HomeMy WebLinkAbout05D178350.49
tar
�0.74 \ I
jj1 I
L� o
X. WH
EX. 36" I IE 43.55 (N)
STORM IE 43.45 (S)
so, fs
I 1 sr.,a
LOCATE
EPHONE �9 g0.92
250. -2 50 68
JNI k., I Wi 69X
V
�O
REMOV z
SIDEWAL
� I
FILTER
FENCE
i ?SPE COA
M;TlDTL
' �EV-6
CIE 4.73
IE 4.83
Imo- STD DTL DEV-8
REMOVF TREE
=0 t e
2�.as-- .� 6) REMOVE 5
51.26
51.38
l +
51.71
12 TO
so:«
51.53
ST CB + •.
REMOVE -
SIDEWALK
.92
50.97
EXIST.
DAYCARE
50.50
S . CONC.
1. 96.77 50.46 50.23
5. 7
5D81 REMOVE 50.27
49.
ASPHALT REMOVE
50.73 TREE
s .a
+
50.09
REMOVE
,. ;""' 50.60 ' S D3 � ,_ SEE NOTE
51.69 s,. e
,23
TREE
/ 50.46 50,30
51.27
•
I
48:84
4"_..75
FK R FENCE
PER CITY OF AUBURN
DEV-6
II
1 N EIT
49 18
49.03 \
20'
50.24
48.89
6!
�)
1
CENTER
0&?4�68 .28
4i
I 45.60
®
�' /
5,.14 56
I
50.70 50.49
I
5043
54.16 A 35
+ 55pp 44�y5
50.2+J +
49.51
I
'
50.52
(. '�-4U�.^
5.1..22
S,.M - 53.. /
�
®
50,36 REMOVE
49.0
EX
EXST
I^M
1.26
52.02 1.30
CONC.
05
DI I
SLAB
OFFICE
I.) t^O
- 5,.572+
49
R 49.90 I
4 150. 00.07
10.33
10.33
1 I CDN
/
SO.iJ
.26
I
I cn
EXST
t l
.. , ,tV
® .00
I MODULAR
06°
: CAUTION EXISTING
%''
1-40FFICE
° 1
I I
1.00
51.09 SANITARY S7DE°gSEWER
CN
I
r
I
/
'....�...�....�..� -:. --
�50.06
$509
+
48.92
�Yd I
Q I
y, 5D.35
.10 .i6
50
I ~
50.41 5D.4g 50.55
..► � cLAyrJ
50.17
j*
50.73 50. x 30
90.76 50 } OFFICE
49.42
I-
1
30,7
5,14_____-
x
I
I
41 .z I
t
S 89415'50" E I
691.2T
50.68
NOTE: REMOVE GRAVEL, GRADE TOWARDS
PARKING LOT, HYDROSEED EXPOSED AREA.
T. E. S. C. DEMO P LAN '1901b,
1" _ �, NORTH
GRADING NOTES
1. THE CONTRACTOR SHALL GRADE THE SITE TO THE GRADES SHOWN PER
THE DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR IS
RESPONSIBLE FOR FOLLOWING THE REQUIREMENTS OF THESE DOCUMENTS
REGARDING ALL PAVING SECTIONS, CONSTRUCTION METHODS, AND OTHER
SOIL RELATED REQUIREMENTS.
2. THE CONTRACTOR SHALL SUBMIT A HAUL ROUTE PLAN TO THE CITY OF
AUBURN FOR REVIEW AND APPROVAL PRIOR TO PROCEEDING WITH ON -
SITE WORK.
3. THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY,
TO REDUCE DUST EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY.
THE CONTRACTOR SHALL ALSO SWEEP ALL AFFECTED PUBLIC ROADS, AS
NECESSARY, TO REMOVE MUD DEPOSITED AS A RESULT OF PROJECT
CONSTRUCTION ACTIVITY. THESE ACTIONS WILL BE GOVERNED AND
DIRECTED BY THE BUILDING OFFICIAL.
+
48 ,0
CONSTRUCTION SEQUENCE
1. SCHEDULE AND ATTEND A PRE -CONSTRUCTION MEETING WITH
THE CITY OF AUBURN OFFICIALS.
2. ESTABLISH THE CLEARING AND GRADING LIMITS.
3. PROTECT EXISTING CATCH BASIN INLET PER
AUBURN STD. DTL. DEV-8. INSTALL FILTER FENCE.
4. BEGIN REMOVAL OF ASPHALT CONCRETE
AND TREES.
5. BEGIN GRADING AND CONSTRUCTION OF UTILITIES
AND PAVING. CONSTRUCTION WITHIN CITY RIGHT OF WAY
SHALL BE LIMITED TO 15 DAYS
6. PROTECT ALL NEW CATCH BASIN INLETS PER AUBURN STD. DTL.
DEV-7.
® 7. REMOVE ALL T.E.S.C. MEASURES, ONLY AS APPROVED BY THE
CITY OF AUBURN AND THE ENGINEER UPON SUBSTANTIAL COMPLETION
OF CONSTRUCTION.
8. REMOVE ALL SEDIMENT FROM STORM STRUCTURES UPON
COMPLETION OF PROJECT.
W
LI w
00
ZI
+ I48.54
i
NCO
L�
a^^o
Z
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES, WHETHER SHOWN ON
THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE
THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION.
THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555
AND THEN POTHOLING ALL EXISTING UTILITIES AT LOCATIONS
OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER
OR NOT CONFLICTS EXIST, LOCATIONS OF SAID UTILITIES AS
SHOWN ON THESE PLANS ARE NOT GUARANTEED AND ARE
SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR,
THE CONTACTOR SHALL CONSULT RUPERT ENGINEERING, INC.
TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH
CONSTRUCTION.
RECORD DRAWING CERTIFICATION
THESE DRAWINGS CONFORM TO THE
CONTRACTOR'S CONSTRUCTION RECORDS.
BY; DATE:
CONFIRMED BY CITY: DATE:
REQUIREMENTS FOR EXPOSED
SOIL STABILIZATION
1. DENUDED AREAS AND SOIL STOCKPILES MUST BE STABILIZED
ACCORDING TO THE FOLLOWING SCHEDULE OR EXCEPTED IN THE FIELD
WHEN IN THE JUDGEMENT OF THE BUILDING OFFICIAL OR THE
OFFICIAL'S REPRESENTATIVE, SUCH SCHEDULE IS NOT WARRANTED:
FROM APRIL 1 TO OCTOBER 31, ALL DENUDED AREAS AT FINAL
GRADE AND ALL EXPOSED AREAS THAT ARE SCHEDULED TO REMAIN
UNWORKED FOR MORE THAN 30 DAYS SHALL BE STABILIZED WITHIN
10 DAYS.
FROM NOVEMBER 1 TO MARCH 31, ALL EXPOSED SOILS AT FINAL
GRADE SHALL BE STABILIZED IMMEDIATELY USING PERMANENT OR
TEMPORARY MEASURES. EXPOSED SOILS WITH AN AREA GREATER
THAN 5000 SQUARE FEET THAT ARE SCHEDULED TO REMAIN
UNWORKED FOR MORE THAN 24 HOURS AND EXPOSED AREAS OF LESS
THAN 5000 SQUARE FEET THAT WILL REMAIN UNWORKED FOR MORE
THAN 7 DAYS SHALL BE STABILIZED IMMEDIATEDIATELY.
2. STABILIZATION METHOD: HYDROSEEDING & MULCHING PER THE
FOLLOWING:
A. TIME OF PLANTING - DURING THE TIME PERIOD BETWEEN APRIL 1
THROUGH JUNE 30 AND SEPTEMBER 1 THROUGH OCTOBER 31.
(NOTE: IF PLANTING BETWEEN JULY 1 AND AUGUST 31,
IRRIGATION MAY BE REQUIRED. IF PLANTING BETWEEN NOVEMBER
1 AND MARCH 31, MULCHING WILL BE REQUIRED IMMEDIATELY
AFTER PLANTING.)
B. SEEDBED PREPARATION - THE SEEDBED SHOULD BE FIRM, BUT NOT
COMPACT, WITH A FAIRLY FINE SURFACE FOLLOWING SURFACE
ROUGHENING. SURFACE ROUGHENING SHOULD BE DONE AT RIGHT
ANGLES TO THE SLOPE AND PREFERABLE "CAT WALKED" UP SLOPE.
C. FERTILIZATION - AS PER SUPPLIER'S RECOMMENDATIONS.
DEVELOPMENTS ADJACENT TO WATER BODIES AND WETLANDS MUST
USE NON -PHOSPHOROUS FERTILIZER.
D. SEEDING - APPLY THE FOLLOWING MIXTURE TO THE PREPARED SEED
BED AT A RATE OF 120 LBS/ACRE:
PROPORTIONS PERCENT PERCENT
NAME BY WEIGHT PURITY GERMINATION
REDTOP(AGROSTIS ALBA) 10% 92 90
ANNUAL RYE (LOLIUM MULTIFLORUM) 40% 98 90
CHEWINGS FESQUE 40% 97 80
(RESTUCA RUBRA COMMUTATA)
(JAMESTOWN,BANNER, SHADOW OR KOKET)
WHITE DUTCH CLOVER 10% 96 90
(TRIFOLIUM REPENS)
E. "HYDROSEEDING" APPLICATIONS WITH APPROVED SEED -MULCH -
FERTILIZER MIXTURES MAY ALSO BE USED.
F. MAINTENANCE - SEEDING SHOULD BE SUPPLIED WITH ADEQUATE
MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN
ABNORMALLY HOT OR DRY WEATHER, OR ON ADVERSE SITES. WATER
APPLICATION RATES SHOULD BE CONTROLLED TO PREVENT RUNOFF.
INADEQUATE AMOUNTS OF WATER MAY BE MORE HARMFUL THAN NO
WATER.
z ,
r
..
M
M
ra
I
VfJ
L
I
N
I1�
I�
v
O
,
act
p
00
z
@
<
3
00
V)
o
W
W
N
n n n
�
_Z
Z
Z
W
r
v
ba
3
.2
v
J
>
O
�
_
Z
3
O
U
L..J
W~
_
c
C
z
1
V
c
4... f
zz
::D
U
c
00
rn
o
`t
co co
N
W
w
U
U
v�
Q
aN-
w
//5-
w
z
0
z
0
05
U)
®
m
a
M
I
f
i
PROJECT REF: GRA0020-97
DATE 10/3/97
THESE PLANS ARE "APPROVED" FOR
DRAWN
CONFORMANCE WITH THE CITY OF AUBURN
A.M.
ENGINEERING DIVISION'S REQUIREM
�-� ENTS 3�,71�g
CHECKED
L.K.
Approved By. 'r
JOB NO.
97109
Date Approved: /
SHEET NO.
C2
50.0 BEG
49.0 END
45.4 BEG
44.4 END
3* DESIGN DEPTH DURING
F6 MONTH, 24 HR STORM
1' MIN. FREEBOARD
BOTH SIDES -,
HYDROSEED OR SOD BIOSWALE GRASS SEEDMIX
(MAINTAIN 6- GRASS
HEIGHT AT SCALE)
BIOSWALE
N.T.S.
36'
50.88
t.61
4' MIN. TOPSOIL
EROSION CONTROL BLANKET
(JUTE NETTING OR APPR'D EQUAL)
HYDROSEED OR SOD
BIDVN&f GWS SEMMIX
(FOR WSWALE SLOPES < 1 .0%)
20 X WM HAAGRASS (DIESCHAMI"AA CAESPITOSA)
20 % AMERICAN SLOUGHGRASS (BECHMANM SYZIGACHNE)
20 % WESTERN MAMOMS (GLYCERLA SPS)
20 X REDTOP (AGROSTIS ALBA)
20 % FOWL BLUEGRASS (POA PAULUSTRIS)
EACH SEED TYPE TO HAVE 92-95 % PURITY AND
8C% MIN. GERMWTION.
APPAMM (PER ACRE):
2-3 LB. SEED MIX
435 LB. 10-20-20 (N-P-K) NON-PHOSPHOM, FERTILIZER
1500-2000 LB. WOOD CELLULOSE FIBER MULCH
NOTE: BIOSWALE TO BE FULLY ESTABLISHED PRIOR
TO INTRODUCTION OF STORMWATER RUNOFF.
IRRIGATE IF NECESSARY.
MIRAFI 14ON
�GEOTEXTILE FABRIC
1=1 it ' ;4 11-
EL. 46.5 LI 7= I
=111OQ 0 Q( u
0 0
00 0 00
00 0 0 12m SLOTTED PVC
20
o T
EL. 43.5 0
o
00 0
EL. 43.0 1140 071-1,
lo' 11 3/4' TO 1 1/2'
WASHED ROCK
50
NFILTRATION TRENCH
ml
NOT TO SCALE
NOTE. HIGH GROUND WATER ELEVATION
IS 42.0
+ 4992
S W15V" E
691.27-
A STQRM & GRADING PLAN
30*
•
ADJUSTMENT 9"
(4m MIN., 12m MAX.)
OFFSET TOP SLAB
8* CAP RUBBER GASKET
SHORT NIPPLE (LUBE-
BOTH ENDS)
A.C. OR G.P.K.-
MANHOLE ADAPTER
Qa = 0.23 CFS
6 MO.-24 HR
STORM
lid —I I IT-ii I I I T-,,-r I,
I
STANDARD GALV.
STEEL LADDER/
STEPS
12* BY PASS OVERFLOW
6m IE 46.70
E 46.50
L .1 — I 1 10* HDPE
8m PVC SDR 3
8"x 8'x 8" PVC TEE
RUBBER GASKET JOINTS 8* \1_48' TYPE tI-C CATCH BASIN
RIMER GASKET PLUG W/ 2 .91" 0 ORIFICE CONTROL STRUCTURE
BIOSWALE INLET CONTROL STRUCTURE
C� N.T.S.
4854
� 48
47.90
UTILJTY QUNl LIU I _.NIA
L
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION,
DIMEN", AND DEPTH OF ALL EXISTING UnUTIM WHETHER SHOWN ON
THESE PLANS OR NOT, By POTHOLING THE UTkITIES AND SURVEYING THE
THE HORIZONTAL AND VERTCk LOCATION PRIOR TO CONSTRUCTION.
THIS SHALL INCLUDE CALLING UTILITY LOCATE 0 I-BDO-424-5555
AND THEN POTHOLING ALL EXISTING UTILITIES AT LOCTIONS
OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER
OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS
SHOWN ON THESE PLANS ARE NOT GUARANTEED AND ARE
SUBJECT TO VARIATION. IF CONFLICTS SHOO OCCUR,
THE CONTACTOR SHALL CONSULT RUPERT ENGINEERING, INC.
To RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH
CONSTRUCTION.
0
STORM CATCH BASIN SCHEDULE
•
=0�0005T#74=
50.00
� La
Le
g
uj
Ifi
$0.00
DAM
By CITY. DATE:
"I"
PROJECT REF: GRA0020-0
THESE PLANS ARE "APPROVED" FOR
CONFORMANCE WITH THE CITY OF AUBURN 9=WW\
ENGINEERING DIMSION'S REQUIREMENTS 31-n I cm
ja
Dcft AWovo&
ril
00
_j
gg
IK
W
w
S
Z
Zr-
3
0
LLJ
0
z
�
n
<
_j
ry
LAJ
00
0
Z'
ry
C;6
:2
cl�
0
LLJ V)
0