HomeMy WebLinkAbout4832 RESOLUTION NO. 4 8.3 2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AMENDING THE 2012-2017 SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY
OF AUBURN PURSUANT TO RCW CHAPTER 35.77
WHEREAS, the City of Auburn was provided notification by the Puget
Sound Regional Council and the Washington State Department of
Transportation about three grant awards totaling $3,913, 808; and
WHEREAS, as part of the award, the City is required to add the projects
to the 2012-2017 Transportation Improvement Program (TIP) and the
Washington State Transportation Improvement Program (STIP) in order to be
eligible to obligate the awarded funds; and
WHEREAS, pursuant to RCW 35.77.010, a public hearing to consider
amending the 2012-2017 Transportation Improvement Program for the City of
Auburn was held on August 20, 2012 at the hour of 7:30 p.m. in the Council
Chambers of the Auburn City Hall, pursuant to notice published in the legal
newspaper of the City of Auburn on August 9, 2012; and
WHEREAS, said amendment to the 2012-2017 Transportation
Improvement Program of the City of Auburn was approved by the City Council
by motion duly made and carried in said hearing.
Resolution No.4832
June 2e, 2612
Page 1
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1 There is attached hereto and denominated as Exhibit "A" and
the terms of which are incorporated herewith by reference as though fully set
forth, a designation of the streets within the corporate limits of the City of
Auburn to be improved in the manner therein set forth during the year set for
the improvement of such street or streets.
Section 2. That the City Engineer of the City of Auburn is hereby
directed to forward a certified copy of this Resolution to the Washington State
Department of Transportation for filing not more than thirty (30) days after the
adoption of this Resolution.
Section 3. That the Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of
this legislation.
Section 4. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
DATED this�0�tLday of August, 2012
CITY F
PETER B. LEWIS
MAYOR
Resolution No. 4832
June 281h, 2012
Page 2
ATTEST
Da ielle E. Daskam,
City Clerk
APP 4FOR,
Daniel B. iieid,
City Attorney
Resolution No.4832
June 2e, 2012
Page 3
ARTERIAL STREET FUND(1021 Capital Facilities Plan
Six Year Capital Facilities Plan,2012.2017 _ Special Revenue Fund
Project Title: South 272nd 277th St Corridor Capacity 3 Non Motorized Trail
Improvements TIP# 6
Project No: c222a0
Project Type: Capacity
Project Manager TBD LOS Corridor ID#15
Description:
The South 272nd277th Street Corridor Capacity&Non-Moborized Trail protect consists of the design,environmental permitting,
right of way acquisitionldedication,and construction of intersection improvements and major roadway widening on S 277th St
from Auburn Way North to L Street NE.The project components include adding two new eastbound through lanes,one new
west bound through lane,a Class I separated non motorized trail,street lighting improvements,stone drainage improvements,
streetsaaping improvements,Intelligent Transportation System improvements,intersection capacity and safety improvements,
and auxiliary turn lanes at Auburn Way North,D Street NE,and 1 Street NE.Project length is approximately 3,300 feet
Progress Summary:
Robertson Properties Group la participating in this project and is dedicating all necessary roadway frontage to the City.FHWA
Grant was secured In 2012 for Design and ROW phases.Construction grant funding application will be submitted in 2012.
Future Impact on Operating Budget:
The annual maintenance costa for this project is estimated to be$27,250.
Budget: - _ - — - -2011 -- YTD Actual 2012 11 Budget
Budget Expenditures Budget Balance
Adopted Budget
BudgetAmendmems
Ad)ustad Budget
Activity:
(prerleve Yee) 2011 YE 2017 Year
_tTotal Total Coat
Funding Sources: Prioito 2011 Estuiiata 2012 Bud 2073 BW H pro Total Coat
UmesWatao S9set Revenue 1 1 7 110, 278.355
Counts(Fed.Slate.Loce) - 850,400 41.900.000
TraMCNrpeGFeas - 290,700
other(Devebpm rit Funds)' - 2.300,000
Dew
Total Funding Seances: 19,08E 700,000 1,007,000 119.055 7,769,095
CapIW Expenditures:
Destgn 79,085 102,700 1,007,000 121,785 1,281,705
Aght orway 1.320.000
Gonshucbm s 170 000
ol
To Etpinditures: 19.086- -- - 103,700 1,007,000 121,705 7,771,786
Forecasted Project Cost - - _ _
Total Expenditures
2074 2015 2016 2017 20123017 Be rind 2017
Funding Sources:
UmeaNcted Sheet Rewnus 2.700 259.300
Gent(Fad,Sf8te,1.oCe1) 170,300 3.879,300 4,900,000
Traffic lmpect Fees 290.700 290,700
Othw(DswlopmentFunds)' 1,300,000 1,000,000 2,300,000
Other
Total Funding Sources: 1,473,000 5,170,000 7,7 ,000
Coplud Expenditures:
Design 153,000 1,262,700
MgN&My 1,320,000 1,320,000
Conatrucfbn 5170 000 5170 000
Total Expenditures: 1,473,000 5,170,000 7,762,700
Grants/Other Sources:
ARTERIAL STREET FUND(102) Capital Facidtles Plan
SIa.Yw Capital FadBeas Plan,2012-2017 Special Revenue Fund
Project Tide: Auburn Way South ISM 64)Corridor Safety Improvements TIP# 43
Project No: cpxxxx
Project Type: Capacity
Protect Manager. TBD LOS Corridor IN 4
Description:
This proJerd wlA Imprbve adsees iianegement,provide udums,upgrade tramp stops and street lighting,waen to axomodels turn lanes
and pedestrians and bkydes,upgrade"Pavement markings,Instep Pedestrian signals end audible pedestrian push buttons,and upgrade
bash signals to change the phasing and to improve the visibility of the signal heads.
Progress Summary: --- — -
Grant funding was awarded in 2012 and does not require a local match.
FuWre Impact on Operating Budget:
This protect wle have no impact tot the operating budget for areas maintenance.
Budget: 2011 YTD Aeluel 2012 it Budget
Budget etpmalum Bud" Bahmos
Adopted Budget
Budget Amendm"As
Adjusted Budget
Aedvltyi_
(PMVIous Yn) 2011 YE 2012 Year Brig TOW Project
Funding Sources: prior to 2011 Eesmaa 2012 Budget 2013 Budget Project Total teed
Unreablcted S0esl Revenue
Gnuta(Fed Srate,LoCaQ 250,000 2,333,108
Trask nnpal Fees
PN7FL
Omer
Toll Funding Sources: 250,000 2,333,108
Capad F.xPendkunr.
Ossign 250,000 312,210
RION of WAY 89,585
COnshudda 1,01,313
Total Expenditures: 250,000 - 2,533,106
Forecasted Project Cost
Toad EaPWWItU a
2014 _ 20'Is _ 2016 2017 20122017 Beyond 2017
Funding Sowees:
Umeabkted Street Revenue
Granl(FedState.LOW 2,083,108 2,333,106
Taac Imped Fees
PWTFL
Omer
Told Funding Bavrtes: 2,00.1,10 2,333.108 -
Capita EXP-Alb o:
Oewgn 82,210 312,210
Rightemy 69.565 69,585
Construction 1,951,313 1,951,313
Told Expenditures: 2,007,100 2,333.10
Grant/Other Sources:
ARTERIAL STREET PRESERVATION FUND(105) Capital Facintlea Plan
Six Year Capital Facilities Plan,2012-2017 Special Revenue Funds
Project Title: West Valley Highway System Preservation(15th NW to 37th NW)
Project No: cp)u= TIP#22
Project Type: Won-Capacity
Project Manager. Seth Wickstrom
Description: The West Valley Highway System Preservation project will overlay the falling portions of the street pavement
between 75th Street NW and 37th Street NW. This entails the Installation of a leveling course,providing a 2-3'thick asphalt
concrete overlay,and includes minor surface utility adjustments.
Progress Summary: --
FHWA STP Grant funding was secured in 2012.
Future Impact on Operating Budget
None
Budget: - 7011 YTD Actual 2012 11 Budget
Budget Expenditures Budget Balance
AooptedBudget
BudgetAmenalnents
Adjusted Budget -
Activity:
(Previous Yra) 2011 YE 2013 Year End Total Project
Funding3wroes: Prior to 2011 Estimate_ 2012 Budget- - 2013 Budget Project Total Coil
ArblOalPnaserveOon Fund - - - _ - 590,000 - 560,000
Gram Funning( AWI sow,1.00110 560,000 560,000
uunyT"
REET2
BoodFlloceeds
Total Funding sources: 1,120,000 1,120,000
Capita Ermnetitures:
Design - 111,060 - 134,000
Blight W Way -
Con 986,000 986,0011
Total Expenatures: 1,120,000 - 1,120,000
Forecasted Project Cost:
Total Expenditures
2014 2015 2016 2017 .2012.2017. Beyond 2017
Funding Sourus:
AnatlelProseradon Fund 550,000
Grant Fwrdi ig(Fodaral,State,LocaO SWAM
ujily Ta
REET2
BandPS6roeds
Total Funning sources: 1,120,OOD
Capital Esperaglurev
Design _ 134,00D
Not d way
G4nshm", 989.000
Total Expenditure: 1,120,000 _
Grants I 011ie sources: