HomeMy WebLinkAbout4830RESOLUTION NO. 4830
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF AUBURN, WASHINGTON, AUTHORIZING
THE MAYOR AND CITY CLERK TO EXECUTE AN
INTERLOCAL AGREEMENT WITH KING COUNTY
FOR THE COMPLETION OF EMERGENCY FLOOD
PROTECTION MEASURES PROJECT
WHEREAS, in 2009, the United States Army Corps of Engineers
("Corps") announced that the Howard Hanson Dam, over which the Corps has
jurisdiction and operational responsibilities, had a diminished capacity due to
identified side wall seepage, and that the dam may have to release waters in
the coming months into the Green River that could cause flooding in the City;
and
WHEREAS, the Corps also purchased materials for flood protection
purposes that it made available to the County, the City and other local
jurisdictions, so long as the materials were used in accordance with the
recommendations provided by the Corps, and were returned to the Corps once
the threat posed by the diminished capacity of the Howard Hanson Dam had
been addressed; and
WHEREAS, in 2009, the City and King County each issued emergency
proclamations that declared that the threat of releases of additional waters from
the Howard Hanson Dam constituted an emergency; and
Resolution No. 4830
July 2, 2012
Page 1 of 4
WHEREAS, on October 15, 2009, the City and King County executed the
Initial Contract which authorized the City to undertake temporary emergency
flood protection measures, consistent with Corps specifications, on County and
Flood Control District property, and the County to pay the City up to
$1,019,200.00 as reimbursement for costs incurred by the City in undertaking
such emergency measures, and
WHEREAS, on September 16, 2011, the Corps announced that
significant repairs had been completed to the Howard Hanson Dam and that the
capacity of the Dam had been restored to its pre-damaged state; and
WHEREAS, on May 14, 2012, the Board of Supervisors of the District,
through adoption of FCD Resolution No. FCD2012-02, identified up to
$2,140,694.00 of funds to be used by the City for actual costs incurred in
removing materials previously installed by the City on the Green River levees
and in restoring and repairing the levees, provided that 75% of such funds
come from the District, and 25% of such amount ($535,174.00) be contributed
directly by the City or by the City from loans by the District to the City from the
District's Opportunity Fund, with 1% interest per annum to be charged to the
City on the unpaid balance; and
WHEREAS, the City and the County wish to set forth the terms and
conditions under which the County will reimburse the City for actual costs
Resolution No. 4830
July 2, 2012
Page 2 of 4
incurred in completing the temporary emergency flood protection measures
initiated in 2009 by removing the flood barrier materials from the levees and
disturbed areas and restoring and repairing the levees and disturbed areas to
their previous condition, up to the amount of $1,605,520.00, subject to a
matching contribution by the City of 25% of the $2,140,694.00 amount identified
by the District, or $535,174.00, to be paid from loans from the District
Opportunity Fund or from funds paid directly by the City, and under which the
City will undertake and complete such removal, restoration and repair
measures.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. The Mayor is hereby authorized to execute an interlocal
agreement with King County, in substantial conformity with the agreement
attached hereto, marked as Exhibit 1 and incorporated herein by this reference,
and to implement such other administrative procedures as may be necessary to
carry out the directives of this legislation.
Resolution No. 4830
July 2, 2012
Page 3 of 4
Section 2. That this Resolution shall take effect and be in full force
upon passage and signatures hereon.
Dated and Signed this � day of , 2012.
C U
l ��
PETER B. LEWIS
MAYOR
ATTEST:
6
Danielle E. Daskam,
City Clerk
Resolution No. 4830
July 2, 2012
Page 4 of 4
�
COOPERATIVE AGREEMENT FOR COMPLETION OF EMERGENCY FLOOD
PROTECTION MEASURES PRO]ECT
THIS COOPERATIVE AGREEMENT FOR COMPLETION OF EMERGENCY FLOOD
PROTECTION MEASURES PROJECT ('�Agreement") is entered into on the last date
signed below by and between the Parties, the CITY OF AUBURN, a Washington
municipal corporation (`�City"); and KING COUNTY, a political subdivision of the
State of Washington ("County"), (collectively referred to herein sometimes as the
"Parties") with reference to the following facts:
RECITALS
A. This Agreement is a contract setting the terms and conditions by which
the City will complete the temporary emergency flood protection measures project,
initially authorized by that certain Agreement for Flood Protection Services by and
between the City and the County, dated October 15, 2009, as amended ("Initial
Contract"), by removing the temporary flood protection barriers along the Green
River and restoring and repairing the levees and other areas containing flood
control measures to their previous condition, and by which the County will
reimburse the City for such work up to a specified amount and grant to the City
rights of access and license as required for the City to complete the work.
B. In 2009, the United States Army Corps of Engineers ("Corps")
announced that the Howard Hanson Dam, over which the Corps has jurisdiction and
operational responsibilities, had a diminished capacity due to identified side wall
seepage, and that the dam may have had to release waters in the coming months
into the Green River that could cause flooding in the City. The Corps also
purchased materials for flood protection purposes that it made available to the
County, the City and other local jurisdictions, so long as the materials were used in
accordance with the recommendations provided by the Corps, and were returned to
the Corps once the threat posed by the diminished capacity of the Howard Hanson
Dam had been addressed.
C. Following the announcement by the Corps, the King County Executive
issued an emergency proclamation declaring that the threat of releases of
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 1 of 10
additional waters from the Howard Hanson Dam constituted an emergency, waived
county procurement requirements for contracts related to the county's response to
the emergency, and postponed County permitting procedures for public works.
D. The Mayor and City Council of the City of Auburn also issued an
emergency proclamation that declared that the state of emergency conditions
declared by the County were approved, confirmed and adopted by the City Council,
and that provided that during the existence of the emergency, the Mayor of the City
was authorized to implement administrative procedures deemed necessary to
prepare for, respond to, stabilize and control the emergency, consistent with state
law and local regulations.
E. The King County Flood Control Zone District, a quasi municipal
corporation and taxing district under the constitution of the State of Washington,
whose purpose is to sponsor and implement flood control and protection measures
(°District"), by resolution authorized $1,019,200.00 in funding to assist the City in
undertaking temporary emergency flood protection measures and authorized the
County, as Service Provider to the District, to enter into a contract with the City to
provide this funding for the City to implement identified emergency flood protection
measures.
F. The City and the County on October 15, 2009, executed the Initial
Contract, which authorized the City to undertake temporary emergency flood
protection measures, consistent with Corps specifications, on County and District
property, and the County to pay the City up to $1,019,200.00 as reimbursement for
costs incurred by the City in undertaking such emergency measures. The Initial
Contract also provided that upon a determination by the Corps that the Howard
Hanson Dam had been restored to its design capacity, the City was to be
responsible for removal of the flood protection materials, and restoration of the
levees to their previous condition. The City was to pay the costs for such removal
and restoration unless the County determined that funds were available to pay for
some or all of such costs.
G. On September 16, 2011, the Corps announced that significant repairs
had been completed to the Howard Hanson Dam and that the capacity of the Dam
had been restored to its pre-damaged state.
H. On May 14, 2012, the Board of Supervisors of the District, through
adoption of FCD Resolution No. FCD2012-02, identified up to $2,140,694.00 of
funds to be used by the City for actual costs incurred in removing materials
previously installed by the City on the Green River levees and in restoring and
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 2 of 10
repairing the levees, provided that 75% of such funds come from the District, and
25% of such amount ($535,174.00) be contributed directly by the City or by the
City from loans by the District to the City from the District's Opportunity Fund, with
1% per annum to be charged to the City on the unpaid balance. In the event the
loan mechanism is utilized, the City and the County shall enter into a separate loan
agreement.
I. The County, as the Service Provider to the District under the terms of
that certain Interlocal Agreement Between King County and the King County Flood
Control Zone District Regarding Flood Protection Services, as amended, and
pursuant to FCD Resolution No. FCD2012-02, is authorized to enter into this
Agreement to utilize funds from the District and to agree to the terms under which
the Work, as hereinafter defined, is to be completed.
J. The City and the County wish to set forth the terms and conditions
under which the County will reimburse the City for actual costs incurred in
completing the temporary emergency flood protection measures initiated in 2009
by removing the flood barrier materials from the levees and disturbed areas and
restoring and repairing the levees and disturbed areas to their previous condition,
up to the amount of $1,605,520.00, subject to a matching contribution by the City
of 25% of the $2,140,694.00 amount identified by the District, or $535,174.00, to
be paid from loans from the District Opportunity Fund or from funds paid directly by
the City, and under which the City will undertake and complete such removal,
restoration and repair measures.
NOW, THEREFORE, in consideration of the mutual promises, benefits and
covenants contained herein, the Parties agree as follows:
AGREEMENT
1. All recitals are hereby ratified as part of this Agreement.
2. The City shall complete the work ("Work"), which is hereby defined to
include:
a. Removal of temporary emergency flood protection material that
was added to the Green River levee system, along the Green River and along Mill
Creek, as shown and described on Exhibit A. by or on behalf of the City pursuant to
the Initial Contract. The City shall provide notice to the County at least 10 days
before such removal is to begin, and the County shall have the right to have
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PRO]ECT
June 20, 2012
Page 3 of 10
�
personnel present, at the County's sole expense, during such removal for the
purposes of monitoring the activities associated with the removal.
b. Provision of notice to the Corps and the County of the removal
of such materials and coordination with the Corps on the return to the Corps of any
materials and containers originally provided or funded by the Corps that the Corps
determines should be returned. The Corps shall have full discretion in terms of
what materials it wishes to have returned, and those that it does not. If the Corps
determines that specified materials originally provided or funded by the Corps
should not be returned, then the City in its discretion may keep such materials or
dispose of them as provided in 2.c. below.
c. Disposal of all materials determined to be waste, after
consultation with the Corps. Such disposal, management and transport shall be in
accordance with all applicable local, state, and federal directives, laws, and
regulations.
d. Restoration and repair of all areas where temporary emergency
flood protection materials were placed, or were impacted by such placement, to the
condition previous to the placement of the materials. The City shall provide notice
of and coordinate such restoration activities with the County agencies having
custodial responsibilities for such areas, if applicable. The restoration and repair
shall be deemed complete when the County issues its notice of Final Acceptance, as
described in No. 15 below.
3. Any contracts that the City intends to enter into for performance of the
Work shall be provided to the County at least ten (10) days prior to the date the
City intends to place the contract out for bid. The County shall have the right to
provide comments on such contracts and shall provide those comments to the City
no later than five (5) working days after the date the documents are provided to
the County by email, which the City shall take into account in good faith before
placing the contract out to bid. Such contracts shall be in compliance with all state
and federal laws and regulations governing the procurement of services as
applicable to a local government.
4. Any change orders or combination of change orders to the contracts
entered into by the City for the performance of the Work that exceed $100,000
shall be provided to the County, at least five (5) days prior to the intended date of
execution, for County review return and comment, which comments shall be
returned to the City within three (3) working days after the County receives copies
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
lune 20, 2012
Page 4 of 10
�
of the documents by email. The City shall take into account in good faith the
comments received from the County before executing the change order.
5. The City agrees to maintain documentation of all Work performed
sufficient to meet state and if applicable, federal, audit standards for the
implementation of a capital project. The City agrees to maintain additional
documentation that is reasonably requested by the County in order for the County
to accurately track expenditures and use of funds. City contract and internal
documents will be made available to the County for review and/or independent
audit upon request for six (6) years after completion of the work.
6. Reimbursement.
a. Subject to the provisions of No. 6.b and No. 7 below, the County
will reimburse the City for the actual costs incurred for the performance of the Work
within sixty (60) days of submittal of the invoices to the County, up to an amount
not to exceed $1,605,520.00, unless the Parties agree to extend that time to
resolve disputes.
b. For payment of any given invoice, the County shall pay 75% of
the invoice amount with funds from the District and 25% with loan funds from the
District's Opportunity Fund, if such loans are requested by the City, or if no loan is
requested, the City shall pay its 25% share of the invoiced amount. Any costs in
excess of $2,140,694.00 required to accomplish the Work shall be paid by the City.
7. Until the County issues its Notice of Final Acceptance, as described in
No. 15 below, the County shall retain 10% of the total costs of the Work. Upon
issuance of the Notice of Final Acceptance, the County shall pay the retained
amount to the City.
8. The County, to the extent that its property interests and those of the
District allow, hereby grants the City the right of access to the levees and other
areas containing temporary flood control measures, and license and permission for
special use to perform the Work upon the levees and other areas containing
temporary flood control measures as are identified in Exhibit A, attached hereto and
incorporated herein by this reference (collectively referred to herein as "Levees").
9. The City shall be responsible for complying with all applicable laws,
and obtaining all required permits in connection with the Work.
10. This Agreement and any activities authorized hereunder shall not be
construed as granting any rights or privileges to any third person or entity, or as a
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PRO]ECT
June 20, 2012
Page 5 of 10
R
guarantee or warranty of protection from flooding or flood damage to any person,
entity or property, and nothing contained herein shall be construed as waiving any
immunity to liability by the City, the County and/or the District, granted under state
statute, including Chapters 86.12 and 86.15 of the Revised Code of Washington, or
as otherwise granted or provided for by law.
11. The City acknowledges and agrees that it will not allow any lien or
encumbrance to be placed upon the real property interests and any other interests
held by King County and/or the District in connection with the Work. If any lien or
encumbrance is so placed, King County and/or the District shall have the right to
remove such lien and charge back the costs of such removal to the City.
12. The City authorizes, but does not require, the County, its employees,
contractors, agents and volunteers to visually inspect and monitor the condition and
performance of the Work at all times during the duration of this agreement at the
County's sole expense.
13. The City, its officers, employees, agents, contractors, invitees and
volunteers acknowledge that the County and the District have made no
representations as to the current condition of the Levees. The City agrees to hold
harmless and indemnify the County and/or District for any negligent act or omission
of the City, its officers, employees, agents, contractors, invitees and volunteers, to
the extent not within any immunity conferred by law on the County and/or the
District arising out of the Work performed on the Levees pursuant to this
Agreement. Such indemnification shall extend to any claims, including all demands,
suits and judgments, for damages arising out of injury to persons or damage to
property, where such injury or damage is caused by, arises out of the City's
negligence. The City shall by contract terms require its contractors to pass through
indemnification to the District and County to the extent of their respective property
interests.
The Parties recognize that the Work is intended to restore the Levees and
other locations containing temporary flood control measures to the condition that
previously existed before damage occurred to the Howard Hanson Dam. With the
Dam restored to its previous functioning capacity, there still remains no guarantee
that flooding will not occur. In the event that flooding does occur, the City, County
and the District shall continue to enjoy the immunity for flood prevention measures
conferred by law, and it is the intention of the Parties that the City, as contractor to
the County, shall likewise be included within such immunity to the extent allowed
by law, and to the extent not covered by the City's own immunity or its reasonable
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 6 of 10
exercise of its police powers. Nothing in this No. 13 shall be construed to eliminate,
reduce, or otherwise abrogate any immunity conferred on the City, County and/or
District in connection with acts or omissions arising out of the Work.
The indemnification provided for in this No. 13 shall survive termination of
this Agreement.
14. This Agreement shall remain in force and efFect until the Work is
completed and the County has issued a Notice of Final Acceptance, as defined and
described in No. 15 below.
15. Unless the parties agree in writing to extend any of the deadlines in
this section 15, the City shall complete that portion of the Work described in Nos.
2.a. and 2.b. and indicated in Exhibit A for the temporary measures installed on
existing levees by November 1, 2012 and for the temporary measures not on
existing levees by December 31, 2012. The City shall complete that portion of the
Work described in Nos. 2.c. and 2.d. by July 1, 2013. When the City determines
that it has completed all elements of the Work, it shall provide written notice to
County. Within 30 days of receipt of this notice, the County shall inspect the
completed Work and notify the City of any deficiencies. The City will have 30 days
to cure such deficiencies. Upon completion of the deficiencies to the satisfaction of
the County, the County shall issue a notice of final acceptance (��Notice of Final
Acceptance") to the City. In the event that the Parties do not agree regarding the
existence of or cure of any deficiencies identified by the County, the dispute
resolution provisions in No. 18 shall apply.
16. Solely for the purpose of enforcing the indemnification provision in
Section 13 above, each Party expressly waives, with respect to the other Party
only, any immunity that would otherwise be available against such claims under
the Industrial Insurance provisions of Title 51 of the Revised Code of Washington;
provided that, such waiver shall not preclude any indemnifying Party from raising
such immunity as a defense against any claim brought against the indemnifying
party by any of its employees.
17. Each Party recognizes that the other is self-insured and accepts such
coverage for liability arising under this Agreement. Should any Party choose not to
self-insure, that Party shall maintain and keep in full force and effect a policy of
general liability insurance in an amount not less than One Million Dollars
($1,000,000) per occurrence with an additional excess liability policy of not less
than Ten Million Dollars ($10,000,000) and will provide the other Party with a
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 7 of 10
certificate of insurance and additional insured endorsement that will name the other
Party as an additional insured.
18. The Parties will seek to resolve any disputes under the Agreement as
follows:
a. For disputes involving cost reimbursements, submittal of all
relevant information to an independent Certified Public Accountant and/or a
Construction Claims Consultant, if agreed upon by the Parties, for a non-binding
opinion as to the responsibility.
b. For disputes not involving cost reimbursements, these disputes
shall be referred for informal resolution to the Public Works Director of the City, or
the Director's designee, and the Director of the Water and Land Resources Division
of the County, or the Director's designee.
c. If the foregoing processes in 18.a. and 18.b. do not result in
resolution, the Parties may mutually select any informal means of resolution and
resort will otherwise be had to the Superior Court for King County, Washington.
d. Each Party will be responsible for its own costs and attorney's
fees in connection with the dispute resolution provisions of this Section 18.
19. This Agreement represents a full recitation of the rights and
responsibilities of the parties and may be modified only in writing and upon the
consent of both Parties.
20. The rights and licenses contained in this Agreement shall inure to the
benefit of and are binding upon the Parties, and their respective successors in
interest and assigns.
21. All communications regarding this Agreement shall be sent to the
parties at the addresses listed below unless a party gives notice of a change of
address. Notices may be sent by electronic mail. Any written notice hereunder shall
become effective three (3) business days after the date of mailing by registered or
certified mail, or the next calendar day after transmission by electronic mail, and
shall be deemed sufficiently given if sent to the address stated below or such other
addresses as may be hereinafter specified in writing.
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PRO]ECT
lune 20, 2012
Page 8 of 10
If to City:
Dennis Dowdy, Director
City of Auburn
Public Works Department
25 West Main Street
Auburn, WA 98001
ddowdy@auburnwa.gov
With a copy to:
Steve Gross, Assistant City Attorney
sgross@auburnwa.gov
If to District and/or County:
Mark Isaacson, Director
Water and Land Resources Division of
the King County DNRP
201 South Jackson St, Ste.600
Seattle, WA 98104-3855
Mark.Isaacson@kingcounty.gov
W ith a copy to :
Tom Bean, Senior Engineer
Tom. Bean@kingcounty.gov
22. The undersigned warrant that they have the authority duly granted by
their respective legislative bodies to make and execute this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement, which
shall become effective on the last date signed below.
CITY OF AUBURN
_ �
By:
Peter B. Lewi
Its: Mayor
DATE: .1UL 2 2012
KING COUNTY
By:
Christi rue, C
Depa ent of
and Parks
:ctor
atural Resources
DATE : J t�� � I, Z� v
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 9 of 10
APPROVED AS TO FORM: APPROVED AS TO FORM:
By: By: �
Attorne or City Auburn Ki County Deputy Prosecuting
� Attorney
ATTEST:
By: �-��� �
City Clerk for City of Auburn
COOPERATIVE AGREEMENT FOR COMPLETION OF
EMERGENCY FLOOD PROTECTION MEASURES PROJECT
June 20, 2012
Page 10 of 10