HomeMy WebLinkAbout20030422001000 STORM EASEMENT 042203 /9 3- /3. ,.2. /3- a/4/
Return Address:
City of Auburn 23030422 301000
City Clerk
25 West Main PACIFIC NU TIT EAS 34.00
PAGE 001 OF 016
Auburn,WA 98001 04/22/2003 10:16
KING COUNTY, WA
Above this line reserved for recording information.
10‘'l STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
W 541 � 1 a, (FACO I-0002)
Reference#(if applicable): N/A Additional on page:
YM T Grantor/Borrower: Auburn Regional Medical Center 2)
Additional on page:
GranteefAssignee/Beneficiary: City of Auburn
Legal Description/STR: NE'A, 13-21 N-4E& Additional on page:
NW 1/4, 18-21 N-5E Said document(s)were filed tot
Assessor's Tax Parcel ID#: 049200-0455,049200-0420, record by Pacific Northwest Title as
049250-0110,049250-0240 2nenmmodation only.It has not been
examined as to proper execution u,
as to its affect upon title.
THIS EASEMENT AND AGREEMENT made and entered into this i#day of
/ Df'?d , 2093 , by and between the City of Auburn, a municipal corporation of
King County, Washington, hereinafter referred to as "CITY" Auburn Regional Medical Center,
hereinafter referred to as "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at Auburn Regional Medical Center located at 202 N Division Street
which create impervious surface (see SEPOO-0021); and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
Storm Water Easement and Maintenance Agreement
Page 1 of 16
•
� 7
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMENT
PROPERTY OWNER hereby provides an easement for stormwater inspection and
maintenance over, under and on that portion of the outdoor, ground level property as shown on
the approved Record Drawings revised pursuant to construction records for the City of Auburn
under Permit No. FAC01-0002 (for the expansion described in SEPOO-0021), which Record
Drawings are hereby incorporated by reference as if set out in full. This easement shall be a
burden to the outdoor, ground level portions of the property containing the stormwater facilities,
for the expansion described in SEPOO-0021 on that real estate which is legally described and
attached as Exhibit "A" and incorporated herein by this reference, and shall be of benefit to the
City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
. Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
outdoor, ground level portions of the property of the PROPERTY OWNER via the easement
described above to inspect and perform necessary maintenance if, after the PROPERTY
OWNER is given written notice to maintain and a reasonable opportunity (thirty days) to
perform such maintenance, the PROPERTY OWNER fails to maintain. Further, the
PROPERTY OWNER agrees the CITY may, after oral notice to Auburn Regional Medical
Center, enter onto the outdoor, ground level portions of the property of PROPERTY OWNER
via the easement described above to perform emergency maintenance in the event of the storm
system's failure which might result in adverse impacts(s) on public facilities or private facilities
of other property owners. In both events the PROPERTY OWNER agrees it shall reimburse the
CITY for the costs incurred by the CITY in maintaining the storm system. Should the CITY
incur attorney's fees and/or costs in enforcing the agreement and/or in maintaining or collecting
Storm Water Easement and Maintenance Agreement
Page 2 of 16
CITY for the costs incurred by the CITY in maintaining the storm system. Should the CITY
incur attorney's fees and/or costs in enforcing the agreement and/or in maintaining or collecting
maintenance fees,the PROPERTY OWNER agrees to pay reasonable attomey's fees and all
costs incurred by the CITY. In carrying out inspections or performing maintenance on the
property of the PROPERTY OWNER, CITY shall not unreasonably interfere with the
PROPERTY OWNER's uses on such property nor damage the property or improvements of the
PROPERTY OWNER.
Section 4,ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in sanctions in addition to the fees for maintenance should violations occur.
EXECUTED as of the date first written above.
CITY OF AUBURN
£) %w —C -Jr-4ts
CITY ENGINEER
5s 4/ 0
Dade
Owner Date
Storm Water Easement and Maintenance Agreement
Page 3 of 16
STATE OF PENNSYLVANIA
)SS.
County of Montgomery )
q
I certify that I know or have satisfactory evidence that a 1,7 a 619 /, '/ref c.trif
Is the person who appeared before me, and said person acknowledged that he signed this
instrument, on oath stated that he was authorized to execute the instrument and
/"\T �f T iT /"ITT\/ ll�A 1 TT 21: to be the free
acknowledged it as the ti. __� ��� , �. . ..
and voluntary act of uch party for the uses and purposes mentioned in this instrument.
Dated: p y/0 7/O J
Notarial Seal public
Marie Haven, Notary County
V I Ge dr? upper Merion Twp.,Montgomery 20_3
My Commission Expires Sept. 1,
5. 17e ' Member,NennsylvaniaAssociationotNotaries
41/ eau, 710..64...(2,,,,,)
/r1ger P.1 ie //a 1,4*4
Notary Public in and for the State of
Pennsylvania residing at I. m'o 4
My appointment expires / a
Storm Water Easement and Maintenance Agreement
Page 4 of 16
109
•
•
•
•
•
•
•
STATE OF WASHINGTON)
)ss.
County of King
I certify that I know or have satisfactory evidence that E nr M ! s '5(I
is the person who appeared before me, and said person acknowledged that he signed this
instrument, on oath stated that he was authorized to execute the instrument and acknowledged it
as the CITY ENGINEER of THE CITY OF AUBURN to be the free and voluntary act of such
party for the uses and purposes mentioned in this instrument.
Dated "I Its/Q3
i�jQ "�55`bN ( 11
i :O`er NCTARl'11)1•, �� -�J ,2�i `�•"/
U —•— cn: ; Notary Public in and for the Stat of WAshington
t • 1'UBUC . residing at t`'«hefi•
V
11lf •'•jr, 9.0` �= My appointment expires
1\‘‘LIFWAS
Storm Water Easement and Maintenance Agreement
Page 5of16
Exhibit 'A'
REVISED (COMBINED)LEGAL DESCRIPTION
THAT PORTION OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 13,
TOWNSHIP 21 NORTH,RANGE 4 EAST,W.M.AND THAT PORTION OF THE SOUTHWEST QUARTER
OF THE NORTHWEST QUARTER OF SECTION 18,TOWNSHIP 21 NORTH,RANGE 5 EAST,W.M.,
KING COUNTY,WASHINGTON,MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE POINT OF INTERSECTION OF THE EAST MARGIN OF NORTH DIVISION STREET
WITH THE NORTH MARGIN OF 1ST STREET NORTHEAST,SAID POINT ALSO KNOWN AS THE SOUTHWEST
CORNER OF THAT PORTION OF SAID NORTH DIVISION STREET VACATED BY THE CITY OF AUBURN MARCH 3,
1891;
THENCE NORTH 0o0000"EAST,ALONG THE WEST MARGIN OF SAID VACATED PORTION OF
NORTH DIVISION STREET,A DISTANCE OF 336.00 FEET TO THE SOUTHWEST CORNER OF
THE NORTH 30 FEET OF THAT PORTION OF VACATED 2ND STREET NORTHEAST AS VACATED
UNDER CITY OF AUBURN ORDINANCE NO.4458,RECORDED UNDER RECORDING NO.9010051318;
THENCE NORTH 0009'20"WEST A DISTANCE OF 24.83 FEET TO THE NORTHWEST CORNER OF PARCEL B
OF LOT LINE ADJUSTMENT NO.LLA 0017-93,RECORDED UNDER RECORDING NO.9406131351;
THENCE ALONG THE NORTH LINE OF SAID PARCEL B,NORTH 89o52'18"EAST,A DISTANCE OF
72.00 FEET TO THE WEST LINE OF PARCEL C OF SAID LOT LINE ADJUSTMENT NO.LLA 0017-93;
THENCE ALONG THE WEST LINE OF SAID PARCEL C,SOUTH 0009'20"EAST A DISTANCE OF 24.83 FEET;
THENCE CONTINUING ALONG THE WEST LINE OF SAID PARCEL C,SOUTH 0o00'00"EAST 24.17 FEET TO
THE SOUTHWEST CORNER OF SAID PARCEL C;THENCE ALONG THE SOUTH LINE OF SAID PARCEL C
NORTH 89°52'18"EAST 183.00 FEET TO THE SOUTHEAST CORNER OF SAID PARCEL C;
THENCE ALONG THE WESTERLY MARGIN OF"A"STREET NORTHEAST,SOUTH 0o00'00"EAST 5.76 FEET
TO THE NORTH LINE OF BLOCK 3 OF SUPPLEMENTAL PLAT OF BALLARD'S PARK ADDITION TO SLAUGHTER,
ACCORDING TO PLAT RECORDED IN VOLUME 8 OF PLATS AT PAGE(S)85,IN KING COUNTY,WASHINGTON.
THENCE ALONG THE NORTH LINE OF SAID BLOCK 3,NORTH 89o51 25"EAST 211.24 FEET TO THE
NORTHEAST CORNER OF SAID BLOCK 3;THENCE ALONG THE EASTERLY LINE OF SAID BLOCK 3,
•
SOUTH 19o26'15"WEST, 197.42 FEET TO THE SOUTHEAST CORNER OF THE NORTH 66.00 FEET OF
LOT 7 OF SAID BLOCK 3;THENCE ALONG THE SOUTH LINE OF THE NORTH 66.00 FEET OF SAID BLOCK 7,
SOUTH 89o5125"WEST 95.54 FEET TO THE EAST LINE OF THE EAST 60.00 FEET OF THE WEST 180 FEET
OF SAID LOT 7;THENCE ALONG SAID EAST LINE,NORTH 0°00'00"EAST,36.00 FEET;
THENCE PARALLEL WITH THE NORTH LINE OF SAID BLOCK 3,SOUTH 8905125"WEST 30.00 FEET;
THENCE PARALLEL WITH THE WEST LINE OF SAID LOT 7,NORTH 00°00'00"EAST 24.00 FEET;
THENCE PARALLEL WITH THE NORTH LINE OF SAID BLOCK 3,SOUTH 8905125"WEST 20.00 FEET;
THENCE PARALLEL WITH THE WEST LINE OF SAID LOT 7,NORTH 0000000"EAST 6.00 FEET;
THENCE PARALLEL WITH THE NORTH LINE OF SAID BLOCK 3,SOUTH 89o5125"WEST 10.00 FEET;
THENCE ALONG THE WEST LINE OF SAID LOT 7,SOUTH 00o0000"EAST 185.84 FEET TO THE NORTH
LINE OF 1ST STREET NORTHEAST;THENCE ALONG THE NORTH MARGIN OF SAID 1ST STREET NORTHEAST,
SOUTH 89o49'10"WEST 245.00 FEET TO THE POINT OF BEGINNING.SITUATE IN THE CITY OF AUBURN,
COUNTY OF KING,STATE OF WASHINGTON.
PARCEL NUMBERS:
049200-0455-05
049200-0420-07
049250-0110-01
049250-0240-04
Storm Water Easement and Maintenance Agreement
Page 6 of 16
Exhibit 'B'
STORMWATER POLLUTION PREVENTION PLAN
For
AUBURN REGIONAL MEDICAL CENTER
SEPA# 00-0021
FAC# 01-0002
Site Address:
The project is located in SE 1/4 NE 1/4, Section 13 —Township 21 N — Range 5
East, W.M. The address is 202 N Division Street, Auburn, Washington. Tax
Parcel # 0492000455.
Introduction:
This storm drainage technical information report has been prepared to address
the City of Auburn's site development and storm drainage requirements for the
Auburn Regional Medical Center Addition located at 202 N Division Street. The
site has an area of approximately 0.80 acres and was previously developed with
building, paving, and landscaping.
The subject site consists of 0.73 acres of roof and paving and 0.07 acres of
landscaping.
According to the City of Auburn's Construction Standards for storm water
management, the city requires storm water quantity and quality control to all
proposed developments. Storm water runoff from the roof is collected and
detained on the roof. Storm water is conveyed by sheet flow to a series of storm
water detention rings in combination with 3" deep detention ponds located on the
building roof. Storm water is released from the roof drain spouts into an 8"
proposed drainage line flowing west and then north into the existing public
system in North Division Street. Storm water flow from the new paving on the
west side of the addition is collected in a StormFilterTM catch basin and then
released as it is treated.
Plan Goal
The specific purpose for the storm water facility is to minimize pollution that is
typically associated with modem development. In general, pollution from motor
vehicles and pollution generated from erosion. Attached to this narrative is a
maintenance manual, which offers guidelines to the owner for storm water facility
Storm Water Easement and Maintenance Agreement
Page 7 of 16
maintenance.
Prevention BMP'S
The catch basins shall have stenciled on them "DUMP NO WASTE — DRAINS
TO STREAM. The owner shall be responsible for sweeping the lot, installing
storm drainage stenciling and provide spill control procedures. In case of spill
call DOE at 1-425-649-7000. The catch basins, roof detention ponds, and
control structures will be visually inspected for accumulation of debris and silt and
will be maintained as required by this pollution prevention plan and attachments.
• Maintenance Standards for Drainage Facilities
No. 1 — Roof Detention Pond
No. 4 — Control Structure/Flow Restrictor
No. 5 — Catch Basins
No. 15 — StormFilterTM
(Department of Ecology Storm Water Manual, August 2001).
Treatment BMP'S
A single cartridge catch basin StormFilterTM has been installed to treat runoff for
conventional pollutants. The StormFilterTM was designed to treat 64% of the 2-
year storm event runoff (water quality storm) from the paving and sidewalks on
the west side of the new building. In addition, the roof detention system is
designed to detain the volume created from releasing half the existing 2-year, 10,
25, and 100-year storm events, while holding the developed 2-year, 10, 25, and
100-year storm volumes.
The City of Auburn Utilities Section is to review and approve any changes to this
stormwater Pollution Prevention Plan prior to changes in its implementation.
Additionally, any changes in ownership or person of responsibility are to be
reported to the City Utilities Sections.
Storm Water Easement and Maintenance Agreement
Page 8 of 16
Inspection / Maintenance:
Regular inspections of the drainage facilities should be carried out twice per year,
in the spring and fall. The responsible party should keep records of these
inspections available for review by the City. Additional inspections may be
required after severe seasonal storms.
Routine maintenance of the site will include mowing, care of landscaping and;the
removal of trash and debris from the drainage system. The parking lots,
driveways, and roof detention system should be kept clean and in repair. Events
such as major storms or heavy winds will require immediate inspections for
damages.
To ensure proper water quality and treatment, the roof detention system and the
single cartridge StormFilter must be properly maintained. Be careful to avoid
introducing landscape fertilizer to receiving waters or groundwater.
Catch basins shall be cleaned when sump is 1/3-foot full of sediment or debris.
Persons of Responsibility:
Universal Health Services Matt Counas, Support Services Director
Mike Mains Auburn Regional Medical Center
367 South Gulph Road 202 North Division Street
King of Prussia, PA 19406 Auburn, WA 98001
253-333-2549 (w)
253-804-1710 (pager)
206-352-7038 (h)
Design Engineer:
Rupert Engineering Inc
JB Rupert
1519 West Valley Highway, Suite 101
Auburn, WA 98001
Plan and/or Information Updates:
The City of Auburn Utilities Section is to review and approve any changes to this
Stormwater Pollution Prevention Plan prior to changes in its implementation.
Additionally, any changes in ownership or person of responsibility are to be
reported to the City Utilities Sections.
Storm Water Easement and Maintenance Agreement
Page 9 of 16
44aINSPECTION/MAINTENANCE CHECKLIST
a..••.:c;sa�• ,, t
.. . `r3o��, =.�.ve•'iklls�..�>.a •.oaa •• � `�' '� 'F�
STRUCTURE DATE:!OFiNSPECTION/MAINTENANCE f r.* *
• r�a �:A. .��,... .. Tt "4.1
+•.9R9td.K>�r +a� ..g. r ,was
Results/
Maintenance Date
Inspection
CB #1 Results
Maintenance
Done
Inspection
CB #2 Results
Maintenance
Done
Inspection
CB #3 Results
Maintenance
Done
Inspection
CB #4 Results
Maintenance
Done
Roof Detention Inspection
Ponds Results
Maintenance
Done
Inspection
P1 Results
Maintenance
Done
Inspection
P2 Results
Maintenance
Done
Inspection
P3 Results
• Maintenance
Done
Inspection
P4 Results
Maintenance
Done
Storm Water Easement and Maintenance Agreement
Page 10 of 16
r>�:..<.,r•&r U t!,ar,An�tir'.1•< r,K+M^M.¢i q S-.Sw�•d-r? r :f 1 c t�h L Vf. .. .. .. ... .
STRUCTURE » ,' 44•DATE OF INSPECT IQN/M 'NAN =E
N"k " 4°P*'4,46* i Fx i .
Inspection
P5 Results
Maintenance
Done
Inspection
P6 Results I,
Maintenance
Done
Inspection
P7 Results
Maintenance
Done
Inspection
P8 Results
Maintenance
Done
Rooftop Restrictor Inspection
Devices Results
Maintenance •
Done
Storm Water Easement and Maintenance Agreement
Page 11 of 16
Maintenance Standards for Drainage Facilities
The facility-specific maintenance standards contained in this
section are intended to be conditions for determining if
maintenance actions are required as identified through inspection.
They are not intended to be measures of the facility's required
condition at all times between inspections. In other words,
exceeding these conditions at any time between inspections and/or
maintenance does not automatically constitute a violation of these
standards. However, based upon inspection observations, the
inspection and maintenance schedules shall be adjusted to
minimize the length of time that a facility is in a condition that
requires a maintenance action.
No. 1 —Roof Detention Ponds
Maintenance ,Defect. Conditions:When`Mainteriance isT x :Results,Expected When;•.
=Component,„ r ,,a Neededz°° ;. _ Maintenance Is Performed
General Trash&Debris Any trash and debris which exceed 5 Trash and debris cleared from site.
cubic feet per 1,000 square feet(this
is about equal to the amount of trash
it would take to fill up one standard
size garbage can). In general,there
should be no visual evidence of
dumping.
If less than threshold all trash and
debris will be removed as part of next
scheduled maintenance.
Contaminants Any evidence of oil,gasoline, No contaminants or pollutants
and Pollution contaminants or other pollutants present.
(Coordinate removal/cleanup with
local water quality response agency).
Insects When insects such as wasps and Insects destroyed or removed from site.
hornets interfere with maintenance Apply insecticides in compliance with
activities. adopted IPM policies
Storage Area Sediment Accumulated sediment that exceeds Sediment cleaned out to designed pond
10%of the designed pond depth shape and depth;pond reseeded if
unless otherwise specified or affects necessary to control erosion.
inletting or outletting condition of the
facility.
Liner(If Liner is visible and has more than Liner repaired or replaced. Liner is fully
Applicable) three 1/4-inch holes in it. covered.
Storm Water Easement and Maintenance Agreement
Page 12 of 16
No. 4—Control Structure/Flow Restrictor
Maintenance Defect» :, „+ ; ;,1 Condition WhenaMatntenance isMeeded' 1.Resulte, Eiipected,�=
Comonentw� ,. �. ,, .. � �r-w
p wuwi�r+� " : ;°" , r� ; 11Yhen Maintenanie
• •� .,.� . .�.,.,� *.,... �*4 1 is Performed
441 ,
. .. . _o .,.... .+r e y t.wrt r rt. r r
.� ++v � '1�4R+R4 t.,fc.,wK.r�1.` dN .q..rky»a.;r:wti i ' )v
General Trash and Debris Material exceeds 25%of sump depth or 1 Control structure
(Includes Sediment) foot below orifice plate. orifice is not blocked.
All trash and debris
removed.
Structural Damage Structure is not securely attached to Structure securely
manhole wall. attached to wall and
outlet pipe.
Structure is not in upright position(allow up Structure in correct
to 10%from plumb). position.
Connections to outlet pipe are not watertight Connections to outlet
and show signs of rust. pipe are water tight;
structure repaired or
replaced and works
as designed.
Any holes--other than designed holes--in the Structure has no
structure. holes other than
designed holes.
Weir Plate Damaged or Missing Control device is not working properly due to Plate is in place and
missing,out of place,or bent orifice plate. works as designed.
Obstructions Any trash,debris,sediment,or vegetation Plate is free of all
blocking the plate. obstructions and
works as designed.
Storm Water Easement and Maintenance Agreement
Page 13 of 16
No. 5—Catch Basins
.t< ;:z
'Maintenance': Defect ;.Conditions.When Maintenance is Needed ; Results Expected When
Component ;,;: , . w -.,. %;'a.�> 'Maintenance is t •
e' • „4> :P 4=. R F,< e..k,w• •, .b m.'f,.s
j performed
General Trash& Trash or debris which is located immediately No Trash or debris located
Debris in front of the catch basin opening or is immediately in front of
blocking inletting capacity of the basin by catch basin or on grate
more than 10%. opening.
Trash or debris(in the basin)that exceeds 60 No trash or debris in the
percent of the sump depth as measured from catch basin.
the bottom of basin to invert of the lowest
pipe into or out of the basin,but in no case
less than a minimum of six inches clearance
from the debris surface to the invert of the
lowest pipe.
Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free
blocking more than 1/3 of its height. of trash or debris.
Dead animals or vegetation that could No dead animals or
generate odors that could cause complaints vegetation present within
or dangerous gases(e.g., methane). the catch basin.
Sediment Sediment(in the basin)that exceeds 60 No sediment in the catch
percent of the sump depth as measured from basin
the bottom of basin to invert of the lowest
pipe into or out of the basin, but in no case
less than a minimum of 6 inches clearance
from the sediment surface to the invert of the
lowest pipe.
Structure Top slab has holes larger than 2 square Top slab is free of holes
Damage to inches or cracks wider than 1/4 inch and cracks.
Frame and/or (Intent is to make sure no material is running
Top Slab into basin).
Frame not sitting flush on top slab, i.e., Frame is sitting flush on
separation of more than 3/4 inch of the frame the riser rings or top slab
from the top slab: Frame not securely and firmly attached.
attached
Fractures or Maintenance person judges that structure is Basin replaced or repaired
Cracks in unsound. to design standards.
Basin Walls/
Bottom
Grout fillet has separated or cracked wider Pipe is regrouted and
than 1/2 inch and longer than 1 foot at the secure at basin wall.
• joint of any inlet/outlet pipe or any evidence of
soil particles entering catch basin through
cracks.
Settlement/ If failure of basin has created a safety, Basin replaced or repaired
Misalignment function,or design problem. to design standards.
Vegetation Vegetation growing across and blocking more No vegetation blocking
than 10%of the basin opening. opening to basin.
Vegetation Vegetation growing in inlet/outlet pipe joints No vegetation or root
that is more than six inches tall and less than growth present.
six inches apart.
Storm Water Easement and Maintenance Agreement
Page 14 of 16
No. 5—Catch Basins
F'/'r9�yfC):,M+kin7� c x�A�kkt�A.a .- ._ �' a .,. .
Maintenance ;Qefect r. *,Conditions'4WhenIMamter ance,is'Needed Results Expected When,'
Component '" I''"' , # r+s+'+- n0 � r
� MwM.-.�,y ��t,�. � .. � �, � � ��, {. °fiAaintenance.is�;.} � �nu.
. ....� a. ,"»f f' ...'1«1 -r ?tr {,t �'"'. ice *4 t.,•.g. k F.. "v� ,.'f Y Operfo ed s �., ,
Contamination See"Detention Ponds" (No. 1). No pollution present.
and Pollution
Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is
Cover Place Any open catch basin requires maintenance. closed
Locking Mechanism cannot be opened by one Mechanism opens with
Mechanism maintenance person with proper tools. Bolts proper tools.
Not Working into frame have less than 1/2 inch of thread.
Cover Difficult One maintenance person cannot remove lid Cover can be removed by
to Remove after applying normal lifting pressure. one maintenance person.
(Intent is keep cover from sealing off access
to maintenance.)
Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design
Unsafe securely attached to basin wall, standards and allows
misalignment, rust,cracks,or sharp edges. maintenance person safe
access.
Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets
(If Applicable) Unsafe design standards.
Trash and Trash and debris that is blocking more than Grate free of trash and
Debris 20%of grate surface inletting capacity. debris.
Damaged or Grate missing or broken member(s)of the Grate is in place and
Missing. grate. meets design standards.
Storm Water Easement and Maintenance Agreement
Page 15 of 16
•
No. 15—StormFilterTM(leaf compost filter) .
Maintenances: ,Defect; Condi'tion`When Maintenance;is G Results Expected When"
`,Component';3a Needed Maintenance is'Performed
Below Ground Sediment Sediment depth exceeds 0.25-inches. No sediment deposits which
Vault Accumulation on would impede permeability of
Media. the compost media.
• Sediment Sediment depth exceeds 6-inches in first No sediment deposits in vault
Accumulation in chamber. bottom of first chamber.
Vault
Trash/Debris Trash and debris accumulated on Trash and debris removed from
Accumulation compost filter bed. the compost filter bed.
Sediment in When drain pipes,clean-outs,become Sediment and debris removed.
Drain full with sediment and/or debris.
Pipes/Clean-
Outs
Damaged Pipes Any part of the pipes that are crushed or Pipe repaired and/or replaced.
damaged due to corrosion and/or
settlement.
Access Cover Cover cannot be opened;one person Cover repaired to proper
Damaged/Not cannot open the cover using normal working specifications or
Working lifting pressure,corrosion/deformation of replaced.
cover.
Vault Structure Cracks wider than 1/2-inch or evidence Vault replaced or repairs made
Includes Cracks of soil particles entering the structure so that vault meets design
in Wall, Bottom, through the cracks,or specifications and is structurally
Damage to maintenance/inspection personnel sound.
Frame and/or determine that the vault is not structurally
Top Slab sound.
Cracks wider than 1/2-inch at the joint of Vault repaired so that no cracks
any inlet/outlet pipe or evidence of soil exist wider than 1/4-inch at the
particles entering through the cracks. joint of the inlet/outlet pipe.
Baffles Baffles corroding,cracking warping, Baffles repaired or replaced to
and/or showing signs of failure as specifications.
determined by maintenance/inspection
person.
Access Ladder Ladder is corroded or deteriorated, not Ladder replaced or repaired and
Damaged functioning properly, not securely meets specifications,and is
attached to structure wall, missing rungs, safe to use as determined by
cracks, and misaligned. inspection personnel.
Below Ground Compost Media Drawdown of water through the media Media cartridges replaced.
Cartridge Type takes longer than 1 hour, and/or overflow
occurs frequently.
Short Circuiting Flows do not properly enter filter Filter cartridges replaced.
cartridges.
Storm Water Easement and Maintenance.Agreement
Page 16 of 16