Loading...
HomeMy WebLinkAbout05D1784W VF x XXX X 14 W- - - - - - - - - - - - - - - • `----_OF THE ROAD AND CONVEYED TO THE SURFACE CONTROL,PONDS. E­4 NJ E­4 124 ELEV. EXISTING ENTRANCE ROAD Clrf OF AUBURN BERM MARK 22-1 *)C CHISELED INTO SOUTH-EAST CORNER OF BRIDGE__OVERSTUCK RIVER,-- -__ A/ %,_" ON *Jr -XIBICET 40 ,L Amm Akc Aaraurb JW#iAwk AA#r Amu AtesWor dA#&;lo0y UAL, Ar jW jrm*�Aw"i,, NOTE: HEIGHT OF FILL IS VARIABLE TO MAINTAIN CONSISTENT HEIGHT FROM STUCK RIVER ROAD VANTAGE POINT. % 6 x 'k EXISTING CONTROL POND tt TYPICAL HYDROSEED MIX 6' TOP STUCK RIVER DRIVE PROPERTY 12 M ENGINEERS CALCULATIONS AND LINE LIMITATIONS ON BLOCK RETAINING WALL TYPICAL HYDROSEED MIXS 2 BUILDING 4' STUCK RIM DRIVE Engineer's stamp: 7 tv 4 000 t PROPERTY LINE NEW BERM WITH CONCRETE BLOCKS AT SHOP YARD LOCATION 'SECTTON A TOP 0 E- 2 ECTION B lyl (Flo- 9M7 LAVOW &Z-ol ),4k',/fffLJk_,, Al*'jlVft&0_l x4ftils;v 40=0 CADFILE NAME: GROUP205 SOUNDBRM.DWG PROJECT REF: M.A. M.A. SEGALE INC. o! Record Drawing Certification 7 These drawings conform to the Contractor's ` construction records. These plans are approved for conformanceL TUKWnA, WASHINGTON (2m) e75—=o with the City of Auburn's Engineering Division INC. WAm 1" = 50'- 0" MUVW Iff: MGM requirement-,. DA 8/7/97 nmUD-. 8/7/97 By: Date: TiUe/Position: Confirmed by City- Date: Approved By- Z_Z�a�_ V Date Approved: Z" T=: BAYDO PIT SIM WrLit DRkwmG "mmm MITIGATION BERM DETAIL AT EQUIP. 205-97015 MAINTENANCE SHOP BLDG.