HomeMy WebLinkAbout19990712000640 STORM EASEMENT 071299A a. ► 3
Re_rn Address:
City of Auburn
City Clerk
25 West Main
Auburn, WA 98001
Above this line reserved for recording information.
STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
(r'AUUUII-y8 anti DLLU41U niru U41
Reference # (if applicable): N/A
Grantor/Borrower: 1) Brekke Properties
Grantee/Assignee/Beneficiary:
Legal Description/STR:
Assessor's Tax Parcel ID#:
City of Auburn
NW -/u,''1-21-4
158260-0092 & 158260-0091
Additional on page:
2)
Additional on page:
Additional on page: .Jr
THIS EASEMENT AND AGREEMENT made and entered into this day of
19 , by and between the City of Auburn, a municipal corporation of
King County, Washington, hereinafter referred to as "CITY" and Brekke Properties, located at
8592 Hunts Point Lane, Bellevue, WA 98004, hereinafter referred to as "PROPERTY
OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at 3902 West Valley Highway N., Auburn, WA 98001 which create
impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
Storm Water Easement and Maintenance Agreement
Page 1 of $
19990712000640
PAGE 001 OF 008
07/12/1999 10:14
KING COUNTY, WA
CITY OF AUBURN EAS 15.00
A
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMENT
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
property as showing on the approved Record Drawings revised pursuant to construction records
for the City of Auburn under Permit Nos. FA00022-98 and BLD0410 thru 0414-98, which
Record Drawings are hereby incorporated by reference as if set out in full. This easement shall
be a burden to that real estate which is legally described and attached as Exhibit A and
incorporated herein by this reference, and shall be of benefit to the City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he/she/they/it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY.
Storm Water Easement and Maintenance Agreement
Page 2 of
19990712000640
PAGE 2COUNTY1 WA
~III~I~~~II1~
KING
04
CITY OF AUBURN EAS 15.00
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
CITY OF AUBURN
eLmq
DIRECTOR OF PUBLIC WORKS
Owner
Date
J
'
Storm Water Easement and Maintenance Agr.P-----~'
Page 3 of 19990712000640
PAGE 003 OF 008
07/12/1999 10:14
CITY OF AUBURN EAS 15.00 KING COUNTY, WA
STATE OF WASHINGTON)
)ss.
County of King )
I certify that I know or have satisfactory evidence that Toh h !,z'/ • '6 r-e k16 e-
is the person who appeared before me, and said person acknowledged that he/she signed
this instrument, on oath stated that he/she was authorized to execute the instrument and
acknowledged it as the MA no 7 Pr of eve ~x
(::e St VAIl ley , LLC~ , a EerAewation, to be the free and voluntary act of such
party for the uses and purposes mentioned in this instrument.
Dated 31(g-.Lq y
L\N E• e•,,
\C5 /V
0
A
: vo NOTARY ~P -:--1
c,,
-~O PUBLIC
STATE OF WASHINGTON)
)ss.
County of King )
Notary Publi in and for the St e of Washington
residing at If e r 2 Co- - -
My appointment expires li y lD I
I certify that I know or have satisfactory evidence thatb6j-t~~ EMA~
is the person who appeared before me, and said person acknowledged that he signed is
instrument, on oath stated that he was authorized to execute the instrument and acknowledged it
as the DIRECTOR OF PUBLIC WORKS of THE CITY OF AUBURN to be the free and
voluntary~ct ls, lgarty for the uses and purposes mentioned in this instrument.
Dated ( ' I
I.. 0
•0 CM. Z
VBVG Notary Publ' in an d for the to of Was ing on
~.ck P ft residing at
~'.,••BgUAR~: My appointment expires
~~'q~OFVdPS
%ftept o
WW/bd
REF. H:\FAC\FAC2287\E99-320
Storm Water Easement and Maintenance Agreement
Page 4 of
19990712000640
~I III PAGE 004 OF 008 07/12/1999 CITY OF AUBURN EAS 15.00 KING COUNTY, 10WA
f
EXHIBIT "A"
LEGAL DESCRIPTION
LOT "A" &'4B" OF CITY OF AUBURN LOT LINE ADJUSTMENT RECORDED UNDER KING COUNTY
RECORDING NUMBER 9409151193
Storm Water Easement and Maintenance Agreement
Page 5 of 8
19990712000640
PAGE 005 OF 008
07/12/1999 10:14
KING COUNTY, WA
CITY OF AUBURN EAS 15.00
EXHIBIT "B"
FROM POE ENGINEERING, INC. FAX NO. : 206 659 5207 Mar. 16 1999 04:JbFM N2
S-roRMWATF:R POLLUTION PREVENTION PLAN
Jtest Valley Plaza II .
3902 (test Valley Hwy. N.
Auburn, WA
SEPA k 5 EP-0010-98 PAC k PAC xxxx-xx
GRA k GRA XXXX-xx BLD k BLD xxxx-xx
GRA 0025-96 (previous)
Parcel k's Lot •A"-= 158260-0091 Lot "e" • 158260-0092
Introduction:
The West Valley Plaza II Development Buildings will share a common storm
drainage system comprised of underground storm drainage detention vault
and pipe with a water quality biofiltration Swale located on Lot "B".
All buildings will be regarded as one entity with only one Stormwater
Pollution Prevention Plan.
The Lot "A" Buildings are: 9.960 sf and 9,994 sf. The Lot "e"
Buildings are: 8,928 sf, 9,960 sf and 7,643 sf. All buildings will
have an address along West valley Hwy. North. The total site area is
3.05 acres. The total impervious area of the site is assumed to be at
90t or approximately 2.75 acres.
The existing storm drainage system directs surface water runoff via
sheet flow from the undeveloped open fields to the north. No connection
to a tightlined public conveyance system has been observed.
The developed storm drainage runoff is conveyed to the storm water
underground detention system. Stormwater runoff is then routed to the
flow control structure and biofiltration Swale. Stormwater is then
discharged to the public conveyance system located within West Valley
Hwy. N. Right-of-Way.
Plan Goal
The specific purpose for the storm water facility is to minimize
pollution that is typically associated with modern development. In
general, pollution from motor vehicles and pollution generated from
erosion. Attached to this narrative is a maintenance manual which
offers guidelines to the owner for storm water facility maintenance.
Preventative BOP'S
The owner shall be responsible for sweeping the lot, installing storm
drainage stenciling and provide spill control. procedures. In case of
spill call 1-206-649-700.
• BMP RO.05 Spill Control (sc-type) Oil/ Water Separator
* BMP R3.15 Detention Tank (underground concrete vault)
• BMP RB.05 Biofiltration•Swale
These B1,M'S will be inspected a minimum of 2 times per year or as
directed in the Maintenance and Operation Manual. The owner shall keep
a record of inspection and maintenance for a period of 5 years and will
provide a copy of the records and maintenance checklist for the City
Inspector to review.
The City of Auburn Utilities Section is to review and approve any changes to
this stormwater Pollution Prevention Plan prior to changes in its
implementation. Additionally, any changes in ownership or person of
responsibility are to be reported to the City Utilities Sections.
Persona of Responsibility: Brekke Properties
(The vault and bioswale will be 8592 hunts Point Lane
Lot "B" owner's sole responsibility) Bellevue, WA 98004
Ph k (425) 451-1511
(Changes to ownership shall be reported
to the City of Auburn's Utilities Section.)
Storm Water Easement and Maintenance Agreement
Page 6 of 8
19990712000640
PAGE 006 OF 008
07/12/1999 10:14
CITY OF AUBURN EAS 15.00 KING COUNTY, WA
rROM POE ENGINEERING, INC. FAX NO.': 206 659 $207 Mar. 16 1999 04:36PM P3
Inspection: Maintenance:
Regular inspections of.the drainage facilities should be carried out twice per
year, in the spring and fall. The responsible party should keep records of
these inspections available for review by the City. Additional inspections
may be required after severe seasonal storms.
Routine maintenance of the site will include mowing, care of landscaping and
the removal of trash and debris from the drainage system. The parking lots
I and driveways should be kept clean and in. repair. Events such as major storms
or heavy winds will require immediate inspections for damages.
To ensure proper water quality and treatment, the detention vault and the
bioswale must be properly maintained. During summer months the grasses must
be mowed regularly, maintaining a grass length of approximately 3 inches to 6
inches, with prompt removal and proper disposal of grass clippings and trash
or debris. Removal of -any sediment 6 inches deep or covering vegetation is
also necessary within the biofiltration swale. Remove sediments, fertiliz"
and reseed as necessary. Be careful to avoid introducing fertilizer to
receiving waters or-groundwater. If pond side slopes become eroded ever 2
inches deep, stabilize by using appropriate erosion control measures (e.g.,
rock reinforcement, planting of grass, compaction). "
.y
Catch Basins shall-be cleaned when sump is 1/3' full of sediment or debris.
Storm Water Easement and Maintenance Agreement
Page 7 of 8
19990712000640
PAGE 007 OF 008
~~ul~~il~~ IIII !~!d Ili ! II VIII 07/12/1999 10:14
KING COUNTY
CITY OF AUBURN EAS 15.00 , WA
FROM : POE ENGINEERING, INC. FAX NO. : 206 859 5207
Mar. 16 1999 04:37PM P4
INSPECTION / MAINTENANCE CHECKLIST
STRUCTURE
Ma A?eun" Ace
Date
Comments
Inspection
ALL CATCH BASINS
Results
Maintenance
Done
Inspection
DETZZITION VAULT
Results
Maintenance
Done
FLOW CONTROL
Inspection
S:R=TURE
Results
Maintenance
Done
Inspection
8I0574ALE
Results
Maintenance
Deese
Inspection
Results
Maintenance
Done
WWlbd
REF. HAFACTAC2287\ 99-320
Storm Water Easement and Maintenance Agreement
Page 8 of 8
19990712000640
PAGE 008 OF 008
07/12/1999 10:14
KING COUNTY, WA
CITY OF AUBURN EAS 15.00