AUBURN CHEVROLET - GE07 INC. - STORM DRAINAGE IMPROVEMENTS
GENERAL NOTES
1. This development project shall conform to the City of Auburn's requirements
and be in accordance with the approved plans. Any changes from the approved
plan will require approval fro the owner, engineer and the City.
2. All workmanship and materials shall conform to the "Washington State
Department of Transportation (WSDOT) Standard Specifications for Road, Bridge,
and Municipal Construction" (latest edition), except where supplemented
or modified by the City's Construction Standards Manual. Copies of the above
documents shall be available at the job site during construction.
3. A pre —construction meeting shall be required prior to the start of all
construction. Contact the Public Works Department at 253-931-3010 to schedule
a meeting.
4. Locations shown for existing utilities are approximate. The contractor is
cautioned that overhead utility lines may not be shown on the drawings. It
shall be contractor's responsibility to determine the true elevations and
locations of all underground utilities and the extent of any hazard created by
overhead utility lines. identification, location marking and responsibility
for, underground facilities or utilities, is governed by the provisions of
Chapter 19.122 Revised Code of Washington (RCW). Prior to starting
construction, the contractor shall call ONE —CALL (1-800-424-5555) for utility
locations (water, sanitary sewer, storm sewer, gas, power, telephone and
television).
5. Prior to the start of construction a proposed route and schedule for
hauling material to the site shall be submitted to the City for approval. If
the City believes that the proposed haul route will adversely impact the
street network, hauling may be limited to appropriate off—peak hours or
alternate routes.
6. The contractor shall be responsible for public safety on and around this
project. Prior to the start of work, all methods and equipment used for
traffic control and street maintenance shall be submitted to the City for
approval. Contractors and their surety shall be liable for injuries and
damages to persons and property suffered because of contractors operations or
negligence connected with them.
7. All construction surveying for extension of public facilities shall be done
under the direction of a Washington licensed land surveyor or a Washington
licensed professional civil engineer.
8. Certified drawings are required prior to project acceptance. Refer to the
City's "Record Construction Document"handout.
CONSTRUCTION SEQUENCE
1. ATTEND PRE -CONSTRUCTION MEETING WITH CITY.
2. CONTRACTOR SHALL CONTACT ONE CALL (1-800-424-5555) AND
LOCATE ALL UNDERGROUND UTILITIES.
3. PROFESSIONAL SURVEYOR TO PROVIDE CONSTRUCTION STAKING, AS NEEDED.
4. CONTRACTOR SHALL STAKE AND FLAG THE LIMITS OF THE PROJECT.
5. INSTALL EROSION CONTROL FACILITIES.
6. GRADE SITE FOR STORM DRAINAGE IMPROVEMENTS.
7. INSTALL STORM DRAINAGE IMPROVEMENTS.
8• FINISH GRADING AND PAVING SITE, INSTALL REMAINING IMPROVEMENTS.
9. PROVIDE VEGETATION TO DISTURBED AREAS.
10. UPON APPROVAL FROM THE CITY INSPECTOR REMOVE EROSION CONTROL
FACILITIES AFTER SITE HAS STABILIZED.
11. CLEAN SITE. FLUSH DRAINAGE SYSTEM & REMOVE MATERIAL
COLLECTED IN CATCH BASINS.
ELEVATION DATUM
CITY OF AUBURN BENCH NUMBER 16-1
NAVD 88 ELEVATION = 66.56
MONUMENT @ CENTERLINE OF
16TH STREET N.E. AND "I" STREET N.E.
A PORTION OF
NW 1/4 SECTION 7, TOWNSHIP 21 N., RANGE 5 E., W.M.
CRY OF AUBURN, KING COUNTY, WASHINGTON
ST P_
z
yEx.
;21ST
ST NE
n
W-
in
tit
z
Z
17TN
U�
, m
RK
,ARZDE
:
z
Q
15TH ST
NE
1�Tf
NE-
AUBURN
NORTH
6b
FS '.
Z
1?TH
_.�
1�OTH
LOTH ST NE gTy
NF AUBURN
-PIONEER
CDTIETERY
RTH ST
VICINITY MAP
DRAWING INDEX
REVISED SHEET NO. DESCRIPTION
9-20-04
G1
1 of
4
COVER
8-23-04
C1
2 of
4
SITE PLAN
8-23-04
C2
3 of
4
DETAILS & NOTES
9-20-04
C3
4 of
4
DETAILS
r
0
SITE INFORMATION
SITE ADDRESS:
1600 AUBURN WAY N.
PARCEL NUMBER: 000100-0008
ZONING: C3
LOT SIZE: 2649823 SQ. FT. - 6.08 ACRES
LEGAL DESCRIPTION:
LOCATED IN THE NORTHWEST QUARTER OF SECTION 7, TOWNSHIP 21 NORTH,
RANGE 5 EAST MORE PARTICULARLY DESCRIBED AS FOLLOWS:
A PORTION OF THE BRANNAN W-DC #37 THE 7.07 ACRES OF THE NORTH
1,056 FEET OF THE SOUTH 1,485 FEET OF THE WEST 610.5 FEET OF SAID
BRANNAN W-DC #37.
LESS THAT PORTION FOR ROADS AND STATE HIGHWAY PER RECORDING
NUMBER 9412151334 RECORDS OF KING COUNTY AUDITOR.
OWNER: PHIL BIVENS
AUBURN CHEVROLET-GEO INC
P.O. BOX 797
1600 AUBURN WAY N.
AUBURN, WASHINGTON 98071-0797
(253) 383-1600
APPLICANT: JEFF WELLM AN
INTERWEST DEVELOPMENT NW., INC.
1425 22nd STREET NW, SUITE E
AUBURN, WASHINGTON 98001-3334
(253) 939-9787
N
N
1 u-z3-u4 rtn �;.U_+.
REVIEW COMMENTS
0 9-20-04 PER C.O.A.
REVIEW COMMENTS
to
00
U CV
LOO,
rL a �' N
Wr)`�
LO � :: if
ZZF-
yF-
LIJ
UJI
Z V),__
(�7:
ZOO
WUZ
4
7-21-04 1
w
r7
r7
3 O
O
00
w
rL J � Z
-
W O
OO 3
O
00
W LL.CnLZ
Q
�¢L�
�o�m
Q
zv�Q
U
z
c/)
1--
PREPARED BY: JOSEPH J. DOMINCZYK, P.E.LLJ
o
z
ENGINEERING CONSULTANTS
NORTHWEST, INC.
CDo
w
35717 PACIFIC HIGHWAY SO.
z
a- C)
o
FEDERAL WAY, WA 98003
w
�
m
�
W
(253) 952-7797
CD
CD
_
CD
CD
z
:3--
0
cif
RECORD DRAWING CERTIFICATION
W m
a
(n
THESE DRAWINGS CONFORM TO THE
-, <
0
a
CONTRACTOR'S CONSTRUCTION RECORDS.
DATE
7-20-04
BY.
DRAWN
✓�-
TITL /POSITION:rtTr�2r9 __
B.S.O.
DESIGNED
B.S.O.
CONFIRMED BY CITY ATE:
fll7/0 11�4"._ APPROVED
PROJECT REF: GRA04-002 f7 J.J.D.
PROJECT NO.
THESE PLANS ARE APPROVED FOR 204424
CONFORMANCE WITH THE CITY OF AUBURN'S
ENGINEERING DIVISIO REQUIREMENTS. SHEET NO.
CALL BEFORE YOU DIG BONE CALL* APPROVED BY: G 1.0
UTILITY LOCATOR: 1-800-424-5555 DATE APPROVED:
1 Of 4 Sheets
P A I L S H C1 F-7 I t,
OSD/779
=++Immmw-
20 0 20
SCALE IN FEET
k
AUBURN CHEVROLET - GE01 INC. -STORM DRAINAGE IMPROVEMENTS
A PORTION OF
NW 1/4 SECTION 7, TOWNSHIP 21 N., RANGE 5 E., W.M.
CITY of nueuRN. Kric courm, wnsHxacron
Service Building
STREET
SITE PLAN
N.E.
1
1- = 20' C 1 C
Detail
Building
REASIONS
7-21-04 1
3 S
Z Ao
zd�m
w
J tz Z
CD 3 0
ww 00
o�zV) rn
cv
V) N MLAJ
N
r -�00
.. .
1
Z I DATE
_ 7-20-04
—
w DRAWN
I
_ B.S.O. EXISTING STORM DRAIN DESIGNED
MANHOLE
B.S.O.
i j7 o ff APPROVED
RECORD DRAWING CERTIFICATION
PROJECT REF: GRA04--0042' 7
J.J.D.
THESE DRAWINGS CONFORM TO THE
THESE PLANS ARE APPROVED FOR
PROJECT NO.
CONTRACTOR'S CONSTRUCTION RECORDS.
CONFORMANCE WITH THE CITY OFAUBURN`S
204424
ENGINEERING DIVISI REQUIREMENTS.
SHEET NO.
12141
BY.' DATE:3 LA25-
APPROVED BY.
C
1.0
TiRF. rPOSITION:
CONFIRMED BY CITI�'
DATE APPROVED:
2 Of
4 Sheets
OSD 1779
0
co
N
00
11
CONTINUOUS EXToi inrn nnk1nnrrr ni inn
PER APWA STAP
A.C. PAVEMENT
SECTION
AUBURN CHEVROLET - GEO, INC. - STORM DRAINAGE IMPROVEMENTS
A PORTION OF
NW 1/4 SECTION 7, TOWNSHIP 21 N., RANGE 5 E., W.M.
CITY OF AUBURN, KING COUNTY, WASHINGTON
COMPACTED BACKFILL
A.C. PAVING - CLASS B
2" COMPACTED THICKNESS FILTER FABRIC PROPOSED FINISH GRADE
ENTIRE TRENCH SEE SITE PLAN
E OF PAVING 2" COMPACTED THICKNESS
CRUSHED SURFACING TOP COURSE
F«
C)a0 0 000 $ 8" PVC PIPE (SDR 35) OR
I.E. 61, 8' N-12, PERFORATED
CN
ROCK.
SUB GRADE. LEVEL AND - 3/4" - 1WASHED DRAIN RAIN
COMPACT BEFORE PLACING 2.5' S' 2.5'
CRUSHED SURFACING TOP COURSE,
10'
SOIL STERILANT
EXTRUDED CURB SECTION TYP. PAVEMENT SECTION 2
1-1/2" = 1'-0" C2 C2 N.T.S.-
1C2
6"0 PVC PIPE
TO INFILTRATIO
FRAME AND LADDER OR STEPS
OFFSET.
OVERFLOW ELEVATION
TO PROVIDE DETENTION
AND OIL SEPARATION
EL. = 63.0
PIPE SUPPORTS
3" x .090 GAGE BOLT 8" OVERFLOW
OR IMBEDDED 2" IN WALL
AT MAXIMUM 3" SPACING.
I.E.
CLEANOUT GATE: EXISTING
A. SHEAR GATE, IRON BODY BRONZE
MTD. OLYMPIC FDY. STD. OR,
B. LIFT GATE, NO. C/C/1-LG,
CASCADE CULVERT INC. OR,
C. OTHER DEVICE APPROVED BY 77�
SOLID PLATE
(NO ORIFICE)
I I (OVERFLOW TO CITY SYSTEM)
ROUND SOLID COVER
MARKED "DRAIN" W/LOCKING
BOLTS UNLESS OTHERWISE
APPROVED BY ENGINEER
z STANDARD GALVANIZED
STEEL LADDER/STEPS
4
z CHAIN - 200# CAPACITY SLACK
WHEN GATE IS DOWN. FASTEN
CHAIN TO FRAME.
c� 8" OUTLET (TO INFILTRATION)
k I \ 61.60
48"0 PRE -CAST MANHOLE.
BRASS SCREW ON
CAP W/ RING
12" RADIUS CONCRETE
COLLAR FLUSH W/
FINISH GRADE
8" 0 PIPE
FIBRE JOINT PACKING
P.V.C. PIPE PER PLANS
1/8 BEND
P.V.C. WYE
2'-0"
CONTROL STRUCTURE DETAIL r 4 TRENCH CLEANOUT 5
N.T.S. C 1TC 27
N.T.S. C 1 C
INFILTRATION TRENCH DETAIL
CURB SHALL BE PLACED AS A
PART OF THE PAVEMENT -
CURBS TO BE ASPHALT CONCRETE
PAVEMENT PER SPECIFICATIONS-
8"
NTS
ASPHALT CONCRETE WEDGE CURB
N.T.S.
CONSTRUCTION NOTES
1. Asphalt Concrete Aggregate shall conform with WSDOT/APWA
Sections 5-04, 9-02 and 9-0.38 for "Class B" asphaltic
concrete.
2. Gravel Base shall conform to WSDOT/APWA Section 9-03.10.
3. Paving Asphalt shall comply with AASHTO M226 (ASTM D 3881) and
WSDOT/APWA Section 9-02.1 for Viscosity Grade AR-4000.
4. Tack Coat shall comply with WSDOT/APWA Section 9-02 for
"CSS-1 ".
5. Lane Marking Paint for striping shall conform to WSDOT/APWA
Section 8-22 for "no heat, instant dry" traffic paint.
6. Crushed Rock shall comply with WSDOT/APWA Section 9-03.9(3), 2
inch maximum, compacted to 97 percent maximum density, ASTM D-
1557.
7. Fill shall consist of native soil material conforming to the
following gradation:
Sieve Analysis Percent Passing by Weight
1/4" square 25% minimum
U.S. No. 200 5% maximum
The fill shall be free of various types of wood waste and
other extraneous material. Soil retained on a 1/4 inch square
sieve shall contain no more than 0.20 percent by weight wood
waste.
Dust Ratio: % Passing U.S. No. 200 = 2/3 maximum
Passing U.S. No. 40
8. All cuts and fills shall be made to grade as set by the
Contractor's surveyor.
9. All fills shall be made in lifts of 8" inches or less and then
compacted to 95% density before another lift may be added.
10. All areas shall be proof rolled before top courses are added
to the subgrade.
11. Top courses shall be placed according to WSDOT/APWA Section 4-
04.
12. Watering provisions must be in place at all times so no dust
becomes airborne.
13. Excess materials shall be removed from the site and be placed
at a legal disposal site.
14. Unsatisfactory materials for fill and trench backfill shall be
those defined as containing vegetable matter, peat, organic
clays and silts, sod, mulch and rubbish and those which are
excessively fine or moist not allowing adequate compaction.
15. General backfill shall consist of native materials obtained by
excavation. The material shall be non -organic soils generally
GRADING AND EROSION CONTROL NOTES
1. Within the City of Auburn, all required retention or
detention, sedimentation and erosion control facilities must
be constructed and in operation, prior to land clearing and/or
other construction activities, to insure that sediment -laden
water and storm drainage runoff does not impact the adjacent
properties or the natural drainage ways.
2. The detention, sedimentation (retention if infiltration system
is used) and erosion control facilities depicted on the
approved drawings are intended to be minimum requirements to
meet anticipated site conditions. Additional drainage and
erosion control facilities may be required as situations
warrant during construction. The implementation, maintenance,
replacement and additions to these control systems shall be
the responsibility of the permittee.
3. The temporary erosion control facilities, including all
perimeter controls, shall remain in place until final site
construction is completed and approval has been received from
the City.
4. Denuded areas and soil stockpiles must be stabilized according
to the following schedule:
From April 1 to October 31 all denuded areas at final grade
and all exposed areas that are scheduled to remain unworked
for more than 30 days shall be stabilized within 10 days.
From November 1 to March 31 all exposed soils at final grade
shall be stabilized immediately using permanent or temporary
measures. Exposed soils with an area greater than 5,000
square feet that are scheduled to remain unworked for more
than 24 hours and exposed area of less than 5,000 square feet
that will remain unworked for more than 7 days shall be
stabilized immediately.
STORM SEWER CONSTRUCTION NOTES
1. Catch Basin shall be Type II and shall comply with WSDOT/APWA
Sections 7-05, 9-05.15 and 9-12 and details shown on plans.
2. Non -Perforated Drain Pipe shall be PVC pipe conforming to
WSDOT/APWA Section 9-05.1(5). Non -Perforated Drain Pipe shall
be PVC pipe conforming to WSDOT/APWA Section 9-05.1(6),
3. The Contractor shall obtain any necessary storm line
connection permits from the City of Auburn, prior to
construction.
4. All storm drains within the development shall have stenciled:
"Drop No Waste - Drains" to either "Streams", "Wetlands" or
G 11
z
w
J
U
REVISIONS
6-23-04 PER C.O.A.
REVIEW COMMENTS
0
ZZ�
w�W
J
Z��
ZOO
LLJ U Z
a
7-21-04
w
r7
w r-)
V o
z _o
op
zQzo)
w z
Lj w O
03,��
Ln
000
Jwcnz�
I
wwC:)U)rn
rn
I
C-,jCn
� Q I of
Ln
ZC>
U C14
Q
roundwater as applicable. C3
5. Unless otherwise approved, all connections to existing sewer Z
main with new tees shall be done by the City of Auburn. The
Contractor shall be responsible for trench and pavement O
excavation, pipe installation, backfill and pavement W
restoration. O Q
I �
� Z
w �
(D m
> Q
_ w
U CD
Ctf
6 RECORD DRAWING CERTIFICATION W m
o Q
N.T.S. C 1 C2 THESE DRAWINGS CONFORM TO THE
CONTRACTOR'S CONSTRUCTION RECORDS. DATE
BY: DATE: '_ DRAWN
TITLE/POSITION:-C")J
CONFIRMED BY CITY' ATE. DESIGNED
>> 7� APPROVED
PROJECT REF: GRAO4-00 2
THESE PLANS ARE APPROVED FOR PROJECT NO,
CONFORMANCE WITH THE CITY OF AUBURN'S
ENGINEERING DIVISION E UIREMENTS. SHEET NO.
APPROVED BY
V)
H-
Z
LLJ
LW
O W
� O
� z
wCD
�3
Q J
z Q
w
0 0
0
U)
7-20-04
B.S.O.
B.S.O.
J.J.D.
204424
C 2.0
DATE APPROVED:
PI= ET 3 Or 5
3 Of 4 Sheets
OSDI779
m
rI
11
2'.
30" HEAVY DUTY MA
FRAME AND VENTED
ANCHORED SECURELY IN
PLAN VIEW
AUBURN CHEVROLET — GEO, INC. — STORM DRAINAGE IMPROVEMENTS
Baysaver
Baysaver
Maximum
Maximum
Separator
Manhole Sizes
Treatment
Treatment
Unit
(prim. x stor.)
(cfs)
(gpm)
1 /2K
48x48
1.1
494
Separator
n
30" HEAVY DUTY MANHOLE
FRAME AND VENTED COVER
ANCHORED SECURELY IN PLACE
CONNECTION
STM C-923
NOTE:
BAYSAVERS ARE TO BE INSTALLED WITH THE
STORM DRAIN SYSTEM AND WILL FUNCTION
AS SECONDARY SEDIMENT CONTROL DEVICES.
UPON COMPLETION OF SITE STABILIZATION,
EACH BAYSAVER SYSTEM SHALL BE FLUSHED
CLEAN & THE MANHOLES CLEANED OUT AND
REFILLED WITH CLEAN WATER.
A PORTION OF
NW 1/4 SECTION 7, TOWNSHIP 21 N., RANGE 5 E., W.M.
CITY OF AUBURN, KING COUNTY, WASHINGTON
FLOWABLE FILL
3/4" MI
GRAVEL BENE
SEPARATOR I
rA
SEPARATOR MANHOLE CONTAMINANT STORAGE MANHOLE
SECTION AA
BAYSAVER SEPARATION UNIT
N.T.S.
BAYSAVER MAINTENANCE
BAYSAVER SYSTEMS MUST BE INSPECTED AND MAINTAINED
PERIODICALLY. INSPECTION IS MADE BY CHECKING THE DEPTH
OF SEDIMENT IN EACH MANHOLE WITH A GRADE STICK OR
SIMILAR DEVICE. MAINTENANCE IS REQUIRED WHEN THE
SEDIMENT DEPTH IN EITHER MANHOLE EXCEEDS 2 FEET.
MINIMUM INSPECTION IS RECOMMENDED TWICE A YEAR TO
MAINTAIN OPERATION AND FUNCTION OF BAYSAVER.
MAINTENANCE CONSISTS OF THE FOLLOWING:
A. CONTAMINANT STORAGE MANHOLE
1. REMOVE THE ENTIRE VOLUME OF THE CONTAMINATED
WATER BY VACUUM TRUCK.
2. CLEAN THE MANHOLE WALLS AND FLUSH OUT THE
MANHOLE USING A HIGH PRESSURE HOSE AND REMOVE
FLUSHING WATER BY VACUUM TRUCK. MAKE CERTAIN
MANHOLE IS CLEAN.
B. PRIMARY SEPARATION MANHOLE
1. USING A SUBMERSIBLE PUMP, PUMP THE CLEAN WATER
FROM THE CENTER OF THE MANHOLE DIRECTLY INTO THE
EMPTY STORAGE MANHOLE UNTIL THE WATER LEVEL FALLS TO
1 FOOT ABOVE THE SEDIMENT LAYER.
2. REMOVE THE SETTLED SEDIMENT AND REMAINING WATER BY
VACUUM TRUCK.
3. CLEAN THE MANHOLE WALLS AND FLUSH OUT THE MANHOLE
USING A HIGH PRESSURE HOSE AND REMOVE FLUSHING WATER
BY VACUUM TRUCK. MAKE CERTAIN MANHOLE IS CLEAN.
4. CONTAMINATED MATERIAL REMOVED FROM THE MANHOLES
MUST BE DISPOSED OF RESPONSIBLY AND LEGALLY BY THE
OPERATOR OF THE VACUUM TRUCK.
mr
MEL. =65.30
NON -SHRINK GROUT
(TYP)
BAYSAVER INSTALLATION INSTRUCTIONS
1. EXCAVATION MUST PROVIDE ADEQUATE SPACE TO
CONNECT INLET AND OUTLET PIPES TO SEPARATOR MANHOLE
AND BAYSAVER UNIT. INSTALL PRECAST DROP STRUCTURES
ON SOLID GROUND AS VERIFIED BY A GEOTECHNICAL
ENGINEER.
2. VERIFY THE SUBGRADE ELEVATION AGAINST THE MANHOLE
DIMENSIONS AND CONNECTING STORM DRAIN INVERTS.
3. MAKING SURE THE BASES ARE LEVEL AND THE STORAGE
MANHOLE OPENINGS ARE ALIGNED WITH THE SEPARATOR UNIT,
INSTALL PRIMARY AND STORAGE MANHOLES. INSTALL
WATERTIGHT GASKETS ON BASE UNITS AND COAT WITH
LUBRICATING GREASE (IF REQUIRED). INSTALL ADDITIONAL
MANHOLE SECTIONS AS REQUIRED. SEAL LIFT HOLES WITH
NON -SHRINK GROUT.
4. BACKFILL BASE SECTIONS OF MANHOLES TO INVERT OF
STORAGE MANHOLE CONNECTING PIPES. USING APPROVED
BACKFILL MATERIAL, BACKFILL AND COMPACT IN 8 INCH
LIFTS. BACKFILL AND COMPACTION SHOULD BE MONITORED
BY A GEOTECHNICAL ENGINEER.
5. INSTALL BAYSAVER SEPARATOR UNIT AND CONNECTING
PIPES. SEAL ALL CONNECTING JOINTS AND INSTALL
SEPARATOR HDPE REDUCER/ADAPTER. CUT EXCESS LENGTH
OFF CONNECTING PIPES INSIDE STORAGE MANHOLE.
6. BACKFILL SEPARATOR UNIT AND MANHOLES. AREAS NOT
ACCESSIBLE TO COMPACTION EQUIPMENT MUST BE BACKFILLED
WITH 3/4" MINUS ANGULAR GRAVEL OR FLOWABLE FILL.
7. INSTALL AND SET MANHOLE COVER GRADE ADJUSTMENT
RINGS AS NECESSARY.
8. INSTALL AND SET MANHOLE FRAME AND COVER UNITS.
8" 0 1
GENERAL CONSTRUCTION NOTES
1. ALL WORK MUST BE DONE WITH REGARD FOR THE SAFETY
OF THE CONSTRUCTION CREW.
2. ALL WORK AND MATERIALS MUST COMPLY WITH
APPLICABLE STATE AND LOCAL REGULATIONS.
3. KNOW THE LOCATION AND DEPTH OF ANY UNDERGROUND
UTILITIES BEFORE EXCAVATION BEGINS.
)CER/ADAPTER
PIPE
T PIPE
RECORD DRAWING CERTIFICATION
THESE DRAWINGS CONFORM TO THE
CONTRACTOR'S CONSTRUCTION RECORDS.
BY DATE: ' -
TITLE/POSITION:—
CONFIRMED BY CITY. DATE:'3-/*a
REVISIONS
tS-ZJ-U4 NtK U.U.A.
REVIEW COMMENTS
0^ 9-20-04 PER C.O.A.
REVIEW COMMENTS
r7
0
0
ao
rn
rn
C.)
N
I� tf)
Q N
d JLO
N
p r7
� � LL
w
21 28 , 9 �w
�+t' IS
lDNAL E��"1
7-21-04
EXP 4-28-05
W
z � �
o
Z00
LLJ
J LiJ Z
CD 3: O
06
-
W LL_
I
00
I- N M��
I
'S Q f�
N
Z O d-
d N
Z
w
J
0
U
Z
O
LLj
CD Q
I �
� Z
LLJ
O m
W
= O
U O
c�
m
c
w �
0
DATE
F--
Z
L.L1
w
O
n
J
LLJ
U W
Z �
Q
O
7-20-04
DRAWN
B.S.O.
DESIGNED
B.S.O.
'� Z,y APPROVED
PROJECT REF: GRA04-C 5 /
THESE PLANS ARE APPROVED FOR
CONFORMANCE WITH THE CITY OF AUBURN'S
ENGINEERING DIVISIO REQUIREMENTS.
APPROVED BY:
DATE APPROVED:
J.J.D.
PROJECT NO.
204424
SHEET NO.
C
3.0
4 Of
4 Sheets
PF 1� Ii? SoEe:r 4 r S
0CM779
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
Cd
—� -
s—
—� —Cd—
Q
__iu—
C*O N
r�
00 — y —
CIS
ite
n ,
Z
Cd
w
a�
N
a
a
�
o
19, J 24'
10 Oversized Parking Stalls
10 Oversized Parking Stalls
1 1 -- 1 1 U�
d-
N
9' oM
10 Standard Parking Stalls
Site
Lighting
g g
r�
10 Double Stacked
Standard Parking Stalls
ICB I !
g I I I
9' 10 Standard Parking Stalls
5 CompaPRQPOSEnDg6 CURB PIER DETAIL #1 S EET C _
24'
LANDSCAPE STRIP (TYP) \-EXISTING FENCE
LOCATION
19
SCALE: 1:20
Power Trench
M Location
7
10 Standard Parking Stalls
10 Standard Parking Sty
CN
N
/ /
10 Standard Parking S
<r
N
9' a
16 Standard Parking Stalls
r+)
10 Standard Parking Stalls
Ligbting
CB
F
24 Standard Parking Stalls
EXISTING FENCE EAST PROPERTY LINE
LOCATION
r
Service
Building
8 Standard Parking Stalls
Body
Shop
Office
SPECIFICATIONS
INSTALLER SHALL OBTAIN AND PAY FOR ANY PERMITS NECESSARY FOR
INSTALLATION OF LANDSCAPE AND IRRIGATION WORK, AND COMPLY WITH
LOCAL CODES AND ORDINANCES RELATED TO SUCH WORK. ALL MATERIAL
AND WORKMANSHIP TO MEET OR EXCEED BEST ACCEPTED LOCAL STANDARDS.
HAVE UNDERGROUND UTILITIES LOCATED AND MARKED PRIOR TO START
OF WORK. GENERAL CONTRACTOR TO PREPARE SUB GRADES TO WITHIN 1/10 FT,
AT MINUS 6" IN PLANTED AREAS TO ALLOW FOR PLACEMENT OF 4" TOPSOIL
AND 2" BARK MULCH.
DO NOT PLACE TOPSOIL IN FREEZING WEATHER OR WHEN SITE IS IN WET
OR MUDDY CONDITION.
TOPSOIL DEPTH TO BE 4" IN ALL AREAS. SOME ADDITIONAL DEPTH MAY BE
NEEDED IN PLANTING ISLANDS AND AT INTERIOR OF PARKING LOT.
PLANTS TO BE OF NUMBER 1 GRADE, CONFORMING TO AAN STANDARDS FOR
NURSERY STOCK. DO NOT PLANT DURING EXCESSIVELY WET PERIODS OF IN
FREEZING WEATHER.
PLANT PITS FOR TREES TO BE TWICE AS WIDE AS ROOT BALL OR CONTAINER AND
6" DEEPER. SOAK ROOT BALLS WHICH HAVE DRIED. BROKEN OR LOOSE ROOT BALLS
WILL BOT BE ACCEPTED. PLANTING MIXTURE SHALL BE EQUAL PART NATIVE
SOIL FROM PLANT PIT AND SPECIFIED SOIL AMENDMENT. SLASH ROOTS OF
ROOT -BOUND CONTAINER -GROWN PLANT MATERIAL WHERE NECESSARY.
BACK FILL PLANT PITS HALF WAY AND APPLY AGRIFORM SLOW RELEASE FERTILIZER
TABLETS, AND WATER IN ALL PLANTS:
21 gm 20-10-5 4 TABLETS TREES
21 gm 20-10-5 3 TABLETS SHRUBS, 5 GALLON, B&B
21 gm TABLETS 2 TABLETS SHRUBS/ GROUNDCOVERS, 1 & 2 GALLON
5 gm TABLETS I TABLET GROUNDCOVERS, 4" POTS
FROM AN IRRIGATION SAUCER AT BASE OF EACH TREE AND AT BASE OF ALL TREES
AND SHRUBS IN WETLAND BUFFER AREA EQUAL TO WIDTH OF DRIP LINE OF PLANT
STAKE TREES w/ BVC LODGEPOLE PINE STAKES, USING 1 PER TREE. USE GALVANIZED
WIRE AND GARDEN HOSE TO PROTECT TREE TRUNKS.
APPLY 2" DEPTH FINE BARK TO PLANTED AREAS. FINISH GRADES IN PLANTED AREA
TO BE 1/2" - I" FROM TOP OF PAVEMENT OR TOP OF CURB.
SWEEP AND WASH SITE AT COMPLETION OF WORK. USE MECHANICAL/ POWER EQUIPMENT
IN STOCKPILE AREAS IF NEEDED.
MAINTENANCE IS THE RESPONSIBILITY OF OWNER. ALL MATERIAL AND WORKMANSHIP
TO BE GUARANTEED ONE YEAR.
ALL AREAS AT PARKING LOT ARE TO BE WATERED WITH AN AUTOMATIC SPRINKLER
SYSTEM. SYSTEM TO HAVE STATE AND LOCAL APPROVED BACKFLOW DEVICE,
WINTERIZATION FEATURES AND A RAINSWITCH. AN IRRIGATION SHALL BE PRG"TIDED FOR
APPROVAL BY THE CITY OF AUBURN WHICH MEETS ALL REQUIREMENTS AS SET FORTH BY
ORDINANCE.
SPRINKLER SYSTEM TO BE DESIGN/ BUILD. THE CONTRACTOR SHALL REVIEW JURISDICTIONAL
REQUIREMENTS FOR COMPLETE INSTALLATIONS OR SYSTEMS AND PROVIDE INSTALLATIONS)
WHICH COMPLY WITH ALL JURISDICTIONAL REQUIREMENTS.
PLANT LIST
CD QTY BOTANICAL NAME COMMON NAME SIZE/ SPACING
JM 10 Betula Jacquemond Jacquemonti Birch 1 1/2" - 2" caliper
@ 30' O.C.
TH-7 5 Thuja plicate' e % Excelsa Ceehrl . 1Y
'w .4 �G6IQlw �l1`s E/"rC a1o� - rGfr+ q:.1 � [�
GROUNDC�RS WE"e'r'" a -
SD 70% 3-WAY PERENIAL RYE Ceram Sod
15% RED FESCUE
15% CHEWING FESCUE
Detail
Building
16 Double Stacked ( i i ' 42 -5A+
Standard Parking Stalls 8 Standard Parking Stalls
IIIII I!I
CB Paint
FZ
20 Standard Parking Stalls Shop
WATER SOURCE
FOR IRRIGATION
i___LU -
PROPO ED 6" CURB PER DIfTAIL # SHE C2 (TO BE BIDDER DESIGNED)
MIN.
"1" STREET
TH- 7
N.E.
JM 10
Wq
EXISTING FENCE
LOCATION
PROJECT REF: GRA04-0022
THIS PLAN SHEET REFLECTS THE CITY OF
AUBURN'S MINIMUM LANDSCAPING
REQUIREMENTS.
APPROVED BY.
DATE APPROVED:
►r
w
I�
a,
M
N
M
M
OO
CIO
^O
�
Q
�
z
W
0
W
V
SHEET TITLE:
LANDSCAPE
DRN BY: Larry Guck
JOB NO: 04-125
DATE: 8/3/04
L 1 *0
PF— iIz sE'r--GT
OS D 1779