary: Design will begin in early 2022, with construction expected in 2023. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 138 City of Auburn Capital Facilities Plan SEWER FUND (461)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Regional Growth Center Access Improvements Project No:CP2110 Project Type: Project Manager:Seth Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Sewer Revenue - 10,000 - 100,000 10,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 10,000 - 100,000 10,000 Capital Expenditures: Design - 10,000 - 5,000 10,000 Right of Way - - - - - Construction - - - 95,000 - - 10,000 - 100,000 10,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Sewer Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 100,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - 95,000 - - - - 100,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project should slightly decrease the operating budget by correcting problems that require operation staff's attention. Non-capacity Along with the Intersection and other facility improvements, replace 200 LF of 8” concrete sewer with 8” PVC pipe in 3rd St NE between B St NE and Auburn Ave N. Progress Summary: Design will begin in 2021, with construction expected in 2023. Future Impact on Operating Budget: 139 City of Auburn Capital Facilities Plan 140 City of Auburn Capital Facilities Plan STORM DRAINAGE Current Facilities The City’s storm drainage service area encompasses the municipal boundaries of the City. The City’s drainage system consists of a combination of closed conveyance pipes and open ditch conveyance facilities, with seven pumping stations. Table SD-1 Facilities Inventory lists the facilities along with their current capacities and location. Level of Service (LOS) The City’s Comprehensive Drainage Plan summarizes the level of service (LOS), or design criteria, for the City’s storm drainage system. Generally, these standards represent a 25- year/24-hour design storm capacity. Capital Facilities Projects and Financing The City’s storm drainage facilities anticipate one capacity project in the amount of $88,750 and 24 non-capacity projects totaling $22,644,509 for a six-year planning expectation total of $22,733,259. Table SD-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for storm drainage facilities during the six years 2023 – 2028. 141 City of Auburn Capital Facilities Plan TABLE SD-1 Facilities Inventory Storm Drainage Facilities CONYEYANCE ASSETS Pipes 243 miles Ditches 40 miles Catch Basins 10,275 Manholes 3,024 Outfalls to Green River, White River and Mill Creek 66 Stormwater Ponds 167 CAPACITY PUMP STATIONS (GPM)LOCATION Brannan Park Pump Station #4 20,200 Brannan Park White River Pump Station 17,700 5000 block A Street SE Emerald Corp. Park Pump Station 6,500 C Street NE near 42nd Street M St SE Grade Separation 1,500 328 M St SE A Street SE Pump Station 1,380 A Street SE near SR-18 and BNRR overpass West Main Street Pump Station 1,200 1420 West Main Street Auburn Way S Pump Station #3 1,000 Auburn Way S near SR-18 and BNRR overpass 142 City of Auburn Capital Facilities Plan TABLE SD-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 147 37th St. NW Storm Improvement Capital Costs 88,750 - - - - - 88,750 Funding Sources: Storm Fund - - - - - - - Other -PSE 88,750 - - - - - 88,750 Subtotal, Capacity Projects: Capital Costs 88,750 - - - - - 88,750 Non-Capacity Projects: 148 Pipeline Repair & Replacement Program Capital Costs 125,000 1,250,000 125,000 1,250,000 125,000 1,250,000 4,125,000 Funding Sources: Storm Fund 125,000 1,250,000 125,000 1,250,000 125,000 1,250,000 4,125,000 Bond Proceeds - - - - - - - 149 2021 Storm Renewal & Replacement Project Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Pierce Co. Opportunity Fund - - - - - - - Bond Proceeds - - - - - - - 150 30th Street NE Area Flooding, Phase 3 Capital Costs - - - 673,000 2,244,000 - 2,917,000 Funding Sources: Storm Fund - - - 673,000 2,244,000 - 2,917,000 Bond Proceeds - - - - - - - 151 Street Utility Improvements Capital Costs 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 Funding Sources: Storm Fund 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 Bond Proceeds - - - - - - - 152 2021 Local Street Preservation - G Street SE and Riverwalk/Forest Ridge Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - 153 4th Street SE Preservation Capital Costs 946,000 - - - - - 946,000 Funding Sources: Storm Fund 946,000 - - - - - 946,000 Bond Proceeds - - - - - - - CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 143 City of Auburn Capital Facilities Plan TABLE SD-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 154 Comprehensive Storm Drainage Plan Update Capital Costs 140,000 50,000 20,000 - - - 210,000 Funding Sources: Storm Fund 140,000 50,000 20,000 - - - 210,000 Bond Proceeds - - - - - - - 155 Vegetation Sorting Facility Capital Costs 966,000 - - - - - 966,000 Funding Sources: Storm Fund 966,000 - - - - - 966,000 Bond Proceeds - - - - - - - 156 Regional Growth Center Access Capital Costs 20,000 140,000 - - - - 160,000 Funding Sources: Storm Fund 20,000 140,000 - - - - 160,000 Bond Proceeds - - - - - - - 157 North Airport Area Storm Improvements Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - 158 D St. SE Storm Improvement Capital Costs 458,000 1,794,260 - - - - 2,252,260 Funding Sources: Storm Fund 458,000 1,794,260 - - - - 2,252,260 Bond Proceeds - - - - - - - 159 S. 330th St. & 46th Pl. S. Storm Improvement Capital Costs 302,369 - - - - - 302,369 Funding Sources: Storm Fund 302,369 - - - - - 302,369 Bond Proceeds - - - - - - - 160 23rd Street SE Storm Improvement Capital Costs 124,000 613,880 - - - - 737,880 Funding Sources: Storm Fund 124,000 613,880 - - - - 737,880 Bond Proceeds - - - - - - - 161 Riverw alk Drive SE Non-Motorized Improvements Capital Costs 505,000 - - - - - 505,000 Funding Sources: Storm Fund 505,000 - - - - - 505,000 Bond Proceeds - - - - - - - 162 S. 314th St. & 54th Ave S. Storm Improvement Ph. 1 Capital Costs 102,000 416,000 - - - - 518,000 Funding Sources: Storm Fund 102,000 416,000 - - - - 518,000 Bond Proceeds - - - - - - - 144 City of Auburn Capital Facilities Plan TABLE SD-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 163 S. 314th St. & 54th Ave S. Storm Improvement Ph. 2 Capital Costs - 115,000 281,000 - - - 396,000 Funding Sources: Storm Fund - 115,000 281,000 - - - 396,000 Bond Proceeds - - - - - - - 164 M Street NE Widening Capital Costs 50,000 - 350,000 - - - 400,000 Funding Sources: Storm Fund 50,000 - 350,000 - - - 400,000 Bond Proceeds - - - - - - - 165 West Main Street Pump Station Upgrade Capital Costs - 850,000 2,914,000 - - - 3,764,000 Funding Sources: Storm Fund - 850,000 2,514,000 - - - 3,364,000 King Co. Opportunity Fund - - 400,000 - - - 400,000 166 Manhole & Catchbasin Frame and Grate Replacement Capital Costs 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Funding Sources: Storm Fund 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Bond Proceeds - - - - - - - 167 Auburn Way North and 1st St NE Signal Replacement Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - 168 Lead Service Line Replacement Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - 169 North Airport Stormwater Improvement, Phase 2 Capital Costs 1,235,000 - - - - - 1,235,000 Funding Sources: Storm Fund 1,235,000 - - - - - 1,235,000 Bond Proceeds - - - - - - - 170 Arterial and Pedestrian Bike Safety Capital Costs 30,000 - - - - - 30,000 Funding Sources: Storm Fund 30,000 - - - - - 30,000 Bond Proceeds - - - - - - - 171 R St SE Improvements Capital Costs 40,000 30,000 1,080,000 - - - 1,150,000 Funding Sources: Storm Fund 40,000 30,000 1,080,000 - - - 1,150,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 5,423,369 5,589,140 5,100,000 2,253,000 2,699,000 1,580,000 22,644,509 145 City of Auburn Capital Facilities Plan TABLE SD-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2022 2023 2024 2025 2026 2027 Total SUMMARY: CAPITAL COSTS Capacity Projects 88,750 - - - - - 88,750 Non-Capacity Projects 5,423,369 5,589,140 5,100,000 2,253,000 2,699,000 1,580,000 22,644,509 Total Costs 5,512,119 5,589,140 5,100,000 2,253,000 2,699,000 1,580,000 22,733,259 FUNDING SOURCES: Storm Fund 5,423,369 5,589,140 4,700,000 2,253,000 2,699,000 1,580,000 22,244,509 King Co. Opportunity Fund - - 400,000 - - - 400,000 Other -PSE 88,750 - - - - - 88,750 Total Funding 5,512,119 5,589,140 5,100,000 2,253,000 2,699,000 1,580,000 22,733,259 146 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:37th St. NW Storm Improvement Project No:cp1724 Project Type:Capacity Project Manager:Luis Barba Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue 915 90,100 - - 91,015 PSE - - 88,750 - 88,750 Bond Proceeds - - - - - King County Flood Control District Grant 47,977 162,023 - - 210,000 48,892 252,123 88,750 - 389,765 Capital Expenditures: Design 48,892 10,000 - - 58,892 Right of Way - - - - - Construction - 242,123 88,750 - 330,873 48,892 252,123 88,750 - 389,765 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - - PSE - - - - 88,750 Bond Proceeds - - - - - King County Flood Control District Grant - - - - - - - - - 88,750 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 88,750 - - - - 88,750 Grants / Other Sources: King County Opportunity Grant Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Phase 1: Phase 1 will address storm improvements in the ROW. Project will eliminate a direct connection to the adjacent side channel to Mill Creek and tie into the main storm system. Phase 2: Project will replace the damaged and eroded existing pipes spanning the PSE substation access driveway in vicinity of 37th St NE near I St NW. During periods of prolonged heavy flows, this side channel to Mill Creek exceeds the capacity of the combined culverts and backs up onto 37th St. NW and also impacts the Interurban Trail. Comprehensive Plan Project #2 Progress Summary: The City has been awarded a $210,000 King County Opportunity Grant for the overall project. Phase 1 will be bid and constructed in 2021 using storm funds only. Ongoing discussions with PSE continue for phase 2 with possible construction in 2022. Future Impact on Operating Budget: None 147 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Pipeline Repair & Replacement Program Project No:sdbd03 Project Type:Non-Capacity Project Manager:TBD Description: Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue 906,192 169,000 125,000 1,250,000 1,200,192 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 906,192 169,000 125,000 1,250,000 1,200,192 Capital Expenditures: Design 61,521 169,000 125,000 - 355,521 Right of Way - - - - - Construction 844,671 - - 1,250,000 844,671 906,192 169,000 125,000 1,250,000 1,200,192 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 125,000 1,250,000 125,000 1,250,000 4,125,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 125,000 1,250,000 125,000 1,250,000 4,125,000 Capital Expenditures: Design 125,000 - 125,000 - 375,000 Right of Way - - - - - Construction - 1,250,000 - 1,250,000 3,750,000 125,000 1,250,000 125,000 1,250,000 4,125,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: This program provides funding for projects involving replacement of existing infrastructure. These projects support street repairs and other utility replacement programs, requiring coordination. Comprehensive Plan Project #1. Progress Summary: In 2021, this program transferred funding to the 4th Street (cp2102 - $75K), the Arterial Pedestrian and Bike Safety Project (cp2119 - $35K) and R St SE Improvements (cp2116 - 70K). Future Impact on Operating Budget: Repair and replacement of aging infrastructure should reduce operating costs. 148 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:2021 Storm Renewal & Replacement Project Project No:cp2017 Project Type:Non-Capacity Project Manager:Luis Barba Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue 46,850 819,149 10,000 - 875,999 Grants- Secured (Fed,State,Local)- - - - Bond Proceeds - - - - - Pierce County FCZD Opportunity Fund - 74,000 - - 74,000 46,850 893,149 10,000 - 949,999 Capital Expenditures: Design 45,944 70,000 - - 115,944 Right of Way 906 - - - 906 Construction - 823,149 10,000 - 833,149 46,850 893,149 10,000 - 949,999 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Pierce County FCZD Opportunity Fund - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Lower maintenance costs due to reducing stormwater runoff onto roadways and sidewalks. This project will provide improvements to the existing storm drainage system to eliminate known drainage issues and reduce maintenance at eight sites: Eastpoint Storm Pond, Mountain View Cemetery, SE 304th Street at 108th Ave SE, S 316th Street near 55th Ave S, Lakeland Hills Way at Oravetz Drive, Riverwalk Drive at Howard Rd, 2nd St NW at H St. NW and the south side of Mill Pond Drive near Oravetz Rd. Progress Summary: Design in 2020/2021, construction beginning fall 2021 with completion in early 2022. Future Impact on Operating Budget: 149 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 3 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - 673,000 2,244,000 - 2,917,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 673,000 2,244,000 - 2,917,000 Capital Expenditures: Design - 673,000 - - 673,000 Right of Way - - - - - Construction - - 2,244,000 - 2,244,000 - 673,000 2,244,000 - 2,917,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will reduce potential flooding in C St. NE by redirecting wet weather high flows southward to the 42-inch diameter (Phase 1) storm drain in 30th St. NE. By redirecting the C St. NE drainage into the Brannan Park system, these flows would no longer be affected by high water levels in Mill Creek. To avoid deepening the Phase 1 gravity line (and extensive retrofits to the Brannan Park pump station), this project would include a wet weather pump station and force main connection to 30th St. NE. The upgraded 42-inch diameter pipe in 30th St. NE would have sufficient capacity for these additional flows. Key components of Phase 3 include: Wet weather pump station (estimated capacity of 4.5 to 7 cfs), 1,730 feet of 15-inch diameter force main; Diversion structure in C St. NE for pump station. Comprehensive Plan Project #4B. Progress Summary: This project was moved from 2023-2024 to 2025-2026 to balance storm funding requirements throughout the capital facilities plan. Future Impact on Operating Budget: Impacts are expected to increase due to high level of maintenance required for pump stations. 150 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Street Utility Improvements Project No:sdbd04 Project Type:Non Capacity Project Manager:TBD Description: Activity: Previous 2 years 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 90,000 250,000 250,000 340,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 90,000 250,000 250,000 340,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 90,000 250,000 250,000 340,000 - 90,000 250,000 250,000 340,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 250,000 250,000 250,000 250,000 1,500,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 250,000 250,000 250,000 250,000 1,500,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 250,000 250,000 250,000 250,000 1,500,000 250,000 250,000 250,000 250,000 1,500,000 Storm system repair and replacements in coordination with transportation projects. Comprehensive Plan Project #12. Progress Summary: In 2021, this program transferred funding to the North Airport Stormwater Improvement, Phase 2 (cp2118 - $120K). Future Impact on Operating Budget: No significant Impact. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 151 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 2021 Local Street Preservation - G Street SE and Riverwalk/Forest Ridge Project No:cp2019 Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue 24,631 465,369 10,000 - 500,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 24,631 465,369 10,000 - 500,000 Capital Expenditures: Design 24,631 13,709 - - 38,340 Right of Way - - - - - Construction - 451,660 10,000 - 461,660 24,631 465,369 10,000 - 500,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This improvement will replace undersized and deteriorated storm line with the street project. Approximately 1150 feet of 12" storm line with catchbasins and manholes will be constructed along G St. SE between East Main and 4th St. SE. and in the Forest Ridge neighborhood near 24th St. SE and Forest Ridge Rd. Progress Summary: Project is in construction. Anticipated to be completed in early 2022. Future Impact on Operating Budget: Repair and replacement of aging infrastructure should reduce operating costs. 152 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: 4th Street SE Preservation Project No:cp2102 Project Type: Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 75,000 946,000 - 1,021,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 75,000 946,000 - 1,021,000 Capital Expenditures: Design - 75,000 20,000 - 95,000 Right of Way - - - - Construction - - 926,000 - 926,000 - 75,000 946,000 - 1,021,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 946,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 946,000 Capital Expenditures: Design - - - - 20,000 Right of Way - - - - - Construction - - - - 926,000 - - - - 946,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Non-capacity Along with the street reconstruction and other utility improvements, install 1680 LF existing 8” storm with 12” storm, 165 LF of new and replaced 15", 205 LF of new 14" DI, 130 LF of new 16" and 23 LF of replaced 30" along 4th St SE from Auburn Way South to L St SE. Progress Summary: Design started in 2021. Design currently at 90% with construction bid expected in December 2021. Future Impact on Operating Budget: None. 153 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Comprehensive Storm Drainage Plan Update Project No:sdbd16 Project Type:Non-Capacity Project Manager:Tim Carlaw Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 40,000 140,000 50,000 180,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 40,000 140,000 50,000 180,000 Capital Expenditures: Design - 40,000 140,000 50,000 180,000 Right of Way - - - - - Construction - - - - - - 40,000 140,000 50,000 180,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 20,000 - - - 210,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 20,000 - - - 210,000 Capital Expenditures: Design 20,000 - - - 210,000 Right of Way - - - - - Construction - - - - - 20,000 - - - 210,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: None This project will prepare an update to the City's Storm Drainage Comprehensive Plan to be adopted by City Council as part of the City's overall Comprehensive Plan to be completed by June 2024. City staff will prepare portions of the plan and will engage consultants to complete some of the tasks including hydraulic modeling, financial analysis, and cost estimation. Comprehensive Plan Project #9. Progress Summary: The deadline for completion of the City's Comprehensive Plan has been extended from June 2023 to June 2024. Preliminary project planning began in 2020. Future Impact on Operating Budget: 154 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:Vegetation Sorting Facility Project No:sdbd12 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - - 966,000 - 966,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 966,000 - 966,000 Capital Expenditures: Design - - 64,000 - 64,000 Acquisition - - 750,000 - 750,000 Construction/Equipment - - 152,000 - 152,000 - - 966,000 - 966,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 966,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 966,000 Capital Expenditures: Design - - - - 64,000 Acquisition - - - - 750,000 Construction/Equipment - - - - 152,000 - - - - 966,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will prepare an evaluation of the benefits and costs of acquiring property to use as a vegetation sorting facility prior to disposal or reuse of materials from storm drainage maintenance activities (e.g., pond and ditch cleaning). The evaluation will identify potential use of a sorting facility by other City departments and by neighboring jurisdictions as a regional facility. If evaluation shows a reasonable benefit/cost ratio, the project implementation proceed with property acquisition and site improvements to construct the vegetation sorting facility. Cost includes bin barriers and sorting equipment to facilitate materials handling and separation. Comprehensive Plan Project #10. Progress Summary: Due to lack of staff resources due to Covid, the evaluation and property purchase has been deferred to 2022. Future Impact on Operating Budget: Overall operating costs should decrease as a result of improved efficiency from the sorting facility. 155 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Regional Growth Center Access Project No:cp2110 Project Type: Project Manager:Seth Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 15,000 20,000 140,000 35,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 15,000 20,000 140,000 35,000 Capital Expenditures: Design - 15,000 20,000 - 35,000 Right of Way - - - - Construction - - - 140,000 - - 15,000 20,000 140,000 35,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 160,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 160,000 Capital Expenditures: Design - - - - 20,000 Right of Way - - - - - Construction - - - - 140,000 - - - - 160,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Non-capacity Along with the street reconstruction and other utility improvements, replace approximately 463 LF of existing 8” storm with 12” storm along Auburn Ave and 3rd St NE alignments. Also install approximately 80 LF new 12” storm in this area for local inflow. Install approximately 200 LF new 12” storm in 4th St NE between Auburn Way North and Auburn Ave for local inflow. Progress Summary: Design is underway in 2021 with construction expected in 2023. Future Impact on Operating Budget: None. 156 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:North Airport Area Storm Improvements Project No:cp2026 Project Type:Non-Capacity Project Manager:Seth Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue 10,903 150,000 10,000 - 170,903 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 10,903 150,000 10,000 - 170,903 Capital Expenditures: Design 10,903 - - - 10,903 Right of Way - - - - - Construction - 150,000 10,000 - 160,000 10,903 150,000 10,000 - 170,903 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 10,000 - - - - 10,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will reconfigure the storm lines that flow into “Pond I”, an existing storm pond on Airport property at the northeast end of the runway. The specific items of work include removing existing storm pipe, installing approximately 470 linear feet of new 12-inch and 30-inch storm pipe, and restoring existing pavement and landscaping. The purpose of this work is to better utilize the existing storage capacity available to the City’s storm system on 30th St NE which will help reduced localized flooding around northern airport hangars during heavy rain events. This project will also allow the City to eventually eliminate one or more of the existing storm ponds at the north end of the Airport property in future. Progress Summary: Project completed in 2021. Future Impact on Operating Budget: Reduce maintenance costs and airport building damage due to flooding. 157 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:D St. SE Storm Improvement Project No:cp2125 Project Type:Non-Capacity Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 50,000 458,000 1,794,260 508,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 50,000 458,000 1,794,260 508,000 Capital Expenditures: Design - 50,000 458,000 - 508,000 Right of Way - - - - - Construction - - - 1,794,260 - - 50,000 458,000 1,794,260 508,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 2,252,260 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 2,252,260 Capital Expenditures: Design - - - - 458,000 Right of Way - - - - - Construction - - - - 1,794,260 - - - - 2,252,260 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will Install approximately 990 L.F. 30-inch, 630 L.F. 24-inch and 1230 L.F. 12-inch of new gravity storm drain pipe to convey the 25-year flow along D Street SE from a flooding area that caused by failing dry wells located near the intersection of D Street SE and 25th Street SE. Additionally, the project will install approximately 380 LF 12-inch gravity storm drain pipe in F Street SE from 27th to 26th Street SE to complete a missing line connection. Both of these systems direct flows to the existing 21st Street storm pond. Comprehensive Plan Project #7. Progress Summary: Charter completed in 2021, design in 2022, construction in 2023. Construction costs escalated by 3% for delaying construction from 2022 to 2023. Future Impact on Operating Budget: Operating expenses are expected to decrease with the elimination of existing drywells. 158 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:S. 330th St. & 46th Pl. S. Storm Improvement Project No:cp2018 Project Type:Non-Capacity Project Manager:Barba Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 45,000 302,369 - 347,369 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 45,000 302,369 - 347,369 Capital Expenditures: Design - 45,000 5,000 50,000 Easement - - 5,000 - 5,000 Construction - - 292,369 - 292,369 - 45,000 302,369 - 347,369 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 302,369 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 302,369 Capital Expenditures: Design - - - - 5,000 Easement - - - - 5,000 Construction - - - - 292,369 - - - - 302,369 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: As part of the City's efforts to improve the drainage system in the West Hill annexation area, this project construct improvements near S. 330th Street and 46th Place S. where public storm drainage currently discharges within a large open ditch. The improvement will re-route the drainage within the right-of-way to the existing outfall. Comprehensive Plan Project #5A. Progress Summary: Project design underway in 2020. The project is delayed due to environmental permitting. Anticipated construction in 2022. Future Impact on Operating Budget: None 159 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:23rd Street SE Storm Improvement Project No:cp2126 Project Type:Non-Capacity Project Manager:Jai Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 50,000 124,000 613,880 174,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 50,000 124,000 613,880 174,000 Capital Expenditures: Design - 50,000 124,000 - 174,000 Right of Way - - - - - Construction - - - 613,880 - - 50,000 124,000 613,880 174,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 737,880 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 737,880 Capital Expenditures: Design - - - - 124,000 Right of Way - - - - - Construction - - - - 613,880 - - - - 737,880 Grants / Other Sources: This project will improve existing drainage conditions in vicinity of 23rd St. SE & K St. SE. In the 2015 Comprehensive Storm Drainage Plan, the project was divided into two phases: Phase 1 includes installation of 600 LF of 15-inch line along K St. SE from 23rd St. SE to 21st St. SE to alleviate flooding associated with the pedestrian entrance to Pioneer Elementary School, and Phase 2 includes installation of 560 LF of 18-inch line along 23rd St SE from F St. SE to K St. SE to convey flows to the F St. SE trunkline for discharge into the 21st St SE regional infiltration facility. Phases 1 and 2 will be constructed as a single project. Comprehensive Plan Project #8 (Phase 1+2). Progress Summary: In 2020, the project implementation has been moved from 2020 to 2021 to coordinate with the redevelopment of Pioneer Elementary School. Design will begin in early 2022, with construction expected in 2023. Construction costs were escalated 3% from 2022 to 2023. Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 160 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:Riverwalk Drive SE Non-Motorized Improvements Project No:cp2121 Project Type:Non-Capacity Project Manager:Jeff Bender Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 17,000 505,000 - 522,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 17,000 505,000 - 522,000 Capital Expenditures: Design - 17,000 51,000 - 68,000 Right of Way - - - - - Construction - - 454,000 - 454,000 - 17,000 505,000 - 522,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 505,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 505,000 Capital Expenditures: Design - - - - 51,000 Right of Way - - - - - Construction - - - - 454,000 - - - - 505,000 This project will construct large diameter storm piping to replace the existing roadside ditch, and expand the Riverwalk ponds to accommodate increased capacity due to the lost infiltration of the upstream ditch along Riverwalk Drive. The project will be implemented as part of the transportation project that will construct sidewalks along the east side of Riverwalk Drive SE from Howard Road and Auburn Way South. Progress Summary: Design beginning in 2021. Construction 2023. Future Impact on Operating Budget: Maintenance costs should decrease as a result of the project. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 161 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:S. 314th St. & 54th Ave S. Storm Improvement Ph. 1 Project No:sdbd19 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - - 102,000 416,000 102,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 102,000 416,000 102,000 Capital Expenditures: Design - - 102,000 - 102,000 Right of Way - - - - - Construction - - - 416,000 - - - 102,000 416,000 102,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 518,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 518,000 Capital Expenditures: Design - - - - 102,000 Right of Way - - - - - Construction - - - - 416,000 - - - - 518,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: As part of the City's efforts to improve the drainage system in the West Hill annexation area, this project will construct improvements near S 314th Street. and 54th Avenue S. to redirect flows and implement Low Impact Development (LIID) techniques. Comprehensive Project #5B Phase 1. Progress Summary: Charter will be completed in 2021. Design will be in 2022, construction in 2023. Future Impact on Operating Budget: None 162 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:S. 314th St. & 54th Ave S. Storm Improvement Ph. 2 Project No:sdbd22 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - - - 115,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 115,000 - Capital Expenditures: Design - - - 89,000 - Right of Way - - - 26,000 - Construction - - - - - - - - 115,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 281,000 - - - 396,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 281,000 - - - 396,000 Capital Expenditures: Design - - - - 89,000 Right of Way - - - - 26,000 Construction 281,000 - - - 281,000 281,000 - - - 396,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: As part of the City's efforts to improve the drainage system in the West Hill annexation area, this project will construct improvements near S 314th Street and 54th Avenue S to route the public storm drainage through a new easement and pipe to the downstream system. Comprehensive Drainage Plan Project #5B Phase 2. Progress Summary: Future Impact on Operating Budget: None 163 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:M Street NE Widening Project No:sdbd20 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 50,000 - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 350,000 - - - 400,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 350,000 - - - 400,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction 350,000 - - - 350,000 350,000 - - - 400,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: None This project will replace approximately 450 LF of undersized and deteriorated storm drain pipe and install approximately 300 feet of new storm drain pipe with catch basins and manholes. The project will be implemented as part of the transportation project: M Street NE Widening from E. Main Street to 4th Street NE. Progress Summary: Project scope developed in 2020. Future Impact on Operating Budget: 164 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:West Main Street Pump Station Upgrade Project No:sdbd11 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - - - 850,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 850,000 - Capital Expenditures: Design - - - 850,000 - Right of Way - - - - - Construction - - - - - - - - 850,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 2,514,000 - - - 3,364,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - King County Opportunity Fund 400,000 - - - 400,000 2,914,000 - - - 3,764,000 Capital Expenditures: Design - - - - 850,000 Right of Way - - - - - Construction 2,914,000 - - - 2,914,000 2,914,000 - - - 3,764,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will upgrade the existing pump station by providing a redundant pump, force main, and outlet to meet level of service goals. Comprehensive Plan Project #1. Progress Summary: In 2020, project implementation was moved from 2022-2023 to 2023-2024 for balance funding in the capital facilities plan period. Future Impact on Operating Budget: None 165 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:Manhole & Catchbasin Frame and Grate Replacement Project No:sdbd21 Project Type:Non-Capacity (Repair and Replacement) Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 80,000 80,000 80,000 160,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 80,000 80,000 80,000 160,000 Capital Expenditures: Design - 8,000 8,000 8,000 16,000 Right of Way - - - - - Construction - 72,000 72,000 72,000 144,000 - 80,000 80,000 80,000 160,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 80,000 80,000 80,000 80,000 480,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 80,000 80,000 80,000 80,000 480,000 Capital Expenditures: Design 8,000 8,000 8,000 8,000 48,000 Right of Way - - - - - Construction 72,000 72,000 72,000 72,000 432,000 80,000 80,000 80,000 80,000 480,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Reduced risk of road hazard claims. As manholes & catchbasins age and their condition deteriorates, frame and grates can become loose and/or misoriented, or due to age are not meeting standards. This annual project will replace approximately 50 storm manhole and catchbasin frame and grates to maintain access to the storm system and to decrease the likelihood of the manholes becoming road hazards. In some years, this replacement will be as a stand-alone project, and in some years many of these replacements will be in conjunction with other City capital projects. Progress Summary: New program Future Impact on Operating Budget: 166 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:Auburn Way North and 1st St NE Signal Replacement Project No:cp1927 Project Type:Non-Capacity Project Manager:Matt Larson Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 190,000 10,000 - 200,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 190,000 10,000 - 200,000 Capital Expenditures: Design - - - - Right of Way - - - - Construction - 190,000 10,000 - 200,000 - 190,000 10,000 - 200,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: This project addresses an existing storm-to-sanitary sewer cross connection(s) at the intersection of Auburn Way North and 1st Street SE with installation of new 12" storm pipes and manholes. The project is being implemented with the transportation project that is replacing the traffic signal and curb ramps at the intersection. Progress Summary: Construction will be completed in early 2022. Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 167 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Lead Service Line Replacement Project No:CP1922 Project Type: Project Manager:Carter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 140,000 10,000 - 150,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 140,000 10,000 - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - Construction - 140,000 10,000 - 150,000 - 140,000 10,000 - 150,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Non-capacity Along with the street reconstruction resulting from Water Utility improvements, replace approximately 673 LF of 12" DI storm at the following locations: 3rd at D St NE, 3rd at E St NE, 2nd St NE at Auburn Ave, 2nd at E St NE, 1st at D St NE, 1st at E St NE, D St SE between 2nd and 4th St SE, and B St SE at 14th St SE. Progress Summary: Design completed in 2021, construction to be completed in 2022. Future Impact on Operating Budget: None. 168 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:North Airport Stormwater Improvement, Phase 2 Project No:cp2118 Project Type:Non-Capacity Project Manager:Wickstrom Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 135,000 1,235,000 - 1,370,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 135,000 1,235,000 - 1,370,000 Capital Expenditures: Design - 135,000 135,000 - 270,000 Right of Way - - - - - Construction - - 1,100,000 - 1,100,000 - 135,000 1,235,000 - 1,370,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 1,235,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,235,000 Capital Expenditures: Design - - - - 135,000 Right of Way - - - - - Construction - - - 1,100,000 - - - - 1,235,000 This project will eliminate Pond F and underground Pond G within subsurface chambers. Storm modeling for the north auburn airport area has determined that overall storage capacity is sufficient and will eliminate the existing bird netting and vegetation management for these two ponds. Progress Summary: Consultant scope and fee negotiation is in process. Design anticipated to begin September 2021. Construction in 2022. Future Impact on Operating Budget: Eliminating Pond F and undergrounding Pond G will significantly reduce the costs to maintain the bird netting and vegetation management within the ponds. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 169 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:Arterial and Pedestrian Bike Safety Project No:cp2119 Project Type:Non-Capacity Project Manager:Aleksey Koshman Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 5,000 30,000 - 35,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 5,000 30,000 - 35,000 Capital Expenditures: Design - 5,000 - - 5,000 Right of Way - - - - - Construction - - 30,000 - 30,000 - 5,000 30,000 - 35,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue - - - - 30,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 30,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 30,000 - - - - 30,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Install 90 LF of 12" PVC storm drain between two catch basins on the east side A St SE near the Oldcastle plant. Progress Summary: Design 2021, construction 2022. Future Impact on Operating Budget: None. 170 City of Auburn Capital Facilities Plan STORM DRAINAGE FUND (462)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title:R St SE Improvements Project No:cp2116 Project Type:Non-Capacity Project Manager:Barba Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Storm Revenue - 30,000 40,000 30,000 70,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 30,000 40,000 30,000 70,000 Capital Expenditures: Design - 30,000 40,000 30,000 70,000 Right of Way - - - - - Construction - - - - - - 30,000 40,000 30,000 70,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Storm Revenue 1,080,000 - - - 1,150,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,080,000 - - - 1,150,000 Capital Expenditures: Design - - - - 70,000 Right of Way - - - - - Construction 1,080,000 - - 1,080,000 1,080,000 - - - 1,150,000 None. Along with the street reconstruction and other utility improvements, replace approximately 2,800 LF of 8" and 10" concrete pipe with 12" pipe between 28th and 33rd St SE. Add 152 LF of 12" storm pipe and 8 new catch basins between 25th St SE and 28th St SE. Progress Summary: Design is underway in 2021 with construction expected in 2024. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 171 City of Auburn Capital Facilities Plan 172 City of Auburn Capital Facilities Plan PARKS, ARTS AND RECREATION Current Facilities The City of Auburn’s Park system consists of a total of 953.39 acres of neighborhood and community parks, special use areas, open space and linear parks (trails). Table PR – 1 “Facilities Inventory” lists all park and recreation land in the City’s park system along with their current capacity and location. Level of Service (LOS) The current LOS provided by the City’s park system represents the existing inventory of City- owned park acres divided by the 2022 projected City population of 85,041. This equates to 0.77 acres per 1,000 population for neighborhood parks, 2.80 acres per 1,000 population for community parks, 0.20 acres for linear parks, 4.56 acres for open space, and 3.03 acres for special use areas. The proposed LOS provided by the City’s park system represents the planned 2027 inventory of City-owned park acres divided by the 2027 projected City population of 89,379. This equates to 0.83 acres per 1,000 population for neighborhood parks, 3.12 acres per 1,000 population for community parks, 0.23 acres per 1,000 population for linear parks, 4.34 acres per 1,000 population for open space, and 2.85 acres per 1,000 population for special use areas. Capital Facilities Projects and Financing Parks and Recreation facilities include eleven capacity projects at a cost of $15,163,850 and four non-capacity projects totaling $740,000 for a 6-year planning total of $15,903,850. Table PR – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table PR – 3 shows, operating budget impacts of $108,000 are forecasted for parks and recreation facilities during the six years 2023 – 2028. 173 City of Auburn Capital Facilities Plan TABLE PR-1 Facilities Inventory Parks, Arts and Recreation, Land CAPACITY FACILITY (Acres)LOCATION Neighborhood Parks: Existing Inventory: 21st Street Playground 0.17 405 21st St. SE Auburndale Park 9.74 31802 108th Ave. SE Ballard Park 0.68 1612 37th Way SE Cameron Park 3.85 3727 Lemon Tree Lane Cedar Lane Park 8.36 1002 25th St. SE Dorothy Bothell Park 4.35 1087 Evergreen Way SE Dykstra Park 1.67 1487 22nd St. NE Forest Villa mini-park 0.21 1647 Fir St. SE Gaines Park 1.33 1008 Pike St. NW Indian Tom Park 0.42 1316 6th St. NE Jornada Park 1.89 1433 U Ct. NW Kersey 3 Park A 2.73 5480 Charlotte Ave. SE Kersey 3 Park B 0.79 5530 Udall Ave. SE Lakeland Hills Park 5.06 1401 Evergreen Way SE Lea Hill Courts 1.18 32121 105th Pl. SE Lewis Lake Nature Park 9.25 32054 58th Ave. S Riversands Park 1.76 5014 Pike St NE Rotary Park 3.89 2635 Alpine St. NE Scootie Brown Park 1.68 1403 Henry Rd. NE Shaughnessy Park 3.46 3302 21st St. SE Terminal Park 1.22 1292 C St. SE Village Square 1.10 12111 SE 310th St. Total Neighborhood Parks 64.79 Proposed Capacity Projects: Auburndale II Park 9.35 29700 118th Street SE Total Proposed Capacity Projects 9.35 2026 Projected Inventory Total - Neighborhood Parks -74.14 Community Parks: Existing Inventory: Brannan Park 21.68 1019 28th St. NE Fulmer Field 5.04 1101 5th St. NE Game Farm Park 57.20 3030 R St. SE Game Farm Wilderness Park 48.50 2407 Stuck River Dr. SE GSA Park 5.31 413 15th St. SW Isaac Evans Park 19.87 29627 Green River Road NE Lea Hill Park 5.26 31693 124th Ave. SE Les Gove Park 26.07 910 9th St. SE Mill Pond 4.20 4582 Mill Pond Dr, SE Roegner Park 19.22 601 Oravetz Road Sunset Park 15.15 1420 69th St SE Veteran's Memorial Park 7.67 405 E St. NE Total Community Parks 235.17 Proposed Capacity Projects: 104th Avenue SE 14.73 31495 104th Ave. SE Jacobson Tree Farm 29.30 29387 132nd Ave SE Total Proposed Capacity Projects 44.03 2026 Projected Inventory Total - Community Parks -279.20 174 City of Auburn Capital Facilities Plan TABLE PR-1 (continued) Linear Parks: Existing Inventory: Interurban Trail 9.14 804 West Main St. Lake Tapps Parkway Trail 2.36 1420 69th St SE Lakeland Hills Trail 1.66 1087 Evergreen Way SE Reddington Levee Trail 2.50 1019 28th St NE White River Trail 0.93 601 Oravetz St. NE Total Linear Parks 16.59 Proposed Capacity Projects: Green River Trail 0.83 277th to Reddington Levee Trail Jacobsen Tree Farm to Green River Trail 2.75 White River Trail Extension 0.05 Total Proposed Capacity Projects 3.63 2026 Projected Inventory Total - Linear Parks -20.22 Special Use Areas: Existing Inventory: Auburn Environmental Park 16.84 413 Western Ave NW B Street Plaza 0.10 148 East Main St. Bicentennial Park 1.07 502 Auburn Way S. Centennial Viewpoint Park 0.70 402 Mountain View Dr. City Hall Plaza 1.10 25 West Main St. Clark Plaza 0.25 1420 Auburn Way N. Community Garden A 1.04 1030 8th St. NE Fenster/Green River Access 12.58 10502 Auburn Black Diamond Road Golf Course 139.71 29630 Green River Road SE Mountain View Cemetery 60.00 2020 Mountain View Dr. Olson Canyon Farmstead 20.00 28728 Green River Road Pioneer Cemetery 0.76 802 Auburn Way N, Plaza Park 0.19 2 West Main St. Slaughter Memorial 0.02 2988 Auburn Way N. Total Special Use Areas 254.36 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2026 Projected Inventory Total - Special Use Areas -254.36 Open Space Areas: Existing Inventory: Auburn Environmental Park Open Space 190.91 413 Western Ave. NW Clark Property 26.68 TBD Game Farm Open Space 26.00 3030 R St. SE Golf Course Open Space 40.98 29630 Green River Road SE Lakeland Hills Nature Area 46.07 500 182nd Ave. S Olson Canyon Open Space 47.00 28728 Green River Road Qares Property 0.99 TBD Riverpoint Open Space 3.85 1450 32nd St. NE Total Open Space Areas 382.48 Proposed Capacity Projects: West Hill Park Open Space 5.00 TBD Total Proposed Capacity Projects 5.00 2026 Projected Inventory Total - Open Space Areas -387.48 175 City of Auburn Capital Facilities Plan TABLE PR-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 178 Park Acquisitions/Development Capital Costs 30,000 50,000 125,000 125,000 125,000 125,000 580,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - Bond Proceeds - - - - - - - KC Prop 2 30,000 50,000 125,000 125,000 125,000 125,000 580,000 179 Jacobsen Tree Farm Development Capital Costs 2,915,050 2,500,000 - 5,000,000 - - 10,415,050 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - 1,000,000 - - 1,000,000 KC Prop 2 333,500 - - - - - 333,500 Other (TBD)- 2,500,000 - 2,000,000 - - 4,500,000 Park Impact Fees 2,581,550 - - 2,000,000 - - 4,581,550 180 West Hill Park Acquisition and Development Capital Costs 750,000 1,000,000 - - - - 1,750,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)400,000 500,000 - - - - 900,000 Park Impact Fees 350,000 500,000 - - - - 850,000 181 Game Farm Park Improvements Capital Costs 150,000 - - - - - 150,000 Funding Sources: Park Mitigation Fees - - - - - - - Grants (Fed,State,Local)- - - - - - - REET 1 - - - - - - - Park Impact Fees 150,000 - - - - - 150,000 182 Auburndale Park Capital Costs 100,000 - - - - - 100,000 Funding Sources: Fund Balance - - - - - - - KC Prop 2 100,000 - - - - - 100,000 Park Impact Fees - - - - - - - 183 Auburndale Park II Capital Costs - - 575,000 - - - 575,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - Other - - 575,000 - - - 575,000 184 Sunset Park Improvements Capital Costs 177,800 - - - - - 177,800 Funding Sources: Fund Balance - - - - - - - Park Impact Fees 177,800 - - - - - 177,800 Other (Contributions)- - - - - - - 185 Cedar Lanes Bike Park Capital Costs 466,000 - - - - - 466,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)135,500 - - 135,500 Park Impact Fees 330,500 - - - - - 330,500 186 BPA Trail on Lea Hill Capital Costs - - 150,000 - - - 150,000 Funding Sources: Fund Balance - - 150,000 - - - 150,000 Grants (Fed,State,Local)- - - - - - - KC Prop 2 - - - - - - - CAPITAL FACILITIES PLAN PROJECTS AND FINANCING MUNICIPAL PARKS CONSTRUCTION FUND 176 City of Auburn Capital Facilities Plan TABLE PR-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING MUNICIPAL PARKS CONSTRUCTION FUND 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 187 Lakeland Hills Nature Area Capital Costs - 25,000 - 75,000 100,000 - 200,000 Funding Sources: Fund Balance - - - - - - - Park Mitigation Fees - - - - - - - Park Impact Fees - 25,000 - 75,000 100,000 - 200,000 188 Miscellaneous Parks Improvements Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Fund Balance 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Grants (Fed,State,Local)- - - - - - - KC Prop 2 - - - - - - - Park Impact Fees 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Subtotal, Capacity Projects: Capital Costs 4,688,850 3,675,000 950,000 5,300,000 325,000 225,000 15,163,850 Page Non-Capacity Projects: 189 Cameron Park Capital Costs - 55,000 - 55,000 - - 110,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- 55,000 - 55,000 - - 110,000 Other - - - - - - - 190 Fulmer Park Playground Replacement Capital Costs 150,000 - - - - - 150,000 Funding Sources: Fund Balance - - - - - - - Grants (Private)50,000 - - - - - 50,000 KC Prop 2 100,000 - - - - - 100,000 191 Fairway Drainage Improvement Capital Costs 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - REET 2 30,000 30,000 30,000 30,000 30,000 30,000 180,000 192 Community Center Parking Lot Improvements Capital Costs 300,000 - - - - - 300,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - REET 1 300,000 - - - - - 300,000 Subtotal, Non-Capacity Projects: Capital Costs 480,000 85,000 30,000 85,000 30,000 30,000 740,000 2022 2023 2024 2025 2026 2027 Total SUMMARY: CAPITAL COSTS Capacity Projects 4,688,850 3,675,000 950,000 5,300,000 325,000 225,000 15,163,850 Non-Capacity Projects 480,000 85,000 30,000 85,000 30,000 30,000 740,000 Total Costs 5,168,850 3,760,000 980,000 5,385,000 355,000 255,000 15,903,850 FUNDING SOURCES: Fund Balance 50,000 50,000 200,000 50,000 50,000 50,000 450,000 Grants (Fed,State,Local)535,500 555,000 - 1,055,000 - - 2,145,500 Grants -Private 50,000 - - - - - 50,000 KC Prop 2 563,500 50,000 125,000 125,000 125,000 125,000 1,113,500 Parks Impact 3,639,850 575,000 50,000 2,125,000 150,000 50,000 6,589,850 Parks Mitigation - - - - - - - REET 1 300,000 - - - - - 300,000 REET 2 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Other - 2,500,000 575,000 2,000,000 - - 5,075,000 Total Funding 5,168,850 3,760,000 980,000 5,385,000 355,000 255,000 15,903,850 177 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Park Acquisitions/Development Project No:gpbd04 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance 39,183 - - - 39,183 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET1 647,050 26,516 - - 673,566 KC Prop 2 - 30,000 30,000 50,000 60,000 686,233 56,516 30,000 50,000 772,749 Capital Expenditures: Design - - - - Acquisition 686,233 56,516 30,000 50,000 772,749 Construction - - - - - 686,233 56,516 30,000 50,000 772,749 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET1 - - - - - KC Prop 2 125,000 125,000 125,000 125,000 580,000 125,000 125,000 125,000 125,000 580,000 Capital Expenditures: Design - - - - - Acquisition 125,000 125,000 125,000 125,000 580,000 Construction - - - - - 125,000 125,000 125,000 125,000 580,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Land and other property acquisitions to occur based on demand and deficiencies including parks, open space, trails, corridors and recreational facilities. Progress Summary: The City purchased the Auburn Avenue Theater and the Qares property in 2020. Future Impact on Operating Budget: 178 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Jacobsen Tree Farm Development Project No:cp0609, cp2020 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance 25,321 - - - 25,321 Grants- Unsecured State - - - - - King County Prop 2 14,165 - 333,500 - 347,665 Park Impact Fees - - 2,581,550 - 2,581,550 Other (TBD)- - - 2,500,000 2,500,000 39,486 - 2,915,050 2,500,000 5,454,536 Capital Expenditures: Design 39,486 - 300,000 - 339,486 Right of Way - - - - - Construction - - 2,615,050 2,500,000 2,615,050 39,486 - 2,915,050 2,500,000 2,954,536 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured State - 1,000,000 - - 1,000,000 King County Prop 2 - - - - 333,500 Park Impact Fees - 2,000,000 - 4,581,550 Other (TBD)- 2,000,000 - - 4,500,000 - 5,000,000 - - 10,415,050 Capital Expenditures: Design - 500,000 - - 800,000 Right of Way - - - - - Construction - 4,500,000 - - 9,615,050 - 5,000,000 - - 10,415,050 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Develop the 29.3 acre site into a Community Park. A Master Plan for the park was completed in 2009 and will serve as a roadmap for development of the site. The newly annexed Lea Hill area of the City is deficient in park acreage. Progress Summary: Future Impact on Operating Budget: No significant impact due to master plan. Future park development will result in maintenance and utility expenses undeterminable at this time. 179 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: West Hill Park Acquisition and Development Project No:gpbd27 Project Type:Capacity Project Manager:Jamie Kelly Description: Progress Summary: Undetermined at this time. Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Municipal Parks Construction Fund - - - - - Local Grant (Unsecured)- - 400,000 500,000 400,000 Bond Proceeds - - - - - REET - - - - - Park Impact Fees - 50,000 350,000 500,000 400,000 Total Funding Sources:- 50,000 750,000 1,000,000 800,000 Capital Expenditures: Design - - - 150,000 - Construction - - - 850,000 - Acquisition - 50,000 750,000 - 800,000 Total Expenditures:- 50,000 750,000 1,000,000 800,000 Forecasted Project Cost: Total 2024 2025 2026 2027 2022-2027 Funding Sources: Municipal Parks Construction Fund - - - - - Local Grant (Unsecured)- - - - 900,000 Bond Proceeds - - - - - REET - - - - - Park Impact Fees - - - - 850,000 Total Funding Sources:- - - - 1,750,000 Capital Expenditures: Design - - - - 150,000 Construction - - - - 850,000 Acquisition - - - - 750,000 Total Expenditures:- - - - 1,750,000 Grants / Other Sources: The City has been exploring local and state funding for acquisition and development. Staff to send out form letters to existing property owners in an effort to gauge interest in selling suitable properties to the City. Acquire property adjacent to Watershed property on the West Hill, and develop park. Park to be used as access to the trails on the watershed property. Improvements to include parking, playground, restroom, and kiosks. Future Impact on Operating Budget: 180 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Game Farm Park Improvements Project No: cp1720, cp1924 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year EndFunding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance 13,431 - - 13,431 Grants- Unsecured State - - - - - Grants- Secured Local -KCYSF 150,000 - - 150,000 REET 1 - 1,000,000 - - 1,000,000 Other (Park Mitigation Fee)- - - - - Other (Park Impact Fee)334,012 - 150,000 - 484,012 497,443 1,000,000 150,000 - 1,647,443 Capital Expenditures: Design - 40,000 - - 40,000 Right of Way - - - - - Construction 497,443 960,000 150,000 - 1,607,443 497,443 1,000,000 150,000 - 1,647,443 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured State - - - - - Grants- Secured Local -KCYSF - - - - - REET 1 - - - - - Other (Park Mitigation Fee)- - - - - Other (Park Impact Fee)- - - - 150,000 - - - - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 150,000 - - - - 150,000 Grants / Other Sources: King County Youth Sports Facilities Grant Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Improve interior lighting and pathways and provide access from the newly acquired property on southwest corner of the park. The project will also replace synthetic turf on two full sized soccer fields. Progress Summary: City completed resurfacing project on the turf fields in early 2021. Future improvements to include lighting for the pickleball and basketball courts. Future Impact on Operating Budget: 181 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Auburndale Park Project No:gpbd01 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)- - - - - Other (KC Prop 2)- - 100,000 - 100,000 - 100,000 - 100,000 Capital Expenditures: Design - - 5,000 - 5,000 Right of Way - - - - - Construction - - 95,000 - 95,000 - - 100,000 - 100,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)- - - - - Other (KC Prop 2)- - - - 100,000 - - - - 100,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - 95,000 - - - - 100,000 Grants / Other Sources: Progress Summary: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Utilities would increase by $5,000 Develop a Master Plan for the Park, install an irrigation system, new play structure and improve signage. Create an entrance to the park from the east via 110th Ave SE to allow access from the adjacent neighborhoods. Construct new section of trail in the western portion of the park. Progress Summary: Future Impact on Operating Budget: 182 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Auburndale Park II Project No:gpbd05 Project Type:Capacity Project Manager:Daryl Faber Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD 575,000 - - - 575,000 575,000 - - - 575,000 Capital Expenditures: Design 75,000 - - - 75,000 Right of Way - - - - - Construction 500,000 - - - 500,000 575,000 - - - 575,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Develop a Master Plan, improve the existing trail system and install signage and play structure. Progress Summary: Future Impact on Operating Budget: Increased utility costs of $2,000 183 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Sunset Park Improvements Project No:cp1921 Project Type:Capacity Project Manager:Daryl Faber Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees 22,235 - 177,800 - 200,035 Other -Contributions & Donations - - - - - 22,235 - 177,800 - 200,035 Capital Expenditures: Design - - 15,000 - 15,000 Right of Way - - - - - Construction 22,235 - 162,800 - 185,035 22,235 - 177,800 - 200,035 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - - - - 177,800 Other -Contributions & Donations - - - - - - - - - 177,800 Capital Expenditures: Design - - - - 15,000 Right of Way - - - - - Construction - - - - 162,800 - - - - 177,800 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Expand playground area to include spray park and additional play activities. Coordinate improvements with service club and Lakeland Hills Homeowners Association. Progress Summary: Future Impact on Operating Budget: Increase in Utilities of $10,000 per year 184 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Cedar Lanes Bike Park Project No:cp2127 Project Type:Capacity Project Manager:Jamie Kelly Description: Progress Summary: None Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Municipal Parks Construction Fund - - - - - KC Youth Sports Grant (Secured)- 7,500 135,500 - 143,000 Bond Proceeds - - - - - REET - - - - - Park Impact Fees - 7,500 330,500 - 338,000 Total Funding Sources:- 15,000 466,000 - 481,000 Capital Expenditures: Design - 15,000 15,000 - 30,000 Right of Way - - - - - Construction - - 451,000 - 451,000 Total Expenditures:- 15,000 466,000 - 481,000 Forecasted Project Cost: Total 2024 2025 2026 2027 2022-2027 Funding Sources: Municipal Parks Construction Fund - - - - - KC Youth Sports Grant (Secured)- - - - 135,500 Bond Proceeds - - - - - REET - - - - - Park Impact Fees - - - - 330,500 Total Funding Sources:- - - - 466,000 Capital Expenditures: Design - - - - 15,000 Right of Way - - - - - Construction - - - - 451,000 Total Expenditures:- - - - 466,000 Grants / Other Sources: Construct a bike park and restroom at Cedar Lanes Park. Bike park to include an asphalt pump track and skills course. Pedestrian trails in the park will also be improved. Future Impact on Operating Budget: City has contracted with Evergreen Mountain Bike Alliance for design of the pump track and skills course. Construction anticipated in Spring 2022. 185 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: BPA Trail on Lea Hill Project No:gpbd23 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (State RCO)- - - - - Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - - - - - - Capital Expenditures: Predesign - - - - - Design - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance 150,000 - - - 150,000 Grants- Unsecured (State RCO)- - - - - Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - 150,000 - - - 150,000 Capital Expenditures: Predesign 25,000 - - - 25,000 Design 125,000 - - - 125,000 Construction - - - - - 150,000 - - - 150,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Develop a feasibility study related to constructability of a pedestrian trail linking the Jacobsen Tree Farm site to the west end of Lea Hill. This trail would follow the alignment of the Bonneville Power Administration (BPA) transmission lines from 132nd to 108th Avenue SE. Construction would be in phases based on constructability. Progress Summary: Future Impact on Operating Budget: 186 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Lakeland Hills Nature Area Project No:gpbd11 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - - 25,000 - Park Mitigation Fees - - - - - - - 25,000 - Capital Expenditures: Design - - - 25,000 - Right of Way - - - - - Construction - - - - - - - - 25,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - 75,000 100,000 - 200,000 Park Mitigation Fees - - - - - - 75,000 100,000 - 200,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - 75,000 100,000 - 175,000 - 75,000 100,000 - 200,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Increased maintenance costs of $5,000 Complete Master Plan to include the development and construction of an environmental community park. Trails, fencing, parking and visitor amenities are included in the project. Progress Summary: Future Impact on Operating Budget: 187 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Miscellaneous Parks Improvements Project No:various, gpbd03 Project Type:Capacity/Non-Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance 19,250 78,000 50,000 50,000 147,250 Grants- Unsecured State - - - - - Local Grant - - - - - KC Prop 2 - 177,500 - - 177,500 Other (Park Impact Fee)25,000 113,869 50,000 50,000 188,869 44,250 369,369 100,000 100,000 513,619 Capital Expenditures: Professional Services - - - - - Right of Way - - - - - Construction 44,250 369,369 100,000 100,000 513,619 44,250 369,369 100,000 100,000 513,619 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance 50,000 50,000 50,000 50,000 300,000 Grants- Unsecured State - - - - - Local Grant - - - - - KC Prop 2 - - - - - Other (Park Impact Fee)*50,000 50,000 50,000 50,000 300,000 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Professional Services - - - - - Right of Way - - - - - Construction 100,000 100,000 100,000 100,000 600,000 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Minor park improvements including shelters, roofs, playgrounds, irrigation and restrooms. Progress Summary: Project funding includes the Mill Pond Dock Improvement (cp1915) in 2019, funded $25,000 to help complete the West Auburn Lake Park (cp1801) in 2020 and $36,000 for the Lea Hill Mini Soccer Field Turf replacement (cp2122) in 2021 Future Impact on Operating Budget: 188 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Cameron Park Project No:gpbd24 Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured Local - - - 55,000 - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - 55,000 - Capital Expenditures: Design - - - 5,000 - Right of Way - - - - - Construction - - - 50,000 - - - - 55,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured Local - 55,000 - - 110,000 Bond Proceeds - - - - - REET - - - - - Other - - - - - - 55,000 - - 110,000 Capital Expenditures: Design - 5,000 - - 10,000 Right of Way - - - - - Construction - 50,000 - - 100,000 - 55,000 - - 110,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None This project will improve the pedestrian trail and add landscape and fencing to serve as buffer to the neighborhood and play structure. This project is identified in the Parks Improvement Plan. Progress Summary: Future Impact on Operating Budget: 189 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Fulmer Park Playground Replacement Project No:gpbd25 Project Type:Non-Capacity Project Manager:Jamie Kelly Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Municipal Parks Construction Fund - - - - - Grants- Kaboom - - 50,000 - 50,000 Bond Proceeds - - - - - REET - - - - - KC Prop 2 - - 100,000 - 100,000 - - 150,000 - 150,000 Capital Expenditures: Design - - 7,500 - 7,500 Right of Way - - - - - Construction - - 142,500 - 142,500 - - 150,000 - 150,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Municipal Parks Construction Fund - - - - - Grants- Kaboom - - - - 50,000 Bond Proceeds - - - - - REET - - - - - KC Prop 2 - - - - 100,000 - - - - 150,000 Capital Expenditures: Design - - - - 7,500 Right of Way - - - - - Construction - - - - 142,500 - - - - 150,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Replace aging playground. Progress Summary: Future Impact on Operating Budget: None 190 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Fairway Drainage Improvement Project No:gpbd19, cp1911, cp2002, cp2104 Project Type:Non-capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Municipal Parks Construction Fund 527 - - - 527 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET 2 57,454 30,000 30,000 30,000 117,454 Other - - - - - 57,981 30,000 30,000 30,000 117,981 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 57,981 30,000 30,000 30,000 117,981 57,981 30,000 30,000 30,000 117,981 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Municipal Parks Construction Fund - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET 2 30,000 30,000 30,000 30,000 180,000 Other - - - - - 30,000 30,000 30,000 30,000 180,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 30,000 30,000 30,000 180,000 30,000 30,000 30,000 30,000 180,000 Grants / Other Sources: Apply top dressing sand to the first five fairways in order to firm up these landing areas so that the holes are playable year round. Sand will be applied with a three yard topdressing machine. Sand will be applied bi/weekly at a tenth of an inch of sand throughout the fairways. Fairways will start to show improvements once four inches of sand are applied. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Progress Summary: Future Impact on Operating Budget: None 191 City of Auburn Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Community Center Parking Lot Improvements Project No:cp2111 Project Type:Non-Capacity Project Manager:Jamie Kelly Description: Progress Summary: None Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Municipal Parks Construction Fund - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET 1 - 50,000 300,000 - 350,000 Other - - - - - Total Funding Sources:- 50,000 300,000 - 350,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - - 300,000 - 300,000 Total Expenditures:- 50,000 300,000 - 350,000 Forecasted Project Cost: Total 2024 2025 2026 2027 2022-2027 Funding Sources: Municipal Parks Construction Fund - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET 1 - - - - 300,000 Other - - - - - Total Funding Sources:- - - - 300,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 300,000 Total Expenditures:- - - - 300,000 Grants / Other Sources: Resurface the main drive that serves the Community and Event Center at Les Gove Park. The existing pervious concrete surface is deteriorated from weather and heavy use. Parks staff will work with Public Works and industry professionals to determine appropriate surfacing. Future Impact on Operating Budget: 192 City of Auburn Capital Facilities Plan TABLE PR-3 Impact on Future Operating Budgets Parks, Arts & Recreation – Municipal Parks Construction Project:2023 2024 2025 2026 2027 2028 Total 1 Auburndale Park 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 30,000$ 2 Auburndale Park II - - 2,000 2,000 2,000 2,000 8,000 3 Sunset Park 10,000 10,000 10,000 10,000 10,000 10,000 60,000 4 Lakeland Hills Nature Area - - - - 5,000 5,000 10,000 Total 15,000$ 15,000$ 17,000$ 17,000$ 22,000$ 22,000$ 108,000$ 193 City of Auburn Capital Facilities Plan SENIOR CENTER Current Facilities The City of Auburn currently has one Senior Center. Table PR-5 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 145.32 square feet per 1,000 population is based on the existing inventory divided by the 2022 citywide population of 83,950. The proposed LOS of 136.50 square feet per 1,000 population is based on the projected inventory divided by the 2027-projected citywide population of 89,379. Capital Facilities Projects and Financing The CFP does not include any senior center capital facilities projects during 2022-2027 Impact on Future Operating Budgets There are no operating budget impacts forecasted for the senior center facility during the six years 2023 – 2028. TABLE PR-5 Facilities Inventory Senior Center CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: Senior Center 12,200 808 9th Street SE Total Existing Inventory 12,200 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2027 Projected Inventory Total 12,200 194 City of Auburn Capital Facilities Plan GENERAL MUNICIPAL BUILDINGS Current Facilities The current inventory of City government administration and operations facilities include 207,629 square feet for general government operations, 66,469 square feet for police services, and 38,646 square feet for fire protection, for a total of 312,744 square feet. Table GM – 1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 3,725.36 square feet per 1,000 population is based on the existing inventory divided by the 2022 citywide population of 83,950. The proposed LOS of 3,543.83 square feet per 1,000 population is based on the projected inventory divided by the 2027-projected citywide population of 89,379. Capital Facilities Projects and Financing The City’s General Municipal Building facilities include four capital projects at a cost of $2,195,510 and debt service at a cost of $3.314.000 for a total of $5,509,510. The major projects include (1) $1,028,000 for the Auburn Arts & Culture Center Renovation, (2) $810,000 for M&O Facility Improvement (3) $320,000 for M&O Fuel Tank and $3,314,000 for City Hall Annex debt service costs. Table GM – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table GM-3 shows, operating budget impacts of $570,000 are forecasted for General Municipal buildings facilities during the six years 2023- 2028. 195 City of Auburn Capital Facilities Plan TABLE GM-1 Facilities Inventory General Municipal Buildings CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: General Government: City Hall 61,721 25 W Main Street City Hall Annex 45,034 1 W Main Street City Maintenance & Operations Facility 17,940 1305 C Street SW Community Center 13,973 910 9th Street SE Municipal Court (Justice Center-Leased to King County)12,200 340 E Main Street Activity Center 10,074 910 9th Street SE Auburn Arts & Culture Center 8,744 100 Auburn Avenue Auburn Avenue Theater 7,560 10 Auburn Avenue Youth Center 7,132 910 9th Street SE Auburn Valley Humane Society -(Leased to AVHS)5,900 4910 A Street GSA Building 5,580 2905 C Street SW #815 R Street Building 4,977 2840 Riverwalk Drive Les Gove Storage Building 4,044 910 9th Street SE Street Waste Handling Facility 2,750 1305 C Street SW Total 207,629 Police: Gun range 32,880 1600 Block 15th St NW Headquarters (Justice Center)24,800 340 E Main Street R Street Building (Leased to Puget Sound Theft Task Force)4,789 2840 Riverwalk Drive Seized vehicle parking stalls 3,000 2905 C Street SW GSA Building 1,000 2905 C Street SW #815 Total 66,469 Fire: Stations: GSA Station #35 16,526 2905 C Street SW North Station #31 12,220 1101 D Street NE South Station #32 5,200 1951 R Street SE Other Facilities: North Station Maint. Facility 4,700 1101 D Street NE Total 38,646 Total Existing Inventory 312,744 Proposed Capacity Projects: Maintenance & Operations New Maintenance Bay 4,000 Total Proposed Capacity Projects 4,000 2027 Projected Inventory Total 316,744 196 City of Auburn Capital Facilities Plan TABLE GM-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 198 Auburn Arts & Culture Center Renovation Capital Costs 28,000 1,000,000 - - - - 1,028,000 Funding Sources: Fund Balance - - - - - - - Grants 28,000 500,000 - - - - 528,000 Other (Cumulative Reserve F122)- - - - - - - Other Park Impact Fees - 500,000 - - - - 500,000 Subtotal, Capacity Projects: Capital Costs 28,000 1,000,000 - - - - 1,028,000 Non-Capacity Projects: 199 M&O Facility Improvement - Phase 1 Capital Costs 810,000 - - - - - 810,000 Funding Sources: Equipment Rental Fund 194,000 - - - - - 194,000 Operating Transfer - General Fund 20,020 - - - - - 20,020 Operating Transfer -Water 198,660 - - - - - 198,660 Operating Transfer -Sewer 198,660 - - - - - 198,660 Operating Transfer -Storm 198,660 - - - - - 198,660 200 M&O Fuel Tank Replacement Capital Costs 320,000 - - - - - 320,000 Funding Sources: Equipment Rental Fund 80,000 - - - - - 80,000 Operating Transfer -Water 80,000 - - - - - 80,000 Operating Transfer -Sewer 80,000 - - - - - 80,000 Operating Transfer -Storm 80,000 - - - - - 80,000 201 HVAC Equipment Replacement Capital Costs 37,510 - - - - - 37,510 Funding Sources: Operating Transfer -Facilities 37,510 - - - - - 37,510 REET 1 - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 1,167,510 - - - - - 1,167,510 202 City Hall Annex Long-Term Debt 553,500 553,400 552,700 553,800 551,700 548,900 3,314,000 Funding Sources: REET 1 553,500 553,400 552,700 553,800 551,700 548,900 3,314,000 2022 2023 2024 2025 2026 2027 Total SUMMARY: CAPITAL COSTS Capacity Projects 28,000 1,000,000 - - - - 1,028,000 Non-Capacity Projects 1,167,510 - - - - - 1,167,510 Long-Term Debt 553,500 553,400 552,700 553,800 551,700 548,900 3,314,000 Total Costs 1,749,010 1,553,400 552,700 553,800 551,700 548,900 5,509,510 FUNDING SOURCES: Equipment Rental Fund 274,000 - - - - - 274,000 Operating Transfer- Gen. Fund 20,020 - - - - - 20,020 Operating Transfer -Water 278,660 - - - - - 278,660 Operating Transfer -Sewer 278,660 - - - - - 278,660 Operating Transfer -Storm 278,660 - - - - - 278,660 Operating Transfer -Facilities 37,510 - - - - - 37,510 Grants 28,000 500,000 - - - - 528,000 Park Impact Fees - 500,000 - - - - 500,000 REET 1 553,500 553,400 552,700 553,800 551,700 548,900 3,314,000 Total Funding 1,749,010 1,553,400 552,700 553,800 551,700 548,900 5,509,510 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING GENERAL MUNICIPAL BUILDINGS 197 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Auburn Arts & Culture Center Renovation Project No:cp1612 Project Type:Capacity Project Manager:Daryl Faber Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - 10,150 - - 10,150 Grants- Secured (State)58,777 431,223 - - 490,000 Grants- Secured (Local)314,043 94,107 28,000 - 436,150 Grants -Unsecured (Local)- - - 500,000 500,000 Other -(Cumulative Reserve)- 42,200 - - 42,200 Other -(TBD)- 200,000 - - 200,000 Other -(Contributions & Donations)14,850 - - - 14,850 Other (Park Impact Fee)5,912 844,088 - 500,000 850,000 393,582 1,621,768 28,000 1,000,000 2,543,350 Capital Expenditures: Design 190,143 45,000 - 75,000 235,143 Right of Way - - - - - Construction 203,439 1,576,768 28,000 925,000 1,808,207 393,582 1,621,768 28,000 1,000,000 2,043,350 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants- Secured (State)- - - - - Grants- Secured (Local)- - - - 28,000 Grants -Unsecured (Local)- - - - 500,000 Other -(Cumulative Reserve)- - - - - Other -(Contributions & Donations)- - - - - Other (Park Impact Fee)- - - - 500,000 - - - - 1,028,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - - - - 953,000 - - - - 1,028,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Renovation to the property and building located at 20 Auburn Avenue (100 Auburn Avenue) Building for the creation of an Arts & Culture Center in downtown Auburn. The renovation of this building will allow increased access to the arts for all of Auburn residents and visitors. Having a dedicated Art Center alongside the Auburn Avenue Theater performing arts series has the potential to transform Auburn into an arts tourism destination within the South Puget Sound. This project is a high priority for the City of Auburn and the purchase of this important building was completed in 2016. Progress Summary: The City has secured $898,000 in grant funding. The historic window restoration was completed in 2018, interior demolition started in 2019, and final renovation designs completed in 2020. It is anticipated that Phase 1 renovation of the main floor will begin in 2020 and continue through 2021. As a landmark building, exterior renovations must maintain the historic character of the building. Phase 2 renovations for the basement are expected to begin in 2023 at which time the City intends to apply for additional grant funds. Future Impact on Operating Budget: The annual operating budget fiscal impact is estimated to be $95,000. 198 City of Auburn Capital Facilities Plan EQUIPMENT RENTAL FUND (560)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: M&O Facility Improvement - Phase 1 Project No:cp2107 Project Type: Project Manager:Matt Larson Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Equip. Rental Revenue - 24,000 194,000 - 218,000 General Fund - Transfer-in - 2,470 20,020 - 22,490 Water Fund - Transfer-in - 24,510 198,660 - 223,170 Sewer Fund - Transfer-in - 24,510 198,660 - 223,170 Storm Fund - Transfer-in - 24,510 198,660 - 223,170 - 100,000 810,000 - 910,000 Capital Expenditures: Design - 100,000 20,000 - 120,000 Construction - 790,000 - 790,000 - 100,000 810,000 - 910,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 194,000 General Fund - Transfer-in - - - - 20,020 Water Fund - Transfer-in - - - - 198,660 Sewer Fund - Transfer-in - - - - 198,660 Storm Fund - Transfer-in - - - - 20,020 - - - - 631,360 Capital Expenditures: Design - - - - 20,000 Construction - - - - 790,000 - - - - 810,000 Grants / Other Sources: None Non-Capacity This project will enclose the existing eight bay large fleet covered parking area north of the Public Works M&O's main building by installing full height mechanically operated door systems. This project will also expand the existing M&O building with a new Central Stores and reconfigure the existing building to increase the fleet maintenance area. Progress Summary: Project design phase began in May 2021. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 199 City of Auburn Capital Facilities Plan EQUIPMENT RENTAL FUND (560)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: M&O Fuel Tank Replacement Project No:erbd01 Project Type: Project Manager:Tyler Thompson Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Equip. Rental Revenue - - 80,000 - 80,000 REET 1 - - - - - Water Fund - Transfer-in - - 80,000 - 80,000 Sewer Fund - Transfer-in - - 80,000 - 80,000 Storm Fund - Transfer-in - - 80,000 - 80,000 - - 320,000 - 320,000 Capital Expenditures: Design - 25,000 - 25,000 Right of Way - - - - - Construction - 295,000 - 295,000 - - 320,000 - 320,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 80,000 REET 1 - - - - - Water Fund - Transfer-in - - - - 80,000 Sewer Fund - Transfer-in - - - - 80,000 Storm Fund - Transfer-in - - - - 80,000 - - - - 320,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - - - - 295,000 - - - - 320,000 Grants / Other Sources: This project should reduce the operating budget due to lower maintenance and inspection costs. Non-Capacity Replace three 10,000 gallon underground tanks with new above ground tanks. The existing tanks were installed in 1989 and are single wall fiberglass tanks. It will be a benefit to the City to have the tanks above ground in the future due to the reduced maintenance and inspection cost. Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: 200 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: HVAC Equipment Replacement Project No:gcbd17, cp2108, 2113, 2114 Project Type:Non-Capacity Project Manager:Lisa Moore Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - Grants - Unsecured State - - - - - Grants - Local Unsecured - - - - - REET 1 - 730,840 - 730,840 Facilities Fund-Transfer In - 371,470 37,510 - 408,980 - 1,102,310 37,510 - 1,139,820 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 1,102,310 37,510 - 1,139,820 - 1,102,310 37,510 - 1,139,820 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants - Unsecured State - - - - - Grants - Local Unsecured - - - - - REET 1 - - - - - Facilities Fund-Transfer In - - - - 37,510 - - - - 37,510 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 37,510 - - - - 37,510 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Replace HVAC Equipment at City Hall, Auburn Senior Center, Mountain View Cemetery, Arts & Culture Center building, Maintenance and Operations building and the Auburn Avenue Theater. Progress Summary: Future Impact on Operating Budget: This project will reduce operating costs through energy conservation and reduced maintenance and repair. 201 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: City Hall Annex Project No:N/A Project Type:Long Term Debt Project Manager: Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 1,316,650 553,000 553,500 553,400 2,423,150 1,316,650 553,000 553,500 553,400 2,423,150 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 1,316,650 553,000 553,500 553,400 2,423,150 1,316,650 553,000 553,500 553,400 2,423,150 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 552,700 553,800 551,700 548,900 3,314,000 552,700 553,800 551,700 548,900 3,314,000 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 552,700 553,800 551,700 548,900 3,314,000 552,700 553,800 551,700 548,900 3,314,000 Grants / Other Sources: To pay scheduled debt service costs on 2010 General Obligation bonds issued for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: N/A Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 202 City of Auburn Capital Facilities Plan Impact on Future Operating Budgets General Municipal Buildings . Project:2023 2024 2025 2026 2027 2028 Total 1 Auburn Arts & Culture Ctr. Renovation -$ 95,000$ 95,000$ 95,000$ 95,000$ 95,000$ 475,000$ Total -$ 95,000$ 95,000$ 95,000$ 95,000$ 95,000$ 475,000$ 203 City of Auburn Capital Facilities Plan 204 City of Auburn Capital Facilities Plan COMMUNITY IMPROVEMENTS Current Facilities Community Improvements include the 104th Avenue Park development, sidewalk and traffic signal improvements, neighborhood traffic calming program, public art and phase two of the Auburn Environmental Park Boardwalk project. Level of Service (LOS) No Level of Service for community improvement projects have been identified at this time. Capital Facilities Projects and Financing The City’s proposed Community Improvements include fourteen capital projects at a cost of $8,582,900 and debt service at a cost of $900,500 for a total of $9,483,400. Table CI-2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets As Table CI-3 shows, because of the City Street light LED retrofit program the operating budget will save approximately $785,000 for community improvement facilities during the six years 2023-2028. 205 City of Auburn Capital Facilities Plan TABLE CI-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 208 Auburn Way South (SR-164) - Southside Sidewalk Improvements Capital Costs 95,000 750,000 - - - - 845,000 Funding Sources: Grants 80,000 615,000 - - - - 695,000 REET 2 15,000 60,000 - - - - 75,000 Other (MIT)- 75,000 - - - - 75,000 209 104th Ave. Park Development Capital Costs 1,770,200 - - - - - 1,770,200 Funding Sources: Grants 451,370 - - - - - 451,370 Other - Park Impact Fees 1,318,830 - - - - - 1,318,830 210 Downtown Plaza Park Capital Costs 377,700 - - - - - 377,700 Funding Sources: Other Park Impact Fees 145,230 - - - - - 145,230 Other -Developer Fees 232,470 - - - - - 232,470 Subtotal, Capacity Projects: Capital Costs 2,242,900 750,000 - - - - 2,992,900 Non-Capacity Projects: 211 Public Art Capital Costs 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Funding Sources: REET 2 30,000 30,000 30,000 30,000 30,000 30,000 180,000 212 Citywide ADA & Sidewalk Improvements Capital Costs 185,000 145,000 20,000 220,000 190,000 20,000 780,000 Funding Sources: REET 2 185,000 125,000 20,000 200,000 170,000 - 700,000 Other (Fees)- 20,000 - 20,000 20,000 20,000 80,000 213 Sidewalk and ADA Inventory Capital Costs - 200,000 - - - - 200,000 Funding Sources: REET 2 - 200,000 - - - - 200,000 214 Lea Hill Safe Routes to Schools Capital Costs - 70,000 950,000 - - - 1,020,000 Funding Sources: Grants - 55,000 700,000 - - - 755,000 REET2 - 15,000 200,000 - - - 215,000 Other -Auburn School Dist.- - 50,000 - - - 50,000 215 Annual Traffic Signal Replacement & Improvements Capital Costs 100,000 180,000 185,000 190,000 195,000 200,000 1,050,000 Funding Sources: REET 2 100,000 180,000 185,000 190,000 195,000 200,000 1,050,000 216 Citywide Street Lighting Improvements Capital Costs 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Funding Sources: REET 2 50,000 50,000 50,000 50,000 50,000 50,000 300,000 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COMMUNITY IMPROVEMENTS 206 City of Auburn Capital Facilities Plan TABLE CI-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COMMUNITY IMPROVEMENTS 2022 2023 2024 2025 2026 2027 Total Page Non-Capacity Projects: 217 City Street Lighting LED Retrofit Capital Costs 10,000 - - - - - 10,000 Funding Sources: REET 2 10,000 - - - - - 10,000 218 Neighborhood Traffic Calming Program Capital Costs 150,000 150,000 150,000 150,000 150,000 150,000 900,000 Funding Sources: REET 2 150,000 150,000 150,000 150,000 150,000 150,000 900,000 219 City Wetland Mitigation Projects Capital Costs 5,000 5,000 5,000 5,000 5,000 5,000 30,000 Funding Sources: Other (Fund 124-Wetland Mit.)5,000 5,000 5,000 5,000 5,000 5,000 30,000 220 Auburn Environmental Park Boardwalk -Phase 2 Capital Costs - 75,000 800,000 - - - 875,000 Funding Sources: REET 2 - 75,000 - - - - 75,000 Other - To Be Determined - - 800,000 - - - 800,000 221 City Downtown Public Parking Lot Reconfiguration Capital Costs 245,000 - - - - - 245,000 Funding Sources: Local Revitalization Fund 245,000 - - - - - 245,000 222 Local Revitalization Long Term Debt 152,300 150,800 148,800 151,300 148,000 149,300 900,500 Funding Sources: REET 2 152,300 150,800 148,800 151,300 148,000 149,300 900,500 Subtotal, Non-Capacity Projects: Capital Costs 775,000 905,000 2,190,000 645,000 620,000 455,000 5,590,000 SUMMARY: CAPITAL COSTS Capacity Projects 2,242,900 750,000 - - - - 2,992,900 Non-Capacity Projects 775,000 905,000 2,190,000 645,000 620,000 455,000 5,590,000 Long-Term Debt 152,300 150,800 148,800 151,300 148,000 149,300 900,500 Total Costs 3,170,200 1,805,800 2,338,800 796,300 768,000 604,300 9,483,400 FUNDING SOURCES: Local Revitalization Fund 330 245,000 - - - - - 245,000 Grants 531,370 670,000 700,000 - - - 1,901,370 REET 2 692,300 1,035,800 783,800 771,300 743,000 579,300 4,605,500 Other -To Be Determined - - 800,000 - - - 800,000 Other (Fees)- 20,000 - 20,000 20,000 20,000 80,000 Other (MIT)- 75,000 - - - - 75,000 Other (Developer Fees)232,470 - - - - - 232,470 Other -Auburn School Dist.- - 50,000 - - - 50,000 Other (Fund 124-Parks Impact)1,464,060 - - - - - 1,464,060 Other (Fund 124-Wetland Mit.)5,000 5,000 5,000 5,000 5,000 5,000 30,000 Total Funding 3,170,200 1,805,800 2,338,800 796,300 768,000 604,300 9,483,400 207 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Auburn Way South (SR-164) - Southside Sidewalk Improvements TIP# N-7 Project No:gcbd10 Project Type:Capacity, Non-motorized, Safety Project Manager:TBD Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Grants - Secured - - 80,000 615,000 80,000 REET 2 - - 15,000 60,000 15,000 Other (MIT)- - - 75,000 - - - 95,000 750,000 95,000 Capital Expenditures: Design - - 95,000 - 95,000 Right of Way - - - - - Construction - - - 750,000 - - 95,000 750,000 95,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Grants - Secured - - - - 695,000 REET 2 - - - - 75,000 Other (MIT)- - - - 75,000 - - - - 845,000 Capital Expenditures: Design - - - - 95,000 Right of Way - - - - - Construction - - - - 750,000 - - - - 845,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: The project will construct missing sidewalk along the south side of Auburn Way S. The existing sidewalk along the south side currently ends at the intersection with Howard Road and restarts to the west of the intersection with Muckleshoot Plaza. The sidewalk gap extends for approximately 1,700 feet. The project also includes a Rapid Flashing Rectangular Beacon (RRFB) across Howard Road to provide a connection from the existing non-motorized facilities to the proposed improvements. Progress Summary: Grant funding from WSDOT was awarded in 2021. The design phase will start in 2022, with construction of the improvements completed during 2023. The City and Muckleshoot Indian Tribe have entered into a memorandum of understanding for improvements along the Auburn Way S corridor, and are currently negotiating the funding agreement for this project. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. 208 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: 104th Ave. Park Development Project No: cp1619 Project Type: Capacity Project Manager: Jamie Kelly Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured State - 113,630 451,370 - 565,000 REET2 2,424 - - - 2,424 Other -Park Impact Fees 62,401 171,005 1,318,830 - 1,552,236 64,825 284,635 1,770,200 - 2,119,660 Capital Expenditures: Design 64,825 284,635 - - 349,460 Construction - - 1,770,200 - 1,770,200 Long-Term Debt Service - - - - 64,825 284,635 1,770,200 - 2,119,660 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Cap Improve - - - - - Grants - Secured State - - - - 451,370 REET2 - - - - - Other -Park Impact Fees - - - - 1,318,830 - - - - 1,770,200 Capital Expenditures: Design - - - - - Construction - - - - 1,770,200 Long-Term Debt Service - - - - - - - - - 1,770,200 Grants / Other Sources: Complete Master Plan and construct park improvements identified in the Master Plan. Anticipated improvements include parking, trails, restroom, and playground. Work associated with permit approvals is also included in the budget. Progress Summary: The City was awarded a State grant from RCO where funds became available in June 2019. Park staff is currently working with design consultant team and Public Works to design the project. Design is anticipated to be completed in 2021, and construction in Spring/Summer 2022. Future Impact on Operating Budget: The annual impact on the operating budget is estimated to be $10,000 for temporary wages and $2,500 for supplies. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 209 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Downtown Plaza Park Project No:cp2016 Project Type:Capacity Project Manager:Jamie Kelly Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Developer Fees - 32,160 232,470 - 264,630 Other -Park Impact Fees - - 145,230 - 145,230 - 32,160 377,700 - 409,860 Capital Expenditures: Design - 32,160 17,025 - 49,185 Construction - - 360,675 - 360,675 - 32,160 377,700 - 409,860 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Developer Fees - - - - 232,470 Other -Park Impact Fees - - - - 145,230 - - - - 377,700 Capital Expenditures: Design - - - - 17,025 Construction - - - - 360,675 - - - - 377,700 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will renovate and improve the plaza area across from City Hall. Improvements will complement the new commercial building store fronts on the adjacent property that is being constructed in 2020. Improvement will include, but not be limited to seating, plantings, surfacing, and public art. Progress Summary: Future Impact on Operating Budget: None 210 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Public Art Project No: gcbd05, cp1818 Project Type: Non-Capacity Project Manager: Julie Krueger Description: Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total REET 2 163,000 127,500 30,000 30,000 320,500 163,000 127,500 30,000 30,000 320,500 Capital Expenditures: Design 62,500 - - - 62,500 Construction 100,500 127,500 30,000 30,000 258,000 163,000 127,500 30,000 30,000 320,500 Total 2024 2025 2026 2027 2022-2027 Funding Sources: REET 2 30,000 30,000 30,000 30,000 180,000 30,000 30,000 30,000 30,000 180,000 Capital Expenditures: Construction 30,000 30,000 30,000 30,000 180,000 30,000 30,000 30,000 30,000 180,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: None The City designates $30,000 annually toward the purchase of public art, for placement at designated locations throughout the City. Progress Summary: Arts Commission will meet to assess future needs and seek approval from City Council on placement. Future Impact on Operating Budget: 211 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Citywide ADA & Sidewalk Improvements TIP# N-2 Project No:cp1804, cp1815, cp1902, cp2106, gcbd01 Project Type:Non-Capacity (Annual) Project Manager:James Webb LOS Corridor ID# N/A Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Grants -State 232,875 - - - 232,875 REET 2 485,070 185,000 185,000 125,000 855,070 Other (Fees)40,000 - - 20,000 40,000 757,945 185,000 185,000 145,000 1,127,945 Capital Expenditures: Design 13,807 20,000 37,000 29,000 70,807 Construction 744,138 165,000 148,000 116,000 1,057,138 757,945 185,000 185,000 145,000 1,127,945 Total 2024 2025 2026 2027 2022-2027 Funding Sources: REET 2 20,000 200,000 170,000 - 700,000 Other (Fees)- 20,000 20,000 20,000 80,000 20,000 220,000 190,000 20,000 780,000 Capital Expenditures: Design 4,000 44,000 38,000 4,000 156,000 Construction 16,000 176,000 152,000 16,000 624,000 20,000 220,000 190,000 20,000 780,000 Grants / Other Sources: Description: The program will construct citywide accessibility improvements to the public right-of-way sidewalk system including adding/upgrading curb ramps, removing barriers to access and completing gaps. Projects are prioritized annually based on pedestrian demands, existing deficiencies, and citizen requests. Program funds reflect remaining budget after allocations to specific ADA and sidewalk improvement projects. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: 212 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Sidewalk and ADA Inventory TIP# N-5 Project No:TBD Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - REET 2 - - - 200,000 - - - - 200,000 - Capital Expenditures: Design - - - 200,000 - - - - 200,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance REET 2 - - - - 200,000 - - - - 200,000 Capital Expenditures: Design - - - - 200,000 - - - - 200,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: The project will create an inventory of existing sidewalk and ADA infrastructure located with the public ROW throughout the City. This information will be used to identify and prioritize deficiencies in existing non-motorized infrastructure, and to document progress on the implementation of the ADA transition plan. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. 213 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Lea Hill Safe Routes to Schools TIP# N-11 Project No:gcbd16 Project Type:Non-Motorized Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - Grants - Unsecured - - - 55,000 - REET 2 - - - 15,000 - Other (ASD)- - - - - - - - 70,000 - Capital Expenditures: Design - - - 70,000 - Construction - - - - - - - - 70,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants - Unsecured 700,000 - - - 755,000 REET 2 200,000 - - - 215,000 Other (ASD)50,000 - - - 50,000 950,000 - - - 1,020,000 Capital Expenditures: Design - - - - 70,000 Construction 950,000 - - - 950,000 950,000 - - - 1,020,000 Grants / Other Sources: The project will construct non-motorized improvements along SE 304th St from Hazelwood Elementary School extending east to 124th Ave SE, and along the west side of 124th Ave SE to the south of SE 304th St. The project will complete multiple gaps in the existing non- motorized network. The project will also construct curb and gutter, ADA compliant curb ramps, driveways aprons and retaining walls associated with the new sidewalks. Utility poles will need to be relocated to accommodate the proposed sidewalk alignment in some locations. Additional lighting is proposed for pedestrian safety and will be incorporated onto existing/relocated utility poles, and an RRFB will be installed at the SE 304th St intersection with 116th Ave SE. Ancillary work, including but not limited to, property restoration, grading, storm upgrades, school zone beacon relocation, channelization, fencing, landscaping and mailbox relocation will be addressed with the project. Progress Summary: Grant funding is anticipated to be applied for in 2022. If secured, the design phase will be started in 2023. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Expenditures: 214 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Annual Traffic Signal Replacement & Improvements TIP# I-2 Project No:cp1813, cp1906, cp2004, gcbd07 Project Type:Non-Capacity (Annual) Project Manager:Scott Nutter LOS Corridor ID# N/A Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - Grants - Unsecured - - - - - REET 2 - 304,313 100,000 180,000 404,313 - 304,313 100,000 180,000 404,313 Capital Expenditures: Design - - - - - Construction - 304,313 100,000 180,000 404,313 - 304,313 100,000 180,000 404,313 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants - Unsecured - - - - - REET 2 185,000 190,000 195,000 200,000 1,050,000 185,000 190,000 195,000 200,000 1,050,000 Capital Expenditures: Design - - - - - Construction 185,000 190,000 195,000 200,000 1,050,000 185,000 190,000 195,000 200,000 1,050,000 Grants / Other Sources: Description: The program will replace end of life capital facilities replacement for traffic signal and Intelligent Transportation System equipment including cabinets, video detection cameras, field network devices, traffic cameras, battery backup components, and other related equipment. The program also includes minor safety improvements, operations improvements, and Accessible Pedestrian Signal Improvements based on the requirements of the Americans with Disabilities Act (ADA). Progress Summary: Project continues to complete various intersection improvements. Future Impact on Operating Budget: This project will have a positive impact on the operating budget for street maintenance, reducing maintenance costs. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 215 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Citywide Street Lighting Improvements TIP# I-4 Project No: cp1928, cp2005, gcbd09 Project Type:Non-Capacity Project Manager:Scott Nutter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - Grants - Unsecured - - - - - REET 2 55,640 91,922 50,000 50,000 197,562 55,640 91,922 50,000 50,000 197,562 Capital Expenditures: Design - - - - - Construction 55,640 91,922 50,000 50,000 197,562 55,640 91,922 50,000 50,000 197,562 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - Grants - Unsecured - - - - - REET 2 50,000 50,000 50,000 50,000 300,000 50,000 50,000 50,000 50,000 300,000 Capital Expenditures: Design - - - - - Construction 50,000 50,000 50,000 50,000 300,000 50,000 50,000 50,000 50,000 300,000 Grants / Other Sources: The project constructs lighting improvements throughout the City, including upgrading decorative street lights not converted to LED with the 2020 conversion project, and installing new street lights. Progress Summary: During 2021 a program is being developed to continue the conversion of decorative city street lights and non-city owned street lights which were not included in the 2020 LED conversion project. Future Impact on Operating Budget: New street lights installed with this program will increase the City's street light power costs but this increase will be offset by decreased power costs as existing standard street lights are converted to LED. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 216 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: City Street Light LED Retrofit TIP# I-17 Project No: cp1920 Project Type:Non-Capacity Project Manager:Scott Nutter Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Grants - Secured Federal 373,798 126,202 - - 500,000 Contributions 350,000 - - 350,000 REET 2 1,493,940 346,974 10,000 - 1,850,914 1,867,738 823,176 10,000 - 2,700,914 Capital Expenditures: Design 90,308 94,166 - - 184,474 Construction 1,777,430 729,010 10,000 - 2,516,440 1,867,738 823,176 10,000 - 2,700,914 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Grants - Secured Federal - - - - - Contributions - - - - - REET 2 - - - - 10,000 - - - - 10,000 Capital Expenditures: Design - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The project will convert all City owned cobra-head street lights to LED. This phase of the project will convert all City owned cobra-head street lights to LED and add smart lighting control technology. Federal grant funding for this phase of the project was awarded in 2019. Future phases to upgrade other types of City street lights (such as decorative residential and downtown decorative lights) to LED will be considered as additional funding is available. Progress Summary: A detailed audit of all existing City owned lights and the design phase of the project have been completed. The construction phase of the project is programmed to begin during Spring 2020. REET funds shown in 2021 reflect anticipated carry forward of 2020 funds to complete project in 2021. Future Impact on Operating Budget: Annual savings in power usage is anticipated to be $130,000 per year. Additional maintenance savings will be realized in the reduction of materials for light replacement and is estimated to be $20,000 per year. 217 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Neighborhood Traffic Safety Program TIP# R-1 Project No:cp1814, cp1907, cp2013, gcbd06 Project Type:Non-Capacity (Annual) Project Manager:Scott Nutter Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Fund Balance - - - - - REET 2 33,610 51,937 150,000 150,000 235,547 33,610 51,937 150,000 150,000 235,547 Capital Expenditures: Design - 5,000 30,000 30,000 35,000 Construction 33,610 46,937 120,000 120,000 200,547 33,610 51,937 150,000 150,000 235,547 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Fund Balance - - - - - REET 2 150,000 150,000 150,000 150,000 900,000 150,000 150,000 150,000 150,000 900,000 Capital Expenditures: Design 30,000 30,000 30,000 30,000 180,000 Construction 120,000 120,000 120,000 120,000 720,000 150,000 150,000 150,000 150,000 900,000 Grants / Other Sources: Description: This program will implement low-cost traffic calming strategies, supported by engineering studies as necessary. Projects will be selected annually based on requests from residents, or police concerns, crash history, and available staff and financial resources. Progress Summary: During 2020 and 2021 the scope of the program was reduced due to funding and staffing constraints. A budget ammendment is proposed for 2022 to allow the program to be resumed. Future Impact on Operating Budget: The traffic calming program will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: 218 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: City Wetland Mitigation Projects Project No:cp1315 Project Type:Non-Capacity Project Manager:Jeff Tate Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Fund 124 Wetland Mitigation Account 6,969 36,600 5,000 5,000 48,569 6,969 36,600 5,000 48,569 5,000 Capital Expenditures: Design - 10,000 - - 10,000 Monitoring 1,868 5,000 5,000 5,000 11,868 Construction 5,101 21,600 - - 26,701 6,969 36,600 5,000 5,000 48,569 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Fund 124 Wetland Mitigation Account 5,000 5,000 5,000 5,000 30,000 5,000 5,000 5,000 5,000 30,000 Capital Expenditures: Design - - - - - Monitoring 5,000 5,000 5,000 5,000 30,000 Construction - - - - - 5,000 5,000 5,000 5,000 30,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project designs and constructs off-site wetland mitigation in the Auburn Environmental Park for participating development projects as approved through the City's development review process. Design, construction, monitoring, and maintenance of the mitigation is funded through wetland mitigation fees collected by the City. Progress Summary: Future Impact on Operating Budget: After construction, each wetland mitigation site will be monitored and maintained for a period of three to five years, depending on the specific requirements for the project. Funding for future year monitoring and maintenance is included in the development fees collected by the City, and is budgeted as part of the Capital Facilities Plan. Replacement plantings for Auburn Airport tree removal conducted in 2013. Design and construction of mitigation for other development sites deferred to 2021. Years 2019-2024 scheduled for site monitoring only. 219 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Auburn Environmental Park Boardwalk - Phase 2 Project No:cp1611 Project Type:Non-Capacity Project Manager:Jeff Tate Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total REET 2 - - - 75,000 - Other -TBD - - - - - - - - 75,000 - Capital Expenditures: Design - - - 75,000 - Construction - - - - - - - - 75,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: REET 2 - - - - 75,000 Other -TBD 800,000 - - - 800,000 800,000 - - - 875,000 Capital Expenditures: Design - - - - 75,000 Construction 800,000 - - - 800,000 800,000 - - - 875,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The Auburn Environmental Park (AEP) provides vegetated natural open space within an urbanized area. The AEP provides opportunities for local economic development, water quality improvement, storm water detention, flood control, fish and wildlife enhancement, visual resources, public education, and passive recreation, including walking trails and bird viewing amenities. In 2012, the City completed the construction of approximately 1,200 lineal feet of the first phase (Phase 1) of an elevated boardwalk trail in the Auburn Environmental Park (AEP). This trail extended from West Main Street through existing wetlands in the AEP terminating at the base of the Bird Viewing Tower constructed in 2009. As part of the construction of the elevated boardwalk, the City also installed interpretative signage, bench seating, limited new vehicle parking on Western Avenue and over two acres of wetland species of trees, plants and shrubs. Phase 2 of the elevated boardwalk trail would construct a combination of up to approximately 2,000 lineal feet of surface trail and elevated boardwalk trail from the current terminus at the Bird Viewing Tower to a connection with the Interurban Trail. The Phase 2 project will further previous and current Councils’ visions of the AEP providing passive recreation and environmental education opportunities for all Auburn citizens. Progress Summary: Design for this project is scheduled to start in fall of 2023. Future Impact on Operating Budget: Construction of the Phase 2 project is anticipated to incur approximately $10,000 in annual operating costs to the City’s operating budget. Operating costs are addressed in the Environmental Services portion of the Community Development and Public Works Department operating budget. 220 City of Auburn Capital Facilities Plan LOCAL REVITALIZATION FUND (330)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: City Downtown Public Parking Lot Reconfiguration Project No: cp1616 Project Type: Non-Capacity Project Manager: Ingrid Gaub Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Local Revitalization Fund 330 17,329 - 245,000 - 262,329 17,329 - 245,000 - 262,329 Capital Expenditures: Construction 17,329 - 245,000 - 262,329 17,329 - 245,000 - 262,329 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Local Revitalization Fund 330 - - - - 245,000 - - - - 245,000 Capital Expenditures: Construction - - - - 245,000 - - - - 245,000 Grants / Other Sources: Reconfigure the City owned public parking lot between Safeway and Main Street to address pedestrian and vehicular circulation; remove existing landscaping to allow more flexibility in the parking lot redesign; explore whether more parking stalls can be added to the lot to aid in providing additional customer parking within Downtown Auburn; and resurface the parking lot. Progress Summary: Monies to improve the parking lot adjacent to Safeway and the B Street Plaza were used to create safety and aesthetic improvements to the plaza. New catenary lighting and planters were added to the plaza as a short- to medium-term improvement. The lighting increases safety and the planters were added to delineate walking paths and create visual interest. Completion of design and construction is delayed until the Heritage Building is addressed. Future Impact on Operating Budget: None anticipated as the City already maintains the parking lot. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 221 City of Auburn Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Capital Projects Fund Project Title: Local Revitalization Project No: Project Type: Project Manager: Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total REET 2 452,400 153,300 152,300 150,800 758,000 452,400 153,300 152,300 150,800 758,000 Capital Expenditures: Long-Term Debt Service 452,400 153,300 152,300 150,800 758,000 452,400 153,300 152,300 150,800 758,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: REET 2 148,800 151,300 148,000 149,300 900,500 148,800 151,300 148,000 149,300 900,500 Capital Expenditures: Long-Term Debt Service 148,800 151,300 148,000 149,300 900,500 148,800 151,300 148,000 149,300 900,500 Grants / Other Sources: To pay debt service costs on 2010 General Obligation bonds issued for the Downtown Promenade improvements. Progress Summary: Future Impact on Operating Budget: N/A Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 222 City of Auburn Capital Facilities Plan TABLE CI-3 Impact on Future Operating Budgets Community Improvements . Project:2023 2024 2025 2026 2027 2028 Total 1 104th Ave. Park Development 12,500$ 12,500$ 12,500$ 12,500$ 12,500$ 12,500$ 75,000$ 2 AEP Boardwalk -Phase 2 - - 10,000 10,000 10,000 10,000 40,000 3 City Street Light LED Retrofit (150,000) (150,000) (150,000) (150,000) (150,000) (150,000) (900,000) Total (137,500)$ (137,500)$ (127,500)$ (127,500)$ (127,500)$ (127,500)$ (785,000)$ 223 City of Auburn Capital Facilities Plan 224 City of Auburn Capital Facilities Plan AIRPORT Current Facilities The City of Auburn operates the Auburn Municipal Airport, providing hangar and tie-down facilities/leasing space for aircraft-related businesses. As of 2017, there were approximately 142,000 take-offs and landings (aircraft operations) at the airport annually. Table A-1 “Facilities Inventory” lists the facilities with current capacity and location. The Airport Master Plan was completed in May 2015 for the period 2012 through 2032. Level of Service (LOS) The Auburn Municipal Airport Master Plan provides a maximum runway capacity (LOS standard) of 231,000 aircraft operations annually; one take-off or landing equals one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA). The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways, holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100% of aircraft operations during any one year. By 2022, the Airport Master Plan forecasts the number of operations to be 198,623 – well below the capacity of the airport runway. Capital Facilities Projects and Financing The City’s Airport facilities include ten non-capacity projects totaling $16,876,460. These include the Runway/Taxiway Rehab, RSA grading & Precision Approach Path Indicator (PAPI) project, open T-hangar upgrades, and Airport office/middle ramp reconfigure project. Table A-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table A-3 shows, operating budget impacts of $16,000 are forecasted for Airport facilities during the six years 2023 – 2028. TABLE A-1 Facilities Inventory Airport FACILITY # of Aircraft # of Feet LOCATION Existing Inventory: Hangars (Public)145 2143 E Street NE Hangars (Private)103 2143 E Street NE Tiedowns 153 2143 E Street NE Runway 3,841 2143 E Street NE Total Existing Inventory 401 3,841 Proposed Capacity Projects: Private Hangar Development 23 - 2143 E Street NE Total Proposed Capacity Projects 23 - 2027 Projected Inventory Total 424 3,841 CAPACITY 225 City of Auburn Capital Facilities Plan TABLE A-2 2022 2023 2024 2025 2026 2027 Total Capacity Projects: None - Page Non-Capacity Projects: 227 Annual Repair and Maintenance of Airport Facilities Capital Costs 75,000 500,000 100,000 200,000 238,800 246,000 1,359,800 Funding Sources: Airport Fund 75,000 500,000 100,000 200,000 238,800 246,000 1,359,800 Grants - - - - - - - 228 Jet A Fueling Facility Capital Costs - - 50,000 350,000 - - 400,000 Funding Sources: Airport Fund - - 25,000 175,000 - - 200,000 Other Agencies - - 25,000 175,000 - - 200,000 Grants - - - - - - - 229 AWOS, Beacon & Emergency Generator Capital Costs - - 111,110 1,000,000 - - 1,111,110 Funding Sources: Airport Fund - - 5,555 100,000 - - 105,555 Grants - - 105,555 900,000 - - 1,005,555 230 Annual Airport Pavement Maintenance Capital Costs 50,000 - 50,000 50,000 100,000 100,000 350,000 Funding Sources: Airport Fund 50,000 - 50,000 50,000 100,000 100,000 350,000 Grants - - - - - - - 231 Open T-Hangar Upgrades & Door Replacement Capital Costs 1,500,000 - - - - - 1,500,000 Funding Sources: Airport Fund 250,000 - - - - - 250,000 State Loan 750,000 - - - - - 750,000 Grants 500,000 - - - - - 500,000 232 Runway/Taxiway Rehab, RSA Grading & PAPI project Capital Costs 444,440 3,611,110 - - - - 4,055,550 Funding Sources: Airport Fund 22,220 180,555 - - - - 202,775 Grants 422,220 3,430,555 - - - - 3,852,775 233 Property Access to Airport Capital Costs - - - 50,000 - - 50,000 Funding Sources: Airport Fund - - - 50,000 - - 50,000 Grants - - - - - - - 234 Precision Instrument Approach Capital Costs 25,000 25,000 - - - - 50,000 Funding Sources: Airport Fund 25,000 25,000 - - - - 50,000 Grants - - - - - - - 235 Airport Office / Middle Ramp Reconfigure Capital Costs - 75,000 75,000 5,750,000 - - 5,900,000 Funding Sources: Airport Fund - 7,500 7,500 575,000 - - 590,000 Other Agencies - 67,500 67,500 5,175,000 - - 5,310,000 236 Airport Taxilane and Ramp Rehab Capital Costs - - - - - 2,100,000 2,100,000 Funding Sources: Airport Fund - - - - - 210,000 210,000 Grants - - - - - 1,890,000 1,890,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 2,094,440 4,211,110 386,110 7,400,000 338,800 2,446,000 16,876,460 Total Costs 2,094,440 4,211,110 386,110 7,400,000 338,800 2,446,000 16,876,460 FUNDING SOURCES: Airport Fund 422,220 713,055 188,055 1,150,000 338,800 556,000 3,368,130 Other Agencies - 67,500 92,500 5,350,000 - - 5,510,000 State Loan 750,000 - - - - - 750,000 Grants (Fed,State,Local)922,220 3,430,555 105,555 900,000 - 1,890,000 7,248,330 Total Funding 2,094,440 4,211,110 386,110 7,400,000 338,800 2,446,000 16,876,460 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING AIRPORT FUND 226 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Annual Repair and Maintenance of Airport Facilities Project No:apbd05, cp1931 Project Type:Non-Capacity Project Manager:TBD Description: Activity: (Previous 2 Years)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue 59,778 - 75,000 500,000 134,778 Grants (Fed,State,Local)- - - - - Other - - - - - 59,778 - 75,000 500,000 134,778 Capital Expenditures: Design 17,504 - 12,000 100,000 29,504 Right of Way - - - - - Construction 42,274 - 63,000 400,000 105,274 59,778 - 75,000 500,000 134,778 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue 100,000 200,000 238,800 246,000 1,359,800 Grants (Fed,State,Local)- - - - - Other - - - - - 100,000 200,000 238,800 246,000 1,359,800 Capital Expenditures: Design 20,000 40,000 45,000 45,000 262,000 Right of Way - - - - - Construction 80,000 160,000 193,800 201,000 1,097,800 100,000 200,000 238,800 246,000 1,359,800 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Due to the current conditions of the Facilities at the Airport, this program provides for necessary maintenance and repair work such as slab sealing, roof replacement, hangar beam replacement, painting, electrical repairs, etc. for buildings identified in the 2018 Facility Condition Assessment as being in "Fair" to "Good" condition. Repair and maintenance of these facilities will help prolong the service life of these buildings. Progress Summary: Program began in 2017. In 2018, a Facilities Condition Assessment was completed. Future Impact on Operating Budget: This project will decrease the need for more costly repairs and maintenance on older buildings. 227 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Jet A Fueling Facility Project No:apbd04 Project Type:Non-Capacity Project Manager:Ingrid Gaub Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - Other Agencies - - - State Grant -Unsecured - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue 25,000 175,000 - - 200,000 Other Agencies 25,000 175,000 - - 200,000 State Grant -Unsecured - - - - - 50,000 350,000 - - 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 50,000 350,000 - - 400,000 50,000 350,000 - - 400,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Construct any necessary site improvements to accommodate a temporary 2,000 gallon fueling truck for Jet A fuel on site in 2018. Design and Construct a permanent 12,000 gallon Fuel Tank for Jet A service at Airport in 2022 and 2023 after the runway extension is complete and demand for Jet A fuel is established. 50% split of funding between the airport and a private party. Progress Summary: Due to the minimal demand for Jet A and interest in private partner to install this project was moved 2024. Future Impact on Operating Budget: None 228 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: AWOS, Beacon & Emergency Generator Project No:cpxxxx Project Type:Non-Capacity Project Manager:Ingrid Gaub Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - - - - Federal - Non-Primary Entitlements - - - - - Federal- Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue 5,555 100,000 - - 105,555 Federal - Non-Primary Entitlements 100,000 200,000 - - 300,000 Federal- Unsecured - 700,000 - - 700,000 State Grant -Unsecured 5,555 - - 5,555 111,110 1,000,000 - - 1,111,110 Capital Expenditures: Design 111,110 160,000 - - 271,110 Right of Way - - - - - Construction - 840,000 - - 840,000 111,110 1,000,000 - - 1,111,110 Grants / Other Sources:Federal Aviation Administration and Washington State Department of Transportation Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will fund the environmental, design and construction of an Automated Weather Observation System (AWOS), Beacon and emergency generator. This will be funded at 90% by the FAA Progress Summary: After discussion with the FAA this project was expanded to include beacon and emergency generator expenses. Future Impact on Operating Budget: $2,000 annually for on-going maintenance and repair 229 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Annual Airport Pavement Maintenance Project No:apbd12 Project Type: Non-Capacity Project Manager: Tim Mensonides Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - 32,180 50,000 - 50,000 Grants (Fed,State,Local)- - - - - Other - - - - - - 32,180 50,000 - 50,000 Capital Expenditures: Design - 9,180 5,000 - 14,180 Right of Way - - - - - Construction - 23,000 45,000 - 68,000 - 32,180 50,000 - 82,180 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue 50,000 50,000 100,000 100,000 350,000 Grants (Fed,State,Local)- - - - - Other - - - - - 50,000 50,000 100,000 100,000 350,000 Capital Expenditures: Design 5,000 5,000 10,000 10,000 35,000 Right of Way - - - - - Construction 45,000 45,000 90,000 90,000 315,000 50,000 50,000 100,000 100,000 350,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will complete pavement maintenance and preservation activities for the Airport Runway, Taxiways and other paved surfaces at the Auburn Airport to maintain the facilities in adequate operational conditions Progress Summary: Future Impact on Operating Budget: None 230 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Open T-Hangar Upgrades & Door Replacement Project No:apbd14 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - 250,000 - 250,000 State Loan - - 750,000 - 750,000 Grants (Fed,State,Local)- - 500,000 - 500,000 Other (Public/Private Partnership)- - - - - - - 1,500,000 - 1,500,000 Capital Expenditures: Design - - 200,000 - 200,000 Right of Way - - - - - Construction - - 1,300,000 - 1,300,000 - - 1,500,000 - 1,500,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue - - - - 250,000 State Loan - - - - 750,000 Grants (Fed,State,Local)- - - - 500,000 Other (Public/Private Partnership)- - - - - - - - - 1,500,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - 1,300,000 - - - - 1,500,000 Grants / Other Sources: Due to the current conditions of the hangar facilities at the Airport, this program will replace or upgrade hangar facilities as they reach the end of their service life. A Facility Condition Assessment was completed in 2018. In 2019 an in depth analysis of the hangars' structure and roofing was conducted with a recommendation to not replace but upgrade the structures. The demand on the airport is greater for closed hangars vs open units. This project will convert 2 open hangar rows to closed hangars, and replace old doors on the airport's "H" hangar row. This will increase airport revenues at approximately $100,000 annually. This will allow for 2 open rows to remain on the airport and provide greater hangar options for airport tenants. Progress Summary: Project is scheduled to begin and be completed in 2022. Future Impact on Operating Budget: Utilization of 750K dollar low interest airport loan offered by WSDOT Aviation, Airport funds and an FAA grant. In 2023 hangar revenues increase $100,000 annually. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 231 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Runway/Taxiway Rehab, RSA Grading & PAPI project Project No:apbd13 Project Type: Non-Capacity Project Manager: Tim Mensonides Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - 22,220 180,555 22,220 Federal -Non Primary Entitlement - - 400,000 150,000 400,000 Grants unsecured -Federal - - - 3,100,000 - Grants unsecured - State - - 22,220 180,555 22,220 - - 444,440 3,611,110 444,440 Capital Expenditures: Design - - 444,440 350,000 444,440 Right of Way - - - - - Construction - - - 3,261,110 - - - 444,440 3,611,110 444,440 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue - - - - 202,775 Federal -Non Primary Entitlement - - - - 550,000 Grants unsecured -Federal - - - - 3,100,000 Grants unsecured - State - - - - 202,775 - - - - 4,055,550 Capital Expenditures: Design - - - - 794,440 Right of Way - - - - - Construction - - - - 3,261,110 - - - - 4,055,550 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will complete a Fog seal of on the Airport Taxiways to extend the life of the pavement and complete rehabilitation of the Runway to prolong the useful life of the Runway. This project will also complete necessary improvements to the property purchased from the Park and Ride to be in compliance with the FAA requirements for the Runway Safety Area. In addition the project will install Precision Approach Path Indicator (PAPI) for Runway to replace aging Visual Approach Slope Indicator (VASI) system. Progress Summary: After discussion with the FAA this project combined the Runway/Taxiway Rehab, the RSA Grading and the PAPI project into one project as part of the 2021 -2026 Capital Facilities Plan. Future Impact on Operating Budget: $2,000 annually for PAPI on-going maintenance and repair 232 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Property Access to Airport Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue - 50,000 - - 50,000 Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - - - - 50,000 - - 50,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - - - - - - 50,000 - - 50,000 Grants / Other Sources: Enter into a through the fence agreement for access to the Airport. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 233 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Precision Instrument Approach Project No:apbd15 Project Type:Non -Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - 25,000 25,000 25,000 Bond Revenue - - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - - - - - 25,000 25,000 25,000 Capital Expenditures: Design - - 25,000 25,000 25,000 Right of Way - - - - - Construction - - - - - - - 25,000 25,000 25,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue - - - - 50,000 Bond Revenue - - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - - - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - - - - - 50,000 Grants / Other Sources: Approval process with the FAA to improve the airport's instrument approach. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 234 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Airport Office / Middle Ramp Reconfigure Project No:cpxxx Project Type:Non -Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - - 7,500 - Bond Revenue - - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - 67,500 - - - - 75,000 - Capital Expenditures: Design - - - 75,000 - Right of Way - - - - - Construction - - - - - - - - 75,000 - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue 7,500 575,000 - - 590,000 Bond Revenue - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)67,500 5,175,000 - - 5,310,000 75,000 5,750,000 - - 5,900,000 Capital Expenditures: Design 75,000 - - - 150,000 Right of Way - - - - - Construction - 5,750,000 - - 5,750,000 75,000 5,750,000 - - 5,900,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will reconfigure the Airport office and parking lot area to allow for additional development of an Airport based aviation business /restaurant. 10/90% split with the airport and private party. Progress Summary: Future Impact on Operating Budget: None 235 City of Auburn Capital Facilities Plan AIRPORT FUND (465)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Airport Taxilane and Ramp Rehab Project No:cpxxx Project Type:Non -Capacity Project Manager:TBD Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Airport Revenue - - - - - Bond Revenue - - - - - Grants (Fed,State,Local)- - - - - Other (Public/Private Partnership)- - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Airport Revenue - 210,000 210,000 Bond Revenue - - - - Grants (Fed,State,Local)- - - 1,890,000 1,890,000 Other (Public/Private Partnership)- - - - - - 2,100,000 2,100,000 Capital Expenditures: Design - - 300,000 300,000 Right of Way - - - - - Construction - - 1,800,000 1,800,000 - - 2,100,000 2,100,000 Grants / Other Sources: Pavement rehab of airport's south hangar taxilanes. Pavement Condition Index for this area is 55 and 61. Last major maintenance on the pavement was preformed in 1972 (original construction). Progress Summary: Planning and FAA grant to cover 90% of project costs is scheduled Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 236 City of Auburn Capital Facilities Plan TABLE A-3 Impact on Future Operating Budgets Airport . Project:2023 2024 2025 2026 2027 2028 Total 1 Automated Weather Observation System, Beacon & Emergency Generator -$ -$ -$ 2,000$ 2,000$ 2,000$ 6,000$ 2 Precision Approach Path Indicator (PAPI) for Runway - 2,000 2,000 2,000 2,000 2,000 10,000 Total -$ 2,000$ 2,000$ 4,000$ 4,000$ 4,000$ 16,000$ 237 City of Auburn Capital Facilities Plan 238 City of Auburn Capital Facilities Plan CEMETERY Current Facilities The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (60 acres and five buildings) that provides burial services and related merchandise for the community. The Pioneer Cemetery is a historic cemetery that is no longer used for burial purposes. Table C-1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 32 burial plots/niches and cremation in ground plots per 1,000 population is based on the existing inventory divided by the estimated 2022 citywide population of 83,950. The proposed LOS of 30 burial and plots/niches and cremation in ground plots per 1,000 population is based on the projected inventory divided by the 2027-projected citywide population of 89,379. Capital Facilities Projects and Financing The City’s Mountain View Cemetery facilities includes one capital projects costing $355,000 to build a new mausoleum. Table C-2 shows the proposed financing plan followed by the worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecast for the cemetery during the six years 2023 – 2028. TABLE C-1 Facilities Inventory Cemetery CAPACITY FACILITY # of Plots/Niches LOCATION Existing Inventory: Mountain View Cemetery 2,624 2020 Mountain View Dr. Pioneer Cemetery - 8th & Auburn Way No. Total Existing Inventory 2,624 Proposed Capacity Projects: New Development - Burial Plots 96 Total Proposed Capacity Projects 96 2027 Projected Inventory Total 2,720 239 City of Auburn Capital Facilities Plan TABLE C-2 2022 2023 2024 2025 2026 2027 Total Page Capacity Projects: 241 Mausoleum Building Capital Costs - 355,000 - - - - 355,000 Funding Sources: Cemetery Fund - 355,000 - - - - 355,000 Cemetery Endowed Care - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - 355,000 - - - - 355,000 Non-Capacity Projects - - - - - - - Total Costs - 355,000 - - - - 355,000 FUNDING SOURCES: Cemetery Fund - 355,000 - - - - 355,000 Cemetery Endowed Care - - - - - - - Total Funding - 355,000 - - - - 355,000 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING CEMETERY FUND 240 City of Auburn Capital Facilities Plan CEMETERY FUND (466)Capital Facilities Plan Six Year Capital Facilities Plan, 2022-2027 Enterprise Funds Project Title: Mausoleum Building Project No:cp1831 Project Type:Capacity Project Manager:Craig Hudson Description: Activity: 2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Unrestricted Cemetery Revenue 2,250 46,673 - 355,000 48,923 Bond Proceeds - - - - - Cemetery Endowed Care - - - - - 2,250 46,673 - 355,000 48,923 Capital Expenditures: Design 2,250 46,673 - - 48,923 Right of Way - - - - - Construction - - - 355,000 - 2,250 46,673 - 355,000 48,923 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Unrestricted Cemetery Revenue - - - - 355,000 Bond Proceeds - - - - - Cemetery Endowed Care - - - - - - - - - 355,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 355,000 - - - - 355,000 This project will design and construct a 72 crypt and 48 niche mausoleum for above ground internment option. The public has expressed desire to have this option available as the current mausoleum is at capacity. Progress Summary: Project design is planned to be completed in 2021 and construction to begin in 2023. Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: 241 City of Auburn Capital Facilities Plan 242 City of Auburn Capital Facilities Plan FIRE PROTECTION Current Facilities The Valley Regional Fire Authority provides fire protection and rescue services to a 40-square mile area which includes the City of Auburn, the City of Algona, the City of Pacific and King County Fire Protection District 31. The Valley Regional Fire Authority operates out of five stations, which are manned 24 hours per day. The North Station #31 also serves as the department headquarters and includes a hose and training tower. Each station is assigned fire apparatus (Engines and Aid Vehicles). Table F–1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.20 fire apparatus per 1,000 population is based on the existing inventory (17 fire apparatus) divided by the 2022 citywide population estimate of 85,041. The proposed LOS of 0.20 fire apparatus per 1,000 is based on the 2027-planned inventory (18 fire apparatus) divided by the 2027-projected citywide population of 89,379. Capital Facilities Projects and Financing The Valley Regional Fire Authority includes one capital project at a cost of $1,200,000 for fire apparatus enhancements and improvements. Table F-2 shows the proposed financing plan followed by an individual worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for fire protection during the six years 2023 – 2028. 243 City of Auburn Capital Facilities Plan TABLE F-1 Facilities Inventory Valley Regional Fire Authority FACILITY Fire Apparatus Aid Vehicles LOCATION Existing Inventory: Stations: North Station #31 1101 'D' Street NE, Auburn First Line 2 1 Reserve - 1 South Station #32 1951 'R' Street SE, Auburn First Line 1 1 Reserve 1 1 Lakeland Station #33 500 182nd Ave E, Auburn First Line 1 - Reserve 1 - Lea Hill Station #34 31290 124th Ave SE, Auburn First Line 1 - Brush Truck 1 - Reserve 1 - GSA Station #35 2815 C St SW, Auburn Reserve 1 1 Pacific Station #38 133 3rd Ave SE, Pacific First Line 1 - Reserve 1 - Total Existing Inventory 12 5 Proposed Inventory Additions: First Line 1 - Total Proposed Capacity Projects 1 - 2027 Projected Inventory Total 13 5 CAPACITY 244 City of Auburn Capital Facilities Plan TABLE F-2 2022 2023 2024 2025 2026 2027 Total Capacity Projects: Fire Station Facility Relocation, Enhancements & Improvements Capital Costs 825,000 75,000 75,000 75,000 75,000 75,000 1,200,000 Funding Sources: Grants - - - - - - - Other Proceeds (VRFA)750,000 - - - - - 750,000 Impact/Mitigation Fees 75,000 75,000 75,000 75,000 75,000 75,000 450,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 825,000 75,000 75,000 75,000 75,000 75,000 1,200,000 Total Costs 825,000 75,000 75,000 75,000 75,000 75,000 1,200,000 FUNDING SOURCES: Grants (Fed,State,Local)750,000 - - - - - 750,000 Impact/Mitigation Fees 75,000 75,000 75,000 75,000 75,000 75,000 450,000 Total Funding 825,000 75,000 75,000 75,000 75,000 75,000 1,200,000 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING Valley Regional Fire Authority 245 City of Auburn Capital Facilities Plan Capital Facilities PlanValley Regional Fire Authority Six Year Capital Facilities Plan, 2022-2027 Project Title: Fire Station Facility Relocation, Enhancements & Improvements Project No:N/A Project Type:Capacity Project Manager:Mark Horaski Description: Activity: (Previous 2 Yrs.)2021 YE 2022 Year End Funding Sources:Prior to 2021 Estimate 2022 Budget 2023 Budget Project Total Grants - - - - - Other Proceeds (VRFA)- - 750,000 - 750,000 Impact/Mitigation Fees - 550,000 75,000 75,000 625,000 - 550,000 825,000 75,000 1,375,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Aerial Apparatus Acquisition - 550,000 825,000 75,000 1,375,000 - 550,000 825,000 75,000 1,375,000 Total 2024 2025 2026 2027 2022-2027 Funding Sources: Grants - - - - - Other Proceeds (VRFA)- - - - 750,000 Impact/Mitigation Fees 75,000 75,000 75,000 75,000 450,000 75,000 75,000 75,000 75,000 1,200,000 Capital Expenditures:- Design - - - - - Right of Way - - - - - Aerial Apparatus Acquisition 75,000 75,000 75,000 75,000 1,200,000 75,000 75,000 75,000 75,000 1,200,000 Facility Improvement projects are identified and prioritized annually and are subject to delay to accommodate emergency repairs. The Valley Regional Fire Authority includes one project for apparatus enhancements and improvements. Progress Summary: Fire mitigation and impact fees will be transferred to the Valley Regional Fire Authority to pay for apparatus enhancements and improvements. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: None 246 City of Auburn Capital Facilities Plan