Loading...
HomeMy WebLinkAboutPC-Final_PlatCITY OF DBURN WASHINGTON Planning, Building, and Community Department Final Plat General Information An application for final plat may be filed by the property owner or the property owner's representative, but ONLY after preliminary plat approval has been granted by the City Council. Please see the preliminary plat application form for specific requirements. Final plat approval is to ensure that the final plat is in conformance with the approved preliminary plat, the required facilities and improvements have been completed, the plat meets the applicable state and local laws in effect at the time of preliminary plat, and that it has received the required certificates and statements of approval. Requirements: All information requested on the final plat submittal requirements form must be submitted by the applicant. Procedures: Once the City Engineer has certified that the improvements have been completed or security in lieu thereof has been provided in accordance with ACC 17.08, a final plat application can be submitted to the City. Within 28 days of receiving a final plat application, city staff will determine whether the application is complete. Please note that an application must be submitted at least 15 working days prior to the next council meeting in order to be included on that meeting's agenda. City Council meets on the 1St and 3`d Monday of the month. Please be aware that additional information may be required. If you have any questions please contact the Planning Department at 253-931-3090. Page 1 of 2 AUBURN *MORE THAN YOU IMAGINED CITY OF DBURN WASHINGTON Planning, Building, and Community Department Final Plat Submittal Requirements The following information shall be included with the Master Land Use Application: ? 10 copies Master Land Use Application ? 10 copies of the final plat prepared in accordance with Auburn City Code Chapter 17.10 of the Land Division Ordinance. ? All applicable fees (See City of Auburn Fee Schedule). ? A current (within 30 days of application) and complete title report. ? A computer check (i.e. lot closure report) of the boundaries, street centerlines, lots, blocks, and lot area. ? Electronic copy (i.e. AutoCad) of the final plat on a CD-ROM. ? A copy of the approved preliminary plat. ? A copy of any covenants applicable to the subdivision. ? A complete survey of the section (or sections) in which the plat is located accompanied by field and computation notes and a sketch showing all distances, angles, and calculations required to determine corners and distances of the plat. ? Street, sanitary sewer, and water plans/profiles pursuant to Auburn City Code Chapter 17.12 of the Land Division Ordinance. ? A Certificate of Improvements signed by the City Engineer. Please contact the City Engineer at 253-931-3010 to obtain that form. ? The final plat shall be prepared by a professional land surveyor licensed by the State of Washington. The preparer shall, by placing his or her signature and stamp upon the face of the plat, certify that the plat is a true and correct representation of the land actually surveyed by the preparer, that the existing monuments shown thereon exist as located and that all dimensional and geodetic details are correct. ? The final plat shall be drawn with India ink on mylar measuring 18" x 22" in size, allowing one-half (1/2) inch for border. The final plat shall be accurate, legible, and drawn to an engineering (decimal) scale of one hundred (100) feet of fewer to the inch. If more than one sheet is required, an index sheet showing the entire subdivision with street and highway names and block numbers (if any) shall be provided. Each sheet, including the index sheet, shall be of the above-specified size. All signatures or certifications appearing on the final plat shall be in reproducible black ink. ? The final plat shall show the addresses for the lots which will be provided by the City of Auburn. Page 2 of 2 AUBURN *MOPE THAN YOU IMAGINED