Loading...
HomeMy WebLinkAboutCTP_Final_2012 Chpt 3-7.pdfComprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-1 CHAPTER 3. NON-MOTORIZED TRANSPORTATION Non-motorized transportation is an integral component of Auburn’s transportation system. Non-motorized travel includes walking, bicycling, and equestrian travel, as well as emerging modes. The City seeks to enhance the non-motorized travel environment both for recreational travel and trips that might otherwise be taken via a car or bus in order to improve mobility and environmental health. The City recognizes that the evolution of the transportation system has favored the automobile as a mode of travel. A side effect of this process has been the erosion of conditions favorable to non-motorized travel. This chapter seeks to expand travel choices by fostering conditions in which non- motorized modes are a realistic and attractive travel option. Planning and developing a strong non- motorized network supports several state and national acts, including Washington’s Growth Management Act, Clean Air Act, and Commute Trip Reduction Act, and the federal Clean Air Act, the Americans with Disabilities Act (ADA), and the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) and its successors. Supporting the non-motorized system helps ensure compliance with these initiatives and the healthy community principles espoused by PSRC through the Destination 2030 update process and Vision 2040. It also increases funding opportunities for City projects. This chapter is divided into three subsections: pedestrian travel, bicycle travel, and equestrian travel. Each subsection contains an assessment of existing conditions and needs, followed by guidelines for development of the future system. 3.1 Pedestrian Travel As an urban center, the City encourages transportation planning that emerges from a clear land-use plan based on a community vision. In this vision, Auburn supports higher density housing in the downtown; neighborhood commercial districts; and landscaped, pedestrian-oriented street and sidewalk design. This pattern of development reinforces a positive pedestrian environment. NEEDS ASSESSMENT Auburn has many assets, which contribute to a welcoming pedestrian environment, most notably a pedestrian-scaled downtown and an extensive network of parks and trails. The Riding on the Interurban Trail Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-2 needs assessment highlights these existing assets and identifies improvement needs. EXISTING PEDESTRIAN ENVIRONMENT  As a whole, Auburn’s urban fabric in the downtown has remained intact and supports a positive pedestrian environment. Businesses, shops, and single-family homes front streets with sidewalks and street trees. However, over time surface parking lots have replaced some of these buildings, leaving large expanses of asphalt in portions of the downtown. These environments tend to discourage walking. In addition, some of the older sections of sidewalks need repair or replacement. Since adoption of the 1997 Transportation Plan, there have been improvements to Main Street, the B Street SE Plaza, and pedestrian improvements behind the shops on East Main Street. In addition, the new Sounder commuter rail station and transit hub at West Main Street and C Street SW provide pedestrians more options for connecting to regional destinations. These improvements contribute to a more hospitable environment for pedestrians. Commercial development outside the downtown exists primarily along arterials and is dominated by strip development and auto- oriented businesses. Although sidewalks are provided on most arterials, pedestrians may feel exposed to the traffic. Surface parking lots border the sidewalks, and driveways interrupt the continuity of the sidewalk system. The heavy volumes of vehicular traffic and wide streets along arterials, such as Auburn Way, pose a barrier for pedestrians walking along or crossing the roadway. Two particularly problematic locations are the midblock crossing between Dogwood Street SE and Hemlock Street SE at Auburn Way South, and 26th Street NE at Auburn Way North. Sidewalk Inventory A sidewalk inventory was conducted as part of the Plan update in 2005. A subsequent inventory was conducted in 2008 to collect sidewalk data for the West Hill and Lea Hill areas that annexed into the City in 2008. The inventory identifies sidewalks in the City, as shown in Figure 3-1. The inventory also rates their condition. This inventory will help the City identify problem areas and program improvements according to prioritization guidelines, outlined later in this chapter. The following paragraphs describe the survey and other findings. The older residential neighborhoods tend to have sidewalks on both sides of the street, but they vary widely in condition and construction standards. Some residential areas, such as southwest Lea Hill, were built under King County’s jurisdiction and sidewalk construction was not required. Breaks in the sidewalk network require pedestrians to maneuver around parked cars, into private yards, or into the street. In newer neighborhoods such as Lakeland Hills, Crosswalk with Pedestrian Refuge 3rd Street NW at Auburn Post Office Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-3 sidewalks built to current standards are provided on both sides of the street. The sidewalk survey of the Lea Hill and West Hill annexation areas reveals a sporadic and often disconnected sidewalk system. Several of the newer residential developments have sidewalks, but many of the older residential areas and arterial streets are missing large segments of sidewalk, resulting in a poor pedestrian environment. Trail Network Auburn’s developing trail network provides local and regional connections for recreational use, commuting and travel in general. Currently the only regional trails that have been developed include the Interurban and portions of the Green River and White River Trails. The Lakeland Hills Trail provides residents in the neighborhood a connection to Sunset Park. Figure 3-1 summarizes the existing pedestrian infra- structure within the Auburn city limits. SCHOOL ACCESSIBILITY  School safety is a major concern for parents, students, the school districts, and the City alike. The Auburn School District, working with an advisory committee, has established a safe walking area for each elementary and middle school based on the presence of sidewalks, walking paths, and safe neighborhood streets, as well as the availability of safe street crossings and the traffic conditions in the surrounding neighborhoods. All routes within the safe walking areas are designated as ‘Safe Routes to School’. Occasionally, individual schools will notify parents and students of preferred walking routes within each area. Recently, several safety improvements have been made to Safe Walking Routes throughout Auburn. Olympic Middle School now has a non-motorized path on H Street SE adjacent to the school, flashing beacons on 17th Street SE and 21st Street SE, as well as new crosswalks at several locations. These improvements were made possible by a Safe Routes to School grant. The City has also been steadily working on placing flashing beacons on Safe Walking Routes for public schools in Auburn. The flashing beacons have been funded through a combination of grant programs and City resources. Despite the progress that has been made over the past several years, there are still areas of need. The following issues and needs were identified to enhance and improve the safety for school children in and around the school safe walking areas. Cascade Middle School The crossing at M Street NE and 24th Street NE experiences heavy traffic. The City and school district are working to increase the safety of this crossing near the school. Dick Scobee Elementary School The “River Bend” or “River View” neigh- borhood has indirect access to the school as pedestrians must exit the neighborhood to the east via Riverview Drive, the opposite direction of the school. Furthermore, heavy vehicular traffic on 22nd Street NE makes it unsafe to cross M Street NE at that intersection. The School District is exploring ways to improve access and make the neighborhood part of the school’s safe walking area. One possible solution would be to obtain an easement and construct a pedestrian path from the neighborhood to 14th Street NE. Pedestrian improvements are also needed along K Street NE from Harvey Road NE to 14th Street NE. Pioneer Elementary School K Street SE, located behind the school, has poor drainage. During the rainy season, an area between the school building and the road Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-4 floods, blocking the school entrance with water. This area is part of the designated safe walking area, and the flooding prohibits 50 to 75 students from accessing their walking route to and from school on rainy days. Terminal Park Elementary School There is a natural tendency for kids to walk from Terminal Park Elementary to Holy Family School and Olympic Middle School. A pedestrian trail that connects these three schools would provide a direct route for pedestrians. Evergreen Heights Elementary School The area around Evergreen Heights Elementary School, including S. 316th Street, 56th Avenue S., and 51st Avenue S., has incomplete pedestrian facilities. In addition, residents have noted that South 316th Street needs improved speed enforcement. Hazelwood Elementary School Sections of SE 304th Street near Hazelwood Elementary School are missing sidewalks. Lea Hill Elementary School There is a need for sidewalks along 124th Ave SE north of SE 310th Street, and along SE 312th St in vicinity of 124th Ave SE. Mountain View High School There is a need for sidewalks along 124th Ave SE where missing near school, especially between SE 288th St and SE 304th St, and along 132nd Ave SE between SE 288th St and SE 299th St. Auburn will continue to work with the Auburn School District, and other school districts within its limits and potential annexation areas to improve school walk routes. Riverside High School & Ilalko Elementary While they are not within the Safe Walking Route areas, students on the north side of the White River attend both Riverside High School and Ilalko Elementary. The completion of a White River/A Street SE pedestrian crossing would greatly benefit student at these two schools. Currently, the closest route to reach these two schools requires children to walk north to 41st/Ellingson Road. ACCESSIBLE ROUTES OF TRAVEL  The Americans with Disabilities Act (ADA) requires that all new public, commercial and institutional developments meet ADA standards. Furthermore, existing public buildings, public outdoor facilities, and public rights-of-way shall be retrofitted to achieve accessibility. An accessible route of travel is designated to accommodate the needs of many different people, including those who are blind, using wheelchairs, pushing a stroller or cart, or injured. The law requires that municipalities have a transition plan in place to address ADA issues. The City of Auburn details the ADA design specifications in the Auburn Engineering Design Standards manual. Safe Walking Route to School Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-5 SITE DESIGN   Pedestrian conditions should be evaluated at the earliest stage of new development. The zone between the development and the public right-of-way needs to contribute to pedestrian network connectivity and continuity. In addition to the public right-of- way, the interior of the site ought to be examined for suitable pedestrian circulation. Wherever possible, walkways should be placed along the most direct routes to connect buildings, parking, bus stops, and other attractions. In some cases, walking trails that link residential streets to collectors or arterials can provide a more direct pedestrian connection than travel along the sidewalk network, particularly in neighborhoods without a street grid system. FUTURE SYSTEM This section describes the City’s vision for the future pedestrian system and identifies programs and initiatives that will enable it to achieve this vision. DOWNTOWN  The downtown is historically the social heart of the community, a place for people to interact. It is considered one of the primary pedestrian-oriented areas in the City. Important existing pedestrian downtown linkages include connections from W Main Street to the transit hub and commuter rail station, and between W Main Street and the Auburn Regional Medical Center. The Downtown Plan, a special area plan adopted in 2001 as part of the City’s Comprehensive Plan, anticipates high pedestrian oriented developments in this area, particularly around the Auburn Transit Center. The Downtown Plan also identifies W Main Street, A Street SW, Division Street, and the alley south of Main Street as high priority pedestrian corridors. In addition, several recently ADA Standards The ADA has several requirements to help ensure ease of access for all non-motorized travelers, including those in wheelchairs and motorized scooters. Some of these requirements are as follows.  In most cases, a minimum 3-foot wide clear zone must be provided along a route with obstacles.  Railings should be between 34” and 38”. If children are the primary users of a facility, a 2nd set of handrails, no taller than 28”, should be installed.  Generally, grades along an accessible route walking path should not exceed 1:20 or 5%. Ramp slopes should not exceed 1:12 or 8.33% in new facilities.  If a designated accessible route has a grade greater than 5%, it is considered a ramp and must have handrails and landings. Source: ADA and Architectural Barriers Act (ABA) Guidelines, http://www.access- board.gov, 2004. *Note these standards change regularly and should be confirmed before applying them to a sitedesign. West Main Street, Downtown Auburn Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-6 completed projects have helped improve non-motorized access to the downtown and transit station, including the West Main Street Streetscape project, completed in 2007, and the A Street SE Pedestrian Improvement project, designed to improve ADA access under the railroad bridge just north of 6th Street SE and completed in 2009. A Downtown Circulation planning process is also underway. This effort will provide guidance for further enhancement of the pedestrian and bicycling environment in downtown Auburn. The Sound Transit commuter rail station and transit hub have created demand for new mixed-use development, including retail and living spaces. The City is committed to focusing new commercial and residential development within walking distance of the transit hub and has been working on partnerships to bring several mixed-use developments to the downtown core. These development provide an opportunity to establish pedestrian friendly design, streetscape improvements (including street furniture), and improved street crossings along streets exterior to, and within the development. In order to create a foundation for the anticipated downtown revitalization, it is vital to have a pedestrian network that extends beyond the downtown in place. COMMERCIAL CORRIDORS  Auburn has several commercial corridors, most notably Auburn Way North and South, that are frequently traveled by pedestrians. While most of these areas have sidewalks, there is the opportunity to enhance the pedestrian environment. For instance, pedestrian crossing issues arise because pedestrians often cross at unsignalized locations rather than walking to the nearest signalized crossing. This dynamic is partially attributable to the location of bus stops in relation to employment centers. Hence, efforts should be made to locate bus stops so commuters crossing to the opposite side of the road are dropped off and picked up near a signalized intersection. Likewise, the City should encourage major employers to locate near transit routes and stops. Furthermore, pedestrian connections from residential areas to commercial corridors can be enhanced through site design policies that encourage more direct non-motorized connections to major retail locations. Future planning along commercial corridors should also include amenities such as landscaping adjacent to the sidewalk, improved pedestrian crossings, and enhanced bus stops at high use locations. RESIDENTIAL NEIGHBORHOODS  Investment in Auburn’s neighborhoods is an essential component of providing a comprehensive and functional pedestrian network. As noted in the needs assessment, sidewalk conditions vary throughout the City. This plan acknowledges the need to retrofit the pedestrian network in many areas of the City and incorporate pedestrian facilities into new development. Financial mechanisms to help accomplish this goal are described later in this chapter. LEA HILL AND WEST HILL AREAS  The Lea Hill and West Hill areas were annexed into the City of Auburn in 2008. Because these areas were developed largely under a county rural standard, many of the streets are lacking pedestrian facilities, resulting in a disconnected pedestrian system that has both safety and quality of life repercussions. A sidewalk inventory was conducted in Lea Hill and West Hill in 2008 to identify gaps in the sidewalk network and help the City prioritize areas for targeted Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-7 investment. Refer to Figure 3-1 to view existing sidewalks. HIGH PRIORITY PEDESTRIAN CORRIDORS  Figure 3-2 identifies High Priority Pedestrian Corridors that are currently lacking a complete sidewalk system. Some of the corridors have sidewalks on one side or for portions of the corridor. Others are missing sidewalks altogether. These High Priority Pedestrian Corridors were selected based on the following criteria: pedestrian volumes; proximity to schools, parks, transit routes and commercial areas; and where missing gaps can be completed. The High Priority Pedestrian Corridors are roadway corridors where the City intends to target investment in pedestrian facilities. The City’s current half street policy requires sidewalk to be installed by developers whenever significant improvements are made to a property. This has proven to be an effective means of building out the sidewalk network. However, it is a slow process because it relies on new development or redevelopment to occur, making it difficult to complete whole corridors. By programming specific pedestrian corridors for investment, the City can leverage grant dollars and other resources to more strategically complete gaps in key pedestrian corridors. The High Priority Pedestrian Corridors identified in Figure 3-2 should be reviewed regularly for inclusion in the City’s Six-Year Transportation Improvement Program and for grant funding opportunities. AUBURN PARKS, RECREATION & OPEN SPACE  PLAN 2005  The Auburn Parks, Recreation & Open Space Plan identifies specific projects for the development of local and regional trails. The Auburn-Pacific trail will provide a multi-use path that improves access from the White River to downtown. A planned pedestrian crossing, under the BNSF railroad tracks just north of the White River Bridge, will improve the regional trail system by providing a connection to the City of Pacific. Funding is still needed for the White River Trail connection to A Street SE and the north Auburn section of the Green River Trail. Private development may help fund a portion of the two-mile segment of the Green River Trail. Planning efforts are also focused on the Mill Creek Corridor/Auburn Environmental Park and southeast trails. This park project will introduce residents to the ecosystem along the creek. More detail on all of these efforts can be found in the Trails chapter of the Parks, Recreation and Open Space Plan. An important component of Auburn’s trail system includes trailheads. Trailheads should be inviting to users and provide amenities such as parking, bicycle racks, information Auburn Multi-Use Trail Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-8 kiosks, restroom facilities, water fountains, trash receptacles, and seating facilities. Trailheads should be constructed and improved as Auburn’s trail system further develops. See Figure 3-4 for existing and proposed trails and trailhead locations. FUNDING MECHANISMS  Sidewalk Improvement Program The City of Auburn developed the Sidewalk Improvement Program in 2004 to repair existing sidewalks and complete missing links in the sidewalk network. These funds are essential for promoting non-motorized travel and can be used to leverage other funding sources, such as state and federal grants. Auburn has identified three principal areas in which sidewalk improvements should be prioritized: corridors that provide access to and within the downtown, school zones, and parks. Additional criteria for priority access improvement could include, but are not limited to, areas with high concentrations of senior citizens or disabled citizens, areas with high volumes of pedestrian-transit interaction, and areas where property owners are willing to financially participate in the construction of sidewalk improvements through a local improvement district (LID). The selection of future sidewalk improvements relies on a hierarchy of existing conditions. The call-out box lists some key conditions that will be considered when prioritizing projects. “Save Our Streets” Program In November 2004, Auburn residents approved Proposition 1, “Save Our Street” Program, which creates a dedicated local street fund. This money will be set aside for repair and maintenance of local roadways. In addition, priority will be given to improving street crossings that are identified as safe walking routes to schools or are near essential public facilities. Projects under this program may also include enhanced pedestrian and bicycle facilities on or near roadways under repair. “Arterial Streets” Program With the success of the “Save Our Streets” Program for residential streets, the City is reviewing the potential of implementing a similar program for arterial streets. Pedestrian amenities and safety improvements would be included in many of the arterial improvement projects funded by such a program. Local Improvement Districts Local Improvement Districts (LID) enable city investment in a specified area by leveraging city funds with contributions from property owners in the district. LID’s use limited city resources to improve neighborhood quality and can be used to finance new sidewalks. Sidewalks will be prioritized:  Where hazardous conditions are present;  On school walk routes;  Where extensive improvements are needed in a single neighborhood;  Along streets with curb and gutter;  Along Downtown pedestrian corridors;  Where curb ramps are missing; and  Where they will complete a missing link in a pedestrian network.  Where property owners are willing to financially participate in the construction of sidewalk improvements through an LID. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-9 SAFETY EDUCATION AND ENFORCEMENT  Awareness of pedestrian safety issues should be promoted through educational programs and enforcement efforts. This combination helps reinforce key safety issues such as safe pedestrian crossings and speeding. The City will proactively work to identify problem areas and issues. The following list contains examples of some techniques that can be employed in these efforts.  Establishing non-motorized travel information kiosks at key City destinations (e.g. Main Street, Supermall, Emerald Downs, trails).  Displaying educational information in City publications, on the website, and on TV.  Developing wayfinding signage to direct pedestrians and bicyclists.  Partnering with the School District to teach children safe walking and biking behaviors.  Launching public information campaigns for problematic locations and partnering with the Police Department to provide enforcement.  Increasing driver awareness of vehicle speeds through the presence of radar speed signs and photo enforcement in school zones.  Enforcing pedestrian, bicyclist, and driver infractions, and posting signage to reinforce this priority. 3.2 Bicycle Travel Bicycle facilities are an important component of Auburn’s transportation and recreational infrastructure. Bicycling provides a clean, non-motorized form of transportation and allows citizens to maintain a healthy lifestyle. It also helps improve traffic congestion and air quality by providing an alternative to driving. Increasingly, bicycle commuting is becoming a more popular alternative, and the City must take steps to provide a more functional and attractive network for commute cyclists, in addition to recreational cyclists. NEEDS ASSESSMENT EXISTING CONDITIONS  The topography in many parts of Auburn is flat and conducive to cycling for a range of skill levels. Areas along the Green and White Rivers provide recreational opportunities for multi-use trails that support bicyclists, pedestrians and equestrians. The Interurban Trail is part of a major north-south regional trail system. The Green River trail is also an extension of a north-south regional trail. Therefore, Auburn has a good network of existing or planned north-south recreational trails. However, there are few existing cross- town connections and new connections onto the West Hill and Lea Hill are needed. Recreational and commuter cyclists travel along the Interurban Trail to areas north and south of Auburn. Cyclists also frequently ride along S 277th to the east side of Green River Road, and down along the Green River to 8th Street NE, or down R Street NE to SE Auburn Black Diamond Road. SE Auburn Black Diamond Road and SE Green Valley Road are popular routes for accessing areas east of Auburn. However, these roads are characterized by dangerous cycling conditions and are not suitable for inexperienced cyclists. Also, once in Auburn, there is no clear direction for traveling within and through the City. Bicycle lanes are extremely limited on city arterials and collectors, making it difficult both for regional and local riders to navigate for any reasonable distance through the City. Limited bicycle storage is also a hindrance to cyclists. Figure 3-3 identifies existing trails and bike lanes in the City. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-10 AUBURN BICYCLE TASK FORCE   In March 2010, Mayor Peter Lewis formed the City of Auburn Bicycle Task Force. Mayor Lewis intended that the Bicycle Task Force would further develop and refine develop the City’s goals and policies for its bicycle transportation system, The Task Force was comprised of a broad cross section of community members and interested parties that were charged to develop recommendations on bicycle facilities, issues and opportunities centered on the following three principles: Connections – As an example how do bicycle riders get from the north end to the south end of the City or from Lakeland to Lea Hill? Recreation Opportunities – As an example, how does the City further build and capitalize on a bicycle network to support and enhance the recreation options for its citizens? Economic Development – As an example, how does the City capitalize on the Interurban Trail as a conduit of customers for existing and new businesses? The Bicycle Task Force was comprised of twelve individuals plus representatives from Auburn School District, Green River Community College and Cascade Bicycle Club that were invited to be part of Task Force. The Task Force met a total of 14 times between April 2010 and November 2010 including a three hour community tour on Saturday, July 24, 2010 and a joint meeting with Auburn Tourism Board and Auburn Downtown Association on August 12, 2010. The Committee worked on a variety of issues including mapping of bicycle facilities and identification of bicycle related projects and priorities. On November 29, 2010, the Task Force’s recommendations were presented at an Auburn City Council Committee of the Whole meeting. The Task Force presented both short-term and long-term recommendations consisting of: Short-Term Recommendations: 1. Use Sharrows1/Share The Road signage in residential and some non-residential areas of City. 2. Implement a pilot program concept for Sharrows/Share the Road consisting of: a. 18-24 month program period b. Pre-established performance measurements c. Pre-established reporting protocols d. Future policy consideration opportunity for City Council 3. Continue installation of bike lanes in parts of City where there is existing/adequate right-of-way. 4. Develop Auburn specific bicycle signage program to highlight corridors, connectors and in-city/out of city destinations. 1Sharrows also known as shared lane markings, are on-street legends that reinforce the existing rules of the road. They are not separate bike lanes: a motorist can still drive over the sharrows. Motorists should expect to see and share the lane with bicyclists. Sharrows indicate to bicyclists the best place to ride in the lane. Sharrows are typically used in locations where the roadway width is not adequate to provide dedicated bike facilities or on downhill lanes where bicyclists might travel a similar speed as motor vehicles. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-11 5. Make improvements to existing Interurban Trail – signage, pavement conditions, vegetation maintenance, grade crossings, and upgrades to user facilities at Main Street crossing. Long-Term Recommendations: 1. Develop capital improvement program project with cost estimate for design and construction of bicycle/pedestrian bridge at southern terminus of M St. west of existing Stuck River Vehicle Bridge. 2. Develop capital improvement program project with cost estimate for design and construction of innovative and safe pedestrian/bicycle crossing at M St./Auburn Way South intersection. 3. Install one or more bike boxes2 through “pilot program” approach to test effectiveness and public response – possible locations West Main Street/C Street intersection, M Street/Auburn Way South intersection, Ellingson Rd/A Street intersection. 4. Install bicycle/pedestrian crossing warning systems along Interurban Trail at all crossing locations – 277th, 37th St. NW, West Main St. and 15th St. SW. 5. Develop an official Auburn Bike Map. In addition, the Bicycle Task Force presented the City Council with bicycle oriented economic development recommendations including:  Develop the Auburn Sounder Station as “starting point” for bike club rides. 2 Bike Boxes are a traffic control device at signalized intersections that require motorists to stop a short distance before the crosswalk and allow bicyclists to stop in the area between the cars and the crosswalk. Bicycle boxes give bicyclists priority by allowing them to go to the head of the line.  Rally the Auburn Downtown Association and Auburn Tourism Board to develop business support for bicycle riders/create bike-friendly businesses.  Create the perception of Auburn as “Bicycle City of South King County”.  Use social media to advertise Auburn as bicycle friendly community.  Connect with different types of bicycle organizations about bicycling opportunities in Auburn,  Establish an annual bike event in Auburn similar to Redmond Criterium and Enumclaw Days that offer bike awareness and other events such as time trials, road races and multiple terrain racing.  Develop an annual road race on Auburn streets – work with promoters to have different levels of road racing to appeal to multiple types of riders.  Establish tie ins with bicycle racing events at Pacific Raceway like weekly criterium races, mountain biking and Cyclocross. Following the presentation of its recommendations to the Auburn City Council, the Auburn Bicycle Task Force has continued to meet and work with City staff and the City of Auburn Transportation, Trails and Transit Committee to further refine and develop its recommendations. BICYCLE FACILITY CLASSIFICATION  The American Association of State Highway Transportation Officials (AASHTO) has developed classifications for bicycle facilities and parking. Bicycle classification is based on the design and exclusiveness of use. Class I multi-use trails that allow bicycles include the Interurban, White River, and Green River Trails. Some Class II bicycle lanes are located at: Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-12 Table 3-1 Existing Bicycle Facilities Facility Potential Primary Users Mileage within City Limits Hard-surface Trail Bicyclists Pedestrians 28.5 miles Soft-surface Trail Equestrians Off-road Cyclists Pedestrians 2.17 miles On-street Bike Lane Bicyclists 7 miles  S 277th Street, between the West Valley Hwy and B Street NW;  22nd Street NE between I and M Streets NE;  12th and 17th Street SE between A Street SE and Auburn Way;  S 21st Street SE between A Street SE and R Street SE;  29th Street SE/Riverwalk Drive SE between A St. SE and 28th St. SE; and  Terrace Drive. Bike parking facilities are classified by length of use: long term, medium term, and short term. The longer bikes are to be stored, the more durable the facility’s design must be. Bike storage facilities are located at only a few locations throughout the City. These include the transit center, which provides 12 bike rack spaces and eight spots in the lockers. Table 3-1 lists existing bicycle facilities; Figure 3-3 identifies facility locations.     IMPROVEMENT NEEDS  Cyclists desire safe routes that make connections throughout the City and to regional points of interests. The existing facilities fall short of creating a bicycle network in Auburn. They are isolated from one another. If unfamiliar with the terrain and/or unskilled, cyclists may find it difficult to bike through Auburn. Bicycle Facility Classification  Separate Facility (Class I) – A non- motorized facility, paved or unpaved, that is physically separated from motorized vehicular traffic by an open space or barrier. It is sometimes referred to as a Bicycle Path, Bike Trail, Non- motorized Trail, Multi-purpose Trail or some combination thereof.  Bike Lane (Class II) – A portion of a roadway that is designated by striping, signing, and pavement markings for preferential or exclusive use of bicyclists. Typically these lanes are located outside of the vehicle travel lane.  Bike Route (Class III) – A segment of road designated by the jurisdiction with appropriate directional and informational markers, but without striping, signing and pavement markings for the preferential or exclusive use of bicyclists.  Bike Friendly (Class IV) – A roadway not designated by directional and informational markers, striping, signing, or pavement markings for the preferential or exclusive use of bicyclists, but containing appropriate bicycle- friendly design standards such as wide curb lanes and bicycle safe drain grates. Source: Engineering Design Standards Manual, City of Auburn Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-13 The City plans to build out the bicycle network and provide better east-west connections. Upgrading bicycle facilities on city streets is an important component of this plan. Auburn shall make greater efforts in the future to encourage bicycle use, particularly for commuting purposes, as a form of transportation demand management (TDM). One mechanism of doing so is to encourage major employers to locate near trails and bicycle routes, and to provide facilities conducive to bicycling to work. Also, the City needs to take a more aggressive role in programming implementation of the future bicycle network identified in this chapter, ensuring that eventually all residents of and employees in Auburn feel comfortable commuting on bike. In addition, Auburn should seek outlets, including the City’s website, to provide up-to-date information on bicycling options within the City and to regional destinations. The Commute Trip Reduction (CTR) program provides a formal mechanism for encouraging these practices and is required by state law for employers with 100 or more employees arriving at a single location during the AM peak. Auburn’s CTR program calls out bicycle storage facilities, lockers, changing areas, and showers as measures employers can take to meet CTR goals. In addition, Auburn can use the SEPA process to encourage development of these facilities at the time of new development or tenant improvements. The Downtown Plan also discusses the need for improving bicycle facilities in the area. On- street bicycle facilities will be sought in association with planned roadway improvements. In addition, the City should investigate providing bicycle storage and other amenities on city owned properties. The Auburn Bicycle Task Force working with staff representatives from the City Public Works Department identified and inventoried a series of bicycle facility improvements. These improvements and associated issues and opportunities are presented in Table 3-2, Priority Bicycle Facilities Inventory. FUTURE TRAVEL The future bicycle network includes corridors for regional, recreational, and cross-town connections. The regional corridors will provide connections to the Valley communities as well other areas of King and Pierce Counties. Local biking groups have identified the Interurban Trail and Green River Trail as important regional connections. Other planned regional connections will link Auburn to attractions around the Puget Sound Region including Mount Rainer, the Port of Tacoma, and the Cities of Seattle and Woodinville. The Green and White River corridors are multi-functional, providing recreational opportunities for regional and local bicycle trips. Therefore, the City has prioritized the completion of both these trail systems. Also, Auburn will seek to enhance portions of City trail systems whenever possible, by providing amenities for non-motorized travelers such as rest areas, as well as safety improvements The Work is Easier when Shared Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-14 including warning signage and grade separated trails. Additional cross-town connections that complete the bicycle network will consist of local trails and on- road facilities linking Auburn's neighborhoods. The bicycle routes identified for future development link to existing multi-use trails and bike lanes. The R Street corridor from Auburn Black Diamond Road to 12th Street SW will provide a north-south connection between the Terminal Park neighborhood and other future bicycle lanes linking to the downtown and North Auburn. A future connection between Auburn Black Diamond Road and Auburn Way S is also proposed. The future Bonneville Power Trail will be a separated, hard surfaced trail crossing the Lea Hill area and connecting to the Interurban Trail and West Hill via on-street bicycle facilities. Numerous other on-street bicycle facilities and trails are planned. They are all identified in Figure 3-4, found at the end of this chapter. The Auburn Bicycle Task Force identified a future bicycle system based on the concepts of corridors and connectors. The Bicycle Task Force defines corridors as north/south bicycle facilities and connectors as east/west bicycle facilities. These corridors and connectors are identified in Figure 3-5, found at the end of this chapter. The Bicycle Task Force’ corridors and connectors are intended to promote cross town and regional travel and connections as specified below: Corridors: West Valley Corridor – 29th Street NW to Peasley Canyon Rd S North – 15th Street NW, Terrace Drive NW, West Hill, Federal Way via Peasley Canyon or Mountain View Drive, Emerald Downs, Interurban Trail South - – 15th Street NW, Terrace Drive NW, West Hill, Federal Way via Peasley Canyon or Mountain View Drive, Interurban Trail F Street/Les Gove Corridor – East Main Street to Les Gove/12th Street SE North – downtown Auburn, Main Street connector South – Les Gove Community Campus, South End M Street corridor A/B Street Corridor – 37th Street NW to Main Street North – North end businesses/industrial parks, Interurban Trail, Kent South – Downtown Auburn, Auburn Regional Medical Center, City Services, Main Street connector R Street NE/I Street NE Corridor – Main Street to 37th Street NE North – Lea Hill, North Auburn communities, Brandon Park, Green River Community College, other connectors/corridors South – Downtown Auburn, south end Auburn, Lea Hill, North Auburn communities, Brandon Park, Green River Community College, other connectors/corridors C Street Trail – 15th Street SW Corridor – Ellingson Road to 15th Street SW at Interurban Trail North – Interurban Trail connection, YMCA, SuperMall, Algona, Pacific, Tacoma, Seattle, Kent South – A Street SE-Lakeland Hills Corridor, Lakeland Hills community, South Auburn South End M Street Corridor – E Main Street down M Street to 37th Street SE to Ellingson Rd SW Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-15 South – Les Gove Park, Game Farm Park, other connectors to South Auburn communities North – Game Farm Park, Les Gove Park, Downtown Auburn Kersey Way SE Corridor – M Street/33rd up Kersey Way to Randall Ave SE up to 9th Street South – Bonney Lake, Sumner, East Lake Tapps, Buckley, connecting with Stewart Road Connector North – Game Farm Park, South End M Street Corridor, Downtown Auburn, Les Gove Park A Street SE –Lakeland Hills Corridor - Ellingson Rd SW to Lake Tapps Parkway SE North – Roegner Park, Lakeland Hills community South – Roegner Park, Lakeland Hills community, Stewart/Lake Tapps Parkway Connector Green River Road Corridor – 8th Street NE to 104th Avenue NE out Green River Road to 277th North – Auburn Golf Course, Mary Olson Farm, Kent, Green River South - Auburn Golf Course, Mary Olson Farm, Green River, Issac Jacobs Park, Downtown Auburn, other connectors/corridors 124th SE Corridor – GRCC to North City Limits North – Kent South – Green River Community College Connectors: Stewart/Lake Tapps Connector - Stewart Road to Lake Tapps Parkway to 182nd East – Lakeland Hills, Lakeland Hills Town Center, Sumner, Bonney Lake, Kersey Way West – Lakeland Town Center, Pacific, Sumner, Algona, Edgewood, Tacoma Riverwalk/Auburn Way South/Enumclaw Connector - 29th/M Street up Riverwalk to Dogwood out Auburn Way South East – Muckleshoot Indian Reservation, Game Farm Park, White River Amphitheater, Academy, Enumclaw West – South end Auburn communities, M Street corridor, Muckleshoot Indian Reservation , Game Farm Park, downtown Auburn Main Street Connector – R Street to West Valley West – Downtown Auburn, Interurban Trail, Sounder Station, City Services, Auburn Environmental Park, Auburn Regional Medical Center, Federal Way, West Hill East - Downtown Auburn, Interurban Trail, Sounder Station, City Services, Auburn Environmental Park, Auburn Regional Medical Center, Lea Hill, Green River Community College, Black Diamond North 37th Street /West Hill Connector – I Street to 51st Street East – North Auburn businesses, Interurban Trail, West Hill, Emerald Downs, Kent, North Auburn communities, West – North Auburn businesses, Interurban Trail, West Hill, Federal Way Lea Hill Connector – R Street up Lea Hill to Hwy 18 East – Green River Community College, Lea Hill, Pacific Race Ways, Kent, Maple Valley, Covington West – Downtown Auburn North 37th Street /West Hill Connector – I Street to 51st Street Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-16 East – North Auburn businesses, Interurban Trail, West Hill, Emerald Downs, Kent, North Auburn communities West – North Auburn businesses, Interurban Trail, West Hill, Federal Way R Street SE/Auburn Black Diamond Road Connector – East Main to East City Limits East – Flaming Geiser State Park, Green Valley Road, Black Diamond West – Downtown Auburn The selection of bike facility projects will be based upon safety, route continuity and connectivity issues. In addition to new bicycle corridors, spot safety improvements are an important component of the City’s future bicycle network. Improvements are needed at 15th Street SW and the Interurban Trail and C Street SW and Ellingson. In addition, safe access to downtown Auburn and onto West Hill and Lea Hill are a priority for the City. Typical bicycle route improvements along a Class I facility include purchasing the right- of-way, designing the trail, and constructing the trail and trailhead. For a Class II pathway, improvements include striping lanes, installing warning and directional signage, and painting bike symbols on the pavement. As this plan is updated in the future, emphasis should continue to be placed on developing a safe and convenient bicycling environment for both recreational and commuter cyclists of all experience levels. 3.3 Equestrian Travel Auburn citizens have a long history of supporting the planning and development of equestrian facilities. The City intends to increase its network of soft-surface, multi-use trails in more rural locations with appropriate facilities suitable for equestrian use. NEEDS ASSESSMENT EXISTING CONDITIONS  Auburn’s equestrian trail system is quite limited. The Parks Department currently manages a two-mile, soft-surface trail, along the White River at Roegner and Game Farm Wilderness Parks. Otherwise, there are no formal equestrian trails in Auburn. Horse owners do have informal access to the soft-surface path adjacent to the Interurban trail, as well as large open spaces in the rural area just south of the White River and east of Kersey Way in southeast Auburn. To reach the open areas, many ride along the edge of roads such as 53rd and 56th Streets SE. These are narrow roads with gravel shoulders. Drainage swales run parallel to many portions of these roads, and while conditions vary, typically there is a narrow unpaved shoulder or grassed area alongside the road where horses can walk.   IMPROVEMENT NEEDS  The lack of equestrian trail miles in the City and connectivity to regional equestrian facilities are two areas that need improvement. As indicated by Table 3-3, there are currently two-miles of formal equestrian trails in the City. This is a barrier to most equestrians, particularly those bringing horses via trailer. In order to become a more equestrian friendly community, Auburn must undertake planning Table 3-3 Existing Equestrian Facilities Facility Potential Primary Users Within Auburn City Limits Within Auburn PAA Soft- surface Trail Equestrians Off-road Cyclists Pedestrians 2.17 miles 2 miles + Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-17 initiatives to expand the current network and link to regional trails. Auburn, as a regionally designated Urban Center, is becoming increasingly urbanized. As the City continues to urbanize, it will seek opportunities to include equestrian planning in its infrastructure improvements. Special consideration for equestrian facilities should be given to southeast Auburn and the Lea Hill potential annexation area as both have existing equestrian communities. Loop trail development is one strategy that can be employed to increase the length of equestrian trails in Auburn. Loop trails can be linked to existing linear facilities, thereby increasing network miles. Opportunities to expand the equestrian trail system should be considered in all future infrastructure planning and development. Features such as busy arterial streets, steep slopes and narrow bridges are barriers to equestrian travel. Hence, equestrian trail planning should go hand in hand with other planning activities the City is undertaking. When planning equestrian trails, other facilities such as trailer parking and directional signage must be accommodated. FUTURE SYSTEM The southeast Auburn area, south of the White (Stuck) River and east of Kersey Way, should be designated as an Equestrian District. Future development in this area should be consistent with that designation. Southeast Auburn is particularly suitable as an Equestrian District because it contains a City watershed, shorelines of statewide significance, and numerous critical areas. Equestrian trails may be situated near some of these features, whereas more intense development may be unsuitable. Equestrian trails may also be appropriate for parts of Lea Hill, and should be evaluated as the area annexes into the City. When locating equestrian trails along rural roads, it may be appropriate to maximize trail potential by constructing a wider shoulder able to accommodate equestrian travel on one side of the road. Members of the equestrian community in Auburn have emphasized the desire for a trail connection between Roegner Park and southeast Auburn. One potential alignment would be along a route roughly parallel to Kersey Way and 53rd Street SE. The Parks Plan identifies this future trail as the Williams Trail. Potential obstacles include critical area impacts and right-of-way acquisition. The topography along Kersey Way includes steep hillsides and large drainage swales. As trail planning progresses to a more detailed level, other alignments should be evaluated. The equestrian routes identified for future development are concentrated along the White River, the Green River, and in the properties in southeast Auburn that are owned by public and semi-public organizations. These routes are identified as soft-surface, multi-use trails that are suitable for riding and walking. Construction costs and the extent of clearing needed are much less for soft-surface trails than for paved trails. Some of the soft-surface trails are proposed to occur in conjunction with a paved trail. Summaries of trails that are appropriate for equestrian use are listed in Table 3-3. Design specifications for equestrian trails will be incorporated into the Auburn Engineering Design Standards manual. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-18 3.4 Future Non-motorized System Auburn’s future non-motorized system consists of an interconnected network of sidewalks, bike lanes, multi-use trails, and equestrian paths. The list of proposed projects in Table 3-3 is developed for planning purposes. Figure 3-4 identifies the location of the trail projects identified in Table 3-3 and maps the future trail and bicycle network. This network will provide regional, recreational and citywide connections for a variety of non-motorized modes. The completed portions of the Interurban and Green River Trails connect pedestrians, cyclists, and equestrians to areas north and south of Auburn, while the White River Trail provides for east-west travel. Additional bike lanes through town and completion of the paved trail network will guide cyclists safely to points of interests and through congested areas of the City. The establishment of an equestrian district and trails in the southeast portion of the City permits more opportunities for equestrian travel in scenic areas. Pedestrians will be able to travel more safely and comfortably with the completion of the sidewalk network, new crossings and street lighting, increased driver awareness, and better street design near schools and frequently traveled pedestrian locations. The addition of the BNSF undercrossing, just north of the White River and west of A Street SE, will provide safe passage for pedestrians. A new trail connection along C Street SW will provide pedestrians and cyclists with a safer connection to downtown and the Transit Center.   PROMOTING HEALTHY COMMUNITIES  The City of Auburn envisions a transportation system that will help promote healthy community principles by coordinating land use, the non-motorized transportation system, and transit in a manner that encourages walking and bicycling. The Puget Sound Regional Council has identified several elements, which contribute to the desirability of walking, bicycling, and transit use.3  Concentrating complementary uses such as restaurants, retail and grocery stores proximate to residences and employment.  Linking neighborhoods by connecting streets, sidewalks, and trails.  Designing for safe and welcoming pedestrian and bicycle facilities.  Enhancing transit opportunities and non- motorized connections to transit facilities.  Reducing and mitigating the effects of parking. 3 Vision 2040 Update Issue Paper on Health: What’s Health Got to Do with Growth Management, Economic Development and Transportation?, Puget Sound Regional Council, Dec. 2, 2004. White River Trail Multi-Use Path Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-19 These principles, many of which can be promoted by thoughtful transportation systems planning, encourage healthier communities by increasing physical activity and decreasing air pollution caused by vehicle emissions. Auburn has historically planned for a transportation system that incorporates many healthy community principles, such as transit facility planning and regional trail planning. In addition, the Downtown Plan calls for a mixed-use, high density, pedestrian oriented downtown. In the future, Auburn shall continue to promote these principles through long-range planning efforts, capital facility improvements, development review, and community activities involving active lifestyle elements. IMPLEMENTATION TOOLS  The City has developed policies and identified funding strategies that will help implement the future non-motorized network. They can be found in Chapters 5 and 6 of this plan. The planning direction outlined in this chapter shall be used as the foundation for implementing the non-motorized policies and securing funding. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-20 Table 3-4 Future Trail and Bicycle Facility Projects Trail Name Description Potential Users Skinner- Road/3rd Avenue This trail, located within the City of Pacific, will provide connections for users west of the BNSF railroad to the White River Trail, the Supermall and downtown Auburn via the C Street trail. Bicyclists Pedestrians Green River Trail This paved trail will be part of a regional recreational corridor. King County is the lead administrator of the project but will work in collaboration with the City for the portion of the trail in Auburn. The trail alignment will extend along the west bank of the Green River from S 277tth St., south to Brannan and Dykstra Parks. It will then cross at the Dykstra Park bridge over to the east bank before crossing back to the west bank at the Green River beach access. A parallel trail on the east side of the Green River will exist between S 277th St. and Dykstra Park, also providing a connection to Green River Road. Two bridges are proposed; one south of the new S 277th St. and one for the Green River beach access. The trail will end at Auburn Narrows. There may be some technical difficulties aligning the trail on the east side of the river from S. 277th Street to the 8th Street NE Bridge. Safety issues will have to be studied further and adequately addressed during implementation of the trail. Bicyclists Equestrians Pedestrians Mill Creek Path This looped recreational path spurs off the Interurban Trail and will go through the Auburn Environmental Park. Off-road Cyclists Pedestrians Equestrians, possibly White River Trail The White River Trail runs along the south side of the White River from Roegner Park to the eastern edge of Game Farm Park. Future extensions of the trail are planned from A Street SE to Roegner Park, across the White River via the future BNSF Railroad underpass, on the south side of the river within the City of Pacific, and from Game Farm Wilderness Park to southeast Auburn along the White River. Bicyclists Equestrians Off-road Cyclists Pedestrians Williams Trail These recreational trails are intended to use public or quasi-public lands, including utility corridors. A variety of loop trails may be possible within this large area. Bicyclists Equestrians Off-road Cyclists Pedestrians Bonneville Power Trail This east-west trail will extend from Lea Hill to potentially I Street, where it will connect to West Hill via the 37th Street NW street ROW. There are topographical and environmental challenges that will need to be addressed during the design phase. Bicyclists Pedestrians Equestrians Academy Trail The portion of Academy Drive from SR 164 to Green Valley Road is permanently closed to vehicle traffic. However, it has the potential to be re-opened as a multi-use recreational trail. Bicyclists Pedestrians Equestrians Lakeland Hills Trail This trail connects the growing Lakeland development with Mill Pond Drive and Oravetz Road. It is unique in Auburn because it passes directly through a residential neighborhood. A significant portion of the trail is already built; future connections will allow residents to travel from Oravetz Road to Lake Tapps Parkway and Sunset Park. Pedestrians *Refer to Figure 3-4 for the location of future trail projects. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-21 Table 3-2 Priority Bicycle Facilities Inventory Segment ID # Current Street Classification Location R-O-W Impacts Existing Bicycle Facilities Proposed Bicycle Facilities 1 Arterial A St NW 15th St NW & 3rd St NW None None Striped Bike Lane on one side of street 2 Non Residential Collector Green River Rd between N City Limits and 104th Ave SE and 104th Ave SE between Green River Rd and 8th St NW None None Sharrows - shoulder to right wheel well on both sides install "Share the Road" signage along street segment; Improve asphalt on shoulder on west side 3 Arterial Lea Hill Rd between 104th Ave SE and 132nd Way SE None None Maintain shoulder with bike signage- preference for uphill is to move in fog line and narrow lane to allow for striped pedestrian/bike lane 4 Arterial Peasley Canyon Road to W Valley Hwy WSDOT ROW impacts None Striped bike lanes on both sides of street - reduce speed limit to 35 MPH 5 Arterial M St SE between E Main St and 37th St SE Yes, significant ROW impacts None north of 29th St, Striped bike lanes between 29th & 37th. Striped Bike Lanes on both sides along entire route; Need to transition riders at 12th Street/M Street intersection to help prepare for safe crossing at 17th Street/Auburn Way South /M Street Intersection; 17th Street realignment project will close off bike access via 17th - investigate existing island at M Street/17th Street 6 Residential Collector S 296th St between 51st Ave S and W Valley Hwy None None Sharrows & "Share the Road" signage on uphill portion & Sharrows on shoulder inside of fog line from 65th to 51st 7 Arterial 15th St NW between M St NW and Interurban Trail WSDOT ROW impacts None Paved bike path on both sides 8 Arterial E Main St between M St and R St None None Sharrows and "Share the Road" signage 9 Arterial Auburn Way South between Dogwood St SE and 32nd St SE None None Directional signage only - direct onto Dogwood only; "Share the Road" signage Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-22 10 Residential Collector R St NE between 8th St NE and E Main St None None Striped bike Lanes on both sides - possible lane size reduction/no parking elimination; 2 bike lanes with parking on one side 11 Arterial I St NE to 14th St NE to Pike St NE between 37th St NE and 8th St NE None None Install bike symbol signs within bike lanes 12 Arterial Lakeland Hills Way between Oravetz Rd SE and Lake Tapps Pkwy SE None None Sharrows between curb and fog line and "Share the Road" signage spaced along travel route 13 Arterial 10th St NE to 9th St NE to 8th St NE between C St NW and Pike St NE None None Sharrows & "Share the Road" signage along entire route 14 Non Residential Collector 4th St NE between Auburn Ace NE and M St NE None None Use existing facilities & install "Share the Road" signage 15 Arterial Kersey Way SE between R St SE and Lake Tapps Pkwy SE None None Tapered road does not allow for safe bicyclist movements; need to connect asphalt sections = short term fix 16 Arterial 37th St NE between B St NW and I St NE None None Sharrows & "Share the Road" signage 17 Arterial 8th St NE between R St NE and 104th Ave SE Yes None Shared pedestrian/bike sidewalk along south side of 8th Street from R Street to bridge 18 Residential Collector 37th St SE between M St SE and R St SE None None Need crosswalk across R Street at 37th Street intersection 19 Arterial Lakeland Hills Way to Oravetz Road to Oravetz Place ( A St Loop) None None Share the road and directional signage 20 Arterial 8th St NE between Pike St NE and R St NE None None Crosswalk needed at 8th Street/R Street intersection to transfer to north side connection to R Street Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-23 21 Arterial R St NE to Auburn Block Diamond Rd between E Main St and E City Limit None None Install bike lanes on both sides outside of fog line between East Main and RR tracks - look at narrowing lanes; Install "Share the Road" signage between RR tracks and Auburn Black Diamond Road 22 Arterial Main St between A St NW and M St NE None None Sharrows and "Share the Road" signage 23 Arterial M St NE between 4th St NE and E Main St None None Striped bike lanes on both sides along entire route - 3 lane facility with bike lanes 24 Residential Collector D St SE between 37th St SE and 41st St SE None None Sharrows and "Share the Road" signage 25 Arterial 37th St NW between West Valley Hwy and B St NW None None Speed Concerns; Current Speed of 40 MPH too high; Ramps at Interurban Trail not at correct grade for sight visibility; Vegetation at 37th Street parking lot overgrown 26 Arterial 112th Ave SE to SE 81st St between SE 304th St and SE 274th St None None Sharrows and "Share the Road" signage 27 Non Residential Collector SE 304th St between 112th Ave SE and 124th Ave SE None None Sharrows and "Share the Road" signage 28 Arterial 124th Ave SE between SE 304th St and N City Limits None None Sharrows and "Share the Road" signage 29 Arterial 124th Ave SE between SE 304th St and SE 312th St None None Sharrows and "Share the Road" signage 30 Arterial 124th Ave SE between SE 312th St and SE 320th St None None Sharrows and "Share the Road" signage 31 Non Residential Collector SE 320th St between 124th Ave SE and 112th Ave SE None None Sharrows and "Share the Road" signage 32 Residential Collector 112th Ave SE between Lea Hill Rd SE and SE 320th St None None Sharrows and "Share the Road" signage 33 Arterial 132nd Ave SE between SE 288th St and SE 304th St None None Sharrows and "Share the Road" signage Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-24 34 Non Residential Collector SE 304th St between 124th Ave SE and 132nd Ave SE None None Sharrows and "Share the Road" signage 35 Arterial 15th St NW between M St NW and Terrace Dr NW None None Striped bike lanes on both sides 36 Arterial W Valley Hwy between W Main St and 15th St NW None None Striped bike lanes on both sides 37 Arterial 132nd Way/Ave SE between SE 312th St and SE 304th St None None Sharrows and "Share the Road" signage 38 Non Residential Collector S 331st St between 321st St S and W Valley Hwy None None Sharrows and "Share the Road" signage 39 Arterial Lake Tapps Pkwy to Sumner Tapps Hwy between 182nd Ave E and S City Limits None None Striped pedestrian bike lanes on both sides 40 Arterial 41st St SE between C St SW and D St SE None None Sharrows and "Share the Road" signage 41 Residential Collector Howard Rd SE between Riverwalk Dr SE and??? None None Sharrows and "Share the Road" signage 42 Arterial 29th St SE between M St SE and Riverwalk Dr SE None None Install bike symbols in existing bike lanes 43 Local Street Dogwood St SE to Forest Ridge Dr SE to 28th St SE between Auburn Way South and Riverwalk Dr SE None None Sharrows and directional signage 44 Interurban Trail North/south through City None None Interurban Trail south of West Main Street needs to be repaired; Need to explore speed reductions near all Interurban Trail Crossings; vegetation maintenance needed on Interurban Trail on both sides of 37th St NE; 45 Principal Arterial Trail Connection None None Directional signage only 46 Residential Collector M St SE over White River Yes None New shared use bridge over the river connecting M St SE to Whiter River Trail. Comprehensive Transportation Plan Chapter 3. Non-Motorized Transportation Page 3-25 47 Residential Collector 62nd Street between Lakeland Hills Way & Lake Tapps Parkway None None Striped bike lanes on both sides along entire route 48 Arterial A Street SE between Ellingson & Trail Connection Yes None Signage only 49 Arterial M Street over White River Yes Non Bicycle/pedestrian bridge over White River to connect to White River Trail 50 Arterial B Street between 37th St NW & 30th St NW None None Sharrows & signage 51 Arterial B Street between 30th St NW & 15th St NW None None Sharrows & signage 52 Arterial B Street between 3rd St NW & West Main Street None None Sharrows & directional signage 53 Arterial Peasley Canyon Road from 321st to W. Valley Highway None None Bike path on outer edge of Peasley Canyon Park-n-Ride for uphill climb; 54 Arterial W. Main Street between Interurban Trail & A St SW None Yes Interurban Trail west to W Valley Hwy = 3 vehicle lanes and striped bike lanes on both sides 55 Arterial W. Main Street between Interurban Trail & W. Valley Highway None None W Valley Hwy. to Interurban Trail = 3 vehicle lanes and striped bike lanes on both sides 56 Arterial Dogwood Loop None None Sharrows and signage 57 Residential Collector 62nd Street between Lake Tapps Parkway & 16th Street None None Sharrows and signage Sources: City of Auburn, King County nm nm nm nm nm nm nmnm nmnm nmnm nm nm nmnm nm nm nmnm nm nm nm nm nm nm nm nm nm nm nm nm nm 3 7 t h W a y 132nd Ave 37th S t 304th St 316th St 316th St 56th Ave 56 th A v e 284th Pl 37th St 12 4th Avct 296th St 304th W a y 56 th Pl 288th St 284th St 3 7 t h S t 11 2 t h Pl 28 4 t h S t 37th Pl 132nd Ave 296th Pl 112th Ave 296th St 288th St 304th St 112th Ave 124th Ave Auburn Ave Auburn Way 321st St P e a s l e y C a n y o n R d M ilita ry Rd 1st Ave 17th St Main St 312th S t Jovita B lvd 8 th St Stewart Rd Tapps Hwy Ellingson Rd Milwaukee Blvd Pacific Ave 3rd Ave 8th St 12th St 9th St 182nd Ave 51 s t A v e 272 n d S t 320th St V a l l e y H w y D ieringer Hwy Valley Hwy 15th St 277th St V a l l ey Hwy Gree n River R d 15 th S t Ha r v e y R d 3 31st S t 2 1 0 t h A v e 24th St 34 2nd St 8th St Lake Holm Rd R St 94th P l 214th Ave 1 6 t h S t 307th Pl 122nd Ave 4 6 t h P l 1 0 5 t h P l Kersey W ay M St L e a H i l l Rd 104th Ave 5 5 t h Ave A St A St C S t UV164 UV167 UV18 UV516 UV167 Existing Sidewalks nm Schools Parks 1/4 Mile from School 1/2 Mile from School City Limits00.5 Miles ° Auburn Transportation Plan Existing Sidewalks Figure 3-1 Sources: City of Auburn, King County nm nm nm nm nm nm nmnm nmnm nmnm nm nm nmnm nm nm nmnm nm nm nm nm nm nm nm nm nm nm nm nm nm 3 7 t h W a y 132nd Ave 37th S t 304th St 316th St 316th St 56th Ave 56 th A v e 284th Pl 37th St 12 4th Avct 296th St 304th W a y 56 th Pl 288th St 284th St 3 7 t h S t 11 2 t h Pl 28 4 t h S t 37th Pl 132nd Ave 296th Pl 112th Ave 296th St 288th St 304th St 112th Ave 124th Ave Auburn Ave Auburn Way 321st St P e a s l e y C a n y o n R d M ilita ry Rd 1st Ave 17th St Main St 312th S t Jovita B lvd 8 th St Stewart Rd Tapps Hwy Ellingson Rd Milwaukee Blvd Pacific Ave 3rd Ave 8th St 12th St 9th St 182nd Ave 51 s t A v e 272 n d S t 320th St V a l l e y H w y D ieringer Hwy Valley Hwy 15th St 277th St V a l l ey Hwy Gree n River R d 15 th S t Ha r v e y R d 3 31st S t 2 1 0 t h A v e 24th St 34 2nd St 8th St Lake Holm Rd R St 94th P l 214th Ave 1 6 t h S t 307th Pl 122nd Ave 4 6 t h P l 1 0 5 t h P l Kersey W ay M St L e a H i l l Rd 104th Ave 5 5 t h Ave A St A St C S t UV164 UV167 UV18 UV516 UV167 Priority* Pedestrian Corridor Existing Sidewalks nm Schools Parks 1/4 Mile from School 1/2 Mile from School City Limits 0 0.5 Miles ° Auburn Transportation Plan Future Priority Sidewalk Corridors Figure 3-2*Priority for Funding Sources: City of Auburn, King County In t e r u r b a n Whi t e R i v e r T r a i l UV516 UV164 UV18 UV167 2 n d S t O St 22nd St 3rd St 6th St 29th St 1st Ave 1 s t S t A St Academy D r Hemlock St 116th Ave 3 2 n d S t 11 6 t h A v e Pacific Ave 3 2 1 s t S t Harvey R d D St 118th Ave 316th St Howar d R d 2 7 2 n d S t 3 0th St E St 280th St 292nd S t K erse y W ay 304th Wa y 6 2 n d S t 29 6th S t 17th St 320th St 284th St 12th St F St 3 7 t h S t 300th S t 12th St 1 0 5 t h Pl 16th St 9th St 4th St 56th Ave 21st St Terr a c e Dr 2 1 0th A v e 29th S t R S t 15th St Or a vetz Rd 1 5 t h St 8th St 37th S t El li n gso n R d 8 t h S t Lea Hill Rd P e a s le y C a n y o n Rd C St I St Mount Vi ew Dr 51st Ave Lakeland Hill s W a y S u m n er Ta p p s H w y 12 4 t h A v e Auburn Way Main St A St 2 77th St G ST SW Dogwood St 182nd Ave Ri v erv iew Dr Mill Pond Dr B ou n dar y Bl vd M St 104th Ave 7 2nd Ave C St55th Ave 285th St V a l l e y H w y 132nd Ave 304th St C St Emerald Downs D r E v e r g r e e n Way M St 112th Ave Green River R d B St Valley Hwy H St nm SchoolsParksCity Limits Bike Routes (Class 2 or 3)Multi-Use Trails (Class 1) 0 0.5 Miles ° Auburn Transportation Plan Existing Bicycle Facilitiesand Multi-Use Trails Figure 3-3 Sources: City of Auburn, King County !( !( !( !( !( !( !( !( !( !( !( In t e r u r b a n Whi t e R i v e r T r a i l UV516 UV164 UV18 UV167 2 n d St O St 22nd St 3rd St 6th St 29th St 1st Ave 1 s t S t A St Acade m y D r Hemlock St 116th Ave 14th St 3 2 n d St 11 6 t h A v e Pacific Ave 3 2 1 s t S t Harvey R d D St 118th Ave 316th St Howar d R d 2 7 2 n d S t 3 0th St E St 280th St 292nd S t K erse y W ay 304th Wa y 6 2 n d S t 296th St 17 th St 320th St 284th St 12th St F St 37th St 300th S t 12th St 1 0 5 t h Pl 16th St 9th St 4th St 56th Ave 21st St Terr a c e Dr 2 1 0th A v e 29th S t R St 15th St Or a vetz Rd 15th St 8th St 37th S t El li n gso n R d 8 t h S t Lea Hill Rd P e a s le y C a n y o n Rd C S t I St Mount Vi ew Dr 51st Ave S u m n e r Ta p p s H w y 12 4 t h A v e Auburn Way Main St A St 2 77th St G ST SW Dogwood St 182nd Ave R St Riv ervie w Dr Mill Pond Dr Bo u nd ary B lv d M St 104th Ave 7 2nd Ave C St55th Ave 285 th St V a l l e y H w y 132nd Ave 3 04th St C St Emerald Downs D r E v e r g r e e n Way M St 112th Ave Green River R d B St Valley Hwy H St nm Schools ParksCity Limits !(Existing Trailhead !(Future Trailhead Bike Routes (Class 2 or 3)Multi-Use Trails (Class 1)Future Bike Route (Class 2 or 3)Future Multi-Use Trail (Class 1)0 0.5 Miles ° Auburn Transportation Plan Future Bicycle Facilitiesand Multi-Use Trails Figure 3-4 UV18 UV164 A S t E St 3rd St 6 th St 1s t S t F S t 2 n d S t 8 t h S t 4 th S t M a i n S t G ST SW Auburn Way R St C S t M S t H St AUBURN GOLF COURSE WASHINGTON NATIONAL GOLF COURSE SUMNER MEADOWS GOLF LINKS TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE TAPPS ISLAND GOLF COURSE IN T E R U R B A N T R A I L MAIN ST CONNECTOR A/ B S T R E E T C O R R I D O R 12 4 T H A V E S E C O R R I D O R GR E E N R I V E R R O A D C O R R I D O R LEA HILL CONNECTOR STEWART/LAKE TAPPS CONNECTOR SO U T H A U B U R N M S T R E E T S E C O R R I D O R WE S T V A L L E Y C O R R I D O R A S T S E A N D L A K E L A N D H I L L S C O R R I D O R NORTH 37TH ST NW AND WEST HILL CONNECTOR NO R T H A U B U R N R S T R E E T N E / I S T R E E T N E C O R R I D O R RIV E R W A L K - A U B U R N W A Y S - E N U M C L A W C O N N E C T O R C S T R E E T T R A I L A N D 1 5 T H S T S W C O R R I D O R KE R S E Y W A Y / L A K E T A P P S C O R R I D O R KENT PIERCE COUNTY KING COUNTY SUMNER PACIFIC EDGEWOOD ALGONA FEDERAL WAY 18 18 516 164 167 167 AUBURNENVIRONMENTALPARK MUCKLESHOOTCASINO SUPERMALL A S T S E C S T S W B S T N W AUBURN W A Y S I S T N E M S T S E AU B U R N W A Y N 51 S T A V E S 12 4 T H A V E S E WE S T V A L L E Y H W Y N 13 2 N D A V E S E R S T S E C S T N W W MAIN ST E MAIN ST 11 2 T H A V E S E 41ST ST SE KERS E Y W A Y S E 29TH ST SE SE 312TH ST 8TH ST NE ORAV E T Z R D S E M S T N E D S T N W 4TH ST SE 15TH ST NW A S T N E LA K E T A P P S P K W Y S E WES T V A L L E Y H W Y S LEA HILL R D S E 37TH ST NE S 316TH ST S 277TH ST 321ST ST S PEASLEY CANYON RD S D S T N E EA S T V A L L E Y H W Y S E H A R V E Y R D N E 15TH ST SW BOUNDARY BLVD SW A S T N W AU B U R N A V E N E TE R R A C E D R N W SE 281ST ST SE 304TH ST 17TH ST SE 6TH ST SE 3RD ST SW 10TH ST NE 12 4 T H A V E S E A S T S E R S T S E S 277TH ST F S T R E E T / L E S G O V E C O R R I D O R AUB U R N B L A C K D I A M O N D / G R E E N V A L L E Y R O A D C O N N E C T O R Schools Connectors Corridors Interurban Trail Parks Auburn City Limits Figure 3-5: Bicycle Corridors and Connectors Printed On: 09/19/11Map ID: 3741 Information shown is for general reference purposes only and does not necessarily represent exact geographic or cartographic data as mapped. The City of Auburn makes no warranty as to its accuracy. 05001,0001,5002,0002,500 FEET Focus Areas Dow n h i l l B.P.A Powerline Right of Way B.P.A Po w e r l i n e R i g h t o f W a y B.P.A Pow e r l i n e R i g h t o f W a y VA L E N T I N E ToToFlaming Flaming GeyserGeyser EMERALDDOWNS AUBURNDOWNTOWN SUPERMALL YMCA LES GOVE H i l l AUBURNGOLFCOURSEBRANNAN PARK MARYOLSONPARK LAKELAND HILLSCOMMERCIALAREA Only ToToKentKent ToToKentKent ToToKentKentToToKentKent&&SeattleSeattle ToToFederal Federal WayWay ToToFederal Federal WayWay ToToFederal Federal WayWay ToToEdgewoodEdgewood ToToMiltonMilton To To TacomaTacoma ToToSumnerSumner&&PuyallupPuyallup ToToSumnerSumner&&BonneyBonneyLakeLake ToToBonneyBonneyLakeLake ToToEnumclawEnumclaw ToToBlackBlackDiamondDiamond ToToPacificPacificRacewaysRaceways GRCC GAMEFARMPARK MUCKLESHOOTCASINO PACIFICRACEWAYS IN T E R U R B A N T R A I L INT E R U R B A N T R A I L ToToKentKent Rec o m m e n d e d Uphill Route AUBURNENVIRONMENTALPARK Comprehensive Transportation Plan Chapter 4. Transit Page 4- 1 Auburn Transit Center CHAPTER 4. TRANSIT Transit service is a key component of Auburn’s transportation system, improving mobility within the City and providing connections to the employment and commercial centers of western Washington. Unlike the street and non-motorized systems, Auburn does not directly administer transit service. Rather, the City works with the following regional and county transit agencies to coordinate service in Auburn: Sound Transit, Metro Transit, and Pierce Transit. These agencies are publicly funded and are responsible for providing transit service within their jurisdictions. Today, Auburn is served by local and regional bus, as well as a commuter rail line that runs between Seattle and Tacoma. However, transit in the area has a long and interesting history. In the early part of the twentieth century, Puget Sound Traction, Light and Power linked Auburn to Seattle via a fast electric interurban line until progress on Highway 99 and the rise of automobile use ultimately doomed the system. Seattle-Tacoma interurban rail service ended on December 30, 1928. After World War II, policymakers and planners made several unsuccessful efforts to recreate a regional transit system to address suburban sprawl and growing traffic congestion. That changed in 1972, when voters approved the creation of Metro Transit, an all-bus system now operated by King County. In 1979, Pierce Transit was formed when voters passed a 0.3 percent sales tax to fund public transportation. In 1995, voters in King, Snohomish, and Pierce Counties rejected a $6.7 billion Regional Transit Authority (RTA) proposal for light rail, standard-gauge commuter rail, and express buses. However, a smaller “Sound Transit” plan, valued at $3.9 billion, won approval on November 5, 1996. On September 18, 2000, almost 72 years after interurban cars stopped running, the first Sound Transit ‘Sounder’ commuter trains rolled between Seattle, Auburn and Tacoma – reinstating an important regional rail link. Today Auburn is also served by an extensive local bus system operated by Metro Transit. It is also connected to Seattle, Bellevue, and Pierce County by Sound Transit Express bus service. 4.1 NEEDS ASSESSMENT EXISTING TRANSIT SERVICES The following section provides a brief summary of the public transportation services offered in Auburn. Existing transit service for the Auburn area is identified in Figure 4-1. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 2 Metro Transit Hybrid Articulated Bus Courtesy: Metro Transit METRO AND PIERCE TRANSIT BUS SERVICES Metro Transit provides local bus services linking destinations within the community and providing a regional connection at the downtown Auburn Transit Center and the Auburn 15th Street NW Park-and-Ride. Metro Transit offers the following services in Auburn. Route 152 runs weekday peak hour service between the Auburn Transit Center, the 15th Street NW Park-and-Ride, Star Lake Park-and-Ride (I-5/S 272nd Street) and downtown Seattle. Route 154 provides weekday service between the Auburn Transit Center, the Auburn 15th Street NW Park-and-Ride, the Kent Transit Center, Boeing in Kent, the Tukwila Park-and-Ride, Boeing Field and Development Center, and the Federal Center South in Seattle. Route 164 provides important local service between Kent and Green River Community College. Route 180 provides service daily between southeast Auburn, Auburn Station, and Kent Station/Transit Center, meeting the MT 150, with service to and from Seattle, at Kent Station. Until the early evening hours, Route 180 also serves Sea-Tac Airport and the Burien Transit Center. Route 181 provides weekday/weekend ser- vice between the Twin Lakes Park-and- Ride, Sea-Tac Mall, Federal Way Transit Center, the Supermall, Auburn Transit Cen- ter, and Green River Community College. Route 915 provides weekday peak hour service, scheduled to meet the Sounder Commuter Rail trains at Auburn Station, as well as weekday midday service between the Auburn Transit Center and Enumclaw via Auburn Way South and SR 164. Route 917, operated by DART, provides weekday and Saturday service between Lakeland Hills, A Street SE, 41st Street SE, Algona, the Supermall, the Social Security Administration, the General Services Administration (GSA), and the Auburn Transit Center. The route offers Dial-A- Ride (limited variable route) service in portions of Lakeland Hills and Algona. Community Shuttle – Routes 919 & 910 Route 919 is a DART route, which beginning in February 2010 will operate fixed route service every 60 minutes between I Street NE/40th Street and Les Gove Campus between approximately 8:00 a.m. and 4:00 p.m. on weekdays. Route 910 is also a DART route and beginning in February 2010, will function as a community shuttle circulator service with the Route 919. The 910 will be timed to meet the 919 at the Auburn Transit Station and provide service between downtown Auburn and the Supermall/YMCA on 15th Street SW. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 3 DART Vehicle Courtesy: City of Kent Route 497 is a route operated by Pierce Transit in partnership with the City of Auburn, Sound Transit, and Metro Transit. It operates peak hour service between Sunset Park in Lakeland Hills and the Auburn Transit Station. The 497 is a commuter oriented route, but is open to all. In the future, the City hopes to expand the 497 to all day service to provide more comprehensive transit service to the Lakeland Hills area. ACCESS ACCESS Transportation is a paratransit service, providing door-to-door, shared-ride van transportation within most of King County. The Americans with Disabilities Act (ADA) requires curb-to-curb paratransit service as a safety net for persons whose disabilities prevent use of accessible non-commuter, fixed route bus service. Complementary paratransit service is intended to offer a comparable level of service to that provided by regular bus service. Paratransit service is not required nor intended to meet all the transportation needs of persons with disabilities, but rather, to provide public transportation in a more specialized form. VANPOOL SERVICES Metro Transit and Pierce Transit sponsor vanpool services that serve residents and employees in Auburn. Vanpool is a shared- ride service that provides group transport for commuters with proximate origins and destinations. Vanpool is a popular and flexible service that provides commuters with an alternative to driving alone and fixed-route transit service. Currently, Pierce County sponsors eight vanpools either beginning or ending in Auburn; Metro Transit sponsors several as well. Vanpool will undoubtedly continue to be an important strategy for mitigating peak hour congestion throughout Auburn and the region. TRANSIT FACILITIES Metro Transit owns and operates several transit facilities, including the Auburn 15th Street NW Park-and-Ride with approxi- mately 358 surface parking stalls. Metro also operates into the Auburn Transit Center in downtown Auburn. Additionally, the system maintains approximately 180 other bus stops in the community, 17 of which contain passenger shelters. COMMUTE TRIP REDUCTION (CTR) Under state law, the City is required to administer a Commute Trip Reduction program for all employers in Auburn with at least 100 employees arriving during the peak morning commute hours. The City of Auburn contracts with Metro Transit to provide CTR support services for the CTR affected local employers. Currently, there are 11 CTR employers in Auburn with a total of 5,500 employees. The agency assists employers in complying with state law by providing rideshare support and a host of other incentives aimed at reducing single occupant vehicle travel. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 4 Sounder Train Courtesy: Sound Transit Sound Transit Regional Express Bus Courtesy: Sound Transit SOUND TRANSIT Sound Transit provides limited stop, regional transit services linking Auburn to major regional destinations in King and Pierce Counties. The agency offers two types of service, Sounder commuter rail and regional express bus. SOUNDER COMMUTER RAIL Sound Transit operates the Sounder commuter rail service on the Tacoma – Seattle routing via the BNSF Railway. Sound Transit provides weekday peak hour trips northbound to Seattle in the AM and southbound from Seattle to Tacoma in the PM. Additional special event service to and from Seattle and the Emerald Downs racetrack in Auburn is offered on weekends. Currently, seven trains operate northbound to Seattle in the morning peak and return southbound during the PM peak. Two trains operate southbound to Tacoma in the morning and northbound in the early evening. REGIONAL EXPRESS BUS SERVICE Route 564/565 offers daily weekday, limited stop service between the Federal Way Transit Center (565 only), the South Hill Transit Center (564 only), the South Hill Park & Ride (564 only), the Sumner Station (564 only), the Auburn Transit Center, the Kent Transit Center, the Renton Transit Center, the Bellevue Transit Center, and the Overlake Transit Center. TRANSIT FACILITIES Sound Transit owns and operates the Auburn Transit Center located at 1st Street SW and A Street SW. This full service multi-modal facility provides parking for 365 vehicles in a 6-story parking garage and 113 stalls in a surface parking lot. The facility currently handles approximately 450 daily bus trips (117 Sound Transit trips; 333 Metro Transit trips). Daily, 1,200 passengers board buses at the facility, and 900 passengers disembark. Daily commuter train boardings currently average about 400 passengers. 4.2 Transit User Needs DEMOGRAPHICS People use public transportation for two reasons: because they have to ride or because they choose to ride. Carrying the choice rider, such as commuters, often has the greatest positive impact on the Comprehensive Transportation Plan Chapter 4. Transit Page 4- 5 transportation system by helping control peak hour traffic demand. But providing a “safety net” of adequate transportation to those who absolutely depend on it is, arguably, public transportation’s most important role. There are a number of ways to identify “transit dependency” but the most effective way is to identify locations with high concentrations of residents who have no vehicle available in their household. An examination of the most recent year 2000 Census data available from the Bureau of the Census shows that some areas of Auburn have a surprisingly high number of households with no vehicle available. As a comparison baseline, 9 percent of Auburn households have no vehicle available; this percentage is consistent with that of King County (9 percent) and slightly higher than that of Pierce County (8 percent). For the purpose of this analysis, block groups with significant concentrations of residential development in which over 12 percent of households have no vehicle available are considered transit dependent areas. There are eleven census block groups in Auburn in which over 12 percent of households have no vehicle available, nine of which have significant concentrations of residential development and are therefore identified as transit dependent areas. It is also notable that four of the nine block groups with large concentrations of residential development have at least 20 percent of households with no vehicle available. The nine block groups comprising the transit dependent areas had a total of 3,698 households in 2000, 771 (21 percent) of which had no vehicle available. Figure 4- 2 shows the transit dependent areas and overlays the existing transit service in order to identify if adequate transit service is available to these highly transit dependent neighborhoods. Comparing the neighborhoods in question to the transit route structure, it is apparent that the vast majority of Auburn’s most transit dependent population lives within ¼ miles of a fixed route bus – the distance standard most often identified by the transit industry as a reasonable walking distance to transit. An exception to that rule is the area near Dogwood Street SE north of Auburn Way South where many of the transit dependent residents are located more than ¼ mile from fixed route bus service. In the future, it will be critical to ensure these areas continue to be well covered by transit service, both in terms of route and schedule coverage. SERVICE COVERAGE Generally speaking, local transit service coverage in Auburn is well planned and well operated. Nonetheless, there are some areas of the community that do not have adequate local service coverage, as well as some highly important regional bus links and commuter rail services that have yet to be completed. LOCAL BUS SERVICE Several of Auburn’s most populated neighborhoods are deficient in local bus service, including West Hill, Lakeland Hills during the non-peak hours, and parts of east and north Auburn. This is problematic, for choice riders because it indicates a missed opportunity to alleviate demand on the street system and for transit dependent riders because those populations have inadequate transportation options. The least served residential area of Auburn is West Hill, an area with approximately 5,000 residents and no transit service. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 6 Lakeland Hills, a planned residential community with approximately 3,800 homes has peak hour service to downtown Auburn but is lacking in all day service. Lea Hill, a predominantly residential community on Auburn’s east hill does have two transit routes, but still, a large percentage of the neighborhood is not within walking distance of a transit route. In 2009, a license plate survey of the Auburn Transit Station garage indicated a substantial number of Lea Hill residents utilize the transit services at Auburn Station. This suggests that a commuter oriented shuttle serving Lea Hill, similar to the shuttle implemented in Lakeland Hills, would be very successful. Additionally, residential areas of east Auburn, east of M Street NE and south of 8th Street NE, and parts of northeast Auburn, east of I Street NE, are also located more than ¼ mile from fixed route bus service. Hence, it is inordinately difficult for residents of these areas to use transit, both for local trips and for connecting to regional routes via the Auburn Transit Center. The design of King County Metro’s local bus routes in Auburn should be reviewed in relation to future changes in Sound Transit’s Sounder commuter rail and regional express bus services to identify opportunities and priorities for productive improvements to transit coverage, frequency, and hours of operation. Figure 4-3 highlights areas of the Auburn community with minimal transit service. REGIONAL BUS SERVICE The most important unmet regional transit need is for all day, express bus service to and from Tacoma and Seattle. While the original Sound Transit Regional Express Bus Service Plan contained a direct link between Auburn and Tacoma, the connection was dropped from Sound Transit’s later service plans. Likewise, despite limited peak hour commuter rail being available to and from Seattle, a midday commuter rail connection is, according to Sound Transit, only likely in the distant future. Instituting a reliable, all- day bus connection to and from Seattle will also encourage increased commuter rail ridership by providing a midday transit option as a safety net for those with daytime business in Tacoma or Seattle. Instituting express bus service to and from Seattle and Tacoma will also provide an unmet regional transit opportunity for people who work in Auburn and who live north of Auburn. The availability of all-day regional bus service to and from Tacoma and Seattle on regular headways will also help meet the shift time requirements of major Auburn employers whose shift times are currently not compatible with Sounder commuter rail arrival times. In summary, the future availability of all-day, direct express bus connections between Tacoma and Seattle, Washington’s two largest cities, with stops at the stations served by Sounder commuter rail, should be a top priority. SOUNDER COMMUTER RAIL Sounder Commuter Rail, a highly popular and attractive service, operates bi- directionally in the peak periods, although a.m. southbound service is minimal. The current orientation of morning commuter rail service predominantly northbound to Seattle provides limited opportunity for most of the employees of South King County businesses to access their work sites via commuter rail. INTERCITY PASSENGER RAIL Auburn is an ideal location for a future stop on the Pacific Northwest Rail Corridor, which runs from Vancouver, BC to Comprehensive Transportation Plan Chapter 4. Transit Page 4- 7 Auburn YMCA - Major trip generator Eugene, OR. WSDOT is currently evaluating and seeking funding for the proposed expansion of existing intercity rail service, which would provide an alternative to air travel and interstate highway travel. When that occurs, Auburn would be an ideal location for an interim stop between Seattle and Tacoma. Auburn is centrally located in South King County at the intersection of SR 18 and SR 167. Auburn has existing urban rail station with a parking garage and can offer and interstate passengers a convenient boarding point. The Auburn Station currently serves over 2,500 bus passengers and 900 commuter rail passengers and is centrally located within 10 miles of 500,000 people. MAJOR TRIP GENERATORS A major transit trip generator is a location which has the potential to generate a significant number of transit trips. Included are major employers, major shopping destinations, and community activity centers. Figure 4-3 shows the area’s major transit trip generators. Among the trip generators that are currently not served by transit are the Safeway Distribution Center, UPS on C Street NW and ADESA on 37th Street NW. Emerald Downs receives transit service only via a private shuttle connection at the Auburn 15th Street NW Park-and-Ride. SCHEDULES The scheduling of transit service is often as important as route alignment and coverage in determining the success of the service. SCHEDULING TO SUCCESSFULLY SERVE EMPLOYERS One of the most overlooked aspects of transit system design is scheduled transit arrival times versus major employer shift times. While a transit system can physically serve the front door of a work site, its actual scheduled arrival times will often determine if anyone rides the system. It is not the intention of this effort to conduct an exhaustive employer shift time analysis of the community. However, an example of the challenge can be found in examining one of Auburn’s major employers, the Boeing Company. While the company’s primary morning shift time arrival occurs at 6 AM, the earliest southbound Sounder train from Seattle, arrives in Auburn at 6:36 AM. Likewise, the first run of the day for the Metro Route 181 from Federal Way and Lea Hill arrive near Boeing at approximately 6 AM, making it difficult for employees to meet the shift time. The lack of transit schedule synchronization with key employers in a community can also negatively impact other opportunities. The City of Auburn in partnership with Metro Transit was the first agency in Puget Sound to create the concept of ‘Van Share’, a specialized transit service in which vanpools carry employees to their employer’s front door from regional transit centers. Where the schedules work, such as in providing a direct link between Boeing’s Renton facilities and the Tukwila Sounder Comprehensive Transportation Plan Chapter 4. Transit Page 4- 8 commuter rail station, the concept has been highly successful. On the other end of the trip, the Van Share concept can be successfully implemented to transport employees between their homes and the Transit Station, saving capacity on the roadway and at the Transit Center parking facilities. Due to the fact that Auburn’s major employer shift times frequently don’t match Sounder and bus transit arrival times, Van Share has not yet achieved its promise in Auburn. To maximize the investment in public transit service in Auburn, it is recommended that both Sound Transit and Metro Transit conduct a thorough evaluation of their schedules with a focus on improving service to major employers in the Auburn area and in south King County in general. SERVICE FREQUENCY A second consideration in scheduling service is ensuring that enough service is available to meet the demand. Metro Transit Route 181 between Federal Way and Green River College has experienced a sharp increase in ridership in recent years. It now carries a healthy 518,000 riders per year. It is notable that ridership and productivity (rides per service hour) particularly increased on Route 181 following a set of changes in September 2003 that focused on more direct routing, expanded evening service, and improving Saturday service frequency to every 30 minutes. Sound Transit Route 565 has also benefited from an investment in additional service hours. A 45 percent increase in service hours on the route between 2002 and 2004 was mirrored by a 79 percent increase in ridership during the same period. Although absolute ridership is an important measure of effectiveness, the load factor by trip and time of day is a more accurate indicator of the need for additional service and therefore, should be examined prior implementation of any service changes. Sounder Commuter Rail has also been immensely popular, indicating that increased service is supported by the ridership demand. Each morning, Sounder already carries the equivalent of a lane of traffic on SR 167 or I-5, emphasizing the importance of expanding the service. The Auburn Station in particular is a highly successful component of the Sounder service. Total boardings at the Auburn Transit Center average over 400 riders per day on the first three morning trains, exceeding initial ridership expectations and making Auburn one of the busiest stations on the Sounder route. URBAN DESIGN The design of the build environment has direct implications on the quality and availability of transit service. Urban design can either encourage or inhibit the provision of local transit service. Some inhibitors to providing neighborhood service include inadequate street geometry and construction, lack of a satisfactory location for a terminal at the end of the route, absence of a street grid that could be used to turn around a bus, and the absence of a connected sidewalk network. Ideally, new residential developments should be laid out with future transit route alignments in mind and supporting transit facilities. Likewise, retrofits of the existing street network should accommodate transit design considerations. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 9 IMPROVING LOCAL SERVICE Over the past year, City staff, elected officials, and Metro Transit have conducted multiple meetings with the local community regarding the need for changes to local transit service. Among the most consistent themes repeated in those meeting has been the desire for improved connections from residential areas to shopping and services, especially for seniors. Many residents of Auburn have inadequate access to shopping and essential services, such as medical care. In many cases, this is attributable to lack of fixed-route bus service within a ¼ mile walking distance or inadequate schedule frequency. Although Metro Transit provides some specialized transportation services for the disabled through its ACCESS service, the vast majority of people do not qualify for paratransit services, yet are disinclined to use standard bus service for a number of reasons. Auburn and Metro Transit have partnered through the Transit Now initiative to implement a community shuttle circulator service, scheduled to begin in 2010. The shuttle will link major commercial and activity areas. Initially, the service will run on one hour headways due to funding limitations. As the service becomes more popular, increasing the service frequency may become more feasible. FACILITIES Two types of transit facility improvements stand out as important needs: commuter parking and passenger shelter upgrades. Parking needs at the Auburn Transit Center have reached a critical state. A 2009 review of the parking garage and surface parking lot revealed that on a typical weekday, general purpose parking spots were at 100% capacity. In addition, neighborhoods near the transit station, particularly those bordering West Main Street, have experienced a significant increase in commuter on-street parking, making it difficult for residents to find parking during the day and early evening. Building the infrastructure to accommodate the commuter parking demand is an essential component of making transit an attractive commute option for choice riders. In order to do so, early planning is essential to identifying the future demand and acquiring needed land. A 2009 review of the parking garage and surface parking lot revealed that on a typical weekday, general purpose parking spots were at 100% capacity. In addition, neighborhoods near the transit station, particularly those bordering West Main Street, have experienced a significant increase in commuter on-street parking, making it difficult for residents to find parking during the day and early evening. Currently, several transit stops in Auburn that meet Metro’s boarding standards for needing passenger shelters do not have shelters. These locations include:  41st Street SE and A Street SE  F Street SE and Cedar Drive  17th Street SE and B Street SE  37th Street SE and D Street SE  E. Main Street and H Street SE  2nd Street SE and A Street SE  2nd Street SE and B Street SE  9th Street NE and Auburn Way N  15th Street NE and D Street NE  Auburn Way N and 28th Street NE  Auburn Way N and 22nd Street NE  F Street SE and 25th Street SE  15th Street SW and O Street SW Comprehensive Transportation Plan Chapter 4. Transit Page 4- 10 Metro Transit should work towards providing shelters at the locations identified above, as well as other stops that meet the threshold for passenger boardings. Also, a new stop is required at A Street NE and 10th Street NE due to the recent re-routing of a Metro Transit route. This stop serves local employers and residents, including SHAG (Senior Housing Assistant Group). Future planning of changes to fixed-route services in Auburn should be accompanied by an inventory of transit passenger facilities to identify and prioritize potential improvements to shelters, benches, pads, bus zones, and customer information. Pedestrian improvements around existing or planned transit stops, including enhanced crosswalks and pedestrian refuges, should also be examined by the City. The placement of bus stops is driven by a variety of criteria including transit system operating and design standards, professional engineering field evaluation, and public input. Integrating pedestrian improvements in that process will require both procedural and programmatic changes. While painting crosswalks is a low cost, relatively quick opportunity that could be instituted quickly if identified as part of the field evaluation, building medians or signals for pedestrian refuge is a longer- term prospect and requires engineering and additional funding. 4.3 Transit System Recommendations This section contains the recommendations derived from the transit needs assessment, as discussed in the first part of this chapter. Recommendations are organized according to the lead agency that would likely implement them, with the understanding that implementation of any major system improvement will require the collaboration of many agencies. METRO TRANSIT Metro Transit initiated the Auburn-Kent project in Fall 2005; the project was completed in 2006. The purpose of the project was to work with a Sounding Board, local jurisdictions, and stakeholders to develop a set of recommendations for changes to bus service and facilities in the Auburn-Kent area that could be implemented in the future as new resources become available or through the redirection of existing resources. The project was an opportunity for the City and Metro Transit to work together to identify strategies for implementing the recommendations in this Plan.  Implement transit service from Auburn’s West Hill to the downtown, most likely routing down 51st Ave S and collecting passengers.  Implement additional transit service, particularly geared towards commuters and targeting areas outside of the walking distance of existing transit services on Lea Hill.  Examine service coverage in the Dogwood Street SE area to enhance access for the transit dependent.  Conduct a thorough evaluation of transit schedules; improve service to major employers in the Auburn area.  Expand the Route 152 to all-day, dual- direction service between Auburn and Seattle.  Install passenger shelters at stops where boardings meet Metro Transit’s standard for requiring passenger shelters. Work with the City to enhance security and reduced vandalism. Comprehensive Transportation Plan Chapter 4. Transit Page 4- 11  Add a new stop, including a possible shelter, at A St. NE and 10th St. NE.  Work with the City to create additional parking near the Auburn Transit Center to serve Metro Transit riders.  Work with the City and Sound Transit to develop strategies that improve regional connections between Auburn and other communities. PIERCE TRANSIT  Consider expanding the hours of service on Route 497 to improve service to Lakeland Hills. SOUND TRANSIT  Conduct a thorough evaluation of transit schedules; improve bus and rail service to major employers in the Auburn area.  Institute all-day, express bus service to and from Tacoma and Seattle, with regular stops along the Sounder rail line.  Work with the City and Metro Transit to develop strategies that improve regional connections between Auburn and other communities.  Immediately begin working with the City in partnership to create additional parking near the Auburn Transit Center, as specified in ST 2, the most recent voter approved regional transit package. CITY OF AUBURN  Work with the PSRC, WSDOT, Metro, Pierce, and Sound Transit to develop strategies that improve regional connections between Auburn and other communities.  Immediately begin working with Sound Transit and Metro Transit in partnership to create additional parking near the Auburn Transit Center.  Institute a program to enhance pedestrian access to transit stops.  Institute a process and seek grant funding to enhance accessibility to Metro Transit stops such as wheelchair landing pads and wheelchair ramps adjacent to accessible bus stop locations. Sources: City of Auburn, King County Metro, King County 1 3 2 nd Ave 3 7 t h W a y 2 84th Pl 37th St 316th St 316th St 56th Ave 56 t h A v e 37th St 1 2 4 t h A v c t 296th St 304th W ay 56 th Pl 288th St 284th St 37th St 28 4t h S t 37t h Pl 296th Pl 112th Ave 296th S t 112th P l 288th St 304th St 112th Ave 124th Ave Military Rd C S t Auburn Way Kersey Way 307th Pl Pea s l e y Ca n y on Rd 1st Ave 17th St M a i n S t 312th St V a l l e y H w y Stewart Rd Tapps Hwy Ellingson Rd R St Pacific Ave 3rd Ave 8th St 12th St 321st St 9th St 182nd Ave 51 s t A v e 1 0 5 t h P l 272 n d S t 320th St Jovita Blvd Valley Hwy D ier inger Hwy 15th St Valley Hwy Green Riv er R d 15t h St H a r v e y R d 34 2nd S t 2 1 0th A v e 24th St 3 31st S t 8th St Lake Holm Rd 94th P l 214th Ave R St 122nd Ave 277th St 4 6 t h P l 1 6 t h S t M St 104th Ave 55th Ave A S t A St UV164 UV18 UV167 K180 K919 K914 K180 K914 K183 K164 K952 K919 K564 K565 K565 K159 K164 K168K158 K181 K564 K952 K152 K181 K564 K181 K181 K915 K152 K164 K180 K564 K917 K564 K565K565 K565 K917 K915 K159 K180 919 910 497 910 497 919 Transit Station Surface 113 Garage 365 SR 18/Auburn-Black Diamond Rd26 SpacesPeasley CanyonRd/West Valley Hwy54 Spaces Lake Meridian P&R172 Spaces Auburn P&R358 Spaces Æa Park & Ride !!Bus Stop Bus Route Commuter Rail nm Schools Airport City Limits School Super Mall Parks Urban Center00.5 Miles ° Auburn Transportation Plan Existing TransitServing Auburn Figure 4-1 Sources: City of Auburn, King County Metro, King County 1 3 2 nd Ave 124th Ave 3 7 t h W a y 37th S t 316t h St 56th Ave 5 6 th A v e 284th Pl 37th St 1 2 4 t h Av c t 296th St 304th W ay 56 th Pl 288th St 284th St284th S t 37t h Pl 296th Pl 112th Ave 296th S t 112th P l 288th St 304th St 112th Ave Military Rd C S t Kersey Way 307th Pl Pea s l e y Ca n y on Rd 1st Ave 17t h St Main St 312th St V a l l e y H w y Stew art Rd Tapps Hwy Ellingson Rd R S t Pacific Ave 3rd Ave 8th St 12th St 321st St 9th St 182nd Ave 51st Ave 1 0 5 t h P l 272 n d S t 320th St Jovita Blvd Valley Hwy Di e ri nge r Hw y 15th S t Valley Hwy Green Rive r R d 15 th S t H arvey R d 3 42nd St 2 1 0th A v e 24th St 3 31st S t 8th St Lake Holm Rd 94th P l 214th Ave R St 122nd Ave 277th St 4 6 t h P l 1 6 t h S t M St 104th Ave 55th Ave A St A St 516 167 18 164 180 919 914 180 914 183 164 565 181 919 159 164 158 564 952 152 154 181 565 181 181 181 915 152 180 564 564 564 154 154 917 565 180 564 952 565 917 915 159 919 910 497 919 910 497 Lake Meridian P&R172 Spaces Auburn P&R358 Spaces SR 18/Auburn-Black Diamond Rd26 SpacesPeasley CanyonRd/West Valley Hwy54 Spaces Park & RideBus StopBus RouteCommuter Rail SchoolsAirportTransitDependent Areas SchoolSuper MallParksCity Limits00.5 Miles Auburn Transportation Plan TransitDependent Areas Figure 4-2 Sources: City of Auburn, King County Metro, King County !! !! !! !! !! Æa Æa Æa ÆaÆa !! !! !! !! !! !! !! !! !! !! !!!! !!!! !! !! !! !! !!!!!!!! !! !! !! !!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !! !!!! !! !! !! !! !! !! !! !!!! !! !! !!!! !! !!!! !! !!!! !! !! !!!! !! !! !!!! !! !! !!!!!!!!!!!! !! !! !! !! !! !! !!!! !! !! !! !! !!!! !! !!!! !! !! !!!! !! !!!! !! !! !! !! !! !! !! !!!! !! !! !! !!!! !! !! !! !! !! !! !! !! !! !! !!!!!! !!!!!!!! !!!! !! !! !! !! !!!!!! !! !! !!!! !!!! !! !! !! !! !! !! !! !!!! !!!!!!!!!! !! !!!! !! !!!! !! !!!! !!!! !! !! !! !! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !!!!!!!! !! !! !! !!!!!!!! !! !! !! !! !! !! !! !! !! !! !! !! !! !! !!!! !!!! !!!!!! !! !!!! !! !! !! !! !! !!!!!!!! !!!!!!!! !! !! !! !! !! !! !! !!!! !! !!!! !! !! !! !! !! !! !! !! !! !!!!!!!! !! !! !! !!!! !!!! !! !! !! !! !! !! !! !! !! !! !! !! !! ^_^_ ^_ ^_ ^_ ^_^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ 288th St 296th Pl 124th Ave 304th St 112th Ave 3 7 t h W a y 316th St 316th St 37th St 37t h S t 296th St 56 th Pl 288th St 284th St 56th Ave 56 t h A v e 2 84th Pl 1 2 4 t h A v c t 304th W ay 37th Pl37th St 28 4t h S t 112th Ave 296th S t 1 3 2 nd Ave 112t h Pl Pacific Ave 8th St Lake Holm Rd R St M St 104th Ave 55th Ave A St 307th Pl A St C S t Auburn Way 1 05 th P l4 6 t h P l Pe a s l e y C a n y o n Rd Military Rd 214th Ave 17th St Main St 312th St 1st Ave Stewart Rd Tapps Hwy Ellingson Rd Kersey Way 8th St 12th St 9th St 182nd Ave 3 31st S t 51 s t A v e 272 n d S t 320th St V a l l e y H w y Jovita Blvd Valley Hwy 1 6 t h S t 3rd Ave V a l l e y Hwy Green Riv er R d 15t h St 321st St 277th St D ier inger Hwy 34 2nd S t H a r v e y R d 94th P l 2 1 0th A v e 24th St 122nd Ave UV516 UV167 UV164 UV167 UV18 Transit Station Surface 113 Garage 365 SR 18/Auburn-Black Diamond Rd26 Spaces AuburnP&R358 Spaces Peasley CanyonRd/West Valley Hwy54 Spaces 3 4 5 6 7 8 9 10 11 12 13 14 15 21 ^_Major Trip Generators 1/4 Mile Buffer Æa Park & Ride Commuter Rail Bus Route City Limits School Urban Center Parks00.5 Miles ° Auburn Transportation Plan Transit andMajor Trip Generators Figure 4-3 Auburn RegionalMedical Center Auburn High School Auburn RiversideHigh School West AuburnHigh School YMCA Supermall Les Gove CommunityCampus SHAG (Senior HousingAssistant Group) Auburn City Hall Green RiverCommunity College Boeing / SSA / GSA Safeway DistributionCenter UPS Supply ChainSolutions ADESA 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.Muckleshoot Casino Comprehensive Transportation Plan Chapter 5. Policies Page 5- 1 CHAPTER 5. POLICIES Transportation objectives and policies establish the framework for realizing the City’s vision of its transportation system. Policies provide guidance for the City, other governmental entities and private developers, enabling the City to achieve its goal of providing adequate public infrastructure to support its needs and priorities in accordance with the City’s Comprehensive Plan. The policy framework presented below is a guideline, which the City will use to evaluate individual projects and address its infrastructure needs. The objectives and policies are organized according to five broad headings. The first heading, Coordination, Planning and Implementation, addresses the system comprehensively, detailing policies that pertain to the planning and implementation of the system as a whole. The subsequent four headings list policies specific to the following systems: Street system, Non-motorized system, Transit system, and Air transportation. The analysis of the transportation system, as well as any individual proposals, shall consider all modes of transportation and all methods of efficiently managing the network. 5.1 Coordination, Planning and Implementation OBJECTIVE: COORDINATION To be consistent with regional plans and the plans of neighboring cities, to encourage partnerships, and not to unreasonably preclude an adjacent jurisdiction from implementing its planned improvements. POLICIES: TR-1: Coordinate transportation operations, planning and improvements with other transportation authorities and governmental entities (cities, counties, tribes, state, federal) to address transportation issues. These include:  Improvement of the state highway network through strong advocacy with state officials, both elected and staff, for improvements to state highways and interchanges;  Improvements to roadways connecting Auburn to the surrounding region, including SR 167, SR 18, SR 181/West Valley Hwy, SR 164, and S 277th Street; Public Art on West Main Street Comprehensive Transportation Plan Chapter 5. Policies Page 5- 2  Improved access to the Interstate 5 corridor and regional employment centers;  Transit connections to the Regional Growth Centers;  Establishing the Auburn Station as a center for multi-modal transportation connections to proposed future intercity rail service;  Strong advocacy with US congressional members to provide funding to mitigate transportation problems connected to interstate commerce; and  Proactively pursuing forums to coordinate transportation project priorities among other governmental entities, including proposed future intercity rail service. OBJECTIVE: LONG-RANGE PLANNING & PROGRAMMING To continue to plan for the future of the multi- modal transportation system through long- range planning, programmatic planning, and financial planning, in compliance with the Growth Management Act. POLICIES: TR-2: The Comprehensive Transportation Plan shall be evaluated and amended annually to ensure it is technically accurate, consistent with state, regional, and other local plans, and in keeping with the City's vision of the future transportation system. TR-3: The Six-Year Transportation Improvement Program (TIP) and Capital Facilities Plan (CFP) shall be updated annually to reevaluate project priorities, develop a plan to fund capital improvement projects, and ensure consistency between project priorities and financing plans. Project evaluation criteria shall foster economic development, maximize utilization of city financing to match transportation grants, promote safety, integrate planning of other projects requiring disturbance of pavements, promote mobility, and optimize the utilization of existing infrastructure. OBJECTIVE: SAFETY To provide a transportation system that is safe for all users. POLICIES: TR-4: Safety shall be prioritized over driving convenience. TR-5: Use net revenues from photo enforcement operations to fund safety related projects. TR-6: Recognize the potential effects of hazards on transportation facilities and incorporate such considerations into the planning and design of transportation projects, where feasible. OBJECTIVE: CONNECTIVITY To provide a highly interconnected network of streets and trails for ease and variety of travel. POLICIES: TR-7: An efficient transportation system seeks to spread vehicle movements over a series of planned streets. The goal of the system is to encourage connectivity while preventing unacceptably high traffic volumes on any one street. Ample alternatives should exist to accommodate access for emergency vehicles. For these reasons the City will continue to plan a series of collectors and arterials designed to national standards to provide efficient service to the community. TR-8: Encourage the use of trails and other connections that provide ease of travel within and between neighborhoods, Comprehensive Transportation Plan Chapter 5. Policies Page 5- 3 community activity centers, and transit services. Development patterns that block direct pedestrian access are discouraged. Ample alternatives should exist to accommodate non-motorized transportation on arterials, collectors, and local roads. OBJECTIVE: COMPLETE STREETS Ensure Auburn’s transportation system is designed to enable comprehensive, integrated, safe access for users of all ages and abilities including pedestrians, bicyclists, motorists, transit riders and operators, and truck operators. POLICIES: TR-9: Plan for and develop a balanced transportation system, which provides safe access and connectivity to transportation facilities for users of all ages and abilities including pedestrians, bicyclists, motorists, transit users and operators, and truck operators. TR-10: Plan for, design, and construct all transportation projects, whether City led or development driven, to provide appropriate accommodation for bicyclists, pedestrians, and transit users in a manner consistent with the Comprehensive Plan, except in situations where the establishment of such facilities would be contrary to public health and safety or the cost would be excessively disproportionate to the need. TR-11: Ensure the transportation system meets the requirements outlined in the Americans with Disabilities Act (ADA). TR-12: The Auburn Engineering Design Standards is the primary vehicle for executing the Complete Streets Objective and should include standards for each roadway classification to guide implementation. TR-13: Context and flexibility in balancing user needs shall be considered in the design of all projects and if necessary, a deviation from the Auburn Engineering Design Standards may be granted to ensure the Complete Streets Objective and supporting policies are achieved. OBJECTIVE: ENVIRONMENTAL PROTECTION Minimize the environmental impacts of all new transportation projects and transportation related improvements. POLICIES: TR-14: Thoroughly evaluate the impacts of all transportation projects and apply appropriate mitigation measures in conformance with SEPA, the Critical Areas Ordinance, and other city, county, state, and federal regulations. TR-15: Identify and consider the environmental impacts of transportation projects at the earliest possible time to ensure planning and decisions reflect environmental values, to avoid delays later in the process, and to reduce or avoid potential problems that may adversely impact the environment and project outcome. Helping those with Special Needs Comprehensive Transportation Plan Chapter 5. Policies Page 5- 4 TR-16: Incorporate green technology and sustainability practices into transportation improvements whenever feasible. TR-17: Support efforts to improve air quality throughout the Auburn area and develop a transportation system compatible with the goals of the Federal and State Clean Air Acts. TR-18: Require air quality studies of future major development to assess impacts created by site generated traffic. OBJECTIVE: LEVEL-OF- SERVICE (LOS) THRESHOLD To ensure that new development does not degrade transportation facilities to below LOS standards. POLICIES: TR-19: New development shall not be allowed when the impacts of the new development on the transportation system degrades the LOS to below the adopted LOS standard, unless the impacts are mitigated concurrent with the development as described in Chapter 2. TR-20: The term "below level-of-service" shall apply to situations where traffic attributed to a development likely results in any of the following. a. An unacceptable increase in hazard or an unacceptable decrease in safety at an intersection or on a roadway segment. b. An accelerated deterioration of the street pavement condition or the proposed regular use of a street not designated as a truck route for truck movements that can reasonably result in accelerated deterioration of the street pavement. c. An unacceptable impact on geometric design conditions at an intersection where two truck routes meet on the City arterial and collector network. d. An increase in congestion which constitutes an unacceptable adverse environmental impact under the State Environmental Policy Act. e. An increase in queuing that causes blocking of adjacent land uses or intersections f. A reduction in any of the four (4) LOS standards below. 1. Arterial and Collector Corridor LOS: The level-of-service standard for each arterial and collector corridor is “D”, unless otherwise specified in Chapter 2 of this plan. The City may require a development or redevelopment to examine a shorter or longer corridor segment than is specified in Chapter 2, to ensure a project's total LOS impacts are evaluated. 2. Signalized Intersection LOS: The level-of- service standard for signalized intersections is “D”, with the following exceptions; for signalized intersections of two Arterial roads the level-of-service standard during the AM and PM peak periods is “E” for a maximum duration of 30 minutes and for signalized intersections of two Principle Arterial roads the level-of-service standard during the AM and PM peak periods is “E” for a maximum duration of 60 minutes. The City may require a development or redevelopment to examine individual signalized or roundabout intersections for LOS impacts to ensure a project's total LOS impacts are evaluated. 3. Two-Way and All-Way Stop Controlled Intersection LOS: The level-of-service standard for two-way stop controlled and all-way stop controlled intersections, is “D”. If LOS falls below the standard, analysis and mitigation may be required in a manner commensurate with the associated impacts. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 5 This may include, among other requirements, conducting a traffic signal warrant analysis and installing or financing a signal or roundabout. 4. Roundabout Intersection LOS: The level- of-service standard for roundabout controlled intersections is “D”. The City may require a development or redevelopment to examine to examine roundabout intersections for LOS impacts to ensure a project’s total LOS impacts are evaluated. TR-21: Establish a multi-modal level-of- service system in the future. TR-22: PM level of service is the city standard. AM level of service may need to be analyzed in situations where specialized conditions exist that disproportionately impact AM traffic. OBJECTIVE: CONCURRENCY To ensure transportation facilities do not fall below the adopted level-of-service standard, as required by the Growth Management Act. POLICIES: TR-23: Require developments to construct or finance transportation improvements and/or implement strategies that mitigate the impacts of new development concurrent with (within 6 years of) development, as required by the Growth Management Act. TR-24: New development that lowers a facility’s level-of-service standard below the locally adopted minimum standard shall be denied, as required by the Growth Management Act. Strategies that may allow a development to proceed include, but are not limited to:  Reducing the scope of a project (e.g. platting fewer lots or building less square footage);  Building or financing new transportation improvements concurrent with (within 6 years of) development;  Phasing/delaying a project;  Requiring the development to incorporate Transportation Demand Management strategies; or  Lowering level-of-service standards. TR-25: The denial of development in order to maintain concurrency may be grounds for declaring an emergency for the purpose of amending the Comprehensive Plan outside of the annual amendment cycle. TR-26: Evaluate city transportation facilities annually to determine compliance with the adopted level-of-service standards and, as necessary, amend the Six-Year Transportation Improvement Program (TIP) and Capital Facilities Plan (CFP) to remedy identified deficiencies. TR-27: Coordinate transportation improvements with the State, Counties, and neighboring jurisdictions to encourage through trips to occur on state facilities, reducing stress on the city street network. OBJECTIVE: FINANCE To finance the transportation systems necessary to serve new development, while ensuring the City has the capability to finance general transportation needs. POLICIES: TR-28: Require developments or redevelopments to construct transportation infrastructure systems needed to serve new developments. TR-29: Actively pursue the formation of Local Improvement Districts (LID) to upgrade existing streets and sidewalks and construct new streets to the appropriate standard. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 6 TR-30: Improvements that serve new developments will be constructed as a part of the development process. All costs will be borne by the developer when the development is served by the proposed transportation improvements. In some instances, the City may choose to participate in this construction if improvements serve more than adjacent developments. TR-31: Revenues for street transportation improvements should primarily provide for the orderly development of the City's transportation system in compliance with the Comprehensive Transportation Plan. The basic criterion for such funding should be the degree to which that project improves the overall transportation system and not the benefit that might accrue to individual properties. Where it is possible to establish a direct relationship between a needed improvement and a development, the development should be expected to contribute to its construction. TR-32: Encourage public/private partnerships for financing transportation projects that remedy existing and anticipated transportation problems, or that foster economic growth. TR-33: Aggressively seek and take advantage of federal, state, local, and private funding and lending sources that help implement the City's Comprehensive Transportation Plan. TR-34: Maintain a traffic impact fee system based on the Institute of Traffic Engineers (ITE) guidelines, as modified by the City Council, as a means of enabling development to mitigate appropriately for associated traffic impacts. TR-35: Reassess the land use element of the Comprehensive Plan if funding for transportation facilities is insufficient to maintain adopted level-of-service standards. OBJECTIVE: QUALITY OF LIFE To improve the quality of life for Auburn residents and businesses through design of the transportation system. POLICIES: TR-36: Enhance the livability of Auburn through a variety of mechanisms, including the innovative design and construction of roadways, non-motorized facilities, and associated improvements. Apply design standards that result in attractive and functional transportation facilities. OBJECTIVE: EDUCATION AND ENFORCEMENT To improve transportation safety and awareness through education and enforcement. POLICIES: TR-37: Utilize education to increase awareness of existing traffic laws and safety issues, especially as they relate to pedestrians and bicyclists. TR-38: Engage the community in transportation issues through public involvement and partnerships with organizations such as the Auburn School District. TR-39: Identify areas with persistent traffic violations and address these violations, in part, through Police Department enforcement. TR-40: Develop rider information packages that inform users of commuter, transit, rail, trail, and air transportation opportunities. TR-41: Emphasize enforcement of the "rules of the road" for pedestrians, bicyclists and motorists whose actions endanger others. Conduct enforcement in a manner that reinforces the messages found in non- motorized education & safety programs. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 7 Moving Traffic More Effectively with Intelligent Transportation Systems TR-42: Utilize photo enforcement, where appropriate, to encourage safer driving practices. OBJECTIVE: TRANSPORTATION SYSTEM MANAGEMENT (TSM) To efficiently operate the existing transportation system through Transportation System Management (TSM) strategies, thereby maximizing resources and reducing the need for costly system capacity expansion projects. POLICIES: TR-43: Use TSM strategies to more efficiently utilize the existing infrastructure to optimize traffic flow and relieve congestion. Examples include:  Rechannalization/restriping, adding turn lanes, adding /increasing number of through lanes;  Signal interconnect and optimization;  Turn movement restrictions;  Access Management; and  Intelligent Transportation Systems (ITS). TR-44: Support Intelligent Transportation Systems (ITS) implementation in coordination with Figure 2-7. Future ITS corridors will be prioritized using the following criteria.  Grants, loans, or partner funding can be leveraged to expand the ITS system on a specific corridor(s).  There is existing infrastructure that would make it easier and more cost efficient to implement ITS elements.  The corridor(s) completes a logical segment or missing link in the citywide ITS network.  Significant travel-time savings can be achieved with ITS implementation.  Corridor supports other City communication and technology needs.  ITS implementation would have significant safety benefits, including reducing the need for police flaggers in intersections during events. TR-45: ITS elements include but are not limited to:  Operational improvements such as traffic signal coordination;  Traveler information including traffic alerts and emergency notification;  Incident management; and  Traffic data collection. TR-46: Require development to contribute its share of ITS improvements as mitigation. TR-47: Program signal timing to encourage specific movements and the use of travel routes that are underutilized. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 8 OBJECTIVE: TRANSPORTATION DEMAND MANAGEMENT (TDM) To utilize transportation demand management strategies to lessen demand for increased street system capacity, help maintain the LOS standard, and enhance quality of life for those who use and benefit from the transportation system. POLICIES: TR-48: Encourage the use of high- occupancy vehicles (buses, carpool, and vanpool) through both private programs and under the direction of Metro and Pierce Transit. TR-49: Promote reduced employee travel during the daily peak travel periods through flexible work schedules and programs to allow employees to work part-time or full- time or at alternate work sites closer to home. TR-50: Encourage employers to provide TDM measures in the workplace through such programs as preferential parking for high-occupancy vehicles, car sharing, improved access for transit vehicles, and employee incentives for using high- occupancy vehicles. TR-51: In making funding decisions, consider transportation investments that support transportation demand management approaches by providing alternatives to single-occupant vehicles, such as transit, bikeways and pedestrian paths. TR-52: Recognize emerging TDM strategies such as tolling, variable-priced lanes, and car sharing may be effective in certain situations. TR-53: Coordinate with Metro and other jurisdictions to enhance Commute Trip Reduction (CTR) programs for CTR employers in Auburn. TR-54: Lead by example through implementation of a thorough and successful Commute-Trip Reduction (CTR) Program for City employees. OBJECTIVE: PARKING To ensure adequate coordination of parking needs with traffic and development needs. POLICIES: TR-55: On-street parking should be allowed only when consistent with the function of the street and with traffic volumes. TR-56: New developments should provide adequate off-street parking to meet their needs. TR-57: Develop and maintain regulations, which foster a balance between meeting the need for public parking and ensuring developers provide adequate parking to meet the demand generated by new development. TR-58: In certain cases, such as in the Regional Growth Center and in areas with high pedestrian and transit use, it may be appropriate to reduce the developer parking obligation to achieve other community benefits or employ innovative parking strategies such as the use of "park & walk" lots, where people could park their vehicles and walk to nearby destinations. TR-59: The City shall evaluate new residential subdivisions with constrained space for driveways, utility services, street lights, street trees, and fire hydrants and the resultant impact on the provision of adequate on-street parking. Where appropriate, the City shall require the subdivision to provide dispersed locations of on-street parking (or street accessible parking) to meet their needs in addition to the zoning code required off-street parking. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 9 OBJECTIVE: PARK-AND-RIDE To support development of a regional park- and ride lot system by Metro Transit, Pierce Transit, Sound Transit, and the Washington State Department of Transportation. POLICIES: TR-60: Encourage park & ride lots on sites adjacent to compatible land uses with convenient access to the Auburn Transit Station, SR 18, SR 167, and all regional transportation corridors. TR-61: Work proactively with Sound Transit, WSDOT, Metro Transit, and Pierce Transit to ensure the adequate supply of park & ride capacity in Auburn. OBJECTIVE: RIGHT-OF-WAY To retain and preserve existing right-of-way, and identify and acquire new right-of-way as needed to achieve the City's objectives. POLICIES: TR-62: The acquisition and preservation of right-of-way is a key component of maintaining a viable transportation system. Methods used to acquire and preserve right- of-way include:  Requiring dedication of right-of-way as a condition of development;  Purchasing right-of-way at fair market value; and  Acquiring development rights and easements from property owners. TR-63: Preserve and protect existing right- of-way through the issuance of permits such as ROW Use permits and franchise and public way agreements, by monitoring and responding to right-of-way encroachments and safety impacts, and by limiting vacations of public right-of-way. TR-64: Vacate right-of-way only when it clearly will not be a future need or to support economic development. OBJECTIVE: MAINTENANCE AND PRESERVATION To maintain the City’s transportation system at a level that is comparable with the design standards applied to new facilities. POLICIES: TR-65: Establish programs and schedules for the level and frequency of roadway and non-motorized system maintenance. TR-66: In order to help ensure the long term preservation of the city street system, the City prohibits heavy vehicles that exceed lawful load limits for state highways from traveling on city streets, unless the City permits such travel via the issuance of a temporary haul permit that requires appropriate mitigation. TR-67: Establish standards of street repair and seek to obtain sufficient financing to attain and maintain a safe system in good condition. TR-68: Continue to implement the “Save Our Streets” program for maintenance and rehabilitation of local streets. TR-69: Create an arterial streets maintenance and rehabilitation program, including development of an implementation timeline and strategy, for arterial and collector streets in Auburn. TR-70: The City maintains the option of closing streets when freezing conditions are present to prevent frost damage. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 10 5.2 Street System OBJECTIVE: FUNCTIONAL CLASSIFICATION To provide an integrated street network of appropriate classes of streets designed to facilitate different types of traffic flows and access needs. POLICIES: TR-71: The city street system is made up of three classes of streets: a. Arterials - a system of city, county, and state streets designed to move traffic to or from major traffic and activity generators. Arterials should be adequate in number, appropriately situated, and designed to accommodate moderate to high traffic volumes with a minimum of flow disruption. b. Collectors - a system of city streets that collect traffic and move it from the local street system to the arterial street system. c. Local streets - a system of city streets, which collect traffic from individual sites and conveys the traffic to the collector and arterial systems. TR-72: The Functional Roadway Classifications Map will serve as the adopted standard for identifying classified streets in the City of Auburn and the potential annexation areas. TR-73: Ensure all streets classified in the Comprehensive Transportation Plan are federally classified. TR-74: Street standards shall be developed, modified, and implemented that reflect the street classification system and function. The design and management of the street network shall seek to improve the appearance of existing street corridors. Streets are recognized as an important component of the public spaces within the City and should include, where appropriate, landscaping to enhance the appearance of city street corridors. The standards should include provisions for streetscaping. TR-75: The classification standards adopted in the Auburn Engineering Design Standards are considered the City’s minimum standards for new streets. In cases in which the City attempts to rebuild an existing street within an established right-of-way, the City Council reserves the authority to determine if additional right-of-way should be obtained in order to realize the improvement. Preservation of neighborhood continuity and cohesiveness will be respected. Save Our Streets - Patching Treatment Save Our Streets - Overlay Comprehensive Transportation Plan Chapter 5. Policies Page 5- 11 TR-76: The standards for residential streets may be modified in cross section to provide better relationships between the different components of the street including, but not limited to, on-street parking, the landscape strip, and the sidewalk. Among other objectives, this may be done to balance the need to provide adequate parking and buffer pedestrians from traffic. TR-77: These minimum standards do not limit or prevent developers from providing facilities that exceed the City’s standards. OBJECTIVE: ARTERIALS To provide an efficient arterial street network. POLICIES: TR-78: The City has two classes of arterials, as follows. a. Principal Arterials convey traffic along commercial or industrial activities, and provide access to freeways. They emphasize mobility and de-emphasize access to adjacent land uses. Principal arterial streets are typically constructed to accommodate five lanes of traffic. Principal Arterial: 15th Street NW b. Minor Arterials convey traffic onto principal arterials from collector and local streets. They place slightly more emphasis on land access and offer a lower level of mobility than principal arterials. Minor arterial streets are typically constructed to accommodate four lanes of traffic. TR-79: Encourage King and Pierce counties to develop and implement a similar system of arterial designations within Auburn's potential annexation area. TR-80: Designate new arterials to serve developing areas concurrent with approval of such development. Arterials shall be spaced in compliance with good transportation network planning principles, and support the importance of overall system circulation. OBJECTIVE: COLLECTORS To provide an efficient collector street network, which transitions traffic from the local street network to the arterial street system. POLICIES: TR-81: The City has three classes of collectors as follows: a. Residential Collectors, Type I are used to connect local streets and residential neighborhoods to community activity centers and minor and principal arterials. b. Non-Residential Collectors connect non- residential areas such as industrial and commercial areas to minor and principal arterials. c. Residential Collectors, Type II are routes that connect residential neighborhoods with less intensive land uses to activity centers, regardless of traffic volume. They are often constructed to a lesser standard than Residential Collectors, Type I and Non- Residential Collector streets. TR-82: Encourage King and Pierce counties to develop and implement a similar system Comprehensive Transportation Plan Chapter 5. Policies Page 5- 12 of collector designations within Auburn's potential annexation area. TR-83: Designate new collectors to serve developing areas concurrent with approval of such development. Collectors shall be spaced in compliance with good transportation network planning principles, and support the importance of overall system circulation. OBJECTIVE: LOCAL STREETS To provide an effective street system for local traffic while maintaining community access. POLICIES: TR-84: The local street system is comprised of all roadway facilities not part of the higher classification system and is designed to provide direct access between abutting land uses and the collector/arterial systems. The local street types are as follows: a. Local Residential Streets, Type I serve primarily residential areas. b. Local Non-Residential Streets serve primarily industrial and manufacturing land uses. c. Local Residential Streets, Type II provide access to residential areas that tend to have less intensive land uses. d. Private Streets are privately owned by the communities they serve and are only permitted under the guidance outlined in the Private Streets Objective and supporting policies. TR-85: Access Tracts may be permitted, as long as emergency access can be guaranteed at all times. TR-86: The local street network shall be developed to maximize the efficiency of the transportation network in residential areas and minimize through traffic in neighborhoods.  The internal local residential street network for a subdivision should be designed to discourage regional through traffic and non-residential traffic from penetrating the subdivision or adjacent subdivisions.  Where possible, streets shall be planned, designed and constructed to connect to future development.  When applicable, non-motorized paths shall be provided at the end of dead end streets to shorten walking distances to an adjacent arterial or public facilities including, but not limited to, schools and parks.  Residential developments should be planned in a manner that minimizes the number of local street accesses to arterials and collectors.  To promote efficient connectivity between areas of the community, existing stub end streets shall be linked to other streets in new development whenever the opportunity arises and the resulting traffic volumes are not likely to exceed acceptable volumes as identified in the Auburn Engineering Design Standards. OBJECTIVE: PRIVATE STREETS To discourage the development of private streets and ensure, if they are permitted by the City, they are constructed and maintained according to City standards. POLICIES: TR-87: Private streets are discouraged, but may be permitted on a discretionary basis, as regulated by city code and the Auburn Engineering Design Standards. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 13 TR-88: If a private street is permitted, it must be built to public street standards as identified in the Auburn Engineering Design Standards and Construction Standards manuals. TR-89: Private streets must provide for emergency vehicle access and be privately maintained by an approved association or business. The City does not maintain private streets. OBJECTIVE: ACCESS MANAGEMENT To limit and provide access to the street network in a manner which improves and maintains public safety and roadway capacity. POLICIES: TR-90: Seek consolidation of access points to state highways, arterials, and collectors. This will benefit the highway and city street system, reduce interference with traffic flows on arterials, and discourage through traffic on local streets. To achieve this level of access control, the City:  Adopts and supports the State’s controlled access policy on all state highway facilities;  May acquire access rights along some arterials and collectors;  Adopts design standards that identify access standards for each type of functional street classification;  Encourages consolidation of access in developing commercial and high density residential areas through shared use of driveways and local access streets; and  Will establish standards for access management, develop a planning process to work with the community and implement access management solutions on arterial corridors. TR-91: Strive to prevent negative impacts to existing businesses, without compromising safety, when implementing access management. OBJECTIVE: THROUGH TRAFFIC To accommodate through traffic in the City as efficiently as possible, with a minimum of disruption to neighborhoods. POLICIES: TR-92: Continue to coordinate with the Washington State Department of Transportation to facilitate the movement of traffic through the City. TR-93: Encourage the State and Counties to develop through routes, which minimize the impact of through traffic on Auburn's residential neighborhoods. TR-94: Actively solicit action by the State and Counties to program and construct those improvements needed to serve Auburn to the state and county arterial and freeway systems. OBJECTIVE: TRAFFIC CALMING To employ traffic calming techniques to improve safety and neighborhood quality. POLICIES: TR-95: Implement the City’s traffic calming program to improve neighborhood safety and quality. TR-96: The traffic calming program shall require a technical analysis of existing conditions and appropriate treatments before actions are taken to fund and implement traffic calming measures. TR-97: The traffic calming program shall incorporate neighborhood involvement and seek community support. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 14 TR-98: New construction should incorporate traffic calming measures, as appropriate. OBJECTIVE: FREIGHT MOVEMENTS To facilitate the movements of freight and goods through Auburn with minimal adverse traffic and other environmental impacts. POLICIES: TR-99: The movement of freight and goods is recognized as an important component of Auburn’s transportation system. TR-100: The movement of freight and goods which serve largely national, state, or regional needs should take place in such a way so that the impacts on the local transportation system are minimized. These movements should take place primarily on state highways, Interstates, or on grade- separated rail corridors in order to minimize the local impacts. TR-101: Seek public and private partners to leverage funds for freight improvement projects and associated mitigation. TR-102: Continue to work with the Freight Mobility Roundtable, FAST, FMSIB, and other local and regional groups to ensure regional needs are met, and local impacts are mitigated. TR-103: All through truck trips and the majority of local trips shall take place on designated truck routes, as identified on the truck route map, Figure 2-7, of the Comprehensive Transportation Plan. This policy shall not apply to developments and uses operating under existing right-of-way use permits, traffic mitigation agreements or equivalent agreements directly related to the regulation of permitted haul routes. TR-104: If the City is unable to acquire funding to maintain existing truck routes to a Pavement Condition Index Standard of 70 on a segment of roadway, that route may be restricted or closed to truck travel. TR-105: Work towards designing and constructing future truck routes, as identified on the truck route map in Chapter 2 of the Comprehensive Transportation Plan, to sustain routine truck traffic. TR-106: Local truck trips that have origins and/or destinations in Auburn may have to sometimes use routes not designated as truck routes. The City may approve the use of alternate routes not currently designated as truck routes for truck traffic, with appropriate mitigation. Approval may be made through issuance of right-of-way use permits, traffic mitigation agreements or equivalent agreements. TR-107: Development shall be required to mitigate the impacts of construction generated truck traffic on the City’s transportation system, based on the City’s LOS standard. TR-108: Temporary haul routes for overweight or oversized vehicles shall be permitted under circumstances acceptable to the City and with appropriate mitigation. A temporary haul permit must be obtained prior to the hauling of oversized or overweight freight. TR-109: Truck traffic in residential neighborhoods shall be prohibited, except for local deliveries within said neighborhood, unless no other possible route is available, in which case mitigation may be required. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 15 OBJECTIVE: LATECOMER POLICY To enable private investors to recover a portion of improvement costs for transportation facility improvements that benefit other developments. POLICIES: TR-110: The City may enter into latecomer agreements where substantial transportation investments are made by one party that legitimately should be reimbursed by others, such as, when the infrastructure improvement will benefit a future development. Such agreements will be at the discretion of the City Council. Latecomer agreements do not apply to situations in which a property owner is required to construct improvements per an existing city code provision, such as in the case of half-street and other frontage improvements. OBJECTIVE: ROUNDABOUTS To seek air quality, safety, and capacity benefits by promoting the use of roundabouts over traffic signals. POLICIES: TR-111: Intersections controlled with roundabouts are preferred over signalized intersections whenever feasible and appropriate due to the benefits achieved with roundabouts including reduced collision rate for vehicles and pedestrians, less severe collisions, smoother traffic flow, reduced vehicle emissions and fuel consumption, lower long-term maintenance costs, and improved aesthetics. TR-112: Developments required to signalize an intersection as mitigation for a project may be required to install a roundabout instead of a traffic signal. The feasibility of acquiring the land needed for a roundabout will be considered as a factor in this requirement 5.3 Non-motorized System OBJECTIVE: PLANNING THE NON-MOTORIZED SYSTEM To plan a coordinated, interconnected network of non-motorized transportation facilities that effectively provide access to local and regional destinations, improve overall quality of life, and support healthy community and environmental principles. POLICIES: TR-113: Implement land use regulations and encourage site design that promotes non- motorized forms of transportation. TR-114: Include the role of non-motorized transportation in all transportation planning, programming, and if suitable, capital improvement projects. TR-115: Plan for continuous non-motorized circulation routes within and between existing, new or redeveloping commercial, residential, and industrial developments. Transportation planning shall seek to allow Interurban Trail at W Main Street Comprehensive Transportation Plan Chapter 5. Policies Page 5- 16 pedestrians and bicyclists the ability to cross or avoid barriers in a manner that is safe and convenient. TR-116: Actively seek to acquire land along corridors identified for future trail development in the Comprehensive Transportation Plan and Auburn Parks, Recreation, & Open Space Plan 2005 and subsequent Park plans. TR-117: Schedule, plan and co-sponsor events that support recreational walking and bicycling. These events should emphasize their recreational and health values and introduce people to the transportation capabilities of bicycling and walking. TR-118: Improve and protect the non- motorized transportation system through the establishment of level-of-service goals for non-motorized facilities. OBJECTIVE: DEVELOPING THE NON-MOTORIZED SYSTEM To build a safe, attractive, and inter- connected non-motorized transportation system. POLICIES: TR-119: Develop and maintain the non- motorized system, including bike routes, walkways and equestrian paths, to encourage significant recreational use. TR-120: Develop and maintain the non- motorized system, including bike routes, sidewalks, and multi-use paths in a manner that promotes non-motorized travel as a viable mode of transportation. TR-121: Develop the non-motorized system to accommodate appropriate alternative forms of non-motorized transport, as well as medically necessary motorized transport. TR-122: Appropriate street furniture, lighting, signage, and landscaping should be installed along non-motorized routes to increase safety and to ensure that facilities are inviting to users. TR-123: Clearly sign and mark major non- motorized routes to guide travelers and improve safety. TR-124: Non-motorized routes shall be constructed to accommodate emergency vehicle access and be amenable to law enforcement. TR-125: Locate and design non-motorized transportation systems so that they contribute to the safety, efficiency, enjoyment and convenience of residential neighborhoods. TR-126: The development of facilities supporting non-motorized transportation should be provided as a regular element of new construction projects. Improvements shall be secured through the development review process. TR-127: Minimize hazards and obstructions on the non-motorized transportation system by properly designing, constructing, managing, and maintaining designated routes in the system. OBJECTIVE: PEDESTRIAN TRAVEL To enhance and encourage pedestrian travel in Auburn. POLICIES: TR-128: Promote pedestrian travel within the city and connections to adjacent communities with emphasis placed on safety and on connectivity to priority destinations such as schools, parks, the downtown, and other pedestrian-oriented areas. Pedestrian- oriented areas are those areas with high pedestrian traffic or potential and are identified in this plan. These areas and Comprehensive Transportation Plan Chapter 5. Policies Page 5- 17 streets shall encourage pedestrian travel by providing enhanced pedestrian improvements or controls on motorized traffic. TR-129: Focus investments on and aggressively seek funding for the high priority pedestrian corridors, identified in Figure 3-2. TR-130: Require developers to incorporate pedestrian facilities into new development and redevelopment in conformance with the Auburn City Code. TR-131: Continue to construct new and rehabilitate existing sidewalks through a sidewalk improvement program. TR-132: Seek ways to provide pedestrian amenities such as streetlights, trees, seating areas, signage, and public art along all major pedestrian travel routes. TR-133: Work towards buffering pedestrian walkways from moving traffic, particularly in areas with high levels of pedestrian movements, such as near schools and commercial areas, and along corridors with heavy vehicular traffic. TR-134: Pedestrian crossings shall be developed at locations with significant pedestrian traffic and designed to match pedestrian desire lines. TR-135: Encourage the formation of LIDs to develop pedestrian pathways and other non-motorized amenities throughout the City. Partner with the local school districts to improve Safe Walking Routes to School. OBJECTIVE: BICYCLE TRAVEL To improve Auburn's bicycling network. POLICIES: TR-136: Develop programs and publications, and work with local employers to encourage citywide bicycle commuting. TR-137: Designate, develop, and maintain high priority bicycle routes, in conformance with Figure 3-4, that create an interconnected system of bike facilities for local and regional travel, including on-street bike routes, and multi-purpose trails. TR-138: During the development review process, ensure projects are consistent with the Non-motorized chapter of the Comprehensive Transportation Plan by requiring right-of-way dedications and other improvements as needed to develop the bicycle network. TR-139: Focus investments on and aggressively seek funding for the high priority future bicycle corridors, identified in Figure 3-4 and corridors and connectors, as applicable, specified in Figure 3-5. TR-140: Encourage the inclusion of convenient and secure bicycle storage facilities in all large public and private developments. TR-141: Develop and implement Sharrows and associated Share the Road signage in residential and some non-residential areas of City. To test effectiveness and overall public response, the implementation of a Sharrows program with associated Share the Road signage should be initially conducted through a pilot program. TR-142: Continue installation of bike lanes in parts of City where there is existing/adequate right-of-way. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 18 TR-143: Develop an Auburn specific bicycle signage program to highlight corridors, connectors and in-city/out of city destinations. TR-144: Make improvements to existing Interurban Trail – signage, pavement conditions, vegetation maintenance, grade crossings, and upgrades to user facilities at Main Street crossing. TR-145: Develop a capital improvement program project with cost estimate for the design and construction of bicycle/pedestrian bridge at southern terminus of M St. west of existing Stuck River Vehicle Bridge. TR-146: Develop a capital improvement program project with cost estimate for the design and construction of innovative and safe pedestrian/bicycle crossing at M St./Auburn Way South intersection. TR-147: Install one or more bike boxes through a pilot program approach to test effectiveness and public response. Focus pilot program efforts at key intersections such as the West Main Street and C Street intersection, the M Street and Auburn Way South intersection and the Ellingson Road and A Street intersection. TR-148: Install bicycle/pedestrian crossing warning systems along Interurban Trail at all crossing locations consisting of 277th Street, 37th St. NW, West Main Street and 15th Street SW. TR-149: Develop an official Auburn Bicycling Guide Map. TR-150: In coordination with the City Council, Mayor’s Office, Auburn Area Chamber of Commerce, Auburn Tourism Board and appropriate City departments develop strategies and actions for the implementation of the bicycle oriented economic development recommendations of the Auburn Bicycle Task Force. OBJECTIVE: EQUESTRIAN TRAVEL To improve Auburn's equestrian environment. POLICIES: TR-151: Strive to incorporate equestrian facilities into the design of trail and transportation facilities, where possible and appropriate. These efforts should be concentrated south of the White River in Auburn's southeast corner and in Lea Hill, but considered for other areas of the City. TR-152: Transportation projects, and other public and private projects, in lower-density neighborhoods should be evaluated, and where possible, planned, designed and constructed to be compatible with equestrian use. TR-153: Create an interconnected system of safe equestrian trails and provide adequate equestrian amenities adjacent to those trails. 5.4 Transit System OBJECTIVE: TRANSIT SERVICES To encourage the continued development of public transit systems and other alternatives to single occupant vehicle travel, to relieve traffic congestion, to reduce reliance on the automobile for personal transportation needs, to improve route coverage and scheduling, and to ensure transit is a convenient and reliable mode option for both local and regional trips. TR-154: Partner with WSDOT, Metro Transit, Pierce Transit, and Sound Transit to achieve Auburn's transit and passenger rail objectives. Comprehensive Transportation Plan Chapter 5. Policies Page 5- 19 TR-155: Work with local and regional transit agencies to serve new and existing trip generators in Auburn, such as colleges, commercial areas, and community facilities. TR-156: Encourage Sound Transit, Metro Transit, and Pierce Transit to expand transit to underserved areas of Auburn. TR-157: Partner with WSDOT, Amtrak, and Sound Transit to establish an intercity passenger rail stop at the Auburn Station. TR-158: Consider both the transit impacts and the opportunities presented by major development proposals when reviewing development under the State Environmental Policy Act. TR-159: Encourage the inclusion of transit facilities in new development when appropriate. TR-160: Encourage bus stops to be located at well lit areas. TR-161: Work with transit providers and regional agencies to develop a transit system that is fully accessible to pedestrians and the physically challenged, and which integrates the access, safety, and parking requirements of bicyclists. TR-162: Identify areas of concentrated transit traffic and impose design and construction standards that accommodate the unique considerations associated with bus travel, such as street geometry and pedestrian linkages. TR-163: Work with transit providers to create new commuter – oriented transit routes and maintain existing commuter routes linked with Sounder commuter rail. 5.5 Air Transportation OBJECTIVE: AIR TRANSPORTATION To provide an efficient municipal airport, serving light general aviation aircraft, as an integral part of the City’s transportation system. POLICIES: TR-164: Continue to develop the Auburn Municipal Airport in accordance with the Airport Master Plan. TR-165: The airport shall be managed as a general aviation facility; the use of jet aircrafts and helicopters that create noise and land use conflicts shall be evaluated, in conformance with FAA regulations. TR-166: The siting of new airport facilities shall consider neighborhood impacts such as increased noise generated from the use of those facilities. TR-167: Use of the airport by non- conventional aircraft such as ultra lights shall be discouraged, in conformance with FAA regulations. TR-168: The City’s zoning ordinance and other appropriate regulatory measures shall enforce the airport clear zones as regulated by the Federal Aviation Administration (FAA). The impact of development on air safety shall be assessed through SEPA review, and appropriate mitigation measures shall be required by the City. TR-169: Minimize or eliminate the potentially adverse effects of light and glare on the operation of the Auburn Airport. Comprehensive Transportation Plan Chapter 6. Funding Page 6- 1 CHAPTER 6. FUNDING The ability to finance the transportation system is critical to the implementation of this plan and the success of the future transportation system. Funding is needed to realize the capital improvements and maintenance activities outlined in this plan. This chapter details the financial planning tools and funding mechanisms available to accomplish these improvements. 6.1 Financial Planning and Programming The City reassesses its financial plan annually in order to ensure programmed transportation improvements are financially feasible and prioritized in accordance with funding availability. The Transportation Improvement Program and Capital Facilities Plan are the two financial planning documents the City uses to identify its financial strategy for implementing transportation improvements. TRANSPORTATION IMPROVEMENT PROGRAM The City adopts a six-year Transportation Improvement Program (TIP) annually, which lists programmed transportation improvements on the arterial and collector systems, including intersection and non- motorized improvements. Transportation needs are identified by examining the latest information concerning safety and accident history, growth trends, the traffic model, traffic studies, and the Comprehensive Transportation Plan. The TIP adoption process also includes a revenue forecast and analysis of available funding. Projects are then prioritized according to a number of factors including safety, capacity needs, access needs, and the likelihood of securing funding. The first three years of the TIP must be financially constrained, so project programming is often limited due to funding limitations. The TIP is an important tool for identifying funding needs and developing a financial plan for project implementation. It also feeds into the Capital Facilities Plan. CAPITAL FACILITIES PLAN The Capital Facilities Plan (CFP) is the Comprehensive Plan element, which identifies the financial plan for implementing all capital improvements in Auburn. Transportation improvements are included in the Capital Facilities Plan, which is amended annually. The Capital Facilities Plan enables the City to fulfill the GMA requirement of having a multiyear financing plan based on identified transportation needs. It also enables the City to make informed decisions about its investment of public dollars and make timely Auburn City Hall Comprehensive Transportation Plan Chapter 6. Funding Page 6- 2 decisions about maintaining levels-of-service in accordance with the Comprehensive Plan standards. 6.2 Funding Sources The City uses a combination of public and private funding sources to implement transportation improvements in Auburn, both for maintenance activities and capital improvements. GENERAL TAX REVENUES The City receives tax revenues from a variety of state, regional, and local sources including the real estate excise tax, sales tax, and the motor vehicle fuel tax. Despite these revenues, the City has numerous maintenance and capital improvement needs that cannot be met by existing tax revenues alone. Recognizing the need to raise additional revenues for the local street system, Auburn residents approved the ‘Save Our Streets’ (SOS) program in 2004, and in doing so, created a funding program to help rehabilitate Auburn’s residential streets. With the success of the ‘Save Our Streets’ program, the City intends to pursue a program that will help fund arterial and collector street maintenance. The City does have an Arterial Street Fund; however, these funds have proven inadequate in addressing all the maintenance and capital needs of the arterial system. GRANTS The City has an active grant program and continually seeks grants, both private and public, to improve Auburn’s transportation system. The following is a list of some of the grants the City has historically applied for and will likely apply for again in the future. FEDERALLY FUNDED PROGRAMS The Transportation Enhancements Program funds projects designed to strengthen the cultural, aesthetic, and environmental aspects of the inter-modal transportation system. The program provides for the implementation of a variety of non- traditional projects, including the restoration of historic transportation facilities, the construction of bicycle and pedestrian facilities, landscaping and scenic beautification, and the mitigation of water pollution from highway runoff. The Surface Transportation Program (STP) provides flexible funding that may be used by states and localities for projects on any public road, non-motorized improvements, bridge projects, and transit capital projects. The Safety Program is a federal program targeted at reducing accident rates at intersections and along corridors, particularly at those locations with higher than average fatality and injury rates. The Congestion Mitigation and Air Quality (CMAQ) program is a federally funded program administered through PSRC. CMAQ funds projects and programs in air quality non-attainment and maintenance areas, which reduce transportation related emissions. In addition to the aforementioned programs, the federal government has an annual appropriations bill. Auburn may apply through the offices of Washington senators and congressional members for funding for specific projects. This funding source has historically been a successful means of financing some of the City’s more expensive capital improvement projects. Comprehensive Transportation Plan Chapter 6. Funding Page 6- 3 FEDERAL LEGISLATION In August 2005, the federal government reauthorized SAFETEA-LU (Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users), a $286.5 billion, six-year transpor- tation bill that will provide funding for many of the federal grant programs discussed above, as well as several new funding programs. The 2009 American Recovery and Reinvestment Act also dedicates funding to numerous programs, many of which can be used to help finance the City’s programmed transportation improvement projects. STATE FUNDED PROGRAMS The Safe Routes to Schools Program is a state and federally funded program that aims to protect children from traffic related deaths and injuries and promotes a healthy lifestyle by encouraging bicycling and walking to school. The Pedestrian and Bicycle Safety Grant is a state funded program that funds non- motorized safety improvements. The Transportation Improvement Board (TIB) administers annual grant programs that fund roadway and non-motorized projects that improve safety, mobility, capacity, and promote economic development. The TIB offers several programs, each of which emphasizes different funding criteria. The Community Economic Revitali- zation Board (CERB) is a state funded program that provides low-cost financing for public facility improvements that are required for private development. LOANS There are several low-interest loans available to municipalities, such as the Public Works Trust Fund Loan. These loans can be strategically employed to leverage grant funding by providing a local match, enabling the City to compete for funding for public infrastructure projects. In addition, the City has the option of issuing bonds for public infrastructure projects. PRIVATE SECTOR CONTRIBUTIONS TRAFFIC IMPACT FEES The City has an established traffic impact fee system based on the Institute of Traffic Engineers (ITE) guidelines, as adjusted by the City Council. The fee system estimates the amount of traffic each development is likely to create, based on the land use and size. Traffic impact fees compensate the City for the impact new development is expected to have on the City street system. In turn, the City uses the revenues to expand the street network through system-wide capacity improvements. FACILITY CONTRIBUTIONS In lieu of traffic impact fees, a developer can improve a facility in a manner commensurate with the traffic impact the development is projected to generate. These contributions do not relieve developers of their obligation to provide half street improvements including curb, gutter, sidewalk, drainage, and street paving adjacent to their developing property. FUNDING PARTNERSHIPS The City has successfully formed several funding partnerships, which have enabled it Comprehensive Transportation Plan Chapter 6. Funding Page 6- 4 to leverage its resources in implementing transportation improvements. LOCAL IMPROVEMENT DISTRICTS Local Improvement Districts (LID) enable city investment in a specified area by leveraging city funds with contributions from property owners in the district. In essence, LID’s are a means of using limited city resources to improve neighborhood quality through improvement of streets, sidewalks, and other features of the roadway. FAST (FREIGHT ACTION STRATEGY TEAM) FAST is an innovative partnership composed of transportation agencies, ports, cities, economic development organizations, trucking, rail, and business interests. One of FAST’s primary objectives is to obtain funding for projects that improve freight mobility. FAST helped fund the S 277th Street Grade Separation and the 3rd Street SW Grade Separation. FAST is also working on securing funds to help implement the M Street Grade Separation project. FMSIB (FREIGHT MOBILITY STRATEGIC INVESTMENT BOARD) The mission of the Freight Mobility Strategic Investment Board (FMSIB) is to create a comprehensive and coordinated state program to facilitate freight movement to local, national, and international markets. FMSIB is also charged with lessening the impact of freight movements on local communities. FMSIB obtains funding directly from legislative appropriations and has committed funds to the M Street Grade Separation project. FUTURE FINANCING POSSIBILITIES As the transportation system evolves, so will the range of financing options available to the City. In general, the financing options currently available under state law fall short of meeting current and anticipated transportation improvement needs. Hence, the City will continue to seek fair and sustainable strategies for funding the maintenance activities and capital improvements needed to preserve the City’s transportation network. Among other strategies, the implementation of a street utility may be employed to fund many of the City’s transportation needs. STREET UTILITY A street utility would be used similarly to how sewer and water utility fees are now collected. A monthly or annual fee would be charged to residents and businesses in Auburn, for example via a flat fee or through a pro-rated fee based on anticipated usage. The implementation of a street utility would require a change in state law. The street utility system is one in which all residents and businesses would pay their fair share of funding street maintenance and repair. If eventually implemented, a street utility would undoubtedly be combined with a suite of other financing strategies the City currently employs. 6.3 Funding Strategies and Project Prioritization The City uses a variety of criteria to prioritize transportation projects, including safety, mobility, and overall community benefit. In addition, the City also considers the availability of funding and the ability to leverage city dollars to raise addition funds. For example, grants are often available for specific types of capital investments, whereas they are more limited for maintenance and preservation. Hence, the City often needs to budget for maintenance through tax Comprehensive Transportation Plan Chapter 6. Funding Page 6- 5 revenues. Capital improvements may be financially secured through a combination of public and private investment. Hence, project prioritization for capital improvements is often partially dependent on the ability to secure outside funding. Likewise, maintenance and preservation is highly dependent on the limited tax revenues available to the City. In the future, the City will need to continue lobbying for its share of federal, state, and county tax revenues, seek creative avenues for securing private investment dollars and grant funds, and potentially implement new funding strategies such as tolling and street utility fees. Comprehensive Transportation Plan Chapter 7. Monitoring and Evaluation Page 7- 1 CHAPTER 7. MONITORING AND EVALUATION The Comprehensive Transportation Plan, a long-range plan with the horizon year 2030, anticipates the needs and conditions of the future transportation system, enabling the City to aptly plan for its current and future needs. Nonetheless, the transportation network is dynamic, constantly evolving due to circumstances beyond the scope and influence of this plan. Hence, regular updates are necessary to ensure the Plan remains current and relevant. 7.1 Annual Updates The Comprehensive Transportation Plan will be amended annually as part of the City’s regular Comprehensive Plan amendment cycle, which ensures proposed changes go through a public review process before the amended plan is adopted by the City Council at the end of the calendar year. In preparation for the annual amendment cycle, the City will review the plan and propose updates as needed. These proposed updates may be due to shifts in City priorities, the availability of new information, or the relevance of certain plan components. REEVALUATION The annual reevaluation process provides an opportunity for the City to evaluate progress made in implementing the Plan, as well as identify new needs that have arisen since the previous update. The City will look at its street, non-motorized and transit systems, and assess whether the Plan adequately addresses the implementation strategies necessary to ensure the transportation infrastructure continues to grow in line with the City’s objectives. As part of this process, the City will review its future projects list and update the Capital Facilities Plan as appropriate. It will also review and update the Policies and Funding chapters, in order to remain consistent with the City’s vision and current with potential funding strategies. TECHNICAL INFORMATION The Comprehensive Transportation Plan contains a range of technical data, much of which informs other elements of the Plan. As part of the annual amendment cycle, technical information, such as traffic volumes, current level-of-service, roadway classifications, and transit route and ridership information will be updated. This new information will inform much of the evaluative process, enabling the City to quantify system changes over a period of time and make apt decisions in planning the future system. Auburn Time Transit Center Clock Comprehensive Transportation Plan Chapter 7. Monitoring and Evaluation Page 7- 2 MODEL UPDATES The City’s traffic model shall be updated on a regular basis, every few years, as new land use, employment, and housing data becomes available. Model updates are important as they ensure the City has an accurate understanding of how land use patterns, employment, and other factors impact future transportation conditions, enabling the City Council to make informed policy decisions. The model also provides an understanding of the impacts associated with different projects, allowing the City to devise a revised list of future projects to improve capacity and safety, as well as achieve other priorities. COMPREHENSIVE PLAN CONSISTENCY The annual evaluation process is an opportunity to ensure the Comprehensive Transportation Plan is consistent with other elements of the City’s Comprehensive Plan, including the land use element, economic development element, Auburn Parks, Recreation and Open Space Plan, and the Capital Facilities Plan. Hence, as part of the annual amendment cycle, the City will ensure these plan components are consistent with and supportive of each other. 7.2 Multi-Year Updates Although the City will go through a formal process of updating the Comprehensive Transportation Plan annually, a more exhaustive process is periodically necessary. Hence, a thorough rewrite of the Plan shall be conducted every five to eight years. This endeavor will include a broad public outreach effort with input from neighboring jurisdictions, state and regional agencies, and Auburn residents and businesses. Much like the process for the 2005 and 2009 updates, it will present an opportunity to holistically examine the current transportation system and lay the framework for development of the future system.