Loading...
HomeMy WebLinkAboutPC-Conditional_UseCITY OF DBURN WASHINGTON Planning, Building, and Community Department Conditional Use Permit General Information The Conditional Use Permit process is to potentially allow uses that are not permitted outright within a zone district. These uses typically require a special degree of control to make sure the uses are consistent with and compatible to other existing and permitted uses within a zone. Requirements: A conditional use permit is required for all land uses listed as conditional uses in the various zoning districts. Procedures: At the time you submit an application, you must have all of the items listed on the attached Conditional Use Permit Submittal Requirements form. Within 28 days of receiving your application, city staff will determine if the application is complete based on the attached checklist. If the application is not complete, then a letter detailing the required information will be sent to you. This type of application requires a public hearing before the Hearing Examiner. Please note that the owner and/or representative must be present at the public hearing. The application will be tabled if the owner or a representative is not in attendance. The Hearing Examiner's written decision is in the form of a recommendation, with the City Council making the final decision. If the council wishes to modify or reject the Hearing Examiner's decision, then a closed record hearing must first be scheduled. Please note that a conditional use permit must be implemented within two (2) years of the approval. If a building permit or occupancy permit has not been issued within the two (2) year period, the conditional use permit shall become null and void. If you have any questions, please contact the Planning Department at 253-931-3090. Page I of 2 AUBURN *MORE THAN YOU IMAGINED CITY OF DBURN WASHINGTON Planning, Building, and Community Department Conditional Use Permit Submittal Requirements The following information shall be included with the Master Land Use Application: ? Master Land Use Application. 10 copies ? All applicable fees (See City of Auburn Fee Schedule). ? 10 copies of a vicinity map. ? 10 copies of a narrative answering the following questions: a. How will the proposed use have no greater adverse impact on the surrounding area than any other use generally permitted in the present zoning classification? b. Why is this Conditional Use Permit compatible with the other existing uses in the neighborhood? c. How will the proposed use be constructed and maintained to be harmonious and appropriate in design, character and appearance with the surrounding vicinity? d. How is the Conditional Use Permit consistent with the Auburn Comprehensive Plan? ? 10 copies of a site plan at a scale not less than 1"=40' and on a sheet no larger than 24"x36" showing the following information: a. Boundaries and dimensions of the property. b. Adjacent public streets. c. Easements, existing and proposed. d. Location and size of all existing and proposed utilities. e. Location of all buildings, including setbacks. f. Location and layout of off-street parking. g. Location and height of fences. h. Location and size of signs. i. Conceptual landscape plan. j. Height of structures. k. Building elevations. Additional information may be required. The applicant will be notified in writing if additional information is necessary. Page 2 of 2 AUBURN *MORE THAN YOU IMAGINED