Loading...
HomeMy WebLinkAboutCP1308 BT.pdf10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 1 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:A - Water Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1-04.4 Minor Changes 1 Eq. Adj.10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 2 1-07.15 SPCC Plan 1 LS 2,000.00 2,000.00$ 1,000.00 1,000.00$ 2,500.00 2,500.00$ 1,000.00 1,000.00$ 3 1-07.16 Property Restoration 1 LS 2,000.00 2,000.00$ 400.00 400.00$ 3,500.00 3,500.00$ 5,000.00 5,000.00$ 4 1-07.17 Utility Potholing 16 EA 1,500.00 24,000.00$ 460.00 7,360.00$ 1,700.00 27,200.00$ 300.00 4,800.00$ 5 1-09.7 Mobilization 1 LS 55,000.00 55,000.00$ 46,300.00 46,300.00$ 55,000.00 55,000.00$ 84,800.00 84,800.00$ 6 1-10.5 Traffic Control Supervisor 1 LS 7,500.00 7,500.00$ 700.00 700.00$ 7,500.00 7,500.00$ 7,500.00 7,500.00$ 7 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)320 HR 50.00 16,000.00$ 40.00 12,800.00$ 55.00 17,600.00$ 47.00 15,040.00$ 8 1-10.5 Construction Signs Class A 200 SF 10.00 2,000.00$ 5.00 1,000.00$ 30.00 6,000.00$ 20.00 4,000.00$ 9 1-10.5 Portable Changeable Message Sign 20 Day 240.00 4,800.00$ 62.00 1,240.00$ 150.00 3,000.00$ 80.00 1,600.00$ 10 1-10.5 Outside Agency Uniformed Police Flagging Labor 1 Eq. Adj.1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 11 1-10.5 Other Temporary Traffic Control 1 LS 2,000.00 2,000.00$ 7,000.00 7,000.00$ 6,000.00 6,000.00$ 4,800.00 4,800.00$ 12 2-02 Removal of Structures and Obstructions 1 LS 3,000.00 3,000.00$ 1,200.00 1,200.00$ 1,700.00 1,700.00$ 1,000.00 1,000.00$ 13 2-02 Remove Raised Pavement Markings 1 LS 750.00 750.00$ 134.00 134.00$ 450.00 450.00$ 1,500.00 1,500.00$ 14 2-02 Remove Flexible Pavement 140 SY 12.00 1,680.00$ 26.00 3,640.00$ 13.00 1,820.00$ 8.00 1,120.00$ 15 2-02 Remove and Reset Fencing 20 LF 70.00 1,400.00$ 26.00 520.00$ 35.00 700.00$ 40.00 800.00$ 16 2-09 Shoring or Extra Excavation Class B 1500 SF 2.00 3,000.00$ 11.85 17,775.00$ 4.00 6,000.00$ 1.00 1,500.00$ 17 4-04 Crushed Surfacing Top Course 70 TON 30.00 2,100.00$ 24.00 1,680.00$ 16.00 1,120.00$ 30.00 2,100.00$ 18 4-04 Crushed Surfacing Base Course 150 TON 30.00 4,500.00$ 24.00 3,600.00$ 16.00 2,400.00$ 20.00 3,000.00$ 19 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)15 TON 110.00 1,650.00$ 170.00 2,550.00$ 180.00 2,700.00$ 200.00 3,000.00$ 20 5-04 HMA Cl. 1-inch PG 64-22 (Class E)70 TON 110.00 7,700.00$ 170.00 11,900.00$ 180.00 12,600.00$ 200.00 14,000.00$ 21 5-04 Planing Bituminous Pavement 105 SY 8.00 840.00$ 46.00 4,830.00$ 44.00 4,620.00$ 33.00 3,465.00$ 22 5-04 Asphalt Cold Patch 20 TON 110.00 2,200.00$ 116.00 2,320.00$ 150.00 3,000.00$ 130.00 2,600.00$ 23 7-08 Pipe Foundation Material 5 TON 40.00 200.00$ 27.00 135.00$ 130.00 650.00$ 80.00 400.00$ 24 7-08 CSTC for Select Trench Backfill and Pipe Bedding 300 TON 35.00 10,500.00$ 24.00 7,200.00$ 16.00 4,800.00$ 26.00 7,800.00$ 25 7-08 Removal of Contaminated Soil 1 Eq. Adj.10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 26 7-09 Abandon Existing Water Main (8 In.)135 LF 10.00 1,350.00$ 20.00 2,700.00$ 35.00 4,725.00$ 8.00 1,080.00$ 27 7-09 Abandon Existing Water Main (12 In.)116 LF 12.00 1,392.00$ 25.00 2,900.00$ 40.00 4,640.00$ 9.00 1,044.00$ 28 7-09 Abandon Existing Water Main (2 In.)165 LF 5.00 825.00$ 6.00 990.00$ 30.00 4,950.00$ 8.00 1,320.00$ 29 7-09 Connect to Existing Water Main 5 EA 2,200.00 11,000.00$ 4,000.00 20,000.00$ 4,500.00 22,500.00$ 1,800.00 9,000.00$ 30 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 12 In. Diam.38 LF 200.00 7,600.00$ 260.00 9,880.00$ 330.00 12,540.00$ 200.00 7,600.00$ 31 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 8 In. Diam.51 LF 150.00 7,650.00$ 160.00 8,160.00$ 250.00 12,750.00$ 200.00 10,200.00$ 32 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 6 In. Diam.16 LF 60.00 960.00$ 100.00 1,600.00$ 235.00 3,760.00$ 200.00 3,200.00$ 33 7-12 Gate Valve 12 In. Diam 2 EA 2,200.00 4,400.00$ 1,970.00 3,940.00$ 2,100.00 4,200.00$ 2,500.00 5,000.00$ 34 7-12 Gate Valve 8 In. Diam.2 EA 1,800.00 3,600.00$ 1,540.00 3,080.00$ 1,100.00 2,200.00$ 1,500.00 3,000.00$ 35 7-12 Gate Valve 6 In. Diam.1 EA 1,200.00 1,200.00$ 830.00 830.00$ 790.00 790.00$ 950.00 950.00$ 36 7-12 Gate Valve 2 In. Diam.2 EA 150.00 300.00$ 391.83 783.66$ 450.00 900.00$ 600.00 1,200.00$ 37 7-12 Adjust Valve Box 6 EA 250.00 1,500.00$ 500.00 3,000.00$ 170.00 1,020.00$ 300.00 1,800.00$ 38 7-15 Service Connection 2 In.12 LF 30.00 360.00$ 75.00 900.00$ 60.00 720.00$ 50.00 600.00$ 39 7-15 12 In. Steel Casing with 2 In. Diam. Poly Carrier Pipe 68 LF 150.00 10,200.00$ 560.00 38,080.00$ 320.00 21,760.00$ 100.00 6,800.00$ 40 7-15 Water Service Connection Renewal 3 EA 1,000.00 3,000.00$ 1,200.00 3,600.00$ 1,200.00 3,600.00$ 600.00 1,800.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 2 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:A - Water Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 41 7-20 Auger Boring 12 In. Steel Casing with 6 In. Diam. DI Carrier Pipe 77 LF 400.00 30,800.00$ 780.00 60,060.00 975.00 75,075.00$ 520.00 40,040.00$ 42 7-20 Auger Boring 20 In. Steel Casing with 8 In. Diam. DI Carrier Pipe 103 LF 600.00 61,800.00$ 790.00 81,370.00$ 975.00 100,425.00$ 797.00 82,091.00$ 43 7-20 Auger Boring 24 In. Steel Casing with 12 In. Diam. DI Carrier Pipe 124 LF 750.00 93,000.00$ 800.00 99,200.00$ 975.00 120,900.00$ 1,094.00 135,656.00$ 44 7-20 Removing Steel Casing Obstructions 1 Eq. Adj. 5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 45 8-01 Temporary Water Pollution/Erosion Control 1 Eq. Adj 2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 46 8-01 ESC Lead 60 Day 150.00 9,000.00$ 20.00 1,200.00$ 175.00 10,500.00$ 100.00 6,000.00$ 47 8-01 TESC Plan Preparation 1 LS 2,000.00 2,000.00$ 1,000.00 1,000.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 48 8-01 Hydroseeding with Moderate-Term Mulch 40 SY 4.00 160.00$ 10.00 400.00$ 12.00 480.00$ 30.00 1,200.00$ 49 8-04 Remove and Reinstall QWICK Curb 30 LF 60.00 1,800.00$ 24.00 720.00$ 15.00 450.00$ 50.00 1,500.00$ 50 8-05 Dewatering System – Main Street 1 Eq. Adj.15,000.00 15,000.00$ 15,000.00 15,000.00$ 15,000.00 15,000.00$ 15,000.00 15,000.00$ 51 8-05 Dewatering System – 37th Street NW 1 Eq. Adj.8,000.00 8,000.00$ 8,000.00 8,000.00$ 8,000.00 8,000.00$ 8,000.00 8,000.00$ 52 8-05 Dewatering System - Black Diamond 1 Eq. Adj.3,000.00 3,000.00$ 3,000.00 3,000.00$ 3,000.00 3,000.00$ 3,000.00 3,000.00$ 53 8-09 Raised Pavement Marker Type 2 8 EA 5.00 40.00$ 6.00 48.00$ 40.00 320.00$ 40.00 320.00$ 54 8-20 Induction Loop Type 3, Stop Line (3x6 ft. Diam.)1 EA 1,500.00 1,500.00$ 4,000.00 4,000.00$ 1,300.00 1,300.00$ 1,000.00 1,000.00$ 55 8-22 Plastic Traffic Arrow 1 EA 110.00 110.00$ 250.00 250.00$ 400.00 400.00$ 200.00 200.00$ 56 8-22 Paint Line 40 LF 2.00 80.00$ 11.00 440.00$ 12.00 480.00$ 14.00 560.00$ 57 8-22 Plastic Traffic Letter 4 EA 50.00 200.00$ 155.00 620.00$ 175.00 700.00$ 175.00 700.00$ 58 8-22 Plastic Wide Line 140 LF 3.00 420.00$ 7.00 980.00$ 8.00 1,120.00$ 8.00 1,120.00$ Schedule Subtotal 465,567.00$ 540,515.66$ 641,365.00$ 551,306.00$ Applied Tax 44,228.87$ 51,348.99$ 60,929.68$ 52,374.07$ SCHEDULE TOTAL 509,795.87$ 591,864.65$ 702,294.68$ 603,680.07$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 3 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:A - Water Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 1 1-04.4 Minor Changes 1 Eq. Adj.10,000.00 10,000.00$ 2 1-07.15 SPCC Plan 1 LS 500.00 500.00$ 3 1-07.16 Property Restoration 1 LS 2,000.00 2,000.00$ 4 1-07.17 Utility Potholing 16 EA 100.00 1,600.00$ 5 1-09.7 Mobilization 1 LS 50,000.00 50,000.00$ 6 1-10.5 Traffic Control Supervisor 1 LS 5,000.00 5,000.00$ 7 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)320 HR 50.00 16,000.00$ 8 1-10.5 Construction Signs Class A 200 SF 10.00 2,000.00$ 9 1-10.5 Portable Changeable Message Sign 20 Day 100.00 2,000.00$ 10 1-10.5 Labor 1 Eq. Adj.1,500.00 1,500.00$ 11 1-10.5 Other Temporary Traffic Control 1 LS 7,000.00 7,000.00$ 12 2-02 Removal of Structures and Obstructions 1 LS 10,000.00 10,000.00$ 13 2-02 Remove Raised Pavement Markings 1 LS 2,000.00 2,000.00$ 14 2-02 Remove Flexible Pavement 140 SY 25.00 3,500.00$ 15 2-02 Remove and Reset Fencing 20 LF 50.00 1,000.00$ 16 2-09 Shoring or Extra Excavation Class B 1500 SF 1.00 1,500.00$ 17 4-04 Crushed Surfacing Top Course 70 TON 50.00 3,500.00$ 18 4-04 Crushed Surfacing Base Course 150 TON 40.00 6,000.00$ 19 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)15 TON 215.00 3,225.00$ 20 5-04 HMA Cl. 1-inch PG 64-22 (Class E)70 TON 215.00 15,050.00$ 21 5-04 Planing Bituminous Pavement 105 SY 20.00 2,100.00$ 22 5-04 Asphalt Cold Patch 20 TON 200.00 4,000.00$ 23 7-08 Pipe Foundation Material 5 TON 50.00 250.00$ 24 7-08 Bedding 300 TON 40.00 12,000.00$ 25 7-08 Removal of Contaminated Soil 1 Eq. Adj.10,000.00 10,000.00$ 26 7-09 Abandon Existing Water Main (8 In.)135 LF 15.00 2,025.00$ 27 7-09 Abandon Existing Water Main (12 In.)116 LF 20.00 2,320.00$ 28 7-09 Abandon Existing Water Main (2 In.)165 LF 5.00 825.00$ 29 7-09 Connect to Existing Water Main 5 EA 5,000.00 25,000.00$ 30 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 12 In. Diam.38 LF 500.00 19,000.00$ 31 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 8 In. Diam.51 LF 450.00 22,950.00$ 32 7-09 Special Cl. 52 Ductile Iron Pipe for Water Main 6 In. Diam.16 LF 400.00 6,400.00$ 33 7-12 Gate Valve 12 In. Diam 2 EA 2,000.00 4,000.00$ 34 7-12 Gate Valve 8 In. Diam.2 EA 1,500.00 3,000.00$ 35 7-12 Gate Valve 6 In. Diam.1 EA 1,000.00 1,000.00$ 36 7-12 Gate Valve 2 In. Diam.2 EA 500.00 1,000.00$ 37 7-12 Adjust Valve Box 6 EA 200.00 1,200.00$ 38 7-15 Service Connection 2 In.12 LF 50.00 600.00$ 39 7-15 12 In. Steel Casing with 2 In. Diam. Poly Carrier Pipe 68 LF 590.00 40,120.00$ 40 7-15 Water Service Connection Renewal 3 EA 2,500.00 7,500.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 4 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:A - Water Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 41 7-20 Auger Boring 12 In. Steel Casing with 6 In. Diam. DI Carrier Pipe 77 LF 590.00 45,430.00$ 42 7-20 Auger Boring 20 In. Steel Casing with 8 In. Diam. DI Carrier Pipe 103 LF 750.00 77,250.00$ 43 7-20 Auger Boring 24 In. Steel Casing with 12 In. Diam. DI Carrier Pipe 124 LF 750.00 93,000.00$ 44 7-20 Removing Steel Casing Obstructions 1 Eq. Adj. 5,000.00 5,000.00$ 45 8-01 Temporary Water Pollution/Erosion Control 1 Eq. Adj 2,000.00 2,000.00$ 46 8-01 ESC Lead 60 Day 100.00 6,000.00$ 47 8-01 TESC Plan Preparation 1 LS 500.00 500.00$ 48 8-01 Hydroseeding with Moderate-Term Mulch 40 SY 20.00 800.00$ 49 8-04 Remove and Reinstall QWICK Curb 30 LF 25.00 750.00$ 50 8-05 Dewatering System – Main Street 1 Eq. Adj.15,000.00 15,000.00$ 51 8-05 Dewatering System – 37th Street NW 1 Eq. Adj.8,000.00 8,000.00$ 52 8-05 Dewatering System - Black Diamond 1 Eq. Adj.3,000.00 3,000.00$ 53 8-09 Raised Pavement Marker Type 2 8 EA 35.00 280.00$ 54 8-20 Induction Loop Type 3, Stop Line (3x6 ft. Diam.)1 EA 3,000.00 3,000.00$ 55 8-22 Plastic Traffic Arrow 1 EA 350.00 350.00$ 56 8-22 Paint Line 40 LF 11.00 440.00$ 57 8-22 Plastic Traffic Letter 4 EA 155.00 620.00$ 58 8-22 Plastic Wide Line 140 LF 7.00 980.00$ Schedule Subtotal 571,065.00$ Applied Tax 54,251.18$ SCHEDULE SUBTOTAL 625,316.18$ BID TABULATION SCHEDULE SUMMARY 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 5 Project Name: CP1308, BNSF Utility Crossings, 14-04 Schedule No.:A - Water Utility Improvement Prepared by:City of Auburn Bid Date: ENGINEER'S ESTIMATE:465,567.00$ AVERAGE BID AMOUNT:576,062.92$ BID SPREAD AMOUNT:100,849.34$ BID Amount Spread $Spread % LOW BIDDER:Pacific Civil & Infrastructure 540,515.66$ 74,948.66$ 16.10% Second Bidder:RW Scott Construction 551,306.00$ 85,739.00$ 18.42% Basic BID (Tax not Included) Pacific Civil & Infrastructure 540,515.66$ James W. Fowler Co.641,365.00$ RW Scott Construction 551,306.00$ R.L. Alia Company 571,065.00$ 9/30/14 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 6 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:B - Storm Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 59 1-04.4 Minor Changes 1 Eq. Adj. 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 60 1-07.15 SPCC Plan 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 61 1-07.17 Utility Potholing 5 EA 1,500.00 7,500.00$ 460.00 2,300.00$ 1,700.00 8,500.00$ 400.00 2,000.00$ 62 1-09.7 Mobilization 1 LS 37,000.00 37,000.00$ 11,000.00 11,000.00$ 44,000.00 44,000.00$ 84,800.00 84,800.00$ 63 1-10.5 Traffic Control Supervisor 1 LS 4,000.00 4,000.00$ 500.00 500.00$ 7,700.00 7,700.00$ 8,500.00 8,500.00$ 64 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 40.00 9,600.00$ 55.00 13,200.00$ 47.00 11,280.00$ 65 1-10.5 Construction Signs Class A 100 SF 10.00 1,000.00$ 5.00 500.00$ 30.00 3,000.00$ 20.00 2,000.00$ 66 1-10.5 Portable Changeable Message Sign 20 Day 240.00 4,800.00$ 62.00 1,240.00$ 150.00 3,000.00$ 80.00 1,600.00$ 67 1-10.5 Outside Agency Uniformed Police Flagging Labor 1 Eq. Adj. 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 68 1-10.5 Other Temporary Traffic Control 1 LS 2,000.00 2,000.00$ 3,890.00 3,890.00$ 4,200.00 4,200.00$ 4,800.00 4,800.00$ 69 2-02 Removal of Structures and Obstructions 1 LS 5,000.00 5,000.00$ 500.00 500.00$ 1,000.00 1,000.00$ 1,000.00 1,000.00$ 70 2-02 Remove Raised Pavement Markings 1 LS 500.00 500.00$ 365.00 365.00$ 450.00 450.00$ 1,500.00 1,500.00$ 71 2-02 Removal of Curb and Gutter 75 LF 15.00 1,125.00$ 4.00 300.00$ 16.00 1,200.00$ 10.00 750.00$ 72 2-02 Removal of Cement Conc. Driveway 11 SY 15.00 165.00$ 4.00 44.00$ 48.00 528.00$ 30.00 330.00$ 73 2-02 Removal of Sidewalk 40 SY 12.00 480.00$ 4.00 160.00$ 22.00 880.00$ 30.00 1,200.00$ 74 2-02 Remove Flexible Pavement 135 SY 12.00 1,620.00$ 12.80 1,728.00$ 13.00 1,755.00$ 8.00 1,080.00$ 75 2-02 Removal of Cement Conc. Pavement 100 SY 20.00 2,000.00$ 32.00 3,200.00$ 26.00 2,600.00$ 20.00 2,000.00$ 76 2-09 Shoring or Extra Excavation Class B 1650 SF 2.00 3,300.00$ 2.00 3,300.00$ 4.00 6,600.00$ 1.00 1,650.00$ 77 4-04 Crushed Surfacing Top Course 40 TON 30.00 1,200.00$ 17.00 680.00$ 16.00 640.00$ 30.00 1,200.00$ 78 4-04 Crushed Surfacing Base Course 55 TON 30.00 1,650.00$ 17.00 935.00$ 16.00 880.00$ 30.00 1,650.00$ 79 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)30 TON 110.00 3,300.00$ 170.00 5,100.00$ 180.00 5,400.00$ 200.00 6,000.00$ 80 5-04 HMA Cl. 1-inch PG 64-22 (Class E)20 TON 110.00 2,200.00$ 170.00 3,400.00$ 180.00 3,600.00$ 200.00 4,000.00$ 81 5-04 Planing Bituminous Pavement 225 SY 8.00 1,800.00$ 23.00 5,175.00$ 23.00 5,175.00$ 21.00 4,725.00$ 82 5-04 Asphalt Cold Patch 15 TON 110.00 1,650.00$ 116.00 1,740.00$ 150.00 2,250.00$ 130.00 1,950.00$ 83 7-04 Abandon Existing Storm Sewer (24 In.)140 LF 40.00 5,600.00$ 30.00 4,200.00$ 50.00 7,000.00$ 16.00 2,240.00$ 84 7-04 Abandon Existing Storm Sewer (12 In.)150 LF 20.00 3,000.00$ 5.00 750.00$ 45.00 6,750.00$ 16.00 2,400.00$ 85 7-04 Solid Wall Polyvinyl Chloride (PVC) Storm Pipe SDR 21, 24 In. Diam.53 LF 150.00 7,950.00$ 300.00 15,900.00$ 370.00 19,610.00$ 412.00 21,836.00$ 86 7-04 Solid Wall Polyvinyl Chloride (PVC) Storm Pipe, SDR 35, 12 In. Diam.122 LF 100.00 12,200.00$ 32.50 3,965.00$ 87.00 10,614.00$ 75.00 9,150.00$ 87 7-04 High Density Polyethylene Pipe (HDPE) Storm Pipe DR 21, 28 In. Diam.10 LF 175.00 1,750.00$ 94.00 940.00$ 500.00 5,000.00$ 700.00 7,000.00$ 88 7-04 Storm Sewer Television Inspection 400 LF 4.00 1,600.00$ 6.04 2,416.00$ 1.00 400.00$ 1.90 760.00$ 89 7-04 Temporary Storm Sewer Bypass System (3rd St. NW)1 LS 20,000.00 20,000.00$ 3,500.00 3,500.00$ 3,500.00 3,500.00$ 25,000.00 25,000.00$ 90 7-05 Manhole, Type 1, 54 In. Diam.4 EA 5,500.00 22,000.00$ 5,525.00 22,100.00$ 6,700.00 26,800.00$ 7,500.00 30,000.00$ 91 7-05 Manhole, Type 2, 48 In. Diam.1 EA 4,500.00 4,500.00$ 3,130.00 3,130.00$ 4,000.00 4,000.00$ 4,500.00 4,500.00$ 92 7-05 Connect to Existing Manhole 1 EA 3,000.00 3,000.00$ 1,600.00 1,600.00$ 2,700.00 2,700.00$ 5,000.00 5,000.00$ 93 7-08 Pipe Foundation Material 10 TON 40.00 400.00$ 27.00 270.00$ 130.00 1,300.00$ 60.00 600.00$ 94 7-08 CSTC for Select Trench Backfill and Pipe Bedding 175 TON 35.00 6,125.00$ 24.00 4,200.00$ 16.00 2,800.00$ 28.00 4,900.00$ 95 7-08 Removal of Contaminated Soil 1 Eq. Adj.1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 96 7-20 Auger Boring 36 In. Steel Casing with 28 In. Diam. HDPE Carrier Pipe 104 LF 1,000.00 104,000.00$ 1,120.00 116,480.00$ 1,035.00 107,640.00$ 1,497.00 155,688.00$ 97 7-20 Remove Steel Casing Obstructions 1 Eq. Adj.5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 98 7-21 Slipline Storm Pipe 42 Inch Diam.110 LF 400.00 44,000.00$ 420.00 46,200.00$ 460.00 50,600.00$ 700.00 77,000.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 7 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:B - Storm Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 99 8-01 TESC Plan Preparation 1 LS 2,000.00 2,000.00$ 1,000.00 1,000.00$ 2,800.00 2,800.00$ 1,500.00 1,500.00$ 100 8-01 ESC Lead 60 Day 150.00 9,000.00$ 20.00 1,200.00$ 175.00 10,500.00$ 100.00 6,000.00$ 101 8-01 Hydroseeding with Moderate-Term Mulch 60 SY 5.00 300.00$ 15.00 900.00$ 10.00 600.00$ 20.00 1,200.00$ 102 8-01 Biodegradable Erosion Control Blanket 60 SY 4.00 240.00$ 10.00 600.00$ 6.00 360.00$ 10.00 600.00$ 103 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 104 8-04 Cement Conc. Traffic Curb and Gutter 75 LF 30.00 2,250.00$ 23.00 1,725.00$ 43.00 3,225.00$ 30.00 2,250.00$ 105 8-04 Remove and Reinstall QWICK Curb 35 LF 60.00 2,100.00$ 21.00 735.00$ 15.00 525.00$ 50.00 1,750.00$ 106 8-05 Dewatering System – 3rd Street NW 1 Eq. Adj.13,000.00 13,000.00$ 13,000.00 13,000.00$ 13,000.00 13,000.00$ 13,000.00 13,000.00$ 107 8-05 Dewatering System – 37th Street NW 1 Eq. Adj.17,000.00 17,000.00$ 17,000.00 17,000.00$ 17,000.00 17,000.00$ 17,000.00 17,000.00$ 108 8-06 Industrial and Commercial Driveway Apron 25 SY 90.00 2,250.00$ 70.00 1,750.00$ 150.00 3,750.00$ 100.00 2,500.00$ 109 8-09 Raised Pavement Marker Type 2 8 EA 5.00 40.00$ 35.00 280.00$ 40.00 320.00$ 40.00 320.00$ 110 8-14 Cement Conc. Sidewalk 30 SY 65.00 1,950.00$ 50.00 1,500.00$ 130.00 3,900.00$ 55.00 1,650.00$ 111 8-22 Paint Line 115 LF 2.00 230.00$ 3.00 345.00$ 12.00 1,380.00$ 4.00 460.00$ 112 8-22 Plastic Stop Bar 13 LF 8.00 104.00$ 25.00 325.00$ 12.00 156.00$ 30.00 390.00$ 113 8-22 Plastic Railroad Crossing Symbol 1 EA 800.00 800.00$ 600.00 600.00$ 550.00 550.00$ 700.00 700.00$ 114 8-22 Plastic Wide Line 12 LF 3.00 36.00$ 7.00 84.00$ 8.00 96.00$ 8.00 96.00$ Schedule Subtotal 403,715.00$ 342,852.00$ 446,234.00$ 560,505.00$ Applied Tax 38,352.93$ 32,570.94$ 42,392.23$ 53,247.98$ SCHEDULE TOTAL 442,067.93$ 375,422.94$ 488,626.23$ 613,752.98$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 8 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:B - Storm Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 59 1-04.4 Minor Changes 1 Eq. Adj. 10,000.00 10,000.00$ 60 1-07.15 SPCC Plan 1 LS 500.00 500.00$ 61 1-07.17 Utility Potholing 5 EA 100.00 500.00$ 62 1-09.7 Mobilization 1 LS 50,000.00 50,000.00$ 63 1-10.5 Traffic Control Supervisor 1 LS 5,000.00 5,000.00$ 64 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 65 1-10.5 Construction Signs Class A 100 SF 10.00 1,000.00$ 66 1-10.5 Portable Changeable Message Sign 20 Day 100.00 2,000.00$ 67 1-10.5 Labor 1 Eq. Adj. 1,500.00 1,500.00$ 68 1-10.5 Other Temporary Traffic Control 1 LS 10,000.00 10,000.00$ 69 2-02 Removal of Structures and Obstructions 1 LS 10,000.00 10,000.00$ 70 2-02 Remove Raised Pavement Markings 1 LS 2,000.00 2,000.00$ 71 2-02 Removal of Curb and Gutter 75 LF 1.00 75.00$ 72 2-02 Removal of Cement Conc. Driveway 11 SY 10.00 110.00$ 73 2-02 Removal of Sidewalk 40 SY 10.00 400.00$ 74 2-02 Remove Flexible Pavement 135 SY 20.00 2,700.00$ 75 2-02 Removal of Cement Conc. Pavement 100 SY 20.00 2,000.00$ 76 2-09 Shoring or Extra Excavation Class B 1650 SF 1.00 1,650.00$ 77 4-04 Crushed Surfacing Top Course 40 TON 50.00 2,000.00$ 78 4-04 Crushed Surfacing Base Course 55 TON 40.00 2,200.00$ 79 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)30 TON 215.00 6,450.00$ 80 5-04 HMA Cl. 1-inch PG 64-22 (Class E)20 TON 215.00 4,300.00$ 81 5-04 Planing Bituminous Pavement 225 SY 20.00 4,500.00$ 82 5-04 Asphalt Cold Patch 15 TON 200.00 3,000.00$ 83 7-04 Abandon Existing Storm Sewer (24 In.)140 LF 50.00 7,000.00$ 84 7-04 Abandon Existing Storm Sewer (12 In.)150 LF 40.00 6,000.00$ 85 7-04 Solid Wall Polyvinyl Chloride (PVC) Storm Pipe SDR 21, 24 In. Diam.53 LF 270.00 14,310.00$ 86 7-04 Solid Wall Polyvinyl Chloride (PVC) Storm Pipe, SDR 35, 12 In. Diam.122 LF 230.00 28,060.00$ 87 7-04 High Density Polyethylene Pipe (HDPE) Storm Pipe DR 21, 28 In. Diam.10 LF 350.00 3,500.00$ 88 7-04 Storm Sewer Television Inspection 400 LF 10.00 4,000.00$ 89 7-04 Temporary Storm Sewer Bypass System (3rd St. NW)1 LS 15,000.00 15,000.00$ 90 7-05 Manhole, Type 1, 54 In. Diam.4 EA 6,000.00 24,000.00$ 91 7-05 Manhole, Type 2, 48 In. Diam.1 EA 5,000.00 5,000.00$ 92 7-05 Connect to Existing Manhole 1 EA 4,000.00 4,000.00$ 93 7-08 Pipe Foundation Material 10 TON 50.00 500.00$ 94 7-08 Bedding 175 TON 40.00 7,000.00$ 95 7-08 Removal of Contaminated Soil 1 Eq. Adj.1,500.00 1,500.00$ 96 7-20 Auger Boring 36 In. Steel Casing with 28 In. Diam. HDPE Carrier Pipe 104 LF 1,900.00 197,600.00$ 97 7-20 Remove Steel Casing Obstructions 1 Eq. Adj.5,000.00 5,000.00$ 98 7-21 Slipline Storm Pipe 42 Inch Diam.110 LF 1,000.00 110,000.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 9 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:B - Storm Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 99 8-01 TESC Plan Preparation 1 LS 1,000.00 1,000.00$ 100 8-01 ESC Lead 60 Day 100.00 6,000.00$ 101 8-01 Hydroseeding with Moderate-Term Mulch 60 SY 20.00 1,200.00$ 102 8-01 Biodegradable Erosion Control Blanket 60 SY 10.00 600.00$ 103 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 104 8-04 Cement Conc. Traffic Curb and Gutter 75 LF 40.00 3,000.00$ 105 8-04 Remove and Reinstall QWICK Curb 35 LF 25.00 875.00$ 106 8-05 Dewatering System – 3rd Street NW 1 Eq. Adj.13,000.00 13,000.00$ 107 8-05 Dewatering System – 37th Street NW 1 Eq. Adj.17,000.00 17,000.00$ 108 8-06 Industrial and Commercial Driveway Apron 25 SY 60.00 1,500.00$ 109 8-09 Raised Pavement Marker Type 2 8 EA 35.00 280.00$ 110 8-14 Cement Conc. Sidewalk 30 SY 50.00 1,500.00$ 111 8-22 Paint Line 115 LF 3.00 345.00$ 112 8-22 Plastic Stop Bar 13 LF 25.00 325.00$ 113 8-22 Plastic Railroad Crossing Symbol 1 EA 600.00 600.00$ 114 8-22 Plastic Wide Line 12 LF 5.00 60.00$ Schedule Subtotal 615,640.00$ Applied Tax 58,485.80$ SCHEDULE SUBTOTAL 674,125.80$ BID TABULATION SCHEDULE SUMMARY 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 10 Project Name: CP1308, BNSF Utility Crossings, 14-04 Schedule No.:B - Storm Utility Improvement Prepared by: City of Auburn Bid Date: ENGINEER'S ESTIMATE:403,715.00$ AVERAGE BID AMOUNT:491,307.75$ BID SPREAD AMOUNT:272,788.00$ BID Amount Spread $Spread % LOW BIDDER:Pacific Civil & Infrastructure 342,852.00$ (60,863.00)$ -15.08% Second Bidder:James W. Fowler Co.446,234.00$ 42,519.00$ 10.53% Basic BID (Tax not Included) Pacific Civil & Infrastructure 342,852.00$ James W. Fowler Co.446,234.00$ RW Scott Construction 560,505.00$ R.L. Alia Company 615,640.00$ 9/30/14 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 11 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:C - Sanitary Sewer Utility Improvement Prepared By:City of Auburn Bid Date:41912 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 115 1-04.4 Minor Changes 1 Eq. Adj. 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 10,000.00 10,000.00$ 116 1-07.15 SPCC Plan 1 LS 2,000.00 2,000.00$ 1,000.00 1,000.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 117 1-07.16 Property Restoration 1 LS 1,000.00 1,000.00$ 800.00 800.00$ 3,500.00 3,500.00$ 5,000.00 5,000.00$ 118 1-07.17 Utility Potholing 6 EA 1,500.00 9,000.00$ 460.00 2,760.00$ 1,700.00 10,200.00$ 300.00 1,800.00$ 119 1-09.7 Mobilization 1 LS 30,000.00 30,000.00$ 11,000.00 11,000.00$ 31,000.00 31,000.00$ 54,800.00 54,800.00$ 120 1-10.5 Traffic Control Supervisor 1 LS 4,000.00 4,000.00$ 500.00 500.00$ 7,500.00 7,500.00$ 8,500.00 8,500.00$ 121 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 40.00 9,600.00$ 55.00 13,200.00$ 47.00 11,280.00$ 122 1-10.5 Construction Signs Class A 100 SF 10.00 1,000.00$ 5.00 500.00$ 30.00 3,000.00$ 20.00 2,000.00$ 123 1-10.5 Portable Changeable Message Sign 20 Day 240.00 4,800.00$ 62.00 1,240.00$ 150.00 3,000.00$ 80.00 1,600.00$ 124 1-10.5 Outside Agency Uniformed Police Flagging Labor 1 Eq. Adj.1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 125 1-10.5 Other Temporary Traffic Control 1 LS 1,500.00 1,500.00$ 2,100.00 2,100.00$ 4,200.00 4,200.00$ 7,500.00 7,500.00$ 126 2-02 Removal of Structures and Obstructions 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 1,700.00 1,700.00$ 1,000.00 1,000.00$ 127 2-02 Removal of Curb and Gutter 40 LF 15.00 600.00$ 1.25 50.00$ 16.00 640.00$ 10.00 400.00$ 128 2-02 Removal of Cement Conc. Driveway 25 SY 15.00 375.00$ 1.25 31.25$ 48.00 1,200.00$ 30.00 750.00$ 129 2-02 Remove Flexible Pavement 70 SY 12.00 840.00$ 26.00 1,820.00$ 13.00 910.00$ 8.00 560.00$ 130 2-02 Removal of Sidewalk 10 SY 10.00 100.00$ 1.25 12.50$ 22.00 220.00$ 30.00 300.00$ 131 2-02 Removal of Cement Conc. Pavement 70 SY 20.00 1,400.00$ 37.00 2,590.00$ 26.00 1,820.00$ 20.00 1,400.00$ 132 2-09 Shoring or Extra Excavation Class B 675 SF 2.00 1,350.00$ 10.00 6,750.00$ 5.00 3,375.00$ 1.50 1,012.50$ 133 4-04 Crushed Surfacing Top Course 50 TON 30.00 1,500.00$ 17.00 850.00$ 16.00 800.00$ 30.00 1,500.00$ 134 4-04 Crushed Surfacing Base Course 95 TON 30.00 2,850.00$ 17.00 1,615.00$ 16.00 1,520.00$ 30.00 2,850.00$ 135 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)25 TON 110.00 2,750.00$ 170.00 4,250.00$ 180.00 4,500.00$ 200.00 5,000.00$ 136 5-04 HMA Cl. 1-inch PG 64-22 (Class E)35 TON 110.00 3,850.00$ 170.00 5,950.00$ 180.00 6,300.00$ 200.00 7,000.00$ 137 5-04 Planing Bituminous Pavement 215 SY 8.00 1,720.00$ 19.00 4,085.00$ 24.00 5,160.00$ 21.00 4,515.00$ 138 5-04 Asphalt Cold Patch 15 TON 110.00 1,650.00$ 116.00 1,740.00$ 150.00 2,250.00$ 130.00 1,950.00$ 139 7-05 Manhole, Type 1, 54 In. Diam.4 EA 5,500.00 22,000.00$ 5,670.00 22,680.00$ 7,000.00 28,000.00$ 7,500.00 30,000.00$ 140 7-08 Pipe Foundation Material 20 TON 40.00 800.00$ 27.00 540.00$ 130.00 2,600.00$ 60.00 1,200.00$ 141 7-08 CSTC for Select Trench Backfill and Pipe Bedding 110 TON 35.00 3,850.00$ 24.00 2,640.00$ 16.00 1,760.00$ 28.00 3,080.00$ 142 7-08 Removal of Contaminated Soils 1 Eq. Adj.20,000.00 20,000.00$ 20,000.00 20,000.00$ 20,000.00 20,000.00$ 20,000.00 20,000.00$ 143 7-17 Abandon Existing Sanitary Sewer (24 In.)143 LF 40.00 5,720.00$ 31.00 4,433.00$ 50.00 7,150.00$ 11.00 1,573.00$ 144 7-17 Solid Wall Polyvinyl Chloride (PVC) Sewer Pipe, SDR 21, 24 In. Diam.35 LF 150.00 5,250.00$ 222.00 7,770.00$ 580.00 20,300.00$ 412.00 14,420.00$ 145 7-17 High Density Polyethylene (HDPE) Sewer Pipe, DR 21, 28 In. Diam.7 LF 175.00 1,225.00$ 95.00 665.00$ 650.00 4,550.00$ 812.00 5,684.00$ 146 7-17 Sanitary Sewer Television Inspection 150 LF 4.00 600.00$ 11.00 1,650.00$ 1.00 150.00$ 5.00 750.00$ 147 7-17 Temporary Sewage Bypass System (3rd St. NW)1 LS 10,000.00 10,000.00$ 700.00 700.00$ 8,000.00 8,000.00$ 20,000.00 20,000.00$ 148 7-20 Auger Boring 36 In. Steel Casing with 28 In. Diam. HDPE Carrier Pipe 107 LF 1,000.00 107,000.00$ 1,030.00 110,210.00$ 985.00 105,395.00$ 1,497.00 160,179.00$ 149 7-20 Remove Steel Casing Obstructions 1 Eq. Adj.5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 5,000.00 5,000.00$ 150 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 151 8-01 TESC Plan Preparation 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 152 8-01 ESC Lead 60 Day 150.00 9,000.00$ 10.00 600.00$ 175.00 10,500.00$ 100.00 6,000.00$ 153 8-04 Cement Conc. Traffic Curb and Gutter 40 LF 30.00 1,200.00$ 27.00 1,080.00$ 43.00 1,720.00$ 45.00 1,800.00$ 154 8-05 Dewatering System – 3rd Street NW 1 Eq. Adj.13,000.00 13,000.00$ 13,000.00 13,000.00$ 13,000.00 13,000.00$ 13,000.00 13,000.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 12 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:C - Sanitary Sewer Utility Improvement Prepared By:City of Auburn Bid Date:41912 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 155 8-06 Industrial and Commercial Driveway Apron 25 SY 90.00 2,250.00 72.00 1,800.00$ 150.00 3,750.00$ 80.00 2,000.00$ 156 8-09 Raised Pavement Marker Type 2 4 EA 5.00 20.00 36.00 144.00$ 40.00 160.00$ 50.00 200.00$ 157 8-14 Cement Conc. Sidewalk 10 SY 65.00 650.00 56.00 560.00$ 130.00 1,300.00$ 150.00 1,500.00$ 158 8-22 Paint Line 80 LF 2.00 160.00 3.00 240.00$ 12.00 960.00$ 4.00 320.00$ 159 8-22 Plastic Stop Bar 12 LF 8.00 96.00 25.00 300.00$ 12.00 144.00$ 30.00 360.00$ Schedule Subtotal 309,606.00$ 267,755.75$ 359,534.00$ 423,283.50$ Applied Tax 29,412.57$ 25,436.80$ 34,155.73$ 40,211.93$ SCHEDULE TOTAL 339,018.57$ 293,192.55$ 393,689.73$ 463,495.43$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 13 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:C - Sanitary Sewer Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 115 1-04.4 Minor Changes 1 Eq. Adj. 10,000.00 10,000.00$ 116 1-07.15 SPCC Plan 1 LS 500.00 500.00$ 117 1-07.16 Property Restoration 1 LS 2,000.00 2,000.00$ 118 1-07.17 Utility Potholing 6 EA 100.00 600.00$ 119 1-09.7 Mobilization 1 LS 40,000.00 40,000.00$ 120 1-10.5 Traffic Control Supervisor 1 LS 5,000.00 5,000.00$ 121 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 122 1-10.5 Construction Signs Class A 100 SF 10.00 1,000.00$ 123 1-10.5 Portable Changeable Message Sign 20 Day 100.00 2,000.00$ 124 1-10.5 Labor 1 Eq. Adj.1,500.00 1,500.00$ 125 1-10.5 Other Temporary Traffic Control 1 LS 6,000.00 6,000.00$ 126 2-02 Removal of Structures and Obstructions 1 LS 6,000.00 6,000.00$ 127 2-02 Removal of Curb and Gutter 40 LF 1.00 40.00$ 128 2-02 Removal of Cement Conc. Driveway 25 SY 5.00 125.00$ 129 2-02 Remove Flexible Pavement 70 SY 15.00 1,050.00$ 130 2-02 Removal of Sidewalk 10 SY 10.00 100.00$ 131 2-02 Removal of Cement Conc. Pavement 70 SY 20.00 1,400.00$ 132 2-09 Shoring or Extra Excavation Class B 675 SF 1.00 675.00$ 133 4-04 Crushed Surfacing Top Course 50 TON 50.00 2,500.00$ 134 4-04 Crushed Surfacing Base Course 95 TON 40.00 3,800.00$ 135 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)25 TON 215.00 5,375.00$ 136 5-04 HMA Cl. 1-inch PG 64-22 (Class E)35 TON 215.00 7,525.00$ 137 5-04 Planing Bituminous Pavement 215 SY 20.00 4,300.00$ 138 5-04 Asphalt Cold Patch 15 TON 200.00 3,000.00$ 139 7-05 Manhole, Type 1, 54 In. Diam.4 EA 6,000.00 24,000.00$ 140 7-08 Pipe Foundation Material 20 TON 50.00 1,000.00$ 141 7-08 Bedding 110 TON 40.00 4,400.00$ 142 7-08 Removal of Contaminated Soils 1 Eq. Adj.20,000.00 20,000.00$ 143 7-17 Abandon Existing Sanitary Sewer (24 In.)143 LF 56.00 8,008.00$ 144 7-17 Solid Wall Polyvinyl Chloride (PVC) Sewer Pipe, SDR 21, 24 In. Diam.35 LF 600.00 21,000.00$ 145 7-17 High Density Polyethylene (HDPE) Sewer Pipe, DR 21, 28 In. Diam.7 LF 900.00 6,300.00$ 146 7-17 Sanitary Sewer Television Inspection 150 LF 10.00 1,500.00$ 147 7-17 NW)1 LS 15,000.00 15,000.00$ 148 7-20 Auger Boring 36 In. Steel Casing with 28 In. Diam. HDPE Carrier Pipe 107 LF 1,500.00 160,500.00$ 149 7-20 Remove Steel Casing Obstructions 1 Eq. Adj.5,000.00 5,000.00$ 150 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 151 8-01 TESC Plan Preparation 1 LS 500.00 500.00$ 152 8-01 ESC Lead 60 Day 100.00 6,000.00$ 153 8-04 Cement Conc. Traffic Curb and Gutter 40 LF 50.00 2,000.00$ 154 8-05 Dewatering System – 3rd Street NW 1 Eq. Adj.13,000.00 13,000.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 14 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:C - Sanitary Sewer Utility Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 155 8-06 Industrial and Commercial Driveway Apron 25 SY 60.00 1,500.00$ 156 8-09 Raised Pavement Marker Type 2 4 EA 35.00 140.00$ 157 8-14 Cement Conc. Sidewalk 10 SY 60.00 600.00$ 158 8-22 Paint Line 80 LF 3.00 240.00$ 159 8-22 Plastic Stop Bar 12 LF 10.00 120.00$ Schedule Subtotal 409,298.00$ Applied Tax 38,883.31$ SCHEDULE SUBTOTAL 448,181.31$ BID TABULATION SCHEDULE SUMMARY 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 15 Project Name: CP1308, BNSF Utility Crossings, 14-04 Schedule No.:C - Sanitary Sewer Utility Improvement Prepared by: City of Auburn Bid Date: ENGINEER'S ESTIMATE:309,606.00$ AVERAGE BID AMOUNT:364,967.81$ BID SPREAD AMOUNT:155,527.75$ BID Amount Spread $Spread % LOW BIDDER:Pacific Civil & Infrastructure 267,755.75$ (41,850.25)$ -13.52% Second Bidder:James W. Fowler Co.359,534.00$ 49,928.00$ 16.13% Basic BID (Tax not Included) Pacific Civil & Infrastructure 267,755.75$ James W. Fowler Co.359,534.00$ RW Scott Construction 423,283.50$ R.L. Alia Company 409,298.00$ 9/30/14 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 16 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:D - 37th & B Intersection Improvement Prepared By:City of Auburn Bid Date:9/30/14 Engineer's Estimate Pacific Civil & Infrastructure James W. Fowler Co.RW Scott Construction 3450 S. 344th Way, Ste. 115 PO Box 489 4005 West Valley Hwy N, Ste. A Federal Way, WA 98001 Dallas, OR 97228 Auburn, WA 98001 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 160 1-04.4 Minor Changes 1 Eq. Adj.15,000.00 15,000.00$ 15,000.00 15,000.00$ 15,000.00 15,000.00$ 15,000.00 15,000.00$ 161 1-07.15 SPCC Plan 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 162 1-07.16 Property Restoration 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 3,500.00 3,500.00$ 2,500.00 2,500.00$ 163 1-09.7 Mobilization 1 LS 32,000.00 32,000.00$ 10,000.00 10,000.00$ 37,000.00 37,000.00$ 54,801.00 54,801.00$ 164 1-10.5 Traffic Control Supervisor 1 LS 7,500.00 7,500.00$ 500.00 500.00$ 7,500.00 7,500.00$ 7,500.00 7,500.00$ 165 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 40.00 9,600.00$ 55.00 13,200.00$ 47.00 11,280.00$ 166 1-10.5 Portable Changeable Message Sign 20 Day 240.00 4,800.00$ 62.00 1,240.00$ 150.00 3,000.00$ 80.00 1,600.00$ 167 1-10.5 Outside Agency Uniformed Police Flagging Labor 1 Eq. Adj.1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 1,500.00 1,500.00$ 168 1-10.5 Other Temporary Traffic Control 1 LS 2,000.00 2,000.00$ 3,600.00 3,600.00$ 4,200.00 4,200.00$ 7,500.00 7,500.00$ 169 2-02 Removal of Curb and Gutter 180 LF 15.00 2,700.00$ 5.00 900.00$ 16.00 2,880.00$ 10.00 1,800.00$ 170 2-02 Removal of Sidewalk 140 SY 12.00 1,680.00$ 11.00 1,540.00$ 22.00 3,080.00$ 10.00 1,400.00$ 171 2-02 Remove Flexible Pavement 1670 SY 12.00 20,040.00$ 7.00 11,690.00$ 8.00 13,360.00$ 6.50 10,855.00$ 172 2-03 Roadway Excavation Including Haul 690 CY 35.00 24,150.00$ 17.38 11,992.20$ 50.00 34,500.00$ 25.00 17,250.00$ 173 4-02 Gravel Base 750 TON 30.00 22,500.00$ 27.00 20,250.00$ 37.00 27,750.00$ 20.00 15,000.00$ 174 4-04 Crushed Surfacing Top Course 100 TON 30.00 3,000.00$ 27.00 2,700.00$ 65.00 6,500.00$ 30.00 3,000.00$ 175 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)380 TON 110.00 41,800.00$ 89.00 33,820.00$ 110.00 41,800.00$ 105.00 39,900.00$ 176 5-04 HMA Cl. 1-inch PG 64-22 (Class E)580 TON 110.00 63,800.00$ 84.00 48,720.00$ 110.00 63,800.00$ 93.00 53,940.00$ 177 5-04 Asphalt Cold Patch 10 TON 110.00 1,100.00$ 116.00 1,160.00$ 150.00 1,500.00$ 130.00 1,300.00$ 178 7-05 Adjust Manhole 2 EA 500.00 1,000.00$ 600.00 1,200.00$ 600.00 1,200.00$ 750.00 1,500.00$ 179 7-05 Adjust Catch Basin 2 EA 500.00 1,000.00$ 370.00 740.00$ 600.00 1,200.00$ 500.00 1,000.00$ 180 7-05 ADA-Compliant Ring and Cover 2 EA 600.00 1,200.00$ 500.00 1,000.00$ 600.00 1,200.00$ 750.00 1,500.00$ 181 7-12 Adjust Valve Box 5 EA 250.00 1,250.00$ 500.00 2,500.00$ 300.00 1,500.00$ 400.00 2,000.00$ 182 8-02 Hydroseeding with Moderate-Term Mulch 250 SY 4.00 1,000.00$ 5.00 1,250.00$ 10.00 2,500.00$ 5.00 1,250.00$ 183 8-02 TESC Plan Preparation 1 LS 2,000.00 2,000.00$ 500.00 500.00$ 2,800.00 2,800.00$ 1,000.00 1,000.00$ 184 8-02 ESC Lead 10 Day 150.00 1,500.00$ 10.00 100.00$ 175.00 1,750.00$ 100.00 1,000.00$ 185 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 2,000.00 2,000.00$ 186 8-04 Cement Conc. Traffic Curb and Gutter 182 LF 30.00 5,460.00$ 28.00 5,096.00$ 43.00 7,826.00$ 35.00 6,370.00$ 187 8-09 Raised Pavement Marker Type 2 30 EA 5.00 150.00$ 36.00 1,080.00$ 40.00 1,200.00$ 40.00 1,200.00$ 188 8-13 Monument Type B (Modified)1 EA 850.00 850.00$ 500.00 500.00$ 525.00 525.00$ 400.00 400.00$ 189 8-14 Cement Conc. Sidewalk 34 SY 65.00 2,210.00$ 56.00 1,904.00$ 130.00 4,420.00$ 70.00 2,380.00$ 190 8-14 Cement Conc. Curb Ramp Type Parallel A 6 EA 1,500.00 9,000.00$ 1,800.00 10,800.00$ 2,000.00 12,000.00$ 1,400.00 8,400.00$ 191 8-20 Traffic Signal System Modifications 1 LS 45,000.00 45,000.00$ 42,000.00 42,000.00$ 40,000.00 40,000.00$ 48,000.00 48,000.00$ 192 8-22 Plastic Traffic Arrow 3 EA 110.00 330.00$ 100.00 300.00$ 400.00 1,200.00$ 400.00 1,200.00$ 193 8-22 Paint Line 250 LF 2.00 500.00$ 2.00 500.00$ 12.00 3,000.00$ 3.00 750.00$ 194 8-22 Plastic Crosswalk Stripe and Stop Bar (24 inch wide)240 LF 8.00 1,920.00$ 9.00 2,160.00$ 12.00 2,880.00$ 10.00 2,400.00$ 195 8-22 Plastic Traffic Letter 12 EA 50.00 600.00$ 97.00 1,164.00$ 175.00 2,100.00$ 105.00 1,260.00$ 196 8-22 Plastic Wide Line 140 LF 3.00 420.00$ 5.00 700.00$ 8.00 1,120.00$ 6.00 840.00$ Schedule Subtotal 336,960.00$ 250,706.20$ 373,291.00$ 331,576.00$ No Tax Applicable SCHEDULE TOTAL 336,960.00$ 250,706.20$ 373,291.00$ 331,576.00$ 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 17 Bid Tabulation:CP1308, BNSF Utility Crossings, 14-04 Schedule:D - 37th & B Intersection Improvement Prepared By:City of Auburn Bid Date:9/30/14 R.L. Alia Company 107 Williams Ave South Renton, WA 98057 Item No.Sec. No.Item Description Qty.Unit Unit Price Total Price 160 1-04.4 Minor Changes 1 Eq. Adj.15,000.00 15,000.00$ 161 1-07.15 SPCC Plan 1 LS 500.00 500.00$ 162 1-07.16 Property Restoration 1 LS 2,000.00 2,000.00$ 163 1-09.7 Mobilization 1 LS 25,000.00 25,000.00$ 164 1-10.5 Traffic Control Supervisor 1 LS 5,000.00 5,000.00$ 165 1-10.5 Traffic Control Labor (Min. Bid $38 per hour)240 HR 50.00 12,000.00$ 166 1-10.5 Portable Changeable Message Sign 20 Day 100.00 2,000.00$ 167 1-10.5 Outside Agency Uniformed Police Flagging Labor 1 Eq. Adj.1,500.00 1,500.00$ 168 1-10.5 Other Temporary Traffic Control 1 LS 7,000.00 7,000.00$ 169 2-02 Removal of Curb and Gutter 180 LF 2.00 360.00$ 170 2-02 Removal of Sidewalk 140 SY 10.00 1,400.00$ 171 2-02 Remove Flexible Pavement 1670 SY 10.00 16,700.00$ 172 2-03 Roadway Excavation Including Haul 690 CY 20.00 13,800.00$ 173 4-02 Gravel Base 750 TON 25.00 18,750.00$ 174 4-04 Crushed Surfacing Top Course 100 TON 50.00 5,000.00$ 175 5-04 HMA Cl. 1/2-inch PG 64-22 (Class B)380 TON 125.00 47,500.00$ 176 5-04 HMA Cl. 1-inch PG 64-22 (Class E)580 TON 120.00 69,600.00$ 177 5-04 Asphalt Cold Patch 10 TON 200.00 2,000.00$ 178 7-05 Adjust Manhole 2 EA 200.00 400.00$ 179 7-05 Adjust Catch Basin 2 EA 200.00 400.00$ 180 7-05 ADA-Compliant Ring and Cover 2 EA 500.00 1,000.00$ 181 7-12 Adjust Valve Box 5 EA 200.00 1,000.00$ 182 8-02 Hydroseeding with Moderate-Term Mulch 250 SY 5.00 1,250.00$ 183 8-02 TESC Plan Preparation 1 LS 500.00 500.00$ 184 8-02 ESC Lead 10 Day 100.00 1,000.00$ 185 8-02 Temporary Water Pollution/Erosion Control 1 Eq. Adj.2,000.00 2,000.00$ 186 8-04 Cement Conc. Traffic Curb and Gutter 182 LF 30.00 5,460.00$ 187 8-09 Raised Pavement Marker Type 2 30 EA 35.00 1,050.00$ 188 8-13 Monument Type B (Modified)1 EA 600.00 600.00$ 189 8-14 Cement Conc. Sidewalk 34 SY 50.00 1,700.00$ 190 8-14 Cement Conc. Curb Ramp Type Parallel A 6 EA 2,000.00 12,000.00$ 191 8-20 Traffic Signal System Modifications 1 LS 40,000.00 40,000.00$ 192 8-22 Plastic Traffic Arrow 3 EA 350.00 1,050.00$ 193 8-22 Paint Line 250 LF 4.00 1,000.00$ 194 8-22 Plastic Crosswalk Stripe and Stop Bar (24 inch wide)240 LF 10.00 2,400.00$ 195 8-22 Plastic Traffic Letter 12 EA 100.00 1,200.00$ 196 8-22 Plastic Wide Line 140 LF 5.00 700.00$ Schedule Subtotal 319,820.00$ No Tax Applicable SCHEDULE TOTAL 319,820.00$ BID TABULATION SCHEDULE SUMMARY 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 18 Project Name: CP1308, BNSF Utility Crossings, 14-04 Schedule No.:D - 37th & B Intersection Improvement Prepared by:City of Auburn Bid Date:9/30/14 ENGINEER'S ESTIMATE:336,960.00$ AVERAGE BID AMOUNT:318,848.30$ BID SPREAD AMOUNT:122,584.80$ BID Amount Spread $Spread % LOW BIDDER:Pacific Civil & Infrastructure 250,706.20$ (86,253.80)$ -25.60% Second Bidder:R.L. Alia Company 319,820.00$ (17,140.00)$ -5.09% Basic BID (Tax not Included) Pacific Civil & Infrastructure 250,706.20$ James W. Fowler Co.373,291.00$ RW Scott Construction 331,576.00$ R.L. Alia Company 319,820.00$ BID TABULATION BID TOTALS SUMMARY 10/2/2014 (12:00 PM) h:\proj\bidtabs\CP1308 BT.xls 19 Project Name: CP1308, BNSF Utility Crossings, 14-04 Prepared by: City of Auburn Bid Date: ENGINEER'S ESTIMATE:1,515,848.00$ AVERAGE BASIC BID AMOUNT:1,751,186.78$ BASIC BID SPREAD AMOUNT:513,993.39$ Basic BID Amount Spread $Spread % LOW BIDDER:Pacific Civil & Infrastructure 1,401,829.61$ -$114,018.39 -7.52% Second Bidder:James W. Fowler Co.1,820,424.00$ $304,576.00 20.09% Basic BID (Tax not Included)Total BID (Tax Included) Pacific Civil & Infrastructure 1,401,829.61$ 1,511,186.34$ James W. Fowler Co.1,820,424.00$ 1,957,901.64$ RW Scott Construction 1,866,670.50$ 2,012,504.48$ R.L. Alia Company 1,915,823.00$ 2,067,443.29$ 9/30/14