Loading...
HomeMy WebLinkAbout05D1847■ ! 1 5 10 20 li li s ■■■� SURVEY NOTES: Legal Description [As per FIDELITY NATIONAL TITLE COMPANY] PARCEL A The East 90 feet in width of the following described property: That portion of Tracts 23 to 26, inclusive, RIVER VIEW ADDITION TO AUBURN, according to the plot recorded in Volume 9 of Plots, Page 90, in CITY OF AUBURN, Washington, and of the Filled Bed of the White River in the Southwest quarter of Section 18, Township 21 North, Range 5 East, W.M., in CITY OF AUBURN, Washington, and of Government Lot 4 in said Section 18, and of vacated Fourth Street Southeast and vacated alley adjoining said premises, all of which is more particularly described as follows: Beginning at the intersection of the Easterly margin of "A" Street Southeast in the City of Auburn with the Southerly margin of Cross Street Southeast as now established, which point bears South 0'14'20" West, a distance of 40.40 feet from the Southwest corner of Tract 22 of said River View Addition to Auburn; THENCE South 73'06'11" East, along the Southerly margin of said Cross Street Southeast 675.23 feet to the Westerly margin of "C" Street Southeast; THENCE South 947'26" East, along said Westerly margin, 156.79 feet to the Northerly margin of the Northern Pacific Railroad Right-of-Woy; THENCE South 88'02'50" West, along said Northerly margin 172.25 feet to an angle point therein; THENCE North 1'57'10" West 10.00 feet; THENCE South 88'02'50" West, along said Northerly Margin 477.55 feet to the Easterly margin of said "A" Street Southeot; THENCE North 0'14'20" East, along said Easterly margin, 365.19 feet to the point of beginning. Situate in the County of King, State of Washington. Project Information TAX LOT NUMBER SR'E ADDRESS 733140-0450 407 Auburn Way South CITY OF AUBURN ASSESSOR ® Cross St. SE Auburn, WA 98071 LAND AREA 15,480 t Square Feet 0,3554 t Acre NOTES 1. FIDELITY NATIONAL TITLE COMPANY of Washington, Order No. 0170037 [Dated December 1995] WAS RELIED UPON FOR TITLE INFORMATION AND RESEARCH, PLEASE REFER TO THAT REPORT FOR ADDITIONAL INFORMATION REGARDING FINANCIAL MATTERS BEYOND THE SCOPE OF THIS SURVEY. 2. UNDERGROUND UTILITIES AND IMPROVEMENTS DEPICTED HEREON ARE BASED ON FIELD OBSERVATION, MARKINGS, AND/OR AVAILABLE PLANS AND DRAWINGS. THE TRUE LOCATION, NATURE, AND/OR EXISTENCE OF BELOW GROUND FEATURES, SHOULD BE VERIFIED. 3. DATA FROM CITY OF AUBURN DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION EXHIBIT DRAWING "AWS - 4th ST SE to 6th ST SE BNRR BRIDGE REPLACEMENT". THIS INFORMATION IS NOT SHOWN ON THE TITLE REPORT PROVIDED. Survey Wormation PROCEDURE / NARRATIVE A FIELD TRAVERSE USING A "LIETZ SET 4" TOTAL STATION, AND "SDR-33" DATA COLLECTOR, SUPPLEMENTED WITH FIELD NOTES, WAS CONDUCTED TO ESTABLISH THE ANGULAR, DISTANCE, AND VERTICAL RELATIONSHIPS BETWEEN THE MONUMENTS, PROPERTY LINES, AND TOPOGRAPHIC FEATURES AS SHOWN HEREON. A "LIETZ B-2A" AUTOMATIC LEVEL WAS USED TO CHECK AND ESTABLISH THE ELEVATION OF BENCHMARKS AND SURVEY CONTROL POINTS. THE RESULTING DATA MEETS OR EXCEEDS THE STANDARDS FOR LAND BOUNDARY SURVEYS AS SET FORTH IN Washington Administrative Code 332-130-090. DATES OF SURVEYS FIELD SURVEYS BY BARGHAUSEN CONSULTING ENGINEERS, Inc. CONDUCTED MAY 13, 14, & 23 1997. ALL MONUMENTS SHOWN AS FOUND WERE VISITED AT THAT TIME. HORIZONTAL DATUM - BASIS OF BEARINW THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION 18, WAS TAKEN AS NORTH 00'21'30" EAST, As Per THE DATA SHOWN ON BOOK 6, OF SURVEYS, PAGE 191, RECORDED UNDER RECORDER'S FILE No. 9605180603, CITY OF AUBURN Records. VERT1CAL DATUM - BASIS OF ELEVATIONS PROJECT BENCHMARK City of Auburn - NAVD 88 TOP OF 2" BRASS DISK IN MONUMENT CASE AT THE INTERSECTION OF "D" STREET SE. AND 4th STREET SE. CITY BENCHMARK # 01-V ELEVATION = 88.34 feet SITE BENCHMARK TOP OF SE BOLT OF SIGNAL POLE BASE 0 NORTHEAST CORNER OF SITE (SEE DRAWING) ELEVATION = 83.37 feet SW 1/4, SEC 18, T'WP 21 N, RGE 5 E, WM CROS SS �R �"�j 4 o QL4/ n 1 i 1 9ro � \ DUMPSTER nonnonc�n PARKING 710 f ; Q�Ojf S Q 5TI I ST _ NW hE PARK AV �'�/325TH y P AT T Q [ AD ST NW Sku Cu ZND CONT HS I-' Ln cn a M - ST ! NW 4 a 2N»r4 s' HO i " a ST ST NW o J IS[ _ yr t 3 3 CH 4 ccN ST Zp;i = sar ace W � to SIA 1N ST SW "' 2ND ~ ;ND STV,I SN SW - 4TH ST Al � -, n 4Ti lH E E".+dIF: 3TI 6T h SW t _ F wx FTH ST SE & / %8TH .ST _ 1 /TH ST SC - � W� r c SfIPER MALL OF - ** _ P.TH _- �T �E j b rh ST se THE GREAT NOR T11WEST ST = SE w ITH - ST SL c TERM non ____ 20:91�on-aa 3�x. Mrpf. VICINITY MAP GENERAL NOTES These eight notes are shown on the cover sheet of the approved plans. 1. This development project shall conform to the City of Auburn's requirements and be in accordance with the approved plans. Any changes from the approved plan will require approval from the owner, engineer and the City. 2. All workmanship and materials shall conform to the "Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction" (2000/latest edition), except where supplemented or modified by the City's Construction Standards manual. Copies of the above documents shall be available at the job site during construction. 3. A pre -construction meeting shall be required prior to the start of all construction. Contact the Public Works Department at 253-931-3010 to schedule a meeting. 4. Locations shown for existing utilities are approximate. The contractor is cautioned that overhead utility lines may not be shown on the drawings. It shall be the contractor's responsibility to determine the true elevations and locations of all underground utilities and the extent of any hazard created by overhead utility lines. Identification, location marking and responsibility for, underground facilities or utilities, is governed by the provisions of Chapter 19.122 Revised Code of Washington (RCW). Prior to starting construction, the contractor shall call ONE -CALL (1-800-424-5555) for utility locations (water, sanitary sewer, storm sewer, gas, power, telephone and television). 5. Prior to the start of construction a proposed route and schedule for hauling material to the site shall be submitted to the City for approval. If the City believes that the proposed haul route will adversely impact the street network, hauling may be limited to appropriate off-peak hours or alternate routes. 6. The contractor shall be responsible for public safety on and around this project. Prior to the start of work, all methods and equipment used for traffic control and street maintenance shall be submitted to the City for approval. Contractors and their 0 surety shall be liable for injuries and damages to persons and property suffered because of contractors operations or negligence connected with them. V / 7. All construction surveying for extensions of public facilities shall be done under the direction of a Washington licensed land PROPOSEDsurveyor or a Washington licensed professional civil engineer. 8. Certified drawings are required prior to project acceptance. Refer to the City's "Record Construction Document" handout. BLDG >- FF=84,53 Q CONSTRUCTION SEQL 1. PRE -CONSTRUCTION MEETING WITH CITY OF AUBURN AND CITY OF AUBURN INSPECTORS. CALL 253-931-3010 TO SCHEDULE MEETING, 2. FLAG OR FENCE CLEARING LIMITS. 3. INSTALL CATCH BASIN PROTECTION IF REQUIRED. 4. GRADE AND INSTALL CONSTRUCTION ENTRANCE. 5. INSTALL PERIMETER PROTECTION (SILT FENCE) 6. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPESLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 7. REMOVE EXISTING BUILDINGS, PUMP ISLANDS, CONCRETE, AND ASPHALT. 8. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF AUBURN STANDARDS AND MANUFACTURER'S RECOMMENDATIONS, 9. RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL �`�. IS ALWAYS IN ACCORDANCE WITH THE CITY OF AUBURN EROSION AND SEDIMENT CONTROL STANDARDS. 10. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 11. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 12. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 13. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMP'S REMOVED UPON APPROVAL OF CITY INSPECTOR. RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS BY: NOTE TITLE/POSITION: CONFIRMED BY CITY: SITE ADDRESS: 407 Auburn Way South 0 Goss St SE PROJECT REF: BL ' ,� �eryo THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN'S ENGINEERING DIVISION REQUIREMENTS APPROVED DATE APPROVED: EXPIRES 5/14/ SITE DEVELOPMENT SERVICES 310 208TH ST SE BOTHELL, WA 98012 (425) 481-9687 (42.5)485-7199 (FAX) 12/4/04 REVISED PER CITY COMMENTS 11/2/04 THIS SHEET ADDED PER CITY COMMENTS BIC-l"FOOT JAVA --- AUBMkN DATE: 9/7/a4 DES: JK & DCD SCALE. 1 "-10' Y DWN: JK COVERSHEET TRIMARK PETROLEUM GROUP LLC (CONTACT: AL JIWANI) 406 ELLINGSON ROAD #10000(1 PACIFIC, WA 98047 IF /89 7 PF°' I33 MEET I of EXST CB INVERT TABLE CATCH BASINS CB-B RIM = 81.19 12' ADS S = 76.79 C B- C RIM = 82.41 6" COMIC S= 81, 21 CB-D RIM = 82,42 12' CONC NE = 76.59 CB-E RIM = 85,50 4' CONC SW = 84.00 TIRM DRAIN MANHOLES SDII .RIM = 81. 15 12' PVC N = 76, 42 12' PVC W = 76.42 8" PVC SW = 81.94 12' PVC S = 77.43 12' PVC E = 74.91 12' PVC NE = 76.54 PLUG SDMH-B RIM = 81,39 30' CONC S = 76- 41 30' COW NE = 76.41 12' CONC SW It 77,89 SDMH-C RIM = 81.77 24' CONC S = 76.77 24' CONIC N = 76.82 SOW-D RIM = 8L 74 30' CONC SW = 76.54 30' CONC N = 76, 54 24' CONC SE = 76,59 SDMH-E RIM = 82.86 30' CONC N = 76.43 30' COK S = 76, 41 12" ADS W = 77.21 12' ADS E = 77.03 SDMH-F RIM = 83.40 12' ADS N­ = 78.27 12' ADS E = 78.15 12' ADS S = 78, 30 VER MANHOLES SSMIH-B R I M = 82. 79 18' COW S 78, 71 18' CONIC N = 78, 61 l a SW 1/ , SEC 18, TWP 21 N, RGE 5 E, WTI STREET LIGHT 77 I-P / ""► .� h� BACK OF EXST WALK CLEARING LIMIT f / A/ CB-D / / --WATER �'�'' �````�-�,� / / VALVES \� p 4'' / // a I CD NUJ IN MON I I I I � I I a. \ SILT i : � a N ( I \ \ FENS � °� V SITE BENCHMARK 0 HYDRANT �'`' TOP SE BOLT \ PROPERTY `Ltk ELEV 83.37' \ \ ACQUISITION \ (SEE NOTE 3) I ( I \ \ \ I _.WAT E F: VAVI l TRAFFIC 2' # I SIGNAL W/ \ \ I I ` c� MWO(�ITSORING I LIGHT STREET q CABt_E \\ I I o I J- hox I I I I 41 a r i IV I I _ i I I I 5025"1 I I o ti CONSTRUCTION I d 112 R /W I I\ 1 I ENTRANCE. I I \ PLACE AT EXST C.O.AL STD DET EROSIbN-01 I I I I I` I I I / J I MONI fORINC;._.._w-__ _ WELL.. _ I i I �0 12"\F0RCE PAIN _ I- 'I FI FPHnNF \. 1• . _1 �s I I 0-` �I d 0 SACK OF EXECT WALK i I /( LnIld in CILEARNG ill I /r I I � l I I i I N� I / I I I 1 Li_J o 1 0. I �f c�• d I I h, -� // 17 I I 4 I i a I I D I I METER � fx� I •� 7 ° I I I I I I 4 I I E�'C vv -1 LIMITRiNG / I °° \ —J -LOX I f- �iMf i li I I I [A SMH--801:!..6 P�)W LT /�- _ (NOT SURVEYED) / _�\ =D )MCI c — I VAULT CAP V� FENCE I \ GUY— / 114"0 CONC / I WIRE �;-� `J Aul�r CAP V�JTE PAL d ~ �� I / �� I CLEAG LIMIT Q i ) a / I L� " `� W I �> I � i I ' I M(:)NIT()f Q 5" - — — J-COX f 'UTILITY POWERIN I � _�-% I _ —S_ POLE CABINEtS h' � _ I N -- -- P U G) ..� :�. _ SDMH -A x ------ --- PUMPSTATION TESL MEASURES TOTES: 1. CONTRACTOR SHALL ATTEND MEETING WITH CITY'S INSPECTOR PRIOR TO ANY CONSTRUCTION. . ANY ADDITIONAL TESL MEASURES— AS DETERMINED BY CITY'S INSPECTOR— SHALL BE IN PLACE PRIOR TO AND DURING CON TREK TI Oil. 12/4/04 REVISED PER CITY COMMENTS 11/2/04 REVISED PER CITY COMMENTS 10/14/04 R!EVISEp PER CITY COMMENTS SITE ADDRESS: 407 Au Y Auburn Wa South 0 Cross St SETC 1R(IO RECORD DRAWING CERTIFICATION PROJECT REF`: OL-0443 •t'f� DATE: 9/7 4 DES: JK & DCD THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS THESE PLANS ARE APPROVED FOR SCALE: 1 =10 Id: ` CONFORMANCE WITH THE CITE' OF AUBURN'S BY: NOTE: ENGINEERING DIVISION REOUOEMENTS SIC P LAN TITLE/POSITION: APPROVED BY: A TRIMARK PETROLEUM GROUP LLC (CONTACT: AL JIWANI) APPROVED: CONFIRMED BY CITY: DATE 4015 ELLINGSON ROAD #1000 PACIFIC, WA : 47 &I; �"� " a m EXST CB INVERT TABLE CATCH BASINS CB-B RIM = 81, 19 12" ADS S = 76- 79 CB-C RIM = 82- 41 6" CONC S = 81, 21 CB-D RIM = 82- 42 12" CONC NE = 76,59 CB—E RIM = 85,50 4" CONC SW = 84,00 STORM DRAIN MANHOLES SDMH-A RIM - 81,15 12' PVC N = 76,42 12' PVC W = 76.42 8" PVC SW = 81.94 12' PVC S = 77.43 12" PVC E = 74,91 12' PVC NE = 76.54 PLUG SDMH-B RIM = 81,39 30" CONC S = 76.41 30' CONC NE = 76.41 12" CONC SW = 77,89 SDMH-C RIM = 81,77 24" CONC S = 76,77 24' CONC N = 76,82 SDMH-D RIM = 81.74 30' CONC SW = 76.54 30' CONC N = 76, 54 24" CONC SE = 7& 59 SDMH-E RIM = 82.86 30* C12NC N = 76,43 30" CONC S = 76.41 12" ADS W = 77.21 12' ADS E = 77.03 SDMH-F RIM = 83.40 12' ADS N = 78.27 12' ADS E = 78,15 12' ADS S = 78,30 SEWER MANHOLES SSMH-B RrM = 82, 79 18" CONC S = 78,71 18" CONC N = 78.61 F� SI if UL r, SECTION SALE: HOR- 1"=10' VERT- 1" = 5' WEST PA i SW 1/4, SEC 18, TWP 21 N, R E 5 E, WM C/ ► ,„,\ \ � � . 1 ._..j/ ` � ,, \ \ �� FUTURE BACK OF WALK, VIEWY GRADES ° 1MTMMOST RriA{D LOCATION CROSS St WATER BOX \ ` •�,,�'� /`/ a �` IMIMlflVEMENT PLANS. CB—D / / DATER � VALVES 1 '3 // �\ - •. / �'ro `` \\ , `�_.,,// `1- I - FND 3" BRA55 DISK-W/ PUNCH IN MONUMENT CASE ftft Cb INGRESS/EGRESS EASEMENT (PARCEL 8) CP.. I ``► ♦ '� rL WATER GRATE OVERFLOW. \ .,� SITE BENCHMARK VALVES CHANNEL TO VALLEY \ •• 1 � ��► • !�'4j( \ ` `" `.• .� HYDRANT j` ~ TOPE BOLT O PROPERTY' _ `�� �� �ELEV = 83.37' ACQUISITION ♦ Q (SEE NOTE 3) ♦ \ i I W Ln CQ, MNUMENT \ \ \ S O N WATER W \ \ L VALVE LLj \ it 4 \ `"�► SIGNAL REEL W/ ❑ \ 1 r1K \ MO ITORING I L \ I I I — a, CABLE \ ' J—BOX KEYSTONE EXST) i I ('%/�/ C 2'K. MAXBLOCK WALL I II ' I \ I I (VERIFY ADEQUATE I 5 a \ SPACE BE TYM A) 11 1 2 R W , i\ DRIVEWAY & I 1 / , \ RN WAY SOUTHi\ WEST R/W 90 \ as \ 86 \ i 84 I87.23 82 so I ( i AUBURN WAY SOU TH WEST R/W I � I SITE SECTION SCALE: HOR- 1"=10' VERT- 1" = 5' EMMM TOPOGRAPHY NOTE 11ERIF Y E XI STING TOPOGRAPMY IN AREA OF PROPOSED CONSTRUCTION PRIOR TO ANY WORK. NOTIFY ENGINEER IF CONFLICTS ARE MTIFIED. SnHG l `TUl Y NOTE: VERY DEPTH AND LOCATION OF ALL EXISTING UTILITIES (NETHER OR NOT SHOWN) IN POTENTIAL CONFLICT *,,PROPOSED CONSTRUCTION PRIOR TO ANY iiK. 90 \ r 88 i87.64 APPROX 86 I HI POMI T r 3 II i r 82 / �,, FA MONITORING WELL SSCO— l _ 12"\FOR_CE MAIN— � 5 C�3 TELEPHONE EARTHWORK QUANTITIES: NTITIES: i-BOX \ ,� CUT . 386 C.Y. FILL - 75 C.Y. NOTE 1. QUANTITIES ARE APPROXIMATE. CONTRACTOR TO PERFORM WORK AS REQUIRED TO BRING SITE TO FINISHED GRADES AS MOWN. 2. QUANTITIES OBTAINED USING 3D SURFACE MODELING THROUGH USE OF LAND DEVELOPMENT DESKTOP SOFTWARE. r.A ° I I Cb I EXST) I I \ I I CS / � � � I Ln PROPOSE BLDG \ II FF = 84.53 I �10 ----KEYSTONE I / a BLOCK WALL. ° 3'HI. MAX co \ I I I EXST) I I v I I X�� CB-8 I i I I ` :° 0- I , I I / I _ h C� I I 3: { 1 W TER TER 1 I I t i 1 1 I I �\ 1 41 1 (EXST) i t 75- 4 W VV W `�l W / QQ !1 J`BOX i I SDMH D II DUMP �� 11 ° I I i<3: CO i 11D le SSMH-c�09--65 I POWER , (NOT SURVEYED) t \ VA J LTS .00, I -SDMH-B // \ \ DMH-C I I � 84"0 aNC (EXST) VAULT�CAP p � EXPIRES 5�.1 `� EXST) � >- I­_1 I �� / / I I P (U G) `� - --- 1--�r(U-- -- -•Lj --- -p i f I GUY �� 1 14"0 CONC -W /TER U t /j I �'V SIRE WIRE J ° AUI� CAP V LVE � L� co ''' i i 310 20ll"I'H S1'SE 60THELL, WA 00 :4< ------ — — Q—= a — _ '� ' PARKING I I i I MONITORING WELL ( 4K UTILITY POWERI \—�_ POLE CABINEfS q�`'��� 1 �L ° I c�� I i 12/20/04 REVIV PER CITY COMMENTS & MYLARS CREATED 12/4/04 REVISED PER C'TY COMMENTS fir• — — \ 11 /2/04 REVISED PER CITY COMMENTS SDMH-A x — -. __ — — — __ _- PUMP STATION- '� _ (EXST) '1 �� ; j i i I I 10/14/04 REVISED PER CITY COMMENTS C� ---ACCESS- (EXST) 1\ / 34— SITE ADDRESS: 407 Auburn Way South ® Cross St SE BI�Ft��T JA�A -� A.�." RECORD DRAWING CERTIFICATION PROJECT REF: BLD04-0443 DATE: 9/7/04 DES: JK & OCO THESE DRAWINGS CONFORM TO THE SCALE: 1"=10' OWN: JK CONTRACTOR'S CONSTRUCTION RECORDS THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN'S BY: NOTE: P ENGINEERING DIVISION REQUIREMENTS GRADING AN 1`�I TITLE/POSITION: APPROVED BY: r Ir TRIMARK PETROLEUM GROUP LLC (CONTACT: AL JIWANI) CONFIRMED BY CITY: DATE APPROVED: % 406 ELLINGSON ROAD #1000" PACIFIC, WA 98047 `'- SW 1/4, SEC 18, TWP 21 N, RGE 5 Eq WM I Ktr'NV. "C" CU�tB '`�../ �"„�'�.,` �,. `` �.� \ \ li i (c.o.A#ao� Hs j 3:I I IN UK VATM WEST EDGE FIRE PROTEC ON `' \ I I I I 20 0 10 20 40 OF EXST DWY SERVICE POINT .\ TUBULAR MARKS O 3Q' O.C., , , �o I / "C" CURB. PLACE ALONG 1` _ " - &ATER PAINTED OR ROADWAY C/L. - - - _ _ � i _ _ _ _ _ _ _ 1 inch 20 ft. '``~. <" �� /vALVE SEE NOTE. - �. / X , c "NO LEFT TURN* SIGN. SDMH-F _TURE-lBY CITY: Quo; NOTE. FUSDMH-E I C\/ PLACE CB IN GUTTER ''`• '--.��� C'"�1 (%�/ f LIGf HT / E "C" �� � ° ° /� IN LINE WITH \ • 00 NO LEFT TURN S01. EAST EDGE `G 77AflQ ` \ 1 � , ` c . Q� SEE NOTE. /' OF EXST DWY .. RAIL BOXWATER N . N "� N,Q� // 0 WATER FUTURE BY CITY: "'C�• r `.. RELOC EXST INLET C fib -•• '' ''= �� TR BEHIND FUTURE WALK _ ••; "'• . T '`i \ �`• ' ~ `�� A CONN TO CB#2 ,�� _~`' •, _ /�i _ �� \ �,o i �� I I FNO 3" BRASS DISK W/ PUNCH IN MONUMENT CASE \ \ N� EXST C B INVERT TABLE INGRESS/EGRESS E•.ASEMENT (PARCEL 8) \ \ `~• CATCH BASINS CB-B RIM = 81. 19 CB-C RIM = $2. 41 CB-D RIM = 82.42 CB-E RIM = 85.50 STORM DRAIN MANHOLES SDMH RIM = 81. 15 SDMH-B RIM = 81.39 SDMH-C RIM = 81.77 S -D RIM = 81,74 SDMH-E RIM = 82. 86 SDMH-F" RIM = 83.40 SEWER MANHOLES SSMH-l- RIM = 82.79 12' ADS S = 76, 79 6" CONC S = 81, 21 12' CONC NE = 76.59 4" COW SW = 84. 00 le' PVC N = 76,42 12" PVC . W = 76.42 8" PVC SW = 81.94 12" PVC S = 77.43 12* PVC E = 74. 91 12' PVC NE = 76,54 PLUG 30" COK S = 76,41 30" CONIC NEE = 76.41 12" CONC SW = 77.89 24' CONIC S = 76,77 24' CONC N = 76. #e 3 ' CONC SW - 76,54 CONIC N = 76,54 24' CONC SE = 76.59 30" COK N = 76.43 X Y CONC S = 76, 41 12' ADS W = 77.21 12' ADS E = 77,03 12" ADS N = 78.27 12' ADS E = 78.15 12" ADS S = 78•:30 18" COIF S = 78, 71 18" CONC N = 78.61 00 \ \ �'- `' • .=! �• WATER CB#2, TYPE , \ SITE BENCHMARK 13. vALVEs .. \ ;� TOP SE BOLT TE=84.53 c5"' '`�.. V�. \ ACK OF `' ••. ,r HYDRANT- �%' `� IE - 82.33 \ \ ' • 'Y � \ FUTURE WALK E L E V = H J� . '�' 7 ' �J J \ \ PROPERTY �� `ti' ACQUISITION (SEE NOTE 3) ~ EN a -!V`CU 7BM I I L.Li �� EXST PC OF MONUMENT ° \ \ -SIGN - - - - - - - ._... - -WATER W VALYE LkRE LiJ M0 ITORING I T.T °- CABLE WEL' S I \, J-BOXFF hL�{� r .... 00 I (-----I-i___---- J .n t' •• I I I I i I � I 1 I i Cw INLET#3 / TE-87.41(MATCH EXST GRADE) I MONITORING .. IE=ft21 WELL I SSCO VACATED 4th STREET SE (ORD. NO 16Q8) 12"\FORCE MAIN _ cA .• A a I .�� DUMPST " I INL.E T02 / i TE=82.25 t i IE= 79.75 t -\v TUBLX I\ I \ t I I \ / 1 1 AIR MARKS O 30' XXC., TYP I / f I 1 l • i t / 84LF- 8"L6PE / 00. 79X r I I 1 311 I THREE CART%�E I TREATMENT I TOP SLAB82.31 IE= 71.01(ALL) (SEE DETAIL.) I I I I I � I I IE = 77.12(NE W 8") IE- 75. 78(E XST) i I (VERIFY) I i I w I I SDMH-D i USE EXST 1" WM FOR PROPOSED (Rf•Y E) PLACE TRAFFIC RATED BOX IF REQUOU. -SSMH-809-65 AK CUT "C" CURB AS PgWER / (NOT SURVEYED) / \ REQUIRED TO ALLOW v ULT5 tNORSTRUCTED ACCESS 00 SDMH-B �/ �� �\ DMH--C VVAULT P I INLET#1��f IN I P(UG) GUY / 114"0 CONIC W TER WIRE ' v AUSI j CAP V LVE `�LLJ cc �\ -- --_� -_ ° �__ t17 _____- d -� _ � 0-d w PARKING a J-BOX- UTILITY POWER I �� N POLE CABINEtS SDMH-A � 50' 1/2 R/W CVW PLACE ANO EST EDGE OF EXST ;FT TURN LANE. :RIFY LOC. SEE 22' (VERIFY, SEE NO ) PROPOSE BLDG FF= 84.5 17LF-8"LCPE 00.50X SAWC,'UT AT NEAREST , --- CB-B I i MONITORING WELL `-i LE F III TLC BEOR "C" CURB ' IN LINE NATH SEE NO'!E = _ - - - SWT14 PA I I I I I I I I EXISTING TOPOGRAPHY NOTE: VERIFY EXISTING TOPOGRAPHY IN AREA OF PROPOSED CONSTRUCTION PRIOR TO ANY WORK. NOTIFY ENGINEER IF CONFLICTS ARE IDENTIFIE0. EXISTING UTILITY DOTE: VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES (WHETHER OR NOT SHOWN) IN POTENTIAL.. CONFLICT W/ PROPOSED CONSTRUCTION PRICK TO ANY WORK, SIDE SEWFER DOTE: LOCATE EXISTl G SIDE SEWER PRIOR TO CONSTRUCT" OF NEW SIDE SEWER. REMOVE OR ABANDON PER C.O.A. REQUIREMENTS. "C" CURB AND NO LEFT TURN SIGN NOTES: VERIFY "C" CURB LENGTH AND LOCATION WITH C.O.A. TRAFFIC ENGINEER PRIOR TO ANY WORK. NO LEFT TURN SMALL COMPLY NTH MUTCD R3-2, 24"x24". StGN CONSTRUCTION AND PLACEMENT SHALL BE PER CITY OF AUBURN REQUIREMENTS. VERIFY SIGN LOCATIONS WITH C.O.A. TRAFFIC ENGINEER PRIOR TO ANY WORK. RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO TH'E CONTRACTOR'S CONSTRUCTION RECORDS BY: NOTE: TITLE/POSITION: CONFIRMED BY CITY: PROJECT REF: 4-0443 THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN'S ENGINEERING DIVISION REQUIREMENTS APPROVED BY: LzaaA DATE APPROVED: EXPIRES 5/14 - SITE ADDRESS: L(%a) d l-swr 407 Auburn Way South 0 Cross St SE 12/20/04 REVISED PER CITY CO>M TS & MYLARS MATM 12/4/04 RE PER CITY COMMENTS 10/14/04 REVISED PER CITY COMMENTS BIGFOOT JAVA o-,m, AUBURN DATE: 9/7/04 DES: JK & DCD SCALE: 1 "=2D' DWN: JK DRAINAGE PLAN TRIMARK PETROLEUM GROUP LLC (CONTACT: AL JIWANI) 406 ELLINGSON ROAD #1000 At of 0 PACIFIC, WA 98047 SW 1/4, SEC 18, TWP 21 N, RGE 5 E, WM SQUARE ACCESS CONCREI COLLA (SEE NOTE E UNDERI MAN (SEE NOTE 5) 3-CART. CATCHBASIN - PLAN VIEW SCALE: N.T.S. CLEAN OUT OUTSIDE\_ 12" 0 OUTLET PIPE ACCESS PLUG (SEE NOTE 5) 3—CART. CATCHBASIN — SECTION VIEW A —A SCALE: N.T.S. RECTANGULAR 3/8" )RMFILTER RTRIDGE P) THE STORMWATER MANAGEMENT StormFilter U.S. PATENT No. 5,322,629, No, 6,707,527, No. 6,027,639, No, 5,624,576, AND OTHER U.S. AND FOREIGN PATENTS PENDING SHEET DATE 15Y IREVISION Al DEEP STEEL CATCHBASIN STORMFILTER 1139 PLAN AND SECTION VIEW Ar VAA ANDARD DRAWING - 3-CARTRIDGE UNIT STORMWATER PROJECT NO.: DRAWING FILE NAME: MANAGEMENT I N C , PSI]PO8Y: JHL DRAWN BY �NRp4 XXXX CBSF-3-SD.DWG (800)5484667NOMINEE JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. NOTE: FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE 2"x2" BY 14 Ga. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED FILTER FABRIC MINIMUM 4"x4" TRENCH BACKFILL TRENCH WITH NATIVE SOIL OR 3/4"-1.5" WASHED GRAVEL K4" WOOD POSTS, STEEL FENCE POSTS, REBAR, OR EQUIVALENT SILT FENCE NTS z N z N 1/2" 3 /8" OVERLAP a PERMANENT POOL ELEVATION INLET STUE (OPTIONAL; SQUARE INLET GRATE ACCESS COVER / ONE REINFORCING BARS (SEE NOTE 6) TER 1 1 /2" 1 1 /2" 1 2 5/8" INSIDE RIM INSIDE RIM I INSIDE RIM 5 3/4" OUTSIDE RIM 3-CART. CATCHBASIN - TOP VIEW SCALE: N.T.S. 3—CART. CATCHBASIN — SECTION VIEW SCALE: N.T.S. 8" 2 1 /4" 0 OUTLET STUB NOTE 5) OUTLET PIPE FROM UNDERDRAIN LIFTING EYE (TYP OF 4) CARTRID SUPPOI RECTANGULAR ACCESS COVER a 1 1 /2" INSIDE RIM 3—CART. CATCHBASIN - SECTION VIEW SCALE: N.T.S. THE STORMWATER MANAGEMENT StormFilter U.S. PATENT No. 5,322,629, No. 5,707,527, No. 6,027,639, No. 5,624,576, AND OTHER U.S. AND FOREIGN PATENTS PENDING SHEET VISION DEEP STEEL CATCHBASIN STORMFILTER xxx TOP AND SECTION VIEW 2/3 STANDARD DRAWING �- 3-CARTRIDGE UNIT MESIGNEDBY:.i" STORMWATER 2ATE: MANAGEMENT / N C . PROJECT NO.: DRAWING FILE NAME: DRAWN BY: 1 13 04 XXXX CBSF-3-SD.DWG (800)548-4667 Rp Pp R = 15' MIN.'' �rC INSTALL DRIVEWAY CULVERT IF THERE ` IS AROADSIDE DITCH PRESENT, AS PER CITY OF AUBURN ROAD STANDARDS 4"-8" QUARRY SPALLS GEOTEXTILE- 12" MIN. THICKNESS AS PER CITY OF AUBURN ROAD STANDARDS, DRIVEWAYS SHALL BE PAVED TO THE EDGE OF R—O—W PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA CONSTRUCTION ENTRANCE NTS SOLID WALLS FILTER MEDIA FOR DEWATERING GENERAL NOTES 1.) STORMFILTER BY STORMWATER MANAGEMENT INC., PORTLAND, OREGON 800/548-4667. 2.) FILTERS TO BE SIPHON —ACTUATED AND SELF—CLEANING. 3.) STEEL STRUCTURE TO BE MANUFACTURED OF Y4" STEEL PLATE. 4.) STORMFILTER REQUIRES 3.3' OF DROP FROM RIM TO OUTLET. INLET (IF APPLICABLE) AND OUTLET PIPING TO BE SPECIFIED BY ENGINEER AND PROVIDED BY CONTRACTOR. 5.) CBSF EQUIPPED WITH 4" LONG STUBS FOR INLET (IF APPLICABLE) AND OUTLET PIPING. STANDARD OUTLET STUB IS 12" IN DIAMETER. CONNECTION TO COLLECTION PIPING CAN BE MADE USING FLEXIBLE COUPLING BY CONTRACTOR. 6.) FOR H-20 LOAD RATING, CONCRETE COLLAR IS REQUIRED. CONCRETE COLLAR WITH QUANTITY (2) #4 REINFORCING BARS TO BE PROVIDED BY THE CONTRACTOR. 7.) ALL STORMFILTERS REQUIRE REGULAR MAINTENANCE. REFER TO OPERATION AND MAINTENANCE GUIDELINES FOR DETAILS, 8.) STANDARD DETAIL SHOWS MAXIMUM NUMBER OF CARTRIDGES. EXACT NUMBER REQUIRED TO BE SPECIFIED ON SITE PLANS. SHEET DATE BY REVISION UUjUjjjAjWjXAA 3/3 ..r.. ESIGNED BY: .j" DRAWN BY: CATCH BASIN GRATE — OVERFLOW- I i- - 1= — POROUS BOTTOM 3-CARTRIDGE DEEP CATCHBASIN STORMFILTER DATA DESIGN WATER QUALITY FLOW RATE (cfs) XXX PEAK FLOW RATE cfs) XXX RETURN PERIOD OF PEAK FLOW ( rs) XXX # OF CARTRIDGES REQUIRED XX CARTRIDGE FLOW RATE (15 GPM STD) XX MEDIA TYPE XXXXX RIM ELEVATION (CHECK: RIM — IE—OUT = 3.31) I.E. DIAMETER INLET STUB XXX XXX OUTLET STUB XXX XXX CIRCLE CONFIGURATION: OUTLET 011 INLET OUTLET INLET NOTES SPECIAL REQUIREMENTS: THE STORMWATER MMINAGEMENT StormFilter U.S. PATENT No. 5,322,629, No. 5,707,527, No. 6,027,639, No. 5,624,576, AND OTHER U.S. AND FOREIGN PATENTS PENDING DEEP STEEL CATCHBASIN STORWXnW NOTES AND DATA BLOCK STANDARD DRAWING - 3-CARTRIOGE UNIT STORMWATER PROJECT NO.: DRAWING FILE NAM7: MAN A O E M E N T IN*. 13.04 XXXX CBSF-3-SD.DWG L (800)548-4667 NOTE: THIS DETAIL IS ONLY SCHEMATIC, ANY INSERT IS ALLOWED THAT HAS A MIN. 0.5 C.F. OF STORAGE, THE MEANS TO DEWATER THE STORED SEDIMENT, AN OVERFLOW, AND CAN BE EASILY MAINTAINED. TES C CATCH BASIN INSERT NTS SITE ADDRESS: 407 Auburn Way South @ Cross St SE DOU 4 O •�F •W A Sys c •' 1 182 IONA EXPIRES+ 5/ 14/� S pF 11 133 SHEET S or- osD /817' W