HomeMy WebLinkAbout03D1739O N N CV O 1 I I I NE 1/4, SECTION 8, TWP. 1N, RANCE 5E CONSTRUCTION SEQUENCE: I STA. O+Od EX. SSMH INO. 511-52 RIM= 303.99 1. E. = 7 2.91. 94 (1 N) 2 91, s4 (OUT) GRAPHIC SCALE CORE'AND RECHANNEL 30 0 15 30 60 00 IN FEET 1. .=297.19, 12" CMP 1 inch = 30 )ft. I GR V. DRIVE A.C. PATCH EX. BLDG. EX. BLDG. i I I.E.= 296.27, 12" CMP I I . E. = 295.74, 18" D.I. t 13.2 44- LF - 8" 0 PVC SDR-35 ® 8:-SW. 0.54 DRIVE STA. 0+7-3 37; 21-.%' LT. 0+69.74 21.1 29.95 LF 6" 0 STUB 21. 06' LT ® 2% & C.0 PER AUBURN DTL. SEWER-02 EX. BL G. I. 294.19, 18" D.I. 1 STA. 1 + 13.17 g NEW SSMH NO. 512- 48" GENERAL NOTES: 1. THIS DEVELOPMENT PROJECT SHALL CONFORM TO THE CITY OF AUBURN'S REQUIREMENTS AND BE IN ACCORDANCE WITH THE APPROVED PLANS. ANY CHANGES FROM THE APPROVED PLAN WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER AND THE CITY. 2. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE "WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION" (2000/LATEST EDITION), EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY'S PROJECT SPECIFICATIONS MANUAL, AND THE CITY'S STANDARD CONSTRUCTION DETAILS MANUAL. COPIES OF THE ABOVE DOCUMENTS SHALL BE AVAILABLE AT THE JOB SITE DURING CONSTRUCTION. 3. A PRE -CONSTRUCTION MEETING SHALL BE REQUIRED PRIOR TO THE START OF ALL CONSTRUCTION. CONTACT THE PUBLIC WORKS DEPARTMENT AT (253) 931-3010 TO SCHEDULE A MEETING. 4. LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES MAY NOT BE SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD UTILITY LINES. IDENTIFICATION, LOCATION MARKING AND RESPONSIBILITY FOR, UNDERGROUND FACILITIES OR UTILITIES, IS GOVERNED BY THE PROVISIONS OF CHAPTER 19.122 REVISED CODE OF WASHINGTON (RCW). PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE -CALL (1-800-424-5555) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE AND TELEVISION). 5. PRIOR TO THE START OF CONSTRUCTION A PROPOSED ROUTE AND SCHEDULE FOR HAULING MATERIAL TO THE SITE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. IF THE CITY BELIEVES THAT THE PROPOSED HAUL ROUTE WILL ADVERSELY IMPACT THE STREET NETWORK, HAULING MAY BE LIMITED TO APPROPRIATE OFF-PEAK HOURS OR ALTERNATE ROUTES. 6. THE CONTRACTOR SHALL BE REPONSIBLE FOR PUBLIC SAFETY ON AND AROUND THIS PROJECT. PRIOR TO THE START OF WORK, ALL METHODS AND EQUIPMENT USED FOR TRAFFIC CONTROL AND STREET MAINTENANCE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. CONTRACTORS AND THEIR SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM. 7. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL ENGINEER. 8. CERTIFIED DRAWINGS ARE REQUIRED PRIOR TO ACCEPTANCE. REFER TO THE CITY'S RECORD I.E. 293.69, 12 CONC.RIM = nn�t (ADJU T TO RA E)298,95 LOT 2 OF KING COUNTY LLA S90MO40R RECORDED UNDER KING COUNTY CONSTRUCTION DOCUMENT" HANDOUT. I.E. = 289.04 (IN) 292. RECORDING NUMBER 9411141087 -----------I.E. = 288.94 (OUT) -- _ 292 55------------- STA. ++2 .-76, 25.03' LT. 1 +41.56 T- _--_--- 2 9 29.06 LF 6" 0 STUB a4: NI ER',BU H ® 2% & C.O. PER I AUBURN DTL. SEWER-02 REPLACE EX. CULVERT W/60 LF I I .E.= 29 .06, 12" CONC. 12" CONC. ® 3% (I.E. IN = 293.69, I.E. OUT = 2 1.89) � \ ; EX. LAWN -\-,. SEW. ESMT. 1. ATTEND PRE -CONSTRUCTION MEETING WITH CITY OF AUBURN. 2. BEGIN CONSTRUCTION PER PLAN. 3. UPON COMPLETION OF SEWER INSTALLATION, RESTORE PAVEMENT PER DETAIL. 4. CLEAN CONSTRUCTION SITE. NOTES: 1. PROVIDE CONTINUOUS ACCESS TO ALL PROPERTIES AFFECTED BY CONSTRUCTION OF THE SEWER LINE. 2. USE KOR-N-SEAL BOOTS ON SANITARY SEWER MANHOLES. 3. ALL EXISTING TREES AND CLUSTER OF JUNIPER BUSHES SHOWN ON PLANS ARE TO BE PROTECTED IN PLACE. 4. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE REQUIRED TO CONTROL ON -SITE STORMWATER RUNOFF BY USING TEMPORARY OR PERMANENT DRAINAGE EROSION/SILTATION CONTROL PROCEDURES. 5. THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO REDUCE EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL ALSO SWEEP ALL AFFECTED PUBLIC ROADS, AS NECESSARY; TO REMOVE MUD DEPOSITED AS A RESULT OF PROJECT CONSTRUCTION ACTIVITY. 6. ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION AND SEDIMENTATION IMPACTS ON ADJACENT PROPERTY AND DRAINAGE WAYS MUST BE STABILIZED ACCORDING TO THE FOLLOWING SCHEDULE; FROM APRIL 1 TO SEPTEMBER 30, AREAS AT FINAL GRADE AND THOSE WHICH ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN 30 DAYS, SHALL BE STABILIZED WITHIN 10 DAYS. FROM OCTOBER 1 TO MARCH 31, EARTHWORK ACTIVITIES SHALL BE CONDUCTED IN STAGES IN ORDER TO MINIMIZE SOIL EXPOSURE. EXPOSED SOILS WITH AN AREA GREATER THAN 5,000 SQUARE FEET THAT ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN 24 HOURS AND EXPOSED AREAS OF LESS THAN 5,000 SQUARE FEEET THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS SHALL BE STABILIZED IMMEDIATELY LEGAL DESCRIPTION I I EX. BLDG. EX. BLDG. I 333940 0280 I I I FULL DEPT141 CRUSHED ROC ' 6" MIN. A.C. PATCHI i •34 7 ______ DRAWING AREA DRAWING ARE ' STA. 2+50.22, 7.59' LT. -� I -� - SEE SHEET 2 (SEE SHEET 3) EP 7.3 7 g9 LF 6 �d =8------- ( ) � ® 2% & C.O. PER AUBURN DTL. SEWER-02 I _ 8' APPLE 333940 0287 E (1E' SA W. ESMT. _ ; ----------------------------------------------------------- I --------------- \ 1 ° ST 2+866A, LT. ---- --♦ LF 6" 0 STUB , ® % & C.O. PER I ' i I \\ 3 00 \ Ail URN, DTL. SEWER-02-6 BLDG. Ex. I 272." I ' 96 274.1 LF - 8 0 PVC I I \ \ ` S35 DR-0.A7 Moo % ' I I \ I \ C"v pi 4 ;E 302 `AR ;' \' � EX. BLDG. QUANTITIES: \ \ 33940 286 304EX. BLDG. 16 5.48 5 A, 5+ 3`r l0-2? 1-3U EX, BLDG. I I \ 1 SA.S S EST. STA 8"87 .0 LF ,. � 940 LF TRENCHING INSMH NO. 5 2 4r, 8" 7 \ PlvEx /1 I = 299-.-00 A JUS 0 GRADE) 303.12 I EX. BL' 29G. 4 (1 ) 2gq 02 21.31 16.5 \ \ I.E. _ ( UT 49 , 92 �1�/ 331 * 7LF - 8" vs PVC I i STA. 6+W.9&, 1 Er:96' LT. ij SDR 5 0 9:75-% 9.41% � 16'S �'� LF 6" 0 STUB -------- - ______ ® 2% & C.O. PER 71 3AUBURN DTL. SEWER-02 _ 33394 284-Y - 333940 0284 P ER T OR CABL %TV RISER PRIVA SAKI ARC' -- ER GR A V, S ,--�. - - SE - A --. - - -- STUB � A 12 R 2Qy r A \ 32 ,. t S i 1/ 6„ DOUG. t� FOUND REBAR/CAP t}+00. 20" MAPLE Q 16" �''`�-' 3z" cED�e ' qq i 4 OUG. 1IR 10" CE4 STA. �7 RT. �6.s1 6&'28-88 LF 6" 0 STUB k, -T 33 4 -028 ® 2% & C.O. PER SAN. S W. E'`S�II ��20 i AUBURN DTL. SEWER-02 STA. \ - NEW S NO. 512- , > 48\k ,� RIM f ( ADJUST TO,-<;RADE) EX. BLDG. 330,39 I.E. 321-14 (IN)-3 4 14.37 333940 0285 I.E. = 321-.G4 (OUT TA. 7+37-68, T. 323.44 f 02%&C.O.PE � AUBURN DTL. SEWER-02 SEWER SITE PLAN AS-BUILTS SF.T LY14Dr-ROROLmilD PIPE LOCATION BASED ON SU'tFACE FEATL'R3S. ACTUAI LOCATION MAY VARY. I CONFIRM THAT THE LOCATIONS, ELEVATIONS, DEPTHS, AND AS-BUMT COMMENTS REFLECTING MATERIALS ACTUALLY USED DURING CONSTRUCTION`!, ACCURATELY REFLECTS EXISTING FIELD CONDITIONS DETERNGNE BY ' OR UNDER MY DIRECT SUPERVISION ON THIS DATE; 940 LF - 8 0 PVC PIPE 4 - SANITARY SEWER MANHOLES I 6 - STUBS 162 LF - A.C. PATCH ; 29.11 FOUND REBAR- NO CAP STA. 9+36-1-3 NEW 8" CLEANOUT 4.31 RIM = 349.33 2"ECDA I.E. 336.48 5' SA W. ESMT. jv MAPLE S" EDARI Co R2» M -� x ?- o m 23G: LF - 8" 0 P 4' CEDAR .�... S -35 ® .49% 1 X STA. +59..52, . 7+ 60.0 6.9 RT �. 6 97.56 LF 6" 0 TUB ® 2% C.O. PER 333940 0288 AUBUR DTL. SEWER-02 CALL 48 HOURS BEFORE YOU DIG 1-800424-5555 > pA,0 RIVE 2eND ST �A 21,st ST NE 2pth �� SITE ST NE 1 19th DR 17th NE o R 16thZti'j' E- z VtClNtTY MATr �- SCALE: 1 " = 1000' LEGEND O EX. SSMH ❑ EX. POWER TRANSFORMER -0- EX. UTILITY POLE o EX. CABLE TV RISER 0 EX. GAS STUB -TPM- EX. TELE. PAINT MARK GPM- EX. WATER PAINT MARK GPM- EX. GAS PAINT MARK EX. CULVERT EX. DITCH X u - EX. FENCE oocl:�D EX. ROCKERY _- EX. CONIFEROUS TREE - EX. DECIDUOUS TREE DATUM: CITY OF AUBURN SHEET INDEX BENCHMARK: SSMH #511-52 - ELEVATION: 300.52 [NGVD29] 1 (ADD 3.53' = 304.05 [NAVD88]) 2 NOTE: CONSTRUCTED RIM AND INVERTS SHALL BE "AS -BUILT" TO CITY OF AUBURN DATUM [NAVD88] PARCEL NO: 3339400288 3 COVER PLAN PROFILE RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO THE CONTRA TOR'S CONSTRUCTION RECORDS. BY: DATE: �OQ�' 0 TITLE/POSITION: ,Aw CONFIRMED BY CITY D E: c m PROJECT REF: FAC 02-0021 THESE PLANS ARE "APPROVED" FOR CONFORMANCE WITH THE CITY OF AUBURN'S ENGINEERING DIVISION REQUIREMENTS. APPROVED BY: l ATE APPROVED: V LL LV Amb, 1: \ PROJECT \ 02220 ARMSTGNG \ 02220EING. DWG 03 v I o?;At 0 N 04 04 0 Al 10 �, `� / /jo ry 0co, \0 ('v 0\10 Co 318— A- Q2 C _3 00 ov L- 'V* GRAPHIC SCALE "I * Qr 0 / @ \,Try , / �/ / 0 10 20 40 ry V> \ ;Z\ I I I A-)' (Z:)' -)y \�f ML @ Q) �o 4, 40 Az _lZ5 41 vot ')v Q 4-9) 4�Z- 11 A�z ( IN FEET ) �/ /\, "/ �4.) C5 C-9 Q, t <* ': 4q:- I inch 20 ft. A-) 4- IQ:- Q Q 4v y. 10L 0 6j I-V 00' @ .0 ey 0), ci ?) 0 (C-b �D § J_ /V A., _Q7- T: e Cv C) 0) @ 6 Q) 0) y)0 108 \ � Tp - b blub of I REPLACED 12 CULVERT CROSSING, I.E. 292.14± 1 +100 0 C\j -- ------- -- - C) C) PLAN SCALE: 1 20' e / NATIVE FILL MATERIAL -FROM 'TRENCH EXCAVATION "(D-I-SK, ACED- B-Y.--PIPE- BE­DDl­Iqj,G­)- - r 0 CN RECORD DRAWING CERTIFICATION STA. 3+88.4 < N Q N _-_ _- __NEW__SSM­_H__NO._51-2 67 THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS. Lli uj RIM != 299.E)E)± (ADJU5_T-TO-GRADE) 5+00 DATE: o< o< 303.12- BY: (IN) 294�02_(IN) uj U) uj cn TITLE POSITION: I.E. 240--5* 293; 92-(OUT) STA. 2+86.fi86766 CONFIRMED BY CITY DATE: PROFILE SCALE: 1" = 20' HORIZ. 1 " = 5VE R T. AS -GUILTS SET UNDERGROUND PIPE LOCATION BASED ON SURFACE FEATURES. ACTUAL LOCATION MAY VARY. I CONFIRM THAT TIE LOCATIONS, ELEVATIONS, DEPTHS, AND AS-BLW COMMENTS REFLECTING MATERIALS ACTUALLY USED DURING CONSTRUCTION, ACCURATELY REFLECTS EXISTING FIELD CONDMW AS DETER UNDER MY DIRECT SUPERVISION ON THISDATE. CALL 48 HOURS BEFORE YOU DIG 1 —800-424— 55551 (*TC++_vR( STA. 4 + 00.46 IiTu m PROJECT REF: FAC 02-0021 THESE PLANS ARE "APPROVED" FOR CONFORMANCE WITH THE CITY OF AUBURN'S ENGINEERING DIVIS4ONe. REQUIREMENTS. APPROVED BY: DATE APPROVED: 3 17-01 I] 1 ' I GRAPHIC SCALE LDG. 1 20 0 10 20 40 I 1 I QUANTITIES: EX. BLDG. 1 ( IN FEET) 1 $» +3 ' LT 1 940 LF TRENCHING 1 inch = 20 ft. I STA 5 6,0? � f 3. 0 I 940 LF - 8" 0 PVC PIPE 1 i t -r0 GRADE) -1-3.0 LI 1 EX. BLDG.4 - SANITARY SEWER MANHOLES 1 21_31 � 16.E ELT I 1��3i2•� STA. 6+�, 1`5-f}0 LT. 6 -STUBS 3t1'� LF - 8 0 PVC I 162 LF A.C. PATCH SDR- 5 @ � 9.41 % 16.5 � 00 LF 6 0 STUB I @ 2% & C.O. PER 1 ------�•--.� =._ _ - AUBURN DTL. SEWER-02 ' 333940 0284 29.11 333940 0284 �� CABS 'TV RISER STA. 9+36.13 ; Ei AR- P FOUND REB NO CA W 8" CL W - PO ER TRAM ORMER NE EANOUT SA SEW. ESM 354 31RIM - r AS STUB - 8" 10",20" CEDA -i 16 DOUG. FIR32 Ctrt 2� Q, ES I.E.E6 \ A -. —_ 15 S W. M T. 13 4 4 MAPLE 18„ CE - 1 ('-, , D 16"C r2" M X X X — 14 UG. IR 10" CED X - _: 1 332i7'' MAPLE �` SAN. S W. GSM G„ GEDA _ _ _ _ _ - f � Y . _-X 230.9 STA. 6 �`' LF - 8" 0 P 4 CEDAR NEW S NO. 512 e8, \ 48 „ �, S -35 @ .49% !x RIM = f ADJUST TO�ADE�� ��`�, `�' \ STA. +&9:59-, .7+ 0.02 EX. BLDG. 330,39 1.E. (IN) 323 49 LF 6 0 TUB 333940 0285 � � \ 0 2% C.O. PER 333940 0288 I.E. = 3� (OUT TA. 7+3�-6�$, " . T. �� T ,, AUBUR DTL. SEWER-02 7.50 6 � STUB -����, 1 �. 2% & C.O. PE AUBURN DTL. SEWER-02 V PLAN SCALE: 1" = 20' aal / i 60.02 I 9+00 ASPHALT CONCRETE CLASS B (3" MIN.) REPLACEMENT PATCH TO BE 1" THICKER THAN PREVIOUSLY FINAL JOINT MUST BE SAW CUT EXIST. ASPHALT CONCRETE 1 1 /2" MIN. ...... ......... 6„ 6" MIN. COMPACTED CRUSHED ° 00 o ° SURFACING TOP COURSE o 0 0 0 0 0 ° 0 NOTES: ° 0 0 0 00 ° o 0 0 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED EACH 0 0 o DAY, UNLESS PERMISSION IS GRANTED TO DO OTHERWISE BY THE COMPACTED CRUSHED ROCK BACKFILL 0 00 0 ° o 0 ° o CITY ENGINEER AND TRAFFIC ENGINEER. 2 ALL JOINTS BETWEEN THE NEW & EXIST. ASPHALT PAVEMENT o - SHALL BE PAINTED WITH HOT ASPHALT OR ASPHALT EMULSION. AS REQUIRED 3. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN TWO (2) WEEKS OF COMPLETION OF WORK WITHIN THE ROADWAY AREA. PAVEMENT RESTORATION DETAIL 00 0 N.T.S. Ln \ 0 Co; ro -330 - As bU I ITS SET UNDERGROUND PIPE LOCATION BASED ON SURFACE: FEATURES. ACTUAL LOCATION MAY VARY. I CONFIRM THAT THE LOCATIONS, ELEVATIONS, DEPTHS, AND AS -BUILT COMMENTS REFLECTING MATERIALS ACTUALLY USED DURING CONSTRUCTION, ACCURATELY REFLECTS EXISTING FIELD CONDnWW AS DETERMF,S.by. MXQWMDER MY DIRECT SUPERVISION ON THIS CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS. BY: DATEA TITLE/POSITION: �_e CONFIRMED BY CITY DATE: ULU PROJECT REF: FAC 02-0021 THESE PLANS ARE "APPROVED" FOR CONFORMANCE NTH THE CITY OF AUBURN'S ENGINEERING DIVISIONc? .5_1-1.o3 REQUIREMENTS. APPROVED BY: DATE APPROVED: -/7-403 1 2220 OF 3 1 t\PR01ECT102220 ARMSTONG \ 02220ENG. DWG 03 0 173ST