HomeMy WebLinkAbout20010706001294 STORM EASEMENT 070601J
Return Address:
City of Auburn
City Clerk
25 West Main
A
Auburn, WA 98001 20010706001294
PACIFIC NW TIT EAS 15.00 A/+
07/080/2001 F 14:35 411G KING COUNTY, WA ~+l 3 200,
C/~/ nc`g=1 ~~p
t✓RiV
Oiv. ^1C
Above this line reserved for recording information.
STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
(t'AC;99-UU23, C;RA99-U019, SEP99-UU23)
Reference # (if applicable): N/A Additional on page:
Grantor/Borrower: 1) Dibs Development, LLC 2)
Additional on page:
Grantee/Assignee/Beneficiary: City of Auburn
Legal Description/STR: SW '/a, 11-21-05 Additional on page:
Assessor's Tax Parcel ID#: 630352-0090
0 / 155 -P" W T (IJ- c9 3 Z-7 --12
THIS EASEMENT AND AGREEMENT made and entered into this p2-2 day of
,,W 204 by and between the City of Auburn, a municipal corporation of
tng County, Washington, hereinafter referred to as "CITY" and Dibs Development, LLC,
located at P O Box 987, Auburn, WA 98071, hereinafter referred to as "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at 1400 W. Valley Hwy. N., Auburn, WA 98001, which create
impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage, and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of=way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
Storm Water Easement and Maintenance Agreement
Page 1 of $
EXCISE TAX .NOT REQUIRED
King County R Di ision
BY. , Deputy
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
c make certain that it is functioning properly and for purposes of determining the appropriate
o repairs.
C.Or
o NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
° THE PARTIES AGREE AS FOLLOWS:
r--
(M Section 1, EASEMENT
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
property as showing on the approved Record Drawings revised pursuant to construction records
for the City of Auburn under Permit No(s). FAC99-0023 and GRA99-0019, which Record
Drawings are hereby incorporated by reference as if set out in full. This easement shall be a
burden to that real estate which is legally described and attached as Exhibit A and incorporated
herein by this reference, and shall be of benefit to the City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he/she/they/it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY.
Storm Water Easement and Maintenance Agreement
Page 2 of 8
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
-A.
Cn
crr
V-
C=
G1
aL7
d
O
CV
"A I Lok~
Owner Date
Owner late
SW dooum0*0 ware mod for
Few by Pod Nortttwarxt Tft Ss
6,1~0/!lrMOd~On M hm not been
oxwWr»d a" b PMW exewbon or
as to ft ~ upon tom.
CITY OF AUBURN
DIRECTOR OF PUBLIC WO S
Storm Water Easement and Maintenance Agreement
Page 3 of 8
v
Q7:
cV
IV.
C)
O
tO
0
r-_
0
O
d
C%4
STATE OF WASHINGTON)
)ss.
COUNTY OF KING )
I certify I have know or have satisfactory evidence that 60~1t~•.- ~O~~J
the
person( who appeared before me, and said personk acknowledged thai&she/they signed this
instrument on oath stated that Qhe/they were authorized to execute the instrument and
acknowledge as the
the <01 fiJ -Qz.
a limited liability company, to be the free and
voluntary act of such party for the uses and purposes mentioned in the instrument.
Dated Yo
STATE OF WASHINGTON)
)ss.
County of King )
Notary Public in anfor the State of Washington
residing at
My appointment expir s
of
I certify that I know or have satisfactory evidence that 0'kr~s4-~~ M. Lrnodw
is the person who appeared before me, and said person acknowledged thatshe sign this
instrument, on oath stated thatshe was authorized to execute the instrument and acknowledged it
as the DIRECTOR OF PUBLIC WORKS of THE CITY OF AUBURN to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
Dated Co ~ Zq 0 1
C. WQN
~C.),SS\ON tc~
o N pTARY 9 .
Notary Pu lic in and for the State of Washington
04
' PUBUG ; residing at
11 b, ? % My 'appointment ex ires t I'- 79Q -O 4-
WW/bd
11 -~OFWIN V~ _
REF. H:\FAC\FAC23h4W-n4 and GRA99-0023 (SWEASEMENT&MAINI'AGREE)
Storm Water Easement and Maintenance Agreement
Page 4 of 8
00
EXH 0 3IT 'A'
LEGAL DESCRIPTION
LOT 9. AUBURN PARK OF INDUSTRY, ACCORDING TO PLAT THEREOF
RECORDED IN VOLUME 106 OF PLATS, PAGES 83 THROUGH 85,
IN KING COUNTY, WASHINGTON:. -
TOGETHER WITH THAT PORTION OF LOT 10. AUBURN PARK OF
INDUSTRY ACCORDING TO THE PLAT THEREOF RECORDED IN
VOLUME 106 OF PLATS, PAGES 83 THROUGH 85, IN KING COUNTY,
WSHINGTON DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHEAST CORNER OF LOT 10:
THENCE SOUTH 89'52'16' WEST ALONG THE SOUTH LINE
THEREOF 34.83 FEET: THENCE NORTH 00'07'44` WEST,
rn
232.72 FEET TO A POINT ON A CURVE, ON THE SOUTH EDGE
OF 14TH STREET NORTHWEST; THENCE EASTERLY ON SAID
c5.
CURVE TO THE LEFT. THE CENTER OF WHICH BEARS NORTH
a
05'54'06..' EAST (R) AND LIES 50.00 FEET DISTANT THROUGH
A CENTRAL ANGLE OF AN ARC DISTANCE OF 10.84 FEET
c,
TO THE NORTHEAST CORNER OF SAID LOT 10
C.l
THENCE SOUTH 0530'34' EAST (R) ALONG THE
c=:l
EASTERLY LINE OF SAID LOT 10, 213.11 FEET;
THENCE SOUTH 01"10'00' WEST 15.00 FEET TO THE
_
POINT. OF BEGINNING;
e
(THIS PROPERTY IS LOT A OF BOUNDARY LINE ADJUSTMENT
.
RECORDED IN THE RECORDS OF KING COUNTY, WASHINGTON
UNDER RECORDING. NUMBER -9203110958).
Storm Water Easement and Maintenance Agreement
Page 5 of 8
EXHIBIT `B'
v
Stormwater Pollution Prevention Plan
c3n,
CN: Site Address
o
This project is located in SE % of Section 11, Township 21 N., Range 4 E. W.M. The
site address is 14T" and West Valley Highway N. in Auburn, WA. Tax Parcel No. is
c~ 920311-0958.
o
Introduction
This project involves the construction of a 15,750 sf building, and a new parking lot on
a 1.08 acre site. Stormwater will be treated via a biofiltration swale and detained in
49"x33" detention pipes, before being released into the public storm system. All roof
runoff will be collected into roof drains and conveyed directly to the storm system.
Plan Goal
The goal of the plan is treat the runoff for-water quality before discharging to the public
storm system in 14`' St. NW at the northwest comer of the site.
The property owner is required to enhance and protect water quality due to stormwater
discharges from the site, as dictated by the City of Auburn's Developer Design Manual.
In this document, the site's storm drainage system is generally described and the
inspection and.maintenance requirements are outlined.
Preventative BMP's
Preventative Best Management Practices (BMP's) shall be implemented to ensure that
the water quality measures or provided to site discharge. Such practices include the
following:
1) Areas which discharge runoff to the storm drainage system should be
kept free of debris and any dangerous wastes which may pollute the
storm drainage system. Storm drains shall be stenciled 'DUMP, NO
WASTE, DRAINS TO STREAM." ,
2) The storm drainage utilities should be properly maintained, as described
in the following sections.
Stone Water Easement and Maintenance Agreement
-Wage 6 of 8
INSPECTION\MAINTENANCE CHECKLIST
cs s
C'v
ca
O
cc~p
c>
n.,
0
V.-
C-1.)
0
n,
wl
STRUCTURE DATE OF
INSPECTION MAINTENANCE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONV
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH#
INSP. RESULTS
MAINT. DONE
CB or MH# I
NSP. RESULTS
MAINT. DONE
CS or Mhf# I
NSP. RESULTS
MAINT. DONE
BIOSWALE I
NSP. RESULTS
Tlbd
MAINT. DONE
REF. HAFAC\FAC2394\E00-334 and GR.A99-0023 (SWEASEMENT&MAINTAGREE)
Storm Water Easement and Maintenance Agreement
Page 8 of 8
r
Stormwater Pollution Prevention Plan (Cont.)
Treatment BMP's
The biofiltration swale has been designed to convey and treat runoff for conventional
pollutants.
cv
Inspection
o.
Regular inspection of,the storm drainage facilities will ensure their proper function.
° Inspection shall occur at least twice a year. Records of inspection and maintenance
o shall be kept for five years and shall be available for City inspector to review.
0
0
Maintenance
Regular maintenance of the storm drainage facilities will ensure their proper function.
See King County, Washington, Surface Water Design Manual, Appendix A.
Maintenance Requirements for Privately Maintained Drainage for maintenance
requirements.
Person of Responsibility
DIBS Development, LLC
PO Box 987
Auburn, WA 98071
Contact: Ron Schaafsma
Phone: 253-735-1100
Design Engineer: Rupert Engineering, Inc.
Contact: Larry Krueger
1519 West Valley Hwy. N., Suite 101
Auburn, WA 98001
Plan and/or Information Updates
The City of Auburn Utilities Section is to review and approve any changes to this
Stormwater Pollution Prevention Plan prior to changes in its implementation.
Additionally,. any changes in ownership or person of responsibility are to be reported to
Storm Water Easement and Maintenance Agreement
Page 7 of 8