HomeMy WebLinkAbout5791ORDINANCE NO. 5 7 9 1
AN ORDINANCE of the City Council of the City of Auburn,
Washington, providing for amendment to the City of Auburn
Fee Schedule, and repealing Sections 13.20.050 and
13.48.410 of the Auburn City Code, and amending Chapter
13.40 of the Auburn City Code, relating to City fees and
charges for Facility Extensions
WHEREAS, in connection with the municipal functions and operations of the City
of Auburn, the City provides various public services, a number of which entail fees; and,
WHEREAS, the City Council provided for adoption of a City of Auburn Fee
Schedules in the adoption of Ordinance No. 5707; and,
WHEREAS, in the course of reviewing City fees, and in keeping with the
philosophy of setting City fees in amounts reflective of actual costs, and in further
keeping with the intent to make City fees and charges consistently accessible, it is
appropriate to revise and amend the fees and charges for Facility Extensions, and to
further consolidate City fees and charges.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON DO ORDAIN, as follows:
SECTION ONE. AMENDMENT TO CITY OF AUBURN FEE SCHEDULE.
The Fee Schedule of the City of Auburn is amended to include and provide for
the fees and charges for Planning & Land Use applications and activities, and for other
areas of municipal activity of the City, and the City of Auburn Fee Schedule is updated
with the inclusion of the fees as set forth on the document attached hereto, marked as
Exhibit "A" and incorporated herein by this reference.
SECTION TWO. REPEAL OF SECTION IN CITY CODE.
That Section 13.20.050 of the Auburn City Code, regarding Developer Extension
Agreements, is repealed.
13.20.050 Developer extension agreement - Required - Manual adopted.
There is adopted by reference the "Developer's Public Facility Extension
Manual for Sanitary Sewers, Water, Storm Sewers and Streets," a copy of
Ordinance No. 5791
September 16, 2003
Page 1
which is attached to the ordinance codified in this chapter and
denominated Exhibit "A." (Ord. 5212 § 1 (Exh. I), 1999; Ord. 4241 § 2,
1987.)
SECTION THREE. REPEAL OF SECTION IN CITY CODE.
That Section 13.48.410 of the Auburn City Code, regarding the Developer Public
Facility Extension Manual, is repealed.
13.48.410 Developer's public facility extension manual adopted.
There is adopted by reference, upon the effective date of the ordinance
codified in this chapter, and upon filing with the city clerk one copy thereof,
the "Developer's Public Facility Extension Manual for Storm Sewers,
Sanitary Sewers, Water, and Streets," and any amendments henceforth.
(Ord. 5212 § I (Exh. J), 1999; Ord. 4492 § 4, 1991.)
SECTION FOUR. AMENDMENT TO CHAPTER OF CITY CODE.
That ChaPter 13.40 of the Auburn City Code, regarding Facility Extensions, is
amended to read as follows:
Chapter 13.40
UTILITY FACILITY EXTENSIONS
Sections:
13.40.010
13.40.015
13.4O.02O
13.40.030
13.40.040
13.40.050
13.40.060
~ ~+;~;+,, I~rilih~ extension defined.
Payback agreement defined.
I It;l;~,, ' '
...... ~ Facd~ty extension agreement - Issuance authority -
Application form.
Design plans requirements.
Fees,
Payback agreement.
13.40.010 Utility-Facility extension defined.
As used in this chapter, "utility-facility extension" means the extension of a
sanitary sewer, water or storm line belonging to the city, a city street or alley,--a
~, or that determined by the city engineer to be of public use. (Ord. 3375 ~
2, 1979.)
13.40.015 Payback agreement defined. As used in this chapter:
A. "Payback agreement" shall be defined as an agreement between the city and
a developer for the sole purpose of reimbursing such developer for a pro rata portion of
the original costs incurred by that developer for the installation of public utility systems
to the extent such facilities benefit future connections. (Ord. 4759 § 1, 1995.)
Ordinance No. 5791
September 16, 2003
Page 2
13.40.020 ~-ility-Facility extension agreement - Issuance authority - Application form.
The city engineer..,..~,."~'"" .h~vo "~'..,,.~,~... ..... ..,~;,....,~,,.~,;"'" is delegated and authorized to
develop, implement, execute and administer ut-ilit~facility extension agreements within
franchised utility areas and to all persons including corporations, firms, companies,
individuals, government agencies or officials or any organization of any kind upon the
application for ant-he ~agreement to extend a ut~y-facility and shall prOvide
an application form for the utility-facility extension agreement to be filled out by each
applicant. (Ord. 3375 § 3(A), 1979.)
13.40.030 Design plans requirements.
~,., ,r ..,.,.. ,-.: 2,4 ~..,.~ ~.,, '~ ~,.,.h o;-.~, ,.,..,,.. Plans
.............. , ....... , eng:noor, covering the design of the ut41it-y-facility extension shall
be submitted for approval by the o_City upon application for the ut41it-y-facilit¥ extension
conformance with the city of Auburn ~4esign anO construction ~standards. (Ord. 5~44 ~
~, ~ ~8; Ord. 3375 ~ 3(B), ~ ~7~.)
13.40.050 Fees.
....... y~ .......... ~ ......... ~ .................... , ....... ,~nmn~r~..~.___.. fees__.--
The
fnr
public facility extensions shall be included amonq the Facility Extension Fees as
oh~ll ~+,
established in ~he CiW of Auburn Fee Schedule ....... b~~.~,'~ .~,~ ..... ~.~+~ ~,~"'~ ;~;~,,...~
benefits and cv~rh~ad costs. All fees shall be paid to the city engineer prior to final city
acceptance of the work. (Ord. 3375 ~ 4, 1979.)
13.40.060 Payback agreement.
A. The public works director is authorized and directed to execute payback
agreements for public utilities as defined in ACC 13.40.015 at the request of the
developer upon city council approval. The agreement shall be executed in conformance
Ordinance No. 5791
September 16, 2003
Page 3
~,r,~,~,o,, ~-ilit,, extension requirements of this chapter.
B. The payback reimbursement charge to other properties shall be based on the
total project cost, figured on a front foot or area assessment basis, or other equitable
method, as determined by the city, or any combination of these methods at the
reasonable discretion of the public works director. The project costs may include all
applicable design and construction charges of the project submitted by the developer
and approved by the city.
C. All properties connecting to a public utility system for which a payback
agreement is in force and which property has not been assessed the connection fee as
provided in the payback agreement or has not borne an equitable share of the costs of
such public system shall be subject to a payback connection charge. The connection
charge shall be based on a pro rata share of the costs as stated in the payback
agreement, at the reasonable discretion of the public works director and approved by
the city council. Payment of the payback charge shall be made in full to the city prior to
connecting to the public utility system. (Ord. 4759 § 1, 1995.)
SECTION FIVE. GENERAL SEVERABILITY.
That if any provision of this Ordinance or the application thereof to any person or
circumstance is held to be invalid, the remainder of such code, ordinance or regulation
or the application thereof to other person or circumstances shall not be affected.
SECTION SIX. IMPLEMENTATION.
The Mayor is hereby authorized to implement such administrative procedures as
may be necessary to carry out the directives of this legislation.
SECTION SEVEN. EFFECTIVE DATE.
That this Ordinance shall be in full force and effect five (5) days after publication
of the Ordinance Summary.
OCT 0 6 2003
INTRODUCED:
PASSED: OCT 0 $ 2003
APP~
PETER B. LEWIS, MAYOR
ATTEST:
'Danielle E. Daskam, City Clerk
Ordinance No. 5791
September 16, 2003
Page 4
APPROVEEf~S TO FORM:
(...,~e"rl~. ~lq~d, Cit~/~ttorn~.
PUBLISHED: //~ '/,~ "~
Ordinance No. 5791
September 16, 2003
Page 5
EXHIBIT "A"
CITY OF AUBURN FEE SCHEDULE
FEES FOR CITY PERMITS AND ACTIONS
Planning & Land Use Fees, Application Fees
Applications for any action identified below shall not be accepted for filing until the fees
per the below schedule have been paid to the City.
Type
Shoreline substantial development
Street and alley vacations
Short subdivisions
Rezoning
Conditional use permits
Mining permits
Preliminary plats
Final plats
Hearing Examiner variances
Hearing Examiner cases (non-variance)
temporary uses, special exceptions,
administrative appeals, off-site
parking lots
Planned Unit Developments
Lot line adjustments
Administrative use permits
Special home occupation permits
Environmental checklists
Impact statements
Fee
$1,000.00
$250.00
$1,000.00
$1,500.00
$750.00
$1,000.00
$3,000.00
$1,000.00
$1,000.00
$200.00
$500.00
residential
commercial
and $50.00 per lot
and $30.00 per lot
residential
other (non-residential)
$200.00
$2,000.00 and $50.00 per acre
$200.00 single family
$500.00 other
$400.00
$1oo.oo
$700.00
For actions requiring an impact
statement plus actual cost for
preparation of review of draft and
final impact statements, including lab
or, materials, mailing, and other
actual costs related to the drafting
and circulating of the impact
statement.
Fee for Posting Public Notices
(per Ch. 1.27 ACC)
Type of
Mounting Board
Type I
Type II
Type III
Fee
Per Board
$20.00
$30.00
$50.00
Replacement
Cost, Per Boa~
$50.00
$75.00
$100.00
Ordinance No. 5791
September 16, 2003
Page 6
Sign Permits (per Ch. 18.56 ACC)
Unless exempt by Ch. 18.56 ACC, the fee shall accompany each application for a sign
permit. The amount of the fee shall be based upon the value of the sign pursuant to
Table l-A, Ch. 1, 1997, Uniform Building Code.
Additional Sign Fees
Appeals and variance applications
Temporary sign permits (issued by hearing examiner)
$200.00
$100.00
Comprehensive Plan Text Amendments*
Comprehensive Plan Map Amendments*
$500.00
$1,500.00
*Fees for amendments to text or maps of the Comprehensive Plan apply only where an
applicant seeks an amendment affecting specific properties, rather than the City generally or
property within the City generally.
Auburn Municipal Airport Lease Fees
Type
Open hangar (buildings 3, 4, 5, 6, 7)
Open twin hangar (building 8)
Closed hangar (building 2)
Closed hangar (buildings 9, 10)
Tiedown
Storage units (buildings 2, 3, 4, 5, 6, 7, 8)
Storage units (185 sq. ft. - buildings 9, 10)
Storage units (380 sq. ft. - buildings 9, 10)
Storage units (430 sq. ft. - buildings 9, 10)
Fees
$159.51
$208.30
$224.98
$354.12
$57.36
$65.46
$86.57
$129.86
$151.5o
A surcharge of $3.00 per month is charged in addition to the base monthly rental fees
provided in this section for all tiedown, hangar and storage rental fees to be used for the
provision of increased security at the Auburn Municipal Airport (approved by Ordinance
No. 5500 on January 16, 2001).
The above leases are subject to applicable leasehold taxes, which shall be paid by the
tenant. The total charge is reflected in monthly billing rates. Tenants shall be given
notice as required by Ordinance or lease agreements. The Airport Lease rates shall be
effective January 1, 2003.
Automatic gate electronic cards.
One automatic gate electronic card will be issued to each tenant free of charge.
Any additional electronic cards requested by a tenant are subject to a $25.00
refundable deposit charge. A $25.00 replacement fee will be assessed against
the tenant for all lost or damaged electronic cards. All electronic cards must be
returned to the airport at the time of lease expiration.
O~inance No. 5791
September16,2003
Page 7
Building Permit Fees
Building Permit fees under the Uniform Building Code (UBC), or other building permit
fees that use total valuation as the determinant of the fee amount, shall be based upon
the following table:
BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to $500.00 $27.00
$501.00 to $2,000.00
$2,001.00 to $25,000.00
$79.00for the first $2,000.00 plus $16.00
additional $1,000.00, or fraction thereof, to and
$25,000.00
$27.00 for the first $500.00 plus $4.00 for each additional
$100.00, or fraction thereof, to and including $2,000.00
for each
including
$25,001.00to $50,000.00 $447.00 for the first $25,000.00 plus $12.00 for each
additional $1,000.00, or fraction thereof, to and including
$50,000.O0
$50,001.00to$100,000.00 $734.00 for the first $50,000.00 plus $8.00 for each
additional $1,000.00, or fraction thereof, to and including
$100,000.00
$100,001.00 to $500,000.00 $1,133.00 for the first $100,000.00 plus $7.00 for each
additional $1,000.00, or fraction thereof, to and including
$500,000.00
$500,001.00 to $1,000,000.00 $3,687.00 for the first $500,000.00 plus $6.00 for each
additional $1,000.00, or fraction thereof, to and including
$1,000,000.00
$1,000,001.00 and up $6,394.00 for the first $1,000,000.00 plus $4.00 for each
additional $1,000.00, or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hour ...................................................................... $54.00 per person 1
(minimum charge-two hours)
2. Reinspection fees assessed under provisions of Section 305.8 ............................................ $54.00 per person 1
3. Inspections for which no fee is specifically indicated ......................................................... $54.00 per person 1
(minimum charge-one-half hour)
4. Additional plan review required by changes, additions or revisions to plans ...................... $54.00 per person 1
(minimum charge-one-half hour)
5. For use of outside consultants for plan checking and inspections, or both ................................. Actual costs 2
1 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
overhead, equipment, hourly wages and fringe benefits of the employees involved.
2 Actual costs include administrative and overhead costs.
Building Code Appeals (ACC 15.08.020)
$500.00
Police Department Fees
Type
Police Report/Collision Report
(fee not charged where requested
by victim or party involved)
Fees
$10.00
Ordinance No. 5791
September16,2003
Page 8
Fingerprinting Fees
(fee not charged where taking of
fingerprints is required by the city)
Health Services
(to be collected from persons confined in the
Auburn City Jail who request health services)
$6.00
$5.00
City Clerk Fees
TvDe
Fees for public records - Collection.
Noncertified copies of public records
(where no special search or documentation is required)
Certified copies of public records
Noncertified copies of public records
(where a search or documentation is required)
Fees for Auburn City Code book and supplements.
Copy of Auburn City Code book
(with latest supplement)
Supplements to the Auburn City Code book
Fees
$0.15
$3.00
$3.00
and $0.50
$98.50
$9.50
per page
per page
forlStpage
each add'l page
percode book
per copy.
F. City Cemetery Fees
Type
Property
Graves - Standard
Sections 1 - 5
Memory Meadow
Sections 6 and 7
Section 9
Section 9 Double Depth
(includes 2 Lawn Crypts)
Section 9, Upright Section
Children's Place
Section 9 - Upright Section Urn
Plots (up to 4 urns)
Centennial Urn Garden
Centennial Urn Garden Companion
Columbarium Wall Single
Columbarium Wall Double
Centennial Columbarium Wall
Single
Double
Companion
Phase II - Centennial Columbarium Wall
1. Top Row
Ordinance No. 5791
September 16, 2003
Page 9
Fees
$ 695.00
1,090.00
1,090.00
1,385.00
2,765.00
2,645.00
265.00
2,645.00
420.00
840.00
650.00
925.00
780.00
1,185.00
1,565.00
1,655.00
2. Middle Row
3. Middle Row
4. Bottom Row
Phase II - Centennial Columbarium Companion
1. Top Row
2. Middle Row
3. Middle Row
4. Bottom Row
Mausoleum NiChes - Single
Mausoleum Niches - Double
Extended Land Use
Memorial Plaque
Opening and Closing
Vault/Liner
Children's Place
Cremation Plot
Niche
Entombment
Set up charge
Marker Services
Setting Flat Marker
Setting Upright Monument
Resetting Fee - Flat
Resetting Fee - Upright
Recording Fee
Overtime Per Person,
Per Half Hour
Saturday Service Fee
Full Burial
Cremation
Flower Vases
Standard Stainless Steel
Deluxe Cast Zinc
Deluxe Niche Vase
Liners
Mountain View Vault
Concrete Liner
Double Depth Liner
Infant
Urn Encasement
Vaults (Other than Mtn. View Vault)
Markers
Urns
Basic
Deluxe Urns
Millennium Mausoleums - Crypts
(Proposed Completion 2000)
Each crypt - Top
Each crypt - Bottom
1.4 x cost
1.67 x cost
1.67 x cost
1,520.00
1,520.00
1,385.00
3,310.00
3,045.00
3,045.00
2,775.00
445.00
680.00
135.00
265.00
795.00
210.00
270.00
255.00
550.00
145.00
180.00
345.00
115.00
290.00
25.00
28.00
340.00
180.00
45.00
90.00
90.00
340.OO
340.00
680.00
195.00
160.00
20.00
10,000.00
9,000.00
Ordinance No. 5791
September 16, 2003
Page 10
Millennium Mausoleums Building Niches
Outside Niches
Inside Niches
Discounts
Marker setting by private parties.
(Setting must meet the cemetery
specifications - border size, cleanup,
work signed off by cemetery coordinator.)
1,950.00
3,900.00
$10.00
Fire Department Fees
Type
Fire Code Appeals (ACC 15.36.020)
Permit Fees (per UFC § 105)**
Initial permit
Annual renewal
Inspection Fees (per UFC § 103, Ch 15.38 ACC)**
Initial inspection
1st re-inspection
2nd re-inspection
Any subsequent (after 2nd) re-inspection
After Hours Fee
(for fire inspections or permit work
required to occur outside of normal
business hours)
** For permits and inspections not covered by the
Uniform Building Code or building code fee
schedule/table.
Fees
$500.00
60.00
60.00
No Charge
No Charge
45.00
100.00
53.58 per hour (2 hour min.)
H. Public Works Department Fees
Transportation Impact Fee Rate Schedule
Unit of Basic Impact
Land Use
Residential
SF residential
MF residential
Mobile home in MH park
Retirement community
Hotel
Motel
Measure
dwelling
dwelling
dwelling
dwelling
room
room
Commercial - Services
Drive-in bank
lane
O~inance No. 5791
September16,2003
Page 11
Trip Rate
1.01
0.62
0.49
0.27
0.61
0.47
63.33
Fee Rate
$677.71
$440.91
$261.35
$144.01
$468.78
$361.19
$10,895.93
Walk-in bank
Day care center
Library
Post office
Service station
Service station w/minimart
Auto care center
Movie theater
Health club
Commercial - Institutional
Elementary school
Middle school/jr, high
High school
Church
Hospital
Commercial - Restaurant
Restaurant
High turnover restaurant
Fast food restaurant
Commercial - Retail Shopping
Shopping center
Up to 9,999 sq. ft.
10,000 to 49,999 sq. ft.
50,000 to 99,999 sq. ft.
100,000 to 199,999 sq. ft.
200,000 to 299,999 sq. ft.
300,000 to 399,999 sq. ft.
Over 400,000 sq. ft.
Supermarket
Convenience market
Freestanding discount store
Hardware/paint store
Specialty retail center
Furniture store
Car sales - New
Car sales - Used
Commercial- Office
Up to 49,999 sq. ft.
50,000 to 99,999 sq. ft.
100,000 to 199,999 sq. ft.
200,000 to 299,999 sq. ft.
Over 300,000 sq. ft.
Medical office
O~inance No. 5791
September16,2003
Page 12
sffGFA
sffGFA
sffGFA
sffGFA
VFP2
sffGFA
sffGLA
sffGFA
sffGFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GLA
sf/GLA
sf/GLA
sf/GLA
sf/GLA
sf/GLA
sf/GLA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
sf/GFA
space3
sffGFA
sffGFA
sffGFA
sffGFA
sffGFA
sffGFA
33.15
13.20
7.09
10.79
14.56
96.37
3.38
3.80
4.30
1.20
1.20
1.02
0.66
0.92
7.49
10.86
33.48
13.70
9.46
6.92
5.47
4.60
4.10
3.77
11.51
53.73
4.24
4.42
2.59
0.45
2.80
0.28
3.76
2.18
1.65
1.44
1.35
3.66
$7.61
$2.501
$1.74
$2.65
$1,903.84
$9.45
$0.99
$1.43
$1.91
$0.69
$0.69
$0.66
$0.47
$0.71
$3.89
$3.84
$6.43
$1.69
$1.49
$1.09
$1.08
$O.98
$1.15
$1.30
$3.47
$5.97
$0.97
$0.58
$0.43
$0.09
$1.98
$197.84
$2.24
$1.92
$1.45
$1.27
$1.19
$2.52
Industrial
Light industry/manufacturing
Heavy industry
Industrial park
Mini-warehouse/storage
sf/GFA 0.98 $0.96
sf/GFA 0.68 $0.67
sf/GFA 0.92 $0.90
sf/GFA 0.26 $0.26
Notes:
A. Basic trip rates are based on the ITE Trip Generation Manual, 6th Edition.
B. Impact fee rate calculation is based upon the following methodology:
- Basic Trip Rate = PM Peak Hour Trip Generation (per unit of measure)
- Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x Per Trip Fee/(divide by)
1,000 for rate per square foot (where applicable) = Impact Fee Rate (per unit of measure)
C. For land uses not specifically identified here, trip generation rates could be derived from ITE or a
special study by the applicant. The City fee for review of any special study shall be a non-reimbursible
fee of $250.00 per study submittal payable prior to City review of any independent fee study.
D. Per trip fee is $573.50.
E. sf = square foot = sq. ft.
Footnotes:
1 Impact fee rate was $3.80/sf. For the economic welfare of the citizens of Auburn, rate has been
reduced to $2.50/sf. 2 VFP = vehicle fueling position.
3 Space is individual vehicle sales space: 70 vehicles for sale = 70 vehicle spaces.
Facility Extension Fees
Facility Extension Fees are the summation of the following categories (a+b+c+d):
a. For the combined linear footage of water, sewer and storm drainage facilities:
The
The
Any
first 0 lineal feet (LF) to 1000 LF is charged at $5.00 per LF plus,
next 1001 LF to 2500 LF is charged at $2.50 per LF plus,
additional over 2500 LF is charged at $1.50 per LF.
b. For the linear footage of street facilities:
The first 0 LF to 500 LF will be charged at $6.25 per LF plus,
The next 501 LF to 1000 LF will be charged at $3.75 per LF plus,
Any additional over 1000 LF will be charged at $1.00 per LF.
For non-linear extensions such as pump stations or traffic signals, the extension fee
will be determined by the City Engineer based on an estimate of the City's labor Cost
associated with the plan review, inspection, and administration of the application
d. For facilities located in existing King County Right-of-Way (ROW), an additional
extension fee will be charges as follows:
$400.00 plus $4.50 per LF of the combined water and sewer facilities extension located
within the existing King County ROW.
Ordinance No. 5791
September 16, 2003
Page 13
Facility Extension Fees will be paid as follows:
1. Forty percent (40%) at the time of execution of the facility extension a,qreement
2. Sixty percent (60%) upon the City's approval of the construction drawings and prior
to the start of construction.
Ordinance No. 5791
September 16, 2003
Page 14