Loading...
HomeMy WebLinkAboutActive Capital Projects Active 04-2015.pdfC410A CP0767 CP1107 CP1115 CP1118 CP1122 CP1202 CP1207 CP 1 2 0 7 CP1207 CP1024 CP1208 CP1208 CP1208 CP1208CP1208 CP1208 CP1208 CP1208 CP1208 CP1208 CP1208 C512A CP1219 CP 1 2 1 9 CP1219 CP0765 CP1119CP1218 C207A CP1217 C222A C229A CP1304 CP0915 CP1109 CP1308 CP1308 CP1308 CP1308 CP1308CP1308 C524A CP1312 CP1312 CP1316 CP1308 CP 1 4 0 2 CP 1 4 0 2 CP1402 CP1402 CP 1 4 0 2 CP1506 CP1402 CP1402 CP1402 CP1402CP 1 3 2 3 C P 1 4 0 2 CP1414 CP1406 CP1320 CP0764 CP1323 CP1312CP 1 3 2 3 CP1402 CP1402 CP1402 CP1402 CP1407 CP 1 3 2 4 CP1411 CP1411 CP1409 CP1417 C P 1 4 1 6 CP1415 CP1415 CP1415 CP 1 4 1 5 CP0915 CP 1 5 0 7 CP 1 5 0 7 CP 1 5 0 6 CP 1 5 0 6 CP1506 CP 1 5 0 6 CP 1 5 0 6 CP 1 4 1 4 CP1414 CP 1 4 1 4 CP 1 4 1 4 CP1412 CP1502 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 2015 ACTIVE CDPW CAPITAL IMPROVEMENT PROJECTS LEGEND: Construction Design SEWER PROJECTSTRANSPORTATION PROJECTS WATER PROJECTS STORM PROJECTS MISC PROJECTS Construction Design Construction Design Construction Design Construction Design ACTIVE PROJECTS CP1107 Fulmer Wellfield Improvement Project CP1122 30th St NE Storm Improvement - Phase 1 CP1202 Auburn Way So. Flooding Improvements-Phase 2 CP1207 D St Utilities Improvements CP1207 D St Utilities Improvements CP1207 D St Utilities Improvements CP1208 Sewer Pump Station Improvement ACTIVE PROJECTS CP0767 Mohawk Plastic Wetland Mitigation Monitoring CP1118 AWS Pedestrian Impt. Dogwood St SE to Fir St SE CP1119 AWS Corridor Impt. Fir St SE to Hemlock St SE CP1024 A.W.S. & M St SE Intersection Impt. Print Date: 04/20/2015 File Name: M:\Capital Projects\Active Capital Projects.dwg C512A Well 4 Improvement CP1219 Valley AC Water Replacement CP0765 Lakeland Hills Reservoir Improvements CP1218 AWS - Muckleshoot Plaza to Dogwood St SE C207A A St NW Wetland Mitigation Monitoring C222A S 277th St Corridor & Non-Motorized Improvements C229A BNSF / EVH Ped. Undercrossing CP1304 37th & B St NW Pre - Signal CP1109 2011 Storm Repair & Replacement Phase 2 CP1308 BNSF Utility Crossings CP1308 BNSF Utility Crossings CP1308 BNSF Utility Crossings CP0915 Well 1 - On Site Improvements CP1312 Storm Repair & Replacement CP1316 East Ridge Manor Storm Improvements CP1406 West Main St Signal Upgrades CP1323 2014 Local Street Reconstruction Project CP1402 2014 Citywide Pavement Patch & Overlay Project CP1320 M&O Storm Improvements CP1407 Marchini Meadows CP1411 Muckleshoot Indian Tribe Master Meters CP1409 Oravetz Pl SE Flooding Mitigation CP1416 F St SE Non-Motorized Impovements CP1417 West Hill Springs Improvements CP1415 W Main St Multimodal Corridor and ITS Improvements CP1507 AWN Preservation CP0764 GSA Improvements CP1324 Airport Runway / Apron Rehab CP1412 Auburn Youth and Community Center CP1501 Traffic Signal Safety Improvements CP1502 A St SE & 37th St SE Traffic Signal Improvements CP1414 2015 Local Street Reconstruction CP1506 2015 Pavement Patching & Overlay Project C410A 277th Wetland Mitigation Monitoring