Loading...
HomeMy WebLinkAbout05D1865A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST, W.M. LAKELAND SOUTH N� DIV. 3 PHASE 2 OWNER/DEVELOPER : THE LAKELANID IDOMPANY (ROAD AND UTILITIES) PIERCE COUNTY, W A . 2223 112TH AVE. NE. CIVIL ENGINEER SURVEYOR GEOTECHNICAL ENGINEER ENVIRONMENTAL ANALYSIS LEGAL DESCRIPTION BELLEVUE, WA 98004 PHONE (206) 453-0496 FAX (206) 453-6767 PACIFIC EN0111*1PoIIG DESIGN, INC. 130 ANDOVER PARK E. SUITE 300 SEATTLE, WA. 98188 PHONE (206) 431-7970 FAX (206) 431-7975 BOYD & ASSOCAITIES 13039 6TH AVE. SOUTH BURIEN, WA. 98168 PHONE (206) 244-2869 FAX (206) 431-9110 ASSOCIA10 EARTH SC04M 724 ERICKSON AVE, N.E. /204 BAINBRIDGE ISLAND, WA 98110 PHONE (206) 780-9370 FAX (206) 780-9438 LAND STRATEGIES 446 SE CRESENT PLACE CLINTON, WA. 98236 PHONE (360) 341-1767 THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 20 NORTH, RANGE 5 EAST, W.M. AND THAT PORTION OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 20 NORTH, RANGE 5 EAST, W.M. IN PIERCE COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SECTION 6. TOWNSHIP 20 NORTH, RANGE 5 EAST, AS SHOWN IN RECORD OF SURVEY NUMBER 8807280259; THENCE ALONG THE NORTH LINE OF SAID SECTION N. 88'34'43" W. A DISTANCE OF 19.43 FEET TO THE NORTHWEST CORNER OF PN:RCE COUNTY LARGE LOT SUBDIVISION NUMBER 670; THENCE CONTWL04G ALONG SAID NORTH UNE N. 88'34'43' W. A DISTANCE OF 758.61 FEET TO A POINT ON CURVE; THENCE ON A CURVE TO THE RIGHT WITH A 1030.00 FOOT RADIUS. THE CENTER OF WHICH UES N. 73'41'20" W., THROUGH A CENTRAL ANGLE OF 00'56'40", AN ARC DISTANCE OF 16.98 FEET; THENCE CONTINUING ON A CURVE TO THE RIGHT WITH A RADIUS OF 430.00 FEET, THE CENTER OF WHICH UES N. 72'44'40" W., THROUGH A CENTRAL ANGLE OF 37'44'40", AN ARC DISTANCE OF 28127 FEET; THENCE S. 55100'00" W. A DISTANCE OF 166.23 FEET; THENCE S. 53'05'27" W. A DISTANCE OF 150.06; THENCE S. 55'00'00" W. A DISTANCE OF 206.98 FEET; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 35.DO FEET, THE CENTER OF WHICH UES S. 3500'00' E., THROUGH A CENTRAL ANGLE OF 84'17'46", AN ARC DISTANCE OF 51.49 FEET; THENCE S. 2917'46" E. A DISTANCE OF 10.16 FEET; THENCE ON A CURVE TO THE RIGHT WITH A RADIUS OF 771.00 FEET, THE CENTER OF WHICH UES S. 60'42'14" W.. THROUGH A CENTRAL ANGLE OF 14*31*22", AN ARC DISTANCE OF 195.43 FEEET; THENCE S. 14'46'2e E A DISTANCE OF 1430.60 FEET TO THE TRUE POINT OF BEGINNING; THENCE N. 75'13'36" E. A DISTANCE OF 59.23 FEET; THENCE ON A CURVE TO THE RIGHT WITH A RADIUS OF 1970.00 FEET, THE CENTER OF WHICH UES S. 14'4624" E.. THROUGH A CENTRAL ANGLE OF 4'46'24", AN ARC DISTANCE OF 164.12 FEET; THENCE N. 80'00'00" E. A DISTANCE OF 500.00 FEET; THENCE N. 1000'DO" W. A DISTANCE OF 393.00 FEET; THENCE N. 4170'00" E. A DISTANCE OF 240.00 FEET; THENCE N. 57-MOO" E. A DISTANCE OF 150.00 FEET TO THE SOUTHWEST CORNER OF GOVERNMENT LOT 4 OF SECTION 5 AS SHOWN ON PAGE ONE OF RECORD OF SURVEY 8807280259; THENCE N. 89'54'50" E. ALONG THE SOUTH UNE OF GOVERNMENT LOTS 3 AND 4 OF SAID SECTION 5 A DISTANCE OF 1638.38 FEET; THENCE S. 0326'36" W. A DISTANCE OF 48.22 FEET; THENCE S. 31'Ot'58' W. A DISTANCE OF 20.64 FEET; THENCE S. 2416'49' E. A DISTANCE OF 21.34 FEET TO A POINT ON A CURVC; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 100.00 FEET, THE CENTER OF WHICH BEARS S. 38'55'41" E.. THROUGH A CENTRAL ANGLE OF 127'34'07", AN ARC DISTANCE OF 222.65 FEET; THENCE S. 7629'49" E. A DISTANCE OF 18.99 FEET TO A POINT ON A CURVE; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 100.00 FEET, THE CENTER OF WHICH LIES S. 7400'49" E., THROUGH A CENTRAL ANGLE OF 7526'30", AN ARC DISTANCE OF 131.67 FEET; THENCE S. 13'49'52" E A DISTANCE OF 39.50 FEET; THENCE S. 60'W23" E. A DISTANCE OF 6&47 FEET; THENCE S. 24W36' E. A DISTANCE OF 20.88 FEET. THENCE S. 4531'31' E. A DISTANCE OF 6&43 FEET; THENCE S. 63'4i35' W. A DISTANCE OF 44.14 FEET; TENCE S. 0118'19' E. A DISTANCE OF 111.57 FEET; THENCE S. 2917'48" E. A DISTANCE OF 5.34 FEET; THENCE S. 0411'05' W. A DISTANCE OF 17.53 FEET TO THE SOUTH UNE OF THE NORTH HALF OF THE SOUTH HALF OF SAID NORTHWEST QUARTER; THENCE S. 89'32'03' W. ALONG SAID SOUTH LINE A DISTANCE OF 1182.52 FEET TO THE WEST LINE OF THE SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SAID NORTHWEST QUARTER; THENCE S. 02TV23' W. ALONG SAID WEST LINE A DISTANCE OF 673.91 FEET TO THE SOUTH LINE OF SAID NORTHWEST QUARTER; THENCE S. 8909'03' W. ALONG SAID SOUTH UNE A DISTANCE OF 656.14 FEET TO THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF SAID SECTION 6; THENCE N. 88'34'36' W. ALONG THE SOUTH UNE OF SAID NORTHEAST QUARTER A DISTANCE OF 520.00 FEET; THENCE N. 021Y00' W. A DISTANCE OF 143.00 FEET; THENCE �. OW39'24' W. A DISTANCE OF 229.04 FEET; THENCE S. 77'00'00 W. A DISTANCE OF 349.00 FEET; THENCE N. 14'46'24" W. A DISTANCE OF 265.00 FEET; THENCE N. 7513'36" E. 82.00 FEET TO THE TRUE POINT OF BEGINNING. a • • 11 ■ LAKELAND SOUTH DIVISION 2 PHASE I LAKELAND SOUTH COMMUNITY CENTER ORIGINAL PLAT BOUNDARY FOR DIVISION 3 NORTH 57TH ST. SE OLIVE WAY FUTURE LAKELAND SOUTH DIVISION I 62ND ST. S.E. TO BE CONSTRUCTED CONCURRENTLY WITH PHASE 1 WORK. EXCEPTION PARCEL SE VICINITY MAP AUBURN � u 16) 1ST AK' M AUBURN O t ALGONA „ y � a Y u""0501 RD AUBURN � M PACIFIC KING ky sm Ar< K e COUNTY i r RWc couNtt * NNID couNtt q w P&RCE COUNTYAIN ncRc,: caett e € R 81N ST E SITE PIERCE COUNTY FOR SANITARY SEWER ONLY PROJECT REF: FAC D018-97 These plans are approved for conformance with the City of Auburns Engineering Division requirements Approved By. Date Approved: FOR WATER ONLY Record Drawing Certification These drawings conform to the Contractor's construction records. By. Date: Title/Position: Confirmed by City. Date: ORIGINAL PUT BOUNDARY FOR DIVISION 3 THESE PLANS ARE HEREBY APPROVED FOR CONFORMANCE WITH THE CITY OF BONNEY LAKE PUBLIC WORKS STANDARDS AND SPECIFICATIONS. APPROVAL IS VAUD FOR A PERIOD OF 12 MONTHS FROM THE DATE OF SIGNATURE CITY a191NEfa1 DATE i NAD27 (City of Auburn) USGS (Pierce County) BENCHMARK Brass Mon. at SE corner of B.N.R.R. Bridge spanning the Stuck (White River). (Referred to under Pierce County Datum as B.M. 0-11 (USGS) Std. Disk stamped "100 1913" Elevation=100.02 (City of Auburn) Elevation=100.049 (Pierce County) TB.M. Center of Sanitary Sewer Manhole Lid 5• North and 6' West intersection of Evergreen Ay S.E. and 58th PI. S.E. Elevation 572.50 (Auburn) SHEET INDEX SHEET C1 COVER SHEET SHEET C2 GENERAL NOTES (ROAD & STORM) SHEET C3 GENERAL NOTES (SANITARY & WATER) SHEET C4 COMPOSITE UTILITIES / KEY MAP SHEET C5 COMPOSITE UTILITIES / KEY MAP SHEET C6 ROAD & STORM DRAINAGE PLAN (ROAD A) SHEET C7 ROAD & STORM DRAINAGE PLAN (ROAD A) SHEET C8 ROAD & STORM DRAINAGE PLAN (ROAD A) SHEET C9 ROAD & STORM DRAINAGE PLAN (ROAD A) SHEET C10 ROAD & STORM DRAINAGE PLAN (ROAD A) SHEET C11 ROAD & STORM DRAINAGE PLAN (ROAD L) SHEET C12 ROAD & STORM DRAINAGE PLAN (ROAD L) SHEET C13 ROAD & STORM DRAINAGE PLAN (ROAD S) SHEET C14 ROAD & STORM DRAINAGE PLAN (ROAD S) SHEET C15 ROAD & STORM DRAINAGE PLAN (ROAD T) SHEET C16 ROAD & STORM DRAINAGE PLAN (ROAD T) SHEET C17 ROAD & STORM DRAINAGE PLAN (ROAD U) SHEET C18 SANITARY SEWER & WATER PLAN (ROAD A) SHEET C19 SANITARY SEWER & WATER PLAN (ROAD A) SHEET C20 SANITARY SEWER & WATER PLAN (ROAD A) SHEET C21 SANITARY SEWER & WATER PLAN (ROAD A) SHEET C22 SANITARY SEWER & WATER PLAN (ROAD A) SHEET C23 SANITARY SEWER & WATER PLAN (ROAD L) SHEET C24 SANITARY SEWER & WATER PLAN (ROAD L) SHEET C25 SANITARY SEWER & WATER PLAN (ROAD S) SHEET C26 SANITARY SEWER & WATER PLAN (ROAD S) SHEET C27 SANITARY SEWER & WATER; PLAN (ROAD T) SHEET C28 SANITARY SEWER & WATER �PLAN (ROAD T) SHEET C29 SANITARY SEWER & WATER PLAN (ROAD U) SHEET C30 DETAILS SHEET C31 PIERCE COUNTY STANDARD DETAILS SHEET 032 PIERCE COUNTY STANDARD DETAILS SHEET C33 BOUNDARY MAP SHEET C34 INTERSECTION CHANNELIZATION PLAN- (62ND ST SE & LAKELAND HILLS WAY SE) APPROVED :✓ 1� I•48 DIRECTOR OF PUB TC KS DATE N O W U Q (Wj a W W 00 W m N N 0 Z ZSLL Q �a� J a.0 WN Y rW CjJ� �zlcq 10 F C4 1 8 0, PROJECT NO. LEL DRAWN BY 6-10-97 ISSUE DATE 11-24-97 SHEET REVISION cl P4 Y 5 ■ o PACIFIC ENGINEERING DESIGN INC.o CIVIL_ ENGINEERING AND REVISED SHEET INDEX 7-03-97 LEL REVSED PER CLRT/T/AUeURN/BGNNET IA6[ RFA11.11NC5 /-arY/ ItL 0 REVISED PER LAKELAND/PIERCE COUNTY REDLINES 10-07-97 LEL REVISED FIRE HYDRANT LOCATIONS 10-27-97 LEL 0 PLANNING CONSULTANTS REVISED ROAD NAMES/SHEET INDEX 11-24-97 LEL OsDiS(os PIERCE COUNTY GENERAL NOTES (PRIVATE DEVELOPMENT) 1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LATEST STATE OF WASHINGTON, DEPARTMENT OF TRANSPORTATION STANDARDS SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND PIERCE COUNTY PUBLIC ROAD STANDARDS. 2. INSPECTION OF THE STORM DRAIN SYSTEM MUST BE CALLED FOR BEFORE ANY BACKFILL IS PLACED FOR THE DRAIN SYSTEM. 3. CATCH BASINS SHALL BE TYPE 1 WITH B-2A FRAME AND GRATE UNLESS OTHERWISE NOTED. 4. IF ADEQUATE INSPECTION IS NOT CALLED FOR BEFORE COMPLETION OF THE ROADWAY CONSTRUC710111, IT MAY PE NECESSARY FOR CORE DRILLING AND TESTING TO BE PERFORMED TO ASSURE AN ACCEPTABLE QUALITY OF ROADWAY. WHEN CORE DRIWNG IS FOUND TO BE NECESSARY, THE DEVELOPER WILL BE BILLED AND HELD RESPONSIBLE FOR ALL COSTS INCURRED. 5. IT WILL BE THE DEVELOPER'S OR HIS AGENT'S RESPONSIBIUTY TO CONTACT ALL UTILITY COMPANIES IN ORDER TO ASSURE THAT ALL RUES, PIPES, POLES, AND OTHER APPURTENANCES ARE PROPERLY LOCATED AND THEIR INSTALLATION IS COORDINATED WITH THE ROAD CONSTRUCTION. ALL UTILITY RELOCATION WORK SHALL BE AT THE EXPENSE OF THE DEVELOPER AND MUST BE IN ACCORDANCE WITH STANDARDS ADOPTED BY THE COUNTY PRIOR TO ROAD ACCEPTANCE. 6. CULVERT PIPE SHALL BE 12-INCH CONCRETE CULVERT PIPE UNLESS OTHERWISE NOTED. 7. BURIED UTIUTIES ARE SHOWN IN THEIR APPROXIMATE LOCATION. THE CONTRACTOR SHALL HAVE THE UTIUTIES VERIFIED ON THE GROUND PRIOR TO ANY CONSTRUCTION. S. BEFORE WORKING IN PIERCE COUNTY RIGHT-OF-WAY, THE CONTRACTOR AND/OR APPLICANT SHALL PROVIDE PROOF OF LIABILITY INSURANCE N AN AMOUNT SUFFICIENT TO PIERCE COUNTY RISK MANAGEMENT (AND SHALL POST A 11FINANCIAL GUARANTEE TO ASSURE COMPLETION OF WOFIK THE PIERCE COUNTY RISK MANAGEMENT OFFICE CAN BE CONTACTED FOR INFORMATION AND DETAILS CONCERNING LIABILITY INSURANCE REQUIREMENTS. 9. A FINANCIAL GUARANTEE IN THE AMOUNT OF $ TO ENSURE THE CORRECTION OF DEFECTIVE IMPROVEMENTS, WILL BE REQUIRED AND WILL REMAIN IN EFFECT FOR A PERIOD OF 18 MONTHS FROM THE TIME THAT PIERCE COUNTY ACCEPTS THE ROAD FOR MAINTENANCE. 10. ON -SITE EROSION CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE APPUCANT. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE BY PIERCE COUNTY, AND WITHIN 18 MONTHS THEREAFTER, SHALL BE CORRECTED BY THE DEVELOPER. 11. ANY REVISIONS TO THESE PLANS MUST BE MADE BY THE ENGINEER AND APPROVED BY THE COUNTY PRIOR TO ANY IMPLEMENTATION IN THE FIELD. 12 ALL PAVEMENT MARKINGS SHALL CONFORM TO THE REQUIREMENTS OF THE M.U.T.C.D. AND THE PIERCE COUNTY STANDARD PAVEMENT MARKING DETAIL. 13. THE COUNTY MAY CHOOSE TO DO ALL STRIPING, BUTTONING, AND DELINEATION WORK AND CHARGE THE APPUCANT FOR ACTUAL COSTS INCURRED BY THE COUNTY. THE APPLICANT SHALL CONTACT THE TRAFFIC OPERATIONS CENTER AT 531-6990 TO COORDINATE AND VERIFY COUNTY AVAILABILITY. 14. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB STE WHENEVER CONSTRUCTION IS IN PROGRESS. 15. PIERCE COUNTY SHALL BE NOTIFIED 48 HOURS BEFORE CONSTRUCTION IS STARTED. 16. TEMPORARY CUL-DE-SAC: FILL UNPAVED PORTION OF 40-FOOT RADIUS WITH 2-INCH COMPACTED DEPTH CRUSHED SURFACING TOP COURSE AND SLOPE AT 2X TOWARDS THE ROAD AND LEVEL TO THE THICKENED EDGE. 17. SLOPES TO BE STABILIZED TO PREVENT EROSION. IN CASE EROSION OCCURS IN DITCHES, DITCH LINING IS TO BE PROVIDED AS REQUESTED AND SPECIFIED BY 171E COUNTY. 18. ALL TYPE 2 CATCH BASINS OVER 4 FEET IN HEIGHT SHALL HAVE STANDARDS STEPS. 19. WHERE NEWLY CONSTRUCTED PAVING MEETS EXISTING PAYING, OVERLAY AND FEATHER NEW PAVEMENT TO PROVIDE A SMOOTH TRANSTION FROM EXISTING TO PROPOSED PAVING. APPLY TACT COAT TO ENSURE PROPER BONDING. 20. PROVIDE 8-FOOT SHOULDER OF 2-INCH COMPACTED DEPTH MINIMUM CRUSHED SURFACING TOP COURSE AROUND ENTIRE RADIUS AND TAPER TO EXISTING SHOULDER ON BOTH SIDES. (SEE PLAN MEW FOR TYPICAL LOCATIONS.) 21. ALL PAVEMENT TYPES WITHIN EXISTING COUNTY RIGHT-OF-WAY SHALL NOT BE CUT FOR A PERIOD OF TWENTY-FOUR (24) MONTHS AFTER THE PAVEMENT HAS BEEN CONSTRUCTED OR RESURFACED. PUSHING, HOLE -HOGGING, PULUNG, ETC., MUST BE EXPLORED ON ALL ROAD CROSSING REGARDLESS OF THE CONDITION OF THE ROAD PAVEMENT. A UST OF ROAD SEGMENTS THAT ARE AFFECTED BY THIS PROHIBITION MAY BE OBTAINED AT THE COUNTY PUBLIC WORKS DEPARTMENT. NOTE : SEE SHEET C31 AND C32 FOR PIERCE COUNTY STANDARD DETAILS A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST GENERAL PLAN NOTES (CITY OF AUBURN) 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE CITY OF AUBURN'S REQUIREMENTS AND SPECIFICATIONS, STANDARD SPECIFICATIONS SHALL BE 1994 APWA AS MODIFIED BY THE CITY OF AUBURN. 2. A COPY OF THESE APPROVED PLANS AND APPLICABLE CITY DEVELOPER SPECIFICATIONS AND DETAILS SHALL BE ON THE SITE DURING CONSTRUCTION. 3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE -CALL (1-BCD-424-5555) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE AND TELEVISION). 4. DURING CONSTRUCTION, CONTRACTOR SHALL BE REQUIRED TO CONTROL ON -SITE STORM WATER RUNOFF BY USING TEMPORARY EROSION/SILTATION CONTROL PROCEDURES. NO SEDIMENT -LADEN STORM WATER SHALL BE ALLOWED TO DISCHARGE INTO THE CITY OF AUBURN'S STORM DRAINAGE SYSTEM OR ONTO ADJACENT PROPERTIES. 5. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS SO AS TO AVOID DAMAGE OR DISTURBANCE WRING CONSTRUCTION. 6. ALL DOWNSPOUTS SHALL BE DIRECTED INTO THE STORM DRAINAGE SYSTEM. 7. ALL CONNEC7ONS OF SDR 35 PVC PIPE TO MANHOLES STALL BE MADE BY USING A.C. OR GPK MANHOLE ADAPTORS OR APPROVED EQUAL. e. THE MAXIMUM LAYING LENGTHS SHALL NOT EXCEED 12 FEET 8 INCHES FOR SDR 35 PIPE. 9. BEDDING FOR PVC PIPE SHALL BE 5/8-INCH MINUS CRUSHED ROCK, FOUR INCHES (4") UNDER TO SIX INCHES 6') MINIMUM OVER THE PIPE, AS PER CITY OF AUBURN STANDARD DETAIL GEPT-3 10. BEDDING FOR CONCRETE AND DUCTILE IRON PIPE SHALL BE 5/8-INCH MINUS CRUSHED ROCK, SIX INCHES (8') MINIMUM UNDER TO SIX INCHES (8") OVER THE PIPE, AS PER CITY OF AUBURN STANDARD DETAIL GEPT-2, 11. ALL PIPE TRENCH BACKFILL MATERIAL SHALL BE CUSS 'A' BANK RUN GRAVEL, MODIFIED BY THE CITY OF AUBURN. 12. PIPE TRENCH BACKFILL MATERIAL WITHIN THE RIGHT-OF-WAY SHALL BE 5/8 INCH MINUS CRUSHED ROCK. 13. EXISTING PAVEMENT SURFACES SHALL BE SANG UT FINAL DEPTH WITH STRAIGHT, UNIFORM EDGES, 12" OUT FROM THE EDGE OF EXCAVATION. ALL JOINTS BETWEEN THE NEW AND ORIGINAL PAVEMENT SHALL BE PAINTED NTH ASPHALT EMULSION (CSS-1). 14. STREET CURBS SHALL BE PAINTED WITH FORMULA W1D-T1 (YELLOW) FIVE FEET FROM EACH SIDE OF ALL DRIVEWAYS AND 15 FEET EACH SIDE OF ALL FIRE HYDRANTS. 15. ALL REQUIRED LANDSCAPING SHALL CONFORM WITH CITY OF AUBURN ZONING ORDINANCE, SECTION NO. 18.50. 16. THE CONTRACTOR SHALL INSTALL. REPLACE, OR RELOCATE ALL SIGNS AS SHOWN ON THE PLANS OR AS AFFECTED BY THE CONSTRUCTION, PER THE CITYS STANDARD DETAIL TRSP-1. 17. ELECTRIC AND TELEPHONE UNES SHALL BE IN A TRENCH WITH A MINIMUM HORIZONTAL SEPARATION FROM OTHER UTILITIES (SEVER, WATER, STORM) OF FIVE FEET. 18. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACIUTIES SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON UCENSED SURVEYOR OR A WASHINGTON UCENSED PROFESSIONAL CIVIL ENGINEER. 19. DURING CONSTRUCTION, THE PUBUC STREETS ADJACENT TO THIS PROJECT SHALL BE KEPT CLEAN OF ALL MATERIAL DEPOSITS RESULTING FROM ON -SITE CONSTRUCTION, AS DIRECTED BY THE CITY. 20. THE ROAD SUBGRADE SHALL BE REGRADED AND RECOMPACTED AFTER UTILITY AND EARTHWORK OPERATIONS ARE COMPLETED. THE GEOTECH SHALL THEN INSPECT, TEST AND MAKE RECOMMENDATIONS FOR SUBGRADE COMPACTION AND ROAD BASE MATERIALS. 21. REFER TO AUBURN STANDARD TRENCH EXCAVATION AND BACKFILL DETAIL GEPT-1, GEPT-2, AND GEPT-3 FOR CONSTRUCTION PROCEDURE. 22. A PRE -CONSTRUCTION MEETING SHALL BE REQUIRED PRIOR TO STARTING ANY ONSTE WORK. STORM DRAINAGE NOTES (CITY OF AUBURN) 1. STORM LINES SHALL BE LAID TO THE GRADES AND ELEVATIONS SHOWN ON THE DRAWINGS AND SHALL NOT BE CHANGED WITHOUT CITY APPROVAL. 2. CONTRACTOR SHALL OBTAIN ANY NECESSARY STORM LINE CONNECTION PERMITS FROM THE CITY OF AUBURN PRIOR TO CONSTRUCTION. 3. ALL MANHOLES AND CATCH BASINS IN PUBUC RIGHT-OF-WAY OR EASEMENTS SHALL BE ADJUSTED TO FINAL GRADE AFTER FINAL PAVING IS COMPLETE, IN ACCORDANCE WITH THE CITY OF AUBURN'S STANDARD DETAIL NO. STFG-1. 4. PVC PIPE SHALL BE SDP 21 OR SDR 35, WITH APPROVED RUBBER GASKET JOINTS, APED CONNECTIONS TO CATCH BASINS AND MANHOLES SHALL BE CL 150 AC COUPUNG NTH RING TITE BY IPS TRANSTION GASKETS FOR SDR 21 PARE AND AC OR GPK MANHOLE ADAPTOR FOR SDR 35 PIPES, SDR 21 PIPE SHALL BE USED WHERE PIPE COVER EXCEEDS 18 INCHES (18') AND SDR 35 PIPE SHALL BE USED WHERE PtPE COVER EXCEEDS THREE FEET (S). 5. CONCRETE PARE, 12 INCHES (12") IN DIAMETER AND SMALLER, SHALL BE ASTM DESIGNATION C-14, EXTRA STRENGTH, WITH APPROVED RUBBER GASKET JOINTS AND CONNECTIONS TO MANHOLES AND CATCH BASINS SHALL BE BY MORTAR JOINTS. SUCH CONCRETE PIPE MAY BE USED IN UEU OF PVC PIPE WHERE PIPE COVER EXCEED THREE FEET (Y). B. CONCRETE PIPE, 15 INCHES (15') IN DIAMETER AND LARGER, SHALL BE ASTM DESIGNATION C-76, CLASS IV, WITH APPROVED RUBBER GASKET JOINTS AND CONNECTIONS TO MANHOLES AND CATCH BASINS SHALL BE BY MORTAR JOINTS. SUCH CONCRETE PIPE MAY BE USED IN LIEU OF PVC PIPE WHERE COVER EXCEEDS EGHTEEN INCHES (18"). 8. ALL CS'S TO HAVE VANED GRATES UNLESS OTHERWISE NOTED ON PLANS. ALL STORM DRAINS SHALL BE STENCILED 'DUMP NO WASTE, DRAINS TO STREAM.' 9. ALL CATCH BASINS TO BE CONSTRUCTED MOTH A MINIMUM DROP OF 0.1' BETWEEN PIPE INTAKE AND OUTLET. R/w 60' RIGHT OF WAY 3' 5' 4' 18' (STA.0+00 TO STA.2+94) 18' 4' 17' (STA.3+09 TO STA.17+88.22) 17' CENTERLINE OF� ROADWAY 2X 3" CLASS 'B' ASPHALT CONCRETE PAVEMENT 3" DEPTH 5/8" CRUSHED SURFACING TOP COURSE 6" DEPTH GRAVEL BORROW CONC. BARRIER ALTERNATE : 3" CLASS 'B' ASPHALT CONCRETE PAVEMENT CURB & GUTTER 3" DEPTH ASPHALT TREATED BASE 4" CEMENT CONCRETE (SEE SHT. C31) BASE COURSE 3- DEPTH /4" MINUS CRUSHED SURFACING WALK (SEE SHT. C31) NOTE : GRAVEL BASE CL 'B' MAY BE REQUIRED DEPENDING ON SOILS CONDITIONS SUBGRADE-TOP 6" COMPACTED TO 95% MAX. DENSITY VERTICAL CURB ROAD SECTION (62ND ST. S.E") SCALE : 1 "= 5' 50' RIGHT OF WAY 5.5' 1 5.5' J 14 CENTERLINE ROADWAY 14' 4' 5' 4' 3' 5.5' CONC. BARRIER 3" COMPACTED DEPTH CL 'B' ASPHALTIC CONC. NOTE CURB & GUTTER 4" COMPACTED DEPTH 5/8" CRUSHED ROCK HANDICAP RAMPS SHOWN ON PLANS 4" CEMENT CONCRETE TO BE INSTALLED PER PIERCE COUNTY WALK (SEE SHT. C31) NOTE : GRAVEL BASE CL 'B' MAY BE REQUIRED STANDARD DETAILS (SEE SHEET C31) DEPENDING ON SOILS CONDITIONS SUBGRADE-TOP 6" COMPACTED TO 95% MAX. DENSITY BARRICADE NOTES: WIDTH OF RAIL 8' MIN. 12' MAX. LENGTH OF RAIL 4' MN. HEIGHT 5' MIN. TYPE OF FRAME POST OR SKIDS FLEXIBILITY ESSENTIALLY PERMANENT LANDSCAPE STRIP NOTE : HANDICAP RAMPS SHOWN ON PLANS TO BE INSTALLED PER PIERCE COUNTY STANDARD DETAILS (SEE SHEET C31) VERTICAL CURB ROAD SECTION (ALL OTHER ROADS) 5' VOFFSET SIDEWALK ON ONE SIDE. SEE PLANS FOR LOCATION SCALE : 1 "= 5' BOLTS: 2 PER JOINT 1/2'X 3' LAG GALV. SCREWS BOARDS: STRIPE NOTES: 8'X I' OR 12'X V ORANGE & WHITE IF TEMPORARY. RED & WHITE IF PERMANENT. H REFLECTORIZED SLANT DOWNWARD, RIGHT OR LEFT, R IN DIRECTION TRAFFIC WILL PASS. bI SLANT BOTH DIRECTIONS FROM MIDDLE n IF TRAFFIC PASSES JIOTH ENDS. WIDTH 6" EXCEPT 4 IF RAILS ARE LESS THAN 3' LONG. 1' VARIES 2' MIN SLANT DOWNWARD TO MIDDLE AT END OF CLOSED ROAD. SEE SEC. 5.07 AND MUTCD SEC.6C-8. POSTS: 4'% MIN. PRESSURE TREATED OR CEDAR PAINTED WHITE. SMNOBAGS FOR ADDED STABKITY TYPE III TEMPORARY BARRICADE NOT TO SCALE APPROVED : 1.1te& DIRECTOR OF PUB C KS DATE 95-100 PROJECT NO. D.B. DRAWN BY 6-10-97 ISSUE DATE 1-16-98 SHEET REVISION u REVISIONS: ADDED BARRICADE DETAIL 7-03-97 LEL REVISED PER LAKELAND/PIERCE COUNTY/AUBURN REDUNES 10-07-97 LEL REVISED SECTIONS PER PIERCE COUNTY 11-24-97 LEL REVISED 62nd AVE SECTION 1-16-98 LEL V, n1 Z", 3" o PACIFIC ENGINEERING DESIGN INC. CIVIL ENGINEERING AND PLANNING CONSULTANTS osa IS(W WATER SEWER NOTES (CITY OF BONNEY LAKE) 1. ALL WATERMAIN MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (WSDOT AND APWA, 1984), AND CITY OF BONNEY LAKE CONDITIONS AND STANDARDS FOR WATER MAIN CONSTRUCTION, DATED JANUARY 3, 1988. AND ANY AMENDMENTS THERETO. 2. DUCTILE IRON PIPE SHALL CONFORM TO AWWA C151, WITH A STANDARD THICKNESS CLASS 50. 3. FITTINGS FOR D-E PIPE SHALL BE DUCTILE IRON OR CLASS 250 GRAY IRON CONFORMING TO AWWA C-110. 4. TRENCH EXCAVATION AND BACKFILL FOR WATERMAINS. THE WATERMAIN SHALL BE INSTALLED WITH MINIMUM 3 FEET OF COVER AT ALL LOCATIONS WHEN MEASURED FROM THE TOP OF THE PIPE TO FINISHED GRADE UNLESS OTHERWISE SHOWN. THE HORIZONTAL ALIGNMENT SHALL NOT DEVIATE MORE THAN 1 FOOT FROM THE APPROVED DESIGN ALIGNMENT UNLESS APPROVED BY THE CITY OF BONNEY LAKE. SEQUENCE OF OPERATION, TRAFFIC REQUIREMENTS, OR RESTRICTION OF THE AMOUNT OF OPEN TRENCH SHALL BE PROVIDED BY THE CITY OF BONNEY LAKE. CONTRACTOR WILL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND WILL NEED FIELD VERIFICATION FOR EXACT ALIGNMENT AND DEPTH. CONTRACTOR SHALL NOTIFY 1-CALL UTILITY LOCATING SERVICE PRIOR TO ANY CONSTRUCTION TO VERIFY LOCATION OF EXISTING UTILITIES. PRIOR TO BACKFILLING, ALL MAINS AND APPURTENANCES SHALL BE INSPECTED AND APPROVED FOR BACKFLLING BY THE CITY OF BONNEY LAKE. ALL PIPE AND APPURTENANCES SHALL BE HYDROSTATICALLY TESTED AT 200 PSI PER THE SPECIFICATIONS. 5. ALL THRUST BLOCKING SHALL REST ON UNDISTURBED MATERIAL. 6. THE SIZE OF THE THRUST BLOCKING SHALL BE BASED ON THE MANUFACTURER'S RECOMMENDATION AND PER BONNEY LAKE REQUIREMENTS. THE SIZE OF THRUST BLOCKING CAN BE INCREASED BY THE CONTRACTOR IF WARRANTED BY THE SOIL CONDITIONS AND IF DIRECTED BY THE DIRECTOR/CITY - OF BONNEY LAKE. 7. CONTRACTOR SHALL REMOVE SOFT CLAY OR MUCK IF ENCOUNTERED AND BACKFILL WITH CLEAN SAND OR OTHER ACCEPTABLE MATERIAL. 8. FORTY-EIGHT HOURS PRIOR TO BEGINNING CONSTRUCTION, CONTACT CITY OF BONNEY LAKE CONSTRUCTION INSPECTOR AT 862-8602 AND NOTIFY THE CITY OF YOUR INTENT TO START. BE ADVISED THAT ALL PIPE AND APPURTENANCES MUST BE INSPECTED PRIOR TO BACKFILL AND FOUR HOURS NOTICE TO FOLLOW-UP INSPECTION IS REQUIRED. ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF BONNEY LAKE STANDARD SPECIFICATIONS AND A COPY OF SAID SPECIFICATIONS SHALL BE AVAILABLE ON THE JOB SITE AT ALL TIMES. 9. AFTER THE PIPE AND APPURTENANCES ARE IN PLACE AND THE SYSTEM HAS BEEN SATISFACTORILY PRESSURE TESTED, IT SHALL BE FLUSHED MATH WATER OF SUFFICIENT VELOCITY TO REMOVE ALL DIRT AND OTHER FOREIGN MATERIALS, AND DISINFECTED/CHLORINATED IN ACCORDANCE MATH RECOMMENDED AWWA AND THE CITY OF BONNEY LAKE STANDARDS. THE CONTRACTOR SHALL REQUEST A BACTERIOLOGICAL SAMPLE TO BE TAKEN AT LEAST 24 HOURS AFTER FLUSHING AND DISINFECTING. 10. CONTRACTOR SHALL REPAIR AND REPLACE ALL CULVERTS, DRIVEWAYS, MAILBOXES, AND OTHER STRUCTURES ENCOUNTERED IN CONSTRUCTION. DRIVEWAY CULVERTS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH MINIMUM 12" DIAMETER CONCRETE CULVERT PIPE. ALL IMPROVEMENTS WHICH ARE DISTURBED IN ANY FASHION DURING THE CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE CITY OF BONNEY LAKE. 11. TRENCH BACKFILL SHALL CONSIST OF NATIVE MATERIAL EXCEPT AT ROAD AND DRIVEWAY CROSSINGS WHERE FULL DEPTH BANK RUN GRAVEL SHALL BE USED. BACKFILL SHALL BE COMPACTED TO 95% MAXIMUM DENSITY. 12. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES. 13. STREET REPAIR SHALL BE MADE AT ALL STREET CROSSINGS AND ANY LOCATION WHERE CONSTRUCTION ACTIVITY HAS CAUSED ROADWAY DAMAGE OR DISRUPTION. ALL STREET REPAIRS SHALL CONFORM TO ROAD CROSSING DETAIL AND BE UNDER THE DIRECTION OF THE CITY OF BONNEY LAKE OR PIERCE COUNTY WHERE JURISDICTION IS APPLICABLE. 14. THE WATER MAIN PROJECT IS FOR THE CITY OF BONNEY LAKE. WATERMAIN CONSTRUCTION IS IN PIERCE COUNTY RIGHT-OF-WAY. 15. ALL ROADS SHALL BE GRADED TO WTHIN 6 INCHES OF THEIR FINAL GRADE PRIOR TO STARTING WATERMAIN CONSTRUCTION. 16. ALL SERVICE LINES SHALL HAVE A 16 GAUGE COPPER CONDUCTOR ATTACHED TO THE CORPORATION $TOP AND TERMINATED IN THE METER BOX. A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST SANITARY SEWER NOTES (CITY OF AUBURN) 1. TV CABLE, ELECTRIC AND TELEPHONE LINES SHALL BE IN A TRENCH NTH A MINIMUM HORIZONTAL SEPARATION FROM OTHER UTILITIES (SEWER, WATER, STORM) OF FIVE FEET. 2. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER. 3. DURING CONSTRUCTION, THE PUBLIC STREETS ADJACENT TO THIS PROJECT SHALL BE KEPT CLEAN OF ALL MATERIAL DEPOSITS RESULTING FROM ON -SITE CONSTRUCTION, AS DIRECTED BY THE CITY. 4. SEWER LINES SHALL BE LAID TO THE GRADES AND ELEVATIONS SHOWN ON THE DRAWINGS AND SHALL NOT BE CHANGED WTHOUT CITY APPROVAL. 5. SIDE SEWER SHALL BE INSTALLED FROM THE CITY SEWER MAIN TO 5 FEET MIN. BEYOND THE PROPERTY LINE AND SHALL BE A MINIMUM OF 6 INCHES IN DIAMETER MATH A ONE PERCENT SLOPE. 6. SIDE SEWERS SHALL BE WHERE SHOWN BY THE ENGINEER, USING COMMERCIALLY MANUFACTURED TEES AND SHALL BE PLUGGED `NTH WATERTIGHT PLUG. ALL JOINTS SHALL BE APPROVED RUBBER GASKETED JOINTS. (THE LOCATION OF THE SIDE SEWERS SHALL BE MARKED AT THE END OF THE LINE INSIDE PROPERTY BY A PRESSURE TREATED 2X4, FOUR FEET LONG BURIED IN THE GROUND A DISTANCE OF 3 FEET. THE EXPOSED ONE FOOT SHALL BE PAINTED TRAFFIC YELLOW AND THE DEPTH TO THE SIDE SEWER OR TEE SHALL BE INDICATED IN BLACK PAINT ON THE 2X4.) IN ADDITION, THE LETTER "S" 2 INCHES HIGH SHALL BE NEATLY IMPRINTED IN THE TOP OF THE CURB BEFORE THE CONCRETE HARDENS TO DESIGNATE THE SIDE SEWER LOCATION. 7. LOCATION OF SIDE SEWERS SHOWN ARE APPROXIMATE ONLY AND MAY BE CHANGED AS REQUIRED DURING CONSTRUCTION UPON AUTHORIZATION OF CITY. CONTRACTOR SHALL NOTIFY ENGINEER WHEN EXACT LOCATIONS ARE DETERMINED. 8. CONTRACTOR SHALL OBTAIN ANY NECESSARY SIDE SEWER CONNECTION PERMITS FROM THE CITY OF AUBURN PRIOR TO CONSTRUCTION. 9. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT NO CONFLICTS OCCUR BETWEEN SANITARY SEWER LINES AND PROPOSED OR EXISTING STORM LINES PRIOR TO CONSTRUCTION.. 10. ALL SEWER PVC PIPE TO BE SDR 35 IN ACCORDANCE WITH ASTM D-3034. 11. ALL SEWER MANHOLES SHALL BE TYPE 1 - 48" PER STANDARD DRAWNG /SSMH-1 UNLESS OTHERWISE NOTED. I" ��ANZne f ".0093 ZM6 11,0111111111 ► ALL WORK SHALL CONFORM TO CITY OF BONNEY LAKE'S "CONDITIONS & STANDARDS FOR EXTENSIONS TO THE CITY WATER SYSTEM", DATED AUGUST 8, 1995, USE THE FOLLOWING DETAILS FOR CONSTRUCTION CONCRETE THRUST BLOCKING PER STD. DETAIL N4 VERTICAL ANCHOR BLOCKS PER STD. DETAIL /5 FIRE HYDRANTS PER STD. DETAIL #8 1" METERS PER STD. DETAIL #11 1-1/2" METERS PER STD. DETAIL #12 2" BLOW -OFFS PER STD. DETAIL #14 AIR -VACS PER STD. DETAIL #15 VALVE BOXES PER STD. DETAIL #17 FOR WATER ONLY THESE PLANS ARE HEREBY APPROVED FOR CONFORMANCE WITH THE CITY OF BONNEY LAKE PUBLIC WORKS STANDARDS AND SPECIFICATIONS. APPROVAL IS VAUD FOR A PERIOD OF 12 MONTHS FROM THE DATE OF SIGNATURE CITY 1:119110M DATE LEGEND CENTERLINE RIGHT-OF-WAY - - CEMENT CONRETE ASPHALTIC CONCRETE PROPOSED CONTOURS 430 EXISTING CONTOURS -- --- 423 ---- PROPERTY LINE - - EXISTING WATER LINE --- W ---- EXISTING STORM DRAIN ------- EXISTING SANITARY SEWER --- SS ---- PROPOSED WATER MAIN SS PROPOSED SANITARY SEWER IIIIIIIll SO PROPOSED STORM DRAIN E 01 GEO-GRID ROCKERY WALL CATCH BASIN TYPE 1 CATCH BASIN TYPE 2 O SANITARY SEWER MANHOLE • FIRE HYDRANT Cg WATER VALVE N HORIZONTAL BEND / �X TEES FOR SANITARY SEWER ONLY PROJECT REF: FAC 0018-97 dw These plans are approved for conformance with the City of Auburn's Engineering Division requirements Approved By. Lr).A� S.ry Date Approved: L61W27 WATER METER r F.D.C. P.I.V. Record Drawing Certification These drawings conform to the Contractor's construction records. By. Date: Title/Position: Confirmed by City. Date: EXPIRES: SEPT. 5, 1999 N re, u a8 Sm0 W 0 0 Qm pp� WLL Z Z gggggggg �W1 Y gq& N t� n�� L 95-100 PROJECT NO. D.B. DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION `' 1f i REVISIONS: RENSED PER C1ENT/AUBURN/11OIINEY LAKE REDUNES 9-29-97 LEL o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS OS D/8" A PORTION OF SECTIONS 5 ANM 6, TOWNSHIP 20 NORTH, FIANC. E 5 EAST CENTERLINE RIGHT—OF—WAY PHASE LINE — — — — — — BUILDING SETBACK LINE ASPHALTIC CONCRETE PROPOSED CONTOURS 430 EXISTING CONTOURS -- -- A2.- LOT LINE — — — — PROPOSED WATER MAIN --- PROPOSED SANITARY SEWER 04 PROPOSED STORM DRAIN 11,4 CATCH BASIN TYPE 1 CATCH BASIN TYPE 2 Q SANITARY SEWER MANHOLE FlRE HYDRANT Q WATER VALVE N/ HORIZONTAL BEND TEE +tom SCALE: 1" = 50' FOR WATER ONLY THESE PLANS ARE HEREBY APPROVED FOR CONFORMANCE 1WTH THE CITY OF BONNEY LAKE PUBLIC WORKS STANDARDS AND SPECIFICATIONS. APPROVAL IS VALID FOR A PERIOD OF 12 MONTHS FROM THE DATE OF SIGNATURE CITY ENGINEER DATE KEY MAP Record Drawing Certification These drawings conform to the Contractor's construction records. By. Date: Title/Position: Confirmed by City. Date: FOR SANITARY SEWER ONLY PROJECT REF: FAC 0018-97 Thew plans are approved for conformance with the City of Aubum's Engineering Division requirements Approved By. Date Approved: -�f APPROVED : LOAF DIRECTOR OF PUBLI S DATE a 0 W 0 W W Q 0 I a: E W Or �J 0 0 I m m D (0 > m �+ Q N a vv 2 ox owo< Z 0 iL Q OWQgg W WWI Y <FWUj ^ Q FNW0 J NM 0 LL 40=1*I1F PROJECT NO. DB DRAWN BY 6-10-97 ISSUE DATE 10-27-97 SHEET REVISION C 6 t. REVISONS: ADDED INFO 7-03-97 LEL REVISED PER CLIENT/AUSURN/BONNEY LAKE REDLINES 9-29-97 LEL REVISED PER CLIENT/PIERCE COUNTY REDLINES 10-07-97 LEL REVISED ROAD W/ RELOCATED FIRE HYDRANTS 10-27-97 LEL U o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS 0019(or '598ias0 S1Nv-L—nSN00 JNINNb'—ld o •ON J NJISDQ ONUBBNION D 0I=JIOVCJ dNV JNIUI39NIJNB -11A10 o 0 h, - -6 131 LB-6Z-6 S3NnO38 3NVl A3NNOBANnonVZlMno Lad msAM 131 L6-CO-L DAM MOM :SN06N3L n i g m A m 3 N0ISIA36 133HS L6-6Z-6 31V0 3nssi L6-OL-9 AS NMV2l0 80 'ON 103`0ild r �[ > 1 I� r* gi Z W O T V + v c� 0 z W m I pfl '9 '1d36 :S3 X31 15 31VO :panojddV aloa :A8 paAouddy cluaulajlnbai uolslAla 6ulua9ul6u3 B wn9nV to AlIO a4l 4liM Q3UDWMjUO3 lo) panoiddo ajo cuold osalll 46—QLOO OVA :A3a i33rO6d AINO 83M3S ANV11NVS bO3 :alo0 :Kllo AQ poWlyuoo :uolllsod/ollu :DID(] :48 •spjooai uollonllcuoo a JojaDjjuoo ayl of WJo)uoo 86UIMDup awyL uollooyHJao 6uIMDJa plooaa dVV4 AN SXMOM Onend d0 8010311a O3Ao8ddV 31Va LMNIDN3 Alp 36MYN01s 40 31Va 3H1 V408A SHAM Z L 40 00183d v WJ onvA s1 ivnoaddv 'SNOLLYOU103ds aNY SawoNns smm onand 3XVl A3NN08 d0 Alp Ni HUM 30NYKWJNOD 80A a3A08ddV A8313H 36V SNVld 3S3H1 IMEME ME ME ME MEMEMEM MEMEN ME ME ,09 MA: TWOS +1+ 331 v-F- (IN38 WiNOZINOH N 3AlVA 831VM p 1NV"H 361-4 31OHNVPI N3M3S kHVilNVS Q Z 3d)d NISVa HO1VO ® l 3dA1 NISVB HO1VO WE NIV8a ASOlS a3SOd08d -- 83M3S Aav1INVS a3S0d08d - NIYN 831VM a3SOd0Nd - - - - — An 101 FZb ---- -- S8nO1NOO ONLLSIX3 OCb SMnO1NOo a3sod08d 31380NOO OIL-lVHdSV 3Nn XOVELM ONlalln8 — — — — — — 3Nn 3SVHd AVM-JO-lHOW 3Nn1 IMN30 AiNO N31VM NOJ 0 I z /m� W m m co I m 0 (T� V 0 z C D 1SVa 9 alDNdl=l 'H1IA(:>N OZ dIHSNM01 '9 dNV 9 SN011C>SS d0 N011610d V A PORTION OF SECTIONS 5 ANE> 6, TOWNSHIP 20 NORTH, RANGE 5 EAST CENTERLINE RIGHT—OF—WAY PHASELRIE — — — — — — BUILDING SETBACK LINE ASPHALTIC CONCRETE PROPOSED CONTOURS 430 EXISTING CONTOURS - --- 42.' LOT LINE PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM DRAIN IM CATCH BASIN TYPE 1 CATCH BASIN TYPE 2 Q SANITARY SEWER MANHOLE FIRE HYDRANT Q WATER VALVE N/ HORIZONTAL BEND TEE SCALE: 1" = 50' FOR SANITARY SEWER ONLY PROJECT REF: FAC 0018-97 These plans are approved for conformance with the City of Auburn's Engineering Division requirements Approved By. Date Approved: FOR WATER ONLY THESE PLANS ARE HEREBY APPROVED FOR CONFORMANCE WITH THE CITY OF BONNEY LAKE PUBLIC WORKS STANDARDS AND SPECIFICATIONS. APPROVAL IS VALID FOR A PERIOD OF 12 MONTHS FROM THE DATE OF SIGNATURE CITY ENGINEER DATE KEY MAP 00 Record Drowing Certification These drawings conform to the Contractor's construction records. By. Date: TTtW/Position: Confirmed by City. Date: - APPROVED DIRECTOR OF PU 1N0 KS DATE EXPIRES: SEPT. 5, 1999 L 0 E J 0 0 N 0 W IL v W 'a 0 01 0 I F- 0 (0 a 8 L 0 0 < Z °z$$OW$$LU. Q Z>a J 3 W Y� QN Y �F Q WNJ�j F INV mWN J W'j. 9 9 PROJECT NO DB DRAWN BY 6-10-97 ISSUE DATE 10-27-97 SHEET REVISION C9 REwSIONS: ADDED INFO 7-03-97 LEL RENSED PER CUENT/AUBURN/BONNEY LAKE REDUNES 9-29-97 LEL RENSED PER CUENT/PIERCE COUNTY REDUNES 10-07-97 LEL REWSED ROAD W/ RELOCATED FIRE HYDRANTS 10-27-97 LEL P F 5 c 5A -« lq U o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS osbmw A PORTION OP SECTIONS 5 ANM 6, TOWNSHIP 20 NORTH, RANQE 5 EAST CENTERLINE RIGHT-OF-WAY PHASE LINE BUILDING SETBACK LINE ASPHALTIC CONCRETE PROPOSED CONTOURS 430 EXISTING CONTOURS -- --- 423 -- - -- ---- LOT LINE - - PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM DRAIN CATCH BASIN TYPE 1 03 CATCH BASIN TYPE 2 Q SANITARY SEWER MANHOLE FIRE HYDRANT Q WATER VALVE 04 HORIZONTAL BEND TEE �. SCALE : 1 " = 50' � Illlllli � FOR SANITARY SEWER ONLY PROJECT REF: FAC 0018-97 Ar%) These plans are approved for conformance with the City of Auburn's Engineering Division requirements Approved By. J JA- - -- - Date Approved: 1/ei�2! FOR WATER ONLY THESE PLANS ARE HEREBY APPROVED FOR CONFORMANCE WTH THE CITY OF BONNEY LAKE PUBLIC WORKS STANDARDS AND SPECIFICATIONS. APPROVAL IS VAUD FOR A PERIOD OF 12 MONTHS FROM THE DATE OF SIGNATURE CITY ENGINEER DATE KEY MAP Record Drawing Certification These drawings conform to the Contractor's construction records. By. Date: Title/Position: Confirmed by City. Date: APPROVED : DIRECTOR OF PUBLIC WORKS DATE EXPIRES SEPT. 57T999 J�A 95-100 PROJECT NO. DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION n n rn n J 1 REVISIONS: ADDED INFO 7-03-97 LEL REVISED PER CLIENT/AUSURN/BONNEY LAKE REDLINES 9-29-97 LEL PF �, _ a� o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING ND PLANNING CONSULTANTS OSW8foS'' O"S/Q.510 S-LNv-L-inSNOO ONINNV-IcA CINV ONIUDDNIONE3 -11A10 . .. .... ..... ........... .. .. .. ............ .... . ... ... . ..... ... ..... . .... ... . . .. ............ .. .. ...... .. ... .. ..... ..... ........ . ...... ...... . . . . . . . . . I ! . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . ................ ......... O a i . . . . . . . . . i . . . . . . . . . . . . . . . . . . . . 004St::::::: ....... ............ ......... ............ .... .... ................ ......... ......................... ............. .......... ......... ......... ........................... ....... ...... . ....... NOISIA36 133HS 31'Va 3nssi L6-20-L ),S NMVaQ -13-1 'ON Lo3rodd OOL-96 I MW 0 r. z Q m m ,�c M� > > z m . 71 O 14 3 m m 0 p L > Z > z ODD p > 0 0 m > > Z �r 0 m z ILI dVV4 )"D I OZ m 611: �nvos o -ONJ NOISDC] ONIUDDNIOND 01=110VC:j 131 %6/,/, 6talmvkis aWA= 131 LB-*Z-II AINnOO 33d3ld aid 035IA3N 131 L6-LO-OL S3Nna-m AlNnoo 30a31d/awuxvi aid a35ik3a TJI LO-9Z-2 SW130 NOU335ki3lNl a3aOV :SNO"3w OD (du) serLLS NIV80 Vd O'SL9-(]Vd 6*69-an_j O*OL9=c]Vd I > fvwois 101 wLM nOON1 1 -L. ! w c 101 z 101 mZ� , d > 0'909=OVd 0 L io-i 101 9-0 99 09 919 101 1,09 131NI um 00 navelna�m -ANI (dkL) S3LVHD 03NVA (I aVO8 83d)*YIS 3A*H 01 SNISV%MV3 TIV 13-1"am nuHi IAK all 719 -lv-,lc*-v"*JeYLS DO'006 - W (1L UXI)VIVON 80 99609 OCO q , (v OV08) 6t 99Z Not, IRLT01 (v CIV08) 00 00 -8 3.Lt,99.�9S 4, NOW a.s (3NZ9 (1)( 8L+6 • (Coc o 00 +0 -N SGV .9L -4109L (01146 Oi OL9 909 9,9 Lvio asno naH.L /m (11 3dki) WON 83 > (dU) M 0 09 oer / ao \ I ciAvll O/H 3, oc 1016Z 101 ro LogS (dU) 1N3V3SV3 9z iol Z> 0 kLnLLn 3cHm oL — > LC iol 0 c I cv zog O*ZO9-OVd O*ZO9=C]Vd 0709=0 wqoq�aYd 9=qvd /-z 101 0,061, f 1SV9 9 BONVU HiHON OZ dIHSNM01'9 (INV 9 SNOLODS =10 NOUH08 V I \ / CB N0.77(TYPE 11-48'0) STA.(PER ROAD E) 5_ W/ THRU CURB INLET LOT 53 PAD it6.+4e.00 08 N0.78(TYPE II-48"0 STA.46+50.00, 18' LT / // a 15+46.00 W/ SOUD LOCIKW"D _ —98-JK).ao (TYPE-1) STA48+69:08, 17' LT eo A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST e PAD=599.0 \ \ \� A - 54'03.29' LOT 54 T - 15.52' \ o W L - 141 52' w 24 _ PC-S 0+27.09 w SIGN/UTILITY EASEMENT 00 - 1723'47' a T MON' N m10 3t.,WA) _ OLF 1f pVC D5.a5 03.15 147LF 12" P + iO O+OO 00(E) 8 VC (ROAD A) �.. z 4., R=830.00' L=107.28-'- _ .___. - ' -__- _. R 830.00' r- + MON 62ND ST. S.E. �/� k H/C RAMP -'Sri D 06 10' WIDE UTILITY 6° (TYP) `-PC-STA :.__ �O EASEMENT (TYP) 6 ' 4 rNi I5+ CB aOA(TYPE 1) 1 STA. . . 17' RT -LV /�r � 615 Is*4e.00LOT 5 —_ 1— _ 4 1 616 �AD=618.0 PAD-620.0 I 51 — 812 614— I� CB N0.78A (TYPCTYGIO� { STAA6+HIM 17' RT / u.+4a.0o \610 LOT 6 I � r-------- � PAD=623.0 bp0 / lZ CB N0.79(TYPE 1) STAAi7+86,90 17' LT 1i+64.50 STA.17+88.22 END ROAD IMPROVEMENTS INSTALL TEMPORARY TYPE III BARRICADES PER DETAIL, SHEET C2 IT+B(e.22 LOT 761,9 / so 62 0\ / s� LOT 8 V. AT Sl -598.55 �i NOTE ALL CATCHBASINS TO HAVE 4y VANED GRATES (TYP) J p� oX SCALE: 1" = 20' KEY MAP Yes/Ory L V'Sl�\ &,ol EXPIRES: SEPT. 5. 1999 Z JILQ �001 oa co 00 00 rn a 3 w 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE 14T1'Y4 9�! SHEET REVISION 7-oco-lb CID REVISIONS: ADDED INTERSECTION DETAILS 8-26-97 LEL REVISED PER LAKELAND/1P-IERCE COUNTY REDLINES 10-07-97 LEL REVISED PER PIERCE COUNTY 11-24-97 LEL 2EVISM -,TKnmlldq `T/E+/9$ LEL. o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS Os LOT 7 _ _ ' 6 9 1WDIVIDU L (NORM -RAD-6&0 \ ' LOT 6 CB �.� (TYPE � PAb-621.0 INV*- \ / 619.00 ' CO N0.24(TYPE 1) \ \ STA.21+35.26,14'-RT N X� X 0 ll/C RAMP �j LOT 16 \ PAD \1622.0 A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST LOT 8 LOT 9 I LOT 10 \ s?s PAD�824 0 PAD-625.0 _PAD=S26.0— 6Z5 y / / / I 22.;0 CB N0.26(TYPE ,) / LOT311 621.00 STA.20+05.34, 14 RT — - _ - -- --- - --- -- ---/ - =628.0 No.27 — PAD -jjjjjRPw------7-69LF 12" PVC e REB _ CA AVE. S.E. a p - 233.93 (ROAD L) --t ry , PT/PC / R-200W / T - 132.42' L - 233.93' CB N0.24A(TYPE 1) 621.00 � STA.21+35.26, 14' LT LOT 15 PAD=624.0 \ TEMPORARY WL—DE—SAC N \1. PAVEMENT STRUCTURE OUT TO ROAD PAVEMENT STRUCT4l 2. SLOPE OF TEMPORART \TOWARD ROAD. END CURB AND GU C URB AND GUTTER FIRAMC CB N0.26A(TYPE 1)\ LSTA.20+05.34, 14' LT `10' WIDE UTILITY 1pl EASEMENT (TYP) sTA AND A LOT 14 PAD-626.0 E FACE OF CURB TO BE IDEOC, 7NT SHALL BE A MIN. OF 2% fRUCT10N AT THE POINT WH a THE CUL—DE—SAC RADIUS. TO HAVE A.19+34.79, 14' RT \s�\ �_ / LOT 12 a A.19+66.29-/ - N A.1 R - T - L - \ INV - 63 �t� _ PAD-6�9:0, \ 26(TYPE 1) 18+51.71, 14' RT INV.- Ilk e26.38 P 630 6 �F 72• J20 00, E 40' RADIUS IND CURB, WTTER� (BOTH SIDES) 17+85.00 RADIUS POINT OF RADIUS TEMP. CUL—DE—SAC. NOTES BELOW LEFT C8 N0.2! LOT 13 STA.18+51. PAD=628.0 A STA. LT v°'S 828.00 END PAVING, INSTALL TYPE III BARRICADES SHEET C2 AD �'e asl \ INV.- L \\ 6�00 — 640 \� ` 1 t MYril►rtr SCALE: 1" = 20' KEY MAP yl IEImI11ES: WT. % 1999 I W z�lLEi �00a0 oa 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE 11-24-97 SHEET REVISION c I co m cc 3 aJ W O 0 �1 w N o: a Of w O z Z Q O n REVISIONS: ADDED INTERSECTION DETAILS 8-26-97 LEL REVISED PER LAKELAND/PIERCE COUNTY REDLINES 10-07-97 LEL ' REVISED PER PIERCE COUNTY 11-24-97 LEL i o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS Osab / S oe A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST LOT 32 LOT 30 I LOT 31 PAD=619.0 J \ I PAD=626.0 PAD=623.0 NOTE : CB N0.17 (TYPE 1) I \ A:ALL C BASINS TO HAVE STA.(PER ROAD L) VANED !ATES (TYP) W/ THRU CURB INLET ' PAD=628.0 CO NO.19A(TYPE 1) I i 10' 1nDE unutY , \� STA.2+20.OQ 14' RT EASEMENT (TYP) INDIVIDUAL LOT STORM I rs - 920,0 ,39 I INv.- DRAIN STUBS (TYP) T 125.3� 11 622.50 I WIV.- IN / \ L - 198J0 619.50 61t}- -' — u pu .. - MON r REBE CROAD S) S.E. v _ s28oa 1a w s• i d Q yWyy au9 - I INV.- nl I�,.o-eTaz+lo_11 172LF 12-�' PVC � '� o+oaoo(s) W . ��- 025.00 22+61.72(L) I LOT 20 PAD-829.0 per- I 9w 8_PVC____ _____ \ 9cJs°o. e �24.00 I V- (— —� — — �_ J INV.- /eeltVe..- CB NO.19( E 1) eZt.eo 1 (;B .18(TYPE 1) J/ \� / \ JJ CB NO.20(TYPE 1) STA.2+20.00, 4' LT I H/C RAMP- / STA.0 49.00, 14' LT STA.2+80.00, 14' LT W/ TH U CURB INLET , LOT 19 LOT' 1� _ J I Pao s g o- - H LOT T6 t I PAD=628.0 PAD=628.0 I ; / I PAD-822.0 I REVISIONS: ADDED INTERSECTION DETAILS 8-26-97 LEL REVISED PER LAKELAND/PIERCE COUNTY REDLINES 10-07-97 LEL aI 3e. 14 q{/ flCf 7• 6/f !T /We L Alf�4AJl(J o PACIFIC ENGINEERING DESIGN INC. SCALE: 1" = 20' 20 0 10 20 40 KEY MAP ItxIWS: SEPT. 5, 1999 1 i d1In �L0 � ?0� Oa 00 00 00 m Q 3 L -1 1n O 0 w Y K 0- x W 0 0 z 0 n 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE 10-07-97 SHEET REVISION c 1 12-- CIVIL ENGINEERING AND PLANNING CONSULTANTS om 8&s LOOT 27 � L /m^0 AD=629.0 IND UAL LOT STORM DRAIN STUBS MID) \ INV.- LOT 261, 625.90 PAD=f29.0 INV- b .- 626.15 10' WIDE UTILITY EASEMENT (TYP) NOTE ALL CATCHBASINS TO HAVE VANED GRATES (TYP) I LOT 25 szs.6o PAD=629.0 _ INS 62: \$ LOT 24 PAD=629.0 s� A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST i/ LOT 28 �( a NU,22\ LOT 30 PAD=629.0 / ` LOCATE AS SHOWN \ PAD=626.0 LOT 29 \ INV PAD=628.0 _- - 'f INV.- 624.95 m / / / PT-STA: %I-/ R_`125. p. PL• R� (ROAD Sa 195 70, R = 125.00' a-35.00' _T .00' 627.67 .45 ���� _�� - A/ 4. / INVI 825.05 i LOT 23 I/ 'LOT 22 PAD=829.0- 635 PAD=630.0 INV.- CO NO.21 (TYPE STA.3+45.00. 14' LT LOT 21 PAD=630.0 LOT 20 \ PAD=629.0 \ I \ SCALE: 1" = 20' 20 0 10 20 -- 40 KEY MAP 1 (EXPIRES: SEPT. 5. 1999 1 2 1 znaoanau 0 a 0 O a) z Q 00 m 00 w QJ W 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE 10-07-97 SHEET REVISION Cl( REVISIONS: ADDED INTERSECTION DETAILS 8-26-97 LEL Dp SI-] 14 of 14 U REVISED PER LAKELANDMERCE COUNTY REOLMS 10-07-97 LEL o PACIFIC ENGINEERING DE S I G N INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS O_'Y /VAxo LOT 45 PAD=618.0 NOTE ALL CATCHBAS VANED GRATES LOT 46 PAD-614.0 - G W39'27' R - 00' T- 16.2Y L - 21� fle I \ 3.64 I g?p� � 618 CB NO.13 (TYPE II-48'6) j STA.8+04.73, 20' RT W/ SOLID LOCKING LID PARK AREA \ CB NO.14 (TYPE STA.(PER ROAD L W/ THRU CURB It A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST HAVE CB N0.11A(TYPE 1L� 1 N0.11 (TYPE 1L) \ STA.(PER ROAD A) ST .(PER ROAD A) LOT 47 W/ THRU CURB INLET W�THRU CURB INLET PAD=¢10.0 INDIVIDUA LOT STORM o LOT 27 DRAIN S BS (TYP) '""- _ 6o4.oD PAD-602. � CB N0.13A(TYPE 1) E UTILITY LOT 48 EASEM T (TYP) ! \ 14' LT PAD=608.0 STA.7+95.94, , H/C RAMP N /MONi R-225.OV _ — ls4 tt.2�' 12suf � MON xoeo6.00 u A �PER�Y MON SE' f p 609.03 (ROAD. GCB NO.MLT P"r y s'S / W/ THRU CURB NLEj_-� CB N0.12 (TYPE 1L) 1 STA.9+26.19, 14RT �. W/ THRU CURB INLET 1 to 1 1 LOT 1 1 PAD=610.0 1 1 IF 9+78:191T) 12+95. PERK{ f y 'N r T,..m 1< — H/C RAMP MID) Im / OT 28 s SCALE: 1" = 20' KEY MAP W Z �0 Q Q � d Z Q IL 0 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE i1 SHEET REVISION 7 - 0(.-91b 11 00 m m rn 3 4i QJ W 0 0 M W r J) rn V) a W 0 0 Z 0 RENSIONS: ADDED INTERSECTION DETAILS 8-28-97 LEL REVSED PER LAKELAND/PIERCE COUNTY REDLINES 10-07-97 LEL REVISED PER RENEW 11-24-97 LEL PEVM5ED 'o WrI60INi j T/o/% LEL. PF < I"I IS or 34 o PACIFIC ENGINEERING DESIGN INC. CIVIL ENGINEERING AND PLANNING CONSULTANTS osdbis < A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST cs Noa�+►cTYPE , 62 5 su.fP�e eee ul TYPE i �A,IVISI6N 3 / INV.- 679.00 . 10' WIDE ' iUTY EASEMENT (TYP) NOTE : ALL CATCHBASI VANED GRATES C N0.8 ( ) STA.(PER ROAD U) W/ THRU CURB INLET I nT dr% PAD=625.0 SCALE: 1" = 20' KEY MAP r1C lAlr.6Mtt/ f EXPIRES. SEPT. 5, 1999 Z aw 00��0 ��?Og oa ccv 3 w I 0 a w w d 0 M n 11i o I Q 0 N Q 0 '0 0) 1 W O 2 Z �WN OJZ Y Nmd 95-100 PROJECT NO. LEL DRAWN BY 7-03-97 ISSUE DATE 10-07-97 SHEET REVISION Go co w rn 3 4i 0 0 1) In s Y Q a W 0 0 Z Q 0 n cig REVISIONS: ADDED INTERSECTION DETAILS 6-26-97 LEL REVISED PER LAKELANOMERCE COUNTY REDLINES 10-07-97 LEL ph 51"I I6 or 19 c� o PACIFIC ENGINEERING DESIGN INC.,, CIVIL ENGINEERING AND PLANNING CONSULTANTS OV TV I /y�V06S/ f181aso S1.NV-L-InSN0C) ONINNVd Iel aN`d ONIUEE3NIONa 1VV0 o '�N� NJIS�Q �NI�I��NIJN �I�I�`d� o l31 L6-1Z-11 V6 W 6 S,90 30 SY6M a35N3M 131 L6-10-OL 53NrIC M A1NnOO 30d3ld/ONVI NVl M3d a3wN 131 L6-9Z-0 SlIV13a NOLL03SM AI 03aaV :SNOISLA3M OWN 00 00 NOISIA36 133HS L6-tiZ-LL 31Va 3nssl L6-£0-L AS NMVaa l31 'ON lO3roaci OOL-96 2mN r IIAA '[l l m�N Y 3>> Z z 0 A 0 x D X v 0 z W m I Sco m P N v 0 D 3) �Q200 00$��° �r 0 r m D Z 1S` D 9 DONVU `HiHON OZ dIHSNMOI `9 (INV 9 SNOIlO3S =10 NOLLHOd V I� r LOT 27 � + PAD=606.0 0+52 m 1291.E n $ IINV.=I I 0 STA.13+02.11. 5' LT 1-6 CROSS FL �-M n�tlr v � c Nn vu. A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST '4 �i wl r� LOT 28 � m' LOT 29 LOT 30 \ LOT 31 z PAD=802.0 �y I PAD=802.0 PAD=602.0 \ o\ PAD=602.0 502 Io \ . o / 1 MMtAJIMMtKJ a W'0 I INSTALL Alit -VAC AT / `00 \ HIGH POINT °P / -_- 0+00.00(D) - 222LF 8" DIP i� 9+78.19(T) De as 62ND Sf oo.D R,a _ L -- 103J8' 42'S0'37' R 900.00' _ _ — _ I ALL WATER MAIN TI -BE-' 3 I CLAS"2-Bt1CME IRON . ,. LOT 48 -- LOT 43 PAD=608.0 0+58 28LF 6' PVC INV.-602.0 0 W 5' 62ND ST. S.E. (ROAD A) 353LF 8" D.I.P. o; - / STA.12+91.61. 5.5' RT I ' LOT 1 PAD=610.0 /e. µL SIpE SE1rERS ARE STATIONED FROA1 THE PRECEEDNJG DONTISTREAM % MANHOLE -- SCALE: 1" = 20' 20 0 10 20 - 40 . -- KEY MAP \ T— I LOT 2 I LOT 3 615 _ o PAD=613.0 PAD=616.0 LOT 4 6i2 FAU=blt5.0 Q aQW^ Q a: 3 W J� W 1� a 14L ¢ Z Q O v 0) 3 Q W a a �v z O N e N N_ ` I p N I Q I- LL 0 a" v (n 10, z Q �WN 7.. J N> W W N-jo �( Nma. J PROJECT NO. LEL/D8 DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION RENSIONS: REVISED PER CLIENT E-26-97 LEL REVISED PER CLIENT/AUSURN/BONNEY LAKE REDLINES 9-29-97 LEL o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS Osz I$6!r A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST LOT 53 PAD-605.0 _ , 754b3'29" LOT 54 605— _',/ ar0 + 76.52' \ ALL SIDE SEWERS ARE STATIONED STA.16+54.58, 5' LT l oz _ 14152• PAD=599.0 1 FROM THE PRECEEDING DQWNSTREAM' 1-8" X TEE (FL) 1 0; pj \ / _MANHOLE- 1/ 3-8" GATE VALVES (FLXMJ) II\ c o' 1 / l 4 5' 353LF 8" D.I.P. R=830.00' L=107.28_ S,E, (ROAD A) 62Na sr. 06 �PC-STA.15+5230 �F' Z f1 615 I 2 18.0 PM LOT 5\�� 09 boo ALL WATER MAIN TO BE / CLASS 52 DUCTILE IRON A . 1723"47" T _ — — STA.17+96.00, 5' LT �Js�l 1 BLOW OFF ASSEMBLY °o 1-8" GATE VALVE (FLXMJ) 59.56(A) Do.Do(E) 139LF 8" D.I.P. -'----------- _-___ _-L 144_73' =: 18+04.31(A) 1 LF 8" PVC -- -- SSW NO.30 48"i STA.18+02.50,5.50' RT I (NIN. 614 � 616 PAD=620.0 LOT 6 / PAD=621.0 LOT 7 616 PAD=622.0 � 6,6 f W9KAT[s soup IS MNO aMr�u�r�r Nu 604, 74 LOT 8 SCALE: 1" = 20' 20 0 10 20 0 KEY MAP EXPIRES: SEPT. 5, 1999 Q W Z 000IL Q IL Z Q 0 Q �oC - U) n m n I n e Q a 0 m I �1 a 0 41 Z 0 a m OD 00 m 3 w 0 0 M W 7D V) H to Y a_ a W 0 0 Z a 0 M 95-100 PROJECT NO. LEL/DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION C?Q j RENSONS: RENSED PER CLIENT 8-26-97 LEL REVISED PER CLIENT/AUBURN/BONNEY LAKE REDLINES 9-29-97 LEL hF 6I-I -2I, }- U PACIFIC ENGINEERING [DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS OS"D /86S I LOT 4�1, w PAD=608 Q .a tia. m t„ � N a 1 LOT 4 m PAD-610. I I n N. ?4 91 L) � I 8 18 (1) !-ti=_- t STA.(PER ROv T) LOT 4 PAD t— 6, TOWNSHIP 20 NORTH, RANGE 5 EAST A PORTION OF SECTIONS 5 AND NOTE ALL SIDE SEWERS ARE STATIONED LOT 3 1 LOT 4 FE PRECEEDING DOWNSTREAM LOT 2 1 I II LOT 1 I ez PAD=613.0 PAD=616.0 I 2+05 PAD=618.0 II I 11 610 00 I 0+29 O+65 P0+29 AD=610.0 6 PVC INV -- 42LF 6" PVC I� I 41LF 6 PVC . 606.00 —�-6}2'X -- INV.-605.004. I R OF L�tbh.1 I I ___ — M 5 (Typ _= N — - REBEC A A S.E. � -sra a+7a iB 229LF B" D.LR _4 (ROAD L) 551.5, "" � 230LF 8" PVC 154 9' Ls2749' 11 1 10' MIN. ,--_ X TM 8" ' Pc srA.2a+4s s9 L 55'. I S51'25. 43"E ''' _ — --- AL , 7 7-68 ' .`ram 616 � I — LI STA.24+88.86 3' llT.1-8" X 8" TEE (FFL)8186" PVC3-8"GATE VALVEESS (FLXMJ) INV.-610.00 \ PARK AREA 1 II LOT 33 II PAD=619.0 \ NOTE: ALL WATERMAIN TO BE CLASS 52 DUCTILE I I LOT 32 PAD=619.0 L0T2`5- PAD=620.0 —625 �ryo 219LF 8" O.LP. - b 115L 13 _1'Vy _ 22+61.71 L 200.00' L)' 233.93' L) a a m J I � / 0+71 NV 618.00 M / d ^! LOT/16 a ` { PAD7622.0 --r— 622 ISMOw�m As•W.f IYrN:a %A3 w t SCALE: 1" = 20' 20 C 10 20 40 KEY MAP EXPIRES. SEPT. 5� 1999 N ; W I L v Z 0 n m 17 N m I Q 0 I LL 0 WV0 2 Z a;0 Q �WN J =Ww W J� Y � �md J 95-100 PROJECT NO. LEL/DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 -f.I��iiZINUA&MOM c 0 REVISIONS: REVISED PER CLIENT 8-26-97 LEL REVISED PER CLIENT/AUBURN/BONNEY LAKE REDLINES 9-29-97 LEL D'r cI, 2: i o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS os'D f ftr A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST \ LOT 8 ` LOT 9 I LOT 10 / �s16 o) ' LOT Z PAD=624.0 -- PAD=625.0 I PAD=626.0 bZs — i i 0+46 PAD=622.0 / /41LF 8' II 43LF BTt�bO �ST)C20+4 12 5' RT. - 4,iLF 8 PVC / �,QT 11 i _ / v� LOT 6 0+45 _ INV. 00 1-8 X 6' FLXMJ) NV.�620.00 630 _..---i�7tf GATE VAL. (FL)iMJ _/— PAD-828.0 INV.-817 —_� — �PA6=fi21.0 4' — F.H. / O+Bt LOT 12 43LF 6' PVC / �10 \ 0+82 1+15 i \ \ -622.00 / PAD=629.0 8 PVC INV. 8 PVC 1, ' � INV- \ INV.=614.00 _ NV.-615.00 2 5 Q -1 / / 6 PVC N3V.-618.00 SSMH 1140.37 4ar/o X STA.21+50 , 5.5' LT i LOT 15 PAD=624.0 \NOTE: ALL SIDE SEWERS ARE 3 FROM THE PRECEEDING DOWNS] MANHOLE. LOT 16 PAD —\622.0 U 8" PVC 10' MIN.—' 48"0 0+59 / R " 29LF 6' PVC I / - 174. INV.-620.00 I L - 219, LOT 14 PAD=626.0 0+7e I 28LF 1 INV.-8 DIED / LOT 13 / NOTE: ALL WATERMAIN PAD=628.0 TO BE CLASS 52 DUCTILE 0 / 0+1r 7_ \ Bpi NO•40 46'o INV.-623.00 a p A` C \ STA. 8: y \ INV. 8 f \ ,D+82\ \ . SSMH N0.41 48'm \ i STA.18+30.00, 5.5' LT 1 B�PVC eao � Nsw4Tb Au SCALE: 1" = 20' 20 0 10 2C. 40 KEY MAP 0 Z J QQ�j Ir a) w M ( N 3 WOD p. 18 d v 0 N O 0 N I X rL a 0 L o; M 0 W W5„ 0 Z i`d�d6, Z30 �WN FWZ W J �[ "ma J 95-100 PROJECT NO. LEL/D8 DRAWN BY 6-10-97 ISSUE DATE 8-26-97 SHEET REVISION N n rn n o- X 0 n rn n I 0 zz 0 a 00 ro 00 rn 3 w V) N 0 0 r1 t s V) N Y w 0 0 z 0 n REMSIONS: REMSED PER CLIENT 8-26-97 LEL PP `. I�I 29 ur 3G o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS 0CD 18l,S LOT 20 PAD=629.0 A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST LOT 30 LOT 31 LOT 32 - +74 \ \ II 1 PAD=626.0 L IMOF PVC o =3.00 aJm STA.1+30LO29 0+10 1+42 a 30LF 6" PVC 9•OPAD=628.0 AS a s s VALVE (FU(MJ) m 17LF 6' D.I.P. INV.=620.00 INV.=617.00 � I I 1- 6' F.H. ASSY � I S'S11 N0. 48'0 SSMH N0.36 wo N STA.2+80�0, RT48"a � _ TA.I+WL fyS05' �T .—r .00, 5.5' RT ,�LF g4...D.f.p. vC s a R, l? am sop, � _rss a PC STA.2+ip 11 194LF 8 PVC REBECCA PL 70LF 8' D.I.P. 134LF 8" D.LP. --' 1 STA.1 99. LT. s \� �I_ �- 23 BEND — — — RiSE I 1-a•X6'TEEL 42LF 6' PVC 3-a' GATE VALVVEE 46LF 8 VC 1 INV.-622% \' INV.=622.00 41LF 6' PVC 7� INV.-620.00 \ 0+71 LOT 19 I -LOT 18 �-LQT 17 — �6s �618.00 i PAD=628.0 I PAD 626.0 PAD--926:9- \ W N LOT 16 NOTE: ALL SIDE SEWERS A E STATIONED a PAD=622.0 FROM THE PRECEEDING DOrSTREAM NOTE: ALL WATERMAIN TO BE \ MANHOLE. CLASS 52 I DUCTILE IRON IL_ I (ROAD S) 22+61.72(L) (FLXM� A 9 s ;,M Af- 81Tj r/.YOt• 'Arss Lfolup at" SCALE: 1" = 20' 20 0 10 20 40 KEY MAP 1E%PIRES'. SEPT. 'S. 1999 1 0ZJ Q < LL ,a: 1�{oQL. W W \ Z 0)3Q N 3 Z 0 m 0 ON IL xQ� r LL 0 N w 0 Z Z �3s Q W� J I_�W W NJ� Y cla 95-100 PROJECT NO. LEL/D8 DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION n rn n I M d Q 11 0 0 0 I;! z 0 a ro ro ro rn 3 W 0 0 M W In Y a a 0 0 z a 0 M cram, ram, RE%UMS: REVISED PER CLIENT 9-26-97 LEL REVISED PER CLIENT/AUSURN/BONNEY LAKE REDLNES 9-29-97 LEL cI'i zc m3u U o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS on 19a / LOT 27 I P h0 \ e \ SAD=629.0 1+33 1\_ ;\ NV.==622.0 C / LOT 26/ PAD=626.0 i 1+46 57LF 6' PVC INV.=622.0 LOCATE AS SHOWN 1-91LIND FLANGE (MJ) 1--BLOW OFF ASSEMBLY LOT 25 �a 4 PAD=629.0 37LF 6' PVC ' INV.-622.0 SSMH N0.47 48�� LOCATE A S �� / i 27LF 6" PVC — INV.=622.0 LOT 24 PAD=629.0 A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST ALLSIDE SE RE OT ZS /� FROM THE PREC STATIONED DOWNSTREAM AD-629.0 / \ MANHOLE \ ' 1+� OT 29 LOT Yy _I INV.-622 0� P kD 628. 0 ' \ PAD-62/s/0 WATER MWTO BED 52 Ducn oN ! N0.46 4a"-i 1\ A A.2+80.00, ' RT 0+45 '114LF OVC INV 22 RF (ROAD S C72 PL. 145S.E. �=196.7N it STA.3+71.57, 10.3' LTI�.., -- 1-6" X 45' BEND / / t< -- -- -'\ 1i LOT 23 IN / PAD=62,9.0 �635 L 38LF I INV.eE LF a Pvc� LOT 22 PAD=630.0 10' M\N fI s 0+39 INV. 6" PVC \ �C I 46LF 24.0 I LOT 21 \ PAD=630.0 I \ I LOT 20 PAD=629.0 SCALE: 1" = 20' 20 0 10 20 40 KEY MAP EXPIRES. SEPT. 5, 1999 o< a: J Z W M W Q Z C 0 3 Q N 3 w p. I 8 d V Z 0 co m 0 cl x LL 0//� co 0 z W Y �;8 Z Q �w� J rK J 95-100 PROJECT NO. LEL/DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION 00 co 00 m 3 w QJ W N O O M W H In N Q a W 0 Z 0 M c (o RENSIONS: RENSED PER CLIENT 8-26-97 LEL REVISED PER CLIENT/AU9URN/80NNEY LAKE REDLINES 9-29-97 LEL 511 26 o 1q V o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING, CONSULTANTS O /� A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST v v N LOT 27 0+82 1 LOT 45 LOT 48 / LOT 46 LOT 47 - N 1 IN 29LF 6 PVC 1 PAD=618.0 " PAD=802.0 INv.=595.12 e` PAD=614.0 PAD 610.0 PAD-608.0 p w, ` \ ALL SIDE SEWERS ARE T TIONED , / MANHOLE 1+10 29LF 6" PVC 'FROM THE PRECEEDING D WNSTREAM 0+59 M\ 29LF 8' PVC INV.=602.0 35LF PVC INV.=d03.0 P. - 9+79.19(T) 153� 8" PVC (ROAD i LC N0.3548'0 �,i___- 1z+sz11(A> ". STA B+ 6.23, �tCT. � 1401E � 1 - Rs 8+18. 8. pV < ¢' F _ c x zy'' 24+91.86(L)s. E' N2a 0� 1'E N- 0 D ✓+r ,.� a �3 W' a1 a -. cAAO i) - g^ D.LP ATE (ELXMJj- �, R=2zs.OD' "1a _ - (RO 18OLF L-." N _ SM+( 33 ae"m LOT 2& I \ 6?O S � \� \ PAD=802.0 �4@98°o' 1sTA.83.Y toSSMH NN `iE) 4 -T- 8- GATE VALVES (FLXMJ) _ -1 I� 1 _ PROVVE 2" BLOW OFF I�� I AT LOW POINT 1 N PARK AREA 0,� , LOT 1 w PAD=610.0 o LOT 2 m m m 11 PAD=602. ALL WATER MAIN TO BE CLASS 52 DUCTILE IRON arcs As- 1Ln r BOYo l Ac souer� s M /1N x!ro% SCALE: 1" = 20' KEY MAP IExPIRES. SEPT. 5, 1999 1 N ; O � U Z O M� N W W I O 0 N I X rL Q U. 0 0 M 0 VJ W�0 O Z NN �;7 Z Q1 0 Q �WN J., J rw W Wz � 10 Y F NWI MIL J 95-100 PROJECT NO. LEL/DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION 00 00 m 3 00 J Q w N 0 0 n w D N F Y a a W w 0 0 Z Q 0 M RENSIONS: REVISED PER CLIENT 8-26-97 LEL RENSED PER CLIENT/AUBURN/BONNEY LAKE REDLINES 9-29-97 LEL ?r Si I Z� o. 14 U o PACIFIC ENGINEERING DESIGN INC. CIVIL ENGINEERING AND PLANNING CONSULT��A\ N�(TS OS ) s" i L� T 45 / / PAD=621.0 o+So 30 INV.-615.0 2y 6" PVC / INV.=815.0 H NO. 48"A STA. +27.53� 10LY / X LOT 37 PAD=620.0 26LF �" PVC INV.-6j4.0 / 5"RT i A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST / LOT 38 ro r625_ R1 N �' � 1+55 � / PAD=620.0 a ]7 °° { 3OLF 6" PVC v I `' �' INV.-612.0 35LF VC INV- 0 v 10' LT / 610 a nv 4J 48"m STA 6}1Z§1 10' LT \,,- -s?z\ " PVC . p RRY A S.E. (POAD T) 106 - STA.6+03.72, I RT / 1.e^ rE -------- �=8"—GA V S ZFL�tJr— I STA. 4+95, 5'RT 1-8" GATE X 6" TEPAL E (FL)FLXMJ) S 29LF9LF 6" D.I.P. 1-6" F.H. ASSY. LOT 36 PAD=627.0 LF 6" PVC I _ I ALL WATER MAIN TO BE CLASS 52 DUCTILE IRON LOT 35 PAD=626.0 ALL SIDE SEWERS ARE STATIONE OM THE PRECEEDING DOWNS AM I I ' a LOT 45 ° PAD=618.0 I °° n SSMH NO.48 48"0 I Q LOT 34 PAD=625.0 SCALE: 1" = 20' 20 0 10 41 KEY MAP wPlAas t,10 A IN A A DY OOYO{ A AetiATLt N 3 W I IL v 0 0 0 � LL 0 al co Wo z z ;0 Q IWN F7.. J Lu �wz cNM(L 95-100 PROJECT NO. LEL/D8 DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION r a n x 0 n rn n I r� a 0 zz 0 x a 00 ro 00 m Q 3 .i JQ W 0 0 w N Of a w O 0 Z Q O M REVISIONS: REVISED PER CLIENT 8-26-97 LEL REVISED PER CLIENT/AUBURN/BONNEY LAKE REDLINES 9-29-97 LEL '�,F S1-1 Z3 " 19 U PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST na i SCALE: 1" = 20' KEY MAP tlQl Q W Z WIL Q J Z �Q :. 0 3 Q N 3 d c� M— m W 0 0 N x Q LL °oa w�0 Z N Q D 7WN rmw W C)JZ Nmd 95-100 PROJECT NO. LEL/DB DRAWN BY 6-10-97 ISSUE DATE 9-29-97 SHEET REVISION REVISIONS: REVISED PER CLIENT 8-26-97 LEL REVISED PER CLIENT/AUBURN/BDNNEY LAKE REDLINES 9-29-97 LEL PF 51"1 Zq 0r 34 U I_. o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS o a, C X 21/4" w •Tr•ruce •e eu,ww f M. NOTES: 1. MATERIAL IS CAST IRON ASTM A48 CLASS 30. 2. SEE DWG. NO. 2-018 FOR VANED GRATE. 3. PATTERN ON TOP SURFACE OF HOOD SHALL BE 3/16" 4. BOLT, WASHER, AND NUT SHALL BE GALV. OR CORROSK 5. SEE SEC. 7.05. THROUGH -CURB INLET FRAME SCALE: 1 "=10' 10, 2, UTILITY EASEMENT R/W 145' NATIVE BACKFILL ITEL/CANLIGHTING CONDUIT GAS P UTILITY TRENCH 8" PVC STORM DRAIN J I TEL/CAN k POWER (FOR LOT STUBS) 2' WIDE X 3' DEEP (MIN.) LJ---,— GROUNDWATER INTERCEPTOR DRAIN (IF REQUIRED). SEE DETAIL, THIS SHEET. UTILITY EASEMENT SCALE: 1 "=2' 23" 54 3/8" t3l 3/8" EXPANSION JOINT 16" 31" MIN. 5, CLEAR WIDTH A AMOUNT ON PEDESTAL PROVIDED WITH NDCBU CUTLER MODEL N.D.C.B.U. UNIT CB-12 OR EQUAL I TRG P PLANTING SN1DTH ANCHOR BOLT PATTERN 0 TO PER N.D.C.B.U. PEDESTAL ., L—1 A. 3/8" FULL DEPTH 5' a99I 5' 8' 231�1/4" SEE NOTE NO. SEE NOTE NO. 2 12-3/4" 1'-6" FACE OF CURB NOTES: FRONT SIDE PLAN 1. SEE SEC. 5.04. N , T. S. 2. INSTALLATION OF N.D.C.S.U. (INCLUDING CONSTRUCTION OF BASE) WILL BE DONE BY U.S. POSTAL SERVICE. 3. SEE SEC. 3.04 FOR JOINT REQUIREMENTS. NEIGHBORHOOD DELIVERY & COLLECTION BOX UNIT (N.D.C.B.U.) INSTALLATION SCALE: 1 "=20' DEPTH AS DIRECTED BY CITY OF AUBURN OFFICIAL, DEPENDING ON FIELD CONDITIONS CONSTRUCT PERMANENT INTERCEPTOR SWALE ABOVE TRENCH AS DIRECTED BY CITY OFFICIAL IF SURFACE FLOW IS PRESENT. SWALE SHALL BE AT LEAST 1.0 DEEP WITH 2:1 SIDE SLOPES AND SHALL BE LINED WITH 2"-4" RIPRAP. SWALE SHALL DISCHARGE INTO PERMAMENT STORM DRAINAGE SYSTEM. 10' UTILITY EASEMENT r DRAINAGE SAND h GRAVEL 8" PERE PVC — SUBSURFACE DRAIN R/W WASHED 3/8" PEA GRAVEL MINIMUM 8" ABOVE, 4" BELOW AND 6" ON SIDES OF PIPE GROUNDWATER INTERCEPTOR DRAIN ARM 4, 7 - '"ov SPECIFICATIONS FOR DRAINAGE SAND k GRAVEL SIEVE 512E 7C PASSING BY WEIGHT 1-1e2' 100 3/4 90 TO 100 1 /4' 75 TO 100 NO. 6 65 TO 92 NO. 30 20 TO 65 NO. 50 5 TO 20 NO. 100 0 TO 2 (NON PLASTIC) • BY WET SIEVING SCALE: 1 "=2' APPROVED : w 1.20.13 DIRECTOR OF PU WO (S DATE a fsspNASlcf��� A w� EXPIRES. SEPT. 5. 190 1 95-100 PROJECT NO. DB DRAWN SY 7-03-97 ISSUE DATE 10-07-97 SHEET REVISION Lo n m n I Y 0 am n I r%1 a 8 N W z 0 a m 00 rn I Li En Y a K z z a 0 REVISIONS: REV130 PER PIERCE COUNTY REDLINES 10-07-97 LEL FF I, 1 _. " ]4 U o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS ps��8 1 !%1` I A' MPT' J-=L AA•r TfY7t/� afTAl BACK Q SVEOLK CP[R/.tM roL1A1BRA r1EAV !. I, AIRIRW ALAW RAM^ WM T 4rE W mr NO m5 CLAIB RAM B._I- 1 s'-e` NwJBnAI �•_ • r-r• LeA�R cmle J• G1.Pe RAM HAM DF 90EWK II •A NOR mm.. CAAB RAMS AW TNKALr AAW RAW LMwMA A M 1/I RA P M- WM LR'QSWLKs SQ MMO !' JfNMAI A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST BACK W PIYMI.K -� I 11 1' "LR"1 —\/\ //3,i«. PBEWJLK` N N n nAAs s LYI. WRN dR I IMIll AND RAN IS rIPrGAtLr COCA � Ai IIE YBPIINr II BACK Q I' M AMOLAMW/ T RAW ALZFBN&nff . Jf• COUNTY(WT TO SCALE. cum RAMPS PIERCE NOT TO SCALE 3'M1' a Fr rrr ;nn D E.bANPLW XAWT AS APPLICABLE LK 5' me' SIDEWALKS NOT TO SCALE s'MP J/e' exPANsnW Awr - IIAfAfN CIXY' 1/]" r0 ML QPM . . 0I AOMQNT CLI6. QI(Nr CCNGif- BA. CAM AM W F" At wMmImall A$%kT LYi ff PAWN T CUSS B. J' C ACRD XPM .11RMRN (NOT M SCALE) PIERCE COUNTY STD. DTL. PC.F7.1 LILARS I L . • " '' f f ' NDIRRR'NI J r J- ,.'. . <• W JY PAKLENI I . I ,. 1 NARK GRA.NO !1' MTES, ! 1 I ..,. . . . J < P ALLL wBC CUT Ar M(MNCNI NA WPAKNNI •. •. CWRCACOE i . '.. ,. L ', I IWM CK HE P31 f MbCw Nr A" A I •• \ . •,. CNCASEILNT PALL /F PIAPED MA AANEwR Q B' I •�. 1 J , J '. J 111E MASS JR)RAwNr WLL BE YI RASS DURM'G IhE PLAQIRNT a CARCKEIE _ _ Imo— 0 IaB�R (NOT TO SCALE) STANDARD MONUMENTS PIERCE COUNTY STD. DTL. PC.H1 NOT TO SCALE .ti NOT TO SCALE b � MTrs Imo. R r) RAISED PAIRON ro �> 1/-R i'R PKAW QAC�RAQD 3 I/Y AS A PMT Or T[ MAD PAWWNL •' O J e 1� r r e.i e' 1_ e I rL I.I D. I-O^IIpGL __,JI rae W WM W PDYAM PLKIYALK �r �� fJVY 1 fIe PIERCE COUNTY STD. DTL. PC.F8.1 R r d my LR.F' \ \� PA IRK. LAWT \-• l.OR \ \ W r � JIB' [APANPM Altar AS APPLICAHE \LWX C[WJTIr (WE MI \ 6L�YFNI CWCREIE \ \ � p)�IIALE�DDRM 6 LYMB NNY ..-•�, \ MILT( rIACIfFNED ED X pMWWAY TO ML DEPM (W �107dV A -A SlY` PAM�YCNON1fWAY � �"'- In[NI COAtlPFTE BAARRR � I LlAls N.O GV iIER WWS' ND IES: QNQ'I QJJENr C AE1E CA'IRNI V I - ONIEWAY BIRIER GdKXw I) (YMI: WIY IIpM . I!' MWMIN ID IS' NAxBA.W 5' M 6' BARRIER C" I) M1KMY iM . re' AeIMW TO TS' LIAAwRAI PA IR'MR'N/ SIYIIRLN M JO' NAARIIAV FM lMfc CAR CMAQ p! LOCAL ROAD. AM mrTR .TOE�K M .10' WAMRIN FM ilfl[I LAR GMAQ OW LOCAL ROAp. }) MI WY PA WAG . 5' ITMAY QNCNT COWAEIE M f VAR,FS Y r/] ' PAWD W LKMAY ]' MNMRI CL ACSED DEPM A9•IAIr COIR.KCA. CLASS B. y '•' t) M1N11MY PAMVC . e• MMMI.W Q11LNr RMl}ER A LEIENT Kryfl1[R VARICS OIR1P I' MWRAI QPM OPUPRD SIxIFAOrIC TOP CdAq VARwS V , 51QBRLK M: ]' AeMW.W CCRPACfiO OEPM ASPNALr CeAV1(R. QASS p B, Y. 40Tj1 R )• JIKTRNDJPM CROSWD SOATACA,G RAP C , R PAKD MLKRANU (S 5' M 6 16 LP WE k J) T IA*F� 1[ 6 O L`�� I/.• i JI LF IIE10`Ir III'. ty I) SMmAW OMNNANARWQ DRRYN SIAwFEAQ, rWH.ELLSS MACGTYaxW PwDAVFdrPEOW roDESIGN }y ., fiDlYl IMMr AMTRO APPROVED GADWAKWI T 01 MAW MW WMOWAY S ACE, LNLESS ACCd WD rM W PCs.'1Y q[ MT[ 6 !) OMKJIRY P L AKAIWLr K Ar W MWES TO R D QNTI1 . '•k !) MnEWIr PIML RarALLr K Ar )D aarECs ro RMD QNrTRLK DIRECTOR OF PU 5 DATE wr CAN wRY m n wow" ro w QCIICES MAX lKAK PCWI - A.� BUi CAN VMY ARLRI )5 Y W A M SD Q01EES e)�Al'CY1M[NOEO NAARRYI MAlwS ./- ISR BEYOMI MADE BR[AK PCW). J _.•� HIIRCAL q WS Mr M CK ED A J I/I INCH CREST M A 2 AVLYI LONG A.S 4Aw OF RAM eJ ACLY.ABMLD YAxWW MADE! A ISR w M MADE eAEAK PONT. SAG W A 10 r00r CIIMO. SAC W t L10 FW MI N CAaLD A J III Wpr CIIESI M A S RKTI (NOT To SCALE) (NOT ro SCALE) SAC W A IO roor [rKAO DRIVEWAY PIERCE COUNTY STD. DTL. PC.F2.7 DRIVEWAY W/ BUFFER PIERCE COUNTY STD. DTL. PC.F2.8 (mor ro SCALE) REM710 & XXXX Arta i Q WAY LKk NOT TO SCALE RAM ICXr — (gE�'lM NOT TO SCALE o PACIFIC E NOINEERINO DESIGN INC. o a 8 0 co 0 0 �88 YpJYJ Z o Z Qo n J 95-100 PROJECT NO. LEL DRAWN BY 11-24-97 ISSUE DATE SHEET REVISION CIVIL ENGINEERING AND PLANNING CONSULTANTS on 18GS a 10A or w(f :.jY,BGRAOE PwE ERNE M MIaEt AY1E 8 ) RAW1A]A2A51IC PIE (SEE Nort J) FOUNDA RON J I'r ■ � 3 LELEL — IO' Dr W (SEES N \ AWE AIt ✓ ), L MIYBat OPAML MLWEIL FOP ME A'YF XaMIG I MEMANLE KWEN PARS FOP NULINYE IItIKLAMN5 PBE 9}E NSIANCE BETWIFN aN s IE- (NAYEIER) ANEIER / } HOS' TO Ib" 4a' ME1K ONLY IJ' ro HIS- AMERW / t (SPA) IIa- ro SOD 4a, IO^ W S(WORAH PACE A aACNFA GRAM FOR PII EDxr e Fn4Xo.Im t[kT A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST E I (i[ I1VR r/ l' / %W \ w-' � q u MOM RIP W SLartEAW BELASOM wl`� ''1 NOTES /— •\ / \' I) WATCH IIVM SHALL DE AS 5WC"D :.�\. N SECIKN J-a 4 O" DI£ STAMMAO 9EOFMAMWS y PPE ZO'K AM0,1Yl t) Krr IX I£ WSHALL EVILIP( ,. $ i r0 5PRN1G LAE �• : ti MAWS MOBIL FLIP J) WiXNWC MATMAL FOR 11(AWLXEASW ME EDIK aEDANB POE S AU WAS SPEOCED N SECKNO 6-0..16 OF ME STAMMW FOMAIIIw LENL L '.�: _ SPECVXZA IKNS. /Q6pA RLWp 4) PIPE PONE AACKRL SNKL W AS LEM . SPECVIEO N SECFKN ZIM93) OF THE SrAA.eARD SAEOFOCAAOYS CNNVCJRRT♦E AAD ant . AOIETAL LPoc (NOT To SCALE) PIPE BEDDING PIERCE COUNTY STD. DTL. PC.B9 NOT TO SCALE POND ILEAC STRUCTURAL PILL A' CIIISI® ROCK COMPACTED 70 95% OF ASTM D-iss7 HART 1r = 10' MAX&I N UPPER S TO 4-3 MAN ROOM LOWW r TO E 4-6 MAN 11OC= M/ PBM LNPNTL em OR fflAtcTUMt. FIL GEOGRID ROCKERY NOT TO SCALE r 13 W HOOP " Nr 2 13 aM HOOP FM If TYPE 1L CB NOT TO SCALE II91La 3 GEOGRID A®I10pcmlr LAYERS, T3 FEET BET'TIffJt u1rERs Q QFM UR40TH-CAN (Fr) D ft-- —� 40 WAM I TM P WVgM= ISSD PMC PIPE ISN1 4r DOMR Jr B OF r WASHED R0CT4 MN 1% OONTMMDID SLOPE To OUTLET NOT TO SCALE ASSOC. EARTH SCIENCES, INC. iRWr AA[) ORATE SIX SEC. 705 AW APPLYARIE DOGS. Ir MSOI SECTICC 203 M NDOP 13 M EAPI eeR4n1 113 M EACH EDE 3' SPAONL A 1/4' MAW A BRAS OALYAM}EL mu w/ 1414 R NOTES' )) ALL STEEL PM IS IOW DM VAMEED TRASH RACK NOT TO SCALE 4 EA 1/4- X t- X a' SMTf LIIwIY SPAL'ED ANW RELDED M JA- MANE cur w AMEN scirst E PIERCE COUNTY STD. DTL. PC.139 NOTES I . Contractor to verify all dimensions, elevations, and setbacks in the field. Any variations are to be immediately brought to the attention of the geotechnical engineer. 2. Contractor is responsible for worker safety, shoring and bracing, and erosion protection. 3. Geogrid reinforced fill is to be placed print to construction of the rockery. A temporary form is recommended to maintain the shape, line, and grade of the reinforced fill face during construction. 4. Grogrid reinforced fill shall comply with the pond berm for structural fill and shall be compacted to at least 95 percent of ASTM: D-1557. 5. inspection of subgrade, placement of base course, drainage, geogrid reinforced fill and finished rockery by the geotechnical engineer is required. 6. Rock shall be sound and have a minimtun density of 160 pounds per cubic foot. The long dimension of ail rocks shall be placed perpendicular to the wall. Rock sizes shall be graded from 3-man to 2-man top to bottom. Each rock shall beer on two rocks in the ner below. Rocks shall be placed so that no open voids greater than6 inches in any direction exist. After setting each rack course, all voids between rocks shall be chinked from the back with quarry rock to fill any void sufficient to pass a 2-inch square probe. 7. Geogrids are to be Miragrid 5T, or equivalent, approved by the geotechDical engineer. Geogrids are to be installed in accordance with the manufacturer's recommendations. GEOGRID ROCKERY NOTES ASSOC. EARTH SCIENCES, INC. NOT TO SCALE NOTES: 1, CATCH AASM SIILL BE CONSTRUCTED IN ACCORDANCE WITH ASTM C479 (ASHID M 1") A C890 UNLESS OTHERWISE SHOWN ON PLANS OR NOTED N THE WSDOT/APWA STANDARD SPECIFOCAnONS. 2. AS AN AOCE►TABLE ALTERNATIVE TO REBRR. WELDED WIRE FABRIC WORD A AEI. ARFA OF 0.12 SOUlARE INCHES PER FOOT WAY SE USED. WELDED WIRE FABRIC SHALL COMPLY - TO ASIM A497 (MSH10 M 221). WIRE FABRIC SHALL NOT BE %}LEA N KNOCKOUTS Ir REDMC SECLW J. ALL REINFORCED CAST-N-PLACE CONCRETE SMALL BE CLASS 4000. 4. PRECAST BASES SHI BE FURNISHED WITH CUTOUTS OR KNOCKOUTS. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2' MN. ALL PIPE SHALL BE INSTALLED N FACTORY PRO4IDED KNOCKOUTS UNUSED KNOCKOUTS NEED NOT BE GROUTED IF WALL IS LEFT INTACT, 5, KNOCKOUT OR CUTOUT HOLE SIZE IS EQUAL TO PIPE OUTER DAM. PUTS CATCH BASIN WALL. THICKNESS. 6. KNOCKOUTS MAY BE ON ALL 4 SIDES WITH MAX. DAM. OF 287. KNOCKOUTS MAY BE EITHER ROUND OR 'Cr SHAPE. 7. THE TAPER ON THE SINS OF THE PRECAST BASE SECTION AND RISER SECTION SHALL NOT EXCEED 1/2'/Fr. PRECAST RASE(MEASU5CC1%RI AT ME roP B. E CATCW� BASIN FRAME AND GRATE SH%UL BESIANDIM or niREMEW WAsp t SPECIFICATIONS AND MEET THE STRENGTH RE7IKREMENTS OF FEDERAL SPECIFICATION RR-F-621D. NOTING SURFACES SHALL BE FINISHED TO ASSURE NON -ROCKING FIT WITH ANY COVER POSITION. 9. FRAME AND GRATE MAY BE INSTALLED WITH FLANGE DOWN OR CAST INTO RISER. p M D[CII I 10. MAX. DEPTH FROM FINISHED GRADE TO POPE INVERT SHALL BE 5-D'. 11. EDGE OF REDUCMG SECTION OR BRICK SHALL NOT BE MORE THAN I- FROM VERTICAL EDGE OF CATCH BASIN WALL. (NOT TO SCALE) ROCK LIL 1 MAN 100-300 2 MAN 300-800 3 MAN 800-1500 4 MAN 1500-2200 5 MAN 2200-4000 APPROVED DIRECTOR OF PUE1 C. M!0 tS DATE J EXPIRES: SEPT. 5, 1999 1 L U Q D0 Q W IL ro w rn 3 Ul QJ W In 0 0 Ld D (n in Y Q C. (r O Z Q O M 95-100 PROJECT NO. LEL DRAWN BY 11-24-97 ISSUE DATE SHEET REVISION REVISIONS: xxxx PF s I 3L n aH II o PACIFIC ENGINEERING DESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS psD Is&S A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST, W.M. T.P.O.B. T.P.O.B. TRACT "A" FACT "F" 31 N 88'34'43" W 1299.22' EXCEPTION T.P.O.B. --{ 1-{ 19.43' 1 4` L-24 L- 6 \ L_4 N 88' 34 43 W 1279. 79' TRACT "B" -� 19.77' I 1.6{ 850.83'1 32 825.93' _ L-52 AF #8808310335 L-� 16 .612 ` C_2 S 8834'43' E 788.61' L-51 L-49 C-8 6 15 - f L� 3 L-50 C-9 _ �5 TACT F <1 TACT "A" C-7 �- 0 0.71 acres NW CORNER LAKE TAPPS L-41 L-4+# \ LARGE LOT SUBDIVISION #670 0 = 12'39'40" p = 12'39'40" C-6 C-1 \ MONUMENT IS 0.11' SOUTH OF T.P.O.B. I h� � �..� � = 37'44'40" � �. R = 1470.00' R = 1530.00' L-� R = 430.00' (SEE PIERCE CO. SP.# 81t1190,33) w L = 324.84'4.,. L = 338.10' C-5 V� L-39 S L = 283.2T I (DIV.2 PH 1 )L-38P. L-17 r s.0 4.62 acres- = ! �' L-26 uS-,�iP o ,J...o, ... L-37 L-18 w F, 00 �O � .3 3 o0v'- ... C-4 h 0 ��C,E2gc�1225 0 'L-19 T.P.O.B. TRACT „C„ cam, _ �� OCf �o o L-28 CONTINUATION Z n g 1,2� SEE DETAIL A --, C-13 ;n o L-29 o N L-27 L-45 z C-14 WEST LINE OF LARGE I z L-21 J L-47 LOT SUBDIVISION #670 I zo L'i SEE NOTE 1 L-46 A = 1431'22" / w 1-22 R = 771.00' cn 00 T.P.O.B. TRACT "C" L = 195.43' Lu Ln co TRACT "B" r to L = 14'20'46" v I N 0 R = 689.00' cc z L = 17252' (DIVISION 1) to TRACT �C� 50.04 acres Z w 80.28 acres N �It o ZI Lo 00 n w m N 0 z Li 00 Z DETAIL "A" NOT TO SCALE �y C V� AF# 9501190204 y �� °oo .sue F •����, � L-37 C-4 �J L- 28 - L-14 L-29 L-19 C-13 { T.P.O.B. TRACT "C" C-1 C-3 CONTINUATION -'-L-20 L- 45 S 59'13'28" W C-14 L-15 82.03' L-16 L-46 L-47 p = 14'31'22" R = 771.00' L = 195.43' T.P.O.B. TRACT "C" A = 14'20'46" R = 689.00' L = 172,52' S 88'34'36" E SOUTHWEST CORNER OF T,iE NORTHEAST QUARTER SECTION 6 REVISIONS: XXXX NOTES 82 Op. W S j573 36. 2054.65' 2574.66' 1. EXCEPTION AF# 2891243 IS BASED ON THE NW CORNER OF LAKE TAPPS LARGE LOT SUBDIVISION # 670. 2. REFERENCE RECORD OF SURVEY # 8807280259. CURVE -TABLE CURVE RADIUS LENGTH DELTA C-1 35.00 54.98 90'00 00 C-2 1030.00 16.98 00'56 40 C-3 35.00 51.49 84'17 42 C-4 35.00 54.98 90'00 00 C-5 30.00 47.12 90'00 00 C-6 25.00 36.99 84.47 03 C-7 475.00 43.24 05'12 57 C-8 235.00 i53.50 37'25 32 C-9 285.00' 154.38 31'02 07 C-10 25.00 35.22 80'43 06 C-11 30.00 47.12 90100 00 C-12 370.00 243.74' 37'44 40 C-13 35.00 51.49 84" 7 46 C-14 35.00 58.57' 95'52 50 GRAPHIC SCALE 200 0 100 200 400 1 " = 200' ALL INFORMATION CONTAINED HEREIN IS BASED ON THE LOT SEGREGATION PLAN PREPARED FOR THE L.AKELAND COMPANY BY DATED . UN E ! 'NE I DIRECTION DISTANCE L-1 S 03'26'36' W 48.22' L- 2 S 7629 49 E 18.99 1 L-3 N 89'32 03 E 136.65 L-4 S 04"11 06 W 17.53 L-5 S 29"17 48 E 5.34' L-6 S 01`1819 E 111.57 L-7 S 63.47 35 W 44.14 L-8 S 4531 31 E 63.43' L-9 S 24'20 35 E 20.88 L-10 S 60'58 23 E 65.47' L-11 S 13'49'52" E 39.60' L-12 S 57'30 00 W 150.00 L-13 S 872216' = 13.74' L-14 N 55'00 00 E 8.02 L-15 N 35'00 QO W 49.54 L-16 N 55'00 00 E 60.00 1-17 N 55'0000 E 166.23 L-18 N 53'05 27 E 150.0$ L-19 N 55'00 QO E 206.98 L-20 N 29-17 46 W 10.16 L-21 N 10'35 04 E 100.00' L-22 N 79'24 56 W 7.50 L-23 S 47'39 40" E 98.20' L-24 S 88'34 43 E 64.77 L-25 N 10'3414 E 50.29 L-26 S 7924 56 E 207.50 L-27 N 79-24 56 W 200.00 L-28 S 29'17 46 E 12.34' L-29 N 35'00 00 W 195.35 L-30 S 02"17 00 E 143.00' L-31 S 08'39 24 E 229.04' L-32 S 75'13 36 W 59.23 L-33 S 41'30 00 W 240.00 L-34 S 24"16 49 E 21.34' L-35 S 31"0158 W 20.64 L-36 S 47'39 40 E 28.98 L-37 N 55'00 00 E 215.00 L-38 N 56'54 33 E 150.08 L-39 N 55'00 00 E 23.23 L-4-0N 35'00 00 W 52.99 L-41 N 29-47 03 W 50.00' L-42 S 88'34 43 E 51.68 L-43 S 35'00 00 E 54.77 L-44 N 55'00 00 E 33.00 L-45 N 55'00 00 E 228.95 L-46 N 35'00'00 W 64.00 L-47 N 55'0000 E 215.56 L-48 S 01 -0147 W 75.00' L-49 S 80'35 49' W 178.39' L-50 N 88'34 43 W 80.00 L-51 N 78"13'03" W 122.55' L-52 N 47'39 39 W 132.00 /T.P.O.B. TRACT "E" SOUTH LINE GOVERNMENT 3 L-13� SOUTH LINE GOVERNMENT 4 2652.25' `/ 1 L-12 .1 N 89'54'50' E 1638.38' L- 35 L-1 S 89*54*50" W 1013.86' L-34 SW CORNER OF GOVERNMENT LOT 4 L- 33 OF SECTION 5 ( ROS# 8807280259 ) d = 127'34'07" R = 100.00'------ - L- 2 L = 222.65' / / A = 75'26'30" R = 100.00' L = 131.67' C I N TRACT "D" L-„ L-10 L-9 lin (DIVISION 3) L-8 0 L- 7 50.98 acres SOUTH LINE OF THE NORTH 1/2 OF THE SOUTH 1/2 L-6 TRACT 5 I N 89'32'03" E 1182.52' L-4 �L-3` 24.0 acres L-32 N 80Ld '00'00" 500•p0' I - 1319.17' 1 0 = 04'46'24' R = 1970.00' 00 L = 164.12' _ ao T.P.O.B. TRACT "D" I:d "WEST LINE SE 1/4. SE 1/4, O NW 1/4, SECTION 5' p' z � O 3g9,0 w WEST LINE SE 1/4, SW 1/4, N 7 p0'pp" L-31 ;) NW 1/4, SECTION 5" `� N � Q rn s Q Q� o L-30 N 89'09'03" E 656.14' S 88'34'36" E 520.00' N 89'09'03' E 656.14' 1 SOUTH LINE OF THE NE 1/4, SEC 6 (D Ln uNP�-A ED o'o W Lu C' Cn APPROVED DIRECTOR OF PUBLIC WORKS.,! DATE o PACIFIC ENGINEERING DESIGN INC. a, n N N t, MR 1 CENTER SECTION 5 I = SEPT. 5, 1999 Q Q Z 0 m n 0 a U 0) W I U CL W (L Z 0 ra Vo I` 0 D o (o 0 LL It " O Ld0< Z Uzi Q ZQ3� � 0 W YCqW� JNJO W N Ill N 95-100 PROJECT NO. LEL DRAWN BY 11-24-97 tmlmlmm i SHEET REVISION 00 00 00 Q) Q w Q w 0 O ro w t 7) W Y 0_ a 0' w O 0 Z Q O co@ CIVIL ENGINEERING AND PLANNING CONSULTANTS oome&r ). Q+ O 3 w U J J 0+00.000A) V.I �[IAL 53+05.26 (LAKE) \ — — — — — ----� i I CHANNEUZATION NOTES A PORTION OF SECTIONS 5 AND 6, TOWNSHIP 20 NORTH, RANGE 5 EAST 711 8" SOLID WHITE GORE STRIPE WITH DOUBLE ROWS OF TYPE 1 (WHITE) RPWS O 10' CENTERS LTI 40' BREAK IN 100' MINIMUM NO PASSING STRIPING APPROACHING TAPER 80' is' 72' .8(LTI) LT, s (W)(52) >< (6)(30 2) _= 90' .2(LT1) 60 60 INSTALL ONE ARROW AND "ONLY AT BEGINNING OF 8" GORE STRIPE 3 N7513'36"E 62ND ST. S.E. - - r -305.17' F (ROAD A) ' U 00 I I 1 �. I Sap' 30' \_DOUBLE VDOUBLEJYELLOW WITH DOUBLE ROWS YELLOW WITH DOUBLE ROWS OF T'P 1 (YELLOW) RPM'S O 10' 1 OF TYPE 1 (YELLOW) RPM'S 10 3' CENTER$ (ONE ON EACH STRIPE) I CENTERS (ONE ON EACH S71PE) DOUBLE YELLOW WITH DOUBLE ROVJSJ OF TYPE 1 (YELLOW) RPM'S O 40' CENTERS (ONE ON EACH STRIPE) 1. GENERAL. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE 5. STOP BARS. 18-INCH STOP BARS SHALL BE USED UNDER THE REQUIREMENTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL FOLLOWING CIRCUMSTANDCES AND SHALL BE CARRIED ACROSS ALL DEVICES (MUTCD) AND TO THE WASHINGTON STATE DEPARTMENT OF APPROACH LANES WHICH ARE REQUIRED TO STOP. TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND ALL (A) ON ALL APPROACHES TO SIGNALIZED INTERSECTIONS WHERE MUNICIPAL CONSTRUCTION AS ADOPTED BY THE COUNTY. "ONLYS", MARKED CROSSWALKS DO NOT EXIST. STRIPPING SHALL BE PAINTED. ALL ARROWS, CROSSWALKS, AND STOP BARS SHALL BE DURBABLE REFLECTIVE (8) ON ALL APPROACHES TO MULTI -WAY STOP INTERSECTIONS WHERE PLASTIC MATERIALS AS APPROVED BY THE COUNTY TRAFFIC MARKED CROSSWALKS DO NOT EXIST. ENGINEER. 2. CENTER LINES. CENTERLINE STRIPING SHALL BE USED ON ALL (C) ON ALL APPROACHES WHERE CHANNEUZAT10N EXISTS AND ARTERIALS AND ON ALL UNDIVIDED PAVEMENTS OF THREE OR MORE MARKED CROSSWALK DO NOT EXIST. LANES, TYPE 2YY RAISED PAVEMENT MARKERS (RPM'S) SHALL BE OF TWO-LANE MAJOR AND SECONDARY 6. REMOVALS. ALL EXISTING PAVEMENT MARKINGS THAT ARE IN INSTALLED ALONG CENTERLINES 80 FOOT INTERVALS (40 FOOT INTERVALS CONFLICT WITH NEW PAVEMENT MARKINGS SHALL BE REMOVED. ARTERIALS, SPACED AT ON HORIZONTAL CURVES HAVING RADII OF LESS THAN 5,000 FEET), AND CENTERED BETWEEN SKIP STRIPES (WHEN PRESENT). FOR CENTERLINES OF MULTI -LANE ROADS, DOUBLE ROWS OF TYPE 1, YELLOW RPM'S (ONE ON EACH STRIPE) SHALL BE SPACED AT 80 FOOT CA 9eE A• LEFT TLv*, POCK6r FROM TWO-WAY LF T LAW INTERVALS (40 FOOT INTERVALS ON HORIZONTAL CURVES HAVING ON !!rw[ wm uarar rl°ws a• r mrr ll F w'RADII B'SHEET rwsi OF LESS THAN 5,000 FEET). (SEE RPM LAYOUT DETAILS far a1LAgr 2.) =RVM-,- !myn'"V 3. LANE LINES. LANE LINES ON MULTI -LANE ROADS SHALL BE 10rmraw STRIPES EACH WITH FIVE RPM'S DELINEATED BY PAINTED SKs recR smwp INCLUDING THE USE OF TYPE 2W RPM'S SPACED AT 80 FOOT runt ra1W;A rm Lr !I 115 /U IR/MWY) S"9trDl INTERVALS (40 FOOT INTERVALS ON HORIZONTAL CURVES HAVING `°r`NCYs'a'ir irww r RADII OF LESS THAN 5,000 FEET). (SEE RPM LAYOUT DETAILS ON CAW �• a Lr. rer+cm a A SHEET 2.) 4. EDGE LINES. EDGE LINES CONSISTING OF A 4 INCH SOLID WHITE LINE SHALL BE REQUIRED UNDER THE FOLLOWING CIRCUMSTANCES AND SHALL BE CARRIED THROUGH PRIVATE DRIVEWAYS AND PRIVATE ROAD APPROACHES. 3+05.17 A0+00.00(L) NOTE : ALL STRIPING `WILL BE PERFORMED BY PIERCE COUNTY. THE COUNTY SHALL BE NOTIFIED ONE WEEK PRIOR TO ASPHALT OVERLAY FOR APPROPRIATE SCHEDULING. CONTACT : W1L BRANNON, TRAFFIC OPERATIONS CENTER. TEL. NO. : 531-6990 Jk`malA o Aewrow AwIMvrLM raw tgr nwr POdQre (A) ON ALL MAJOR ARTERIALS, WHEN MINIMUM 11 FOOT LANE u"'E � Le' "'"" "" """' "'"' """"' "'"'"' "••'" "•'- —'__ r.) WIDTHS CAN BE PROVIDED EXCEPT WHEN CONTINUOUS RAISED° 11eT pp1rw n"°4w� red A rowrr lrAcw �`P'r "'"" ar `n' "'"" wet w wrt rnu .,, Ir rur rr•W ,y rcrr Irmw r ArawE EDGE CURB OR CURB AND GUTTER EXISTS ALONG THE I 5 "' ""'Tr' A �� 'r"'"" !'�^Y'""lur a.MJ ARTERIAL.+ 50 d C ••I' m tar ww >vv rmr m rtrr u° rrrr »e «rr u° rrrr nrae r .,wlols (B) ON ALL URBAN SECONDARY ARTERIALS AND ALL RURAL roP°Lr m °a�,rr AOWS M mrP.r ruw rME floMa races ro er xwwwAP er ux r.wwArA Nr.VR Mx. W rR1 SECONDARY ARTERIALS WHICH HAVE A POSTED SPEED LIMIT OF (E rpr 1 ppy a �' ca s a+t"ar srwwq _ :alr.wr rr - _ _ 1•r [rrr GREATER THAN 35 MPH, WHEN A MINIMUM 11 FOOT LANE WIDTH cnsE ro• neawrr rwM AGD LAK r °"`"'wJ PrnMar _ - . _ _ rn rrrr ro rv, rrrr •.+ar"aa�.rew"w '"a r' r' CAN BE PROVIDED, EXCEPT WHEN CONTINUOUS RAISED EDGE, (°er a vnKKMr ilr-wroA'�r'i10 ••• wnAlr emit J.r M Mf ,l t- rs rLR` mM rKr rrr i. CURB OR CURB AND GUTTER EXISTS ALONG THE ARTERIAL. I (C) ON ALL PAVEMENT WDITH TRANSITIONS. wKl aroY • — - - - (Nat To SCALE) (D) ON ALL MAJOR/SECONDARY ARTERIALS WHERE IT IS DESIRABLE cw tour r u+c rWr TO REDUCE DRIVING IN PAVED SHOULDERS. PAVEMENT MARKINGS PIERCE COUNTY STD. DETAIL PC.H2.1 NOT TO SCALE N75'73'36"E 215.17' 14' 1 14' SCALE: 1" = 20' KEY MAP APPROVED : DIRECTOR OF PUB S DATE uul/gm gllgqqt111 Illlill'g11 11111111111g1911111rl11i 1111 IIP;IIIJIII � 111111111111111111111J111 11111111111 IIIIt111pA1!•9•!•• 111111111111111'.IIIIIgII umm1kq mm�:nl::nnw uuummurwumu F4 � 151111111�1 Ilr dlll ll'.I11111111 Illllllllllllllllllllllll �•� 1 1 /11111111111 Illllill.+11111l1•I IIIIIIIIP91.:•r Illua � .I w. w � p a � ill llllli. 119111111111111111 IIIIP',111111111 Illgll } 11111111111 IIIi1111::11111!1411 IV:dul 1111111 1111111 ' �T� � n 111111 IIII Illllalllli llllilll IIIIIIII'911111 Illgll (P-61f Ilitlllllll .IIIIIII:11111illllll 11'111111111:g11 1111111 I,. iw•eS M 11111111111 Illl! . IILgIC'llli•'1 1111111 IIHIUIIq 1116 11111: It 1160111. 1111111 I' uuuglu nw quul.ugcgggggl 11111 111111111111t1111 11111 1111111l111111111 �qL. �jNp Illllllllllllgll IC� � M �I IIIIIIII IIIIIg11 ,,, ,=t�,, k5!IW 1 1 FFF���III11W 11111111111111111 s- V+ rwr T rww a eo' 4- r[<!ow srmrt ((Ao cM wsttas A, LwMEs o •. cAP I)I Iw C MESS INW S.�a rCOr aALYI/5J O "' 1n RPM 0 o I rn I Jp I o R- YELL J` I' YELLOW SraaY 1•�•Y (pA[55 o1H[RNIY SPCGFKL — 1 r' ari aP•I 4' GAP O_--- MELLOW srfir'E r Iw'E 1 S IN'[.I rO e,O r I lf1�PE TYPE yl�rw£T. �' drrE'Cmv _/ ♦' YELLOW sraPCMEN ��ya�®7��•�® OF MAETIC GAP �� < STRIPE EMUS 'Off: OOUBL£ FINS Pa rIERN £QP B- C%W£ S L"Ws Ar "S aPw �L���P�_ —.._ (IYPIL'AL) e��i�T��� PAVEMENT MARKINGS PIERCE COUNTY STD. DETAIL PC.H2.2 NOT TO SCALE (NOT TO SCALE) EXPIRES. SEPT. S, 1999 Z Z FF g Q WjNY4 IgoI Z -paQ n N Q 3 W I a w W a Z 0 N M,� VJ n m i 0 0 I X I— Q U. � 0 am 0 �8V QZ Z Q 0 0 QrWN J rwlu W �Z �[ N M IL J 95-100 PROJECT NO. LEL DRAWN BY 11-24-97 ISSUE DATE 2-02-98 SHEET REVISION to 0) m r I M 0 0) m n I a 0 ! z 0 x Q. 00 00 00 rn 3 J to 0 0 w !n N U) 00 0 M aw-a[Ftttmc .[uar nl Iwrlr THE HIM. � REFCECAK FACE rCLLOM NAe KLLOw TYPE }w RUL[CIKE FALL wwrF-rw< 90E pKY IIPf J HEM-rXRCCaK YELLOW r0' CCNGIM REVISIONS: REMSED ROAD A WIDTH (FIRST 300 FEET) 1-16-98 LEL REMSED PER COUNTY REDUNES 2-02-98 LEL a PACIFIC ENGINEERING �ESIGN INC. o CIVIL ENGINEERING AND PLANNING CONSULTANTS OVD1865 co W UD Q cc cc N co l O Q V) co •ee (V aV06d) E311=fOkid ONV NV1d ZFlOVNIVkid wools aNV aVOU 9L6L- L£4 :XVd OL6L- t£ti (90Z) 3NOHd 89196 VM '3111V3S 00£ ains '1SV3 XNVd 213AOONV 0£ l LflGfl-ESi 4' <flOZ) ' XVd flroofim 'V C -vAA 'a BNOHd bOO ET EIA '�f ZLL ZZZ a-N -aAv FiLZIl EZZL •VM 6'0.7 RCAMW AN AmbW>D aN* IWWV l .7dL eY(>d Cu aaw"CA) E NOISVVd H1flOS aN`d ISN d l 0 11 N r w a. a Q w .LL LL was R Y mommom i I LN e00 114 \ I r z n` f t-N SOY „2t J"M9 fig Lq N a}, MOM p v ix�j 177' mrorp; c6 I N V) ss8m ai M O< N N.•M..'os m Z Z Z \. s S'=3AV NVHJ VN i 0 OVOLs) J I 1 1 : r — — b I 0 J i O O Z O O W LJ rn 0 rc a Z I� F 00 N m rn o S M I t0 AC 0 W w I m I w o n U) w r rZ Z FAA Q Q FEM zm_ 6L W0 z0 z0 wZ z JZ momma U a. U z Z co c W at�l yu-yu it Il dill ,,` e Gtl �flbOlShVI'�kidANSOSV0 q[E/-14'b :XVJ 0L6L-t£i4 (90Z) ;3NOHd M96 VM 43111V3S 00£ 31U1S '1SV3 XNVd 83AOONV 0£L L9L9-cgtr (90Z) . XV� 9et0-E9V (OOZ) : ONOHd b001M 'VM 'OnAa-l136 "a'N 'aAW H-LZLL EZZZ "VM "Op �3c>wa d ANYJY700 ONV wl� il-LL 400a M MSVHd) E NOISIAIO H1f10S aNVIaN`d l �a �If" ( I 9 4 ,l it IN. 5gy p J_ p K v O V I A[f I W H LL Z O p Z m � < � S O O W M LC)J p I w w CV I p a o I� m x W 0 zN W0 z_U r� z Wz z J z > Q U aJ. U z z C W /_66i 50 db:1[ 10 Jdll inH 6np Ir e pH\OOOL56\rDHd\N505V:3 9L6L-L£b :XVd OL6L-L£b (90Z) :3NOHd 99L96 VM 431-LLV3S 00£ 311ns 41SV3 NNVd 83AOCINV O£L 0 IN (v ovoid) rt n"ll=iokid aNV NV1d �ROVNIVkiO YVkl018 cINV OVOlJ 0 N w J Q U ' m Ih / I '" � •�'L fit£ � N �I m IWIQ ILL (ROAD B) o $4 N0349'20•E_�_ ¢ _ 70._I- G VE, S.E. m L9L9-E4b (90Z) . XVd fl ca asVFla) b1`00"''=CreZ 3N "VM "OAM/0 £ NOSVo H1fOS t; 1 r 8 eas m N�o A I A O OQ. � 009� 1 o jjj _ r I p 8 N / F 3 009 —DiW or ILI Z $ z� mW /J Z1 i vok H u7 D Z m QI I j Mj W W J O 0 K 1 x o I� a Z W < � S O N W m w i IN/1 W rn U z co W a z It W w Z a Z IJAAJ U LL U a; w 04 1 Iw rn w W WE f W8 00 1661 99:Zb:L[ SO 0@0 UOW 6mp i9-e pb\nOOi56U'OHd\nas\:D (V dVOFJ) ri a-ll=:IOkid <3NV NV'7d �3OVNIVHO rveoL8 % I I ONV CWOH lJ tr) O o M /w V � H O � II o a O O N C\j p ~ ^ Li O Q < J Z 0 N o U aF Q 0. O = v rrLO^ O w U. 9IHzl 3 s yo.ezN _ wow OCd SL6L-t£b :XVd 016L-t£4 (90Z) :3NOHd 99196 VM '3-1llV3S 00£ Mins '1SV3 >18Vd H3AO0NV 0£t L9L9-ESb (9OZ): -VM "OJ ac)watd XVd 9401rO-cSv (9OZ) BNOHd V00 'VM 'iRnA 1 e -� N -�AV H1ZLL EZZZ ANVr 4c > <3r4v ;iJlr'1 m*i 4jOd M asVHa) £ NOISVVa H1flOS dNb'1E3>IV-1 0 II w CL Q J � Q U � V) w I Zt4N SOY �9t j�14£ O w N O � " < a w~ Z� <o + OW < (p N I N 3 i 00 21 �Ia O < \ r VIF J ook N I Z09 p � < \ / B89 �m *69 rd � 069 _ 009\ / I s Cy` H,£L YO.9ZN m (1 OVON) 9 Z 0 C) Z m ~ N o J I O I W I w J O w N I a)ir o n m _ Z N Q (� Fm ZN WZ ZU0 ZQ WZ JZ _Q Uam U z 10 z J w J MK AM 7 L66i iv:EO:LI l0 3a4 uaw 6mp a Ptl\OOOI56\f`Ofid\NSOS\ �