HomeMy WebLinkAbout5891 Exhibit A P/T #4P/T#4 Update to City of Auburn Six - Year Capital Facilities Plan for years 2005-2010. PROJECT CHANGES BETWEEN PRELIMINARY VERSION AND FINAL VERSION OF CFP TYPE OFFAC,ILITY=.:v ar. Final r imine .' .- ha0 e; r: Airport 590,000 590,000 _ _ Cemetery 505,000 505,000 Community Center 3,400,000 3,400,000 Community Improvement 4,149,500 3,750,000 399,500 A Fire Projection 250,000 250,000 General Municipal Buildings 2.0,620,000 20,630,487 (10,487) B Golf Course 3,290,000 3,290,000 Parks and Recreation 5,570,000 5,570,000 - Sewer 16,017,000 16,017,000 Storm Drainage 5,287,000 Transportation 91,433,500 5,287,000 82,633,500 8,800,000 C Water 14,033,000 12,733,000 1,300,000 D TOTAL 165,145,000 154,655,987 10,489,013 Explanation for Changes: A Justice Center Parking 350,000 300,000 50,000 Traffic Safe�Improvements67,500 ----- ----------- - 67,500 Terminal Park Non -Motorized 207,000 207,000 School Zone Flashing Beacons _ 75,000 Total - 699,500 - 75,000 300,000 399,500 B City Hall Plaza Restoration 170,000 180,487 (10,487) Total 170,000 180,487 (10,487 C Local Street Improvement Program 8,800,000 8,800,000 Total 8,800,000 D 1 300,000 East Valley Highway Pipeline 1,300,000 NOTE: This updated CFP information sheet (which was presented at the City Council's Dec. 6, 2004 public hearing) will to be integrated into the final published CFP document. mm- rte�e"'�! PRELIMINARY CAPITAL FACILITIES PLAN (2005 - 2010) City of Auburn 25 West Main Auburn, WA 98001 (253)931-3000 www.ci.auburn.wa.us City of Auburn Capital Facilities Plan CITY OF "WAS H INGTON � �J City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 TABLE OF CONTENTS ExecutiveSummary ........................................................................................................ 1 1. Introduction Purpose........................................................................................................................ 7 Statutory Requirement for Capital Facilities Elements ................................................. 7 Concurrency and Level of Service............................................................................... 8 Implementation............................................................................................................. 9 2. Goals and Policies 1. Capital Facilities Response to Growth.....................................................................11 2. Financial Feasibility ................................................................................................11 3. Public Health and Environment...............................................................................13 4. Consistency With Regional Planning......................................................................14 Introduction..................................................................................................................15 Airport..........................................................................................................................16 Cemetery..................................................................................................................... 27 CommunityCenter.......................................................................................................32 CommunityImprovement.............................................................................................36 FireProtection..............................................................................................................43 General Municipal Buildings.........................................................................................47 GolfCourse.................................................................................................................. 54 Library.......................................................................................................................... 60 Parks and Recreations.................................................................................................62 Police........................................................................................................................... 80 SeniorCenter...............................................................................................................82 SanitarySewer.............................................................................................................84 SolidWaste..................................................................................................................90 StormDrainage............................................................................................................91 Transportation........:...................................................................................................107 Water.........................................................................................................................169 City of Auburn Capital Facilities Plan �J CITY OF L� 1] 0 0 City of Aubum Capital Facilities Plan EXECUTIVE SUMMARY A capital facilities element is one of the comprehensive plan elements required by Washington's Growth Management Act (GMA). Capital facilities generally have long useful lives, significant costs and tend not to be mobile. The GMA requires that capital facilities elements include an inventory of existing capital facilities (showing locations and capacities), a forecast of future needs for such capital facilities, proposed locations and capacities of new or expanded capital facilities and at least a six-year plan to finance capital facilities with identified sources of funding. The GMA also requires that the land use element be reassessed if probable funding falls short of existing needs. This document is the City's six-year Capital Facilities Plan (CFP). The CFP, in conjunction with other City adopted documents, satisfies the GMA requirement for a Capital Facilities Element. It addresses one of the GMA's basic tenets, that is, the provision of adequate facilities to support development in accordance with locally adopted level of service standards. This CFP will enable the City to: (1) Make informed decisions about its investment of public dollars, and (2) Make timely decisions about maintaining levels of service in accordance with this CFP and other adopted plans. CAPITAL FACILITIES PLAN CONTENT This CFP consists of the following: Chapter 1. Introduction Chapter 2. Goals and Policies Chapter 3. Capital Improvements Purpose of CFP, statutory requirements, methodology. Goals and Policies related to the provision of capital facilities. Proposed capital projects, which include the financing plan and reconciliation of project capacity to level of service (LOS) standards This CFP is a companion document to the Capital Facilities Element of the Auburn Comprehensive Plan (Chapter 5). The Capital Facilities Element of the Auburn Comprehensive Plan identifies the City's planning approach and policy framework for the provision of capital facilities. This CFP provides the background inventory, identifies proposed projects and establishes the six-year capital facilities plan for financing capital facilities. City of Auburn Capital Facilities Plan GROWTH ASSUMPTIONS In planning for capital facilities, consideration of future growth needs to be considered. The CFP is based on the following City population forecast: Year Cit Wide 2004 46,336 2005 48,996 2010 68,696 The population forecasts are based on information from the State of Washington Office of Financial Management (OFM) as well as estimates developed by the City of Auburn Planning and Community Development Department. CAPITAL COSTS OF FACILITIES Based on the analysis of capital improvements contained in this document, the cost of City -owned and managed capital improvements for 2005-2010 is summarized as follows: TYPE OF FACILITY 2005-2010 Airport 590,000 Cemetery 505,000 Community Center 3,400,000 Community Improvement 3,750,000 Fire Projection 250,000 General Municipal Buildings 20,630,487 Golf Course 3,290,000 Parks and Recreation 5,570,000 Sewer 16,017,000 Storm Drainage 5,287,000 Transportation 82,633,500 Water 12,733,000 TOTAL 154,655,987 2 i 0 City of Aubum Capital Facilities Plan FINANCING FOR CAPITAL FACILITIES The financing plan for the City-wide capital improvements includes: REVENUE SOURCE 2005-2010 CAPITAL FACILITY Grants 206,500 Airport 2,270,000 Parks 52,189,400 Trans ortation User Fees 383,500 Airport 505,000 Cemetery 165,000 Golf Course 7,967,000 Sanitary Sewer 5,287,000 Storm Drainage 11,633,000 Water Arterial Street Fund 5,488,600 Transportation G.O. Bonds 3,200,000 Community Center 3,125,000 Golf Course 9,250,000 General Municipal Buildings General Funds 200,000 Community Center 3,750,000 Community Improvements 250,000 Fire 5,680,487 General Municipal Buildings 1,565,000 Parks Public Works Trust Fund 2,450,000 Sanitary Sewer 1,100,000 Water Muckleshoot Indian Tribe 5,600,000 Sanitary Sewer Mitigation/Impact Fees 700,000 General Municipal Buildings 1,444,800 Transportation REET 1,350,000 Parks 5,000,000 General Municipal Buildings 3,123,100 Transportation Developer/Private Contributions 385,000 Parks 1,300,000 Transportation Other 19,087,600 Transportation Total 154,655,987 City of Auburn Capital Facilities Plan SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS The forecasted impacts of new capital facilities on the City's future operating budgets (2006-2011) are as follows: Capital Projects 2008 -. - .2007 ` =' 2008-- 2009 2010 2011 Total 1 Airport 1,000 1,000 1,000 1,000 1,000 1,000 6,000 2 Cemetery - - - - - 3 Community Center - - 4 Community - - Improvememt 5 Fire Protection - - 6 General Municipal - - Buildings 7 Golf Course 8 Library 9 Parks and Recreation - 25,000 25,000 25,000 25,000 25,000 125,000 10 Police - - - - _ 11 Senior Center - 12 Sanitary Sewer - - - - _ _ . 13 Storm Drainage 2,000 2,000 4,000 4,000 4,000 4,000 20,000 14 Transportation 27,546 47,685 48,424 74,098 93,346 114,208 405,307 15 Water 8,000 8,000 18,000 18,000 18,000 19,200 89,200 4 0 K] • 0 0 City of Auburn Capital Facilities Plan LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP Based on the proposed six-year capital projects and the projected population increase of 22,360 (48%), the LOS for the following City -owned public facilities will change as follows: The LOS for the following facilities will be increased as a result of the CFP. FACILITY I LOS UNITS 2004 LOS CFP LOS lCommunity Center I S Ft per 1,000 Pop. 0.00 509.00 The LOS for the following facilities will be maintained as a result of the CFP. FACILITY LOS UNITS 2004 LOS CFP LOS Roads Volume/Capacity Ratio "D" "D" Airport % Air Operations Support 100% 100% Sanitary Sewer Residential GPCDP (Note 1) 158.00 158.00 Storm Drainage Not Applicable 0.77 Community Parks Water Residential GPCDP (Note 1) 236.00 236.00 Note 1: GPCPP = Gallons Per Customer Per Day Acres per 1,000 Pop. The LOS for the following facilities will be reduced as a result of the CFP. FACILITY LOS UNITS 2004 LOS CFP LOS Cemetery Burial Plots per 1,000 Pop. 55.00 45.00 General Municipal Buildings Sq Ft per 1,000 Pop. 3,871.00 2,611.00 Neighborhood Parks Acres per 1,000 Pop. 1.15 0.77 Community Parks Acres per 1,000 Pop. 4.92 3.44 Linear Parks Acres per 1,000 Pop. 0.69 0.46 Open Space Acres per 1,000 Pop. 4.29 2.90 Special Use Areas Acres per 1,000 Pop. 1.17 0.79 Golf Course Holes per 1,000 Pop. 0.39 0.26 Fire Projection Apparatus per 1,000 Pop. 0.22 0.15 Library Sq Ft per 1,000 Pop. 324.00 218.00 City Jail Beds per 1,000 Po . 1.20 0.80 Senior Center S Ft per 1,000 Po 272.00 183.00 5 City of Auburn. Capital Facilities Plan CFP ELEMENT SOURCE DOCUMENTS Documents used in preparing this Capital Facilities Plan (CFP) are principally the master plans for the various public facilities included in this CFP. These individual master plans provide detailed identification of projects and identify their (projects) proposed funding sources. City documents include: • City-wide Comprehensive Land Use Plan (2003); • City Municipal Airport Master Plan Update (2001-2020); • City Comprehensive Water Plan (2001); • City Comprehensive Transportation Plan (1997) and Six Year Transportation Improvement Program (2004-2009); • City Comprehensive Drainage Plan (2002); • City Comprehensive Sewer Plan (2001); • City 2004 Budget and 2003 Annual Financial Report; and, • Master plan update for parks, as well as numerous other planning and financial documents. All documents are available for public inspection at the City of Auburn. 0 0 City of Auburn Capital Facilities Plan CHAPTER 1 INTRODUCTION The Capital Facilities Plan (CFP) is a 6 -year plan (2005-2010) for capital improvements that support the City of Auburn's current and future growth. In this plan, funding for general government projects are identified. To maintain consistency with individual master and utility comprehensive plans, applicable projects in the 6 -year window of those master/utility plans are included in this CFP. The CFP also identifies LOS standards, where applicable, for each public facility. STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS RCW 36.70A.070(3)(d) requires that the comprehensive plan capital facilities element include "a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes." RCW 36.70A.070(3)(e) requires that all capital facilities have "probable funding" to pay for capital facility needs, or else the City must "reassess the land use element." In addition, the capital facilities element must include the location and capacity of existing facilities, a forecast of future needs, and their proposed locations and capacities. The State Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation facilities, police and fire protection facilities. The GMA also seeks the selection of level of service standards for capital facilities. As a result, public facilities in the CFP should be based on quantifiable, objective measures of capacity such as traffic volume, capacity per mile of road and acres of park per capita. In some instances, though, level of service may best be expressed in terms of qualitative statements of satisfaction with a particular public facility. Factors that influence local level of service standards include, but are not limited to, community goals, national and local standards, and federal and state mandates. To be effective, the CFP must be updated on a regular basis. State GMA guidelines suggest that the CFP be updated at least every two years. The City will seek to update the CFP annually in order to incorporate the capital facilities improvements in the City's annual budget process. VA City of Auburn Capital Facilities Plan CONCURRENCY AND LEVEL OF SERVICE Concurrency The GMA requires that jurisdictions have certain capital facilities in place or available within a specified time frame when development occurs. This concept is called concurrency. Under the GMA, concurrency is required for transportation facilities, and is recommended by the State for certain other public facilities, namely potable water and sanitary sewer. Concurrency has a direct relationship to levels of service. The importance of concurrency to capital facilities planning is that development may denied if it reduces the level of service for a capital facility below the locally adopted minimum. Explanation of Levels of Service As indicated earlier, the GMA requires level of service be established for certain transportation facilities for the purposes of applying concurrency to development proposals. The State GMA guidelines recommend the adoption of levels of service standards for other capital facilities to measure the provision of adequate public facilities. Typically, measures of levels of service are expressed as ratios of facility capacity to demand (i.e., actual or potential users). Table 1-1 lists generic examples of levels of service measures for some capital facilities: TABLE 1-1 Sample Level of Service Measurements Type of Capital Facility Sample Level of Service Measure General Municipal Buildings Square feet per 1,000 population Parks Acres per 1,000 population Roads and Streets Ratio of actual volume to design capacity SewerAVater Gallons Der customer Der day The need for capital facilities is largely determined by a community's adopted LOS standards and whether or not the community has formally designated capital facilities, other than transportation, as necessary for development to meet the concurrency test. The CFP itself is therefore largely influenced by the selection of the level of service standards. Levels of service standards are measures of the quality of life of the City. The standards should be based on the City's vision of its future and its values. 0 T City of Auburn Capital Facilities Plan IMPLEMENTATION Implementation of the CFP requires constant monitoring and evaluation. The CFP is sensitive to funding and revenue availability and therefore needs to be constantly monitored against variations in available resources. To facilitate its implementation, the CFP should be kept current. Update of Capital Facilities Plan Perhaps the most desirable way to keep the CFP current is to update it regularly so the six-year plan is a rolling CFP. Again, the State recommends that the CFP be updated at least biennially. The City of Auburn will seek to update the CFP annually in conjunction with the budget process. Future updates will consider: A. Revision of population projections, including annexations; B. Update of inventory of public facilities; C. Update of costs of public facilities; D. Update of public facilities requirements analysis (actual levels of service compared to adopted standards); E. Update of revenue forecasts; F. Revise and develop capital improvement projects for the next six fiscal years; and, G. Update analysis of financial capacity. Amendments to the CFP, including amendments to levels of service standards, capital projects, and/or the financing plan sources of revenue are all actions that can keep the CFP current and relevant to City decision-making. 0 City of Aubum Capital Facilities Plan CITY OF 0 0 10 City of Auburn Capital Facilities Plan CHAPTER 2 GOALS AND POLICIES This chapter identifies goals and policies specific to the City's provision of capital facilities. Goal 1 Provide a variety of responses to the demands of growth on public facilities. Policy 1.1 Establish land use patterns that optimize the use of public facilities. Policy 1.2 Provide additional public facility capacity when existing facilities are used to. their maximum level of efficiency (consistent with adopted standards for levels of service). Policy 1.3 Encourage development where new public facilities can be provided in an efficient manner. Policy 1.4 Exempt the following from the concurrency management program: 1.4.1 Development vested by RCW 19.26.095, 58.17.033 or 58.17.170. 1.4.2 Development that creates no added impact on public facilities. 1.4.3 Expansions of existing development that were disclosed and tested for concurrency as part of the original application. Goal 2 Provide needed public facilities that are within the ability of the City to fund or within the City's authority to require others to provide. Policy 2.1 Establish level of service standards that are achievable with the financing plan of this Capital Facilities Plan. Policy 2.2 Base the financing plan for public facilities on realistic estimates of current local revenues and external revenues that are reasonably anticipated to be received by the City. Policy 2.3 Match revenue sources to capital projects on the basis of sound fiscal policies. 2.3.1 The City shall continue to fund utility costs through utility enterprise funds, based on user fees and grants. Public facilities that are utilities are sewer, solid waste, storm drainage, and water. 2.3.2 Where feasible pursue joint venture facility construction, construction timing, and other facility coordination measures City of Aubum Capital Facilities Plan for City provided facilities, as well as with school districts and other potential partners in developing public facilities. 2.3.3 The City shall continue to assist through direct participation, LIDs and payback agreements, where appropriate and financially feasible. Where funding is available, the City may participate in developer initiated facility extensions or improvements, but only to the extent that the improvements benefit the broader public interest, and are consistent with the policies of this Capital Facilities Plan. Policy 2.4 If the projected funding is inadequate to finance needed public facilities and utilities based on adopted level of service standards and forecasted growth, the City will do one or more of the following to achieve a balance between available revenue and needed public facilities: 2.4.1 lower the level of service standard; 2.4.2 increase the amount of revenue from existing sources; 2.4.3 adopt new sources of revenue; 2.4.4 require developers to provide such facilities at their own expense; and/or 2.4.5 amend the Land Use Element to reduce the need for additional public facilities. Policy 2.5 Both existing and future development will pay for the costs of needed capital improvements. 2.5.1 Ensure that existing development pays for capital improvements that reduce or eliminate existing deficiencies, and pays for some or all of the cost to replace obsolete or worn out facilities. Existing development may also pay a portion of the cost of capital improvements needed by future . development. Existing development's payments may take the form of user fees, charges for services, special assessments and taxes. 2.5.2 Ensure that future development pays a proportionate share of the cost of new facilities which it requires. Future development may also pay a portion of the cost to replace obsolete or worn-out facilities. Future development's payments may take the form of voluntary contributions for the benefit of any public facility, impact fees, mitigation payments, capacity fees, dedications of land, provision of public facilities, and future payments of users fees, charges for services, special assessments and taxes. 11 12 City of Aubum Capital Facilities Plan Policy 2.6 The City will determine the priority of public facility capital improvements using the following criteria as general guidelines. Any revenue source that cannot be used for the highest priority will be used beginning with the highest priority for which the revenue can legally be expended. 2.6.1 Projects that eliminate hazardous conditions. 2.6.2 Refurbishment of existing facilities that contribute to achieving or maintaining standards for adopted levels of service. 2.6.3 New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. 2.6.4 New or expanded facilities that provide the adopted levels of service for new development and redevelopment during the next six fiscal years. 2.6.5 Capital improvements that significantly reduce the operating cost of providing a service or facility, or otherwise mitigate impacts of public facilities on future operating budgets. 2.6.6 Capital improvements that contribute to stabilizing and developing the economy of the City. 2.6.7 Project priorities may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility are financially feasible prior to constructing the facility. Goal 3 Protect public health, environmental quality, and neighborhood stability and viability through the appropriate design and installation of public facilities. Policy 3.1 Promote conservation of energy, water and other natural resources in the location and design of public facilities. Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever combined sewers may be discovered. Policy 3.3 Practice efficient and environmentally responsible maintenance and operating procedures. Policy 3.4 The siting, design, construction and improvement of all public buildings shall be done in full compliance with the Americans with Disabilities Act (ADA). Policy 3.5 Promote economic and community stability and growth through strategic investments in public facilities and public private/partnerships. 13 City of Auburn Capital Facilities Plan Goal 4 Make the Capital Facilities Plan consistent with other elements of the comprehensive plan, and - to the extent feasible - with other city, county, regional and state adopted plans. Policy 4.1 Ensure that the growth and development assumptions used in the Capital Facilities Plan are consistent with similar assumptions in other elements of the comprehensive plan. Policy 4.2 Coordinate with non -city providers of public facilities on a joint program for maintaining applicable levels of service standards, concurrency requirements, funding and construction of public facilities. 1] 0 14 City of Auburn Capital Facilities Plan 0 CHAPTER CAPITAL IMPROVEMENTS 1. INTRODUCTION This CFP includes City capital improvement projects, and the financing plan to pay for those projects. It also contains the inventory of existing City facilities, and identifies a level of service standard, where applicable. Each type of City public facility is presented in a separate subsection that follows a standard format. Throughout this section, tables of data are identified with abbreviations that correspond to the type of facility: For example, Table W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds to the name of the type of facility. 1. Narrative Summary This is an overview of the data, with sections devoted to Current Facilities, Level of . Service, Capital Facilities Projects and Financing, and Impact on Future Operating Budgets. 2. Inventory of Facilities (Table X-1) 0 This is a list of existing capital facilities, including the name, capacity (for reference to levels of service), and location. This table also includes any proposed capital projects and the planned inventory total as of December 31, 2010. 3. Capital Projects and Financing Plan (Table X-2) This is a list of capital improvements that identifies existing deficiencies, identifies facilities needed for future growth, and identifies the repairing or replacing of obsolete or worn out facilities through December 31, 2010. Each list shows the proposed financing plan followed by individual worksheets showing the project detail. 4. Impact on Future Operating Budgets (Table X-3) This is a list of new capital projects and the forecasted impacts on the City's future operating budgets (2006 — 2011). 15 City of Auburn. Capital Facilities Plan AIRPORT Current Facilities The City of Auburn operates the Auburn Municipal Airport, providing hangar and tie - down facilities/leasing space for aircraft -related businesses. As of 2002, there were approximately 141,000 take -offs and landings (aircraft operations) at the airport annually. Table A-1 "Facilities Inventory" lists the facilities with current capacity and location. Level of Service (LOS) The Auburn Municipal Airport Mater Plan Update 2001 — 2020 provides a maximum runway capacity (LOS standard) of 231,000 aircraft operations annually; one take- off or landing equals one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA). The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways, holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100% of aircraft operations during any one year. By 2020 the Airport Master Plan forecasts the number of operations to be 193,189 — well below the capacity of the airport runway. Capital Facilities Projects and Financing The City's Airport facilities include seven non -capacity capital projects at a cost of $590,000. These projects are for facilities repairs and improvements. Table A-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table A-3 shows, operating budget impacts of $6,000 are forecasted for Airport facilities during the six years 2006 — 2011. 16 0 0 9 0 City of Auburn Capital Facilities Plan TABLE A -1 Facilities Inventory Airport 17 CAPACITY CAPACITY FACILITY # of Aircraft # of Feet LOCATION Existing Inventory Hangars 145 400 23rd Street NE Tiedowns 214 400 23rd Street NE Air Strip 3,400 400 23rd Street NE Total Existing Inventory 359 3,400 Proposed Capacity Projects None 0 0 Total Proposed Capacity Projects 0 0 2010 Projected Inventory Total 359 3,400 17 TABLE A - 2 City ofAubum Capital Facilities Plan CAPITAL FACILITIES PLAN PROJECTS AND FINANCING AIRPORT 2007 Non -Capacity Projects: 40,000 160,000 1. Airport Office` .a=.. ....,. 50,000 _ 260,000 Cost 160,000 120,000 - 40,000 Revenue- Airport Fund 590,000 120,000 2 Airport Security - 40,000 r- 50,000 Cost 40,000 40,000 40,000 40,000 40,000 50,000 - Revenue- Airport Fund 40,000 . 40,000 40,000 40,000 40,000 50,000 3. Airport Segmented Circle 40,000 160,000 40,000 Cost 10,000 - - - - - Revenue- Airport Fund 1,000 - - - - - Grants 9,000 - - - - - 4. Relocate Rotating Beacon Cost 10,000 - - - - _ Revenue- Airport Fund 1,000 Grants 9,000 5. Obstruction Removal Cost 10,000 Revenue- Airport Fund 1,000 Grants 9,000 6. REIL Lights & Key MIC System Cost 20,000 Revenue- Airport Fund 2,000 Grants 18,000 7. Striping & Sealcoating bid for taxiway & aircraft parking lot Cost 170,000 Revenue- Airport Fund 8,500 Grants 161,500 COSTS: Capacity Projects Non -Capacity Projects Total Costs REVENUES: Revenue- Airport Fund Grants Total Revenues SUMMARY: COSTS AND REVENUES 120,000 120,000 250,000 250,000 10,000 1,000 9,000 10,000 1,000 9,000 10,000 1,000 9,000 20,000 2,000 18,000 170,000 8,500 161,500 260,000 40,000 160,000 40,000 40,000 50,000 590,000 260,000 40,000 160,000 40,000 40,000 50,000 590,000 53,500 40,000 160,000 40,000 40,000 50,000 383,500 206,500 - - - - 206,500 260,000 40,000 160,000 40,000 40,000 50,000 590,000 18 0 C� City of Auburn Capital Facilities Plan .CAPITAL.FAC/L-ITIES PLAN -2005-2010_-,_-1 Project Title: Airport Office Project No: Project Type: Project Manager: Description: -, Design and construct a replacement Airport office to house Seration. ac counting and transientivisitors at the Airport. Progress Summary: 6 month process from design to completion. Impact on Operating Budget Once Completed: $1,000 per year in upkeep and improvements Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Airport Revenue - - Grants - - - Bond Proceeds - Impact Fees Total Funding Sources: Expenditures: Design - - - - Right of Way - Construction Total Ear endiiure: Forecasted Project Cost: 2008 2007 2008 2009 2010 Total Funding Sources: 2005-2010 Unrestricted Airport Revenue 120,000 - - - .120,000 Grants Bond Proceeds - - impact Few Total Funding Sources: 120,000 120,000 Expenditures: Design Right of Way - - x::120.000 Construction 120,000 2k ... .. Total 120,000 120,M 19 City of Auburn Capital Facilities Plan CAMAUFACILMES PLAN . Project Title: Airport Security Project No: Project Type: Project Manager: Description:, Increased security identified as one of the.highest priority needi°for the airport in the 2005 Development Plan. y _ Progrgess Summary: Impact on Operating Budget Once -Completed:—- Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Tota! Funding Sources: Unrestricted Airport Revenue - 40,000 40,000 Grants - Bond Proceeds Impact Fees Total Funding Sources: - - an nnn Right of Way Forecasted Project Cost: 2006 2007 2006 2009 2010 - ... Total-- _ Fonding Sources: - 2005 2010 Unrestricted Anport - Revenue 40,000 40,000 40,000 40,000 50,000 210,000 Grana - Bond Proceeds _ _ hnpaet Fees Design - Right of Way - _ construction 40,000 40,000 40,000 40,000 50,000 210,000 20 City of Aubum Capital Facilities Plan is E Description: - Repair or replace segn Aed circle that has'badly detencs The segmented circle is designed to draw visual CAPITALfACILlT1E5`PLAN without operating control toners. . ;= _�,3005=2010 Project Title: Airport Segmented Circle Project No: - Project Type: YrD Actual Budget Project Manager: Budget Expenditures Balance is E Description: - Repair or replace segn Aed circle that has'badly detencs The segmented circle is designed to draw visual attention to the Airport wind indicator located witthin the circond to provide visual traffic pattem information at airports without operating control toners. . Progress Summary: Impact on Operating Budget Once Completed: - Current Year Budget: 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Airport Revenue - 1,000 1,000 Grants - - 9,000 9,000 Bond Proceeds - - - - Impact Fees Total Funding Sources: 10,000 10,000 Expenditures: Design - - - - Right ofWay - - - - Construction 10,000 10,000 Total Expenditure: 101000 10,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding sources: 2005-2010 unrestricted Airport Revenue - - - - - 1.000 - Grants - - - - - 9.000 Bond Proceeds impact Feu Total Funding Sources: 10,000 ExpendlWiss: Design Right of Way - _ _ _ _ - Construction 10,000 Total diture: 10 21 City of Aubum Capital Facilities Plan CAPLTAL FACILITIES PLAN =A 2005-2010 Project Title: Relocate Rotating Beacon Project No: Project Type: Project Manager: Description: 6dsting rotating beaco located on property adjacent to rt Beacon -needs to be relocated _ - Progress Summary: Impact on Operating Budget Once Completed: Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoel Proiect Total Funding Sources: Unrestricted Airport Revenue - 1,000 1,000 Grants - - 9,000 9,000 Bond Proceeds - - - _ !m act Fees Total Funding sources: 10,000 10,000 Expenditures: Design - - - - Right olWay - - _ - Construction 10,000 10.000 Total Expenditure: 10,000 10,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding sources: 2005.2010 Unrestricted Ahport - Revenue - - - - - 1,000 Grana - - - - - 9,000 Bond Proceeds Impact Fees Total Funding sources: 10,000 Expenditures: Design Right o1 Way Conafruegon- 10.000 Toal re: 10.000 22 • C� is City of Auburn Capital Facilities Plan +�CAPITAL: FAC/UTIES PLAN 2005=2010 Project Title: Obstruction Removal Project No: Project Type: Project Manager: 0 0 Description: > ,. Clearing of trees and bn>stt on and adjacent tothe Airport s identified by an Aviation inspection. Some of the obstructions identified ar&not onAirport property. Progress Summary: Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity. 2000 YE 2005 Year End Prior to 2000 Estimate 2005 Budoet Proiecl Total Funding Sources: Unrestricted Airport Revenue - 1,000 1,000 Grants - - 9,000 9,000 Bond Proceeds - - _ - Impact Fees Total Funding Sources: 10,000 10,000 Expenditures; Design - - - - Right orWay - - - Construction 10,000 10,000 Total Expenditure: 10,000 10,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tom Funding sources: 2005-2010 Unrestricted Airport Revenue _ 1,000 Grants - - - .9,000 Bond Proceeds - Impact Fees Total Funding Sources: 10.000 Expenditures: Design - Right ofWay Construction 10.000 Tota!burr. 10 000 23 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN Project Title: REIL Lights and Key MIC System Project No: Project Type: Project Manager. Description: ` iring that only allows lights to be operated at 50% Rewire Runway End Idelper Lights (REIL) due -to deten41nd power output Install KeyWMiC System that allows approadeparting aircraft at night to tum runway lights on for a set amount -of time. Currently, runway lights are on usk till dawn with only 5-6 aircraft movements a night on average " Progress Summary: Impact on Operating Budget Once -Completed Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance ' Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding Sources: Unrestricted Airport Revenue - 2,000 2,000 Grants - 18,000 18,000 Bond Proceeds _ _ _ Impact Fees Total Funding Sources: 20,000 20,000 Expenditures: Design - - _ - Right of Way - _ _ _ Construction 20,000 20,000 - Total Expenditure: 20,000 20,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tom Funding Sources: - 2005-.2010 Unrestricted Airport , Revenue 2.000 Gents - - Bond Proceeds _ _ -. -^18,000 Im Fees Total Fundin sources: 2D.000 - Umpendltures: Dgaign Right of Way conshueBon - .. ZO 000 Total dMure: 20,000 24 0 0 City of Auburn Capital Facilities Plan . CAPITAL FACILITIES PLAN z> =2005--ZoltF �' T Project Title: Striping & Sealcoating Project No: Project Type: Project Manager. 0 Description: Striping and sealcoatingzbid for Taxiway and aircraft parking'lot. The asphalt has deteriorated to the critical stage of cracking at areas other than seams. Asphalt is alligatoring ure of asphaB bonding). Progress Summary: Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding Sources: Unrestricted Airport Revenue - 8,500 8,500 Grants - - 161,500 161,500 Bond Proceeds - - - - Impact Fees Total Funding Sources: 170,000 170,000 Expenditures: Design - - - _ Right of Way - - - - Construction 170.000 170,000 Total Expenditure: 170,000 170,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tow Funding Sources: 2005-2010 Unrestricted airport Revenue - _ _ _ - 8,500 Grants - - - - - 161,500 Bond Proceeds Impact Fees Total Funding Sources. - 170,000 Expenditures: Design Right of Way Construction - - 170.000 Total Expenditure. 170,0001 25 TABLE A — 3 City of Auburn Capital Facilities Plan IMPACT ON FUTURE OPERATING BUDGETS AIRPORT CITY OF AUBURN Capital Projects 2006 2007 2008 2009 2010 2011 Total � K 1 Airport Office 1,000 1,000 1,000 1,000 1,000 1,000 6,000 2 Airport Security - - - - - - - 3 Airport Segmented - - - - - - Circle 4 Relocate Rotating - - - - - - _ Beacon 5 Obstruction Removal - - - - - - 6 REIL Lights & Key MIC - - - - - - _ System 7 Striping & Sealcoating - - - - - - _ Total 1,000 1,000 1,000 1,000 1,000 1,000 6,0001 0 26 City of Aubum Capital Facilities Plan 0 CEMETERY 0 Current Facilities The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (50 acres and four buildings) that provides burial services and related merchandise for the community. The Pioneer Cemetery is a historic cemetery which is no longer used for burial purposes. Table C-1 "Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 55 burial plots/niches per 1,000 population is based on the existing inventory divided by the 2004 Citywide population of 46,336. The proposed LOS of 45 burial plots/niches per 1,000 population is based on the projected inventory divided by the 2010 projected Citywide population of 68,696. In addition the cemetery will be able to offer a natural cremation garden. Capital Facilities Projects and Financing The City's Mountain View Cemetery facilities include two capital projects at a cost of $505,000, which includes (1) a chapel/niche mausoleum, and (2) a natural cremation garden. Table C-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for the cemetery during the six years 2006 — 2011. 27 TABLE C-1 City of Auburn Capital Facilities Plan 9 Facilities Inventory Cemetery 0 28 CAPACITY FACILITY # of burial lots/niches LOCATION Existing Inventory Mountain View Cemetery 2,560 2020 Mountain View Drive Pioneer Cemetery 0 8th & Auburn Way North Total Existing Inventory 2,560 Proposed Capacity Projects Natural Cremation Garden 50 Chapel/Niche Mausoleum 500 Total Proposed Capacity Projects 550 2010 Projected InventoryTotal 3,110 0 28 9 City of Auburn Capital Facilities Plan TABLE C - 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING -, ... CEMETERY Capacity Projects 1 Natural Cremation Garden Cost 20,000 20,000 Rev - Cemetery Fund 2 0,0 00 20,000 2 Chapel/Niche Mausoleum - Cost 25,000 460,000 485,000 Rev - Cemetery Fund 25,000 460,000 485,000 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects 45,000 460,000 505,000 Total Costs 45,000 460,000 505,000 REVENUES: Rev - Cemetery Fund 45,000 460,000 505,000 Total Revenues 45,000 460,000 505,000 BALANCE 29 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN - 2005 -2010. Project Title: Natural Cremation Garden Project No: Project Type: Project Manager: Arnie Galli Description: Design and develop scattenngarden and natural cremation me" l area. V L Progress Summary: Included in 2004 Master Plan Impact on Operating Budget Once Complete& Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget 20,000 20,000 Budget Amendments Adjusted Budget 20,000 20.000 Activity: 2000 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Year End Working Capital 20,000 20,000 Grants Bond Proceeds Impact Fees Total Funding Sources: 20,000 20,000 Expenditures: Design - - - _ Right of Way _ - - Construction 20,000 20,000 Total Expenditure: 20,000 20,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tom/ Fund/my sources: 2005-2010 Year End Woddng Capital. _ _ _ _ 20,000 Grams - Bond Proceeds _ Impact Fees Total Funding Sources: 20,000 Expendhures: Design Right of Way Consfrgegon - - 20,000 Total Ex /fore: 20 000 30 E 0 i is City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 Project Title: Chapel/Niche Mausoleum Project No: Project Type: Project Manager. • Arnie Galli/Dan Scamporlina Description:,_ Create conceptual doondrawings fora ohapeliniche mauu m T,. Progress Summary: With council approval, this wid be included it 2004wiaster plan update. Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget 25,000 25,000 BudgetAmendments Adjusted Budget 25,000 25,000 Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: - WorkingCapibl - 25,000 25,000 Grants - _ Bond Proceeds - - - impact Fees Total Funding Sources: 25,D00 25,000 Expenditures: Design - - 25,000 25,000 Right of Way - - - - Construction Total Expenditure: 25,000 25,000 Forecasted Project Cost: 2008 2007 2008 2009 2010 Total Funding sources: 2005-2010 Working Caphal 400,000 - - 488.000 Greets _ Bond Proceeds Impact Fees Total Funding sources: 460,000 488,000 Expenditures: Design - _ _ _ 28,000 Right of Way _ _ _ _ _ - Consrruction 460,000 460 000 Total cera: 4W.000 486 000 31 City of Aubum Capital Facilities Plan COMMUNITY CENTER Current Facilities The City of Auburn currently does not have a community center. Level of Service (LOS) The City does not have a current LOS for a community center. The proposed LOS of 509 square feet per 1,000 population is based on the projected inventory divided by the 2010 projected Citywide population of 68,696. Capital Facilities Projects and Financing The proposed Community Center facility construction project will cost approximately $3,400,000. Table CC -2 shows the proposed financing plan. Impact on Future Operating Budgets Based on outcome of feasibility study, increased costs to the general fund may be seen. 32 0 E 0 0 TABLE CC -1 i • City of Aubum Capital Facilities Plan Facilities Inventory Community Center 33 CAPACITY FACILITY (Square Feet) LOCATION Existing Inventory None 0 Total Existing Inventory 0 Proposed Capacity Projects New Community Center35,000 Total Proposed Capacity Projects 35,000 2010 Projected Inventory Total 35,000 33 City of Aubum Capital Facilities Plan TABLE CC -2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COMMUNITY CENTER _ —, _. 1. Convert and Expand Form�r-YMCA Building m a Community Building (+ 35,000 sq ft) Cost 100,0()0 100,000 3,200,000 - - - 3,400.000 Rev- General Funds 100,000 100,000 - - - - 200,000 Rev - G.O. Bonds - - 3,200,000 - - - 3,200,000 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects 100,000 100,000 3,200,000 - - - 3,400,000 Total Cost 100,000 100,000 3,200,000 - - - 3,400,000 REVENUES: Rev- General Funds 100,000 100,000 - - - - 200,000 Rev - G.O. Bonds - - 3,200,000 - - - 3,200,000 Total Revenues 100,000 100,000 3,200,000 - - - 3,400,000 BALANCE - - _ 11 0 34 0 E City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN ..2005.2010 Project Title: Auburn Community Center Project No: Project Type: Project Manager: Daryl Faber Description_ Construction and/or renovation of the eldsdng YMCA bi ding located at Les Gove Park. = Progress Summary: Community committee is being formed to work with consultant on preferred outcomes. Impact on Operating Budget Once Completed. Based on the outcome of Feasibility Study increased cost to the general fund may be seen. - Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - - Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End Prior to 2000 Estimate 2005 Budoet Project TOtaf Funding Sources: General Fund - 100,000 100,000 Grants - - Bond Proceeds - - - - User Fees Total Funding Sources: 100,000 100,000 Expenditures: - Design - - 100,000 100,000 Right or Way - - - - Construction Total Expenditure: 100,000 100,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 General Fund 100,000 - - - _ 200,000 Grants- - - _ Bond Proceeds 3,200,000 - - - 3,200,000 User Fees Total Funding Sources: 100,000 3,200,000 3,000,000 Expenditures: Design 100,000 200,000 - - 400,000 Right or Way - - - Co --:3.000,000 - 3.000,000 Total Ex dMure: 100 000 3,200,000 3 000 35 City ofAuburn•Capital Facilities Plan COMMUNITY IMPROVEMENT Current Facilities In 2002, the City entered into a 99 -year lease with the Central Puget Sound Regional Transit Authority (Sound Transit) for the use of 180 parking stalls and the right to sublease the Commercial Tenant area of the transit center parking garage and retail area. Level of Service (LOS) No Levels of Service for community improvement projects have been identified at this time. Capital Facilities Projects and Financing The City's proposed Community Improvement facilities include five capital projects at a cost of $3,750,000. Table CI -2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for community improvement projects annually during the six years 2006 — 2011. 36 E 0 0 City of Aubum Capital Facilities Plan TABLE CI - 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING "r-COMMUNIT!'IMPROVEMENTS Non -Capacity Projects: 1. Downtown Public -{Private Redevelopment ' Cost 500,000 500,000 500,000 500,000 500,000 500,000 Rev - General Fund 500,000 500,000 500,000 500,000 500,000 500,000 2. GatewayProgram Cost 85,000 15,000 85,000 15,000 85,000 15,000 Rev - General Fund 85,000 15,000 85,000 15,000 85,000 15,000 3. Parking lot Improvement Cost 50,000 Rev - General Fund 50,000 4. Neighborhood Revitalization Cost 100,000 Rev - General Fund 100,000 5. Justice Center Parking Cost Rev - General Fund COSTS: Capacity Projects Non -Capacity Projects Total Costs REVENUES: Rev - General Fund Total Revenues 3,000,000 3,000,000 300,000 300,000 50,000 50,000 100,000 100,000 300,000 300,000 300,000 300,000 SUMMARY: COSTS AND REVENUES 1,035,000 515,000 585,000 515,000 585,000 515,000 1,035,000 515,000 585,000 515,000 585,000 515,000 3,750,000 3,750,000 1,035,000 515,000 585,000 515,000 585,000 515,000 3,750,000 1,035,000 515,000 585,000 515,000 585,000 515,000 3,750,000 37 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 Project Title: Downtown Public/Private Redevelopment Project Na Project Type: Project Manager. Description: - -41 Ongoing Program to purchaseproperty, construct new buildings;'and renovate existing buildings. Progress Summary: Impact on Operating Budget Once Completed. This project will have no impact on the operating budget. Current Year Budget. 2005 YTDActual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Project Total Funding Sources: General Fund Revenue - _ 500,000 500,000 Grants - - _ Bond Proceeds - - Impact Fees Total Funding Sources: - 500,000 500,000 Expenditures: Design - - - - RightofWay - - - - Construction 500,000 500,000 Total Expenditure: 500,000 500,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding sources: 2005.2010 General Fund Revenue 500,000 500,000 500.000 500,000 500,000 3,000,000 Grants - Bond Proceeds Impact Fees Total Funding Sources: 500,000 500,000 500,000 500,000 500,000 3,000,000 Expenditures: Design - - - - - - Right ofWay - - - _ - Construcoon 500,000 500,000 500,000 500,000 500,000 3,000,000 Total Ex dlture: 500,000 500,000 500,000 500,000 500,W0 3,000 000 38 0 0 0 City of Auburn Capital Facilities Plan Project Title: Project No: Project Type: Project Manager: CAPITAL FACILITIES PLAN -4005-2010 Gateway Program C221A Paul Krauss Description -"s,- -`Ongoing Ongoing program to market the City andlo design tale construction of gateways throughout the City. Progress Summary: impact on Operating Budget Once Completed: This project will have no impact on the operating budget: Current Year Budget: 2005 YTD Actual Budget Budget Expenditunss Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: ' General Fund Revenue 89,471 30,000 85,000 204,471 Grants - - - _ Bond Proceeds Impact Fees Total Funding Sources: 89,471 30,000 85,000 204,471 Ex endifuRs: Design 89,471 - - 89,471 Right of Way - _ _ _ Construction .30,000 85,000 115,000 Total Expenditure: 89,471 30,000 85,000 204,471 Forecasted Project Cost: 2008 2007 2008 2009 2010 Total Funding Sources: 2005-2010 General Fund Revenue 15,000 85,000 15,000 85,000 15,000 .. 300,000 Grana - - - _ _ Bond Proceeds impact Fees -al TR Funding Sources: 15,000 85,000 15,000 85,000 15,000 300,000 Expenditures: '.. Design - - _ - _ ... .. _... ... _ Right or Way - Construction 15,0,000. 00 85 1500 ,0,000 85 15,000 300 000 Total Expenditure: 15,000 85,000 15,000 80,M i 000 300 000 39 City of Auburn Capital Facilities Plan �APIT4L FACILITIES PLAN 2005-2010 Project Title: Parking Lot Improvement Project No: Project Type: Project Manager. Description: " Slurryseal, restd pe,mintirepag and -landscaping of puWi ng lot next to Safeway . Progress Summary: Impact on Operating Budget Once Completed . This project will have no impact on the operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding Sources: General Fund Revenue - - 50,000 50,000 Grants - - - _ Bond Proceeds Impact Fees Total Funding Sources: 50,000 50,000 Expenditures: Design - _ _ _ Right of Way - - _ _ Construction - 50,000 50,000 Total Expenditure: 50,000 50,000 Forecasted Project Cost: - 2006 2007 2008 2009 - 2010 Total Funding sources: 2005-2010 General Fund Revenue Grants Bond Proceeds - Impact Fees Total Funding Sources: 50,000 Elroenditures: Agri - - - - Right of Way - Construction - - - 50000 Total dhure: 50,000 40 0 i 0 0 11 City of Aubum Capital Facilities Plan ,=ZAPJTALFA'CIL MES PLAN �, X005=2010 Project Title: Neighborhood Revitalization Project No: Project Type: Project Manager., Description:. m , Neighborhood revitalizatlibh has been a high priority for the ncil for several years. With an initial funding level of $100,000 the City complerted the Terminal Park Plan in hou nd is now undertaking improvement projects. The East Main Neighborhood has been selected as the next to nd funding is required to undertake actions the Plan will ultimately recommend. Progress Summary. Impact on Operating Budget Once Completed: This project will have no impact on the operating budget- - Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Proiect Total Funding Sources: General Fund Revenue - - 100,000 100.000 Grants - _ _ Bond Proceeds - - - Impact Fees Total Funding Sources: 100,000 100,000 Ex nditures: Design - - - _ Right of Way - - _ Construction 100,000 100,000 Total Expenditure: 100,000 100,000 Forecasted Project Cost: 2006 2007 2008 2008 2010 Total Funding sources: 2005-2010 General Fund Revenue - - - - - 100,000 Grants - - - - _ - Band Proceeds - Impact Fees Total Funding sources: 100,000 Expenditures: Design Right o1 Way - - - -100 Consfrucdon - OOD Totaf dlture: 100 000 41 City of Auburn Capital Facilities Plan AP►7AL FACIIJM PLAN y$� 2005-2010 Project Title: Justice Center Parking Project No: Project Type: Project Manager: Description:. ;- _ i-� Purchase: additional parking for Justice Center Progress Summary: Impact on Operating Budget Once Completed: This project will have no impact on the operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2001 Estimate - 2005 Budoet Proiect Total Funding Sources: General Fund Revenue - - 300,000 300,000 Gnnts - - - _ Bond Proceeds - - Impact Fees Total Funding Sources: 300,000 300,000 Expenditures: Design - - _ _ Right or Way - _ _ - Construction 300,000 300,000 Total Expenditure: 300,000 300,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 General Fund Revenue - - - - - 300.000 Grants - Bond Proceeds - hn Fees Total Fumgng Sources: - - - - 300,000 Exoenditares: Design - Right of Way -- Consfruction - - - - 300.000 Total diture: 300,0001 E% 0 L CJ • City of Auburn Capital Facilities Plan FIRE PROTECTION Current Facilities The Auburn Fire Department provides fire protection and rescue services to a 25 square mile area which includes the City of Auburn, the City of Algona and King County Fire Protection District 31. The Fire Department operates out of three stations which are manned 24 hours per day. The North Station #31 also serves as the department headquarters and includes a hose and training tower. Each station is assigned fire apparatus (Engines and Aid Vehicles). Table F — 1 "Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.22 fire apparatus per 1,000 population is based on the existing inventory (10 fire apparatus) divided by the 2004 citywide population (46,336). The proposed LOS of 0.15 fire apparatus per 1,000 is based on the 2010 planned inventory (10 fire apparatus) divided by the 2010 projected citywide population (68,696). Capital Facilities Projects and Financing No expansion or the fire apparatus inventory is planned during 2005 — 2010. Fire apparatus replacement totaling $250,000 is based on a 20 -year replacement schedule for engines and a 15 -year replacement schedule for aid vehicles. Table F-2 shows the proposed financing plan. A fire station rep lacement/relocation project totaling $10,000,000 is planned. This project is shown in the General Municipal Buildings section. Impact on Future Operating Budgets There are no operating budget impacts forecasted for fire protection during the six years 2006 — 2011. 43 TABLE F —1 City of Aubum Capital Facilities Plan FACILITIES INVENTORY FIRE DEPARTMENT Bus, Reserve Van, Disaster Response Vehicle " Telesqurt 44 0 40 CAPACITY FACILITY Fire Apparatus Aid Vehicles Other LOCATION Existing Inventory Stations North Station #31 1101 "D" Street NE, Auburn First Line 1 1 Reserve 1 1 South Station #32 First Line 1 1 1951 "R" Street SE Reserve 1 1 GSA Station #33 First Line 1 0 2815 "C" Street Southwest Reserve 1" 0 3' Total 6 4 3 Proposed Inventory Additions None 0 0 0 Total Proposed Capacity Projects 0 0 0 2010 Projected Inventory Total 6 4 3 Bus, Reserve Van, Disaster Response Vehicle " Telesqurt 44 0 40 I• KI TABLE F - 2 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN PROJECTS AND FINANCING REPROTECTION 2009 Non -Capacity Projects: Apparatus Rep,�eement a Cost - 50,000 50,000 50,000 50,000 50,000 250,000 Rev - General Fund - 50,000 50,000 50,000 50,000 50,000 250,000 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects - - - - - Non -Capacity Projects - 50,000 50,000 50,000 50,000 50,000 250,000 Total Costs - 50,000 50,000 50,000 50,000 50,000 250,000 REVENUES: Rev - General Fund - 50,000 50,000 50,000 50,000 50,000 250,000 Total Revenues - 50,000 50,000 50,000 50,000 50,000 250,000 BALANCE - - - - - 45 City of Auburn Capital Facilities Plan CAPITAL FACILITIES; PLAN Project Title: Apparatus Replacement Project No: Project Type: Project Manager: Description: _ 4 Fire apparatus replacement is based on a20 -year replaced schedule for engines and a 15 -year replacement schedule foraid vehicles: - Progress Summary. Impact on Operating Budget Once Completed: No impact on operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: - 2006 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Project Totaf Funding Sources: General Fund Revenue - - Grants - - - - Bond Proceeds - - Impact Fees Total Funding sources: Expenditures: Design - - Right or Way - - - Construction Total Expenditure: Forecasted Project Cost: 2005 2007 2008 2009 2010 Total Funding sources: 200.5-2010 General Fund Revenue 50,000 50,000 50,000 50,000 50,000 250,000 Grants - - - Bond Proceeds - - - - Impact Fees Total Funding Sources: 50,000 50,000 50,000 501000 50,000 250,000 Exoendjtums: Design 50.000 50,000 50,000 50,000 50,000 250,000 Right or Way - - - - - ConsbucNon - Total Ex diture: 50,000 50 000 50 000 50,000 50,000 250,000 46 0 0 0 City ofAubum Capital Facilities Plan GENERAL MUNICIPAL BUILDINGS Current Facilities The current inventory of City government administration and operations facilities include 85,505 square feet for general government operations, 62,188 square feet for police services, and 31,673 square feet for fire protection, for a total of 179,346 square feet. Table GM — 1 "Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 3,871 square feet per 1,000 population is based on the existing inventory divided by the 2004 citywide population of 46,336. The proposed LOS of 2,611 square feet per 1,000 population is based on the projected inventory divided by the 2010 projected citywide population of 68,696. Capital Facilities Projects and Financing The City's General Municipal Buildings facilities include four capital projects at a cost of $20,630,487. The projects include (1) $10,300,000 to exercise the lease option on the Justice Center should Council choose to exercise this option, (2) $10,000,000 for fire station replacement/relocation, and (3) $330,487 for City plaza restoration and miscellaneous building improvements. Table GM — 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets Operating budget impacts annually are not yet forecasted for general municipal buildings during the six years 2006 — 2011. 47 TABLE GM —1 City of Auburn Capital Facilities Plan Facilities Inventory General Municipal Buildings FACILITY CAPACITY (Square Feet) LOCATION Existing Inventory General Government: City Hall (excluding Police facilities) 37,700 25 W. Main Street City Maintenance & Operations Facility 25,855 1305 C Street SW Parks & Recreation Administration Bldg 7,000 910 9th Street SE Street Waste Handling Facility 2,750 1305 C Street SW Municipal Court (Justice Center) 12,200 340 E Main Street Total 85,505 Police: Stations - Headquarters (Justice Center) 24,800 340 E Main Street Supermall Substation 1,208 1101 Supennall Way Bicycle Storage 300 15 N. Division Street Gun Range 32,880 1600 Block 15th Street NW Seized Vehicle Parking Stalls 3,000 C Street SW (GSA) Total 62,188 Fire: Stations - North Station #31 12,220 1101 D Street NE South Station #32 5,200 1951 R Street SE GSA Station #33 9,533 2815 C Street SW Other Fadlities - North Station Maintenance Structure 4,700 1101 D Street NE Total 31,653 Total Existing Inventory 179,346 Proposed Capacity Projects None 0 Total Proposed Capacity Projects 0 2010 Projected Inventory Total 179,346 48 0 11 0 9 1* TABLE GM - 2 City ofAubum Capital Facilities Plan CAPITAL FACILITIES PLAN PROJECTS AND FINANCING GENERAL MUNICIPAL BUILDINGS Non -Capacity Projects: Rev - General Fund 1. Justice Centers - 5,680,487 Rev - REET it Cost 10,300,000 - - - - - 10,300,000 Rev - General Fund 5,300,000 - 700,000 - 5,300,000 Rev - REET 5,000,000 BALANCE - 5,000,000 2 Fire Station Replacement/Relocation Cost 750,000 -9,250,000 - 10,000,000 Rev - General Fund 50,000 - 50,000 Rev - G.O.Bonds - 9,250,000_ - 9,250,000 Rev - Mitigation/Impact Fees 700,000 700,000 3 City Hall: Plaza Restoration Cost 180,487W 180,487 Rev - General Fund 180,487 180,487 4 Miscellaneous Building Improvements, Cost 150,000 150,000 Rev - General Fund 150,000 150,000 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects - - - - Non -Capacity Projects 11,380,487 9,250,000 Total Costs 11.380.487 9.250.000 REVENUES: Rev - General Fund 5,680,487 - 5,680,487 Rev - REET 5,000,000 . - 5,000,000 Rev - G.O. Bonds - 9,250,000 - 9,250,000 Rev - Mitigation/Impact Fees 700,000 - 700,000 Total Revenues 11,380,487 9,250,000 - - - - 20,630,487 BALANCE - - - - - _ 49 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 20052010 177 Project Title: Justice Center Project No: Project Type: Project Manager: Description: The Justice Center iaa2 story complex with approximately 37,000 square feet The Police headquarters encompasses 24,8Wsquare feet and includes facilities forthe administration, patrol, detectivelinvestigation, and records division. The space also includes areas for evidence storage and processing, K-9, SWAT vehichles, archives and general storage. The remaining square footage is for court rooms, Judges chambers, clerical staff, prosecution and probations services.' Progress Summary: The building is schedule for completion late 2004. Impact on Operating Budget Once Completed: The maintenance cast on the building is considered to be minimal in the first years of operation. There will be an increase in the utility budget, to be determined after one year of history. Utilities for energy may increase 50%-75%. The annual lease cost is approximately $735,000 per year, or should the City choose to exercise the lease option, the one time payment is $10,300,000. This amount is included in the budget should Council choose to exercise the e option: ... _ 2'000 YTD Actual Budget Budget Expenditures Balance Adopted Budget 10,300,000 10,300,000 Budget Amendments Adjusted Budget 10,300,000 - 10,300,000 NGrlVlry: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Tota! Funding Sources: General Fund - 5,300,000 5,300,000 REET 1 - - 5,000,000 51000,000 Total Funding Sources: 10,300,000 10 300,000 Expenditures: Acqulsltion - - 10,300,000 10,300,000 Total Expenditure: 10,300,000 10,300,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Fundin sources: nrxls. 7rMn REE71 - - - - 5.000,0004 Total Funding sources: - - - _ _ lostn nm Acquisglon _ _ - - 10,300,000 4 Total Se dlture: 10,300,&0 6101 0 P 0 0 0 City of Auburn Capital Facilities Plan -CAPJTALFACfIJTIES PLAN � `-2005-2010 - Project Title: Fire Station Relocation Project No: Project Type: Project Manager: Description Relocate two Fimtla6'ons, build downtown station an er remodel station 32 or partner with the Mucideshoot Tribe to relocate.: Progress Summary.- ummary:Investigating Investigatingcosts at this time. Impact on Operating Budget Once Completed: Unknown Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments - Adjusted Budget Activity: 2000 YE 2005 Year End Prior to 2000 Estimate 2005 Budget Project Total Funding sources: Fire Capital -Fund 328 - 50,000 50,000 Grants - - - - Bond Proceeds - - - _ Fire Mitigation Fees 700,000 700,000 Total Fundin sources: 750,000 750,000 Expenditures: Design - - 50,000 50,000 Land Aquisition - - 700,000 700,000 Construction Total Expenditure: 750,000 750,000 Forecasted Project Cost: 2006 200 2006 2009 2010 Tow . Funding sources: 2W5-2010 Fire CapdaWund 328 _ _ _ _ _ 50.000 Grants - Bond Proceeds 9250,000- - - - -- 9,250.000 Fire es on Fe 700,000 Total Funding Sources: 9250,000 - 10,000,000 ExoendiWres: Design - LandAquisidon - _ _ _ _ _ - 501000 700.000 Construction 9250,000 Total Expenditure: 9,250,000 10,000,000 51 City of Auburn Capital Facilities Plan de>: %CAPITAL FACILITIES PLAN 2005-2010: Project Title: City Hall Court Yard Improvements Project No: C305A Project Type: Restoration Project Manager., Lynn Rued Description: aF., The Planning Department is ePuating various akemativesfor ing courtyard improvements at City Hall. The improvements will include replacement of pavement materials lan concrete benches. - - pe elements, and maintenance of failed Progress Summary., Impact on Operating Budget Once Completed: - This project will have no significant impact on the operating budget Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Buda et Project Total Funding Sources: General Fund 533 18,980 180,487 200,000 Grants - - - _ Bond Proceeds Impact Fees Total Funding Sources: 533 16,980 180,467 200,000 Expenditures: Design 533 18,980 20,000 39,513 Right of Way - - -- Construction 160,487 160,487 Total Expenditure: 533 18,980 180,487 200,000 Forecasted Project Cost: 2006 2007 2008 2009 - 2010 Total Project - Funding Sources: General fund - - - - - 200,000 Grants Bond Proceeds - - knpactFom Total Funding Sources: - 200,000 Expenditures: Design - - - . _. 39,513 _ Right ofWay CaraUveUon _ 1 Totd Ex ndkure: - 2:000000 9 0 Ll 0 0 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 Project Title: Miscellaneous Building Improvements Project No: Project Type: Noncapacity Project Manager: Description This project will consist of HVAC improvements, otheffibilding improvements, and facility and way finding signage. Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the operating budget..;. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments 53 Adjusted Budget Activity., 200/ YE 2005 Year End Prior to 2000 Estimate 2005 Budget Project Total Funding Sources: General Fund - - 150,000 150,000 Grants - - Bond Proceeds - - - - Impact Fees Total Funding sources: 150,000 150,000 Expenditures: Design - - - Right or Way - - - Construction 150.000 150,000 Total Expenditure: 150,000 150,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Project Funding Sources: General Fund _ _ _ _ _ 150.ggg Grants - Bond Proceeds - lm ct Fees Total Funding Sources: 150,000 Expenditures: Design - - - - - Right ofWay - - - - - Co Son 150 000 Total Expenditure: - _ _ 150A00 53 City of Auburn Capital Facilities Plan GOLF COURSE Current Facilities The City of Auburn owns and operates the 18 -hole Auburn Municipal Golf Course. A PGA Class A professional is contracted to collect greens fees, operate the pro shop and snack bar, provide golf carts for rent, and offer a lesson program. Table GC -1 Facilities Inventory lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of .39 holes per 1,000 population is based on the existing inventory divided by the 2004 citywide population of 46,336. The proposed LOS of .26 holes per 1,000 population is based on the projected inventory divided by the 2010 projected citywide population of 68,696. Capital Facilities Projects and Financing City golf course facilities include three capital projects at a cost of $3,290,000, which include (1) $2,775,000 to construct a new clubhouse and parking facility, and (2) $515,000 for rebuilding fairways and greens. Table GC -2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for new golf course facilities during the six years 2006 — 2011. 54 E 0 0 City of Auburn Capital Facilities Plan Table GC -1 Facilities Inventory Golf Course 55 CAPACITY FACILITY # of holes LOCATION Existing Inventory Auburn Municipal Golf Course 18 29639 Green River Road Total Existing Inventory 18 Proposed Capacity Projects None 0 Total Proposed Capacity Projects 0 2010 Projected Inventory Total 18 55 City of Auburn Capital Facilities Plan TABLE GC -2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COURSE _ Non -Capacity Projects 1 Construct New Clubhouse 8 Parking,-: Cost 2,775,000 Rev - G.O. Bond - 2,775,000 - - - - 2 Rebuild No. 11 Fairway &Green Cost 165,000 Rev - Greens Fees - 165,000 - - - - - 3 Renovate Holes 1, 2, and 10 - 3,290,000 Cost - 350,000 - - - - Rev - G.O. Bond - 350,000 - - - - SUMMARY: COSTS AND REVENUES COSTS: Non -Capacity Projects Total Costs 3,290,000 - REVENUES: Rev - G.O. Bond - 3,125,000 - Rev - Greens Fees - 165,000 - Total Revenues - 3,290,000 BALANCE _ _ _ 56 2,775,000 2,775,000 165,000 165,000 350,000 350,000 - 3,290,000 3,125,000 165,000 - 3,290,000 0 City of Aubum Capital Facilities Plan CAPIT FACJUT/ES PLi4N' .. 3005-2090 Project Title: Clubhouse/Parking Lot Construction Project No: Project Type: Project Manager: Daryl Faber Description: Design and construct GTN Course :Clubhouseand Parking tsproject-will replace epsbng clubhouse and inadequate packing space..:. Progress Summary: Completing feasibility study in 2004. Impact on Operating Budget Once Completed: „ Will create revenue sufficient to pay off bond debt Current Year Budget: 2005 YTD actual Budget Budget Expenditures Balance Adopted Budget - - BudgetAmendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 200/ Estimate 2005 Budget Preiect Tota! Funding sources: Unrestricted Gol/Revenue - - - Grants - Bond Proceeds - - - Impact Fees Total Funding Sources: Ex enditums: Design - - - - Righto/Way - - - - Construction Total Expenditure: Forecasted Project Cost. 2006 2007 2008 2009 2010 Total Funding sources: 2005-2010 Unrestricted Gaff Revenue - Grants - Bond Proceeds 2,775,000 - - - $775,000 impact Fees Total Funding Sources: 2,775,000 2,775,000 Expenditures: -- Design 250.000 - - - - 250,000 RightorWay construction 2,525,000 2,525,000 Total Expenditure. 775 D00 - 775 pop 57 City of Auburn Capital Facilities Plan .CAPITAL AAC/UTlES PLAN �tw 2005-2010 Project Title: Rebuild Hole 11 Project No: Project Type: Project Manager: Kevin Van Description: _ Rebuild the green, tee, anday Install drainage and imgati u tem, and add 6 - 8 in layer or sand throughout the site: ti.. Progress Summary: Impact on Operating Budget Once. Completed. Year-round playable hole that will be safer for patrons, both visibly and routing wise, should increase the rounds played resulting in increased revenues. _ Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: - 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budaet Proiect Total Funding Sources: Unrestricted Golf Revenue - Grants - Bond Proceeds - Impact Fees Total Funding Sources: Expenditures: Design Right of Way Construction Total Expenditure: Forecasted Project Cost: -'.. 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 Unrestricted Goff Revenue 165.000 - - Grants - - 165,000 Bond Proceeds hnpactF@w _ - Total Funding Sources: 165.000 165.000 Expenditures: Design _ Right of Way - Construction 165,000 - - - 165,000 Total re: 165,000 11W000 58 9 City of Auburn Capital Facilities Plan . CAPITAL FACILITIES PLAN 2005-2010 Project Title: Reconstruct Holes 1, 2, 10 Project No: Project Type: Project Manager. Kevin Van 0 0 Description:; eY Renovate holes 1,2,10 Progress Summary: In design, all permits have been secured. Impact on Operating Budget Once Completed: This project will increase the number of rounds played throughout This project will complete all major golf renovations which began in 1988. -. Current Year Budget: 2005 YTD actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2004 Estima a 2005 Budoet Proiect Total Funding Sources: General Fund - Grants - Bond Proceeds - User Fees Total Funding Sources: Expenditures; Design Right of Way Construction Total Expenditure: Forecasted Project Cost: 2008 2007 2008 2009 2000 Total Funding Sources: 2005-2000 General Fund Grants - Bond Proceeds 350,000 - _ _ 350,000 User Fees Total Funding Sources: 350,000 350,000 Expenditures: Design 15,000 - - - - 15,000 Right of Way - _ _ _ _ _ Construction 335,000 - - 335000 Tofal Expenditure: 350,000 35% 71 City of Auburn Capital Facilities Plan LIBRARY Current Facilities In 1997, the residents of Auburn voted to become part of the King County Library District. The Auburn Library, now a part of the King County Library System, serves the City of Auburn and outlying areas. Table L-1 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 324 square feet per 1,000 population is based on the existing inventory divided by the 2004 citywide population of 46,336. The proposed LOS of 218 square feet per 1,000 population is based on the projected inventory divided by the 2010 projected citywide population of 68,696. Capital Facilities Projects and Financing City library facilities include no new capital projects during 2005 — 2010. Impact on Future Operating Budgets Since there are no capital projects scheduled during 2006 — 2011, no operating budget impacts are forecasted for new library facilities. 0 City of Aubum Capital Facilities Plan 0 TABLE L-1 Facilities Inventory Auburn Library • CAPACITY FACILITY (Square Feet) LOCATION Existing Inventory Auburn Library 15,000 8099th Street SE Total Existing Inventory 15,000 Proposed Capacity Projects None 0 Total Proposed Capacity Projects 0 2010 Projected Inventory Total 15,000 • City of Auburn Capital Facilities Plan PARKS AND RECREATION Current Facilities The City of Auburn's park system consists of a total of 566.5 acres of neighborhood and community parks, special use areas, open space, and linear parks (trails). The 150 -acre Auburn Municipal Golf Course is identified as a separate public facility in this report, and is not included in the Parks and Recreation inventory. Table PR — 1 "Facilities Inventory" lists all park and recreation land in the City's park system along with their current capacity and location. Level of Service (LOS) The current LOS provided by the City's park system represents the current inventory of City -owned park acres divided by the 2004 City population (46,336). This equates to 1.15 acres per 1,000 population for neighborhood parks, 4.92 acres per 1,000 population for community parks, 0.69 acres for linear parks, 4.29 acres for open space, and 1.17 acres for special use areas. The proposed LOS provided by the City's park system represents the planned 2010 inventory of City -owned park acres divided by the 2010 projected City population of 68,696. This equates to 0.77 acres per 1,000 population for neighborhood parks, 3.44 acres per 1,00 population for community parks, 0.46 acres per 1,000 population for linear parks, 2.90 acres per 1,000 population for open space, and 0.79 acres per 1,000 population for special use acres. Capital Facilities Projects and Financing Parks and Recreation facilities include eleven capital projects at a cost of $5,570,000. Table PR — 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table PR — 3 shows, operating budget impacts of $125,000 are forecasted for parks and recreation facilities during the six years 2006 — 2011. 62 i 0 City of Aubum Capital Facilities Plan TAB101 LE PR —1 FACILITIES INVENTORY PARKS AND RECREATION TOTAL PARK LAND i L� FACILITY CAPACITY Acres LOCATION NEIGHBORHOOD PARKS Existing Inventory: Auburndale Park 10.0 31700 108th NE Ballard Park 0.7 37th & "R" Street SE Cameron Park 3.9 Lemon Tree Lane & Academy Dr. Cedar Lane Park 8.3 25th & "K" Street SE Dykstra Park 1.7 1533 22nd Ave NE Forest Villa Mini -Park 0.2 17th & Fir Street SE Gaines Park 1.4 11th NW & W Valley Highway Indian Tom Park 0.4 6th & Henry Road NE Lakeland Hills Park 5.0 5401 Olive Avenue SE Rotary Park 4.0 27th & Alpine Street SE Shaughnessy Park 3.5 21st & Hemlock SE Scootie Brown Park 1.7 8th & Henry Road NE Terminal Park 1.2 12th & "C" Street SE Jornada Park 1.9 1440 U Court NW Auburndale 2 Park 9.3 29700 118th Street SE Total Neighborhood Parks 53.2 Proposed Capacity Projects None 0.0 Total Proposed Capital Projects 0.0 2010 Projected Inventory Total - Neighborhood Parks 1 53.2 COMMUNITY PARKS Existing Inventory: Brannan Park 21.7 26th & "M" Street NE Veterans Memorial Park 8.5 Park Avenue & AWN Fenster/Green River Access 13.4 10520 Auburn & Black Diamond Rd Fulmer Field 5.0 5th & "K" Street NE Game Farm Park 53,0 3226 "V" Street SE 63 City ofAubum Capital Facilities Plan Game Farm Wilderness Park 20.0 2401 SE Stuck River Road GSA Park 6.6 "C' Street SW & 15th SW Isaac Evans Park 14.9 29627 Green River Road NE Les Gove Park 20.5 11th & AWS Mill Pond 4.0 600 Oravetz Road Olson Canyon Farmstead 15.0 28728 Grean River Road Roegner Park 21.6 601 Oravetz Road Lea Hill Park 9.0 SE 319th & 124th Street SE Sunset Park 15.0 1306 69th Street SE Total Community Parks 228.2 Proposed Capacity Projects Lakeland Hills Community Park 8.0 Total Proposed Capital Projects 8.0 2010 Projected Inventory Total - Community Parks 236.2 LINEAR PARKS Existing Inventory: Interurban Trail 25.4 Lakeland Hills Trail 2.3 5401 Olive Avenue SE White River Trail 4.1 Total Linear Parks 31.8 Proposed Capacity Projects None 0.0 Total Proposed Capital Projects 0.0 2010 Projected Inventory Total - Linear Parks 31.8 SPECIAL USE AREAS Existing Inventory: Bicentennial Park 1.4 Highway 18 & AWS Centennial Viewpoint Park 0.7 600 Mountain View Drive City Hall Plaza 0.9 25 W Main Clark Plaza 0.2 15th & AWN Downtown Mini -Mall 0.1 E Main & "B" Street SE Mountain View Cemetery 50.0 2020 Mountain View Drive Pioneer Cemetery 0.8 8th & AWN Slaughter Memorial 0.2 3100 AWN Total Special Use Areas 54.3 Proposed Capacity Projects None 0.0 Total Proposed Capital Projects 0.0 2010 Projected Inventory Total - Special Use Areas 1 54.3 64 0 0 i • City of Auburn Capital Facilities Plan OPEN SPACE Existing Inventory: Clark Property 25.0 1600 Oravetz Road Game Farm Open Space 87.0 2400 Stuck Golf Course Open Space 42.0 29639 Green River Road Olson Canyon Open Space 45.0 28728 Green River Road Total Open Space 199.0 Proposed Open Space Projects None 0.0 Total Proposed Capital Projects 0.0 2010 Projected Inventory Total - Open . Space 199.0 65 TABLE PR - 2 City of Aubum- Capital Facilities Plan CAPITAL FACILITIES PLAN PROJECTS AND FINANCING ' ]PARKS AND RECREATION �.ayacny r�yacw. ' Community Parks 1... Lakeland Hills Communriy_Park (Banes)--,-,. Cost 260,000 - - _ _ - 260,000 Rev - Grant 30,000 - - - - - 30,000 Rev -Developer 180,000 - - - - 180,000 Rev - General Fund 50,000 - - - - - 50,000 Subtotal 260,000 - - - - - 260,000 Non -Capacity Projects: Community Parks 2 Olson Canyon Farm _ Cost - 300,000 250,000 250,000 250,000- 1,050,000 Rev - Grant - 150,000 125,000 125,000 - - 400,000 Rev - Private Donation - - - - 125,000 - 125,000 Rev. General Fund - 150,000 125,000 125,000 125,000 525,000 -3... Los Gove Park Improvement" _ _.-_.. ..,,- ._,..._._.,.�»..-....... ,.. _._.,.. _... .. ._... _ . ._ ...._- ... ., Cost - 250,000 250,000 Rev -General Fund - 200,000 - - - - 200,000 Rev - Grant - 50,000 - - - - 50,000 4 Veteran's Park. Redevelopment Cost - 200,000 - - - - - 200,000 Rev - General Fund - 120,000 - - - - 120,000 Rev - Private Donation - 80,000 - - - - 80,000 5 Fenster Farm Site Plan/Phase 1 Development Cost 30,000 570,000 - - - - 600,000 Rev -General Fund 30,000 30,000 - - - - 60,000 Rev - Grant - 540,000 - - - - 540,000 6 Jacobsen Tree Farm Site Plan Cost 30,000 - - - - - 30,000 Rev- General Fund 30,000 - - - - - 30,000 7 Interurban Trail Cost - 50,000 - - - - 50,000 Rev - General Fund - 50.000 - - - - 50,000 8 Fulmer Park Addition Cost 200,000 200,000 - - - - 400,000 Rev - General Fund 200,000 150.000 - - - - 350,000 Rev - Grant - 50,000 - - - - 50,000 9 Misc. Improvements Cost - 50,000 100,000 50,000 100,000 50,000 350,000 Rev - General Fund - 50,000 100,000 50,000 100,000 50,000 350,000 10 Park Acquistions Cost - 600,000 200,000 600,000 200.000 600,000 2,200,000 Rev -REET - 200,000 200,000 200,000 200,000 200,000 1,000,000 Rev - Grant - 400,000 - 400,000 - 400,000 1,200,000 ��q 0 11 City ofAubum Capital Facilities Plan COSTSIREVENUES 2005 2006 2007 2008 2009 2010 TOTAL Special Use Areas Non -Capacity Projects 155,000 155,000 155,000 Community Parks - -11 Pubirc Put 550,000 900,000 550,000 Special Use Areas 30,000 30,000 30,000 30,000 30,000 Cost- 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Rev - General Fund 30,000 30,000 30,000 30,000 30,000 30,000 180,000 - Subtotal 290,000 2,250,000 580,000 930,000 580,000 680,000 5,310,000 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects Community Parks 260,000 - - - - Subtotal 260,000 - - - Non -Capacity Projects 155,000 155,000 155,000 Community Parks 260,000 2,220,000 550,000 900,000 550,000 Special Use Areas 30,000 30,000 30,000 30,000 30,000 Subtotal 290,000 2,250,000 580,000 930,000 580,000 Total Costs 550,000 2,250,000 580,000 930,000 - 580,000 REVENUES: 5,130,000 - 180,000 680,000 5,310,000 Rev - General Fund 340,000 730,000 155,000 155,000 155,000 Rev - REET - 250,000 300,000 250,000 300,000 Rev - Grant 30,000 1,190,000 125,000 525,000 - Rev - Developer 180,000 - - - - Rev - Private Donation - 80,000 - - 125,000 Total Revenues 550,000 2,250,000 580,000 930,000 580,000 BALANCE 67 260,000 650,000 5,130,000 30,000 180,000 680,000 5,310,000 680,000 5,570,000 30,000 1,565,000 250,000 1,350,000 400,000 2,270,000 - 180,000 - 205,000 680,000 5,570,000 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN Project Title: Lakeland Hills Community Park Project No: Project Type: Capacity Project Project Manager. Description: w.�-. x Develop passive parks, play toy, irrigation, etc. Progress Summary: Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Project Total Funding Sources: KCYSFG - 30,000 30,000 Rev -Developer - - 180,000 180,000 General Fund - - 50,000 50,000 Impact Fees Total Funding Sources: 260,000 260,000 Expenditures: Design- - - 10,000 10,000 Right of Way - _ _ _ Construction - 250,000 250,000 Total Expenditure: 260,000 260,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 KCYSFG _ 30,000 Rev -Developer _ _ _ - _ 1,000 General Fund _ _ - - - 50 50.000 impact Fees _ Total Funding Sources: _ 260,000 Expenditures: - Design - - - - 10.000 Right of Way - Construction - - - 250.0001 Tote/Expenditure: 260.0001 m 0 E 0 City of Auburn Capital Facilities Plan is CAPITAL FACILITIES PLAN 2005-7010 Project Title: Olson Canyon Farm Project No: Project Type: Project Manager: 0 Description , , - . Implement master 0Building and grounds, Progress Summary: Design for stream restoration under way. Proposed projects are dependant upon grants. Impact on Operating Budget Once Completed: TBD _ Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding Sources: General Fund - - - - Gnats - - - - Private Donation - - - - Impact Fees Total Funding Sources: Expenditures: Design - - - - RightofWay Construction Total Expenditure: Forecasted Project Cost: - 2005 2007 2008 2009 2010 ;._.Total..�.- Fgndin Sources: 2005-2010 General Fund 150.000 125,000 125,000 125,000 - 525,000 Grants 150,000 125,000 125,000 - - 400,000. Private Donatlon - - - 125.000 - ._ 125,000 Impact Fees Total Funding Sources: 300,000 250,000 250,000 250,000 1,050,000 Ex mWitures: Design - - _ _ - Right ofWay - - _ Construction 300.000 250,000 250,000 - 250.000 - 1,050000 Total Expenditure- 300,000 250,000 250,000 250,000 1,050.0001 M1 City of Auburn Capital Facilities Plan CANTAL FAC/LMESPLAN 2Q052090' Project Title: Les Gove Park Improvement Project No: Project Type: Park Renovation Project Manager. Description: Irrigation, playground, drinkmgtountains, and ballfield enhanceme Aw Progress Summary.- ummary:Master MasterPlan Update in Progress. Impact on Operating Budget Once Completed: - Increased maintenance of $10,000. Current Year Budget: 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding Sources: General Fund Grants Bond Proceeds Impact Fees Total Funding Sources: Expenditures: Design Right of Way - Construction Total Expenditure: Forecasted Project Cost: 2006 2007 2008 2809 2010 - - Total . Funding Sources: 2005-2010 General Fkmd 200,000 - _ _ _ 200,000 Grants 50.000 _ _ Bond Proceeds -Impact _ _ 50,000 Fees Total Funding Sources: 250,000 250 ggg Expenditures: Design 25,000 - - - 25,000 Right of Way - Construction 225,000 - 226 000 ' TotatExpenditure. 250,000 250.000 70 40 is 0 0 City of Aubum Capital Facilities Plan CAPITAL FAC%LMES PLAN ' r_ 26 Project Project Title: Veteran's Park Redevelopment Project No: Project Type: Community Building Replacement Project Manager: Description: . Community BuiidinQReplacement. Progress Summary.- Matching ummary.Matching Funds are avalable through the American Legion Post 78. Impact on Operating. Budget Once -Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - BudgetAmendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Sudoet Project Total Funding Sources: General Fund - - American Legion Post 78 Grants Impact Fees Total FundingSources: Ex enditures: Design Right o1 Way construction Total Expenditure: Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 General Fund 120,000 - - - 120,000 American Legion Post 78 80,000 - _ _ 80.000 Gana knp&ct Fees Total Funding Sources: 200,000200 D00 Expenditures: Design 20.000 - - - 20,000 Right of Way- Construcdon 180.000 Total Ex diture: 200,000 200,000 71 City of Auburn Capital Facilities Plan _ CAPITALLFACILMES,PLAN -2010:", Project Project Title: Fenster Farm Site Plan/ Phase 1 Development Project No: Project Type: Project Manager: Description:r Coordinate with King CountAnd State on development with n habitat area. r 1 . Progress Summary: Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Espendnurea Balance Adopted Budge Budget Amendments - Adjusted Budget - Activity. 2006 YE 2005 Year End Prior to 2006 Estim 2005 Budoet Project To[af Funding Sources: General Fund - 30,000 30,000 State Salmon recovery fund - - - - State Aquatic Lands Enhancement - - - Im act Fees Total Funding Sources: 30,000 30,000 Expenditures: Design - - 30,000 30,000 Right of Way - - - - Construction Total Expenditure: 30,000 30,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005-2010 General Fund 7,000 60,000 State salmon recovery fund 240,000 - - - - 240,000 State Agtmdc Lands Enhancement 300,000 - - - 300,000 impactF,ses _ - Total Funding Sources: 570,000 - 600.000 Design 25.000 _ _ _ - 55,000 ' Rigid of Way _ _ Construetlon 545,000 545000 Tota Expenditure: 570,000 600000 WA 0 0 • 0 u 0 City of Auburn Capital Facilities Plan "CAPITAL_ FACIU77M' LAN F �= 005-2010 Project Title: Jacobsen Tree Farm Site Plan Project No: Project Type: Park Development Project Manager. Description Coordinate with Jon Master Site Plan 1br29 acre-* 'This project is contingent upon incorporation and City Council direction. Progress Summary: Impact on Operating Budget Once Completed: , Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity., 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Project Total Funding Sources: General Fund - 30,000 30,000 Grants - - - _ Bond Proceeds - Impact Fees Total Funding Sources: 30,000 30,000 Expenditures: Design - - 30,000 30.000 Right or Way - - - _ construction Total Expenditure: - 30,000 30,000 Forecasted Project Cost. 2006 2007 2008 2008 2010 - -- Total -..: Funding Sources: 2005-2010 General Fund - _ _ _ - _ 30,000 Grants Bond Pmcamis Impact Fees _ - - Total Funding Sources: 30,000 Expenditures: Design - - - - - 30.000 Right of Way - - - - - construction - Total Expenditure: 30 000 73 City of Aubum Capital Facilities Plan CAMALAACILITIES,PLAN foil Project Title: Interurban Trail Project No: Project Type: Project Manager: Description: Trailenhancements to indu irrigation and landscaping at maj� tersections. Five major sites have een denoted. „y Progress Summary: Impact on Operating Budget Once Completed: Increased annual maintenance of $5,000. ' Current Year Budget: 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate' 2005 Budoet Project Tota! Funding Sources: General Fund - - - Grants - Bond Proceeds - - - Impact Fees Total Funding Sources: Expenditures: Design - - - - Right of Way _ _ - construction - Total Frr enditure: Forecasted Project Cost: 2006 2007 2008 2009 2010 .... Total Funding Sources: 2005-2010 General Fund 50,000 - - - _ - _ _ 50,000 Grants - Bond Proceeds - - Impact Fees Total Funding sources: 50,000 50,000 ExoerMhures: - '.. Design - .Right of Way - construction 50.000 _ 50.000 Total Expenditure., 50,000 50,000 74 • 9 i 0 City of Aubum Capital Facilities Plan Project Title: Project No: Project Type: Project Manager. .-CAPITAL FACIU77ES PLAN 2005-2010 Fulmer Park Addition Park Expansion Dan Scamporlina Description. ", ,Develop addfi" ona rk land exchanged from waterOpporbinity to purchase property to NE to meet park capacity. I Progress Summary. Considering acquisition of neighboring property to increase parking and recreational amenities, including parking expansion: Impact on Operating Budget Once Completed: Increase of Park Maintenance of $10,000 ` Current Year Budget: 2005 YTo Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 200/ YE 2005 Year End Prior to 2001 Estimate 2005 Budget Proiect Poral Funding Sources: General Fund - 200,000 200,000 REST _ Grants Impact Fees Total FundingSources: 200,000 200,000 Ex enditures: Acquisition - - 200,000 200,000 Right or Way - _ _ _ - Construction Total Expenditure: 200,000 200,000 Forecasted Project Cost: 2006 2007 2008 2=1 2010 Total - Funding Sources: 2005-2010 General Fund 150.000 - - - - _ 350,000 ;.. Grants 5D,000 - - - - ..,..50.000 - knpmf Fees . Total funding Sources: 200,000 - 100,000 Exoendifures: Acquisition - - - _ _ _ 200.000 'Right of way - - .. Construction 200 000 --200 Total Expenditure. 200,000 100 000 75 City of Auburn. Capital Facilities Plan Project Title: Project No: Project Type: Project Manager: CANTAL.', ACILMES PLAN zk4 5.2610Y Misc Improvements Dan Scamporlina Description: Minor park improvements i uding sheltersroofs playground Master Plan: gation and restrooms as denoted in the Parks. Progress Summary: Impact on Operating Budget Once Completed: = ~� No Impact. Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End Prior to 2000 Estimate 2005 Budget Proiect Total Funding Sources: General Fund - REET Bond Proceeds Impact Fees Total Funding Sources: Expenditures: Design Right or Way Construction Total Expenditure: Forecasted Project Cost. zoos tam 2008 Zoog 2010 rout Funding sources: 2005.2010 General Fund SOA00 100,000 50,000 100.000 50,000 350,000 BEET _ _ _ _ _ - Bond Proceeds b"Pact Fees Total Funding Sources: 50,000 100,000 50,000 100,000 50,000 350,000 Exoenditures: Design - - - - Right of Way - - _ cons&uction 50.000 100,1700 50.000 100,000 50.000 350,000 TotalExpenditure: 50,000 100,000 50,000 100,000 50,000 W.0001 76 i 0 11 0 City of Auburn Capital Facilities Plan �AP,lT,+[L�AC/LTlES FLAN X_'-l.�LV 10 t' . Project Title: Park Acquisitions Project No: Project Type: Project Manager. Description: Acquisitions to based on demand and defiaen ding corridors and trails. Progress Summary: Impact on Operating Budget 'Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 200/ YE 2005 Year End Prior to 2000 Es Imate 2005 Budoet Proiect Total Funding Sources: General Fund - - - REET State Grant (IAC) - - - - KCCF Total Funding Sources: Expenditures: Design - - - - Right olWay - - - - Construction Total Expenditure: Forecasted Project Cost: 2006 2007 2008 Zoog 2010 Total —Funding Sources: 2005-2010 General Fund - -- REET 200.000 200.000 200,000 200.000 200,0oo 11000,000 State Grant (uc) 200.000 200,000 200.000 600,000 KCCF 200 000 200 000 200 000 ...600 000 TOW N"ft sources. 600.000 200.000 600.000 200.000 600.000 2,200.000 Expendhures: Design - - - - - Right olWay- Construction 600 000 200 000 600,000 200,000 600 oo0 2,200,000 ToW dKure: 6001000 200,000 600,000 200 000 s00 oo0 &Mn 77 City ofAubum Capital Facilities Plan -CAP,._ITA'L_FAC/LITIES PLAN _.= 2005.2010: Project Title: Public Art Project No: Project Type: Project Manager: Description: t` Public Art Progress' Summary: Arts Commission is completeing inventory and assessment of future needs to be approved by City Council Impact on Operating Budget Once Completed: Limited Current Year Budget: 2005 Y7D actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2006 YE 2005 Year End Prior to 2004 - Estimate 2005 Buda et Project Torai Funding sources: Capital Project Fund 328 30,000 30,000 60,000 Grants - Bond Proceeds - Impact Fees Total Funding sources: 30,000 301000 60,000 Expenditures: Design - _ - Right orWay - Construction 30,000 30,000 60,000 Total Expenditure: 30,000 30,000 60,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005.2010 Capital Project! Fund 328 30,000 30.000 30.000 30,000 30,000 ..180,000 Grants - - - - Bond Proceeds Impact Faes Total Fundy Sources: 30,000 30,000 30,000 30,000 30,000 180,000 Design - _ - _ - Right ofWay construction 30,000 30,000 30,000 30,000 30 000 180 000 Total Expenditure. 30,000 30 OOO 30,000 30,000 30,000 180 000 78 10 0 0 0 TABLE PR - 3 i I[ J City of Aubum Capital Facilities Plan IMPACT ON FUTURE OPERATING BUDGETS PARKS AND RECREATION 79 Capital Projects _ 2006 2007 2008 2009 2010 2011 Total 1 Lakeland Hills Community Park 2 Olson Canyon Farm 3 Les Gove Park - 10,000 10,000 10,000 10,000 10,000 50,000 Improvement 4 Veteran's Park - - _ _ _ _ Redevelopment 5 Fenster Farm Site - Plan/Plase 1 Development 6 Jacobsen Tree Farm - - - _ _ _ Site Plan 7 Interurban Trail - 5,000 5,000 5,000 5,000 5,000 25,000 8 Fulmer Park Addition - 10,000 10,000 10,000 10,000 10,000 50,000 9 Miscellaneous - - _ _ Improvements 10 Park Acquistions - 11 Public Art - _ _ _ Total - 25,000 25,000 25,000 25,000 25,000 125,000 79 City of Aubum Capital Facilities Plan POLICE Current Facilities The City of Auburn Police Department provides a full range of law enforcement services, including jail services, to the City of Auburn. Table P-1 Facilities Inventory shows the correctional facilities inventory with the current capacity and location. Level of Service (LOS) The current LOS of 1.2 beds per 1,000 population is based on the existing inventory divided by the 2004 citywide population of 46,336. The proposed LOS of 0.8 beds per 1,000 population is based on the projected inventory divided by the 2010 projected citywide population of 68, 696. Capital Facilities Projects and Financing The CFP does not include any Police capital facilities projects during 2005 — 2010. Impact on Future Operating Budgets There are no operating budget impacts forecasted for jail facilities during the six years 2006 — 2011. F➢ 11 0 . TABLE P -1 0 C- City of Auburn Capital Facilities Plan Facilities Inventory POLICE - CORRECTIONAL FACILITY 81 CAPACITY FACILITY (Max Occupant) LOCATION Existing Inventory Auburn Correctional Facility 54 25 West Main Street ' Total Existing Inventory 54 Proposed Capacity Projects None 0 Total Proposed Capacity Pro'ects 0 2010 Projected Inventory Total 54 81 City ofAubum Capital Facilities Plan SENIOR CENTER Current Facilities The City of Auburn currently has one Senior Center. Table SC -1 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 272 square feet per 1,000 population is based on the existing inventory divided by the 2004 citywide population of 46,336. The proposed LOS of 183 square feet per 1,000 population is based on the projected inventory divided by the 2010 projected citywide population of 68,696. Capital Facilities Projects and Financing This CFP does not include any senior center capital facilities projects during 2005 — 2010. Impact on Future Operating Budgets Eli There are no operating budget impacts forecasted for the senior center facility during the six years 2006 — 2011. 0 0 82 . TABLE SC -1 0 CJ City of Aubum Capital Facilities Plan Facilities Inventory Senior Center 83 . CAPACITY FACILITY (Square Feet) LOCATION Existing Inventory Senior Center 12,600 808 9th Street SE Total Existing Inventory 12,600 Proposed Capacity Projects None 0 Total Proposed Capacity Pro'ects 0 2010 Projected Inventory Total 12,600 83 City of Auburn Capital Facilities Plan SANITARY SEWER Current Facilities The City's sanitary sewer service area encompasses approximately 30 square miles, of which 20 square miles are within the City limits and the remaining 10 square miles are in Auburn's Adjacent Proposed Annexation area (PAA). The City contracts with King County for sewage treatment and disposal. The City's Sanitary Sewer Utility is responsible for the collection and transmission of wastewater to the King County trunk lines. The City's current inventory of 180 miles of sewer lines serves the City's sewer service area. Table S-1 Facilities Inventory, lists the sewage collection and transmission facilities along with their capacities and locations. Level of Service (LOS) The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level of service (LOS), or design criteria, for the City's sewage collection system. These standards represent the average quantities of sewage that the system must accommodate, for residential, industrial, and commercial development. Capital Facilities Projects and Financing The City's sewage collection facilities include one capacity project ($11,200,000), which primarily represents expansion of the existing collection system; and two non - capacity projects ($4,817,000), which are primarily system renewals, replacements, and repairs. Total 6 -year costs for the three projects are $16,017,000. Table S-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget revenue impacts forecasted for sanitary sewer facilities during the six years 2006 — 2011. 0 r] City of Aubum Capital Facilities Plan TABLE S - 1 FACILITIES INVENTORY SEWAGE FACILITIES 85 CM .A 117Y FACUM -(MGD)--- LOCATION Pump Stations D Street 0.58 "D" Street NE & Auburn Way N. Dogwood 0.29 Dogwood St SE 1500 and 1511, Street SE Eastpoint 0.3 SE t/< of NW '/4 of Sec 05-20-05 (Lakeland Hills) Ellingson 0.72 41 5} Street SE, East of "A" Street SE F Street 0.86 "F" Street SE & 17th Street SE Peasley Ridge 0.36 S 320th St & 53rd Ave S Rainier Ridge 0.29 125th Place SE & South of SE 318th Way Rainier Shadows 0.72 124th Avenue SE & SE 306th Place Valley Meadows 0.18 4th Street SE & "V" Street SE 22nd Street 0.79 22nd Street SE & Riverview Drive R Street 0.14 "R" Street NE & 6th Street NE Riverside 0.58 8th Street NE & 104th Avenue SE 8th Street 0.26 "Y' Street NE & 8th Street NE SIZE FACILITY i LOCATION River Crossings Inverted Syphon 8 & 12 inch Crossing Green River at 26th Street NE 81h Street Bride 8" Crossing Green River at 8th Street NE 85 TABLE S - 2 City ofAubum Capital Facilities Plan CAPITAL FACILITIES PLAN PROJECTS AND FINANCING z SANRARYSEWER'DMSION 6,200,000 4,000,000 1,000,000 - - - 11,200,000 Non -Capacity Projects COSTS/REVENUES 2005 2006 2007 2008 2009 2010 TOTAL Capacity Projects (Expansions) 8,142,000 4,375,000 1,375,000 625,000 1,125,000 1 AWS Sewer Design 8 Construction (C9056) -BOX Capacriy;40% Non4;apacity - Cost cost 6,200,000 4,000,000 1,000,000" - - - -4� - 11,200,000 Rev -Sanitary Sewer Fund 650,000 2,000,000 500,000 - - - 3,150,000 Rev - PublicWorksTrustFund 2,450,000 - - - - - 2,450,000 Rev - Muckleshoot Indian Tribe 3,100,000 2,000,000 500,000 - - - 5,600,000 Subtotal 6,200,000 4,000,000 1,000,000 - - - 11,200,000 Von -Capacity Projects: 6,200,000 4,000,000 1,000,000 - - - 11,200,000 Non -Capacity Projects 1,942,000 375,000 2 Sanitary Sewer: Repair Replacement Program 375,000 4,817,000 Total Costs 8,142,000 4,375,000 1,375,000 625,000 1,125,000 375,000 16,017,00( Cost 1,825,000 250,000 250,000 500,000 1,000,000 250,000 4,075,000 - Rev - Sanitary Sewer Fund 1,825,000 250,000 250,000 500,000 1,000,000- 250,000 .4,075,000 3 Improvements. (431a) =-:. - Cost 117,000 125,000 125,000 125,000 125,000 125,000 742,000 Rev- Sanitary Sewer Fund 117,000 125,000 125,000 125,000 125,000 125,000 742,000 Subtotal 1,942,000 375,000 375,000 625,000 .1,125,000 375,000 SUMMARY: COSTS AND REVENUES Capacity Projects 6,200,000 4,000,000 1,000,000 - - - 11,200,000 Non -Capacity Projects 1,942,000 375,000 375,000 625,000 1,125,000 375,000 4,817,000 Total Costs 8,142,000 4,375,000 1,375,000 625,000 1,125,000 375,000 16,017,00( REVENUES: Rev - Sanitary Sewer Fund Rev - Public WorksTrust Fund Rev - Muckleshoot Indian Tribe Total Revenues BALANCE 2,592,000 2,375,000 875,000 625,000 1,125,000 375,000 7,967,000 2,450,000 - - - - - 2,450,000 3,100,000 2,000,000 500,000 - - - 5,600,000 8,142,000 4,375,000 1,375,000 625,000 1,125,000 375,000 16,017,000 W • 0 9 0 City of Aubum Capital Facilities Plan CAPITAL-FACILMES PLAN Project Title: Auburn Way South Sewer Design & Construction Project No: C9056 Project Type: Expansion 60% - Replacement 40% Project Manager. Jeff Roscoe Description: mnitary Design and replace th sewertransmissicnaafb' ed along the Auburn Way South corridor. This will benefit the City of Aubxim and the Muddeshoot Indian Tn Progress Summary: Parametrix has been hired to design the project for construction to begin in early 2005 with design efforts completed in mid 2005. Impact on Operating Budget Once Completed: This project will have no significant impact on the Sewer Division's operating budget. - Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unresticted Sewer Revenue 331,000 200,000 650,000 1,181,000 P.W a Trust Fund - 2,450,000 2,450,000 Bond Proceeds - _ _ _ Others M! 200,000 3,100,000 3,300,000 Total Funding Sources: 331,000 400,000 6,200,000 6,931,000 Expenditures: Design 296,000 400,000 300,000 996,000 Right of Way 35,000 - - 35,000 Construction 5,900,000 5,900,000 Total Expenditure: 331,000 400,000 6,200,000 6,931,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources., 20052010 Unresticted Sewer Revenue 2,000,000 500,000 - - - 3,150,000 P.W.§ Trust Frwd _ _ _ _ _ 2,450,000 Bond Proceeds- - Others (01411) 2,000,000 500,000 5,600,000 Total Funding Sources: 4,000,000 1,000,000 11,200,000 Exoendhures: Design - - - - 300.000 Right of Way- _ Construction 4.000000 11000.000 - 10,900.000 Total Eypenditure. 4,000000 1000,000 11,2W,000 87 City of Auburn Capital Facilities Plan --CAPITAL FACILMES PLAN ��. F2005-2010 - Project Title: Sanitary Sewer Repair Replacement Program Project No: C228A Project Type: Replacement Improvement Project Manager: Jeff Roscoe Description: Repair and replace failing sanitary sewer, pipe around the is an annual project thatwiltbe broken down into various locations each year. Progress Summary: The City is designing a replacement program for construction in 2005. We will also be looking at the possibility of spot repairs Impact on Operating Budget Once Completed: This project will have no significant impact on the Sewer Division'sratio oPe 9 budget.. - Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate Funding Sources: 2005 Budoet Protect Total Unrestricted Sewer Revenue - 1,350,000 1,825,000 3,175,000 Grants - - _ Bond Proceeds Others Total Funding Sources: 1,350,000 1,825,000 3,175,000 Expenditures:. Design - 100,000 125,000 225,000 Right of Way - _ - Construction - 1,250,000. 1,700,000 2,950,000 Total Expenditure: - 1,350,000 1,825,000 3,175,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: 2005.2010 Unrestricted Sewer Revenue 250.000 250,000 Grants 500,000 1,000.000 250,000 - 4,075,000 Bond Proceeds- ovws .. .. Total Funding Sources: 250,000 250,000 500.000 1,000,000. 250,000 4,075,000 Expenditures: - Des/gn 100,000 50:000 "- Right of Way- _ 25,000 .. 10,000 _ _ 100.000 410,000 _ Construction 150,(00 200,000 475000 990,000 150000 3685,000 Total- diture: 250 000 250,000 500,000 1 000 000 250,000 4,QMOOO m LJ LJ 0 0 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 Project Title: Improvements Project No: 431(a) Project Type: Improvements Project Manager: Jeff Roscoe Description: Capitalization shall be based upon costs associated with enprovements to sewer facilities. Improvements will be primarily directed at pump stations to eliminate odor problems and ensure adequte capacity in the pumps, wet well, and generators. y Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the Sewer Division's operating budget Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiecf Tota! Funding Sources: ' Unrestricted Sewer Revenue 10,000 65,000 117,000 192,000 Grants - - - - Bond Proceeds - - - - Others Total Funding Sources: 10,000 65,000 117,000 192,000 Expenditures: Design 10,000 10,000 12,000 32,000 Right or Way - - - - Construction 55,000 105,000 160,000 Total Expenditure: 10,000 65,000 117,000 192,000 Forecasted Project Cost: - 2006 2007 2008 2009 2010 Tota! Funding Sources: 2005.2010 Unrestricted Sewer Revenue 125,000 125,000 125,000 125,000 125,000 742,000 Grants - - - _ Bond Proceeds Others Total Funding Sources: 125,000 125,000 125,000 125,000 125,000 742,000 Expenditures: - Design 10,000 10,000 10,000 10,000 10,000 62,000 Right of Way - - - - _ _ Construction 115,000 115,000 115,000 115,000 115,000 680000 Total Expenditure. 125,000 125,000 125,000 125,000 125,000 7 000 M City of Auburn Capital Facilities Plan SOLID WASTE Current Facilities The City of Auburn no longer has recycle drop stations facilities. The City now provides curbside service through a vendor who handles the disposal. 0 L_ J i City of Auburn Capital Facilities Plan STORM DRAINAGE Current Facilities The City's storm drainage service area encompasses the municipal boundaries of the City. For management purposes the service area is divided into sixteen drainage sub -basins. The City's drainage system consists of a combination of closed conveyance pipes and open ditch conveyance facilities, with four pumping stations. Table SD -1 Facilities Inventory lists the facilities along with their current capacities and location. Level of Service (LOS) The City's Comprehensive Drainage Plan summarizes the level of service (LOS), or design criteria, for the City's storm drainage system. Generally, these standards represent a 25-year/24-hour design storm capacity within the sixteen drainage sub - basins. Capital Facilities Projects and Financing The City's storm drainage facilities include four categories of projects: (1) developer participation capacity projects ($300,000), which primarily represent developer participation projects to support new development; (2) pipelines and surface conveyance projects ($3,237,000); (3) retention, detention, and water quality non - capacity projects ($1,450,000), which primarily represent detention and retention facilities improvements and upgrades; and (4) comprehensive planning ($300,000). Total six-year costs for the four categories of projects are $5,287,000. Table SD -2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table SD -3 shows, operating budget impacts of $20,000 are forecasted for storm drainage facilities during the six years 2006 — 2011. 91 TABLE SD - 1 City of Aubum Capital Facilities Plan CURRENT FACILITIES INVENTORY STORM DRAINAGE FACILITIES oat acres) 4Facility ipeline _ hat 616 f" .'Locatjo i Sub -Basins' =�=.�z AA 441 6,600 16,000 See City of Aubum A 497 16,000 Comprehensive Drainage B 836 54,000 Plan C 868 49,000 5,700 August 2002 D 176 15,000 500 For Sub -Basin Locations E 505 25,000 15,000 F 83 8,000 G 126 13,000 H 419 24,000 2,000 HV 63 5,000 1 240 9,000 7,000 K 244 6,000 1,000 L 104 3,000 1,000 O 287 6,000 10,000 P 155 4,000 3,000 V 572 10,000 9,000 W 66 7,000 Z 57 7,000 Total 5,739 267,600 70,200 Capacity Facility (gpm) Location Pump Stations "A" Street SE Pump Station #1 5,300 5000 Block "A: Street SE. Pumped drainage outlet to the White River "A" Street SE Pump Station #2 1,380 "A" Street SE near Hwy 18 & Burlington No. Railroad overpass Auburn Way South Pump Station #3 1,000 Auburn Way So. near Hwy 18 & Burlington No. Railroad overpass Brannan Park Pump Station #4 20,200 Brannan Park 0 City of Aubum Capital Facilities Plan 0 TABLE SD - 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DMSION Capacity Projects (Expansions) 1 Developer Participation 432 (18) Cost 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Rev- Storm Fund 50,000 50,000 50,000 50,000 50,000 50,000 300,000 2 21st St SE & R St SE (BC44 Modifted) 432(12)- 32(12)`Cost Cost950,000 - - - - - 950,000 Rev- Storm Fund 950,000 - - - - - 950,000 3 E Basin Ditch improvement 432 (11)' Cost 50,000 50,000 437,000 - - - 537,000 Rev- Storm Fund 50,000 50,000 437,000 - - - 537,000 4 21srSt. BE & M St SE (SC -22 Modified) Cost - - - 75,000 425,000 - 500,000 Rev- Storm Fund - - - 75,000 425,000 500,000 5 Terminal Park Infiltration (BC -24 Modified) Cost - - - - - 75,000 75,000 Rev- Storm Fund - - - - - 75,000 _ 75,000 6 North Central Storm Pond (GHI-9) Cost - - 75,000 75,000 Rev- Storm Fund - - - - - 75,000 75,000 7 Auburn Environmental Park Cost - 20,000 20,000 20,000 20,000 20,000 16o,000 Rev- Storm Fund - 20,000 20,000 20,000 20,000 20,000 100,000 Subtotal 1,050,000 120,000 507,000 145,000 495,000 220,000 2,537,000 1] City of Aubum Capital Facilities Plan 8 Lakeland -Hills Subsurface-fiow improvemeritkuu Cost 50,000 50,000 Rev - Storm Fund 50,000 50,000 9 RegulatoryImprovements Cost 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Rev - Storm Fund 50,000 50,000 50,000 50,000 50,000 50,000 300,000 10 Storm Pond Improvements (C StreetlRiverwalk'Stormnd Improvements) Cost 200,000 200,000 . 200,000 200,000 200,000 200,000 1,200,000 Rev - Storm Fund 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Pipeline Repair& Replacement Cost 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Rev - Storm Fund 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Subtotal 500,000 450,000 450,000 450,000 450,000 450,000 2,7 SUMMARY: COSTS AND REVENUES Capacity Projects 1,050,000 120,000 507,000 145,000 495,000 220,000 2,537,000 Non -Capacity Projects 500,000 450,000 450,000 450,000 450,000 450,000 2,750,000 Total Costs 1,550,000 570,000 957,000 595,000 945,000 670,000 5,287,0001 Rev - Storm Fund BALANCE 1,550,000 570,000 957,000 595,000 945,000 670,000 5,287,0001 M sl 0 i 0 City of Aubum Capital Facilities Plan . 4 CARTALFACILMES, .LAN "- -' =2005-2010 Project Title: Developer Participation Project No: 432 (S) Project Type: Expansion: Capacity Project Manager: Unassigned E i Description: Funding set aside for u4ing Storm lines being installed Iopers.These funds will be expended when developers install storm'6nes according to City code whe r fines are required as predetermined by the Storm Drainage Comprehensive Plan. Progress Summary: _ Impact an Operating Budget Once Completed: The impact of this project cannot be determined until the specific developer projects are identified. Current Year Budget: 2005 YM Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2006 Estimate 2005 Budget Protect Total Funding Sources: Unrestricted Storm Revenue 250,000 - 50,000 300,000 Grants - Bond Proceeds - - - - Others Total Funding Sources: 250,000 50,000 300,000 Expenditures: Design - - - - Right o/ Way - - - Construction 250,000 50,000 300,000 Total Expenditure: 250,000 50,000 300,000 Forecasted Project Cost: 2006 2007 2008 2008 2010' - Total'' Funding sources: 2005-2010 Unrestdded Storm - Revenue 50.000 50,000 50,000 50,000 50.000 900,000 Grants - - - _ - Bond Proceeds - - - - - others Total Funding Sources: 50,000 50,000 50,000 50,000 50.000 900,000 Design - - - - .. Right or Way- - - - ConsUuedon 50.000 50,000 50.000 50,000 50,000 300.0001 Total dMum. 50,000 50,000 50,000 - 50,000 50,000 300 000 95 City of Auburn Capital Facilities Plan x'CAPITALFA{:1L/T/FS PLAN. *,?A05-2010 - Project Title: 21st St. SE & R St. SE (BC -14 Modified) Project No: 432 (12) Project Type: Improvement: Capacity Project Manager: Unassigned Description: Conveyance improvement 21 stSt SE from X SL to R sk d R st SEfrom 21st to 25th St. SE. Modeling will ign be performed during predesto determine if add itionai ca iaavailable in the 21st St SE regional infiltration facility. If this is the case, the project will be a deviation from existing regional facility. ` mprehensive Plan, but take advantage of the Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the Storm Utility operating budget Current Year Budget: 2005 YTD actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2001 Estimate 2005 Budoe[ Proiect Tota! Funding Sources: unrestricted Storm Revenue 20,000 20,000 950.000 990.000 Grants - Bond Proceeds Impact Fees Total Funding Sources: 20,000 20,000 950,000 990,000 Expenditures: Design 20,000 20.000 75,000 115,000 Right o1 Way - - _ _ Construction 875,000 875,000 Total Er nditure: 20,000 20,000 950,000 990,000 Forecasted Project Cost: 2005 2997 2008 2009 2010 Tota Funding Sources: 2005-2010" Unrestricted Storm Revenue _ _ _ _ _ 950 p00 Grants Bond Proceeds h"pact Fees Total Funding Sources: .950.900 Expenditures: Design - - - - - - - 75,000 Right of Noy - on - 875.000 Tota) Erpenditurp. 950.000 0 • City of Auburn Capital Facilities Plan CAPrM FAC1Lff ES PLAN- "" �ao5:zara •x,x , Project Title: E Basin Ditch Improvement Project No: 432 (11) Project Type: Improvement: Capacity Project Manager: Unassigned Description: Capacity improvement tthe eldsing downstream ditchse "Downtown Area'- Project scope to be considered with the Aubum.Environmental Park_ The E Basin Ditch that _ ing considered for improvements runs north from 6th St NW to approximately. 20th St NW to parallel with the Into n Trail Progress Summary: Impact on Operating Budget Once Completed: Based on the 2004 operating budget for the Storm:Division, the annual maintenance cost for this project is estimated to be $2,000. m Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity., - 2004 YE 2005 Year End Prior to T004 Estimate 2005 Budoet Protect Total Funding Sources: Unrestricted Storm Revenue 437,000 20,000 50.000 507,000 Grants - - - Bond Proceeds - - - Impact Fees Total Funding Sources: 437,000 20,000 50,000 507,000 Expenditures: Design 50,000 20.000 50,000 120,000 Right of Way - - - construction 387,000 387,000 Total Ex nditure: 437,000 20,000 50,000 507,000 Forecasted Project Cost: 2000 2007 2008 2009 2010 TOW Funding Sources: 2005.2010 Unrestricted Storm Revenue 50,000 437,000 - - - 537,000 Grants Bond Proceeds impact Fees Total Funding Sources: 50,000 437,000 537,000 ExOendHures: Design 50,000 - - 100,000 Right of Way construction 437,000 - 437,000 TotalExpenditure: 50,000 437,000 537,000 97 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN' 40051-2010— Project Title: 21st St. SE & M St. SE (BC -22 Modified) Project No: 432 (13) Project Type: Expansion: Capacity Project Manager: Unassigned Description: .. Construct infiltration fact at Pioneer Elementary School. Mo cling will be performed during predesign to determine if additional capacity is available in the2lst'St. SE regional in facility. if adequate capacity is available, the project will be revised to a'conveyance line improvement in lie on-site infiltration on school district property. Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the Storm Divisions' operating budget Current Year Budget: 2005 YrDAcfuar Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 _ Estimate 2005 Budge f Prolect Total Wntlin Sources: Unrestricted Storm Revenue - 20,000 - 20,000 Gmms _ Bond Proceeds Im act Fees Total Wndin Sources: 20,000 20,000 Expenditures: Design - 20,000 - 20,000 Right of Way - - - _ construction Total Ex ndltum- 20,000 20,000 Forecasted Project Cost: 2008 2007 2008 2009 2010 Total S= Sources: 2005 - 2010 unreatrlchd storm Revenue - - - 75,000 425,000 - 500,000 Grants Bond Proceeds Total Wntltng lrrr FoesSourc- . es: 75,000 425,000 500,000 Expenditures: Design - - 75,000 - - - 75,000 Right of Way Construction - 425.000 - 425,0001 Tom dfmre: 75 000 42 000 500 000 KJ Ll 0 0 0 City of Auburn Capital Facilities Plan _ CAPJTAL-FAau-nFSP_LAN Project Title: Terminal Park Infiltration (BC -24 Modified) Project No: Project Type: Expansion: Capacity Project Manager: Unassigned Descriptions Capacity improvemeriio construct infiltration at or near 79,ninal Park to reduce localized flooding particularly at Terminal Park Elemeritary School and provide relief to m drainage system. AW Progress Summary: Impact on Operating Budget Once Completed. This project will have no significant impact on'the Storm Utility operating budget = Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: - 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Storm Revenue Grants - - - - Bond Proceeds - - Impact Fees Total Funding Sources: Expenditures: _ Design Right or Way construction Total Expenditure: Forecasted Project Cost: � 2006' 2007 2008 2009 2010 Taal Funding Sources: - 2WSm W10 Unrestricted Storm Revenue - - - - 75,OOO 75,000 Grants - Bond Proceeds -- Impact fees Total Funding Sources:- - - 75,000 00 - 75,0 Expenditures: Design - - - - '75.000 75,000 Right of Way - _ _ _ ConsWedon _ Total ,tura: 75 000 75 000 City of Auburn Capital Facilities Plan x> CAP,ITALFACILMES PLAN Project Title: North Central Storm Pond (GHI-9) Project No: Project Type: Expansion: Capacity Project Manager: Unassigned Description: =� Capacity project to provideftgionat storm water detention at inistiee property. Progress Summary: Impact on Operating Budget Once Completed: This project will have: no significant impact on the Storm Utility operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments - Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Totef Funding Sources, Unrestricted Storm Revenue Grants Bond Proceeds - - Impact Fees Total Funding Sources: Expenditures: Design Right of Way - _ - Construction Total Expenditure: Forecasted Project Cost: 2006 2007 2008 2009 2010 Tota Funding Sources: .2005-1010 Unrestricted Storm Revenue _ - - 75,000 75,000 - Grants Bond Proceeds bripoct Fees - .- ... Total Funding Sources: 75,000 75,000 Expenditures: Design _ _ _ 75.000. 75,000 Right or Way Construetfon _ -TotalExpenditure: 75,000 75,9W 100 Is L� 0 i City of Auburn Capital Facilities Plan CAPITAL AACIU77 S' PLAN -r°�, a' 1•'ZO'DJr-'20:0 ` �. Project Title: Auburn Environmental Park Project No: 432 (15) Project Type: Project Manager: Unassigned Description. The Auburn Environreratat ParkfeasibiCity study funding res that project elements are coordinated with solutions for P and E jdowntown) basins. Progress Summary: Impact on Operatfng Budget Once Completed: This project vAl have no significant impact atthis'time. When the project is complete, impacts will be determined for the Storm Drainage operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budgel Activity: 2004 YE 2005 Year End Prior to 2004 Estimate Funding Sources: 2005 Budoet Project Total Unrestricted Storm Revenue - 20,000 - 20.000 Grants - - Bond Proceeds - Im ct Fees Total Funding Sources: - 20,000 20,000 Expenditures: Design - 20,000 - 20,000 Right or Way - - - _ Construction Total Expenditure: - 20,000 20,000 Forecasted Project Cost: 2008 2007 2008 2009 2010 -Total Funding sources: 2008.2010.. Unrestricted Storm Revenue 20,000 20,000 Grants 20,000 20,000- 20,000 '-- 100,000 Bond ProceedsImpact Fees Total Fundin Sources: 20,000 20,000 20,000 20.000 20A00 100,000 ExoendNures: Design - Right of Way - - Construcdon 20,000 20.Ooo 20.000 20 000 20,000 Tota! Expenditure: 20,000 20,000 20,000 000 20,000 - 100 000 iffyi City of Auburn Capital Facilities Plan ,CAPITAL FACILITIES=PLAN Project Title: Lakeland Hills Subsurface Flow Improvement Project No: Project Type: Improvement: Non -Capacity Project Manager. Unassigned Description.- escription:Improvement Improvementto the existing drainage system to collect #w4&charqe from two local, springs. Currently, the discharge sheet flows- over theepstingsidewalk Progress Summary: Impact on Operating Budget Once Completed: -- - This project will have no significant impact on the Storm Utility operating budget. - . =. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources. Unrestricted Storm Revenue 50,000 50,000 Grants - - - - Bond Proceeds - - Impact Fees Total Funding Sources: 50,000 50,000 Expenditures: Design - - 10,000 10,000 Right of Way - - - - Construction 40,000 40,000 Total Expenditure: 50,000 50,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding Sources: - 2005-2010- 005-2010-Unrestricted Unrestricteddorm Revenue - - - - - "50,000 Grants BondProceeds knpwt Fees Total Funding Sources: 50,000 Expenditures: Design - - - - - .. 10,000 - Right of Way construction - - 40,000 Toter diture: 50,000 102 i 0 Ll City of Auburn Capital Facilities Plan CAP?AL FACILMES'PLAN ` Project Title: Regulatory Improvements Project No: Project Type: Improvement: Non -Capacity Project Manager: Unassigned Description: Comprehensive Piarr`ion or Regulatory responses. Pogress - ` mma v. a on Operating Budget OnceCompleted: - This project vAll have no impact on the Storm UbTi y operating budget. Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity. 2006 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Storm Revenue - 50,000 50.000 Grants - - - _ Bond Proceeds Impact Fees Total Funding Sources: 50,000 50,000 Expenditures: Design - - 50.000 50,000 Right of Way - - _ - Construction Total Expenditure: 50,000 50,000 Forecasted Project Cost: 2005 2007 2008 2009 2010 Total Fundin Sources: 2008-2010 Unrestricted Storm - Revenue 50,000 50.000 50,000 50,000 50.000 300.000 Grants - - _ _ _ Bond Proceeds ImpactFees Total Funding Sources: 50,000 50.000 50.000 50.000 50.000 300,000 Exasndhures: Design 50.000 50,000 50.000 50.000 50.000 -- 300.000 Right of Way construction - Total.Expenditure, 50,000 50,000 50,000 50,000 50,000 300,000 103 City of Aubum Capital Facilities Plan '� -C4PITAL;FACIL MES.PLi4N t 2005.2010 Project Title: Storm Facility Retrofit Program Project No: Various Project Type: Repair/Replacement: Non -Capacity Project Manager: Unassigned Description: *n Annual program to impro and aesthetics of two e ' storm ponds-. Rehabilitate pond and provide new landscaping between (1) C�and Highway 98;'(2) Riverwa in 2004. Two ponds to be identified for 2005 and the following years. Progress-Summary t _ Impact on Operating Budget Once Completed For the first couple years additional costs will be necessary to establish the landscaping. The additional annual cost is estimated to be $2,000: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Buda* f Project Total Funding Sources: Unrestricted Street Revenue - 125,000 200,000 325,000 Grants - _ _ - Bond Proceeds _ _ Impact Fees Total Funding Sources: 125,000 200,000 325,000 Expenditures: Design - 20,000 50,000 70,000 Right of Way Construction 105,000 150,000 255.000 - Total Expenditure: 125,000 200,000 325,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 TOW .:.; Funding Sources: 2005-2010 UnrestrMted Street Revenue 200.000 200,000 200,000. 200,000 200,000 1,200,000 Grants - - Bond Proceeds Impact Fess _ Total Funding Sources: 200,000 200,000 200,000 200,000 200.000 1,200,000 Expenditures: Design,. 50.000 50,000 50,000 -... 50,000 50,000 300,000 -Right of Way... - - . - construction 150,000 150,000 150.000 150,000 150,000 900,000 Total Expenditure, 200 000 200,000 200 000 200,000 ;, 200 000 1 00 000 104 0 0 0 City of Auburn Capital Facilities Plan CAPITAL FAC/LMES PLAN 2005.2010 Project Title: Pipeline Repair/ Replacements Project No: Project Type: Non Capacity Project Manager: Varies Description:,, Projects identifiedto replace existing infrastructure Sup #'W Local Street and other Utility replacement programs requiring coordination. Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the Storm Utility operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End - Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Storm Revenue - 200,000 200,000 Grants - - Bond Proceeds - - - lm act Fees Total Funding Sources: 200,000 200,000 Expenditures: Design 40,000 40.000 Right or Way - - - Construction 160,000 160,000 Total Expenditure: 200,000 200,000 Forecasted Project Cost: 2006 2007 2009 2009 2010 Total Funding Sources: 2005-2010 Unrestricted Storm Revenue 200,000 200,000 200,000 200,000 200,000 1,200,000 Grants - - - - - - - - Bond Proceeds Impact Fees Total Funding Sources: 200,000 200,000 200,000 200,000 200,000 1,200,000 Expenditures: Design 40,000 40,000 40,000 40,000 40,000 240,000 Right of Way - - - - construction 160,000 160,000 160.000 160.000 160,000 9601000 Total Ex ire: 200 000 200,000 200,000 200 000 200,000 1,200,000 105 TABLE SD -3 City of Aubum- Capital Facilities Plan IMPACT ON FUTURE OPERATING BUDGETS STORM DRAINAGE CITY OF AUBURN 1 Developer Participation - - - - 2 21st St. SE & R St. SE - - - - - 3 E Basin Ditch - - 2,000 2,000 2,000 2,000 8,000 Improvement 4 21 st St. SE & M St. SE - - - - 5 Terminal Park Infiltration - - - 6 North Central Storm Pond - - - - - 7 Auburn Environmental - - - - - - Park 8 Lakeland Hills Subsurface - - - - - Flow Imp 9 Regulatory Improvements - - - - - - - 10 Storm Pond Improvements 2,000 2,000 2,000 2,000 2,000 2,000 12,000 11 Pipeline Repair & - - - - - - - Replacement Total 2,000 2,000 4,000 4,000 4,000 4,000 20,000 0 l_J City of Aubum Capital Facilities Plan TRANSPORTATION Current Facilities Roadways: The City's roadway system consists of a network of limited access freeways and 189 miles of arterial, collector, alleys and local streets. Table T-1 "Facilities Inventory" lists the inventory of state operated and maintained freeways, city arterial road segments, and signalized intersections. Table T-1 also includes the most current volume/capacity ratio and Level of Service (LOS) of each arterial roadway segment and the most current LOS of each signalized and unsignalized intersection. Transit: Metro and Sound Transit provide transit service to the Auburn area. There are currently (2002) eleven routes providing transit linkages in Auburn. Three park and ride facilities, with 1,038 parking spaces, also serve Auburn. Level of Service (LOS) Washington's Growth Management Act (GMA) requires service level standards for both arterials and transit routes. The GMA requires that each jurisdiction's Level of Service (LOS) standards be coordinated within the region and be supported by local ordinance, but the standards and the methods used are up to the local jurisdictions. Under GMA, the focus is on the performance of the whole road system, not on individual intersections or roadways. Level of service standards is a tool to help keep the transportation system in balance with the needs of future population growth and development. A methodology and set of standards have been drafted for the City of Auburn Comprehensive Plan. The standards help determine concurrency (i.e., balance) between. transportation and land use elements of the City's Comprehensive Plan, as required by GMA. The City has four choices if it finds the standards cannot be met. • Modify the land use plan, placing tighter controls on the amount and type of development to minimize traffic. • Construct additional transportation facilities to support increased travel demand from new development. • Transportation Demand Management (TDM) measures. • Relax the LOS standards. The City can accept lower levels of service to encourage further growth and minimize the need for additional transportation facilities. 107 City of Auburn Capital Facilities Plan The Transportation Land Use Balance will be monitored through the City's Concurrency Management System as part of SEPA. Transportation concurrency will be evaluated for key facilities and on a system -wide basis. By having system- wide and facility -based roadway LOS standards, the City of Auburn can define preliminary capacity needs. The City and WSDOT can then begin to plan corridor studies that will define the characteristics and location of a particular roadway improvement. At the project level, the State Environmental Policy Act (SEPA) process will continue to guide the more specific planning and analysis efforts. Uses of Level of Service Standards As measures of transportation system effectiveness, level of service standards can help jurisdictions identify where and when transportation improvements are needed, and when development or growth will affect system operation. Level of service provides a standard below which a transportation facility or system is not considered adequate. Level of service standards can be used to evaluate the impact of proposed developments on the surrounding road system. They can assure that all developments are served by a safe, efficient and cost-effective road system. They can also be used to identify problems, suggest remedial actions, and apportion costs between public and private sources. LOS standards are a cornerstone in the development of equitable traffic impact fee systems, which makes development pay some of the costs for improvements to the transportation infrastructure. In July 2001 the City implemented a traffic impact fee. The purpose of the fee is to mitigate traffic impacts more equitably while making the costs of development more predictable to developers. Measuring Transportation System Performance Arterial Corridor Link Level. The level of service for roadway segments or links is analyzed with two primary purposes in mind. First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate areas of congestion within a transportation network --leading to the development of a long-range transportation facilities plan. Traffic forecasts from the model will be analyzed to determine where capacity improvements should be considered. Second, arterial corridor LOS analysis is used to assess concurrency or if facilities are meeting the LOS standards. The City of Auburn uses traditional engineering methodology to assess arterial corridor LOS. Roadway travel volumes are compared to roadway capacity to develop a ratio known as volume -to -capacity (V/C). The volume -to -capacity ratios 108 i City of Auburn Capital Facilities Plan relate directly to measures of level of service. Table T -2A shows the relationships between LOS, V/C ratios, peak hour, and free flow speed on an arterial. Table T -2A. V/C Ratio Ranges As They Relate To LOS _. � �LOS ' . Volume #o ca c . _ .: _ paoft .-, (ratio range),, . imi- Percent of freevflow speed ; - (peak hour) A .50 and below 90% or greater B .60 to .69 70% to 90% C .70 to .79 50% D .80 to .89 40% E .90 to .99 33% F 1.00 and above 25% or less There are six levels of service on a scale -of A to F. LOS A represents the best operating conditions, and LOS F the worst. The characteristics of the six levels of service are summarized in Table T-2B. Table T-2B. Definition of Arterial Levels of Service Level of Service A—describes primarily free flow operations at average travel speeds, usually about 90 percent of the free flow speed for the arterial class. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Stopped delay at signalized intersections is minimal. Level of Service B --represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free flow speed for the arterial class. The ability to maneuver within the traffic stream is only slightly restricted and stopped delays are not bothersome. Drivers are not generally subjected to appreciable tension. Level of Service C --represents stable conditions; however, ability to maneuver and change lanes in mid block location may be more restricted than in LOS B, and longer queues and/or adverse signal coordination may contribute to lower average travel speeds of about 50 percent of the average free flow speed for the arterial class. Motorists will experience tension while driving. Level of Service D --borders on a range in which small increases in flow may cause substantial increases in approach delay and, hence, decreases in arterial speed. This may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free flow speed. Level of Service E --characterized by significant approach delays and average travel speeds of one-third the free flow speed or lower. Such operations are caused by some combination of adverse progression, high signal density, extensive queuing at critical intersections, and inappropriate signal timing. Level of Service F --characterizes arterial flow at extremely low speeds below one-third to one- quarter of the free flow speed. Intersection congestion is likely at critical signalized locations, with resultant high approach delays. Adverse progression is frequently a contributor to this condition. Source: 1985 Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington, D.C. 1985, page 11-4 0M•. City of Aubum Capital Facilities Plan The LOS scale has been adopted by the Institute of Transportation Engineers, the . Transportation Research Board, and by most jurisdictions throughout the country. The scale is also accepted and generally understood by the public and elected officials. Level Of Service Standards For Capacity And Congestion. The LOS standards shown in Table T -2C apply to the facility's location and its functional classification. Specific details of the level of service methodology are provided in the City of Auburn Transportation Plan (1997). Table T -2C. Draft Roadway Capacity/Congestion LOS Standards Roadw /Intersectiorr }• axlmurnWC Ratio/LOS=',, Arterial Corridor (Capacity) "D" for each arterial link, except for collector residential arterials, which is "C" Signalized Intersection "D" Unsignalized Intersection "D" Relationship to Concurrency Management. Concurrency involves matching public facilities and new development. The GMA extends concurrency to transportation facilities by requiring that new development be served by adequate roads and public in transportation service, and that development is not permitted to cause these transportation facilities to operate below level of service standards that are adopted by local governments in their comprehensive plans. Capital Facilities Projects and Financing The City's transportation facilities include projects totaling $82,633,500. Table T-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table T-3 shows, operating budget impacts of $405,307 are forecasted for transportation facilities during the six years 2006 — 2011. Concurrency (Adequate Public Facilities) In compliance with the GMA, adequate transportation system facilities must be available within six (6) years of the time of occupancy and use of new development. RIO] City of Auburn Capital Facilities Plan TABLE T-1 FACILITIES INVENTORY TRANSPORTATION 111 Classified Street Segments — Arterials (9/20/02) route from to LOS 003rd St NE/NW Auburn Ave C St NW D 003rd St SE A St SE SRI WB ramps D 004th St SE Auburn Way South F St SE C 004th St SE _ F St SE M St SE B 008th St NE 009th St NE Harvey Rd D 008th St NE 104th Ave SE ;.; R St NE F 008th St NE Harvey Rd Pike St E 008th St NE Pike St R St NE E 009th St NE 008th St NE Auburn Way North B 009th St NE Auburn Way North D St NE B 012th St SE A St SE F St SE C 012th St SE Auburn Way South F St SE E 012th St SE Auburn Way South M St SE D 014th St NW A St NE B St NW C 015th St NE A St NE D St NE C 015th St NE Auburn Way North D St NE E 015th St NW AStNE CStNW C 015th St NW C St NW SR167 NB ramp D • 015th St NW R St NW W. Valley Highway B 015th St NW SR167 NB ramp SR167 SB ramp F 015th St NW SR167 SB ramp W. Valley Highway D 015th St SW Boundary Blvd C St SW D 015th St SW Boundary Blvd O St SW D 015th St SW O St SW SR167 NB ramp C 015th St SW SR167 NB ramp SR167 SB ramp D 015th St SW SR167 SB ramp W. Volley Highway F 016th St NW AStNE BStNW B 017th St SE A St SE F St SE D 017th St SE Auburn Way South F St SE C 017th St SE Auburn Way South R St SE F 029th St SE A St SE F St SE C 029th St SE F St SE M St SE B 029th St SE M St SE R St SE D 037th St NE Auburn Way North I St NE D 037Th St NW Auburn Way North B St NW E 037Th St NW B St NW W. Valley Highway D 041stStSE AStSE CStSW F 047th St SE Lakeland Hills Way Mill Pond Dr B 053rd St S Bridget Ave SE Kersey Way N/A' 055th Ave SE Bridget Ave SE Jordan Ave SE N/A" A St NE 014th St NE 015th St NE C A St NE 015th St NE 016th St NE C 111 City of Aubum Capital Facilities Plan Classified Street Segments - Arterials (9/20/02) A St SE 002nd St SE 003rd St SE E A St SE 002nd St SE E Main St D A St SE 003rd St SE 006th St SE D A St SE 006th St SE 012th ST SE B A St SE 008th St E City Limits E A St SE 008th St E Lakeland Hills Way E A St SE 012th St SE 017th St SE D A St SE 017th St SE 021 st St SE D A St SE 021 st St SE 029th St SE D A St SE 029th St SE _ 037th St SE C A St SE 037th St SE 041 st St SE F A St SE 041st St SE Lakeland Hills Way E A St SW 002nd St SW 003rd St SW B A St SW 002nd St SW E Main St C Auburn Ave 001st St NE 003rd St NE E Auburn Ave 001st St NE E Main St F Auburn Ave 003rd St NE 004th St NE F Auburn Ave 004th St NE Auburn Way North E Auburn Black Diamond Rd R St SE City Limits B Auburn Way North 001st St NE Auburn Ave D Auburn Way North 001st St NE E Main St E Auburn Way North 009th St NE 0151h St NE D Auburn Way North 0091h St NE Auburn Ave C Auburn Way North 015th St NE 022nd St NE C Auburn Way North 022nd St NE 030th St NE/NW D Auburn Way North 030th St NE/NW 037th St NE/NW D Auburn Way North 0371h St NE/NW S 277th St D Auburn Way South 002nd St SE 004th St SE D Auburn Way South 002nd St SE E Main St C Auburn Way South 004th St SE SRI 8 WB ramps F Auburn Way South 012th ST SE F St SE E Auburn Way South 012th St SE M St SE F Auburn Way South 032nd St SE Academy Dr F Auburn Way South 032nd St SE Hemlock St SE F Auburn Way South Academy Dr S 368th PI F Auburn Way South Dogwood St SE Hemlock St SE F Auburn Way South Dogwood St SE Riverwalk Dr F Auburn Way South F St SE SR 18 EB ramps E Auburn Way South M ST SE Riverwalk Dr D Auburn Way South SRI EB ramps SR 18 WB ramps F B St NW 0141h St NW 0151h St NW A BStNW 015th St NW 016th St NW A B St NW 016th St NW 030th St NW A B St NW 0301h St NW 037th St NW D B St NW 037th St NW 049th St NW E Boundary Blvd 015th St SW O St SW A Bridget Ave SE 053rd St S 055th Ave SE N/A' 112 City ofAubum Capital Facilities Plan 113 Classified Street Segments — Arterials (9/20/02) C St NW 003rd St NW 006th St NW C C St NW 003rd St NW W Main St C C St NW 006th St NW 015th St NW C C St NW 015th St NW Emerald Downs Dr D C St SW 015th -St SW Ellingson Rd C C St SW 015th St SW SR18 EB ramps D C St SW SRI EB ramps SRI WB ramps D C St SW SR18 WB ramps W Main St C Cross St A St SE Auburn Way South C D St NE 010th St NE 015th St NE B D St NW S 277th St S 285th St N/A' E Main St Auburn Ave Auburn Way N/S E E Main St Auburn Ave Division St E E Main St Auburn Way N/S F St SE C E Main St F St SE M St NE/SE C E Main St M St NE/SE R St NE/SE D Harvey Rd 008th St NE I St NE F Harvey Rd Auburn Way North I St NE F I St NE 014th St NE 022nd St NE A I St NE 014th St NE Harvey Rd E I St NE 022nd St NE 030th St NE B I St NE 030th St NE 031st St NE A I St NE 037th St NE 040th St NE A 1 St NE 037th St NE CAMWEST Dev A Lake Tapps Parkway E East Valley Highway Lakeland Hills Way A Lake Tapps Parkway E Lakeland Hills Way City Limits A Lakeland Hills Way 047th St SE Mill Pond Dr C Lakeland Hills Way 047th St SE Oravetz Rd C Lakeland Hills Way A St SE Oravetz Rd E Lakeland Hills Way Evergreen Way SE Lake Tapps Pkwy E C Lakeland Hills Way Evergreen Way SE Mill Pond Dr C M St NE 004th St NE 008th St NE E M St NE 004th St SE E Main St C M St SE 004th St SE 012th St SE D M St SE 004th St SE E Main St D M St SE 012th St SE Auburn Way South F M St SE 021 s' St SE 029th St SE C M St SE 021s' 5t SE Auburn Way South F O St SW 015th St SW Boundary Blvd C Oravetz Rd Kersey Way Mill Pond Dr C Oravetz Rd Lakeland Hills Way Mill Pond Dr F Peasley Canyon Rd West Valley Highway City Limits F R St SE 017th St SE 021 st St SE F R St SE 021 s' St SE 029th St SE E R St SE 029th St SE Oravetz Rd E R St SE 053rd St S Oravetz Rd B R St SE Auburn Black Diamond Rd E Main St C 113 City of Auburn Capital Facilities Plan Classified Street Segments — Arterials (9/20/02) Riverwalk Dr Auburn Way South Howard Rd B Riverwalk Dr R St SE C S 277th St Auburn Way North B St NW F S 277th St Auburn Way North City Limits D S 277th St B St NW D St NW D S 277th St D St NW _ Frontage Rd C S 316th St S 55th Ave W St NW B Terrace Dr R St NW W St NW _: B W Main St A St NW/SW B St NW/SW D W Main St A St NW/SW Division St E W Main St B St NW/SW C St NW/SW D W Main St C St NW/SW H St NW C W Main St H St NW W. Valley Highway B West Valley Highway 015th St NW 037th St NW C West Valley Highway 015th St NW W Main St B West Valley Highway 015th St SW Ellingson Rd F West Valley Highway 015th St SW Peasley Canyon Rd F West Valley Highway 037th St NW S 287th St F West Valley Highway Peasley Canyon Rd SR18 EB ramps F West Valley Highway SR18 EB ramps SR18 WB ramps F West Valley Highway SR18 WB ramps W Main St F N/A' = not analyzed 0 i 114 City of Auburn Capital Facilities Plan 115 Classed Street Segments — Collectors (9/20/02) route from to LOS 001st St NE Auburn Ave Auburn Way North C OOlst St NW Auburn Ave Division St C 001st St NW B St NW Division St C 002nd St SE A St SE Auburn Way South D 002nd St SE A St SE Division St F 002nd St SE Auburn Way South F St SE C 002nd St SE F St SE L St SE B 002nd St SW A St SW Division St D 004th St NE Auburn Ave Auburn Way North F 004th St NE Auburn Way North M St NE C 006th St NW C St NW H St NW C 014th St NE I St NE M St NE B 014th St NE I St NE Riverview Dr A 016th St NE D St NE E St NE B 021 st St SE A St SE F St SE C 021 st St SE F St SE M St SE C 021 st St SE M St NE R St SE D 022nd St NE Auburn Way North E St NE C 022nd St NE Auburn Way North I St NE D 022nd St NE I St NE M St NE B 022nd St NE M St NE Riverview Dr B 030th St NE 030th St NW Auburn Way North Auburn Way North I St NE B St NW D C 032nd St SE Academy Dr Auburn Way South E 037th St NW West Valley Highway City Limits F 037th St SE A St SE M St SE N/A 105th PI SE 107th PI SE Lea Hill Rd F 107th PI SE 105th PI SE SE 320th St C Academy Dr 032nd St SE Auburn Way South C B St NW 001st St NW W Main St D D St NE 015th St NE 016th St NE B Dogwood St SE Auburn Way South Forest Ridge Dr N/A Dogwood St SE Auburn Way South Scenic Dr N/A E St NE 016th St NE 022nd St NE B F St SE 002nd St SE 004th St SE C F St SE 002nd St SE E Main St C F St SE 004th St SE Auburn Way South D F St SE 012th St SE 017th St SE B F St SE 017th St SE 021 st St SE B F St SE 021st St SE 029th St SE C Green River Rd 104th Ave SE City Limits A H St NW 006th St NW W Main St C M St NE 014th St NE 022nd St NE B M St SE 029th St SE 037th St SE B Mill Pond Dr 047th St SE Lakeland Hills Way B 115 0 116 City of Auburn -Capital Facilities Plan __ m ?;�InasifiedS}�eet3egmerrts-:,�oAectors=(91�1D2)„��= route from to LOS Mill Pond Dr 047th St SE Oravetz Rd D Mountain View Dr W Main St City Limits B Pike St 008th St NE 014th St NE N/A R St NE 008th St NE E Main St E Riverview Dr 014th St NE 022nd St NE A SE 320th St 107th PI SE City Limits C SE 304th Way Green River Rd SE 304th St A 0 116 0 0 City of Auburn Capital Facilities Plan `•. :. � '"`.��'� a"=�'�' 1.-.�«�=r a;may w"`�• •� # ` �` Ifze�rderseeffdnsY4%2a/021` x 117 NIS Street E/W Street AM OS PM LOS YEAR CONST YEAR COUNT 1 A Street NE 15th Street NE C 1988 2001 2 A Street SE 2nd Street SE C 1979 2001 3 A Street SE 3rd Street SE/ Cross Street C 1968 2001 4 A Street SE 6th Street SE B 1994 2000 5 A Street SE 17th Street SE 1997 1999 6 A Street SE 29th Street SE 1997 1991 7 A Street SE 41 st Street SE F 1979 2002 8 Auburn Ave 4th Street NE B 1977 2002 9 Auburn Ave 3rd Street NE B 1977 2002 10 Auburn Ave 1 st S-treet NE B 1971 1999 11 Auburn Ave East Main Street C 1968 2001 12 Auburn Way N S 277th Street D 2002 2000 13 Auburn Way N 37th Street NE C 1984 2000 14 Auburn Way N 30th Street NE D 1985 2000 15 Auburn Way N 22nd Street NE C 1982 2000 16 Auburn Way N 15th Street NE F 1988 2000 17 Auburn Way N 8th Street NE F 1990 2002 18 Auburn Way N 4th Street NE C 1979 2002 19 Auburn Way N 1st Street NE A 1968 1999 20 Auburn Way East Main Street B 1977 2000 21 Auburn Way S Academy Drive B 1991 2002 22 Auburn Way S Dogwood Street C 1987 2002 23 Auburn Way S Riverwalk Drive E 1995 2002 24 Auburn Way S M Street SE E 1992 2002 25 Auburn Way S 12th Street SE C B 1972 2002 26 Auburn Way S 2nd Street SE B 1979 1999 27 Auburn Way S 4th Street NE C 1993 2000 28 C Street NW West Main Street B 2002 2001 29 C Street NW 115th Street NW C 1995 2001 30 C Street NW 3rd Street NW B ? 2002 117 City of Aubum Capital Facilities Plan µ , Sigrroliiednterseaftoru i4120i021 31 C Street SW 15th Street SW B 1975 2001 32 C Street SW Boeing Gate A-10 A 1979 N/A 33 C Street SW Ellingson Road F 1991 2002 34 D Street NE 15th Street NE B 1985 2001 35 D Street NW S 277th Street B 2002 N/A 36 Division Street West Main Street B 1968 2001 37 Harvey Road NE 8th Street NE F 1988 2000 38 Harvey Road NE I Street NE B 1988 1999 39 Industry Road 15th Street.SW B 1994 2001 40 O Street SW 15th Street SW B 1994 2000 41 Market Street 15th Street SW B 1994 1999 42 Perimeter Road SW 15th Street SW A ? 1999 43 M Street NE 4th Street NE B 1978 1999 44 M Street SE East Main Street D C 1977 2002 45 M Street SE 4th Street SE C 1978 2002 46 Auburn Way S Pedestrian Signal N. of 12th St. SE ? N/A 47 A Street SW West Main Street 2000 N/A 48 A Street SW 2nd Street SW 2001 N/A 49 D Street NE 10th Street NE/ 9th Street NE 1999 2000 50 D Street NE Firestation ? N/A 51 C Street SW 8th Street SW 1998 1999 52 West Valley Highway 37th Street NW C 1995 2001 53 West Valley Hiqhway 15th Street NW D 1988 2001 54 West Valley Highway West Main Street B 1968 2001 55 West Valley HighwayHighwoy 15th Street SW B 1994 2001 56 B Street NW S 277th Street 2002 2000 57 B Street NW 37th Street NW 1995 1999 58 Emerald Downs Drive 37th Street NW 1996 N/A 59 Division Street 3rd Street S 2002 N/A 60 R Street SE 29th Street SE/ Riverwalk 1998 1999 61 R Street SE 31st Street SE Pedestrian Signal) ? N/A 62 R Street SE Firestation 1985 N/A 118 0 9 0 0 City of AUbUM Capital Facilities Plan TABLE T - 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING '- TRANSPORTATION 2006 2007 1 C1006: 3rd Street SFJ -'Cross Street SE -S. Divisioirto Auburn Way South C207A: 'A' Street NW - 3rd Street NW to 14th Street NW Cost 1,138,700 - - - - - 1,138,700 Unrestricted Street Revenue 148,700 - - - - 148,700 Rev - Grant 826,800 - - - - - 826,800 Rev -Reet2 123,100 - - _ - - 123,100 Rev -Impact Fees 40,100 - - 735,000 - - 40,100 2 0222A: S 277th -AWN to Green ithrer Bridge 'Ilk" - - 275,000 110,000 Cost 5,000, - - 325,000 300,000 2,130,900 2,760.900 Unrestricted Street Revenue 5,000 - - 25,000 - - 30,000 Rev - Impact Fees - - - - - 37,700 37,700 Rev - Developer Contribution - - - 200,000 100,000 250,000 550,000 Rev - Grant - - - 100,000 200,000 1,843,200 2,143,200 3 C207A: 'A' Street NW - 3rd Street NW to 14th Street NW Cost 10,000 1,088,000 920,000 2,000,000 3,418,000 - 7,436,000 Unrestricted Street Revenune - 75,000 - 200,000 342,000 - 617,000 Rev - Grant - 738,000 735,000 1,600,000 2,734,000 - 5,807,000 Rev - Other - 275,000 110,000 - 342,000 - 727,000 Rev - Impact Fees 10,000 - 75,000 200,000 - - 285,000 4 C201A: 'M' Street SE - BNSF grade separation - - Cost 5,000 295,000 5.000,000 7,928,600 7,000,000 4,172.000 24,400,600 Unrestricted Street Revenue - 21,000 - - 490,000 - 511,000 Rev- Grant - 240,000 4,200,000 7,362,600 4,070,000 - 15,872,600 Rev - Impact Fees 5,000 34,000 - 100,000 - - 139,000 Rev- Other - - 800,000 466,000 2,440,000 4,172,000 7,878,000 5 C326A: C St SW Ellingson Road to 15th St SW Cost 2,726,000 - - - - - 2,726,000 Unrestricted Street Revenue 400,000 - - - - - 400,000 Traffic Impact Fees 200,000 - _ _ 200,000 Rev - Grant 1,376,000 - - - - - 1,376,000 Rev - Developer 750,000 - - - - _ 750,000 6 C415A: '11' Street NE Corridor -. .... ' .. Cost 40,000 460,000 1,020,000 4,280.000 - 5,800,000 Unrestricted Street Revenue 40,000 - - - - 40,000 Rev - Other - 460,000 1,020,000 4,280,000 - - 5,760,000 Rev -Impact Fees - - - - _ 7 PR529F: 'A' Strut Loop Cost 389,800 - - - - - 389,800 Unrestricted Street Revenue 134,900 - - _ _ _ 134,900 Rev - Grant 254,900 - _ _ _ _ 254.900 8 C307A Citywide ITS Project Cost 1,378,000 1,472,000 - - - - 2,850,000 Unrestricted Street Revenue 64,000 44,000 - - - - 108,000 Rev - Grant 689,000 1,428,000 - - - - 2,117,000 Rev - Muckleshoot Indian Tribe 125,000 - _ _ _ - 125,000 Rev- King County 500,000 500,000 119 City of Aubum Capital Facilities Plan V LAIIA K"pen ncaaemy urns - 10,400,000 8,996,000 Cost - - 550,000 850,000 3,000,000 6,000,000 1,400.000 Unrestricted Street Revenue 1,038,000 362,000 Rev - Grant - 475,750 735,250 2,595,000 5,190,000 Rev - Other - - 74,250 114,750 405,000 810,000 Impact Fees - - - - - - 10 (YYeat Main StreeYto3rd 36ae2 NYV) -. AStreet NW, Phase 2_ _..._. _.....,. �� _ .. .... Cost - - - - 200,000 1,200,000 Rev - Grant - - - - 1,038,000 Rev - Impact Fees - - - 200,000 162.000 11 CStreet NW (Main Streetfo3rd Street NW). •"' - - - ' Cost - - 22,000 508,000 - - Unrestricted Street Revenue - - 22,000 108,000 - - Rev - Grant - - - 400,000 - - Rev - Impact Fees 12 D Street NW (37th Street NW to 44th Street N W) - Cost 200,000 1,500,000 Unrestricted Street Revenue - - - - - 300,000 Rev - Grant - - 160,000 1,200,000 Rev - Impact Fees - - - - 40,000 - 1-3 - F Street SE (4th Street SE to Auburn Way South) Cost - 200,000 650.000 11000,000 Unrestricted Street Revenue - - - - 200,000 - - Rev - Grant - 160,000 520,000 800,000 - - Rev - Impact Fees - 40,000 130,000 - - - 1,14 M Street NE (E MainStreet to 8th Street NE) - - - Cost - - 166,000 805,000 1,000,000 Unrestricted Street Revenue - - 33,200 161,000 200,000 Rev - Grant - - - 132,800 644,000 800,000 15 Realign SR -18 EB Ramp at AWS, Grade Separate BNSF Yard Cost Rev - Other' 16 Harvey and 8th Street NE Intersection Improvements Cost - - 160,000 Unrestricted Street Revenue - - - Rev - Impact Fees - - 160,000 530,000 130,000 400,000 1,700,000 300,000 1,360,000 40,000 1,850,000 200,000 1,480,000 170,000 1,971,000 394,200 1,576,800 r-_ °1,000,000 1,000,000 - 1,000,000 1,000,000 350,000 - - 510,000 339,000 - - 339,000 11,000 - - 171,000 Subtotal 5,692,500 3,515,000 8,322,000 17,407,600 14,923,000 17,002,900 66,863,0001 0 120 - 10,400,000 8,996,000 1,404,000 1,400.000 1,038,000 362,000 530,000 130,000 400,000 1,700,000 300,000 1,360,000 40,000 1,850,000 200,000 1,480,000 170,000 1,971,000 394,200 1,576,800 r-_ °1,000,000 1,000,000 - 1,000,000 1,000,000 350,000 - - 510,000 339,000 - - 339,000 11,000 - - 171,000 Subtotal 5,692,500 3,515,000 8,322,000 17,407,600 14,923,000 17,002,900 66,863,0001 0 120 i City of Aubum Capital Facilities Plan COSTS/REVENUES 17 C205A: Kersey WayAraystz Road Signal Unrestricted Street Revenue 22,000 87,500 - - - - 109.500 Rev - Grant 140,300 561,400 - - 701,700 Rev - Other - - - - - Cost 174,000 _ Cost 537,200 - - - - - 537.200 Unrestricted Street Revenue - 174,000 Rev- Grant 403.200 - - - Unrestricted Street Revenue 174,000 - - - - - 174,000 - - 895.000 Rev - Grant - - - - 709,500 - - - 185,500 Rev - Impact Fees - 18 :.C219A:-:Lea'HUI Slide SlopaH05th-:Strait Repaia:. Cost 100,000 - - - - 100,000 Unrestricted Street Revenue 100,000 - - - - - 100,000 19 =C410A: S277th - AWN to Frontage Rd. Wetland Mitigation - -> Cost 6,000 6,000 6,000 6,000 6,000 6,000 36,000 Unrestricted Street Revenue 6,000 6,000 6,000 6.000 6,000 6,000 36,000 20, C315A Downtown Lighting Program Cost 72,800 - - - - - 72,800 Unrestricted Street Revenue 72,800 - - - - - 72,800 21 C229A: BNSF/East Valley Hwy Pedestrian Underpass Cost 300,000 1,500,000 1,500,000 - - 3,300,000 Unrestricted Street Revenue - - 50,000 50,000 - - 100,000 Rev - Grant 300,000 1,200,000 1,200,000" - 2,700,000 Rev - King Co. Open Space Bd - - - - _ - Rev - Other - 250,000 250,000 - - 500,000 22 : Annual Arterial Pavement Preservation Cost 500,000 500,000 500,000 500,000 500,000 500,000 3,000.000 FEET 500,000 500,000 500,000 500,000 500.000 500,000 3,000,000 23 CitywidePedestrian Crossing Program Cost 50,000 20,000 20,000 20,000 20,000 20,000 150,000 Unrestricted Street Revenue 50,000 20,000 20,000 20,000 20,000 20,000 150,000 24 Citywide Roadway Safety Infrastucture Improvements Cost - 100,000 100,000 100,000 100,000 100,000 500,000 Unrestricted Street Revenue - 100,000 100,000 100,000 100,000 100,000 500,000 25 C322A: West Main Street Streetscape Cost 162,300 648,900 - - - 811,200 Unrestricted Street Revenue 22,000 87,500 - - - - 109.500 Rev - Grant 140,300 561,400 - - 701,700 Rev - Other - - - - - 26 C302B West Valley Hwy Pedestrian Facilities _ Cost 537,200 - - - - - 537.200 Unrestricted Street Revenue - Rev- Grant 403.200 - - - - - 403,200 Rev - Other 134.000 - - - - - 134,000 27 C1014: Auburn Way South Safety Improvements Cost 895.000 - - - - - 895.000 Unrestricted Street Revenue 709,500 - - - - - 709,500 Rev - Grant 185,500 - - - - - 185,500 Rev - Impact Fees - 121 City of Aubum Capital Facilities Plan COSTSIREVENUES 2005 2006 2007 - 2008 2009 2010 TOTAL 28 'M St:SE(37th/ 29th) Design Study Cost - - - - Unrestricted Street Revenue - Bond Proceeds - - - - - - Impact Fees - - - - - - - 29 AubumgWAfkTrail (C Street.SW) .n Cost - 395,900 - - - - 395,900 Unrestricted Street Revenue - 32,000 - - - - 32,000 City of Pacific 22.000 - - - 22,000 Rev - Grant - 341,900 - - - - 341,900 30_. Urban Area TSM Improvements •,- _-. -.--,. u �.., Cost - 661,000 - - - - 661.000 Unrestricted Street Revenue - 6,800 - - - - 6,800 Rev - Grant - 554,200 - - - 554,200 King County Metro - 100,000 - - - 100,000 Impact Fees - 31- `: White River Trail Extension .. _..... Cost Unrestricted Street Revenue . - Rev - Grant - 32 Auburn Black Diamond Non Motorized Class 1 Trail Cost 35,000 Unrestricted Street Revenue 35,000 33 C409k Auburn Way Corridor Pedestrian Study Cost 50,000 Unrestricted Street Revenue - Grants - Rev - Other 50,000 Impact Fees - 34 Green River Trail, Phase 1 Cost - Unrestricted Street Revenue - Rev - Grant - 35 Green River Trail, Phase 2 Cost - Rev - Grant - Rev - Other' 201,400 27,200 174,200 125,000 495,000 125,000 495,000 122 201,400 27,200 174,200 35,000 35,000 50,000 50,000 620,000 620,000 150,000 480,000 630,000 120,000 330,000 450,000 30,000 150,000 180.000 401 0 1] City of Aubum Capital Facilities Plan Green River Tran, rnass 3 Cost _ _ _ _ _ 30,000 30,000 Rev - Grant - - _ _ _ _ Rev - Other' - - - - - 30,000 30,000 37 A Street SE -Class 2 (Transit Center to Ellingson along BNSF) _ Cost 75,000 Rev - Other75,000 38 A Street BE Pedestrian improvement Unrestricted Street Revenue 2,001,900 Rev - KC Open Space Bond Cost - - - 193,000 - Rev - Other' Unrestricted Street Revenue - - - 43,000 - Rev- REET Rev - Grant - - - 150,000 - 39 Kersey Way Troll. '.,_ °. ..:. 500,000 _.. 311.000 Cost 40,000 199.700 1.444.800 Unrestricted Street Revenue 40,000 Rev - Other' _ _ 40 15th Street SW Reconstruction (C Street SW to UPRR) Cost 450,000 2,250,000 Unrestricted Street Revenue - - _ _ Rev - Other' - 90,000 450,000 - - Rev - Grant - 360,000 11800,000 - - 417 Street SEER' Street Connector _ ,.. ., - - Cost _. 63,000 - Rev - Other' - - 12,600 - Rev - Grant - - 50,400 - - 42 Temporary Re -Open of Academy Drive PHASE 1 - Cost - 500,000 - Rev - Other' - 50,000 - - Rev - Grant - 450,000 - - Subtotal 2,622,300 3,581,800 4,564,000 3,090,400 SUMMARY: COSTS AND REVENUES COSTS: Capacity Projects Non -Capacity Projects Total Costs - 75,000 - 75,000 - 193,000 - 43,000 - 150,000 40,000 - 40,000 . -. 2,700,000 540,000 - 2,160,000 63,000 12,600 50,400 500,000 50,000 450,000 776,000 1,136,000 15,770,500 1 5,692,500 3,515,000 8,322,000 17,407,600 14,923,000 17,002,900 66,863,000 1 REVENUES: 1,119,000 Unrestricted Street Revenue 2,001,900 Rev - KC Open Space Bond - Rev - Developer 750,000 Rev - Other' 809,000 Rev - Grants 3,875,700 Rev- REET 623,100 Rev -Impact Fees 255,100 Total Revenues 8,314,800 ' Mitigation agreements, Other agencies 392,300 198,000 997,000 2,716,850 5,133,500 9,106,150 500,000 500,000 74,000 365,000 7,096,800 12,886,000 123 1,151,400 1,119,000 626,000 5,488,600 200,000 100,000 250,000 1,300,000 5,185,750 3,217,000 6,162,000 19,087,600 13,149,850 10,523,000 10,401,200 52,189,400 500,000 500,000 500,000 3,123,100 311.000 240.000 199.700 1.444.800 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN 2005-2010 Project Title: 3rd Street SE I Cross Street SE Project No: C1006 Project Type: Capacity Project Manager: Jennifer Dvorak Description: Widen 3rd Street SE/Cross Street fiom 3 to 5 lanes at'N Street to Aubul , Vey South, Add a second from northbound'A Street to westbound.3rd Street SE. `The projectigdudessignal modifications. left tum lane Installa 12 inch ductile iron water pipe from'A' Street SE to Auburn Way So. The projectile a continuation of the corridor enhanced by the 3r St. SW Grade Separation project. It will improve mobility and is consistent with the Comprehensive Plan. Progress Summary: Property Acquisition and Design are being completed in 2004_Construction is scheduled for 2005. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $1,757. v4. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments ' Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budvet Proiect Tore! Cost Funding Sources: Unrestricted Street Revenue 9,973 55,000 148,719 213,692 213,692 Grants 79,200 430,000 826,800 1,336,000 1,336,000 Rest 9,419 67,500 123,081 200,000 200,000 Impact Fees 247,900 40,100 288,000 288,000 Total Funding Sources: 98,592 800,400 1,138,700 2,037,692 2,037,692 Expenditures: Design 94,278 90,000 - 184,278 184,278 Right of Way 4,314 680,400 - 684,714 684,714 Construction 30,000 1,138.700 1,168.700 1,168,700 Total Expenditure: 98,592 800,400 1,138,700 2,037,692 2,037,692 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Funding Sources: 2005.2010 Beytmd2010 Unrestricted street .. Revenue - - - - - 148,719 Grants _ _ _ _ _ ... 82SAW Reet3 _ _ _ _ _ - 123ABI Impact Fees - 40,100 Total Funding Sources: 1,}38.700 Exwnditures: - Design Right of Way Cenatruttbn - 1 138 700 Total kun: 1,138,700 124 0 9 i City of Aubum Capital Facilities Plan CAPlTALFACILMS-PLAN Project Tide: South 277thgAWN to Green River Bridge) Project No: C222A Project Type: Capacity Project Manager: Scott Nutter Description: AL - This includes including the of three 11aneEmne Ad project majorvANning addition in west amd and one eastbound a Class 1 Irak. Water CFPsha ` a tow priority project in the vicinity be acoomodated by developer. (Mater CFP Proj DS -603-108,109 alPro) DS -601-109,110) Progress Summary: . The NE Auburn area is currentlyundergoing an Environmental Impact Statement that intludesthe impacts of future development.inthe vitinky of thiepmject :2005 moniesare to coordinate wM potential developers and to assist in seeking of grant funding for the project Impact on Operating Budget Once Completed: The annual maintenance costs for this project Is estimated to be $10,541 Current Year Budget., 2005 Yro Actrw/ Budget Budget Expenditures Balance Adopted Budget - BudgetAmendmena - AdjustedBudget Activity: 2004 YE 2005 Year End Total Project Prior a 2004 Estimate2005 Budget Prolect Tota Q= FundiSources: UnmWoter1shown Revenue - 5,000 5,000 10,000 35,000 .. Grana - _ - 2.143,200 Developer Contributions - _ _ 5550.000 im ct Feas 4,091 4.091 41,791 Total Funding Sourns: 4,091 5 000 5,000 14,091 2,769,991 Er nd,tures: Design 4,091 5,000 5,000 14,091 139,091 Right or Way - - _ - 500,000 Construction 2 130 900 Total Expenditure: 4,091 5,000 5,000 14,091 2,769,991 Forecasted Project Cost: _ _- 2006 2007 2009 2009 2010 TOW -ksra::: Some - 2006-2010 2010 Unr9aMOM Street Revenu - - 25.000 _ .. _ 30,000 Grana - - 100,000 200.000 1,643,200 2,1{.7,200 ... Developer, Con0ftdb a - 200,000 100.000 250AN 550,000 Fbes 37,700 37 700 Totalw sources: 325,000 300,000 2,1304900 2,790,900 E1 .. DIAM 125,000 _ 130,006 ' Right Of Wry _ _ 200.000 300,000 - - 304,000 Construction- 2130900 2130900 Total 325000 300 000 213D 900 2 760 900 125 City of Aubum Capital Facilities Plan Description: CAPITAL . -f t7lES PLAN Construct a multi lane arterial from 3rd St. NW to 14th St. NW. This will improve mobility and 2005-2010 : development a It consistentawNh the. comprehensiite plan and con ' �to the completion of a North-South aNeiial Project Title: A Street NW Phase 1: 3rd Street to 14th Street NE Project No: C207A Project Type: Capacity Project Manager: Bill Helbig Description: Construct a multi lane arterial from 3rd St. NW to 14th St. NW. This will improve mobility and is tied - development a It consistentawNh the. comprehensiite plan and con ' �to the completion of a North-South aNeiial Progress Summary: The ptedesign. (3D% design) has been completed _='A portion of the righW-way has been acquired. - This project is .... . partially funded, which will help it scare well in the TIB's TPP Program. A.Public Works Trust Fund Loan in the amount of $275,000 in the year 2006. - - Impact on Operating Budget Once Completed: The annual maintenance cost forthisproject is estimated ID be $117,508.-'- Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget BudgetAmandments Adjusted Budget Activity: 2004 YE 2005 Year End Total Preis& Prior to 200/ Estimate 2005 Bud" Proiect Total Cost Funding Sources: unrestricted Street Revenue - 261.000 _ - 261,000 878,000 Grants - - - - 5,807,000 Other - - - - 727,000 Impact Fees 39,149 10.000 49,149 324,149 Total Funding Sources: 39,149 261,000 10,000 310,149 7,736,149 Expenditures: Design 39,149 10,000 10.000 59.149 622.149 Right of Way - 251,000 - 251,000 1,696,000 Construction 5.418.000, Total Expenditure: 39,149 261,000 10,000 310,149 7,736,149 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total ExpandRme ftatfing sources: 2005- 2010 Beyond 2010 Unrestricted street Revenue 75,000 - 200,000 342,000 - 617,000 Granis 738,000 735,000 1,600,000 2,734,000 - 5.807,000 Dow - 275,000 110.000 - 342,000 - 727.000 Impact Fees 75,000 200,000 295 000 Total Funding sources: 1,088,000 920,000 2,000,000 3,418,000 7,436,000 Ernondltures: Design 563.000 - - - - 573,000 Right of Way 525,ODD 920,000 - - - 1,445,000 . Construction - 2,000000 3,418000 5,418,000 Tota/Er nditure: 1,088,000 920,000 2,000,000 3,418,000 7,436,000 126 0 0 0 4 City of Aubum Capital Facilities Plan CAPITAL-'FACWIES PLAN , 2005.2010 Project Title: 'M' Street Grade Separation- E.Main to AWS Project No: C201A Project Type: Capacity Project Manager: Ingrid Gaub Description: x Construction of a grade separated railroad crossing at M Street SE uvqpBNSF Stampede Trades. Project a)so includes construction of the bypass and road connection between k1retSE and Auburn Blade Diamond Road. Progress Summary: The pre -design report has been completed. We are search IN for grant funding.. FAST has committed Design money for 2006. This project will score well in TIBs AIP program once it Peaches Construction,' but not before. A Public Works Trust Fund Loan for $127 M is anticipated in 20072008. Impact on Operating Budget „Once Compfefed ; w The annual maintenance cost for this project Is estimated to be $21,827:' u Current Year Budget 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2006 YE 2005 Year End Tota/Project Prior to 2004 Estimate 2005 Budoet Proiect Total Cost Funding Sources: Unrestricted Street Revenue - - - 511,000 Grants - - - - 15,872,600 Other - - - - 7,878,000 Im act Fees 245,000 5,000 5,000 255,000 369,000 Total Funding Sources: 245,000 5,000 5,000 255,000 24,650,600 Expenditures: Design 245,000 5.D00 5,000 255,000 1,662.600 Right of Way - - - - 8,516,000 Construction 14,472,000 Total Expenditure: 245,000 5,000 5,000 255,000 24,850,600 Forecasted Project Cost: 2006 2007 2000 2008 2010 Total Expenditure Fundino sources: 2005-2010 Beyond 2010 Unrestrlctad street _... Revenue 21.000 - 490,000 511,000 .. Grab 240,000 4,200,000 7,362.800 4,070,000 - 15.072,600 Other - 800,000 466,000 2,440,000 4,172,000 7.076,000 , knpwt Fees 34.000100.000 139,000 Total Funding Soames: 295,000 61000,000 7.028,000 7,000,000 4,172,000 24,400,600 Expenditunts: Design 295,000 - 1,000,000 112,600 1.412,600 Right of Way - 4,000,000 4,516,000 8,516,000 construction 3,300,000 7,0D0,000 4.172,000 14.072 Tob/Ex d/ture: 295,000 5,000,000 7,928,600 7,000,000 4,172,000 24,.!M to 127 City of Aubum Capital Facilities Plan 0 CAfs1TAt FACILITIES PLAN 2005--2010 - - Project Title: C Street SW (15th St SW to Ellingson) Project No: C326A Project Type: Capacity Project Manager: Bill Helbig Description:" Widen'C' Street SW behveen 15th Street SW and Ellingson to at2mmodate 2 southbound lanes, 1 -northbound through laneandrequired tum lanes. This project: includes two n* traffic signals, one at the new Safeway distribution centerentrance and,the otheratthe GSA entrance. j7r, Progress Summary: - The design and right-of-way are being completed in 2004.. Construction will begin In 2004 and is scheduled for completion in 2005:" Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be 522,898 - Current Year Budget: 2005 YTD Actual Budget Budget Espendltunss Balance . Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total project Prior to 2(q4 Estim 2005 Buda*( pmlect Total Furtdin Soames: Unrestricted Street Revenue - - 400,000 400,000 400,000 Traffic Impact Fees - - 200,000 200,000 200,000 EDA Grants - 624,000 1,376,000 2.000,000 2,000,000 King County - 50,000 - 50,000 50.000 Dovob - 600.000 750,000 1 350,000 1.350,000 Total Fundin Sources:1,274 000 2,726,000 4,000 000 4,000,000 Er ndduns: Design - 436,000 - 436,000 436,000 Right of Way - 3,000 - 3,000 3,000 Construction - 635,000 2726,000 3.561000 3561,000 Total Er ditum, 1,274,000 2,726,000 4000,000 4000000 Forecasted Project Cost: 2006 2007 200E 2009 2010 Total Erpendgra Fondling Sources: 2005-2010 ,. Bewondmo Unrastrlcted Street Revenue _ _ _ _ _ 400,000 .. Traft Impact Fees - _ _ _ - 200,000 EDA ownb _ _ _ _ _ .. 11,076,000 King Count'Developw _ - 750,000 . Toth Fmp Soun;es: 2.726.000 E�endlfuns: Design Right or Way Construction_ - -. - $726,666 -a, - - 11 128 City of Aubum Capital Facilities Plan 1] Description: CAPITAL FACILMES PLAN ,, , Project Title: T Street NE Corridor Project No: C415A Project Type: Capacity Project Manager. Scott Nutter 1] Description: The final alignment of the T$S t Corridor is being anal¢ed as pq� NortheastAuburn Special Area. P,� jan Environmental Impact Stu io"y be developer funded. The osection will portion of the ROW and Corstrudcrss likely be a; arterial City Comprahersive Plan- it will argova mobility and is consistent with the..: p A Comprehensive Plan_. it will,6omplete a major north south arterial 52nd St NE. -to Harvey Rd. Future sewer line proposed to be a combination 10 in. & 30 in. rune. - Progress Summary: .._. A pre -design report (including public invokwnent) is scheduled for 2005. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $17,568. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Total Project Prior to 20D4 Estimate 2005 Budget Protect Total Cost Funding Sources: ' Unrestricted Street Revenue - - 5,000 40.000 45.000 45.000 Developer - - _ _ Other - - - - 5,760.000 Impact Fees Total Funding Sources: 5,000 40,000 45,000 5,805,000 - Expenditures: Pre -Design 6 Design - 5,000 40,000 45,000 505,000 Right of Way - _ _ - 1.020,000 Construction 4,280 000 Total Expenditure: 5,000 40,000 45,000 5,805,000 Forecasted Project Cost: 2006 _ 2007 2008 2008 2016 Total EVendl8rre Funding Sources: ...-... 2005-2010 . Bftvnd 2010'... Unrestricted Street Revenue - _ _ _ - 40.000 . Developer .. •. , - ..: Other 480.000 - 1,020.000 4,280,000 - - 8,780,000 Impact Fees . Total Funding Sources: 460,000 1,020,000 4,280,000 5,800,000 Expenditures: - Pre -Design 6 Design 460,000 _ _ _ 800,100 Right of My - 1,020.000 1.020,668 Construction 4280,000 Total Expartailturw 460,000 1,020,000 4,280,000 8 000 iV*J City of Auburn Capital Facilities Plan CAPITAL F IUTIESPLAN Project Title: W Street Loop Project No: PR529F Project Type: Capacity Project Manager. • Jennifer Dvorak Description: This project is the final phase of f' id'StreetSW Grade:Separation P t= It Wit construct a new asphalt road connecting A Street SW and:Divi Streal and thereby provide:muttiple "CA mutes into the Auburn Station Garage_ Landscape strips, sidewalks, driveways, lighting and storm drab a will be included. - Progress Summary: ,- Design and Right of Way are being completed in 2004. Construction scheduled for 2005. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $851. Current Year Budget., 2005 YTD Actual Budget Budget Espendttures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End To tat Project Prior to 2004 Estimate 2005 Budget Protect Tota! Cost Funding Sources: Unrestricted street Revenue 6,365 7,035 134,850 148,250 148.250 Grants - 45,000 254,900 299,900 299.900 Bond Proceeds - - - - _ Impact Fees Total Funding Sources: 6,365 52,035 389,750 "0'150 448,150 Expenditures: Design 6,355 30,000 - 36,365 36,365 Right of Way 22,035 - 22,035 22,035 Construction 389,750 389.750 389,750 Total Expenditure: 6,365 52,035 389,750 448,150 "11150 Forecasted Project Cost 2006 2007 2008 2008 2010 Total- Eapwxghm Funding Sources. 2005-2010 Beyond 2010 Unrestricted Streat - Reverrue _ - _ 13.4,850 - Grenh Bond Proceeds _ 254,900 h7pactrses -- Total funding Sources: 389,750 FrDanditures: Design Right of Way Construction389 750 Total Expenditure: 389,750 130 • 0 i 0 0 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN Project Title: Citywide Intelligent Transportation System Project No: C307A Project Type: Capacity Project Manager: Ryan Johnstone Description: the Cily- The project also includes traffic This project incudes interconnect and coordinatbn for all 1hare management cameras, fiberoptic interconnect and related abng SR164 (Aubum Way So) and S. 277th Street corridors. The project will construct a traffic controlthe eldsting M&O facility. This project is required for special event traffic management and incident response. -7- - - Progress Summary: Impact on Operating Budget Once Completed. The annual maintenance cost for this project Is estimated to be $5,000- Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 EsOmate 2005 Budnet Protect Total cost Funding Sources: Unrestricted Street Remnua 3,000 2,000 63,981 68,981 113,000 Grants - 175,000 688,981 863,981 2,292,000 Muckleshoot Indian Tribe - 175,000 125,000 300,000 300,000 King county 500,000 500,000 500,000 Total Funding Sources: 3,000 352,000 1,377,962 1,732,962 3 05 000 Expenditures: Design 3,000 352,000 170,000 525,000 525.000 Right or Way - - - - consbue0on - 1,207,962 1,207,962 2,680,000 Total Expenditure: 3,000 352,000 1,377 962 1,732,962 3,205,000 Forecasted Project Cost., 2006 2007 2008 2008. 2010. Tww ': EVeounu e Fundis sources: - .. 2005-7010 BeyoW 2010 UnnssWcOnd Streat Revenue 44,019 _ _ _ _ 106,000 Grants 1,428,019 - - - - 2,117,000 Muckleshoot Indian Trine _ _ _ _ - 12"M KM O 500 000 TotalSources: 1,472,038 2,e50,ow Extanldlfures: Design _ - _ _ _ 1701000 - Right ofWay - construction 1,4 03fi eeo TotatExpenolitiag. 1,472,038 50 131 City of Aubum Capital Facilities Plan CAP_ f�AL FACILLTJES.PLAN_ Project Title: Reopen Academy Drive PHASE 2 Project No: C411A . Project Type: Capacity Project Manager: TBD Descriptions The goal of this project is to resale the slide damaged portion and r Academy Drive between SR 164 and Green Valley Road for local tra Progress Summary., A geotechnical study was initiated in 2004.' The project feasibility, scope and mat will be determined upon completion ` of the study. The figure here represents a best estimate given available information. -> Impact on Operating Budget Once Completed: - .......- _ The annual maintenance cost for this project is estimated to be $6 806 Current Year Budget: 2005 YTD Actual Budget Budget Ezpendhures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Total Protect Prior to 2004 Estimate 2005 Budget Proiect role l cost Funding Sources: Unrestricted Street Revenue - Grants _ _ 8.996,000 General Fund - 200,000 - 200,000 1,604,000 Impact Fees Total Funding Sources: 200,000 200,00(1 10.600,000 Expenditures: Design - 200,000 - 200,000 1,100,000 Right of Way - - - - 500,000 Con"uctlon 9,000,000 Total Expenditure: 200,000 -T00,0,00 10,600,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 '... Total - E;gmdf m Funding Sources: 2005-2010 2010 Unrestricted Street Revenue - Grants - 475,750 735,250 2,595,000 5,190,000 8,896,000 - Other - 74,250 114,750 405,000 810,000 1,404,000 Impact Fees Total Funding sources: 550,000 850,000 3,000,000 61000,000 10,400,000 Expenditures: Design - 550.000 350.000. - - 900,000 - .. Right of Way - - 500.000 -_ 500,000 ConsfrucHgp 3,000,000 6.000.000 91000,000 Total ditam: 550,000 850,000 3,000r000 6,000,000 10 000 - 132 0 11 11 0 City of Auburn Capital Facilities Plan Project Title: Project No: Project Type: Project Manager: A Street NW, Phase 2 (West Main Street to 3rd Street NW) Capacity TBD Description: $-:. Construct a mutd laneliftrial. This project will connectA S IIN Phase -1 to the Sound Transit Station and the Central Business Ditibrd Progress Summary: Impact on Operating Budget Once: Completed. The annual maintenance cost for this project is estimated to be $1,405.. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ BudgetAmendments Adjusted Budget _ Activity: 2001 YE 2005 Year End Total Project Prior to 2Q01 Estimate 2005 Bud oet PrQrect To Cost Funding Sources: Unrestricted Street Revenue Grants - - - - 1,038.000 Bond Proceeds - - _ 1.250,000 impact Fees 362,000 Total Funding Sources: 2,650,000 Ex ndrtures: Design - _ - 200.000 Right of Way - - - - 1,200.000 Construction- 1.250.000 Total Expenditure 2,&W,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total .. ExpenWhsra Funding sources: 2005-2010 Ba 2010.. Umesblcnd street Revenue - Grano - BondPioceeds - - - - 1,038.000 - _ tA39A011 - ..._..1.290,0011 Impact Fees 200.000 162.000 382 Total Funding sources. 200,000 1.200,000 1Awdm 1250.000 Exgendawes: Desitin - - - - 200.000 - - 20DA00 - R1gNOfway - - 1200A00 I'M, D .. construction - - 1 .250,WD Tota! dHun: 200,000 1 1000000 1.250000 133 City of Aubum Capital Facilities Plan Project Title: C Street NW (Main Street to 3rd Street NM Project No: Project Type: Capacity and Pavement Restoration Project Manager: TBD Description: -� Restore to 5lanes ' e)dsting pavement. Widertlioadway with curb, gutter - awalk. Transition to 4 lane width north of 3rd St NW. <Reconst uct.3rd Street NW east to the SNSF Railroad Tra and west to D Street NW.- Make signal modifications at -C- Street and MainStreet and at C Street and 3rd Street Progress Summary: impact on Operatfng.Budget:Once Completed: This Project will have no impact on to operating budget for street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget Esoendltures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budget Project Cost Funding Sources: Unrestricted Street Revenue - _ _ 130.000 Grants - - _ 400.000 Bond Proceeds - Im act Fees Total Funding Sources: 530 000 Ex nditures: Design - - _ _ 22,000 Right of Way - - - _ _ Construction 508.000 Total Es nditure: 530,000 Forecasted Project Cost: .. -. 2005 2007 2008 2009 2010 - Total Eipentlltwa. Firodkity Sources: .200.5- 2010 Beyond 2010 Unrestricted Sonet Revenue - 22,000 100.000 - _ 130,000 . Grant - - 400.000 - - -.. 400,000 Bond Proceeds - - - - - - Impad Fees Total FundM Sources: 22,000 500,000 530,000 Expert Design _ 22.000 - - - 22,000 - - Right of Way: _ construction. 508.000 508,000 Total.Eageendiftirw 22,000 508,000 530,0W 134 LJ 0 0 0 i City of Aubum Capital Facilities Plan CAPITAL _FACILITIES PLAN, 2005.2010 p Project Title: D Street NW (37th Street NW to 44th Street NW) Project No: Project Type: Capacity Project Manager: TBD Description: r e Construct a four lane arterial per the city Comprehensive Plan. improve noNity nortWsouftL This project istied to a pending developmeriL 1t will complete a major rt►Jsouth aqWfrom Ellingson to S. -277th Street: Progress Summary > Impact on Operating Budget OnceCompleted: The annual maintenance cast forthis project is estimated to be $14,054 t, . Current Year Budget: 2005 YTD Actual Budget • Budget Expenditures Balance Adopted Budget _ BudgetAmendments Adjusted Budget Activity. 2004 YE 2005 Year End Total Project Prior to 2004 Estimam 2005 Budget Profect Tots f Cost Funding Sources: UnmsMcted Street Revenue - _ _ 520,000 Grants - - - - 2.240,000 Bond Proceeds - _ _ _ Impact Fees 40,000 Total Fundis Sources: 2,500.000 Ex ntlitures: Design _ _ _ _ 200.000 Right of Way _ _ _ 1.500.000 Construction 1.100.0001 Total Expenditure: 2.500,000 Forecasted Project Cost: -.- 2005 2007 200e 2008 2010 Total egwm l m, Funding So .- 2005-2010 BWand2010;;.. UnresWcted Street Revenue _ - .300.000..: 200,000 220AW "Our - 160.000 1200.000 1.350.000 880.000 Bond proceeds lawact Fees 40.000..40000 Total Fu Sources. 200,000 1..000 500 11700.000 1.100,000 ExpendNures: Design .200.000 - 200.000 Right of Way _ 1,500.000 .1,900,000 conabge0on - _.. 1,1000dD Total Expenditure, 200.000 11500,000 1700 1.100000 135 City of Aubum Capital Facilities Plan CAPITAL FACILITIES PLAN X2005-2010 '—� r3? Project Title: F Street SE (4th Street SE to Auburn Way South) Project No: Project Type: Capacity Project Manager., TBD Description: :. Widen 'F' Street SE to 3 lanes, with parking allowed on both sides, to inalFse the roadway capacity. Install curbs, gutters, sidewalks, and bike lanes 'as wail as crash attenuation at su forthe BNSF railroad bridge. The project may include a traffic signal at F Street SE and 4th Street SE`. liectirnproves mobility and safety. This project also provides arterial relief for the V Street SE Grade Separatio jed -s Progress Summary: - �- -- Impact on Operating Budget Once Completed: The annual maintenance cost for this project ie estimated to be $851 Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity. 2004 YE 2005 Year End Total Project - Prior to 2004 Estimate 2005 Budget Project Total cost Funding Sources: Unrestricted Street Revenue - - - 200,000 Grants - - - - 1,480,000 Bond ProceedsImpact Fees 170,000 Total Funding Sources: - 1,850,000 Expenditures: Design _ _ _ _ 200,000 Right of Way - - - - 250,000 Construction 1,400,000 Total Expenditure: 1 650 000 Forecasted Project Cost. 2006 2007 2008 2009 2010 Total Expenditure Funding Sources: 2005-2010 Beyond 2010 Unrestricted street - - Revenue - - 200,000 - 200,000 'Grants 160,0,000 800,000 - - 00 520 1,480,000 Bond Proceeds. .. _ _ hrtpect Fees 40,000 130,000 170,000 Total FurMht Sources: 200,000 6501000 1.000,000 118501000 Expentl/fures:: Design 200,00 _ _ _ 200,000 Rigid of Way _ 250,000 - _ 250,000 - construction 400.000 1000,000 1,400,000 .- Total Expenditure. - 200,000 650,000 1,000,000 1 50 000 136 i E E 0 City of Auburn Capital Facilities Plan F,IGOS-�01Q�'a Project Title: M street NE (E Main Street to 8th Street NE) Project No: Project Type: Capacity Project Manager: TBD Description:. Widen roadwayto 4 IaneCorlstrud curb gutter and sidewa 9 xY eldsting signals. This projed will improve safety, capacity and niob*y.-Thispmjedis-consistentAvittthe `-prehensimPlan. _ Progress Summary Impact on Operating Budget Once Completed: The annual maintenance cost forthis project is esUrnated to be $3.514 - t- CurrentYearBudget: 2005 YTDAetusi Budget Budget Expenditures Balance Adopted Budget - Budget Amendm ims Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prim to 2004 Estimate 2005 Budge? Protect Total Cost Funding Sources: Unrestricted Street Revenue - - - 394.200 Grants - - - - 1,576.800 Bond Proceeds - - - - Impact Fees Total Funding Sources: 1,971,000 Expenditures: Design - - - - 166,000 Right of Way - - - - 480,000 Construction 1,325,00D Total Expenditure: 1,971,000 Forecasted Project Cost: 2005 2007 togs 2009 2010 row ExpendMme Funding source: 2005-2010 Beyond 2010 Unrestricted Stmt Rawnoe - - 33,2Do 161,ODO 200,000 394,200 Grams - - 132.800 Bond Proceeds 644,ODO 800.000 1,576,900 _ _ _. Impact Res - Tow Funding Source. 166,000 805,000 1,000,000 1,971,000 Exparpolfturew Design - - 166,000 - - 16%we Right Of Way _ _ _ 480,000 _ 480,009 - - Coetruction 325.000 1000.000 1,325,000 Total dMure: 169,000 80 000 1,000,000 1 71 000 137 City of Auburn Capital Facilities Plan CAPITALFAC►IJTIES PL." 2005-2010 Project Title: Realign SR -18 EB Ramp at AWS, Grade Separate BNSF Yard Project No: Project Type: Capacity Project Manager: TBD Description: u; Realign the SRI 13 eastbound car build grade separation of main no lure and Stampede Pass line, a1i connect to 6th Street SE. Widen 6th' Street SE -roadway from 2 to 4 tan " uding signal modifications at *A7 Street and Auburn Way South. This project improves traffic flow significantly d the potential development of the BNSF yard to an intermodal freight facility. Replace a small portion of sewer li Tong 6th Street SE. Progress Summary: Impact on Operating Budget Once Completed:. Not scheduled for completion unlit after 2010. Current Year Budget: 2005 YTDActuar Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2009 YE 2005 Year End Total Project Prior to 200( Estimate 2005 Budget Project Total cost Funding sources: - Unrestricted Street Revenue Grants Other _ _ _ _ 32,000.000 Impact Fees Total Fundis sources: 32,000,000 E endttures: Design _ _ _ _ 3.500.000 Right of Way _ _ _ - 4.000,000 Construction - 24.500.000 Total Expenditure: 32.000 000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tont - EVanditure Furl! sources: 20M-2010: 2010 unnsolpted Street Rewnuq Grams Other _ _ _ bripact Fees _ 1,000,000. 1,000.000 - .:31,000.000 Total Funding sources: 1,000,000 1,000.000 31,000,000 Exoenditurer Design _ _ _ Right of Way - - - - 1.000,000 ... 1,000.000 - - 2,500,000 ,> 4,000,000 Construction _ _ _ .24,500,000 Total ure: 1,000,000 1000000 31,000.000 138 E 0 0 City of Auburn Capital Facilities Plan CAPITAL FACILMESPLAN X05 -201C' Project Title: Harvey and 8th Street NE Intersection Improvements Project No: Project Type: Capacity Project Manager: TBD Description: , Add an EB combineathrough and right tum Mane on 8th StAl"paoaching Harvey Road. MOMytic signals and traffic channelizatlon to acoornmodate the new lane. TtQidditional lane (additional capacity) will improve trait delays and vehicle queuing at the intersection of Havey and AlSIreet NE in an directions. Progress Summary: impact on Operating Budget Once Completed: The annual maintenance cost forthis projectis estimated to be 5703. Current Year Budget: 2005 YTD Actual Budget Budget Expwdituns Balance Adopted Budget BudgerAmendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project PH" to 2001 Estimate 2005 Budget Proiect Total Cost Funding Sources: - Unrestricted Street Revenue - - 339,000 Giants - - - Other Impact Fees _ '- 171,OD0 Total Funding Sources: 510,000 Expenditures: Design - _ 601000 Right of Way - - 100.00D Construction - 350,000 Total li rrditure: 510,000 Forecasted Project Cost: 2006 2007 2006 2009 2010 Total -, ,. - ,.Eap n Fund/ Sources: 2005.2010 2010 Unreamend Street _. Revenue - - 339.000 - - 3300x0 Other - - - Nn Fees - 160,000 11000 - - 171,000 Torii Fundhtg Sources: 160.000 950.000 510000 Exoendltures: Design - 60,000 - - 60,000 Right of Way - 100.000 - 100AN ' Consfruetion - - 350.000 1501000 Total Expendiftwe., 100.000 350,000 510,000 139 City of Auburn Capital Facilities Plan Description CAPITAL FACILMES PLAN, 1 � � <2a05-2pi0 f Install a traffic signal at the into of Kersey Way and Oravetz R Project Title: Kersey Way - Oravetz Road Signal Project No: C205A Project Type: Intersection Improvements (Non -Capacity) Project Manager: TBD Description Install a traffic signal at the into of Kersey Way and Oravetz R '� protect will Improve the safety of t if e intersection. Progress Summary: Design of the project has been completed. Staff is looking for opportunities to apply for grant funds for Construction. Impact on Operating Budget Once Completed - - - The annual maintenance cost for this project is estimated to be$5.643. Current Year Budget: 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budge Project Totaf Cost Funding Sources: Unrestricted Street Revenue 28.000 - 174,000 202,000 202.000 Grants - - _ _ _ Bond Proceeds impact Fees Total Funding Sources: 28,000 174,000 202,000 202,000 Expenditures: Design 28,000 - - 28.000 28,000 Right of Way -- - _ _ Construction 174,000 174,000 174,000 Total Expenditure: 28,000 174,000 202,000 202 000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Funding Sources: 2005-2010 Beyond 2010 Unrestricted Street Revenue _ _ _ - 174,000 Grants Bond proceeds bripact Fees '. Total Ftniging sources: 174,000 €IDsr�Hures: 0151911, Right of Way _ Consultation - - _ - 174,000 Total Expenditure: 174,000 140 0 0 CJ 40 City of Aubum Capital Facilities Plan CAPIJALFACILtTIE& PLANT,l ;�„„zoo�:2ora Project Title: Lea Hill Slide Slope Repair Project No: C219A Project Type: Safety (Non -Capacity) Project Manager: Bill Helbig Descriptlon: _ A portion of 105th Placa E (Lea Hill Rd/107th) ties experie , ideslope failure.. This project will include slideslope repair as required. Progress Summary: The right-of-way issues are being completed in 2004.'Carsbudan is scheduled for 2005. Impact on Operating Budget Once:Completed: This project will have no impact on the operating budget for street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget ErgendUums Balance Adopted Budget Budget Amendments Adjusted Budget Activity. 2001 YE 2005 Year End Total Project Prior to 2000 Estimate 2005 Budoet Protect Tota! Cost Funding sources: Unrestricted Street Revenue 38,888 25,000 100,000 163,888 163,868 Grants - - - _ _ Bond Proceeds Impact Fees Total Funding Sources: 38,888 25,000 100,000 163,888 163,8U Expenditures: Design 38,888 5,000 10,000 53.898 53,888 Right of Way - 20,000 - 20,000 20,000 Consiroction 90,000 90,000 90,000 Total Ex nditure: 38,888 25,000 100,000 163,898 183,888 Forecasted Project Cost 2006 2007 2008 2009 2010 TotalE `...Beyond2010 �. Funding sources: -. _ 2008- 2010 Unrestricted Sava Revenue - - - 104000. ... Grads Bond Proceeds Impact Fres .. Total Fundi Sources: 100,000 Esgendeursa: Design _ _ _ _ 10,000 .. Right of Way .. construction .. 90000 Total Es 100 ow 141 City of Auburn Capital Facilities Plan CAPITAL-F-ACILMES PLAW;--- 2005-2010-,,: 2005.2010, - 7 Project Title: So 277th Wetland Mitigation Project No: C410A Project Type: Non -Capacity Project Manager: Scott Nutter Description:" Wetland mitigation for the 277th .� Grade Separation project' x Progress Summary: is is a 10 year obligation. Impact on Operating Budget Once Completed: This project will have no impact on the operating budget for street maintenance:4- Current Year Budget., 2005 YTDActual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget Activity. 2000 YE 2005 Year End Total Project Prior to 2001 Estimate 2005 Budge f Prolect TO Cost Funding Sources: Unrestricted Street Revenue - 25,000 6,000 31,000 79,000 Grants _ - _ Bond ProceedsImpact Fees Total Funding Sources: 25,000 6,000 31,000 78,000 Expenditures: Design - 15.000 - 15,000 15,000 Right of Way - - - - - Construction 10,000 6,000 16,000 64.000 Total Expenditure: 25,000 6,000 31,000 79,000 Forecasted Project Cost: 2006 2007 2006 2009 2010 Total Expendit" Funding Sources: 2005-2010 Beyond 2010 Unrestricted Street - Revenue ". 6.000 6,000 6.000 - Grants - - 6.000 - exit 36,000 18.000 Bond Proceeds - - Impact Fees Tota/ Funding Soorws: 8,000 61000 6,000 8,000 81000 36,000 18,000 Expenditures:.. Design Right of Way-- -- - _ _ consbuc8on 6,000 6,000 6000 8000 8000 36;00 18,000 Total Expenditure. 6,000 61000 6,000 81000 elm .36,000 18 142 9 9 • 0 City of Aubum Capital Facilities Plan CAPITAL FAGLMES Pl 1iN Project Title: Downtown Lighting Program Project No: C315A Project Type: Non -Capacity Project Manager: Brian Coleman Description: r Perform an engineer ,p study to determine the adequacy of - lighting In Me downtown plan area erfam public 6hfonnatbfnv nIh ement activities to determine a improve for.dovmtown pedestrian lighting. Designandamsbuctclowrthtowm pedestrian lighting im Project is sponsored by the Auburn Downtown Association: . Progress Summary-* Various ehdsbng light f tares in the downtown area are being upgraded in 2004. The areas that receive improvements will be -re-evaluated during 2004. - .. Impact on Operating Budget Once CompieW., This project will have no impact on the operadiig budget for street maintenance - Current Current Year Budget: 2005 YM Actual Budget Budget Expenditures Balance Adopted Budget _ BudgetAnterMments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to Esunia 2005 Budget Prolect Total �ggt Funding Sources: Unrestricted Street Revenue 57,200 20,000 72.800 150,000 150.000 Grants - _ _ _ Bond Proceedsimpact Fees Total Funding Sources: 57,200 20 000 72,300 150,000 150,000 Ex ni itures: Study 57,200 10,000 5,000 72.200 72,200 Right or Way - _ _ - _ Construction 10.000 67,800 77,800 77.800 TotalExpenditure: 57,200 20,000 72,800 150,000 150 rim Forecasted Project Cost 2003 2007 2003 2009 2010 70111/ Expenditure Funding Sources: 2005-2010 Beyond 2010 umeshkted street Revenue - - - - ....... 720300 Grants Bond Proeaeds Inspect Feu TZI Funding Sourns: 7200 Study - - - - SAN_- ftmorW3y eonstruetlan e7 ,1100 Toed EmNsertunt. 72.800 143 City of Aubum Capital Facilities Plan Description: This project will construct an and of the BNSF Railroad in _ .: with a pedestrian bridge to al direct, attractive non -motorized access n neghbodroods in theCdy of and schools m the City. CAPITALAACILMES PLAN'S=` i °2005-201tI � �` Project Title: BNSFIEast Valley Highway Pedestrian Underpass Project No: C229A Project Type: Non -Capacity Project Manager: Jennifer Dvorak Description: This project will construct an and of the BNSF Railroad in _ .: with a pedestrian bridge to al direct, attractive non -motorized access n neghbodroods in theCdy of and schools m the City. of Auburn. . Progress' Summary: The project predesign (30% design) is being completed in 2004. The currenfgrant source is to supplement the design of the project only.-Additionatdesign dollars are needed along with Construction and Right of Way. The City is applying for grant resources_. The City is anticipating $150,000 in Federal High Speed Rail Money(section 1103C). .. Impact on Operating Budget Once Completed: -: The annual maintenance cost for this project is estimated to be $420.. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted -Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total project Prior to 2004 Estimate 2005 Budoet Project Total Cost Funding Sources: Unrestricted Street Revenue - - - 100,000 Grants 3.817 146,183 - 150,000 2,850.000 KC Open Space Bond - 40,000 - 40,000 40,000 Other 500,000 Total Funding Sources: 3,817 188,183 190,000 3,490,000 Expenditures: Design 3,817 186,183 - 190,000 340,000 - Right of Way - - - - 150,000 Construction 3.000.0001 Total Ex nditum: 3,817 186,183 190,000 3,490,000 Forecasted Project Cost: 2906 2007 2008 2009 2010 Total : Expenditure Funding Sources., 2005-2010 Betrond2010 unrestricted street Ra,arrue - 50,000 50.000 - _ ,too.= Gn; ts'. 300.000 1,200.000 1,200.000 _ ".- 2,700,000 .... KC Open Space Bond -- - Other 250 000 250.000 500.000 Total Mf Sources: 300,000 1,5.900 1,500.000 - 00 3,300,000 Expenditures: Design , 150.000 - - .. _ - 150,000 Right of Way 150.000 _ 150,000 Construction 1.500.000 1.500.000 3,00D,000 Tota/ Rurs: 300,000 1,500,000 1 500,000 3,300,000 144 0 0 0 City of Aubum Capital Facilities Plan CAPITA, '-FACaMES-P 20052010 ' Project Title: Annual Arterial Pavement Preservation Project No: Project Type: Non -Capacity (Annual) Project Manager: TBD Description: Implement regular maintenance andfor rehabllrtation of various ' streets.. Auburn Black Diamond Road is identified as a potential candidate for 2005. - Progress Summary: _ F 7 Impact on Operating Budget Once Completed. This project Will have noimpaetondmoperating budget forshaetmaintenance,.r ..,.. .. , ..: . Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prim to 2004 EsOmate 2005 Budoet Project Total Cost Funding Sources: Unrestricted Sheet Revenue Grants _ _ _ _ _ REET Funding - - 500,000 500,000 3,000,000 impact Fees Total FundingSources: 500,000 500,000 3,000 000 Ex Hures: Design - - 40.000 40.000 540,000 Right or Way - - _ _ - Consttucdon 460 000 460,000 2 460 000 Total Ex ndlture: 500,000 500,000 3,000,000 Forecasted Project Cost: 2066 2007 2009 2009 2010 Tota Expwew" Funfflng Sources: 2005.2010 Beyond 2010 UmssMcted 5heet Revenue Grano REETFundhV 500,000 500,000 500.000 500,000 500.000 3,000,000 hn ct Faes Total Funding souroes: 500,000 5001006 swgo00 500.000 500,000 3,000,000 Ems: Design 100.000 100,000 100.000 100.000 100,000. .. - 540,000 - R"Ofway _ construction 400,000 400000 400000 400,000 400000 2 Toth 500 500.000 500 500,000 500 000 30000 145 City of Auburn Capital Facilities Plan CAPITAL FAC/LfTIESPLANi-= 200520'10 Project Title: Citywide Pedestrian Crossing Program Project No: Project Type: Non -Capacity (Annual) Project Manager: TBD Description:;' This project provides for ped ety studies at various locations 6.. Projectsire prioritized annually based on safety issues and pedestrian demands:: 7 -Budget Notes: This is an annual level of effort project used to fund small pedestrian safety studies and 1 ntjroects. - P Progress Summary: ; 2004 foals is in the downtown area. 2005 will complete area identified that require special design in the downtown area, and begin to expand to other areas in the City. Impact on Operating Budget Once Completed: = Thisro ect will have no impact on the o P 1 pa operating ` Current Year Budget: 2005 YrD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: _ 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budge Proiect TO Cost Funding Sources: Unrestricted Street Revenue - 20,000 50,000 70,000 170,000 Grants - - - _ - Bond Proceeds- Im ct Fees Total Funding Sources: 20 000 50,000 70,000 170 000 Expenditures: Design - 5,000 10,000 15,000 15,000 Right or Way- - _ _ - Construction 15.000 40,000 55,000 155.000 Total Expenditure: 20 000 50,000 70,000 170,000 Forecasted Project Cost 2008 2007 2008 2009 2010 Toral Eapendlfuie Fundrag Sources. 2005-2010 Beyond 2010 Unrestricted Street Revenue 20.000 20,000 20,000 20,000 20.000 130,000 Grants _ _ _ _ Bond Proceeds Fees Total Fundt sources: 20,000 20,000 20,000 20,000 20,000 150,000 Expenditures: Design - - _ _ _ 10,000 Right of Way - - - _ construction 2(1,000 20,000 20,000 20,000 20,000 140,000 Total Experulftunt. 20,000 20,000 20,000 20,000 20,(100 150 000 146 0 0 0 0 0 City of Aubum Capital Facilities Plan CAPITAY F1tCILTIIES PLAN $ � `200SZ0f0 Project Title: Citywide Roadway Safety Infrastructure Improv. Project No: Project Type: Non -Capacity (Safety) Project Manager. TBA Description:a This project pro rides[k frastructure ergxovements to enhan safety. Projects are prioritized annually based on field studies. Terrace is scheduled for 2004 and the of Lake.Tapps Parkway is scheduled for 2005. Progress Summary: The motley dedicated in 2005 will be used to complale the Lea Hill Slide Repair pmjecL Impact on Operadng Budget Once Completed: . This project will have no impact on the.. oPera6n91rUd8ettorstreetinanEenance.''' . Current Year Budget: 2005 rrD actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 7001 YE 2005 Year End Total Project Prior to 2001 Estiman 2005 Budget Protect Total Funding sources: Cost Unrestricted Street Revenue - 100,000 - 100,000 600,000 Grana - - _ - Bond Proceeds - Impact Fees Total Funding Sources: 100,000 100,000 600,000 Expenditures: Design - 20.000 - 20,000 70.000 Rightof Way - _ _ _ Construction 80,000 80,000 530,000 Total tun: 100,000 100,000 600 000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tgtal EMMKO m Fun sources: 2005-2010 2010 UruesefeNd Street Revenue 10D,0D0 100.000 100.000 100.000 100.000 600,000 Grants Bond Proeeeds hapmet Fess Total Funding Sourees: 100,000 100,000 100,000 100,000 100,000. 500,000 J Design 10,000 10,000 101000 10,000 10.000 60,000 Rightof Way - - 90 000 90 000 90,000 90,00D 90 000 450,000 T02Ceutruc6on 100,000 100ACO 100 100,000 100,000 500,000 147 City of Auburn Capital Facilities Plan CAPITAL FACILMES PLAN- ` "30057010 Project Title: West Main Street Streetscape Project No: C322A Project Type: Non -Capacity Project Manager: TBD Description: - Develop bike lanes and restore sidewalk to link the Interurban Trail to D Aubum and the Soured Transit Center. Progress Summary.,.. Federal STP funds are being obligated prior to January 1, 2005. Public involvement will be completed in 2004; design is scheduled for 2005. Impact on Operating Budget Once Completed., ;._ This project will have no Impact on the operating budget for street maintenance (rebullding4n-kind project). Current Year Budget., 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Totatproject Prior to 2000 Estimate 2005 Budget Prciect Total Cost Funding Sources: Unrestricted Street Revenue - - 22,000 22.000 109,523 Grants - 140,250 140.250 701,656 Other _ _ Impact Fees Total Funding Sources: - 162,260 162,250 811,179 Expenditures: Design - 162,250 162,250 162,250 Right of Way - - _ _ - Construction - - 648.9291 Total Expenditure: 162,250 162,250 811,179 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toad Exputrllh r, Fundbig Sources: 2005-2010 Beyond 2010 Unrestricted SOON . . -Revanwo 67.523 Grants. 561,406 - - Other _- - 701,686 Impact tees _ - _ Total Funding Sone 648,929 811,179 Expertdituras: Design _ _ Right of Way. _ _ .182,250 . Construction 698.929 - - - - _ `-- 648,929 Total Expenditure: 848,929 811,179 148 11 0 11 City of Aubum Capital Facilities Plan CAPITAL FACII MS PLAN =` -r, 2005.3010' x;=Y- Project Title: West Valley Hwy Pedestrian Facilities Project No: C3028 Project Type: Non -Capacity Project Manager. Bill Helbig Description: Construct a Class t bi _trail along the eastern side of West Highway. The project includes pedestrian lighting g _ along the trail_ The fu for this project if through TIB. W ' , Highway was reconstructed in 2003 along the same stretch of roadway. Progress Summary: The project is schedule to be completed in 2005. Impact on Operating Budget Once completed: The annual maintenance cost forihfs project is estimated to be$840. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendrnems Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2001 Estima 2005 Budd at Project Total cost Funding Sources: unrestricted Street Revenue 2,426 _ - 2,426 2,426 Grants - 21 40 - 403.23.221 403,221 Sewer fund Transfer - 10,000 134,000 144,000 144,000 Impact Fees Total Funding St u ces: 2,429 10,000 537,221 549,647 549,647 Ex nditums: Design 2,426 10,000 20,000 32,426 32,426 Right of Way - - 145,000 145,000 145,000 construction 372,221 372,221 372.221 Total Ex ndhum: 2,429 10,000 637,221 549,647 %9,647 Forecasted Project Cost: 2006 2007 2006 2009 2010 rofal Ewan: Fundi Sources: 2M-2010 Boyand2010.. Unrestricted Street Revenue - Grants - - -. Sewer Fund Transfer - _ _ 40321 knpactFees _ Total FuMI Boraces: 537,221 Ext»ndhuras: Design _ _ _ _ _ 20,000. . Right of Way Construction Toth sure: 149 City of Aubum Capital Facilities Plan CAPITAL FACILITZESPLAN '. Project Title: Auburn Way South Safety Improvements Project No: C1014 Project Type: Non -Capacity (Safety) Project Manager. Jennifer Dvorak Description: This projectwas created in res State safety study. The project m `isafety irrprovements'aiong Autwm?Way: South (AWS) between 6th Strjf�aE.and M Street SE_ The antiapated�" is include rechannel®tion of AWS to limit left gums; a new paf6Cstgrlet at the "areactionI of Aubum W -t-h and 'F Street SE signal - interconnection, and widening for an additional lane between D Street SE Steel SE. This project will significantly improve:the safety of the corridor. Progress -Summary: Pe design and right of way are being completed in 2004. Construction is starting in 2004 and scheduled for " completetionin2005. Impact on Operating Budget Once Completed: This: project will have no impact on the operating budget for street maintenance. The State -maintains the pavement - nSR-164. Current Year Budget., 2005 YTDActual Budget _- Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2006 YE 2005 Year End Total Project Prior to 2006 Pstimate 2005 Budget Project Total Cost Funding Sources: Unrestricted Street Revenue 124,813 120,732 709,477 955,022 955.022 Grants 196,063 450,000 185.523 831,586 831,586 Developer Furls - 98,000 _ 98,000 98,000 Impact Fees Total Funding Sources: 320,876 668,732 895,000 1884,608 1,884608 ndltures: Design 319,799 68,732 - 388,531 388,531 Rightof Way 1,077 40,000 - 41,077 41,077 Construction - 560,000 895,000 1,455,000 1,455,000 Total Expenditure: 320,876 666,732 895,000 1,884,608 1,894,608 Forecasted Project Cost: 2006 2007 2008 2008 - 2010 Total FapendRum- Fundt � 2005-2010 Beyond 2010 Unmsrrktad Revenue,. 709,177 ..... _... _ - Grants - _ _ _ _ 788.523 Developer Funds Iffmact Fees Total Funding Soun : 695 o00 Expenditures: Design ... - -. Right of Way construcdon Total 893 000 150 11 i i 0 • City of Aubum Capital Facilities Plan Description: ,. -CAWA� FA¢1IJi7ES PLAN ' z00s=2tria'. Project Title: M St SE (37th f 29th) Design Study Project No: Project Type: Non -Capacity Project Manager: TBA Description: ,. ;;;tom Perform a predesignrnd fessiblily study The intent s ro a projetx to remedy the pavement contlition of the ' i roil; upgraAe the rrd Lo talrrent starlAards and rtnDrove facii6as. Replace sewer from 32nd Street SEnonh-to29thStreetSE-` - "`` -� '" - Progress summary.; Predsign study will be completed in 2004.F7 Impact on Operating.Budget.Once Completed: _- • .-... .... No operating: impact because this is design study only. - Current Year Budget: 2005 YTD Actual Budget Budget Expendltures Balanre Adopted Budget _ Budget Amendments Adjusted Budget - Activity: 2001 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budget Protect Total Cost Funding Sources: Unrestricted street Revenue - 10.000 10,000 10.000 Grants - - - Bond Proceeds - Impact Fees Total Funding Sources: 10 000 10.000 10,000 Expenditures: Pr Deslgn - 10,000 - 10,000 10.000 Right of way - - - construction Total Expenditure: 70.000 10,000 10,000 Forecasted Project Cost: -. 2000 2007 2008 2009 - 2010 Total . Evendltur '.. FundIng sources: 2005.2010 BOYOW 2010 unrestri~ street . . Revenue Gran - Bard ProceedsIntpact Fees .. . .-. Total Funding Sources: Fmodie.re.- Pra•Deslpn Right or Wry , conswctron Total Expenditure; 151 City of Auburn Capital Facilities Plan CAPITAZFACILMES PLAN Project Title: Auburn/Pacific Trail (C Street SW) Project No: Project Type: Class 1 Trail Project Manager: TBA Description: ,•.' _ . _ This w project will construct a Class 1 meandering trap betweml the deer of Aubnan marc abrg the ares[ side of C Street SW (Auburn) and Skin rla Road (Psoric will sfert in Arlltm ffi 15" Street SW end at the sauBrerBtamilus of SMnner Road. strung willbe lrlxfalled along 3r Averim SEin Pacific to cxrrneC[ a bike lane from. the trap ends at Skktrer Road to the southern end of the Interurban Trail. The Class 1 trap will be approximately 2.05 to and the Strlpklp portion will be 1.42 na7es, _ . Progress Summary:.._. TMs project is fully funded with STP funds. it will be atnsinrcted concurrently with the C Street sw x6denirg project (cmr.A). .. Impact on Operating Budget Once Completed. . The annual inaintetlande cost for this project is estimated to be $Z6BB: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ BudgetAmerdments _ Adjusted Budget Activity: 2000 YE 2005 Year End Total Ftciscr Prior to 2004 Estimate 2005 Budaet Protect TO S$g Fundi Sources: unrestricted Street Revenue - _ _ 32,000 Grants 341.914 City of P"Hk _ - 22'000 Im act Fees _ _ Total Funding Sources: 395914 Expenditures: Design _ _ 79.133 Right of Way _ _ - Construction - 316.731 Total Ex dhuB: 395,914 Forecasted Project Cost: Funding 5003 2007 2003 2009 2010 Tool Sous& Ergendifur, ... 3003_2010 unraeulcad seaat 2010 , Reronua 32.000 - _ _ - $0D0 Grant 341.914 - 341.914 city of Poem 22.000 _ / FMa 22,000 Total Fund! Sources: 395,914 394914 .. Expenditures Design 79,133 - 79,1e3 Right of way :. - - Consbacaon 316731 - - 31 731 Toff 395,914 _ _ 395,914 152 9 0 r] City of Aubum Capital Facilities Plan CAPITAL FACILM-ES PLAN Project Title: Urban Area Transportation System Management Improvments Project No: Project Type: Non -Capacity Project Manager. TBD Description: — , This project will modify Tour intersections to improve bus tumi t ri and will reconstruct 2nd Street SW between A Street SW and A Street SE: Progress Summary: _ Impact on Operating Budget Once Completed: - This project will have no impact on the operating budget for street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2001 Estimate 2005 Budget Prosect Total Cost Funding Sources: Unrestricted Street Revenue - - _ 6.794 Grants - - - - 554.243 King County Metro - - - _ 100.000 Impact Fees Total Funding sources: 881,037 Expenditures: Design - - - - 207,152 Right of Way - - - - 47,688 Construction 406,197 Total 6( enditure: - 881,037 Forecasted Project Cost: 2008 2807 2008 2009 2010 TOW Expeaft" Funding Sources: 2005.2010 Beyond 2010. Unresiricted Wee( - Revenue 6.794 - - - _ 6.704 . Grants 554.243 _ _ _ _ 554.243 Mag County Metro 100,000 _ _ _ _ _ 100.000 impact Faes " Total Ponding Sources: 661,037 661.037 ExperWhurea: Design 207.152 _ _ - _ _ 207,182 Right or Way 47,666 - - 47 666 Consfruetlon 406,197 408 107 Total Expenditure: 661,037 881,037 153 City of Auburn Capital Facilities Plan CAPITALFAt&M&SPLAN ,-i `� Project Title: White River Trail Extension Project No: Project Type: Non -Capacity (Non -Motorized) Project Manager. TBD Description: The Proposed project 1.050 foot extension, of the exisffig Class 7 White ra0 Tran its temdnus in Roegrw Park to A Skeet SEEM Valley:Highway, The tra`lt-extension will link the eadsfing pedestria. ,� hies from Rhlerside Ngh.School and Ilalko Elementary School to A Sheet SE. Thisprojectwill grant school children safe _across the White River via the bridge on A Street SE. It will aim connectl D AubuWs BNSFJEast Vafiey Highway tlnde residential areas in the cky of Pacific to schools in Auburn._.':._ ' g, P�ding direct sown from the Progress Summary: Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be"S76B LLYTD Current Year Budget: 2005 Actual Budget Budget Expenditures Balance Adopted Budget _ BudgetAmendmems Adjusted Budget Activity.- 2004 YE 200.5 Year End Total Project Prior to 2004 Estimate 2005 Budoet Project Total Cost Funding Sources: Unrestricted Street Revenue - - - 27,200 Grants _ _ _ - 174.200 Bond Proceeds - Impact Fees Total FundingSources: 201,400 Ex nditures: Design _ _ _ - 17.500 Right of Way - - - - 140.000 Construction 43,900 Total Expenditure: - 201,400 Forecasted Project Cost: 2006 2007 2008 2009 .2010 - TOW Experld0 ne Fundln Sourosa: 20M - 2010 Be 2010 Unreseicted Street Revenue - - 27.200 - 27,200 Grans - - - 174,200 - - .. 174,200 Bond Proceeds Impact Fees . Total Funding sources: - 201 AN 201AN Exoendxursa:.. Design - - 17,500 - - 17,600 Right or Way - - 140,000 - 140,000. _. Conshueflm - 43.900 43.900 TofN Ex erdgure: 201,400 201 AN 154 0 L 0 City of Aubum Capital Facilities Plan E Description: CAPITAL -FA Widen roadway shouldw; accomrnodate:bicydists and -it wil proadea muiti-modal entsncernent to a regional recreation bike routs. Mitigate expected impacts to wetla adjacent to the road. Feasibility study to be initiated in 2004- Project Title: Auburn Black Diamond Non -Motorized Class I Trail Project No: Project Type: Study Project Manager. TBD E Description: Widen roadway shouldw; accomrnodate:bicydists and -it wil proadea muiti-modal entsncernent to a regional recreation bike routs. Mitigate expected impacts to wetla adjacent to the road. Feasibility study to be initiated in 2004- _ Progress Summary: - Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be 51280. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget , Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estims 2005 Budoet Protect Total Q9 Funding Sources: Unrestricted Street Revenue - 35,000 35,000 35,000 Grants - - - - Bond Proceeds - - - - Impact Fees Total Funding Sources: 35,000 35,000 33,000 Expendlonvs: Design - - 35,000 35.000 35.000 Right of Way - - - Construc0on Total Ex tlHure: 35,000 35,0110 35,000 Forecasted Project Cost: 2005 2007 2005 2009 2010 Told F.xpend/6ne... FinidIng, sources. 2005-2010 2010: unres&k w street Revenue _ - Brands _ _ 35,000 Bow Pioasda intiulct Fes Total Funding sources: 35,000 - Design - _ _ '. 05.000 - R1gndolWay- ConsmncYlon - Toth /tune: 155 City of Aubum.Capital Facilities Plan CAPITAL FACILMES PLA "2005.20107. �. s Project Title: Auburn Way Corridor -Pedestrian Crossing Project No: C409A Project Type: Non -Capacity Project Manager: Jennifer Dvorak Description: This project will determine the feasi jiy. cost and concept of imp ng enhanced pedestrian crossirigs, landscaped medians and restricted left turn .Wnes onAuburn Way 4th NE to Cross Streat. ->- Progress Summary: This may potentially score well for TIB's PSMP Program Impact on Operating Budget Once Completed: This project will have no impact on the operating budget for street mairdenance.' Current Year Budget: 2005 Yro actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End Total Project Prior to 2000 Estimate 2005 Buda et Proiact role l Cost Funding Sources: Unrestricted Street Revenue - _ Grants - - _ _ _ Other (Gen Fund 001,17) - - 50,000 50,000 50,000 impact Fees Total Funding Sources: - 50,000 50000 50,000 Expenditures: Design - - 10,000 10.000 10,000 Right of Way - - _ _ - Construction 40,000 40.000 40,000 Total Expenditure: 50,000 50,000 50,000 Forecasted Project Cost: 2008 1007 2008 2009 2010 Total E+Pmrdffure wruA Sources: 2008.2010 Beyond 2010 Unnsriefed SOeN Revenue Grants _ Other (Gen Fund 001.17) - _ _ _ _ 50,000 . Nn trees - TotalwndMg sources: _ 50,000 Expermura: Design - - - ':: - 10,000 Right of Way _ Conseuction - 40,000 Total /furs: 50,000 156 0 0 is 0 City of Aubum Capital Facilities Plan Description:. Design and construct a'Class 'I NonJ&torhmd-Trail from Beach Access to Brannan Park Coordinate .X :-,:-.. CAPITAL'FAC/L7JMES.P,LAN with Auburn Parks Department and tGng County Parks. ..w.,, 2005-20'JO Project Title: Green River Trail, Phase 1 Project No: Project Type: Non -Motorized Trail Project Manager: TBD Description:. Design and construct a'Class 'I NonJ&torhmd-Trail from Beach Access to Brannan Park Coordinate with Auburn Parks Department and tGng County Parks. Progress Summary Impact on Operating Budget Once Completed: The annual maintenance cost for.this project is estimated to be $2,856. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ BudgetAntendments - Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate Funding Sources: 2005 Budget Project Total Cost Unrestricted Street Revenue - _ - Grants - - _ _ 620.000 Bond Proceeds - impact Fees Total Funding Sources: 620,000 Ex enditures: Design - _ - 225.000 Right of Way - _ - _ - construction - 395,000 Total Ex aditure: 620,000 Forecasted Project Cost. 2006 2007 2006 2009 2010 Total Experdltun FmdM Sources: - 200.5-2010 Beyond 2010 UnastAcled Sbeet Revenue - _ _ Gann - 125.000 495,000 - Bond Proceeds _ _ _ 620,000 _ Im Fess Totd Scums 125.000 195.000 620,000 — __ Expenditures: - 125,0D0 100.000 - Right of Way _ _ _ _ - 225.000 _ - construction - 395.DD0 39 000 Toth Expencilture. 125,000 495,000 620000 fiyl City of Aubum Capital Facilities Plan Description: CAPITAL `FACILITIES "PLAN'' _ 200&2010 Project Title: Green River Trail, Phase 2 Project No: Design and construct a Class 1 Nott -Motored Trail from Brannan Pat" th Street SE. Project Type: Non -Motorized Trail Project Manager: TBD Description: _ Design and construct a Class 1 Nott -Motored Trail from Brannan Pat" th Street SE. Coordinate with Auburn Parks Department and King County Packs Progress Summary. Impact on Operating Budget Once Completed: a Not scheduled for completion until after 2010. Current Year Budget: 2005 YTDActuai Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: 2004 YE _ 2005 Year End Total Project Prior to 2004 Estimate 2005 Budget Protect Tota! Cast Funding Sources: Unrestricted Street Revenue Grants - - _ _ 450.000 Rev -Other - _ _ _ 280.000 Impact Fees Total Funding sources: 730,050 Expenditures: Design _ _ _ _ 150.000 Right of Way - - - _ _ Construction 580,000 Total Expenditure: 730.000 Forecasted Project Cost: 2006 2007 2008 2009 2010 - - Total Exptaaikuis Funding Sources 2005.2010 Beyond 2010 Unmstdcted Street Revenue _ _ _ Grants _ _ _ 120,OOD 330.000 450.000 ... - Rev -Other _ _ _ 30.000 150.000 180.000 100.000 Impact Fess Total Fundin Spurges: 150.000 480.000 030.000 100.000 Expeml0urss: Design. - - - 150.000 .. 150.000 - - Right of Way construction - 480.000 480,000 100,000 Total Ex 150 480 000 630,000 100.000 158 11 11 L� i 0 City ofAubum Capital Facilities Plan CAPITAL FAC UITES-PLAN Project Title: Green River Trail, Phase 3 Project No: Project Type: Non -Motorized Trail Project Manager: TBD Description: A , _ -.. _- ,,,.. s Design and constructexlass-1 NoMulobr¢ed-Trail from 4th SSE to SR 18. Coordinate with Auburn Parte Department and King County Parks. ... .. �.' ... Progress Summary: - t Impact on Operating Budget Once Completed: Not scheduled far completion . until aft 2610. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity., 2004 YE 2005 Year End Total Project Prior to 2 Estima a 2005 Budoet Project Total Cost Funding sources: Unrestricted Street Revenue Grants - _ _ 575,000 Bond Proceeds - - - - 150,000 impact Fees Total Fundingsources: 725,000 Ex ntlifures: Design - - - - 725,000 Right of Way Construction - - - Total Ex nditure: 725 000 Forecasted Project Cost: 2006 2007 2006 2009 2010 Tota : EarpwWd me . Funding sources: 2005.4010 Beyond 2010:.: unresotrretl street Revenue Grants - - - - Bond Proceeds - - - - hn act Fees - 30.000 30,000 575,000 - 120.000 . Tota Funding Sources: - 30.000 30.000 6051000 Exoendhures: Design _ _ _ _ Right of Way _ _ _ _ 30.000 - 30,000 - - '- 005,000 construction Tota re: 30MO ^m 6&5000 159 City of Aubum Capital Facilities Plan 0 CAP1TALFAC%L►T►ES PLAN P= Project Title: A Street SE - Class 2 (Transit Center to Ellingson along BNSF) Project No: Project Type: Non -Capacity (Non -Motorized) Project Manager: TBD Description: Feasibility study for the design and 3ims" ctial of a Class 2 pedestrian Ira the Transit Center from.A Street SW to A Street SE and along A Street SE to Ellingson Road along the: S ' sof way.. Progress Summary: Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $3,696 Current Year Budget: 2005 Y7D Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End Total Project Prior to 2000 Estimate 2005 Buda et Project Total Cost Fund/n Sources: Unrestricted Street Revenue Grants - - - _ _ Other - - - - 75,000 Impact Fees Total Funding Sources: 75,000 Expenditures: Design - - - - 75,000 Right or Way - - - Construction Total Expenditure: 75,000 Forecasted Project Cost: 2000 2007 2008 2009 2010 Total Expenditure Fumft Sotm:es: 200-2010 Beyond 2010 Unrestricted Street Revenue ... _Gran other - - 75.000 _ _ ]5,000 Mood Fees Total Fundhp So - - 75,000 75.000 Extxndhures: Design - - 75,000 _ _ 75,000 . Right or Way - - construction Tatar Ex !furs: - 75,000 75,000 is ME 0 City of Auburn Capital Facilities Plan CAPITAL. FAuLmEs PIAN Project Title: A Street SE Pedestrian Improvement Project No: Project Type: Non -Capacity (Non -Motorized) Project Manager. TBD Description: Design and oonstructoadestrain path on West side of A Stl r under rar7road bridge on BNSF property tD bypass existing stairs and create an ADAaccessbdelravel path. Progress Summary: Impact on Operating Budget Once Completed: Thisprojectwillhave no impact on the operating budget for street maintenance. - Current Year Budget 2005 YTD Actual Budget Budget ExWolitums Balance Adopted Budget BudgetAmendmems Adjusted Budget Activity: 2001 YE 2005 Year End Total Project Prior to 2001 estimste 2005 Budoet Proiect Total Cost Funding sources: Unrestricted street Revenue - - - 63,000 Grants - - - - 150,000 Bond Proceeds -impact Fees Total Funding Sources: 193,000 Expenditures: Design - - 55.000 Right of Way - Construction 130 000 Total Elrendlture: 193,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toth -. Expenditure FwMf Sonresa: 2008.2010 Beyond 2010 UmaaMeted Street Rauarwa - - 13.000 - - 43.= .. Grants - - Bond Ptoceeds _ 150,000 - _ 160,000 ... _ Impact Fees _ . Total 'Funding Sources: 193,000 193,000 Ex0and0ures: Design - - 55.000 - - 60,000 Riwof Way _ _ _ _ ConstrucBon 136.000 138,000 -. Total 193.000 193AN 161 City of Aubum Capital Facilities Plan CAPIATl 2020 Project Title: Kersey Way Trail Project No: Project Type: Study Project Manager: TBD Description: Feasibility study for design and coru§ucfion of a NonMotorized Equestrian ` - ible trail abng Kersey Way to connect R Street SE, the Studs River°Horse Trail and the Lakeland Hills ne non-rnotor¢ed pais.,,=- Progress Summary: ; Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $1,6110. r ` Current Year Budget: 2005 YTDActual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Price to 2004 Estimate 2005 Budget Project TO Cost Funding Sources: Uniestdcted Street Revenue - - 40,000 40.000 40,000 Grants - _ _ OtherImpact Fees Total Funding Sources: 40,000 40,000 40,000 Ex nditums: Design - - 40,000 40,000 40.000 Right of Way - - - _ _ Constnrctfon Total Expenditure: 40,000 40,000 40,000 Forecasted Project Cost 2005 2007 2008 2009 Futrw "sources: 2010 Toth 2005-2010 Eapenmfum Beyond 2010 unres0sted sheer .. Raavnue - - - - - 40"D Grants Omer Impact Fees - Total Funding Soumvs: 40AN Erpendituns: Design 40A00 Right of Way...:..:. - - - Consnuetlon - Totaf 40,000 162 0 0 0 E 0 0 City of Aubum Capital Facilities Plan CAKW:F44CIU' MS- PiL44 Project Title: 15th Street SW Reconstruction (C Street SW to UPRR) Project No: Project Type: Access Management/Pavement Preservation Project Manager. TBD Description: V,a- Rehabilitate 15th Street -SW between V Street SW and the Un p7ic Ralimed. The project we also construct landscaped medians which will continue: the acass manage _ t that is currently West of the Union Pacific - Railroad Tracks. Progress Summary: A Public Works Trust Fund Loan for $540 K is anticipated in 200612007. Impact on Operating Budget Once Completed: This project will have no Wripact on the operating budget for street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Proja" Prior to 2004 Estimate 2005 Budget Funtlin Sources: PBlecl totel Unrestricted Street Revenue - - _ _ Grants _ _ _ 2.160.000 Public Works Trust Fund - - _ _ 540.000 Impact Fees Total Funding Sources: 2,700,000 Expenditures: Design - _ _ _ 450.000 Right or Way Construclion - 2250.000 Total Expenditure: 2,700 000 Forecasted Project Cost. 21146 2007 2006 2009 2010 Tom re -. Funcilm source: 2005-2010 Beyond 2010' Unreobkted Sbeel Revenue Grants 360.000 1.600,000 - _ 2,160,000 PubBc Waft Imst Fund 90,000 450.000 _ 640,000 .. knowfFbas Total Funding sources: 450,000 2,250,000 2,700,000 Design 450.000 _ _ 450,000 Rightor Way Consbucson 1100 _ sp ppp Toed 450,0002,250000 700000 163 City ofAubum Capital Facilities Plan CAPITAL.FACILITIES PLAN- . Project Title: 37th Street $ErR' Street Connector Project No: Project Type: Class 1 Trail Project Manager: TBD Description:" t - eu ThisProjectusingewsfing ROW ect 37th Street to 7r Street SE Wth Class 1 Tral - - Progress Summary Thisect is a' proj good pndidate for a�Safe Walking Route grant Impact on Operating Budget Once Completed The annual maintenance cost for ells project is estimated to be 5151 Current Year Budget: 2005 YTDAetual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments _ Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2000 Estimate 2005 Sudoet Prolect Total Cost Funtlin Sources: Unrestricted Street Revenue - Grants - - - - .50,E Other _ _ - 12.600 Im act Fees _ Total Funtlin Sourres: 63 Expenditures: ,000 Design _ _ - 13.000 Right or Way - construction - 50,000 Total E r endlture: 63.000 Forecasted Project Cost: _. 2606 2007 zoos 2009 2010 Total Expenituri-- wndl sources: 2005-2010 2010 Umesbkted Street - —Barond -. Grants _ 50.400- _ 60+600 ... ,'.. Off/ 12.600 - _ 12,60D hn Faas _ Total Fundlrp sources: 63,000 63.000 E+pendhures: Design - 13.000 - _ .. '�� Right of My - _ _ _ - _ C.onstructIon':.-. 000 _ 000 Total 63 000 63 000 164 0 City of Auburn Capital Facilities Plan CAPITAL FACILMES PLAN 20052010 Project 77t1e: Temporary Re -Open of Academy Drive PHASE 1 Project No: Project Type: Emergency Access Project Manager: TBD yrrofp0jemy Drjde between SR 164 and Fm�valleyRoad fEmeigencyAceess OMy. , Progress Summary: A geotechnical a" was initiated in 2004. The project feasibility, scope and cost will be determined upon completion of the study. The figure here represents a best estimate given available information. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $6,808. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Bahnce Adopted Budget - Budget Amendments Adjusted Budget ACIlvity: 2004 YE 2005 Year End Total Project Prior to 1001 Estimate 2005 Budge Project Total Cost Funding Sources: Unrestricted Street Revenue - _ _ _ _ Grants - _ _ _ 450.000 Other _ _ _ _ 50.000 Impact Fees Total Funding sources: 500,000 Expenditures: Design - - 50,000 Right of Way - - _ _ _ Construction - 450,000 Total Expenditure: 5001000 Forecasted Project Cost. 2005 2007 2008 2009 2010 Totsi ExpendMne Fundi Sources: aDO.4010}..: s Beyorld 2010 Unrestricted swot Revenue _ Grants 450,000 _ _ _ _ 450,000 other 50.000 hr Fees Total Funding Sources: 500,000 500,000 Expentlhures: - Design 50.000 _ _ _ 50,008. Right or Way _ _ Construcflon450.000 450,000 total Ex gore: 500,000 5001000 165 TABLE T - 3 City of Auburn Capital Facilities Plan IMPACT ON FUTURE OPERATING BUDGETS TRANSPORTATION CITY OF AUBURN F L� 0 11 Capital 2006 2007 2008 2009 2010 2011 Total 1 C1006: 3rd Street SE/ 'Cross 1,757 1,757 1,757 1,757 1,757 1,757 10,542 Street SE - S. Division to Auburn Way south 2 C222A: S 277th - AWN to Green - - - - - 10,541 10,541 River Bridge 3 C207A: 'A Street NW - 3rd 17,568 17,568 35,136 Street NW to 14th Street NW 4 C201A: 'M' Street SE - BNSF _ grade separation 5 C326A: C St SW Elingson Road 22,838 22,838 22,838 22,838 22,838 22,838 137,028 to 15th St SW 6 C415A: ' 1' Street NE Corridor - - - 17,568 17,568 17,568 52,704 7 PR529F: 'A' Street Loop 851 851 851 851 851 851 5,106 8 C307A Citywide ITS Project - 5,000 5,000 5,000 5,000 5,000 25,000 9 C41 1A Re -open Academy Drive - - - - - 6,808 6,808 10 A Street NW, Phase 2 (West - - _ - Main Street to 3rd Street NW) 11 C Street NW (Main Street to 3rd - - Street NW) 12 D Street NW (37th Street NW to - - _ _ _ 44th Street NW) 13 F Street SE (4th Street SE to - - 851 851 851 2,553 Auburn Way South) 14 M Street NE (E Main Street to 8th - - 3,513 3,513 Street NE) 15 Realign SR48 EB Ramp at AWS, - _ Grade Separate BNSF Yard 16 Harvey and 8th Street NE - - 703 703 703 2,109 Intersection Improvements 17 C205A: Kersey Way-Oravetz 5,643 5,643 5,643 5,643 5,643 28,215 Road Signal F L� 0 11 I• It City of Aubum Capital Facilities Plan 167 Capital Projects 20011 2007 20M 2009 2010 2011 Total 18 C219A: Lea Hill Slide Slope/105th Street Repair 19 C41 DA: S277th-AWN to - - - - - - Frontage Rd. Wetland Mitigation 20 C315A Downtown Lighting Program 21 C229A: BNSF/East Valley Hwy - - 420 420 420 420 1,680 Pedestrian Underpass 22 Annual Arterial Pavement - - - - - _ - Preservation 23 TIP 32- Citywide Pedestrian Crossing Program 24 Citywide Roadway Safety Infrastucture Improvements 25 C322A: West Main Street - - - - - _ Streetscape 26 C302B West Valley Hwy 840 840 840 840 840 840 5,040 Pedestrian Facilities 27 C1014: Auburn Way South - - - _ _ _ - Safety Improvements 28 TIP 17-M St SE (37th/ 29th) - - - _ _ _ _ Design Study 29 Aubum/Pacific Trail (C Street - 2,688 2,688 2,688 2,688 2,688 13,440 SW) 30 Urban Area TSM Improvements - - - _ _ _ - 31 White River Trail Extension - - 168 168 168 168 672 32 Auburn Black Diamond Non 1,260 1,260 1,260 1,260 1,260 1,260 7,560 Motorized Class I Trail 33 C409A: Auburn Way Corridor - - - _ _ _ _ Pedestrian Study 34 Green River Trail, Phase 1 - - - 2,856 2,856 2,856 8,568 35 Green River Trail, Phase 2 - - - _ _ _ 36 Green River Trail, Phase 3 - - - _ - _ 37 A Street SE -Class 2 (Transit - - - 3,696 3,696 3,696 11,088 Center to Ellingson along BNSF) 167 City of Aubum Capital Facilities Plan 168 0 0 0 Capital Proleets , 2006 ', 2007 2008 - . ` 2009 - 2010 ,° 2011 Total 38 A Street SE Pedestrian Improvement 39 Kersey Way Trail - 1,680 1,680 3,360 40 15th Street SW Reconstruction - - - - - _ (C Street SW to UPRR) 41 37th Street SE/R Street - - 151 151 151 151 604 Connector 42 Temporary Re -Open of Academy - 6,808 6,808 6,808 6,808 6,808 34,040 Drive Phase 1 " Total 27,546 47,685 48,424 74,098 93,346 114,208 405,307 168 0 0 0 City of Auburn Capital Facilities Plan iWATER Current Facilities 0 The City of Auburn water utility provides water supply, treatment, transmission, storage, distribution, and service connections to both in -City residences, and an approximately 10 square mile potential annexation area adjacent to the City. The water system consists of wells and springs for source, chlorinating stations and aeration for treatment, pump stations and pipelines for transmission, and steel and concrete enclosed reservoirs for storage. Table W-1, "Facilities Inventory", lists the facilities along with their current capacities and approximate locations. Level of Service (LOS) The City's Comprehensive Water Plan summarizes the design criteria for the City's water distribution system. Capital Facilities Projects and Financing The City of Auburn's water system anticipates 6 capacity projects in the amount of $4,246,000, and 11 non -capacity projects totaling $8,487,000, for a 6 -year planning expectation total of $12,733,000. The financing plan is shown in Table W-2 followed by individual worksheets showing the project details. The capacity projects will increase water supply quantities, storage, and distribution for growth of retail customers. The non -capacity projects will provide for pipeline improvements and replacements, delivery pressure improvements, comprehensive and resource management planning, pump station upgrades, telemetry system improvements, and meter upgrades. Impact on Future Operating Budgets As Table W-3 shows, operating budget impacts of $89,200 are forecasted for water supply and distribution facilities during the six years 2006 — 2011. 169 TABLE W-1 FACILITY Water Supply Algona Well Coal Creek Springs West Hill Springs Well 1 Well 2 Well 3A Well 3B Well 4 Well 5 Well 5A Well 5B Well 6 Well 7 Supply Total (MGD) City of Auburn Capital Facilities Plan FACILITIES INVENTORY WATER SYSTEM iCITY OF AUBURN WATER SYSTEM Certificate 857 Claim (1973 File Date) Certificate 3560-A G1-00277 C G1-23629 C Included Above G1-20391 C G1-23633 C G1-25518 P (Supplemental to Wells 5 & 5A) (Supplemental to Wells 1, 2, 3A, 3B, 4) (Supplemental to Wells 1, 2, 3A, 3B, 4) CAPACITY :D - max r 0.72 9.70 <2.52>' 0.90 3.17 3.46 4.03 Included Above 4.03 1.44 0.24 1.68 (supplemental) 5.04 (supplemental) 5.04 (supplemental) 26.97 24.45 Washington Blvd and 3rd Ave S, Algona 3401 Stuck River Dr 1900 - 15th St NW ext. 1130 "M" St SE 519 "K" St NE 401- 37th St SE 401- 37th St SE 950 25th Street SE 5530 James Ave SE 5401 Evergreen Way West end of 62nd Ct SE 519 "K" St NE 403 "E" St NE *Denotes deduction of 1,750 gpm (Qi/2,824 ac-ft/yr to comply with the provisions of the Muckleshoot-Auburn Stipulated Aareement. FACILITY Storage Facilities Valley Reservoir 1 Valley Reservoir 2 Academy Reservoir 1 Academy Reservoir 2 Lea Hill Reservoir 1 Lea Hill Reservoir 2 Lakeland Hills Reservoir I Storage MG Total CAPACITY 5.0 3.6 1.0 1.5 1.0 1.5 1.0 14.6 2004 Auburn Way S 32115 - 105th Place S 5002 Auburn Way S 5002 Auburn Way S 30502 - 132nd Ave SE 30502 - 132nd Ave SE 1 1 18 571h Place SE 170 SERVICE AREA Valley Service Area Valley Service Area Academy Service Area Academy Service Area Lea Hill Service Area Lea Hill Service Area Lakeland Hills Svc Area 11 E Pi City of Aubum Capital Facilities Plan TABLE W-1 (continued) FACILITIES INVENTORY WATER SYSTEM -' �> 1CAPACRTf . - ~' FACILITY` ' . -� a GPM '- 'LOCATION Booster Pumn Stations Academy: 4 pumps 2,300 2004 Auburn Way S Green River: 4 pumps 4,680 29621 Green River Rd Academy Intertie: 7 pumps 4,830 30502 132nd Ave SE Lea Hill: 3 pumps 2,000 10406 Lea Hill Rd SE Lakeland Hills: 6 pumps 3,000 1118 57th Place SE Jannsen's Addition: 1 pump 100 3600 Bock Lemon Tree Lane - Game Farm Park: 2 pumps 1,060 2401 Stuck River Drive CAPACITY FACILITY .__H raulic Grade LOCATION aux I downs(ream In feet Pressure Reducina Stations Serves Valley Pressure Zone: Control Valve 1 264 Howard Road Control Valve By -Pass 264 Howard Road (Bypass) Well 4 By -Pass 257 25th Street SE Serves Hemlock: Dogwood North 431 Dogwood St. SE & Auburn Way S. Hemlock 443 Auburn Way S. & Hemlock St. SE Serves Fir: Dogwood South 470 Dogwood St. SE & Auburn Way S. Fir 470 Auburn Way S. West of Fir St. SE Chinook Elementary School 457 Auburn Way S. at Chinook Elementary Serves Clearwater Apartments: Clearwater Apts. North 470 AWS (Clearwater Apt. Connector) Clearwater Apts. South 471 AWS (Clearwater Apt. S. Connector) Poplar Street 484 AWS & Poplar St. River Walk 373 27th St. SE & 27th Place SE Serves Lea Hill: Lea Hill 500 500 304th St. SE West of 1 12th Ave. Lea Hill 462 462 SE 298th Place & 109 Ave. SE Lea Hill 406 406 304th St. SE West of 108th Ave. Lea Hill 40 1 -1 401 Lea Hill Rd. S.E. Lea Hill 401-2 401 Lea Hill Rd. & 106 Place Lea Hill 415 415 Lea Hill Rd. & 107 Place Lea Hill 299 299 104th Ave SE (South of 303rd Road) Lea Hill 173 173 SE 3041h Place & SE 101st Place Reservoir Apts. North 425 105th Place SE & 320th place Reservoir Apts. South 1 395 1105th Place SE Near Reservoir 2 171 City of Auburn Capital Facilities Plan TABLE W-1 (continued) FACILITIES INVENTORY WATER SYSTEM BRAUNWOOD SATELLITE WATER SYSTEM ^„ 6 MCP "- "URNWATERSY.STEM(coMlnuedj .::. CAPACITY CAPACITY Water Supply Braunwood Satellite #1 0.03 MGD Hydraulic Grade Storage Facilities Braunwood Satellite 1 FACILITY downstream in feet LOCATION Pressure Reducina Stations 640 Nathan Avenue & 49th Street Lakeland Hills Zone 1 Lake Hills Connection 243 Oravetz Road @ Mill Pond Drive Lakeland Hills Zone 3 545 51 st St. SE east of cul-de-sac Lakeland Hills Zone 3 547 Lakeland Hills Way. & Mill Pond Dr. Lakeland Hills Zone 3 624 Evergreen Way & Lakeland Hills Way Lakeland Hills Zone 2 401 Lakeland Hills Way & 47th SE Lakeland Hills Zone 2 390 Mill Pond Dr. & Mill Pond Loop Lakeland Hills Zone 2 659 Quincy Ave N of 53rd St SE Lakeland Hills Zone 1 242 Lakeland Hills Way & Oravetz FACILITY CAPACITY-- _ LOCATION - Treatment Coal Creek CCTF 4,600 GPM 2104 Howard Street Fulmer Field CCTF 9,600 GPM 1 1 13 5th St NE Chlorination Stations Coal Creek Springs Station 2,400 GPM 3401 Stuck River Drive (gravity feed) West Hill Springs Station 625 GPM 1900 15th Street NW (gravity feed) Well 4 950 25th Street SE Well 513 600 GPM I West end of 62nd Ct SE BRAUNWOOD SATELLITE WATER SYSTEM FACILITY CAPACITY LOCATION Water Supply Braunwood Satellite #1 0.03 MGD 4501 47" St SE Storage Facilities Braunwood Satellite 1 0.03 MG 4501 47" St SE Booster Pump Stations Braunwood: 3 Pumps 2.0 GPM 4501 47`h St SE 172 Ll i i E i City of Aubum Capital Facilities Plan TABLE W-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING . WATER DMSIOH . COSTS/REVENUES 2005 2006 2007 2008 2009 2010 TOTAL 1 DS -116-809 Cross Street Pipeline'Constructlon (C100 Cost 136,000 136,000 Rev - Water Fund 136,000 136,000 2 Well 5S Construction (C324A) ` Cost 1,100,000 1,100,000 Rev - Water Fund 1,100,000 1,100,000 3 Lea Hill Intertle Pump Station Booster PumpPackage (430M) 150,000 Cost 100,000 100,000 Rev - Water fund 100,000 100,000 4 Lakeland Hills West Supply Pump Station .. Non -Capacity Projects: Cost - 150,000 1,000,000 1,150,000 Rev - Water Fund - 150,000 1,000,000 1,150,000 5 Lea Hill Booster Pump Station Cost - - - 160,000 1,100,000 - 1,260,000 Rev - Water Fund - - - 160,000 - - 160,000 Rev - PWTF - 1 100 000 - 1 100 000 6 Lakeland Hills High Zone Reservoir Construction Cost - 500,000 500,000 Rev - Water Fund - 500,000 500,000 Subtotal 1,336,000 150,000 1,000,000 160,000 1,100,000 500,000 4,246,000 Non -Capacity Projects: 7 PR -201 Annual Replacements (430A) .. Cost 1,000,000 1,000,000 1,100,000 1,100,000 1,100,000 1,200,000 6,500,000 Rev - Water Fund 1,000,000 1,000,000 1,100,000 1,100,000 1,100,000 1,200,000 6,500,000 6 SCADA Upgrades (430J) (pending control systems reprograming study) Cost 50,000 52,000 53,000 55,000 56,000 58,000 324,000 Rev - Water Fund 50,000 52,000 53,000 55,000 56,000 58,000 324,000 9 Water Resources Protection Program (C1013) Cost 15,000 15,000 16,000 16,000 17,000 17,000 96,000 Rev- Water Fund 15,000 15,000 16,000 16,000 17,000 17,000 96,000 10 PZ -101 Academy Service Area Rezone (C8036) Cost 150,000 - - - - 150,000 Rev - Water Fund 150,000 150,000 173 City of Auburn Capital Facilities Plan COSTSIREVENUES 2005 2006 2007 2008 2009 2010 TOTAL 11 Vulnerability Assessment Reccomendations (430K) - Cost 50,000 50,000 Rev - Water Fund 50,000 50,000 12 Well 4 Emergency Power (430L) Cost 130,000 130,000 Rev - Water Fund 130,000 130,000 13 Second Supply Plpelinefineigency Intertle24A) - (C2 „ r Cost 50,000 50,000 Rev - Water Fund 50,000 - 50,000 14 Blow -off Installation on Deadend Mains (430N) Cost 110,000 110,000 Rev - Water Fund 110,000 110,000 Radio Read Meters (4300) h rc„yam M , Cost 25,000 26,000 27,000 27,000 28,000 29,000 162,000 Rev - Water Fund 25,000 26,000 27,000 27,000 28,000 29,000 162,000 Comprehensive Water Plan Cost 250,000 250,000 Rev - Water Fund 250,000 250,000 Lakeland Hills Service Area Rezone Cost 15,000 650,000 Rev - Water Fund 15,000 650,000 665,000 1 665,000 Subtotal 1,595,000 1,743,000 1,446,000 1,198,000 1,201,000 1,304,000 8,487 SUMMARY: COSTS AND REVENUES Sts: Capacity Projects Non -Capacity Project: Total Costs REVENUES: Rev - Water Fund Rev - PWTF Total Revenues BALANCE 1,336,000 150,000 1,000,000 160,000 1,100,000 500,000 4,246,0001 1,595,000 1,743,000 1,446,000 1,198,000 1,201,000 1,304,000 8,487,000 2,931,000 1,893,000 2,446,000 1,358,000 2,301,000 1,804,000 2,931,000 1,893,000 2,931,000 - 1,893,000 2,446,000 1,358,000 2,446,000 1,358,000 174 1,201,000 1,804,000 11,633.000 1,100,000 - 1,100,000 2,301,000 1,804,000 12,733,000 0 9 0 0 0 City of Aubum Capital Facilities Plan -4iCAP/TAE FACILMES PLAN •n!X Project Title: DS -116-609 Cross Street Pipeline Construction Project No: C1006 Project Type: Expansion: Capacity Project Manager: Jennifer Dvorak Description: A- Construct anew &ch pipeline in -.Cross Street irom -SE to AWS. Projectwill be performed in two phases. Phase one win benited to theintersection of Cross ' A St SE Phase two wi8 be determined at a later date. Progress Summary: Impact on Operating Budget Once Completed: This projedwill have no si nficant" ct on the Water operating budge g unpa t. Current Year Budget: 2005 YrD actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding Sources: Unrestricted Water Revenue 13,000 136,000 136,000 285,000 Grants - - - - Bond Proceeds - - Impact Fees Total Funding Sources: 13,000 136,000 136,000 285,000 Expenditures; Design 13,000 - - 13,000 Right of Way - - - Construction 136,000 136,000 272,000 Total Expenditure: 13,000 136,000 136,000 285,000 Forecasted Project Cost. 2008 2067 2068 2009 2010 - Totd- Funding Sources: .. .2005-2010". Unrestricted Water - Revenue _ _ _ _ ..-- IMAM Grants Boma Proceeds - - - Impact Fees Total Funding sources: 136,000 Expenditures: Design Right of Way Construction ToDdExpenditure. I 000 175 City of.Aubum Capital Facilities Plan _ Mai_ CAPITALFA,C/LI.TIES PLAN, s._ ssr Project Title: Well 513 Construction Project No: C324A Project Type: Expansion: Capacity Project Manager: Jennifer Dvorak Description: .. Construct and install a masa-W- well building two ground levels tanks, a treatment facility. a 600 ppm production pump, a skid mouNed'boosterpump packagsand a ted equipment to be used as a supplemental groundwater supplyfor the Lakeland Hills Service Area Progress Summary: Impact on Operating Budget Once Completed: _ Based on the 2004 operating budget for -the Water Division; the annual maintenance cost for this project is estimated to be $10,000. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments _ Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Fundln Sources: Unrestricted Water Revenue - 730,000 1,100,000 1,830,000 Grants _ Bond Proceeds Impact Fees Total Funding sources: 730,000 1,100,000 1,830,000 Expenditures: Design - 230,000 - 230,000 Right or Way _ - _ Construction 500,000 1,100,000 1,600,000 Total Expenditure: 730,000 11100,000 1,630,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Fundln Sources: 2005.2010 Unresh/cted Water Revenue _ _ _ 1.100,000 Grants Bond Proceeds . knpact Fees Total Funding sources: 11100,000 Expenditures: _ Doslgn Right of Way - - construction 11100,000 TotalExpenditure; 1,100000 176 0 0 11 E 9 City of Aubum Capital Facilities Plan CANTAGFACILiTiES PIAN_ Project Title: Lea Hill Intertie Pump Station Booster Pump Package Upgrades Project No: 430M Project Type: Expansion: Capacity Project Manager: Tim Osborne, P.E. Description: The existing boostirr pump padcagerapadlyis and for the current area and needs to be upgrade to serve future developmentswithin that area. The project co of removing and replacing the existing booster pump skid and replacing it with a new skid with -variable frequen ow: motor heads to meet the maximum day demand plus fire Progress Summary. Impact on Operating Budget Once`Completed: ` -~ This project will have no significantimpacton the Water"tXviaon's operating budget. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. - 2001 YE 2005 Year End Prior to 2001 Estimate 2005 Budget Protect Total Funding Sources: Unrestricted Water Revenue - - 100,000 100,000 Grants - - - Bond Proceeds - - impact Fees Total Funding Sources: 100,000 100,000 Expenditures: Design - 10.000 10,000 Right of Way - - - - construction 90.000 90,000 Total Expenditure: 100,000 100,000 Forecasted Project Cost: 2006 2007 200E 2009 2010 Total Funding Sourees: - 2005-2010 Unrestricted Water Revenue _ _ _ 100.000 Grants Bond Procwatr impact Fees Total Funding sources. 100.000 Expenditures: - Design - - - - - 10,000 Right Of Way 'construction - 90000 Total Ex dirum- 100,000 W&A City of Aubum Capital Facilities Plan � , VAPITAI:_ F_ ,ACIUTIES PLAN Project Title: Lakeland Hills West Supply Pump Station Project No: C0020 Project Type: Expansion - Capacity Project Manager: TBD Description: :•"-. This booster pump is locatiO along the East Valley Highway n Street East The pump station would be designed to have a three cari.pump configuration with a cape ' 500-gpm each. Progress Summary: Impact on Operating Budget Once Completed: This project will increase the power costs and will requireroutine insprctions. "Based on the 2004 operating budget for the Water Division, the annual maintenance cost for this project is estimated to be $10,000. Current Year Budget. 2005 YTD actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: - 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Proiect Total Funding Sources: Unrestricted Water Revenue - Grants - - - Bond Proceeds - - - Impact Fees Total Funding Sources: Expenditures: Design - - Right or Way Construction Total Expenditure: - Forecasted Project Cost: " 2008 2007 2008 2009 2010 TOW Fundina Sources: 2005-2010 Unrestricted Water . - Revenue 150,000 1,000,000 - - .... 1.150.000 Grants - - _ Bond Proceeds Impact Fe" - TOW Funding sources: 150,000 11000,000 1,150,000 Exuendhures: Design 150,000 - - - .. - 150,000 .:' Right of Way -- Consfrec0on - 1,000,000 1000,000 ToW nditure: 150,000 1,000,0001,150,000 178 9 0 11 City of Auburn Capital Facilities Plan ,CAPITAL FACILMES PLAN' Project Title: Lea Hill Booster Pump Station Project No: C9020 Project Type: Expansion - Capacity Project Manager: TBD Description: Increase the pumping capacity to provide the Ma4mu Demand for the Lea Hill Service Area. Required to minimize the storagerequired in the Lea Hill Service d to meet future MDD. Progress Summary: Impact on Operating Budget Once Completed: . This project vAll have no significant impact on the Water Division's operating budget since this pumping station replaces an epsting booster pumping station.— Current Current Year Budget., 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2001 YE 2005 Year End Prior to 2001 Estimate 2005 Budget Proieet Total Funding Sources: Unrestricted Water Revenue - - - - Grants Bond Proceeds - - - PWTF Total Funding Sources: Expenditures: Design - - - - Right o/Way - - - Construction Total Expenditure: Forecasted Project Cost: 2006 2007 2008 2009 2010 .. Torr Funding sources: 20M-2010 unrestricted Water Revenue - - 160.000 - - .. 100,000 PWrF - - - 1,100.000 - "_:.1,100,000 Bond Proceeds PWrF .... ,. Total Fimiding sources: 160,000 1,100,000 1,260,000 Expenditures: .. Design - - - 160.000 -. - ;:' 160,000 Right of Way _ Construction - -' 1 700.000 .. - 1100... Total iture: 160,000 1,100,000 1 000 179 City of Aubum Capital Facilities Plan CAPiTALFACIU77ES:PLAN 2010 t Project Title: Lakeland Hills High Zone Reservoir Construction Project No: 430Q Project Type: Expansion: Capacity Project Manager. TBD Description:, 4i Construct anew total cepa' of 2.65 million gallon reserwim of land next to Francis Court SE cult -tie -sac in the Lakeland Hills Service Progress Summary: Impact on -Operating Budget Once=Completed. -- -- _ This project will require routine inspections by water operations staff.The annual maintenance cost is estimated to be Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget - Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Total Funding sources: Unrestricted Water Revenue - - - - Grants - - - Bond Proceeds - - - Impact Fees Total Funding Sources: Expenditures: Design - - - Right ofWay - - - - Construction Total Expenditure: Forecasted Project Cost: . 2006 2007 2008 2009 _. 2040 Total Funding Sources: 2005-2040 Unrestricted Water - - - Revenue - - _ 500,000 500,000 Grants - - - `.. Bond Proceeds - - - - - Impact Fees - - Total Funding Somme: 500.000 500.000 EAVendftures: Design - - -:.. .,..Right -... - 500.000 500.000 of Way - - - - - ,' Construction Total Eu re: 500,000 500 000 ff-Tr' 0 0 9 0 City of Auburn Capital Facilities Plan i =<CAP_/TAL- ACILIf/ES"PLAN Project Title: PR -201 Annual Replacements Project No: 430A Project Type: Repairs & Replacements: Non -Capacity Project Manager: Varies Description: Funding for lines will be set aside replacing water as predeterrwm by the Water Ublity. Projects coordinated with the local streetprogranfand otherutift— Projadt'- Progress Summary: Impact on Operating Budget -Once Completed: This project will have no significant impact on the Water Division's operating budget Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budpet Proiect Total Funding sources: Unrestricted Water Revenue 100,000 100,000 1,000,000 1,200,000 Grants - - - - Bond Proceeds - - Impact Fees Total Funding Sources: 100,000 100,000 1,000,000 1,200,000 Expenditures: Design 10,000 10,000 100,000 120,000 Right or Way - - - Construction 90,000 90,000 900,000 1,080,000 Total Expenditure: 100,000 100,000 1,000,000 1,200,000 Forecasted Project Cost: ....2010 2006 2007 2008 2099 -Fold Funding Sources: 2005-2010'. Unrestricted Water Revenue 1,000,000 11100,000 1,100,000 1,100,000 1,200,000 61500,000 Grants - Bond Proceedsimpact Fees Total Funding Sources: 1,000,000 1,100,000 1,100,000 1,100,000 1,200,000 - 6,500,000 Expenditures: Design 100.000 - 110,000 110,000 110,000 - 120,000 650,000 Right or Way -- - - constructlon 900.000 990000 990.000 .990,000 1080,000 00 500 Total ExpandItum. 1 000 000 1,100,000 1,100 000 1,100,000 1 000 time 800 181 City ofAubum Capital Facilities Plan Description:; . ­.--CAPTAL FACILME& PIAN telemetry system, based on.an independent SCADA Assessme tudy and the vulnerability study. Project Title: SCADA Upgrades (Pending Control System Reprograming Study) Project No: 430J Project Type: Improvements: Non -Capacity Project Manager: Gary McConnell/Ken Haines Description:; . There maybe required Supb isory Control and Data AcquisitiCADA) upgrades to the epsting water utility telemetry system, based on.an independent SCADA Assessme tudy and the vulnerability study. Progress Summary: Impact on Operating Budget Once Completed: This project will have no significant impact on the Water Divisions' operating budget Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2001 Estimate 2005 Budoet Proiect Total Funding sources: Unrestricted Water Revenue - 50,000 50,000 100,000 Grants - - - - Bond Proceeds - Impact Fees Total Funding sources: - 50,000 50,000 100,000 Expenditures: Design - - - _ Right of Way - - _ Construction 50.000 50.000 100,000 Total Expenditure: 50,000 50,000 100.000 Forecasted Project Cost 2006 2007 2008 2009 2010 Total Funding sources: 2005 - 2010 Unrestricted Watar Revenue 52,000 53,000 55,000 56,000 58,000 324,000- Grant - _ - _ Bond Proceeds knpact Fees Tutsi FurMln sources: 52,000 53,000 55,000 56,000 58,000 324,000 Exoanditures: -Design ' Right of Way - _ _ Conatrtieflon 52 000 53 000 55,000 56 000 58,000 ..; 324.000 Total Expenditure, 52,000 53,000 55,000 000 58,000 000 182 Il 0 0 0 i City of Auburn Capital Facilities Plan C.9P�TAL FAC1LMES PLAN Project Title: Water Resources Protection Program Project No: C1013 Project Type: Improvements: Non -Capacity Project Manager: Chris Thom Description: Water Resource Piotection Program will identifyp azards, identify actions and program to protectpe:atys'water resources. .. begin the implementation Progress Summary: - Proceeding to incorporate the water resource protection areas into the sensitive areas ordinance. Next step will be the implementation of program recommendations.: Impact on Operating Budget;Once-Completed:' .. This project will have no significant impact on the Water Division's operating budget. . Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity., 2006 YE 2005 Year End Prior to 2006 Estimate 2005 Budaet Project Total Funding sources: Unrestricted Water Revenue - 15,000 15,000 Grants - - - - Bond Proceeds - - Impact Fees Total Funding sources: 15,000 15,000 Expenditures: Design - - Right or Way - - - - Construction 15,000 15,000 Total Expenditure: 15,000 15,000 Forecasted Project Cost: . 2006 2007 2008 2009 2010 ...,' Tool Funding Sources: _. ......_ MOB -2010-': Unrestricted Water Revenue 15,000 16,000 16.000 17,000 17,000 - - 96,000 Grants- BaMProceeds Impact Fees .. Total Funding Sources: 15,000 16A00 16,000 17,000 17,000 96,000 Emend itures: Design - Right olWay _ -Construction 15 000 16,000 16,000 17,000 - 17.000 91LOOO. Total Expenditure: 15,O00 16AW ie 000 17,000 17,000 - 000 183 City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN Project Title: PZ -101 Academy Service Area Rezone Project No: C8036 Project Type: Improvements: Non -Capacity Project Manager: Scott Nutter Description: Constuct two new pressurere�i= ting statansio'create a new p -zone which currently exist. — to replace the exisbrg individual zones Progress Summary. Impact onOperating Budget Once Completed:; The decrease in the number of pressure reducing stations should lower the annual"operatings costs by about $2,000. Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2001 Estimate 2005 Budoet Proiect Total Funding sources: Unrestricted Water Revenue 27,000 2,000 150,000 179,000 Grants - - _ Bond Proceeds Impact Pass Total Funding Sources: 27,000 2,000 150,000 179,000 Expenditures: Design 27,000 2,000 24,000 53,000 Right of Way - _ _ construction 126,000 126,000 Total Expenditure: 27,000 2,000 150,000 179,000 Forecasted Project Cost: - 2005 2007 20M 2009 - 2010 Total Fkindfng sources: 2005-2090 Unreshkted Water - Revenue _ _ _ - Grants- _ _ 150,000 BondProceeds Inmed Fees - Total Funding Sources: 150,000 ::ExpendNures: 24.000 --..._. Right of Way.. - C126.0001 TOpI Ex 150 000 184 0 0 City of Aubum Capital Facilities Plan . nxAPITAL FACILITIES PLANT `I Project Title: Vulnerability Assessment Reccomendations Project No: 430K Project Type: Improvements: Non -Capacity Project Manager. TBD Description: There may be,requi rityupgradesto the ebstin r Ry facilities, based on an independent Vulnerability Assessment Study - Progress Summary: Impact on Operating Budget Once' Completed: This project will have to be anaWnd to.caloulate the impact on the Water Divisions' operating budget once a scope is identified. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2001 Estimate 2005 Budget Protect Total Funding Sources: Unrestricted Water Revenue - - 50,000 50,000 Grants - - Bond Proceeds - - - Impact Fees Total Funding sources: 50,000 50,000 Expenditures: Design - - 5.000 5,000 Right or Way - - - - Construction 45,000 45,000 Total Expenditure: 50,000 50,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toed Funding Sources: 2005-2010' Unrestricted Water _. Revonue - - - 50,000 Grants - Bond Proceeds h3wpact Fees Total Funding Sources: $0,000 Ezasoditures: . Design Right o1 Way Construction .. 45.M Total Expenditure, 50 185 City ofAubum-Capital Facilities Plan V CAPITALACILMES:P.LAN ,�2005-7010 Project Title: Well 4 Emergency Power Project No: 430L Project Type: Improvements: Non -Capacity Project Manager: Gary McConnell Description:-- Provide an automatictransfeswitch and an onsiteemerjency tw system to run Well 4 during a power failure. d- Progress Summary: Impact on Operating Budget Once Completed., r This project will have no significant impact on the Water Diviswru? operating budget, but an annual maintenance , agreement will be required and there will be staff time used for routine maintenance.- -. Current Year Budget. 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Project Tota! Funding Sources: Unrestricted Water Revenue - 130.000 130,000 Grants - - - - Bond Proceeds Impact Fees Total Funding Sources: 130,000 130,000 Expenditures: Design - - 30,000 30,000 Right or Way - _ _ - Construction 100,000 100,000 Total Expenditure: 130,000 130,000 Forecasted Project Cost: - 2008 - 2007 2008 2009 2010 Total Funding -Sources: 2008-2010 Unrestricted Water Revenue - _ _ _ _ 130.000 Grants Bond Proceeds - Impact Fees Total Funding Sources: 130,000 E-oandifures: ,D d Way 30,000 Rig- Construction 100,000 Total/tures 130,000 186 11, 0 F--1 L—A City of Aubum Capital Facilities Plan .r n . PWALAACILMESfPLAN Project Title: Second Supply Pipeline Emergency Intertie Project No: C224A Project Type: Improvements: Non -Capacity Project Manager: Tim Osbome, P.E. Description: Construct three nev-mergency inteAte stationswitb A' Supply Pipeline Project. The one interfie will be located in the Lea Hill service area and the othertwo in the valley service area. Progress Summary: Payment to Tacoma for future turnouts from pipefine No.5 Impact on Operating Budget Once Completed:. . This project will have rwsignificant impact aiittre Water Divisron's operating budget as no connection to the pipeline will be made in the near future. - Current Year Budget: 2005 YrD actual Budget Budget Erpenditures Balance Adopted Budget - BudgetAmendments Adjusted Budget Activity: 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Proiect Total Funding Sources: Unrestricted Water Revenue 100,000 50,000 150,000 Grants - - - - Bond Proceeds Impact Fees Total Funding sources: 100,000 50,000 150,000 Expenditures: Design - - - Right ofWay - - - - Construction 100,000 50,000 150,000 Total Expenditure: 100,000 50,000 150,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Funding sources: - 2005.2010 Unrestricted Water Revenue Grants ' - 50.000 Bond Proceeds Impact Fees _. Total Funding sources: 50.000 ExwrWitures: Design Right ofWay Construction 50,000 TotatEiMenditure. 50M WYl City of Auburn Capital Facilities Plan -k ,CAPITAL FACILITIES PLAN =:2005-2010-.'? Project Title: Blow -off Installation on Deadend Mains Project No: 43ON Project Type: Improvements: Non -Capacity Project Manager: Tim Osborne, P.E. Description:" " Identify and install all deadend mains with a blowoff assembly of to improve water quality and fire flow capability via routine flushing program: k; • Progress Summary., Impact on Operating Budget Once Completed.- ompleted:This Thisproject will have no significant impact on the Water Division's operating budget It will require visits by water distribution staff to flush mains as a pan of the dead end main flushing program. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budoet Project Total Fundin Sources: Unrestricted Water Revenue - 110,000 110,000 Grants Bond Proceeds Impact Fees Total Funding sources: 110,000 110,000 Expenditures: Design - 10,000 10,000 Right or Way - _ - _ Construction - .100,000 100,000 Total Expenditure: 110,000 110,000 Forecasted Project Cost: . 2006 2007 2008 2009 2010 Total Fundin sourt:es: 2005-2010 Urtrestdeted Wates Revenue - . 110,em Granb _ - - - Bond Proceeds gn Fep - Total Fundi S80Um M 110,000 Expenditures: Design10.000 ..RWM of construction . 100,000 ToWlExpenditum. - 110,000 188 0 11 0 0 City of Auburn Capital Facilities Plan ,-, "CAPI7:4t:FAMUTIES PLAN 10, Project Project Title: Radio Read Meters Project No: 4300 Project Type: Improvement: Non -Capacity Project Manager: Julie Sharkich Description: For all manual typ water meters that become mah&ing & unable to acauateiy record consumption, a radio read meter will beinstalled. For new installations, thetonstnrction standards will be revised & contractor price increased to require radio read meters. Estimate th 200 per year (depending on meter size) will be changed out. Progress Summary: Impact on Operating Budget Once Completed: This project villi have no significant impactors the Water Division's operating budget , Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance - Adopted Budget - Budget Amendments Adjusted Budget Activity., 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budaef Protect Tofe/ Funding Sources: Unrestricted Water Revenue - - 25,000 25.000 Grants - - - - Bond Proceeds - - - Impact Feas Total Funding Sources: 25,000 25,000 Expenditures: Design .Right or Way - - - - Construction 25,000 25,000 Total Expenditure: 25,000 25,000 Forecasted Project Cost ewe 2007 2008 2009 2010 Total , Funding Sources: 2005-2010 Unrestricted Water Revenue 26,000 27,000 27,000 28,000. 29,000 - 182,000 Grants - _ - _ _ . Bond Proceeds Impact Fess - Total Funding sources: 26.000 21,000 27,000 28,000 29,000 152,000 Expenditures: Design - Right olWay- - - .. ' CorfsOvcdon 26,000 27,000 27.000 28,000 29,000 0 1 00 7oW Ex dltum. 26,000 27,000 27,000 28,000 28,000 "1 Ow 189 City of Auburn Capital Facilities Plan >>. ZAP ITALFACIUTIES_PLAN :2005-2010 Project Title: Comprehensive Water Plan Project No: 430P Project Type: Improvement: Non -Capacity Project Manager: Tim Osborne, P.E. Description Update Comprehensive W r Plan in 2007 as required by Wa Department of Health. JProgress Summary: Impact on Operating Budget Once' Completed: This project will have no significant impact on the Water Divisi s operating budget Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity. 2004 YE 2005 Year End Prior to 2004 Estimate 2005 Budget Proiect Total Funding sources: Unrestricted Water Revenue Grants Bond Proceeds Impact Fees Total Funding sources: Expenditures: Design - Right of Way - Construction Total Expenditure: Forecasted Project Cost.- ost:2006 20062007 2008 2009 2010 Total Funding sources: 200-2010 UnrestrIctod Water Revenue - 250,000 - 250.000 Grants - - Bond Proceeds impact Fees Total Funding sources: 250,000 250.000 Exoendthrres: Design - 250.000 - - - 250.000 Right at Way _ _ Construction Total Expenditure: 250,000 250,000 190 is E 11 Ll C] City of Auburn Capital Facilities Plan CAPITAL. FA CIL MES PLAN T f :,-2003=20.10, = Project Title: Lakeland Hills Service Area Rezone Project No: C8035 Project Type: Improvement: Non -Capacity Project Manager. TBD Description: w Relocate and construct new pressure reducing stations`^install necessary piping and modify booster pump station to �is adjust current pressure zones within the Lakeland Service Area to provide service pressures to customers within the Citys design standards. Progress Summary., Continue technical meetings on the pressure modifications to the area. Impact on Operating Budget Once Completed. _ This projectwill have no significant impact on the Water Division's operating budget. Budget impacts are related - primarily to the routine inspection and repair of the new pressure reducing stations Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments Adjusted Budget Activity: 2000 YE 2005 Year End Prior to 2001 Estimate 2005 Budget Protect TO Funding Sources: Unrestricted Water Revenue - - 15.000 15,000 Grants - - - - Bond Proceeds - - - Impact Fees Total Funding sources: 15,000 15,000 Expenditures; Design - - 2,000 2,060 Right or Way - - - Construction 13.000 13,000 Total Expenditure: 15,000 15,000 Forecasted Project Cost. 2006 2007 206 2609 2010 Total Funding Sources: 2005-2010 Unrestricted Water Revenue 650,000 - . 6651000 Grants Bond Proceeds - - - - - - - impact Fees Total Funding Sources: 650" 665,000 Expenditures: Design - - _ _ _ 2,000 Right of Way - nsWedon 650,000 683.000 Tota(Codhure: 650,000 M.000 77, 77,776 191 I TABLE W-3 City of Aubum Capital Facilities Plan IMPACT ON FUTURE OPERATING BUDGETS WATER CITY OF AUBURN Capital P Projects -2006 2007 2008 "- 2009 '-2010 2011 Total 1 DS -116-809 Cross Street - _ Pipeline Construction ' 2 Well 5B Construction 10,000 10,000 10,000 10,000 10,000 10,000 60,000 3 Lea Hill Intertie PS Booster - - - _ _ _ Pump Package 4 Lakeland Hills West Supply - - 10,000 10,000 10,000 10,000 40,000 Pump Station 5 Lea Hill Booster Pump - - - _ _ _ - Station 6 Lakeland Hills High Zone - - - 1,200 1,200 Reservoir Construction 7 PR -201 Annual - - _ _ _ _ _ Replacements 8 SCADA Upgrades - - - 9 Water Resources Protection - Program 10 PZ -101 Academy Service (2,000) (2,000) (2,000) (2,000) (2,000) (2,000) (12,000) Area Rezone 11 Vulnerability Assessment Recommendations 12 Well 4 Emergency Power 13 Second Supply Pipeline Emergency Intertie 192 it 01 01 r L • City of Aubum Capital Facilities Plan -capital Projects 2W11—:-, 2007:. 2008 2009 :2010 - .3011 Total 14 Blow -oft Installation on - Deadend Mains - 15 Radio Read Meters - - - - - - 16 Comprehensive Water Plan - - - - - - - 17 Lakeland Hills Service Area - - - - - Rezone 193 0 Ll