HomeMy WebLinkAbout09-19-2012 MatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX 4 PROJECT LEAD Est. COST REVIEW EST. STATUS DESCRIPTION DATE COMPL. DATE 7 Noise Complaints AMG 0 10/17/2012 NA No complaints since last report 9 Airport Security AMG TBD 10/17/2012 09/30/12 ACHA spokesman Gene Vezzetti advised AMG that Update ACHA agrees to city access control of gate, ACHA is in process of collecting gate cards to hand over to AMG. ACF3 spokesman Mike Boats is obtaining keys and manuals for the gate to turn over control to the city. 11 Airport Master Plan Thomas /Century $225,000 10/17/2012 Feb 2014 Bill Thomas reports the cost was $26K over the grant Mid -Term Update West/AMG application, scope was reduced by $32K, MPl1 is now proceeding with Contract Execution and Notice to Proceed. 12 As of 8/9/12 AMG -0- 10/17/2012 NA • Row 9/10 40/40(100%) no change Occupancy Rates • Row 2 (14) (100 %) no change • Row 8 2/6 (33 %) no change • Rows 3 -7 52/85 (61 %) -2 • Storage Units 8/12 (75 %) no change • Tie doN -,n 35/70 (52 %) -1 13 General Airport Event Board Oniv TBD 10/17/2012 NA Tenant Meet & Greet BBQ Nvas on 9/8/12. About 45 tenants shoNved up. 15 Aircraft Accident and AMG TBD 10/17/2012 9/30/2012 39 pages of document created N ith guidance from FAA Emergency Plan Advisory Circular. Recover Plan 16 Update Airport Storm Chris Anderson/RM $38,000 10/17/2012 10/31/2012 RM submitted draft of SWPPP. AMG revieNved and Nvater "SWWPP" Plan requested changes on 8/27/12. City submitted their comments on 9/12/12. RM requested a combined meeting Nvith AMG and Chris Anderson. 18 West Side Trees AMG $25,000 10/17/2012 TBD WSDOT performed the obstruction survey and the airport has some FAR Part 77 penetrations. Carter Timmermann will be on site to discuss options the week of 9/17/12. 19 506 Building Update AMG TBD 10/17/2012 Building has been vacated by NAC. Wings Aloft presented marked up plans for tenant improvements, Wings has been requested to submit a formal proposal to Last Revision Date:9/17/12 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX COMPLETED 4 PROJECT LEAD Est. COST REVIEW COMPL. Shelley. 21 Wildlife Hazard Assessment AMG $75,000- $100,000 01/15/2014 TBD Project on hold, aNvaiting grant funding (state & federal) COMPLETED 4 PROJECT LEAD Est. COST REVIEW COMPL. STATUS DESCRIPTION DATE DATE 3 Hangar RoNys 9 & Steve $250,000 09/19/2012 8/31/2012 Completed 2 days early, Final Cost $80,000 10 roof Burke /AMG/ Bob Jones 22 2131 Building AMG N/A 8/1/2012 Airtech is a Tenant as of 8/1/12. Update 14 Fuel Dispenser AMG $10,000 6/8/2012 Completed. Final cost Nyas $8,000. Replacement 2 Airport Rules and AMG 0 9/20/2010 Completed Regulations 10 Aircraft Wash Rack AMG TBD 3/31/2012 Completed 7 MAI Appraisal AMG 0 12/31/2010 Completed 1 Airport Storm Water Reid $50,000 4/20/2011 Completed Design Update Middleton/AMG 4 RunNyaN- Lighting Steve $350,000 6/2/2011 Construction Completed. Replacement Burke/Reid Middleton/AMG 5 Storm Water Robert 0 4/8/2011 Project Completed Retention Ponds Lee /Storm Water /Coleman 6 Airport Hangar AMG 0 9/7/2011 Completed Inspection 8 Drainage Mitigation Tim CarlaNy Recent observation — no change since last report. No standing Nyater. Monitoring and Nyill update as necessary 17 Repair of Storm AMG $25,000 11/11/2011 Completed Water Catch Basins Last Revision Date:9/17/12