HomeMy WebLinkAboutComercial Building Permit Checklist dress: ________________________________ Parcel No.:__________Applicant Name:______________________________ Project Name:_______________ Commercial Building Permit Application ChTo obtain a building permit for new commercial cons 􀂆 Complete Building Permit Application – missing information will cause the a 􀂆 Site plan – submit eight copies 􀂆 Vicinity Map 􀂆 Landscape Plan (see landscape plan requirements at Auburn City􀂆 A landscape plan has already been submitted to the City and approveExtension Review (FAC) Grading -If your project meets any of the following criteor at the time of a building permit application, see ACC 15.74 for exemptions from ments. require than 6 trees per lot or acre. 􀂆 Removal of more􀂆 Excavations exceeding 5 feet or fills exceeding 8 inches in vercubic yards 􀂆 Temporary stock piling of material. 􀂆 Broadcasting of material fo􀂆 Temporary stockpiling, up to 24 months, of organic or inorganic materialswith an approved construction project which was notpplication Required GRA#________________________ 􀂆 Grading Permit A􀂆 Grading Pe Page 1 H:\Permit Center\Commercial Building Permit Checklist.doc 3/4/2010 􀂆 Floor framing plan. 􀂆 For multiple-story buildings cross sections and s􀂆 Design professional (if app 􀂆 Deferred Permit Submittals Proposed: 􀂆 Plumbing Fire Critical Areas DeterminatCritical Areas Suspected or kn􀂆 Geologic Hazard􀂆 Wildlife Habitat Area􀂆 Wetlands 􀂆 Flood Hazard Area􀂆 Groundwater Protection Area 􀂆 Stream (and River) Critical Area Reports completed or required*: 􀂆 Geologic Hazard Critical Area Report 􀂆 Base Flood Elevation Certificate 􀂆 Construction Stormwater Pollution Prevention􀂆 Other Critical Area Repor*Subject to verification by Planning Department Staff. 􀂆 Critical Area (Wetland 􀂆 Fees The building permit plan review fee is dueat the time of permit issuance. There may be other permit fees associated with applications Utihequired permits) lity Connection Permit Application Form (see below for otr re􀂆 Water Service Connection 􀂆 Sanitary Sewer Service Connection Public Facilities: City of Auburn Utility Availability Form is attached Page 2 H:\Permit Center\Commercial Building Permit Checklist.doc 3/4/2010 serves the subject property, an availabaccompany the building permit application to the City. Is an Availability Yes, an Availability Certificate is attached from the following p No Is the property proposed to be served for sewer Yes, Health Department Approval is at No Is the property proposed to be serve Yes, a copy of the recorded well covenant is attached. 􀂆 No, the Other Agency Certification is not required. 􀂆 The storm permit is issued with the Building Permit. The storm systembuilding plans unless a facility extension (FAC) is required for the projemust be shown on the FAC plans. There are three levels for a storm permit: oes your project increase or replace less than 2,0qua Yes, a copy of the Level 1 Storm Permit is attached STM# No 2. For sites that increase or replace 2000-5000 square feet of imsquare feet or more of land disturbing activity requireLeve Yes, a copy of the Level 2 Storm Permit is attached STM 3. For sites that increase more than 5,000 square feet of impervious suracres or more of of native vegetation to lawn/landscaped area or converts 2.5 acres or more of AND the value of improvements exceed 50% of the accesimprovements requires a Level 3 Storm Permit. Yes, a copy of the Level 3 Storm Permit is attached STM# No Page 3 H:\Permit Center\Commercial Building Permit Checklist.doc 3/4/2010 Page 4 H:\Permit Center\Commercial Building Permit Checklist.doc 3/4/2010 ns pplication is not required traffic ana u 􀂆 No, a Facility Eion A alysis reqired? xteIs Yes, and is attached No Extension application is not required, does the poedrklulity Yes , a Special Permit is required and has been applied for: SPC# No City’s right-of-way beyond those covered by a Special Permit above? Yes , No 􀂆 Temporary Erosion Control for Small Sites – The applicant has beehandout, if applicable.