HomeMy WebLinkAboutUtility Connection Fees _1-09_
PERMIT CENTER
HANDOUT ON UTILITY
CONNECTION FEES
Informational Brochure
January 2009
Prepared by
Development Section
Engineering Division
Public Works Department
25 West Main St.
Auburn, WA 98001-4998
(253) 931-3010
FAX (253) 931-3053
The City of Auburn Fee Schedule authorizes Utility Connection Fees. The intent of this
handout is to provide an informative summary of selected sections of the Fee
Schedule. This document is intended to aid in understanding Utility Connection Fees,
and is not intended to replace or supersede any portion of the Fee Schedule or the
Auburn City Code. Also included in this handout are the monthly rates as of January 1,
2009. These rates are for reference only and are subject to change.
What are Utility Connection Fees?
• Utility Connection Fees are fees on development used to pay for its
proportionate share of the capital costs and installation of the City’s utility
infrastructure. The City of Auburn collects Utility Connection fees for the Water,
Sanitary Sewer, and Storm Drainage Utilities. The following three pages of this
handout contain the fee schedules for the different utility connection fees.
• Utility Connection Fees are charged for new construction and/or when upgrading
an existing service.
When Are Utility Connection Fees paid?
• The City usually collects Utility Connection Fees at the time a building permit is
issued. If a change in the service does not require a building permit, Utility
Connection Fees will then be collected at the issuance of the associated permit.
In cases where a facility extension is included in the building process, the permit
will not be issued until after the new extension has been accepted.
What do Utility Connection Fees consist of?
Utility Connection fees may consist of several different fees.
Permit Fee
• The includes administrative costs and inspection time and the cost
of material (in the case of a water meter for example).
System Development Charge
• The is a charge imposed on new customers, or
existing customers revising the use of their property, in recognition of the
previous investment of the City and it’s customers in the utility system.
Utility Payback Fee
• A is an assessment recorded against the property. This fee
was established to reimburse developers that installed utility infrastructure that
benefits other parcels. Parcel(s) that benefit from said utilities must pay their
pro-rata share prior to connection to the utility.
Charge in Lieu of Assessment
• The is another type of fee, which is charged to
property not previously assessed for utility lines abutting their property.
Page 1 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
• Property located outside the city limits installing utility lines may also be charged
County Right-of-Way Permit Fee
a . This fee is for a permit to dig within the
county right-of-way and will be obtained by the City.
Page 2 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
STORM SEWER CONNECTION CHARGES
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
System Development
Type Permit Fee
Charge (SDC)
Single Family Parcel $26.00 Per Parcel* $1,162.00 Per Parcel
Other Parcels $207.00 $1,162.00 Per E.S.U.**
:
Sample 1Single Family Residence Parcel
Permit Fee $ 26
SDC $1,162
Total*** $1,188
:
Sample 2Commercial\Industrial Parcel
Total of 55,000 sf parcel (30,000 sf Building and 20,000 sf Parking Lot, and 5,000 sf
landscaping)
Permit Fee $ 207.00
SDC $22,345.26***
Total**** $22,552.26
Notes:
* Based on one single-family residence or one duplex per parcel. More than one
unit per parcel will be charged at the Other Parcel rate.
** E.S.U. – Equivalent Service Unit - A configuration of development of impervious
surfaces estimated to contribute an amount of runoff to the City’s storm drainage
system which is approximately equal to that created by the average single family
residential parcel. One E.S.U. is equal to 2,600 square feet of impervious
surface or any portion thereof.
*** When calculating the total SDC a credit will be applied for the existing
impervious area.
**** Check to see if any charges in lieu of assessment or payback charges are
applicable.
Page 3 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
ALL CONNECTION FEES AND SYSTEM DEVELOPMENT CHARGES ARE SUBJECT TO
CHANGE.
Page 4 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
SANITARY SEWER CONNECTION CHARGES
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Permit Fee
System Development
Type
Existing Sewer New Service
Charge (SDC)
Stub Line Required
Single Family Parcel $88.00 $155.00 $850.00 Per Parcel
Other Parcels $88.00 $155.00 $850.00 Per RCE*
Sample 1: (This is strictly an example and not the set fee for this type of connection)
Single-family residential, side sewer stub present:
Permit Fee $ 88
SDC $ 850
Total** $ 938
Sample 2: Commercial building with one side sewer connection and 1.5 RCE’s* worth
of plumbing fixtures:
Permit Fee $ 88
SDC $ 1,275
Total** $ 1,363
Notes:
* Residential Customer Equivalent, Calculated using Metro Non-Residential
Sewer Use Certificate.
** Check to see if any Assessment Charges are Applicable.
ALL CONNECTION FEES AND SYSTEM DEVELOPMENT CHARGES ARE
SUBJECT TO CHANGE.
King County Capacity Charge:
Sanitary sewer connections made after January 1, 2006, will be required to pay a King
County Capital Improvements fee. The residential fee is $34.05 per month for 15 years
and is billed every six months by King County. Non-residential fees are determined by
use. First payment is due six months after the date of connection. No capacity charge
is required for repairs or replacement of existing sewer connections.
Page 5 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
King County
Questions should be addressed to : (206) 684-1740
Page 6 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
WATER SERVICE CONNECTION CHARGES
Water Service Installation Permit Fee
System
Meter Size Development
Water Service & Meter Box
Existing Water
Charge
(In Inches)
Installed by City**
Service &
(SDC)
Meter Box*
Paved Street Unpaved Street
¾” or less $212.00 $2,175.00 $1,170.00 $2,424.00
1” $280.00 $2,380.00 $1,475.00 $4,048.00
1-½” $450.00 $3,210.00 $2,305.00 $8,072.00
2” $560.00 $3,488.00 $2,588.00 $12,920.00
3” (Actual Cost) (Actual Cost) (Actual Cost) $24,240.00
4” (Actual Cost) (Actual Cost) (Actual Cost) $40,408.00
6” (Actual Cost) (Actual Cost) (Actual Cost) $80,792.00
8” (Actual Cost) (Actual Cost) (Actual Cost) $129,280.00
10” (Actual Cost) (Actual Cost) (Actual Cost) $135,971.00
* Installation of a water meter done by the City and the service either already
exists or has been installed by the developer.
** Installation of the entire water service is done by the City.
Sample 1: Single-family residence 3/4” meter water service and meter box required:
Permit Fee $ 2,175.00
SDC $ 2,424.00
*
Total $ 4,599.00
Sample 2: Commercial warehouse with a 1-½” domestic meter and a 1” irrigation
meter. Water Services and meter boxes installed by the contractor.
1-½” Domestic Permit $ 450.00
1” Irrigation Permit $ 280.00
SDC (for domestic) $ 8,072.00
SDC (for irrigation) $ 4,048.00
Fireline Connection Permit $ 335.00
Total* $ 13,187.00
Notes:
*Check to see if any charges in lieu of assessment or payback charges are applicable.
Page 7 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
ALL CONNECTION FEES AND SYSTEM DEVELOPMENT CHARGES ARE
SUBJECT TO CHANGE.
Page 8 of 5
REF. H\DEVELOPMENT\Handouts\Utility Connection Fees (1-09)
MONTHLY RATES
STORM
Base Rate ESU Rate
Customer Classes
per Month per Month
Single Family Residential $13.38 N/A
Non-Single Family (NSF) $8.32 $10.65/ESU
NSF w/Detention $8.32 $8.55/ESU
NSF w/Retention $8.32 $5.30/ESU
NSF w/Water Quality Treatment $8.32 $6.40/ESU
NSF w/Detention and Water Quality Treatment $8.32 $4.83/ESU
NSF w/Retention and Water Quality Treatment $8.32 $3.03/ESU
The monthly charge for non-single family parcels shall be based upon the following formula:
+x=
BASE RATE (TNESU ESU RATE) Monthly Storm Charge
=
TNESU Total number of equivalent service units contained on the parcel
All rates effective as of January 1, 2008.
SANITARY SEWER
Customer Classes Monthly Rate
Single Family Residential Inside City Limits $11.02
Single Family Residential Outside City Limits $16.53
Non-Single Family Inside City Limits
Rate for first 750 cubic feet of water used $11.02
Rate for each additional 100 cubic feet $1.11
Non-Single Family Outside City Limits
Rate for first 750 cubic feet of water used $16.53
Rate for each additional 100 cubic feet $1.66
All rates effective as of January 1, 2008.
WATER
Base Rate Quantity Charge per
Customer Classes
per Month 100 cubic feet (ccf)
$1.80 0 – 7 ccf
$2.21 7.01 – 15 ccf
Single Family Residential $9.08
>
$2.50 15 ccf
Multi-Family Residential $27.06 $1.89
Commercial $27.06 $2.15
Manufacturing/Industrial $27.06 $1.75
Schools $27.06 $2.04
City Accounts $27.06 $2.50
Irrigation Only $9.08 $2.50i
All rates effective as of January 1, 2008. For Customers outside the City limits, all charges
will be increased by 50%.