Loading...
HomeMy WebLinkAbout02D16540 0 tU 0 m .-a LO 0 .o CM 3t 0 a u n Qi CT► t` 0 C3, (31 L a U) SE 1/4 OF SECTION 31, TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. LAKELAI`ID 1tiiORTH Dill. '� 2, PHASE GRADING & UTILITY PLAN OWNER/DEVELOPER : MPL CHUCK I Now 4120 187TH AVENUE S.E. ISSAQUAH. WA. 98027 PHONE: (425) 401-0791 CIVIL ENGINEER PACIFIC ENGINEERING DESICK INC" 48W S. 188TH ST., SUITE 360 SEATTLE, WA. 98188 PHONE (206) 431-7970 FAX (206) 431-7975 THAT PORTION OF THE NORTH HALF OF THE SOUTHEAST QUARTER OF SECTION 31, TOWNSHIP 21 NORTH, RANGE 5 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY,WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST 1 /16 CORNER OF SAID SECTION; THENCE SOUTH 00"49'54" WEST ALONG THE EAST 1/16 LINE OF SECTION 31, A DISTANCE OF 1,304.90 FEET TO THE C—E1/16 CORNER OF SECTION 31; THENCE SOUTH 89037'22" EAST ALONG THE E—W CENTER 1/41LINE OF SECTION 31, A DISTANCE OF 85.00 FEET TO A POINT ON THE E—W CENTER 1 4 LINE OF SECTION 31, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF THE PLAT OF LAKELAND DIVISION NO.12, PHASE I, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 177 OF PLATS, PAGES 20 THROUGH 25, INCLUSIVE, IN KING COUNTY, WASHINGTON; THENCE SOUTH 12`2238" WEST ALONG THE EAST LINE OF SAID PUT OF LAKELAND DIVISION NO.12, PHASE I FOR A DISTANCE OF 121.15 FEET; THENCE NORTH 84'37'22" WEST A DISTANCE OF 254.99 FEET TO A POINT; THENCE SOUTH 05"22'28" WEST A DISTANCE OF 50.00 FEET TO A POINT ON THE SOUTHERLY MARGIN OF 51ST STREET SOUTHEAST AND A POINT OF CURVATURE A CURVE CONCAVE SOUTHWESTERLY TO A RADIUS POINT OF WHICH BEARS SOUTH 05"22'38" WEST 450.00 FEET TO A POINT; THENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE TO THE LEFT OF 07"22'36" FOR AN ARC DISTANCE OF 57.94 FEET TO THE TRUE POINT OF BEGIMING; 7HENCE ALONG SAID CURVE THROUGH A CENTRAL ANGLE TO THE LEFT OF 47VZ34" FOR AN ARC DISTANCE OF 369.47 FEET TO A POINT OFT T; THENCE NTH 4017'2W WEST A DISTANCE OF 148.96 FEET TO A POINT; THENCE SOUTH 50'40'18" EAST A DISTANCE OF 143.82 FEET TO A POINT; THENCE NORTH 44M2'04" EAST A DISTANCE OF 203.64 FEET TO A POINT; THENCE NORTH 67'02'11" EAST A DISTANCE OF 156.33 FEET TO THE SOUTHWEST CORNER OF SAID PLAT OF CORNER OF LAKELAND DIVISION #12, PHASE I; THENCE ALONG THE WEST LINE OF SAID PLAT NORTH 05"22'38" EAST A DISTANCE OF 161.94 FEET TO THE TRUE POINT OF BEGINNING. SHEET C1 COVER SHEET/ COMPOSITE UTILITIES SHEET C2 GENERAL NOTES SHEET C3 PLAT MAP SHEET C4 GRADING do DRAINAGE/T.E.S.C. PLAN SHEET C5 WATER do SANITARY SEWER PLAN SHEET C6 CROSS SECTIONS do DETAILS SHEET C7 TREE PLANTING PLAN & DETAILS REVISIONS: REVISED PER C.O.A. REVIEW COMMENTS 10-10-00 TLR Pr 035- ( of 1 NEW DUAL WATER SERVICE(LOT2&3) AUBURN, WA. NEW SINGLE WATER SERVICE(LOT1) NEW CATCHBASIN rF i� � •t.. ,,,.ig 40 F f W 1 H 1 h } N.•. - r r r f y L ik u dr 'i I' k LOT1 ; s} W � _ LOT2 LOT TRACT "A" IN.._ 12 dp 7- / J ? J T51 . i ,' DIVI SOON 5B 16 1-7. SCALE: P' - 60' N A r \� 312105-9022 � EARTHWORK ESTIMATE NET 2,500 C.Y. CUT ZONING R2 DATUM (NGVD 29) City of Auburn CA C1^C1 All IL Ii=0 • ALGONA!r /EUJNGWN -• i { PACIFIC KING r-r,A l.w {f j. COUNTY f ' + 1✓ . fig a • • I�yl PIERCE C"TY . IIO w PIERCE COUNTY 31—R 31—S—% S.I�Jsll l✓\✓� fF CITY BENCHMARKS 31—P BRASS SURFACE MONUMENT AT THE CENTERLINE OF MILL POND DR. AT 50th PLACE SE, 298.97 (FEET) 91.13 (METERS) 31—Q BRASS SURFACE MONUMENT AT THE CENTERLINE OF MILL POND DR. AT Slot STREET SE, 368.23 (FEET) 111.63 (METERS) 31—R BRASS SURFACE MONUMENT AT THE CENTERLINE OF MILL POND DR. AT 52nd PLACE SE, 393.30 (FEET) 119.88 (METERS) 31—S BRASS SURFACE MONUMENT AT THE CENTERLINE OF MILL POND DR. AT 53rd PLACE SE, 409.57 (FEET) 124.84 (METERS) Record Drawing Certification These drawings conform to the Contractor's c truction cords. D a t 2-zz- Title/Position: Sv�� Confirmed by City. Date: PROJECT REF: FAC NO. 00-0028 U/ These plans are approved for conformance with 7 the City of Auburn's Engineering Division requirements Approved By: Date Approved: �i [__ " i RE D PER CITY REVIEW COMMENTS 0 1 MTL PACIFIc ESIGN NON np. t. Ay/yF�P 18612 slE IZ- NA L EXPIRES: MAY 6.._2001 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 02-05-01 SHEET REVISION C1 CIVIL ENGINEERING AND PLANNING CONSULTANTS 0 0 m LD cu o, 3 0 z Q, a, CD 0, (T) a L d IV Cn 73 GENERAL CONSTRUCT ION NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF AUBURN'S REQUIREMENTS AND SPECIFICATIONS. 2. ALL WORK SHALL CONFORM TO THESE DRAWINGS AND THE RULES AND REGULATIONS OF THE "WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT/APWA) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION" LATEST EDITION, EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY OF AUBURN STANDARD DETAILS AND DEVELOPMENT PROJECT SPECIFICATIONS. 3. THE CONTRACTOR IS REQUIRED TO HAVE A COPY OF CITY OF AUBURN STANDARD CONSTRUCTION NOTES, DETAILS AND SPECIFICATIONS AVAILABLE AT THE JOB SITE ALONG WITH A COPY OF THE APPROVED DEVELOPMENT PLANS. 4. A PRE -CONSTRUCTION MEETING SHALL BE REQUIRED PRIOR TO ANY ON -SITE WORK FOR ALL PUBLIC FACILITY EXTENSION PROJECTS. 5. LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROXIMATE. IDENTIFICATION, LOCATION MARKING AND RESPONSIBILITY FOR UNDERGROUND FACILITIES OR UTILITIES IS GOVERNED BY THE PROVISIONS OF CHAPTER 19.122 REVISED CODE OF WASHINGTON. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE -CALL (1-800-424-5555) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE AND TELEVISION). 6. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD ELECTRICAL LINES ARE NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD ELECTRICAL POWER IN ALL AREAS AND SHALL FOLLOW PROCEDURES DURING CONSTRUCTION AS REQUIRED BY LAW AND REGULATION. 7. TRAFFIC CONTROL AND STREET MAINTENANCE FOR SAFETY OF THE TRAVELING PUBLIC ON THIS PROJECT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND ALL. METHODS AND EQUIPMENT USED WILL BE SUBJECT TO THE APPROVAL OF THE CITY OF AUBURN. CONTRACTORS AND THEIR SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM. 8. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE REQUIRED TO CONTROL ON - SITE STORM WATER RUNOFF BY USING TEMPORARY OR PERMANENT DRAINAGE EROSION/SILTATION CONTROL PROCEDURES. 9. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL UNDERGROUND UTILITIES. 10. EXISTING PAVEMENT SURFACES SHALL BE SAW CUT FULL DEPTH WITH STRAIGHT, UNIFORM EDGES 12 INCHES (12") OUT FROM THE EDGE OF EXCAVATION, ALL JOINTS BETWEEN THE NEW AND ORIGINAL PAVEMENT SHALL BE PAINTED WITH ASPHALT EMULSION (CSS-1). 11. TIME LIMIT RESTRICTIONS�yITHIN EXISTING RIGHTS -OF -WAY WILL BE APPLICABLE AND DETERMINED AT THE PRE -CONSTRUCTION MEETING. 12. THE CONTRACTOR SHALL INSTALL, REPLACE, OR RELOCATE ALL SIGNS, AS SHOWN ON THE PLANS OR AS AFFECTED BY CONSTRUCTION, PER THE CI TY'S STANDARD DETAIL NO. TRSP-1. 13. POWER, CABLE AND TELEPHONE LINES SHALL BE IN A TRENCH WITH A AM?NIUM HORIZONTAL SEPARATION FROM OTHER UTILITIES (SEWER, WATER, STORM) OF FIVE FEET (5'). 14. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL DE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER. 15. THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO REDUCE EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL ALSO SWEEP ALL AFFECTED PUBLIC ROADS, AS NECESSARY, TO REMOVE MUD DEPOSITED AS A RESULT OF PROJECT CONSTRUCTION ACTIVITY. 16. CERTIFIED DRAWINGS ARE REQUIRED PRIOR TO PROJECT ACCEPTANCE. REFER TO THE CI TY'S "RECORD CONSTRUCTION DRAWINGS" REQUIREMENT. 17. FOR MANHOLE AND CATCH BASIN RIM ADJUSTMENT, MAXIMUM ADJUSTMENT WITH BRICK OF RIMS AND CASTINGS SHALL BE 14 INCHES (14") WITHOUT ADDING NEW SECTIONS. 18. ALL MANHOLES, CATCH BASINS, AND VALVES IN PUBLIC RIGHTS -OF WAY OR EASEMENTS SHALL BE ADJUSTED AFTER ASPHALT PAVING, AND CONFORM TO THE CI TY'S STANDARD ADJUSTMENT DETAIL NO. STFG-1. ALL UTILITY CASTINGS OUTSIDE OF PAVED AREAS SHALL BE INSTALLED WITH A CONCRETE COLLAR AROUND THEM. 19. PVC MANHOLE ADAPTERS OR APPROVED EQUAL SHALL BE USED TO MAKE ALL CONNECTIONS OF SDR 21 OR 35 PVC PIPE TO MANHOLES OR CATCH BASINS. 20. THE MAXIMUM LAYING LENGTHS SHALL NOT EXCEED 12'6" FOR SDR 21 OR 35 PIPE. 21, BEDDING FOR PVC, CONCRETE AND DUCTILE IRON PIPE SHALL BE 518 INCH MINUS CRUSHED ROCK, SIX INCHES (6") MINIMUM UNDER, TO SIX INCHES (6") MINIMUM OVER THE PIPE, AS PER THE CITY OF AUBURN STANDARD DETAIL NO. GEPT-2. 22. REFER TO AUBURN STANDARD TRENCH EXCAVATION AND BACK FILL DETAIL NOS. GEPT-1 AND GEPT-2 FOR CONSTRUCTION PROCEDURES. 23. ALL IMPORTED PIPE TRENCH BACK FILL MATERIAL SHALL BE BANK RUN GRAVEL, FOR TRENCH BACK FILL PER SECTION 9-03.14. 24. PIPE TRENCH BACK FILL MATERIAL WITHIN THE IMPROVED RIGHT -OF WAY SHALL BE 518 INCH MINUS CRUSHED ROCK WHEN CONNECTION IS PERPENDICULAR TO THE CITY STREET, AS PER CITY OF AUBURN STANDARD DETAIL GEPT-1. 25. CONSTRUCTION OF PROPOSED IMPROVEMENTS SHALL BE IN ACCORDANCE WITH APPROVED PLANS. ANY CHANGES FROM THE APPROVED PLAN WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER AND THE CITY OF AUBURN. REVISIONS: PF35 ? off GRADING AND EROSION CONTROL NOTES 1. WITHIN THE CITY OF AUBURN, ALL REQUIRED RETENTION OR DETENTION, SEDIMENTATION AND EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION, PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION ACTIVITIES, TO INSURE THAT SEDIMENT -LADEN WATER AND STORM DRAINAGE RUNOFF DOES NOT IMPACT THE ADJACENT PROPERTIES OR THE NATURAL DRAINAGE WAYS. 2. THE DETENTION, SEDIMENTATION (RETENTION IF INFILTRATION SYSTEM IS USED) AND EROSION CONTROL FACILITIES DEPICTED ON THE APPROVED DRAWINGS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL DRAINAGE AND EROSION CONTROL FACILITIES MAY BE REQUIRED AS SITUATIONS WARRANT DURING CONSTRUCTION. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO THESE CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMI TTEE. 3. THE DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED) CONTROL POND SHALL REMAIN IN PLACE UNTIL THE PERMANENT STORM SYSTEM IS IN PLACE AND OPERATIONAL. 4. THE TEMPORARY EROSION CONTROL FACILITIES, INCLUDING ALL PERIMETER CONTROLS, SHALL REMAIN IN PLACE UNTIL FINAL SITE CONSTRUCTION IS COMPLETED AND APPROVAL HAS BEEN RECEIVED FROM THE CI TY. 5. ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION AND SEDIMENTATION IMPACTS ON ADJACENT PROPERTY AND DRAINAGE WAYS MUST BE STABILIZED ACCORDING TO THE FOLLOWING SCHEDULE, FROM APRIL 1 TO SEPTEMBER 30, AREAS AT FINAL GRADE AND THOSE WHICH ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN 30 DAYS, SHALL BE STABILIZED WITHIN 10 DAYS. FROM OCTOBER 1 TO MARCH 31, EARTHWORK ACTIVITIES SHALL BE CONDUCTED IN STAGES IN ORDER TO MINIMIZE SOIL EXPOSURE. EXPOSED SOILS WITH AN AREA GREATER THAN 5,000 SQUARE FEET THAT ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN 24 HOURS AND EXPOSED AREAS OF LESS THAN 5,000 SQUARE FEET THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS SHALL BE STABILIZED IMMEDIATELY. STORM SEWER CM77WTM NOTES 1. THE CONTRACTOR SHALL OBTAIN ANY NECESSARY STORM LINE CONNECTION PERMITS FROM THE CITY OF AUBURN PRIOR TO CONSTRUCTION, 2. ALL STORM DRAINS WITHIN THE DEVELOPMENT SHALL HAVE STENCILED "DUMP NO WASTE - DRAINS TO "EITHER" STREAMS, "WETLANDS," OR "GROUNDWATER" AS APPLICABLE. SANITARY SEWER CONSTRUCTION NOTES 1. THE LOCATION OF THE SIDE SEWERS SHALL BE MARKED AT THE END OF THE LINE INSIDE PROPERTY BY A PRESSURE TREATED 2 X 4, FOUR FEET (4") LONG BURIED IN THE GROUND A DISTANCE OF THREE FEET (3'). THE LOWER END SHALL HAVE A 2 X 4 CLEAT NAILED TO IT TO PREVENT WITHDRAWAL OF THE STAKE. THE EXPOSED ONE FOOT (1) SHALL BE PAINTED TRAFFIC YELLOW AND THE DEPTH TO THE SIDE SEWER OR TEE SHALL BE INDICATED IN BLACK PAINT ON THE 2 X 4. 2. CONTRACTOR SHALL OBTAIN ANY NECESSARY SIDE SEWER CONNECTION PERMITS FROM THE CITY OF AUBURN PRIOR TO CONSTRUCTION. 11. ALL WATER MAINS SHALL HAVE A BLOW -OFF ASSEMBLY AT LOW POINT AND AN AIR VACUUM RELIEF VALVE AT HIGH POINT OF MAIN. SEE STANDARD DETAILS WAAR-1 AND WABO-1. 12. THE FIRE HYDRANT ASSEMBLIES SHALL CONFORM TO STANDARD DETAIL WAFH-1 AND SHALL STAND PLUMB. SET TO FINISHED GRADE WITH THE LOWEST OUTLET BEING NO LESS THAN 18 INCHES (18") FROM FINISHED GRADE AND A CLEAR ZONE AROUND HYDRANT OF NO LESS THAN 36 INCHES (36'). THE PUMPER PORT SHALL FACE STREET OR FIRE ACCESS. 13. ALL VALVE BOXES IN PUBLIC RIGHTS -OF WAY OR EASEMENTS SHALL BE ADJUSTED TO FINAL GRADE AFTER FINAL PAVING IS COMPLETE IN ACCORDANCE WITH THE CITY OF AUBURN'S STANDARD DETAIL NO. STFG-1. 14. BACK FLOW DEVICES REQUIRED WITH FIRE PROTECTION AND IRRIGATION SYSTEMS, AND TO BE INSTALLED PER THE CITY OF AUBURN'S DETAILS. 15. THE UNDERGROUND FIRE SPRINKLER SYSTEM SHALL BE APPROVED BY THE FIRE MARSHAL AND INSTALLED BY A STATE LICENSED FIRE SPRINKLER CONTRACTOR. 16. STREET OR PARKING LOT CURBS SHALL BE PAINTED WITH FORMULA WID-Y1 (YELLOW) 15 FEET (15') EACH SIDE OF ALL FIRE HYDRANTS, AS DIRECTED BY THE CITY. CONSTRUCTION SEQUENCE 1. ARRANGE AND ATTEND PRE -CONSTRUCTION MEETING WITH THE CITY OF AUBURN. 2. ESTABLISH AND SUBMIT PROPOSED HAUL ROUTE TO THE CITY. 3. FLAG LIMITS OF CLEARING AND GRADING. 4. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE. 5. INSTALL PERIMETER SILT FENCING. REMOVE ALL TREES WITHIN THE LIMITS OF CLEARING. 6. ROUGH GRADE SITE. ENSURE THAT ALL AREAS OF ACTIVE EARTHWORK ARE CONTAINED TO PREVENT UNCONTROLLED DISCHARGE OF STORM DRAINAGE. 7. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN 7 DAYS DURING THE DRY SEASON AND 2 DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT. 8. HYDROSEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 9. INSTALL SANITARY SEWER SERVICES. 10. INSTALL STORM SYSTEM DRAINAGE SYSTEM. PROVIDE INTERIM SEDIMENT PROTECTION FOR ALL INLETS (PROPOSED AND EXISTING) WITHIN OR SUBJECT TO FLOWS FROM THE GENERAL WORK AREA. 11. INSTALL WATER SERVICES & METERS. 12. INSTALL REMAINDER OF UTILITIES, STREET LIGHTING, POWER, GAS, CABLE, ETC. 13. FINAL GRADE ACCESS DRIVE AND LOTS. INSTALL DRIVEWAY APRON AT 51ST: 3. UNLESS OTHERWISE APPROVED, THE CITY OF AUBURN SHALL DO ALL 14. BEGIN LOT CONSTRUCTION. MAINTAIN EROSION CONTROL THROUGHOUT LOT CONNECTIONS TO EXISTING SEWER MAIN WITH NEW TEES. THE CONTRACTOR CONSTRUCTION. HYDROSEED OR SOD DISTURBED AREAS AS INDIVIDUAL LOTS ARE SHALL BE RESPONSIBLE FOR TRENCH AND PAVEMENT EXCAVATION PIPE FINISHED. INSTALLATION, BACKFILL AND PAVEMENT RESTORATION. WATER MAIN CONSTRUCTION NOTES 15. PAVE ACCESS DRIVE ONCE LOT CONSTRUCTION HAS BEEN COMPLETED. HYDROSEED OR SOD ANY REMAINING AREAS OF DISTURBANCE. LANDSCAPE IMMEDIATELY. PLANT 1. PIPE FOR WATER MAINS SHALL BE DUCTILE IRON MEETING ANSI SPECIFICATIONS STREET TREES. A- 21.51 OF LATEST REVISIONS AND SHALL BE THICKNESS CLASS 52. PIPE SHALL BE CEMENT -LINED, IN ACCORDANCE WITH ANSI SPECIFICATION A-21.4 OF 16. CLEAN STORM DRAINAGE SYSTEM. LATEST REVISION. 17. REMOVE REMAINING EROSION CONTROL MEASURES FOLLOWING THOROUGH CLEANING 2. ALL PUBLIC WATER MAINS SHALL HAVE A MINIMUM COVER OF FORTY-TWO INCHES OF ALL PAVED AREAS AND ONLY WITH APPROVAL FROM THE CITY INSPECTOR. 3. ALL VALVES FOR WATER MAINS SHALL BE RESILIENT WEDGE GATE VALVES FOR TWELVE -INCH (12") AND SMALLER. BUTTERFLY VALVES SHALL BE USED WHEN OVER TWELVE -INCH (12'). 4. JOINTS, EXCEPT WHERE OTHERWISE REQUIRED OR SHOWN ON THE DRAWINGS, SHALL BE EITHER MECHANICAL -BOLTED TYPE, OR PUSH -ON RUBBER RING GASKET TYPE, CONFORMING TO AMERICAN NATIONAL STANDARD A-21.11. 5. PIPE FITTINGS SHALL BE DUCTILE IRON AND SHALL HAVE THE SAME KIND OF COATING, LINING AND STRENGTH AS THE PIPE TO WHICH CONNECTED AND SHALL CONFORM TO ANSI SPECIFICATIONS A-21.10 AND A-21.11 OF LATEST REVISION. 6. HYDROSTATIC TESTS ON THE NEW PIPE LINE SHALL BE MADE IN ACCORDANCE WITH THE PROCEDURE FOR WATER -PRESSURE TESTING WATER MAINS AND THE LATEST PROVISIONS OF AWWA C 600, EXCEPT AS MODIFIED HEREIN. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT NECESSARY TO MAKE THE TEST, AND THE CONTRACTOR SHALL CONDUCT ALL TESTS UNDER THE SUPERVISION OF THE ENGINEER. PRESSURE TESTS SHALL BE MADE ON ALL PIPING AND APPURTENANCES INSTALLED UNDER THIS CONTRACT, INCLUDING ALL CONNECTIONS TO EXISTING MAINS AT A MINIMUM TEST PRESSURE OF 200 PSI. 7. DISINFECTION OF THE NEW WATER SYSTEM SHALL BE REQUIRED PRIOR TO CONNECTION TO THE EXISTING WATER MAINS AND SHALL BE IN ACCORDANCE WITH THE LATEST PROVISIONS OF AWWA C 601. 8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY WATER SERVICE CONNECTION PERMITS FROM THE CITY OF AUBURN PRIOR TO CONSTRUCTION. 9. INSTALLATION OF CORPORATE STOPS, WATER SERVICE, LINES AND METERS SHALL BE PER CITY OF AUBURN STANDARD DETAILS NUMBERS WASM 1,2,3 AND 5. SERVICES SHALL BE A MINIMUM 314 INCH. THE CITY OF AUBURN WILL INSTALL THE METERS. 10. RESTRAINED JOINTS SHALL BE USED AT ALL BENDS. FOR TEES, 90? BENDS, AND SPECIAL CIRCUMSTANCES, CONCRETE BLOCKING SHALL ALSO BE USED. SEE STANDARD DETAIL WABL-1. PACIFIc ENOINEERINGi [:)ESION INCO' Record Drawing Certification These drawings conform to the Contractor's construction records. By. Date: =-z1z- oZ Title/Position: s'v�•ie�yo/ Confirmed by City: Date. PROJECT REF: FAC NO. 00-0028 These plans are approved for conformancd with the City of Auburn's Engineering Division requirements 5.4 Approved By, Date Approved: EXPIRES: MAY 6, 2001 J Q � W FW- W Z Q Q 3 Z D Q rWn VJ Q I w N ♦- Z O r� Y/ D WnO� 0) 0 0 W a9 O Z W Z W Q3N V J ��W �0Z W N0)o IL Q J 99-71 PROJECT NO. TLR DRAWN BY 07- 21- 00 ISSUE DATE 10-10-00 SHEET REVISION C 2 0 N rn r I K) �t 0 N w z O a 00 00 00 rn 0 w V) E z I- 00 00 vi 0 0 00 It CIVIL ENGINEERING AND PLANNING CONSULTANTS .l SE 1/4 OF SECTION 31 ,TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. 51 ST STREET S.E. GRAPHIC SCALE 30 0 is 30 so 9+00 10+00 5*00 1 A=47*0 2'3 4!' R=450. 001 L -81. 7 7 --,369-47- 11.1-00 G.S. z 1`10 1 Cj 4M 21n q6 1 6* 7 62-33' 7 0.0 .7 �� I.. , r Y, 64-00 Q, LOT 1 -1 -----11. 2850-SF 6*60 LOT 2 10 E 10274 SF M .00'DRAi GE tK 0A00 EASEME — — — — — — — — - �k A C� CP LOT 3 r& 33530 SF, / 0 5 7 CPS 101 9 DIVISION 12-,,,- 74 TRACT "Am P. - (AREA-14273 SF) N6 7-0 - CP 2#11 *# E - # 8 1 156-33 Ile 5.00' BLOG". do 95-29 SETBACK 93 � EX.8,5,60'POWER 0 61-05 7- 'F-ASEMENf 0. .00 WASION 5MI, 13 14 15 12 -I-A-c=�37-07'41 DIVISION 5B R=4aoo' L=25.62 N, REVISIONS: REVISED PER C.O.A. REVIEW COMMENTS 10-10-00 TLR o PACIFIC ENGINEERING DESIGN INC. A 4q ( IN FEET ) I inch - 30 ft 1 12 IONA0j S T 111F L EXPIRES: MAY 6, 2001 Record Drawing Certification These drawings conform to the Contractor's Structlo ecords. B Da z-a2-oZ Title/Position: Confirmed by City. note- , Jv� PROJECT REF: FAC NO: 00-0028 These plans are approved for conformonce/7ith the City of Auburn s Engineering Division requirements Approved By: Date Approved: 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 10-10-00 SHEET REVISION 00 00 lr-- 00 r- 6 0 CIVIL ENGINEERING AND PLANNING CONSULTANTS CL 41410 Iva Mficng.- .411FIF116'm 0, V 1410- - , 03001643Sq i 0 0 Cu 1n m m cri LL- 0 a 3 0 Q1 a, 0 rn m O L n 0 SE 1/4 OF SECTION 31, TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. 414,56 INV.taca 41-" A (FIELD VARIFY) C 6 IN V. ExciTcH- 418. e (FIELD VARIFY) INV.tr- 425.E 41S,4Z F(FIELD VERIFY) �t5 �N - }wn LF 12" PVC L T I ZS,36 15 I 0 425 S 580 CONNECT *. 4" DRAINS FROM AAOv� .x .�`r u':3 }"x EX. VAULT AND EXISTING RESIDENCE LOCATED ON LOT 9 TO NEW CB AT INV.-427.37 A05;., .. , "�F .;� ..�>w �� .,� ¢�, �x ,, �,n .., ,. n, ��,, ,�. �. a � Fy t:•• .r, 3., FIELD VERIFY PROVIDE POSITIVE ,. .: -.^ `V ". ..- ,. 33✓ 5 #.Pa'+^at:$ .s: ,h. „^"'5 r . t,4, a, .a.,.n i k H = tt t�,.. i ',' .. «.- ,. , .. ..;. _ '. ::?� , -:F� ::,'��[ s i n^d ,, r yr� , .1t i'. . .?g "•? o ' ," IMAGE TO NEW C s* DRAINAGE 6 • x qu S • r u. , , r e.- , : v :�1 �� � � �� -: .v�;t . .. _ ,, �.�,, rk +4J*+ 0-5 , _ : S=0 4 F „ F t I E. —' / / I INV. MIN. FF-44 STUB=438.0 2 0, / F' ;,�� ���� STING / VAULT r' EX.' 40 DRAI GE - - rr / 1 I I d `� / EAsEc ('�' I I MIN. =446,00 I LOT1 i - - ,-.MIN. 448.00 I LOT2 L _ INV.GSSTUB-438.0 ` I I -' c LOB. i I- CB#2 (TYPE 1) 1 RIM - 4�0 / / / , ✓ / / / r" /' p,, ' --INSTALL APPROX. 79�i. .... � INV.1e426-8 ,79 ✓ / OF SILT FENCE PER COA F 't ,Y:� i y26.67 W �{ i STD. DTL JIDEV-6 I �: ` , ", ( N -Y ry E CITY OF' BUR \ STD. DTL. B- LIMITS OF CLEARING - 9 TEMPO Y ROCKED CONSTRUCTION ENTRA E` 24 WIDE X 50 LONG X i2 QEEP USE TO 8"~`QUARRY SPACES / r / X .►.. "."PER OA STD. DTL. EV-5. \ a•M+ _ / /' - \ _ �, �G - �,, ~ ` ✓, N 6 7.02 0' 9 so aft" t 4ft "Boom `= _ _ 88LF 12" PVC 4 __ S�O 4a,02, 0�' • . .. , zoLF 6"PVC .., 010 -DWIS ION 12 LIMITS OF C EARIN+G `~ CB r r r I 12�\ 13 RIM �3s:~�- T y 39�3 _ I 4&1 ... j \ � 6 �. -�-- INSTALL APPROX 795LF INV.1:"�436:58 , `r rr DIVISIO.I�J'S 1 I ' `-�� _14 OF SILT FENCE ER COA INV.s =43 ee- 43 I - STD. DTL #DEV 6 (SEE --CITY OF AUBURN r I _ r STD. DTL, 71) r 'j r I i 15 DIVISION 513 16 REVISM& REVISED PER C.O.A. REVIEW COMMENTS 10-10-00 TLR 035- � o F HYDROSEED OR SEED ALL AREA TO BE LEFT UNWORKED FOR MORE THAN 30 DAYS. USE THE FOLLOWING HYDROSEED MIX FOR TEMPORARY EROSION APPLICATIONS ONLY. APPLY AT THE RATE OF 80 LBS./ACRE. 409: PERENNIAL RYEGRASS 40X CHEWLINGS OR CREEPING RED FESCUE 1OX COLONIAL BENTGRASS 1OX WHITE DUTCH OR NEW ZEALAND CLOVER CIFICENOINEERINO ESION NC. REVISED PER CITY REVIEW COMMENTS 02-06-01 MTL I17-- GRAPHIC SCALE 15 30 60 ( IN FEET ) 1 inch = 30 ft. NOTES: 1. SEE SHEET C2 FOR GENERAL GRADING, TESC, do STORM SEWER CONSTRUCTION NOTES. 2. SEE SHEET C2 FOR CONSTRUCTION SEQUENCE. 3. ALL UNITS FOR SLOPE CALLOUTS ARE IN FT/FT 4. ALL STORM PIPES TO BE PVC - ASTM 3034 SDR 35. L.ECAENO 20 ROCKED CONSTRUCTION ENTRANCE SILT FENCE ....� s..... ■w LIMI TS OF CLEARING FINISHED GRADE CONTOUR - - -430- - --- EXISTING GROUND CONTOUR Record Drawing Certification These drowin conform to the Contractor's / nstructio records. By: Do . Z- --oz Title/Position: Confirmed by City:% Date: -1� ,-4 'dZ PROJECT REF: FAC NO. 00-0028 -Qle o/ �+vith These plans ore approved for conformance the City of Auburn's Engineering Division requirements Approved By: w S jme Date Approved: 120 3 a tU V� w N ..r L� �iol Z •v" Q �Qv J 2w w .N<6 J 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 02-06-01 SHEET REVISION 0 r- r d• 0 0 z O a 00 00 00 rn w J LP-1 0 M W to w 00 00 vi 0 0 00 It CIVIL ENGINEERING AND PLANNING CONSULTANTS CL QN10 I w I 0;L0 161ssq 0 0 N 01 m o; m cc1 0 U- CU 3 0 a 3 n 61 01 0 0, 0 C- a / Y N / SE 1/4 OF SECTION 31, TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. WATER SERVICE LINE W/ WATER METER (SEE CITY OF AUBURN STD.DTL. WASM-1) SAW CUT PATCH STA 8+80, 5,5' RT SHALL BE A MIN. EX. SSMH 1410-103 OF 6' WIDE RIM=415.74 INV."=408.11 IN V, e" wT= 408. 01 CONNECT TO EX, SS MAIN. INV.O MAIN=407.35 (FIELD VERIFY) n 28LF 6" PVC S=0.1661 a r b L � al, '. 0",� F fTMY e fi e o- 1. {� *b ,,�""• J sum ,ti _ � � . h � g t .k rya � �'� � ,�'•' , �`�� :<,> n. dr `'� -�a. �'BTk�" t„z.,�?�4' xr 4y s 3 � �d � �; t.^"��.`" �i4 - s� rz. �\ w �,�';� '�� � *wL`, kv� ,a�•-� fix" , �. �'S:��'�a '��`�"Awx+, ';•, y S ,;��, i,.',,, � _._M _ __250 6 PVC �T MM - EX• �k►U .r INV�/ CONNECT TO EX. SS MAIN. INV.O MAIN-411.50 (FIELD VERIFY) CONNECT TO EX. SS MAIN, INV.O MAIN-412.17 (FIELD VERIFY) 26LF 6" PVC %— S-0.3396 6"SSCO L,119.7 9 RIM =A1"2:88(i 1A ye 1-EX.) INV.-421.00 SAW CUT PATCH SHALL — BE A MINIMUM OF 6' WIDE STA 10+00, 6.5' RT -_._ 420 EX. SSMH 1410-102 -- - RIM-421.75 iNV."-413.48 INV.e wT=413.38 425 e' � F Xw �, •: Co x, , a� rf � tr S " 6�. 3 6 PV 3 S 32 6" PV jyD4375 F 6"P ... - —. N\—INV.41STU8 435.0 d + 4a„ f ♦r INV..OSTUB=435 0.., - LOT 1 ,, ...._ .......,,_ .,._...�_ - - ,- � � LOT 2 EX.I .00'DRAI �GGE, ' , i r'•-- ` ' LOT101 450 SAWCUT LINE (TYP). REMOVE AND REPAIR EXISTING PAVEMENT AND SIDEWALK PER CITY OF AUBURN STD. DTL. STSW-1 WATER SERVICE LINE W/ WATER METER (SEE CITY OF AUBURN STD.DTL.WASM-1 ) \ \\ wry_ \. ' \ T' \ �J \ \ t 9\ 60 a _ E DIVISION 5B ,-' 4a.0,f ` 11 1 12 �� 13 14 1 _ ! _ 15 r DIVISION 513 -_ __ -•_2 s � ! 10,032• ,, REVISIONS: REVISED PER C.O.A. REVIEW COMMENTS 10-10-00 TLR EXISTING 1 SSMH i 4. 0-1 01 GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) 1 inch - 30 ft" NOTES: 120 1. SEE SHEET C2 FOR GENERAL WATER do SEWER NOTES. 2. ALL UNITS FOR SLOPE CALLOUTS ARE IN FT/FT. 3. METERS SHALL BE 3/4" FOR EACH LOT PER CITY OF AUBURN STD. DTL. WASM-1 Record Drawing Certification These drawings conform to the Contractor's nstruct records. By t .' Do e: Title/Position: Confirmed by City, Date: PROJECT REF: FAC NO. 00-0028 s2 O/o/ �y These plans ore approved for conformonce�'with the City of Auburn's Engineering Division requirements Approved By. L2S24 Date Approved: P` e REAM �C^�C""n�-�M^ o PACIFIC ENGINEERING DESIGN INC. o 4 W iL d T� Z O M� VJ Q a .� a Q2W tvt' V W RH 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 02-05-01 SHEET REVISION C5 00 CO —i N CIVIL ENGINEERING AND PLANNING CONSULTANTS QlylO $7#C� 020 Olt" 94/ 1-1 1. SEE SHEET C2 FOR GENERAL WATER do SEWER NOTES. 2. ALL UNITS FOR SLOPE CALLOUTS ARE IN FT/FT. 3. METERS SHALL BE 3/4" FOR EACH LOT PER CITY OF AUBURN STD. DTL. WASM-1 Record Drawing Certification These drawings conform to the Contractor's nstruct records. By t .' Do e: Title/Position: Confirmed by City, Date: PROJECT REF: FAC NO. 00-0028 s2 O/o/ �y These plans ore approved for conformonce�'with the City of Auburn's Engineering Division requirements Approved By. L2S24 Date Approved: P` e REAM �C^�C""n�-�M^ o PACIFIC ENGINEERING DESIGN INC. o 4 W iL d T� Z O M� VJ Q a .� a Q2W tvt' V W RH 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 02-05-01 SHEET REVISION C5 00 CO —i N CIVIL ENGINEERING AND PLANNING CONSULTANTS QlylO $7#C� 020 Olt" 94/ 1-1 SE 1/4 OF SECTION 31 , TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. «.....................................................................................................................................................................................................................................................«.,...................._ ,_. _. _.__._... - - ......... ............................�.............................«r.........««..«_....................... «,...L.' ' ' . I _ i _ .. { ; . . I I � I 5ti ST STREET .. R ` w P ::: i i i P ........ ................................ R. � , . :» _ _ _ 10; 00' EX,: DRAINAGE 10' B ILOING ( ` is i.... i l.. I l . EA4MENT . 1 SMACK : ( 2Q.00'BUILDI 20..�' t. s s CCESS RO #. 25.: A TI YE GRO1 S OPE �„ IF SETBACK ' I EA M N IJICDING ENl/LOPr* —... '� �................. ' ...... .......... _ __,«...__.__ __._« «._«._«.................._.... _.. ..._......... «.,..................................... .. «..................«., .,,..__.....i .......................... _. ..,« .,. « � ... �.:..._........_...« «...« ..«.................. , " � ' .. ... _ .. � I .. I . . . 1 I .. ..... .......... t «« . »»» .« ..... 45fi.....».. « .« . ... «»....«........., .:...:................................... « _._«..........,...........L............................. _. _..........._...............�...««...«............... 1 ......:FIB ................. _ -: .. .... _..... 21: _........» ... «........ ». .. »..,_. .............. « ` ...... ............«.... I...«......... ........ «.....................L........_.......... «.. .. « «.L« �.. .. «........11...................................... ................ ...... «............. ........ t.......... ....... .........., - t « . �.. ... i . . .. ..... :�" ' XI5TING Aim _ ._«..._.......: _�..._,«....._........ :....... «__.«..:..�......_ .«�. _.:«._. �..«.� «.....�........_...,:..._... »...... 6»..m.! .: .............................................................................. ......»....„.. _ ., .;.. I ................................. «.. « _ . ;... :..- I I. ... ... ... .. s I. .............3,.......««.........................'s................................................................... »»»,..«««...........L.............,.................... » ..;..................................................«.. .. ^. f if A0%,0% : SECTION A —A SCALE: I"=20' (HOR. &V'ERT) DOWNSPOUT PVC CAP EXTERIOR WALL 2"(f) FINISHED GRADE (PROVIDE POSITIVE SEE ARCH. PLANS SLOPE AWAY FROM BLDG) .� FOUNDATION WALL —SEE STRUCTURAL PLANS 4" PVC (TYP) 6" x 4" TEE INTO TIGHTLINE .4 .. O O. 2"(t) 6" PVC TIGHTLINE (SDR 35 UNDER PAVEMENT). CONNECT TO 6" PVC STUBS PER GRADING AND DRAINAGE PLAN FREE DRAINING MATERIAL (AS REQUIRED) DOWNSPOUT TO TIGHTLINE 2.5"— EXTRUDED CONCRETE CURB. I " 1.0 R. -••� DRIVEWAY 12" ' 10« 5" o--2.5" 2" COMPACTED DEPTH OF CL. "B", A.C. _ 4" COMPACTED DEPTH OF A.T.B. 1 "(-) - ALTERNATE: 4" OF CRUSHED AGGREGATE COMPACT SUBGRADE TO 95% OF MAXIMUM DENSITY EXTRUDED CONC. CURB 1.5" R. 1.0" 1 6.0" Record Drawing Certification These drawings conform to the Contractor's construction records. By: /�orM w� �@►Gi �1't Date: 2-ZZ- oz Title/Position: ���✓ Confirmed by City: Date: A-,L PROJECT REF: FAC N0:00-0028 roil These plans are approved for conformance with the City of Auburn's Engineering Division requirements Approved B . PP Y' Date Approved: :�.. -- ,---, r---1 ttlSIQMS: RVAM PER C.O.A. REVIEW ICOMMENTS 10-10-00 TLR REVISED PER CITY REVIEW COMMENTS 02_05-01 MTL 3PACIFIC N G I N E E R I N G [:)ESION INC= PF, 035 oF_� I EXPIRES: MAY 6. 2001 1 a W 00 00 00 rn 99-71 PROJECT NO, TLR DRAWN BY 07-21-00 ISSUE DATE 02-05-01 SHEET REVISION C41ral CIVIL ENGINEERING AND PLANNING CONSULTANTS CL Q 0s01t1�5H 0 a CU r- m Q eyi CU Qj CM X -o w w CC Cn 0, O C_ n i Cn in I- SE 114 OF SECTION 31, TOWNSHIP 21 NORTH, RANGE 5 EAST, W.M. A�5 cI __._ _ ___._ ____42® REPLACE EXISTING MISSING OR DAMAGED GRAPHIC SCALE TREES WITH SAME OR EQUAL - TYPICAL 30 0 Is 30 so 120 '�— ark" r tix t�50 "..,9 "" {z "^�*�....""",�"" -•._ _ ._.... xa t sY r 1. ,:_.__'. 425 A�0s, g'.'W+ -.r' r ka,`a:,?`+"�'`.r�+w $ .;d c r h.1"' d•: �' A . a,s.znnw, ," e°'�N "rig'��-,��.�'d >�'[ � �,y a v, ( IN FEET ) ..:, �i -,.• ,. r.. � s � .. t.z �5,; _,. ,.. � r ,�'�'�. „;^.. ';`'• n�, u' ,.�r:. ,a-a,r :; d� a� k . ., cf+ K. #'r 1 ii1Ch : 30 ft. _ ,t -x,,. zak' ° i `�:�. • : , ,. `, �`... '::5r - - .._ *i ,.,. 1+d'.�",. + ";... ., f ay s.Er. , t x �� ,a�^�., >b. : r„ .. s � t. �- ��:.�� . �,..�w..• s ..�r �' '" -�:�r ,1"a' �.` ...=;y,. :,:,�' .;..: ;. x „..: .: '�" t rr a r ar pixh �� x � .y.�� _ r 3 c-. :.. WIN x `3 .:';v= �x �J,, i," „},y ar •i �.;,�m`�'�,x, * �;6' ,ug� aY.� ,h�nta„ "�'i �,:, + � e „ F �S"'�° kak .� ,za .», ✓ ��. •vm..,r ,.4. ..,., ,h.,, �;-,. �u,: + m•_ :,'�, ... .: .. �. .}^- o , .'x.*r.,. ,. c s.. . a_ a,�.. _„r s^ , _. 4 . '`{-_ .. v x t•- x .o:a .. . -5... a 4 ''i' s..-. `. a ,,?.. k,.,. '.Ex`'. .., 'i, ,,. .:_+.. ,.. k 3.. -,1,.. .r :;: .. ,. mot, �,�xi. ne,: it' ,> 'a Kr!"#�`d4t :.,. �,,.. Fyr- ewe, �, .. , , <•,;. ,. .,,.:} �. C,>` �rc£st?'. ,C, _ , „v N. .. ,,. :. ,. ,.. .. i , .. ..,.+:.•,:, vw-a 3U .1 :<.. ,.^:: y4 - a." .�G' .„x.,.;. Mn',a, � II ..,V, NOTES• -rwfr ,f ,' . a. i�t. ,?,.. _,y;Wxk, tf:. §r.r.:♦ sic .f a l":n•,n''s"ros r-F fi;. ,?- F ,•:, ^yy.,� 'I a -. �r � & -r k x', � C " r, ;: r .x :y, � ems^ ra• •� i t 4t.. `t,i -'a2✓ ., s i,if ` �" ,bt -, :. e t, _., >r, =. ... �. ., .,�hax*r x ,-*r !`:x a'x` s�. ;11 �-: .�� ^e F}. ,.a 3� h''•s:�a, �� , , '''' ,xr k >;•... Ev, r� � ...,_ �• 3 -.:., � * r:� r. . ` k. -�� RI+e - ..,.... ..,., ,t, u .w � '�w 4 a' em'S7•.g w:¢ „ ...: '�..., ya.�,. `rsl Sx'�,i '3 ,a.,r. ... y�,,, x a' ,: a•. ,. '4x. ,.., •_:. *;': ti.;fi�"xE:t°-::'d. +Q ,.. _,. s ry;rt +tm•,;-4,* ..:. � �, r 3 tt >• � -__ R N NURSERY. �, 1. PLANT TREES 1 HIGHER THAN GROWN I S �' , :;a_,PPsk �m r �: ;.. '`S .�. -• r t , .:r: r _.; .a ;fir .:, � ,..,-._ . _. �. • >f # ,,. {..�g�` , a�„si; .. ,. e m,�,��,*x'�:;� �,� r- . �.,. � —� - ry,txy',:.,, u. :1, ry. h� .:; ,.,,• :. •+ ;d v r~ r '.:-..,rk» a x,-. .. ,�. =7 0 3 .--_� ♦t �3 t .kSF'°.. 3 r, :k:,'?,; r , . , �"-�E� � �-, � 2. TREE PIT SHALL NOT BE MORE THAN 2 TIMES THE ROOT BALL DIAMETER. ,.t, , • , �;�#�.• a � ,,:� j`�` a^ x,>ficx':„ : s �.a,, 3• .,;,x. ax .�-.,: ,.; ,', _y. - , -_ �_.._ " _,. .._.._. � ...,, _. .fir, `�� '� s „-„�,.•, .► ,x;.-'.• x•.w.r, a k'.;` s x,a-.°, .. #, r. "�&. ,n'. ;:'', ,. k„f Ra ,z.- - 0.., � � �;,•,- ,u � �k��x „rr _. ,�.�As .�.-. „_.. _ I 69. ,__ - ,.. � , `;� �� :x� � � .�� �� , '� 3. SCARIFY BOTTOM AND SIDE OF PITS BEFORE PLANTING. . �, fix" r,. ,. .: ' ,. �.:.. .,a�4 ,:." fi . ...,`..•q.° � �. "' . s P a s Y > LOCALLY HEALTHY VIGOROUS, FREE � n 4 A TREES HALL BE NURSERY GROWN LOC LL G r �x ALL EES S S x fi d Y 4 � ,• a i V ^ r � s j 4 4- -.-_. x,y � �,�,r,;. ., .,� �,,., ,,, � � .� . .: f � .� fi, ,' �,_ FROM PLANT DISEASE AND INSECTS OR THEIR EGGS AND SHALL HAVE NORMAL -"`;. �F s ,,, :., -a* ��'�. ., ,�� �:1 c �' ;:"•" � /'`� � N . G. • "— �& �'a"�`- .. �r`�x4'��' +C,� ,F ,3,.a; f f .,. _.. •f`,* , �•- #�;��• rrk'i"E1�.y�� � 1'� + ><_>}.. �.,r,.x3':..- •` „,." `„�. -,a .iiS ' a. ; �'7r?a / .. / ,.- - ,. r,s s 'rd`un 5'" ,.mr„ ;s�._` ... .,,�: „ F�.. x , ,�,� ,t,r•� w,A w _ _.. .... _ � ,,w •„°Y �� ,�t � � �, HEALTHY ROOT SYSTEMS. , : • ..h. , s, .. a .. .a{:���4. it � r-- -� ... _�,.. _... .._...__ •lf 'µ' a�� '�'xi"g ' ,X ; `��'J^a3�� yyx; �y , u �,� tk 5. PLANTING BACK —FILL TO BE OF A MIXTURE OF TOPSOIL AND EA SS, f^ — — — _ �k TO 1 RATIO OR TWO WAY MIX 507' SANDY LOAM 50% STEER MANURE BY VOLUME. ARK MULCH SHALL BE A RELATIVE UNIFORM SIZE FREE OF STICKS / ✓' i `_ r `d�� �'" � tom' �4 LEAVES AND OTHER DEBRIS. .,�� �: 6. NO DISTURBANCE OR ALTERATIONS ARE ALLOWED WITHIN THE NATIVE '\� • / I 1- _ " " ._ } h� z GROWTH SLOPE PROTECTION N.G.S.P. EASEMENT ,EXCEPT AS NEEDED TO CONSTRUCT THE PRIVATE STREET IN TRACT 'A; SIDE SEWER, WATER, DRAINAGE -- EX .00 DRAB / = / 1 I I - AND OTHER UTILITIES. EAS, VE o��i�P / i i _LOT 2 i L i LOT 1 / LOT 3 .' i i _---' L -� . TRACT 'A' TREE LANTING / 7 - ,ACER C PESTRE 6 -ACER.. NLA , M , / - �' „r � 6 LA CATA / 7 - PSETSU CA M�NZESH _.♦ r _ 9 cad r __ / DIVISION 12 ap DIVISION 513 I 14 DIVISION /58 15 �. EVERGREEN TREE K%lWft REVISED PER C.O.A. REVIEW COMMENTS 10-10-00 TLR 035' _� of 7 DECIDUOUS TREE WIRE, TWIST TO TIGHTEN, IN DIA. RUBBER HOSE AS PAD TICK BARK MULCH — SEE N1 EARTH SAUCER W/4" BERM IURLAP OFF TOP 1/3 OF RC NTING BACK —FILL — SEE NC TING DETA N.T.S. STAKES ABOVE LOW BRANCHES PLANT SCHEDULE THUJA PLICATA (WESTERN RED CEDAR) 4 — 6 FEET PSEUDOTSUGA MENZESII (DOUGLAS FIR) 0 ACER GINNALA (AMUR MAPLE) 1 1/2"-2" CALIPER • ACER CAMPESTRE (HEDGE MAPLE) J ACER PLATANOIDES ARMSTRONG OR COLUMNARE (NORWAY MAPLE) ACIFicENGINEERINO ESIGiNINC. REVISED PER CITY REVIEW COMMENTS 02-05-01 MTL I Record Drawing Certification These drawings conform to the Contractor's construction records. By. /10"" I'l Lw '-Io'2 Date: Z -z2-oL Title/Position: Confirmed by City: Date: PROJECT REF: FAC NO:00-0028 These plans conforms with the City of Auburn's Planning Deportment minimum landscape requirements Approved By. S-A Date Approved: 02.08.0I G 18612 p cQz �� Fe / S i ERA,. ssIONA L EXPIRES: MAY 6, 2001 d 3 Q Uj 0) Q T w N Z 0 .m. 0 � 4a Z J �VW L1J5<0 Y d J 99-71 PROJECT NO. TLR DRAWN BY 07-21-00 ISSUE DATE 02-05-01 SHEET REVISION �7 00 0o 00 rn 3 J CIVIL ENGINEERING AND PLANNING CONSULTANTS CL QN10 .99wor 01D16l15y