Loading...
HomeMy WebLinkAbout2015 Active Capital Improvement Projects Map Update - 7.16.15.pdfC410A CP0767 CP1107 CP1115 CP1118 CP1202 CP1208 CP1208 CP1208 CP1208CP1208 CP1208 CP1208 CP1208 CP1208 CP1208 CP1208 C512A CP1219 CP 1 2 1 9 CP1219 CP0765 CP1119CP1218 C207A CP1217 C222A C229A CP1304 CP0915 CP1109 CP1308 CP1308 CP1308 CP1308 CP1308CP1308 C524A CP1312 CP1312 CP1316 CP1308 CP1506 CP1406 CP1320 CP0764 CP1312 CP1407 CP 1 3 2 4 CP1411CP1411 CP1417 CP 1 4 1 6 CP1415 CP1415 CP1415 CP1 4 1 5 CP0915 CP 1 5 0 7 CP 1 5 0 7 CP 1 5 0 6 CP1 5 0 6 CP1506 CP 1 5 0 6 CP 1 5 0 6 CP 1 4 1 4 CP1414 CP 1 4 1 4 CP 1 4 1 4 CP1412 CP1502 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 CP1501 CP1122Phase 1A CP1122Phase 1B CP1506 CP1506 CP 1 5 0 6 CP15 0 6 CP 1 5 1 1 CP1506 CP1512 CP1512 CP1512 CP1512CP1406 CP1512 CP1512 CP1512 CP1512 2015 ACTIVE CDPW CAPITAL IMPROVEMENT PROJECTS LEGEND: ConstructionDesign SEWER PROJECTSTRANSPORTATION PROJECTS WATER PROJECTS STORM PROJECTS MISC PROJECTS ConstructionDesignConstructionDesignConstructionDesignConstructionDesign ACTIVE PROJECTS CP1107 Fulmer WellfieldImprovementProject CP1122 30th St NE StormImprovement -Phase 1A CP1208 Sewer Pump StationImprovement ACTIVE PROJECTS CP0767 Mohawk PlasticWetland MitigationMonitoring CP1118 AWS Pedestrian Impt.Dogwood St SE toFir St SE CP1119 AWS Corridor Impt.Fir St SE toHemlock St SE Print Date: 07/15/2015File Name:M:\Capital Projects\Active Capital Projects.dwg C512AWell 4 Improvement CP1219 Valley AC WaterReplacement CP0765 Lakeland HillsReservoir 5Improvements CP1218 AWS - MuckleshootPlaza to Dogwood StSE C207A A St NW WetlandMitigation Monitoring C222A S 277th St Corridor &Non-MotorizedImprovements C229A BNSF / EVH Ped.Undercrossing CP1304 37th & B St NWPre - Signal CP1109 2011 Storm Repair& ReplacementPhase 2 CP1308 BNSF UtilityCrossings CP1308 BNSF UtilityCrossings CP1308 BNSF UtilityCrossings CP0915 Well 1 - On SiteImprovements CP1312 Storm Repair &Replacement CP1316 East Ridge ManorStorm Improvements CP1406 West Main StSignal Upgrades CP1320 M&O StormImprovements CP1407 Marchini Meadows CP1411 Muckleshoot IndianTribe Master Meters CP1416 F St SE Non-MotorizedImpovements CP1417 West Hill SpringsImprovementsCP1415W Main St MultimodalCorridor and ITSImprovements CP1507 AWN Preservation CP1324 Airport Runway /Apron Rehab CP1412 Auburn Youth andCommunity Center CP1501 Traffic Signal SafetyImprovements CP1502 A St SE & 37th St SETraffic SignalImprovements CP1414 2015 Local StreetReconstruction CP1506 2015 PavementPatching & OverlayProject C410A 277th WetlandMitigation Monitoring CP1512 2015 Sewer Repair &Replacement CP1202 Auburn Way So.FloodingImprovements-Phase 2 CP1122 30th St NE StormImprovement -Phase 1B CP1511 M St SE StormReplacement -3rd St SE to East Main