HomeMy WebLinkAbout2014 Active Projects Map.pdfC524A
C524A
C524A
C410A
CP0767
C410A
CP1114
CPXXXX
CPXXXX
CPXXXX
CP1107
CP1115
CP1118
CP1122
CP1202
CP1207
CP1207
CP1207
CP1024
CP1208
CP1208
CP1208
CP1208CP1208
CP1208
CP1208
CP1208
CP1208
CP1208
CP1208
C512A
CP1219
CP
1
2
1
9
CP1219
CP0765
CPXXXX
CPXXXX
CPXXXX
CPXXXX
CPXXXX
CP1222 CP1222
CP1222
CP1222
CP1222
CP1222CP1222
CP1222
CP1222
CP1222
CP1222
CP1222
CP1222
CP1224CP1224
CP1224
CP1224
CP1302
C
P
1
3
0
2
CP1302
CP1302
CP1302 CP1302
CP1302
CP1302
CP1302
CP
1
3
0
2
CP1302
CP
1
3
0
2
CP
1
3
0
2
CP1302
CP1302
CP
1
2
2
5
CP
1
2
2
5
CP1119CP1218
C207A
CP1217
C222A
C229A
C201A
CP1120
CP
1
1
2
0
C
P
0
9
1
2
C
P
0
9
1
2
C
P
0
9
1
2
CP0912
CP0912
CP1304
CP1104
CP1301
CP0915
CP1302
CP1109
CP1308 CP1308
CP1308
CP1308
CP1308
CP1308
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A C524A
C524A
C524A
C524A
C524A
C524A
C524A C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524A
C524AC524A
C524A
C524A
CP0909
CP1307
CP1307
CP1307
CP1312
CP1312
CP1312
CP1312
CP1316
CP1302
CP1308
CP1302
CP
X
X
X
X
2014 ACTIVE CAPITAL IMPROVEMENT PROJECTS
LEGEND:
Construction Design
SEWER PROJECTSTRANSPORTATION PROJECTS WATER PROJECTS STORM PROJECTS MISC PROJECTS
Construction Design Construction Design Construction Design Construction Design
ACTIVE PROJECTS
C524A
SCADA
Systems
Improvements
C524A SCADA Systems
Improvements
C524A SCADA Systems
Improvements
CP1107
Fulmer Wellfield
Improvement
Project
CP1122 30th St NE Storm
Improvement - Phase 1
CP1202
Auburn Way So.
Flooding
Improvements-Phase 2
CP1207 D St Utilities
Improvements
CP1207 D St Utilities
Improvements
CP1207 D St Utilities
Improvements
CP1208 Sewer Pump Station
Improvement
CP1104
104th Street and 8th
ST NE Intersection
Improvement
C201A M ST SE
Underpass Project
ACTIVE PROJECTS
C410A 277th Wetland
Mitigation Monitoring
CP0767
Mohawk Plastic
Wetland Mitigation
Monitoring
CP1114
12th St SE & Auburn
Way SO.
Intersection Impt.
CP1118 AWS Pedestrian Impt.
Dogwood St SE to
Fir St SE
CP1119
AWS Corridor Impt.
Fir St SE to
Hemlock St SE
CP1120 Lea Hill Safe
Routes to School
CP1024 A.W.S. & M St SE
Intersection Impt.
Print Date: 01/15/2014
File Name:
M:\Capital Projects\Active Capital Projects.dwg
CP1115
City Hall
North Plaza
Improvements
C512A Well 4 Improvement
CP1219 Valley AC Water
Replacement
CP0765
Lakeland Hills
Reservoir
Improvements
CP1222 City Wide Traffic
Signal Repair
CP1301 2013 Sidewalk
Repair
CP1224 2013 Local Street
Reconstruction
CP1302
2013 Pavement
Patching, Chip Seal
and Overlay Project
CP1225
WVH Preservation
15th St NW to 37th
St NW
CP1218
AWS - Muckelshoot
Plaza to Dogwood St
SE
C207A
A St NW Wetland
Mitigation Monitoring
& Reporting
C222A
S 277th St Corridor &
Non-Motorized
Improvements
C229A BNSF / EVH Ped.
Undercrossing
CP0912 City Wide
Guardrail
CP1304 37th & B St NW
Pre - Signal
CP1109
2011 Storm Repair
& Replacement
Phase 2
CP1308 BNSF Utility
Crossings
CP1308 BNSF Utility
Crossings
CP1308 BNSF Utility
Crossings
CP0915 Well 1 - On Site
Improvements
CP0909 Academy Booster
Pump Station
CP1307 Control Structure
Installation
CP1312 Storm Repair &
Replacement
CP1316 East Ridge Manor
Storm Improvements
CPXXXX Annual Storm Pond
and Ditch Cleaning