Loading...
HomeMy WebLinkAbout4758• RESOLUTION NO. 4758 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE A HIGHWAYS AND LOCAL . PROGRAMS STATE FUNDING AGREEMENT BETWEEN .'THE CITY OF AUBURN (THE CITY) AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (THE STATE) RELATING TO PROJECT NO. C201A, M STREET SE UNDERPASS WHEREAS, the City desires to . improve the safety, capacity, and efficiency of the crossing of M Street. SE and the BNSF Stampede Pass Railway; and WHEREAS, lowering 'M Street SE below the tracks and constructing a railroad bridge over the tracks will improve the safety; capacity, and efficiency of M Street SE at the crossing; and WHEREAS, the City received a grant in the amount of $6,000,000 from the Freight Mobility Strategic Investment Board (FMSIB) to assist in the construction of the M Street SE Underpass; and WHEREAS, it is in the best interest of the City to use grant monies to finance capital improvements to the street system. WHEREAS, the Washington State Department of Transportation is a State agency responsible for the administration of FMSIB funds for transportation projects; and Resolution No. 4758 October 6, 2011 Page 1 WHEREAS, the Washington State Department of Transportation requires a Highways. and Local Programs State Funding Agreement to utilize these FMSIB funds. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: Section 1. The Mayor is hereby authorized to execute a Highways and Local Programs State Funding Agreement between the City and the State for the Construction Phase in the total amount of $6,000,000 in substantial conformity with the agreement attached hereto, marked as Exhibit "A" and incorporated herein by this reference. In addition, the Mayor is hereby authorized to execute any necessary supplemental agreements for all future phases of the project. Section 2. That the Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. That this Resolution shall take effect and be in full force upon passage and signatures hereon. Resolution' No. 4758 October 6, 2011 Page 2 • Dated and Signed this t�. ✓ay of de __// , 2011. ATTEST: Da Ile E: Daskam, City Clerk APPROVED AS TO FORM: Daniel B. - id, City Attorney Resolution No. 4758 October 6, 2011 Page 3 PETER B. LEWIS MAYOR Exhibit A ANIL Washington State Department of Transportation Highways and Local Programs State-Funding Agreement Work by Public Agencies Agency and Address City of Auburn 25 West Main Street Auburn, WA 98001 Agreement Number Maximum Amount Authorized $6,000,000.00 Location and Description of Work (See also Exhibit °A°) M Street SE between 3rd Street SE and 8th Street SE in Auburn, WA. Project includes lowering and widening M Street SE and raising the BNSF railroad tracks to create a grade separated crossing. Participating Percentage 0% Project Number This AGREEMENT is made and entered into this day of , between the STATE OF WASHINGTON, Department of Transportation, acting by, and through the Secretary of Transportation, hereinafter called the °STATE,° and the above named organization, hereinafter called the "AGENCY.° WHEREAS,, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: Type of Work Estimate of Fundin • (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. Asenc b. Other c. Other -_ d. State e. Total PE Cost Estimate a+b+c+d Right of Way f. A • enc • O her . h. Other -_ i. State '. Total R/W Cost Estimate f •+h+i Construction k. Contract 14,984,800.00 5,293,500.00 I. Other Consultant - Const. Eng. 1,800,000.00 635,900.00 m. Other n. Other o. A • en 190,000.00 60,600.00 •. State 10 000.00 10000.00 q. Total CN Cost Estimate (k+l+m+n -o+p) 16,984,800.00 6,000,000.00 r. Total Project Cost Estimate (e+j+q) 16,984,800.00 6,000,000.00 DOT Form 140 -087 EF Revised 9/00 General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as °Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract Is awarded, administer the contract, or If the project is of a size which the AGENCY Is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own forces. All work performed under this AGREEMENT shall comply with the applicable provisions of state law. II Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED ". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It Is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected In a final payment. The AGENCY agrees to submit a final bill to the STATE within forty-five (45) days after the AGENCY has completed work. The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three -year retention period. IV Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any worts using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and/or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only In the Superior Court for Thurston County. VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or If the Secretary determines that It is in the best interest of the STATE. VIII Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and/or final inspection shall be submitted to the Assistant Secretary for Highways & Local Programs containing the following information: Non - Capital Proiects 1. A description of the project or program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and/or other benefits to the public. Capital Projects 1. A final inspection Is required. IX Supplement This agreement may be modified or supplemented only in writing by both parties. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year last written below. AGENCY By: Title: Mayor Date: DOT Form 140 -087 EF Revised 9100 STATE By: Date: Assistant Secretary for Highways and Local Programs /M. � Washington State �I/ Department of Transportation Highways and Local Programs State Funding Agreement Work by Public Agencies • Agency and Address City of Auburn 25 West Main Street Auburn, WA 98001 Agreement Number . LA 76 Y Amount Authorized $6,000,000.00 Location and Description of Work (See also Exhibit "A ") M Street SE between 3rd Street SE and 8th Street SE in Auburn, WA. Project includes lowering and widening M Street SE and raising the BNSF railroad tracks to create a grade separated crossing. Participating Percentage 100% Project Number 111151 6'tif) 5 00q This AGREEMENT is made and entered into this the STATE OF WASHINGTON, Department of Transportation, acting by and through the Secretary of Transportation, hereinafter called the "STATE," and the above named organization, hereinafter called the "AGENCY." 2(,t day of Aid e/11/3 d-/- 2-40)/ , between WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: a Type of Work Estimate of Fundin (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. A•enc b. Other c. Other d. State , e. Total PE Cost Estimate a+b+c+d Right of Way f. A•enc . Other h. h. Other i. State ". Total RAN Cost Estimate f •afi+l Construction k. Contract 5,293,500.00 5,293,500.00 I. Other Consultant - Const. Eng. 635,900.00 635,900.00 m. Other Non- Participation 10,984,800.00 10,984,800.00 n. Other o. A•en 60,600.00 60,600.00 .. State 10 000.00 10,000.00 q. Total CN Cost Estimate (k+lain+nao+p) 16,984,800.00 10,984,800.00 6,000,000.00 r. Total Project Cost Estimate (e+j+q) 16,984,800.00 10,984,800.00 6,000,000.00 DOT Form 140 -087 EF Revised 9/00 General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as "Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract is awarded, administer the contract, or if the project is of a size which the AGENCY is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own forces. All work performed under this AGREEMENT shall comply with the applicable provisions of state law. II Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED ". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected in a final payment. The AGENCY agrees to submit a final bill to the STATE within forty -five (45) days after the AGENCY has completed work. The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three -year retention period. Iv Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any work using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and /or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only in the Superior Court for Thurston County. VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or if the Secretary determines that it is in the best interest of the STATE. VIII Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and /or final inspection shall be submitted to the Assistant Secretary for Highways & Local Programs containing the following information: Non - Capital Proiects 1. A description of the project or program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and /or other benefits to the public. Capital Projects 1. A final inspection is required. IX Supplement This agreement may be modified or supplemented only in writing by both parties. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year last written below. AGENCY By: Title: Mayor Date: CD A-0 (1 2-0I) DOT Form 140 -087 EF Revised 9/00 STATE By: Date: Assistant Secret ry for Highways and Local Programs p►nv ^ 1 ?011 AIM 7 Washington State Department of Transportation Paula J. Hammond, P.E. Secretary of Transportation December 9, 2011 Dennis Dowdy Public Works Director City of Auburn 25 West Main Street Auburn, Washington 98001 -4998 Transportation Building 310 Maple Park Avenue S.E. P.O. Box 47300 Olympia, WA 98504 -7300 360 -705 -7000 TTY: 1- 800 - 833 -6388 www.wsdot.wa.gov City of Auburn M St. SE Grade Separation FMSIB- 1093(004) Dear Mr. Dowdy: RECEIVED DEC 1 4 2611 Chy of AubuRN Public WORks Dcpaxrw& T The above project has received fund authorization, effective November 21, 2011, as follows: PHASE - Construction TOTAL $16,984,800 STATE SHARE $6,000,000 Enclosed for your information and file is a fully executed copy of Highways & Local Programs State Funding Agreement LA -7623 between the state and your agency. All costs exceeding those shown on this agreement are the sole responsibility of your agency. All future correspondence relating to the project is to be submitted to your Region Local Programs Engineer, Ed Conyers at (206)440 -4734. Sincerely, Stephanie Tax Manager, Program Management Highways & Local Programs Division ST:jg:ac Enclosures cc: Ed Conyers, Northwest Region Local Programs Engineer, MS NB82 -121 �Washington: State , ,-Departi ent cf Transportation Highways ;and Local Progi State Funding Agreeme Work by Public Agencies Maximum Amount At $6,000,000. Participating Percentage 0% Project Number Agreement Number Parti 10 Exhibit "A ") and 8th Street SE liwenng and BNSF railroad ossing. This AGREEMENT is made and entered into this day of , between the STATE OF WASHINGTON, Department of Transportation, acting by and through the Secretary of Transportation, hereinafter called the "STATE," and the above named organization, hereinafter called the "AGENCY." WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: Type of Work Estimate of Fundin • (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. A•enc b. Other c. Other • d. State e. Total PE Cost Estimate a+b+c+d Right of Way f. A•enc .. Other h. Other i. State - -- — ". Total R/W Cost Estimate f •+h+i — — Construction k. Contract 14,984,800.00 5,293,500.00 I. Other Consultant - Const. Eng. 1,800,000.00 635,900.00 m. Other n. Other o. A•enc 190,000.00 60,600.00 •. State 10 000.00 10,000.00 q. Total CN Cost Estimate (k+l+m+n+o+p) 16,984,800.00 6,000,000.00 r. Total Project Cost Estimate (e+j+q) 16,984,800.00 6,000,000.00 DOT Form 140 -087 EF Revised 9/00 General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as "Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract is awarded, administer the contract, or if the project is of a size which the AGENCY is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own forces. All work performed under this AGREEMENT shall comply with the applicable provisions of state law. II Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED ". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected in a final payment. The AGENCY agrees to submit a final bill to the STATE within forty-five (45) days after the AGENCY has completed work. The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three -year retention period. IV Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any work using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and /or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only in the Superior Court for Thurston County. VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or if the Secretary determines that it is in the best interest of the STATE. VIII Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and /or final inspection shall be submitted to the Assistant Secretary for Highways & Local Programs containing the following information: Non - Capital Proiects 1. A description of the project or program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and /or other benefits to the public. Capital Projects 1. A final inspection is required. IX Supplement This agreement may be modified or supplemented only in writing by both parties. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year last written below. AGENCY By: Title: Mayor Date: (- DOT Form 140 -087 EF Revised 9/00 STATE By: Date: Assistant Secretary for Highways and Local Programs Wi Washington State A Department of Transportation Local Agency Feral Aid Project Prospectus Federal Aid Pro'ect Number _- Date 10/6/2011 \ WSDOT \ \Use Only Federal Employer Tax ID Number 91- 6001228 Local Agency Pro'ect Number C201A Agency City of Auburn Federal Program Tile • 20.205 • 20.209 • Other Project Title M Street SE Grade Separation Start Latitude N47'18.1" Start Longitude W122'12.8" End Latitude N4718.3" End Longitude W122'12.8" Project Termini From 3rd Street SE To 8th Street SE From: To: Length of Project 1700' Award Type Local • Local Forces • State • Railroad Federal Agency • FHWA • Others City Number 0055 County Number 17 County Name King WSDOT Region Northwest Region Congressional District 9th Legislative Districts 31st and 47th Urban Area Number 29 TMA / MPO / RTPO PSRC fa ,.•.- -I Funds Nearest Hundred Dollar) Phase Start Date Month Year Phase Total Estimated Cost Nearest Hundred Dollar Local Agency Funding Nearest Hundred Dollar P.E. RJW Const. $16,984,800 $10,984,800 $6,000,000 12/2011 Total $16,984,800 $10,984,800 $6,000,000 Description of Existing Facility (Existing Design and Present Condition) Roadway Width 36' +/- Number of Lanes 2 The existing project facility is the at -grade crossing of M St SE, a two lane principal arterial, and BNSF's Stampede Pass Railway. This roadway is a segment within the M St Corridor that provides a principal north -south arterial connection between SR 167 and SR 164 (Auburn Way South), via Harvey Road and 15th Street NW. The crossing severely limits the M Street Corridor capacity and safety by constricting the corridor's 4 -lane roadway width into two -lanes and by causing significant traffic back -ups as long, slow moving train traverse the crossing. The crossing overtaxes the City's street system and blocks emergency vehicles, driveways, and neighboring streets. Descri • tion of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) The project will provide a grade separation at the existing at -grade crossing of M Street SE with the BNSF Stampede Pass rail line and widen the roadway through the crossing to meet the principal arterial standards identified in the City's Comprehensive Transportation Plan. The railroad tracks will be raised at the crossing location by roughly 4' and will require almost 1900' of railroad track re- construction. A new railroad bridge will be constructed and the roadway will be lowered roughly 20' below its existing grade to provide clearance between the new bridge and crossing vehicles. Approximately 2000' of roadway will be re- constructed, which includes sidestreets and alleys that will be rebuilt to match the lowered grade of M St SE. Local Agency Contact Person City of Auburn, Attn: Jacob Sweeting, PE Title Project Engineer Phone (253) 804 -5059 Mailing Address 25 W Main St City Auburn State WA Zip Code 98001 By ae/vw--; J Project Prospectus Approval Approving Authority Title City Engineer Date 0 l 7 DOT Form 140 -101 EF Revised 1/2007 Page 1 of 3 Agency City of Auburn Project Title M Street SE Grade Separation Date 10/6/2011 Type _ .. of,.Pro -..._,, .. _ posed ,Work Project Type (Check all that Apply) New Construction • Path / Trail • 3 -R ►_� Reconstruction _■ Pedestrian / Facilities • 2 -R ►_� Railroad • Parking • Other Bridge Roadway Width Varies Number of Lanes Varies Federal Functional Classification Geometric „Design Data Description Through Route Crossroad Federal Functional Classification • Principal Arterial /_� Urban Minor Arterial • Principal Arterial ❑ Urban • Collecttorerial • Major Collector ❑ Rural • Minor Collector • Access Street/Road • Major Collector ❑ Rural • Minor Collector • Access Street/Road Terrain ■o Flat • Roll • Mountain • Flat • Roll • Mountain Posted S•eed 35mph 100 Desk n S • eed 40mph Existin• ADT 17000 Desi • n Year ADT 28000 Desi • n Year 2030 Design Hourly Volume (DHV) 2800 Performance of Work Preliminary Engineering Will Be Performed By City of Auburn Others 90 % Agency 10 % Construction Will Be Performed By City of Auburn Contract 100 % Agency % Environmental Classification Final ❑ Preliminary ❑ Class I - Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class Ill - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 _.._._Interagency.Agreement _ ® Class II - Categorically Excluded (CE) ® Projects Requiring Documentation (Documented CE) Environmental Considerations During the design phase environmental work has been performed to assess the existing conditions, identify any adverse impacts, and propose mitigation measures. Supporting environmental documents that were analyzed includes: * Cultural resources due to the presence of homes greater than 50 years old, * Noise because the raising of the railway track, and * Social /relocations /environmental justice because of the potential property acquisitions and relocations. The proposed project will not result in any adverse impacts on natural resources (i.e., water bodies or wetlands) because there are none in the project area. Page 2 of 3 Agency City of Auburn Project Title M Street SE Grade Separation Date 10/6/2011 Right of _. ay . . 0 No Right of Way Required * All construction required by the contract can be accomplished within the existing right of way. ❑ Right of Way Required ❑ No Relocation ❑Relocation Required Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project All existing utilities within the project corrdior will require re- location.. Underground utilities requiring re- location include a 12" storm drain, King County Metro 18" sanitary sewer, Puget Sound Energy (PSE) 6" high pressure gas main, PSE 2" gas mains, 12" water line, and an 8" water line. Overhead utilities are mounted on shared poles along the east side of M St SE that will require re- location and include PSE high voltage transmission lines, PSE power distribution lines, Comcast cable tv and fiber optic lines, and Qwest telephone lines. Additional stormwater facilities will be constructed and will include a pump station to lift local project runoff from the new roadway sag, catch basins and storm laterals, and stormwater pond(s). FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes 0 No This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's, comprehensive plan for communi e' - • me Agency City o By Date Doi 17 y0 t I DOT Form 140 -101 EF Revised 1/2007 Page 3 of 3 Mayor /Chairperson