City of Auburn Transportation Improvement Program
TTrraannssppoorrttaattiioonn IImmpprroovveemmeenntt
PPrrooggrraamm
22001144--22001199
Adopted by Auburn City Council
June 17, 2013
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)-931-3010
www.auburnwa.gov
City of Auburn Transportation Improvement Program
ii
Cover Photos: Left: 22nd Street SE Rebuild, Right: M St Underpass Project
RESOLUTION NO. 4 937
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE 2014-2019
TRANSPORTATIONIMPROVEMENT PROGRAM OF THE CITY OF
AUBURN PURSUANT TO R.C.W. CHAPTER 35.77OF THE LAWS
OF THESTATE OF WASHINGTON
WHEREAS, RCW 35.77.010 requires that the legislative body of each City
prepare and adopt a comprehensiveTransportationImprovement Program (TIP)
for the ensuing six years, but only afterconducting a public hearing; and
WHEREAS, a publichearing to reviewthe2014-2019 Transportation
Improvement Program for theCity of Auburnwas held on June 17, 2013 at the
hourof 7:30 p.m. in theCouncilChambers of the Auburn City Hall, pursuant to
notice published in the legal newspaperof the City of Auburn on June 6, 2013;
and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBYRESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the
terms of which are incorporated herewith by reference as though fully set forth, a
designationof the streetswithin the corporate limits of the City of Auburn to be
improved in the manner therein set forthduring the year set for the improvement
of such street or streets.
Section 2. That the City Engineerof the City of Auburn is hereby directed
to forward a certified copy of this Resolution to the Washington State Department
ofTransportation for filing not morethan thirty (30) days after theadoption of this
Resolution.
Section 3. That the Mayor is herebyauthorized to implement such
administrative procedures as may be necessary to carry out the directionsof this
legislation.
Section 4. Thatthis Resolution shall take effect andbe in full force upon
passage and signatures hereon.
Resolution No. 4937
June 3, 2013
Page 1
DATED this`Z dayof June, 2013
RN
PETER B. LEWIS
MAYOR
ATTEST:
Danielle E. Daskam,
City Clerk
APP13QV S TO FOR
aniel B. Heid,
City Attorney
Resolution No. 4937
June 3, 2013
Page 2
City of Auburn Transportation Improvement Program
v
Transportation Improvement Program
2014-2019
Table of Contents
Executive Summary .................................................................................................................................. 1
Introduction ............................................................................................................................................... 1
Projects & Financing Plan Summary ..................................................................................................... 3
Financial Constraint & Fund Balance Summary .................................................................................. 13
Roadway Improvement Projects ........................................................................................................... 15
A Street NW, Phase 1 (TIP# 1) ............................................................................................................. 15
AWS Ped Improvements (TIP# 2) ........................................................................................................ 16
Auburn Way Corridor (TIP# 3) ............................................................................................................ 17
I Street NE Corridor (TIP# 4) ............................................................................................................... 18
M Street Underpass (TIP# 5) ................................................................................................................ 19
S 277th Street (TIP# 6) ......................................................................................................................... 20
15th Street SW Reconstruction (TIP# 7) .............................................................................................. 21
A Street NW, Phase 2 (TIP# 8) ............................................................................................................. 22
D Street NW (TIP# 9) ........................................................................................................................... 23
F Street SE (TIP# 10) ............................................................................................................................ 24
M Street NE (TIP# 11) .......................................................................................................................... 25
Grade-Separated Crossing of BNSF Yard (TIP# 12) ........................................................................... 26
8th Street NE Widening (TIP# 15) ....................................................................................................... 27
49th Street NE (TIP# 16) ...................................................................................................................... 28
Citywide Guardrail Improvements (TIP# 25) ....................................................................................... 29
BNSF 3rd Rail Expansion Roadway Improvements (TIP# 33) ............................................................ 30
124th Ave SE Corridor Improvements, Phase 2 (TIP# 39) .................................................................. 31
124th Ave SE Corridor Improvements, Phase 1 (TIP# 40) .................................................................. 32
R Street Bypass (TIP# 41) .................................................................................................................... 33
SE 320th Street Corridor Improvements (TIP# 42) .............................................................................. 34
AWS (SR-164) Corridor Safety Improvements (TIP# 43) ................................................................... 35
W Main Street Improvements (TIP# 55) .............................................................................................. 36
AWS Corridor Improvements (TIP# 58) .............................................................................................. 37
M Street SE Corridor (TIP# 60)............................................................................................................ 38
AWS Bypass (TIP# 61) ........................................................................................................................ 39
AWS Streetscape Improvements (TIP# 62) .......................................................................................... 40
Lea Hill Rd Segment 1 (TIP# 64) ......................................................................................................... 41
Lea Hill Rd Segment 2 (TIP# 65) ......................................................................................................... 42
Lea Hill Rd Segment 3 (TIP# 66) ......................................................................................................... 43
Intersection, Traffic Signal & ITS Improvements ............................................................................... 45
M Street SE/12th Street SE Traffic Signal (TIP# 14) ........................................................................... 45
Harvey Rd NE/8th St NE Intersection Improvements (TIP# 17) ......................................................... 46
8th Street NE/SE 104th St Intersection Improvements (TIP# 18) ........................................................ 47
City of Auburn Transportation Improvement Program
vi
Auburn Way North/1st Street NE Signal Improvements (TIP# 19) ..................................................... 48
AWS/M Street SE Intersection Improvements (TIP# 20) .................................................................... 49
Main Street Signal Upgrades (TIP# 21)................................................................................................ 50
Traffic Signal Improvements (TIP# 34) ............................................................................................... 51
37th Street NW/B Street NW Railroad Crossing Safety Improvements (TIP# 38) .............................. 52
ITS Dynamic Message Signs (TIP# 50) ............................................................................................... 53
East Valley Hwy ITS Expansion (TIP# 51) .......................................................................................... 54
8th Street NE and C Street NW ITS Improvements (TIP# 52) ............................................................. 55
AWS/12th Street SE Intersection Improvements (TIP# 53) ................................................................. 56
Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements (TIP# 59) .................................... 57
29th St SE/R St SE Intersection Improvements (TIP# 63) ................................................................... 58
Citywide Traffic Signal Safety Improvements (TIP# 67) ..................................................................... 59
Non-Motorized & Transit Improvements ............................................................................................ 61
A Street SE Non-Motorized and Access Improvements (TIP# 23) ...................................................... 61
Academy Drive Multi-Use Trail (TIP# 24) .......................................................................................... 62
Metro Shuttle (TIP# 26) ........................................................................................................................ 63
Citywide Pedestrian Accessibility Program (TIP# 30) ......................................................................... 64
Citywide Arterial Bicycle and Safety Improvements (TIP# 31) .......................................................... 65
Citywide Sidewalk Repair and Improvements (TIP# 32) ..................................................................... 66
A Street NE Pedestrian Improvements (TIP# 44)................................................................................. 67
Interurban Trailhead Improvements (TIP# 45) ..................................................................................... 68
Lea Hill Safe Routes to School Improvements (TIP# 56) .................................................................... 69
Preliminary Engineering & Miscellaneous Projects ............................................................................ 71
Mohawk Plastics Site Mitigation (TIP# 13) ......................................................................................... 71
A Street SE Safety Improvements Study (TIP# 27) ............................................................................. 72
S 277th St - Wetland Mitigation (TIP# 29) .......................................................................................... 73
104th Ave SE & Green River Road Study (TIP# 46) ........................................................................... 74
Environmental Park Roadway Improvements Study (TIP# 47) ........................................................... 75
Downtown to Les Gove Non-Motorized Improvements Study (TIP# 48) ........................................... 76
S 316th St Bike and Ped Improvement Study (TIP# 49) ...................................................................... 77
Kersey Way SE Corridor Study (TIP# 54) ........................................................................................... 78
Roadway Preservation Projects ............................................................................................................. 79
West Valley Highway System Preservation (TIP# 22) ......................................................................... 79
Annual Bridge Structure Preservation (TIP# 28) .................................................................................. 80
Arterial Street Preservation Program (TIP# 35) ................................................................................... 81
Arterial Crack Seal Program (TIP# 36) ................................................................................................ 82
Local Street Improvement Program (TIP# 37) ..................................................................................... 83
Arterial Bridge Deck Rehabilitation (TIP# 57) .................................................................................... 84
Project Summary Sheet …………………………………….……………………………….Appendix A
2014-2019 TIP Project Map…..…………..………………………………………………….Appendix B
City of Auburn Transportation Improvement Program
Executive Summary & Introduction 1
EXECUTIVE SUMMARY
The Transportation Improvement Program (TIP) is a 6-year plan for transportation improvements that
supports the City of Auburns current and future growth. The TIP along with the Comprehensive
Transportation Plan (CTP) serve as source documents for the City of Auburn Capital Facilities Plan
which is a Comprehensive Plan element required by Washington’s Growth Management Act. The
program may be revised at any time by a majority of the City Council after a public hearing.
INTRODUCTION
Purpose
The purpose of the TIP is to identify priority transportation projects and assure that the city has
advanced plans as a guide in carrying out a coordinated transportation program. There are always more
projects than available revenues. Therefore, a primary objective of the TIP is to integrate the two to
produce a comprehensive, realistic program for the orderly development and maintenance of our street
system. Projects are required to be included in the TIP in order to be eligible for state and federal grants.
Grant funding for projects listed may not yet be secured.
Statutory Requirements
Six Year Transportation Improvement Program - RCW 35.77.010 requires that each city prepare and
adopt a comprehensive transportation improvement program for the ensuing six calendar years
consistent with its CTP. This six-year TIP shall be filed with the Secretary of the Washington State
Department of Transportation (WSDOT) each year within 30 days of adoption.
Projects of Regional Significance - RCW 35.77.010 also requires each city to specifically set forth those
projects and programs of regional significance for inclusion in the transportation improvement program
for that region. The 2014-2019 TIP includes six projects of regional significance:
TIP Project Number Project Title
TIP # 6 S 277th Street Widening
TIP #50 ITS Dynamic Message Signs
TIP #51 East Valley Highway ITS Expansion
TIP #58 AWS Corridor Improvements
City of Auburn Transportation Improvement Program
Executive Summary & Introduction 2
Methodology
Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable estimate of
funding available to accomplish the transportation improvement needs. Since the desire to construct
transportation improvements typically exceeds the available forecast revenue, it is necessary to establish
some method of prioritizing the needs.
Transportation needs are identified by examining the latest information concerning level of service,
safety and accident history, growth trends, traffic studies and the City’s adopted CTP. The likelihood of
receiving federal or state grants for various improvements, community interests and values are also
considered. All of these factors yield a prioritized list of transportation improvements.
Projects are placed into one of the following categories;
Roadway Improvements,
Intersection, Signal & Intelligent Transportation System Improvements,
Non-Motorized & Transit Improvements,
Preliminary Engineering & Miscellaneous Projects, and
Roadway Preservation Projects.
Each project is identified as a Capacity or Non-capacity improvement and those that lay within the limits
of a defined Arterial LOS Corridor per with Table 2-2 of the City’s CTP are identified accordingly.
Capacity projects from the 6-year plan are incorporated into the CTP as Group A projects. Longer term
capacity projects are listed in the CPT as Group B Projects.
Detailed project costs and funding sources are identified and provided for each project listed in the
proposed TIP. The prioritized list is then financially constrained in the first three years to reflect the
financial projections to yield the six-year Transportation Improvement Program. After completing all
reviews and compiling the document, staff makes final recommendations to the Planning and
Community Development Committee and City Council for approval.
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 3
Projects & Financing Plan Summary
20142015 2016 2017 20182019Total
TIP#Roadway Improvement Projects
1 A Street NW, Phase 1 ($8.1M expended prior to 2014)
Capital Costs 25,000 350,000 25,000 25,000 25,000 25,000 475,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees25,000 350,000 25,000 25,000 25,000 25,000 475,000
2 AWS Pedestrian Improvements, Dogwood St SE to Fir St SE ($1.1M expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees- - - - - - -
3 Auburn Way Corridor, 4th St NE to 4th St SE
Capital Costs - - - 818,700 - 3,000,000 3,818,700
Funding Sources:
Unrestricted Street Revenue- - - 110,000 - 600,000 710,000
Grants (Fed,State,Local)- - - 708,700 - 2,400,000 3,108,700
Traffic Impact Fees- - - - - - -
4 I Street NE Corridor, 45th St NE to S 277th St ($162K expended prior to 2014)
Capital Costs - - - 6,760,000 - - 6,760,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - 1,000,000 - - 1,000,000
Traffic Impact Fees- - - - - - -
Other (Development)- - - 5,760,000 - - 5,760,000
5 M Street Underpass, 3rd St SE to 8th St SE ($22.5M expended prior to 2014)
Capital Costs 109,550 109,070 108,590 107,550 106,520 105,490 646,770
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees109,550 109,070 108,590 107,550 106,520 105,490 646,770
Traffic Mitigation Fees- - - - - - -
PWTF Loan- - - - - - -
Other (Agencies)- - - - - - -
6 S 272nd/277th St Corridor ($1.26M expended prior to 2014)
Capital Costs 153,000 5,187,300 - - - - 5,340,300
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)153,000 3,896,600 - - - - 4,049,600
Traffic Impact Fees- 290,700 - - - - 290,700
Other (Development)- 1,000,000 - - - - 1,000,000
7 15th St SW Reconstruction
Capital Costs - - 375,000 3,000,000 - - 3,375,000
Funding Sources:
Unrestricted Street Revenue- - 75,000 500,000 - - 575,000
Grants (Fed,State,Local)- - 300,000 2,500,000 - - 2,800,000
Traffic Impact Fees- - - - - - -
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 4
201420152016201720182019Total
TIP#Roadway Improvement Projects (Continued)
8 A Street NW, Phase 2
Capital Costs:- 150,000 - 3,000,000 - - 3,150,000
Funding Sources:
Unrestricted Street Revenue- 150,000 - - - - 150,000
Grants (Fed,State,Local)- - - 3,000,000 - - 3,000,000
Traffic Impact Fees- - - - - - -
9 D Street NW, 37th St NW to 44th St NW ($6M beyond 2019)
Capital Costs - - - 300,000 - 6,000,000 6,300,000
Funding Sources:
Unrestricted Street Revenue - - - - - - -
Grants (Fed,State,Local)- - - 250,000 - 5,000,000 5,250,000
Traffic Impact Fees- - - 50,000 - 1,000,000 1,050,000
10F Street SE, 4th St SE to AWS ($8K expended prior to 2014)
Cap ital Costs 250,000 - 2,250,000 - - - 2,500,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)200,000 - 2,000,000 - - - 2,200,000
Traffic Impact Fees50,000 - 250,000 - - - 300,000
11 M Street NE, E Main St to 4th St NE
Capital Costs 50,000 275,000 1,150,000 - - - 1,475,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- 225,000 1,000,000 - - - 1,225,000
Traffic Impact Fees50,000 50,000 150,000 - - - 250,000
12 Grade-Separated Crossing of BNSF Railyard ($31M beyond 2019)
Capital Costs- - - - - 1,125,000 1,125,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees- - - - - -
Other (Development)- - - - - 1,125,000 1,125,000
15 8th Street NE Widening, Pike St to R St NE
Capital Costs - 450,000 1,000,000 - - - 1,450,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- 360,000 800,000 - - - 1,160,000
Traffic Impact Fees- 90,000 200,000 - - - 290,000
16 49th Street NE, Auburn Way North to I St NE
Cap ital Costs 850,000 2,500,000 - - - - 3,350,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)850,000 2,500,000 - - - - 3,350,000
25 Citywide Guardrail Improvements ($552K expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Fed,State,Local)- - - - - - -
REET- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)- - - - - - -
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 5
201420152016201720182019Total
TIP#Roadway Improvement Projects (Continued)
33 BNSF 3rd Rail Expansion Roadway Improvements
Capital Costs 25,000 - - - - - 25,000
Funding Sources:
Unrestricted Street Revenue25,000 - - - - - 25,000
Grants (Fed,State,Local)- - - - - - -
Reet- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)- - - - - - -
39 124th Ave SE Corridor Improvements Phase 2
Capital Costs - - - 100,000 750,000 - 850,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - - 85,000 650,000 - 735,000
Traffic Impact Fees- - - 15,000 100,000 - 115,000
40 124th Ave SE Corridor Imp rovements Phase 1
Capital Costs 200,000 2,750,000 - - - - 2,950,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- 2,200,000 - - - - 2,200,000
Traffic Impact Fees200,000 550,000 - - - - 750,000
41 R Street Bypass
Capital Costs - - - - - 408,000 408,000
Funding Sources:
Unrestricted Street Revenue- - - - - 81,600 81,600
Grants (Fed,State,Local)- - - - - 326,400 326,400
Traffic Impact Fees- - - - - - -
42 SE 320th Street Corridor Im provements
Capital Costs - 50,000 60,000 580,000 - - 690,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - 47,500 502,000 - - 549,500
Traffic Impact Fees- 50,000 12,500 78,000 - - 140,500
43 Auburn Way South (SR-164) Corridor safety Improvements ($252K expended prior to 2014)
Capital Costs 2,083,108 - - - - - 2,083,108
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)2,083,108 - - - - - 2,083,108
Traffic Impact Fees- - - - - - -
55 W Main Street Improvements
Capital Costs - - - 640,000 2,850,000 - 3,490,000
Funding Sources:
Unrestricted Street Revenue- - - 160,000 570,000 - 730,000
Grants (Fed,State,Local)- - - 480,000 2,280,000 - 2,760,000
REET- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)- - - - - - -
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 6
201420152016201720182019Total
TIP#Roadway Improvement Projects (Continued)
58 Auburn Way South Corridor Improvements, Fir to Hemlock ($3.0M expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Fed,State,Local)- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Muckleshoot)- - - - - - -
60 M Street SE Corridor, 8th St SE to AWS
Capital Costs - - - 1,925,000 4,750,000 - 6,675,000
Funding Sources:
Unrestricted Street Revenue- - - 250,000 250,000 - 500,000
Grants (Fed, State, Local)- - - 925,000 3,750,000 - 4,675,000
Traffic Impact Fees- - - 750,000 750,000 - 1,500,000
61 Auburn Way South Bypass
Capital Costs - - - - - 6,000,000 6,000,000
Funding Sources:
Unrestricted Street Revenue- - - - - 1,200,000 1,200,000
Grants (Fed, State, Local)- - - - - 4,800,000 4,800,000
Traffic Impact Fees- - - - - - -
62 Auburn Way South Streetscape Improvements, SR 18 to M St SE
Cap ital Costs - - - 1,950,000 2,800,000 - 4,750,000
Funding Sources:
Unrestricted Street Revenue- - - 200,000 200,000 - 400,000
Grants (Fed, State, Local)- - - 1,750,000 2,600,000 - 4,350,000
Traffic Impact Fees- - - - - - -
REET2- - - - - - -
64 Lea Hill Road Segment 1, R St NE to 105th Pl SE
Capital Costs - - 50,000 2,450,000 10,000,000 - 12,500,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - 50,000 1,950,000 8,000,000 - 10,000,000
Traffic Impact Fees- - - 500,000 2,000,000 - 2,500,000
65 Lea Hill Road Segment 2, 105th Pl SE to 112th Ave SE
Cap ital Costs - - - - 3,500,000 8,500,000 12,000,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - - 2,900,000 7,100,000 10,000,000
Traffic Impact Fees- - - - 600,000 1,400,000 2,000,000
66 Lea Hill Road Segment 3, 112th Ave SE to 124th Ave SE
Capital Costs - - - 4,000,000 - - 4,000,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - 3,000,000 - - 3,000,000
Traffic Impact Fees- - - 1,000,000 - - 1,000,000
Subtotal, Roadway Improvement Projects:
Capital Costs3,748,658 11,821,370 5,018,590 25,656,25024,781,52025,163,490 96,189,878
Funding Sources
Unrestricted Street Revenue28,000 150,000 75,000 1,220,000 1,020,000 1,881,600 4,374,600
Grants2,436,108 6,681,600 4,197,500 16,150,700 20,180,000 19,626,400 69,272,308
Traffic Impact Fees434,550 1,489,770 746,090 2,525,550 3,581,520 2,530,490 11,307,970
Other (Other Agencies)- - - - - - -
Other (Development)850,000 3,500,000 - 5,760,000 - 1,125,000 11,235,000
Other (Muckleshoot Tribe)- - - - - - -
PWTF- - - - - - -
REET2- - - - - - -
Total Funding3,748,658 11,821,370 5,018,590 25,656,250 24,781,520 25,163,490 96,189,878
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 7
201420152016201720182019Total
TIP#Intersection, Signal & ITS Improvement Projects
14 M St SE & 12th St SE Traffic Signal
Capital Costs - - - 625,000 - - 625,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - 500,000 - - 500,000
Traffic Impact Fees- - - 125,000 - - 125,000
17 Harve y Road & 8th St NE Intersection Improvements ($2.1M expended prior to 2014)
Capital Costs 86,500 86,000 85,600 85,200 84,800 84,400 512,500
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees86,500 86,000 85,600 85,200 84,800 84,400 512,500
18 8th St NE & 104th St NE Intersection Improvements ($430K expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Federal)- - - - - - -
REET2- - - - - - -
Traffic Impact Fees- - - - - - -
19 Auburn Way North/1st Street NE Signal Improvements
Cap ital Costs 50,000 - 550,000 - - - 600,000
Funding Sources:
Unrestricted Street Revenue50,000 - 125,000 - - - 175,000
Grants (Fed, State, Local)- - 425,000 - - - 425,000
Traffic Impact Fees- - - - - - -
20 Auburn Way South and M Street SE Intersection Improvements ($383K expended prior to 2014)
Capital Costs 315,957 - - - - - 315,957
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Federal)315,957 - - - - - 315,957
Traffic Impact Fees- - - - - - -
Traffic Mitigation Fees- - - - - - -
21 Main Street Signal Upgrades ($200k ex pended p rior to 2014)
Capital Costs 265,000 - - - - - 265,000
Funding Sources:
Unrestricted Street Revenue265,000 - - - - - 265,000
Grants (Fed, State, Local)- - - - - - -
Traffic Mitigation Fees- - - - - - -
34 Traffic Signal Improvements $175,000 expended prior to 2014)
Capital Costs 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000
Funding Sources:.
Unrestricted Cap. Imp. Revenue 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Grants (Fed, State, Local)- - - - - - -
REET2150,000 150,000 150,000 150,000 150,000 150,000 900,000
38 37th & B St NW Railroad Crossing Safety Improvements ($358K expended prior to 2014)
Capital Costs 26,900 - - - - - 26,900
Funding Sources:
Unrestricted Street Revenue26,900 - - - - - 26,900
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 8
201420152016201720182019Total
TIP#Intersection, Signal & ITS Improvement Projects (Continued)
50 ITS Dynamic Message Signs
Capital Costs - 220,000 - 220,000 - - 440,000
Funding Sources:
Unrestricted Street Revenue- 30,000 - 30,000 - - 60,000
Grants (Fed, State, Local)- 190,000 - 190,000 - - 380,000
Traffic Impact Fees- - - - - - -
51East Valley Highway ITS Expansion
Cap ital Costs - - 800,000 - - - 800,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants- - 692,000 - - - 692,000
Traffic Impact Fees- - 108,000 - - - 108,000
52 8th Street NE and C Street NW ITS Improvements ($50k expended prior to 2014)
Capital Costs 5,000 - - - - - 5,000
Funding Sources:
Unrestricted Street Revenue5,000 - - - - - 5,000
Grants (Fed,State,Local)- - - - - - -
REET- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)- - - - - - -
53 AWS and 12th Street Intersection Improvements ($50k expended prior to 2014)
Capital Costs - - 250,000 - - - 250,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - 250,000 - - - 250,000
REET- - - - - - -
Traffic Impact Fees- - - - - - -
Other (Development)- - - - - - -
59 Auburn Ave & 3rd St NE Pedestrian & Access Improvements ($9K expended prior to 2014)
Capital Costs 50,000 - 300,000 - - - 350,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed,State,Local)- - 250,000 - - - 250,000
Traffic Impact Fees50,000 - 50,000 - - - 100,000
63 29th Street SE & R Street SE Intersection Improvements
Capital Costs - - - 1,800,000 - - 1,800,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - 1,300,000 - - 1,300,000
Traffic Impact Fees- - - 500,000 - - 500,000
REET2- - - - - - -
67 Citywide Traffic Signal Safety Im provement ($482K expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
Subtotal, Intersection, Signal & ITS Imp. Projects:
Capital Costs976,357 481,000 2,160,600 2,905,200 259,800 259,400 7,042,357
Funding Sources:
Unrestricted Street Revenue373,900 55,000 150,000 55,000 25,000 25,000 683,900
Grants (Fed, State, Local)315,957 190,000 1,617,000 1,990,000 - - 4,112,957
Traffic Impact Fees136,500 86,000 243,600 710,200 84,800 84,400 1,345,500
Traffic Mitigation Fees- - - - - - -
REET2150,000 150,000 150,000 150,000 150,000 150,000 900,000
Total Fundin g 976,357 481,000 2,160,600 2,905,200 259,800 259,400 7,042,357
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 9
201420152016201720182019Total
TIP:Non-Motorized & Transit Improvement Projects
23 A Street SE Non-Motorized and Access Improvements ($224K expended prior to 2014)
Capital Costs 93,047 - - - - - 93,047
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)93,047 - - - - - 93,047
Traffic Impact Fees- - - - - - -
Other (Other Agencies)- - - - - - -
24 Academy Drive Multi-Use Trail
Capital Costs - - 50,000 425,000 425,000 - 900,000
Funding Sources:
Unrestricted Street Revenue- - 50,000 42,500 42,500 - 135,000
Grants (Fed, State, Local)- - - 382,500 382,500 - 765,000
Traffic Impact Fees- - - - - - -
26 METRO Shuttle: Auburn Community and Lakeland Shuttles
Capital Costs 240,000 250,000 250,000 260,000 260,000 270,000 1,530,000
Funding Sources:
Unrestricted Street Revenue240,000 250,000 250,000 260,000 260,000 270,000 1,530,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
30Citywide Pedestrian Accessibility and Safety Program
Capital Costs 150,000 150,000 150,000 150,000 150,000 150,000 900,000
Funding Sources:
Unrestricted Street Revenue150,000 150,000 150,000 150,000 150,000 150,000 900,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
31 Citywide Arterial Bicycle and Safety Improvements
Capital Costs 100,000 - 100,000 - 100,000 - 300,000
Funding Sources:
Unrestricted Street Revenue100,000 - 100,000 - 100,000 - 300,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
32 Citywide Sidewalk Repairs and Improvements ($260K expended prior to 2014)
Capital Costs 125,000 125,000 125,000 125,000 125,000 125,000 750,000
Funding Sources:
Unrestricted Cap. Imp. Funds25,000 25,000 25,000 25,000 25,000 25,000 150,000
Grants (Fed, State, Local)100,000 100,000 100,000 100,000 100,000 100,000 600,000
REET2- - - - - - -
44 A St NE Pedestrian Improvements
Capital Costs - - - 150,000 - - 150,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - 150,000 - - 150,000
Traffic Impact Fees- - - - - - -
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 10
201420152016201720182019Total
TIP:Non-Motorized & Transit Improvement Projects (Continued)
45 Interurban Trailhead Improvements
Capital Costs - - - 210,000 - - 210,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - 210,000 - - 210,000
Traffic Impact Fees- - - - - - -
56 Lea Hill Safe Routes to School Improvements ($399K expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Unrestricted Street Revenue1,000 - - - - - 1,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
Subtotal, Non-Motorized & Transit Projects:
Capital Costs709,047 525,000 675,000 1,320,000 1,060,000 545,000 4,834,047
Funding Sources
Unrestricted Street Revenue491,000 400,000 550,000 452,500 552,500 420,000 2,866,000
Grants193,047 100,000 100,000 842,500 482,500 100,000 1,818,047
Traffic Impact Fees- - - - - - -
Unrestricted Cap. Imp. Funds25,000 25,000 25,000 25,000 25,000 25,000 150,000
Other (Other Agencies)- - - - - - -
Total Funding709,047 525,000 675,000 1,320,000 1,060,000 545,000 4,834,047
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 11
201420152016201720182019Total
TIP#Preliminary Engineering and Miscellaneous Projects
13 Mohawks Plastics Site Mitigation Project ($577K expended prior to 2014)
Capital Costs 25,000 20,000 20,000 65,000 20,000 - 150,000
Funding Sources:
Unrestricted Cap. Imp. Funds- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees25,000 20,000 20,000 65,000 20,000 - 150,000
27 A Street SE Safety Improvements Stud y ($10K expended prior to 2014)
Capital Costs 50,000 - - - - - 50,000
Funding Sources:
Unrestricted Street Revenue50,000 - - - - - 50,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
29 S 277th Street, Wetland Mitigation ($290K Expended Prior to 2014)
Capital Costs 25,000 - - - - - 25,000
Funding Sources:
Unrestricted Street Revenue25,000 - - - - - 25,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees
46 104th Ave SE & Green River Road Stud y
Capital Costs 5,000 - - - - - 5,000
Funding Sources:
Unrestricted Street Revenue5,000 - - - - - 5,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
47Environmental Park Roadway Improvements Study
Cap ital Costs 10,000 - - - - - 10,000
Funding Sources:
Unrestricted Street Revenue10,000 - - - - - 10,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
48 Downtown to Les Gove Non-Motorized Improvements Study
Capital Costs 10,000 - - - - - 10,000
Funding Sources:
Unrestricted Street Revenue10,000 - - - - - 10,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
49 S 316th St Bicycle & Pedestrian Improvement Study
Capital Costs 5,000 - - - - - 5,000
Funding Sources:
Unrestricted Street Revenue5,000 - - - - - 5,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
54 Kersey Way SE Corridor Study
Capital Costs 50,000 - - - - - 50,000
Funding Sources:
Unrestricted Street Revenue- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Traffic Mitigation Fees50,000 - - - - - 50,000
Subtotal, Prel. Eng. and Misc. Projects:
Capital Costs180,000 20,000 20,000 65,000 20,000 - 305,000
Funding Sources
Unrestricted Street Revenue105,000 - - - - - 105,000
Grants- - - - - - -
Traffic Mitigation Fees50,000 - - - - - 50,000
Traffic Impact Fees25,000 20,000 20,000 65,000 20,000 - 150,000
Total Funding180,000 20,000 20,000 65,000 20,000 - 305,000
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 12
201420152016201720182019Total
TIP#Roadway Preservation Projects
22 West Valley Highway System Preservation, 15th St NW to 37th St NW ($1.13M expended prior to 2014)
Capital Costs 1,000 - - - - - 1,000
Funding Sources:
Arterial Preservation Funds1,000 - - - - - 1,000
Grants (Fed, State, Local)- - - - - - -
Utility tax- - - - - - -
28 Annual Bridge Structure Preservation
Capital Costs 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Funding Sources:
Unrestricted Street Revenue50,000 50,000 50,000 50,000 50,000 50,000 300,000
Grants (Fed, State, Local)- - - - - - -
Traffic Impact Fees- - - - - - -
35 Annual Arterial Street Preservation Program
Capital Costs 1,800,000 1,650,000 1,700,000 1,700,000 1,800,000 1,800,000 10,450,000
Funding Sources:
Arterial Preservation Funds- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Utility Tax1,800,000 1,650,000 1,700,000 1,700,000 1,800,000 1,800,000 10,450,000
36 Annual Arterial Crack Seal Program
Cap ital Costs 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000
Funding Sources:
Arterial Preservation Funds- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Utility Tax200,000 200,000 200,000 200,000 200,000 200,000 1,200,000
37 Local Streets Improvement Program
Capital Costs 1,942,300 1,457,243 1,470,315 1,483,519 1,496,854 1,510,322 9,360,553
Funding Sources:
Local St Preservation Funds- - - - - - -
Transfer In (Utilities)150,000 150,000 150,000 150,000 150,000 150,000 900,000
Construction Sales Tax1,294,300 1,307,243 1,320,315 1,333,519 1,346,854 1,360,322 7,962,553
57 Arterial Bridge Deck Rehabilitation
Cap ital Costs 250,000 250,000 - - - - 500,000
Funding Sources:
Arterial Preservation Funds- - - - - - -
Grants (Fed, State, Local)- - - - - - -
Utility Tax250,000 250,000 - - - - 500,000
Subtotal, Preservation Projects:
Capital Costs4,243,300 3,607,243 3,420,315 3,433,519 3,546,854 3,560,322 21,811,553
Funding Sources
Unrestricted Street Revenue50,000 50,000 50,000 50,000 50,000 50,000 300,000
Arterial Preservation Funds1,000 - - - - - 1,000
Grants (Fed, State, Local)- - - - - - -
Transfer In (Utilities)150,000 150,000 150,000 150,000 150,000 150,000 900,000
Utility Tax2,250,000 2,100,000 1,900,000 1,900,000 2,000,000 2,000,000 12,150,000
Local St Preservation Funds- - - - - - -
Construction Sales Tax1,294,300 1,307,243 1,320,315 1,333,519 1,346,854 1,360,322 7,962,553
Total Funding3,745,300 3,607,243 3,420,315 3,433,519 3,546,854 3,560,322 21,313,553
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 13
Financial Constraint & Fund Balance Summary
PROJECT FINANCING SUMMARY:201420152016201720182019Total
CAPITAL COSTS
Roadway Projects3,748,658 11,821,370 5,018,590 25,656,250 24,781,520 25,163,490 96,189,878
Int., Signal & ITS Projects976,357 481,000 2,160,600 2,905,200 259,800 259,400 7,042,357
Non-Motorized Projects709,047 525,000 675,000 1,320,000 1,060,000 545,000 4,834,047
Prel. Eng. and Misc. Projects180,000 20,000 20,000 65,000 20,000 - 305,000
Preservation Projects4,243,300 3,607,243 3,420,315 3,433,519 3,546,854 3,560,322 21,811,553
Total Costs 9,857,362 16,454,613 11,294,505 33,379,969 29,668,174 29,528,212 130,182,835
FUNDING SOURCES:
Unrestricted Street Revenue997,900 605,000 775,000 1,727,500 1,597,500 2,326,600 8,029,500
Traffic Impact Fees596,050 1,595,770 1,009,690 3,300,750 3,686,320 2,614,890 12,803,470
Traffic Mitigation Fees50,000 - - - - - 50,000
Local Street Fund 1031,444,300 1,457,243 1,470,315 1,483,519 1,496,854 1,510,322 8,862,553
Arterial Street Fund 1052,251,000 2,100,000 1,900,000 1,900,000 2,000,000 2,000,000 12,151,000
Grants2,945,112 6,971,600 5,914,500 18,983,200 20,662,500 19,726,400 75,203,312
Unrestricted Cap. Imp. Funds50,000 50,000 50,000 50,000 50,000 50,000 300,000
REET2150,000 150,000 150,000 150,000 150,000 150,000 900,000
Other (Agencies)- - - - - - -
Other (Development)850,000 3,500,000 - 5,760,000 - 1,125,000 11,235,000
Other (Muckleshoot)- - - - - - -
PWTF- - - - - - -
Total Funding9,334,362 16,429,61311,269,50533,354,96929,643,17429,503,212 129,534,835
Financial Constraint & Fund Balance Summary
201420152016201720182019
Unrestricted Street Revenue 102
Beginning Fund Balance932,200 469,300 399,300 159,300 (1,033,200) (2,095,700)
Annual Revenue535,000 535,000 535,000 535,000 535,000 535,000
Project Expenses997,900 605,000 775,000 1,727,500 1,597,500 2,326,600
End of Year Fund Balance469,300 399,300 159,300 (1,033,200) (2,095,700) (3,887,300)
Traffic Impact Fees
Beginning Fund Balance2,413,000 2,816,950 2,271,180 2,361,490 210,740 (2,275,580)
Annual Revenue1,000,000 1,050,000 1,100,000 1,150,000 1,200,000 1,250,000
Project Expenses596,050 1,595,770 1,009,690 3,300,750 3,686,320 2,614,890
End of Year Fund Balance2,816,950 2,271,180 2,361,490 210,740 (2,275,580) (3,640,470)
Traffic Mitigation Fees
Beginning Fund Balance83,100 33,100 33,100 33,100 33,100 33,100
Annual Revenue- - - - - -
Project Expenses50,000 - - - - -
End of Year Fund Balance33,100 33,100 33,100 33,100 33,100 33,100
Local Street Fund 103
Beginning Fund Balance498,800 498,800 498,800 498,800 498,800 498,800
Annual Revenue1,444,300 1,457,243 1,470,315 1,483,519 1,496,854 1,510,322
Project Expenses1,444,300 1,457,243 1,470,315 1,483,519 1,496,854 1,510,322
End of Year Fund Balance498,800 498,800 498,800 498,800 498,800 498,800
Arterial Street Fund 105
Beginning Fund Balance1,584,900 1,033,900 633,900 633,900 633,900 633,900
Annual Revenue1,700,000 1,700,000 1,900,000 1,900,000 2,000,000 2,000,000
Project Expenses2,251,000 2,100,000 1,900,000 1,900,000 2,000,000 2,000,000
End of Year Fund Balance1,033,900 633,900 633,900 633,900 633,900 633,900
Grants
Secured Grants2,645,112 3,896,600 - - - -
Unsecured Grants300,000 3,075,000 5,914,500 18,983,200 20,662,500 19,726,400
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary 14
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 15
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: A Street NW - Phase 1 (3rd St NW to 14th St NW) TIP # 1
Project No:c207a0
Project Type:Capacity
Project Manager:Ingrid GaubLOS Corridor ID# 18
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate 2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 258,962 57,514 - - 316,476 316,476
Grants (Fed,State,Local)6,432,212 96,228 - - 6,528,440 6,528,440
Traffic Impact Fees 866,050 25,000 25,000 350,000 916,050 1,541,050
Other Sources (Developer)*371,075 36,485 - - 407,560 407,560
7,928,299 215,227 25,000 350,000 8,168,526 8,793,526
Capital Expenditures:
Design 1,667,209 - 10,000 50,000 1,677,209 1,807,209
Right of Way 1,072,268 - - - 1,072,268 1,072,268
Construction 5,188,822 215,227 15,000 300,000 5,419,049 5,914,049
7,928,299 215,227 25,000 350,000 8,168,526 8,793,526
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees 25,000 25,000 25,000 25,000 475,000 175,000
Other Sources (Developer)*- - - - - -
25,000 25,000 25,000 25,000 475,000 175,000
Capital Expenditures:
Design 10,000 10,000 10,000 10,000 100,000 40,000
Right of Way - - - - - -
Construction 15,000 15,000 15,000 15,000 375,000 135,000
25,000 25,000 25,000 25,000 475,000 175,000
Grants / Other Sources:Other Source is MultiCare Contribution
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Description:
Construct a new multi-lane arterial from 3rd Street NW to 14th Street NW. This project will improve mobility and is tied to corridor
development. It is consistent with the Comprehensive Plan and completes a missing link of a north/south arterial corridor. The project
length is approximately three-quarters of a mile. The City purchased ROW from the northern property owner. If the property develops,
some or a portion of those funds may be reimbursed to the City (total cost was $251,000).
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,830.
Budget Amendments
Adjusted Budget
Total Funding Sources:
Adopted Budget
Progress Summary:
Pre-design was completed prior to 2007. Final design and environmental permitting were completed in 2011. Construction was completed
in 2012. Wetland monitoring is required to continue until 2023.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 16
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way South Pedestrian Improvements (Dogwood St SE to Fir St SE)TIP # 2
Project No:cp1118
Project Type:Non-Motorized
Project Manager:Leah DunsdonLOS Corridor ID# 4
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 1,624 213,376 1,000 - 216,000 216,000
Grants (Fed,State,Local)116,900 723,930 - - 840,830 840,830
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
118,524 937,3061,000 - 1,056,830 1,056,830
Capital Expenditures:
Design 118,524 113,476 1,000 - 233,000 233,000
Right of Way - 10,000 - - 10,000 10,000
Construction - 813,830 - - 813,830 813,830
118,524 937,3061,000 - 1,056,830 1,056,830
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will construct pedestrian improvements along Auburn Way South between Dogwood Street SE and Fir Street SE that are
consistent with WSDOT's SR-164 Route Development Plan. The project includes sidewalk improvements, access management, a mid-
block pedestrian crossing, construction of a U-turn wedge for eastbound vehicles at Fir Street SE and street lighting.
Progress Summary:
Project design began in 2012 with construction expected to begin during 2013. The City was awarded $100,000 in federal funding and
$740,830 in state funding in May 2011.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 17
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way Corridor (4th St NE to 4th St SE) TIP # 3
Project No:c409a0
Project Type:Non-Capacity
Project Manager:TBD LOS Corridor ID# 2, 3
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 78,251 - - - 78,251 788,251
Grants (Fed,State,Local)- - - - - 3,108,700
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
78,251 - - - 78,251 3,896,951
Capital Expenditures:
Design 78,251 - - - 78,251 696,951
Right of Way - - - - - 200,000
Construction - - - - - 3,000,000
78,251 - - - 78,251 3,896,951
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - 110,000 - 600,000 710,000 -
Grants (Fed,State,Local)- 708,700 - 2,400,000 3,108,700 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- 818,700 - 3,000,000 3,818,700 -
Capital Expenditures:
Design - 618,700 - - 618,700 -
Right of Way - 200,000 - - 200,000 -
Construction - - - 3,000,000 3,000,000 -
- 818,700 - 3,000,000 3,818,700 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
This project is based on a pre-design study to improve pedestrian accessibility, appearance, and link the downtown area along Auburn
Way South between 4th Street NE and 4th Street SE. The project may include some pavement repairs. However, an overlay was
completed as part of the City's Arterial Pavement Preservation Program in 2007. Although this was considered a temporary fix, the scope
has been modified to account for the pavement work. The project is approximately 0.5 miles long.
Progress Summary:
The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 18
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: I Street NE Corridor (45th St NE to S 277th St) TIP # 4
Project No:c415a0
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 21
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 161,827 - - - 161,827 161,827
Grants (Fed,State,Local)- - - - - 1,000,000
Traffic Impact Fees - - - - - -
Other Sources (Development)- - - - - 5,760,000
Other (*Port of Seattle)- - - - - -
161,827 - - - 161,827 6,921,827
Capital Expenditures:
Design 36,827 - - - 36,827 460,000
Right of Way - - - - - 1,020,000
Construction 125,000 - - - 125,000 5,280,000
161,827 - - - 161,827 6,921,827
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 161,827 -
Grants (Fed,State,Local)- 1,000,000 - - 1,000,000 -
Traffic Impact Fees - - - - - -
Other Sources (Development)- 5,760,000 - - 5,760,000 -
Other (Port of Seattle)- - - - - -
- 6,760,000- - 6,921,827
Capital Expenditures:
Design - 460,000 - - 496,827 -
Right of Way - 1,020,000 - - 1,020,000 -
Construction - 5,280,000 - - 5,405,000 -
- 6,760,000- - 6,921,827 -
Grants / Other Sources:
Description:
The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan Environmental Impact
Study. A portion of the ROW and Construction will be developer funded. The cross section will likely be a 5-lane arterial per the city's
Comprehensive Plan.
Progress Summary:
This project is development driven. Prior expenditures were for design and construction of culvert crossing.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,200.
Total Expenditures:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 19
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Special Revenue Fund
Project Title: M Street Underpass (3rd St SE to 8th St SE) TIP # 5
Project No:c201a0
Project Type:Capacity
Project Manager:Ryan VondrakLOS Corridor ID# 6
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 150,000 330,716 - - 480,716 480,716
Grants (Fed,State,Local)7,818,102 1,674,779 - - 9,492,881 9,492,881
REET2 1,140,000 - - - 1,140,000 1,140,000
Traffic Impact Fees (Construction)4,175,844 - - - 4,175,844 4,175,844
Traffic Impact Fees (Debt Service)- 38,640 109,550 109,070 148,190 2,972,050
Traffic Mitigation Fees 660,000 - - - 660,000 660,000
PWTFL (30 years)- 3,336,170 - - 3,336,170 3,336,170
Other Sources (Other Agencies)*2,233,070 921,708 - - 3,154,778 3,154,778
16,177,016 6,302,013 109,550 109,070 22,588,579 22,440,389
Debt Service:
2,972,050
Capital Expenditures:
Design 2,688,924 - - - 2,688,924 2,688,924
Right of Way 3,358,443 - - - 3,358,443 3,358,443
Construction 10,129,649 6,263,373 - - 16,393,022 16,393,022
PWTFL Debt Service - 38,640 109,550 109,070 148,190 2,972,050
16,177,016 6,302,013 109,550 109,070 22,588,579 22,440,389
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET2 - - - - - -
Traffic Impact Fees (Construction)- - - - - -
Traffic Impact Fees (Debt Service)108,590 107,550 106,520 105,490 646,770 2,286,640
Traffic Mitigation Fees - - - - - -
PWTFL (30 years)- - - - - -
Other Sources (Other Agencies)*- - - - - -
108,590 107,550 106,520 105,490 646,770 2,286,640
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction - - - - - -
PWTFL Debt Service 108,590 107,550 106,520 105,490 646,770 2,286,640
108,590 107,550 106,520 105,490 646,770 2,286,640
Total Funding Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Grants / Other Sources: Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway
Adopted Budget
Budget Amendments
Adjusted Budget
Description:
Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks.
Progress Summary:
100% Design Drawings and right of way acquisition were completed in 2011. Construction started in early 2012 and is scheduled to be
complete during 2014.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $21,827.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 20
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: TIP # 6
Project No:c222a0
Project Type:Capacity
Project Manager:Ryan VondrakLOS Corridor ID# 15
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013 Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 24,825 382,825 - - 407,650 407,650
Grants (Fed,State,Local)- 850,400 153,000 3,896,600 1,003,400 4,900,000
Traffic Impact Fees - - - 290,700 - 290,700
Other (Development Funds)*- - - 1,000,000 - 1,000,000
Other - - - - - -
24,825 1,233,225153,000 5,187,300 1,411,050 6,598,350
Capital Expenditures:
Design 24,825 1,215,925 153,000 - 1,393,750 1,393,750
Right of Way - 17,300 - - 17,300 17,300
Construction - - - 5,187,300 - 5,187,300
24,825 1,233,225 153,000 5,187,300 1,411,050 6,598,350
TotalEx penditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - 4,049,600 -
Traffic Impact Fees - - - - 290,700 -
Other (Development Funds)*- - - - 1,000,000 -
Other - - - - - -
- - - - 5,340,300 -
Capital Expenditures:
Design - - - - 153,000 -
Right of Way - - - - - -
Construction - - - - 5,187,300 -
- - - - 5,340,300 -
Grants / Other Sources:
Description:
This project includes preliminary engineering, design, right of way acquisition and construction of major widening on S 277th Street,
including the addition of three lanes, one westbound and two eastbound, a Class 1 trail, and storm improvements. The project extends
from Auburn Way North to L Street NE, approximately 0.9 miles.
Progress Summary:
Staff is coordinating with the City of Kent and King County to complete annexation of the roadway into the City of Auburn. Robertson
Properties Group is participating in this project and is dedicating all necessary roadway frontage to the City.
Future Impact on Operating Budget:
The annual maintenance costs for this project is estimated to be $27,250.
S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements
Total Expenditures:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 21
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 15th Street SW Reconstruction TIP # 7
Project No:cpxxxx
Project Type:Non-Capacity
Project Manager:TBD LOS Corridor ID# 12
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 575,000
Grants (Fed,State,Local)- - - - - 2,800,000
REET - - - - - -
Traffic Mitigation Funds - - - - -
Other - - - - - -
- - - - - 3,375,000
Capital Expenditures:
Design - - - - - 375,000
Right of Way - - - - - -
Construction - - - - - 3,000,000
- - - - - 3,375,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue 75,000 500,000 - - 575,000 -
Grants (Fed,State,Local)300,000 2,500,000 - - 2,800,000 -
REET - - - - - -
Traffic Mitigation Funds - - - -
Other - - - - - -
375,000 3,000,000- - 3,375,000 -
Capital Expenditures:
Design 375,000 - - - 375,000 -
Right of Way - - - - - -
Construction - 3,000,000 - - 3,000,000 -
375,000 3,000,000- - 3,375,000 -
Grants / Other Sources:
Total Funding Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Bud get
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Description:
This project will evaluate improvements to the Union Pacific at grade rail crossings as well as the vertical sight distance to the Interurban
Trail crossing to the west of the tracks. This project was originally scoped to include pavement preservation. The pavement preservation
component could still be combined with this project, but is also eligible for the Arterial Pavement Preservation Program. A planning level
cost estimate is provided.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 22
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: A Street NW, Phase 2 (W Main St to 3rd St NW) TIP # 8
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 18
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - 150,000 - 150,000
Grants (Fed,State,Local)- - - - - 3,000,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other (Developer)*150,000 - - - 150,000 150,000
150,000 - - 150,000 150,000 3,300,000
Capital Expenditures:
Design - - - 150,000 - 400,000
Right of Way - - - - - 250,000
Construction 150,000 - - - 150,000 2,650,000
150,000 - - 150,000 150,000 3,300,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 150,000 -
Grants (Fed,State,Local)- 3,000,000 - - 3,000,000 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other (Developer)*- - - - - -
- 3,000,000 - - 3,150,000 -
Capital Expenditures:
Design - 250,000 - - 400,000 -
Right of Way - 250,000 - - 250,000 -
Construction - 2,500,000 - - 2,500,000 -
- 3,000,000- - 3,150,000 -
Grants / Other Sources:
Budget Amendments
Description:
Construct a multi-lane arterial from W Main St to 3rd St NW. This project will connect A St NW, Phase 1 to the Sound Transit Station and
the Central Business District. This project could be partially or fully funded by developers. The project is approximately 0.2 miles long.
Progress Summary:
The parking garage constructed by the Auburn Regional Medical Center completed a portion of this project in 2009. Design of A Street is
anticipated to begin in 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Bud get
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 23
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: D Street NW (37th St NW to 44th St NW) TIP # 9
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 20
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 5,250,000
REET - - - - - -
Traffic Impact Fees - - - - - 1,050,000
Other - - - - - -
- - - - - 6,300,000
Capital Expenditures:
Design - - - - - 1,050,000
Right of Way - - - - - 1,750,000
Construction - - - - - 3,500,000
- - - - - 6,300,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 250,000 - 5,000,000 5,250,000 -
REET - - - - - -
Traffic Impact Fees - 50,000 - 1,000,000 1,050,000 -
Other - - - - - -
- 300,000- 6,000,000 6,300,000 -
Capital Expenditures:
Design - 300,000 - 750,000 1,050,000 -
Right of Way - - - 1,750,000 1,750,000 -
Construction - - - 3,500,000 3,500,000 -
- 300,000- 6,000,000 6,300,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
Construct a new four-lane arterial per the city Comprehensive Plan. This project is tied to potential future development and will complete
the missing link of a major north/south arterial corridor between S 277th St to the north and Ellingson Road SW (41st Street SE) to the
south. The new corridor will improve north/south mobility through the City. The D St NW project is approximately 0.42 miles in length.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $11,450.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 24
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: F Street SE (4th St SE to Auburn Way S) TIP # 10
Project No:cp0911
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - 200,000 - 200,000 2,200,000
REET - - - - - -
Traffic Impact Fees 7,620 - 50,000 - 57,620 307,620
Other - - - - - -
7,620 - 250,000 - 257,620 2,507,620
Capital Expenditures:
Design 7,620 - 250,000 - 257,620 257,620
Right of Way - - - - - 75,000
Construction - - - - - 2,175,000
7,620 - 250,000 - 257,620 2,507,620
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)2,000,000 - - - 2,200,000 -
REET - - - - - -
Traffic Impact Fees 250,000 - - - 300,000 -
Other - - - - - -
2,250,000 - - - 2,500,000 -
Capital Expenditures:
Design - - - 250,000 -
Right of Way 75,000 - - - 75,000 -
Construction 2,175,000 - - - 2,175,000 -
2,250,000 - - - 2,500,000 -
Grants / Other Sources:
Total Funding Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Budget
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Description:
The F St SE project includes pavement reconstruction, installation of curbs, gutters, an 8-foot wide sidewalk on both sides, parking on one
side, and a center turn-lane, as well as crash attenuation at the supports for the BNSF railroad bridge. This project improves mobility and
safety along the corridor. The project is approximately 0.3 miles long.
Progress Summary:
Preliminary design and survey work was completed in 2009. Final design and construction are planned to be completed following
construction of the M Street grade separation project during 2013.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $4,100.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 25
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: M Street NE (E Main St to 4th St NE) TIP # 11
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 5
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - 225,000 - 1,225,000
REET - - - - - -
Traffic Impact Fees - - 50,000 50,000 50,000 250,000
Other - - - - - -
- - 50,000 275,000 50,000 1,475,000
Capital Expenditures:
Design - - 50,000 75,000 50,000 125,000
Right of Way - - - 200,000 - 200,000
Construction - - - - - 1,150,000
- - 50,000 275,000 50,000 1,475,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)1,000,000 - - - 1,225,000 -
REET - - - - - -
Traffic Impact Fees 150,000 - - - 250,000 -
Other - - - - - -
1,150,000 - - - 1,475,000 -
Capital Expenditures:
Design - - - - 125,000 -
Right of Way - - - - 200,000 -
Construction 1,150,000 - - 1,150,000 -
1,150,000 - - - 1,475,000 -
Grants / Other Sources:
Budget Amendments
Description:
This project will construct a complete four-lane street section on M St NE between south of E Main St and 4th St NE.
Progress Summary:
Pre-design will be complete during 2014 to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,500.
Adopted Budget
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 26
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Grade-Separated Crossing of BNSF Railyard TIP # 12
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - 32,125,000
- - - - - 32,125,000
Capital Expenditures:
Design - - - - - 3,625,000
Right of Way - - - - - 4,000,000
Construction - - - - - 24,500,000
- - - - - 32,125,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other (Developer)- - - 1,125,000 1,125,000 31,000,000
- - - 1,125,000 1,125,000 31,000,000
Capital Expenditures:
Design - - - 1,125,000 1,125,000 2,500,000
Right of Way - - - - - 4,000,000
Construction - - - - - 24,500,000
- - - 1,125,000 1,125,000 31,000,000
Grants / Other Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Budget
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Description:
This project will grade-separate the crossing of the BNSF Railyard, either from SR-18 to 6th Street SE or from 15th Street SW to A Street
SE. The first alternative would realign the SR-18 eastbound ramp, grade separate the main north/south line and the Stampede Pass line,
and connect to 6th Street SE. The second alternative would provide a new corridor from 15th Street SW to A Street SE in the vicinity of
12th Street SE and 17th Street SE, either via an overpass or underpass of the BNSF Railyard. This new east/west connection will improve
access and circulatoin associated with the potential redevelopment of the BNSF yard as an intermodal freight facility.
Progress Summary:
Future Impact on Operating Budget:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 27
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 8th Street NE Widening (Pike St NE to R St NE)TIP # 15
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - 360,000 - 1,160,000
REET - - - - - -
Traffic Impact Fees - - - 90,000 - 290,000
Other - - - - - -
- - - 450,000 - 1,450,000
Capital Expenditures:
Design - - - 200,000 - 200,000
Right of Way - - - 250,000 - 250,000
Construction - - - - - 1,000,000
- - - 450,000 - 1,450,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)800,000 - - - 1,160,000 -
REET - - - - - -
Traffic Impact Fees 200,000 - - - 290,000 -
Other - - - - - -
1,000,000 - - - 1,450,000 -
Capital Expenditures:
Design - - - - 200,000 -
Right of Way - - - - 250,000 -
Construction 1,000,000 - - - 1,000,000 -
1,000,000 - - - 1,450,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
Widen 8th Street NE to extend the five-lane cross-section which currently exists to the west of Pike St NE to R St NE by providing an
additional travel lane along the south side of the roadway. This is a planning level cost estimate.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 28
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 49th Street NE (Auburn Way North to I St NE)TIP # 16
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 29
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Funds - - - - - -
Other (Development)*- - 850,000 2,500,000 850,000 3,350,000
- - 850,000 2,500,000 850,000 3,350,000
Capital Expenditures:
Design - - 250,000 - 250,000 250,000
Right of Way - - 600,000 - 600,000 600,000
Construction - - - 2,500,000 - 2,500,000
- - 850,000 2,500,000 850,000 3,350,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Funds - - - - - -
Other (Development)*- - - - 3,350,000 -
- - - - 3,350,000 -
Capital Expenditures:
Design - - - - 250,000 -
Right of Way - - - - 600,000 -
Construction - - - - 2,500,000 -
- - - - 3,350,000 -
Grants / Other Sources:
Budget Amendments
Ad justed Bud get
Adopted Budget
Description:
Construct a new east/west corridor from Auburn Way North to I St NE. The existing 49th Street corridor extends B St NW to the west. This
project also includes a traffic signal at the intersection of Auburn Way North and 49th Street. This roadway was evaluated and
recommended in the NE Special Planning Area. It is anticipated that this will be constructed by future development. It is approximately
0.75 miles long.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $27,050.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 29
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Citywide Guardrail ImprovementsTIP # 25
Project No:cp0912
Project Type:Safety (Non-Capacity)
Project Manager:Jacob SweetingLOS Corridor ID# 36
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 1,000 - 51,000 51,000
Grants (Fed,State,Local)- 502,275 - - 502,275 502,275
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- 552,275 1,000 - 553,275 553,275
Capital Expenditures:
Design - 50,000 1,000 - 51,000 51,000
Right of Way - - - - - -
Construction - 502,275 - - 502,275 502,275
- 552,275 1,000 - 553,275 553,275
TotalExpenditures
2016 2017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
The project will install guardrail along the Green River Road SE, R Street SE/Kersey Way SE, and Mountainview Drive SW corridors.
Progress Summary:
Grant funding for construction was awarded February 1st with no local match requirement. The project will be designed and constructed
during 2013.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 30
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: BNSF 3rd Rail Expansion Roadway ImprovementsTIP # 33
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 13, 18
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 25,000 - 25,000 25,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - 25,000 - 25,000 25,000
Capital Expenditures:
Design - - 5,000 - 5,000 5,000
Right of Way - - - - - -
Construction - - 20,000 - 20,000 20,000
- - 25,000 - 25,000 25,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 25,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - 25,000 -
Capital Expenditures:
Design - - - - 5,000 -
Right of Way - - - - - -
Construction - - - - 20,000 -
- - - - 25,000 -
Grants / Other Sources:
Description:
This project will design and construct roadway improvements associated with the construction of the 3rd rail line by BNSF.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 31
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 124th Ave SE Corridor Improvements - Phase 2TIP # 39
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 23, 25
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 735,000
Traffic Impact Fees - - - - - 115,000
Other - - - - - -
- - - - - 850,000
Capital Expenditures:
Design - - - - - 100,000
Right of Way - - - - - 50,000
Construction - - - - - 700,000
- - - - - 850,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 85,000 650,000 - 735,000 -
Traffic Impact Fees - 15,000 100,000 - 115,000 -
Other - - - - - -
- 100,000 750,000 - 850,000 -
Capital Expenditures:
Design - 100,000 - - 100,000 -
Right of Way - - 50,000 - 50,000 -
Construction - - 700,000 - 700,000 -
- 100,000750,000 - 850,000 -
Grants / Other Sources:
Description:
This project will fund the design, right-of-way acquisition, and construction of improvements to the signalized SE 320th St and 124th Ave
SE intersection. Improvements include constructing bike lanes, sidewalks, dual southbound left-turn lanes into GRCC, and ITS
improvements. The intersection is located at the main entrance to Green River Community College and will require additional on-site
improvements to be constructed by GRCC.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 32
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 124th Ave SE Corridor Improvements - Phase 1TIP # 40
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 23
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - 2,200,000 - 2,200,000
Traffic Impact Fees - - 200,000 550,000 200,000 750,000
Other - - - - - -
- - 200,000 2,750,000 200,000 2,950,000
Capital Expenditures:
Design - - 200,000 - 200,000 200,000
Right of Way - - - 250,000 - 250,000
Construction - - - 2,500,000 - 2,500,000
- - 200,000 2,750,000 200,000 2,950,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - 2,200,000 -
Traffic Impact Fees - - - - 750,000 -
Other - - - - - -
- - - - 2,950,000 -
Capital Expenditures:
Design - - - - 200,000 -
Right of Way - - - - 250,000 -
Construction - - - - 2,500,000 -
- - - - 2,950,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will fund the design, right-of-way acquisition, and construction of a four-lane section with bicycle and pedestrian facilities on
124th Ave SE between SE 318th St and SE 312th St, and improvements to the signalized intersection of SE 312th St and 124th Ave SE
(including adding bike lanes, dual westbound left-turn lanes, dual southbound through-lanes, a northbound right-turn pocket, ITS
improvements, and pedestrian safety improvements).
Progress Summary:
Design is planned for 2014.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 33
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: R Street Bypass (M Street SE to SR-18)TIP # 41
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 1,221,600
Grants (Fed,State,Local)- - - - - 4,886,400
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - - 6,108,000
Capital Expenditures:
Design - - - - - 408,000
Right of Way - - - - - 1,800,000
Construction - - - - - 3,900,000
- - - - - 6,108,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - 81,600 81,600 1,140,000
Grants (Fed,State,Local)- - - 326,400 326,400 4,560,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - 408,000 408,000 5,700,000
Capital Expenditures:
Design - - - 408,000 408,000 -
Right of Way - - - - - 1,800,000
Construction - - - - - 3,900,000
- - - 408,000 408,000 5,700,000
Grants / Other Sources:
Description:
This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and Auburn Black
Diamond Road, paralleling the rail line. The project will provide an arterial connection from the newly constructed M Street Underpass to
the Auburn Black Diamond Road interchange with SR-18 to keep both vehicular and freight traffic out of residential neighborhoods along R
Street SE north of the Stampede Pass line. The arterial connection may also provide opportunities for partnering with the Muckleshoot
Indian Tribe as they redevelop the Miles Pit area and as more definitive plans are developed for a potential new WSDOT interchange on
SR-18 in the vicinity of the project.
Progress Summary:
Future Impact on Operating Budget:
Adopted Budget
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 34
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: SE 320th Street Corridor ImprovementsTIP # 42
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 25
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 549,500
Traffic Impact Fees - - - 50,000 - 140,500
PWTFL - - - - - -
Other - - - - - -
- - - 50,000 - 690,000
Capital Expenditures:
Design - - - 50,000 - 110,000
Right of Way - - - - - 60,000
Construction - - - - - 520,000
- - - 50,000 - 690,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)47,500 502,000 - - 549,500 -
Traffic Impact Fees 12,500 78,000 - - 140,500 -
PWTFL - - - - - -
Other - - - - - -
60,000 580,000- - 690,000 -
Capital Expenditures:
Design 60,000 - - - 110,000 -
Right of Way - 60,000 - - 60,000 -
Construction - 520,000 - - 520,000 -
60,000 580,000- - 690,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will fund the design, right-of-way acquisition, and construction of a three-lane roadway with bicycle and pedestrian facilities
on SE 320th St between 124th Ave SE and the western entrance to GRCC.
Progress Summary:
GRCC is planning to complete the design and construction for the segment between 124th Ave SE and 122nd Ave SE in 2013.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 35
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way South (SR-164) Corridor Safety ImprovementsTIP # 43
Project No:cp1218 STIP# AUB-44
Project Type:Capacity
Project Manager:Leah DunsdonLOS Corridor ID# 4
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 2,684 - - - 2,684 2,684
Grants (Fed,State,Local)2,738 247,262 2,083,108 - 2,333,108 2,333,108
Traffic Impact Fees - - - - - -
PWTFL - - - - - -
Other - - - - - -
5,422 247,2622,083,108 - 2,335,792 2,335,792
Capital Expenditures:
Design 5,422 239,762 93,000 - 338,184 338,184
Right of Way - 7,500 62,084 - 69,584 69,584
Construction - - 1,928,024 - 1,928,024 1,928,024
5,422 247,2622,083,108 - 2,335,792 2,335,792
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - 2,083,108 -
Traffic Impact Fees - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - - 2,083,108 -
Capital Expenditures:
Design - - - - 93,000 -
Right of Way - - - - 62,084 -
Construction - - - - 1,928,024 -
- - - - 2,083,108 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will improve access management, including u-turns, upgrade transit stops and street lighting, widen to accomodate turn-
lanes and pedestrian and bicycle facilities, upgrade pavement markings, install pedestrian signals and audible pedestrian push buttons,
and upgrade traffic signals to change the phasing and to improve the visibility of the signal heads.
Progress Summary:
Grant funding was awarded in 2012 and does not require a local match.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 36
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: W Main Street ImprovementsTIP # 55
Project No:cpxxxx
Project Type:Non-Capacity
Project Manager:TBD LOS Corridor ID# 11
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 730,000
Grants (Fed,State,Local)- - - - - 2,760,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - - 3,490,000
Capital Expenditures:
Design - - - - - 640,000
Right of Way - - - - - -
Construction - - - - - 2,850,000
- - - - - 3,490,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - 160,000 570,000 - 730,000 -
Grants (Fed,State,Local)- 480,000 2,280,000 - 2,760,000 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- 640,000 2,850,000 - 3,490,000 -
Capital Expenditures:
Design - 640,000 - - 640,000 -
Right of Way - - - - - -
Construction - - 2,850,000 - 2,850,000 -
- 640,000 2,850,000 - 3,490,000 -
Grants / Other Sources:
Description:
This project will reconstruct the section of W Main Street between the Interurban Trail to the east and W Valley Highway to the west. The
project will convert the existing four-lane section to a three-lane section with one travel lane in each direction, a two-way center left-turn
lane, and bike lanes. The improvements also include street lighting, streetscape, pedestrian, and ITS improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 37
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way S Corridor Improvements (Fir St SE to Hemlock St SE)TIP # 58
Project No:cp1119 STIP# AUB-38
Project Type:Capacit y
Project Manager:Leah DunsdonLOS Corridor ID# 4
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 849 - 1,000 - 1,849 1,849
Grants (State)161,286 2,265,114 - - 2,426,400 2,426,400
Traffic Impact Fees - - - - - -
Other Sources (Muckleshoot)40,323 566,278 - - 606,601 606,601
202,458 2,831,392 1,000 - 3,034,850 3,034,850
Capital Expenditures:
Design 202,458 189,365 1,000 - 392,823 392,823
Right of Way - 224,150 - - 224,150 224,150
Construction - 2,417,877 - - 2,417,877 2,417,877
202,458 2,831,392 1,000 - 3,034,850 3,034,850
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (State)- - - - - -
Traffic Impact Fees - - - - - -
Other Sources (Muckleshoot)- - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Description:
This project will widen Auburn Way South between Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalks, illumination and
storm improvements. A new traffic signal will be constructed at Hemlock Street SE and connect to Auburn's Intelligent Transportation
System.
Progress Summary:
Washington State Transportation Improvement Board (TIB) awarded the City grant funds in the amount of $2,426,400 on November 19,
2010.
Future Impact on Operating Budget:
This annual maintenance cost for this project is estimated to be $9,300.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 38
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: M Street SE Corridor (8th St SE to AWS)TIP # 60
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 6
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE 2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 500,000
Grants (Fed,State,Local)- - - - - 4,675,000
Traffic Impact Fees - - - - - 1,500,000
REET2 - - - - - -
Other - - - - - -
- - - - - 6,675,000
Capital Expenditures:
Design - - - - - 650,000
Right of Way - - - - - 1,275,000
Construction - - - - - 4,750,000
- - - - - 6,675,000
TotalExpenditures
20162017201 8 20192014-2019Beyond 201 9
Fundin g Sources:
Unrestricted Street Revenue - 250,000 250,000 - 500,000 -
Grants (Fed,State,Local)- 925,000 3,750,000 - 4,675,000 -
Traffic Impact Fees - 750,000 750,000 - 1,500,000 -
REET2 - - - - - -
Other - - - - - -
- 1,925,000 4,750,000 - 6,675,000 -
Capital Expenditures:
Design - 650,000 - - 650,000 -
Right of Way - 1,275,000 - - 1,275,000 -
Construction - - 4,750,000 - 4,750,000 -
- 1,925,000 4,750,000 - 6,675,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
Widen M Street SE into a multi-lane arterial between 8th St SE and AWS. This project will improve mobility and is tied to corridor
development. It is consistent with the Comprehensive Plan and contributes to the completion of a north/south arterial corridor.
Progress Summary:
Future Impact on Operating Budget:
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 39
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way South Bypass - Riverwalk Dr to SR-18 at R St SETIP # 61
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 12,090,000
Grants (Fed,State,Local)- - - - - 48,360,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - - 60,450,000
Capital Expenditures:
Design - - - - - 6,000,000
Right of Way - - - - - 6,000,000
Construction - - - - - 48,450,000
- - - - - 60,450,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - 1,200,000 1,200,000 10,890,000
Grants (Fed,State,Local)- - - 4,800,000 4,800,000 43,560,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - 6,000,000 6,000,000 54,450,000
Capital Expenditures:
Design - - - 6,000,000 6,000,000 -
Right of Way - - - - - 6,000,000
Construction - - - - - 48,450,000
- - - 6,000,000 6,000,000 54,450,000
Grants / Other Sources:
Description:
This project will construct a new roadway corridor to bypass Auburn Way South. The new roadway will extend from Riverwalk Drive to R
Street SE to the north of SR-18. A new connection to a new interchange with SR-18.
Progress Summary:
Future Impact on Operating Budget:
Adopted Budget
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 40
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: AWS Streetscape Improvements (SR-18 to M St SE)TIP # 62
Project No:cpxxxx
Project Type:Miscellaneous
Project Manager:TBD LOS Corridor ID# 3
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 400,000
Grants (Fed,State,Local)- - - - - 4,350,000
Traffic Impact Fees - - - - - -
REET2 - - - - - -
Other - - - - - -
- - - - - 4,750,000
Capital Expenditures:
Design - - - - - 500,000
Right of Way - - - - - 1,450,000
Construction - - - - - 2,800,000
- - - - - 4,750,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - 200,000 200,000 - 400,000 -
Grants (Fed,State,Local)- 1,750,000 2,600,000 - 4,350,000 -
Traffic Impact Fees - - - - - -
REET2 - - - - - -
Other - - - - - -
- 1,950,000 2,800,000 - 4,750,000 -
Capital Expenditures:
Design - 500,000 - - 500,000 -
Right of Way - 1,450,000 - - 1,450,000 -
Construction - - 2,800,000 - 2,800,000 -
- 1,950,0002,800,000 - 4,750,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Bud get
Description:
This project will revitalize and beautify AWS from the SR-18 interchange to the intersection with M Street SE. Proposed improvements
include: enhancement of crosswalks and pedestrian linkages; new and repaired sidewalks; curb and gutter; pedestrian ramps; new
landscaped medians; street trees; new lighting; pedestrian benches; trash receptacles; recycling containers and other appropriate
amenities. A significant portion of project costs are associated with right-of-way acquisition.
Progress Summary:
Future Impact on Operating Budget:
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 41
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Lea Hill Rd Segment 1 (R St NE to 105th Pl SE) TIP # 64
Project No:cpxxxx
Project Type:Capacit y
Project Manager:TBD LOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
-
-
- - - -
Activity:
(Previous Yrs)2013 YE 2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 10,000,000
Traffic Impact Fees - - - - - 2,500,000
Other - - - - - -
- - - - - 12,500,000
Capital Expenditures:
Design - - - - - 2,000,000
Right of Way - - - - - 500,000
Construction - - - - - 10,000,000
- - - - - 12,500,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - -
Grants (Fed,State,Local)50,000 1,950,000 8,000,000 - 10,000,000 -
Traffic Impact Fees - 500,000 2,000,000 - 2,500,000 -
Other - - - - - -
50,000 2,450,000 10,000,000 - 12,500,000 -
Capital Expenditures:
Design 50,000 1,950,000 - - 2,000,000 -
Right of Way - 500,000 - - 500,000 -
Construction - - 10,000,000 - 10,000,000 -
50,000 2,450,000 10,000,000 - 12,500,000 -
Grants / Other Sources:
Budg et Amendments
Adopted Budget
Description:
Widen the existing roadway to provide a four-lane cross section pedestiran and bicycle facilities. The project includes widening the Green
River Bridge.
Progress Summary:
Future Impact on Operating Budget:
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 42
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Lea Hill Rd Segment 2 (105th Pl SE to 112th Ave SE) TIP # 65
Project No:cpxxxx
Project Type:Capacit y
Project Manager:TBD LOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
-
-
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 10,000,000
Traffic Impact Fees - - - - - 2,000,000
Other - - - - - -
- - - - - 12,000,000
Capital Expenditures:
Design - - - - - 2,000,000
Right of Way - - - - - 1,500,000
Construction - - - - - 8,500,000
- - - - - 12,000,000
TotalExpenditure s
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - 2,900,000 7,100,000 10,000,000 -
Traffic Impact Fees - - 600,000 1,400,000 2,000,000 -
Other - - - - - -
- - 3,500,000 8,500,000 12,000,000 -
Capital Expenditures:
Design - - 2,000,000 - 2,000,000 -
Right of Way - - 1,500,000 - 1,500,000 -
Construction - - - 8,500,000 8,500,000 -
- - 3,500,000 8,500,000 12,000,000 -
Grants / Other Sources:
Budget Amendments
Adopted Bud get
Description:
Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities.
Progress Summary:
Future Impact on Operating Budget:
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 43
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE ) TIP # 66
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
-
-
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 3,000,000
Traffic Impact Fees - - - - - 1,000,000
Other - - - - - -
- - - - - 4,000,000
Capital Expenditures:
Design - - - - - 500,000
Right of Way - - - - - 500,000
Construction - - - - - 3,000,000
- - - - - 4,000,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 3,000,000 - - 3,000,000 -
Traffic Impact Fees - 1,000,000 - - 1,000,000 -
Other - - - - - -
- 4,000,000- - 4,000,000 -
Capital Expenditures:
Design - 500,000 - - 500,000 -
Right of Way - 500,000 - - 500,000 -
Construction - 3,000,000 - - 3,000,000 -
- 4,000,000 - - 4,000,000 -
Grants / Other Sources:
Budget Amendments
Adopted Bud get
Description:
Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities.
Progress Summary:
Future Impact on Operating Budget:
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Improvement Projects 44
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 45
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: M Street SE/12th Street SE Traffic SignalTIP # 14
Project No:cpxxxx
Project Type:Intersection Improvement, Capacity
Project Manager:TBD LOS Corridor ID# 11
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 500,000
REET 2 - - - - - -
Traffic Impact Fees - - - - - 125,000
Other - - - - - -
- - - - - 625,000
Capital Expenditures:
Design - - - - - 75,000
Right of Way - - - - - 50,000
Construction - - - - - 500,000
- - - - - 625,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 500,000 - - 500,000 -
REET 2 - - - - - -
Traffic Impact Fees - 125,000 - - 125,000 -
Other - - - - - -
- 625,000 - - 625,000 -
Capital Expenditures:
Design - 75,000 - - 75,000 -
Right of Way - 50,000 - - 50,000 -
Construction - 500,000 - - 500,000 -
- 625,000 - - 625,000 -
Grants / Other Sources:
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
This project includes the design, right of way acquisistion and construction of a new traffic signal.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Adopted Budget
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 46
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Harvey Rd NE/8th St NE Intersection ImprovementsTIP # 17
Project No:cp0611
Project Type:Capacity
Project Manager:None LOS Corridor ID# 5,19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees (Debt Service)262,100 86,900 86,500 86,000 435,500 1,603,100
Traffic Impact Fees 204,500 - - - 204,500 204,500
PWTF 1,527,300 - - - 1,527,300 1,527,300
1,993,900 86,900 86,500 86,000 2,167,300 1,731,800
Debt Service:
1,603,100
Capital Expenditures:
Design 327,500 - - - 327,500 327,500
Right of Way 200,400 - - - 200,400 200,400
Construction 1,203,900 - - - 1,203,900 1,203,900
Long Term Debt - PWTF 262,100 86,900 86,500 86,000 435,500 1,603,100
1,993,900 86,900 86,500 86,000 2,167,300 1,731,800
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees (Debt Service)85,600 85,200 84,800 84,400 512,500 741,600
Traffic Impact Fees - - - - - -
PWTF - - - - - -
85,600 85,200 84,800 84,400 512,500 741,600
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction - - - - - -
Long Term Debt - PWTF 85,600 85,200 84,800 84,400 512,500 741,600
85,600 85,200 84,800 84,400 512,500 741,600
Grants / Other Sources:
Adopted Budget
Total Funding Sources:
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Total Expenditures:
Forecasted Project Cost:
Budget Amendments
Description:
Add one eastbound through/right turn-lane on 8th St NE to the west of Harvey Rd. Modify traffic signals and traffic channelization to
accommodate the new lane. The additional lane will reduce traffic delays and queuing at the intersection of Harvey Rd and 8th St NE in
all directions. This project will reconstruct M St NE from 4th St NE to 8th St NE, a segment of roadway approximately 0.3 miles long with
a four-lane cross-section. The reconstruction will address the existing poor pavement condition and fill in any gaps in the sidewalk
network.
Progress Summary:
Project was completed in 2010. Ongoing budget is for PWTFL debt payments.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 47
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 8th St NE/104th Ave SE Intersection ImprovementsTIP # 18
Project No:cp1104 STIP# AUB-40
Project Type:Intersection Improvement, Capacity
Project Manager:Jacob SweetingLOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 11,640 148,400 1,000 - 161,040 161,040
Grants (Federal)- 100,000 - - 100,000 100,000
REET2 - 119,000 - - 119,000 119,000
Traffic Impact Fees 3,040 46,960 - - 50,000 50,000
Other (Redflex)- - - - - -
14,680 414,3601,000 - 430,040 430,040
Capital Expenditures:
Design 14,680 100,000 1,000 - 115,680 115,680
Right of Way - 30,000 - - 30,000 30,000
Construction - 284,360 - - 284,360 284,360
14,680 414,360 1,000 - 430,040 430,040
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (Federal)- - - - - -
REET2 - - - - - -
Traffic Impact Fees - - - - - -
Other (Redflex)- - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
This project includes the design, right-of-way acquisition and construction of intersection improvements including a traffic signal with
accomodation for an easbound u-turn movement.
Progress Summary:
The design began in 2011 with construction scheduled for 2013.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Adopted Budget
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 48
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way North/1st Street NE Signal Improvements TIP # 19
Project No:cpxxxx
Project Type:Non-Capacity
Project Manager:TBD LOS Corridor ID# 2
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 50,000 - 50,000 175,000
Grants (Fed,State,Local)- - - - - 425,000
Traffic Impact Fees - - - - - -
Other - - - - - -
- - 50,000 - 50,000 600,000
Capital Expenditures:
Design - - 50,000 - 50,000 50,000
Right of Way - - - - - 100,000
Construction - - - - - 450,000
- - 50,000 - 50,000 600,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue 125,000 - - - 175,000 -
Grants (Fed,State,Local)425,000 - - - 425,000 -
Traffic Impact Fees - - - - - -
Other - - - - - -
550,000 - - - 600,000 -
Capital Expenditures:
Design - - - - 50,000 -
Right of Way 100,000 - - - 100,000 -
Construction 450,000 - - - 450,000 -
550,000 - - - 600,000 -
Grants / Other Sources:Grant funds are unsecure.
Total Funding Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Budget
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Description:
This project will construct a new traffic signal with controller cabinet and battery backup along with necessary intersection improvements.
Progress Summary:
Design will be completed in 2014. Construction is planned for 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 49
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Way South/M St SE Intersection ImprovementsTIP # 20
Project No:cp1024
Project Type:Capacity
Project Manager:Jacob SweetingLOS Corridor ID# 3,4
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 38,200 61,186 - - 99,386 99,386
Grants (Fed,State,Local)- 134,043 315,957 - 450,000 450,000
REET - - - - - -
Traffic Mitigation Funds - 150,000 - - 150,000 150,000
Other - - - - - -
38,200 345,229 315,957 - 699,386 699,386
Capital Expenditures:
Design 38,200 245,229 - - 245,229 283,429
Right of Way - 100,000 - - 100,000 100,000
Construction - - 315,957 - 315,957 315,957
38,200 345,229315,957 - 699,386 699,386
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - 315,957 -
REET - - - - - -
Traffic Mitigation Funds - - - - - -
Other - - - - - -
- - - - 315,957 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction - - - - 315,957 -
- - - - 315,957 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
This project is the first phase of improvements at the Auburn Way South/M St SE intersection. The project will construct new westbound
to northbound right-turn pockets, improved turning radius on the northeast corner, realignment of the westbound 17th St SE approach to
Auburn Way South, lighting improvements, related traffic signal modifications and right-of-way acquisition.
Progress Summary:
Pre-design was completed in 2012. Final design and right-of-way acquisition are planned for 2013 and construction is planned for 2014.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 50
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Main Street Signal UpgradesTIP # 21
Project No:cpxxxx
Project Type:Non-Capacity
Project Manager:TBD LOS Corridor ID# 11
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 265,000 315,000 315,000
Grants (Fed,State,Local)- - - - -
REET - - - - - -
Traffic Mitigation Fees - 150,000 - - 150,000 150,000
Other - - - - - -
- 200,000265,000 - 465,000 465,000
Capital Expenditures:
Design - 50,000 - 50,000 50,000
Right of Way - - - - - -
Construction - 150,000 265,000 - 415,000 415,000
- 200,000 265,000 - 465,000 465,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 265,000 -
Grants (Fed,State,Local)- - - - -
REET - - - - - -
Traffic Mitigation Fees - - - - -
Other - - - - - -
- - - - 265,000 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - -
Construction - - - 265,000 -
- - - - 265,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
Reconstruct the existing traffic signals at C St NW and W Main St and at E Main St and Auburn Ave/A St SE. The new C St NW signal
would provide protected left-turn phasing for C St, and would provide additional safety related to the railroad pre-emption. The Auburn
Ave/A St signal would replace one of the City's oldest signals which has exceeded its design life.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 51
CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Capital Projects Fund
Project Title: Traffic Signal ImprovementsTIP #34
Project No:Various
Project Type:Non-Capacity (Annual)
Project Manager:Scott NutterLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE 2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Fund Balance - - - - - -
Grants (Fed,State,Local)- - - - - -
REET 2 - 175,000 175,000 175,000 350,000 1,225,000
Other - - - - - -
- 175,000 175,000 175,000 350,000 1,225,000
Capital Expenditures:
Design - 25,000 25,000 25,000 50,000 175,000
Right of Way - - - - - -
Construction - 150,000 150,000 150,000 300,000 1,050,000
- 175,000 175,000 175,000 350,000 1,225,000
Total Expenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Fund Balance - - - - - -
Grants (Fed,State,Local)- - - - - -
REET 2 175,000 175,000 175,000 175,000 1,050,000 -
Other - - - - - -
175,000 175,000 175,000 175,000 1,050,000 -
Capital Expenditures:
Design 25,000 25,000 25,000 25,000 150,000 -
Right of Way - - - - - -
Construction 150,000 150,000 150,000 150,000 900,000 -
175,000 175,000 175,000 175,000 1,050,000 -
Grants / Other Sources:
Description:
This project includes procuring capital equipment needed to replace cabinets, video detection cameras, conflict monitors and upgrade
pedestrian pushbuttons to APS. This project is also used to make safety improvements to our signals like auxiliary heads and flashing yellow
arrows, or capacity improvements like right turn overlap signals. The City uses current traffic counts and accident data to determine
intersections for these improvements.
Progress Summary:
Project continues to complete various intersection improvements.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
Budget Amendments
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 52
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 37th St NW & B St NW Railroad Crossing Safety ImprovementsTIP # 38
Project No:cp1304 STIP# AUB-43
Project Type:Intersection Safety (Non-Capacity)
Project Manager:Jacob SweetingLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 26,900 - 76,900 76,900
Grants (Fed,State,Local)- 307,550 - - 307,550 307,550
REET - - - - - -
Other - - - - - -
- 357,550 26,900 - 384,450 384,450
Capital Expenditures:
Design - 45,000 - 45,000 45,000
Right of Way - 5,000 - - 5,000 5,000
Construction - 307,550 26,900 - 334,450 334,450
- 357,550 26,900 - 384,450 384,450
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 26,900 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Other - - - - - -
- - - - 26,900 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction - - - - 26,900 -
- - - - 26,900 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Bud get
Total Funding Sources:
Description:
This project will fund the design and construction of a pre-signal at the 37th Street NW/B Street NW intersection adjacent to the at-grade
BNSF rail crossing, and to mitigate impacts from the prpoosed BNSF third rail project. The project will include communication
improvements and advanced train detection for new warning times for advanced railroad pre-emption at the signal.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 53
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: ITS Dynamic Message SignsTIP # 50
Project No:cpxxxx
Project Type:Non-Capacity (ITS)
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - 30,000 - 60,000
Grants (Fed,State,Local)- - - 190,000 - 380,000
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - 220,000 - 440,000
Capital Expenditures:
Design - - - 20,000 - 40,000
Right of Way - - - - - -
Construction - - - 200,000 - 400,000
- - - 220,000 - 440,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - 30,000 - - 60,000 -
Grants (Fed,State,Local)- 190,000 - - 380,000 -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- 220,000- - 440,000 -
Capital Expenditures:
Design - 20,000 - - 40,000 -
Right of Way - - - - - -
Construction - 200,000 - - 400,000 -
- 220,000 - - 440,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project funds the design and construction of Dynamic Message Signs at various locations throughout the City. Dynamic message
signs are an important ITS tool for providing information to roadway users. Priority locations for sign placement are based on the
Comprehensive Transportation Plans ITS map and include Auburn Way N, Auburn Way S, W Valley Highway, E Valley Highway and Lea
Hill Rd.
Progress Summary:
The first phase of this project is scheduled to begin in 2015 or sooner if grant funding becomes available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 54
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: East Valley Highway ITS ExpansionTIP # 51
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 10
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 692,000
REET - - - - - -
Traffic Impact Fees - - - - - 108,000
Other - - - - - -
- - - - - 800,000
Capital Expenditures:
Design - - - - - 85,000
Right of Way - - - - - -
Construction - - - - - 715,000
- - - - - 800,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)692,000 - - - 692,000 -
REET - - - - - -
Traffic Impact Fees 108,000 - - - 108,000 -
Other - - - - - -
800,000 - - - 800,000 -
Capital Expenditures:
Design 85,000 - - - 85,000 -
Right of Way - - - - - -
Construction 715,000 - - - 715,000 -
800,000 - - - 800,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project funds the design, coordination, permitting and construction of ITS facilities from 41st St SE to Lake Tapps Parkway.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 55
CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Capital Projects Fund
Project Title: 8th Street NE and C Street NW ITS ImprovementsTIP # 52
Project No:cp1226
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 18, 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 5,000 - 55,000 55,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- 50,000 5,000 - 55,000 55,000
Capital Expenditures:
Design - 10,000 - - 10,000 10,000
Right of Way - - - - - -
Construction - 40,000 5,000 - 45,000 45,000
- 50,000 5,000 - 55,000 55,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 5,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- - - - 5,000 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction - - - - 5,000 -
- - - - 5,000 -
Grants / Other Sources:
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
This project will expand the City's ITS network to improve travel reliability, maintenance response, and emergency management
capabilities. The project includes the design, coordintation, permitting, and construction of the ITS expansion on the 8th Street NE/Lea
Hill Road corridor and at the C Street NW/W Main Street, C Street NW/3rd Street NW, and A Street NW/3rd Steet NW intersections.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Adopted Budget
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 56
CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Capital Projects Fund
Project Title: Auburn Way South and 12th Street SE Intersection ImprovementsTIP # 53
Project No:cp1114
Project Type:Capacity
Project Manager:Ryan VondrakLOS Corridor ID# 3
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 - - 50,000 50,000
Grants (Fed,State,Local)- - - - - 250,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- 50,000 - - 50,000 300,000
Capital Expenditures:
Design - 50,000 - - 50,000 50,000
Right of Way - - - - - -
Construction - - - - - 250,000
- 50,000 - - 50,000 300,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)250,000 - - - 250,000 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
250,000 - - - 250,000 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction 250,000 - - - 250,000 -
250,000 - - - 250,000 -
Grants / Other Sources:
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
The project will design multi-modal intersection improvements at the AWS/12th Street SE intersection. The improvements will include
pedestrian access, bicycle lanes, signal phasing and timing, and ITS upgrades. All aspects of the project will be completed with the
exception of construction which will be initiated with the allocation of future funding or the award of a grant.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 57
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Auburn Ave NE & 3rd St NE Pedestrian & Access ImprovementsTIP # 59
Project No:cp1023
Project Type:Capacity
Project Manager:Robert LeeLOS Corridor ID# 2
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 8,778 - - - 8,778 8,778
Grants (Fed,State,Local)- - - - - 250,000
Traffic Impact Fees - - 50,000 - 50,000 100,000
REET2 - - - - - -
Other - - - - - -
8,778 - 50,000 - 58,778 358,778
Capital Expenditures:
Design 8,778 - 50,000 - 58,778 58,778
Right of Way - - - - - -
Construction - - - - - 300,000
8,778 - 50,000 - 58,778 358,778
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)250,000 - - - 250,000 -
Traffic Impact Fees 50,000 - - - 100,000 -
REET2 - - - - - -
Other - - - - - -
300,000 - - - 350,000 -
Capital Expenditures:
Design - - - - 50,000 -
Right of Way - - - - - -
Construction 300,000 - - - 300,000 -
300,000 - - - 350,000 -
Grants / Other Sources:
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Adopted Budget
Description:
This project will improve access, safety and operations for pedestrian, bicyclists and motorized vehicles at the intersections of 3rd St
NE/Auburn Ave, 4th St NE/Auburn Ave, and 4th St NE/Auburn Way North. Improvements include a new traffic signal and geometric
improvements at 3rd St NE to add a missing pedestrian crossing and accomodate the northbound left-turn movement; improving
pedestrian facilities to meet ADA requirements, restricting uncontrolled accesses near the intersection, and modifying the traffic signal at
Auburn Way North and 4th St NE to eliminate the east/west split phase operation.
Progress Summary:
Survey and pre-design were started in 2010-2011. Pre-design will be completed in 2014, with construction scheduled for 2016, pending
grant funding.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 58
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 29th St SE/R St SE Intersection ImprovementsTIP # 63
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 16, 27
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - -
Grants (State)- - - - - 1,300,000
Traffic Impact Fees - - - - - 500,000
REET - - - - - -
Other - - - - - -
- - - - - 1,800,000
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - 450,000
Construction - - - - 1,000,000
- - - - - 1,800,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (State)- 1,300,000 - - 1,300,000 -
Traffic Impact Fees - 500,000 - - 500,000 -
REET - - - - - -
Other - - - - - -
- 1,800,000 - - 1,800,000 -
Capital Expenditures:
Design - 350,000 - - 350,000 -
Right of Way - 450,000 - - 450,000 -
Construction - 1,000,000 - - 1,000,000 -
- 1,800,000- - 1,800,000 -
Grants / Other Sources:
Budget Amendments
Adopted Bud get
Description:
This project funds the design, right-of-way acquisition and construction of intersection capacity and safety improvements at the 29th St
SE/R St SE intersection. This project will include creating eastbound/westbound dual left-turn lanes, auxiliary signal heads and pedestrian
safety enhancements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 59
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Citywide Traffic Signal Safety ImprovementsTIP# 67
Project No:cp1222 STIP# AUB-45
Project Type:Non-Capacity
Project Manager:Robert LeeLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 1,916 55,000 1,000 - 57,916 57,916
Grants (Fed,State,Local)- 400,000 - - 400,000 400,000
Traffic Impact Fees - - - - - -
REET2 - 25,000 - - 25,000 25,000
Other - - - - - -
1,916 480,0001,000 - 482,916 482,916
Capital Expenditures:
Design 1,916 80,000 1,000 - 82,916 82,916
Right of Way - - - - - -
Construction - 400,000 - - 400,000 400,000
1,916 480,0001,000 - 482,916 482,916
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees - - - - - -
REET2 - - - - - -
Other - - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Adopted Budget
Description:
This project will improve traffic signal phasing and timing, improve visibility of traffic signal heads, install countdown pedestrian signal
displays, and ADA pedestrian pushbuttons.
Progress Summary:
Grant funding was awarded June 2012 with no local match requirement. Project will be designed and constructed in 2013.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement Projects 60
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 61
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: A Street SE Non-Motorized and Access ImprovementsTIP # 23
Project No:cpxxxx
Project Type:Class 1 Trail (Capacity)
Project Manager:Leah DunsdonLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 53,900 - - - 53,900 53,900
Grants (Fed,State,Local)170,400 - 93,047 - 263,447 263,447
REET - - - - - -
Traffic Impact Fees -
Other - - - - - -
224,300 - 93,047 - 317,347 317,347
Capital Expenditures:
Design 224,300 - 93,047 - 317,347 317,347
Right of Way - - - - - -
Construction - - - - - -
224,300 - 93,047 - 317,347 317,347
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - 93,047 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other (Other Agencies)*- - - - - -
- - - - 93,047 -
Capital Expenditures:
Design - - - - 93,047 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 93,047 -
Grants / Other Sources: Expenditures prior to 2013 were for project c229a0.
Budget Amendments
Description:
Preliminary design of improvements to A Street SE between the White River Bridge and 41st Stret SE, including a signalized pedestrian
crossing and access management including consolidatoin of commercial driveways.
Progress Summary:
Remaining grant funds from the BNSF/E Valley Highway Pedestrian Underpass project are in the process of being reprogrammed to this
project. Preliminary design work has not begun.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $100.
Adopted Budget
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 62
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Academy Drive Multi-Use Trail TIP # 24
Project No:cpxxxx
Project Type:Class 1 Trail (Capacity)
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - 135,000
Grants (Fed,State,Local)- - - - - 765,000
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
- - - - - 900,000
Capital Expenditures:
Design - - - - - 50,000
Right of Way - - - - - -
Construction - - - - - 850,000
- - - - - 900,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue 50,000 42,500 42,500 - 135,000 -
Grants (Fed,State,Local)- 382,500 382,500 - 765,000 -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other Sources - - - - - -
50,000 425,000 425,000 - 900,000 -
Capital Expenditures:
Design 50,000 - - - 50,000 -
Right of Way - - - - - -
Construction - 425,000 425,000 - 850,000 -
50,000 425,000 425,000 - 900,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will use existing Acadamy Dr right-of-way to create a multi-use trail on between the Green River Rd and Auburn Way S.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,680.
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 63
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: METRO Shuttle: Auburn Community and Lakeland ShuttlesTIP # 26
Project No:NA
Project Type:Other
Project Manager:Pablo ParaLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 240,000 240,000 250,000 480,000 1,770,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Other (TBD)- - - - - -
- 240,000 240,000 250,000 480,000 1,770,000
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Operating Costs - 240,000 240,000 250,000 480,000 1,770,000
- 240,000240,000 250,000 480,000 1,770,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue 250,000 260,000 260,000 270,000 1,530,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Other (TBD)- - - - - -
250,000 260,000260,000 270,000 1,530,000 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Operating Costs 250,000 260,000 260,000 270,000 1,530,000 -
250,000 260,000 260,000 270,000 1,530,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Budget
Adopted Budget
Description:
Operating costs associated with two new Metro routes: a Commuter Shuttle from the Lakeland Hills neighborhood to Auburn Station and
a Community Shuttle linking residential neighborhoods with commercial and service centers.
Progress Summary:
The Lakeland Hills route began in 2009, the community shuttle in 2010. Funding assistance will be requested through the Transit Now
Partnership Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 64
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Citywide Pedestrian Accessibility and Safety Program TIP # 30
Project No:cpxxxx
Project Type:Non-Capacity (Annual)
Project Manager:Pablo ParaLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 150,000 150,000 150,000 900,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- - 150,000 150,000 150,000 900,000
Capital Expenditures:
Design - - 15,000 15,000 15,000 90,000
Right of Way - - - - - -
Construction - - 135,000 135,000 135,000 810,000
- - 150,000 150,000 150,000 900,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Funding Sources:
Unrestricted Street Revenue 150,000 150,000 150,000 150,000 900,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
150,000 150,000150,000 150,000 900,000 -
Capital Expenditures:
Design 15,000 15,000 15,000 15,000 90,000 -
Right of Way - - - - - -
Construction 135,000 135,000 135,000 135,000 810,000 -
150,000 150,000150,000 150,000 900,000 -
Grants / Other Sources:
Budget Amendments
Adopted Budget
Description:
This is an annual program to fund small pedestrian improvement projects at locations throughout the City. Projects are prioritized
annually based on pedestrian demands, existing deficiencies, and citizen requests.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 65
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Special Revenue Fund
Project Title: Citywide Arterial Bicycle & Safety Improvements TIP # 31
Project No:cpxxxx
Project Type:Non-Capacity (Safety)
Project Manager:Various LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 100,000 - 100,000 300,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- - 100,000 - 100,000 300,000
Capital Expenditures:
Design - - 10,000 - 10,000 30,000
Right of Way - - - - - -
Construction - - 90,000 - 90,000 270,000
- - 100,000 - 100,000 300,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue 100,000 100,000 300,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
100,000 - 100,000 - 300,000 -
Capital Expenditures:
Design 10,000 10,000 30,000 -
Right of Way - - - - - -
Construction 90,000 90,000 270,000 -
100,000 - 100,000 - 300,000 -
Grants / Other Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Budget
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
This is a bi-annual program to fund bicycle and safety improvements on classified roadways. Projects are prioritized annually based upon
field studies. Project was previously called "Citywide Roadway Safety Infrastructure Improvements".
Progress Summary:
2013 project is funding improvements at the W Main St/C Street intersection as part of TIP # 21, and at the 37th Street NW/B Street NW
intersection as part of TIP # 38.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 66
CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Capital Projects Fund
Project Title: Citywide Sidewalk Repairs & Improvements TIP #32
Project No:cp1301
Project Type:Non-Capacity (Annual)
Project Manager:Seth WickstromLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE 2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Fund Balance - - 25,000 25,000 25,000 150,000
Grants (Fed,State,Local)- - 100,000 100,000 100,000 600,000
REET 2 - - - - - -
To Be Determined - - - - - -
- - 125,000 125,000 125,000 750,000
Capital Expenditures:
Design - - 15,000 15,000 15,000 90,000
Right of Way - - - - - -
Construction - - 110,000 110,000 220,000 660,000
- - 125,000 125,000 125,000 750,000
Total Expenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Fund Balance 25,000 25,000 25,000 25,000 150,000 -
Grants (Fed,State,Local)100,000 100,000 100,000 100,000 600,000 -
REET 2 - - - - - -
To Be Determined - - - - - -
125,000 125,000 125,000 125,000 750,000 -
Capital Expenditures:
Design 15,000 15,000 15,000 15,000 90,000 -
Right of Way - - - - - -
Construction 110,000 110,000 110,000 110,000 660,000 -
125,000 125,000 125,000 125,000 750,000 -
Grants / Other Sources: Grant funds are not secure
Description:
Project funds sidewalk improvements at multiple locations throughout the City. A sidewalk inventory was completed in 2004. An nual projects
are selected based upon criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian corridor or
"linkage", connectivity to transit service, ADA requirements, and "Save our Streets" (SOS) project locations.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Total Funding Sources:
Adopted Budget
Budget Amendments
Adjusted Budget
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 67
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: A Street NE Pedestrian ImprovementsTIP # 44
Project No:cpxxxx
Project Type:Sidewalk Improvements (Non-Capacity)
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 150,000
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - - - 150,000
Capital Expenditures:
Design - - - - - 15,000
Right of Way - - - - - -
Construction - - - - - 135,000
- - - - - 150,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 150,000 - - 150,000 -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- 150,000- - 150,000 -
Capital Expenditures:
Design - 15,000 - - 15,000 -
Right of Way - - - - - -
Construction - 135,000 - - 135,000 -
- 150,000 - - 150,000 -
Grants / Other Sources:Grant funds are unsecure.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Bud get
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project completes a pedestrian connection between Downtown Auburn and the 8th St NE business district. This project will improve
a pedestrian crossing at 3rd St NE, and construct sidewalks/access ramps along the A St NE corridor.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $500.
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 68
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Interurban Trailhead ImprovementsTIP # 45
Project No:cpxxxx
Project Type:Class 1 Trail (Non-Capacity)
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - 210,000
Traffic Mitigation Fees - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - - - 210,000
Capital Expenditures:
Design - - - - - 20,000
Right of Way - - - - - -
Construction - - - - - 190,000
- - - - - 210,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- 210,000 - - 210,000 -
Traffic Mitigation Fees - - - - - -
PWTFL - - - - - -
Other - - - - - -
- 210,000 - - 210,000 -
Capital Expenditures:
Design - 20,000 - - 20,000 -
Right of Way - - - - - -
Construction - 190,000 - - 190,000 -
- 210,000 - - 210,000 -
Grants / Other Sources:Grant funds are unsecure.
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project provides funding for enhancements to existing trailheads and construction of new trailheads. Improvements include bike
racks, kiosks, parking and access.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 69
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Lea Hill Safe Routes to School ImprovementsTIP # 56
Project No:cp1120 STIP# AUB-39
Project Type:Non-Motorized
Project Manager:Kim TruongLOS Corridor ID# 19
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 777 - 1,000 - 1,777 1,777
Grants (Fed,State,Local)25,638 372,862 - - 398,500 398,500
Traffic Impact Fees - - - - - -
REET2 - - - - - -
Other - - - - - -
26,415 372,862 1,000 - 400,277 400,277
Capital Expenditures:
Design 26,415 24,362 1,000 - 51,777 51,777
Right of Way - - - - - -
Construction - 348,500 - - 348,500 348,500
26,415 372,8621,000 - 400,277 400,277
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 1,000 -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees - - - - - -
REET2 - - - - - -
Other - - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project will construct pedestrian improvements along the south-side of SE 312th St to the east of 24th Ave SE, intersection
improvements at 116th Ave SE & SE 304th St, stripe bike lanes on 116th Ave SE between SE 312th St and SE 304th St and improve
curb ramps adjacent to Rainier Middle School.
Progress Summary:
The City was awarded $398,500 in federal funding in May 2011, which consists of $75,700 for School District education/encouragement,
$1,800 for Police Dept. enforcement and $321,000 for engineering, right of way, and construction.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Non-Motorized & Transit Improvement Projects 70
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 71
CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Capital Projects Fund
Project Title: Mohawks Plastics Site Mitigation ProjectTIP #13
Project No:cp0767
Project Type: Non-Capacity
Project Manager: Jeff Dixon/Leah DunsdonLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Fund Balance - - - - - -
Grants - - - - - -
Bond Proceeds - - - - - -
Traffic Impact Fees 382,304 25,000 25,000 20,000 432,304 557,304
REET 2 169,186 - - - 169,186 169,186
551,490 25,000 25,000 20,000 601,490 726,490
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - 621,490
Construction 551,490 25,000 25,000 20,000 601,490 726,490
551,490 25,000 25,000 20,000 601,490 726,490
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Fund Balance - - - - - -
Grants - - - - -
Bond Proceeds - - - - - -
Traffic Impact Fees 20,000 65,000 20,000 - 150,000 -
REET 2 - - - - - -
20,000 65,000 20,000 - 150,000 -
Capital Expenditures:
Design - - - - - -
Right of Way - - - - - -
Construction 20,000 65,000 20,000 - 150,000 -
20,000 65,000 20,000 - 150,000 -
Grants / Other Sources:
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Adopted Budget
Description:
The project consists of the design, construction, maintenance and monitoring of approximately 2.2-acres of wetland creation and
approximately 0.4-acres of wetland enhancement within the Goedecke South Property owned by the Sewer Utility in order to compensate for
approximately 1.6-acre wetland loss on the Mohawk Plastics property (Parcel # 1321049056). The project was approved under an existing
agreement approved by Resolution No. 4196, June 2007.
Progress Summary:
The City received the DOE WQ Certification, WDFW HPA, and on May 7, 2009, the Army Corps of Engineers (Corps) 404 wetland permit
(NWS-2007-1913). Subsequently, bid specifications and construction plans were prepared and construction began in October 2009.
Construction was completed in January 2010 and the project is currently within the 10-year monitoring period, which involves annual
maintenance, monitoring and reporting.
Future Impact on Operating Budget:
It is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a
period of 10 years, in conformance with permit requirements. After the successful conclusion of this 10-year monitoring period, which is
anticipated to be in December 2019, ongoing operation expenses should be minimal.
Budget Amendments
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 72
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: A Street SE Safety Improvements StudyTIP # 27
Project No:cp1110
Project Type:Safety (Non-Capacity)
Project Manager:James WebbLOS Corridor ID# 10,33
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 1,160 8,840 50,000 - 60,000 60,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Fees - - - - - -
Other - - - - - -
1,160 8,840 50,000 - 60,000 60,000
Capital Expenditures:
Design 1,160 8,840 50,000 - 60,000 60,000
Right of Way - - - - - -
Construction - - - - - -
1,160 8,840 50,000 - 60,000 60,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 50,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- - - - 50,000 -
Capital Expenditures:
Design - - - - 50,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 50,000 -
Grants / Other Sources:
Budget Amendments
Adopted Budget
Description:
Study the A Street SE corridor between 6th Street SE and Lakeland Hills Way SE including 41st St SE from D St SE to C St SE. The
study will review the safety and access needs of the traveling public and the adjacent properties.
Progress Summary:
In-house pre-design will be done to refine project scope, alignment, and cost will be complete in 2013. 2014 design will complete detailed
corridor plan for future improvements.
Future Impact on Operating Budget:
This study will have no impact on the operating budget for street maintenance.
Adjusted Budget
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 73
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: S 277th Street - Wetland Mitigation TIP # 29
Project No:c410a0
Project Type:Non-Capacity
Project Manager:Leah DunsdonLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue 240,339 50,000 25,000 - 315,339 315,339
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
240,339 50,000 25,000 - 315,339 315,339
Capital Expenditures:
Design 116,883 31,862 20,500 - 169,245 169,245
Right of Way - - - - - -
Construction 123,456 18,138 4,500 - 146,094 146,094
240,339 50,000 25,000 - 315,339 315,339
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 25,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Impact Fees - - - - - -
Other - - - - - -
- - - - 25,000 -
Capital Expenditures:
Design - - - - 20,500 -
Right of Way - - - - - -
Construction - - - - 4,500 -
- - - - 25,000 -
Grants / Other Sources:
Total Expenditures:
Total Funding Sources:
Adjusted Budget
Adopted Budget
Budget Amendments
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Description:
Wetland mitigation for the S 277th St grade separation project.
Progress Summary:
This is a 10-year obligation, which began in 2004.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 74
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: 104th Ave SE & Green River Road StudyTIP # 46
Project No:cpxxxx
Project Type:Non-Capacity (Intersection Safety)
Project Manager:James WebbLOS Corridor ID# 24
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 5,000 - 5,000 5,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - 5,000 - 5,000 5,000
Capital Expenditures:
Design - - 5,000 - 5,000 5,000
Right of Way - - - - - -
Construction - - - - - -
- - 5,000 - 5,000 5,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 5,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - - 5,000 -
Capital Expenditures:
Design - - - - 5,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 5,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project funds a pre-design study to determine the right-of-way, environmental and construction requirements for intersection safety
improvements. The project is anticipated to include sight-distance improvements, constructing turn-lanes, channelization, environmental
mitigation, signage and clear zone improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 75
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Environmental Park Roadway Improvements StudyTIP # 47
Project No:cpxxxx
Project Type:Capacity
Project Manager:James WebbLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
Adopted Budget - - - -
Budget Amendments - - - -
Adjusted Budget - - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 10,000 - 10,000 10,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
Total Funding Sources:- - 10,000 - 10,000 10,000
Capital Expenditures:
Design - - 10,000 - 10,000 10,000
Right of Way - - - - - -
Construction - - - - - -
Total Exp enditures:- - 10,000 - 10,000 10,000
Forecasted Project Cost:
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
Total Funding Sources:- - - - - -
Capital Expenditures:
Design - - - 10,000 -
Right of Way - - - - - -
Construction - - - - - -
Total Expenditures:- - - - 10,000 -
Grants / Other Sources:
Description:
This project will study the feasibility, scope and cost of low impact roadway, bicycle and pedestrian improvements in the Environmental
Park area. Included in this study scope is a connection between Clay St NW and Western St NW.
Progress Summary:
Future Impact on Operating Budget:
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 76
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Downtown to Les Gove Park Non-Motorized Improvements StudyTIP # 48
Project No:cpxxxx
Project Type:Bike Lanes, Sidewalks and Transit Improvement Study (Capacity)
Project Manager:James WebbLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 10,000 - 10,000 10,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - 10,000 - 10,000 10,000
Capital Expenditures:
Design - - 10,000 - 10,000 10,000
Right of Way - - - - - -
Construction - - - - - -
- - 10,000 - 10,000 10,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - 10,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
PWTFL - - - - - -
Other - - - - - -
- - - - 10,000 -
Capital Expenditures:
Design - - - - 10,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 10,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project funds a study of the 2nd St SE and F St SE corridor between Downtown Auburn and Les Gove Park. Improvements may
include pavement reconstruction, sidewalks, access ramps, signal modifications and route signing.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 77
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: S 316th St Bicycle & Pedestrian Improvement StudyTIP # 49
Project No:cpxxxx
Project Type:Class 2 Bike Lanes / Sidewalks (Capacity)
Project Manager:TBD LOS Corridor ID# 37
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - 5,000 - 5,000 5,000
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees - - - - - -
- - 5,000 - 5,000 5,000
Capital Expenditures:
Design - - 5,000 - 5,000 5,000
Right of Way - - - - - -
Construction - - - - - -
- - 5,000 - 5,000 5,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Fundin g Sources:
Unrestricted Street Revenue - - - - 5,000 -
Grants (Fed,State,Local)- - - - - -
Traffic Impact Fees - - - - - -
- - - - 5,000 -
Capital Expenditures:
Design - - - - 5,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 5,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This project funds a study to add bicycle and pedestrian facilities on S 316th St from east of Evergreen Heights Elementary School to
51st Ave S.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Preliminary Engineering and Miscellaneous Projects 78
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Kersey Way SE Corridor StudyTIP # 54
Project No:cpxxxx
Project Type:Capacity
Project Manager:TBD LOS Corridor ID# 4
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Fees - - 50,000 - 50,000 50,000
Other - - - - - -
- - 50,000 - 50,000 50,000
Capital Expenditures:
Design - - 50,000 - 50,000 50,000
Right of Way - - - - - -
Construction - - - - - -
- - 50,000 - 50,000 50,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Unrestricted Street Revenue - - - - - -
Grants (Fed,State,Local)- - - - - -
- - - - - -
Traffic Mitigation Fees - - - - 50,000 -
Other (Developer)*- - - - - -
- - - - 50,000 -
Capital Expenditures:
Design - - - - 50,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 50,000 -
Grants / Other Sources:
Budget Amendments
Adjusted Bud get
Adopted Budget
Description:
This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The study will
develop the scope and costs for horizontal/vertical geometric roadway improvements, roadside hazard mitigation, street lighting and non-
motorized trail construction. The project length is approximately two miles.
Progress Summary:
Design will begin in 2015 following the completion of the update to the Comprehensive Plan.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Total Expenditures:
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 79
ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Funds
Project Title: West Valley Highway System Preservation (15th St NW to 37th St NW)TIP #22
Project No:cp1225 STIP# AUB-41
Project Type:Non-Capacity, Preservation
Project Manager:Seth WickstromLOS Corridor ID# 14
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Arterial Preservation Fund Balance 10,000 560,000 1,000 - 571,000 571,000
Grant Funding(Federal, State, Local)- 560,000 - - 560,000 560,000
Utility Tax - - - - -
REET2 - - - - - -
Bond Proceeds - - - - - -
10,000 1,120,000 1,000 - 1,131,000 1,131,000
Capital Expenditures:
Design 10,000 40,000 1,000 - 51,000 51,000
Right of Way - - - - - -
Construction - 1,080,000 - - 1,080,000 1,080,000
10,000 1,120,000 1,000 - 1,131,000 1,131,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Arterial Preservation Fund Balance - - - - 1,000 -
Grant Funding(Federal, State, Local)- - - - - -
Utility Tax - - - - - -
REET2 - - - - - -
Bond Proceeds - - - - - -
- - - - 1,000 -
Capital Expenditures:
Design - - - - 1,000 -
Right of Way - - - - - -
Construction - - - - - -
- - - - 1,000 -
Grants / Other Sources:
Adopted Budget
Description: The West Valley Highway System Preservation project will overlay the failing portions of the street pavement between 15th
Street NW and 37th Street NW. This entails the installation of a leveling course, providing a 2”-3” thick asphalt concrete overlay, and
includes minor surface utility adjustments.
Progress Summary:
FHWA STP Grant funding was secured in 2012.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Total Expenditures:
Budget Amendments
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 80
ARTERIAL STREET FUND (102)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Fund
Project Title: Annual Bridge Structure PreservationTIP # 28
Project No:Various
Project Type:Non-Capacity, Preservation
Project Manager:James WebbLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Pro ject
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Unrestricted Street Revenue - 50,000 50,000 50,000 100,000 350,000
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Fees - - - - - -
Other - - - - - -
- 50,000 50,000 50,000 100,000 350,000
Capital Expenditures:
Design - 5,000 5,000 5,000 10,000 35,000
Right of Way - - - - - -
Construction - 45,000 45,000 45,000 90,000 315,000
- 50,000 50,000 50,000 100,000 350,000
TotalExpenditures
20162017201820192014-201 9 Beyond 2019
Funding Sources:
Unrestricted Street Revenue 50,000 50,000 50,000 50,000 300,000 -
Grants (Fed,State,Local)- - - - - -
REET - - - - - -
Traffic Mitigation Fees - - - - - -
Other - - - - - -
50,000 50,000 50,000 50,000 300,000 -
Capital Expenditures:
Design 5,000 5,000 5,000 5,000 30,000 -
Right of Way - - - - - -
Construction 45,000 45,000 45,000 45,000 270,000 -
50,000 50,000 50,000 50,000 300,000 -
Grants / Other Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Bud get
Budget Amendments
Adjusted Budget
Total Funding Sources:
Description:
This is an annual program to fund improvements to bridge structues identified by the city's annual bridge inspection program.
Progress Summary:
Program completed load rating calculations for nine bridges in 2011. 2012 project completed miscellaneous bridge repairs. Inspections of
nine bridges were completed in 2012.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 81
ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Funds
Project Title: Arterial Street Preservation ProgramTIP #35
Project No:cp1302
Project Type:Non-Capacity, Preservation
Project Manager:Seth WickstromLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Arterial Preservation Fund - - - - - -
Property Tax - - - - - -
Utility Tax - 1,300,000 1,800,000 1,650,000 3,100,000 11,750,000
REET2 - - - - - -
Bond Proceeds - - - - - -
- 1,300,000 1,800,000 1,650,000 3,100,000 11,750,000
Capital Expenditures:
Design - 20,000 20,000 20,000 40,000 140,000
Right of Way - - - - - -
Construction - 1,280,000 1,780,000 1,630,000 3,060,000 11,610,000
- 1,300,000 1,800,000 1,650,000 3,100,000 11,750,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Arterial Preservation Fund - - - - - -
Property Tax - - - - - -
Utility Tax 1,700,000 1,700,000 1,800,000 1,800,000 10,450,000 -
REET2 - - - - - -
Bond Proceeds - - - - - -
1,700,000 1,700,000 1,800,000 1,800,000 10,450,000 -
Capital Expenditures:
Design 20,000 20,000 20,000 20,000 120,000 -
Right of Way - - - - - -
Construction 1,680,000 1,680,000 1,780,000 1,780,000 10,330,000 -
1,700,000 1,700,000 1,800,000 1,800,000 10,450,000 -
Grants / Other Sources:
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Adopted Budget
Description: Implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These projects may
include a combination of overlays, rebuilds, and spot repairs. This program is funded through a 1% utility tax that was adopted by City
Council during 2008.
Progress Summary:
Program continues to successfully complete annual patching and overlay projects citywide.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Budget Amendments
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 82
ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Funds
Project Title: Arterial Crack Seal ProgramTIP #36
Project No:cpxxxx
Project Type:Non-Capacity, Preservation
Project Manager:Seth WickstromLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Arterial Preservation Fund - - - - - -
Utility Tax - 200,000 200,000 200,000 400,000 1,400,000
REET - - - - - -
Bond proceeds - - - - - -
- 200,000 200,000 200,000 400,000 1,400,000
Capital Expenditures:
Design - 20,000 20,000 20,000 40,000 140,000
Right of Way - - - - - -
Construction - 180,000 180,000 180,000 360,000 1,260,000
- 200,000 200,000 200,000 400,000 1,400,000
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Arterial Preservation Fund - - - - - -
Utility Tax 200,000 200,000 200,000 200,000 1,200,000 -
REET - - - - - -
Bond proceeds - - - - - -
200,000 200,000 200,000 200,000 1,200,000 -
Capital Expenditures:
Design 20,000 20,000 20,000 20,000 120,000 -
Right of Way - - - - - -
Construction 180,000 180,000 180,000 180,000 1,080,000 -
200,000 200,000 200,000 200,000 1,200,000 -
Grants / Other Sources:
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Description:
Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing the cracks will prolong the life of the
pavement by stopping water from draining into the sub-base of the road.
Progress Summary:
Program continues to successfully extend pavement life pavement citywide.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Adopted Budget
Budget Amendments
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 83
LOCAL STREET FUND (103)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019 Special Revenue Fund
Project Title: Local Street Improvement Program TIP# 37
Project No:Various
Project Type:Non-Capacity, Preservation
Project Manager:Seth WickstromLOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget 2015 BudgetProject TotalCost
Local Street Fund - 1,050,000 - - 1,050,000 1,050,000
Transfer In - 150,000 150,000 150,000 300,000 1,050,000
Property Tax - - - - - -
Sales Tax on Construction - 1,474,250 1,294,300 1,307,243 2,768,550 9,436,803
Bond Proceeds - - - - - -
Other - - 498,000 - 498,000 498,000
- 2,674,250 1,942,300 1,457,243 4,616,550 12,034,803
Capital Expenditures:
Design - 240,800 250,000 200,000 490,800 1,490,800
Right of Way - - - - - -
Construction - 2,433,450 1,692,300 1,257,243 5,382,993 10,544,003
- 2,674,250 1,942,300 1,457,243 4,616,550 12,034,803
TotalExpenditures
20162017201820192014-2019Beyond 2019
Funding Sources:
Local Street Fund - - - - - -
Transfer In 150,000 150,000 150,000 150,000 900,000
Property Tax - - - - - -
Sales Tax on Construction 1,320,315 1,333,519 1,346,854 1,360,322 7,962,553 -
Bond Proceeds - - - - - -
Other - - - - 498,000 -
1,470,315 1,483,519 1,496,854 1,510,322 9,360,553 -
Capital Expenditures:
Design 200,000 200,000 200,000 200,000 1,250,000 -
Right of Way - - - - - -
Construction 1,270,315 1,283,519 1,296,854 1,310,322 8,110,553 -
1,470,315 1,483,519 1,496,854 1,510,322 9,360,553 -
Grants / Other Sources: 2015-2019 Sales tax is increased by 1% per year
Adjusted Budget
Total Funding Sources:
Total Expenditures:
Total Expenditures:
Total Funding Sources:
Forecasted Project Cost:
Description:
The program preserves local (unclassified) streets. The work includes crack sealing, asphalt patching, pre-leveling, asphalt overlays and
roadway reconstruction. Beginning in 2013 funding sources include annual sales tax on construction up to $2.5 million per year.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Progress Summary:
This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on
reconstruction in 2013 and 2014.
Adopted Budget
Budget Amendments
City of Auburn Transportation Improvement Program
Roadway Preservation Projects 84
ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan
Six Year Capital Facilities Plan, 2014-2019Special Revenue Funds
Project Title: Arterial Bridge Deck RehabilitationTIP #57
Project No:cpxxxx
Project Type:Non-Capacity, Preservation
Project Manager:TBD LOS Corridor ID# N/A
Budget: 2013YTD Actual20142013 Budget
BudgetExpendituresBudgetBalance
- - - -
- - - -
- - - -
Activity:
(Previous Yrs)2013 YE2014 Year EndTotal Project
Funding Sources:Prior to 2013Estimate2014 Budget2015 BudgetProject TotalCost
Arterial Preservation Fund - - - - - -
Utility Tax - - 250,000 250,000 250,000 500,000
REET - - - - - -
Bond proceeds - - - - - -
- - 250,000 250,000 250,000 500,000
Capital Expenditures:
Design - - 25,000 25,000 25,000 50,000
Right of Way - - - - - -
Construction - - 225,000 225,000 225,000 450,000
- - 250,000 250,000 250,000 500,000
TotalExpenditures
2016 2017 2018 20192014-2019Beyond 2019
Funding Sources:
Arterial Preservation Fund - - - - - -
Utility Tax - - - - 500,000 -
REET - - - - - -
Bond proceeds - - - - - -
- - - - 500,000 -
Capital Expenditures:
Design - - - - 50,000 -
Right of Way - - - - - -
Construction - - - - 450,000 -
- - - - 500,000 -
Grants / Other Sources:
Adjusted Bud get
Description:
This is an annual program to fund the rehabilitation of bridge decks as identified by the city's annual bridge inspection program.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Adopted Budget
Budget Amendments
Total Funding Sources:
Total Expenditures:
Forecasted Project Cost:
Total Funding Sources:
Total Expenditures:
City of Auburn
2014-2019 Transportation Improvement Program Summary
Project
Number
TIP
#Project Title Grant
Status Prior to 2014201420152016201720182019Beyond 2019 Total Project
Cost Project Category
c207a01A St NW - Phase 1 (3rd St NW to 14th St NW)Secured 8,143,52625,000350,00025,00025,00025,00025,000175,0008,793,526 Roadway
cp11182 Auburn Way South Pedestrian Improvements
(Dogwood St SE to Fir St SE)Secured 1,055,8301,000- - - - - - 1,056,830 Roadway
c409a03Auburn Way South (4th St NE to 4th St SE)Unsecured 78,251- - - 818,700- 3,000,000- 3,896,951 Roadway
c415a04I Street NE Corridor (45th St NE to S 277th St)Unsecured 161,827- - - 6,760,000- - - 6,921,827 Roadway
c201a05M Street Underpass (3rd St SE to 8th St SE)Secured 22,479,029109,550109,070108,590107,550106,520105,4902,286,64022,440,389 Roadway
c222a06S 277th Street (AWN to L Street NE)Unsecured 1,258,050153,0005,187,300- - - - - 6,598,350 Roadway
cpxxxx715th St SW ReconstructionUnsecured - - - 375,0003,000,000- - - 3,375,000 Roadway
cpxxxx8A Street NW, Phase 2 (W Main St to 3rd St NW)Unsecured 150,000- 150,000- 3,000,000- - - 3,300,000 Roadway
cpxxxx9D Street NW (37th St NW to 44th St NW)Unsecured - - - - 300,000- 6,000,000- 6,300,000 Roadway
cp091110F Street SE (4th St SE to AWS)Unsecured 7,620250,000- 2,250,000- - - - 2,507,620 Roadway
cpxxxx11M Street NE (E Main St to 4th St NE)Unsecured - 50,000275,0001,150,000- - - - 1,475,000 Roadway
cpxxxx12Grade-Separated Crossing of BNSF RailyardUnsecured - - - - - - 1,125,00031,000,00032,125,000 Roadway
cp076713Mohawk Plastics Site Mitigation ProjectN/A 576,49025,00020,00020,00065,00020,000- - 726,490 Miscellaneous
cpxxxx14M Street SE/12th Street SE Traffic SignalUnsecured - - - - 625,000- - - 625,000 Intersection, Signal &
ITS
cpxxxx158th Street NE Widening (Pike St NE to R St NE)Unsecured - - 450,0001,000,000- - - - 1,450,000 Roadway
cpxxxx1649th Street NE (Auburn Way North to I St NE)Unsecured - 850,0002,500,000- - - - - 3,350,000 Roadway
cp061117Harvey Rd NE/8th NE Intersection ImprovementsN/A 2,080,80086,50086,00085,60085,20084,80084,400741,6001,731,800 Intersection, Signal &
ITS
cp1104188th St NE/104th Ave SE Intersection ImprovementsSecured 429,0401,000- - - - - - 430,040 Intersection, Signal &
ITS
cpxxxx19Auburn Way North/1st Street NE Signal ImprovementsUnsecured - 50,000- 550,000- - - - 600,000 Intersection, Signal &
ITS
cp102420 Auburn Way South/M Street SE Intersection
Improvements Unsecured 383,429315,957- - - - - - 699,386 Intersection, Signal &
ITS
cpxxxx21Main Street Signal UpgradesSecured 200,000265,000- - - - - - 465,000 Intersection, Signal &
ITS
cp122522 West Valley Highway System Preservation (15th St
NW to 37th St NW)Secured 1,130,0001,000- - - - - - 1,131,000 Preservation
cpxxxx23A Street SE Non-Motorized and Access ImprovementsUnsecured 224,30093,047- - - - - - 317,347 Non-Motorized
cpxxxx24Academy Drive Multi Use TrailUnsecured - - - 50,000425,000425,000- - 900,000 Non-Motorized
cp091225Citywide Guardrail ImprovementsSecured 552,2751,000- - - - - - 553,275 Roadway
NA26 METRO Shuttle: Auburn Community and Lakeland
Shuttles N/A 240,000240,000250,000250,000260,000260,000270,000- 1,770,000 Transit
cp111027A Street SE Safety Improvements StudyN/A 10,00050,000- - - - - - 60,000 Study
cp100828Annual Bridge Structure PreservationN/A 50,00050,00050,00050,00050,00050,00050,000- 350,000 Preservation
c410a029S 277th Street - Wetland MitigationN/A 290,33925,000- - - - - - 315,339 Miscellaneous
Various30Citywide Pedestrian Accessibility and Safety ProgramN/A - 150,000150,000150,000150,000150,000150,000- 900,000 Non-Motorized
Various31Citywide Arterial Bicycle & Safety Imp N/A - 100,000- 100,000- 100,000- - 300,000 Non-Motorized
Various32Citywide Sidewalk Repairs and ImprovementsN/A - - - - - - - - - Non-Motorized
cpxxxx33BNSF 3rd Rail Expansion Roadway ImprovementsUnsecured - 25,000- - - - - - 25,000 Roadway
Various34Traffic Signal ImprovementsN/A 175,000175,000175,000175,000175,000175,000175,000- 1,225,000 Intersection, Signal &
ITS
Various35Arterial Street Preservation Program N/A 1,300,0001,800,0001,650,0001,700,0001,700,0001,800,0001,800,000- 11,750,000 Preservation
Various36Arterial Street Crack SealN/A 200,000200,000200,000200,000200,000200,000200,000- 1,400,000 Preservation
Various37Local Streets Improvement ProgramN/A 2,674,2501,942,3001,457,2431,470,3151,483,5191,496,8541,510,322- 12,034,803 Preservation
cp082038 37th St NW & B St NW Railroad Crossing Safety
Improvements Secured 357,55026,900- - - - - - 384,450 Intersection, Signal &
ITS
cpxxxx39124th Ave SE Corridor Improvements - Phase 2Unsecured - - - - 100,000750,000- - 850,000 Roadway
cpxxxx40124th Ave SE Corridor Improvements - Phase 1Unsecured - 200,0002,750,000- - - - - 2,950,000 Roadway
cpxxxx41R Street BypassUnsecured - - - - - - 408,0005,700,0006,108,000 Roadway
cpxxxx42SE 320th St Corridor ImprovementsUnsecured - - 50,00060,000580,000- - - 690,000 Roadway
cp121843 Auburn Way South (SR-164) Corridor Safety
Improvements Secured 252,6842,083,108- - - - - - 2,335,792 Roadway
cpxxxx44A Street NE Pedestrian ImprovementsUnsecured - - - - 150,000- - - 150,000 Non-Motorized
cpxxxx45Interurban Trailhead ImprovementsUnsecured - - - - 210,000- - - 210,000 Non-Motorized
cp102146104th Ave SE & Green River Road StudyN/A - 5,000- - - - - - 5,000 Study
cpxxxx47Environmental Park Roadway Improvements StudyN/A - 10,000- - - - - - 10,000 Study
cpxxxx48 Downtown to Les Gove Non-Motorized Improvements
Study N/A - 10,000- - - - - - 10,000 Study
cpxxxx49S 316th St Bicycle & Pedestrian Improvements StudyN/A - 5,000- - - - - - - Study
cpxxxx50ITS Dynamic Message SignsUnsecured - - 220,000- 220,000- - - 440,000 Intersection, Signal &
ITS
cpxxxx51East Valley Hwy ITS ExpansionUnsecured - - - 800,000- - - - 800,000 Intersection, Signal &
ITS
cpxxxx528th Street NE and C Street NW ITS ImprovementsUnsecured 50,0005,000- - - - - - 55,000 Intersection, Signal &
ITS
cpxxxx53AWS and 12th Street SE Intersection ImprovementsUnsecured 50,000- - 250,000- - - - 300,000 Intersection, Signal &
ITS
cpxxxx54Kersey Way SE Corridor StudyN/A - 50,000- - - - - - 50,000 Study
cpxxxx55W Main Street ImprovementsUnsecured - - - - 640,0002,850,000- - 3,490,000 Roadway
cp112056Lea Hill Safe Routes to School ImprovementsSecured 399,2771,000- - - - - - 400,277 Non-Motorized
cpxxxx57Arterial Bridge Deck RehabilitationN/A - 250,000250,000- - - - - 500,000 Preservation
cp111958AWS Corridor Imp (Fir St SE to Hemlock St SE)Secured 3,033,8501,000- - - - - - 3,034,850 Roadway
cp102359 Auburn Ave NE & 3rd St NE Pedestrian & Access
Improvements Unsecured 8,77850,000- 300,000- - - - 358,778 Intersection, Signal &
ITS
cpxxxx60M Street SE Corridor (8th St SE to AWS)Unsecured - - - - 1,925,0004,750,000- - 6,675,000 Roadway
cpxxxx61AWS BypassUnsecured - - - - - - 6,000,00054,450,00060,450,000 Roadway
cpxxxx62AWS Streetscape Improvements (SR-18 to M St SE)Unsecured - - - - 1,950,0002,800,000- - 4,750,000 Roadway
cpxxxx6329th St SE/R St SE Intersection ImprovementsUnsecured - - - - 1,800,000- - - 1,800,000 Intersection, Signal &
ITS
cpxxxx64Lea Hill Rd Segment 1 (R St NE to 105th Pl SE) Unsecured - - - 50,0002,450,00010,000,000- - 12,500,000 Roadway
cpxxxx65Lea Hill Rd Segment 2 (105th Pl SE to 112th Ave SE) Unsecured - - - - - 3,500,0008,500,000- 12,000,000 Roadway
cpxxxx66Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE ) Unsecured - - - - 4,000,000- - - 4,000,000 Roadway
cp122267Citywide Traffic Signal Safety ImprovementsSecured 481,9161,000- - - - - - 482,916 Intersection, Signal &
ITS
Total48,484,1119,732,36216,329,61311,169,50533,254,96929,543,17429,403,21294,353,240267,690,036
Appendix A
EDGEWOOD
PIERCECOUNTY
KENT
SUMNER
PACIFIC
ALGONA
KINGCOUNTY
LAKETAPPS
SUPERM ALL
167
18
18
56TH AVE S
6 0 T H S T S E
SE 299TH ST
144TH AVE SE
SE 3 1 8 T H WAY
6 4 T H S T S E
61ST ST S E
SE 315TH PL
M ST SE
37TH ST SE
SE 290TH ST
12TH ST SE
SE 299TH ST
18TH ST N E
A ST SW
4
6
T
H
P
L
S
T
ST
SE
6TH ST NE
4TH ST SE
L
ST
NE
8TH ST SE
EVERGREEN
W A Y SE
26TH ST NE
51 S T P L N E
14TH ST NE
SE 295TH ST
56TH
AVE
S
SE 320TH ST
20TH ST NE
116TH AVE SE
61ST
AV
E
S
M DR NE
51ST S T S E
S 297TH PL
S 292ND ST
28TH ST NE
33RD ST SE
66TH ST S E
50TH ST S E
12TH ST SE
SE 296TH ST
17TH ST SE
26TH ST SE
BENNETT AVE SE
S 292ND ST
S 296TH P L
116TH AVE SE
7 3 R D ST SE
6 3 R D PL S E
SE 316TH ST
S E 314TH PL
56TH ST SE
21ST ST SE
23RD S T SE
67T H S T S E
52ND
PL S
55
T
H
WAY S E
67TH LN SE
SE 316TH PL
S K Y W A Y L N S E
4TH ST N E
19TH PL
SE
55TH
AVE
S
22ND ST NE
PIKE ST SE
SE 307TH PL
43 R D S T NE
130TH
AVE
SE
31ST ST NE
SE 301ST ST
30TH ST NE
57TH ST SE
104TH AVE SE
MAPLE DR SE
24TH ST NE
5 9 TH ST SE
65TH ST SE
55TH ST SE
19TH DR N E
ELM
ST
SE
116TH
AVE
SE
26TH ST SE
28TH ST SE
1 9TH ST SE
LAKE TAPPS DR SE
57TH
PL S
2 6TH ST SE
2ND ST SE
SE 296TH WAY
105TH AVE SE
O
L
I
V
E
A
V
E
SE
16TH ST SE
C ST SE
J ST SE
SE 298TH P L
H
O
W
ARD RD SE
DOGWOOD ST SE
3RD ST NE
9TH ST SE
2ND ST NE
K ST NE
K ST SE
2ND ST NW
2ND ST E
61ST
AV
E
S
OLIVE
AV
E
S
E
1 7 T H S T S E
V
ST
SE
V ST SE
6 2 N D ST SE
6 3 R D ST SE
O ST NE
42ND PL NE
G ST SE
S
DIVISION
ST
S 296TH ST
K ST SE
26TH ST NE
S U P E RMALL DR SW
SE 298TH
P L
7T H S T N E
2ND ST SE
E ST SW
E ST SE
33RD ST S E
55TH ST SE
11TH ST NE
D ST NW
S 310TH ST
S E 321ST PL
64TH ST S E
SE 288TH ST
ELM LN SE
I
S
A
A
C
A
V
E
S
E
S 3 1 4 T H S T
20TH ST NW
7TH ST SE
2N D ST SE
51ST S T N E
15TH ST SE
E MAIN ST
7 2 N D ST SE
1 7 TH ST SE
I PL
NE
E
ST
SE
56TH AVE S
15TH ST SE
SE 307TH PL
QUINCY
AVE
SE
61ST ST SE
30TH ST NE
8TH ST SE
T
ST NW
D PL SE
D ST SE
SE 286TH ST
I PL NE
33RD ST SE
10TH ST NE
N ST SE
22ND ST SE
35TH W AY SE
U
C
T
N
W
3 2 N D S T S E
25TH ST SE
44TH ST NW
R PL NE
12TH ST NE
F ST NW
G ST NW
116TH AVE SE
10TH ST NE
SE 295TH ST
13TH ST SE
SE 310TH ST
PANORAM
A
D
R SE
56TH
A
V
E
S
C ST SE
N ST NE
A
ST NE
SE 293RD S T
K ST NE
K ST NE
SE 288TH PL
107TH
A
V
E
S
E
H ST SE
53RD ST SE
J ST NE
SE 282ND ST
176TH AVE E
L ST SE
S 307TH S T
14TH ST SE
21ST ST SE
T ST SE
SE 300TH WAY
D ST SE
5T H ST N E
5TH ST N E
31ST ST SE
30TH ST SE
D ST SE
3 2ND ST SE
4 9 T H S T N E
S 331ST ST
37TH ST S E
S 288TH ST
S E 3 23RD PL
32ND PL NE32ND ST NE
25TH ST SE
4 9 T H S T NE
TH
O
M
A
S
AVE
SE
50T H S T N E
16TH ST SE
S E 300TH ST
SE 286TH PL
S 296TH ST
S 324TH ST
SE 288TH ST
B PL NW
5 5 TH ST SE
21ST ST SE
4TH ST SW
S 300TH ST
42ND ST NE
S 302ND PL
O ST SE
107TH
PL
SE
S 319TH ST
8TH ST NE
SE 282ND S T
19TH ST S E
W ST NW
SE 43RD ST
30TH ST NW
D ST NE
24 T H S T SE
SE 297TH ST
S 303RD PL
H
S
T
NE
SE 284TH ST
A L P INE DR
SE
65T
H
AVE
S
SE 281ST ST
SE 290TH PL
SE 42ND ST
45T H ST N E
28TH ST SE
WARD AVE SE
OLYMPIC
ST
SE
EVE R G REEN W A Y S E
S 288TH ST
J ST SE
6TH ST NW
57TH ST SE
S
E
289TH ST
3 7 T H W A Y S E
S 312TH S T
SE 285TH ST
42ND ST NE
S 2 9 2 N D S T
2 2ND WAY
N
E
6 9 T H S T S E
20TH ST SE
SE 294TH ST
47TH ST S E
23RD ST SE
51ST ST S E
SE 294TH PL
V
S
T
N
W
17TH ST NE
16TH ST NE
SE 286TH ST
SE 326T H PL
S 318TH ST
G ST SE
RANDALL
AVE
S
E
22ND ST SE
23RD ST SE
24TH ST SE
25TH ST SE
HEATHER
AVE
SE
85TH AVE S
42ND ST NW
SE 282ND ST
LUND RD SW
H ST NW
21ST ST NE
36TH S T SE
SE 312TH
W
A
Y
1
0
2
N
D
A
V
E
S
E
3
7TH
PL SE
29TH ST NW
SE 301ST ST
SE 287TH ST
108TH
AVE
SE
47TH ST SE
SE 284TH STSE 284TH ST
1
0
5
T
H
P
L
S
E
HO
W
A
RD
R
D
S
E
I ST NW
140TH AVE SE
SUPERMALL
AC R D SW
S 287TH ST
FOSTER AVE SE
MOUNTAIN VIEW
DR
S
W
EAST
BLVD
(BOEING)
PAC
IFIC AVE S
J
O
H
N
R
EDDINGTON R D NE
K
ST
SE
MONTEV
I
S
T
A
D
R
SE
F ST NE
109
TH
PL
S
E
127TH
PL
SE
B ST SE
L ST SE
R
ST
NE
55TH
AVE
S
127TH
PL
SE
M ST NE
B ST SE
NATHAN
AVE SE
T ST NE
118T
H
PL
SE
MILL POND DR SE
110TH AVE SE
1 29TH
AVE
SE
ACADEMY
D
R
SE
D ST SE
G
S
T
SE
PERR Y AVE SE
HEMLOCK ST SE
1
1
2
T
H
PL
SE
64TH AVE S
ELM ST SE
52ND AVE S
R ST
NW
ELM
S
T
S
E
V
ST
NW
111TH PL
SE
55TH PL
S
D
S
T
S
E
128TH
PL
SE
R ST NW
6 8 T H S T SE
S
C
E
NIC
D
R
S
E
PIKE ST NE
DOGWOOD ST SE
V
CT SE
RIV ER DR SE
111TH AVE SE
E ST NE
52ND PL S
D ST NE
108TH AVE SE
ALPINE
ST SE
J ST NE
L ST NE
L
ST
SE
5
8T
H
A
V
E
S
D ST SE
C
S
T
SE
C ST SE
E ST NE
1ST S T NE
108TH AVE SE
58TH AVE S
QUINCY
AVE
S
E
69TH S T S E
G ST SW
51ST AVE S
SE 299TH P L
FIR ST SE
D ST SE
GINKGO ST
SE
J ST NE
E ST SE
B ST SE
G ST SE
O ST NE
PIKE ST NE
HI
G
H
LAND DR
SE
59TH
AV
E
S
U
ST
S
E
I ST SE
N ST NE
H ST SE
L ST NE
E
V
E
R
G
R
E
E
N
W
A
Y
S
E
Z
ST
SE
R PL SE
17TH DR SE
C ST NE
H ST NE
54TH AVE S
W
ST
NW
E ST NE
57TH P L SE
G ST NE
TER
R
ACE
VIEW
LN
SE
A ST E
SUPERMALL WAY SW
PEARL AVE SE
F ST SE
H ST SE
PIKE ST NW
142ND
AVE S E
A A B Y DR NW
1
0
4
T
H
P
L
S
E
148TH AVE SE
SE 295TH ST
54TH AVE S
55TH AVE S
BRIDGET AVE SE
PERIMETER RD SW
U
S
T
N
W
C ST NE
RIV E R V I E W DR NE
CLAY ST NW
FRONTAGE
RD
118TH AVE SE
M ST NW
GRE
E
N RIVER ACRD
S E
STUCK RIVER DR SE
51ST AVE S
AUBURN
W
AY
S
PEASLEY C A NYON RD S
8T H ST N E
K
E
R
S
E
Y
W
A
Y
S
E
AUBUR N-BLACK DIAMOND RD SE
P
E
A
S
L
E
Y
C
A
N
Y
O
N
RD
S
E M A I N S T
A ST SE
I
ST
NE
112TH AVE SE
4T H ST SE
SE 281ST ST
TERRA
C
E
DR
NW
W MAIN ST
R ST SE
A ST NW
EA
S
T VA
L
L
EY
H
W
Y E
R ST SE
AUBURN
WAY
N
S 316TH ST
SE 304TH ST
L
A
K
E
T
A
PPS PKWY SE
29TH ST SE
124TH AVE SE
SE 304TH ST
SE 312TH ST
15TH ST NW
RIVERW A L K DR S E
ELLINGSON RD SW
SE 304TH ST
SE 312TH ST
WEST
VALLEY
HWY
N
R
ST
S
E
15TH ST SW
SE 320TH ST321ST ST S
15TH ST NW
3 7T H S T NW
15TH ST NE
LEA HILL R D S E
SE 3 0 4 T H ST
BOUNDARY BLVD SW
S 277TH ST
SE
304TH W A Y
D
ST
NE
A
S
T
N
W
A
ST
SE
WEST VALLEY
HWY
N
51ST AVE S
41ST ST S E
C
ST
SW
132ND
AVE
SE
132ND AVE SE
WEST VALLEY
HWY
S
AUBURN WAY N
M ST SE
M ST SE
112TH AVE SE
112TH AVE SE
A ST NE
B ST NW
LAKELAND
HIL
L
S
W
A
Y
S
E
B ST NW
R ST SE
M ST NE
B
S
T
N
W
ORAVETZ RD SE
D
ST
NW
C ST NW
EMERALD
DOWNS
DR
NW
104TH
AVE
SE
12TH ST E
S
2
7
2
N
D
WAY
M
I
L
I
T
A
R
Y
R
D
S
16 TH S T E
AUBURN-BLACK DIA M O N D RD S E
9TH ST E
214TH AVE E
A
U
B
U
RN
WAY
N
S 288TH ST
SUMNER-TAPPS
H
W
Y
E
FOR E S T C ANYON RD E
M
I
L
I
T
A
R
Y
R
D
S
A
U
B
U
R
N
-E
N
U
M
C
L
A
W
RD S
WEST
VA
LLEY
H
W
Y
S
MILITARY RD S
182ND
AVE
E
2
1
0
T
H
A
V
E
E
142ND AVE E
J O VIT A B L V D E
108TH AVE SE
S 277TH ST
116TH AVE SE
WEST VALLEY HWY NW
PACIFIC AVE S
S E 2 7 4 T H S T
124TH AVE SE
SE 272ND ST
S 272ND ST
STEWART RD SE
M
I
L
I
T
A
R
Y
R
D
S
SE 272ND ST
SE KENT-KANGLEY
R
D
STEWART RD SW 8TH ST E
S E 2 7 4 T H S T
24TH ST E
ELLINGSON RD SW
WEST
VA
L
L
E
Y
H
W
Y
68TH
AVE
S
38TH
AVE
S
WEST
VALLEY
H
W
Y
S
PACIFIC AVE S
136TH AVE E
140TH AVE E
W
ES
T
V
A
L
L
E
Y
HWY
E
WEST
VALLEY
HWY
S
EAST
VALLEY
H
W
Y
CENTRAL AVE S
VALENTINE AVE SE
S 277TH S T
53
64
59
62
6014
8 19
21
44 52
65
38
51
41
41
1 15 39
582
12
11
16
42
10
3
4
7
9
5
40
43
6
55
66
61
25
25
47
46
49
54
1817
63
20
22
27
33
33
48
23
56
24
Information shown is for general reference purposes only and does not necessarily represent exact geographic or cartographic data as mapped. The City of Auburn makes no warranty as to its accuracy.
Map ID: 4246Printed On: 05/24/13
City of Auburn 2014 - 2019 Transportation Improvement Program (TIP)
0 1,100 2,200 3,300 4,400 5,500
FEETIntersection Im provem ents
Non-Motorized Improvements
Prelim Eng and Mis c Im provements
Preservation
Roadway Improvements
Signal & ITS Projects
City of Auburn
Parks
Water Features
Appendix B
1S T S T NE
A ST SW
4TH ST N E
2ND ST NE
1ST ST SW
2ND ST SW
2ND ST NW2ND ST NW 2ND ST N E
1ST ST NE
2ND ST S E
B
S
T
NE
1ST ST SW
1ST ST NW
1ST ST SE
5TH ST NE
A ST SW
S DIVISION ST
3RD ST NE
N DIVISION ST
4TH ST SW
A ST NE
D
ST
NW
B ST NE
N DIVISION ST
1ST ST NE
2ND ST SE
6TH ST N E
D ST SE
PA R K AV E N E
D ST SW
TRANSIT
RD
SW
D ST NE
D ST NE
A ST SW
A ST NE
D ST NW
AUBURN
AVE
NE
A ST SE
AUBURN WAY S
3RD ST NE
W MAIN ST E M AIN S T
4T H ST SE
3RD ST NW
A ST NW
A ST NW
CROSS ST SE
A
U
BU
R
N
WAY
N
C
S
T
S
W
C
ST
SW
A ST NW
C
S T SW
C ST NW 598
19
21
21
44
1
3
33