Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WVH GEOTECH 2
Appendix A - Photographs Photo 1-Pavement Core Recovered at CPT-03 Photo 2-Pavement Core Recovered at CPT-09 Photo 3-Test Pit T-05 Road Fill Photo 4-Hard Native Soil on Cut Photo 5-Test Pit T-07 Hard Native Soil of Hillside Photo 6-Test Pit T-01 Groundwater and sloughing sides West Valley Highway - 35 - Geotechnical Report 2 June 2010 Photo 7- Slope of Cut and Hill Side (note small existing cantilever wall which protects the base of the drains) Photo 8- Seepage at Sta. 8+00 West Valley Highway - 36 - Geotechnical Report 2 June 2010 Appendix B - CPT Logs West Valley Highway - 37 - Geotechnical Report 2 June 2010 West Valley Highway - 38 - Geotechnical Report 2 June 2010 West Valley Highway - 39 - Geotechnical Report 2 June 2010 West Valley Highway - 40 - Geotechnical Report 2 June 2010 West Valley Highway - 41 - Geotechnical Report 2 June 2010 West Valley Highway - 42 - Geotechnical Report 2 June 2010 West Valley Highway - 43 - Geotechnical Report 2 June 2010 West Valley Highway - 44 - Geotechnical Report 2 June 2010 West Valley Highway - 45 - Geotechnical Report 2 June 2010 West Valley Highway - 46 - Geotechnical Report 2 June 2010 Appendix C - Signal Pole Foundation Soil Strength Table (WSDOT Geotechnical Design Manual M 46-03, December 2006, Chapter 17) West Valley Highway - 47 - Geotechnical Report 2 June 2010 Appendix D - Pavement Design ESAL Calculations: ÚØÉß Ê»¸·½´» Ý´¿ ìôëôêôé èôçôïð ïïôïîôïí Þ«» ÛÍßÔñ ª»¸·½´» ðòì ï ïòéë îòë îëî çî ïð îí ߪ¹ò Ü¿·´§ ݱ«²¬ ïððòè çîòî ïèòï ëéòì ßÜÔ íêèðè ííêëè êêïê îðçëë ÛÍßÔñ§»¿® Ü»·¹² Ô·º» л®½»²¬ ëõ ¿¨´» ̱¬¿´ Ç»¿®´§ Ù®±©¬¸ Ü»·¹² Ô·º» Ü«®¿¬·±² ¬®«½µ ¿²¼ ¾«» ÛÍßÔ Î¿¬» ÛÍßÔ ø§»¿®÷ ïû +,41.íòëû 2Ë--2Ë01, îð West Valley Highway - 48 - Geotechnical Report 2 June 2010 Appendix E - Test Pit Logs West Valley Highway - 49 - Geotechnical Report 2 June 2010