Loading...
HomeMy WebLinkAbout20070126001298 STORM WATER AND MAINTENANCE AGREEMENT 121506Return Address: City of Auburn City Clerk 25 West Main Auburn, WA 98001 III 11111111111111111111111111111 26070126001298 PACIFIC NU TIT EAS 82.09 PAGE601 OF 019 01/26/2007 11:45 KING COUNTY, LIA Above this line reserved for recording information. STORM WATER EASEMENT AND MAINTENANCE AGREEMENT FAC06-0007 Reference # (if applicable): N/A lThfr 1 1~~ Grantor/Borrower: 1650 WVH LLC t NW 1 Grantee/Assignee/Beneficiary: City of Auburn Legal Description/STR: SW NE % S23-T21N-R4E 9 Assessor's Tax Parcel ID#: 2321049037 THIS EASEMENT AND AGREEMENT made and entered into this 1 S day of J ;F c-F W1 b eQ , 2006, by and between the City of Auburn, a municipal corporation of King County, Washington, hereinafter referred to as "CITY" and 1650 WVH LLC hereinafter referred to as "PROPERTY OWNER". WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the construction of facilities for Del's Farm Supply located at 1650 West Valley Hwy South, which create impervious surface; and WHEREAS, the PROPERTY OWNER will complete a storm system; and WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be maintained to provide adequate facilities for controlling both the quantity and quality of storm drainage; and WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-of-way to bring in equipment to conduct maintenance functions; and WHEREAS, maintenance requirement is a covenant running with the land and binding upon all heirs, successors and assigns of both parties; and Said document(s) were filed for record by Pacific Northwest Title ac aocommodation only. It has eat been examined as to proper exeaitlon or as to its affect upon title. Storm Water Easement and Maintenance Agreement Page 1 of 19 L ,,,SE TAX NOT REQUIRED CiCr ca.ilsswads^'vision WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors and assigns of both parties as to the existence of this easement and agreement; and WHEREAS, an easement is needed to bring in maintenance equipment; and WHEREAS, the parties are both desirous of permitting inspection of the storm system to make certain that it is functioning properly and for purposes of determining the appropriate repairs. NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED THE PARTIES AGREE AS FOLLOWS: Section 1, EASEMENT PROPERTY OWNER hereby provides a non-exclusive easement to the City for access, inspection, and maintenance for the purposes of this Agreement and the attached Storm Water Pollution Prevention Plan, over, under and on that real estate described in Exhibit "A" & "B" and on that portion of the property as showing on the approved Record Drawings revised pursuant to construction records for the City of Auburn under Permit No. FAC06-0007, which record drawings are hereby incorporated by reference as if set out in full. This easement shall be a burden to that real estate which is legally described and attached as Exhibit "A" & "B" and incorporated herein by this reference, and shall be a benefit to the City Storm Drainage Utility System. Section 2, HEIRS, SUCCESSORS AND ASSIGNS This Agreement shall be binding upon the heirs, successors and assigns of the parties. Section 3, MAINTENANCE The PROPERTY OWNER agrees to maintain the storm system in accordance with the ordinances and all applicable codes of the CITY and the Storm Water Pollution Prevention Maintenance and Operation Schedule attached as Exhibit "C" and incorporated herein by this reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the property of the PROPERTY OWNER via the easement described above to inspect and perform necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY may enter onto the property of PROPERTY OWNER via the easement described above to perform emergency maintenance in the event of the storm system's failure which might result in adverse impacts(s) on public facilities or private Storm Water Easement and Maintenance Agreement Page 2 of 19 facilities of other property owners. In both events the PROPERTY OWNER agrees to reimburse the CITY for the costs incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the CITY. Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS PROPERTY OWNER acknowledges that there may be liability for violations of codes that could result in additional fines and/or the possibility of incarceration in addition to the fees for maintenance should violations occur. EXECUTED as of the date first written above. CITY OF AUBURN 7= 64~~' 12-4--010 1w, Storm Drainage Engineer Date STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that Tim Carlaw is the person who appeared before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to execute the instrument and acknowledged it as the STORM DRAINAGE ENGINEER of THE CITY OF AUBURN to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated ta~1s -"may y. 1:•SF~~ ~~d '.,b AZV ip`r~pTARL 9N: ; Nom: PuBuG jot i Notary Public in and for Residing at t / 9 My appointment expires Storm Water Easement and Maintenance Agreement Page 3 of 19 7:;~~ k 'Z- t5 -o(„ Owner Date Owner STATE OF WASHINGTON) ) ss COUNTY OF KING ) Date I certify I have know or have satisfactory evidence that ?V\-p Q'e' - 4 Z Z d reel is/are the person(s) wked of re me, and said person(s) acknowledged that he/she/they signed this instrument on oath stated that he/ h /they was/were authorized to oexecute~ instrument a and acknowledge as the a limited bil' company, to be the free nd voluntary act of such party for the uses and purposes mentioned in the instrument. Dated lS n Dec- MAo- 2446 Ot` n' Notary Public in and Mr the State of Washington Residing at 2 My appointment expfires - -0 d 07 y A t' a KT/tlb File: #1063A REF. H:\Development\Forms\Legal Documents\2006 Storm Water Easement and Maintenance Agreement Page 4 of 19 EXHIBIT "A" LEGAL DESCRIPTION LOT 3, CITY OF AUBURN SHORT PLAT NUMBER SP-5-81 AS RECORDED MAY 12,1981 UNDER RECORDING NUMBER 8105120560, RECORDS OF KING COUNTY, WASHINGTON, (SP) TOGETHER WITH THAT PORTION OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 23, TOWNSHIP 21 NORTH, RANGE 4 EAST OF THE WILLAMETTE MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE EXISTING MONUMENT LOCATED AT THE INTERSECTION OF WEST VALLEY HIGHWAY AND BOUNDARY BOULEVARD; THENCE N 88°44'24" E, ALONG THE MONUMENT LINE OF SAID BOUNDARY BOULEVARD, 60.90 FEET TO THE EASTERLY MARGIN OF SAID WEST VALLEY HIGHWAY AND THE TRUE POINT of BEGINNING: THENCE CONTINUING N 88°44' 24' E, ALONG SAID MONUMENT LINE, 240,43 FEET TO THE WEST MARGIN OF SR 167 AS DELINEATED ON SHEET 3 OF THAT CERTAIN PLAT ENTITLED SR 167, AUBURN 17TH ST. SW TO S. 285TH ST., NOW OF RECORD AND ON FILE IN THE OFFICE OF THE SECRETARY OF TRANSPORTATION AT OLYMPIA, WASHINGTON, BEARING DATE OF APPROVAL OCTOBER 23,1969; THENCE N 2°44'16" E, ALONG SAID WEST MARGIN, 120.18 FEET TO THE SOUTHEAST CORNER OF LOT 3 OF CITY OF AUBURN SHORT PLAT NUMBER SP-5-81 AS RECORDED MAY 12, 1981 UNDER RECORDING AMBER 8105120560, RECORDS OF KING COUNTY, WASHINGTON, THENCE S 78°44' 12` W, ALONG THE SOUTH LINE OF SAID LOT 3, A DISTANCE OF 265.69 FEET TO SAID EASTERLY MARGIN OF SAID WEST VALLEY HIGHWAY; THENCE S 1100812" E, ALONG SAID EASTERLY MARGIN, 74.85 FEET TO THE TRUE POINT OF BEGINNING. SADLERIBARNARD 6 ASSOC, INC. Western Commercial R.E., Roger Hann d 717 W. Stewart 28815 Pacific Hwy. S. Puyallup, Washington 98371 Dwg. W. 2005-066.03 Federal Way, WA, 98003 Storm Water Easement and Maintenance Agreement Page 5 of 19 EXHIBIT "B" EXHIBIT DRAWING 5W. 1/4 of the N.E.1/4 of sec. 23, T. 21 N., R. 4 E., W.M. gAs" OF 3EAMMS faced 8nwac N 8M33.34" E Found PK Nail Mauv W/Rnch 33268' W$ aubs' MEA5. in canc. in Tron 15th St. S.W. piped ilia LOT Z WS&CA WE Sp 7Q~ Ty 7. C000" FADS n tS R0. BCi MQTNIN FENCE x96:6' , e• o. POST -t. A x'11 Farxxt Reber A cap W L©`r3 L5zes TD BE0 4' S Taseo.rr's.,~ e .0 c 6 0.43' E, 6" S.,'a 6 028' f. 093 ` u 2 0 ~•Aa° ^ z 5TA 488.00195' LT lice ~ - +e d=t37 m~ S 7947'W W { } E 60x00 24: 117 3' 4 - 7.25' a2M4'26' E Frondarm ' 1 . 47 36• 4 120.18 Mon. W/RASCh 0 74 32le W M Canc. In Cap 1751" 644-05 Max WhNw-h in Cane 5 W44'2Y W N78'44'12•E N88'44'24'E 4-71-05 62 V-56.93' t4935 s7A 486-84.73, 179 .69'GT. R`75.Do" i7th 5t. 5 6x48 29'39 .1:4735' R-96.00' , (VACATED, REC. 020060824002544) d-75 09'29' EA6MW FOR 1N6RE33. E&KSS Alm PAORTH 2 4a0'n6-)n 0` 100' 200' 300' SCALE P = 100' SA525 OF BEARING RECORD OF SURVEY AS RECORDEb "ER RECOPDD46 NUMBER 8801269002, RECORbS OF KING COUNTY, WASHIWTON,. (ROS) SADLERMARNARD d ASSOC. INC. Western Commercial R.E., Roger Hazzard 717 W. Stewart t>wg, Na. 2005-06&03 28815 Pacific Hay. S. Puya4, Washington 98371 Federal Way, WA, 98003 Storm Water Easement and Maintenance Agreement Page 6 of 19 EXHIBIT "C" STORM WATER POLLUTION PREVENTION MAINTENANCE and OPEATION SCHEDULE For DELS FARM SUPPLY SEPA NO. SEP05-0024 FAC NO. FAC06-0007 GRA NO. GRA05-0023 Site Address: The project is located in SW of NE'/ of Section 23, Township 21 North, Range 4 East, W.M., at 1650 West Valley Highway, in Auburn, Washington. The tax parcel number is 232104-9037. Introduction: This storm drainage technical information report has been prepared to address the City of Auburn's site development and storm drainage requirements for the proposed Del's Farm Supply located at 1650 West Valley Hwy in Auburn Washington. The site has an area of approximately1.4 acres and is currently an open pasture of land. The subject site will be a farm supply storage and retail facility. The subject site consists of two buildings and associated parking areas along with a detention pond and water quality swale. According to the City of Auburn's Construction Standards for storm water management, the city requires storm water quantity and quality control to all proposed developments. We have proposed to collect all of the storm water runoff from the landscaped, building and pavement areas via overland flow and in a series of catch basins. This water will be conveyed by storm drainage pipe to a stormfilter catch basin along with a biofiltration swale and detention pond located at the south and east ends of the site. Here the storm water will be released into an existing ditch, which flows off of the site to the north in the WSDOT right-of-way. Storm Water Easement and Maintenance Agreement Page 7 of 19 Plan Goal: The specific purpose for the storm water facility is to minimize pollution that is typically associated with modern development. In general, pollution from motor vehicles and pollution generated from erosion. Attached to this narrative is a maintenance manual, which offers guidelines to the owner for storm water facility maintenance. Prevention BMP'S: The catch basins shall have stenciled on them "DUMP NO WASTE - DRAINS TO STREAM." The owner shall be responsible for sweeping the lot, installing storm drainage stenciling and provide spill control procedures. In case of spill call DOE at 1-425-649-7000. The catch basins, detention/wetpond, and control structures will be visually inspected for accumulation of debris and silt and will be maintained as required by this pollution prevention plan and attachments. • Maintenance Standards for Drainage Facilities (from the Department of Ecology Ston No No No No No Treatment BMP'S: n Water Manual, August 2001) 1 - Detention Pond 4 - Control Structure/Flow Restrictor 5 - Catch Basins 8 - Typical Biofiltration Swale 15 - Stormfilter A biofiltration swale and stormfilter catch basin have been installed to treat runoff for conventional pollutants. They are designed to treat 64% of the 2- year storm event (water quality storm) for water quality treatment. In addition, the detention pond was designed to detain the volume created from releasing half the existing 2-year, 10, 25, and 100-year storm events, while holding the developed 2-year, 10, 25, and 100-year storm volumes. The City of Auburn Storm Drainage Utility section is to review and approve any changes to this Storm Water Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in ownership or person of responsibility are to be reported to the City of Auburn Storm Drainage Utility section. Storm Water Easement and Maintenance Agreement Page 8 of 19 Inspection/Maintenance: Regular inspections of the drainage facilities should be carried out twice per year, in the spring and fall. The responsible party should keep records of these inspections available for review by the City. Additional inspections may be required after severe storms. Routine maintenance of the site will include mowing, care of landscaping and the removal of trash and debris from the drainage system. The parking lots and driveways should be kept clean and in repair. Events such as major storms or heavy winds will require immediate inspections for damages. To ensure proper water quality and treatment, the stormfilter catch basin, biofiltration swale, and detention pond must be properly maintained. Be careful to avoid introducing landscape fertilizer to receiving waters or groundwater. If wetpond side slopes become eroded over 2" deep, stabilize by using appropriate erosion control measures (e.g., rock reinforcement, planting of grass, compaction). Catch basins shall be cleaned when sump is 1 /3' full of sediment or debris. Person of Responsibility: Mr. Roger Hazzard 1650 WVH, LLC 28815 Pacific Highway South; Suite #10-A Federal Way, WA. 98003 253-941-6600 Design Engineer: Pittman Engineering 12819 SE 38t' Street #159 Bellevue WA. 98006 425-562-7226 Plan and/or Information Updates: The City of Auburn Storm Drainage Utility section is to review and approve any changes to this Storm Water Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in ownership or person of responsibility are to be reported to the City Storm Drainage Utility section. Storm Water Easement and Maintenance Agreement Page 9 of 19 INSPECTION/MAINTENANCE CHECKLIST STRUCTURE VATE OP INSPECTION/MAI NTENANCE Results/ Maintenance Date All Catch Basins Inspection Results Maintenance Done Storm Detention Inspection Pond and Results Biofiltration Swale Maintenance Done Conveyance Pipes Inspection Results Maintenance Done Flow Control Inspection Structure Results Maintenance Done Maintenance Standards for Drainage Facilities: The facility-specific maintenance standards contained in this section are intended to be conditions for determining if maintenance actions are required as identified through inspection. They are not intended to be measures of the facility's required condition at all times between inspections. In other words, exceeding these conditions at any time between inspections and/or maintenance does not automatically constitute a violation of these standards. However, based upon inspection observations, the inspection and maintenance schedules shall be adjusted to minimize the length of time that a facility is in a condition that requires a maintenance action. Storm Water Easement and Maintenance Agreement Page 10 of 19 No. 1 - Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed General Trash & Debris Any trash and debris which exceed 5 Trash and debris cleared from site. cubic feet per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size garbage can). In general, there should be no visual evidence of dumping. If less than threshold all trash and debris will be removed as part of next scheduled maintenance. Poisonous Any poisonous or nuisance No danger of poisonous vegetation Vegetation and vegetation which may constitute a where maintenance personnel or the noxious weeds hazard to maintenance personnel or public might normally be. (Coordinate the public. with local health department.) Any evidence of noxious weeds as Complete eradication of noxious weeds defined by State or local regulations. may not be possible. Compliance with State or local eradication policies (Apply requirements of adopted IPM required. policies for the use of herbicides). Contaminants Any evidence of oil, gasoline, No contaminants or pollutants present. and Pollution contaminants or other pollutants. (Coordinate removal/cleanup with local water quality response agency). Rodent Holes Any evidence of rodent holes if Rodents destroyed and dam or berm facility is acting as a dam or berm, or repaired. (Coordinate with local health any evidence of water piping through department; coordinate with Ecology dam or berm via rodent holes. Dam Safety Office if pond exceeds 10 acre-feet.) Storm Water Easement and Maintenance Agreement Page 11 of 19 No. 1 - Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed Beaver Dams Dam results in change or function of Facility is returned to design function. the facility. (Coordinate trapping of beavers and removal of dams with appropriate permitting agencies.) Insects When insects such as wasps and Insects destroyed or removed from hornets interfere with maintenance site. activities. Apply insecticides in compliance with adopted IPM policies. Tree Growth Tree growth does not allow Trees do not hinder maintenance and Hazard maintenance access or interferes activities. Harvested trees should be Trees with maintenance activity (i.e., slope recycled into mulch or other beneficial mowing, silt removal, vactoring, or uses (e.g., alders for firewood). equipment movements). If trees are not interfering with access or Remove hazard trees. maintenance, do not remove. If dead, diseased, or dying trees are identified. (Use a certified Arborist to determine health of tree or removal requirements.) Side Slopes Erosion Eroded damage over 2 inches deep Slopes should be stabilized using of Pond where cause of damage is still appropriate erosion control measure(s); present or where there is potential for e.g., rock reinforcement, planting of continued erosion. grass, compaction. Any erosion observed on a If erosion is occurring on compacted compacted berm embankment. berms a licensed civil engineer should be consulted to resolve source of erosion. Storage Area Sediment Accumulated sediment that exceeds Sediment cleaned out to designed 10% of the designed pond depth pond shape and depth; pond reseeded unless otherwise specified or affects if necessary to control erosion. inletting or outletting condition of the facility. Liner (If Liner is visible and has more than Liner repaired or replaced. Liner is Applicable) three 1/4-inch holes in it. fully covered. Storm Water Easement and Maintenance Agreement Page 12 of 19 No. 1- Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed Pond Berms Settlements Any part of berm that has settled 4 Dike is built back to the design (Dikes) inches lower than the design elevation. elevation. If settlement is apparent, measure berm to determine amount of settlement. Settling can be an indication of more severe problems with the berm or outlet works. A licensed civil engineer should be consulted to determine the source of the settlement. Piping Discernable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with potential resolved. for erosion to continue. (Recommend a Goethechnical engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Tree Growth Tree growth on emergency spillways Trees should be removed. If root Overflow/ creates blockage problems and may system is small (base less than 4 Spillway and cause failure of the berm due to inches) the root system may be left in Berms over 4 uncontrolled overtopping. place. Otherwise the roots should be feet in height. removed and the berm restored. A Tree growth on berms over 4 feet in licensed civil engineer should be height may lead to piping through the consulted for proper berm/spillway berm which could lead to failure of restoration. the berm. Piping Discernable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with resolved. potential for erosion to continue. (Recommend a Goethechnical engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Emergency Only one layer of rock exists above Rocks and pad depth are restored to Overflow/ Overflow/ native soil in area five square feet or design standards. Spillway Spillway larger, or any exposure of native soil at the top of out flow path of spillway. (Riprap on inside slopes need not be replaced.) Erosion See "Side Slopes of Pond." Storm Water Easement and Maintenance Agreement Page 13 of 19 No. 4-Control Structure/Flow Restrictor Maintenance Defect Condition When Maintenance is Needed Results Expected Component When Maintenance is Performed General Trash and Debris Material exceeds 25% of sump depth or 1 Control structure (Includes Sediment) foot below orifice plate. orifice is not blocked. All trash and debris removed. Structural Damage Structure is not securely attached to Structure securely manhole wall. attached to wall and outlet pipe. Structure is not in upright position (allow up Structure in correct to 10% from plumb). position. Connections to outlet pipe are not watertight Connections to outlet and show signs of rust. pipe are watertight; structure repaired or replaced and works as designed. Any holes, other than designed holes, in the Structure has no structure. holes other than designed holes. Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as designed. One maintenance person cannot move up Gate moves up and and down gate. down easily and is watertight. Chain/rod leading to gate is missing or Chain is in place and damaged. works as designed. Gate is rusted over 50% of its surface area. Gate is repaired or replaced to meet design standards. Orifice Plate Damaged or Missing Control device is not working properly due Plate is in place and to missing, out of place, or bent orifice plate. works as designed. Obstructions Any trash, debris, sediment, or vegetation Plate is free of all blocking the plate. obstructions and works as designed. Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all potential of blocking) the overflow pipe. obstructions and works as designed. Manhole See "Closed See "Closed Detention Systems" (No. 3). See "Closed Detention Systems" Detention Systems' (No. 3). (No. 3). Catch Basin See "Catch Basins" See "Catch Basins" (No. 5). See "Catch Basins" (No. 5). (No. 5). Storm Water Easement and Maintenance Agreement Page 14 of 19 No. 5 - Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed General Trash & Trash or debris which is located immediately No Trash or debris Debris in front of the catch basin opening or is located immediately in blocking inletting capacity of the basin by front of catch basin or on more than 10%. grate opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1 /3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch. and cracks. Frame and/or Top Slab (Intent is to make sure no material is running into basin). Frame not sitting flush on top slab, i.e., Frame is sitting flush on separations of more than 3/4 inch of the the riser rings or top slab frame from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or Cracks in unsound. repaired to design Basin Walls/ standards. Bottom Grout fillet has separated or cracked wider Pipe isregrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or Misalignment function, or design problem. repaired to design standards. Vegetation Vegetation growing across and blocking No vegetation blocking more than 10% of the basin opening. opening to basin. Storm Water Easement and Maintenance Agreement Page 15 of 19 No. 5 - Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed. Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid One maintenance person to Remove after applying normal lifting pressure. can remove cover. (Intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets (If Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate is in place and Miss grate. meets design standards. Storm Water Easement and Maintenance Agreement Page 16 of 19 No. 8 - Typical Biofiltration Swale Maintenance Defect or Condition When Recommended Maintenance to Correct Component Problem Maintenance is Needed Problem General Sediment Sediment depth exceeds 2 Remove sediment deposits on grass Accumulation on inches. treatment area of the bio-swale. When Grass finished, swale should be level from side to side and drain freely toward outlet. There should be no areas of standing water once inflow has ceased. Standing Water When water stands in the Any of the following may apply: remove swale between storms and sediment or trash blockages, improve does not drain freely. grade from head to foot of swale, remove clogged check dams, add underdrains or convert to a wet biofiltration swale. Flow spreader Flow spreaders uneven or Level the spreader and clean so that clogged so that flows are not flows are spread evenly over entire swale uniformly distributed through width. entire swale width. Constant When small quantities of Add a low-flow pea-gravel drain the length Baseflow water continually flow through of the swale or by-pass the base flow the swale, even when it has around the swale. been dry for weeks, and an eroded, muddy channel has formed in the swale bottom. Poor Vegetation When grass is sparse or bare Determine why grass growth is poor and Coverage or eroded patches occur in correct that condition. Re-plant with plugs more than 10% of the swale of grass from the upper slope: plant in the bottom. swale bottom at 8-inch intervals. Or re- seed into loosened, fertile soil. Vegetation When the grass becomes Mow vegetation or remove nuisance excessively tall (greater than vegetation so that flow not impeded. 10-inches); when nuisance Grass should be mowed to a height of 3 weeds and other vegetation to 4 inches. Remove grass clippings. start to take over. Excessive Grass growth is poor If possible, trim back over-hanging limbs Shading because sunlight does not and remove brushy vegetation on reach swale. adjacent slopes. Inlet/Outlet Inlet/outlet areas clogged Remove material so that there is no with sediment and/or debris. clogging or blockage in the inlet and outlet area. Trash and Trash and debris Remove trash and debris from bioswale. Debris accumulated in the bio-swale. Accumulation Storm Water Easement and Maintenance Agreement Page 17 of 19 No.8-Typical Biofiltration Swale Maintenance Component Defect or Problem Condition When Maintenance is Needed Recommended Maintenance to Correct Problem Erosion/Scouring Eroded or scoured swale For ruts or bare areas less than 12 inches bottom due to flow wide, repair the damaged area by filling channelization, or higher with crushed gravel. If bare areas are flows. large, generally greater than 12 inches wide, the swale should be re-graded and re-seeded. For smaller bare areas, overseed when bare spots are evident, or take plugs of grass from the upper slope and plant in the swale bottom at 8-inch intervals. Storm Water Easement and Maintenance Agreement Page 18 of 19 No. 15 - StormfilterTM (leaf compost filter) Maintenance Defect Condition When Maintenance is Results Expected When Component Needed Maintenance is Performed Below Ground Sediment Sediment depth exceeds Y. inch. No sediment deposits that Vault Accumulation on would impede permeability of Media. the compost media. Sediment Sediment depth exceeds 6-inches in first No sediment deposits in vault Accumulation in chamber. bottom of first chamber. Vault Trash/Debris Trash and debris accumulated on Trash and debris removed from Accumulation compost filter bed. the compost filter bed. Sediment in When drain pipes, clean-outs, become Sediment and debris removed. Drain full with sediment and/or debris. Pipes/Clean- Outs Damaged Pipes Any part of the pipes that are crushed or Pipe repaired and/or replaced. damaged due to corrosion and/or settlement. Access Cover Cover cannot be opened; one person Cover repaired to proper Damaged/Not cannot open the cover using normal working specifications or Working lifting pressure, corrosion/deformation of replaced. cover. Vault Structure Cracks wider than 1/2-inch or evidence Vault replaced or repairs made Includes Cracks of soil particles entering the structure so that vault meets design in Wall, Bottom, through the cracks, or specifications and is structurally Damage to maintenance/inspection personnel sound. Frame and/or determine that the vault is not Top Slab structurally sound. Cracks wider than 1/2-inch at the joint of Vault repaired so that no cracks any inlet/outlet pipe or evidence of soil exist wider than 1/4-inch at the particles entering through the cracks. joint of the inlet/outlet pipe. Baffles Baffles corroding, cracking warping, Baffles repaired or replaced to and/or showing signs of failure as specifications. determined by maintenance/inspection person. Access Ladder Ladder is corroded or deteriorated, not Ladder replaced or repaired Damaged functioning properly, not securely and meets specifications, and is attached to structure wall, missing rungs, safe to use as determined by cracks, and misaligned. inspection personnel. Below Ground Compost Media Drawdown of water through the media Media cartridges replaced. Cartridge Type takes longer than 1 hour, and/or overflow occurs frequently. Short Circuiting I Flows do not properly enter filter I Filter cartridges replaced. cartridges. Storm Water Easement and Maintenance Agreement Page 19 of 19