HomeMy WebLinkAbout2015 Capital Facilities Plan.pdfCity of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN (2015 – 2020) Adopted by Ordinance No. 6541, November 17, 2014 as part of the City of Auburn Comprehensive Plan City of Auburn 25 West Main Auburn, WA 98001 (253) 931-3000 www.auburnwa.gov Cover photo by Dan Streiffert Auburn Environmental Park City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 2015 – 2020 TABLE OF CONTENTS Executive Summary ................................................................................................................... 1 1. Introduction Purpose .................................................................................................................................. 7 Statutory Requirement for Capital Facilities Elements ............................................................ 7 Concurrency and Level of Service .......................................................................................... 8 Implementation ....................................................................................................................... 8 2. Goals and Policies 1. Capital Facilities Response to Growth .............................................................................. 11 2. Financial Feasibility .......................................................................................................... 11 3. Public Health and Environment ......................................................................................... 13 4. Consistency With Regional Planning ................................................................................ 13 3. Capital Improvements Introduction ............................................................................................................................ 15 Transportation ........................................................................................................................ 17 Arterial Street (102) Capital Projects ................................................................................. 22 Local Street (103) Capital Projects ................................................................................... 82 Street Preservation Fund (105) Capital Projects ............................................................... 84 Water...................................................................................................................................... 93 Sanitary Sewer ....................................................................................................................... 131 Storm Drainage ...................................................................................................................... 141 Solid Waste ............................................................................................................................ 169 Parks, Arts and Recreation ..................................................................................................... 171 General Municipal Buildings ................................................................................................... 197 Community Improvements ...................................................................................................... 207 Airport..................................................................................................................................... 225 Cemetery ................................................................................................................................ 241 Golf Course ............................................................................................................................ 243 Police Department .................................................................................................................. 245 Valley Regional Fire Authority ................................................................................................ 247 City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan 1 EXECUTIVE SUMMARY A capital facilities element is one of the comprehensive plan elements required by Washington’s Growth Management Act (GMA). Capital facilities generally have long useful lives, significant costs and tend to not be mobile. The GMA requires that capital facilities elements include an inventory of existing capital facilities showing locations and capacities, a forecast of future needs for such capital facilities, proposed locations and capacities of new or expanded capital facilities and at least a six-year plan to finance capital facilities with identified sources of funding. The GMA also requires that the land use element be reassessed if probable funding falls short of existing needs. This document is the City’s six-year Capital Facilities Plan (CFP). The CFP, in conjunction with other City adopted documents, satisfies the GMA requirement for a Capital Facilities Element. It addresses one of the GMA’s basic tenets: to provide adequate facilities to support development in accordance with locally adopted level of service standards. This CFP will enable the City to: (1) make informed decisions about its investment of public dollars, and (2) make timely decisions about maintaining level of service in accordance with this CFP and other adopted plans. CAPITAL FACILITIES PLAN CONTENT This CFP consists of the following: Chapter 1. Introduction Purpose of CFP, statutory requirements, methodology. Chapter 2. Goals and Policies Goals and policies related to the provision of capital facilities. Chapter 3. Capital Improvements Proposed capital projects, which include the financing plan and reconciliation of project capacity to level of service (LOS) standards. This CFP is a companion document to the Capital Facilities Element of the Auburn Comprehensive Plan (Chapter 5). The Capital Facilities Element of the Auburn Comprehensive Plan identifies the City’s planning approach and policy framework for the provision of capital facilities. This CFP provides the background inventory, identifies proposed projects and establishes the six-year capital facilities plan for financing capital facilities. The comprehensive plan contains timeframes which are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these timeframes are estimates; depending on factors involved in the processing of applications and project work, and the availability of funding, the timing may change from the included timeframes. The framework does not represent actual commitments by the City of Auburn that may depend on funding resources available. City of Auburn Capital Facilities Plan 2 GROWTH ASSUMPTIONS In planning for capital facilities, contemplation of future growth needs to be considered. The CFP is based on the following City population forecast: Year Population 2013 73,235 2014 74,630 2020 85,288 The population forecasts are based on information from the State of Washington Office of Financial Management (OFM) as well as estimates developed by the City of Auburn Planning and Community Development Department. CAPITAL COSTS OF FACILITIES Based on the analysis of capital improvements contained in this document, the cost of City- owned and managed capital improvements for 2015-2020 is summarized as follows: Type of Facility 2015 - 2020 Transportation - Arterial (102)102,923,867$ Transportation - Local (103)10,600,000 Transportation - Street (105)16,347,850 Water 30,832,065 Sanitary Sewer 11,345,160 Storm Drainage 14,710,042 Parks, Arts & Recreation 24,205,000 General Municipal Buildings 5,537,223 Community Improvements 5,323,161 Airport 3,893,170 Total 225,717,538$ City of Auburn Capital Facilities Plan 3 FINANCING FOR CAPITAL FACILITIES The financing plan for the citywide capital improvements includes: Funding Source 2015 - 2020 Capital Facility Grants 85,704,577 Transportation 5,580,000 Parks, Arts & Recreation 1,150,000 Community Improvements 259,887 Storm Drainage 3,188,362 Airport User Fees / Fund Balance 15,033,065 Water 11,845,160 Sewer 12,942,680 Storm Drainage 379,620 Community Improvements 1,270,000 Equipment Rental 704,808 Airport Arterial Street Fund 3,426,000 Transportation Local Street Fund 850,000 Transportation Arterial Street Preservation Fund 632,420 Transportation Bond Proceeds 15,999,000 Water 1,482,392 Storm Drainage 6,000,000 Parks, Arts & Recreation Municipal Parks Fund 400,000 Parks, Arts & Recreation Property Tax 775,000 Parks, Arts & Recreation Sales Tax 8,850,000 Transportation Utility Tax 10,932,850 Transportation Mitigation/Impact Fees 15,200,870 Transportation 900,000 Parks, Arts & Recreation 201,568 Community Improvements REET 1 1,059,219 Parks, Arts & Recreation 3,967,223 General Municipal Buildings REET 2 3,341,973 Community Improvements Other Sources 3,375,000 Transportation 525,083 Storm Drainage 250,000 Community Improvements 9,490,781 Parks, Arts & Recreation Total 225,717,538$ (Includes grant funding that has not been secured) City of Auburn Capital Facilities Plan 4 SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS The forecasted impacts of new capital facilities on the City’s future operating budgets (2015-2020) are as follows: Budget Year:2016 2017 2018 2019 2020 2021 Total 1 Transportation 100,807$ 103,307$ 107,407$ 121,007$ 182,607$ 235,957$ 851,092$ 2 Water 2,400 2,400 2,400 3,000 3,000 3,000 16,200 3 Sanitary Sewer - - - - - - - 4 Storm Drainage - - - - - - - 5 Solid Waste - - - - - - - 6 Parks, Arts and Recreation - 171,000 171,000 183,000 183,000 183,000 891,000 7 General Municipal Buildings - - - - - - - 8 Community Improvements 500 500 10,500 10,500 10,500 10,500 43,000 9 Airport - - - - - - - 10 Cemetery - - - - - - - 11 Golf Course - - - - - - - 12 Senior Center - - - - - - - 13 Police Department - - - - - - - 14 Fire Protection - - - - - - - Total 103,707$ 277,207$ 291,307$ 317,507$ 379,107$ 432,457$ 1,801,292$ Project summary details are located on the following pages: Transportation page 91 Water page 129 Parks & Recreation page 194 Community Improvements page 223 City of Auburn Capital Facilities Plan 5 LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP Based on the proposed six-year capital projects and the projected population increase of 10,658 (14.3%) between 2014 and 2020, the LOS for the following City-owned public facilities will change as follows: The LOS for the following facilities will be increased as a result of the CFP, comparing the 2014 LOS to the projected 20120 LOS. CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS (Projected) Cemetery Burial Plots per 1,000 Pop.30.03 40.80 Community Parks Acres per 1,000 Pop.3.16 3.46 The LOS for the following facilities will be maintained as a result of the CFP. CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS (Projected) Roads Volume/Capacity Ratio "D""D" Airport % Air Operations Support 100%100% Sanitary Sewer Residential GPCPD (Note 1)171.00 171.00 Storm Drainage N/A Water Residential GPCPD (Note 1)230.00 230.00 Note 1: GPCPD = Gallons per Customer per Day The LOS for the following facilities will be decreased as a result of the CFP, comparing the 2014 LOS to the projected 2020 LOS. CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS (Projected) Fire Protection Apparatus per 1,000 Pop.0.21 0.20 General Municipal Buildings Sq. Ft. per 1,000 Pop.3,503.07 3,130.98 Golf Course Acres per 1,000 Pop.0.24 0.21 Linear Parks Acres per 1,000 Pop.0.44 0.38 Neighborhood Parks Acres per 1,000 Pop.0.86 0.86 Open Space Acres per 1,000 Pop.4.66 4.08 Senior Center Sq. Ft. per 1,000 Pop.168.83 147.73 Special Use Areas Acres per 1,000 Pop.0.73 0.64 Level of Service (LOS) is a common measure used to determine the efficiency or effectiveness of services. For the City of Auburn, LOS targets serves as a means to assess the adequacy of public facilities in meeting the needs of the population for which it serves. City of Auburn Capital Facilities Plan 6 For example, in the case of park space, when there is an increase in population without a corresponding increase in park acreage, the LOS unit of measure (acres per 1,000 population) will decline, indicating a potential need to increase the total amount of park acreage to keep pace with population growth. On the other hand, a slight increase in population, coupled with a large increase in facilities, will result in an increased LOS. For example, facilities such as buildings or burial plots may be constructed or expanded to keep pace with anticipated population growth. While this will have the effect of increasing LOS in the short-term, in the longer-term, the LOS will gradually decline to the targeted level based on forecasted population. The impact of population growth to the LOS for facilities will vary depending on the type of facility and long range planning by the City. CFP ELEMENT SOURCE DOCUMENTS Documents used in preparing this Capital Facilities Plan (CFP) are principally the comprehensive plans for the various public facilities included in this CFP. These individual comprehensive plans provide detailed identification of projects and identify their (projects) proposed funding sources. City documents include: • City-wide Comprehensive Land Use Plan Element (2013); • City Municipal Airport Master Plan Update (2001-2020); • City Comprehensive Water Plan (2009); • City Comprehensive Transportation Plan (2012) and Six Year Transportation Improvement Program (2015-2020); • City Comprehensive Drainage Plan (2009); • City Comprehensive Sewer Plan (2009);  City 2015-16 Biennial Budget and 2013 Annual Financial Report; and, • Master plan update for parks, as well as numerous other planning and financial documents. All documents are available for public inspection at the City of Auburn. City of Auburn Capital Facilities Plan 7 CHAPTER 1 INTRODUCTION PURPOSE The Capital Facilities Plan (CFP) is a 6-year plan (2015-2020) for capital improvements that support the City of Auburn’s current and future growth. In this plan, funding for general government projects is identified. To maintain consistency with individual master and utility comprehensive plans, applicable projects in the 6-year window of those master/utility plans are included in this CFP. The CFP also identifies LOS standards, where applicable, for each public facility. STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS RCW 36.70A.070(3)(d) requires that the comprehensive plan capital facilities element include “a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes.” RCW 36.70A.070(3)(e) requires that all capital facilities have “probable funding” to pay for capital facility needs, or else the City must “reassess the land use element.” In addition, the capital facilities element must include the location and capacity of existing facilities, a forecast of future needs, and their proposed locations and capacities. The State Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation facilities, police and fire protection facilities. The GMA also seeks the selection of level of service standards for capital facilities. As a result, public facilities in the CFP should be based on quantifiable, objective measures of capacity such as traffic volume, capacity per mile of road and acres of park per capita. In some instances, though, level of service may best be expressed in terms of qualitative statements of satisfaction with a particular public facility. Factors that influence local level of service standards include, but are not limited to, community goals, national and local standards, and Federal and State mandates. To be effective, the CFP must be updated on a regular basis. State GMA guidelines suggest that the CFP be updated at least every two years. In 2007, the City transitioned to a biennial budget. With this in mind, the City will follow these guidelines and update the CFP at least every two years, incorporating the capital facilities improvements in the City’s biennial budget process. City of Auburn Capital Facilities Plan 8 CONCURRENCY AND LEVEL OF SERVICE Concurrency The GMA requires that jurisdictions have certain capital facilities in place or available within a specified time frame when development occurs. This concept is called concurrency. Under the GMA, concurrency is required for transportation facilities and is recommended by the State for certain other public facilities, namely potable water and sanitary sewer. Concurrency has a direct relationship to level of service. The importance of concurrency to capital facilities planning is that development may be denied if it reduces the level of service for a capital facility below the locally adopted minimum. The level of service is unique for each type of facility and is presented in the subsequent sections. Explanation of Level of Service As indicated earlier, the GMA requires that level of service be established for certain transportation facilities for the purposes of applying concurrency to development proposals. The State GMA guidelines recommend the adoption of level of service standards for other capital facilities to measure the provision of adequate public facilities. Typically, measures of level of service are expressed as ratios of facility capacity to demand (i.e., actual or potential users). Table 1-1 lists generic examples of level of service measures for some capital facilities: TABLE 1-1 Sample Level of Service Measurements The need for capital facilities is largely determined by a community’s adopted LOS standards and whether or not the community has formally designated capital facilities, other than transportation, as necessary for development to meet the concurrency test. The CFP itself is therefore largely influenced by the selection of the level of service standards. Level of service standards are measures of the quality of life in the City. The standards should be based on the City’s vision of its future and its values. IMPLEMENTATION Implementation of the CFP requires constant monitoring and evaluation. The CFP is sensitive to funding and revenue availability and therefore needs to be constantly monitored against variations in available resources. To facilitate its implementation, the CFP should be kept current. Type of Facility Sample Level of Service Measure General Municipal Buildings Square feet per 1,000 population Parks Acres per 1,000 population Roads and Streets Ratio of actual volume to design capacity Sewer / Water Gallons per customer per day City of Auburn Capital Facilities Plan 9 Update of Capital Facilities Plan Perhaps the most desirable way to keep the CFP current is to update it regularly so the six- year plan is a rolling CFP. Again, the State recommends that the CFP be updated at least biennially. The City of Auburn will seek to update the CFP at least biennially in conjunction with the budget process. Future updates will consider: A. Revision of population projections, including annexations; B. Update of inventory of public facilities; C. Update of costs of public facilities; D. Update of public facilities requirements analysis (actual level of service compared to adopted standards); E. Update of revenue forecasts; F. Revise and develop capital improvement projects for the next six fiscal years; and, G. Update analysis of financial capacity. Amendments to the CFP, including amendments to level of service standards, capital projects, and/or the financing plan sources of revenue are all actions that can keep the CFP current and relevant to City decision-making. City of Auburn Capital Facilities Plan 10 City of Auburn Capital Facilities Plan 11 CHAPTER 2 GOALS AND POLICIES This chapter identifies goals and policies specific to the City’s provision of capital facilities. Goal 1 Provide a variety of responses to the demands of growth on public facilities. Policy 1.1 Establish land use patterns that optimize the use of public facilities. Policy 1.2 Provide additional public facility capacity when existing facilities are used to their maximum level of efficiency (consistent with adopted standards for level of service). Policy 1.3 Encourage development where new public facilities can be provided in an efficient manner. Policy 1.4 Exempt the following from the concurrency management program: 1.4.1 Development vested by RCW 19.27.095, 58.17.033 or 58.17.170. 1.4.2 Development that creates no added impact on public facilities. 1.4.3 Expansions of existing development that were disclosed and tested for concurrency as part of the original application. Goal 2 Provide needed public facilities that are within the ability of the City to fund or within the City’s authority to require others to provide. Policy 2.1 Establish level of service standards that are achievable with the financing plan of this Capital Facilities Plan. Policy 2.2 Base the financing plan for public facilities on realistic estimates of current local revenues and external revenues that are reasonably anticipated to be received by the City. Policy 2.3 Match revenue sources to capital projects on the basis of sound fiscal policies. 2.3.1 The City shall continue to fund utility costs through utility enterprise funds, based on user fees and grants. Public facilities included in utilities are sewer, solid waste, storm drainage, and water. 2.3.2 Where feasible pursue joint venture facility construction, construction timing, and other facility coordination measures for City provided facilities, as well as with school districts and other potential partners in developing public facilities. 2.3.3 The City shall continue to assist through direct participation, LIDs and payback agreements, where appropriate and financially feasible. Where funding is available, the City may participate in developer initiated facility extensions or improvements, but only to the extent that the improvements benefit the broader public interest, and are consistent with the policies of this Capital Facilities Plan. City of Auburn Capital Facilities Plan 12 Policy 2.4 If the projected funding is inadequate to finance needed public facilities and utilities based on adopted level of service standards and forecasted growth, the City will do one or more of the following to achieve a balance between available revenue and needed public facilities: 2.4.1 Lower the level of service standards; 2.4.2 Increase the amount of revenue from existing sources; 2.4.3 Adopt new sources of revenue; 2.4.4 Require developers to provide such facilities at their own expense; and/or 2.4.5 Amend the Land Use Element to reduce the need for additional public facilities. Policy 2.5 Both existing and future development will pay for the costs of needed capital improvements. 2.5.1 Ensure that existing development pays for capital improvements that reduce or eliminate existing deficiencies, and pays for some or all of the cost to replace obsolete or worn out facilities. Existing development may also pay a portion of the cost of capital improvements needed by future development. Existing development’s payments may take the form of user fees, charges for services, special assessments and taxes. 2.5.2 Ensure that future development pays a proportionate share of the cost of new facilities which it requires. Future development may also pay a portion of the cost to replace obsolete or worn-out facilities. Future development’s payments may take the form of voluntary contributions for the benefit of any public facility, impact fees, mitigation payments, capacity fees, dedications of land, provision of public facilities, and future payments of user’s fees, charges for services, special assessments and taxes. Policy 2.6 The City will determine the priority of public facility capital improvements using the following criteria as general guidelines. Any revenue source that cannot be used for the highest priority will be used beginning with the highest priority for which the revenue can legally be expended. 2.6.1 Projects that eliminate hazardous conditions. 2.6.2 Refurbishment of existing facilities that contribute to achieving or maintaining standards for adopted level of service. 2.6.3 New or expanded facilities that reduce or eliminate deficiencies in level of service for existing demand. 2.6.4 New or expanded facilities that provide the adopted level of service for new development and redevelopment during the next six fiscal years. 2.6.5 Capital improvements that significantly reduce the operating cost of providing a service or facility, or otherwise mitigate impacts of public facilities on future operating budgets. City of Auburn Capital Facilities Plan 13 2.6.6 Capital improvements that contribute to stabilizing and developing the economy of the City. 2.6.7 Project priorities may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility are financially feasible prior to constructing the facility. Goal 3 Protect public health, environmental quality, and neighborhood stability and viability through the appropriate design and installation of public facilities. Policy 3.1 Promote conservation of energy, water and other natural resources in the location and design of public facilities. Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever combined sewers may be discovered. Policy 3.3 Practice efficient and environmentally responsible maintenance and operating procedures. Policy 3.4 The siting, design, construction and improvement of all public buildings shall be done in full compliance with the Americans with Disabilities Act (ADA). Policy 3.5 Promote economic and community stability and growth through strategic investments in public facilities and public private/partnerships. Goal 4 Make the Capital Facilities Plan consistent with other elements of the comprehensive plan, and - to the extent feasible - with other city, county, regional and state adopted plans. Policy 4.1 Ensure that the growth and development assumptions used in the Capital Facilities Plan are consistent with similar assumptions in other elements of the comprehensive plan. Policy 4.2 Coordinate with non-city providers of public facilities on a joint program for maintaining applicable level of service standards, concurrency requirements, funding and construction of public facilities. Goal 5 Provide public facilities that provide a sense of community that is inclusive of diverse populations. Policy 5.1 Contribute to community pride and foster a sense of community through provision of public facilities that create a community gathering place for neighbors, family and friends. Policy 5.2 Through provision of public facilities offer a broad range of activities promoting social interactions especially with new residents. Policy 5.3 Provide maximum flexibility and multiple uses through design of public facilities that are adaptable to changing interests. Policy 5.4 Provide a community center facility that is financially feasible, affordable for participants, and can generate revenue to offset a portion of the operating costs. City of Auburn Capital Facilities Plan 14 City of Auburn Capital Facilities Plan 15 CHAPTER 3 CAPITAL IMPROVEMENTS 1. INTRODUCTION This CFP includes City capital improvement projects and the financing plan to pay for those projects. It also contains the inventory of existing City facilities, and identifies level of service standards, where applicable. Each type of City public facility is presented in a separate subsection that follows a standard format. Throughout this section, tables of data are identified with abbreviations that correspond to the type of facility. For example, Table W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds to the name of the type of facility. 1. Narrative Summary This is an overview of the data, with sections devoted to Current Facilities, Level of Service, Capital Facilities Projects and Financing, and Impact on Future Operating Budgets. 2. Inventory of Facilities (Table X-1) This is a list of existing capital facilities, including the name, capacity (for reference to level of service), and location. This table also includes any proposed capital projects and the planned inventory total through December 31, 2020. 3. Capital Projects and Financing Plan (Table X-2, X-2A and X-2B) This is a list of capital improvements that identifies existing deficiencies, identifies facilities needed for future growth, and identifies the need to repair or replace obsolete or worn out facilities through December 31, 2020. Each list shows the proposed financing plan followed by individual worksheets showing the project detail. 4. Impact on Future Operating Budgets (Table X-3) This is a list of new capital projects and the forecasted impacts on the City’s future operating budgets (2016 – 2021). City of Auburn Capital Facilities Plan 16 City of Auburn Capital Facilities Plan 17 TRANSPORTATION Current Facilities Roadways: The City’s street system consists of a network of 216 miles of arterials, collectors, local streets and alleys. Existing non-motorized facilities include a mix of sidewalks, bicycle lanes and sharrows. Transit: King County Metro Transit, Sound Transit and Pierce Transit serve the Auburn area. Auburn is currently served by eight Metro bus routes, two Sound Transit bus routes, and one Pierce Transit bus route. Twenty Sound Transit “Sounder” commuter rail trains stop at Auburn each weekday at the Auburn station located at 23 A Street SW. The Sounder also provides special event service to selected sporting events. Bus and rail service is supported by park and ride facilities and the Auburn Transit Center. Level of Service (LOS) Washington's Growth Management Act (GMA) requires Level of Service (LOS) standards for both arterials and transit routes. The GMA requires that each jurisdiction's LOS standards be coordinated within the region and be supported by local ordinance, but the actual standards and the methods used are determined by each local jurisdiction. Under GMA, the focus is on the performance of the whole road system, not on individual intersections or roadways. LOS standards are a tool to help keep the transportation system in balance with the needs of forecast population growth and development. Table T-1a summarizes the LOS definitions. City of Auburn Capital Facilities Plan 18 Table T-1a Definition of Urban Street Level of Service (LOS) LOS A - describes primarily free flow operations at average travel speeds, usually about 90 percent of the free flow speed for the given street class. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Control delay at signalized intersections is minimal. LOS B - describes reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free flow speed for the street class. The ability to maneuver within the traffic stream is only slightly restricted, and stopped delays are not bothersome. LOS C - describes stable conditions; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the free flow speed for the street class. LOS D - borders on a range in which small increases in flow may cause substantial increases in delay and decreases in travel speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these factors. Average travel speeds are about 40 percent of free flow speed. LOS E - is characterized by significant delays and average travel speeds of 33 percent or less of the free flow speed. Such operations are caused by a combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. LOS F - is characterized by urban street flow at extremely low speeds, typically one-third to one-fourth of the free flow speed. Intersection congestion is likely at critical signalized locations, with high delays, high volumes and extensive queuing. Source: 2010 Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington, D.C. 2000, page 10-5 A methodology and set of standards have been drafted for the City of Auburn Comprehensive Plan. The standards help determine concurrency (i.e., balance) between transportation and land use elements of the City’s Comprehensive Plan, as required by the GMA. The City has four choices if it finds the standards cannot be met.  Modify the land use plan, placing tighter controls on the amount and type of development to reduce traffic.  Construct additional transportation facilities to support increased travel demand from new development.  Implement Transportation Demand Management (TDM) measures to increase use of non single occupant vehicle travel modes.  Relax the LOS standards; the City can accept lower level of service standards to encourage further growth and minimize the need for additional transportation facilities. The transportation land-use balance will be monitored through the City's Concurrency Management System as part of the State Environmental Policy Act (SEPA). Transportation concurrency will be evaluated for key facilities and on a system-wide basis. By having system- wide and facility-based roadway LOS standards, the City of Auburn can define preliminary capacity needs. The City can then identify locations where standards are not anticipated to be met in the future and identify appropriate improvements. At the project level, the State Environmental Policy Act (SEPA) process will continue to guide the more specific planning and analysis efforts. City of Auburn Capital Facilities Plan 19 Level of Service Standards LOS standards can help identify where and when transportation improvements are needed, and when development or growth will impact system operations. LOS provides a standard below which a transportation facility or system is not considered adequate. LOS standards can also be used to evaluate the impact of proposed developments to the surrounding street system. They can assure that all developments are served by a safe, efficient and cost-effective street system. They can also be used to disclose impacts, identify remedial actions, and apportion costs between public and private sources. The LOS standards shown in Table T-1b apply to the facility’s location and its functional classification. A more detailed description of the level of service methodology is provided in the City of Auburn Comprehensive Transportation Plan (2012), page 5-4. Table T- 1b Draft Roadway Capacity/Congestion LOS Standards Roadway/Intersection Maximum V/C Ratio/LOS Arterial Corridor D* Signalized Intersection D Unsignalized Intersection D *Unless otherwise specified in Chapter 2 of the City of Auburn Comprehensive Transportation Plan, 2012 LOS standards are also the basis of an equitable traffic impact fee system, which require developments to pay a portion of the costs for capacity improvements to the transportation infrastructure. In 2001, the City implemented a traffic impact fee program. The purpose of the fee is to mitigate traffic impacts more equitably while making the costs of development more predictable to developers. In 2007, the City implemented an additional transportation impact fee to address the impacts of heavy truck usage on the City’s transportation system. Both fees are regularly updated to enable the City to construct road capacity to meet the traffic demand of development. Measuring Transportation System Performance The level of service for street segments or links is analyzed with two primary purposes in mind. First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate areas of congestion within a transportation network, leading to the development of a long-range transportation facilities plan. Second, arterial corridor LOS analysis can be used to assess concurrency or if facilities are meeting the LOS standards. The City of Auburn currently uses Highway Capacity Manual methodologies to calculate levels of service. For arterials LOS are based on average travel speeds along a defined corridor. Table T-1c shows the 42 defined street corridors, LOS standards and most recent calculated LOS. City of Auburn Capital Facilities Plan 20 TABLE T- 1c Auburn Corridor Level of Service ID Corridor From To LOS Standard LOS 2009 1 Auburn Way North 15th St NE Northern City Limits D C/D 2 Auburn Way North East Main St. 15th St NE E D 3 Auburn Way South East Main St.M St SE D F/E 4 Auburn Way South M St SE Eastern City Limits D C 5 M St./Harvey Auburn Way North East Main St.E C 6 M St./Harvey East Main St Auburn Way South D D/C 7 Evergreen Way Lakeland Hills Way Kersey Way D Future 8 37th St NE/NW West Valley Hwy I St. NE D B/C 9 15th St NE/NW West Valley Hwy Auburn Way North F**D 10 Auburn Ave / "A" St SR 18 Southern City Limits D B 11 Main St West Valley Hwy R St D C 12 15th St SW West Valley Hwy C St SW D D 13 C St SW Ellingson SR 18 D C/E 14 West Valley Hwy Northern City Limits 15th Street NW E B/C 15 S 277th St Frontage Rd.108th Ave SE E E/B 16 R St./Kersey Way Auburn Way S.Oravetz Road D A/B 17 Lake Tapps Parkway East Valley Hwy.182nd Ave E D B 18 "A" St SW/NW/ "B" St NW 4th St NW S 277th St D Future 19 8th St NE/Lea Hill Rd.Auburn Way North 132nd Ave SE E C/B 20 D St NW/Emerald Downs Dr S 277th St 15th St. NW D A/B 21 I St NE S 277th St Harvey Rd D A/B 22 132nd Ave SE SE 282nd St SE 312th St D B 23 124th Ave SE SE 282nd St SE 320th. St D C 24 104th Ave SE/SE 304th St 8th St NE 132nd Ave SE D B/A 25 105th Pl SE/SE 320th St Lea Hill Road 124th Ave SE D B 26 Lakeland Hills Way SE Lake Tapps Parkway Oravetz Rd D C/D 27 29th St SE/Riverwalk Dr.A Street SE Auburn Way South D C 28 108th Ave SE/112th Ave. SE S 277th St SE 304th St D A 29 49th St NW B St NW S 277th St D Future 30 R Street SE 8th St NE 4th Street SE D B/C 31 3rd St SW/Cross St C Street Auburn Way South E E 32 17th St SE A St SE Auburn Way South D B/A 33 41st St SE/Ellingson Rd A St SE Western City Limits E F 34 Lakeland Hills Way/Oravetz East Valley Hwy Kersey Way E A/B 35 West Valley Hwy 15th Street NW Southern City Limits E C/B 36 Kersey Way Oravetz Road Southern City Limits D A 37 S. 316th Street/Terrace Drive West Valley Highway Western City Limits D B 38 S. 296th Street/65th Ave West Valley Highway Western City Limits D B 39 51st Ave S.S. 288th Street Peasley Canyon Rd D B 40 S. 284th Street 112th Ave SE 124th Ave SE D B/A 41 S. 284th Street 124th Ave SE 132nd Ave SE D Future 42 R St. Bypass/Black Diamond M Street SE SR 18 D Future * **Total travel time in the eastbound direction cannot exceed 1000 seconds for this corridor to meet the LOS Standard. Split LOS indicates directional LOS in either the East-West or North-South direction. Otherwise, the LOS is the same in both directions. City of Auburn Capital Facilities Plan 21 Concurrency (Adequate Public Facilities) Concurrency involves matching public facilities and new development. The GMA extends concurrency to transportation facilities by requiring that new development be served by adequate roads and public transportation service, and that development is not permitted to cause these transportation facilities to operate below level of service standards that are adopted by local governments in their comprehensive plans. In compliance with the GMA, adequate transportation system facilities must be available within six years of the time of occupancy and use of new development. Capital Facilities Projects and Financing The City’s transportation facilities include projects totaling $129,871,717. Tables T-2, T-2A and T-2B show the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table T-3 shows, operating budget impacts of $851,092 are forecasted for transportation facilities during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 22 TABLE T- 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – ARTERIAL STREET 2015 2016 2017 2018 2019 2020 Total TIP#Capacity Projects: 1 A Street NW, Phase 1 Capital Costs 350,000 25,000 25,000 25,000 25,000 25,000 475,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 350,000 25,000 25,000 25,000 25,000 25,000 475,000 Other - - - - - - - 2 AWS Pedestrian Imp. -Dogwood St SE to Fir St SE Capital Costs 115,000 - - - - - 115,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Impact Fees 115,000 - - - - - 115,000 Other - - - - - - - 5 M Street Underpass Capital Costs - - - - - - - Long-Term Debt 131,233 130,654 130,080 129,500 128,920 128,350 778,737 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 131,233 130,654 130,080 129,500 128,920 128,350 778,737 PWTF Loan - - - - - - - Other (Other Agencies)- - - - - - - 6 S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements Capital Costs 5,581,800 - - - - - 5,581,800 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 4,000,000 - - - - - 4,000,000 Traffic Impact Fees 581,800 - - - - - 581,800 Other (Development Funds)1,000,000 - - - - - 1,000,000 10 F Street SE, 4th to AWS Capital Costs 400,000 250,000 1,800,000 - - - 2,450,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 320,000 200,000 1,440,000 - - - 1,960,000 Traffic Impact Fees 80,000 50,000 360,000 - - - 490,000 11 M Street NE, E. Main to 4th Capital Costs 100,000 - 275,000 1,150,000 - - 1,525,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 220,000 920,000 - - 1,140,000 Traffic Impact Fees 100,000 - 55,000 230,000 - - 385,000 14 M St SE and 12th St SE Traffic Signal Capital Costs - - - 625,000 - - 625,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 500,000 - - 500,000 Traffic Impact Fees - - - - - - - Other - - - 125,000 - - 125,000 15 8th Street NE Widening (Pike Street to R Street NE) Capital Costs - - 450,000 1,000,000 - - 1,450,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 360,000 800,000 - - 1,160,000 REET 2 - - - - - - - Traffic Impact Fees - - 90,000 200,000 - - 290,000 City of Auburn Capital Facilities Plan 23 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Capacity Projects: 17 Harvey Road & 8th Street NE Intersection Improvements Long-Term Debt 86,010 85,383 85,200 84,800 84,400 84,400 510,193 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - PWTF - - - - - - - Traffic Impact Fees 86,010 85,383 85,200 84,800 84,400 84,400 510,193 18 8th Street NE and SE 104th St Intersection Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - REET 2 - - - - - - - Traffic Impact Fees - - - - - - - 20 Auburn Way South and M Street SE Intersection Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - Traffic Mitigation Fees - - - - - - - 23 A St SE Non-Motorized and Access Improvements Capital Costs 89,029 - - - - - 89,029 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 89,029 - - - - - 89,029 Other - - - - - - - 24 Academy Drive Multi-Use Trail Capital Costs - - - 425,000 425,000 - 850,000 Funding Sources: Unrestricted Street Revenue - - - 42,500 42,500 - 85,000 Grants - - - 382,500 382,500 - 765,000 Other - - - - - - - 25 46th Place S Realignment Capital Costs - - - - - 825,000 825,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - 575,000 575,000 Traffic Impact Fees - - - - - 250,000 250,000 33 BNSF 3rd Rail Expansion Roadway Improvements Capital Costs 25,000 - - - - - 25,000 Funding Sources: Unrestricted Street Revenue 25,000 - - - - - 25,000 Grants - - - - - - - Other - - - - - - - 39 124th Ave SE Corridor & 320th Intersection Improvements Capital Costs - - - 100,000 800,000 - 900,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 80,000 640,000 - 720,000 Traffic Impact Fees - - - 20,000 160,000 - 180,000 40 124th Ave SE Corridor Improvements Phase 2 Capital Costs 500,000 1,100,000 2,500,000 - - - 4,100,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 400,000 880,000 2,500,000 - - - 3,780,000 Traffic Impact Fees 100,000 220,000 - - - - 320,000 City of Auburn Capital Facilities Plan 24 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Capacity Projects: 41 R Street Bypass Capital Costs - - - - - 500,000 500,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Other - - - - - 500,000 500,000 42 SE 320th Street Corridor Improvements Phase 1 Capital Costs 250,000 4,000,000 - - - - 4,250,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 200,000 4,000,000 - - - - 4,200,000 Traffic Impact Fees 50,000 - - - - - 50,000 43 Auburn Way South Corridor Safety Improvements Capital Costs 2,333,108 - - - - - 2,333,108 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 2,083,108 - - - - - 2,083,108 Traffic Impact Fees 250,000 - - - - - 250,000 47 Traffic Management Center Improvements Capital Costs 150,000 - - - - - 150,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 150,000 - - - - - 150,000 49 West Valley Highway Improvements (15th St NW to W Main St) Capital Costs 100,000 - 600,000 3,000,000 - - 3,700,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 480,000 2,400,000 - - 2,880,000 Traffic Impact Fees 100,000 - 120,000 600,000 - - 820,000 51 Lake Tapps Parkway ITS Expansion Capital Costs 900,000 - - - - - 900,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 711,000 - - - - - 711,000 Traffic Impact Fees 189,000 - - - - - 189,000 53 AWS and 12th Street SE Intersection Improvements Capital Costs 50,000 350,000 - - - - 400,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - 250,000 - - - - 250,000 Traffic Impact Fees 50,000 100,000 - - - - 150,000 54 Kersey Way Study Capital Costs 50,000 - - - - - 50,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Mitigation Fees 50,000 - - - - - 50,000 55 W Main Street Multimodal Corridor and ITS Improvements Capital Costs 946,000 3,494,400 - - - - 4,440,400 Funding Sources: Unrestricted Street Revenue - - - - - - - Other- Fund 105 85,410 314,510 - - - - 399,920 Traffic Impact Fees 56,490 209,650 - - - - 266,140 Grants 804,100 2,970,240 - - - - 3,774,340 City of Auburn Capital Facilities Plan 25 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Capacity Projects: 56 Evergreen Heights Safe Routes to School Improvements Capital Costs 790,000 563,000 4,620,000 - - - 5,973,000 Funding Sources: Unrestricted Street Revenue 118,500 84,500 693,000 - - - 896,000 Grants 671,500 478,500 3,927,000 - - - 5,077,000 Other - - - - - - - 58 Auburn Way South Corridor Improvements, Fir ST SE to Hemlock ST SE Capital Costs 200,000 - - - - - 200,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 200,000 - - - - - 200,000 Other (MIT)- - - - - - - 59 Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements Capital Costs 50,000 - 300,000 - - - 350,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 250,000 - - - 250,000 Traffic Impact Fees 50,000 - 50,000 - - - 100,000 60 M Street SE Corridor (8th St SE to AWS) Capital Costs - - - 1,900,000 4,750,000 - 6,650,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 925,000 3,750,000 - 4,675,000 Traffic Impact Fees - - - 725,000 750,000 - 1,475,000 Other - - - 250,000 250,000 - 500,000 61 Auburn Way South Bypass -Riverwalk Dr to SR-18 at R St SE Capital Costs - - - - - 6,000,000 6,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - 4,800,000 4,800,000 Other - - - - - 1,200,000 1,200,000 63 29th Street SE & R Street SE Intersection Improvements Capital Costs - - - 1,800,000 - - 1,800,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 1,300,000 - - 1,300,000 REET2 - - - - - - - Traffic Impact Fees - - - 500,000 - - 500,000 64 Lea Hill Segment 1 (R St NE to 105th Pl SE) Capital Costs 150,000 - - 2,450,000 10,000,000 - 12,600,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 1,950,000 8,000,000 - 9,950,000 Traffic Impact Fees 150,000 - - 500,000 2,000,000 - 2,650,000 Other - - - - - - - 65 Lea Hill Rd Segment 2 (105th Ave SE to 112th Ave SE) Capital Costs - - - - 3,500,000 8,500,000 12,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 2,900,000 7,100,000 10,000,000 Traffic Impact Fees - - - - 600,000 1,400,000 2,000,000 Other - - - - - - - City of Auburn Capital Facilities Plan 26 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Capacity Projects: 66 Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE) Capital Costs - - - 1,000,000 3,000,000 - 4,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 3,000,000 - 3,000,000 Traffic Impact Fees - - - 1,000,000 - - 1,000,000 Other - - - - - - - 69 I Street NE and 22nd St NE Roundabout Safety Improvement Capital Costs 200,000 1,175,000 - - - - 1,375,000 Funding Sources: Grants 160,000 940,000 - - - - 1,100,000 Traffic Impact Fees 40,000 235,000 - - - - 275,000 Other - - - - - - - 72 West Valley Highway Improvements (SR-18 to 15th St SW) Capital Costs 100,000 - 500,000 2,500,000 - - 3,100,000 Funding Sources: Grants - - 400,000 2,000,000 - - 2,400,000 Traffic Impact Fees 100,000 - 100,000 500,000 - - 700,000 Other - - - - - - - Subtotal, Capacity Projects: Capital Costs 13,657,180 11,173,437 11,285,280 16,189,300 22,713,320 16,062,750 91,081,267 TIP#Non-Capacity Projects: 3 Auburn Way Corridor Improvements Capital Costs - - - 818,700 3,000,000 - 3,818,700 Funding Sources: Unrestricted Street Revenue - - - 110,000 600,000 - 710,000 Grants - - - 708,700 2,400,000 - 3,108,700 Other - - - - - - - 19 Auburn Way North/1st Street NE Signal Improvements Capital Costs 50,000 - 550,000 - - - 600,000 Funding Sources: Unrestricted Street Revenue 50,000 - 125,000 - - - 175,000 Grants - - 425,000 - - - 425,000 Other - - - - - - - 21 Main Street Signal Upgrades Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - Other - - - - - - - 27 A Street SE Safety Improvements Study Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - Other - - - - - - - 29 So. 277th, Wetland Mitigation Capital Costs 25,000 - - - - - 25,000 Funding Sources: Unrestricted Street Revenue 25,000 - - - - - 25,000 Grants - - - - - - - Other - - - - - - - City of Auburn Capital Facilities Plan 27 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Non-Capacity Projects: 30 Citywide Pedestrian Accessibility & Safety Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Unrestricted Street Revenue 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Grants - - - - - - - Other - - - - - - - 31 Citywide Arterial Bicycle & Safety Improvements Capital Costs - 100,000 - 100,000 - 100,000 300,000 Funding Sources: Unrestricted Street Revenue - 100,000 - 100,000 - 100,000 300,000 Grants - - - - - - - Other - - - - - - - 38 37th St NW & B St NW Railroad Crossing Safety Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - Other - - - - - - - 44 A Street NE Pedestrian Improvements Capital Costs - - - 150,000 - - 150,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 150,000 - - 150,000 Other - - - - - - - 45 Interurban Trailhead Improvements Capital Costs - - - 210,000 - - 210,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 210,000 - - 210,000 46 104th Ave SE & Green River Road Study Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - 48 A St SE & 6th St SE Safety and Access Improvements Capital Costs 50,000 - - - - - 50,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Other 50,000 - - - - - 50,000 50 ITS Dynamic Message Signs Capital Costs - 100,000 200,000 200,000 - - 500,000 Funding Sources: Unrestricted Street Revenue - 15,000 30,000 30,000 - - 75,000 Grants - 85,000 170,000 170,000 - - 425,000 City of Auburn Capital Facilities Plan 28 TABLE T- 2 (continued) 2015 2016 2017 2018 2019 2020 Total TIP#Non-Capacity Projects: 62 AWS Streetscape Improvements (SR 18 to M St SE) Capital Costs - - - 1,950,000 2,800,000 - 4,750,000 Funding Sources: Unrestricted Street Revenue - - - 200,000 200,000 - 400,000 Grants - - - 1,750,000 2,600,000 - 4,350,000 REET 2 - - - - - - - 67 Citywide Traffic Signals Safety Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - 68 37th St SE & A St SE Traffic Signal Safety Improvement Capital Costs 176,400 637,500 - - - - 813,900 Funding Sources: Unrestricted Street Revenue 55,000 45,000 - - - - 100,000 Grants 121,400 440,000 - - - - 561,400 Other- Fund 105 - 152,500 - - - - 152,500 Subtotal, Non-Capacity Projects: Capital Costs 426,400 937,500 850,000 3,528,700 5,900,000 200,000 11,842,600 2015 2016 2017 2018 2019 2020 Total SUMMARY: CAPITAL COSTS Capacity Projects 13,439,937 10,957,400 11,070,000 15,975,000 22,500,000 15,850,000 89,792,337 Non-Capacity Projects 426,400 937,500 850,000 3,528,700 5,900,000 200,000 11,842,600 Long-Term Debt 217,243 216,037 215,280 214,300 213,320 212,750 1,288,930 Total Costs 14,083,580 12,110,937 12,135,280 19,718,000 28,613,320 16,262,750 102,923,867 FUNDING SOURCES: Unrestricted Street Revenue 408,500 344,500 948,000 582,500 942,500 200,000 3,426,000 Grants 9,560,137 10,243,740 10,172,000 14,246,200 23,672,500 12,475,000 80,369,577 Traffic Impact Fees 2,929,533 1,055,687 1,015,280 4,514,300 3,748,320 1,887,750 15,150,870 Traffic Mitigation Fees 50,000 - - - - - 50,000 REET2 - - - - - - - PWTF Loan - - - - - - - Fund 105 -Arterial St. Preserv.85,410 467,010 - - - - 552,420 Other (Other Agencies)1,050,000 - - 375,000 250,000 1,700,000 3,375,000 Total Funding 14,083,580 12,110,937 12,135,280 19,718,000 28,613,320 16,262,750 102,923,867 City of Auburn Capital Facilities Plan 29 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: A Street NW - Phase 1 (3rd St NW to 14th St NW) TIP # 1 Project No:c207a0 Project Type:Capacity Project Manager:Ingrid Gaub LOS Corridor ID# 18 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 187,712 66,028 253,740 Grants- Secured (Fed,State,Local)6,562,702 6,562,702 Traffic Impact Fees 956,198 101,672 350,000 25,000 1,407,870 Other Sources -Multicare Contribution 382,817 382,817 8,089,429 167,700 350,000 25,000 8,607,129 Capital Expenditures: Design 2,247,331 50,000 10,000 2,297,331 Right of Way 821,341 821,341 Construction 5,020,757 167,700 300,000 15,000 5,488,457 8,089,429 167,700 350,000 25,000 8,607,129 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - Grants- Secured (Fed,State,Local)- Traffic Impact Fees 25,000 25,000 25,000 25,000 475,000 Other Sources -Multicare Contribution - 25,000 25,000 25,000 25,000 475,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 100,000 Right of Way - Construction 15,000 15,000 15,000 15,000 375,000 25,000 25,000 25,000 25,000 475,000 Grants / Other Sources: Description: Construct a new multi-lane arterial from 3rd Street NW to 14th Street NW. This project will improve mobility and is tied to corridor development. It is consistent with the Comprehensive Plan and completes a missing link of a north/south arterial corridor. The project length is approximately three-quarters of a mile. The City purchased right-of-way from the northern property owner. If the property develops, some or a portion of those funds may be reimbursed to the City (total cost was $251,000). Progress Summary: Pre-design was completed prior to 2007. Final design and environmental permitting were completed in 2011 and construction was completed in 2013. Major plantings are scheduled in 2015 as part of the wetland monitoring that is required to continue until 2023. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $25,830. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 30 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way South Pedestrian Imp. (Dogwood St SE to Fir St SE)TIP # 2 Project No:cp1118 Project Type:Capacity, Non-Motorized Project Manager:Jacob Sweeting LOS Corridor ID# 4 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 6,446 92,554 - - 99,000 Grants- Secured (Fed,State,Local)211,454 629,376 - - 840,830 Traffic Impact Fees - 115,000 - 115,000 Other Sources(Muckleshoot)- 330,000 - - 330,000 217,900 1,051,930 115,000 - 1,384,830 Capital Expenditures: Design 217,900 71,930 - - 289,830 Right of Way - - - - - Construction - 980,000 115,000 - 1,095,000 217,900 1,051,930 115,000 - 1,384,830 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 115,000 Other Sources(Muckleshoot)- - - - - - - - - 115,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 115,000 - - - - 115,000 Grants / Other Sources: Description: This project will construct pedestrian improvements along Auburn Way South between Dogwood Street SE and Fir Street SE that are consistent with WSDOT's SR-164 Route Development Plan. The project includes sidewalk improvements, access management, a mid-block pedestrian crossing, construction of a U-turn wedge for eastbound vehicles at Fir Street SE and street lighting. Progress Summary: The City was awarded $100,000 in federal funding and $740,830 in state funding in May 2011. Other funding source is Muckleshoot Indian Tribe contribution. Project design began in 2012. Design is expected be completed in 2014 and construction to be completed in 2015. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 31 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: M Street Underpass (3rd St SE to 8th St SE) TIP # 5 Project No:c201a0 Project Type:Capacity Project Manager:Ryan Vondrak LOS Corridor ID# 6 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 163,958 - - - 163,958 Grants- Secured (Fed,State,Local)9,497,554 - - - 9,497,554 REET2 1,140,000 - - - 1,140,000 Traffic Impact Fees (Construction)4,332,708 - - - 4,332,708 Traffic Impact Fees (Debt Service)10,550 127,490 131,233 130,654 269,273 Traffic Mitigation Fees 660,000 - - - 660,000 PWTFL (30 years)3,044,491 215,500 - - 3,259,991 Other Sources (Other Agencies)*3,091,282 - - - 3,091,282 21,940,543 342,990 131,233 130,654 22,414,766 Capital Expenditures: Design 2,688,924 - - - 2,688,924 Right of Way 3,358,443 - - - 3,358,443 Construction 15,882,626 215,500 - - 16,098,126 PWTFL Debt Service 10,550 127,490 131,233 130,654 269,273 21,940,543 342,990 131,233 130,654 22,414,766 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET2 - - - - - Traffic Impact Fees (Construction)- - - - - Traffic Impact Fees (Debt Service)130,080 129,500 128,920 128,350 778,737 Traffic Mitigation Fees - - - - - PWTFL (30 years)- - - - - Other Sources (Other Agencies)*- - - - - 130,080 129,500 128,920 128,350 778,737 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - PWTFL Debt Service 130,080 129,500 128,920 128,350 778,737 130,080 129,500 128,920 128,350 778,737 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Grants / Other Sources: Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway Description: Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks. Progress Summary: 100% Design Drawings and right of way acquisition were completed in 2011. Construction started in early 2012 and will be complete during 2014. Debt Service is scheduled each year through 2041. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $21,827. City of Auburn Capital Facilities Plan 32 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements TIP # 6 Project No:c222a0 STIP# AUB-42 Project Type:Capacity Project Manager:Ryan Vondrak LOS Corridor ID# 15 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 33,011 357,590 - - 390,601 Grants- Secured State 90,503 930,197 4,000,000 - 5,020,700 Traffic Impact Fees - - 581,800 - 581,800 Other (Development Funds)*- - 1,000,000 - 1,000,000 Other - - - - - 123,514 1,287,787 5,581,800 - 6,993,101 Capital Expenditures: Design 123,514 1,267,787 - - 1,391,301 Right of Way - 20,000 - - 20,000 Construction - - 5,581,800 - 5,581,800 123,514 1,287,787 5,581,800 - 6,993,101 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - 4,000,000 Traffic Impact Fees - - - - 581,800 Other (Development Funds)*- - - - 1,000,000 Other - - - - - - - - - 5,581,800 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,581,800 - - - - 5,581,800 Grants / Other Sources: Total Funding Sources: Description: This project includes preliminary engineering, design, right-of-way acquisition and construction of major widening on S 277th Street, including the addition of three lanes, one westbound and two eastbound, a Class 1 trail, and storm improvements. The project is approximately 0.9 miles long. Progress Summary: Staff is coordinating with the City of Kent and King County to complete annexation of the roadway into the City of Auburn. Robertson Properties Group is participating in this project and is dedicating all necessary roadway frontage to the City. Future Impact on Operating Budget: The annual maintenance costs for this project is estimated to be $27,250. Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 33 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: F Street SE Non-Motorized Improvements (Downtown to Les Gove) TIP # 10 Project No:cp0911 Project Type:Capacity, Non-Motorized Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 141 - - - 141 Grants- Secured Federal - - 320,000 200,000 320,000 REET - - - - - Traffic Impact Fees 7,700 - 80,000 50,000 87,700 Other - - - - - 7,841 - 400,000 250,000 407,841 Capital Expenditures: Design 7,841 - 400,000 200,000 607,841 Right of Way - - - 50,000 - Construction - - - - - 7,841 - 400,000 250,000 407,841 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed)1,440,000 - - - 1,960,000 REET - - - - - Traffic Impact Fees 360,000 - - - 490,000 Other - - - - 1,800,000 - - - 2,450,000 Capital Expenditures: Design - - - - 600,000 Right of Way - - - - 50,000 Construction 1,800,000 - - - 1,800,000 1,800,000 - - - 2,450,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Description: The F St SE project includes pavement rehabilitation, installation of curbs, gutters, bike lanes, sidewalks, ADA improvements, utility undergrounding, LED street lighting, new two way center left turn-lane, crash attenuation at the supports for the BNSF railroad bridge, initiation of Auburn Staff Bike share pilot program, wayfinding signage and a "Bicycle Boulevard" designation of roadway connections between Auburn City Hall and the Les Gove Park Campus. This project improves mobility and safety along the corridor and will complete a gap in the non-motorized network between Auburn's Downtown and the Les Gove Community Campus. The major infrastructure improvements are approximately 0.3 miles long and the "Bicycle Boulevard" improvements are just over a mile long. Progress Summary: Preliminary design and survey work was completed in 2009. Federal grant was secured in 2014 for Design and ROW phases. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $4,100. City of Auburn Capital Facilities Plan 34 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: M Street NE (E Main St to 4th St NE) TIP # 11 Project No:asbd12 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 5 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - 100,000 - 100,000 Other - - - - - - - 100,000 - 100,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - - Construction - - - - - - - 100,000 - 100,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)220,000 920,000 - - 1,140,000 REET - - - - - Traffic Impact Fees 55,000 230,000 - - 385,000 Other - - - - - 275,000 1,150,000 - - 1,525,000 Capital Expenditures: Design 75,000 - - - 175,000 Right of Way 200,000 - - - 200,000 Construction - 1,150,000 - - 1,150,000 275,000 1,150,000 - - 1,525,000 Grants / Other Sources: Description: This project will construct a four-lane street section that includes sidewalks, gutters, landscaping and streetlights on M St NE between south of E Main St and 4th St NE. Progress Summary: Pre-design will be completed during 2015 to refine project scope, alignment, and cost. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 35 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: M Street SE/12th Street SE Traffic Signal TIP # 14 Project No:cpxxxx Project Type:Intersection Improvement, Capacity Project Manager:TBD LOS Corridor ID# 11 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET 2 - - - - - Traffic Impact Fees - - - - - Other- Developer - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 500,000 - - 500,000 REET 2 - - - - - Traffic Impact Fees - - - - - Other- Developer - 125,000 - - 125,000 - 625,000 - - 625,000 Capital Expenditures: Design - 75,000 - - 75,000 Right of Way - 50,000 - - 50,000 Construction - 500,000 - - 500,000 - 625,000 - - 625,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project includes the design, right-of-way acquisition and construction of a new traffic signal. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $6,600. City of Auburn Capital Facilities Plan 36 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 8th Street NE Widening (Pike St NE to R St NE)TIP # 15 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)360,000 800,000 - - 1,160,000 REET - - - - - Traffic Impact Fees 90,000 200,000 - - 290,000 Other - - - - - 450,000 1,000,000 - - 1,450,000 Capital Expenditures: Design 200,000 - - - 200,000 Right of Way 250,000 - - - 250,000 Construction - 1,000,000 - - 1,000,000 450,000 1,000,000 - - 1,450,000 Grants / Other Sources: Description: Widen 8th Street NE to extend the five-lane cross-section which currently exists to the west of Pike St NE to R St NE by providing an additional travel lane along the south side of the roadway. This is a planning level cost estimate. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 37 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Harvey Rd NE/8th St NE Intersection Improvements TIP # 17 Project No:cp0611 Project Type:Capacity Project Manager:None LOS Corridor ID# 5,19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)349,000 86,500 86,010 85,383 521,510 Traffic Impact Fees 204,500 - - - 204,500 PWTF 1,527,300 - - - 1,527,300 2,080,800 86,500 86,010 85,383 2,253,310 Capital Expenditures: Design 327,500 - - - 327,500 Right of Way 200,400 - - - 200,400 Construction 1,203,900 - - - 1,203,900 Long Term Debt - PWTF 349,000 86,500 86,010 85,383 521,510 2,080,800 86,500 86,010 85,383 2,253,310 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)85,200 84,800 84,400 84,400 510,193 Traffic Impact Fees - - - - - PWTF - - - - - 85,200 84,800 84,400 84,400 510,193 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - Long Term Debt - PWTF 85,200 84,800 84,400 84,400 510,193 85,200 84,800 84,400 84,400 510,193 Grants / Other Sources: Total Funding Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: Description: Add one eastbound through/right turn-lane on 8th St NE to the west of Harvey Rd. Modify traffic signals and traffic channelization to accommodate the new lane. The additional lane will reduce traffic delays and queuing at the intersection of Harvey Rd and 8th St NE in all directions. This project will reconstruct M St NE from 4th St NE to 8th St NE, a segment of roadway approximately 0.3 miles long with a four-lane cross-section. The reconstruction will address the existing poor pavement condition and fill in any gaps in the sidewalk network. Progress Summary: Project was completed in 2010. Ongoing budget is for Public Works Trusf Fund Loan debt payments scheduled through 2028. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 38 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 8th St NE/104th Ave SE Intersection Improvements TIP # 18 Project No:cp1104 STIP# AUB-40 Project Type:Intersection Improvement, Capacity Project Manager:Matt Larson LOS Corridor ID# 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 8,600 148,400 5,000 - 162,000 Grants- Secured (Fed,State,Local)40,816 59,184 - - 100,000 REET2 2,608 119,000 - - 121,608 Traffic Impact Fees - - - - - Other (Redflex)- - - - - 52,024 326,584 5,000 - 383,608 Capital Expenditures: Design 50,546 38,000 - - 88,546 Right of Way 1,478 - - - 1,478 Construction - 288,584 5,000 - 293,584 52,024 326,584 5,000 - 383,608 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - REET2 - - - - - Traffic Impact Fees - - - - - Other (Redflex)- - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project includes the design, right-of-way acquisition and construction of intersection improvements including a traffic signal with accommodation for an eastbound U-turn movement. Progress Summary: The design began in 2011 with construction scheduled for 2014. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $6,600. City of Auburn Capital Facilities Plan 39 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way South/M St SE Intersection Improvements TIP # 20 Project No:cp1024 Project Type:Capacity Project Manager:Jacob Sweeting LOS Corridor ID# 3,4 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 38,815 61,185 5,000 - 105,000 Grants- Secured (Fed,State,Local)59,080 390,920 - - 450,000 Traffic Impact Fees - 125,000 - - 125,000 Traffic Mitigation Funds 37,368 112,632 - - 150,000 Other - - - - - 135,263 689,737 5,000 - 830,000 Capital Expenditures: Design 121,174 163,000 - - 163,000 Right of Way 14,089 85,737 - - 99,826 Construction - 441,000 5,000 - 446,000 135,263 689,737 5,000 - 830,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Traffic Mitigation Funds - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Description: This project is the first phase of improvements at the Auburn Way South/M St SE intersection. The project will construct new westbound to northbound right-turn pockets, improved turning radius on the northeast corner, realignment of the westbound 17th St SE approach to Auburn Way South, lighting improvements, related traffic signal modifications and right of way acquisition. Progress Summary: Pre-design was completed in 2012. Final design and right-of-way acquisition began in 2013 and construction is planned for 2014. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 40 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: A Street SE Non-Motorized and Access Improvements TIP # 23 Project No:c229a0, asbd03 Project Type:Class 1 Trail (Capacity) Project Manager:Ryan Vondrak LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 53,900 - - - 53,900 Grants- Secured (Fed,State,Local)170,400 - 89,029 - 259,429 REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 224,300 - 89,029 - 313,329 Capital Expenditures: Design 224,300 - 89,029 - 313,329 Right of Way - - - - - Construction - - - - - 224,300 - 89,029 - 313,329 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - 89,029 REET - - - - - Traffic Impact Fees - - - - - Other (Other Agencies)*- - - - - - - - - 89,029 Capital Expenditures: Design - - - - 89,029 Right of Way - - - - - Construction - - - - - - - - - 89,029 Grants / Other Sources: Expenditures prior to 2013 were for project c229a0. Description: Preliminary design of improvements to A Street SE between the White River Bridge and 41st Street SE, including a signalized pedestrian crossing and access management including consolidation of commercial driveways. Progress Summary: Remaining grant funds from the BNSF/E Valley Highway Pedestrian Underpass project are in the process of being reprogrammed to this project. Preliminary design work has not begun. Expenditures prior to 2013 were for project c229a0. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 41 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Academy Drive Multi-Use Trail TIP # 24 Project No:cpxxxx Project Type:Class 1 Trail (Capacity) Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - 42,500 42,500 - 85,000 Grants- Unsecured (Fed,State,Local)- 382,500 382,500 - 765,000 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - 425,000 425,000 - 850,000 Capital Expenditures: Design - 100,000 - - 100,000 Right of Way - - - - - Construction - 325,000 425,000 - 750,000 - 425,000 425,000 - 850,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will use existing Academy Drive right-of-way to create a multi-use trail between the Green River Road and Auburn Way South. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. City of Auburn Capital Facilities Plan 42 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 46th Place S Realignment TIP # 25 Project No:cpxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - 575,000 575,000 REET - - - - - Traffic Impact Fees - - - 250,000 250,000 Other Sources - - - - - - - - 825,000 825,000 Capital Expenditures: Design - - - 125,000 125,000 Right of Way - - - 25,000 25,000 Construction - - - 675,000 675,000 - - - 825,000 825,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project will realign 46th Place S to the south of S 321st Street. The realignment will move the 46th Place S intersection with S 321st Street approximately 350 feet to the east of the current location. This will create two T-intersections (44th Avenue S and 46th Place S) in place of the existing four-leg intersection. The existing 46th Place S will be dead-ended to the south of S 321st Street. The project will improve safety and traffic operations at the intersections. Progress Summary: Right-of-way for the realigned roadway will be dedicated as part of an adjacent development project. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,750. City of Auburn Capital Facilities Plan 43 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: BNSF 3rd Rail Expansion Roadway Improvements TIP # 33 Project No:asbd06 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 13, 18 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - 25,000 - 25,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - 25,000 - 25,000 Capital Expenditures: Design - - 5,000 - 5,000 Right of Way - - - - - Construction - - 20,000 - 20,000 - - 25,000 - 25,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - 25,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - 20,000 - - - - 25,000 Grants / Other Sources: Description: This project will design and construct roadway improvements associated with the construction of the 3rd rail line by BNSF. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 44 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 124th Ave SE Corridor & 320th Intersection Improvements TIP # 39 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23, 25 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - Grants- Unsecured (Fed,State,Local)- 80,000 640,000 - 720,000 Traffic Impact Fees - 20,000 160,000 - 180,000 Other - - - - 100,000 800,000 - 900,000 Capital Expenditures: Design - 100,000 - - 100,000 Right of Way - - 50,000 - 50,000 Construction - - 750,000 - 750,000 - 100,000 800,000 - 900,000 Grants / Other Sources: Description: This project will fund the design, right-of-way acquisition, and construction of improvements to the signalized SE 320th St and 124th Ave SE intersection. Improvements include constructing bike lanes, sidewalks, dual southbound left-turn lanes into Green River Community College, and Intelligent Transportation System improvements. The intersection is located at the main entrance to Green River Community College and will require additional on-site improvements to be constructed by Green River Community College. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 45 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 124th Ave SE Corridor Improvements - Phase 2 TIP # 40 Project No:asbd01 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - 400,000 880,000 400,000 Traffic Impact Fees - - 100,000 220,000 100,000 Other - - - - - - - 500,000 1,100,000 500,000 Capital Expenditures: Design - - 500,000 - 500,000 Right of Way - - - 1,100,000 - Construction - - - - - - - 500,000 1,100,000 500,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal 2,500,000 - - - 3,780,000 Traffic Impact Fees - - - - 320,000 Other - - - - - 2,500,000 - - - 4,100,000 Capital Expenditures: Design - - - - 500,000 Right of Way - - - - 1,100,000 Construction 2,500,000 - - - 2,500,000 2,500,000 - - - 4,100,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will fund the design, right-of-way acquisition, and construction of a four-lane section with bicycle and pedestrian facilities on 124th Ave SE between SE 318th St and SE 312th Street. The project will also fund improvements to the signalized intersection of SE 312th St and 124th Ave SE (including adding bike lanes, dual westbound left-turn lanes, dual southbound through-lanes, a northbound right-turn pocket, ITS improvements, and pedestrian safety improvements). Progress Summary: Phase 1 improvements between SE 318th and SE 316th were completed by GRCC in 2012. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 46 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: R Street Bypass (M Street SE to SR-18)TIP # 41 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources (Development)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources (Development)- - - 500,000 500,000 - - - 500,000 500,000 Capital Expenditures: Design - - - 500,000 500,000 Right of Way - - - - - Construction - - - - - - - - 500,000 500,000 Grants / Other Sources: Description: This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and Auburn Black Diamond Road, paralleling the rail line. The project will provide an arterial connection from the newly constructed M Street Underpass to the Auburn Black Diamond Road interchange with SR-18 to keep both vehicular and freight traffic out of residential neighborhoods along R Street SE north of the Stampede Pass line. The arterial connection may also provide opportunities for partnering with the Muckleshoot Indian Tribe as they redevelop the Miles Pit area and as more definitive plans are developed for a potential new WSDOT interchange on SR-18 in the vicinity of the project. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 47 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: SE 320th Street Corridor Improvements Phase 1 TIP # 42 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 25 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - 640,000 200,000 4,000,000 840,000 Traffic Impact Fees - 160,000 50,000 - 210,000 PWTFL - - - - - Other - - - - - - 800,000 250,000 4,000,000 1,050,000 Capital Expenditures: Design - 800,000 - - 800,000 Right of Way - - 250,000 - 250,000 Construction - - - 4,000,000 - - 800,000 250,000 4,000,000 1,050,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 4,200,000 Traffic Impact Fees - - - - 50,000 PWTFL - - - - - Other - - - - - - - - - 4,250,000 Capital Expenditures: Design - - - - - Right of Way - - - - 250,000 Construction - - - - 4,000,000 - - - - 4,250,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: SE 320th St is a primary route serving Green River Community College and adjacent neighborhoods. There are very high volumes of pedestrians, bicyclists, and transit utilizing the corridor. This project will fund the design, right-of-way acquisition, and construction of non-motorized roadway and safety improvements including a roundabout at 116th Ave SE, adding bicycle lanes, sidewalks, and street lighting between 122nd Ave SE and 116th Ave SE. Project length is approximately .45 miles. Progress Summary: GRCC completed the design and construction for the segment between 124th Ave SE and 122nd Ave SE in 2013. Corridor design is scheduled to start in 2015. Construction is planned for 2017. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 48 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way South (SR-164) Corridor Safety Improvements TIP # 43 Project No:cp1218 STIP# AUB-44 Project Type:Capacity Project Manager:Matt Larson LOS Corridor ID# 4 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 2,684 - - - 2,684 Grants- Secured (Fed,State,Local)2,738 247,262 2,083,108 - 2,333,108 Traffic Impact Fees - 250,000 - 250,000 PWTFL - - - - - Other - - - - - 5,422 247,262 2,333,108 - 2,585,792 Capital Expenditures: Design 5,422 239,762 93,000 - 338,184 Right of Way - 7,500 62,000 - 69,500 Construction - - 2,178,108 - 2,178,108 5,422 247,262 2,333,108 - 2,585,792 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - 2,083,108 Traffic Impact Fees - - - - 250,000 PWTFL - - - - - Other - - - - - - - - - 2,333,108 Capital Expenditures: Design - - - - 93,000 Right of Way - - - - 62,000 Construction - - - - 2,178,108 - - - - 2,333,108 Grants / Other Sources: Description: This project will improve access management, including U-turns, upgrade transit stops and street lighting, widen to accommodate turn-lanes and pedestrian and bicycle facilities, upgrade pavement markings, install pedestrian signals and audible pedestrian push buttons, and upgrade traffic signals to change the phasing and to improve the visibility of the signal heads. Progress Summary: Grant funding was awarded in 2012 and does not require a local match. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 49 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Traffic Management Center Improvements TIP # 47 Project No:asbd10 Project Type:Capacity, ITS Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - 150,000 - 150,000 PWTFL - - - - - Other - - - - - Total Funding Sources:- - 150,000 - 150,000 Capital Expenditures: Design - - 25,000 - 25,000 Right of Way - - - - - Construction - - 125,000 - 125,000 Total Expenditures:- - 150,000 - 150,000 Forecasted Project Cost: Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 150,000 PWTFL - - - - - Other - - - - - Total Funding Sources:- - - - 150,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - - - - 125,000 Total Expenditures:- - - - 150,000 Grants / Other Sources: Description: The rapid growth of the City traffic signal and Intelligent Transportation Systems infrastructure has severely strained the capacity and reliability of the existing network processing capabilities. This project will implement network communications, software, video, and physical improvements to the Traffic Management Center which will improve the network data processing speed, reliability, and redundancy improving the City's ability to manage the transportation system and respond to emergencies. Additionally, these improvement will allow Information & Technology staff to isolate the Traffic Management data processing demands from the City's general facility security data processing demands resulting in improvements to both processes. Progress Summary: Future Impact on Operating Budget: There is no impact to the street maintenance budget. City of Auburn Capital Facilities Plan 50 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: West Valley Highway Improvements (15th Street NW to W Main Street)TIP # 49 Project No:asbd13 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 35 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - 100,000 - 100,000 - - 100,000 - 100,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - - Construction - - - - - - - 100,000 - 100,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)480,000 2,400,000 - - 2,880,000 Traffic Impact Fees 120,000 600,000 - - 820,000 600,000 3,000,000 - - 3,700,000 Capital Expenditures: Design 600,000 - - - 700,000 Right of Way - - - - - Construction - 3,000,000 - - 3,000,000 600,000 3,000,000 - - 3,700,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project scope includes pavement rehabilitation and re-channelization, roadway widening, bicycle lanes, pedestrian facilities, roadway lighting, required storm system improvements, and Intelligent Transportation System Improvements. Progress Summary: Survey, base mapping and pre-design are planned to be completed in 2015 to complete preliminary plans and refine project cost-estimate. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 51 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Lake Tapps Parkway ITS Expansion TIP # 51 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 10 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - 82,950 711,000 - 793,950 REET - - - - - Traffic Impact Fees - 22,050 189,000 - 211,050 Other - - - - - - 105,000 900,000 - 1,005,000 Capital Expenditures: Design - 105,000 - - 105,000 Right of Way - - - - - Construction - - 900,000 - 900,000 - 105,000 900,000 - 1,005,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 711,000 REET - - - - - Traffic Impact Fees - - - - 189,000 Other - - - - - - - - - 900,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 900,000 - - - - 900,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: The project funds the design, coordination, permitting, and construction of new Intelligent Transportation System (ITS) infrastructure along Lake Tapps Parkway from Lakeland Hills Way to East Valley Highway, and along East Valley Highway to Lakeland Hills Way. The proposed ITS infrastructure includes conduit, fiber, VMS signage, cameras, network communication upgrades, and weather stations along the route. Progress Summary: Federal Grant application was submitted to PSRC in May 2014. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. City of Auburn Capital Facilities Plan 52 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Auburn Way South and 12th Street SE Intersection Improvements TIP # 53 Project No:cp1114 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 3 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - 250,000 - REET2 - - - - - Traffic Impact Fees - - 50,000 100,000 50,000 Other - - - - - - - 50,000 350,000 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - 350,000 - - - 50,000 350,000 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 250,000 REET2 - - - - - Traffic Impact Fees - - - - 150,000 Other - - - - - - - - - 400,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - 350,000 - - - - 400,000 Grants / Other Sources: Description: The project will design and construct multi-modal intersection improvements at the AWS/12th Street SE intersection. The improvements will include pedestrian access, bicycle lanes, signal phasing and timing, and ITS upgrades. Progress Summary: Design is scheduled to be completed in 2015. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 53 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Kersey Way SE Corridor Study TIP # 54 Project No:asbd11 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 4 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - 50,000 - 50,000 Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - - - - - - Traffic Mitigation Fees - - - - 50,000 Other (Developer)*- - - - - - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - - - - - 50,000 Grants / Other Sources: Description: This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The study will develop the scope and costs for horizontal /vertical geometric roadway improvements, provide roadside hazard mitigation, street lighting and non-motorized trail construction. The project length is approximately two miles. Progress Summary: Design will begin in 2015 following the completion of the update to the Comprehensive Plan. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 54 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: W Main Street Multimodal Corridor and ITS Improvements TIP # 55 Project No:cp1414 Project Type:Capacity Project Manager:Kim Truong LOS Corridor ID# 11 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured Federal - - 804,100 2,970,240 804,100 REET - - - - - Traffic Impact Fees - - 56,490 209,650 56,490 Other (Arterial Preservation Fund 105)- - 85,410 314,510 85,410 - - 946,000 3,494,400 946,000 Capital Expenditures: Design - - 946,000 - 946,000 Right of Way - - - - - Construction - - - 3,494,400 - - - 946,000 3,494,400 946,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured Federal - - - - 3,774,340 REET - - - - - Traffic Impact Fees - - - - 266,140 Other (Arterial Preservation Fund 105)- - - - 399,920 - - - - 4,440,400 Capital Expenditures: Design - - - - 946,000 Right of Way - - - - - Construction - - - - 3,494,400 - - - - 4,440,400 Grants / Other Sources: Description: This project will repurpose the existing W Main St corridor within Auburn’s designated Regional Growth Center and will construct Intelligent Transportation System (ITS) improvements serving local and regional transportation networks and a major commercial retail center. Improvements include converting the existing four-lane roadway section to a three-lane section including center two-way left turn lane with new bike lanes, new sidewalks, new LED street lighting, and streetscape improvements between West Valley Highway and the Interurban Trail. ITS Improvements include interconnecting and coordinating traffic signals From C St NW along W Main St to W Valley Highway south to 15th St SW including two interchanges with SR-18 and one with SR-167. Progress Summary: Federal grant was secured in 2014. Arterial Preservation Fund 105 is participating in the pavement rehabilitation portion of this project. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 55 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Evergreen Heights Safe Routes to School Improvements TIP # 56 Project No:cpXXXX STIP# AUB-39 Project Type:Capacity, Non-Motorized Project Manager:TBD LOS Corridor ID# 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - 118,500 84,500 118,500 Grants- Unsecured Federal - - 671,500 478,500 671,500 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - 790,000 563,000 790,000 Capital Expenditures: Design - - 790,000 - 790,000 Right of Way - - - 563,000 - Construction - - - - - - - 790,000 563,000 790,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue 693,000 - - - 896,000 Grants- Unsecured Federal 3,927,000 - - - 5,077,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - 4,620,000 - - - 5,973,000 Capital Expenditures: Design - - - - 790,000 Right of Way - - - - 563,000 Construction 4,620,000 - - - 4,620,000 4,620,000 - - - 5,973,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: The project will widen S 316th Street from 51st Avenue S to the west of the Evergreen Elementary School frontage, and 56th Avenue S between S 316th Street and S 318th Street. The proposed widening will allow the addition of bike lanes and sidewalks on both sides of the street to match the existing roadway cross-section to the east of the school. A roundabout will be constructed at the S 316th Street/56th Avenue S intersection replacing the existing all-way stop-control and the school driveway will be relocated to the west to align with the roundabout. The reconstruction of S 316th Street includes the vertical alignment of the existing roadway along the school frontage which creates sight-distance problems associated with the school driveways, and at the intersection with 56th Avenue S. Other project elements include undergrounding of aerial utilities, street lighting, and upgrades to the storm water system. Progress Summary: Design phase Grant funding application was submitted in May 2014. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 56 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way S Corridor Improvements (Fir St SE to Hemlock St SE)TIP # 58 Project No:cp1119 STIP# AUB-38 Project Type:Capacity Project Manager:Jacob Sweeting LOS Corridor ID# 4 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 150 - - - 150 Grants- Secured State 364,449 2,061,951 - - 2,426,400 Traffic Impact Fees - - 200,000 - 200,000 Other Sources (Muckleshoot)91,112 745,489 - - 836,601 455,711 2,807,440 200,000 - 3,463,151 Capital Expenditures: Design 425,068 90,000 - - 515,068 Right of Way 30,643 406,000 - - 436,643 Construction - 2,311,440 200,000 - 2,511,440 455,711 2,807,440 200,000 - 3,463,151 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - - Traffic Impact Fees - - - - 200,000 Other Sources (Muckleshoot)- - - - - - - - - 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 200,000 - - - - 200,000 Grants / Other Sources: Description: This project will widen Auburn Way South between Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalks, illumination and storm improvements. A new traffic signal will be constructed at Hemlock Street SE and connect to Auburn's Intelligent Transportation System. Progress Summary: Washington State Transportation Improvement Board (TIB) awarded the City grant funds in the amount of $2,426,400 on November 19, 2010. The Muckleshoot Indian Tribe is a project partner and is contributing ROW dedications and project funding in the amount $836,601. Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $9,300. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 57 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements TIP # 59 Project No:cp1023 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 2 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 8,778 - - - 8,778 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - 50,000 - 50,000 REET2 - - - - - Other - - - - - 8,778 - 50,000 - 58,778 Capital Expenditures: Design 8,778 - 50,000 - 58,778 Right of Way - - - - - Construction - - - - - 8,778 - 50,000 - 58,778 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)250,000 - - - 250,000 Traffic Impact Fees 50,000 - - - 100,000 REET2 - - - - - Other - - - - - 300,000 - - - 350,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction 300,000 - - - 300,000 300,000 - - - 350,000 Grants / Other Sources: Description: This project will improve access, safety and operations for pedestrian, bicyclists and motorized vehicles at the intersections of 3rd St NE/Auburn Ave, 4th St NE/Auburn Ave, and 4th St NE/Auburn Way North. Improvements include a new traffic signal at 3rd St NE to add a missing pedestrian crossing and accommodate the northbound left-turn movement; improving pedestrian facilities to meet ADA requirements, restricting uncontrolled accesses near the intersection, and modifying the traffic signal at Auburn Way North and 4th St NE to eliminate the east/west split phase operation. Progress Summary: Survey and pre-design were started in 2010-2011. Pre-design will be completed in 2015, with construction scheduled for 2017, pending grant funding. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 58 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: M Street SE Corridor (8th St SE to AWS)TIP # 60 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 6 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other(Development)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 925,000 3,750,000 - 4,675,000 Traffic Impact Fees - 725,000 750,000 - 1,475,000 REET2 - - - - - Other(Development)- 250,000 250,000 - 500,000 - 1,900,000 4,750,000 - 6,650,000 Capital Expenditures: Design - 650,000 - - 650,000 Right of Way - 1,250,000 - - 1,250,000 Construction - - 4,750,000 - 4,750,000 - 1,900,000 4,750,000 - 6,650,000 Grants / Other Sources: Description: Widen M Street SE into a multi-lane arterial between 8th St SE and AWS. This project will improve mobility and is tied to corridor development. It is consistent with the Comprehensive Plan and contributes to the completion of a north/south arterial corridor. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $8,000. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 59 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way South Bypass - Riverwalk Dr to SR-18 at R St SE TIP # 61 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other (Development)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - Grants- Unsecured (Fed,State,Local)- - - 4,800,000 4,800,000 REET - - - - - Traffic Impact Fees - - - - - Other (Development)- - - 1,200,000 1,200,000 - - - 6,000,000 6,000,000 Capital Expenditures: Design - - - 6,000,000 6,000,000 Right of Way - - - - - Construction - - - - - - - - 6,000,000 6,000,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project will construct a new roadway corridor to bypass Auburn Way South. The new roadway will extend from Riverwalk Drive to R Street SE to the north of SR-18. A new connection to a new interchange with SR-18. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $25,000. City of Auburn Capital Facilities Plan 60 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 29th St SE/R St SE Intersection Improvements TIP # 63 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 16, 27 Activity: (Previous Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 1,300,000 - - 1,300,000 Traffic Impact Fees - 500,000 - - 500,000 REET - - - - - Other - - - - - - 1,800,000 - - 1,800,000 Capital Expenditures: Design - 350,000 - - 350,000 Right of Way - 450,000 - - 450,000 Construction - 1,000,000 - - 1,000,000 - 1,800,000 - - 1,800,000 Grants / Other Sources: Description: This project funds the design, right-of-way acquisition and construction of intersection capacity and safety improvements at the 29th St SE/R St SE intersection. This project will include creating eastbound/westbound dual left-turn lanes, auxiliary signal heads and pedestrian safety enhancements. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 61 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Lea Hill Rd Segment 1 (R St NE to 105th Pl SE) TIP # 64 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: (Previous Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - 600,000 150,000 - 750,000 Other - - - - - - 600,000 150,000 - 750,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - 600,000 - - 600,000 Construction - - - - - - 600,000 150,000 - 750,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - Grants- Unsecured (Fed,State,Local)- 1,950,000 8,000,000 - 9,950,000 Traffic Impact Fees - 500,000 2,000,000 - 2,650,000 Other - - - - - - 2,450,000 10,000,000 - 12,600,000 Capital Expenditures: Design - 1,950,000 - - 2,100,000 Right of Way - 500,000 - - 500,000 Construction - - 10,000,000 - 10,000,000 - 2,450,000 10,000,000 - 12,600,000 Grants / Other Sources: Description: Widen the existing roadway to provide a four-lane cross section pedestrian and bicycle facilities. The project includes widening the Green River Bridge. Progress Summary: Two parcels along the future roadway alignment were procured in 2014. Corridor pre-design effort is planned to begin in mid 2015 following adoption of the Comprehensive Transportation Plan major update. Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $18,300 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 62 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Lea Hill Rd Segment 2 (105th Pl SE to 112th Ave SE) TIP # 65 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - 2,900,000 7,100,000 10,000,000 Traffic Impact Fees - - 600,000 1,400,000 2,000,000 Other - - - - - - - 3,500,000 8,500,000 12,000,000 Capital Expenditures: Design - - 2,000,000 - 2,000,000 Right of Way - - 1,500,000 - 1,500,000 Construction - - 8,500,000 8,500,000 - - 3,500,000 8,500,000 12,000,000 Grants / Other Sources: Description: Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $24,100. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 63 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE ) TIP # 66 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - 3,000,000 - 3,000,000 Traffic Impact Fees - 1,000,000 - - 1,000,000 Other - - - - - 1,000,000 3,000,000 - 4,000,000 Capital Expenditures: Design - 500,000 - - 500,000 Right of Way - 500,000 - - 500,000 Construction - - 3,000,000 - 3,000,000 - 1,000,000 3,000,000 - 4,000,000 Grants / Other Sources: Description: Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $20,300. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 64 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: I Street NE and 22nd Street NE Roundabout Safety Improvement TIP # 69 Project No:cpxxx Project Type:Capacity (Safety) Project Manager:TBD LOS Corridor ID# 21 Activity: (Previous Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - 160,000 940,000 160,000 Traffic Impact Fees - - 40,000 235,000 40,000 REET2 - - - - - Other - - - - - - - 200,000 1,175,000 200,000 Capital Expenditures: Design - - 200,000 - 200,000 Right of Way - - - - - Construction - - - 1,175,000 - - - 200,000 1,175,000 200,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 1,100,000 Traffic Impact Fees - - - - 275,000 REET2 - - - - - Other - - - - - - - - - 1,375,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - 1,175,000 - - - - 1,375,000 Grants / Other Sources: Total Expenditures: Description: This project includes the design and construction of a roundabout at the 22nd Street NE intersection with I Street NE. This is currently a 4-way stop controlled intersection. Progress Summary: Multiple grant applications were submitted in May/July 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 65 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: West Valley Highway Improvements (SR-18 to 15th Street SW)TIP # 72 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 35 Activity: (Previous Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - 100,000 - 100,000 REET2 - - - - - Other - - - - - - - 100,000 - 100,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - - Construction - - - - - - - 100,000 - 100,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)400,000 2,000,000 - - 2,400,000 Traffic Impact Fees 100,000 500,000 - - 700,000 REET2 - - - - - Other - - - - - 500,000 2,500,000 - - 3,100,000 Capital Expenditures: Design 500,000 - - - 600,000 Right of Way - - - - - Construction - 2,500,000 - - 2,500,000 500,000 2,500,000 - - 3,100,000 Grants / Other Sources: Total Expenditures: Description: This project scope includes pavement rehabilitation and re-channelization, pedestrian and bicycle facility improvements, improved roadway lighting, required storm system improvements, intersection signal replacement at 15th St SW, and Intelligent Transportation System Improvements. Progress Summary: Survey, base mapping and pre-design are planned to be completed in 2015 to complete preliminary plans and refine project cost-estimate. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 66 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way Corridor (4th St NE to 4th St SE) TIP # 3 Project No:c409a0, cpxxxx Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# 2, 3 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 78,251 - - - 78,251 Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - 78,251 - - - 78,251 Capital Expenditures: Design 78,251 - - - 78,251 Right of Way - - - - - Construction - - - - - 78,251 - - - 78,251 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - 110,000 600,000 - 710,000 Grants- Unsecured (Fed,State,Local)- 708,700 2,400,000 - 3,108,700 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - 818,700 3,000,000 - 3,818,700 Capital Expenditures: Design - 618,700 - - 618,700 Right of Way - 200,000 - - 200,000 Construction - - 3,000,000 - 3,000,000 - 818,700 3,000,000 - 3,818,700 Grants / Other Sources: Description: This project is based on a pre-design study to improve pedestrian accessibility, appearance, and link the downtown area along Auburn Way South between 4th Street NE and 4th Street SE. The project may include some pavement repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in 2007. Although this was considered a temporary fix, the scope has been modified to account for the pavement work. The project is approximately 0.5 miles long. Progress Summary: The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 67 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way North/1st Street NE Signal Improvements TIP # 19 Project No:asbd05 Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# 2 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - 50,000 - 50,000 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue 125,000 - - - 175,000 Grants- Unsecured (Fed,State,Local)425,000 - - - 425,000 Traffic Impact Fees - - - - Other - - - - 550,000 - - - 600,000 Capital Expenditures: Design - - - - 50,000 Right of Way 100,000 - - - 100,000 Construction 450,000 - - - 450,000 550,000 - - - 600,000 Grants / Other Sources:Grant funds are unsecure. Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Description: This project will construct a new traffic signal with controller cabinet and battery backup along with necessary intersection improvements. Progress Summary: Design will be completed in 2015. Construction will be completed when funding is secured. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 68 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Main Street Signal Upgrades TIP # 21 Project No:cp1406 Project Type:Non-Capacity Project Manager:Seth Wickstrom LOS Corridor ID# 11 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - 315,000 5,000 - 320,000 Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - 150,000 - - 150,000 Other - - - - - - 465,000 5,000 - 470,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - 415,000 5,000 - 420,000 - 465,000 5,000 - 470,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Description: Reconstruct the existing traffic signals at C St NW and W Main St and at E Main St and Auburn Ave/A St SE. The new C St NW signal would provide protected left-turn phasing for C St, and would provide additional safety related to the railroad pre- emption. The Auburn Ave/A St signal would replace one of the City's oldest signals which has exceeded its design life. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 69 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: A Street SE Safety Improvements Study TIP # 27 Project No:cp1110 Project Type:Safety (Non-Capacity) Project Manager:James Webb LOS Corridor ID# 10,33 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 1,230 45,000 5,000 - 51,230 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - - - - Other - - - - - 1,230 45,000 5,000 - 51,230 Capital Expenditures: Design 1,230 45,000 5,000 - 51,230 Right of Way - - - - - Construction - - - - - 1,230 45,000 5,000 - 51,230 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - - - - - - 5,000 Grants / Other Sources: Description: Study the A Street SE corridor between 6th Street SE and Lakeland Hills Way SE including 41st St SE from D St SE to C St SE. The study will review the safety and access needs of the traveling public and the adjacent properties. Progress Summary: In-house pre-design will be done to refine project scope, alignment, and cost will be complete in 2013. 2014 design will complete detailed corridor plan for future improvements. Future Impact on Operating Budget: This study will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 70 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: S 277th Street - Wetland Mitigation TIP # 29 Project No:c410a0 Project Type:Non-Capacity Project Manager:Matt Larson LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 264,084 55,000 25,000 - 344,084 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 264,084 55,000 25,000 - 344,084 Capital Expenditures: Design 130,997 10,000 10,000 - 150,997 Right of Way - - - - - Construction 133,087 45,000 15,000 - 193,087 264,084 55,000 25,000 - 344,084 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - 25,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 15,000 - - - - 25,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: Wetland mitigation for the S 277th St grade separation project. Progress Summary: This is a 10-year obligation, which began in 2004. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 71 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Citywide Pedestrian Accessibility and Safety Program TIP # 30 Project No:asbd08 Project Type:Non-Capacity (Annual) Project Manager:Pablo Para LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - 100,000 100,000 100,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - 100,000 100,000 100,000 Capital Expenditures: Design - - 15,000 15,000 30,000 Right of Way - - - - - Construction - - 85,000 85,000 85,000 - - 100,000 100,000 115,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue 100,000 100,000 100,000 100,000 600,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design 15,000 15,000 15,000 15,000 90,000 Right of Way - - - - - Construction 85,000 85,000 85,000 85,000 510,000 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: Description: This is an annual program to fund pedestrian access and safety improvement projects at locations throughout the City. Projects are prioritized annually based on pedestrian demands, existing deficiencies, and citizen requests. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 72 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Citywide Arterial Bicycle & Safety Improvements TIP # 31 Project No:asbd07 Project Type:Non-Capacity (Safety) Project Manager:Various LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - 100,000 - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - 100,000 - Capital Expenditures: Design - - - 10,000 - Right of Way - - - - - Construction - - - 90,000 - - - - 100,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - 100,000 - 100,000 300,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - 100,000 - 100,000 300,000 Capital Expenditures: Design - 10,000 - 10,000 30,000 Right of Way - - - - - Construction - 90,000 - 90,000 270,000 - 100,000 - 100,000 300,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This is a bi-annual program to fund bicycle and safety improvements on classified roadways. Projects are prioritized annually based upon field studies. Project was previously called "Citywide Roadway Safety Infrastructure Improvements". Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 73 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 37th St NW & B St NW Railroad Crossing Safety Improvements TIP # 38 Project No:cp1304 STIP# AUB-43 Project Type:Intersection Safety (Non-Capacity) Project Manager:Jacob Sweeting LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 12,310 64,590 5,000 - 81,900 Grants- Secured (Fed,State,Local)22,112 285,438 - - 307,550 REET - - - - - Other - - - - - 34,422 350,028 5,000 - 389,450 Capital Expenditures: Design 34,422 50,000 - - 84,422 Right of Way - - - - - Construction - 300,028 5,000 - 305,028 34,422 350,028 5,000 - 389,450 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will fund the design and construction of a pre-signal at the 37th Street NW/B Street NW intersection adjacent to the at-grade BNSF rail crossing, and to mitigate impacts from the proposed BNSF third rail project. The project will include communication improvements and advanced train detection for new warning times for advanced railroad pre-emption at the signal. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. City of Auburn Capital Facilities Plan 74 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: A Street NE Pedestrian Improvements TIP # 44 Project No:cpxxxx Project Type:Sidewalk Improvements (Non-Capacity) Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - PWTFL - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 150,000 - - 150,000 REET - - - - - PWTFL - - - - - Other - - - - - - 150,000 - - 150,000 Capital Expenditures: Design - 15,000 - - 15,000 Right of Way - - - - - Construction - 135,000 - - 135,000 - 150,000 - - 150,000 Grants / Other Sources:Grant funds are unsecure. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project completes a pedestrian connection between Downtown Auburn and the 8th St NE business district. This project will improve a pedestrian crossing at 3rd St NE, and construct sidewalks/access ramps along the A St NE corridor. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. City of Auburn Capital Facilities Plan 75 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Interurban Trailhead Improvements TIP # 45 Project No:cpxxxx Project Type:Class 1 Trail (Non-Capacity) Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Mitigation Fees - - - - - PWTFL - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 210,000 - - 210,000 Traffic Mitigation Fees - - - - - PWTFL - - - - - Other - - - - - - 210,000 - - 210,000 Capital Expenditures: Design - 20,000 - - 20,000 Right of Way - - - - - Construction - 190,000 - - 190,000 - 210,000 - - 210,000 Grants / Other Sources:Grant funds are unsecure. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Description: This project provides enhancements to existing trailheads and construction of new trailheads. Improvements include bike racks, kiosks, parking and access. City of Auburn Capital Facilities Plan 76 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 104th Ave SE & Green River Road Study TIP # 46 Project No:cp1021 Project Type:Non-Capacity (Intersection Safety) Project Manager:James Webb LOS Corridor ID# 24 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 3,228 - 5,000 - 8,228 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - PWTFL - - - - - Other - - - - - 3,228 - 5,000 - 8,228 Capital Expenditures: Design 3,228 - 5,000 - 8,228 Right of Way - - - - - Construction - - - - - 3,228 - 5,000 - 8,228 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - PWTFL - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - - - - - - 5,000 Grants / Other Sources: Description: This project funds a pre-design study to determine the right-of-way, environmental and construction requirements for intersection safety improvements. The project is anticipated to include sight-distance improvements, constructing turn- lanes, channelization, environmental mitigation, signage and clear zone improvements. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 77 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: A St SE & 6th St SE Safety and Access Improvements TIP # 48 Project No:asbd09 Project Type:Non-Capacity Project Manager:James Webb LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - PWTFL - - - - - Other(BNSF)- - 50,000 - 50,000 - - 50,000 - 50,000 Capital Expenditures: Design - - 10,000 - 10,000 Right of Way - - - - - Construction - - 40,000 - 40,000 - - 50,000 - 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - PWTFL - - - - - Other(BNSF)- - - - 50,000 - - - - 50,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 40,000 - - - - 50,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project is a partnership between Auburn and Burlington Northern Santa Fe Railway to improve the intersection of A St SE and 6th St SE. The scope of the project includes adding a phase to the traffic signal for traffic entering and exiting the BNSF rail yard. Progress Summary: Design and construction is planned to be completed in 2015 pending agreement with BNSF. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 78 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: ITS Dynamic Message Signs TIP # 50 Project No:cpxxxx Project Type:Non-Capacity (ITS) Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - 15,000 - Grants- Unsecured Federal - - - 85,000 - REET - - - - - PWTFL - - - - - Other - - - - - - - - 100,000 - Capital Expenditures: Design - - - 10,000 - Right of Way - - - - - Construction - - - 90,000 - - - - 100,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue 30,000 30,000 - - 75,000 Grants- Unsecured Federal 170,000 170,000 - - 425,000 REET - - - - - PWTFL - - - - - Other - - - - - 200,000 200,000 - - 500,000 Capital Expenditures: Design 20,000 20,000 - - 50,000 Right of Way - - - - - Construction 180,000 180,000 - - 450,000 200,000 200,000 - - 500,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project funds the design and construction of Dynamic Message Signs at various locations throughout the City. Dynamic message signs are an important Intelligent Transportation System (ITS) tool for providing information to roadway users. Priority locations for sign placement are based on the Comprehensive Transportation Plans ITS map and include Auburn Way N, Auburn Way S, W Valley Highway, E Valley Highway and Lea Hill Road. Progress Summary: The first phase of this project is scheduled to begin in 2016 or sooner if grant funding becomes available. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. City of Auburn Capital Facilities Plan 79 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: AWS Streetscape Improvements (SR-18 to M St SE)TIP # 62 Project No:cpxxxx Project Type:Miscellaneous Project Manager:TBD LOS Corridor ID# 3 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - 200,000 200,000 - 400,000 Grants- Unsecured (Fed,State,Local)- 1,750,000 2,600,000 - 4,350,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - 1,950,000 2,800,000 - 4,750,000 Capital Expenditures: Design - 500,000 - - 500,000 Right of Way - 1,450,000 - - 1,450,000 Construction - - 2,800,000 - 2,800,000 - 1,950,000 2,800,000 - 4,750,000 Grants / Other Sources: Description: This project will revitalize and beautify AWS from the SR-18 interchange to the intersection with M Street SE. Proposed improvements include: enhancement of crosswalks and pedestrian linkages; new and repaired sidewalks; curb and gutter; pedestrian ramps; new landscaped medians; street trees; new lighting; pedestrian benches; trash receptacles; recycling containers and other appropriate amenities. A significant portion of project costs are associated with right-of-way acquisition. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $10,000. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 80 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Citywide Traffic Signal Safety Improvements TIP# 67 Project No:cp1222 STIP# AUB-45 Project Type:Non-Capacity Project Manager:Matt Larson LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue 6,916 55,000 5,000 - 66,916 Grants- Secured Federal 31,624 368,376 - - 400,000 Traffic Impact Fees - - - - - REET2 4,316 20,684 - - 25,000 Other - - - - - 42,856 444,060 5,000 - 491,916 Capital Expenditures: Design 41,075 - - - 41,075 Right of Way - - - - - Construction 1,781 444,060 5,000 - 450,841 42,856 444,060 5,000 - 491,916 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured Federal - - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Description: This project will improve traffic signal phasing and timing, improve visibility of traffic signal heads, install countdown pedestrian signal displays, and ADA pedestrian pushbuttons. Progress Summary: Grant funding was awarded June 2012 with no local match requirement. Project will be designed and constructed in 2013 and constructed in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 81 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 37th St SE & A St SE Traffic Signal Safety Improvement TIP # 68 Project No:asbd02 Project Type:Intersection Improvement, Non-capacity Project Manager:TBD LOS Corridor ID# 10 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Street Revenue - - 55,000 45,000 55,000 Grants- Unsecured Federal - - 121,400 440,000 121,400 Traffic Impact Fees - - - - - Other (Arterial Preserv. Fund 105)- - - 152,500 - - - 176,400 637,500 176,400 Capital Expenditures: Design - - 110,000 - 110,000 Right of Way - - 66,400 - 66,400 Construction - - - 637,500 - - - 176,400 637,500 176,400 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Street Revenue - - - - 100,000 Grants- Unsecured Federal - - - - 561,400 Traffic Impact Fees - - - - - Other (Arterial Preserv. Fund 105)- - - - 152,500 - - - - 813,900 Capital Expenditures: Design - - - - 110,000 Right of Way - - - - 66,400 Construction - - - - 637,500 - - - - 813,900 Grants / Other Sources:Other Funds are Fund 105 Arterial Preservation Funds Description: This project consists of the design, right of way acquisition and construction of a new traffic signal at 37th St SE & A St SE. Progress Summary: Grant application is being submitted in July 2014. Arterial Preservation Fund 105 will participate in this project to overlay portions of A St SE. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 82 TABLE T- 2A CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – LOCAL STREET 2015 2016 2017 2018 2019 2020 Total Capacity Projects: None - Non-Capacity Projects: 1 Local Street Improvement Program Capital Costs 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Funding Sources: Fund Balance 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Transfer In (W/S/SWM Utility)- - - - - - - Sales Tax on Construction - - - - - - - Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Total Costs 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 FUNDING SOURCES: Fund Balance 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Transfer In (W/S/SWM Utility)- - - - - - - Sales Tax on Construction - - - - - - - Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - Total Funding 2,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 City of Auburn Capital Facilities Plan 83 LOCAL STREET FUND (103)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Local Street Improvement Program TIP# 37 Project No:Various Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: (Previous 2Yrs.)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Local Street Fund 4,162,733 2,545,396 2,600,000 1,600,000 9,308,129 Transfer In - - - - - Property Tax - - - - - Sales Tax on Construction - - - - - Bond Proceeds - - - - - Other - - - - - 4,162,733 2,545,396 2,600,000 1,600,000 9,308,129 Capital Expenditures: Design 453,750 400,000 400,000 300,000 1,253,750 Right of Way - - - - - Construction 3,708,983 2,145,396 2,200,000 1,300,000 9,354,379 4,162,733 2,545,396 2,600,000 1,600,000 9,308,129 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Local Street Fund 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Transfer In - - - - - Property Tax - - - - - Sales Tax on Construction - - - - - Bond Proceeds - - - - - Other - - - - - 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Capital Expenditures: Design 300,000 300,000 300,000 300,000 1,900,000 Right of Way - - - - - Construction 1,300,000 1,300,000 1,300,000 1,300,000 8,700,000 1,600,000 1,600,000 1,600,000 1,600,000 10,600,000 Grants / Other Sources: 2015-2019 Sales tax is increased by 1% per year Description: The program preserves local (unclassified) streets. The work includes crack sealing, asphalt patching, pre-leveling, asphalt overlays and roadway reconstruction. Beginning in 2013 funding sources include annual sales tax on construction. Progress Summary: This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on reconstruction in 2015 and 2016. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 84 TABLE T- 2B CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – STREET PRESERVATION 2015 2016 2017 2018 2019 2020 Total Capacity Projects: None - Non-Capacity Projects: 1 15th Street SW Reconstruction Capital Costs - - 375,000 3,000,000 - - 3,375,000 Fund Balance - - - - - - - Utility Tax - - 75,000 500,000 - - 575,000 Grants - - 300,000 2,500,000 - - 2,800,000 Bond Proceeds - - - - - - - 2 Lake Tapps Parkway Preservation Capital Costs - 124,380 828,470 - - - 952,850 Funding Sources: Fund Balance - - - - - - - Grants - 97,900 652,100 - - - 750,000 Utility Tax - 26,480 176,370 - - - 202,850 3 Annual Arterial Street Preservation Program Capital Costs 1,700,000 600,000 700,000 1,250,000 1,800,000 1,800,000 7,850,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 1,700,000 600,000 700,000 1,250,000 1,800,000 1,800,000 7,850,000 Bond Proceeds - - - - - - - 4 Annual Arterial Crack Seal Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 100,000 100,000 100,000 100,000 100,000 100,000 600,000 5 Auburn Way N Preservation (22nd Street NE to 45th Street NE) Capital Costs 160,000 1,775,000 - - - - 1,935,000 Funding Sources: Fund Balance 80,000 - - - - - 80,000 Utility Tax - 887,500 - - - - 887,500 Grants 80,000 887,500 - - - - 967,500 6 15th Street NE/NW Preservation (SR-167 to 8th Street NE) Capital Costs - 135,000 1,500,000 - - - 1,635,000 Funding Sources: Fund Balance - - - - - - - Utility Tax - 67,500 750,000 - - - 817,500 Grants - 67,500 750,000 - - - 817,500 Note: Financial plan utilizes the following order for use of funds to finance projects: grant revenues (if available), utility tax revenues and fund balance. SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 1,960,000 2,734,380 3,503,470 4,350,000 1,900,000 1,900,000 16,347,850 Total Costs 1,960,000 2,734,380 3,503,470 4,350,000 1,900,000 1,900,000 16,347,850 FUNDING SOURCES: Fund Balance 80,000 - - - - - 80,000 Utility Tax 1,800,000 1,681,480 1,801,370 1,850,000 1,900,000 1,900,000 10,932,850 Grants 80,000 1,052,900 1,702,100 2,500,000 - - 5,335,000 Bond Proceeds - - - - - - - Total Funding 1,960,000 2,734,380 3,503,470 4,350,000 1,900,000 1,900,000 16,347,850 City of Auburn Capital Facilities Plan 85 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 15th Street SW Reconstruction TIP # 7 Project No:cpxxxx Project Type:Preservation Project Manager:TBD LOS Corridor ID# 12 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Utility Tax - - - - - Traffic Mitigation Funds - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)300,000 2,500,000 - - 2,800,000 Utility Tax 75,000 500,000 - - 575,000 Traffic Mitigation Funds - - - - - Bond Proceeds - - - - - 375,000 3,000,000 - - 3,375,000 Capital Expenditures: Design 375,000 - - - 375,000 Right of Way - - - - - Construction - 3,000,000 - - 3,000,000 375,000 3,000,000 - - 3,375,000 Grants / Other Sources: Description: This project will evaluate improvements to the Union Pacific at-grade rail-crossings as well as the vertical sight distance to the Interurban Trail crossing to the west of the tracks. This project could include pavement preservation and may be accomplished through the Pavement Preservation Program. A cost estimate for planning purposes is provided below. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 86 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Funds Project Title: Lake Tapps Parkway Preservation TIP #22 Project No:cpxxx STIP# AUB-TBD Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# 17 Activity: (Previous Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund Balance - - - - - Grants- Secured Federal - - - 97,900 - Utility Tax - - - 26,480 - REET2 - - - - - Bond Proceeds - - - - - - - - 124,380 - Capital Expenditures: Design - - - - - Right of Way - - - 124,380 - Construction - - - - - - - - 124,380 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund Balance - - - - - Grants- Secured Federal 652,100 - - - 750,000 Utility Tax 176,370 - - - 202,850 REET2 - - - - - Bond Proceeds - - - - - 828,470 - - - 952,850 Capital Expenditures: Design - - - - - Right of Way - - - - 124,380 Construction 828,470 - - - 828,470 828,470 - - - 952,850 Grants / Other Sources: Description: The Lake Tapps Parkway Preservation project will complete a patch and overlay of pavement between the Auburn/Sumner City limit and Lakeland Hills Way including all required ADA improvements to curb ramps, sidewalks, and pedestrian signals. Progress Summary: Federal Grant was secured in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 87 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Funds Project Title: Annual Arterial Street Preservation Program TIP #35 Project No:cp1302 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: (Previous 2Yrs.)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund - 701,799 - - 701,799 Property Tax - - - - - Utility Tax 1,367,984 1,918,780 1,700,000 600,000 4,986,764 REET2 - - - - - Bond Proceeds - - - - - 1,367,984 2,620,579 1,700,000 600,000 5,688,563 Capital Expenditures: Design 38,838 100,000 50,000 50,000 238,838 Right of Way - - - - - Construction 1,329,146 2,520,579 1,650,000 550,000 6,049,725 1,367,984 2,620,579 1,700,000 600,000 5,688,563 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund - - - - - Property Tax - - - - - Utility Tax 700,000 1,250,000 1,800,000 1,800,000 7,850,000 REET2 - - - - - Bond Proceeds - - - - - 700,000 1,250,000 1,800,000 1,800,000 7,850,000 Capital Expenditures: Design 50,000 50,000 50,000 50,000 300,000 Right of Way - - - - - Construction 650,000 1,200,000 1,750,000 1,750,000 7,550,000 700,000 1,250,000 1,800,000 1,800,000 7,850,000 Grants / Other Sources: Description: Implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These projects may include a combination of overlays, rebuilds, and spot repairs. This program is funded through a 1% utility tax that was adopted by City Council during 2008. Progress Summary: Program continues to successfully complete annual patching and overlay projects citywide. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 88 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Funds Project Title: Annual Arterial Crack Seal Program TIP #36 Project No:varies Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund - - - - - Utility Tax - 100,000 100,000 100,000 200,000 REET - - - - - Bond proceeds - - - - - - 100,000 100,000 100,000 200,000 Capital Expenditures: Design - 10,000 10,000 10,000 20,000 Right of Way - - - - - Construction - 90,000 90,000 90,000 180,000 - 100,000 100,000 100,000 200,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund - - - - - Utility Tax 100,000 100,000 100,000 100,000 600,000 REET - - - - - Bond proceeds - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 Right of Way - - - - - Construction 90,000 90,000 90,000 90,000 540,000 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Description: Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing the cracks will prolong the life of the pavement by stopping water from draining into the sub-base of the road. Progress Summary: Program continues to successfully extend pavement life pavement citywide. Future Impact on Operating Budget: There is no impact to the street maintenance budget. City of Auburn Capital Facilities Plan 89 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: Auburn Way N Preservation (22nd Street NE to 45th Street NE)TIP # 70 Project No:cpxxxx Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# 21 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund - - 80,000 887,500 80,000 Grants- Secured Federal - - 80,000 887,500 80,000 REET - - - - - Bond proceeds - - - - - - - 160,000 1,775,000 160,000 Capital Expenditures: Design - - 160,000 - 160,000 Right of Way - - - - - Construction - - 1,775,000 - - - 160,000 1,775,000 160,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund - - - - 967,500 Grants- Secured Federal - - - - 967,500 REET - - - - - Bond proceeds - - - - - - - - - 1,935,000 Capital Expenditures: Design - - - - 160,000 Right of Way - - - - - Construction - - - - 1,775,000 - - - - 1,935,000 Grants / Other Sources: Description: The project proposes to grind and overlay Auburn Way N from the 22nd Street NE to 45th Street NE. The project will restore 7.3 lane miles of pavement, upgrade 26 curb ramps to meet current ADA standard, as we as remove unused driveway openings as an upgrade to non ADA compliant pedestrian facilities. The project funds the design, coordination, permitting, and construction of the pavement preservation project. Progress Summary: Federal grant was secured in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 90 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund Project Title: 15th Street NE/NW Preservation (SR-167 to 8th Street NE)TIP # 71 Project No:cpxxxx Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# 9 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Arterial Preservation Fund - - - - - Grants- Secured Federal - - - 67,500 - Utility Tax - - - 67,500 - Bond proceeds - - - - - - - - 135,000 - Capital Expenditures: Design - - - 135,000 135,000 Right of Way - - - - - Construction - - - - - - - - 135,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Arterial Preservation Fund - - - - - Grants- Secured Federal 750,000 - - - 817,500 Utility Tax 750,000 - - - 817,500 Bond proceeds - - - - - 1,500,000 - - - 1,635,000 Capital Expenditures: Design - - - - 135,000 Right of Way - - - - - Construction 1,500,000 - - - 1,500,000 1,500,000 - - - 1,635,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project proposes to grind and overlay 15th Street NW/NE from the SR167 to Auburn Way N; and grind and overlay Harvey Road NE from Auburn Way N to 8th Street NE. The project will restore 7.57 lane miles of pavement, upgrade 30 curb ramps to meet current ADA standard, as well as remove unused driveway openings as an upgrade to non ADA compliant pedestrian facilities. The project funds the design, coordination, permitting, and construction of the pavement preservation project. Progress Summary: Federal grant was secured in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. City of Auburn Capital Facilities Plan 91 TABLE T-3 SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS Project:2016 2017 2018 2019 2020 2021 Total 1 A Street NW, Phase 1 25,830$ 25,830$ 25,830$ 25,830$ 25,830$ 25,830$ 154,980$ 2 AWS Pedestrian Imp.-Dogwood to Fir - - - - - - - 3 M Street Underpass 21,827 21,827 21,827 21,827 21,827 21,827 130,962 4 S 277th St Corridor Capacity 27,250 27,250 27,250 27,250 27,250 27,250 163,500 5 F Street SE, Downtown to Les Gove - - 4,100 4,100 4,100 4,100 16,400 6 M Street NE, E. Main to 4th - - - 1,500 1,500 1,500 4,500 7 M St SE & 12th St SE Traffic Signal - - - 6,600 6,600 6,600 19,800 8 8th Street NE Widening - - - - - - - 9 Harvey & 8th Street NE - - - - - - - 10 8th Street NE & SE 104th St Imp.6,600 6,600 6,600 6,600 6,600 6,600 39,600 11 Auburn Way S & M Street SE Imp.- - - - - - - 12 A St SE Non-motorized Access Imp.2,500 2,500 2,500 2,500 2,500 2,500 15,000 13 Academy Drive Multi-Use Trail - - - - 5,000 5,000 10,000 14 46th Place S Realignment - - - - - 1,750 1,750 15 BNSF 3rd Rail Expansion Rdwy Imp.- - - - - - - 16 124th Ave SE Corridor & 320th Imp.- - - - - - - 17 124th Ave SE Corridor Imp. -Phase 2 - - - - - - - 18 R Street Bypass - - - - - 2,500 2,500 19 SE 320th St Corridor Imp.- - - - - - - 20 AWS Corridor Safety Improvements - - - - - - - 21 Traffic Management Center Imp.- - - - - - - 22 W Valley Hwy Imp.-15th St NW to W Main St.- - - - - - - 23 Lake Tapps Pkwy ITS Expansion 5,000 5,000 5,000 5,000 5,000 5,000 30,000 24 AWS & 12th St SE Intersection Imp.- - - - - - - 25 Kersey Way Study - - - - - - - 26 W Main Street Improvements - - - - - - - 27 Evergreen Heights Safe Routes to School Imp.- - - - - - - 28 AWS Fir St SE to Hemlock St SE 9,300 9,300 9,300 9,300 9,300 9,300 55,800 29 Auburn Ave NE & 3rd St NE Pedestrian Improvements - - - - - - - 30 M St SE Corridor, 8th St SE to AWS - - - - 8,000 8,000 16,000 31 AWS Bypass-Riverwalk Dr. to SR 18 - - - - - 25,000 25,000 32 29th Street SE & R Street SE - - - - - - - 33 Lea Hill RD Segment 1 - - - - 18,300 18,300 36,600 34 Lea Hill Rd Segment 2 - - - - - 24,100 24,100 35 Lea Hill Rd Segment 3 - - - - 20,300 20,300 40,600 36 I St NE & 22nd St NE Roundabout - - - - - - - 37 WVHwy Imp.SR-18 to 15th St SW - - - - - - - 38 Auburn Way Corridor Imp - - - - - - - 39 Auburn Way N/1st St NE Signal Imp - - - - - - - 40 Main Street Signal Upgrades - - - - - - - 41 A Street SE Safety Imp. Study - - - - - - - 42 S. 277th Wetland Mitigation - - - - - - - 43 Citywide Pedestrian Crossing - - - - - - - 44 Citywide Arterial Bicycle & Safety Imp - - - - - - - 45 37th & B St NW Railroad Crossing Safety Imp 2,500 2,500 2,500 2,500 2,500 2,500 15,000 46 A St NE Pedestrian Imp - - - 500 500 500 1,500 47 Interurban Trailhead Imp - - - - - - - 48 104th Ave SE & Green River Rd Study - - - - - - - 49 A St SE & 6th St SE Safety Imp.- - - - - - - 50 ITS Dynamic Message Signs - - - 5,000 5,000 5,000 15,000 51 AWS Streetscape Improvements - - - - 10,000 10,000 20,000 52 Citywide Traffic Signal Safety Imp.- - - - - - - 53 37th St SE & A St SE Traffic Signal - 2,500 2,500 2,500 2,500 2,500 12,500 54 Local Street Improvement Program (Fund 103)- - - - - - - 55 15th Street SW Reconstruction - - - - - - - 56 Lake Tapps Parkway Preservation - - - - - - - 57 Arterial St. Preservation (Fund 105)- - - - - - - 58 Arterial Crack Seal Prog. (Fund 105)- - - - - - - 59 Auburn Wy N Preservation - - - - - - - 60 15th St NE/NW Preservation - - - - - - - Total 100,807$ 103,307$ 107,407$ 121,007$ 182,607$ 235,957$ 851,092$ City of Auburn Capital Facilities Plan 92 City of Auburn Capital Facilities Plan 93 WATER Current Facilities The City of Auburn water utility provides water supply, treatment, transmission, storage, distribution, and service connections to in-City residences and businesses. The City also provides water to the City of Algona and Water District #111 under wholesale agreements. The water system consists of wells, springs and interties for source; chlorination stations and corrosion control for treatment; pump stations, pressure reducing stations and pipelines for transmission; and steel and concrete enclosed reservoirs for storage. Table W-1, “Facilities Inventory”, lists the facilities along with their current capacities and approximate locations. Level of Service (LOS) The City’s Comprehensive Water Plan summarizes the design criteria and service polices for the City’s water distribution system. Capital Facilities Projects and Financing The City of Auburn’s water system anticipates five capacity projects in the amount of $9,387,170 and twenty-three non-capacity projects totaling $21,444,895 for a 6-year planning expectation total of $30,832,065. The financing plan is shown in Table W-2 followed by individual worksheets showing the project details. The capacity projects will increase water supply quantities, storage, and distribution for growth of retail customers. The non-capacity projects will provide for pipeline improvements and replacements, delivery pressure improvements, water quality enhancements, comprehensive and resource management planning, pump station upgrades, telemetry system improvements, and meter upgrades. Impact on Future Operating Budgets As Table W-3 shows, operating budget impacts of $16,200 are forecasted for water supply and distribution facilities during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 94 TABLE W-1 Facilities Inventory Water Facilities CAPACITY FACILITY WATER RIGHT (MGD - max rate)LOCATION Water Supply: Coal Creek Springs Certificate 857 9.70<2.52>*3401 Stuck River Rd Well 1 Certificate 3560-A 3.17 1136 M St SE Well 2 G1-00277 C 3.46 1109 5th St NE Well 3A G1-23629 C 4.03 401 37th St SE Well 3B (Included Above)(Included Above)401 37th St SE Well 4 G1-20391 C 4.03 950 25th St SE Well 5 G1-23633 C 1.44 5530 James Ave SE Well 5A (Included Above)(Included Above)5401 Olive Way SE Well 5B (Included Above)(Included Above)West end of 62nd Ct SE Well 6 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)1109 5th St NE Well 7 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)405 E St NE West Hill Springs Claim (1973 File Date)0.9 1900 15th St NW Ext Supply Total (MGD)26.73 Available for Use 24.21 * Denotes deduction of 1,750 gpm (Qi/2,824 ac-ft/yr) to comply with the provisions of the Muckleshoot-Auburn Stipulated Agreement. CAPACITY FACILITY (MGD)LOCATION SERVICE AREA Intertie Tacoma B Street NW 3.2 3240 B St NW Valley Service Area Tacoma 132nd Ave SE 3.2 29598 132nd Ave SE Lea Hill Service Area Intertie Total (MGD)6.4 CAPACITY FACILITY (MG)LOCATION SERVICE AREA Storage Facilities: Academy Reservoir 8A 1.0 5031 Auburn Way S Academy Service Area Academy Reservoir 8B 1.5 5031 Auburn Way S Academy Service Area Lakeland Hills Reservoir 5 1.0 1326 57th Dr SE Lakeland Hills Svc Area Lakeland Hills Reservoir 6 1.0 5718 Francis Ct SE Lakeland Hills Svc Area Lea Hill Reservoir 4A 1.0 30502 132nd Ave SE Lea Hill Service Area Lea Hill Reservoir 4B 1.5 30502 132nd Ave SE Lea Hill Service Area Valley Reservoir 1 5.0 2003 Auburn Way S Valley Service Area Valley Reservoir 2 3.6 32115 105th Place S Valley Service Area Storage Total (MG)15.6 CITY OF AUBURN WATER SYSTEM City of Auburn Capital Facilities Plan 95 TABLE W-1 (continued) Facilities Inventory Water Facilities CAPACITY FACILITY (GPM)LOCATION Booster Pump Stations: Academy 1: 2 pumps 800 2004 Auburn Way S Academy 2: 2 pumps 1,500 2004 Auburn Way S Academy East: 6 pumps 2,820 5031 Auburn Way S Green River: 4 pumps 4,680 29621 Green River Rd SE Intertie: 7 pumps 4,830 30502 132nd Ave SE Lea Hill: 3 pumps 2,100 10406 Lea Hill Rd SE Lakeland Hills: 5 pumps 3,200 1118 57th Place SE Wilderness Game Farm Pk: 2 pumps 1,050 2401 Stuck River Rd Terrace View: 3 pumps 1,500 6134 Alexander Place SE CAPACITY Primary Valve FACILITY (PSI - Inlet/Outlet)LOCATION Pressure Reducing Stations: Serves Valley Pressure Zone: Howard Road CCF #1011-10 82/65 Howard Rd Howard Road CCF By-Pass #1011-20 -Howard Rd (Bypass) 25th Street SE #1110-10 (Offline)-25th St SE & K St SE Riverwalk #1111-20 90/50 27th St. SE & 27th Place SE Riverwalk #1111-10 109/55 Riverwalk Dr SE & Howard Rd Serves Lea Hill: Amber View North #711-10 150/65 105th Pl SE & 320th Pl Amber View South #711-20 142/60 106th Pl SE Near Reservoir 2 Carriage Square Lower #611-10 165/65 Lea Hill Rd SE Carriage Square Middle #611-20 140/65 Lea Hill Rd & 106 Pl Carriage Square Upper #611-30 145/60 Lea Hill Rd & 107 Pl Cobble Creek Lower #411-20 86/40 SE 304th Pl & SE 101st Place Cobble Creek Upper #411-10 94/55 104th Ave SE (South of 303rd Road) Lea Hill #412-10 90/45 SE 298th Place & 109 Ave SE Lea Hill #412-30 N/C 300 Block & 108th Ave SE Lea Hill #511-10 87/45 304th St. SE West of 108th Ave Lea Hill #512-10 80/50 304th St. SE West of 112th Ave Serves Academy: Auburn Way South #1011-30 130/80 2003 Auburn Way S Auburn Way South #1114-10 130/80 4500 Auburn Way S Serves Jannsen Addition: Jannsen #1216-10 72/58 6100 Block & 35th Way SE TABLE W-1 (continued) City of Auburn Capital Facilities Plan 96 Facilities Inventory Water Facilities CAPACITY Primary Valve FACILITY (PSI - Inlet/Outlet)LOCATION Serves Lakeland Hills: Lakeland Hills #1309-10 105/55 Mill Pond Dr @ Oravetz Rd Lakeland Hills #1310-10 130/55 Mill Pond Dr & Mill Pond Loop Lakeland Hills #1409-10 N/C Oravetz & Lakeland Hills Way Lakeland Hills #1409-20 120/56 47th SE & Lakeland Hills Way Lakeland Hills #1409-30 95/70 Lakeland Hills Way & Lakeland Hills Lp Lakeland Hills #1409-40 84/55 Mill Pond Dr & Lakeland Hills Way Lakeland Hills #1410-10 103/50 4900 Block & Mill Pond Dr Lakeland Hills #1410-20 N/C 51st St. SE east of Mill Pond Loop Lakeland Hills #1410-30 125/62 Nathan Ave & Highland Dr Lakeland Hills #1410-40 82/55 Quincy Ave N of 53rd St SE Lakeland Hills #1411-10 80/42 Bennett Ave & 56th Ave SE Lakeland Hills #1411-20 82/55 5314 Bennett Ave SE Lakeland Hills #1411-30 155/73 5100 Kersey Way Lakeland Hills #1411-40 92/52 54th St SE Lakeland Hills #1411-50 85/44 Westly Ave SE Lakeland Hills #1412-10 82/55 5539 Franklin Ave SE Lakeland Hills #1509-10 174/60 Terrace View Lower (6170) Lakeland Hills #1509-20 160/73 Terrace View Middle (5960) Lakeland Hills #1509-30 138/47 Terrace View Upper (5810) Lakeland Hills #1509-40 230/90 Terrace View & Alexander Place SE Lakeland Hills #1510-10 N/C Lakeland Hills Way & Evergreen Way N/C - Normally Closed CAPACITY FACILITY (GPM)LOCATION Corrosion Control Howard Road 5,550 2101 Howard Rd SE Fulmer Field 9,375 1113 5th St NE Chlorination Stations: Coal Creek Springs Station 5,000 (gravity feed)3401 Stuck River Rd West Hill Springs Station 625 (gravity feed)1900 15th St NW Well 4 2,600 950 25th St SE Well 5B 600 1100 63rd St SE Well 5A 180 5401 Olive Ave SE FACILITY CAPACITY LOCATION Water Supply: Braunwood Satellite #1 0.03 MGD 4501 47th St SE Storage Facilities: Braunwood Satellite 1 0.03 MG 4501 47th St SE Booster Pump Stations: Braunwood: 3 Pumps 2.0 GPM 4501 47th St SE BRAUNWOOD SATELLITE WATER SYSTEM City of Auburn Capital Facilities Plan 97 TABLE W-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING WATER DIVISION 2015 2016 2017 2018 2019 2020 Total Capacity Projects: 1 Well 1 Improvements Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund 50,000 - - - - - 50,000 Bond Proceeds - - - - - - - 2 Fulmer Well Field Improvements Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 50,000 - - - - - 50,000 3 Cascade Water Alliance Water Purchase Capital Costs - - 532,560 532,560 532,560 2,164,490 3,762,170 Funding Sources: Water Fund - - 532,560 532,560 532,560 2,164,490 3,762,170 Bond Proceeds - - - - - - - 4 Academy Pump Station #1 Pump Repalcement Capital Costs - - 925,000 1,200,000 - - 2,125,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds - - 925,000 1,200,000 - - 2,125,000 5 Coal Creek Springs Rehabilitation Capital Costs - - - 800,000 2,600,000 - 3,400,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds - - - 800,000 2,600,000 - 3,400,000 Subtotal, Capacity Projects: Capital Costs 100,000 - 1,457,560 2,532,560 3,132,560 2,164,490 9,387,170 Non-Capacity Projects: 6 Green River PS Emergency Power Capital Costs - - 90,000 600,000 - - 690,000 Funding Sources: Water Fund - - 90,000 600,000 - - 690,000 Bond Proceeds - - - - - - - 7 Well 4 Power & Chlorination Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 50,000 - - - - - 50,000 8 Well Inspection and Redevelopment Program Capital Costs - - 150,000 - 150,000 - 300,000 Funding Sources: Water Fund - - 150,000 - 150,000 - 300,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 98 TABLE W-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 9 Water Repair & Replacements Capital Costs - - 200,000 1,700,000 260,000 1,900,000 4,060,000 Funding Sources: Water Fund - - - 1,700,000 260,000 1,900,000 3,860,000 Bond Proceeds - - 200,000 - - - 200,000 10 Lakeland Hills Reservoir 5 Improvements Capital Costs 735,000 - - - - - 735,000 Funding Sources: Water Fund 735,000 - - - - - 735,000 Bond Proceeds - - - - - - - 11 Comprehensive Water Plan Capital Costs 50,000 - - - - 425,000 475,000 Funding Sources: Water Fund 50,000 - - - - 425,000 475,000 Bond Proceeds - - - - - - - 12 MIT Master Meters Capital Costs 400,000 - - - - - 400,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 400,000 - - - - - 400,000 13 Street Utility Improvements Capital Costs 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 Funding Sources: Water Fund 150,000 100,000 500,000 500,000 500,000 500,000 2,250,000 Bond Proceeds 350,000 400,000 - - - - 750,000 14 Lea Hill PRV Station Improvements Capital Costs 50,000 400,000 - - - - 450,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 50,000 400,000 - - - - 450,000 15 Water Meter & Billing System Improvements Capital Costs 1,000,000 1,000,000 1,500,000 1,500,000 1,500,000 - 6,500,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 1,000,000 1,000,000 1,500,000 1,500,000 1,500,000 - 6,500,000 16 Utilities Field Operations Center Capital Costs 300,000 - - - - - 300,000 Funding Sources: Water Fund 100,000 - - - - - 100,000 Other -Sewer Fund 100,000 - - - - - 100,000 Other -Storm Fund 100,000 - - - - - 100,000 17 Valley AC Main Replace Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 50,000 - - - - - 50,000 City of Auburn Capital Facilities Plan 99 TABLE W-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 18 BNSF Utility Crossing Capital Costs 50,000 - - - - - 50,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 50,000 - - - - - 50,000 19 SCADA Upgrades Capital Costs 10,000 - - - - - 10,000 Funding Sources: Water Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - 20 West Hill Springs Improvements Capital Costs 455,000 - - - - - 455,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 455,000 - - - - - 455,000 21 Reservoir Seismic Rehabilitation Capital Costs - - 100,000 100,000 100,000 100,000 400,000 Funding Sources: Water Fund - - 100,000 100,000 100,000 100,000 400,000 Bond Proceeds - - - - - - - 22 Lea Hill - 132nd Ave Distribution System Modifications Capital Costs 400,000 - - - - - 400,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 400,000 - - - - - 400,000 23 Auburn Way South Flooding Improvements Phase 2 - 17th Street SE Capital Costs 850,000 - - - - - 850,000 Funding Sources: Water Fund 181,000 - - - - - 181,000 Bond Proceeds 669,000 - - - - - 669,000 24 Auburn Way South - Dogwood to Fir Capital Costs 34,895 - - - - - 34,895 Funding Sources: Water Fund 34,895 - - - - - 34,895 Bond Proceeds - - - - - - - 25 Auburn Way South - Fir to Hemlock Capital Costs 30,000 - - - - - 30,000 Funding Sources: Water Fund 30,000 - - - - - 30,000 Bond Proceeds - - - - - - - 26 Auburn Way South - Muckleshoot Plaza to Dogwood Capital Costs 55,000 - - - - - 55,000 Funding Sources: Water Fund 55,000 - - - - - 55,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 100 TABLE W-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 27 Reservoir Painting Capital Costs - - - - - 1,250,000 1,250,000 Funding Sources: Water Fund - - - - - 1,250,000 1,250,000 Bond Proceeds - - - - - - - 28 24" White River Crossing Capital Costs - 450,000 450,000 - - - 900,000 Funding Sources: Water Fund - - 450,000 - - - 450,000 Bond Proceeds - 450,000 - - - - 450,000 Subtotal, Non-Capacity Projects: Capital Costs 5,019,895 2,350,000 2,990,000 4,400,000 2,510,000 4,175,000 21,444,895 SUMMARY: CAPITAL COSTS Capacity Projects 100,000 - 1,457,560 2,532,560 3,132,560 2,164,490 9,387,170 Non-Capacity Projects 5,019,895 2,350,000 2,990,000 4,400,000 2,510,000 4,175,000 21,444,895 Total Costs 5,119,895 2,350,000 4,447,560 6,932,560 5,642,560 6,339,490 30,832,065 FUNDING SOURCES: Water Fund 1,395,895 100,000 1,822,560 3,432,560 1,542,560 6,339,490 14,633,065 Other- Sewer Fund 100,000 - - - - - 100,000 Other- Storm Fund 100,000 - - - - - 100,000 Bond Proceeds 3,524,000 2,250,000 2,625,000 3,500,000 4,100,000 - 15,999,000 Total Funding 5,119,895 2,350,000 4,447,560 6,932,560 5,642,560 6,339,490 30,832,065 City of Auburn Capital Facilities Plan 101 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Well 1 Improvements Project No:cp0915 Project Type:Capacity Project Manager:Sweeting Description: Progress Summary: Transmission main is complete. Future Impact on Operating Budget: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 1,829,988 1,437,913 50,000 - 3,317,901 Unrestricted Storm Revenue - - - - - Bond Proceeds - - - - - Other (PWTF loan)- 1,799,553 - - 1,799,553 Total Funding Sources:1,829,988 3,237,466 50,000 - 5,117,454 Capital Expenditures: Design 673,719 67,000 - - 740,719 Right of Way - - - - - Environmental 920 - - - 920 Construction 1,155,349 3,170,466 50,000 - 4,375,815 Total Expenditures:1,829,988 3,237,466 50,000 - 5,117,454 Forecasted Project Cost: Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 50,000 Unrestricted Storm Revenue - - - - - Bond Proceeds - - - - - Other (PWTF loan)- - - - - Total Funding Sources:- - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 Total Expenditures:- - - - 50,000 Grants / Other Sources: The annual maintenance cost is estimated to be approximately $1,800. Hydro geologic evaluation of existing well conditions, construction of transmission main to Howard Road Corrosion Control Treatment Facility for aeration, and construction of building improvements to house chlorine disinfection equipment and an emergency generator. Well improvements will bid in 2014 with construction completed in 2015. City of Auburn Capital Facilities Plan 102 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Fulmer Well Field Improvements Project No:cp1107 Project Type:Capacity Project Manager:Fenhaus / Vondrak Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 2,855 4,999 - - 7,854 Grants (Fed,State,Local)- - - - - Bond Proceeds 448,842 1,456,158 50,000 - 1,955,000 Other - - - - - 451,697 1,461,157 50,000 - 1,962,854 Capital Expenditures: Design 451,697 1,461,157 50,000 - 1,962,854 Right of Way - - - - - Construction - - - - - 451,697 1,461,157 50,000 - 1,962,854 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 50,000 Other - - - - - - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - - - - - 50,000 Grants / Other Sources: Evaluate Wells 2, 6 and 7 and the Fulmer Field Corrosion Control Treatment Facility to assess the supply and treatment capacity of the existing facilities and infrastructure. The evaluation will include an assessment of individual and total well supply capacities, along with a review of the treatment facility operating and control parameters. The evaluation will also incorporate recommendations for facility improvements. Progress Summary: Study is being conducted. Future Impact on Operating Budget: No significant impact. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 103 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Cascade Water Alliance Water Purchase Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Water Supply Charges - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 532,560 532,560 532,560 2,164,490 3,762,170 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 532,560 532,560 532,560 2,164,490 3,762,170 Capital Expenditures: Water Supply Charges 532,560 532,560 532,560 2,164,490 3,762,170 Right of Way - - - - - Construction - - - - - 532,560 532,560 532,560 2,164,490 3,762,170 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Financing to purchase water from adjacent purveyors to meet projected demand based on agreements with Cascade Water Alliance. Council approved the agreements for permanent and reserve wholesale supply in September 2013. Progress Summary: Planned Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 104 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Academy Pump Station #1 Pump Replacement Project No:cpXXXX Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds 925,000 1,200,000 - - 2,125,000 Other - - - - - 925,000 1,200,000 - - 2,125,000 Capital Expenditures: Design 325,000 - - - 325,000 Right of Way - - - - - Construction 600,000 1,200,000 - - 1,800,000 925,000 1,200,000 - - 2,125,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Increase the pump station capacity to meet peak demands and fire flow requirements. Progress Summary: Planned Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 105 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Coal Creek Springs Rehabilitation Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - 800,000 2,600,000 - 3,400,000 - 800,000 2,600,000 - 3,400,000 Capital Expenditures: Design - 500,000 - - 500,000 Right of Way - - - - - Construction - 300,000 2,600,000 - 2,900,000 - 800,000 2,600,000 - 3,400,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Rehabilitation of the Coal Creek Springs middle collector will improve capacity of the springs resulting in greater utilization of the water right. Progress Summary: Planned Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 106 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Green River Pump Station Emergency Power Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 90,000 600,000 - - 690,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 90,000 600,000 - - 690,000 Capital Expenditures: Design 90,000 - - - 90,000 Right of Way - - - - - Construction 600,000 - - 600,000 90,000 600,000 - - 690,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Construction of facility improvements to house an emergency generator and associated electrical equipment. Progress Summary: Planned Future Impact on Operating Budget: The annual maintenance cost is estimated to be approximately $600. City of Auburn Capital Facilities Plan 107 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Well 4 Power and Chlorination Project No:c512a0 Project Type:Non-Capacity Project Manager:Wickstrom Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 7,138 172,450 - - 179,588 Grants (Fed,State,Local)- - - - - Bond Proceeds 204,930 944,070 50,000 - 1,199,000 Other - - - 212,068 1,116,520 50,000 - 1,378,588 Capital Expenditures: Design 212,068 40,000 - - 252,068 Right of Way - - - - - Construction - 1,076,520 50,000 - 1,126,520 212,068 1,116,520 50,000 - 1,378,588 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 50,000 Other - - - - - - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Construct a new building at the Well 4 site to house a diesel-fueled standby generator and new hypochlorite disinfection equipment. Progress Summary: Design will be complete and project will bid in 2014 with construction completed in 2015. Future Impact on Operating Budget: The annual maintenance cost is estimated to be approximately $600. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 108 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Well Inspection and Redevelopment Program Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 150,000 - 150,000 - 300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 150,000 - 150,000 - 300,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 150,000 - 150,000 - 300,000 150,000 - 150,000 - 300,000 Grants / Other Sources: No significant impact. Program for inspection and redevelopment of supply wells and springs necessary to ensure production at maximum capacity for efficient utilization. Progress Summary: Planned Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 109 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Water Repair & Replacements Project No:cpxxxx Project Type:Non-Capacity (R&R) Project Manager:Various Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 70,000 - - 70,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 70,000 - - 70,000 Capital Expenditures: Design - 70,000 - - 70,000 Right of Way - - - - - Construction - - - - - - 70,000 - - 70,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - 1,700,000 260,000 1,900,000 3,860,000 Grants (Fed,State,Local)- - - - - Bond Proceeds 200,000 - - - 200,000 Other - - - - - 200,000 1,700,000 260,000 1,900,000 4,060,000 Capital Expenditures: Design 200,000 - 260,000 - 460,000 Right of Way - - - - - Construction - 1,700,000 - 1,900,000 3,600,000 200,000 1,700,000 260,000 1,900,000 4,060,000 Grants / Other Sources: Distribution system repair and replacement projects required for meeting peak demands and reducing system losses. Projects will be coordinated with the Local Street Program and other utility projects. Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 110 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Lakeland Hills Reservoir 5 Improvements Project No:cp0765 Project Type:Non-Capacity Project Manager:Larson Description: Progress Summary: No significant Impact Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 43,334 - 735,000 - 778,334 Grants (Fed,State,Local)- - - - - Bond Proceeds 5,664 744,336 - - 750,000 Other - - - - - Total Funding Sources:48,998 744,336 735,000 - 1,528,334 Capital Expenditures: Design 48,998 96,000 - - 144,998 Right of Way - - - - - Construction - 648,336 735,000 - 1,383,336 Total Expenditures:48,998 744,336 735,000 - 1,528,334 Forecasted Project Cost: Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 735,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources:- - - - 735,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 735,000 Total Expenditures:- - - - 735,000 Grants / Other Sources: Bond proceeds from 2013 issuance. Paint the interior and exterior to preserve the life of the reservoir, add mixing equipment for improved water quality and safety improvements including seismic isolation valve and new ladder. Future Impact on Operating Budget: Design will be completed in 2014, with construction completed in 2015. City of Auburn Capital Facilities Plan 111 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Comprehensive Water Plan Project No:cp1403 Project Type:Non-Capacity Project Manager:Fenhaus Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 384,643 50,000 - 434,643 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 384,643 50,000 - 434,643 Capital Expenditures: Design - 384,643 50,000 - 434,643 Right of Way - - - - - Construction - - - - - - 384,643 50,000 - 434,643 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - 425,000 475,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 425,000 475,000 Capital Expenditures: Design - - - 425,000 475,000 Right of Way - - - - - Construction - - - - - - - - 425,000 475,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Update the Comprehensive Water Plan as required by Washington State Department of Health. Plan is updated every 6 years. Progress Summary: Submit draft report to Washington Department of Health before December 31, 2014 Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 112 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Muckleshoot Indian Tribe Master Meters Project No:cp1411 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 80,000 - - 80,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - 400,000 - 400,000 Other - - - - - - 80,000 400,000 - 480,000 Capital Expenditures: Design - 80,000 - - 80,000 Right of Way - - - - - Construction - - 400,000 400,000 - 80,000 400,000 - 480,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 400,000 Other - - - - - - - - - 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 400,000 - - - - 400,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Install master meters to Muckleshoot Indian Tribe properties to ease account administration. Progress Summary: Design of master meter stations completed in 2014 with construction in 2015. Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 113 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Street Utility Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Progress Summary: Planned No significant impact Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 500,000 150,000 100,000 650,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - 350,000 400,000 350,000 Other - - - - - Total Funding Sources:- 500,000 500,000 500,000 1,000,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 500,000 500,000 500,000 1,000,000 Total Expenditures:- 500,000 500,000 500,000 1,000,000 Forecasted Project Cost: Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 500,000 500,000 500,000 500,000 2,250,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 750,000 Other - - - - - Total Funding Sources:500,000 500,000 500,000 500,000 3,000,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 500,000 500,000 500,000 500,000 3,000,000 Total Expenditures:500,000 500,000 500,000 500,000 3,000,000 Grants / Other Sources: Water main improvements in coordination with the Save our Streets (SOS) program and general arterial street improvements. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 114 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Lea Hill PRV Station Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - 50,000 400,000 50,000 Other - - - - - - - 50,000 400,000 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - 400,000 - - - 50,000 400,000 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 450,000 Other - - - - - - - - - 450,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - 400,000 - - - - 450,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Replace pressure reducing valve stations in the Lea Hill area. Progress Summary: Planned Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 115 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Water Meter & Billing System Improvements Project No:cp1317 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds 25,753 50,247 1,000,000 1,000,000 1,076,000 Other - - - - - 25,753 50,247 1,000,000 1,000,000 1,076,000 Capital Expenditures: Design 25,753 50,247 24,000 - 100,000 Right of Way - - - - - Construction - - 976,000 1,000,000 976,000 25,753 50,247 1,000,000 1,000,000 1,076,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds 1,500,000 1,500,000 1,500,000 - 6,500,000 Other - - - - - 1,500,000 1,500,000 1,500,000 - 6,500,000 Capital Expenditures: Design - - - - 24,000 Right of Way - - - - - Construction 1,500,000 1,500,000 1,500,000 - 6,476,000 1,500,000 1,500,000 1,500,000 - 6,500,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Conduct a study to determine which recent improvements in automated metering technology, generally referred to as Advanced Metering Infrastructure (AMI), would best benefit the City and construct selected improvements. Benefits include more accurate meter reads, daily information for quicker detection of leaks, and improved efficiency of billing operations. Progress Summary: Study in progress. Installation of meters and metering infrastructure to begin in 2015 Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 116 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Utilities Field Operations Center Project No:cpXXXX Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - 100,000 100,000 Grants (Fed,State,Local)- - - - - Other operating - transfer in Sewer - - 100,000 - 100,000 Other operating - transfer in Storm - - 100,000 - 100,000 - - 300,000 - 300,000 Capital Expenditures: Design - - - - Right of Way - - - - Construction - - 300,000 300,000 - - 300,000 - 300,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Other operating - transfer in Sewer - - - - 100,000 Other operating - transfer in Storm - - - - 100,000 - - - - 300,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 300,000 - - - - 300,000 Grants / Other Sources: Construct building for utilities field staff use and storage of field equipment. Progress Summary: Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 117 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Valley AC Main Replacement Project No:CP1219 Project Type:Non-Capacity Project Manager:Truong Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds 74,254 1,345,746 50,000 - 1,470,000 74,254 1,345,746 50,000 - 1,470,000 Capital Expenditures: Design 74,254 60,000 - 134,254 Right of Way - - - Construction - 1,285,746 50,000 - 1,335,746 74,254 1,345,746 50,000 - 1,470,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 50,000 - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Bond proceeds from 2013 bond issuance. Distribution system repair and replacement project required for meeting peak demands and reducing system losses. Projects will replace AC Main in the Valley service area. Progress Summary: Design will be complete and project will bid in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 118 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: BNSF Utility Crossing Project No:cp1308 Project Type:Non-Capacity Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds 51,356 678,644 50,000 - 780,000 51,356 678,644 50,000 - 780,000 Capital Expenditures: Design 51,356 40,000 - 91,356 Right of Way - - - Construction - 638,644 50,000 - 688,644 51,356 678,644 50,000 - 780,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 50,000 - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Bond proceeds from 2013 bond issuance. Water main improvements required prior to BNSF rail expansion project. Progress Summary: The design phase will be completed in 2014 and construction to be completed in 2015. Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 119 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: SCADA Upgrades Project No:c524a0 Project Type:Non-Capacity (Improvements) Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 1,069,277 553,790 10,000 - 1,633,067 Grants (Fed,State,Local)- - - - - Bond Proceeds 1,744,778 - - - 1,744,778 Other - - - - - 2,814,055 553,790 10,000 - 3,377,845 Capital Expenditures: Design 193,711 - - - 193,711 Right of Way - - - - - Construction 2,620,344 553,790 10,000 - 3,184,134 2,814,055 553,790 10,000 - 3,377,845 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 10,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Bond proceeds from 2010 bond issuance. Total Expenditures: Upgrade the existing Supervisory Control and Data Acquisition (SCADA) system, also known as the Telemetry system, to replace obsolete components and allow for improved control of the water utility facilities. No significant impact. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Progress Summary: Telemetry upgrades are complete. Physical site improvements are in progress and will be completed in 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 120 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: West Hill Springs Improvements Project No:wabd04 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 150,000 - - 150,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - 455,000 - 455,000 - 150,000 455,000 - 605,000 Capital Expenditures: Design - 150,000 - - 150,000 Right of Way - - - - - Construction - - 455,000 - 455,000 - 150,000 455,000 - 605,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 455,000 - - - - 455,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 455,000 - - - - 455,000 Grants / Other Sources: Install flow control valve for automatic shutdown and upgrade disinfection system. This project was identified during the Department of Health Sanitary Survey as a health and safety concern. Progress Summary: Design will be complete and project will bid in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 121 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Reservoir Seismic Rehabilitation Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 100,000 100,000 100,000 100,000 400,000 Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - 100,000 100,000 100,000 100,000 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 100,000 100,000 100,000 400,000 100,000 100,000 100,000 100,000 400,000 Grants / Other Sources: Install seismic control valves on outlet piping of Reservoirs 1, 2, 4A, 4B, 8A, and 8B. Progress Summary: Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 122 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Lea Hill - 132nd Ave Distribution System Modifications Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - 400,000 - 400,000 - - 400,000 - 400,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - - - Construction - - 360,000 - 360,000 - - 400,000 - 400,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 400,000 - - - - 400,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 360,000 - - - - 400,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Project will add pressure reducing valve, control valves at Lea Hill reservoirs, and system valves to provide efficient operation of the 132nd Ave Tacoma Intertie. Progress Summary: Design and construction will be completed in 2015. Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 123 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South Flooding Improvements Phase 2 - 17th Street SE Project No:cp1202 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 50,000 181,000 - 231,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - 669,000 - 669,000 - 50,000 850,000 - 900,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - 850,000 - 850,000 - 50,000 850,000 - 900,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 181,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 669,000 - - - - 850,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 850,000 - - - - 850,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Project will replace water main along 17th Avenue SE in conjunction with flood improvements project. Progress Summary: Design will be completed in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 124 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South - Dogwood to Fir Project No:cp 1118 Project Type:Non-Capacity Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 5,144 20,000 34,895 - 60,039 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - 5,144 20,000 34,895 - 60,039 Capital Expenditures: Design 5,144 10,000 - - 15,144 Right of Way - - - - - Construction - 10,000 34,895 - 44,895 5,144 20,000 34,895 - 60,039 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 34,895 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 34,895 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 34,895 - - - - 34,895 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Water main improvements constructed in conjunction with Auburn Way South Corridor Improvements. Progress Summary: Design will be completed in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 125 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South - Fir to Hemlock Project No:cp 1119 Project Type:Non-Capacity Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue 3,907 5,000 30,000 - 38,907 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - 3,907 5,000 30,000 - 38,907 Capital Expenditures: Design 3,907 5,000 - - 8,907 Right of Way - - - - - Construction - - 30,000 - 30,000 3,907 5,000 30,000 - 38,907 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 30,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 30,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 30,000 - - - - 30,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Water main improvements constructed in conjunction with Auburn Way South Corridor Improvements. Progress Summary: Design will be completed in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 126 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South - Muckleshoot Plaza to Dogwood Project No:cp1218 Project Type:Non-Capacity Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - 5,000 55,000 - 60,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - 5,000 55,000 - 60,000 Capital Expenditures: Design - 5,000 - - 5,000 Right of Way - - - - - Construction - - 55,000 - 55,000 - 5,000 55,000 - 60,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - - 55,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 55,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 55,000 - - - - 55,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Water main improvements constructed in conjunction with Auburn Way South Corridor Improvements. Progress Summary: Design will be completed in 2014 with construction completed in 2015. Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 127 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Reservoir Painting Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue - - - 1,250,000 1,250,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - 1,250,000 1,250,000 Capital Expenditures: Design - - - 150,000 150,000 Right of Way - - - - - Construction - - - 1,100,000 1,100,000 - - - 1,250,000 1,250,000 Grants / Other Sources: Maintenance of reservoirs requires periodic painting to protect the steel and increase the useful life of the reservoir. Progress Summary: Planned Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 128 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: 24" White River Crossing Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - 450,000 - - - - 450,000 - Capital Expenditures: Design - - - 100,000 - Right of Way - - - - - Construction - - - 350,000 - - - - 450,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Water Revenue 450,000 - - - 450,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 450,000 450,000 - - - 900,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction 450,000 - - - 800,000 450,000 - - - 900,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The facilities evaluation study conducted in 2013-2014 found a suspected leak on the 24" steel transmission main crossing the White River. The approximate location was determined, but further investigation is required to assess the degree and magnitude of the leak. This project will provide for full replacement of the river crossing. Progress Summary: Design is anticipated to be completed in 2016 with construction completed in 2017. Future Impact on Operating Budget: No significant impact TABLE W-3 City of Auburn Capital Facilities Plan 129 Impact on Future Operating Budgets WATER Project:2016 2017 2018 2019 2020 2021 Total 1 Well 1 Improvements 1,800$ 1,800$ 1,800$ 1,800$ 1,800$ 1,800$ 10,800$ 2 Fulmer Well Field Improvements - - - - - - - 3 Cascade Water Alliance Water Purchase - - - - - - - 4 Academy Pump Station #1 Replacement - - - - - - - 5 Coal Creek Springs Rehabilitation - - - - - - - 6 Green River Pump Station Emergency Power - - - 600 600 600 1,800 7 Well 4 Power and Chlorination 600 600 600 600 600 600 3,600 8 Well Inspection and Redevelopment Program - - - - - - - 9 Water Repair & Replacement - - - - - - - 10 Lakeland Hills Reservoir 5 Improvements - - - - - - - 11 Comprehensive Water Plan - - - - - - - 12 MIT Master Meters - - - - - - - 13 Street Utility Improvements - - - - - - - 14 Lea Hill PRV Station Improvements - - - - - - - 15 Water Meter & Billing System Improvements - - - - - - - 16 Utilities Field Operations Center - - - - - - - 17 Valley AC Main Replacement - - - - - - - 18 BNSF Utility Crossing - - - - - - - 19 SCADA Upgrades - - - - - - - 20 West Hill Springs Improvement - - - - - - - 21 Reservoir Seismic Rehabilitation - - - - - - - 22 Lea Hill -132nd Ave Distribution System Modifications - - - - - - - 23 Auburn Way So Flooding Improvements Phase 2 - - - - - - - 24 Auburn Way South- Dogwood to Fir - - - - - - - 25 Auburn Way South- Fir to Hemlock - - - - - - - 26 Auburn Way South- Muckleshoot Plaza to Dogwood - - - - - - - 27 Reservoir Painting - - - - - - - 28 24" White River Crossing - - - - - - - Total 2,400$ 2,400$ 2,400$ 3,000$ 3,000$ 3,000$ 16,200$ City of Auburn Capital Facilities Plan 130 City of Auburn Capital Facilities Plan 131 SANITARY SEWER Current Facilities The City’s sanitary sewer service area encompasses approximately 28-square miles which are primarily within the City limits, but includes a total of approximately ½ square mile within Auburn’s Proposed Annexation area (PAA). The City contracts with King County for sewage treatment and disposal. The City’s Sanitary Sewer Utility is responsible for the collection and transmission of wastewater to the King County trunk lines. The City’s current inventory of approximately 197 miles of sewer lines serves the City’s sewer service area. Table S-1, Facilities Inventory, lists the sewage collection and transmission facilities along with their capacities and locations. Level of Service (LOS) The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level of service (LOS), or design criteria, for the City’s sewage collection system. These standards represent the average quantities of sewage that the system is designated to accommodate for residential, industrial, and commercial development. Capital Facilities Projects and Financing Investments in the City’s sewage collection facilities include primarily non-capacity improvements and replacement projects. Anticipated replacements include replacement of aging sewer pipes and manholes in conjunction with arterial and local street improvements, and replacement of pipe identified through the sewer program’s condition assessment process. Anticipated improvements include upgrades and additions to the utility’s maintenance facilities and the construction of a sewer decant facility. The City of Auburn’s sewer system anticipates costs for seven non-capacity projects totaling $11,345,160. Table S-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for sanitary sewer facilities during the six years 2026 – 2021. City of Auburn Capital Facilities Plan 132 TABLE S-1 Facilities Inventory Sewage Facilities CAPACITY FACILITY (MGD)LOCATION Pump Stations: 8th Street 0.26 900 8th Street NE 22nd Street 0.79 1950 22nd Street NE Area 19 0.47 800 71st Street SE Auburn 40 0.63 4159 O Place NE Dogwood 0.43 1423 Dogwood Street SE Ellingson 2.20 100 41st Street SE F Street 0.86 1700 F Street SE North Tapps 0.73 2610 Lake Tapps Pkwy SE Peasley Ridge 0.36 5225 South 320th Street R Street 0.14 600 R Street NE Rainier Ridge 0.29 31809 125th Place SE Riverside 0.58 13900 104th Avenue SE Terrace View 0.94 104 60th Street SE Valley Meadows 0.18 2022 4th Street SE Verdana 2.88 11807 SE 296th Place (Kent, WA) FACILITY Pipe Size LOCATION River Crossings: Inverted Syphon 8 & 12 Inch Green River & 26th Street NE 8th Street Bridge 14 Inch Green River & 8th Street NE City of Auburn Capital Facilities Plan 133 TABLE S-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING SANITARY SEWER DIVISION 2015 2016 2017 2018 2019 2020 Total Capacity Projects: None Non-Capacity Projects: 1 Sanitary Sewer Repair & Replacement Capital Costs 1,930,000 2,050,000 300,000 1,500,000 300,000 1,500,000 7,580,000 Funding Sources: Sewer Fund 1,930,000 2,050,000 300,000 1,500,000 300,000 1,500,000 7,580,000 Bond Proceeds - - - - - - - 2 Street Utility Improvements Capital Costs 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Funding Sources: Sewer Fund 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Bond Proceeds - - - - - - - 3 Vactor Decant Facility Capital Costs 30,000 240,000 - - - - 270,000 Funding Sources: Sewer Fund 30,000 240,000 - - - - 270,000 Bond Proceeds - - - - - - - 4 Comprehensive Sewer Plan Update Capital Costs 25,000 - - - - 350,000 375,000 Funding Sources: Sewer Fund 25,000 - - - - 350,000 375,000 Bond Proceeds - - - - - - - 5 Auburn Way South Flooding Improvement - Phase 2 Capital Costs 415,160 - - - - - 415,160 Funding Sources: Sewer Fund 415,160 - - - - - 415,160 Bond Proceeds - - - - - - - 6 BNSF Utility Crossings Capital Costs 5,000 - - - - - 5,000 Funding Sources: Sewer Fund 5,000 - - - - - 5,000 Bond Proceeds - - - - - - - 7 Sewer Pump Station Replacement/Improvement Capital Costs - - - - - 1,500,000 1,500,000 Funding Sources: Sewer Fund - - - - - 1,500,000 1,500,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 2,605,160 2,490,000 500,000 1,700,000 500,000 3,550,000 11,345,160 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 2,605,160 2,490,000 500,000 1,700,000 500,000 3,550,000 11,345,160 Total Costs 2,605,160 2,490,000 500,000 1,700,000 500,000 3,550,000 11,345,160 FUNDING SOURCES: Utility Funds (Sewer)2,605,160 2,490,000 500,000 1,700,000 500,000 3,550,000 11,345,160 Bond Proceeds - - - - - - - Other - - - - - - - Total Funding 2,605,160 2,490,000 500,000 1,700,000 500,000 3,550,000 11,345,160 City of Auburn Capital Facilities Plan 134 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Sanitary Sewer Repair & Replacement/System Improvements Project No:cpxxxx Project Type: Project Manager:Elwell Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue 1,285,681 420,502 1,930,000 2,050,000 3,636,183 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,285,681 420,502 1,930,000 2,050,000 3,636,183 Capital Expenditures: Design 192,852 100,000 290,000 307,500 582,852 Right of Way - - - - - Construction 1,092,829 320,502 1,640,000 1,742,500 3,053,331 1,285,681 420,502 1,930,000 2,050,000 3,636,183 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue 300,000 1,500,000 300,000 1,500,000 7,580,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 300,000 1,500,000 300,000 1,500,000 7,580,000 Capital Expenditures: Design 200,000 150,000 200,000 150,000 1,297,500 Right of Way - - - - - Construction 100,000 1,350,000 100,000 1,350,000 6,282,500 300,000 1,500,000 300,000 1,500,000 7,580,000 Grants / Other Sources: Non-Capacity (Repair and Replacement) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This should decrease the operating budget by correcting the problems that require operation staff's attention. Repair and replace broken sewer mains and other facilities. These lines will be identified through television inspection and routine cleaning. This particular program includes proposed projects which do not have an approved Project Management Plan, or are not associated with the SOS or other transportation improvements. Anticipated projects include bi-annual, stand-alone, repair and replacement projects for sewer lines which are broken, misaligned, "bellied" or otherwise require an inordinate amount of maintenance effort or present a risk of backup or trench failure, and facilities which generate consistent odor complaints. Additionally, system improvements which enhance the ability to maintain service are included here. Progress Summary: Anticipated projects for 2015-2020 include: 1. Manhole frame and cover replacements. 2. Biennial Repair and Replacement Projects. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 135 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Street Utility Improvements Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue 348,000 200,000 200,000 200,000 948,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 348,000 200,000 200,000 200,000 948,000 Capital Expenditures: Design 34,800 20,000 20,000 20,000 94,800 Right of Way - - - - - Construction 313,200 180,000 180,000 180,000 673,200 348,000 200,000 200,000 200,000 748,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue 200,000 200,000 200,000 200,000 1,200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 200,000 200,000 200,000 200,000 1,200,000 Capital Expenditures: Design 20,000 20,000 20,000 20,000 120,000 Right of Way - - - - - Construction 180,000 180,000 180,000 180,000 1,080,000 200,000 200,000 200,000 200,000 1,200,000 Grants / Other Sources: Non Capacity Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant Impact Sewer line replacement in coordination with the Save our Streets (SOS) program and Arterial improvements. Progress Summary: Ongoing Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 136 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Sewer Vactor Decant Facility Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue - - 30,000 240,000 30,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 30,000 240,000 30,000 Capital Expenditures: Design - - 15,000 30,000 15,000 Right of Way/Property Acquisition - - 15,000 - 15,000 Construction - - - 210,000 - - - 30,000 240,000 30,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue - - - - 270,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 270,000 Capital Expenditures: Design - - - - 45,000 Right of Way/Property Acquisition - - - - 15,000 Construction - - - - 210,000 - - - - 270,000 Grants / Other Sources: Non-Capacity (Improvements) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would decrease the future operating budget by reducing the expenses associated with hauling saturated waste to the County landfill. Funds allocated to construct a decant facility for sewer vactor waste. Progress Summary: Staff concluded that the use of an expanded decant building at the M&O facility to decant sewage was impractical, so alternative sites will be explored. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 137 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Comprehensive Sewer Plan Update Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue - 325,000 25,000 - 350,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 325,000 25,000 - 350,000 Capital Expenditures: Design - 325,000 25,000 - 350,000 Right of Way - - - - - Construction - - - - - - 325,000 25,000 - 350,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue - - - 350,000 375,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 350,000 375,000 Capital Expenditures: Design - - - 350,000 375,000 Right of Way - - - - - Construction - - - - - - - - 350,000 375,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: None Non-Capacity (Improvements) Update the Comprehensive Sewer Plan to be consistent with the City's overall Comprehensive Plan update as required by the State of Washington. Progress Summary: The City's consultant has completed preliminary work, and is preparing a draft document for approval early in 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 138 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South Flooding Improvement - Phase 2 Project No:CP1202 Project Type: Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue - 65,200 415,160 - 480,360 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 65,200 415,160 - 480,360 Capital Expenditures: Design - 65,200 - - 65,200 Right of Way - - - - - Construction - - 415,160 - 415,160 - 65,200 415,160 - 480,360 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue - - - - 415,160 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 415,160 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 415,160 - - - - 415,160 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: None Non Capacity Replace the City sewer main and portions of side sewers within the right-of-way in 17th Street SE in conjunction with storm drainage and water improvements. Progress Summary: The project is in design and is expected to be constructed in the Spring/Summer of 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 139 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: BNSF Utility Crossings Project No:CP1308 Project Type: Project Manager:Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue 14,440 356,500 5,000 - 375,940 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 14,440 356,500 5,000 - 375,940 Capital Expenditures: Design 14,440 15,000 - - 29,440 Right of Way - - - - - Construction - 341,500 5,000 - 346,500 14,440 356,500 5,000 - 375,940 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue - - - - 5,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: No significant impact. Non Capacity Replace one sewer main which crosses under the BNSF railroad tracks to ensure that it complies with pipeline casing requirements prior to the BNSF construction of a third track within their right-of-way. Progress Summary: The project is expected to be substantially constructed in 2014 and completed in early 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 140 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Sewer Pump Station Replacement/Improvement Project No:cpxxxx Project Type: Project Manager: Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Sewer Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Sewer Revenue - - - 1,500,000 1,500,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 1,500,000 1,500,000 Capital Expenditures: Design - - - 300,000 300,000 Right of Way - - - - - Construction - - - 1,200,000 1,200,000 - - - 1,500,000 1,500,000 Grants / Other Sources: The effect on future operation budget will be negligible. Capacity & Non-Capacity (Repair and Replacement/Improvements Project(s) to repair, upgrade, and/or replace existing pump stations. Stations anticipated to need upgrades during that time include: 1. The Valley Meadows Pump Station. 2. The 22nd Street Pump Station. 3. The 8th Street Pump Station. Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 141 STORM DRAINAGE Current Facilities The City’s storm drainage service area encompasses the municipal boundaries of the City. For management purposes the service area is divided into 60 drainage sub-basins. The City’s drainage system consists of a combination of closed conveyance pipes and open ditch conveyance facilities, with six pumping stations. Table SD-1 Facilities Inventory lists the facilities along with their current capacities and location. Level of Service (LOS) The City’s Comprehensive Drainage Plan summarizes the level of service (LOS), or design criteria, for the City’s storm drainage system. Generally, these standards represent a 25- year/24-hour design storm capacity within the 60 drainage sub-basins. Capital Facilities Projects and Financing The City’s storm drainage facilities anticipates four capacity projects in the amount of $1,433,600, 17 non-capacity projects totaling $13,276,442 for a six-year planning expectation total of $14,710,042. Table SD-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for storm drainage facilities during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 142 TABLE SD-1 Facilities Inventory Storm Drainage Facilities Feet of Feet of FACILITY Acres Pipeline Open Channels LOCATION Drainage Basins: A 562 36,300 1,200 See City of Auburn's AA 408 17,600 17,100 Comprehensive Drainage AAA 296 3,100 5,300 Plan, Dec. 2009 AZ 777 53,400 14,200 B 864 94,400 0 BB 15 1,700 0 BBB 73 0 0 C 836 75,900 5,600 CC 242 1,400 0 CCC 976 56,400 12,900 D 168 18,900 400 DD 231 0 0 DDD 61 4,000 0 E 692 59,400 19,400 EE 600 3,900 0 F 83 9,600 0 FF 411 3,600 900 G 137 18,800 0 GG 190 4,900 3,100 H 559 40,000 4,600 HH 392 0 0 HV 66 5,200 0 I 241 35,300 7,100 II 305 0 0 J 257 5,000 1,100 JJ 1,170 26,600 17,200 K 266 15,100 700 KK 391 0 0 L 87 12,900 600 LL 198 100 1,600 LS 1,138 48,800 0 M 553 32,400 9,900 MM 332 1,900 1,200 N 126 9,800 0 NN 588 11,100 900 NNN 175 400 0 O 176 16,900 3,600 OO 1,397 28,500 8,900 P 189 7,800 3,100 PP 110 1,600 0 PPP 161 3,400 4,500 QQ 334 11,400 3,300 CAPACITY City of Auburn Capital Facilities Plan 143 TABLE SD-1 (continued) Facilities Inventory Storm Drainage Facilities Feet of Feet of FACILITY Acres Pipeline Open Channels LOCATION R 55 7,200 0 RR 249 11,600 4,700 S 273 13,700 2,200 SS 333 20,900 2,700 T 699 78,300 1,400 TT 135 3,000 0 U 365 9,800 0 UU 453 14,200 700 V 598 19,700 10,100 W 287 30,300 2,400 WC 65 7,900 0 WW 71 1,100 500 X 40 3,600 0 YY 327 23,200 5,600 YYY 105 0 0 Z 70 9,700 0 ZZ 949 47,400 17,400 ZZZ 237 0 0 Total 22,144 1,079,100 196,100 FACILITY (GPM)LOCATION Pump Stations: White River Pump Station 17,700 5000 block A Street SE A Street SE Pump Station 1,380 A Street SE near SR-18 and BNRR overpass Auburn Way S Pump Station #3 1,000 Auburn Way S near SR-18 and BNRR overpass Brannan Park Pump Station #4 20,200 Brannan Park Emerald Corp. Park Pump Station 6,500 C Street NE near 42nd Street West Main Street Pump Station 1,200 1420 West Main Street CAPACITY City of Auburn Capital Facilities Plan 144 TABLE SD-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2015 2016 2017 2018 2019 2020 Total Capacity Projects: 1 Bypass at 2nd and G Street SE Capital Costs - - - - 50,000 493,600 543,600 Funding Sources: Storm Fund - - - - 50,000 493,600 543,600 Bond Proceeds - - - - - - - 2 M Street SE Storm Improvement Capital Costs 400,000 - - - - - 400,000 Funding Sources: Storm Fund 400,000 - - - - - 400,000 Bond Proceeds - - - - - - - 3 Howard Road Improvement Capital Costs 40,000 250,000 - - - - 290,000 Funding Sources: Storm Fund 40,000 250,000 - - - - 290,000 Bond Proceeds - - - - - - - 4 37th St. NW Storm Improvement Capital Costs 40,000 160,000 - - - - 200,000 Funding Sources: Storm Fund 40,000 160,000 - - - - 200,000 Bond Proceeds - - - - - - - 5 M &O Storm Drainage Improvements Capital Costs 840,050 - - - - - 840,050 Funding Sources: Storm Fund 305,080 - - - - - 305,080 Grants 9,887 - - - - - 9,887 Other (Water, Sewer, ERR)525,083 - - - - - 525,083 Subtotal, Capacity Projects: Capital Costs 1,320,050 410,000 - - 50,000 493,600 2,273,650 Non-Capacity Projects: 6 Pipeline Repair & Replacement Program Capital Costs 1,000,000 100,000 1,000,000 100,000 1,000,000 100,000 3,300,000 Funding Sources: Storm Fund 1,000,000 100,000 1,000,000 100,000 1,000,000 100,000 3,300,000 Bond Proceeds - - - - - - - 7 Auburn Way South Flooding, Phase 2 Capital Costs 1,482,392 - - - - - 1,482,392 Funding Sources: Storm Fund - - - - - - - Bond Proceeds 1,482,392 - - - - - 1,482,392 8 30th Street NE Area Flooding, Phase 1 Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 145 TABLE SD-2 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 9 30th Street NE Area Flooding, Phase 2 Capital Costs - 75,000 600,000 - - - 675,000 Funding Sources: Storm Fund - 75,000 600,000 - - - 675,000 Bond Proceeds - - - - - - - 10 30th Street NE Area Flooding, Phase 3 Capital Costs - - - 200,000 954,000 - 1,154,000 Funding Sources: Storm Fund - - - 200,000 954,000 - 1,154,000 Bond Proceeds - - - - - - - 11 West Main Street Pump Station Upgrade Capital Costs 125,000 985,000 - - - - 1,110,000 Funding Sources: Storm Fund 125,000 985,000 - - - - 1,110,000 Bond Proceeds - - - - - - - 12 Street Utility Improvements Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Storm Fund 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Bond Proceeds - - - - - - - 13 Comprehensive Storm Drainage Plan Update Capital Costs 10,000 - - - - 250,000 260,000 Funding Sources: Storm Fund 10,000 - - - - 250,000 260,000 Bond Proceeds - - - - - - - 14 Mill Creek Wetland 5K Reach Restoration Capital Costs 255,000 5,000 55,000 55,000 5,000 - 375,000 Funding Sources: Storm Fund 5,000 5,000 55,000 55,000 5,000 - 125,000 Grants 250,000 - - - - - 250,000 General Fund - - - - - - - 15 Eastridge Manor Outfall Replacement Capital Costs 810,000 - - - - - 810,000 Funding Sources: Storm Fund 810,000 - - - - - 810,000 Grants - - - - - - - Bond Proceeds - - - - - - - 16 BNSF Utilities Crossing Capital Costs 10,000 - - - - - 10,000 Funding Sources: Storm Fund 10,000 - - - - - 10,000 Grants - - - - - - - Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 146 TABLE SD-2 2015 2016 2017 2018 2019 2020 Total 17 Composting Facility Capital Costs - - 750,000 - - - 750,000 Funding Sources: Storm Fund - - 750,000 - - - 750,000 Bond Proceeds - - - - - - - 18 Hillside Drainage Assessment Capital Costs 150,000 150,000 150,000 - - - 450,000 Funding Sources: Storm Fund 150,000 150,000 150,000 - - - 450,000 Bond Proceeds - - - - - - - 19 North Airport Area Improvements Capital Costs 40,000 135,000 - - - - 175,000 Funding Sources: Storm Fund 40,000 135,000 - - - - 175,000 Bond Proceeds - - - - - - - 20 D St. SE Storm Improvement Capital Costs - - 75,000 600,000 - - 675,000 Funding Sources: Storm Fund - - 75,000 600,000 - - 675,000 Bond Proceeds - - - - - - - 21 Annexation Area Small Storm Improvement Capital Costs 40,000 260,000 40,000 260,000 - - 600,000 Funding Sources: Storm Fund 40,000 260,000 40,000 260,000 - - 600,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 4,032,392 1,810,000 2,770,000 1,315,000 2,059,000 450,000 12,436,392 SUMMARY: CAPITAL COSTS Capacity Projects 1,320,050 410,000 - - 50,000 493,600 2,273,650 Non-Capacity Projects 4,032,392 1,810,000 2,770,000 1,315,000 2,059,000 450,000 12,436,392 Total Costs 5,352,442 2,220,000 2,770,000 1,315,000 2,109,000 943,600 14,710,042 FUNDING SOURCES: Storm Fund 3,085,080 2,220,000 2,770,000 1,315,000 2,109,000 943,600 12,442,680 Grants 259,887 - - - - - 259,887 Other 525,083 - - - - - 525,083 Bond Proceeds 1,482,392 - - - - - 1,482,392 Total Funding 5,352,442 2,220,000 2,770,000 1,315,000 2,109,000 943,600 14,710,042 City of Auburn Capital Facilities Plan 147 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Bypass at 2nd and G Street SE Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - 50,000 493,600 543,600 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 50,000 493,600 543,600 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - 493,600 493,600 - - 50,000 493,600 543,600 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant impact. This project will install a parallel bypass pipe to convey upstream flows around a localized low spot located at 2nd and G Street SE. The existing line will serve to drain the localized low spot. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 148 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:M Street SE Storm Improvement Project No:cpxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - 30,000 400,000 - 430,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 30,000 400,000 - 430,000 Capital Expenditures: Design - 30,000 60,000 - 90,000 Right of Way - - - - Construction - 340,000 - 340,000 - 30,000 400,000 - 430,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 400,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 400,000 Capital Expenditures: Design - - - - 60,000 Right of Way - - - - - Construction - - - - 340,000 - - - - 400,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will install a replacement pipe of greater capacity from 3rd Street SE to Main Street to alleviate periodic flooding in this area as a result of upstream flows. Progress Summary: Future Impact on Operating Budget: None, since this is a replacement pipe. City of Auburn Capital Facilities Plan 149 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:Howard Road Improvement Project No:cpxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 40,000 250,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 40,000 250,000 40,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - - - Construction - - - 250,000 - - - 40,000 250,000 40,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 290,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 290,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 250,000 - - - - 290,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Improve drainage ditch capacity along the north side of Howard Road. Improve inlet capacity and upsize existing conveying line which flows north through the Coal Creek Springs Pump Station property. Install overflow line with adjustable gate to the existing line flowing westerly in 21st St. SE. Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 150 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:37th St. NW Storm Improvement Project No:cpxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 40,000 160,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 40,000 160,000 40,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - - - Construction - - - 160,000 - - - 40,000 160,000 40,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 200,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 200,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 160,000 - - - - 200,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would increase existing pipes to provide additional capacity to alleviate current periodic flooding conditions in vicinity of I St. NW. This would also provide relief to the flooding experienced on the Interurban Bike Trail. Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 151 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:M &O Storm Drainage Improvements Project No:CP1320 Project Type:Capacity Project Manager:Seth Wickstrom Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - 164,920 305,080 - 470,000 Grants- Secured (Fed,State,Local)- 989,513 9,887 - 999,400 Bond Proceeds - - - - - Other (Water, Sewer, ERR)- 164,917 525,083 - 690,000 - 1,319,350 840,050 - 2,159,400 Capital Expenditures: Design - 485,300 - - 485,300 Right of Way - - - - - Construction - 834,050 840,050 - 1,674,100 - 1,319,350 840,050 - 2,159,400 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 305,080 Grants- Secured (Fed,State,Local)- - - - 9,887 Bond Proceeds - - - - - Other (Water, Sewer, ERR)- - - - 525,083 - - - - 840,050 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 840,050 - - - - 840,050 Grants / Other Sources: This project will construct storm drainage improvements and expand the vactor decant facility at the City's maintenance and operations facility. Progress Summary: The City received a grant from the State Department of Ecology totaling $999,400 in 2013. Preliminary design has been completed and final design is in progress. Anticipated bid award in October 2014. Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 152 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Pipeline Repair & Replacement Program Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: (Previous 2 Yrs.)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue 467,652 200,000 1,000,000 100,000 1,667,652 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 467,652 200,000 1,000,000 100,000 1,667,652 Capital Expenditures: Design 87,930 - - 100,000 87,930 Right of Way - - - - - Construction 379,722 200,000 1,000,000 - 1,579,722 467,652 200,000 1,000,000 100,000 1,667,652 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 1,000,000 100,000 1,000,000 100,000 3,300,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,000,000 100,000 1,000,000 100,000 3,300,000 Capital Expenditures: Design - 100,000 - 100,000 300,000 Right of Way - - - - - Construction 1,000,000 - 1,000,000 - 3,000,000 1,000,000 100,000 1,000,000 100,000 3,300,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Projects identified as those requiring replacement of existing infrastructure. These projects support street repairs and other utility replacement programs, requiring coordination. Progress Summary: Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 153 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Auburn Way South Flooding, Phase 2 Project No:cp1202 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds 82,068 75,000 1,482,392 - 1,639,460 Other - - - 82,068 75,000 1,482,392 - 1,639,460 Capital Expenditures: Design 82,068 75,000 - - 157,068 Right of Way - - - - - Construction - - 1,482,392 - 1,482,392 82,068 75,000 1,482,392 - 1,639,460 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - 1,482,392 Other - - - - - - - - - 1,482,392 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 1,482,392 - - - - 1,482,392 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant impact. Construct conveyance improvement to 17th Street SE as part of Metro realignment project. Replace existing conveyance line from A Street SE to K Street SE and add an additional 7 ac-ft. of storage within the existing A Street SE detention pond. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 154 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 1 Project No:cp1122 Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue 290,702 1,093,653 10,000 - 1,394,355 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - 2,406,347 - - 2,406,347 Other - - - - - 290,702 3,500,000 10,000 - 3,800,702 Capital Expenditures: Design 290,702 60,000 - - 350,702 Right of Way - - - - - Construction - 3,440,000 10,000 - 3,450,000 290,702 3,500,000 10,000 - 3,800,702 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: No significant impact. This project would install a new storm drain from the NW corner of the airport property (MH I107) to the existing Brannan Park storm pump station. This pipe would replace the existing 30-inch diameter pipe generally located along the 30th St. NE alignment and the northerly boundary of Brannan Park by improving the conveyance system’s hydraulic capacity, thereby reducing the potential for stormwater flooding into the street. • 3,820 feet of 42-in.-diameter gravity storm drain from the NW corner of airport property to the existing Brannan Park storm pump station • Removal of floatable capture baffles upstream of the Brannan Park pump station (these are not needed to protect the pumps and reduce the system’s hydraulic capacity) Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 155 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 2 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - 75,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 75,000 - Capital Expenditures: Design - - - 75,000 - Right of Way - - - - - Construction - - - - - - - 75,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 600,000 - - - 675,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 600,000 - - - 675,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction 600,000 - - - 600,000 600,000 - - - 675,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Locate a storm drain line to capture stormwater from the two residential developments at the west edge of the former CRISTA Ministries property. Currently, stormwater flows are discharged onto a depressed area on the CRISTA Ministries property where its infiltration is limited by high groundwater levels that occur during extended periods of high flows on the Green River. This phase would construct a new storm drain within I St. NE southward to connect into the upgraded 42-inch diameter (Phase 1) storm drain near the intersection at I St. NE and 30th St. NE. The 42-inch diameter line would have sufficient available capacity to convey the I St. NE flows. Key components of Phase 2 include: • 1,760 feet of 15-inch diameter gravity storm drain • Catch basin and incidental grading to collect stormwater at the upstream end of system Progress Summary: Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 156 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 3 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - 200,000 954,000 1,154,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 200,000 954,000 - 1,154,000 Capital Expenditures: Design - 200,000 - - 200,000 Right of Way - - - - - Construction - - 954,000 - 954,000 - 200,000 954,000 - 1,154,000 Grants / Other Sources: This project would reduce flooding in C St. NE by redirecting wet weather high flows southward to the 42-inch diameter (Phase 1) storm drain in 30th St. NE. By redirecting the C St. NE drainage into the Brannan Park system, these flows would no longer be affected by high water levels in Mill Creek. To avoid deepening the Phase 1 gravity line (and extensive retrofits to the Brannan Park pump station), this project would include a wet weather pump station and force main connection to 30th St. NE. The upgraded 42-inch diameter pipe in 30th St. NE would have sufficient capacity for these additional flows. Key components of Phase 3 include: • Wet weather pump station (estimated capacity of 4.5 to 7 cfs). • 1,730 feet of 15-inch diameter force main • Diversion structure in C St. NE for pump station Progress Summary: Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 157 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: West Main Street Pump Station Upgrade Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 125,000 985,000 125,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 125,000 985,000 125,000 Capital Expenditures: Design - - 125,000 125,000 Right of Way - - - - - Construction - - - 985,000 - - - 125,000 985,000 125,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 1,110,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,110,000 Capital Expenditures: Design - - - 125,000 Right of Way - - - - Construction - - - - 985,000 - - - - 1,110,000 Grants / Other Sources: No significant impact. This project will update the existing pump station by providing a redundant pump and telemetry system meeting level of service goals. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 158 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Street Utility Improvements Project No:cpxxxx Project Type:Non Capacity Project Manager:TBD Description: Activity: Previous 2 years 2014 YE 2014 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue 233,367 - 100,000 100,000 333,367 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 233,367 - 100,000 100,000 333,367 Capital Expenditures: Design 15,296 - - - 15,296 Right of Way - - - - - Construction 218,071 - 100,000 100,000 318,071 233,367 - 100,000 100,000 333,367 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 100,000 100,000 100,000 100,000 600,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 100,000 100,000 100,000 600,000 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Storm drainage conveyance improvements in coordination with Arterial and SOS improvements. Progress Summary: Future Impact on Operating Budget: No significant Impact. City of Auburn Capital Facilities Plan 159 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Comprehensive Storm Drainage Plan Update Project No:cp1405 Project Type:Non-Capacity Project Manager:Carlaw Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - 340,000 10,000 - 350,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 340,000 10,000 - 350,000 Capital Expenditures: Design - 340,000 10,000 - 350,000 Right of Way - - - Construction - - - - - - 340,000 10,000 - 350,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - 250,000 260,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 250,000 260,000 Capital Expenditures: Design - - - 250,000 260,000 Right of Way - - - - - Construction - - - - - - - - 250,000 260,000 Grants / Other Sources: None Update the Comprehensive Storm Drainage Plan to be consistent with the City's overall Comprehensive Plan update as required by the State of Washington. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 160 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Mill Creek Wetland 5K Reach Restoration Project No:CP0746 Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total General Fund 29,198 - - - 29,198 Unrestricted Storm Revenue 23,590 1,101,410 5,000 5,000 1,130,000 Grants- Secured (Fed,State,Local)269,693 282,000 250,000 - 801,693 City (Real Estate Owned)- - - - - 322,481 1,383,410 255,000 5,000 1,960,891 Capital Expenditures: Design 321,521 48,410 - - 369,931 Right of Way 960 350,000 250,000 - 600,960 LERRD Credit - (900,000) - - (900,000) Construction - 1,885,000 5,000 5,000 1,890,000 322,481 1,383,410 255,000 5,000 1,960,891 Total 2017 2018 2019 2020 2015-2020 Funding Sources: General Fund - - - - - Unrestricted Storm Revenue 55,000 55,000 5,000 - 125,000 Grants- Secured (Fed,State,Local)- - - - 250,000 City (Real Estate Owned)- - - - - 55,000 55,000 5,000 - 375,000 Capital Expenditures: Design - - - - - Right of Way - - - - 250,000 Construction 55,000 55,000 5,000 - 125,000 55,000 55,000 5,000 - 375,000 Mill Creek Wetland 5K reach (W5K) is a stream restoration project to provide improved conveyance and habitat along an approximate one mile reach of Mill Creek between West Main Street and SR 167. The project includes construction of a new larger stream culvert at 15th Street NW for improved hydraulic conveyance and fish passage, removal of invasive vegetation, native tree and shrub plantings. The project is being conducted in partnership with the Army Corps of Engineers under the Corps' Ecosystem Restoration Program. The City's cost share for construction is 35%, and the federal cost share is 65%. The value of City-owned lands used for the project are credited toward the City's cost share. Total federal funding for the project (not shown below) is approximately $3.9 million based on the most recent Corps estimates of $6 million for total project costs. Progress Summary: The City has executed a design agreement with the Army Corps of Engineers, and 35 percent of design was completed in 2012; final design is scheduled to complete in early 2014. Next steps include real estate and right of way acquisition/certification, with construction scheduled for 2014-2015. A Project Partnership (construction) agreement will need to be executed between the City and the Corps prior to real estate acquisition and construction. Future Impact on Operating Budget: Monitoring and maintenance during the required 5 year monitoring period is part of the overall project costs. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 161 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Eastridge Manor Outfall Replacement Project No:cp1316 Project Type:Non-Capacity Project Manager:Matt Larson Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue 7,100 350,000 810,000 - 1,167,100 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 7,100 350,000 810,000 - 1,167,100 Capital Expenditures: Design 7,100 165,000 - - 172,100 Right of Way - 185,000 - - 185,000 Construction - - 810,000 - 810,000 7,100 350,000 810,000 - 1,167,100 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 810,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 810,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 810,000 - - - - 810,000 Grants / Other Sources: Replace the existing deteriorated outfall with new High Density Polyethylene (HDPE). Two existing outfalls may be combined into a single outfall. Improvements to the Golf Course conveyance system may be needed. Progress Summary: None Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 162 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: BNSF Utilities Crossing Project No:cp1308 Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - 41,356 10,000 - 51,356 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds 97,583 402,417 - - 500,000 Other - - - - - 97,583 443,773 10,000 - 551,356 Capital Expenditures: Design 97,583 40,131 - - 137,714 Right of Way - - - - - Construction - 403,642 10,000 - 413,642 97,583 443,773 10,000 - 551,356 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 10,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 10,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 10,000 - - - - 10,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Replace or extend as needed the existing crossing casings to accommodate the 3rd rail improvement. Progress Summary: Project design will be complete in 2014 and construction is anticipated to start in early October. Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 163 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:Composting Facility Project No:CPxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 750,000 - - - 750,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 750,000 - - - 750,000 Capital Expenditures: Design - - - - Right of Way 750,000 - - - 750,000 Construction - - - - 750,000 - - - 750,000 Grants / Other Sources: Property acquisition and site improvements to construct a composting facility. Progress Summary: Future Impact on Operating Budget: Impacts to the operating budget will be analyzed and calculated once the timing of expenses is determined. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 164 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:Hillside Drainage Assessment Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 150,000 150,000 150,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 150,000 150,000 150,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - - - 50,000 - Construction - - - 100,000 - - - 150,000 150,000 150,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 150,000 - - - 450,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 150,000 - - - 450,000 Capital Expenditures: Design - - - - 150,000 Right of Way - - - - 50,000 Construction 150,000 - - - 250,000 150,000 - - - 450,000 Grants / Other Sources: The existing drainage system includes pipes that discharge over hillsides. While a preliminary inventory and mapping of locations has been completed, field-locating and detailed inspection is warranted to define deficiencies. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 165 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:North Airport Area Improvements Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 40,000 135,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 40,000 135,000 40,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - - - Construction - - - 135,000 - - - 40,000 135,000 40,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue - - - - 175,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 175,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 135,000 - - - - 175,000 Grants / Other Sources: This project would provide additional storage depth in Pond I and replace the existing inlet pipe at a lower invert to the pond, and install a backflow preventer at the outlet. The project also includes the installation of a second backflow preventer at the overflow to 30th St. NE to protect the hangar area. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 166 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:D St. SE Storm Improvement Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 75,000 600,000 - - 675,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 75,000 600,000 - - 675,000 Capital Expenditures: Design 75,000 - - - 75,000 Right of Way - - - - - Construction - 600,000 - - 600,000 75,000 600,000 - - 675,000 Grants / Other Sources: This project would replace the existing line from 21st St. SE to 23rd St. SE and install a new extension to 25th St. SE.The project will eliminate an existing drywell near 25th & D St. SE Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 167 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title:Annexation Area Small Storm Improvement Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Storm Revenue - - 40,000 260,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 40,000 260,000 40,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - 50,000 - Construction - - - 210,000 - - - 40,000 260,000 40,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Storm Revenue 40,000 260,000 - - 600,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 40,000 260,000 - - 600,000 Capital Expenditures: Design 40,000 - - - 80,000 Right of Way - 50,000 - - 100,000 Construction - 210,000 - - 420,000 40,000 260,000 - - 600,000 Grants / Other Sources: Improve existing drainage conditions for the annexation areas. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 168 City of Auburn Capital Facilities Plan 169 SOLID WASTE Current Facilities The City of Auburn no longer has recycle drop station facilities. The City now provides curbside service through a vendor who handles the disposal. City of Auburn Capital Facilities Plan 170 City of Auburn Capital Facilities Plan 171 PARKS, ARTS AND RECREATION Current Facilities The City of Auburn’s park system consists of a total of 735.53 acres of neighborhood and community parks, special use areas, open space, and linear parks (trails). The 150-acre Auburn Municipal Golf Course is identified as a separate public facility in this report, and is not included in the Parks and Recreation inventory. Table PR – 1 “Facilities Inventory” lists all park and recreation land in the City’s park system along with their current capacity and location. Level of Service (LOS) The current LOS provided by the City’s park system represents the existing inventory of City- owned park acres divided by the 2014 City population of 74,630. This equates to 0.86 acres per 1,000 population for neighborhood parks, 3.16 acres per 1,000 population for community parks, 0.44 acres for linear parks, 4.66 acres for open space, and 0.73 acres for special use areas. The proposed LOS provided by the City’s park system represents the planned 2020 inventory of City-owned park acres divided by the 2020 projected City population of 85,288. This equates to 0.86 acres per 1,000 population for neighborhood parks, 3.46 acres per 1,000 population for community parks, 0.38 acres per 1,000 population for linear parks, 4.08 acres per 1,000 population for open space, and 0.64 acres per 1,000 population for special use areas. Capital Facilities Projects and Financing Parks and Recreation facilities include seventeen capital projects at a cost of $24,205.000. Table PR – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table PR – 3 shows, operating budget impacts of $891,000 are forecasted for parks and recreation facilities during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 172 TABLE PR-1 Facilities Inventory Parks, Arts and Recreation, Land CAPACITY FACILITY (Acres)LOCATION Neighborhood Parks: Existing Inventory: 21st Street Playground 0.20 21st Street SE & D Street SE Auburndale Park 10.00 31700 108th NE Ballard Park 0.70 37th & R Street SE Cameron Park 3.90 Lemon Tree Lane & Academy Drive Cedar Lane Park 8.30 25th & K Street SE Dorthy Bothell Park 4.00 5701 Lakeland Hills Way SE Dykstra Park 1.70 1533 22nd Avenue NE Forest Villa mini-park 0.20 17th & Fir Street SE Gaines Park 1.40 11th NW & W Valley Highway Green River Property 10.00 104th Street SE Indian Tom Park 0.40 6th & Henry Road NE Jornada Park 1.90 1440 U Court NW Kersey 3 Park #1 1.80 Charlotte Ave SE & Evergreen Way SE Kersey 3 Park #2 2.10 56th Street SE & Udall Avenue SE Lakeland Hills Park 5.00 5401 Olive Avenue SE Rotary Park 4.00 27th & Alpine Street SE Scootie Brown Park 1.70 8th & Henry Road NE Shaughnessy Park 3.50 21st & Hemlock SE Terminal Park 1.20 12th & C Street SE Trail Run Park 1.21 Village Square 1.07 310th St SE @ 120th Ave Total Neighborhood Parks 64.28 Proposed Capacity Projects: Auburndale II Park 9.34 29700 118th Street SE Total Proposed Capacity Projects 9.34 2020 Projected Inventory Total - Neighborhood Parks -73.62 Community Parks: Existing Inventory: Brannan Park 21.70 26th & M Street NE Fenster/Green River Access 13.40 10520 Auburn/Black Diamond Road Fulmer Field 5.00 5th & K Street NE Game Farm Park 63.00 3226 V Street SE Game Farm Wilderness Park 20.00 2401 SE Stuck River Road GSA Park 6.60 C Street SW & 15th SW Isaac Evans Park 14.90 29627 Green River Road NE Lea Hill Park 7.00 SE 316th & 124th Street SE Les Gove Park 20.50 11th & Auburn Way S Mill Pond 4.00 600 Oravetz Road Olson Canyon Farmstead 15.00 28728 Green River Road Roegner Park 21.60 601 Oravetz Road Sunset Park 15.00 1306 69th Street SE Veteran's Memorial Park 8.50 Park Avenue & Auburn Way N Total Community Parks 236.20 City of Auburn Capital Facilities Plan 173 TABLE PR-1 (continued) Proposed Capacity Projects: Jacobson Tree Farm 29.04 13009 SE 294th Street Lakeland Hills 30.00 Kersey Way Total Proposed Capacity Projects 59.04 2020 Projected Inventory Total - Community Parks -295.24 Linear Parks: Existing Inventory: Interurban Trail 25.40 Lakeland Hills Trail 2.30 5401 Olive Avenue SE White River Trail 4.90 Total Linear Parks 32.60 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2020Projected Inventory Total - Linear Parks -32.60 Special Use Areas: Existing Inventory: Bicentennial Park 1.40 SR-18 & Auburn Way S Centennial Viewpoint Park 0.70 600 Mountain View Drive City Hall Plaza 0.90 25 W Main Clark Plaza 0.20 15th & Auburn Way N B Street Plaza 0.10 E. Main & B Street SE Plaza Park 0.15 25 W Main Mountain View Cemetery 50.00 2020 Mountain View Drive Pioneer Cemetery 0.80 8th & Auburn Way N Slaughter Memorial 0.20 3100 Auburn Way N Total Special Use Areas 54.45 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2020 Projected Inventory Total - Special Use Areas -54.45 Open Space Areas: Existing Inventory: Auburn Environmental Park Open Space 120.00 Western Ave NW and Maint Street Clark Property 25.00 1600 Oravetz Road Game Farm Open Space 87.00 2400 SE Stuck River Road Golf Course Open Space 42.00 29639 Green River Road Green River Property 10.00 315th Street Se & 104th Way SE Lakeland Native Area 10.00 Oravetz Road Olson Canyon Open Space 45.00 28728 Green River Road West Auburn Lake Property Open Space 9.00 N of S 321st and west of W St.NW Total Open Space Areas 348.00 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2020 Projected Inventory Total - Open Space Areas -348.00 City of Auburn Capital Facilities Plan 174 TABLE PR-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING PARKS, ARTS and RECREATION (Municipal Parks Construction Fund) 2015 2016 2017 2018 2019 2020 Total Capacity Projects: 1 Park Acquisitions/Development Capital Costs - - 125,000 125,000 125,000 - 375,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - Bond Proceeds - - - - - - - KC Prop 2 - - 125,000 125,000 125,000 - 375,000 Subtotal, Capacity Projects: Capital Costs - - 125,000 125,000 125,000 - 375,000 Non-Capacity Projects: 2 Isaac Evans Park Capital Costs - 100,000 - - - - 100,000 Funding Sources: Fund Balance - 50,000 - - - - 50,000 Grants (Fed,State,Local)- - - - - - - Other (Park Impact Fee)- 50,000 - - - - 50,000 3 Jacobsen Tree Farm Site Plan Capital Costs - - 12,000,000 - - - 12,000,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - 2,000,000 - - - 2,000,000 Other (Developer)- - 4,000,000 - - - 4,000,000 Bond Proceeds - - 6,000,000 - - - 6,000,000 4 Auburn Community and Youth/Teen Center Capital Costs 3,500,000 5,100,000 - - - - 8,600,000 Funding Sources: REET 1 300,000 759,219 - - - - 1,059,219 Other 2,200,000 2,340,781 4,540,781 Grants (Fed,State,Local)1,000,000 2,000,000 - - - - 3,000,000 5 Les Gove Park Improvements Capital Costs 40,000 260,000 - - - - 300,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - KC Prop 2 40,000 260,000 - - - - 300,000 6 Rotary Park Improvements Capital Costs - - 30,000 - - - 30,000 Funding Sources: Fund Balance - - 30,000 - - - 30,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - City of Auburn Capital Facilities Plan 175 TABLE PR-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 7 Misc. Parks Improvements Capital Costs 100,000 100,000 175,000 175,000 175,000 175,000 900,000 Funding Sources: Fund Balance - - 25,000 25,000 25,000 25,000 100,000 Grants (Fed,State,Local)50,000 50,000 75,000 75,000 75,000 75,000 400,000 Other (Park Impact Fee)50,000 50,000 75,000 75,000 75,000 75,000 400,000 8 Cameron Park Capital Costs - - - - 55,000 - 55,000 Funding Sources: Fund Balance - - - - 25,000 - 25,000 Grants (Fed,State,Local)- - - - 30,000 - 30,000 Other - - - - - - - 9 Game Farm Park Improvements Capital Costs - - 40,000 - - - 40,000 Funding Sources: Fund Balance - - 40,000 - - - 40,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - 10 Gaines Park Capital Costs - - 30,000 - - - 30,000 Funding Sources: Fund Balance - - 30,000 - - - 30,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - 11 Roegner Park Capital Costs - - 50,000 - - - 50,000 Funding Sources: Fund Balance - - 50,000 - - - 50,000 Grants (Fed,State,Local)- - - - - - - KC Prop 2 - - - - - - - 12 Auburndale Park Capital Costs 25,000 - - 350,000 - - 375,000 Funding Sources: Fund Balance 25,000 - - - - - 25,000 KC Prop 2 - - - 100,000 - - 100,000 Other (Park Impact Fee)- - - 250,000 - - 250,000 13 Auburndale Park II Capital Costs 25,000 - - 575,000 - - 600,000 Funding Sources: Fund Balance 25,000 - - - - - 25,000 Grants (Fed,State,Local)- - - - - - - Other - - - 575,000 - - 575,000 14 Sunset Park Capital Costs 15,000 385,000 - - - - 400,000 Funding Sources: Fund Balance - - - - - - - Other (Park Impact Fee)15,000 185,000 - - - - 200,000 Other (Contributions)- 200,000 - - - - 200,000 City of Auburn Capital Facilities Plan 176 TABLE PR-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 15 BPA Trail on Lea Hill Capital Costs - - - - - 150,000 150,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - 150,000 150,000 KC Prop 2 - - - - - - - 16 Lakeland Park #4 Capital Costs - - 25,000 150,000 - - 175,000 Funding Sources: Fund Balance - - 25,000 - - - 25,000 Other - - - 150,000 - - 150,000 17 Fenster Levee Setback, Phase 2B Capital Costs 25,000 - - - - - 25,000 Funding Sources: Grants (Fed,State,Local)- - - - - - - Other (Storm)25,000 - - - - - 25,000 Subtotal, Non-Capacity Projects: Capital Costs 3,730,000 5,945,000 12,350,000 1,250,000 230,000 325,000 23,830,000 SUMMARY: CAPITAL COSTS Capacity Projects - - 125,000 125,000 125,000 - 375,000 Non-Capacity Projects 3,730,000 5,945,000 12,350,000 1,250,000 230,000 325,000 23,830,000 Total Costs 3,730,000 5,945,000 12,475,000 1,375,000 355,000 325,000 24,205,000 FUNDING SOURCES: Fund Balance 50,000 50,000 200,000 25,000 50,000 25,000 400,000 Grants (Fed,State,Local)1,050,000 2,050,000 2,075,000 75,000 105,000 225,000 5,580,000 REET 1 300,000 759,219 - - - - 1,059,219 Bond Proceeds - - 6,000,000 - - - 6,000,000 KC Prop 2 40,000 260,000 125,000 225,000 125,000 - 775,000 Other -Parks Impact 65,000 285,000 75,000 325,000 75,000 75,000 900,000 Other 2,225,000 2,540,781 4,000,000 725,000 - - 9,490,781 Total Funding 3,730,000 5,945,000 12,475,000 1,375,000 355,000 325,000 24,205,000 City of Auburn Capital Facilities Plan 177 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Park Acquisitions/Development Project No:cpxxxx Project Type:Capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs.)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - General Fund Transfer In - 22,500 - - 22,500 KC Prop 2*227,458 23,914 - - 251,372 227,458 46,414 - - 273,872 Capital Expenditures: Design - - - - - Acquisition 227,458 46,414 - - 273,872 Construction - - 227,458 46,414 - - 273,872 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - General Fund Transfer In - - - - - KC Prop 2*125,000 125,000 125,000 - 375,000 125,000 125,000 125,000 - 375,000 Capital Expenditures: Design - - - - - Acquisition 125,000 125,000 125,000 - 375,000 Construction - - - - - 125,000 125,000 125,000 - 375,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Land acquisitions to occur based on demand and deficiencies including parks, open space, trails and corridors. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 178 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Isaac Evans Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 50,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*- - - 50,000 - - - - 100,000 - Capital Expenditures: Design - - - 10,000 - Right of Way - - - - - Construction - - - 90,000 - - - - 100,000 - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*- - - - 50,000 - - - - 100,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 90,000 - - - - 100,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Increased mowing and utilities- $6,000 Repair trail throughout park, improve playground and develop reforestation plan. Progress Summary: None Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 179 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Jacobsen Tree Farm Site Plan Project No:cp0609 Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance 25,321 - - - 25,321 Grants- Unsecured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Development)- - - - - 25,321 - - - 25,321 Capital Expenditures: Design 25,321 - - - 25,321 Right of Way - - - - - Construction - - - - - 25,321 - - - 25,321 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)2,000,000 - - - 2,000,000 Bond Proceeds 6,000,000 - - - 6,000,000 REET - - - - - Other (Development)4,000,000 - - - 4,000,000 12,000,000 - - - 12,000,000 Capital Expenditures: Design 1,000,000 - - - 1,000,000 Right of Way - - - - - Construction 11,000,000 - - - 11,000,000 12,000,000 - - - 12,000,000 Grants / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Implement Master Plan for the development of this 31 acre site. Lea Hill area is deficient in park acreage. Progress Summary: Future Impact on Operating Budget: No significant impact due to master plan. Future park development will result in maintenance and utility expenses undeterminable at this time. City of Auburn Capital Facilities Plan 180 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Auburn Community and Youth/Teen Center Project No:cp1412 Project Type:Non-Capacity Project Manager:Jacob Sweeting Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured -State - - 1,000,000 2,000,000 1,000,000 REET 1 - 400,000 300,000 759,219 700,000 Other (Solid Waste Fees)- - - - - Other - - 2,200,000 2,340,781 2,200,000 - 400,000 3,500,000 5,100,000 3,900,000 Capital Expenditures: Property Acquisition - - - - Design - 400,000 1,528,400 - 1,928,400 Demolition - - - - - Construction - - 1,971,600 5,100,000 1,971,600 - 400,000 3,500,000 5,100,000 3,900,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured -State - - - - 3,000,000 REET 1 - - - - 1,059,219 Other (Solid Waste Fees)- - - - - Other - - - - 4,540,781 - - - - 8,600,000 Capital Expenditures: Property Acquisition - - - - - Design - - - - 1,528,400 Professional Services - - - - - Construction - - - - 7,071,600 - - - - 8,600,000 Construct a new approximately 13,000 sq. ft. Community Center facility as well as repurpose the existing Parks, Recreation and Arts Administration building into a Youth/Teen Center. The project includes site improvements associated with the construction at Les Gove Campus and administrative space for the Parks Department, meeting, activity and fitness space as well as a dedicated youth/teen center. The State has allocated $3 million of the capital budget to the City to fund the project. Progress Summary: Design in 2014 & 2015, bid and begin construction in 2015 with construction completed in 2016. Future Impact on Operating Budget: The annual operating budget fiscal impact is estimated to be $150,000 Grants / Other Sources: Washington State capital budget appropriation through the Department of Commerce Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 181 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Les Gove Park Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - KC Prop 2 - - 40,000 260,000 40,000 - - 40,000 260,000 40,000 Capital Expenditures: Design - - 40,000 10,000 40,000 Right of Way - - - - Construction - - 250,000 - - - 40,000 260,000 40,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - KC Prop 2 - - - - 300,000 - - - - 300,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - 250,000 - - - - 300,000 Grants / Other Sources: $5,000 Utilities Based on "to be completed" Les Gove Master Plan, design and implement recommendations that will increase user safety, encourage public use and community connectivity. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 182 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Rotary Park Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 30,000 - - - 30,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - 30,000 - - - 30,000 Capital Expenditures: Design 5,000 - - - 5,000 Right of Way - - - - - Construction 25,000 - - - 25,000 30,000 - - - 30,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Coordinate improvements with neighborhood and Rotary Club of Auburn to add walking path. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 183 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Miscellaneous Parks Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured State - - 50,000 50,000 50,000 Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*10,922 50,000 50,000 60,922 10,922 - 100,000 100,000 110,922 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 10,922 100,000 100,000 110,922 10,922 - 100,000 100,000 110,922 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 25,000 25,000 25,000 25,000 100,000 Grants- Unsecured State 75,000 75,000 75,000 75,000 400,000 Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*75,000 75,000 75,000 75,000 400,000 175,000 175,000 175,000 175,000 900,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 175,000 175,000 175,000 175,000 900,000 175,000 175,000 175,000 175,000 900,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Minor park improvements including shelters, roofs, playgrounds, irrigation and restrooms. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 184 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Cameron Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - 25,000 - 25,000 Grants- Unsecured (Fed,State,Local)- - 30,000 - 30,000 Bond Proceeds - - - - - REET - - - - - Other - - - - - - - 55,000 - 55,000 Capital Expenditures: Design - - 5,000 - 5,000 Right of Way - - - - - Construction - - 50,000 - 50,000 - - 55,000 - 55,000 Grants / Other Sources: None This project will improve the pedestrian trail and add landscape and fencing to serve as buffer to the neighborhood and play structure. This project is identified in the Parks Improvement Plan. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 185 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Game Farm Park Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 40,000 - - - 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - 40,000 - - - 40,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 40,000 - - - 40,000 40,000 - - - 40,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Improve interior lighting and pathways and provide access from the newly acquired property on southwest corner of the park. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 186 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Gaines Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 30,000 - - - 30,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - 30,000 - - - 30,000 Capital Expenditures: Design 10,000 - - - 10,000 Right of Way - - - - - Construction 20,000 - - - 20,000 30,000 - - - 30,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Develop Horticulture Plan for the Park as indicated in the Parks Improvement Plan and repair boardwalk. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 187 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Roegner Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Prop Levy 2)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Forecasted Project Cost: Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 50,000 - - - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Prop Levy 2)- - - - - 50,000 - - - 50,000 Capital Expenditures: Design 5,000 - - - 5,000 Right of Way - - - - - Construction 45,000 - - - 45,000 50,000 - - - 50,000 Grants / Other Sources: This project will provide for trail system maintenance, play structure replacement and riverbank stabilization. Progress Summary: Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: City of Auburn Capital Facilities Plan 188 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Auburndale Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - 25,000 - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)- - - - - Other (KC Prop 2)- - - - - - - 25,000 - 25,000 Capital Expenditures: Design - - 25,000 - 25,000 Right of Way - - - - - Construction - - - - - - - 25,000 - 25,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)- 250,000 - - 250,000 Other (KC Prop 2)- 100,000 - - 100,000 - 350,000 - - 375,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - 350,000 - - 350,000 - 350,000 - - 375,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Utilities would increase by $5,000 Develop a Master Plan for the Park, install an irrigation system, new play structure and improve signage. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 189 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Auburndale Park II Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - 25,000 - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD - - - - - - - 25,000 - Capital Expenditures: Design - - 25,000 - 25,000 Right of Way - - - - - Construction - - - - - - - 25,000 - 25,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD - 575,000 - - 575,000 - 575,000 - - 600,000 Capital Expenditures: Design - 75,000 - - 100,000 Right of Way - - - - - Construction - 500,000 - - 500,000 - 575,000 - - 600,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Develop a Master Plan in 2015; improve the existing trail system and install signage and play structure. Progress Summary: Future Impact on Operating Budget: Increased utility costs of $2,000 City of Auburn Capital Facilities Plan 190 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Sunset Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - - 15,000 185,000 15,000 Other -Contributions & Donations - - - 200,000 - - - 15,000 385,000 Capital Expenditures: Design - - 15,000 - 15,000 Right of Way - - - - - Construction - - - 385,000 - - - 15,000 385,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - - - - 200,000 Other -Contributions & Donations - - - - 200,000 - - - - 400,000 Capital Expenditures: Design - - - - 15,000 Right of Way - - - - - Construction - - - - 385,000 - - - - 400,000 Grants / Other Sources: Description: Expand playground area to include spray park and additional play activities. Coordinate improvements with service club and Lakeland Hills Homeowners Association. Progress Summary: Future Impact on Operating Budget: Increase in Utilities of $10,000 per year Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 191 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: BPA Trail on Lea Hill Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (State RCO)- - - - - Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - - - - - - Capital Expenditures: Predesign - - - - - Design - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (State RCO)- - - 150,000 150,000 Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - - - - 150,000 150,000 Capital Expenditures: Predesign - - - 25,000 25,000 Design - - - 125,000 125,000 Construction - - - - - - - - 150,000 150,000 Grants / Other Sources: None Develop a feasibility study related to constructability of a pedestrian trail linking the Jacobsen Tree Farm site to the west end of Lea Hill. This trail would follow the alignment of the Bonneville Power Administration (BPA) transmission lines from 132nd to 108th Avenue SE. Construction would be in phases based on constructability. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 192 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Lakeland Park #4 Project No:cpXXXX Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund 321 -Unrestricted Fund Balance 25,000 - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - 150,000 - - 150,000 25,000 150,000 - - 175,000 Capital Expenditures: Design 25,000 - - - 25,000 Right of Way - - - - - Construction - 150,000 - - 150,000 25,000 150,000 - - 175,000 Grants / Other Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Increased maintenance costs of $5,000 Complete Master Plan to include the development and construction of an environmental community park. Trails, fencing, parking and visitor amenities are included in the project. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 193 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Project Title: Fenster Levee Setback, Phase 2B Project No:CP1016 Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Other (Storm)800 9,200 25,000 - 35,000 Other (Parks Capital)- 160,269 - - 160,269 Grants- Secured (Fed,State,Local)143,941 826,914 - - 970,855 Bond Proceeds - - - - - General Fund - - - - - 144,741 996,383 25,000 - 1,166,124 Capital Expenditures: Design 144,741 638 - - 145,379 Right of Way - - - - - Construction - 995,745 25,000 - 1,020,745 144,741 996,383 25,000 - 1,166,124 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Other (Storm)- - - - 25,000 Other (Parks Capital)- - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - General Fund - - - - - - - - - 25,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 25,000 - - - - 25,000 Grants / Other Sources: SRFB $304,103; PSAR $100,000; KCD $200,000; WRIA 9/KCFD $300,000; SRFB $327,000 Total Expenditures: The project will design and construct approximately 800 feet of levee setback along the left bank of the Green River at the City's Fenster Nature Park property. The project is intended to improve fish habitat and provide refuge for salmonids as well as create additional flood storage capacity during periods of higher river flow during/after storm events and/or when additional volumes of water are released from Howard Hanson Dam. This project will complete floodplain restoration and habitat improvements along an approximately two mile reach of the Green River that begins at Auburn Narrows in unincorporated King County and ends at Fenster Nature Park in Auburn. The City is partnering with King County and the Veteran's Conservation Corp to construct the project, which is scheduled to be completed in 2015. Progress Summary: Project design has been completed and construction of the project is in progress. Future Impact on Operating Budget: After construction, the project will need to be monitored and maintained for a minimum of five years to ensure that the setback levee is operating properly and the restoration plantings become successfully established. Post construction monitoring and maintenance of the site is accomplished under a separate existing program for restoration site monitoring that is funded in the Planning and Development Department operations budget. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 194 TABLE PR-3 Impact on Future Operating Budgets PARKS, ARTS & RECREATION - MUNICIPAL PARKS CONSTRUCTION Project:2016 2017 2018 2019 2020 2021 Total 1 Park Acquisitions -$ -$ -$ -$ -$ -$ -$ - 2 Issac Evans Park - 6,000 6,000 6,000 6,000 6,000 30,000 3 Jacobsen Tree Farm - - - - - - - - - 4 Auburn Community and Youth/Teen Center - 150,000 150,000 150,000 150,000 150,000 750,000 5 Les Gove Park Imp.- 5,000 5,000 5,000 5,000 5,000 25,000 6 Rotary Park Improv.- - - - - - - 7 Misc Park Improvements - - - - - - - 8 Cameron Park - - - - - - - 9 Game Farm Park - - - - - - - 10 Gaines Park - - - - - - - 11 Roegner Park - - - - - - - 12 Auburndale Park - - - 5,000 5,000 5,000 15,000 13 Auburndale Park II - - - 2,000 2,000 2,000 6,000 14 Sunset Park - 10,000 10,000 10,000 10,000 10,000 50,000 15 BPA Trail Lea Hill - - - - - - - 16 Lakeland Park #4 - - - 5,000 5,000 5,000 15,000 17 Fenster Levee Setback - - - - - - - Total -$ 171,000$ 171,000$ 183,000$ 183,000$ 183,000$ 891,000$ City of Auburn Capital Facilities Plan 195 COMMUNITY AND YOUTH/TEEN CENTER Current Facilities The City of Auburn currently does not have a Community and Youth/Teen Center. Level of Service (LOS) The City does not have a current LOS for a Community Center. The proposed LOS of 234.50 square feet per 1,000 population is based on the projected inventory divided by the 2020 projected citywide population of 85,288. Capital Facilities Projects and Financing The proposed Community and Youth/Teen Center facility construction project will cost approximately $9,000,000 and the project detail worksheet is presented on page 180. Impact on Future Operating Budgets As Table PR – 3 shows, estimated operating budget impact of $750,000 is forecasted for the Community and Youth/Teen Center Facility during the six years 2016-2021. TABLE PR-4 Facilities Inventory Community and Youth/Teen Center CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: None - Total Existing Inventory - Proposed Capacity Projects: New Youth/Teen Center (Remodel)7,000 New Community Center 13,000 Total Proposed Capacity Projects 20,000 2020 Projected Inventory Total 20,000 City of Auburn Capital Facilities Plan 196 SENIOR CENTER Current Facilities The City of Auburn currently has one Senior Center. Table PR-5 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 168.83 square feet per 1,000 population is based on the existing inventory divided by the 2014 citywide population of 74,630. The proposed LOS of 147.73 square feet per 1,000 population is based on the projected inventory divided by the 2020 projected citywide population of 85,288. Capital Facilities Projects and Financing The CFP does not include any senior center capital facilities projects during 2015-2020. Impact on Future Operating Budgets There are no operating budget impacts forecasted for the senior center facility during the six years 2016 – 2021. TABLE PR-5 Facilities Inventory Senior Center CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: Senior Center 12,600 808 9th Street SE Total Existing Inventory 12,600 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2020 Projected Inventory Total 12,600 City of Auburn Capital Facilities Plan 197 GENERAL MUNICIPAL BUILDINGS Current Facilities The current inventory of City government administration and operations facilities include 167,896 square feet for general government operations, 61,888 square feet for police services, and 31,653 square feet for fire protection, for a total of 261,434 square feet. Table GM – 1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 3,503.07 square feet per 1,000 population is based on the existing inventory divided by the 2014 citywide population of 74,630. The proposed LOS of 3,130.98 square feet per 1,000 population is based on the projected inventory divided by the 2020 projected citywide population of 85,288. Capital Facilities Projects and Financing The City’s General Municipal Building facilities include five capital projects at a cost of $1,570,000 and debt service at a cost of $3,967,223 for a total of $5,537,223. The projects include (1) $200,000 for M&O Vehicle Storage Bay Improvements, (2) $500,000 for Equipment Rental Vehicle Maintenance Bay (3) $320,000 for M&O Fuel Tank Replacement (4) $400,000 for M&O Small Equipment and Tool Storage Building, (5) $150,000 for M&O Lunchroom expansion and $3,967,223 for City Hall Annex debt service costs. Table GM – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets Operating budget impacts annually are not yet forecast for general municipal buildings during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 198 TABLE GM-1 Facilities Inventory General Municipal Buildings CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: General Government: City Hall 61,721 25 W Main Street City Hall Annex 45,034 1 W Main Street City Maintenance & Operations Facility 17,940 1305 C Street SW Municipal Court (Justice Center-Leased to King County)12,200 340 E Main Street Activity Center 10,074 910 9th Street SE Parks & Recreation Admin. Facility 7,804 910 9th Street SE Auburn Valley Humane Society -(Leased to AVHS)5,900 4910 A Street GSA Building 4,470 2905 C Street #815 Street Waste Handling Facility 2,750 1305 C Street SW Total 167,893 Police: Gun range 32,880 1600 Block 15th St NW Headquarters (Justice Center)24,800 340 E Main Street Seized vehicle parking stalls 3,000 1101 Supermall Way Supermall Substation 1,208 C Street SW (GSA) Total 61,888 Fire: Stations: North Station #31 12,220 1101 D Street NE GSA Station #35 9,533 2815 C Street SW South Station #32 5,200 1951 R Street SE Other Facilities: North Station Maint. Facility 4,700 1101 D Street NE Total 31,653 Total Existing Inventory 261,434 Proposed Capacity Projects: Community 15,000 Total Proposed Capacity Projects 15,000 2020 Projected Inventory Total 276,434 City of Auburn Capital Facilities Plan 199 TABLE GM-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING GENERAL MUNICIPAL BUILDINGS 2015 2016 2017 2018 2019 2020 Total Capacity Projects: None Non-Capacity Projects: 1 M & O Vehicle Storage Bay Improvements Capital Costs 100,000 100,000 - - - - 200,000 Funding Sources: Equip. Rental Fund 100,000 100,000 - - - - 200,000 2 Equipment Rental Vehicle Maintenance Bay Capital Costs 250,000 250,000 - - - - 500,000 Funding Sources: Equip. Rental Fund 250,000 250,000 - - - - 500,000 3 M&O Fuel Tank Replacement Capital Costs 70,000 250,000 - - - - 320,000 Funding Sources: Equip. Rental Fund 70,000 250,000 - - - - 320,000 4 M&O Small Equipment and Tool Storage Building Capital Costs 400,000 - - - - - 400,000 Funding Sources: Operating Transfer -Water 100,000 - - - - - 100,000 Operating Transfer -Sewer 100,000 - - - - - 100,000 Operating Transfer -Storm 100,000 - - - - - 100,000 Equip. Rental Fund 100,000 - - - - - 100,000 5 M&O Lunchroom Expansion Capital Costs 150,000 - - - - - 150,000 Funding Sources: Equip. Rental Fund 150,000 - - - - - 150,000 6 City Hall Annex Long-Term Debt 659,426 658,527 661,780 662,680 662,680 662,130 3,967,223 Funding Sources: Capital Improv. Fund - - - - - - - REET 1 659,426 658,527 661,780 662,680 662,680 662,130 3,967,223 Subtotal, Non-Capacity Projects: Capital Costs 970,000 600,000 - - - - 1,570,000 SUMMARY: CAPITAL COSTS Non-Capacity Projects 970,000 600,000 - - - - 1,570,000 Long-Term Debt 659,426 658,527 661,780 662,680 662,680 662,130 3,967,223 Total Costs 1,629,426 1,258,527 661,780 662,680 662,680 662,130 5,537,223 FUNDING SOURCES: Equip. Rental Fund 670,000 600,000 - - - - 1,270,000 Operating Transfer -Water 100,000 - - - - - 100,000 Operating Transfer -Sewer 100,000 - - - - - 100,000 Operating Transfer -Storm 100,000 - - - - - 100,000 REET 1 659,426 658,527 661,780 662,680 662,680 662,130 3,967,223 Total Funding 1,629,426 1,258,527 661,780 662,680 662,680 662,130 5,537,223 City of Auburn Capital Facilities Plan 200 EQUIPMENT RENTAL FUND (550)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: M&O Vehicle Storage Bay Improvements Project No:cp0711 Project Type: Project Manager:Randy Bailey Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Equip. Rental Revenue 5,451 - 100,000 100,000 105,451 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - 5,451 - 100,000 100,000 105,451 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 5,451 100,000 100,000 105,451 5,451 - 100,000 100,000 105,451 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 200,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 200,000 - - - - 200,000 Grants / Other Sources: Non-Capacity Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Enclose the 8 existing bays to provide necessary weather protection for street sweepers, vactors, sanding, and snow plow equipment. Construct storage shed to facilitate removal of portable containers, improving space utilization and traffic flow throughout M&O. Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 201 EQUIPMENT RENTAL FUND (550)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Equipment Rental Vehicle Maintenance Bay Project No:cp1223 Project Type: Project Manager:Randy Bailey Description: Activity: 2014 YE 2015 Year End 2016 Year End Funding Sources:Prior to 2014 Estimate Project Total Project Total Unrestricted Equip. Rental Revenue 29,276 - 250,000 250,000 279,276 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - 29,276 - 250,000 250,000 279,276 Capital Expenditures: Design - - - Right of Way - - - Construction 29,276 - 250,000 250,000 279,276 29,276 - 250,000 250,000 279,276 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 500,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 500,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 500,000 - - - - 500,000 Grants / Other Sources: Non-Capacity Build additional vehicle bay at Equipment Rental shop for heavy equipment and large vehicles to improve efficiency and remove choke points. Adding a large vehicle bay with a large vehicle lift will enable us to perform inspections and maintenance on more than one large vehicle at a time, this becomes extremely important during emergency operations such as snow and ice events. The City currently has 2.5 maintenance bays, this project will add one more maintenance bay for a total of 3.5 bays. Progress Summary: Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 202 NAME OF FUND/DEPT Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: M&O Fuel Tank Replacement Project No:cpxxxx Project Type: Project Manager:Randy Bailey Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Equip. Rental Revenue - - 70,000 250,000 70,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - 70,000 250,000 70,000 Capital Expenditures: Design - - 70,000 - 70,000 Right of Way - - - - - Construction - - - 250,000 - - - 70,000 250,000 70,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 320,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 320,000 Capital Expenditures: Design - - - - 70,000 Right of Way - - - - - Construction - - - - 250,000 - - - - 320,000 Grants / Other Sources: None Non-Capacity Replace our three 10,000 gallon underground tanks with new above ground tanks. Our existing tanks were installed in 1989 and they are single wall fiberglass tanks. The City's current insurance carrier will not insure these tanks once they become 25 years old which will occur in 2014. The city is looking at other insurance options that may remove this age restriction. It will be a benefit to the City to have the tanks above ground in the future due to the reduced maintenance and inspection cost. Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 203 NAME OF FUND/DEPT Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: M&O Small Equipment and Tool Storage Building Project No:cpxxxx Project Type: Project Manager:Randy Bailey Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Equip. Rental Revenue - - 100,000 100,000 Operating Transfer- Water - - 100,000 - 100,000 Operating Transfer- Sewer - - 100,000 - 100,000 Operating Transfer- Storm - - 100,000 - 100,000 - - 400,000 - 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 400,000 - 400,000 - - 400,000 - 400,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 100,000 Operating Transfer- Water - - - - 100,000 Operating Transfer- Sewer - - - - 100,000 Operating Transfer- Storm - - - - 100,000 - - - - 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 400,000 - - - - 400,000 Grants / Other Sources: None Non-Capacity Construction of a permanent building to replace the 7 aging cargo containers. The cargo containers were a temporary, inexpensive storage solution but the space layout is very inefficient and they are difficult to maintain. The new structure would be complete with electrical, plumbing and insulation. Water, Sewer, Storm and Equipment Rental will use this building for storage of small tools and equipment. Progress Summary: This project will be designed and built in 2015. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 204 NAME OF FUND/DEPT Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: M&O Lunchroom Expansion Project No:cpxxxx Project Type: Project Manager:Randy Bailey Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Equip. Rental Revenue - - 150,000 - 150,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - 150,000 - 150,000 Capital Expenditures: Design - - 45,000 - 45,000 Right of Way - - - - - Construction - - 105,000 - 105,000 - - 150,000 - 150,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 150,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 150,000 Capital Expenditures: Design - - - - 45,000 Right of Way - - - - - Construction - - - - 105,000 - - - - 150,000 Grants / Other Sources: None Non-Capacity Expansion of the current lunchroom by redesigning the area to accommodate All-Staff meetings, provide for a training facility, lunch room and also serve as the Department Operations Center (DOC) during an emergency event. In addition, the design would include sliding doors which would allow the area to serve two purposes at once, for example, one half of the room being used as a DOC and the other half open to employees to use as a lunch/break room. Progress Summary: This project will be designed and built in 2015 Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 205 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: City Hall Annex Project No: Project Type: Project Manager: Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 1,289,400 645,200 659,426 658,527 2,594,026 1,289,400 645,200 659,426 658,527 2,594,026 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 1,289,400 645,200 659,426 658,527 2,594,026 1,289,400 645,200 659,426 658,527 2,594,026 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 661,780 662,680 662,680 662,130 3,967,223 661,780 662,680 662,680 662,130 3,967,223 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 661,780 662,680 662,680 662,130 3,967,223 661,780 662,680 662,680 662,130 3,967,223 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: To pay scheduled debt service costs on 2010 General Obligation bonds issued for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 206 City of Auburn Capital Facilities Plan 207 COMMUNITY IMPROVEMENTS Current Facilities Community Improvements include sidewalk and traffic signal improvements, public art and phase 2 of the Auburn Environmental Park Boardwalk project. Level of Service (LOS) No Level of Service for community improvement projects have been identified at this time. Capital Facilities Projects and Financing The City’s proposed Community Improvements include thirteen capital projects at a cost of $3,961,188 and debt service at a cost of 1,361,973 for a total of $5,323,161. Table CI-2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets As Table CI-3 shows, operating budget impacts of $43,000 are forecasted for community improvement facilities during the six years 2016-2021. City of Auburn Capital Facilities Plan 208 TABLE CI-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COMMUNITY IMPROVEMENTS 2015 2016 2017 2018 2019 2020 Total Capacity Projects: 1 8th Street NE & C Street NW ITS Improvements Capital Costs 5,000 - - - - - 5,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 5,000 - - - - - 5,000 Subtotal, Capacity Projects: Capital Costs 5,000 - - - - - 5,000 Non-Capacity Projects: 2 Citywide Sidewalk Repairs & Improvements Capital Costs 325,000 325,000 125,000 125,000 125,000 125,000 1,150,000 Funding Sources: Capital Improvement Fund 25,000 25,000 25,000 25,000 25,000 25,000 150,000 REET2 200,000 200,000 - - - - 400,000 Grants (Fed, State, Local)100,000 100,000 100,000 100,000 100,000 100,000 600,000 3 Annual Traffic Signal Improvements Capital Costs 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 4 Mohawks Plastics Site Mitigation Project Capital Costs 25,000 20,000 20,000 65,000 20,000 - 150,000 Funding Sources: Capital Improvement Fund - - - - - - - Other (Fund 124 -Traffic Imp.)25,000 20,000 20,000 65,000 20,000 - 150,000 REET 2 - - - - - - - 5 Public Art Capital Costs 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Funding Sources: Capital Improvement Fund - - - - - - - Grants - - - - - - - REET 2 30,000 30,000 30,000 30,000 30,000 30,000 180,000 6 City Wetland Mitigation Projects Capital Costs - 20,790 7,694 7,694 7,694 7,696 51,568 Funding Sources: Capital Improvement Fund - - - - - - - REET 1 - - - - - - - Other (Fund 124-Wetland Mit.)- 20,790 7,694 7,694 7,694 7,696 51,568 7 Auburn Environmental Park Boardwalk -Phase 2 Capital Costs 75,000 - 800,000 - - - 875,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 75,000 - - - - - 75,000 Grants - - 550,000 - - - 550,000 Other -To Be Determined - - 250,000 - - - 250,000 8 Downtown Wayfinding Program Capital Costs 90,000 30,000 - - - - 120,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 90,000 30,000 - - - - 120,000 City of Auburn Capital Facilities Plan 209 TABLE CI-2 (continued) 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 9 Green River Park Design Capital Costs 75,000 - - - - - 75,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 75,000 - - - - - 75,000 10 Les Gove Campus Master Plan Capital Costs 75,000 - - - - - 75,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 75,000 - - - - - 75,000 11 Main Street Streetscape Urban Design Capital Costs 70,000 - - - - - 70,000 Funding Sources: Local Revitalization Fund 70,000 - - - - - 70,000 Grants - - - - - - - 12 City Downtown Public Parking Lot Reconfiguration Capital Costs 159,620 - - - - - 159,620 Funding Sources: Local Revitalization Fund 159,620 - - - - - 159,620 Grants - - - - - - - 13 Local Revitalization Long Term Debt 222,942 223,091 225,210 224,810 228,610 237,310 1,361,973 Funding Sources: REET 2 222,942 223,091 225,210 224,810 228,610 237,310 1,361,973 Subtotal, Non-Capacity Projects: Capital Costs 1,099,620 600,790 1,157,694 402,694 357,694 337,696 3,956,188 SUMMARY: CAPITAL COSTS Capacity Projects 5,000 - - - - - 5,000 Non-Capacity Projects 1,099,620 600,790 1,157,694 402,694 357,694 337,696 3,956,188 Long-Term Debt 222,942 223,091 225,210 224,810 228,610 237,310 1,361,973 Total Costs 1,327,562 823,881 1,382,904 627,504 586,304 575,006 5,323,161 FUNDING SOURCES: Capital Improvement Fund 328 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Local Revitalization Fund 330 229,620 - - - - - 229,620 Grants 100,000 100,000 650,000 100,000 100,000 100,000 1,150,000 REET 2 947,942 658,091 430,210 429,810 433,610 442,310 3,341,973 Other -To Be Determined - - 250,000 - - - 250,000 Other (Fund 124 -Traffic Imp.)25,000 20,000 20,000 65,000 20,000 - 150,000 Other (Fund 124-Wetland Mit.)- 20,790 7,694 7,694 7,694 7,696 51,568 Total Funding 1,327,562 823,881 1,382,904 627,504 586,304 575,006 5,323,161 City of Auburn Capital Facilities Plan 210 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: 8th Street NE and C Street NW ITS Improvements TIP # 52 Project No:cp1226 Project Type:Capacity Project Manager:Matt Larson LOS Corridor ID# 18, 19 Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET2 - 50,000 5,000 - 55,000 Traffic Impact Fees - - - - - Other - - - - - - 50,000 5,000 - 55,000 Capital Expenditures: Design - 10,000 - - 10,000 Right of Way - - - - - Construction - 40,000 5,000 - 45,000 - 50,000 5,000 - 55,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET2 - - - - 5,000 Traffic Impact Fees - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project will expand the City's ITS network to improve travel reliability, maintenance response, and emergency management capabilities. The project includes the design, coordination, permitting, and construction of the ITS expansion on the 8th Street NE/Lea Hill Road corridor and at the C Street NW/W Main Street, C Street NW/3rd Street NW, and A Street NW/3rd Street NW intersections. Progress Summary: Project is planned to be completed in 2014. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $500. City of Auburn Capital Facilities Plan 211 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Citywide Sidewalk Repairs & Improvements TIP #32 Project No:cp1301 Project Type:Non-Capacity (Annual) Project Manager:Jai Carter LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - 25,000 25,000 25,000 Grants -Unsecured State - - 100,000 100,000 100,000 REET 2 - - 200,000 200,000 200,000 Other - - - - - - - 325,000 325,000 325,000 Capital Expenditures: Design - 15,000 15,000 15,000 Right of Way - - Construction - 310,000 310,000 620,000 - - 325,000 325,000 325,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance 25,000 25,000 25,000 25,000 150,000 Grants -Unsecured State 100,000 100,000 100,000 100,000 600,000 REET 2 - - - - 400,000 Other - - - - - 125,000 125,000 125,000 125,000 1,150,000 Capital Expenditures: Design 15,000 15,000 15,000 15,000 90,000 Right of Way - Construction 110,000 110,000 110,000 110,000 1,060,000 125,000 125,000 125,000 125,000 1,150,000 Grants / Other Sources: Grant funds are not secure Description: Project funds sidewalk improvements at multiple locations throughout the City. A sidewalk inventory was completed in 2004. Annual projects are selected based upon criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian corridor or "linkage", connectivity to transit service, ADA requirements, and "Save our Streets" (SOS) project locations. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 212 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Annual Traffic Signal Replacement & Improvements TIP #34 Project No:Various Project Type:Non-Capacity (Annual) Project Manager:TBD LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 - 175,000 175,000 175,000 350,000 Other - - - - - - 175,000 175,000 175,000 350,000 Capital Expenditures: Design - 25,000 25,000 25,000 50,000 Right of Way - - - - - Construction - 150,000 150,000 150,000 300,000 - 175,000 175,000 175,000 350,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 175,000 175,000 175,000 175,000 1,050,000 Other - - - - - 175,000 175,000 175,000 175,000 1,050,000 Capital Expenditures: Design 25,000 25,000 25,000 25,000 150,000 Right of Way - - - - - Construction 150,000 150,000 150,000 150,000 900,000 175,000 175,000 175,000 175,000 1,050,000 Grants / Other Sources: Description: This project includes replacing traffic signal cabinets and equipment, video detection cameras and pedestrian pushbuttons. This project will also make safety improvements to our signals including auxiliary heads and flashing yellow arrows, or capacity improvements such as right-turn overlap signals. The City uses current traffic counts and collision data to determine the intersections to improve. Progress Summary: The project is ongoing and continues to successfully complete annual traffic signal improvement projects citywide. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 213 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Mohawks Plastics Site Mitigation Project TIP #13 Project No:cp0767 Project Type: Non-Capacity Project Manager: Jeff Dixon/Matt Larson LOS Corridor ID# N/A Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Traffic Impact Fees 469,855 25,000 25,000 20,000 519,855 REET 2 76,368 - - - 76,368 546,223 25,000 25,000 20,000 596,223 Capital Expenditures: Design 170,706 - - - 170,706 Right of Way - - - - - Construction 375,517 25,000 25,000 20,000 425,517 546,223 25,000 25,000 20,000 596,223 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Traffic Impact Fees 20,000 65,000 20,000 150,000 REET 2 - - - - - 20,000 65,000 20,000 - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 20,000 65,000 20,000 150,000 20,000 65,000 20,000 - 150,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project consists of the design, construction, maintenance and monitoring of approximately 2.2-acres of wetland creation and approximately 0.4-acres of wetland enhancement within the Goedecke South Property owned by the Sewer Utility in order to compensate for approximately 1.6-acre wetland loss on the Mohawk Plastics property (Parcel # 1321049056). The project was approved under an existing agreement approved by Resolution No. 4196, June 2007. Progress Summary: The City received the DOE WQ Certification, WDFW HPA, and on May 7, 2009, the Army Corps of Engineers (Corps) 404 wetland permit (NWS-2007-1913). Subsequently, bid specifications and construction plans were prepared and construction began in October 2009. Construction was completed in January 2010 and the project is currently within the 10- year monitoring period, which involves annual maintenance, monitoring and reporting. Future Impact on Operating Budget: It is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a period of 10 years, in conformance with permit requirements. After the successful conclusion of this 10- year monitoring period, which is anticipated to be in December 2019, ongoing operation expenses should be minimal. City of Auburn Capital Facilities Plan 214 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Public Art Project No: gcbd02 Project Type: Project Manager: Krueger Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance 22,000 - - 22,000 Grants - Secured (Fed,State,Local)- - - - - REET 2 30,000 30,000 30,000 30,000 90,000 Other - - - - - 30,000 52,000 30,000 30,000 112,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 52,000 30,000 30,000 142,000 30,000 52,000 30,000 30,000 112,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 30,000 30,000 30,000 30,000 180,000 Other - - - - - 30,000 30,000 30,000 30,000 180,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 30,000 30,000 30,000 180,000 30,000 30,000 30,000 30,000 180,000 Grants / Other Sources: None The City designates $30,000 annually toward the purchase of public art, for placement at designated locations throughout the City. Progress Summary: Arts Commission will meet to assess future needs and seek approval from City Council on placement. Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 215 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: City Wetland Mitigation Projects Project No:cp1315 Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Fund 124 Wetland Mitigation Account 4,355 - 20,790 25,145 REET - - - - - 4,355 - - 20,790 25,145 Capital Expenditures: Design - - - 4,000 4,000 Right of Way - - - 12,090 12,090 Construction 4,355 - - 4,700 4,700 4,355 - - 20,790 20,790 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Fund 124 Wetland Mitigation Account 7,694 7,694 7,694 7,696 51,568 REET - - - - - 7,694 7,694 7,694 7,696 51,568 Capital Expenditures: Design - - - - 4,000 Right of Way - - - - 12,090 Construction 7,694 7,694 7,694 7,696 30,778 7,694 7,694 7,694 7,696 51,568 Grants / Other Sources: This project designs and constructs off-site wetland mitigation in the Auburn Environmental Park for participating development projects as approved through the City's development review process. Design, construction, monitoring, and maintenance of the mitigation is funded through wetland mitigation fees collected by the City. Progress Summary: Future Impact on Operating Budget: After construction, each wetland mitigation site is monitored and maintained for a period of three to ten years, depending on the specific requirements for the project. Funding for future year monitoring and maintenance is included in the development fees collected by the City, and is budgeted as part of the Capital Facilities Plan. Construction and monitoring are ongoing. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 216 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Auburn Environmental Park Boardwalk - Phase 2 Project No:cpxxxx Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - Grants - Unsecured State - - - - - REET 2 - - 75,000 - 75,000 Other -TBD - - - - - 75,000 - 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Right of Way - - - - - Construction - - - - - - - 75,000 - 75,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - Grants - Unsecured State 550,000 - - - 550,000 REET 2 - - - - 75,000 Other -TBD 250,000 250,000 800,000 - - - 875,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction 800,000 - - - 800,000 800,000 - - - 875,000 Grants / Other Sources: The Auburn Environmental Park (AEP) provides vegetated natural open space within an urbanized area. The AEP provides opportunities for local economic development, water quality improvement, storm water detention, flood control, fish and wildlife enhancement, visual resources, public education, and passive recreation, including walking trails and bird viewing amenities. In 2012, the City completed the construction of approximately 1,200 lineal feet of the first phase (Phase 1) of an elevated boardwalk trail in the Auburn Environmental Park (AEP). This trail extended from West Main Street through existing wetlands in the AEP terminating at the base of the Bird Viewing Tower constructed in 2009. As part of the construction of the elevated boardwalk, the City also installed interpretative signage, bench seating, limited new vehicle parking on Western Avenue and over two acres of wetland species of trees, plants and shrubs. Phase 2 of the elevated boardwalk trail would construct a combination of approximately 2,000 lineal feet of surface trail and elevated boardwalk trail from the current terminus at the Bird Viewing Tower to a connection with the Interurban Trail. The Phase 2 project will further previous and current Councils’ visions of the AEP providing passive recreation and environmental education opportunities for all Auburn citizens. Progress Summary: This is a new capital improvement proposal. Future Impact on Operating Budget: Construction of the Phase 2 project is anticipated to incur approximately $10,000 in annual operating costs to the City’s operating budget. This operating cost is covered in existing program improvement funding for the Environmental Services portion of the Community Development and Public Works Department budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 217 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Downtown Wayfinding Program Project No:cpxxxx Project Type:Non-Capacity Project Manager:Elizabeth Chamberlain Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Fund Balance - - - - - REET 2 - - 90,000 30,000 90,000 Other - - - - - - - 90,000 30,000 30,000 Capital Expenditures: Design - - 8,000 15,000 8,000 Right of Way - - - - - Construction - - 82,000 15,000 82,000 - - 90,000 30,000 90,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - REET 2 - - - - 120,000 Other - - - - - - - - - 120,000 Capital Expenditures: Design - - - - 23,000 Right of Way - - - - - Construction - - - - 97,000 - - - - 120,000 Grants / Other Sources: Phase 1: The downtown Pedestrian Kiosks were developed in 2012 as a result of additional funding being available through Local Revitalization Financing. Nine locations were selected within Downtown Auburn for a pedestrian kiosk to be constructed. With the budget available, three kiosks were constructed in 2013 at the Interurban Trail, Sound Transit Plaza, and at 1st Street/South Division Street. Phase 1 proposes construction of three additional kiosks in 2015. Phase 2: Develop an updated wayfinding program, both pedestrian and vehicular, that would initially begin within Downtown Auburn that could then be expanded Citywide. The current vehicular wayfinding program is lacking in aesthetic appeal, does not coordinate with the vision for Downtown Auburn, and needs refreshing. A design and color scheme have been established with the pedestrian kiosk design that an updated wayfinding program can build upon. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 218 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Green River Park Design Project No:cpxxxx Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 - - 75,000 75,000 - - 75,000 - 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Construction - - - - - Long-Term Debt Service - - - - - - - 75,000 - 75,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 2 - - - - 75,000 - - - - 75,000 Capital Expenditures: Design - - - - 75,000 Construction - - - - - Long-Term Debt Service - - - - - - - - - 75,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project provides funding to complete of a Green River Park Master Plan. The City has recently received, via a property transfer from King County and the State of Washington, the riverfront property located along a bend in the Green River between 102nd and 104th Ave SE. These two parcels comprise an approximate 14 acre site, intended to be developed for public use. This future park continues more than 1,000 feet of water access. Much of the property is subject to shoreline regulations as well as other restrictions. Community input is vital to the long-term vision and success of the property. Progress Summary: Future Impact on Operating Budget: No impact on the Parks Department Operating Budget. The City's funding of a Park Master Plan for this site is critical in an effort to receive grant funding and can be a reimbursable expense should funding be allocated for construction for the proposed park site. City of Auburn Capital Facilities Plan 219 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Les Gove Campus Master Plan Project No:cpxxxx Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 - - 75,000 - 75,000 - - 75,000 - 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Construction - - - - - Long-Term Debt Service - - - - - - - 75,000 - 75,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 2 - - - - 75,000 - - - - 75,000 Capital Expenditures: Design - - - - 75,000 Construction - - - - - Long-Term Debt Service - - - - - - - - - 75,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project provides the funding to complete a Les Gove Campus Master Plan made necessary by the recent acquisition of the Herr Properties and the proposed construction of the Community and Youth/Teen Center. This plan will consider recreational opportunities; potential community uses; traffic patterns affecting the Les Gove neighborhood; park user, pedestrian, and vehicular safety. The plan will also examine potential City uses and options such as demolition or repurposing of property. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for Parks and Recreation, but will make the City eligible for grant funding. City of Auburn Capital Facilities Plan 220 LOCAL REVITALIZATION FUND (330)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Main Street Streetscape Urban Design Project No:cpxxxx Project Type: Non-Capacity Project Manager: Elizabeth Chamberlain Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Local Revitalization Fund 330 - 110,000 70,000 - 180,000 Grants- Secured (Fed,State,Local)- - - - - Other (GO Bond)- - - - - - 110,000 70,000 - 180,000 Capital Expenditures: Design - 110,000 70,000 - 180,000 Right of Way - - - - Construction - - - - - - 110,000 70,000 - 180,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Local Revitalization Fund 330 - - - - 70,000 Grants- Secured (Fed,State,Local)- - - - - Other (GO Bond)- - - - - - - - - 70,000 Capital Expenditures: Design - - - - 70,000 Right of Way - - - - - Construction - - - - - - - - - 70,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: None anticipated. Develop an urban design concept for Main Street from C Street NW/SW to F Street NE/SE. The design would primarily look at the street environment of Main Street and how the existing buildings will interface with the street. The project will also look at geotechnical analysis of the soil conditions within the Main Street right-of-way as well as preliminary design of utilities in order to develop a cost estimate for a future construction project. Construction is not part of this project. It is anticipated that future budget or grant funding will be sought for the detailed design and construction phases. Progress Summary: Consultant selection is underway. Anticipate beginning the urban design work in 2014 and completing this phase in 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 221 LOCAL REVITALIZATION FUND (330)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: City Downtown Public Parking Lot Reconfiguration Project No: cpxxxx Project Type: Non-Capacity Project Manager: Elizabeth Chamberlain Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Local Revitalization Fund 330 - 220,000 159,620 - 379,620 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Other (GO Bonds)- - - - - - 220,000 159,620 - 379,620 Capital Expenditures: Design 125,867 - - 125,867 Right of Way - 94,133 159,620 - 253,753 Construction - - - - - - 220,000 159,620 - 379,620 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Local Revitalization Fund 330 - - - - 159,620 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Other (GO Bonds)- - - - - - - - - 159,620 Capital Expenditures: Design - - - - - Right of Way - - - - 159,620 Construction - - - - - - - - - 159,620 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Reconfigure the City owned public parking lot between Safeway and Main Street to address pedestrian and vehicular circulation; remove existing landscaping to allow more flexibility in the parking lot redesign; explore whether more parking stalls can be added to the lot to aid in providing additional customer parking within Downtown Auburn; and resurface the parking lot. Progress Summary: Begin design in 2014 with construction potentially starting towards the end of 2014 and completion in 2015. Future Impact on Operating Budget: None anticipated as the City already maintains the parking lot. City of Auburn Capital Facilities Plan 222 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Capital Projects Fund Project Title: Local Revitalization Project No: Project Type: Project Manager: Description: Activity: (Previous 2 Yrs)2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Cap Improve - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 299,132 217,100 222,942 223,091 739,174 299,132 217,100 222,942 223,091 739,174 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 299,132 217,100 222,942 223,091 739,174 299,132 217,100 222,942 223,091 739,174 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 2 225,210 224,810 228,610 237,310 1,361,973 225,210 224,810 228,610 237,310 1,361,973 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 225,210 224,810 228,610 237,310 1,361,973 225,210 224,810 228,610 237,310 1,361,973 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: To pay debt service costs on 2010 General Obligation bonds issued for the Downtown Promenade Improvements. Local Revitalization financing is a credit on the State's portion of sales tax that the City will receive through 2035. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 223 TABLE CI-3 Impact on Future Operating Budgets COMMUNITY IMPROVEMENTS Project:2016 2017 2018 2019 2020 2021 Total 1 8th St NE & C St NW ITS Improvements 500$ 500$ 500$ 500$ 500$ 500$ 3,000$ 2 Citywide Sidewalk Repair & Improvement - - - - - - - 3 Traffic Signal Improvements - - - - - - - 4 Mohawks Plastics Site Mitigation - - - - - - - 5 Public Art - - - - - - - 6 City Wetland Mitigation Projects - - - - - - - 7 AEP Boardwalk -Phase 2 - - 10,000 10,000 10,000 10,000 40,000 8 Downtown Wayfinding Program - - - - - - - 9 Green River Park Design - - - - - - - 10 Les Gove Campus Master Plan - - - - - - - 11 Main St. Streetscape Urban Design - - - - - - - 12 City Downtown Public Parking Lot Reconfiguration - - - - - - - 13 Local Revitalization - - - - - - - Total 500$ 500$ 10,500$ 10,500$ 10,500$ 10,500$ 43,000$ City of Auburn Capital Facilities Plan 224 City of Auburn Capital Facilities Plan 225 AIRPORT Current Facilities The City of Auburn operates the Auburn Municipal Airport, providing hangar and tie-down facilities/leasing space for aircraft-related businesses. As of 2010, there were approximately 141,000 take-offs and landings (aircraft operations) at the airport annually. Table A-1 “Facilities Inventory” lists the facilities with current capacity and location. Currently the Airport is in the process of updating the Master Plan which will be completed in 2014. Level of Service (LOS) The Auburn Municipal Airport Master Plan Update 2001–2020 provides a maximum runway capacity (LOS standard) of 231,000 aircraft operations annually; one take-off or landing equals one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA). The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways, holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100% of aircraft operations during any one year. By 2020 the Airport Master Plan forecasts the number of operations to be 193,189 – well below the capacity of the airport runway. Capital Facilities Projects and Financing The City’s Airport facilities include thirteen non-capacity capital projects at a cost of $ 3,893,170. These projects include the South T-Hangar Row 3 enclosure, runway extension project and land acquisition for future approaches. Table A-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating expense budget impacts forecast for the airport during the six years 2016 – 2021. The South T-Hangar Row 3 enclosure project is anticipated to increase the hangar rental revenue by approximately $60,000 per year beginning in 2016. TABLE A-1 Facilities Inventory Airport FACILITY # of Aircraft # of Feet LOCATION Existing Inventory: Hangars 145 400 23rd Street NE Tiedowns 214 400 23rd Street NE Air Strip 3,400 400 23rd Street NE Total Existing Inventory 359 3,400 Proposed Capacity Projects: 2020 Land Acquisition 30 400 23rd Street NE 2017 Runway Extension - 718 400 23rd Street NE Total Proposed Capacity Projects 30 718 2020 Projected Inventory Total 389 4,118 CAPACITY City of Auburn Capital Facilities Plan 226 TABLE A-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING AIRPORT 2015 2016 2017 2018 2019 2020 Total Capacity Projects: None - Non-Capacity Projects: 1 Airport Security Camera & Gate Access Upgrades Capital Costs - - - - - 70,000 70,000 Funding Sources: Airport Fund - - - - - 3,500 3,500 Grant - - - - - 66,500 66,500 2 South T- Hangar Row 3 Enclosure Capital Costs 347,000 - - - - - 347,000 Funding Sources: Airport Fund 347,000 - - - - - 347,000 Grant - - - - - - - 3 Obstruction Survey for NexGen/GPS Approach Capital Costs 210,000 - - - - - 210,000 Funding Sources: Airport Fund 10,500 - - - - - 10,500 Grant 199,500 - - - - - 199,500 4 Land Acquisition for Future Approaches Capital Costs - - 420,000 - - - 420,000 Funding Sources: Airport Fund - - 21,000 - - - 21,000 Grants - - 399,000 - - - 399,000 5 Wildlife Hazard Assessment Capital Costs 16,125 - - - - - 16,125 Funding Sources: Airport Fund 806 - - - - - 806 Grants 15,319 - - - - - 15,319 6 Runway Enhancements Capital Costs 161,000 140,000 1,064,000 - - - 1,365,000 Funding Sources: Airport Fund 8,050 7,000 53,200 - - - 68,250 Grants 152,950 133,000 1,010,800 - - - 1,296,750 7 Automated Weather Observation System Capital Costs - - - - 268,800 - 268,800 Funding Sources: Airport Fund - - - - 13,440 - 13,440 Grants - - - - 255,360 - 255,360 8 Fuel Farm Capital Costs - - 140,000 - - - 140,000 Funding Sources: Airport Fund - - 140,000 - - - 140,000 Grants - - - - - - - City of Auburn Capital Facilities Plan 227 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 9 Land Acquisition Capital Costs - - - - - 735,205 735,205 Funding Sources: Airport Fund - - - - - 36,760 36,760 Grants - - - - - 698,445 698,445 10 Precision Approach Path Indicator (PAPI) for Runway Capital Costs - - - - - 168,000 168,000 Funding Sources: Airport Fund - - - - - 8,400 8,400 Grants - - - - - 159,600 159,600 11 West Side Fencing Capital Costs - - - - 52,920 - 52,920 Funding Sources: Airport Fund - - - - 2,646 - 2,646 Grants - - - - 50,274 - 50,274 12 General Repair & Maintenance Capital Costs 50,000 - - - - - 50,000 Funding Sources: Airport Fund 50,000 - - - - - 50,000 Grants - - - - - - - 13 Taxiway Seal Coat & Restripe Capital Costs - - - - - 50,120 50,120 Funding Sources: Airport Fund - - - - - 2,506 2,506 Grants - - - - - 47,614 47,614 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 784,125 140,000 1,624,000 - 321,720 1,023,325 3,893,170 Total Costs 784,125 140,000 1,624,000 - 321,720 1,023,325 3,893,170 FUNDING SOURCES: Airport Fund 416,356 7,000 214,200 - 16,086 51,166 704,808 Grants (Fed,State,Local)367,769 133,000 1,409,800 - 305,634 972,159 3,188,362 Total Funding 784,125 140,000 1,624,000 - 321,720 1,023,325 3,893,170 City of Auburn Capital Facilities Plan 228 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Airport Security Camera & Gate Access Upgrades Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Secured - - - - - State Grant -Secured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - 3,500 3,500 Federal Grant -Secured - - - 63,000 63,000 State Grant -Secured - - - 3,500 3,500 - - - 70,000 70,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 70,000 70,000 - - - 70,000 70,000 Grant / Other Sources:Federal Aviation Administration Increased security identified by the Federal Aviation Administration and the Transportation Security Administration for Airport control access gates (both vehicle and personnel). This project will install security cameras and replace the obsolete gate operator access control units. The proposed system will include cards and keypad operation with both inbound and outbound tracking of the authorized tenant/guest. Personnel gates will also have the same system. Progress Summary: Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 229 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: South T- Hangar Row 3 Enclosure Project No:cp1408 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - 10,000 347,000 - 357,000 Grants (Fed,State,Local)- - - - - Other - - - - - - 10,000 347,000 - 357,000 Capital Expenditures: Design - 10,000 - - 10,000 Right of Way - - - - - Construction - - 347,000 - 347,000 - 10,000 347,000 - 357,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - - 347,000 Grants (Fed,State,Local)- - - - - Other - - - - - - - - - 347,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 347,000 - - - - 347,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The airport currently has vacant open T-Hangars, but the airport has 100% occupancy on closed T-Hangars including a wait list for closed T-Hangars. This project proposes seventeen open T-hangars be upgraded to closed T-hangars. Progress Summary: Design and engineering was completed in 2014 and construction will begin in 2015. Future Impact on Operating Budget: This project is anticipated to increase hangar rental revenue by approximately $60,000 per year beginning in 2016. City of Auburn Capital Facilities Plan 230 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Obstruction Survey for NexGen/GPS Approach Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - 10,500 - 10,500 Federal Grant -Secured - - 189,000 - 189,000 State Grant -Secured - - 10,500 - 10,500 - - 210,000 - 210,000 Capital Expenditures: Design - - 210,000 - 210,000 Right of Way - - - - - Construction - - - - - - - 210,000 - 210,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - - 10,500 Federal Grant -Secured - - - - 189,000 State Grant -Secured - - - - 10,500 - - - - 210,000 Capital Expenditures: Design - - - - 210,000 Right of Way - - - - - Construction - - - - - - - - - 210,000 Grant / Other Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Digital Obstruction Survey to lower landing minimums, provide more efficient approach procedure and remove night/circle restriction on existing approach. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 231 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Land Acquisition for Future Approaches Project No:cp***** Project Type: Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Acquisition - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue 21,000 - - - 21,000 Federal Grant -Unsecured 378,000 - - - 378,000 State Grant -Unsecured 21,000 - - - 21,000 420,000 - - - 420,000 Capital Expenditures: Design - - - - - Acquisition 420,000 - - - 420,000 Construction - - - - - 420,000 - - - 420,000 Grant / Other Sources: Non-Capacity Acquire land at the current Park and Ride for future approaches. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: None Total Funding Sources: City of Auburn Capital Facilities Plan 232 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Wildlife Hazard Assessment Project No:cp1321 Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue 476 2,218 806 - 3,500 Federal Grant -Secured 8,562 39,925 14,513 - 63,000 State Grant -Secured 476 2,218 806 - 3,500 9,514 44,361 16,125 - 70,000 Capital Expenditures: Design 9,514 44,361 16,125 - 70,000 Right of Way - - - - - Construction - - - - - 9,514 44,361 16,125 - 70,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - - 806 Federal Grant -Secured - - - - 14,513 State Grant -Secured - - - - 806 - - - - 16,125 Capital Expenditures: Design - - - - 16,125 Right of Way - - - - - Construction - - - - - - - - - 16,125 Grants / Other Sources:Federal Aviation Administration and Washington State Department of Transportation Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Federal Aviation Administration mandated wildfire hazard assessment for high volume airports. Progress Summary: Mead & Hunt began the Wildlife Assessment survey on December 2013. Surveys are conducted monthly until December 2014; and a report will be issued during 1st quarter 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 233 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Runway Enhancements Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - 8,050 7,000 8,050 Federal Grant -Unsecured - - 144,900 126,000 144,900 State Grant -Unsecured - - 8,050 7,000 8,050 - - 161,000 140,000 161,000 Capital Expenditures: Design - - - 140,000 - Environmental Assessment - - 161,000 - 161,000 Construction - - - - - - - 161,000 140,000 161,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue 53,200 - - - 68,250 Federal Grant -Unsecured 957,600 - - - 1,228,500 State Grant -Unsecured 53,200 - - - 68,250 1,064,000 - - - 1,365,000 Capital Expenditures: Design - - - - 140,000 Environmental Assessment - - - - 161,000 Construction 1,064,000 - - - 1,064,000 1,064,000 - - - 1,365,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Enhance Runway 16/34 per Airport Layout Plan & Master Plan Update for increased safety and utilization. Progress Summary: Environmental Assessment is planned for 2015. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 234 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Automated Weather Observation System Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - 13,440 - 13,440 Federal Grant -Unsecured - - 241,920 - 241,920 State Grant -Unsecured - - 13,440 - 13,440 - - 268,800 - 268,800 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 268,800 - 268,800 - - 268,800 - 268,800 Grants / Other Sources: Install weather reporting equipment for instrument approach. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 235 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Fuel Farm Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue 140,000 - - - 140,000 Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - 140,000 - - - 140,000 Capital Expenditures: Design 25,000 - - - 25,000 Right of Way - - - - - Construction 115,000 - - - 115,000 140,000 - - - 140,000 Grants / Other Sources: Construct a Fuel Farm for Jet A service at Airport Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 236 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Land Acquisition Project No:cp***** Project Type: Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Acquisition - - - - - Construction - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - 36,760 36,760 Federal Grant -Unsecured - - - 661,685 661,685 State Grant -Unsecured - - - 36,760 36,760 - - - 735,205 735,205 Capital Expenditures: Design - - - - - Acquisition - - - 735,205 735,205 Construction - - - - - - - - 735,205 735,205 Grant / Other Sources:Federal Aviation Administration None Non-Capacity Land Acquisition -Armstrong Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 237 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Precision Approach Path Indicator (PAPI) for Runway Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - 8,400 8,400 Federal Grant -Unsecured - - - 151,200 151,200 State Grant -Unsecured - - - 8,400 8,400 - - - 168,000 168,000 Capital Expenditures: Design - - - 20,000 20,000 Right of Way - - - - - Construction - - - 148,000 148,000 - - - 168,000 168,000 Grants / Other Sources: Install Precision Approach Path Indicator (PAPI) for Runway to replace aging VASI system. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 238 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: West Side Fencing Project No:cp**** Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - 2,646 - 2,646 Federal Grant -Unsecured - - 47,628 - 47,628 State Grant -Unsecured - - 2,646 - 2,646 - - 52,920 - 52,920 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 52,920 - 52,920 - - 52,920 - 52,920 Grants / Other Sources: Install Fence on West side of property Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 239 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: General Repair & Maintenance Project No:cpxxxx Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - 50,000 - 50,000 Federal Grant -Secured - - - - - State Grant -Secured - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 50,000 - 50,000 - - 50,000 - 50,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - - 50,000 Federal Grant -Secured - - - - - State Grant -Secured - - - - - - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 50,000 - - - - 50,000 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Various airport repairs and maintenance projects to be identified and prioritized as needed. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 240 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Taxiway Seal Coat & Restripe Project No:cpxxxx Project Type:Non-Capacity Project Manager:Shelley Coleman Description: Activity: 2014 YE 2015 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Secured - - - - - State Grant -Secured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2017 2018 2019 2020 2015-2020 Funding Sources: Unrestricted Airport Revenue - - - 2,506 2,506 Federal Grant -Secured - - - 45,108 45,108 State Grant -Secured - - - 2,506 2,506 - - - 50,120 50,120 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 50,120 50,120 - - - 50,120 50,120 Grants / Other Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will provide funding for seal coating and restriping of the taxiway that was replaced in 2009. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 241 CEMETERY Current Facilities The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (50 acres and five buildings) that provides burial services and related merchandise for the community. The Pioneer Cemetery is a historic cemetery which is no longer used for burial purposes. Table C-1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 30.03 burial plots/niches per 1,000 population is based on the existing inventory divided by the 2014 citywide population of 74,630. The proposed LOS of 40.80 burial plots/niches per 1,000 population is based on the projected inventory divided by the 2020 projected citywide population of 85,288. In addition, the cemetery will be able to offer a natural cremation garden. Capital Facilities Projects and Financing The CFP does not include any Cemetery capital facilities projects during 2015-2020. Impact on Future Operating Budgets There are no operating budget impacts forecast for the cemetery during the six years 2016 – 2021. TABLE C-1 Facilities Inventory Cemetery CAPACITY FACILITY # of Burial Plots/Niches LOCATION Existing Inventory: Mountain View Cemetery 2,241 2020 Mountain View Dr. Pioneer Cemetery - 8th & Auburn Way No. Total Existing Inventory 2,241 Proposed Capacity Projects: New Development - Burial Plots 475 Memory Heights New Development - Burial Plots 764 10th Addition Total Proposed Capacity Projects 1,239 2020 Projected Inventory Total 3,480 City of Auburn Capital Facilities Plan 242 City of Auburn Capital Facilities Plan 243 GOLF COURSE Current Facilities The City of Auburn owns and operates the 18-hole Auburn Municipal Golf Course. A PGA Class A professional is contracted to collect greens fees, operate the pro shop and snack bar, provide golf carts for rent, and offer a lesson program. Table GC-1 Facilities Inventory lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.24 holes per 1,000 population is based on the existing inventory divided by the 2014 citywide population of 74,630. The proposed LOS of 0.21 holes per 1,000 population is based on the projected inventory divided by the 2020 projected citywide population of 85,288. Capital Facilities Projects and Financing The CFP does not include any Golf Course capital facilities projects during 2015-2020. Impact on Future Operating Budgets There are no operating budget impacts forecast for new golf course facilities during the six years 2016 – 2021. TABLE GC-1 Facilities Inventory Golf Course CAPACITY FACILITY # of holes LOCATION Existing Inventory: Auburn Municipal Golf Course 18 29639 Green River Road Total Existing Inventory 18 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2019 Projected Inventory Total 18 City of Auburn Capital Facilities Plan 244 City of Auburn Capital Facilities Plan 245 POLICE Current Facilities The City of Auburn Police Department provides a full range of law enforcement services to the citizens of Auburn. All Divisions of the Auburn Police Department are housed at 340 East Main Street, Suite 201. The Divisions include Patrol, Investigations, Administrative Services, Inspectional Services, and Records. Level of Service (LOS) The City of Auburn Police Department contracts with SCORE, an outside entity, for housing of all misdemeanant inmates. Capital Facilities Projects and Financing The CFP does not include any Police capital facilities projects during 2015 - 2020. Impact on Future Operating Budgets The jail services expenses are dependent on the City’s contract agreement with SCORE. City of Auburn Capital Facilities Plan 246 City of Auburn Capital Facilities Plan 247 FIRE PROTECTION Current Facilities The Valley Regional Fire Authority provides fire protection and rescue services to a 25-square mile area which includes the City of Auburn, the City of Algona, the City of Pacific and King County Fire Protection District 31. The Valley Regional Fire Authority operates out of five stations, which are manned 24 hours per day. The North Station #31 also serves as the department headquarters and includes a hose and training tower. Each station is assigned fire apparatus (Engines and Aid Vehicles). Table F–1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.21 fire apparatus per 1,000 population is based on the existing inventory (16 fire apparatus) divided by the 2014 citywide population of 74,630. The proposed LOS of 0.20 fire apparatus per 1,000 is based on the 2020 planned inventory (17 fire apparatus) divided by the 2020 projected citywide population of 85,288. Capital Facilities Projects and Financing The Valley Regional Fire Authority includes one capital project at a cost of $510,000 for fire apparatus enhancements and improvements. Table F-2 shows the proposed financing plan followed by an individual worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for fire protection during the six years 2016 – 2021. City of Auburn Capital Facilities Plan 248 TABLE F-1 Facilities Inventory Valley Regional Fire Authority FACILITY Fire Apparatus Aid Vehicles LOCATION Existing Inventory: Stations: North Station #31 1101 'D' Street NE, Auburn First Line 1 1 Reserve 1 1 South Station #32 1951 'R' Street SE, Auburn First Line 1 1 Reserve 1 1 Lakeland Station #33 500 182nd Ave E, Auburn First Line 1 - Reserve 1 - Lea Hill Station #34 31290 124th Ave SE, Auburn First Line 1 - Reserve 1 - GSA Station #35 2815 C St SW, Auburn Reserve 1 1 Pacific Station #38 133 3rd Ave SE, Pacific First Line 1 - Reserve 1 - Total Existing Inventory 11 5 Proposed Inventory Additions: None 1 - Total Proposed Capacity Projects 1 - 2020 Projected Inventory Total 12 5 CAPACITY City of Auburn Capital Facilities Plan 249 TABLE F-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING VALLEY REGIONAL FIRE AUTHORITY 2015 2016 2017 2018 2019 2020 Total Non-Capacity Projects: 1 Fire Station Facility Relocation, Enhancements & Improvements Capital Costs 460,000 50,000 - - - - 510,000 Funding Sources: Grants - - - - - - - Bond Proceeds - - - - - - - Impact/Mitigation Fees 460,000 50,000 - - - - 510,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 460,000 50,000 - - - - 510,000 Total Costs 460,000 50,000 - - - - 510,000 FUNDING SOURCES: Cemetery Fund - - - - - - - Grants (Fed,State,Local)- - - - - - - Bond Proceeds 460,000 50,000 - - - - 510,000 Total Funding 460,000 50,000 - - - - 510,000 City of Auburn Capital Facilities Plan 250 Valley Regional Fire Authority Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Project Title: Fire Station Facility Relocation, Enhancements & Improvements Project No:cpxxxx Project Type: Project Manager:Mark Horaski Description: Activity: (Previous 2 Yrs.)2014 YE 2014 Year End Funding Sources:Prior to 2014 Estimate 2015 Budget 2016 Budget Project Total Grants - - - - - Bond Proceeds - - - - - Impact/Mitigation Fees 100,000 50,000 460,000 50,000 610,000 100,000 50,000 460,000 50,000 610,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 50,000 460,000 50,000 610,000 100,000 50,000 460,000 50,000 610,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Grants - - - - - Bond Proceeds - - - - - Impact/Mitigation Fees - - - - 510,000 - - - - 510,000 Capital Expenditures:- Design - - - - - Right of Way - - - - - Construction - - - - 510,000 - - - - 510,000 Facility Improvement projects are identified and prioritized annually and are subject to delay to accommodate emergency repairs. The Valley Regional Fire Authority includes one project in 2015 for apparatus enhancements and improvements. Progress Summary: Fire mitigation and impact fees will be transferred to the Valley Regional Fire Authority to pay for apparatus enhancements and improvements in 2015. Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: