HomeMy WebLinkAbout2007-01-01 Fee ScheduleEXHIBIT A
CITY OF AUBURN FEE SCHEDULE
FEES FOR CITY PERMITS AND ACTIONS
Effective January 1, 2007
A. Planning & Land Use Fees, Application Fees (Per Ordinance No. 5707, amended by
Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797, Resolution No. 3953,
Resolution No. 4070 and Resolution No. 4117)
Applications for any action identified below shall not be accepted for filing until the fees
per the below schedule have been paid to the City.
Type Fee
Shoreline substantial development $1,100.00
Street and alley vacations $750.00
Short plat application or amendment $1,250.00
Short plat modification $250.00/request
Boundary Line Adjustment $350.00 residential
$675.00 non-residential
Rezone (map amendment) $1,700.00
Zoning Code text amendment $1000.00
Conditional use permits $825.00 residential
$1,100.00 all other uses
Conditional use permits -major adjustment $400.00 residential
$535.00 commercial
Mining permits $3,500.00
Binding site plan $1,100.00 + $60/lot
Preliminary plats or plat alteration $1,100.00 and $60.00 per lot
Plat modification $250.00/request
Final plats $1,250.00 and $35.00 per lot
Variance $250.00 each single family lot
$575.00 all other
Minor Hearing Examiner decisions not listed $500.00
Hearing Examiner Decision Appeal $250.00
Administrative temporary use permits $100.00
PUD -major adjustment $2,500.00
Lot line adjustments $215.00 single family residential lots
$535.00 other
Administrative use permits $850.00
Pre-application meeting $250; fee will be applied towards
any appli cation made w/in 6 months.
Address assignment $100/assigned address
Adult Family Home inspection $150.00
Special home occupation permits $250.00
Preliminary Site Plan approval (non-PUD) $1,000.00
Page 1 January 1, 2007
Environmental checklists
Review of additional required studies
3~d party reviews
Environmental Impact Statement
Appeal of environmental determination
3-way outside utility ext. agreement
Critical Areas Ordinance (CAO)
Reasonable Use Determination
Variance -administrative
Variance -hearing examiner
Development Agreement
Water/Sewer Certificate
Misc. Administrative Decisions (i.e. sign area
deviation, written interpretations, etc.)
Appeal of Administrative Decision (building
code, planning director decisions, etc.)
Three party outside utility extension agreement
site specific review.
Fee for Posting Public Notices
(per Ch, 1.27 ACC)
$775.00 plus actual cost for
preparation of draft & final statements
including labor materials, mailing &
other actual costs relating to the
drafting & circulating of the E.I.S.
$250/study
Actual cost
$775 + costs
$250.00
$1,100.00 + costs
$250.00
$150.00
$250.00
$2,200.00
+ $60.00 per acre
$300.00
$150.00
$250.00 (refunded if overturned)
$1,000 plus the City's actual
costs in performing under the
terms of the agreement as
negotiated between the parties.
Type of Fee Replacement
Mounting Board Per Board Cost, Per Board
Type I $25.00 $55.00
Type II $35.00 $80.00
Type III $55.00 $105.55
Sign Permits (per Ch. 18.56 ACC)
Unless exempt by Ch. 18.56 ACC, the fee shall accompany each application for a sign
permit. The amount of the fee shall be based upon the value of the sign pursuant to
Table 1-A, Ch. 1, 1997, International Building Code.
Additional Sign Fees
Appeals and variance applications $215.00
Temporary sign permits (issued by hearing examiner) $105.00
Page 2 January 1, 2007
Comprehensive Plan Text Amendments* $550.00
Comprehensive Plan Map Amendments* $2,000 (incl. rezoning)
*Fees for amendments to text or maps of the Comprehensive Plan apply only where an
applicant seeks an amendment affecting specific properties, rather than the City generally or
property within the City generally.
Zoning Certification letter $50.00 (residential)
$100.00 (non-residential)
Books, Maps, Materials
Comprehensive Plan $20.00
Critical Areas Ordinance $3.00
Downtown Plan $24.00
Downtown Plan Appendices $24.00
Land Division Ordinance $3.00
SEPA Ordinance $3.00
Wetlands Map $5.00
Zoning Map $5.00
Zoning Ordinance $10.00
Prices for printed materials
do not include tax
Page 3 January 1, 2007
B. Auburn Municipal Airport Lease Fees (Per Ordinance No. 5707, amended by
Ordinance No. 5715 and Ordinance No. 5819, and amended by Resolution No. 3784,
Resolution No. 3841, Resolution No. 3953 and Resolution No. 4117)
Type
Open single
Open twin
Closed R-2
Closed R-9 & 10
Outside tiedowns
Storage rows 2-7
Storage units (185 sq. ft.
Storage units (298 sq. ft.)
Storage units (380 sq. ft.
Storage units (430 sq. ft.
- buildings 9, 10)
-buildings 9, 10)
-buildings 9, 10)
Lease Rate
$169.40
$ 195.84
$252.01
$357.52
$58.33
$98.03
$89.58
$105.37
$134.37
$156.76
Hangar rows 9 and 10 west end hangars have an additional 298 square feet each. There shall
be an additional $100.00 per month surcharge for the additional space.
A security surcharge of $3.00 per month is charged, in addition to the base monthly rental
fees provided in this section, for each tie-down, each hangar door and each storage rental area,
which security surcharge fees are to be used for the provision of increased security at the
Auburn Municipal Airport (approved by Ordinance No. 5500 on January 16, 2001). For the
purposes hereof, each tie-down consists of the structures/facilities necessary to accommodate
one (1) regular sized light aircraft. Furthermore, the hangar doors to which the security
surcharge applies includes all hangars located at the Auburn Municipal Airport, including those
hangars built on land owned by the City but leased to private parties, and those hangars owned
in a condominium type ownership.
The above lease and security surcharge amounts are subject to applicable leasehold taxes,
which shall be paid by the tenant. The total charges, including the above lease rates plus lease
hold tax and surcharge shall be reflected in monthly billing rates. Tenants shall be given notice
as required by Ordinance or lease agreements. The Airport Lease rates shall be effective
January 1, 2007.
Payments.
Payments are due on the first of each month, past due as of the Stn and late as of the 15tH
Payments not received by the 15tH incur a $10.00 late fee. Payments not received after 30 days
from the due date incur an additional $25.00 delinquency fee.
Automatic gate electronic cards.
One automatic gate electronic card will be issued to each tenant free of charge. Any additional
electronic cards requested by a tenant are subject to a $25.00 refundable deposit charge. A
$25.00 replacement fee will be assessed against the tenant for all lost or damaged electronic
cards. All electronic cards must be returned to the airport at the time of lease expiration.
Page 4 January 1, 2007
Each lease shall include an initial payment of first and last months' rent plus a damage
deposit in the amount of two times the monthly base rate. Each lease agreement shall
also include terms that authorize the city to apply the damage deposit to outstanding
charges on termination.
-----------------------------------------------------------------------------------
Page 5 January 1, 2007
C. Permit Fees (Resolution No. 3773, amended by Resolution No. 3797,
Resolution No. 3818, and Resolution No. 3953)
Building Permit Fees
The fee for each International Building Code, International Residential Code,
Washington State Energy Code or Washington State Indoor Air Quality Code building
permit shall be as set forth in Table 1-A, below.
Tahle 1-A RTJTLDiNG PFR1Vi1T FEES
TOTAL VALUATION FEE
$1.00 to $500.00 $30.00
$501.00 to $2,000.00 $30.OOfor the first $500.00 plus $6.00 for each additional $100.00, or fraction thereof, to and
includin $2,000.00
$2,001.00 to $25,000.00 $107.00 for the first $2,000.00 plus $18.00 for each additional $1,000.00, or traction thereof, to and
includin $25,000.00
$25,001.00 to $50,000.00 $510.00 for the trst $25,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and
includin $50,000.00
$50,001.00 to $100,000.00 $845.00 for the first $50,000.00 plus $10.00 for each additional $1,000.00, or fraction thereof, to and
includin $100,000.00
$100,001.00 to $500,000.00 $1,308.00 for the first $100,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof, to
and includin $500,000.00
$500,001.00 to $1,000,000.00 $4,604.00 for the first $500,000.00 plus $8.00 for each additional $1,000.00, or fraction thereof, to
and includin $1,000,000.00
$1,000,000.00 and up $8,209.00 for the first $1,000,000.00 plus $6.00 for each additional $1,000.00 or fraction
thereof
Other Inspections and Fees:
I .Inspections outside of normal business hours .................................................................................................................... $59.00 per Itourl
(minimum charge -two hours)
2. Reinspection tees assessed under provisions of Section 109.4.13 ...................................................................................... $59.00 per hourl
3. Inspections for which no fee is specitically indicated ........................................................................................................ $59.00 per hourl
(minimum charge -one half hour)
4. Additional plan review required by changes, additions or revisions to plans ..................................................................... $59.00 per hour
(minimmn charge -one half hour)
5. For use of outside consultants for plan checking and inspections, or both .............................................................................. Actual costsz
br the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly
wages and fringe benefits of the employees involved.
zActual costs include administrative and overhead costs.
Mechanical Permit Fees
The fee for each permit issued under provisions of the International Mechanical Code,
International Fuel Gas Code, NFPA 54 (National Fuel Gas Code), NFPA 58 (Liquefied
Petroleum Gas Code), or the mechanical device provisions of the International
Residential Code shall be as set forth in Table 2-A, below. For new single-family
dwellings a flat rate permit fee of $173.00 may be charged in lieu of fees as prescribed
in Table 2-A.
Page 6 January 1, 2007
Table 2-A MECHANICAL PERMIT FEES
Permit Issuance and Heaters
1. For the issuance of each mechanical penniL ...................................................................................................................................... $25.00
2. For issuing each supplemental permit for which the original permit has not expired, been canceled or 6naled ................................. $9.00
Unit Fec Schedule
(Note: The fol/owing do not include permit-issuing fee.)
1. Furnaces
For the installation or relocation of forced-air orgravity-type furnace or burner, including ducts and vents
attached to such appliance up to and including 1000,000 Btu/h (29.3kW) ...................................................................................... $16.00
For the installation or relocation of forced-air or gravity-type furnace or burner, including ducts and vents
attached to such appliance over 100,000 Btu/h (29.3kW) ............................................................................................................... $20.00
For the installation or relocation of each floor furnace, including vent ........................................................................................... $16.00
For the installation or relocation of each suspended beater, recessed wall heater or floor-mounted unit heater ............................... $16.00
2. Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit ................. $9.00
3. Repairs or Additions
For the repair of, the alteration of, or addition to each heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation
of controls regulated by the Mechanical Code ................................................................................................................................. $15.00
4. I3oilcrs, Compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW) or each absorption
system to and including 100,000 Btu/h (29.3 kW) .......................................................................................................................... $16.00
For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) to and
including 15 horsepower (52.7 kW),or each absorption system over 100,000 Btu/h (29.3 kW) to and
including 500,000 Btu/h (146.6 kW) .............................................................................................................................................. $29.00
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7k W) to and including
30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including
1,000,000 Btu/h (293.IkW) .........................:.................................................................................................................................. $39.00
For the installation or relocation of each boiler or compressor over 30 horsepower (1O5.5kW) to and
including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to
and including 1,750,000 Btu/h (512.9 kW) ..................................................................................................................................... $>8.00
For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or
each absorption system over ].750.000 Btu/Ir (512.9 kW) .............................................................................................................. $96.00
5. Air Ilandlers
Por each air handling unit to and including 10,000 cubic feet per minute (cfin) (4719 L/s), including ducts
attached thereto ............................................................................................................................................................................... $12.00
Note: This fee does not apply to an air-handling unit which is a portion of a, factory-assembled appliance, cooling system,
evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code.
For each air-handling unit over 10,000 cfin (4719 L/s) ................................................................................................................... $20.00
6. Evaporative Coolers
For each evaporative cooler other than a portable type ................................................................................................................... $12.00
7. Ventilation and Exhaust
For each ventilation fan connected to a single duct ............................................................................................................................ $9.00
For each ventilation system which is not a portion of any heating orair-conditioning system authorized by a permit ................... $12.00
For the installation of each hood which is served by a mechanical exhaust, including the ducts for each hood .............................. $12.00
8. Incinerators
Page 7 January 1, 2007
For the installation or relocation of each domestic-type incinerator ................................................................................................ $20.00
For the installation or relocation of each commercial or industrial-type incinerator ....................................................................... $16.00
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other
appliance categories or for which no other fee is listed in the table _ .............................................................................................. $12.00
Other Inspections and Fees:
I .Inspections outside of normal business hours, per hour (minimum charge -- rivo hours) .................................................................. $59.00
2. Reinspeclion fees assessed under provisions of Section 109.4.13 ..................................................................................................... $59.00
3. Inspections for which no fee is specifically indicated, per hour (minimum charge -- one-half hour) ................................................ $59.00
4. Additional plan review required by changes, additions or revisions to plans or to plans for which
an initial review has been completed (minimum charge -- one-half hour) ........................................................................................ $59.00
*Or the total cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment,
hourly wages and fringe benefits of the employees involved.
Plumbing Code Permit Fees
The fee for each permit issued under the provisions of the International Plumbing Code
shall be as set forth in Table 3-A, below, and adjusted for inflationary factors using the
Seattle Consumer Price Index retroactively from year 1997. For new single-family
dwellings a flat rate permit fee of $173.00 may be charged in lieu of fees as prescribed
in Table 3-A.
----------------------------------------------------------------------------------------------------------------------------------
Page 8 January 1, 2007
Table 3-A PLUMBING PERMIT FEES
Permit Issuance
I . For issuing each permit ................................................................................................................................................ $22.00
2. For issuing each supplemental pennit ........................................................................................................................... $12.00
Unit Fec Schedule (in addition to items 1 and 2 above)
1. For each additional plumbing fixture on one trap or a set of fixtures on one trap
(including water, drainage piping and backflow protection therefore) ..........................................:.................................. $9.00
2. For each building sewer and each trailer park sewer ...................................................................................................... $17.00
3. Rainwater systems -per drain (inside bttilding) .............................................................................................................. $9.00
4. For each water heater and/or vent ................................................................................................................................... $9.00
5. For each industrial waste pretreatment interceptor including its trap and vent,
except kitchen-type grease interceptors functioning as fixture traps ................................................................. .............. $9.00
6. For each installation, alteration or repair or water piping and/or water treatment, each ..................................... .............. $9.00
7. For each repair or alteration of a drainage or vent piping, each fixture .............................................................. .............. $9.00
8. For each lawn sprinkler system on any one meter including backFlow protection devices therefore ................. ...............$9.00
9. For atmospheric-type vacuum breakers not included in item 12:
1 to 5 ..........................................................................:................................................................... $6.00 over >, each
................................................... .............. $2.00
10. For each backflow protective device other than atmospheric type vacuum breakers:
2 inch (51 mm) diameter and smaller .........................................................................................................._. .............. $9.00
over 2 inch (51 mm) diameter ......................... $17.001 1. For initial installation and testing for a reclaimed water system
...... ............................................................................................................................................................................. ............ $33.00
12. For each annual cross-connection testing of a reclaimed waster system (excluding initial test) ........................ ............ $33.00
13. For each medical gas piping system serving one to tive inlet(s)/outlet(s) for a specific gas ............................. .............$53.00
14. For each additional medical gas inlet(s)/outlet(s) .............................................................................................. ...............$6.00
Other inspections and Fees
I . Inspections outside of normal business hours ............................................................................................................... $59.00
2. Reinspection fee ........................................................................................................................................................... $59.00
3. Inspections for which no fee is specitically indicated .................................................................................................. $59.00
4. Additional plan review required by changes, additions or
revisions to approved plans (minimum charge -one-half hour) .................................................................................. $59.000
`Per hour for each hour worked nr the total hourly cost to the jurisdiction. whichever is ereater. Tltis cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits ofall the employees involved.
Fire Code Permit Fees
The fee for each activity requiring a permit issued under the provisions the International
Fire Code Section 105.6 shall be as set at $59.00 per hour with a minimum charge of
$59.00. There shall be no charge imposed for routine annual fire prevention inspections.
Fees
Permit fees shall be assessed in accordance with this section. Fees specified shall be
adjusted for inflation each year based upon the Seattle Consumer Price Index. Fees
shall be rounded down to nearest whole dollar.
Page 9 January 1, 2007
Appeal Fees
The fee for appeals of codes adopted pursuant to ACC chapter 15 shall be $103.00.
Plan Review Fees
When submitted documents are required by section 106.3 of the Construction
Administrative Code, a plan review fee shall be paid at the time of submitting the
submittal documents for plan review. Said plan review fee shall be 65 percent of the
building permit fee as shown in Table 1-A. The plan review fees specified in this section
are separate fees from the permit fees and in addition to permit fees.
Temporary Certificate of Occupancy Fees.
There shall be a fee equal to ten percent of the building permit fee for issuance of a
temporary certificate of occupancy.
Fee schedule for administrative procedures and miscellaneous inspections.
In addition to any other fees specified in this chapter, there shall be a fee schedule for
certain administrative procedures not otherwise included as set forth in the following
schedule of fees:
Demolition, permit and inspections Per Table 1-A
Relocation (pre-inspection) Per Table 1-A
Housing inspection Actual city cost, minimum $21.00
Change of use Per Table 1-A
Fire sprinklers, first 10 heads $155.00
Fire sprinklers, additional heads $0.75 each
Fire alarm systems, first 10 devices $155.00
Fire alarm systems, additional devices $5.00 each
-----------------------------------------------------------------------------------------------------------------------
Page 10 January 1, 2007
D. Police Department Fees (Per Ordinance No. 5715 amended by Ordinance No. 5819,
Resolution No. 3797, Resolution No. 3953 and Resolution No. 4117.)
Type Fees
Police Report/Collision Report $12.00
(fee not charged where requested
by victim or party involved)
Fingerprinting Fees $12.00
(fee not charged where taking of
fingerprints is required by the city)
Health Services $6.50
(to be collected from persons confined in the
Auburn City Jail who request health services)
Jail Inmate Booking Fee (per booking) As set by t he Court
Electronic Home Monitoring (per inmate, per day) $15.00
Alarm Registration and Service charges.
Service charges will be assessed by the city for excessive false alarms
during the registration year as follows:
Type of Fee Amount.
Registration fee (one time fee) $18.00
Late registration fee penalty $52.00
Appeal hearing cancellation fee $11.00
False Alarms $52.50
-----------------------------------------------------------------------
Page 11 January 1, 2007
E. City Clerk Fees (Per Ordinance No. 5715 and amended by Ordinance No. 5819
and Resolution No. 3797.)
Type Fees
Fees for public records -Collection.
Noncertified copies of public records $0.15 per page
where no special search or documentation is required)
Certified copies of public records $4.00 per page
Noncertified copies of public records $4.00 for 15t page
where a search or documentation is required) and $2.00 each add'I page
Fees for Auburn City Code book and supplements.
Copy of Auburn City Code book $100.00 per code book
(with latest supplement)
Supplements to the Auburn City Code book $11.00 per copy.
Page 12 January 1, 2007
F. City Cemetery Fees (Amended by Resolution No. 3797, Resolution No. 3953, and
Resolution No. 4027, Resolution No. 4103 and Resolution No. 4117.)
Type Fees
GRAVES
Section U, V and W $1,895.00
All other adult graves $1,495.00
Child's Place $295.00
Double Depth (includes 2 plots/2 liners) W $3,495.00
Section U and V (upright) $3,595.00
GROUND CREMATION PLOTS
Centennial Urn Garden (single) $495.00
Centennial Urn Garden (companion) $990.00
Section 9 Upright Section Urn Plots (6 urns) $3,195.00
NICHES
Mausoleum (top rows only)
Single $480.00
Double $735.00
Centennial Columbarium II (1 or 2 urns)
Row 1 Top SOLD
Row 2 Middle SOLD
Row 3 Middle $1,695.00
Row 4 Bottom $1, 545.00
Chapel of Memories
12 x 12 Glass Front Interior $2,195.00 - $2,895.00
18 x 12 Glass Front Interior $3,295.00 - $4,295.00
24 x 12 Glass Front Interior $5,895.00 - $6,895.00
Chapel of Memories
12 x 12 Exterior Granite Front Rows 1-7-8 $1,895.00
12 x 12 Exterior Granite Front Rows 2-3 $2,295.00
12 x 12 Exterior Granite Front Rows 4-5-6 $2,695.00
EXTENDED LAND USE $495.00
MEMORIAL PLAQUE - $125.00 additional for inscription $295.00
SERVICES
Opening and Closing -Ground Burials
Liner/Vault $895.00
Installation fee for vaults and liners $300.00
Page 13 January 1, 2007
Children's Place $230.00
Opening and Closing -Cremation
Cremation Plot $375.00
Niche - $125.00 for additional inscription + tax $375.00
Opening and Closing -Entombment + 125 Inscription + tax $615.00
Set up charge -full burial $175.00
Marker Services
Flat Grass:
Setting Fee $225.00 + tax
Resetting Fee
Upright:
Setting Fee $395,00 + tax
Resetting Fee
Vase Setting Fee $40.00 + tax
Recording Fee $25.00
Overtime Charge (per hour) $125.00
Saturday Service Fee
Full Internment $395.00
Cremation $295.00
MATERIALS
Flower Vases: (prices exclude vase setting fee)
Standard $95.00 + tax
Deluxe Cast Zinc $125.00 + tax
Deluxe Wall $125.00 + tax
Liners:
Concrete Liner
Mountain View Vault $495.00 + tax
Double Depth
Infant
Urn Encasement $195.00 + tax
Page 14 January 1, 2007
G. Fire Department Fees (Per Ordinance No. 5715 and amended by Ordinance No. 5819,
Resolution No. 3797 and Resolution No. 3953.)
Type Fees
Fire Code Appeals (ACC 15.36.020) $520.00
Permit Fees (per IFC § 105)**
Initial permit $63.00
Annual renewal $63.00
Inspection Fees (per IFC § 103, Ch 15.38 ACC)**
Initial inspection No Charge
1st re-inspection No Charge
2nd re-inspection $47.00
Any subsequent (after 2nd) re-inspection $104.00
After Hours Fee $57.00 per hour (2 hour min.)
(for fire inspections or permit work
required to occur outside of normal
business hours)
Fire Ambulance transport fee: $658.00 base rate
Fire Ambulance transport mileage fee: $13.50 per mile
~~ For permits and inspections not covered by the
International Building Code or building code fee
schedule/table.
Page 15 January 1, 2007
H. Public Works Department Fees
Transportation Impact Fee Rate Schedule (Per Ordinance No. 5763 as amended by
Resolution No. 3953, Ordinance No. 6005 and Resolution No. 4103..)
Unit of Basic Impact
Land Use ITE Land Use Code Measure Trip Rate Fee Rate
Residential
SF residential 210 dwelling 1.01 $3,137.90
MF residential 220, 221, 230, 233 dwelling 0.62 $2,036.31
Senior Housing 251 dwelling 0.26 $646.22
Mobile home in MH pack 240 dwelling 0.59 $1,466.43
Commercial -Services
Drive-in bank 912 sf/GFA 45.74 $36.54
Day care center 565 sf/GFA 13.18 $17.55
Hotel 310 room 0.59 $2,094.89
Motel 320 room 0.47 $1,668.81
Library 590 sf/GFA 7.09 $8.03
Post office 732 sf/GFA 10.89 $12.33
Service station 944 VFP 13.86 $8,366.08
Service station w/minimart 945 sf/GFA 96.37 $43.63
Auto care center 942 sf/GLA 3.38 $4.62
Movie theater 444, 445 seat 0.07 $121.48
Health club 492, 493 sf/GFA 4.05 $8.36
Commercial -Institutional
Elementary school 520
Middle school/jr. high 522
High school 530
Assisted Living, Nursing H ome 254, 620
Church 560
Hospital 610
Commercial -Restaurant
Restaurant
High turnover restaurant
Fast food restaurant
Espresso Stand drive thru
Commercial -Retail Shopping
Shopping center
Supermarket
sf/GFA 1.19 $1.44
sf/GFA 1.19 $2.28
sf/GFA 0.97 $2.55
bed 0.22 $546.80
sf/GFA 0.66 $2.17
sf/GFA 1.18 $4.19
931 sf/GFA 7.49 $18.09
932 sf/GFA 10.92 $17.84
934 sf/GFA 34.84 $30.93
NA site 6.00 $2,130.40
820 sf/GLA 3.75 $4.89
850 sf/GFA 10.45 $14.61
Page 16
January 1, 2007
Convenience market 851 sf/GFA 52.41 $27.22
Freestanding discount store 8l 3, 815 sf/GFA 4.53 $5.91
861, 863, 864
Hardware/paint store 8l 6 sf/GFA 4.84 $2.92
Specialty retail center 814 sf/GFA 2.71 $2.05
Furniture store 890 sf/GFA 0.46 $0.42
Car sales -New 841 sf/GFA 2.64 $8.62
Car sales -Used NA spaced 0.28 $914.65
Commercial -Office
General Office 710, 715, 750 sf/GFA 1.49 $6.07
Medical office 720. sf/GFA 3.72 $11.89
Industrial
Light industry/ manufacturing 110, 140 sf/GFA 0.86 $4.87
Heavy industry 120 sf/GFA 0.68 $4.31
Industrial park 130 sf/GFA 0.86 $4.87
Mini-warehouse/storage 151 sf/GFA 0.21 $1.09
Notes:
A. Basic trip rates are based on the ITE Trip Generation Manual, 7th Edition.
B. Impact fee rate calculation is based upon the following methodology:
- Basic Trip Rate = PM Peak Hour Trip Generation (per unit of measure)
- Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x Per Trip Fee/(divide by)
1,000 for rate der square foot (where applicable) =Impact Fee Rate (per unit of measure)
C. For land uses not specifically identified here, trip generation rates could be derived from ITE or a
special study by the applicant.
D. sf /GFA= Square feet Gross Floor Area; sf/GLA= Square Feet Gross Leasable Area; VFP=Vehicle
Fueling Position.
Footnotes:
~ Space is individual vehicle sales space: 70 vehicles for sale = 70 vehicle spaces.
Page 17 January 1, 2007
Truck-Dependant Land Use Supplementary Transportation Impact Fee Rate Schedule
(Per Resolution No. 4122.)
Land Use
ITE Land Use Code
Unit of Measure Truck Trip
Rate Impact Fee
Rate ( er s
Lzdustrial
Li ht Industr /Manufacturin 110,130, 140 sf/GFA 0.06 $ 0.10
Hea Industr 120 sf/GFA 0.04 $ 0.08
Commercial-Retai[
Sho in Center 820 sf/GLA O.OI $ 0.01
Su ermarket 850 sf/GFA 0.33 $ 0.60
Free-Standin Discount Store 813, 815, 861, 863, 864 sf/GFA 0.10 $ 0.18
Home Im rovement Su erstore 862 sf/GFA 0.37 $ 0.66
Car Sales -New 841 sf%GFA 0.09 $ 0.15
Commercial - Xestauran!
Restaurant 931 sf/GFA 0.63 $ 1.13
Fast Food Restaurant 934 sf/GFA 2.87 $ 5.17
Notes:
ITE Land Use Code based on ITE Trip Generation, 7th Edition
Impact fee rate calculation is based upon the following methodology:
- Truck Trip Rate =Daily Truck Trip Generation (per unit of measure)
- Truck Trip Rate x Per Trip Fee =Impact Fee Rate (per unit of measure)
For land uses not specifically identified in the table, trip generation rates could be derived from a special study
by the applicant.
sf /GFA=Square feet of Gross Floor Area; sf/GLA= Square Feet of Gross Leasable Area
Impact Fees By Land Use -Revenue Credit = 20% (Per Ordinance No. 5977 and amended by
Resolution No. 4022)
Total Adjustment Fire and EMS
Fire and EMS Cost (Revenue Impact Fee
Per Unit Of Credit) At Per
Land Use Development 20% Unit of Development
Residential
Single Family, Duplex, Mobile Home $ 362.66 $ 72.53 $ 290.13 per dwelling unit
Multi-family 383.09 76.62 306.47 per dwelling unit
Non-Residential
Hotel/Motel 0.53 0.11 0.42 per sq ft
-------------------------------------------------- ---------------------------
Page 18 -------------------- -----------------------------------------
January 1, 2007
Hospital/Clinic 1.05 0.21 0.84 per sq ft
Group Living 2.63 0.53 2.10 per sq ft
Office 0.29 0.06 0.23 per sq ft
Retail 0.62 0.12 0.50 per sq ft
Restaurant/Bar/Lounge 1.62 0.32 1.30 per sq ft
Industrial/Manufacturing 0.11 0.02 0.09 per sq ft
Leisure/Outdoors 1.08 0.22 0.86 per sq ft
Agriculture 0.71 0.14 0.57 per sq ft
Church 0.38 0.08 0.30 per sq ft
Schools/Colleges 1.07 0.21 0.86 per sq ft
Government/Public Buildings 1 81 0.36 1.45 per sq ft
Casino 3.78 0.77 3.01 per sq ft
Jails 21.99 4.40 17.59 Per sq ft
FACILITY EXTENSION FEES (Per Ordinance No. 5791 and amended by Ordinance No. 5819
and Resolution No. 3953.)
The Facility Extension Application Fee is $516.00, plus $155.00 for each Facility (Water,
Sanitary Sewer, Storm Drainage, Street, private street and private storm systems within private
streets).
Facility Extension Fees are the summation of the following categories (a+b+c+d), or
$1,550.00, whichever is greater.
a. For the combined linear footage of water, sewer, storm drainage and private storm
drainage within private streets:
The first 0 lineal feet (LF) to 1000 LF is charged at $5.15 per LF plus,
The next 1001 LF to 2500 LF is charged at $2.60 per LF plus,
Any additional over 2500 LF is charged at $1.55 per LF.
d
b. For the linear footage of streets and private streets:
The first 0 LF to 500 LF will be charged at $6.45 per LF plus,
The next 501 LF to 1000 LF will be charged at $3.85 per LF plus,
Any additional over 1000 LF will be charged at $1.03 per LF.
c. -For non-linear extensions such as pump stations or traffic signals, the extension fee
will be determined by the City Engineer based on an estimate of the City's labor Cost
associated with the plan review, inspection, and administration of the application
For that portion of the water or sewer facility located outside City Limits, but within
existing County (King or Pierce) right-of-way, an additional fee of $413.00 plus $4.65
Page 19 January 1, 2007
per LF of the combined water and sewer extension located in the existing County
right-of-way applies.
Facility Extension Fees will be paid as follows:
1. Forty percent (40%) at the time of execution of the facility extension agreement
2. Sixty percent (60%) upon the City's approval of the construction drawings and prior
to the start of construction.
Page 20 January 1, 2007
Right-of-Way Permit: (Per Ordinance No. 5819)
30-Day permit $25.00
31-Day to 5-Year permit $75.00
Flood Control Zone Permit: (Per Ordinance No. 5819)
Base permit fee $50.00
Utility System Development Fees: (Per Ordinance No. 5819 and amended by
Resolution No. 3797 and Resolution No. 3953.)
For all Utilities, a charge in lieu of assessment or payback charges may be applicable
for the proportional share of the utility line being connected to.
Water Utility
Connection fees are comprised of a Water Service Installation Permit Fee and the
System Development Charge as follows:
Meter Water Service Installation Permit Fee System
Size Existing Water Service Water Service & Meter Box Installed b Cit *` Development
In Inches & Meter Box* Paved Street Un aved Street Char e SDC
3/< or less $205.00 $2,100.00 $1,130.00 $2,424.00
1 $270.00 $2,300.00 $1,425.00 $4,048.00
1-1/2 $435.00 $3,100.00 $2,225.00 $8,072.00
2 $540.00 $3,370.00 $2,500.00 $12,920.00
3 Actual Cost Actual Cost Actual Cost $24,240.00
4 Actual Cost Actual Cost Actual Cost $40,408.00
6 Actual Cost Actual Cost Actual Cost $80,792.00
8 Actual Cost Actual Cost Actual Cost $129,280.00
10 Actual Cost Actual Cost Actual Cost $135,971.00
*Installation of a water meter done by the City and the service either already exists or has peen instaiiea
by the developer.
"*Installation of the entire water service is done by the City.
Sanitary Sewer Utility
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Type Permit Fee System Development
Existing
Sewer Stub New Service Line
Re uired Charge (SDC)''*
Sin le Famil Parcel $85.00 $150.00 $850.00 Per Parcel
-------------------------------------------------------------------------------------------
Page 21 January 1, 2007
Other Parcels $85.00 $150.00 $850.00 Per RCE*
Side sewer repair on $60.00
rivate ro ert
Side sewer repair in $100.00
ri ht-of-wa
* RCE, Residential Customer Equivalent - an RCE shall be as defined by the King County
Department of Natural Resources.
**Except that for multifamily residential units with separate water meters for each family
unit, the sewer utility systems development charge will be calculated as one RCE per
family unit.
In addition to City sanitary sewer connection fees, there shall be a sanitary sewer
connection fee imposed to pay Capital Improvement fees to King County per the King
County Rate Schedule.
Storm Drainage Utility
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Type Permit Fee System Development Charge (SDC)
Single Family Residence & Duplexes (on
Individual Parcels) $15.00 Per
Parcel* $1.,162.00 per Parcel
Other Parcels $105.00 $1,162.00 per ESU**
*More than one single-family residence or one duplexes per parcel will be charged at
the Other Parcel rate.
**ESU, Equivalent Service Unit - A configuration of development of impervious surfaces
estimated to contribute an amount of runoff to the City's storm drainage system which is
approximately equal to that created by the average single family residential parcel. One
ESU is considered equal to 2,600 square feet of parcel coverage by impervious surfaces.
When calculating the total SDC, a credit will be applied for the existing impervious area.
Other Utility Fees: (Per Ordinance No. 5819 and 5944 and amended by Resolution No. 3953.)
Fire service line permit $130.00
Fire Hydrant Permits:
Fire Hydrant Permit and Inspection Fee $230.00
Page 22 January 1, 2007
Hydrant Meter Monthly Rate $30.00
Hydrant Meter Weekly Rate $25.00
Hydrant Meter Wrench -Refundable Deposit $30.00
Deposit -Hydrant Meter with RPGA Wrench and Valve $1,400.00
Water Main extension purity test fee $175.00
Water Meter test fee, 2" or less $210.00
Water Meter test fee greater than 2" At Actual Cost
Storm Drainage Repair Permit
Private Storm System located on Private Property $30.00
Storm System located in Public Right-of-Way/Easement $55.00
Payback Administrative Fees: (Per Ordinance No. 5954)
Application Fee $ 500.00
Processing Fee $1,000.00
Area or Special Benefit Analysis $ 500.00
Transaction/Collection Fee $ 300.00
Outside Professional Services Time and Materials
Construction Permits (Per Ordinance No. 5817)
The fees for Construction Permits are as follows:
Basic Fee (BF) _ $142.00
Hourly hispection Rate (HIR)
Normal Business Hours = $48.00
After Hours = $62.00
After hours work includes weeknights, weekends, and Holidays and will be at the After
Hours HIR x the duration of the work.
For Excavation Type Work:
Length of Excavation (feet)
31 - 100
101 - 250
251 - 500
501 - 750
751 - 1000
Additional Fee lAF)
$48.00
$143.00
$238.00
$332.00
$427.00
Permit Fee = BF + AF(for the appropriate length of excavation)
Page 23 January 1, 2007
If the excavation exceeds 1000 linear feet the following will be used:
Permit Fee = BF + $414.00 + (HIR x (Length of Excavation - 1000)/100)
For Non-Excavation Type Work:
This work includes any work in the public right-of-way that is not covered by any other
permits and includes such things as overhead utility work, geotechnical borings,
horizontal directional drilling and vault installation.
Permit Fee = BF + (HIR x Permit Duration in days)
In Lieu of Fee:
In lieu of the above standard rates, the city engineer or his/her designee may calculate
the fee based upon current labor rates for administrative and inspection staff after
developing an estimate of staff effort involved. For projects that are expected to involve
significantly more than 1,000 feet of street excavation or when the scope or duration
cannot be accurately estimated, the city engineer may establish a deposit account to
manage permitee deposits in advance of permit issuance for reimbursing actual labor
costs of administering the permit. Such deposit accounts will not be interest bearing and
will be closed at the end of the permitted work when a final accounting of the permit
administration cost shall be calculated and a final bill or credit issued to the permitee.
Special Permits (Per Ordinance No. 5817
Permit Type Base
Fee
Sidewalk $52.00
Residential Driveway $52.00
Commercial $103.00
Driveway
and amended by Resolution No. 3953)
Additional Per Linear Foot Fee
$1.03 per foot for each foot over 25 Linear Feet
$1.55 per foot for each foot over 20 Linear Feet*
$2.05 per foot for each foot over 48 Linear Feet*
*Driveway widths are based on the width of the driveway apron in the right-of-way.
----------------------------------------------------------------------------------------------------------------------------------
Page 24 January 1, 2007
I. PARKS AND RECREATION (Per Resolution No. 3797 and amended by
Resolution No. 3953 and Resolution No. 4117.)
(These fees and charges have been previously established but not heretofore
included in the fee schedule.)
BUILDINGS FEES
Resident Non-Resident
Senior Activity Center
Full Facility
4 hours Friday and up to 12 hours on Saturday
Rental Package Full Day Saturday or Full Day Sunday
Up to 12 hours on either day
Millennium Room
Damage & Cleaning Deposit
Without Alcohol
With Alcohol
Optional cleaning fee
Weese & Rotary Rooms
Catering ~ Kitchen
Commercial kitchen &/or
use dishes, tableware, pots, etc.
Kitchen with Millennium Room 3
Kitchen with Full Facility
Parks & Recreation Admin. Bldg.
Basic Kitchen
Les Gove Bldg.
Veterans Memorial Bldg.
White River Valley Museum
Full Facility
Muckleshoot Room
$80 per hour $100 per hour
$1200 $1500
$1000 $1300
$20 per hour $25 per hour
$300 $300
$500 $500
$125 -groups of 124 or less
$150 -groups of 125 or more
$10 per hour $13 per hour
$50
$25
No charge
$20 per hour
$25
$10 per hour
$5 per hour
$50
$25
No charge
$25 per hour
$25
$13 per hour
$7 per hour
$125 per hour $125 per hour
$40 per hour $40 per hour
Field Fees
Baseball/Softball Fields Youth
and Grass Soccer Fields Adult
Field Lights
Resident
$4 per hour
$12 per hour
$15 per hour
Non-Resident
$5 per hour
$15 per hour
$15 per hour
Page 25 January 1, 2007
Baseball/Softball Tournaments
Baseball/Softball Field Maintenance
occurrence
Grass Soccer Field Maintenance
occurrence
Youth 1 Day/$500 1 Day/$500
Adult 1 Day/$800 2 Day/$1,100
$25 per occurrence $25 per
$50 per occurrence $50 per
Turf Fields Youth $24 per hour
Adult $32 per ho ur
Picnic S helter, Amphitheate r, and Camping Rentals
Reside nt Non-Resident
Game Farm Park Half Day Full Da y Half Day Full Day
Mon-Fri (Single Quadrant) $15 $30 $20 $40
Sat-Sun (Single Quadrant) NA NA NA NA
Mon-Sun (Full Shelter)
1-99 People $60 $120 $80 $160
100-199 People $90 $180 $120 $240
Z00 + People NA $250 NA $300
Amphitheater $35 $70 $45 $90
Sunset Park
Mon-Sun (Single Quadrant) $15 $30 $20 $40
Mon-Sun (Full Shelter}
1-99 People $60 $120 $80 $160
100-199 People $90 $180 $120 $240
200 + People NA $250 NA $300
Roegner $30 $60 $40 $80
Isaac Evans $30 $60 $40 $80
Game Farm Wilderness $30 $60 $40 $80
Game Farm Wilderness Cam ping
Game Farm Camping $20 Per Night $25 Per Night
Day Camp Area $50 Per Day $70 Per Day
IMPACT FEES
Park Impact Fees
In accordance with Ordinance No. 6063
$30 per hour
$40 per hour
$3,500.00 per residential dwelling unit
Page 26
January 1, 2007
J. BUSINESS LICENSE FEES
Rental Housing Business License Fee (effective July 1, 2005) (Per
Ordinance No. 5882)
(1) The fee for a license to operate rental housing businesses in the City, as
defined in Chapter 5.22 of the City Code shall be based on the total number of units as
follows:
(a) One to four dwelling units: $50.00 per year;
(b) Five to 24 dwelling units: $100.00 per year;
(c) Twenty-five or more dwelling units: $200.00 per year.
(2) The fee for a license to operate rental housing businesses in the city shall be
for the license year from July 1 through June 30, and each applicant must pay the full
fee for the current license year or any portion thereof during which the applicant has
engaged in the operation of rental housing businesses.
(3) The rental housing business license fee required by this chapter is in lieu of,
and not in addition to, the general business license fee required by Chapters 5.05 and
5.10 of the City Code; provided, however, that any person required to obtain a rental
housing business license must also obtain a general business license, at no cost,
pursuant to Chapters 5.05 and 5.10 of the City Code.
(4) Notwithstanding the provisions of sub-section (1) of this section, the fee for
operating rental housing facilities for any single individual, partnership, corporation or
entity shall not exceed $400.00 per year
Page 27 January 1, 2007
K. MULTIMEDIA DUPLICATION (Per Resolution No. 3953)
VHS copy DVD copy CD copy
$8.00 per tape $10.00 per disc $5.00 per disk
------------------------------------------------------------------------------------------------------------------------------------------