Loading...
HomeMy WebLinkAbout12-19-2012 MatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX 4 PROJECT LEAD Est. Funds REVIEW EST. STATUS DESCRIPTION COST FAA/WSDOT /Airport Fund DATE COMPL. DATE 7 Noise Complaints AMG N/A N/A 01/16/2013 NA No complaints since last report 9 Airport Security AMG TBD N/A 01/16/2013 12/31/12 AMG prepared letter and has discussed Nvith Update President of ACHA changeover of access control of automated and personnel gate. AMG has acquired manuals and keys. AFC3 Gate under Citv control. 11 Airport Master Plan Thomas / $225,000 90 0/0/0 0/0/10% 01/16/2013 Feb 2014 Bill Thomas Nvill update board on progress Mid -Term Update Century West/AMG 12 As of 12/10/12 AMG N/A N/A 01/16/2013 NA • Metal Enclosed '18/40(95%) -1 Occupancy Rates • Roll -up Enclosed (14) (100 %) no change • Open Twin Hangar 2/6 (33 %) no change • Open T- Hangar 54/85 (64 %) no change • Storage Units 8/12 (75 %) no change • Outside Tie down 31/70 (44 %) -1 13 General Airport Board Onlv TBD 0 0/0/00/0/100% 01/16/2013 NA Event 15 Aircraft Accident AMG TBD N/A 01/16/2013 12/31/2012 First Draft completed, Draft under review by Josh and Emergency Plan Nvith the NTSB, Jeff Nvith Avtech, VRFA and Sara Recover Plan Miller at CofA emergency Mgmt for comment 16 Update Airport Chris $38,000 0 0/0/00/0/100% 01/16/2013 12/31/2012 SWPPP is complete except for one BMP Item, Storm Nvater Anderson/R covering of storm drains during fueling. " SWPPP" Plan M 18 West Side Trees AMG $25,000 0 0/0/00/0/100% 01/16/2013 TBD Working Nvith City departments to remove more trees in 2013 19 506 Building Econ TBD N/A 01/16/2013 Update Dev /AMG 21 Wildlife Hazard AMG $75,000- N/A 01/15/2014 TBD Project on hold, aNvaiting grant funding (state & Assessment $100,000 federal) 23 Young Eagles AMG N/A N/A 01/16/2013 AMG has advertised around the Airport for all EAA members to come to the office to talk about signing up for young eagles 24 EAA Chapter AMG N/A N/A 01/16/2013 AMG has advertised around the Airport for all EAA members to form an Auburn Valley chapter based here at auburn. Last Revision Date:12/17/12 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX COMPLETED 4 PROJECT LEAD Estimated Actual Funds COMPL. STATUS DESCRIPTION COST COST FAA/WSDOT /Airport Fund DATE 3 Hangar Rows 9 & Steve $250,000 $88,615 0 0/0/00/0/100% 8/31/2012 Completed 2 days early. 10 roof Burke /AMG/ Bob Jones 22 2131 Building AMG N/A $6,038 0 0/0/00/0/100% 8/1/2012 Airtech is a Tenant as of 8/1/12. Update 14 Fuel Dispenser AMG $10,000 $8,410 0 0/0/00/0/100% 6/8/2012 Completed. Replacement 2 Airport Rules and AMG N/A N/A N/A 9/20/2010 Completed Regulations 10 Aircraft Wash Rack AMG $150,000 $14,466 0 0/0/00/0/100% 3/31/2012 Completed 7 MAI Appraisal AMG N/A $5,300 0 0/0/00/0/100% 12/31/2010 Completed 1 Airport Storm Reid $50,000 $105,367 0 0/0/00/0/100% 4/20/2011 Completed Water Design Middleton/AMG Update 4 RunwaN- Lighting Steve $350,000 $467,906 95 0/o12.5 %12.5% 6/2/2011 Construction Completed. Replacement Burke/Reid Middleton/AMG 5 Storm Water Robert N/A N/A N/A 4/8/2011 Project Completed Retention Ponds Lee /Storm Water /Coleman 6 Airport Hangar AMG N/A N/A N/A 9/7/2011 Completed Inspection 8 Drainage Tim Carlaw N/A N/A N/A Recent observation — no change since last Mitigation report. No standing Nvater. Monitoring and Nvill update as necessary 17 Repair of Storm AMG $25,000 $23,794 0 0/0/00/0/100% 11/11/2011 Completed Water Catch Basins Last Revision Date:12/17/12