HomeMy WebLinkAbout4852 RESOLUTION NO. 4 8 5 2
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF AUBURN, WASHINGTON, AUTHORIZING
THE MAYOR AND CITY CLERK TO EXECUTE AN
CONSERVATION GRANT AGREEMENT BETWEEN
THE CITY OF AUBURN AND PUGET SOUND
ENERGY
WHEREAS, Puget Sound Energy offers grants for electricity and natural
gas conservation measures installed or implemented at facilities that receive
electric or natural gas service from Puget Sound Energy; and
WHEREAS, the City intends to install or implement conservation
measures and is requesting a grant from Puget Sound Energy; and
WHEREAS, the Conservation Grant would provide funding to assist with
the installation and implementation of the conservation measures.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
KING COUNTY, WASHINGTON, HEREBY RESOLVES as follows.
Section 1. The Mayor of the City of Auburn and the Auburn City Clerk
are hereby authorized to execute a Conservation Grant Agreement between the
City of Auburn and Puget Sound Energy which agreement shall be in
substantial conformity with the Agreement attached hereto as Exhibit "A" and
incorporated herein by this reference.
Section 2. The Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directives of
this legislation.
--------------------------------
Resolution No. 4852
August21, 2012
Page 1 of 2
Section 3. This resolution shall be in full force and effect upon
passage and signatures hereon.
Dated and Signed this 5 day of 2012.
CITY UBURN
1
PE R EWIS, MAYOR
ATTEST
"4" ea�
Danielle E. Daskam, City Clerk
APP V
ED S 0 FORM:
Daniel B. He d, City Attorn
---------------------------
Resolution No. 4852
August 21. 2012
Page 2 of 2
PUGET SOUND ENERGY
The Energy To Do Great Things
CONSERVATION GRANT
Agreement No. C 11689
Project No.087-5881
Conservation Schedule E250
This AGREEMENT is made this day of N�✓fir IC2- 20 , by and between
PUGET SOUND ENERGY and City of Auburn ("Participant").
RECITALS
A. Under Puget Sound Energy s Electric Schedule 83 and Gas Schedule 183,as currently in effect and on file with
the Washington Utilities and Transportation Commission,Puget Sound Energy offers grants for electricity and
natural gas conservation measures installed or implemented at facilities that receive electric or natural gas
service from Puget Sound Energy
B. Participant intends to install or implement conservation measures and is requesting a grant from Puget Sound
Energy under its filed Electric Schedule 83 and/or Gas Schedule 183 tariffs.
AGREEMENTS
Puget Sound Energy and Participant agree as follows:
I Premises. Participant will install or implement the conservation measures listed in paragraph 2("Conservation
Measures")at the facilities located at 340 E MAIN ST AUBURN,WA 98002-AUBURN JUSTICE CENTER
(the"Premises").Participant represents either(a)that it is the owner or contract purchaser or otherwise has the
lawful authority to make the statements herein on behalf of the owner or contract purchaser of the Premises,or(b)
that it is the lawful tenant of the Premises and that it has obtained written authorization from the owner or contract
purchaser of the Premises.
2. Conservation Measures.Participant represents that it will purchase equipment or materials or has entered into
an agreement or will enter into an agreement with a contractor or contractors(the"Contractor")for the
purchase and installation or implementation at the Premises of the Conservation Measures,which may be
detailed in Attachment D:Attachment to Conservation Grant,at the indicated costs,summarized below.
Total Cost of Eligible
Conservation Measure Conservation
Conservation
Measures Life
Measures Grant
1 t3VAC controls only 10 i $51,228 00 $35,860 00
TOTAL (includes sales tax) $51,228 00 $35,860 00
Participant represents that the total cost of the Conservation Measures,if identified above,is the full amount of
its obligation,after adjustment for any discounts,credits or non—PSE incentives offered.
3. Grant. Subject to Puget Sound Energy acceptance,Puget Sound Energy will grant the Participant,after
installation of the Conservation Measures,an amount equal to the Eligible Electric Schedule 83 and Gas
Schedule 183 Conservation Grant(the 'Grant") as identified above,provided,however,that such Conservation
Measures must be installed,and Grant paid within 24 months or less of the signing of this Conservation Grant
Agreement. If for any reason the cost of the Conservation Measures is actually less than shown above,Puget
Sound Energy may decrease prorata the amount of the Grant. Participant shall be responsible for paying any
amount in excess of the amount of the Grant.
4386 10/08 Agreement No C-I 1689 Page I of
PUGET SOUND ENERGY
The Energy To Do Great Things
CONSERVATION GRANT
4. Separate Contract.The purchase and installation of the Conservation Measures shall be pursuant to a separate
contract between Participant and Contractor Puget Sound Energy is not,and shall not be deemed to be,a party
to any purchase or installation contract. All obligations to any Contractor pursuant to any such contract shall be
Participant's responsibility Participant expressly acknowledges that Puget Sound Energy's involvement with
respect to the Conservation Measures,including but not limited to any energy analysis or inspection by Puget
Sound Energy of the Premises or the Conservation Measures,is solely undertaken in connection with
furnishing the Grant.
5. The types of materials,methods of installation,quality and timing thereof,and any warranties with respect
to the Conservation Measures or their installation at the Premises,are matters to be agreed upon solely
between Participant and any Contractor PUGET SOUND ENERGY HAS NOT MADE AND DOES
NOT MAKE(AND PARTICIPANT ACKNOWLEDGES THAT PUGET SOUND ENERGY DOES
NOT MAKE)ANY IMPLIED OR EXPRESS WARRANTY(INCLUDING BUT NOT LIMITED
TO ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS)
REPRESENTATION,OR PROMISE WITH RESPECT TO EITHER(A)THE CONSERVATION
MEASURES,(B)ANY MATERIALS AND LABOR REQUIRED FOR OR USED IN THE
INSTALLATION OF THE CONSERVATION MEASURES,OR(C)THE INSTALLATION OF
THE CONSERVATION MEASURES.
6. Release.Participant releases Puget Sound Energy from any and all claims,losses,harm,costs, liabilities,
damages and expenses directly or indirectly resulting from or in connection with(a)the Conservation
Measures,(b)any materials and labor required for or used in the installation of the Conservation Measures,(c)
the installation of the Conservation Measures,or(d)the identification,handling and disposal of any associated
hazardous waste materials.
7 Disclaimer Puget Sound Energy conducts energy analyses at the request of its customers to determine the
extent to which conservation measures are cost—effective.Any estimate of energy savings made by Puget
Sound Energy in connection with any such analyses is solely for the purpose of determining the cost—
effectiveness of the particular conservation measures and not to be used for any other purpose. Puget Sound
Energy has not and does not make any promise,warranty or representation with respect to any savings in
energy consumption from Conservation Measures.
8. Termination.In the event a Participant's contribution to Puget Sound Energy's(PSE)recovery of energy
efficiency program costs is affected by all or a portion of Participant's electric and/or gas delivery service being
provided by a party other than PSE,then Participant shall refund to PSE an amount equal to the ratio of the
unused Measure Life of the measure(s)to the total Measure Life of such Conservation Measure(s)multiplied
by the dollar amount of the Grant with respect to such Conservation Measure(s).
9 Incorporation of tariffs by reference.This Agreement and the Attachment To Conservation Grant are subject
to the terms of the filed Electric Schedules 83 and Gas Schedules 183 tariffs,which are incorporated herein by
this reference. Further,specific terms and conditions from one or more Conservation Schedules(including but
not limited to: Electric Schedules 217(Multi-Family Existing Structure);218(Multi-Family New
Construction);250(Commercial and Industrial Retrofit Program);251 (Commercial and Industrial New
Construction Efficiency);or 258(Large Power User Self Directed Program)and Gas Schedules 205
(Commercial/Industrial Retrofit Program);217(Multi-Family Existing Structures);218(Multi-Family New
Construction);or 251 (Commercial/Industrial New Construction Efficiency)may also apply Puget Sound
Energy will determine,at its sole discretion,which Conservation Schedule or Schedules apply This
determination will be based on,but not limited to metering type,construction type,building size,Puget Sound
Energy experience and other industry standards.The applicable Schedule or Schedules number or numbers
appear in the title of this Agreement above. A complete list of conservation Schedules is available at:
4386 10/08 Agreement No C-11689 Page 2 of 3
PUGET SOUND ENERGY
The Energy To Do Great Things
CONSERVATION GRANT
hrtp//use coin/abouti)se/Rates/Pages/Electric-Rate-scliedules.asos'Sciiedule x0020 Type=Conservation.
10. Entire Agreement.This Agreement sets forth the entire agreement between the parties and supersedes any and
all prior agreements with respect to the Conservation Measures.No change,amendment or modification of any
provision of this Agreement shall be valid unless set forth in writing and signed by both parties.
PUGET UND ERG PARTI PA T L/---
By By. n 7�
Name: David Landers Print Name: f Pi��°✓ O- ��W S
Title: Mgr.,Business Energy Management Title: kl R-y0
Federal Tax I.D No.
4386 10/08 Agreement No C-11689 Page 3 of 3
Z ea 1 391
.M.
podej aoueleq pue)sal q
lolejado 6uilopq o)papmwd ueoq seq bu!u!ei)walsAs Iwluoo alenbape legl uogeoylllao s lauMO E
uo!ss!wgns o)loud ioloeiluoo Aq paMainaJ aq g sgde)6 AJewwns apnlou! 'pazlue6lo aq pegs elep
puwl swnpaooid u01le0guan anoge ql!M pj000e ul 3Sd o) uoge)uawnoop uogeolluaA aP!Aad Z
3Sd Aq PBMBIAaJ 91!s-uo si lenueW walsAS aleudwdde se sabuego puaww000H 'sajnpeowd
uogeopuaA pue)sll s)u!od 'saouanbas laluoo 'slu!odlas 'salnpagos MalnaJ (legs 3Sd Pue lauMO L
:(yioods)ieglo FJ
'S6L£wiod lesodsid 91seM 6upg6ll 3Sd peleldwao
El
'(s)wnseaW uogemesuoo)o uo!lellelsui gum poleioosse Jogel pue'sleualew'luawdinbe
of paPwil lou lnq 6uwpnpu!'sasuadxa Ile Jol(salewgse jo'solonb'sJepJo osepind ou)6w310AU!to soldoo
(joloelluop 01 luawAed
luw6 subisse)wjod spund)o lU2wU61SSV Jo(,6-M uuod,)JagwnN uopeogquapl Je6edxel Jol lsanbay palaldwop
:luaw6ed lueio of Joud lued!olned Aq Paglwgns aq llegs 6u!mollol 9q1
spJepuels pue sepoo opeogdde]le pue speeu spedaped glim(s)wnseaW uogemesuoo
eql to eouelldwoo wnsuo of sluellnsuoo'svolowluw'sJeu6isep pwig sped!o!ped eql pue lued!olued luw6 aql
to Ail!Wsuodsw agl si 11'uoil oildde papuelui agl lol polooles luawdinbe to/q!pgelins egl Jo s]uedn000 A1!Inel Jo slallJom
to 6waq-pam Jo'polwoo'Aleles'gllesq sql buunsue lol alglsuodsaa lou si A6J9u3 punoS la6nd*pwego si luwo aql goigm
Jq(s)wnseaW uoi eomosuoo to slueuodwoo pelelw-0jaue 6uiupap to asodlnd oql jol Naps we suopeogneds enoge aql
Modal eoueleq pue)sal e apinwd llegs loloeiluo0 j
slwluw Mau to uopepe)sui o)uoud MainaJ 101 3Sd pue jauMo of saunpaoad uogeayuaA pue)sp s)wod
pue saouanbas laluoo qpm s6u!Meip's)wodlas pue salnpagos pasodwd apinad llegs loloeiluo0 '3
'6uwle.q slgl buunp aoualalw e se pasn aq pegs lenueW swolsAS aql slw)uoo
bulpinq aql to uogeuado ladad oql ul jolelado 6wppnq lol bu!u!el)ap!nad llegs loloeiluoO p
sloj)uoo to bu!uopounl bulAluaA col sainpeowd pue 'siwodlas 'salnpagos 6ullejado 'saouanbas laluoo
'sopewagos OVAH 6ulpnlou! jolelado 6wppnq lol lenueW swalsAS e ap!nad pegs)oloelluoO O
(sAepllog snld�aam/step D )uawd!nba OVAH pue sauoz uol slu!odlas pue salnpagoS 9
s)!un Ile jol 6ulz!wouooa ssalun posolo VSO g11M dolS/ue)S wnwgdo q
puewap auoz uo paseq lases)u!odlas ain)eladwal AlddnS E
spouad pa!dn000un pue pa!dn000 Jol slwodlas 6ugeaq pue 6ugooO Z
puewap len)oe au!wualap of sauoz Z to wnww!w e 6wsn ue j AlddnS uo lasaa anssad ope1S L
.Molaq pau!pno g L san)eal pue(03SM)apoO A6l9u3 alelS uol6ulgseM Aq paimbai asogl
apnloul pegs sainleal l0 )u00 slw)uoo 30Vf WfllORii gi!M slol3uoo OVAH 6ulpllnq bugs!xe eoeldej
'ZLOZ 19Z/£ uo polep suo!lnloS Appoej jalplN-pleuo( oeW Aq polllwgns lesodwd aql uo paseq q
uopwado L/4Z)uaiino aql uegl jaglej Aepu j g6nolg!AepuoW
Ad o0:7 of WV 00:9 wwl palnpogos aq of L-niN Molle of sabuego lclaw loags Ajessaoeu aP!Aad
'ZLOZ/9Z/E uo palep suopnloS Al!I!oej jai IIW-pleuopoeW Aq pall!wgns lesodwd aql uo paseq 'V
:ouimollol aql)o lslsooa Ilegs 1slanseayy uupeiuesoop
L999—LSO 'oNloafwd
Egg L L — p 'ON 1o9waw6V
1NVUE) N0I1VAH3SN03 011N3WHDV-U /
.5.1w Jaaag op 01 x6iau3 aY1
AoN3N3 owosBond
PUGET SOUND ENERGY
The Energy To Do Great Things
ATTACHMENT TO CONSERVATION GRANT
Conservation Measures shall be verified as follows pror to Grant payment
A PSE representative to confirm sheet metal modification that enabled RTU-1 to be scheduled from
8'00 AM to 4.00 PM Monday through Friday
B. Contractor shall verify proper Installation and operation of the controls to PSE and Owner following
the agreed verification procedures. Trend data, with agreed upon points and sampling rate, Is required
to check actual operation of control sequences Including control features 1-5 and those required by
WSEC After verification results are provided showing system is operating correctly PSE will do a site
visit and any verification test procedure may need to be repeated. Controls contractor must be present
to run through these tests.
C. Control sequences and verification procedures shall at least include the following
1 VAV Terminal Box Control
Zone Temperature and Airflow Sensors (calibration and setpoint)
Terminal Fan Control; Occupied & Unoccupied operation
2 AHU Control
Controlling sensors calibration (eg, Duct static pressure, SAT MAT OAT)
Morning Warm-Up and Optimum Start/Stop sequences
Supply Air Temperature reset& Duct Static Pressure reset
Economizer Control
- Minimum outside air control
3. Schedule(7 days/week, holidays)
Equipment Enable
Each Zone occupied and unoccupied times and setpoints
Zoning (boxes tied to correct zones)
4 Test and Balance Report
- Duct static pressure setpoints for energy efficiency
-Building static pressure& Minimum OA cfm
5 Verify proper operation of HVAC safety and life support functions as required by owner
If untended energy savings are not being achieved by Conservation Measures)because specified equipment efficiency parameters or
performance parameters define above are not used,Participant shall be required to correct such deficiencies prior to Grant payment
Failure to with specifie quipirlient efficiency or performance parameters orfeiture or reduction of Grant payment
LJ;tt::L� cI JT�
By By
Name. David Landers Print Name �e ��✓ �- ��'--`-��% S
Title Manager,Business Energy Management Title /1'1 y"Ji-
I (J/) y�l
Federal Tax I D No / — GSC(f2 2—"
7
By
Name
Title Grant No, C-11689
Project No. 087-5881
<365 Ml�
PAGE 2 O 2