Loading...
HomeMy WebLinkAbout05D1755ni 11 334100-0140 LOCATED IN SECTION 17, T21 N, R5E, W.M. AUBURN, WASHINGTON � I EXISTING FORCE MAIN WAS / i INSTALLED PER POLISHCHUCK /j z / & BUTTS SEWER EXTENSION PARCEL "D" M ;;,�j - PLANS. FAC #00-0009 & 1� , // j / 9306159007 FAC #01-0003 .�''`� \ I o APN 334100-0090 APN un RM 334100-0095 w / , \ —�+- EXIST. EX.IST —� IE = 66.36 �. l / i / APIs C, o. EXIST 2�/2"0 HDPE 2.5' / APN SDR7 PER FAC (TYP) 334100-0125 00-0009 EXIST. PUBLIC / / \ SANITARY SEWER / EASEMENT sr APN �, / / \EX SSMH / 334100-0130 "o\ "'" �/ / r / '� j RIM=69.74' CTR. CHANNEL = 62. 5' 8„ IN SW \ XI I \ / / ,� 6" IN NW E S.T N G \j \ � �\HOUSE \. '��� (E) C.0/�S APN , •.'•. / �� � � ��\� � ,,..--__ '� EXISTING 2"0 ✓ / / HDPE SDR7 (200 PSI) EXISTING \ WITH WELDED JOINTS \ HOUSE \ PER FAC 01-00031, o / / /� / (E) CONNECTION \ \ Lp \ \ \ 3' �r / / VALVE BOX PER DETAIL 2/ o/ 11 i / C2. '10 l i \ �V �•�'. � / j / , NOTE: APN \ J, AS SEWER LINE IS EXTENDED ` THE,CLEANOUTS SHALL BE 334100-0145 ! �p� /y .- -.•._ - / / j / ~ / REMOVED AND ONLY ONE o/ / i" CLEANOUT AT THE END OF -- UBJECT SITE ;ro cap A CONTRACTOR TO FIELD - LOCATE EXIST. WATER MAIN PRIOR TO CONSTRUCTION IMLL R / CONNECT PROPOSED FORCE~ / MAIN TO EXIST. CLEAN OUT $TRUC110N NOTES: 1. CONTRACTOR IS TO REMOVE AND REPLACE ALL HARDSCAPE AND LANDSCAPING DISTURBED BY FORCE MAIN \\ CONNECTION VALVE BOX PER DETAIL �.%INSTALL: 182LF `y 2"0 HDPE • 11 • W/ WELDED JOINTS FORCEEND CLEAN OUT @ PROPERTY PER DETAIL l/C2, CAP, MARK AND SEAL END OF FORCEFUTURE EXTENSION = 1dp INSTALLATION BACK TO ORIGINAL CONDITION. (TYP) I 2. ALL SIDE SEWERS WILL BE INSTALLED WITH INDIVIDUAL SIDE SEWER PERMITS WITH THE CITY OF AUBURN, A COPY OF WHICH SHALL BE ATTACHED TO PUMP INFORMATION FOR CITY RECORDS. / 3. THE EXISTING CONTOUR AND PAVEMENT INFORMATION WAS PROVIDED BY A CITY OF AUBURN AERIAL / - PHOTOGRAPH DATED 05/2001. THEREFORE, THE CONTRACTOR IS TO VERIFY EXISTING LOCATIONS AND AND ELEVATIONS PRIOR TO CONSTRUCTION. i 4. THE CITY SHALL BE PROVIDED WITH 5 COPIES OF CERTIFIED MANUFACTURER'S LAB DATA ON ALL PIPE AND INSTALL: CONNECTION FITTINGS. VALVE BOX PER DETAIL 5. THE SPECIFIC GRINDER PUMPS TO BE INSTALLED FOR THE LOTS/RESIDENCES SHALL BE AN E/ONE SEWER 2/C2. SEE CONST. GP2010 OR EQUIVALENT. THE CITY OF AUBURN WILL HAVE THE PUMP SPECIFICATIONS ON FILE. NOTE 8. SANITARY SEWER EXTENSION PLAN 6 SEWER NOTED S E 1 "=30' NOTE: PROPERTY LINE DATA HAS BEEN TAKEN FROM BEST AVAILABLE DATA AND IS NOT THE RESULT OF A RECORDED BOUNDARY SURVEY. UTILITY CONFLICT NOTE: CAUTION: THE CONTRACTOR SHALL SE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY PCTHOLING THE UTILITIES AND SURVEYING THE HORLi ONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLI'14G UTILITY LOCATE 0 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE NOT GUARANTEED ANIi ARE SUBJECT TO VARIATION, IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONS;, LT POE ENGINEERING, INC. TO RESOLVE ALL PROBI.~EhiS PRIOR TO PROCEEDING WITH CONSTRUCTION. ��..• A XISTING ACROSS PARCELS 334100-0130 & 0135 (FAC 01-0003) MAY NOT HAVE BEEN INSTALLED AT THE TIME OF PERMIT ISSUANCE FOR THIS PROJECT, CONTRACTOR TO COORDINATE WITH PROJECT OWNER TO FACILITATE CONSTRUCTION OF THIS PROJECT. 7. -09NTRA6TOR TO GOORDINATE WITH FAe oi 8003 OW�0 TO MOYE 6LEAN OUT 12 FEET NORTH OF HYDRANT AND PROVIDE 45 DEGREE FITTINGS TO dOG FOR6E MAIN AR66ND HYDRANT FOR SOUTHERLY EX ENSiON. tdBEB- 8. CONTRACTOR TO OBTAIN LAND OWNER PERMISSION & VERIFY INSTALLATION LOCATION, DO NOT INSTALL IF LAND OWNER REFUSSES TO GRANT PERMISSION, LATE COMER FEES MAY BE ASSESSED AT TIME OF FUTURE CONNECTION TO FORCE MAIN. 9. RESTORE ROAD SHOULDER TO ORIGINAL OR BETTER CONDITION. RECORD DRAWING CERTIFICA11ON THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS. BY: DATE:�d-D TITLE/POSITION CONFIRMED BY CITY DATE. PROJECT REF; FAC 04-0017 THESE PLANS ARE "APPROVED" FOR CONFORMANCE WITH THE CITY OF AUBURN ENGINEERING DIVISION'S REQUIREMENTS APPROVED BY: _ -�, DATE APPROVED: 7ZZf 15TH ST. NE 10TH StL� NE 8TH ST. NE. 25 P. Zv SITE—'' VICINTY MAP OWNER INFORMATION JANILEE A. JEFFERY 30525 114TH PLACE S.E. AUBURN WA, 98092 (253) 939-8980 SURVEYOR CRONES &ASSOCIATES 2M 190TH AVE S.E. KENT, WA. 915042 PH: (425) 432-5930 FX: (425) 432-5933 DATUM (NGVD 29 VERT) N.W. CORNER OF POWER VAULT LOCATED 10' SOUTH & 15' WEST OF SANITARY SEWER LIFT STATION 0 N.E CORNER OF 320th ST S.E. & 104th PL. S.E., ELEVATION 71.02 BENCH MARK CITY OF AUBURN BENCH MARK #25-E SECTION CORNER MON. AT INTERSECTION OF R STREET N.E. AND 8th STREET N.E. ELEVATION 66.78. LEGAL DESCRIPTION THAT PORTION OF LOTS 26 AND 27, C.D. HILLMAN'S GREEN RIVER ADDITION, DIVISION NO. 1, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 17 OF PLATS, PAGE(S) 67, IN KING COUNTY, WASHINGTON, AND UNPLATTED PORTION OF GOVERMENT LOT 2, SECTION 17, TOWNSHIP 21 NORTH, RANGE C:D 5 EAST, W.M., IN KING COUNTY, WASHINGTON, AND THAT PORTION OF GREEN RIVER BOULEVARD VACATED, DESCRIBED AS WHOLE AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF LOT 21 OF SAID C.D. HILLMAN'S GREEN RIVER ADDITION, THENCE SOUTH 31'03' EAST ALONG THE NORTHEASTERLY LINE OF LOTS 21, 22, 23 AND 24, A DISTANCE OF 316.75 FEET TO THE SOUTHWESTERLY LINE OF GREEN RIVER BOULEVARD (104TH PLACE SOUTHEAST) AS ESTABLISHED IN ORDER OF VACATION RECORDED UNDER AUDITOR'S VAULT FILE NUMBER 4667679; THENCE SOUTH 36'45' EAST ALONG SAID SOUTHWESTERLY LINE 194.21 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING SOUTH 36*45' EAST 23.16 FEET; THENCE SOUTH 33'26' EAST 67.01 FEET, THENCE SOUTH 58*57' WEST 110.00 FEET, MORE OR LESS, TO THE EASTERLY BANK OF GREEN RIVER; THENCE NORTHERLY ALONG SAID BANK TO A POINT WHICH BEARS SOUTH 58*57' WEST FROM THE TRUE POINT OF BEGINNING; THENCE NORTH 58'57' EAST 110.00 FEET, MORE OR LES`:a, TO THE TRUE POINT OF BEGINNING. TAX PARCEL NUMBER: 334100-0145-08 PARCEL NO. 334100-0145 LEGEND DESCRIPTION NEW EXISTING WATER METER EE CONNECTION VALVE BOX STORM SEWER - - - SD — - SANITARY SEWER —SS— - - -SS— FORCE MAIN CLEAN OUT • o WATER MANHOLE POLE p_ A.C. PAVEMENT REV. DATE BY DESCRIPTION J o C) C.7 Z CV M O 00 CmD ®,.,,, M w Q W ® J caw=® 000 z00 J$mr� z m 0�0— Q W W Ln '��-) = LAJ CL LAJ Z 0 W W J Q {ii c!� Z i"— LAJ C� W L.L.! 1..1_ LAJ L.LJ r S t�T�'�A!ls EXPIRES 2005 DATE ,lULY 2004 DRAWN BY G.MO DESIGN BY D.E.B.Cl JOB N0. 04-026 SHEET NO. OF 2 0 75 ................ .................... ................ ......... ...... ....................» ............ ............................... » 75 . . . .. . . . . . . .. »..................... .................... ...... .................... M............................................ ) ..................... ................................................... ...................2 AS SEVOI: LINE IS N If . . EXIST. 6 D. . EXTENDED II ... WATER THE CLEANOUTS SHALL BE If ... ASSUMED „ -MAIN REMOVED AND ONLY ONE. .. ...HAVE4 _., 8" .MIN. CLEANOUT AT THE END OF EXIST. 8 If CLEAN OU T COVER .................... .... ....... »...... ........ M.....�.............. ....................., THE LINE SHALL REMAIN. ..... ...................» ..................... , ......... • 69 .......................................................................................... ..................... ................ fE 69 �EXIST.'CLE AN Nq.EAN EXISTII.ff.✓ ../j,. �. -ti ll- ... ..,,. ,,....... EX:CLEAN OUT GRAD OT ...... I .. - ..-....-.,.,. :�....+T. , ,.....,., .................... ........ .......................................gym...rr.................................................... ........................................» . I II .... ...... j EXE T. 8PVC . . . CONNECT PROPOSED ,► z FORCE MAIN TO EXIST. .r III i ........ ... CLEAN OUT .. � / ./ ...... ��....w.............................. •.....................» .... 53 ................. EXLTSSMH COA.711�3763• . �. _ J� : RIM 73.00: ------------------------..---.-.--- -. -- -----.--- -.- ----------.------.-.-.-----y--- J` ,, ,,;,.., - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,8 -- ---- - - - - - - - - - - - - - - - - - - - - -------- _- -�T- INV 65;92 OUT �8' N} sz� r --- -- -_ _--- ----- _ - - --.- -----.---_-- --_ -_-- - --.- - -- _.-- --- -- -.__ --.-.- --- _- _-------- -- ----: INV6fi'01-IN 6"so .W F- .. ............................ .1 ...................... 1................. ....•.M....M..MM.... M... M......M............. ............................................MM ...................... .................... ...................M.....1 •.........•......M... n. •... •myk .11 ... .............•.....•. ......................•♦.I.fl.f....1.......•.I•.....f.1........................l..... •....• ....... .••........ . .n...................•••1....••fM...•...M.I.M1.f�.•M•...•..MM....M............M.......•.....................M..IM.....MM.......................f....................................f•w......... . ...M.� ... .. HDPE SDR7 (200 PSI) ; : E „0 Hp Lr EXIST. J M. WATER MAIN W/ WELDON JOINTS, SDR7 200 PSI' WITH .. ..... D WELDED JOINTS PER (ASSUME 70 ... LINE TO BE INSTALLED .: . . FAC 01-0003: 48" MIN LEVEL OR W/ SLIGHT HAVE COVER)..........»......................................................... ....................................................................... 57 57.............................................................................................................. S10K.K.N.QRTN............................................................................................................ ...............................................M.................................. ............. ....................................................,. GENERAL PLAN NOTES 1. THIS DEVELOPMENT PROJECT SHALL CONFORM TO THE CITY OF AUBURN'S REQUIREMENTS AND BE IN ACCORDANCE WITH THE APPROVED PLANS, ANY CHANGES FROM THE APPROVED PLAN WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER AND THE CITY. 2. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE "WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION" (2000/LATEST EDITION), EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY'S PROJECT SPECIFICATIONS MANUAL. COPIES OF THE ABOVE DOCUMENTS SHALL BE AVAILABLE AT THE JOB SITE DURING CONSTRUCTION, 3. A PRE -CONSTRUCTION MEETING SHALL BE REQUIRED PRIOR TO THE START OF ALL CONSTRUCTION. CONTACT THE PUBLIC WORKS DEPARTMENT AT 253-931-3010 TO SCHEDULE A MEETING. 4. LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROX. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES MAY NOT BE SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD UTILITY LINES. IDENTIFICATION, LOCATION MARKING AND RESPONSIBILITY FOR, UNDERGROUND FACILITIES OR UTILITIES, IS GOVERNED BY THE PROVISION OF CHAPTER 19.122 REVISED CODE OF WASHINGTON (RCW). PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE -CALL (1-800-424-5555) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE AND TELEVISION). 5. PRIOR TO THE START OF CONSTRUCTION A PROPOSED ROUTE AND SCHEDULE FOR HAULING MATERIAL TO THE SITE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL, IF THE CITY BELIEVES THAT THE PROPOSED HAUL ROUTE WILL ADVERSELY IMPACT THE STREET NETWORK, HAULING MAY BE LIMITED TO APPROXIMATE OFF-PEAK HOURS OR ALTERNATE ROUTES. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY ON AND AROUND THIS PROJECT. PRIOR TO THE START OF WORK, ALL METHODS AND EQUIPMENT USED FOR TRAFFIC CONTROL AND STREET MAINTENANCE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL CONTRACTORS AND THEIR SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM. 7. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER. 8. CERTIFIED DRAWINGS ARE REQUIRED PRIOR TO PROJECT ACCEPTANCE. REFER TO THE CITY'S "RECORD CONSTRUCTION DOCUMENT" HANDOUT, CONSTRUCTION SEQUENCE 1. ATTEND PRECONSTRUCTION MEETING WITH CITY OF AUBURN. 2. DURING DEMOLITION OR CONSTRUCTION IN ROADWAY RIGHT OF WAY, PROVIDE ADEQUATE SAFEGUARDS, SAFETY DEVISES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NECESSARY TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC AND TO PROTECT PROPERTY IN CONNECTION WITH THE WORK COVERED INDICATED ON THESE PLANS. ANY WORK IN THE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW REQUIRES AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC EFFECTED. ALL SECTIONS OF WSDOT STANDARD SPECIFICATIONS 1-07.23 - TRAFFIC CONTROL - SHALL APPLY. 3, BEGIN CONSTRUCTION. 4. MARK TERMINATION OF FORCE MAIN PER THE SANITARY SEWER CONSTRUCTION NOTES. 5. PROVIDE SURVEYED AS -BUILT DRAWINGS OF THE SEWER PER CITY OF AUBURN REQUIREMENTS. INSTALL: MALE AIRHOSE FITTING 1" DIX-LOCK "QUICK ACTING COUPLING W STAINLESS STEEL MALE HEAD X FEMALE NPT END. PART #05583 n ------- 2 x 4 MARKING STAKE AT PL FFULLY ALVE BOX do PORTED FLEXIBLE COMPRESSION COUPLING L VALVE C DP SDR7 (200 PSI) i JOINTS PER01 0003 THRUST BLOCK 1'x1'x0.5' PLUG FOR FUTURE CONNECTION BALL - VALVE GRAVEL BEDDING SEWER MAIN PROFILE SCALE: 1"=30' HORZ. 1"=3' VERT. 1. THE CITY SHALL BE PROVIDED WITH 5 COPIES OF CERTIFIED MANUFACTURER'S LAB DATA ON ALL PIPE AND FITTINGS. 2. THE SPECIFIC GRINDER PUMPS TO BE INSTALLED FOR THE LOTS/RESIDENCES SHALL BE AN E/ONE SEWER GP2010 OR EQUIVALENT. THE CITY OF AUBURN WILL HAVE THE PUMP SPECIFICATIONS ON FILE. A 0.5" STYROFOAM I 1 INSULATION - F XALVE BO Y PORTEDL VALVE -45' ELBOW SCH 80 PVC r- WYE SCH 80 PVC - _ THRUST BLOCK PEA GRAVEL OR 1' x 1' x 0.5' CRUSHED STONE 2" PRESSURE TIGHT CAPPING CLEAN -OUT N.T.S. UTILITY CONFLICT NOTE: CAUTION: VIEW A -A -2�PE SDR (200 PST) WITH WELDED JOINTS PER FAC 01-0003 FLEXIBLE COMPRESSION COUPLING THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING U1ILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING U1ILITY LOCATE 0 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE NOT GUARANTEED AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT POE ENGINEERING, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. THRUST BLOCKING 1/2 CF � 1. CUT -IN CONNECTIONS REQUIRE TRACER WIRES TO BE SPLICED TOGETHER USING SHRINK TUBING 2, FOUR OR MORE STACKED METER BOXES MAY BE REQUIRED FOR DEPTH 2 LOOP 1 3. CARSON BOX SHALL BE MARKED FOR SEWER. M8JERIAL LIST ALL PVC WILL BE SCHEDULE 80 3, 3 4 5 6 7 8 4 3 9 AND THREADED *1. CARSON JUMBO METER BOX (PART #1730) _ STACK AS REQUIRED. *2. 1 - CARSON LID (MARKED "SEWER") FROM TO 3. 1 Y4" POLYETHYLENE PRESSURE PIPE GRINDER = _ =''' = COLLECTOR fQR 7 -- - l� (LENGTH TO SUIT) PUMP MAINLINE 4. 2 - lY4" COMPRESSION COUPLING (PVC) CLEANOUT 5. 2 - 1 Y4" x 6" NIPPLE (PVC) 6. 1 - 1 Y4" BALL VALVE (PVC) TRACER WIRE INSULATED 12 GAUGE 7. 1 - lV4" x 3" NIPPLE (PVC) WIRE (SOLID CORE) TO BE WRAPPED 8. 1 - lV4" BRASS SWING CHECK VALVE AROUND THE PIPE FROM COLLECTOR 9. 1 - REDUCER SDR 11 (SIZE TO SUIT) MAINLINE AND CONTINUE WIRE TO GRINDER PUMP CLEANOUT (AS SHOWN). 10. 1 - TEE SDR 11 (SIZE TO SUIT) * STREET USE REQUIRES FOGTITE #2 CONCRETE BOX AND TRAFFIC BEARING LID (H-20 LOADING) RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO THE CONTRACTOR'S CONSTRUCTION RECORDS. BY: S DATE: - TITLE/POSITION CONFIRMED BY CITY DATE: COLLECTION VALVE BOX DETAIL N.T.S. PROJECT REF: FAC 04-0017 7-2tloyAy THESE PLANS ARE "APPROVED" FOR CONFORMANCE WITH THE CITY OF AUBURN ENGINEERING DIVISION'S REQUIREMENTS APPROVED BY: --- -�� DATE APPROVED: -7Z5 0# REV. DATE BY DESCRIPTION 1 07/29/04 G.MO PLAN CHECK REVISION 2 ///oS/o 4"01,0 p S- /3 vices ON bl ro 0 F= V) CD Vr/ C)d' ca I C) C,4 n p 00 • LL Rt�V 6" x �awU- _a W CL: ~ wM N F -TLQ =J� V' �, t__z0o All 00 = Ci i p � L z m W vi U LLJ Lij W cz LLJ Q .^. w V) _0 V) LAJ W W LA.. C) V) CL- CL �- ai EXPIRES L8 2003 •l i 2.a ( b 4r DATE JULY 2004 DRAWN BY G.MO DESIGN BY A.F.P. JOB NO. 04-026 SHEET NO. C20F 2 05 D 1*7 j ,