HomeMy WebLinkAboutAuburn Drainage Plan Volume 2 TOC
CITY OF AUBURN COMPREHENSIVE
STORMWATER DRAINAGE PLAN
VOLUME 2 - APPENDICES
Prepared for
City of Auburn Public Works Department,
Auburn, Washington
December 2009
THIS PAGE INTENTIONALLY LEFT BLANK.
CITY OF AUBURN COMPREHENSIVE
STORMWATER DRAINAGE PLAN
VOLUME 2 - APPENDICES
Prepared for
City of Auburn Public Works Department, Auburn, Was hington
December 2009
City of Auburn Contract Number AG-C-302
Brown and Caldwell Project Numbers 132802 and 13534 7
701 Pike Street, Suite 1200
Seattle, WA 98101
THIS PAGE INTENTIONALLY LEFT BLANK.
Table of Contents COMPREHENSIVE STORMWATER DRAINAGE PLAN
i
Use of contents on this sheet is subject to the limitations specified at the end of this document.
TABLE OF CONTENTS
APPENDIX A: WESTERN WASHINGTON PHASE II MUNICIPAL STORMWATER PERMIT
APPENDIX B: GREEN RIVER PUMP OPERATIONS PROCEDURES PLAN
APPENDIX C: 2009 STORMWATER MANAGEMENT PLAN
APPENDIX D: SYSTEM INVENTORY AND MODELING
APPENDIX E: FLOW MONITORING PLAN
APPENDIX F: ECONOMIC LIFE ANALYSIS
APPENDIX G: PUMP STATION CONDITION ASSESSMENT
APPENDIX H: PHASE II NPDES STORMWATER PERMIT COMPLIANCE WORK PLAN
APPENDIX I: REVIEW OF OPERATION AND MAINTENANCE
APPENDIX J: PLANNING-LEVEL COST ASSUMPTIONS
THIS PAGE INTENTIONALLY LEFT BLANK.
COMPREHENSIVE STORMWATER DRAINAGE PLAN
A
APPENDIX A: WESTERN WASHINGTON PHASE II MUNICIPAL
STORMWATER PERMIT
THIS PAGE INTENTIONALLY LEFT BLANK.
COMPREHENSIVE STORMWATER DRAINAGE PLAN
B
APPENDIX B: GREEN RIVER PUMP OPERATIONS PROCEDURES
PLAN
THIS PAGE INTENTIONALLY LEFT BLANK.
COMPREHENSIVE STORMWATER DRAINAGE PLAN
C
APPENDIX C: 2009 STORMWATER MANAGEMENT PLAN
THIS PAGE INTENTIONALLY LEFT BLANK.
COMPREHENSIVE STORMWATER DRAINAGE PLAN
D
APPENDIX D: SYSTEM INVENTORY AND MODELING
THIS PAGE INTENTIONALLY LEFT BLANK.
COMPREHENSIVE STORMWATER DRAINAGE PLAN
E
APPENDIX E: FLOW MONITORING PLAN
THIS PAGE INTENTIONALLY LEFT BLANK.
F
APPENDIX F: ECONOMIC LIFE ANALYSIS
THIS PAGE INTENTIONALLY LEFT BLANK.
APPENDIX G: PUMP STATION CONDITION ASSESSMENT
THIS PAGE INTENTIONALLY LEFT BLANK.
H
APPENDIX H: PHASE II NPDES STORMWATER PERMIT COMPLI ANCE
WORK PLAN
THIS PAGE INTENTIONALLY LEFT BLANK.
I
APPENDIX I: REVIEW OF OPERATION AND MAINTENANCE
THIS PAGE INTENTIONALLY LEFT BLANK.
J
APPENDIX J: PLANNING-LEVEL COST ASSUMPTIONS
THIS PAGE INTENTIONALLY LEFT BLANK.