Loading...
HomeMy WebLinkAbout05-17-2023 AgendaHEARING EXAMINER AGENDA May 17, 2023 5:30 P.M. City Council Chambers 25 West Main Street I.PUBLIC PARTICIPATION Public Participation Information The City of Auburn Hearing Examiner Meeting scheduled for Wednesday, May 17, 2023, at 5:30 p.m. will be held in person and virtually. To attend the meeting virtually, please click one of the below links, or call into the meeting at the phone number listed below: Join Zoom Meeting https://us06web.zoom.us/j/82454209597 Meeting ID: 824 5420 9597 One tap mobile +12532158782,,82454209597# US (Tacoma) +12532050468,,82454209597# US Dial by your location +1 253 215 8782 US (Tacoma) +1 253 205 0468 US 888 475 4499 US Toll-free 887 853 5257 US Toll-free Meeting ID: 824 5420 9597 Find your local number: https://us06web.zoom.us/u/kdjkUetrn6 CASE NO: PLT22-0003 - AllensAcres Preliminary Plat APPLICANT: Kevin Thomas, Senior Site Designer/Landscape Architect Oakpointe 3025 112th Avenue NE Suite 100 Bellevue, WA 98004 PROPERTY OWNER: Marilyn Hoksbergen 12627 SE 304th Street Auburn, WA 98092 REQUEST: Preliminary plat application to subdivide approximately 4.19 acres into 20 single-family residential lots in the R-5, Residential Zoning District. Hearing Examiner Agenda May 17, 2023 5:30 p.m. ________________________________________________________________________________ 2 PROJECT LOCATION: The project site is located south of SE 304th St., approx. 220 feet west of 127th Place SE, within NE¼ of Section 9, Township 21, Range 5. King County Assessor Parcel No. 0921059078, currently addressed as 12627 SE 304th St. PARCEL NO(S): King County Assessor Parcel No. 0921059078 EXHIBIT 1 AGENDA BILL APPROVAL FORM HEARING EXAMINER Agenda Subject/Title: PLT22-0003, AllensAcres Preliminary Plat Date: May 3, 2023 Department: Community Development Budget Impact: Current Budget: $0 Proposed Revision: $0 Revised Budget: $0 DESCRIPTION: Preliminary plat application to subdivide approximately 4.19 acres into 20 single-family residential lots in the R-5, Residential Zoning District. ADMINISTRATIVE RECOMMENDATION: Hearing Examiner to conduct a public hearing and approve the preliminary plat of AllensAcres with 17 conditions and the associated Engineering Deviation request. PROJECT SUMMARY: Preliminary plat application to subdivide approximately 4.19 acres into 20 single-family residential lots. The site is zoned R-5, Residential, which allows 4-5 dwelling units per acre. The proposed lots range in size from 4,755 square feet (sq. ft.) to 9,351 sq. ft. Roadways to be constructed include a 583 ft. extension of SE 305th St. (from The Alicias Division I subdivision) to form a cul-de-sac, two (2) new private access and utility tracts (C and D) stemming off of SE 305th St. Stormwater will be managed onsite via one stormwater detention pond (Tract A). City water and sewer will be extended through the site to service each lot. An existing wetland Category IV wetland and its associated buffer will be placed into a tract (Tract B). LOCATION: The project site is located south of SE 304th St., approx. 220 feet west of 127th Pl. SE, within NE¼ of Section 9, Township 21, Range 5. King County Assessor Parcel No. 0921059078, currently addressed as 12627 SE 304th St. APPLICANT(S): Kevin Thomas, Senior Site Designer/Landscape Architect, Oakpointe, 3025 112th Ave NE, Suite 100, Bellevue, WA 98004 PROPERTY OWNER(S): Marilyn Hoksbergen, 12627 SE 304th St., Auburn, WA 98092 Staff Member: Benert Date: May 3, 2023 Page 2 of 27 Subject Property and Adjacent Property Comprehensive Plan Designation, Zoning Classification and Current Land Use: Comprehensive Plan Designation Zoning Classification Current Land Use Project Site Single Family Residential R-5, Residential 5 Dwelling Units per Acre Single-family residence and associated accessory structures North Single Family Residential R-5, Residential 5 Dwelling Units per Acre SE 304th St. & Single- Family Residences South Single Family Residential R-5, Residential 5 Dwelling Units per Acre Single-Family Residences East Single Family Residential R-5, Residential 5 Dwelling Units per Acre Single-Family Residences West Single Family Residential R-5, Residential 5 Dwelling Units per Acre Single-Family Residences & Vacant land Excerpted Zoning Map: Staff Member: Benert Date: May 3, 2023 Page 3 of 27 Excerpted Comprehensive Plan Map: Staff Member: Benert Date: May 3, 2023 Page 4 of 27 2021 Aerial Vicinity Map: Staff Member: Benert Date: May 3, 2023 Page 5 of 27 Street Layout Map: SEPA STATUS: A Determination of Non-Significance (DNS) was issued under City File No. SEP22-0006 on April 10, 2023, see Exhibit 4. The comment period ended April 25, 2023 and the appeal period ended May 9, 2023. There was one public comment received along with the City responses are included as Exhibit 5. No appeal of the SEPA decision was received. FINDINGS OF FACT: Preliminary Plat Findings 1. Kevin Thomas, Senior Site Designer/Landscape Architect, with Oakpointe, on behalf of Marilyn Hoksbergen, Property Owner, submitted a Preliminary Plat application and associated SEPA application on March 29, 2022 to subdivide approximately 4.19 acres (referred to in this Staff Report as the “Site”) into 20 single-family residential lots, and four tracts; one new private access tract stemming off the cul-de-sac bulb of SE 305th St. (Tract D), one emergency/pedestrian private access tract connecting SE 305th St. and SE 304th St. (Tract C), one private critical areas tract (Tract B), and one public stormwater pond tract (Tract A). The site preparation and construction of the residential subdivision is, referred to in this Staff Report as the “Project”. Staff Member: Benert Date: May 3, 2023 Page 6 of 27 2. The Site consists of one parcel and is located in the Lea Hill neighborhood of the City, south of SE 304th St. and approximately 220 feet west of 127th Pl. SE. The Site is referenced by King County Tax Assessor Parcel No. 0921059078. 3. The Site is rectangular in shape, as shown and dimensioned here with the longer axis north- south: 4. The Site is bordered to the north by an existing “Minor Arterial” classified street (SE 304th St.). However, the main access will not be from SE 304th St. The main Project access will be by a road extension from a separate residential subdivision that is planned to the west, The Alicias Division I (“The Alicias”), which received civil permit (FAC20-0018) approval on July 28, 2022 but who’s construction has not been completed and has not applied for a final plat. Located within The Alicias, the new public road, 125th Pl. SE extends south from SE 304th St. approximately 157 feet (ft), then intersects with new public east-west road SE 305th Pl. The eastward extension of SE 305th Pl. within The Alicias will enter the west side of and will serve the subdivision of AllensAcres with full street improvements meeting “local residential” standards and will turn south and terminate in a cul-de-sac. Two (2) new private access tracts will be utilized, one stemming off the cul-de-sac of SE 305th St. for access to two residential lots and utilities (Tract D) and one tract that connects SE 305th St. to SE 304th St. for emergency/pedestrian access and utilities (Tract C). The Project will be dependent on The Alicias subdivision being constructed for access and utilities as proposed. For full size plans, see Exhibit 7. 288 ft. 288 ft. 633.27 ft. 633.16 ft. Staff Member: Benert Date: May 3, 2023 Page 7 of 27 5. The AllensAcres Preliminary Plat, Civil Plans, all associated application documents depict and callout the road extension from The Alicias with the naming “SE 305th Street”. The street name that was assigned for The Alicias is “SE 305th Place”. Road name assignments are formally determined in the civil review process. To be consistent with the city’s addressing grid and street naming system, the road extension through the Project may be named “SE 305th Place” in the future. To be consistent with the Project’s application materials, the road extension through the Project will be referenced as “SE 305th St.” throughout the Staff Report. 6. The Site currently has one single-family home and a three accessory garage and carport structures. The home and associated accessory structures will be demolished. The site is also currently served by an existing on-site septic system and well; the existing septic system and well will be field located and abandoned in accordance with Health Dept standards prior to commencement of grading activities. Per ACC 13.06.150(C)(D) the applicant will also be required to sign a service agreement transferring water rights (if appropriate) and prohibiting the future installation of an irrigation well. 7. The Site has a Comprehensive Plan designation of “Single Family Residential” and is currently zoned R-5, Residential Five Dwelling Units Per Acre, which has a density range of between 4 and 5 dwelling units per acre. Based on the Site size of approximately 4.19 acres, the density calculation would require between 17 and 21 lots. Per Auburn City Code (ACC) 18.02.065(A)(1)(a), when density calculations result in a fraction, fractions of one-half or above shall be rounded up. 8. The Project is subject to the zoning development standards for the R-5, Residential zoning district in effect at the time the Project application was considered “Complete” (i.e. vested). Per ACC 18.07.030 the zoning development standards for the R-5 zoning district include: • Minimum lot area: 4,500 square feet • Minimum lot width: 50 feet • Lot cot coverage: 40% • Impervious surface: 65% • Maximum building height: 35 feet • Minimum yard setbacks: o Front: 10 feet o Garage, Front: 20 feet o Side, interior: 5 feet o Side, street: 10 feet o Rear: 20 feet 9. Per ACC 18.52.020, for future development of homes two off-street parking spaces per single family residence is required. 10. The Site is located within the utility service areas of, and will be served by, City of Auburn for public water and sewer. City public water and sewer service will be extended from The Alicias subdivision located to the west within SE 305th St. and also connect back to SE 304th St through the private access Tract C. Staff Member: Benert Date: May 3, 2023 Page 8 of 27 11. The Site slopes down gradually varying from 5% to 25% from the northeast corner of the Site to the southwest corner. No area of the Site has been identified as “erosion prone” under the City’s critical area inventory mapping system. The Applicant has provided the City with adequate information to show that the project will be in conformance with the City’s Engineering Design Standards. Reference the Geotechnical Report (Exhibit 11). 12. The Site is located within Groundwater Protection Zone 4, the City’s least stringent classification. Therefore, no impacts are anticipated that cannot be mitigated by utilizing Best Management Practices (BMPs). As recommended in the Preliminary Stormwater Site Plan (Exhibit 12), stormwater runoff from the Project will be evaluated, treated, and detained in a stormwater detention facility (‘stormwater pond’) located in Tract A, in accordance with the Department of Ecology Stormwater Management Manual for Western Washington (SWMM) and Auburn Supplements. 13. The Site is not located within any shoreline designation. 14. The Site is not located in the regulatory floodplain per Federal Emergency Management Agency (FEMA) maps. 15. Per Wetland Delineation and Wildlife Habitat Assessment Report (Exhibit 9), there is one Category IV wetland with a habitat score of 3-5 located towards the center of the west border of the Site and extends offsite to the west. The Category IV wetland is approximately 3,610 square feet (SF) in total and the on-site portion of the wetland is approximately 392 SF. The on-site portion of wetland and its associated buffer are proposed to be contained within Tract B. Per ACC 16.10.090(E)(1), this classification of wetland requires a 40-foot buffer with minimization measures pursuant to ACC 16.10.090(E)(1)(a)(ii). The Project will apply the minimization measures to achieve a 40-foot buffer and provide approximately 4,819 square feet (SF) of buffer restoration with native trees and shrubs. Wetland buffer averaging pursuant to ACC 16.10.090(E)(1)(b) is proposed to reduce the buffer area by 537 square feet (SF) to accommodate a stormwater discharge structure. Therefore, an additional 1,551 SF of buffer area is proposed in compensation and will be enhanced within Tract B (reference Wetland Buffer Mitigation Plan, Exhibit 10). 16. There are no streams, state or federal candidate threatened, or endangered plant or animal species identified on the Site (reference the Wetland Delineation and Wildlife Habitat Assessment Report, Exhibit 9). 17. Per the Washington State Department of Archeology & Historic Preservation (DAHP) predictive model data, Washington Information System for Architectural & Archaeological Records Data (WISAARD) (https://dahp.wa.gov/wisaard), a portion of the site is located in a “Moderate Risk” area for archaeological resources and denotes that a cultural resources survey is “recommended”. Therefore, a Cultural Resource Assessment (Exhibit 14) was performed and shared with DAHP. 18. The construction of SE 305th Pl. within The Alicias subdivisions planned to the west of the Site, will provide access to 25 lots. This road is proposed to be extended east to provide access for the 20 lots of the subject Project. The result will exceed the city standard for local Staff Member: Benert Date: May 3, 2023 Page 9 of 27 residential streets of 30 lots permissible to be served by one road without an additional emergency vehicle access. 19. In accordance with Chapter 16.64A ACC, half-street improvements will be required on the south side on SE 304th St., including the right-of-way dedication, curb, gutter, sidewalks, street lighting, stormwater controls, and landscape strips to meet the City’s “Minor Arterial” standard. 20. To reduce or avoid temporary noise impacts associated with the Project, all construction shall occur between the hours of 7 AM and 7 PM on weekdays, and between 9 AM and 6 PM on Saturday and Sunday as required per ACC 8.28.010(B)(8). 21. To mitigate increased demand for parks created by the Project, the current park impact fee shall be assessed at the time of building permit issuance in accordance with Chapter 19.08 ACC ‘Parks Impact Fees’. 22. To mitigate increased demand for schools created by the Project, the current school impact fee shall be assessed at the time of building permit issuance in accordance with Chapter 19.02 ACC ‘School Impact Fees’. 23. To mitigate increased demand for fire/emergency services generated by the Project, payment of the fire impact fee in effect at the time of building permit issuance is required in accordance with Chapter 19.06 ACC ‘Fire Impact Fees’. 24. To mitigate increased PM peak hour trips generated by the Project, a traffic impact fee in accordance with the City of Auburn Traffic Impact Fee Schedule shall be assessed at building permit issuance in accordance with Chapter 19.04 ACC ‘Transportation Impact Fees’. 25. A combined Notice of Application, Notice of Public Hearing, and Determination of Non- Significance (DNS) was issued on April 10, 2023 (Exhibit 4). The notices were posted at the Site, mailed to property owners within 300 ft. of the Site, and published in The Seattle Times newspaper. 26. In response to the public notice the City received one comment letter from the Department of Archaeology and Historic Preservation as of May 3, 2023 (the date this Staff Report was finalized) on the project. The following list is Staff’s abbreviated summary of the comment(s) along with a short summary of the City’s response, if one was necessitated. The comment and response is included as Exhibit 6. a. Stephanie Jolivette (Local Governments Archaeologist, Department of Archaeology and Historic Preservation (DAHP): provided a letter that concurred with the findings of the Cultural Resource Assessment (Exhibit 14) prepared by WestLand Engineering & Environmental Services, Inc. dated July 22, 2022. In the letter, it was also recommended that a standard Inadvertent Discovery Plan is followed during all ground disturbing activities upon construction of the subdivision. Lastly, it was requested that any public comments about the Project received by the City from tribes be shared with DAHP. Staff Member: Benert Date: May 3, 2023 Page 10 of 27 City Response: Thanked DAHP for the public comment and confirmed that the City would share any public comments received by tribes would be shared with DAHP. Findings for Deviations to Engineering Standards 1. The applicant submitted two requests for “deviations” from the City of Auburn Engineering Design Standards (COADS) for the following: a. City File No. DEV22-0034 (Exhibit 15): Access Tract Design Speed (2022 COADS Section 10.05.7(6)): Approval to reduce the design speed for proposed Tract C shared access from 30 mph to 15 mph. b. City File No. DEV22-0036 (Exhibit 15): Design Speed and Horizontal Curve Radius (2022 COADS Table 10-1): Approval to reduce the design speed for SE 305th St. from 30 mph to 20 mph and have a 100-foot horizontal curve radius. 2. Deviations from the COADS and Standard Details are subject to approval of the Hearing Examiner per ACC 17.18.010(A) and COADS 1.04 which state (emphasis added): “ACC 17.18.010(A). The hearing examiner may approve a modification of any standard or specification established or referenced by Chapter 17.14 ACC or established or referenced in the city’s design standards or construction standards, upon making the findings of fact in ACC 17.18.030; provided, that the hearing examiner shall obtain the concurrence of the city engineer for any requests to modify any city of Auburn design or construction standard.” “COADS 1.04. For deviation applications that are associated with a preliminary plat application submitted in compliance with Chapter 17.10 ACC, the deviation application and a recommendation from the City Engineer must accompany the preliminary plat to the hearing examiner.” 3. The City Engineer’s recommendations for the two deviations are included under the separate: ‘Conclusions for Deviations to Engineering Standards’ below. CONCLUSIONS: Preliminary Plat Conclusions Per ACC 14.03.030, a preliminary plat is a Type III Decision, which are quasi-judicial final decisions made by the Hearing Examiner. ACC 17.10.070 ‘Findings of Fact’ lists the approval criteria for a preliminary plat. A comparison of the project’s relationship to the subdivision approval criteria is given below (in italics) followed by a Staff analysis: A. Adequate provisions are made for the public health, safety, and general welfare and for open spaces, drainage ways, streets, alleys, other public ways, water supplies, sanitary wastes, parks, playgrounds and schools; Staff Analysis: Adequate provisions are made for public health, safety, and welfare. No adverse impacts to the public health, safety and general welfare are anticipated from the Staff Member: Benert Date: May 3, 2023 Page 11 of 27 proposed subdivision. Staff offers the following analysis of each of subcategory listed in this criterion: Open Spaces: At less than 50 lots, the Project is not subject to any park dedication, open space, or clustering requirements under Title 18 ‘Zoning’ or Title 17 ‘Land Adjustments and Divisions’ (ACC 17.14.100). Drainage Ways: Through the civil plan review process, the stormwater runoff from the Project will be managed, treated, and detained in a stormwater pond located in Tract A, per the Department of Ecology Stormwater Management Manual for Western Washington (SWMM) and Auburn Supplements. Streets, Alleys, other Public Ways: The Project will be required to construct streets per ACC, Chapter 12.64A ACC ‘Required Public Improvements’, the City’s Engineering Design Standards, and the Comprehensive Transportation Plan. With the extension of SE 305th St. and the half-street improvements to SE 304th St., the City’s Transportation Division finds that there will be no decrease in the road network level of service (LOS) standard. Additionally, as provided in ‘Finding of Fact’ No. 24, each new residence will be required to pay the Traffic Impact Fee in place at time of building permit issuance. More specifically, roadways will be constructed concurrent with the plat as follows: 1. Half-street improvements in accordance with Chapter 12.64A ACC to the Site’s frontage on SE 304th St. 2. SE 305th St. will be extended eastward from The Alicias subdivision into the Site, curve to the south, and terminate in a cul-de-sac. Full street improvements to the city’s “local residential” standard will be required, including a full-width paved roadway (28 ft.), curb, gutter, sidewalks, street lighting, stormwater controls, and landscape strips. Parking may be allowed on one side of the road, which side is to be determined through the civil plan review process. Fifteen lots (Lot Nos. 1-3, 7-13, 16-20) will take direct access from this new public street. Five lots (Lot Nos. 4-6, 14, 15) will take direct access from two separate private access tracts (Tract C and Tract D) that take access from SE 305th St. 3. Tract C is proposed as a private access and utilities tract (joint use driveway) featuring a paved width of 20 feet (tract is 26.50 ft. in width). Pedestrian access from the Project to SE 304th St. is provided with curb and a 6-foot-wide sidewalk along the east side of Tract C. Curb and gutter will be constructed along the west side of Tract C. Three lots (Lot Nos. 4-6) will take access from this private access tract. A gate and fire agency knox lock will be located on the northern most portion of Tract C where the access tract connects to SE 304th St. to provide emergency access to the Project and prohibit non-emergency vehicular traffic. The gate will not impede the pedestrian access (sidewalk) and the pedestrian access is required to be ADA-compliant. The tract will be marked “No Parking” on both sides. Tract C will be owned and maintained by the HOA. An ingress and egress easement, or other instrument as approved by the City, over Tract C must be granted to the City of Auburn, for the purpose of providing emergency services and pedestrian access to SE 305th St. Staff Member: Benert Date: May 3, 2023 Page 12 of 27 4. Tract D is proposed as a private access and utilities tract (joint use driveway) featuring a paved width of 20 feet and curb along both sides (tract is 22 ft. in width). Two lots (Lot Nos. 14 and 15) will take access from this private access tract. The tract will be marked “No Parking” on both sides. Tract D will be owned and maintained by the HOA. 5. Pedestrian access will be provided through the plat from SE 305th St., through Tract C to SE 304th St. Access to the stormwater pond (Tract A) will be provided directly from SE 305th St. Based on the City’s Comprehensive Transportation Plan, Functional Roadway Classification Map, the extension of SE 305th St. will be a “Local Residential” street. Two Deviations from Engineering Design Standards have been requested. One request is to reduce the design speed for the proposed private access Tract C. A second request proposed to reduce the design speed for SE 305th St. and have a 100-foot horizontal curve radius. The City Engineer has conditionally recommended for approval; reference the “Conclusions for Deviations to Engineering Standards” below. Public Water: The Site is located in the City’s water service area. Adequate water service will be provided for the Project. Water will be extended through the plat from The Alicias subdivision to the west through SE 305th St. and looped back to the existing water main in SE 304th St. through Tract C. Public Sanitary Sewer: The Site is located in the City’s sewer service area. Adequate sanitary sewer service will be provided for the Project. Sanitary sewer service will be extended through the plat from The Alicias subdivision to the west through SE 305th St. and looped back to the existing sewer main in SE 304th St. through Tract C. Parks, Playgrounds: No parks or playgrounds are proposed for the Project and none are required under city code authority. Per ‘Finding of Fact’ No. 21, Park Impact Fees will be paid at the time of building permit issuance. The closest public-owned park is “Village Square Park”, which is located off of SE 310th St, south of the intersection of 124th Ave SE and SE 304th St. and is approximately 950 feet (or 0.18 miles) west of Lea Hill Elementary School. Village Square Park is approximately 0.98 acres in size, features a walking trail, swing set, small playground, and picnic benches and is 0.7 miles away from the Site (reference image below). Staff Member: Benert Date: May 3, 2023 Page 13 of 27 Schools: The Site is located within the Auburn School District (ASD) boundary. Per the School Access Analysis (Exhibit 13), students within the Project will attend: 1) Lea Hill Elementary School; 2) Rainier Middle School, and 3) Auburn Mountainview High School. Elementary students will walk to Lea Hill Elementary School via concrete sidewalk along the south side of SE 304th St. which will be constructed as part of the Project and The Alicias subdivision frontage improvements. The safe walking route will continue south on the east side of 124th Ave SE (from SE 304th St.) approximately 1,300 feet which consists of concrete sidewalk, then an 8-foot paved shoulder stretches approximately 1,030 feet until arriving at the elementary school. Middle School and High School students will be bussed from a bus stop located at the intersection of 127th Pl SE and SE 306th St. A safe walking route to the bus stop will be provided along the south side of SE 304th St. via the installation of sidewalk along the frontage of the Project and eastward to connect to the existing sidewalk at the intersection of SE 304th St. and 127th Pl. SE as part of required half-street improvements. Staff Member: Benert Date: May 3, 2023 Page 14 of 27 From this location there is existing sidewalk along both sides of 127th Pl. SE that was constructed with the plat directly to the east of the Site (Rainier Shadows plat, reference image below). This information was obtained from the “E-Link School/Transportation Information Portal” for the ASD. Staff therefore finds the Project meets this criterion, as conditioned herein. B. Conformance of the proposed subdivision to the general purposes of the comprehensive plan; Staff Analysis: The Project is consistent with the general purposes of the Comprehensive Plan. The Comprehensive Plan Map establishes the future land use designations for the City of Auburn. The designation of ‘Single Family Residential’ establishes areas intended for single family dwellings. The Comprehensive Plan Map depicts the Site as ‘Single Family Residential’. The Project will subdivide 4.19 acres into 20 single-family residential lots. Therefore, this Project meets the intent of the Comprehensive Plan by developing single family dwellings. Additionally, adequate City services and facilities can be provided to serve the plat. City of Auburn public utilities, such as sewer and water will be extended to serve the proposed Project. The Project will also provide adequate facilities for stormwater; all stormwater will be directed to the stormwater detention facility pond (‘stormwater pond’) located in the southwestern portion of the Site (Tract A).The stormwater pond will be Staff Member: Benert Date: May 3, 2023 Page 15 of 27 required to meet applicable code and engineering design standards, as conditioned below. SE 305th St., a “Local Residential” public street will be extended to serve the proposed Project. Sidewalks will be constructed on both sides of the extended road. The Project will connect pedestrians to SE 304th St. via private access and utilities Tract C. Pedestrian access will be enhanced along SE 304th St. by the dedication of right-of-way and construction of half-street improvements, which will include sidewalks. Public services such as the Auburn Police Department, Valley Regional Fire Authority, and the Auburn School District will also serve the proposed Project. Finally, impact fees including traffic, fire, parks, and school impact fees will mitigate respective impacts generated by the Project. The Project is also consistent with or implements the specific following goals, objectives, and policies of the Comprehensive Plan: Land Use Policies: “LU-5 New residential development should contribute to the creation, enhancement, and improvement of the transportation system, health and human services, emergency services, school system, and park system. This may be accomplished through the development of level of service standards, mitigation fees, impact fees, or construction contributions.” Capital Facilities “Objective 1.1. Ensure that new development does not out-pace the City's ability to provide and maintain adequate public facilities and services, by allowing new development to occur only when and where adequate facilities exist or will be provided, and by encouraging development types and locations which can support the public services they require.” Policies: “CF-1 Lands designated for urban growth by this Plan shall have an urban level of public facilities (sewer, water, storm drainage, and parks) prior to or concurrent with development.” “CF-2 Encourage development where new public facilities can be provided in an efficient manner.” “CF-4 If adequate facilities are currently unavailable and public funds are not committed to provide such facilities, developers must provide such facilities at their own expense in order to develop.” “CF-7 The City shall encourage and approve development only where adequate public services including police protection, fire and emergency medical services, education, parks and other recreational facilities, solid waste collection, and other governmental Staff Member: Benert Date: May 3, 2023 Page 16 of 27 services are available or will be made available at acceptable levels of service prior to project occupancy or use.” “Objective 1.2. To ensure that new developments are supported by an adequate level of public services through an effective system of public facilities.” Policies: “CF-10 Public facilities shall be provided in accord with the guidance of the Capital Facilities Plan or, as may be appropriate a system plan for each type of facility designed to serve at an adequate level of service the locations and intensities of uses specified in this comprehensive plan.” “CF-12 No new development shall be approved which is not supported by a minimum of facilities to support the development and that does not provide for a proportionate share of related system needs.” “Objective 1.3. To ensure safe and adequate water service, for both domestic and fire protection purposes, to meet the needs of the existing community and provide for its planned growth.” “CF-16 The City shall continue its policy of requiring that water system extensions needed to serve new development shall be built prior to or simultaneously with such development, according to the size and configuration identified by the Comprehensive Water Plan as necessary to serve future planned development. The location and design of these facilities shall give full consideration to the ease of operation and maintenance of these facilities by the City. The City shall continue to participate to the extent permitted by law, through direct participation, LIDs, and payback agreements, to assist in the financing of such oversized improvements. Wherever any form of City finance is involved in a waterline extension, lines that promote a compact development pattern will be favored over lines traversing large undeveloped areas with uncertain future development plans.” “Objective 1.4. To ensure the efficient transmission of sanitary sewage to the appropriate treatment and disposal facilities in order to meet the needs of the existing community and provide for its planned growth.” “CF-23 The City shall continue its policy of requiring that sewer system extensions needed to serve new development shall be built prior to or simultaneously with such development, according to the size and configuration identified by the Comprehensive Sewer Plan and Comprehensive Plan as necessary to serve future planned development. The location and design of these facilities shall give full consideration to the ease of operation and maintenance of these facilities by the City. The City shall continue to use, to the extent permitted by law, direct participation, LIDs and payback agreements to assist in the financing of such oversized improvements. Wherever any form of City finance is involved in a sewer line extension, lines that promote a compact development pattern will be favored over lines traversing large undeveloped areas where future development plans are uncertain.” Staff Member: Benert Date: May 3, 2023 Page 17 of 27 “Objective 1.6. To ensure that collection, conveyance, storage and discharge of storm drainage is provided in a sufficient and environmentally responsible manner, in order to meet the needs of the existing community and provide for its planned growth.” Policies: “CF-37 The City shall require developers to construct storm drainage improvements directly serving the development, including any necessary off-site improvements.” “CF-38 The City shall require that off-site storm drainage improvements needed to serve new development shall be built prior to or simultaneously with such development, according to the size and configuration identified by the Comprehensive Storm Drainage Plan as necessary to serve future planned development. The location and design of these facilities shall give full consideration to the ease of operation and maintenance of these facilities by the City. The City should continue to use direct participation, LIDs and payback agreements to assist in the financing of off-site improvements required to serve the development.” Transportation Plan “Street-17: Access Tracts may be permitted, as long as emergency access can be guaranteed at all times.” “Street-18: The local street network shall be developed to maximize the efficiency of the transportation network in residential areas and minimize through traffic in neighborhoods.  The internal local residential street network for a subdivision should be designed to discourage regional through traffic and non-residential traffic from penetrating the subdivision or adjacent subdivisions.  Where possible, streets shall be planned, designed and constructed to connect to future development.  When applicable, non-motorized paths shall be provided at the end of dead end streets to shorten walking distances to an adjacent arterial or public facilities including, but not 2020 Comprehensive Transportation Plan - Page 84 limited to, schools and parks.  Residential developments should be planned in a manner that minimizes the number of local street accesses to arterials and collectors.  To promote efficient connectivity between areas of the community, existing stub end streets shall be linked to other streets in new development whenever the opportunity arises and the resulting traffic volumes are not likely to exceed acceptable volumes as identified in the Auburn Engineering Design Standards.” “GMA-01: Require developments to construct or finance transportation improvements and/or implement strategies that mitigate the impacts of new development concurrent with (within 6 years of) development, as required by the Growth Management Act.” “Parking-02: New developments should provide adequate off-street parking to meet their needs.” Staff Member: Benert Date: May 3, 2023 Page 18 of 27 “ROW-01: The acquisition and preservation of right-of-way is a key component of maintaining a viable transportation system. Methods used to acquire and preserve right-of- way include:  Requiring dedication of right-of-way as a condition of development;  Purchasing right-of-way at fair market value; and  Acquiring development rights and easements from property owners.” “Ped-03: Require developers to incorporate pedestrian facilities into new development and redevelopment in conformance with the Auburn City Code.” Parks, Recreation, and Open Space Plan “PR-8 Park impact fees should be established that help fund the future development of new parks, park facilities, trails, and acquisition of open space that meet the needs of an increasing population.” C. Conformance of the proposed subdivision to the general purposes of any other applicable policies or plans which have been adopted by the city council; Staff Analysis: The preceding analysis for Criterion B demonstrates the Project’s consistency with the applicable policies and objectives of the Comprehensive Plans adopted by the City. The project is generally consistent with the policies of the Comprehensive Plan including the City of Auburn Land Use Plan, Capital Facilities Plan, Comprehensive Transportation Plan, and the Parks, Recreation and Open Space Plan. D. Conformance of the proposed subdivision to the general purposes of this title, as enumerated in ACC 17.02.030; Staff Analysis: The proposed subdivision meets the general purposes of Title 17 ACC ‘Land Adjustments and Subdivisions’. The AllensAcres Preliminary Plat is a 20-lot subdivision that is consistent with the R-5 zoning district. Adequate provisions for water, sewer, storm drainage, roads, and safe walking conditions will be provided with this Project. The plat has been processed and reviewed for conformity with Auburn City Code, city plans and policies, and engineering design standards. Below is a comparison of the Project’s consistency with ACC 17.02.030 and the specific purpose statements of the subdivision code (in italics) followed by a Staff analysis for each item. “The purpose of this title is to regulate the division of land lying within the corporate limits of the city, and to promote the public health, safety and general welfare and prevent or abate public nuisances in accordance with standards established by the state and the city, and to: A. Prevent the overcrowding of land; Staff Analysis: The Project meets the minimum and base density of the R-5 zoning district. As provided under ‘Finding of Fact’ No. 7, the R-5 zoning district has a density Staff Member: Benert Date: May 3, 2023 Page 19 of 27 range of between 4 and 5 dwelling units per acre. As the site is approximately 4.19 acres, which based on the density calculation requires between 17 and 21 lots. Per ACC 18.02.065(A)(1)(a), when density calculations result in a fraction, fractions of one-half or above shall be rounded up. As proposed the Project will contain 20 lots, which is within the required density range for the R-5 zoning district. Therefore, the Project will not create an overcrowding of the land. B. Promote safe and convenient travel by the public on streets and highways; Staff Analysis: The Project is extending the public street of SE 305th St. and constructing new pedestrian access tract (Tract C) to and through the Project and therefore will provide a means of safe and convenient travel via public routes. C. Promote the effective use of land; Staff Analysis: The Project is effectively developing the Site by maximizing the number of residential units that are allowed for the R-5 zoning district and that can be physically achieved on the Site considering required utility infrastructure and existing critical areas. D. Provide for adequate light and air; Staff Analysis: The Project will provide adequate light and air through the applicable setback and lot coverage development standards. E. Facilitate adequate provision for water, sewerage, storm drainage, parks and recreational areas, sites for schools and school grounds, and other public requirements; Staff Analysis: The Finding of Facts, and preceding analysis for Criteria A and B demonstrates the Project is providing adequate provisions for water supplies, sanitary wastes, drainage, roads, and other public requirements such as public health, safety, parks, and schools. F. Identify, preserve, and utilize native soils and/or vegetation for the purposes of reducing storm water discharges, promoting groundwater infiltration, and implementing the use of storm water low impact development techniques; Staff Analysis: The Site mildly slopes down from the northeast corner of the Site to the southwest corner, with slopes ranging from approximately 5% to 25%. With the exception of the area designated for the critical area tract (Tract B), the Site will be cleared of vegetation and graded in preparation of the placement of site improvements such as the extension of SE 305th St., creation of a stormwater detention facility, home sites, and the installation of utilities. Per the Geotechnical Report (Exhibit 11), structural fill and soil will be imported to the Site and reuse of any existing on-site fill will need to be evaluated in the field by a geotechnical engineer or engineering geologist. Further, to reduce stormwater discharges, areas of the Site will be revegetated. As proposed in the Preliminary Civil Plans and Conceptual Landscaping (Exhibit 8), landscape strips along SE 305th St. will contain seeded lawn and street trees. The area inside the stormwater facility will be seeded per Auburn Design Standards and the remaining area within the Staff Member: Benert Date: May 3, 2023 Page 20 of 27 pond tract (Tract A) that is located outside of the facility will be landscaped with native trees, shrubs, and groundcover plantings. Also, per the Wetland Buffer Mitigation Plan (Exhibit 10) the wetland and its associated buffer within the critical area tract (Tract B) will be enhanced and restored by planting native trees and shrubs. Finally, as required by the R-5 zoning district, the subsequent development of each lot will be held to a maximum of 40% lot coverage (building coverage) and 65% impervious surface coverage. G. Provide for proper ingress and egress; Staff Analysis: As demonstrated in the analysis for Criterion A, the Project will provide proper ingress and egress for each individual future home, and a pedestrian connection to SE 304th St. H. Provide for the expeditious review and approval of proposed land divisions which comply with this title, the Auburn zoning ordinance, other city plans, policies and land use controls, and Chapter 58.17 RCW; Staff Analysis: Staff has worked with the applicant to ensure a timely and comprehensive review of the Project. I. Adequately provide for the housing and commercial needs of the citizens of the state and city; Staff Analysis: The Project will eventually provide for 20 new single-family residences to serve future residents. J. Require uniform monumenting of land divisions and conveyance by accurate legal description; Staff Analysis: Upon final plat map review, the Project will be required to meet all applicable survey requirements. K. Implement the goals, objectives and policies of the Auburn Comprehensive Plan.” Staff Analysis: As analyzed in Criterion B, the Project successfully implements the Comprehensive Plan. Staff therefore finds the Project meets this criterion, as conditioned herein. E. Conformance of the proposed subdivision to the Auburn zoning ordinance and any other applicable planning or engineering standards and specifications as adopted by the city, or as modified and approved as part of a previously approved PUD; Staff Analysis: As analyzed in the ‘Preliminary Plat Findings’, above, the Project is able to meet applicable zoning and engineering standards, with the exception of the requested engineering deviations, which are discussed under ‘Conclusions for Deviations to Engineering Standards’ provided below. Staff Member: Benert Date: May 3, 2023 Page 21 of 27 The placement of homes will be required to meet the zoning development standards for the R-5 zoning district to which the Project is vested (reference ‘Finding of Fact’ No. 8). Staff therefore finds that the Project is able to meet this criterion, as conditioned herein. F. The potential environmental impacts of the proposed subdivision are mitigated such that the preliminary plat will not have an unacceptable adverse effect upon the quality of the environment; Staff Analysis: Per the Wetland Delineation and Wildlife Habitat Assessment Report (Exhibit 9) and as detailed in ‘Finding of Fact’ No. 15, there is one Category IV wetland and its associated buffer present on site that will be contained within Tract B. Per the Wetland Buffer Mitigation Plan (Exhibit 10) and as detailed in “Finding of Fact’ No. 15, adequate restoration and enhancement is proposed to allow buffer averaging pursuant to ACC 16.10.090(E)(1)(b) and utilize the minimum buffer width with minimization measures pursuant to ACC 16.10.090(E)(1)(a)(ii). Per the Wetland Delineation and Wildlife Habitat Assessment Report (Exhibit 9) and as detailed in ‘Finding of Fact’ No. 16, there are no streams, or state or federal candidate threatened or endangered plant or animal species identified on the Site. The Site is also located within Groundwater Protection Zone 4, which is the least stringent classification. With the utilization of Best Management Practices, it is anticipated that potential impacts to groundwater can be mitigated. A SEPA Determination of Non-significance was issued on April 10, 2023 for this Project. Compliance with the recommended conditions of approval, city code, and engineering design standards will ensure that the Project will not have an adverse impact on the environment. During civil plan review process, the Project will be reviewed in accordance with applicable local, state, and federal standards to ensure no unacceptable adverse impacts to the environment occur. Staff therefore finds the Project meets this criterion, as conditioned herein. G. Adequate provisions are made so the preliminary plat will prevent or abate public nuisances; Staff Analysis: Adequate provisions are made and will be made through the subsequent civil plan review process, so the proposed Project will prevent or abate public nuisances. As the Site is mainly undeveloped, there are no active code violation cases for the site and no known public nuisances. Staff therefore finds the Project meets this criterion, as conditioned herein. H. Lot configuration, street and utility layouts, and building envelopes shall be designed in a manner that identifies, preserves, and utilizes native soils and/or vegetation that are Staff Member: Benert Date: May 3, 2023 Page 22 of 27 integrated into a low impact development facility, consistent with the city’s adopted storm water management manual. Staff Analysis: As analyzed in Criteria A, B, and D above, the Project has been designed such that it will be consistent with the City’s Engineering Design Standards and the Department of Ecology Stormwater Management Manual for Western Washington (SWMM) and Auburn Supplements. Staff therefore finds the Project meets this criterion, as conditioned herein. Conclusions for Deviations to Engineering Standards Per ACC 17.18 ‘Modifications of Standards and Specifications’, the Hearing Examiner may approve a modification of any standard or specification established or referenced by Chapter 17.14 ‘Improvement Requirements – Subdivisions’, or referenced in the city’s design standards or construction standards. Further, the City Engineer shall make a recommendation to the Hearing Examiner on any modifications requested from the City of Auburn Engineering Design Standards (COADS). This process is referred to as a “Deviation” per Section 1.04 of the COADS. Two Deviations were requested: 1. City File No. DEV22-0034 (Exhibit 15): Tract Design Speed (2022 COADS Section 10.05.7(6)): Approval to reduce the design speed for proposed Tract C shared access from 30 mph to 15 mph. 2. City File No. DEV22-0036 (Exhibit 15): Design Speed and Horizontal Curve Radius (2022 COADS Table 10-1): Approval to reduce the design speed for SE 305th St. from 30 mph to 20 mph and have a 100 foot horizontal curve radius. The City Engineer has reviewed the Deviation Requests (DEV22-0034 & DEV22-0036) submitted for the AllensAcres Preliminary Plat (PLT22-0003). The results of that review are provided below. DEV22-0034: Applicant requests approval to reduce the design speed for proposed Tract C shared access from 30 mph to 15 mph. The request addresses specific criteria for deviation requests from Section 1.04 of the City of Auburn Engineering Design Standards (EDS) in the following way: - 1.04.01.A Functional intent of the design element: The functional intent of the design speed requirement is to provide road geometry that provides adequate sight distance for the anticipated vehicle speeds at a road segment. The location of this particular curve is within a proposed subdivision with short tangents preceding the curve in each direction, a round-a-bout in the proposed plat to the west, and a dead-end to the south within this proposed AllensAcres plat. Vehicles will either be stopped or reduced in speed at each of these locations, and they will not have enough road length to attain a design speed of 30 mph with normal driving behavior. The anticipated speed for this location is 10 mph, Staff Member: Benert Date: May 3, 2023 Page 23 of 27 and roadway elements designed for a 15 mph design speed are appropriate. It should also be noted that the City is currently pursuing an update to the 2023 Engineering Design Standards to specify a design speed of 15 mph for private access tracts. - 1.04.01.B Safety factors associated with the design element: Reducing the design speed to 15 mph for Tract C will provide a safer and more realistic speed for the future residents using Tract C. - 1.04.01.J Consistency with the Spirit and the Corresponding City Design Standards: The City of Auburn is updating the Engineering Design Standards in 2023 to specify a design speed of 15 mph for access tracts. This deviation request is consistent with the City’s future Engineering Design Standards. DEV21-0036: Applicant requests approval to reduce the design speed for SE 305th St. from 30 mph to 20 mph and have a 100 foot horizontal curve radius. The request addresses specific criteria for deviation requests from Section 1.04 of the City of Auburn Engineering Design Standards (EDS) in the following way: -1.04.01.A Functional intent of the design element: The functional intent of the design speed requirement is to provide road geometry that provides adequate sight distance for the anticipated vehicle speeds at a road segment. The location of this particular curve is within a proposed subdivision with relatively short tangents preceding the curve in each direction - a round-about in the proposed plat to the west, and a dead-end at the south within the proposed AllensAcres Plat. Vehicles will either be stopped or reduced in speed at each of these locations, and they will not have enough road length to attain a design speed of 30 mph and posted speed of 25 mph with normal driving behavior. The anticipated speed for this location is more likely 15 mph, and roadway elements designed for a 20 mph design speed are appropriate. - 1.04.01.B Safety factors associated with the design element: Reducing the design speed to 20 mph for the proposed SE 305th Street will be safer for residents of the subdivision. Reducing the design and posted speeds eliminates sight distance concerns with turning the 90-degree corner and approaching the cul-de-sac. - 1.04.01. L Supported by Published Industry Standards: Thee design speed proposed, the 100-foot radius provided is supported by Table 3-13b in the AASHTO Policy on Geometric Design of Highway and Streets (Green Book). City Engineer Response to Deviation Requests DEV22-0034 and DEV22-0036: • The City Engineer may grant a deviation from the EDS if the applicant demonstrates that the proposed deviation will meet or exceed the corresponding City standard for the criteria listed in Section 1.04.1 of the EDS. • In the case of the request to deviate from Section 10.05.7(6) of the EDS (DEV21-0034), the City Engineer has determined that the proposal meets or exceeds the corresponding City standards 1.04.01 A, B, and J for the reasons listed above. • In the case of the request to deviate from Table 10-1 of the EDS (DEV21-0036), the City Engineer has determined that the proposal meets or exceeds the corresponding City standards 1.04.01 A, B, and L for the reasons listed above. Based on the above, the request to deviate from Table 10-1 and Section 10.05.7(6) of the EDS, for DEV22-0034 is approvable and DEV21-0036 is conditionally approvable by Staff Member: Benert Date: May 3, 2023 Page 24 of 27 the City and will be recommended for approval to the Hearing Examiner, subject to the conditions of approval, below. STAFF RECOMMENDATION: Staff recommends approval of the AllensAcres Preliminary Plat and the Engineering Deviation requests (City File No. DEV22-0034 and DEV22-0036), subject to the information contained in this Staff Report, the attached exhibits, and the 18 recommended conditions of approval below. RECOMMENDED CONDITIONS OF APPROVAL FOR DEVIATIONS: 1. The application (City File No. DEV22-0034) is a deviation request from the City of Auburn Engineering Design Standards (COADS) Section 10.05.7(6) ‘Access Tract Design Speed’ to reduce the design speed for proposed Tract C shared access from 30 mph to 15 mph is approvable. The City Engineer recommends to the Hearing Examiner approval of DEV22- 0034. 2. The application (City File No. DEV22-0036) is a deviation request from the City of Auburn Engineering Design Standards (COADS) Table 10-1 ‘Design Speed and Horizontal Curve Radius’ to reduce the design speed for SE 305th St. from 30 mph to 20 mph and have a 100- foot horizontal curve radius. The City Engineer recommends to the Hearing Examiner approval of DEV22-0036 with the following conditions. Parking will be restricted along both sides of SE 305th St. where the horizontal curve exists. Centerline striping shall be provided in SE 305th St. in the location of the horizontal curve. RECOMMENDED CONDITIONS OF PRELIMINARY PLAT APPROVAL: 1. Adequacy of infrastructure to the proposed subdivision is dependent upon completion of infrastructure improvements of the adjacent subdivision that is between preliminary and final plat approval. The adjacent subdivision is as follows: The Alicias preliminary plat (City File No. PLT18-0005 and FAC20-0018). The subject subdivision application shall not be granted a notice to proceed for construction until the earlier of (1) final plat approval of The Alicias, or (2) a staff determination that connecting infrastructure on the adjacent subdivision of The Alicias has been completed and accepted (to the extent acceptance is required) by the City, or an alternative to completion and acceptance is provided that ensures adequate infrastructure to the satisfaction of staff. The staff determination for Option (2) shall be made in conjunction with the review of issuing a notice to proceed for construction. Applicant’s decision to proceed with construction under Option (2) shall be accompanied by a written acknowledgment that it is proceeding at its own risk. 2. Depending on status of Phase 1 of The Alicias preliminary plat (City File No. PLT18-0005 and FAC20-0018) and the timing of the AllensAcres civil permit application, the existing conditions survey will need to be updated to depict utility connections constructed within The Alicias plat to ensure connectively and continuity. 3. Depending on status of Phase 1 of The Alicias preliminary plat (City File No. PLT18-0005) and the timing of the AllensAcres civil permit application, the school walking route may need to be updated to depict the frontage improvements constructed with The Alicias plat. Staff Member: Benert Date: May 3, 2023 Page 25 of 27 4. Prior to City approval of the construction plans under the Facilities Extension Agreement (FAC), provide documentation of application to the Washington State Department of Ecology (WSDOE) for a Construction Stormwater Permit, as required for all projects over 1 acre in size. 5. Prior to final plat approval a note shall be placed on the Final Plat indicating that the AllensAcres HOA and its heirs and successors shall maintain those portions of Tract A (stormwater facility) and specifically the portions located outside the fenced pond boundaries, or if no fence is provided, outside the 10-year stormwater surface elevation, as determined by the City Engineer. Additionally, the Covenants, Conditions, and Restrictions (CC&Rs) to be reviewed by the City shall also address this maintenance responsibility. 6. All retaining walls must be spaced far enough from the subject property’s original property lines that the wall can be constructed and maintained without entering the adjacent properties north and/or south of the proposed plat. If an easement is required to construct or maintain the retaining wall an easement shall be obtained prior to City approval of the civil plans under the FAC from the adjacent property owner(s) to the north and/or south. Ownership and maintenance of all retaining walls must be addressed in the Covenants, Conditions, and Restrictions (CC&Rs) for the AllensAcres Plat. 7. A Final Wetland Mitigation Plan and including monitoring must be approved prior to approval of the civil plans under the Facility Extension Agreement (FAC). Required vegetation must be installed prior to approval of the Final Plat. 8. The Category IV wetland (Wetland A) is utilizing a 40 ft. buffer per the minimization measures of ACC 16.10.090(E)(1)(a)(ii). These minimization measures must be listed on Final Wetland Mitigation Plan. 9. Slopes in the wetland buffer cannot exceed 25 percent (4H:1V). The Final Wetland Mitigation Plan will need to confirm that wetland buffer slopes do not exceed 25 percent. 10. The areas within the sensitive area tract (Tract B) but outside of the wetland buffer shall be vegetated to maintain slope stability. The vegetation type and spacing shall be included in the Final Wetland Mitigation Plan. 11. Prior to City approval of the civil plans under the FAC, the plans shall show permanent split rail fence or city approved equivalent and critical area signs along the outer boundary of the sensitive area tract (Tract B). 12. The sensitive area tract (Tract B) will be owned and maintained by the future AllensAcres Homeowner’s Association (HOA). The Covenants, Conditions, and Restrictions (CC&Rs) to be reviewed by the City shall address this maintenance responsibility. 13. Prior to final plat approval a note shall be placed on the Final Plat providing for the long-term protection of the wetland and its associated buffer (Tract B). The note shall grant the City access to on-site mitigation areas for the purposes of monitoring, maintaining, preserving, and enhancing the sensitive area, but not the obligation to. The note shall also include a Staff Member: Benert Date: May 3, 2023 Page 26 of 27 statement to leave undisturbed all trees and other vegetation within the sensitive area tract. The vegetation may not be cut, pruned, covered by fill, removed, or damaged without approval in writing from the City, unless otherwise approved by law. 14. The access and utilities tracts (Tract C and D) will be owned and maintained by the future AllensAcres HOA. The Covenants, Conditions, and Restrictions (CC&Rs) to be reviewed by the City shall address this maintenance responsibility. 15. Per the Department of Archaeology & Historic Preservation’s recommendations, a standard Inadvertent Discovery Plan shall be followed during all ground disturbing activities during the construction of the Project. 16. Per the Checklist, Section C, Item 12, occupation features (i.e. fences, sheds, etc.) affecting all boundaries between the subject sites and adjoining parcels are shown and dimensioned. Any potential adverse claims and/or unwritten rights associated with the depicted occupation features is a civil matter between private parties. It is suggested the applicant, or their authorized representative, establish communication with the adjoiners to create an open discussion regarding the occupation features. The City’s review of this preliminary plat application is for its conformity to Auburn City Code and state law, and as such does not address nor adjudicate any potential unwritten rights that may be acquired by the applicant or the adjoiners. If at FINAL PLAT application, the nature and location of the depicted occupation features remain unchanged and/or unresolved, then per RCW 58.17.255, a “survey discrepancy note” shall be placed on the face of the FINAL PLAT similar to the following example: SURVEY DISCREPANCY NOTE: EXISTING FENCES AND OCCUPATION FEATURES HAVE BEEN SHOWN PURSUANT TO RCW 58.17.255 AND SHALL BE DISCLOSED IN THE TITLE REPORT PREPARED BY THE TITLE INSURER AND ISSUED AFTER THE FILING OF THIS PLAT Staff reserves the right to supplement the record of the case to respond to matters and information raised subsequent to the writing of this report ATTACHMENTS: Exhibit 1. Staff Report Exhibit 2. Vicinity Map Exhibit 3. Completed Preliminary Plat Application Forms, prepared by Oakpointe, March 29, 2022 Exhibit 4. Combined Notice of Application, SEPA DNS, and Notice of Public Hearing, April 10, 2023, and completed SEPA Checklist application, January 31, 2023 Exhibit 5. Signed Affidavits of Posting and Mailing Exhibit 6. Written Comment(s) Received and City Response(s) Exhibit 7. Preliminary Plat Map and Existing Conditions, Lanktree Land Surveying, Inc, February 17, 2023 Exhibit 8. Preliminary Civil Plans and Conceptual Landscaping, Momentum Civil, February 17, 2023, and Oakpointe Communities, January 31, 2023 Staff Member: Benert Date: May 3, 2023 Page 27 of 27 Exhibit 9. Wetland Delineation and Wildlife Habitat Assessment Report, Wetland Resources Environmental Consulting, January 30, 2023 Exhibit 10. Wetland Buffer Mitigation, Wetland Resources Environmental Consulting, January 30, 2023 Exhibit 11. Geotechnical Report, Associated Earth Sciences, May 25, 2022 Exhibit 12. Preliminary Stormwater Site Plan, Momentum Civil, December 20, 2022 Exhibit 13. School Walkway Analysis, Momentum Civil, December 22, 2022 Exhibit 14. Cultural Resource Assessment, WestLand Engineering & Environmental Services, Inc., July 22, 2022 August 13, 2019 Exhibit 15. Engineering Deviation Request Letters, Momentum Civil, July 28, 2022 Exhibit 16. City Staff PowerPoint Presentation Prepared by Nicole Benert, Planner