Memorandum
* WASHINGTON
To: Downtown Redevelopment Committee
From: Elizabeth Chamberlain, AICP, Principal Planner
Ingrid Gaub, P.E., Assistant City Engineer
CC: Cindy Baker, AICP, Planning, Building, and Community Director
Dennis Selle, P.E., City Engineer
Jacob Sweeting, Project Engineer
Date: July 10, 2009
Re: Proposed Pedestrian Lights - Downtown
Background
Staff brought to the Committee for discussion, at the June 9, 2009 meeting,
pedestrian lighting within Downtown as the Main Street Pedestrian Lights are
fatiguing and replacement parts are no longer available as "standard issue" and
require a custom order. Also, timing is a factor as the Aubum Professional Plaza
project is getting close in needing to plan for the reinstallation of the Main Street
Pedestrian Lights.
Other information for the Committee to consider is that the pedestrian lights (the
current downtown standard) have already been ordered for the Aubum Professional
Plaza project. The pedestrian lights have not been ordered yet for the parking
garage and medical office building project; however, those will need to be ordered
very soon. Both projects are vested to the current pedestrian light standard for
Downtown.
Discussion
At the June 9, 2009 Downtown Redevelopment Committee meeting, staff was
directed to work with the project team for Aubum Junction on options for pedestrian
lights. Attached is a packet of options selected by the Aubum Junction team.
Please note that the information was received on July 10, 2009 so staff has had
limited time to review these options for costs.
Staff would also like to note that the pedestrian light option selected, a coordinated
support structure will be selected for the wayfinding signage in downtown.
Page 1 of 2
AUBURN * MORE THAN YOU IMAGINED
At the July 14, 2009 meeting staff would like to review the options with the
Committee and discuss the following questions:
1. Does the Committee want a different standard for Main Street?
Yes or No
2. Does the Committee have a preferred option from the selection provided?
3. Would the Committee consider maintaining the current downtown pedestrian
light standard on streets besides Main Street but paint the light head
black/dark forest green?
Yes or No
Page 2 of 2
AUBURN*MOR£ THAN YOU IMAGINED
4
Auburn Streetlight Options -
Project: Auburn Junction Date: 7.9.09 "
SubJect: Light Fixtures Page: 1 of 1 The Berger Partnership PS
Manufacturer KIfTI SB'lUX SB'lUX Landscape Architecture
Model' Era Beta Lantern Saturn 3
(Option A) (Option B) (Option C)
Fixture $2,100 $2,400-$2,700 $1,900-$2,000
1721 8th Avenue N
Arm (double fixture) $570 (price included with (price included Seattle,WA 98109
fixture) with fixture) v 206325.6877
f 206323.6867
Pole2 (16')
bergerpartnership.com
- Steel (round) N/A $525 $525
- Aluminum (round) N/A $565 $565
- Stepped Steel N/A $1,000 $1,000
- Stepped Aluminum $1,975 N/A N/A
- Non-standard base cover N/A $250 $250
Color' Black Black Black
Banner Arm $300 Possible4 Possible4
$200-$250 $200-$250
Hanging Basket Possibles Possible Possible
(Arm)5 $200-$250 $200-$250
(All prices listed are for double fixtures.)
' Costs are approximate and include standard colors and options.
z Basic base cover included with pole.
3 Custom colors are an additional cost.
Se'lux standard colors: White, black, bronze, silver. Custom color, additional $700 (approx).
Kim standard colors: Black, dark bronze, light gray, silver, white. Kim custom colors include
a charge for each color, minimum order $2,700.
4 Rep for Se'lux (Pacific Lighting Systems) said the Banner Arm and Hanging Basket Arm for
the Beta Lantern and Saturn 3 were not shown as optional accessories through Se'lux, but
he saw no reason why it would not be possible to install them.
5 Possible wind issues in some areas, strength of pole and weight of basket need to be
considered.
6 Depends on many factors.
t
Auburn SLreeclights
f Option A
Kim 'Era'
(Single Fixture)
f
~
a d,..
~
X
I ^f
~
r ~ ~ F.~ • . ~Sd~ r
J'rp "~...V~ ~ . " .+R•: q5"1`.,.,
~r ~ .,'1~ t - e ~ ~j~ • ~
y~j . 1~ ~r~ Y.t , !lT• ~ f~t 't:-. ~
~4-
+~~~'~i~~~
7k`t.t
i
.;iKf~iR ~„s,,~ .1^ w+.'V1t~' ' l. 'r. ~ *`M at
a? `3 )•y Fl . .9 , ~ . ~ -
>
~,¢1 q • ~tir
{i ~ . •r . . ~ y~Y~~ .~a, ~ 'T~+ ~i . .
~We
G
t '~~L ~`,J.. F~~~- tv.~ ~yr l..
~R
;~y~~.~
~ A ' A-r+'~i, `
~ ~ { T'! •
1 ! ,
1
~ I t
I l.~ .ItL.y ~ ' ~:~lJC. ! SYy' °~i' .L L~~"ut,°IYa?V'.
~W
• ~
If
M ~il.~'. ~ . • •~~ai,~~.~;,
_ ' Mu' _ a'(. ~ l 1 ; 1. -.;i 1•_
. _ - - _ _
Auburn atreeClighta
Opt-on A
Klm 'Era'
(DOUble Fixtur5)
,
; , {IIII l: ~
. -
R ~
~ 1 I I
<
9 -
T
_ _ ~ f~• 2
fe Ir N
~
~ ' u' P
` ' { x~,~. ye~ , ~„u',~:
-_f4~~"~a~ t,:
..i ~l
• ~ ~ w;~A` •dYJ : u. `y ~i-..
i"~~...
: :
~ ; ;
Auburn Streetlights
~ Option B
`ze' lux Beta Lantern
+ 5 ^ (Single Fixture)
. . w~
F." ~ . r •
' ' ` . Y ~ ~ . . ~
~ ~i~.
~
.L'~r'
♦ '7R', . ~ ~ 1
.ZN
'i'1♦ ' ~ •i ~~tj ~/::1 ~
~ w. ' ~ l0A
d
^ 'w',.
. i ~ J I~+ s1 r~ ~
~
.
i~
,
.
~
c sir+s~
~
L'1I+
e.~ .f I✓n.r:.
v
i ~
1
l
cn
_ :Y,Fe h
I rI
Scale 1;8 inch - 1 foot Auburn StreeL-lights
Op;,ion B
Sellux Beta Lantern
(Rixr.ure Diagram)
Saturn 3
Auburii SL-reeL-l.ights ~
Option C
Se' 1ux Saturn 3
(Double Pi_xture) . WON
~
~
N-~
_.r .
~ -
1
; -
~ k
Sel"'uX
Ught. ldeas. $ystems. -