Loading...
HomeMy WebLinkAboutAuburn Drainage Plan Volume 2 TOC CITY OF AUBURN COMPREHENSIVE STORMWATER DRAINAGE PLAN VOLUME 2 - APPENDICES Prepared for City of Auburn Public Works Department, Auburn, Washington December 2009 THIS PAGE INTENTIONALLY LEFT BLANK. CITY OF AUBURN COMPREHENSIVE STORMWATER DRAINAGE PLAN VOLUME 2 - APPENDICES Prepared for City of Auburn Public Works Department, Auburn, Was hington December 2009 City of Auburn Contract Number AG-C-302 Brown and Caldwell Project Numbers 132802 and 13534 7 701 Pike Street, Suite 1200 Seattle, WA 98101 THIS PAGE INTENTIONALLY LEFT BLANK. Table of Contents COMPREHENSIVE STORMWATER DRAINAGE PLAN i Use of contents on this sheet is subject to the limitations specified at the end of this document. TABLE OF CONTENTS APPENDIX A: WESTERN WASHINGTON PHASE II MUNICIPAL STORMWATER PERMIT APPENDIX B: GREEN RIVER PUMP OPERATIONS PROCEDURES PLAN APPENDIX C: 2009 STORMWATER MANAGEMENT PLAN APPENDIX D: SYSTEM INVENTORY AND MODELING APPENDIX E: FLOW MONITORING PLAN APPENDIX F: ECONOMIC LIFE ANALYSIS APPENDIX G: PUMP STATION CONDITION ASSESSMENT APPENDIX H: PHASE II NPDES STORMWATER PERMIT COMPLIANCE WORK PLAN APPENDIX I: REVIEW OF OPERATION AND MAINTENANCE APPENDIX J: PLANNING-LEVEL COST ASSUMPTIONS THIS PAGE INTENTIONALLY LEFT BLANK. COMPREHENSIVE STORMWATER DRAINAGE PLAN A APPENDIX A: WESTERN WASHINGTON PHASE II MUNICIPAL STORMWATER PERMIT THIS PAGE INTENTIONALLY LEFT BLANK. COMPREHENSIVE STORMWATER DRAINAGE PLAN B APPENDIX B: GREEN RIVER PUMP OPERATIONS PROCEDURES PLAN THIS PAGE INTENTIONALLY LEFT BLANK. COMPREHENSIVE STORMWATER DRAINAGE PLAN C APPENDIX C: 2009 STORMWATER MANAGEMENT PLAN THIS PAGE INTENTIONALLY LEFT BLANK. COMPREHENSIVE STORMWATER DRAINAGE PLAN D APPENDIX D: SYSTEM INVENTORY AND MODELING THIS PAGE INTENTIONALLY LEFT BLANK. COMPREHENSIVE STORMWATER DRAINAGE PLAN E APPENDIX E: FLOW MONITORING PLAN THIS PAGE INTENTIONALLY LEFT BLANK. F APPENDIX F: ECONOMIC LIFE ANALYSIS THIS PAGE INTENTIONALLY LEFT BLANK. APPENDIX G: PUMP STATION CONDITION ASSESSMENT THIS PAGE INTENTIONALLY LEFT BLANK. H APPENDIX H: PHASE II NPDES STORMWATER PERMIT COMPLI ANCE WORK PLAN THIS PAGE INTENTIONALLY LEFT BLANK. I APPENDIX I: REVIEW OF OPERATION AND MAINTENANCE THIS PAGE INTENTIONALLY LEFT BLANK. J APPENDIX J: PLANNING-LEVEL COST ASSUMPTIONS THIS PAGE INTENTIONALLY LEFT BLANK.