HomeMy WebLinkAbout4614 ~ RESOLUTION NO. 4614 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, APPROVING THE 2011 2016 TRANSPORTATION IMPROVEMENT PROGRAM OF .THE CITY OF AUBURN PURSUANT TO R.C.W. CHAPTER 35:77 OF THE LAWS OF THE STATE OF WASHINGTON _ WHEREAS, RCW 35.77.010 requires that the legislative body of each City . prepare and adopt a comprehensive Transportation Improvement Program (TIP) for the ensuing six years, but only after conducting a public hearing; and : , VI/HEREAS, a public hearing to review the 2011-2016 Transportation Improvement Program for the City of Aubum was held on September 7, 2010 at the hour of 7:30 p.m. in the Council Chambers of the Auburn City Hall, pursuant to notice published in the legal newspaper of the City of Auburn on August 24, 2010; and WHEREAS, saitl amendment to the 2011-20167ransportation Improvement Plan of the City of Auburn was approved by the City Council by motion duly made and carried in said hearing. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON; HEREBY RESOLVES as follows; Section 1. There is attached hereto and denominated as Exhibit "A," the terms of which are incorporated herewith by reference as though fully set forth, a designation of the streets within the corporate limits of the City of Auburn to be improved in the manner therein set forth during the year set for the improvement of such street or streets. Section 2. That the City Engineer of the City of Auburn is hereby directed to forward a certified copy of this Resolution to the Washington State Department of Transportation for filing not more than thirty (30) days after the adoption of this. Resolution. Resolution No. 4614 August 30, 2010 Page 1 i. i. Section 3. That the Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directions of this legislation. Section 4. That this Resolution shall take effeet and be in full force upon r passage and signatures hereon. Dated and Signed this day, of , 2010. ITY O U N ~ _ PE ER B. LEVI/IS MAYOR ATTEST: Danielle E. Daskam, City Clerk APP V AS TO F RM: . niel B. 'd, City Attorney Resolution No. 4614 August 30, 2010 Page 2 ~ * v~ , OAUBURN * U IMAG I Nti'o ~s Transportation Improvement Program 2011-2016 ~ - • - '.r' -:otb~.l-.. ^ I l' • re~~~ ~ ~ . :z~~a~. ~ y~n! ~ ' . - - ' SIOEWp~~~ t-~ _ , _ , ,r~ ~ ~ _ ~ , w- ~ Department of Public Works Transportation Section ~ Approved September 7, 2010 i ('ili' of.ltrhuria lruizspurlcrlrun lnt/)r•rnTM C171 Pru,(11-nrll ~ ~ ~ AUBURN 00T HAN YOU 1AAGIN~Q ~,N Transportation Improvement Program 2011-2016 Appror•cd by Auhurn City ('ouncil Septcmhcr 7, 2010 ('itv uf Auburn 25 West Main Street Auburn, VVA 98001 ( 2 53 )-931-3010 `J ~vww.auhurmva.cyov ('ilv uJ'"luhtu•ri "li•uav)r»'IC!/!(lll Illll)1'Ul'crilcrtl /'rugr•uat 0 ~ ~ ~ * AUBU R-N -V HAN Ya~ ! MAGIN C'over Nhotns: I'oi) IcI'I i; M S lSI:, at 8`1' tit SI : lmprmcnncnts: hottoni nL)ht is Birnnial Sicle\~alk ImPrmenlenl I'rujccl. • ii City ofAuburn Transportation Improvement Program RESOLUTION NO. 4614 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, APPROVING THE 2011-2016 TR.ANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF THE LAWS OF THE STATE OF WASHINGTON WHEREAS, RCW 35.77.010 requires that the legislative body of each City prepare and adopt a. comprehensive Transportation Improvement Program (TIP) for the ensuing six yeazs, but only after conducting a public hearing; and WHEREAS, a public hearing to review the 2011 2016 Transporta.tion Improvement Program for the City of Auburn was held on September 7, 2010 at the hour of 7:30 p.m. in the Council Chambers of the Auburn City Ha11, pursuant to notice published in the legal newspaper of the City of Auburn on August 24, 2010; and WHEREAS, said amendment to the 2011-2016 Transportation Improvement Plan of the City of Auburn was approved by the City Council by motion duly made and carried in said hearing. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: Section 1. There is attached hereto and denominated as Exhibit "A," the terms of which aTe incorporated herewith by reference as though fully set forth, a designation of the streets within the corporate limits of the City of Aubum to be improved in the manner therein set forkh during the year set for the improvement of such street or streets. Section 2. T'hat the City Engineer of the City of Auburn is hereby directed to forward a certified copy of this Resolution to the Washington State Departinent of Transportation for filing not more than thiriy (30) days after the adoption.of this Resolution. - Section 3. That the Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directions of this legislation. . Resolution 4614 iii City ofAuburn,Transportation Improvement Program Section 4. That this Resolution shall take effect and be in full force upon passage and signatures hereon. ' DATED this _ day of September, 2010 CITY OF AUBURN PETER B. LEWIS MAYOR ATTEST: Danielle E. Daskam, City Clerk APPROVED AS TO FORM: Daniel B. Heid, City Attorney , iv Resolution 4614 City of Auburn Transportation Improvement Program Transportation Improvement Program 2011-2016 Table of Contents Ezecutive Surnmary l Introduction l Projects & Financing Plan Summary 3 Financial Constraint & Fund Balance Summary 13 Roadway Improvement Projects ......................................:....................................................................15 ~ A Street NW, Phase 1 15 P 16 Auburn WaY Comdor Im I Street NE Corridor 17 M Street Gra.de Separation .....................:................................................:................................:............18. South 277th Street 19 15th Street SW Reconstruction 20 A Street NW, Phase 2 ...........................................................................................................................21 D StreetNW 22 F Street SE 23 M Street NE 24 BNSF Railyard Grade Crossing 25 West Va11ey Highway Imp 26 8th Street NE Widening 27 49th Street NE 28 Traffic Calming Improvements 29 124th Ave SE Corridor Imp. Phase 3 30 124th Ave SE Corridor Imp. Phase 1 31 124th Ave SE Corridor Imp. Phase 2 32' SE 320th Street Corridorlmp . 33 Downtown Promenade Imp . 34 Intersection Improvement Projects 35 Harvey Rd. & 8th Street NE Imp 35 8th Street NE & R Street NE 36 Auburn Way North & 1 st Street NE 37 Auburn Way South & M Street SE 38 C Street NW & West Main Street 39 F Street SE & 4th Street SE 40 Railroad Crossing Imp . 41 Auburn Way Soutti & Riverwalk Dr SE 42 Traffac Signal & Intelligent Transportation Systems Projects 43 South Auburn ITS Expansion 43 44 Traffic Signal Improvements ITS Dynamic Message Signs 45 East Valley HWY ITS Expansion 46 v City of Auburn Transportation Improvement Program Transportation Improvement Program 2011-2016 ~ Table of Contemts (cont.) Non-Motorized & Transit Improvement Projects ................................................................................47 Auburn Way South Corridor Imp. Ph.l 47 Skinner Road/ 3rd Avenue Trail 48 BNSF/ East Va11ey HWY Ped. Underpass 49 Academy Drive Class 1 Trai1 ,50 Metro Shuttles 51 Citywide Pedestrian Crossing Program . 52 Citywide Arterial Bicycle and Safety Imp 53 Citywide Sidewalk Improvements 54 A St NE Ped. Imp . 55 Interurban Trailhead Imp..:..:............................:. 56 37th Street SE & R St SE Ped Connector 57 Lea Hill Pedestrian Improvements 58 Preliminary Engineering & Miscellaneous Projects 59 41 st Street SE & A St SE Access Study 59 . S 277t' St Wetland Mitigation 60 104tli Ave SE & Green River Rd Study 61 Environmental Park Study 62 Downtown to Les Gove Non-Motorized Study 63 _ S 316th Bike and Ped Study 64 Kersey Way SE Study 65 Mary Olson Farm Imp . 66 ltoadway Preservation Projects 67 ~ Annual Bridge Preservation Project 67 Annual Arterial Street Preservation 68 Anriual Arterial Crack Sea1 Program 69 Loca1 Street Imp. Program (SOS) 70 Project Summary Spreadsheet . . . . . . . . . . , . ..Appendix A 2011-2016 TIP Project Map ..........................................................................:..Appendix Bvi City of Auburn Transportation Improvement Program EXECUTIVE SUIVIMARY The Transportation Improvement Program (TIP) is a 6-year plan (2011-2016) for transportation. improvements that supports the City of Auburns current and future growth. The TIP along with 'the Comprehensive Transportation plan serve as source documents for the City of Auburn Capital Facilities Plan which is a Comprehensive Plan element required by Washington's Growth Management Act. The program may be revised at any time by a majority of the City Council after a public hearing. The 2011- -2016 TIP recognizes approximately $111 million worth of transportation improvements (including Non- Motorized and roadway preservarion) over the next six years. INTltO1)UC'I'ION - Purpose - _ _The purpose, of the TIP is to identify, priority transportation projects and assure that the city has advanced plans as a guide in carrying out a coordinated transportarion program. There are always more projects than available_ revenues., Therefore, a primary objective of the TIP is to integrate the two to produce a comprehensive, realistic program for the orderly development and maintenance of our street system. Projects are required tobe included in the TIP in order to be eligible for state and federal grants. Grant funding for projects listed may not yet be secured. Statutory Requirements Six Year Transportation Improvement Program - RCW 35.77.010 requires that each cifiy prepare and adopt a comprehensive transportation improvement program for the ensuing six calendar years consistent with its Comprehensive Transportation Plan. Tliis six-year Transportation Improvement Program (TIP) shall be filed with the Secretary of the Washington State Department of Transportation (WSDOT) each year within 30 days of adoption. Projects of Regional Significance - RCW 35.77.010 also requires each city to specifically set forth those projects and programs of regional significance for inclusion in the transportation improvement program for that region. The 2011-20167IP includes 6 projects of regional significance: TI~P Pro'ect Nuinber'?. ~ Pro ect Trtle; { TIP #5 ` iVI Street Grade Se aration TIP # 6 S' 277 St Widenin TIP #13 South Auburn ITS Ex ansion TIP #14 West Valle Hi wa Im rovements TIP #50 ITS D mic Messa e Si s TIP #51 East Valle Hi hwa ITS Ex ansion ~ Executive Summary & Introduction 1 City of Auburn Transportation Improvement Program Methodology Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable estimate of funding available to accomplish the transportation improvement needs. Since the desire to construct transportation improvements typically exceeds the available forecast revenue, it is necessary to establish some method of prioritizing the needs. , Transportation needs are identified by, examining the latest information concerning level of service, safety and accident history, growth trends, traffic studies and the City's adopted Comprehensive Transportarion Plan. The _likelihood of receiving federal or state grants for various improvements, community interests and values are also considered. All of these factors yield a prioritized list of transportation improvements. Projects are placed into one of the following categories; Roadway Improvements, Intersection Improvements, Signal & Intelligent Transportation System Improvements, Non-Motorized & Transit Improvements, Preliminary Engineering & Miscellaneous projects and Roadway Preservation Projects, Each project is identif ed as a Capacity or Non-capacity improvement and those that lay within the limits of a defined Arterial LOS Corridor per with Table 2-2 of the City's Comprehensive Transportarion Plan are identified accordingly. ' Detailed project costs and funding sources are identified and provided for each project listed in the proposed TIF. The prioritized list is then fma.ncially constrained in the first three years to reflect the financial projections to yield the six-year Transportation Improyement Program. After completing all reviews and compiling the document staff makes final. recommendations to the Planning and Community Development Committee and City Council for approval. 2 Executive Summary & Introduction City of Auburn Transportation Improvement Program Proj ects & Financing Plan Summary 2011 2012 2013 2014 2015 2016 Total TIP# Roadwav Improvement Projects 1 'A Street NW, Phase 1($4.1 Million 6cpended Prwr to 2011) Capital Costs 7,368,500 - 7,368,500 Fundirtg Sources: Unrestricted Street Revenue - - - - - - - Grants 6,652,000 - - - - - 6,652,000 Traffic Im pact Fees 216,500 - - - - - 216,500 Other(Devefo,pmenfl 500,000 - - - - - 500,000 3 Auburn Way Corridor Imp. ($78,000 Expended Prior to 2011) Capital Costs - - 818,700 3,000,000 - - 3,818,700 Funding Sources: Unrestricted Street Revenue - - 110,000 600,000 - - 710,000 Grants - - 708,700 2,400,000 - - 3,708,700 Other - - - - - - - 0 4'C Street NE Corridor ($12,000 Ezpended .Prior to 2011) Capital Costs - - 460,000 1,020,000 4,280,000 - 5,760;000 , Fundirtg Sources: UnresfricEed Street Revenue - - - - - - - - - - Grants Traffic Im pact Fees - - - - - - - .Other(OtherAgencies) _ - • ' - ' 150,000 ' . . 150,000- Other(Development) 460,000 1,020,000 4,130,000 5,610,000 5'M' Street (Yade Separation ($5.5 Million Expended Prior to 2011) Capital Costs 2,115,000 12,985,000 1,800,000 - - - 16,900,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 615,000 5,385,000 - - - - 6,000,000 REET2 - - - - - - TrafficlmpactFees 1,500,000 661,400 - - - - 2,167,400 Traffic N6tigation Fees - - - - - - - Other (OtherAgencies) - 6,938,600 1,800,000 - - - 8,738,600 6 South 277th - Aubum Way North bo GYeen tSver Bridge {$19,000 6cpended Prior to 2011) _ - -os- - - - - Capital Cts - 276;500 803,500 3,000,000 - - 4,080,000 Funding 5ources: Unrestricted StreetRevenue - - - - - - - Grants - - - - 1,500,000 - - 1,500,000 Other(Development) - - - 1,500,000 - - 1,500,000 Ofher(OtherAgenaes) - 276,500 803,500 - - - 1,080,000 7 15th St SW Reconstruction • Capital Costs - - 375,000 3,000,000 - - 3,375,000 Funding Sources: . Unrestricted Street Revenue - - 75,000 500,000 - - 575,000 Grants - - 300,000 2,500,000 - - 2,800,000 Other - - - - - - - 8'A' Street NW, Phase 2($175,000 Expended Prior to 2011) Capital Costs 75,000 162,000 2,288,000 - - - 2,525.000 Funding Sources: ' Unrestricted Street Revenue - - - - - - - Grants - - 2,119,300 - - 2,119,300 Traffic Impact Fees 75,000 162,000 168,700 - - - 405,700 Other - - - - - - - Projects & Financing Plan Summary 3 City of Auburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Roadwav Imurovement Proiects (Cont.) 9'D' Street NW, 37th to 44th ($6 Million beyond 2016) Capital Costs - - - - 200,000 200,000 400,000 Funding Sources: Unrestricted Street Revenue - - - - - - _ Grants - - - - 160,000 160,000 320,000 Traffic Im act Fees - - - - 40,000 40,000 80,000 10 'F Street SE, 4th to AWS ($8,000 Expended Prior to 2011) Capital Costs - - - 200,000 1,000,000 - 1,200,000 Funding Sources: Unrestricted Street Revenue - - - - - - . Grants - - - - 780,000 - 780,000 Traffic Im act Fees - - - 200,000 220,000 - 420,000 11 'M' Street NE, E. Main to 4th Capital Costs 50,000 - - 275,000 1,000,000 - 7,325,000 Funding Sources: Unrestricted Street Revenue - - - - - - . Grants - - - 225,000 897,500 - 1,122,500 Traffic Im act Fees 50,000 - - 50,000 • 102,500 - 202,500 12 Grade-Separated Crossing of BNSF Ratlyard ($31 INitlion beyond 20t6) Capital Cosis - - - - - 1,000,000 1,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - . Grants - - - - - - - Other Davelo ment - - - - - 1,000,000 1,000,000 14 West Valley Hwy Improvements ($465,000 Expended Prior to 2011) Capital Costs 4,535,000 - - - - - 4,535,000 Funding Sources: Unrestricted Street Revenue 55,000 - - - - - 55,000 Grants 2,730,000 - - - - - 2,730,000 REET2 - Traffic Mitigation Fees - Traffic Impact Fees 530,000 - - - - - 530,000 Other (Storm Fund 432) 1,220,000 - - - - - 1,220,000 15 Sth Street NE Wiclening (Pike Street to R Street NE) Capital Costs - - 450,000 1,000,000 - - 1,450,000 Funding Sources: Unrestricted SUeet Revenue - - 90,Q00 200,000 - - 290,000 Grants - - 360,000 800,000 - - 1,160,000 Traffic Im ct Fees - - - _ 16 49th Street NE from Aubum Way North to M Street NE Capital Costs 850,000 2,500,000 - - - - 3,350,000 Funding Sources: Unrestricted Street Revenue - - - - - - _ Grants Traffic Impact Fees - - Other Develo ment 850,000 2,500,000 - - - - 3,350,000 33 Traffic Calming Improvements Capitai Casts 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Funding Sources: Unrestricted Cap. Imp. Funds - - - - - - _ Grants - - - - - - - REET2 - - - - - - Other Redflex in Fund 328 200,000 200,000 200,000 200,000 200,000 200,000 112D0,000 4 Projects & Financing Plan Summary City of Auburn Transportation Improvement Progf-am 2011 2012 2013 2014 2015 2016 Total TIP Roadwav improvement Proiects (Cont.) 39 124th Ave 3E Corridor Improvements Phase 3 Capitai Costs - - - - 100,000 750,000 850,000 Funding Sources: Unrestricted 5'treet Revenue - - - - - - - Grants - - - - 85,000 650,000 735,000 Traffic Im act Fees - - - - 15,000 100,000 115,000 40 124th Ave SE Corridor Improvements Phase 1 Capital Costs - 50,000 150,000 1,750,000 - - 1,950,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 125,000 1,565,000 - - 1,690,000 Traffic Im ct Fees - 50,000 25,000 185,000 - - 260,000 41 124th Ave SE Corridor Improvements Phase 2 Cap"rtai Costs - - 30,000 150,000 1,000,000 - 1,180,000 Funckng Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 100,000 865,000 - 965;000 Traffic Im act Fees - - 30,000 50,000 135,000 215,000 42 SE 320th St Corridor Improvements Capital Costs - - - 30,000 60,000 580,000 670,000 Funding Sources:_ _ Unrestricted Street Revenue - - - - - - - Grants - - - - 51,500 502,100 553,600 Traffic Im act Fees - - - 30,000 8,500 77,900 116,400 52 Downtawn Promenade Improvements ($1.2 61lithon Expended Prior to 2019) - Capitat Costs 6,800,000 - - - - - 6,800,000 Funding Sources Unrestricted Street Revenue - - - - - - - GTartts 2,544,000 - - - - - 2,544,000 Other GO Bortds 4,256,000 - - - - - 4,256,000 Subtotal. Roadwav Imorovement Proiects: Capital Costs 21,993,500 16,173,500 7,375,200 13,625,000 7,840,000 2,730,000 69,737,200 Funding Sources Unresficted Street Revenue 55,000 - 275,000 1,300,000 - - 1,630,000 Grants 12,541,000 5,385,000 3,613,000 9,090,000 2,839,000 1,312,100 34,780,100 Traffic Impact Fees 2,371,500 873,400 223,700 515,000 521,000 217,900 4,722,500 Other (Other Agencies) - 7,215,100 2,603,500 - 150,000 - 9,818,600 Other (Storm Fund 432) 1,220,000 - - - - - 1,220,000 Other (Redflex in Fund 328) 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Other(Development) 1,350,000 2,500,000 460,000 2,520,000 4,130,000 1,000,000 11,960,000 Other (GO Bonds) 4,256,000 - - - - - 4,256,000 Total Funding 21,993,500 16,173,500 7,375,200 13,625,000 7,840,000 2,730,000 69,737,200 ~ Projects & Financing Plan Summary 5 City of Auburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Intersection Imorovement Profects 17 Ftarvey Rd. & 8th St NE Intersection tmprovements ($2.1 Million Expended PMor to 2011, $996K beyond 2016) Capital Costs 87,700 87,300 87,000 86,500 86,000 86,000 520,500 Funding Sources: . UnresVicted Street Revenue - - - - - 86,000 86,000 Grants - - - - - - - PWTF - - - - - - - Traffic Im act Fees 87,700 87,300 87,000 86,500 86,000 - 434,500 18 8th Street NE and R Street NE Traffic Stgnal ($647,000 Expended Prior to 2071) Capital Costs 1,000 - - - - - 7,000 Funding Sources: UnresUicted Street Revenue 1,000 - - - - - 1,000 Grants - - - - - - - Other - - - - - - _ 19 Au6um Way North / 1st Street NE Signal Improvements Capital Costs - 20,000 580,000 - - - 600,000 Funding Sources: . Unrestricted Street Revenue - 20,000 130,000 - - - 150,400 Grards - - 450,000 - - - 450,000 Other - - - - - - 20 Aubum Way South and M Street St Intersection Improvements ($25,000 Expended Prior to 2011) Capital Costs 75,000 - 900,000 - - - 975,000 Funding Sources: , Unrestricted Street Revenue 75,000 - - - - - 75,000 Grants - - 765,000 - - - 765,000 Traffic Miti ation Fees - - 135,000 - - - 135,000 21 C Street NW and West Main Street Capital Costs - - 100,000 1,000,000 - - 1,100,000 Funding Sources: Unrestricted SVeet Revenue - - 20,000 200,000 - - 220,000 Grants - - 80,000 800,000 - - 880.000 Other - - - - 25 F St SE and 4th St SE Traffic Signal ($396,000 Expended Prior to 2011) Capital Costs 1,000 - - - - - 1,000 Funding Sources: Unrestricted Street Revenue 1,000 - - - - - 1,000 Grants - Other - - - - - - . 38 Raiiroad Crossing Safety Improvements Capital Costs - - 150,000 850,000 - - 9,000,000 Funding Sources: Unrestricted Street Revenue - - 25,000 110,000 - - 135,000 GraMs - - 125,000 740,000 - - 865,000 Other - - - _ 43 Aubum Way South & Riverwalk Intersection Improvements Capital Costs - - - - 150,000 2,250,000 2,400,000 Funding Sources: Unrestricted Street Revenue - - - - - - . Grants - - - - 125,000 1,951,000 2,076,000 Traffic Impact Fees - - - - 25,000 299,000 324,000 Subtotal. Intersection Imo. Prolects: Capital Costs 164,700 107,300 1,817,000 1,936,500 236,000 2,336,000 6,597,500 Funding Sources Unrestricted Street Revenue 77,000 20,000 175,000 310,000 - 86,000 668,000 Grants - - 1,420,000 1,540,000 125,000 1,951,000 5,036,000 Traffic Impact Fees 87,700 87,300 87,000 86,500 111,000 299,000 758,500 Traffic Mitiga6on Fees - - 135,000 - - - 135,000 Total Funding 164,700 107,300 1,817,000 1,936,500 236,000 2,336,000 6,597,500 6 Projects & Financing Plan Summary City ofAuburn Transportation Improvement Program 2011 2012 2013 2014 2015 2076 Total TIP# Trafflc Siqnal and Intetliaent Transaortation Svstem (ITS) Proiects 13 South Aubum fT3 Expansion ($803,000 6cpended Prior to 2011) ~ Capital Costs 1,000 - - - - - 1,000 ~ Funding Sources: Unrestricted 5treet Revenue 1,000 - - - - - 1,000 Grants - - - - - - - Trdffic Mitigation Fees - - - - - - - L Other - - - - - - - ! 34 Traffic Signal Improvements Capital Costs 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 Funding Sources: Unrestricted Cap. Imp. Funds - - - - - - - Grants • - - - - - - - Other REET 2 in Fund 328 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 50 ITS Dynamic Message Signs ($880K beyond 2016) Capital Costs - - - 220,000 - 220,000 440,000 Funding Suurces: Unrestricted Street Revenue - - - 30,000 - 30,000 60,000 Grants - - - 190,000 - 190,000 380,000 Traffic Mi ' ation Fees - - - - - - - 51 East Valley Highway ITS Expansion Capital Costs - - - 800,000 - - 800,000 Funding Sources: Unrestricted SVeet Revenue - - - - - - - Grants - - - 692,000 - - 692,000 Traffic Impact Fees - - - 108,000 - - 108,000 Subtotal. Trafric Sianal 8 fTS Proiects: Capital Costs 176,000 175,000 175,000 1,195,000 175,000 395,000 2,291,000 Funding Sources Unrestricted Street Revenue 1,000 - - 30,000 - 30,000 61,000 Grants - - - 882,000 - 190,000 1,072,000 Traffic Impact Fees - - - 108,000 - - 108,000 Other (REET2 in Fund 328) 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 Total Funding 176,000 175,000 175,000 7,195,000 175,000 395,000 2,291,000 Projects & Financing Plan Summary 7 City ofAuburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Non-Motorized 8 Transit Imorovement Pro(ects 2 Auburn Way South Corridor Improvements Phase 1 Capital Costs 160,000 680,800 - - - - 840,800 ~ Funding Sources: Unrestricted SVeet Revenue 40,000 60,000 - - ' - - 100,000 Grants 720,000 620,800 - - - - 740,800 L Other - - - - - - - I 22 Skinner Road to 3rd Avenue (Aubum Paciflc Trail Phase2) ($762,000 Expended Prior to 2011) Capital Costs 1,000 - - - - - 1,000 Funding Sources: Unrestricted Street Revenue 1,000 - - - - - 1,000 Grants - Other (OtherAgencies) - - - - - _ . 23 BNSF/E. Valley Highway PedestNan Underpass ($224,000 Expended Prllarr to 2011, $5 Million beyond 2015) Capital Costs - - - - - 4,800,000 4,840,000 Funding Sources: Unrestricted Street Revenue - - - - - - . Grants - - - - - 4,550,000 4,550,000 Other OfherAgencies - - - - - 250,000 250,000 24 Academy Drive Multi-Use Trail Capital Costs - - 10,000 150,000 425,000 425,000 1,010,000 Funding Sources: Unrestricted Street Revenue - - 10,000 150,000 42,500 42,500 245,000 Grants - - - - 382,500 382,500 765,000 Other - - - - _ _ _ 26 METRO Shuttle: Aubum Community and Lakeland Shuttles - Capital Costs 220,000 220,000 220,000 220,000 220,000 220,000 1,320,000 Funding Sources: Unrestricted Stteet Revenue 220,000 220,000 220,000 220,000 220,000 220,000 1,320,000 Grants - - - - - - - Traffic Im act Fees - - - - _ _ _ 30 Citywide Pedestrian Crossing Program Capital Costs - 100,000 - 100,000 - 100,000 300,000 Funding Sources: Unrestricted Street Revenue - 100,000 - 100,000 - 100,000 300,000 Grarrts - - - - _ _ Other - - - - - - - 31 Citywide Arterial Bicycle and Safety improv. Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Unrestricted Street Revenue 100,000 10000 100,000 100,000 100,000 100.000 600,000 Grants - - - - - - - Other - - - - - - - 32 Citywide Sidewalk Improvements Capital Costs 180,000 20,000 180,000 20,000 180,000 20,000 600,000 Funding Sources Unrestricted Cap. Imp. Funds 180,000 20,000 180,000 20,000 180,000 20,000 600,000 Grants - - - - - - - Other (REET2 in Fund 328) 8 Projects & Financing Plan Summary City of Auburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Non-Motorized & Transit Imorovement Proiects (Cont.) 44 A ST NE Pedestrian Improvements I 'i Capital Costs - - 150,000 - - - 150,000 ! Funding Sources: ~i Unrestricted Street Revenue - - - - - - - j Grants - - 150,000 - - - 150,000 ~ Traffic Im ct Fees - - - - - - - 45 Interurban Trailhead Improvements Capital Costs - - - 210,000 - - 210,000 Funding Sources: Unrestricted SUeet Revenue - - - - - - - Grants - - - 185,000 - - 185,000 Traffic Mitigation Fees - - - 25,000 - - 25,000 I 53 37th St Se & R St SE PedestNan Connedor ($124,000 Expended Prior to 2011) i Capftal Costs 1,000 - - - - - 1,000 ~ ~ Funding Sources: Unrestric4ed Street Revenue 1,000 - - - - - 1,000 Grants - - - - - - - Traffic im act Fees - - - - - - - 56 Lea Hiil Pedestrian Improvements Capital Costs 57,080 296,820 - - - - 353,900 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 57,080 296,820 - - - - 353,900 Traffic Impact Fees - - - - - - - Subtotal. Non-Motorized & Transit Proiects: Capital Costs 779,080 1,417,620 660,000 800,000 925,000 5,665,000 10,186,700 Funding Sources Unrestricted Street Revenue 362,000 480,000 330,000 570,000 362,500 462,500 2,567,000 Grants 177,080 917,620 150,000 185,000 382,500 4,932,500 6,744,700 Traffic Mitigation Fees - - - 25,000 - - 25,000 Unrestricted Cap. Imp. Funds 180,000 20,000 180,000 20,000 180,000 20,000 600,000 Other (Other Agencies) - - - - - 250,000 250,000 Total Funding 719,080 1,477,620 660,000 800,000 925,000 5,665,000 10,186,700 Projects & Financing Plan Summary 9 City, of Auburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Preliminarv Ennineerina and Miscellaneous Proleets 27 41st Street 5E and A 3treet SE Access Management Study Capital Costs 10,000 - - - - - 10,000 Funding Sources: UnresUicted Street Revenue 10,000 - - - - - 10,000 Grants - - - - - - - Traffic 1m act Fees - - - 29 So. 277th, Wetland MiUgation ($204,000 Expended Priorto 2011) Capital Costs 25,000 25,000 25,000 - - - 75,000 Funding Sources: Unrestricted Street Revenue 25,000 25,000 25,000 - - - 75,000 Grants - - - - - - - Other - - - - - - - 46 104th Ave SE 8 Green River Road Study ($2,000 Expended Prior to 2041) Capital Costs 3,000 - - - - - 3,000 Funding Sources: Unrestricked Street Revemie 3,000 - - - - - 3.000 Grants - - - - - - - Traffic Im ct Fees - - - - - - 47 Environmental Park Roadway Improvements Study Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - Traffic Im ct Fees - - - - - - - 48 Downtown to Les Gove Non-Motorized trnprovementr. Siudy ($2,000 Expended Pr7cr to 2011) Capital Costs 8,000 - - - - - 8,000 Funding Sources: Unrestricted Street Revenue 8,000 - - - - - 8,000 Grartts - - - - - • - - Traffrc Im act Fees - - - - - - 49 S 316th St Bfcycle & Pedestrian Improvement Study ($1,000 Expended Prlor to 2011) • Capital Costs 4,000 - - - - - 4,000 Funding Sources: Unrestricted Street Revenue • 4,000 - - - - - 4,000 Grants - - - - - - - Traffic Im act Fees - 54 Kersey Way Study Capital Costs 100,000 - - - - - 100,000 Fundirtg Sources: Unrestricted Street Revewe - - - - - - _ Grants - - - - - - - Traffic Im ad Fees 100,000 - - - - 100,000 55 Mary Olson Farm Improvements ($137,000 Expended Prior to 2011) Capital Costs 1,000 - - - - - 1,000 Funding Sources: Unrestricted Street Revenue - Grants - - - - - - - Other (341 Park Funds) 1,000 - - - - - 1,000 Subtotal. Prel. Ena. and Misc. Proiects: Capital Costs 156,000 25,000 25,000 - - - 206,000 Funding Sources UnresVicted Street Revenue 55,000 25,000 25,000 - - - 105,000 Traffic Impad Fees 100,000 - - - - - 100,000 Other(341 ParkFunds) 1,000 - - - - - 1,000 Total Funding 156,000 25,000 25,000 - - - 206,000 10 Projects & Financing Plan Summary City of Auburn Transportation Improvement Program 2011 2012 2013 2014 2015 2016 Total TIP# Roadwav Preservation Proiects - - - i 28 Mnuat Bridge Preservation Project ~ , Capital Costs 50,000 50,000 50,000 50,000 50,000 50,000 300,000 I ' Funding Sources: I Unrestricted Street Revenue 50,000 50,000 50,000 50,000 5U,000 50,000 300,000 ~ ! Grants - - - - - - - ~ ~ Traffic Impact Fees - - - - - - - i 35 Annual Arterial Street Preservation Capital Costs 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 Funding Sources: Unrestricted StreetRevenue - - - - - - - Grants - - - - - - - Arterial Street Fund 105 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 36 Annual ArteNal Cradcseat Program CapiFal Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: ~ Unrestricted Street Revenue - - - - - - - Granfs - - - - - - - Arterial Street Fund 105 100,OD0 100,000 100,000 100,000 100,000 100,000 600,000 37 Local Street Preservation Program SOS Capital Costs 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Local Street Fund 103 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Subtotal. Preservation Proiects: Capital Costs 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 22,500,000 Funding Sources Unrestricted Street Revenue 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Arterial Street Fund 105 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 Local Street Fund 103 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Total Funding 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 22,500,000 SUMMARY: . CAPITAL COSTS Roadway Projects 21,993,500 16,173,500 7,375,200 13,625,000 7,840,000 2,730,000 69,737,200 Intersection Projects 164,700 107,300 1,817,000 1,936,500 236,000 2,336,000 6,597,500 Signal & ITS Projects 176,000 175,000 175,000 1,195,000 775,000 395,000 2,291,000 NonMotorized Projects 719,080 1,417,620 660,000 800,000 925,000 5,665,000 10,186,700 Prel. Eng. and Misc. Projects 156,000 25,000 25,000 - - - 206,000 Roadway Preservation Proj. 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 22,500,000 Total Costs 26,959,280 21,648,420 13,802,200 21,306,500 12,926,000 14,876,000 111,518,400 FUNDING SOURCES: Unrestricted Street Revenue 600,000 575,000 855,000 2,260,000 412,500 628,500 5,331,000 Traffic Impact Fees 2,559,200 960,700 310,700 709,500 632,000 516,900 5,689,000 Traffic Mitigation Fees - - 135,000 25,000 - - 160,000 Local Street Fund 103 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Arterial Street Fund 105 7,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 Grants 12,718,080 6,302,620 5,183,000 11,697,000 3,346,500 8,385,600 47,632,800 Other (GO Bonds) 4,256,000 - - - - - 4,256,000 Other (Storm Fund 432) 1,220,000 - - - - - 1,220,000 Other (Parks Fund 341) 1,000 - - - - - 1,000 Unrestricted Cap. Imp. Funds 180,000 20,000 180,000 20,000 180,000 20,000 600,000 Other (Redflex in Fund 328) 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Other (REET2 in Fund 328) 175,000 775,000 175,000 175,000 175,000 175,000 1,050,000 Other (Other Agencies) - 7,215,100 2,603,500 - 150,000 250,000 10,068,600 Other(Development) 1,350,000 2,500,000 460,000 2,520,000 4,130,000 1,000,000 11,960,000 Total Funding 26,959,280 21,648,420 13,802,200 21,306,500 12,926,000 14,876,000 711,518,400 Projects & Financing Plan Summary 11 City ofAuburn Transportation Improvement Program 2011-2016 Funding Allocation By Category Intersection. Projects, Signal & ITS $6,597,500 Projects, $2,291,000 NonMotorized - Projects, . . $10,186,700 y Roadway Projects, Prel. Eng. and . $69,737,200 : - . Misc:Imp., - $206;000 Roadway. _Preservation Proj., $22;500,000 2011-2016 Project Funding Sources Other (Parks Fund Unrestricted Cap. Im Funds, Other (Redflex in 341), $1,000 p' Fund 328), $600,000 Other ($torm Fund $1;200,000 Other (REET2 in - 432), Fund 328), $1,220,000 Other(Other $1,050,000 Other (GO Bonds), Agencies), $4,256,000 I $10,068,600 . Other (Development), ' $11,960,000 Unrestricted Street Revenue, Grants, $47,632,800 $5,331,000 , . ; Traffic Impact Fees, $5,689,000 Traffic Mitigation Arterial Street Local Street Fund Fees, Fund 105, 103, $160,000 $9,000,000 $13,200,000 12 Projects & Financing Plan Summary City of Aubum Transportation Improvement Program Financial Constraint & Fund Balance Summary 2011 2012 2013 2014 2015 2016 Unrestricted Street Revenue Begirining Fund Balance 592,000 527,000 487,000 177,000 (1,538,000) (1,395,500) Annual Revenue 535,000 535,000 545,000 545,000 555,000 555,000 Project Expenses 600,000 575,000 855,000 2,260,000 412,500 628,500 End of Year Fund Balance 527,000 487,000 177,000 (1,538,000) (1,395,500) (1,469,000)I Traffic Impact Fees Beginning Fund Balance 2,680,500 921,300 760,600 1,249,900 1,340,400 1,508,400 Annual Revenue 800,000 800,000 800,000 800,000 800,000 800,000 Project Expenses 2,559,200 960,700 310,700 709,500 632,000 516,900 End of Year Fund Balance 921,300 760,600 1,249,900 1,340,400 1,508,400 1,791,5001 Traffic Mitigation Fees BeginningFund Balance 235,000 235,000 235,000 100,000 75,000 75,000 AnnualRevenue - - - - - - Project Expenses - - 135,000 25,000 - - End of Year Fund Balance i 235,000 235,000 100,000 75,000 75,040 75,OU0 Local Street Fund 103 Beginning Fund Balance - - - - - - Annual Revenue 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 Project Expenses 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 End of Year Fund Balance - - - - - ' Arterial Street Fund 705 Beginning Fund Balance - - - - - - Annual Revenue 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Project Expenses 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 End of Year Fund Balance ' - - - - - - , Grants Secured Grants 8,726,000 - - - - - Unsecured Grants 3,992,080 6,302,620 5,183,000 11,697,000 3,346,500 8,385,600 Project Expenses 12,718,080 6,302,620 5,183,000 11,697,000 3,346,500 8,385,600 Other (GO Bonds) Annuai Revenue 4,256,000 - - - - - Project Expenses 4,256,000 - - - - - Other (Storm Fund 432) Annual Revenue 1,220,000 - - - - - Project Expenses 1,220,000 - - - - - Unrestricted Cap. Imp. Funds Annual Revenue 180,000 20,000 180,000 20,000 180,000 20,000 Project Expenses 180,000 20,000 180,000 20,000 180,000 20,000 Other (Redflex in Fund 328) Annual Revenue 200,000 200,000 200,000 200,000 200,000 200,000 Project Expenses 200,000 200,000 200,000 200,000 200,000 200,000 Other (REET2 in Fund 328) Annual Revenue 175,000 175,000 175,000 175,000 175,000 175,000 Project Expenses 175,000 175,000 175,000 175,000 175,000 175,000 Other (Other Agencies) Annual Revenue - 7,215,100 2,603,500 - 150,000 250,000 Project Expenses - 7,215,100 2,603,500 - 150,000 250,000 Other (Development) Annual Revenue 1,350,000 2,500,000 460,000 2,520,000 4,130,000 1,000,000 Project Expenses 1,350,000 2,500,000 460,000 2,520,000 4,130,000 1,000,000 Projects & Financing Plan Summary 13 City of Auburn Transportation Improvement Program ~ rT--- r ~ .y' ~ - ~ " -777 .~r f t•' _ . ~ r iv M Y(~ ~ ~P 14 Projects & Financing Plan Summary . City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capitai Facilities Plan, 2011-2016 Special Revenue Fund Project Titie: A Street NW, Phase 1(3rd St. NW to 14th St. N" TIP # 1 Project No: C207a0 Project Type: CapaCity Project Manager. Ingrid Gaub LOS Corridor ID# 18 Description: Construct a multi-lane arterial from 3rd St. NW to 14th St. NW. This project wili improve mobility and is tied to corridor development. It is consistent witM the Comprehensive Plan and contributes to the completion of a north/south arterial cortidor. The project length is approwmately three-quarters of a mile. The City purc.hased ROW from the northem properly owner. If the property develops, some or a portion of those funds may be reimbursed to the City (total cost was $251,000). Progress Summary: Pre-design was completed prior to 2007. Final design will be completed in 2010 along with the environmental process. Significant ROW purchase will begin in 2010. Construction is expected to be completed in 2011. Future Impact on Operating Budget: The annual maintenance cost for this project is,estimated to be $25,830. Budget 2010 vrDaauai 2011 10 eud9et Budget Ezpandtdires Budget Balance Adopted Budget - - - - Budget Amandmerns - - . Adjusted Budget - - - - ACtlVlty: (Previous Yrs) 2010 YE 2017 Yee[ End Total Project Funding Sourees: Prior to 2010 Estimate 2011 Bud et 2012 Budget Project Total Cost Unreshicted Street Revenue 277,457 - - - 277,457 277;457 , GraMs (Fed,State.locao 800,360 2.328,000 6,652,000 - 9,780,360 9,780,360 TrafficlmpactFees 20.5,259 503,300 216,500 - 925,059' 925;059 Other Sources (Developel' - 500,000 500.000 500,600 Totat Funding Sources: 1,283,076 2,831,300 7,368,500 - 11,482,876 17,482,876 Capihal ExpendiWres: Design 1,032,090 344,300 253,600 - 1,629,990 1,629.990 , , 2,647.986 RightofWay 250,986 2,397,000 - - 2,647,986, ConsWdion 90,000 7.114 900 7,204.900 7,204.900 7otal Expenditures: 1,263,076 2,831,300 7,368,500 - 11,48T,876 11,482,876 Forecasted Project Cost: Total Expendkures 2013 2014 2015 2016 2011-1016 B nd 2016 _ Funding Sources: UnrasMcted Sheet Revenue - - - - - - Grants (Fed,State.Locaq - - - 6,652,000 - ~ Trafic Impact Fees - - - - 216,500 - OtherSouices(Deve/oper)• 500,000 - Total Funding Sourees: - - - - 7,368,500 - Capital Ezpenditures: Design - - - - 253,600 - RightofWay - - - - - - Cortsbuction 7,114,900 ' Tafal Expendltures: - - - - 7,368,500 - Grerrts / Other Sources: 'Other funds indude developer contributions, ROW dedicadons, and consWction completed by others. Other funds shoum never go through the City. Approximately $3.2 Million of grdnts is stiq unsecured. Roadway Improvement Projects - 15 City of Auburn Transportation Improvement Program . ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facii'fies Plan, 2011-2016 Speaal Revenue Fund Project Titie: Auburn Way Corridor Imp. (4th St NE to 4th St SE) TIP # 3 Project No: c409a0 Project Type: Non-Capacity Project Manager. TBD LOS Corridor ID# 2-3 Description: This project is based on a pre-design study and is intended to improve pedesfian accessibility, appearance, and link the downtown area along Aubum Way South between 4th St NE and 4th St SE. This project may inGude some pavement repairs. Hawever, an overlay was completed as part of the City's Arterial Pavement Preservation Program in 2007. Afthough this, was consider!ed a temporary fix, the scope has been modified to account for the pavement woric. The project length is approximately a haff mile. Progress Summary: The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 riv aeeuai 2011 10 suagec Budget Ecpenditures Budget Batanee Adopted Budget • - - - - Budget Amendments Adjusted Budget - - - - AGt1Vlty: . 2010 YE 3011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Budget Project Total Ccst Umes6icted Street Revenue 78,251 - - - 78,251 788,251 Grdnts (Fed.State.Local) - - - - - 3,108,700 REET - - - - - - Treffic Impact Fees Other Sources Total Funding Sources: 78.251 - - - 78,251 3.896,951 Capital Expenditures: Design 78,251 - - - 78.251 696.951 RigMo/WaY - - - - - 200.DDO Consdvction - - 3,000,000 Total ExpendiWres: 78,251 - - - 78,251 3.896.951 Forecasted Project Cost: Totat Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sources: _ Unreshicted Sbeet Revenue 110,000 600,000 - - 710,000 - Grants{Fed,State,Local) 708,700 2,400,000 - - 3,108,700 - REET - - - - - Tiaffic Impad Fees Other Sources TotalFunding Sources: 818,700 3,000,000 - - 3,818;700 - Capital ExpendiWres: . Design 678.700 - - - 618.700 _ _ RigM of Way 200,000 - - - 200,000 ConsUuetion - 3,000,000 3,000,000 Total ExpendiWres: 818,700 3,000.000 - - 3,818,700 . Grants / Other Sources: GraM tunding is not secured. 16 Roadway Improvement Projects City of Auburn Transportation Improvement Program , ARTERIAL STREET FUND (102) capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 1 Street NE Corridor (40th St. NE to 52nd St NE) TIP # 4 Project No: c415a0 Project Type: CBpaCity Pmject Manager. TBD LOS Corridor ID# 21 Description: The final alignment of the I Street Corridor is being analyzed as part of the NortheastAubum Speaal Area Plan Environmental Impact Study. A partion of tfie ROW and Construction will be developer funded. The cross section will likely be a 54ane arterial per the citys Comprehensive Plan. The project lengfh is approximately three-quarters of a mile. This project may be split into two phases. Phase 1 would be 40th Street NE to 45th Street NE. Phase 2 would be 45th Street NE to 52nd Street NE (S. 277th Street). Progress Summary: This project is development driven. The project has been delayed due to the delay of the nearby pending development. Future Impact on Operating Budget: . The annual maintenance cost for this project is estimated to be $25,200. Budget: 2010 YTD Actual 2011 10 Budget Budget Expernlltures Budget Balance Adopted Budget - - - - Budget Amendmerrts - - - Adjusted Budget - - - - ACtIVIty: . . . . . (Previous Yrs) 2010 YE 2011 Year End Total Project Funding Sources: Prior to 2010 Estimate 2011 Bud et 2012 Budget Pro' ct Total _ Cost _ Unrestricted Sbeet Revenue 11,827 - - - 11,827 11.827 GraMS (Fed.State.t.ncao - - - - - - TraN'ic lmpad Fees - Other Sources (PoR ol Seattle) - - - - - 150,000 . OBrer Sources (Devebpmeirt) - - - - - 5,610,000 Total Funding Sources: 11,827 - - - - 11.827 5.771;827 Capital Expenditures: Design 10,957 - - - 10,957 470,957 RigM of Way 870 - - - 870 1,020,870 Construction 4,280 000 Total Expenditures: 11,827 - - - 11.827 5.771.827 Forecasted Project Cost: ` Total Ezpendkures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sourcea: Unreshicted Sbeet Revenue - - - - - - Grants (Fed.State,LocaQ - - - - - - TraRC lmpad Fees - - - - - - Other Souroes (PoK of Seattle) - - 150,000 - 150,000 - . Other Sources (Development) 460,000 1,020,000 4,130,000 5,610,000 - Total Funding Sourees: 460,000 1,020,000 4,280,000 - 5,760,000 - Capital Expenditures: Design 460A00 - - - 460,000 - RigMofWay - 1,020,000 - - 1,020,000 - Construc0'on 4,280,000 4,280,000 Total Expenditures: 460,000 1,020,000 4,280,000 - 5,760,000 - Grarrts / Other Sources: ` Roadway Improvement Projects 17 City of Aubum Transportation Improvement Program , ARTERIAL STREET FUND (102) Capital Faciuties Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: M Street Grade Separation (3rd St SE to 8th St SE) TIP # 5 . Projed No: C201a0 Project Type: Capacity Froject nnanager. Jacob Sweeting LOS Corridor ID# 6 Description: Construction of a grade separated railroad crossing of M St SE at the BNSF Stampede Pass tradcs. Progress Summary: The pre-design has been completed. 60% Design Drawings were completed in 2010. Right of way acquisition will occur in 2010 and construction is expected to start in 2011. Design work includes the lengthy environmental process and coordination with BNSF. Future Impact on Operating Budget The annual maintenance cost for this projed is estimated to be $21,827. Budget 2010 YTD actusi 2011 10 euaget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendments Ad%usted Budget - - - - ACtIVIty:. 2010 YE 2071 Yeaz End Total Projed Funding Sou~tes: Prior to 2010 Estimate 2011 Bud et 2012 Bud et Pro' Total Cost , Unresbicted Sheet Revenue - 150,000 - - 150,000 150,000 GraMs (Fed,State,LocaQ 122,500 749,900 615,000 5,385,000 1,487,400 6,872,400 , REE7'2 - 1,140,000 - - 1,140,000 1,140,000 TrafficJmpact Fees 893,321 1,547,700 1,500,000 661,400 3,941,021 4,602,421 ' Traffic Mi6'gation Fees - 660,000 - - 660,000 660,000 Other Sources (OMerAgencies)' 40,679 194,400 6,938,600 235,079 8,973,679 Total Funding Sourees: 1,056,500 4,442,000 2,115,000 12,985,000 7,613,500 22,398,500 Capkal Expenditures: Design 1,056,500 1,124,000 248,000 - 2,428,500 2,428,500 Right ofWay - 3,318,000 1,252,000 - 4,570,000 4,570,000 . Conshuction - - 615,000 12 985 000 615,000 15,400,000 Total Expenditures: 1,056,500 4,462,000 2,115,000 12,985,000 7,613,500 22,398,500 Forecasted Project Cost: ` Totat ExpendRures 2013 2014 2015 2016 - 2011 - 2016 Be nd 2016 Funding Sources• Unrestricted Street Revenue - - - - _ cranrs (Fed,srare.Locaq - - - - 6,000,000 - REE7'2 - - - - - - TrafficlmpactFees 2,161,400 - Traffic Mifigetion Fees - OfherSources(OfherAgenmes)' 7,800,000 r 8,738,600 Total Funding Sourees: 1,800,000 - - - 16,900,000 - Capltal Ezpenditures: Desi9n - - - 248,000 - Right af WaY - - - - 1.252,000 ConsWdion 1,800,000 15,400,000 Totai Expendifuras: 7.800.000 - - - 16.900,000 _ I GraMs / Other Sources: 'Fund'mg partners indude Port oF Seatde, Port of Tacoma, BNSF, PSE and more. 18 Roadway Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Faciitties Plan Six Year CapiYal Facilities Plan, 2011-2016 Special Revenue Fund Project Title: South 277th (Auburn Way North to Green River Bridge) TIP # 6 Project No: C222a0 Projed Type: CapaCity Project Manager. TBD LOS Corridor ID# 15 Description: This project includes major widening on S. 277th Street, inGuding the addition of three lanes, one westbound and two eastbound; a Class 1 trail, stortn, sewer and water improvements. The project length is nine-tenths of a mile. The final configuration will include three lanes eastbound and two lanes westbound. Progress Summary: The majority of this roadway is currently in the City of KenYs jurisdidion. Because the property served from the roadway is in the City of Aubum, the plan is to annex this portion of the roadway from Kent into the City of Aubum. The majority of this project is expected to be completed by adjacerrt developments. Future Impact on Operating Budget: The annual maintenance costs for this project is estimated to be $27,250. Budget: 2010 YTD Aetual 2011 10 Budget Budget Expenditures Budget Balance , Adopted Budget - - - - Budget Amendments - - Adjusted Budget - - - - Activity: (Previous Yrs) 2010 YE 2011 Year End ToffiI ProJed FurMing Sources: Prlor to 2010 EsUmate 2011 Budget 2012 Budget Project Totat Cost Unieshicted Street Revenue 19,085 - - - 19,085 19,085 Grants (Fed,State,locaq - - - - - 1,500,000 Tralf'ic Impad Fees - - - - - - Other (Developmern Funds) ' - - - - - 1,500,000 Other (Port of Seatt/e)"' - - 276,500 1,080,000 Total Funding Sources: 19,085 - - 276,500 19,085 4,089,085 Capltal Expendltures: Design 18,510 - - 276,500 18,510 498,510 Right of Way 575 - - - 575 350,575 Constnrction 3,250.000 Total Expendkures: 19,085 - - 276,500 19,085 4,099,085 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2071-2016 BeyorM 2016 Funding Sources: Un2sdicted Sheet Revenue , - - - - - Grarrts (Fed,State,locan - 1,500,000 - - 1,500,000 - Trafric /mpad Fees - - - - - - Other (Deve/opmerit Funds)' - 1.500,000 - - 1.500.000 - Other (Port of Seaft/e)" 803.500 - - ' 1,080,000 - Total Funding Sources: 803,500 3,000,000 - - 4,080,000 - Capkal EzpendlWres: • Design 203.500 - - - 480,000 - Right of Way 350,000 - - - 350.000 - ConsWction 250,000 3,000,000 3250,000 Total Ezpendkures: 803,500 3,000,000 - - 4,080,000 - Grants / Other Sources: 'Developer Tunds or in kind services. °Port of Seattle Wetland Mitigation Funds. GraM funding is not secured. Roadway Improvement Projects 19 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facitities Pfan Six Year Capital Facilities PIan,2011-2016 Special Reqenue Fund ProjectTitie: ` 15th Street SWReconstruction TIP # 7 ~ Project No: Cp7oooc Project Type: Non-Capacity Project Manager. TBD LOS Corridor ID# 12 Description: • This project was origina[ly scoped to include pavement preservation. The pavement preservation component could still be combined with this project, but is also eligible for the Arterial Pavement Preservation Program. This project should look to improve the railroad crossing grades as well as the vertical sight distance to the interurban trail to the west of the tracks. The cost estimate listed below is planning level cost. Progress Summary: Fbture Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 . trro aetual 2011 10 sudget Budget Ezpenditures Budget Balanee Adopted Bud9ef - - - - , • Budget Amendmerrts _ Adjusted Bud9et - - - - Activity: . 2010 YE 2011 Year Fsd Total Projed Funding Sources: Prior to 2010 Estlmate 2011 Budget 2012 Budget Projeet Total Cost Unrestricted Sheet Revenue - - - - - 575,000 Grams (Fed.State.Locaq - - - - - 2,800.000 REET - - - - - - TraA'ic M'digatlon Funds Other Total Funding Sourees: - - - - - 3,375,000 Capital Expenditures: Des9n - - - - - 375.000• Righi of WaY - - - - - - Construdlon - 3.000.000 Total Ezpendkures: - - • - - 3;375,000 Forecasted Project Cost: Total ExpendiGrms 2013 2014 2015 2016 2011-2016, Bq~ond 2016 Funding Sources: Unrestrided Street ReJenue 75,000 500,000 - - 575,000 - Grarrts (Fed;State,Local) 300,000 2,500,000 - - 2,800,000 - REET - - - - - - Tiatfic Mitigation Funds Other Total Funding Sourees: 375,000 3,000,000 - - 3,375,000 - Capital Expendltures: Design 375,000 - - - 375.000 _ Right of WaY - - - - - - Cons6ucdon - 3,000,000 3,000,000 - Total Expendldires: 375,000 3,000,000 - - 3,375,000 - Grarrts / Other Sources: GraM funding is unsecured. 20 Roadway Improvement Projects City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Fac~litJes Plan Six Year Capital FacilRies Plan, 2011-2016. Special Revenue Fund Project Title: A Street NW, Phase 2(W Main to 3rd St NVI) TIP # 8 Projed No: Cpxxxc Project Type: CapaCity Project Manager: . TBD LOS Corridor ID# 18 DescripUon: Construct a muki-lane arterial from W Main to 3rd St NW. This projed will conned A St NW, Phase 1 to the Sound TransR Station and the Central Business Distrid. This project may end up being funded all or in part by developers. The project lengfh is one fifth of a mile. Progress Summary: • The parking garage constructed by the Aubum Regional Medical Center completed a portion of this projed in 2009. Design is anticipated to begin in 2010. Futu.re Impact on Operating Budget: This projed will have no impact on the operating budge4 for street maintenance. Budget: 2010 YTD Adual 2011 10 Budget Budget Expenditures Budget Balanee - Adopted 8udget . Budget AmendmeMS - - Adjusted Budget - - - - Astivity: 2010 YE 2011 Year End Tofal Project Funding Soureas: Prior to 2010 Estlmate 2011 Budget , 2012 Budget Proect Total Cost Unrestricted Street Revenue - - - - - - Grants (Fed,SYate,Loca!) - - - - - 2,119,300 REET - - - - - - Trdflk /mpad Fees - 25,000 75,000 162,000 100,000 430,700 Other (Developer)' - - - - TotalFUnding Sources: - 25,000 75,000 182,000 100,000 2,550,000 Capifal ExperMiWres: Design - 25,000 75,000 162,000 100,000 262,000 Right of Way - - - - - - Conshudion 2.288,000 Total Expend'rtures: - 25.000 75,000 162,000 100.000 . 2,550,000 Forecasted Project Cost Total Expenelitures 2018 2014 2015 2016 2011-2016 Be nd 2016 Funding Sourees: - Unrestricted S6ee1 Revenue - - - - - - - crams(Feai.srare.Local) 2,119,300 - - - 2.119.300 REET - - - - Traihc Impact Fees 168,700 - - - 405,700 ' - Other (Developer)' - - Total Funding Sources: 2,288,000 - - - 2,525,000 - Capital Ezpenditures: Design - - - - 237,000 Righf of Way - - - - - Construction 2,288,006 2,288,000 Total Expenditwes: 2,288,000 - 2,525,000 - Grants / Other Souroes: Grarrt fund'mg sFiown is unsecured. 150K Developer in kind fundslservices support this project but do not pass though Roadway Improvement Projects 21 City ofAubum Transportation Improvement Program ARTERIAL STREET FUND (102) capnal Facilrties Plan Six Year Capital Facilities Plan, 2011-2016 Special. Revenue Fund Project Titte: D Street NW (37th St NW to 44th St NVI) TIP # 9 Projed No: Cpxoooc Projed Type: Cap2city Projed Manager. TBD LOS Corridor ID# 20 . DeseMpdon: ConsUuct a four-lane arteriai per the aty Comprehensive Plan. It will improve north/south mobility. ,This projectis tied to potential future development and will complete a majornorth/south arterial corridor from Ellingson Road SW (41 st Street SE) to S.:277th St. The D StNW project lengfh is approximately 0A2 miles. Progress Summary: - Future Impact on Operating Budget: 1'he annual maintenance cost for this projed is estimated to be $11,450. Budget 2010 Y7D Aewal 2011 10 Budgat ' Budget Expenditures Budget . . Balance Adopted Budget - - - - 8udget Amendmertts Adjusted Budget i - - - - ActiVity: 2010 YE ; 2011 Year End Total Project FurMing Sources: Prior to 2010 Estimate 2011 Bud et 2012 Budget Project Total Gost Unresficted SYreet Revenue - - - - - - Grarns (Fed,SYate,LocaQ - - - - - 4,320,000 , REET' - - - - - - Trafllc /mpact Fees - - - - - 2;080,000 ` Other _ Total Funding Sources: - - - - - 6,400,000 Capifal Expendifures: Desi9n - - - - - 1,150,000 Right of WaY - - - - - 1:750.000 Construdion 3 500 ODU Total EzpaMilures: - - - - - 6AO0.000 Forecasted Project Cost: - - rotal ExpenMitures 2013 2014 2015 2016 2011-2016 Beyond2016 ' Fundirtg Sources: Unresbicted Sheet Revenue Grants (Fed,Stete,locel) 160,000 160,000 320,000 4,000,000 REET - - - - - - TralTic Impect Fees - - 40,000 40,000 80,000 2,000,000 Other Total Funding Sourees: - - 200,000 200A00 400,000 6,000,000 Capital Expenditures: Design - - 200,000, 200,000 400,000 . ^ 750,000 Righto/Way - - - - - 1,750,000 Conshuction 3 500 000 Total Expenditures: - - 200,000 200,000 400,000 6,000,000 Granis / Other Sources: Grant Funding shown is unsecured. 22 Roadway Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Faciiities Plan ` Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project 7itle: F Street SE (4th St SE to Aubum Way S) TIP # 10 Project No: cp0911 , Project Type: CapaCity Project Manager: TBD Description: The F St SE project includes pavement reconstruction, installation of curbs, gutters, an 8-foot wide sidewalk on both sides, parking on one side, and a center tum-lane, as well as crash attenuation at the supports for the BNSF railroad bridge. This project improves mobility and safety along the corridor. The project length is approximately 0.3 miles. Progress Summary: Preliminary design and survey work was completed in 2009. Final design and construction are planned to be completed foltowing construction of the M Street grade separation project. . Future Impact on Opereting Budget: The annual maintenance cost for this project is estimated to be $4100. Budget: 2010 YTDActual 2011 10 Budget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmerrts - - Adjusted Budget - - - - Activity: 2010 YE 2011 Year End 7ota1 Project Funding Sources: Prfor to 2010 Estimate 2011 Budget 2012 Budget Proeet Total Cost Unrestricted Street Revenue - - - - - - Grants (Fed,State,Local) - - - - - 780,000 REET - - - - - - , Tralfic /mpact Fees 7,620 - - - 7,620 427,620 Other Total Funding Sources: 7,620 - - - 7,620 1,207,620 Capital Expenditures: Design 7,620 - - - 7,620 207,620 Right of Way - - - - - 60,000 r Construcdon - - - - 940,000 ~ Total Expenditures: 7,620 • - 7,620 ' 1,207,620 Forecasted Project Cost: ~ Total Expenditures 2013 2014 2015 2016 2011-2016 Be ond 2016 Funding Sources: Unresbicted Sbeet Revenue - - - - - - Grants (Fed,State,Local) - - 780,000 - 780,000 - REET - - - - - - Trafhc Impad Fees - 200,000 220,000 - 420,000 - Other Total Funding Sources: - 200,000 1,000,000 - 1,200,000 - Capital Expenditures: Design - 200,000 - - 200,000 - Righiof Way " - - 60,000 - 60,000 - Construc0ron 940,000 940,000 Total Expenditures: - 200,000 1,000,000 - 1,200,000 - Grants I Other Sources: Grant funding is unseared. Roadway Improvement Projects 23 City ofAuburn Transportgtion Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capitel Facilities Plan, 2011-2016 Special Revenue Fund Project TiUe: M Street NE (E Main St to 4th St NE) TIP # 11 ~ Project No: CplOOOc Project Type: Capacity Project Manager. TBD LOS Corridor ID# 5 Description: This project will construct a complete 4 lane street section on M St NE between E Main St and 4th St NE. Progress Summary: - Pre-design will be done in 2011 to refine project scope, alignment, and cost. Future Impad,on Operating Budget: The annual maintenance cost for this project is estimated to be $1,500. Budget: 2010 YTO aetuai 2011 10 eua9et ~ Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendments Adjusted Budget - - - - ActiVlty: ' 2010 YE 2011 Year End Total Projeet " Funding Sources: ' Prior to 2010 Estimate 2011 Budget 2012 Bud et Pro ed Total Cost Umes6icted Sfieef Revenue - - - - - - Grarrts (Fed.SYate,Local) - - - - - 1,122,500 REET - - - - - - Tiaffrc Impad Fees - - 50,000 , - 50,000 202,500 ' Other Total Funding Sourees: - • 50.000 - 50,000 1,325,000 Capital Expenditures: Design - - 50,000 - 50,000 125,000 RigMofWaY - - - - - 200,000 ConshucUon - 1,000.000 Total Expanditures: - - 50,000 - 50,000 1,325,000 Forecasted Projeat Cosf: Total Expenditures 2013 2014 2015 2016 2011-2016 B d 2016 Funding Sources: UnresVided SUeet Revenue - - - - - _ _ Grents (Fed;State,Local) - 225,000 897,500 - 7,122,500 - REET - - - - - - 7rafl'rc Impad Fees - 50,000 102,500 - 202,500 - Other Total funding Sources: - 275,000 1,000,000 - 1,325,000 - Capltal Expendkures: Design - 75,000 - - 125;000 - Right of Way - 200,000 - - 200,000 - Construction - 1,000,000 1,000,000 Total Expenditures: - 275,000 1,000,000 - 1,325,000 - Grants / Other Sources: Grant funding is unsecured. 24 Roadway Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project TiUe: Grade-Separated Crossing of BNSF Railyard TIP # 12 Projed No: Gplooot Projeet Type: CapaCity Project Manager. TBD Description: This project consists of a grade-separated crossing of the BNSF Railyard, either from SR-18 to 6th Street SE or from 15th Street SW to A Street SE. The first altemative would entail realigning the SR-18 eastbaund ramp, grade separating the main north/souffi line and the Stampede Pass line, and connec6ng to 6th Street SE. The second altemative would provide a new corridor from 15th Street SW to A Street SE in the vianity of 12th Street SE and 17th Street SE, either via an overpass or underpass of the BNSF Railyard. This project improves traffic flow significarrtly due to the potential developmeM of the BNSF yard as an intertnodal freight facility. Progress Summary: Future Impact on Operating Budget: Not scheduled for completion. until atter 2015. , Budget: 2010 YTD Aetual 2011 10 Budget Budget 6cpendiWres Budge! Balance Adopted Budget 8udget Amendments Adjusted Budget - - - - Activity: (Previous Yrs) 2010 YE 2011 Year End Total Projed Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Proeet Total Cost Unrestricted SUeet Revenue - - - - - Grarrts (Fed,State.LocaQ - - - - - - REET - - - - - - Traffio Impact Fees - - - - - - Other 32.000 000 Total Funding Sources: - - - - - 32,000A00 Capital Expenditures: Design - - - - - 3,500,000 , Right of Way - - - - - 4,000,000 Conshuction 24 500 OUO , Total Expenditures: 32,000.000 Forecasted Project Cost: rot~ai ExPenaia,* 2013 2014 2015 2016 2011-2016 Be ond 2016 Funding Sources: Unresdicted Sheet RevenuB - - - - - - Grants (Fed.SYate.LocaQ - - - - - - REEf - - - - - - Traffic lmpad Fees - - - - - - Other(Developer) - 1,000,000 1,000,000 31,000,000 Totat Funding Sources: - - - 1,000,000 1,000,000 31,000,000 Capital Ezpenditures: Design - - - 1,000,000 1,000,000 2,500,000 RigM of Way - - - - - 4,000,000 Constroction 24,500,000 Total Ezpenditures: - - - 1,000,000 11000,000 31,000,000 Grarrts / Other Sources: Roadway Improvement Projects 25 City ofAuburn Transportation Improvement Program ARTERWL STREET FUND (102) Capital Faciiities Pian Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Projea Title: West Valley Hwy Improvements (SR-18 to West Main Street) TIP # 14 . Projed No: cp0916 - Projed Type: CBpaCity Project Manager. Jacob Sweeting LOS Corridor ID# 35 • Deseription: This project will widen the roadway to accommodate an extension of the two way left tum lane, add curb 8 gutter; stortn drainage, repair failing roadway surface; install sidewalkon one side of the roadway, install city standard street lighting, improve bicycle accomodations, and install a new traffic signal at the intersection of West Main Street and West Vatley Highway. This project will improve the capaaty, safety, and driving comfort of the corridor as weli as reduce the amounYof time maintenance staffspends doing temporary repairs. Progress Summary: Design sterted in 2010 and construction is planned for 2011. Future Impact on Operating Budget: , This projed will have no impact on the operating budget for street maintenance. BUdgBt: 2010 YTD Actual 2011 10 Budget Budget Ezpendkures Budget Balanee , Adopted Budget - - - - Budget AmendmeMS Adjusted Budget - - - - AGtivrty: (Pravious Yrs) 2010 YE 2011 Year End ' Total.Projeet Funding Sources: Prior to 2010 Estimate 2017 Budget 2012 Budget ?ro eet Total _ Cost Unreshicled Strset Reveriue - - 55,000 - 55.000 55,000 GreMS (Fed.Stete.Loca!) 8.700. 261,300 2.730.000. - 3,000,000 3.000.000 REET 2 - 95,000 - - 95,000 95,000 Tralfic Mitigation Fees - 75,000 - - 75,000 75.000 ' TraJfic Impect Fees ~ - 25.000 530,000 - 555,000 555,000 Other (SYorm Fund) - - 1.220000 - 1 220,000 1,Y10 000 Total Funding Soureas: 8.700 456,300 4,535,000 - 5.000.000 51000,000 Capltal ExpendiWres: , Design 8,700 401.300 . 117,000 - 527,000 527,000 RigMolWaY - 55,000 - - 55.000 55,000 ' ConstrucNon - - 4,418,000 4,418,000 4,418,000 Total Ecpenditures: 8,700 456.300 4,535.000 - 51000.000 51000.000 Forecasted Project Cost: Total E:pendltures 2013 2014 2015 2016 2011-2018 Beyond 2016 . Funding Sourees: _ Unrestricted.SUeetRevenue - - - - 55,060 - GrarRS (Fed.Stete.Local) - - - - 2.730,000 - REET 2 - - - - - Tralfic Mitigation Fees - - - - - - TiafAc hnped Fees - - - - 530.000 - Other (Sform Fund) 1.220,000 Total Funding Sourcea: - - - - 4,g35.000 - Capifal Ezpendkures: Dest9n - - - - 117;000 - Righf of Wey - - - - _ Consbuction - 4,418,000 Total Fxpenditures: - - - • 4,535,000 - Granfs / Ottrer Sources: TIB Grant (secured). Other funding source is Storm 432 Fund. 26 Roadway Improvement Projects City ofAuburn Transportation Improvement Program , ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 8th Street NE Widening (Pike St to R St NE) TIP # 15 Project No: Cp7oooc Project Type: Capacity Project Manager: TBD LOS Corridor ID# 19 Description: Add eastbound lane to Southside of 8th St NE. Currently the lane exists from M St NE and drops as a right tum only lane at ' the intersection ofi8th St NE and Pike St. This would extend the lane to R St NE where it would then be a right tum only lane onto R St NE southbound. This is a planning level cost estimate. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 YTD Aewa1 2011 10 Budget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmertts - - Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Budget Project Total Cost UnresUicted Sheet Revenue - - - - - 290,000 Grants (Fed,State,Local) - - - - - 1,160,000 REET - - - - - - Traffic /mpact Fees - - - - - - Other Total Funding Sourees: • - - - ~ 1,450,000 Capital Expenditures: Design - - - - - 150,000 Right of Way - - - - - 300,000 Conshuction 1;000,000 Total Expenditures: - - - - - 1.450.000 Forecasted Project Cost: rotal Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sources: Unreshicted Street Revenue 90,000 200,000 - - 290,000 - Grarrts (Fed,SYate,Loca/) 360,000 800,000 - - 1,160,000 - REET - - - - - - Traffic lmpact Fees ' Other Total Funding Sources: 450,000 1,000,000 - - 1,450,000 - Capital Ezpenditures_ Design 150,000 - - - 150,000 Rightof Way 300,000 - - - 300,000 - Construction 1,000,000 1.000,000 Total EzpendiWres: 450,000 1,000,000 - - 1,450,000 - GrarMs / Other Sources: Grant funding is unsecured. Roadway Improvement Projects 27 _ City ofAuburn Transportation Improvement Program - ARTERIAL STREET FUND (102) Capital Facilities Pi-an Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 49th Street NE from Aubum Way North to M Street`NE TIP # 16 Project No: cpxooc Project Type: CapaCity Project Manager: TBD LOS Corridor ID# 29 Descriptfon: Construd easUwest carridor from Aubum Way North to M Street NE. The existing 49th Street NE extends westerly to B Street NE. This project also indudes a traffic signal at the intersection of Aubum Way North and 49th Street NE. This roadway was evaluated and recommended in the NE Special Planning Area. It is antiapated that this witl be constructed by future development. It is approximately 3/4 of a mile in length. _i Progress Summary: ~ Future Impact on Operating Budget: The annual maintenance cost for this projed is estimated to be $27,050. Budgef: 2010 rTOaetusi 2011 10 sud9ec Budget Expenditures Budget Balance Adopted Budget Budget Amendmerns Adjusted 8udget - - - • _ Aetivlty: (Previous Yrs) 2010 YE 2011 Year End Total Project , Funding Sources: Prfor to 2010 Estimate 2071 Bud et 2012 Budget Pro'ecfTofal Cost Unres6icted Stieet Revenue - 6rerhs (Fed,State.Locall REET - - - - - - TiatfiaMitigation Funds Othei (Deve/opmeM)' - 850,000 2,500,000 850,000 3,350,000 TotalFunding Sources: - - 850,000 2,500,000 850,000 3,350,000 Capltal Expenditures: Design - - 200,000 - 200,000 200,000 RigM of Way - - 650,000 - 650,000 650,000 ' Construdion - 2,500,000 2.500,000 Total Expenditums: - - 550,000 2,500,000 850,000 ' 3.350,000 . Forecasted Project CosL- Total Expenditures 2013 2014 2015 2016 2011-2018 doyonci 2016 _ Funding Soureas: Unrestrided Street Revenue _ Grar7s (Fed.State,Locaf) - - - - - - REET Trafl)c Mitigation Funds _ _ Other (Deve/opmenf)' 3,350.000 ' Total Funding Sources: - - - - 3,350,000 - Capital Expenditures: Design - - - - 200,000 - Right of Way 650,000 - Conshuction 2,500,000, Total Expenditures: - - - 3.850,000 - Grarrts / Other Sources: "Future developmerrt is expeded to tund and construct this projed. 28 Roadway Improvement Projects ' City ofAuburn Transportation Improvement Program CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Y.ear Capital Facilities Plan, 2011-2016 Capital Projects Fund ProjecrTide:. Traffic Calming Improvements TIP #33 Project No: Cp)oooc Project Type: Non-Capacity (Annual). Project Manager: Pablo Pard " Description: The Gitys Neighbofiood Traffic Calming Program was adopted by City Caunal in November of 2005. Staff receives complainls from , cit¢ens and then gathers data to confirtn that a speeding issue and/or cut through traffic issue is present. This money is for physical improvemeMS to the streets once ali ofher options have been exhausted. Physipl improvements may indude items such as lighitng, signing, striping, speed humps, speed tables, chicanes, traffic arcles, and median VeaUnents. Progress Summary: Future Impact on Operating Budget: BUdg6t: 2010 YTD AcWal 2011 10 Budget Budgef. Expenditures Budget Balanee Adopted.Budget - - - - Budget Amendmerrts - - Adjusted Budget - - - - . . ACt1V1ty: , . . . . . '(Previous 2 Yrs) 2010 YE 2011 Year End Total ProJeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Bud et Project Total Cosf Unresbicted Cap. improv. Revenue - - - - - - Grants (Fed.SYate.LOCaq - - - - - - REE'T 2 - - - - Other(Redflex) 477.900 225,000 200.000 200,000 842,900 1,842,900 Total Funding Sources: 417,900 225,000 200,000 200,000 - 842,900 1,842,900 Capital Expenditures: Design 42,000 25,000 20,000 20,000 87,000 187,000 Right ol Way - - - ' _ ' Constnuction 375,900 200,000 180,000 780,000 755.900 1,655,900 Total Expenditures: 417,900 225,000 200A00 200.000 842,900 1.842.900 Forecasted Project Cost: ~ Total Expenditures 2013 2014 2015 2016 2011-2016 Be ond 2016 Funding Sources: Urtrestricted Cap. Improv. Revenue - - - - - - Grants (Fed,SYate.Loca!) REET2 - - - - - - Other (Redllex) 200,000 200.000 200,000 200,000 1,200,000 - Total Funding Sourees: 200,000 200,000 200,000 200,000 1,200,000 - Capifal Ezpenditures: Design 20,000 20,000 20,000 20,000 120,000 - Right of Way - - - - - - ConsUUCtion 180,000 180,000 180,000 480,000 1,080,000 Total Expenditures: 200,000 200,000 200,000 200,000 1,200,000 - Grants ! Other Sources: RedHex money transferred from General Fund. Roadway Improvement Projects 29 City ofAuburn Transportation Improvement Program ' ARTERIAL STREET FUND (102) Capital Facilities Plan Six YearCapital Facilities Plan, 2011 2016 Special Revenue Fund Project Title: 124th Ave SE Corridor Improvements Phase 3 TIP # 39 ProjeCt No: CplOOOc : Project Type: CapaCity Project Manager. TBD LOS Corridor ID# 23, 25 Description: This project will fund the design, rigM of way acquisition, and consUuction of improvements to the signal¢ed intersedion ofSE 320th St and 124th Ave SE. Improvements. indude consVucting bike lanes, sidewalks; dual southbound left tum lanes into GRCC, and ITS. A porGon of this project is the main entrance to Green River Community College and.will require additional on-sRe improvements by GRCC. ~ . : Progre§s Summary: Future Impact on Operating Budget: This project will have no impad on the operating budget for streef maintenance. Budget:' 2010 YTD Actual 2011 10 Budget suaget Expenaiwre8 Budget Bel8nee Adopted Budget - - - - Budget Amendments - - Adjusted Budget - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Bu et Pm eet Total CosE Unres6ided Sbeef Revenue - - - - - - GraiKs (Fed,SYate.Local) - - - - - 735.000 Tralfic Jmped Fees - - - - - 115.000 Other , Total Funding Sourees: gyp ppp Capltal ExpandlWres: Desi9n - - - - - - RfgM of Way - - - - - 135,000 Cons6uc6on 715,000 Total Expendkures: ' - - - - • 850,000 Forecasted Project Cost: Total Fxpenditures 2013 2014 2015 2016 2011 - 2016 Beyond 2016 Funding Sources: Unrestrided Street Revenue - - - - - - Grants (Fed,SYate,LocaQ - - 85,000 650,000 735,000 - Trafficlmpad Fees - - 15,000 100,000 115,000 - Other Total Funding Souroes: - - 100,000 750,000 850A00 - Capital Expenditures: ' Desi9n - - - - - Rightof Way - - 85,000 50,000 135,000 - Construction 15,000 700,000 . 715,000 Total Ezpendttures: 700,000 750,000 8501000 - Grants / OthecSources: GraM Funding is unsecured. 30 Roadway Improvement Projects City of Aubum Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 124th Ave SE Corridor Improvements Phase 1 TIP # 40 Project No: Cpxocx Project Type: CapaClty Project Manager. TBD LOS Corridor ID# 23 Description: , This project wiil fund 4he design, rigM of way acquisition, and construction of a 41ane section with bicycle and pedestrian faalities on 124th Ave SE between SE 318th St and SE 312th St. Progress Summary: , Pre-design is planned for 2012. Future Impact on Operating Budget: This project wiil have no impact on the operating budget for street maintenance. BudgBt: 2010 YTD Actual 2011 10 Budget Budget Ezpemlkures Budget Balance Adopted Budget - - - - Budget Amendments - Adjusted Budget - - - - Activify: 2010 YE 2011 Year End Total Project Funding Sourees: Prior to 2010 Estimate 2011 Bud et 2012 Bud et Project Total Cost Unrestnded Street Revenue - - - - - - Grants (Fed,State,LocaQ - - - - - 1,690,000 Traffic lmpact Fees - - - 50,000 - 26D,000 Other Total Funding Sourees: - - - 50,000 - 1,950,000 Capital Expendihures: - Design - - - 50,000 - 200.090 Right of Way - - - - - 250,U00 ' Construction 1,500,000 Total Expenditures: • - 50,000 - 1,950,000 Forecasted Project Cost: Total Experrcl'Rures 2013 2014 2015 2016 2011-2016 ond 2016 ~ Funding Sources: . Unrestrtded Sbeat Revenue - - - - G2rns (Fed.State.Local) 125,000 1,565,000 - - 1,690,000 - Traffic Impact Fees 25,000 185,000 - - 260,000 - Other Total Funding Sourees: 150,000 1,750,000 - 7,950,000 - Capital Expenditures: Design 150,000 - - - 200,000 - Right of Way - 250,000 - - 250.000 - Conshuction 1.500,000 1.500.000 Total Expendihires: 150,000 1,750,000 - - 1.950,000 . Grants / Other Sources Grant funding is unsecured. Roadway Improvement Projects . 31 City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 124th Ave SE Corridor Improvements Phase 2 TIP # 41 Project No: Cpxooc ; Project Type: C8p8C'tty Project Manager: TBD LOS Corridor I.D# 19, 23 Description: This project will fund the design, right of way acquisition, and construction of improvements to the signalized intersedion of SE 312th St and 124th Ave SE. Improvements inGude adding bike lanes, dual westbound left tum lanes, dual southbound thru lanes, northbaund right tum pocket, ITS and pedestrian safetyimprovements. Progress Surrmmary: Pre-design is scheduled for 2013. Future Impact on Operating Budger , This projed will haye no impad on the operating budget for street maintenance. Budget: 2010 YT'D Actual 2011 10 Budget. Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmerrts Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Totai Projeet Funding Sources: Pdor to 2010 Estimate 2011 Budget 2012 Budget Pro'ect Totai Cost Unres6icted Sbeef Revenue - - - - - - Grarrts (Fed.State.Loca1) - - - - - 965.000 Traffic lmpad Fees - - - - - 215,000 Other Total Funding Sources: - - - - - 1,180,000 Capital Expenditures: Design - - - - - 80,000 RigM of Way - - - - - 100,000 Eonstrudion 1,000,000 Total Expenditures: - • - - - 1,180,000 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011 - 2016 Beyond 2016 Funding Sources: Unrestrided.Slraet Revenue - - - - _ Grants (Fed,Stafe,Locaf) - 100,000 865,000 - 965,000 - Tialfic lmpad Fees 30,000 50,000 135,000 - 215,000 - Other Total Funding Sources: 30,000 150,000 1,000,000 - 1,180,000 - Capital Ecpenditures: Design 30,000 50,000 - - 80,000 - Right otWay - 100,000 - - 100,000 - Constroction 1,000,000 1,600,000 Total Expenditures: 30,000 150,000 1,000,000 - 1,180,000 - Grants / OtherSources: Grant tunding is unsecured. 32 Roadway Improvement Projects City of Aubum Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Ptan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Projea Titie: SE 320th Street Corridor Improvements TIP # 42 Projed Na Cploooc Project Type: Capacity Project Manager. TBD LOS Corridor ID# 23, 25 . Description: This project will fund the design, right of way acquisition, and construction of a 3 lane roadway with bicyGe and pedesVian faali4ies on SE 320th St between 124th AveSE and the westem enVance to GRCC. Progress Summary: Future Impact on Operating Budget: This project will have no impad on the operating budget for street maintenance. ; Buaget: zoio . rro nca,ai zo„ ,o sud9et ' Budget EzparMitures Budget Balance Adopted Budget - - - - Budget Amendments - - - - Adjusfed 8udget - - - - AGtivltr. 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estlmate 2011 Budget 2012 Bud et Pmject Total Cost Unreshided.SdeetRevenue - - - - - - Grants (Fed.SYate.LocaQ - - - - - 553.600 Tralfie Impad Fees - - - - - 116,400 PWTFL Other Total Funding Sources: 670,000 Capital EzpendiWres: Design - - - - - 90.000 ' Right of Way - - - - - 60,000 Construdion 520,000 Total Expenditures: 670,000 Forecasted Project Cost: Total Ezpenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 . . Funding Sources: UnresUided Sdeet Revenue - - - - - - Grdnts (Fed,S[ate,Locan - - 51,500 502,100 . 553,600 - Traffic Impad Fees - 30,000 8,500 77,900 116,400. - PWTFL - - - - - - ' Other Total Funding Sourees: - 30,000. 60,000 580,000 670,000 , Capital Ecpenditwes: Design - 30,000 60,000 - 90,000 - Right of Way - - - 60,000 60,000 - ConsUtlcBon 520,000 520.000 - Total Expenditures: - 30,000 60,000 580,000 670,000 - Granis / Other Sources: Grant funding is unsecured. Roadway Improvement Projects 33 City ofAuburn Transportation lmprovement Program LOCAL REVITALIZATIOiV FUND. (330) Capital Facilities Plan , Six Year Capital, Facilities Plan, 2011:2016 Capital Projeds Fund Project Tiue: Downtown Promenade Improvements TIP # 52 Projed No: Cp1005 Projed Type: Non-Capacity Project nnanager. Ryan Vondrak/Elizabeth Chamberlain Deseiiption: This project will fund the design, coordination, perrnitting and constniction of Downtown Promenade improvements. Projed indudes stortn, sewer, water and roadway improvemeMS of Division Street between Main St and 3rd 8t SW/SE. - - P~oqress Summarv: . Design and construction will be completed in 2011. Futu?e Impact on Operating Budget: This project will have no impact on.tFie operatingbudget.for street maintenance. Budget: 2010 rro aawai 2011 10 sudget Budget Expendkures Budget Balanee ~ Adopted Bud9et. - - - Sudget Amendmerts - Adjusted Budget /1Cdvity: - (Previous Yis) 2010 YE 2011 Year End Total Projeet, Funding Soureea: Prior to 2010 Estimate 2011 Bud t 2012 Budget Pro ed Total _ Cost Unrestricted SUeet Revenue - - - _ Grarrts (Feder4, 456,000 2,544.000 - 3,000.000 3.000,000 REET2 - - - - _ OUier (GO Boncg - 744 000 4,256 000 5,000 000 5.000,000 Totsl Funding Sources: - 1,200,000 , 6,800.000 8,000,000 8,000,000 Capitat Expenditu►es: Deslgn - 1,200,000 131,000 - 1,331,000 1,331,000 ~ Right of Way - - ' _ Conshuetion - 6,669,000 6,669,000 6,669,000 Total Expenditures: - 7,200,000 6,800,000 - 8,000.000 8,0OO,000 Forecasted Project Cost: Total Ezpendftures 2013 2014 ' 2015 2016 2017-2016 ond 2016 Funding Soureea: Unrestricted S6eet ReVenue _ _ Grants (Federal) - - - - 2,544.000 - REET2 - - - - Other (GO Bond) - - 4,256,000 Total Funding Sources: - - - - 6.800,000 _ Capltal EzpendlWres: D-9^ - - - - 131,000 - , Right of WaY - - - - - _ ConsUUCfion - 6,669.000 Total Expendltures: - - - - 61800,000 - ~ Grants / Otlier Sources: Grant Funding is Federal EDA GraM. Other Funding is Local Revitaf¢ation Funding GO Bond revenue. 34 Roadway Improvement Projects Gity ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital FacllfUes Pian, 2011-2016 Special Revenue Fund Project Taie: Harvey Road & 8th Street NE Intersection Improvements TIP # 17 Project No: cp0611 ProjectType: CBpacity Project nnanager. Jacob Sweeting LOS Corridor ID# 5,19 Description: Add one eastbound throughlright tum lane on 8th St NE approaching Harvey Rd. Modify traffic signais and traffic channel¢ation to accommodate the new lane. The additional lane will improve traffic delays and vehicle queuing at the intersection of liarvey Rd and 8th St NE in all directions. This projed will reconstruct M St NE from 4th St NE to 8th St NE, a segment of roadway approximately 0.3 miles in length with four travel lanes. The reconstruction will fix the existing poor pavement condition and fill in any gaps in the sideviralk network.. Progress Summary: Project was completed in 2010. Ongoing budget is for PWTFL debt payments. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 YTD Aetual 2011 10 Budget . Budget Expenditures Budget Balanee Adopted Budget - - - - 8udget Amendments - Adjusted 8udget - - - ACtlvity: • 2010 YE 2011 Year EM Total Projeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Pro d Total Cost Unrestrided Street Revenue - - - - - 1.082,000 GraMS (Fed,State.Locao - - - - ` - Traffic Impact Fees 199,509 91.000 87,700 87,300 378.209 725,009 PWTF 1,506,873 20,400 - - 1,527,273 1,577,273 Other (430,431,432 Funds) 310,060 - 310,060 310,060 Total Funding Sourees: 2,016,442 111,400 87,700 87,300 2,215,542 3,644,342 Caplfal Fxpendltures: Design 326,496 - - - 326,496 326,496 RightofWay 186,479 10,000 - - 196,479 196,479 Cons6udion 1,503,467 15.400 - - 7,518.867 1,518,867 ~ Long Tertn De6t - PWTF - 86.000 87,700 87.300 173.700 1,602.500 Total Expendkures: 2.076,442 111,400 87,700 87,300 2,215,542 • 3,664,342 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 B nd2016 Funding Sourees: . Unrestricted Street Revenue - - - - 86,000 86,000 996,000 Grarrts (Fed.State.Local) - - - - - - TratBc Impact Fees 87,000 86,500 86,000 - 434,500 - PWTF - - Total Funding Sourees: 87,000 86,500 86,000 861000 520,500 996,000 Capkal Expenditures: Design - - - - - - RightofWay - - - - - - ConsVUdion - - - - - - Long Term Debt - PWTF 87.000 86.500 66.000 86,000 520,500 996.000 Total Fxpenditures: 87.000 86.500 66,000 86,000 520.500 996,000 Grants / Other Sources: Ofher funding is Ciry Sewer, Water 8 Stortn Funds Intersection Improvement Projects 35 Ciry ofAuburn Transportation Improvement Program I ARTERIAL STREET FUND (102) capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 8th Street and R Street NE Traffic Signal TIP # 18 Project No: cp0701 Project Type: Non-Capacity Intersection Improvement Projea Manager. Ryan Vondrak LOS Corridor ID# 19 Description: , This project inGudes the construction of a new traffic signal at the intersection of 8th St NE and R St NE. Intersection improvements will indude crosswalks and pedestrian signals. This project was selected on acadent history, surrounding land uses; and pedestrian flow pattems. Progress Summary: The design began in 2007, with construdion scheduled for 20.10. Future Impact on Operating Budget: The annual maintenance cost for this projed is estimated to be $6,600. Budget: 2010 vro noeuai 2011 10 eud9et Budget Expendltures Budget Balance Adopted Budget - - - - Budget Amendments Adjusted Budget - - - - , Activity:. 2010 YE 2011 Year End Total P►41'eet . Funding Sourees: Prior to 2010 Estlmate 2011 Budget 2012 Budget Projeet Total . Cost UnresVicted SYieef Revenue . 12,300 385;100 1,000 - 398,400 398,400 GrarRs (FederaQ 129,500 120,500 - - 250,000 250.000 REET - - - - - - Traffic Impact Fees - - - - - - Other Total Funding Sourees: 141,800 505,600 1,000 - 648,400 648,400 Capital Expenditures: Design 138,950 65,000 - - 203,950 203,950 RigM of Way 2,850 - - - 2.850 2.850 Conshudion 440,600 1,000 441600 441600 Total Expendlhires: 141,800 505.600 1,000 - 648,400 648,400 Forecasted Project Cost: , Totaf ExpendiNres 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sourees: Unrestricted Street Revenue - - - - 1,000 - G2nts (Federal) - - - - - - REET - - - - - - Traffic Impact Fees - - - - - - Other Total Funding Sources: - - - - 1,000 Capital Ezpenditures: . Desf9n - - - - - - RigM of Way - - - - - - Constrttdion 1,000 Total Expenditutes: - - - - 1,000 Grants I Other Sources: Grant is Federal Intersection 8 Cortidor Safety Grant. 36 Intersection Improvement Projects City ofAuburn Transportation Improvement Program 1 ' ARTERIAL STREET FUND (102) Capital Facilities Plan Six YearCapital Facilities Plan, 2011-2016 Special Revenue Fund Project TiUe: Auburn Way North / 1st Street NE Signal Improvements TIP # 19 Project No: Cp7oooc Project Type: NOn-CapaCity Project Manager. TBD LOS Corridor ID# 2 Description: This project will consUuct a new complete traffic signal with controller cabinet and battery backup along with necessary intersection improvements. . Progress Summary: Predesign will be completed in 2012. Final design and construction is planned for 2013. . Euture Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 YTD Actual 2011 10 Budget Budget; Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmerits - - - Adjusted Budget - - - - Activity: 2010 YE - 2011 Year End Total.ProJeet , Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Bud et Project Total Cos! . Unresdicted Sheet Revenue - - - 20,000 - 150.000 Grants (Fed,Stafe,Local) - - - - - 450,000 Traffic lmpacf Fees - - - - - - Other . ToYal Funding Sourees: ~ - - 20,000 - 600,000 Capkal EzpendiWres: Design - - - 20,000 - 100,000 Right of Way - - - - - 50,000 ConsUuction 450.000 Total Expenditures: - - - 20,000 - 600,000 . Forecasted Project Cost: Total EzpendiWres 2013 2014 2015 2016 2011-2016 Beyond 2016._ . Funding Sources: , . Unresbicted SYreet Revenue 130,000 - ' - - 150,000 Grants (Fed,State,Local) 450,000 - - - 450,000 - Tra(fic Impad Fees - - - - - - Other Total Funding Sources: 580,000 - - - 600.000 - Capital Expendlturesr Design 80,000 - - - 100,000 - Right of Way 50,000 - - 50,000 - ' Construction 450,000 450,000 ToYal Expenditures: 5130,000 - - - 600,000 - Grants / Other Sources: Grant funding is urisecured. Intersection Improvement Projects 37 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2076 SpeciaP Revenue Fund Project TiUe: Aubum Way South and M Street SE Intersection Imp. TIP # 20 Project No: Cploooc Project Type: CapBCity Project Manager. TBD LOS Comdor ID# 3,4 Description: Gonstruct a westbound to northbound rigM tum pocket at the irrtersection of Aubum Way S and M St SE. This projed would also improve the tuming radius at this same comer allowing drivers to make a safe right tum on red (after stopping and yielding to oncoming vehides). Currenty the intersection geometry has necessitated the Gity plaang a legal restriction on this movement. Progress Summary: . . . Pre-design is antiapated to begin in 2011 and be completed in 2011. Construction will be completed when funding is secured. Future Impact on Operating Budget: , This project>will have no impact on the operating budget for street maintenance. Budget: 2010 rm accuai 2011 10 sud9et, Butlget . Expenditures Budget Balance Adopted Budget ' - - - - Budget Rmendmerrts - Adjusted Bud9et - - - , ACtlvlty: `2010 YE . 2011 Year Enif Totel ProJeet Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Budget PmjeG Total ' Cost Unresbicted Street Revenue, - 25,000 75,000 - 100,000 100,000 Grerrts (Fed,SYate.Loca/) - - - - - 765,000 REET - - - - - _ . Tiafl'ic MIBgaGon Funds - - - - - 135,000 Other Total Funding Sourees: - 25,000 75,000 - 100,000 1,000,000 Capital Fxpenditures: Design - 25,000 75,000 - 100,000 100,000 RigM of Way - - - - 100.000 Constructlon - 800.000 Total Expenditures: - 25,000 75,000 - 100,000 1,000,000 Forecasted ProjectCost: . Total Fxpenaip,res 2013 2014 2015 2016 2011-2016 B ond 2016 Funding Sourees: Unres6icted Streei ReDenue - - - - 75,000 - GrarKS (Fed,SYate,Local) 765,000 - - - 765,000 - REE7. - Tralfic Mitigation Funds 135.000 135,000 - Other Total Funding Sources: 900,000 - - - 975,000 - ' Capltal Expendlturas: Desi9n - - - - 75,000 - RrgM of Way . 100.000 - - - 100,000 - ' Conshuction 800,000 800,000 Total Expendlturesc 900,000 • - - 975,000 Grants / Other Sources: Grant funding is unseared. 38 Intersection Improvement Projects Ciry of Auburn Transportation Improvement Program ARTERIAL STREET fUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011+2016 Special Revenue Fund Project Tine: C Street NW and West Main Street TIP # 21 Project No: Cploocx Project Type: Non Capacity Project Manager. TBD LOS Corridor ID# 11 Description: Reconstruct intersection at G St NW and W Main St. Project would inGude a new traffic signal and modifications to the tuming radii at each comer to help faalitate vehicular movements. Ttie new traffic signal would allow for protected left tum phasing for northbound and southbound left tum movements. This would also provide additional safety related to the rdilroad pre-emption. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the opera6ng budget for street maintenance. Budget: 2010 YTD AeWal 2011 10 Budget Budget EzperMitures Budget Balance Adopted Budget - - - - Budget Amendments Adjusted Budget - - - - /4Gtiwty: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimabe 2011 Budget 2012 Budget Projeet Total Cost UnresMcted Sbeet Revenue - - - - - 220,000 Grants (Fed,State,LocaQ - - - - - 880,000 REET - - - - - - Traffic /mpact Fees - - - - - - Other - Total Funding Sources: - - - - - 1.109,000 Capital Ezpenditures: _ Design - - - - - 100,000 Right of Way - - - - - 550,000 Construction 45D 000 ToWI Ezpendltures: - - - - - 1,100,000 Forecasted Project Cost: . Total. Expenditures 2013 2014 2015 2016 2077 -20'IB Beyond2016 Funding Sourees: Unrestricted Shaet Revenue 20.000 200,000 - - 220,000 - Grants (Fed,State,Local) 80,000 800,000 - - 880,000 - REEf - - - - - - Traffic /mpact Fees - - - - - - Other 7otal Funding Sources: 100,000 1,000,000 - - 1,100,000 - Capital Expenditures: Design 100,000 - - 100,000 - Right of Way - 550,000 - - 550,000 - ConsWction 450,000 450,000 Total Ezpenditures: 100,000 1,000,000 - - 1,100,000 - Grants / Other Sources: Grant Funding is unseaired. Intersection Improvement Projects 39 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan , Six Year Capital Eacilities Plan, 2011-2016 Special Revenue Fund. Project Title: F Street SE & 4th Street SE Traffic Signal TIP # 25 Project No: cp0914 Project Type: Non-Capacity Intersection Improvement Praject Manager. JaCOb Sweeting Description: This projecfincludes the construction of a new Vaffic signat at the intersection of 4th St SE and F St SE. Intersection improvements wili indude crosswalks and pedestrian signals. This project was seleded based on accident history, traffic wlumes, and pedestrian flow pattems. Progress Summary: Preliminary design will begin in 2009. Final design and construction will be completed in 2010. Future Impact on Operating Budget: The annual mairrtenance cost for this projed is estimated to be $6,600. Budg@t: 2010 YTD Aetual 2011 10 Budget Budget Expenditures Budget Balance Adopted 8udget Budget AmerodmeMs Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimabe 2011 8udget 2012 Budget Projeet Total Cost Unreshicted S6eef Revenue - - 1,000 - 1,000 1,000 GranGs (Fed,SYate,Loca!) 4,155 392,545 - - 396,700 396,700 REET - - - - - - PWTFL - - - - - - Other Total Funding Sources: 4;155 392,545 1,000 - 397,700 397,700 Capital Expendkures: Design 4,155 55,845 - - 60,000 60,000 Right of Way - - - _ _ _ Constroction 336,700 1,000 337,700 337,700 Total Expanditures: 4;155 392,545 1,000 - 397,700 397,700 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011 - 2016 Be nd 2016 Funding Sources: Unrestnded Street Revenue 1,000 _ Grants (Fed, State, Local) REET - - - - - - PWTFL - - - - - Other Total Funding Sourees: - - • - 1.000 . Capital Expendkures: Design Right of Way _ _ Construction , - 1,000 Total Expendkures: 1.000 - Grants / OtherSources: Grarrt a Federal HSIP Tunded and does not require a city match. 40 Intersection Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: Railroad Crossing Safety Improvements TIP # 38 Project Na Cp70cxx Project Type: Intersection Safety (Non-Capacity) Project Manager. TBD Description: This project will fund the design, coordination, permitting and construction, of Quad gates at the W Main St, 3rd St NW, and 37th St NW BNSF Railroad crossings. Progress Summary: Future:lmpacf on Operating Budget: The annual maintenance cost for this project is estimated to be $1,000. Budgef: 2010 YTD Actual 2011 10 8udget Budget ExpendiWres Budget Balance Adopted Budget - - - - Budget AmendmeMS - - - - Adjusted Budgef Activity: 2010 YE 2011 Year End Total Project Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Projeet Total Cost Unrestncted Street Revenue - - - - - 135,000 Grants (Fed,State,Local) - - - - - 865,000 REET - - - - - - Other ToWI Funding Sources: • - - • • 7,000,000 Capital ExpendiWres: - Design - - - - - 150,000 Right of Way - - - - - - Conshuction 850,000 Total Expenditures: 1,000,000 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sources: Unrestdcted Street Revenue 25,000 11p,000 - - 135,000 - Grants (Fed,Stafe,Local) 125,000 740,000 - - 865;000 - REET - - - - - - Other TotalFunding Sources: 150,000 850,000 - - 1,000,000 - , Capital Expenditures: Design , 150,000 - - - 150,000 - Right of Way - - - - - - Construction 850,000 850,000 Total ExpendiWres: 150,000 850,000 - - 1,000,000 - Grants ! Other Sources: Grent funding is unsecured. _ , Intersection Improvement Projects 41 City ofAuburn Transportation Improvement Program ARTERIAL $TREET FUND (102) Capitai Facilities Plan Six Year CapiYal Facilities Plan, 2011-2016 Special Reqenue Fund Project Tifle: Auburn Way South & Riverwalk Intersection Improvements TIP # 43 Project Nca CpX)ooc Project Type: CapaCity Project Manager. TBD LOS Corridor ID# 4 Description- This project will fund the design, right of way acquisition and construction of intersedion capacity and safety improvements at Aubum Way S and Riverwalk Dr SE. This project will include creating eastbound/westbound dual left tum lanes, auxiliary signal heads and pedestrian safety enhancements: Progress Summery: Future Impact on Operating Budget: This;project will have no impact on the operating budget for street maintenance. Budgetc 2010 YTD Actual 2011 10Budget BudgM Expenditures Budget Balance ° Adopted Budget Budget Amendments Adjusted Bud9et - - - - ACtivity: - 2010 YE 2011 Year End Total Projed Funding Sources: Prior W 2010 Estimate 2011 Budget 2012 Budget Projeet Total Cost Unrestricted Street Revenue - - ' - - - - Granfs (Fed,State.LocaQ - - - - - 2,076,000 Tratfic /mpact Fees 324,000 PWTFL _ Other Total Funding Sources: - - - - 2,400,000 CapiWl Ezpenditures: Desi9n - - - - 150,000 Right of Way - - - - - 200,000 Construction - - - 2.050.000 Total Ezpenditures: 2,400,000 Forecasted Project Cost: Total ExpendiWres 2013 2014 2015 2016 2011-2016 B ond 2018 Funding Sources: Unrestricted Street Revenue - - - _ _ Grants(Fed,State,Local) - - 125,000 1,951,000 2,076,000 - Trafhc Impad Fees - - 25,000 299,000 324,000 - PWTFL - - - - - - Other Total Funding Sourees: - - 150,000 2,250,000 2,400,000' - Capital Expendkures: Design - - 150,000 - 150,000 - Right of Way - - - 200,000 200,000 - Conshuction - - 2,050,000 2,OSD.000 Total Expendkures: - - 150,000 2,250,000 2,400,000 - Grants / OtherSources: Grarrt funding is unsecured: 42 Intersection Improvement Projects City o, f Aubum Transportation Improvement Program ARTERIAL'STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund ProjectTiGe: South Auburn Intelligent Transportation System (ITS) Expansion TIP # 13 Projed No: cp1004 Project Type: CapaCity Project Manager. Jacob Sweeting LOS Corridor ID# 10,12,13, Description: The S Aubum ITS Expansion project includes connecting and providing new ITS infrastrudure on 15th St SW, C St SW and A St SE. It also includes 6th St SE, A St SE and 41st St SE, (Ellingson Road). This ITS expansion will be acxomplished through existing conduits recently installed under capital improvement projects, and with wireless line of sight options. With this extension and additional equipment the project adds an additional 14 signals to the exis6ng central signal system and brings back new cameras along 4hree heavily congested comdors. Progress Summary: Project will be designed and constructed in 2010. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be.$5000. In addition, staff time will be required upon completion of the qroject to monitor the system. Budget: 2010 rro aca,at 2011 10 eudset Budget Expenditures Budget Baiartce Adopted Budget - - - - Budget AmendmeMS - - - Adjuffied Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Project Total Cost UnrestridedStreetRevenue - - 1,000 - 1.000 1,000 Grants (Fed,SYate,Locao - 693,400 - - 693,400 693,400 REET - - - - - - Traffic Midgation Fees - 710,000 - - 110,000 110,000 Other Total Funding Sources: ' • 803,400 1,000 - 804,400 804,400 Capital Expenditures: Design - 40,500 - - 40,500 40,500 Right o/ Way - - - - - - Construction 762,900 • 1,000 763,900 763,900 Total Expenditures: - 803,400 1,000 - 804,400 804,400 Forecasted Project Cost: Total Expenditures 2013 2014 . 20'15 2016 2011 -2016- Beyond 2016. Funding Sources: UnreshictedS6eetRevenue - - - - 1,000 - GranGs (Fed,State,Locaq - - - - - REET - - - - - - • Traffic Mitigation Fees - - - - - - Other Total Funding Sources: - - - - 1,000 ' Capital Ecpenditures: Desi9n - - - - - - Righf of Way - - - - - - Conshudion - 1,000 Total Eupenditures: - - - - 7.000 - Grarrts ! Other Sources: Grant Funding is CMAQ and requires a 13.5% city match. Traffic Signal & Intelligent Transportation Systems Improvement Projects 43 City ofAuburn Transportation Improvement Program CAPITAL IMPROVEMENT FUND (328) Capital Faciiities Plan ~ Six Year Capital Facilities.Plan, 2011-2016 Capital Projects Fund Project'rrtle: Traffic Signal lmprovements TIP #34 Project No: Cploooc . Project Type: Non-Capacity (Annual) Project Manager. Scott Nutter Description: This project inGudes procuring and instaliing traffic,signal equipment uprades for exisfing signals as well as safety/capacity improvements for existing and/or new signals. The City uses accident and traffic count data to identify intersections in need if improvements: Progress Summary: Future Impact on Operating Budget Budget: 2010 vTO aou,ai so„ ,o eoaget Budget Expenditures Budget Balance Adopted Budget Budget AmerMmeMs Adjusted Budget - - - - Activity: , (Previous 2 Yrs) 2010 YE 2011 Year End Total Project Funding Sourees: Prior M 2010 EsGmaEe 2011 Bud et 2012Budget Project Total Cost Unrestricted Cap.. lmprov. Revenue - - - ~ _ GrarRS (Fed,State,Local) REET 2 - 175,000 175,000 175,000 350,000 1,225,000 , Othei ` 7otal Funding Sources: - 175,000 175,000 175,000 350,000 1,225,000 Capital ExpendRures: Desrgn - 10,000 10,000 10,000 20,000 70,000 Right of Way - - - ConsGudion 165,000 165,000 165,000 330,000 1;155,000 - Total Expenditures: - 175,000 175,000 175,000 350,000 1,225,000 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 ' Funding Sources: Unrestricted Cap. Improv. Revenue - - - - _ _ GraMS (Fed,SYate,Locaf) - - - _ _ _ REET2 175,000 775,000 175,000 175,000 1,050,000 - Other Total Funding Sourees: 175,000 175,000 175,000 175,000 1,050,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 - RigM of Way - - - - _ _ Construction 165,000 165,000 165,000 165,000 990,000 Total Expenditures: 175,000 175,000 175,000 175,000 1,050,000 - Grants / Other Sources 44 Traffic Signal & Intelligent Transportation Systems Improvement Projects City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Speciai Revenue Fund Project Title: ITS Dynamic Message Signs TIP # 50 Project No: Cp7aXx . Project Type; NOn-Capacity (ITS) Project Manager. TBD Description: . This project will fund the design and construction of Dynamic Message signs at various locations throughout the city. Dynamic message signs are an important tool in ITS for informing roadway users. Priority locations for sign installations are based on the Comprehensive Transportation Plans ITS map and include Aubum Way N, Aubum Way S, W Valley Highway, E Valley Highway and Lea Hill Rd. Progress Surnmary: The first phase of this project is scheduled to begin in 2014 or sooner if grant funding becomes available. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5000. Budget: 2010 rm aacuai 2011 10 sua9ec Budget Ecpenditures Budget Balance Adopted Budgef - - - , - 8udget Amendmerrts - - - Adjusted Budget - - - - Activity: ' 2010 YE 2011 Year End Total ProjecY. ' Funding Sources: Prior to 2010 Estlmate 2011 Budget 2012 Budget Proed Total Cost Urnes6ided Sheet Revenue - - - - - 180,000 Grants (Fed.State.local) - - - - , - 1,140,000 REET - - - - - - PWTFL - - - - - ' Other - - Total Funding Sources: - - - - - 1.320,000 Capital Ezpendiluresc Design - - - - - 120,000 Right of Way - - - - - - ConsVuction 1,200 000 Total ExpendiWres: 1,320.000 Forecasted Project Cost: : Total Expenditures 2013 2014 2015 2016 2011 -2016 Be ond2016 , Funding Sources: Unrestrided Sbeet Revenue - 30,000 - 30,000 60,000 120,000 Grants (Fed,SYate,LoCal) - 190,000 - 190,000 380,000 760,000 REET - - - - - PWTFL - - - - - - Other Total Funding Sourees: • 220,000 - 220,000 440,000 880,000 Capital Eupendituras: Design - 20,000 - 20,000 40,000 80,000 Right ol Way - - - - - - ' Construction 200,000 200,000 400,000 . 800,000 Total Expend'rtures: - 220,000 - 220,000 440,000 880,000 Grants / Other Sources: Grant funding is unsewFed: Traffic Signal & Intelligent Transportation Systems Improvement Projects 45 I City ofAuburn Transportation Improvement Program ` ARTERIAL STREET FUND (102) Capital Faciiities P1an Si_x Year Cap_i_tal_Facitifies Plan; 2011-2016 . Special Reqenue Fund ' Project Titie: East Valiey Highway ITS Expansion TIP # 51 Project No: Cplooa Projed Type: Capacity ~ . Project Manager. TBD LOS Corridor ID# 10 DescripUon: - This projeot will fund the design, coordination, permitting and consWction of ITS faalities from 41st St SE to Lake Tapps Parkway. Progress Summary: i Future Impact6n Operating Budget The annual tnaintenance cost for this projed is esUmated to be $5000. Budget: 2010 _ ttD aetual 2011 10 Budget Budget Expenditures Budget Balanee Adopted Budget Budget AmendmehLs Ad%usted Budget AGtivity: 2010 YE 2011 Year Erid Toql Projed Funding Sourees: Prior to 2010 Estimabe 2011 Bud et 2012Bud Budget Project Total Cost Unrestrided Streef Revenue - Gradts (Fed.SYete.Loca/) - - - - - 692.000 REET Traffic Impad Fees 108,000 Other Total Funding Sources: - - - - 800,000 Capital Expenditures: Desi9n - - - - - 85,000 , Right of Way Construction - 715,000 Total Expendkures:. - - - - 800,000 Forecasted Project Cost: Total Ficpenditures 2013 2014 2015 2016 2011.e2016 Beyond 2016 Funding Sources: Unrestricted Street Revenue - - Grarrts (Fed.State.locaq - 692,000 - - 692,000 - REET - - - - - - Trafic lmpad Fees - 108,000 - 108,000 - Other Total Funding Saurees: - 800.000 - 800,000 - Capitaf EzpendiWres: Design - 85,000 - - 85.000 - RigM of WaY - - - - - _ Construction - 715,000 715,000 Total Expandkures: - 800,000 - - 800,000 - Granis / Other Sources: GraM tunding is unsecured. 46 Traffic Signal & Intelligent Transportation Systems Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016. Special Revenuefund ProjectTitle: Aubum Way South Corridor Improvements Phase 1 TIP # 2 Project No: CplOOOc Project Type: Non-Motorized Project Manager. TBD LOS Corridor ID# 4 Description: This project will construd pedestrian improvements aiong Aubum Way South between Dogwood St SE and Fir St SE that are consistent with WSDOTs SR-164 Route Development Plan. This projed includes sidewalk improvements, access managemeM, a mid-block pedesfian crossing, construction of a u-tum wedge at Fir St SE and street lighting. Progress Summary: Future ImPact on Operating Budget: This project will tiave no impact on the operating budget for street maintenanoe. Budget: 2010 vrDaewai 2011 10 suaget Budget Expenditures Budget Balance AdoptedBudget - - - - Budget Amendments Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prfor to 2010 Estimabe 2011 Budget 2012 Budget Project Total Cost. UnresVided Street Revenue - - 40,000 60,000 40,000 100,000 Grants (Fed,State,Locaq - - 120,000 620,800 120,000 740,800 TrafFic fmpact Fees - - - - - - REE72 - - - - - - Other Sources Total Funding Sourees: - - 160,000 680,800 160,000 840,800 Capital EzpendiWres: Design - - ~ 157,000 6,000 157,000 163,000 Right ol Way - - 3,000 - 3,000 . 3,000 Construction 674,800 674,800 Total Ezpenditures: - - 160,000 680,800 160,000 ' 840,800 Forecasted Project Cost: ToYal Expenditures 2013 2014 2015 2016 2011-2016 Be nd2016 Funding Sources: Unresdicted Sheet Revenue - - - - 100,000 - Grdnts (Fed,SYate.LocaQ - - - - 740,800 - Traffic Impact Fees - - - - - - REET'2 - - - - - - Other Souroes . Total Funding Sourees: ~ - - - - 840,800 - Capital Expenditures: Design - , - - - 163,000 - , RightofWay 3,000 - Construetion 674,800 Total Expenditures: - - - - 840,800 - _ GraMs / Other Sources: Federal grant funding is unsecured, but applications have been submitted. Other sources are city funds to be Non-Motorized & Transit Improvement Projects 47 ' City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facit'ities Plan, 2011-2016 _ Special Revenue Fund Project Titie: Skinner Road to 3rd Ave (Auburn Pacfic Trail Phase 2) TIP # 22. Project No: c507B0 Project Type: Class 1 Trail f Sidewalk (Capacity) Projed Manager. Leah Dunsdon Desaription: This projed will oonstrud minor road widening and bicyde lane striping on Skinner Road and 3rd Aye SE from Ellingson Rd SW to Pacific Park. Sidewalks will be constructed along the westem side of Skinner Road where there are gaps in the sidewalk network. The project length is approximately 12 miles. The project will connect to the Phase 1 improvements constructed in Aubum in 2007. Progress Summary: Phase 1(portion in Aubum) was constructed'in 2007. Phase 2(portion in Pacific) will be constructed in 2010. Future Impact on Operating Budget This project will have no impact on the operating budget for street maintenance. . Budget: 2010 rro naual 2011 10 Budget Budget Expendihues Budget Balanee Adopted Budget - - - - Budget AmendmerKs Adjusted Budget - - - Activity: ~ 2010 YE 2011 Year End Total Project Funding Sourees: Prior to 2010 Estimate 2011 Budget 2012 Budget Projeet Total Cost Unrestrided Sheet Revenue 3,300 3,600 1,000 - 7,900 7,900 ~ 1Grants (Fed,State,Local) 9,557 101,500 - - 111,057 111,057 REET2 7,920 - - - 7,920 7,920 Tiaffic Impad Fees - - - - _ Other (Ciry of Pacifrc) - 36,200 36,200 36,200 Total Funding Sources: 20,777 141,300 1,000 - 163,077 163,077 Capital Expenditures: Design 20,777 10,000 - - 30,777 30,777 Right o/ Way - - - - - _ ConshucUOn - 131,300 1,000 132300 132;300 Total Expertdkures: 20,777 141,300 1,000 - 163,077 165,077 Forecasted Project Costc Total Expendltures 2013 2014 2015 2016 2011-2016 Beyond 2018 Funding Sourees: Unresbrded Sbeet Revenue - - - - 1,000 - Grants (Fed.State.Local) - - - - - - REETZ - - - - - - Tiaffic Impact Fees - - - - - - Other (City of Pacihc) Total Funding Sourees: 1,000 _ i , Capital Expendkures: Desi9n - - - - - - ' Right of WaY - - Cortstrudion - - 1,000 ' . Total Expendkures: - - - - 1,000 . Grants / Other Sources: Other is a reimbursable commitment of funds from City ofPacific: . 48 Non-Motorized & Transit Improvement Projects City ofAuburn Transportation Improvement Program ' ARTERIAL STREET FUPID (102) caPital Facilwes Plan Six Year Capital Facilities Plan, 2011-2016 8peaal Revenue Fund ProjectTiUe: BNSF/E. Valley Highway Pedestrian Underpass TIP # 23 Project No: c229a0 Project Type: Class 1 Trail (Capacity) Project Manager. TBD. _ Deswiption: Project to construct an undercrossing of the BNSF Railroad in conjunction with a pedesVian bridge to allow a safe, direct, attractive non-motorized access'between neighborhoods in the City of Pacific and schools in the City of Aubum. . Pmgress Summary: The design is, on hold. Funding source is most Iikely a federal earmark. CuRently this project is on hold pending some discussions with BNSF RR. They are in the process of planning for a third rail which would significantly impact the design. Future Impact on Operetlng Budget: Ttie annual maintenance cost for this project is estimated to be $240. Budget 2010 YTD Aetual 2011 70 Budget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmerns - - - Adjusted Budget - - - - 14CtiVity: 2010 YE 2071 Yesi End TotalProject Funding Sourcas: Prfor to 2010 EstimaEe 2011 Bud at 2012 Budget Pro ect Total Cost ' UnresUicted SYreet Revenue 53,900 - - - 53.900 53,900 GraMS (Fed,State,Local) 170.400 - - - 170.400 9.720,400 REE7 - Traffic Impect Fees - OtAer 250.000 Total Funding Sourees: 226,300 - - - 224.300 10,024,300 Capihal Expenditures: Design 724,300 - - - 224,300 974,300 Right of Way - - - - - 50,000 ConsWCBon 9,000,000 Totai ExpendKures: 224,300 - - - 224,300 10,024,300 Forecasted Project.Cost: Total , Ezpandltwes 2013 2014 2015 2016 2011-2016. B nd 2018 Funding Sources: , Unrestricted 57reet Revenue - - - - - - . GraMS (Fed,State,Loca/J 4.550,000 - 4,550,000 5.000,000 . REET - - - - - - Traflic /mpact Fees - - - - - aner(orr,er ayer,cres)• 250,000 250,000 Total Funding Sources: - - - 4,800,000 4,800,000 51000,000 Capital Expenditures: Design - - - 750.000 750.000 ~ - RigM of Way - - - 50.000 50,000 _ Cpnshuc8on 4,000 000 4,000,000 5 000 000 Total Ezpenditures: - - - 4,800,000 4,800,000 5,0001000 Grarrts ! Other Soutces: 'KC Open Space Bond and High Spaed Rail Safety Money: Non-Motorized & Transit Improvement Projects 49 City ofAuburn Transportation Improvement Progrdm ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011 2016 Special Revenue Fund ' Project TiUe: Academy Drive Multi-Use Trail TIP # 24_ P~ojed No: Cpxoooc Project Type: Class 1 Trail (Capacity) Project Manager. TBD Description: , This project will use existing right-of way to repair the damaged roadbed to a usable multi-use trail on Academy Dr from the Greeri River Rd to Aubum Way S. Progress Summary: _ Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,680. Budget: 2010 YTD Actual 2011 10 Budget Budget Ezpenditures Budget Balanee . Adopfed Budget Budget Amendmenrts ' Adjusted Bud9et - - - - ACtIVIty: ' . . . 2010 YE 2011 Year End Total Project Pundi_ng Sourcea: Prior to 2010 Estimabe 2011 Budget 2012 Budget Project Total Cost UnresUided Street Revenue - - - - - 245;000 Grams (Fed,State.Loca!) - - - - - 765;000 REET ' rralfic Impact Fees - - - - - - Orirer Soumes Total Funding Sourcea: - - - - 1,010;000 Capital Expenditures: Design, - - - - - 160,000 Right of WaY - - - - - - ConstrucGon 850,000 Total Ezpendkures: - - • - . 1,010;000 Forecasted Project Cost: Total Fxpendltures 2013 2014 2015 2016 2011-2016 Beyond 2016 • Funding Sources: Unrestrided Street Revenue 10,000 150,000 42,500 42,500 245,000 - Grartts (Fed,State,Locan - - 382,500 382,500 765,000 REET - - - - - - Traffic tmped Fees Other Sources Total Funding Sources: 10,000 150,000 425,000 425,000 1,010,000 - ~ • Capital ExpendRures: Design 10,000 150.000 - - 160,000 _ RigM ol WaY - - - - - - Conshuction 425,000 425,000 850,000 Total Expenditures: 10,000 150,000 425,000 425,000 1,010,000 - Grants / Other Sources: Grant Funding is unsecured. 50 Non-Motorized & Transit Improvement Projects Ciry of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital FaciliGes Plan, 2011-2016 Special Revenue Fund Project Title: METRO Shuttle: Auburn Community and Lakeland Shuttles TIP # 26 Projed No: NA Project Type: Other Project Manager. TBD Description: , . Operation oosts associated with two new Metro routes: a Commuter Shuttle from the Lakeland Hills neighborfiood to Aubum Station and a Community Shuttle linking 2sidential neighborfioods with commercial and service centers. Progress Summary: Lakeland Hill Service began in 2009. The community shuttle will begin senrice in 2010. Funding assistance will be requested through the Transit Now Partnership Program. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 YTD Adual 2011 10 Budget Budget ExpendiWres Budget Balance Adopted Budget - - - - Budget AmendmerRs - - Adjusted 8udget - - - - Activity: (Previous Yrs) 2010 YE 2011 Year End Total Projeet Funding $ources: Prior to 2010 Estimate 2011 Budget 2012Bud et Proiect Total_ _ __Cost Unreshicted Street Revenue 100,628 200,000 220,000 220,000 520,628 1,620,628 Grants (Fed,State,Local) - - - - - - REET - - - - - - Other (TBD) - - - ToWI Funding Sourees: 100,628 200,000 220,000 220,000 520,628 1,620,6Z8 Capital Expenditures: Design - - - - - - - Right of Way - - - - - - OperaNng Costs 100,628 200,000 220,000 220,000 520.628 1,620,628 Total Expendltures: 100,628 200,000 220,000 220,000 520,628 - 1;620,628 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2076 Beyond 2016 Funding Sources: UnresUicted Stieet Revenue 220,000 220,000 220,000 220,000 1,320,000 - Granfs (Fed.State,LocaQ - - - - - - REET - - - - - - Other (TBD) - - Total Funding Sourees: 220,000 220,000 220,000 220,000 1,320,000 - Capital Ezpenditures: Design - - - - - - Right of Way - - - - - - OperatingCosts 220,000 220,000 220,000 220,000 1,320,000 - Total Ezpenditures: 220,000 220,000 220,000 220,000 1;320,000 - GraMs / Ocher Sources: Non-Motorized & Transit Improvement Projects 51 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan: Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Tdle: Citywide Pedestrian Crossing Program TIP # 30 Project No: CplDOOc Project 7ype: Non-Capacity (Bi Annual) . Project Manager. Pablo Para Description: Tfiis is a bi-annual level of effort project used to fund small pedestrian safety studies and improvement projects. This project provides for pedestrian safety studies and improvements at various IocaUons atywide. Projects are prioritized annually based on safety issues and pedestrian demands. Progress Summary: Projeds for2010 are 3rd St NE & Aubum Ave Intersection improvements and 15th St SW Interurban Trail X-ing Improvements. Future Impaet on Operating Budget: • This project will have no impact on the operating budgeYfor street maintenance. Budget: 2010 YTD Aecual 2011 10 BuHget Budget Ezpenditures Budget Balanee Adopted Budget - - - - Budget Amendments Adjusted 8udget ' - - - - Activity: - - • 2010 YE 2011 Year End Total Project Funding Sourees: Prior to 2010 EsUmate 2011 Budget 2012 Budget Project Total Cost Unrestrrcted Sheet Revenue - 100,000 - 100,000 100,000 400,000 Giants (Fed.State.Local) - - - - - - REET - - - - - - Trafficimpad Fees Other Total Funding Sources: - 100,000 - 100,000 100,000 400,000 CapiWl Expenditures: Design - 10,000 - 70,000 70,000 40;000 Right of WaY - - - - - - ConsVUCtion - 90,000 90,000 90,000 _ 360,000 Total Expenditures: • 100,000 - 100,000 100,000 400,000 ' Forecasted Project Cost: Total Ezpenditures 2013 2014 2015 2016 2011-2076 Beyond 2016 Funding Soureas: Unrestrrcted Street Revenue - 100,000 - 100,000 300,000 - Grant§ (Fed,State,Locaf) REEf - - - - - - Traffic /mpad Fees Other TotalFunding'Sourees: - 100,000 - 100,000 300,000 - Capital ExpendiWres: Design - 10,000 - 10,000 30,000 - , Right of WaY - - - - - - Conshuction 90,000 90,000 270,000 Total Expenditiires: - 100,000 - 100,000 300,000 - Grarrts / Other Sources: 52 Non-Motorized & Transit Improvement Projects City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: Citywide Arterial Bicycle 8 Safety Improvements TIP # 31 Projed No: CplooE7t Project Type: Non-Capacity (Safety) Project Manager: Various Description: This is an annual level of effort projed focused on funding bicyGe and safety improvements on Gassified roadways. Projects are prioritized annually based upon field stutlies. Project was previously called "Citywide Roadway Safety Infrastructure Improvements. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget 2010 trt'o acq,al 2011 10 Budget Budget Expenditures Budget ' Balanee . Adopted Budget - - - - Budget Amendmenfs - Adjusted 8udget - - - - Activity: 2010 YE 2011 Year End Total Project Funding Sourees: Prior W 2010 Estimate 2011 Budge! 2012 Budget ProJect Total Cost Unrestrided Sdeet Revenue 19,300 - 100;000 100,000 179,300 619,300 Grants (Fed,SYate,loca!) - - - - - - REET Tratfic Impad Fees - - - - - - Other Total Funding Sources: 19,300 - 100,000 100,000 118,300 619,300 Capital Expenditures: ' Design 19,300 - 10,000 10,000 29,300 79,300 Righf of Way - - - - - - ' Construc6on 90.000 90,000 90,000 540,000 Total bcpenditures: 79,300 - 100,000 100,000 119,300 619,300 Forecasted Project Cost: Totat EzpendRiires " . . 2013 2014 2015 2016 2011-2016 Beyoed 2016 Funding Sources: UnresUicted Sbeet Revenue 100,000 100,000 100.000 100,000 600,000 - Grants (Fed,State.Locaq - - - - - REET - - - - - Tratric Impad Fees ' - - - - - - Other - Total Funding Sourees: 100,000 100,000 100,000 100,000 600,000 - Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 - Right of Way - - - - - - Consttiction 90,000 90,000 90,000 90,000 540,000 Total Ecpenditures: 100,000 100,000 100,000 100,000 600,000 - GraMs / Other Sources: Non-Motorized & Transit Improyement Projects . 53 City ofAuburn Transportation ImprovementProgram , CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Capital Projects Fund Project Titie: Citywide Sidewalk Improvements TIP #32 Project No: vafies Project Type: Non-Capacity (Mnual) Projea Manager: Seth Wickstrom Descriptionc Projed will fund sidewalk improvements to a variety of locations throughout the city. A sidewalk irnentory was completed in 2004. Annual projects are selected based upon criteria such as: gap closure, safe walking routes to schools; completion of downtown pedestrian corridor or "tinkage", connecti4ity to transR services, ADA requirements, and "Save our Streets" (SOS) project locations. Progress Summary: Future Impact on Operating Budget: Budg@t: 2010 YTD Aetual ' 2011 10 Budget Budget Ezpenditures Budget Balanee • Adopfed Budget - - - - Budgat Amendmerrts Adjusted Budget - - - - ' ACtlvity: (Previous Yrs) 2010 YE 2011 Year ErM Total ProjeG Funding Sources: Pdor to 2010 EsUmate 2011 Budget 2012 Bud et Pro eet Total Cost _ Unreshicted Cap. Improv. Revenue 71,700 154,400 180,000 20,000 40¢,500 825;500 Grams (Fed.State.Local) - - - - - - REET2 - - - - - - Other Total Funding Sources: 71,100 154,400 180,000 20,000 • 405,500 825,500 Capital Expenditures: Design - - 10,000 2,000 10,000 ' 36,000 RigM of WaY - - - - - - ConsVudion 71,700- 154,000 170.000 18,000 395,100 789,100 . Total Expenditures: . 71.100 , 154.000 180.000 20,000 405,100 825.100 Forecasted Project Cost: _ ToWI ExpenditMres 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sources• Unreshicted Cep. fmprov. Revenue 180,000 20,000 180,000 20,000 600,000 - Grants (Fed.State.Locel) - - - - - - REET 2 . - - - - - Other Total Funding Sourees: 180,000 20,000 180,000 20,000 600,000 - Capital Ezpenditures: Design 10,000 2,000 10,000 2,000 36,000 - Right of WaY _ - - - - - - Constniction 170,000 18,000 170,000 78,000 564,000 Total Ezpenditures: 180,000 20,000 180,000 20,000 600,000 - Grarrts / Other Sources: 54 Non-Motorized & Transit Improvement Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Tiue: A Street NE Pedestrian Improvements TIP # 44 Project No: cpxtxc Project Type: Sidewalk Improvements (Non-Capacity) Project Manager. TBD Description: This project completes a pedestrian connection between Downtovm Aubum and the 8th St NE business disfict. This project will improve a pedestrian crossing at 3rd St NE, and construd sidewalks/access ramps along the.A St NE corridor. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this projed is estimated to tie $500. Budget: 2010 rro neeuai 2011 10 sudget Budget Ezpenditures Budget Balance Adopted Budget - - - Budget Amendmems - - - - Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sourees: Prior to 2010 Estimabe 2011 Bud et 2012 Bud et Projed Tofal Cost Unrestricted Sheet Revenue - - - - - - Grents (Fed,SYate.Locan - - - - - 750,000 . REET - PWTFL - - - - - - . Other 7otal Funding Sources: - • - - - 150,000 Capital EzpendiWres: Design - - - - - 15,000 Right of Way - - - - - - Construction 135,000 _ Total ExpendiWres: - - - - - 150,000 Forecasted Project Cost: Total Ezpenditures 2013 2014 2015 2016 2011•2016 Beyond 2016 Funding Sources: . Unresiricted Street Revenue - - - - - - Grants (Fed,SYate,Locan 150,000 - - - 150,000 - REET - - - - - - PWTFL - - - - - - Other Total Funding Sources: 150,000 - - • 750,000 - Capital Expenditures: Design 15,000 - - - 15,000 - ' Righf ofWay - - - - - ' Conshuction 135,000 135.000 Total Ezpenditures: 150,000 - - - 150,000 - GraMs / Other Sources: Grant iunding rs unsecured: Non-Motorized & Transit Improvement Projects 55 , City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan ' Six Year Capital Facilities Plan, 2011-2016 Special Revenue:Fund Project Title: Interurban Trailhead Improvements TIP # 45 Project No: Cplooo( Projea Type.: Class 1 Trail (Non-Capacity) Project Manager. TBD Description: , This project provides funding for enhancemeMs to existing trailheads and construction of new Vailheads. Improvements include bike radcs, kiosks, parking and access. Progress Summary: - Futqre Impact on Operating Budget This project will haye no impact on the operating budget for street maintenance. Buaget: 2010 r,v nctual 2011 iD Budget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget AmendmerKs Adjusted Budget - - - - Activity: 2010 YE 2011 YearEnd Total Projeet • Funding Sources: Prior to 2010 Esdma6e 2011 Bud t 2012 Bu eY Project Total Cost Unres6icted Sbeef Revenue - - - - - Grarrts (Fed.State.Local) - - - - - 185,000 Tralfic Mitigafron Fees - - - - - 25,000 • PWTFL - - - - - - Other Total Funding Sources: - • . - - 210,000 Capital Expenditures: Desi9n • - - - - - 20,000 RigM of Way , - . - - _ _ Construcfion - - 190,000 Totat Expenditures: - • - - - 210,000 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sourees: Unreshrded Street Revenue - - crerns (r-ied,srare.Locaq - 185,000 - - 185,000 _ ' TialFie Mitigation Fees - 25,000 - - 25,000 - PWTFL - - - - - - Other Total Funding Sources: - 210,000 - - 210,000 - Capital Expenditures: Design - 20.000 - - 20,000 - Right of WaY - - - - - - Conshudion - 190.000 190,000 7otal EzpendiWres: - 210.000 - - 210,000 _ Grants / Other Sources: Grarrt funding is unsecured: 56 Non-Motorized & Transit Improvement Projects City of Auburn Transportation Improvement Program - ARTERIAL STREET fUND (102) Capital Facilities Plan SixYear Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 37th Street SE 8 R Street SE Pedestrian Connector TIP # 53 . Project No: cp0803 Project Type: Ciass 1 Trail (Capacity) Project Manager. Leah Dunsdon Description• This project wilf construct a pedestrian connection between 37th ST SE & R St providing a link between south Aubum and the White River Trail and Game Farrn Park. Prog'eess Summary: Future Impact on Opereting Budget: This project will have no impact on the operating budget for street maintenance. BUd9et; 2010 YTD Actual 2011 10 Budget ' Budget Expenditures Budget Balance Adopted 8udget - - - - Budget Amendments - - Adjusted &idget - - - - Activity: 2010 YE 2011 Year End Total Project Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Project Total Cost . UnresGicted Sheet Revenue - - 1,000 - 1,000 1,000 _ Grarrts (State) 21,327 102,973 - - 124,300 724,300 Traffic MitigationFees - - - - - - PWTFL - - - - - - Other - Total Funding Sourees: 21,327 102,973 1,000 - 125,300 125,300 Capital Ezpenditures: Design 21,327 15,000 - 36,327 36,327 Right of Way - - - - - - Constructlon 87,973 1,000 88,973 88,973 Total Eupenditures: 21,327 102,973 1,000 - 725,300 125,300 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 . Funding Sources: . . UnresMctedStreetRevenue - - ~ - - 1,000 - Grants (State) - - - - - - Tra/fic Mitigation Fees - - - - - - PWTFL - - - - - Other Tofal Funding Sources: - - - 1,000 - Capital Ezpenditures: - Design - - - - - RigM of Way - - - - - Construcfion 1,000 - Total Expenditures: - - - - 1,000 - GrantsJ Other Sources: Grant funding is State Ped & Bike $afety Grant. Non-Motorized & Transit Improvement Projects 57 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital_Facilities Plan, 2011-2016 Speciaf Revenue Fund ProjecrTide: Lea Hill Pedestrian Improvements TIP # 56 Project Na CpXXXX Project:Type: Non-Motorized Project Manager. TBD LOS Corridor ID# 19 Description: This project will construct pedestrian improvements along the south side of SE 312th St east of the intersection with 124th Ave SE, intersection improvements at 116th Ave SE & SE 304th St, painf bike lanes on 116th Ave SE between SE 312th St and SE 304th St and improve curb rampsadjacent to Rainier Ridge Middle School. ProgPess Summary: ~ Future lmpact on Operating Budget: This project u4ill have no impact on the operating budget for street maintenance. Budget: 2010 YTD Adual 2011 10 Budget Budget Expenditures Budget Balance Adopted BudgeY., - - - - Budgef AmendmeMs . Adjusted Budget - - - - ACtIVIty: ~ . . (Previous Yrs) 2010 YE 2011 Year End Total Project Punding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Project Total Cost Unrestrided Street Revenue - - - - - _ Grants (Fed,State,LocaQ - - 57,080 296,820 57,080 353,900 Tratfrc Impact Fees - - - - - _ REET2 - - - - ~ - . _ Other Total Funding Sources: - - 57,080 296,820 57,080 353,900 Capital Expenditures: Design - - 57,080 - 57,080 57,080 RigM of INay - - - - Consduction 296,820 296,820 7otal Ezpenditures: - - 57,080 296,820 57,080 353,900 Forecasted Project Cost: i Total Expendi~res 2013 2014 2015 2016 2011-2076 Be ond 2016 Funding Sources: Unres6ided Shaet Revenue _ GranRS (Fed.S[ate.LocaQ 353,900 _ Tia/fic /mpad Fess REET2 - - - - - - Other ToWI Funding Sources: - • - - 353,900 - Capital Ezpenditures: Desi9n - - - - 57,080 - Righf of Way Conshuction - 296,820 Total.Ezpenelitures: 353,900 . GrantslAther.Sources: Grant funding is unsecured. 58 Non-Motorized & Transit Improvement Projects Ciry ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 3011-2016 Special Revenue Fund Project T'rUe: 41 st Street SE and A Sfreet SE Access Management Study TIP # 27 Project No: cpxoooc - Project Type: Safety (Non-Capacity) Project Manager. TBD LOS Corridor ID# 10,33 Description: Study the area from 37th St SE to the White River on A St SE including 41st St SE from D St SE to C St SE. The study should review the safety and access needs of the traveling public and the adjacent properties. Progress Summary: Pre-design will be done to refine project scope, alignment, and cost. Future Impad on Operating Budget This study will have no impact on the aperaUng budget forstreet maintenance. Budget: 2010 rTn aotuai 2011 10 sua9ec Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - Adjusted Budget - - - - ActiVity: 2010 YE 2011 Year End Total ProJeet Funding Sources: Prior to 2010 Estimate . 2011 Bud et 2012 Budget Projeet ToffiI Cost Unreshided Street Revenue - - 10,000 - 10,000 10,000 , Grants (Fed,S[ate.Loca4 - - - - - - REET - - - - - - Trafhc M'tbgation Fees - - - - - - Other TotalFunding Sourees: - - 10,000 - 10,000 10,000 Capital Expenditures: - Design - - 10,000 - 10,000 10,000 Right of Way - - - - - - Construction • Total EzpendiWres: - - 10,000 - 10,000 10,000 Forecasted Project Cost: Total Expenaltures 2013 2014 2015 2016 2011-2016 Be ond 2016 Funding Sources: " Un2sVicted Street Revenue - - - - 10,000 - GrdMS (Fed,State.Locan - - - - - - REET - - - - - - Traffic Impad Fees - - - - - - Other Total Funding Sources: - - - - 10,000 - Capital EzpendiWres: Design - - - - 10,000 - Right of Way - - - - - - Construction ToWI Ezpenditures: - - • - 10,000 - Grants / Other Sources: Preliminary Engineering and Miscellaneous Projects 59 1 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: South 277th - Wetland Mitigation TIP # 29 Project No: c410a0 Project Type: Non-Capacity Projeat Manager. Leah Dunsdon Description: ~ Wetland mitigation for the 277th St Grade Separation project. Progress $ummary: This is a 10-year obligation, which began in 2004. Future Impaet on Operating Budget This project will have no impact on the operating 6udget for street maintenance. Budget: 2010 vTo aauai zo„ ,o euager - Budget Expenditures Budget Balanee Adopted 8udget ' - - - - Budget AmendmeMs Adjusted 8udget - - - - Activity: 2010 YE • 2011 Year End Total Projeet Funding Sources: Prior to 2010 Esfimate 2011 Budget 2012 Budget ProeG Total CosE _ Unrestricted.Sdeet Revenue 90,140 113,500 25,000 25,000 228;640 278,640 GraMs (Fed.S7ate,LOCa!) - - - - - - REET - - - - - - Tralfic fmpacf Fees. ' Other Total Funding Sourees: 90,140 113,500 25,000 25,000 228,640 278,640 Capital Expenditures: . Design 57,394 95,000 15,000 15,000 167,394 197,394 RigM of Way - - - - _ _ Conshuction 32,746 18,500 10,000 10,000 61,246 81,246 Total Expenditures: 90,140 113,500 25,000 25,000 228;840 278,640 Forecasted Project Cost: Total F~cpenditures ' 2013 2014 2015 2016 2011-2016 Beyond2016 Funding Sourees: Unres6icted S6eet Revenue 25,000 - - - 75,000 - GrarRs (Fed.State.Loca1) - - - - - - REET - - - - - - TratFic Impad Fees Otber Total Funding Sources: 25,000 - - 75,000 - Capital Ezpenditures: Design 15,000 - - - 45,000 - Right of Way - _ _ Cons6uction 10,000 30,000 Total ExpendiWres: 25,000 - - - 75,000 - Grants / Other Sources: 60 Preliminary Engineering and Miscellaneous Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Title: 104th..Ave SE & Green River Road Study TIP # 46 Project No: Cp7oooc Project Type: Non-Capacity (Intersection Safety) Project nnanager: Seth Wickstrom LOS Corridor ID# 24 Description• This project will fund a pre-design study to determine the right of way, environmental and wnstruction requirements for intersection " safety improvements. This safety project scope will indude sigh4 distance improvements, constructing tum lanes, channelization, ' environmental mitigetion, signage and clear.zone improvements. Progress Summary: Future Impact on Operating Budget: This project wiil have no impact on the operating budget for street maintenance. Budget 2010 vm neeuai 2011 -110 eud9et BudgeY Ezpenditures Budget Balanee Adopted Budget - - - - Budget Amendmerrts - - Adjusted Budget - - - - • Activity: 2010 YE 2011 Year End Totai Projeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Proeet Total Cost Unrestricted Street Revenue - 2,000 3,000 - 5,000 5,000 Grants (Fed,State,Local) - - - - - - REET - - - - - - PWTFL - - - - - - Other Total Funding Sourees: - 2,000 3,000 - 5,000 5,000 Capital Expenditures: Design - 2,000 3,000 - 5,000 5,000 RigM of Way - - - - - - Consduction Total Fxpenditures: - 2,000 3,000 - 5,000 • 5,000 Forecasted Project Cost: ' Total Expenditures 2013 2014 2015 . 2016 2011-2016 Beyond 2016 Funding Sourees: Unrestrtcted Street Revenue - - - - 3,000 - Grarrts (Fed.State,Local) - - - - - - REET - - - - - - PWTFL - - - - Other ToWI Funding Sourees: - - • - 3,000 Capital Ezpenditures: Design - - - - 3.000 - Right of Way - - - - Construcfion Total Expenditures: - - - - 3,000 - Grants / Other Sources: Preliminary Engineering and Miscellaneous Projects 61 ~ City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Eacilities Plan Six Year Capital_ Faalfies Plan, 20_11-2016 Special Revenue Fund Project Titie: Environmental Park Roadway Improvements Sfudy TIP # 47 Project No: . Cpxcioc Project Type: Capacity ' Rroject Manager. TBD Descriptionc This project will fund a study to detertnine the feasibility, scope and cost of low impact roadway, bicycle and pedestrian improvements in the Enyironmerrtal Park area. Included in this study scope is a wnnectiori between Clay St NW and Westem StNW. Progress $ummary: Future Impact on Operating Budget: This project will have no impad on the operating budget,for street maintenance. Budget: 2010 rro aceuai zo„ ,o suagec - ~ Budget Ezpenditures Budget Balance Adopted Budget Budgef Amendmertts - - - Adjusted Budget - - - - ' Activity: - , 2010 YE 2011 Year End Total Projeet Funding Sources: Prior to 2010 Estima6e 2011 Bud et 2012 Budget Pro'eG Total Cost Unres6ided SYreei Revenue - - 5,000 - 5,000 5,000 73rdnts(Fed;State,Loca!) - - - - - - REET - - - - - PWTFL - - - - - - ai,e. Total Funding Sourees: - - 5,000 - 5,000 5,000 Capiql Ezpenditures: Desfgn - - 5,000 - 5,000 5,000 Right of Way - - - - - Construction Total Expendkures: - - 51000 - 5.000 5.000 , Forecasted Project Cost: Total Ezpenaiaees 2013 2014 2015 2016 2011 - 2016 B`ond 2016 Punding Sources: - - - - Umes6icted SYreef Revenue - - - 5,000 - Grams (Fed.State.Locaq - - - - - - REET PWTFL - - - - - - Other Total Funding Sources: - - - - 5,000 - Capital Expenditures: Design - - - - 5,000 - RigM of Way - - - - - Consbucfion Total Expenditures: - - - 51000 - Grants / Other Sources: , 62 Preliminary Engineering and Miscellaneous Projects Ciry ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011 2016 Special Revenue Fund Project Title: Downtown to Les Gove Non-Motorized Improvements Study TIP # 48 Project No: Cplooa Project Type: Bike Lanes, Sidewalks and Transit Improvement Study (Capacity) Project Manager: TBD Description: This project provides funding to complete a studyof the 2nd StSE & F St SE corridor between Les Gove Park and Downtown Aubum. . ' Improvements may include pavement reconstruction, sidewalks, access ramps, signal modifications and route signing. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 rTnneeuai 2011 10 sudget Budget Expenditures Budget Balance Adopted Budget - - - - Budgef Amendments - - - Adjusted Budget - - - - Activity: 2010 YE. 2011 Year End Total Projed Funding Sourees: Prior to 2010 EstimaLe 2011 Budget 2012 Budget Project ToffiI Cost Unreshided Street Revenue - 2,000 8,000 - 10,000 10,000 Grants (Fed,State.LocaQ - - REET - - - - - - PWTFL - - - - - - Other Total Funding Sourees: - 2,000 8,000 - 10,000 10,000 , Capital Ezpenditures: Design - 2,000 8,000 - 10,000 10,000 RigM of Way - - - - - - ConshucGon Total Ezpenditures: - 2,000 8,000 - 10,000 10,000 Forecasted Project Cost: Total Expenditures 2013 2014 2015 2016 2011-2016 Beyond 2016 Funding Sources: UnresLided Stceef Revenue - - , - - 8,000 - Grants (Fed.SYate,LocaQ - - - - - - REET - - - - - - PYVTFL - - - - - - Other Totai Funding Sources: - - - - 8.000 - Capital Expenditures: . Design - - - - 8.000 - Right ol Way - - - - - - Construction - Total Ezpenditures: - - - - $,000 - Grants ! Other Souroes: Preliminary Engineering and Miscellaneous Projects 63 City ofAuburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2011 2016 Special Revenue Fund Project TiUe: S 316th Street Bicycle 8 Pedestrian Improvement Study TIP # 49 Project No: Cplooa Project Type: Class 2 Bike Lanes / Sidewalks (Capacity) Froject Ma.nagee TBD LOS Corridor ID# 37 Description: This project provides funding for completing a study to add bicycle and pedestrian facilities on S 316th St from east of Evergreen Heights Elementary to 51 st Ave S. Progress Summary: Future Impact on Operating Budget: - This project wili haye no impad on the operating budget for street maintenance. BudgBt: 2010 YTD Actual 2011 10 Budget Budget ExpendiWres Budget Balance Adopted Budget Budget Amendments Adjusted Budget - - - - AztIVIty: 2010 YE 2011 Year ErM Total Projeet Funding Sources: Prior to 2010 Estimate 2011 Bud et 2012Budget Projeet 7otal Cost Unres6idedSbeetRevenue - 1,000 4,000 - 5,000 5,000 Grents (Fed,Sfate.Loca/) - - - - - REET - - - - - - PYVTFL Other Total Funding Sources: - 1,000 4,000 - 5,000 5,000 Cap'rtal Expenditures: Design - 1,000 4,000 - 5,000 5,000 RigM of Way - - - _ _ _ ConstrucGon Total Ezpenditures: - 1,000 4,000 - 5,000 5,000 , Forecasted Projeet Cost: Total ExpendiWres 2013 2014 2015 2016 2011-2015 Be ond 2016 Funding Sources: Unrestricted Sheet Revenue - - - 4,000 - GranRs (Fed,SYate,Local) _ _ REET - - - - - - PWTFL - - - - - Otlier " Total Funding Sources: - - - - 4,000 = Capital Ezpenditures: Desi9n - - - - 4,000 - RigM ol WaY - - - - - - Construction Total Expenditures: • - - - 4,000 Grants ! Other Sources: 64 Preliminary Engineering and Miscellaneous Projects City.ofAuburn Transportation Improvement Program , ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan,:2011-2016 Special Revenue Fund Project Title: Kersey Way Study TIP # 54 Project No: Cpx)Oqc , `ProjectType: Capacity Project Manager. TBD LOS Corridor ID# 4 Description: ` • This project will study improvementsto the Kersey Way SE corridor from the White River Bridge to the southem city limits: The study will develop the scope and costs for horizontal/Vertical geometric roadway improVements, roadside hazaM mitigation, street lighting and non-motorized trail construation. 'fhe project length is approximately iwo miles: Progress Summary: Pre-design will begin in 2011 to refine budget and scope. Future Impact on Operating Budget: The annual maintenance cast for this project is estimated to be $14,056. Budget: 2010 rrDactuai 2011 10 Bud9ee Budget Expenditures Budget Balance ' Adopted BudgeP - - - - BudgetAmendments - - Adjusted Budget - - - - Activify: 2010 YE 2011 Year End Total Project Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Projed Total Cost UnresMc[ed Street Revenue - - - - - - GraMs (Fed,State,Local) , - - - - - - REET - - - - - - Traflic Impad Fees - 100,000 - 100,000 100,000 Other Total Funding Sources: - - 100,000 - 100,000 100,000. Capifal Expenditures: Design - - 100,000 - 100,000 100,000 Rigbt of Way - _ Conshuction Total Expenditures: - - 100,000 - 100,000 100,000. Forecasted Projed Cost: rocai ExPendtwres 2013 2014 2015 2016 2011-2016_ Be nd 2018 Funding Sources: - Unrestnc[ed StreetRevenue - - - - - , Grants (Fed.Stete,Local) REET - - - - - - - Traffic lmped Fees ' _ - - . - - 100.000 Other (Developer)' - - - Tofal Funding Sources: - - - - 700,000 - CapiWl ExpendiWres: , Design - - - - 100,000 - Right ol Way - - - - - - Construction ~ - Total Ezpenditures: - - - - 100,000 Grants / Other Sources: Preliminary Engineering and Miscellaneous Projects 65 _ City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital_Facilities Plan, 20_11-2016. Special Revenue Fund Project Tine: Mary Olson Farm Improvements TIP # 55 Project No: cp0815 Project Type: Non-Capacity Project Manager. Leah Dunsdon ' Descriptionr. ' This is a historical preservation projed required as mitigation for S 277th Reconstruction Project. Progress Summary: PFiase 1 of project was completed in 2009 and Phase 2 is scheduled to be completed in 2010. Future Impact on Operating Budget: This project will have no impact on !he operating budget for street maintenance. . BUdgCY:, 2010 YTD Actual 2011 10 Budget , Budget Expenditures Budget Balanee Adopted Budget Budget Amendments. - Adjusted Budget ACtiVity: 2010 YE 2011 Year End Total Projeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Projeet Total Cost Unrestrrcted Streef Revenue - - Grants (Federa!) 54.749 46,363 - - 101,112 101,112 REET - - - - _ PWTFL - - - - - - Other 25,973 10,000 1,002 36,973 36,973 Total Funding Sourees: 80,722 56,363 1,000 - 138.085 158,085 Capital Ecpenditures: Design 25,973 10,000 - - 35,973 35,973 Right of Way - - - _ _ _ Constntction 54;749 46,363 1,000 102,112 102,112 ' ToWI Expendftures: 60,722 56,363 1,O00 - 138,085 138,085 Forecasted Project Costc Total Expenditures 2013 2014 2015 2016 . 2071-2016 ' Be ond 2016 Funding Sources: Unres6icted SUeet Revenue _ Grants (Federal) - - - - - - , REET - - - - - PWTFL Other - 1.000 Total Funding Sources: - • - - 1,000 - Capital Expenditures: Desi9n Right of Way - - - - _ _ Construction - - - 1,000 Total Expenditures: , - - - - 1,000 _ Grants / OtherSources Federal grant is FHWA Mitigation Funds. Other Funds are 321 Municipal Parks funds, General Engineering iunds or Parks funds 66 Preliminary Engineering and Miscellaneous Projects City of Auburn Transportation Improvement Program ARTERIAL STREET FUND (102) Capital Facilities Plan , Six.Year Capital Facilities Plan, 2011-2016 Special Revenue Fund Project Taie: Annual Bridge Preservation Project TIP # 28. Project No: Various Project Type: Non-Capacityr (Annual) Project Manager. Seth Wickstrom Description: This is an annual level of effort projed used to fund bridge improvements as identified by the aty's annual bridge inspedion program. Progress Summary: Future lmpact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2010 YTD Actual 2011 10 Budget Budget Expenditures Budget Batance Adopted Budget Budget Amendments - - - Adjusted Budget - - - - Activity: 2010 YE 2011 Year End Total Projeet Funding Sou►ces: Prior to 2010 Estimate 2011 Budget 2012 Bud t Proed Total Cost Unreshrded SYreet Revenue - 50,000 50,000 50,000 10D,000 350,000 Grants (Fed,State,Local) - - - - - - REET - - - - - - Tralfic Mi0'gafion fees - - - - - - Obher Total Funding Sources: - 50,000 50,000 50,000 100,000 350,000 Capital Expenditures: ' Design - - - r - Right of Way - - - - - - ConstrocBon 50,000 50,000 50,000 100,000 350,000 TotalExpenditures: - 50,000 50,000 50,000 100,000 350,000 Forecasted Project Cost: Total Expendiwres 2013 2014 2015 2016 2011-2016 Be- nd.20'IB Funding Sources: Unres6icted Street Revenue 50,000 50,000 50,000 50,000 300,000 - Grants (Fed.SYafe.Locaq - - - - - - REET - - - - - - Traffic Mitigation Fees - - - - - - Other Total Funding Sources: 50,000 50,000 50,000 50,000 300,000 - Capital FxpendiWres: Design - - - - - - Right o1 Way - - - - - - Construction 50,000 50,000. _ 50,000 50,000 300,000 Totai Expenditures: 50,000 50,000 50,000 50,000 300,000 - Grards / Other Souraes: Roadway Preservation Projects 67 City ofAuburn Transportation Improvement Program STREET FUND (105) Capital Facilities Plan Six Year Capital Facilities Plan, 2011-2016 Special Revenue Funds Project Title: Mnual Arteriat Street Preservation Project No: cpxcxx TIP #35 Project.Type: Non-Capacity Pmject Manager. Seth WiCkstrOm Description: Implement regular payement maintenance and/or rehabilitation of various classfied streets citywide. These projects may include overlays, rebuilds, spot repairs, or a combination of these. It is arrtiapated that this program will be funded through bond proceeds that will be, repaid by the 1°/a utility tax that was adopted by Counal in 2008. Progress Summary: This program is being expanded from previous years. Prior years this program provided approximately $675,000 from the REET funding to go towards the purpose of p'eserving Gassified streets. • Future Impactbn Operating Budget: None i Budgetc 2010 rrD aen,al 2011 10 Budget Budget Expendltures Budget Balance Adopied Budget - - - - Budget Amendmerns Adjusted Budget Activity: (Preyious Yrs) 2010 YE 2011 Year End Totaf ProJeet Funding Sources: Prior toZ010 Estlmate 2011 Budget 2072 Bud et Pro eet Total Cost Unrestricted SYreet IFevenue - - - - - PropeRy Tax - - - - - - Uti!'rtyTax - 1,505;000 1,400,000 1,400,000 2,905,000 9,905,000 REET2 - - - - - - Bond Proceeds Total Funding Sourees: - 1,505,000 1,400,000 1,400,000 2,905,000 9,905,000 Capital Ezpenditures: Design - 85,000 50,000 50,000 135,000 385,000 RigM of Way - - - - _ _ Construction 1,420,000 1,350,000 1,350,000 2,770,000 9,520,000 Total Expenditures: - 1,505,000 1,400,000 1,400,000 2,905,000 9,905,0U0 Forecasted Project Cost: Total Expenditures 2013 2014 20`15 2016 2011 - 2016 Be ond 2016 Funding Sourees: Unreshicted Sheet Revenue _ _ ProPenY Tax - - - - - - Cltility Taz 1,400,000 7,400,000 1,400,000 1,400,000 8,400,000 - REET2 - - - - - - Bond Proceeds - - - - Total Funding Sources: 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 - Capital Expenditures: Design 50,000 50,000 50,000 50,000 300,000 - RigM of Way - - - - _ _ Constrvetion 1,350,000 1,350,000 1,350,000 1,350,000 8,100,000 Total Expendleiues: 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 - Grants / Other Sources: 68 Roadway Preservation Projects ~ ~ City ofAubum Trdnsportation Improvement Program STREET FUND (105) Capital Facilities Plan ~Six Year Capital Facilities Plan, 2011-2016 Special Revenue Funds Project Tide: Mnual Arterial Crack Seal Program Project No: cpxoooc TIP #36 Project Type: Non-CapaCity. Project Manager. Seth Wickstrom ' Descriptionc Implement regular maintenance of various classified streets by sealing newly formed cxacks. Sealing the cracks wili prolong the life of the pavement by stopping water from draining into the subbase of the road. Progress Summary: , Fufure Impact on Operating Budget: Budget: 2010 rrv actuai 2011 10 audget Budget Expenditures Budget Balanee Adopted Budget - - - - Budget Amendmems - - Adjusted Budget Activity: (Wevious Yrs) 2010 YE 2011 Year End , Total Projeet Funding Sources: Prfor to 2010 Estlmate 2011 Budget 2012 Bud et Proect Total Cost . Unrestncted SYreet Revenue - - - - - - umrty rax - 100,000 100,000 100,000 200,000 700,000 rzEer . - - - - - - Bond proceeds - 7ota1 Funding Sources: - 100,000 100,000 100,000 200,000 700,000 Capltal Expenditures: . Design - 10,000 10,000 10,000 20,000 70,000 Right of Way - - - - - - Construction 90,000 90,000 90,000 180,000 630,000 Total Expenditures: - 100,000 100,000 100,000 200,000 700,000 Forecasted Project Cost: Tolal Ezpenditures 2013 2014 2015 2016 2011-2016 Be d 2016 Funding Saurces: Unreshicted Sheef Revenue - - - - - - Upifity Tax 100,000 100,000 100,000 100,000 600,000 - REET - - - - - - Bond proceeds - - - Total Funding Sources: 100,000 100,000 ' 100,000 100,000 600,000 - Capltal Ezpenditures: Design ' 10,000 10,000 10,000 10,000 60,000 - RigM of Way - - - - - Construction 90,000 90,000 90,000 90,000 540,000 Total Expenditures: 100,000 100,000 100,000. - 100,000 600,000 - Grarrcs ! Other Sources: Roadway Preservation Projects 69 City of Auburn Tr. ansportation Improvement Program LOCAL STREET FUND (103) Capital Facilities Plan Six. Year Capital Facilities Plan, 2011-2016 Speaal Revenue Funds Project Title: Local Street Improvement Program ' Project Na Various TIP #37 Project Type: Non-Capacity Project Manager. WiCkstrom , Description: ' This program was created after passage of Proposition 1 on the November'04 ballot, setting the City's property tax levy limits and creating a dedicated bcal street fund to be used soleiy for local street improvements. The program will focus on the preservation of local streets (undassified streets) within the City of Aubum. The work will include crack sealing, asphalt patching, pre-leveling, asphait overlays and roadway reconstruction. The property tax levy lift may also be used to repay bonds should they be util¢ed to fund this , program. Progress Summary: This program has successfully completed overlays since 2005. In 2011 and 2012 the program will focus on major street reconstruction where street surFaces and the underlying base has failed. Future Impact on Operating Budget: . None Budget: 2010 r7n aetual 2011 10 eua9et Budget Expenditures Budget Balanee Adopted Bud9et Budget AmendmeMs Adjusted Budget Acfivity: (Prewous Yrs) 2010 YE 2011 Year End Total ProJeet Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget Proct Total Cost Local, Street Fund 703,800 - - 703,800 703,800. PropeRyTax 3,905,100 7,500,000 2,200,000 2,200,000 7,605,100 18,605,100 Utility Mdigation - - Bond Proceeds Ofher Total Funding Sources: 3,905,100 2,203,800 2,200,000 2,200,000 8,308,900 19,308,900 Capital Ecpenditures: Design 396,400 250;000 200,000 200,000 846,400 1,846,400 Right of Way - - - _ _ _ ConsWction 3.508.700 1.953.800 2.000.000 2.000.000 7.462.500 17,462.500 Total Ficpenditures: 3.905.100 2,203.600 2,200.000 2,200.000 8,308.900 19.308.900 Forecasted Project Cost: Total Ezpendkures 2013 2014 2015 2016 2011-2016 B ond 2016 Funding Sources: Loca/ Sheet Fund - - - - _ _ PropertyTax 2,200,000 2.200,000 2,200,000 2,200,000 13,200,000 - Util'dy M'rtiyation - - - - - - Bond Proceeds - - - - - Other 7otal Funding Sources: 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 - Capital Ezpenditures: Design 200,000 200,000 200,000 200,000 1,200,000 - Right of WaY - - - - - ConsWction 21000 000 2,000 000 2,000,000 2,000,000 12,000,000 Tota( Expenditurea: 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 - Grants i Other Sources: 70 Roadway Preservation Projects ~ c20; no i a St Nw, Pna,a i (5rd St Nw to 14in si riw) Ps C409A0 3 Aubum Way Imp (4th 3l NE to 4lh St SE) A'12 1'8,251 - - if 1;i,7Gu 3,00n'l,00i' - - 3.t;5c.951 C415A0 4 I St NE (AOth St NE to S:nd St NE) NIA 11,6-1! 4ti0,000 1,020,00(1 d,280,000 - 5,771.827 C201A0 5 M St SE Grado Soparatian (E Mein to AWS) PS 5.498,500 2.115,000 12,085,000 11000,000 - • - • 22,390,500 C222A0 G 5 277th 5[reet (AWN lo Grcen Rivcr Bridgo) A'11 II~,0;16 276,500 803500 3,000.000 - - .:,G99,OB5 cpxxxx 7 15th St SW Roconstruction (C 3t SW [o UPRR) A'12 - - - 375,000 3,000,000 - - - 3.375,000 cpzxxx 8 A St NW. Phasc 2(W Main t0 1rd St NW) A'10 25,0 CC 75.000 162,000 2,2,98,000 - - 55p pOG cpuxxz 9 D St NW (37th St NW to 44th St NW) A'14 - - - - - 200,000 200,000 6,000,000 6,400,000 CP0911 10 F St SE (Jth St SE to AWS) A'13 7.620 1,110C.000 - - 1.2 Oi,p2G cpxxxx 11 M St NE (E Maln St to ath St NE) A'13 - 50,000 - • 275,000 7,000,000 - - 1.325.000 cpzzxx 12 Grade-Soparated Crossing of 13NSF Railyard NIA - - - I 1.C00.000 31.000 ,OC.6 . 2.OC0.0~11 ~ CP0916 14 W Valley Nwy (SR 18 to W Main St) S 465,000 4,535,000 • - • - - - 5,000,000 cpxaxx 15 B:I7 St NE ~Plku St to R SI NEi A'l : - ~ - :60.CLU I.uUD.[YUU - - I.1~O,JGO I cpxxxx 16 49tD St NE Irom Aubum Way North lo M St NE N/A - 850.000 2,500,D00 • - - - - 3,350,000 ~ Varios 33 Trat(c Calming Improvomunts NIA 1142,906 OGIi 200,000 200,0qG 200.000 ~ 200.JUG 20r:1.9e2,50C cpxux 39 124th Ava SE Cortidor Imp Phasu 3 A'14 - - - - • 100,000 750,000 - 850,000 ~ cpzxxx AO 124ih Ave SE Corridor Imp Pha5e 1 A'17 - ~ :~0.000 1 ~QOClO 1.'b0,000 - 1.950.00C cpzzzx 41 124th Ave SE CoMdor Imp Phasn 2 A'12 - - - 30,000 150,000 1,O013,000 - - 1,180,000 ~ cpxxxx d: SE 120th St Corridor Imp A'13 I .sC,C.^.~"i SCO.L'Cl: cpxxxx 52 Oowntown Promenada Imp S 1.2C0,000 11.800,000 - - - - - - S,OCQGOC Subtotal 12.062,559 21.993,500 16.173,500 7,375,200 13,625,000 I 7,840,000 ~ 2,730,000 37,000,000 118,799,759 I CP0611 17 FlarvoyBth SVCet Imp - Debt Service N!A 76 ,50C CP0701 18 8th StreetlR Street NE TraMc Signal S 647,400 s;g,qpp cpzzzz 19 Au6urn Way Nortlti'f Strcet NE Signal Imp A'11 - 2U,0 ~0 i:0:i - - ~ - 6'?9,: = ~ cpnxxx 2D Aubum Way South and M Stroet SE A'12 25,000 75,000 - BOO,OOp - • - 1,000,000 cpxxxa 21 C Strect NW antl West Mafn Streei A'12 - - - - - - - - 1017.000 1,000,00P - I 1,16D,000 cpxxxx 25 F Streot SE S 4th St SE TmMc Signal S 396?00 7000 - • - - - 397,700 I cpxxxx 38 Railroad Crossing Safaty Improvomonts A'12 1.01110 ,0011 cpz~ 43 Auburn Way Sou[h 8 Riverwalk Imp A714 - - - - - 750:000 2,250,000 2,400,000 Subtotal 3,196,942 164,700 107,300 1.817.000 1,936,500 236,000 ~ 2,336,000 996.000 10,790.442 Cpxxxx i SOUth Aubum ITS Exp:insVUn S 1.. Varies 34 Tra(ficSigrtallmp N/A C;00 175.000 775,u,^,0 775.00U 775.600 17'.'.100 175.000 1.225.O00 cpazzx 50 ITS Dynamlc Mossaga Si9ns A'11 - I - ~ I . - Hf'O.: I n cpxxxx 57 East Vallcy Hwy ITS Expansion A93 - • - - Ao6,0Ci0 - - gp--,ppo Subtotal 978,400 176,000 ~ 175,000 ~ 175,000 ~ 1,195,000 175,000 395,000 880,000 4,149,400 cpxxzx 2 Aubum Way South CorriAor Improvemenis Phaso 1 A"IO I-,t;i!fI _ . I . - C507B0 22 Skinner Rd to 3rd Ave (Auburn Pacific Trsll Ph 2) S 102,077 1.0OU - C229A0 23 6NSFIEast Valley liwy. Ped Undurcrossin9 PS 224.;siiU - 4,800.000 ;,OGO.OOG 1G,J24.30c cpxxxx 24 Academy Drive Multl Use 7ra{I A'12 • - - 10,000 150,000 425,000 425.000 1,010,600 NA 116 Aubum Cornmunily and Lakuland SBultles NiA 30C,t„'t 22p.000 ~:u.C>JO I :20,1100 220,000 120.7f)0 220,006 1.tiZQ6"<8 Varios 90 Citywidu Padoshlan Crossing Program NIA 100,000 - 100,000 • 100,000 - 100,000 400,000 Varies 11 Citywidc Artenel l3icycle 8 Safnty Imp N1A iCl.3!10 1i)O,O;lO W0.000 1C0.1t70 100,000 619,30D Varles 32 Cltywide Sitlowalk Improvements NfA 225,100 180,000 20,000 180,000 20,000 180A00 20,000 825,100 cPxxxx 44 A St. NE Pedos[rinn linprovcrnonts A'12 cpxxxx 45 Intorurbnn irailhoad Improvomonts A'13 • - • • 210,000 • - 210,000 cpzxxx 53 57th St SE & R St SE Pednsln;in Conneclor 5 .i:lu - - 125,3~0 cpxaxz 57 Lvn Mill Pudastrlan Improvamonts A'70 - 57,080 296,820 - - - - 353 '00 5ubtolal 1,155,705 719,080 1,417,620 660,000 800,000 925,000 5,665.000 5,000,000 16,342,405 cvxxxx 27 aist s; sE.pid a St Se ncca- m;-.,cn•~=~,~~tsn.dy N?n C41 OA 29 S 277th Struot -Wetland Mitigntion N!A 203,840 25,000 25,000 25,000 - - - 276,640 cpxzzx 46 1 OAth Avc SE & Grvun Rivwr 5tudy NIA 7,00n0 3,000 5,000 cpxxxx 47 Envlrammental Park Roadwaylmprovamonb Stutly MIA - 5,000 5,000 cpxxxx 48 Dowotnwn to Los Gove Non-Mocorir,ocl Imp Shuly NIA cpxzxx 49 S. 316th St Oicyclo 8 Padeetrian Imp Study N1A 7,000 4,000 - • - _ - 5,000 cpxxxx 54 Karsoy Way Study NIA IL'O,C00 cpxxxx 55 Mary Olson Farm ImprovomanW NIA 137,05 1,000 - - - • 738.085 Subtotal 345,725 156,000 25,000 25,000 - - - - 551,725 cpxxzx ?a Amwal6ridryeMelntenmico WA 6Citll1(1 I.~.)01: 'Ii,Yi, Varios 35 Artorinl Slreots (105 Fund) NIA I,5O5,000 1,400,000 1,400,000 I,40p,o(iU 1,4110,000 1.400,000 1,100,000 9,905,000 Vafios 36 Artorial Crack Soal (105 Fund) N1A IUO UCl(I 100,00I7 tDii Dn0 lir',,iiiin 100.0110 100.1Of~ ~ ICL':,DOiI 7011) il00 Varies 37 Lowl Streets -SOS (103 Fund) NIA 6,108.900 2,200,000 2,200,000 2,200,000 2,200.000 2,200,000 2,200,000 19,308,900 I Subtctai 7,765,900 3.750,000 750,000 3,750,000 3,750.000 5,750.000 ~ 7,750,000 29.913,900 ~ TOTAL 25,503,231 26,959,280 I 21.648,420 ~ 13,802,200 21,306.500 12,926,000 I 14,876,000 43,876,000 180,547,631 from I-f05 to Sr-I a. ndd onv N6 and SB {lunural purpasc lano; from SR-1tl tu SR-161, ,idd onu NB HOT lunu and onu SC3 HOT lanc, aUtl diract N!A 80 SR-iG7 Expanswn (I405-SR5091 WSDOT N6150 hIOWHOT lono connoction rantps bulw4en SR-167 8 I405; add Nf3 nncl SF3 :iuailiary lanes betwuun SR516 and S 277th 5trcet; extend 4 . Sr 167 from FiR. 161 (o SR-509. N/A 81 SR•18 6 SR-767 Intnrehange - W5007 Comploto treoway intorchanpm by adding aaat6ountl SR•18 rnmp W soulhbountl SR-187, oddlnfl northhound SR•I87 ramp to WB SR-18 antl 45,000,000 Gosing SR•18 accose to Woat Vallay Hlphway. I NIA 82 SR-164 Corri(lor Improvomunes (SR-18 to Awdomy Onvo) - Construct corrltlor improvomonts conr.ifilont wllh WSDOT SR-164 Corndor Improvemunt StuAy. Pro)oct incluUCS Inlorsection irnprovomonts, ii 1,000.000 WSOOT roadway wideniny and roadside improvamenls. NfA 85 SR•164 Aubum Bypasa Road (SR•764 to SR•18) - W90flT Construct Auburn bypaas rood eannacdng SR•164 and SR-18 oait of R ST conidor. 65,000,000 NIA gp Graon Rivor Class I Trail. (SR-79 to Northem City limiq - King Construcc Class 1 Treil alonU Greon Rivcr Gom SR-18 to Northcrn Cily hmits. ?.p J~Counl WA BS 51st Ave S 3 S 316tb 5t Signal - King Counry Conetruct naw traMc siynal et Intanocdon af 51at Ava S and S 316th St with tum larns. 550,000 N!A BG Stewart Roatl Widnning (EVH to SR-167) Pierce County Camplete a tive lane soction roadway with now 6ritlgo over thu whita rivor ond rallroad grade separetion Irom EVhi to SR-167. 3'~,30U,Ji_S NfA 87 Aubum Transit SWtion Parking GaraqeSoundTransit Conatruct a now parking qarapo at tha Aubum Tonslt Shtlan 31,60D.OL'L' TOTAL 4.637,550.000 'Grant 5 = Status PS = FarU[,b.y l A= ApPlied or wnl anuly f 10 = Yeer .~f)f~Cllc~l_l.1 N W E City of Auburn 2011-2016 AUB URN ~ Transportation Improvement Program 5 6 - *zNTTsT. 16 SE-281sT•r 7 t__ 1 4 ~ ~ • ~ 9 L '(EXACT LOCATION ~ _.SQV1ND:lI~ ~ H"S~N Et., ,%T_0 BE-DETERMINED) - . _ f 7rH x bz~°''' 3•sr• ~ ~ c i _ w w _ ' _ ~ ( Z x rnrnaq f vi k i~( 8 `--i•n - ri - o-. .n~r w , n:e~w~.._~ n . . I 16~/ / v s ~e 1~ .~~~w ra; I ~ \ ✓~i ~ . t_' P CMt ~ ~ ~ Q - SC•.4TTN1f , II ~ ~ ~,J( ~ .-1F-y.fppmltJ ,o~~~•,~ , ( h br~-,~ NI - n~,, I- Y29VIr ~I FJ ~AIIIGiMt Z ~ +-f - Z ~ 4NU ]~tM~Sr~~c-~ r yl ( W_ . I d ~ ~n~-, ~ f ^y ~ r Y O fwc ~ T-l6i41Tf~NL •l--~ r. (y iI°'.Rn su'~..i ia/+mn ~ SE^'30~STH1 i a~ rn \a J s c ro s r H 1 y f-' , ~ SW7T ~)T, ~ ~/J~]/~ ~ ~ . ~T> i ~,~\i/`'1'~ ~ {~arn r~ ss~iorn~n~ ~ c~ ~ x roan,.a. 1;, W ~ Z I. I.r~ S"N(f~~ I YIPJTH ST~ 1 ; 3 w : a I 3 i nrHSr.~a i~l I r-- U I~ Fi ',cri,oapc~ 56 _ 161 .S.raNw 41 A n 15FF1-5,7. N = r 5, ie I- 1~-J SE 312TiMI5 / i) masr 4~ w ~ '7 ~ W ~r- 85 f~ 5,346THr5T ITill'STNf 1- I o LI ' x ~ I I~-- ~ { r IITHit k -s-,s~~ 5 .a,enrsl-~ \j i „ I~ 4N OTH~SE mni ~~-Ne ...-15 U ~ ~ i -~7 - ~anrffisi N~- - - - • , ~ ; 944 ~ ~,17 ~ 39 ~ ~B 51-C1. ~}7 _j 18~~~;~ 42 18 r h 383 NW~ : i 1snnrst a ~ wMny i~sr 14 97 ° ErN1A~N•sT -D1N~,°~•,- r - - - - - ~ i ~ I I ~,no s~c ~ 12 1 , I ~ ~ ' ~•n,~•w I ~ 5~ 2. ,5 81 J I:E~ I_~7'=CA' ~ -~j M iVynN 'r .•y ~8 - ~ nril '.r 0 3 ~ ion'~zrsi ~ ~ I ~ ~~'1• nP 5`~ {uitnMn~.i-w~.. ~irI 'r-u' l l W LL I ~ - V J ~ ~~-BOl1NDARY-BLW3•SW-z-.,;i" ~ 3 ~'~M"41zT` ~20. .-(FUTURE ALIGNMENT ~ ~ innsr. J-~- ~ 1JTH-ST SE- ~ ~h` s~TO.~B&<DET7RMI~IED). . sG. 43 3: I Y H ._.:~rH;r.c car:` 2 N ~ ~ ' NSS \ eerns-yl ~ ~nQ', a1rf` _ - • ~ ~ T.r-29TH SME I 8 ^ i~ , , „7 r ~st.~ -'e"~. ~~i~~u.r:c, i J~. w~ I GBCG ~,.o'•11E'Y~,• .;aos-=u~ o'V~ ' S 167 271 ~f ~1 ~ no.•u y~,~~ ~ A~ Z L r-------'~_.t-~ O~~_ .✓-i ( 22"~`I,23 . . II ~ S ,'/~'E~• 4y ~~,rS~ , w ,of• tif 7 h ~ m' ~'hSF ~ W = ~ 1- ✓ ~ W ~ t~ ~ 51 Ap~,, ~ ~ ~r ~ ~ - -~1.~__ r~.~, _ _ _ _~:t 86 - ~ Intersection Improvements Recommended Regional Projects ~ Potential Annexation Areas Parks Non-Motorized Improvements ~ Prelim Eng and Misc improvements A/ywndix B Water Feature ~ Roadway Improvements ~ Signal Et ITS Projects ; Auburn City Limits i