HomeMy WebLinkAbout4923 RESOLUTION NO. 4 9 2 3
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AUTHORIZING THE MAYOR
AND CITY CLERK TO EXECUTE AMENDMENT 2 TO
GRANT AGREEMENT RCO U9-1429R BETWEEN THE
CITY OF AUBURN AND THE WASHINGTON STATE
RECREATION AND CONSERVATION OFFIGE FOR AN
INCREASE IN GRANT FUNDING
WHEREAS, The City of Aubum was awarded a grant of Three Hundred Four
Thousand, One Hundred Three dollars and no cents ($304,103.00) from the
Washington State Salmon Recovery Funding Board (SRFB) in 2009 in connection with
its Fenster Levee Setback and Floodpiain Restoration Project (Phase I I) ("Project"); and
WHEREAS, Grant Agreement No. 09-1429R between the City of Auburn and the
Washington Recreation and Conservation Office (RCO) to provide those funds for the
Project was executed on April 15, 2010; and
WHEREAS, Amendment No. 1 to Grant Agreement No. 09-1429R increasing the
SRFB funds available to the Project to Four Hundred Thousand One Hundred Three
dollars and no cents ($404,103.00) was executed by the City of Auburn and RCO on
November 22, 2010; and
WHEREAS, the Ciry has requesteii an amendment to the project agreement tb
account for the City's unanticipated construction costs, and upon recommendation of
the WRIA 9 Forum, the SRFB has agreed to the amendment; and
WHEREAS, the amendment will result in Three Hundred Twenty-Seven
Thousand Three Hundred Fifty Three dollars and no cents ($327,353.00) in additional
Salmon Federal awarded funds to the City for the Project, but will require an additional
sponsor match of Fifty Seven Thousand Seven Hundred Sixty-Eight dollars and no
Resolution No. 4923
February 28, 2013
Page 1 of 2
cents ($57,768.00) from the City; and
WHEREAS, it is in the public interest for the parties to enter into an agreement to
amend the project agreement with RCO
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. That the Mayor and City Clerk are hereby authorized to execute an
Agreement between the City and the Washington State Recreation and Conservation
Office to increase the grant amount, which agreement shall be in substantial conformity
with the agreement attached hereto as Exhibit A and incorporated herein by this
reference.
Section 2. That the Mayor is authorized to implement such administrative
procedures as may be necessary to carry out the directives of this legislation.
Section 3. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
Dated and Signed this �day of�/%/��c�t� , 2013
CI O
PET R B. LEWIS, MAYOR
ATTEST
�0� °o ��
Danielle E. Daskam, City Clerk
APPROVED AS TO FOR �
aniel B. Heid, City Attorney
Resolution No. 4923
February 28, 2013
Page 2 of 2
• y •< WRSXINGTON STNTE
� ,��� Recreationand
_....—�'� Conseroation Office Amendment to Project Agreement
Project Sponsor• City of Auburn Project Number• 09-1429R
Project Title: Fenster Levee Setback & Floodplain Restoratior Amendment Number• 2
Amendment Type:
Cost Change
Amendment Description:
The project agreement is increased by$57,768 of sponsor match and$327,353 of Salmon Federal awarded to
project 12-1444 by the SRFB on December 6, 2012 to afford higher than anticipated setback levee construction
costs and project metrics are corrected to accurately reflect the restoration work.
Project Funding:
The total cost of the project for the purpose of this Agreement changes as follows:
Old Amount New Amount
Amount % Amount %
RCO -PSAR $100,000.00 15.65% $100,000.00 9.76%
RCO •SALMON FED PROJ $304,103.00 47.58% $631,456.00 61.65%
Project Sponsor $235,000.00 36.77% $292,768.00 28.58%
TotalProjectCost $639,103.00 100% $1,024,224.00 100%
Admin Limit $0.00 0.00% $0.00 0.00%
A&E Limit $147,485.31 30.00% $236,359.38 30.00%
Agreement Terms
In all other respects the Agreement, to which this is an Amendment, and attachments thereto, shall
remain in full force and effect. In witness whereof the parties hereto have executed this Amendment.
State Of Washington City of Auburn
Recreation and Conservation Office
AGENCY• C �7�� a-F a rv�
BY (� � BY
KaleenCottinqham lJ��e✓ �- ���,��
/
TITLE. Director
TITLE. 11/q.VU �L�
DATE: 7�/,�//3
DATE: �IAR 1 $ 2013
Pre-approved astoform:
BY /S/ 1
Assistant Attorney General
SALProject Cost Change Amendment
Salmon Fundina Accounts Chapter 77.85 RCW Chaoter 420 WAC
AMENAGRt.RPT �
Amendment Agreement Description
Project Sponsor• City of Auburn Project Number• 09-1429 R
Project Titie: Fenster Levee Setback & Floodplain Restoration II Amendment Number• 2
Agreement Description
The City of Aubum wiil use this funding reconnect the'Green River(RM 32)with a portion of its historic floodplain. The
project is located in the 2100 block of 2nd Street SE.in Auburn, and adjacent to the downstream end of an intact two-mile
long riparian corridor within the city's Fenster Nature Park and King County's Auburn Narrows Natural Area.
The goals of the project are to restore degraded salmonid habitat and impaired river/floodplain functions in an urban
setting by�
1) improving instream salmonid habitat by re establishing a more complex channel cross section and riparian buffer,
2) increasing floodplain connectivity and function,
3) maintaining the existing level of flood protection for adjacent homes and inftastructure, and
4)where possibie, providing for increased flood attenuation and flood storage.
This levee setback project builds upon prior SRFB funded restoration efforts by the city and county to set back or
completely remove ail of the levees within a two-mile stretch of high-quality habitat behveen this proposed project site
and the SR-18 bridge. The project will a) remove up to 800 feet of the existing Fenster revetment berm, rock, and tFie
associated gravel access road adjacent to the river channel; b)construct a new burie�toe revetment'setback levee'
approximately 300 feet landward of the river; and c) install flood fencing and riparian planting. The habitat improvements
will benefit,Chum, Coho, and ESA-listed Puget Sound ESU Chinook salmon and steeihead that migrate through and
spawn in this reach. Project deiiverables wili include those listed in Manual 18 Appendixes D-2, D-3 and D,4:
AAGREEDSC.RPT February 11 2013 Page 1
� Amendment Eligible Scope Activities
Project Sponsor• City of Auburn Project Number.09-1429
Project'fiUe: Fenster Levee Setback& Fioodplain Restoration II Project Type:Restoration
Program: Salmon Federal Projects Amendment#• 2
Restoration Metrics
Worksite#1, Fenster Levee Setbac�c Phase II
Targeted salmonid ESU/DPS: Chinook Salmon-Puget Sound ESU,
Chum SalmorrPuget SouncUStrait of
Georgia ESU, Coho Salmon-Puget
SoundlStrait of Georgia ESU, Pink
Salmon-Odd year ESU,
Steelhead-Puget Sound DPS
Targeted species (non-ESU species): Buil Trout, Cutthroat
Project Identified In a Plan or Watershed Assessment: Green River Chapter of the Puget Sound
Chinook Recovery Plan, 2005.
Type Of Monitoring: Implementation Monitoring
Instream Habitat Project
Totai Miles Of Instream Habitat Treated: 0.15
Channel reconfiguration and connectivity
Type of change to channel configuration and connectivity� CreationlConnection to Off-Channel
Habitat
Miles of Stream Treated for channel reconfiguration and connectiviry� 0.15
Miles of Off-Channel Stream Created: 0.00
Acres Of Channel/Off-Channel Connected Or Added: 2.5
2.5 acres of floodplain raconnected.
Instream Pools Created/Added: Z
Plant remaval/conUol
Miles of Stream Treated for plant removallcontroi: 0.15
Acres of Streambed Treated for plant removal/control: 2.5
Streambank stabilization
Miles of Streambank Stabilized: 0.15
Setback Levee
Riparian Habitat Project
Total Riparian Miles Streambank Treated: 0.15
Total Riparian Acres Treated: 2.5
Planting
Acres Planted in riparian: 2.5
Cultural Resources
Cultural resources
Permits
Obtain permits
Architectural & Engineering
Architectural 8 Engineering (A8E)
AELIGREIM.RPT February 11,2013 Page: 1
� Amendment Special Conditions
. , ,
l. SRFB Review Panel Special Condition:Due to the conceptual level of the current design, the SRFB Review Panel
conditioned this project for review and approval of the,preliminary design documents. The preliminary design drawings
and design report shall be provided to the RCO Grant,Manager once complete. The Review Panel will require a 30-day
review period to provide comments to the project sponsor, once all documents have been provided. Permits should not
be applied for prior to Review Panel design review being completed.
ll, Habitat Restoration on State Owned Aquatic Lands:The Department of Natural Resources, Aquatics Program
(DNR) has determined that the irrwater portion of this project occurs on state owned aquatic lands(SOAL) managed by
the DNR on behalf of the State of Washington, and finds the proposed activities are covered under the terms of DNR
Aquatic Lands Easement No. 54082545(09-1429 PRISM attachments 22-23), granted to King County Flood Control
District in 2008. -
1 Sponsor shall coordinate with DNR to secure a signed Appendix K Landowner Acknowledgement Form as soon
as possible.
2. Relative to the project proponents(Licensee)compliance with the terms of DNR Easement, the Licensee is
required to submit JARPA and Attachment E, with original signature, to DNR. Attachment E provides for,the
Licensee to indicate that an existing agreement is in place at the location of the project proposal.
3. The Licensee is responsible for compliance of all Easement terms, specifically Subsection 7.3 Construction,
Major Repair, Modification and Demolition.
Before restoration construction begins, you wiil need to:
secure authorization with the DNR to do the project on their land,
submit a copy ot the DNR authorization to RCO. Whatever the form, the authorization is not a,permit, but a
contracYto use the lands.
DNR recommends sponsors contact DNR's Aquatic Resources Program staff early in the desig� process, before
applying for permits in order to avoid delays in receiving an authorization and for the following reasons:
To ensure the land is available.
To determine if the proposed use is appropriate.
To avoid or minimize impacts to aquatic resources.
lll. CulWral Resources Consultation:This project is subject to Governor's Executive Order OS-OS Archaeological and
Cultural Resources(EO OS-OS) as described in Section 9 of this project agreement. RCO will need to initiate cultural
resources consultation following EO 05-05 for all ground disturbing activities. Completion of this consultation and a
Notice to Proceed from RCO will be required before these ground-disturbing activities can begin.
N Construction and Design Build Projecf Deliverables:The project will meet the standards for Design and
Restora4ion Project Deliverables described in SRFB Manual 18 Appendix D-4"Construction and"Design Build"
Deliverables."'The sponsor must complete three project development stages and provide the associated deliverables for
Preliminary project design, Final project design, and Consfruction phase. More specfically, the sponsor wili provide RCC
the following:
A) Preliminary Design Deliverables(See Appendix D-2 for additional details):Pre�iminary Design Report, Drawings;
and Engineering Cost Estimate;
B) Final Design Deliverables,to be provided before construction: (See Appendix D-3 for additional details):
a) Design Review Comments;
b) Final Design Report and Drawings incorporating comments provided by stakeholders, SRFB, andlor permit
agencies regarding the preliminary design report and on-site review.
c) T'echnicai Specifications for construction;
d) Final Construction Quantities and Costs;
e) Contract Bidding Documents and General Contract Conditions(unless the projed will be built by sponsor
crew); and
fl Construction permits
C) Post Construction Deliverables(See Appendix Q4 for additional details):
a) "As-builY' Drewings.
ASPECCOND.RPT February 91 2013 Page 2
�
Amendment Special Conditions
Project Sponsor• City of Auburn Project Number• 09-1429 R
Project Title: Fenster Levee Setback & Floodplain Restoration II Amendment Number• 2
Special Conditions
,
ASPECCOND.RPT Feb�uBry 11 2013 ,Peg9 1