Loading...
HomeMy WebLinkAboutMatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX # PROJECT LEAD Est. COST REVIEW EST. STATUS DESCRIPTION DATE COMPL. DATE 3 Hangar Rows 9 & 10 Steve Burke /AMG/ $200,000 5/16/2012 8/31/2012 Steve Burke putting appropriate documents together to roof Bob Jones send out project for bid for summer completion. 7 Noise Complaints AMG 0 5/16/2012 NA No reports since last report 9 Airport Security AMG TBD 5/16/2012 TBD Each association has been contacted informing them of Update the airports desire to have the airport control access. 11 Airport Master Plan Coleman /AMG TBD 5/16/2012 Feb 2014 3/16/2012, Draft RFQ was prepared by AMG in Mid -Term Update preparation for advertisement. 12 Occupancy Rates AMG -0- 5/16/2012 NA • Row 9/10 38/40 (95 %) -1 • Row 2 Full (14) (100 %) no change • Row 8 4/6 (67 %) no Change • Rows 3 -7 52/85 (62 %) -3 • Storage Units 8/12 Full (67 %) -1 • Tie down 31/100 full (31 %) -2 13 General Airport Board Only TBD 5/16/2012 NA Event to showcase Auburn Airport, e.g. WWI —II Event aircraft. Static display /food /sale vendors/ flights. 14 Fuel Dispenser AMG $10,000 5/16/2012 TBD AMG contacted Dave Stocker of Epic Aviation and Replacement he is assisting in locating proper replacement dispenser 15 Aircraft Accident AMG TBD 5/16/2012 6/30/2012 18 pages of document created with guidance from Emergency Plan and FAA Advisory Circular. Recover Plan 16 Update Airport Chris Anderson /RM TBD 5/16/2012 7/31/2012 Time Line received from RM, Kickoff meeting held Storm water 4/11/2012 "SWWPP" Plan Last Revision Date: 3/18/2012 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX 18 West Side Trees AMG TBD 5/16/2012 8/31/2012 Trees on the west side of the airport in the wet land DESCRIPTION DATE DATE areas have grown to a height that penetrates the 2 Airport Rules and AMG 0 9/20/2010 Runway Safety Area. These need to be cut Regulations down/removed. Contacted a tree removal to give 10 Aircraft Wash Rack AMG TBD 3/31/2012 ideas and pricing. Grant fiends might be available 7 MIA Appraisal AMG 0 12/31/2010 from FAA or State for this project. Additional bid 1 Airport Storm Reid $50,000 4/20/2011 will be received by 4/30/2012. 1 / # PROJECT LEAD Est. COST REVIEW COMPL. STATUS DESCRIPTION DATE DATE 2 Airport Rules and AMG 0 9/20/2010 Completed Regulations 10 Aircraft Wash Rack AMG TBD 3/31/2012 Completed 7 MIA Appraisal AMG 0 12/31/2010 Completed 1 Airport Storm Reid $50,000 4/20/2011 Completed Water Design Middleton /AMG Update 4 Runway Lighting Steve $350,000 6/2/2011 Construction Completed. Replacement Burke /Reid Middleton /AMG 5 Storm Water Robert 0 4/8/2011 Project Completed Retention Ponds Lee /Storm Water /Coleman 6 Airport Hangar AMG 0 9/7/2011 Completed Inspection 8 Drainage Mitigation Tim Carlaw Recent observation — no change since last report. No standing water. Monitoring and will update as necessary 17 Repair of Storm AMG $25,000 11/11/2011 Completed Water Catch Basins Last Revision Date: 3/18/2012