CITY OF AUBURN
Public Works
Surface Water Management Manual
November 2009
Revision #1
Effective June 6, 2014
City of Auburn
Department of Public Works
25 West Main
Auburn, WA 98001-4998
Notice
This manual was developed and written by the City of Tacoma Environmental Services Maintenance Division
and Science and Engineering Division staff. It has been modified for use within the City of Auburn with
written permission from the City of Tacoma.
Acknowledgement
The City of Auburn would like to thank the City of Tacoma for permission to use the
Tacoma Surface Water Management Manual (SWMM) as the basis for this document.
The City would further like to acknowledge that the Tacoma SWMM was developed
and written by the City of Tacoma Environmental Services Maintenance Division and
Science and Engineering Division staff.
Special thanks to Lorna Mauren, PE and the Tacoma Science and Engineering
Division for providing an editable electronic version of the Tacoma SWMM.
THIS PAGE INTENTIONALLY LEFT BLANK.
REVISION DIRECTIONS
AUBURN SURFACE WATER MANAGEMENT MANUAL
EFFECTIVE DATE 06/06/2014
Revision No. 1
Preface, Volume I, Volume III, & Volume V
New, reprinted pages included with this revision are listed by page number in the right-
hand column below. The left-hand column lists obsolete material, which should be
removed from the book. Follow the instruction columns in sequence: remove and insert
pages as necessary.
When completed, insert these directions in a convenient place near the front of the
Surface Water Management Manual. For future reference, the person making these
changes may also date and initial this page.
Remove these pages Insert these pages
Preface page 3-4 Preface page 3-4
Volume I, Table of Contents Volume I, Table of Contents
Volume I, pages 25-32 Volume I, pages 25-32
Volume I, pages 47-48 Volume I, pages 47-48
Volume III, pages 307-310 Volume III, pages 307-310
Volume III, pages 351-354 Volume III, pages 351-354
Volume III, pages 357-364 Volume III, pages 357-364
Volume V, pages 701-706 Volume V, pages 701-706
Volume V, pages 715-716 Volume V, pages 715-716
Approved by City of Auburn, Public Works Committee April 21, 2014
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
i Table of Contents
Table of Contents
Preface..........................................................................................................................................................................1
Objective ..........................................................................................................................................................1
Organization of this Manual.................................................................................................................................2
How to Use this Manual........................................................................................................................................3
Development of Best Management Practices (BMPs) for Stormwater Management......................................4
Best Management Practices (BMPs)................................................................................................................................4
Source Control BMPs........................................................................................................................................................4
Treatment BMPs...............................................................................................................................................................4
Flow Control BMPs...........................................................................................................................................................4
Related Documentation........................................................................................................................................5
Department of Ecology’s Stormwater Management Manual.............................................................................................5
Applicable Federal, State and Local Regulatory Requirements........................................................................................5
Volume I: Stormwater Site Planning.........................................................................................................7
Purpose of this Volume........................................................................................................................................7
Content and Organization of this Volume..........................................................................................................7
Chapter 1 Development and Redevelopment Impacts..................................................................................8
1.1 Hydrologic Changes................................................................................................................................................8
1.2 Water Quality Changes...........................................................................................................................................8
1.3 Biological Changes..................................................................................................................................................9
Chapter 2 Areas with Special Development Requirements........................................................................10
2.1 Groundwater Protection Area 2.............................................................................................................................10
2.2 Impaired Water Bodies..........................................................................................................................................10
2.3 Floodplains............................................................................................................................................................10
Chapter 3 Minimum Requirements for New Development and Redevelopment.......................................11
3.1 Overview of the Minimum Requirements...............................................................................................................11
3.2 Exemptions............................................................................................................................................................12
3.2.1 Road Maintenance..................................................................................................................................12
3.2.2 Parking Lots and Parking Lot Maintenance.............................................................................................12
3.2.3 Underground Utility Projects....................................................................................................................13
3.2.4 Minor Clearing and Grading....................................................................................................................13
3.2.5 Emergencies...........................................................................................................................................13
3.2.6 Key Terms...............................................................................................................................................13
3.3 Applicability of the Minimum Requirements...........................................................................................................14
3.3.1 New Development...................................................................................................................................17
3.3.2 Redevelopment.......................................................................................................................................17
3.3.3 Assessed Value.......................................................................................................................................18
3.3.4 Roads......................................................................................................................................................18
3.3.5 Cumulative Impact Mitigation Requirement.............................................................................................19
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
ii Table of Contents
3.4 Description of Minimum Requirements..................................................................................................................21
3.4.1 Minimum Requirement #1: Preparation of a Stormwater Site Plan.........................................................21
3.4.2 Minimum Requirement #2: Construction Stormwater Pollution Prevention (SWPP)...............................21
3.4.3 Minimum Requirement #3: Source Control of Pollution...........................................................................22
3.4.4 Minimum Requirement #4: Preservation of Natural Drainage Systems and Outfalls..............................23
3.4.5 Minimum Requirement #5: On-Site Stormwater Management................................................................23
3.4.6 Minimum Requirement #6: Runoff Treatment.........................................................................................24
3.4.7 Minimum Requirement #7: Flow Control.................................................................................................25
3.4.8 Minimum Requirement #8: Wetlands Protection.....................................................................................27
3.4.9 Minimum Requirement #9: Operation and Maintenance.........................................................................29
3.4.10 Minimum Requirement #10: Off-Site Analysis and Mitigation.................................................................29
3.5 Exceptions.............................................................................................................................................................30
Chapter 4 Preparation of Stormwater Site Plans.........................................................................................33
4.1 Stormwater Site Plan Outline.................................................................................................................................33
4.2 Plans Required After Stormwater Site Plan Approval............................................................................................40
4.3 Land Use Submittal Requirements........................................................................................................................40
Appendix A Regulatory Requirements.............................................................................................................41
Appendix B Stormwater Site Plan Submittal Requirements Checklist.........................................................46
Appendix C Hydraulic Analysis Worksheet.....................................................................................................53
Appendix D Maintenance Standards for Drainage Facilities.........................................................................55
Appendix E Wetlands and Stormwater Management Guidelines..................................................................85
Volume II: Stormwater Management for Construction Sites...............................................................113
Purpose of this Volume....................................................................................................................................113
Content and Organization of this Volume......................................................................................................113
Chapter 1 The 12 Elements of Construction Stormwater Pollution Prevention.....................................114
Chapter 2 Developing a Construction Stormwater Pollution Prevention Plan (SWPPP)......................123
2.1 General Requirements and Guidelines...............................................................................................................123
2.1.1 BMP Standards and Specifications.......................................................................................................123
2.1.2 General Principles.................................................................................................................................124
2.2 Step-by-Step Procedure......................................................................................................................................124
2.2.1 Step 1 – Data Collection........................................................................................................................124
2.2.2 Step 2 – Data Analysis..........................................................................................................................125
2.2.3 Step 3 – Construction SWPPP Development and Analysis..................................................................127
2.3 Construction SWPPP Checklists.........................................................................................................................128
Chapter 3 Standards and Specifications for Best Management Practices (BMPs).................................134
3.1 Source Control BMPs..........................................................................................................................................135
3.1.1 BMP C101: Preserving Natural Vegetation...........................................................................................135
3.1.2 BMP C102: Buffer Zone........................................................................................................................138
3.1.3 BMP C103: High Visibility Plastic or Metal Fence.................................................................................139
3.1.4 BMP C104: Stake and Wire Fence.......................................................................................................140
3.1.5 BMP C105: Stabilized Construction Entrance.......................................................................................141
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
iii Table of Contents
3.1.6 BMP C106: Wheel Wash.......................................................................................................................144
3.1.7 BMP C107: Construction Road/Parking Area Stabilization...................................................................146
3.1.8 BMP C120: Temporary and Permanent Seeding..................................................................................148
3.1.9 BMP C121: Mulching.............................................................................................................................154
3.1.10 BMP C122: Nets and Blankets..............................................................................................................156
3.1.11 BMP C123: Plastic Covering.................................................................................................................161
3.1.12 BMP C124: Sodding..............................................................................................................................164
3.1.13 BMP C125: Compost.............................................................................................................................165
3.1.14 BMP C126: Topsoiling...........................................................................................................................167
3.1.15 BMP C127: Polyacrylamide for Soil Erosion Protection........................................................................170
3.1.16 BMP C130: Surface Roughening..........................................................................................................173
3.1.17 BMP C131: Gradient Terraces..............................................................................................................175
3.1.18 BMP C140: Dust Control.......................................................................................................................177
3.1.19 BMP C150: Materials On Hand.............................................................................................................179
3.1.20 BMP C151: Concrete Handling.............................................................................................................180
3.1.21 BMP C152: Sawcutting and Surfacing Pollution Prevention.................................................................181
3.1.22 BMP C153: Material Delivery, Storage and Containment.....................................................................182
3.1.23 BMP C154: Concrete Washout Area.....................................................................................................184
3.1.24 BMP C160: Certified Erosion and Sediment Control Lead....................................................................190
3.1.25 BMP C161: Payment of Erosion Control Work......................................................................................192
3.1.26 BMP C162: Scheduling.........................................................................................................................193
3.1.27 BMP C180: Small Project Construction Stormwater Pollution Prevention............................................194
3.2 Runoff, Conveyance and Treatment BMPs.........................................................................................................196
3.2.1 BMP C200: Interceptor Dike and Swale................................................................................................196
3.2.2 BMP C201: Grass-Lined Channels.......................................................................................................199
3.2.3 BMP C202: Channel Lining...................................................................................................................203
3.2.4 BMP C203: Water Bars.........................................................................................................................205
3.2.5 BMP C204: Pipe Slope Drains..............................................................................................................207
3.2.6 BMP C205: Subsurface Drains.............................................................................................................210
3.2.7 BMP C206: Level Spreader...................................................................................................................213
3.2.8 BMP C207: Check Dams......................................................................................................................215
3.2.9 BMP C208: Triangular Silt Dike (Geotextile-Encased Check Dam)......................................................218
3.2.10 BMP C209: Outlet Protection................................................................................................................222
3.2.11 BMP C220: Storm Drain Inlet Protection...............................................................................................224
3.2.12 BMP C231: Brush Barrier......................................................................................................................234
3.2.13 BMP C232: Gravel Filter Berm..............................................................................................................236
3.2.14 BMP C233: Silt Fence...........................................................................................................................237
3.2.15 BMP C234: Vegetated Strip..................................................................................................................243
3.2.16 BMP C235: Straw Wattles.....................................................................................................................244
3.2.17 BMP C240: Sediment Trap...................................................................................................................247
3.2.18 BMP C241: Temporary Sediment Pond................................................................................................251
3.2.19 BMP C250: Construction Stormwater Chemical Treatment..................................................................258
3.2.20 BMP C251: Construction Stormwater Filtration.....................................................................................265
3.2.21 BMP C252: High pH Neutralization using CO2......................................................................................269
3.2.22 BMP C253: pH Control for High pH Water............................................................................................272
Appendix A Standard Notes for Erosion Control Plans................................................................................273
Appendix B Background Information on Chemical Treatment....................................................................274
Appendix C Construction SWPPP Short Form..............................................................................................277
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
iv Table of Contents
Volume III: Surface Water Quantity Control and Conveyance............................................................307
Purpose of this Volume....................................................................................................................................307
Content and Organization of this Volume......................................................................................................307
Chapter 1 Hydrologic Analysis....................................................................................................................308
1.1 Minimum Computational Standards.....................................................................................................................308
1.2 Western Washington Hydrology Model...............................................................................................................308
1.3 Single-Event Hydrograph Method........................................................................................................................309
1.3.1 Design Storm.........................................................................................................................................309
1.3.2 Curve Number.......................................................................................................................................309
1.4 Closed Depression Analysis................................................................................................................................310
Chapter 2 Flow Control Design....................................................................................................................312
2.1 Roof Downspout Controls....................................................................................................................................312
2.1.1 Selection of Roof Downspout Controls..................................................................................................312
2.1.2 Downspout Infiltration Systems.............................................................................................................313
2.1.3 Downspout Dispersion Systems............................................................................................................319
2.1.4 Bioinfiltration “Rain Gardens”................................................................................................................321
2.1.5 Collect and Convey...............................................................................................................................326
2.2 Infiltration Facilities for Stormwater Flow Control ................................................................................................327
2.2.1 Purpose.................................................................................................................................................327
2.2.2 Description............................................................................................................................................327
2.2.3 Application.............................................................................................................................................327
2.2.4 Design Methodology..............................................................................................................................329
2.2.5 Simplified Approach..............................................................................................................................329
2.2.6 Detailed Approach.................................................................................................................................330
2.2.7 Site Characterization Criteria................................................................................................................334
2.2.8 Design Infiltration Rate Determination – Guidelines and Criteria..........................................................338
2.2.9 Three Methods for Determining Long-term Infiltration Rates for Sizing Infiltration Facilities.................339
2.2.10 Site Suitability Criteria (SSC).................................................................................................................343
2.2.11 Design Criteria for Infiltration Facilities..................................................................................................345
2.2.12 Construction Criteria..............................................................................................................................346
2.2.13 Maintenance Criteria.............................................................................................................................347
2.2.14 Verification of Performance...................................................................................................................347
2.2.15 Infiltration Basins...................................................................................................................................347
2.2.16 Infiltration Trenches...............................................................................................................................349
2.3 Detention Facilities..............................................................................................................................................351
2.3.1 Detention Ponds....................................................................................................................................351
2.3.2 Detention Tanks....................................................................................................................................367
2.3.3 Detention Vaults....................................................................................................................................371
2.3.4 Control Structures.................................................................................................................................375
2.3.5 Other Detention Options........................................................................................................................386
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
v Table of Contents
Chapter 3 Conveyance System Design and Hydraulic Analysis.............................................................387
3.1 Conveyance System Analysis Requirements......................................................................................................387
3.1.1 On-site Analysis....................................................................................................................................387
3.1.2 Offsite Analysis (1/4 mile Downstream Analysis)..................................................................................388
3.2 Design Event.......................................................................................................................................................388
3.2.1 Additional Design Criteria......................................................................................................................389
3.3 Methods of Analysis............................................................................................................................................389
3.3.1 Rational Method....................................................................................................................................390
3.4 Pipes, Culverts and Open Channels....................................................................................................................396
3.4.1 Pipe Systems........................................................................................................................................396
3.4.2 Culverts.................................................................................................................................................413
3.4.3 Open Channels.....................................................................................................................................424
3.5 Outfalls Systems..................................................................................................................................................440
3.5.1 Outfall Design Criteria...........................................................................................................................440
3.5.2 Tightline Systems..................................................................................................................................448
3.5.3 Habitat Considerations..........................................................................................................................448
3.6 Pump Systems....................................................................................................................................................448
3.6.1 Design Criteria.......................................................................................................................................449
3.6.2 Pump Requirements..............................................................................................................................449
3.6.3 Additional Requirements.......................................................................................................................449
3.6.4 Sump Pumps.........................................................................................................................................450
3.7 Easements and Access......................................................................................................................................450
3.7.1 Public Easements..................................................................................................................................450
3.7.2 Private Easements................................................................................................................................451
3.7.3 Maintenance Access.............................................................................................................................451
Appendix A Auburn Design Storm.................................................................................................................453
Appendix B Procedure for Conducting a Pilot Infiltration Test...................................................................454
Volume IV: Source Control Best Management Practices....................................................................457
Purpose of this Volume....................................................................................................................................457
Content and Organization of this Volume......................................................................................................457
Chapter 1 Frequently Asked Questions......................................................................................................458
1.1 Applicability..........................................................................................................................................................458
1.2 Pollutants of Concern..........................................................................................................................................458
1.2.1 pH..........................................................................................................................................................458
1.2.2 Total Suspended Solids........................................................................................................................458
1.2.3 Oils and Greases...................................................................................................................................458
1.2.4 Oxygen-demanding Substances...........................................................................................................458
1.2.5 Metals....................................................................................................................................................459
1.2.6 Bacteria and Viruses.............................................................................................................................459
1.2.7 Nutrients................................................................................................................................................459
1.2.8 Toxic Organic Compounds....................................................................................................................459
1.2.9 Other Chemicals and Substances.........................................................................................................459
1.3 Types of Source Control BMPs...........................................................................................................................460
1.3.1 Operational BMPs.................................................................................................................................460
1.3.2 Structural BMPs....................................................................................................................................460
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
vi Table of Contents
Chapter 2 Worksheet for Commercial and Industrial Activities...............................................................461
Chapter 3 BMPs for Homeowners...............................................................................................................465
3.1 Automobile Washing (for Single-Family Residences)..........................................................................................465
3.1.1 Suggested BMPs...................................................................................................................................465
3.2 Automobile Maintenance.....................................................................................................................................466
3.2.1 Required BMPs.....................................................................................................................................466
3.2.2 Suggested BMPs...................................................................................................................................466
3.3 Storage of Solid Wastes and Food Wastes.........................................................................................................467
3.3.1 Suggested BMPs...................................................................................................................................467
3.4 Composting.........................................................................................................................................................467
3.4.1 Suggested BMPs...................................................................................................................................467
3.5 Yard Maintenance and Gardening.......................................................................................................................468
3.5.1 Required BMPs.....................................................................................................................................468
3.5.2 Suggested BMPs...................................................................................................................................468
3.6 Swimming Pool and Spa Cleaning and Maintenance..........................................................................................469
3.6.1 Required BMPs.....................................................................................................................................469
3.6.2 Suggested BMPs...................................................................................................................................469
3.7 Household Hazardous Material Use, Storage, and Disposal..............................................................................469
3.7.1 Required BMPs.....................................................................................................................................470
3.7.2 Suggested BMPs...................................................................................................................................470
3.8 General Home Maintenance................................................................................................................................471
3.8.1 Suggested BMPs...................................................................................................................................471
3.9 Pet Waste............................................................................................................................................................471
3.9.1 Suggested BMPs...................................................................................................................................471
Chapter 4 BMPs for Commercial and Industrial Activities........................................................................472
4.1 BMPs to Consider for all Activities.......................................................................................................................472
4.2 Cleaning and Washing Activities.........................................................................................................................473
4.2.1 BMP A101: Cleaning or Washing of Tools, Engines and Manufacturing Equipment...........................473
4.2.2 BMP A102: Cleaning or Washing of Cooking Equipment......................................................................476
4.2.3 BMP A103: Washing, Pressure Washing and Steam Cleaning of Vehicles/Equipment/Building
Structures..............................................................................................................................................478
4.2.4 BMP A104: Collection and Disposal of Wastewater in Mobile Interior Washing Operations.................481
4.3 Transfer of Liquid or Solid Materials....................................................................................................................483
4.3.1 BMP A201: Loading and Unloading Areas for Liquid or Solid Material.................................................483
4.3.2 BMP A202: Fueling at Dedicated Stations............................................................................................488
4.3.3 BMP A203: Vehicle Maintenance Activities...........................................................................................494
4.3.4 BMP A204: Mobile Fueling of Vehicles and Heavy Equipment.............................................................496
4.4 Production and Application Activities...................................................................................................................499
4.4.1 BMP A301: Concrete and Asphalt Mixing and Production at Stationary Sites......................................499
4.4.2 BMP A302: Concrete Pouring, Concrete Cutting, and Asphalt Application at Temporary Sites...........501
4.4.3 BMP A303: Manufacturing and Post-Processing of Metal Products.....................................................503
4.4.4 BMP A304: Wood Treatment Areas......................................................................................................505
4.4.5 BMP A305: Commercial Composting....................................................................................................507
4.4.6 BMP A306: Landscaping and Lawn/Vegetation Management..............................................................509
4.4.7 BMP A307: Painting, Finishing and Coating of Vehicles, Boats, Buildings and Equipment..................514
4.4.8 BMP A308: Commercial Printing Operations........................................................................................516
4.4.9 BMP A309: Manufacturing Operations – Outside.................................................................................517
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
vii Table of Contents
4.5 Storage and Stockpiling Activities.......................................................................................................................519
4.5.1 BMP A401: Storage or Transfer (Outside) of Solid Raw Materials, By-Products or
Finished Products..................................................................................................................................519
4.5.2 BMP A402: Storage and Treatment of Contaminated Soils..................................................................522
4.5.3 BMP A403: Temporary Storage or Processing of Fruits or Vegetables................................................523
4.5.4 BMP A404: Storage of Solid Wastes and Food Wastes.......................................................................525
4.5.5 BMP A405: Recyclers and Scrap Yards................................................................................................527
4.5.6 BMP A406: Treatment, Storage or Disposal of Dangerous Wastes......................................................528
4.5.7 BMP A407: Storage of Liquid, Food Waste or Dangerous Waste Containers......................................529
4.5.8 BMP A408: Storage of Liquids in Above-Ground Tanks.......................................................................532
4.5.9 BMP A409: Parking and Storage for Vehicles and Equipment.............................................................535
4.6 Construction and Demolition Activities................................................................................................................536
4.6.1 BMP A501: Clearing, Grading and Preparation of Construction Sites..................................................536
4.6.2 BMP A502: Demolition of Buildings.......................................................................................................537
4.6.3 BMP A503: Building, Repair, Remodeling and Construction.................................................................538
4.7 Dust Control, and Soil and Sediment Control......................................................................................................540
4.7.1 BMP A601: Dust Control at Disturbed Land Areas and Unpaved Roadways and Parking Lots...........540
4.7.2 BMP A602: Dust Control at Manufacturing Sites...................................................................................542
4.7.3 BMP A603: Soil Erosion and Sediment Control at Industrial Sites........................................................543
4.8 Other Activities....................................................................................................................................................544
4.8.1 BMP A701: Commercial Animal Handling Areas...................................................................................544
4.8.2 BMP A702: Log Sorting and Handling...................................................................................................545
4.8.3 BMP A703: Boat Building, Maintenance and Repair.............................................................................546
4.8.4 BMP A704: Logging..............................................................................................................................549
4.8.5 BMP A705: Mining and Quarrying of Sand, Gravel, Rock, Peat, Clay and Other Materials..................551
4.8.6 BMP A706: Swimming Pool and Spa Cleaning and Maintenance........................................................552
4.8.7 BMP A707: De-Icing and Anti-Icing Operations for Streets & Highways...............................................553
4.8.8 BMP A708: Roof and Building Drains at Manufacturing and Commercial Buildings.............................554
4.8.9 BMP A709: Urban Streets.....................................................................................................................555
4.8.10 BMP A710: Railroad Yards...................................................................................................................557
4.8.11 BMP A711: Maintenance of Public and Utility Corridors and Facilities.................................................558
4.8.12 BMP A712: Maintenance of Roadside Ditches......................................................................................560
4.8.13 BMP A713: Maintenance of Stormwater Drainage and Treatment Facilities.......................................562
4.8.14 BMP A714: Spills of Oil and Hazardous Substances............................................................................564
4.8.15 BMP A715: Water Reservoir, Transmission Mainline, Wellhead, and Hydrant Flushing Activities.......566
4.8.16 BMP S101: Eliminate Illicit Storm Drainage System Connections........................................................568
4.8.17 BMP S102: Dispose of Contaminated Stormwater and Waste Materials Properly...............................569
4.8.18 BMP S103: Discharge Process Wastewater to a Sanitary Sewer, Holding Tank, or
Water Treatment System......................................................................................................................570
4.8.19 BMP S108: Implement Integrated Pest Management Measures..........................................................571
4.8.20 BMP S109: Cleaning Catch Basins.......................................................................................................572
4.9 Cover and Surround Activities.............................................................................................................................573
4.9.1 BMP S104: Cover the Activity with a Roof or Awning...........................................................................573
4.9.2 BMP S105: Cover the Activity with an Anchored Tarp or Plastic Sheet................................................574
4.9.3 BMP S106: Pave the Activity Area and Slope to a Sump, Holding Tank, or Oil/Water Separator........575
4.9.4 BMP S107: Surround the Activity Area with a Curb, Dike, or Berm or Elevate the Activity...................576
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
viii Table of Contents
Chapter 5 Regulations and Requirements..................................................................................................580
5.1 City of Auburn Codes and Ordinances................................................................................................................580
5.2 State, Federal, and Other Regulations and Requirements..................................................................................580
5.2.1 Washington State Department of Ecology Requirements for the Discharge of Process
Wastewaters Directly to Surface Waters...............................................................................................580
5.2.2 Washington State Department of Ecology Requirements for Dangerous Waste Generators...............581
5.2.3 Washington State Department of Ecology Stormwater NPDES Permit Requirements.........................581
5.2.4 Washington State Department of Ecology Requirements for Underground and Above
Ground Storage Tanks..........................................................................................................................582
5.2.5 U.S. Environmental Protection Agency and Ecology Emergency Spill Cleanup Requirements............582
5.2.6 Washington State Department of Agriculture Pesticide Regulations....................................................582
5.2.7 Puget Sound Clean Air Agency Air Quality Regulations.......................................................................582
Appendix A Quick Reference Phone Numbers..............................................................................................583
Appendix B Recycling/Disposal of Vehicle Fluids and Other Wastes.........................................................584
Appendix C Example of an Integrated Pest Management Program (IPM)...................................................585
Appendix D Recommendations for Management of Street Wastes............................................................588
Volume V: Water Quality Treatment BMPs...........................................................................................603
Purpose of this Volume....................................................................................................................................603
Content and Organization of this Volume......................................................................................................603
Chapter 1 Treatment Facility Selection Process........................................................................................604
1.1 Step-by-Step Selection Process for Treatment Facilities....................................................................................604
Chapter 2 Treatment Facility Menus...........................................................................................................610
2.1 Oil Control Menu..................................................................................................................................................610
2.1.1 Performance Goal.................................................................................................................................610
2.1.2 Options..................................................................................................................................................610
2.1.3 Application on the Project Site..............................................................................................................611
2.2 Phosphorus Treatment Menu..............................................................................................................................611
2.2.1 Performance Goal.................................................................................................................................611
2.2.2 Options..................................................................................................................................................611
2.3 Enhanced Treatment Menu.................................................................................................................................612
2.3.1 Performance Goal.................................................................................................................................612
2.3.2 Options..................................................................................................................................................612
2.4 Basic Treatment Menu........................................................................................................................................613
2.4.1 Performance Goal.................................................................................................................................613
2.4.2 Options..................................................................................................................................................614
Chapter 3 General Requirements for Stormwater Facilities.....................................................................615
3.1 Design Flow Volume and Flow Rate....................................................................................................................615
3.1.1 Water Quality Design Flow Volume.......................................................................................................615
3.1.1 Water Quality Design Flow Rate...........................................................................................................616
3.1.2 Flows Requiring Treatment...................................................................................................................616
3.2 Sequence of Facilities.........................................................................................................................................617
3.3 Setbacks, Slopes, and Embankments.................................................................................................................618
3.3.1 Setbacks................................................................................................................................................618
3.3.2 Side Slopes and Embankments............................................................................................................619
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
ix Table of Contents
3.4 Facility Liners.......................................................................................................................................................620
3.4.1 General Design Criteria.........................................................................................................................620
3.4.2 Design Criteria for Treatment Liners.....................................................................................................622
3.4.3 Design Criteria for Low Permeability Liner Options...............................................................................622
3.5 Hydraulic Structures............................................................................................................................................624
3.5.1 Flow Splitter Designs.............................................................................................................................624
3.5.2 Flow Spreading Options........................................................................................................................627
Chapter 4 Pretreatment................................................................................................................................632
4.1 Purpose...............................................................................................................................................................632
4.2 Application...........................................................................................................................................................632
4.3 BMPs for Pretreatment........................................................................................................................................632
4.3.1 BMP T610 Presettling Basin.................................................................................................................632
Chapter 5 Infiltration and Bio-infiltration Treatment Facilities.................................................................634
5.1 Purpose...............................................................................................................................................................634
5.2 Application...........................................................................................................................................................634
5.3 Site Suitability......................................................................................................................................................634
5.3.1 Setback Criteria (SSC-1).......................................................................................................................635
5.3.2 Groundwater Protection Areas (SSC-2)................................................................................................635
5.3.3 High Vehicle Traffic Areas (SSC-3).......................................................................................................635
5.3.4 Soil Infiltration Rate/Drawdown Time for Treatment (SSC-4)................................................................636
5.3.5 Depth to Bedrock, Water Table, or Impermeable Layer (SSC-5)..........................................................636
5.3.6 Soil Physical and Chemical Suitability for Treatment (SSC-6)..............................................................637
5.3.7 Seepage Analysis and Control (SSC-7)................................................................................................637
5.3.8 Cold Climate and Impact of Roadway Deicers (SSC-8)........................................................................637
5.3.9 Verification Testing of the Completed Facility.......................................................................................637
5.4 Site Characterization...........................................................................................................................................638
5.4.1 Field Methods used to Determine Subsurface Characterization...........................................................638
5.4.2 Design Infiltration Rate Determination...................................................................................................640
5.5 BMPs for Infiltration and Bio-infiltration Treatment..............................................................................................644
5.5.1 BMP T710 Infiltration Basins.................................................................................................................645
5.5.2 BMP T720 Infiltration Trenches.............................................................................................................646
5.5.3 BMP T730 Bio-infiltration Swale............................................................................................................648
Chapter 6 Sand Filtration Treatment Facilities...........................................................................................650
6.1 Purpose...............................................................................................................................................................650
6.2 Description...........................................................................................................................................................650
6.3 Applications and Limitations................................................................................................................................656
6.4 Site Suitability......................................................................................................................................................656
6.5 Design Criteria.....................................................................................................................................................656
6.5.1 Objective...............................................................................................................................................656
6.5.2 Sand Filter Sizing..................................................................................................................................656
6.6 Construction Criteria............................................................................................................................................659
6.7 Maintenance Criteria...........................................................................................................................................659
6.7.1 BMP T810 Sand Filter Vault..................................................................................................................661
6.7.2 BMP T820 Linear Sand Filter...............................................................................................................664
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
x Table of Contents
Chapter 7 Biofiltration Treatment Facilities................................................................................................666
7.1 Purpose...............................................................................................................................................................666
7.2 Applications.........................................................................................................................................................666
7.3 Site Suitability......................................................................................................................................................666
7.4 Best Management Practices................................................................................................................................666
7.4.1 BMP T910 Basic Biofiltration Swale......................................................................................................667
7.4.2 BMP T920 Wet Biofiltration Swale........................................................................................................683
7.4.3 BMP T930 Continuous Inflow Biofiltration Swale..................................................................................685
7.4.4 BMP T940 Basic Filter Strip..................................................................................................................686
7.4.5 BMP T950 Narrow Area Filter Strip.......................................................................................................689
Chapter 8 Wetpool Facilities........................................................................................................................691
8.1 Purpose...............................................................................................................................................................691
8.2 Best Management Practices................................................................................................................................691
8.2.1 BMP T1010 Wetponds - Basic and Large.............................................................................................692
8.2.2 BMP T1020 Wetvaults...........................................................................................................................708
8.2.3 BMP T1030 Stormwater Treatment Wetlands.......................................................................................714
8.2.4 BMP T1040 Combined Detention and Wetpool Facilities .....................................................................720
8.3 Combined Detention and Wetvault......................................................................................................................724
8.4 Combined Detention and Stormwater Wetland...................................................................................................726
8.4.1 Sizing Criteria........................................................................................................................................726
8.4.2 Design Criteria.......................................................................................................................................726
8.4.3 Inlet and Outlet Criteria.........................................................................................................................726
8.4.4 Planting Requirements..........................................................................................................................726
Chapter 9 Oil and Water Separators............................................................................................................727
9.1 Purpose...............................................................................................................................................................727
9.2 Description...........................................................................................................................................................727
9.3 Applications/Limitations.......................................................................................................................................727
9.4 Site Suitability......................................................................................................................................................730
9.5 Design Criteria.....................................................................................................................................................731
9.5.1 General Considerations.........................................................................................................................731
9.5.2 Criteria for Separator Bays....................................................................................................................731
9.5.3 Criteria for Baffles..................................................................................................................................732
9.6 Oil and Water Separator BMPs...........................................................................................................................732
9.6.1 BMP T1110 API (Baffle type) Separator Bay........................................................................................733
9.6.2 BMP T1111 Coalescing Plate (CP) Separator Bay...............................................................................735
Chapter 10 Emerging Technologies..............................................................................................................737
10.1 Background.........................................................................................................................................................737
10.2 Emerging Technology and the City of Auburn.....................................................................................................737
10.3 Ecology Role in Evaluating Emerging Technologies...........................................................................................737
10.4 Evaluation of Emerging Technologies.................................................................................................................737
10.5 Assessing Levels of Development of Emerging Technologies............................................................................738
10.6 Examples of Emerging Technologies for Stormwater Treatment and Control.....................................................739
Appendix A Basic Treatment Receiving Waters............................................................................................741
Appendix B Procedure for Conducting a Pilot Infiltration Test...................................................................743
Appendix C Geotextile Specifications............................................................................................................745
Appendix D Turbulence and Short-Circuiting Factor....................................................................................747
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xi Table of Contents
Volume VI: Low Impact Development and On-Site Stormwater Management..................................749
Purpose of this Volume....................................................................................................................................749
Content and Organization of this Volume......................................................................................................749
Chapter 1 General Requirements................................................................................................................750
1.1 Objectives............................................................................................................................................................750
1.2 Site Assessment..................................................................................................................................................750
1.3 Site Planning and Layout.....................................................................................................................................750
1.4 Retain Native Vegetation.....................................................................................................................................751
1.5 Minimize Clearing and Grading Impacts..............................................................................................................751
Chapter 2 Low Impact Development Best Management Practices...........................................................752
2.1 Application...........................................................................................................................................................752
2.2 Best Management Practices................................................................................................................................752
2.2.1 Dispersion and Soil Quality BMPs.........................................................................................................753
2.2.2 Site Design BMPs.................................................................................................................................769
2.2.3 Low Impact Development BMPS...........................................................................................................771
Glossary ......................................................................................................................................................789
References ......................................................................................................................................................830
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xii Figures
Figures
Figure I-3-1. Determining Minimum Requirements for New and Redevelopment Project Sites.................15
Figure I-3-2. Determining Minimum Requirements for Flow Control..........................................................16
Figure I-3-3. Determining Minimum Requirements for Road-Related Projects..........................................20
Figure II-3-1. Stake and Wire Fence.........................................................................................................140
Figure II-3-2. Stabilized Construction Entrance........................................................................................142
Figure II-3-3. Small-Site Stabilized Construction Entrance.......................................................................143
Figure II-3-4. Wheel Wash........................................................................................................................145
Figure II-3-5. Nets and Blankets – Slope Installation................................................................................159
Figure II-3-6. Nets and Blankets – Channel Installation...........................................................................160
Figure II-3-7. Soil Erosion Protection – Plastic Covering..........................................................................163
Figure II-3-8. Surface Roughening by Tracking and Contour Furrows.....................................................174
Figure II-3-9. Gradient Terraces...............................................................................................................176
Figure II-3-10. Temporary Concrete Washout Facility..............................................................................188
Figure II-3-11. Prefabricated Concrete Washout Container with Ramp...................................................189
Figure II-3-12. Typical Grass-Lined Channels..........................................................................................201
Figure II-3-13. Temporary Channel Liners................................................................................................202
Figure II-3-14. Soil Erosion Protection – Rip Rap Protection....................................................................204
Figure II-3-15. Pipe Slope Drains..............................................................................................................209
Figure II-3-16. Cross-Section of a Level Spreader...................................................................................214
Figure II-3-17. Detail of a Level Spreader.................................................................................................214
Figure II-3-18. Check Dams......................................................................................................................217
Figure II-3-19. Sediment Barrier – Triangular Sediment Filter Dikes........................................................220
Figure II-3-20. Sediment Barrier – Geosynthetic Dike..............................................................................221
Figure II-3-21. No Figure Placeholder.......................................................................................................223
Figure II-3-22. Drop Inlet with Block and Gravel Filter..............................................................................227
Figure II-3-23. Gravel and Wire Mesh Filter..............................................................................................228
Figure II-3-24. Catchbasin Filter...............................................................................................................229
Figure II-3-25. Block and Gravel Curb Inlet Protection.............................................................................231
Figure II-3-26. Curb and Gutter Sediment Barrier.....................................................................................233
Figure II-3-27. Brush Barrier.....................................................................................................................235
Figure II-3-28. Silt Fence...........................................................................................................................241
Figure II-3-29. Silt Fence Installation by Slicing........................................................................................242
Figure II-3-30. Straw Wattles....................................................................................................................246
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xiii Figures
Figure II-3-31. Cross-Section of a Sediment Trap....................................................................................250
Figure II-3-32. Sediment Trap Outlet........................................................................................................250
Figure II-3-33. Sediment Pond..................................................................................................................255
Figure II-3-34. Sediment Pond Cross Section..........................................................................................255
Figure II-3-35. Sediment Pond Riser Detail..............................................................................................256
Figure II-3-36. Riser Inflow Curves...........................................................................................................257
Figure II-3-37. Floating Platform with Struts.............................................................................................260
Figure II-C-38. Sample Erosion and Sediment Control Plan....................................................................283
Figure II-C-39. Construction Entrance......................................................................................................291
Figure II-C-40. Stake and Wire Fence......................................................................................................292
Figure II-C-41. Sediment Barrier – Silt Fence...........................................................................................293
Figure II-C-42. Sediment Barrier – Triangular Sediment Filter Dikes.......................................................294
Figure II-C-43. Sediment Barrier – Geosynthetic Dike.............................................................................295
Figure II-C-44. Sediment (Berm) Barrier – Straw Wattle Rolls.................................................................296
Figure II-C-45. Sediment (Berm) Barrier – Sandbag Berm.......................................................................297
Figure II-C-46. Catch Basin Protection – Bag Filter..................................................................................298
Figure II-C-47. Catch Basin Protection – Inlet Gravel and Filter Fabric...................................................299
Figure II-C-48. Water Runoff Containment/Control – Sediment Trap Cross-Section...............................300
Figure II-C-49. Water Runoff Containment/Control – Sediment Trap Outlet............................................301
Figure II-C-50. Water Runoff Containment/Control – Drainage Swale Cross-Sections...........................302
Figure II-C-51. Soil Erosion Protection – Erosion Blankets and Turf Reinforcement Mats......................303
Figure II-C-52. Soil Erosion Protection – Rip Rap Protection...................................................................304
Figure II-C-53. Soil Erosion Protection – Pipe Slope Drains....................................................................305
Figure II-C-54. Soil Erosion Protection – Tarp Covering..........................................................................306
Figure III-2-1. Typical Downspout Infiltration Trench................................................................................316
Figure III-2-2. Alternative Downspout Infiltration Trench System for Coarse Sand and Gravel...............317
Figure III-2-3. Typical Downspout Dispersion Trench...............................................................................318
Figure III-2-4. Typical Infiltration Pond/Basin............................................................................................328
Figure III-2-5. USDA Textural Triangle.....................................................................................................337
Figure III-2-6. Observation Well Details....................................................................................................350
Figure III-2-7. Typical Detention Pond......................................................................................................353
Figure III-2-8. Typical Detention Pond Sections.......................................................................................354
Figure III-2-9. Overflow Structure..............................................................................................................355
Figure III-2-10. Examples of Permanent Surface Water Control Pond Sign............................................359
Figure III-2-11. Weir Section for Emergency Overflow Spillway...............................................................367
Figure III-2-12. Typical Detention Tank.....................................................................................................368
Figure III-2-13. Detention Tank Access Detail..........................................................................................369
Figure III-2-14. Typical Detention Vault....................................................................................................372
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xiv Figures
Figure III-2-15. Flow Restrictor (TEE).......................................................................................................380
Figure III-2-16. Flow Restrictor (Baffle).....................................................................................................381
Figure III-2-17. Flow Restrictor (Weir).......................................................................................................382
Figure III-2-18. Simple Orifice...................................................................................................................383
Figure III-2-19. Rectangular, Sharp-Crested Weir....................................................................................383
Figure III-2-20. V-Notch, Sharp-Crested Weir...........................................................................................384
Figure III-2-21. Sutro Weir.........................................................................................................................384
Figure III-2-22. Riser Inflow Curves..........................................................................................................385
Figure III-3-23. Nomograph for Sizing Circular Drains Flowing Full.........................................................399
Figure III-3-24. Circular Channel Ratios...................................................................................................401
Figure III-3-25. Backwater Calculation Sheet...........................................................................................403
Figure III-3-26. Backwater Pipe Calculation Example ..............................................................................405
Figure III-3-27. Debris Barrier...................................................................................................................412
Figure III-3-28. Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control............................415
Figure III-3-29. Headwater Depth for Corrugated Pipe Culverts with Inlet Control...................................416
Figure III-3-30. Junction Head Loss in Structures....................................................................................419
Figure III-3-31. Head for Culverts (Pipe W/”N”=0.012) Flowing Full with Outlet Control..........................420
Figure III-3-32. Head for Culverts (Pipe W/”N”=0.024) Flowing Full with Outlet Control..........................421
Figure III-3-33. Critical Depth of Flow for Circular Culverts......................................................................422
Figure III-3-34. Ditches – Common Section..............................................................................................427
Figure III-3-35. Drainage Ditches – Common Sections ............................................................................428
Figure III-3-36. Geometric Elements of Common Sections......................................................................429
Figure III-3-37. Open Channel Flow Profile Computation.........................................................................433
Figure III-3-38. Direct Step Backwater Method – Example.......................................................................434
Figure III-3-39. Mean Channel Velocity vs Medium Stone Weight (W50) and Equivalent
Stone Diameter.................................................................................................................438
Figure III-3-40. Riprap Gradation Curve...................................................................................................439
Figure III-3-41. Pipe/Culvert Outfall Discharge Protection........................................................................443
Figure III-3-42. Flow Dispersal Trench......................................................................................................444
Figure III-3-43. Alternative Flow Dispersal Trench...................................................................................445
Figure III-3-44. Gabion Outfall Detail........................................................................................................446
Figure III-3-45. Diffuser TEE (an example of energy dissipating end feature).........................................447
Figure IV-4-1. Pressure Wash Water Recovery System..........................................................................474
Figure IV-4-2. Drip Pan.............................................................................................................................484
Figure IV-4-3. Drip Pan Within Rails.........................................................................................................485
Figure IV-4-4. Loading Dock with Door Skirt.............................................................................................487
Figure IV-4-5. Loading Dock with Overhang.............................................................................................487
Figure IV-4-6. Oil/Water Separator Layout...............................................................................................489
Figure IV-4-7. Covered Fuel Island...........................................................................................................490
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xv Figures
Figure IV-4-8. Surrounding Activities Containing Oversized Equipment..................................................493
Figure IV-4-9. Enclose the Activity............................................................................................................518
Figure IV-4-10. Cover the Activity.............................................................................................................518
Figure IV-4-11. Covered Storage Area for Bulk Solids (including berm if needed)..................................520
Figure IV-4-12. Material Covered with Plastic Sheeting...........................................................................521
Figure IV-4-13. Secondary Containment Vessel......................................................................................530
Figure IV-4-14. Locking System for Drum Lid...........................................................................................531
Figure IV-4-15. Covered and Bermed Containment Area.........................................................................531
Figure IV-4-16. Mounted Container..........................................................................................................531
Figure IV-4-17. Above-Ground Tank Storage...........................................................................................534
Figure IV-4-18. Hydrant Flushing..............................................................................................................567
Figure IV-4-19. Examples of Covered Activities.......................................................................................573
Figure IV-4-20. Tarp Covering..................................................................................................................574
Figure IV-4-21. Paved Area with Sump Drain...........................................................................................575
Figure IV-4-22. Above-Ground Tank with Impervious Walls and Floor....................................................577
Figure IV-4-23. Containment Types..........................................................................................................578
Figure IV-4-24. Standby Generator...........................................................................................................579
Figure V-3-1. Flow Splitter, Option A........................................................................................................625
Figure V-3-2. Flow Splitter, Option B........................................................................................................626
Figure V-3-3. Flow Spreader Option A – Anchored Plate.........................................................................628
Figure V-3-4. Flow Spreader Option B – Concrete Sump Box.................................................................629
Figure V-3-5. Flow Spreader Option C – Notched Curb Spreader...........................................................630
Figure V-3-6. Flow Spreader Option D – Through-Curb Ports.................................................................631
Figure V-5-7. Observation Well Details.....................................................................................................649
Figure V-6-8. Sand Filtration Basin Preceded by Presettling Basin (Variation of a Basic Sand Filter)....651
Figure V-6-9. Sand Filter with a Pretreatment Cell (top view)..................................................................652
Figure V-6-10. Sand Filter with a Pretreatment Cell (side view)...............................................................653
Figure V-6-11. Sand Filter with Level Spreader (top view).......................................................................654
Figure V-6-12. Sand Filter with Level Spreader (side view).....................................................................655
Figure V-6-13. Sand Filter Vault (top view)...............................................................................................662
Figure V-6-14. Sand Filter Vault (side view).............................................................................................663
Figure V-6-15. Linear Sand Filter..............................................................................................................665
Figure V-7-16. Typical Swale Section.......................................................................................................667
Figure V-7-17. Geometric Formulas for Common Swale Shapes............................................................669
Figure V-7-18. The Relationship of Manning’s n with VR for Various Degrees of
Flow Retardance (A-E).....................................................................................................675
Figure V-7-19. Biofiltration Swale Underdrain Detail................................................................................677
Figure V-7-20. Biofiltration Swale Low-Flow Drain Detail.........................................................................677
Figure V-7-21. Swale Dividing Berm.........................................................................................................678
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xvi Figures
Figure V-7-22. Biofiltration Swale Access Features.................................................................................682
Figure V-7-23. Typical Filter Strip.............................................................................................................687
Figure V-7-24. Filter Strip Lengths for Narrow Right-of-Way....................................................................690
Figure V-8-25. Wetpond (top view)...........................................................................................................693
Figure V-8-26. Wetpond (side view).........................................................................................................694
Figure V-8-27. Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control.............................697
Figure V-8-28. Headwater Depth for Corrugated Pipe Culverts with Inlet Control...................................698
Figure V-8-29. Critical Depth of Flow for Circular Culverts.......................................................................699
Figure V-8-30. Circular Channel Ratios....................................................................................................700
Figure V-8-31. Wetvault............................................................................................................................709
Figure V-8-32. Stormwater Wetland – Option 1........................................................................................717
Figure V-8-33. Stormwater Wetland – Option 2........................................................................................718
Figure V-8-34. Combined Detention and Wetpond (top view)..................................................................721
Figure V-8-35. Combined Detention and Wetpond (side view)................................................................722
Figure V-8-36. Alternative Configurations of Detention and Wetpool Areas............................................725
Figure V-9-37. API (Baffle Type) Separator..............................................................................................728
Figure V-9-38. Coalescing Plate Separator..............................................................................................729
Figure V-9-39. Spill Control Separator (not for oil treatment)...................................................................730
Figure V-D-40. Recommended Values of F for Various Values of vH/Vt..................................................747
Figure VI-2-1. Typical Dispersion Trench.................................................................................................756
Figure VI-2-2. Standard Dispersion Trench with Notched Grade Board..................................................757
Figure VI-2-3. Typical Downspout Splashblock Dispersion......................................................................758
Figure VI-2-4. Typical Concentrated Flow Dispersion for Steep Driveways.............................................760
Figure VI-2-5. Sheet Flow Dispersion for Driveways................................................................................762
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xvii Tables
Tables
Table I-D-1. Maintenance Standards..........................................................................................................55
Table I-E-2. Water Quality Ranges Found in Study Wetlands..................................................................100
Table II-3-1. Temporary Erosion Control Seed Mix..................................................................................152
Table II-3-2. Landscaping Seed Mix.........................................................................................................152
Table II-3-3. Low-Growing Turf Seed Mix.................................................................................................152
Table II-3-4. Bioswale Seed Mix...............................................................................................................152
Table II-3-5. Wet Area Seed Mix...............................................................................................................153
Table II-3-6. Meadow Seed Mix................................................................................................................153
Table II-3-7. Mulch Standards and Guidelines..........................................................................................155
Table II-3-8. Materials on Hand................................................................................................................179
Table II-3-9. Storm Drain Inlet Protection.................................................................................................224
Table II-3-10. Geotextile Standards..........................................................................................................237
Table II-3-11. Vegetated Strips.................................................................................................................243
Table II-3-12. Sediment Trap Sizing.........................................................................................................249
Table II-C-13. Sediment Trap Sizing.........................................................................................................286
Table II-C-14. Temporary Erosion Control Seed Mix................................................................................289
Table II-C-15. Mulch Standards and Guidelines.......................................................................................290
Table III-1-1. BMP Designs in Western Washington................................................................................308
Table III-1-2. Runoff Curve Numbers for Selected Agricultural, Suburban and Urban Areas..................311
Table III-2-3. Bioretention Soil Mix Aggregate Component......................................................................323
Table III-2-4. Sizing Table for Rain Gardens............................................................................................325
Table III-2-5. Modeling Assumptions for Rain Garden Sizing...................................................................326
Table III-2-6. Infiltration Rate Reduction Factors to Account for Biofouling and Siltation
Effects for Ponds................................................................................................................333
Table III-2-7. Recommended Infiltration Rates based on USDA Soil Textural Classification...................340
Table III-2-8. Alternative Recommended Infiltration Rates Based on ASTM Gradation Testing..............341
Table III-2-9. Correction Factors to be Used with In-Situ Infiltration Measurements to Estimate
Long-Term Design Infiltration Rates..................................................................................342
Table III-2-10. Permanent Surface Water Control Pond Sign Specifications...........................................359
Table III-2-11. Plant Selection Guide........................................................................................................363
Table III-2-12. Values of Cd for Sutro Weirs.............................................................................................379
Table III-3-13. Percentage Impervious for Fully Developed Conditions Offsite Tributary Areas..............389
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xviii Tables
Table III-3-14. Runoff Coefficients – “C” Values for the Rational Method................................................391
Table III-3-15. Coefficients for the Rational Method.................................................................................392
Table III-3-16. Rainfall Intensities for the City of Auburn..........................................................................393
Table III-3-17. “n” and “k” Values Used in Time Calculations for Hydrographs........................................395
Table III-3-18. Percentage Impervious for Modeling Fully Developed Conditions....................................397
Table III-3-19. Manning’s “n” Values for Pipes..........................................................................................400
Table III-3-20. Backwater Calculation Sheet Notes..................................................................................404
Table III-3-21. Maximum Pipe Slopes, Velocities and Anchor Requirements..........................................408
Table III-3-22. Allowable Structures and Pipe Sizes.................................................................................408
Table III-3-23. Constants for Inlet Control Equations*..............................................................................417
Table III-3 24. Entrance Loss Coefficients................................................................................................423
Table III-3-25. Values of the Roughness Coefficient “n”...........................................................................430
Table III-3-26. Channel Protection............................................................................................................431
Table III-3-27. Rock Protection at Outfalls................................................................................................440
Table III-3-28. Additional Storm Drain Easement Widths.........................................................................451
Table III-A-29. Design Storm Precipitation Values...................................................................................452
Table IV-4-1. Uncovered Fuel Island Separator Sizing Requirements.....................................................491
Table IV-D-2. Typical TPH Levels in Street Sweeping and Catch Basin Solids.......................................597
Table IV-D-3. Typical c-PAH Values in Street Waste Solids and Related Materials................................598
Table IV-D-4. Typical Metals Concentrations in Catch Basin Sediments.................................................598
Table IV-D-5. Recommended Parameters & Suggested Values for Determining Reuse
& Disposal Options.............................................................................................................599
Table IV-D-6. Recommended Sampling Frequency for Street Waste Solids...........................................600
Table IV-D-7. Pollutants in Catch Basin Solids – Comparison to Dangerous Waste Criteria..................600
Table IV-D-8. Typical Catch Basin Decant Values Compared to Surface Water Quality Criteria............601
Table IV-D-9. Typical Values for Conventional Pollutants in Catch Basin Decant...................................601
Table IV-D-10. Catch Basin Decant Values Following Settling................................................................602
Table V-1-1. Screening Treatment Facilities Based on Soil Type............................................................609
Table V-2-2. Treatment Trains for Phosphorus Removal.........................................................................612
Table V-2-3. Treatment Trains for Enhanced Treatment..........................................................................613
Table V-3-4. Treatment Facility Placement in Relation to Detention Facilities.........................................618
Table V-3-5. Lining Types Recommended for Runoff Treatment Facilities..............................................621
Table V-3-6. Acceptable Gradation for Compacted Till Liners.................................................................623
Table V-6-7. Sand Specifications..............................................................................................................658
Table V-6-8. Clay Liner Specifications......................................................................................................658
Table V-7-9. Sizing Criteria.......................................................................................................................670
Table V-7-10. Stability Check Steps (SC) Guide for Selecting Degree of Retardance..........................674
Table V-7-11. Guide to Selecting Maximum Permissible Swale Velocities for Stability...........................675
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
xix Tables
Table V-7-12. Grass Seed Mixes Suitable for Biofiltration Swale Treatment Areas.................................680
Table V-7-13. Groundcovers & Grasses Suitable for the Upper Side Slopes of a Biofiltration
Swale in Western Washington...........................................................................................680
Table V-7-14. Recommended Plants for Wet Biofiltration Swale.............................................................681
Table V-8-15. Emergent Wetland Species Recommended for Wetponds...............................................706
Table V-8-16. Distribution of Depths in Wetland Cell...............................................................................719
Table V-B-17. Correction Factors to be Used with In-Situ Infiltration Measurements to Estimate
Long-Term Design Infiltration Rates..................................................................................744
Table V-C-18. Geotextile Properties for Underground Drainage Survivability Properties
(WSDOT 2008 Standard Specifications or most current version).....................................745
Table V-C-19. Geotextile for Underground Drainage Filtration Properties (WSDOT 2008 Standard
Specifications or most current version)..............................................................................745
Table V-C-20. Geotextile Strength Properties for Impermeable Liner Protection.....................................746
Table VI-2-1. Bioretention Soil Mix Aggregate Component......................................................................774
Table VI-2-2. Sizing Table for Rain Gardens............................................................................................777
Table VI-2-3. Modeling Assumptions for Rain Garden Sizing..................................................................778
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
1 Preface
Preface
This manual provides guidance on the measures necessary to control the quantity and quality of
stormwater produced by new development and redevelopment. This guidance contributes to the
protection of receiving waters and is in compliance with the Washington State Department of Ecology
(Ecology) water quality standards. These water quality standards include:
• Chapter 173-200 WAC, Water Quality Standards for Groundwaters of the State of
Washington
• Chapter 173-201A, Water Quality Standards for Surface Waters of the State of
Washington
• Chapter 173-204, Sediment Management Standards
Objective
The objective of this manual is to establish minimum requirements for development and
redevelopment projects of all sizes in the City of Auburn. It does this by providing guidance
concerning how to prepare and implement stormwater site plans. The minimum requirements are
satisfied by the application of Best Management Practices (BMPs). This manual is applicable to all
types of land development – including residential, commercial, industrial, and roads.
This manual can also be helpful in identifying options for retrofitting BMPs at existing development
sites where appropriate. In such situations, application of BMPs from this manual is encouraged. The
City recognizes, however, that there can be site constraints that make the strict application of these
BMPs difficult.
This manual is designed to be equivalent to Ecology’s 2005 Stormwater Management Manual for
Western Washington. Ecology considers its manual to include all known, available and reasonable
methods of prevention, control, and treatment (AKART). Ecology’s manual has no independent
regulatory authority. However, Ecology has required as a condition of the City’s General Permit for
Discharges from Municipal Separate Storm Sewers, the adoption of stormwater program
components that are the substantial equivalent to the minimum requirements found in Ecology’s
2005 manual.
The primary reason for using BMPs is to protect beneficial uses of water resources through the
reduction of pollutant loads and concentrations, and through reduction of discharges (volumetric flow
rates) causing stream channel erosion. If it is found that, after the implementation of BMPs advocated
in this manual, beneficial uses are still threatened or impaired, additional controls may be appropriate.
To accomplish these objectives the manual includes the following:
• Minimum Requirements that cover a range of issues, such as preparation of
Stormwater Site Plans, pollution prevention during the construction phase of a
project, control of potential pollutant sources, treatment of runoff, control of
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
2 Preface
stormwater flow volumes, protection of wetlands, and long-term operation and
maintenance. The Minimum Requirements applicable to a project vary depending on
the type and size of the proposed project.
• Best Management Practices (BMPs) that can be used to meet the minimum
requirements. BMPs are defined as schedules of activities, prohibitions of practices,
maintenance procedures, managerial practices, or structural features that prevent or
reduce adverse impacts to waters of Washington State. BMPs are divided into those
for short-term control of stormwater from construction sites, and those addressing
long-term management of stormwater at developed sites. Long-term BMPs are
further subdivided into those covering management of the volume and timing of
stormwater flows, prevention of pollution from potential sources, and treatment of
runoff to remove sediment and other pollutants.
• Guidance on how to prepare and implement Stormwater Site Plans. The
Stormwater Site Plan is a comprehensive report that describes existing site
conditions, explains development plans, examines potential offsite effects, identifies
applicable Minimum Requirements, and proposes stormwater controls for both the
construction phase and long-term stormwater management. The project proponent
submits the Stormwater Site Plan to the City of Auburn for review, and the City uses
the plan to evaluate a proposed project for compliance with stormwater
requirements.
It is not the intent of this manual to make the City of Auburn a guarantor or protector of public or
private property with regard to land development activities.
Organization of this Manual
The Surface Water Management Manual is divided into six volumes:
• Volume I defines the geographic scope of the manual, provides the information on
stormwater flow and quality control, and describes how to prepare and implement a
Stormwater Site Plan.
• Volume II describes BMPs for short-term stormwater management at construction
sites.
• Volume III covers hydrologic analysis and BMPs to control flow volumes from
developed sites.
• Volume IV describes BMPs to minimize pollution generated by potential pollution
sources at developed sites.
• Volume V presents BMPs to treat runoff that contains sediment or other pollutants
from developed sites.
• Volume VI presents BMPs for low impact development.
A Glossary at the end of the manual defines terminology used in all six volumes. A list of
References provides both source documentation and a list of additional information resources.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
3 Preface
How to Use this Manual
This manual is designed for a variety of users.
Project proponents should start by reviewing the minimum requirements described in
Volume I. Volume I also describes a Stormwater Site Plan and provides guidance on
how to develop this plan.
City staff will use this manual to review Stormwater Site Plans, check BMP designs
and provide technical advice to project proponents. City staff will also use this
manual as a reference when designing public works projects. All development and
redevelopment projects within the City of Auburn shall meet the requirements of this
manual unless specifically exempted by this manual or the City Engineer.
The City Engineer shall have authority to modify requirements to protect the health,
safety or welfare of the public on the basis of information regarding threatened water
quality, erosion problems or potential habitat destruction, flooding, protection of
uninterruptible services, or endangerment to property. The City Engineer shall also
have the authority to modify requirements based upon increases in requirements
imposed by state or federal agencies, where existing requirements are not applicable
to the particular site, or other pertinent factors.
Permits may refer to this manual or the BMPs contained in this manual. In those
cases, affected permit-holders or applicants should use this manual for specific
guidance on how to comply with those permit conditions.
Where requirements in this manual are also mandated by any other law, ordinance, resolution, rule
or regulation, the more restrictive requirement shall apply.
Note: Drawing and detail figures included throughout these volumes are intended for
illustrative purposes only. Where any discrepancy exists between figure elements and
specific design criteria, the design criteria shall take precedence.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
4 Preface
Development of Best Management Practices (BMPs) for
Stormwater Management
The method by which this manual controls the adverse impacts of development and redevelopment
is through the application of Best Management Practices.
Best Management Practices (BMPs)
Best Management Practices are defined as schedules of activities, prohibitions of practices,
maintenance procedures, and structural and/or managerial practices, that when used singly or in
combination, prevent or reduce the release of pollutants and other adverse impacts to waters of
Washington State. The types of BMPs are source control, treatment, and flow control. BMPs that
involve construction of engineered structures are often referred to as facilities in this manual. For
instance, the BMPs referenced in the menus of Chapter 2 in Volume 5 are called Treatment Facilities.
Source Control BMPs
Source control BMPs prevent or reduce pollution, or other adverse effects of stormwater, from
occurring. In this manual, source control BMPs are classified as operational or structural. Examples
of source control BMPs include methods as various as using mulches and covers on disturbed soil,
putting roofs over outside storage areas, and berming areas to prevent stormwater run-on and
pollutant runoff.
It is generally more cost-effective to use source controls to prevent pollutants from entering runoff
than to treat runoff to remove pollutants.
Treatment BMPs
Treatment BMPs include facilities that remove pollutants by simple gravity settling of particulate
pollutants, filtration, biological uptake, and soil adsorption. Treatment BMPs can accomplish
significant levels of pollutant load reductions if properly designed and maintained.
Flow Control BMPs
Flow control BMPs typically control the rate, frequency, and flow duration of stormwater surface
runoff. The need to provide flow control BMPs depends on whether a development site discharges to
a stream system or wetland, either directly or indirectly. Stream channel erosion control can be
accomplished by BMPs that detain runoff flows and also by those which physically stabilize eroding
stream banks. Both types of measures may be necessary. Only the former is covered in this manual.
The size of such a facility can be reduced by changing the extent to which a site is disturbed.
In regard to wetlands, it is necessary to not alter the natural hydroperiod. This means control of flows
from a development such that the wetland is within certain elevations at different times of the year
and short-term elevation changes are within the prescribed limits. If, however, the wetland was fed by
local groundwater elevations during the dry season, the impervious surface additions and the
bypassing practice may cause variations from the dry season elevations which might need mitigation.
The city has additional requirements that are related to surface water management, including
wetlands, critical areas, and flood protection. Refer to the City of Auburn Code.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
5 Preface
Related Documentation
Department of Ecology’s Stormwater Management Manual
This manual was modeled after the Stormwater Management Manual for Western Washington,
published by the Department of Ecology in February, 2005. Ecology’s stormwater manual was
originally developed in response to a directive of the Puget Sound Water Quality Management Plan
(PSWQA 1987 et seq.). The Puget Sound Water Quality Authority (since replaced by the Puget
Sound Partnership) recognized the need for overall guidance for stormwater quality improvement. It
incorporated requirements in its plan to implement a cohesive, integrated stormwater management
approach through the development and implementation of programs by local jurisdictions, and the
development of rules, permits and guidance by Ecology.
The Puget Sound Water Quality Management Plan included a stormwater element (SW-2.1)
requiring Ecology to develop a stormwater technical manual for use by local jurisdictions. Ecology’s
original stormwater manual (the Stormwater Management Manual for the Puget Sound Basin,
published in 1992) was developed to meet this requirement. In the years hence Ecology updated its
stormwater management guidance and requirements applicable to all of western Washington. Refer
to Volume I, Appendix A for the regulatory requirements which support the relationship between the
Auburn manual and Ecology’s manual.
Applicable Federal, State and Local Regulatory Requirements
Refer to Volume I, Appendix A for all applicable federal, state, and local regulatory requirements for
this manual.
• Endangered Species Act
• Section 401 Water Quality Certifications
• Puget Sound Water Quality Management Plan
• Ecology NPDES Program
• Hydraulic Project Approvals
• Aquatic Lands Use Authorizations
• Watershed/Basin Planning
• Total Maximum Daily Loads
• Underground Injection Control Authorization
THIS PAGE INTENTIONALLY LEFT BLANK.
Volume I
Table of Contents
Volume I – Stormwater
Site Planning
Table of Contents
Purpose of this Volume .................................................................................................................. 7
Content and Organization of this Volume........................................................................................ 7
Chapter 1 Development and Redevelopment Impacts ........................................................8
1.1 Hydrologic Changes.............................................................................................................. 8
1.2 Water Quality Changes ......................................................................................................... 8
1.3 Biological Changes ............................................................................................................... 9
Chapter 2 Areas with Special Development Requirements ..............................................10
2.1 Groundwater Protection Area 2 ........................................................................................... 10
2.2 Impaired Water Bodies ....................................................................................................... 10
2.3 Floodplains ......................................................................................................................... 10
Chapter 3 Minimum Requirements for New Development and Redevelopment..............11
3.1 Overview of the Minimum Requirements ............................................................................. 11
3.2 Exemptions ......................................................................................................................... 12
3.2.1 Road Maintenance ....................................................................................................... 12
3.2.2 Parking Lots and Parking Lot Maintenance ................................................................... 12
3.2.3 Underground Utility Projects ......................................................................................... 13
3.2.4 Minor Clearing and Grading .......................................................................................... 13
3.2.5 Emergencies ................................................................................................................ 13
3.2.6 Key Terms .................................................................................................................... 13
3.3 Applicability of the Minimum Requirements ......................................................................... 14
3.3.1 New Development ........................................................................................................ 17
3.3.2 Redevelopment ............................................................................................................ 17
3.3.3 Assessed Value ............................................................................................................ 18
3.3.4 Roads........................................................................................................................... 18
3.3.5 Cumulative Impact Mitigation Requirement ................................................................... 19
3.4 Description of Minimum Requirements ................................................................................ 21
3.4.1 Minimum Requirement #1: Preparation of a Stormwater Site Plan ................................. 21
3.4.1.1 Objective ............................................................................................................. 21
3.4.2 Minimum Requirement #2: Construction Stormwater Pollution Prevention (SWPP) ....... 21
3.4.2.1 Objective ............................................................................................................. 22
3.4.3 Minimum Requirement #3: Source Control of Pollution.................................................. 22
Volume I
Table of Contents
3.4.3.1 Objective ............................................................................................................. 22
3.4.4 Minimum Requirement #4: Preservation of Natural Drainage Systems and Outfalls....... 23
3.4.4.1 Objective ............................................................................................................. 23
3.4.5 Minimum Requirement #5: On-Site Stormwater Management ....................................... 23
3.4.5.1 Objective ............................................................................................................. 23
3.4.6 Minimum Requirement #6: Runoff Treatment ................................................................ 24
3.4.6.1 Thresholds .......................................................................................................... 24
3.4.6.2 Treatment Facility Selection, Design, and Maintenance ....................................... 24
3.4.6.3 Additional Requirements ..................................................................................... 24
3.4.6.4 Objective ............................................................................................................. 24
3.4.6.5 Supplemental Guidelines..................................................................................... 24
3.4.7 Minimum Requirement #7: Flow Control ....................................................................... 25
3.4.7.1 Applicability ......................................................................................................... 25
3.4.7.2 Thresholds .......................................................................................................... 25
3.4.7.3 Standard Requirement ........................................................................................ 26
3.4.7.4 Infrastructure Protection Requirement ................................................................. 26
3.4.7.5 Objective ............................................................................................................. 27
3.4.7.6 Modeling Requirements ...................................................................................... 27
3.4.8 Minimum Requirement #8: Wetlands Protection ............................................................ 27
3.4.8.1 Applicability ......................................................................................................... 27
3.4.8.2 Thresholds .......................................................................................................... 28
3.4.8.3 Standard Requirement ........................................................................................ 28
3.4.8.4 Additional Requirements ..................................................................................... 28
3.4.8.5 Objective ............................................................................................................. 29
3.4.8.6 Supplemental Guidelines..................................................................................... 29
3.4.9 Minimum Requirement #9: Operation and Maintenance ................................................ 29
3.4.9.1 Objective ............................................................................................................. 29
3.4.9.2 Supplemental Guidelines..................................................................................... 29
3.4.10 Minimum Requirement #10: Off-Site Analysis and Mitigation ......................................... 29
3.4.10.1 Qualitative Analysis: ............................................................................................ 30
3.4.10.2 Quantitative Analysis ........................................................................................... 30
3.4.10.3 Objective ............................................................................................................. 30
3.5 Exceptions .......................................................................................................................... 30
Chapter 4 Preparation of Stormwater Site Plans ...............................................................33
4.1 Stormwater Site Plan Outline .............................................................................................. 33
4.2 Plans Required After Stormwater Site Plan Approval........................................................... 40
4.3 Land Use Submittal Requirements ...................................................................................... 40
Appendix A Regulatory Requirements ...............................................................................41
Appendix B Stormwater Site Plan Submittal Requirements Checklist .............................46
Appendix C Hydraulic Analysis Worksheet ........................................................................53
Appendix D Maintenance Standards for Drainage Facilities ............................................55
Appendix E Wetlands and Stormwater Management Guidelines......................................85
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Purpose Volume I
Content and Organization Introduction 7
Volume I:
Stormwater Site Planning
Purpose of this Volume
This volume provides a discussion of the minimum requirements for stormwater management, and
information and guidance for preparing a Stormwater Site Plan. This includes an overview of the
impacts of development on water flow and quality, an overview of the affected watershed areas,
procedures for preparing the plan, and information helpful for selecting BMPs and facilities for
permanent stormwater management.
Content and Organization of this Volume
Volume I contains four chapters and five appendices.
• Chapter 1 describes the impacts of development and redevelopment on water flow
and quality.
• Chapter 2 describes areas with special development requirements
• Chapter 3 defines the minimum requirements for stormwater management for
development and redevelopment projects.
• Chapter 4 describes the Stormwater Site Plan, and provides step-by-step guidance
for preparing the plan.
• Appendix A provides information about regulatory requirements.
• Appendix B provides a checklist of stormwater site plan submittal requirements.
• Appendix C provides a hydraulic analysis worksheet.
• Appendix D describes maintenance standards for drainage facilities.
• Appendix E describes guidelines for wetlands and stormwater management.
Volume
I
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Development and Redevelopment Impacts Volume I
Chapter 1 8
Chapter 1 Development and Redevelopment Impacts
1.1 Hydrologic Changes
As settlement occurs and the population grows, trees are logged and land is cleared for the addition
of impervious surfaces such as rooftops, roads, parking lots, and sidewalks. Maintained landscapes
that have much higher runoff characteristics typically replace the natural vegetation. The natural soil
structure is also changed due to grading and compaction during construction. Roads are cut through
slopes and low spots are filled. Drainage patterns are irrevocably altered. All of this can result in
drastic changes in the natural hydrology, including:
• Increased volumetric flow rates of runoff
• Increased volume of runoff
• Decreased time for runoff to reach a natural receiving water
• Reduced groundwater recharge
• Increased frequency and duration of high stream flows and wetlands inundation
during and after wet weather
• Reduced stream flows and wetlands water levels during the dry season
• Greater stream velocities
• Adverse impacts on existing City infrastructure and capacity
1.2 Water Quality Changes
Urbanization also can cause an increase in the types and quantities of pollutants in surface and
groundwaters. Runoff from urban areas has been shown to contain many different types of
pollutants, depending on the nature of the activities in those areas. The runoff from roads and
highways can be contaminated with pollutants from vehicles. Oil and grease, polynuclear aromatic
hydrocarbons (PAHs), lead, zinc, copper, cadmium, as well as sediments (soil particles) and road
salts can be typical pollutants in road runoff. Runoff from industrial areas can contain many types of
heavy metals, sediments, and a broad range of man-made organic pollutants, including phthalates,
PAHs, and other petroleum hydrocarbons. Residential areas can contribute the same road-based
pollutants to runoff, as well as herbicides, pesticides, nutrients (from fertilizers), bacteria, and viruses
(from animal waste). All of these contaminants can seriously impair beneficial uses of receiving
waters.
Regardless of the eventual land use conversion, the sediment load produced by a construction site
can turn the receiving waters turbid and be deposited over the natural sediments of the receiving
water. The addition of sediment loads also impacts existing City systems, causing localized flooding
and increases in the cost and frequency of maintenance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Development and Redevelopment Impacts Volume I
Chapter 1 9
Urbanization can cause changes in water temperature. Heated stormwater from impervious surfaces
and exposed treatment and detention ponds may discharge to streams with less riparian vegetation
for shade. Urbanization also reduces groundwater recharge, which reduces sources of cool
groundwater inputs to streams. In winter, stream temperatures may lower due to loss of riparian
cover. There is also concern that the replacement of warmer groundwater inputs with colder surface
runoff during colder periods may have biological impacts.
1.3 Biological Changes
Hydrologic and water quality changes can result in changes to the biological systems that were
supported by the natural hydrologic system. In particular, aquatic life is greatly affected by
urbanization. Habitats are altered when a stream changes its physical configuration and substrate
due to increased flows. Natural riffles, pools, gravel bars and other areas can be altered or destroyed.
These and other alterations produce a habitat structure that is very different from the one in which the
resident aquatic life evolved.
The biological communities in wetlands also can be severely impacted and altered by the
hydrological changes. Relatively small changes in the natural water elevation fluctuations can cause
dramatic shifts in vegetative and animal species composition.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Areas with Special Development Volume I
Requirements Chapter 2 10
Chapter 2 Areas with Special Development Requirements
This chapter identifies geographic areas within the City of Auburn and the requirements specific
to those areas. Theses requirements shall be in addition to the minimum requirements found in
Chapter 3 of this volume unless the text in this chapter specifically indicates that the area-
specific requirement supersedes or replaces a minimum requirement.
2.1 Groundwater Protection Area 2
In 2005, the City of Auburn adopted the Critical Areas Ordinance, ACC 16.10 which formally
designates Groundwater Protection Areas within the City of Auburn. Groundwater Protection
Zone 2 represents the land area in the central part of the city beneath which the principal aquifer
used by the city for water supply is overlain by highly permeable sand and gravel deposits.
These geologic conditions provide a direct pathway for contaminants that may be released to
the soil to reach the aquifer.
Private infiltration systems used in Groundwater Protection Zone 2 that receive stormwater from
any pollution-generating surfaces including streets, parking areas, or galvanized roofs are
prohibited unless in the opinion of the Public Works Department no other reasonable alternative
exists. In such case, the Public Works Department may approve a private disposal system.
Design shall meet all requirements of the Public Works Department. Additional water quality
measures may also be required.
To request infiltration of pollution-generating surfaces in Groundwater Protection Zone 2, a
formal request for exception shall be submitted per Section 3.5 for review and approval.
2.2 Impaired Water Bodies
Section 305(b) of the Clean Water Act (CWA) requires the Department of Ecology to prepare a
report every two years on the status of the overall condition of the state’s waters. Section 303(d)
of the CWA requires Ecology to prepare a list every two years containing water bodies not
expected to meet state surface water quality standards after implementation of technology-
based controls. The State is then required to complete a Total Maximum Daily Load (TMDL) for
all water on that list. The existing list and other related information is available on Ecology’s
water quality website:
http://www.ecy.wa.gov/programs/wq/links/wq_assessments.html
If a project site discharges to one of these listed waterbodies, additional treatment or flow
control requirements may apply.
2.3 Floodplains
Floodplains are not regulated through the Surface Water Management Manual. However,
surface water facilities proposed within flood plains will be reviewed on a case-by-case basis to
determine if the facilities are acceptable. Additional analysis and requirements may be needed
for surface water facilities located within flood plains.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 11
Chapter 3 Minimum Requirements for New Development
and Redevelopment
This Chapter identifies the minimum requirements for stormwater management applicable to new
development and redevelopment sites. These requirements are codified in Chapter 13.48 of the
Auburn City Code (ACC). New development and redevelopment projects also may be subject to
other City code requirements, depending on the nature and location of the project. These code
requirement may include, but are not limited to, the subdivision and land use permit procedures in
Titles 17 and 14 ACC; excavation and grading and off-site improvement Chapter 15.74 ACC;
driveway control Chapter 12.20 ACC; groundwater protection, Chapter 8.08 ACC; shoreline
regulation, Chapter 16.08 ACC; and critical areas preservation Chapter 16.10 ACC.
These requirements are intended to provide for and promote the health, safety and welfare of the
general public, and are not intended to create or otherwise establish or designate any particular class
or group of persons who will or should be especially protected or benefited by the provisions of this
chapter.
3.1 Overview of the Minimum Requirements
The Minimum Requirements are:
1. Preparation of Stormwater Site Plans
2. Construction Stormwater Pollution Prevention
3. Source Control of Pollution
4. Preservation of Natural Drainage Systems and Outfalls
5. On-site Stormwater Management
6. Runoff Treatment
7. Flow Control
8. Wetlands Protection
9. Operation and Maintenance
The City also has one additional requirement beyond those required in Ecology’s 2005 manual:
10. Off-Site Analysis and Mitigation
Depending on the type and size of the proposed project, different combinations of these minimum
requirements apply. In general, small sites are required to control erosion and sedimentation from
construction activities and to apply simpler approaches to treatment and flow control of stormwater
runoff from the developed site. Large sites must provide erosion and sedimentation control during
construction and permanent control of stormwater runoff from the developed site.
Section 3.4 provides additional information on applicability of the Minimum Requirements to different
types of sites.
This manual is designed to be equivalent to Ecology’s 2005 Stormwater Management Manual for
Western Washington. Ecology considers its manual to include all known, available, and reasonable
methods of prevention, control, and treatment (AKART). Ecology’s manual has no independent
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 12
regulatory authority. However, Ecology has required as a condition of the City’s General Permit for
Discharges from Municipal Separate Storm Sewers, the adoption of stormwater program
components that are the substantial equivalent to the minimum requirements found in Ecology’s
2005 manual.
The minimum requirements of this Chapter are conditions of the City’s stormwater NPDES permit,
and are required under Auburn City Code, Chapter 13.48 Storm Drainage Utility.
3.2 Exemptions
The following classes of projects have exemption from the minimum requirements. All other new
development or redevelopment projects are subject to one or more of the Minimum Requirements
(see Section 3.4).
3.2.1 Road Maintenance
The following road maintenance practices are exempt:
• pothole and square cut patching
• overlaying existing asphalt or concrete pavement with asphalt or concrete without
expanding the area of coverage
• shoulder grading
• reshaping/regrading drainage systems
• crack sealing
• resurfacing with in-kind material without expanding the road prism
• vegetation maintenance
3.2.2 Parking Lots and Parking Lot Maintenance
Parking lots are considered pollution generating impervious surfaces and must comply with all
relevant BMPs per the Minimum Requirements. Parking lot surfacing material requirements are
regulated through the City’s Land Use code. Parking lots must provide a design to control and
manage surface water per the minimum requirements. No special consideration will be given to
“temporary” parking areas as the impacts resulting from the proposed impervious surface must be
mitigated as part of the construction.
The following parking lot maintenance practices are exempt:
• pothole and square cut patching
• overlaying existing asphalt or concrete pavement with asphalt or concrete without
expanding the area of coverage
• crack sealing
• catch basin, pipe and vegetation maintenance
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 13
3.2.3 Underground Utility Projects
Underground utility projects that replace the ground surface with in-kind material or materials with
similar runoff characteristics are only subject to Minimum Requirement #2, Construction Stormwater
Pollution Prevention.
3.2.4 Minor Clearing and Grading
The following minor clearing and grading activities are exempt from all the Minimum Requirements
except for Minimum Requirement #2; unless located within a critical or sensitive area governed by
the City’s Critical Areas Ordinance. Information on Critical Areas is available through the City of
Auburn Planning Department.
• Excavation for wells, except that fill made with the material from such excavation
shall not be exempt;
• Exploratory excavations under the direction of soil engineers or engineering
geologists, except that fill made with the material from such excavation shall not be
exempt;
• Removal of hazardous trees;
• Removal of trees or other vegetation which cause sight distance obstructions at
intersections;
• Minor clearing and grading associated with cemetery graves;
• Land clearing associated with routine maintenance by public utility agencies, as long
as appropriate vegetation management practices are followed as described in the
Best Management Practices of the Regional Road Maintenance Endangered
Species Act Program Guidelines located at
http://www.wsdot.wa.gov/maintenance/roadside/esa.htm
3.2.5 Emergencies
Emergency projects which, if not performed immediately would substantially endanger life or
property, are exempt only to the extent necessary to meet the emergency. Emergency activities may
include but are not limited to: sandbagging, diking, ditching, filling, or similar work during or after
periods of extreme weather. Permits authorizing the emergency work may be required after
completion of the emergency project.
3.2.6 Key Terms
A few key words to be aware of pertaining to the requirements that follow are:
• Arterial
• Effective Impervious Surface
• Impervious Surface
• Land Disturbing Activity
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 14
• Maintenance
• Native Vegetation
• New Development
• Pollution-Generating Impervious Surface (PGIS)
• Pollution Generating Pervious Surfaces (PGPS)
• Pre-Developed Conditions
• Project Site
• Receiving Waters
• Redevelopment
• Replaced Impervious Surface
• Site
• Source Control BMP
• Threshold Discharge Area.
The definition of these and other stormwater-related words and phrases used in this manual are
provided in the Glossary.
3.3 Applicability of the Minimum Requirements
NOTE: Throughout this section, requirements are written in bold print. Supplemental guidelines
that serve as advice and other materials are not bolded.
Not all of the Minimum Requirements apply to every development or redevelopment project. The
applicability varies depending on the type and size of the project. This section Identifies thresholds
that determine the applicability of the Minimum Requirements to different projects. The thresholds
shall be determined using the proposed improvements for the entire project site.
The flow charts in Figure I-3-1, Figure I-3-2, and Figure I-3-3, can be used to determine which
requirements apply. The Minimum Requirements themselves are presented in Section 3.4.
Flow credits as outlined in Volume VI are used when determining project thresholds.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 15
Figure I-3-1. Determining Minimum Requirements for New and Redevelopment Project Sites
Do the new, replaced or new plus replaced impervious surfaces total
2,000 square feet or more?
OR
Does the project disturb 7,000 square feet or more of land?
Comply with Minimum Requirements
#1-#5 and #10
Continue to next questions
Comply with Minimum
Requirement #2
Does the project add 5,000 square feet or more of new impervious surface?
OR
Convert ¾ acres or more of native vegetation to lawn/landscaped?
OR
Convert 2.5 acres or more of native vegetation to pasture?
Minimum Requirements #1-#10 apply
to new impervious and converted
surfaces.
Continue to next questions
Is the total of new plus replaced impervious
surfaces 5,000 square feet or more and does the
value of the proposed improvements, including
interior improvements, exceed 50% of the
assessed value of the existing site improvements?
Minimum Requirements #1-#10 apply to
new impervious and replaced surfaces.
Continue to Fig. I-3-2 Flow Control chart No additional requirements
YES
YES
YES
NO
NO
NO
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 16
Figure I-3-2. Determining Minimum Requirements for Flow Control
Does the project total 10,000 square feet or more of effective impervious surfaces?
OR
Convert 2.5 acres or more of native vegetation to pasture?
OR
Convert ¾ acres or more of native vegetation to lawn or landscaped?
OR
Cause a 0.1 ft3/s increase in the 100-year flood frequency?
(Must use the WWHM model)
Does the project discharge directly
or indirectly into freshwater?
Flow control is not required. Provide
on-site stormwater management per
Minimum Requirement #5
Provide flow control per
Minimum Requirement #7
Flow control is not required.
Provide on-site stormwater
management per Minimum
Requirement #5
YES
YES
NO
NO
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 17
3.3.1 New Development
All new development shall be required to comply with Minimum Requirement #2.
The following new development shall comply with Minimum Requirements #1 through #5 for
the new and replaced impervious surfaces and the land disturbed:
• Creates or adds 2,000 square feet, or greater, of new, replaced, or new plus
replaced impervious surface area, or
• Has land disturbing activity of 7,000 square feet or greater.
The following new development shall comply with Minimum Requirements #1 through #10 for
the new impervious surfaces and the converted pervious surfaces.
• Creates or adds 5,000 square feet , or more, of new impervious surface area, or
• Converts ¾ acres, or more, of native vegetation to lawn or landscaped areas,
or
• Converts 2.5 acres, or more, of native vegetation to pasture.
3.3.2 Redevelopment
Redevelopment is development on a site that is already substantially developed (i.e., has 35% or
more existing impervious surface coverage). See the Glossary at the back of this manual for
definitions.
Redevelopment projects have the same requirements as new development projects in order to
minimize the impacts from new surfaces. To encourage redevelopment projects, replaced surfaces
are not required to be brought up to new stormwater standards unless the thresholds noted in
Section 3.3.3 are exceeded. As long as the replaced surfaces have similar pollution-generating
potential, the amount of pollutants discharged should not be significantly different. However, if the
redevelopment project scope is sufficiently large such that the thresholds noted in Section 3.3.3 are
exceeded, it is reasonable to require the replaced surfaces to be brought up to current stormwater
standards. This is consistent with other utility standards. When a structure or a property undergoes
significant remodeling, local governments often require the site to be brought up to new building code
requirements (e.g., onsite sewage disposal systems, fire systems).
All redevelopment shall be required to comply with Minimum Requirement #2. In addition, all
redevelopment that exceeds certain thresholds shall be required to comply with additional
Minimum Requirements as follows.
The following redevelopment shall comply with Minimum Requirements #1 through #5 for the
new and replaced impervious surfaces and the land disturbed:
• The new, replaced, or total of new plus replaced impervious surfaces is
2,000 square feet or more, or
• 7,000 square feet or more of land disturbing activities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 18
In addition to meeting Minimum Requirements #1 through #5, the following redevelopment
shall comply with Minimum Requirements #6 through #10 for the new impervious surfaces
and converted pervious areas:
• Adds 5,000 square feet or more of new impervious surfaces or,
• Converts ¾ acres, or more, of native vegetation to lawn or landscaped areas,
or
• Converts 2.5 acres, or more, of native vegetation to pasture.
If the runoff from the new impervious surfaces and converted pervious surfaces is not
separated from runoff from other surfaces on the project site, the stormwater treatment
facilities must be sized for the entire flow that is directed to them. The City may allow the
Minimum Requirements to be applied to an equivalent area (flow and pollution
characteristics) within the same site. For public road projects, the equivalent area does not
have to be within the project limits, but must drain to the same receiving water within the
watershed.
3.3.3 Assessed Value
Other types of redevelopment projects shall comply with all the Minimum Requirements for
the new and replaced impervious surfaces if the total of new plus replaced impervious
surfaces is 5,000 square feet or more, and the valuation of proposed improvements (materials
plus labor to construct) – including interior improvements – exceeds 50% of the assessed
value of the existing site improvements as determined from the latest available building
valuation data published by the International Code Council, available at
http://www.iccsafe.org/cs/techservices/index.html .
3.3.4 Roads
For road-related projects, runoff from the replaced and new impervious surfaces (including
pavement, shoulders, curbs, driveways, and sidewalks) shall meet all the Minimum
Requirements if the new impervious surfaces total 5,000 square feet or more and total 50% or
more of the existing impervious surfaces within the site (see Figure I-3-3). The site shall be
defined by the length of the project and the width of the right-of-way. For the purposes of this
manual, public roads (off-site improvements) required as part of a private project will be
considered part of the threshold area determination for the minimum requirements.
The following road maintenance practices are considered redevelopment. The extent to which
the manual applies is explained for each circumstance.
• Removing and replacing a paved surface to base course or lower, or repairing the
roadway base: If impervious surfaces are not expanded, Minimum Requirements #1
- #5 apply. However, in most cases, only Minimum Requirement #2, Construction
Stormwater Pollution Prevention, will be germane. Where appropriate, project
proponents are encouraged to look for opportunities to use permeable and porous
pavements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 19
• Extending the pavement edge without increasing the size of the road prism, or
paving graveled shoulders: These are considered new impervious surfaces and are
subject to the minimum requirements that are triggered when the thresholds
identified for redevelopment projects are met.
• Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; upgrading from
gravel to asphalt or concrete; or upgrading from a bituminous surface treatment
(“chip seal”) to asphalt or concrete. These are considered new impervious surfaces
and are subject to the minimum requirements that are triggered when the thresholds
identified for redevelopment projects are met.
3.3.5 Cumulative Impact Mitigation Requirement
The determination of thresholds for a project site shall be based on the total increase or
replacement of impervious surfaces that occurred after adoption of the 2009 SWMM. Under
this provision, the City will consider the cumulative impacts of all permits issued on or after
February 16, 2010. The combined total of new or replaced surfaces will be applied to the
thresholds that determine applicability of the Minimum Requirements.
The intent of this Cumulative Impact Mitigation Requirement is to adequately mitigate the stormwater
from improvements on a project site that are submitted under separate permits. The separate
submittals could have project areas that do not meet the thresholds, but would meet the thresholds if
the projects were combined as one project.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 20
Figure I-3-3. Determining Minimum Requirements for Road-Related Projects
Do the new, replaced, or new plus replaced impervious surfaces total
2,000 square feet or more?
OR
Does the project disturb 7,000 square feet or more of land?
Comply with Minimum Requirements
#1 through #5 and # 10
Continue to next questions
Comply with Minimum
Requirement #2
Does the project add 5,000 square feet or more of new impervious surface?
OR
Convert ¾ acres or more of native vegetation to lawn/landscape?
OR
Convert 2.5 acres or more of native vegetation to pasture?
Minimum Requirements #1 through
#10 apply to new impervious and
converted surfaces.
Continue to next questions
Does the project add 5,000 square feet or more
of new impervious surfaces?
AND
Do the new impervious surfaces add 50% or
more to the existing impervious surfaces within
the project limits?
Minimum Requirements #1 through
#10 apply to new impervious and
replaced surfaces. No additional requirements
YES
YES
YES
NO
NO
NO
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 21
3.4 Description of Minimum Requirements
NOTE: Throughout this Section, guidance to meet requirements is written in BOLD.
Supplemental guidelines that serve as advice and other materials are not written in bold.
This section describes the minimum requirements for stormwater management at new development
and redevelopment sites. Consult Section 3.3 to determine which requirements apply to any given
project.
Volumes II through VI of this manual present Best Management Practices (BMPs) for use in meeting
the Minimum Requirements.
3.4.1 Minimum Requirement #1: Preparation of a Stormwater Site Plan
All projects meeting the thresholds in Section 3.3 shall prepare a Stormwater Site Plan for
local government review. Stormwater Site Plans shall be prepared in accordance with
Chapter 4 of this volume.
A Stormwater Site Plan consists of an assessment of both temporary and permanent
stormwater and drainage impacts and may include a construction stormwater pollution
prevention plan, when required by Minimum Requirement #2.
3.4.1.1 Objective
To outline the existing and post-developed conditions of the project site, describe the proposed
stormwater facilities, and present the stormwater analysis.
3.4.2 Minimum Requirement #2: Construction Stormwater Pollution
Prevention (SWPP)
All new development and redevelopment shall comply with Construction SWPP Elements #1
through #12. A full description of these elements can be found in Volume II, Chapter 2.
Projects which meet or exceed the thresholds of Volume I, Section 3.3 must prepare a
Construction Stormwater Pollution Prevention Plan (SWPPP) as part of the Stormwater Site
Plan (see Section 3.4.1). Each of the twelve elements must be considered and included in the
Construction SWPPP unless site conditions render the element unnecessary and the
exemption from that element is clearly justified in the narrative of the SWPPP.
The City has developed a Construction SWPPP Short Form for projects that:
• Add or replace between 2,000 and 5,000 square feet of impervious surface, or
• Clear or disturb between 7,000 square feet and 1 acre of land.
The SWPPP Short Form is intended to take the place of the Construction SWPPP. A Certified
Erosion and Sediment Control Lead (CESCL) is not required for those projects using the
City’s Construction SWPPP Short Form.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 22
For all other projects requiring a Construction SWPPP, a CESCL shall be identified in the
Construction SWPPP and shall be on-site or on-call at all times. CESCLs must be trained
through an Ecology approved training program found at:
http://www.ecy.wa.gov/programs/wq/stormwater/cescl.htm
Unless located in a Critical Area, projects that add or replace less than 2,000 square feet of
impervious surface or disturb less than 7,000 square feet of land are not required to prepare a
Construction SWPPP, but must consider all of the twelve Elements of Construction
Stormwater Pollution Prevention (SWPP) and develop controls for all elements that pertain to
the project site.
SWPP Elements are:
Element 1: Mark Clearing Limits
Element 2: Establish Construction Access
Element 3: Control Flow Rates
Element 4: Install Sediment Controls
Element 5: Stabilize Soils
Element 6: Protect Slopes
Element 7: Protect Drain Inlets
Element 8: Stabilize Channels and Outlets
Element 9: Control Pollutants
Element 10: Control De-Watering
Element 11: Maintain BMPs
Element 12: Manage the Project
These Elements are described in detail in Volume II.
3.4.2.1 Objective
The purpose of construction SWPP is to control erosion and prevent sediment and other pollutants
from leaving the site during the construction phase of a project.
3.4.3 Minimum Requirement #3: Source Control of Pollution
All known, available, and reasonable source control BMPs shall be applied to all projects.
Source control BMPs shall be selected, designed, and maintained according to this manual.
Structural source control BMPs shall be identified in the stormwater site plan and shall be
shown on construction plans submitted for City review.
Source Control BMPs include Operational BMPs and Structural Source Control BMPs. See
Volume IV for design details of these BMPs. For construction sites, see Volume II, Chapter 3.
3.4.3.1 Objective
The intent of source control BMPs is to prevent stormwater from coming in contact with pollutants.
They are a cost-effective means of reducing pollutants in stormwater, and, therefore, should be a first
consideration in all projects.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 23
3.4.4 Minimum Requirement #4: Preservation of Natural Drainage Systems
and Outfalls
Natural drainage patterns shall be maintained, and discharges from the project site shall
occur at the natural location, to the maximum extent practicable. The manner by which runoff
is discharged from the project site must not cause a significant adverse impact to
downstream receiving waters and downgradient properties. All outfalls require energy
dissipation.
As part of a submittal, the applicant shall identify the location of natural drainage,
topography, historic drainage information and any potential impacts.
3.4.4.1 Objective
To preserve and utilize natural drainage systems to the fullest extent because of the multiple
stormwater benefits these systems provide; and to prevent erosion at and downstream of the
discharge location.
3.4.5 Minimum Requirement #5: On-Site Stormwater Management
Projects shall employ, where feasible and appropriate, On-site Stormwater Management
BMPs to infiltrate, disperse, and retain stormwater runoff onsite to the maximum extent
feasible without causing flooding, erosion, water quality or groundwater impacts. All projects
required to comply with Minimum Requirement #5 shall employ all of the following BMPs as
applicable:
• Roof Downspout Control BMPs, functionally equivalent to those described in
Volume III, Section 2.1, and
• Dispersion, functionally equivalent to those described in Volume VI, Section 2.2, and
• Soil Quality BMPs, functionally equivalent to those in Volume VI, Section 2.2.1.4.
Where roof downspout controls are planned, the following three types shall be considered in
descending order of preference:
• Downspout infiltration systems including rain gardens (Volume III, Section 2.1.2 and
Section 2.1.4, and Volume VI, Section 2.2.3).
• Downspout dispersion systems (Volume III, Section 2.1.3), only if infiltration is not
feasible.
• Collect and convey to City system (Volume III, Section 2.1.5) if other alternatives are
not feasible.
3.4.5.1 Objective
To use inexpensive practices on individual properties to reduce the amount of disruption of the
natural hydrologic characteristics of the site
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 24
3.4.6 Minimum Requirement #6: Runoff Treatment
3.4.6.1 Thresholds
The following require construction of stormwater treatment facilities:
• Projects in which the total of effective pollution-generating impervious surface
(PGIS) is 5,000 square feet or more in a threshold discharge area of the project,
or
• Projects in which the total of pollution-generating pervious surfaces (PGPS) is
three-quarters (3/4) of an acre or more in a threshold discharge area, and from
which there is a surface discharge in a natural or man-made conveyance
system from the site.
Total effective pollution-generating impervious surface shall include all new plus replaced
PGIS. That portion of any development project in which the above PGIS or PGPS thresholds
are not exceeded in a threshold discharge area shall apply On-site Stormwater Management
BMPs, where feasible, in accordance with Minimum Requirement #5.
3.4.6.2 Treatment Facility Selection, Design, and Maintenance
Stormwater treatment facilities shall be:
• Selected in accordance with the process identified in Volume V, Chapter 1;
• Designed in accordance with the design criteria in Volume V; and
• Maintained in accordance with the maintenance standards in Volume I,
Appendix D that shall be incorporated in the design as part of a facility
operation and maintenance manual.
3.4.6.3 Additional Requirements
• Direct discharge of untreated stormwater from pollution-generating surfaces
above the thresholds given in Section 3.4.6.1 to groundwater is prohibited.
• Infiltration of any amount of PGS is not allowed within the Groundwater
Protection Zone 2 unless approved in writing per Volume I, Section 2.1.
3.4.6.4 Objective
The purpose of runoff treatment is to reduce pollutant loads and concentrations in stormwater runoff
using physical, biological, and chemical removal mechanisms so that beneficial uses of receiving
waters are maintained and, where applicable, restored. When site conditions are appropriate,
infiltration can potentially be the most effective BMP for runoff treatment.
3.4.6.5 Supplemental Guidelines
The above thresholds apply to both a project’s on-site and off-site improvements. Once the project is
required to meet this minimum requirement, all new and replaced pollution generating impervious
surfaces are required to provide treatment. No net or average is permitted between non-pollution
generating surfaces and pollution generating.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 25
NOTE: With respect to Water Quality, a “net” total of pollution generating impervious surface will not
be considered when dealing with replaced impervious surfaces. Construction of new surfaces that do
not generate pollution does not balance the environmental impacts of newly created pollution
generating surfaces. All new or redeveloped pollution generating surfaces that meet the thresholds
for new and redevelopment and create, add and/or replace 5,000 square feet pollution generating
impervious surface shall provide water quality.
See Volume V for more detailed guidance on selection, design, and maintenance of treatment
facilities.
3.4.7 Minimum Requirement #7: Flow Control
3.4.7.1 Applicability
Projects must provide flow control to reduce the impacts of stormwater runoff from
impervious surfaces and land cover conversions. Portions of projects discharging to a
wetland shall also be subject to Minimum Requirement #8.
The flow control requirement thresholds apply to projects that discharge directly or
indirectly:
Through a conveyance system, into fresh water; or
Through a conveyance system into a gulch; or
To a City identified capacity problem existing downstream of the development;
or
To a manmade conveyance system (ditch, swale, etc.) which has not been
adequately stabilized to prevent erosion; or
To a conveyance system without capacity to convey the fully developed
design event as defined in Volume III, Chapter 3.
3.4.7.2 Thresholds
Projects that meet or exceed the following thresholds require construction of flow control
facilities and/or land use management BMPs.
Project sites in which the total of effective impervious surfaces is
10,000 square feet or more in a threshold discharge area, or
Projects that convert ¾ acres or more of native vegetation to lawn or
landscape, or convert 2.5 acres or more of native vegetation to pasture in a
threshold discharge area, and from which there is a surface discharge in
natural or man-made conveyance system from the site, or
Projects that, through a combination of effective impervious surfaces and
converted pervious surfaces, cause a 0.1 cfs increase in the 100-year flow
frequency from a threshold discharge area as estimated using the Western
Washington Hydrology Model or other approved model. Comparison will be
between existing and proposed site conditions.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 26
That portion of any development project in which the thresholds listed above are not
exceeded in a threshold discharge area, shall apply Onsite Stormwater Management BMPs in
accordance with Minimum Requirement #5. Refer to Figure I-3-1, Figure I-3-2 and Figure I-3-3
to aid in determining project requirements.
3.4.7.3 Standard Requirement
Using WWHM for design, stormwater discharges shall match developed discharge durations
to pre-developed durations for the range of pre-developed discharge rates from 50% of the
2-year peak flow up to the full 50-year peak flow. The pre-developed condition to be matched
shall be a forested land cover. The pre-developed soil types shall be assumed as either
outwash (Hydrologic Soil Group A/B) or till (Hydrologic Soil Group C/D) soils, depending on
supporting geotechnical information. Saturated soil conditions shall only be considered
when determining existing wetland hydrology.
This standard requirement is waived for sites that will reliably infiltrate all the runoff from
impervious surfaces and converted pervious surfaces.
Any areas for which the minimum thresholds are not exceeded must still meet the following
criteria:
The project must be drained by a conveyance system with capacity to convey
the fully developed design event as defined in Volume III, Chapter 3. The
conveyance system must consist entirely of manmade conveyance elements
(e.g., pipes, ditches, outfall protection, etc.) and extend to the ordinary high
water line of the receiving water; and
Any erodible elements of the manmade conveyance system must be
adequately stabilized to prevent erosion under future build-out conditions from
areas that contribute flow to the system; and
No City identified capacity problems may exist downstream of the
development; and
Surface water flows from the area must not be diverted from or increased to an
existing wetland, stream, or near-shore habitat sufficient to cause a significant
adverse impact.
3.4.7.4 Infrastructure Protection Requirement
The infrastructure protection requirement is intended to mitigate stormwater impacts from
projects that are not required to provide flow control, but discharge to a system with capacity
limitations such as projects with the following characteristics:
Inadequate capacity in downstream conveyance.
Applicant may resolve the downstream capacity problem or may provide on-site detention.
Where detention is provided, stormwater discharges for the developed condition shall match
the discharges under existing conditions.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 27
3.4.7.5 Objective
To prevent increases in the stream channel erosion rates that are characteristic of natural conditions
(i.e., prior to the European settlement). The standard intends to maintain the total amount of time that
a receiving stream exceeds an erosion-causing threshold based upon historic rainfall and natural
land cover conditions. That threshold is assumed to be 50% of the 2-year peak flow. Maintaining the
naturally occurring erosion rates within streams is vital, though by itself insufficient, to protect fish
habitat and production.
3.4.7.6 Modeling Requirements
To meet the Standard Requirement, the applicant shall use the most current software
version of the Department of Ecology’s Western Washington Hydrology Model
(WWHM) model (see Volume III). Alternative models for sizing flow control and water
quality facilities may be considered, provided they are Washington State Department
of Ecology equivalent, and approved by the City of Auburn. Approval from the City
shall be obtained prior to submittal of design documents.
To meet the Downstream Analysis requirements, piped conveyance systems shall be
modeled using either continuous simulation or single event methods. Stream
systems shall be modeled using only continuous simulation methods.
The designer shall provide a copy of the completed hydrology analysis worksheet (Appendix
C) and a copy of the electronic project files.
NOTE: Hand-calculated hydrographs and flow routing will no longer be accepted because of the
wide availability of various software programs.
3.4.8 Minimum Requirement #8: Wetlands Protection
Wetlands are regulated by the City of Auburn through this requirement and the Critical Areas Code,
Auburn City Code 16.10. For more information about wetlands, wetland permits and development
close to wetlands, please contact the Planning, Building & Community Department at (253) 931-
3090.
3.4.8.1 Applicability
Stormwater discharges to wetlands are regulated under the City’s Critical Areas Ordinance
(ACC 16.10).
The requirements below are in addition to requirements given in ACC 16.10 and apply only to
projects whose stormwater discharges into a wetland, either directly or indirectly through a
conveyance system. These requirements must be met in addition to meeting Minimum
Requirement #6, Runoff Treatment. All pollution generating surfaces discharging to wetlands
shall require water quality treatment prior to discharge to the wetlands. Streams may also be
regulated under this requirement as part of the wetland permit.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 28
3.4.8.2 Thresholds
When either of the thresholds identified in Minimum Requirement #6 – Runoff Treatment, or
Minimum Requirement #7 – Flow Control are met or exceeded, this requirement shall also be
applied.
3.4.8.3 Standard Requirement
Discharges to wetlands shall maintain the hydrologic conditions, hydrophytic vegetation, and
substrate characteristics necessary to support existing and designated uses. The hydrologic
analysis shall use the existing land cover condition to determine the existing hydrologic
conditions unless directed otherwise by a regulatory agency with jurisdiction. A wetland can
be considered for hydrologic modification and/or stormwater treatment in accordance with
Guidesheet 1B in Appendix E. Modeling shall be completed with a continuous simulation
model. Model calibration and pre- and post-development monitoring of wetland levels,
groundwater levels, and water quality may be required by the City.
3.4.8.4 Additional Requirements
The standard requirement does not excuse any discharge from the obligation to apply
whatever technology is necessary to comply with state water quality standards,
Chapter 173-201A WAC, or state groundwater standards, Chapter 173-200 WAC. Additional
treatment requirements to meet those standards may be required by federal, state, or local
governments.
Stormwater treatment and flow control facilities shall not be constructed within a natural
vegetated buffer, except for:
Necessary conveyance systems as approved by the City; or
As allowed in wetlands approved for hydrologic modification and/or treatment
in accordance with Guidesheet 1B in Appendix E of this Volume.
Flow splitting devices or drainage BMPs must be applied to route natural runoff
volumes from the project site to any downstream stream or wetland.
Design of flow splitting devices or drainage BMPs will be based on continuous
hydrologic modeling analysis. The design will assure that flows delivered to stream
reaches will approximate, but in no case exceed, durations ranging from 50% of the
2-year to the 50-year peak flow.
Flow splitting devices or drainage BMPs that deliver flow to wetlands shall be designed using
continuous hydrologic modeling to preserve pre-project wetland hydrologic conditions
unless specifically waived or exempted by regulatory agencies with permitting jurisdiction;
An adopted and implemented basin plan, or a Total Maximum Daily Load (TMDL, also known
as a Water Clean-up Plan) may be used to develop requirements for wetlands that are tailored
to a specific basin.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 29
3.4.8.5 Objective
To ensure that wetlands receive the same level of protection as any other waters of the state.
Wetlands are extremely important natural resources which provide multiple stormwater benefits,
including groundwater recharge, flood control, and stream channel erosion protection. They are
easily impacted by development unless careful planning and management are conducted. Wetlands
can be severely degraded by stormwater discharges from urban development due to pollutants in the
runoff and also due to disruption of natural hydrologic functioning of the wetland system. Changes in
water levels and the frequency and duration of inundations are of particular concern.
3.4.8.6 Supplemental Guidelines
Appendix E contains guidance for wetlands when interacting with stormwater. The City of Auburn
may require applicants to utilize portions or all of the guidance in analyzing and mitigating
wetland impacts.
3.4.9 Minimum Requirement #9: Operation and Maintenance
An operation and maintenance manual that is consistent with the provisions in Section 4.1 of
this Volume shall be provided for all proposed stormwater facilities and BMPs at the time
construction plans are submitted for review, and the party (or parties) responsible for
maintenance and operation shall be identified.
For private facilities, a copy of the manual shall be retained onsite or within reasonable
access to the site, and shall be transferred with the property to the new owner. For private
systems serving multiple lots within residential developments or other developments, a
separate covenant or other guarantee of proper maintenance that can be recorded on title
shall be provided and recorded. For public facilities, a copy of the manual shall be retained in
the appropriate department.
For all facilities (public and private), a log of maintenance activity that indicates what actions
were taken shall be kept and be available for inspection by the City.
3.4.9.1 Objective
To ensure that stormwater control facilities are adequately maintained and operated properly.
3.4.9.2 Supplemental Guidelines
Inadequate maintenance is a common cause of failure for stormwater control facilities. The
description of each BMP in Volumes II, III, V, and VI includes a section on maintenance. Appendix D
of Volume I includes a schedule of maintenance standards for drainage facilities.
3.4.10 Minimum Requirement #10: Off-Site Analysis and Mitigation
As required by the Minimum Requirements of this Chapter, development projects that
discharge stormwater offsite shall submit as part of their Stormwater Site Plan and Report an
off-site analysis that assesses the potential off-site impacts of stormwater discharge.
All projects shall perform a qualitative analysis downstream from the site.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 30
The City may require a quantitative analysis for any project deemed to need additional
downstream information.
3.4.10.1 Qualitative Analysis:
Project applicants shall submit a qualitative analysis of each upstream system entering a site
(run-on) and each downstream system leaving a site (run-off). The qualitative analysis shall
extend downstream for the entire flow path, from the project site to the receiving water, or up
to one-quarter mile, whichever is less. The upstream analysis shall identify and describe
points where water enters the site and the tributary area. A basin map defining the onsite and
offsite basins tributary to the site shall be provided. The basin map shall be to a defined
scale.
Upon review of this analysis, the City may require a qualitative analysis further downstream,
mitigation measures deemed adequate to address the problems, or a quantitative analysis,
depending upon the presence of existing or predicted flooding, erosion, or water quality
problems, and on the proposed design of the onsite drainage facilities. Details on how to
perform this analysis are located in Volume I, Chapter 4 and Volume I, Appendix B.
3.4.10.2 Quantitative Analysis
The City may require a quantitative analysis for any project deemed to need additional
downstream information. Details on how to perform this analysis are located in Volume III,
Section 3.1.2.
3.4.10.3 Objective
To identify and evaluate offsite water quality, erosion, slope stability, and drainage impacts that may
be caused or aggravated by a proposed project, and to determine measures for preventing impacts
and for not aggravating existing impacts. Aggravated shall mean increasing the frequency of
occurrence and/or severity of a problem. Some of the most common and potentially destructive
impacts of land development are erosion of downgradient properties, localized flooding, and slope
failures. These are caused by increased surface water volumes and changed runoff patterns. The
City believes taking the precautions of offsite analysis could prevent substantial property damage and
public safety risks. In addition the applicant will evaluate types and locations of surface run-on to the
project site. These must be safely conveyed across the project site.
3.5 Exceptions
NOTE: Throughout this Section, guidance to meet the requirements is written in BOLD.
Supplemental guidelines that serve as advice and other materials are not written in bold.
Deviations from the Minimum Requirements may be requested, in writing, in accordance with
ACC 13.48.226 to allow a waiver of a requirement, a reduction or modification of a
requirement, or to permit an alternative requirement. Public notice of application for a
deviation, draft decision, and written findings will be published in accordance with ACC
13.48.226, with an opportunity for public comment. Deviations must meet the following
criteria:
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 31
The minimum requirements would impose a severe and unexpected economic
hardship; and
The deviation will not increase risk to the public health and welfare, nor injurious to
other properties in the vicinity and/or downstream, and to the quality of waters of the
state; and
The deviation is the least possible exception that could be granted to comply with the
intent of the Minimum Requirements.
In accordance with ACC 13.48.226, the City Engineer may grant a deviation following a
documented finding that:
The deviation is likely to be equally protective of public health, safety and welfare,
the environment, and public and private property, as the requirement from
which an exception is sought.
OR
Substantial reasons exist under ACC 13.48.226 C., for approving the requested
deviation and the deviation will not cause significant harm. The substantial
reasons may include, but are not limited to:
o The requirement to be imposed is not technically feasible; or
o An emergency situation necessitates approval of the deviation; or
o No reasonable use of the property is possible unless the deviation is
approved; or
o The requirement would cause significant harm or a significant threat of
harm to public health, safety and welfare, the environment, or to public
and private property, or would cause extreme financial hardship which
substantially outweighs its benefits.
The decision to grant a deviation is within the sole discretion of the City, and the City Engineer shall
only approve a deviation to the extent it is necessary. The City Engineer may impose new or
additional requirements to offset or mitigate harm that may be caused by approving the deviation.
The City Engineer may require the applicant to submit a licensed engineer’s report or analysis along
with a request, in writing, for a deviation. Deviations are intended to maintain necessary flexible
working relationship between the City and applicants.
The approval of a deviation shall not be construed to be an approval of any violation of any of the
other provisions of the City’s Municipal Code, or of any other valid law of any governmental entity
having jurisdiction.
Applications for a deviation from the Minimum Requirements of ACC13.48.225 must be in
writing and include the following information:
The current (pre-project) use of the site, and
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Minimum Requirements for Volume I
New Development and Redevelopment Chapter 3 32
How the application of the minimum requirement(s) restricts the proposed use of the
site compared to the restrictions that existed prior to the adoption of the minimum
requirements; and
The possible remaining uses of the site if the deviation were not granted; and
The uses of the site that would have been allowed prior to the adoption of the
minimum requirements; and
A comparison of the estimated amount and percentage of value loss as a result of the
minimum requirements versus the estimated amount and percentage of value loss as
a result of requirements that existed prior to adoption of the minimum requirements;
and
The feasibility for the owner to alter the project to apply the minimum requirements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 33
Chapter 4 Preparation of Stormwater Site Plans
The Stormwater Site Plan is the comprehensive report containing all of the technical information and
analysis necessary for the City to evaluate a proposed new development or redevelopment project
for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the
type and size of the project, and individual site characteristics. The scope of the Stormwater Site Plan
also varies depending on the applicability of Minimum Requirements (see Section 3.4). However,
typical Stormwater Site Plans will contain both a report and detailed plans.
This chapter describes the contents of a Stormwater Site Plan and provides a general procedure for
how to prepare the plan. The goal of this chapter is to provide a framework for uniformity in plan
preparation. Such uniformity will promote predictability and help secure prompt review. Properly
drafted engineering plans and supporting documents will also facilitate the operation and
maintenance of the proposed system long after construction is complete.
To aid the design engineer, a checklist containing submittal requirements is located in Appendix B
and a hydraulic analysis worksheet is provided in Appendix C. These appendices should be
completed and provided by the design engineer. These documents will be utilized by the City during
the project review.
Stormwater Site Plans shall be prepared by a licensed Professional Engineer. All Stormwater Site
Plans and drawings shall be signed, stamped, and dated prior to review by the City.
4.1 Stormwater Site Plan Outline
The Stormwater Site Plan (SSP) encompasses the entire submittal to the City for drainage review.
This section provides an outline for a SSP and details drawing requirements.
Chapter 1 - Project Overview
The project overview must provide a general description of the project, pre-developed and developed
conditions of the site, site area, and size of the improvements, and the pre- and post-developed
stormwater runoff conditions. The overview shall summarize difficult site parameters, the natural
drainage system, and drainage to and from adjacent properties, including bypass flows.
The vicinity map shall clearly locate the property, identify all roads bordering the site, show the route
of stormwater off-site to the local natural receiving water, and show significant geographic features
and sensitive/critical areas (streams, wetlands, lakes, steep slopes, etc.).
Include a list of other necessary permits and approvals as required by other regulatory agencies, if
those permits or approvals include conditions that affect the drainage plan, or contain more restrictive
drainage-related requirements.
Chapter 2 – Existing Conditions Summary
Collect and review information on the existing site conditions, including topography, drainage
patterns, soils, ground cover, presence of any critical areas, adjacent areas, existing development,
existing stormwater facilities, and adjacent on- and off-site utilities. Analyze data to determine site
limitations including:
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 34
• Areas with high potential for erosion and sediment deposition (based on soil
properties, slope, etc.); and
• Locations of sensitive and critical areas (e.g. vegetative buffers, wetlands, steep
slopes, floodplains, geologic hazard areas, streams, etc.).
• Points where existing surface water enters and exits the project site.
Delineate these areas on the vicinity map and/or a site map. Prepare an Existing Conditions
Summary that will be submitted as part of the Site Plan. Part of the information collected in this step
should be used to help prepare the Construction Stormwater Pollution Prevention Plan.
Chapter 3 – Off-Site Analysis – Minimum Requirement # 10
The existing or potential impacts to be evaluated and mitigated as part of any off-site/downstream
analysis shall include:
• Conveyance system capacity problems;
• Localized flooding;
• Aquatic habitat (wetlands) impacts;
• FEMA flood plain;
• Upland erosion impacts, including landslide hazards;
• Stream channel erosion at the outfall location;
• Impacts to surface water, groundwater, or sediment quality as identified in a Basin
Plan or TMDL (Water Clean-up Plan);
• Locations where surface water enters and exits the site.
Qualitative Analysis:
Project applicants shall submit a qualitative analysis of each upstream system entering a site (run-on)
and each downstream system leaving a site (run-off). The qualitative analysis shall extend
downstream for the entire flow path, from the project site to the receiving water, or up to one-quarter
mile, whichever is less. The upstream analysis shall identify and describe points where water enters
the site and the tributary area. A basin map defining the onsite and offsite basins tributary to the site
shall be provided. The basin map shall be to a defined scale.
Upon review of this analysis, the City may require a qualitative analysis further downstream,
mitigation measures deemed adequate to address the problems, or a quantitative analysis,
depending upon the presence of existing or predicted flooding, erosion, or water quality problems,
and on the proposed design of the onsite drainage facilities. Details on how to perform this analysis
are located in Volume I, Appendix B.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 35
Quantitative Analysis:
The City may require a quantitative analysis for any project deemed to need additional downstream
information. Details on how to perform this analysis are located in Volume III, Section 3.1.2.
The off-site analysis shall extend downstream of the site for a minimum of ¼ mile from the point of
connection to the existing public drainage system, or until a trunk main is reached.
Chapter 4 – Permanent Stormwater Control Plan
The Permanent Stormwater Control Plan consists of those stormwater control BMPs and facilities
that will serve the project site in its developed condition.
A preliminary design of the BMPs and facilities is necessary to determine how they will fit within and
serve the entire preliminary development layout. After a preliminary design is developed, the designer
may want to reconsider the site layout to reduce the need for construction of facilities, or the size of
the facilities by reducing the amount of impervious surfaces created and increasing the areas to be
left undisturbed. After the designer is satisfied with the BMP and facilities selections, the information
must be presented within a Permanent Stormwater Control Plan.
Where modeling is completed, the City may require the model files be provided electronically.
The Permanent Stormwater Control Plan should contain the following sections:
1. Threshold Discharge Areas and Applicable Requirements for Treatment, Flow Control
and Wetlands Protection
Complete the following tasks:
A. Read the definitions in the Glossary located at the back of this manual for the
following terms: effective impervious surface, impervious surface, pollution-
generating impervious surface (PGIS), pollution-generating pervious surface
(PGPS), threshold discharge area, project site, and replaced impervious surfaces.
B. Outline the threshold discharge areas for your project site.
C. Determine the amount of effective pollution-generating impervious surfaces and
pollution –generating pervious surfaces in each threshold discharge area. Compare
those totals to the categories in Section 3.4.6 to determine where treatment facilities
are necessary. Note that On-site Stormwater Management BMPs are always
applicable.
D. Determine the amount of effective impervious surfaces and converted pervious
surfaces in each threshold discharge area. Using an approved continuous runoff
simulation model, estimate the increase in the 100-year flow frequency within each
threshold discharge area.
E. Compare those totals to the categories in Section 3.4.7 to determine where flow
control facilities are necessary. Note that On-site Stormwater Management BMPs
may alter the calculation of effective impervious surface. See Volume VI for WWHM
flow credit information.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 36
2. Pre-developed Site Hydrology
The acreage, soil types, and land covers used to determine the pre-developed flow characteristics,
along with basin maps, graphics, and exhibits for each sub-basin affected by the project should be
included.
Provide a topographic map, of sufficient scale and contour intervals to determine basin boundaries
accurately, and show:
• Delineation and acreage of areas contributing runoff to the site;
• Flow control facility location;
• Outfall;
• Overflow route; and
• All natural streams and drainage features.
The direction of flow, acreage of areas contributing drainage, and the limits of development should be
indicated. Each basin within or flowing through the site should be named and model input parameters
referenced, as appropriate.
If stormwater facilities that require sizing are proposed, provide a listing of assumptions and site
parameters used in analyzing the pre-developed site hydrology.
For projects requiring flow control, the pre-developed condition to be matched shall be a forested
land cover unless reasonable, historic information is provided that indicates the site was prairie prior
to settlement.
3. Developed Site Hydrology
All Projects:
Total of impervious surfaces, total pollution-generating impervious surfaces, total pollution-generating
pervious surfaces, and total disturbed area must be tabulated for each threshold discharge area.
These are needed to verify which minimum requirements apply to a project.
Projects and Threshold Discharge Areas within Projects That Require Treatment and Flow Control
Facilities:
Provide narrative, mathematical, and graphic presentations of model input parameters selected for
the developed site condition, including acreage, soil types, and land covers, road layout, and all
drainage facilities. The applicant shall reference sources for all variables and equations. All
submissions shall be in typed format with a table of contents and labels for all figures and
calculations. If calculations are used from other sections of the submittal, they shall be referenced
with the appropriate, section and page number to the point of their original derivation.
Previous stormwater reports may be referenced. The City may request submission of all reference
reports in their entirety.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 37
Developed basin areas and flows shall be shown on a map and cross-referenced to computer
printouts or calculation sheets. Developed basin flows should be listed and tabulated.
Any documents used to determine the developed site hydrology should be included. Maintain the
same basin name as used for the pre-developed site hydrology. If the boundaries of a basin have
been modified by the project, that should be clearly shown on a map and the name modified to
indicate the change.
Final grade topographic maps shall be provided including finished floor elevations, where
appropriate.
4. Performance Standards and Goals
If treatment facilities are proposed, provide a listing of the water quality menus used (Chapter 2 of
Volume V). If flow control facilities are proposed, provide a confirmation of the flow control standard
being achieved (e.g., the Ecology flow duration standard).
5. Flow Control System
Provide a drawing of the flow control facility and its appurtenances. This drawing must show basic
measurements necessary to calculate the storage volumes available from zero to the maximum
head, all orifice/restrictor sizes and head relationships, control structure/restrictor placement, and
placement on the site.
Include computer printouts, calculations, equations, references, storage/volume tables, graphs as
necessary to show results and methodology used to determine the storage facility volumes. Where
the Western Washington Hydrology Model is used, its documentation files shall be submitted
electronically.
6. Water Quality System
Provide a drawing of the proposed treatment facilities, and any structural source control BMPs. The
drawing must show overall measurements and dimensions, placement on the site, location of inflow,
bypass, and discharge systems.
Include computer printouts, calculations, equations, references, and graphs as necessary to show
the facilities are designed in accordance with the requirements and design criteria in Volume V.
If using a manufactured system provide a specification from the manufacturer as well as all design
specific parameters.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 38
7. Conveyance System Analysis and Design
Present an analysis of any existing conveyance systems, and the analysis and design of the
proposed stormwater conveyance system for the project. Portions of this analysis may include the
criteria established in Item 3 above. This information should be presented in a clear, concise manner
that can be easily followed, checked, and verified. All pipes, culverts, catch basins, channels, swales,
and other stormwater conveyance appurtenances must be clearly labeled and correspond directly to
the engineering plans. The analysis should be based on the design elements within the City of
Auburn Engineering Design and Construction Standards and Volume III, Chapter 3 of this manual.
Chapter 5 – Discussion of Minimum Requirements
Provide a list of the minimum requirements that apply to the project site. Indicate where in the
Stormwater Site Plan the documentation showing how the minimum requirements are satisfied can
be found.
Appendix A – Operation and Maintenance (O & M) Manual
The O&M manual shall be designed as a stand-alone document, including all necessary figures and
maps. The document may be submitted as either an Appendix to the SSP or bound separately.
Submit an operations and maintenance manual for each permanent stormwater facility. The manual
shall contain a description of the facility, what it does, and how it works. The manual must identify and
describe the maintenance tasks, and the required frequency of each task. The maintenance tasks
and frequencies must meet the standards established in this manual.
Include a recommended format for a maintenance activity log. The log will have space to list
maintenance activities.
The manual must prominently indicate where it shall be kept, and that it must be made available for
inspection by the City. Specifically the manual will include:
Statements:
• Where the O&M manual shall be kept.
• That the O&M manual must be made available for inspection by the City.
• Name of the person or organization responsible for maintenance of the on-site storm
system, including the phone number of the current responsible party.
Descriptions of:
• Each flow control and treatment facility, what it does, how it works, and maintenance
tasks and frequency
• Operation and Maintenance Guidelines from the manufacturer of any proprietary flow
control and treatment facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 39
Sample forms:
• A summary sheet of the required inspection and maintenance frequencies for each
specific facility (catch basins, ponds, vaults)
• A recommended format for a maintenance activity log that will indicate what
maintenance actions have been taken for each flow control and treatment facility
• Relevant maintenance checklists from Appendix D of Volume 1 of the SWMM.
Figures and/or maps:
• An 11” x 17” map of the site, with the locations of the flow control and treatment
facilities prominently noted.
Appendix B – Construction Stormwater Pollution Prevention Plan
This is the plan described in Section 3.4.2 and Volume II.
Appendix C – Submittal Requirements Checklist
A copy of the checklist can be found in Volume I, Appendix B and shall be completed by the
engineer.
Appendix D – Hydraulic Analysis Worksheet
A copy of the worksheet can be found in Volume I, Appendix C and shall be completed by the
engineer.
Appendix E – Other Special Reports
In this Appendix, include any special reports and studies conducted to prepare the Stormwater Site
Plan (e.g. soil testing, wetlands delineation).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Preparation of Stormwater Site Plans Volume I
Chapter 4 40
4.2 Plans Required After Stormwater Site Plan Approval
Follow the plan approval process given in the Chapters 2 and 3 of the City of Auburn Engineering
Design Standards Manual.
4.3 Land Use Submittal Requirements
A reference to the subdivision checklists will be inserted here.
SURFACE W ATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulatory Requirements Volume I
Appendix A 41
Appendix A Regulatory Requirements
This appendix contains the regulatory requirements that apply to applicable sites and their
stormwater discharges.
Relationship of this Manual to Federal, State, and Local Regulatory Requirements
This manual is modeled after Ecology’s 2005 Stormwater Management Manual for Western
Washington. Ecology considers its manual to include all known, available, and reasonable methods
of prevention, control, and treatment (AKART; RCW 90.48.010). Within Auburn, Ecology’s manual
has no independent regulatory authority except where Ecology directly requires or issues permits.
The City of Auburn currently is regulated under a General Permit for Discharges from Municipal
Separate Storm Sewers, effective February 16, 2007. Under federal regulations, Auburn is required
to obtain coverage under this permit, and the permit is expected to require the adoption of stormwater
program components that are the substantial equivalent to the minimum requirements found in
Ecology’s 2005 stormwater manual for western Washington. Upon adoption, Auburn will use this
manual in issuing permits and other authorizations for development.
The Puget Sound Water Quality Management Plan
The current Puget Sound Water Quality Management Plan (the Plan), adopted in 2000 by the Puget
Sound Action Team (PSAT), is a voluntary plan that calls for every city and county in the Puget
Sound Basin to develop and implement a comprehensive stormwater management program. The
Plan recognizes that stormwater programs will vary among jurisdictions, depending on the
jurisdiction’s population, density, threats posed by stormwater, and results of watershed planning
efforts. Under the Plan, cities and counties are encouraged to form intergovernmental cooperative
agreements in order to pool resources and carry out program activities more efficiently. More
information about what the Plan contains can be found in Chapter 1 of Ecology’s Manual, and a
complete copy of the Plan can be downloaded from the PSAT website.
Phase II - Ecology’s NPDES and State Waste Discharge Stormwater Permits for
Municipalities
Auburn is subject to permitting under the U.S. Environmental Protection Agency (EPA) Phase II
Stormwater Regulations (40 CFR Part 122) under the Clean Water Act National Pollutant Discharge
Elimination System (NPDES) provisions. In Washington State, administration of the NPDES program
is delegated to the Department of Ecology. In Western Washington, Ecology has issued joint NPDES
and State Waste Discharge permits to regulate the discharges of stormwater from the municipal
separate storm sewer systems operated by small municipal permittees.
Requirements arising out of Auburn’s municipal stormwater permit are incorporated into this manual.
Ecology’s State Waste Discharge Permits for Direct Discharges
The requirements imposed under the Phase II EPA Stormwater Regulations apply to discharges to
Auburn’s municipal stormwater system. However, the regulations do not apply to “direct discharges,”
that is, discharges that do not enter the City’s system but go directly into receiving waters such as
creeks or rivers.
SURFACE W ATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulatory Requirements Volume I
Appendix A 42
Direct discharges are subject to permitting under Ecology’s State Waste Discharge Permit program
in Chapter 90.48 RCW.
Ecology’s Industrial Stormwater Permit (i.e. NPDES and State Waste Discharge
Baseline General Permit for Stormwater Discharges Associated With Industrial
Activities)
This is a statewide permit for facilities conducting industrial activities. Most industrial facilities that
discharge stormwater to a surface water body or to a municipal storm sewer system require permit
coverage. Existing and new facilities for private entities, state, and local governments are required to
have coverage. For a complete list of industrial categories identified for coverage, see Ecology’s
website or the permit itself. Ecology can also require permit coverage of any facility on a case-by-
case basis in order to protect waters of the state. As above, direct discharges from industrial activities
are subject to permitting under Ecology’s State Waste Discharge Permit program in Chapter 90.48
RCW.
Ecology’s Construction Stormwater Permit (i.e. NPDES and State Waste Discharge
General Permit for Stormwater Discharges Associated With Construction Activity)
Coverage under Ecology’s Construction General Permit is required for any clearing, grading, or
excavating that will disturb one or more acres of land area and that will discharge stormwater from
the site into surface water(s), or into storm drainage systems that discharge to a surface water. The
permit requires:
• Application of stabilization and structural practices to reduce the potential for erosion
and the discharge of sediments from the site. The stabilization and structural
practices cited in the permit are similar to the minimum requirements for
sedimentation and erosion control in Volume II of this manual.
• Construction sites within the Puget Sound basin to select from BMPs described in
Volume 2 of the most recent edition of Ecology’s Stormwater Management Manual
(SWMM) that has been available at least 120 days prior to the BMP selection.
If local government requirements for construction sites are at least as stringent as Ecology’s, Ecology
will accept compliance with the local requirements. Accordingly, projects subject to Auburn’s
permitting authority that are also required to obtain coverage under Ecology’s NPDES Construction
Permit should be designed in accordance with Auburn’s manual.
The permit is also required for projects or construction activities that disturb less than one acre of land
area, if the project or activity is part of a larger common plan of development or sale that will
ultimately disturb one or more acres of land area. The "common plan" in a common plan of
development or sale is broadly defined as any announcement or piece of documentation (including a
sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request,
computer design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor
markings, etc.) indicating construction activities may occur on a specific plot.
The permit is not required for routine maintenance that is performed to maintain the original line and
grade, hydraulic capacity, or original purpose of the site. For example, re-grading a dirt road or
cleaning out a roadside drainage ditch to maintain its "as built" state does not require permit
coverage.
SURFACE W ATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulatory Requirements Volume I
Appendix A 43
Any construction activity discharging stormwater that Ecology and/or the City determine to be a
“significant contributor of pollutants” to waters of the state may also be required to apply for and
obtain permit coverage regardless of project size.
Applicants for coverage under the Construction General Permit must do the following:
• File a Notice of Intent (application for coverage). The permit application, called a
Notice of Intent (NOI), shall be submitted to Ecology before the date of the first public
notice and at least 38 days prior to the start of construction.
• Publish a Public Notice. At the time of application, the applicant must publish a notice
that they are seeking coverage under Ecology’s general stormwater permit for
construction activities. This notice must be published at least once each week for two
consecutive weeks in a single newspaper that has general circulation in the county in
which the construction is to take place. Refer to the NOI instructions for public notice
language requirements. State law requires a 30-day public comment period prior to
permit coverage; therefore, permit coverage will not be granted sooner than 31 days
after the date of the last public notice. Applicants who discharge surface water
associated with construction activity to a storm drain operated by the City of Auburn
are also required to submit a copy of the NOI to the municipality.
• Prepare a Construction Stormwater Pollution Prevention Plan. Permit coverage will
not be granted until the permittee has indicated completion of the SWPPP or certified
that development of a SWPPP in accordance with Special Condition S9 of the permit
will occur prior to the commencement of construction. The construction SWPPP
prepared using the City’s manual will satisfy both the Ecology permit and City of
Auburn permits.
Endangered Species Act
With the listing of multiple species of salmon as threatened or endangered across much of
Washington state, and the probability of more listings in the future, implementation of the
requirements of the Endangered Species Act will have a dramatic effect on urban stormwater
management. The manner in which that will occur is still evolving. Provisions of the Endangered
Species Act that may apply directly to stormwater management include the Section 4(d) rules,
Section 7 consultations, and Section 10 Habitat Conservation Plans (50 CFR).
Section 401 Water Quality Certifications
For projects that require a fill or dredge permit under Section 404 of the Clean Water Act, Ecology
must certify to the permitting agency, the U.S. Army Corps of Engineers, that the proposed project
will not violate state water quality standards. In order to make such a determination, Ecology may do
a more specific review of the potential impacts of a stormwater discharge from the construction
phase of the project and from the completed project. As a result of that review, Ecology may
condition its certification to require:
• Application of the minimum requirements and BMPs in Ecology’s manual; or
• Application of more stringent requirements.
SURFACE W ATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulatory Requirements Volume I
Appendix A 44
Hydraulic Project Approvals (HPAs)
Under Chapter 77.55 RCW, the Hydraulics Act, the Washington State Department of Fish and
Wildlife has the authority to require actions when stormwater discharges related to a project would
change the natural flow or bed of state waters. The implementing mechanism is the issuance of a
Hydraulic Project Approval (HPA) permit.
Aquatic Lands Use Authorizations
The Washington State Department of Natural Resources (DNR), as the steward of public aquatic
lands, may require a stormwater outfall to have a valid use authorization, and to avoid or mitigate
resource impacts under authority of Chapter 79.90 through 96 RCW, and in accordance with Chapter
332-30 WAC.
Requirements Identified through Watershed/Basin Planning or Total Maximum Daily
Loads
A number of the requirements of this manual can be superseded or modified by the adoption of
ordinances and rules to implement the recommendations of watershed plans or basin plans.
Requirements in this manual can also be superseded or added to through the adoption of specific
actions and requirements identified in a Waste Load Allocation or cleanup plan that implements a
Total Maximum Daily Load (TMDL) approved by the EPA.
Underground Injection Control Authorizations
Congress passed the Safe Drinking Water Act in 1974 and required the Environmental Protection
Agency (EPA) to create the Underground Injection Control (UIC) Program as on of the key programs
for protecting drinking water sources. The UIC program is administered under 40 CFR Part 144. In
1984, Ecology received the authority from EPA to regulate UIC wells and adopted the UIC rule,
Chapter 173-218 WAC. Ecology adopted revisions to Chapter 173-218 WAC rules on January 3,
2006 and the new rule went into affect on February 3, 2006.
The program requires:
• A non-endangerment performance standard be met, prohibiting injection that allows
the movement of fluids containing any contaminant into groundwater.
• All well owners must provide inventory information by registering their wells with
Ecology.
More information on the UIC program and how to register your well is available at:
http://www.ecy.wa.gov/programs/wq/grndwtr/uic/index.html.
It is the responsibility of applicants/owners to contact Ecology and determine if their facilities are
regulated under this program. If regulated, the applicant/owner is responsible to fulfill the program
requirements properly.
SURFACE W ATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulatory Requirements Volume I
Appendix A 45
Other City Requirements
The Planning, Building and Community Development Department is responsible for all land use
permitting activities, including permits for buildings, grading, paving, shoreline activities, critical areas,
short plats, formal subdivisions, etc.
Title 13 of the Auburn City Code (ACC) governs wastewater and surface water and gives the City its
authority to regulate water quality control of surface waters, the stormwater system, and the sanitary
sewer system. This Title also provides inspection authority, and enforcement authority for illegal
discharges to the stormwater system.
New development and redevelopment projects also may be subject to other city code requirements,
depending upon the nature and location of the project. These code requirements may include, but
are not limited to the subdivision and land use permit procedures in Titles 17 and 14 ACC; excavation
and grading in ACC Chapter 15.74; off-site improvements that include storm drainage in ACC
13.48.330; driveway control in Chapter 12.20 ACC; groundwater protection in Chapter 8.08 ACC;
shoreline regulation in Chapter 16.08 ACC; and critical areas protection in Chapter 16.10 ACC.
The City of Auburn’s Permit Center assists customers through every aspect of the permitting
process, from initial questions and pre-application meetings through inspections and final
certificate of occupancy. Applicants are encouraged to meet with City staff prior to plan
submittal. Contact the City’s Permit Counter at 253-591-5030 for more information.
Under the Growth Management Act, Chapter 36.70A RCW, the City has developed utilities and
capital facilities plans to help ensure the provision of adequate utilities, including storm drainage.
Depending upon the type of projects, new development and redevelopment may be required to
contribute to the construction of facilities necessary to accommodate impacts created by that
development.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 46
Appendix B Stormwater Site Plan Submittal
Requirements Checklist
The Submittal Requirements Checklist is intended to aid the design engineer in preparing a
Stormwater Site Plan. All items included in the following checklist must be addressed as part of any
stormwater site plan. The City recommends the design engineer follow the order and structure of the
checklist to facilitate review, which in turn will expedite permit issuance.
Chapter 1 – Project Overview
The project overview is intended to be a summary of detailed information contained in the body of the
Stormwater Site Plan.
Identify type of permit requested and permit number
Identify other permits required (e.g. hydraulic permits, Army Corps 404 permits, wetlands, etc.).
Identify the project location (including address, legal description, and parcel number).
Brief description of project to include the following:
Current and proposed condition/land-use
Size of parcel
Acreage developed, redeveloped, replaced or converted by the project
Current assessed value and cost of proposed improvements (for redevelopment projects)
Watershed
Proposed flow control improvements
Proposed runoff treatment improvements
Proposed conveyance improvements
Proposed discharge location and improvements
Downstream condition, impacts and problem
Locations of surface water run-on to the property
Reference appropriate Sections/Chapters/Appendices of the document for detailed
descriptions.
Chapter 2 – Existing Condition Summary
The Existing Condition Summary is intended to provide a complete understanding of the project site
and must be based on thorough site research and investigation.
Describe, discuss and identify the following for the project site:
Topography
Land use and ground cover
Natural and man-made drainage patterns
Points of entry and exit for existing drainage to and from the site
Any known historical drainage problems such as flooding, erosion, etc.
Existing utilities (storm, water, sewer)
Areas with high potential for erosion and sediment deposition
Locations of sensitive and critical areas (i.e. vegetative buffers, wetlands, steep slopes,
floodplains, geologic hazard areas, streams, creeks, ponds, ravines, springs, etc).
Existing fuel tanks
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 47
Groundwater wells on-site and within 100 feet of site
Septic systems on-site and/or within 100 feet of the site
Identify difficult site conditions.
State whether the project is located in an aquifer recharge area or wellhead protection area as
defined by the Washington State Health Department, the Environmental Protection Agency or
by the City.
Identify any Superfund areas in the vicinity, and state whether they are tributary to, or receive
drainage from, the project site.
Identify any specific requirements included in a basin plan for the area.
Include references to relevant reports such as basin plans, flood studies, groundwater studies,
wetland designations, sensitive area designations, environmental impact statements,
environmental checklists, lake restoration plans, water quality reports, etc. Where such reports
impose additional conditions on the Proponent, state these conditions, and describe any
proposed mitigation measures.
Grading Plan per requirements.
A soil report to identify the following:
Soil types
Hydrologic soil group classification
Groundwater elevation
Presence of perched aquifers, acquitters and confined aquifers
Location of test pits
Infiltration rates determined per the requirements of Volume III (where applicable)
Discussion of critical areas or geologic hazards where present
Soil reports should be contained in an Appendix of the report or as a separate document.
Describe the 100-year flood hazard zone.
Chapter 3 – Off-Site Analysis (Minimum Requirement #10)
The City requires a qualitative discussion of the off-site upstream and downstream system for all
projects. The City may require a quantitative analysis for any project deemed to need additional
downstream information. Detailed calculations shall be contained in an Appendix of the report.
Volume I, Chapter 4 describes the Off-site Analysis. In addition, a list of elements to be included is
provided as follows.
Qualitative Analysis
Review all available plans, studies, maps pertaining to the off-site study area.
Investigate the drainage system ¼ mile downstream from the project by site visit, including the
following items:
Problems reported or observed during the resource review
Existing/potential constrictions or capacity deficiencies in the drainage system
Existing/potential flooding problems
Existing/potential overtopping, scouring, bank sloughing, or sedimentation
Significant destruction of aquatic habitat (e.g., siltation, stream incision)
Existing public and private easements through the project site and their corresponding
widths
Qualitative data on features such as land use, impervious surface, topography, soils,
presence of streams, and wetlands
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 48
Information on pipe sizes, channel characteristics and drainage structures
Verification of tributary drainage areas
Date and weather at the time of the inspection
Describe the drainage system and its existing and predicted problems through observations,
reports, and hydraulic modeling (as necessary) of the City-specified design storm event
described in Chapter 3 of Volume III. Describe all existing or potential problems as listed above
(e.g. pooling water or erosion). The following information shall be provided for each existing or
potential problem:
Magnitude of or damage caused by the problem
General frequency and duration
Return frequency of storm or flow when the problem occurs (may require quantitative
analysis)
Water elevation when the problem occurs
Names and concerns of the parties involved
Current mitigation of the problem
Possible cause of the problem
Whether the project is likely to aggravate the problem or create a new one
Properly include off-site areas in drainage calculations.
Quantitative Analysis (see Volume III, Section 3.1.2)
Clearly describe tail water assumptions.
Summarize results in text.
Include calculations in Appendix B of the report.
Discuss potential fixes for capacity problems.
Provide profiles where appropriate.
Chapter 4 – Permanent Stormwater Control Plan
Chapter 4 will contain the information used to select, size and locate permanent stormwater control
BMPs for the project site.
Pre-Developed Site Hydrology
Provide a list of assumptions and site parameters for the pre-developed condition.
Identify all sub-basins within, or flowing through, the site. Use consistent labeling for all sub-
basins throughout figures, calculations, and text.
For each sub-basin, identify current land use, acreage, hydrologic soil group and land use to be
modeled under pre-developed conditions. The format used in Example Table I-B-1 show below
is recommended.
Provide justification for land uses other than forest.
The pre-developed soil types shall be assumed as either outwash (Hydrologic Soil Group A/B)
or till (Hydrologic Soil Group C/D) soils, depending on supporting geotechnical information.
Saturated soil conditions shall only be considered when determining existing wetland hydrology.
Summarize output data from the pre-developed condition. Example Tables I-B-2a or I-B-2b are
recommended formats.
Include completed Hydraulic Analysis worksheet (see Appendix C in this volume) and
hydrologic calculations in Appendix D of the report.
For WWHM models, provide model files electronically.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 49
Example Table I-B-1
Sub-
Basin ID
Land Use and
Cover Condition
Acreage Soil
Group
Modeled as:
(List CN)
Comments
Example Table I-B-2a
Pre-Developed Condition Event Output: SBUH
Basin ID:
Peak Flow (cfs) Volume (ac-ft) Area (ac)
2-year existing
10-year existing
25-year existing
100-year existing
Example Table I-B-2b
Pre-Developed Condition Event Output: WWHM
Basin ID:
Peak Flow (cfs) Area (ac)
2-year existing
10-year existing
25-year existing
100-year existing
Developed Site Hydrology
Provide a list of assumptions and site parameters for the developed condition.
Identify all sub-basins within, or flowing through, the site. Use consistent labeling for all sub-
basins throughout figures, calculations, and text.
For each sub-basin, identify current land use, acreage, hydrologic soil group and land use to be
modeled under developed conditions. The format used in Example Table I-B-1 is
recommended.
Summarize output data from the developed condition. The formats used in Example
Tables I-B-2a or I-B-2b are recommended.
Include completed Hydraulic Analysis worksheet (see Appendix C in this volume) and
hydrologic calculations in Appendix D of the report.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 50
Performance Goals and Standards
Indicate total acreage of impervious surfaces, pollution-generating impervious surfaces and
pollution-generating pervious surfaces for each Threshold Discharge Area (TDA). The format
used in Example Table I-B-3 is recommended.
Include applicable decision chart (Figure I-3-1, Figure I-3-2, or Figure I-3-3) with treatment
requirements clearly marked and supported.
Include applicable decision chart (Figure I-3-2) with flow control requirements clearly marked
and supported. If flow control facilities are required, indicate that they are required.
State conclusions from decision and flow charts.
Example Table I-B-3
Threshold Discharge Area ID:
Total pollution generating pervious surface (PGPS) acres
Total pollution generating impervious surface ((PGIS) acres
Native vegetation converted to lawn/landscape acres
Total effective impervious surface acres
Increase in 100-yer storm peak cfs
Flow Control System (where required)
Identify sizing system used.
Summarize model results.
Describe proposed flow control system and appurtenances, including size, type, and
characteristics of storage facility and control structure.
Provide a drawing of the flow control facility and its appurtenances, including:
Include Hydraulic Analysis Worksheet, calculations, and computer printouts (including stage
storage tables) for the flow control system to be included in Appendix D of the report.
Water Quality System (where required)
Identify the sizing method used.
Summarize model results.
Identify treatment methods used, including size, type, and characteristics of treatment facility
and appurtenances.
Provide a drawing of the treatment facility and its appurtenances, including:
Dimensions
Inlet/outlet sizes and elevations
Location of the facility on the project site
Appurtenances/fittings
Calculations for the water quality design storm and facility sizing calculations must be included in
an Appendix of the report.
Where appropriate, include manufacturer’s specifications in an Appendix of the report.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 51
Conveyance System Analysis and Design
Illustrate the proposed conveyance system on a project site plan.
Identify pipe sizes, types, and slopes.
Describe capacities, design flows, and velocities for each reach.
Include conveyance calculations in an Appendix of the report.
Chapter 5 – Discussion of Minimum Requirements
Chapter 5 is intended as a checklist for the applicant and reviewer to verify that the applicable
Minimum Requirements have been met within the project submittal.
Include applicable flowcharts for determining minimum requirements (Figure I-3-1, Figure I-3-2,
or Figure I-3-3) with decision path clearly marked.
List the minimum requirements that apply to the project.
Discuss how the project satisfies each minimum requirement.
Indicate where in the project documentation each minimum requirement is satisfied.
Chapter 6 – Operation and Maintenance Manual
The Operation and Maintenance Manual may be included in the Stormwater Site Plan, however it
shall be written with the intention of becoming a stand-alone document for the project owner once the
project is complete. The Operation and Maintenance Manual must include:
A narrative description of the on-site storm system.
An 11 x 17 inch map of the site, with the locations of the treatment/detention/infiltration/etc.
facilities prominently noted. This is needed to enable the Operation and Maintenance manual to
be a stand-alone document.
The person or organization responsible for maintenance of the on-site storm system, including
the phone number and current responsible party.
Where the Operation and Maintenance manual is to be kept. Note that it must be made
available to the City for inspection.
A description of each flow control and treatment facility, including what it does and how it works.
Include any manufacturer’s documentation.
A description of all maintenance tasks and the frequency of each task for each flow control and
treatment facility. Include any manufacturer’s recommendations.
A sample maintenance activity log indicating emergency and routine actions to be taken.
Chapter 7 – Construction Stormwater Pollution Prevention Plan
Short-Form – Please refer to Volume II, Appendix C for a complete checklist, or
Formal/Long-Form – Please refer to Volume II, Chapter 2 for a complete checklist.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Submittal Requirements Checklist Volume I
Appendix B 52
Appendices
Appendix A – Operations and Maintenance Manual
Appendix B – Construction Stormwater Pollution Prevention Plan
Appendix C – Submittal Requirements Checklist
Appendix D – Hydraulic Analysis Worksheet
Appendix E – Other reports, as required
Required Drawings
Project drawings shall be provided as required in Chapter 4, and shall include the following:
Vicinity Map
Site Map and Grading Plan
Basin Map
Storm Plan and Profile
Erosion Control Plan
Detail Sheets
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Hydraulic Analysis Volume I
Worksheet Appendix C 53
Appendix C Hydraulic Analysis Worksheet
Provide the following information for all projects, as applicable.
Name/Project: ___________________
Address
Parcel Number __________ __ Permit Number: ______ ______
Watershed: ____________
WWHM or Continuous Models Input
Model files must be provided electronically. Include both on-site and off-site quantities.
Amount of new impervious (square feet):
Amount of replaced impervious (square feet):
Amount of new plus replaced (square feet):
Amount of land disturbed (square feet):
Native vegetation to lawn/landscaped (acres):
Native vegetation to pasture (acres):
Value of proposed improvements ($):
Assessed value of existing site improvements ($):
Amount to be graded/filled (cubic feet):
Existing impervious:
Amount of new pgis (square feet):
Amount of existing pgis (square feet):
Amount of new pgs (square feet):
Amount of existing pgs (square feet):
SBUH Input
Rainfall Type:
Hydraulic Method:
Hydraulic Interval:
Peak Factor:
Tp Factor:
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Hydraulic Analysis Volume I
Worksheet Appendix C 54
Complete the following tables for sub-basins tributary to the project site (on-site and off-site).
Pre-Developed Conditions
Sub-basin Name Acreage Land Use/
Ground Cover*
Hydrologic Soil
Group*
Curve Number
* Where more than one land use or soil group are present within a sub-basin, a line item must be
shown for each to support calculation of the composite pervious and impervious Curve Numbers.
Developed Conditions
Sub-basin Name Acreage Land Use/
Ground Cover*
Hydrologic Soil
Group*
Curve Number
* Where more than one land use or soil group are present within a sub-basin, a line item must be
shown for each to support calculation of the composite pervious and impervious Curve Numbers.
Provide pervious and impervious Tc data for each sub-basin including the flow path shown on an
attached figure.
Flow Control Facilities
For the flow control facility, provide the following:
• Bottom length:
• Bottom width:
• Side slopes:
• Stage/ Storage Table with units:
For the control structure, provide the following:
• Outlet pipe size:
• Orifice elevation: Diameter:
• Orifice elevation: Diameter:
• Orifice elevation: Diameter:
• Riser elevation: Diameter:
• V-notch weir data (alternate):
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 55
Appendix D Maintenance Standards for
Drainage Facilities
The facility-specific maintenance standards contained in this section are intended to be conditions for
determining if maintenance actions are required as identified through inspection. They are not
intended to be measures of the facility's required condition at all times between inspections. In other
words, exceeding these conditions at any time between inspections and/or maintenance does not
automatically constitute a violation of these standards. However, based upon inspection
observations, the inspection and maintenance schedules shall be adjusted to minimize the length of
time that a facility is in a condition that requires a maintenance action.
Table I-D-1. Maintenance Standards
No. 1 – Detention Ponds
Maintenance
Component
Defect Conditions When Maintenance Is
Needed
Results Expected When Maintenance
Is Performed
Trash & Debris Any trash and debris which exceed 5
cubic feet per 1,000 square feet (this is
about equal to the amount of trash it
would take to fill up one standard size
garbage can). In general, there should
be no visual evidence of dumping.
If less than threshold all trash and
debris will be removed as part of next
scheduled maintenance.
Trash and debris cleared from site.
Poisonous
Vegetation and
noxious weeds
Any poisonous or nuisance vegetation
which may constitute a hazard to
maintenance personnel or the public.
Any evidence of noxious weeds as
defined by State or local regulations.
(Apply requirements of adopted IPM
policies for the use of herbicides).
No danger of poisonous vegetation
where maintenance personnel or the
public might normally be. (Coordinate
with local health department)
Complete eradication of noxious weeds
may not be possible. Compliance with
State or local eradication policies
required
Contaminants
and Pollution
Any evidence of oil, gasoline,
contaminants or other pollutants
(Coordinate removal/cleanup with local
water quality response agency).
No contaminants or pollutants present
General
Rodent Holes Any evidence of rodent holes if facility
is acting as a dam or berm, or any
evidence of water piping through dam
or berm via rodent holes.
Rodents destroyed and dam or berm
repaired. (Coordinate with local health
department; coordinate with Ecology
Dam Safety Office if pond exceeds 10
acre-feet.)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 56
No. 1 – Detention Ponds
Maintenance
Component
Defect Conditions When Maintenance Is
Needed
Results Expected When Maintenance
Is Performed
Beaver Dams Dam results in change or function of
the facility.
Facility is returned to design function.
(Coordinate trapping of beavers and
removal of dams with appropriate
permitting agencies)
Insects When insects such as wasps and
hornets interfere with maintenance
activities.
Insects destroyed or removed from site.
Apply insecticides in compliance with
adopted IPM policies
General
Tree Growth
and Hazard
Trees
Tree growth does not allow
maintenance access or interferes
with maintenance activity (i.e., slope
mowing, silt removal, vactoring, or
equipment movements). If trees are
not interfering with access or
maintenance, do not remove
If trees are dead, diseased, or dying.
(Use a certified Arborist to determine
health of tree or removal
requirements)
Trees do not hinder maintenance
activities. Harvested trees should be
recycled into mulch or other beneficial
uses (e.g., alders for firewood).
Remove hazard trees
Side Slopes
of Pond
Erosion Eroded damage over 2 inches deep
where cause of damage is still
present or where there is potential for
continued erosion.
Any erosion observed on a
compacted berm embankment.
Slopes should be stabilized using
appropriate erosion control measure(s);
e.g., rock reinforcement, planting of
grass, compaction.
If erosion is occurring on compacted
berms a licensed civil engineer should
be consulted to resolve source of
erosion.
Sediment Accumulated sediment that exceeds
10% of the designed pond depth
unless otherwise specified or affects
inletting or outletting condition of the
facility.
Sediment cleaned out to designed pond
shape and depth; pond reseeded if
necessary to control erosion.
Storage Area
Liner (If
Applicable)
Liner is visible and has more than
three 1/4-inch holes in it.
Liner repaired or replaced. Liner is fully
covered.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 57
No. 1 – Detention Ponds
Maintenance
Component
Defect Conditions When Maintenance Is
Needed
Results Expected When Maintenance
Is Performed
Settlements Any part of berm which has settled 4
inches lower than the design
elevation.
If settlement is apparent, measure
berm to determine amount of
settlement.
Settling can be an indication of more
severe problems with the berm or
outlet works. A licensed civil engineer
should be consulted to determine the
source of the settlement.
Dike is built back to the design
elevation.
Pond Berms
(Dikes)
Piping Discernable water flow through pond
berm. Ongoing erosion with potential
for erosion to continue.
(Recommend a Geotechnical
engineer be called in to inspect and
evaluate condition and recommend
repair of condition.
Piping eliminated. Erosion potential
resolved.
Tree Growth Tree growth on emergency spillways
creates blockage problems and may
cause failure of the berm due to
uncontrolled overtopping.
Tree growth on berms over 4 feet in
height may lead to piping through the
berm which could lead to failure of
the berm.
Trees should be removed. If root
system is small (base less than 4
inches) the root system may be left in
place. Otherwise the roots should be
removed and the berm restored. A
licensed civil engineer should be
consulted for proper berm/spillway
restoration.
Emergency
Overflow/
Spillway and
Berms over 4
feet in height.
Piping Discernable water flow through pond
berm. Ongoing erosion with potential
for erosion to continue.
(Recommend a Geotechnical
engineer be called in to inspect and
evaluate condition and recommend
repair of condition.
Piping eliminated. Erosion potential
resolved.
Emergency
Overflow/
Spillway
Only one layer of rock exists above
native soil in area five square feet or
larger, or any exposure of native soil
at the top of out flow path of spillway.
(Rip-rap on inside slopes need not be
replaced.)
Rocks and pad depth are restored to
design standards.
Emergency
Overflow/
Spillway
Erosion See “Side Slopes of Pond”
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 58
No. 2 – Infiltration
Maintenance
Component
Defect Conditions When Maintenance
Is Needed
Results Expected When Maintenance
Is Performed
Trash & Debris See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
Poisonous/Noxious
Vegetation
See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
Contaminants and
Pollution
See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
General
Rodent Holes See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1)
Storage Area Sediment Water ponding in infiltration pond
after rainfall ceases and
appropriate time allowed for
infiltration.
(A percolation test pit or test of
facility indicates facility is only
working at 90% of its designed
capabilities. If two inches or
more sediment is present,
remove).
Sediment is removed and/or facility is
cleaned so that infiltration system works
according to design.
Filter Bags (if
applicable)
Filled with
Sediment and
Debris
Sediment and debris fill bag
more than 1/2 full.
Filter bag is replaced or system is
redesigned.
Rock Filters Sediment and
Debris
By visual inspection, little or no
water flows through filter during
heavy rain storms.
Gravel in rock filter is replaced.
Side Slopes of
Pond
Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
Tree Growth See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Emergency
Overflow
Spillway and
Berms over 4
feet in height.
Piping See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
Rock Missing See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Emergency
Overflow
Spillway Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1).
Pre-settling
Ponds and
Vaults
Facility or sump
filled with sediment
and/or debris
6" or designed sediment trap
depth of sediment.
Sediment is removed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 59
No. 3 – Closed Detention Systems (Tanks/Vaults)
Maintenance
Component
Defect Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Plugged Air Vents One-half of the cross section of a vent is
blocked at any point or the vent is
damaged.
Vents open and functioning.
Debris and
Sediment
Accumulated sediment depth exceeds
10% of the diameter of the storage area
for 1/2 length of storage vault or any
point depth exceeds 15% of diameter.
(Example: 72-inch storage tank would
require cleaning when sediment reaches
depth of 7 inches for more than 1/2
length of tank.)
All sediment and debris removed
from storage area.
Joints Between
Tank/Pipe Section
Any openings or voids allowing material
to be transported into facility.
(Will require engineering analysis to
determine structural stability).
All joint between tank/pipe
sections are sealed.
Tank Pipe Bent
Out of Shape
Any part of tank/pipe is bent out of shape
more than 10% of its design shape.
(Review required by engineer to
determine structural stability).
Tank/pipe repaired or replaced to
design.
Cracks wider than 1/2-inch and any
evidence of soil particles entering the
structure through the cracks, or
maintenance/inspection personnel
determines that the vault is not
structurally sound.
Vault replaced or repaired to
design specifications and is
structurally sound.
Storage
Area
Vault Structure
Includes Cracks in
Wall, Bottom,
Damage to Frame
and/or Top Slab
Cracks wider than 1/2-inch at the joint of
any inlet/outlet pipe or any evidence of
soil particles entering the vault through
the walls.
No cracks more than 1/4-inch
wide at the joint of the inlet/outlet
pipe.
Cover Not in
Place
Cover is missing or only partially in
place. Any open manhole requires
maintenance.
Manhole is closed.
Locking
Mechanism Not
Working
Mechanism cannot be opened by one
maintenance person with proper tools.
Bolts into frame have less than 1/2 inch
of thread (may not apply to self-locking
lids).
Mechanism opens with proper
tools.
Cover Difficult to
Remove
One maintenance person cannot remove
lid after applying normal lifting pressure.
Intent is to keep cover from sealing off
access to maintenance.
Cover can be removed and
reinstalled by one maintenance
person.
Manhole
Ladder Rungs
Unsafe
Ladder is unsafe due to missing rungs,
misalignment, not securely attached to
structure wall, rust, or cracks.
Ladder meets design standards.
Allows maintenance person safe
access.
Catch
Basins
See “Catch
Basins”
(No. 5)
See “Catch Basins” (No. 5). See “Catch Basins” (No. 5).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 60
No. 4 – Control Structure/Flow Restrictor
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance
is Performed
Trash and
Debris (Includes
Sediment)
Material exceeds 25% of sump
depth or 1 foot below orifice plate.
Control structure orifice is not blocked.
All trash and debris removed.
Structure is not securely attached
to manhole wall.
Structure securely attached to wall and
outlet pipe.
Structure is not in upright position
(allow up to 10% from plumb).
Structure in correct position.
Connections to outlet pipe are not
watertight and show signs of rust.
Connections to outlet pipe are water
tight; structure repaired or replaced and
works as designed.
General
Structural
Damage
Any holes--other than designed
holes--in the structure.
Structure has no holes other than
designed holes.
Cleanout gate is not watertight, is
missing, or is left open.
Gate is watertight, works as designed,
and is left closed.
Gate cannot be moved up and
down by one maintenance person.
Gate moves up and down easily and is
watertight.
Chain/rod leading to gate is
missing or damaged.
Chain is in place and works as
designed.
Cleanout
Gate
Damaged or
Missing
Gate is rusted over 50% of its
surface area.
Gate is repaired or replaced to meet
design standards.
Damaged or
Missing
Control device is not working
properly due to missing, out of
place, or bent orifice plate.
Plate is in place and works as designed. Orifice Plate
Obstructions Any trash, debris, sediment, or
vegetation blocking the plate.
Plate is free of all obstructions and
works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or
having the potential of blocking) the
overflow pipe.
Pipe is free of all obstructions and
works as designed.
Manhole See “Closed
Detention
Systems” (No.
3).
See “Closed Detention Systems”
(No. 3).
See “Closed Detention Systems” (No.
3).
Catch Basin See “Catch
Basins”
(No. 5).
See “Catch Basins” (No. 5). See “Catch Basins” (No. 5).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 61
No. 5 – Catch Basins
Maintenance
Component
Defect Conditions When Maintenance is Needed Results Expected When
Maintenance is performed
Trash or debris which is located
immediately in front of the catch basin
opening or is blocking inletting capacity
of the basin by more than 10%.
No Trash or debris located
immediately in front of catch
basin or on grate opening.
Trash or debris (in the basin) that
exceeds 60 percent of the sump depth
as measured from the bottom of basin to
invert of the lowest pipe into or out of the
basin, but in no case less than a
minimum of six inches clearance from
the debris surface to the invert of the
lowest pipe.
No trash or debris in the catch
basin.
Trash or debris in any inlet or outlet pipe
blocking more than 1/3 of its height.
Inlet and outlet pipes free of
trash or debris.
Trash & Debris
Dead animals or vegetation that could
generate odors that could cause
complaints or dangerous gases (e.g.,
methane).
No dead animals or vegetation
present within the catch basin.
Sediment Sediment (in the basin) that exceeds 60
percent of the sump depth as measured
from the bottom of basin to invert of the
lowest pipe into or out of the basin, but in
no case less than a minimum of 6 inches
clearance from the sediment surface to
the invert of the lowest pipe.
No sediment in the catch basin
Top slab has holes larger than 2 square
inches or cracks wider than 1/4 inch
(Intent is to make sure no material is
running into basin).
Top slab is free of holes and
cracks.
Structure Damage
to Frame and/or
Top Slab
Frame not sitting flush on top slab, i.e.,
separation of more than 3/4 inch of the
frame from the top slab. Frame not
securely attached
Frame is sitting flush on the
riser rings or top slab and firmly
attached.
Maintenance person judges that
structure is unsound.
Basin replaced or repaired to
design standards.
Fractures or
Cracks in Basin
Walls/ Bottom Grout fillet has separated or cracked
wider than 1/2 inch and longer than 1
foot at the joint of any inlet/outlet pipe or
any evidence of soil particles entering
catch basin through cracks.
Pipe is regrouted and secure at
basin wall.
Settlement/
Misalignment
If failure of basin has created a safety,
function, or design problem.
Basin replaced or repaired to
design standards.
Vegetation growing across and blocking
more than 10% of the basin opening.
No vegetation blocking opening
to basin.
General
Vegetation
Vegetation growing in inlet/outlet pipe
joints that is more than six inches tall and
less than six inches apart.
No vegetation or root growth
present.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 62
No. 5 – Catch Basins (continued)
Maintenance
Component
Defect Conditions When Maintenance is
Needed
Results Expected When Maintenance is
performed
General Contamination
and Pollution
See "Detention Ponds" (No. 1). No pollution present.
Cover Not in
Place
Cover is missing or only partially in
place. Any open catch basin
requires maintenance.
Catch basin cover is closed
Locking
Mechanism Not
Working
Mechanism cannot be opened by
one maintenance person with
proper tools. Bolts into frame have
less than 1/2 inch of thread.
Mechanism opens with proper tools.
Catch Basin
Cover
Cover Difficult
to Remove
One maintenance person cannot
remove lid after applying normal
lifting pressure.
(Intent is keep cover from sealing
off access to maintenance.)
Cover can be removed by one
maintenance person.
Ladder Ladder Rungs
Unsafe
Ladder is unsafe due to missing
rungs, not securely attached to
basin wall, misalignment, rust,
cracks, or sharp edges.
Ladder meets design standards and
allows maintenance person safe
access.
Grate opening
Unsafe
Grate with opening wider than 7/8
inch.
Grate opening meets design
standards.
Trash and
Debris
Trash and debris that is blocking
more than 20% of grate surface
inletting capacity.
Grate free of trash and debris.
Metal Grates
(If Applicable)
Damaged or
Missing.
Grate missing or broken member(s)
of the grate.
Grate is in place and meets design
standards.
No. 6 – Debris Barriers (e.g., Trash Racks)
Maintenance
Components
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
General Trash and
Debris
Trash or debris that is plugging
more than 20% of the openings in
the barrier.
Barrier cleared to design flow capacity.
Bars are bent out of shape more
than 3 inches.
Bars in place with no bends more than
3/4 inch.
Bars are missing or entire barrier
missing.
Bars in place according to design.
Damaged/
Missing Bars.
Bars are loose and rust is causing
50% deterioration to any part of
barrier.
Barrier replaced or repaired to design
standards.
Metal
Inlet/Outlet Pipe Debris barrier missing or not
attached to pipe
Barrier firmly attached to pipe
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 63
No. 7 – Energy Dissipaters
Maintenance
Components
Defect Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
External:
Missing or Moved
Rock
Only one layer of rock exists above
native soil in area five square feet or
larger, or any exposure of native soil.
Rock pad replaced to design
standards.
Rock Pad
Erosion Soil erosion in or adjacent to rock pad. Rock pad replaced to design
standards.
Pipe Plugged with
Sediment
Accumulated sediment that exceeds
20% of the design depth.
Pipe cleaned/flushed so that it
matches design.
Not Discharging
Water Properly
Visual evidence of water discharging at
concentrated points along trench (normal
condition is a “sheet flow” of water along
trench). Intent is to prevent erosion
damage.
Trench redesigned or rebuilt to
standards.
Perforations
Plugged.
Over 1/2 of perforations in pipe are
plugged with debris and sediment.
Perforated pipe cleaned or
replaced.
Water Flows Out
Top of
“Distributor” Catch
Basin.
Maintenance person observes or
receives credible report of water flowing
out during any storm less than the design
storm or its causing or appears likely to
cause damage.
Facility rebuilt or redesigned to
standards.
Dispersion
Trench
Receiving Area
Over-Saturated
Water in receiving area is causing or has
potential of causing landslide problems.
No danger of landslides.
Internal:
Worn or Damaged
Post, Baffles, Side
of Chamber
Structure dissipating flow deteriorates to
1/2 of original size or any concentrated
worn spot exceeding one square foot
which would make structure unsound.
Structure replaced to design
standards.
Manhole/Ch
amber
Other Defects See “Catch Basins” (No. 5). See “Catch Basins” (No. 5).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 64
No. 8 – Typical Biofiltration Swale
Maintenance
Component
Defect or Problem Condition When
Maintenance is Needed
Recommended Maintenance to Correct Problem
Sediment
Accumulation on
Grass
Sediment depth
exceeds 2 inches.
Remove sediment deposits on grass treatment area
of the bio-swale. When finished, swale should be
level from side to side and drain freely toward outlet.
There should be no areas of standing water once
inflow has ceased.
Standing Water When water stands in
the swale between
storms and does not
drain freely.
Any of the following may apply: remove sediment or
trash blockages, improve grade from head to foot of
swale, remove clogged check dams, add
underdrains or convert to a wet biofiltration swale.
Flow spreader Flow spreader uneven
or clogged so that
flows are not uniformly
distributed through
entire swale width.
Level the spreader and clean so that flows are
spread evenly over entire swale width.
Constant
Baseflow
When small quantities
of water continually
flow through the swale,
even when it has been
dry for weeks, and an
eroded, muddy
channel has formed in
the swale bottom.
Add a low-flow pea-gravel drain the length of the
swale or by-pass the baseflow around the swale.
Poor Vegetation
Coverage
When grass is sparse
or bare or eroded
patches occur in more
than 10% of the swale
bottom.
Determine why grass growth is poor and correct that
condition. Re-plant with plugs of grass from the
upper slope: plant in the swale bottom at 8-inch
intervals. Or re-seed into loosened, fertile soil.
Vegetation When the grass
becomes excessively
tall (greater than 10-
inches); when
nuisance weeds and
other vegetation starts
to take over.
Mow vegetation or remove nuisance vegetation so
that flow not impeded. Grass should be mowed to a
height of 3 to 4 inches. Remove grass clippings.
Excessive
Shading
Grass growth is poor
because sunlight does
not reach swale.
If possible, trim back over-hanging limbs and
remove brushy vegetation on adjacent slopes.
Inlet/Outlet Inlet/outlet areas
clogged with sediment
and/or debris.
Remove material so that there is no clogging or
blockage in the inlet and outlet area.
Trash and Debris
Accumulation
Trash and debris
accumulated in the
bio-swale.
Remove trash and debris from bioswale.
General
Erosion/Scouring Eroded or scoured
swale bottom due to
flow channelization, or
higher flows.
For ruts or bare areas less than 12 inches wide,
repair the damaged area by filling with crushed
gravel. If bare areas are large, generally greater
than 12 inches wide, the swale should be re-graded
and re-seeded. For smaller bare areas, overseed
when bare spots are evident, or take plugs of grass
from the upper slope and plant in the swale bottom
at 8-inch intervals.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 65
No. 9 – Wet Biofiltration Swale
Maintenance
Component
Defect or Problem Condition When Maintenance is
Needed
Recommended Maintenance to Correct
Problem
Sediment
Accumulation
Sediment depth exceeds 2-
inches in 10% of the swale
treatment area.
Remove sediment deposits in
treatment area.
Water Depth
Water not retained to a depth of
about 4 inches during the wet
season.
Build up or repair outlet berm so that
water is retained in the wet swale.
Wetland
Vegetation
Vegetation becomes sparse
and does not provide adequate
filtration, OR vegetation is
crowded out by very dense
clumps of cattail, which do not
allow water to flow through the
clumps.
Determine cause of lack of vigor of
vegetation and correct. Replant as
needed. For excessive cattail growth,
cut cattail shoots back and compost
off-site. Note: normally wetland
vegetation does not need to be
harvested unless die-back is causing
oxygen depletion in downstream
waters.
Inlet/Outlet Inlet/outlet area clogged with
sediment and/or debris.
Remove clogging or blockage in the
inlet and outlet areas.
Trash and
Debris
Accumulation
See "Detention Ponds" (No. 1). Remove trash and debris from wet
swale.
General
Erosion/Scouring Swale has eroded or scoured
due to flow channelization, or
higher flows.
Check design flows to assure swale is
large enough to handle flows. By-pass
excess flows or enlarge swale. Replant
eroded areas with fibrous-rooted
plants such as Juncus effusus (soft
rush) in wet areas or snowberry
(Symphoricarpos albus) in dryer areas.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 66
No. 10 – Filter Strips
Maintenance
Component
Defect or Problem Condition When
Maintenance is Needed
Recommended Maintenance to Correct
Problem
Sediment
Accumulation on
Grass
Sediment depth exceeds 2
inches.
Remove sediment deposits, re-level so
slope is even and flows pass evenly through
strip.
Vegetation When the grass becomes
excessively tall (greater
than 10-inches); when
nuisance weeds and other
vegetation starts to take
over.
Mow grass, control nuisance vegetation,
such that flow not impeded. Grass should be
mowed to a height between 3-4 inches.
Trash and Debris
Accumulation
Trash and debris
accumulated on the filter
strip.
Remove trash and Debris from filter.
Erosion/Scouring Eroded or scoured areas
due to flow channelization,
or higher flows.
For ruts or bare areas less than 12 inches
wide, repair the damaged area by filling with
crushed gravel. The grass will creep in over
the rock in time. If bare areas are large,
generally greater than 12 inches wide, the
filter strip should be re-graded and re-
seeded. For smaller bare areas, overseed
when bare spots are evident.
General
Flow spreader Flow spreader uneven or
clogged so that flows are
not uniformly distributed
through entire filter width.
Level the spreader and clean so that flows
are spread evenly over entire filter width.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 67
No. 11 – Wetponds
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Water level
First cell is empty, does not hold
water.
Line the first cell to maintain at least 4 feet of
water. Although the second cell may drain, the
first cell must remain full to control turbulence of
the incoming flow and reduce sediment
resuspension.
Trash and
Debris
Accumulation that exceeds 1 CF
per 1000-SF of pond area.
Trash and debris removed from pond.
Inlet/Outlet
Pipe
Inlet/Outlet pipe clogged with
sediment and/or debris material.
No clogging or blockage in the inlet and outlet
piping.
Sediment
Accumulati
on in Pond
Bottom
Sediment accumulations in pond
bottom that exceeds the depth of
sediment zone plus 6-inches,
usually in the first cell.
Sediment removed from pond bottom.
Oil Sheen
on Water
Prevalent and visible oil sheen. Oil removed from water using oil-absorbent
pads or vactor truck. Source of oil located and
corrected. If chronic low levels of oil persist,
plant wetland plants such as Juncus effusus
(soft rush) which can uptake small
concentrations of oil.
Erosion Erosion of the pond’s side slopes
and/or scouring of the pond
bottom, that exceeds 6-inches, or
where continued erosion is
prevalent.
Slopes stabilized using proper erosion control
measures and repair methods.
Settlement
of Pond
Dike/Berm
Any part of these components
that has settled 4-inches or lower
than the design elevation, or
inspector determines dike/berm
is unsound.
Dike/berm is repaired to specifications.
Internal
Berm
Berm dividing cells should be
level.
Berm surface is leveled so that water flows
evenly over entire length of berm.
General
Overflow
Spillway
Rock is missing and soil is
exposed at top of spillway or
outside slope.
Rocks replaced to specifications.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 68
No. 12 – Wetvaults
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Trash/Debris
Accumulation
Trash and debris accumulated in
vault, pipe or inlet/outlet
(includes floatables and non-
floatables).
Remove trash and debris from vault.
Sediment
Accumulation in
Vault
Sediment accumulation in vault
bottom exceeds the depth of the
sediment zone plus 6-inches.
Remove sediment from vault.
Damaged Pipes Inlet/outlet piping damaged or
broken and in need of repair.
Pipe repaired and/or replaced.
Access Cover
Damaged/Not
Working
Cover cannot be opened or
removed, especially by one
person.
Pipe repaired or replaced to proper
working specifications.
Ventilation Ventilation area blocked or
plugged.
Blocking material removed or cleared from
ventilation area. A specified % of the vault
surface area must provide ventilation to
the vault interior (see design
specifications).
Maintenance/inspection
personnel determine that the
vault is not structurally sound.
Vault replaced or repairs made so that
vault meets design specifications and is
structurally sound.
Vault Structure
Damage -
Includes Cracks
in Walls Bottom,
Damage to
Frame and/or
Top Slab
Cracks wider than 1/2-inch at the
joint of any inlet/outlet pipe or
evidence of soil particles entering
through the cracks.
Vault repaired so that no cracks exist
wider than 1/4-inch at the joint of the
inlet/outlet pipe.
Baffles Baffles corroding, cracking,
warping and/or showing signs of
failure as determined by
maintenance/inspection staff.
Baffles repaired or replaced to
specifications.
General
Access Ladder
Damage
Ladder is corroded or
deteriorated, not functioning
properly, not attached to
structure wall, missing rungs, has
cracks and/or misaligned.
Confined space warning sign
missing.
Ladder replaced or repaired to
specifications, and is safe to use as
determined by inspection personnel.
Replace sign warning of confined space
entry requirements. Ladder and entry
notification complies with OSHA
standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 69
No. 13 – Sand Filters (above ground/open)
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Sediment
Accumulatio
n on top
layer
Sediment depth exceeds 1/2-
inch.
No sediment deposit on grass
layer of sand filter that would
impede permeability of the filter
section.
Trash and
Debris
Accumulatio
ns
Trash and debris accumulated
on sand filter bed.
Trash and debris removed from
sand filter bed.
Sediment/
Debris in
Clean-Outs
When the clean-outs become
full or partially plugged with
sediment and/or debris.
Sediment removed from clean-
outs.
Sand Filter
Media
Drawdown of water through the
sand filter media takes longer
than 24-hours, and/or flow
through the overflow pipes
occurs frequently.
Top several inches of sand are
scraped. May require
replacement of entire sand filter
depth depending on extent of
plugging (a sieve analysis is
helpful to determine if the lower
sand has too high a proportion of
fine material).
Prolonged
Flows
Sand is saturated for prolonged
periods of time (several weeks)
and does not dry out between
storms due to continuous base
flow or prolonged flows from
detention facilities.
Low, continuous flows are limited
to a small portion of the facility by
using a low wooden divider or
slightly depressed sand surface.
Short
Circuiting
When flows become
concentrated over one section
of the sand filter rather than
dispersed.
Flow and percolation of water
through sand filter is uniform and
dispersed across the entire filter
area.
Erosion
Damage to
Slopes
Erosion over 2-inches deep
where cause of damage is
prevalent or potential for
continued erosion is evident.
Slopes stabilized using proper
erosion control measures.
Rock Pad
Missing or
Out of Place
Soil beneath the rock is visible. Rock pad replaced or rebuilt to
design specifications.
Flow
Spreader
Flow spreader uneven or
clogged so that flows are not
uniformly distributed across
sand filter.
Spreader leveled and cleaned so
that flows are spread evenly over
sand filter.
Above Ground
(open sand
filter)
Damaged
Pipes
Any part of the piping that is
crushed or deformed more than
20% or any other failure to the
piping.
Pipe repaired or replaced.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 70
No. 14 –Sand Filters (below ground/enclosed)
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When
Maintenance is Performed
Sediment
Accumulation on
Sand Media
Section
Sediment depth exceeds 1/2-inch. No sediment deposits on sand filter
section that which would impede
permeability of the filter section.
Sediment
Accumulation in
Pre-Settling
Portion of Vault
Sediment accumulation in vault bottom
exceeds the depth of the sediment zone
plus 6-inches.
No sediment deposits in first
chamber of vault.
Trash/Debris
Accumulation
Trash and debris accumulated in vault,
or pipe inlet/outlet, floatables and non-
floatables.
Trash and debris removed from
vault and inlet/outlet piping.
Sediment in Drain
Pipes/Cleanouts
When drain pipes, cleanouts become
full with sediment and/or debris.
Sediment and debris removed.
Short Circuiting When seepage/flow occurs along the
vault walls and corners. Sand eroding
near inflow area.
Sand filter media section re-laid
and compacted along perimeter of
vault to form a semi-seal. Erosion
protection added to dissipate force
of incoming flow and curtail
erosion.
Damaged Pipes Inlet or outlet piping damaged or broken
and in need of repair.
Pipe repaired and/or replaced.
Access Cover
Damaged/Not
Working
Cover cannot be opened,
corrosion/deformation of cover.
Maintenance person cannot remove
cover using normal lifting pressure.
Cover repaired to proper working
specifications or replaced.
Ventilation Ventilation area blocked or plugged Blocking material removed or
cleared from ventilation area. A
specified % of the vault surface
area must provide ventilation to the
vault interior (see design
specifications).
Cracks wider than 1/2-inch or evidence
of soil particles entering the structure
through the cracks, or
maintenance/inspection personnel
determine that the vault is not
structurally sound.
Vault replaced or repairs made so
that vault meets design
specifications and is structurally
sound.
Vault Structure
Damaged;
Includes Cracks
in Walls, Bottom,
Damage to Frame
and/or Top Slab.
Cracks wider than 1/2-inch at the joint
of any inlet/outlet pipe or evidence of
soil particles entering through the
cracks.
Vault repaired so that no cracks
exist wider than 1/4-inch at the
joint of the inlet/outlet pipe.
Baffles/Internal
walls
Baffles or walls corroding, cracking,
warping and/or showing signs of failure
as determined by
maintenance/inspection person.
Baffles repaired or replaced to
specifications.
Below Ground
Vault.
Access Ladder
Damaged
Ladder is corroded or deteriorated, not
functioning properly, not securely
attached to structure wall, missing
rungs, cracks, and misaligned
Ladder replaced or repaired to
specifications, and is safe to use
as determined by inspection
personnel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 71
No. 15 – STORMFILTERTM
Maintenance
Component
Defect Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Sediment
Accumulation on
Media.
Sediment depth exceeds 0.25-inches. No sediment deposits which
would impede permeability of
the compost media.
Sediment
Accumulation in
Vault
Sediment depth exceeds 6-inches in first
chamber.
No sediment deposits in vault
bottom of first chamber.
Trash/Debris
Accumulation
Trash and debris accumulated on
compost filter bed.
Trash and debris removed from
the compost filter bed.
Sediment in
Drain
Pipes/Clean-
Outs
When drain pipes, clean-outs, become
full with sediment and/or debris.
Sediment and debris removed.
Damaged Pipes Any part of the pipes that are crushed or
damaged due to corrosion and/or
settlement.
Pipe repaired and/or replaced.
Access Cover
Damaged/Not
Working
Cover cannot be opened; one person
cannot open the cover using normal
lifting pressure, corrosion/deformation of
cover.
Cover repaired to proper
working specifications or
replaced.
Cracks wider than 1/2-inch or evidence
of soil particles entering the structure
through the cracks, or
maintenance/inspection personnel
determine that the vault is not structurally
sound.
Vault replaced or repairs made
so that vault meets design
specifications and is structurally
sound.
Vault Structure
Includes Cracks
in Wall, Bottom,
Damage to
Frame and/or
Top Slab
Cracks wider than 1/2-inch at the joint of
any inlet/outlet pipe or evidence of soil
particles entering through the cracks.
Vault repaired so that no cracks
exist wider than 1/4-inch at the
joint of the inlet/outlet pipe.
Baffles Baffles corroding, cracking warping,
and/or showing signs of failure as
determined by maintenance/inspection
person.
Baffles repaired or replaced to
specifications.
Below Ground
Vault
Access Ladder
Damaged
Ladder is corroded or deteriorated, not
functioning properly, not securely
attached to structure wall, missing rungs,
cracks, and misaligned.
Ladder replaced or repaired and
meets specifications, and is
safe to use as determined by
inspection personnel.
Media Drawdown of water through the media
takes longer than 1 hour, and/or overflow
occurs frequently.
Media cartridges replaced. Below Ground
Cartridge Type
Short Circuiting Flows do not properly enter filter
cartridges.
Filter cartridges replaced.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 72
No. 16 – Baffle Oil/Water Separators (API Type)
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance
is Performed
Monitoring Inspection of discharge water for
obvious signs of poor water
quality.
Effluent discharge from vault should
be clear with out thick visible sheen.
Sediment
Accumulation
Sediment depth in bottom of vault
exceeds 6-inches in depth.
No sediment deposits on vault
bottom that would impede flow
through the vault and reduce
separation efficiency.
Trash and Debris
Accumulation
Trash and debris accumulation in
vault, or pipe inlet/outlet,
floatables and non-floatables.
Trash and debris removed from
vault, and inlet/outlet piping.
Oil Accumulation Oil accumulations that exceed 1-
inch, at the surface of the water.
Extract oil from vault by vactoring.
Disposal in accordance with state
and local rules and regulations.
Damaged Pipes Inlet or outlet piping damaged or
broken and in need of repair.
Pipe repaired or replaced.
Access Cover
Damaged/Not
Working
Cover cannot be opened,
corrosion/deformation of cover.
Cover repaired to proper working
specifications or replaced.
See “Catch Basins” (No. 5)
Vault replaced or repairs made so
that vault meets design
specifications and is structurally
sound.
Vault Structure
Damage - Includes
Cracks in Walls
Bottom, Damage to
Frame and/or Top
Slab Cracks wider than 1/2-inch at the
joint of any inlet/outlet pipe or
evidence of soil particles entering
through the cracks.
Vault repaired so that no cracks
exist wider than 1/4-inch at the joint
of the inlet/outlet pipe.
Baffles Baffles corroding, cracking,
warping and/or showing signs of
failure as determined by
maintenance/inspection person.
Baffles repaired or replaced to
specifications.
General
Access Ladder
Damaged
Ladder is corroded or
deteriorated, not functioning
properly, not securely attached to
structure wall, missing rungs,
cracks, and misaligned.
Ladder replaced or repaired and
meets specifications, and is safe to
use as determined by inspection
personnel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 73
No. 17 – Coalescing Plate Oil/Water Separators
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance
is Performed
Monitoring Inspection of discharge water for
obvious signs of poor water
quality.
Effluent discharge from vault
should be clear with no thick visible
sheen.
Sediment
Accumulation
Sediment depth in bottom of vault
exceeds 6-inches in depth and/or
visible signs of sediment on
plates.
No sediment deposits on vault
bottom and plate media, which
would impede flow through the
vault and reduce separation
efficiency.
Trash and Debris
Accumulation
Trash and debris accumulated in
vault, or pipe inlet/outlet,
floatables and non-floatables.
Trash and debris removed from
vault, and inlet/outlet piping.
Oil Accumulation Oil accumulation that exceeds 1-
inch at the water surface.
Oil is extracted from vault using
vactoring methods. Coalescing
plates are cleaned by thoroughly
rinsing and flushing. Should be no
visible oil depth on water.
Damaged
Coalescing Plates
Plate media broken, deformed,
cracked, and/or showing signs of
failure.
A portion of the media pack or the
entire plate pack is replaced
depending on severity of failure.
Damaged Pipes Inlet or outlet piping damaged or
broken and in need of repair.
Pipe repaired and or replaced.
Baffles Baffles corroding, cracking,
warping and/or showing signs of
failure as determined by
maintenance/inspection person.
Baffles repaired or replaced to
specifications.
Cracks wider than 1/2-inch or
evidence of soil particles entering
the structure through the cracks,
or maintenance/inspection
personnel determine that the vault
is not structurally sound.
Vault replaced or repairs made so
that vault meets design
specifications and is structurally
sound.
Vault Structure
Damage -
Includes Cracks in
Walls, Bottom,
Damage to Frame
and/or Top Slab
Cracks wider than 1/2-inch at the
joint of any inlet/outlet pipe or
evidence of soil particles entering
through the cracks.
Vault repaired so that no cracks
exist wider than 1/4-inch at the joint
of the inlet/outlet pipe.
General
Access Ladder
Damaged
Ladder is corroded or
deteriorated, not functioning
properly, not securely attached to
structure wall, missing rungs,
cracks, and misaligned.
Ladder replaced or repaired and
meets specifications, and is safe to
use as determined by inspection
personnel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 74
No. 18 – Catchbasin Inserts
Maintenance
Component
Defect Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Sediment
Accumulation
When sediment forms a cap over the
insert media of the insert and/or unit.
No sediment cap on the insert
media and its unit.
Trash and
Debris
Accumulation
Trash and debris accumulates on insert
unit creating a blockage/restriction.
Trash and debris removed
from insert unit. Runoff freely
flows into catch basin.
Media Insert Not
Removing Oil
Effluent water from media insert has a
visible sheen.
Effluent water from media
insert is free of oils and has no
visible sheen.
Media Insert
Water Saturated
Catch basin insert is saturated with water
and no longer has the capacity to
absorb.
Remove and replace media
insert
Media Insert-Oil
Saturated
Media oil saturated due to petroleum spill
that drains into catch basin.
Remove and replace media
insert.
General
Media Insert Use
Beyond Normal
Product Life
Media has been used beyond the typical
average life of media insert product.
Remove and replace media at
regular intervals, depending on
insert product.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 75
No. 19 – Ecology Embankment
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Erosion, scour, or
vehicular damage
No vegetation zone uneven or
clogged so that flows are not
uniformly distributed
Level the area and clean so that flows
are spread evenly
No Vegetation
Zone adjacent
to pavement
Sediment
accumulation on
edge of pavement
Flows no longer sheeting off of
roadway. Sediment accumulation
on pavement edge exceeds top of
pavement elevation.
Remove sediment deposits such that
flows can sheet off of roadway.
Sediment
accumulation on
grass
Sediment depth exceeds two
inches
Remove sediment deposits, re-level
so slope is even and flows pass
evenly through Ecology Embankment.
Excessive vegetation
or undesirable
species
When grass becomes excessively
tall; when nuisance weeds and
other vegetation starts to take
over or shades out desirable
vegetation growth characteristics.
See also Pierce County Noxious
Weeds list at:
piercecountyweedboard.wsu.edu/
weedlist.html
Mow grass, control nuisance
vegetation such that flow is not
impeded. Grass should be mowed to a
height that encourages dense, even
herbaceous growth.
Vegetated
Filter
Erosion, scour, or
vehicular damage
Eroded or scoured areas due to
flow channelization, high flows, or
vehicular damage.
For ruts or bare areas less than 12
inches wide, repair the damaged area
by filling with suitable topsoil. The
grass will creep in over the rock in
time. If bare areas are large, generally
greater than 12 inches wide, the filter
strip should be re-graded and re-
seeded. For smaller bare areas,
overseed when bare spots are
evident.
Erosion, scour, or
vehicular damage
Eroded or scoured areas due to
flow channelization, high flows, or
vehicular damage.
For ruts or bare areas less than 12
inches wide, repair the damaged area
by filling with suitable media. If bare
areas are large, generally greater than
12 inches wide, the media bed should
be re-graded.
Media Bed
Sediment
accumulation on
media bed
Sediment depth inhibits free
infiltration of water
Remove sediment deposits, re-level
so slope is even and flows pass freely
through the media bed.
Underdrains Sediment Depth of sediment within
perforated pipe exceeds one-half
inch
Flush underdrains through access
ports and collect flushed sediment.
General Trash and debris
accumulation
Trash and debris which exceed 5
cubic feet per 1,000 square feet
(this is about equal to the amount
of trash it would take to fill up one
32-gallow garbage can). In
general, there should be no visual
evidence of dumping. If less than
threshold, all trash and debris will
be removed as part of the next
scheduled maintenance
Remove trash and debris.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 76
No. 19 – Ecology Embankment
Maintenance
Component
Defect Condition When Maintenance is
Needed
Results Expected When Maintenance is
Performed
General Flows are bypassing
Ecology
Embankment
Evidence of significant flows
downslope (rills, sediment,
vegetation damage, etc.) of
Ecology Embankment
Remove sediment deposits, relevel so
slope is even and flows pass evenly
through Ecology Embankment. If
Ecology Embankment is completely
clogged, it may require more extensive
repair or replacement.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 77
No. 20 – Bioretention Rain Gardens
Maintenance
Component
Defect Conditions When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Cracks or failure
in concrete
planter reservoir
Cracks wider than ½ inch or
maintenance/inspection personnel
determine that the vault is not
structurally sound
Vault repaired or replaced so that it
meets design specification and is
structurally sound
Erosion (gullies/rills) greater than 2
inches around inlets, outlet, and
along side slopes
Eliminate source of erosion and stabilize
damaged area (regrade, rock,
vegetation, erosion control blanket)
Settlement greater than 4 inches
(relative to undisturbed sections of
the berm)
Restore to design height
Downstream face of the berm or
embankment wet, seeps or leaks
evident
Plug holes. Contact geotechnical
engineer ASAP.
Failure in
earthen reservoir
(embankments,
dikes, berms,
and side slopes)
Any evidence of rodent holes or
water piping around holes if facility
acts as a dam or berm
Eradicate rodents and repair holes (fill
and compact)
Sediment or
debris
accumulation
Accumulation of sediment or debris Remove excess sediment or debris.
Identify and control the sediment
source, if feasible. Facility should be
free of material. May contain standing
water.
Rockery
reservoir or walls
Rock walls are insecure Stabilize walls
Basin inlet via
surface flow
Soil is exposed or signs of erosion
are visible.
Repair and control erosion sources.
Basin inlet via
concentrated
flow (e.g. curb
cuts)
Sediment, vegetation, or debris
partially or fully blocking inlet
structure
Clear the blockage. Identify the source
of the blockage and take actions to
prevent future blockages.
Water splashes adjacent buildings Basin inlet
splash block
failure Water disrupts soil media.
Reconfigure/repair blocks.
Pipe is damaged. Repair/replace pipe. Inlet/outlet pipe
failure Pipe is clogged. Remove roots or debris.
Outlet pipe/
structure failure
Sediment, vegetation, or debris is
partially or fully blocking the outlet
structure.
Clear the blockage. Identify the source
of the blockage and take actions to
prevent future blockages.
Trash or debris present on trash
rack.
Clean and dispose of trash. Trash rack
failure
Bar screen damaged or missing. Replace bar screen.
Ponding Area
Check dams and
weirs failures
Sediment, vegetation, or debris is
partially or fully blocking the check
dam or weir.
Clear the blockage. Identify the source
of the blockage and take actions to
prevent future blockages.
Ponding Area Check dams and
weirs failures
Erosion and/or undercutting is
present.
Repair and take preventative measures
to prevent future erosion and/or
undercutting.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 78
No. 20 – Bioretention Rain Gardens
Maintenance
Component
Defect Conditions When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Sediment blocks 35% or more of
ports/notches or, sediment fills 35%
or more of sediment trap.
Remove and dispose of sediment. Flow spreader
problems
Grade board/baffle damaged or not
level.
Remove and reinstall to level position.
Overflow spillway is partially or fully
plugged with sediment or debris.
Remove and dispose of sediment.
Native soil is exposed, or other
signs of erosion are present.
Repair erosion and stabilize surface of
spillway.
Overflow/
emergency
spillway
Spillway armament is missing. Replace armament.
Bioretention soil Water remains in the basin 48 hours
or longer after the end of a storm.
Ensure that underdrain (if present) is not
clogged. If necessary, clear underdrain.
If this is not the problem, the
bioretention soil is likely clogged.
Remove the upper 2 to 3 inches of soil
and replace with imported bioretention
soil. Identify sources of clogging and
correct.
Bottom swale
vegetation
Less than 80% of swale bottom is
covered with healthy wetland
vegetation.
Upland slope
vegetation
Less than 70% of upland slopes are
covered with healthy vegetation.
Plant additional vegetation. Ideally,
planting should be performed in the fall
or winter.
Large trees and shrubs interfere
with operation of the basin or
access for maintenance
Prune or remove large trees and
shrubs.
Trees and
shrubs
Standing dead vegetation is present Remove standing dead vegetation when
covering greater than 10% of the basin
area. Replace dead vegetation annually
or immediately if necessary to control
erosion (e.g. on a steep slope).
Mulch Bare spots (without much cover) are
present or mulch covers less than 3
inches deep for compost or 4 inches
deep for coarse, woody mulch.
Replenish with the appropriate type of
mulch to cover bare spots and augment
to minimum depth.
Vegetation
Clippings Grass or other vegetation clippings
accumulate to 2 inches or greater in
depth.
Remove clippings.
Noxious weeds Listed noxious vegetation is present.
See Pierce County noxious weed
list.
By law, noxious weeds must be
removed and disposed immediately.
Herbicides and pesticides shall not be
used in order to protect water quality.
Vegetation
Weeds Weeds are present (unless on edge
and providing erosion control).
Remove and dispose of weed material.
Herbicides and pesticides shall not be
used in order to protect water quality.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 79
No. 20 – Bioretention Rain Gardens
Maintenance
Component
Defect Conditions When Maintenance is
Needed
Results Expected When Maintenance is
Performed
Irrigation system
(if any)
Irrigation system present Follow manufacturer’s instructions for
O&M
Plant establishment period (1-3
years)
Water weekly during periods of no rain
to ensure plant establishment
Irrigation
Plant watering
Longer term period (3+ years) Water during drought conditions or more
often if necessary to maintain plant
cover.
Spill prevention Storage or use of potential
contaminants in the vicinity of the
facility.
Exercise spill prevention measures
whenever handling or storing potential
contaminants.
Spill Prevention
and Response
Spill response Release of pollutants. Call to report
any spill to the Washington Dept. of
Emergency Management
1-800-258-5990
Cleanup spills as soon as possible to
prevent contamination of stormwater.
Training and
Documentation
Training/written
guidance
Training/written guidance is required
for proper O&M
Provide property owners and tenants
with proper training and a copy of the
O&M manual and Landscape and
Maintenance Manual.
Safety (slopes) Erosion of sides causes slope to
exceed 1:4 or otherwise become a
hazard.
Take actions to eliminate the hazard.
Safety (hydraulic
structures)
Hydraulic structures (pipes, culverts,
vaults, etc.) become a hazard to
children playing in and around the
facility.
Take actions to eliminate the hazard
(such as covering and securing any
openings).
Safety
Line of sight Vegetation causes some visibility
(line of sight) or driver safety issues.
Prune.
Aesthetics Damage/vandalism/debris
accumulation
Restore facility to original aesthetic
conditions.
Grass/vegetation Less than 75% of planted vegetation
is healthy with a generally good
appearance.
Take appropriate maintenance actions
(e.g. remove/replace plants, amend soil,
etc.)
Aesthetics
Edging Grass is starting to encroach on
swale.
Repair edging.
Mosquitoes Standing water remains in the basin
for more than three days following
storms.
Identify the cause of the standing water
and take appropriate actions to address
the problem (see Bioretention Soil
above)
Pest Control
Rodents Rodent holes are present near the
facility.
Fill and compact the soil around the
holes (refer to Integrated Pest
Management).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 80
No. 21 - Cistern
Maintenance
Component
Defect Conditions When Maintenance Is Needed Results Expected When
Maintenance Is Performed
Roof Debris has accumulated Remove debris
Gutter Debris has accumulated. Clean gutters (the most
critical cleaning is mid- to
late-spring to flush the
pollen deposits from
surrounding trees).
Screen has deteriorated. Replace Screens at the top
of the downspout
and cistern inlet Preventative maintenance Clear screen of any
accumulated debris.
Low flow orifice Preventative maintenance. Clean low flow orifice.
Pipe is damaged. Repair/replace Overflow pipe
Pipe is clogged. Remove debris.
Collection
Facilities
Cistern Debris has accumulated in the bottom of
the tank.
Remove debris.
Training and
Documentation
Training/written
guidance
Training/written guidance is required for
proper O&M.
Provide property owners
and tenants with proper
training and a copy of the
O&M manual.
Safety Access and safety Access to cistern required for maintenance
or cleaning.
Any cistern detention
systems opening that
could allow the entry of
people must be marked:
“DANGER – CONFINED
SPACE”.
Pest Control Mosquitoes Standing water remains for more than three
days following storms.
Ensure cause of standing
water is corrected. Also
ensure all inlets,
overflows, and other
openings are protected
with mosquito screens.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 81
No. 22 – Compost Amended Soil
Maintenance
Component
Defect Conditions When Maintenance
Is Needed
Results Expected When Maintenance Is
Performed
Vegetation not fully covering
ground surface
Re-mulch landscape beds with 2-3 inches of
mulch until the vegetation fully closes over the
ground surface
Return leaf fall and shredded woody materials
from the landscape to the site as mulch.
On turf areas, “grasscycle” ((mulch-mow or
leave the clippings) to build turf health.
Avoid broadcast use of pesticides (bug and
weed killers) like “weed & feed”, which
damage the soil life.
Soil media
(maintain high
organic soil
content) Preventative maintenance
Where fertilization is needed (mainly turf and
annual flower beds), use a moderate
fertilization program that relies on natural
organic fertilizers (like compost) or slow-
release synthetic balanced fertilizers.
Compaction Soils become waterlogged, do
not appear to be infiltrating.
To remediate, aerate soil, till or further amend
soil. If drainage is still slow, consider
investigating alternative causes (e.g. high wet-
season groundwater levels, low-permeability
soils). Also consider land use and protection
from compacting activities. If areas are turf,
aerate compacted areas and top dress them
with ¼ to ½ inch of compost to renovate them.
General
Facility
Requirements
Erosion/scourin
g
Areas of potential erosion are
visible.
Take steps to repair or prevent erosion.
Identify and address the causes of erosion.
Grass/vegetatio
n
Less than 75% of planted
vegetation is healthy with a
generally good appearance.
Take appropriate maintenance actions (e.g.
remove/replace plants).
Noxious weeds Listed noxious vegetation is
present. See Pierce County
noxious weed list.
By law, noxious weeds must be removed and
disposed immediately. Herbicides and
pesticides shall not be used in order to protect
water quality.
General
Facility
Requirements
Weeds Weeds are present. Remove and dispose of weed material.
Herbicides and pesticides shall not be used in
order to protect water quality.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 82
No. 23 – Vegetated Roof
Maintenance
Component
Defect Conditions When Maintenance
Is Needed
Results Expected When Maintenance Is
Performed
Growth medium Water does not permeate
growth media (runs off soil
surface)
Aerate or replace media
Fallen
leaves/debris
Fallen leaves or debris are
present.
Remove/dispose
Soil/Growth
Medium
Erosion/scouring Areas of potential erosion are
visible.
Take steps to repair or prevent erosion.
Stabilize with additional soil substrate/growth
medium and additional plants.
General Structural components are
present.
Inspect structural components for deterioration
or failure. Repair/replace as necessary.
Sediment, vegetation, or
debris blocks 35% or more of
inlet structure
Clear blockage. Identify and correct any
problems that led to blockage.
Inlet pipe is in poor condition. Repair/replace.
System
Structural
Components Inlet pipe
Inlet pipe is clogged. Remove roots or debris.
Coverage Vegetative coverage falls
below 75% (unless design
specifications stipulate less
than 75% coverage).
Install more vegetation.
Noxious weeds Listed noxious vegetation is
present. See Pierce County
noxious weed list.
By law, noxious weeds must be removed and
disposed immediately. Herbicides and
pesticides shall not be used in order to protect
water quality.
Weeds Weeds are present. Remove and dispose of weed material.
Herbicides and pesticides shall not be used in
order to protect water quality.
Vegetation
Plants Dead vegetation is present. Remove dead vegetation when covering
greater than 10% of basin area. Replace dead
vegetation annually or immediately if
necessary to control erosion.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 83
No. 23 – Vegetated Roof
Maintenance
Component
Defect Conditions When Maintenance
Is Needed
Results Expected When Maintenance Is
Performed
Irrigation system
(if any)
Irrigation system present Follow manufacturer’s instructions for O&M.
Plant establishment period
(1-3 years)
Water weekly during periods of no rain to
ensure plant establishment
Irrigation
Plant watering
Longer term period (3+
years)
Water during drought conditions or more often
if necessary to maintain plant cover.
Spill prevention Storage or use of potential
contaminants in the vicinity of
the facility.
Exercise spill prevention measures whenever
handling or storing potential contaminants.
Spill Prevention
and Response
Spill response Release of pollutants. Call to
report any spill to the
Washington Dept. of
Emergency Management
1-800-258-5990
Cleanup spills as soon as possible to prevent
contamination of stormwater.
Training and
Documentation
Training/written
guidance
Training/written guidance is
required for proper O&M.
Provide property owners and tenants with
proper training and a copy of the O&M manual
and Landscape and Maintenance manual.
Safety Access and
Safety
Egress and ingress routes Maintain egress and ingress routes to design
standards and fire codes.
Aesthetics Damage/vandalism/debris
accumulation
Restore facility to original aesthetic conditions. Aesthetics
Grass/vegetation Less than 75% of planted
vegetation is healthy with a
generally good appearance.
Take appropriate maintenance actions (e.g.
remove/replace plants, amend soils, etc.)
Pest Control Mosquitoes Standing water remains for
more than three days
following a storm.
Remove standing water. Identify the cause of
the standing water and take appropriate action
to address the problem (improve drainage).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Maintenance Standards for Volume I
Drainage Facilities Appendix D 84
No. 24 – Pervious Pavement
Maintenance
Component
Defect Conditions When Maintenance Is
Needed
Results Expected When Maintenance
Is Performed
Use conventional street sweepers
equipped with vacuums.
Maintenance to prevent clogging with
fine sediment.
Prohibit use of sand and sealant
application and protect from
construction runoff.
Major cracks or trip hazards Fill with patching mixes. Large cracks
and settlement may require cutting
and replacing the pavement section.
Pervious asphalt
or cement
concrete
Utility cuts Any damage or change due to utility
cuts must be replaced in kind.
Fallen
leaves/debris
Fallen leaves or debris Remove/dispose
Interlocking paving block missing or
damaged.
Replace paver block
Settlement of surface May require resettling
Sediment or debris accumulation
between paver blocks
Remove/dispose
Loss of void material between paver
blocks
Refill per manufacturer’s
recommendations.
Surface
Interlocking
concrete paver
blocks
Varied conditions Perform O&M per manufacturer’s
recommendations.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 85
Appendix E Wetlands and Stormwater Management
Guidelines
As Amended from Chapter 14 of “Wetlands and Urbanization, Implications for the Future,” by Richard
R. Horner, Amanda A. Azous, Klaus O. Richter, Sarah S. Cooke, Lorin E. Reinelt and Kern Ewing
If you are unfamiliar with these guidelines, read the description of the approach and organization that
follows. If you are familiar, proceed directly to the appropriate guide sheet(s) for guidelines covering
your issue(s) or objective(s):
Guide Sheet 1: Comprehensive Landscape Planning for Wetlands and Stormwater
Management
Guide Sheet 2: Wetlands Protection Guidelines
Approach and Organization of the Management Guidelines
Introduction
The Puget Sound Wetlands and Stormwater Management Research Program performed
comprehensive research with the goal of deriving strategies that protect wetland resources in urban
and urbanizing areas, while also benefiting the management of urban stormwater runoff that can
affect those resources. The research primarily involved long-term comparisons of wetland ecosystem
characteristics before and after their watersheds urbanized, and between a set of wetlands that
became affected by urbanization (treatment sites) and a set whose watersheds did not change
(control sites). This work was supplemented by shorter term and more intensive studies of pollutant
transport and fate in wetlands, several laboratory experiments, and ongoing review of relevant work
being performed elsewhere. These research efforts were aimed at defining the types of impacts that
urbanization can cause and the degree to which they develop under different conditions, in order to
identify means of avoiding or minimizing impacts that impair wetland structure and functioning. The
program's scope embraced both situations where urban drainage incidentally affects wetlands in its
path, as well as those in which direct stormwater management actions change wetlands' hydrology,
water quality or both.
This document presents preliminary management guidelines for urban wetlands and their stormwater
discharges based on the research results. The set of guidelines is the principal vehicle to implement
the research findings in environmental planning and management practice.
Guidelines Scope and Underlying Principles.
NOTE: For terms in boldface type see item 1 under Support Materials.
1. These provisions currently have the status of guidelines rather than requirements.
Application of these guidelines does not fulfill assessment and permitting requirements that
may be associated with a project. It is, in general, necessary to follow the stipulations of the
State Environmental Policy Act and to contact such agencies as the local planning agency;
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 86
the Washington Departments of Ecology, Fisheries, and Wildlife; the U. S. Environmental
Protection Agency; and the U. S. Army Corps of Engineers.
2. Using the guidelines should be approached from a problem-solving viewpoint. The
“problem” is regarded to be accomplishing one or more particular planning or management
objectives involving a wetland potentially or presently affected by stormwater drainage from
an urban or urbanizing area. The objectives can be broad, specific, or both. Broad
objectives involve comprehensive planning and subsequent management of a drainage
catchment or other landscape unit containing one or more wetlands. Specific objectives
pertain to managing a wetland having particular attributes to be sustained. Of course, the
prospect for success is greater with ability to manage the whole landscape influencing the
wetland, rather than just the wetland itself.
3. The guidelines are framed from the standpoint that some change in the landscape has the
potential to modify the physical and chemical structure of the wetland environment, which
in turn could alter biological communities and the wetland’s ecological functions. The
general objective in this framework would be to avoid or minimize negative ecological
change. This view is in contrast to one in which a wetland has at some time in the past
experienced negative change, and consequent ecological degradation, and where the
general objective would be to recover some or all of the lost structure and functioning
through enhancement or restoration actions. Direct attention to this problem was outside
the scope of the Puget Sound Wetlands and Stormwater Management Research Program.
However, the guidelines do give information that applies to enhancement and restoration.
For example, attempted restoration of a diverse amphibian community would not be
successful if the water level fluctuation limits consistent with high amphibian species
richness are not observed.
4. The guidelines can be applied with whatever information concerning the problem is
available. Of course, the comprehensiveness and certainty of the outcome will vary with the
amount and quality of information employed. The guidelines can be applied in an iterative
fashion to improve management understanding as the information improves. Wetlands
Guidance Appendix 1 lists the information needed to perform basic analyses, followed by
other information that can improve the understanding and analysis.
5. These guidelines emphasize avoiding structural, hydrologic, and water quality
modifications of existing wetlands to the extent possible in the process of urbanization and
the management of urban stormwater runoff.
6. In pursuit of this goal, the guidelines take a systematic approach to management problems
that potentially involve both urban stormwater (quantity, quality, or both) and wetlands. The
consideration of wetlands involves their area extent, values, and functions. This approach
emphasizes a comprehensive analysis of alternatives to solve the identified problem. The
guidelines encourage conducting the analysis on a landscape scale and considering all of
the possible stormwater management alternatives, which may or may not involve a wetland.
They favor source control best management practices (BMPs) and pre-treatment of
stormwater runoff prior to release to wetlands.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 87
7. Furthermore, the guidelines take a holistic view of managing wetland resources in an urban
setting. Thus, they recognize that urban wetlands have the potential to be affected
structurally and functionally whether or not they are formally designated for stormwater
management purposes. Even if an urban wetland is not structurally or hydrologically
engineered for such purposes, it may experience altered hydrology (more or less water),
reduced water quality, and a host of other impacts related to urban conditions. It is the
objective of the guidelines to avoid or reduce the negative effects on wetland resources from
both specific stormwater management actions and incidental urban impacts.
Support Materials
1. The guidelines use certain terms that require definition to ensure that the intended meaning
is conveyed to all users. Such terms are printed in boldface the first time that they appear in
each guide sheet, and are defined in Wetlands Guidance Appendix B.
2. The guideline provisions were drawn principally from the available results of the Puget
Sound Wetlands and Stormwater Management Research Program, as set forth in Sections
2 and 3 of the program’s summary publication, Wetlands and Urbanization, Implications for
the Future (Horner et al. 1996). Where the results in this publication are the basis for a
numerical provision, a separate reference is not given. Numerical provisions based on other
sources are referenced. See Wetlands Guidance References at the end of this appendix.
3. Appendix 3 presents a list of plant species native to wetlands in the Puget Sound Region.
This appendix is intended for reference by guideline users who are not specialists in wetland
botany. However, non-specialists should obtain expert advice when making decisions
involving vegetation.
4. Appendix 4 compares the water chemistry characteristics of Sphagnum bog and fen
wetlands (termed priority peat wetlands in these guidelines) with more common wetland
communities. These bogs and fens appear to be the most sensitive among the Puget Sound
lowland wetlands to alteration of water chemistry, and require special water quality
management to avoid losses of their relatively rare communities.
Guide Sheet 1: Comprehensive Landscape Planning for Wetlands and
Stormwater Management
Wetlands in newly developing areas will receive urban effects even if not specifically "used" in
stormwater management. Therefore, the task is proper overall management of the resources and
protection of their general functioning, including their role in storm drainage systems. Stormwater
management in newly developing areas is distinguished from management in already developed
locations by the existence of many more feasible stormwater control options prior to development.
The guidelines emphasize appropriate selection among the options to achieve optimum overall
resource protection benefits, extending to downstream receiving waters and ground water aquifers,
as well as to wetlands.
The comprehensive planning guidelines are based on two principles that are recognized to create the
most effective environmental management: (1) the best management policies for the protection of
wetlands and other natural resources are those that prevent or minimize the development of impacts
at potential sources; and (2) the best management strategies are self-perpetuating, that is they do not
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 88
require periodic infusions of capital and labor. To apply these principles in managing wetlands in a
newly developing area, carry out the following steps.
Guide Sheet 1A: Comprehensive Planning Steps
1. Define the landscape unit subject to comprehensive planning. Refer to the definition of
landscape unit in Appendix 2 for assistance in defining it.
2. Begin the development of a plan for the landscape unit with attention to the following
general principles:
• Formulate the plan on the basis of clearly articulated community goals. Carefully
identify conflicts and choices between retaining and protecting desired resources and
community growth.
• Map and assess land suitability for urban uses. Include the following landscape
features in the assessment: forested land, open unforested land, steep slopes,
erosion-prone soils, foundation suitability, soil suitability for waste disposal, aquifers,
aquifer recharge areas, wetlands, floodplains, surface waters, agricultural lands, and
various categories of urban land use. When appropriate, the assessment can
highlight outstanding local or regional resources that the community determines
should be protected (e. g., a fish run, scenic area, recreational area, threatened
species habitat, farmland). Mapping and assessment should recognize not only
these resources but also additional areas needed for their sustenance.
3. Maximize natural water storage and infiltration opportunities within the landscape unit and
outside of existing wetlands, especially:
• Promote the conservation of forest cover. Building on land that is already deforested
affects basin hydrology to a lesser extent than converting forested land. Loss of forest
cover reduces interception storage, detention in the organic forest floor layer, and water
losses by evapotranspiration, resulting in large peak runoff increases and either their
negative effects or the expense of countering them with structural solutions.
• Maintain natural storage reservoirs and drainage corridors, including depressions, areas
of permeable soils, swales, and intermittent streams. Develop and implement policies
and regulations to discourage the clearing, filling, and channelization of these features.
Utilize them in drainage networks in preference to pipes, culverts, and engineered
ditches.
• In evaluating infiltration opportunities refer to the stormwater management manual for
the jurisdiction and pay particular attention to the selection criteria for avoiding
groundwater contamination and poor soils and hydrogeological conditions that cause
these facilities to fail. If necessary, locate developments with large amounts of
impervious surfaces or a potential to produce relatively contaminated runoff away from
groundwater recharge areas. Relatively dense developments on glacial outwash soils
may require additional runoff treatment to protect groundwater quality.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 89
4. Establish and maintain buffers surrounding wetlands and in riparian zones as required by
local regulations or recommended by the Puget Sound Water Quality Authority's wetland
guidelines. Also, maintain interconnections among wetlands and other natural habitats to
allow for wildlife movements.
5. Determine whether the wetland has a breeding, native amphibian population. A survey
should be conducted in the spring.
6. Take specific management measures to avoid general urban impacts on wetlands and other
water bodies (e. g., littering, vegetation destruction, human and pet intrusion harmful to
wildlife).
7. To support management of runoff water quantity, perform a hydrologic analysis of the
contributing drainage catchment to define the type and extent of flooding and stream
channel erosion problems associated with existing development, redevelopment, or new
development that require control to protect the beneficial uses of receiving waters, including
wetlands. This analysis should include assembly of existing flow data and hydrologic
modeling as necessary to establish conditions limiting to attainment of beneficial uses.
Modeling should be performed as directed by the stormwater management manual in effect
in the jurisdiction.
8. In wetlands previously relatively unaffected by human activities, manage stormwater
quantity to attempt to match the pre-development hydroperiod and hydrodynamics. In
wetlands whose hydrology has been disturbed, consider ways of reducing hydrologic
impacts. This provision involves not only management of high runoff volumes and rates of
flow during the wet season, but also prevention of water supply depletion during the dry
season. The latter guideline may require flow augmentation if urbanization reduces existing
surface or groundwater inflows. Refer to Guide Sheet 2, Wetland Protection Guidelines, for
detail on implementing these guidelines.
9. Assess alternatives for the control of runoff water quantities as follows:
a. Define the runoff quantity problem subject to management by analyzing the proposed
land development action.
b. For existing development or redevelopment, assess possible alternative solutions that
are applicable at the site of the problem occurrence, including:
– Protect health, safety, and property from flooding by removing habitation from the
flood plain.
– Prevent stream channel erosion by stabilizing the eroding bed and/or bank area with
bioengineering techniques, preferably, or by structurally reinforcing it, if this solution
would be consistent with the protection of aquatic habitats and beneficial uses of the
stream (refer to Chapter 173-201A of the Washington Administrative Code (WAC) for
the definition of beneficial uses).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 90
c. For new development or redevelopment, assess possible regulatory and incentive land
use control alternatives, such as density controls, clearing limits, impervious surface
limits, transfer of development rights, purchase of conservation areas, etc.
d. If the alternatives considered in Steps 9a or 9b cannot solve an existing or potential
problem, perform an analysis of the contributing drainage catchment to assess possible
alternative solutions that can be applied on-site or on a regional scale. The most
appropriate solution or combination of alternatives should be selected with regard to the
specific opportunities and constraints existing in the drainage catchment. For new
development or redevelopment, on-site facilities that should be assessed include, in
approximate order of preference:
– Infiltration basins or trenches;
– Retention/detention ponds;
– Below-ground vault or tank storage;
– Parking lot detention.
Regional facilities that should be assessed for solving problems associated with new
development, redevelopment, or existing development include:
– Infiltration basins or trenches;
– Detention ponds;
– Constructed wetlands;
– Bypassing a portion of the flow to an acceptable receiving water body, with treatment
as required to protect water quality and other special precautions as necessary to
prevent downstream impacts.
e. Consider structurally or hydrologically engineering an existing wetland for water quantity
control only if upland alternatives are inadequate to solve the existing or potential
problem. To evaluate the possibility, refer to the Storm-water Wetland Assessment
Criteria in Guide Sheet 1B.
10. Place strong emphasis on water resource protection during construction of new
development. Establish effective erosion control programs to reduce the sediment loadings
to receiving waters to the maximum extent possible. No preexisting wetland or other water
body should ever be used for the sedimentation of solids in construction-phase runoff.
11. In wetlands previously relatively unaffected by human activities, manage stormwater quality
to attempt to match pre-development water quality conditions. To support management of
runoff water quality, perform an analysis of the contributing drainage catchment to define the
type and extent of runoff water quality problems associated with existing development,
redevelopment, or new development that require control to protect the beneficial uses of
receiving waters, including wetlands. This analysis should incorporate the hydrologic
assessment performed under step 7 and include identification of key water pollutants, which
may include solids, oxygen-demanding substances, nutrients, metals, oils, trace organics,
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 91
and bacteria, and evaluation of the potential effects of water pollutants throughout the
drainage system.
12. Assess alternatives for the control of runoff water quality as follows:
a. Perform an analysis of the contributing drainage catchment to assess possible
alternative solutions that can be applied on-site or on a regional scale. The most
appropriate solution or combination of alternatives should be selected with regard to the
specific opportunities and constraints existing in the drainage catchment. Consider both
source control BMPs and treatment BMPs as alternative solutions before considering
use of existing wetlands for quality improvement according to the following
considerations:
– Implementation of source control BMPs prevent the generation or release of
water pollutants at potential sources. These alternatives are generally both more
effective and less expensive than treatment controls. They should be applied to
the maximum extent possible to new development, redevelopment, and existing
development.
– Treatment BMPs capture water pollutants after their release. This alternative
often has limited application in existing developments because of space
limitations, although it can be employed in new development and when
redevelopment occurs in already developed areas. Refer to Minimum
Requirement #6 in Volume 1 of the Stormwater Management Manual for Western
Washington to determine whether a treatment facility is necessary for your site. If
a facility is required, refer to Chapter 4 of Volume I, or Chapter 2 of Volume V to
determine which treatment requirement – basic, enhanced, phosphorus, or oil
control - applies to your site. Then refer to the corresponding BMP menu for that
requirement in Chapter 3 of Volume V. From the menu select a BMP that fits with
your project site.
b. Consider structurally or hydrologically engineering an existing wetland for water quality
control only if upland alternatives are inadequate to solve the existing or potential
problem. Use of Waters of the State and Waters of the United States, including
wetlands, for the treatment or conveyance of wastewater, including stormwater, is
prohibited under state and federal law. Discussions with federal and state regulators
during the research program led to development of a statement concerning the use of
existing wetlands for improving stormwater quality (polishing), as follows. Such use is
subject to analysis on a case-by-case basis and may be allowed only if the following
conditions are met:
– If restoration or enhancement of a previously degraded wetland is required,
and if the upgrading of other wetland functions can be accomplished along with
benefiting runoff quality control, and
– If appropriate source control and treatment BMPs are applied in the contributing
catchment on the basis of the analysis in Step 12a, and any legally adopted
water quality standards for wetlands are observed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 92
If these circumstances apply, refer to the Stormwater Wetland Assessment Criteria in
Guide Sheet 1B to evaluate further.
13. Stimulate public awareness of and interest in wetlands and other water resources in order to
establish protective attitudes in the community. This program should include:
• Education regarding the use of fertilizers and pesticides, automobile maintenance,
the care of animals to prevent water pollution, and the importance of retaining
buffers;
• Descriptive signboards adjacent to wetlands informing residents of the wetland type,
its functions, the protective measures being taken, etc.
• If beavers are present in a wetland, educate residents about their ecological role and
value and take steps to avoid human interference with beavers.
Guide Sheet 1B: Stormwater Wetland Assessment Criteria
This guide sheet gives criteria that disqualify a natural wetland from being structurally or
hydrologically engineered for control of stormwater quantity, quality, or both. These criteria should be
applied only after performing the alternatives analysis outlined in Guide Sheet 1A.
1. A wetland should not be structurally or hydrologically engineered for runoff quantity or
quality control and should be given maximum protection from overall urban impacts (see
Guide Sheet 2, Wetland Protection Guidelines) under any of the following circumstances:
• In its present state it is primarily an estuarine or forested wetland or a priority peat
system.
• It is a rare or irreplaceable wetland type, as identified by the Washington Natural
Heritage Program, the Puget Sound Water Quality Preservation Program, or local
government.
• It provides rare, threatened, or endangered species habitat that could be impaired
by the proposed action. Determining whether or not the conserved species will be
affected by the proposed project requires a careful analysis of its requirements in
relation to the anticipated habitat changes.
In general, the wetlands in these groups are classified in Categories I and II in the Puget
Sound Water Quality Authority's draft wetland guidelines.
2. A wetland can be considered for structural or hydrological modification for runoff quantity or
quality control if most of the following circumstances exist:
• It is classified in Category IV in the Puget Sound Water Quality Authority's draft
wetland guidelines. In general, Category IV wetlands have monotypic vegetation of
similar age and class, lack special habitat features, and are isolated from other
aquatic systems.
• The wetland has been previously disturbed by human activity, as evidenced by
agriculture, fill, ditching, and/or introduced or invasive weedy plant species.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 93
• The wetland has been deprived of a significant amount of its water supply by
draining or previous urbanization (e. g., by loss of groundwater supply), and
stormwater runoff is sufficient to augment the water supply. A particular candidate is
a wetland that has experienced an increased summer dry period, especially if the
drought has been extended by more than two weeks.
• Construction for structural or hydrologic modification in order to provide runoff
quantity or quality control will disturb relatively little of the wetland.
• The wetland can provide the required storage capacity for quantity or quality control
through an outlet orifice modification to increase storage of water, rather than
through raising the existing overflow. Orifice modification is likely to require less
construction activity and consequent negative impacts.
• Under existing conditions the wetland's experiences a relatively high degree of water
level fluctuation and a range of velocities (i.e., a wetland associated with
substantially flowing water, rather than one in the headwaters or entirely isolated
from flowing water).
• The wetland does not exhibit any of the following features:
- Significant priority peat system or forested zones that will experience substantially
altered hydroperiod as a result of the proposed action;
- Regionally unusual biological community types;
- Animal habitat features of relatively high value in the region (e. g., a protected,
undisturbed area connected through undisturbed corridors to other valuable habitats,
an important breeding site for protected species);
- The presence of protected commercial or sport fish;
- Configuration and topography that will require significant modification that may
threaten fish stranding;
- A relatively high degree of public interest as a result of, for example, offering valued
local open space or educational, scientific, or recreational opportunities, unless the
proposed action would enhance these opportunities;
• The wetland is threatened by potential impacts exclusive of stormwater management,
and could receive greater protection if acquired for a stormwater management project
rather than left in existing ownership.
• There is good evidence that the wetland actually can be restored or enhanced to
perform other functions in addition to runoff quantity or quality control.
• There is good evidence that the wetland lends itself to the effective application of the
Wetland Protection Guidelines in Guide Sheet 2.
• The wetland lies in the natural routing of the runoff. Local regulations often prohibit
drainage diversion from one basin to another.
• The wetland allows runoff discharge at the natural location.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 94
Guide Sheet 2: Wetland Protection Guidelines
This guide sheet provides information about likely changes to the ecological structure and
functioning of wetlands that are incidentally subject to the effects of an urban or urbanizing
watershed or are modified to supply runoff water quantity or quality control benefits. The guide sheet
also recommends management actions that can avoid or minimize deleterious changes in these
wetlands.
Guide Sheet 2A: General Wetland Protection Guidelines
1. Consult regulations issued under federal and state laws that govern the discharge of
pollutants. Wetlands are classified as "Waters of the United States" and "Waters of the
State" in Washington.
2. Maintain the wetland buffer required by local regulations or recommended by the Puget
Sound Water Quality Authority's draft wetland guidelines.
3. Retain areas of native vegetation connecting the wetland and its buffer with nearby wetlands
and other contiguous areas of native vegetation.
4. Avoid compaction of soil and introduction of exotic plant species during any work in a
wetland.
5. Take specific site design and maintenance measures to avoid general urban impacts (e. g.,
littering and vegetation destruction). Examples are protecting existing buffer zones;
discouraging access, especially by vehicles, by plantings outside the wetland; and
encouragement of stewardship by a homeowners' association. Fences can be useful to
restrict dogs and pedestrian access, but they also interfere with wildlife movements. Their
use should be very carefully evaluated on the basis of the relative importance of intrusive
impacts versus wildlife presence. Fences should generally not be installed when wildlife
would be restricted and intrusion is relatively minor. They generally should be used when
wildlife passage is not a major issue and the potential for intrusive impacts is high. When
wildlife movements and intrusion are both issues, the circumstances will have to be weighed
to make a decision about fencing.
6. If the wetland inlet will be modified for the stormwater management project, use a diffuse
flow method, such as a spreader swale, to discharge water into the wetland in order to
prevent flow channelization.
Guide Sheet 2B: Guidelines for Protection from Adverse Impacts of Modified Runoff
Quantity Discharged to Wetlands
1. Protection of wetland plant and animal communities depends on controlling the wetland’s
hydroperiod, meaning the pattern of fluctuation of water depth and the frequency and
duration of exceeding certain levels, including the length and onset of drying in the summer.
A hydrologic assessment is useful to measure or estimate elements of the hydroperiod
under existing pre-development and anticipated post-development conditions. This
assessment should be performed with the aid of a qualified hydrologist. Post-development
estimates of watershed hydrology and wetland hydroperiod must include the cumulative
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 95
effect of all anticipated watershed and wetland modifications. Provisions in these guidelines
pertain to the full anticipated build-out of the wetland’s watershed.
This analysis hypothesizes a fluctuating water stage over time before development that
could fluctuate more, both higher and lower after development; these greater fluctuations
are termed stage excursions. The guidelines set limits on the frequency and duration of
excursions, as well as on overall water level fluctuation, after development.
To determine existing hydroperiod use one of the following methods, listed in order of
preference:
• Estimation by a continuous simulation computer model--The model should be
calibrated with at least one year of data taken using a continuously recording level
gage under existing conditions and should be run for the historical rainfall period.
The resulting data can be used to express the magnitudes of depth fluctuation, as
well as the frequencies and durations of surpassing given depths. [Note: Modeling
that yields high quality information of the type needed for wetland hydroperiod
analysis is a complex subject. Providing guidance on selecting and applying
modeling options is beyond the scope of these guidelines but is being developed by
King County Surface Water Management Division and other local jurisdictions. An
alternative possibility to modeling depths, frequencies, and durations within the
wetland is to model durations above given discharge levels entering the wetland over
various time periods (e. g., seasonal, monthly, weekly). This option requires further
development.]
• Measurement during a series of time intervals (no longer than one month in length)
over a period of at least one year of the maximum water stage, using a crest stage
gage, and instantaneous water stage, using a staff gage--The resulting data can be
used to express water level fluctuation (WLF) during the interval as follows:
Average base stage = (Instantaneous stage at beginning of interval + Instantaneous
stage at end of interval)/2
WLF = Crest stage - Average base stage
Compute mean annual and mean monthly WLF as the arithmetic averages for each year
and month for which data are available.
To forecast future hydroperiod use one of the following methods, listed in order of
preference:
• Estimation by the continuous simulation computer model calibrated during pre-
development analysis and run for the historical rainfall period--The resulting data can
be used to express the magnitudes of depth fluctuation, as well as the frequencies
and durations of surpassing given depths. [Note: Post-development modeling results
should generally be compared with pre-development modeling results, rather than
directly with field measurements, because different sets of assumptions underlie
modeling and monitoring. Making pre- and post-development comparisons on the
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 96
basis of common assumptions allows cancellation of errors inherent in the
assumptions.]
• Estimation according to general relationships developed from the Puget Sound
Wetlands and Stormwater Management Program Research Program, as follows (in
part adapted from Chin 1996):
- Mean annual WLF is very likely (100% of cases measured) to be < 20 cm (8 inches
or 0.7 ft) if total impervious area (TIA) cover in the watershed is < 6% (roughly
corresponding to no more than 15% of the watershed converted to urban land use).
- Mean annual WLF is very likely (89% of cases measured) to be > 20 cm if TIA in the
watershed is > 21% (roughly corresponding to more than 30% of the watershed
converted to urban land use).
- Mean annual WLF is somewhat likely (50% of cases measured) to be > 30 cm
(1.0 ft) if TIA in the watershed is > 21% (roughly corresponding to more than 30% of
the watershed converted to urban land use).
- Mean annual WLF is likely (75% of cases measured) to be > 30 cm, and somewhat
likely (50% of cases measured) to be 50 cm (20 inches or 1.6 ft) or higher, if TIA in
the watershed is > 40% (roughly corresponding to more than 70% of the watershed
converted to urban land use).
- The frequency of stage excursions greater than 15 cm (6 inches or 0.5 ft) above or
below pre-development levels is somewhat likely (54% of cases measured) to be
more than six per year if the mean annual WLF increases to > 24 cm (9.5 inches or
0.8 ft).
- The average duration of stage excursions greater than 15 cm above or below pre-
development levels is likely (69% of cases measured) to be more than 72 hours if the
mean annual WLF increases to > 20 cm.
2. The following hydroperiod limits characterize wetlands with relatively high vegetation
species richness and apply to all zones within all wetlands over the entire year. If these
limits are exceeded, then species richness is likely to decline. If the analysis described
above forecasts exceedences, one or more of the management strategies listed in step 5
should be employed to attempt to stay within the limits.
• Mean annual WLF (and mean monthly WLF for every month of the year) does not
exceed 20 cm. Vegetation species richness decrease is likely with: (1) a mean
annual (and mean monthly) WLF increase of more than 5 cm (2 inches or 0.16 ft) if
pre-development mean annual (and mean monthly) WLF is greater than 15 cm, or
(2) a mean annual (and mean monthly) WLF increase to 20 cm or more if pre-
development mean annual (and mean monthly) WLF is 15 cm or less.
• The frequency of stage excursions of 15 cm above or below pre-development stage
does not exceed an annual average of six. Note: A short-term lagging or
advancement of the continuous record of water levels is acceptable. The 15 cm limit
applies to the temporary increase in maximum water surface elevations (hydrograph
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 97
peaks) after storm events and the maximum decrease in water surface elevations
(hydrograph valley bottoms) between events and during the dry season.
• The duration of stage excursions of 15 cm above or below pre-development stage
does not exceed 72 hours per excursion. Note: A short-term lagging or
advancement of the continuous record of water levels is acceptable. However, the 15
cm limit applies throughout the entire hydrograph, not just the peaks and valleys.
• The total dry period (when pools dry down to the soil surface everywhere in the
wetland) does not increase or decrease by more than two weeks in any year.
• Alterations to watershed and wetland hydrology that may cause perennial wetlands
to become vernal are avoided.
3. The following hydroperiod limit characterizes priority peat wetlands (bogs and fens as
more specifically defined by the Washington Department of Ecology) and applies to all
zones over the entire year. If this limit is exceeded, then characteristic bog or fen wetland
vegetation is likely to decline. If the analysis described above forecasts exceedance, one or
more of the management strategies listed in step 5 should be employed to attempt to stay
within the limit.
• The duration of stage excursions above the pre-development stage does not exceed
24 hours in any year.
NOTE: This guideline is in addition to the guidelines in #2 directly above. To apply this
guideline a continuous simulation computer model needs to be employed. The model should
be calibrated with data taken under existing conditions at the wetland being analyzed and
then used to forecast post-development duration of excursions.
4. The following hydroperiod limits characterize wetlands inhabited by breeding native
amphibians and apply to breeding zones during the period 1 February through 31 May. If
these limits are exceeded, then amphibian breeding success is likely to decline. If the
analysis described above forecasts exceedences, one or more of the management
strategies listed in step 5 should be employed to attempt to stay within the limits.
• The magnitude of stage excursions above or below the pre-development stage
should not exceed 8 cm for more than 24 hours in any 30-day period.
NOTE: To apply this guideline a continuous simulation computer model needs to be
employed. The model should be calibrated with data taken under existing conditions at the
wetland being analyzed and then used to forecast post-development magnitude and duration
of excursions.
5. If it is expected that the hydroperiod limits stated above could be exceeded, consider
strategies such as:
• Reduction of the level of development;
• Increasing runoff infiltration
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 98
NOTE: Infiltration is prone to failure in many Puget Sound Basin locations with glacial till soils
and generally requires pretreatment to avoid clogging. In other situations infiltrating urban
runoff may contaminate groundwater. Consult the stormwater management manual adopted
by the jurisdiction and carefully analyze infiltration according to its prescriptions.
• Increasing runoff storage capacity; and
• Selective runoff bypass.
6. After development, monitor hydroperiod with a continuously recording level gauge or staff
and crest stage gauges. If the applicable limits are exceeded, consider additional
applications of the strategies in step 5 that may still be available. It is also recommended
that goals be established to maintain key vegetation species, amphibians, or both, and that
these species be monitored to determine if the goals are being met.
Guide Sheet 2C: Guidelines for Protection from Adverse Impacts of Modified Runoff
Quality Discharged to Wetlands
1. Require effective erosion control at any construction sites in the wetland's drainage
catchment.
2. Institute a program of source control BMPs to minimize the generation of pollutants that
will enter storm runoff that drains to the wetland.
3. Provide a water quality control facility consisting of one or more treatment BMPs to treat all
urban runoff entering the wetland. Refer to Chapter 4 of Volume 1 or Chapter 2 of Volume 5
of the Stormwater Management Manual for Western Washington to determine treatment
requirements. Then refer to the corresponding BMP menu for that requirement in Chapter 3
of Volume V. From the menu select a BMP that fits with the project site.
• If the wetland is a priority peat wetland (bogs and fens as more specifically defined
by the Washington Department of Ecology), the facility should include a BMP with
the most advanced ability to control nutrients (e. g., an infiltration device, a wet pond
or constructed wetland with residence time in the pooled storage of at least two
weeks). [Note: Infiltration is prone to failure in many Puget Sound Basin locations
with glacial till soils and generally requires pretreatment to avoid clogging. In other
situations infiltrating urban runoff may contaminate groundwater. Consult the
stormwater management manual adopted by the jurisdiction and carefully analyze
infiltration according to its prescriptions.] Refer to Appendix 4 for a comparison of
water chemistry conditions in priority peat versus more typical wetlands.
Refer to the stormwater management manual to select and design the facility. Generally, the
facility should be located outside and upstream of the wetland and its buffer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 99
4. Design and perform a water quality monitoring program for priority peat wetlands and for
other wetlands subject to relatively high water pollutant loadings. The research results
(Horner 1989) identified such wetlands as having contributing catchments exhibiting either
of the following characteristics:
• More than 20 percent of the catchment area is committed to commercial, industrial,
and/or multiple family residential land uses; or
• The combination of all urban land uses (including single family residential) exceeds
30 percent of the catchment area.
A recommended monitoring program, consistent with monitoring during the research
program, is:
• Perform pre-development baseline sampling by collecting water quality grab
samples in an open water pool of the wetland for at least one year, allocated through
the year as follows: November 1-March 31--4 samples, April 1-May 31--1 sample,
June 1-August 31--2 samples, and September 1-October 31--1 sample (if the
wetland is dry during any period, reallocate the sample(s) scheduled then to another
time). Analyze samples for pH; dissolved oxygen (DO); conductivity (Cond); total
suspended solids (TSS); total phosphorus (TP); nitrate + nitrite-nitrogen (N); fecal
coliforms (FC); and total copper (Cu), lead (Pb), and zinc (Zn). Find the median and
range of each water quality variable.
• Considering the baseline results, set water quality goals to be maintained in the post-
development period. Example goals are: (1) pH--no more than “x” percent (e. g.,
10%) increase (relative to baseline) in annual median and maximum or decrease in
annual minimum; (2) DO--no more than “x” percent decrease in annual median and
minimum concentrations; (3) other variables --no more than “x” percent increase in
annual median and maximum concentrations; (4) no increase in violations of the
Washington Administrative Code (WAC) water quality criteria.
• Repeat the sampling on the same schedule for at least one year after all
development is complete. Compare the results to the set goals.
If the water quality goals are not met, consider additional applications of the source and
treatment controls described in steps 2 and 3. Continue monitoring until the goals are
met at least two years in succession.
NOTE: Wetland water quality was found to be highly variable during the research, a fact
that should be reflected in goals. Using the maximum (or minimum), as well as a
measure of central tendency like the median, and allowing some change from pre-
development levels are ways of incorporating an allowance for variability. Table I-E-2
presents data from the wetlands studied during the research program to give an
approximate idea of magnitudes and degree of variability to be expected. Non-urbanized
watersheds (N) are those that have both < 15% urbanization and < 6% impervious
cover. Highly urbanized watersheds (H) are those that have both lost all forest cover and
have > 20% impervious cover. Moderately urbanized watersheds (M) are those that fit
neither the N nor H category.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 100
Table I-E-2. Water Quality Ranges Found in Study Wetlands
N M H
Metric Median Mean Std.Dev./na Median Mean Std.Dev./na Median Mean Dev./na
pHb 6.4 6.4 0.5/162 6.7 6.5 0.8/132 6.9 6.7 0.6/52
DO (mg/L) 5.9 5.7 2.6/205 5.1 5.53.6/173 6.3 5.4 2.9/67
Cond. (S/cm) 46 73 64/190 160 142 73/161 132 151 86/61
TSS (g/L) 2.0 4.6 8.5/204 2.8 9.2 22/175 4.0 9.2 15/66
TP (g/L) 29 52 87/206 70 93 92/177 69 110 234/67
N (g/L) 112 368 485/206 304 598 847/177 376 395 239/67
FC (no./100mL) 9.0 271 1000/206 46 2665 27342/173 61 969 4753/66
Cu (g/L) <5.0 <3.3 >2.7/93 <5.0 <3.7 >1.9/78 <5.0 <4.1 <2.5/29
Pb (g/L) 1.0 <2.7 >2.8/136 3.0 <3.4 >2.7/122 5.0 <4.5 >4.0/44
Zn (g/L) 5.0 8.4 8.3/136 8.0 9.8 7.2/122 20 20 17/44
a Std. Dev.--standard deviation; n--number of observations. b Values do not apply to priority peat wetlands. The program did not specifically study these wetlands but measured
pH in three wetlands with “bog-like” characteristics. The minimum value measured in these wetlands was 4.5, and
the lowest median was 4.8; but pH can be approximately 1 unit lower in wetlands of this type.
Guide Sheet 2D: Guidelines for the Protection of Specific Biological Communities
1. For wetlands inhabited by breeding native amphibians:
• Refer to step 4 of Guide Sheet 2B for hydroperiod limit.
• Avoid decreasing the sizes of the open water and aquatic bed zones.
• Avoid increasing the channelization of flow. Do not form channels where none exist,
and take care that inflows to the wetland do not become more concentrated and do
not enter at higher velocities than accustomed. If necessary, concentrated flows can
be uniformly distributed with a flow-spreading device such as a shallow weir, stilling
basin, or perforated pipe. Velocity dissipation can be accomplished with a stilling
basin or rip-rap pad.
• Limit the post-development flow velocity to < 5 cm/s (0.16 ft/second) in any location
that had a velocity in the range 0-5 cm/s in the pre-development condition.
• Avoid increasing the gradient of wetland side slopes.
2. For wetlands inhabited by forest bird species:
• Retain areas of coniferous forest in and around the wetland as habitat for forest
species.
• Retain shrub or woody debris as nesting sites for ground-nesting birds and downed
logs and stumps for winter wren habitat.
• Retain snags as habitat for cavity-nesting species, such as woodpeckers.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 101
• Retain shrubs in and around the wetland for protective cover. If cover is insufficient
to protect against domestic pet predation, consider planting native bushes such as
rose species in the buffer.
3. For wetlands inhabited by wetland obligate bird species:
• Retain forested zones, sedge and rush meadows, and deep open water zones, both
without vegetation and with submerged and floating plants.
• Retain shrubs in and around the wetland for protective cover. If cover is insufficient
to protect against domestic pet predation, consider planting native bushes such as
rose species in the buffer.
• Avoid introducing invasive weedy plant species, such as purple loosestrife and
reed canary grass.
• Retain the buffer zone. If it has lost width or forest cover, consider re-establishing
forested buffer area at least 30 meters (100 ft) wide.
• If human entry is desired, establish paths that permit people to observe the wetland
with minimum disturbance to the birds.
4. For wetlands inhabited by fish:
• Protect fish habitats by avoiding water velocities above tolerated levels (selected with
the aid of a qualified fishery biologist to protect fish in each life stage when they are
present), siltation of spawning beds, etc. Habitat requirements vary substantially
among fish species. If the wetland is associated with a larger water body, contact the
Department of Fisheries and Wildlife to determine the species of concern and the
acceptable ranges of habitat variables.
• If stranding of protected commercial or sport fish could result from a structural or
hydrologic modification for runoff quantity or quality control, develop a strategy to
avoid stranding that minimizes disturbance in the wetland (e. g., by making
provisions for fish return to the stream as the wetland drains, or avoiding use of the
facility for quantity or quality control during fish presence).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 102
Wetlands Guidance Appendix 1:
Information Needed to Apply Guidelines
The following information listed for each guide sheet is most essential for applying the Wetlands and
Stormwater Management Guidelines. As a start, obtain the relevant soil survey; the National Wetland
Inventory, topographic and land use maps, and the results of any local wetland inventory.
Guide Sheet 1
1. Boundary and area of the contributing watershed of the wetland or other landscape unit
2. A complete definition of goals for the wetland and landscape unit subject to planning and
management
3. Existing management and monitoring plans
4. Existing and projected land use in the landscape unit in the categories commercial,
industrial, multi-family residential, single-family residential, agricultural, various categories of
undeveloped, and areas subject to active logging or construction (expressed as percentages
of the total watershed area)
5. Drainage network throughout the landscape unit
6. Soil conditions, including soil types, infiltration rates, and positions of seasonal water table
(seasonally) and restrictive layers
7. Groundwater recharge and discharge points
8. Wetland category (I - IV in draft Puget Sound Water Quality Authority wetland protection
guidelines); designation as rare or irreplaceable. Refer to the Washington Natural Heritage
Program database. If the needed information is not available, a biological assessment will
be necessary.
9. Watershed hydrologic assessment
10. Watershed water quality assessment
11. Wetland type and zones present, with special note of estuarine, priority peat system,
forested, sensitive scrub-shrub zone, sensitive emergent zone and other sensitive or critical
areas designated by state or local government (with dominant plant species)
12. Rare, threatened, or endangered species inhabiting the wetland
13. History of wetland changes
14. Relationship of wetland to other water bodies in the landscape unit and the drainage
network
15. Flow pattern through the wetland
16. Fish and wildlife inhabiting the wetland
17. Relationship of wetland to other wildlife habitats in the landscape unit and the corridors
between them
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 103
Guide Sheet 2
1. Existing and potential stormwater pollution sources
2. Existing and projected landscape unit land use (see number 4 under Guide Sheet 1)
3. Existing and projected wetland hydroperiod characteristics
4. Wetland bathymetry
5. Inlet and outlet locations and hydraulics
6. Landscape unit soils, geologic and hydrogeologic conditions
7. Wetland type and zones present (see number 11 under Guide Sheet 1)
8. Presence of breeding populations of native amphibian species
9. Presence of forest and wetland obligate bird species
10. Presence of fish species
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 104
Wetlands Guidance Appendix 2: Definitions
Baseline sampling Sampling performed to define an existing state before any
modification occurs that could change the state.
Bioengineering Restoration or reinforcement of slopes and stream banks with
living plant materials.
Buffer The area that surrounds a wetland and that reduces adverse
impacts to it from adjacent development.
Constructed wetland A wetland intentionally created from a non-wetland site for the
sole purpose of wastewater or stormwater treatment. These
wetlands are not normally considered Waters of the United States
or Waters of the State.
Degraded (disturbed)
wetland (community)
A wetland (community) in which the vegetation, soils,
and/or hydrology have been adversely altered,
resulting in lost or reduced functions and values;
generally, implies topographic isolation; hydrologic
alterations such as hydroperiod alteration (increased or
decreased quantity of water), diking, channelization,
and/or outlet modification; soils alterations such as
presence of fill, soil removal, and/or compaction;
accumulation of toxicants in the biotic or abiotic
components of the wetland; and/or low plant species
richness with dominance by invasive weedy species
Enhancement Actions performed to improve the condition of an existing
degraded wetland, so that functions it provides are of a higher
quality.
Estuarine wetland Generally, an eelgrass bed; salt marsh; or rocky, sandflat, or
mudflat intertidal area where fresh and salt water mix.
(Specifically, a tidal wetland with salinity greater than 0.5 parts per
thousand, usually semi-enclosed by land but with partly obstructed
or sporadic access to the open ocean).
Forested communities
(wetlands)
In general terms, communities (wetlands) characterized by
woody vegetation that is greater than or equal to 6 meters in
height; in these guidelines the term applies to such communities
(wetlands) that represent a significant amount of tree cover
consisting of species that offer wildlife habitat and other values
and advance the performance of wetland functions overall.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 105
Functions The ecological (physical, chemical, and biological) processes or
attributes of a wetland without regard for their importance to
society (see also Values). Wetland functions include food chain
support, provision of ecosystem diversity and fish and wildlife
habitat, flood flow alteration, groundwater recharge and discharge,
water quality improvement, and soil stabilization.
Hydrodynamics The science involving the energy and forces acting on water and
its resulting motion.
Hydroperiod The seasonal occurrence of flooding and/or soil saturation;
encompasses the depth, frequency, duration, and seasonal
pattern of inundation.
Invasive weedy plant
species
Opportunistic species of inferior biological value that tend to out-
compete more desirable forms and become dominant; applied to
non-native species in these guidelines.
Landscape unit An area of land that has a specified boundary and is the locus of
interrelated physical, chemical, and biological processes.
Modification, Modified
(wetland)
A wetland whose physical, hydrological, or water quality
characteristics have been purposefully altered for a management
purpose, such as by dredging, filling, forebay construction, and
inlet or outlet control.
On-site An action (here, for stormwater management purposes) taken
within the property boundaries of the site to which the action
applies.
Polishing Advanced treatment of a waste stream that has already received
one or more stages of treatment by other means.
Pre-development, post-
development
Respectively, the situation before and after a specific stormwater
management project (e. g., raising the outlet, building an outlet
control structure) will be placed in the wetland or a land use
change occurs in the landscape unit that will potentially affect the
wetland.
Pre-treatment An action taken to remove pollutants from runoff before it is
discharged into another system for additional treatment.
Priority peat systems Unique, irreplaceable fens that can exhibit water pH in a wide
range from highly acidic to alkaline, including fens typified by
Sphagnum species, Rhododendron groenlandicum (Labrador tea),
Drosera rotundifolia (sundew), and Vaccinium oxycoccos (bog
cranberry); marl fens; estuarine peat deposits; and other moss
peat systems with relatively diverse, undisturbed flora and fauna.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 106
Bog is the common name for peat systems having the Sphagnum
association described, but this term applies strictly only to systems
that receive water income from precipitation exclusively.
Rare, threatened, or
endangered species
Plant or animal species that are regional relatively uncommon,
are nearing endangered status, or whose existence is in
immediate jeopardy and is usually restricted to highly specific
habitats. Threatened and endangered species are officially listed
by federal and state authorities, whereas rare species are
unofficial species of concern that fit the above definitions.
Redevelopment Conversion of an existing development to another land use, or
addition of a material improvement to an existing development.
Regional An action (here, for stormwater management purposes) that
involves more than one discrete property.
Restoration Actions performed to reestablish wetland functional characteristics
and processes that have been lost by alterations, activities, or
catastrophic events in an area that no longer meets the definition
of a wetland.
Source control best
management practices
(BMPs)
Actions that are taken to prevent the development of a problem
(e. g., increase in runoff quantity, release of pollutants) at the
point of origin.
Stage excursion A post-development departure, either higher or lower, from the
water depth existing under a given set of conditions in the pre-
development state.
Structure The components of an ecosystem, both the abiotic (physical and
chemical) and biotic (living).
Treatment best
management practices
(BMPs)
Actions that remove pollutants from runoff through one or more
physical, chemical, biological mechanisms.
Unusual biological
community types
Assemblages of interacting organisms that are relatively
uncommon regionally.
Values Wetland processes or attributes that are valuable or beneficial to
society (also see Functions). Wetland values include support of
commercial and sport fish and wildlife species, protection of life
and property from flooding, recreation, education, and aesthetic
enhancement of human communities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 107
Vernal wetland A wetland that has water above the soil surface for a period of
time during and/or after the wettest season but always dries to or
below the soil surface in warmer, drier weather.
Wetland obligate A biological organism that absolutely requires a wetland habitat for
at least some stage of its life cycle.
Wetlands Those areas that are inundated or saturated by surface or ground
water at a frequency and duration sufficient to support, and that
under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions.
Wetlands generally include swamps, marshes, bogs, and similar
areas. Wetlands do not include those artificial wetlands
intentionally created from non-wetland sites, including, but not
limited to, irrigation and drainage ditches, grass-lined swales,
canals, detention facilities, wastewater treatment facilities, farm
ponds, and landscape amenities, or those wetlands created after
July 1, 1990, that were unintentionally created as a result of the
construction of a road, street, or highway. Wetlands may include
those artificial wetlands intentionally created from non-wetland
areas to mitigate the conversion of wetlands. (Waterbodies not
included in the definition of wetlands as well as those mentioned
in the definition are still waters of the state.)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 108
Wetlands Guidance Appendix 3: Native and Recommended
Noninvasive Plant Species for Wetlands in the Puget Sound Basin
CAUTION: Extracting plants from an existing wetland donor site can cause a significant negative
effect on that site. It is recommended that plants be obtained from native plant nursery stocks
whenever possible. Collections from existing wetlands should be limited in scale and undertaken with
care to avoid disturbing the wetland outside of the actual point of collection. Plant selection is a
complex task, involving matching plant requirements with environmental conditions. It should be
performed by a qualified wetlands botanist. Refer to Restoring Wetlands in Washington by the
Washington Department of Ecology for more information.
The following plants are preferred in Puget Sound Basin freshwater wetlands:
Open water zone Potamogeton species (pondweeds)
Nymphaea odorata (pond lily)
Brasenia schreberi (watershield)
Nuphar luteum (yellow pond lily)
Polygonum hydropiper (smartweed)
Alisma plantago-aquatica (broadleaf water plantain)
Ludwigia palustris (water purslane)
Menyanthes trifoliata (bogbean)
Utricularia minor, U. vulgaris (bladderwort)
Emergent zone Carex obnupta, C. utriculata, C. arcta, C. stipata, C. vesicaria C. aquatilis,
C. comosa, C. lenticularis (sedge)
Scirpus atricinctus (woolly bulrush)
Scirpus microcarpus (small-fruited bulrush)
Eleocharis palustris, E. ovata (spike rush)
Epilobium watsonii (Watson's willow herb)
Typha latifolia (common cattail) (Note: This native plant can be aggressive
but has been found to offer certain wildlife habitat and water quality
improvement benefits; use with care.)
Veronica americana, V. scutellata (American brookline, marsh speedwell)
Mentha arvensis (field mint)
Lycopus americanus, L. uniflora (bugleweed or horehound)
Angelica species (angelica)
Oenanthe sarmentosa (water parsley)
Heracleum lanatum (cow parsnip)
Glyceria grandis, G. elata (manna grass)
Juncus acuminatus (tapertip rush)
Juncus ensifolius (daggerleaf rush)
Juncus bufonius (toad rush)
Mimulus guttatus (common monkey flower)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 109
Scrub-shrub zone Salix lucida, S. rigida, S. sitchensis, S. scouleriana, S. pedicellaris (willow)
Lysichiton americanus (skunk cabbage)
Athyrium filix-femina (lady fern)
Cornus sericea (redstem dogwood)
Rubus spectabilis (salmonberry)
Physocarpus capitatus (ninebark)
Ribes species (gooseberry)
Rhamnus purshiana (cascara)
Sambucus racemosa (red elderberry) (occurs in wetland-upland transition)
Loniceria involucrata (black twinberry)
Oemleria cerasiformis (Indian plum)
Stachys cooleyae (Stachy's horsemint)
Prunus emarginata (bitter cherry)
Forested zone Populus balsamifera, ssp. trichocarpa (black cottonwood)
Fraxinus latifolia (Oregon ash)
Thuja plicata (western red cedar)
Picea sitchensis (Sitka spruce)
Alnus rubra (red alder)
Tsuga heterophylla (hemlock)
Acer circinatum (vine maple)
Maianthemum dilatatum (wild lily-of-the-valley)
Ivzula parviflora (small-flower wood rush)
Torreyochloa pauciflora (weak alkaligrass)
Ribes species (currants)
Bog Sphagnum species (sphagnum mosses)
Rhododendron groenlandicum (Labrador tea)
Vaccinium oxycoccos (bog cranberry)
Kalmia microphylla, ssp. occidentalis (bog laurel)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 110
The following exotic plants should not be introduced to existing, created, or constructed
Puget Sound Basin freshwater wetlands:
Hedera helix (English ivy)
Phalaris arundinacea (reed canarygrass)
Lythrum salicaria (purple loosestrife)
Iris pseudacorus (yellow iris)
Ilex aquifolia (holly)
Impatiens glandulifera (policeman’s helmet)
Lotus corniculatus (birdsfoot trefoil)
Lysimachia thyrsiflora (tufted loosestrife)
Myriophyllum species (water milfoil, parrot’s feather)
Polygonum cuspidatum (Japanese knotweed)
Polygonum sachalinense (giant knotweed)
Rubus discolor (Himalayan blackberry)
Tanacetum vulgare (common tansy)
The following native plants should not be introduced to existing, created, or constructed
Puget Sound Basin freshwater wetlands
Potentilla palustris (Pacific silverweed)
Solarum dulcimara (bittersweet nightshade)
Juncus effusus (soft rush)
Conium maculatum (poison hemlock)
Ranunculus repens (creeping buttercup)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 111
Wetlands Guidance Appendix 4: Comparison of Water Chemistry
Characteristics in Sphagnum Bog and Fen versus More Typical
Wetlands
Water Quality Variable Typical Wetlands Sphagnum Bogs and Fens
PH 6 - 7 3.5 - 4.5
Dissolved oxygen (mg/L) 4 - 8 Shallow surface layer
oxygenated, anoxic below
Cations Divalent Ca, Mg common Divalent Ca, Mg uncommon;
Univalent Na, K predominant
Anions HCO3
-, CO3
2- predominant Cl-, SO4
2- predominant; almost
no HCO3-, CO32- (organic acids
form buffering system)
Hardness Moderate Very low
Total phosphorus (g/L) 50 - 500 5 - 50
Total Kjeldahl nitrogen (g/L) 500 - 1000 ~ 50
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetlands and Stormwater Volume I
Management Guidelines Appendix E 112
Wetland Protection Guidelines References
Chin, N. T. 1996. Watershed Urbanization Effects on Palustrine Wetlands: A Study of the
Hydrologic, Vegetative, and Amphibian Community Response over Eight Years. M. S. C. E.
Thesis, University of Washington, Seattle, WA.
Clymo, R. S. 1963. Ion exchange in Sphagnum and its relation to bog ecology. Annals of
Botany 27 (106):310-324.
Cooke, S. S., Puget Sound Wetlands and Stormwater Management Research Program,
unpublished Queen’s Bog data.
Horner, R. R. 1989. Long-term effects of urban runoff on wetlands. Pp. in L. A. Roesner, B.
Urbonas, and M. B. Sonnen (eds.), Design of Urban Runoff Controls, American Society of
Civil Engineers, New York, NY.
Horner, R. R., J. J. Skupien, E. H. Livingston, and H. E. Shaver. 1994. Fundamentals of
Urban Runoff Management: Technical and Institutional Issues. Terrene Institute,
Washington, D. C.
Horner, R. R., S. S. Cooke, K. O. Richter, A. L. Azous, L. E. Reinelt, B. L. Taylor, K. A.
Ludwa, and M. Valentine. 1996. Wetlands and Urbanization, Implications for the Future.
Puget Sound Wetlands and Stormwater Management Research Program, Engineering
Professional Programs, University of Washington, Seattle, WA.
Meyer, J., L. Vogel, and T. Duebendorfer, East Lake Sammamish wetland no. 21
unpublished data, submitted to L. Kulzer, King County Surface Water Management Division.
Moore, P. D. and D. J. Bellamy. 1974. Chapter 3, The Geochemical template. Peatlands.
Elek Science, London, U. K.
Thurman, E. M. 1985. Organic Geochemistry of Natural Waters. Martinus Nijhoff/Dr W.
Junk Publishers, Dordrecht, The Netherlands.
Vitt, D. H., D. G. Horton, N. G. Slack, and N. Malmer. 1990. Sphagnum-dominated
peatlands of the hyperoceanic British Columbia coast: Patterns in surface water chemistry
and vegetation. Canadian Journal of Forest Research 20:696-711.
Volume II
i Table of Contents
Volume II – Stormwater
Management for Construction Sites
Table of Contents
Purpose of this Volume...................................................................................................................113
Content and Organization of this Volume.......................................................................................113
Chapter 1 The 12 Elements of Construction Stormwater Pollution Prevention............114
Chapter 2 Developing a Construction Stormwater Pollution Prevention
Plan (SWPPP)...................................................................................................123
2.1 General Requirements and Guidelines.................................................................................123
2.1.1 BMP Standards and Specifications.................................................................................123
2.1.2 General Principles...........................................................................................................124
2.2 Step-by-Step Procedure........................................................................................................124
2.2.1 Step 1 – Data Collection..................................................................................................124
2.2.2 Step 2 – Data Analysis....................................................................................................125
2.2.3 Step 3 – Construction SWPPP Development and Analysis............................................127
2.2.3.1 Construction SWPPP Narrative............................................................................127
2.2.3.2 Erosion and Sediment Control Drawings..............................................................128
2.3 Construction SWPPP Checklists...........................................................................................128
Chapter 3 Standards and Specifications for Best Management Practices (BMPs).......134
3.1 Source Control BMPs............................................................................................................135
3.1.1 BMP C101: Preserving Natural Vegetation.....................................................................135
3.1.1.1 Purpose.................................................................................................................135
3.1.1.2 Conditions of Use..................................................................................................135
3.1.1.3 Design and Installation Specifications...................................................................135
3.1.1.4 Maintenance Standards........................................................................................137
3.1.2 BMP C102: Buffer Zone...................................................................................................138
3.1.2.1 Purpose.................................................................................................................138
3.1.2.2 Conditions of Use..................................................................................................138
3.1.2.3 Design and Installation Specifications...................................................................138
3.1.2.4 Maintenance Standards........................................................................................138
3.1.3 BMP C103: High Visibility Plastic or Metal Fence...........................................................139
3.1.3.1 Purpose.................................................................................................................139
3.1.3.2 Conditions of Use..................................................................................................139
3.1.3.3 Design and Installation Specifications...................................................................139
3.1.3.4 Maintenance Standards........................................................................................139
Volume II
ii Table of Contents
3.1.4 BMP C104: Stake and Wire Fence..................................................................................140
3.1.4.1 Purpose.................................................................................................................140
3.1.4.2 Conditions of Use..................................................................................................140
3.1.4.3 Design and Installation Specifications...................................................................140
3.1.4.4 Maintenance Standards........................................................................................140
3.1.5 BMP C105: Stabilized Construction Entrance.................................................................141
3.1.5.1 Purpose.................................................................................................................141
3.1.5.2 Conditions of Use..................................................................................................141
3.1.5.3 Design and Installation Specifications...................................................................141
3.1.5.4 Maintenance Standards........................................................................................141
3.1.6 BMP C106: Wheel Wash.................................................................................................144
3.1.6.1 Purpose.................................................................................................................144
3.1.6.2 Conditions of Use..................................................................................................144
3.1.6.3 Design and Installation Specifications...................................................................144
3.1.6.4 Maintenance Standards........................................................................................144
3.1.7 BMP C107: Construction Road/Parking Area Stabilization.............................................146
3.1.7.1 Purpose.................................................................................................................146
3.1.7.2 Conditions of Use..................................................................................................146
3.1.7.3 Design and Installation Specifications...................................................................146
3.1.7.4 Maintenance Standards........................................................................................147
3.1.8 BMP C120: Temporary and Permanent Seeding............................................................148
3.1.8.1 Purpose.................................................................................................................148
3.1.8.2 Conditions of Use..................................................................................................148
3.1.8.3 Design and Installation Specifications...................................................................148
3.1.8.4 Maintenance Standards........................................................................................151
3.1.9 BMP C121: Mulching.......................................................................................................154
3.1.9.1 Purpose.................................................................................................................154
3.1.9.2 Conditions of Use..................................................................................................154
3.1.9.3 Design and Installation Specifications...................................................................154
3.1.9.4 Maintenance Standards........................................................................................154
3.1.10 BMP C122: Nets and Blankets........................................................................................156
3.1.10.1 Purpose.................................................................................................................156
3.1.10.2 Conditions of Use..................................................................................................156
3.1.10.3 Design and Installation Specifications...................................................................157
3.1.10.4 Maintenance Standards........................................................................................158
3.1.11 BMP C123: Plastic Covering...........................................................................................161
3.1.11.1 Purpose.................................................................................................................161
3.1.11.2 Conditions of Use..................................................................................................161
3.1.11.3 Design and Installation Specifications...................................................................161
3.1.11.4 Maintenance Standards........................................................................................162
3.1.12 BMP C124: Sodding........................................................................................................164
3.1.12.1 Purpose.................................................................................................................164
3.1.12.2 Conditions of Use..................................................................................................164
3.1.12.3 Design and Installation Specifications...................................................................164
Volume II
iii Table of Contents
3.1.12.4 Maintenance Standards........................................................................................164
3.1.13 BMP C125: Compost.......................................................................................................165
3.1.13.1 Purpose.................................................................................................................165
3.1.13.2 Conditions of Use..................................................................................................165
3.1.13.3 Design and Installation Specifications...................................................................165
3.1.13.4 Maintenance Standards........................................................................................166
3.1.14 BMP C126: Topsoiling.....................................................................................................167
3.1.14.1 Purpose.................................................................................................................167
3.1.14.2 Conditions of Use..................................................................................................167
3.1.14.3 Design and Installation Specifications...................................................................167
3.1.14.4 Maintenance Standards........................................................................................169
3.1.15 BMP C127: Polyacrylamide for Soil Erosion Protection..................................................170
3.1.15.1 Purpose.................................................................................................................170
3.1.15.2 Conditions of Use..................................................................................................170
3.1.15.3 Design and Installation Specifications...................................................................170
3.1.15.4 Maintenance Standards........................................................................................172
3.1.16 BMP C130: Surface Roughening....................................................................................173
3.1.16.1 Purpose.................................................................................................................173
3.1.16.2 Conditions for Use.................................................................................................173
3.1.16.3 Design and Installation Specifications...................................................................173
3.1.16.4 Maintenance Standards........................................................................................173
3.1.17 BMP C131: Gradient Terraces........................................................................................175
3.1.17.1 Purpose.................................................................................................................175
3.1.17.2 Conditions of Use..................................................................................................175
3.1.17.3 Design and Installation Specifications...................................................................175
3.1.17.4 Maintenance Standards........................................................................................176
3.1.18 BMP C140: Dust Control.................................................................................................177
3.1.18.1 Purpose.................................................................................................................177
3.1.18.2 Conditions of Use..................................................................................................177
3.1.18.3 Design and Installation Specifications...................................................................177
3.1.18.4 Maintenance Standards........................................................................................178
3.1.19 BMP C150: Materials On Hand.......................................................................................179
3.1.19.1 Purpose.................................................................................................................179
3.1.19.2 Conditions of Use..................................................................................................179
3.1.19.3 Design and Installation Specifications...................................................................179
3.1.19.4 Maintenance Standards........................................................................................179
3.1.20 BMP C151: Concrete Handling.......................................................................................180
3.1.20.1 Purpose.................................................................................................................180
3.1.20.2 Conditions of Use..................................................................................................180
3.1.20.3 Design and Installation Specifications...................................................................180
3.1.20.4 Maintenance Standards........................................................................................180
3.1.21 BMP C152: Sawcutting and Surfacing Pollution Prevention...........................................181
3.1.21.1 Purpose.................................................................................................................181
3.1.21.2 Conditions of Use..................................................................................................181
Volume II
iv Table of Contents
3.1.21.3 Design and Installation Specifications...................................................................181
3.1.21.4 Maintenance Standards........................................................................................181
3.1.22 BMP C153: Material Delivery, Storage and Containment...............................................182
3.1.22.1 Purpose.................................................................................................................182
3.1.22.2 Conditions of Use..................................................................................................182
3.1.22.3 Design and Installation Specifications...................................................................182
3.1.22.4 Material Storage Areas and Secondary Containment Practices:..........................183
3.1.23 BMP C154: Concrete Washout Area...............................................................................184
3.1.23.1 Purpose.................................................................................................................184
3.1.23.2 Conditions of Use..................................................................................................184
3.1.23.3 Implementation......................................................................................................184
3.1.23.4 Education..............................................................................................................185
3.1.23.5 Contracts...............................................................................................................185
3.1.23.6 Location and Placement Considerations:.............................................................185
3.1.23.7 Onsite Temporary Concrete Washout Facility, Transit Truck
Washout Procedures:...........................................................................................185
3.1.23.8 Inspection and Maintenance.................................................................................186
3.1.23.9 Removal of Temporary Concrete Washout Facilities............................................187
3.1.24 BMP C160: Certified Erosion and Sediment Control Lead..............................................190
3.1.24.1 Purpose.................................................................................................................190
3.1.24.2 Conditions of Use..................................................................................................190
3.1.24.3 Specifications........................................................................................................190
3.1.25 BMP C161: Payment of Erosion Control Work................................................................192
3.1.25.1 Purpose.................................................................................................................192
3.1.25.2 Conditions of Use..................................................................................................192
3.1.26 BMP C162: Scheduling....................................................................................................193
3.1.26.1 Purpose.................................................................................................................193
3.1.26.2 Conditions of Use..................................................................................................193
3.1.26.3 Design Considerations..........................................................................................193
3.1.27 BMP C180: Small Project Construction Stormwater Pollution Prevention......................194
3.1.27.1 Purpose.................................................................................................................194
3.1.27.2 Conditions of Use..................................................................................................194
3.1.27.3 Design and Installation Specifications...................................................................194
3.2 Runoff, Conveyance and Treatment BMPs...........................................................................196
3.2.1 BMP C200: Interceptor Dike and Swale..........................................................................196
3.2.1.1 Purpose.................................................................................................................196
3.2.1.2 Conditions of Use..................................................................................................196
3.2.1.3 Design and Installation Specifications...................................................................196
3.2.2 BMP C201: Grass-Lined Channels.................................................................................199
3.2.2.1 Purpose.................................................................................................................199
3.2.2.2 Conditions of Use..................................................................................................199
3.2.2.3 Design and Installation Specifications...................................................................199
3.2.2.4 Maintenance Standards........................................................................................200
3.2.3 BMP C202: Channel Lining.............................................................................................203
Volume II
v Table of Contents
3.2.3.1 Purpose.................................................................................................................203
3.2.3.2 Conditions of Use..................................................................................................203
3.2.3.3 Design and Installation Specifications...................................................................203
3.2.4 BMP C203: Water Bars...................................................................................................205
3.2.4.1 Purpose.................................................................................................................205
3.2.4.2 Conditions of Use..................................................................................................205
3.2.4.3 Design and Installation Specifications...................................................................205
3.2.4.4 Maintenance Standards........................................................................................206
3.2.5 BMP C204: Pipe Slope Drains........................................................................................207
3.2.5.1 Purpose.................................................................................................................207
3.2.5.2 Conditions of Use..................................................................................................207
3.2.5.3 Design and Installation Specifications...................................................................207
3.2.5.4 Maintenance Standards........................................................................................208
3.2.6 BMP C205: Subsurface Drains........................................................................................210
3.2.6.1 Purpose.................................................................................................................210
3.2.6.2 Conditions of Use..................................................................................................210
3.2.6.3 Design and Installation Specifications...................................................................210
3.2.6.4 Maintenance Standards........................................................................................212
3.2.7 BMP C206: Level Spreader.............................................................................................213
3.2.7.1 Purpose.................................................................................................................213
3.2.7.2 Conditions of Use..................................................................................................213
3.2.7.3 Design and Installation Specifications...................................................................213
3.2.7.4 Maintenance Standards........................................................................................214
3.2.8 BMP C207: Check Dams.................................................................................................215
3.2.8.1 Purpose.................................................................................................................215
3.2.8.2 Conditions of Use..................................................................................................215
3.2.8.3 Design and Installation Specifications...................................................................215
3.2.8.4 Maintenance Standards........................................................................................216
3.2.9 BMP C208: Triangular Silt Dike (Geotextile-Encased Check Dam)................................218
3.2.9.1 Purpose.................................................................................................................218
3.2.9.2 Conditions of Use..................................................................................................218
3.2.9.3 Design and Installation Specifications...................................................................218
3.2.9.4 Maintenance Standards........................................................................................219
3.2.10 BMP C209: Outlet Protection..........................................................................................222
3.2.10.1 Purpose.................................................................................................................222
3.2.10.2 Conditions of Use..................................................................................................222
3.2.10.3 Design and Installation Specifications...................................................................222
3.2.10.4 Maintenance Standards........................................................................................223
3.2.11 BMP C220: Storm Drain Inlet Protection.........................................................................224
3.2.11.1 Purpose.................................................................................................................224
3.2.11.2 Conditions of Use..................................................................................................224
3.2.11.3 Design and Installation Specifications...................................................................225
3.2.11.4 Maintenance Standards........................................................................................232
3.2.12 BMP C231: Brush Barrier................................................................................................234
Volume II
vi Table of Contents
3.2.12.1 Purpose.................................................................................................................234
3.2.12.2 Conditions of Use..................................................................................................234
3.2.12.3 Design and Installation Specifications...................................................................234
3.2.12.4 Maintenance Standards........................................................................................234
3.2.13 BMP C232: Gravel Filter Berm........................................................................................236
3.2.13.1 Purpose.................................................................................................................236
3.2.13.2 Conditions of Use..................................................................................................236
3.2.13.3 Design and Installation Specifications...................................................................236
3.2.13.4 Maintenance Standards........................................................................................236
3.2.14 BMP C233: Silt Fence.....................................................................................................237
3.2.14.1 Purpose.................................................................................................................237
3.2.14.2 Conditions of Use..................................................................................................237
3.2.14.3 Design and Installation Specifications...................................................................237
3.2.14.4 Maintenance Standards........................................................................................240
3.2.15 BMP C234: Vegetated Strip.............................................................................................243
3.2.15.1 Purpose.................................................................................................................243
3.2.15.2 Conditions of Use..................................................................................................243
3.2.15.3 Design and Installation Specifications...................................................................243
3.2.15.4 Maintenance Standards........................................................................................243
3.2.16 BMP C235: Straw Wattles...............................................................................................244
3.2.16.1 Purpose.................................................................................................................244
3.2.16.2 Conditions of Use..................................................................................................244
3.2.16.3 Design Criteria.......................................................................................................244
3.2.16.4 Maintenance Standards........................................................................................245
3.2.17 BMP C240: Sediment Trap..............................................................................................247
3.2.17.1 Purpose.................................................................................................................247
3.2.17.2 Conditions of Use..................................................................................................247
3.2.17.3 Design and Installation Specifications...................................................................248
3.2.17.4 Maintenance Standards........................................................................................250
3.2.18 BMP C241: Temporary Sediment Pond..........................................................................251
3.2.18.1 Purpose.................................................................................................................251
3.2.18.2 Conditions of Use..................................................................................................251
3.2.18.3 Design and Installation Specifications...................................................................251
3.2.18.4 Maintenance Standards........................................................................................254
3.2.19 BMP C250: Construction Stormwater Chemical Treatment............................................258
3.2.19.1 Purpose.................................................................................................................258
3.2.19.2 Conditions of Use..................................................................................................258
3.2.19.3 Design and Installation Specifications...................................................................258
3.2.19.4 Monitoring..............................................................................................................263
3.2.20 BMP C251: Construction Stormwater Filtration...............................................................265
3.2.20.1 Purpose.................................................................................................................265
3.2.20.2 Conditions of Use..................................................................................................265
3.2.20.3 Background Information........................................................................................265
3.2.20.4 Design and Installation Specifications...................................................................265
Volume II
vii Table of Contents
3.2.20.5 Maintenance Standards........................................................................................268
3.2.21 BMP C252: High pH Neutralization using CO2................................................................269
3.2.21.1 Description............................................................................................................269
3.2.21.2 Treatment Procedures...........................................................................................270
3.2.21.3 Safety and Materials Handling..............................................................................271
3.2.21.4 Operator Records..................................................................................................271
3.2.22 BMP C253: pH Control for High pH Water......................................................................272
3.2.22.1 Description............................................................................................................272
3.2.22.2 Disposal Methods..................................................................................................272
Appendix A Standard Notes for Erosion Control Plans.....................................................273
Appendix B Background Information on Chemical Treatment..........................................274
Appendix C Construction SWPPP Short Form...................................................................277
THIS PAGE INTENTIONALLY LEFT BLANK.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Purpose Volume II
Content and Organization Introduction 113
Volume II:
Stormwater Management for
Construction Sites
Purpose of this Volume
This volume of the Surface Water Management Manual discusses stormwater impacts and controls
associated with construction activities. It addresses the planning, design, and implementation of
stormwater management activities prior to and during the construction phase of projects.
The purpose of this volume is to provide guidance to prevent construction activities from adversely
impacting downstream resources and on-site stormwater flows. Prevention of soil erosion, capture of
water-borne sediment that has been unavoidably released from exposed soils, and protection of
water quality from on-site pollutant sources are all readily achievable when the proper Best
Management Practices (BMPs) are planned, installed, and properly maintained.
Content and Organization of this Volume
Volume II consists of three chapters that address the preparation and implementation of Construction
Stormwater Pollution Prevention Plans (SWPPPs).
• Chapter 1 describes the 12 elements of stormwater pollution prevention.
• Chapter 2 presents a step-by-step method for developing a Construction SWPPP. It
encourages examination of all possible conditions that could reasonably affect a
particular project’s stormwater control systems during the construction phase of the
project.
• Chapter 3 contains BMPs for construction stormwater control and site management.
The first section of Chapter 3 contains BMPs for Source Control. The second section
addresses runoff, conveyance, and treatment BMPs. Various combinations of these
BMPs should be used in the Construction SWPPP to satisfy each of the 12 elements
applying to the project.
Volume
II
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 114
Chapter 1 The 12 Elements of Construction
Stormwater Pollution Prevention
The 12 elements of construction stormwater pollution prevention cover the general water quality
protection strategies of limiting site impacts, preventing erosion and sedimentation, and managing
activities and sources. The applicant is required to address the following 12 elements in the
construction stormwater pollution prevention plan (SWPPP). If an element is considered
unnecessary, the Construction SWPPP must describe why that element is not needed.
The 12 elements are:
• Element 1 – Mark Clearing Limits
• Element 2 – Establish Construction Access
• Element 3 – Control Flow Rates
• Element 4 – Install Sediment Controls
• Element 5 – Stabilize Soils
• Element 6 – Protect Slopes
• Element 7 – Protect Drain Inlets
• Element 8 – Stabilize Channels and Outlets
• Element 9 – Control Pollutants
• Element 10 – Control Dewatering
• Element 11 – Maintain BMPs
• Element 12 – Manage the Project
Element #1: Mark Clearing Limits
• Before beginning any land disturbing activities, including clearing and grading, clearly
mark all clearing limits, sensitive areas and their buffers, and trees that are to be
preserved within the construction area to prevent damage and offsite impacts. Mark
clearing limits both in the field and on the plans.
• Plastic, metal, or stake wire fence may be used to mark the clearing limits.
• Suggested BMPs:
o BMP C101: Preserving Natural Vegetation
o BMP C102: Buffer Zones
o BMP C103: High Visibility Plastic or Metal Fence
o BMP C104: Stake and Wire Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 115
Element #2: Establish Construction Access
• Construction vehicle ingress and egress shall be limited to one route. Additional
routes may be allowed for very large projects or linear projects.
• Access points shall be stabilized per BMP C105 – Stabilized Construction Entrance.
• Wheel wash or tire baths shall be located on site, if applicable. Wheel washes shall
be required if other measures fail to control sediment from leaving the site.
• No tracking of sediment onto the roadway is allowed. If sediment is tracked onto the
road, the road shall be thoroughly and immediately cleaned by shoveling or pickup
sweeping. Transport sediment to a controlled sediment disposal area.
• Keep streets clean at ALL times. Clean tracked sediment immediately.
• Street washing of sediment to the storm drain system is not allowed.
• Suggested BMPs:
o BMP C105: Stabilized Construction Entrance
o BMP C106: Wheel Wash
o BMP C107: Construction Road/Parking Area Stabilization
Element #3: Control Flow Rates
• Protect properties and waterways downstream of development sites from erosion
due to increases in the volume, velocity, and peak flow rate of stormwater runoff from
the project site.
• Conduct a downstream analysis if changes to offsite flows could impair or alter
conveyance systems, stream banks, bed sediment, or aquatic habitat. See Volume I,
Chapter 3 – Minimum Requirement #11 for offsite analysis guidelines.
• Construct stormwater detention facilities as one of the first steps in grading.
Detention facilities shall be functional prior to construction of site improvements (e.g.
impervious surfaces).
• During construction, the City may require non-standard temporary sediment control
pond designs in order to provide additional flow control necessary to address local
conditions or to protect properties and waterways downstream from erosion due to
construction activities.
• Permanent infiltration ponds shall not be used for flow control during construction
unless specifically allowed in writing by the City. If allowed, these facilities shall be
protected from siltation during the construction phase as required by the City. A liner
may be required. The ponds shall be excavated to final grade after the site is
stabilized.
• Suggested BMPs:
o BMP C240: Sediment Trap
o BMP C241: Temporary Sediment Pond
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 116
Element #4: Install Sediment Controls
• Retain the duff layer, native topsoil, and natural vegetation in an undisturbed state to
the maximum extent practicable. If it is not practicable to retain the duff layer in
place, it should be stockpiled on-site, covered to prevent erosion, and replaced
immediately upon completion of the ground disturbing activities.
• Prior to leaving a construction site or prior to discharge to an infiltration facility,
surface water runoff from disturbed areas shall pass through a sediment pond or
other appropriate sediment removal BMP.
• Construct sediment ponds, vegetated buffer strips, sediment barriers or filters, dikes,
and other BMPs intended to trap sediment on site as one of the first steps in grading.
These BMPs shall be functional before other land disturbing activities take place.
• Locate BMPs in a manner to avoid interference with the movement of juvenile
salmonids attempting to enter off-channel areas or drainages.
• Seed and mulch earthen structures such as dams, dikes, and diversions according to
the timing indicated in Element #5.
• Suggested BMPs:
o BMP C231: Brush Barrier
o BMP C232: Gravel Filter Berm
o BMP C233: Silt Fence
o BMP C234: Vegetated Strip
o BMP C235: Straw Wattles
o BMP C240: Sediment Trap
o BMP C241: Temporary Sediment Pond
o BMP C250: Construction Stormwater Chemical Treatment
o BMP C251: Construction Stormwater Filtration
• Proprietary technologies exist that can be used for sediment control. Ecology to
determine if the temporary sediment control device is equivalent to an existing BMP
or requires Ecology approval via the Technology Assessment Protocol Ecology
program.
Element #5: Stabilize Soils
• Stabilize exposed and unworked soils by application of effective BMPs that protect
the soil from the erosive forces of raindrop impact, flowing water, and wind.
• From October 1 through April 30, no soils shall remain exposed and unworked for
more than 2 days. From May 1 to September 30, no soils shall remain exposed and
unworked for more than 7 days. This stabilization requirement applies to all soils on
site, whether at final grade or not. (See City’s Clearing and Grading Code
ACC 15.74).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 117
• Stabilize soils at the end of the shift, before a holiday or weekend, if needed, based
on the weather forecast.
• Select appropriate soil stabilization measures for the time of year, site conditions,
estimated duration of use, and the potential water quality impacts that stabilization
agents may have on downstream waters or groundwater.
• Stabilize soil stockpiles from erosion, protect stockpiles with sediment trapping
measures, and where possible, locate piles away from storm drain inlets, waterways,
and drainage channels.
• Suggested BMPs:
o BMP C120: Temporary and Permanent Seeding
o BMP C121: Mulching
o BMP C122: Nets and Blankets
o BMP C123: Plastic Covering
o BMP C124: Sodding
o BMP C125: Compost
o BMP C126: Topsoiling
o BMP C127: Polyacrylamide for Soil Erosion Protection
o BMP C130: Surface Roughening
o BMP C131: Gradient Terraces
o BMP C140: Dust Control
o BMP C180: Small Project Construction Stormwater Pollution Prevention
Element #6: Protect Slopes
• Reduce slope runoff velocities by reducing continuous length of slope with terracing
and diversions, reducing slope steepness, and/or roughing slope surface.
• Divert off-site stormwater (sometimes called run-on) away from slopes and disturbed
areas with interceptor dikes and/or swales. Manage off-site stormwater separately
from stormwater generated on the site.
• At the top of slopes, collect drainage in pipe slope drains or protected channels to
prevent erosion. Size temporary pipe slope drains for the peak flow from a 10-year,
24-hour event. Alternatively, the 10-year and 25-year, 1-hour flow rates indicated by
WWHM, increased by a factor of 1.6, may be used. Size permanent pipe slope
drains for the 25-year, 24-hour event. Use the existing land cover condition for
predicting flow rates from tributary areas outside the project limits for the hydrologic
analysis. For tributary areas on the project site, use the temporary or permanent
project land cover condition, whichever will produce the higher flows for the analysis.
If using WWHM to predict flows, model bare soils and landscaped areas.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 118
• Provide drainage to remove groundwater seepage from the slope surface of exposed
soil areas.
• Place excavated material on the uphill side of trenches, consistent with safety and
space considerations.
• Place check dams at regular intervals within channels that are cut down a slope.
• Stabilize soils on slopes, as specified in Element #5.
• Suggested BMPs:
o BMP C120: Temporary and Permanent Seeding
o BMP C130: Surface Roughening
o BMP C131: Gradient Terraces
o BMP C200: Interceptor Dike and Swale
o BMP C201: Grass-Lined Channels
o BMP C204: Pipe Slope Drains
o BMP C205: Subsurface Drains
o BMP C206: Level Spreader
o BMP C207: Check Dams
o BMP C208: Triangular Silt Dike (Geotextile-Encased
Check Dam)
Element #7: Protect Drain Inlets
• Protect all storm drain inlets that are operable during construction so that stormwater
runoff does not enter the conveyance system without first being filtered or treated to
remove sediment.
• Keep all approach roads clean. Do not allow sediment to enter storm drains.
• Inspect inlets weekly at a minimum and after each storm events. Clean or remove
and replace inlet protection devices when sediment has filled one-third of the
available storage (unless a different standard is specified by the product
manufacturer).
• Suggested BMPs:
o BMP C220: Storm Drain Inlet Protection
Element #8: Stabilize Channels and Outlets
• Design, construct, and stabilize all temporary on-site conveyance channels to
prevent erosion from the expected peak 10-minute velocity of a 10-year, 24-hour
frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow
rate indicated by an approved continuous runoff model, increased by a factor of 1.6,
may be used. For tributary areas outside the project limits, use the existing land
cover conditions for predicting flow rates from tributary areas outside the project
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 119
limits for the hydrologic analysis. For tributary areas on the project site, use the
temporary or permanent project land cover condition, whichever will produce the
highest flow rates, for the hydrologic analysis. If using WWHM, model bare soils as
landscaped.
• Provide stabilization, including armoring material, adequate to prevent erosion of
outlets, adjacent stream banks, slopes, and downstream reaches at the outlets of all
conveyance systems.
• Suggested BMPs:
o BMP C202: Channel Lining
o BMP C209: Outlet Protection
Element #9: Control Pollutants
• All discharges to the City sewer system (storm or sanitary sewers) require City
approval.
• Handle and dispose of all pollutants, including waste materials and demolition debris
that occur on site during construction in a manner that does not cause contamination
of stormwater. Woody debris may be chopped and spread on site.
• Provide cover, containment, and protection for all chemicals, liquid products,
petroleum products, and other materials that have the potential to pose a threat to
human health and the environment. Include secondary containment for on-site
fueling tanks.
• Use spill prevention and control measures, such as drip pans, when conducting
maintenance and repair of heavy equipment and vehicles involving oil changes,
hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank
drain down and removal, and other activities which may result in discharge or
spillage of pollutants to the ground or into stormwater runoff. Clean contaminated
surfaces immediately following any discharge or spill incident. Emergency repairs
may be performed on-site using temporary plastic placed beneath and, if raining,
over the vehicle.
• Discharge wheel wash or tire bath wastewater to a separate on-site treatment
system or to the sanitary sewer.
• Only apply agricultural chemicals, including fertilizers and pesticides, when
absolutely necessary and only in a manner and at application rates that will not result
in loss of chemical to stormwater runoff. Follow manufacturers’ recommendations for
application rates and procedures.
• Use BMPs to prevent or treat contamination of stormwater runoff by pH modifying
sources. These sources include, but are not limited to, bulk cement, cement kiln
dust, fly ash, new concrete washing and curing waters, waste streams generated
from concrete grinding and sawing, exposed aggregate processes, and concrete
pumping and mixer washout waters. Construction site operators must adjust the pH
of stormwater to prevent violations of water quality standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 120
• Written approval from the Department of Ecology is required prior to using chemical
treatment other than CO2 or dry ice to adjust pH.
• Suggested BMPs:
o BMP C151: Concrete Handling
o BMP C152: Sawcutting and Surfacing Pollution Prevention
o BMP C154: Concrete Washout Area
o Source Control BMPs from Volume IV, as appropriate
Element #10: Control Dewatering
• All discharges to the City sewer system (storm or sanitary sewers) require City
approval.
• Discharge foundation, vault, and trench dewatering water that has similar
characteristics to site stormwater runoff into a controlled conveyance system prior to
discharge to a sediment pond or sediment tank/vault. Stabilize channels as specified
in Element #8.
• Clean, non-turbid dewatering water, such as well-point groundwater, can be
discharged to systems tributary to state surface waters, as specified in Element #8,
provided the dewatering flow does not cause erosion or flooding of receiving waters.
These clean waters should not be routed through stormwater sediment ponds/tanks.
• Handle highly turbid or contaminated dewatering water from construction equipment
operation, clamshell digging, concrete tremie pour, or work inside a cofferdam
separately from stormwater at the site.
• Other disposal options, depending on site constraints, may include:
o Infiltration
o Transport off-site in vehicle, such as a vacuum flush truck, for legal disposal
in a manner that does not pollute state waters
o Ecology approved on-site chemical treatment or other suitable treatment
technologies
o Use of a sedimentation bag with outfall to a ditch or swale for small volumes
of localized dewatering
Element #11: Maintain BMPs
• Maintain and repair as needed all temporary and permanent erosion and sediment
control BMPs to assure continued performance of their intended function. Conduct
maintenance and repair in accordance with BMP specifications.
• Remove temporary erosion and sediment control BMPs within 30 days after final site
stabilization is achieved or after the temporary BMPs are no longer needed. Trapped
sediment shall be removed or stabilized on site. Permanently stabilize disturbed soil
resulting from removal of BMPs or vegetation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 121
Element #12: Manage the Project
• Phasing of Construction – Phase development projects in order to prevent soil
erosion and the transport of sediment from the project site during construction,
unless the project engineer can demonstrate that construction phasing is infeasible.
Revegetation of exposed areas and maintenance of that vegetation shall be an
integral part of the clearing activities for any phase.
• Seasonal Work Limitations – From October 1 through April 30, clearing, grading,
and other soil disturbing activities shall only be permitted if shown to the satisfaction
of the City that silt-laden runoff will be prevented from leaving the site through a
combination of the following:
o Site conditions including existing vegetative coverage, slope, soil type, and
proximity to receiving waters;
o Limitations on activities and the extent of disturbed areas; and
o Proposed erosion and sediment control measures.
Based on the information provided and local weather conditions, the City may expand or
restrict the seasonal limitation on site disturbance. The following activities are exempt from
the seasonal clearing and grading limitations:
o Routine maintenance and necessary repair of erosion and sediment control
BMPs
o Routine maintenance of public facilities or existing utility structures that do not
expose the soil or result in the removal of the vegetative cover to soil
o Activities where there is one hundred percent infiltration of surface water
runoff within the site in approved and installed erosion and sediment control
facilities
• Coordination with Utilities and Other Contractors – Include surface water
management requirements for the entire project, including the utilities and other
contractors, in the Construction SWPPP.
• Inspection and Monitoring – Inspect, maintain, and repair all BMPs as needed to
assure continued performance of their intended function. At a minimum, inspect all
BMPs after each storm event. Site inspections shall be conducted by a person who
is knowledgeable in the principles and practices of erosion and sediment control. The
person must have the skills to 1) assess the site conditions and construction
activities that could impact the quality of stormwater, and 2) assess the effectiveness
of erosion and sediment control measures used to control the quality of stormwater
discharges.
For construction sites one acre or larger that discharge to surface waters of the state, a
Certified Erosion and Sediment Control Lead (CESCL) shall be identified in the Construction
SWPPP and shall be on-site or on-call at all times. Certification must be obtained through an
Ecology-approved training program.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
The 12 Elements of Construction Volume II
Stormwater Pollution Prevention Chapter 1 122
Sampling and analysis of the surface water discharges from a construction site may be
necessary on a case-by-case basis to ensure compliance with standards. Ecology or the City
will establish these monitoring and associated reporting requirements.
Whenever inspection and/or monitoring reveals that the BMPs identified in the Construction
SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant
amount of any pollutant, the appropriate BMPs or design changes shall be implemented as
soon as possible.
• Reporting – Report spillage or discharge of pollutants within 24-hours to the City of
Auburn Spill Hotline 24-hour phone number at (253) 931-3048.
• Maintenance of the Construction SWPPP – Keep the Construction SWPPP on-site
or within reasonable access to the site. Modify the SWPPP whenever there is a
change in the design, construction, operation, or maintenance at the construction site
that has, or could have, a significant effect on the discharge of pollutants to waters of
the state.
Modify the SWPPP if, during inspections or investigations conducted by the owner/operator,
City staff, or by local or state officials, it is determined that the SWPPP is ineffective in
eliminating or significantly minimizing pollutants in stormwater discharges from the site.
Modify the SWPPP as necessary to include additional or modified BMPs designed to correct
problems identified. Complete revisions to the SWPPP within seven (7) days following the
inspection.
The inspector may require that a modification to the SWPPP go through additional City
review.
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 123
Chapter 2 Developing a Construction Stormwater
Pollution Prevention Plan (SWPPP)
This chapter provides an overview of the important components of, and the process for, developing
and implementing a Construction Stormwater Pollution Prevention Plan (SWPPP).
2.1 General Requirements and Guidelines
The Construction SWPPP is a document that describes the potential for pollution problems on a
construction project. The Construction SWPPP explains and illustrates the measures to be taken on
the construction site to control those problems.
All sites are required to comply with elements #1-#12.
Unless located in a critical area, a SWPPP is not required for projects that:
• Add or replace less than 2000 square feet of impervious surface, or,
• Disturb less than 7000 square feet of land
The Construction Stormwater Pollution Prevention Plan Short Form (Appendix C) may be used for
projects that:
• Add or replace between 2000 square feet and 5000 square feet of impervious
surface, or,
• Disturb between 7000 square feet and 1 acre
A complete SWPPP is required for projects that:
• Add or replace 5000 square feet or greater of impervious surface, or,
• Disturb greater than1 acre, or,
• Grade/Fill greater than 500 cubic yards of material.
The Construction SWPPP shall be prepared as a separate stand-alone document. Keep the
Construction SWPPP on the construction site or within reasonable access to the site for construction
and inspection personnel. As site work progresses, the plan must be modified to reflect changing site
conditions, subject to the rules for plan modification by the City.
Include all 12 elements described in Volume II, Chapter 1 in the Construction SWPPP unless an
element is determined not to be applicable to the project and the exemption is justified in the
narrative.
2.1.1 BMP Standards and Specifications
Chapter 3 of this volume contains standards and specifications for the BMPs referred to in this
chapter. Wherever any of these BMPs are to be employed on a site, clearly reference the specific title
and number of the BMP in the narrative and mark it on the drawings.
Where appropriate BMPs do not exist, experimental practices may be considered or minor
modifications to standard practices may be employed. Such practices must be approved by the City
before implementation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 124
2.1.2 General Principles
The following general principles should be applied to the development of any Construction SWPPP.
• Retain the duff layer, native topsoil, and natural vegetation in an undisturbed state to
the maximum extent practicable.
• Prevent pollutant release. Select source control BMPs as a first line of defense.
Prevent erosion rather than treat turbid runoff.
• Select BMPs depending on site characteristics (topography, drainage, soil type,
ground cover, and critical areas) and the construction plan.
• Divert runoff away from exposed areas wherever possible. Keep clean water clean.
• Limit the extent of clearing operations and phase construction operations.
• Before reseeding a disturbed soil area, amend all soils with compost wherever
topsoil has been removed.
• Incorporate natural drainage features whenever possible, using adequate buffers
and protecting areas where flow enters the drainage system.
• Minimize slope length and steepness.
• Reduce runoff velocities to prevent channel erosion.
• Prevent the tracking of sediment off-site.
• Select appropriate BMPs for the control of pollutants in addition to sediment.
• Be realistic about the limitations of BMPs specified and the operation and
maintenance of those BMPs. Anticipate what may go wrong, how you can prevent it
from happening, and what will need to be done to fix it.
2.2 Step-by-Step Procedure
There are three basic steps in producing a Construction SWPPP:
• Step 1 - Data Collection
• Step 2 - Data Analysis
• Step 3 - Construction SWPPP Development and Implementation
Steps 1 and 2, described in more detail below, are intended for projects that must complete a full
SWPPP. Smaller projects below the thresholds indicated in Section 2.1 may prepare a short form
Construction SWPPP, consisting of a checklist and a plan view (see Appendix C).
2.2.1 Step 1 – Data Collection
Evaluate existing site conditions and gather information that will help develop the most effective
Construction SWPPP. The information gathered should be explained in the narrative and shown on
the drawings. Appendix A provides standard notes required on the drawing.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 125
• Topography - Prepare a topographic drawing of the site to show the existing contour
elevations at intervals of 1 to 5 feet depending upon the slope of the terrain.
• Drainage - Locate and clearly mark existing drainage ditches, swales, and patterns
on the drawing, including existing storm drain pipe systems. Mark location of site
runon and runoff on drawing.
• Soils - Identify and label soil type(s) and erodibility (low, medium, high). A
geotechnical investigation may be required since published soils information in the
City is very limited. Regardless of the availability of published soils information, the
project proponent is responsible for characterizing site soils for erosive potential.
• Ground Cover - Label existing vegetation on the drawing. Show such features as
tree clusters, grassy areas, and unique or sensitive vegetation. Unique vegetation
may include existing trees above a given diameter. The City of Auburn encourages
tree preservation where possible. In addition, indicate existing denuded or exposed
soil areas.
• Critical Areas - Delineate critical areas adjacent to or within the site on the drawing.
Such features as steep slopes, streams, floodplains, lakes, wetlands, sole source
aquifers, and geologic hazard areas, etc., should be shown. Delineate setbacks and
buffer limits for these features on the drawings. Other related jurisdictional
boundaries such as Shorelines Management and the Federal Emergency
Management Agency (FEMA) base floodplain should also be shown on the
drawings.
• Adjacent Areas - Identify existing buildings, roads, and facilities adjacent to or within
the project site on the drawings. Identify existing and proposed utility locations,
construction clearing limits, and erosion and sediment control BMPs on the drawings.
• Existing Encumbrances - Identify wells, existing and abandoned septic drain fields,
utilities, easements, and site constraints.
• Precipitation Records - Determine the average monthly rainfall and rainfall intensity
for the required design storm events.
2.2.2 Step 2 – Data Analysis
Consider the data collected in Step 1 to visualize potential problems and limitations of the site.
Determine those areas that have critical erosion hazards. The following are some important factors to
consider in data analysis:
• Topography - The primary topographic considerations are slope steepness and
slope length. The longer and steeper the slope, the greater the erosion potential.
Erosion potential should be determined by a qualified engineer, soil professional, or
certified erosion control specialist. Measures to decrease erosion potential shall be
considered.
• Drainage - Natural drainage patterns that consist of overland flow, swales, and
depressions should be used to convey runoff through the site to avoid construction of
an artificial drainage system. Man-made ditches and waterways will become part of
the erosion problem if they are not properly stabilized. Care should be taken to
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 126
ensure that increased runoff from the site will not erode or flood the existing natural
drainage system. Possible sites for temporary surface water retention and detention
should be considered at this point.
• Direct construction site runoff away from saturated soil areas where groundwater
may be encountered and critical areas where drainage will concentrate. Preserve
natural drainage patterns on the site.
• Soils - Evaluate soil properties such as surface and subsurface runoff
characteristics, depth to impermeable layer, depth to seasonal groundwater table,
permeability, shrink-swell potential, texture, settleability, and erodibility. Develop the
Construction SWPPP based on known soil characteristics. Infiltration sites should be
properly protected from clay and silt which will reduce infiltration capacities.
• Ground Cover - Ground cover is the most important factor in terms of preventing
erosion. Existing vegetation that can be saved will prevent erosion better than
constructed BMPs. Trees and other vegetation protect the soil structure. Disturb as
little of the site as required to construct proposed improvements. If the existing
vegetation cannot be saved, consider such practices as phasing of construction,
temporary seeding, and mulching. Phasing of construction involves stabilizing one
part of the site before disturbing another. In this way, the entire site is not disturbed
at once.
• Critical Areas - Critical areas may include flood hazard areas, mine hazard areas,
slide hazard areas, sole source aquifers, wetlands, stream banks, fish-bearing
streams, and other water bodies. Any critical areas within or adjacent to the
development shall be a key consideration on land development decisions. Critical
areas and their buffers shall be delineated on the drawings and clearly flagged in the
field. Critical areas identified by the City of Auburn are available from the Planning,
Building & Community Department. Orange plastic fencing may be more useful than
flagging to assure that equipment operators stay out of critical areas. Only
unavoidable work should take place within critical areas and their buffers. Such
unavoidable work will require special BMPs, permit restrictions, and mitigation plans.
• Adjacent Areas - An analysis of adjacent properties should focus on areas upslope
and down slope from the construction project. Water bodies that will receive direct
runoff from the site are a major concern. Investigate and identify runon to the site.
The types, values, and sensitivities of and risks to downstream resources, such as
private property, stormwater facilities, public infrastructure, or aquatic systems,
should be evaluated. Develop a plan to route runon around areas disturbed by
construction. Erosion and sediment controls should be selected accordingly.
• Precipitation Records - Refer to Volume III to determine the required rainfall
records and the method of analysis for design of BMPs.
• Timing of the Project - An important consideration in selecting BMPs is the timing
and duration of the project. Projects that will proceed during the wet season and
projects that will last through several seasons must take all necessary precautions to
remain in compliance with the water quality standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 127
2.2.3 Step 3 – Construction SWPPP Development and Analysis
The Construction SWPPP consists of two parts: a narrative and the drawings. This section describes
the contents of the narrative and the drawings. The Department of Ecology has prepared a SWPPP
template that offers a quick and convenient means for developing a SWPPP for development and
redevelopment projects in the City of Auburn. This template can be found on Ecology’s website at:
http://www.ecy.wa.gov/programs/wq/stormwater/construction/
NOTE: Ensure that BMP numbers and references match the City SWMM when using the Ecology
template.
2.2.3.1 Construction SWPPP Narrative
The following topic headings shall be used, at a minimum, when preparing the Construction SWPPP
narrative.
• Project Description – Describe the nature and purpose of the construction project.
Include the total size of the area, any increase in existing impervious area; the total
area expected to be disturbed by clearing, grading, excavation or other construction
activities, including off-site borrow and fill areas; and the volumes of grading, cut and
fill that are proposed.
• Existing Site Conditions – Describe the existing topography, vegetation, and
drainage (including runon and runoff). Include a description of any structures or
development on the parcel including the area of existing impervious surfaces.
• Adjacent Areas – Describe adjacent areas, including streams, lakes, wetlands,
residential areas, and roads that might be affected by the construction project.
Provide a description of the downstream drainage leading from the site to the
receiving body of water.
• Critical Areas – Describe areas on or adjacent to the site that are classified as
critical areas. Critical areas that receive runoff from the site shall be described up to
¼ mile away. The distance may be increased by the City if special downstream
critical areas exist. Describe special requirements for working near or within these
areas. Critical areas identified by the City of Auburn from the Planning, Building &
Community Department. Critical areas not identified on the website still require
consideration.
• Soils – Describe the soils on the site, giving such information as soil names,
mapping unit, erodibility, settleability, permeability, depth, texture, and soil structure.
• Potential Erosion Problem Areas – Describe areas on the site that have potential
erosion problems.
• Construction Stormwater Pollution Prevention Elements – Describe how the
Construction SWPPP addresses each of the 12 required elements. Include the type
and location of BMPs used to satisfy the required element. If an element is not
applicable to a project, provide a written justification for why it is not necessary.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Developing a Construction Stormwater Volume II
Pollution Prevention Plan (SWPPP) Chapter 2 128
• Construction Phasing – Describe the intended sequence and timing of construction
activities.
• Construction Schedule – Describe the construction schedule. If the schedule
extends into the wet season, describe what activities will continue during the wet
season and how the transport of sediment from the construction site to receiving
waters will be prevented.
• Financial/Ownership Responsibilities – Describe ownership and obligations for
the project. Include bond forms and other evidence of financial responsibility for
environmental liabilities associated with construction.
• Engineering Calculations – Attach any calculations made for the design of BMPs
such as sediment ponds, diversions, and waterways, as well as calculations for
runoff and stormwater detention design (if applicable). Engineering calculations must
bear the signature and stamp of an engineer licensed in the state of Washington.
Provide references for all variables used and clearly state any assumptions.
2.2.3.2 Erosion and Sediment Control Drawings
See the City of Auburn Engineering Design Standard 3.04 for plan sheet requirements.
2.3 Construction SWPPP Checklists
The following checklists provide a tool to the applicant to determine if all the major items are included
in the Construction SWPPP. The checklist will be used by reviewers to determine that SWPPPs meet
all requirements and are complete. Applicants are encouraged to complete and submit this form with
their application.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction Stormwater Pollution Volume II
Prevention Plan Checklist Chapter 2 129
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
Address:
Parcel No.: ______________ Section: _________ Township: __________ Range: ________
City Reference/Permit No.:
Responsible Parties: Owner:__________________ Engineer:_____________________
Section I – Construction SWPPP Narrative
1. Project Description
A. Total project area.
B. Total proposed impervious area.
C. Total proposed area to be disturbed, including off-site borrow and fill areas.
D. Total volumes of proposed cut and fill.
2. Existing Site Conditions
A. Description of the existing topography.
B. Description of the existing vegetation.
C. Description of the existing drainage.
3. Adjacent Areas
A. Description of adjacent areas which may be affected by site disturbance
1. Streams
2. Lakes
3. Wetlands
4. Residential areas
5. Roads
6. Ditches, pipes, culverts
7. Other
B. Description of the downstream drainage path leading from the site to the receiving
body
of water (minimum distance of ¼ mile.)
4. Critical Areas
A. Description of critical areas that are on or adjacent to the site.
B. Description of special requirements for working in or near critical areas.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction Stormwater Pollution Volume II
Prevention Plan Checklist Chapter 2 130
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
Address: Parcel No:
City Reference/Permit No.:
5. Soils
Description of on-site soils.
1. Soil name(s)
2. Soil mapping unit
The following information may be required:
• Erodibility
• Settleability
• Permeability
• Depth
• Texture
• Soil structure
6. Potential Erosion Problem Areas
Description of potential erosion problems on site.
7. Construction Stormwater Pollution Prevention Elements
A. Describe how each of the Construction Stormwater Pollution Prevention Elements
has
been addressed though the Construction SWPPP.
B. Identify the type and location of BMPs used to satisfy the required element.
C. Written justification identifying the reason an element is not applicable to the proposal.
12 Required Elements - Construction Stormwater Pollution Prevention Plan:
1. Mark Clearing Limits
2. Establish Construction Access
3. Control Flow Rates
4. Install Sediment Controls
5. Stabilize Soils
6. Protect Slopes
7. Protect Drain Inlets
8. Stabilize Channels and Outlets
9. Control Pollutants
10. Control Dewatering
11. Maintain BMPs
12. Manage the Project
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction Stormwater Pollution Volume II
Prevention Plan Checklist Chapter 2 131
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
Address: Parcel No:
City Reference/Permit No.:
8. Construction Phasing
A. Construction sequence
B. Construction phasing (if proposed)
9. Construction Schedule
A. Provide a proposed construction schedule.
B. Wet Season Construction Activities
1. Proposed wet season construction activities.
2. Proposed wet season construction restraints for environmentally
sensitive/critical areas.
10. Financial/Ownership Responsibilities
A. Identify the property owner responsible for the initiation of bonds and/or other financial
securities.
B. Describe bonds and/or other evidence of financial responsibility for liability associated
with erosion and sedimentation impacts.
C. Maintenance bond.
11. Engineering Calculations
Provide Design Calculations.
1. Sediment ponds/traps
2. Diversions
3. Waterways
4. Runoff/stormwater detention calculations
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction Stormwater Pollution Volume II
Prevention Plan Checklist Chapter 2 132
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
Address: Parcel No.:
City Reference/Permit No.:
Responsible Parties: Owner:___________________ Engineer:_________________
Section II - Erosion and Sediment Control Drawings
1. General
A. Vicinity map with roads and waters of the state within one mile of the site.
B. Address, Parcel Number, and Street names labels
C. Erosion and Sediment Control Notes
2. Site Plan
A. Legal description of subject property.
B. North Arrow
C. Indicate boundaries of existing vegetation, e.g. tree lines, pasture areas, etc.
D. Identify and label areas of potential erosion problems.
E. Identify any on-site or adjacent surface waters, critical areas and associated buffers.
F. Identify FEMA base flood boundaries and Shoreline Management boundaries
(if applicable).
G. Show existing and proposed contours.
H. Indicate drainage basins and direction of flow for individual drainage areas.
I. Label final grade contours and identify developed condition drainage basins.
J. Delineate areas that are to be cleared and graded.
K. Show all cut and fill slopes indicating top and bottom of slope catch lines.
3. Conveyance Systems
A. Designate locations for swales, interceptor trenches, or ditches.
B. Show all temporary and permanent drainage pipes, ditches, or cut-off trenches required
for erosion and sediment control.
C. Provide minimum slope and cover for all temporary pipes or call out pipe inverts.
D. Show grades, dimensions, and direction of flow in all ditches, swales, culverts and
pipes.
E. Provide details for bypassing offsite runoff around disturbed areas.
F. Indicate locations and outlets of any dewatering systems.
4. Location of Detention BMPs
Identify location of detention BMPs.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction Stormwater Pollution Volume II
Prevention Plan Checklist Chapter 2 133
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
Address: Parcel No.:
City Reference/Permit No.:
5. Erosion and Sediment Control Facilities
Show the locations of all ESC facilities with dimensions and details as appropriate.
6. Detailed Drawings
Any best management practices used that are not referenced in the SWMM should be
explained and illustrated with detailed drawings.
7. Other Pollutant BMPs
Indicate on the site plan the location of BMPs to be used for the control of pollutants
other than sediment, e.g. concrete wash water.
8. Monitoring Locations
Indicate on the site plan the water quality sampling locations to be used for monitoring
water quality on the construction site, if applicable.
Describe inspection reporting responsibility, documentation, and filing.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 134
Chapter 3 Standards and Specifications for Best
Management Practices (BMPs)
BMPs are defined as schedules of activities, prohibitions of practices, maintenance procedures, and
structural and/or managerial practices, that when used singly or in combination, prevent or reduce the
release of pollutants to waters of Washington State. This chapter contains standards and
specifications for temporary BMPs to be used as applicable during the construction phase of a
project.
Section 3.1 contains the standards and specifications for Source Control BMPs specific to
construction operations.
Section 3.2 contains the standards and specifications for Runoff Conveyance and Treatment BMPs.
The standards for each individual BMP are divided into four sections:
1. Purpose
2. Conditions of Use
3. Design and Installation Specifications
4. Maintenance Standards
Note that the “Conditions of Use” always refers to site conditions. As site conditions change, BMPs
must be changed to remain in compliance.
Information on stream bank stabilization is available in the Integrated Streambank Protection
Guidelines, Washington State Department of Fish and Wildlife, 2003.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 135
3.1 Source Control BMPs
3.1.1 BMP C101: Preserving Natural Vegetation
3.1.1.1 Purpose
The purpose of preserving natural vegetation is to reduce erosion wherever practicable. Limiting site
disturbance is the single most effective method for reducing erosion. For example, conifers can hold
up to about 50 percent of all rain that falls during a storm. Up to 20-30 percent of this rain may never
reach the ground but is taken up by the tree or evaporates. Another benefit is that the rain held in the
tree can be released slowly to the ground after the storm.
3.1.1.2 Conditions of Use
Natural vegetation should be preserved on steep slopes, near perennial and intermittent
watercourses or swales, in wooded areas, and any other location practicable.
3.1.1.3 Design and Installation Specifications
Natural vegetation can be preserved in natural clumps or as individual trees, shrubs and vines.
The preservation of individual plants is more difficult because heavy equipment is generally used to
remove unwanted vegetation. The points to remember when attempting to save individual plants are:
• Is the plant worth saving? Consider the location, species, size, age, vigor, and the
work involved. The City of Auburn encourages the preservation of natural vegetation
and trees.
• Fence or clearly mark areas around trees that are to be saved. Keep ground
disturbance away from the trees as far out as the dripline (at a minimum).
Plants need protection from three kinds of injuries:
• Construction Equipment - This injury can be above or below the ground level.
Damage results from scarring, cutting of roots, and compaction of the soil. Placing a
fenced buffer zone around plants to be saved prior to construction can prevent
construction equipment injuries.
• Grade Changes - Changing the natural ground level will alter grades, which affects
the plant's ability to obtain the necessary air, water, and minerals. Minor fills usually
do not cause problems although sensitivity between species does vary and should
be checked. Trees can tolerate fill of 6 inches or less. For shrubs and other plants,
the fill should be less.
When there are major changes in grade, it may become necessary to supply air to the roots
of plants. This can be done by placing a layer of gravel and a tile system over the roots
before the fill is made. A tile system protects a tree from a raised grade. The tile system
should be laid out on the original grade leading from a dry well around the tree trunk. The
system should then be covered with small stones to allow air to circulate over the root area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 136
Lowering the natural ground level can seriously damage trees and shrubs. The highest
percentage of the plant roots are in the upper 12 inches of the soil and cuts of only 2-3 inches
can cause serious injury. To protect the roots, it may be necessary to terrace the immediate
area around the plants to be saved. If roots are exposed, construction of retaining walls may
be needed to keep the soil in place. Plants can also be preserved by leaving them on an
undisturbed, gently sloping mound. To increase the chances for survival, it is best to limit
grade changes and other soil disturbances to areas outside the dripline of the plant.
• Excavations - Protect trees and other plants when excavating for drainfields, power,
water, and sewer lines. Where possible, route the trenches around trees and large
shrubs. When this is not possible, it is best to tunnel under them. This can be done
with hand tools or power augers. If it is not possible to route the trench around plants
to be saved, then the following methods should be observed:
o Cut as few roots as possible. When you have to cut, cut clean. Paint cut root
ends with a wood dressing like asphalt base paint.
o Backfill the trench as soon as possible.
o Tunnel beneath root systems as close to the center of the main trunk as
possible to preserve most of the important feeder roots.
Some problems that can be encountered with a few specific trees are:
• Maple, Dogwood, Red alder, Western hemlock, Western red cedar, and Douglas fir
do not readily adjust to changes in environment and special care should be taken to
protect these trees.
• The windthrow hazard of Pacific silver fir and madrona is high, while that of Western
hemlock is moderate. The danger of windthrow increases where dense stands have
been thinned. Other species (unless they are in shallow, wet soils less than
20 inches deep) have a low windthrow hazard.
• Cottonwoods, maples, and willows have water-seeking roots. These species thrive in
high moisture conditions that other trees would not. Roots of these plants can cause
problems in sewer lines and infiltration fields.
• Thinning operations in pure or mixed stands of Grand fir, Pacific silver fir, Noble fir,
Sitka spruce, Western red cedar, Western hemlock, Pacific dogwood, and Red alder
can cause serious disease problems. Disease can become established through
damaged limbs, trunks, roots, and freshly cut stumps. Diseased and weakened trees
are also susceptible to insect attack.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 137
3.1.1.4 Maintenance Standards
• Inspect flagged and/or fenced areas regularly to make sure flagging or fencing has
not been removed or damaged. If the flagging or fencing has been damaged or
visibility reduced, it shall be repaired or replaced immediately and visibility restored.
• If tree roots have been exposed or injured, “prune” cleanly with an appropriate
pruning saw or loppers directly above the damaged roots and recover with native
soils. Treatment of sap flowing trees (fir, hemlock, pine, soft maples) is not advised
as sap forms a natural healing barrier.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 138
3.1.2 BMP C102: Buffer Zone
3.1.2.1 Purpose
An undisturbed area or strip of natural vegetation or an established suitable planting that will provide
a living filter to reduce soil erosion and runoff velocities.
3.1.2.2 Conditions of Use
Natural buffer zones are used along streams, wetlands and other bodies of water that need
protection from erosion and sedimentation. Vegetative buffer zones can be used to protect natural
swales and can be incorporated into the natural landscaping of an area.
Critical-areas buffer zones should not be used as sediment treatment areas. Do not disturb critical
area buffers. The City may expand the buffer widths temporarily to allow the use of the expanded
area for removal of sediment.
3.1.2.3 Design and Installation Specifications
• Preserve natural vegetation or plantings in clumps, blocks, or strips as this is
generally the easiest and most successful method. However, single specimen trees
and plants should also be preserved.
• Leave all unstable slopes in their natural, undisturbed state.
• Mark clearing limits and keep all equipment and construction debris out of the natural
areas. Steel construction fencing is the most effective method of protecting sensitive
areas and buffers. Alternatively, wire-backed silt fence on steel posts is marginally
effective. Flagging alone is typically not effective and will not be allowed.
• Keep all excavations outside the dripline of trees and shrubs.
• Do not push debris or extra soil into the buffer zone area because it will cause
damage from burying and smothering.
• Vegetative buffer zones for streams, lakes or other waterways shall be established
by the City or other state or federal permits or approvals.
3.1.2.4 Maintenance Standards
• Inspect the area frequently to make sure flagging remains in place and the area
remains undisturbed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 139
3.1.3 BMP C103: High Visibility Plastic or Metal Fence
3.1.3.1 Purpose
Fencing is intended to:
• Restrict clearing to approved limits.
• Prevent disturbance of sensitive areas, their buffers, and other areas required to be
left undisturbed.
• Limit construction traffic to designated construction entrances or roads.
• Protect areas where marking with survey tape may not provide adequate protection.
3.1.3.2 Conditions of Use
To establish clearing limits, plastic or metal fence may be used:
• At the boundary of sensitive areas, their buffers, and other areas required to be left
uncleared.
• As necessary to control vehicle access to and on the site.
3.1.3.3 Design and Installation Specifications
• High visibility plastic fence shall be composed of a high-density polyethylene material
and shall be at least four feet in height. Posts for the fencing shall be steel or wood
and placed every 6 feet on center (maximum) or as needed to ensure rigidity. The
fencing shall be fastened to the post every six inches with a polyethylene tie. On long
continuous lengths of fencing, a tension wire or rope shall be used as a top stringer
to prevent sagging between posts. See City of Auburn Construction Standards for
high visibility fence specifications.
• Design and install metal fences according to the manufacturer's specifications.
• Metal fences shall be at least 3 feet high and must be highly visible.
• Do not wire or staple fences to trees.
3.1.3.4 Maintenance Standards
• If the fence has been damaged or visibility reduced, it shall be repaired or replaced
immediately and visibility restored.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 140
3.1.4 BMP C104: Stake and Wire Fence
3.1.4.1 Purpose
Fencing is intended to:
• Restrict clearing to approved limits.
• Prevent disturbance of sensitive areas, their buffers, and other areas required to be
left undisturbed.
• Limit construction traffic to designated construction entrances or roads.
• Protect areas where marking with survey tape may not provide adequate protection.
3.1.4.2 Conditions of Use
To establish clearing limits, stake or wiring fence may be used:
• At the boundary of sensitive areas, their buffers, and other areas required to be left
uncleared.
• As necessary to control vehicle access to and on the site.
3.1.4.3 Design and Installation Specifications
• See Figure II-3-1 for details.
• Use more substantial fencing if the fence does not prevent encroachment into those
areas that are not to be disturbed.
3.1.4.4 Maintenance Standards
• If the fence has been damaged or visibility reduced, it shall be repaired or replaced
immediately and visibility restored.
Figure II-3-1. Stake and Wire Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 141
3.1.5 BMP C105: Stabilized Construction Entrance
3.1.5.1 Purpose
Construction entrances are stabilized to reduce the amount of sediment transported onto paved
roads by vehicles or equipment by constructing a stabilized pad of quarry spalls at entrances to
construction sites.
3.1.5.2 Conditions of Use
Construction entrances shall be stabilized wherever traffic will be leaving a construction site and
traveling on paved roads or other paved areas within 1,000 feet of the site.
On large commercial, highway, and road projects, the designer should include enough extra
materials in the contract to allow for additional stabilized entrances not shown in the initial
Construction SWPPP. It is difficult to determine exactly where access to these projects will take
place; additional materials will enable the contractor to install them where needed.
3.1.5.3 Design and Installation Specifications
• See Figure II-3-2 for details.
NOTE: Reduce the length of the entrance to the maximum practicable size when the size or
configuration of the site does not allow the full 100-foot length.
• Place a separation geotextile under the spalls to prevent fine sediment from pumping
up into the rock pad. The geotextile shall meet the following standards:
o Grab Tensile Strength (ASTM D4751) – 200 psi min.
o Grab Tensile Elongation (ASTM D4632) – 30% max.
o Mullen Burst Strength (ASTM D3786-80a) – 400 psi min.
o AOS (ASTM D4751) – 20 to 45 (U.S. standard sieve size)
• Consider early installation of the first lift of asphalt in areas that will be paved; this
can be used as a stabilized entrance. Also consider the installation of excess
concrete as a stabilized entrance. During large concrete pours, excess concrete is
often available for this purpose.
• Install fencing (see BMPs C103 and C104) as necessary to restrict traffic to the
construction entrance.
• Whenever possible, construct the entrance on a firm, compacted subgrade. This can
substantially increase the effectiveness of the pad and reduce the need for
maintenance.
3.1.5.4 Maintenance Standards
• Add quarry spalls if the pad is no longer in accordance with the specifications.
• If the entrance is not preventing sediment from being tracked onto pavement, then
alternative measures to keep the streets free of sediment shall be used. This may
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 142
include street sweeping, an increase in the dimensions of the entrance, or the
installation of a wheel wash.
• No tracking of sediment onto the roadway is allowed. If sediment is tracked onto the
road, clean the road thoroughly by shoveling or pickup sweeping. Transport
sediment to a controlled sediment disposal area.
• Keep streets clean at ALL times. Clean tracked sediment immediately.
• Street washing of sediment to the storm drain system is not allowed.
• Immediately remove any quarry spalls that are loosened from the pad and end up on
the roadway.
• Install fencing (BMPs C103 and C104) to control traffic if vehicles are entering or
exiting the site at points other than the construction entrance(s).
• Upon project completion and site stabilization, permanently stabilize all construction
accesses intended as permanent access for maintenance.
Figure II-3-2. Stabilized Construction Entrance
Figure II-3-3 shows a small site, stabilized construction entrance.
1
0
0'
MI
N
.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 143
Figure II-3-3. Small-Site Stabilized Construction Entrance
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 144
3.1.6 BMP C106: Wheel Wash
3.1.6.1 Purpose
Wheel washes reduce the amount of sediment transported onto paved roads by motor vehicles.
3.1.6.2 Conditions of Use
Can be used when a stabilized construction entrance (see BMP C105) is not preventing sediment
from being tracked onto pavement.
• Wheel washing is generally an effective BMP when installed with careful attention to
topography. For example, a wheel wash can be detrimental if installed at the top of a
slope abutting a right-of-way where the water from the dripping truck can run
unimpeded into the street.
• Pressure washing combined with an adequately sized and surfaced pad with direct
drainage to a large 10-foot x 10-foot sump can be very effective.
3.1.6.3 Design and Installation Specifications
Suggested details are shown in Figure II-3-4. The City may allow other designs. A minimum of
6 inches of asphalt treated base (ATB) over crushed base material or 8 inches over a good subgrade
is recommended to pave the wheel wash.
Use a low clearance truck to test the wheel wash before paving. Either a belly dump or lowboy will
work well to test clearance.
Keep the water level from 12 to 14 inches deep to avoid damage to truck hubs and filling the truck
tongues with water.
Midpoint spray nozzles are only needed in extremely muddy conditions.
Design wheel wash systems with a small grade change, 6 to 12 inches for a 10-foot-wide pond, to
allow sediment to flow to the low side of pond to help prevent re-suspension of sediment. A drainpipe
with a 2- to 3-foot riser should be installed on the low side of the pond to allow for easy cleaning and
refilling. Polymers may be used to promote coagulation and flocculation in a closed-loop system.
Polyacrylamide (PAM) added to the wheel wash water at a rate of 0.25 - 0.5 pounds per
1,000 gallons of water increases effectiveness and reduces cleanup time. If PAM is already being
used for dust or erosion control and is being applied by a water truck, the same truck can be used to
change the wash water.
3.1.6.4 Maintenance Standards
The wheel wash should start out the day with fresh water.
The wash water should be changed a minimum of once per day. On large earthwork jobs where
more than 10 to 20 trucks per hour are expected, the wash water will need to be changed more
often.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 145
Wheel wash or tire bath wastewater shall be discharged to a separate on-site treatment system, such
as closed-loop recirculation or land application, or to the sanitary sewer with a King County – Metro
wastewater discharges from construction sites permit.
Figure II-3-4. Wheel Wash
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 146
3.1.7 BMP C107: Construction Road/Parking Area Stabilization
3.1.7.1 Purpose
Stabilizing subdivision roads, parking areas and other onsite vehicle transportation routes
immediately after grading reduces erosion caused by construction traffic or runoff.
3.1.7.2 Conditions of Use
• Stabilize roads or parking areas wherever they are constructed, whether permanent
or temporary, for use by construction traffic.
• Install fencing (see BMPs C103 and C104), if necessary, to limit the access of
vehicles to only those roads and parking areas that are stabilized.
3.1.7.3 Design and Installation Specifications
• On areas that will receive asphalt as part of the project, install the first lift as soon as
possible.
• Apply a 6-inch depth of 2- to 4-inch crushed rock, gravel base, or crushed surfacing
base course immediately after grading or utility installation. A 4-inch course of
asphalt treated base (ATB) may also be used, or the road/parking area may be
paved. It may also be possible to use cement or calcium chloride for soil stabilization.
If cement or cement kiln dust is used for roadbase stabilization, pH monitoring and
BMPs are necessary to evaluate and minimize the effects on stormwater. If the area
will not be used for permanent roads, parking areas, or structures, a 6-inch depth of
hog fuel may also be used, but this is likely to require more maintenance. Whenever
possible, place construction roads and parking areas on a firm, compacted
subgrade.
• Temporary road gradients shall not exceed 15 percent. Carefully grade roadways to
drain. Provide drainage ditches on each side of the roadway in the case of a
crowned section, or on one side in the case of a super-elevated section. Direct
drainage ditches to a sediment control BMP.
• Rather than relying on ditches, it may also be possible to grade the road so that
runoff sheet-flows into a heavily vegetated area with a well-developed topsoil.
Landscaped areas are not adequate. If this area has at least 50 feet of vegetation,
then it is generally preferable to use the vegetation to treat runoff, rather than a
sediment pond or trap. The 50 feet shall not include wetlands. If runoff is allowed to
sheetflow through adjacent vegetated areas, it is vital to design the roadways and
parking areas so that no concentrated runoff is created.
• Protect storm drain inlets to prevent sediment-laden water entering the storm drain
system (see BMP C220).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 147
3.1.7.4 Maintenance Standards
• Inspect stabilized areas regularly, especially after large storm events.
• Add crushed rock, gravel base, hog fuel, etc. as required to maintain a stable driving
surface and to stabilize any eroded areas.
• Following construction, restore all areas to preconstruction condition or better to
prevent future erosion.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 148
3.1.8 BMP C120: Temporary and Permanent Seeding
3.1.8.1 Purpose
Seeding is intended to reduce erosion by stabilizing exposed soils. A well-established vegetative
cover is one of the most effective methods of reducing erosion.
3.1.8.2 Conditions of Use
• Seeding may be used throughout the project on disturbed areas that have reached
final grade or that will remain unworked for more than 30 days.
• Channels that will be vegetated should be installed before major earthwork and
hydroseeded with a Bonded Fiber Matrix. The vegetation should be well established
(i.e., 75 percent cover) before water is allowed to flow in the ditch. With channels that
will have high flows, install erosion control blankets over the hydroseed. If vegetation
cannot be established from seed before water is allowed in the ditch, sod should be
installed in the bottom of the ditch over hydromulch and blankets.
• Seed retention/detention ponds as required.
• Mulch is required at all times because it protects seeds from heat, moisture loss, and
transport due to runoff.
• All disturbed areas shall be reviewed in late August to early September and all
seeding shall be completed by the end of September. Otherwise, vegetation will not
establish itself enough to provide more than average protection.
• At final site stabilization, seed and mulch all disturbed areas not otherwise vegetated
or stabilized. Final stabilization means the completion of all soil disturbing activities at
the site and the establishment of a permanent vegetative cover, or equivalent
permanent stabilization measures (such as pavement, riprap, gabions, or
geotextiles) which will prevent erosion.
3.1.8.3 Design and Installation Specifications
• Seed during seasons most conducive to plant growth. The optimum seeding
windows for western Washington are April 1 through June 30 and September 1
through October 1. Seeding that occurs between July 1 and August 30 will require
irrigation until 75 percent grass cover is established. Seeding that occurs between
October 1 and March 30 will require a mulch or plastic cover until 75 percent grass
cover is established.
• Deviation from these specifications shall be allowed if alternatives are developed by
a licensed Landscape Professional and approved by the City.
• To prevent seed from being washed away, confirm that all required surface water
control measures have been installed.
• The seedbed should be firm and rough. All soil should be roughened no matter what
the slope. If compaction is required for engineering purposes, track walk slopes
before seeding. Backblading or smoothing of slopes greater than 4:1 is not allowed if
they are to be seeded.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 149
• New and more effective restoration-based landscape practices rely on deeper
incorporation than that provided by a simple single-pass rototilling treatment.
Wherever practical, the subgrade should be initially ripped to improve long-term
permeability, infiltration, and water inflow qualities. At a minimum for permanent
areas, use soil amendments to achieve organic matter and permeability performance
defined in engineered soil/landscape systems. For systems that are deeper than
8 inches, complete the rototilling process in multiple lifts, or prepare the soil system
properly and then place it to achieve the specified depth.
• Organic matter is the most appropriate form of “fertilizer” because it provides
nutrients (including nitrogen, phosphorus, and potassium) in the least water-soluble
form. A natural system typically releases 2-10 percent of its nutrients annually.
Chemical fertilizers have since been formulated to simulate what organic matter does
naturally.
• In general, 10-4-6 N-P-K (nitrogen-phosphorus-potassium) fertilizer can be used at a
rate of 90 pounds per acre. Always use slow-release fertilizers because they are
more efficient and have fewer environmental impacts. It is recommended that soils
tests are conducted in areas being seeded for final landscaping to determine the
exact type and quantity of fertilizer needed. This will prevent the over-application of
fertilizer. Fertilizer should not be added to the hydromulch machine and agitated
more than 20 minutes before it is to be used. If agitated too much, the slow-release
coating is destroyed.
• There are numerous products available on the market that take the place of chemical
fertilizers. These include several with seaweed extracts that are beneficial to soil
microbes and organisms. If 100 percent cottonseed meal is used as the mulch in
hydroseed, chemical fertilizer may not be necessary. Cottonseed meal is a good
source of long-term, slow-release, available nitrogen.
• Hydroseed applications shall include a minimum of 1,500 pounds per acre of mulch
with 3 percent tackifier. Mulch may be made up of 100 percent: cottonseed meal;
fibers made of wood, recycled cellulose, hemp, and kenaf; compost; or blends of
these. Tackifier shall be plant-based, such as guar or alpha plantago, or chemical-
based such as polyacrylamide or polymers. Any mulch or tackifier product used shall
be installed per manufacturer’s instructions. Generally, mulches come in 40-
50 pound bags. Seed and fertilizer are added at time of application.
• Mulch is always required for seeding. Mulch can be applied on top of the seed or
simultaneously by hydroseeding.
• On steep slopes, Bonded Fiber Matrix (BFM) or Mechanically Bonded Fiber Matrix
(MBFM) products should be used. BFM/MBFM products are applied at a minimum
rate of 3,000 pounds per acre of mulch with approximately 10 percent tackifier.
Application is made so that a minimum of 95 percent soil coverage is achieved.
Numerous products are available commercially and should be installed per
manufacturer’s instructions. Most products require 24 to 36 hours to cure before a
rainfall and cannot be installed on wet or saturated soils. Generally, these products
come in 40 to 50 pound bags and include all necessary ingredients except for seed
and fertilizer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 150
• BFMs and MBFMs have some advantages over blankets:
o No surface preparation required;
o On slopes steeper than 2.5:1, blanket installers may need to be roped and
harnessed for safety;
• In most cases, the shear strength of blankets is not a factor when used on slopes,
only when used in channels. BFMs and MBFMs are good alternatives to blankets in
most situations where vegetation establishment is the goal.
• When installing seed via hydroseeding operations, only about 1/3 of the seed
actually ends up in contact with the soil surface. This reduces the ability to establish
a good stand of grass quickly. One way to overcome this is to increase seed
quantities by up to 50 percent.
• Vegetation establishment can also be enhanced by dividing the hydromulch
operation into two phases:
o Phase 1- Install all seed and fertilizer with 25 to 30 percent mulch and
tackifier onto soil in the first lift;
o Phase 2- Install the rest of the mulch and tackifier over the first lift.
• An alternative is to install the mulch, seed, fertilizer, and tackifier in one lift. Then,
spread or blow straw over the top of the hydromulch at a rate of about 800 to
1,000 pounds per acre. Hold straw in place with a standard tackifier. Both of these
approaches will increase cost moderately but will greatly improve and enhance
vegetative establishment. The increased cost may be offset by the reduced need for:
o Irrigation
o Reapplication of mulch
o Repair of failed slope surfaces
o This technique works with standard hydromulch (1,500 pounds per acre
minimum) and BFM/MBFMs (3,000 pounds per acre minimum).
• Provide a healthy topsoil to areas to be permanently landscaped. This will reduce the
need for fertilizers, improve overall topsoil quality, provide for better vegetal health
and vitality, improve hydrologic characteristics, and reduce the need for irrigation.
See the Post-Construction Soil Quality and Depth BMP in Volume VI for more
information. Areas that will be seeded only and not landscaped may need compost
or meal-based mulch included in the hydroseed in order to establish vegetation.
Replace native topsoil on the disturbed soil surface before application.
• Seed that is installed as a temporary measure may be installed by hand if it will be
covered by straw, mulch, or topsoil. Seed that is installed as a permanent measure
may be installed by hand on small areas (usually less than 1 acre) that will be
covered with mulch, topsoil, or erosion blankets. The seed mixes listed below include
recommended mixes for both temporary and permanent seeding. These mixes, with
the exception of the wetland mix, shall be applied at a rate of 120 pounds per acre.
This rate can be reduced if soil amendments or slow-release fertilizers are used.
Local suppliers or the local conservation district should be consulted for their
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 151
recommendations because the appropriate mix depends on a variety of factors,
including location, exposure, soil type, slope, and expected foot traffic. Alternative
seed mixes approved by the City of Auburn may be used.
• Table II-3-1 represents the standard mix for those areas where just a temporary
vegetative cover is required.
• Table II-3-2 provides just one recommended possibility for landscaping seed.
• The turf seed mix in Table II-3-3 is for dry situations. The advantage is that this mix
requires very little maintenance.
• Table II-3-4 presents a mix recommended for bioswales and other intermittently wet
areas.
• The seed mix shown in Table II-3-5 is a recommended low-growing, relatively non-
invasive seed mix appropriate for very wet areas that are not regulated wetlands.
Other mixes may be appropriate, depending on the soil type and hydrology of the
area. Recent research suggests that bentgrass (agrostis sp.) should be emphasized
in wet-area seed mixes. Apply this mixture at a rate of 60 pounds per acre.
• The meadow seed mix in Table II-3-6 is recommended for areas that will be
maintained infrequently or not at all and where colonization by native plants is
desirable. Likely applications include rural road and utility right-of-way. Seeding
should take place in September or very early October in order to obtain adequate
establishment prior to the winter months. The appropriateness of clover in the mix
may need to be considered, as this can be a fairly invasive species. If the soil is
amended, the addition of clover may not be necessary.
3.1.8.4 Maintenance Standards
• Reseed any seeded areas that fail to establish at least 80 percent cover within
6 weeks from the initial seeding (100 percent cover for areas that receive sheet or
concentrated flows). If reseeding is ineffective, use an alternate method, such as
sodding, mulching, or nets/blankets. If winter weather prevents adequate grass
growth, this time limit may be relaxed at the discretion of the City.
• After adequate cover is achieved, reseed and protect with mulch any areas that
experience erosion. If the erosion problem is drainage related, the problem shall be
fixed and the eroded area reseeded and protected by mulch.
• Water seeded areas if necessary. Watering shall not cause runoff.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 152
Table II-3-1. Temporary Erosion Control Seed Mix
% Weight % Purity % Germination
Chewings or annual bluegrass
Festuca rubra var. commutate or Poa anna 40 98 90
Perennial rye
Lolium perenne 50 98 90
Redtop or colonial bentgrass
Agrostis alba or Agrostis tenuis 5 92 85
White Dutch clover
Trifolium repens 5 98 90
Table II-3-2. Landscaping Seed Mix
% Weight % Purity % Germination
Perennial rye
Lolium perenne 70 98 90
Chewings and red fescue blend
Festuca rubra var commutate or Festuca rubra 30 98 90
Table II-3-3. Low-Growing Turf Seed Mix
% Weight % Purity % Germination
Dwarf tall fescue (several varieties)
Festuca arundinacea var. 45 98 90
Dwarf perennial rye (Barclay)
Lolium perenne var. barclay 30 98 90
Red fescue
Festuca rubra 20 98 90
Colonial bentgrass
Agrostis tenuis 5 98 90
Table II-3-4. Bioswale Seed Mix1
% Weight % Purity % Germination
Tall or meadow fescue
Festuca arundinacea or Festuca elatior 75-80 98 90
Seaside/Creeping bentgrass
Agrostis palustriis 1-15 92 85
Redtop bentgrass
Agrostis alba or Agrostis gigantea 5-10 90 80
1Modified Briargreen, Inc. Hydroseeding Guide Wetlands Seed Mix
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 153
Table II-3-5. Wet Area Seed Mix
% Weight % Purity % Germination
Tall or meadow fescue
Festuca arundinacea or Festuca elatior 60-70 98 90
Seaside/Creeping bentgrass
Agrostis palustriis 10-15 98 85
Meadow foxtail
Alepocurus pratensis 10-15 90 80
Alsike clover
Trifolium hybridium 1-6 98 90
Redtop bentgrass
Agrostis alba or Agrostis gigantea 106 92 85
Table II-3-6. Meadow Seed Mix
% Weight % Purity % Germination
Redtop or Oregon bentgrass
Agrostis alba or Agrostis oregonensis 20 92 85
Red fescue
Festuca rubra 70 98 90
White Dutch clover
Trifolium repens 10 98 90
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 154
3.1.9 BMP C121: Mulching
3.1.9.1 Purpose
The purpose of mulching soils is to provide immediate temporary protection from erosion. Mulch also
enhances plant establishment by conserving moisture, holding fertilizer, seed, and topsoil in place,
and moderating soil temperatures. There is an enormous variety of mulches that can be used. Only
the most common types are discussed in this section.
3.1.9.2 Conditions of Use
As a temporary cover measure, mulch should be used:
• On disturbed areas that require cover measures for less than 30 days.
• As a cover for seed during the wet season and during the hot summer months.
• During the wet season on slopes steeper than 3H:1V with more than 10 feet of
vertical relief.
• Mulch may be applied at any time of the year and must be refreshed periodically.
3.1.9.3 Design and Installation Specifications
For mulch materials, application rates, and specifications, see Table II-3-7.
NOTE: Thicknesses may be increased for disturbed areas in or near sensitive areas or other areas
highly susceptible to erosion.
Mulch used within the ordinary high-water mark of surface waters should be selected to minimize
potential flotation of organic matter. Composted organic materials have higher specific gravities
(densities) than straw, wood, or chipped material.
3.1.9.4 Maintenance Standards
• The thickness of the cover must be maintained.
• Re-mulch and/or protect with a net or blanket any areas that experience erosion. If
the erosion problem is drainage related, then fix the problem and remulch the eroded
area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 155
Table II-3-7. Mulch Standards and Guidelines
Mulch
Material
Quality
Standards
Application
Rates
Remarks
Straw Air-dried; free from
undesirable seed
and coarse material.
3” thick; 5
bales per
1000 sf or 2
to 3 tons per
acre.
Cost-effective protection when applied with adequate
thickness. Hand-application generally requires greater
thickness than blown straw. The thickness of straw may
be reduced by half when used in conjunction with seeding.
In windy areas, straw must be held in place by crimping,
using a tackifier, or covering with netting. Blown straw
always has to be held in place with a tackifier as even light
winds will blow it away. Straw, however, has several
deficiencies that should be considered when selecting
mulch materials. If often introduces and/or encourages the
propagation of weed species and it has no significant long-
term benefits. Straw should be used only if mulches with
long-term benefits are unavailable locally. It should also
not be used within the ordinary high-water elevation of
surface waters (due to flotation).
Hydro-
mulch
No growth inhibiting
factors.
Approx. 25-30
lbs per 1000
sf or 1500-
2000 lbs per
acre.
Shall be applied with hydromulcher. Shall not be used
without seed and tackifier unless the application rate is at
least doubled. Fibers longer than about ¾ - 1 inch clog
hydromulch equipment. Fibers should be kept to less than
¾ inch.
Composte
d Mulch
and
Compost
No visible water or
dust during
handling. Must be
purchased from
supplier with a Solid
Waste Handling
permit (unless
exempt)
3” thick, min.;
approx. 100
tons per acre
(approx. 800
lbs. per yard).
Mulch is excellent for protecting final grades until
landscaping because it can be directly seeded or tilled into
soil as an amendment. Composted mulch has a coarser
size gradation than compost. It is more stable and
practical to use in wet areas and during rainy weather
conditions.
Chipped
Site
Vegetation
Average size shall
be several inches.
Gradations from fine
to 6-inches in length
for texture, variation,
and interlocking
properties.
3” minimum
thickness
This is a cost-effective way to dispose of debris from
clearing and grubbing, and it eliminates the problems
associated with burning. Generally, it should not be used
on slopes above approx. 10% because of its tendency to
be transported by runoff. It is not recommended within 200
feet of surface waters. If seeding is expected shortly after
mulch, the decomposition of the chipped vegetation may
tie up nutrients important to grass establishment.
Wood-
based
mulch
No visible water or
dust during
handling. Must be
purchased from a
supplier with a Solid
Waste Handling
permit or one
exempt from solid
waste regulations.
3” thick;
approx. 100
tons per acre
(approx. 800
lbs. per yard).
This material is often called “hog” or “hogged fuel”. It is
usable as a material for Stabilized Construction Entrances
(BMP C105) and as a mulch. The use of mulch ultimately
improves the organic matter in the soil. Special caution is
advised regarding the source and composition of wood-
based mulches. Its preparation typically does not provide
any weed seed control, so evidence of residual vegetation
in its composition or known inclusion of weed plants or
seeds should be monitored and prevented (or minimized).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 156
3.1.10 BMP C122: Nets and Blankets
3.1.10.1 Purpose
Erosion control nets and blankets are intended to prevent erosion and hold seed and mulch in place
on steep slopes and in channels so that vegetation can become well established. In addition, some
nets and blankets can be used to reinforce turf permanently to protect drainage ways during high
flows. Nets (commonly called matting) are strands of material woven into an open, but high-tensile
strength net (for example, coconut fiber matting). Blankets are strands of material that are not tightly
woven, but instead form a layer of interlocking fibers, typically held together by a biodegradable or
photodegradable netting (for example, excelsior or straw blankets). They generally have lower tensile
strength than nets, but cover the ground more completely. Coir (coconut fiber) fabric comes as both
nets and blankets.
3.1.10.2 Conditions of Use
Erosion control nets and blankets should be used:
• To aid permanent vegetated stabilization of slopes 2H:1V or greater and with more
than 10 feet of vertical relief.
• For drainage ditches and swales (highly recommended). The application of
appropriate netting or blanket to drainage ditches and swales can protect bare soil
from channelized runoff while vegetation is established. Nets and blankets also can
capture a great deal of sediment due to their open, porous structure. Synthetic nets
and blankets can be used to stabilize channels permanently and may provide a cost-
effective, environmentally preferable alternative to riprap. 100 percent synthetic
blankets manufactured for use in ditches may be easily reused as temporary ditch
liners.
• Disadvantages of blankets include:
o Surface preparation required;
o On slopes steeper than 2.5:1, blanket installers may need to be roped and
harnessed for safety;
• Advantages of blankets include:
o Can be installed without mobilizing special equipment;
o Can be installed by anyone with minimal training;
o Can be installed in stages or phases as the project progresses;
o Seed and fertilizer can be hand-placed by the installers as they progress
down the slope;
o Can be installed in any weather;
o There are numerous types of blankets that can be designed with various
parameters in mind. Those parameters include: fiber blend, mesh strength,
longevity, biodegradability, cost, and availability.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 157
3.1.10.3 Design and Installation Specifications
• See Figure II-3-5 and Figure II-3-6 for typical orientation and installation of blankets
used in channels and as slope protection. Note: these are typical only; all blankets
must be installed per manufacturer’s installation instructions.
• Installation is critical to the effectiveness of these products. If good ground contact is
not achieved, runoff can concentrate under the product, resulting in significant
erosion.
Installation of Blankets on Slopes:
• Complete final grade and track walk up and down the slope.
• Install hydromulch with seed and fertilizer.
• Dig a small trench, approximately 12 inches wide by 6 inches deep along the top of
the slope.
• Install the leading edge of the blanket into the small trench and staple approximately
every 18 inches.
NOTE: Staples are metal. ”U”-shaped, and a minimum of 6 inches long. Longer staples are
used in sandy soils. Biodegradable stakes are also available and should be used where
applicable.
• Roll the blanket slowly down the slope as the installer walks backwards.
• NOTE: The blanket rests against the installer’s legs. Staples are installed as the blanket is
unrolled. It is critical that the proper staple pattern in used for the blanket being installed. The
blanket should not be allowed to roll down the slope on its own as this stretches the blanket,
making it impossible to maintain soil contact. In addition, no one should be allowed to walk on
the blanket after it is in place.
• If the blanket is not long enough to cover the entire slope length, the trailing edge of
the upper blanket should overlap the leading edge of the lower blanket and be
stapled. On steeper slopes, this overlap should be installed in a small trench,
stapled, and covered with soil.
• With the variety of products available, it is impossible to cover all the details of
appropriate use and installation. Therefore, it is critical that the design engineer
consults the manufacturer's information and that a site visit takes place in order to
insure that the product specified is appropriate. Information is also available at the
following websites:
o WSDOT: http://www.wsdot.wa.gov/eesc/environmental/
o Texas Transportation Institute:
http://www.dot.state.tx.us/insdtdot/orgchart/cmd/erosion/contents.htm
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 158
• Jute matting must be used in conjunction with mulch (BMP C121). Excelsior, woven
straw blankets, and coir (coconut fiber) blankets may be installed without mulch.
There are many other types of erosion control nets and blankets on the market that
may be appropriate in certain circumstances.
• In general, most nets (e.g., jute matting) require mulch in order to prevent erosion
because they have a fairly open structure. Blankets typically do not require mulch
because they usually provide complete protection of the surface.
• Extremely steep, unstable, wet, or rocky slopes are often appropriate candidates for
use of synthetic blankets, as are riverbanks, beaches, and other high-energy
environments. If synthetic blankets are used, the soil should be hydromulched first.
• 100 percent biodegradable blankets are available for use in sensitive areas. These
organic blankets are usually held together with a paper or fiber mesh and stitching
which may last up to a year.
• Most netting used with blankets is photodegradable, meaning it will break down
under sunlight (not UV stabilized). However, this process can take months or years
even under bright sun. Once vegetation is established, sunlight does not reach the
mesh. It is not uncommon to find non-degraded netting still in place several years
after installation. This can be a problem if maintenance requires the use of mowers
or ditch cleaning equipment. In addition, birds and small animals can become
trapped in the netting.
3.1.10.4 Maintenance Standards
• Good contact with the ground must be maintained, and erosion must not occur
beneath the net or blanket.
• Repair or staple any areas of the net or blanket that are damaged or not in close
contact with the ground.
• If erosion occurs due to poorly controlled drainage, fix the problem and protect the
eroded area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 159
Figure II-3-5. Nets and Blankets – Slope Installation
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 160
Figure II-3-6. Nets and Blankets – Channel Installation
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 161
3.1.11 BMP C123: Plastic Covering
3.1.11.1 Purpose
Plastic covering provides immediate, short-term erosion protection to slopes and disturbed areas.
3.1.11.2 Conditions of Use
See Figure II-3-7.
• Plastic covering may be used on disturbed areas that require cover measures for
less than 30 days, except as stated below.
• Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: The
relatively rapid breakdown of most polyethylene sheeting makes it unsuitable for
long-term (greater than six months) applications.
• Clear plastic sheeting can be used over newly-seeded areas to create a greenhouse
effect and encourage grass growth if the hydroseed was installed too late in the
season to establish 75 percent grass cover, or if the wet season started earlier than
normal. Clear plastic should not be used for this purpose during the summer months
because the resulting high temperatures can kill the grass.
• Due to rapid runoff caused by plastic sheeting, this method shall not be used upslope
of areas that might be adversely impacted by concentrated runoff. Such areas
include steep and/or unstable slopes.
• While plastic is inexpensive to purchase, the added cost of installation, maintenance,
removal, and disposal can make this an expensive material.
• Whenever plastic is used to protect slopes, water collection measures must be
installed at the base of the slope. These measures include plastic-covered berms,
channels, and pipes used to convey clean rainwater away from bare soil and
disturbed areas. At no time is clean runoff from a plastic covered slope to be mixed
with dirty runoff from a project.
• Other uses for plastic include:
o Temporary ditch liner;
o Pond liner in temporary sediment pond;
o Liner for bermed temporary fuel storage area if plastic is not reactive to the
type of fuel being stored;
o Emergency slope protection during heavy rains; and
o Temporary drainpipe (“elephant trunk”) used to direct water.
3.1.11.3 Design and Installation Specifications
Plastic slope cover must be installed as follows:
• Run plastic up and down slope, not across slope.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 162
• Plastic may be installed perpendicular to a slope if the slope length is less than
10 feet.
• Minimum of 8-inch overlap at seams.
• On long or wide slopes, or slopes subject to wind, all seams should be taped.
• Place plastic into a small (12-inch wide by 6-inch deep) slot trench at the top of the
slope and backfill with soil to keep water from flowing underneath.
• Place sand filled burlap or geotextile bags every 3 to 6 feet along seams and pound
a wooden stake through each to hold them in place. Alternative options for holding
plastic in place exist and may be considered with City of Auburn approval.
• Inspect plastic for rips, tears, and open seams regularly and repair immediately. This
prevents high velocity runoff from contacting bare soil, which causes extreme
erosion;
• Sandbags may be lowered into place tied to ropes. However, all sandbags must be
staked in place.
NOTE: Methods other than staking down plastic with sandbags may be used with City of
Auburn approval.
• Plastic sheeting shall have a minimum thickness of 0.06 millimeters.
• If erosion at the toe of a slope is likely, a gravel berm, riprap, or other suitable
protection shall be installed at the toe of the slope in order to reduce the velocity of
runoff.
3.1.11.4 Maintenance Standards
• Torn sheets must be replaced and open seams repaired.
• If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely
removed and replaced.
• When the plastic is no longer needed, it shall be completely removed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 163
Figure II-3-7. Soil Erosion Protection – Plastic Covering
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 164
3.1.12 BMP C124: Sodding
3.1.12.1 Purpose
The purpose of sodding is to establish permanent turf for immediate erosion protection and to
stabilize drainage ways where concentrated overland flow will occur.
3.1.12.2 Conditions of Use
Sodding may be used in the following areas:
• Disturbed areas that require short-term or long-term cover.
• Disturbed areas that require immediate vegetative cover.
• All waterways that require vegetative lining. Waterways may also be seeded rather
than sodded, and protected with a net or blanket.
3.1.12.3 Design and Installation Specifications
Sod shall be free of weeds, of uniform thickness (approximately 1-inch thick), and shall have a dense
root mat for mechanical strength.
The following steps are recommended for sod installation:
• Shape and smooth the surface to final grade in accordance with the approved
grading plan. Overexcavate the swale 4 to 6 inches below design elevation to allow
room for placing soil amendment and sod.
• Amend 4 inches (minimum) of compost into the top 8 inches of the soil if the organic
content of the soil is less than ten percent or the permeability is less than 0.6 inches
per hour. Compost used should meet Ecology specifications for Grade A quality
compost. See http://www.ecy.wa.gov/programs/swfa/compost/
• Fertilize according to the supplier's recommendations.
• Work lime and fertilizer 1 to 2 inches into the soil, and smooth the surface.
• Lay strips of sod beginning at the lowest area to be sodded and perpendicular to the
direction of water flow. Wedge strips securely into place. Square the ends of each
strip to provide for a close, tight fit. Stagger joints at least 12 inches. Staple on slopes
steeper than 3H:1V. Staple the upstream edge of each sod strip.
• Roll the sodded area and irrigate.
• When sodding is carried out in alternating strips or other patterns, seed the areas
between the sod immediately after sodding.
3.1.12.4 Maintenance Standards
If the grass is unhealthy, the cause shall be determined and appropriate action taken to reestablish a
healthy groundcover. If it is impossible to establish a healthy groundcover due to frequent saturation,
instability, or some other cause, the sod shall be removed, the area seeded with an appropriate mix,
and protected with a net or blanket.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 165
3.1.13 BMP C125: Compost
3.1.13.1 Purpose
The purpose of compost is to help establish vegetation and filter stormwater thus removing fine
sediment and other contaminants. Compost can be used alone as a compost blanket, as a berm, or
inside a sock.
3.1.13.2 Conditions of Use
• Do not use if stormwater will discharge to a nutrient sensitive waterbody.
• Do not use as a storm drain inlet protection measure.
3.1.13.3 Design and Installation Specifications
Compost Blankets
Compost blankets are simply compost blanketed over an area.
• Place compost 3” thick.
• Compost can be blown onto slopes up to 2:1 or spread by hand on shallower slopes.
• Compost must be ¾ to 1 inch-minus screened compost meeting Ecology’s
requirements for Grade A quality compost. See
http://www.ecy.wa.gov/programs/swfa/compost for more information on compost
quality.
• Compost can be mixed with a seed mix to ensure rapid vegetation.
• Compost does not need to be removed after construction phase unless required by
the project engineer or geotechnical professional.
Compost Berms
Compost berms are a perimeter sediment control that can be used instead of silt fence.
• Do not use compost berms on steep slopes.
• Berm width shall be a minimum of 2 feet.
• Berm height shall be a minimum of 12 inches.
• Berm width shall be twice the berm height.
Compost can be blown in place or placed by front-end loader. Compost must be ¾ to 1 inch-minus
screened compost meeting Ecology’s requirements for Grade A quality compost. See
http://www.ecy.wa.gov/programs/swfa/compost for more information on compost quality.
Compost should be spread over proposed landscaped section when construction is complete to aid
in revegetation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 166
Compost Socks
Compost socks are similar to straw wattles.
• Sock material that is biodegradable will last up to 6 months and can be used for soil
amendment after 6 months.
• Sock material that is non-biodegradable must be removed after construction is
complete.
• Place socks perpendicular to flow.
• Walk socks in place to ensure good soil contact.
• Install wooden stakes every 12” on steep slopes or every 24” on shallow slopes
3.1.13.4 Maintenance Standards
Compost Blankets
• Inspect compost regularly.
• Ensure a 3” thick blanket.
Compost Berms
• Inspect compost berm regularly.
• Ensure vehicular traffic does not cross berm and track compost off-site. If this
occurs, sweep compost immediately.
Compost Socks
• Do not allow erosion or concentrated runoff under or around the barrier.
• Inspect the socks after each rainfall and repair any socks that tear or are not abutting
the ground.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 167
3.1.14 BMP C126: Topsoiling
3.1.14.1 Purpose
To provide a suitable growth medium for final site stabilization with vegetation. While not a permanent
cover practice in itself, topsoiling is an integral component of providing permanent cover in those
areas where there is an unsuitable soil surface for plant growth. Native soils and disturbed soils that
have been organically amended not only retain much more stormwater, but they also serve as
effective biofilters for urban pollutants and, by supporting more vigorous plant growth, reduce the
amount of water, fertilizer, and pesticides needed to support installed landscapes. Topsoil does not
include any subsoils, only the material from the top several inches, including organic debris.
3.1.14.2 Conditions of Use
Native soils should be left undisturbed to the maximum extent practicable. Native soils disturbed
during clearing and grading should be restored, to the maximum extent practicable, to a condition
where moisture-holding capacity is equal to or better than the original site conditions. This criterion
can be met by using on-site native topsoil, incorporating amendments into on-site soil, or importing
blended topsoil.
• Topsoiling is a required procedure when establishing vegetation on shallow soils,
and soils of critically low pH (high acid) levels.
• Stripping of the existing, properly functioning soil system and vegetation for the
purpose of topsoiling during construction is not acceptable. If an existing soil system
is functioning properly, it shall be preserved in its undisturbed and uncompacted
condition.
• Depending on where the topsoil comes from, or what vegetation was on site before
disturbance, invasive plant seeds may be included and could cause problems for
establishing native plants, landscaped areas, or grasses.
• Topsoil from the site will contain mycorrhizal bacteria that are necessary for healthy
root growth and nutrient transfer. These native mycorrhiza are acclimated to the site
and will provide optimum conditions for establishing grasses. Commercially available
mycorrhiza products should be used when topsoil is brought in from off-site.
3.1.14.3 Design and Installation Specifications
If topsoiling is to be done, the following items should be considered:
• Maximize the depth of the topsoil wherever possible to provide the maximum
possible infiltration capacity and beneficial growth medium. Topsoil depth shall be at
least 8 inches with a minimum organic content of 10 percent dry weight and pH
between 6.0 and 8.0 or matching the pH of the undisturbed soil. This can be
accomplished either by returning native topsoil to the site and/or incorporating
organic amendments. Organic amendments should be incorporated to a minimum 8-
inch depth except where tree roots or other natural features limit the depth of
incorporation. Subsoils below the 12-inch depth should be scarified at least 4 inches
to avoid stratified layers, where feasible. The decision to either layer topsoil over a
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 168
subgrade or incorporate topsoil into the underlying layer may vary depending on the
planting specified.
• If blended topsoil is imported, fines should be limited to 25 percent passing through a
200 sieve.
• The final composition and construction of the soil system will result in a natural
selection or favoring of certain plant species over time. For example, recent practices
have shown that incorporation of topsoil may favor grasses, while layering with mildly
acidic, high-carbon amendments may favor more woody vegetation.
• Locate the topsoil stockpile so it meets specifications and does not interfere with
work on the site. It may be possible to locate more than one pile in proximity to areas
where topsoil will be used.
• Allow sufficient time in scheduling for topsoil to be spread prior to seeding, sodding,
or planting.
• Care must be taken not to apply topsoil over subsoil if the two soils have contrasting
textures. Sandy topsoil over clayey subsoil is a particularly poor combination, as
water creeps along the junction between the soil layers and causes the topsoil to
slough.
• If topsoil and subsoil are not properly bonded, water will not infiltrate the soil profile
evenly and it will be difficult to establish vegetation. The best method to prevent a
lack of bonding is to work the topsoil into the layer below for a depth of at least 6
inches.
• Ripping or re-structuring the subgrade may also provide additional benefits regarding
the overall infiltration and interflow dynamics of the soil system.
• Field exploration of the site shall be made to determine if there is surface soil of
sufficient quantity and quality to justify stripping. Topsoil shall be friable and loamy
(loam, sandy loam, silt loam, sandy clay loam, clay loam). Areas of natural
groundwater recharge should be avoided.
• Confine stripping to the immediate construction area. A 4- to 6- inch stripping depth
is common, but depth may vary depending on the particular soil. Place all surface
runoff control structures in place prior to stripping.
Stockpile topsoil in the following manner:
• Side slopes of the stockpile shall not exceed 2:1.
• Surround all topsoil stockpiles between October 1 and April 30 with an interceptor
dike with gravel outlet and silt fence. Between May 1 and September 30, install an
interceptor dike with gravel outlet and silt fence if the stockpile will remain in place for
a longer period of time than active construction grading.
• Complete erosion control seeding or covering with clear plastic or other mulching
materials of stockpiles within 2 days (October 1 through April 30) or 7 days (May 1
through September 30) of the formation of the stockpile. Do not cover native topsoil
stockpiles with plastic.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 169
• Topsoil shall not be placed while in a frozen or muddy condition, when the subgrade
is excessively wet, or when conditions exist that may otherwise be detrimental to
proper grading or proposed sodding or seeding.
• Maintain previously established grades on the areas to be topsoiled according to the
approved plan.
• When native topsoil is to be stockpiled and reused, the following should apply to
ensure that the mycorrhizal bacterial, earthworms, and other beneficial organisms
will not be destroyed:
o Topsoil is to be re-installed within 4 to 6 weeks;
o Topsoil is not to become saturated with water;
o Plastic cover is not allowed.
3.1.14.4 Maintenance Standards
Inspect stockpiles regularly, especially after large storm events. Stabilize any areas that have eroded.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 170
3.1.15 BMP C127: Polyacrylamide for Soil Erosion Protection
3.1.15.1 Purpose
Polyacrylamide (PAM) is used on construction sites to prevent soil erosion.
Applying PAM to bare soil in advance of a rain event significantly reduces erosion and controls
sediment in two ways. PAM helps maintain soil structure, which increases the ability to infiltrate.
3.1.15.2 Conditions of Use
Do not apply PAM directly to water or allow it to enter a water body. In areas that drain to a
sediment pond, PAM can be applied to bare soil under the following conditions:
• During rough grading operations.
• Staging areas.
• Balanced cut and fill earthwork.
• Haul roads prior to placement of crushed rock surfacing.
• Compacted soil roadbase.
• Stockpiles.
• After final grade and before paving or final seeding and planting.
• Pit sites.
• Sites having a winter shut down. In the case of winter shut down, or where soil will
remain unworked for several months, PAM should be used together with mulch.
3.1.15.3 Design and Installation Specifications
PAM may be applied in dissolved form with water, or it may be applied in dry, granular or powdered
form. The preferred application method is the dissolved form.
PAM is to be applied at a maximum rate of 2/3 pound PAM per 1,000 gallons water (80 mg/L) per 1
acre of bare soil. Higher concentrations of PAM do not provide any additional effectiveness.
The Preferred Method:
• Pre-measure the area where PAM is to be applied and calculate the amount of
product and water necessary to provide coverage at the specified application rate
(2/3 pound PAM per 1,000 gallons per acre).
• PAM has infinite solubility in water, but dissolves very slowly. Dissolve pre-measured
dry granular PAM with a known quantity of clean water in a bucket several hours or
overnight. Mechanical mixing will help dissolve the PAM. Always add PAM to water -
not water to PAM.
• Pre-fill the water truck about 1/8 full with water. The water does not have to be
potable, but it must have relatively low turbidity – in the range of 20 NTU or less.
• Add PAM and water mixture to the truck.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 171
• Completely fill the water truck to specified volume.
• Spray PAM and water mixture onto dry soil until the soil surface is uniformly and
completely wetted.
An Alternate Method:
PAM may also be applied as a powder at the rate of 5 pounds per acre. This must be applied on a
day that is dry. For areas less than 5 to 10 acres, a hand-held “organ grinder” fertilizer spreader set to
the smallest setting will work. Tractor-mounted spreaders will work for larger areas.
Benefits and Limitations:
The following benefits and limitations should be considered:
• PAM shall be used in conjunction with other BMPs and not in place of other BMPs.
• The steeper the slope, the less benefit PAM will provide and the more critical it is to
use proper groundcover for erosion control.
• Do not use PAM on a slope that flows directly into a stream or wetland or any other
waterbody.
• PAM has little to no effect on sandy soils with little clay content.
• Do not add PAM to water discharging from site.
• When the total drainage area is greater than or equal to 5 acres, PAM treated areas
shall drain to a sediment pond.
• Areas less than 5 acres shall drain to sediment control BMPs, such as a minimum of
3 check dams per acre. The total number of check dams used shall be maximized to
achieve the greatest amount of settlement of sediment prior to discharging from the
site. Each check dam shall be spaced evenly in the drainage channel through which
stormwater flows are discharged off-site.
• On all sites, use silt fences to limit the discharges of sediment from the site.
• Cover and protect all areas not being actively worked from rainfall. PAM shall not be
the only cover BMP used.
• PAM can be applied to wet soil, but dry soil is preferred due to less sediment loss.
• PAM will work when applied to saturated soil but is not as effective as applications to
dry or damp soil.
• Keep the granular PAM supply out of the sun. Granular PAM loses its effectiveness
in three months after exposure to sunlight and air.
• Proper application and re-application plans are necessary to ensure total
effectiveness of PAM usage.
• PAM, combined with water, is very slippery and can be a safety hazard. Care must
be taken to prevent spills of PAM powder onto paved surfaces. During an application
of PAM, prevent over-spray from reaching pavement, as pavement will become
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 172
slippery. If PAM powder gets on skin or clothing, wipe it off with a rough towel rather
than washing with water, which makes cleanup messier and take longer.
• Some PAMs are more toxic and carcinogenic than others. Only the most
environmentally safe PAM products should be used.
• The specific PAM copolymer formulation must be anionic. Cationic PAM shall not
be used in any application because of known aquatic toxicity problems. Only
the highest drinking water grade PAM, certified for compliance with ANSI/NSF
Standard 60 for drinking water treatment, will be used for soil applications. PAM use
shall be reviewed and approved by the City. The Washington State Department of
Transportation (WSDOT) has listed approved PAM products on its web page.
• PAM designated for these uses should be "water soluble", "linear", or "non-
crosslinked". Cross-linked or water absorbent PAM, polymerized in highly acidic
(pH<2) conditions, are used to maintain soil moisture content.
• The PAM anionic charge density may vary from 2 to 30 percent; a value of 18
percent is typical. Studies conducted by the United States Department of Agriculture
(USDA)/ARS demonstrated that soil stabilization was optimized by using very high
molecular weight (12-15 mg/mole), highly anionic (>20% hydrolysis) PAM.
• PAM tackifiers are available and being used in place of guar and alpha plantago.
Typically, PAM tackifiers should be used at a rate of no more than 0.5 to 1 pounds
per 1,000 gallons of water in a hydromulch machine. Some tackifier product
instructions say to use at a rate of 3 to 5 pounds per acre, which can be too much. In
addition, pump problems can occur at higher rates due to increased viscosity.
3.1.15.4 Maintenance Standards
• PAM may be reapplied on actively worked areas after a 48-hour period.
• Reapplication is not required unless PAM treated soil is disturbed or turbidity levels
show the need for an additional application. If PAM treated soil is left undisturbed, a
reapplication may be necessary after two months. When PAM is applied first to bare
soil and then covered with straw, a reapplication may not be necessary for several
months.
• Loss of sediment and PAM may be a basis for penalties per RCW 90.48.080.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 173
3.1.16 BMP C130: Surface Roughening
3.1.16.1 Purpose
Surface roughening aids in the establishment of vegetative cover, reduces runoff velocity, increases
infiltration, and provides for sediment trapping through the provision of a rough soil surface.
Horizontal depressions are created by operating a tiller or other suitable equipment on the contour or
by leaving slopes in a roughened condition by not fine grading them.
3.1.16.2 Conditions for Use
All slopes steeper than 3H:1V and greater than 5 vertical feet require surface roughening.
• Areas with grades steeper than 3H:1V should be roughened to a depth of 2 to 4
inches prior to seeding.
• Areas that will not be stabilized immediately may be roughened to reduce runoff
velocity until seeding takes place.
• Slopes with a stable rock face do not require roughening.
• Slopes where mowing is planned should not be excessively roughened.
3.1.16.3 Design and Installation Specifications
There are different methods for achieving a roughened soil surface on a slope, and the selection of
an appropriate method depends upon the type of slope. Roughening methods include stair-step
grading, grooving, contour furrows, and tracking. See Figure II-3-8 for tracking and contour furrows.
Factors to be considered in choosing a method are slope steepness, mowing requirements, and
whether the slope is formed by cutting or filling.
• Graded areas with slopes greater than 3:1 but less than 2:1 should be roughened
before seeding. This can be accomplished in a variety of ways, including "track
walking," or driving a crawler tractor up and down the slope, leaving a pattern of cleat
imprints parallel to slope contours.
• Tracking is done by operating equipment up and down the slope to leave horizontal
depressions in the soil.
3.1.16.4 Maintenance Standards
• Areas that are graded in this manner should be seeded as quickly as possible.
• Regular inspections should be made of the area. If rills appear, they should be re-
graded and re-seeded immediately.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 174
Figure II-3-8. Surface Roughening by Tracking and Contour Furrows
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 175
3.1.17 BMP C131: Gradient Terraces
3.1.17.1 Purpose
Gradient terraces reduce erosion damage by intercepting surface runoff and conducting it to a stable
outlet at a non-erosive velocity.
3.1.17.2 Conditions of Use
Gradient terraces normally are limited to denuded land having a water erosion problem. They should
not be constructed on deep sands or on soils that are too stony, steep, or shallow to permit practical
and economical installation and maintenance. Gradient terraces may be used only where suitable
outlets are or will be made available. See Figure II-3-9 for gradient terraces.
3.1.17.3 Design and Installation Specifications
The maximum spacing of gradient terraces should be determined by the following method:
VI = (0.8)s + y
Where:
VI = vertical interval in feet
s = land rise per 100 feet, expressed in feet
y = a soil and cover variable with values from 1.0 to 4.0
Values of “y” are influenced by soil erodibility and cover practices. The lower values are applicable to
erosive soils where little to no residue is left on the surface. The higher value is applicable only to
erosion-resistant soils where a large amount of residue (1½ tons of straw/acre equivalent) is on the
surface.
• The minimum constructed cross-section should meet the design dimensions.
• The top of the constructed ridge should not be lower at any point than the design
elevation plus the specified overfill for settlement. The opening at the outlet end of
the terrace should have a cross section equal to that specified for the terrace
channel.
• Channel grades may be either uniform or variable with a maximum grade of 0.6 feet
per 100 feet length. For short distances, terrace grades may be increased to improve
alignment. The channel velocity should not exceed that which is non-erosive for the
soil type with the planned treatment.
• All gradient terraces should have adequate outlets. Such an outlet may be a grassed
waterway, vegetated area, or tile outlet. In all cases, the outlet must convey runoff
from the terrace or terrace system to a point where the outflow will not cause
damage. Vegetative cover should be used in the outlet channel.
• The design elevation of the water surface of the terrace should not be lower than the
design elevation of the water surface in the outlet at their junction, when both are
operating at design flow.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 176
• Vertical spacing determined by the above methods may be increased as much as
0.5 feet or 10 percent, whichever is greater, to provide better alignment or location,
avoid obstacles, adjust for equipment size, or reach a satisfactory outlet.
• The drainage area above the top should not exceed the area that would be drained
by a terrace with normal spacing.
• The terrace should have enough capacity to handle the peak runoff expected from a
2-year, 24-hour design storm without overtopping.
• The terrace cross-section should be proportioned to fit the land slope. The ridge
height should include a reasonable settlement factor. The ridge should have a
minimum top width of 3 feet at the design height. The minimum cross-sectional area
of the terrace channel should be 8 square feet for land slopes of 5 percent or less, 7
square feet for slopes from 5 to 8 percent, and 6 square feet for slopes steeper than
8 percent. The terrace can be constructed wide enough to be maintained using a
small cat.
3.1.17.4 Maintenance Standards
Maintenance should be performed as needed. Terraces should be inspected regularly, at least once
a year, and after large storm events.
Figure II-3-9. Gradient Terraces
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 177
3.1.18 BMP C140: Dust Control
3.1.18.1 Purpose
Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways, drainage
ways, and surface waters.
3.1.18.2 Conditions of Use
Use dust control practices in areas (including roadways) subject to surface and air movement of dust
where on-site and off-site impacts to roadways, drainage ways, or surface waters are likely.
3.1.18.3 Design and Installation Specifications
• Vegetate or mulch areas that will not receive vehicle traffic. In areas where planting,
mulching, or paving is impractical, apply gravel or landscaping rock.
• Limit dust generation by clearing only to those areas where immediate activity will
take place, leaving the remaining area(s) in the original condition, if stable. Maintain
the original ground cover as long as practical.
• Construct natural or artificial windbreaks or windscreens. These may be designed as
enclosures for small dust sources.
• Sprinkle the site with water until surface is wet. Repeat as needed. To prevent
carryout of mud onto street, refer to Stabilized Construction Entrance (BMP C105).
• Irrigation water can be used for dust control. Install irrigation systems as a first step
on sites where dust control is a concern.
• Spray exposed soil areas with a dust palliative, following the manufacturer’s
instructions and cautions regarding handling and application. Used oil is prohibited
from use as a dust suppressant. The City may approve other dust palliatives such as
calcium chloride or PAM.
• PAM (BMP C127) added to water at a rate of 2/3 pounds per 1,000 gallons of water
per acre and applied from a water truck is more effective than water alone. This is
due to the increased infiltration of water into the soil and reduced evaporation. In
addition, small soil particles are bonded together and are not as easily transported by
wind. Adding PAM may actually reduce the quantity of water needed for dust control.
There are concerns with the proper use of PAM, refer to BMP C127 for more
information on PAM application. PAM use requires City approval.
• Lower speed limits. High vehicle speed increases the amount of dust stirred up from
unpaved roads and lots.
• Upgrade the road surface strength by improving particle size, shape, and mineral
types that make up the surface and base materials.
• Add surface gravel to reduce the source of dust emission. Limit the amount of fine
particles to 10 to 20 percent.
• Use geotextile fabrics to increase the strength of new roads or roads undergoing
reconstruction.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 178
• Encourage the use of alternate, paved routes, if available.
• Restrict use by tracked vehicles and heavy trucks to prevent damage to road
surfaces and bases.
• Apply chemical dust suppressants using the admix method, blending the product
with the top few inches of surface material. Suppressants may also be applied as
surface treatments.
• Pave unpaved permanent roads and other trafficked areas.
• Use vacuum street sweepers.
• Remove mud and other dirt promptly so it does not dry and then turn into dust.
• Limit dust-causing work on windy days.
• Contact the Puget Sound Clean Air Agency for guidance and training on other dust
control measures. Compliance with the Puget Sound Clean Air Agency’s
recommendations/requirements constitutes compliance with this BMP.
3.1.18.4 Maintenance Standards
Evaluate the potential for dust generation frequently during dry periods. Complete the actions outlines
above as needed to limit the dust.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 179
3.1.19 BMP C150: Materials On Hand
3.1.19.1 Purpose
Quantities of erosion prevention and sediment control materials should be kept on the project site at
all times to be used for emergency situations such as unexpected heavy summer rains. Having these
materials on-site reduces the time needed to implement BMPs when inspections indicate that
existing BMPs are not meeting the Construction SWPPP requirements. In addition, it may be more
economical to buy some materials in bulk and store them at the office or yard for future use.
3.1.19.2 Conditions of Use
Construction projects of any size or type can benefit from having materials on hand. A small
commercial development project could have a roll of plastic and some gravel available for immediate
protection of bare soil and temporary berm construction. A large earthwork project, such as highway
construction, might have several tons of straw, several rolls of plastic, flexible pipe, sandbags,
geotextile fabric, and steel “T” posts.
• Materials are stockpiled and readily available before any site clearing, grubbing, or
earthwork begins. A large contractor or developer could keep a stockpile of materials
that are available to be used on several projects.
• If storage space at the project site is at a premium, the contractor could maintain the
materials at their office or yard. The office or yard must be less than an hour from the
project site.
3.1.19.3 Design and Installation Specifications
Depending on project type, size, complexity, and length, materials and quantities will vary. Table II-
3-8 provides a good minimum that will cover numerous situations.
Table II-3-8. Materials on Hand
Material Measure Quantity
Clear Plastic, 6 mil 100 foot roll 1-2
Drainpipe, 6 or 8 inch diameter 25 foot section 4-6
Sandbags, filled each 25-50
Straw Bales for mulching, approx. 50# each 10-20
Quarry Spalls ton 2-4
Washed Gravel cubic yard 2-4
Geotextile Fabric 100 foot roll 1-2
Catch Basin Inserts each 2-4
Steel “T” Posts each 12-24
3.1.19.4 Maintenance Standards
• All materials with the exception of the quarry spalls, steel “T” posts, and gravel
should be kept covered and out of both sun and rain.
• Re-stock materials used as needed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 180
3.1.20 BMP C151: Concrete Handling
3.1.20.1 Purpose
Concrete work can generate process water and slurry that contain fine particles and high pH, both of
which can violate water quality standards in the receiving water. This BMP is intended to minimize
and eliminate concrete process water and slurry from entering waters of the state.
3.1.20.2 Conditions of Use
Utilize these management practices any time concrete is used.
Concrete construction projects include, but are not limited to, the following:
• Curbs
• Sidewalks
• Roads
• Bridges
• Foundations
• Floors
• Runways
3.1.20.3 Design and Installation Specifications
• Concrete truck chutes, pumps, and internals shall be washed out only into formed
areas awaiting installation of concrete or asphalt.
• When no formed areas are available, contain washwater and leftover product in a
lined container. Dispose of washwater in a manner that does not violate groundwater
or surface water quality standards.
• Unused concrete remaining in the truck and pump shall be returned to the originating
batch plant for recycling.
• Hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels
shall be washed off only into formed areas awaiting installation of concrete or
asphalt.
• Equipment that cannot be easily moved, such as concrete pavers, shall only be
washed in areas that do not directly drain to natural or constructed stormwater
conveyances.
• Washdown from areas such as concrete aggregate driveways shall not drain directly
to natural or constructed stormwater conveyances.
3.1.20.4 Maintenance Standards
Containers shall be checked for holes in the liner daily during concrete pours and repaired the same
day.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 181
3.1.21 BMP C152: Sawcutting and Surfacing Pollution Prevention
3.1.21.1 Purpose
Sawcutting and surfacing operations generate slurry and process water that contains fine particles
and high pH (concrete cutting), both of which can violate water quality standards in the receiving
water. This BMP is intended to minimize and eliminate process water and slurry from entering waters
of the State
3.1.21.2 Conditions of Use
Anytime sawcutting or surfacing operations take place, use these management practices. Sawcutting
and surfacing operations include, but are not limited to, the following:
• Sawing
• Coring
• Grinding
• Roughening
• Hydro-demolition
• Bridge and road surfacing
3.1.21.3 Design and Installation Specifications
• Vacuum slurry and cuttings during cutting and surfacing operations.
• Do not leave slurry and cuttings on permanent concrete or asphalt pavement
overnight.
• Do not drain slurry and cuttings to any natural or constructed drainage conveyance.
• Dispose of collected slurry and cuttings in a manner that does not violate
groundwater or surface water quality standards.
• Do not drain process water that is generated during hydro-demolition, surface
roughening, or similar operations to any natural or constructed drainage conveyance
and dispose of it in a manner that does not violate groundwater or surface water
quality standards.
• Handle and dispose of cleaning waste material and demolition debris in a manner
that does not cause contamination of water. If the area is swept with a pick-up
sweeper, haul the material out of the area to an appropriate disposal site.
3.1.21.4 Maintenance Standards
Continually monitor operations to determine whether slurry, cuttings, or process water could enter
waters of the state. If inspections show that a violation of water quality standards could occur, stop
operations and immediately implement preventive measures such as berms, barriers, secondary
containment, and vacuum trucks.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 182
3.1.22 BMP C153: Material Delivery, Storage and Containment
3.1.22.1 Purpose
Prevent, reduce, or eliminate the discharge of pollutants from material delivery and storage to the
stormwater system or watercourses by minimizing the storage of hazardous materials onsite, storing
materials in a designated area, and installing secondary containment.
3.1.22.2 Conditions of Use
These procedures are suitable for use at all construction sites with delivery and storage of the
following materials:
• Petroleum products such as fuel, oil, and grease
• Soil stabilizers and binders (e.g. Polyacrylamide)
• Fertilizers, pesticides, and herbicides
• Detergents
• Asphalt and concrete compounds
• Hazardous chemicals such as acids, lime, adhesives, paints, solvents, and curing
compounds
• Any other material that may be detrimental if released to the environment
3.1.22.3 Design and Installation Specifications
The following steps should be taken to minimize risk:
• Locate temporary storage area away from vehicular traffic, near the construction
entrance(s), and away from waterways or storm drains.
• Supply Material Safety Data Sheets (MSDS) for all materials stored. Keep chemicals
in their original labeled containers.
• Surrounding materials with earth berms is an option for temporary secondary
containment.
• Minimize hazardous material storage on-site.
• Handle hazardous materials as infrequently as possible.
• During the wet weather season (October 1 through April 30), consider storing
materials in a covered area.
• Store materials in secondary containment, such as an earthen dike, a horse trough,
or a children’s wading pool for non-reactive materials such as detergents, oil, grease,
and paints. “Bus boy” trays or concrete mixing trays may be used as secondary
containment for small amounts of material.
• Do not store chemicals, drums, or bagged materials directly on the ground. Place
these items on a pallet and, when possible, in secondary containment.
• If drums cannot be stored under a roof, domed plastic covers are inexpensive and
snap to the top of drums, preventing water from collecting.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 183
3.1.22.4 Material Storage Areas and Secondary Containment Practices:
• Store liquids, petroleum products, and substances listed in 40 CFR Parts 110, 117,
or 302 in approved containers and drums and do not overfill the containers or drums.
Store containers and drums in temporary secondary containment facilities.
• Temporary secondary containment facilities shall provide for a spill containment
volume able to contain precipitation from a 25 year, 24 hour storm event plus 10% of
the total enclosed container volume of all containers, or 110% of the capacity of the
largest container within its boundary, whichever is greater.
• Secondary containment facilities shall be impervious to the materials stored therein
for a minimum contact time of 72 hours.
• Secondary containment facilities shall be maintained free of accumulated rainwater
and spills. In the event of spills or leaks, collect accumulated rainwater and spills and
place into drums. Handle these liquids as hazardous waste unless testing
determines them to be non-hazardous.
• Provide sufficient separation between stored containers to allow for spill cleanup and
emergency response access.
• During the wet weather season (October 1 through April 30), cover each secondary
containment facility during non-working days, prior to and during rain events.
• Keep material storage areas clean, organized, and equipped with an ample supply of
appropriate spill clean-up material.
• The spill kit should include, at a minimum:
o 1 water resistant nylon bag
o 3 oil absorbent socks (3-inches by 4-feet)
o 2 oil absorbent socks (3-inches by 10-feet)
o 12 oil absorbent pads (17-inches by 19-inches)
o 1 pair splash resistant goggles
o 3 pairs nitrile gloves
o 10 disposable bags with ties
o Instructions
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 184
3.1.23 BMP C154: Concrete Washout Area
3.1.23.1 Purpose
Prevent or reduce the discharge of pollutants to stormwater from concrete waste by conducting
washout offsite, or performing onsite washout in a designated area to prevent pollutants from
entering surface waters or groundwater.
3.1.23.2 Conditions of Use
Use concrete washout best management practices on construction projects where:
• Concrete is used as a construction material.
• It is not possible to dispose of all concrete wastewater and washout offsite (ready
mix plant, etc.)
• Concrete trucks, pumpers, or other concrete coated equipment are washed onsite.
NOTE: If less than 3 concrete trucks or pumpers need to be washed on-site, the washwater may be
disposed of in a formed area awaiting concrete or an upland disposal area where it cannot
contaminate surface or groundwater. The upland disposal area must be at least 50 feet from
sensitive areas such as storm drains, open ditches, or waterbodies, including wetlands. Do not allow
dirty water to enter storm drains, open ditches, or any waterbody.
3.1.23.3 Implementation
The following steps will help reduce stormwater pollution from concrete wastes:
• Perform washout of concrete trucks offsite or in designated concrete washout areas
only.
• Do not wash out concrete trucks onto the ground, or into storm drains, open ditches,
streets, or streams.
• Do not allow excess concrete to be dumped onsite, except in designated concrete
washout areas.
• Concrete washout areas may be prefabricated concrete washout containers, or self-
installed structures (above-grade or below-grade).
o Prefabricated containers are most resistant to damage and protect against
spills and leaks. Companies may offer delivery service and provide regular
maintenance and disposal of solid and liquid waste.
o If self-installed concrete washout areas are used, below-grade structures are
preferred over above-grade structures because they are less prone to spills
and leaks.
o Self-installed above-grade structures should only be used if excavation is not
practical.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 185
3.1.23.4 Education
• Discuss the concrete management techniques described in this BMP with the ready-
mix concrete supplier before any deliveries are made.
• Educate employees and subcontractors on the concrete waste management
techniques described in this BMP.
• Arrange for contractor’s superintendent or Certified Erosion and Sediment Control
Lead (CESCL) to oversee and enforce concrete waste management procedures.
• Install a sign adjacent to each temporary concrete washout facility to inform concrete
equipment operators to utilize the proper facilities.
3.1.23.5 Contracts
Incorporate requirements for concrete waste management into concrete supplier and subcontractor
agreements.
3.1.23.6 Location and Placement Considerations:
• Locate washout area at least 50 feet from sensitive areas such as storm drains, open
ditches, or water bodies, including wetlands.
• Allow convenient access for concrete trucks, preferably near the area where the
concrete is being poured.
• If trucks need to leave a paved area to access washout, prevent track-out with a pad
of rock or quarry spalls (BMP C105). These areas should be far enough away from
other construction traffic to reduce the likelihood of accidental damage and spills.
• The number of facilities you install should depend on the expected demand for
storage capacity.
• On large sites with extensive concrete work, washouts should be placed in multiple
locations for ease of use by concrete truck drivers.
3.1.23.7 Onsite Temporary Concrete Washout Facility, Transit Truck Washout
Procedures:
• Locate temporary concrete washout facilities a minimum of 50 ft from sensitive areas
including storm drain inlets, open drainage facilities, and watercourses.
• Construct and maintain concrete washout facilities in order to contain all liquid and
concrete waste generated by washout operations.
o Approximately 7 gallons of wash water are used to wash one truck chute.
o Approximately 50 gallons are used to wash out the hopper of a concrete
pump truck.
• Washout of concrete trucks shall be performed in designated areas only.
• Concrete washout from concrete pumper bins can be washed into concrete pumper
trucks and discharged into designated washout area or properly disposed of offsite.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 186
• Once concrete wastes are washed into the designated area and allowed to harden,
the concrete should be broken up, removed, and disposed of per applicable solid
waste regulations. Dispose of hardened concrete on a regular basis.
Temporary Above-Grade Concrete Washout Facility
• Temporary concrete washout facility (type above grade) should be constructed as
shown on the details at the end of this BMP, with a recommended minimum length
and minimum width of 10 ft, but with sufficient quantity and volume to contain all
liquid and concrete waste generated by washout operations.
• Plastic lining material should be a minimum of 10 mil polyethylene sheeting and
should be free of holes, tears, or other defects that compromise the impermeability of
the material.
Temporary Below-Grade Concrete Washout Facility
• Temporary concrete washout facilities (type below grade) should be constructed as
shown on the details at the end of this BMP, with a recommended minimum length
and minimum width of 10 ft. The quantity and volume should be sufficient to contain
all liquid and concrete waste generated by washout operations.
• Lath and flagging should be commercial type.
• Plastic lining material shall be a minimum of 10 mil polyethylene sheeting and should
be free of holes, tears, or other defects that compromise the impermeability of the
material.
• Liner seams shall be installed in accordance with manufacturers’ recommendations.
• Soil base shall be prepared free of rocks or other debris that may cause tears or
holes in the plastic lining material.
3.1.23.8 Inspection and Maintenance
• Inspect and verify that concrete washout BMPs are in place prior to the
commencement of concrete work.
• During periods of concrete work, inspect daily to verify continued performance.
o Check overall condition and performance.
o Check remaining capacity (% full).
o If using self-installed washout facilities, verify plastic liners are intact and
sidewalls are not damaged.
o If using prefabricated containers, check for leaks.
• Maintain washout facilities to provide adequate holding capacity with a minimum
freeboard of 12 inches.
• Washout facilities must be cleaned, or new facilities must be constructed and ready
for use once the washout is 75% full.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 187
• If the washout is nearing capacity, vacuum and dispose of the waste material in an
approved manner.
o Do not discharge liquid or slurry to waterways, storm drains or directly onto
ground.
o Do not use sanitary sewer without local approval.
o Place a secure, non-collapsing, non-water collecting cover over the concrete
washout facility prior to predicted wet weather to prevent accumulation and
overflow of precipitation.
o Remove and dispose of hardened concrete and return the structure to a
functional condition. Concrete may be reused onsite or hauled away for
disposal or recycling.
• When you remove materials from the self-installed concrete washout, build a new
structure; or, if the previous structure is still intact, inspect for signs of weakening or
damage, and make any necessary repairs. Re-line the structure with new plastic
after each cleaning.
3.1.23.9 Removal of Temporary Concrete Washout Facilities
• When temporary concrete washout facilities are no longer required for the work,
remove and properly dispose of the hardened concrete, slurries and liquids.
• Remove materials used to construct temporary concrete washout facilities from the
site of the work and dispose of or recycle it.
• Holes, depressions or other ground disturbance caused by the removal of the
temporary concrete washout facilities shall be backfilled, repaired, and stabilized to
prevent erosion.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 188
Figure II-3-10. Temporary Concrete Washout Facility
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 189
Figure II-3-11. Prefabricated Concrete Washout Container with Ramp
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 190
3.1.24 BMP C160: Certified Erosion and Sediment Control Lead
3.1.24.1 Purpose
The project proponent designates at least one person as the responsible representative in charge of
erosion and sediment control (ESC) and water quality protection. The designated person shall be the
Certified Erosion and Sediment Control Lead (CESCL), who is responsible for ensuring compliance
with all local, state, and federal erosion and sediment control and water quality requirements.
3.1.24.2 Conditions of Use
A CESCL should be made available on project types that include, but are not limited to, the following:
• Construction activity that disturbs one acre of land or more.
• Construction activity that disturbs less than one acre of land, but is part of a larger
common plan of development or sale that will ultimately disturb one acre of land or
more.
• Heavy construction of roads, bridges, highways, airports, buildings.
• Projects near wetlands and sensitive or critical areas.
• Projects in or over water.
3.1.24.3 Specifications
The CESCL shall:
• Have a current certificate proving attendance in an erosion and sediment control
training course that meets the minimum ESC training and certification requirements
established by Ecology. Ecology will maintain a list of ESC training and certification
providers at: www.ecy.wa.gov/programs/wq/stormwater.
OR
• Be a Certified Professional in Erosion and Sediment Control (CPESC). For additional
information go to: www.cpesc.net
The CESCL shall have authority to act on behalf of the contractor or developer and shall be available,
on call, 24 hours per day throughout the period of construction.
The Construction SWPPP shall include the name, telephone number, fax number, and address of
the designated CESCL.
A CESCL may provide inspection and compliance services for multiple construction projects in the
same geographic region.
Duties and responsibilities of the CESCL shall include, but are not limited to, the following:
• Maintaining a permit file on site at all times which includes the SWPPP and any
associated permits and plans.
• Directing BMP installation, inspection, maintenance, modification, and removal.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 191
• Updating all project drawings and the Construction SWPPP with changes made.
• Keeping daily logs and inspection reports. Inspection reports should include:
o Inspection date/time.
o Weather information, general conditions during inspection, and approximate
amount of precipitation since the last inspection.
o A summary or list of all BMPs implemented, including observations of all
erosion/sediment control structures or practices. The following shall be noted:
Locations of BMPs inspected,
Locations of BMPs that need maintenance,
Locations of BMPs that failed to operate as designed or intended, and
Locations where additional or different BMPs are required.
o Visual monitoring results, including a description of discharged stormwater.
The presence of suspended sediment, turbid water, discoloration, and oil
sheen shall be noted, as applicable.
o Any water quality monitoring performed during inspection.
o General comments and notes, including a brief description of any BMP
repairs, maintenance, or installations made as a result of the inspection.
• Facilitate, participate in, and take corrective actions resulting from inspections
performed by outside agencies or the owner.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 192
3.1.25 BMP C161: Payment of Erosion Control Work
3.1.25.1 Purpose
As with any construction operation, the contractor should be paid for erosion control work. Address
payment for erosion control during project development and design. Identify the method of payment
in the SWPPP.
3.1.25.2 Conditions of Use
Erosion control work should never be “incidental” to the contract as it is extremely difficult for the
contractor to bid the work. Work that is incidental to the contract is work where no separate
measurement or payment is made. The cost for incidental work is included in payments made for
applicable bid items in the Schedule of Unit Prices. For example, any erosion control work associated
with an item called “Clearing and Grubbing” is bid and paid for as part of that item, not separately.
Two effective means for payment of erosion control work are described below. These include:
• TESC-Force Account
• Unit Prices
TESC Force Account
One good method for ensuring that contingency money is available to address unforeseen erosion
and sediment control problems is to set up an item called “TESC-Force Account”. For example, an
amount such as $15,000 is written in both the Unit Price and Amount columns for the item. This
requires all bidders to bid $15,000 for the item.
The Force Account is used only at the discretion of the contracting agency or developer. If there are
no unforeseen erosion problems, the money is not used. If there are unforeseen erosion problems,
the contracting agency would direct the work to be done and pay an agreed upon amount for the
work (such as predetermined rates under a Time and Materials setting).
Contract language for this item could look like this:
Measurement and Payment for “TESC-Force Account” will be on a Force Account basis in
accordance with_________(include appropriate section of the Contract Specifications). The amount
entered in the Schedule of Unit Prices is an estimate.
Unit Prices
When the material or work can be quantified, it can be paid by Unit Prices. For example, the project
designer knows that 2 acres will need to be hydroseeded and sets up an Item of Work for
Hydroseed, with a Bid Quantity of 2, and a Unit for Acre. The bidder writes in the unit Prices and
Amount.
Unit Price items can be used in conjunction with TESC-Force Account and TESC-Lump Sum.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 193
3.1.26 BMP C162: Scheduling
3.1.26.1 Purpose
Sequencing a construction project reduces the amount and duration of soil exposed to erosion by
wind, rain, runoff, and vehicle tracking.
3.1.26.2 Conditions of Use
The construction sequence schedule is an orderly listing of all major land-disturbing activities together
with the necessary erosion and sedimentation control measures planned for the project. This type of
schedule guides the contractor on work to be done before other work is started so serious erosion
and sedimentation problems can be avoided.
Following a specified work schedule that coordinates the timing of land-disturbing activities and the
installation of control measures is perhaps the most cost-effective way of controlling erosion during
construction. The removal of surface ground cover leaves a site vulnerable to accelerated erosion.
Construction procedures that limit land clearing, provide timely installation of erosion and
sedimentation controls, and restore protective cover quickly can significantly reduce the erosion
potential of a site.
3.1.26.3 Design Considerations
• Avoid rainy periods.
• Schedule projects to disturb only small portions of the site at any one time. Complete
grading as soon as possible. Immediately stabilize the disturbed portion before
grading the next portion. Practice staged seeding in order to revegetate cut and fill
slopes as the work progresses.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 194
3.1.27 BMP C180: Small Project Construction Stormwater Pollution
Prevention
3.1.27.1 Purpose
To prevent the discharge of sediment and other pollutants to the maximum extent practicable from
small construction projects.
3.1.27.2 Conditions of Use
Can be used on small construction projects that:
• Add or replace between 2,000 and 5,000 square feet of impervious surfaces, or
• Clear/disturb between 7,000 square feet and 1 acre of land, or
• Grade/fill less than 500 cubic yards of material.
3.1.27.3 Design and Installation Specifications
• Plan and implement proper clearing and grading of the site. It is most important to
clear only the areas needed, thus keeping exposed areas to a minimum. Phase
clearing so that only those areas actively being worked are uncovered.
NOTE: Clearing limits should be flagged in the lot or area prior to initiating clearing.
• Manage soil in a manner that does not permanently compact or deteriorate the final
soil and landscape system. If disturbance and/or compaction occur, the impact must
be corrected at the end of the construction activity. This shall include restoration of
soil depth, soil quality, permeability, and percent organic matter. Construction
practices must not cause damage to or compromise the design of permanent
landscape or infiltration areas.
• Locate excavated basement soil a reasonable distance behind the curb, such as in
the backyard or side yard area. This will increase the distance eroded soil must
travel to reach the storm sewer system. Cover soil piles until the soil is either used or
removed. Situate piles so sediment does not run into the street or adjoining yards.
• Backfill basement walls as soon as possible and rough grade the lot. This will
eliminate large soil mounds, which are highly erodible, and prepares the lot for
temporary cover, which will further reduce erosion potential.
• Remove excess soil from the site as soon as possible after backfilling. This will
eliminate any sediment loss from surplus fill.
• If a lot has a soil bank higher than the curb, install a trench or berm, moving the bank
several feet behind the curb. This will reduce the occurrence of gully and rill erosion
while providing a storage and settling area for stormwater.
• Stabilize the construction entrance where traffic will be leaving the construction site
and traveling on paved roads or other paved areas within 1,000 feet of the site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 195
• Provide for periodic street cleaning to remove any sediment that may have been
tracked out. Remove sediment by shoveling or sweeping and carefully move it to a
suitable disposal area where it will not be re-eroded.
• Backfill utility trenches that run up and down slopes within seven days. Cross-slope
trenches may remain open throughout construction to provide runoff interception and
sediment trapping, provided that they do not convey turbid runoff off site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 196
3.2 Runoff, Conveyance and Treatment BMPs
3.2.1 BMP C200: Interceptor Dike and Swale
3.2.1.1 Purpose
Provide a ridge of compacted soil, or a ridge with an upslope swale, at the top or base of a disturbed
slope or along the perimeter of a disturbed construction area to convey stormwater. Use the dike
and/or swale to intercept the runoff from unprotected areas and direct it to areas where erosion can
be controlled. This can prevent storm runoff from entering the work area or sediment-laden runoff
from leaving the construction site.
3.2.1.2 Conditions of Use
Where the runoff from an exposed site or disturbed slope must be conveyed to an erosion control
facility that can safely convey the stormwater.
• Locate upslope of a construction site to prevent runoff from entering disturbed area.
• When placed horizontally across a disturbed slope, it reduces the amount and
velocity of runoff flowing down the slope.
• Locate downslope to collect runoff from a disturbed area and direct it to a sediment
basin.
3.2.1.3 Design and Installation Specifications
• Stabilize dike and/or swale and channel with temporary or permanent vegetation or
other channel protection during construction.
• Channel requires a positive grade for drainage; steeper grades require channel
protection and check dams.
• Review construction for areas where overtopping may occur.
• Can be used at the top of new fill before vegetation is established.
• May be used as a permanent diversion channel to carry the runoff.
• Sub-basin tributary area should be one acre or less.
• Design capacity for the peak flow from a 10-year, 24-hour storm assuming a Type 1A
rainfall distribution (3-inches) for temporary facilities. Alternatively, use 1.6 times the
10-year, 1-hour flow indicated by WWHM. Design capacity for the peak flow from a
25-year, 24-hour storm for permanent facilities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 197
Interceptor Dikes
• Interceptor dikes shall meet the following criteria:
Top Width 2 feet minimum.
Height 1.5 feet minimum on berm.
Side Slope 2:1 or flatter.
Grade Depends on topography, however, dike system minimum is
0.5% and maximum is 1%
Compaction Minimum of 90 percent ASTM D698 standard proctor.
• Horizontal Spacing of Interceptor Dikes:
Average Slope Slope Percent Flowpath Length
20H:1V or less 3-5% 300 feet
(10 to 20)H:1V 5-10% 200 feet
(4 to 10)H:1V 10-25% 100 feet
(2 to 4)H:1V 25-50% 50 feet
• Stabilization depends on velocity and reach.
Slopes <5% Seed and mulch applied within 5 days of dike construction (see
BMP C121, Mulching).
Slopes 5 - 40% Dependent on runoff velocities and dike materials. Stabilization
should be done immediately using either sod or riprap or other
measures to avoid erosion.
• The upslope side of the dike shall provide positive drainage to the dike outlet. No
erosion shall occur at the outlet. Provide energy dissipation measures as necessary.
Sediment-laden runoff must be released through a sediment trapping facility.
• Minimize construction traffic over temporary dikes. Use temporary cross culverts for
channel crossing.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 198
Interceptor Swales
• Interceptor swales shall meet the following criteria:
Bottom Width 2 feet minimum; the bottom shall be level.
Depth 1-foot minimum.
Side Slope 2H:1V or flatter
Grade Maximum 5 percent, with positive drainage to a suitable outlet
(such as a sediment pond).
Stabilization Seed as per BMP C120, Temporary and Permanent Seeding, or
BMP C202, Channel Lining, 12 inches thick of riprap pressed
into the bank and extending at least 8 inches vertical from the
bottom.
• Inspect diversion dikes and interceptor swales once a week and after every rainfall.
Immediately remove sediment from the flow area.
• Repair damage caused by construction traffic or other activity before the end of each
working day.
• Check outlets and make timely repairs as needed to avoid gully formation. When the
area below the temporary diversion dike is permanently stabilized, remove the dike
and fill and stabilize the channel to blend with the natural surface.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 199
3.2.2 BMP C201: Grass-Lined Channels
3.2.2.1 Purpose
To provide a channel with a vegetative lining for conveyance of runoff. See Figure II-3-12 for typical
grass-lined channels.
3.2.2.2 Conditions of Use
This practice applies to construction sites where concentrated runoff needs to be contained to
prevent erosion or flooding.
• When a vegetative lining can provide sufficient stability for the channel cross section
and lower velocities of water (normally dependent on grade). This means that the
channel slopes are generally less than 5 percent and space is available for a
relatively large cross section.
• Typical uses include roadside ditches, channels at property boundaries, outlets for
diversions, and other channels and drainage ditches in low areas.
• Channels that will be vegetated should be installed before major earthwork and
hydroseeded with a bonded fiber matrix (BFM). The vegetation should be well
established (i.e., 75 percent cover) before water is allowed to flow in the ditch. With
channels that will have high flows, erosion control blankets should be installed over
the hydroseed. If vegetation cannot be established from seed before water is allowed
in the ditch, sod should be installed in the bottom of the ditch in lieu of hydromulch
and blankets.
3.2.2.3 Design and Installation Specifications
Locate the channel where it can conform to the topography and other features such as roads.
• Locate them to use natural drainage systems to the greatest extent possible.
• Avoid sharp changes in alignment or bends and changes in grade.
• Do not reshape the landscape to fit the drainage channel.
• Base the maximum design velocity on soil conditions, type of vegetation, and method
of revegetation, but at no times shall velocity exceed 5 feet/second. The channel
shall not be overtopped by the peak runoff from a 10-year, 24–hour storm, assuming
a type 1A rainfall distribution (3.0-inches). Alternatively, use 1.6 times the 10-year, 1-
hour flow indicated by an approved continuous runoff model to determine a flow rate
which the channel must contain.
• An established grass or vegetated lining is required before the channel can be used
to convey stormwater, unless stabilized with nets or blankets.
• If design velocity of a channel to be vegetated by seeding exceeds 2 ft/sec, a
temporary channel liner is required. Geotextile or special mulch protection, such as
fiberglass roving or straw and netting, provides stability until the vegetation is fully
established. See Figure II-3-13.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 200
• Remove check dams when the grass has matured sufficiently to protect the ditch or
swale unless the slope of the swale is greater than 4 percent. Seed and mulch the
area beneath the check dams immediately after dam removal.
• If vegetation is established by sodding, the permissible velocity for established
vegetation may be used and no temporary liner is needed.
• Do not subject grass-lined channel to sedimentation from disturbed areas. Use
sediment-trapping BMPs upstream of the channel.
• V-shaped grass channels generally apply where the quantity of water is small, such
as in short reaches along roadsides. The V-shaped cross section is least desirable
because it is difficult to stabilize the bottom where velocities may be high.
• Trapezoidal grass channels are used where runoff volumes are large and slope is
low so that velocities are non-erosive to vegetated linings. (Note: it is difficult to
construct small parabolic shaped channels.)
• Subsurface drainage, or riprap channel bottoms, may be necessary on sites that are
subject to prolonged wet conditions due to long duration flows or a high water table.
• Provide outlet protection at culvert ends and at channel intersections.
• Grass channels, at a minimum, should carry peak runoff for temporary construction
drainage facilities from the 10-year, 24-hour storm (3.0 inches) without eroding.
Where flood hazard exists, increase the capacity according to the potential damage.
• Grassed channel side slopes generally are constructed 3:1 or flatter to aid in the
establishment of vegetation and for maintenance.
• Construct channels a minimum of 0.2 foot larger around the periphery to allow for
soil bulking during seedbed preparations and sod buildup.
3.2.2.4 Maintenance Standards
During the establishment period, check grass-lined channels after every rainfall.
• After grass is established, periodically check the channel; check the channel after
every heavy rainfall event. Immediately make repairs.
• It is particularly important to check the channel outlet and all road crossings for bank
stability and evidence of piping or scour holes.
• Remove all significant sediment accumulations to maintain the designed carrying
capacity. Keep the grass in a healthy, vigorous condition at all times, since it is the
primary erosion protection for the channel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 201
Figure II-3-12. Typical Grass-Lined Channels
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 202
Figure II-3-13. Temporary Channel Liners
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 203
3.2.3 BMP C202: Channel Lining
3.2.3.1 Purpose
To protect erodible channels by providing a channel liner using either blankets or riprap.
3.2.3.2 Conditions of Use
• When natural soils or vegetated stabilized soils in a channel are not adequate to
prevent channel erosion.
• When a permanent ditch or pipe system is to be installed and a temporary measure
is needed.
• In almost all cases, synthetic and organic coconut blankets are more effective than
riprap for protecting channels from erosion. Blankets can be used with and without
vegetation. Blanketed channels can be designed to handle any expected flow and
longevity requirement. Some synthetic blankets have a predicted life span of 50
years or more, even in sunlight.
• The Federal Highway Administration recommends not using flexible liners whenever
the slope exceeds 10 percent or the shear stress exceeds 8 pounds per square foot.
3.2.3.3 Design and Installation Specifications
See BMP C122 for information on blankets.
Since riprap is used where erosion potential is high, construction must be sequenced so the riprap is
put in place with the minimum possible delay (see Figure II-3-14).
• Only disturb areas where riprap is to be placed if final preparation and placement of
the riprap can immediately follow the initial disturbance. Where riprap is used for
outlet protection, place the riprap before or in conjunction with the construction of the
pipe or channel so it is in place when the pipe or channel begins to operate.
• The designer, after determining the appropriate riprap size for stabilization, shall
consider that size to be a minimum size and then, based on riprap gradations
actually available in the area, select the size or sizes that equal or exceed the
minimum size. Consider the possibility of drainage structure damage by children
when selecting a riprap size, especially if there is nearby water or a gully in which to
toss the stones.
• Use field stone or quarry stone of approximately rectangular shape for the riprap.
The stone shall be hard and angular and of such quality that it will not disintegrate on
exposure to water or weathering and shall be suitable in all respects for the purpose
intended.
• Rubble concrete may be used, provided it has a density of at least 150 pounds per
cubic foot and otherwise meets the requirement of this standard and specification.
• Place a lining of engineering filter fabric (geotextile) between the riprap and the
underlying soil surface to prevent soil movement into or through the riprap. The
geotextile should be keyed in at the top of the bank.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 204
• Do not use filter fabric on slopes steeper than 1-1/2H:1V as slippage may occur. It
should be used in conjunction with a layer of coarse aggregate (granular filter
blanket) when the riprap to be placed is 12 inches and larger.
Figure II-3-14. Soil Erosion Protection – Rip Rap Protection
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 205
3.2.4 BMP C203: Water Bars
3.2.4.1 Purpose
A small ditch or ridge of material is constructed diagonally across a road or right-of-way to divert
stormwater runoff from the road surface, wheel tracks, or a shallow road ditch.
3.2.4.2 Conditions of Use
Clearing right-of-way and construction of access for power lines, pipelines, and other similar
installations often require long, narrow right-of-ways over sloping terrain. Disturbance and
compaction promotes gully formation in these cleared strips by increasing the volume and velocity of
runoff. Gully formation may be especially severe in tire tracks and ruts. To prevent gullying, runoff can
often be diverted across the width of the right-of-way to undisturbed areas by using small
predesigned diversions.
Give special consideration to each individual outlet area, as well as to the cumulative effect of added
diversions. Use gravel to stabilize the diversion where significant vehicular traffic is anticipated.
3.2.4.3 Design and Installation Specifications
Height: 8-inch minimum measured from the channel bottom to the top of the ridge.
• Side slope of channel: 2H:1V maximum; 3H:1V or flatter when vehicles will cross.
• Base width of ridge: 6-inch minimum.
• Locate them to use natural drainage systems and to discharge into well vegetated
stable areas.
• Guideline for Spacing:
Slope % Spacing (ft)
< 5 125
5 - 10 100
10 - 20 75
20 – 35 50
> 35 Use rock lined ditch
• Grade of water bar and angle: Select angle that results in ditch slope of less than 2
percent.
• Install as soon as clearing and grading is complete. Reconstruct when construction is
complete on a section when utilities are being installed.
• Compact the ridge when installed.
• Stabilize, seed, and mulch portions that are not subject to traffic. Gravel areas
crossed by vehicles.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 206
3.2.4.4 Maintenance Standards
Periodically inspect right-of-way diversions for wear and after every heavy rainfall inspect for erosion
damage.
• Immediately remove sediment from the flow area and repair the dike.
• Check outlet areas and make timely repairs as needed.
• When permanent road drainage is established and the area above the temporary
right-of-way diversion is permanently stabilized, remove the dike and fill the channel
to blend with the natural ground, and appropriately stabilize the disturbed area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 207
3.2.5 BMP C204: Pipe Slope Drains
3.2.5.1 Purpose
To use a pipe to convey stormwater anytime water needs to be diverted away from or over bare soil
to prevent gullies, channel erosion, and saturation of slide-prone soils.
3.2.5.2 Conditions of Use
Pipe slope drains should be used when a temporary or permanent stormwater conveyance is
needed to move the water down a steep slope to avoid erosion (Figure II-3-15).
On highway projects, pipe slope drains should be used at bridge ends to collect runoff and pipe it to
the base of the fill slopes along bridge approaches. These can be designed into a project and
included as bid items. Another use on road projects is to collect runoff from pavement and pipe it
away from side slopes. These are useful because there is generally lag time between having the first
lift of asphalt installed and the curbs, gutters, and permanent drainage installed. Used in conjunction
with sand bags or other temporary diversion devices, these will prevent massive amounts of
sediment from leaving a project.
Water can be collected; channeled with sand bags, Triangular Silt Dikes, berms, or other material;
and piped to temporary sediment ponds.
Pipe slope drains can be:
• Connected to new catch basins and used temporarily until all permanent piping is
installed;
• Used to drain water collected from aquifers exposed on cut slopes and convey it to
the base of the slope;
• Used to collect clean runoff from plastic sheeting and direct it away from exposed
soil;
• Installed in conjunction with silt fence to drain collected water to a controlled area;
• Used to divert small seasonal streams away from construction. They have been used
successfully on culvert replacement and extension jobs. Large flex pipe can be used
on larger streams during culvert removal, repair, or replacement; and,
• Connected to existing down spouts and roof drains and used to divert water away
from work areas during building renovation, demolition, and construction projects.
There are now several commercially available collectors that are attached to the pipe inlet and help
prevent erosion at the inlet.
3.2.5.3 Design and Installation Specifications
Size the pipe to convey the flow. The capacity for temporary drains shall be sufficient to handle the
peak flow from a 10-year, 24-hour storm event assuming a Type 1A rainfall distribution (3.0-inches).
Alternatively, use 1.6 times the 10-year, 1-hour flow indicated by WWHM. Size permanent pipe slope
drains for the 25-year, 24-hour peak flow.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 208
• Use care in clearing vegetated slopes for installation.
• Re-establish cover immediately on areas disturbed by installation.
• Use temporary drains on new cut or fill slopes.
• Use diversion dikes or swales to collect water at the top of the slope.
• Ensure that the entrance area is stable and large enough to direct flow into the pipe.
• Piping of water through the berm at the entrance area is a common failure mode.
• The entrance shall consist of a standard flared end section for culverts 12 inches and
larger with a minimum 6-inch metal toe plate to prevent runoff from undercutting the
pipe inlet. The slope of the entrance shall be at least 3 percent. Sand bags may also
be used at pipe entrances as a temporary measure.
• Thoroughly compact the soil around and under the pipe and entrance section to
prevent undercutting.
• Securely connect the flared inlet section to the slope drain and have watertight
connecting bands.
• Securely fasten, fuse or have gasketed, watertight fittings for the slope drain
sections, and securely anchor them into the soil.
• Install thrust blocks anytime 90 degree bends are utilized. Depending on size of pipe
and flow, these can be constructed with sand bags, straw bales staked in place, “T”
posts and wire, or ecology blocks.
• Pipe needs to be secured along its full length to prevent movement. This can be
done with steel “T” posts and wire. A post is installed on each side of the pipe and
the pipe is wired to them. This should be done every 10-20 feet of pipe length,
depending on the size of the pipe and quantity of water to be diverted.
• Use interceptor dikes to direct runoff into a slope drain. Ensure the height of the dike
is at least 1 foot higher at all points than at the top of the inlet pipe.
• Stabilize the area below the outlet with a riprap apron (see BMP C209 Outlet
Protection for the appropriate outlet material).
• If the pipe slope drain is conveying sediment-laden water, direct all flows into the
sediment trapping facility.
• Materials specifications for any permanent piped system shall be set by the local
government.
3.2.5.4 Maintenance Standards
Check inlet and outlet points regularly, especially after storms.
The inlet should be free of undercutting, and no water should be going around the point of entry. If
there are problems, the headwall should be reinforced with compacted earth or sand bags.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 209
• The outlet point should be free of erosion and installed with appropriate outlet
protection.
• For permanent installations, inspect pipe periodically for vandalism and physical
distress such as slides and wind-throw.
• Normally the pipe slope is so steep that clogging is not a problem with smooth wall
pipe; however, debris may become lodged in the pipe.
Figure II-3-15. Pipe Slope Drains
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 210
3.2.6 BMP C205: Subsurface Drains
3.2.6.1 Purpose
To intercept, collect, and convey groundwater to a satisfactory outlet, using a perforated pipe or
conduit below the ground surface. Subsurface drains are also known as “French drains.” The
perforated pipe provides a dewatering mechanism to drain excessively wet soils, provide a stable
base for construction, improve stability of structures with shallow foundations, or to reduce hydrostatic
pressure to improve slope stability.
3.2.6.2 Conditions of Use
Use when excessive water must be removed from the soil. The soil permeability, depth to water
table, and impervious layers are all factors which may govern the use of subsurface drains.
3.2.6.3 Design and Installation Specifications
• Relief drains
o Are used either to lower the water table in large, relatively flat areas, improve
the growth of vegetation, or to remove surface water.
o Are installed along a slope and drain in the direction of the slope.
o Can be installed in a grid pattern, a herringbone pattern, or a random pattern.
• Interceptor drains
o Are used to remove excess groundwater from a slope, stabilize steep slopes,
and lower the water table immediately below a slope to prevent the soil from
becoming saturated.
o Are installed perpendicular to a slope and drain to the side of the slope.
o Usually consist of a single pipe or series of single pipes instead of a
patterned layout.
• Depth and spacing considerations for interceptor drains
o The depth of an interceptor drain is determined primarily by the depth to
which the water table is to be lowered or the depth to a confining layer. For
practical reasons, the maximum depth is usually limited to 6 feet, with a
minimum cover of 2 feet to protect the conduit.
o The soil should have depth and sufficient permeability to permit installation of
an effective drainage system at a depth of 2 to 6 feet.
o An adequate outlet for the drainage system must be available either by
gravity or pumping.
o The quantity and quality of discharge needs to be accounted for in the
receiving stream (additional detention may be required).
o This standard does not apply to subsurface drains for building foundations or
deep excavations.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 211
• The capacity of an interceptor drain is determined by calculating the maximum rate
of groundwater flow to be intercepted. Therefore, it is good practice to make
complete subsurface investigations, including hydraulic conductivity of the soil,
before designing a subsurface drainage system.
• Drain sizing considerations
o Size subsurface drains to carry the required capacity without pressure flow.
The minimum diameter for a subsurface drain is 4 inches.
o The minimum velocity required to prevent silting is 1.4 feet per second. Grade
the line to achieve this velocity at a minimum. The maximum allowable
velocity using a sand-gravel filter or envelope is 9 feet per second.
• Use filter material and fabric around all drains for proper bedding and filtration of fine
materials. Envelopes and filters should surround the drain to a minimum of 3-inch
thickness.
• Empty the outlet of the subsurface drain into a sediment pond through a catch basin.
If free of sediment, it can then empty into a receiving channel, swale, or stable
vegetated area adequately protected from erosion and undermining.
• Construct the trench on a continuous grade with no reverse grades or low spots.
• Stabilize soft or yielding soils under the drain with gravel or other suitable material.
• Backfill immediately after placement of the pipe. Do not allow sections of pipe to
remain uncovered overnight or during a rainstorm. Place backfill material in the
trench in such a manner that the drain pipe is not displaced or damaged.
• Do not install permanent drains near trees as tree roots may clog the lines. Use solid
pipe with watertight connections where necessary to pass a subsurface drainage
system through a stand of trees.
• Outlet considerations
o Ensure that the outlet of a drain empties into a channel or other watercourse
above the normal water level.
o Secure an animal guard to the outlet end of the pipe to keep out rodents.
o Use at least 10 feet of corrugated metal, cast iron, or heavy-duty plastic
without perforations outlet pipe. Do not use an envelope or filter material
around the outlet pipe, and bury at least two-thirds of the pipe length.
o When outlet velocities exceed those allowable for the receiving stream,
provide outlet protection.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 212
3.2.6.4 Maintenance Standards
Check the subsurface drains periodically to ensure that they are free-flowing and not clogged with
sediment or roots.
• Keep the outlet clean and free of debris.
• Keep surface inlets open and free of sediment and other debris.
• Trees located too close to a subsurface drain often clog the system with their roots. If
a drain becomes clogged, relocate the drain or remove the trees as a last resort.
Plan the placement of the drain to minimize this problem.
• Where drains are crossed by heavy vehicles, check the line to ensure that it is not
crushed and use pipe material that can handle traffic loads.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 213
3.2.7 BMP C206: Level Spreader
3.2.7.1 Purpose
To provide a temporary outlet for dikes and diversions consisting of an excavated depression
constructed at zero grade across a slope. To convert concentrated runoff to sheet flow and release it
onto areas stabilized by existing vegetation or an engineered filter strip.
3.2.7.2 Conditions of Use
Used when a concentrated flow of water needs to be dispersed over a large area with existing stable
vegetation.
• Items to consider are:
o What is the risk of erosion or damage if the flow may become concentrated?
o Is an easement required if discharged to adjoining property?
o Most of the flow should be as groundwater and not as surface flow.
o Is there an unstable area downstream that cannot accept additional
groundwater?
• Use only where the slopes are gentle, the water volume is relatively low, and the soil
will adsorb most of the low flow events.
3.2.7.3 Design and Installation Specifications
Use above undisturbed areas that are stabilized by existing vegetation.
If the level spreader has any low points, flow will concentrate, create channels and may cause
erosion.
• Discharge area below the outlet must be uniform with a slope of less than 5H:1V.
• Construct outlet level in a stable, undisturbed soil profile (not on fill).
• Do not allow the runoff to reconcentrate after release unless intercepted by another
downstream measure.
• The grade of the channel for the last 20 feet of the dike or interceptor entering the
level spreader shall be less than or equal to 1 percent. The grade of the level
spreader shall be 0 percent to ensure uniform spreading of storm runoff.
• A 6-inch high gravel berm placed across the level lip shall consist of washed crushed
rock, 2- to 4-inch or 3/4-inch to 1½-inch size.
• Calculate the spreader length by estimating the peak flow expected from the 10-year,
24-hour design storm (3.0-inches). The length of the spreader shall be a minimum of
15 feet for 0.1 cubic feet per second and shall be 10 feet for each 0.1 cubic feet per
second there after to a maximum of 0.5 cubic feet per second per spreader. Use
multiple spreaders for higher flows.
• The width of the spreader should be at least 6 feet.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 214
• The depth of the spreader as measured from the lip should be at least 6 inches and it
should be uniform across the entire length.
• Level spreaders shall be setback from the property line unless there is an easement
for flow.
• Level spreaders, when installed every so often in grassy swales, keep the flows from
concentrating. Materials that can be used include sand bags, lumber, logs, concrete,
and pipe. To function properly, the material needs to be installed level and on
contour. Figure II-3-16 and Figure II-3-17 provide a cross-section and a detail of a
level spreader.
3.2.7.4 Maintenance Standards
The spreader should be inspected after every runoff event to ensure proper function.
• The contractor should avoid the placement of any material on the structure and
should prevent construction traffic from crossing over the structure.
• If the spreader is damaged by construction traffic, immediately repair it.
Figure II-3-16. Cross-Section of a Level Spreader
Figure II-3-17. Detail of a Level Spreader
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 215
3.2.8 BMP C207: Check Dams
3.2.8.1 Purpose
Construction of small dams across a swale or ditch reduces the velocity of concentrated flow and
dissipates energy at the check dam.
3.2.8.2 Conditions of Use
Where temporary channels or permanent channels are not yet vegetated, channel lining is infeasible,
and velocity checks are required.
• Do not place check dams in streams unless approved by the State Department of
Fish and Wildlife. Do not place check dams in wetlands without approval from a
permitting agency.
• Do not place check dams below the expected backwater from any salmonid bearing
water between September 15 and June 15 to ensure that there is no loss of high flow
refuge habitat for overwintering juvenile salmonids and emergent salmonid fry.
3.2.8.3 Design and Installation Specifications
Whatever material is used, the dam should form a triangle when viewed from the side. This prevents
undercutting as water flows over the face of the dam rather than falling directly onto the ditch bottom.
Check dams in association with sumps work more effectively at slowing flow and retaining sediment
than just a check dam alone. A deep sump should be provided immediately upstream of the check
dam.
• In some cases, if carefully located and designed, check dams can remain as
permanent installations with very minor regrading. They may be left as either
spillways, in which case accumulated sediment would be graded and seeded, or as
check dams to prevent further sediment from leaving the site.
• Check dams can be constructed of either rock or pea-gravel filled bags. Numerous
new products are also available for this purpose. They tend to be re-usable, quick
and easy to install, effective, and cost efficient.
• Check dams should be placed perpendicular to the flow of water.
• The maximum spacing between the dams shall be such that the toe of the upstream
dam is at the same elevation as the top of the downstream dam.
• Keep a maximum height of 2 feet at the center of the dam.
• Keep the center of the check dam at least 12 inches lower than the outer edges at
natural ground elevation.
• Keep the side slopes of the check dam at 2H:1V or flatter.
• Key the stone into the ditch banks and extend it beyond the abutments a minimum of
18 inches to avoid washouts from overflow around the dam.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 216
• Use filter fabric foundation under a rock or sand bag check dam. If a blanket ditch
liner is used, this is not necessary. A piece of organic or synthetic blanket cut to fit
will also work for this purpose.
• Construct rock check dams of appropriately sized rock. Place the rock by hand or by
mechanical means (no dumping of rock to form dam) to achieve complete coverage
of the ditch or swale and to ensure that the center of the dam is lower than the
edges. The rock used must be large enough to stay in place given the expected
design flow through the channel.
• In the case of grass-lined ditches and swales, remove all check dams and
accumulated sediment when the grass has matured sufficiently to protect the ditch or
swale - unless the slope of the swale is greater than 4 percent. Seed and mulch the
area beneath the check dams immediately after dam removal.
• Ensure that channel appurtenances, such as culvert entrances below check dams,
are not subject to damage or blockage from displaced stones. Figure II-3-18 depicts
a typical rock check dam.
3.2.8.4 Maintenance Standards
Monitor check dams for performance and sediment accumulation during and after each runoff
producing rainfall. Remove sediment when it reaches one half the sump depth.
• Anticipate submergence and deposition above the check dam and erosion from high
flows around the edges of the dam.
• If significant erosion occurs between dams, install a protective riprap liner in that
portion of the channel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 217
Figure II-3-18. Check Dams
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 218
3.2.9 BMP C208: Triangular Silt Dike (Geotextile-Encased Check Dam)
3.2.9.1 Purpose
Triangular silt dikes (TSDs) may be used as check dams, for perimeter protection, for temporary soil
stockpile protection, for drop inlet protection, or as a temporary interceptor dike (see Figure II-3-19
and Figure II-3-20).
3.2.9.2 Conditions of Use
May be used in place of straw bales for temporary check dams in ditches of any dimension.
• May be used on soil or pavement with adhesive or staples.
• TSDs have been used to build temporary:
o sediment ponds
o diversion ditches
o concrete wash out facilities
o curbing
o water bars
o level spreaders
o berms
3.2.9.3 Design and Installation Specifications
Made of urethane foam sewn into a woven geosynthetic fabric.
It is triangular, 10 inches to 14 inches high in the center, with a 20-inch to 28-inch base. A 2–foot
apron extends beyond both sides of the triangle along its standard section of 7 feet. A sleeve at one
end allows attachment of additional sections as needed.
• Install with ends curved up to prevent water from flowing around the ends.
• The fabric flaps and check dam units are attached to the ground with wire staples.
Wire staples should be No. 11 gauge wire and should be 200 mm to 300 mm in
length.
• When multiple units are installed, the sleeve of fabric at the end of the unit shall
overlap the abutting unit and be stapled.
• Check dams should be located and installed as soon as construction will allow.
• Check dams should be placed perpendicular to the flow of water.
• When used as check dams, the leading edge must be secured with rocks, sandbags,
or a small key slot and staples.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 219
3.2.9.4 Maintenance Standards
Monitor triangular silt dikes for performance and sediment accumulation during and after each runoff
producing rainfall. Remove sediment when it reaches one half the height of the dam.
Anticipate submergence and deposition above the triangular silt dam and erosion from high flows
around the edges of the dam. Immediately repair any damage or undercutting of the dam.
In the case of grass-lined ditches and swales, remove check dams and accumulated sediment when
the grass has matured sufficiently to protect the ditch or swale, unless the slope of the swale is
greater than 4 percent. Seed and mulch the area beneath the check dams immediately after dam
removal.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 220
Figure II-3-19. Sediment Barrier – Triangular Sediment Filter Dikes
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 221
Figure II-3-20. Sediment Barrier – Geosynthetic Dike
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 222
3.2.10 BMP C209: Outlet Protection
3.2.10.1 Purpose
Outlet protection prevents scour at conveyance outlets and minimizes the potential for downstream
erosion by reducing the velocity of concentrated stormwater flows.
3.2.10.2 Conditions of Use
Outlet protection is required at the outlets of all ponds, pipes, ditches, or other conveyances, and
where runoff is conveyed to a natural or manmade drainage feature such as a stream, wetland, lake,
or ditch.
3.2.10.3 Design and Installation Specifications
Protect the receiving channel at the outlet of a culvert from erosion by rock lining a minimum of 6 feet
downstream and extending rock lining up the channel sides a minimum of 1–foot above the
maximum tailwater elevation or 1-foot above the crown, whichever is higher. For large pipes (more
than 18 inches in diameter), the outlet protection lining of the channel is lengthened to four times the
diameter of the culvert.
• Standard wingwalls, and tapered outlets and paved channels should also be
considered when appropriate for permanent culvert outlet protection. (See the
WSDOT Hydraulic Manual, available through WSDOT Engineering Publications).
• Organic or synthetic erosion blankets, with or without vegetation, may be, cheaper,
and easier to install than rock. Materials can be chosen using manufacturer product
specifications. ASTM test results are available for most products and the designer
can choose the correct material for the expected flow.
• With low flows, vegetation (including sod) can be effective.
• Use the following guidelines for riprap outlet protection:
o If the discharge velocity at the outlet is less than 5 feet per second (pipe
slope less than 1 percent), use 2-inch to 8-inch riprap. Minimum thickness is
1-foot.
o For 5 to 10 feet per second discharge velocity at the outlet (pipe slope less
than 3 percent), use 24-inch to 4-foot riprap. Minimum thickness is 2 feet.
o For outlets at the base of steep slope pipes (pipe slope greater than 10
percent), an engineered energy dissipater shall be used.
• Always use filter fabric or erosion control blankets under riprap to prevent scour and
channel erosion.
• New pipe outfalls can provide an opportunity for low-cost fish habitat improvements.
For example, an alcove of low-velocity water can be created by constructing the pipe
outfall and associated energy dissipater back from the stream edge and digging a
channel, over-widened to the upstream side, from the outfall. Overwintering juvenile
and migrating adult salmonids may use the alcove as shelter during high flows. Bank
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 223
stabilization, bioengineering, and habitat features may be required for disturbed
areas. See Volume V for more information on outfall system design.
3.2.10.4 Maintenance Standards
• Inspect and repair as needed.
• Add rock as needed to maintain the intended function.
• Clean energy dissipater if sediment builds up.
Figure II-3-21. No Figure Placeholder
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 224
3.2.11 BMP C220: Storm Drain Inlet Protection
3.2.11.1 Purpose
To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the
disturbed area.
3.2.11.2 Conditions of Use
Where storm drain inlets are to be made operational before permanent stabilization of the disturbed
drainage area.
Provide protection for all storm drain inlets downslope and within 500 feet of a disturbed or
construction area, unless the runoff that enters the catch basin will be conveyed to a sediment pond
or trap. Inlet protection may be used anywhere to protect the drainage system. It is likely that the
drainage system will still require cleaning.
Table II-3-9 lists several options for inlet protection. All of the methods for storm drain inlet protection
are prone to plugging and require a high frequency of maintenance. Drainage areas should be limited
to 1 acre or less. Emergency overflows may be required where stormwater ponding would cause a
hazard. If an emergency overflow is provided, additional end-of-pipe treatment may be required.
Only bag filter type catch basin filters (per Section 3.2.11.3) are allowed within the right of way.
Table II-3-9. Storm Drain Inlet Protection
Type of Inlet
Protection
Emergency
Overflow
Applicable for
Paved/Earthen
Surfaces
Conditions of Use
Excavated drop inlet
protection
Yes, temporary
flooding will
occur
Earthen Applicable for heavy flows. Easy to
maintain. Large area requirement:
30’ x 30’ per acre.
Block and gravel drop
filter
Yes Paved or earthen Applicable for heavy concentrated
flows. Will not pond.
Gravel and mesh
filter
No Paved Applicable for heavy concentrated
flows. Will pond. Can withstand
traffic.
Catch basin filters Yes Paved or earthen Frequent maintenance required.
Curb inlet protection
with a wooden weir
Small capacity
overflow
Paved Used for sturdy, more compact
installation.
Block and gravel curb
inlet protection
Yes Paved Sturdy, but limited filtration.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 225
3.2.11.3 Design and Installation Specifications
Excavated Drop Inlet Protection
An excavated impoundment around the storm drain. Sediment settles out of the stormwater prior to
entering the storm drain.
• Depth 1 to 2 feet, as measured from the crest of the inlet structure.
• Side slopes of excavation no steeper than 2H:1V.
• Minimum volume of excavation 35 cubic yards.
• Shape basin to fit site with longest dimension oriented toward the longest inflow
area.
• Install provisions for draining to prevent standing water problems.
• Clear the area of all debris.
• Grade the approach to the inlet uniformly.
• Drill weep holes into the side of the inlet.
• Protect weep holes with screen wire and washed aggregate.
• Seal weep holes when removing structure and stabilizing area.
• It may be necessary to build a temporary dike to the down slope side of the structure
to prevent bypass flow.
Block and Gravel Filter
A barrier formed around the storm drain inlet with standard concrete blocks and gravel. See Figure II-
3-22.
• Height 1 to 2 feet above inlet.
• Recess the first row 2 inches into the ground for stability.
• Support subsequent courses by placing a piece of 2x4 lumber through the block
opening.
• Do not use mortar.
• Lay some blocks in the bottom row on their side for dewatering the pool.
• Place hardware cloth or comparable wire mesh with ½-inch openings over all block
openings.
• Place gravel just below the top of blocks on slopes of 2H:1V or flatter.
• An alternative design is a gravel donut.
• Inlet slope of 3H:1V.
• Outlet slope of 2H:1V.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 226
• 1-foot wide level stone area between the structure and the inlet.
• Inlet slope stones 3 inches in diameter or larger.
• Outlet slope use gravel ½- to ¾-inch at a minimum thickness of 1-foot.
Gravel and Wire Mesh Filter
A gravel barrier placed over the top of the inlet (see Figure II-3-23). This structure does not provide
an overflow.
• Hardware cloth or comparable wire mesh with ½-inch openings.
• Coarse aggregate.
• Height 1-foot or more, 18 inches wider than inlet on all sides.
• Place wire mesh over the drop inlet so that the wire extends a minimum of 1-foot
beyond each side of the inlet structure.
• If more than one strip of mesh is necessary, overlap the strips.
• Place coarse aggregate over the wire mesh.
• The depth of the gravel should be at least 12 inches over the entire inlet opening and
extend at least 18 inches on all sides.
Catchbasin Filters
Inserts (Figure II-3-24) shall be designed by the manufacturer for use at construction sites. The
limited sediment storage capacity increases the frequency of inspection and maintenance required,
which may be daily for heavy sediment loads. The maintenance requirements can be reduced by
combining a catchbasin filter with another type of inlet protection. This type of inlet protection provides
flow bypass without overflow and therefore may be a better method for inlets located along active
rights-of-way. See Figure II-C-46 for one example.
• Should have a minimum of 5 cubic feet of storage.
• Dewatering provisions.
• High-flow bypass that will not clog under normal use at a construction site.
• The catchbasin filter is inserted in the catchbasin just below the grating.
• Only bag filter type catch basin filters are allowed in the City right-of-way.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 227
Figure II-3-22. Drop Inlet with Block and Gravel Filter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 228
Figure II-3-23. Gravel and Wire Mesh Filter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 229
Figure II-3-24. Catchbasin Filter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 230
Curb Inlet Protection with Wooden Weir
Barrier formed around a curb inlet with a wooden frame and gravel.
• Wire mesh with ½-inch openings.
• Extra strength filter cloth.
• Construct a frame.
• Attach the wire and filter fabric to the frame.
• Pile coarse washed aggregate against the wire and fabric.
• Place weight on frame anchors.
Block and Gravel Curb Inlet Protection
Barrier formed around an inlet with concrete blocks and gravel. See Figure II-3-25.
• Wire mesh with ½-inch openings.
• Place two concrete blocks on their sides abutting the curb at either side of the inlet
opening. These are spacer blocks.
• Place a 2x4 stud through the outer holes of each spacer block to align the front
blocks.
• Place blocks on their sides across the front of the inlet and abutting the spacer
blocks.
• Place wire mesh over the outside vertical face.
• Pile coarse aggregate against the wire to the top of the barrier.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 231
Figure II-3-25. Block and Gravel Curb Inlet Protection
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 232
Curb and Gutter Sediment Barrier
Sandbag or rock berm (riprap and aggregate) 3 feet high and 3 feet wide in a horseshoe shape. See
Figure II-3-26.
• Construct a horseshoe shaped berm, faced with coarse aggregate if using riprap,
3 feet high and 3 feet wide, at least 2 feet from the inlet.
• Construct a horseshoe shaped sedimentation trap on the outside of the berm sized
to sediment trap standards for protecting a culvert inlet.
3.2.11.4 Maintenance Standards
Inspect catch basin filters frequently, especially after storm events. If the insert becomes clogged,
clean or replace it.
• For systems using stone filters: If the stone filter becomes clogged with sediment, the
stones must be pulled away from the inlet and cleaned or replaced. Since cleaning of
gravel at a construction site may be difficult, an alternative approach would be to use
the clogged stone as fill and put fresh stone around the inlet.
• Do not wash sediment into storm drains while cleaning. Spread all excavated
material evenly over the surrounding land area or stockpile and stabilize as
appropriate.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 233
Figure II-3-26. Curb and Gutter Sediment Barrier
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 234
3.2.12 BMP C231: Brush Barrier
3.2.12.1 Purpose
The purpose of brush barriers is to reduce the transport of coarse sediment from a construction site
by providing a temporary physical barrier to sediment and reducing the runoff velocities of overland
flow.
3.2.12.2 Conditions of Use
• Brush barriers may be used downslope of all disturbed areas of less than one-
quarter acre.
• Brush barriers are not intended to treat concentrated flows, nor are they intended to
treat substantial amounts of overland flow. Any concentrated flows must be
conveyed through the drainage system to a sediment pond. The only circumstance in
which overland flow can be treated solely by a barrier, rather than by a sediment
pond, is when the area draining to the barrier is small.
• Only install brush barriers on contours.
3.2.12.3 Design and Installation Specifications
• Height 2 feet (minimum) to 5 feet (maximum).
• Width 5 feet at base (minimum) to 15 feet (maximum).
• Filter fabric (geotextile) may be anchored over the brush berm to enhance the
filtration ability of the barrier. Ten-ounce burlap is an adequate alternative to filter
fabric.
• Chipped site vegetation, composted mulch, or wood-based mulch (hog fuel) can be
used to construct brush barriers.
• A 100 percent biodegradable installation can be constructed using 10-ounce burlap
held in place by wooden stakes. Figure II-3-27 depicts a typical brush barrier.
3.2.12.4 Maintenance Standards
• Do not allow erosion or concentrated runoff under or around the barrier. If
concentrated flows are bypassing the barrier, it must be expanded or augmented by
toed-in filter fabric.
• Maintain the dimensions of the barrier.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 235
Figure II-3-27. Brush Barrier
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 236
3.2.13 BMP C232: Gravel Filter Berm
3.2.13.1 Purpose
A gravel filter berm is constructed on rights-of-way or traffic areas within a construction site to retain
sediment by using a filter berm of gravel or crushed rock.
3.2.13.2 Conditions of Use
Where a temporary measure is needed to retain sediment from rights-of-way or in traffic areas on
construction sites.
3.2.13.3 Design and Installation Specifications
Berm material shall be ¾ to 3 inches in size, washed well-graded gravel or crushed rock, with less
than 5 percent fines.
• Space berms:
o Every 300 feet on slopes less than 5 percent
o Every 200 feet on slopes between 5 percent and 10 percent
o Every 100 feet on slopes greater than 10 percent
• Berm dimensions:
o 1 foot high with 3:1 side slopes
o 8 linear feet per 1 cubic foot per second runoff based on the 10-year, 24-hour
design storm (3.0-inches)
3.2.13.4 Maintenance Standards
Regular inspection is required. Remove sediment and replace filter material as needed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 237
3.2.14 BMP C233: Silt Fence
3.2.14.1 Purpose
Use of a silt fence reduces the transport of coarse sediment from a construction site by providing a
temporary physical barrier to sediment and reducing the runoff velocities of overland flow. See Figure
II-3-28 for details on silt fence construction.
3.2.14.2 Conditions of Use
Silt fence may be used downslope of all disturbed areas.
• Silt fence is not intended to treat concentrated flows, nor is it intended to treat
substantial amounts of overland flow. Convey any concentrated flows through the
drainage system to a sediment pond. The only circumstance in which overland flow
can be treated solely by a silt fence, rather than by a sediment pond, is when the
area draining to the fence is one acre or less and flow rates are less than 0.5 cfs.
• Do not construct silt fences in streams or use them in V-shaped ditches. They are
not an adequate method of silt control for anything deeper than sheet or overland
flow.
3.2.14.3 Design and Installation Specifications
Drainage area of 1 acre or less or in combination with sediment basin on a larger site.
Maximum slope steepness (perpendicular to fence line) 1H:1V.
• Maximum sheet or overland flow path length to the fence of 100 feet.
• No flows greater than 0.5 cubic feet per second.
• The geotextile used shall meet the following standards. All geotextile properties listed
below are minimum average roll values (i.e., the test result for any sampled roll in a
lot shall meet or exceed the values shown in Table II-3-10).
Table II-3-10. Geotextile Standards
Polymeric Mesh AOS (ASTM D4751) 0.60 mm maximum for slit film wovens
(#30 sieve). 0.30 mm maximum for all other
geotextile types (#50 sieve). 0.15 mm minimum
for all fabric types (#100 sieve).
Water Permittivity (ASTM D4491) 0.02 sec-1 minimum
Grab Tensile Strength (ASTM D4632) 180 lbs. minimum for extra strength fabric.
100 lbs. minimum for standard strength fabric.
Grab Tensile Strength (ASTM D4632) 30% maximum
Ultraviolet Resistance (ASTM D4355) 70% minimum
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 238
• Support standard strength fabrics with wire mesh, chicken wire, 2-inch x 2-inch wire,
safety fence, or jute mesh to increase the strength of the fabric. Silt fence materials
are available that have synthetic mesh backing attached.
• Filter fabric material shall contain ultraviolet ray inhibitors and stabilizers to provide a
minimum of six months of expected usable construction life at a temperature range
of 0° to 120° Fahrenheit.
• 100 percent biodegradable silt fence is available that is strong and long lasting.
• The following are standard design and installation methods. Refer to Figure II-3-28
for standard silt fence details.
o Install and maintain temporary silt fences at the locations shown in the plans.
Install the silt fences in the areas of clearing, grading, or drainage prior to
starting those activities. Do not consider a silt fence temporary if the silt fence
must function beyond the life of the contract. The silt fence shall prevent soil
carried by runoff water from going beneath, through, or over the top of the silt
fence, but shall allow the water to pass through the fence.
o The minimum height of the top of silt fence shall be 2 feet and the maximum
height shall be 2½ feet above the original ground surface.
o Sew the geotextile together at the point of manufacture, or at an approved
location as determined by the Engineer, to form geotextile lengths as
required. Locate all sewn seams at a support post. Alternatively, two sections
of silt fence can be overlapped, provided the Contractor can demonstrate, to
the satisfaction of the Engineer, that the overlap is long enough and adjacent
fence sections are close enough together to prevent silt laden water from
escaping through the fence at the overlap.
o Attach the geotextile on the up-slope side of the posts and support system
with staples, wire, or in accordance with the manufacturer's
recommendations. Attach the geotextile to the posts in a manner that reduces
the potential for geotextile tearing at the staples, wire, or other connection
device. Silt fence back-up support for the geotextile in the form of a wire or
plastic mesh is dependent on the properties of the geotextile selected for use.
If wire or plastic back-up mesh is used, fasten the mesh securely to the up-
slope of the posts with the geotextile being up-slope of the mesh back-up
support.
o Bury the geotextile at the bottom of the fence in a trench to a minimum depth
of 4 inches below the ground surface. Backfill the trench and tamp the soil in
place over the buried portion of the geotextile, such that no flow can pass
beneath the fence and scouring can not occur. When wire or polymeric back-
up support mesh is used, the wire or polymeric mesh shall extend into the
trench a minimum of 3 inches.
o Drive fence posts in to a minimum depth of 18 inches. A minimum depth of
12 inches is allowed if topsoil or other soft subgrade soil is not present and a
minimum depth of 18 inches cannot be reached. Increase fence post depths
by 6 inches if the fence is located on slopes of 3H:1V or steeper and the
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 239
slope is perpendicular to the fence. If required post depths cannot be
obtained, adequately secure the posts by bracing or guying to prevent
overturning of the fence due to sediment loading.
o Locate the silt fences on contour as much as possible, except at the ends of
the fence, where the fence shall be turned uphill such that the silt fence
captures the runoff water and prevents water from flowing around the end of
the fence.
o If the fence must cross contours, with the exception of the ends of the fence,
place gravel check dams perpendicular to the back of the fence to minimize
concentrated flow and erosion along the back of the fence. The gravel check
dams shall be approximately 1-foot deep at the back of the fence and be
perpendicular to the fence at the same elevation until the top of the check
dam intercepts the ground surface behind the fence. The gravel check dams
shall consist of crushed surfacing base course, gravel backfill for walls, or
shoulder ballast. Locate the gravel check dams every 10 feet along the fence
where the fence must cross contours. The slope of the fence line where
contours must be crossed shall not be steeper than 3H:1V.
o Use wood, steel or equivalent posts. Wood posts shall have minimum
dimensions of 2 inches by 2 inches by 3 feet minimum length, and shall be
free of defects such as knots, splits, or gouges. Steel posts shall consist of
either size No. 6 rebar or larger; ASTM A120 steel pipe with a minimum
diameter of 1-inch; U, T, L, or C shape steel posts with a minimum weight of
1.35 pounds per foot; or other steel posts having equivalent strength and
bending resistance to the post sizes listed. The spacing of the support posts
shall be a maximum of 6 feet.
o Fence back-up support, if used, shall consist of steel wire with a maximum
mesh spacing of 2 inches, or a prefabricated polymeric mesh. The strength of
the wire or polymeric mesh shall be equivalent to or greater than 180 pounds
grab tensile strength. The polymeric mesh must be as resistant to ultraviolet
radiation as the geotextile it supports.
• Specification details for silt fence installation using the slicing method follow. Refer to
Figure II-3-29 for slicing method details.
o The base of both end posts must be at least 2 to 4 inches above the top of
the silt fence fabric on the middle posts for ditch checks to drain properly. Use
a hand level or string level, if necessary, to mark base points before
installation.
o Install posts 3 to 4 feet apart in critical retention areas and a minimum of
6 feet apart in standard applications.
o Install posts 24 inches deep on the downstream side of the silt fence, and as
close as possible to the fabric, enabling posts to support the fabric from
upstream water pressure.
o Install posts with the nipples facing away from the silt fence fabric.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 240
o Attach the fabric to each post with three ties, all spaced within the top
8 inches of the fabric. Attach each tie diagonally 45 degrees through the
fabric, with each puncture at least 1 inch vertically apart. In addition, each tie
should be positioned to hang on a post nipple when tightening to prevent
sagging.
o Wrap approximately 6 inches of fabric around the end posts and secure with
3 ties.
o No more than 24 inches of a 36-inch fabric is allowed above ground level.
o The rope lock system must be used in all ditch check applications.
o The installation should be checked and corrected for any deviation before
compaction. Use a flat-bladed shovel to tuck fabric deeper into the ground, if
necessary.
o Compaction is vitally important for effective results. Compact the soil
immediately next to the silt fence fabric with the front wheel of a tractor, skid
steer, or roller exerting at least 60 pounds per square inch. Compact the
upstream side first and then each side twice for a total of four trips.
3.2.14.4 Maintenance Standards
• Repair any damage immediately.
• If concentrated flows are evident uphill of the fence, intercept and convey them to a
sediment pond.
• It is important to check the uphill side of the fence for signs of the fence clogging,
acting as a barrier to flow, and then causing channelization of flows parallel to the
fence. If this occurs, replace the fence or remove the trapped sediment.
• Remove sediment deposits when the deposit reaches approximately one-third the
height of the silt fence, or install a second silt fence.
• If the filter fabric (geotextile) has deteriorated due to ultraviolet breakdown, replace it.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 241
Figure II-3-28. Silt Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 242
Figure II-3-29. Silt Fence Installation by Slicing
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 243
3.2.15 BMP C234: Vegetated Strip
3.2.15.1 Purpose
Vegetated strips reduce the transport of coarse sediment from a construction site by providing a
temporary physical barrier to sediment and reducing the runoff velocities of overland flow.
3.2.15.2 Conditions of Use
Vegetated strips may be used downslope of all disturbed areas.
Vegetated strips are not intended to treat concentrated flows, nor are they intended to treat
substantial amounts of overland flow. Convey any concentrated flows through the drainage system to
a sediment pond. The only circumstance in which overland flow can be treated solely by a strip,
rather than by a sediment pond, is when the criteria shown in Table II-3-11 are met.
Table II-3-11. Vegetated Strips
Average Slope Slope Percent Flowpath Length
1.5H:1V or less 67% or less 100 feet
2H:1V or less 50% or less 115 feet
4H:1V or less 25% or less 150 feet
6H:1V or less 16.7% or less 200 feet
10H:1V or less 10% or less 250 feet
3.2.15.3 Design and Installation Specifications
The vegetated strip shall consist of a minimum of a 25-foot wide continuous strip of dense vegetation
with permeable topsoil. Grass-covered, landscaped areas are generally not adequate because the
volume of sediment overwhelms the grass. Ideally, vegetated strips shall consist of undisturbed
native growth with a well-developed soil that allows for infiltration of runoff.
• The slope within the strip shall not exceed 4H:1V.
• Delineate the uphill boundary of the vegetated strip with clearing limits.
3.2.15.4 Maintenance Standards
• Seed any areas damaged by erosion or construction activity immediately and
protected with mulch.
• If more than 5 feet of the original vegetated strip width has had vegetation removed
or is being eroded, install sod.
• If there are indications that concentrated flows are traveling across the vegetated
strip, surface water controls must be installed to reduce the flows entering the
vegetated strip, or install additional perimeter protection.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 244
3.2.16 BMP C235: Straw Wattles
3.2.16.1 Purpose
Straw wattles are temporary erosion and sediment control barriers consisting of straw that is wrapped
in biodegradable tubular plastic or similar encasing material. They reduce the velocity and can spread
the flow of rill and sheet runoff, and can capture and retain sediment. Straw wattles are typically 8 to
10 inches in diameter and 25 to 30 feet in length. The wattles are placed in shallow trenches and
staked along the contour of disturbed or newly constructed slopes. See Figure II-3-30 for typical
construction details.
3.2.16.2 Conditions of Use
• Disturbed areas that require immediate erosion protection.
• Exposed soils during the period of short construction delays.
• On slopes requiring stabilization until permanent vegetation can be established.
• Straw wattles are effective for one to two seasons.
• If conditions are appropriate, wattles can be staked to the ground using live cuttings
for added revegetation.
3.2.16.3 Design Criteria
• It is critical that wattles are installed perpendicular to the flow direction and parallel to
the slope contour.
• Dig narrow trenches across the slope on contour to a depth of 3 to 5 inches on clay
soils and soils with gradual slopes. On loose soils, steep slopes, and areas with high
rainfall, dig the trenches to a depth of 5 to 7 inches, or 1/2 to 2/3 of the thickness of
the wattle.
• Start building trenches and installing wattles from the base of the slope and work up.
Excavated material should be spread evenly along the uphill slope and compacted
using hand tamping or other methods.
• Construct trenches at contour intervals of 3 to 30 feet apart depending on the
steepness of the slope, soil type, and rainfall. The steeper the slope, the closer
together the trenches shall be.
• Install the wattles snugly into the trenches and abut tightly end to end. Do not overlap
the ends. Rilling can occur beneath wattles if not properly entrenched, and water can
pass between wattles if not tightly abutted.
• Install stakes at each end of the wattle, and at 4-foot centers along entire length of
wattle.
• If required, install pilot holes for the stakes using a straight bar to drive holes through
the wattle and into the soil.
• At a minimum, wooden stakes should be approximately 3/4 x 3/4 x 24 inches. Live
cuttings or 3/8-inch rebar can also be used for stakes.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 245
• Stakes should be driven through the middle of the wattle, leaving 2 to 3 inches of the
stake protruding above the wattle.
3.2.16.4 Maintenance Standards
• Wattles may require maintenance to ensure they are in contact with soil and
thoroughly entrenched, especially after significant rainfall on steep sandy soils.
• Inspect the slope after significant storms and repair any areas where wattles are not
tightly abutted or water has scoured beneath the wattles.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 246
Figure II-3-30. Straw Wattles
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 247
3.2.17 BMP C240: Sediment Trap
3.2.17.1 Purpose
A sediment trap is a small temporary ponding area with a gravel outlet used to collect and store
sediment from sites cleared and/or graded during construction. Install sediment traps, along with
other perimeter controls, before any land disturbance takes place in the drainage area.
3.2.17.2 Conditions of Use
Prior to leaving a construction site, stormwater runoff must pass through a sediment pond or trap or
other appropriate sediment removal best management practice. Non-engineered sediment traps may
be used on-site prior to an engineered sediment trap or sediment pond to provide additional sediment
removal capacity.
Sediment traps are intended for use on sites where the tributary drainage area is less than 3 acres,
with no unusual drainage features, and a projected build-out time of six months or less. The sediment
trap is a temporary measure (with a design life of approximately 6 months) and shall be maintained
until the site area is permanently protected against erosion by the installation of vegetation and/or
structures.
Sediment traps and ponds are only effective in removing sediment down to about the medium silt
size fraction. Runoff with sediment of finer grades (fine silt and clay) will pass through untreated,
emphasizing the need to control erosion to the maximum extent first.
Whenever possible, discharge sediment-laden water into onsite, relatively level, vegetated areas
(see BMP C234 – Vegetated Strip). Do not use vegetated wetlands for this purpose. All projects that
are constructing permanent detention facilities for runoff quantity control should use the rough-graded
or final-graded permanent facilities for traps and ponds. This includes combined facilities and
infiltration facilities. When permanent facilities are used as temporary sedimentation facilities, the
surface area requirement of a sediment trap or pond must be met. If the surface area requirements
are larger than the surface area of the permanent facility, then the trap or pond shall be enlarged to
comply with the surface area requirement. The permanent pond shall also be divided into two cells as
required for sediment ponds.
Use of infiltration facilities for sedimentation basins during construction tends to clog the soils and
reduce their capacity to infiltrate. If infiltration facilities are to be used, the sides and bottom of the
facility must only be rough excavated to a minimum of 2 feet above final grade. Final grading of the
infiltration facility shall occur only when all contributing drainage areas are fully stabilized. The
infiltration pretreatment facility should be fully constructed and used with the sedimentation basin to
help prevent clogging.
Either a permanent control structure or the temporary control structure described in BMP C241 -
Temporary Sediment Pond can be used. If a permanent control structure is used, it may be advisable
to partially restrict the lower orifice with gravel to increase residence time while still allowing
dewatering of the pond. A shut-off valve may be added to the control structure to allow complete
retention of stormwater in emergency situations. In this case, add an emergency overflow weir.
A skimmer may be used for the sediment trap outlet if approved by the City.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 248
3.2.17.3 Design and Installation Specifications
See Figure II-3-31 and Figure II-3-32 for details.
If permanent runoff control facilities are part of the project, they should be used for sediment
retention.
• To determine the sediment trap geometry, first calculate the design surface area
(SA) of the trap, measured at the invert of the weir. Use the following equation:
SA = FS(Q2/Vs)
Where:
SA = Design surface area, in square feet, of the sediment trap measured at the
invert of the weir.
Q2 = Design inflow, in cubic feet per second, based on the peak discharge from the
developed 2-year runoff event from the contributing drainage area as
computed in the hydrologic analysis. The 10-year peak flow shall be used if
the project size, expected timing and duration of construction, or downstream
conditions warrant a higher level of protection. If no hydrologic analysis is
required, the Rational Method may be used.
Alternatively, Q2 = Design inflow (cfs) based on the 2-year, 1-hour flowrate
predicted by WWHM for the developed (unmitigated site) multiplied by 1.3.
Use the 10-year peak flow if the project size, expected timing and duration of
construction, or downstream conditions warrant a higher level of protection.
Q10 is the 10-year, 1-hour flowrate predicted by WWHM multiplied by 1.6.
Vs = The settling velocity of the soil particle of interest. The 0.02 millimeter
(medium silt) particle with an assumed density of 2.65 grams per cubic
centimeter has been selected as the particle of interest and has a settling
velocity (Vs) of 0.00096 feet per second.
FS = A safety factor of 2 to account for non-ideal settling.
Therefore, the equation for computing surface area becomes:
SA = 2 x Q2/0.00096 or
= 2080 (Q2)
NOTE: Even if permanent facilities are used, they must still have a surface area that is at least as
large as that derived from the above formula. If they do not, the pond must be enlarged.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 249
• Smaller sites may use the minimum pond sizes in Table II-3-12 instead of providing
calculations.
Table II-3-12. Sediment Trap Sizing
Contributing Area (Acres) Required Surface Area
of Pond (sq. ft.)
1/8 acre or less 130
¼ acre or less 260
½ acre or less 520
¾ acre or less 780
1 acre or less 1040
• To aid in determining sediment depth, all sediment traps shall have a staff gauge
with a prominent mark 1-foot above the bottom of the trap.
• Sediment traps may not be feasible on utility projects due to the limited work space
or short-term nature of the work. Portable tanks may be used in place of sediment
traps for utility projects.
• The basic geometry of the pond can now be determined using the following design
criteria:
o Required surface area SA (from the equation above) at top of riser.
o Minimum 3.5-foot depth from top of riser to bottom of pond.
o Maximum 3H:1V interior side slopes and maximum 2H:1V exterior slopes.
The interior slopes can be increased to a maximum of 2H:1V if fencing is
provided at or above the maximum water surface.
o One foot of freeboard between the top of the riser and the crest of the
emergency spillway.
o Flat bottom.
o Minimum 1-foot deep spillway.
o Length-to-width ratio between 3:1 and 6:1.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 250
3.2.17.4 Maintenance Standards
• Remove sediment from the trap when it reaches 1-foot in depth.
• Repair any damage to the pond embankments or slopes.
Figure II-3-31. Cross-Section of a Sediment Trap
Figure II-3-32. Sediment Trap Outlet
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 251
3.2.18 BMP C241: Temporary Sediment Pond
3.2.18.1 Purpose
Sediment ponds remove sediment from runoff originating from disturbed areas of the site. Sediment
ponds are typically designed to remove sediment no smaller than medium silt (0.02 mm).
Consequently, they usually reduce turbidity only slightly.
3.2.18.2 Conditions of Use
Prior to leaving a construction site, stormwater runoff must pass through a sediment pond or other
appropriate sediment removal best management practice.
Use a sediment pond where the contributing drainage area is 3 acres or more. Ponds must be used
in conjunction with erosion control practices to reduce the amount of sediment flowing into the basin.
3.2.18.3 Design and Installation Specifications
Only install sediment basins on sites where failure of the structure would not result in loss of life,
damage to homes or buildings, or interruption of use or service of public roads or utilities. Also,
sediment traps and ponds are attractive to children and can be very dangerous. Compliance with
local ordinances regarding health and safety must be addressed. If fencing of the pond is required,
show the type of fence and its location on the ESC plan.
• Structures having a maximum storage capacity at the top of the dam of 10 acre-feet
(435,600 cubic feet) or more are subject to the Washington Dam Safety Regulations
(Chapter 173-175 WAC).
• See Figure II-3-33, Figure II-3-34 and Figure II-3-35 for details.
• If permanent detention facilities are part of the project, they may be used for
sediment retention. The surface area requirements of the sediment basin must be
met. This may require enlarging the permanent basin to comply with the surface area
requirements. If a permanent control structure is used, it may be advisable to
partially restrict the lower orifice with gravel to increase residence time while still
allowing dewatering of the basin.
• Use of infiltration facilities for sedimentation basins during construction tends to clog
the soils and reduce their capacity to infiltrate. If infiltration facilities are to be used,
the sides and bottom of the facility must only be rough excavated to a minimum of
2 feet above final grade. Final grading of the infiltration facility shall occur only when
all contributing drainage areas are fully stabilized. The infiltration pretreatment facility
should be fully constructed and used with the sedimentation basin to help prevent
clogging.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 252
Determining Pond Geometry
• Determine the required surface area at the top of the riser pipe with the equation:
SA = 2 x Q2/0.00096 or
SA = 2080 (Q2)
Where:
SA = Design surface area, in square feet, of the sediment trap measured at the
invert of the weir.
Q2 = Design inflow, in cubic feet per second, based on the peak discharge from the
developed 2-year runoff event from the contributing drainage area as
computed in the hydrologic analysis. The 10-year peak flow shall be used if
the project size, expected timing and duration of construction, or downstream
conditions warrant a higher level of protection. If no hydrologic analysis is
required, the Rational Method may be used.
Alternatively, Q2 = Design inflow (cfs) based on the 2-year, 15-minute flowrate
predicted by WWHM for the developed (unmitigated site). Use the 10-year
peak flow if the project size, expected timing and duration of construction, or
downstream conditions warrant a higher level of protection. Q10 is the 10-year,
15-minute flowrate predicted by WWHM. Note: WWHM 2 and 3 do not use 15
minute time steps for 2 or 10 year flow rates, they use 1-hour time steps. The
2-year flowrate predicted by WWHM 2 or 3 must be multiplied by 1.3 and the
10-year flowrate predicted by WWHM 2 or 3 must be multiplied by 1.6.
Currently it is unknown what time steps future versions of WWHM will use.
• See BMP C240 for more information on the derivation of the surface area
calculation.
• The basic geometry of the pond can now be determined using the following design
criteria:
o Required surface area SA (from the equation above) at top of riser.
o Minimum 3.5-foot depth from top of riser to bottom of pond.
o Maximum 3H:1V interior side slopes and maximum 2H:1V exterior slopes.
The interior slopes can be increased to a maximum of 2H:1V if fencing is
provided at or above the maximum water surface.
o One foot of freeboard between the top of the riser and the crest of the
emergency spillway.
o Flat bottom.
o Minimum 1-foot deep spillway.
o Length-to-width ratio between 3:1 and 6:1.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 253
Sizing of Discharge Mechanisms
The outlet for the basin consists of a combination of principal and emergency spillways. These outlets
must pass the peak runoff expected from the contributing drainage area for a 100-year storm. If, due
to site conditions and basin geometry, a separate emergency spillway is not feasible, the principal
spillway must pass the entire peak runoff expected from the 100-year storm. However, an attempt to
provide a separate emergency spillway should always be made. The runoff calculations shall be
based on the site conditions during construction. The flow through the dewatering orifice cannot be
utilized when calculating the 100-year storm elevation because of its potential to become clogged;
therefore, available spillway storage must begin at the principal spillway riser crest.
The principal spillway designed by the procedures contained in this standard will result in some
reduction in the peak rate of runoff. However, the riser outlet design will not adequately control the
basin discharge to the predevelopment discharge limitations as stated in Minimum Requirement #7:
Flow Control. However, if the basin for a permanent stormwater detention pond is used for a
temporary sedimentation basin, the control structure for the permanent pond can be used to maintain
predevelopment discharge limitations. The size of the basin, the expected life of the construction
project, the anticipated downstream effects, and the anticipated weather conditions during
construction should be considered to determine the need of additional discharge control. See Figure
II-3-36 for riser inflow curves.
Principal Spillway: Determine the required diameter for the principal spillway (riser pipe). The
diameter shall be the minimum necessary to pass the pre-developed 10-year peak flow (Q10). Use
Figure II-3-36 to determine this diameter (h = 1-foot).
NOTE: A permanent control structure may be used instead of a temporary riser.
Emergency Overflow Spillway: Determine the required size and design of the emergency overflow
spillway for the developed 100-year peak flow using the method contained in Volume III.
Alternatively, the 100-year peak flow as determined by WWHM multiplied by 1.6 can be used to size
the emergency overflow.
Dewatering Orifice: Determine the size of the dewatering orifice(s) (minimum 1-inch diameter) using
a modified version of the discharge equation for a vertical orifice and a basic equation for the area of
a circular orifice. Determine the required area of the orifice with the following equation:
5.0
5.0
3600x6.0
)2(
Tg
hAAs
o =
Where:
Ao = orifice area (square feet)
As = pond surface area (square feet)
h = head of water above orifice (height of riser in feet)
T = dewatering time (24 hours)
g = acceleration of gravity (32.2 feet per second squared)
D = orifice diameter (inches)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 254
Convert the required surface area to the required diameter D of the orifice:
o
o AADx54.13x24==
The vertical, perforated tubing connected to the dewatering orifice must be at least 2 inches larger in
diameter than the orifice to improve flow characteristics. The size and number of perforations in the
tubing shall be large enough so the tubing does not restrict flow. The orifice shall control the flow rate.
Additional Design Specifications
The pond shall be divided into two roughly equal volume cells by a permeable divider that will
reduce turbulence while allowing movement of water between cells. The divider shall be at least one-
half the height of the riser and a minimum of one foot below the top of the riser. Wire-backed, 2- to 3-
foot high, extra strength filter fabric supported by treated 4"x4"s can be used as a divider. If the pond
is more than 6 feet deep, a different mechanism must be proposed. A riprap embankment is one
acceptable method of separation for deeper ponds. Other designs that satisfy the intent of this
provision are allowed as long as the divider is permeable, structurally sound, and designed to prevent
erosion under or around the barrier.
To aid in determining sediment depth, prominently mark one-foot intervals on the riser.
If an embankment height of more than 6 feet is proposed, the pond must comply with the criteria
contained in Volume III regarding dam safety for detention BMPs.
The most common structural failure of sedimentation basins is caused by piping. Piping refers to two
phenomena: (1) water seeping through fine-grained soil, eroding the soil grain by grain and forming
pipes or tunnels and (2) water under pressure flowing upward through a granular soil with a head of
sufficient magnitude to cause soil grains to lose contact and capability for support.
The most critical construction sequences to prevent piping will be:
• Tight connections between the riser and barrel and other pipe connections.
• Adequate anchoring of the riser.
• Proper soil compaction of the embankment and riser footing.
• Proper construction of anti-seep devices.
3.2.18.4 Maintenance Standards
• Remove sediment from the pond when it reaches 1–foot in depth.
• Repair any damage to the pond embankments or slopes.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 255
Figure II-3-33. Sediment Pond
Figure II-3-34. Sediment Pond Cross Section
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 256
Figure II-3-35. Sediment Pond Riser Detail
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 257
Figure II-3-36. Riser Inflow Curves
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 258
3.2.19 BMP C250: Construction Stormwater Chemical Treatment
3.2.19.1 Purpose
This BMP applies when using stormwater chemicals in batch treatment or flow-through treatment.
Turbidity is difficult to control once fine particles are suspended in stormwater runoff from a
construction site. Sedimentation ponds are effective at removing larger particulate matter by gravity
settling, but are ineffective at removing smaller particulates such as clay and fine silt. Traditional
erosion and sediment control BMPs may not be adequate to ensure compliance with the water
quality standards for turbidity in the receiving water.
3.2.19.2 Conditions of Use
Formal written approval from Ecology and the City is required for the use of chemical
treatment regardless of site size. When approved, include the chemical treatment system in
the Stormwater Pollution Prevention Plan (SWPPP).
3.2.19.3 Design and Installation Specifications
See Appendix B for background information on chemical treatment.
Criteria for Chemical Treatment Product Use
Chemically treated stormwater discharged from construction sites must be nontoxic to aquatic
organisms. The Chemical Technology Assessment Protocol (CTAPE) must be used to evaluate
chemicals proposed for stormwater treatment. Only chemicals approved by Ecology under the
CTAPE may be used for stormwater treatment. The approved chemicals, their allowable
application techniques (batch treatment or flow-through treatment), allowable application rates, and
conditions of use can be found at the Department of Ecology Emerging Technologies website:
http://www.ecy.wa.gov/programs/wq/stormwater/newtech/index.html
Treatment System Design Considerations
The design and operation of a chemical treatment system should take into consideration the factors
that determine optimum, cost-effective performance. It is important to recognize the following:
• Only Ecology approved chemicals may be used and must follow approved dose
rates.
• The pH of the stormwater must be in the proper range for the polymers to be
effective, which is typically 6.5 to 8.5.
• The coagulant must be mixed rapidly into the water to ensure proper dispersion.
• A flocculation step is important to increase the rate of settling, to produce the lowest
turbidity, and to keep the dosage rate as low as possible.
• Too little energy input into the water during the flocculation phase results in flow that
are too small and/or insufficiently dense. Too much energy can rapidly destroy floc
as it is formed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 259
• Care must be taken in the design of the withdrawal system to minimize outflow
velocities and to prevent floc discharge. Discharge from a batch treatment system
should be directed through a physical filter such as a vegetated swale that would
catch any unintended floc discharge. Currently, flow-through systems always
discharge through the chemically enhanced sand filtration system.
• System discharge rates must take into account downstream conveyance integrity.
Polymer Batch Treatment Process Description
A batch chemical treatment system consists of the stormwater collection system (either temporary
diversion or the permanent site drainage system), an untreated stormwater storage pond, pumps, a
chemical feed system, treatment cells, and interconnecting piping.
The batch treatment system shall use a minimum of two lined treatment cells in addition to the
untreated stormwater storage pond. Multiple treatment cells allow for clarification of treated water
while other cells are being filled or emptied. Treatment cells may be ponds or tanks. Ponds with
constructed earthen embankments greater than six feet high require special engineering analyses.
Stormwater is collected at interception point(s) on the site and is diverted by gravity or by pumping to
an untreated stormwater storage pond or other untreated stormwater holding area. The stormwater is
stored until treatment occurs. It is important that the holding pond be large enough to provide
adequate storage.
The first step in the treatment sequence is to check the pH of the stormwater in the untreated
stormwater storage pond. The pH is adjusted by the application of carbon dioxide or a base until the
stormwater in the storage pond is within the desired pH range, 6.5 to 8.5. When used, carbon dioxide
is added immediately downstream of the transfer pump. Typically sodium bicarbonate (baking soda)
is used as a base, although other bases may be used. When needed, base is added directly to the
untreated stormwater storage pond. The stormwater is recirculated with the treatment pump to
provide mixing in the storage pond. Initial pH adjustments should be based on daily bench tests.
Further, pH adjustments can be made at any point in the process.
Once the stormwater is within the desired pH range (dependant on polymer being used), the
stormwater is pumped from the untreated stormwater storage pond to a treatment cell as polymer is
added. The polymer is added upstream of the pump to facilitate rapid mixing.
After polymer addition, the water is kept in a lined treatment cell for clarification of the sediment-floc.
In a batch mode process, clarification typically takes from 30 minutes to several hours. Prior to
discharge samples are withdrawn for analysis of pH and turbidity. If both are acceptable, the treated
water is discharged.
Several configurations have been developed to withdraw treated water from the treatment cell. The
original configuration is a device that withdraws the treated water from just beneath the water surface
using a float with adjustable struts that prevent the float from settling on the cell bottom (Figure II-
3-37). This reduces the possibility of picking up sediment-floc from the bottom of the pond. The struts
are usually set at a minimum clearance of about 12 inches; that is, the float will come within 12
inches of the bottom of the cell. Other systems have used vertical guides or cables which constrain
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 260
the float, allowing it to drift up and down with the water level. More recent designs have an H-shaped
array of pipes, set on the horizontal.
Figure II-3-37. Floating Platform with Struts
This scheme provides for withdrawal from four points rather than one. This configuration reduces the
likelihood of sucking settled solids from the bottom. It also reduces the tendency for a vortex to form.
Inlet differs, a long floating or fixed pipe with many small holes in it, are also an option.
Safety is a primary concern. Design should consider the hazards associated with operations, such as
sampling. Facilities should be designed to reduce slip hazards and drowning. Tanks and ponds
should have life rings, ladder, or steps extending from the bottom to the top.
Polymer Flow-Through Treatment Process Description
At a minimum, a flow-through chemical treatment system consists of the stormwater collection
system (either temporary diversion or the permanent site drainage system), an untreated stormwater
storage pond, and the chemically enhanced sand filtration system.
Stormwater is collected at interception point(s) on the site and is diverted by gravity or by pumping to
an untreated stormwater storage pond or other untreated stormwater holding area. The stormwater is
stored until treatment occurs. It is important that the holding pond be large enough to provide
adequate storage.
Stormwater is then pumped from the untreated stormwater storage pond to the chemically enhanced
sand filtration system where polymer is added. Adjustments to pH may be necessary before chemical
addition. The sand filtration system continually monitors the stormwater for turbidity and pH. If the
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 261
discharge water is ever out of an acceptable range for turbidity or pH, the water is recycled to the
untreated stormwater pond where it can be retreated.
Equipment
For batch treatment and flow-through treatment, the following equipment should be located in a
lockable shed:
• The chemical injector
• Secondary non-corrosive containment for acid, caustic, buffering compound, and
treatment chemical
• Emergency shower and eyewash
• Monitoring equipment
System Sizing
Certain sites are required to implement flow control for the developed sites. These sites must also
control stormwater release rates during construction. Generally, these are sites that discharge
stormwater directly or indirectly, through a conveyance system, into a freshwater. System sizing is
dependent on flow control requirements.
Sizing Criteria for Batch Treatment Systems for Flow Control Exempt Water Bodies
• The total volume of the untreated stormwater storage pond and treatment ponds or
tanks must be large enough to treat the volume of stormwater that is produced during
multiple day storm events. At a minimum, size the untreated storage pond to hold
1.5 times the runoff volume of the 10-year, 24-hour storm event. Provide bypass
around the chemical treatment system to accommodate extreme storm events.
Calculate runoff volumes using the methods in Volume III, Chapter 3. Use worst-case
land cover conditions (i.e., producing the most runoff) for analyses (in most cases, this
would be the land cover conditions just prior to final landscaping).
• Primary settling should be encouraged in the untreated stormwater storage pond. A
forebay with access for maintenance is beneficial.
• There are two opposing considerations in sizing the treatment cells. A larger cell is
able to treat a larger volume of water each time a batch is processed. However, the
larger the cell the longer the time is required to empty the cell. A larger cell may also
be less effective at flocculation and therefore require a longer settling time. The
simplest approach to sizing the treatment cell is to multiply the allowable discharge
flowrate times the desired drawdown time. A 4-hour drawdown time allow one batch
per cell per 8-hour work period, given 1 hour of flocculation followed by 2 hours of
settling.
• If the discharge is directly to a lake, flow control exempt receiving water, or to an
infiltration system, there is no discharge flow limit.
• Ponds sized for flow control water bodies must at a minimum meet the sizing criteria
for flow control exempt waters.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 262
Sizing Criteria for Flow-Through Treatment Systems for Flow Control Exempt Water Bodies:
• Sites that must implement flow control for the developed site condition must also
control stormwater release rates during construction. Construction site stormwater
discharges shall not exceed the discharge durations of the predeveloped condition for
the range of predeveloped discharge rates from ½ of the 2-year flow through the
10-year flow as predicted by WWHM. The predeveloped condition to be matched shall
be the land cover condition immediately prior to the development project. This
restriction on release rates can affect the size of the storage pond and treatment cells.
• The following is how WWHM can be used to determine the release rates from the
chemical treatment systems:
1. Determine the predeveloped flow durations to be matched by entering the land use
area under the “Predeveloped” scenario in WWHM. The default flow range is from ½
of the 2-year flow through the 10-year flow.
2. Enter the post developed land use area in the “Developed Unmitigated” scenario in
WWHM.
3. Copy the land use information for the “Developed Unmitigated” to “Developed
Mitigated” scenario.
4. While in the “Developed Mitigated” scenario, add a pond element under the basin
element containing the post-developed land use areas. This pond element represents
information on the available untreated stormwater storage and discharge from the
chemical treatment system. In cases where the discharge from the chemical
treatment is controlled by a pump, a stage/storage/discharge (SSD) table
representing the pond must be generated outside WWHM and imported into WWHM.
WWHM can route the runoff from the post-developed condition through this SSD
table (the pond) and determine compliance with the flow duration standard. This
would be an iterative design procedure where if the initial SSD table proved to be
inadequate, the designer would have to modify the SSD table outside WWHM and
reimport in WWHM and route the runoff through it again. The iteration will continue
until a pond that complies with the flow duration standard is correctly sized.
Notes on SSD table characteristics:
• The pump discharge rate would likely be initially set at just below ½ of the 2-year flow
from the pre-developed condition. As runoff coming into the untreated stormwater
storage pond increases and the available untreated stormwater storage volume gets
used up, it would be necessary to increase the pump discharge rate above ½ of the
2-year. The increase(s) above ½ of the 2-year must be such that they provide some
relief to the untreated stormwater storage needs but at the same time will not cause
violations of the flow duration standard at the higher flows. The final design SSD table
will identify the appropriate pumping rates and the corresponding stage and storages.
• When building such a flow control system, the design must ensure that any automatic
adjustments to the pumping rates will be as a result of the changes to the available
storage in accordance with the final design SSD table.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 263
• It should be noted that the above procedures would be used to meet the flow control
requirements. The chemical treatment system must be able to meet the runoff
treatment requirements. It is likely that the discharge flowrate of ½ of the 2-year or
more may exceed the treatment capacity of the system. If that is the case, the
untreated stormwater discharge rate(s) (i.e., influent to the treatment system) must be
reduced to allow proper treatment. Any reduction in the flows will likely result in the
need for a larger untreated stormwater storage volume.
• If the discharge is to a municipal storm drainage system, the allowable discharge rate
may be limited by the capacity of the public system. It may be necessary to clean the
municipal storm drainage system prior to the start of the discharge to prevent scouring
solids from the drainage system. If the municipal storm drainage system discharges to
a water body that is not flow control exempt, the project site is subject to flow control
requirements.
• If system design does not allow you to discharge at the slower rates as described
above and if the site had a retention or detention pond that will serve the planned
development, the discharge from the treatment system may be directed to the
permanent retention/detention pond to comply with the flow control requirement. In this
case, the untreated stormwater storage pond and treatment system will be sized
according to the sizing criteria for flow-through system for flow control exempt water
bodies described earlier except all discharge (water passing through the treatment
system and stormwater bypassing the treatment system) will be directed into the
permanent retention/detention pond. If site constraints make locating the untreated
stormwater storage pond difficult, the permanent retention/detention pond may be
divided to serve as the untreated stormwater storage pond and the post-treatment flow
control pond. A berm or barrier must be used in this case so the untreated water does
not mix with the treated water. Both untreated stormwater storage requirements, and
adequate post-treatment flow control must be achieved. The post-treatment flow
control pond’s revised dimensions must be entered into the WWHM and the WWHM
must be run to confirm compliance with the flow control requirements.
3.2.19.4 Monitoring
Conduct the following monitoring. Record test results on a daily log kept on site. Additional testing
may be required by the NPDES permit based on site conditions.
Operational Monitoring:
• Total volume treated and discharged
• Flow must be continuously monitored and recorded at not greater than 15-minute
intervals
• Type and amount of chemical used for pH adjustment, if any
• Quantity of chemical used for treatment
• Settling time
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 264
Compliance Monitoring
• Influent and effluent pH and turbidity must be continuously monitored and recorded
at not greater than 15-minute intervals.
• pH and turbidity of the receiving water
Biomonitoring
• Treated stormwater must be non-toxic to aquatic organisms. Treated stormwater must
be tested for aquatic toxicity or residual chemical content. Frequency of biomonitoring
will be determined by Ecology.
• Residual chemical tests must be approved by Ecology prior to their use.
• If testing treated stormwater for aquatic toxicity, you must test for acute (lethal) toxicity.
Bioassays shall be conducted by a laboratory accredited by Ecology, unless otherwise
approved by Ecology. Acute toxicity tests shall be conducted per the CTAPE protocol.
Discharge Compliance
• Prior to discharge, treated stormwater must be sampled and tested for
compliance with pH and turbidity limits. These limits may be established by the
Construction Stormwater General Permit, or a site-specific discharge permit. Sampling
and testing for other pollutants may also be necessary at some sites. pH must be
within the range of 6.5 to 8.5 standard units and not cause a change in the pH of the
receiving water of more than 0.2 standard units.
• Treated stormwater samples and measurements shall be taken from the discharge
pipe or another location representative of the nature of the treated stormwater
discharge. Samples used for determining compliance with the water quality standards
in the receiving water shall not be taken from the treatment pond prior to decanting.
Compliance with the water quality standards is determined in the receiving water.
Operator Training
• Each contractor who intends to use chemical treatment shall be trained by an
experienced contractor on an active site.
Standard BMPs
• Surface stabilization BMPs should be implemented on site to prevent significant
erosion. All sites shall use a truck wheel wash to prevent tracking of sediment off site.
Sediment Removal and Disposal:
• Remove sediment from the storage or treatment cells as necessary. Typically,
sediment removal is required at least once during a wet season and at the
decommissioning of the cells. Sediment remaining in the cells between batches may
enhance the settling process and reduce the required chemical dosage.
• Sediment that is known to be non-toxic may be incorporated into the site away from
drainages.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 265
3.2.20 BMP C251: Construction Stormwater Filtration
3.2.20.1 Purpose
Filtration removes sediment from runoff originating from disturbed areas of the site.
3.2.20.2 Conditions of Use
Traditional BMPs used to control soil erosion and sediment loss from sites under development may
not be adequate to ensure compliance with the water quality standard for turbidity in the receiving
water. Filtration may be used in conjunction with gravity settling to remove sediment as small as fine
silt (0.5 m). The reduction in turbidity will be d ependent on the particle size distribution of the
sediment in the stormwater. In some circumstances, sedimentation and filtration may achieve
compliance with the water quality standard for turbidity.
The use of construction stormwater filtration does not require approval from Ecology as long as
treatment chemicals are not used. Filtration in conjunction with polymer treatment requires testing
under the Chemical Technology Assessment Protocol – Ecology (CTAPE) before it can be initiated.
Approval from the appropriate regional Ecology office must be obtained at each site where polymers
use is proposed prior to use. For more guidance on stormwater chemical treatment see BMP C250.
3.2.20.3 Background Information
Filtration with sand media has been used for over a century to treat water and wastewater. The use
of sand filtration for treatment of stormwater has developed recently, generally to treat runoff from
streets, parking lots, and residential areas. The application of filtration to construction stormwater is
currently under development.
3.2.20.4 Design and Installation Specifications
Two types of filtration systems may be applied to construction stormwater treatment: rapid and slow.
Rapid sand filters are the typical system used for water and wastewater treatment. They can achieve
relatively high hydraulic flow rates, on the order of 2 to 20 gpm/sf, because they have automatic
backwash systems to remove accumulated solids. In contrast, slow sand filters have very low
hydraulic rates, on the order of 0.02 gpm/sf, because they do not have backwash systems. To date,
slow sand filtration has generally been used to treat stormwater. Slow sand filtration is mechanically
simple in comparison to rapid sand filtration but requires a much larger filter area.
Filtration Equipment
Sand media filters are available with automatic backwashing features that can filter to 50 m particle
size. Screen or bag filters can filter down to 5 m . Fiber wound filters can remove particles down to
0.5 m. Filters should be sequenced from the larges t to the smallest pore opening. Sediment
removal efficiency will be related to particle size distribution in the stormwater.
Treatment Process Description
Stormwater is collected at interception point(s) on the site and is diverted to an untreated stormwater
sediment pond or tank for removal of large sediment and storage of the stormwater before it is
treated by the filtration system. The stormwater is pumped from the trap, pond, or tank through the
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 266
filtration system in a rapid sand filtration system. Slow sand filtration systems are designed as flow
through systems using gravity.
Sizing Criteria for Flow-Through Treatment Systems for Flow Control Exempt Water Bodies
When sizing storage ponds or tanks for flow-through systems for flow control exempt water bodies,
the treatment system capacity should be a factor. The untreated stormwater storage pond or tank
should be sized to hold 1.5 times the runoff volume of the 10-year, 24-hour storm event minus the
treatment system flowrate for an 8-hour period. For a chitosan-enhanced sand filtration system, the
treatment flowrate should be sized using a hydraulic loading rate between 6-8 gpm/ft². Other
hydraulic loading rates may be more appropriate for other systems. Bypass should be provided
around the chemical treatment system to accommodate extreme storms. Runoff volumes shall be
calculated using the methods presented in Volume III, Chapter 3. Worst-case conditions (i.e.,
producing the most runoff) should be used for analyses (most likely conditions present prior to final
landscaping).
Sizing Criteria for Flow Control Waters:
Sites that must implement flow control for the developed site condition must also control stormwater
release rates during construction. Construction site stormwater discharges shall not exceed the
discharge durations of the pre-developed condition for the range of pre-developed discharge rates
from ½ of the 2-year flow through the 10-year flow as predicted by WWHM. The pre-developed
condition to be matched shall be the land cover condition immediately prior to the development
project. This restriction on release rates will affect the size of the sediment pond, the filtration system,
and the flow rate through the filter system.
The following is how WWHM can be used to determine the release rates from the filtration systems:
1. Determine the pre-developed flow durations to be matched by entering the land use area
under the “Pre-developed” scenario in WWHM. The default flow range is from ½ of the 2-year
flow through the 10-year flow.
2. Enter the post developed land use area in the “Developed Unmitigated” scenario in WWHM.
3. Copy the land use information from the “Developed Unmitigated” to “Developed Mitigated”
scenario.
4. There are two possible ways to model stormwater filtration systems:
a. The stormwater filtration system uses a storage pond/tank and the discharge from
this pond/tank is pumped to one or more filters. In-line filtration chemicals would be
added to the flow right after the pond/tank and before the filter(s). Because the
discharge is pumped, WWHM cannot generate a stage/storage/discharge (SSD)
table for this system. This system is modeled the same way as described in BMP
C250 and is as follows:
While in the “Developed Mitigated” scenario, add a pond element under
the basin element containing the post-developed land use areas. This
pond element represents information on the available storage and
discharge from the filtration system. In cases where the discharge from
the filtration system is controlled by a pump, a stage/storage/discharge
(SSD) table representing the pond must be generated outside WWHM
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 267
and imported into WWHM. WWHM can route the runoff from the post-
developed condition through this SSD table (the pond) and determine
compliance with the flow duration standard. This would be an iterative
design procedure where if the initial SSD table proved to be out of
compliance, the designer would have to modify the SSD table outside
WWHM and re-import in WWHM and route the runoff through it again.
The iteration will continue until a pond that enables compliance with the
flow duration standard is designed.
Notes on SSD Table Characteristics
• The pump discharge rate would likely be initially set at just below ½ if the 2-year flow
from the pre-developed condition. As runoff coming to the storage pond increases
and the available storage volume gets used up, it would be necessary to increase the
pump discharge rate above ½ of the 2-year. The increase(s) above ½ of the 2-year
must be such that they provide some relief to the storage needs but at the same time
they will not cause violations of the flow duration standard at the higher flows. The
final design SSD table will identify the appropriate pumping rates and the
corresponding stage and storages.
• When building such a flow control system, the design must ensure that any automatic
adjustments to the pumping rates will be as a result of changes to the available
storage in accordance with the final design SSD table.
b. The stormwater filtration system uses a storage pond/tank and the discharge from
this pond/tank gravity flows to the filter. This is usually a slow sand filter system
and it is possible to model it in WWHM as a Filter element or as a combination of
Pond and Filter element placed in series. The stage/storage/discharge table(s)
may then be generated within WWHM as follows:
(i) While in the “Developed Mitigated” scenario, add a Filter element under the basin
element containing the post-developed land use areas. The length and width of
this filter element would have to be the same as the bottom length and width of
the upstream storage pond/tank.
(ii) In cases where the length and width of the filter is not the same as those for the
bottom of the upstream storage tank/pond, the treatment system may be
modeled as a Pond element followed by a Filter element. By having these two
elements, WWHM would then generate a SSD table for the storage pond which
then gravity flows to the Filter element. The Filter element downstream of the
storage pond would have a storage component through the media, and an
overflow component for when the filtration capacity is exceeded.
WWHM can route the runoff from the post-developed condition through the treatment
systems in 4b and determine compliance with the flow duration standard. This would be an
iterative design procedure where if the initial sizing estimates for the treatment system proved
to be inadequate, the designer would have to modify the system and route the runoff through
it again. The iteration would continue until compliance with the flow duration standard is
achieved.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 268
5. It should be noted that the above procedures would be used to meet the flow control
requirements. The filtration system must be able to meet the runoff treatment requirements. It
is likely that the discharge flow rate of ½ of the 2-year or more may exceed the treatment
capacity of the system. If that is the case, the discharge rate(s) must be reduced to allow
proper treatment. Any reduction in the flows would likely result in the need for a larger storage
volume.
If the system does not allow you to discharge at the slower rate as described above and if the
site has a retention or detention pond that will serve the planned development, the discharge
from the treatment system may be directed to the permanent retention/detention pond to
comply with the flow control requirements. In this case, the untreated stormwater storage
pond and treatment system will be sized according to the sizing criteria for flow-through
treatment systems for flow control exempt waterbodies except all discharges (water passing
through the treatment system and stormwater bypassing the treatment system) will be
directed into the permanent retention/detention pond. If site constraints make locating the
untreated stormwater storage pond difficult, the permanent retention/detention pond may be
divided to serve as the untreated stormwater discharge pond and the post-treatment flow
control pond. A berm or barrier must be used in this case so the untreated water does not mix
with the treated water. Both untreated stormwater storage requirements, and adequate post-
treatment flow control must be achieved. The post-treatment flow control pond’s revised
dimensions must be entered into the WWHM and the WWHM must be run to confirm
compliance with the flow control requirements.
3.2.20.5 Maintenance Standards
Rapid sand filters typically have automatic backwash systems that are triggered by a pre-set
pressure drop across the filter. If the backwash water volume is not large or substantially more turbid
than the stormwater stored in the holding pond or tank, backwash return to the pond or tank may be
appropriate. However, land application or another means of treatment and disposal may be
necessary.
• Clean and/or replace screen, bag, and fiber filters when they become clogged.
• Remove sediment from the storage and/or treatment ponds as necessary. Typically,
sediment removal is required once or twice during a wet season and at the
decommissioning of the ponds.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 269
3.2.21 BMP C252: High pH Neutralization using CO2
3.2.21.1 Description
When pH levels in stormwater rise above 8.5 it is necessary to lower the pH levels to the acceptable
range of 6.5 to 8.5, this process is called pH neutralization. pH neutralization involves the use of solid
or compressed carbon dioxide gas in water requiring neutralization. Neutralized stormwater may be
discharged to surface waters under the General Construction NPDES permit but neutralized process
wastewater must be managed to prevent discharge to surface waters. Process wastewater includes
wastewaters such as concrete truck wash-out, hydro-demolition, or saw-cutting slurry.
Reason for pH neutralization
A pH level range of 6.5 to 8.5 is typical for most natural watercourses, and this neutral pH is required
for the survival of aquatic organisms. Should the pH rise or drop out of this range, fish and other
aquatic organisms may become stressed and may die.
Calcium hardness can contribute to high pH values and cause toxicity that is associated with high pH
conditions. A high level of calcium hardness in waters of the state is not allowed.
The water quality standard for pH in Washington State is in the range of 6.5 to 8.5.
Groundwater standard for calcium and other dissolved solids in Washington State is less than 500
mg/l.
Causes of high pH
High pH at construction sites is most commonly caused by the contact of stormwater with poured or
recycled concrete, cement, mortars, and other Portland cement or lime-containing construction
materials. (See BMP C151: Concrete Handling for more information on concrete handling
procedures). The principal caustic agent in cement is calcium hydroxide (free lime).
Advantages of CO2 Sparging
• Rapidly neutralizes high pH water.
• Cost effective and safer to handle than acid compounds.
• CO2 is self-buffering. It is difficult to overdose and create harmfully low pH levels.
• Material is readily available.
The Chemical Process
When carbon dioxide (CO2) is added to water (H2O), carbonic acid (H2CO3) is formed which can
further dissociate into a proton (H+) and a bicarbonate anion (HCO3-) as shown below:
CO2 + H2O H2CO3 H+ + HCO3
-
The free proton is a weak acid that can lower the pH.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 270
Water temperature has an effect on the reaction as well. The colder the water temperature is the
slower the reaction occurs and the warmer the water temperature is the quicker the reaction occurs.
Most construction applications in Washington State have water temperatures in the 50°F or higher
range so the reaction is almost simultaneous.
3.2.21.2 Treatment Procedures
High pH water may be treated using continuous treatment, continuous discharge systems. These
manufactured systems continuously monitor influent and effluent pH to ensure that pH values are
within an acceptable range before being discharged. All systems must have fail safe automatic shut
off switches in the event that pH is not within the acceptable discharge range. Only trained operators
may operate manufactured systems. System manufacturers often provide trained operators or
training on their devices.
The following procedure may be used when not using a continuous discharge system:
• Prior to treatment, the appropriate jurisdiction should be notified in accordance with the
regulations set by the jurisdiction.
• Every effort should be made to isolate the potential high pH water in order to treat it
separately from other stormwater on-site.
• Water should be stored in an acceptable storage facility, detention pond, or
containment cell prior to treatment.
• Transfer water to be treated to the treatment structure. Ensure that treatment structure
size is sufficient to hold the amount of water that is to be treated. Do not fill tank
completely, allow at least 2 feet of freeboard.
• The operator samples the water for pH and notes the clarity of the water. As a rule of
thumb, less CO2 is necessary for clearer water. This information should be recorded.
• In the pH adjustment structure, add CO2 until the pH falls in the range of 6.9-7.1.
Remember that pH water quality standards apply so adjusting pH to within 0.2 pH units
of receiving water (background pH) is recommended. It is unlikely that pH can be
adjusted to within 0.2 pH units using dry ice. Compressed carbon dioxide gas should
be introduced to the water using a carbon dioxide diffuser located near the bottom of
the tank, this will allow carbon dioxide to bubble up through the water and diffuse more
evenly.
• Slowly release the water to discharge making sure water does not get stirred up in the
process. Release about 80% of the water from the structure leaving any sludge
behind.
• Discharge treated water through a pond or drainage system.
• Excess sludge needs to be disposed of properly as concrete waste. If several batches
of water are undergoing pH treatment, sludge can be left in treatment structure for the
next batch treatment. Dispose of sludge when it fills 50% of tank volume.
Sites that must implement flow control for the developed site must also control stormwater release
rates during construction. All treated stormwater must go through a flow control facility before being
released to surface waters which require flow control.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 271
3.2.21.3 Safety and Materials Handling
• All equipment should be handled in accordance with OSHA rules and regulations.
• Follow manufacturer guidelines for materials handling.
3.2.21.4 Operator Records
Each operator should provide:
• A diagram of the monitoring and treatment equipment
• A description of the pumping rates and capacity the treatment equipment is capable
of treating.
Each operator should keep a written record of the following:
• Client name and phone number
• Date of treatment
• Weather conditions
• Project name and location
• Volume of water treated
• pH of untreated water
• Amount of CO2 needed to adjust water to a pH range of 6.9-7.1
• pH of treated water
• Discharge point location and description
A copy of this record should be given to the client/contractor who should retain the record for three
years.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standards and Specifications for BMPs Volume II
Chapter 3 272
3.2.22 BMP C253: pH Control for High pH Water
3.2.22.1 Description
When pH levels in stormwater rise above 8.5 it is necessary to lower the pH levels to the acceptable
range of 6.5 to 8.5, this process is called pH neutralization. Stormwater with pH levels exceeding
water quality standards may be treated by infiltration, dispersion in vegetation or compost, pumping
to a sanitary sewer, disposal at a permitted concrete batch plant with pH neutralization capabilities, or
carbon dioxide sparging. BMP C252 provides guidance for carbon dioxide sparging.
Reason for pH neutralization
A pH level between 6.5 and 8.5 is typical for most natural watercourses, and this pH range is required
for the survival of aquatic organisms. Should the pH rise or drop out of this range, fish and other
aquatic organisms may become stressed and may die.
Causes of high pH
High pH levels at construction sites are most commonly caused by the contact of stormwater with
poured or recycled concrete, cement, mortars, and other Portland cement or lime-containing
construction materials. (See BMP C151: Concrete Handling for more information on concrete
handling procedures). The principal caustic agent in cement is calcium hydroxide (free lime).
3.2.22.2 Disposal Methods
Infiltration
• Infiltration is only allowed if soil type allows all water to infiltrate (no surface runoff) without
causing or contributing to a violation of surface or groundwater quality standards.
• Infiltration techniques should be consistent with Volume V, Chapter 5.
Dispersion
• Use BMP L614 Full Dispersion
Sanitary Sewer Disposal
• Local sewer authority approval is required prior to disposal via the sanitary sewer.
Concrete Batch Plant Disposal
• Only permitted facilities may accept high pH water.
• Facility should be contacted before treatment to ensure they can accept the high pH water.
Stormwater Discharge
Any pH treatment options that generate treated water that must be discharged off site are subject to
flow control requirements. Sites that must implement flow control for the developed site must also
control stormwater release rates during construction. All treated stormwater must go through a flow
control facility before being released to surface waters which require flow control.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Standard Notes for Volume II
Erosion Control Plans Appendix A 273
Appendix A Standard Notes for Erosion Control Plans
Use the following standard notes on project Stormwater Pollution Prevention Plan (SWPPP) and
associated drawings. Other mandatory notes for construction plans may be applicable. Plans shall
identify the name and phone number of the person or firm responsible for the preparation and
maintenance of the erosion control plan.
Standard Notes
Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of
permanent road or drainage design (e.g. size and location of roads, pipes, restrictors, channels,
retention facilities, utilities, etc.).
The implementation of these ESC plans and the construction, maintenance, replacement, and
upgrading of these ESC facilities is the responsibility of the applicant/contractor until all construction
is completed and approved and vegetation/landscaping is established.
The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior to
construction. During the construction period, no disturbance beyond the flagged clearing limits shall
be permitted. The flagging shall be maintained by the applicant/contractor for the duration of
construction.
The ESC facilities shown on this plan must be constructed in conjunction with all clearing and grading
activities, and in such a manner as to ensure that sediment and sediment laden water do not enter
the drainage system or roadways, or violate applicable water standards.
The ESC facilities shown on this plan are the minimum requirements for anticipated site conditions.
During the construction period, these ESC facilities shall be upgraded as needed for unexpected
storm events and to ensure that sediment and sediment-laden water do not leave the site.
The ESC facilities shall be inspected daily by the applicant/contractor and maintained as necessary
to ensure their continued functioning.
The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a month or
within the 48 hours following a major storm event.
At no time shall more than one foot of sediment be allowed to accumulate within a catch basin
sediment trap. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning
operation shall not flush sediment-laden water into the downstream system.
Stabilized construction entrances shall be installed at the beginning of construction and maintained
for the duration of the project. Additional measures may be required to ensure that all paved areas
are kept clean for the duration of the project.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Background Information Volume II
on Chemical Treatment Appendix B 274
Appendix B Background Information on Chemical
Treatment
Coagulation and flocculation have been used for over a century to treat water. It is used less
frequently for the treatment of wastewater. The use of coagulation and flocculation for treating
stormwater is a very recent application. Experience with the treatment of water and wastewater has
resulted in a basic understanding of the process, in particular factors that affect performance. This
experience can provide insights as to how to most effectively design and operate similar systems in
the treatment of stormwater.
Fine particles suspended in water give it a milky appearance, measured as turbidity. Their small size,
often much less than 1 m in diameter, give them a very large surface area relative to their volume.
These fine particles typically carry a negative surface charge. Largely because of these two factors,
small size and negative charge, these particles tend to stay in suspension for extended periods of
time. Thus, removal is not practical by gravity settling. These are called stable suspensions.
Polymers, as well as inorganic chemicals such as alum, speed the process of clarification. The added
chemical destabilizes the suspension and causes the smaller particles to agglomerate. The process
consists of three steps: coagulation, flocculation, and settling or clarification. Each step is explained
below, as well as the factors that affect the efficiency of the process.
Coagulation: Coagulation is the first step. It is the process by which negative charges on the fine
particles that prevent their agglomeration are disrupted. Chemical addition is one method of
destabilizing the suspension, and polymers are one class of chemicals that are generally effective.
Chemicals that are used for this purpose are called coagulants. Coagulation is complete when the
suspension is destabilized by the neutralization of the negative charges. Coagulants perform best
when they are thoroughly and evenly dispersed under relatively intense mixing. This rapid mixing
involves adding the coagulant in a manner that promotes rapid dispersion, followed by a short time
period for destabilization of the particle suspension. The particles are still very small and are not
readily separated by clarification until flocculation occurs.
Flocculation: Flocculation is the process by which fine particles that have been destabilized bind
together to form larger particles that settle rapidly. Flocculation begins naturally following coagulation,
but is enhanced by gentle mixing of the destabilized suspension. Gentle mixing helps to bring
particles in contact with one another such that they bind and continually grow to form "flocs." As the
size of the flocs increases, they become heavier and tend to settle more rapidly.
Clarification: The final step is the settling of the particles. Particle density, size, and shape are
important during settling. Dense, compact flocs settle more readily than less dense, fluffy flocs.
Because of this, flocculation to form dense, compact flocs is particularly important during water
treatment. Water temperature is important during settling. Both the density and viscosity of water are
affected by temperature; these in turn affect settling. Cold temperatures increase viscosity and
density, thus slowing down the rate at which the particles settle.
The conditions under which clarification is achieved can affect performance. Currents can affect
settling. Currents can be produced by wind, by differences between the temperature of the incoming
water and the water in the clarifier, and by flow conditions near the inlets and outlets.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Background Information Volume II
on Chemical Treatment Appendix B 275
Quiescent water, such as that which occurs during batch clarification, provides a good environment
for effective performance, as many of these factors become less important in comparison to typical
sedimentation basins. One source of currents that is likely important in batch systems is movement of
the water leaving the clarifier unit. Given that flocs are relatively small and light, the exit velocity of the
water must be as low as possible. Sediment on the bottom of the basin can be resuspended and
removed by fairly modest velocities.
Coagulants: Polymers are large organic molecules that are made up of subunits linked together in a
chain-like structure. Attached to these chain-like structures are other groups that carry positive or
negative charges, or have no charge. Polymers that carry groups with positive charges are called
cationic, those with negative charges are called anionic, and those with no charge (neutral) are called
nonionic.
Cationic polymers can be used as coagulants to destabilize negatively charged turbidity particles
present in natural waters, wastewater, and stormwater. Aluminum sulfate (alum) can also be used as
this chemical becomes positively charged when dispersed in water. In practice, the only way to
determine whether a polymer is effective for a specific application is to perform preliminary or on-site
testing.
Polymers are available as powders, concentrated liquids, and emulsions (which appear as milky
liquids). The latter are petroleum based, which are not allowed for construction stormwater treatment.
Polymer effectiveness can degrade with time and from other influences. Thus, manufacturers'
recommendations for storage should be followed. Manufacturers’ recommendations usually do not
provide assurance of water quality protection or safety to aquatic organisms. Consideration of water
quality protection is necessary in the selection and use of all polymers.
Application Considerations: Application of coagulants at the appropriate concentration or dosage
rate for optimum turbidity removal is important for management of chemical cost, for effective
performance, and to avoid aquatic toxicity. The optimum dose in a given application depends on
several site-specific features. Turbidity of untreated water can be important with turbidities greater
than 5,000 NTU. The surface charge of particles to be removed is also important. Environmental
factors that can influence dosage rate are water temperature, pH, and the presence of constituents
that consume or otherwise affect polymer effectiveness. Laboratory experiments indicate that mixing
previously settled sediment (floc sludge) with untreated stormwater significantly improves clarification,
therefore reducing the effective dosage rate. Preparation of working solutions and thorough dispersal
of polymers in water to be treated is also important to establish the appropriate dosage rate.
For a given water sample, there is generally an optimum dosage rate that yields the lowest residual
turbidity after settling. When dosage rates below this optimum value (underdosing) are applied, there
is an insufficient quantity of coagulant to react with, and therefore destabilize, all of the turbidity
present. The result is residual turbidity (after flocculation and settling) that is higher than with the
optimum dose. Overdosing, application of dosage rates greater than the optimum value, can also
negatively impact performance. Again, the result is higher residual turbidity than that with the
optimum dose.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Background Information Volume II
on Chemical Treatment Appendix B 276
Mixing in Coagulation/Flocculation: The G-value, or just "G", is often used as a measure of the
mixing intensity applied during coagulation and flocculation. The symbol G stands for “velocity
gradient”, which is related in part to the degree of turbulence generated during mixing. High G-values
mean high turbulence, and vice versa. High G-values provide the best conditions for coagulant
addition. With high Gs, turbulence is high and coagulants are rapidly dispersed to their appropriate
concentrations for effective destabilization of particle suspensions.
Low G-values provide the best conditions for flocculation. Here, the goal is to promote formation of
dense, compact flocs that will settle readily. Low Gs provide low turbulence to promote particle
collisions so that flocs can form. Low Gs generate sufficient turbulence such that collisions are
effective in floc formation, but do not break up flocs that have already formed.
Design engineers wishing to review more detailed presentations on this subject are referred to the
following textbooks:
• Fair, G., J. Geyer and D. Okun, Water and Wastewater Engineering, Wiley and
Sons, NY, 1968.
• American Water Works Association, Water Quality and Treatment, McGraw-Hill, NY,
1990.
• Weber, W.J., Physiochemical Processes for Water Quality Control, Wiley and Sons,
NY, 1972.
Adjustment of pH and Alkalinity: The pH must be in the proper range for the polymers to be
effective, which is 6.5 to 8.5 for Calgon CatFloc 2953, the most commonly used polymer. As
polymers tend to lower the pH, it is important that the stormwater have sufficient buffering capacity.
Buffering capacity is a function of alkalinity. Without sufficient alkalinity, the application of the polymer
may lower the pH to below 6.5. A pH below 6.5 not only reduces the effectiveness of the polymer, it
may create a toxic condition for aquatic organisms. Stormwater may not be discharged without
readjustment of the pH to above 6.5. The target pH should be within 0.2 standard units of the
receiving water pH.
Experience gained at several projects in the City of Redmond has shown that the alkalinity needs to
be at least 50 mg/L to prevent a drop in pH to below 6.5 when the polymer is added.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 277
Appendix C Construction SWPPP Short Form
Projects falling within the thresholds listed below may use this short form instead of preparing a
professionally-designed Construction Stormwater Pollution Prevention Plan (SWPPP). If your project
meets the following thresholds and includes or may impact a critical area, please contact the City to
determine if the SWPPP short form may be used.
The thresholds for using this form are projects that propose to:
• Add or replace between 2,000 and 5,000 square feet of impervious surface.
OR
• Clear or disturb between 7,000 square feet and 1 acre of land.
OR
• Grade/fill less than 500 cubic yards.
If project quantities exceed either of these thresholds, prepare a formal Construction SWPPP as
described in Chapter 2 of this volume.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 278
City of Auburn
Construction Stormwater Pollution Prevention Plan
Short Form
Project Name: __ ______
Address:
Contact/Owner: Phone:
Erosion Control Supervisor:
Phone: Cell: Pager:
Emergency (After hour) contact: Phone:
Permit No:
Parcel No.:
Required Submittals
1. Project Narrative
The Construction Stormwater Pollution Prevention Plan (SWPPP) Short-Form Narrative must be
completed as part of this packet. Any information described, as part of the narrative, should be shown
on the site plan.
NOTE: From October 1 thru April 30, clearing, grading, and other soil disturbing activities shall only
be permitted by special authorization from the City of Auburn.
A. Project Description (Check all that apply)
New Structure Building Addition Grading/Excavation Paving
Utilities Other: ______________________________________________
1. Total project area__________ (square feet)
2. Total proposed impervious area__________(square feet)
3. Total existing impervious area _________(square feet)
4. Total proposed area to be disturbed __________(square feet)
5. Total volumes of proposed cuts/fill_________(cubic yards)
Additional Project Information:
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 279
B. Existing Site Conditions (Check all that apply)
• Describe the existing vegetation on the site. (Check all that apply)
Forest Pasture/prairie grass Pavement Landscaping Brush
Trees Other_____________________________________________________
• Describe how surface water (stormwater) drainage flows across/from the site. (Check all
that apply)
Sheet Flow Gutter Catch Basin Ditch/Swale Storm sewer
Stream Other __________________________________________________
• Describe any unusual site condition(s) or other features of note.
Steep Grades Large depression Underground tanks Springs
Easements Existing Structures Existing Utilities
Other___________________________________________________________
C. Adjacent Areas (Check all that apply)
1. Check any adjacent areas that may be affected by site disturbance and describe in fully
describe in item 2 below:
Streams* Lakes* Wetlands* Steep Slopes*
Residential Areas Roads Ditches, pipes, culverts
Other __________________________________________________________
* If site is on or adjacent to a critical area, the City of Auburn may require additional information, engineering, and
other permits to be submitted with this short-form.
2. Describe how and where surface water enters the site from upstream properties:
3. Describe the downstream drainage path leading from the site to the receiving body of
water. (Minimum distance of ¼-mile (1320 feet)) {E.g. water flows from site, into curb-
line to catch basin at intersection of X and Y streets. A 10-inch pipe system conveys
water another 1000 feet to a ravine/wetland.}
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 280
D. Soils (Check all that apply)
The intent of this section is to identify when additional soils information may be required for applicants
using this short form. There are other site-specific issues that may necessitate a soils investigation or
more extensive erosion control practices. The City will determine these situations on a case-by-case
basis as part of their review.
1. Does the project propose infiltration? Infiltration systems require prior City approval.
Yes No Groundwater Protection Zone 2
2. Does the project propose construction near or on steep slopes?
Yes No
If infiltration is proposed for the site or steep slopes have been identified, the City will require soils
information as part of the project design. The applicant must contact a soil professional or civil
engineer specializing in soil analysis to perform an in-depth soils investigation. If yes is checked
for either question, the City may not permit the use of this short-form.
E. Construction Sequencing/Phasing
1. Construction sequence: The standard construction sequence is as follows:
• Mark clearing/grading limits.
• Call Building Inspector to inspect clearing/grading limits.
• Install initial erosion control practices (construction entrance, silt fence, catch basin
inserts).
• Contact Building Inspector to inspect initial erosion control practices.
• Clear, grade, and fill site as outlined in the site plan while implementing and
maintaining temporary erosion and sediment control practices at the same time.
• Install permanent erosion protection (impervious surface, landscaping, etc.).
• Contact Building Inspector for approval of permanent erosion protection and site
grades.
• Remove erosion control methods as permitted by the Building Inspector and repair
permanent erosion protection as necessary.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 281
• Monitor and maintain permanent erosion protection until fully established.
List any changes from the standard construction sequence outlined above.
2. Construction phasing: If construction is going to occur in separate phases, describe:
F. Construction Schedule
1. Provide a proposed construction schedule (dates construction starts and ends, and
dates for any construction phasing).
Start Date: End Date:
Interim Phasing Dates:
Wet Season Construction Activities: Wet season occurs from October 1 to April 30. Describe
construction activities that will occur during this time period.
NOTE: Additional erosion control methods may be required during periods of increased surface
water runoff.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 282
2. Site Plan (See attached example)
A site plan, to scale, shall be included with this checklist that shows the following items:
___ a. Address, Parcel Number, Permit Number and Street names
___ b. North Arrow
___ c. Indicate boundaries of existing vegetation (e.g. tree lines, grassy areas, pasture
areas, fields, etc.)
___ d. Identify any on-site or adjacent critical areas and associated buffers (e.g. wetlands,
steep slopes, streams, etc.).
___ e. Identify any FEMA base flood boundaries and Shoreline Management boundaries.
___ f. Show existing and proposed contours.
___ g. Delineate areas that are to be cleared and graded.
___ h. Show all cut and fill slopes, indicating top and bottom of slope catch lines
___ i. Show locations where upstream runon enters the site and locations where runoff
leaves the site.
___ j. Indicate existing surface water flow direction(s).
___ k. Label final grade contours and indicate proposed surface water flow direction and
surface water conveyance systems (e.g. pipes, catch basins, ditches, etc.).
___ l. Show grades, dimensions, and direction of flow in all (existing and proposed) ditches,
swales, culverts, and pipes.
__ m. Indicate locations and outlets of any dewatering systems (usually to sediment trap).
___ n. Identify and locate all erosion control techniques to be used during and after
construction.
See attached: Guidelines for Erosion Control Practices and sample Site Plan.
Onsite field verification of actual conditions is required.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 283
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-38. Sample Erosion and Sediment Control Plan
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 284
Guidelines for Erosion Control Practices
As required by Ecology, this SWPPP must contain the 12 required elements. Check off each
element as it is addressed in the SWPPP Short Form and/or on your site plan.
___ 1. Mark Clearing Limits (orange construction fence, staking with ribbon).
___ 2. Establish Construction Access (gravel entrance, tire wash area).
___ 3. Control Flow Rates (using pipe, drainage swales, berms).
___ 4. Install Sediment Controls (silt fence, sediment traps).
___ 5. Stabilize Soils (mulch, hydroseed, straw).
___ 6. Protect Slopes (divert water from top of slope, cover with plastic or erosion
control blanket).
___ 7. Protect Drain Inlets (catch basin inserts).
___ 8. Stabilize Channels and Outlets (cover with grass, riprap).
___ 9. Control Pollutants (maintain equipment to prevent leaks).
___ 10. Control Dewatering (pump to sediment trap).
___ 11. Maintain BMPs (weekly maintenance/replacement, preparation for storm events).
___ 12. Manage the Project (establish construction schedule, phasing, contact numbers).
Several common erosion control techniques are explained and described in this section. Standard
details for installation of these methods are included in this document. The applicant does not need to
reproduce these drawings, but must indicate where each BMP will be used on a site plan and
indicate which detail will be used. An example site plan and symbols list is provided to assist the
applicant in preparation of their own site plan.
Only those erosion and sediment control techniques most pertinent to small construction sites are
included here. More detailed information on construction BMPs can be found in Volume II of the City
of Auburn Surface Water Management Manual. The BMP numbers referenced are BMPs located in
the City of Auburn SWMM.
For phased construction plans, clearly indicate erosion control methods to be used for each phase of
construction.
Mark Clearing Limits
All construction projects must clearly mark any clearing limits, sensitive areas and their buffers, and
any trees that will be preserved prior to beginning any land disturbing activities, including clearing and
grading. Clearly mark limits both in the field and on the plans. Plastic, metals, or stake wires may be
used to mark the clearing limits. Do not staple or wire fences to trees. See Figure II-3-1 for Stake and
Wire fencing
Applicable BMPs include:
• BMP C101: Preserving Natural Vegetation
• BMP C102: Buffer Zones
• BMP C103: High Visibility Plastic and Wire Fence
• BMP C104: Stake and Wire Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 285
Construction Entrance
All construction projects subject to vehicular traffic shall provide a means of preventing vehicle
“tracking” of soil from the site onto City streets. At a minimum, there shall be a rock pad construction
entrance at every construction access point. Note: The applicant should consider placing the
entrance in the area for future driveway(s), as the rock can be used for driveway base material. The
entrance(s) shall be inspected weekly and if excessive sediment is found, more rock shall be added
to ensure proper functioning.
If sediment is tracked off site, it shall be swept or shoveled from the paved surface on a daily basis.
Washing of the streets to remove the sediment is not permitted because wash water can transport
sediments to streams and other water courses via the City storm drainage system.
The entrance must be identified on the site plan and must conform to Figure II-C-39.
Applicable BMPs include:
• BMP C105: Stabilized Construction Entrance
• BMP C106: Wheel Wash
• BMP C107: Construction Road/Parking Area Stabilization
Sediment Barriers (Figure II-C-41 through Figure II-C-45)
Sediment barriers should be used downslope of disturbed areas. Sediment barriers are intended to
create a barrier to slow the “sheet” flow of stormwater and allow the sediment to settle out behind the
barrier. Do not use sediment barriers in streams, channels, ditches or around inlets/outlets of
culverts. Sediment barriers selected shall be identified on the site plan and must conform to those
shown in Figure II-C-41 through Figure II-C-45.
1. Silt fence
A silt fence is a temporary sediment barrier consisting of filter fabric, attached to supporting posts and
entrenched into the soil. See Figure II-C-41.
2. Berm Barriers
A continuous berm is a temporary diversion dike or sediment barrier. It may be constructed with:
• Soil, sand, or aggregate encased within a geosynthetic fabric
(see Figure II-C-42 and Figure II-C-43).
• Straw wattles (see Figure II-C-44).
• Sand bags (see Figure II-C-45).
Applicable BMPs include:
• BMP C231: Brush Barrier
• BMP C232: Gravel Filter Berm
• BMP C233: Silt Fence
• BMP C234: Vegetated Strip
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 286
• BMP C235: Straw Wattles
Catch Basin Protection (Figure II-C-46 and Figure II-C-47)
To prevent sediment from entering drainage systems prior to site stabilization, install catch basin
protection within onsite and nearby downstream catch basins. Figure II-C-46 and Figure II-C-47 are
acceptable methods of catch basin protection.
NOTE: Only Figure II-C-46 is approved for use in City of Auburn right of way.
Applicable BMPs include:
• BMP C220: Storm Drain Inlet Protection
Water Runoff Containment/Control
As an alternative to or in conjunction with sediment barriers, a combination of drainage swales and
possibly a sediment trap may be used to control runoff and trap sediment before it leaves the
construction site.
1. Sediment traps (Figure II-C-48 and Figure II-C-49)
Sediment traps are small temporary ponds (typically less than 3 feet deep) used to trap sediment
suspended in site runoff before it leaves a construction site. As concentrated surface water pools
within the pond, sediment is allowed to settle out of the water. Typically, a sediment trap will not be
required for small sites as long as concentrated stormwater runoff (swales or ditches) does not occur.
Use Table II-C-13 for sizing your sediment trap.
Table II-C-13. Sediment Trap Sizing
Contributing Area (Acres) Required Surface Area of Pond
(sq. ft.)
1/8 acre or less 130
¼ acre or less 260
½ acre or less 520
¾ acre or less 780
1 acre or less 1040
If expected time of construction or downstream conditions warrant more protection, see BMP C240
for sizing information.
NOTE: If dewatering or significant stormwater runoff is expected, a sediment trap should be used to
settle out solids before discharging to the City system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 287
2. Drainage Swales (Figure II-C-50)
Drainage swales are temporary ditches (minimum slope of 0.5% and a maximum of 10%) used to
convey concentrated stormwater flows away from construction activities into a temporary sediment
trap. Drainage swales carrying concentrated flows must discharge into a sediment trap or pond.
Swales should be stabilized with erosion protection (see below). Note: Swales should be completely
stabilized before directing concentrated flows or they themselves will erode.
Applicable BMPs include:
• BMP C240: Sediment Trap
• BMP C201: Grass-Lined Channels
• BMP C202: Channel Lining
• BMP C207: Check Dams
Soil Erosion Protection
Soil erosion protection is applied over the soil surface to reduce erosion from rainfall and wind. It can
also be used to aid the establishment of vegetation. Between October 1st and April 30th, no soils shall
remain exposed for more than 2 days unless they are being actively worked. From April 1st to
September 30th, no soils shall remains exposed for more than 7 days unless they are being actively
worked. See Table II-C-14, Table II-C-15 and Figure II-C-51 through Figure II-C-54.
1. Mulches/Seeding/Hydroseeding (Table II-C-14 and Table II-C-15)
Mulching is the application of a protective layer of straw or other suitable material to the soil surface.
Mulch can be applied to any site where soil has been disturbed and the protective vegetation has
been removed. Materials that may be used for mulching include:
• Straw or hay
• Compost material
• Wood or bark chips
• Hydraulically applied grass seed (Hydroseed)
• Bonded Fiber Matrix
Applicable BMPs include:
• BMP C121: Mulching
• BMP C120: Temporary and Permanent Seeding
• BMP C124: Sodding
• BMP C125: Compost
• BMP C126: Topsoiling
• BMP C130: Surface Roughening
• BMP C140: Dust Control
NOTE: The applicant may wish to mix in grass seed with the above practices to further aid in soil
stabilization. Please refer to Table II-C-14 and Table II-C-15.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 288
2. Erosion Control Blankets/ Mats (Figure II-C-51)
Erosion control blankets are suited for post-construction site stabilization, but may be used for
temporary stabilization of highly erosive soils. Erosion control blankets are suitable for steep slopes,
stream banks, and areas where vegetation will be slow to establish. These blankets are typically
made from straw, coconut fiber, excelsior, or synthetic material that is enveloped in plastic,
biodegradable netting, jute, polypropylene, or nylon.
Applicable BMPs include:
• BMP C122: Nets and Blankets
3. Gravel/Riprap (Figure II-C-52 and Figure II-C-53)
Gravel and Riprap are used to protect hillsides, drainage channels, stream banks, and pipe outlets
from erosion due to surface water flow.
4. Plastic Sheeting (Figure II-C-54)
Plastic sheeting is a temporary method of erosion control. Plastic covering provides immediate, short-
term erosion protection to slopes, soil stockpiles, and other disturbed areas. Unlike the other erosion
protection techniques mentioned above, plastic sheeting shall be removed prior to applying
permanent erosion protection.
Applicable BMPs include:
• BMP C123: Plastic Covering
Protect Slopes
Design, construct and phase projects in a manner that will minimize erosion. Protect slopes by
diverting water at the top of the slope. Reduce slope velocities by minimizing the continuous length of
slope. This can be accomplished by terracing and roughening slope sides. Seeding and establishing
vegetation on slopes will help protect slopes as well.
Applicable BMPs include:
• BMP C120: Temporary and Permanent Seeding
• BMP C130: Surface Roughening
• BMP C131: Gradient Terraces
• BMP C200: Interceptor Dike and Swale
• BMP C204: Pipe Slope Drains
Control Pollutants Other Than Sediment
All pollutants must be disposed of in a manner that does not cause contamination of surface waters.
Do not maintain or repair any heavy equipment or vehicles onsite. Clean any spills immediately.
Handle concrete and concrete waste appropriately.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 289
Applicable BMPs include:
• BMP C150: Materials on Hand
• BMP C151: Concrete Handling
• BMP C152: Sawcutting and Surfacing Pollution Prevention
• BMP C153: Materials Delivery, Storage and Containment
• BMP C154: Concrete Washout Area
Control Dewatering
All discharges to the City sewer system require City and King County approval. This approval
process may be initiated by contacting the City. The City will coordinate the request for a letter of
authorization from the King County Wastewater Treatment Division.
Any dewatering water must be discharged through a stabilized channel to a sediment pond.
Maintain BMPs
Maintain and repair temporary erosion and sediment control BMPs as needed. Inspect all BMPs at
least weekly and after every storm event. Remove all temporary erosion and sediment control BMPs
within 30 days after final site stabilization.
Table II-C-14. Temporary Erosion Control Seed Mix
% Weight % Purity % Germination
Chewings or annual bluegrass
Festuca rubra var. commutate or Poa anna 40 98 90
Perennial rye
Lolium perenne 50 98 90
Redtop or colonial bentgrass
Agrostis alba or Agrostis tenuis 5 92 85
White Dutch clover
Trifolium repens 5 98 90
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 290
Table II-C-15. Mulch Standards and Guidelines
Mulch
Material
Quality
Standards
Application
Rates
Remarks
Straw Air-dried; free from
undesirable seed and
coarse material.
3” thick; 5 bales
per 1000 sf or 2
to 3 tons per
acre.
Cost-effective protection when applied with adequate thickness.
Hand-application generally requires greater thickness than blown
straw. The thickness of straw may be reduced by half when used
in conjunction with seeding. In windy areas, straw must be held in
place by crimping, using a tackifier, or covering with netting.
Blown straw always has to be held in place with a tackifier as
even light winds will blow it away. Straw, however, has several
deficiencies that should be considered when selecting mulch
materials. If often introduces and/or encourages the propagation
of weed species and it has no significant long-term benefits.
Straw should be used only if mulches with long-term benefits are
unavailable locally. It should also not be used within the ordinary
high-water elevation of surface waters (due to flotation).
Hydro-
mulch
No growth inhibiting
factors.
Approx. 25-30
lbs per 1000 sf
or 1500-2000
lbs per acre.
Shall be applied with hydromulcher. Shall not be used without
seed and tackifier unless the application rate is at least doubled.
Fivers longer than about ¾ - 1 inch clog hydromulch equipment.
Fibers should be kept to less than ¾ inch.
Composted
Mulch and
Compost
No visible water or
dust during handling.
Must be purchased
from supplier with a
Solid Waste Handling
permit (unless
exempt)
3” thick, min.;
approx. 100
tons per acre
(approx. 800
lbs. per yard).
More effective control can be obtained by increasing thickness to
3”. Excellent mulch for protecting final grades until landscaping
because it can be directly seeded or tilled into soil as an
amendment. Composted mulch has a coarser size gradation
than compost. It is more stable and practical to use in wet areas
and during rainy weather conditions.
Chipped
Site
Vegetation
Average size shall be
several inches.
Gradations from fine to
6-inches in length for
texture, variation, and
interlocking properties.
3” minimum
thickness
This is a cost-effective way to dispose of debris from clearing and
grubbing, and it eliminates the problems associated with burning.
Generally, it should not be used on slopes above approx. 10%
because of its tendency to be transported by runoff. It is not
recommended within 200 feet of surface waters. If seeding is
expected shortly after mulch, the decomposition of the chipped
vegetation may tie up nutrients important to grass establishment.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 291
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-39. Construction Entrance
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 292
Figure II-C-40. Stake and Wire Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 293
Figure II-C-41. Sediment Barrier – Silt Fence
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 294
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-42. Sediment Barrier – Triangular Sediment Filter Dikes
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 295
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-43. Sediment Barrier – Geosynthetic Dike
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 296
Figure II-C-44. Sediment (Berm) Barrier – Straw Wattle Rolls
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 297
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-45. Sediment (Berm) Barrier – Sandbag Berm
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 298
Figure II-C-46. Catch Basin Protection – Bag Filter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 299
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-47. Catch Basin Protection – Inlet Gravel and Filter Fabric
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 300
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-48. Water Runoff Containment/Control – Sediment Trap Cross-Section
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 301
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-49. Water Runoff Containment/Control – Sediment Trap Outlet
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 302
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-50. Water Runoff Containment/Control – Drainage Swale Cross-Sections
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 303
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-51. Soil Erosion Protection – Erosion Blankets and Turf Reinforcement Mats
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 304
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-52. Soil Erosion Protection – Rip Rap Protection
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 305
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-53. Soil Erosion Protection – Pipe Slope Drains
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Construction SWPPP Short Form Volume II
Appendix C 306
Nov 4, 2002-c:\projects\storm\small site erosion control.dwg
Figure II-C-54. Soil Erosion Protection – Tarp Covering
Volume III
i Table of Contents
Volume III – Surface Water
Quantity Control and Conveyance
Table of Contents
Purpose of this Volume...................................................................................................................307
Content and Organization of this Volume.......................................................................................307
Chapter 1 Hydrologic Analysis......................................................................................308
1.1 Minimum Computational Standards......................................................................................308
1.2 Western Washington Hydrology Model.................................................................................308
1.3 Single-Event Hydrograph Method.........................................................................................309
1.3.1 Design Storm...................................................................................................................309
1.3.2 Curve Number.................................................................................................................309
1.4 Closed Depression Analysis..................................................................................................310
Chapter 2 Flow Control Design......................................................................................312
2.1 Roof Downspout Controls......................................................................................................312
2.1.1 Selection of Roof Downspout Controls............................................................................312
2.1.1.1 Roof Downspout Controls in Potential Landslide Hazard Areas...........................313
2.1.2 Downspout Infiltration Systems.......................................................................................313
2.1.2.1 Application.............................................................................................................313
2.1.2.2 Flow Credit for Roof Downspout Infiltration..........................................................313
2.1.2.3 Procedure for Evaluating Feasibility......................................................................313
2.1.2.4 Design Criteria for Infiltration Trenches.................................................................314
2.1.3 Downspout Dispersion Systems......................................................................................319
2.1.3.1 Application.............................................................................................................319
2.1.3.2 Flow Credit for Roof Downspout Dispersion.........................................................319
2.1.3.3 General Design Criteria.........................................................................................319
2.1.4 Bioinfiltration “Rain Gardens”..........................................................................................321
2.1.5 Collect and Convey..........................................................................................................326
2.2 Infiltration Facilities for Stormwater Flow Control..................................................................327
2.2.1 Purpose............................................................................................................................327
2.2.2 Description.......................................................................................................................327
2.2.3 Application.......................................................................................................................327
2.2.4 Design Methodology........................................................................................................329
2.2.5 Simplified Approach.........................................................................................................329
2.2.6 Detailed Approach...........................................................................................................330
Volume III
ii Table of Contents
2.2.7 Site Characterization Criteria...........................................................................................334
2.2.7.1 Surface Features Characterization.......................................................................335
2.2.7.2 Subsurface Characterization.................................................................................335
2.2.7.3 Infiltration Rate Determination...............................................................................335
2.2.7.4 Soil Testing............................................................................................................336
2.2.7.5 Infiltration Receptor...............................................................................................337
2.2.8 Design Infiltration Rate Determination – Guidelines and Criteria....................................338
2.2.9 Three Methods for Determining Long-term Infiltration Rates for Sizing Infiltration
Facilities...........................................................................................................................339
2.2.10 Site Suitability Criteria (SSC)...........................................................................................343
2.2.10.1 SSC-1 Setback Criteria.........................................................................................344
2.2.10.2 SSC-2 Groundwater Protection Areas..................................................................344
2.2.10.3 SSC-3 High Vehicle Traffic Areas.........................................................................344
2.2.10.4 SSC-4 Drawdown Time.........................................................................................345
2.2.10.5 SSC-5 Depth to Bedrock, Water Table, or Impermeable Layer............................345
2.2.10.6 SSC-6 Seepage Analysis and Control..................................................................345
2.2.10.7 SSC-7 Cold Climate and Impact of Roadway Deicers..........................................345
2.2.10.8 SSC-8 Verification Testing of the Completed Facility...........................................345
2.2.11 Design Criteria for Infiltration Facilities............................................................................345
2.2.12 Construction Criteria........................................................................................................346
2.2.13 Maintenance Criteria........................................................................................................347
2.2.14 Verification of Performance.............................................................................................347
2.2.15 Infiltration Basins.............................................................................................................347
2.2.16 Infiltration Trenches.........................................................................................................349
2.2.16.1 Description:...........................................................................................................349
2.2.16.2 Design Criteria.......................................................................................................349
2.2.16.3 Construction Criteria..............................................................................................350
2.2.16.4 Maintenance Criteria.............................................................................................351
2.3 Detention Facilities................................................................................................................351
2.3.1 Detention Ponds..............................................................................................................351
2.3.1.1 Dam Safety for Detention BMPs...........................................................................351
2.3.1.2 Design Criteria.......................................................................................................352
2.3.1.3 Methods of Analysis..............................................................................................366
2.3.2 Detention Tanks...............................................................................................................367
2.3.2.1 Design Criteria.......................................................................................................370
2.3.3 Detention Vaults..............................................................................................................371
2.3.3.1 Design Criteria.......................................................................................................373
2.3.3.2 Methods of Analysis..............................................................................................375
2.3.4 Control Structures............................................................................................................375
2.3.4.1 Design Criteria.......................................................................................................375
2.3.4.2 Maintenance..........................................................................................................376
2.3.4.3 Methods of Analysis..............................................................................................377
2.3.5 Other Detention Options..................................................................................................386
Volume III
iii Table of Contents
Chapter 3 Conveyance System Design and Hydraulic Analysis.................................387
3.1 Conveyance System Analysis Requirements........................................................................387
3.1.1 On-site Analysis...............................................................................................................387
3.1.2 Offsite Analysis (1/4 mile Downstream Analysis)............................................................388
3.2 Design Event.........................................................................................................................388
3.2.1 Additional Design Criteria................................................................................................389
3.3 Methods of Analysis..............................................................................................................389
3.3.1 Rational Method...............................................................................................................390
3.3.1.1 Rational Method Equation.....................................................................................390
3.4 Pipes, Culverts and Open Channels.....................................................................................396
3.4.1 Pipe Systems...................................................................................................................396
3.4.1.1 Design Flows.........................................................................................................396
3.4.1.2 Conveyance Capacity...........................................................................................397
3.4.1.3 Backwater Analysis...............................................................................................402
3.4.1.4 Inlet Grate Capacity...............................................................................................406
3.4.1.5 Pipe Materials........................................................................................................406
3.4.1.6 Pipe Sizes.............................................................................................................406
3.4.1.7 Changes in Pipe Sizes..........................................................................................406
3.4.1.8 Pipe Alignment and Depth....................................................................................406
3.4.1.9 Pipe Slopes and Velocities....................................................................................407
3.4.1.10 Pipes on Steep Slopes..........................................................................................407
3.4.1.11 Structures..............................................................................................................408
3.4.1.12 Pipe Clearances....................................................................................................410
3.4.1.13 Pipe Cover.............................................................................................................411
3.4.1.14 System Connections.............................................................................................411
3.4.1.15 Debris Barriers......................................................................................................412
3.4.2 Culverts............................................................................................................................413
3.4.2.1 Design Event.........................................................................................................413
3.4.2.2 Design Flows.........................................................................................................413
3.4.2.3 Headwater.............................................................................................................413
3.4.2.4 Conveyance Capacity...........................................................................................413
3.4.2.5 Inlet Control Analysis.............................................................................................413
3.4.2.6 Outlet Control Analysis..........................................................................................418
3.4.2.7 Inlets and Outlets..................................................................................................424
3.4.3 Open Channels................................................................................................................424
3.4.3.1 Natural Channels...................................................................................................424
3.4.3.2 Constructed Channels...........................................................................................424
3.4.3.3 Design Flows.........................................................................................................426
3.4.3.4 Conveyance Capacity...........................................................................................431
3.4.3.5 Manning’s Equation for Preliminary Sizing............................................................432
3.4.3.6 Direct Step Backwater Method..............................................................................432
3.4.3.7 Standard Step Backwater Method........................................................................436
3.4.3.8 Computer Applications..........................................................................................436
Volume III
iv Table of Contents
3.4.3.9 Riprap Design........................................................................................................436
3.5 Outfalls Systems....................................................................................................................440
3.5.1 Outfall Design Criteria......................................................................................................440
3.5.1.1 Energy dissipation.................................................................................................441
3.5.1.2 Flow dispersion.....................................................................................................441
3.5.2 Tightline Systems............................................................................................................448
3.5.3 Habitat Considerations....................................................................................................448
3.6 Pump Systems.......................................................................................................................448
3.6.1 Design Criteria.................................................................................................................449
3.6.2 Pump Requirements........................................................................................................449
3.6.3 Additional Requirements..................................................................................................449
3.6.4 Sump Pumps...................................................................................................................450
3.7 Easements and Access........................................................................................................450
3.7.1 Public Easements............................................................................................................450
3.7.2 Private Easements...........................................................................................................451
3.7.3 Maintenance Access........................................................................................................451
Appendix A Auburn Design Storm....................................................................................453
Appendix B Procedure for Conducting a Pilot Infiltration Test.......................................454
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Purpose Volume III
Content and Organization Introduction 307
Volume III:
Surface Water Quantity
Control and Conveyance
Purpose of this Volume
The purpose of this volume is to outline methods for calculating and designing methods to control the
quantity of surface water runoff at developed sites. Quantity controls and on-site management for
roof downspouts are described. Design criteria and methods of analysis for flow control BMPs are
presented. Conveyance system requirements and design methods are also presented
Content and Organization of this Volume
Volume III of this manual contains three chapters and two appendices.
Chapter 1 reviews methods of hydrologic analysis.
Chapter 2 describes flow control design.
Chapter 3 describes the requirements for analysis and design of surface water
conveyance systems.
Appendix A provides the Auburn Design Storm precipitation values.
Appendix B describes the procedure for a Pilot Infiltration Test.
Volume
III
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Hydrologic Analysis Volume III
Chapter 1 308
Chapter 1 Hydrologic Analysis
The purpose of this chapter is to define the minimum computational standards required, and outline
how these computational standards may be applied.
1.1 Minimum Computational Standards
The minimum computational standards depend on the type of information required and the size of
the drainage area to be analyzed, as follows:
The most current software version of the Department of Ecology’s Western
Washington Hydrology Model (WWHM) model shall be used. Alternative models for
sizing flow control and water quality facilities may be considered, provided they are
Washington State Department of Ecology equivalent, and approved by the City of
Auburn. Approval from the City shall be obtained prior to submittal of design
documents.
Model calibration shall be required for basins greater than 320 acres.
Exception: The Santa Barbara Urban Hydrograph method (SBUH) may be used to determine a
water quality design storm volume for wetpond treatment facilities only.
Table III-1-1 summarizes the circumstances under which different design methodologies apply.
Table III-1-1. BMP Designs in Western Washington
Method Treatment Flow Control
Standard Continuous Runoff
Model (WWHM or
approved equivalent)
Method applies to all
BMPs.
Method applies throughout
Auburn where flow control is
required.
Alternative SBUH Wetpool water quality
treatment facilities only.
Acceptable for City storm
drainage system capacity
problems.
1.2 Western Washington Hydrology Model
For most flow control design purposes, a continuous runoff model, such as the Western Washington
Hydrology Model (WWHM), must be used. Information on the WWHM is provided in the Stormwater
Management Manual for Western Washington (Washington State Department of Ecology, 2005).
The software can be downloaded at the following website:
http://www.ecy.wa.gov/programs/wq/stormwater/wwhmtraining/index.html
More WWHM information is available at http://www.clearcreeksolutions.com
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Hydrologic Analysis Volume III
Chapter 1 309
Note: Pre-developed conditions shall be modeled as a forested land cover with either outwash
(Hydrologic Soil Group A/ B) or till (Hydrologic Soil Group C/D) soils. Saturated soil conditions shall
only be considered when determining existing wetland hydrology.
1.3 Single-Event Hydrograph Method
Hydrograph analysis with a single event hydrograph method utilizes the standard plot of runoff flow
versus time for a given design storm, allowing the key characteristics of runoff such as peak, volume,
and phasing to be considered in the design of drainage facilities. Single event methods are only
acceptable for sizing wetpool treatment facilities or for determining pipe capacity.
All storm event hydrograph methods require input of parameters that describe physical drainage
basin characteristics. These parameters provide the basis from which the runoff hydrograph is
developed.
1.3.1 Design Storm
The total depth of rainfall for storms of 24-hour duration and 2, 5, 10, 25, 50, and 100-year recurrence
intervals are published by the National Oceanic and Atmospheric Administration (NOAA). The
information is presented in the form of “isopluvial” maps for each state. Isopluvial maps are maps
where the contours represent total inches of rainfall for a specific duration. Isopluvial maps for the 2,
5, 10, 25, 50, and 100-year recurrence interval and 24-hour duration storm events can be found in
the NOAA Atlas 2, “Precipitation - Frequency Atlas of the Western United States, Volume IX-
Washington.” Based on these isopluvials, the following design storms shall be used for the City of
Auburn:
6-month, 24-hour design storm: 1.44 inches
2-year, 24-hour design storm: 2.0 inches
10-year, 24-hour design storm: 3.0 inches
100-year, 24-hour design storm: 4.0 inches
1.3.2 Curve Number
Surface soils are classified by the National Resource Conservation Service into four hydrologic soil
groups based on the soil’s runoff potential: A, B, C, and D. Group A soils generally have the lowest
runoff potential while Group D soils have the highest. In Auburn the valley floor is mostly Group D
soils, which typically have very low infiltration rates and high runoff potential. The West Hill, Lea Hill,
and Lakeland Hills areas are predominately Group C soils, which have low infiltration rates and
moderate to high runoff potential. The southeast area, Bowman Creek area, and valley area located
between Highway 18 and the White River contain some Group A soils, which are characterized by
high infiltration rates and low runoff potential. Soils within the City limits shall be assumed to fall in the
Hydrologic Soils Groups as shown in figure 4-4 of the City of Auburn Comprehensive Drainage Plan
unless grain size distribution and/or permeability testing indicate otherwise. Refer to Section 2.2.7.4
for details on appropriate soil testing methods.
Table III-1-2 shows the curve numbers (CNs), by land use description, for the four hydrologic soil
groups. These numbers are for a 24-hour duration storm and the typical antecedent soil moisture
condition preceding 24-hour storms.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Hydrologic Analysis Volume III
Chapter 1 310
The following are important criteria/considerations for selection of CN values.
Many factors may affect the CN value for a given land use. For example, the movement of heavy
equipment over bare ground may compact the soil so that it has a lesser infiltration rate and greater
runoff potential than would be indicated by strict application of the CN value to developed site
conditions.
CN values can be area weighted when they apply to pervious areas of similar CNs (within 20 CN
points). However, high CN areas should not be combined with low CN areas. In this case, separate
estimates of S (potential maximum natural detention) and Qd (runoff depth) should be generated and
summed to obtain the cumulative runoff volume unless the low CN areas are less than 15 percent of
the sub-basin.
Separate CN values must be selected for the pervious and impervious areas of an urban basin or
sub-basin. For residential districts, the percent impervious area given in Table III-1-2 must be used to
compute the respective pervious and impervious areas. For proposed commercial areas, plats, etc.,
the percent impervious area must be computed from the site plan. For all other land uses, the
percent impervious area must be estimated from best available aerial topography and/or field
reconnaissance. The pervious area CN value must be a weighted average of all the pervious area
CNs within the sub-basin. The impervious area CN value shall be 98.
1.4 Closed Depression Analysis
The analysis of closed depressions requires careful assessment of the existing hydrologic
performance in order to evaluate the impacts of a proposed project. A calibrated continuous
simulation hydrologic model must be used for closed depression analysis and design of mitigation
facilities. The applicable requirements of this manual (see Minimum Requirement #7 and #8) and the
City’s Critical Areas Ordinance and Rules should be thoroughly reviewed prior to proceeding with the
analysis.
Closed depressions generally facilitate infiltration of runoff. If a closed depression is classified as a
wetland, then Minimum Requirement #8 for wetlands applies. If there is an outflow from the wetland
to a surface water (such as a creek), then the flow from the wetland must also meet Minimum
Requirement #7 for flow control. If a closed depression is not classified as a wetland, the ponding
area at the bottom of the closed depression should be modeled as an infiltration pond.
Guidance for modeling closed depressions and model calibration shall be provided by the
Department of Public Works.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Hydrologic Analysis Volume III
Chapter 1 311
Table III-1-2. Runoff Curve Numbers for Selected Agricultural, Suburban and Urban Areas
(Sources: TR 55, 1986, and Stormwater Management Manual, 1992. See Section 2.1.1 for explanation)
CNs for hydrologic soil group
Cover type and hydrologic condition. A B C D
Curve Numbers for Pre-Development Conditions
Pasture, grassland, or range-continuous forage for grazing:
Fair condition (ground cover 50% to 75% and not heavily grazed). 49 69 79 84
Good condition (ground cover >75% and lightly or only occasionally grazed) 39 61 74 80
Woods:
Fair (Woods are grazed but not burned, and some forest litter covers the soil). 36 60 73 79
Good (Woods are protected from grazing, and litter and brush adequately cover the soil). 30 55 70 77
Curve Numbers for Post-Development Conditions
Open space (lawns, parks, golf courses, cemeteries, landscaping, etc.)1
Fair condition (grass cover on 50% - 75% of the area). 77 85 90 92
Good condition (grass cover on >75% of the area) 68 80 86 90
Impervious areas:
Open water bodies: lakes, wetlands, ponds etc. 100 100 100 100
Paved parking lots, roofs2, driveways, etc. (excluding right-of-way) 98 98 98 98
Permeable Pavement (see Appendix C of 2005 Ecology Manual to decide which condition applies)
Landscaped area 77 85 90 92
50% landscaped area/50% impervious 87 91 94 96
100% impervious area 98 98 98 98
Paved 98 98 98 98
Gravel (including right-of-way) 76 85 89 91
Dirt (including right-of-way) 72 82 87 89
Pasture, grassland, or range-continuous forage for grazing:
Poor condition (ground cover <50% or heavily grazed with no mulch). 68 79 86 89
Fair condition (ground cover 50% to 75% and not heavily grazed). 49 69 79 84
Good condition (ground cover >75% and lightly or only occasionally grazed) 39 61 74 80
Woods:
Poor (Forest litter, small trees, brush are destroyed by heavy grazing or regular burning). 45 66 77 83
Fair (Woods are grazed but not burned, and some forest litter covers the soil). 36 60 73 79
Good (Woods are protected from grazing, and litter and brush adequately cover the soil). 30 55 70 77
Single family residential3: Should only be used for Average Percent
Dwelling Unit/Gross Acre subdivisions > 50 acres impervious area3,4
1.0 DU/GA 15 Separate curve number
1.5 DU/GA 20 shall be selected for
2.0 DU/GA 25 pervious & impervious
2.5 DU/GA 30 portions of the site or
3.0 DU/GA 34 basin
3.5 DU/GA 38
4.0 DU/GA 42
4.5 DU/GA 46
5.0 DU/GA 48
5.5 DU/GA 50
6.0 DU/GA 52
6.5 DU/GA 54
7.0 DU/GA 56
7.5 DU/GA 58
PUDs, condos, apartments, commercial %impervious Separate curve numbers shall
businesses, industrial areas & must be be selected for pervious and
& subdivisions < 50 acres computed impervious portions of the site
For a more detailed and complete description of land use curve numbers refer to chapter two (2) of the Soil Conservation Service’s
Technical Release No. 55, (210-VI-TR-55, Second Ed., June 1986).
1 Composite CNs may be computed for other combinations of open space cover type. 2Where roof runoff and driveway runoff are infiltrated or dispersed according to the requirements in Chapter 2, the average percent
impervious area may be adjusted in accordance with the procedure described under “Flow Credit for Roof Downspout Infiltration”
and “Flow Credit for Roof Downspout Dispersion” in Volume 6, Chapter 2. 3Assumes roof and driveway runoff is directed into street/storm system. 4All the remaining pervious area (lawn) is considered to be in good condition for these curve numbers.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 312
Chapter 2 Flow Control Design
2.1 Roof Downspout Controls
This section presents the criteria for design and implementation of roof downspout controls. Roof
downspout controls are simple pre-engineered designs for infiltrating and/or dispersing runoff from
roof areas for the purposes of increasing opportunities for groundwater recharge and reduction of
runoff volumes from new development or redevelopment.
For roof areas below 10,000 square feet, these designs may typically be implemented with a single
test pit, unless directed otherwise by the City. For designs other than those presented in Section 2.1,
the requirements of Section 2.2 shall apply.
Roof downspout controls are used in conjunction with, and in addition to, any additional flow control
facilities that may be necessary to mitigate stormwater impacts from the overall development.
Implementation of roof downspout controls may reduce the total effective impervious area and result
in less runoff from these surfaces. Flow credits for implementing infiltration and dispersion for controls
are available as follows:
• If all the roof runoff is infiltrated according to the requirements of this section, the roof
• area may be discounted from the total project area used for determining project
thresholds and sizing stormwater facilities.
• If roof runoff is dispersed according to the requirements of this section on lots greater
than 22,000 square feet and the vegetative flow path is 50 feet or longer through
undisturbed native landscape or lawn/landscape area that meets BMP L613, the roof
area may be modeled as grassed surface.
Additional information on flow credits is available in Volume VI, Chapter 2.
2.1.1 Selection of Roof Downspout Controls
Large lots in rural areas (5 acres or greater) typically have enough area to disperse or infiltrate roof
runoff. Lots created in urban areas will typically be smaller and have a limited amount of area
in which to infiltrate or disperse stormwater. Downspout infiltration may be used in those soils
that readily infiltrate (coarse sands and cobbles to medium sands). Dispersion BMPs may be used
for urban lots located in less permeable soils, where infiltration is not feasible. Where infiltration
and/or dispersion is not feasible because of very small lot size, or where there is a potential
for creating drainage problems on adjacent lots, downspouts shall be connected to the street
storm drain system, which directs the runoff to a regional facility or receiving water.
Where roof downspout controls are planned, the following methods should be considered in
descending order of preference:
• Rain gardens (Section 2.1.4)
• Downspout infiltration systems (Section 2.1.2)
• Downspout dispersion systems (Section 2.1.3)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 313
• Collect and convey to the City stormwater system – only allowed if it can be
demonstrated that infiltration and dispersion are not feasible.
2.1.1.1 Roof Downspout Controls in Potential Landslide Hazard Areas
If or where the City has identified “geologically hazardous areas” (WAC 365-195-410), lots
immediately adjacent to or within the hazard area shall collect roof runoff in a tightline system which
conveys the runoff to the City system or to the base of the slope and then into the City system.
Easements across adjacent properties may be necessary to convey drainage to the City system.
2.1.2 Downspout Infiltration Systems
Downspout infiltration systems are trenches designed for flow control and are intended only for use in
infiltrating runoff from roof downspout drains. They are not designed to infiltrate directly runoff from
pollutant-generating impervious surfaces. Volume V, Chapter 5 contains a discussion of infiltration
trenches for water quality treatment.
2.1.2.1 Application
Use downspout infiltration on all sites that meet feasibility and setback requirements.
2.1.2.2 Flow Credit for Roof Downspout Infiltration
If roof runoff is infiltrated according to the requirements of this section, the roof area may be
discounted from the project area used for determining project thresholds and sizing stormwater
facilities.
2.1.2.3 Procedure for Evaluating Feasibility
A soils report to determine if soils suitable for infiltration are present on the site shall be prepared by a
professional soil scientist certified by the Soil Science Society of America (or an equivalent national
program), a locally licensed onsite sewage designer, other suitably trained professional engineer,
geologist, hydrogeologist, or engineering geologist registered in the State of Washington, or persons
working under the supervision of one of the soils professional listed here.
NOTE: On sites where soils are insufficient for infiltration, a downspout dispersion system per
Section 2.1.3 may be feasible in lieu of infiltration.
1. Where downspout infiltration is being proposed, additional site-specific testing must be done.
For single lots, at least one soils log at the location of the infiltration system is required. It
must be a minimum of 4 feet deep (from proposed grade). Identify the SCS series of the soil
and the USDA textural class of the soil horizon through the depth of the log, and note any
evidence of high groundwater level, such as mottling.
2. If site-specific tests indicate less than 3 feet of permeable soil from the proposed final grade
to the seasonal high groundwater table, a downspout infiltration system is not feasible and a
downspout dispersion system per Section 2.1.3 may be feasible in lieu of infiltration.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 314
3. On lots or sites with more than 3 feet of permeable soil from the proposed final grade to the
seasonal high groundwater table, downspout infiltration is considered feasible if the soils are
outwash type soils and the infiltration trench can be designed to meet the minimum design
criteria specified below. Under no circumstances shall the seasonal high groundwater table
be less then 1 foot from the bottom of the infiltration trench.
2.1.2.4 Design Criteria for Infiltration Trenches
Figure III-2-1 shows a typical downspout infiltration trench system, and Figure III-2-2 presents an
alternative infiltration trench system for sites with coarse sand and cobble soils. These systems are
designed as specified below. Alternate trench lengths require modeling per Section 2.2.
General
1. The following minimum lengths (in linear feet [LF]) per 1,000 square feet of roof area based
on soil type may be used for sizing downspout infiltration trenches.
Coarse sands and cobbles 20 LF
Medium sand 30 LF
Fine sand, loamy sand 75 LF
Sandy loam 125 LF
Loam 190 LF
2. Maximum length of trench must not exceed 100 feet from the inlet sump.
3. Minimum spacing between trenches shall be 4 feet measured from the edge of trench.
4. Filter fabric must be placed over the drain rock as shown on Figure III-2-1 prior to backfilling.
5. Three feet of permeable soil, measured from the proposed final grade to the seasonal high
groundwater table is required.
6. A minimum of 1 foot of separation is required from the bottom of the infiltration trench to the
seasonal high groundwater table.
7. Infiltration trenches may be placed in fill material if the fill is placed and compacted under the
direct supervision of a geotechnical engineer or professional civil engineer with geotechnical
expertise, and if the measured infiltration rate is at least 8 inches per hour. Trench length in fill
must be 60 linear feet per 1,000 square feet of roof area. Infiltration rates can be tested using
the methods described in Section 2.2.7.3.
8. Infiltration trenches shall not be built on slopes steeper than 20 percent (5H:1V). A
geotechnical analysis and report shall be required on slopes over 15 percent or if located
within 200 feet of the top of steep slope (40% or greater) or landslide hazard area. More
stringent setbacks may be required as described in Auburn City Code.
9. Trenches may be located under pavement if a small yard drain or catch basin with grate
cover is placed at the end of the trench pipe such that overflow would occur out of the catch
basin at an elevation at least one foot below that of the pavement, and in a location which can
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 315
accommodate the overflow without creating a significant adverse impact to downhill
properties or drainage systems. This is intended to prevent saturation of the pavement in the
event of system failure.
Setbacks
The City requires specific setbacks for sites with steep slopes, landslide areas, open water features,
springs, wells, and septic tank drain fields. Adequate room for maintenance access and equipment
shall also be considered. Project proponents should consult Auburn City Code to determine all
applicable setback requirements. Where a conflict between setbacks occurs, the City shall require
compliance with the most stringent of the setback requirements from the various codes/regulations.
Required setbacks are as follows or as determined by a qualified geotechnical engineer:
• Minimum spacing between trenches shall be 4 feet measured from the edge of
trench.
• Stormwater infiltration facilities shall be set back at least 100 feet from drinking water
wells and springs used for public drinking water supplies. Stormwater infiltration
facilities shall be set back at least 10 feet from septic tanks and septic drainfields.
Additional setbacks from DOH publication 333-117 On-Site Sewage Systems,
Chapter 246-272A WAC may apply. Infiltration facilities upgradient of drinking water
supplies and within 1, 5, and 10-year time of travel zones must comply with Health
Department requirements (Washington Wellhead Protection Program, DOH,
Publication # 331-018).
• All infiltration systems shall be at least 10 feet from any structure. If necessary,
setbacks shall be increased from the minimum 10 feet in order to maintain a 1H:1V
side slope for future excavation and maintenance.
• All infiltration systems shall be placed at least 5 feet from any property line. If
necessary, setbacks shall be increased from the minimum 5 feet in order to maintain
a 1H:1V side slope for future excavation and maintenance.
• Infiltration systems shall be setback from sensitive areas, steep slopes, landslide
hazard areas, and erosion hazard areas as governed by Auburn City Code. Runoff
discharged near landslide hazard areas must be evaluated by a geotechnical
engineer or qualified geologist licensed in Washington State. The discharge point
shall not be placed on or above slopes greater than 20% (5H:1V) or above erosion
hazard areas without evaluation by a geotechnical engineer or qualified geologist
and City approval. Infiltration trenches should not be built on slopes steeper than
20%.
• For sites with septic systems, infiltration systems shall be downgradient of the
drainfield unless the site topography clearly prohibits surface flows from intersecting
the drainfield.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 316
Figure III-2-1. Typical Downspout Infiltration Trench
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 317
Figure III-2-2. Alternative Downspout Infiltration Trench System for Coarse Sand and Gravel
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 318
Figure III-2-3. Typical Downspout Dispersion Trench
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 319
2.1.3 Downspout Dispersion Systems
Downspout dispersion systems are splash blocks or dispersion facilities that spread roof runoff over
vegetated pervious areas. Dispersion attenuates peak flows by slowing entry of the runoff into the
conveyance system, allowing for some infiltration, and providing some water quality benefits. Also
refer to BMP L610, Downspout Dispersion, in Volume VI.
2.1.3.1 Application
Downspout dispersion may be used on all sites that cannot infiltrate roof runoff and that meet the
feasibility and setback requirements.
2.1.3.2 Flow Credit for Roof Downspout Dispersion
If roof runoff is dispersed according to the requirements of this section, and the vegetative flow1 path
of the roof runoff is 50 feet or greater through undisturbed native landscape or lawn/landscape area
that meets BMP L613, the roof area may be modeled as a grassed surface for both threshold
determination and modeling.
2.1.3.3 General Design Criteria
• Downspout dispersion trenches designed as shown in Figure III-2-3 should be used for
all downspout dispersion applications except where splash blocks are allowed.
• Perforated stub-out connections shall not be used.
• For sites with septic systems, the discharge point of all dispersion systems must be
downgradient of the drainfield. This requirement may be waived if site topography
clearly prohibits flows from intersecting the drainfield.
• For sites with septic systems, the discharge point must be downslope of the primary
and reserve drainfield areas. This requirement may be waived if site topography
clearly prohibits flows from intersecting the drainfield or where site conditions (soil
permeability, distance between systems, etc) indicate that this is unnecessary.
• Place all dispersion systems at least 5 feet from any property line. If necessary,
setbacks shall be increased from the minimum 5 feet in order to maintain a 1:1 side
slope for future excavation and maintenance.
• Setback dispersion systems from sensitive areas, steep slopes, landslide hazard
areas, and erosion hazard areas as governed by Auburn City Code.
• All dispersions systems shall be at least 10 feet from any structure. If necessary,
setbacks shall be increased from the minimum 10 feet in order to maintain a 1H:1V
side slope for future excavation and maintenance.
• No erosion or flooding of downstream properties shall result.
1 Vegetative flow path is measured from the downspout or dispersion system discharge point perpendicular to the
topographic contours to the downstream property line, stream, wetland, or other impervious surface.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 320
• Runoff discharged towards landslide hazard areas must be evaluated by a
geotechnical engineer or a licensed geologist, hydrogeologist, or engineering
geologist. The discharge point shall not be placed on or above slopes greater than
20% (5H:1V) or above erosion hazard areas without evaluation by a geotechnical
engineer or qualified geologist and City approval.
Design Criteria for Dispersion Trenches
• A vegetated flowpath of at least 25 feet in length must be maintained between the
outlet of the trench and any property line, structure, stream, wetland, or impervious
surface. A vegetated flowpath of at least 50 feet in length must be maintained between
the outlet of the trench and any slope, 20% or greater. Sensitive area buffers may
count towards flowpath lengths if approved by the City of Auburn.
• Trenches serving up to 700 square feet of roof area may be simple 10-foot-long by
2-foot-wide gravel filled trenches as shown in Figure III-2-3. For roof areas larger than
700 square feet, a dispersion trench with notched grade board may be used as
approved by the City. The total length of this design must not exceed 50 feet and must
provide at least 10 feet of trench per 700 square feet of roof area.
• Dispersion systems shall be setback from sensitive areas, steep slopes, landslide
hazard areas, and erosion hazard areas as governed by Auburn City Code.
Design Criteria for Splashblocks
A typical downspout splashblock is shown in Volume VI section 2.2.1.1 BMP L610 Downspout
Dispersion. In general, if the ground is sloped away from the foundation and there is adequate
vegetation and area for effective dispersion, splashblocks will adequately disperse storm runoff. If the
ground is fairly level, if the structure includes a basement, or if foundation drains are proposed,
splashblocks with downspout extensions may be a better choice because the discharge point is
moved away from the foundation. Downspout extensions can include piping to a
splashblock/discharge point a considerable distance from the downspout, as long as the runoff can
travel through a well-vegetated area as described below.
• A vegetated flow path of at least 50 feet shall be maintained between the discharge
point and any property line, structure, steep slope, stream, wetland, lake, or other
impervious surface. Sensitive area buffers may count toward flow path lengths. The
minimum spacing between splash blocks shall be 10 feet on a contour line.
• Flows shall not be directed onto sidewalks.
• A maximum of 700 square feet of roof area may drain to each splashblock.
• A splashblock or a pad of crushed rock (2 feet wide by 3 feet long by 6 inches deep)
shall be placed at each downspout discharge point.
• No erosion or flooding of downstream properties may result.
• Runoff discharged towards landslide hazard areas must be evaluated by a
professional engineer with geotechnical expertise or a licensed geologist,
hydrogeologist, or engineering geologist. Splash blocks may not be placed on or
above slopes greater than 20% (5H:1V) or above erosion hazard areas without
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 321
evaluation by a professional engineer with geotechnical expertise or qualified geologist
and City approval.
2.1.4 Bioinfiltration “Rain Gardens”
Purpose and Definition
Bioretention areas are shallow stormwater retention systems designed to mimic forested systems by
controlling stormwater through detention, infiltration, and evapotranspiration. Bioretention areas
provide water quality treatment through sedimentation, filtration, adsorption, and phytoremediation.
Bioretention facilities are integrated into the landscape to better mimic natural hydrologic conditions.
Bioretention facilities may be used as a water quality facility or a water quality and flow control
(retention) facility.
Use “Low Impact Development: Technical Guidance Manual for Puget Sound” and Washington State
University “Rain Garden Handbook for Western Washington Homeowners”, June 2007 as additional
guidance resources.
Applicability and Limitations
• Rain gardens can be used as on-lot retention facilities.
• Rain gardens may be used to receive roof runoff in areas where traditional infiltration is
not feasible.
• Three feet of clearance is necessary between the lowest elevation of the bioretention
soil or any underlying gravel layer and the seasonal high groundwater elevation or
other impermeable layer if the area tributary to the facility meets or exceeds any of the
following:
o 5000 square feet of pollution-generating impervious surface
o 10,000 square feet of impervious area
o ¾ acre of lawn and landscape
• For bioretention systems with a contributing area less than the above thresholds, a
minimum of 18 inches of clearance is required from the seasonal high groundwater or
other impermeable layer.
Setback and Site Constraints
• Assure that water movement through the surface soils and interflow will remain
unobstructed and soils will remain uncompacted.
• Locate bioretention facilities at least 10 feet from any structure or property line unless
approved in writing by the City.
• Locate bioretention facilities at least 50 feet back from slopes with a grade of 20% or
greater. A geotechnical analysis must be prepared addressing the potential impact of
the facility on the slope if closer than 50 feet or greater than 20%.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 322
Design Criteria
Flow Entrance/Presetting
• Flow velocity entering the facility should be less than 1 ft/sec.
• Use one of the four types of flow entrances:
o Dispersed, low velocity flow across a grade or landscape area.
o Pipe flow entrance. Include rock or other erosion protection material at the
facility entrance to dissipate energy and/or provide flow dispersion.
• Do not place woody plants directly in the entrance flow path as they can restrict or
concentrate flows.
• A minimum 1-inch grade change between the edge of a contributing impervious
surface and the vegetated flow entrance is required.
• Install flow diversion and erosion control measures to protect the bioretention area
from sedimentation until the upstream area is stabilized.
• If the catchment area exceeds 2,000 square feet, a presettling facility may be
required.
Cell Ponding Area
• The ponding area provides for surface storage and particulate settling,
• Ponding depth and drawdown rate provide variable conditions that allow for a range
of appropriate plant species. Soil must be allowed to dry out periodically in order to:
o Restore hydraulic capacity of system.
o Maintain infiltration rates.
o Maintain adequate soil oxygen levels for healthy soil biota and vegetation.
o Provide proper soil conditions for biodegradation and retention of pollutants.
o Prevent conditions supportive of mosquito breeding.
• The ponding depth shall be a maximum of 12 inches.
• The surface pool drawdown time shall be 24 hours.
• The minimum freeboard measured from the invert of the overflow pipe or earthen
channel to facility overtopping elevation shall be 2” for drainage areas less than
1,000 square feet and 6” for drainage areas 1,000 square feet or greater.
• If berming is used to achieve the minimum top elevation, maximum slope on berm
shall be 4H:1V, and minimum top width of design berm shall be 1 foot. Soil for
berming shall be imported bioretention soil or amended native soil compacted to a
minimum of 90% dry density.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 323
Overflow
• Unless designed for full infiltration of the entire runoff volume, bioretention systems
must include an overflow.
• A drain pipe installed at the designed maximum ponding elevation and connected to
a downstream BMP or an approved discharge point can be used as the overflow.
• Overflow shall be designed to convey the 100-year recurrence interval flow.
Soils
• For bioretention systems to meet the requirements for basic and enhanced treatment
the following requirements must be met:
• The bioretention soil mix (BSM) shall meet the following requirements:
o Have an infiltration rate between 1 and 2.4 inches per hour.
o The CEC (cation exchange capacity) must be at least 5 meq/100 grams of
dry soil.
o The soil mix should be about 40% by volume compost and about 60% by
volume aggregate component. The aggregate component shall meet the
specifications in Table III-2-3.
o The compost component shall be stable, mature, and derived from organic
waste materials including yard debris, wood wastes or other organic matter.
Compost must meet the Washington State compost regulations in WAC 173-
350-220, which is available at http://www.ecy.wa.gov/programs/swfa/compost
Table III-2-3. Bioretention Soil Mix Aggregate Component
Sieve Size Percent Passing
3/8” 100
#4 95-100
#10 75-90
#40 25-40
#100 4-10
#200 2-5
o Minimum depth of treatment soil must be 18 inches.
o Soil depths of 24” and greater should be considered to provide improved
removal of nutrients as needed, including phosphorus.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 324
• Provide a soils report, prepared by a soils professional, that addresses the following
for each bioretention area:
o A minimum of one soil log or test pit is required at each facility.
o The soil log shall extend a minimum of 4 feet below the bottom of the
subgrade (the lowest point of excavation).
o The soil log must describe the USDA textural class of the soil horizon through
the depth of the log and note any evidence of high groundwater level, such as
mottling.
Underdrain
Only install underdrains in bioretention areas if:
• Infiltration is not permitted and/or a liner is used, or
• Where infiltration rates are not adequate to meet the maximum pool drawdown
time.
• Where the facility is not utilized for infiltration.
Underdrain pipe diameter will depend on hydraulic capacity required, 6-inch minimum.
Use a geotextile fabric between the soil layer and underdrain.
Planting
• Plants must be tolerant of summer drought, ponding fluctuations, and saturated soil
conditions.
• Consider rooting depth when choosing plants. Roots must not damage underground
infrastructure.
• Locate slotted and perforated pipe at least 5 feet from tree roots and side sewer pipes.
• Consider adjacent plant communities and potential invasive species.
• Consider aesthetics, rain gardens should blend into surrounding landscapes.
• “Low Impact Development: Technical Guidance Manual for Puget Sound” is a good
tool for selecting proper bioretention vegetation.
Mulch Layer
• Bioretention areas should be designed with a mulch layer. Properly selected mulch
material reduces weed establishment, regulates soil temperatures and moisture, and
adds organic matter to soil. Mulch should be:
o Compost in the bottom of the facilities,
o Wood chip mulch composed of shredded or chipped hardwood or softwood
on cell slopes,
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 325
o Free of weed seeds, soil, roots, and other material that is not trunk or branch
wood and bark,
o A maximum of 3 inches thick for compost or 4 inches thick for wood chips.
• Mulch shall not include grass clippings, mineral aggregate or pure bark.
• A dense groundcover can be used as an alternative to mulch though mulch most be
used until the dense groundcover is established.
Modeling and Sizing
For sites with contributing area less than 2,000 square feet:
Table III-2-4 gives the square footage of the bottom of the rain garden per 1000 square feet of roof
area.
Table III-2-4. Sizing Table for Rain Gardens
Soil Type Raingarden bottom
(square feet)
Coarse sands and cobbles 25
Medium sands 60
Fine sands, loamy sands 130
Sandy loam 160
Loam 225
For sites with contributing areas 2,000 square feet or more:
Use WWHM and model the facility as an infiltration facility with appropriate stage-storage and
overflow/outflow rates. Bioretention cells may be modeled as a layer of soil with infiltration to
underlying soil, ponding and overflow. The tributary area, cell bottom area, and ponding depth should
be iteratively sized until the duration curves and/or peak volumes meet the flow control requirements.
NOTE: WWHM Pro has the ability to model bioretention areas with or without underdrains so facility
will be sized differently than described above. Contact the Washington State Department of Ecology
for more information. Use the assumptions in Table III-2-5 when sizing the facilities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 326
Table III-2-5. Modeling Assumptions for Rain Garden Sizing
Variable Assumption
Computational Time Step 15 minutes
Inflows to Facility Surface flow and interflow from drainage area routed to facility
Precipitation and Evaporation
Applied to Facility
Yes
Bioretention Soil Infiltration Rate For imported soils, for sites that have a contributing area of less
than 5,000 square feet of pollution generating surfaces, less
than 10,000 square feet of impervious area, and less than ¾
acre of landscaped area, reduce the infiltration rate of the BSM
by a factor of 2. For sites above these thresholds, a reductions
factor of 4 shall be applied.
For compost amended native soil, rate is equal to native soil
design infiltration rate.
Bioretention Soil Porosity 40%
Bioretention Soil Depth Minimum of 18 inches.
Native Soil Infiltration Rate Measured infiltration rate with applicable safety factors. See
Volume III for more information on infiltration rate determination.
Infiltration Across Wetted Surface
Area
Only if sides slopes are 3:1 or flatter
Overflow Overflow elevation set at maximum ponding elevation
(excluding freeboard). May be modeled as weir flow over rider
edge or riser notch.
Flow Credit
If roof runoff is infiltrated according to the requirements of this section, the roof area may be
discounted from the project area used for determining project thresholds and sizing stormwater
facilities.
2.1.5 Collect and Convey
Where it can be demonstrated that infiltration and dispersion are not feasible for roof downspout
controls, it may be allowable to collect and convey to the City stormwater system. This may be
either the curb, if present, or the actual pipe and structure conveyance system.
Conveyance to the curb will only be allowed if a catch basin is located within 350 feet
downstream of the discharge point. If a catch basin is not located within 350 feet of the
discharge location, a storm main extension shall be required.
Minimum pipe size for conveyance to the curb shall be 4 inches in diameter for single family
homes and a minimum of 6 inches in diameter for non-single family. Where capacity greater
than a 6 inch diameter pipe is required, the City shall review the proposal and may require a
storm main extension.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 327
For total roof areas 2,000 to 5,000 sf, roof runoff may be allowed to be collected and conveyed
to either the curb or directly connected to a structure. The runoff shall not be conveyed over
driveways, sidewalks or other areas reserved for pedestrian traffic. A detail for the discharge
shall be submitted to the City for review and approval.
For roof areas between 5,001 sf and 9,999 sf, roof runoff may be allowed to be collected and
conveyed to the curb or stormwater structure. Capacity analysis of the road gutter, conveyance
piping and catch basin leads will be required to ensure that adequate capacity exists. The City
may require more than one through curb outlet for discharge to the curb.
For roof areas 10,000 sf and greater, please refer to Minimum Requirement #7.
No flow credits will be allowed for the collect and convey option.
2.2 Infiltration Facilities for Stormwater Flow Control
2.2.1 Purpose
To provide infiltration capacity for stormwater runoff quantity and flow control. Infiltration facilities may
also be used for water quality treatment when designed appropriately.
2.2.2 Description
An infiltration BMP is typically an open basin (pond), trench, or buried perforated pipe used for
distributing the stormwater runoff into the underlying soil (See Figure III-2-4). (See Underground
Injection Control Program, Chapter 173-218 WAC).
The City prefers retention (infiltration) for storm drainage quantity control when soil conditions are
satisfactory for such application and water quality treatment can be provided.
Coarser more permeable soils can be used for quantity control provided that the stormwater
discharge does not cause a violation of groundwater quality criteria. Typically, treatment for removal
of TSS, oil, and/or soluble pollutants is necessary prior to conveyance to an infiltration BMP.
Use of the soil for treatment purposes is also an option as long as it is preceded by a pre-settling
basin or a basic treatment BMP. This section highlights design criteria that are applicable to infiltration
facilities serving a flow control function. See Volume V, Chapter 5 for design criteria for treatment.
2.2.3 Application
Infiltration facilities for flow control are used to convey stormwater runoff from new development or
redevelopment to the ground and groundwater after appropriate treatment. Infiltration facilities for
treatment purposes rely on the soil profile to provide treatment. In either case, runoff in excess of the
infiltration capacity of the facilities must be managed to comply with the flow control requirement in
Volume I, if flow control applies to the project.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 328
Figure III-2-4. Typical Infiltration Pond/Basin
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 329
Infiltration trenches can be considered for residential lots, commercial areas, parking lots, and open
space areas. Infiltration facilities can help accomplish the following:
• Groundwater recharge
• Discharge of uncontaminated or properly treated stormwater in compliance with
Ecology’s UIC regulations (Chapter 173-218 WAC)
• Retrofits in limited land areas:
• Flood control
• Streambank erosion control
2.2.4 Design Methodology
Two methodologies outlining the steps for designing infiltration systems are presented in this manual.
The simplified approach is outlined in Section 2.2.5 and the detailed approach is outlined in
Section 2.2.6.
2.2.5 Simplified Approach
The simplified approach was derived from high groundwater and shallow pond sites in western
Washington, and in general will produce `conservative’ designs. The simplified approach can be
used when determining the trial geometry of the infiltration facility, for small or low impact facilities, or
for facilities where a more conservative design is acceptable. The simplified approach is applicable to
ponds and trenches and includes the following steps:
Step 1. Select a location:
This will be based on the ability to convey flow to the location and the expected soil conditions of the
location. Conduct a preliminary surface and sub-surface characterization study (Section 2.2.7). Do a
preliminary check of Site Suitability Criteria (Section 2.2.10) to estimate feasibility.
Step 2. Estimate volume of stormwater, Vdesign:
Use WWHM to estimate the design. The runoff volume developed for the project site serves as input
to the infiltration basin.
For infiltration basins sized simply to meet treatment requirements, the basin must successfully
infiltrate 91% of the influent runoff volume. The remaining 9% of the influent volume can bypass the
infiltration facility. However, if the bypass discharges to a surface water that is not exempt from flow
control, the bypass must meet the flow control standard.
For infiltration basins sized to meet the flow control standard, the basin must infiltrate either all of the
influent volume, or a sufficient amount of the influent volume such that any overflow/bypass meets
the flow duration standard.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 330
Step 3. Develop trial infiltration facility geometry:
To accomplish this, an infiltration rate will need to be assumed based on previously available data, or
a default infiltration rate of 0.5 inches/hour can be used. This trial facility geometry should be used to
help locate the facility and for planning purposes in developing the geotechnical subsurface
investigation plan.
Step 4. Complete more detailed site characterization study and consider site suitability
criteria:
Information gathered during initial geotechnical and surface investigations are necessary to know
whether infiltration is feasible. The geotechnical investigation evaluates the suitability of the site for
infiltration, establishes the infiltration rate for design, and evaluates slope stability, foundation
capacity, and other geotechnical design information needed to design and assess constructability of
the facility.
See Sections 2.2.7 and 2.2.10.
Step 5. Determine the infiltration rate as follows:
Three possible methods for estimating the long-term infiltration rate are provided in Section 2.2.9.
Step 6. Size the facility:
Ensure that the maximum pond depth stays below the minimum required freeboard. If sizing a
treatment facility, document that the 91st percentile, 24-hour runoff volume (indicated by an approved
continuous simulation model) can infiltrate through the infiltration basin surface within 48 hours. This
can be calculated by multiplying a horizontal projection of the infiltration basin mid-depth dimensions
by the estimated long-term infiltration rate; and multiplying the result by 48 hours.
Step 7. Construct the facility:
Maintain and monitor the facility for performance.
2.2.6 Detailed Approach
This detailed approach was obtained from Massmann (2003). Procedures for the detailed approach
are as follows:
Step 1: Select a location:
This will be based on the ability to convey flow to the location and the expected soil conditions. The
minimum setback distances must also be met. See Section 2.2.10 Site Suitability Criteria and
setback distances.
Step 2: Estimate volume of stormwater, Vdesign:
Use WWHM to estimate Vdesign.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 331
Step 3: Develop a trial infiltration facility geometry based on length, width, and depth:
To accomplish this, either assume an infiltration rate based on previously available data, or use a
default infiltration rate of 0.5 inches/hour. This trial geometry should be used to help locate the facility,
and for planning purposes in developing the geotechnical subsurface investigation plan.
Step 4: Conduct a geotechnical investigation and consider site suitability criteria:
See Sections 2.2.7 and 2.2.10.
Step 5: Determine the saturated hydraulic conductivity as follows:
For each defined layer below the pond to a depth below the pond bottom of 2.5 times the maximum
depth of water in the pond, but not less than 6 feet, estimate the saturated hydraulic conductivity in
cm/sec using the following relationship (see Massmann 2003, and Massmann et al., 2003)
log10(Ksat) = -1.57 + 1.90D10 + 0.015D60 – 0.013D90 – 2.08Ffines (equation 1)
Where, D10, D60 and D90 are the grain sizes in mm for which 10 percent, 60 percent and 90 percent of
the sample is more fine and ffines is the fraction of the soil (by weight) that passes the #200 sieve (Ksat
is in cm/s).
If the licensed professional conducting the investigation determines that deeper layers will influence
the rate of infiltration for the facility, soil layers at greater depths must be considered when assessing
the site’s hydraulic conductivity characteristics. Massmann (2003) indicates that where the water
table is deep, soil or rock strata up to 100 feet below an infiltration facility can influence the rate of
infiltration. Note that only the layers near and above the water table or low permeability zone (e.g., a
clay, dense glacial till, or rock layer) need to be considered, as the layers below the groundwater
table or low permeability zone do not significantly influence the rate of infiltration. Also note that this
equation for estimating hydraulic conductivity assumes minimal compaction consistent with the use of
tracked (i.e., low to moderate ground pressure) excavation equipment. If the soil layer being
characterized has been exposed to heavy compaction, or is heavily consolidated due to its geologic
history (e.g., overridden by continental glaciers), the hydraulic conductivity for the layer could be
approximately an order of magnitude less than what would be estimated based on grain size
characteristics alone (Pitt, 2003). In such cases, compaction effects must be taken into account when
estimating hydraulic conductivity. For clean, uniformly graded sands and gravels, the reduction in Ksat
due to compaction will be much less than an order of magnitude. For well-graded sands and gravels
with moderate to high silt content, the reduction in Ksat will be close to an order of magnitude. For
soils that contain clay, the reduction in Ksat could be greater than an order of magnitude.
For critical designs, the in-situ saturated conductivity of a specific layer can be obtained through field
tests such as the packer permeability test (above or below the water table), the piezocone (below the
water table), an air conductivity test (above the water table), or through the use of a pilot infiltration
test (PIT) as described in Volume III, Appendix B. Note that these field tests generally provide a
hydraulic conductivity combined with a hydraulic gradient (i.e., Equation 5). In some of these tests,
the hydraulic gradient may be close to 1.0; therefore, in effect, the magnitude of the test result is the
same as the hydraulic conductivity. In other cases, the hydraulic gradient may be close to the
gradient that is likely to occur in the full-scale infiltration facility. This issue will need to be evaluated
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 332
on a case-by-case basis when interpreting the results of field tests. It is important to recognize that
the gradient in the test may not be the same as the gradient likely to occur in the full-scale infiltration
facility in the long-term (i.e., when groundwater mounding is fully developed).
Once the saturated hydraulic conductivity for each layer has been identified, determine the effective
average saturated hydraulic conductivity below the pond. Hydraulic conductivity estimates from
different layers can be combined using the harmonic mean:
(equation 2)
Where, d is the total depth of the soil column, di is the thickness of layer “i” in the soil column, and Ki
is the saturated hydraulic conductivity of layer “i” in the soil column. The depth of the soil column, d,
typically would include all layers between the pond bottom and the water table. However, for sites
with very deep water tables (>100 feet) where groundwater mounding to the base of the pond is not
likely to occur, it is recommended that the total depth of the soil column in Equation 2 be limited to
approximately 20 times the depth of pond. This is to ensure that the most important and relevant
layers are included in the hydraulic conductivity calculations. Deep layers that are not likely to affect
the infiltration rate near the pond bottom should not be included in Equation 2. Equation 2 may over-
estimate the effective hydraulic conductivity value at sites with low conductivity layers immediately
beneath the infiltration pond. For sites where the lowest conductivity layer is within five feet of the
base of the pond, it is suggested that this lowest hydraulic conductivity value be used as the
equivalent hydraulic conductivity rather than the value from Equation 2. The harmonic mean given by
Equation 2 is the appropriate effective hydraulic conductivity for flow that is perpendicular to
stratigraphic layers, and will produce conservative results when flow has a significant horizontal
component such as could occur due to groundwater mounding.
Step 6: Calculate the hydraulic gradient as follows:
The steady state hydraulic gradient is calculated as follows:
(equation 3)
Where, Dwt is the depth from the base of the infiltration facility to the water table in feet, K is the
saturated hydraulic conductivity in feet/day, Dpond is the depth of water in the facility in feet (see
Massmann et al., 2003, for the development of this equation), and CFsize, is the correction for pond
size. The correction factor was developed for ponds with bottom areas between 0.6 and 6 acres in
size. For small ponds (ponds with area equal to 2/3 acre), the correction factor is equal to 1.0. For
large ponds (ponds with area equal to 6 acres), the correction factor is 0.2, as shown in Equation 4.
(equation 4)
=
i
i
equiv
K
d
dK
size
pondwt CF
K
DD
)(62.138
igradient 1.0
+=
76.0)(73.0 -=pondsizeACF
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 333
Where, Apond is the area of pond bottom in acres. This equation generally will result in a calculated
gradient of less than 1.0 for moderate to shallow groundwater depths (or to a low permeability layer)
below the facility, and conservatively accounts for the development of a groundwater mound. A more
detailed groundwater mounding analysis using a program such as MODFLOW will usually result in a
gradient that is equal to or greater than the gradient calculated using Equation 3. If the calculated
gradient is greater than 1.0, the water table is considered to be deep, and a maximum gradient of 1.0
must be used. Typically, a depth to groundwater of 100 feet or more is required to obtain a gradient
of 1.0 or more using this equation. Since the gradient is a function of depth of water in the facility, the
gradient will vary as the pond fills during the season. The gradient could be calculated as part of the
stage-discharge calculation used in the continuous runoff models. As of the date of this update,
neither the WWHM or MGSFlood have that capability. However, updates to those models may soon
incorporate the capability. Until that time, use a steady-state hydraulic gradient that corresponds with
a ponded depth of ¼ of the maximum ponded depth – as measured from the basin floor to the
overflow.
Step 7: Calculate the infiltration rate using Darcy’s law as follows:
(equation 5)
Where, f is the specific discharge or infiltration rate of water through a unit cross-section of the
infiltration facility (L/t), K is the hydraulic conductivity (L/t), dh/dz is the hydraulic gradient (L/L), and “i”
is the gradient.
Step 8: Adjust infiltration rate or infiltration stage-discharge relationship obtained in Steps 6
and 7:
This is done to account for reductions in the rate resulting from long-term siltation and biofouling,
taking into consideration the degree of long-term maintenance and performance monitoring
anticipated, the degree of influent control (e.g., pre-settling ponds biofiltration swales, etc.), and the
potential for siltation, litterfall, moss buildup, etc. based on the surrounding environment. It should be
assumed that an average to high degree of maintenance will be performed on these facilities. A low
degree of maintenance should be considered only when there is no other option (e.g., access
problems). The infiltration rate estimated in Step 8 and 9 is multiplied by the reduction factors
summarized in Table III-2-6.
Table III-2-6. Infiltration Rate Reduction Factors to Account for
Biofouling and Siltation Effects for Ponds
Potential for Biofouling Degree of Long-Term
Maintenance/Performance Monitoring
Infiltration Rate Reduction
Factor (CFsilt/bio)
Low Average to High 0.9
Low Low 0.6
High Average to High 0.5
High Low 0.2
(Massman, 2003)
Kidz
dhKf ==
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 334
The values in this table assume that final excavation of the facility to the finished grade is deferred
until all disturbed areas in the upgradient drainage area have been stabilized or protected (e.g.,
construction runoff is not allowed into the facility after final excavation of the facility). Ponds located in
shady areas where moss and litterfall from adjacent vegetation can build up on the pond bottom and
sides, the upgradient drainage area will remain in a disturbed condition long-term, and no
pretreatment (e.g., pre-settling ponds, biofiltration swales, etc.) is provided, are one example of a
situation with a high potential for biofouling. A low degree of long-term maintenance includes, for
example, situations where access to the facility for maintenance is very difficult or limited, or where
there is minimal control of the party responsible for enforcing the required maintenance. A low degree
of maintenance should be considered only when there is no other option.
Also adjust this infiltration rate for the effect of pond aspect ratio by multiplying the infiltration rate
determined in Step 7 (Equation 5) by the aspect ratio correction factor Faspect as shown in the
following equation:
CFaspect = 0.02Ar + 0.98 (equation 6)
Where, Ar is the aspect ratio for the pond (length/width). In no case shall CFaspect be greater than
1.4.
The final infiltration rate will therefore be as follows:
f = Ki x CFaspect x CFsilt/bio (equation 7)
The rates calculated based on Equations 5 and 7 are long-term design rates. No additional reduction
factor or factor of safety is needed.
Step 9: Size the facility:
Size the facility to ensure that the desirable pond depth is three feet, with one-foot minimum required
freeboard. The maximum allowable pond depth is six feet.
Where the infiltration facility is being used to meet treatment requirements, check that the 91st
percentile, 24-hour runoff volume (indicated by WWHM or MGS Flood) can infiltrate through the
infiltration basin surface within 48 hours. This can be calculated by multiplying a horizontal projection
of the infiltration basin mid-depth dimensions by the estimated long-term infiltration rate; and
multiplying the result by 48 hours. Finally, check to make sure that the basin can drain its maximum
ponded water depth within 24 hours.
Step 10: Construct the facility:
Maintain and monitor the facility for performance in accordance with Section 2.2.11.
2.2.7 Site Characterization Criteria
One of the first steps in siting and designing infiltration facilities is to conduct a characterization study.
Information gathered during initial geotechnical investigations can be used for the site
characterization.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 335
2.2.7.1 Surface Features Characterization
• Topography within 500 feet of the proposed facility.
• Anticipated site use (street/highway, residential, commercial, high-use site).
• Location of water supply wells within 500 feet of proposed facility.
• Location of groundwater protection areas and/or 1, 5 and 10 year time of travel
zones for municipal well protection areas.
• A description of local site geology, including soil or rock units likely to be
encountered, the groundwater regime, and geologic history of the site.
2.2.7.2 Subsurface Characterization
• Conduct pit/hole explorations during the wet season (December 1st through April
30th) to provide accurate groundwater saturation and groundwater information.
• Subsurface explorations (test holes or test pits) to a depth below the base of the
infiltration facility of at least 5 times the maximum design depth of ponded water
proposed for the infiltration facility,
• Continuous sampling (representative samples from each soil type and/or unit within
the infiltration receptor) to a depth below the base of the infiltration facility of
2.5 times the maximum design ponded water depth, but not less than 6 feet.
• For basins, at least one test pit or test hole per 5,000 ft2 of basin infiltrating surface
(in no case less than two per basin).
• For trenches, at least one test pit or test hole per 50 feet of trench length (in no case
less than two per trench).
The depth and number of test holes or test pits, and samples should be increased, if in the judgment
of a licensed engineer with geotechnical expertise (P.E.), a licensed geologist, engineering geologist,
hydrogeologist, or other licensed professional acceptable to the City, the conditions are highly
variable and such increases are necessary to accurately estimate the performance of the infiltration
system. The exploration program may also be decreased if, in the opinion of the licensed engineer or
other professional, the conditions are relatively uniform and the borings/test pits omitted will not
influence the design or successful operation of the facility. In high water table sites, the subsurface
exploration sampling need not be conducted lower than two (2) feet below the groundwater table.
Prepare detailed logs for each test pit or test hole and a map showing the location of the test pits or
test holes. Logs must include at a minimum, depth of pit or hole, soil descriptions, depth to water,
presence of stratification (Logs must substantiate whether stratification does or does not exist. The
licensed professional may consider additional methods of analysis to substantiate the presence of
stratification that will significantly impact the design of the infiltration facility).
2.2.7.3 Infiltration Rate Determination
Determine the representative infiltration rate of the unsaturated vadose zone based on infiltration
tests and/or grain-size distribution/texture (see next section). Determine site infiltration rates using the
Pilot Infiltration Test (PIT) described in Volume III, Appendix B, if practicable. Such site testing should
be considered to verify infiltration rate estimates based on soil size distribution and textural analysis.
Infiltration rates may also be estimated based on soil grain-size distributions from test pits or test hole
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 336
samples (particularly where a sufficient source of water does not exist to conduct a pilot infiltration
test). As a minimum, one soil grain-size analysis per soil stratum in each test hole shall be performed
within 2.5 times the maximum design water depth, but not less than 6 feet.
2.2.7.4 Soil Testing
Soil characterization for each soil unit (soils of the same texture, color, density, compaction,
consolidation and permeability) encountered should include:
• Grain-size distribution (ASTM D422 or equivalent AASHTO specification)
• Textural class (USDA) (See Figure III-2-5).
• Percent clay content (include type of clay, if known)
• Color/mottling
• Variations and nature of stratification
If the infiltration facility will be used to provide treatment as well as flow control, the soil
characterization should also include cation exchange capacity (CEC) and organic matter content for
each soil type and strata. Where distinct changes in soil properties occur, perform analysis to a depth
below the base of the facility of at least 2.5 times the maximum design water depth, but not less than
6 feet. Consider if soils are already contaminated, thus diminishing pollutant sorptive capacity.
For soils with low CEC and organic content, deeper characterization of soils may be warranted (refer
to Section 2.2.10 Site Suitability Criteria)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 337
Figure III-2-5. USDA Textural Triangle2
2.2.7.5 Infiltration Receptor
The requirements of this section will be applied as directed by the City. Infiltration receptor
(unsaturated and saturated soil receiving the stormwater) characterization should include:
• Installation of groundwater monitoring wells (at least three per infiltration facility, or
three hydraulically connected surface and groundwater features that will establish a
three-dimensional relationship for the groundwater table, unless the highest
groundwater level is known to be at least 50 feet below the proposed infiltration
facility) to:
o Monitor the seasonal groundwater levels at the site during at least one wet
season, and,
2 Shaded area is applicable for design of infiltration BMPs. Source, U.S. Department of Agriculture
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 338
o Consider the potential for both unconfined and confined aquifers, or confining
units, at the site that may influence the proposed infiltration facility as well as
the groundwater gradient. Other approaches to determine groundwater levels
at the proposed site could be considered if pre-approved by the City, and
o Determine the ambient groundwater quality, if that is a concern.
• An estimate of the volumetric water holding capacity of the infiltration receptor soil.
This is the soil layer below the infiltration facility and above the seasonal high-water
mark, bedrock, hardpan, or other low permeability layer. This analysis should be
conducted at a conservatively high infiltration rate based on vadose zone porosity,
and the water quality runoff volume to be infiltrated. This, along with an analysis of
groundwater movement, will be useful in determining if there are volumetric
limitations that would adversely affect drawdown.
• Determination of:
o Depth to groundwater table and to bedrock/impermeable layers
o Seasonal variation of groundwater table based on well water levels and
observed mottling
o Existing groundwater flow direction and gradient
o Lateral extent of infiltration receptor
o Horizontal hydraulic conductivity of the saturated zone to assess the aquifer’s
ability to laterally transport the infiltrated water.
• Impact of the infiltration rate and volume at the project site on groundwater
mounding, flow direction, and water table; and the discharge point or area of the
infiltrating water. A groundwater mounding analysis should be conducted at all sites
where the depth to seasonal groundwater table or low permeability stratum is less
than 15 feet and the runoff to the infiltration facility is from more than one acre. (The
site professional may consider conducting an aquifer test, or slug test to aid in
determining the type of groundwater mounding analysis necessary at the site)
A detailed soils and hydrogeologic investigation should be conducted if potential pollutant
impacts to groundwater are a concern, or if the applicant is proposing to infiltrate in areas
underlain by till or other impermeable layers. (Suggested references: “Implementation
Guidance for the Groundwater Quality Standards”, Department of Ecology, publication 96-2,
2005).
2.2.8 Design Infiltration Rate Determination – Guidelines and Criteria
Infiltration rates can be determined using either a correlation to grain size distribution from soil
samples, textural analysis, or by in-situ field measurements. Short-term infiltration rates up to 2.4 in/hr
represent soils that typically have sufficient treatment properties. Long-term infiltration rates are used
for sizing the infiltration pond based on maximum pond level and drawdown time. Long-term
infiltration rates up to 2.0 inches per hour can also be considered for treatment if SSC-4 and SSC-6
are met, as defined in Section 2.2.10.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 339
Historically, infiltration rates have been estimated from soil grain size distribution (gradation) data
using the United States Department of Agriculture (USDA) textural analysis approach. To use the
USDA textural analysis approach, the grain size distribution test must be conducted in accordance
with the USDA test procedure (SOIL SURVEY MANUAL, U.S. Department of Agriculture, October
1993, page 136). This manual only considers soil passing the #10 sieve (2 mm) (U.S. Standard) to
determine percentages of sand, silt, and clay for use in Figure III-2-5 (USDA Textural Triangle).
However, many soil test laboratories use the ASTM soil size distribution test procedure (ASTM
D422), which considers the full range of soil particle sizes, to develop soil size distribution curves.
The ASTM soil gradation procedure must not be used with Figure III-2-5 to perform USDA soil
textural analyses.
2.2.9 Three Methods for Determining Long-term Infiltration Rates for Sizing
Infiltration Facilities
For designing the infiltration facility the site professional must select one of the three methods
described below that will best represent the long-term infiltration rate at the site. The long-term
infiltration rate should be used for routing and sizing the basin/trench for the maximum drawdown
time of 48 hours. If the pilot infiltration test (Table III-2-9) or ASTM gradation approach (Table III-2-8)
is selected corroboration with a textural based infiltration rate (Table III-2-7) is also desirable.
Appropriate correction factors must be applied as specified. Verification testing of the completed
facility is strongly encouraged and may be required by the City. (See Section 2.2.10.8 - Verification
Testing)
1. USDA Soil Textural Classification
Table III-2-7 provides the correlation between USDA soil texture and infiltration rates for estimating
infiltration rates for homogeneous soils based on gradations from soil samples and textural analysis.
The USDA soil texture – infiltration rate correlation in Table III-2-7 is based on the correlation
developed by Rawls, et al (1982), but with minor changes in the infiltration rates based on
WEF/ASCE (1998). The infiltration rates provided through this correlation represent short-term
conservative rates for homogeneous soils. These rates do not account for the effects of site
variability, long-term clogging due to siltation and biomass buildup in the infiltration facility, or other
processes that can decrease infiltration rates. Correction factors must be applied to these rates.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 340
Table III-2-7. Recommended Infiltration Rates based on USDA Soil Textural Classification
Short-Term
Infiltration Rate
(in/hr)1
Correction
Factor (CF)
Estimated Long-Term
(Design) Infiltration Rate
(in/hr)
Clean, sandy gravels and gravelly
sands (i.e., 90% of the total soil
sample is retained in the #10 sieve)
20 2 102
Sand 8 4 23
Loamy sand 2 4 0.5
Sandy loam 1 4 0.25
Loam 0.5 4 0.13
1 From WEF/ASCE, 1998 2 Not recommended for treatment
3 Refer to SSC-4 and SSC-6 for treatment acceptability criteria
Based on experience with long-term full-scale infiltration pond performance, Ecology’s Technical
Advisory Committee (TAC) recommends that the short-term infiltration rates be reduced as shown in
Table III-2-7, dividing by a correction factor of 2 to 4, depending on the soil textural classification. The
correction factors provided in Table III-2-7 represent an average degree of long-term facility
maintenance, TSS reduction through pretreatment, and site variability in the subsurface conditions.
These conditions might include deposits of ancient landslide debris, buried stream channels, lateral
grain size variability, and other factors that affect homogeneity).
These correction factors could be reduced, subject to the approval of the local jurisdiction, under the
following conditions:
For sites with little soil variability,
• Where there will be a high degree of long-term facility maintenance,
• Where specific, reliable pretreatment is employed to reduce TSS entering the
infiltration facility
In no case shall a correction factor less than 2.0 be used.
Correction factors higher than those provided in Table III-2-7 should be considered for situations
where long-term maintenance will be difficult to implement, where little or no pretreatment is
anticipated, or where site conditions are highly variable or uncertain. These situations require the use
of best professional judgment by the site engineer and the approval of the local jurisdiction. An
Operation and Maintenance plan and a financial bonding plan may be required by the local
jurisdiction.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 341
2. ASTM Gradation Testing at Full Scale Infiltration Facilities
As an alternative to Table III-2-7, recent studies by Massmann and Butchart (2000) were used to
develop the correlation provided in Table III-2-8. These studies compare infiltration measurements
from full-scale infiltration facilities to soil gradation data developed using the ASTM procedure (ASTM
D422). The primary source of the data used by Massmann and Butchart was from Wiltsie (1998),
who included limited infiltration studies only on Thurston County sites. However, Massmann and
Butchart also included limited data from King and Clark County sites in their analysis. This table
provides recommended long-term infiltration rates that have been correlated to soil gradation
parameters using the ASTM soil gradation procedure.
Table III-2-8 can be used to estimate long-term design infiltration rates directly from soil gradation
data. The City may require additional correction factors be applied to the values shown in Table III-2-
8 depending on the site conditions. As is true of Table III-2-7, the long-term rates provided in Table
III-2-8 represent average conditions regarding site variability, the degree of long-term maintenance
and pretreatment for TSS control, and represent a moderate depth to groundwater below the pond.
The long-term infiltration rates in Table III-2-8 may need to be decreased if the site is highly variable,
the groundwater table is shallow, there is fine layering present that would not be captured by the soil
gradation testing, or if maintenance and influent characteristics are not well controlled. The data that
forms the basis for Table III-2-8 was from soils that would be classified as sands or sandy gravels. No
data was available for finer soils at the time the table was developed. Therefore, Table III-2-8 should
not be used for soils with a D10 size (10% passing the size listed) less than 0.05 mm (U.S. Standard
Sieve).
Table III-2-8. Alternative Recommended Infiltration Rates
Based on ASTM Gradation Testing
D10 Size from ASTM D422 Soil Gradation Test
(mm)
Estimated Long-Term (Design) Infiltration Rate
(in/hr)
> 0.4 91
0.3 6.51
0.2 3.51
0.1 2.02
0.05 0.8
1 Not recommended for treatment
2 Refer to SSC-4 and SSC-6 for treatment acceptability criteria
The infiltration rates provided in Table III-2-7 and Table III-2-8 represent rates for homogeneous soil
conditions. If more than one soil unit is encountered within 6 feet of the base of the facility or
2.5 times the proposed maximum water design depth, use the lowest infiltration rate determined from
each of the soil units as the representative site infiltration rate.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 342
If soil mottling, fine silt or clay layers, which cannot be fully represented in the soil gradation tests, are
present below the bottom of the infiltration pond, the infiltration rates provided in the tables will be too
high and should be reduced. Based on limited full-scale infiltration data (Massmann and Butchart,
2000; Wiltsie, 1998), it appears that the presence of mottling indicates soil conditions that reduce the
infiltration rate for homogeneous conditions by a factor of 3 to 4.
3. In-situ Infiltration Measurements
Where feasible, Ecology encourages in-situ infiltration measurements, using a procedure such as the
Pilot Infiltration Test (PIT) described in Volume III, Appendix B. Small-scale infiltration tests such as
the EPA Falling Head or double ring infiltrometer test (ASTM D3385-88) are not recommended
unless modified versions are approved in writing by The City. These small-scale infiltration tests tend
to seriously overestimate infiltration rates and, based on recent Ecology experience, are considered
unreliable.
The infiltration rate obtained from the PIT test shall be considered to be a short-term rate. This short-
term rate must be reduced through correction factors to account for site variability and number of
tests conducted, degree of long-term maintenance and influent pretreatment/control, and potential for
long-term clogging due to siltation and bio-buildup.
The typical range of correction factors to account for these issues, based on Ecology experience, is
summarized in Table III-2-9. The range of correction factors is for general guidance only. The specific
correction factors used shall be determined based on the professional judgment of the licensed
engineer or other soils professional considering all issues which may affect the long-term infiltration
rate, subject to the approval of The City.
Table III-2-9. Correction Factors to be Used with In-Situ Infiltration
Measurements to Estimate Long-Term Design Infiltration Rates
Issue Partial Correction Factor
Site variability and number of locations tested CFy = 1.5 to 6
Degree of long-term maintenance to prevent siltation and bio-buildup CFm = 2 to 6
Degree of influent control to prevent siltation and bio-buildup CFi = 2 to 6
Total Correction Factor (CF) = CFy + CFm + CFi
The following discussions are to provide assistance in determining the partial correction factors to
apply in Table III-2-9.
Site variability and number of locations tested – The number of locations tested must be capable
of producing a picture of the subsurface conditions that fully represents the conditions throughout the
facility site. The partial correction factor used to compensate for site variability depends on the level of
uncertainty that adverse subsurface conditions may occur. If the range of uncertainty is low - for
example, conditions are known to be uniform through previous exploration and site geological factors
- one pilot infiltration test may be adequate to justify a partial correction factor at the low end of the
range. If the level of uncertainty is high, a partial correction factor near the high end of the range may
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 343
be appropriate. This might be the case where the site conditions are highly variable due to a deposit
of ancient landslide debris, or buried stream channels. In these cases, even with many explorations
and several pilot infiltration tests, the level of uncertainty may still be high. A partial correction factor
near the high end of the range could be assigned where conditions have a more typical variability, but
few explorations and only one pilot infiltration test is conducted. That is, the number of explorations
and tests conducted do not match the degree of site variability anticipated.
Degree of long-term maintenance to prevent siltation and bio-buildup – The standard of
comparison here is the long-term maintenance requirements provided in Volume I, Appendix D, and
any additional requirements by local jurisdictional authorities. Full compliance with these
requirements would be justification to use a partial correction factor at the low end of the range. If
there is a high degree of uncertainty that long-term maintenance will be carried out consistently, or if
the maintenance plan is poorly defined, a partial correction factor near the high end of the range may
be justified.
Degree of influent control to prevent siltation and bio-buildup – A partial correction factor near
the high end of the range may be justified under the following circumstances:
• If the infiltration facility is located in a shady area where moss buildup or litter fall
buildup from the surrounding vegetation is likely and cannot be easily controlled
through long-term maintenance
• If there is minimal pre-treatment, and the influent is likely to contain moderately high
TSS levels.
• If influent into the facility can be well controlled such that the planned long-term
maintenance can easily control siltation and biomass buildup, then a partial
correction factor near the low end of the range may be justified.
The determination of long-term design infiltration rates from in-situ infiltration test data involves a
considerable amount of engineering judgment. Therefore, when reviewing or determining the final
long-term design infiltration rate the results of both textural analyses and in-situ infiltration tests
results will be considered when available and may be required by the City.
2.2.10 Site Suitability Criteria (SSC)
This section provides criteria that must be considered for siting infiltration systems. When a site
investigation reveals that any of the applicable criteria cannot be met appropriate mitigation
measures must be implemented so that the infiltration facility will not pose a threat to safety, health,
and the environment.
For site selection and design decisions a geotechnical and hydrogeologic report should be prepared
by a qualified engineer with geotechnical and hydrogeologic experience, or a licensed geologist,
hydrogeologist, or engineering geologist. The design engineer may utilize a team of certified or
registered professionals in soil science, hydrogeology, geology, and other related fields.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 344
2.2.10.1 SSC-1 Setback Criteria
Setback requirements contained within this manual and other applicable setbacks include those
contained within the uniform building code requirements, City of Auburn Zoning and Building Codes,
County Health District requirements, Washington State Department of Health On-Site Sewage
Systems Chapter 246-272A WAC, and other state regulations.
These additional setback requirements may be required as determined by the project engineer
and/or the City.
• Drinking water wells, septic tanks or drainfields, and springs used for public drinking
water supplies (DOH, Publication # 333-117, Chapter 246-272A WAC).
• Infiltration facilities upgradient of drinking water supplies and within 1, 5, and 10-year
time of travel zones must comply with Health Dept. requirements (Washington
Wellhead Protection Program, DOH, Publication #331-018).
• Additional setbacks must be considered if roadway deicers or herbicides are likely to
be present in the influent to the infiltration system.
• Building foundations within 20 feet downslope and within100 feet upslope
• Native Growth Protection Easement (NGPE) within 20 feet
• From the top of slopes >20% and within 50 feet.
• Evaluate on-site and off-site structural stability due to extended subgrade saturation
and/or head loading of the permeable layer, including the potential impacts to
downgradient properties, especially on hills with known side-hill seeps.
2.2.10.2 SSC-2 Groundwater Protection Areas
A site is not suitable if the infiltration facility will cause a violation of Ecology's Groundwater Quality
Standards (See SSC-9 for verification testing guidance).
2.2.10.3 SSC-3 High Vehicle Traffic Areas
An infiltration BMP may be considered for runoff from areas of industrial activity and the high vehicle
traffic areas described below. For such applications sufficient pollutant removal (including oil removal)
must be provided upstream of the infiltration facility to ensure that groundwater quality standards will
not be violated and that the infiltration facility is not adversely affected.
High Vehicle Traffic Areas are:
• Commercial or industrial sites subject to an expected average daily traffic count
(ADT) 100 vehicles/1,000 ft² gross building area (trip generation), and
• Road intersections with an ADT of 25,000 on the main roadway, or 15,000 on
any intersecting roadway.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 345
2.2.10.4 SSC-4 Drawdown Time
Infiltration facilities designed for flow control do not have a required drawdown time criteria.
2.2.10.5 SSC-5 Depth to Bedrock, Water Table, or Impermeable Layer
The base of all infiltration basins or trench systems shall be 5 feet above the seasonal high-water
mark, bedrock (or hardpan) or other low permeability layer. A separation down to 3 feet may be
considered if the groundwater mounding analysis, volumetric receptor capacity, and the design of the
overflow and/or bypass structures are judged by the site professional and the City to be adequate to
prevent overtopping and meet the site suitability criteria specified in this section.
2.2.10.6 SSC-6 Seepage Analysis and Control
Determine whether there would be any adverse effects caused by seepage zones on nearby building
foundations, basements, roads, parking lots or sloping sites.
2.2.10.7 SSC-7 Cold Climate and Impact of Roadway Deicers
For cold climate design criteria (snowmelt/ice impacts) refer to D. Caraco and R. Claytor Design
Supplement for Stormwater BMPs in Cold Climates, Center for Watershed Protection, 1997.
Potential impact of roadway deicers on potable water wells must be considered in the siting
determination. Mitigation measures must be implemented if infiltration of roadway deicers can cause
a violation of groundwater quality standards.
2.2.10.8 SSC-8 Verification Testing of the Completed Facility
Verification testing of the completed full-scale infiltration facility is recommended to confirm that the
design infiltration parameters are adequate. The site professional should determine the duration and
frequency of the verification testing program including the monitoring program for the potentially
impacted groundwater. The groundwater monitoring wells installed during site characterization (See
Section 2.2.7) may be used for this purpose. Long-term (more than two years) in-situ drawdown and
confirmatory monitoring of the infiltration facility would be preferable (See King County reference).
The City may require verification testing on a site-by-site basis.
2.2.11 Design Criteria for Infiltration Facilities
The design criteria for infiltration facilities shall be the same as for detention ponds described in
Section 2.3.1.2 as applicable. All retention ponds shall be appropriately and aesthetically located,
designed and planted. Pre-approval of the design concept, including landscaping, is required by the
City for all proposed public ponds. The size of the infiltration facility can be determined by routing the
influent runoff file generated by the continuous runoff model through it. The primary mode of
discharge from an infiltration facility is infiltration into the ground. However, when the infiltration
capacity of the facility is reached, additional runoff to the facility will cause the facility to overflow.
Overflows from an infiltration facility must comply with the Minimum Requirement #7 for flow control
in Volume I. Infiltration facilities used for runoff treatment must not overflow more than 9% of the
influent runoff volume.
In order to determine compliance with the flow control requirements, the Western Washington
Hydrology Model (WWHM) must be used.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 346
(A) For 100% infiltration
Ensure that the pond infiltrates 100% using the pond bottom area only.
(B) For 91% infiltration (water quality treatment volume)
Ensure that the pond infiltrates 91% using the pond bottom area only.
Infiltration facilities for treatment can be located upstream or downstream of detention and can be off-
line or on-line.
• On-line treatment facilities placed upstream or downstream of a detention facility
must be sized to infiltrate 91% of the runoff volume directed to it.
• Off-line treatment facilities placed upstream of a detention facility must have a flow
splitter designed to send all flows at or below the 15-minute water quality flow rate,
as predicted by WWHM to the treatment facility. The treatment facility must be sized
to infiltrate all the runoff sent to it (no overflows from the treatment facility are
allowed).
• Off-line treatment facilities placed downstream of a detention facility must have a
flow splitter designed to send all flows at or below the 2-year flow frequency from the
detention pond, as predicted by WWHM to the treatment facility. The treatment
facility must be sized to infiltrate all the runoff sent to it (no overflows from the
treatment facility are allowed).
See Volume V, Section 3.5.1 for flow splitter design details.
(C) To meet flow duration standard with infiltration ponds
This design will allow something less than 100% infiltration as long as any overflows will meet the
flow duration standard. You would need a discharge structure with orifices and risers similar to a
detention facility except that, in addition, you also have infiltration occurring from the pond.
Slope of the base of the infiltration facility must be <3 percent.
Spillways/overflow structures – A non-erodible outlet or spillway with a firmly established elevation
must be constructed to discharge overflow. Ponding depth, drawdown time, and storage volume are
calculated from that reference point.
For infiltration treatment facilities, side-wall seepage is not a concern if seepage occurs through the
same stratum as the bottom of the facility. However, for engineered soils or for soils with very low
permeability, the potential to bypass the treatment soil through the side-walls may be significant. In
those cases, the side-walls must be lined, either with an impervious liner or with at least 18 inches of
treatment soil, to prevent seepage of untreated flows through the side walls.
2.2.12 Construction Criteria
Initial basin excavation should be conducted to within 1-foot of the final elevation of the basin floor.
Excavate infiltration trenches and basins to final grade only after all disturbed areas in the upgradient
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 347
project drainage area have been permanently stabilized. The final phase of excavation should
remove all accumulation of silt in the infiltration facility before putting it in service. After construction is
completed, prevent sediment from entering the infiltration facility by first conveying the runoff water
through an appropriate pretreatment system such as a pre-settling basin, wet pond, or sand filter.
Infiltration facilities should generally not be used as temporary sediment traps during construction. If
an infiltration facility is to be used as a sediment trap, it must not be excavated to final grade until after
the upgradient drainage area has been stabilized. Any accumulation of silt in the basin must be
removed before putting it in service.
Traffic Control – Relatively light-tracked equipment is recommended for this operation to avoid
compaction of the basin floor. The use of draglines and trackhoes should be considered for
constructing infiltration basins. The infiltration area should be flagged or marked to keep heavy
equipment away.
2.2.13 Maintenance Criteria
Provisions must be made for regular and perpetual maintenance of the infiltration basin/trench,
including replacement and/or reconstruction of the any media that are relied upon for treatment
purposes. Maintain when water remains in the basin or trench for more than 24 hours after the end of
a rainfall event, or when overflows occur more frequently than planned. Off-line infiltration facilities
should not overflow. Infiltration facilities designed to completely infiltrate all flows to meet flow control
standards should not overflow. An Operation and Maintenance Plan, approved by the local
jurisdiction, must ensure that the desired infiltration rate is maintained.
Adequate access for operation and maintenance must be included in the design of infiltration basins
and trenches.
Removal of accumulated debris/sediment in the basin/trench should be conducted every 6 months or
as needed to prevent clogging, or when water remains in the pond for greater than 24 hours after the
end of a rainfall event.
For more detailed information on maintenance, see Volume I, Appendix D – Maintenance Standards
for Drainage Facilities.
2.2.14 Verification of Performance
During the first 1-2 years of operation, verification testing (specified in SSC-9) is strongly
recommended, along with a maintenance program that results in achieving expected performance
levels. Operating and maintaining groundwater monitoring wells (specified in Section 2.2.10 - Site
Suitability Criteria) is also strongly encouraged.
2.2.15 Infiltration Basins
This section covers design and maintenance criteria specific for infiltration basins. See schematic in
Figure III-2-4.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 348
Description
Infiltration basins are earthen impoundments used for the collection, temporary storage and
infiltration of incoming stormwater runoff.
Design Criteria Specific for Basins
The finished floor elevation for buildings shall be a minimum of one foot (1’) above the maximum high
water elevation.
Access should be provided for vehicles to easily maintain the forebay (presettling basin) area and not
disturb vegetation, or resuspend sediment any more than is absolutely necessary.
The slope of the basin bottom should not exceed 3% in any direction.
A minimum of one foot of freeboard is recommended when establishing the design ponded water
depth. Freeboard is measured from the rim of the infiltration facility to the maximum ponding level or
from the rim down to the overflow point if overflow or a spillway is included.
Erosion protection of inflow points to the basin must also be provided (e.g., riprap, flow spreaders,
energy dissipators (See Volume III, Chapter 3). Select suitable vegetative materials for the basin floor
and side slopes to be stabilized. Refer to Volume V, Chapter 7 for recommended vegetation.
Lining material – Basins can be open or covered with a 6 to 12-inch layer of filter material such as
coarse sand, or a suitable filter fabric to help prevent the buildup of impervious deposits on the soil
surface. A nonwoven geotextile should be selected that will function sufficiently without plugging (see
geotextile specifications in Appendix C of Volume V). The filter layer can be replaced or cleaned
when/if it becomes clogged.
Vegetation – The embankment, emergency spillways, spoil and borrow areas, and other disturbed
areas should be stabilized and planted, preferably with grass, in accordance with Stormwater Site
Plan (See Minimum Requirement #1 of Volume I). Without healthy vegetation the surface soil pores
would quickly plug.
Refer to Section 2.3.1.2 for additional design criteria.
Maintenance Criteria for Basins
Maintain basin floor and side slopes to promote dense turf with extensive root growth. This enhances
infiltration, prevents erosion and consequent sedimentation of the basin floor, and prevents invasive
weed growth. Bare spots are to be immediately stabilized and revegetated.
Do not allow vegetation growth to exceed 18 inches in height. Mow the slopes periodically and check
for clogging, and erosion. Remove all clippings.
Seed mixtures should be the same as those recommended in Table II-3-3 (Volume II, Chapter 3).
The use of slow-growing, stoloniferous grasses will permit long intervals between mowing. Mowing
twice a year is generally satisfactory. Fertilizers shall not be applied.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 349
2.2.16 Infiltration Trenches
This section covers design, construction and maintenance criteria specific to infiltration trenches.
2.2.16.1 Description:
Infiltration trenches are generally at least 24 inches wide, and are backfilled with a coarse stone
aggregate, allowing for temporary storage of stormwater runoff in the voids of the aggregate material.
Stored runoff then gradually infiltrates into the surrounding soil. The surface of the trench can be
covered with grating and/or consist of stone, gabion, sand, or a grassed covered area with a surface
inlet. Perforated rigid pipe of at least 8-inch diameter can also be used to distribute the stormwater in
a stone trench. Perforated pipes used in conjunction with infiltration systems shall be installed with
the perforated holes facing downward toward the bottom of the trench.
2.2.16.2 Design Criteria
Due to accessibility and maintenance limitations, infiltration trenches must be carefully designed and
constructed.
Infiltration systems shall be located outside of parking and driving areas, unless otherwise approved
by the City.
Catch basins shall be provided on each end of the infiltration trench. Access to these catch basins is
required for maintenance and operation. Infiltration trenches and galleries shall be designed such that
no point in the facility is located more than fifty feet (50’) from an access structure.
Backfill Material - The aggregate material for the infiltration trench shall consist of a clean aggregate
with a maximum diameter of 3 inches and a minimum diameter of 1.5 inches. Void space for these
aggregates shall be in the range of 30 to 40 percent.
Geotextile fabric liner - The aggregate fill material shall be completely encased in an engineering
geotextile material. Geotextile should surround all of the aggregate fill material except for the top one-
foot, which is placed over the geotextile. Geotextile fabric with acceptable properties must be
carefully selected to avoid plugging (see Appendix C of Volume V).
The bottom sand or geotextile fabric is optional.
Refer to the Federal Highway Administration Manual “Geosynthetic Design and Construction
Guidelines,” Publication No. FHWA HI-95-038, May 1995 for design guidance on geotextiles in
drainage applications. Refer to the NCHRP Report 367, “Long-Term Performance of Geosynthetics
in Drainage Applications,” 1994, for long-term performance data and background on the potential for
geotextiles to clog, blind, or to allow piping to occur and how to design for these issues.
Overflow Channel - Because an infiltration trench is generally used for small drainage areas, an
emergency spillway is not necessary. However, a non-erosive overflow channel leading to a
stabilized watercourse should be provided.
Surface Cover - A stone filled trench can be placed under a porous or impervious surface cover to
conserve space.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 350
Observation Well - An observation well should be installed at the lower end of the infiltration trench
to check water levels, drawdown time, sediment accumulation, and conduct water quality monitoring.
Figure III-2-6 illustrates observation well details. It should consist of a perforated PVC pipe which is 4
to 6 inches in diameter and it should be constructed flush with the ground elevation. For larger
trenches a 12-36 inch diameter well can be installed to facilitate maintenance operations such as
pumping out the sediment. The top of the well should be capped to discourage vandalism and
tampering.
Figure III-2-6. Observation Well Details
2.2.16.3 Construction Criteria
Trench Preparation - Excavated materials must be placed away from the trench sides to enhance
trench wall stability. Care should also be taken to keep this material away from slopes, neighboring
property, sidewalks and streets. It is recommended that this material be covered with plastic. (see
Volume II, Chapter 3, BMP C123: Plastic Covering).
Stone Aggregate Placement and Compaction - The stone aggregate should be placed in lifts and
compacted using plate compactors. As a rule of thumb, a maximum loose lift thickness of 12 inches
is recommended. The compaction process ensures geotextile conformity to the excavation sides,
thereby reducing potential piping and geotextile clogging, and settlement problems.
Potential Contamination - Prevent natural or fill soils from intermixing with the stone aggregate. All
contaminated stone aggregate shall be removed and replaced with uncontaminated stone aggregate.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 351
Overlapping and Covering - Following the stone aggregate placement, the geotextile must be
folded over the stone aggregate to form a 12 inch minimum longitudinal overlap. When overlaps are
required between rolls, the upstream roll should overlap a minimum of 2 feet over the downstream
roll in order to provide a shingled effect.
Voids behind Geotextile - Voids between the geotextile and excavation sides must be avoided.
Removing boulders or other obstacles from the trench walls is one source of such voids. Natural soils
should be placed in these voids at the most convenient time during construction to ensure geotextile
conformity to the excavation sides. Soil piping, geotextile clogging, and possible surface subsidence
will be avoided by this remedial process.
Unstable Excavation Sites - Vertically excavated walls may be difficult to maintain in areas where
the soil moisture is high or where soft or cohesionless soils predominate. Trapezoidal, rather than
rectangular, cross-sections may be needed.
2.2.16.4 Maintenance Criteria
Sediment buildup in the top foot of stone aggregate or the surface inlet should be monitored on the
same schedule as the observation well.
2.3 Detention Facilities
This section presents the methods, criteria, and details for design and analysis of detention facilities.
These facilities provide for the temporary storage of increased surface water runoff resulting from
development pursuant to the performance standards set forth in Minimum Requirement #7 for flow
control (Volume I). Storm detention systems shall be designed such that the storm drainage from
public systems does not discharge into areas of private ownership or private maintenance
responsibility.
There are three primary types of detention facilities described in this section: detention ponds, tanks,
and vaults.
2.3.1 Detention Ponds
The design criteria in this section are for detention ponds. However, many of the criteria also apply to
infiltration ponds (Volume III, Section 2.2 and Volume V), and water quality wetponds and combined
detention/wetponds (Volume V). All detention ponds shall be appropriately and aesthetically located,
designed and planted. Pre-approval of the design concept, including landscaping is required by the
City for all proposed public ponds.
2.3.1.1 Dam Safety for Detention BMPs
Stormwater detention facilities that can impound 10 acre-feet (435,600 cubic feet; 3.26 million
gallons) or more above normal, surrounding grade with the water level at the embankment crest are
subject to Ecology’s dam safety requirements, even if water storage is intermittent and infrequent
(WAC 173-175-020). The principal safety concern is for the downstream population at risk if the dam
should breach and allow an uncontrolled release of the pond contents. Peak flows from dam failures
are typically much larger than the 100-year flows which these ponds are typically designed to
accommodate. The Applicant shall contact Ecology’s Dam Safety Engineers at Ecology
Headquarters if any of these conditions are met.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 352
2.3.1.2 Design Criteria
Standard details for detention ponds are provided in Figure III-2-7 through Figure III-2-10 and Table
III-2-10. Control structure discussion and details are provided in Section 2.3.4.
General
Ponds must be designed as flow-through systems (however, parking lot storage may
utilize a back-up system; see Section 2.3.5). Developed flows must enter through a
conveyance system separate from the control structure and outflow conveyance
system. Maximizing distance between the inlet and outlet is encouraged to promote
sedimentation.
Pond bottoms shall be level and be located a minimum of 0.5 feet below the inlet and
outlet to provide sediment storage.
Design criteria for outflow control structures are specified in Section 2.3.4.
A geotechnical analysis and report must be prepared for slopes 20% or greater, or if
located within 200 feet of the top of a slope 20% or greater or landslide hazard area.
The scope of the geotechnical report shall include the assessment of impoundment
seepage on the stability of the natural slope where the facility will be located within
the setback limits set forth in this section.
Detention ponds should be designed using rounded shapes and variations in slopes
to provide a more natural and aesthetically pleasing facility.
The total maximum depth of the detention pond from the bottom to the emergency
overflow water surface elevation shall be fifteen feet (15’).
Side Slopes
Interior side slopes above any wetpond surfaces, if present, shall not be steeper than
3H:1V unless an analysis is provided by a geotechnical engineer, demonstrating
that steeper slopes will be stable. The analysis shall include, at a minimum, an
assessment of the existing soil types, soil properties, groundwater conditions,
potential for seepage, and stability of proposed slopes. The geotechnical analysis
should also provide recommendations to ensure stability both during construction
and in perpetuity.
Exterior side slopes must not be steeper than 2H:1V unless analyzed for stability by
a geotechnical engineer.
A 10 foot level bench is required around the perimeter of the top of ponds to
separate the pond facility from adjacent slopes.
For maintenance and aesthetic reasons, pond designs should minimize structural
elements such as retaining walls. For ponds where retaining walls are required, they
should be limited to a maximum of three sides.
Pond walls may be vertical retaining walls, provided:
o They are constructed of minimum 3,000 psi structural reinforced concrete.
o A fence is provided along the top of the wall.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 353
o At least 25% of the pond perimeter shall be a vegetated soil slope not steeper
than 3H:1V.
o Access for maintenance per this section shall be provided.
o The design is stamped by a licensed civil engineer with structural expertise.
Other retaining walls such as rockeries, concrete, masonry unit walls, and keystone type walls may
be used if designed by a geotechnical engineer or civil engineer with structural expertise. If the entire
pond perimeter is to be retaining walls, ladders shall be provided on the walls for safety reasons.
Figure III-2-7. Typical Detention Pond
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 354
Figure III-2-8. Typical Detention Pond Sections
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 355
Figure III-2-9. Overflow Structure
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 356
Embankments
• Pond berm embankments higher than 6 feet must be designed by a professional
engineer with geotechnical expertise.
• For berm embankments 6 feet or less in height, the minimum top width shall be 6
feet or as recommended by a geotechnical engineer.
• Pond berm embankments must be constructed on native consolidated soil (or
adequately compacted and stable fill soils analyzed by a geotechnical engineer) free
of loose surface soil materials, roots, and other organic debris.
• Pond berm embankments greater than 4 feet in height must be constructed by
excavating a key equal to 50 percent of the berm embankment cross-sectional height
and width unless specified otherwise by a geotechnical engineer. Embankment
compaction should be accomplished in such a manner as to produce a dense, low
permeability engineered fill that can tolerate post-construction settlements with a
minimum of cracking. The embankment fill shall be placed on a stable subgrade and
compacted to a minimum of 95% of the Standard Proctor Maximum Density, ASTM
Procedure D698. Placement moisture content should lie within 1% dry to 3% wet of
the optimum moisture content.
• The berm embankment shall be constructed of soils with the following minimum
characteristics per the United States Department of Agriculture’s Textural Triangle: a
minimum of 20% silt and clay, a maximum of 60% sand, a maximum of 60% silt, with
nominal gravel and cobble content.
• Anti-seepage filter-drain diaphragms must be placed on outflow pipes in berm
embankments impounding water with depths greater than 8 feet at the design water
surface. See Dam Safety Guidelines, Part IV, Section 3.3.B. An electronic version of
Dam Safety Guidelines is available in PDF format at
www.ecy.wa.gov/programs/wr/dams/dss.html
Overflow
• In all ponds, tanks, and vaults, a primary overflow (usually a riser pipe within the
control structure; see Section 2.3.4) shall be provided to bypass the 100-year
developed peak flow over or around the restrictor system. The design must provide
controlled discharge directly into the downstream conveyance system.
• A secondary inlet to the control structure shall be provided in ponds as additional
protection against overtopping should the inlet pipe to the control structure become
plugged. A grated opening (“jailhouse window”) in the control structure manhole
functions as a weir (see Figure III-2-8) when used as a secondary inlet.
The maximum circumferential length of this opening must not exceed one-half the control
structure circumference.
The “birdcage” overflow structure as shown in Figure III-2-9 may also be used as a
secondary inlet.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 357
Emergency Overflow Spillway
In addition to the above overflow provisions, ponds shall have an emergency
overflow spillway. For impoundments of 10 acre-feet or greater, the emergency
overflow spillway must meet the state’s dam safety requirements (see above). For
impoundments less than 10 acre-feet, ponds must have an emergency overflow
spillway that is sized to pass the 100-year developed peak flow. Emergency overflow
spillways shall control the location of pond overtopping such that flow is directed into
the downstream conveyance system or public right of way.
As an option for ponds with berms less than 2 feet in height and located at grades
less than 5 percent, emergency overflow may be provided by an emergency overflow
structure, such as a Type II manhole fitted with a birdcage as shown in Figure III-2-9.
The emergency overflow structure must be designed to pass the 100-year developed
peak flow, with a minimum of 6 inches of freeboard, directly to the downstream
conveyance system or another acceptable discharge point.
The emergency overflow spillway shall be armored with riprap in conformance with
the “Outlet Protection” BMP in Volume II (BMP C209). The spillway must be armored
full width, beginning at a point midway across the berm embankment and extending
downstream to where emergency overflows re-enter the conveyance system (See
Figure III-2-8).
Emergency overflow spillway designs must be analyzed as broad-crested trapezoidal
weirs as described in Methods of Analysis at the end of this section. Either one of the
weir sections shown in Figure III-2-8 may be used.
Access
The following access shall be provided.
Maintenance access road(s) shall be provided to the control structure and other
drainage structures associated with the pond (e.g., inlet or bypass structures).
An access ramp is required for pond cleaning and maintenance. The ramp must
extend to the pond bottom with a maximum slope of 7H:1V (see access road criteria
below).
The internal berm of a wetpond or combined detention and wetpond may be used for
access if it is designed to support a loaded 80,000 pound truck considering the berm is
normally submerged and saturated.
For combined detention and wetpond facilities, a 5 foot level bench area is required
around the perimeter a minimum of 1 foot, but no more than 3 feet, above the
wetpond surface elevation.
Where a portion of the pond is constructed within a fill slope, an access road shall be
provided adjacent to the detention pond along the entire length of the fill.
Access roads/ramps must meet the following requirements:
o Access roads may be constructed with an asphalt or gravel surface, or
modular grid pavement.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 358
o Maximum grade shall be 7H:1V percent.
o Outside turning radius shall be a minimum of 50 feet.
o Fence gates shall be located only on straight sections of road.
o Access roads shall be 15 feet in width.
o A driveway meeting City design standards must be provided where access
roads connect to paved public roadways.
If a fence is required, access shall be limited by a double-posted gate. If a fence is
not required, access shall be limited by two fixed bollards on each side of the access
road and two removable bollards equally located between the fixed bollards.
Additional easements or modification to proposed lot boundaries may be required to
provide adequate access to detention facilities. Right-of-way may be needed for
detention pond maintenance. Any tract not abutting public right-of-way shall have a
15-foot wide extension of the tract to an acceptable access location.
Fencing
A fence is required when a pond interior side slope is steeper than 3H:1V, or when
the wetpond depth is greater than 24 inches. Fencing is required for all vertical walls.
Fencing is required if more than 10 percent of slopes are steeper 3H:1V.
Also note that detention ponds on school sites shall comply with safety standards developed
by the Department of Health (DOH) and the Superintendent for Public Instruction (SPI).
These standards include what is called a ‘non-climbable fence.’
Fences shall be 42 inches in height (see WSDOT Standard Plan L-2, Type 1 chain
link fence).
Access gates shall be 16 feet in width consisting of two swinging sections 8 feet in
width.
Vertical metal balusters or 9 gauge galvanized steel fabric with bonded black vinyl
coating shall be used as fence material with the following aesthetic features:
o All posts, cross bars, and gates shall be painted or coated black.
o Fence posts and rails shall conform to WSDOT Standard Plan L-2 for Types
1, 3, or 4 chain link fence.
For metal baluster fences, Uniform Building Code standards apply.
Wood fences may be used in residential areas where the fence will be maintained by
homeowners associations or adjacent lot owners.
Wood fences shall have pressure treated posts (ground contact rated) either set in
24-inch deep concrete footings or attached to footings by galvanized brackets. Rails
and fence boards may be cedar, pressure-treated fir, or hemlock.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 359
Signage
Detention ponds, infiltration ponds, wetponds, and combined ponds in residential subdivisions shall
have a sign placed for maximum visibility from adjacent streets, sidewalks, and paths. An example
and specifications for a permanent surface water control pond are provided in Figure III-2-10 and
Table III-2-10.
Figure III-2-10. Examples of Permanent Surface Water Control Pond Sign
Table III-2-10. Permanent Surface Water Control Pond Sign Specifications
Size 48 inches by 24 inches
Material 0.125 gauge aluminum
Face Non-reflective vinyl or 3 coats outdoor enamel (sprayed)
Lettering Silk-screen enamel where possible, or vinyl letters
Colors Per City specifications where required
Type Face Helvetica condensed. Title: 3 inch; Sub-Title: 1-1/2 inch; Text: 1 inch;
Border Outer 1/8-inch border distance from edge: 1/4 inch
All text shall be at least 1-3/4 inches from border.
Installation Secure to chain link fence if available. Otherwise install on two posts as described below.
Top of sign no higher than 42 inches from ground surface.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 360
Posts Pressure-treated 4” x 4”; beveled tops 1-1/2 inches higher than the top of the sign; mounted
atop gravel bed, installed in 30-inch concrete-filled post holes (8-inch minimum diameter)
Placement Face sign in direction of primary visual or physical access. Do not block any access road.
Do not place within 6 feet of structural facilities (e.g. manholes, spillways, pipe inlets).
Special Notes This facility is lined to protect groundwater (if a liner restricting infiltration of stormwater is
used).
Setbacks
The City requires specific setbacks for sites with steep slopes, landslide areas, open water features,
springs, wells, and septic tank drain fields. Adequate room for maintenance access and equipment
shall also be considered. Project proponents should consult the Auburn City Codes to determine all
applicable setback requirements. Where a conflict occurs between setbacks, the most stringent of
the setback requirements applies.
Setbacks shall be as follows:
Stormwater ponds shall be set back at least 100 feet from drinking water wells, septic
tanks or drainfields, and springs used for public drinking water supplies.
Infiltration facilities upgradient of drinking water supplies and within 1, 5, and 10-year
time of travel zones must comply with Health Dept. requirements (Washington
Wellhead Protection Program, DOH Publication # 331-018). Additional setbacks for
infiltration facilities may be required per DOH publication #333-117, On-Site Sewage
Systems Chapter 246-272A WAC.
The 100-year water surface elevation shall be at least 10 feet from any structure or
property line. If necessary, setbacks shall be increased from the minimum 10 feet in
order to maintain a 1H:1V side slope for future excavation and maintenance. Vertical
pond walls may necessitate an increase in setbacks.
All pond systems shall be setback from sensitive areas, steep slopes, landslide hazard
areas, and erosion hazard areas as governed by the Auburn City Code. Facilities near
landslide hazard areas must be evaluated by a geotechnical engineer or qualified
geologist. The discharge point shall not be placed on or above slopes 20% (5H:1V) or
greater, or above erosion hazard areas without evaluation by a geotechnical engineer
or qualified geologist and City approval.
For sites with septic systems, ponds shall be downgradient of the drainfield unless the
site topography clearly prohibits subsurface flows from intersecting the drainfield.
Seeps and Springs
Intermittent seeps along cut slopes are typically fed by a shallow groundwater source (interflow)
flowing along a relatively impermeable soil stratum. These flows are storm driven. However, more
continuous seeps and springs, which extend through longer dry periods, are likely from a deeper
groundwater source. When continuous flows are intercepted and directed through flow control
facilities, adjustments to the facility design shall be made to account for the additional base flow. Flow
monitoring of intercepted flow may be required for design purposes.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 361
Planting Requirements
Exposed earth on the pond bottom and interior side slopes shall be sodded or seeded with an
appropriate seed mixture. All remaining areas of the tract shall be planted with grass or be
landscaped and mulched with a 4-inch cover of hog fuel or shredded wood mulch. Shredded wood
mulch is made from shredded tree trimmings, usually from trees cleared on site. The mulch should
be free of garbage and weeds and should not contain excessive resin, tannin, or other material
detrimental to plant growth. Multiple plantings and mulching may be required until vegetation has
established itself. A bond may be required to guarantee vegetation stabilization for detention facilities.
Landscaping
Public and private storm drainage facilities should enhance natural appearances, protect significant
cultural and natural resources, and be appropriate to the use of the site and the surrounding area.
Landscaping shall be designed to screen the storm drainage facilities and create a natural-appearing
setting while not adversely impacting the function and maintenance of the storm drainage facilities. A
Landscape Plan with the Stormwater Site Plan is required for City review and approval.
Landscaping is required for all stormwater tract areas (see below for areas not to be landscaped).
Landscaped stormwater tracts may, in some instances, provide a recreational space. In other
instances, “naturalistic” stormwater facilities may be placed in open space tracts.
The following criteria shall be incorporated when designing landscaping for storm drainage facilities.
Identify the type of landscaping and screening appropriate to the site taking into
account zoning and proposed use. Landscaping and screening requirements are
described in Auburn City Code (ACC) Title 18. The purpose of each type is to reflect
the level of landscaping and screening density needed to maintain compatibility with
the character of the neighborhood.
An effort should be made to retain all significant trees on site, evergreens six inches
(6”) or greater in diameter, or any deciduous tree four inches (4”) in diameter or greater
as defined in ACC Title 18. Diameter measurements are taken at four feet (4’) above
grade elevation. Authorization by the City is required for removal of any significant
trees.
Identify the soil type and hydrological regime or each portion of the storm drainage
facility to determine appropriate site criteria for plant selection.
Select tree and shrub species from the Plant Selection Guide contained herein. Plant
choices must reflect the functional and aesthetic needs of the site. Fall planting is
recommended for optimal acclimation and survivability. An irrigation system will be
required for public ponds to insure plant establishment. Irrigation systems may also be
needed for private ponds if plantings are done in the spring/summer or in times of
limited precipitation, unless other watering provisions are established.
Plant choices are not restricted to those listed in the Plant Selection Guide, but plant
selection must be based on ease of maintenance, appropriateness to the use of the
site (commercial, residential, or industrial), and survivability. Plant selection should
correspond with street tree requirements and neighborhood character as appropriate.
Selections are to be approved by the City during the review process. NOTE: Plants
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 362
identified in the Guide are predominately native and reflect the soil conditions and
water regimes of the area.
Develop a Landscape Plan to scale identifying the location and species of existing
trees and the location and schedule of species, quantity and size of all proposed tree,
shrubs, and ground covers. Drawings should be scaled at 1”=10’ or 1”=20’ to optimally
relay information on the plant location and placement. Construction specifications
should indicate appropriate soil amendments where necessary and planting
specifications as recommended by the American Standards for Nursery Stock and the
American National Standards Institute (ANSI).
Excluding access points, a minimum of ten feet (10’) width of Type-III landscaping in
accordance with Auburn City Code 18.50 shall be provided around the exterior length
of the pond. This width may be reduced to five feet (5’) if the interior side slopes of the
pond are landscaped.
No tree and shrub planting is allowed with pipeline easements, traveled surfaces, or
over underground utilities.
No trees or shrubs shall be planted within 10 feet of inlet or outlet pipes or manmade
drainage structures such as spillways or flow spreaders. Species with roots that seek
water, such as willow or poplar, shall be avoided within 50 feet of pipes or manmade
structures.
Planting shall be restricted on berms that impound water either permanently or
temporarily during storms. This restriction does not apply to cut slopes that form pond
banks, only to berms.
o Trees or shrubs may not be planted on portions of water-impounding berms
taller than four feet high. Only grasses may be planted on berms taller than
four feet.
Grasses allow unobstructed visibility of berm slopes for detecting potential dam safety
problems, such as animal burrows, slumping, or fractures in the berm.
o Trees planted on portions of water-impounding berms less than 4 feet high
must be small, not higher than 20 feet mature height, and must have a fibrous
root system. Table III-2-11 gives some examples of trees with these
characteristics developed for the Central Puget Sound.
NOTE: The internal berm in a wetpond is not subject to this planting restriction since the
failure of an internal berm would be unlikely to create a safety problem.
All landscape material, including grass, shall be planted in topsoil. Native underlying
soils may be made suitable for planting if amended with 4 inches of compost tilled
into the subgrade. Compost used should meet specifications for Grade A compost
quality. See http://www.ecy.wa.gov/programs/swfa/compost/
For a naturalistic effect as well as ease of maintenance, trees of shrubs shall be
planted in clumps to form “landscape islands” rather than planting evenly spaced.
The landscaped islands shall be a minimum of six feet apart, and if set back from
fences or other barriers, the setback distance should also be a minimum of 6 feet.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 363
Where tree foliage extends low to the ground, the 6 feet setback should be counted
from the outer drip line of the trees (estimated at maturity).
This setback allows a 6-foot wide mower to pass around and between clumps.
Evergreen trees and trees which produce relatively little leaf-fall (such as Oregon ash,
mimosa, or locust) are preferred in areas draining to the pond.
Trees should be set back so that branches do not extend over the pond (to prevent
deposition of leaves into the pond).
Drought tolerant species are recommended.
The following lists contain the suggested trees, plants and grasses to be used in landscaping storm
drainage facilities. The trees and plants listed are native to the region and should be chosen over
non-native species. The lists shown are not all-inclusive, additional trees and plants may be
acceptable upon approval of the City.
Table III-2-11. Plant Selection Guide
Tree Selection Guide for Storm Drainage Detention/Retention Facilities
Suggested Trees Tolerates Wet to
Saturated Soils
Recommend Moderately
Wet to Dry Soils
Recommend
Dry Soils Botanical Name Common Name
Acer circinatum Vine Maple ♦
Alnus rubra Red Alder ♦
Betula papyrifera Paper Birch ♦
Corylus cornuta Hazelnut ♦
Crataegus douglasii Black Hawthorn ♦
Fraxinus latifolia Oregon Ash ♦
Picea sitchensis Sitka Spruce ♦
Pinus contorta Shore Pine ♦
Pinus monticula Western White Pine ♦
Populus tremuloides Quaking Aspen ♦
Prunus virginiana Choke Cherry ♦
Pseudotsuga menziesii Douglas Fir ♦
Salix lasiandra Pacific Willow ♦
Salix scouleriana Scouler Willow ♦
Salix sitchensis Sitka Willow ♦
Thuja pljcata Western Red Cedar ♦
Tsuga heterophylla Western Hemlock ♦
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 364
Shrub Selection Guide for Storm Drainage Detention/Retention Facilities
Suggested Shrubs Tolerates Wet to
Saturated Soils
Recommend Moderately
Wet to Dry Soils
Recommend
Dry Soils Botanical Name Common Name
Amelanchier alnifolia Serviceberry ♦
Cornus sericea Red Osier Dogwood ♦
Gaultheria shallon Salal ♦
Holidiscus discolor Ocean Spray ♦
Lonicera involucrata Black Twinberry ♦
Mahonia aquifolium Tall Oregon Grape ♦
Mahonia repens Low Oregon Grape ♦
Oemleria cerasiformis Indian Plum ♦
Physocarpus capitatus Pacific Ninebark ♦
Ribes sanguineum Red Flowering Currant ♦
Rosa nutkana Nootka Rose ♦
Rosa rugosa Rugosa Rose ♦
Rubus spectabilis Salmonberry ♦
Rubus spectabilis Thimbleberry ♦
Sambucus racemosa Red Elderberry ♦
Symphoricarpos albus Snowberry ♦
Vaccinium ovatum Evergreen Huckleberry ♦
Vaccinium parviflorum Red Huckleberry ♦
Perennial Groundcover Selection Guide for Storm Drainage Detention/Retention Facilities
Suggested Perennial Groundcover Tolerates Wet
to Saturated
Soils
Recommend Moderately
Wet to Dry Soils
Recommend
Dry Soils Botanical Name Common Name
Athyrium filix-femina Lady Fern ♦
Dicentra formosa Bleeding Heart ♦
Polystichum munitum Sword Fern ♦
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 365
Aquatic/Emergent Wetland Selection Guide for Storm Drainage Detention/Retention Facilities
Suggested Aquatics/Emergent Wetland Plants
Botanical Name Common Name
Tolerates Open Water (3’ + Depth) to
Shallow Standing Water (<1’ Depth)
Potamogeton natans Floating Pondweed
Lotus conicalitatus Birdsfoot Trefoil
Nymphaea odorata American Water Lily
Lemna minor Common Duckweed
Polygonum punctatum Dotted Smartweed
Polygonum amphibium Water Smartweed
Oenanthe sarmentosa Water Parsley
Alisma plantago-aquitica American Waterplantain
Sparganium spp. Bur-reed
Sagittaria spp. Arrowhead
Scirpus acutus Hardstem Bulrush
Scirpus microcarpus Small-fruited Bulrush
Carex obnupta Slough Sedge
Carex languinosa Wooly Sedge
Eleocharis spp. Spike Rush
Carex spp. Sedge
Tolmiea menziesii Piggy back plant
Hordcum brachyantherum Meadow Barley
Grass Seed Mixes for Detention/Retention Facilities
Moisture Condition By Weight Species Common Name Percent
Very Moist Agrosotis tenuis Colonial Bentgrass 50
Festuca ruba Red Fescue 10
Alopocuris pratensis Meadow Foxtail 40
Moist Festuca arundinacea Meadow Fescue 70
Agrosotis tenuis Colonial Bentgrass 15
Alopecurus pratensis Meadow Foxtail 10
Trifoluim hybridum White Clover 5
Moist-Dry Agrosotis tenuis Colonial Bentgrass 10
Festuca ruba Red Fescue 40
Lolium multiflorum Annual Ryegrass 40
Trifolium repens White Clover 10
Application rates: Hydroseed @ 60 lbs/acre Handseed @ 2 lbs/1000 square feet
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 366
Maintenance
A maintenance plan shall be prepared for all surface water management facilities. See Volume I,
Appendix D for specific maintenance requirements.
All private drainage systems serving multiple lots shall require a signed Stormwater Maintenance
and Access agreement with the City. The agreement shall designate the systems to be maintained
and the parties responsible for maintenance. Contact the City to determine the applicability of this
requirement to a project.
Any standing water removed during the maintenance operation must be disposed of in a City
approved manner. See the dewatering requirements in Volume II of this manual. Pretreatment may
be necessary. Residuals must be disposed in accordance with state and local solid waste regulations
(See Minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC).
2.3.1.3 Methods of Analysis
Detention Volume and Outflow
The volume and outflow design for detention ponds must be in accordance with Minimum
Requirements # 7 in Volume I and the hydrologic analysis and design methods in Chapter 1 of this
Volume. Design guidelines for restrictor orifice structures are given in Section 2.3.4.
The design water surface elevation is the highest elevation which occurs in order to meet the
required outflow performance for the pond.
Detention Ponds in Infiltrative Soils
Detention ponds may occasionally be sited on till soils that are sufficiently permeable for a properly
functioning infiltration system (see Section 2.2). These detention ponds have a surface discharge and
may also utilize infiltration as a second pond outflow. Detention ponds sized with infiltration as a
second outflow must meet all the requirements of Section 2.2 for infiltration ponds, including a soils
report, testing, groundwater protection, pre-settling, and construction techniques.
Emergency Overflow Spillway Capacity
For impoundments under 10-acre-feet, or ponds not subject to dam safety requirements, the
emergency overflow spillway weir section must be designed to pass the 100-year runoff event for
developed conditions assuming a broad-crested weir. The broad-crested weir equation for the
spillway section in Figure III-2-11, for example, would be:
Ql00 = C (2g) 1/2 [3
2 LH3/2 + 15
8 (Tan ) H5/2 ] (equation 1)
Where Ql00 = peak flow for the 100-year runoff event (cfs)
C = discharge coefficient (0.6)
g = gravity (32.2 ft/sec2)
L = length of weir (ft)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 367
H = height of water over weir (ft)
= angle of side slopes (degrees)
NOTE: Q100 is either the peak 10-minute flow computed from the 100-year, 24-hour storm and a
Type 1A distribution, or the 100-year, 1-hour flow, indicated by an approved continuous runoff model,
multiplied by a factor of 1.6
Assuming C = 0.6 and Tan = 3 (for 3:1 slopes), the equation becomes:
Ql00 = 3.21[LH3/2 + 2.4 H5/2 ] (equation 2)
To find width L for the weir section, the equation is rearranged to use the computed Ql00 and trial
values of H (0.2 feet minimum):
L = [Ql00/(3.21H3/2)] - 2.4 H or 6 feet minimum (equation 3)
Figure 3-19 Weir Section for Emergency Overflow Spillway
“Outlet Protection” in Vol. II
0.7 ft. min
0.5 ft. min
per “Outlet Protection” in Volume 2
overflow
water
surface
emergency overflow
water surface
0.2 ft. min
Figure III-2-11. Weir Section for Emergency Overflow Spillway
2.3.2 Detention Tanks
Detention tanks are underground storage facilities typically constructed with large diameter pipe.
Standard detention tank details are shown in Figure III-2-12 and Figure III-2-13. Control structure
details are shown in Section 2.3.4.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 368
Figure III-2-12. Typical Detention Tank
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 369
Notes:
1. Use adjusting blocks as required to bring frame to grade.
2. All materials to be aluminum or galvanized and asphalt coated (Treatment 1 or
better).
3. Must be located for access by maintenance vehicles.
4. May substituteWSDOT special Type IV manhole (RCP only).
Figure III-2-13. Detention Tank Access Detail
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 370
2.3.2.1 Design Criteria
General
• Tanks shall be designed as flow-through systems with manholes in line (see Figure
III-2-12) to promote sediment removal and facilitate maintenance. Tanks shall also
be designed to allow stormwater to back-up into the system if the tank is preceded
by water quality facilities.
• The detention tank bottom shall be located 6 inches below the inlet and outlet to
provide dead storage for sediment. If arch pipe is used, the minimum dead storage is
0.5 feet.
• The minimum pipe diameter for a detention tank is 36 inches.
• The minimum thickness for CMP shall be 12-gauge.
• Tanks larger than 36 inches may be connected to each adjoining structure with a
short section (2-foot maximum length) of 35-inch minimum diameter pipe. These
sections shall not be considered as access when determining required access
points.
• Details of outflow control structures are given in Section 2.3.4.
Materials
See City of Auburn Construction Standards Section 9.05.
Structural Stability
Tanks must meet structural requirements for overburden support and traffic loading if appropriate.
H-20 live loads shall be accommodated for tanks lying under parking areas and access roads. Metal
tank end plates shall be designed for structural stability at maximum hydrostatic loading conditions.
Tanks shall not be placed in fill slopes, unless analyzed in a geotechnical report for stability and
constructability.
Buoyancy
Buoyancy calculations shall be required where groundwater may induce flotation. Engineers are
required to address this issue in project design documentation.
Access
The following requirements for access shall be met along with those stipulated in Section 2.3.1.
• The maximum depth from finished grade to tank invert shall be 20 feet.
• Access openings shall be positioned a maximum of 50 feet from any location within
the tank. A minimum of one access opening per tank shall be provided.
• All tank access openings shall have round, solid locking lids (usually 1/2 to 5/8-inch
diameter Allen-head cap screws).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 371
• Thirty-six inch minimum diameter CMP riser-type manholes (see Figure III-2-13) of
the same gauge as the tank material may be used for access along the length of the
tank and at the upstream terminus of the tank in a backup system. The top slab is
separated (1-inch minimum gap) from the top of the riser to allow for deflections from
vehicle loadings without damaging the riser tank.
• All tank access openings must be readily accessible to maintenance vehicles.
• Tanks must comply with the OSHA confined space requirements, which include
clearly marking entrances to confined space areas. This may be accomplished by
hanging a removable sign in the access riser(s) just under the access lid.
Access Roads
Access roads are needed to all detention tanks, control structures, and risers. The access roads
must be designed and constructed as specified for detention ponds in Section 2.3.1.
Setbacks
For setback requirements see Section 2.3.1.
Maintenance
Provisions to facilitate maintenance operations must be built into the project when it is installed.
Maintenance must be a basic consideration in design and in determination of first cost. See Volume I,
Appendix D for specific maintenance requirements.
Methods of Analysis
Detention Volume and Outflow
The volume and outflow design for detention tanks must be in accordance with Minimum
Requirement # 7 in Volume I and the hydrologic analysis and design methods in Volume III,
Chapter 1. Restrictor and orifice design are given in Section 2.3.4.
2.3.3 Detention Vaults
Detention vaults are box-shaped underground storage facilities typically constructed with reinforced
concrete. A standard detention vault detail is shown in Figure III-2-14. Control structure details are
shown in Section 2.3.4. A detention vault may be used for commercial, industrial, or roadway projects
when there are space limitations precluding the use of aboveground storage options. Vaults are box-
shaped underground storage facilities typically constructed with reinforced concrete. The use of
public vaults for residential development is discouraged. A design of a detention vault may be
modified into a wetvault to provide stormwater quality (see Volume V 8.2.2)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 372
Figure III-2-14. Typical Detention Vault
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 373
2.3.3.1 Design Criteria
General
• Detention vaults shall be designed as flow-through systems with bottoms level
(longitudinally) or sloped toward the inlet to facilitate sediment removal. Distance
between the inlet and outlet should be maximized (as feasible).
• The detention vault bottom shall slope at least 5 percent from each side towards the
center, forming a broad “v” to facilitate sediment removal. More than one “v” may be
used to minimize vault dept. The vault bottom may be flat with 0.5 – 1 foot of
sediment storage if removable panels are provided over the entire vault. It is
recommended that the removable panels be at grade, have stainless steel lifting
eyes, and weigh no more than 5 tons per panel.
• The invert elevation of the outlet shall be elevated above the bottom of the vault to
provide an average 6 inches of sediment storage over the entire bottom. The outlet
shall also be elevated a minimum of 2 feet above the orifice to retain oil within the
vault.
• Details of outflow control structures are given in Section 2.3.4.
Buoyancy
A buoyancy analysis is required to demonstrate that the vault will not be impacted by ground water.
Materials
Minimum 3,000 psi structural reinforced concrete may be used for detention vaults. All construction
joints must be provided with water stops.
Structural Stability
All vaults must meet structural requirements for overburden support and H-20 traffic loading (See
Standard Specifications for Highway Bridges, 1998 Interim Revisions, American Association of State
Highway and Transportation Officials). Vaults located under roadways must meet live load
requirements of the City. Cast-in-place wall sections must be designed as retaining walls. Structural
designs for cast-in-place vaults must be stamped by a licensed civil engineer with structural
expertise. Vaults must be placed on stable, well-consolidated native material with suitable bedding.
Vaults must not be placed in fill slopes, unless analyzed in a geotechnical report for stability and
constructability.
Access
Access must be provided over the inlet pipe and outlet structure. The following guidelines for access
shall be used.
• Access openings shall be positioned a maximum of 50 feet from any location within
the vault. Additional access points may be needed on large vaults.
• An access opening shall be provided directly above the lowest point of each “v” in
the vault floor.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 374
• An access opening shall be provided directly above each connection to the vault.
• For vaults with greater than 1,250 square feet of floor area, a 5’ x 10’ removable
panel should be provided over the inlet pipe (instead of a standard frame, grate and
solid cover). Alternatively, a separate access vault may be provided, as shown in
Figure III-2-14.
• For vaults under roadways, the removable panel must be located outside the travel
lanes. Alternatively, multiple standard locking manhole covers may be provided.
• Ladders and hand-holds shall be provided at all access openings, and as needed to
meet OSHA confined space requirements.
• All access openings, except those covered by removable panels, may have round,
solid locking lids, or 3-foot square, locking diamond plate covers.
• Vaults with widths 10 feet or less must have removable lids.
• The maximum depth from finished grade to the vault invert shall be 15 feet.
• Internal structural walls of large vaults should be provided with openings sufficient for
maintenance access between cells. The openings should be sized and situated to
allow access to the maintenance “v” in the fault floor.
• A minimum of two access openings shall be provided into each cell.
• The minimum internal height shall be 7 feet from the highest point of the vault floor
(not sump), and the minimum width shall be 4 feet. However, concrete vaults may be
a minimum 3 feet in height and width if used as a tank with access manholes at each
end, and if the width is no larger than the height. Also the minimum internal height
requirement may not be needed for any areas covered by removable panels.
• Vaults must comply with the OSHA confined space requirements, which include
clearly marking entrances to confined space areas. This may be accomplished by
hanging a removable sign in the access riser(s), just under the access lid.
• Ventilation pipes (minimum 12-inch diameter or equivalent) shall be provided in all
four corners of vaults to allow for artificial ventilation prior to entry of maintenance
personnel into the vault. Alternatively, removable panels over the entire vault, or
manhole access at 12-foot spacing, may be provided.
Access Roads
Access shall be designed and constructed as specified for detention ponds in Section 2.3.1.
Setbacks
For setback requirements see Section 2.3.1.
Maintenance
Provisions to facilitate maintenance operations must be built into the project when it is installed.
Maintenance must be a basic consideration in design and in determination of first cost. See Volume I,
Appendix D for specific maintenance requirements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 375
2.3.3.2 Methods of Analysis
Detention Volume and Outflow
The volume and outflow design for detention vaults must be in accordance with Minimum
Requirement # 7 in Volume I and the hydrologic analysis and design methods in Chapter 1.
Restrictor and orifice design are given in Section 2.3.4.
2.3.4 Control Structures
Control structures are catch basins or manholes with a restrictor device for controlling outflow from a
facility to meet the desired performance.
The restrictor device usually consists of two or more orifices and/or a weir section sized to meet
performance requirements. Standard control structure details are shown in Figure III-2-15 through
Figure III-2-17.
2.3.4.1 Design Criteria
Multiple Orifice Restrictor
In most cases, control structures need only two orifices: one at the bottom and one near the top of
the riser, although additional orifices may best utilize detention storage volume. Several orifices may
be located at the same elevation if necessary to meet performance requirements.
• Minimum orifice diameter is 0.5 inches. In some instances, a 0.5-inch bottom orifice
will be too large to meet target release rates, even with minimal head. In these
cases, do not reduce the live storage depth to less than 3 feet in an attempt to meet
the performance standards. Under such circumstances, flow-throttling devices may
be a feasible option. These devices will throttle flows while maintaining a plug-
resistant opening.
• Orifices may be constructed on a tee section as shown in Figure III-2-15 or on a
baffle as shown in Figure III-2-16.
• In some cases, performance requirements may require the top orifice/elbow to be
located too high on the riser to be physically constructed (e.g. a 13-inch diameter
orifice positioned 0.5 feet from the top of the riser). In these cases, a notch weir in
the riser pipe may be used to meet performance requirements (see Figure III-2-17).
• Backwater effects from water surface elevations in the conveyance system shall be
evaluated. High tailwater elevations may affect performance of the restrictor system
and reduce live storage volumes. Backwater effects shall also be analyzed for areas
that are influenced by tides.
Riser and Weir Restrictor
• Properly designed weirs may be used as flow restrictors (see Figure III-2-17 and
Figure III-2-19 through Figure III-2-21). However, they must be designed to provide
for primary overflow of the developed 100-year peak flow discharging to the
detention facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 376
• The combined orifice and riser (or weir) overflow may be used to meet performance
requirements. However, the design must still provide for primary overflow of the
developed 100-year peak flow assuming all orifices are plugged. Figure III-2-22 can
be used to calculate the head in feet above a riser of given diameter and flow.
Access
The following guidelines for access shall be used.
• An access road to the control structure is needed for inspection and maintenance,
and must be designed and constructed as specified for detention ponds in
Section 2.3.1.
• Manhole and catch basin lids for control structures must be locking, and rim
elevations must match proposed finish grade.
• Manholes and catch basins must meet the OSHA confined space requirements,
which include clearly marking entrances to confined space areas. This may be
accomplished by hanging a removable sign in the access riser, just under the access
lid.
Information Plate
A brass or stainless steel plate shall be permanently attached inside each control structure with the
following information engraved on the plate:
• Name and file number of project
• Name and company of (1) developer, (2) engineer, and (3) contractor
• Date constructed
• Date of manual used for design
• Outflow performance criteria
• Release mechanism size, type, and invert elevation
• List of stage, discharge, and volume at one-foot increments
• Elevation of overflow
• Recommended frequency of maintenance.
2.3.4.2 Maintenance
Control structures require regular maintenance and cleaning. Maintenance frequency and
procedures shall be addressed in the facility maintenance manual.
Volume I, Appendix D provides maintenance recommendations for control structures and catch
basins.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 377
2.3.4.3 Methods of Analysis
This section presents the methods and equations for design of control structure restrictor devices.
Included are details for the design of orifices, rectangular sharp-crested weirs, v-notch weirs, sutro
weirs, and overflow risers.
Orifices
Flow-through orifice plates in the standard tee section or turn-down elbow may be approximated by
the general equation:
gh2A CQ= (equation 4)
where Q = flow (cfs)
C = coefficient of discharge (0.62 for plate orifice)
A = area of orifice (ft2)
h = hydraulic head (ft)
g = gravity (32.2 ft/sec2)
Figure III-2-18 illustrates this simplified application of the orifice equation.
The diameter of the orifice is calculated from the flow. The orifice equation is often useful when
expressed as the orifice diameter in inches:
h
Qd88.36= (equation 5)
where d = orifice diameter (inches)
Q = flow (cfs)
h = hydraulic head (ft)
Rectangular Sharp-Crested Weir
The rectangular sharp-crested weir design shown in Figure III-2-19 may be analyzed using standard
weir equations for the fully contracted condition.
Q = C (L - 0.2H)H 23 (equation 6)
where Q = flow (cfs)
C = 3.27 + 0.40 H/P (ft)
H, P = as shown in Figure III-2-19
L = length (ft) of the portion of the riser circumference
as necessary not to exceed 50 percent of the circumference
D = inside riser diameter (ft)
NOTE: This equation accounts for side contractions by subtracting 0.1H from L for each side of the
notch weir.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 378
V-Notch Sharp - Crested Weir
V-notch weirs as shown in Figure III-2-20 may be analyzed using standard equations for the fully
contracted condition.
Proportional or Sutro Weir
Sutro weirs are designed so that the discharge is proportional to the total head. This design may be
useful in some cases to meet performance requirements.
The sutro weir consists of a rectangular section joined to a curved portion that provides
proportionality for all heads above the line A-B (see Figure III-2-21). The weir may be symmetrical or
non-symmetrical.
For this type of weir, the curved portion is defined by the following equation (calculated in radians):
a
ZTanb
x 121--= (equation 7)
Where a, b, x and Z are as shown in Figure III-2-14.
The head-discharge relationship is:
)3h(2 b C 1d
agaQ-= (equation 8)
where Q = flow (cfs)
g = gravity
Values of Cd for both symmetrical and non-symmetrical sutro weirs are summarized in Table III-2-12.
When b > 1.50 or a > 0.30, use Cd=0.6.
Riser Overflow
The nomograph in Figure III-2-22 can be used to determine the head (in feet) above a riser of given
diameter and for a given flow (usually the 100-year peak flow for developed conditions).
NOTE: Q100 is either the peak 10-minute flow computed from the 100-year, 24-hour storm and a
Type 1A distribution, or the 100-year, 1-hour flow, indicated by an approved continuous runoff model,
multiplied by a factor of 1.6
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 379
Table III-2-12. Values of Cd for Sutro Weirs
Cd Values, Symmetrical
b (ft)
a (ft)
0.50 0.75 1.0 1.25 1.50
0.02 0.608 0.613 0.617 0.6185 0.619
0.05 0.606 0.611 0.615 0.617 0.6175
0.10 0.603 0.608 0.612 0.6135 0.614
0.15 0.601 0.6055 0.610 0.6115 0.612
0.20 0.599 0.604 0.608 0.6095 0.610
0.25 0.598 0.6025 0.6065 0.608 0.6085
0.30 0.597 0.602 0.606 0.6075 0.608
Cd Values, Non-Symmetrical
b (ft) a (ft)
0.50 0.75 1.0 1.25 1.50
0.02 0.614 0.619 0.623 0.6245 0.625
0.05 0.612 0.617 0.621 0.623 0.6235
0.10 0.609 0.614 0.618 0.6195 0.620
0.15 0.607 0.6115 0.616 0.6175 0.618
0.20 0.605 0.610 0.614 0.6155 0.616
0.25 0.604 0.6085 0.6125 0.614 0.6145
0.30 0.603 0.608 0.612 0.6135 0.614
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 380
Figure III-2-15. Flow Restrictor (TEE)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 381
NOTES:
Outlet capacity: 100 year developed peak flow
Metal parts: corrosion resistant steel parts
galvanized and asphalt coated
Catch basin: Type 2, minimum 72-inch diameter
Orifices: Sized and located as required with
lowest orifice a min. or 2" from base
Figure III-2-16. Flow Restrictor (Baffle)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 382
Spill containment must be provided to temporarily detain oil or floatable pollutants in runoff due to accidental spill
or illegal dumping.
Frames, grates and round solid
covers marked “DRAIN” with
locking bolts
shear gate with
control red for
drain
Figure III-2-17. Flow Restrictor (Weir)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 383
Figure III-2-18. Simple Orifice
Figure III-2-19. Rectangular, Sharp-Crested Weir
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 384
Q = Cd(Tan /2)Y 5/2, in cfs
Y
H
Figure III-2-20. V-Notch, Sharp-Crested Weir
Figure III-2-21. Sutro Weir
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 385
Figure III-2-22. Riser Inflow Curves
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Flow Control Design Volume III
Chapter 2 386
2.3.5 Other Detention Options
This section presents other design options for detaining flows to meet flow control facility
requirements.
Use of Parking Lots for Additional Detention
Private parking lots may be used to provide additional detention volume for runoff events greater than
the 2-year runoff event provided all of the following are met:
• The depth of water detained does not exceed 0.5 feet (6 inches) at any location in
the parking lot for runoff events up to and including the 100-year event.
• The gradient of the parking lot area subject to ponding is 1 percent or greater.
• The emergency overflow path is identified and noted on the engineering plan. The
overflow must not create a significant adverse impact to downhill properties or
drainage system.
• Fire lanes be used for emergency equipment are free of ponding water for all runoff
events up to and including the 100-year event.
• The overflow elevation shall be a minimum of one foot (1’) below the finish floor
elevation of adjacent building, adjacent properties, landscaping and parking stalls.
• At no time shall parking lot ponding encroach on walking paths, sidewalks, or
American Disabilities Act (A.D.A) required parking stalls or adjacent A.D.A. access.
Use of Roofs for Detention
Detention ponding on roofs of structures may be used to meet flow control requirements provided all
of the following are met:
• The roof support structure is analyzed by a structural engineer to address the weight of
ponded water and meets the requirements of the applicable building code.
• The roof area subject to ponding is sufficiently waterproofed to achieve a minimum
service life of 30 years.
• The minimum pitch of the roof area subject to ponding is 1/4-inch per foot.
• An overflow system is included in the design to safely convey the 100-year peak flow
from the roof.
• A mechanism is included in the design to allow the ponding area to be drained for
maintenance purposes, or in the event the restrictor device is plugged.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 387
Chapter 3 Conveyance System Design
and Hydraulic Analysis
This chapter presents acceptable methods for the analysis and design of storm and surface water
conveyance systems. Conveyance systems can be separated into the following categories:
• Pipe systems
• Culverts
• Open Channels (ditches, swales)
• Outfalls
Pipe systems, culverts, and open channels are addressed in Section 3.4. Outfalls are addressed in
Section 3.5.
The purpose of a conveyance system is to drain surface water, up to a specific design flow, from
properties so as to provide protection to property and the environment. This chapter contains detailed
design criteria, methods of analysis and standard details for all components of a conveyance system.
A complete basic understanding of hydrology and hydraulics and the principles on which the
methodology of hydrologic analysis is based is essential for the proper and accurate application of
methods used in designing conveyance systems.
• A minimum of ten (10’) shall be provided between the centerline of the conveyance and any
property line or obstruction that would impede maintenance.
• Where storm drainage is directed against a curb, the curb shall be either a concrete curb and
gutter or concrete vertical curb. An extruded curb or asphalt wedge section in any form will
not be allowed.
3.1 Conveyance System Analysis Requirements
The project engineer shall provide calculations demonstrating the adequacy of all the project’s
existing and proposed surface water conveyance system components. The project engineer shall
provide calculations regarding all off-site flows as required by Volume I. All relevant work/calculations
shall be submitted for City review as part of a permit submittal. Small and/or isolated storm system
(detention and water quality treatment) designs shall address how they will be incorporated into
larger drainage systems likely to be built in the future. For example, site specific frontage and half
street improvement designs shall also use a corridor analysis approach to ensure that they can be
incorporated into larger future storm systems.
3.1.1 On-site Analysis
All proposed on-site surface water conveyance systems shall be sized to meet the required design
event per Section 3.2.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 388
3.1.2 Offsite Analysis (1/4 mile Downstream Analysis)
Refer to Minimum Requirement #10 (Offsite Analysis and Mitigation) in Volume I to determine
whether a downstream analysis is required for a specific project. All projects shall complete a
qualitative downstream analysis. A quantitative analysis shall be required as described in Minimum
Requirement #10.
The engineer must field survey all existing storm drainage systems downstream from the project for a
minimum of ¼ mile from the point of connection to the existing public drainage system, unless a City-
identified trunk-line is encountered. The goal of the inspection and analysis is to evaluate whether the
capacity of the drainage system(s) is adequate to handle the existing flows, flows generated by the
proposed project, and any overflow. Adequacy will be evaluated based on conveyance capacity,
flooding problems, erosion damage or potential, amount of freeboard in channels and pipes, and
storage potential within the system. All existing and proposed off-site surface water conveyance
systems shall be sized to convey flows from the required design storm event per Section 3.2.
The offsite analysis may be stopped shorter than the required ¼-mile downstream if the analysis
reaches a City identified trunk line. Storm drainage pipes greater than or equal to 36 inches in
diameter are generally considered trunk lines. However, where minimal grades (less than 0.5%)
necessitated the use of a larger pipe to maintain flows, the City may not consider a pipe greater than
or equal to 36 inches as a trunk line. Contact the City for final determination of whether a storm
drainage pipe is a trunk line.
If a capacity problem or streambank erosion problem is encountered, the flow durations from the
project will be restricted per Minimum Requirement #7 – Flow Control. The design shall meet the
requirements of Chapter 2 of this volume. For projects that do not meet the thresholds of Minimum
Requirement #7, and are therefore not required to provide flow control by the Department of Ecology,
the project proponent may be allowed to correct the downstream problem instead of providing on-site
flow control.
3.2 Design Event
The design events for all existing and new conveyance systems are as follows:
• All private pipe systems less than 24 inches in diameter shall be designed to convey at
minimum the 10-year, 24-hour peak flow rate without surcharging (the water depth in
the pipe must not exceed 90% of the pipe diameter).
• All private pipe systems greater than or equal to 24-inches in diameter and all public
pipe systems shall be designed to convey the 25-year, 24-hour peak flow rate without
surcharging (the water depth in the pipe must not exceed 90% of the pipe diameter).
• Culverts shall convey the 25-year, 24-hour peak flow rate without submerging the
culvert inlet (i.e. HW/D < 1).
• Constructed and natural channels shall contain the 100-year, 24-hour storm event.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 389
3.2.1 Additional Design Criteria
• For the 100-year event, overtopping of the pipe conveyance system may occur.
However, the additional flow shall not extend beyond half the lane width of the outside
lane of the traveled way and shall not exceed 4 inches in depth at its deepest point.
• All conveyance systems shall be designed for fully developed conditions. The fully
developed conditions for the project site shall be derived from the percentages of
proposed and existing impervious area. For off-site tributary areas, typical percentages
of impervious area for fully developed conditions are provided in Table III-3-13.
• Conveyance systems shall be modeled as if no on-site detention is provided
upstream.
Table III-3-13. Percentage Impervious for Fully Developed Conditions Offsite Tributary Areas
Land Use Description Percentage Impervious
Commercial/Industrial 85%
Residential 65%
3.3 Methods of Analysis
Proponent site surveys shall be used as the basis for determining the capacity of existing systems.
For preliminary analyses only, the proponent may use City of Auburn drainage maps and record
drawings. For naturally occurring drainage systems, drainage ditches, or undeveloped drainage
courses, the engineer must take into account the hydraulic capacity of the existing drainage course
and environmental considerations such as erosion, siltation, and increased water velocities or water
depths.
Describe capacities, design flows, and velocities in each reach. Describe required materials or
specifications for the design (e.g. rock lined for channels when velocity is exceeded; high density
polyethylene pipe needed for steep slope). Comprehensive maps showing the flow route and basins
for both the on-site and off-site surface water (for the minimum 1/4 mile downstream distance) must
be included in the storm drainage calculations.
If hydrologic modeling is required, the Project Engineer shall state methods, assumptions, model
parameters, data sources, and all other relevant information to the analysis. If model parameters are
used that are outside the standards of practice, or if parameters are different than those standards,
justify the parameters. Copies of all calculations for capacity of channels, culverts, drains, gutters and
other conveyance systems shall be included with the Stormwater Site Plan. If used, include all
standardized graphs and tables and indicate how they were used. Show headwater and tailwater
analysis for culverts when necessary. Provide details on references and sources of information used.
Single event modeling shall be used for designing conveyance systems, WWHM is not accepted.
For a full description of the information required for preparing a Stormwater Site Plan consult
Volume I, Chapter 4.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 390
3.3.1 Rational Method
This method shall only be used for preliminary pipe sizing and capacity analysis. For flow control
sizing derivations and water quality treatment sizing and flows see Chapter 2 of this volume and
Chapter 3 of Volume V.
The Rational Method is a simple, conservative method for analyzing and sizing conveyance elements
serving small drainage sub-basins, subject to the following specific limitations:
• Only for use in predicting peak flow rates for sizing conveyance elements (not for
use in sizing flow control or treatment facilities)
• Drainage sub-basin area, A, cannot exceed 10 acres for a single peak flow
calculation
• The time of concentration, Tc, must be computed using the method described below
and cannot exceed 100 minutes. A minimum Tc of 6.3 minutes shall be used.
• Unlike other methods of computing times of concentration, the 6.3 minutes is not an
initial collection time to be added to the total computed time of concentration.
3.3.1.1 Rational Method Equation
The following is the traditional Rational Method equation:
QR = CIRA (equation 1)
Where QR = peak flow (cfs) for a storm of return frequency R
C = estimated runoff coefficient (ratio of rainfall that becomes runoff)
IR = peak rainfall intensity (inches/hour) for a storm of return frequency R
A = drainage sub-basin area (acres)
When the composite runoff coefficient, Cc (see equation 2) of a drainage basin exceeds 0.60, the Tc
and peak flow rate from the impervious area should be computed separately. The computed peak
rate of flow for the impervious surface alone may exceed that for the entire drainage basin using the
value at Tc for the total drainage basin. The higher of the two peak flow rates shall then be used to
size the conveyance element.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 391
“C” Values
The allowable runoff coefficients to be used in this method are shown in Table III-3-14 by type of land
cover. These values were selected following a review of the values previously accepted by the City
for use in the Rational Method and as described in several engineering handbooks. The value for
single family residential areas were computed as composite values (as illustrated in the following
equation) based on the estimated percentage of coverage by roads, roofs, yards, and unimproved
areas for each density. For drainage basins containing several land cover types, the following formula
may be used to compute a composite runoff coefficient, Cc:
Cc = (C1A1+C2A2+…+CnAn)/At (equation 2)
Where At = total area (acres)
A1,2…n = areas of land cover types (acres)
C1,2…n = runoff coefficients for each area land cover type
Table III-3-14. Runoff Coefficients – “C” Values for the Rational Method
GENERAL LAND COVERS
LAND COVER C LAND COVER C
Dense forest 0.10 Playgrounds 0.30
Light forest 0.15 Gravel areas 0.80
Pasture 0.20 Pavement and roofs 0.90
Lawns 0.25 Open water (pond, lakes,
wetlands)
1.00
SINGLE FAMILY RESIDENTIAL AREAS*
[Density is in dwelling units per gross acreage (DU/GA)]
LAND COVER DENSITY C LAND COVER DENSITY C
0.20 DU/GA (1 unit per 5 ac.) 0.17 3.00 DU/GA 0.42
0.40 DU/GA (1 unit per 2.5 ac.) 0.20 3.50 DU/GA 0.45
0.80 DU/GA (1 unit per 1.25 ac.) 0.27 4.00 DU/GA 0.48
1.00 DU/GA 0.30 4.50 DU/GA 0.51
1.50 DU/GA 0.33 5.00 DU/GA 0.54
2.00 DU/GA 0.36 5.50 DU/GA 0.57
2.50 DU/GA 0.39 6.00 DU/GA 0.60
*Based on average 2,500 square feet per lot of impervious coverage.
For combinations of land covers listed above, an area-weighted “Cc x At” sum should be computed based on the equation
Cc x At = (C1 x A1)+(C2 x A2)…(Cn x An), where At = (A1+A2…An), the total drainage basin area
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 392
“IR” Peak Rainfall Intensity
The peak rainfall intensity, IR, for the specified design storm of return frequency R is determined using
a unit peak rainfall intensity factor, iR, in the following equation:
IR = (PR)(iR) (equation 3)
Where PR = the total precipitation at the project site for the 24-hour duration storm event
for the given return frequency. Refer to Table III-3-15 for PR values. Total precipitation
can also be found in Chapter 1 of Volume III.
iR = the unit peak rainfall intensity factor
The unit peak rainfall intensity factor, iR, is determined by the following equation:
iR = (aR)(Tc)(-bR) (equation 4)
Where Tc = time of concentration (minutes), calculated using the method described below
and subject to equation limitations (6.3 < Tc < 100)
aR, bR = coefficients from Table III-3-15 used to adjust the equation for the design
storm
return frequency R
Table III-3-16 includes a table of rainfall intensity as a function of time of concentration, calculated
using the coefficients from Table III-3-15.
Table III-3-15. Coefficients for the Rational Method
Design Storm
Frequency
PR (inches) aR bR
2 years 2.0 1.58 0.58
5 years 2.5 2.33 0.63
10 years 3.0 2.44 0.64
25 years 3.5 2.66 0.65
50 years 3.5 2.75 0.65
100 years 4.0 2.61 0.63
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 393
Table III-3-16. Rainfall Intensities for the City of Auburn
Rainfall Intensity (IR) (inches per hour)
Design storm recurrence interval (probability)
Time of
Concentration
(min)
2-year
(50%)
5-year
(20%)
10-year
(10%)
25-year
(4%)
50-year
(2%)
100-year
(1%)
6.3 1.09 1.83 2.25 2.81 2.91 3.27
7 1.02 1.71 2.11 2.63 2.72 3.06
8 0.95 1.57 1.93 2.41 2.49 2.82
9 0.88 1.46 1.79 2.23 2.31 2.62
10 0.83 1.37 1.68 2.08 2.15 2.45
11 0.79 1.29 1.58 1.96 2.03 2.30
12 0.75 1.22 1.49 1.85 1.91 2.18
13 0.71 1.16 1.42 1.76 1.82 2.07
14 0.68 1.10 1.35 1.67 1.73 1.98
15 0.66 1.06 1.29 1.60 1.66 1.90
16 0.63 1.02 1.24 1.54 1.59 1.82
17 0.61 0.98 1.19 1.48 1.53 1.75
18 0.59 0.94 1.15 1.42 1.47 1.69
19 0.57 0.91 1.11 1.37 1.42 1.63
20 0.56 0.88 1.08 1.33 1.37 1.58
25 0.49 0.77 0.93 1.15 1.19 1.37
30 0.44 0.68 0.83 1.02 1.06 1.22
35 0.40 0.62 0.75 0.92 0.95 1.11
40 0.37 0.57 0.69 0.85 0.88 1.02
45 0.35 0.53 0.64 0.78 0.81 0.95
50 0.33 0.50 0.60 0.73 0.76 0.89
55 0.31 0.47 0.56 0.69 0.71 0.84
60 0.29 0.44 0.53 0.65 0.67 0.79
70 0.27 0.40 0.48 0.59 0.61 0.72
80 0.25 0.37 0.44 0.54 0.56 0.66
90 0.23 0.34 0.41 0.50 0.52 0.61
100 0.22 0.32 0.38 0.47 0.48 0.57
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 394
“Tc” Time of Concentration
The time of concentration is defined as the time it takes runoff to travel overland (from the onset of
precipitation) from the most hydraulically distant location in the drainage basin to the point of
discharge.
Due to the mathematical limits of the equation coefficients, values of Tc less than 6.3 minutes or
greater than 100 minutes cannot be used. Therefore, real values of Tc less than 6.3 minutes must be
assumed to be equal to 6.3 minutes, and values greater than 100 minutes must be assumed to be
equal to 100 minutes.
Tc is computed by summation of the travel times Tt of overland flow across separate flowpath
segments. The equation for time of concentration is:
Tc = T1 + T2 + … + Tn (equation 5)
Where T1,2…n = travel time for consecutive flowpath segments with different categories or
flowpath slope
Travel time for each segment, t, is computed using the following equation:
Tt = L/60V (equation 6)
where Tt = travel time (minutes)
Tt through an open water body (such as a pond) shall be assumed to be zero with this method.
Tt = Travel time for each segment (ft)
L = the distance of flow across a given segment (feet)
V = average velocity (ft/s) across the land cover = oRsk
Where kR = time of concentration velocity factor; see Table III-3-17.
s0 = slope of flowpath (feet/feet)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 395
Table III-3-17. “n” and “k” Values Used in Time Calculations for Hydrographs
“ns” Sheet Flow Equation Manning’s Values (for the initial 300 ft. of travel)
Manning values for sheet flow only, from Overton and Meadows 19761 ns
Smooth surfaces (concrete, asphalt, gravel, or bare hand packed soil) 0.011
Fallow fields or loose soil surface (no residue) 0.05
Cultivated soil with residue cover <20% 0.06
Cultivated soil with residue cover >20% 0.17
Short prairie grass and lawns 0.15
Dense grasses 0.24
Bermuda grass 0.41
Range (natural) 0.13
Woods or forest with light underbrush 0.40
Woods or forest with dense underbrush 0.80
“k” Values Used in Travel Time/Time of Concentration Calculations2
Sheet Flow kR
Forest with heavy ground litter and meadow 2.5
Fallow or minimum tillage cultivation 4.7
Short grass pasture and lawns 7.0
Nearly bare ground 10.1
Grasses waterway 15.0
Paved area (sheet flow) and shallow gutter flow 20.0
Shallow Concentrated Flow (After the initial 300 ft. of sheet flow, R = 0.1) ks
1. Forest with heavy ground litter and meadows (n = 0.10) 3
2. Brushy ground with some trees (n= 0.060) 5
3. Fallow or minimum tillage cultivation (n = 0.040) 8
4. High grass (n = 0.035) 9
5. Short grass, pasture and lawns (n = 0.030) 11
6. Nearly bare ground (n = 0.025) 13
7. Paved and gravel areas (n = 0.012) 27
Channel Flow (intermittent) (At the beginning of visible channels R = 0.2) kc
1. Forested swale with heavy ground litter (n = 0.10) 5
2. Forested drainage course/ravine with defined channel bed (n = 0.050) 10
3. Rock-lined waterway (n = 0.035) 15
4. Grassed waterway (n = 0.030) 17
5. Earth-lined waterway (n = 0.025) 20
6. CMP pipe, uniform flow (n = 0.024) 21
7. Concrete pipe, uniform flow (0.012) 42
8. Other waterways and pipe 0.508/n
Channel Flow (Continuous stream, R = 0.4) kc
9. Meandering stream with some pools (n = 0.040) 20
10. Rock-lined stream (n = 0.035) 23
11. Grass-lined stream (n = 0.030) 27
12. Other streams, man-made channels and pipe 0.807/n
1 See TR-55, 1986 2 210-VI-TR-55, Second Ed., June 1986
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 396
3.4 Pipes, Culverts and Open Channels
This section presents the methods, criteria and details for analysis and design of pipe systems,
culverts, and open channel conveyance systems.
Storm drainage conveyance for public street requirements are as follows:
• Maximum surface run without considering curve super elevation (gutter flow) between
catch basins on paved roadway surfaces shall be as follows:
Pavement Slope, % Maximum Flow Length, ft
0.5 – 1 200
1 to 6 300
6 to 12 200
• The minimum longitudinal street gutter slope shall be one/half percent (0.5%).V
• Vaned catch basin grates and through-curb inlets may be required for roadway grades in
excess of six percent (6%).
• Storm manholes or catch basins shall not be designed within the vehicular wheel paths.
• The design of street drainage conveyance should seek to minimize the number of
structures and redundant pipes.
3.4.1 Pipe Systems
Pipe systems are networks of storm drain pipes, catch basins, manholes, inlets, and outfalls,
designed and constructed to convey surface water. The hydraulic analysis of flow in storm drainage
pipes typically is limited to gravity flow; however in analyzing existing systems it may be necessary to
address pressurized conditions. A properly designed pipe system will maximize hydraulic efficiency
by utilizing proper material, slope, and pipe size.
3.4.1.1 Design Flows
Design flows for sizing or assessing the capacity of pipe systems shall be determined using the
hydrologic analysis methods described in this chapter. Approved single event models described in
Chapter 1 of this volume may also be used to determine design flows. The design event is described
in Section 3.2. Pipe systems shall be designed to convey the design event without surcharging (water
depth in pipe shall not exceed 90% of the pipe diameter).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 397
3.4.1.2 Conveyance Capacity
Two methods of hydraulic analysis using Manning’s Equation are required by the City of Auburn for
the analysis of pipe systems. First, the Uniform Flow Analysis method is used for preliminary
design and analysis of pipe systems. Second, the Backwater Analysis method is used to analyze
both proposed and existing pipe systems to verify adequate capacity. See Section 3.2 for the
required design events for pipe systems.
Uniform Flow Analysis
This method is typically used for preliminary sizing of new pipe systems to convey the design flow as
calculated from the required design event from Section 3.2.
Assumptions:
• Flow is uniform in each pipe (i.e., depth and velocity remain constant throughout the
pipe for a given flow).
• Friction head loss in the pipe barrel alone controls capacity. Other head losses (e.g.,
entrance, exit, junction, etc.) and any backwater effects or inlet control conditions are
not specifically addressed.
• All pipes shall be designed for fully developed conditions. The fully developed
conditions shall be derived from the percentages of impervious area provided in
Table III-3-18.
Table III-3-18. Percentage Impervious for Modeling Fully Developed Conditions
Land Use Description1 % Impervious
Commercial/Industrial 85
Residential 65
1 For the land use descriptions, roads are included in the percentage impervious.
• All pipes shall be modeled as if no on-site detention is provided up-stream.
Each pipe within the system shall be sized and sloped such that its barrel capacity at normal full
flow is equal to or greater than the design flow calculated from the appropriate design storm as
identified in Section 3.2. The nomographs in Figure III-3-23 can be used for approximate sizing of the
pipes or Manning’s Equation can be solved for pipe size directly:
2/13/249.1 SRnV= (equation 7)
or use the continuity equation, Q = A•V, such that
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 398
2/13/249.1 SARnQ= (equation 8)
Where Q = discharge (cfs)
V = velocity (fps)
A = area (sf)
n = Manning’s roughness coefficient; see Table III-3-19
R = hydraulic radius = area/wetted perimeter
S = slope of the energy grade line (ft/ft)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 399
Figure III-3-23. Nomograph for Sizing Circular Drains Flowing Full
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 400
Table III-3-19. Manning’s “n” Values for Pipes
Analysis Method
Type of Pipe Material
Backwater Flow Manning’s
Equation Flow
A. Concrete pipe and CPEP-smooth interior pipe 0.012 0.014
B. Annular Corrugated Metal Pipe or Pipe Arch:
1. 2-2/3” x 1/2” corrugation (riveted)
a. plain or fully coated
b. paved invert (40% of circumference paved):
(1) flow full depth
(2) flow 0.8 depth
(3) flow 0.6 depth
c. treatment
2. 3” x 1” corrugation
3.6” x 2” corrugation (field bolted)
0.024
0.018
0.016
0.013
0.013
0.027
0.030
0.028
0.021
0.018
0.015
0.015
0.031
0.035
C. Helical 2-2/3” x 1/2” corrugation and CPEP-single
wall
0.024 0.028
D. Spiral rib metal pipe and PVC pipe 0.011 0.013
E. Ductile iron pipe cement lined 0.012 0.014
F. High density polyethylene pipe (butt fused only) 0.009 0.009
For pipes flowing partially full, the actual velocity may be estimated from the hydraulic properties
shown in Figure III-3-24 by calculating Qfull and Vfull and using the ratio of Qdesign/Qfull to find V and d
(depth of flow).
Table III-3-19 provides the recommended Manning’s “n” values for preliminary design for pipe
systems. The “n” values for this method are 15% higher in order to account for entrance, exit,
junction, and bend head losses.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 401
Figure III-3-24. Circular Channel Ratios
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 402
3.4.1.3 Backwater Analysis
A backwater analysis shall be required when the design depth of flow is greater than 90% of the pipe
inside diameter or as directed by the City. The backwater analysis method described in this section is
used to analyze the capacity of both proposed and existing pipe systems to convey the required
design flow (i.e., either the 10-year or 25-year peak flow as required in Section 3.2). The backwater
analysis shall verify that the pipe system meets the following conditions:
• For the 25-year event, there shall be a minimum of 0.5 feet of freeboard between the
water surface and the top of any manhole or catch basin.
• For the 100-year event, overtopping of the pipe conveyance system may occur,
however, the additional flow shall not extend beyond half the lane width of the
outside lane of the traveled way and shall not exceed 4 inches in depth at its deepest
point. Refer to the Washington State Department of Transportation (WSDOT)
Hydraulics Manual for pavement drainage calculations. Off-channel storage on
private property is allowed with recording of the proper easements. When this
occurs, the additional flow over the ground surface is analyzed using the methods for
open channels described in Sections 3.2 and 3.4.3 and added to the flow capacity of
the pipe system.
This method is used to compute a simple backwater profile (hydraulic grade line) through a proposed
or existing pipe system for the purposes of verifying adequate capacity. It incorporates a re-arranged
form of Manning’s equation expressed in terms of friction slope (slope of the energy grade line in ft/ft).
The friction slope is used to determine the head loss in each pipe segment due to barrel friction,
which can then be combined with other head losses to obtain water surface elevation at all structures
along the pipe system.
The backwater analysis begins at the downstream end of the pipe system and is computed back
through each pipe segment and structure upstream. The friction, entrance, and exit head losses
computed for each pipe segment are added to that segment’s tailwater elevation (the water surface
elevation at the pipes’ outlet) to obtain its outlet control headwater elevation. This elevation is then
compared with the inlet control headwater elevation, computed assuming the pipe’s inlet alone is
controlling capacity using the methods for inlet control presented in Section 3.4.2. The condition that
creates the highest headwater elevation determines the pipe’s capacity. The approach velocity head
is then subtracted from controlling headwater elevation, and the junction and bend head losses are
added to compute the total headwater elevation, which is then used as the tailwater elevation for the
upstream pipe segment.
The Backwater Calculation Sheet in Figure III-3-25 can be used to compile the head losses and
headwater elevations for each pipe segment. The numbered columns on this sheet are described in
Table III-3-20. An example calculation is performed in Figure III-3-26.
This method should not be used to compute stage/discharge curves for level pool routing purposes.
See Volume III, Chapter 2 for level pool routing.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 403
Figure III-3-25. Backwater Calculation Sheet
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 404
Table III-3-20. Backwater Calculation Sheet Notes
Column Description
(1) Design flow to be conveyed by pipe segment.
(2) Length of pipe segment.
(3) Pipe size: indicate pipe diameter or span % rise.
(4) Manning’s “n” value.
(5) Outlet Elevation of pipe segment.
(6) Inlet Elevation of pipe segment.
(7) Barrel Area: this is the full cross-sectional area of the pipe.
(8) Barrel Velocity: this is the full velocity in the pipe as determined by:
V = Q/A or Col. (8) = Col. (1)/Col. (7)
(9) Barrel Velocity Head = V3/2g or (Col. (8))2/2g;
Where g = 32.2 ft./sec.2 (acceleration due to gravity)
(10) Tailwater (TW) Elevation: this is the water surface elevation at the outlet of the pipe segment. If the pipe’s outlet is not
submerged by the TW and the TW depth is less than D+dc)/2, set TW equal to D+dc)/2 to keep the analysis simple and still
obtain reasonable results (D=pipe barrel height and dc=critical depth, both in feet. See Figure III-3-33 for determination of dc.
(11) Friction Loss = Sf x L (or Sf X Col (2));
Where Sf is the friction slope or head loss per linear foot of pipe as determined by Manning’s equation expressed in the form:
Sf = (nV)2/2.22R1.33
(12) Hydraulic Grade Line (HGL) Elevation just inside the entrance of the pipe barrel; this is determined by adding the friction loss
to the TW elevation: Col. (12) = Col. (11) + (Col. (10)
If this elevation falls below the pipe’s inlet crown, it no longer represents the true HGL when computed in this manner. The
true HGL will fall somewhere between the pipe’s crown and either normal flow depth or critical flow depth, whichever is
greater. To keep the analysis simple and still obtain reasonable results (i.e. erring on the conservative side), set the HGL
elevation equal to the crown elevation.
(13) Entrance Head Loss = Ke/2g (or Ke x Col (9))
Where Ke = Entrance Loss Coefficient from Table III-3-24. This is the head lost due to flow contractions at the pipe entrance.
(14) Exit Head Loss = 1.0 x V2/2g or 1.0 x Col. (9);
This is the velocity head lost or transferred downstream.
(15) Outdoor Control Elevation = Col. (12) + Col. (13) + Col. (14)
This is the maximum headwater elevation assuming the pipe’s barrel and inlet/outlet characteristics are controlling capacity. It
does not include structure losses or approach velocity considerations.
(16) Inlet Control Elevation (see Section 3.4.2.5 for computation of inlet control on culverts); this is the maximum headwater
elevation assuming the pipe’s inlet is controlling capacity. It does not include structure losses or approach velocity
considerations.
(17) Approach Velocity Head: This is the amount of head/energy being supplied by the discharge from an upstream pipe or
channel section, which serves to reduce the headwater elevation. If the discharge is from a pipe, the approach velocity head
is equal to the barrel velocity head computed for the upstream pipe. If the upstream pipe outlet is significantly higher in
elevation (as in a drop manhole) or lower in elevation such that its discharge energy would be dissipated, an approach
velocity head of zero should be assumed.
(18) Bend Head Loss = Kb x V2/2g (or Kb x Col. (17));
Where Kb = Bend Loss Coefficient (from Figure III-3-32). This is due to loss of head/energy required to change direction of
flow in an access structure.
(19) Junction Head Loss: This is the loss in head/energy which results from the turbulence created when two or more streams are
merged into one within the access structure. Figure III-3-30 can be used to determine this loss, or it an be computed using the
following equations derived from Figure III-3-30:
Junction Head Loss = Kj x V2/2g (or Kj x Col. (17)
where Kj is the Junction Loss Coefficient determined by:
Kj = (Q3/Q1)/(1.18 + 0.63(Q3/Q1))
(20) Headwater (HW) Elevation: This is determined by combining the energy heads in Columns 17, 18, and 19 with the highest
control elevation in either Column 15 or 16, as follows:
Col. (20) = Col. (15 or 16) – Col. (17) + Col. (18) + Col. (19)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 405
Figure III-3-26. Backwater Pipe Calculation Example
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 406
3.4.1.4 Inlet Grate Capacity
The Washington State Department of Transportation (WSDOT) Hydraulics Manual can be used in
determining the capacity of inlet grates when capacity is of concern. When verifying capacity,
assume:
• Grate areas on slopes are 80 percent free of debris, and “vaned” grates are
95 percent free.
• Grate areas in sags or low spots are 50 percent free of debris, and “vaned” grates,
75 percent free.
3.4.1.5 Pipe Materials
See City of Auburn Construction Standards Division 7 for pipe specifications.
3.4.1.6 Pipe Sizes
• The following pipe sizes shall be used for pipe systems to be maintained by the City
of Auburn: 12-inch, 15-inch, 18-inch, 21-inch, 24-inch, 30-inch, 36-inch and 42-inch.
• Pipes smaller than 12-inch may only be used for privately maintained systems, or to
match the diameter of existing downstream mains, or as approved in writing by the
City.
• Catch basin leads shall be a minimum of 12-inch.
• Single-family home site roof, foundation and driveway drains may use pipe as small
as 4 inch.
• Non-single family roof, foundation and small driveway drains may use pipe as small
as 6-inch. Pipes under 10-inch may require capacity analysis if requested by the
City.
• For pipes larger than 30-inch increasing increments of 6-inch intervals shall be used
(36-inch, 42-inch, 48-inch, etc.).
3.4.1.7 Changes in Pipe Sizes
• Pipe direction changes or size increases or decreases are only allowed at manholes
and catch basins.
• Where a minimal fall is necessary between inlet and outlet pipes in a structure, pipes
must be aligned vertically by one of the following in order of preference:
a. Match pipe crowns
b. Match 80% diameters of pipes
c. Match pipe inverts or use City approved drop inlet connection
3.4.1.8 Pipe Alignment and Depth
• Pipes must be laid true to line and grade with no curves, bends, or deflections in any
direction.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 407
Exception: Vertical deflections in HDPE and ductile iron pipe with flanged restrained
mechanical joint bends (not greater than 30%) on steep slopes are allowed provided the pipe
adequately drains, with a minimum velocity of 2 feet per second (fps).
• A break in grade or alignment or changes in pipe material shall occur only at catch
basins or manholes.
• For the standard main alignment refer to the City’s Engineering Design and
Construction Standards.
• The standard depth for new mains measures six (6) feet from the center of the pipe
to the main street surface.
• The project engineer shall consult with the City for the potential of a future extension
of the storm system. In this case, the City may require modifications to the depth or
alignment.
• Connections to the main shall be at 90°. Slight variations may be allowed.
• Pipes shall be allowed to cross under retaining walls as specifically approved in
writing by the City when no other reasonable alternatives exist.
3.4.1.9 Pipe Slopes and Velocities
• The slope of the pipe shall be set so that a minimum velocity of 2 feet per second
can be maintained at full flow.
• A minimum slope for all pipes shall be 0.5% (under certain circumstances, a
minimum slope of 0.3% may be allowed with prior approval in writing from The City).
• Maximum slopes, velocities, and anchor spacings are shown in Table III-3-21. If
velocities exceed 15 feet per second for the conveyance system design event
described in Section 3.2, provide anchors and/or restrained joints at bends and
junctions.
3.4.1.10 Pipes on Steep Slopes
• Slopes 20% or greater shall require all drainage to be piped from the top to the
bottom in High Density Polyethylene (HDPE) pipe (butt-fused) or ductile iron pipe
welded or mechanically restrained. Additional anchoring design is required for these
pipes.
• Above-ground installation is required on slopes greater than 40% to minimize
disturbance to steep slopes, unless otherwise approved in writing by The City.
• HDPE pipe systems longer than 100 feet must be anchored at the upstream end if
the slope exceeds 20% or as required by The City.
• Above ground installations of HDPE shall address the high thermal
expansion/contraction coefficient of the pipe material. An analysis shall be completed
to demonstrate that the system as designed will tolerate the thermal expansion of the
pipe material.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 408
Table III-3-21. Maximum Pipe Slopes, Velocities and Anchor Requirements
Pipe Material Pipe Slope Above Which Pipe
Anchors Required and Minimum Anchor Spacing
Max. Slope
Allowed
Max. Velocity
@ Full Flow
Spiral Rib1, PVC1 20% (1 anchor per 100 L.F. of pipe) 30%(3) 30 fps
Concrete1 10% (1 anchor per 50 L.F. of pipe) 20%(3) 30 fps
Ductile Iron4 40% (1 anchor per pipe section) None None
HDPE2 50% (1 anchor per 100 L.F. of pipe – cross slope
installations may be allowed with additional
anchoring and analysis)
None None
1 Not allowed in landslide hazard areas.
2 Butt-fused pipe joints required. Above-ground installation is required on slopes greater than 40% to minimize disturbance
to steep slopes.
3 Maximum slope of 20% allowed for these pipe materials with no joints (one section) if structures are provided at each
end and the pipes are property grouted or otherwise restrained to the structures.
4 Restrained joints required on slopes greater than 25%. Above-ground installation is required on slopes greater than 40%
to minimize disturbance to steep slopes.
3.4.1.11 Structures
For the purposes of this Manual, all catch basins and manholes shall meet WSDOT standards such
as Type 1L, Type 1, and Type 2. Table III-3-22 presents the structures and pipe sizes allowed by size
of structure.
Table III-3-22. Allowable Structures and Pipe Sizes
Maximum Inside Pipe Diameter
Catch Basin Type1 CMP)(5), Spiral Rib)5, CPEP (single wall)5, HDPP,
Ductile Iron, PVC 2
(Inches)
Concrete, CPEP
(smooth interior),
(Inches)
Inlet 4
Type 1 3
Type IL 3
Type 2 - 48-inch dia.
Type 2 - 54-inch dia.
Type 2 – 60-inch dia.
Type 2 - 72-inch dia.
Type 2 - 96-inch dia.
12
15
21
30
36
42
54
72
12
12
18
24
30
36
42
60
1 Catch basins (including manhole steps, ladder, and handholds) shall conform to the W.S.D.O.T. Standard Plans or an
approved equal based upon submittal for approval.
2 Maintain the minimum sidewall thickness per this Section.
3 Maximum 5 vertical feet allowed between grate and invert elevation.
4 Normally allowed only for use in privately maintained drainage systems and must discharge to a catch basin immediately
downstream.
5 Allowed for private system installations only.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 409
The following criteria shall be used when designing a conveyance system that utilizes catch basins or
manholes:
• Catch basin (or manhole) diameter shall be determined by pipe diameter and
orientation at the junction structure. A plan view of the junction structure, drawn to
scale, will be required when more than four pipes enter the structure on the same
plane, or if angles of approach and clearance between pipes is of concern. The plan
view (and sections if necessary) must insure a minimum distance (of solid concrete
wall) between pipe openings of 8 inches for 48-inch and 54-inch diameter catch
basins and 12 inches for 72-inch and 96-inch diameter catch basins
• Type 1 catch basins should be used when overall catch basin height does not
exceed eight (8) feet or when the invert depth does not exceed five (5) feet below
rim.
• Type 1L catch basins should be used for the following situations:
o When overall catch basin height does not exceed eight (8) feet or when invert
depth does not exceed five (5) feet below rim.
o When any pipes tying into the structure exceed 21 inches connecting to the
long side, or 18 inches connecting to the short side at or very near to right
angles.
• Type 2 (48-inch minimum diameter) catch basins or manholes shall be used at the
following locations or for the following situations:
o When overall structure height exceed 8 feet.
o When all pipes tying into the structure exceed the limits set for Type 1
structures. Type 2 catch basins or manholes over 4 feet in height shall have
standard ladders.
o All Type 2 catch basins shall be specifically approved by the City. Type 2
catch basins shall not be substituted for manholes unless specifically
approved by The City.
• The maximum slope of ground surface for a radius of 5 feet around a catch basin
grate shall be 3:1. The preferred slope is 5:1 to facilitate maintenance access.
• Catch basin (or manhole) evaluation of structural integrity for H-20 loading will be
required for multiple junction catch basins and other structures that exceed the
recommendations of the manufacturers. The City may require further review for
determining structural integrity.
• Catch basins leads shall be no longer than 50 feet.
• Catch basins shall not be installed in graveled areas or sediment generating areas.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 410
• Catch basins shall be located:
o At the low point of any sag vertical curve or grade break where the grade of
roadway transitions from a negative to a positive grade.
o Prior to any intersection such that a minimal amount of water flows across the
intersection, through a curb ramp, or around a street return.
o Prior to transitions from a typical crown to a full warp through a down hill
grade.
• Catch basins shall not be placed in areas of expected pedestrian traffic. The
engineer shall avoid placing a catch basin in crosswalks, adjacent to curb ramps, or
in the gutter of a driveway. Care shall be taken on the part of the engineer to assure
that the catch basin will not be in conflict with any existing or proposed utilities.
• All catch basins, inlets, etc. shall be marked as directed by the City.
• Connections to structures and mains shall be at 90°. Slight variations may be
allowed.
• The maximum surface run between structures shall not exceed 400 linear feet.
• Changes in pipe direction, or increases or decreases in size, shall only be allowed at
structures.
• For pipe slope less than the required minimum, distance between structures shall be
decreased to 200 linear feet.
• For Type 1and 1L, catch basin to catch basin connections shall not be allowed.
• Bubble up systems shall not be allowed.
3.4.1.12 Pipe Clearances
Horizontal
A minimum of 5 feet horizontal separation shall be maintained between the storm main and all water
or sanitary sewer mains. This shall also apply to laterals.
Vertical
Where crossing an existing or proposed utility or sanitary sewer main, the alignment of the storm
system shall be such that the two systems cross as close to perpendicular as possible. Where
crossing a sanitary sewer main, provide a minimum 18 inches of vertical separation. For crossings of
water mains refer to the City Engineering Design and Construction Standards. The minimum vertical
separation for a storm main crossing any other utility shall be 6 inches. Note: Where the vertical
separation of two parallel systems exceeds the horizontal separation, additional horizontal separation
may be required to provide future access to the deeper system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 411
3.4.1.13 Pipe Cover
• Suitable pipe cover over storm pipes in road rights-of-way shall be calculated for H-
20 loading by the Project Engineer. Pipe cover is measured from the finished grade
elevation down to the top of the outside surface of the pipe. Pipe manufacturer’s
recommendations are acceptable if verified by the Project Engineer.
• PVC (ASTM D3034 - SDR 35) minimum cover shall be three feet in areas subject to
vehicular traffic; maximum cover shall be 30 feet or per the manufacturer’s
recommendations and as verified with calculations from the Project Engineer.
• Cover for ductile iron pipe may be reduced to a 1-foot minimum. Use of reinforced
concrete pipe or AWWA C900 PVC pipe in this situation requires the engineer to
provide verifying calculations to confirm the adequacy of the selected pipe’s strength
for the burial condition.
• Pipe cover in areas not subject to vehicular loads, such as landscape planters and
yards, may be reduced to a 1-foot minimum.
• Catch basin evaluation of structural integrity for H-20 loading will be required for
multiple junction catch basins and other structures that exceed the recommendations
of the manufacturers.
3.4.1.14 System Connections
Connections to a pipe system shall be made only at catch basins or manholes. No wyes or tees are
allowed except on private roof/footing/yard drain systems on pipes 8 inches in diameter, or less.
Where wyes and tees are utilized, clean-outs shall be required upstream of each wye and tee.
Connections to structures and mains shall be at 90°. Slight variations may be allowed.
Minimum fall through manhole structures shall be 0. 1 foot. Pipes of different diameters shall be
aligned vertically in manholes by one of the following methods, listed in order of preference:
1. Match pipe crowns
2. Match 80% diameters of pipes.
3. Match pipe inverts or use City approved drop inlet connection.
Drop connections shall be considered on a case by case basis.
Private connections to the City storm system shall be at a drainage structure (i.e. catch basin or
manhole) and only if sufficient capacity exists. Tee connections into the side of a pipe shall not be
permitted.
Roof downspouts may be infiltrated or dispersed in accordance with the provisions of Chapter 2.
Infiltration and dispersion shall be evaluated first. If infiltration and dispersion are not feasible, roof
drains may be discharged through the curb per Section 2.1.5 into the roadway gutter or connected
into a drainage structure. Roof downspouts may not be connected directly into the side of a storm
drainage pipe.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 412
3.4.1.15 Debris Barriers
Access barriers are required on all pipes 12 inches and larger exiting a closed pipe system. Debris
barriers (trash racks) are required on all pipes entering a pipe system. See Figure III-3-27 for required
debris barriers on pipe ends outside of roadways and for requirements on pipe ends (culverts)
projecting from driveways or roadway side slopes.
Figure III-3-27. Debris Barrier
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 413
3.4.2 Culverts
Culverts are relatively short segments of pipe of circular, elliptical, rectangular, or arch cross section
and typically convey flow under road embankments or driveways. Culverts installed in streams and
natural drainages shall meet the City’s Critical Areas Code and any fish passage requirements of the
Washington State Department of Fish and Wildlife.
3.4.2.1 Design Event
The design event for culverts is given in Section 3.2.
3.4.2.2 Design Flows
Design flows for sizing or assessing the capacity of culverts shall be determined using the hydrologic
analysis methods described in this chapter.
Other single event models as described in Chapter 2 of this volume may be used to determine
design flows. In addition, culverts shall not exceed the headwater requirements as established below:
3.4.2.3 Headwater
• For culverts 18-inch diameter or less, the maximum allowable headwater elevation
for the 100-year, 24-hour design storm (measured from the inlet invert) shall not
exceed 2 times the pipe diameter or arch-culvert-rise.
• For culverts larger than 18-inch diameter, the maximum allowable headwater
elevation for the 100-year, 24-hour design storm (measured from the inlet invert)
shall not exceed 1.5 times the pipe diameter or arch-culvert-rise.
• The maximum headwater elevation at the 100-year, 24-hour design flow shall be
below any road or parking lot subgrade.
3.4.2.4 Conveyance Capacity
Use the procedures presented in this section to analyze both inlet and outlet control conditions to
determine which governs. Culvert capacity is then determined using graphical methods.
3.4.2.5 Inlet Control Analysis
Nomographs such as those provided in Figure III-3-28 and Figure III-3-29 can be used to determine
the inlet control headwater depth at design flow for various types of culverts and inlet configurations.
These and other nomographs can be found in the FHWA publication Hydraulic Design of Highway
Culverts, HDS No. #5 (Report No. FHWA-NHI-01-020), September 2001; or the WSDOT Hydraulic
Manual.
Also available in the FHWA publication are the design equations used to develop the inlet control
nomographs. These equations are presented below.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 414
For unsubmerged inlet conditions (defined by Q/AD0.5 < 3.5);
Form 1*: HW/D = Hc /D + K(Q/AD0.5)M - 0.5S** (equation 9)
Form 2*: HW/D = K(Q/AD0.5)M (equation 10)
For submerged inlet conditions (defined by Q/AD0.5> 4.0);
HW/D = c(Q/AD0.5)2 + Y – 0.5S** (equation 11)
Where HW = headwater depth above inlet invert (ft)
D = interior height of culvert barrel (ft)
Hc = specific head (ft) at critical depth (dc + Vc
2/2g)
Q = flow (cfs)
A = full cross-sectional area of culvert barrel (sf)
S = culvert barrel slope (ft/ft)
K,M,c,Y = constants from Table III-3-23
The specified head Hc is determined by the following equation:
Hc = dc + Vc
2/2g (equation 12)
where dc = critical depth (ft); see Figure III-3-33
Vc = flow velocity at critical depth (fps)
g = acceleration due to gravity (32.2 ft/sec2)
* The appropriate equation form for various inlet types is specified in Table III-3-23
** For mitered inlets, use +0.7S instead of –0.5S.
NOTE: Between the unsubmerged and submerged conditions, there is a transition zone
(3.5 < Q/AD0.5<4.0) for which there is only limited hydraulic study information. The transition
zone is defined empirically by drawing a curve between and tangent to the curves defined by
the unsubmerged and submerged equations. In most cases, the transition zone is short and
the curve is easily constructed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 415
Figure III-3-28. Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control
DI
A
M
E
T
E
R
O
F
C
U
L
V
E
R
T
(
D
)
I
N
I
N
C
H
E
S
ENTRANCE
TYPE
HW
D SCALE
(1)
(2)
(3)
Square edge with
Groove end with
Groove end
headwall
headwall
projecting
EXAMPLE
D = 42 inches (3.0 feet).
Q = 120 cfs
HW*
*D in feet
HW
D (feet)
(1)
(2)
(3)
2.5
2.1
2.2
8.8
7.4
7.7
EXAMP
L
E
DI
S
C
H
A
R
G
E
(
Q
)
I
N
C
F
S
HE
A
D
W
A
T
E
R
D
E
P
T
H
I
N
D
I
A
M
E
T
E
R
S
(
H
W
/
D
)
To use scale (2) or (3) project
horizontally to scale (1), then
use straight inclined line through
D and Q scales, or reverse as
illustrated.
1.0
2
3
4
5
6
8
10
20
30
40
50
60
12
15
18
21
24
27
30
33
36
80
100
200
300
400
500
600
800
1,000
42
48
54
60
2,000
3,000
4,000
5,000
6,000
8,000
10,000
72
84
96
108
120
132
144
156
168
180
ENTRANCE TYPE
SQUARE EDGE WITH
HEADWALL
GROOVE END WITH
GROOVE END
PROJECTING
HEADWALL
PLAN
PLAN
(1)(2)(3)
.5
.5 .5
.6
.6 .6
.7
.7 .7
.8
.8 .8
.9
.9 .9
1.0
1.0 1.0
1.5
1.5 1.5
2.
2.
3.
3.3.
4.
4.
4.
5.
2.
(3)
(2)
(1)
5.
5.
6.
6.
6.
New Design Manual
Figure 4.3.1.B Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control
Revised 12-2-97/Mdev
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 416
Figure III-3-29. Headwater Depth for Corrugated Pipe Culverts with Inlet Control
ST
A
N
D
A
R
D
C
.
M
.
DI
A
M
E
T
E
R
O
F
C
U
L
V
E
R
T
(
D
)
I
N
I
N
C
H
E
S
ST
R
U
C
T
U
R
A
L
P
L
A
T
E
C
.
M
.
ENTRANCE
TYPE
HW
D SCALE
(1)
(2)
(3)
Headwall
Mitered to conform
to slope
Projecting
EXAMPLE
D = 36 inches (3.0 feet).
Q = 66 cfs
HW*
*D in feet
HW
D (feet)
(1)
(2)
(3)
1.8
2.1
2.2
5.4
6.3
6.6
EXAM
P
L
E
DI
S
C
H
A
R
G
E
(
Q
)
I
N
C
F
S
HE
A
D
W
A
T
E
R
D
E
P
T
H
I
N
D
I
A
M
E
T
E
R
S
(
H
W
/
D
)
To use scale (2) or (3) project
horizontally to scale (1), then
use straight inclined line through
D and Q scales, or reverse as
illustrated
1.0
2
3
4
5
6
8
10
20
30
40
50
60
12
15
18
21
24
27
30
33
36
80
100
200
300
400
500
600
800
1,000
42
48
54
60
2,000
3,000
4,000
5,000
6,000
8,000
10,000
72
84
96
108
120
132
144
156
168
180
ENTRANCE TYPE
HEADWALL PLAN
MITERED TO
CONFORM
TO SLOPE
SECTION
PROJECTING
SECTION
(1)
(2)
(3)
.5 .5
.5
.6 .6
.6
.7 .7
.7
.8 .8
.8
.9 .9
.9
1.0 1.0
1.0
1.5
1.5 1.5
2.
2.
3.
3.
3.
4.
4.
4.
5.
2.
(3)
(2)
(1)
5.
5.
6.
6.
6.
New Design Manual
Figure 4.3.1.C Headwater Depth for Corrugated Pipe Culverts with Inlet Control
Revised 11-24-97/Mdev
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 417
Table III-3-23. Constants for Inlet Control Equations*
Unsubmerged Submerged Shape and
Material Inlet Edge Description Equation
Form K M c Y
Circular Concrete Square edge with headwall
Groove end with headwall
Groove end projecting
1 0.0098
0.0078
0.0045
2.0
2.0
2.0
0.0398
0.0292
0.0317
0.67
0.74
0.69
Circular CMP Headwall
Mitered to slope
Projecting
1 0.0078
0.0210
0.0340
2.0
1.33
1.50
0.0379
0.0463
0.0553
0.69
0.75
0.54
Rectangular Box 30o to 75o wingwall flares
90o and 15o wingwall flares
0o wingwall flares
1 0.026
0.061
0.061
1.0
0.75
0.75
0.0385
0.0400
0.0423
0.81
0.80
0.82
CM Boxes 90o headwall
Thick wall projecting
Thin wall projecting
1 0.0083
0.0145
0.0340
2.0
1.75
1.5
0.0379
0.0419
0.0496
0.69
0.64
0.57
Arch CMP 90o headwall
Mitered to slope
Projecting
1 0.0083
0.0300
0.0340
2.0
1.0
1.5
0.0496
0.0463
0.0496
0.57
0.75
0.53
Bottomless Arch
CMP
90o headwall
Mitered to slope
Thin wall projecting
1 0.0083
0.0300
0.0340
2.0
2.0
1.5
0.0379
0.0463
0.0496
0.69
0.75
0.57
*Source: FHWA HDS No. 5
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 418
3.4.2.6 Outlet Control Analysis
Nomographs such as those provided in Figure III-3-31 and Figure III-3-32 can be used to determine
the outlet control headwater depth at design flow for various types of culverts and inlets. Outlet
control nomographs other than those provided can be found in FHWA HDS No. 5 or the WSDOT
Hydraulic Manual.
The outlet control headwater depth can also be determined using the simple Backwater Analysis
method presented in Section 3.4 for analyzing pipe system capacity. This procedure is summarized
as follows for culverts:
HW = H + TW – LS (equation 13)
where H = Hf + He + Hex
Hf = friction loss (ft) = (V2n2L)/(2.22R1.33)
NOTE: If (Hf+TW-LS) < D, adjust Hf such that (Hf+TW-LS) = D. This will keep the analysis
simple and still yield reasonable results (erring on the conservative side).
He = entrance head loss (ft) = Ke(V2/2g)
Hex = exit head loss (ft) = V2/2g
TW = tailwater depth above invert of culvert outlet (ft)
NOTE: If TW < (D+dc)/2, set TW = (D+dc)/2. This will keep the analysis simple and still yield
reasonable results.
L = length of culvert (ft)
S = slope of culvert barrel (ft/ft)
D = interior height of culvert barrel (ft)
V = barrel velocity (fps)
n = Manning’s roughness coefficient from Table III-3-19
R = hydraulic radius (ft)
Ke = entrance loss coefficient (from Table III-3-24)
G = acceleration due to gravity (32.2 ft/sec2)
dc = critical depth (ft); see Figure III-3-33
NOTE: The above procedure should not be used to develop stage/discharge curves for level
pool routing purposes because its results are not precise for flow conditions where the
hydraulic grade line falls significantly below the culvert crown (i.e., less than full flow
conditions).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 419
Figure III-3-30. Junction Head Loss in Structures
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 420
Figure III-3-31. Head for Culverts (Pipe W/”N”=0.012) Flowing Full with Outlet Control
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 421
Figure III-3-32. Head for Culverts (Pipe W/”N”=0.024) Flowing Full with Outlet Control
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 422
Figure III-3-33. Critical Depth of Flow for Circular Culverts
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 423
Table III-3-24. Entrance Loss Coefficients
Type of Structure and Design Entrance Coefficient, Ke
Pipe, Concrete, PVC, Spiral Rib, DI, and LCPE
Projecting from fill, socket (bell) end
Projecting from fill, square cut end
Headwall, headwall and wingwalls
Socket end of pipe (groove-end)
Square-edge
Rounded (radius = 1/12D)
Mitered to conform to fill slope
End section conforming to fill slope*
Beveled edges, 33.7o or 45o bevels
Side- or slope-tapered inlet
0.2
0.5
0.2
0.5
0.2
0.7
0.5
0.2
0.2
Pipe, Pipe-Arch, Corrugated Metal and Other Non-Concrete or D.I.
Projecting from fill (no headwall)
Headwall, or headwall and wingwalls (square-edge)
Mitered to conform to fill slope (paved or unpaved slope)
End section conforming to fill slope*
Beveled edges, 33.7o or 45o bevels
Side- or slope-tapered inlet
0.9
0.5
0.7
0.5
0.2
0.2
Box, Reinforced Concrete
Headwall parallel to embankment (no wingwalls)
Square-edged on 3 edges
Rounded on 3 edges to radius of 1/12 barrel dimension
or beveled edges on 3 sides
Wingwalls at 30o to 75o to barrel
Square-edged at crown
Crown edge rounded to radius of 1/12 barrel
dimension or beveled top edge
Wingwall at 10o to 25o to barrel
Square-edged at crown
Wingwalls parallel (extension of sides)
Square-edged at crown
Side- or slope-tapered inlet
0.5
0.2
0.4
0.2
0.5
0.7
0.2
NOTE: “End section conforming to fill slope” are the sections commonly available from
manufacturers. From limited hydraulic tests they are equivalent in operation to a headwall in
both inlet and outlet control. Some end sections incorporating a closed taper in their
design have a superior hydraulic performance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 424
3.4.2.7 Inlets and Outlets
All inlets and outlets in or near roadway embankments must be flush with and conforming to the
slope of the embankments.
• For culverts 18-inch diameter and larger, the embankment around the culvert inlet
shall be protected from erosion by rock lining or riprap as specified in Table III-3-
27, except the length shall extend at least 5 feet upstream of the culvert, and the
height shall be at or above the design headwater elevation.
• Inlet structures, such as concrete headwalls, may provide a more economical
design by allowing the use of smaller entrance coefficients and, hence, smaller
diameter culverts. When properly designed, they will also protect the embankment
from erosion and eliminate the need for rock lining.
• In order to maintain the stability of roadway embankments, concrete headwalls,
wingwalls, or tapered inlets and outlets may be required if right-of-way or easement
constraints prohibit the culvert from extending to the toe of the embankment slopes.
All inlet structures or headwalls installed in or near roadway embankments must be
flush with and conforming to the slope of the embankment.
• Debris barriers (trash racks) are required on the inlets of all culverts that are over
60 feet in length and are 12 to 36 inches in diameter. This requirement also applies
to the inlets of pipe systems. See Figure III-3-27 for a debris barrier detail.
Exceptions are culverts on Type 1 or 2 streams.
• For culverts 18-inch diameter and larger, the receiving channel of the outlet shall be
protected from erosion by rock lining specified in Table III-3-27, except the height
shall be one foot above maximum tailwater elevation or one foot above the crown per
Figure III-3-41, whichever is higher.
3.4.3 Open Channels
This section presents the methods, criteria, and details for hydraulic analysis and design of open
channels.
3.4.3.1 Natural Channels
Natural channels are defined as those that have occurred naturally due to the flow of surface waters,
or those that, although originally constructed by human activity, have taken on the appearance of a
natural channel including a stable route and biological community. They may vary hydraulically along
each channel reach and should be left in their natural condition, wherever feasible or required, in
order to maintain natural hydrologic functions and wildlife habitat benefits from established
vegetation.
3.4.3.2 Constructed Channels
Constructed channels are those constructed or maintained by human activity and include bank
stabilization of natural channels. Constructed channels shall be either vegetation-lined, rock lined, or
lined with appropriately bioengineered vegetation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 425
• Vegetation-lined channels are the most desirable of the constructed channels
when properly designed and constructed. The vegetation stabilizes the slopes of the
channel, controls erosion of the channel surface, and removes pollutants. The
channel storage, low velocities, water quality benefits, and greenbelt multiple-use
benefits create significant advantages over other constructed channels. The
presence of vegetation in channels creates turbulence, which results in loss of
energy and increased flow retardation; therefore, the design engineer must consider
sediment deposition and scour, as well as flow capacity, when designing the
channel.
• Rock-lined channels are necessary where a vegetative lining will not provide
adequate protection from erosive velocities they may be constructed with riprap,
gabions, or slope mattress linings. The rock lining increases the turbulence, resulting
in a loss of energy and increased flow retardation. Rock lining also permits a higher
design velocity and therefore a steeper design slope than in grass-lined channels.
Rock linings are also used for erosion control at culvert and storm drain outlets,
sharp channel bends, channel confluences, and locally steepened channel sections.
• Bioengineered vegetation lining is a desirable alternative to the conventional
methods of rock armoring. Soil bioengineering is a highly specialized science that
uses living plants and plant parts to stabilize eroded or damaged land. Properly
bioengineering systems are capable of providing a measure of immediate soil
protection and mechanical reinforcement. As the plants grow they produce
vegetative protective cover and a root reinforcing matrix in the soil mantle. This root
reinforcement serves several purposes:
a. The developed anchor roots provide both shear and tensile strength to the soil,
thereby providing protection from the frictional shear and tensile velocity
components to the soil mantle during the time when flows are receding and pore
pressure is high in the saturated bank.
b. The root mat provides a living filter in the soil mantle that allows for the natural
release of water after the high flows have receded.
c. The combined root system exhibits active friction transfer along the length of the
living roots. This consolidates soil particles in the bank and serves to protect the
soil structure from collapsing and the stabilization measures from failing.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 426
3.4.3.3 Design Flows
Design flows for sizing or assessing the capacity of open channels shall be determined using the
hydrologic analysis methods described in this chapter. Single event models as described in Chapter
2 of this volume may be used to determine design flows. In addition, open channel shall meet the
following:
• Open channels shall be designed to provide required conveyance capacity while
minimizing erosion and allowing for aesthetics, habitat preservation, and
enhancement.
• An access easement for maintenance is required along all constructed channels
located on private property. Required easement widths and building setback lines
vary with channel top width.
• The maximum distance from the edge of the adjacent access to the farthest point
shall be eighteen feet (18’).
• Channel cross-section geometry shall be trapezoidal, triangular, parabolic, or
segmental as shown in Figure III-3-34 through Figure III-3-36. Side slopes shall be
no steeper than 3:1 for vegetation-lined channels and 2:1 for rock-lined channels.
• Vegetation-lined channels shall have bottom slope gradients of 6% or less and a
maximum velocity at design flow of 5 fps (see Table III-3-26).
• Rock-lined channels or bank stabilization of natural channels shall be used
when design flow velocities exceed 5 feet per second. Rock stabilization shall be in
accordance with Table III-3-26 or stabilized with bioengineering methods as
described above in “Constructed Channels.”
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 427
PROPERTIES OF DITCHES
DIMENSIONS HYDRAULICS
NO. Side Slopes B H W A WP R R(2/3)
D-1 -- -- 6.5" 5'-0" 1.84 5.16 0.356 0.502
D-1C -- -- 6" 25'-0" 6.25 25.50 0.245 0.392
D-2A 1.5:1 2'-0" 1'-0" 5'-0" 3.50 5.61 0.624 0.731
B 2:1 2'-0" 1'-0" 6'-0" 4.00 6.47 0.618 0.726
C 3:1 2'-0" 1'-0" 8'-0" 5.00 8.32 0.601 0.712
D-3A 1.5:1 3'-0" 1'-6" 7'-6" 7.88 8.41 0.937 0.957
B 2:1 3'-0" 1'-6" 9'-0" 9.00 9.71 0.927 0.951
C 3:1 3'-0" 1'-6" 12'-0" 11.25 12.49 0.901 0.933
D-4A 1.5:1 3'-0" 2'-0" 9'-0" 12.00 10.21 1.175 1.114
B 2:1 3'-0" 2'-0" 11'-0" 14.00 11.94 1.172 1.112
C 3:1 3'-0" 2'-0" 15'-0" 18.00 15.65 1.150 1.098
D-5A 1.5:1 4'-0" 3'-0" 13'-0" 25.50 13.82 1.846 1.505
B 2:1 4'-0" 3'-0" 16'-0" 30.00 16.42 1.827 1.495
C 3:1 4'-0" 3'-0" 22'-0" 39.00 21.97 1.775 1.466
D-6A 2:1 -- 1'-0" 4'-0" 2.00 4.47 0.447 0.585
B 3:1 -- 1'-0" 6'-0" 3.00 6.32 0.474 0.608
D-7A 2:1 -- 2'-0" 8'-0" 8.00 8.94 0.894 0.928
B 3:1 -- 2'-0" 12'-0" 12.00 12.65 0.949 0.965
D-8A 2:1 -- 3'-0" 12'-0" 18.00 13.42 1.342 1.216
B 3:1 -- 3'-0" 18'-0" 27.00 18.97 1.423 1.265
D-9 7:1 -- 1'-0" 14'-0" 7.00 14.14 0.495 0.626
D-10 7:1 -- 2'-0" 28'-0" 28.00 28.28 0.990 0.993
D-11 7:1 -- 3'-0" 42'-0" 63.00 42.43 1.485 1.302
Figure III-3-34. Ditches – Common Section
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 428
Figure III-3-35. Drainage Ditches – Common Sections
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 429
Figure III-3-36. Geometric Elements of Common Sections
Se
c
t
i
o
n
A
r
e
a
A
We
t
t
e
d
p
e
r
i
m
e
t
e
r
P
Hy
d
r
a
u
l
i
c
r
a
d
i
u
s
R
To
p
w
i
d
t
h
W
Hy
d
r
a
u
l
i
c
de
p
t
h
D
Se
c
t
i
o
n
f
a
c
t
o
r
Z by
1.5
y
b
by
b
+
2y
by
b
+
2y
b
+
2zy
2zy
or
zy
y
d
(b
+
z
y
)
y
b
+
2y
b
+
2y
1
+
z
2
zy
2
zy
2y
1+ z
2
2
1 +
z
2
(b
+
z
y
)
y
1
+
z
2
b +
2zy
(b
+
z
y
)
y
1/2
1/8
1/2
[(b
+
z
y
)
y
]
b +
2zy
1.5
1.5
2.5
2.5
1.5
1.50.5
2
2
6Ty
32
2
3A 2y
2
0– si
n
si
n
0 0
˚
d
1/2
0
– s
i
n
si
n
0 0
˚
((
))
d
1/20
(sin
(
˚
˚)
)
y (
d
– y
)
y
2/3
P =
(
T/2)[
2/9
0
(1–
)
d
1/4
2/3
sin
˚
0
d0
˚
1/2
2
1/8
0
(
–
s
i
n
)
d
Ty
T +
(
– 2)r
+
b
+
2y
1 +
z
(
– 2)r
2 +
(
b
+
2r)
y
(1 – zco
t
z)
3T
+
8
y
˚
0
2
4z
z
2
*
y
3T2T
8y
2
2
*
2
(
– 2)r
2 +
(
b
+
2r)
y
b +
2r
+ y
2 (
– 2)r
+
b
+
2y
(
– 2)r
2
2 (b
+
2r)
[(
– 2)r
2 +
(
b
+
2r)
y
]
1
+
x
2 +
1/x l
n
(x +
1
+
x2)]
2
b +
2y
T2
-1
r2
(1 –
zco
t
z)
z
z
T
2
-1
2r
A P
A T
2
2[z(y
– r)
+
r
1 +
z
]
A
A
T
*S
a
t
i
s
f
a
c
t
o
r
y
a
p
p
r
o
x
i
m
a
t
i
o
n
f
o
r
t
h
e
i
n
t
e
r
v
a
l
0
<
x
1,
w
h
e
r
e
x
=
4
y
/
T
.
W
h
e
n
x
>
1
,
u
s
e
t
h
e
e
x
a
c
t
e
x
p
r
e
s
s
i
o
n
T
y
Re
c
t
a
n
g
l
e
b T b
Tra
p
e
z
o
i
d
y
1 z
1z
1
z
1 z
Tria
n
g
l
e
T
y
0
d˚
y
T T Pa
r
a
b
o
l
a
y
Cir
c
l
e
r
r
bT
y
r
Rou
n
d
-
c
o
r
n
e
r
e
d
Re
c
t
a
n
g
l
e
(
y>
r
)
T
y
1
z
1z
Ro
u
n
d
-
b
o
t
t
o
m
e
d
Tria
n
g
l
e
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 430
Table III-3-25. Values of the Roughness Coefficient “n”
Type of Channel and Description
Manning’s
“n”*
(Normal)
Type of Channel and Description
Manning’s
“n”*
(Normal)
I. Constructed Channels II. Natural Streams
a. Earth, straight and uniform II-1 Minor Streams (top width at flood stage <100 ft)
1. Clean, recently completed 0.018 a. Streams on plain
2. Gravel, uniform section, clean 0.025 1. Clean, straight, full stage no rifts or deep pools 0.030
3. With short grass, few weeds 0.027 2. Same as #1, but more stones and weeds 0.035
b. Earth, winding and sluggish 3. Clean, winding, some pools and shoals 0.040
1. No vegetation 0.025 4. Same as #3, but some weeds 0.040
2. Grass, some weeds 0.030 5. Same as #4, but more stones 0.070
3. Dense weeds or aquatic plants in deep
channels
4. Earth bottom and rubble sides
5. Stony bottom and weedy banks
0.035
0.030
0.035
6. Sluggish reaches, weedy deep pools
7. Very weedy reaches, deep pools, or floodways
with heavy stand of timber and underbrush
0.100
0.050
6. Cobble bottom and clean sides 0.040 b. Mountain streams, no vegetation in channel,
banks usually steep, trees and brush along banks
submerged at high stages
c. Rock lined
1. Smooth and uniform
2. Jagged and irregular
0.035
0.040 1. Bottom: gravel, cobbles, and few boulders 0.040
2. Bottom: cobbles with large boulders 0.050
d. Channels not maintained, weeds and brush
uncut
1. Dense weeds, high as flow depth 0.080
2. Clean bottom, brush on sides
3. Same as #2, highest stage of flow
4. Dense brush, high stage
0.050
0.070
0.100
II-2 Floodplains
a. Pasture, no brush
1. Short grass
2. High grass
0.030
0.035
b. Cultivated areas
1. No crop 0.030
2. Mature row crops 0.035
3. Mature field crops 0.040
c. Brush
1. Scattered brush, heavy weeds 0.050
2. Light brush and trees 0.060
3. Medium to dense brush 0.070
4. Heavy, dense brush 0.100
d. Trees
1. Dense willows, straight 0.150
2. Cleared land with tree stumps, no sprouts 0.040
3. Same as #2, but with heavy growth of sprouts 0.060
4. Heavy stand of timber, a few down trees, little
undergrowth, flood stage below branches
0.100
5. Same as #4, but with flood stage reaching
branches
0.120
*Note: These “n“ values are “normal” values for use in analysis of channels. For conservative design for channel capacity, the maximum
values listed in other references should be considered. For channel bank stability, the minimum values should be considered.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 431
Table III-3-26. Channel Protection
Velocity at Design Flow (fps) REQUIRED PROTECTION
Greater than Less than or
equal to Type of Protection Thickness
Minimum Height
Above Design
Water Surface
0
5
Grass lining or bioengineered
lining N/A 0.5 foot
5 8 Rock lining(1) or
bioengineered lining 1 foot 1 foot
8 12 Riprap(2) 2 feet 2 feet
12 20 Slope mattress gabion, etc. Varies 2 feet
(1) Rock Lining shall be reasonable well graded as follows:
Maximum stone size: 12 inches
Median stone size: 8 inches
Minimum stone size: 2 inches
(2) Riprap shall be reasonably well graded as follows:
Maximum stone size: 24 inches
Median stone size: 16 inches
Minimum stone size: 4 inches
Note: Riprap sizing is governed by side slopes on channel, assumed to be approximately 3:1.
3.4.3.4 Conveyance Capacity
There are three acceptable methods of analysis for sizing and analyzing the capacity of open
channels:
• Manning’s equation for preliminary sizing
• Direct Step backwater method
• Standard Step backwater method
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 432
3.4.3.5 Manning’s Equation for Preliminary Sizing
Manning’s equation is used for preliminary sizing of open channel reaches of uniform cross section
and slope (i.e., prismatic channels) and uniform roughness. This method assumes the flow depth (or
normal depth) and flow velocity remain constant throughout the channel reach for a given flow.
The charts in Figure III-3-34 and Figure III-3-35 can be used to obtain graphic solutions of Manning’s
equation for common ditch sections. For conditions outside the range of these charts or for more
precise results, Manning’s equation can be solved directly from its classic forms shown in
Equations 7 and 8 Section 3.4.1.2.
Table III-3-25 provides a reference for selecting the appropriate “n” values for open channels. A
number of engineering reference books, such as Open-Channel Hydraulics by V.T. Chow, may also
be used as guides to select “n” values. Figure III-3-36 contains the geometric elements of common
channel sections useful in determining area A, wetted perimeter WP, and hydraulic radius (R=A/WP).
If flow restrictions raise the water level above normal depth within a given channel reach, a backwater
condition (or non-uniform flow) is said to exist. This condition can result from flow restrictions created
by a downstream culvert, bridge, dam, pond, lake, etc., and even a downstream channel reach
having a higher normal flow depth. If backwater conditions are found to exist for the design flow, a
backwater profile must be computed to verify that the channel’s capacity is still adequate as
designed. The Direct Step or Standard Step backwater methods presented in this section can be
used for this purpose.
3.4.3.6 Direct Step Backwater Method
The Direct Step Backwater Method can be used to compute backwater profiles on prismatic channel
reaches (i.e. reaches having uniform cross section and slope) where a backwater condition or
restriction to normal flow is known to exist. The method can be applied to a series of prismatic
channel reaches in succession beginning at the downstream end of the channel and computing the
profile upstream.
Calculating the coordinates of the water surface profile using the method is an iterative process
achieved by choosing a range of flow depths, beginning at the downstream end, and proceeding
incrementally up to the point of interest or to the point of normal flow depth. This is best accomplished
by the use of a table (see Figure III-3-38) or computer programs.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 433
Figure III-3-37. Open Channel Flow Profile Computation
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 434
Figure III-3-38. Direct Step Backwater Method – Example
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 435
Equating the total head at cross section 1 and 2, the following equation may be written:
xSg
Vyg
VyxS f++=++22
2
2
22
2
1
110 (equation 14)
where, x = distance between cross sections (ft)
y1, y2 = depth of flow (ft at cross sections 1 and 2
V1, V2 = velocity (fps) at cross sections 1 and 2
1, 2 = energy coefficient at cross sections 1 and 2
S0 = bottom slope (ft/ft)
Sf = friction slope = (n2V2)/2.21R1.33)
g = acceleration due to gravity, (32.2 ft/sec2)
If the specific energy E at any one cross-section is defined as follows:
g
VyE2
2
+= (equation 15)
Assuming = 1 = 2 where is the energy coefficient which corrects for the non-uniform distribution
of velocity over the channel cross section, equations 14 and 15 can be combined and rearranged to
solve for x as follows:
)()(
)(
00
12
ffSS
E
SS
EEx -=-
-= (equation 16)
Typically values of the energy coefficient are as follows:
Channels, regular section 1.15
Natural streams 1.3
Shallow vegetated flood fringes (includes channel) 1.75
For a given flow, channel slope, Manning’s “n,” and energy coefficient , together with a beginning
water surface elevation y2, the values of x may be calculated for arbitrarily chosen values of y1. The
coordinates defining the water surface profile are obtained from the cumulative sum of x and
corresponding values of y.
The normal flow depth yn should first be calculated from Manning’s equation to establish the upper
limit of the backwater effect.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 436
3.4.3.7 Standard Step Backwater Method
The Standard Step Backwater Method is a variation of the Direct Step Backwater Method and can be
used to compute backwater profiles on both prismatic and non-prismatic channels. In this method,
stations are established along the channel where cross section data is known or has been
determined through field survey. The computation is carried out in steps from station to station rather
than throughout a given channel reach as is done in the Direct Step method. As a result, the analysis
involves significantly more trial-and-error calculation in order to determine the flow depth at each
station.
3.4.3.8 Computer Applications
There are several different computer programs capable of the iterative calculations involved for these
analyses. The project engineer is responsible for providing information describing how the program
was used, assumptions the program makes and descriptions of all variables, columns, rows,
summary tables, and graphs. The most current version of any software program shall be used for
analysis. Auburn may find specific programs not acceptable for use in design. Please check with
Public Works, to confirm the applicability of a particular program prior to starting design.
3.4.3.9 Riprap Design3
Proper riprap design requires the determination of the median size of stone, the thickness of the
riprap layer, the gradation of stone sizes, and the selection of angular stones, which will interlock
when placed. Research by the U.S. Army Corps of Engineers has provided criteria for selecting the
median stone weight, W50 (Figure III-3-39). If the riprap is to be used in a highly turbulent zone (such
as at a culvert outfall, downstream of a stilling basin, at sharp changes in channel geometry, etc.), the
median stone W50 should be increased from 200% to 600% depending on the severity of the locally
high turbulence. The thickness of the riprap layer should generally be twice the median stone
diameter (D50) or at least equivalent to the diameter of the maximum stone. The riprap should have a
reasonably well-graded assortment of stone sizes within the following gradation:
1.25 D max/D50 1.50
D15/D50 = 0.50
Dmin/D50 = 0.25
Riprap Filter Design
Riprap should be underlain by a sand and gravel filter (or filter fabric) to keep the fine materials in the
underlying channel bed from being washed through the voids in the riprap. Likewise, the filter
material must be selected so that it is not washed through the voids in the riprap. Adequate filters can
usually be provided by a reasonably well graded sand and gravel material where:
D15 < 5d85
3 From a paper prepared by M. Schaefer, Dam Safety Section, Washington State Department of Ecology.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 437
The variable d85 refers to the sieve opening through which 85% of the material being protected will
pass, and D15 has the same interpretation for the filter material. A filter material with a D50 of 0.5 mm
will protect any finer material including clay. Where very large riprap is used, it is sometimes
necessary to use two filter layers between the material being protected and the riprap.
Example:
What embedded riprap design should be used to protect a streambank at a level culvert outfall where
the outfall velocities in the vicinity of the downstream toe are expected to be about 8 fps.
From Figure III-3-39, W50 = 6.5 lbs, but since the downstream area below the outfall will be subjected
to severe turbulence, increase W50 by 400% so that:
W50 = 26 lbs, D50 = 8.0 inches
The gradation of the riprap is shown in Figure III-3-40, and the minimum thickness would be 1 foot
(from Table III-3-26); however, 16 inches to 24 inches of riprap thickness would provide some
additional insurance that the riprap will function properly in this highly turbulent area.
Figure III-3-40 shows that the gradation curve for ASTM C33, size number 57 coarse aggregate
(used in concrete mixes), would meet the filter criteria. Applying the filter criteria to the coarse
aggregate demonstrates that any underlying material whose gradation was coarser than that of
concrete sand would be protected.
For additional information and procedures for specifying filters for riprap, refer to the Army Corps of
Engineers Manual EM 1110-2-1601 (1970), Hydraulic Design of Flood Control Channels,
Paragraph 14, “Riprap Protection.”
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 438
Figure III-3-39. Mean Channel Velocity vs Medium Stone Weight (W50)
and Equivalent Stone Diameter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 439
Figure III-3-40. Riprap Gradation Curve
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 440
3.5 Outfalls Systems
This section presents the methods, criteria and details for analysis and design of outfall systems.
Properly designed outfalls are critical to reducing the chance of adverse impacts as the result of
concentrated discharges from pipe systems and culverts, both onsite and downstream. Outfall
systems include rock splash pads, flow dispersal trenches, gabion or other energy dissipaters, and
tightline systems. A tightline system is typically a continuous length of pipe used to convey flows
down a steep or sensitive slope with appropriate energy dissipation at the discharge end.
3.5.1 Outfall Design Criteria
All outfalls must be provided with an appropriate outlet / energy dissipation structure such as a
dispersal trench, gabion outfall, or rock splash pad (see Figure III-3-41) as specified below and in
Table III-3-27.
No erosion or flooding of downstream properties shall result from discharge from an outfall.
Table III-3-27. Rock Protection at Outfalls
Required Protection Discharge Velocity
at Design Flow in
feet per second
(fps) Minimum Dimensions
Type Thickness Width Length Height
0 – 5 Rock lining(1) 1 foot Diameter
+ 6 feet
8 feet or
4 x diameter,
whichever is
greater
Crown
+ 1 foot
>5 - 10 Riprap(2) 2 feet Diameter
+ 6 feet or
3 x diameter,
whichever is greater
12 feet or
4 x diameter,
whichever is
greater
Crown
+ 1 foot
>10 - 20 Gabion
outfall
As
required
As required As required Crown
+ 1 foot
>20 Engineered
energy
dissipater
required
1 Rock lining shall be quarry spalls with gradation as follows:
Passing 8-inch square sieve: 100%
Passing 3-inch square sieve: 40 to 60% maximum
Passing ¾-inch square sieve: 0 to 10% maximum
2 Riprap shall be reasonably well graded with gradation as follows:
Maximum stone size: 24 inches (nominal diameter)
Median stone size: 16 inches
Minimum stone size: 4 inches
Riprap sizing is based on outlet channel side slopes of approximately 3:1.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 441
3.5.1.1 Energy dissipation
• For freshwater outfalls with a design velocity greater than 10 fps, a gabion dissipater or
engineered energy dissipater may be required. The gabion outfall detail shown in
Figure III-3-44 is illustrative only. A design engineered to specific site conditions must
be developed.
• Engineered energy dissipaters, including stilling basins, drop pools, hydraulic jump
basins, baffled aprons, and bucket aprons, are required for outfalls with design velocity
greater than 20 fps. These should be designed using published or commonly known
techniques found in such references as Hydraulic Design of Energy Dissipaters for
Culverts and Channels, published by the Federal Highway Administration of the United
States Department of Transportation; Open Channel Flow, by V.T. Chow; Hydraulic
Design of Stilling Basins and Energy Dissipaters, EM 25, Bureau of Reclamation
(1978); and other publications, such as those prepared by the Soil Conservation
Service (now Natural Resource Conservation Service).
• Alternate mechanisms may be allowed with written approval of The City. Alternate
mechanisms shall be designed using sound hydraulic principles with consideration of
ease of construction and maintenance.
• Mechanisms that reduce velocity prior to discharge from an outfall are encouraged.
Some of these are drop manholes and rapid expansion into pipes of much larger size.
Other discharge end features may be used to dissipate the discharge energy. An
example of an end feature is the use of a Diffuser Tee with holes in the front half, as
shown in Figure III-3-45.
The in-stream sample gabion mattress energy dissipater may not be acceptable within the ordinary
high water mark of fish-bearing waters or where gabions will be subject to abrasion from upstream
channel sediments. A gabion basket located outside the ordinary high water mark should be
considered for these applications.
3.5.1.2 Flow dispersion
• The flow dispersal trenches shown in Figure III-3-42 and Figure III-3-43 shall not be
used unless both criteria below are met:
o An outfall is necessary to disperse concentrated flows across uplands where
no conveyance system exists and the natural (existing) discharge is
unconcentrated; and
o The 100-year peak discharge rate is less than or equal to 0.5 cfs.
• Flow dispersion may be allowed for discharges greater than 0.5 cfs, providing that
adequate design details and calculations for the dispersal trench to demonstrate that
discharge will be sheet flow are submitted and approved by The City.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 442
• For the dispersion trenches shown in Figure III-3-42 and Figure III-3-43, a vegetated
flowpath of at least 25 feet in length must be maintained between the outlet of the
trench and any property line, structure, stream, wetland, or impervious surface. A
vegetated flowpath of at least 50 feet in length must be maintained between the outlet
of the trench and any steep slope. Sensitive area buffers may count towards flowpath
lengths. For dispersion trenches discharging more than 0.5 cfs, additional vegetated
flow path may be required.
• All dispersions systems shall be at least 10 feet from any structure or property line. If
necessary, setbacks shall be increased from the minimum 10 feet in order to maintain
a 1H:1V side slope for future excavation and maintenance.
• Dispersion systems shall be setback from sensitive areas, steep slopes, slopes 20% or
greater, landslide hazard areas, and erosion hazard areas as governed by the Auburn
City Code or as outlined in this manual, whichever is more restrictive.
• For sites with multiple dispersion trenches, a minimum separation of 10 feet is required
between flowpaths. The City may require a larger separation based upon site
conditions such as slope, soil type and total contributing area.
• Runoff discharged towards landslide hazard areas must be evaluated by a
geotechnical engineer or a licensed geologist, hydrogeologist, or engineering
geologist. The discharge point shall not be placed on or above slopes 20% (5H:1V) or
greater or above erosion hazard areas without evaluation by a geotechnical engineer
or qualified geologist and City approval.
Please refer to the Auburn City Code for additional requirements. ACC 16.10 Critical Areas may
contain additional requirements depending upon the project proposal. A Hydraulic Project
Approval (Chapter 77.55 RCW) and an Army Corps of Engineers permit may be required for any
work within the ordinary high water mark.
Other provisions of that RCW or the Hydraulics Code - Chapter 220-110 WAC may also apply.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 443
Figure III-3-41. Pipe/Culvert Outfall Discharge Protection
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 444
Figure III-3-42. Flow Dispersal Trench
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 445
Figure III-3-43. Alternative Flow Dispersal Trench
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 446
Figure III-3-44. Gabion Outfall Detail
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 447
Figure III-3-45. Diffuser TEE (an example of energy dissipating end feature)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 448
3.5.2 Tightline Systems
• Outfall tightlines may be installed in trenches with standard bedding on slopes up to
20%. In order to minimize disturbance to slopes greater than 20%, it is
recommended that tightlines be placed at grade with proper pipe anchorage and
support.
• High density polyethylene pipe (HDPP) tightlines must be designed to address the
material limitations, particularly thermal expansion and contraction and pressure
design, as specified by the manufacturer.
• Due to the ability of HDPP tightlines to transmit flows of very high energy, special
consideration for energy dissipation must be made. Details of a sample gabion
mattress energy dissipater have been provided as Figure III-3-44. Flows of very high
energy will require a specifically engineered energy dissipater structure.
• Tightline systems may be needed to prevent aggravation or creation of a
downstream erosion problem.
• Tightline systems shall have appropriate anchoring designed, both along the slope
and to provide anchoring for the entire system.
3.5.3 Habitat Considerations
• New pipe outfalls can provide an opportunity for low-cost fish habitat improvements.
For example, an alcove of low-velocity water can be created by constructing the pipe
outfall and associated energy dissipater back from the stream edge and digging a
channel, over widened to the upstream side, from the outfall to the stream.
Overwintering juvenile and migrating adult salmonids may use the alcove as shelter
during high flows. Potential habitat improvements should be discussed with the
Washington Department of Fish and Wildlife biologist prior to inclusion in design.
• Bank stabilization, bioengineering and habitat features may be required for disturbed
areas.
• Outfall structures should be located where they minimize impacts to fish, shellfish, and
their habitats.
• The City’s Critical Area Code may regulate activities in these areas.
3.6 Pump Systems
Pump systems are only allowed if applied for through the City’s Exceptions process (see Volume I,
Section 3.5). Feasibility of all other methods of gravity conveyance, infiltration and dispersion shall
first be investigated and demonstrated to be infeasible in the following order of preference:
1. Infiltration of surface water on-site.
2. Dispersion of surface water on site.
3. Gravity connection to the City storm drainage system.
4. Pumping to a gravity system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 449
3.6.1 Design Criteria
If approved by the City Exceptions process (see Volume I, Section 3.5), the pump system must
convey, at a minimum, the peak design flow for the 25-year 24-hour rainfall event. Pump capacity
plus system storage or overflow, must convey or store the 100-year, 24-hour storm event.
3.6.2 Pump Requirements
If approved by the City Exemptions/Variance process, proposed pump systems must meet the
following minimum requirements:
• The pump system shall be used to convey water from one location or elevation to
another within the project site.
• The gravity-flow components of the drainage system to and from the pump system
must be designed so that pump failure does not result in flooding of a building or
emergency access or overflow to a location other than the natural discharge point for
the project site.
• The pump system must have a dual pump (alternating) equipped with emergency
back-up power OR a single pump may be provided without back-up power if the
design provides the 100-year 24-hour storage volume.
• Pumps, wiring, and control systems shall be intrinsically safe per IBC requirements.
• All pump systems must be equipped with an external pump failure and high water
alarm system.
• The pump system will serve only one lot or business owner.
• The pump system must be privately owned and maintained.
• The pump system shall not be used to circumvent any other City drainage
requirements. Construction and operation of the pump system shall not violate any
City requirements.
3.6.3 Additional Requirements
Private pumped stormwater systems will require the following additional items:
• Operations and Maintenance Manual describing the system itself and all required
maintenance and operating instructions, including procedures to follow in the event of
a power outage. All the requirements of Volume I, Section 4.1 shall be included in the
O&M manual.
• Notice to Title on the property outlining that a private stormwater system is constructed
on the site and that the maintenance of that system is the responsibility of the property
owner. Wording of the Notice to Title shall be approved by the City prior to placing the
Notice.
• Operations and Maintenance Agreement signed by the property owner and the City.
After signature by the city, the agreement shall be recorded with the appropriate
County and listed in the Notice of Title with the recording number.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 450
All fees associated with preparing and recording documents and placing the Notice to Title shall be
the responsibility of the applicant.
3.6.4 Sump Pumps
The above pump requirements do not apply to internal sump pumps. However, internal sump pumps
do require a permit prior to connection to the City storm drainage system.
• Sump pumps shall be sized to properly remove water from basements and crawl
spaces.
• Sump pumps shall NOT be connected to the sanitary sewer system.
• Consult the pump manufacturer or an engineer for appropriate sizing of a sump
pump.
3.7 Easements and Access
All publicly owned, manmade drainage facilities and conveyances and all natural channels on the
project site used for conveyance of altered flows due to development (including swales, ditches,
stream channels, lake shores, wetlands, potholes, estuaries, gullies, ravines, etc.) shall be located
within easements as required by the City.
3.7.1 Public Easements
A stormwater easement is required for the placement, operation and maintenance of facilities upon
private property.
Public stormwater easements shall meet the following requirements:
• Public stormwater easements shall extend a minimum of seven and one-half feet (7 ½’) to
each side of the centerline of the storm pipe and seven and one-half (7 ½’) beyond the
outside extremity of a storm facility. Additional width may be required depending upon the
depth and site topography.
• Public stormwater easements shall be provided on the City’s standard easement form. Legal
description of the easement and the property that the easement encumbers, along with a
sketch showing both, shall be sealed by a licensed Land Surveyor and incorporated into the
easement form as exhibits. The legal descriptions and sketch shall be on plain bond paper
with margins acceptable to the County recording.
• Public stormwater easements shall be reviewed by the City and then recorded in the
appropriate County prior to acceptance of the public storm system.
All pipes and channels must be located within the easement so that each pipe face or top edge of
channel is no closer than 5 feet from its adjacent easement boundary. Pipes greater than 5 feet in
diameter and channels with top widths greater than 5 feet shall be placed in easements adjusted
accordingly, so as to meet the required dimensions from the easement boundaries.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Conveyance System Design Volume III
and Hydraulic Analysis Chapter 3 451
The depth or proximity of steep slopes to the public system may necessitate a larger easement
requirement for future excavation and maintenance purposes. See Table III-3-28 for appropriate
widths based on depth of pipe.
Table III-3-28. Additional Storm Drain Easement Widths
INVERT DEPTH WIDTH
< 10’ 20’
10’ - 15’ 25’
15’ - 20’ 30’
> 20’ 40’
Notes:
1. Greater width may be required for large diameter pipe or unfavorable site conditions.
2. Pipe shall be installed in center of easement.
3. If two pipes are to be installed in an easement, add 10 feet to the easement widths listed above. Use the deeper
of the two pipes in selecting the easement width from this table. Install pipes with 10 feet of horizontal clearance
between them.
3.7.2 Private Easements
Privately owned facilities shall be located in separate easements outside of dedicated public road
right-of-way areas. Private systems serving multiple lots require prior City approval.
• A separate storm drainage detention or retention system is required for each commercial or
industrial lot unless a combined storm drainage system is used for more than one lot. In such
cases, a private cross drainage easement and maintenance agreement is required for each
lot, unless cross drainage requirements are set up as a condition of the recorded final plat.
Copies of the recorded easements or plat condition, including the stormwater pollution
prevention plan must be provided to the City prior to civil plan approval.
• All projects shall execute with the City a standard Stormwater Easement and Maintenance
Agreement for the site’s private storm drainage facilities. The easement shall be approved by
the City and executed by the owner prior to issuance of occupancy permits for the
development.
3.7.3 Maintenance Access
A minimum 15-foot wide access easement shall be provided to drainage facilities from a public street
or right-of-way. Access easements shall be surfaced with a minimum 12-foot width of crushed rock,
or other approved surface to allow year-round equipment access to the facility.
Maintenance access must be provided for all manholes, catch basins, vaults, or other underground
drainage facilities operated by the City. Maintenance shall be through a public easement.
Maintenance access to privately maintained facilities may also be required.
THIS PAGE INTENTIONALLY LEFT BLANK.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Auburn Design Storm Volume III
Appendix A 453
Appendix A Auburn Design Storm
Table III-A-29. Design Storm Precipitation Values
Return Frequency
24-Hour Storm Event (Years)
Precipitation
(Inches)
0.5 1.44
2 2.0
5 2.5
10 3.0
25 3.5
50 3.5
100 4.0
The depth of a 7-day, 100-year storm can be determined in one of three ways:
Use 12 inches for the lowland areas between sea level and 650 MSL.
Use the U.S. Department of Commerce Technical Paper No. 49, “Two- to Ten-Day
Precipitation for Return Periods of 2 to 100 Years in the Contiguous United States.”
Use the U.S. Department of Commerce NOAA Atlas 2, “Precipitation Frequency Atlas of
the Western United States,” Volume IX – Washington, 24-hour, 100-year Isopluvials and
add 6.0 inches to the appropriate isopluvial for the project area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Procedure for Conducting a Volume III
Pilot Infiltration Test Appendix B 454
Appendix B Procedure for Conducting a Pilot
Infiltration Test
The Pilot Infiltration Test (PIT) consists of a relatively large-scale infiltration test to better approximate
infiltration rates for design of stormwater infiltration facilities. The PIT reduces some of the scale
errors associated with relatively small-scale double ring infiltrometer or “stove-pipe” infiltration tests. It
is not a standard test but rather a practical field procedure recommended by Ecology’s Technical
Advisory Committee.
Infiltration Test
• Excavate the test pit to the depth of the bottom of the proposed infiltration facility.
Lay back the slopes sufficiently to avoid caving and erosion during the test.
• The horizontal surface area of the bottom of the test pit should be approximately
100 square feet. For small drainages and where water availability is a problem
smaller areas may be considered as determined by the site professional.
• Accurately document the size and geometry of the test pit.
• Install a vertical measuring rod (minimum 5-ft. long) marked in half-inch
increments in the center of the pit bottom.
• Use a rigid 6-inch diameter pipe with a splash plate on the bottom to convey
water to the pit and reduce side-wall erosion or excessive disturbance of the
pond bottom. Excessive erosion and bottom disturbance will result in clogging of
the infiltration receptor and yield lower than actual infiltration rates.
• Add water to the pit at a rate that will maintain a water level between 3 and 4 feet
above the bottom of the pit. A rotometer can be used to measure the flow rate
into the pit.
A water level of 3 to 4 feet provides for easier measurement and flow stabilization control. However,
the depth should not exceed the proposed maximum depth of water expected in the completed
facility.
Every 15 – 30 min, record the cumulative volume and instantaneous flow rate in gallons per minute
necessary to maintain the water level at the same point (between 3 and 4 feet) on the measuring rod.
Add water to the pit until one hour after the flow rate into the pit has stabilized (constant flow rate)
while maintaining the same pond water level (usually 17 hours).
After the flow rate has stabilized, turn off the water and record the rate of infiltration in inches per hour
from the measuring rod data, until the pit is empty.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Procedure for Conducting a Volume III
Pilot Infiltration Test Appendix B 455
Data Analysis
Calculate and record the infiltration rate in inches per hour in 30 minutes or one-hour increments until
one hour after the flow has stabilized.
Use statistical/trend analysis to obtain the hourly flow rate when the flow stabilizes. This would be the
lowest hourly flow rate.
Apply appropriate correction factors for site heterogeneity, anticipated level of maintenance and
treatment to determine the site-specific design infiltration rate (see Table III-2-9).
Example
The area of the bottom of the test pit is 8.5-ft. by 11.5-ft.
Water flow rate was measured and recorded at intervals ranging from 15 to 30 minutes throughout
the test. Between 400 minutes and 1,000 minutes the flow rate stabilized between 10 and
12.5 gallons per minute or 600 to 750 gallons per hour, or an average of (9.8 + 12.3) / 2 =
11.1 inches per hour.
Applying a correction factor of 5.5 for gravelly sand in Table III-2-9 the design long-term infiltration
rate becomes 2 inches per hour, anticipating adequate maintenance and pre-treatment.
THIS PAGE INTENTIONALLY LEFT BLANK.
Volume IV
i Table of Contents
Volume IV –
Source Control
Best Management Practices
Table of Contents
Purpose of this Volume...................................................................................................................457
Content and Organization of this Volume.......................................................................................457
Chapter 1 Frequently Asked Questions...........................................................................458
1.1 Applicability............................................................................................................................458
1.2 Pollutants of Concern............................................................................................................458
1.2.1 pH....................................................................................................................................458
1.2.2 Total Suspended Solids..................................................................................................458
1.2.3 Oils and Greases............................................................................................................458
1.2.4 Oxygen-demanding Substances.....................................................................................458
1.2.5 Metals..............................................................................................................................459
1.2.6 Bacteria and Viruses.......................................................................................................459
1.2.7 Nutrients..........................................................................................................................459
1.2.8 Toxic Organic Compounds.............................................................................................459
1.2.9 Other Chemicals and Substances..................................................................................459
1.3 Types of Source Control BMPs.............................................................................................460
1.3.1 Operational BMPs...........................................................................................................460
1.3.2 Structural BMPs..............................................................................................................460
Chapter 2 Worksheet for Commercial and Industrial Activities.....................................461
Chapter 3 BMPs for Homeowners....................................................................................465
3.1 Automobile Washing (for Single-Family Residences)...........................................................465
3.1.1 Suggested BMPs............................................................................................................465
3.1.1.1 At Home................................................................................................................465
3.1.1.2 Away from Home...................................................................................................466
3.2 Automobile Maintenance.......................................................................................................466
3.2.1 Required BMPs...............................................................................................................466
3.2.2 Suggested BMPs............................................................................................................466
3.3 Storage of Solid Wastes and Food Wastes...........................................................................467
3.3.1 Suggested BMPs............................................................................................................467
Volume IV
ii Table of Contents
3.4 Composting............................................................................................................................467
3.4.1 Suggested BMPs............................................................................................................467
3.5 Yard Maintenance and Gardening........................................................................................468
3.5.1 Required BMPs...............................................................................................................468
3.5.2 Suggested BMPs............................................................................................................468
3.6 Swimming Pool and Spa Cleaning and Maintenance...........................................................469
3.6.1 Required BMPs...............................................................................................................469
3.6.2 Suggested BMPs............................................................................................................469
3.7 Household Hazardous Material Use, Storage, and Disposal................................................469
3.7.1 Required BMPs...............................................................................................................470
3.7.2 Suggested BMPs............................................................................................................470
3.8 General Home Maintenance..................................................................................................471
3.8.1 Suggested BMPs............................................................................................................471
3.9 Pet Waste..............................................................................................................................471
3.9.1 Suggested BMPs............................................................................................................471
Chapter 4 BMPs for Commercial and Industrial Activities..............................................472
4.1 BMPs to Consider for all Activities........................................................................................472
4.2 Cleaning and Washing Activities...........................................................................................473
4.2.1 BMP A101: Cleaning or Washing of Tools, Engines and Manufacturing Equipment....473
4.2.1.1 Description of Pollutant Sources...........................................................................473
4.2.1.2 Pollutant Control Approach...................................................................................473
4.2.1.3 Required BMPs.....................................................................................................473
4.2.1.4 Recommended BMPs...........................................................................................474
4.2.2 BMP A102: Cleaning or Washing of Cooking Equipment...............................................476
4.2.2.1 Description of Pollutant Sources...........................................................................476
4.2.2.2 Pollutant Control Approach...................................................................................476
4.2.2.3 Required BMPs.....................................................................................................476
4.2.2.4 Recommended BMPs...........................................................................................477
4.2.3 BMP A103: Washing, Pressure Washing and Steam Cleaning of
Vehicles/Equipment/Building Structures......................................................................................478
4.2.3.1 Description of Pollutant Sources...........................................................................478
4.2.3.2 Pollutant Control Approach...................................................................................478
4.2.3.3 Required BMPs:....................................................................................................478
4.2.3.4 General..................................................................................................................480
4.2.4 BMP A104: Collection and Disposal of Wastewater in Mobile Interior Washing
Operations.......................................................................................................................481
4.2.4.1 Description of Pollutant Sources...........................................................................481
4.2.4.2 Pollutant Control Approach...................................................................................481
4.2.4.3 Required BMPs.....................................................................................................481
4.2.4.4 Recommended BMPs...........................................................................................482
Volume IV
iii Table of Contents
4.3 Transfer of Liquid or Solid Materials......................................................................................483
4.3.1 BMP A201: Loading and Unloading Areas for Liquid or Solid Material..........................483
4.3.1.1 Description of Pollutant Sources...........................................................................483
4.3.1.2 Pollutant Control Approach...................................................................................483
4.3.1.3 Required BMPs.....................................................................................................483
4.3.1.4 Recommended BMPs:..........................................................................................486
4.3.2 BMP A202: Fueling at Dedicated Stations......................................................................488
4.3.2.1 Description of Pollutant Sources...........................................................................488
4.3.2.2 Pollutant Control Approach...................................................................................488
4.3.2.3 Required BMPs:....................................................................................................488
4.3.3 BMP A203: Vehicle Maintenance Activities....................................................................494
4.3.3.1 Description of Pollutant Sources...........................................................................494
4.3.3.2 Pollutant Control Approach...................................................................................494
4.3.3.3 Required BMPs.....................................................................................................494
4.3.3.4 Recommended BMPs...........................................................................................495
4.3.4 BMP A204: Mobile Fueling of Vehicles and Heavy Equipment......................................496
4.3.4.1 Description of Pollutant Sources...........................................................................496
4.3.4.2 Pollutant Control Approach...................................................................................496
4.3.4.3 Required BMPs.....................................................................................................496
4.4 Production and Application Activities....................................................................................499
4.4.1 BMP A301: Concrete and Asphalt Mixing and Production at Stationary Sites...............499
4.4.1.1 Description of Pollutant Sources...........................................................................499
4.4.1.2 Pollutant Control Approach...................................................................................499
4.4.1.3 Required BMPs.....................................................................................................499
4.4.1.4 Recommended BMPs...........................................................................................500
4.4.2 BMP A302: Concrete Pouring, Concrete Cutting, and Asphalt Application at
Temporary Sites..............................................................................................................501
4.4.2.1 Description of Pollutant Sources...........................................................................501
4.4.2.2 Pollutant Control Approach...................................................................................501
4.4.2.3 Required BMPs.....................................................................................................501
4.4.2.4 Recommended BMPs...........................................................................................502
4.4.3 BMP A303: Manufacturing and Post-Processing of Metal Products..............................503
4.4.3.1 Description of Pollutant Sources...........................................................................503
4.4.3.2 Pollutant Control Approach...................................................................................503
4.4.3.3 Required BMPs.....................................................................................................503
4.4.3.4 Recommended BMPs...........................................................................................504
4.4.4 BMP A304: Wood Treatment Areas................................................................................505
4.4.4.1 Description of Pollutant Sources...........................................................................505
4.4.4.2 Pollutant Control Approach...................................................................................505
4.4.4.3 Required BMPs.....................................................................................................505
4.4.4.4 Recommended BMP.............................................................................................506
Volume IV
iv Table of Contents
4.4.5 BMP A305: Commercial Composting.............................................................................507
4.4.5.1 Description of Pollutant Sources...........................................................................507
4.4.5.2 NPDES Permit Requirements...............................................................................507
4.4.5.3 Pollutant Control Approach...................................................................................507
4.4.5.4 Required BMPs.....................................................................................................507
4.4.5.5 Recommended BMPs...........................................................................................508
4.4.6 BMP A306: Landscaping and Lawn/Vegetation Management.......................................509
4.4.6.1 Description of Pollutant Sources...........................................................................509
4.4.6.2 Pollutant Control Approach...................................................................................509
4.4.6.3 Required BMPs for Landscaping..........................................................................509
4.4.6.4 Recommended BMPs for Landscaping.................................................................509
4.4.6.5 Required BMPs for the Use of Pesticides.............................................................510
4.4.6.6 Recommended BMPs for the use of Pesticides....................................................511
4.4.6.7 Required BMPs for Vegetation Management.......................................................512
4.4.6.8 Fertilizer Management:..........................................................................................512
4.4.6.9 Integrated Pest Management................................................................................513
4.4.7 BMP A307: Painting, Finishing and Coating of Vehicles, Boats, Buildings and
Equipment....................................................................................................................................514
4.4.7.1 Description of Pollutant Sources...........................................................................514
4.4.7.2 Pollutant Control Approach...................................................................................514
4.4.7.3 Required BMPs.....................................................................................................514
4.4.7.4 Recommended BMPs...........................................................................................515
4.4.8 BMP A308: Commercial Printing Operations..................................................................516
4.4.8.1 Description of Pollutant Sources...........................................................................516
4.4.8.2 Pollutant Control Approach...................................................................................516
4.4.8.3 Required BMPs.....................................................................................................516
4.4.8.4 Recommended BMPs...........................................................................................516
4.4.9 BMP A309: Manufacturing Operations – Outside...........................................................517
4.4.9.1 Description of Pollutant Sources...........................................................................517
4.4.9.2 Pollution Control Approach...................................................................................517
4.4.9.3 Required BMPs.....................................................................................................517
4.5 Storage and Stockpiling Activities.........................................................................................519
4.5.1 BMP A401: Storage or Transfer (Outside) of Solid Raw Materials, By-Products or
Finished Products........................................................................................................................519
4.5.1.1 Description of Pollutant Sources...........................................................................519
4.5.1.2 Pollutant Control Approach...................................................................................519
4.5.1.3 Required BMPs.....................................................................................................519
4.5.1.4 Recommended BMPs...........................................................................................520
4.5.2 BMP A402: Storage and Treatment of Contaminated Soils...........................................522
4.5.2.1 Description of Pollutant Sources...........................................................................522
4.5.2.2 Pollutant Control Approach...................................................................................522
4.5.2.3 Required BMPs.....................................................................................................522
4.5.2.4 Recommended BMPs...........................................................................................522
Volume IV
v Table of Contents
4.5.3 BMP A403: Temporary Storage or Processing of Fruits or Vegetables.........................523
4.5.3.1 Description of Pollutant Sources...........................................................................523
4.5.3.2 Pollutant Control Approach...................................................................................523
4.5.3.3 Required BMPs.....................................................................................................523
4.5.3.4 Recommended BMPs...........................................................................................524
4.5.4 BMP A404: Storage of Solid Wastes and Food Wastes.................................................525
4.5.4.1 Description of Pollutant Sources...........................................................................525
4.5.4.2 Pollutant Control Approach...................................................................................525
4.5.4.3 Required BMPs.....................................................................................................525
4.5.4.4 Recommended BMPs...........................................................................................526
4.5.5 BMP A405: Recyclers and Scrap Yards.........................................................................527
4.5.5.1 Description of Pollutant Sources...........................................................................527
4.5.5.2 Required BMPs.....................................................................................................527
4.5.6 BMP A406: Treatment, Storage or Disposal of Dangerous Wastes...............................528
4.5.7 BMP A407: Storage of Liquid, Food Waste or Dangerous Waste Containers...............529
4.5.7.1 Description of Pollutant Sources...........................................................................529
4.5.7.2 Pollutant Control Approach...................................................................................529
4.5.7.3 Required BMPs.....................................................................................................529
4.5.8 BMP A408: Storage of Liquids in Above-Ground Tanks.................................................532
4.5.8.1 Description of Pollutant Sources...........................................................................532
4.5.8.2 Pollutant Control Approach...................................................................................532
4.5.8.3 Required BMPs for All Tanks................................................................................532
4.5.8.4 Required BMPs for Single-walled Tanks...............................................................533
4.5.8.5 Recommended BMPs for Double-walled Tanks...................................................533
4.5.9 BMP A409: Parking and Storage for Vehicles and Equipment.......................................535
4.5.9.1 Description of Pollutant Sources...........................................................................535
4.5.9.2 Required BMPs.....................................................................................................535
4.6 Construction and Demolition Activities..................................................................................536
4.6.1 BMP A501: Clearing, Grading and Preparation of Construction Sites...........................536
4.6.2 BMP A502: Demolition of Buildings................................................................................537
4.6.2.1 Description of Pollutant Sources...........................................................................537
4.6.2.2 Pollutant Control Approach...................................................................................537
4.6.2.3 Required BMPs.....................................................................................................537
4.6.2.4 Recommended BMPs...........................................................................................537
4.6.3 BMP A503: Building, Repair, Remodeling and Construction..........................................538
4.6.3.1 Description of Pollutant Sources...........................................................................538
4.6.3.2 Pollutant Control Approach...................................................................................538
4.6.3.3 Required BMPs.....................................................................................................538
4.6.3.4 Recommended BMPs...........................................................................................539
4.7 Dust Control, and Soil and Sediment Control........................................................................540
Volume IV
vi Table of Contents
4.7.1 BMP A601: Dust Control at Disturbed Land Areas and Unpaved Roadways and
Parking Lots....................................................................................................................540
4.7.1.1 Description of Pollutant Sources...........................................................................540
4.7.1.2 Pollutant Control Approach...................................................................................540
4.7.1.3 Required BMPs.....................................................................................................540
4.7.1.4 Recommended BMPs for Roadways and Other Trafficked Areas:.......................540
4.7.1.5 Recommended BMPs for Dust Generating Areas:...............................................541
4.7.2 BMP A602: Dust Control at Manufacturing Sites............................................................542
4.7.2.1 Description of Pollutant Sources...........................................................................542
4.7.2.2 Pollutant Control Approach...................................................................................542
4.7.2.3 Required BMPs.....................................................................................................542
4.7.2.4 Recommended BMPs...........................................................................................542
4.7.3 BMP A603: Soil Erosion and Sediment Control at Industrial Sites.................................543
4.7.3.1 Description of Pollutant Sources...........................................................................543
4.7.3.2 Pollutant Control Approach...................................................................................543
4.7.3.3 Required BMPs.....................................................................................................543
4.8 Other Activities.......................................................................................................................544
4.8.1 BMP A701: Commercial Animal Handling Areas............................................................544
4.8.1.1 Description of Pollutant Sources...........................................................................544
4.8.1.2 Pollutant Control Approach...................................................................................544
4.8.1.3 Required BMPs.....................................................................................................544
4.8.2 BMP A702: Log Sorting and Handling............................................................................545
4.8.2.1 Description of Pollutant Sources...........................................................................545
4.8.2.2 Ecology’s Baseline General Permit Requirements...............................................545
4.8.3 BMP A703: Boat Building, Maintenance and Repair......................................................546
4.8.3.1 Description of Pollutant Sources...........................................................................546
4.8.3.2 Pollutant Control Approach...................................................................................546
4.8.3.3 Required BMPs.....................................................................................................546
4.8.3.4 Recommended BMPs...........................................................................................547
4.8.4 BMP A704: Logging........................................................................................................549
4.8.4.1 Description of Pollutant Sources...........................................................................549
4.8.4.2 Pollutant Control Approach...................................................................................549
4.8.4.3 Required BMPs.....................................................................................................549
4.8.4.4 Recommended BMPs...........................................................................................550
4.8.5 BMP A705: Mining and Quarrying of Sand, Gravel, Rock, Peat, Clay and
Other Materials................................................................................................................551
4.8.5.1 Description of Pollutant Sources...........................................................................551
4.8.5.2 Recommended BMPs...........................................................................................551
4.8.6 BMP A706: Swimming Pool and Spa Cleaning and Maintenance.................................552
4.8.6.1 Description of Pollutant Sources...........................................................................552
4.8.6.2 Pollutant Control Approach...................................................................................552
4.8.6.3 Required BMPs.....................................................................................................552
4.8.6.4 Recommended BMP.............................................................................................552
Volume IV
vii Table of Contents
4.8.7 BMP A707: De-Icing and Anti-Icing Operations for Streets & Highways........................553
4.8.7.1 Description of Pollutant Sources...........................................................................553
4.8.7.2 Required BMPs.....................................................................................................553
4.8.7.3 Recommended BMPs...........................................................................................553
4.8.8 BMP A708: Roof and Building Drains at Manufacturing and Commercial Buildings......554
4.8.8.1 Description of Pollutant Sources...........................................................................554
4.8.8.2 Pollutant Control Approach...................................................................................554
4.8.8.3 Required BMPs.....................................................................................................554
4.8.9 BMP A709: Urban Streets...............................................................................................555
4.8.9.1 Description of Pollutant Sources...........................................................................555
4.8.9.2 Pollutant Control Approach...................................................................................555
4.8.9.3 Recommended BMPs...........................................................................................555
4.8.10 BMP A710: Railroad Yards.............................................................................................557
4.8.10.1 Description of Pollutant Sources...........................................................................557
4.8.10.2 Pollutant Control Approach...................................................................................557
4.8.10.3 Required BMPs.....................................................................................................557
4.8.11 BMP A711: Maintenance of Public and Utility Corridors and Facilities..........................558
4.8.11.1 Description of Pollutant Sources...........................................................................558
4.8.11.2 Pollutant Control Approach...................................................................................558
4.8.11.3 Required BMPs.....................................................................................................558
4.8.11.4 Recommended BMPs...........................................................................................559
4.8.12 BMP A712: Maintenance of Roadside Ditches...............................................................560
4.8.12.1 Description of Pollutant Sources...........................................................................560
4.8.12.2 Pollutant Control Approach...................................................................................560
4.8.12.3 Required BMPs.....................................................................................................560
4.8.12.4 Recommended BMPs...........................................................................................561
4.8.13 BMP A713: Maintenance of Stormwater Drainage and Treatment Facilities................562
4.8.13.1 Description of Pollutant Sources...........................................................................562
4.8.13.2 Pollutant Control Approach...................................................................................562
4.8.13.3 Required BMPs.....................................................................................................562
4.8.14 BMP A714: Spills of Oil and Hazardous Substances.....................................................564
4.8.14.1 Description of Pollutant Sources...........................................................................564
4.8.14.2 Pollutant Control Approach...................................................................................564
4.8.14.3 Required BMPs.....................................................................................................564
4.8.14.4 Recommended BMPs...........................................................................................565
4.8.15 BMP A715: Water Reservoir, Transmission Mainline, Wellhead, and Hydrant
Flushing Activities...........................................................................................................566
4.8.15.1 Description of Pollutant Sources...........................................................................566
4.8.15.2 Pollutant Control Approach...................................................................................566
4.8.15.3 Required BMPs.....................................................................................................566
4.8.15.4 Recommended BMPs...........................................................................................566
4.8.16 BMP S101: Eliminate Illicit Storm Drainage System Connections.................................568
4.8.17 BMP S102: Dispose of Contaminated Stormwater and Waste Materials Properly........569
Volume IV
viii Table of Contents
4.8.18 BMP S103: Discharge Process Wastewater to a Sanitary Sewer, Holding Tank,
or Water Treatment System............................................................................................570
4.8.19 BMP S108: Implement Integrated Pest Management Measures...................................571
4.8.20 BMP S109: Cleaning Catch Basins................................................................................572
4.9 Cover and Surround Activities...............................................................................................573
4.9.1 BMP S104: Cover the Activity with a Roof or Awning.....................................................573
4.9.2 BMP S105: Cover the Activity with an Anchored Tarp or Plastic Sheet.........................574
4.9.3 BMP S106: Pave the Activity Area and Slope to a Sump, Holding Tank, or
Oil/Water Separator........................................................................................................575
4.9.4 BMP S107: Surround the Activity Area with a Curb, Dike, or Berm or Elevate the
Activity.............................................................................................................................576
Chapter 5 Regulations and Requirements.......................................................................580
5.1 City of Auburn Codes and Ordinances..................................................................................580
5.2 State, Federal, and Other Regulations and Requirements...................................................580
5.2.1 Washington State Department of Ecology Requirements for the Discharge of
Process Wastewaters Directly to Surface Waters..........................................................580
5.2.2 Washington State Department of Ecology Requirements for Dangerous
Waste Generators...........................................................................................................581
5.2.3 Washington State Department of Ecology Stormwater NPDES Permit
Requirements..................................................................................................................581
5.2.4 Washington State Department of Ecology Requirements for Underground and
Above Ground Storage Tanks........................................................................................582
5.2.5 U.S. Environmental Protection Agency and Ecology Emergency Spill Cleanup
Requirements..................................................................................................................582
5.2.6 Washington State Department of Agriculture Pesticide Regulations..............................582
5.2.7 Puget Sound Clean Air Agency Air Quality Regulations.................................................582
Appendix A Quick Reference Phone Numbers...................................................................583
Appendix B Recycling/Disposal of Vehicle Fluids and Other Wastes...............................584
Appendix C Example of an Integrated Pest Management Program (IPM).........................585
Appendix D Recommendations for Management of Street Wastes..................................588
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Purpose Volume IV
Content and Organization Introduction 457
Volume IV:
Source Control Best
Management Practices
Purpose of this Volume
This volume was designed to help businesses, homeowners and public agencies in Auburn
implement source control best management practices (BMPs) to prevent pollutants from
contaminating stormwater runoff and entering our rivers, streams and groundwater.
Content and Organization of this Volume
Volume IV contains five chapters and four appendices.
• Chapter 1 provides an overview of who should use this volume and the type of
pollutants being targeted.
• Chapter 2 provides a worksheet for commercial and industrial activity.
• Chapter 3 provides BMPs for single-family residences.
• Chapter 4 provides BMPs for commercial and industrial activities.
• Chapter 5 lists related regulations and requirements.
• Appendix A provides a list of phone numbers for related agencies.
• Appendix B lists recommended management procedures for the handling of
hazardous wastes.
• Appendix C provides an example of an Integrated Pest Management program.
• Appendix D provides recommendations for the management of street wastes.
Volume
IV
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Frequently Asked Questions Volume IV
Chapter 1 458
Chapter 1 Frequently Asked Questions
1.1 Applicability
The implementation of BMPs applies to all businesses, residences, and public agencies in Auburn.
1.2 Pollutants of Concern
The City is required to show progress in eliminating virtually all non-stormwater discharges to the
storm drainage system. Only uncontaminated stormwater may be discharged to the City of Auburn
storm drainage system. Illicit discharges, intentional or unintentional, are not allowed and polluters
may be subject to state and federal penalties. It is the property owner’s responsibility to keep
pollutants from leaving a property and entering the City storm drainage system.
Pollutants can be placed into several broad categories, as listed below.
1.2.1 pH
The pH value of a substance is a relative measure of whether it is acidic or basic. Most aquatic
species can only survive in neutral conditions. Sources that can contribute to a change in pH of
stormwater and waterbodies include cement in concrete pouring, paving, and recycling operations;
solutions from metal plating; chemicals from printing businesses and other industrial processes; and
household cleaners such as bleaches and deck washes.
1.2.2 Total Suspended Solids
This represents particulate solids such as eroded soil, heavy metal precipitates, and biological solids
which can cause sedimentation in streams and turbidity in receiving surface waters. Sediments can
destroy the desired habitat for fish and can impact drinking water supplies. Sediment may be carried
to streams, rivers and eventually to Puget Sound where they may be toxic to aquatic life and destroy
habitat.
1.2.3 Oils and Greases
Oils and greases can be either petroleum-based or food-related sources. Petroleum-based
compounds can be immediately toxic to fish and wildlife, and can destroy our drinking water aquifers.
Food-based oils and greases can coat fish gills and insects, suffocating them. Oils and greases can
clog conveyance systems, which may cause flooding.
1.2.4 Oxygen-demanding Substances
Degradable organic matter, such as yard, food, and pet wastes, and some chemical wastes, can
have a drastic effect on water quality. These substances, when broken down by bacteria, consume
the oxygen in the water. This stresses and can eventually kill fish and other creatures in the water.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Frequently Asked Questions Volume IV
Chapter 1 459
1.2.5 Metals
Metals are utilized in many products important to our daily lives. Certain metals, known as heavy
metals, wear off of our car brakes and tires, and come from the paint and moss-killing roof strips and
herbicides we use at our homes. These metals can cause severe health and reproductive problems
in fish and animals that live in water. Metals can be transported on sediments to waterbodies.
1.2.6 Bacteria and Viruses
Bacteria and viruses from pet wastes, failing septic systems and agricultural areas can contaminate
drinking water and close down swimming and shellfish areas. A group of bacteria called fecal
coliform bacteria are typically used as the indicators for all bacteria and viruses, so large amounts of
fecal coliform may indicate serious problems.
1.2.7 Nutrients
In the context of water quality, nutrients are mainly compounds of nitrogen and phosphorus. When
nutrients are allowed to enter waterbodies, undesirable effects such as algae overgrowth, oxygen
depletion, channel clogging due to overgrowth of vegetation, and fish and animal death can occur.
Sources of nutrients can include fertilizers, failing septic systems, and yard and animal wastes.
1.2.8 Toxic Organic Compounds
A number of organic chemicals are just plain toxic when they get into the aquatic environment.
Pesticides, herbicides, rodenticides, and fungicides are deadly to aquatic life. Compounds such as
antifreeze, wood preservatives, cleansers, and a host of other, more exotic organics derived from
industries or past practices (such as polychlorinated biphenyls (PCBs), DDT, and chlordane) can also
have detrimental effects on the environment.
1.2.9 Other Chemicals and Substances
There are a host of other chemicals that can cause problems if allowed to enter the aquatic
environment. Common household bleach can be deadly to fish and other critters if drained directly to
waterbodies. Diatomaceous earth backwash from swimming pool filters can clog gills and suffocate
fish. Arsenic has been used in rat and mole killing compounds. Even those compounds classified as
biodegradable or environmentally friendly can have immediate devastating effects on aquatic life.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Frequently Asked Questions Volume IV
Chapter 1 460
1.3 Types of Source Control BMPs
As the name implies, source control BMPs prevent contamination from entering stormwater runoff by
controlling them at the source. There are two categories of source control BMPs:
• Operational BMPs
• Structural BMPs
1.3.1 Operational BMPs
Operational source control BMPs are considered to be the most cost effective pollutant minimization
practices. Operational source control BMPs are non-structural practices that prevent or reduce
pollutants form entering stormwater. They can also include process changes such as raw
material/product changes and recycling wastes.
Examples include:
• Formation of a pollution prevention team
• Good housekeeping practices
• Preventive maintenance procedures
• Spill prevention and cleanup
• Employee training
• Inspections of pollutant sources
• Record keeping
1.3.2 Structural BMPs
Structural source control BMPs are physical, structural or mechanical devices or facilities that are
intended to prevent pollutants from entering stormwater.
Examples of structural source control BMPs typically include:
• Enclosing and/or covering the pollutant source, i.e., within a building or other
enclosure, a roof over storage and working areas, a temporary tarp
• Physically segregating the pollutant source to prevent run-on of uncontaminated
stormwater
• Devices that direct only contaminated stormwater to appropriate treatment BMPs, i.e.
discharge to a sanitary sewer if allowed by the local sewer utility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
1 If any of these activities occur indoors, then BMPs are not required, provided no indoor drains or processes can ultimately
contact stormwater or be transported to surface waters such as rivers and streams. Ensure that liquids, powders, dusts
and fine granular materials stay confined indoors. Otherwise BMPs will be required.
2 If any of these activities occur outdoors, then use the activity code to find the appropriate BMPs described in Chapter 4.
Worksheet for Commercial Volume IV
and Industrial Activities 461 Chapter 2
Chapter 2 Worksheet for Commercial and Industrial
Activities
This worksheet is designed for use by business and industry operators. Complete the entire
worksheet by checking the appropriate boxes for all activities that take place at the work site. If any of
the activities as being performed outdoors, use the activity code on the worksheet to find the
recommended BMPs contained in Chapter 4.
Are you involved in this?
If so, check if it occurs:
Activity
Code
(BMP)
TYPE OF ACTIVITY
Indoors1 Outdoors2
SECTION A1 – CLEANING AND WASHING ACTIVITIES
A101 Cleaning or Washing of Tools, Engines, and Manufacturing
Equipment – includes parts washers and all types of manufactured
equipment components.
A102 Cleaning or Washing of Cooking Equipment – includes vents, filters,
pots and pans, grills, and related items.
A103 Washing, Pressure Washing, and Steam Cleaning of
Vehicles/Equipment/Building Structures – covers cleaning and
washing at all types of establishments, including fleet vehicle yards,
car dealerships, car washes, and maintenance facilities.
A104 Collection and Disposal of Wastewater from Mobile Interior Washing
Operations – includes carpet cleaners, upholstery cleaners, and
drapery cleaners.
SECTION A2 – TRANSFERS OF LIQUID OR SOLID MATERIALS
A201 Loading and Unloading Areas for Liquid or Solid Material – for
loading and unloading of materials at industrial and commercial
facilities
A202 Fueling at Dedicated Stations – includes gas stations, pumps at fleet
vehicle yards or shops, and other privately owned pumps.
A203 Vehicle Maintenance Activities – covers oil changes and other
engine fluids.
A204 Mobile Fueling of Vehicles and Heavy Equipment – includes fleet
fueling, wet fueling, and wet hosing
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
1 If any of these activities occur indoors, then BMPs are not required, provided no indoor drains or processes can ultimately
contact stormwater or be transported to surface waters such as rivers and streams. Ensure that liquids, powders, dusts
and fine granular materials stay confined indoors. Otherwise BMPs will be required.
2 If any of these activities occur outdoors, then use the activity code to find the appropriate BMPs described in Chapter 4.
Worksheet for Commercial Volume IV
and Industrial Activities 462 Chapter 2
Are you involved in this?
If so, check if it occurs:
Activity
Code
(BMP)
TYPE OF ACTIVITY
Indoors1 Outdoors2
SECTION A3 – PRODUCTION AND APPLICATION ACTIVITIES
A301 Concrete and Asphalt Mixing and Production at Stationary Sites –
applies to mixing of raw materials on-site to produce concrete or
asphalt.
A302 Concrete Pouring, Concrete Cutting, and Asphalt Application at
Temporary Sites – includes construction sites, and driveway and
parking lot resurfacing.
A303 Manufacturing and Post-processing of Metal Products – includes
machining, grinding, soldering, cutting, welding, quenching, rinsing,
etc.
A304 Wood Treatment Areas – includes wood treatment using pressure
processes or by dipping or spraying.
A305 Commercial Composting – includes commercial composting facilities
operating outside.
A306 Landscaping and Lawn/Vegetation Maintenance, Including
Vegetation Removal, Herbicide and Insecticide Application, Fertilizer
Application, Irrigation, Watering, Gardening, and Lawn Care –
includes businesses involved in landscaping, applying pesticides
and managing vegetation.
A307 Painting, Finishing, and Coating of Vehicles, Boats, Buildings, and
Equipment – includes surface preparation and the applications of
paints, finishes, and/or coatings.
A308 Commercial Printing Operations – includes materials used in the
printing process.
A309 Manufacturing Activities (Outside) - includes outdoor manufacturing
areas.
SECTION A4 – STORAGE ACTIVITIES
A401 Storage or Transfer (Outside) of Solid Raw Materials, By-products,
or Finished Products
A402 Storage and Treatment of Contaminated Soils – applies to
contaminated soils that are excavated and left on-site.
A403 Temporary Storage or Processing of Fruits or Vegetables – includes
processing activities at wineries, fresh and frozen juice makers, and
other food and beverage processing operations.
A404 Storage of Solid Wastes and Food Wastes – includes regular
garbage and all other discarded non-liquid items.
A405 Recyclers and Scrap Yards – includes scrapped equipment,
vehicles, empty metal drums, and assorted recyclables.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
1 If any of these activities occur indoors, then BMPs are not required, provided no indoor drains or processes can ultimately
contact stormwater or be transported to surface waters such as rivers and streams. Ensure that liquids, powders, dusts
and fine granular materials stay confined indoors. Otherwise BMPs will be required.
2 If any of these activities occur outdoors, then use the activity code to find the appropriate BMPs described in Chapter 4.
Worksheet for Commercial Volume IV
and Industrial Activities 463 Chapter 2
Are you involved in this?
If so, check if it occurs:
Activity
Code
(BMP)
TYPE OF ACTIVITY
Indoors1 Outdoors2
A406 Treatment, Storage, or Disposal of Dangerous Wastes – Refer to
Ecology and the appropriate County Health Department for more
information, see Chapter 6.
A407 Storage of Liquid, Food Waste, or Dangerous Waste Containers –
includes containers located outside a building and used for
temporary storage
A408 Storage of Liquids in Permanent Above-ground Tanks – includes all
liquids in above-ground tanks
A409 Parking and Storage for Vehicles and Equipment – includes public
and commercial parking lots
SECTION A5 – CONSTRUCTION ACTIVITIES
A501 Clearing, Grading, and Preparation of Construction Sites – applies to
land developing activities and to residential yard clearing and
grading projects.
A502 Demolition of Buildings – applies to removal of existing buildings and
subsequent clearing of the rubble.
A503 Building Repair, Remodeling, and Construction – applies to
construction of buildings, general exterior building repair work and
remodeling of buildings.
SECTION A6 – DUST CONTROL AND SOIL AND SEDIMENT CONTROL
A601 Dust Control at Disturbed Land Areas and Unpaved Roadways and
Parking Lots
A602 Dust Control at Manufacturing Sites – includes grain dust, sawdust,
coal, gravel, crushed rock, cement, and boiler fly ash.
A603 Soil Erosion and Sediment Control at Industrial Sites – includes
industrial activities that take place on soil.
SECTION A7 – OTHER ACTIVITIES
A701 Commercial Animal Handling Areas – includes kennels, fenced
pens, veterinarians, and businesses that board animals
A702 Log Sorting and Handling – applies to log yards typically located at
sawmills, ports, and pulp mills.
A703 Boat building, Mooring, Maintenance, and Repair – includes all types
of maintenance, repair, and building operations.
A704 Logging – applies to logging activities that fall under Class IV
general forest practices.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
1 If any of these activities occur indoors, then BMPs are not required, provided no indoor drains or processes can ultimately
contact stormwater or be transported to surface waters such as rivers and streams. Ensure that liquids, powders, dusts
and fine granular materials stay confined indoors. Otherwise BMPs will be required.
2 If any of these activities occur outdoors, then use the activity code to find the appropriate BMPs described in Chapter 4.
Worksheet for Commercial Volume IV
and Industrial Activities 464 Chapter 2
Are you involved in this?
If so, check if it occurs:
Activity
Code
(BMP)
TYPE OF ACTIVITY
Indoors1 Outdoors2
A705 Mining and Quarrying of Sand, Gravel, Minerals, Peat, Clay, Rock,
and Other Materials – does not include excavation at construction
sites.
A706 Swimming Pool and Spa Cleaning and Maintenance – includes
every swimming pool and spa not at a single family residence.
Commercial pool cleaners are included here for all pools.
A707 Deicing and Anti-icing Operations for Airports and Streets -includes
aircraft, runways/taxiways, streets and highways.
A708 Roof and Building Drains at Manufacturing and Commercial
Buildings – These sites will be referred to the Puget Sound Clean Air
Agency.
A709 Urban Streets – includes recommended BMPs.
A710 Railroad Yards
A711 Maintenance of Public and Private Utility Corridors and Facilities –
includes public and private utility maintenance activities.
A712 Maintenance of Roadside Ditches
A713 Maintenance of Stormwater Drainage and Treatment Facilities
A714 Spills of Oil and Hazardous Substances
A715 Water Reservoir, Transmission Mainline, Wellhead, and Hydrant
Flushing Activities
SECTION S1 – SOURCE CONTROL BMPs
S101 Eliminate Illicit Sewer to Storm Drainage System Connections
S102 Dispose of Contaminated Stormwater and Waste Materials Properly
S103 Discharge Process Wastewater to a Sanitary Sewer, Holding Tank,
or Water Treatment System
S104 Cover the Activity with a Roof of Awning
S105 Cover the Activity with an Anchored Tarp or Plastic Sheet
S106 Pave the Activity Area and Slope to a Sump or Holding Tank, or
Oil/Water Generator
S107 Surround the Activity Area with a Curb, Dike, or Berm or Elevate the
Activity
S108 Implement Integrated Pest Management Measures
S109 Cleaning Catch Basins
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 465
Chapter 3 BMPs for Homeowners
Actions taken each day in and around homes have a profound effect on surface water quality and
fish habitat in this region. Stormwater goes directly to rivers, streams and to Puget Sound.
Stormwater does not go to the wastewater treatment plant. Any pollutants that get into the
stormwater go directly to surface water. Small amounts of pollution from many different sources can
significantly affect our waterways. Yard maintenance, waste storage, car washing and maintenance,
and pool cleaning are some of the activities that can adversely impact water quality. The best
management practices (BMPs) discussed in this section are practical ways to keep stormwater from
becoming polluted in the first place. It is recommended that all residents in Auburn use these BMPs.
Please note that some of these procedures are required by various state, or city laws, and are noted
as required BMPs.
A general list of BMPs for homeowners is described in this chapter. Some of the BMPs described in
Chapter 4 may also be applicable to homeowners.
• Section 3.1 – Automobile Washing
• Section 3.2 – Automobile Maintenance
• Section 3.3 – Storage of Solid Wastes and Food Wastes
• Section 3.4 – Composting
• Section 3.5 – Yard Maintenance and Gardening
• Section 3.6 – Swimming Pool and Spa Cleaning and Maintenance
• Section 3.7 – Household Hazardous Material Use, Storage, and Disposal
• Section 3.8 – General Home Maintenance
3.1 Automobile Washing (for Single-Family Residences)
Car washing at home will cause wash water to enter the storm system and flow untreated into
surface waters. Soaps and detergents, even the biodegradable ones, can have immediate and long-
term effects.
3.1.1 Suggested BMPs
3.1.1.1 At Home
• Wash cars directly over lawn areas or make sure the wash water drains to a
vegetated area.
• Ideally, no soaps or detergents should be used, but if one is used, select one without
phosphates.
• Consider using commercial products that allow cleaning a vehicle without water.
• Use a hose nozzle with a shut-off valve to save water.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 466
• Do not wash cars if rain is expected.
• Pour the bucket of soapy, dirty wash water down your sink.
3.1.1.2 Away from Home
• Take cars to a commercial car wash that has a recycle system and discharges
wastewater to the sanitary sewer for treatment.
• Go to fundraising car washes where sponsors use Auburn’s Car Wash loaner kits.
Use a Car Wash loaner kit. If your group is planning a car wash in Auburn, call
(253) 931-3010 to get information about using a Car Wash loaner kit.
3.2 Automobile Maintenance
3.2.1 Required BMPs
• Recycle all oils, antifreeze, solvents, and batteries. Many local car parts dealers and
gas stations accept used oil. The King County Household Hazardous Wastemobile
makes regular, scheduled visits to Auburn and accepts oil, oil filters, antifreeze, and
solvents, (website:
http://www.govlink.org/hazwaste/house/disposal/AnyProduct.cfm?catID=974 or call
206-296-4692). Old batteries can actually be worth money. Recycle old batteries at
automotive or battery shops.
• Never dump new or used automotive fluids or solvents on the ground, in a storm
drain or street gutter, or in a waterbody.
• Do not mix wastes. Always keep your wastes in separate containers which are
properly labeled and store them out of the weather.
3.2.2 Suggested BMPs
• Fix all leaks, to keep the leaky material off the streets and out of the surface water.
• To dispose of oil filters, punch a hole in the top and let drain for 24 hours. After
draining, wrap in 2 layers of plastic and dispose of in your regular garbage or recycle
by taking it to the King County Household Hazardous Waste Wastemobile. Pending
State law may make disposal in your home garbage illegal, so please call the King
County Household Hazards Line at (206) 296-4692 for up-to-date information.
• Use care in draining and collecting antifreeze to prevent accidental spills. Spilled
antifreeze can be deadly to cats and dogs that ingest it.
• Perform service activities on concrete or asphalt or over a plastic tarp to make spill
clean-up easier. Keep a bag of kitty litter on hand to absorb spills. Sprinkle a good
layer on the spill, let it absorb and then sweep it up. Place the contaminated litter in a
double plastic bag (bag in a bag), tie it up, and dispose of it in your regular garbage.
Do not leave kitty litter out in the rain.
• If body work is performed outside, be sure to use a tarp to catch material resulting
from grinding, sanding, and painting. Dispose of this waste by double bagging in
plastic and placing in garbage.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 467
3.3 Storage of Solid Wastes and Food Wastes
Improper storage of food and solid waste at residences can lead not only to water pollution problems,
but problems with neighborhood pets and vermin as well. Following the BMPs listed below can help
keep property a clean and healthy place to live.
3.3.1 Suggested BMPs
• All waste containers kept outside should have lids. If the hauler container lid is
damaged, please call the City of Auburn Utilities at (253) 931-3038 for information on
lid repair and replacement.
• Leaking waste containers should be replaced. If the container is damaged, please
call City of Auburn Utilities at (253) 931-3038.
• Store waste containers under cover if possible, or on grassy areas.
• Inspect the storage area regularly to pick up loose scraps of material and dispose of
them properly.
• Recycle as much as you can. The City of Auburn offers curbside recycling. Also, look
under "Recycling" in the phone book for firms which take other recyclables or call the
City of Auburn Solid Waste Division at (253) 931-3047.
• Purchase products which have the least amount of packaging materials.
• Recycle biodegradable materials such as grass clippings and vegetable scraps in
your yard waste cart instead of throwing them away. Call the City of Auburn Utilities
at (253) 931-3038 for more information on yard and food scrap recycling.
3.4 Composting
Composting is an earth-friendly activity as long as the rules outlined below are followed. The
following BMPs are applicable to composting. For more information go to the City of Auburn’s
website at www.auburnwa.gov or call the City of Auburn Solid Waste Division at (253) 931-3047.
3.4.1 Suggested BMPs
• Locate compost bins on an unpaved area that is not prone to water ponding during
storms, and well away from wetlands, streams, lakes and other drainage paths.
• Compost bins must be maintained and turned over regularly to work properly. Large
piles of unattended compost may create odor and vermin problems and are not
allowed within City limits.
• Do not put hazardous or non-decomposable waste in the bin.
• Cover the bin to keep excess water from cooling down the pile, which will slow down
the rate of decomposition.
• An alternative to traditional backyard composting is worm composting. For more
information on getting started with worm composting, call the City of Auburn Solid
Waste Division at (253) 931-3047.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 468
3.5 Yard Maintenance and Gardening
This section deals with the normal yard maintenance activities typically performed at residences.
Overwatering, overfertilizing, improper herbicide application, and improper disposal of trimmings and
clippings can all contribute to serious water pollution problems. Following the BMPs listed below will
help alleviate pollutant runoff.
3.5.1 Required BMPs
Follow the manufacturer's directions exactly for mixing and applying herbicides, fungicides,
and pesticides, and use them sparingly. Never apply when it is windy or when rain is
expected. Never apply over water, within 100 feet of a well-head, or adjacent to streams,
wetlands, or other waterbodies. Triple-rinse empty containers, using the rinsate for mixing
your next batch of spray, and then double-bag and dispose of the empty container in your
regular garbage. Never dispose of grass clippings or other vegetation in or near storm
drains, streams, lakes, or Puget Sound.
3.5.2 Suggested BMPs
• Use natural, organic soil amendments. Visit www.kingcounty.gov/environment. Click
on Composting, Natural Lawn Care for natural yard care information.
• Use an integrated pest management program (IPM), which is a natural, long-term,
ecologically based approach to controlling pest populations. See Section 4.4.6 and
Appendix C – Example of an Integrated Best Management Program.
• Follow manufacturer's directions when applying fertilizers. More is not better, either
for your lawn or for local waterbodies. Never apply fertilizers over water or adjacent
to ditches, streams, or other water bodies. Remember that organic fertilizers have a
slow release of nitrogen, and less potential to pollute then synthetic fertilizers.
• Save water and prevent pollution problems by watering lawns sensibly. Lawns and
gardens typically need the equivalent of 1-inch of rainfall per week. Put a wide mouth
jar out where watering is occurring, and measure the water with a small plastic ruler.
Overwatering to the point of runoff can carry polluting nutrients to the nearest
waterbody.
• Consider using native plants as a vegetated buffer zone adjacent to streams or other
water bodies. Call the Garden hotline at 206-633-0224 for advice and assistance in
developing a planting plan or visit www.kingcounty.gov/Environment, Click on
Compost, Plant Right for Your Site.
• Reduce the need for pesticides and fertilizers on lawns by improving the health of the
soil. Aerating, thatching, and topdressing with compost will improve soil health and
help wanted grasses compete with weeds and moss.
• Make sure all fertilizers and pesticides are stored in a covered location.
• Use a mulching mower and mow higher to improve soil/grass health and reduce or
eliminate pesticide use.
• Compost all yard clippings, or use them as mulch to save water and keep down
weeds in your garden. See Composting section for more information.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 469
• Practice organic gardening and virtually eliminate the need to use pesticides and
fertilizers. Contact King County Master Gardener Phone Clinic at 206-296-3440 for
information and classes on earth-friendly gardening.
• Pull weeds instead of spraying and get some healthy exercise, too. If you must
spray, use the least toxic formulations that will get the job done. The Master
Gardener program listed above can help advise you on which spray to use.
• Work fertilizers into the soil instead of letting them lie on the ground surface exposed
to the next rain storm.
• Plant vegetation suited to Northwest conditions because they require less water and
fewer to no fertilizers and pesticides.
• The City of Auburn has a curbside yard waste recycling program. Call 253-931-3038
for more information.
3.6 Swimming Pool and Spa Cleaning and Maintenance
Despite the fact that we immerse ourselves in it, the water from pools and spas is far from chemically
clean. Nutrients, pH, and chlorine can adversely affect fish and wildlife in waterbodies. Following
these BMPs will ensure the cleanliness of your pool and the environment.
3.6.1 Required BMPs
• Pool and spa water must be dechlorinated if it is to be emptied into a ditch, on the
ground or a lawn, or to the storm drainage system. Contact a pool chemical supplier
to obtain the neutralizing chemicals needed. The rate of flow into the ditch or
drainage system must be regulated so that it does not cause problems such as
erosion, surcharging, or flooding. Contact the City of Auburn Strom Drainage Utility
at 253-931-3010 for any conditions for discharge approval. Water discharged to the
ground or a lawn must not cross property lines and must not produce runoff.
• If pool and spa water cannot be dechlorinated, it must be discharged to the sanitary
sewer. Prior to draining a pool or spa, contact the City of Auburn Sanitary Sewer
Utility at 253-931-3010 for any conditions for discharge approval. A pool service
company can help determine the frequency of cleaning and backwash of filters.
• Diatomaceous earth used in pool filters cannot be disposed of in surface waters, on
the ground, or into storm drainage systems or septic systems. Dry it out as much as
possible, bag it in plastic, and dispose of at the landfill.
3.6.2 Suggested BMPs
• Hire a professional pool service company to collect all pool water for proper disposal.
Make sure to ask where the water will be disposed of and ensure the proper permits
have been obtained.
3.7 Household Hazardous Material Use, Storage, and Disposal
Oil-based paints and stains, paint thinner, gasoline, charcoal starter fluid, cleaners, waxes,
pesticides, fingernail polish remover, and wood preservatives are just a few hazardous materials
typically used in a residential setting.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 470
When hazardous materials are dumped on the ground or in a storm drain, they can be washed
directly to receiving waters where fish and wildlife can be harmed. Hazardous materials can also
infiltrate into the ground and contaminate drinking water supplies. If disposed of with regular garbage,
hazardous chemical containers can leak at the landfill and contaminate groundwater. Groundwater
contamination can also occur if hazardous products are poured down a sink or toilet into a septic
system. Do not pour hazardous chemicals down the drain if household plumbing is connected to
municipal sewers, either. Many compounds will "pass through" the wastewater treatment plant
without treatment and contaminate receiving waters, or they can harm the biological process used at
the treatment plant, reducing overall treatment efficiency.
With such a diversity of hazardous products present in all homes in Auburn, a large potential for
serious environmental harm exists if improper methods of storage, usage, and disposal are
employed. Using the following BMPs will help keep these materials out of soils, sediments, and
waters.
3.7.1 Required BMPs
• Hazardous materials must be stored out of the reach of children.
• Dispose of hazardous materials and their containers properly. Never dump products
labeled as poisonous, corrosive, caustic, flammable, inflammable, volatile, explosive
danger, warning, caution, or dangerous outdoors, in a storm drain, or into sinks,
toilets or drains. Call the King County Hazardous Waste Line at 206-296-4692 or
1-888-TOXIC ED for information on disposal methods, collection events, and
alternative products. Household hazardous wastes from City of Auburn residents are
accepted at King County Household Hazardous Waste Facilities.
3.7.2 Suggested BMPs
• Check hazardous material containers frequently for signs of leakage. If a container is
rusty and has the potential of leaking soon, place it in a secondary container before
the leak occurs and prevent a clean-up problem.
• Store hazardous materials containers under cover and off the ground. Keep them out
of the weather to avoid rusting, freezing, cracking, labels being washed off, etc.
• Keep appropriate spill cleanup materials on hand. Kitty litter is good for many oil-
based spills.
• Ground cloths and drip pans must be used under any work outdoors which involves
hazardous materials such as oil-based paints, stains, rust removers, masonry
cleaners, and others bearing label warnings as outlined above.
• Latex paints are not a hazardous waste, but are not accepted in liquid form at the
landfill. To dispose, leave uncovered in a protected place until dry, then place in the
garbage. If you wish to dry waste paint quickly, just pour kitty litter in the can to
absorb the paint. Once paint is dry, leave the lid off when you place it in the garbage
so the garbage collector can see that it is no longer liquid.
• Use less toxic products whenever possible. The King County Household Hazards
Line at 206-296-4692 or 1-888-TOXIC ED and the Washington Toxics Coalition at
206-632-1545 have information detailing alternatives to toxic products.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Homeowners Volume IV
Chapter 3 471
• If an activity involving the use of a hazardous material can be moved indoors out of
the weather, then do so. Make sure proper ventilation is provided.
• Follow manufacturers' directions in the use of all materials. Over-application of yard
chemicals, for instance, can result in the washing of these compounds into receiving
waterbodies. Never apply pesticides when rain is expected.
• When hazardous materials are in use, place the container inside a tub or bucket to
minimize spills.
• Purchase only the amount of product that is needed.
3.8 General Home Maintenance
This section deals with the normal maintenance activities typically performed in residential settings.
Following the BMPs listed below will help alleviate pollutant runoff.
3.8.1 Suggested BMPs
Pressure washing of building facades, rooftops, pavement, and other large objects must be
conducted in such a way that all of the runoff is collected for proper disposal. No runoff shall leave the
site. Temporary curbs, dikes, or berms may be used to direct the water away from storm drains.
Sweep up and collect debris for disposal as solid waste as an alternative to pressure washing.
Carpet cleaning wash water must be disposed of to the sanitary sewer. It is preferred that the dirty
wash water be discharged into a toilet or mop sink at the place where it was generated.
Clean brushes and tools coated with non-water-based paints, finishes, or other materials in a manner
that allow collection of used solvents (e.g. paint thinner, turpentine, xylol, etc.) for proper disposal at a
Household Hazardous Waste Facility. Call the King County Household Hazards Line at
206-296-4692 or 1-888-TOXIC ED for information on disposal methods, collection events, and
alternative products. Household hazardous wastes from City of Auburn residents are accepted at
King County Household Hazardous Waste Facilities.
3.9 Pet Waste
Pets can generate pollutants from manure deposits, animal washing, and cage or kennel cleaning.
Pollutants include bacteria which can pollute water ways and make people sick. To prevent pet waste
pollutants from entering the storm drains, follow the BMPs listed below.
3.9.1 Suggested BMPs
• Regularly scoop, sweep and clean up pet waste deposited on walks and at home.
Dispose of pet waste in the garbage or flush it down the toilet.
• When cleaning out cages and kennels, wash directly over lawn areas or make sure
the wash water drains to a vegetated area. Alternately, dispose of the wash water
down the toilet or a mop sink.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 472
Chapter 4 BMPs for Commercial and Industrial Activities
This chapter coordinates with the worksheet completed in Chapter 2. That worksheet and the BMPs
are organized by the different activities that businesses perform. If the listed activity is performed
indoors and all discharges from the activity are controlled (e.g., process water, wash water,
lubricants, solvents, fugitive dust, granular material, blowdown waste, etc.) such that no exposure to
stormwater occurs, then no new BMPs for that activity are required. However, if the column for
activities performed outdoors was checked, match the number from the worksheet to the activities
listed in this section to find the BMPs suggested.
Contact the City’s Storm Drainage Utility at 253-931-3010 for more information or technical
assistance. Assistance can be provided over the phone or at on-site consultations.
Every person/business in Auburn is required to use BMPs as outlined in this manual. Utilizing
additional BMPs to protect water further quality is encouraged.
Some businesses are or will be required to obtain a National Pollutant Discharge Elimination System
(NPDES) permit for stormwater discharges. These permits are issued and regulated by the
Washington State Department of Ecology.
There are several BMPs contained in this chapter that may also apply to residences and other non-
commercial or non-industrial sites.
4.1 BMPs to Consider for all Activities
Some common best management practices that should be considered for all activities include:
• Avoid the activity or reduce its occurrence.
• Move the activity indoors if possible.
• Clean up spills quickly.
• Use less material.
• Use the least toxic materials available.
• Create and maintain vegetated areas near activity locations.
• Locate activities as far as possible from surface drainage paths.
• Keep storm drain systems clean.
• Reduce, reuse, and recycle as much as possible.
• Be an advocate for stormwater pollution prevention.
• Report violators to Storm Drainage Utility 253-931-3010.
• Provide oversight and training.
• Sweep or vacuum to control dust and debris.
• Regularly inspect, clean, and repair all facilities and BMPs.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 473
4.2 Cleaning and Washing Activities
4.2.1 BMP A101: Cleaning or Washing of Tools, Engines and
Manufacturing Equipment
4.2.1.1 Description of Pollutant Sources
This activity applies to businesses and public agencies that clean manufacturing equipment such as
saws, grinders, screens, and other processing devices outside of buildings, and to businesses
engaged in pressure washing of engines, equipment, and portable objects.
Pollutants sources include toxic hydrocarbons, organic compounds, oils and greases, nutrients,
heavy metals, pH, suspended solids, biochemical oxygen demand (BOD), and chemical oxygen
demand (COD).
4.2.1.2 Pollutant Control Approach
The preferred approach is to cover and/or contain the cleaning activity or conduct the activity inside a
building, to separate the uncontaminated stormwater from the pollutant sources. Wash water must be
conveyed to a sanitary sewer after approval by the City of Auburn, temporarily stored before proper
disposal, or recycled, with no discharge to the ground, a storm drain, or surface water. Washwater
may be discharged to the ground after proper treatment in accordance with Ecology Guidance WQ-
R-95-56, “Vehicle and Equipment Washwater Discharges,” revised September 2007. The quality of
any discharge to the ground after proper treatment must comply with Ecology’s Groundwater Quality
Standards, Chapter 173-200 WAC. Contact the Ecology Southwest Regional Office for an NPDES
Permit application for discharge of washwater to surface water or to a storm drain after on-site
treatment.
4.2.1.3 Required BMPs
The following BMPs, or equivalent measures, are required of all businesses and public agencies
engaged in cleaning or washing of tools, engines, equipment, and portable objects:
• Illicit connections to the storm drainage system must be eliminated. See BMP S101
for detailed information.
• Employees shall be educated to control washing operations to prevent stormwater
contamination.
• All washwater must discharge to a holding tank, process treatment system, or
sanitary sewer, never to the storm drain system. See BMP S103 for detailed
information on how this must be accomplished.
• Pressure washing must be done in a designated area (such as a wash pad) provided
with a sump drain and stormwater run-on prevention (Figure IV-4-1). See BMPs
S106 and S107 for information on sumps (or holding tanks) and run-on prevention.
Contact the City of Auburn Storm Drainage Utility at 253-931-3010 for washing
operation policy.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 474
Figure IV-4-1. Pressure Wash Water Recovery System
4.2.1.4 Recommended BMPs
The following BMPs are not required, but they can provide additional pollution control:
• If soaps or detergents are used, use the least toxic cleaner capable of doing the job.
Use non-phosphate detergent, if possible, to reduce loadings at your local
wastewater treatment plant.
• Limit the amount of water used in washing activities to reduce the potential of runoff
carrying pollutants beyond the designated wash pad or capture system.
• Recycle washwater for subsequent washings.
• Implement one or more of the following stormwater treatment BMPs in addition to the
Required BMPs:
o Oil/water separator (do not use an oil/water separator for wash water
containing soaps or detergents).
o Wet vault for settling.
o Infiltration basin.
o Filtration with media designed for the pollutants present.
o Catch basin with a filter insert for pressure washing to collect suspended
solids.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 475
• Catch basin filters and/or sorbent inserts should be selected based on the type of
contaminants in the stormwater.
For discharging washwater containing soaps and detergents, the use of infiltration, biofiltration, wet
ponds, and wetlands must not result in the violation of groundwater quality standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 476
4.2.2 BMP A102: Cleaning or Washing of Cooking Equipment
4.2.2.1 Description of Pollutant Sources
This activity applies to businesses that clean cooking equipment such as vent filters, grills, hoods,
and grease traps outside of buildings and clean paved areas and floor mats around cooking
equipment.
Pollutants of concern consist of oil and grease, nutrients, suspended solids, biochemical oxygen
demand (BOD) and chemical oxygen demand (COD)
4.2.2.2 Pollutant Control Approach
Businesses engaged in this activity that cannot connect discharges to a sanitary sewer, holding tank,
or process water treatment system must contact the Department of Ecology and obtain a National
Pollutant Discharge Elimination System (NPDES) wastewater permit.
4.2.2.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses engaged in cleaning or
washing of cooking equipment:
• Illicit connections to the storm drainage system must be eliminated. See BMP S101
for detailed requirements.
• Employees must be educated about the need to prevent stormwater contamination
from washing operations.
• Washwater cannot be discharged to the storm drainage system.
• Paved washing areas must be swept daily to collect loose solid materials for proper
disposal.
• Greasy buildup on cooking equipment must be removed and properly disposed of
prior to washing to reduce the amount of material that can potentially contaminate
runoff. Washing must either take place on a wash pad connected to the sanitary
sewer, or the wastewater must be collected and disposed in the sanitary sewer.
• Move the activity indoors, into either an existing building or a newly constructed
building or shed, with drainage to a sanitary sewer, holding tank, or process
treatment system. See BMP S103 for further information on drainage alternatives.
Any connection to the sanitary sewer requires the approval of the City of Auburn. If
the washing activity cannot be moved indoors or contained in a tub, then the washing
area must drain to a sanitary sewer, holding tank, or process treatment system, and
provisions must be made to prevent stormwater run-on onto the washing area. See
BMP S103 for detailed drainage requirements and BMP S107 for methods of run-on
prevention. If discharging to a sanitary sewer, permits must be obtained from the City
of Auburn Permit Center 253-931-3090.
OR
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 477
Use a tub or similar device to contain washwater. This water must be recycled for subsequent
washing, or disposed into a holding tank or sanitary sewer.
• If a holding tank is used for storage of washwater, the contents must be pumped out
before it is full and disposed of appropriately to a sanitary sewer or wastewater
treatment system.
4.2.2.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• A cover should be placed over a designated wash area to keep rain from falling on
dirty equipment and producing contaminated runoff.
• Implement one or more of the following treatment BMPs in addition to the required
BMPs:
o Oil/water separator.
o Wet vault for settling.
o Infiltration basin with pretreatment.
o Filtration with media designed for the pollutants present.
For discharging washwater containing soaps and detergents, the use of infiltration, biofiltration, wet
ponds, and wetlands must not result in the violation of groundwater quality standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 478
4.2.3 BMP A103: Washing, Pressure Washing and Steam Cleaning of
Vehicles/Equipment/Building Structures
4.2.3.1 Description of Pollutant Sources
Vehicles, aircraft, vessels/boats, grocery carts, carpets, industrial equipment, and large buildings or
structures may be commercially cleaned with low or high pressure water or steam. This also includes
removing graffiti and “charity” car washes at gas stations and commercial parking lots. The cleaning
can include hand washing, scrubbing, sanding, etc. Washwater from cleaning activities can contain
oil and grease, suspended solids, heavy metals, soluble organics, soaps, and detergents that can
contaminate stormwater.
4.2.3.2 Pollutant Control Approach
The preferred approach is to cover and/or contain the cleaning activity, or conduct the activity inside a
building, to separate the uncontaminated stormwater from the pollutant sources. Washwater must be
conveyed to a sanitary sewer after approval by the City of Auburn. See Ecology guidance
WQ-R-95-56, “Vehicle and Equipment Washwater Discharges,” June 1995 for more information.
4.2.3.3 Required BMPs:
New and Used Car Dealer Lots
If washing is accomplished only with cold water and consists of washing only the outside of the motor
vehicles, (no soaps or detergents used) there should be no discharge to the sanitary sewer. See
Ecology guidance WQ-R-95-56, “Vehicle and Equipment Washwater Discharge”, June 1995, for
more information.
If soaps or detergents are to be used, washing must occur on a dedicated wash pad. Only the
washing of the outside of the vehicles is permitted. The wash pad must be equipped with a catch
basin/sediment trap that discharges through a tee outlet to the sanitary sewer. The tee outlet will
allow containment of minor amounts of free-floating oil. Wastewater must meet local limitations on
wastewater strength and quality. If engines and/or undercarriages are to be washed additional
pretreatment will be required. Contact the City of Auburn Storm Drainage Utility at 253-931-3010 for
further information. The facility will be inspected periodically by City staff.
Other Washing Events
Identify types of washing events and their locations (such as regional used car sales, RV shows,
etc.) and evaluate options on a case-by-case basis according to the discharge criteria stated above.
Charity car washes should wash only the exterior of vehicles. If soap is used the wash water must be
captured and directed to the sanitary sewer. For information concerning the use of charity car wash
kits, contact City of Auburn Public Works Department at 253-931-3010.
Pressure washing of building facades, rooftops, pavement, and other large objects must be
conducted in such a way that all of the runoff is collected for proper disposal. No runoff shall leave the
site. Temporary curbs, dikes, or berms may be used to direct the water to a collection point or catch
basins may be covered to help contain the water. The collected water, provided it meets local limits,
should be disposed of to the sanitary sewer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 479
On a case by case basis, if runoff does not contain pollutants, following appropriate pretreatment,
such as filtration or sedimentation, then this water may be allowed to be discharged to the storm
drainage system. Contact the City of Storm Drainage Utility at 253-931-3010 for more information.
Automatic Car Wash
At a minimum, a catch basin/sediment trap that discharges through a tee outlet to the sanitary sewer
is required. Other requirements may be necessary on a case-by-case basis.
Manual (Wand) Car Wash
There must be covered and bermed bays with a catch basin/sediment trap connected to a designed
pretreatment device discharging to the sanitary sewer. At a minimum a coalescing plate oil water
separator will be required. The facility will be inspected periodically by City staff.
Truck Washing Facilities
Wash on a concrete or asphalt paved dedicated wash pad with a catch basin/sediment trap
connected to a designed pretreatment device, which discharges to the sanitary sewer. At a minimum
a coalescing plate oil water separator will be required. The facility will be inspected periodically by
City staff.
Mobile Vehicle Washers
The following summarizes the requirements for mobile vehicle and grocery cart washers doing work
in the City of Auburn. Contact the City of Auburn Storm Drainage Utility at 253-931-3010 for more
information.
Mobile vehicle washers must possess a current City of Auburn Business License and they must
possess a Letter of Authorization issued by the City’s Storm Drainage Utility.
Mobile Vehicle Washers must also:
• Discharge all wash water to the sanitary sewer;
• Submit MSDS sheets for all chemicals used;
• Obtain Source Control approval for any chemicals used; and
• Provide adequate means to prevent contaminated wash water from entering the
storm drainage system or discharging onto unpaved ground.
Mobile vehicle washers may wash only the exteriors of the vehicles. Engine washing, cleaning the
undercarriage or fifth wheel is strictly prohibited unless prior approval is received from the Storm
Drainage Utility. Additional pretreatment may be required. Discharges from mobile washing must
meet City of Auburn code requirement, Chapter 13.20 discharge limitations for pH.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 480
Those washers employing the two-step (acid-alkaline) process must obtain approval from City of
Auburn Sanitary Sewer Utility on a case-by-case basis. At a minimum, two-step washers must:
• Provide some means of holding and mixing the wash water generated;
• Provide an accepted means of testing the pH of the mixed wash water;
• Provide a means of adjusting the pH, if necessary, to within City of Auburn limits;
• Discharge the wastewater to the sanitary sewer; or
• Capture all of the water and dispose of it at a licensed treatment, storage, and
disposal facility.
Mobile vehicle washers must discharge wash water to the sanitary sewer system through an on-site
cleanout if available. Only wastewater generated within the City of Auburn may be discharged into
the municipal sewer system.
4.2.3.4 General
Two-step washing may be allowed at all facilities discharging to the sanitary sewer. Provisions must
be in place to neutralize the wash water rinsate prior to introduction into the sanitary sewer system.
For facilities with dedicated wash pads with either a catch basin with a tee discharge and/or
pretreatment equipment, sampling and monitoring ports will be required. Additionally, the installation
of a valve may be required to prevent discharge from the system in the event of a spill. All ports must
be accessible for inspection and sampling at all times. Any equipment needed for access must be
available at all times.
Any sampling and testing required of industry to verify pretreatment equipment performance shall be
accomplished by using 40 CFR Part 136 approved methods. For Total Petroleum Hydrocarbons
(TPH) EPA Method 1664 may be used.
Applicants requesting approval of designed oil/water separator systems must submit three (3) sets of
plans.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 481
4.2.4 BMP A104: Collection and Disposal of Wastewater in Mobile Interior
Washing Operations
4.2.4.1 Description of Pollutant Sources
This activity applies to businesses that wash carpets and other interior items on a mobile site-to-site
basis. The typical washing process includes use of machines that spray the wash water solution onto
the carpet or upholstery and then suck the dirty solution up into a portable tank with limited capacity.
Pollutants of concern consist of nutrients, suspended solids, organic compounds (such as pesticides
and chemicals used for flea and odor control), biochemical oxygen demand (BOD), and chemical
oxygen demand (COD).
4.2.4.2 Pollutant Control Approach
Wastewater must be poured into a sanitary sewer drain at the site of collection, the business office,
or at another proper location. If sanitary sewer disposal is not available or not allowed, the collected
wastewater must be returned to the business site for process treatment or transfer to a holding tank.
4.2.4.3 Required BMPs
This BMP is required of all businesses doing mobile interior wash activities:
• Absolutely no wastewater from mobile interior wash activities shall be disposed of
outdoors, or to a drain connected to the storm drainage system. This point must be
made clear to all employees. Wastewater from mobile washing operations may be
permitted for sanitary sewer disposal if it does not contain high concentrations of
toxic materials. Some of the chemicals used for flea and odor control are listed by
EPA as toxics. Contact the City of Auburn Sanitary Sewer Utility at 253-931-3010 if
you intend to use and discharge these types of chemicals. All wastewater must be
poured into a sanitary sewer drain at the site of collection, the business office, or at
another proper location.
• If sanitary sewer disposal is not available or not allowed, the collected wastewater
must be returned to the business site for process treatment or transfer to a holding
tank. See BMP S103 for details on these drainage/disposal alternatives.
Carpet cleaning wash water must be disposed of to the sanitary sewer. It is preferred that the dirty
wash water be discharged into a toilet or sink at the place where it was generated. Alternatively, the
carpet cleaner may discharge the water into the sanitary sewer back at their place of business if
located in Auburn. Otherwise, they must contact the sewerage agency providing their service for that
agency’s approval.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 482
4.2.4.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• Use the least toxic detergents and cleaners that will get the job done. Select non-
phosphate detergents when possible.
• Limit the amount of water used in interior washing operations. This will save you
time, money, and effort when it comes to proper disposal.
• Recycle washwater for more than one use.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 483
4.3 Transfer of Liquid or Solid Materials
4.3.1 BMP A201: Loading and Unloading Areas for Liquid or Solid Material
4.3.1.1 Description of Pollutant Sources
Loading/unloading of liquid and solid materials at industrial and commercial facilities is typically
conducted at shipping and receiving, outside storage, fueling areas, etc. Materials transferred can
include products, raw materials, intermediate products, waste materials, fuels, scrap metals, etc.
Leaks and spills of fuels, oils, powders, organics, heavy metals, salts, acids, alkalis, etc. during
transfer are potential causes of stormwater contamination. Spills from hydraulic line breaks are a
common problem at loading docks.
4.3.1.2 Pollutant Control Approach
Cover and contain the loading/ unloading area where necessary to prevent run-on of stormwater and
runoff of contaminated stormwater.
4.3.1.3 Required BMPs
At All Loading/ Unloading Areas:
• A significant amount of debris can accumulate at outside, uncovered
loading/unloading areas. Sweep these surfaces frequently to remove material that
could otherwise be washed off by stormwater. Sweep outside areas that are covered
for a period of time by containers, logs, or other material after the areas are cleared.
• Place drip pans or other appropriate temporary containment devices at locations
where leaks or spills may occur such as hose connections, hose reels, and filler
nozzles. Drip pans shall always be used when making and breaking connections
(see Figure IV-4-2). Check loading/unloading equipment such as valves, pumps,
flanges, and connections regularly for leaks and repair as needed. Frequent
monitoring of drip pans is required to ensure captured materials are not displaced by
wind or rainwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 484
Figure 4.2 – Drip Pan
Figure IV-4-2. Drip Pan
At Tanker Truck and Rail Transfer Areas to Above/Below-ground Storage Tanks:
• To minimize the risk of accidental spillage, prepare an "Operations Plan" that
describes procedures for loading/unloading. Train the employees, especially fork lift
operators, in its execution and post it or otherwise have it readily available to
employees.
• Report spills of reportable quantities to Ecology’s Northwest Regional Office
425-649-7000.
• Prepare and implement an Emergency Spill Cleanup Plan for the facility (BMP A714
Spills of Oil and Hazardous Substances) which includes the following BMPs:
o Ensure the clean up of liquid/solid spills in the loading/unloading area
immediately if a significant spill occurs, upon completion of the
loading/unloading activity, or at the end of the working day.
o Retain and maintain an appropriate oil spill cleanup kit on-site for rapid
cleanup of material spills (see BMP A714 Spills of Oil and Hazardous
Substances).
o Ensure that an employee trained in spill containment and cleanup is present
during loading/unloading.
At Rail Transfer Areas to Above/Below-ground Storage Tanks:
Install a drip pan system as illustrated (see Figure IV-4-3) within the rails to collect
spills/leaks from tank cars and hose connections, hose reels, and filler nozzles.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 485
Figure IV-4-3. Drip Pan Within Rails
Loading/Unloading from/to Marine Vessels:
Facilities and procedures for the loading or unloading of petroleum products must comply
with Coast Guard requirements.
Transfer of Small Quantities from Tanks and Containers:
Refer to BMPs A408 Storage of Liquids in Permanent Above-Ground Tanks and A407
Storage of Liquid, Food Waste, or Dangerous Waste Containers for requirements on the
transfer of small quantities from tanks and containers, respectively.
At All Loading/ Unloading Areas:
• Consistent with Uniform Fire Code requirements and to the extent practicable,
conduct unloading or loading of solids and liquids in a manufacturing building or
under a roof, lean-to, or other appropriate cover.
• Berm, dike, and/or slope the loading/unloading area to prevent run-on of stormwater
and to prevent the runoff or loss of any spilled material from the area.
• Large loading areas frequently are not curbed along the shoreline. As a result,
stormwater passes directly off the paved surface into surface water. Place curbs
along the edge, or slope the edge such that the stormwater can flow to an internal
storm drain system that leads to an approved treatment BMP.
• Pave and slope loading/unloading areas to prevent the pooling of water. The use of
catch basins and drain lines within the interior of the paved area must be minimized
as they will frequently be covered by material, or they shall be placed in designated
“alleyways” that are not covered by material, containers, or equipment.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 486
4.3.1.4 Recommended BMPs:
• For the transfer of pollutant liquids in areas that cannot contain a catastrophic spill,
install an automatic shutoff system in case of unanticipated off-loading interruption
(e.g. coupling break, hose rupture, overfill, etc.).
At Loading and Unloading Docks:
• Install/maintain overhangs or door skirts that enclose the trailer end
(see Figure IV-4-4 and Figure IV-4-5) to prevent contact with rainwater.
• Design the loading/unloading area with berms, sloping, etc. to prevent the run-on of
stormwater.
• Retain on-site the necessary materials for rapid cleanup of spills.
At Tanker Truck Transfer Areas to Above/Below-Ground Storage Tanks:
• Pave the area on which the transfer takes place. If any transferred liquid, such as
gasoline, is reactive with asphalt, pave the area with Portland cement concrete.
• Slope, berm, or dike the transfer area to a dead-end sump, spill containment sump,
spill control (SC) oil/water separator, or other spill control device. The minimum spill
retention time should be 15 minutes at the highest fuel dispenser nozzle through-put
rate or the peak flow rate of the 6-month, 24-hour storm event over the surface of the
containment pad, whichever is greater. The volume of the spill containment sump
should be a minimum of 50 gallons with an adequate grit sedimentation volume.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 487
Figure IV-4-4. Loading Dock with Door Skirt
Figure 4.5 – Loading Dock with Overhang
Figure IV-4-5. Loading Dock with Overhang
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 488
4.3.2 BMP A202: Fueling at Dedicated Stations
4.3.2.1 Description of Pollutant Sources
A fueling station is a facility dedicated to the transfer of fuels from a stationary pumping station to
mobile vehicles or equipment. It includes above or under-ground fuel storage facilities. In addition to
general service gas stations, fueling may also occur at 24-hour convenience stores, construction
sites, warehouses, car washes, manufacturing establishments, port facilities, and businesses with
fleet vehicles. Typically, stormwater contamination at fueling stations is caused by leaks/spills of
fuels, lube oils, radiator coolants, and vehicle wash water.
4.3.2.2 Pollutant Control Approach
New or substantially remodeled fueling stations must be constructed on an impervious concrete pad
under a roof to keep out rainfall and stormwater run-on. Substantial remodeling includes replacing the
canopy or relocating or adding one or more fuel dispensers in such a way that the Portland cement
concrete (or equivalent) paving in the fueling area is modified. A treatment BMP must be used for
contaminated stormwater and wastewaters in the fueling containment area.
4.3.2.3 Required BMPs:
General Requirements
• Fuel islands shall not drain into the storm drainage system.
• Fuel islands shall be paved and provide a means to protect the storm drainage and
sanitary sewers from spills.
• Fuel islands may provide blind sumps for spill containment, or they may drain into
the sanitary sewer through a properly sized oil/water separator protected by an
emergency shut-off valve. Contact the City of Auburn Sanitary Sewer Utility at 253-
931-3010 for assistance.
• Fueling areas must encompass the reach of the longest fueling hose.
Oil/Water Separator Requirements (see Figure IV-4-6)
• Separators shall have as a minimum a 4” diameter tee installed in the discharge line.
• Separators shall have an emergency shut-off valve installed on the discharge line. A
valve key shall be provided and be prominently displayed near the shut-off valve.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 489
Figure IV-4-6. Oil/Water Separator Layout
Accidental Spill Prevention Plan
An Accidental Spill Prevention Plan developed by the operator and approved by Storm
Drainage Utility shall be available for inspection. See BMP A714 Spills of Oil and Hazardous
Materials for the elements of a spill plan.
Covered Fuel Islands
• Areas outside the canopy cover shall be sloped or bermed to divert precipitation
away from the fuel island and into the storm drainage system.
• For a covered fuel island with incidental stormwater run-on and no more than four
(4) hose bibs, a minimum 18 gpm rated, 530 gallon capacity oil/water separator
(Hanson Pipe Vault 466-S or equivalent) shall be used when connecting to a sanitary
sewer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 490
• Covered fueling islands must have a roof or canopy to prevent the direct entry of
precipitation onto the spill containment pad (see Figure IV-4-7 below). The roof or
canopy shall, at a minimum, cover the spill containment pad (within the grade break
or fuel dispensing area) and preferably extend several additional feet to reduce the
introduction of windblown rain. Convey all roof drains to storm drains outside the
fueling containment area.
Figure IV-4-7. Covered Fuel Island
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 491
Uncovered Fuel Islands
a. Fuel islands shall be sized to minimize the area which drains to the sanitary
sewer. Areas outside the pad shall be sloped to divert precipitation into the storm
drainage system.
b. Separators used for spill protection with uncovered fuel islands must be sized
using standard engineering practices and shall be based on a 25-year storm
event (see Table IV-4-1 below).
Table IV-4-1. Uncovered Fuel Island Separator Sizing Requirements
Calculated Flow
(gpm)
Separator Size Requirement
18 530 gallon capacity PIPE Vault 466-S, or equivalent
30 900 gallon capacity PIPE Vault 577-S, or equivalent
72 2,160 gallon capacity PIPE Vault 5106-S, or equivalent
108 3,230 gallon capacity PIPE Vault 612-S, or equivalent
126 3,770 gallon capacity PIPE Vault 712-S, or equivalent
182 5,450 gallon capacity PIPE Vault 814-8-S, or equivalent
215 6,460 gallon capacity PIPE Vault 818-8-S, or equivalent
NOTE: This sizing is not appropriate for a stormwater quality treatment device. Refer to
Volume V, Chapter 9.
BMPs Applicable to Both Covered and Uncovered Fuel Islands
• Prepare an emergency spill response and cleanup plan (per BMP A714 Spills of Oil
and Hazardous Substances) and have designated trained person(s) available either
on site or on call at all times to promptly and properly implement that plan and
immediately cleanup all spills. Keep suitable cleanup materials, such as dry
adsorbent materials, on site to allow prompt cleanup of a spill.
• Train employees on the proper use of fuel dispensers. Post signs in accordance with
the International Fire Code (IFC). Post “No Topping Off” signs (topping off gas tanks
causes spillage and vents gas fumes to the air). Make sure that the automatic shutoff
on the fuel nozzle is functioning properly.
• The person conducting the fuel transfer must be present at the fueling pump during
fuel transfer, particularly at unattended or self-serve stations.
• Provide suitable containers for waste materials such as oil filters, oil cans, and
garbage.
• Design the fueling island to control spills (a spill control oil/water separator in
compliance with City of Auburn requirements) and to treat collected stormwater
and/or wastewater to required levels. Slope the concrete containment pad around
the fueling island toward drains: trench drains or, catch basins. The slope of the
drains shall not be less than 1 percent (Section 3405.3.8.1 of the IFC). The outlet
from the spill control oil/water separator shall have a shutoff valve, which must be
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 492
closed in the event of a spill. The spill control sump must be sized using standard
engineering practices and shall be based a 25-year storm event when the fueling
area is uncovered; or
• Design the fueling island as a spill containment pad with a sill or berm raised to a
minimum of four inches to prevent the runoff of spilled liquids and to prevent run-on
of stormwater from the surrounding area. Raised sills are not required at the open-
grate trenches that connect to an approved drainage-control system.
• The fueling pad must be paved with Portland cement concrete, or equivalent. Asphalt
is not considered an equivalent material.
• Stormwater collected on the fuel island containment pad must be conveyed to a
sanitary sewer system, as approved by the City of Auburn. In rare cases, stormwater
may be conveyed to the storm drainage system through an approved treatment
system such as an oil/water separator and a basic treatment BMP (basic treatment
BMPs are listed in Volume V and include media filters and biofilters). Discharges
from treatment systems to storm drains or surface water or to the ground must not
display ongoing or recurring visible sheen and must not contain levels of oil and
grease above Water Quality or Model Toxics Control Act criteria.
• Alternatively, stormwater collected on the fuel island containment pad may be
collected and held for proper off site disposal.
• Conveyance of any fuel-contaminated stormwater to a sanitary sewer must be
approved by the City of Auburn. All discharge must meet the criteria specified in
Auburn City Code Chapter 13.20.
• Transfer fuel from the delivery tank truck to the fuel storage tank on an impervious
surface and ensure that appropriate overflow protection is used. Use drip pans under
all hose connections.
Additional BMP for Vehicles 10 feet in height or greater:
A roof or canopy may not be practicable at fueling stations that regularly fuel vehicles that are 10 feet
in height or greater, particularly at industrial sites. At those types of fueling facilities, the following
BMPs apply, as well as all of the other required BMPs and fire code requirements.
• The concrete fueling pad must be equipped with emergency spill control, which may
include an oil/water separator, with a shutoff valve for the drainage from the fueling
area. The valve must be closed in the event of a spill. Spills must be cleaned up and
disposed off-site in accordance with BMP A714 Spills of Oil and Hazardous
Substances.
• Stormwater collected on the fuel island containment pad must be conveyed to a
sanitary sewer system, as approved by the City of Auburn. In rare cases, and only
when approved by the City, stormwater may be conveyed to the storm drainage
system through an approved treatment system such as an oil/water separator and a
basic treatment BMP (basic treatment BMPs are listed in Volume V and include
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 493
media filters and biofilters). Discharges from treatment systems to storm drains or
surface water or to the ground must not display ongoing or recurring visible sheen
and must not contain levels of oil and grease above Water Quality or Model Toxics
Control Act criteria.
An explosive or flammable mixture is defined under state and federal pretreatment regulations, based
on a flash point determination of the mixture. If contaminated stormwater is determined not to be
explosive or flammable, then it could be conveyed to a sanitary sewer system, if approved by the City
of Auburn.
Figure IV-4-8. Surrounding Activities Containing Oversized Equipment
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 494
4.3.3 BMP A203: Vehicle Maintenance Activities
4.3.3.1 Description of Pollutant Sources
This activity applies to businesses and public agencies where fuel filters, engine oil, and other fluids
such as battery acid, coolants, and transmission and brake fluids are removed and replaced in
vehicles and equipment. It also applies to mobile vehicle maintenance operations, such as at
construction sites. Related vehicle maintenance activities are covered under the following activity
headings in this manual, and other BMPs provided in this manual:
A103 Washing, Pressure Washing, and Steam Cleaning of
Vehicles/Equipment/Building Structures
A201 Loading and Unloading Areas for Liquid or Solid Material
A202 Fueling at Dedicated Stations
A204 Mobile Fueling
A307 Painting, Finishing and Coating of Vehicles, Boats, Buildings, and Equipment
A401 Storage or Transfer (Outside) of Solid Raw Materials, By-Products,
or Finished Products
A407 Storage of Liquid, Food Waste, or Dangerous Waste Containers
A408 Storage of Liquids in Permanent Above-ground Tanks
A409 Parking and Storage for Vehicles and Equipment
A714 Spills of Oil and Hazardous Substances
Pollutants of concern include toxic hydrocarbons, toxic organic compounds, oils and greases, pH,
and heavy metals.
4.3.3.2 Pollutant Control Approach
Control of leaks and spills of fluids using good housekeeping and cover and containment BMPs.
4.3.3.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses and agencies engaged in
engine and vehicle repair:
• Employees must be educated about the need for careful handling of automotive
fluids. Employees at businesses or agencies who routinely change or handle these
fluids must be trained in spill response and cleanup procedures. Inspect all incoming
vehicles, parts, and equipment stored temporarily outside for leaks.
• Remove batteries and liquids from vehicles and equipment in designated areas
designed to prevent stormwater contamination. Store cracked batteries in a covered
non-leaking secondary containment system.
• Empty fuel and fuel filters before disposal.
• Spill cleanup materials, such as rags and absorbent materials, must always be kept
close at hand when changing oil and other fluids. Soiled rags and other cleanup
material must be properly disposed of or cleaned and reused.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 495
• Floor drains inside buildings shall connect to sanitary sewer, be routed through an
appropriately sized oil/water separator and shall be approved by the City.
• Do not hose down the maintenance/repair area. Instead, sweep the area weekly to
collect dirt, and wipe up spills with rags and other absorbent materials.
• A bermed tarp, ground cloth, or drip pans must be used beneath the vehicle or
equipment to capture all spills and drips. The collected drips and spills must be
recycled or disposed of properly. See BMP S102 for disposal options.
• If this activity occurs at a stationary business location, the activity area must be
moved indoors. An exception to this requirement would be equipment that is too
large to fit under a roofed area. In this case, the outdoor area must be paved,
provided with a sump drain, and provision made for stormwater run-on prevention.
See BMP S106 and S107 for more on paving, sump drains and holding tanks, and
run-on prevention. Contact the City of Auburn Sanitary Sewer Utility at 253-931-3010
for information on requirements for disposal to sewer. If the site utilizes a septic tank,
sump contents will need to be pumped and disposed of by an oil recycler or
hazardous waste company.
• Recycle oil, antifreeze, batteries, and air conditioning coolant.
• If engine washing is to be performed, then appropriate pretreatment will be required.
Contact the City of Auburn Sanitary Sewer Utility at 253-931-3010 for the
requirements.
• Implement the following treatment BMP in addition to the Required BMPs:
• Contaminated stormwater runoff from vehicle staging and maintenance areas must
be conveyed to an API or CP oil and water separator followed by a basic treatment
BMP (see Volume V), applicable filter, or other equivalent oil treatment system.
4.3.3.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution prevention.
• Drain all fluids from wrecked vehicles and car parts upon arrival. Recover air
conditioning gases.
• Use reusable cloth rags to clean up drips and small spills instead of disposables:
these can be professionally laundered and reused. Do not attempt to launder these
at home or at a coin-op laundry.
• Use absorbent pillows or booms in or around storm drains and catch basins to
absorb oil and fuel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 496
4.3.4 BMP A204: Mobile Fueling of Vehicles and Heavy Equipment
4.3.4.1 Description of Pollutant Sources
Mobile fueling, also known as fleet fueling, wet fueling, or wet hosing, is the practice of filling fuel
tanks of vehicles by tank trucks that are driven to the yards or sites where the vehicles to be fueled
are located. Mobile fueling is only conducted using diesel fuel, as mobile fueling of gasoline is
prohibited. Diesel fuel is considered a Class II Combustible Liquid, whereas gasoline is considered a
Flammable Liquid.
Historically mobile fueling has been conducted for off-road vehicles that are operated for extended
periods of time in remote areas. This includes construction sites, logging operations, and farms.
Mobile fueling of on-road vehicles is also conducted commercially in the State of Washington.
4.3.4.2 Pollutant Control Approach
Proper training of the fueling operator, and the use of spill/drip control and reliable fuel transfer
equipment with backup shutoff valving are typically needed.
4.3.4.3 Required BMPs
Organizations and individuals conducting mobile fueling operations must implement the following
BMPs. The operating procedures for the driver/operator shall be simple, clear, effective and their
implementation verified by the organization that will potentially be liable for environmental and third
party damage.
• Ensure that all mobile fueling operations are approved and permitted by the Valley
Regional Fire Authority and comply with local and Washington State fire codes.
Contact the Valley Regional Fire Authority at 253-931-3060.
• In fueling locations that are in close proximity to sensitive aquifers, designated
wetlands, wetland buffers, or other waters of the State, approval by the City of
Auburn is necessary to ensure compliance with additional local requirements. It shall
be the responsibility of the site owner to obtain approval under this exception. Any
permit holder permitted under this exception shall cover all catch basins prior to
commencing any fueling operations. Sites which are adjacent to designated
wetlands, wetland buffers, streams, or bodies of water shall have on site, in a
marked conspicuous location a minimum of 50 feet of 4-inch diameter, non-water
absorbing containment boom.
• Ensure compliance with all 49 CFR 178 requirements for DOT 406 cargo tanker.
Documentation from a Department of Transportation (DOT) Registered Inspector
shall be proof of compliance.
• Ensure the presence and the constant observation/monitoring by the driver/operator
at the fuel transfer location at all times during fuel transfer and ensure that the
following procedures are implemented at the fuel transfer locations:
o Locate the point of fueling at least 25 feet from the nearest storm drain or
inside an impervious containment area with a volumetric holding capacity
equal to or greater than 110 percent of the receiving tank volume, or place an
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 497
impervious covering over the storm drain to ensure no inflow of spilled or
leaked fuel. Storm drains that convey the inflow to a spill control separator
approved by the City of Auburn and the Valley Regional Fire Authority need
not be covered. Potential spill/leak conveyance surfaces must be impervious
and in good repair.
o Place a drip pan or an absorbent pad under each fueling location prior to and
during all dispensing operations. The pan (must be liquid tight) and the
absorbent pad must have a capacity of 3 gallons. Spills retained in the drip
pan or the pad need not be reported.
o Handle and operate fuel transfer hoses and nozzle, drip pan(s), and
absorbent pads to prevent spills/leaks of fuel from reaching the ground, storm
drains, and receiving waters.
o Do not extend the fueling hoses across a traffic lane without fluorescent traffic
cones, or equivalent devices.
o Remove the fill nozzle and cease filling when the automatic shut-off valve
engages. Do not allow automatic shutoff fueling nozzles to be locked in the
open position.
o Do not “top off” the equipment receiving fuel.
• Provide the driver/operator of the fueling vehicle with:
o Adequate headlamps, flashlights or other mobile lighting to view fill openings
with poor accessibility. Consult with the Valley Regional Fire Authority for
additional lighting requirements.
o Two-way communication with home base.
• Train the driver/operator annually in spill prevention, reporting and cleanup measures
and emergency procedures. Make all employees aware of the significant liability
associated with fuel spills.
• The fueling operation procedures shall be properly signed and dated by the
responsible manager, distributed to the operators, retained in the organization files,
and made available in the event an authorized government agency requests a
review.
• Ensure that the Valley Regional Fire Authority (911) and the Ecology Northwest
Regional Office (425) 649-7000 are immediately notified in the event of any spill
entering surface or groundwaters, including catch basins. Establish a 24-hour “call
down list” to ensure the rapid and proper notification of management and
government officials should any amount of product be spilled on-site. Keep the list in
a protected but readily accessible location in the mobile fueling truck. The “call down
list” shall also pre-identify spill response contractors available in the area to ensure
the rapid removal of significant product spillage into the environment.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 498
• Maintain a minimum of the following spill clean-up materials in all fueling vehicles,
that are readily available for use:
o Non-water absorbents (pads, pillows, sump skimmers) capable of absorbing
15 gallons of diesel fuel;
o A storm drain plug or cover kit;
o A non-water absorbent containment boom of a minimum 10 feet in length with
a 12-gallon absorbent capacity;
o A non-metallic shovel; and
o Two, five-gallon buckets with lids.
o Loose granular absorbent material capable of absorbing a minimum of
5 gallons of diesel. Use only non-water absorbing materials, such as peat
moss, during wet weather conditions.
• Use automatic shutoff nozzles for dispensing the fuel. Replace automatic shut-off
nozzles as recommended by the manufacturer.
• Maintain and replace equipment on fueling vehicles, particularly hoses and nozzles,
at established intervals to prevent failures.
• Do not overfill tanks. Allow room for heat expansion of fuel during warm weather.
• Include the following fuel transfer site components:
o Automatic fuel transfer shut-off nozzles; and
o An adequate lighting system at the filling point.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 499
4.4 Production and Application Activities
4.4.1 BMP A301: Concrete and Asphalt Mixing and Production at Stationary
Sites
4.4.1.1 Description of Pollutant Sources
This activity applies to businesses and agencies that mix raw materials onsite to produce concrete or
asphalt. It also applies to subsequent uses such as pouring concrete structures and making other
concrete or asphalt products. Mobile concrete pouring and asphalt application are covered under
BMP A302. Requirements for stockpiling of raw materials are covered under BMP A401 Storage or
Transfer (Outside) of Solid Raw Materials, By-products or Finished Products.
Pollutants of concern include toxic hydrocarbons, toxic organic compounds, oils and greases, heavy
metals, and pH.
4.4.1.2 Pollutant Control Approach
Cover and contain processes where possible and prevent stormwater run-on and contamination,
where feasible.
Any facility categorized under SIC Code 2951 or SIC Code 3273 may need to comply with Ecology’s
Sand and Gravel General Permit. Contact Ecology at 360-407-6400 for additional information. These
facilities may also be subject to City of Auburn requirements. Contact the City of Auburn Public
Works Department at 253-931-3010 for further information.
4.4.1.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses and public agencies
active in concrete and asphalt mixing and production:
• Eliminate all illicit connections to the storm drainage system. See BMP S101 for a
detailed discussion on identifying and eliminating these connections.
• All process water from production, pouring, and equipment cleaning must be
discharged to a dead-end sump, a process water treatment system, connected to the
sanitary sewer, or recycled. Never wash fresh concrete or concrete mixer washout
into streets, storm drainage systems, streams, or other water bodies.
• A BMP maintenance schedule must be established, maintenance documented, and
employees educated about the need to prevent stormwater contamination through
the use and proper maintenance of BMPs.
• Production and pouring areas must be protected from stormwater run-on. See BMP
S107 for methods of run-on protection.
• Cover the production area for prevention of stormwater run-on. See BMP S104 and
S107 for information on covers and run-on prevention.
• Use absorbent materials or catch basin filters in and around storm drains and catch
basins to filter out contaminants.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 500
4.4.1.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• The production and pouring area should be swept at the end of each work day to
collect loose chunks of aggregate and raw materials for recycling or proper disposal.
See BMP S102 for disposal options.
• Sweep all driveways and gutters that show accumulation of materials to minimize the
amount that could be carried offsite by rain and enter the storm drainage system.
Use of vacuum sweepers is most efficient.
• Asphalt plants should use an oil/water separator to treat stormwater runoff. See
Volume V, Water Quality Treatment BMPs, for more information.
• Pave the mixing, production, and pouring areas. A sump drain in these areas is
probably not advisable due to potential clogging problems, but could be used in a
curing area. Sweep these areas to remove loose aggregate and recycle or dispose
of properly.
• Use storm drain covers or similarly effective containment devices to prevent runoff
from entering the storm drainage system. Accumulations of dirty runoff must be
disposed of properly.
Contact the City of Auburn Storm Drainage Utility at 253-931-3010 for information about water quality
treatment BMPs for these types of operations. Contact the Department of Ecology’s web page for
accepted water quality treatment at http://www.ecy.wa.gov/programs/wq/stormwater/index.html.
The use of any treatment BMP must not result in the violation of groundwater, surface water, or
wastewater standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 501
4.4.2 BMP A302: Concrete Pouring, Concrete Cutting, and Asphalt
Application at Temporary Sites
4.4.2.1 Description of Pollutant Sources
This activity applies to businesses and public agencies that apply asphalt or pour or cut concrete for
building construction and remodeling, road construction, utility projects, sidewalk, curb and gutter
repairs and construction, sealing of driveways and roofs, and other applications. These activities are
typically done on a temporary site-to-site basis where permanent BMP measures do not apply.
Concrete pouring activities can not only severely alter the pH of receiving waters, but slurry from
aggregate washing can harden in storm pipes, thus reducing capacity and creating flooding
problems.
Pollutants of concern include toxic hydrocarbons, toxic organic compounds, oils and greases, heavy
metals, suspended solids, and pH.
4.4.2.2 Pollutant Control Approach
Train employees on proper procedures, sweep or shovel aggregate chunks, collect accumulated
runoff and solids, and wash equipment in designated areas.
4.4.2.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses and agencies doing
concrete pouring and asphalt application at temporary sites:
• Employees must be educated on the pollution hazards of concrete and asphalt
application and cutting.
• Loose aggregate chunks and dust must be swept or shoveled and collected (not
hosed down a storm drain) for recycling or proper disposal at the end of each work
day, especially at work sites such as streets, driveways, parking lots, sidewalks,
curbs, and gutters where rain can readily pick up the loose material and carry it to
the nearest stormwater conveyance. Small amounts of excess concrete, grout, and
mortar can be disposed of in the trash.
• Storm drain covers or similarly effective containment devices must be placed over all
nearby drains at the beginning of each day. Shovel or vacuum slurry and remove
from the site. All accumulated runoff and solids must be collected and properly
disposed (see BMP S102 for disposal options) at the end of each work day, or more
often if necessary.
• Exposed aggregate washing, where the top layer of unhardened concrete is hosed
or scraped off to leave a rough finish, must be done with a mechanism for
containment and collection of the discarded concrete slurry (such as the storm drain
covers mentioned above). The easiest way to contain the washwater is to direct the
washings to a trench in the ground where the water can percolate into the ground
and the solids later covered with soil.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 502
• Cleaning of concrete application and mixing equipment or concrete vehicles on the
work site must be done in a designated area where the rinse water is controlled. The
rinse water must either be collected for proper disposal or put into a trench in the
ground where the water can percolate away and the solids later covered with soil or
recovered and disposed or recycled.
The use of any treatment BMP must not result in the violation of groundwater, surface water, or
drinking water quality standards.
4.4.2.4 Recommended BMPs
The following BMPs are not required but can provide additional pollution prevention:
• Avoid the activity when rain is occurring or expected.
• If possible, portable asphalt mixing equipment should be covered by an awning, a
lean-to, or another simple structure to avoid contact with rain. See BMP S104 for
further details on cover structures.
• Recycle broken concrete and asphalt. Look under Recycling Services in the Yellow
pages of the phone book to find the nearest recycler.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 503
4.4.3 BMP A303: Manufacturing and Post-Processing of Metal Products
4.4.3.1 Description of Pollutant Sources
This activity applies to businesses such as mills, foundries, and fabricators that manufacture or post-
process metal products. A variety of activities such as machining, grinding, soldering, cutting,
welding, quenching, cooling, and rinsing may take place. These businesses may be required to
obtain a National Pollutant Discharge Elimination System (NPDES) permit from the Department of
Ecology or an Industrial Wastewater Discharge Permit from King County-Metro. See Chapter 5 for a
discussion of NPDES requirements and contact the City of Auburn Sanitary Sewer Utility at
253-931-3010 to determine if a wastewater discharge permit is necessary.
NOTE: Painting, finishing and coating of metal products is covered under BMP A307 Painting,
Finishing, and Coating of Vehicles, Boats, Buildings, and Equipment.
Pollutants of concern include toxic organic compounds, heavy metals, oils and greases, pH,
suspended solids, and biological oxygen demand (BOD).
4.4.3.2 Pollutant Control Approach
Cover and contain operations and apply good housekeeping and preventive maintenance practices
to prevent the contamination of stormwater.
4.4.3.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses engaged in metals
manufacturing or post-processing:
• Eliminate illicit connections to the storm drainage system. See BMP S101 for
detailed information on identifying and eliminating illicit connections.
• Process wastewater (including contact cooling water, filter backwash, cooling tower
blowdown, etc.) from this activity, and stormwater runoff from activity areas, must
discharge to a sanitary sewer, holding tank, or process treatment system that would
need an Ecology NPDES Permit for discharge to surface water or storm drain.
Contact the City of Auburn Permit Center at 253-931-3090 to obtain permits for
discharge to the sewer. See BMP S103 for detailed requirements.
• Employees must be educated to control their work with metal products to minimize
pollution.
• The activity area must be swept at the end of each work day to collect and dispose of
metal fragments and product residues properly. See BMP S102 for disposal
alternatives.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 504
4.4.3.4 Recommended BMPs
The following BMPs are not required but can provide additional pollution protection:
• Limit the amount of water used in quenching and rinsing. Recycle used water where
possible.
• Cover the activity area to prevent rain from contacting the process and reduce the
amount of runoff that has to be detained or treated.
• Use a catch basin filter or screen basket insert to capture stray metal particles.
• Implement a program to track purchase and consumption of lubricants, solvents, and
additives. Check with operating managers for an explanation if consumption
increases. Recommend actions if significant equipment leaks or spills are identified.
• Utilize any additional BMPs which are applicable for materials storage and
maintenance activities in your shop.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 505
4.4.4 BMP A304: Wood Treatment Areas
4.4.4.1 Description of Pollutant Sources
Wood treatment includes both anti-staining and wood preserving using pressure processes or by
dipping or spraying. Wood preservatives include creosote, creosote/coal tar, pentachlorophenol,
copper naphthenate, arsenic trioxide, malathion, or inorganic arsenicals such as chromated copper
arsenate, acid copper chromate, chromate zinc chloride, and fluor-chrome-arsenate-phenol. Anti-
staining chemical additives include iodo-prophenyl-butyl carbamate, dimethyl sulfoxide, didecyl
dimethyl ammonium chloride, sodium azide, 8-quinolinol, copper (II) chelate, sodium ortho-
phenylphenate, 2-(thiocyanomethylthio)-benzothiazole (TCMTB) and methylene bis- (thiocyanate),
and zinc naphthenate.
Pollutant sources include drips of condensate or preservative after pressurized treatment, product
washwater (in the treatment or storage areas), spills and leaks from process equipment and
preservative tanks, fugitive emissions from vapors in the process, blowouts and emergency pressure
releases, and kick-back from lumber (phenomenon where preservative leaks as it returns to normal
pressure). Potential pollutants typically include the wood treating chemicals, BOD, suspended solids,
oil and grease, benzene, toluene, ethylbenzene, phenol, chlorophenols, nitrophenols, heavy metals,
and PAH, depending on the chemical additive used.
4.4.4.2 Pollutant Control Approach
Cover and contain all wood treating areas and prevent all leaching of and stormwater contamination
by wood treating chemicals. All wood treating facilities in Washington State are required to be
covered under an individual NPDES Permit and may require an Industrial Wastewater Discharge
Permit from King County-Metro.
4.4.4.3 Required BMPs
The individual NPDES Permit will require the following BMPs at a minimum:
• Dedicate equipment that is used for treatment activities to prevent the tracking of
treatment chemicals to other areas on the site.
• Eliminate non-process traffic on the drip pad. Scrub down non-dedicated lift trucks on
the drip pad.
• Immediately remove and properly dispose of soils with visible surface contamination
(green soil) to prevent the spread of chemicals to groundwater and/or surface water
via stormwater runoff.
• If any wood is observed to be contributing chemicals to the environment in the
treated wood storage area, relocate it on a concrete chemical containment structure
until the surface is clean and until it is drip free and surface dry.
• Cover and/or enclose, and contain with impervious surfaces, all wood treatment
areas. Slope and drain areas around dip tanks, spray booths, retorts, and any other
process equipment in a manner that allows return of treatment chemicals to the
wood treatment process.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 506
• Cover storage areas for freshly treated wood to prevent contact of treated wood
products with stormwater. Segregate clean stormwater from process water. Ensure
that all process water is conveyed to an approved treatment system.
• Seal any holes or cracks in the asphalt areas that are subject to wood treatment
chemical contamination.
• Elevate stored, treated wood products to prevent contact with stormwater run-on and
runoff.
• Place dipped lumber over the dip tank or on an inclined ramp for a minimum of
30 minutes to allow excess chemical to drip back to the dip tank.
• Place treated lumber either from dip tanks or retorts in a covered paved storage area
for at least 24 hours before placement in outside storage. Use a longer storage
period during cold weather unless the temporary storage building is heated. The
wood shall be drip free and surface dry before it is moved outside.
4.4.4.4 Recommended BMP
Consider using preservative chemicals that do not adversely impact receiving surface water and
groundwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 507
4.4.5 BMP A305: Commercial Composting
4.4.5.1 Description of Pollutant Sources
Commercial compost facilities operating outside without cover require large areas to decompose
wastes and other feedstocks. These facilities should be designed to separate stormwater from
leachate (i.e., industrial wastewater) to the greatest extent possible. When stormwater is allowed to
contact any active composting areas, including waste receiving and processing areas, it becomes
leachate. Pollutants in leachate include nutrients, biochemical oxygen demand (BOD), organics,
coliform bacteria, acidic pH, color, and suspended solids. Stormwater at a compost facility consists of
runoff from areas at the facility that are not associated with active processing and curing, such as
product storage areas, vehicle maintenance areas, and access roads.
4.4.5.2 NPDES Permit Requirements
Discharge of leachate from a compost facility will require a State or NPDES permit from Ecology,
depending on the disposal method chosen for managing leachate at the facility (see the Ecology
website www.ecy.wa.gov/programs/swfa/compost ). An additional alternative, zero discharge, is
possible by containing all leachate from the facility (in tanks or ponds) or preventing production of
leachate (by composting under a roof or in an enclosed building).
4.4.5.3 Pollutant Control Approach
Consider the leachate control specified on the Ecology website:
www.ecy.wa.gov/programs/swfa/compost or zero discharge of leachate.
4.4.5.4 Required BMPs
• Ensure that the compost feedstocks do not contain dangerous wastes regulated
under Chapter 173-303 WAC or hazardous products of a similar nature or solid
wastes that are not beneficial to the composting process. Employees must be trained
to screen these materials in incoming wastes.
• Contact other federal, state, and City of Auburn departments with environmental or
zoning authority for applicable permit and regulatory information. County Health
Departments are responsible for issuing solid waste handling permits for commercial
compost facilities.
• Apply for coverage under the General Permit to Discharge Stormwater Associated
with Industrial Activities if the facility discharges stormwater to surface water or a
municipal stormwater system. If all stormwater from the facility infiltrates into the
surrounding area, the General Permit is not required.
• Develop a plan of operations as outlined in the Composting Facility Standards
(WAC 173-350-220).
• Store finished compost in a manner to prevent contamination of stormwater.
• Compost pads are required for all uncovered facilities in areas of the state with wet
climates (per water quality regulations).
• Provide curbing for all compost pads to prevent stormwater run-on and leachate
run-off.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 508
• Slope all compost pads sufficiently to direct leachate to the collection device.
• Provide one or more sumps or catch basins capable of collecting all leachate
generated by the design storm and conveying it to the leachate holding structure for
all compost pads.
• Convey all leachate from composting operations to a sanitary sewer, holding tank, or
on-site treatment system designed to treat the leachate. Discharge of leachate to the
sanitary sewer may require an Industrial Wastewater Discharge Permit. Contact the
City of Auburn Sanitary Sewer Utility at 253-931-3010 for a determination.
• Ponds used to collect, store, or treat leachate and other contaminated waters
associated with the composting process must be lined to prevent groundwater
contamination. Apply “AKART” or All Known Available and Reasonable Methods of
Prevention and Treatment to all pond liners, regardless of the construction materials.
Refer to “Compost Facility Resource Handbook, Guidance for Washington State,” November 1998,
Publication # 97-502, for additional design criteria and information.
4.4.5.5 Recommended BMPs
• Clean up debris from yard areas regularly.
• Locate stored residues in areas designed to collect leachate.
• Limit storage times of residues to prevent degradation and generation of leachate.
• Consider using leachate as make-up water in early stages of the composting
process. Since leachate can contain pathogenic bacteria, care should be taken to
avoid contaminating finished product or nearly finished product with leachate.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 509
4.4.6 BMP A306: Landscaping and Lawn/Vegetation Management
4.4.6.1 Description of Pollutant Sources
Landscaping can include grading, soil transfer, vegetation removal, pesticide and fertilizer application,
and watering. Stormwater contaminants include toxic organic compounds, heavy metals, oils, total
suspended solids, coliform bacteria, fertilizers, and pesticides.
Lawn and vegetation management can include control of objectionable weeds, insects, mold,
bacteria, and other pests with chemical pesticides and is conducted commercially at commercial,
industrial, and residential sites. Examples include weed control on golf course lawns, access roads,
and utility corridors and during landscaping; sap stain and insect control on lumber and logs; rooftop
moss removal; killing nuisance rodents; fungicide application to patio decks; and residential
lawn/plant care. Toxic pesticides such as pentachlorophenol, carbamates, and organometallics can
be released to the environment by leaching and dripping from treated parts, container leaks, product
misuse, and outside storage of pesticide contaminated materials and equipment. Poor management
of the vegetation, poor application of pesticides or fertilizers, and non-targeted irrigation water or over
watering can cause appreciable stormwater contamination.
4.4.6.2 Pollutant Control Approach
Control of fertilizer and pesticide applications, soil erosion, and site debris to prevent contamination of
stormwater.
Develop and implement an Integrated Pest Management Plan (IPM) and use pesticides only as a
last resort. Refer to Volume IV, Appendix C – Example of an Integrated Pest Management Program
for more information. If pesticides/herbicides are used they must be carefully applied in accordance
with label instructions on U.S. Environmental Protection Agency (EPA) registered materials. Maintain
appropriate vegetation, with proper fertilizer application where practicable, to control erosion and the
discharge of stormwater pollutants. Where practicable, grow plant species appropriate for the site, or
adjust the soil properties of the subject site to grow desired plant species.
4.4.6.3 Required BMPs for Landscaping
• Install engineered soil/landscape systems to improve the infiltration and regulation of
stormwater in landscaped areas.
• Do not dispose of collected vegetation into wetlands, waterways or storm drainage
systems.
4.4.6.4 Recommended BMPs for Landscaping
• Conduct mulch-mowing whenever practicable.
• Dispose of grass clippings, leaves, sticks, or other collected vegetation by
composting, if feasible.
• Collect all clippings, leaves, bark, and trimmings blown onto the sidewalk or street.
Do not leave this material in the gutter or where it can be washed into the storm
drainage system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 510
• Use mulch or other erosion control measures when soils are exposed for more than
one week during the dry season or two days during the rainy season.
• If oil or other chemicals are handled, store and maintain appropriate oil and chemical
spill cleanup materials in readily accessible locations. Ensure that employees are
familiar with proper spill cleanup procedures.
• Till fertilizers into the soil rather than dumping or broadcasting onto the surface.
Determine the proper fertilizer application for the types of soil and vegetation
encountered.
• Till a topsoil mix or composted organic material into the soil to create a well-mixed
transition layer that encourages deeper root systems and drought-resistant plants.
• Use manual and/or mechanical methods of vegetation removal rather than applying
herbicides, where practical.
• Target irrigation water on vegetated areas and limit irrigation time to reduce the
potential of carrying fertilizers and pesticides off-site.
4.4.6.5 Required BMPs for the Use of Pesticides
• Develop and implement an integrated pest management system (IPM) (See section
on IPM at end of BMP) and use pesticides only as a last resort.
• Implement a pesticide-use plan and include at a minimum: a list of selected
pesticides and their specific uses; brands, formulations, application methods, and
quantities to be used; equipment use and maintenance procedures; safety, storage,
and disposal methods; and monitoring, record keeping, and public notice
procedures. All procedures shall conform to the requirements of Chapter 17.21 RCW
and Chapter 16-228 WAC (Appendix 4 – D.R.7).
• Choose the least toxic pesticide available that is capable of reducing the infestation
to acceptable levels. The pesticide should readily degrade in the environment and/or
have properties that strongly bind it to the soil. Any pest control used should be
conducted at the life stage when the pest is most vulnerable. Any method used
should be site-specific and not used wholesale over a wide area.
• Apply the pesticide according to label directions. Under no conditions shall pesticides
be applied in quantities that exceed manufacturer’s instructions.
• Mix the pesticides and clean the application equipment in an area where accidental
spills will not enter surface or groundwaters, and will not contaminate the soil.
• Store pesticides in enclosed areas or in covered impervious containment. Ensure
that pesticide contaminated stormwater or spills/leaks of pesticides are not
discharged to storm drains. Do not hose down paved areas to a storm drain or
conveyance ditch. Store and maintain appropriate spill cleanup materials in a
location known to all near the storage area.
• Clean up any spilled pesticides and ensure that the pesticide contaminated waste
materials are kept in designated covered and contained areas.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 511
• The pesticide application equipment must be capable of immediate shutoff in the
event of an emergency.
• Do not spray pesticides within 100 feet of open waters including wetlands; ponds;
and streams, sloughs, and any drainage ditch or channel that leads to open water,
except when approved by Ecology or by the City of Auburn. All sensitive areas
including wells, creeks, and wetlands must be flagged prior to spraying.
• As required by the City of Auburn or by Ecology, complete public posting of the area
to be sprayed prior to the application.
• Spray applications should only be conducted during weather conditions as specified
in the label direction and applicable local and state regulations. Do not apply during
rain or immediately before expected rain.
4.4.6.6 Recommended BMPs for the use of Pesticides
• Consider alternatives to the use of pesticides such as covering or harvesting weeds,
substitute vegetative growth, and manual weed control/moss removal.
• Consider the use of soil amendments, such as compost, that are known to control
some common diseases in plants, such as Pythium root rot, ashy stem blight, and
parasitic nematodes. The following are three possible mechanisms for disease
control by compost addition (USEPA Publication 530-F-9-044):
o Successful competition for nutrients by antibiotic production;
o Successful predation against pathogens by beneficial microorganism; and
o Activation of disease-resistant genes in plants by composts.
Installing an amended soil/landscape system can preserve both the plant system and the soil
system more effectively. This type of approach provides a soil/landscape system with
adequate depth, permeability, and organic matter to sustain itself and continue working as an
effective stormwater infiltration system and a sustainable nutrient cycle.
• Once a pesticide is applied, its effectiveness should be evaluated for possible
improvement. Records should be kept showing the applicability and inapplicability of
the pesticides considered.
• An annual evaluation procedure should be developed including a review of the
effectiveness of pesticide applications, impact on buffers and sensitive areas
(including potable wells), public concerns, and recent toxicological information on
pesticides used/proposed for use. If individual or public potable wells are located in
the proximity of commercial pesticide applications, contact the regional Ecology
hydrologist to determine if additional pesticide application control measures are
necessary.
• Rinsate from equipment cleaning and/or triple-rinsing of pesticide containers should
be used as product or recycled into product.
For more information, contact the WSU Extension Home-Assist Program at 253-445-4556; Bio-
Integral Resource Center (BIRC), P.O. Box 7414, Berkeley, CA 94707; or the Washington
Department of Ecology to obtain “Hazardous Waste Pesticides” (Publication #89-41); contact EPA to
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 512
obtain a publication entitled “Suspended, Canceled and Restricted Pesticides” which lists all
restricted pesticides and the specific uses that are allowed. Valuable information from these sources
may also be available on the internet.
4.4.6.7 Required BMPs for Vegetation Management
• Use at least an eight-inch topsoil layer with at least 8 percent organic matter to
provide a sufficient vegetation–growing medium.
• Select the appropriate turf grass mixture for climate and soil type based on
recommendations from a licensed landscape architect.
• Selection of desired plant species can be made by adjusting the soil properties of the
subject site. For example, a constructed wetland can be designed to resist the
invasion of reed canary grass by layering specific strata of organic matters (e.g.,
compost forest product residuals) and creating a mildly acidic pH and carbon-rich soil
medium. Consult a soil restoration specialist for site-specific conditions.
• Aerate lawns regularly in areas of heavy use, where the soil tends to become
compacted. Aeration shall be conducted while the grasses in the lawn are growing
most vigorously. Remove layers of thatch greater than ¾-inch deep.
• Set the mowing height at the highest acceptable level and mow at times and
intervals designed to minimize stress on the turf. Generally mowing only 1/3 of the
grass blade height will prevent stressing the turf.
4.4.6.8 Fertilizer Management:
• Fertilization needs vary by site depending on plant, soil, and climatic conditions.
Evaluation of soil nutrient levels through regular testing ensures the best possible
efficiency and economy of fertilization. For details on soils testing, contact the Pierce
Conservation District or Cooperative Extension Service.
• Fertilizers shall be applied in amounts appropriate for the target vegetation and at the
time of year that minimizes losses to surface and groundwaters. Do not fertilize
during a drought or when the soil is dry. Alternatively, do not apply fertilizers within
three days prior to predicted rainfall. The longer the period between fertilizer
application and either rainfall or irrigation, the less fertilizer runoff occurs.
• Use slow release fertilizers such as methylene urea, IDBU, or resin coated fertilizers
when appropriate, generally in the spring. Use of slow release fertilizers is especially
important in areas with sandy or gravelly soils.
• Time the fertilizer application to periods of maximum plant uptake. Generally fall and
spring applications are recommended.
• Properly trained persons shall apply all fertilizers. Fertilizers shall not be applied to
grass swales, filter strips, or buffer areas that drain to surface water bodies.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 513
4.4.6.9 Integrated Pest Management
An IPM program might consist of the following steps:
1. Correctly identify problem pests and understand their life cycle.
2. Establish tolerance thresholds for pests.
3. Monitor to detect and prevent pest problems.
4. Modify the maintenance program to promote healthy plants and discourage pests.
5. Use cultural, physical, mechanical, or biological controls first if pests exceed the
tolerance thresholds.
6. Evaluate and record the effectiveness of the control and modify maintenance practices
to support lawn or landscape recovery and prevent recurrence.
For an elaboration of these steps refer to Volume IV, Appendix C – Example of an Integrated Pest
Management Program.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 514
4.4.7 BMP A307: Painting, Finishing and Coating of Vehicles, Boats, Buildings
and Equipment
4.4.7.1 Description of Pollutant Sources
Surface preparation and the application of paints, finishes, and/or coatings to vehicles, boats,
buildings, and/or equipment outdoors can be sources of pollutants. Potential pollutants include
organic compounds, oils and greases, heavy metals, and suspended solids.
4.4.7.2 Pollutant Control Approach
Cover and contain painting and sanding operations and apply good housekeeping and preventive
maintenance practices to prevent the contamination of stormwater with painting overspray and grit
from sanding.
4.4.7.3 Required BMPs
• Train employees in the careful application of paints, finishes, and coatings to reduce
misuse and over spray. Use ground or drop cloths or temporary berms underneath
outdoor painting, scraping, sandblasting work, and properly clean and temporarily
store collected debris daily.
• Do not conduct spraying, blasting, or sanding activities over open water or where
wind may blow paint into water.
• Wipe up spills with rags and other absorbent materials immediately. Do not hose
down the area to a storm drain, receiving water, or conveyance ditch to receiving
water.
• On dock areas, sweep or vacuum rather than hose down debris. Collect any hose
water generated and convey to appropriate treatment and disposal.
• Use a storm drain cover, filter fabric, or similarly effective runoff control device if dust,
grit, washwater, or other pollutants may escape the work area and enter a catch
basin. The containment device(s) must be in place at the beginning of the workday.
Collect contaminated runoff and solids and properly dispose of such wastes before
removing the containment device(s) at the end of the workday.
• Use a ground cloth, pail, drum, drip pan, tarpaulin, or other protective device (e.g.
plastic wading pool) for activities such as paint mixing and tool cleaning outside or
where spills can contaminate stormwater.
• Properly dispose of all wastes and prevent all uncontrolled releases to the air,
ground, or water.
• Clean brushes and tools covered with non-water-based paints, finishes, or other
materials in a manner that allows collection of used solvents (e.g., paint thinner,
turpentine, xylol, etc.) for recycling or proper disposal.
• Store toxic materials under cover (tarp, etc.) during precipitation events and when
not in use to prevent contact with stormwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 515
• Enclose and/or contain all work while using a spray gun or conducting sand blasting
and in compliance with applicable air pollution control, OSHA, and WISHA
requirements. Do not conduct outside spraying, grit blasting, or sanding activities
during windy conditions which render containment ineffective.
4.4.7.4 Recommended BMPs
• Clean paintbrushes and tools covered with water-based paints in sinks connected to
sanitary sewers or in portable containers that can be dumped into a sanitary sewer
drain.
• Recycle paint, paint thinner, solvents, pressure wash water, and any other recyclable
materials.
• Use efficient spray equipment such as electrostatic, air-atomized, high volume/low
pressure, or gravity feed spray equipment.
• Purchase recycled paints, paint thinner, solvents, and other products if feasible.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 516
4.4.8 BMP A308: Commercial Printing Operations
4.4.8.1 Description of Pollutant Sources
Materials used in the printing process include inorganic and organic acids, resins, solvents, polyester
film, developers, alcohol, vinyl lacquer, dyes, acetates, and polymers. Waste products may include
waste inks and ink sludge, resins, photographic chemicals, solvents, acid and alkaline solutions,
chlorides, chromium, zinc, lead, spent formaldehyde, silver, plasticizers, and used lubricating oils. As
the printing operations are conducted indoors, the only likely points of potential contact with
stormwater are the outside temporary waste material storage area and area where chemicals are
offloaded at external unloading bays. Pollutants can include TSS, pH, heavy metals, oil and grease,
and COD.
4.4.8.2 Pollutant Control Approach
Ensure appropriate disposal and NPDES permitting of process wastes. Cover and contain stored raw
and waste materials.
4.4.8.3 Required BMPs
• Discharge process wastewaters to a sanitary sewer (if approved by the City of
Auburn) or to an approved process wastewater treatment system. Contact the City of
Auburn Sanitary Sewer Utility at 253-931-3010 for discharge requirements.
• Do not discharge process wastes or wastewaters into storm drains or surface water.
• Determine whether any of these wastes qualify for regulation as dangerous wastes
and dispose of them accordingly.
• Store raw materials or waste materials that could contaminate stormwater in covered
and contained areas.
4.4.8.4 Recommended BMPs
• Train all employees in pollution prevention, spill response, spill reporting, and
environmentally acceptable materials handling procedures.
• Store materials in proper, appropriately labeled containers. Identify and label all
chemical substances.
• All stormwater management devices should be inspected regularly and maintained
as necessary.
• Try to use press washes without listed solvents, and with the lowest VOC content
possible. Do not evaporate ink cleanup trays to the outside atmosphere.
• Place cleanup sludges into a properly labeled container with a tight lid and dispose of
as hazardous waste. Do not dispose of cleanup sludges in the garbage or in
containers of soiled towels.
For additional information on pollution prevention the following Washington Department of Ecology
publications are recommended: A Guide for Screen Printers, Publication #94-137 and A Guide for
Lithographic Printers, Publication #94-139.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 517
4.4.9 BMP A309: Manufacturing Operations – Outside
4.4.9.1 Description of Pollutant Sources
Manufacturing pollutant sources include outside process areas, stack emissions, and areas where
manufacturing activity has taken place in the past and significant pollutant materials remain and are
exposed to stormwater.
4.4.9.2 Pollution Control Approach
Cover and contain outside manufacturing and prevent stormwater run-on and contamination, where
feasible.
4.4.9.3 Required BMPs
• Sweep paved areas regularly, as needed, to prevent contamination of stormwater.
Vacuum sweeping is preferred.
• Alter the activity by eliminating or minimizing the contamination of stormwater.
• Enclose the activity (see Figure IV-4-9). If possible, enclose the manufacturing
activity in a building.
• Cover the activity and connect floor drains to a sanitary sewer, if approved by the
City of Auburn. Berm or slope the floor as needed to prevent drainage of pollutants to
areas outside (see Figure IV-4-10).
• Isolate and segregate pollutants, as feasible. Convey the segregated pollutants to a
sanitary sewer, process treatment, or dead-end sump, depending on available
methods and applicable permit requirements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 518
Figure 4.7 – Enclose the Activity
Figure IV-4-9. Enclose the Activity
Figure 4.8 – Cover the Activity
Figure IV-4-10. Cover the Activity
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 519
4.5 Storage and Stockpiling Activities
4.5.1 BMP A401: Storage or Transfer (Outside) of Solid Raw Materials, By-
Products or Finished Products
4.5.1.1 Description of Pollutant Sources
Solid raw materials, by-products, or products such as gravel, sand, salts, topsoil, compost, logs,
sawdust, wood chips, lumber and other building materials, concrete, and metal products are typically
stored outside in large piles, stacks, etc. at commercial or industrial establishments. Contact of
outside bulk materials with stormwater can cause leachate and/or erosion of the stored materials.
Contaminants may include TSS, BOD, organics, and dissolved salts (sodium, calcium, magnesium
chloride, etc).
4.5.1.2 Pollutant Control Approach
Provide impervious containment with berms, dikes, etc. and/or cover to prevent run-on and discharge
of leachate, pollutant(s) and TSS.
4.5.1.3 Required BMPs
• Do not hose down the contained stockpile area to a storm drain or other conveyance
leading to a storm drain or receiving water.
• Choose one or more of the source control BMP options listed below for stockpiles
greater than 5 cubic yards of erodible or water soluble materials such as soil, road
deicing salts, compost, unwashed sand and gravel, sawdust, etc. or for outside
storage areas for solid materials such as logs, bark, lumber, metal products, etc.:
o Store in a building or paved and bermed covered area as shown in Figure IV-
4-11.
o Place temporary plastic sheeting (polyethylene, polypropylene, hypalon, or
equivalent) over the material as shown in Figure IV-4-12.
OR
o Pave the area and install a stormwater drainage system. Place curbs or
berms along the perimeter of the area to prevent the run-on of unconta-
minated stormwater and to collect and convey runoff to treatment. Slope the
paved area in a manner that minimizes contact between stormwater (e.g.,
pooling) and leachable materials in compost, logs, bark, wood chips, etc.
o For large stockpiles that cannot be covered, implement containment practices
at the perimeter of the site and at any catch basins as needed to prevent
erosion and discharge of the stockpiled material offsite or to a storm drain.
Ensure that contaminated stormwater is not discharged directly to catch
basins without being conveyed through a treatment BMP. For log yards see
Ecology publication “Industrial Stormwater General Permit Implementation
Manual for Log Yards:, publication # 04-10-031.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 520
o Convey contaminated stormwater from the stockpile area to a wet pond, wet
vault, settling basin, media filter, or other appropriate treatment system,
depending on the contaminate.
Figure IV-4-11. Covered Storage Area for Bulk Solids (including berm if needed)
4.5.1.4 Recommended BMPs
• Maintain drainage areas in and around storage of solid materials with a minimum
slope of 1.5 percent to prevent pooling and minimize leachate formation. Areas
should be sloped to drain stormwater to the perimeter where it can be collected, or to
internal drainage “alleyways” where material is not stockpiled.
• Sweep paved storage areas regularly for collection and disposal of loose solid
materials.
• If and when feasible, collect and recycle water-soluble materials (leachates) to the
stockpile.
• Stock cleanup materials such as brooms, dustpans, and vacuum sweepers near the
storage area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 521
Figure IV-4-12. Material Covered with Plastic Sheeting
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 522
4.5.2 BMP A402: Storage and Treatment of Contaminated Soils
4.5.2.1 Description of Pollutant Sources
This activity applies to businesses and agencies that store and treat soils contaminated with toxic
organic compounds, petroleum products, or heavy metals. Stormwater runoff that comes in contact
with contaminated soil can carry those contaminants along with loose dirt into receiving waters.
4.5.2.2 Pollutant Control Approach
Ecology regulates businesses disposing and treating contaminated soil. A permit from the Puget
Sound Clean Air Agency is required if the treatment method for removing soil contaminants involves
forcing air through, or sucking air from, the soil. In addition, a Special Approved Discharge
Authorization from the Metro-King County may be required if potentially contaminated water is to be
discharged from the site. The Puget Sound Clean Air Agency can be reached at 1-800-552-3565.
Contact the City of Auburn Sanitary Sewer Utility at 253-931-3010.
4.5.2.3 Required BMPs
The BMPs included here are intended as a supplement to other regulations. The following BMPs or
equivalent measures are required of all businesses engaged in storage and treatment of
contaminated soils:
• The storage area for contaminated soils must be enclosed indoors, covered, or
contained by a curb, dike, or berm constructed around the material storage area. If the
contaminated soils are covered, stormwater run-on protection must also be provided.
BMP S107 provides further details on containment and run-on prevention.
• Employees must be educated on methods to prevent contamination from leaving the site.
• Cleanup materials must be stocked near the storage area.
• Gutters, storm drains, catch basins, and other drainage system features on the site
must be cleaned following the completion of site work, or at least once per year,
whichever comes first. Sediments from such cleaning must be disposed of properly.
See BMP S109 and S102 for details on catch basin cleaning and disposal options.
4.5.2.4 Recommended BMPs
The following BMPs are not required but can provide additional pollution protection:
• If feasible, the storage area should be swept weekly for collection of stray soil, which
can be added back to the piles or properly disposed. See BMP S102 for information on
disposal options.
• Implement one of the following treatment BMPs in conjunction with a runoff
containment plan:
o Vegetated biofilter.
o Equivalent BMP for the targeted pollutant (see Volume V).
The use of any treatment BMP must not result in the violation of groundwater, surface water,
wastewater, or drinking water quality standards.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 523
4.5.3 BMP A403: Temporary Storage or Processing of Fruits or Vegetables
4.5.3.1 Description of Pollutant Sources
This activity applies to businesses that temporarily store fruits and vegetables outdoors prior to
processing or sale, or that crush, cut, or shred fruits or vegetables for wines, frozen juices, and other
food and beverage products. These businesses may include farmers markets, fruit and vegetable
stands, and fruit and vegetable processors. Nutrients and soil washing off of fruit and vegetables can
have a detrimental effect on receiving waters.
Pollutants of concern include nutrients, suspended solids, biochemical oxygen demand (BOD), and
color.
4.5.3.2 Pollutant Control Approach
Store and process fruits and vegetables indoors or under cover whenever possible. Educate
employees about proper procedures. Eliminate illicit connections to the storm drainage system.
Cover and contain operations and apply good housekeeping and preventive maintenance practices
to prevent the contamination of stormwater.
4.5.3.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses engaged in storage of
fruits or vegetables:
• Employees must be educated on benefits of keeping a clean storage area.
• Eliminate illicit connections to the storm drainage system. See BMP S101 for details
on detecting and eliminating these connections.
• Water used to clean produce or other liquid wastes cannot enter the storm drainage
system unless treated. Minimize the use of water when cleaning produce to avoid
excess runoff.
• Cleanup materials, such as brooms and dustpans, must be kept near the storage area.
• Gutters, storm drains, and catch basins on the property must be cleaned as needed.
See BMP S109 for details on catch basin cleaning requirements.
The following BMPs or equivalent measures are required of all businesses that process fruits or
vegetables:
• Eliminate illicit connections to the storm drainage system. See BMP S101 for details
on detecting and eliminating these connections.
• Employees must be educated on benefits of keeping a clean processing area.
• Cleanup materials, such as brooms, dustpans, and shovels, must be kept near the
storage area.
• The processing area must be swept or shoveled daily to collect dirt and fruit and
vegetable fragments for proper disposal.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 524
• The processing area must be enclosed in a building or shed, or covered with
provisions for stormwater run-on prevention. See BMP S104, S105, and S107 for more
on covering and run-on prevention.
OR
The processing area must be paved and sloped to a sanitary sewer drain, holding tank,
or process treatment system collection drain, and stormwater run-on prevention must be
provided for the processing area. Call the Auburn Permit Center at 253-931-3090 for
information on discharging to the sanitary sewer. See BMP S106 and S103 for details on
paving and drainage.
4.5.3.4 Recommended BMPs
The following BMPs are not required but can provide additional pollution protection:
• Cover storage areas for fruits and vegetables. See BMP S104 and S105 for more
details on coverings.
• A containment curb, dike, or berm can be used to prevent offsite runoff from storage or
processing areas and also to prevent stormwater run-on. See BMP S107 for more
information. Note that run-on prevention is required for processing areas, but not for
storage areas.
• The storage area should be swept or shoveled daily to collect dirt and fruit and
vegetable fragments for proper disposal. Keep hosing to a minimum.
• Use one or a combination of the following treatment BMPs:
o Wet pond or wet vault to treat storage area runoff.
o Vegetated biofilter to treat storage area runoff.
o Catch basin with appropriate insert for the targeted pollutants to treat storage
area runoff. See S109 for information on catch basin cleaning.
o Equivalent BMP (see Volume V).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 525
4.5.4 BMP A404: Storage of Solid Wastes and Food Wastes
4.5.4.1 Description of Pollutant Sources
This activity applies to facilities such as hospitals, restaurants, meat and seafood markets,
veterinarian clinics, schools, grocery stores, assisted living centers, and group assembly halls that
store solid wastes and food wastes outdoors. This includes ordinary garbage. If improperly stored,
these wastes can contribute a variety of different pollutants to stormwater. Requirements for handling
and storing solid waste may include a permit from the local health departments; Tacoma-Pierce
County Health Department or Seattle-King County Health Department
NOTE: Dangerous solid wastes must be stored and handled under special guidelines. Businesses
and agencies that store dangerous wastes must follow specific regulations outlined by the
Department of Ecology. Ecology regulations are outlined in Volume IV, Chapter 5. Please contact the
Department of Ecology at 360-407-6300 for the specific requirements and permitting information.
Pollutants of concern include toxic organic compounds, oils and greases, heavy metals, nutrients,
suspended solids, chemical oxygen demand (COD), and biochemical oxygen demand (BOD).
4.5.4.2 Pollutant Control Approach
Store wastes in suitable containers with leak-proof lids. Sweep or shovel loose solids. Educate
employees about the need to check for and replace leaking containers.
4.5.4.3 Required BMPs
The following BMPs are required of all businesses and public agencies engaged in storage of non-
dangerous solid wastes or food wastes:
• All solid and food wastes must be stored in suitable containers. Piling of wastes
without any cover is prohibited.
• Waste storage areas and trash enclosures for food or liquid bearing wastes must be
connected to the sanitary sewer and bermed or sloped to prevent stormwater run-on.
• Trash compactors or dumpsters for food or liquid-bearing wastes shall drain to the
sanitary sewer system and be designed as required by the City of Auburn.
• Storage containers must be checked for leaks and replaced if they are leaking,
corroded, or otherwise deteriorating. If storage containers contain liquid wastes of any
kind, then the container shall be located on a pad equipped with a drainage system
connected to the City sanitary sewer.
• Storage containers must have leak-proof lids or be covered by some other means.
Lids must be kept closed at all times. This is especially important for dumpsters, as
birds can pick out garbage and drop it, promoting rodent, health, and stormwater
problems.
OR
• If lids cannot be provided for the waste containers, or they cannot otherwise be
covered, there is another option: a designated waste storage area must be provided
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 526
with a containment berm, dike, or curb, and the designated area must drain to a
sanitary sewer or holding tank for further treatment. See BMP S107 and S103 for more
information.
• Do not completely fill containers of waste grease and oil. Leave a minimum of four
inches of freeboard to prevent spills when the containers are moved or handled for
recycling.
• Employees must be trained to check storage containers frequently for leaks and to
ensure that the lids are on tightly.
• The waste storage area must be swept or otherwise cleaned frequently to collect all
loose solids for proper disposal in a storage container. Do not hose the area to collect
or clean solids.
• If containers are cleaned, all rinse water from cleaning must be disposed of in a
sanitary sewer or septic system.
• Inspect regularly and clean out catch basins on the property that receive drainage from
waste storage area. See BMP S109 for details on catch basin cleaning.
4.5.4.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• If the amount of waste accumulated appears to frequently exceed the capacity of the
storage container, then another storage container should be obtained and utilized.
• Store containers such that wind will not be able to knock them over.
• Designate a storage area, pave the area, and slope the drainage to a holding tank or
sanitary sewer drain. If a holding tank is used, the contents must be pumped out
before the tank is full and properly disposed. See BMP S102 for more information on
disposal options.
• Compost appropriate wastes. Contact Auburn Solid Waste and Recycling Utility
Recycling at 253-931-3038 for more information on composting.
• Recycle solid wastes. The Industrial Materials Exchange (IMEX) program facilitates
the transfer of excess materials and wastes to those who can use them. IMEX can be
reached at 206-296-4899, or use the IMEX computer bulletin board modem access
number at 1-800-858-6625.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 527
4.5.5 BMP A405: Recyclers and Scrap Yards
4.5.5.1 Description of Pollutant Sources
Includes businesses that reclaim various materials for resale or for scrap, such as vehicles and
vehicle/ equipment parts, construction materials, metals, computers, appliances, beverage
containers, and papers.
Potential sources of pollutants include paper, plastic, metal scrap debris, engines, transmissions,
radiators, batteries, and other materials that contain fluids or are contaminated with fluids. Other
pollutant sources include leachate from metal components, contaminated soil, and the erosion of soil.
Activities that can generate pollutants include the transfer, dismantling, and crushing of vehicles and
scrap metal; the transfer and removal of fluids; maintenance and cleaning of vehicles, parts, and
equipment; and storage of fluids, parts for resale, solid wastes, scrap parts, and materials, equipment
and vehicles that contain fluids, generally in uncovered areas.
Potential pollutants typically found at vehicle recycle and scrap yards include oil and grease, ethylene
and propylene glycol, total suspended solids, BOD, heavy metals, and acidic pH.
4.5.5.2 Required BMPs
For facilities subject to Ecology’s Industrial Stormwater General Permit refer to BMP Guidance
Document #94-146, “Vehicle Recyclers: A Guide to Implementing the Industrial Stormwater General
National Pollutant Discharge Elimination System (NPDES) Permit Requirements”, Washington
Department of Ecology, January 2006 for selection of BMPs. The BMPs in that guidance document
can also be applied to scrap material recycling facilities (depending on the pollutant sources existing
at those facilities) and to non-permitted facilities.
Contact the City of Auburn Public Works Department at 253-931-3010 if contact stormwater or
process wastewater is to be discharged from your site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 528
4.5.6 BMP A406: Treatment, Storage or Disposal of Dangerous Wastes
This activity applies to businesses and public agencies that are permitted by the Washington State
Department of Ecology (DOE) to treat, store, or dispose of dangerous wastes. DOE regulates these
facilities with specific requirements, which include the need for a National Pollutant Discharge
Elimination System (NPDES) permit. Detailed BMPs are not included in this manual since site
requirements for these facilities are well beyond the level of typical BMP applications. See Chapter 5
of this volume for reference information.
Contact the City of Auburn Sanitary Sewer Utility at 253-931-3010 for their requirements. An
Industrial Wastewater Discharge Permit is required before discharging contact stormwater or process
wastewater to the municipal sewer system. The Department of Ecology regulates the treatment,
storage and disposal of Dangerous Wastes.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 529
4.5.7 BMP A407: Storage of Liquid, Food Waste or Dangerous Waste
Containers
4.5.7.1 Description of Pollutant Sources
Steel and plastic drums with volumetric capacities of 55 gallons or less are typically used at industrial
facilities for storage of liquids and powders. The BMPs specified below apply to container(s) located
outside a building used for temporary storage of accumulated food wastes, vegetable or animal
grease, used oil, liquid feedstock cleaning chemicals, or Dangerous Wastes (liquid or solid), unless
the business is permitted by Ecology to store the wastes. Leaks and spills of pollutant materials
during handling and storage are the primary sources of pollutants. Oil and grease, acid/alkali pH,
BOD, and metals are potential pollutant constituents.
4.5.7.2 Pollutant Control Approach
Store containers in impervious containment under a roof or other appropriate cover, or in a building.
For roll-containers (for example, dumpsters) that are picked up directly by the collection truck, a filet
can be placed on both sides of the curb to facilitate moving the dumpster. If a storage area is to be
used on-site for less than 30 days, a portable temporary secondary system like that shown in Figure
IV-4-13 can be used in lieu of a permanent system as described above.
4.5.7.3 Required BMPs
• Place tight-fitting lids on all containers. Provide adequate freeboard/headspace.
• Place drip pans beneath all mounted container taps and at all potential drip and spill
locations during filling and unloading of containers.
• Inspect container storage areas regularly for corrosion, structural failure, spills, leaks,
overfills, and failure of piping systems. Check containers daily for leaks/spills. Replace
containers, secure lids, and replace and tighten bungs in drums, as needed.
• Drums stored in an area where unauthorized persons may gain access must be
secured in a manner that prevents accidental spillage, pilferage, or any unauthorized
use (see Figure IV-4-14).
• If the material is a Dangerous Waste, the business owner must comply with any
additional Ecology requirements as specified in Chapter 5.
• Storage of reactive, ignitable, or flammable liquids must comply with the Uniform Fire
Code.
• Cover dumpsters or keep them under cover, such as a lean-to, to prevent the entry of
stormwater. Replace or repair leaking garbage dumpsters.
• Drain dumpsters and/or dumpster pads to sanitary sewer. Keep dumpster lids closed.
Install waterproof liners.
• Keep containers with Dangerous Waste, food waste or other potential pollutant liquids
inside a building unless this is impracticable due to site constraints or Uniform Fire
Code requirements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 530
• Store containers in a designated area that is covered, bermed, or diked; paved; and
impervious in order to contain leaks and spills (see Figure IV-4-15). The secondary
containment shall be sloped to drain into a dead-end sump for the collection of leaks
and small spills.
• For liquid wastes, surround the containers with a dike as illustrated in Figure IV-4-15.
The dike must be of sufficient height to provide a volume of 10 percent of the total
enclosed container volume or 110 percent of the volume contained in the largest
container, whichever is greater, or, if a single container, 110 percent of the volume of
that container.
• Where material is temporarily stored in drums, a containment system can be used,
as illustrated, in lieu of the above system (see Figure IV-4-13).
• Place containers mounted for direct removal of a liquid chemical for use by
employees inside a containment area as described above. Use a drip pan during
liquid transfer (see Figure IV-4-16).
• For contaminated stormwater in the containment area, connect the sump outlet to a
sanitary sewer, if approved by the City of Auburn, or to appropriate treatment such
as an API or CP oil/water separator, catch basin filter, or other appropriate system
(see Volume V). Equip the sump outlet with a normally closed and locked steel line
and valve to prevent the release of spilled or leaked liquids, especially flammables
(in compliance with Fire Codes), and dangerous liquids. This valve may be opened
only for the conveyance of contaminated stormwater to treatment. Maintain a log to
record inspections and when the containment area is drained to treatment.
• Another option for discharge of contaminated stormwater is to provide a dead-end
sump or catchment. Stormwater can then be pumped to a tank truck or other
appropriate vehicle for off-site treatment and/or disposal.
Figure 4.11 – Secondary Containment System
Figure IV-4-13. Secondary Containment Vessel
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 531
Figure 4.12 – Locking System for Drum Lid
Figure IV-4-14. Locking System for Drum Lid
Figure IV-4-15. Covered and Bermed Containment Area
Figure IV-4-16. Mounted Container
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 532
4.5.8 BMP A408: Storage of Liquids in Above-Ground Tanks
4.5.8.1 Description of Pollutant Sources
Above-ground tanks containing liquids (excluding uncontaminated water) may be equipped with a
valved drain, vent, pump, and bottom hose connection. These tanks may be heated with steam heat
exchangers equipped with steam traps. Leaks and spills can occur at connections and during liquid
transfer. Oil and grease, organics, acids, alkalis, and heavy metals in tank water and condensate
drainage can also cause stormwater contamination at storage tanks.
4.5.8.2 Pollutant Control Approach
Install secondary containment or a double-walled tank. Slope the containment area to a drain with a
sump. Stormwater collected in the containment area may need to be discharged to treatment such as
an API or CP oil/water separator, or equivalent BMP. Add safeguards against accidental releases
including protective guards around tanks to protect against vehicle or forklift damage, and tag valves
to reduce human error. Tank water and condensate discharges are process wastewater that may
need an NPDES Permit or approval to discharge to the sanitary system.
4.5.8.3 Required BMPs for All Tanks
• Inspect the tank containment areas regularly to identify leaks/spills, cracks,
corrosion, etc. in problem components such as fittings, pipe connections, and valves.
• Develop a spill plan as per the requirements of BMP A714: Spills of Oil and
Hazardous Substances.
• Place adequately sized drip pans beneath all mounted taps and drip/spill locations
during filling/unloading of tanks. Valved drain tubing may be needed in mounted drip
pans.
• Sweep and clean the tank storage area regularly, if paved.
• Replace or repair tanks or other components that are leaking, corroded, or otherwise
deteriorating.
• All installations shall comply with the International Fire Code and the National
Electric Code.
• Locate permanent tanks in impervious (Portland cement concrete or equivalent)
secondary containment surrounded by dikes as illustrated in Figure IV-4-17, or use
UL approved double-walled tanks.
• Double-walled tanks with exposure to traffic must be protected with bollards, jersey
barriers, or walls. Bollards should be at least 4 feet high, at least 3 feet from the tank,
and no more than 4 feet apart.
• Include a tank overfill protection system to minimize the risk of spillage during
loading.
• There must be at least 5 feet of space between the tanks and any enclosures.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 533
4.5.8.4 Required BMPs for Single-walled Tanks
• The containment volume shall be 100% of the volume of the largest tank plus the
volume of stormwater from rain events up to a 25-year, 24-hour storm within the
containment area or 110% of the volume of the largest tank, whichever is greater.
• There must be at least 5 feet of space between the tanks and any enclosures.
• Slope the secondary containment to drain to a dead-end sump (optional), or
equivalent, for the collection of small spills.
• If the tank containment area is uncovered, equip the outlet from the spill-containment
sump with a shutoff valve, which is normally closed and locked. Valves for
flammables containment shall be made of steel. Valves for corrosives containment
shall be compatible with the material being stored.
• The external valve may be opened manually only to convey contaminated
stormwater to an approved treatment or disposal facility, or to convey
uncontaminated stormwater to a storm drain. Evidence of contamination can include
the presence of visible sheen, color, or turbidity in the runoff, or existing or historical
operational problems at the facility. Simple pH measurements with litmus or pH
paper can be used for areas subject to acid or alkaline contamination.
• At petroleum tank farms, convey stormwater contaminated with floating oil or debris
in the contained area through an API or CP-type oil/water separator (Volume V,
Treatment BMPs) or other approved treatment facility prior to discharge to storm
drain or surface water. Direct discharges require an NPDES permit from the
Department of Ecology.
• Loading racks and transfer areas associated with tank farms shall provide spill
containment and treatment sized to encompass the largest vessel (trailer, railcar,
intermodal tank) using the area.
4.5.8.5 Recommended BMPs for Double-walled Tanks
• Tank pads and the fuel delivery area should be protected from stormwater run-on but sized
and sloped to capture any leaks or spills from the tank or fueling process.
• Feed and return lines from the tanks shall be doubled walled or entirely contained within the
utility corridor.
• Catch basins receiving drainage from the tank pad and fueling area should be oversized and
have down-turned elbows in their outlets or flow to an appropriately sized oil/water separator.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 534
Figure IV-4-17. Above-Ground Tank Storage
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 535
4.5.9 BMP A409: Parking and Storage for Vehicles and Equipment
4.5.9.1 Description of Pollutant Sources
Parked vehicles at public and commercial parking lots and garages, such as retail store, fleet vehicle
(including rent-a-car lots and car dealerships), equipment sale and rental parking lots, and parking lot
driveways, can be sources of toxic hydrocarbons and other organic compounds, oils and greases,
metals, and suspended solids.
4.5.9.2 Required BMPs
• If washing of a parking lot is conducted, discharge the wash water to a sanitary
sewer (if allowed by the City of Auburn) or other approved wastewater treatment
system, or collect it for off-site disposal.
• Do not hose down the area to a storm drain or receiving water. Sweep (vacuum
sweeping is preferred) parking lots, storage areas, and driveways regularly to collect
dirt, waste, and debris.
• An oil removal system such as an API or CP oil and water separator, catch basin
filter, or equivalent BMP (see VV), approved by the City of Auburn, is applicable for
parking lots meeting the threshold vehicle traffic intensity level of a high-use site. For
more information on high-use sites, refer to Volume V, Chapter 1.
• Covered floors of parking garages must drain to the sanitary sewer through an
approved oil/water separator. Uncovered floors must be routed to the storm drainage
system through an approved treatment device.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 536
4.6 Construction and Demolition Activities
4.6.1 BMP A501: Clearing, Grading and Preparation of Construction Sites
This activity applies to businesses and municipal agencies that develop lands for construction. It also
applies to residences that undertake large yard clearing and grading projects. Stormwater runoff from
bare ground can be loaded with dirt and other pollutants. This material can clog ditches and stream
channels, thus reducing carrying capacity and increasing flooding, as well as smothering spawning
beds for fish. Simply controlling runoff and not allowing it to leave the site will prevent these harmful
effects. Clearing, grading, and preparation activities are covered in detail in Volume II of this manual,
Construction Stormwater Pollution Prevention. Grading activities are also regulated in the City of
Auburn by the Grading and Excavation Code, Chapter 15.74 ACC.
Control of stormwater run-on and soil stabilization is critical. Limiting the area to be cleared and
graded during wet weather seasons will make site stabilization and sediment control easier.
Coverage under Ecology’s Construction Stormwater General Permit is required for construction sites
that result in the disturbance of one acre or more of land. Compliance with the Construction
Stormwater Pollution Prevention requirements in Ecology’s manual is required, as applicable.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 537
4.6.2 BMP A502: Demolition of Buildings
4.6.2.1 Description of Pollutant Sources
This activity applies to removal of existing buildings by controlled explosions, wrecking balls, or
manual methods, and subsequent clearing of the rubble. The loose debris can contaminate
stormwater. Pollutants of concern include toxic organic compounds, heavy metals, asbestos, and
suspended solids.
4.6.2.2 Pollutant Control Approach
Regularly clean up debris that can contaminate stormwater. Protect the storm drainage system from
dirty runoff and loose particles. Sweep paved surfaces daily. Vacuum sweeping is preferred.
4.6.2.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses and public agencies
engaged in building demolition:
• Identify and properly abandon all utility connections such as sanitary sewer, gas, fuel
lines and tanks.
• If directed to keep water out of the storm system during demolition activity, storm
drain covers or a similarly effective containment device must be placed on all nearby
drains to prevent dirty runoff and loose particles from entering the storm drainage
system. If storm drains are not present, dikes, berms, or other methods must be
used to protect overland discharge paths from runoff. See BMP S102 and S107 for
more information on runoff control and disposal options.
• Utilize storm drain inlet protection per BMP C220.
• Street gutters, sidewalks, driveways, and other paved surfaces in the immediate area
of the demolition must be swept at the end of each work day to collect and properly
dispose of loose debris and garbage.
4.6.2.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• Water should be sprayed throughout the site to help control wind blowing of fine
materials such as soil, concrete dust, and paint chips. The amount of water must be
controlled so that runoff from the site does not occur, yet dust control is achieved.
Oils must never be used for dust control.
• If possible, a wall should be constructed to prevent stray building materials and dust
from escaping the area during demolition.
• Install catch basin filter inserts to treat site runoff. Additional information about catch
basin filter inserts can be found in Volume II, BMP C220.
• Schedule demolition to take place at a dry time of the year.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 538
4.6.3 BMP A503: Building, Repair, Remodeling and Construction
4.6.3.1 Description of Pollutant Sources
This activity refers to activities associated with construction of buildings and other structures,
remodeling of existing buildings and houses, and general exterior building repair work. Washing of
buildings is covered under A103 Washing, Pressure Washing, and Steam Cleaning. Painting of
buildings is covered under A307 Painting, Finishing, and Coating of Vehicles, Boats, Buildings, and
Equipment. Concrete pouring is covered under A302 Concrete Pouring and Asphalt Application at
Temporary Sites.
Pollutants of concern include toxic organics, suspended solids, heavy metals, asbestos, pH, oils, and
greases.
4.6.3.2 Pollutant Control Approach
Employees must be educated about the need to control site activities. Control leaks, spills, and loose
material. Utilize good housekeeping practices.
4.6.3.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses engaged in building
repair, remodeling, and construction:
• Employees must be educated about the need to control site activities to prevent
stormwater pollution, and also must be trained in spill cleanup procedures.
• Spill cleanup materials, appropriate to the chemicals being used on site, must be
available at the work site at all times.
• The work site must be cleaned up at the end of each work day, with materials such
as solvents put away indoors or covered and secured so that vandals will not have
access to them.
• The area must be swept daily to collect loose litter, paint chips, grit, and dirt.
• Absolutely no substance can be dumped on pavement, the ground, or in or toward
storm drains, regardless of its content, unless it is only uncontaminated water.
• Bermed ground or drop cloths must be used underneath scraping and sandblasting
work. Ground cloths, buckets, or tubs must also be used anywhere that work
materials are laid down.
• Tools covered with non-water-based finishes or other materials must be cleaned in a
manner that enables collection of used solvents for recycling or proper disposal. See
BMP S102 for disposal options.
• Inlet protection as described in Volume II, BMP C220 must be used if dust, grit, wash
water, or other pollutants may escape the work area. This is particularly necessary
on rainy days. Provide inlet protection over the storm drain at the beginning of the
work day. Do not perform outdoor work during wet weather if contaminants could be
washed off-site by rainfall.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 539
4.6.3.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• Recycle materials whenever possible.
• Light spraying of water on the work site can control some of the dust and grit that can
blow away. Oils must never be used for dust control. Never spray to the point of
runoff from the site.
• Activities such as tool cleaning should occur over a ground cloth or within a
containment device such as a tub.
• Catch basin filter inserts may be considered.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 540
4.7 Dust Control, and Soil and Sediment Control
4.7.1 BMP A601: Dust Control at Disturbed Land Areas and Unpaved
Roadways and Parking Lots
4.7.1.1 Description of Pollutant Sources
Dust can cause air and water pollution problems particularly at demolition sites, disturbed land areas,
and unpaved roadways and parking lots.
4.7.1.2 Pollutant Control Approach
Minimize dust generation and apply environmentally friendly and government approved dust
suppressant chemicals, if necessary.
4.7.1.3 Required BMPs
• Sprinkle or wet down soil or dust with water as long as it does not result in runoff or a
wastewater discharge. Minimize the amount of water to avoid washing pollutants into
the storm drainage system. At active construction sites, street sweeping shall be
performed prior to washing the street.
• Use only local and/or state government approved dust suppressant chemicals such
as those listed in Ecology Publication #96-433, “Techniques for Dust Prevention and
Suppression.” See BMP C126, Polyacrylamide for Soil Erosion Protection, in
Volume II, Chapter 3 of this manual.
• Avoid excessive and repeated applications of dust suppressant chemicals. Time the
application of dust suppressants to avoid or minimize their wash-off by rainfall or
human activity such as irrigation.
• Use stormwater containment to prevent the conveyance of solids by stormwater into
storm drains or receiving waters.
• The use of motor oil or other oils for dust control is prohibited. Care shall be taken
when using lignin derivatives and other high BOD chemicals in excavations or areas
easily accessible to surface water or groundwater.
• Consult with the Ecology Northwest Regional Office at 425-649-7000 on discharge
permit requirements if the dust suppression process results in a wastewater
discharge to the ground, groundwater, storm drain, or surface water.
4.7.1.4 Recommended BMPs for Roadways and Other Trafficked Areas:
• Consider limiting use of off-road recreational vehicles on dust generating land.
• Consider paving unpaved permanent roads, approaches, exits, access lanes, and
other trafficked areas at municipal, commercial, and industrial areas.
• Consider paving or stabilizing shoulders of paved roads with gravel, vegetation, or
City of Auburn approved chemicals.
• Encourage use of alternate paved routes, if available.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 541
• Vacuum or wet sweep fine dirt and skid control materials from paved roads soon
after winter weather ends or as needed.
• Consider using traction sand that is pre-washed to reduce dust emissions.
4.7.1.5 Recommended BMPs for Dust Generating Areas:
• Prepare a dust control plan. Helpful references include: Control of Open Fugitive
Dust Sources (EPA-450/3-88-088) and Fugitive Dust Background Document and
Technical Information Document for Best Available Control Measures
(EPA-450/2-92-004).
• Limit exposure of soil (dust source) as much as feasible.
• Stabilize dust-generating soil by growing and maintaining vegetation, mulching,
topsoiling, and/or applying stone, sand, or gravel.
• Apply windbreaks in the soil such as trees, board fences, tarp curtains, bales of hay,
etc.
• Cover dust-generating piles with wind-impervious fabric, or equivalent material.
Additional information on dust control can be found in Volume II of this manual.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 542
4.7.2 BMP A602: Dust Control at Manufacturing Sites
4.7.2.1 Description of Pollutant Sources
Industrial material handling activities can generate considerable amounts of dust that is typically
removed using exhaust systems. This can generate air emissions that can contaminate stormwater.
Dusts can be generated at cement and concrete product mixing facilities, foundries, and wherever
powdered materials are handled. Particulate materials that are of concern to air pollution control
agencies include grain dust, sawdust, coal, gravel, crushed rock, cement, and boiler fly ash. The
objective of this BMP is to reduce the stormwater pollutants caused by dust generation and control.
4.7.2.2 Pollutant Control Approach
Prevent dust generation and emissions where feasible, regularly clean-up dust that can contaminate
stormwater, and convey dust contaminated stormwater to proper treatment.
4.7.2.3 Required BMPs
• Clean building roofs, powder material handling equipment, and vehicles that can be
sources of stormwater pollutants as needed to remove accumulated dust and residue.
• Regularly sweep dust accumulation areas that can contaminate stormwater.
Sweeping shall be conducted using vacuum filter equipment to minimize dust
generation and to ensure optimal dust removal.
• Minimize the amount of water used for dust control to avoid washing pollutants into
the storm drainage system.
4.7.2.4 Recommended BMPs
• In manufacturing operations, train employees to handle powders carefully to prevent
generation of dust.
• Use dust filtration/collection systems such as bag house filters, cyclone separators,
etc. to control vented dust emissions that could contaminate stormwater. It may be
necessary to monitor rooftops for possible accumulations of materials and take
appropriate measures to prevent this material from entering the storm drainage
system. Control of dust at foundries, metal shredders, and material transfer and
handling facilities are some examples.
• Use water spray to flush dust accumulations to sanitary sewers where allowed by the
City of Auburn or to other appropriate treatment system.
• Use approved dust suppressants such as those listed in Ecology Publication
“Techniques for Dust Prevention and Suppression,” #96-433. (Ecology, 2003).
Application of some products may not be appropriate in close proximity to receiving
waters or conveyances close to receiving waters. For more information check with
the Ecology Northwest Regional Office or the City of Auburn.
• For removal of TSS in stormwater, use sedimentation basins, wet ponds, wet vaults,
catch basin filters, vegetated filter strips, or equivalent sediment removal BMPs.
Refer to Volume V for more information about these BMPs.
• Additional information on dust control can be found in Volume II of this manual.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 543
4.7.3 BMP A603: Soil Erosion and Sediment Control at Industrial Sites
4.7.3.1 Description of Pollutant Sources
Industrial activities on soil areas, exposed and disturbed soils, steep grades, etc. can be sources of
sediments that can contaminate stormwater runoff.
4.7.3.2 Pollutant Control Approach
Limit the exposure of erodible soil, stabilize or cover erodible soil where necessary to prevent
erosion, and/or provide treatment for stormwater contaminated with TSS caused by eroded soil.
4.7.3.3 Required BMPs
Apply one or more of the following cover practices:
• Vegetative cover such as grass, trees, large bark, bonded fiber matrix, or shrubs on
erodible soil areas;
• Covering with mats such as clear plastic, jute, synthetic fiber; or gunite; and/or
• Preservation of natural vegetation including grass, trees, shrubs, and vines.
Control sediment through installing a vegetated swale, dike, silt fence, check dam, gravel filter berm,
and/or sedimentation basin and properly grading. For design information refer to Volume II.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 544
4.8 Other Activities
4.8.1 BMP A701: Commercial Animal Handling Areas
4.8.1.1 Description of Pollutant Sources
Racetracks, kennels, fenced pens, veterinarians, and businesses that provide boarding services for
horses, dogs, cats, etc. can generate pollutants from activities such as manure deposits, animal
washing, grazing, and any other animal handling activity that could contaminate stormwater.
Pollutants can include coliform bacteria, nutrients, and total suspended solids.
4.8.1.2 Pollutant Control Approach
To prevent, to the maximum extent practicable, the discharge of contaminated stormwater from
animal handling and keeping areas.
4.8.1.3 Required BMPs
• Regularly scoop, sweep and clean animal keeping areas to collect and properly
dispose of droppings, uneaten food, and other potential stormwater contaminants.
• Do not hose down to storm drains or receiving waters those areas that contain
potential stormwater contaminants.
• Contaminated water must go to the sanitary sewer. A hair and sediment trap may be
required.
• Do not allow any wash water to be discharged to storm drains or to receiving water
without proper treatment.
• If animals are kept in unpaved and uncovered areas, the ground must either have
vegetative cover or some other type of ground cover, such as mulch.
• If animals are not leashed or in cages, the area where animals are kept must be
surrounded by a fence or other devices to prevent animals from moving away from
the controlled area where BMPs are used.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 545
4.8.2 BMP A702: Log Sorting and Handling
4.8.2.1 Description of Pollutant Sources
Log yards are paved or unpaved areas where logs are transferred, sorted, debarked, cut, and stored
to prepare them for shipment or for the production of dimensional lumber, plywood, chips, poles, or
other products. Log yards are generally maintained at sawmills, shipping ports, and pulp mills.
Typical pollutants include oil and grease, BOD, settleable solids, total suspended solids (including
soil), high and low pH, heavy metals, pesticides, wood-based debris, and leachate.
The following are pollutant sources:
• Log storage, rollout, sorting, scaling, and cutting areas
• Log and liquid loading areas
• Log sprinkling
• Debarking, bark bin, and conveyor areas
• Bark, ash, sawdust and wood debris piles, and other solid wastes
• Metal salvage areas
• Truck, rail, ship, stacker, and loader access areas
• Log trucks, stackers, loaders, forklifts, and other heavy equipment
• Maintenance shops and parking areas
• Cleaning areas for vehicles, parts, and equipment
• Storage and handling areas for hydraulic oils, lubricants, fuels, paints, liquid wastes,
and other liquid materials
• Pesticide usage for log preservation and surface protection
• Application of herbicides for weed control
• Contaminated soil resulting from leaks or spills of fluids
4.8.2.2 Ecology’s Baseline General Permit Requirements
Industries with log yards are required to obtain coverage under the baseline General Permit for
Discharges of Stormwater Associated with Industrial Activities to Surface Water. The permit requires
preparation and on-site retention of Stormwater Pollution Prevention Plans (SWPPP). The SWPPP
must identify operational, source control, erosion and sediment control, and, if necessary, treatment
BMPs. Required and recommended operational, source control, and treatment BMPs are presented
in detail in Ecology’s Guidance Document: Industrial Stormwater General Permit Implementation
Manual for Log Yards, Publication # 04-10-031. It is recommended that all log yard facilities obtain a
copy of this document.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 546
4.8.3 BMP A703: Boat Building, Maintenance and Repair
4.8.3.1 Description of Pollutant Sources
Sources of pollutants at boat and ship building, repair, and maintenance facilities include pressure
washing, surface preparation, paint removal, sanding, painting, engine maintenance and repairs, and
material handling and storage, if conducted outdoors. Potential pollutants include spent abrasive
grits, solvents, oils, ethylene glycol, wash water, paint over-spray, cleaners/detergents, anti-corrosive
compounds, paint chips, scrap metal, welding rods, resins, glass fibers, dust, and miscellaneous
trash. Pollutant constituents include TSS, oil and grease, organics, copper, lead, tin, and zinc.
Related activities are covered under the following activity headings in this manual, and other BMPs
provided in this manual:
• A103 Washing, Pressure Washing, and Steam Cleaning of
Vehicles/Equipment/Building Structures
• A202 Fueling at Dedicated Stations
• A714 Spills of Oil and Hazardous Substances
4.8.3.2 Pollutant Control Approach
Apply good housekeeping, preventive maintenance, and cover and containment BMPs in and around
work areas.
4.8.3.3 Required BMPs
The following BMPs or equivalent measures are required of all businesses, public agencies, and
private boat owners engaged in boat building, mooring, maintenance and repair that are not covered
by the NPDES permit for boatyards:
• Maintenance and repair activities that can be moved on-shore must be moved
accordingly. This action reduces some of the potential for direct pollution impact on
waterbodies.
• Blasting and spray painting activities must be sheltered by hanging tarps to block the
wind and prevent dust and overspray from escaping. Move the activity indoors if
possible. See Chapter 5 for details on Puget Sound Clean Air Agency limitations.
• Bermed ground cloths must be used for collection of drips and spills in painting and
finishing operations, and paint chips and used blasting sand from sand blasting.
• Collect spent abrasives regularly and store under cover to await proper disposal.
• Dispose of greasy rags, oil filters, air filters, batteries, spent coolant, and degreasers
properly.
• Drain oil filters before disposal or recycling.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 547
• Bilge water must be collected for proper disposal rather than discharged on land or
water. See BMP S102 for detail on disposal options. Discharge of contaminated bilge
water may be avoided if oil-absorbent pads are used to capture the oil in the bilge
water before or during pumping. If pads are used, they must be recycled or properly
disposed.
• Convey sanitary sewage to pump-out stations, portable on-site pump-outs or other
appropriate onshore facilities.
• Maintenance yard areas must be swept and cleaned, without hosing down the area,
at least once per week or as needed. This prevents sandblasting materials,
scrapings, paint chips, oils, and other loose debris from being carried away with
stormwater. The collected materials must be disposed of properly. See BMP S102
for disposal options.
• Docks and boat ramps must be swept at least once per week or as needed and the
collected materials must be disposed of properly.
• Paint and solvent mixing, fuel mixing and similar handling of liquids shall be
performed on shore, or such that no spillage can occur directly into surface
waterbodies.
• Routine cleanup materials such as oil-absorbent pads, brooms, dustpans, mops,
buckets, and sponges must be stocked near docks.
• Comply with BMP A203 and A101 if engine repair and maintenance are conducted.
• In the event of an accidental discharge of oil or hazardous material into waters of the
state or onto land with a potential for entry into state waters, immediately notify the
Department of Ecology, and the National Response Center at 1-800-424-8802
(24 hour).
4.8.3.4 Recommended BMPs
The following BMPs are not required but can provide additional pollution protection:
• Boat construction and structural repair activities should be covered.
• Materials such as paints, tools, and ground cloths should be stored indoors or in a
covered area when not in use.
• Select the least toxic anti-fouling paint available.
• Use sanders that have dust containment bags and avoid sanding in windy
conditions.
• All used oil should be recycled if feasible. To dispose of filters, let drain 24 hours,
then double wrap in plastic and dispose in the regular garbage. Pending state
legislation may make disposal in the garbage illegal, so call the Hazardous Waste
Line at 1-800-287-6429 for current information.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 548
• Use one of the following treatment BMPs when paint chips or blasting grit are
prevalent in the work area
o Catch basin filter insert
o Infiltration basin
o Wet pond or vault
o Constructed wetland
o Vegetated biofilter
o Filtration with media designed for the pollutants that are present
o Equivalent BMP (see Volume V)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 549
4.8.4 BMP A704: Logging
4.8.4.1 Description of Pollutant Sources
This activity covers logging activities that fall under the Washington State Forest Practices Act
category of Class IV general forest practices. These are situations where timber harvesting is done in
the process of converting forest lands into other land uses, such as home and business construction.
Stormwater runoff from bare ground can be loaded with dirt and other pollutants. This material can
clog ditches and stream channels, thus reducing carrying capacity and increasing flooding, as well as
smothering spawning beds for fish. Simply controlling runoff and not allowing it to leave the site will
prevent these harmful effects. Clearing and grading activities are covered in detail in Volume II of this
manual, Construction Stormwater Pollution Prevention. Grading activities are also regulated in the
City of Auburn by the Land Clearing, Filling and Grading Code, Chapter 15.74 ACC.
Control of stormwater run-on and soil stabilization is critical. Limiting the area to be cleared and
graded during wet weather seasons will make site stabilization and sediment control easier.
Coverage under Ecology’s Construction Stormwater General Permit is required for construction sites
that result in the disturbance of one acre or more of land. Compliance with the Construction
Stormwater Pollution Prevention requirements in Ecology’s manual is required, as applicable.
Virtually all logging operations will require a permit from the Washington State Department of Natural
Resources. Sensitive/critical areas and wetlands ordinances for Auburn also contain requirements for
logging activities in the vicinity of water bodies.
Pollutants of concern include suspended solids, oils and greases, biochemical oxygen demand
(BOD), nutrients, toxic organic compounds, and heavy metals.
4.8.4.2 Pollutant Control Approach
Maintain required buffers adjacent to critical areas, including streams and wetlands. Keep sediments
out of waterbodies and off paved areas.
4.8.4.3 Required BMPs
• Vegetation along stream corridors, and adjacent to other waterbodies and wetlands,
must be preserved. Maintenance of a vegetated buffer enables filtration of most of
the pollutants of concern for this activity. The above-mentioned ordinances contain
specific requirements for buffer setbacks.
• Logging access roads must have a crushed rock or spall apron construction entrance
where they join the pavement to prevent sediments from being tracked onto the
pavement.
• On-site fueling and maintenance operations must follow the required BMPs as
outlined in A204 Mobile Fueling; A203 Vehicle Maintenance; and A407 Storage of
Liquid, Food Waste, or Dangerous Waste Containers.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 550
4.8.4.4 Recommended BMPs
The following BMPs are not required, but can provide additional pollution protection:
• Erosion potential can be reduced by avoiding logging on steep slopes.
• If access roads are constructed for logging, they should be provided with drainage
ditches that divert runoff into vegetated areas or stormwater treatment systems.
• Plant vegetated buffers in areas where they are already downslope of proposed
logging areas, with sufficient lead time to allow for effective growth.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 551
4.8.5 BMP A705: Mining and Quarrying of Sand, Gravel, Rock, Peat, Clay and
Other Materials
4.8.5.1 Description of Pollutant Sources
This activity applies to surface excavation and on-site storage of sand, gravel, and other materials
that are mined. All mining operations that have stormwater runoff from the site are required to apply
for a National Pollutant Discharge Elimination System (NPDES) permit with the Department of
Ecology. Ecology has specific BMPs required by the permit. Some additional BMPs to help meet
Ecology’s discharge performance standards are listed below. Other permits from the Washington
Department of Natural Resources and the City of Auburn may be required.
Pollutants of concern are suspended solids, nutrients, pH, oils, and metals.
Pollutant Control Approach: Provide containment and or cover for any on-site storage areas to
prevent run-on and discharge of suspended solids and other pollutants.
4.8.5.2 Recommended BMPs
• If the material is appropriate, use excavated spoil material to form compacted berms
along downslope sides of the site to contain runoff. Berms should be seeded to
promote growth of grass or other vegetation to limit erosion from the berms. Safety
measures to prevent flooding due to berm failure shall be considered.
• Measures to control track-out and dust should be implemented. Wheel washes,
sweeping, and paving high traffic areas are some common practices.
• Semi-permanent stockpiles should be seeded to promote vegetation growth which
can help to limit erosion from the stockpiles.
• Use sediment ponds to promote settling of suspended solids. Refer to Volume V of
this manual for more information.
• Use anchored tarps to cover stockpiles at small-scale mining operations if there is a
potential for contaminated stormwater to leave the site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 552
4.8.6 BMP A706: Swimming Pool and Spa Cleaning and Maintenance
4.8.6.1 Description of Pollutant Sources
This activity applies to all municipal and commercial swimming pools and spas. Pools and spas at
hotels, motels, and apartment and condominium complexes are covered here. Pools at single-family
residences are covered in Chapter 3 of this volume. Commercial pool and spa cleaning services
must follow the required BMPs for all pools serviced.
Pollutants of concern include nutrients, suspended solids, chlorine, pH, and chemical oxygen
demand (COD).
4.8.6.2 Pollutant Control Approach
Dispose of pool or spa water to the sanitary sewer.
4.8.6.3 Required BMPs
• The preferred method of pool or spa water disposal is to the sanitary sewer. If a
sanitary sewer is available, all Health Department regulated facilities are required to
connect for draining and backwash. Contact the City of Auburn Sanitary Sewer Utility
at 253-931-3010 prior to discharge for instructions on allowable flow rates and timing
before starting to drain the pool. Never discharge pool water to a septic system, as it
may cause the system to fail.
• If discharge to the sanitary sewer is not possible, pool and spa water may be
discharged to a ditch or storm drainage system, provided that the water has been
dechlorinated first. The proponent is required to contact the City of Auburn Storm
Drainage Utility at 253-931-3010 prior to discharge for instructions on allowable flow
rates for the system or ditch that is being discharged to. All discharges shall be de-
chlorinated to a concentration of 0.1 parts per million (ppm or mg/L) or less, and pH
adjusted 6.5 to 8.5 standard units, if necessary. Neutralizing chemicals are available
for dechlorinating water and adjusting the pH. Turbidity shall not exceed 10 NTU.
Letting the pool or spa "sit" may also reduce chlorine levels. Use a test kit to
determine if the chlorine concentration has reached zero and the pH is within
acceptable limits.
• State law allows discharges of pool water to the ground, not to a water body or storm
drainage system, with a chlorine level of up to 3 parts per million. However, the water
must not cross property lines or impact neighboring properties, and a satisfactory
means for distributing the water to the ground must be used so there is no runoff.
• Backwash from pool filters cannot be discharged to surface waters, storm drainage
systems, septic systems, or on the ground.
• Diatomaceous earth used in pool filters cannot be discharged to surface waters,
storm drainage systems, septic systems, or on the ground.
4.8.6.4 Recommended BMP
• Hire a professional pool-draining service to collect all pool water for offsite disposal.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 553
4.8.7 BMP A707: De-Icing and Anti-Icing Operations for Streets & Highways
4.8.7.1 Description of Pollutant Sources
Deicing and/or anti-icing compounds are used on highways, streets, and sidewalks to control ice and
snow. Typically ethylene glycol and propylene glycol are deicers used on aircraft. Deicers commonly
used on highways, streets and sidewalks include calcium magnesium acetate (CMA), calcium
chloride, magnesium chloride, sodium chloride, urea, and potassium acetate. The deicing and anti-
icing compounds become pollutants when they are conveyed to storm drains or to surface water after
application. Leaks and spills of these chemicals can also occur during their handling and storage.
4.8.7.2 Required BMPs
• Select de-icers and anti-icers that cause the least adverse environmental impact.
Apply only as needed using minimum quantities.
• Where feasible and practicable, use roadway deicers, such as calcium magnesium
acetate, potassium acetate, or similar materials that cause less adverse
environmental impact than urea and sodium chloride.
• Store and transfer de/anti-icing materials on an impervious containment pad in
accordance with BMP A401 Storage or Transfer (Outside) of Solid Raw Materials,
By-Products, or Finished Products and A408 Storage of Liquids in Above-Ground
Tanks.
• Sweep/clean up accumulated de/anti-icing materials and grit from roads as soon as
possible after the road surface clears.
4.8.7.3 Recommended BMPs
• Intensify roadway cleaning in early spring to help remove particulates from road
surfaces.
• Include limits on toxic metals in the specifications for de/anti-icers.
• Additional guidance can be found in the Regional Road Maintenance - Endangered
Species Act (ESA) program guidelines.
• State guidelines contain additional information for de-icing activities at airports.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 554
4.8.8 BMP A708: Roof and Building Drains at Manufacturing and Commercial
Buildings
4.8.8.1 Description of Pollutant Sources
Stormwater runoff from roofs and sides of manufacturing and commercial buildings can be sources of
pollutants caused by leaching of roofing materials, building vents, and other air emission sources.
Vapors and entrained liquid and solid droplets/particles have been identified as potential pollutants in
roof/building runoff. Metals, solvents, acidic/alkaline pH, BOD, and organics are some of the pollutant
constituents identified.
4.8.8.2 Pollutant Control Approach
Evaluate the potential sources of stormwater pollutants and apply source control BMPs where
feasible. Use dust filtration/collection systems such as bag house filters, cyclone separators, etc. to
control vented dust emissions that could contaminate stormwater. It may be necessary to monitor
roof tops for possible accumulations of materials and take appropriate measures to prevent this
material from entering the storm drainage system. Control of dusts at foundries, metal shredders, and
material transfer and handling facilities are some examples.
4.8.8.3 Required BMPs
• Bare galvanized metal shall not be used for materials that convey stormwater, such
as roofs, canopies, siding, gutters, downspouts, roof drains, and pipes. Any
galvanized materials shall have an inert, non-leachable finish, such as baked
enamel, fluorocarbon paint (such as Kynar or Hylar ), factory-applied epoxy, pure
aluminum, or asphalt coating. Acrylic paint, polyester paint, field-applied, and part
zinc (such as Galvalume ) coatings are not acceptable.
• If leachates and/or emissions from buildings are suspected sources of stormwater
pollutants, then sample and analyze the stormwater draining from the building.
• If a roof/building stormwater pollutant source is identified, implement appropriate
source control measures such as air pollution control equipment, selection of
materials, operational changes, material recycle, process changes, etc.
• Water quality treatment BMPs are found in Volume V of this manual.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 555
4.8.9 BMP A709: Urban Streets
4.8.9.1 Description of Pollutant Sources
Streets can be sources of vegetative debris, paper, fine dust, vehicle liquids, tire wear residues,
heavy metals (lead and zinc), phthalates, soil particles, ice control salts, domestic wastes, animal
wastes, lawn chemicals, and vehicle combustion by-products. Street surface contaminants have
been found to contain significant concentrations of particle sizes less than 250 microns (Sartor and
Boyd, 1972).
4.8.9.2 Pollutant Control Approach
Conduct efficient street sweeping where and when appropriate to minimize the contamination of
stormwater. Do not wash street debris into storm drains.
4.8.9.3 Recommended BMPs
• For maximum stormwater pollutant reductions on curbed streets and high volume
parking lots, use efficient vacuum sweepers.
• High-efficiency street sweepers utilize strong vacuums and the mechanical action of
main and gutter brooms combined with an air filtration system that only returns clean
air to the atmosphere (i.e., filters very fine particulates). They sweep dry and use no
water since they do not emit any dust.
• For moderate stormwater pollutant reductions on curbed streets, use regenerative air
sweepers or tandem sweeping operations.
• A tandem sweeping operation involves a single pass of a mechanical sweeper
followed immediately by a single pass of a vacuum sweeper or regenerative air
sweeper.
o A regenerative air sweeper blows air down on the pavement to entrain
particles and uses a return vacuum to transport the material to the hopper.
o These operations usually use water to control dust. This reduces their ability
to pick up fine particulates.
• For minimal stormwater pollutant reductions on curbed streets, use mechanical
sweepers.
NOTE: Mechanical sweepers are referred to as broom sweepers and use the mechanical
action of main and gutter brooms to throw material on a conveyor belt that transports it to the
hopper. These sweepers usually use water to control dust, reducing their ability to pick up
fine particulates.
• Conduct sweeping at optimal frequencies. Optimal frequencies are those scheduled
sweeping intervals that produce the most cost-effective annual reduction of
pollutants normally found in stormwater and can vary depending on land use, traffic
volume, and rainfall patterns.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 556
• Train operators in those factors that result in optimal pollutant removal. These factors
include sweeper speed, brush adjustment and rotation rate, sweeping pattern,
maneuvering around parked vehicles, and interim storage and disposal methods.
• Minimize the amount of water applied for dust control to avoid washing pollutants into
the storm drainage system.
• At active construction sites, street sweeping shall be performed prior to washing the
street.
• Consider the use of periodic parking restrictions and public notification in residential
areas to ensure the sweeper’s ability to sweep along the curb.
• Establish procedures for prompt sweeping, removal, and disposal of spill clean-up
materials and debris from special events that will generate higher than normal
loadings.
• Disposal of street sweeping solids must comply with “Recommendations for
Management of Street Wastes” described in Appendix D of this volume. Additional
guidance can be found in the Regional Road Maintenance – Endangered Species
Act (ESA) program guidelines.
• Inform citizens about the importance of eliminating yard debris, oil, and other wastes
in street gutters in order to reduce street pollutant sources.
• When encountering questionable sweeping waste contact the City of Auburn Storm
Drainage Maintenance and Operations at 253-931-3048.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 557
4.8.10 BMP A710: Railroad Yards
4.8.10.1 Description of Pollutant Sources
Pollutant sources can include drips/leaks of vehicle fluids and cargo onto the railroad bed; human
waste disposal; litter; locomotive/railcar/equipment cleaning; fueling; outside material storage; the
erosion and loss of soil particles from the railroad bed; maintenance and repair activities at railroad
terminals, switching yards, and maintenance yards; and herbicides used for vegetation management.
Waste materials can include waste oil, solvents, degreasers, antifreeze solutions, radiator flush,
acids, brake fluids, dust, soiled rags, oil filters, sulfuric acid and battery sludge, machine chips with
residual machining oil, and toxic fluids/solids lost during transit. Potential pollutants include oil and
grease, TSS, BOD, organics, pesticides, and metals.
4.8.10.2 Pollutant Control Approach
Apply good housekeeping and preventive maintenance practices to control leaks and spills of liquids
in railroad yard areas.
4.8.10.3 Required BMPs
• Implement the applicable BMPs in this chapter depending on the pollutant generating
activities/sources at a railroad yard facility.
• Do not allow toilets to discharge to outside areas while a train is in transit or at the
station. Pump-out facilities shall be used to service train toilets.
• Use drip and track pans at hose/pipe connections during liquid transfer and other
leak-prone areas.
• During maintenance do not discard debris or waste liquids along the tracks or in
railroad yards.
• Promptly clean up all spilled materials.
In areas subjected to leaks/spills of oils or other chemicals, convey the contaminated stormwater to
appropriate treatment such as a sanitary sewer (if approved by the City of Auburn), to a CP or API
oil/water separator for floating oils, or other appropriate treatment BMP (as approved by the City of
Auburn). See Volume V.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 558
4.8.11 BMP A711: Maintenance of Public and Utility Corridors and Facilities
4.8.11.1 Description of Pollutant Sources
Passageways and equipment at petroleum product, natural gas, and water pipelines and electrical
power transmission corridors and rights-of-way can be sources of pollutants, such as herbicides used
for vegetation management and eroded soil particles from unpaved access roads. At pump stations,
waste materials generated during maintenance activities may be temporarily stored outside.
Additional potential pollutant sources include the leaching of preservatives from wood utility poles,
PCBs in older transformers, water that is removed from underground transformer vaults, and
leaks/spills from petroleum pipelines. The following are potential pollutants: oil and grease, TSS,
BOD, organics, PCB, pesticides, and heavy metals.
4.8.11.2 Pollutant Control Approach
Control fertilizer and pesticide applications, soil erosion, and site debris that can contaminate
stormwater.
4.8.11.3 Required BMPs
• Implement BMPs included in Chapter 4, BMP A306: Landscaping and
Lawn/Vegetation Management.
• When water or sediments are removed from electric transformer vaults, determine
whether contaminants might be present before disposing of the water and
sediments. This includes inspecting for the presence of oil or sheen, and determining
from records or testing if the transformers contain PCBs. If records or tests indicate
that the sediment or water are contaminated above applicable levels, manage these
media in accordance with applicable federal and state regulations, including the
federal PCB rules (40 CFR 761) and the state MTCA cleanup regulations (Chapter
173-340 WAC). Water removed from the vaults can be discharged in accordance
with the federal 40 CFR 761.79, and state regulations (Chapter 173-201A WAC and
Chapter 173-200 WAC), or via the sanitary sewer if the requirements, including
applicable permits, for such a discharge are met. (See also Chapter 5).
• Within utility corridors, consider preparing maintenance procedures and an
implementation schedule that provides for vegetative, gravel, or equivalent cover that
minimizes bare or thinly vegetated ground surfaces within the corridor to prevent the
erosion of soil. Pave high traffic corridors.
• Provide maintenance practices to prevent stormwater from accumulating and
draining across and/or onto roadways. Stormwater shall be conveyed through
roadside ditches and culverts. The road shall be crowned, out-sloped, water barred,
or otherwise left in a condition not conducive to erosion. Appropriately maintaining
grassy roadside ditches discharging to surface waters is an effective way of
removing some pollutants associated with sediments carried by stormwater.
• Maintain ditches and culverts at an appropriate frequency to ensure that plugging
and flooding across the roadbed, with resulting overflow erosion, does not occur.
• Apply the appropriate BMPs from Volume IV for the storage of waste materials that
can contaminate stormwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 559
4.8.11.4 Recommended BMPs
• When selecting utility poles for a specific location, consideration should be given to
the potential environmental effects of the pole or poles during storage, handling, and
end-use, as well as its cost, safety, efficacy, and expected life. If a wood product
treated with chemical preservatives is used, it should be made in accordance with
generally accepted industry standards such as the American Wood Preservers
Association Standards. If the pole or poles will be placed in or near an
environmentally sensitive area, such as a wetland or a drinking water well,
alternative materials or technologies should be considered. These include poles
constructed with material(s) other than wood, such as fiberglass composites, metal,
or concrete. Other technologies and materials, such as sleeves or caissons for wood
poles, may also be considered when they are determined to be practicable and
available.
• Ring the base of treated poles with adsorbent material if leaching of preservative
may occur. Monitor the adsorbents as needed.
• As soon as practicable, remove all litter from wire cutting/replacing operations, etc.
• Implement temporary erosion and sediment control in areas where clear-cuts are
conducted and new roads are constructed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 560
4.8.12 BMP A712: Maintenance of Roadside Ditches
4.8.12.1 Description of Pollutant Sources
Common road debris including litter, eroded soil, oils, vegetative particles, and heavy metals can be
sources of stormwater pollutants.
4.8.12.2 Pollutant Control Approach
Roadside ditches should be maintained to preserve the condition and capacity for which they were
originally constructed, and to minimize bare or thinly vegetated ground surfaces. Maintenance
practices should provide for erosion and sediment control (Refer to BMP A306 Landscaping and
Lawn/Vegetation Management).
4.8.12.3 Required BMPs
• Inspect roadside ditches regularly, as needed, to identify sediment accumulations
and localized erosion.
• Clean ditches on a regular basis, as needed. Ditches shall be kept free of rubbish
and debris.
• Vegetation in ditches often prevents erosion and cleanses runoff waters. Remove
vegetation only when flow is blocked or excess sediments have accumulated.
Conduct ditch maintenance (seeding, fertilizer application, harvesting) in late spring
and/or early fall, where possible. Consider leaving segments of undisturbed
vegetation to provide natural filtration.
• In the area between the edge of the pavement and the bottom of the ditch,
commonly known as the “bare earth zone,” use grass vegetation, wherever possible.
Vegetation shall be established from the edge of the pavement if possible or at least
from the top of the slope of the ditch.
• Diversion ditches on top of cut slopes that are constructed to prevent slope erosion
by intercepting surface drainage must be maintained to retain their diversion shape
and capability.
• Ditch cleanings are not to be left on the roadway surfaces. Sweep dirt and debris
remaining on the pavement at the completion of ditch cleaning operations.
• Roadside ditch cleanings not contaminated by spills or other releases and not
associated with a stormwater treatment system such as a bioswale may be screened
to remove litter and separated into soil and vegetative matter (leaves, grass,
needles, branches, etc.). The soil fraction may be handled as ‘clean soils’ and the
vegetative matter can be composted or disposed of in a municipal waste landfill. For
more information, please see “Recommendations for Management of Street
Wastes,” in Appendix D of this volume.
• Roadside ditch cleanings contaminated by spills or other releases known or
suspected to contain dangerous waste must be handled following the Dangerous
Waste Regulations (Chapter 173-303 WAC) unless testing determines it is not
dangerous waste. Specific cleanup standards are set forth in the Model Toxics
Control Act (Chapter 70.105D RCW) and Regulations (Chapter 173-340 WAC).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 561
• Inspect culverts on a regular basis for scour or sedimentation at the inlet and outlet,
and repair as necessary. Give priority to those culverts conveying perennial and/or
salmon-bearing streams and culverts near streams in areas of high sediment load,
such as those near subdivisions during construction.
4.8.12.4 Recommended BMPs
• Install biofiltration swales and filter strips to treat roadside runoff wherever
practicable and use engineered topsoils wherever necessary to maintain adequate
vegetation. These systems can improve infiltration and stormwater pollutant control
upstream of roadside ditches. Refer to Volume V of this manual for additional
information about biofiltration swales and filter strips.
• Additional guidance can be found in the Regional Road Maintenance - Endangered
Species Act (ESA) program guidelines.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 562
4.8.13 BMP A713: Maintenance of Stormwater Drainage and
Treatment Facilities
4.8.13.1 Description of Pollutant Sources
Facilities include roadside catch basins on arterials and within residential areas, conveyance
systems, detention facilities such as ponds and vaults, oil and water separators, biofilters, settling
basins, infiltration systems, and all other types of stormwater treatment systems presented in
Volume V. Roadside catch basins can remove from 5 to 15 percent of the pollutants present in
stormwater. When catch basins are about 60 percent full of sediment, they cease removing
sediments. Oil and grease, hydrocarbons, debris, heavy metals, sediments, and contaminated water
are found in catch basins, oil and water separators, settling basins, etc.
4.8.13.2 Pollutant Control Approach
Provide maintenance and cleaning of debris, sediments, and oil from stormwater collection,
conveyance, and treatment systems to obtain proper operation.
4.8.13.3 Required BMPs
Maintain stormwater treatment facilities according to the O&M procedures presented in
Volume I, Appendix D, in addition to the following BMPs:
• Inspect and clean treatment BMPs, conveyance systems, and catch basins as
needed, and determine whether improvements in O&M are needed.
• Promptly repair any deterioration threatening the structural integrity of the facilities.
These include replacement of clean-out gates, catch basin lids, and rock in
emergency spillways.
• Ensure that storm sewer capacities are not exceeded and that heavy sediment
discharges to the sewer system are prevented.
• Regularly remove debris and solids from BMPs used for peak-rate control, treatment,
etc. and discharge to a sanitary sewer if approved by the City of Auburn, or truck to a
local or state government approved disposal site.
• Clean catch basins in accordance with the information provided in Volume I,
Appendix D. Additional information is also included in BMP S109: Cleaning Catch
Basins.
• Clean debris in a catch basin as frequently as needed to ensure proper operation of
the catch basin.
• Post warning signs or curb markers; “Dump No Waste - Drains to Groundwater,”
“Streams,” “Lakes,” or emboss on or adjacent to all storm drain inlets where
practical.
• Disposal of sediments and liquids from the catch basins must comply with
“Recommendations for Management of Street Wastes” described in Appendix D of
this volume.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 563
• Select additional applicable BMPs from Chapter 4 of this volume depending on the
pollutant sources and activities conducted at the facility. Those BMPs include:
o A407 Storage of Liquid, Food Waste, or Dangerous Waste Containers.
o A603 Soil Erosion and Sediment Control at Industrial Sites
o A709 Urban Streets
o A714 Spills of Oil and Hazardous Substances
o S101 Eliminate Illicit Storm Drainage System Connections
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 564
4.8.14 BMP A714: Spills of Oil and Hazardous Substances
4.8.14.1 Description of Pollutant Sources
Owners or operators of facilities engaged in drilling, producing, handling, gathering, storing,
processing, transferring, distributing, refining or consuming oil and/or oil products are required by
Federal Law to have a Spill Prevention and Control Plan. The federal definition of oil is oil of any kind
or any form, including, but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with
wastes other than dredged spoil. Specific regulations can be found in 40 CFR Part 112, as amended
December, 2006. These regulations are administered by the Environmental Protection Agency and
the United States Coast Guard. Large petroleum handling facilities and vessels are also subject to
regulations contained in Chapter 90.56 RCW and Chapter 173-180A WAC.
Owners of businesses that produce Dangerous Wastes are also required by State Law, Chapter
70.105 RCW and Chapter 173-303 WAC, to have a spill control plan. These businesses should refer
to Chapter 5 of this volume. The City of Auburn may also require a spill plan to protect the municipal
sewer system and groundwater resources. Plans required by the above listed regulations may
suffice.
4.8.14.2 Pollutant Control Approach
Maintain, update, and implement an oil spill prevention/cleanup plan.
4.8.14.3 Required BMPs
• Prepare an Emergency Spill Control Plan (SCP), which includes:
o A description of the facility including the owner's name and address.
o The nature of the activity at the facility.
o The general types of chemicals used or stored at the facility.
o A site plan showing the location of storage areas for chemicals, the locations
of storm and sanitary drains, the areas draining to them, the ultimate point of
discharge, and the location and description of any devices to stop spills from
leaving the site such as positive control valves;
o Cleanup procedures and supplies.
o Notification procedures to be used in the event of a spill, such as notifying
key personnel. Agencies such as Ecology, Valley Regional Fire Authority,
Washington State Patrol, City of Auburn, and the U.S. Environmental
Protection Agency shall be notified.
o The name and 24-hour contact telephone number of the designated person,
and their alternate with overall spill cleanup and notification responsibility.
o Identify contractors that can be contacted to provide spill clean-up and
disposal services. A service agreement is encouraged.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 565
• Train key personnel in the implementation of the Emergency SCP. Prepare a
summary of the plan and post it at appropriate points in the building, identifying the
spill cleanup coordinators, location of cleanup kits, and 24-hour phone numbers of
regulatory agencies to be contacted in the event of a spill.
• Update the SCP regularly.
• Immediately notify Ecology and the City of Auburn if a spill may reach sanitary or
storm sewers, groundwater, or surface water, in accordance with federal and
Ecology spill reporting requirements.
• Immediately clean up spills using appropriate personal protection equipment and
following the facility safety standards. Do not use emulsifiers for cleanup unless an
appropriate disposal method for the resulting oily wastewater is implemented.
Absorbent material shall not be washed down a floor drain or storm sewer.
• Locate emergency spill containment and cleanup kit(s) in high potential spill areas.
The contents of the kit shall be appropriate for the type and quantities of chemical
liquids stored at the facility.
4.8.14.4 Recommended BMPs
• Spill kits should include appropriately lined drums, absorbent pads, and granular or
powdered materials for neutralizing acids or alkaline liquids where applicable. In
fueling areas: absorbent should be packaged in small bags for easy use and small
drums should be available for storage of absorbent and/or used absorbent. Spill kits
should be deployed in a manner that allows rapid access and use by employees.
• Example spill plans may be obtained from the Washington State Department of
Transportation and the Environmental Protection Agency.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 566
4.8.15 BMP A715: Water Reservoir, Transmission Mainline, Wellhead, and
Hydrant Flushing Activities
4.8.15.1 Description of Pollutant Sources
Construction and operation of drinking water infrastructure, as well as emergency response activities,
can generate sediments, rust, turbidity and suspended solids, bacteria, and chlorinated water.
Flushing of the water delivery system is necessary to maintain drinking water quality and ensure
public health. Flushing activities can result in increased flows in downstream conveyances. These
high flows may cause flooding and create erosion in downstream channels.
4.8.15.2 Pollutant Control Approach
Establish operational controls for flow rate and volume of discharges, removal of sediments,
neutralization of chlorine, and maximizing the beneficial use of the resource.
4.8.15.3 Required BMPs
• Discharges of untreated hyperchlorinate water must go to the sanitary sewer. Prior
City approval is required.
• Alternatively, non-emergency discharges of de-chlorinated potable water may go to
the storm drainage system at prior approved flow rates provided the following limits
are met:
o Chlorine residual 0.1 ppm
o pH 6.5 – 8.5
• Evaluation of the receiving conveyance system for capacity and/or obstructions may
be required.
• City approval may be required for draining and flushing reservoirs, standpipes,
wellheads, and transmission lines. Notification, monitoring, reporting, flow control
measures, and other special conditions may apply. Contact the City of Auburn Public
Works Department at 253-931-3010 for the requirements.
• For routine hydrant and water main flushing, coordinate with the City of Auburn
Storm Maintenance and Operations section at 253-931-3048. In all cases, the
receiving storm pipe shall be monitored for the duration of the discharge to maintain
half the full-pipe flow rate.
4.8.15.4 Recommended BMPs
• During emergency repairs and activities, such as mainline breaks, erosion control
measures shall be taken as practicable. Use of sandbags, check dams, plastic
sheeting, pumps, and other erosion control measures should be employed to
minimize erosion as much as possible.
• Excavation de-watering should be managed to minimize downstream environmental
impacts. Use of vactor trucks, diverting flow to grassy areas, filter bags, and retention
ponds should be employed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 567
• Significant releases of water can have a detrimental effect on the storm and sanitary
transmission system as well as receiving waters. Notification of these releases must
be promptly made to the City by calling 253-931-3048.
Figure IV-4-18. Hydrant Flushing
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 568
4.8.16 BMP S101: Eliminate Illicit Storm Drainage System Connections
A common problem found in storm drainage systems is illegal hook-ups to the system. Conversely,
discharging clean, uncontaminated water to the sanitary sewer system is also prohibited.
All businesses and residences in Auburn shall examine their plumbing systems to determine if illicit
connections exist. Any time it is found that toilets, sinks, appliances, showers and bathtubs, floor
drains, industrial process waters, cooling towers, or other indoor activities are connected to the storm
drainage system, the connections must be immediately rerouted to the sanitary or septic system,
holding tanks, or process treatment system. Exceptions to this requirement would be those industries
and businesses that have been issued an NPDES Permit by Ecology, and are allowed specific
discharges under that permit. Please refer to Chapter 5 to determine if a specific type of business is
required to have a NPDES permit.
Dye testing with a non-toxic dye, smoke testing, electronic locators, and television inspection
equipment can help to determine where a pipe or structure drains if it is not obvious by observations
or on plans. Contact the City of Auburn Public Works Department at 253-931-3010 for assistance in
locating City structures adjacent to a property.
Drains which are found to be connected to the wrong system must either be permanently plugged or
disconnected and rerouted as soon as possible. Permits must be obtained from The City of Auburn
(253-931-3090) to reroute drains. If the discharge is contaminated and sanitary service is not
available, alternate measures will be necessary. If the discharge is simply domestic waste, a septic
system may be feasible. Contact the appropriate County Health Department for a septic system
permit. If the discharge is anything other than domestic, then a holding tank or on-site treatment may
be necessary. Contact the City of Auburn Storm Drainage Utility at 253-931-3010 for assistance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 569
4.8.17 BMP S102: Dispose of Contaminated Stormwater and Waste Materials
Properly
Every business and residence in Auburn must dispose of solid and liquid wastes and contaminated
stormwater properly. There are generally four options for disposal depending on the type of materials.
These options include:
• Sanitary sewer and septic systems
• Recycling facilities
• Municipal or private, permitted solid waste disposal facilities
• Permitted hazardous waste treatment, storage, and disposal facilities
Many liquid wastes and contaminated stormwater (depending on the pollutants and associated
concentrations present) can be put into the sanitary sewer. Animal wastes can also be disposed of in
a sanitary sewer. A permit may be required for discharges to the sanitary sewer system. Please
contact the Auburn Utilities Section at 253-931-3010 for design and permit requirements.
If wastes cannot be legally discharged to a sanitary sewer or septic system, one of the other three
disposal options must be used. Recycling facilities are a recommended option for many commercial
and household items, including used oils, used batteries, old equipment, glass, some plastics, metal
scrap materials, solvents, paints, wood and land clearing wastes, and various other solid wastes.
Solid wastes that cannot be recycled and that are not hazardous must be disposed of at a licensed
municipal solid waste disposal facility. Dangerous and hazardous wastes must be properly
transported to an appropriate hazardous waste treatment, storage, and disposal facility. The City of
Auburn Solid Waste Utility at 253-931-3047 can provide information on waste disposal options.
Maintain records for all materials that are recycled or disposed.
Appendix A of this volume has a list of telephone numbers to contact for assistance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 570
4.8.18 BMP S103: Discharge Process Wastewater to a Sanitary Sewer,
Holding Tank, or Water Treatment System
This BMP is a minimum requirement for all industrial and commercial activities that generate
contaminated process wastewater, such as washing activities, composting activities, and production
and processing activities. The water used in these activities shall not drain to surface waters or
groundwater untreated. Process water must drain to a sanitary sewer, holding tank, on-site treatment
system, wastewater treatment system, or be recycled.
In order to connect to the sanitary sewer, contact Auburn Permit Center at 253-931-3090 for
information on sanitary sewer connection permits. Call the City of Auburn Sanitary Sewer Utility at
253-931-3010 for pretreatment and permit information.
If a sanitary sewer is not available, the only remaining options are holding tanks or an on-site
wastewater treatment facility.
The contents of the holding tank must be pumped out or drained before the tank is full and disposed
of properly (see BMP S102).
If the on-site wastewater treatment facility option is taken, then it must be designed to receive and
effectively treat all discharges of process water from the business. The Washington State
Department of Ecology must be contacted for approval of such a facility.
If the activity is to remain uncovered, then define a designated area for the activity and provide a
mechanism for prevention of stormwater run-on into the activity area. (e.g. a curb, dike, or berm).The
designated area shall be paved and sloped to a central collection drain and be connected to the
sanitary sewer, (with pretreatment if required), the on-site holding tank, or the on-site treatment
facility, whichever method is selected.
Monitoring and maintaining all collection systems and keeping records of inspections and
maintenance may be required.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 571
4.8.19 BMP S108: Implement Integrated Pest Management Measures
Use of herbicides, fungicides, and rodenticides should always be done with extreme caution, not only
because of the potential harm to humans and pets, but also because of the potential harm to fish,
wildlife, and our water resources. In light of the toxic nature of these compounds, special attention
should be given to pesticide usage in all applications. The discussion below applies more to large-
scale licensed pesticide users, but should be considered for backyard applications as well.
Commercial, agricultural, municipal, and other large scale pesticide users, such as golf courses and
parks, should adhere to the principles of integrated pest management (IPM), a decision-making
process for pest management that strives for intelligent, environmentally sound control of pests. It is a
systems approach to pest management that combines agronomic, biological, chemical, and genetic
information for educated decisions on the type of control to use, the timing and extent of chemical
application, and whether non-chemical means can attain an acceptable level of pest control.
IPM is a preventive measure aimed at knowing the exact pests being targeted for control, the
locations and times when pests will pose problems, the level of pest-induced damage that can be
tolerated without taking action, the most vulnerable life stage, and control actions that are least
damaging to the environment. The major components of IPM are as follows:
• Monitoring and inventory of pest populations
• Determination of pest-induced injury and action levels
• Identification of priority pest problems
• Selection and timing of least toxic management tools
• Site-specific treatment with minimized chemical use
• Evaluation and adjustment of pesticide applications
Monitoring of pest populations is a key to successful IPM implementation. Pest problems are
universally easier to control if the problem can be discovered early. With IPM, pesticides are used
only as a last resort. Maximization of natural controls, including biological controls and removal of
pests by hand, is always the first choice.
Additional concerns are storage, equipment clean-up, spill protocols, and waste disposal.
More information on IPM is available from the Washington State Department of Agriculture and from
the Washington State University Extension Service, or in Appendix C of this volume.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 572
4.8.20 BMP S109: Cleaning Catch Basins
Cleaning catch basins regularly is one of the most important stormwater source control measures
that a business can take. Catch basins are typically located at low spots in parking lots, along curbs
and road edges, and where storm drain pipes combine flows. Catch basins collect surface runoff for
storm drains that are typically located directly underneath them. Most catch basins have some
storage in the bottom that never drains to an outflow pipe. This permanent storage area is intended to
trap sediments, debris, and other particles that can settle out of stormwater, thus preventing clogging
of downstream pipes and washing of these solids into receiving waters. All of the solids and stagnant
water collected from catch basin sumps must be disposed of properly. The sump contents shall not
be flushed into the catch basin outflow pipe.
For additional information on the maintenance of catch basins, refer to Volume I, Appendix D.
Perform regular inspections of the basins and their grates. Remove trash and collected sediment
when 60% of the sump depth has been filled or sediments are within 6 inches of the bottom of the
outlet pipe.
It should be apparent that the use of other BMPs, such as frequent sweeping of activity areas,
covering activity areas, reducing activity occurrence, and containing run-off from activity areas will
help reduce catch basin cleaning frequency, thus saving time and money. All businesses and
agencies should set up maintenance schedules for all of their BMPs so coordinated BMP
maintenance efforts results in reduced catch basin cleaning frequencies.
Use of catch basin inserts such as filter socks, absorbent pillows, and filter baskets require an
increased inspection frequency to prevent plugging and flooding.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 573
4.9 Cover and Surround Activities
4.9.1 BMP S104: Cover the Activity with a Roof or Awning
In many cases, a simple roof or awning will protect the activity from coming into contact with
stormwater, and usually at a lower cost than a complete building. These structures require building
permits to construct. Contact the City of Auburn Permit Center at 253-931-3090 to obtain permits.
The area of the roof cover shall be sufficient to prevent any precipitation from reaching the covered
materials. Provisions shall be made to prevent stormwater run-on into the covered area. The
installation of sumps or sanitary sewer drains may also be necessary. Roof drains shall discharge
outside and be directed away from the covered area. Examples of these types of structures are
shown in
Figure IV-4-19.
Figure IV-4-19. Examples of Covered Activities
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 574
4.9.2 BMP S105: Cover the Activity with an Anchored Tarp or Plastic Sheet
Some activities, such as stockpiling of raw materials, can be effectively covered with a sturdy tarp or
heavy plastic sheet made of impermeable material. Weights such as bricks, tires, or sandbags
should be used to anchor the cover in place. Run-on shall be prevented from reaching the activity or
material. Stormwater run-off from the cover shall be directed away from the stockpile and work zone,
and if uncontaminated, directed to the stormwater collection system. The tarp must be inspected
daily to ensure that no holes or gaps are present in the tarp coverage. An example of this type of
cover is shown in Figure IV-4-20.
Figure IV-4-20. Tarp Covering
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 575
4.9.3 BMP S106: Pave the Activity Area and Slope to a Sump, Holding Tank,
or Oil/Water Separator
This BMP applies to several activities that cannot be covered effectively. It is particularly suited to
activities with the potential for leaks and spills, but that otherwise do not generate excessive amounts
of polluted runoff. The activity area shall be paved and sloped to a central collection point. A sump,
holding tank, or oil/water separator (Figure IV-4-21) serves to provide spill containment until the
liquids can be pumped out and properly disposed. The minimum volume for the sump shall be
equivalent to the volume generated by the anticipated activity plus rain water. Sizing justification shall
be included in design submittals.
To prevent run-on, the area should be enclosed with a berm, curb, or dike as shown in Figure IV-4-
23. Frequent inspections of the sump, holding tank, or oil/water separator are necessary. Inspections
and maintenance shall be recorded in a log. Commercial services that pump sumps and holding
tanks are listed in the Yellow Pages of the phone directory under Environmental and Ecological
Services.
Figure IV-4-21. Paved Area with Sump Drain
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 576
4.9.4 BMP S107: Surround the Activity Area with a Curb, Dike, or Berm or
Elevate the Activity
This set of BMP options can be an effective means for prevention of stormwater run-on to an activity
area. In addition, a curb, berm, or dike can be used for containment of spills in the activity area, or for
containment of contaminated activity runoff. Generally, a containment BMP is most applicable to spill
control situations; that is, sites where runoff is relatively clean, but occasional spills may occur.
If a curb, berm, or dike is used for runoff containment, and other containment sizing regulations (such
as fire codes, Environmental Protection Agency, or Department of Ecology restrictions) do not apply,
the containment volume shall be 100% of the volume of the largest tank plus the volume of
stormwater runoff from rain events up to the 25-year, 24-hour storm within the containment area is
contained or 110% of the volume of the largest tank, whichever is greater.
Impervious containment may consist of membrane lined soil enclosures, containment pallets, plastic
pools, mortar mixing tubs, and water troughs.
Regular inspections of the containment area and proper management of any collected stormwater is
required.
Development of a spill plan may be necessary for storage of liquids. See BMP A714. For permanent
storage facilities see BMP A202, A401, A407, and A408.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 577
Figure IV-4-22. Above-Ground Tank with Impervious Walls and Floor
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 578
Figure IV-4-23. Containment Types
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
BMPs for Commercial and Industrial Activities Volume IV
Chapter 4 579
Figure IV-4-24. Standby Generator
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulations and Requirements Volume IV
Chapter 5 580
Chapter 5 Regulations and Requirements
The information in this chapter is provided to aid in compliance with other Auburn and Washington
State regulations, which may apply to a project, industry, or business in terms of protecting water
quality. A listing of relevant regulations is provided but should be verified because of the continuing
modification of statutes, regulations, and City ordinances. It is the applicant’s responsibility to obtain
the current version of any ordinances, statutes, or regulations that apply to a specific project or
activity. Copies of City ordinances are available at the City Clerk’s office in City Hall located at
25 West Main Street, 253-931-3039.
5.1 City of Auburn Codes and Ordinances
The following summarizes Auburn City Code that applies to surface water and pollution control. The
complete code may be found online at:
http://www.auburnwa.gov/Home.asp
8.08 Solid Waste
12.20 Driveways
13 Water, Sewer and Public Utilities
13.48 Storm Drainage Utility
13.48.330 Off-site Improvements
14 Project Review
15.74 Land Clearing, Filling and Grading
16 Environment
16.08 Shoreline Regulation
16.10 Critical Areas
17 Subdivision
18 Zoning
5.2 State, Federal, and Other Regulations and Requirements
5.2.1 Washington State Department of Ecology Requirements for the Discharge
of Process Wastewaters Directly to Surface Waters
If a public sanitary sewer is not available, process wastewater may be discharged, after suitable
treatment, to a surface water body like a lake or stream, or to a drainage field. If the discharge is to a
surface water body, Ecology must approve the type and design of the treatment system, as well as
the outfall design. If a septic tank and drain field are used for treatment, requirements of the Seattle-
King County Health Department (SKCHD) or the Tacoma-Pierce County Health Department
(TPCHD) will also apply. Contact SKCHD at 206-296-4932 or TPCHD at 253-798-6470 for more
information.
Ecology’s requirements can be found at WAC Chapter 173.240.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulations and Requirements Volume IV
Chapter 5 581
5.2.2 Washington State Department of Ecology Requirements for Dangerous
Waste Generators
The state dangerous waste regulations (WAC Chapter 173-303) cover accumulation, storage,
transportation, treatment, and disposal. Of interest to this manual is the temporary accumulation of
waste until taken from the site to a permitted disposal site. Only portions of those regulations that
apply to temporary storage are summarized here.
Permitted Generators
Businesses that generate 220 pounds or more of waste, either per batch or in the aggregate, over
one month must comply with the storage specifications outlined below:
Small-Quantity Waste Generators
These are businesses that generate less than 220 pounds of dangerous waste per month or per
batch (or 2.2 pounds of extremely hazardous waste). Small-quantity generators still fall under
Ecology regulations to the extent that the materials must be properly stored on site until shipment.
The wastes must be moved from the property whenever the accumulated quantity equals or exceeds
220 pounds or whenever the material has resided on site for 180 days. The waste must be disposed
of at an approved facility. If the business is in compliance with these requirements, they are also
considered solid waste generators, and are regulated by the local health departments. For technical
assistance and site visits, contact the Tacoma-Pierce County Health Department at 253-798-6047 or
the King County Hazardous Waste Management program at 206-296-4692. Regulations governing
small-quantity generators are currently being reviewed to possibly raise the accumulation limit. Call
the Hazardous Waste Line at 800-287-6429 for the most up-to-date information.
Dangerous Waste Pollution Prevention Plans
A recent state law established the requirement that generators of dangerous wastes in excess of
220 lbs/month (2,640 lbs/year) prepare a waste reduction plan, called a pollution prevention plan, not
to be confused with the stormwater pollution prevention plan (see R.4). The required content of the
plan is set forth in Pollution Prevention Planning - Guidance Manual, January 1992,
Publication #91-2, for WAC Chapter 173-307.
5.2.3 Washington State Department of Ecology Stormwater NPDES Permit
Requirements
The Federal National Pollutant Discharge Elimination System (NPDES) program requires industries
or industrial-type activities to obtain permits for stormwater discharge.
Coverage under Ecology’s general permit for Stormwater Discharges Associated with Industrial
Activities is required for each regulated facility. A business must obtain permit coverage if its primary
activity falls under one of the categories listed in the permit or its fact sheet. The permit and fact sheet
may be viewed on Ecology’s website at www.ecy.wa.gov/programs/wq/permits/index.html.
The program requires the preparation of a stormwater pollution prevention plan (SWPPP). A NPDES
permit is required for certain categories of industries and municipalities for discharge to surface
water, or a storm drain that discharges to surface water or to surface water and groundwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Regulations and Requirements Volume IV
Chapter 5 582
5.2.4 Washington State Department of Ecology Requirements for Underground
and Above Ground Storage Tanks
Underground storage tanks (UST) that contain fuel and other petroleum products are regulated by
the Department of Ecology under WAC Chapter 173-360 Underground Storage Tank
Regulations. Above-ground storage tanks (ASTs) may also be regulated. Inquiries about business-
specific requirements and permitting for USTs and ASTs should be directed to the Department of
Ecology, Northwest Regional Office at 425-649-7000.
5.2.5 U.S. Environmental Protection Agency and Ecology Emergency Spill
Cleanup Requirements
USEPA - Spill Prevention Control and Cleanup (SPCC) Plans (40 CFR 112)
This federal regulation requires that owners or operators of facilities engaged in drilling, producing,
gathering, storing, processing, refining, transferring, or consuming oil and oil products are required to
have a spill prevention and control plan (SPCC), provided that the facility is not transportation related;
and, that the aboveground storage of a single container is in excess of 660 gallons, or an aggregate
capacity greater than 1,320 gallons, or a total below ground capacity in excess of 42,000 gallons.
Department of Ecology Dangerous Wastes (WAC 173-303-350)
The regulations state that generators must have a contingency plan that must include:
1. Actions taken in the event of a spill.
2. Descriptions of arrangements with local agencies.
3. Identification of the owner's emergency coordinator.
4. List of emergency equipment.
5. Evaluation plan for business personnel.
See Federal Regulation 40 CFR 112 and WAC 173-303-350 for further information.
5.2.6 Washington State Department of Agriculture Pesticide Regulations
Washington State pesticide laws are administered by the State's Department of Agriculture, under
the Washington Pesticide Control Act (RCW Chapter 15.58), Washington Pesticide Application
Action (RCW Chapter 17.21), and regulations in WAC Chapter 16.228. In Auburn, all pest control
operators and fumigators are required to obtain certification from the appropriate County Health
Department. Contact the Seattle-King County Health Department at 206-205-4394 or Tacoma-Pierce
County Health Department’s Compliance Program at 253-798-6440 for more information.
5.2.7 Puget Sound Clean Air Agency Air Quality Regulations
The Puget Sound region is under the jurisdiction of regional air quality authorities who in turn must
function under Washington State and federal air quality regulations. The Puget Sound Clear Air
Agency (PSCAA) is the regulatory agency for air quality in Auburn.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Quick Reference Phone Numbers Volume IV
Appendix A 583
Appendix A Quick Reference Phone Numbers
City of Auburn
Storm Drainage Utility 253-931-3010
Permit Center 253-931-3090
Valley Regional Fire Authority 253-591-5740
Solid Waste Management Utility 253-931-3038
Household Hazardous Waste 253-931-3038
Recycling Services 253-931-3038
Environmental Protection Agency (EPA) - Region X 800-424-4372
IMEX (Industrial Materials Exchange) 206-296-4899
King County
Wastewater Program (septic) 206-296-4932
Household Hazardous Waste 206-296-4692
Pest Control Operators 206-205-4394
Tacoma-Pierce County Health Department
On-Site Sewage and Underground Storage Tanks 253-798-6470
Hazardous Waste Section 253-798-6047
Solid Waste 253-798-6047
Hazardous Waste Line 800-287-6429
Pest Control Operators and Fumigators 253-798-6470
University of Washington Center for Urban Water Resources 206-543-6272
Washington State Department of Agriculture 360-902-2010
877-301-4555
Washington State Department of Ecology 360-407-6000
Northwest Regional Office 425-649-7000
Dangerous/Hazardous Waste 360-407-6300
NPDES Stormwater or Wastewater Permits 360-407-6400
Spill Reporting 800-424-8802
Recycling 800-732-9253
Groundwater Quality and Protection 360-407-6400
Underground and Above Ground Storage Tanks 360-407-7170
Washington State University/Pierce County Cooperative Extension 253-798-7180
Puget Sound Clean Air Agency 800-552-3565
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recycling/Disposal of Vehicle Fluids Volume IV
and Other Wastes Appendix B 584
Appendix B Recycling/Disposal of Vehicle Fluids and
Other Wastes
The information in this appendix was obtained from Ecology’s Hazardous Waste Program. For a
copy of “Hazardous Waste Services Directory”, Publication #91-12S, Revised December 1994, call
Ecology’s Hazardous Waste and Toxic Reduction Program at 360-407-6721.
RECOMMENDED MANAGEMENT
Antifreeze Store separately for resale. Separate ethylene glycol from propylene glycol for off-site
recycling.
If not recyclable, send to Treatment, Storage, and Disposal Facility (TSDF) for disposal.
Batteries INTACT: Accumulate under cover prior to sale, deliver to recycler or, return to
manufacturer.
BROKEN: Accumulate acid from broken batteries in resistant containers with secondary
containment. Send to TSDF for disposal.
Brake fluid Accumulate in separate, marked, closed container. Do not mix with waste oil. Recycle.
Fuel Store gasoline, and diesel separately for use or resale.
Mixtures of diesel, gasoline, oil, and other fluids may not be recyclable and may require
expensive disposal.
Fuel filters Drain fluids for use as product. With approval of local landfill operator, dispose to dumpster,
if needed.
Oil filters Puncture the filter dome and drain it for 24 hours. Put oil drained from filters into a "USED
OIL ONLY" container. Keep drained filters in a separate container marked "USED OIL
FILTERS ONLY." Locate a scrap metal dealer who will pick up and recycle filters. With
approval of local landfill operator, dispose of drained filters to dumpster.
Paint Accumulate oil-based and water-based paints separately for use or resale.
If not recyclable, send accumulations to TSDF for disposal.
Power steering fluid Same as for used oils
Shop towels/oily rags Use cloth towels that can be laundered and reused. Accumulate used shop towels in a
closed container.
Sign up with an industrial laundry service that can recycle your towels.
Solvents Consider using less hazardous solvents or switching to a spray cabinet that does not use
solvent.
Accumulate solvents separately. Consider purchasing a solvent still and recycling solvent
on site.
Do not mix with used oil. Do not evaporate as a means of disposal.
Transmission oil,
differential and rear end
fluids
Accumulate in your "USED OIL ONLY" container. Arrange for pickup for off-site recycling.
Used oils; including,
crankcase oil,
transmission oil, power
steering fluid and
differential/rear end oil
Keep used oil in a separate container marked "USED OIL ONLY." Do not mix with brake
fluid, or used antifreeze. Do not mix with any other waste if material will be burned for
heating. Arrange for pickup for off-site recycling.
Windshield washer
fluid
Accumulate separately for use or resale. Discharge to on-site sewage disposal, or, if
acceptable by the local sewer authority, discharge to sanitary sewer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Example of an Integrated Pest Volume IV
Management Program (IPM) Appendix C 585
Appendix C Example of an Integrated Pest
Management Program (IPM)
Integrated Pest Management (IPM) is a natural, long-term, ecologically based systems approach to
controlling pest populations. This system uses techniques either to reduce pest populations or
maintain them at levels below those causing economic injury, or to manipulate the populations so
that they are prevented from causing injury. The goals of IPM are to encourage optimal selective
pesticide use (away from prophylactic, broad spectrum use), and to maximize natural controls to
minimize the environmental side effects.
A step-by-step comprehensive Integrated Pest Management (IPM) Program is provided below as a
guide.
Introduction
This section provides a sound cultural approach to managing lawns and landscapes and minimizing
runoff. Many homeowners or property managers will be able to implement most or all of this
approach. Others will wish to hire these services out. For the do-it yourselfer, an array of resources
are available to assist in the effort. Landscaping businesses, agricultural extensions, local agencies,
master gardener programs, local nurseries, and the library can all provide assistance. Landscaping
professionals (businesses) are particularly encouraged to practice IPM.
Definition
“Integrated pest management, or IPM, is an approach to pest control that uses regular monitoring to
determine if and when treatments are needed, and employs physical, mechanical, cultural, and
biological tactics to keep pest numbers low enough to prevent intolerable damage or annoyance.
Least-toxic chemical controls are used as a last resort.”
True IPM is a powerful approach that anticipates and prevents most problems through proper cultural
practices and careful observation. Knowledge of the life cycles of the host plants and both beneficial
and pest organisms is also important. The IPM section of this example is adapted from “Least Toxic
Pest Management for Lawns” by Sheila Daar. Following the IPM process yields the information
needed to minimize damage by weeds, diseases, and pests and to treat those problems with the
least toxic approaches.
The IPM Process
Step 1. Correctly identify problem pests and understand their life cycle.
Learn more about the pest. Observe it and pay attention to any damage that may be occurring. Learn
about the life cycle. Many pests are only a problem during certain seasons, or can only be treated
effectively in certain phases of the life cycle.
Step 2. Establish tolerance thresholds for pests.
Every landscape has a population of some pest insects, weeds, and diseases. This is good because
it supports a population of beneficial species that keep pest numbers in check. Beneficial organisms
may compete with, eat, or parasitize disease or pest organisms. Decide on the level of infestation
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Example of an Integrated Pest Volume IV
Management Program (IPM) Appendix C 586
that must be exceeded before treatment needs to be considered. Pest populations under this
threshold should be monitored but do not need treatment. For instance, European crane flies usually
do not do serious damage to a lawn unless there are between 25 to 40 larvae per square foot
feeding on the turf in February (in normal weather years). Also, most people consider a lawn healthy
and well maintained even with up to 20% weed cover, so treatment, other than continuing good
maintenance practices, is generally unnecessary.
Step 3. Monitor to detect and prevent pest problems.
Regular monitoring is a key practice to anticipate and prevent major pest outbreaks. It begins with a
visual evaluation of the lawn or landscape's condition. Take a few minutes before mowing to walk
around and look for problems. Keep a notebook, record when and where a problem occurs, then
monitor for it at about the same time in future years. Specific monitoring techniques can be used in
the appropriate season for some potential problem pests, such as European crane fly.
Step 4. Modify the maintenance program to promote healthy plants and discourage pests.
A healthy landscape is resistant to most pest problems. Lawn aeration and overseeding along with
proper mowing height, fertilization, and irrigation will help the grass out-compete weeds. Correcting
drainage problems and letting soil dry out between waterings in the summer may reduce the number
of crane-fly larvae that survive.
Step 5. If pests exceed the tolerance thresholds
Use cultural, physical, mechanical, or biological controls first. If those prove insufficient, use the
chemical controls described below that have the least non-target impact. When a pest outbreak
strikes (or monitoring shows one is imminent), implement IPM then consider control options that are
the least toxic, or have the least non-target impact. Here are two examples of an IPM approach:
• Red thread disease is most likely under low nitrogen fertility conditions and most
severe during slow growth conditions. Mow and bag the clippings to remove
diseased blades. Fertilize lightly to help the grass recover, then begin
grasscycling and change to fall fertilization with a slow-release or natural-organic
fertilizer to provide an even supply of nutrients. Chemical fungicides are not
recommended because red thread cannot kill the lawn.
• Crane fly damage is most prevalent on lawns that stay wet in the winter and are
irrigated in the summer. Correct the winter drainage and/or allow the soil to dry
between irrigation cycles; larvae are susceptible to drying out, so these changes
can reduce their numbers. It may also be possible to reduce crane fly larvae
numbers by using a power de-thatcher on a cool, cloudy day when feeding is
occurring close to the surface. Studies are being conducted using beneficial
nematodes that parasitize the crane fly larvae; this type of treatment may
eventually be a reasonable alternative.
Only after trying suitable non-chemical control methods, or determining that the pest outbreak is
causing too much serious damage, should chemical controls be considered. Study to determine what
products are available and choose a product that is the least toxic and has the least non-target
impact. Refer to the Operational BMPs for the use of Pesticides below for guidelines on choosing,
storing, and using lawn and garden chemicals.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Example of an Integrated Pest Volume IV
Management Program (IPM) Appendix C 587
Step 6. Evaluate and record the effectiveness of the control, and modify maintenance
practices to support lawn or landscape recovery and prevent recurrence.
Keep records! Note when, where, and what symptoms occurred, or when monitoring revealed a
potential pest problem. Note what controls were applied and when, and the effectiveness of the
control. Monitor next year for the same problems. Review your landscape maintenance and cultural
practices to see if they can be modified to prevent or reduce the problem.
A comprehensive IPM Program should also include the proper use of pesticides as a last resort, and
vegetation/fertilizer management to eliminate or minimize the contamination of stormwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 588
Appendix D Recommendations for Management
of Street Wastes
Introduction
This appendix is a summary, taken from the June 1999 draft Ecology publication titled
Recommendations for Management of Street Waste (Publication WQ 99-09). The guidance
document addresses waste generated from stormwater maintenance activities such as street
sweeping and the cleaning of catch basins and, to a limited extent, other stormwater conveyance and
treatment facilities. Limited information is available on the characteristics of wastes from
detention/retention ponds, bioswales, and similar stormwater treatment facilities. The
recommendations provided here may be generally applicable to these facilities, with extra diligence
given to waste characterization.
These recommendations do not constitute rules or regulations, but are suggestions for street
waste handling, reuse, and disposal supported by current regulations and the present state of
knowledge of street waste constituents. The recommendations are intended to address the liquid
and solid wastes collected during routine maintenance of stormwater catch basins,
detention/retention ponds and ditches and similar stormwater treatment and conveyance
structures, and street and parking lot sweeping. In addition to these recommendations, end users
and other authorities may have their own requirements for street waste reuse and handling.
"Street Wastes" include liquid and solid wastes collected during maintenance of stormwater catch
basins and detention/retention ponds and ditches and similar stormwater treatment and conveyance
structures, and solid wastes collected during street and parking lot sweeping.
"Street Wastes," as defined here, does not include solids and liquids from street washing using
detergents, cleaning of electrical vaults, vehicle wash sediment traps, restaurant grease traps,
industrial process waste, sanitary sewage, mixed process, or combined sewage/stormwater wastes.
Wastes from oil/water separators at sites that load fuel are not included as street waste. Street waste
also does not include flood debris, land slide debris, and chip seal gravel.
Street waste does not ordinarily classify as dangerous waste. The owner of the stormwater
facility and/or collector of street waste is considered the waste generator and is responsible for
determining whether or not the waste designates as dangerous waste. Sampling to date has shown
that material from routine maintenance of streets and stormwater facilities does not classify as
dangerous waste (See Table IV-D-7). However, it is possible that street waste from spill sites could
classify as dangerous waste. Street waste from areas with exceptionally high average daily traffic
counts may contain contaminants - such as heavy metals, total petroleum hydrocarbons (TPH), and
carcinogenic polycyclic aromatic hydrocarbons (c-PAH) - at levels that limit reuse options.
Street Waste Solids
Street waste is solid waste. While street waste from normal street and highway maintenance is not
dangerous waste, it is solid waste, as defined under The Solid Waste Management Act (Chapter
70.95 RCW) and under Solid Waste Handling Standards (Chapter 173-350 WAC). Under the Solid
Waste Management Act, local health departments have primary jurisdiction over solid waste
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 589
management. Street waste solids may contain contaminants at levels too high to allow unrestricted
reuse. There are currently no specific references in the Solid Waste Handling Standards to facilities
managing street waste solids. These facilities will typically fit under the section dealing with Piles
Used for Storage and Treatment (Section 320 of the regulation). There are no specific references for
reuse and disposal options for street wastes in the Solid Waste Handling Standards, although the
Solid Waste Handling Standards do not apply to clean soils. In the rule, clean soils are defined as
‘soils that do not contain contaminants at concentrations which could degrade the quality of air,
waters of the state, soils, or sediments; or pose a thereat to the health of humans or other living
organisms’ (WAC 173-350-100). Whether or not a soil is a “clean soil” depends primarily upon the
level of contaminants and, to a lesser degree, on the background level of contaminants at a particular
location and the exposure potential to humans or other living organisms. Therefore, both the soil and
potential land application sites must be evaluated to determine if a soil is a clean soil. Local health
departments should be contacted to determine if a street waste meets the definition of “clean soil”
when it will be reused as a soil.
There is no simple regulatory mechanism available to classify street waste solids as "clean" for
uncontrolled reuse or disposal. Local health districts have historically used the Model Toxics Control
Act Cleanup Regulation (MTCA) Method A residential soil cleanup levels to approximate "clean" and
to make decisions on land application proposals. These regulations were amended in February 2001.
The MTCA regulation is not intended to be directly applied to setting contaminant concentration
levels for land application proposals. However, they may provide human health and environmental
threat information and a useful framework for such decisions, when used in conjunction with other
health and environmental considerations. The local health department should be contacted to
determine local requirements for making this determination.
Using the old MTCA regulations, many local health departments have set a criteria of 200 mg/kg
Total Petroleum Hydrocarbons (TPH) for diesel and heavy fuel oils as a threshold level for clean soil.
Using the new MTCA terrestrial ecological evaluation procedures, allowable TPH levels for land
application could range from 200 – 460 mg/kg, depending on site characteristics and intended land
use. Street waste sampling has historically yielded TPH values greater than 200 mg/kg for
hydrocarbons in the diesel and heavy oil range. These values typically reflect interference from
natural organic material and, to a lesser extent, relatively immobile petroleum hydrocarbons. The
mobile hydrocarbons that are of concern for groundwater protection are generally not retained with
street waste solids. Ecology's Manchester Lab has developed an analytical method to reduce the
problem of natural organic material being included in the TPH analysis for diesel and heavier range
hydrocarbons. This new method, called NWTPH-Dx, reduces the background interference
associated with vegetative matter by as much as 85% to 95%. However, even with the new
methodology, TPH test results for street waste may still be biased by the presence of natural
vegetative material and may still exceed 200 mg/kg. Where the laboratory results report no
‘fingerprint’ or chromatographic match to known petroleum hydrocarbons, the soils should not be
considered to be petroleum contaminated soils.
Street waste solids frequently contain levels of carcinogenic PAHs (c-PAH) that make unrestricted
use inappropriate. This is further complicated by analytical interference caused by organic matter that
raises practical quantitation or reporting limits. To reduce the level of interference the use of US EPA
Test Method 8270, incorporating the silica gel cleanup step, is recommended. The calculated c-PAH
value can vary greatly depending upon how non-detect values are handled. The new MTCA Method
A criterion for c-PAH is 0.1 mg/kg (the sum of all seven c-PAH parameters multiplied by the
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 590
appropriate toxicity equivalency factor) for unrestricted land uses. The MTCA criteria for soil cleanup
levels for industrial properties is 2.0 mg/kg. Following this guidance, most sites where street wastes
could be reused as soil will be commercial or industrial sites, or sites where public exposure will be
limited or prevented.
Street waste treatment and storage facilities shall be permitted by the local health department
as applicable. Under the Solid Waste Management Act, local health departments have primary
jurisdiction over solid waste management
Street waste handling facilities are subject to the requirements of the Solid Waste Handling
Standards. The specific requirements will depend upon the manner in which the waste is managed.
Most facilities will probably be permitted under the section dealing with Piles Used for Storage and
Treatment (Section 320 of the regulation)
For most facilities, permit requirements include a plan of operations, sampling, record keeping and
reporting, inspections, and compliance with other state and local requirements. The plan of operation
should include a procedure for characterization of the waste and appropriate reuse and disposal
options, consistent with the recommendations in this document and applicable federal, state, and
local requirements.
A street waste site evaluation (see sample at end of this appendix) is suggested for all street
waste as a method to identify spill sites or locations that are more polluted than normal. The
disposal and reuse options listed below are based on characteristics of routine street waste and are
not appropriate for more polluted wastes. The collector of street waste should evaluate it both for its
potential to be classified as dangerous waste and to not meet end users requirements.
Street waste that is suspected to be dangerous waste should not be collected with other
street waste. Material in catch basins with obvious contamination (unusual color, staining, corrosion,
unusual odors, fumes, and oily sheen) should be left in place or segregated until tested. Testing
should be based on probable contaminants. Street waste that is suspected to be dangerous waste
should be collected and handled by someone experienced in handling dangerous waste. If potential
dangerous waste must be collected because of emergency conditions, or if the waste becomes
suspect after it is collected, it should be handled and stored separately until a determination as to
proper disposal is made. Street waste treatment and storage facilities should have separate "hot
load" storage areas for such waste. Dangerous Waste includes street waste known and suspected
to be dangerous waste. This waste must be handled following the Dangerous Waste Regulations
(Chapter 173-303 WAC) unless testing determines it is not dangerous waste.
Spills should be handled by trained specialists. Public works maintenance crews and private
operators conducting street sweeping or cleaning catch basins should have written policies and
procedures for dealing with spills or suspected spill materials. Emergency Spill Response telephone
numbers should be immediately available as part of these operating policies and procedures.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 591
The end recipient of street waste must be informed of its source and may have additional
requirements for its use or testing that are not listed here. This document is based primarily on
average street waste's chemical constituents and their potential effect on human health and the
environment. There are physical constituents (for example, broken glass or hypodermic needles) or
characteristics (for example, fine grain size) that could also limit reuse options. Additional treatment
such as drying, sorting, or screening may also be required, depending on the needs and
requirements of the end user.
Street waste treatment and storage facilities owned or operated by governmental agencies
should be made available to private waste collectors and other governmental agencies on a
cost recovery basis. Proper street waste collection and disposal reduces the amount of waste
released to the environment. The operators of street waste facilities should restrict the use of their
facilities to certified and/or licensed waste collectors who meet their training and liability requirements.
The use of street waste solids under this guidance should not lead to designation as a
hazardous waste site, requiring cleanup under MTCA. Exceeding MTCA Method A unrestricted
land use cleanup levels in street waste and products made from street waste, does not automatically
make the site where street waste is reused a cleanup site. A site is reportable only if "-a release
poses a threat to human health or the environment-" (Model Toxic Control Act). The reuse options
proposed below are designed to meet the condition of not posing a threat to human health or the
environment.
Testing of street waste solids will generally be required as part of a plan of operation that
includes procedures for characterization of the waste. Testing frequency, numbers of samples,
parameters to be analyzed, and contaminant limit criteria should all be provided as part of an
approved plan of operation. Table IV-D-5 and Table IV-D-6 provide some recommended parameters
and sampling frequencies for piles of street waste solids from routine street maintenance. These are
provided as guidance only and are intended to assist the utility and the local health department in
determining appropriate requirements. Sampling requirements may be modified, over time, based on
accumulated data. When the material is from a street waste facility or an area that has never been
characterized by testing, the test should be conducted on a representative sample before co-mingling
with other material. Testing in these instances would be to demonstrate that the waste does not
designate as dangerous waste and to characterize the waste for reuse. At a minimum, the
parameters in Table IV-D-5 are recommended for these cases. Note that it will generally not be
necessary to conduct Toxic Characteristic Leaching Procedure (TCLP) analyses when the observed
values do not exceed the recommended values in Table IV-D-5. Table IV-D-7 illustrates some
observed relationships between total metals and TCLP metals values.
For further information on testing methods and sampling plans, refer to:
• SW 846 (US EPA, Office of Solid Waste, Test Methods for Evaluating Solid
Wastes, 3rd Edition) and
• Standard Methods for the Examination of Water and Wastewater (American
Public Health Association, et al., 18th Edition, 1992)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 592
For street waste not exceeding the suggested maximum values in Table IV-D-5 the following
street waste solids reuse and disposal options are recommended:
• Street sweepings that consist primarily of leaves, pine needles and branches,
and grass cuttings from mowing grassy swales can be composted. Litter and
other foreign material must be removed prior to composting or the composting
facility must provide for such removal as part of the process. The screened trash
is solid waste and must be disposed of at an appropriate solid waste handling
facility.
• Coarse sand screened from street sweeping after recent road sanding may be
reused for street sanding, provided there is no obvious contamination from spills.
The screened trash is solid waste and must be disposed of at an appropriate
solid waste handling facility.
• Roadside ditch cleanings, not contaminated by a spill or other release and not
associated with a stormwater treatment system such as a bioswale, may be
screened to remove litter and separated into soil and vegetative matter (leaves,
grass, needles, branches, etc.). The soils from these activities are not generally
regulated as solid waste. Ditching material that may be contaminated must be
stored, tested, and handled in the same manner as other street waste solids. It is
the generator’s responsibility to visually inspect and otherwise determine whether
the materials may be contaminated.
• Construction street waste - solids collected from sweeping or in stormwater
treatment systems at active construction sites - may be placed back onto the site
that generated it, or managed by one of the methods listed below, provided that it
has not been contaminated as a result of a spill. For concrete handling at
construction site, refer to BMP C151 in Volume II.
• Screened street waste soils may be used as feedstock materials for topsoil
operations. This option should be reserved for street waste soils with very low
levels of contaminants. Diluting street waste soils with clean soils or composted
material must not be used as a substitute for treatment or disposal. There may
be physical contaminants (for example, glass, metal, nails, etc.) in street waste
that cannot be entirely screened from the waste. Where present, these
contaminants in street waste could preclude its use as feedstock material for
topsoil operations.
• Fill in parks, play fields, golf courses, and other recreational settings where direct
exposure by the public is limited or prevented. One way to prevent or limit direct
exposure is to cover the fill with sod, grass, or other capping material to reduce
the risk of soil being ingested. The level of contaminants in the street waste must
be evaluated to ensure that the soils meet the definition of clean soils when used
in this manner.
• Fill in commercial and industrial areas, including soil or top dressing for use at
industrial sites, roadway medians, airport infields, and similar sites where there is
limited direct human contact with the soil and the soils will be stabilized with
vegetation or other means. The level of contaminants in the street waste must be
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 593
evaluated to ensure that the soils meet the definition of clean soils when used in
this manner.
• Top dressing on roadway slopes, road or parking lot construction material, road
or parking lot subgrade, or other road fill. The level of contaminants in the street
waste must be evaluated to ensure that the soils meet the definition of clean soils
when used in this manner.
• Daily cover or fill in a permitted municipal solid waste landfill, provided the street
waste solids have been dewatered. Street waste solids may be acceptable as
final cover during a landfill closure. The local health department and landfill
operator should be consulted to determine conditions of acceptance.
• Treatment at a permitted contaminated soil treatment facility.
• Recycling through incorporation into a manufactured product, such as Portland
cement, prefab concrete, or asphalt. The facility operator should be consulted to
determine conditions of acceptance.
• Other end uses as approved by the local health department.
• Disposal at an appropriate solid waste handling facility.
For street waste that exceeds the suggested maximum values in Table IV-D-5, the following
street waste solids reuse and disposal options are recommended:
• Treatment at a permitted contaminated soil treatment facility.
• Recycling through incorporation into a manufactured product, such as Portland
cement, prefab concrete, or asphalt. The facility operator should be consulted to
determine conditions of acceptance.
• Other end uses as approved by the local health department.
• Disposal at an appropriate solid waste handling facility.
Street Waste Liquids
Street waste collection should emphasize solids in preference to liquids. Street waste solids
are the principal objective in street waste collection and are substantially easier to store and treat
than liquids.
Street waste liquids require treatment and/or must follow location limitations before their
discharge. Street waste liquids usually contain high amounts of suspended and total solids and
adsorbed metals. Treatment requirements depend on the discharge location.
Discharges to sanitary sewer and storm sewer systems must be approved by the entity
responsible for operation and maintenance of the system. Ecology will not generally require
waste discharge permits for discharge of stormwater decant to sanitary sewers or to stormwater
treatment BMPs constructed and maintained in accordance with Ecology’s Stormwater Management
Manual for Western Washington. (See Volume V for further detail).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 594
The following disposal options are recommended, in order of preference, for catch basin
decant liquid and for water removed from stormwater treatment facilities.
Under the Municipal General Permit, municipalities are required to use this guidance in determining
appropriate means of dealing with street wastes from stormwater maintenance activities. Ecology
Northwest Regional Office water quality staff can help you with treatment standards and permit
requirements for your particular situation.
Discharge of catch basin decant liquids to a municipal sanitary sewer connected to a Public
Owned Treatment Works (POTW) is the preferred disposal option. Discharge to a municipal
sanitary sewer requires the approval of the sewer authority. Street waste liquids discharged to a
POTW may be treated at a combined street waste liquid and solid facility (decant facility) or at
separate liquids only facilities. These liquid only facilities may consist of modified type 2 catch basins
(with a flow restrictor or oil/water separator) or water quality vaults, strategically located through the
sanitary collection system. These should provide 24 hour detention for the expected volumes and
should be constructed and operated to ensure that the decant discharge does not re-suspend
sediments. Sewer authorities should require periodic sampling and decant facility operators should
test their waste effluent on a regular basis, but street waste decant liquid should meet the most
restrictive local limits with 24 hours of undisturbed gravity settling. Overnight settling is more practical
and will likely meet most local pretreatment requirements. (See Table IV-D-10 for typical catch basin
decant values from King County’s decant facility at Renton).
Discharge of stormwater runoff into sanitary sewers requires a Metro-King County Discharge permit
to avoid hydraulic overloads and treatment performance problems.
Stormwater removed from catch basins and stormwater treatment wetvaults may be
discharged into a Basic or Enhanced Stormwater Treatment BMP.
Decant liquid collected from cleaning catch basins and stormwater treatment wetvaults may be
discharged back into the storm sewer system under the following conditions:
• The preferred disposal option of discharge to sanitary sewer is not reasonably
available, and
• The discharge is to a Basic or Enhanced Stormwater Treatment Facility (See
Volume V), and
• The storm sewer system owner/operator has granted approval and has
determined that the treatment facility will accommodate the increased loading.
Pretreatment may be required to protect the treatment BMP.
Reasonable availability will be determined by the stormwater utility and by the circumstances
including such factors as distance, time of travel, load restrictions, and capacity of the stormwater
treatment facility. Auburn may choose not to allow discharge back to the storm sewer system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 595
Discharging back into the storm sewer is an acceptable option, under certain conditions:
• Other practical means are not reasonably available, and
• Pretreatment is provided by discharging to a modified type 2 catch basin (with a
flow restrictor or oil/water separator) or water quality vault, and
• The discharge is upstream of a basic or enhanced stormwater treatment BMP,
and
• The storm sewer system owner/operator has granted approval.
Other practical means include the use of decanting facilities and field decant sites that discharge to
sanitary sewers or discharge to an approved stormwater treatment BMP.
Limited field testing of flocculent aids has been conducted. While the use of flocculent aids is
promising, sufficient testing has not been conducted to allow approval of any specific product or
process. In general, the following conditions must be met for flocculent use to be approved:
• The flocculent must be non-toxic under circumstances of use and approved for
use by the Department of Ecology.
• The decant must be discharged to an approved basic or enhanced stormwater
treatment BMP, with sufficient capacity and appropriate design to handle the
anticipated volume and pollutant loading.
• The discharge must be approved by the storm sewer system owner/operator.
Water removed from stormwater ponds, vaults, and oversized catch basins may be returned
to storm sewer system. Stormwater ponds, vaults, and oversized catch basins contain substantial
amounts of liquid, which hampers the collection of solids and poses problems if the removed waste
must be hauled away from the site. Water removed from these facilities may be discharged back into
the pond, vault, or catch basin provided:
• Clear water removed from a stormwater treatment structure may be discharged
directly to a downgradient cell of a treatment pond or into the storm sewer
system.
• Turbid water may be discharged back into the structure it was removed from if:
o The removed water has been stored in a clean container (eductor truck,
Baker tank, or other appropriate container used specifically for handling
stormwater or clean water) and
o There will be no discharge from the treatment structure for at least
24 hours.
• The discharge must be approved by the storm sewer system owner/operator.
Vegetation management and structural integrity concerns sometimes require that the ponds be
refilled as soon after solids removal as possible. For ponds and other systems relying on biological
processes for waste treatment, it is often preferable to reuse at least some portion of the removed
water.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 596
Site Evaluation
A site evaluation is suggested as method to identify spill sites or locations that are more polluted than
normal.
The site evaluation will aid in determining if waste should be handled as dangerous waste and in
determining what to test for if dangerous waste is suspected. The site evaluation will also help to
determine if the waste does not meet the requirements of the end users.
There are three steps to a site evaluation:
1. A historical review of the site for spills, previous contamination, and nearby toxic cleanup
sites and dangerous waste and materials.
The historical review will be easier if done on an area wide basis prior to scheduling any waste
collection. The historical review should be more thorough for operators who never collected
waste at a site before. At a minimum, the historical review should include operator knowledge of
the area's collection history or records kept from previous waste collections.
Private operators should ask the owner of the site for records of previous contamination and the
timing of the most recent cleaning. Ecology’s Hazardous Substance Information Office maintains
a Toxic Release Inventory and a “Facility Site” web page, tracking more than 15,000 sites. This
information is available through the Internet at http://www.wa.gov/ecology/iss/fsweb/fshome.html
or by calling a toll-free telephone number (800-633-7585). The web page allows anyone with
web-access to search for facility information by address, facility name, town, zip code, and SIC
code, etc. It lists why the Department of Ecology is tracking each one (NPDES, TSCA, RCRA,
Clean Air Act, etc.), as well as who to call within Ecology to find out more about the given facility.
2. An area visual inspection for potential contaminant sources such as a past fire, leaking
tanks and electrical transformers, and surface stains.
The area around the site should be evaluated for contaminant sources prior to collection of the
waste. The area visual inspection may be done either as part of multiple or as single site
inspections. If a potential contaminant source is found, the waste collection should be delayed
until the potential contaminant is assessed.
A second portion of the area visual inspection is a subjective good housekeeping evaluation of
the area. Locations with poor housekeeping commonly cut corners in less obvious places and
should be inspected in greater detail for illegal dumping and other contamination spreading
practices.
3. A waste and container inspection before and during collection.
The inspection of the waste and catch basin or vault is the last and perhaps most critical step in
the site evaluation.
For example, if the stormwater facility has an unusual color in or around it, then there is a strong
possibility that something could have been dumped into it. Some colors to be particularly wary of
are yellow-green from antifreeze dumping and black and/or rainbow sheen from oil and/or grease
dumping. In addition, if any staining or corrosion is observed, then a solvent may have been
dumped.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 597
Fumes are also good indicators of potential dangerous conditions or dangerous waste.
Deliberate smelling of catch basins should be avoided for worker safety, but suspicious odors
may be encountered from catch basins thought to be safe. Some suspicious odors are rotten
eggs (hydrogen sulfide is present), gasoline or diesel fumes, or solvent odors. If unusual odors
are noted, contact a dangerous waste inspector before cleaning the basin.
Finally, operator experience is the best guide to avoid collection of contaminated waste.
Table IV-D-2. Typical TPH Levels in Street Sweeping and Catch Basin Solids
Reference Street Sweeping
(mg/kg)
Catch Basin Solid
(mg/kg)
Snohomish County 1
(Landau 1995)
390 – 4300
King County (1)
(Herrera 1995)
123 – 11049
(Median 1036)
Snohomish County & Selected Cities 1
(W & H Pacific, 1993)
163 - 1500
(Median 760)
163 – 1562
(Median 760)
City of Portland 2
(Bresch)
MDL – 1830
(Median – 208)
Oregon1
(Collins; ODOT 1998)
Oregon 3
(Collins; ODOT 1998)
1600 – 2380
98 - 125
1 Method WTPH 418.1; does not incorporate new methods to reduce background interference due to vegetative material
2 Method NWTPH-Dx
3 Method WTPH – HCID
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 598
Table IV-D-3. Typical c-PAH Values in Street Waste Solids and Related Materials
Sample Source City of Everett WSDOT
Analyte Street
Sweepings
Soil 3-Way
Topsoil
Vactor
Solids
Leaf &
Sand
Sweepings
– Fresh
Sweepings
Weathered
Benzo(a)anthracene 0.1U 0.076U 0.074U 0.21 0.45 0.56 0.40
Chrysene 0.14 0.09 0.074U 0.32 0.53 0.35 0.35
Benzo(b)fluoranthene 0.11 0.076U 0.074U 0.27 0.52 0.43 0.51
Benzo(k)fluoranthene 0.13 0.076U 0.074U 0.25 0.38 0.39 0.40
Benzo(a)pyrene 0.13 0.076U 0.074U 0.26 0.5 0.41 0.33U
Indeno(1,2,3-cd)pyrene 0.1U 0.076U 0.074U 0.19 0.39 NR NR
Dibenzo(a,h)anthracene 0.1U 0.076U 0.074U 0.081 0.12 0.39 0.33U
Revised MTCA
Benzo(a)pyrene
[ND=PQL]
0.215 0.134 0.134 0.388 0.727 0.708 0.597
Benzo(a)pyrene
[ND=1/2 PQL]
0.185 0.069 0.067 0.388 0.727 0.708 0.366
Benzo(a)pyrene [See *
below]
0.185 0.069 0 0.388 0.727 0.708 0.366
Benzo(a)pyrene [ND=0] 0.155 0.001 0 0.388 0.727 0.708 0.135
*If the analyte was not detected for any PAH, then ND=0; If analyte was detected in at least 1 PAH, then ND=1/2PQL;
If the average concentration (using ND=1/2 PQL) is greater than the maximum detected value, then ND=Maximum
value.
The new Method A soil cleanup level for unrestricted land use is 0.1 mg/Kg for BAP. (WAC 173-340-900, Table 740-1)
The new Method A soil cleanup level for industrial properties is 2 mg/Kg for BAP. (WAC 173-340-900, Table 745-1)
Table IV-D-4. Typical Metals Concentrations in Catch Basin Sediments
PARAMETER Ecology 1993 Thurston 1993 King County
1995
King County 1995
METALS; TOTAL
(mg/kg)
(Min – Max) (Min – Max) (Min - Max) Mean
As <3 -- 24 .39 -- 5.4 4 – 56 0.250
Cd 0.5 -- 2.0 < 0.22 -- 4.9 0.2 – 5.0 0.5
Cr 19 -- 241 5.9 -- 71 13 - 100 25.8
Cu 18 -- 560 25 -- 110 12 - 730 29
Pb 24 -- 194 42 -- 640 4 – 850 80
Ni 33 -- 86 23 -- 51 14 – 41 23
Zn 90 -- 558 97 -- 580 50 – 2000 130
Hg .04 -- .16 .024 -- .193
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 599
Table IV-D-5. Recommended Parameters & Suggested Values for Determining
Reuse & Disposal Options
Parameter Suggested Maximum Value
Arsenic, Total 20.0 mg/kg (a)
Cadmium, Total 2.0 mg/kg (b)
Chromium, Total 42 mg/kg (c)
Lead, total 250 mg/kg (d)
Nickel 100 mg/kg (e)
Zinc 270 mg/kg (e)
Mercury (Inorganic) 2.0 mg/kg (f)
PAHs (Carcinogenic) 0.1 – 2.0 mg/kg (see Note at (g) below)
TPH (Heavy Fuel Oil) 200 - 460 mg/kg (see Note at (h) below)
TPH (Diesel) 200 – 460 mg/kg (see Note at (h) below)
TPH (Gasoline) 100 mg/kg (i)
Benzene 0.03 mg/kg (i)
Ethylbenzene 6 mg/kg (i)
Toluene 7 mg/kg (i)
Xylenes (Total) 9 mg/kg (i)
a Arsenic: from MTCA Method A - Table 740-1: Soil cleanup levels for unrestricted land uses
b Cadmium: from MTCA Method A – Table 740-1: Soil cleanup levels for unrestricted land uses.
c Chromium; from MTCA Method A - Table 740-1: Soil cleanup levels for unrestricted land uses
d Lead; from MTCA Method A – Table 740-1: Soil cleanup levels for unrestricted land uses
e Nickel and Zinc; from MTCA Table 749-2: Protection of Terrestrial Plants and Animals
f Mercury; from MTCA Method A – Table 740-1: Soil cleanup levels for unrestricted land uses
g PAH-Carcinogenic; from MTCA Method A – Table 740-1: Soil cleanup levels for unrestricted land uses and Table
745-1, industrial properties, based on cancer risk via direct contact with contaminated soil (ingestion of soil) in
residential land use situations and commercial/industrial land uses. Note: The local health department may permit
higher levels as part of a Plan of Operation, where they determine that the proposed end use poses little risk of
direct human contact or ingestion of soil.
h TPH: from MTCA Tables 749-2 & 749-3: Protection of Terrestrial Plants and Animals. Values up to 460 mg/kg may
be acceptable where the soils are capped or covered to reduce or prevent exposure to terrestrial plants and
animals. Where the laboratory results report no ‘fingerprint’ or chromatographic match to known petroleum
hydrocarbons, the soils will not be considered to be petroleum contaminated soils.
i BETX; from MTCA Method A - Table 740-1: Soil cleanup levels for unrestricted land uses.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 600
Table IV-D-6. Recommended Sampling Frequency for Street Waste Solids
Cubic Yards of Solids Minimum Number of Samples
0 – 100 3
101 – 500 5
501 – 1000 7
1001 – 2000 10
>2000 10 + 1 for each additional 500 cubic yards
*Modified from Ecology’s Interim Compost Guidelines
Table IV-D-7. Pollutants in Catch Basin Solids – Comparison to Dangerous Waste Criteria
PARAMETER Range of Values in Catch
Basin Waste
Range of Values in
Catch Basin Waste Dangerous Waste Criteria
METALS Total Metals (mg/kg) TCLP Metals
(mg/kg) TCLP values (mg/l)
Arsenic <3 – 56 < .02 - 0 .5 5.0
Cadmium <.22 – 5 .0002 - .03 1.0
Chromium 5.9 - 241 .0025 - .1 5.0
Copper 12 - 730 .002 -- .88 none
Lead 4 - 850 .015 -- 3.8 5.0
Nickel 23 - 86 < .01 -- .36 none
Zinc 50 - 2000 .04 -- 6.7 none
Mercury .02 - .19 .0001 -- .0002 0.2
* Data from Thurston County (Thurston County 1993), King County (Herrera 1995) and Ecology (Serdar; Ecology
1993).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 601
Table IV-D-8. Typical Catch Basin Decant Values Compared to Surface Water Quality Criteria
PARAMETER State Surface Water Quality Criteria Range of Values
Reported
Range of Values
Reported
METALS
Freshwater Acute
(ug/l – dissolved
metals)
Freshwater Chronic
(ug/l – dissolved
metals)
Total Metals
(ug/l)
Dissolved Metals
(ug/l)
Arsenic 360 190 100 – 43000 60 - 100
Cadmium* 2.73 0.84 64 - 2400 2 - 5
Chromium (total) 13 -- 90000 3 - 6
Chromium (III)* 435 141
Chromium (VI) 0.5 10
Copper* 13.04 8.92 81 -- 200000 3 - 66
Lead* 47.3 1.85 255 -- 230000 1 - 50
Nickel* 1114 124 40 -- 330 20 - 80
Zinc* 90.1 82.3 401 -- 440000 1900 - 61000
Mercury 2.10 .012 0.5 -- 21.9
*Hardness dependent; hardness assumed to be 75 mg/l
Table IV-D-9. Typical Values for Conventional Pollutants in Catch Basin Decant
PARAMETER Ecology 1993 (Min - Max) King County 1995 (Min - Max)
Values as mg/l; except where
stated Mean Mean
PH 6.94 6.18 - 7.98 8 6.18 - 11.25
Conductivity (umhos/cm) 364 184 - 1110 480 129 - 10,100
Hardness (mg/l CaCO3) 234 73 - 762
Fecal Coliform (MPN/100 ml) 3000
BOD 151 28 - 1250
COD 900 120 - 26,900
Oil & Grease 11 7.0 - 40 471 15 - 6242
TOC 136 49 - 7880 3670 203 - 30,185
Total Solids 1930 586 - 70,400
Total Dissolved Solids 212 95 - 550
Total Suspended Solids 2960 265 - 111,000
Settleable Solids (ml/l/hr) 27 2 - 234 57 1 - 740
Turbidity (ntu) 1000 55 - 52,000 4673 43 - 78,000
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Recommendations for Management Volume IV
of Street Wastes Appendix D 602
Table IV-D-10. Catch Basin Decant Values Following Settling*
Parameter; Total Metals in
mg/l
Portland – Inverness
Site
Min - Max
King County -
Renton
Min - Max
METRO
Pretreatment
Discharge Limits
Arsenic .0027 .015 < MDL – 0.12 4
Cadmium .0009 - .0150 < MDL – 0.11 0.6
Chromium .0046 - .0980 .017 – .189 5
Copper .015 - .8600 .0501 – .408 8
Lead .050 – 6.60 .152 – 2.83 4
Nickel .0052 - .10 .056 - .187 5
Silver .0003 - .010 < MDL 3
Zinc .130 – 1.90 .152 – 3.10 10
Settleable Solids; ml/L No Data .02 - 2 7
Nonpolar FOG 5.7 - 25 5 - 22 100
Ph (std) 6.1 – 7.2 6.74 – 8.26 5.0 - 12.0
TSS 2.8 - 1310
Recorded Total Monthly Flow;
Gallons
Data not available 31,850 - 111,050
Recorded Max. Daily Flow;
Gallons
Data not available 4,500 - 18,600 25,000 GPD
Calculated Average Daily
Flow; GPD
Data not available 1517 - 5428
* Data from King County’s Renton Facility (data from 1998 – 1999) and the City of Portland’s Inverness Site (data
from 1999 – 2001); detention times not provided
Volume V
i Table of Contents
Volume V – Water Quality
Treatment BMPs
Table of Contents
Purpose of this Volume...................................................................................................................603
Content and Organization of this Volume.......................................................................................603
Chapter 1 Treatment Facility Selection Process.............................................................604
1.1 Step-by-Step Selection Process for Treatment Facilities......................................................604
Chapter 2 Treatment Facility Menus.................................................................................610
2.1 Oil Control Menu....................................................................................................................610
2.1.1 Performance Goal............................................................................................................610
2.1.2 Options.............................................................................................................................610
2.1.3 Application on the Project Site.........................................................................................611
2.2 Phosphorus Treatment Menu................................................................................................611
2.2.1 Performance Goal............................................................................................................611
2.2.2 Options.............................................................................................................................611
2.3 Enhanced Treatment Menu...................................................................................................612
2.3.1 Performance Goal............................................................................................................612
2.3.2 Options.............................................................................................................................612
2.4 Basic Treatment Menu..........................................................................................................613
2.4.1 Performance Goal............................................................................................................613
2.4.2 Options.............................................................................................................................614
Chapter 3 General Requirements for Stormwater Facilities...........................................615
3.1 Design Flow Volume and Flow Rate.....................................................................................615
3.1.1 Water Quality Design Flow Volume.................................................................................615
3.1.2 Water Quality Design Flow Rate.....................................................................................616
3.1.3 Flows Requiring Treatment..............................................................................................616
3.2 Sequence of Facilities...........................................................................................................617
3.3 Setbacks, Slopes, and Embankments...................................................................................618
3.3.1 Setbacks..........................................................................................................................618
3.3.2 Side Slopes and Embankments......................................................................................619
3.4 Facility Liners.........................................................................................................................620
3.4.1 General Design Criteria...................................................................................................620
3.4.2 Design Criteria for Treatment Liners...............................................................................622
3.4.3 Design Criteria for Low Permeability Liner Options.........................................................622
Volume V
ii Table of Contents
3.4.3.1 Compacted Till Liners............................................................................................622
3.4.3.2 Clay Liners............................................................................................................623
3.4.3.3 Geomembrane Liners............................................................................................623
3.4.3.4 Concrete Liners.....................................................................................................624
3.5 Hydraulic Structures..............................................................................................................624
3.5.1 Flow Splitter Designs.......................................................................................................624
3.5.1.1 General Design Criteria.........................................................................................624
3.5.1.2 Materials................................................................................................................624
3.5.2 Flow Spreading Options..................................................................................................627
3.5.2.1 General Design Criteria.........................................................................................627
Chapter 4 Pretreatment.....................................................................................................632
4.1 Purpose.................................................................................................................................632
4.2 Application.............................................................................................................................632
4.3 BMPs for Pretreatment..........................................................................................................632
4.3.1 BMP T610 Presettling Basin............................................................................................632
4.3.1.1 Purpose and Definition..........................................................................................632
4.3.1.2 Application and Limitations...................................................................................632
4.3.1.3 Design Criteria.......................................................................................................632
4.3.1.4 Site Constraints and Setback Requirements........................................................633
Chapter 5 Infiltration and Bio-infiltration Treatment Facilities.......................................634
5.1 Purpose.................................................................................................................................634
5.2 Application.............................................................................................................................634
5.3 Site Suitability........................................................................................................................634
5.3.1 Setback Criteria (SSC-1).................................................................................................635
5.3.2 Groundwater Protection Areas (SSC-2)..........................................................................635
5.3.3 High Vehicle Traffic Areas (SSC-3).................................................................................635
5.3.4 Soil Infiltration Rate/Drawdown Time for Treatment (SSC-4)..........................................636
5.3.4.1 Infiltration Rates: Short-term and Long-term.........................................................636
5.3.4.2 Drawdown Time....................................................................................................636
5.3.5 Depth to Bedrock, Water Table, or Impermeable Layer (SSC-5)....................................636
5.3.6 Soil Physical and Chemical Suitability for Treatment (SSC-6)........................................637
5.3.7 Seepage Analysis and Control (SSC-7)..........................................................................637
5.3.8 Cold Climate and Impact of Roadway Deicers (SSC-8)..................................................637
5.3.9 Verification Testing of the Completed Facility.................................................................637
5.4 Site Characterization.............................................................................................................638
5.4.1 Field Methods used to Determine Subsurface Characterization.....................................638
5.4.1.1 Test Holes or Pits..................................................................................................638
5.4.1.2 Infiltration Rate Determination...............................................................................639
5.4.1.3 Infiltration Receptor...............................................................................................639
Volume V
iii Table of Contents
5.4.2 Design Infiltration Rate Determination.............................................................................640
5.4.2.1 Three Methods for Determining Long-term Infiltration Rate for Sizing the Infiltration
Basin, Trench, or Swale........................................................................................640
5.4.2.2 General Sizing Criteria..........................................................................................642
5.4.2.3 General Design Criteria.........................................................................................643
5.4.2.4 General Construction Criteria................................................................................643
5.4.2.5 Maintenance Criteria.............................................................................................644
5.4.2.6 Verification of Performance...................................................................................644
5.5 BMPs for Infiltration and Bio-infiltration Treatment................................................................644
5.5.1 BMP T710 Infiltration Basins...........................................................................................645
5.5.1.1 Description............................................................................................................645
5.5.1.2 Design Criteria Specific for Basins........................................................................645
5.5.1.3 Maintenance Criteria for Basins............................................................................645
5.5.2 BMP T720 Infiltration Trenches.......................................................................................646
5.5.2.1 Description............................................................................................................646
5.5.2.2 Design Criteria.......................................................................................................646
5.5.2.3 Construction Criteria..............................................................................................646
5.5.2.4 Maintenance Criteria.............................................................................................647
5.5.3 BMP T730 Bio-infiltration Swale......................................................................................648
5.5.3.1 Description............................................................................................................648
5.5.3.2 Additional Design Criteria Specific for Bio-infiltration Swales...............................648
Chapter 6 Sand Filtration Treatment Facilities................................................................650
6.1 Purpose.................................................................................................................................650
6.2 Description.............................................................................................................................650
6.3 Applications and Limitations..................................................................................................656
6.4 Site Suitability........................................................................................................................656
6.5 Design Criteria.......................................................................................................................656
6.5.1 Objective..........................................................................................................................656
6.5.2 Sand Filter Sizing.............................................................................................................656
6.6 Construction Criteria..............................................................................................................659
6.7 Maintenance Criteria.............................................................................................................659
6.7.1 BMP T810 Sand Filter Vault............................................................................................661
6.7.1.1 Description: (Figure V-6-13 and Figure V-6-14)....................................................661
6.7.1.2 Applications and Limitations..................................................................................661
6.7.1.3 Additional Design Criteria for Vaults.....................................................................661
6.7.2 BMP T820 Linear Sand Filter.........................................................................................664
6.7.2.1 Description............................................................................................................664
6.7.2.2 Application and Limitations...................................................................................664
6.7.2.3 Additional Design Criteria for Linear Sand Filters.................................................664
Chapter 7 Biofiltration Treatment Facilities.....................................................................666
7.1 Purpose.................................................................................................................................666
7.2 Applications...........................................................................................................................666
Volume V
iv Table of Contents
7.3 Site Suitability........................................................................................................................666
7.4 Best Management Practices..................................................................................................666
7.4.1 BMP T910 Basic Biofiltration Swale................................................................................667
7.4.1.1 Description:...........................................................................................................667
7.4.1.2 Design Criteria:......................................................................................................667
7.4.1.3 Bypass Guidance..................................................................................................671
7.4.1.4 Sizing Procedure for Biofiltration Swales..............................................................671
7.4.1.5 Soil Criteria............................................................................................................678
7.4.1.6 Vegetation Criteria.................................................................................................679
7.4.1.7 Construction Criteria..............................................................................................679
7.4.1.8 Maintenance Criteria.............................................................................................679
7.4.2 BMP T920 Wet Biofiltration Swale...................................................................................683
7.4.2.1 Description............................................................................................................683
7.4.2.2 Performance Objectives........................................................................................683
7.4.2.3 Applications/Limitations.........................................................................................683
7.4.2.4 Criteria...................................................................................................................683
7.4.3 BMP T930 Continuous Inflow Biofiltration Swale............................................................685
7.4.3.1 Description:...........................................................................................................685
7.4.3.2 Applications...........................................................................................................685
7.4.3.3 Design Criteria.......................................................................................................685
7.4.4 BMP T940 Basic Filter Strip.............................................................................................686
7.4.4.1 Description............................................................................................................686
7.4.4.2 Applications/Limitations.........................................................................................686
7.4.4.3 Design Criteria for Filter strips:..............................................................................688
7.4.4.4 Sizing Procedure...................................................................................................688
7.4.5 BMP T950 Narrow Area Filter Strip.................................................................................689
7.4.5.1 Description:...........................................................................................................689
7.4.5.2 Applications/Limitations:........................................................................................689
7.4.5.3 Design Criteria:......................................................................................................689
Chapter 8 Wetpool Facilities.............................................................................................691
8.1 Purpose.................................................................................................................................691
8.2 Best Management Practices..................................................................................................691
8.2.1 BMP T1010 Wetponds - Basic and Large.......................................................................692
8.2.1.1 Description:...........................................................................................................692
8.2.1.2 Design Criteria:......................................................................................................692
8.2.1.3 Sizing Procedure...................................................................................................695
8.2.1.4 Wetpool Geometry................................................................................................701
8.2.1.5 Berms, Baffles, and Slopes...................................................................................701
8.2.1.6 Embankments.......................................................................................................702
8.2.1.7 Inlet and Outlet......................................................................................................702
8.2.1.8 Access and Setbacks............................................................................................703
8.2.1.9 Planting Requirements..........................................................................................703
8.2.1.10 Recommended Design Features..........................................................................704
Volume V
v Table of Contents
8.2.1.11 Construction Criteria:.............................................................................................707
8.2.1.12 Operation and Maintenance:.................................................................................707
8.2.2 BMP T1020 Wetvaults.....................................................................................................708
8.2.2.1 Description:...........................................................................................................708
8.2.2.2 Applications and Limitations:.................................................................................708
8.2.2.3 Design Criteria:......................................................................................................708
8.2.2.4 Wetpool Geometry................................................................................................710
8.2.2.5 Vault Structure.......................................................................................................710
8.2.2.6 Inlet and Outlet......................................................................................................711
8.2.2.7 Access Requirements...........................................................................................711
8.2.2.8 Access Roads, Right of Way, and Setbacks.........................................................711
8.2.2.9 Recommended Design Features..........................................................................712
8.2.2.10 Construction Criteria..............................................................................................712
8.2.2.11 Operation and Maintenance..................................................................................712
8.2.2.12 Modifications for Combining with a Baffle Oil/Water Separator............................713
8.2.3 BMP T1030 Stormwater Treatment Wetlands.................................................................714
8.2.3.1 Description............................................................................................................714
8.2.3.2 Applications and Limitations..................................................................................714
8.2.3.3 Design Criteria.......................................................................................................714
8.2.3.4 Sizing Procedure...................................................................................................714
8.2.3.5 Wetland Geometry................................................................................................715
8.2.3.6 Lining Requirements.............................................................................................715
8.2.3.7 Inlet and Outlet......................................................................................................716
8.2.3.8 Access and Setbacks............................................................................................716
8.2.3.9 Planting Requirements..........................................................................................719
8.2.3.10 Construction Criteria..............................................................................................719
8.2.3.11 Operation and Maintenance..................................................................................719
8.2.4 BMP T1040 Combined Detention and Wetpool Facilities ...............................................720
8.2.4.1 Description:...........................................................................................................720
8.2.4.2 Applications and Limitations:.................................................................................720
8.2.4.3 Design Criteria:......................................................................................................720
8.2.4.4 Sizing.....................................................................................................................723
8.2.4.5 Detention and Wetpool Geometry.........................................................................723
8.2.4.6 Berms, Baffles and Slopes....................................................................................723
8.2.4.7 Inlet and Outlet......................................................................................................723
8.2.4.8 Access and Setbacks............................................................................................723
8.2.4.9 Planting Requirements..........................................................................................723
8.3 Combined Detention and Wetvault........................................................................................724
8.4 Combined Detention and Stormwater Wetland.....................................................................726
8.4.1 Sizing Criteria..................................................................................................................726
8.4.2 Design Criteria.................................................................................................................726
8.4.3 Inlet and Outlet Criteria....................................................................................................726
8.4.4 Planting Requirements....................................................................................................726
Volume V
vi Table of Contents
Chapter 9 Oil and Water Separators.................................................................................727
9.1 Purpose.................................................................................................................................727
9.2 Description.............................................................................................................................727
9.3 Applications/Limitations.........................................................................................................727
9.4 Site Suitability........................................................................................................................730
9.5 Design Criteria.......................................................................................................................731
9.5.1 General Considerations...................................................................................................731
9.5.2 Criteria for Separator Bays..............................................................................................731
9.5.3 Criteria for Baffles............................................................................................................732
9.6 Oil and Water Separator BMPs.............................................................................................732
9.6.1 BMP T1110 API (Baffle type) Separator Bay..................................................................733
9.6.1.1 Design Criteria.......................................................................................................733
9.6.1.2 Sizing Criteria........................................................................................................733
9.6.2 BMP T1111 Coalescing Plate (CP) Separator Bay.........................................................735
9.6.2.1 Design Criteria.......................................................................................................735
9.6.2.2 Operation and Maintenance..................................................................................735
Chapter 10 Emerging Technologies...................................................................................737
10.1 Background............................................................................................................................737
10.2 Emerging Technology and the City of Auburn.......................................................................737
10.3 Ecology Role in Evaluating Emerging Technologies.............................................................737
10.4 Evaluation of Emerging Technologies...................................................................................737
10.5 Assessing Levels of Development of Emerging Technologies.............................................738
10.6 Examples of Emerging Technologies for Stormwater Treatment and Control......................739
Appendix A Basic Treatment Receiving Waters.................................................................741
Appendix B Procedure for Conducting a Pilot Infiltration Test.........................................743
Appendix C Geotextile Specifications.................................................................................745
Appendix D Turbulence and Short-Circuiting Factor.........................................................747
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Purpose Volume V
Content and Organization Introduction 603
Volume V:
Water Quality Treatment BMPs
Purpose of this Volume
This volume focuses on treatment of runoff to remove pollutants at developed sites. Typical pollutants
of concern include sand, silt, and other suspended solids; metals such as copper, lead, and zinc;
nutrients (e.g., nitrogen and phosphorous); certain bacteria and viruses; and organics such as
petroleum hydrocarbons and pesticides. Methods of pollutant removal include sedimentation/settling,
filtration, infiltration, plant uptake, ion exchange, adsorption, and bacterial decomposition. Floatable
pollutants such as oil, debris, and scum can be removed with separator structures. The purpose of
this volume is to provide criteria for selection and design of permanent runoff treatment facilities.
Use this volume to select permanent water quality treatment BMPs. Include the BMPs and the design
criteria used in your Stormwater Site Plan (see Volume I). This volume should be used as an aid in
designing and constructing water quality treatment BMPs.
Content and Organization of this Volume
Volume V contains ten chapters and four appendices:
• Chapter 1 outlines a step-by-step process for selecting treatment facilities for new
development and redevelopment projects.
• Chapter 2 presents treatment facility “menus” that are used in applying the step-by-
step process presented in Chapter 1. These menus cover different treatment needs
that are associated with different sites.
• Chapter 3 discusses general requirements for treatment facilities.
• Chapter 4 describes using a pretreatment facility to remove suspended solids prior to
runoff treatment facilities.
• Chapter 5 through Chapter 9 provide detailed information regarding specific types of
treatment facilities identified in the menus in Chapter 2.
• Chapter 10 discusses special considerations for emerging technologies for
stormwater treatment.
• The appendices provide more detailed information on selected topics referenced in
the preceding chapters.
Volume
V
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 604
Chapter 1 Treatment Facility Selection Process
This chapter describes a step-by-step process for selecting the type of treatment facilities that will
apply to individual projects.
1.1 Step-by-Step Selection Process for Treatment Facilities
Use the step-by-step process outlined below to determine the type of treatment facilities applicable to
the project.
Step 1. Determine the receiving waters and pollutants of concern
Step 2. Determine if oil treatment is required
Step 3. Determine if infiltration for pollutant removal is possible
Step 4. Determine if control of phosphorus is required
Step 5. Determine if enhanced treatment is required
Step 6. Determine if basic treatment is required
Step 7. Consider other factors that may influence the selection of a treatment facility
Step 8. Select an appropriate treatment facility or treatment train for each type of
treatment required
Step 1: Determine the Receiving Waters and Pollutants of Concern Based on Offsite Analysis
The project proponent must determine the natural receiving water for the stormwater drainage from
the project site (groundwater, wetland, lake, stream, or salt water). This is necessary to determine the
applicable treatment menu from which to select treatment facilities. If the discharge is to the City of
Auburn’s municipal storm drainage system, the applicant must determine the final discharge point.
Watershed specific requirements and/or specific protection areas are outlined in Chapter 2 of
Volume V.
Step 2: Determine if an Oil Control Facility/Device is Required
Oil control is required for projects that have high-use sites. High-use sites are those that typically
generate high concentrations of oil due to high traffic turnover or the frequent transfer of oil. High-use
sites include:
• An area of a commercial or industrial site subject to an expected average daily traffic
(ADT) count equal to or greater than 100 vehicles per 1,000 square feet of gross
building area;
• An area of a commercial or industrial site subject to petroleum storage and transfer
in excess of 1,500 gallons per year, not including routinely delivered heating oil;
• An area of a commercial or industrial site subject to parking, storage or maintenance
of 25 or more motorized vehicles that are over 10 tons gross weight (trucks, buses,
trains, heavy equipment, etc.);
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 605
• A road intersection with a measured ADT count of 25,000 vehicles or more on the
main roadway and 15,000 vehicles or more on any intersecting roadway, excluding
projects proposing primarily pedestrian or bicycle use improvements.
The traffic count can be estimated using information from “Trip Generation” published by the Institute
of Transportation Engineers, or from a traffic study prepared by a professional engineer or
transportation specialist with experience in traffic estimation.
The following urban land uses are likely to have areas that fall within the definition of “high-use sites”
or have sufficient quantities of free oil present that can be treated by an API or CP-type oil/water
separator:
• Industrial Machinery and Equipment, and Railroad Equipment Maintenance
• Log Storage and Sorting Yards
• Aircraft Maintenance Areas
• Railroad Yards
• Fueling Stations
• Vehicle Maintenance and Repair
• Construction Businesses (paving, heavy equipment storage and maintenance,
storage of petroleum products)
• Any other sites that generate high concentrations of oil.
In general, all-day parking areas are not intended to be defined as high-use sites, and should not
require oil control treatment outlined in Section 2.1. Gasoline stations, with or without small food
stores, will likely exceed the high-use site threshold. The petroleum storage and transfer criterion is
intended to address regular transfer operations such as gasoline service stations, not occasional
filling of heating oil tanks.
Note: Some land use types require the use of a spill control (SC-type) oil/water separator. Those
situations are described in IV and are separate from this oil treatment requirement.
Step 3: Determine if Infiltration for Pollutant Removal is Possible
Use Volume V, Chapter 5 as a guide to determine if the site contains soils that are conducive to
infiltration. For sites located in Groundwater Protection Area 2 (see Volume I, Chapter 2) this
option is not allowed.
Infiltration treatment facilities must be preceded by a pretreatment facility, such as a presettling basin
or vault, to reduce the occurrence of plugging. Any of the basic treatment facilities, and detention
ponds designed to meet flow control requirements, can also be used for pretreatment. If an oil/water
separator is necessary for oil control, it can also function as the pre-settling basin as long as the
influent suspended solids concentrations are not high. However, frequent inspections are necessary
to determine when accumulated solids exceed the 6-inch depth at which clean-out is recommended.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 606
Step 4: Determine if Phosphorus Treatment is Required
Step 5: Determine if Enhanced Treatment is Required
Enhanced treatment is required for the following project sites that discharge to fish-bearing streams,
lakes, or to waters or conveyance systems tributary to fish-bearing streams or lakes:
• Industrial sites,
• Commercial sites,
• Multi-family sites, and
• High AADT roads as follows:
o Fully controlled and partially controlled limited access highways with Annual
Average Daily Traffic (AADT) counts of 15,000 or more
o All other roads with an AADT of 7,500 or greater
Sites listed above that discharge directly (or, indirectly through a municipal storm sewer system) to
Basic Treatment Receiving Waters, and portions of the above-listed project sites that are only subject
to Basic Treatment requirements (see Step 6) are not required to provide enhanced treatment. For
developments with a mix of land use types, the Enhanced Treatment requirement shall apply when
the runoff from the areas subject to the Enhanced Treatment requirement comprises 50% or more of
the total runoff within a threshold discharge area. Basic Treatment Receiving Waters within the City
of Auburn include the Green River and the White River. Basic Treatment Receiving Waters identified
by Ecology are listed in Appendix A.
If the project must apply Enhanced Treatment, select and apply an appropriate Enhanced
Treatment facility. Please refer to the Enhanced Treatment Menu in Section 2.3. Select an option
from the menu after reviewing the applicability and limitations, site suitability, and design criteria of
each for compatibility with the site. You may also use Table V-1-1 for an initial screening of options.
Step 6: Select a Basic Treatment Facility
Basic treatment is required for all sites that meet the treatment thresholds of minimum
requirement #6, see Volume I, Chapter 3.
Typical sites that require basic treatment include:
• Project sites that discharge to the ground, UNLESS:
o The soil suitability criteria for infiltration treatment are met (see Volume III,
Chapter 3), or
o The project uses infiltration strictly for flow control – not treatment - and the
discharge is within ¼ mile of a phosphorus sensitive lake (use the
Phosphorus Treatment Menu) or within ¼ mile of a fish-bearing stream or
lake (use the Enhanced Treatment Menu).
• Residential projects not otherwise needing phosphorus control as determined in
Step 4.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 607
• Project sites discharging directly to salt waters, river segments and lakes listed in
Volume V, Appendix A.
• Project sites that drain to streams that are not fish-bearing, or to waters not tributary
to fish-bearing streams.
• Landscaped areas of industrial, commercial, and multi-family project sites, and
parking lots of industrial and commercial project sites, dedicated solely to parking of
employees’ private vehicles that do not involve any other pollution-generating
sources (e.g., industrial activities, customer parking, and storage of erodible or
leachable material, wastes, or chemicals). For developments with a mix of land use
types, the Basic Treatment requirement shall apply when the runoff from the areas
subject to the Basic Treatment requirement comprises 50% or more of the total
runoff within a threshold discharge area.
Please refer to the Basic Treatment Menu in Section 2.4. Select an option from the menu
after reviewing the applicability and limitations, site suitability, and design criteria of each for
compatibility with the site.
Step 7: Consider Other Factors that May Influence the Selection of a Treatment Device
Base the selection of a treatment facility on site physical factors and pollutants of concern. Try to
choose a facility that is more likely to do a better job removing the types of pollutants generated on
the site regardless of treatment requirements. The types of site physical factors that influence facility
selection are summarized below.
1. Pollutants of Concern
Consider the land uses and potential pollutants associated with that land use.
2. Soil Type (Table V-1-1)
The permeability of the soil underlying an infiltration treatment facility can influence effectiveness.
This is particularly true for infiltration treatment facilities that are best sited in sandy to loamy sand
soils. They are not generally appropriate for sites that have final infiltration rates (f) of less than
0.5 inches per hour. Wet pond facilities situated on coarser soils will need a synthetic liner or the soils
will need to be amended to reduce the infiltration rate and provide treatment. Maintaining a
permanent pool in the first cell is necessary to avoid resuspension of settled solids. Biofiltration
swales in coarse soils can also be amended to reduce the infiltration rate.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 608
3. High Sediment Input
High total suspended solids (TSS) loads can clog infiltration soil, sand filters, and coalescing plate
oil/water separators. Pretreatment with a presettling basin, wet vault, or another basic treatment
facility would typically be necessary.
Other Physical Factors
• Slope: Steep slopes restrict the use of several BMPs. For example, biofiltration
swales are usually situated on sites with slopes of less than 6%, although greater
slopes can be considered. Infiltration BMPs are not suitable when the slope exceeds
20%.
• High Water Table: Unless there is sufficient horizontal hydraulic receptor capacity
the water table acts as an effective barrier to exfiltration and can sharply reduce the
efficiency of an infiltration system. If the high water table extends to within five
(5) feet of the bottom of an infiltration BMP, the site is seldom suitable.
• Depth to Bedrock/ Hardpan/Till: The downward exfiltration of stormwater is also
impeded if a bedrock or till layer lies too close to the surface. If the impervious layer
lies within five feet below the bottom of the infiltration BMP the site is not suitable.
Similarly, pond BMPs are often not feasible if bedrock lies within the area that must
be excavated.
• Proximity to Foundations and Wells: Since infiltration BMPs convey runoff back
into the soil, some sites may experience problems with local seepage. This can be a
real problem if the BMP is located too close to a building foundation. Another risk is
groundwater pollution; hence the requirement to site infiltration systems more than
100 feet away from drinking water wells.
• Maximum Depth: Wet ponds are also subject to a maximum depth limit for the
"permanent pool" volume. Deep ponds (greater than 8 feet) may stratify during
summer and create low oxygen conditions near the bottom resulting in re-release of
phosphorus and other pollutants back into the water.
Step 8: Select an Appropriate Treatment Device
Refer to the treatment facility menus in Chapter 2 for treatment facility options. Use Table V-1-1 as an
aid in determining which treatment device is most appropriate for the site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Volume V
Selection Process Chapter 1 609
Table V-1-1. Screening Treatment Facilities Based on Soil Type
Soil Type Infiltration
Wet
Pond*
Biofiltration*
(Swale or Filter Strip)
Coarse Sand or Cobbles N N N
Sand Y N N
Loamy Sand Y N Y
Sandy Loam Y N Y
Loam N N Y
Silt Loam N N Y
Sandy Clay Loam N Y Y
Silty Clay Loam N Y Y
Sandy Clay N Y Y
Silty Clay N Y N
Clay N Y N
Y Indicates that use of the technology is generally appropriate for this soil type.
N Indicates that use of the technology is generally not appropriate for this soil type
* Coarser soils may be used for these facilities if a liner is installed to prevent infiltration,
or if the soils are amended to reduce the infiltration rate.
Sand filtration is not listed because its feasibility is not dependent on soil type.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Menus Volume V
Chapter 2 610
Chapter 2 Treatment Facility Menus
This chapter identifies the treatment facility menus. The menus in this chapter are as follows:
• Oil Control Menu, Section 2.1
• Phosphorus Treatment Menu, Section 2.2
• Enhanced Treatment Menu, Section 2.3
• Basic Treatment Menu, Section 2.4
Performance goals apply to the water quality design storm volume or flowrate, whichever is
applicable, and apply on an average annual basis to the entire annual discharge volume (treated plus
bypassed). The incremental portion of runoff in excess of water quality design flowrate can be routed
around the facility (off-line treatment facilities) or can be passed through the facility untreated (on-line
treatment facilities) provided a net pollutant reduction is maintained. All performance goals apply to
stormwater typically found in Pacific Northwest maritime climates, where long duration, low intensity
storms predominate and stormwater contains mostly silt-sized particles.
2.1 Oil Control Menu
This menu is applicable in addition to facilities required by other treatment menus.
2.1.1 Performance Goal
The oil control menu facility options should achieve the goals of no ongoing or recurring visible
sheen, and to have a 24-hour average Total Petroleum Hydrocarbon (TPH) concentration no greater
than 10 mg/l, and a maximum of 15 mg/l for a discrete sample (grab sample).
2.1.2 Options
Oil control options include facilities that are small, treat runoff from a limited area, and require
frequent maintenance as well as facilities that treat runoff from larger areas and generally require less
frequent maintenance.
• API-Type Oil/Water Separator – See Chapter 9
• Coalescing Plate Oil/Water Separator – See Chapter 9
• Linear Sand Filter – See Chapter 6
The linear sand filter is used in the Basic, Enhanced, and Phosphorus Treatment menus
also. If used to satisfy one of those treatment requirements, the same facility shall not also be
used to satisfy the oil control requirement unless enhanced maintenance is assured. This is
to prevent clogging of the filter by oil so that it will function for suspended solids and other
pollutant removal as well. Quarterly cleaning is required when used as a combination facility.
• Emerging Stormwater Treatment Technologies for Oil Treatment – See Chapter
10
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Menus Volume V
Chapter 2 611
2.1.3 Application on the Project Site
Place oil control facilities upstream of other facilities, as close to the source of oil generation as
practical. For high-use sites located within a larger commercial center, only the impervious surface
associated with the high-use portion of the site is subject to oil treatment requirements. If common
parking for multiple businesses is provided, treatment shall be applied to the number of parking stalls
required for the high-use business only. If the treatment collection area also receives runoff from
other areas, the treatment facility must be sized to treat all water passing through it.
High-use roadway intersections shall treat lanes where vehicles accumulate during the traffic signal
cycle, including left and right turn lanes and through lanes, from the beginning of the left turn pocket.
If no left turn pocket exists, the treatable area shall begin at a distance equal to three car lengths from
the stop line. If runoff from the intersection drains to more than two collection areas that do not
combine within the intersection, treatment may be limited to any two of the collection areas.
2.2 Phosphorus Treatment Menu
2.2.1 Performance Goal
The phosphorus menu facility choices should achieve a goal of 50% total phosphorus removal for a
range of influent concentrations between 0.1 – 0.5 mg/l. The phosphorus menu facility choices must
achieve basic treatment goals in addition to phosphorus.
2.2.2 Options
Any one of the following options may be chosen to satisfy the phosphorus treatment requirement.
• Infiltration with appropriate pretreatment – See Chapter 4 and Chapter 5
o Infiltration Treatment - If infiltration is through soils meeting the minimum
site suitability criteria for infiltration treatment (see Chapter 5), a presettling
basin or a basic treatment facility can serve for pretreatment.
o Infiltration Proceeded by Basic Treatment - If infiltration is through soils
that do not meet the soil suitability criteria for infiltration treatment, treatment
must be provided by a basic treatment facility unless the soil and site fit the
description in the next option below.
o Infiltration Preceded by Phosphorus Treatment - If the soils do not meet
the soil suitability criteria and the infiltration site is within ¼ mile of a
phosphorus-sensitive receiving water, or a tributary to that water, treatment
must be provided by one of the other treatment facility options listed below.
• Large Sand Filter – See Chapter 6
• Large Wetpond – See Chapter 8
• Emerging Stormwater Treatment Technologies for Phosphorus Treatment –
See Chapter 10
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Menus Volume V
Chapter 2 612
• Two-Facility Treatment Trains – See Table V-2-2.
Table V-2-2. Treatment Trains for Phosphorus Removal
First Basic Treatment Facility Second Treatment Facility
Biofiltration Swale Basic Sand Filter or Sand Filter Vault
Filter Strip Linear Sand Filter (no presettling needed)
Linear Sand Filter Filter Strip
Basic Wetpond Basic Sand Filter or Sand Filter Vault
Wetvault Basic Sand Filter or Sand Filter Vault
Stormwater Treatment Wetland Basic Sand Filter or Sand Filter Vault
Basic Combined Detention and
Wetpool
Basic Sand Filter or Sand Filter Vault
2.3 Enhanced Treatment Menu
2.3.1 Performance Goal
The enhanced treatment facility choices should provide a higher rate of removal of dissolved metals
than basic treatment facilities. The performance goal assumes that the facility is treating stormwater
with influent dissolved copper ranging from 0.003 to 0.02 mg/l, and dissolved zinc ranging from 0.02
to 0.3 mg/l. Enhanced treatment facilities must achieve basic treatment goals in addition to enhanced
treatment goals.
2.3.2 Options
Any one of the following options may be chosen to satisfy the enhanced treatment requirement:
• Infiltration with appropriate pretreatment – See Chapter 4 and Chapter 5
o Infiltration Treatment - If infiltration is through soils meeting the minimum
site suitability criteria for infiltration treatment (see Chapter 5), a presettling
basin or a basic treatment facility can serve for pretreatment.
o Infiltration Proceeded by Basic Treatment - If infiltration is through soils
that do not meet the soil suitability criteria for infiltration treatment, treatment
must be provided by a basic treatment facility unless the soil and site fit the
description in the next option below.
o Infiltration Preceded by Enhanced Treatment - If the soils do not meet the
soil suitability criteria and the infiltration site is within ¼ mile of a fish-bearing
stream or a tributary to a fish-bearing stream treatment must be provided by
one of the other treatment facility options listed below.
• Large Sand Filter – See Chapter 6
• Stormwater Treatment Wetland – See Chapter 8
• Two Facility Treatment Trains – See Table V-2-3
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Menus Volume V
Chapter 2 613
• Compost-Amended Filter – See Chapter 7
• Bioretention/rain garden – See Volume VI
NOTE: Where bioretention/rain gardens are intended to fully meet treatment requirements,
they must be designed, using an approved continuous runoff model, to infiltrate 91% of the
influent runoff volume.
• Emerging Stormwater Treatment Technologies for Enhanced Treatment – See
Chapter 10
Table V-2-3. Treatment Trains for Enhanced Treatment
First Basic Treatment Facility Second Treatment Facility
Biofiltration Swale Basic Sand Filter or Sand Filter Vault or Media
Filter1
Filter Strip Linear Sand Filter with no pre-settling cell
needed
Linear Sand Filter Filter Strip
Basic Wetpond Basic Sand Filter or Sand Filter Vault or Media
Filter1
Wetvault Basic Sand Filter or Sand Filter Vault or Media
Filter1
Basic Combined Detention/Wetpool Basic Sand Filter or Sand Filter Vault or Media
Filter1
Basic Sand Filter or Sand Filter Vault
with a presettling cell if the filter isn’t
preceded by a detention facility
Media Filter1
1 The media must be of a type approved for use by Ecology. Refer to Ecology’s website.
2.4 Basic Treatment Menu
2.4.1 Performance Goal
The basic treatment menu facility options should achieve 80% removal of total suspended solids
(TSS) for influent concentrations ranging from 100 to 200 mg/L. For influent concentrations greater
than 200 mg/l, a higher treatment goal is appropriate. For influent concentrations less than 100 mg/l,
the facilities should achieve an effluent goal of 20 mg/l total suspended solids.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Treatment Facility Menus Volume V
Chapter 2 614
2.4.2 Options
Any one of the following options may be chosen to satisfy the basic treatment requirement:
• Bio-infiltration Swale – See Chapter 5
• Infiltration – See Chapter 5
• Sand Filters – See Chapter 6
• Biofiltration Swales – See Chapter 7
• Filter Strips – See Chapter 7
• Basic Wetpond – See Chapter 8
• Wetvault – See Chapter 8
A wetvault may be used for commercial, industrial, or road projects if there are space
limitations. The use of wetvaults is discouraged for residential projects. Combined
detention/wetvaults are allowed (see Section 8.3).
• Stormwater Treatment Wetland – See Chapter 8
• Combined Detention and Wetpool Facilities – See Chapter 8
• Bioretention/Rain Garden – See Volume VI
• Emerging Stormwater Treatment Technologies for Basic Treatment – See
Chapter 10
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 615
Chapter 3 General Requirements for Stormwater Facilities
This chapter addresses general requirements for treatment facilities. Requirements discussed in this
chapter include design volumes and flows, sequencing of facilities, liners, and hydraulic structures for
splitting or dispersing flows.
• All open detention and retention ponds shall be appropriately and aesthetically located,
designed, and planted. Pre-approval of the design concept, including landscaping, is required
for all proposed public ponds. Joint use facilities incorporating recreation or open space
opportunities are encouraged.
• All storm facility landscape planting and seeding plans shall be prepared and sealed by a
Washington State licensed professional Landscape Architect or similar specialist approved by
the City of Auburn.
• Water quality systems shall be designed for simplicity and ease of maintenance.
• Treatment systems shall be designed such that storm drainage from public streets does not
discharge into areas of private ownership or private maintenance responsibility unless a hold-
harmless and cross drainage agreement has been secured.
• The City prefers retention (infiltration) for storm drainage quantity control when soil conditions
are satisfactory for such application and water quality treatment can be provided.
3.1 Design Flow Volume and Flow Rate
3.1.1 Water Quality Design Flow Volume
The volume of runoff predicted from a 24-hour storm with a 6-month return frequency (a.k.a.,
6-month, 24-hour storm) obtained from an approved single event model. The 6-month, 24-hour
design storm of 1.44 inches shall be used in the City of Auburn.
Alternatively, the 91st percentile, 24-hour runoff volume indicated by the Western Washington
Hydrology Model (WWHM) will be used to determine the water quality design flow volume.
Treatment facility sizes are the same whether they precede, follow or are incorporated (i.e., combined
detention and wetpool facilities) into the detention facility.
Treatment options that can be sized by this method include:
• Wetponds
• Wetvaults
• Stormwater Wetlands
• Combined Detention and Wetpool Facilities
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 616
3.1.1 Water Quality Design Flow Rate
A. Preceding Detention Facilities or when Detention Facilities are not required: The
flow rate at or below which 91% of the runoff volume, as estimated by WWHM, will
be treated
• All BMPs except wetpool type facilities (Chapter 8) shall use the 15-minute time
series from WWHM. Design criteria for treatment facilities are assigned to achieve the
applicable performance goal (e.g., 80 percent TSS removal) at the water quality
design flow rate.
• Off-line facilities: For treatment facilities not preceded by an equalization or storage
basin, and when runoff flow rates exceed the water quality design flow rate, the
treatment facility shall continue to receive and treat the water quality design flow rate
to the applicable treatment performance goal. The incremental portion of runoff in
excess of the water quality design flowrate can be routed around the facility.
Treatment facilities preceded by an equalization or storage basin may identify a lower
water quality design flow rate provided that at least 91 percent of the estimated runoff
volume in the time series of an approved continuous runoff model is treated to the
applicable performance goals (e.g., 80 percent TSS removal at the water quality
design flow rate and 80 percent TSS removal on an annual average basis).
• On-line facilities: Runoff flow rates in excess of the water quality design flow rate
can be routed through the facility provided a net pollutant reduction is maintained, and
the applicable annual average performance goal is met.
B. Downstream of Detention Facilities: The full 2-year release rate from the detention
facility
• An approved continuous runoff model shall identify the 2-year return frequency flow
rate discharged by a detention facility that is designed to meet the flow duration
standard.
• Treatment facilities downstream of detention can be designed on-line or off-line. For
off-line facilities, the entire water quality design flow volume/rate must be treated.
Only flows in excess of the design flow may be bypassed.
3.1.2 Flows Requiring Treatment
Runoff from pollution-generating impervious or pervious surfaces exceeding the thresholds outlined
in Minimum Requirement #6 (Volume I, Chapter 3) must be treated using the water quality facilities in
this volume. If runoff from non-pollution generating surfaces reaches a runoff treatment BMP, flows
from those areas must be included in the sizing calculations for the facility. Once runoff from non-
pollution generating areas is mixed with runoff from pollution-generating areas, it cannot be
separated before treatment.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 617
The following are some examples of surfaces that are required to provide treatment if threshold limits
for treatment are met:
• Runoff from pollution-generating impervious surfaces (e.g. roads (paved or unpaved),
driveways, parking lots, storage yards, bike lanes within the roadway, unvegetated road
shoulders, etc.)
• Runoff from any pervious or non-impervious surface subject to the use of pesticides and
fertilizers or soil loss.
• Runoff from pervious parking areas.
• Runoff from metal roofs unless they are coated with an inert non-leachable material.
3.2 Sequence of Facilities
Treatment facilities can be placed in a variety of configurations. Some are required to be upstream
from detention facilities while others may perform better if located downstream. Detention facilities
can act as settling basins and therefore can reduce the load going to a treatment facility. Additionally,
treatment facilities can be sequenced together to provide a higher level of treatment that could be
achieved by a single facility. For instance, the enhanced treatment and phosphorus removal menus,
described in Chapter 2, include treatment options in which more than one type of treatment facility is
used, for these treatment trains the sequencing is prescribed.
Table V-3-4 summarizes placement considerations of treatment facilities in relation to detention
facilities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 618
Table V-3-4. Treatment Facility Placement in Relation to Detention Facilities
Water Quality Facility
Preceding
Detention Following Detention
Basic biofiltration swale (Chapter 7) OK OK. Prolonged flows may reduce grass
survival. Consider wet biofiltration swale
Wet biofiltration swale (Chapter 7) OK OK
Filter strip (Chapter 7) OK No—must be installed before flows
concentrate.
Basic or large wetpond (Chapter 8) OK OK—less water level fluctuation in
ponds downstream of detention may
improve aesthetic qualities and
performance.
Wetvault (Chapter 8) OK OK
Basic or large sand filter or sand
filter vault (Chapter 6)
OK, but
presettling and
control of
floatables
needed
OK—sand filters downstream of
detention facilities may require field
adjustments if prolonged flows cause
sand saturation and interfere with
phosphorus removal.
Stormwater treatment wetland/pond
(Chapter 8)
OK OK—less water level fluctuation and
better plant diversity are possible if the
stormwater wetland is located
downstream of the detention facility.
3.3 Setbacks, Slopes, and Embankments
The following guidelines for setbacks, slopes, and embankments are intended to provide for
adequate maintenance accessibility to runoff treatment facilities. Setback requirements may also be
specified by Auburn City Code, Uniform Building Code requirements, or other state regulations.
3.3.1 Setbacks
The City requires specific setbacks for sites with steep slopes, landslide areas, open water features,
springs, wells, and septic tank drain fields. Setbacks from tract lines are necessary for maintenance
access and equipment maneuverability. Adequate room for maintenance equipment shall also be
considered during site design. Project proponents should consult the Auburn City Codes to
determine all applicable setback requirements. Where a conflict between setbacks occurs, the City
shall require compliance with the most stringent of the setback requirements from the various
codes/regulations. Required setbacks are as follows or as determined by a qualified geotechnical
engineer:
• Minimum spacing between trenches shall be 4 feet measured from the edge of trench.
• Stormwater infiltration facilities, unlined wetponds and detention ponds shall be set back at
least 100 feet from open water features, drinking water wells, septic tanks or drainfields, and
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 619
springs used for public drinking water supplies. Infiltration facilities, unlined wetponds and
detention ponds upgradient of drinking water supplies and within 1, 5, and 10-year time of
travel zones must comply with Health Department requirements (Washington Wellhead
Protection Program, DOH, 12/93).
• All systems shall be at least 10 feet from any structure. If necessary, setbacks shall be
increased from the minimum 10 feet in order to maintain a 1:1 side slope for future
excavation and maintenance
• All systems shall be placed at least 5 feet from any property line. If necessary, setbacks shall
be increased from the minimum 5 feet in order to maintain a 1:1 side slope for future
excavation and maintenance.
• All facilities shall be setback from sensitive areas, steep slopes, landslide hazard areas, and
erosion hazard areas as governed by the Auburn City Code. Runoff discharged near
landslide hazard areas must be evaluated by a geotechnical engineer or qualified geologist.
The discharge point shall not be placed on or above slopes greater than 20% or above
erosion hazard areas without evaluation by a geotechnical engineer or qualified geologist and
City approval.
• For sites with septic systems, infiltration systems, unlined wetponds and detention ponds
shall be downgradient of the drainfield unless the site topography clearly prohibits subsurface
flows from intersecting the drainfield.
• Infiltration system shall be set back from sensitive areas, steep slopes, landslide hazard
areas, and erosion hazard areas as governed by the Auburn City Code. Runoff discharged
near landslide hazard areas must be evaluated by a geotechnical by a geotechnical engineer
or qualified geologist. The discharge point shall not be placed on or above slopes greater
than 20% (5H:1V) or above erosion hazard areas without evaluation by a geotechnical
engineer or qualified geologist and City approval.
Additional setbacks for specific stormwater facilities will be noted in the appropriate section.
3.3.2 Side Slopes and Embankments
• Side slopes shall not exceed a slope of 3H:1V. Moderately undulating slopes are acceptable
and can provide a more natural setting for the facility. In general, gentle side slopes improve
the aesthetic attributes of the facility and enhance safety.
• Interior side slopes may be retaining walls if the design is prepared and stamped by a
licensed civil engineer. A fence shall be provided along the top of the wall.
• Maintenance access shall be provided through an access ramp or other adequate means
(see Volume III, Chapter 2, Section 2.3.1).
• Embankments that impound water must comply with the Washington State Dam Safety
Regulations (Chapter 173-175 WAC). See Volume III, Chapter 3 for more detail concerning
Detention Ponds.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 620
3.4 Facility Liners
Liners are intended to reduce the likelihood that pollutants in stormwater will reach groundwater.
Where necessary, a liner is incorporated into the base of the treatment facility as the facility is
constructed. In addition to groundwater protection considerations, some facility types require
permanent water for proper functioning. An example is the first cell of a wetpond.
3.4.1 General Design Criteria
• Table V-3-5 shows recommendations for the type of liner generally best suited for use with
various runoff treatment facilities.
• Liners shall be evenly placed over the bottom and/or sides of the treatment area of the facility
as indicated in Table V-3-5. Areas above the treatment volume that are required to pass
flows greater than the water quality treatment flow (or volume) need not be lined. However,
the lining must be extended to the top of the interior side slope and anchored if it cannot be
permanently secured by other means.
• For low permeability liners, the following criteria apply:
o Where the seasonal high groundwater elevation is likely to contact a low
permeability liner, liner buoyancy may be a concern. A low permeability liner
shall not be used in this situation unless evaluated and recommended by a
geotechnical engineer.
o Where grass must be planted over a low permeability liner per the facility
design, a minimum of 6 inches of good topsoil or compost-amended native
soil (2 inches compost tilled into 6 inches of native till soil) must be placed
over the liner in the area to be planted. Twelve inches of cover is preferred.
• Check all liners for buoyancy stability and include calculations in project documentation.
Provide anchors as needed.
• If a treatment liner will be below the seasonal high water level, the pollutant removal
performance of the liner must be evaluated by a geotechnical or groundwater specialist and
found to be as protective as if the liner were above the level of the groundwater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 621
Table V-3-5. Lining Types Recommended for Runoff Treatment Facilities
WQ Facility Area to be Lined Type of Liner Recommended
Presettling basin Bottom and sides
Low permeability liner or
Treatment liner (If the basin
will intercept the seasonal high
groundwater table, a treatment
liner is recommended.)
Wetpond First cell: bottom and sides to
WQ design water surface
----------------------------------
Second cell: bottom and sides
to WQ design water surface
Low permeability liner or
Treatment liner (If the wet
pond will intercept the
seasonal high groundwater
table, a treatment liner is
recommended.)
--------------------------------
Treatment liner
Combined detention/WQ
facility
First cell: bottom and sides to
WQ design water surface
----------------------------------
Second cell: bottom and sides
to WQ design water surface
Low permeability liner or
treatment liner (If the facility
will intercept the seasonal high
groundwater table a treatment
liner is recommended.)
--------------------------------
Treatment liner
Stormwater wetland Bottom and sides, both cells Low permeability liner (If the
facility will intercept the
seasonal high groundwater
table, a treatment liner is
recommended.)
Sand filtration basin Basin sides only Treatment liner
Sand filter vault Not applicable No liner needed
Linear sand filter Not applicable if in vault
Bottom and sides of presettling
cell if not in vault
No liner needed
Low permeability or treatment
liner
Media filter (in vault) Not applicable No liner needed
Wet vault Not applicable No liner needed
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 622
3.4.2 Design Criteria for Treatment Liners
• A two-foot thick layer of soil with a minimum organic content of 5% and a minimum cation
exchange capacity (CEC) of 5 milliequivalents/100 grams can be used as a treatment
layer beneath a water quality or detention facility.
• To demonstrate that in-place soils meet the above criteria, one sample per 1,000 square
feet of facility area shall be tested. Each sample shall be a composite of subsamples
taken throughout the depth of the treatment layer (usually two to six feet below the
expected facility invert).
• Typically, side wall seepage is not a concern if the seepage flows through the same
stratum as the bottom of the treatment BMP. However, if the treatment soil is an
engineered soil or has very low permeability, the potential to bypass the treatment soil
through the side walls may be significant. In those cases, the treatment BMP side walls
may be lined with at least 18 inches of treatment soil, as described above, to prevent
untreated seepage. This lesser soil thickness is based on unsaturated flow as a result of
alternating wet-dry periods.
• Organic content shall be measured on a dry weight basis using ASTM D2974.
• Cation exchange capacity (CEC) shall be tested using EPA laboratory method 9081.
• Certification by a soils testing laboratory that imported soil meets the organic content and
CEC criteria above shall be provided to the City of Auburn.
• Animal manures used in treatment soil layers must be sterilized because of potential for
bacterial contamination of the groundwater.
3.4.3 Design Criteria for Low Permeability Liner Options
This section presents the design criteria for each of the following four low permeability liner options:
compacted till liners, clay liners, geomembrane liners, and concrete liners.
3.4.3.1 Compacted Till Liners
• Liner thickness shall be 18 inches after compaction.
• Soil shall be compacted to 95% minimum dry density, modified proctor method (ASTM
D-1557).
• A different depth and density sufficient to retard the infiltration rate to 2.4 x 10-5 inches per
minute (1 x 10-6 cm/s) may also be used instead of the above criteria.
• Soil shall be placed in 6-inch lifts.
• Reference Table V-3-6 for Acceptable Gradation for Compacted Till Liners.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 623
Table V-3-6. Acceptable Gradation for Compacted Till Liners
Sieve Size Percent Passing
6-inch 100
4-inch 90
#4 70 - 100
#200 20
3.4.3.2 Clay Liners
• Liner thickness shall be 12 inches.
• Clay shall be compacted to 95% minimum dry density, modified proctor method
(ASTM D-1557).
• A different depth and density sufficient to retard the infiltration rate to 2.4 x
10-5 inches per minute (1 x 10-6 cm/s) may also be used instead of the above criteria.
• The slope of clay liners must be restricted to 3H: IV for all areas requiring soil cover;
otherwise, the soil layer must be stabilized by another method so that soil slippage
into the facility does not occur. Any alternative soil stabilization method must take
maintenance access into consideration.
• Where clay liners form the sides of ponds, the interior side slope shall not be steeper
than 3H:1V, irrespective of fencing.
3.4.3.3 Geomembrane Liners
• Geomembrane liners shall be ultraviolet (UV) light resistant and have a minimum
thickness of 30 mils. A thickness of 40 mils shall be used in areas of maintenance
access or where heavy machinery must be operated over the membrane.
• Geomembranes shall be bedded according to the manufacturer's recommendations.
• Liners shall be installed so that they can be covered with 12 inches of top dressing
forming the bottom and sides of the water quality facility, except for liner sand filters.
Top dressing shall consist of 6 inches of crushed rock covered with 6 inches of
native soil. The rock layer is to mark the location of the liner for future maintenance
operations. As an alternative to crushed rock, 12 inches of native soil may be used if
orange plastic “safety fencing” or another highly-visible, continuous marker is
embedded 6 inches above the membrane.
• If possible, liners should be of a contrasting color so that maintenance workers are
aware of any areas where a liner may have become exposed when maintaining the
facility.
• Geomembrane liners shall not be used on slopes steeper than 5H:1V to prevent the
top dressing material from slipping. Textured liners may be used on slopes up to
3H:1V upon recommendation by a geotechnical engineer that the top dressing will be
stable for all site conditions, including maintenance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 624
3.4.3.4 Concrete Liners
• Portland cement liners are allowed irrespective of facility size, and shotcrete may be
used on slopes. However, specifications must be developed by a professional
engineer who certifies the liner against cracking or losing water retention ability
under expected conditions of operation, including facility maintenance operations.
Weight of maintenance equipment can be up to 80,000 pounds when fully loaded.
• Asphalt concrete may not be used for liners due to its permeability to many organic
pollutants.
• If grass is to be grown over a concrete liner, slopes must be no steeper than 5H:1V
to prevent the top dressing material from slipping.
3.5 Hydraulic Structures
3.5.1 Flow Splitter Designs
3.5.1.1 General Design Criteria
• A flow splitter must be designed to deliver the WQ design flow rate specified in this
volume to the WQ treatment facility.
• The top of the weir must be located at the water surface for the design flow.
Remaining flows enter the bypass line. Flows modeled using a WWHM shall use
15-minute time steps, if available. Otherwise use 1-hour time steps.
• The maximum head must be minimized for flow in excess of the WQ design flow.
Specifically, flow to the WQ facility at the 100-year water surface must not increase
the design WQ flow by more than 10%.
• Design as shown in Figure V-3-1 or Figure V-3-2 or provide an equivalent design.
• As an alternative to using a solid top plate in Figure V-3-2, a full tee section may be
used with the top of the tee at the 100-year water surface. This alternative would
route emergency overflows (if the overflow pipe were plugged) through the WQ
facility rather than back up from the manhole.
• Special applications, such as roads, may require the use of a modified flow splitter.
The baffle wall may be fitted with a notch and adjustable weir plate to proportion
runoff volumes other than high flows.
• For ponding facilities, backwater effects must be considered in determining the
height of the standpipe in the manhole.
• Ladder or step and handhold access must be provided. If the weir wall is higher than
36 inches, two ladders, one to either side of the wall, must be used.
3.5.1.2 Materials
• The splitter baffle may be installed in a Type 2 manhole or vault.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 625
• The baffle wall must be made of reinforced concrete or another suitable material
resistant to corrosion, and have a minimum 4-inch thickness. The minimum
clearance between the top of the baffle wall and the bottom of the manhole cover
must be 4 feet; otherwise, dual access points shall be provided.
• All metal parts must be corrosion resistant. Examples of preferred materials include
aluminum, stainless steel, and plastic. Zinc and galvanized materials are prohibited
unless coated as approved by the City. Painted metal parts shall not be used
because of poor longevity.
Figure V-3-1. Flow Splitter, Option A
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 626
Figure V-3-2. Flow Splitter, Option B
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 627
3.5.2 Flow Spreading Options
Flow spreaders function to uniformly spread flows across the inflow portion of water quality facilities
(e.g., sand filter, biofiltration swale, or filter strip). There are five flow spreader options presented in
this section:
• Option A – Anchored plate (Figure V-3-3)
• Option B – Concrete sump box (Figure V-3-4)
• Option C – Notched curb spreader (Figure V-3-5)
• Option D – Through-curb ports (Figure V-3-6)
• Option E – Interrupted curb
Options A through C can be used for spreading flows that are concentrated. Any one of these options
can be used when spreading is required by the facility design criteria. Options A through C can also
be used for unconcentrated flows, and in some cases must be used, such as to correct for moderate
grade changes along a filter strip.
Options D and E are only for flows that are already unconcentrated and enter a filter strip or
continuous inflow biofiltration swale. Other flow spreader options may be allowed with written
approval from The City.
3.5.2.1 General Design Criteria
• Where flow enters the flow spreader through a pipe, it is recommended that the pipe
be submerged to the extent practical to dissipate as much energy as possible.
• For higher inflows (greater than 5 cfs for the 100-yr storm), a Type 1 catch basin
shall be positioned in the spreader and the inflow pipe shall enter the catch basin
with flows exiting through the top grate. The top of the grate shall be lower than the
level spreader plate, or if a notched spreader is used, lower than the bottom of the
v-notches.
Option A -- Anchored Plate
• An anchored plate flow spreader must be preceded by a sump having a minimum
depth of 8 inches and minimum width of 24 inches. If not otherwise stabilized, the
sump area must be lined to reduce erosion and to provide energy dissipation.
• The top surface of the flow spreader plate must be level, projecting a minimum of
2 inches above the ground surface of the water quality facility, or V-notched with
notches 6 to 10 inches on center and 1 to 6 inches deep (use shallower notches with
closer spacing). Alternative designs may also be used if approved by the City.
• A flow spreader plate must extend horizontally beyond the bottom width of the facility
to prevent water from eroding the side slope. The horizontal extent shall be such that
the bank is protected for all flows up to the 100-year flow or the maximum flow that
will enter the Water Quality (WQ) facility.
• Flow spreader plates must be securely fixed in place.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 628
• Flow spreader plates may be made of either wood, metal, fiberglass reinforced
plastic, or other durable material. If wood, pressure treated 4 by 10-inch lumber or
landscape timbers are acceptable.
• Anchor posts must be 4-inch square concrete, tubular stainless steel, or other
material resistant to decay.
Figure V-3-3. Flow Spreader Option A – Anchored Plate
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 629
Option B -- Concrete Sump Box
• The wall of the downstream side of a rectangular concrete sump box must extend a
minimum of 2 inches above the treatment bed. This serves as a weir to spread the
flows uniformly across the bed.
• The downstream wall of a sump box must have “wing walls” at both ends. Side walls
and returns must be slightly higher than the weir so that erosion of the side slope is
minimized.
• Concrete for a sump box can be either cast-in-place or precast, but the bottom of the
sump must be reinforced with wire mesh for cast-in-place sumps.
• Sump boxes must be placed over bases that consists of 4 inches of crushed rock,
5/8-inch minus to help assure the sump remains level.
Figure V-3-4. Flow Spreader Option B – Concrete Sump Box
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 630
Option C -- Notched Curb Spreader
Notched curb spreader sections must be made of extruded concrete laid side-by-side and level.
Typically five “teeth” per four-foot section provide good spacing. The space between adjacent “teeth”
forms a v-notch.
Figure V-3-5. Flow Spreader Option C – Notched Curb Spreader
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements for Volume V
Stormwater Facilities Chapter 3 631
Option D -- Through-Curb Ports (Figure V-3-6)
Unconcentrated flows from paved areas entering filter strips or continuous inflow biofiltration swales
can use curb ports or interrupted curbs (Option E) to allow flows to enter the strip or swale. Curb
ports use fabricated openings that allow concrete curbing to be poured or extruded while still
providing an opening through the curb to admit water to the water quality facility.
Openings in the curb must be at regular intervals but at least every 6 feet (minimum). The width of
each curb port opening must be a minimum of 11 inches. Approximately 15 percent or more of the
curb section length shall be in open ports, and no port shall discharge more than about 10 percent of
the flow.
Figure V-3-6. Flow Spreader Option D – Through-Curb Ports
Option E -- Interrupted Curb
Interrupted curbs are sections of curb placed to have gaps spaced at regular intervals along the total
width (or length, depending on facility) of the treatment area. At a minimum, gaps must be every
6 feet to allow distribution of flows into the treatment facility before they become too concentrated.
The opening must be a minimum of 11 inches. As a general rule, no opening shall discharge more
than 10 percent of the overall flow entering the facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Pretreatment Volume V
Chapter 4 632
Chapter 4 Pretreatment
4.1 Purpose
This chapter presents the methods that may be used to provide pretreatment prior to runoff treatment
facilities. Pretreatment must be provided in the following applications:
• For sand filtration and infiltration Best Management Practices (BMPs) to protect them
from excessive siltation and debris;
• Where the basic treatment facility or the receiving water may be adversely affected
by non-targeted pollutants (e.g., oil), or may be overwhelmed by a heavy load of
targeted pollutants (e.g., suspended solids).
4.2 Application
Presettling basins are a typical pretreatment BMP used to remove suspended solids. All basic,
enhanced, and phosphorus treatment options may be used for pretreatment to reduce suspended
solids.
A detention pond sized to meet the flow control standard in Volume I may also be used to provide
pretreatment for suspended solids removal.
4.3 BMPs for Pretreatment
4.3.1 BMP T610 Presettling Basin
4.3.1.1 Purpose and Definition
A presettling basin provides pretreatment of runoff in order to remove suspended solids, which can
impact other runoff treatment BMPs.
4.3.1.2 Application and Limitations
Runoff treated by a presettling basin may not be discharged directly to a receiving water; it must be
further treated by a basic, enhanced, or phosphorus runoff treatment BMP.
4.3.1.3 Design Criteria
1. A presettling basin shall be designed using analysis techniques for a wetpool or using
WWHM. The treatment volume shall be at least 30 percent of the total volume of runoff
from the 6-month, 24-hour storm event.
2. If the runoff in the presettling basin will be in direct contact with the soil, it must be lined
per the liner requirement in Section 3.4.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Pretreatment Volume V
Chapter 4 633
3. The presettling basin shall conform to the following:
o The length-to-width ratio shall be at least 3:1. Berms or baffles may be used
to lengthen the flowpath.
o The minimum depth shall be 4 feet; the maximum depth shall be 6 feet.
4. Inlets and outlets shall be designed to minimize velocity and reduce turbulence.
Inlet and outlet structures should be located at extreme ends of the basin in order
to maximize particle-settling opportunities.
4.3.1.4 Site Constraints and Setback Requirements
Site constraints are any manmade restrictions such as property lines, easements, structures, etc. that
impose constraints on development. Constraints may also be imposed from natural features such as
requirements in the Auburn City Code. These should also be reviewed for specific application to the
proposed development. For Setback Requirements see Section 3.3.1.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 634
Chapter 5 Infiltration and Bio-infiltration Treatment Facilities
5.1 Purpose
This chapter provides site suitability, design, and maintenance criteria for infiltration treatment
systems. Infiltration treatment Best Management Practices (BMPs) serve the dual purpose of
removing pollutants (TSS, heavy metals, phosphates, and organics) from stormwater and recharging
aquifers.
The infiltration BMPs described in this chapter include:
BMP T710 Infiltration basins
BMP T720 Infiltration trenches
BMP T730 Bio-infiltration swales
5.2 Application
These infiltration and bio-infiltration treatment measures are capable of achieving the performance
objectives cited in Chapter 3 for specific treatment menus. In general, these treatment techniques
can capture and remove or reduce the target pollutants to levels that will not adversely affect public
health or beneficial uses of surface and groundwater resources.
Infiltration treatment systems are typically installed:
• As off-line systems, or on-line for small drainages.
• As a polishing treatment for street/highway runoff after pretreatment for TSS and oil.
• As part of a treatment train.
• As retrofits at sites with limited land areas, such as residential lots, commercial
areas, parking lots, and open space areas.
• With appropriate pretreatment for oil and silt control to prevent clogging.
An infiltration basin is preferred, where applicable, and where a trench or bio-infiltration swale cannot
be sufficiently maintained.
5.3 Site Suitability
The following site suitability criteria (SSC) must be considered. When a site investigation reveals that
any of the eight applicable criteria cannot be met, appropriate mitigation measures must be
implemented so that the infiltration facility will not pose a threat to safety, health, and the
environment.
For site selection and design decisions a geotechnical and hydrogeologic report must be prepared by
a qualified engineer with geotechnical and hydrogeologic experience, or an equivalent professional
acceptable to the City, under the seal of a registered Professional Engineer. The design engineer
may utilize a team of certified or registered professionals in soil science, hydrogeology, geology, and
other related fields.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 635
5.3.1 Setback Criteria (SSC-1)
Setback requirements are generally required by the City, uniform building code requirements, or
other state regulations. Where a conflict between setbacks occurs, the City shall require compliance
with the most stringent of the setback requirements from the various codes/regulations.
Setback criteria for the various infiltration and dispersion facilities can be found in the design criteria
for each BMP in this chapter. Below are conditions that the soils professional must evaluate to
determine the need for additional or more stringent setbacks than outlined in this manual.
The professional must evaluate:
• Potential impacts to drinking water wells, septic tanks or drainfields, and springs
used for public drinking water supplies. Minimum setback will be 100 feet. Infiltration
facilities upgradient of drinking water supplies and within 1, 5, and 10-year time of
travel zones must comply with Health Dept. requirements (Publication # 331-018).
• Potential impacts from roadways subject to deicers or herbicides which are likely to
be present in the influent to the infiltration system.
• Potential impacts to all building foundations in the vicinity of the proposed infiltration
facility. Recommend investigating all building foundations: within 100 feet upslope
and 20 feet downslope from the facility.
• Potential impacts to all property lines within 20 feet of the facility.
• Potential impacts to a Native Growth Protection Easement (NGPE); 20 feet.
• Potential impacts to the top of slopes >20% and within 50 feet.
• On-site and off-site structural stability due to extended subgrade saturation and/or
head loading of the permeable layer, including the potential impacts to downgradient
properties, especially on hills with known side-hill seeps.
5.3.2 Groundwater Protection Areas (SSC-2)
A site is not suitable if the infiltration facility will cause a violation of Ecology's Groundwater Quality
Standards (See Section 5.3.7 for verification testing guidance).
5.3.3 High Vehicle Traffic Areas (SSC-3)
An infiltration BMP may be considered for runoff from areas of industrial activity and the high vehicle
traffic areas described below. For such applications sufficient pollutant removal (including oil removal)
shall be provided upstream of the infiltration facility to ensure that groundwater quality standards will
not be violated and that the infiltration facility is not adversely affected.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 636
High Vehicle Traffic Areas are:
• Commercial or industrial sites subject to an expected average daily traffic count
(ADT) 100 vehicles/1,000 ft² gross building area (trip generation), and
• Road intersections with an ADT of 25,000 on the main roadway, or 15,000 on
any intersecting roadway.
5.3.4 Soil Infiltration Rate/Drawdown Time for Treatment (SSC-4)
5.3.4.1 Infiltration Rates: Short-term and Long-term
For treatment purposes, the short-term soil infiltration rate should be 2.4 in/hour, or less, to a depth of
2.5 times the maximum design pond water depth, or a minimum of 6 ft. below the base of the
infiltration facility. This infiltration rate is also typical for soil textures that possess sufficient physical
and chemical properties for adequate treatment, particularly for soluble pollutant removal (see
Section 5.3.6). It is comparable to the textures represented by Hydrologic Groups B and C. Long-
term infiltration rates up to 2.0 inches/hour can also be considered, if the infiltration receptor is not a
sole-source aquifer, and in the judgment of the site professional, the treatment soil has characteristics
comparable to those specified in SSC-6 to adequately control the target pollutants.
The long-term infiltration rate should be used for drawdown time and routing calculations.
5.3.4.2 Drawdown Time
Refer to Section 5.4 for infiltration rate determination. Document that the 91st percentile, 24-hour
runoff volume (as indicated by the Western Washington Hydrology Model [WWHM]) can infiltrate
through the infiltration basin surface within 48 hours. This can be calculated using a horizontal
projection of the infiltration basin mid-depth dimensions and the estimated long-term infiltration rate.
This drawdown restriction is intended to meet the following objectives:
• Restore hydraulic capacity to receive runoff from a new storm,
• Maintain infiltration rates,
• Aerate vegetation and soil to keep the vegetation healthy, and
• Enhance the biodegradation of pollutants and organics in the soil.
5.3.5 Depth to Bedrock, Water Table, or Impermeable Layer (SSC-5)
The base of all infiltration basins or trench systems shall be 5 feet above the seasonal high-water
mark, bedrock (or hardpan) or other low permeability layer. A separation down to 3 feet may be
considered if the groundwater mounding analysis, volumetric receptor capacity, and the design of the
overflow and/or bypass structures are judged by the site professional to be adequate to prevent
overtopping and meet the site suitability criteria specified in this section.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 637
5.3.6 Soil Physical and Chemical Suitability for Treatment (SSC-6)
The soil texture and design infiltration rates should be considered along with the physical and
chemical characteristics specified below to determine if the soil is adequate for removing the target
pollutants. The following soil properties must be carefully considered in making such a determination:
• Cation exchange capacity (CEC) of the treatment soil must be 5 milliequivalents
CEC/100 g dry soil (USEPA Method 9081). Consider empirical testing of soil sorption
capacity, if practicable. Ensure that soil CEC is sufficient for expected pollutant
loadings, particularly heavy metals. CEC values of >5 meq/100g are expected in
loamy sands, according to Rawls, et al. Lower CEC content may be considered if it is
based on a soil loading capacity determination for the target pollutants that is
accepted by the City.
• Depth of soil used for infiltration treatment must be a minimum of 18 inches.
• Organic Content of the treatment soil (ASTM D 2974): Organic matter can increase
the sorptive capacity of the soil for some pollutants. The site professional should
evaluate whether the organic matter content is sufficient for control of the target
pollutant(s).
• Waste fill materials should not be used as infiltration soil media nor should such
media be placed over uncontrolled or non-engineered fill soils.
Engineered soils may be used to meet the design criteria in this chapter and the performance goals
in Chapter 2 and Chapter 3. Field performance evaluation(s), using acceptable protocols, would be
needed to determine feasibility and acceptability by the City of Auburn.
5.3.7 Seepage Analysis and Control (SSC-7)
Determine whether there would be any adverse effects caused by seepage zones on nearby building
foundations, basements, roads, parking lots or sloping sites.
5.3.8 Cold Climate and Impact of Roadway Deicers (SSC-8)
For cold climate design criteria (snowmelt/ice impacts) refer to D. Caraco and R. Claytor, “Design
Supplement for Stormwater BMPs in Cold Climates”, Center for Watershed Protection, 1997.
Potential impact of roadway deicers on potable water wells must be considered in the siting
determination. Mitigation measures must be implemented if infiltration of roadway deicers can cause
a violation of groundwater quality standards.
5.3.9 Verification Testing of the Completed Facility
Verification testing of the completed full-scale infiltration facility is recommended to confirm that the
design infiltration parameters are adequate. The site professional should determine the duration and
frequency of the verification testing program including the monitoring program for the potentially
impacted groundwater. The groundwater monitoring wells installed during site characterization
(see 5.4) may be used for this purpose. Long-term (more than two years) in-situ drawdown and
confirmatory monitoring of the infiltration facility would be preferable. The City may require verification
testing on a case-by-case basis.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 638
5.4 Site Characterization
Use the following guidelines to determine if the site suitability criteria have been met.
5.4.1 Field Methods used to Determine Subsurface Characterization
5.4.1.1 Test Holes or Pits
• Dig test holes or pits to a depth below the base of the infiltration facility of at least
5 times the maximum design depth of ponded water proposed for the infiltration
facility,
• Conduct pit/hole exploration during the wet season (December 1st through April 30th)
to provide accurate groundwater saturation and groundwater information.
• Take soil samples (representative samples from each soil type and/or unit within the
infiltration receptor) to a depth below the base of the infiltration facility of 2.5 times
the maximum design ponded water depth, but not less than 6 feet.
o For basins, at least one test pit or test hole per 5,000 ft2 of basin infiltrating
surface (in no case less than two per basin) is required.
o For trenches, at least one test pit or test hole per 50 feet of trench length (in
no case less than two per trench) is required.
The depth and number of test holes or test pits and samples should be increased if, in the judgment
of a licensed engineer with geotechnical expertise (P.E.) or other licensed professional acceptable to
the City, the conditions are highly variable and such increases are necessary to accurately estimate
the performance of the infiltration system. The exploration program may also be decreased if, in the
opinion of the licensed engineer or other professional, the conditions are relatively uniform and the
borings/test pits omitted will not influence the design or successful operation of the facility. In high
water table sites the subsurface exploration sampling need not be conducted lower than two (2) feet
below the groundwater table.
• Prepare detailed logs for each test pit or test hole and a map showing the location of
the test pits or test holes. Logs must include at a minimum, depth of pit or hole, soil
descriptions, depth to water, presence of stratification.
At a minimum, soil characterization for each soil unit (soils of the same texture, color, density,
compaction, consolidation and permeability) encountered shall include:
o Grain-size distribution (ASTM D422 or equivalent AASHTO specification).
o Textural class (USDA) (see Volume III, Figure III-2-5).
o Percent clay content (include type of clay, if known).
o Cation exchange capacity (CEC) and organic matter content for each soil
type and strata. Where distinct changes in soil properties occur, to a depth
below the base of the facility of at least 2.5 times the maximum design water
depth, but not less than 6 feet. Consider if soils are already contaminated,
thus diminishing pollutant sorptive capacity (for water quality design only).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 639
o For soils with low CEC and organic content, deeper characterization of soils
may be warranted.
o Color/mottling.
o Variations and nature of stratification.
5.4.1.2 Infiltration Rate Determination
Determine the representative infiltration rate of the unsaturated vadose zone based on field infiltration
tests and/or grain size/texture determinations. Field infiltration rates can be determined using the Pilot
Infiltration Test (see PIT-Appendix B). Such site testing should be considered to verify infiltration rate
estimates based on soil size distribution and/or texture. Infiltration rates may also be estimated based
on soil grain-size distributions from test pits or test hole samples. This may be particularly useful
where a sufficient source of water does not exist to conduct a pilot infiltration test. As a minimum, one
soil grain-size analysis per soil stratum in each test hole shall be performed within 2.5 times the
maximum design water depth, but not less than 6 feet.
The infiltration rate is needed for routing and sizing purposes and for classifying the soil for treatment
adequacy.
5.4.1.3 Infiltration Receptor
Infiltration receptor (unsaturated and saturated soil receiving the storm water) characterization should
include:
• Installation of groundwater monitoring wells. Use at least three per infiltration facility,
or three hydraulically connected surface and groundwater features. This will
establish a three-dimensional relationship for the groundwater table, unless the
highest groundwater level is known to be at least 50 feet below the proposed
infiltration facility. The monitoring wells will:
o Monitor the seasonal groundwater levels at the site during at least one wet
season, and,
o Consider the potential for both unconfined and confined aquifers, or confining
units, at the site that may influence the proposed infiltration facility as well as
the groundwater gradient. Other approaches to determine groundwater levels
at the proposed site could be considered if pre-approved by the City, and,
o Determine the ambient groundwater quality, if that is a concern.
• An estimate of the volumetric water holding capacity of the infiltration receptor soil.
This is the soil layer below the infiltration facility and above the seasonal high-water
mark, bedrock, hardpan, or other low permeability layer. This analysis should be
conducted at a conservatively high infiltration rate based on vadose zone porosity,
and the water quality runoff volume to be infiltrated. This, along with an analysis of
groundwater movement, will be useful in determining if there are volumetric
limitations that would adversely affect drawdown.
• Depth to groundwater table and to bedrock/impermeable layers.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 640
• Seasonal variation of groundwater table based on well water levels and observed
mottling.
• Existing groundwater flow direction and gradient.
• Lateral extent of infiltration receptor.
• Horizontal hydraulic conductivity of the saturated zone to assess the aquifer’s ability
to laterally transport the infiltrated water.
• Impact of the infiltration rate and volume at the project site on groundwater
mounding, flow direction, and water table; and the discharge point or area of the
infiltrating water. A groundwater mounding analysis shall be conducted at all sites
where the depth to seasonal groundwater table or low permeability stratum is less
than 15 feet and the runoff to the infiltration facility is from more than one acre. The
site professional can consider conducting an aquifer test, or slug test and the type of
groundwater mounding analysis necessary at the site.
5.4.2 Design Infiltration Rate Determination
Infiltration rates for treatment can be determined using either a correlation to grain size distribution
from soil samples, textural analysis, or by in-situ field measurements.
Infiltration rate design information shall be prepared and sealed by a licensed engineer or licensed
geologist and submitted to the City along with the Stormwater Site Plan.
5.4.2.1 Three Methods for Determining Long-term Infiltration Rate for Sizing the
Infiltration Basin, Trench, or Swale
For designing the infiltration facility, the site professional should select one of the three methods
described below that will best represent the long-term infiltration rate at the site. The long-term
infiltration rate should be used for routing and sizing the basin/trench for the maximum drawdown
time of 24 hours. Verification testing of the completed facility is strongly encouraged using the criteria
described in Section 5.3.9.
Method 1 — USDA Soil Textural Classification
The infiltration rates provided in Volume III, Table III-2-7 represents rates for homogeneous soil
conditions. If more than one soil unit is encountered within 6 feet of the base of the facility, or
2.5 times the proposed maximum water design depth, use the lowest infiltration rate determined from
each of the soil units as the representative site infiltration rate.
• Use Volume III, Figure III-2-5 (USDA Textural Triangle) to determine the soil textural
classification. Only soils passing the #10 sieve may be used to determine the
percentages of sand, silt, and clay.
• More information on the USDA textural classification can be found in the Soils
Survey Manual (U.S. Department of Agriculture, October 1993).
• Use the textural classification obtained from Volume III, Figure III-2-5 and Volume III,
Table III-2-7 to determine the short and long-term infiltration rates. Treatment site
suitability criteria (Section 5.3.4) must be met.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 641
• Consider alternate correction factors if site conditions warrant. Alternate correction
factors require City approval.
In no case shall a correction factor less than 2.0 be used.
Correction factors higher than those provided in Volume III, Table III-2-7 should be
considered for situations where: long-term maintenance will be difficult to implement; where
little or no pretreatment is anticipated, where site conditions are highly variable or uncertain,
or where soil mottling exists that cannot be fully represented in the soil gradation tests. These
situations require the use of best professional judgment by the site engineer and the approval
of the City. An operation and maintenance plan and a financial bonding plan may also be
required by the City.
Use Method 2 if the soil gradation was determined using ASTM D422.
Method 2 — ASTM Gradation Testing at Full Scale Infiltration Facilities
This method may not be used for soils with a d10 size less than 0.05 mm (U.S. Standard Sieve).
The infiltration rates provided in Volume III, Table III-2-8 represent rates for homogeneous soil
conditions. If more than one soil unit is encountered within 6 feet of the base of the facility, or
2.5 times the proposed maximum water design depth, use the lowest infiltration rate determined from
each of the soil units as the representative site infiltration rate.
1. Determine the long-term infiltration rate using the d10 value obtained from ASTM D422
and Volume III, Table III-2-8.
2. Consider alternate correction factors if site conditions warrant. Alternate correction
factors require City approval.
3. Correction factors higher than those provided in Volume III, Table III-2-7 should be
considered for situations where: long-term maintenance will be difficult to implement;
where little or no pretreatment is anticipated, where site conditions are highly variable or
uncertain, or where soil mottling exists that cannot be fully represented in the soil
gradation tests. These situations require the use of best professional judgment by the
site engineer and the approval of the City. An operation and maintenance plan and a
financial bonding plan may also be required by the City.
Method 3 - In-situ Infiltration Measurements or Pilot Infiltration Tests (PIT)
Where feasible, use in-situ infiltration measurements. Use a procedure such as the Pilot Infiltration
Test (PIT) described in Appendix B.
As with the previous methods, the infiltration rate obtained from the PIT shall be considered to be a
short-term rate. To obtain long-term infiltration rates the short-term rates must be reduced by applying
a total correction factor. The total correction factor is the sum of the partial correction factors,
presented in Table V-B-17 (Appendix B), which account for site variability, number of tests
conducted, degree of long-term maintenance, influent pretreatment/control, and potential for long-
term clogging due to siltation and bio-buildup.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 642
The range of partial correction factors is for general guidance only. The specific partial correction
factors used shall be determined based on the professional judgment of the licensed engineer or
other site professional considering all issues which may affect the long-term infiltration rate, subject to
the approval of the City.
Use the following guidance to determine the partial correction factors to apply from Table V-B-17
(Appendix B).
• Site variability and number of locations tested. The number of locations tested must
represent the subsurface conditions throughout the facility site. If the range of
uncertainty is low (for example, conditions are known to be uniform through previous
exploration and site geological factors), one pilot infiltration test may be adequate to
justify a partial correction factor at the low end of the range. If the level of uncertainty
is high, due to highly variable site conditions or limited local testing data, a partial
correction factor near the high end of the range may be appropriate. This might be
the case where the site conditions are highly variable due to a deposit of ancient
landslide debris, or buried stream channels. In these cases, even with many
explorations and several pilot infiltration tests, the level of uncertainty may still be
high.
• Degree of long-term maintenance to prevent siltation and bio-buildup. The standard
of comparison here is the long-term maintenance requirements provided in Volume I,
Appendix D and any additional requirements by the City. Full compliance with these
requirements would be justification to use a partial correction factor at the low end of
the range. If there is a high degree of uncertainty that long-term maintenance will be
carried out consistently, or if the maintenance plan is poorly defined, a partial
correction factor near the high end of the range may be justified.
• Degree of influent control to prevent siltation and bio-buildup. A partial correction
factor near the high end of the range may be justified under the following
circumstances:
o If the infiltration facility is located in a shady area where moss or litter fall,
buildup from the surrounding vegetation is likely and cannot be easily
controlled through long-term maintenance.
o If there is minimal pretreatment, and the influent is likely to contain
moderately-high TSS levels.
The determination of long-term design infiltration rates from in-situ infiltration test data involves a
considerable amount of engineering judgment. Therefore, when reviewing or determining the final
long-term design infiltration rate, the City may consider the results of both textural analyses and in-
situ infiltration tests results when available.
5.4.2.2 General Sizing Criteria
This information is applicable to infiltration basins, trenches, and bio-infiltration facilities.
Size the device by routing 91% of the runoff volume, as predicted by the WWHM through the facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 643
Infiltration facilities for treatment can be located upstream or downstream of detention and can be off-
line or on-line.
• On-line treatment facilities placed upstream or downstream of a detention facility
must be sized to infiltrate 91% of the runoff file volume directed to it.
• Off-line treatment facilities placed upstream of a detention facility must have a flow
splitter designed to send all flows at or below the 15-minute water quality flow rate,
as predicted by WWHM, to the treatment facility. The treatment facility must be sized
to infiltrate all the runoff sent to it (no overflows from the treatment facility are
allowed).
• Off-line treatment facilities placed downstream of a detention facility must have a
flow splitter designed to send all flows at or below the 2-year flow frequency from the
detention pond, as predicted by WWHM, to the treatment facility. The treatment
facility must be sized to infiltrate all the runoff sent to it (no overflows from the
treatment facility are allowed).
5.4.2.3 General Design Criteria
• Slope of the base of the infiltration facility should be < 3 percent.
• Spillways/overflow structures – A non-erodible outlet or spillway with a firmly
established elevation must be constructed to discharge overflow. Ponding depth,
drawdown time, and storage volume are calculated from that reference point. Refer to
Volume III, Section 2.3 for overflow structure design details.
• For infiltration treatment facilities, side-wall seepage is not a concern if seepage occurs
through the same stratum as the bottom of the facility. However, for engineered soils
or for soils with very low permeability, the potential to bypass the treatment soil
through the side-walls may be significant. In those cases, the side-walls must be lined,
either with an impervious liner or with at least 18 inches of treatment soil, to prevent
seepage of untreated flows through the side walls.
5.4.2.4 General Construction Criteria
• Initially excavate to within 1-foot of the final floor elevation of the infiltration facility. Do
not excavate to the final grade until all disturbed areas in the upgradient watershed
have been stabilized or protected. Remove all accumulated sediment in the final phase
of excavation.
• Post-construction, all water must be conveyed through a pretreatment device to
prevent sedimentation.
• Infiltration facilities should not be used as temporary sediment traps during
construction.
• Use light-tracked equipment for excavation to avoid compaction of the floor of the
infiltration facility. The use of draglines and trackhoes should be considered. The
infiltration area should be flagged or marked to keep equipment away.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 644
5.4.2.5 Maintenance Criteria
• Make provision for regular and perpetual maintenance of the infiltration basin/trench,
including replacement and/or reconstruction of the treatment infiltration medium.
• Include access for operation and maintenance in system design.
• Include an operation and maintenance plan. The plan must be approved by the City.
• Remove accumulated debris/sediment every 6 months or as needed to prevent
clogging, or when water remains in the pond for greater than 24 hours.
• Replace or amend the treatment soil as needed to ensure maintaining adequate
treatment capacity.
5.4.2.6 Verification of Performance
During the first 1 to 2 years of operation, verification testing as specified in Section 5.3.9 is strongly
recommended, along with a maintenance program that achieves expected performance levels.
Operating and maintaining groundwater monitoring wells is also strongly encouraged.
In order to determine compliance with the flow control requirements, the WWHM must be used.
5.5 BMPs for Infiltration and Bio-infiltration Treatment
The three BMPs discussed below are recognized currently as effective treatment techniques using
infiltration and bio-infiltration. Selection of a specific BMP should be based on the Treatment Facility
Menus provided in Chapter 2.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 645
5.5.1 BMP T710 Infiltration Basins
5.5.1.1 Description
Infiltration basins are earthen impoundments used for the collection, temporary storage and
infiltration of incoming stormwater runoff.
5.5.1.2 Design Criteria Specific for Basins
• Complete a site suitability analysis per Section 5.3.
• Provide access for vehicles to easily maintain the forebay (presettling basin) area
and not disturb vegetation, or resuspend sediment any more than is absolutely
necessary.
• The slope of the basin bottom should not exceed 3% in any direction.
• Provide a minimum of one foot of freeboard when establishing the design ponded
water depth. Freeboard is measured from the rim of the infiltration facility to the
maximum ponding level or from the rim down to the overflow point if overflow or a
spillway is included.
• Establish vegetation on the basin floor and side slopes to prevent erosion and
sloughing and to provide additional pollutant removal. Provide erosion protection
of inflow points to the basin (e.g., riprap, flow spreaders, energy dissipators (See
Chapter 3). Refer to Chapter 7 for recommended vegetation.
• Lining material – Basins can be open or covered with a 6 to 12-inch layer of filter
material such as coarse sand, or a suitable filter fabric to help prevent the buildup
of impervious deposits on the soil surface. A nonwoven geotextile should be
selected that will function sufficiently without plugging (see geotextile
specifications in Appendix C). The filter layer shall be replaced or cleaned when/if
it becomes clogged.
• Stabilize and plant embankment, emergency spillways, spoil and borrow areas,
and other disturbed areas. Without healthy vegetation the surface soil pores
would quickly plug.
5.5.1.3 Maintenance Criteria for Basins
• Maintain basin floor and side slopes to promote dense turf with extensive root
growth. This enhances infiltration, prevents erosion and consequent sedimentation of
the basin floor, and prevents invasive weed growth. Immediately stabilize and
revegetate any bare spots.
• Vegetation growth should not be allowed to exceed 18 inches in height. Mow the
slopes periodically and check for clogging, and erosion. Remove clippings from
mowing, weeding and pruning operations.
• Seed mixtures should be the same as those recommended in Table V-7-12. The use
of slow-growing, stoloniferous grasses will permit long intervals between mowing.
Mowing twice a year is generally satisfactory. Fertilizers are not allowed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 646
5.5.2 BMP T720 Infiltration Trenches
5.5.2.1 Description
Infiltration trenches are generally at least 24 inches wide, and are backfilled with a coarse stone
aggregate, allowing for temporary storage of stormwater runoff in the voids of the aggregate material.
Stored runoff gradually infiltrates into the surrounding soil. The surface of the trench can be covered
with grating and/or consist of stone, gabion, sand, or a grassed covered area with a surface inlet.
Perforated rigid pipe of at least 8-inch diameter can also be used to distribute the stormwater in a
stone trench.
5.5.2.2 Design Criteria
• Complete a site suitability analysis per Section 5.3.
• Include an access port or open or grated top for accessibility to conduct inspections
and maintenance.
• Use clean aggregate with a maximum diameter of 3 inches and a minimum diameter
of 1.5 inches to fill trench. Void space for these aggregates should be in the range of
30 to 40 percent.
• Line sides of trench with an engineered geotextile material. Geotextile should
surround all of the aggregate fill material except for the top one-foot, which is placed
over the geotextile. Geotextile fabric with acceptable properties must be carefully
selected to avoid plugging (see Appendix C).
• The bottom sand or geotextile fabric is optional.
• Overflow Channel - Because an infiltration trench is generally used for small
drainage areas, an emergency spillway is not necessary. However, a non-erosive
overflow channel leading to a stabilized watercourse should be provided.
• Trench can be placed under a porous or impervious surface cover to conserve
space.
• Install an observation well at the lower end of the infiltration trench to check water
levels, drawdown time, sediment accumulation, and conduct water quality
monitoring. Figure V-5-7 illustrates observation well details. It should consist of a
perforated PVC pipe which is 4 to 6 inches in diameter and it should be constructed
flush with the ground elevation. For larger trenches a 12-36 inch diameter well can
be installed to facilitate maintenance operations such as pumping out the sediment.
Cap the top of the well to discourage vandalism and tampering.
5.5.2.3 Construction Criteria
• Trench Preparation –Place excavated materials away from the trench sides to
enhance trench wall stability. Keep excavated material away from slopes,
neighboring property, sidewalks and streets.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 647
• Stone Aggregate Placement and Compaction – Place the stone aggregate in lifts
and compact using plate compactors. As a rule of thumb, a maximum loose lift
thickness of 12 inches is recommended. The compaction process ensures geotextile
conformity to the excavation sides, thereby reducing potential piping and geotextile
clogging, and settlement problems.
• Potential Contamination - Prevent natural or fill soils from intermixing with the
stone aggregate. Remove all contaminated stone aggregate and replace with
uncontaminated stone aggregate.
• Overlapping and Covering - Following the stone aggregate placement, fold the
geotextile over the stone aggregate to form a 12-inch-minimum longitudinal overlap.
When overlaps are required between rolls, overlap the upstream roll a minimum of
2 feet over the downstream roll in order to provide a shingled effect.
• Voids behind Geotextile – Avoid voids between the geotextile and excavation
sides. Remove boulders or other obstacles from the trench walls. Place natural soils
in voids at the most convenient time during construction to ensure geotextile
conformity to the excavation sides. Soil piping, geotextile clogging, and possible
surface subsidence will be avoided by this remedial process.
• Unstable Excavation Sites - Vertically excavated walls may be difficult to maintain
in areas where the soil moisture is high or where soft or cohesionless soils
predominate. Trapezoidal, rather than rectangular, cross-sections may be needed.
5.5.2.4 Maintenance Criteria
• Monitor sediment buildup in the top foot of stone aggregate or the surface inlet.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 648
5.5.3 BMP T730 Bio-infiltration Swale
5.5.3.1 Description
Bio-infiltration swales, also known as Grass Percolation Areas, combine grassy vegetation and soils
to remove stormwater pollutants by percolation into the ground. Their pollutant removal mechanisms
include filtration, soil sorption, and uptake by vegetative root zones.
In general, bio-infiltration swales are used for treating stormwater runoff from roofs, roads and parking
lots. Runoff volumes greater than water quality design volume are typically overflowed to the
subsurface through an appropriate conveyance facility such as a dry well, or an overflow channel to
surface water. Overflows that are directed to a surface water must meet Minimum Requirement #7 or
#8 (whichever is applicable). If applicable, see Volume I, Chapter 2.
5.5.3.2 Additional Design Criteria Specific for Bio-infiltration Swales
• Complete a site suitability analysis per Section 5.3.
• Swale bottom: flat with a longitudinal slope less than 1%.
• Maximum ponded level: 6 inches.
• The design soil thickness may be reduced to as low as 6 inches if appropriate
performance data demonstrates that the vegetated root zone and the natural soil can
be expected to provide adequate removal and loading capacities for the target
pollutants. The design professional should calculate the pollutant loading capacity of
the treatment soil to estimate if there is sufficient treatment soil volume for an
acceptable design period.
• Other combinations of treatment soil thickness, CEC, and organic content design
factors can be considered if it is demonstrated that the soil and vegetation will
provide a target pollutant loading capacity and performance level acceptable.
• The treatment zone depth must contain sufficient organics and texture to ensure
good growth of the vegetation.
• If demonstrated that 6 inches of treatment depth is sufficient, the maximum infiltration
rate is 1 in/hr. In these cases, all other portions of the Site Suitability Criteria apply.
• Use native or adapted grass.
• Pretreat to prevent the clogging of the treatment soil and/or growth of the vegetation.
• Identify pollutants, particularly in industrial and commercial area runoff, that could
cause a violation of Ecology's Groundwater Quality Standards (Chapter 173-200
WAC). Include appropriate mitigation measures (pretreatment, source control, etc.)
for those pollutants.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Infiltration and Bio-infiltration Volume V
Treatment Facilities Chapter 5 649
Figure V-5-7. Observation Well Details
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 650
Chapter 6 Sand Filtration Treatment Facilities
6.1 Purpose
This chapter presents criteria for the design, construction and maintenance of runoff treatment sand
filters. Treatment sand filters are used to collect, treat and remove TSS, phosphorous, and insoluble
organics (including oils) from stormwater.
Sand filtration options discussed in this Chapter are:
Basic Sand Filter
Large Sand Filter
BMP T810 Sand Filter Vault
BMP T820 Linear Sand Filter
6.2 Description
A typical sand filtration system consists of a pretreatment facility, flow spreader(s), a sand bed, and
the underdrain piping. The sand filter bed includes a geotextile fabric between the sand bed and
the bottom underdrain system.
An impermeable liner under the facility may also be needed if the filtered runoff requires additional
treatment to remove soluble groundwater pollutants, or in cases where additional groundwater
protection is mandated. The variations of a sand filter include a basic or large sand filter, sand filter
with level spreader, sand filter vault, and linear sand filter. Figures V-6-8 through V-6-15 provide
examples of various sand filter configurations.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 651
Source: City of Austin, TX
Filtered Outflow (Route through detention basin)
Figure V-6-8. Sand Filtration Basin Preceded by Presettling Basin
(Variation of a Basic Sand Filter)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 652
Figure V-6-9. Sand Filter with a Pretreatment Cell (top view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 653
Figure V-6-10. Sand Filter with a Pretreatment Cell (side view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 654
Figure V-6-11. Sand Filter with Level Spreader (top view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 655
Figure V-6-12. Sand Filter with Level Spreader (side view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 656
6.3 Applications and Limitations
Sand filtration can be used in most residential, commercial, and industrial developments where
debris, heavy sediment loads, and oils and greases will not clog or prematurely overload the sand, or
where adequate pretreatment is provided for these pollutants.
Pretreatment is necessary to reduce velocities to the sand filter and remove debris, floatables, large
particulate matter, and oils. In high water table areas, adequate drainage of the sand filter may
require additional engineering analysis and design considerations. An underground filter should be
considered in areas subject to freezing conditions. (Urbonas, 1997)
6.4 Site Suitability
The following site characteristics should be considered in siting a sand filtration system:
• Space availability, including the space needed for a presettling basin.
• Sufficient hydraulic head, at least 4 feet from inlet to outlet.
• Adequate Operation and Maintenance capability including accessibility for O&M.
• Sufficient pretreatment of oil, debris and solids in the tributary runoff.
6.5 Design Criteria
6.5.1 Objective
The objective is to capture and treat 91% of the total runoff volume (95% for large sand filters) as
predicted by the Western Washington Hydrology Model (WWHM).
6.5.2 Sand Filter Sizing
Sand filter design criteria are as follows:
1. The design hydraulic conductivity shall be 1 in/hr.
2. On-line sand filters must NOT be placed upstream of a detention facility. This is to prevent
exposure of the sand filter surface to high flow rates that could cause loss of media and
previously removed pollutants.
3. On-line sand filters placed downstream of a detention facility must be sized using WWHM to
filter 91% of the runoff volume.
4. Off-line sand filters placed upstream of a detention facility must have a flow splitter designed
to send all flows at or below the 15-minute water quality flow rate, as predicted by WWHM to
the sand filter. The sand filter must be sized to filter all the runoff sent to it (no overflows from
the treatment facility should occur).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 657
5. Off-line sand filters placed downstream of a detention facility must have a flow splitter
designed to send all flows at or below the 2-year frequency peak flow as predicted by
WWHM, from the detention facility to the treatment facility. The treatment facility must be
sized to filter all the runoff sent to it (no overflows from the treatment facility should occur).
6. Include an overflow in the design. The overflow height shall be at the maximum hydraulic
head of the water above the sand bed.
7. Pretreat runoff to be treated by the sand filter (e.g., presettling basin, etc. depending on
pollutants) to remove debris and other solids, and oil from high use sites.
8. Design inlet bypass and flow spreading structures (e.g., flow spreaders, weirs or multiple
orifice openings) to capture the applicable design flow rate, minimize turbulence and to
spread the flow uniformly across the surface of the sand filter. Install stone riprap or other
energy dissipation devices to prevent gouging of the sand medium and to promote uniform
flow. Include emergency spillway or overflow structures (see Volume III).
9. Include underdrain piping in sand filter design. Types of underdrains include a central
collector pipe with lateral feeder pipes; or a geotextile drain strip in an 8-inch gravel backfill or
drain rock bed; or longitudinal pipes in an 8-inch gravel backfill or drain rock with a collector
pipe at the outlet end.
• Upstream of detention, underdrain piping shall be sized to handle double the
two-year return frequency flow indicated by the WWHM (the doubling factor is
a factor of safety). Downstream of detention the underdrain piping shall be
sized for the two-year return frequency flow indicated by the WWHM. In both
instances there shall be at least one foot of hydraulic head above the invert of
the upstream end of the collector pipe.
• Internal diameters of underdrain pipes shall be a minimum of six inches
having two rows of ½-inch holes spaced 6 inches apart longitudinally
(maximum), with rows 120 degrees apart (laid with holes downward).
Maximum perpendicular distance between two feeder pipes must be 15 feet.
All piping is to be schedule 40 PVC or greater wall thickness. Drain piping
could be installed in basin and trench configurations. Other equivalent
underdrains can be used.
• Main collector underdrain pipe shall be at a slope of 0.5 percent minimum.
• A geotextile fabric (specifications in Appendix C) must be used between the
sand layer and drain rock or gravel and placed so that 1-inch of drain
rock/gravel is above the fabric. Drain rock shall be 0.75-1.5 inch rock or
gravel backfill, washed free of clay and organic material.
10. Provide cleanout wyes with caps or junction boxes at both ends of the collector pipes. Extend
cleanouts to the surface of the filter. Provide a valve box for access to the cleanouts. Provide
access for cleaning all underdrain piping. This may consist of installing cleanout ports that tee
into the underdrain system and surface above the top of the sand bed. To facilitate
maintenance of the sand filter an inlet shutoff/bypass valve is recommended.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 658
11. Sand specification: The sand in a filter must meet the size gradation (by weight) given in
Table V-6-7. The contractor must obtain a grain size analysis from the supplier to certify that
the No. 100 and No. 200 sieve requirements are met.
Table V-6-7. Sand Specifications
U.S. Sieve Number Percent Passing
4 95-100
8 70-100
16 40-90
30 25-75
50 2-25
100 <4
200 <2
Source: King County Surface Water Design Manual, September 1998
12. Impermeable Liners for Sand Bed Bottom: Impermeable liners are generally required for
soluble pollutants such as metals and toxic organics and where the underflow could cause
problems with structures. Impermeable liners may be made of clay, concrete or
geomembrane. Clay liners shall have a minimum thickness of 12 inches and meet the
specifications given in Table V-6-8.
Table V-6-8. Clay Liner Specifications
Property Test Method Unit Specification
Permeability ASTM D-2434 cm/sec 1 x 10-6 max.
Plasticity Index of Clay ASTM D-423 & D-
424
percent Not less than
15
Liquid Limit of Clay ASTM D-2216 percent Not less than
30
Clay Particles Passing ASTM D-422 percent Not less than
30
Clay Compaction ASTM D-2216 percent 95% of
Standard
Proctor Density
Source: City of Austin, 1988
• If a geomembrane liner is used it shall have a minimum thickness of 30 mils
and be ultraviolet light resistant. The geomembrane liner shall be protected
from puncture, tearing, and abrasion by installing geotextile fabric on the top
and bottom of the geomembrane.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 659
• Concrete liners may also be used for sedimentation chambers and for
sedimentation and sand filtration basins less than 1,000 square feet in area.
Concrete shall be 5 inches thick Class A or better and shall be reinforced by
steel wire mesh. The steel wire mesh shall be 6 gauge wire or larger and 6-inch
by 6-inch mesh or smaller. An "Ordinary Surface Finish" is required. When the
underlying soil is clay or has an unconfined compressive strength of 0.25 ton per
square foot or less, the concrete shall have a minimum 6-inch compacted
aggregate base. This base must consist of coarse sand and river stone, crushed
stone or equivalent with diameter of 0.75- to 1-inch.
• If an impermeable liner is not required then a geotextile fabric liner shall be
installed that retains the sand and meets the specifications listed in Appendix C
unless the basin has been excavated to bedrock.
• If an impermeable liner is not provided, then an analysis shall be made of
possible adverse effects of seepage zones on groundwater, and near building
foundations, basements, roads, parking lots and sloping sites. Sand filters
without impermeable liners shall not be built on fill sites and shall be located at
least 20-feet downslope and 100-feet upslope from building foundations.
13. Include an access ramp with a slope not to exceed 7H:1V, or equivalent, for maintenance
purposes at the inlet and the outlet of a surface filter.
14. Side slopes for earthen/grass embankments shall not exceed 3H:1V to facilitate mowing.
15. There shall be at least 2 feet clearance between the seasonal high groundwater level and the
bottom of the sand filter.
6.6 Construction Criteria
• The sand filter shall not be placed into service until site construction is complete and
the site is stabilized.
• Place sand in a uniform thickness and compact using a water settling method.
Settling shall be accomplished by flooding the sand with 10-15 gallons of water per
cubic foot of sand. After flooding, the sand shall be smoothed and leveled.
6.7 Maintenance Criteria
Inspections of sand filters and pretreatment systems shall be conducted every 6 months and after
storm events as needed during the first year of operation, and annually thereafter. Maintenance
suggestions include:
• Remove accumulated silt and debris on top of the sand filter when depth exceeds
1/2-inch. Scrape the silt off during dry periods with steel rakes or other devices.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 660
• Frequent overflow or slow drawdown are indicators of plugging problems. A sand
filter shall empty in 24 hours following a storm event (24 hours for the pre-settling
chamber), depending on the ponding depth over the filter bed surface. If the
hydraulic conductivity drops to 1-inch per hour, corrective action is needed.
Examples include:
o Scraping the top layer of fine-grain sediment accumulation (mid-winter
scraping is suggested)
o Removal of thatch
o Aerating the filter surface
o Tilling the filter surface (late-summer rototilling is suggested)
o Replacing the top 4 inches of sand.
o Inspecting geotextiles for clogging.
• Rapid drawdown in the sand bed (greater than 12 inches per hour) indicates short-
circuiting of the filter. Inspect the periphery of the filter bed and cleanouts on the
underdrain pipes for leakage.
• Drawdown tests for the sand bed shall be conducted every two years. These tests
can be conducted by allowing the filter to fill (or partially fill) during a storm event,
then measuring the decline in water level over a 4-8 hour period. An inlet and an
underdrain outlet valve would be necessary to conduct such a test.
• Formation of rills and gullies on the surface of the filter indicates improper function of
the inlet flow spreader, or poor sand compaction. Check for accumulation of debris
on or in the flow spreader and refill rills and gullies with sand.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 661
6.7.1 BMP T810 Sand Filter Vault
6.7.1.1 Description: (Figure V-6-13 and Figure V-6-14)
A sand filter vault is similar to an open sand filter except that the sand layer and underdrains are
installed below grade in a vault. It consists of presettling and sand filtration cells.
6.7.1.2 Applications and Limitations
• Use where space limitations preclude above ground facilities
• Not suitable where high water table and heavy sediment loads are expected
• An elevation difference of 4 feet between inlet and outlet is needed
6.7.1.3 Additional Design Criteria for Vaults
• Optimize sand inlet flow distribution with minimal sand bed disturbance. A maximum
8-inch distance between the top of the spreader and the top of the sand bed is
required. Flows may enter the sand bed by spilling over the top of the wall into a flow
spreader pad or alternatively a pipe and manifold system may be used. Any pipe and
manifold system must retain the required dead storage volume in the first cell,
minimize turbulence, and be readily maintainable.
• If an inlet pipe and manifold system is used, the minimum pipe size shall be 8 inches.
Multiple inlets are required to minimize turbulence and reduce local flow velocities.
• Provide erosion protection along the first foot of the sand bed adjacent to the
spreader. Geotextile fabric secured on the surface of the sand bed, or equivalent
method, may be used.
• Design the presettling cell for sediment collection and removal. Use a V-shaped
bottom, removable bottom panels, or equivalent sludge handling system. Provide
one-foot of sediment storage in the presettling cell.
• Seal the pre-settling chamber to trap oil and trash. This chamber is usually
connected to the sand filtration chamber using a pipe with an inverted elbow to
protect the filter surface from oil and trash.
• If a retaining baffle is necessary for oil/floatables in the presettling cell, it must extend
at least one foot above to one foot below the design flow water level. Provide
provision for the passage of flows in the event of plugging. Provide access opening
and ladder on both sides of the baffle.
• To prevent anoxic conditions, provide a minimum of 24 square feet of ventilation
grate for each 250 square feet of sand bed surface area. For sufficient distribution of
airflow across the sand bed, grates may be located in one area if the sand filter is
small, but placement at each end is preferred. Small grates may also be dispersed
over the entire sand bed area.
• Sand filter vaults must conform to the materials and structural suitability criteria
specified for wet vaults in Chapter 8.
• Provide a sand filter inlet shutoff/bypass valve for maintenance
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 662
• A geotextile fabric over the entire sand bed may be installed that is flexible, highly
permeable, three-dimensional matrix, and adequately secured. This is useful in
trapping trash and litter.
Figure V-6-13. Sand Filter Vault (top view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 663
Figure V-6-14. Sand Filter Vault (side view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 664
6.7.2 BMP T820 Linear Sand Filter
6.7.2.1 Description
Linear sand filters are typically long, shallow, two-celled, rectangular vaults. The first cell is designed
for settling coarse particles, and the second cell contains the sand bed. Stormwater enters the
second cell via a weir section that also functions as a flow spreader.
Figure V-6-15 illustrates a linear sand filter.
6.7.2.2 Application and Limitations
• Applicable in long narrow spaces such as the perimeter of a paved surface.
• As a part of a treatment train such as downstream of a filter strip, upstream of an
infiltration system, or upstream of a wet pond or a biofilter for oil control.
• To treat small drainages (less than 2 acres of impervious area).
• To treat runoff from high-use sites for TSS and oil/grease removal, if applicable.
6.7.2.3 Additional Design Criteria for Linear Sand Filters
• Divide the two cells by a divider wall that is level and extends a minimum of
12 inches above the sand bed.
• Stormwater may enter the sediment cell by sheet flow or a piped inlet.
• The width of the sand cell must be 1-foot minimum to 15 feet maximum.
• The sand filter bed must be a minimum of 12 inches deep and have an 8-inch layer
of drain rock with perforated drainpipe beneath the sand layer.
• The drainpipe must be 6-inch diameter minimum and be wrapped in geotextile and
sloped a minimum of 0.5 percent to promote positive drainage.
• Maximum sand bed ponding depth: 12 inches.
• Must be vented as described above for sand filter vaults.
• Linear sand filters must conform to the materials and structural suitability criteria
specified for wet vaults described in Chapter 8.
• Sediment cell width shall be selected based on sand filter width as follows:
Sand filter width, (w) inches 12-24 24-48 48-72 72+
Sediment cell width, inches 12 18 24 w/3
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Sand Filtration Treatment Facilities Volume V
Chapter 6 665
Figure V-6-15. Linear Sand Filter
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 666
Chapter 7 Biofiltration Treatment Facilities
7.1 Purpose
This chapter addresses five Best Management Practices (BMPs) that are classified as biofiltration
treatment facilities.
Biofilters are vegetated treatment systems (typically grass) that remove pollutants by means of
sedimentation, filtration, soil sorption, and/or plant uptake. They are typically configured as swales or
flat filter strips.
The BMPs discussed in this chapter are designed to remove low concentrations and quantities of
total suspended solids (TSS), heavy metals, petroleum hydrocarbons, and/or nutrients from
stormwater.
7.2 Applications
A biofilter can be used as a basic treatment BMP for stormwater runoff from roadways, driveways,
parking lots, and highly impervious ultra-urban areas or as the first stage of a treatment train. In
cases where hydrocarbons, high TSS concentrations, or debris would be present in the runoff, such
as high-use sites, a pretreatment system for those components is necessary. Placement of the
biofilter in an off-line location is preferred to avoid flattening of the vegetation and the erosive effects
of high flows.
7.3 Site Suitability
The following factors must be considered for determining site suitability:
• Accessibility for operation and maintenance.
• Suitable growth environment (soil, exposure to sunlight, etc.) for the vegetation.
• Adequate siting for a pre-treatment facility if high petroleum hydrocarbon levels
(oil/grease) or high TSS loads could impair treatment capacity or efficiency.
7.4 Best Management Practices
The following five Biofiltration Treatment Facilities BMPs are discussed in this chapter:
BMP T910 – Basic Biofiltration Swale
BMP T920 – Wet Biofiltration Swale
BMP T930 – Continuous Inflow Biofiltration Swale
BMP T940 – Basic Filter Strip & Compost-Amended Filter Strip
BMP T950 – Narrow Area Filter Strip
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 667
7.4.1 BMP T910 Basic Biofiltration Swale
7.4.1.1 Description:
Biofiltration swales are typically shaped as a trapezoid or a parabola in cross section as shown in
Figure V-7-16 and Figure V-7-17.
Figure V-7-16. Typical Swale Section
7.4.1.2 Design Criteria:
• Size the swale using sizing criteria specified in Table V-7-9. Minimum length shall be
100 feet.
• Check the hydraulic capacity/stability using Qmax.
• Select a vegetation cover suitable for the site. Refer to Table V-7-12 through Table
V-7-14.
• Install level spreaders (minimum 1 inch gravel) at the head of all swales, and every
50 feet in swales of 4 feet width. Include sediment cleanouts (weir, settling basin, or
equivalent) at the head of the biofilter as needed.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 668
• Use energy dissipaters (such as quarry spalls or riprap) for increased downslopes.
• A minimum of ten feet (10’) shall be provided between the outside edge of the
bioswale and any property line or obstruction that would impede maintenance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 669
Source: Livingston, et al, 1984
Figure V-7-17. Geometric Formulas for Common Swale Shapes
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 670
Table V-7-9. Sizing Criteria
Design parameter BMP T 910-Biofiltration swale BMP T 940-Filter strip
Longitudinal Slope 0.015 - 0.0251 0.01 - 0.15
Maximum velocity 1 ft / sec @ K2 multiplied by
the WQ design flow rate
0.5 ft / sec @ K multiplied by
the WQ design flow rate
Maximum velocity for channel
stability3
3 ft/sec ---
Maximum water depth4 2”- if mowed frequently; 4” if
mowed infrequently
1-inch max.
Manning coefficient (0.2 – 0.3)5 (0.24 if mowed
infrequently)
0.35 (0.45 if compost
amended, or mowed to
maintain grass height 4”)
Bed width (bottom) (2 - 10 ft)6 ---
Freeboard height 0.5 ft ---
Minimum hydraulic residence
time at K multiplied by Water
Quality Design Flow Rate
9 minutes (18 minutes for
continuous inflow)
9 minutes
Minimum length 100 ft Sufficient to achieve hydraulic
residence time in the filter strip
Maximum sideslope 3 H:1 V
4H:1V preferred
Inlet edge 1” lower than
contributing paved area
Max. tributary drainage flowpath --- 150 feet
Max. longitudinal slope of
contributing area
--- 0.05 (steeper than 0.05 need
upslope flow spreading and
energy dissipation)
Max. lateral slope of contributing
area
--- 0.02 (at the edge of the strip
inlet)
1 For swales, if the slope is less than 1.5% install an underdrain using a perforated pipe, or equivalent. Amend the soil
if necessary to allow effective percolation of water to the underdrain. Install the low-flow drain 6-inches deep in the
soil. Slopes greater than 2.5% need check dams (riprap) at vertical drops of 12-15 inches. Underdrains can be made
of 6-inch Schedule 40 PVC perforated pipe or equivalent with 6” of drain gravel on the pipe. The gravel and pipe
must be enclosed by geotextile fabric (see Figure V-7-19 and Figure V-7-20).
2 K=A ratio of the peak 10-minunte flow predicted by SBUH to the water quality design flow rate estimated using the
WWHM. The value of K for off-line systems is 3.5, and for on-line systems is 2.0 in the City of Auburn.
3 Maximum flowrate for channel stability shall be the 100-year, 24-hour discharge (Q100) calculated with WWHM using
a 15-minute time step. If an hourly time step is used, multiply the Q100 by 1.6.
4 Below the design water depth install an erosion control blanket, at least 4” of topsoil, and the selected biofiltration
mix. Above the water line use a straw mulch or sod.
5 This range of Manning’s n can be used in the equation; b = Qn/1.49y(1.67) s(0.5) – Zy with wider bottom width b, and
lower depth, y, at the same flow. This provides the designer with the option of varying the bottom width of the swale
depending on space limitations. Designing at the higher n within this range at the same flow decreases the hydraulic
design depth, thus placing the pollutants in closer contact with the vegetation and the soil.
6 For swale widths up to 16 feet the cross-section can be divided with a berm (concrete, plastic, compacted earthfill)
using a flow spreader at the inlet (Figure V-7-21).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 671
7.4.1.3 Bypass Guidance
Most biofiltration swales are currently designed to be on-line facilities. However, an off-line design is
possible. Swales designed in an off-line mode should not engage a bypass until the flow rate
exceeds a value determined by multiplying Q, the off-line water quality design flow rate predicted by
the WWHM, by 3.5 for off-line systems and 2.0 for on-line systems. This modified design flow rate is
an estimate of the design flow rate determined by using SBUH procedures. Ecology’s intent is to
maintain recent biofiltration sizing recommendations until more definitive information is collected
concerning bioswale performance. The only advantage of designing a swale to be off-line is that the
stability check, which may make the swale larger, is not necessary.
7.4.1.4 Sizing Procedure for Biofiltration Swales
Preliminary Steps
P.1 Determine the water quality design flow rate (Q) in 15-minute time steps using WWHM.
P.2 Establish the longitudinal slope of the proposed biofilter.
P.3 Select an appropriate vegetated cover for the site. Refer to Table V-7-12 through Table V-7-14.
Design Steps
D.1 Select the type of vegetation and depth of flow (based on frequency of mowing and type of
vegetation).
D.2 Select a value of Manning’s n.
D.3 Select swale shape.
D.4 Use a variation on Manning’s equation to solve for bottom width, b.
b 2.5Qn
1.49ys Zy1.670.5 -
Where:
Q = Water Quality Design flow rate in 15-minute time steps based on WWHM, (ft³/s, cfs)
n = Manning's n (dimensionless)
s = Longitudinal slope as a ratio of vertical rise/horizontal run (dimensionless)
y = depth of flow (ft)
b = bottom width of trapezoid (ft)
For a trapezoid, select a side slope Z of at least 3. Compute b and then top width T, where
T = b + 2yZ.
NOTE: Adjustment factor of 2.5 accounts for the differential between Water Quality design
flow rate and the SBUH design flow. This equation is used to estimate an initial cross-
sectional area. It does not affect the overall biofiltration swale size.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 672
If b for a swale is greater than 10 ft, either investigate how Q can be reduced, divide the flow
by installing a low berm, or arbitrarily set b = 10 ft and continue with the analysis. For other
swale shapes refer to Figure V-7-17.
D.5 Compute A
ATyrectangle= or Atrapezoid = by + Zy2
Afilter strip = Ty
Where:
A = cross-sectional area (ft²)
T = top width of trapezoid or width of a rectangle (ft)
y = depth of flow (ft)
b = bottom width of trapezoid (ft)
Z = side slope
D.6 Compute the flow velocity at design flow rate:
V = K (Q/A)
A = cross-sectional area (ft2)
K = A ratio of the peak 10-minute flow predicted by SBUH to the water quality
design flow rate estimated using the WWHM. The value of K for off-line
systems is 3.5 and for on-line systems is 2.0
Q = water quality design flow rate in 15-minute time steps based on WWHM.
If V >1.0 ft/sec (or V>0.5 ft/sec for a filter strip), repeat steps D-1 to D-6 until the condition is
met. A velocity greater than 1.0 ft/sec was found to flatten grasses, thus reducing filtration. A
velocity lower than this maximum value will allow a 9-minute hydraulic residence time
criterion in a shorter biofilter. If the value of V suggests that a longer biofilter will be needed
than space permits, investigate how Q can be reduced (e.g., use of low impact development
BMPs), or increase y and/or T (up to the allowable maximum values) and repeat the analysis.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 673
D.7 Compute the swale length (L, ft)
L = Vt (60 sec/min)
Where: t = hydraulic residence time (min)
V = flow velocity
Use t = 9 minutes for this calculation (use t = 18 minutes for a continuous inflow biofiltration
swale). If a biofilter length is greater than the space permits, follow the advice in step 6.
If a length less than 100 feet results from this analysis, increase it to 100 feet, the minimum
allowed. In this case, it may be possible to save some space in width and still meet all criteria.
This possibility can be checked by computing V in the 100 ft biofilter for t = 9 minutes,
recalculating A (if V < 1.0 ft/sec) and recalculating T.
D.8 If there are space constraints, the local government and the project proponent should consider
the following solutions (listed in order of preference):
a. Divide the site drainage to flow to multiple biofilters.
b. Use infiltration to provide lower discharge rates to the biofilter (only if the Site
Suitability Criteria in Section 5.3 of this volume are met).
c. Increase vegetation height and design depth of flow (note: the design must ensure
that vegetation remains standing during design flow).
d. Reduce the developed surface area to gain space for biofiltration.
e. Increase the longitudinal slope.
f. Increase the side slopes.
g. Nest the biofilter within or around another BMP.
Stability Check Steps
The stability check must be performed for the combination of highest expected flow and least
vegetation coverage and height. A check is not required for biofiltration swales that are located "off-
line" from the primary conveyance/detention system. Maintain the same units as in the biofiltration
capacity analysis.
The maximum permissible velocity for erosion prevention (Vmax) is 3 feet per second.
S.1 Perform the stability check for the 100-year, return frequency flow using 15-minute time steps
using WWHM. The designer can use the WWHM 100-yr. hourly peak flows times an adjustment
factor of 1.6 to approximate peak flows in 15-minute time steps.
S.2 Estimate the vegetation coverage ("good" or "fair") and height on the first occasion that the
biofilter will receive flow, or whenever the coverage and height will be least. Avoid flow
introduction during the vegetation establishment period by timing planting.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 674
S.3 Estimate the degree of retardance from Table V-7-10. When uncertain, be conservative by
selecting a relatively low degree of retardance.
Table V-7-10. Stability Check Steps (SC)
Guide for Selecting Degree of Retardance
Coverage Average Grass Height
(inches)
Degree of Retardance
Good 2 E. Very Low
2-6 D. Low
6-10 C. Moderate
11-24 B. High
30 A. Very High
Fair 2 E. Very Low
2-6 D. Low
6-10 D. Low
11-24 C. Moderate
30 B. High
* See Chow (1959), In addition, Chow recommended selection of retardance C for a
grass-legume mixture 6-8 inches high and D for a mixture 4-5 inches high. No
retardance recommendations have appeared for emergent wetland species.
Therefore, judgment must be used. Since these species generally grow less densely
than grasses, using a “fair” coverage would be a reasonable approach.
S.4 Select a trial Manning's n for the high flow condition. The minimum value for poor vegetation
cover and low height (possibly, knocked from the vertical by high flow) is 0.033. A good initial
choice under these conditions is 0.04.
S.5 Refer to Figure V-7-18 to obtain a first approximation for VR.
S.6 Compute hydraulic radius, R, from VR in Figure V-7-18 and a Vmax in Table V-7-11.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 675
Source: Livingston, et al, 1984
VR (feet 2 /second)
Figure V-7-18. The Relationship of Manning’s n with VR
for Various Degrees of Flow Retardance (A-E)
Table V-7-11. Guide to Selecting Maximum Permissible Swale Velocities for Stability*
Max Velocity – ft/sec (m/sec)
Cover
Slope
(percent) Erosion-Resistant Soils Easily Eroded Soils
Kentucky bluegrass
Tall fescue 0-5 6 (1.8) 5 (1.5)
Kentucky bluegrass
Ryegrasses
Western wheatgrass
5-10 5 (1.5) 4 (1.2)
0-5 5 (1.5) 4 (1.2) Grass-legume mixture 5-10 4 (1.2) 3 (0.9)
Red fescue 0-5 3 (0.9) 2.5 (0.8)
Redtop 5-10 Not recommended Not recommended
* Adapted from Chow (1959), Livingston et al (1984), and Goldman et al (1986)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 676
S.7 Use Manning’s equation to solve for the actual VR.
S.8 Compare the actual VR from step S.7 and first approximation from step S.5. If they do not
agree within 5 percent, repeat steps S.4 to S.8 until acceptable agreement is reached. If
n<0.033 is needed to get agreement, set n = 0.033, repeat step S.7, and then proceed to
step S.9.
S.9 Compute the actual V for the final design conditions:
S.10 Check to be sure V < Vmax of 3 feet/second.
S.11 Compute the required swale cross-sectional area, A, for stability:
S.12 Compare the A, computed in step S.11 of the stability analysis, with the A from the
biofiltration capacity analysis (step D.5).
If less area is required for stability than is provided for capacity, the capacity design is
acceptable. If not, use A from step S.11 of the stability analysis and recalculate channel
dimensions.
S.13 Calculate the depth of flow at the stability check design flow rate condition for the final
dimensions and use A from step S.11.
S.14 Compare the depth from step S.13 to the depth used in the biofiltration capacity design (Step
D.1). Use the larger of the two and add 0.5 ft. of freeboard to obtain the total depth (yt) of the
swale. Calculate the top width for the full depth using the appropriate equation.
SC.15 Recalculate the hydraulic radius: (use b from Step D.4 calculated previously for biofiltration
capacity, or Step S.12, as appropriate, and yt = total depth from Step S.14)
SC.16 Make a final check for capacity based on the stability check design storm (this check will
ensure that capacity is adequate if the largest expected event coincides with the greatest
retardance). Use Equation 1, a Manning's n selected in step D.2, and the calculated channel
dimensions, including freeboard, to compute the flow capacity of the channel under these
conditions. Use R from step SC-14, above, and A = b(yt) + Z(yt)² using b from Step D.4,
D.15, or S.12 as appropriate.
If the flow capacity is less than the stability check design storm flow rate, increase the
channel cross-sectional area as needed for this conveyance. Specify the new channel
dimensions.
Completion Step
Review all of the criteria and guidelines for biofilter planning, design, installation, and operation above
and specify all of the appropriate features for the application.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 677
Figure V-7-19. Biofiltration Swale Underdrain Detail
Figure V-7-20. Biofiltration Swale Low-Flow Drain Detail
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 678
Dividing Berm Height = Design Flow
Depth (y) + 2” (min.)
Figure V-7-21. Swale Dividing Berm
7.4.1.5 Soil Criteria
• Use the following list as a guide for choosing appropriate soils for the biofiltration
swale. Use at least 8-inches of the following top soil mix:
o Sandy loam 60-90%
o Clay 0-10%
o Composted organic matter, (excluding animal waste, toxics) 10-30%
• Use compost amended soil where practicable.
• Till to at least 8-inch depth.
• For longitudinal slopes of < 2 percent use more sand to obtain more infiltration.
• If groundwater contamination is a concern, seal the bed with clay or a geomembrane
liner.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 679
7.4.1.6 Vegetation Criteria
• See Table V-7-12 through Table V-7-14 for recommended grasses, wetland plants,
and groundcovers.
• Select fine, turf-forming, water-resistant grasses where vegetative growth and
moisture will be adequate for growth.
• Irrigate if moisture is insufficient during dry weather season.
• Use sod with low clay content and where needed to initiate adequate vegetative
growth. Preferably sod should be laid to a minimum of one-foot vertical depth above
the swale bottom.
• Consider sun/shade conditions for adequate vegetative growth and avoid prolonged
shading of any portion not planted with shade tolerant vegetation.
• Stabilize soil areas upslope of the biofilter to prevent erosion.
• Fertilizing a biofilter shall not be allowed.
7.4.1.7 Construction Criteria
• Do not put swale into operation until exposed soil in contributing drainage area is stabilized.
• Keep erosion and sediment control measures in place until swale vegetation is established.
• Avoid compaction during construction.
• Grade biofilters to attain uniform longitudinal and lateral slopes.
7.4.1.8 Maintenance Criteria
• Inspect biofilters at least once every 6 months, preferably during storm events, and
also after storm events of > 0.5 inch rainfall/ 24 hours. Maintain adequate grass
growth and eliminate bare spots.
• Mow grasses, if needed for good growth. Typically maintain at 4 – 9 inches but not
below design flow level.
• Remove sediment as needed at head of the swale if grass growth is inhibited in
greater than 10 percent of the swale, or if the sediment is blocking the distribution
and entry of the water.
• Remove leaves, litter, and oily materials, and re-seed or resod, and regrade, as
needed. Clean curb cuts and level spreaders as needed.
Prevent scouring and soil erosion in the biofilter. If flow channeling occurs, regrade and
reseed the biofilter, as necessary.
• Maintain access to biofilter inlet, outlet, and to mowing (Figure V-7-22).
• If a swale is equipped with underdrains, vehicular traffic on the swale bottom (other
than grass mowing equipment) shall be avoided to prevent damage to the
drainpipes.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 680
Table V-7-12. Grass Seed Mixes Suitable for Biofiltration Swale Treatment Areas
Mix 1 Mix 2
75-80 percent tall or meadow fescue 60-70 percent tall fescue
10-15 percent seaside/colonial
bentgrass
10-15 percent seaside/colonial
bentgrass
5-10 percent redtop 10-15 percent meadow foxtail
6-10 percent alsike clover
1-5 percent marshfield big trefoil
1-6 percent redtop
Note: All percentages are by weight, based on Briargreen, Inc.
Table V-7-13. Groundcovers & Grasses Suitable for the Upper Side Slopes
of a Biofiltration Swale in Western Washington
Groundcovers
kinnikinnick* Arctostaphylos uva-ursi
Epimedium Epimedium grandiflorum
creeping forget-me-not Omphalodes verna
-- Euonymus lanceolata
yellow-root Xanthorhiza simplissima
-- Genista
white lawn clover Trifolium repens
white sweet clover* Melilotus alba
------- Rubus calycinoides
strawberry* Fragaria chiloensis
broadleaf lupine* Lupinus latifolius
Grasses (drought-tolerant, minimum mowing)
dwarf tall fescues Festuca spp. (e.g., Many Mustang, Silverado)
hard fescue Festuca ovina duriuscula (e.g., Reliant, Aurora)
tufted fescue Festuca amethystina
buffalo grass Buchloe dactyloides
red fescue* Festuca rubra
tall fescue grass* Festuca arundinacea
blue oatgrass Helictotrichon sempervirens
* Good choices for swales with significant periods of flow, such as those downstream of a detention facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 681
Table V-7-14. Recommended Plants for Wet Biofiltration Swale
Common Name Scientific Name Spacing
(on center)
Shortawn foxtail Alopecurus aequalis seed
Water foxtail Alopecurus geniculatus seed
Spike rush Eleocharis spp. 4 inches
Slough sedge* Carex obnupta 6 inches or seed
Sawbeak sedge Carex stipata 6 inches
Sedge Carex spp. 6 inches
Western mannagrass Glyceria occidentalis seed
Velvetgrass Holcus mollis seed
Slender rush Juncus tenuis 6 inches
Watercress* Rorippa nasturtium-aquaticum 12 inches
Water parsley* Oenanthe sarmentosa 6 inches
Hardstem bulrush Scirpus acutus 6 inches
Small-fruited bulrush Scirpus microcarpus 12 inches
* Good choices for swales with significant periods of flow, such as those downstream of
a detention facility.
Cattail (Typha latifolia) is not appropriate for most wet swales because of its very dense and clumping growth habit
which prevents water from filtering through the clump.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 682
Figure V-7-22. Biofiltration Swale Access Features
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 683
7.4.2 BMP T920 Wet Biofiltration Swale
7.4.2.1 Description
A wet biofiltration swale is a variation of a basic biofiltration swale for use where the longitudinal slope
is slight, water tables are high, or continuous low base flow is likely to result in saturated soil
conditions. Where saturation exceeds about 2 weeks, typical grasses will die. Thus, vegetation
specifically adapted to saturated soil conditions is needed. Different vegetation in turn requires
modification of several of the design parameters for the basic biofiltration swale.
7.4.2.2 Performance Objectives
To remove low concentrations of pollutants such as TSS, heavy metals, nutrients, and petroleum
hydrocarbons.
7.4.2.3 Applications/Limitations
Wet biofiltration swales are applied where a basic biofiltration swale is desired but not allowed or
advisable because one or more of the following conditions exist:
• The swale is located on glacial till soils and is downstream of a detention pond
providing flow control.
• Saturated soil conditions are likely because of seeps or base flows on the site.
• Longitudinal slopes shall be less than 2 percent.
7.4.2.4 Criteria
Use the same sizing and criteria as for basic biofiltration swales except for the following:
1. Adjust for extended wet season flow.
• If the swale will be downstream of a detention pond or vault providing flow control,
multiply the treatment area (bottom width times length) of the swale by 2, and
readjust the swale length, if desired. Maintain a 5:1 length to width ratio.
2. Swale geometry.
• The bottom width may be increased to 25 feet maximum, but a length-to-width ratio
of 5:1 must be provided. No longitudinal dividing berm is needed.
The minimum swale length is 100 feet.
• If longitudinal slopes are greater than 2 percent, the wet swale must be stepped so
that the slope within the stepped sections averages 2 percent. Steps may be made
of retaining walls, log check dams, or short riprap sections. No underdrain or low-
flow drain is required.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 684
3. High-flow bypass
• A high-flow bypass (i.e., an off-line design) is required for flows greater than the off-
line water quality design flow that has been increased by 3.5. The bypass may be an
open channel parallel to the wet biofiltration swale.
4. Water Depth and Base Flow
• Design water depth shall be 4 inches for all wetland vegetation selections.
• No underdrains or low-flow drains are required.
5. Flow Velocity, Energy Dissipation, and Flow Spreading
• No flow spreader is required.
6. Access
• Access is only required to the inflow and outflow of the swale. Access along the
swale is not required.
• Wheel strips may not be used for access.
7. Planting Requirements
• A list of acceptable plants and recommended spacing is shown in Table V-7-14.
• A wetland seed mix may be applied by hydroseeding, but if coverage is poor,
planting of rootstock or nursery stock is required. Poor coverage is considered to be
more than 30 percent bare area through the upper 2/3 of the swale after four weeks.
8. Maintenance Considerations
• Mowing of wetland vegetation is not required. However, harvesting of very dense
vegetation may be desirable in the fall after plant die-back to prevent the sloughing of
excess organic material into receiving waters. Fall harvesting of Juncus species is
not recommended.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 685
7.4.3 BMP T930 Continuous Inflow Biofiltration Swale
7.4.3.1 Description:
In situations where water enters a biofiltration swale continuously along the side slope rather than
discretely at the head, a different design approach–the continuous inflow biofiltration swale–is
needed. The basic swale design is modified by increasing swale length to achieve an equivalent
average residence time.
7.4.3.2 Applications
A continuous inflow biofiltration swale is to be used when inflows are not concentrated, such as
locations along the shoulder of a road without curbs. This design may also be used where frequent,
small point flows enter a swale, such as through curb inlet ports spaced at intervals along a road, or
from a parking lot with frequent curb cuts. In general, no inlet port shall carry more than about
10 percent of the flow.
A continuous inflow swale is not appropriate for a situation in which significant lateral flows enter a
swale at some point downstream from the head of the swale. In this situation, the swale width and
length must be recalculated from the point of confluence to the discharge point in order to provide
adequate treatment for the increased flows.
7.4.3.3 Design Criteria
Same as specified for basic biofiltration swale except for the following:
• The design flow for continuous inflow swales must include runoff from the pervious
side slopes draining to the swale along the entire swale length. Therefore, they must
be on-line facilities.
• If only a single design flow is used, the flow rate at the outlet should be used. The
goal is to achieve an average residence time through the swale of 9 minutes as
calculated using the on-line water quality design flow rate multiplied by the ratio, K
(see footnotes in Table V-7-9). Assuming an even distribution of inflow into the side
of the swale double the hydraulic residence time to a minimum of 18 minutes.
• Interior side slopes above the water quality design treatment elevation shall be
planted in grass. A typical lawn seed mix or the biofiltration seed mixes are
acceptable. Landscape plants or groundcovers other than grass may not be used
anywhere between the runoff inflow elevation and the bottom of the swale.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 686
7.4.4 BMP T940 Basic Filter Strip
7.4.4.1 Description
A basic filter strip is flat with no side slopes (Figure V-7-23). Untreated stormwater is distributed as
sheet flow across the inlet width of a biofilter strip.
7.4.4.2 Applications/Limitations
The basic filter strip is typically used on-line and adjacent and parallel to a paved area such as
parking lots, driveways, and roadways. Where a filter strip area is compost-amended to a minimum
of 10% organic content in accordance with BMP L613; with hydroseeded grass maintained at 95%
density and a 4-inch length by mowing and periodic re-seeding (possible landscaping with
herbaceous shrubs), the filter strip serves as an Enhanced Treatment option.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 687
Figure V-7-23. Typical Filter Strip
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 688
7.4.4.3 Design Criteria for Filter strips:
• Use the Design Criteria specified in Table V-7-9.
• Filter strips shall only receive sheet flow.
• Use curb cuts 12-inch wide and 1-inch above the filter strip inlet.
7.4.4.4 Sizing Procedure
1. Calculate the design flow depth using Manning’s equation as follows:
KQ = (1.49A R0.67 s 0.5)/n
Substituting for AR:
KQ = (1.49Ty1.67 s0.5)/n
Where:
Ty = Arectangle, ft
2
y = Rrectangle, design depth of flow, ft. (1 inch maximum)
Q = peak Water Quality design flow rate based on WWHM or an approved continuous
simulation model, ft3/sec
K = A ratio of the peak 10-minute flow predicted by SBUH to the water quality
design flow rate estimated using the WWHM. The value of K for off-line
systems is 3.5 and for on-line systems is 2.0.1
n = Manning’s roughness coefficient
s = Longitudinal slope of filter strip parallel to direction of flow
T = Width of filter strip perpendicular to the direction of flow, ft.
A = Filter strip inlet cross-sectional flow area (rectangular), ft2
R = hydraulic radius, ft.
Rearranging for y:
y = [KQn/1.49Ts0.5]0.6
y must not exceed 1 inch
2. Calculate the design flow velocity V, ft./sec., through the filter strip:
V = KQ/Ty
V must not exceed 0.5 ft./sec
3. Calculate required length, ft., of the filter strip at the minimum hydraulic residence time, t, of 9
minutes:
L = tV = 540 V
1 As in swale design, an adjustment factor of K accounts for the differential between the Water Quality design flow
rate calculated using WWHM and the SBUH design flow.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 689
7.4.5 BMP T950 Narrow Area Filter Strip
7.4.5.1 Description:
This section describes a filter strip design2 for impervious areas with flowpaths of 30 feet or less that
can drain along their widest dimension to grassy areas.
7.4.5.2 Applications/Limitations:
A narrow area filter strip could be used at roadways with limited right-of-way, or for narrow parking
strips. If space is available to use the basic filter strip design, that design should be used in
preference to the narrow filter strip.
7.4.5.3 Design Criteria:
Design criteria for narrow area filter strips are the same as specified for basic filter strips. The sizing
of a narrow area filter strip is based on the length of flowpath draining to the filter strip and the
longitudinal slope of the filter strip itself (parallel to the flowpath).
1. Determine the length of the flowpath from the upstream to the downstream edge of the
impervious area draining sheet flow to the strip. Normally this is the same as the width of the
paved area, but if the site is sloped, the flow path may be longer than the width of the
impervious area.
2. Calculate the longitudinal slope of the filter strip (along the direction of unconcentrated flow),
averaged over the total width of the filter strip.
• The minimum slope size is 2 percent. If the slope is less than 2 percent, use
2 percent for sizing purposes.
• The maximum allowable filter strip slope is 20 percent. If the slope exceeds
20 percent, the filter strip must be stepped so that the treatment areas between drop
sections do not have a longitudinal slope greater than 20 percent. Provide erosion
protection at the base and flow spreaders for the drop sections. Vertical drops along
the slope must not exceed 12 inches in height. If this is not possible, a different
treatment facility must be selected.
3. Select the appropriate filter strip length for the flowpath length and filter strip longitudinal slope
(Steps 1 and 2 above) from the graph in Figure V-7-24. Design the filter strip to provide this
minimum length L along the entire stretch of pavement draining into it.
2 This narrow area filter strip design method is included here because technical limitations exist in the basic design
method which results in filter strips that are proportionately longer as the contributing drainage becomes narrower (a
result that is counter-intuitive). Research by several parties is underway to evaluate filter strip design parameters.
This research may lead to more stringent design requirements that would supersede the design criteria presented
here.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Biofiltration Treatment Facilities Volume V
Chapter 7 690
To use the graph, find the length of the flowpath on one of the curves (interpolate between
curves as necessary). Move along the curve to the point where the design longitudinal slope
of the filter strip (x-axis) is directly below. Read the filter strip length on the y-axis which
corresponds to the intersection point.
0.0
5.0
10.0
15.0
20.0
0%5%10%15%20%
Filter Strip Slope
Fi
l
t
e
r
S
t
r
i
p
L
e
n
g
t
h
(
f
e
e
t
)
Note: minimum allowable filter strip length is 4 feet
Flowpath
= 30 feet
20 feet
10 feet
Figure V-7-24. Filter Strip Lengths for Narrow Right-of-Way
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 691
Chapter 8 Wetpool Facilities
8.1 Purpose
This Chapter presents the methods, criteria, and details for analysis and design of wetponds,
wetvaults, and stormwater wetlands. These facilities have as a common element, a permanent pool
of water - the wetpool. Each of the wetpool facilities can be combined with detention storage in a
combined facility.
8.2 Best Management Practices
The following wetpool facility BMPs are discussed in this chapter:
BMP T1010 – Wetponds - Basic and Large
BMP T1020 – Wetvaults
BMP T1030 – Stormwater Wetlands
BMP T1040 – Combined Detention and Wetpool Facilities
The specific BMPs that are selected should be based on the Treatment Facility Menus discussed in
Chapter 2.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 692
8.2.1 BMP T1010 Wetponds - Basic and Large
8.2.1.1 Description:
A wetpond is a constructed stormwater pond that retains a permanent pool of water ("wetpool") at
least during the wet season. The volume of the wetpool is related to the effectiveness of the pond in
settling particulate pollutants. As an option, a shallow marsh area can be created within the
permanent pool volume to provide additional treatment for nutrient removal. Flow control can be
provided in the "live storage" area above the permanent pool. Figure V-8-25 and Figure V-8-26
illustrate a typical wetpond.
8.2.1.2 Design Criteria:
For a basic wetpond, the wetpool volume provided shall be equal to or greater than the total volume
of runoff from the water quality design storm, which is the 6-month, 24-hour storm event.
Alternatively, the 91st percentile, 24-hour runoff volume predicted by WWHM can be used.
A large wetpond requires a wetpool volume at least 1.5 times larger than the total volume of runoff
from the 6-month, 24-hour storm event.
For private wetponds, a minimum three-inch (3”) diameter power conduit shall be grounded to the
edge of the pond for possible future installation of aerators.
Aerators are required to be installed on public ponds. Power provided to public ponds shall be
independently metered. Specific power and aeration requirements will be determined case by case
during plan review and will be based upon the size and configuration of the wetpond.
Design features that encourage plug flow and avoid dead zones are:
• Dissipating energy at the inlet.
• Providing a large length-to-width ratio.
• Providing a broad surface for water exchange using a berm designed as a broad-
crested weir to divide the wetpond into two cells rather than a constricted area such
as a pipe.
• Maximizing the flowpath between inlet and outlet, including the vertical path, also
enhances treatment by increasing residence time.
General wetpond design criteria and concepts are shown in Figure V-8-25 and Figure V-8-26.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 693
Figure V-8-25. Wetpond (top view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 694
Figure V-8-26. Wetpond (side view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 695
8.2.1.3 Sizing Procedure
Procedures for determining a wetpond's dimensions and volume are outlined below.
1. Identify required wetpool volume using the SCS (now known as NRCS) curve number
equations. A basic wetpond requires a volume equal to or greater than the total volume
of runoff from the 6-month, 24-hour storm event, or, alternatively, the 91st percentile,
24-hour runoff volume using WWHM. A large wetpond requires a volume at least
1.5 times the total volume of runoff from the 6-month, 24-hour storm event or 1.5 times
the 91st percentile, 24-hour runoff volume using an approved continuous runoff model.
SP
SPQd8.0
]2.0[2
+
-= for P 0.2S
and
0=Qd for P < 0.2S
Where:
Qd = runoff depth in inches over area
P = precipitation depth in inches over area
S = potential maximum detention, in inches over area, due to infiltration, storage, etc.
The area’s potential maximum depth, S, is related to its curve number, CN:
10)/1000(-=CNS
2. Determine wetpool dimensions. Determine the wetpool dimensions satisfying the design
criteria outlined below and illustrated in Figure V-8-25 and Figure V-8-26. A simple way
to check the volume of each wetpool cell is to use the following equation:
V = hAA(+)12
2
where: V = wetpool volume (ft3)
h = wetpool average depth (ft)
A1 = water quality design surface area of wetpool (sf)
A2 = bottom area of wetpool (sf)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 696
3. Design pond outlet pipe and determine primary overflow water surface. The pond outlet
pipe shall be placed on a reverse grade from the pond's wetpool to the outlet structure.
Use the following procedure to design the pond outlet pipe and determine the primary
overflow water surface elevation:
a. Use the nomographs in Figure V-8-27 and Figure V-8-28 to select a trial size for
the pond outlet pipe sufficient to pass the on-line WQ design flow Qwq as
determined using WWHM.
b. Use Figure V-8-29 to determine the critical depth dc at the outflow end of the pipe
for Qwq.
c. Use Figure V-8-30 to determine the flow area Ac at critical depth.
d. Calculate the flow velocity at critical depth using continuity equation
(Vc = Qwq /Ac).
e. Calculate the velocity head VH (VH =Vc
2 /2g, where g is the gravitational constant,
32.2 feet per second).
f. Determine the primary overflow water surface elevation by adding the velocity
head and critical depth to the invert elevation at the outflow end of the pond
outlet pipe (i.e., overflow water surface elevation = outflow invert + dc + VH).
g. Adjust outlet pipe diameter as needed and repeat Steps (a) through (e).
4. Determine wetpond dimensions.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 697
Figure V-8-27. Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control
DI
A
M
E
T
E
R
O
F
C
U
L
V
E
R
T
(
D
)
I
N
I
N
C
H
E
S
ENTRANCE
TYPE
HW
D SCALE
(1)
(2)
(3)
Square edge with
Groove end with
Groove end
headwall
headwall
projecting
EXAMPLE
D = 42 inches (3.0 feet).
Q = 120 cfs
HW*
*D in feet
HW
D (feet)
(1)
(2)
(3)
2.5
2.1
2.2
8.8
7.4
7.7
EXAM
P
L
E
DI
S
C
H
A
R
G
E
(
Q
)
I
N
C
F
S
HE
A
D
W
A
T
E
R
D
E
P
T
H
I
N
D
I
A
M
E
T
E
R
S
(
H
W
/
D
)
To use scale (2) or (3) project
horizontally to scale (1), then
use straight inclined line through
D and Q scales, or reverse as
illustrated.
1.0
2
3
4
5
6
8
10
20
30
40
50
60
12
15
18
21
24
27
30
33
36
80
100
200
300
400
500
600
800
1,000
42
48
54
60
2,000
3,000
4,000
5,000
6,000
8,000
10,000
72
84
96
108
120
132
144
156
168
180
ENTRANCE TYPE
SQUARE EDGE WITH
HEADWALL
GROOVE END WITH
GROOVE END
PROJECTING
HEADWALL
PLAN
PLAN
(1)(2)(3)
.5
.5 .5
.6
.6 .6
.7
.7 .7
.8
.8 .8
.9
.9 .9
1.0
1.0 1.0
1.5
1.5 1.5
2.
2.
3.
3.3.
4.
4.
4.
5.
2.
(3)
(2)
(1)
5.
5.
6.
6.
6.
New Design Manual
Figure 4.3.1.B Headwater Depth for Smooth Interior Pipe Culverts with Inlet Control
Revised 12-2-97/Mdev
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 698
Figure V-8-28. Headwater Depth for Corrugated Pipe Culverts with Inlet Control
ST
A
N
D
A
R
D
C
.
M
.
DI
A
M
E
T
E
R
O
F
C
U
L
V
E
R
T
(
D
)
I
N
I
N
C
H
E
S
ST
R
U
C
T
U
R
A
L
P
L
A
T
E
C
.
M
.
ENTRANCE
TYPE
HW
D SCALE
(1)
(2)
(3)
Headwall
Mitered to conform
to slope
Projecting
EXAMPLE
D = 36 inches (3.0 feet).
Q = 66 cfs
HW*
*D in feet
HW
D (feet)
(1)
(2)
(3)
1.8
2.1
2.2
5.4
6.3
6.6
EXAM
P
L
E
DI
S
C
H
A
R
G
E
(
Q
)
I
N
C
F
S
HE
A
D
W
A
T
E
R
D
E
P
T
H
I
N
D
I
A
M
E
T
E
R
S
(
H
W
/
D
)
To use scale (2) or (3) project
horizontally to scale (1), then
use straight inclined line through
D and Q scales, or reverse as
illustrated
1.0
2
3
4
5
6
8
10
20
30
40
50
60
12
15
18
21
24
27
30
33
36
80
100
200
300
400
500
600
800
1,000
42
48
54
60
2,000
3,000
4,000
5,000
6,000
8,000
10,000
72
84
96
108
120
132
144
156
168
180
ENTRANCE TYPE
HEADWALL PLAN
MITERED TO
CONFORM
TO SLOPE
SECTION
PROJECTING
SECTION
(1)
(2)
(3)
.5 .5
.5
.6 .6
.6
.7 .7
.7
.8 .8
.8
.9 .9
.9
1.0 1.0
1.0
1.5
1.5 1.5
2.
2.
3.
3.
3.
4.
4.
4.
5.
2.
(3)
(2)
(1)
5.
5.
6.
6.
6.
New Design Manual
Figure 4.3.1.C Headwater Depth for Corrugated Pipe Culverts with Inlet Control
Revised 11-24-97/Mdev
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 699
Figure V-8-29. Critical Depth of Flow for Circular Culverts
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 700
Figure V-8-30. Circular Channel Ratios
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 701
8.2.1.4 Wetpool Geometry
Divide the wetpool into two cells separated by a baffle or berm. The first cell shall
contain between 25 to 35 percent of the total wetpool volume. The baffle or berm
volume shall not count as part of the total wetpool volume.
Provide sediment storage in the first cell. The sediment storage shall have a
minimum depth of 1-foot. Install a fixed sediment depth monitor in the first cell to
gauge sediment accumulation unless an alternative gauging method is proposed.
The minimum depth of the first cell shall be 4 feet, exclusive of sediment storage
requirements. The depth of the first cell may be greater than the depth of the second
cell.
The maximum depth of each cell shall not exceed 8 feet (exclusive of sediment
storage in the first cell). Plant pool depths of 3 feet or shallower (second cell) with
emergent wetland vegetation (see planting requirements).
Place inlets and outlets to maximize the flowpath through the facility. The ratio of
flowpath length to width from the inlet to the outlet shall be at least 3:1. The flowpath
length is defined as the distance from the inlet to the outlet, as measured at mid-
depth. The width at mid-depth can be found as follows: width = (average top width +
average bottom width)/2.
Wetponds with wetpool volumes less than or equal to 4,000 cubic feet may be single
celled (i.e., no baffle or berm is required). However, it is especially important in this
case that the flow path length be maximized. The ratio of flow path length to width
shall be at least 4:1 in single celled wetponds, but should preferably be 5:1.
All inlets shall enter the first cell. For multiple inlets, the length-to-width ratio shall be
based on the average flowpath length for all inlets.
Line the first cell in accordance with the liner requirements contained in Section 3.4.
8.2.1.5 Berms, Baffles, and Slopes
A berm or baffle shall extend across the full width of the wetpool, and tie into the
wetpond side slopes. If the berm embankments are greater than 4 feet in height, the
berm must be constructed by excavating a key with dimensions equal to 50 percent
of the embankment cross-sectional height and width. This requirement may be
waived if recommended by a geotechnical engineer for specific site conditions. The
geotechnical analysis shall address situations in which one of the two cells is empty
while the other remains full of water.
The top of the berm may extend to the WQ design water surface or be 1-foot below
the WQ design water surface. If at the WQ design water surface, berm side slopes
shall be 3H:1V. Berm side slopes may be steeper (up to 2H:1V) if the berm is
submerged 1-foot.
If good vegetation cover is not established on the berm, erosion control measures
shall be used to prevent erosion of the berm back-slope when the pond is initially
filled.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 702
The interior berm or baffle may be a retaining wall provided that the design is
prepared and stamped by a licensed civil engineer. If a baffle or retaining wall is
used, it shall be submerged one foot below the design water surface to discourage
access by pedestrians.
Criteria for wetpond side slopes are included in Section 3.3.
8.2.1.6 Embankments
Embankments that impound water must comply with the Washington State Dam Safety Regulations
(Chapter 173-175 WAC). If the impoundment has a storage capacity (including both water and
sediment storage volumes) greater than 10 acre-feet (435,600 cubic feet or 3.26 million gallons)
above natural ground level, then dam safety design and review are required by the Department of
Ecology. Contact Ecology for information about this regulation.
8.2.1.7 Inlet and Outlet
See Figure V-8-25 and Figure V-8-26 for details on the following requirements:
Submerge the inlet to the wetpond with the inlet pipe invert a minimum of two feet
from the pond bottom (not including sediment storage). The top of the inlet pipe shall
be submerged at least 1-foot, if possible.
Provide an outlet structure. Either a Type 2 catch basin with a grated opening (“jail
house window”) or a manhole with a cone grate (“birdcage”) may be used (see
Volume III, Figure III-2-9 for an illustration).
The pond outlet pipe (as opposed to the manhole or type 2 catch basin outlet pipe)
shall be back-sloped or have a down-turned elbow, and extend 1 foot below the WQ
design water surface.
Size the pond outlet pipe, at a minimum, to pass the on-line WQ design flow. The
highest invert of the outlet pipe sets the WQ design water surface elevation.
The overflow criteria for single-purpose (treatment only, not combined with flow
control) wetponds are as follows:
o The requirement for primary overflow is satisfied by either the grated inlet to
the outlet structure or by a birdcage above the pond outlet structure.
o The bottom of the grate opening in the outlet structure shall be set at or
above the height needed to pass the WQ design flow through the pond outlet
pipe. The grate invert elevation sets the overflow water surface elevation.
o The grated opening and downstream conveyance shall be sized to pass the
100-year design flow. The capacity of the outlet system shall be sized to pass
the peak flow for the conveyance requirements.
Provide an emergency spillway and design it according to the requirements for
detention ponds (see Volume III, Section 2.3.1).
The City may require a bypass/shutoff valve to enable the pond to be taken offline for
maintenance purposes.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 703
A gravity drain for maintenance is recommended if grade allows.
o The drain invert shall be at least 6 inches below the top elevation of the
dividing berm or baffle. Deeper drains are encouraged where feasible, but
must be no deeper than 18 inches above the pond bottom.
o The drain shall be at least 8 inches (minimum) diameter and shall be
controlled by a valve. Use of a shear gate is allowed only at the inlet end of a
pipe located within an approved structure.
o Provide operational access to the valve to the finished ground surface.
o The valve location shall be accessible and well marked with 1-foot of paving
placed around the box. It must also be protected from damage and
unauthorized operation.
o A valve box is allowed to a maximum depth of 5 feet without an access
manhole. If over 5 feet deep, an access manhole or vault is required.
All metal parts shall be corrosion-resistant. Do not use galvanized materials.
8.2.1.8 Access and Setbacks
All facilities shall be a minimum of 20 feet from any structure, property line, and any
vegetative buffer required by the local government, and 100 feet from any septic
tank/drainfield.
All facilities shall be a minimum of 50 feet from any slope greater than 20 percent. A
geotechnical report must address the potential impact of a wetpond on a slope steeper
than 20% or if closer than 50 feet.
Provide access and maintenance roads and designed them according to the
requirements for detention ponds. Access and maintenance roads shall extend to both
the wetpond inlet and outlet structures. An access ramp (7H minimum:1V) shall be
provided to the bottom of the first cell unless all portions of the cell can be reached and
sediment loaded from the top of the pond.
The internal berm of a wetpond or combined detention and wetpond may be used for
access if it is designed to support a loaded 80,000 pound truck considering the berm is
normally submerged and saturated.
8.2.1.9 Planting Requirements
Planting requirements for detention ponds also apply to wetponds.
Large wetponds intended for phosphorus control shall not be planted within the cells,
as the plants will release phosphorus in the winter when they die off.
If the second cell of a basic wetpond is 3 feet deep or shallower, the bottom area
shall be planted with emergent wetland vegetation. See Table V-8-15 for
recommended emergent wetland plant species for wetponds. The recommendations
in Table V-8-15 are for all of western Washington. Local knowledge should be used
to tailor this information to Auburn as appropriate.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 704
Cattails (Typha latifolia) shall not be used because they tend to crowd out other
species and will typically establish themselves anyway.
If the wetpond discharges to a phosphorus-sensitive lake or wetland, shrubs that
form a dense cover should be planted on slopes above the WQ design water surface
on at least three sides. Native vegetation species shall be used in all cases.
8.2.1.10 Recommended Design Features
The following features should be incorporated into the wetpond design where site conditions allow:
The method of construction of soil/landscape systems can cause natural selection of
specific plant species. Consult a soil restoration or wetland soil scientist for site-
specific recommendations. The soil formulation will impact the plant species that will
flourish or suffer on the site, and the formulation should be such that it encourages
desired species and discourages undesired species.
For private wetpond facilities, it is recommended that some form of recirculation be
provided, such as an aerator, to prevent stagnation and low dissolved oxygen
conditions. Recirculation is required for all public wetpond facilities.
A flow length-to-width ratio greater than the 3:1 minimum is desirable. If the ratio is
4:1 or greater, then the dividing berm is not required, and the pond may consist of
one cell rather than two. A one-cell pond must provide at least 6-inches of sediment
storage depth.
A tear-drop shape, with the inlet at the narrow end, rather than a rectangular pond is
preferred since it minimizes dead zones caused by corners.
A small amount of base flow is desirable to maintain circulation and reduce the
potential for low oxygen conditions during late summer.
Evergreen or columnar deciduous trees along the west and south sides of ponds are
recommended to reduce thermal heating, except that no trees or shrubs may be
planted on berms meeting the criteria of dams regulated for safety. In addition to
shade, trees and shrubs also discourage waterfowl use and the attendant
phosphorus enrichment problems they cause. Trees should be set back so that the
branches will not extend over the pond.
The number of inlets to the facility should be limited; ideally there should be only one
inlet. The flowpath length should be maximized from inlet to outlet for all inlets to the
facility.
The access and maintenance road could be extended along the full length of the
wetpond and could double as play courts or picnic areas. Placing finely ground bark
or other natural material over the road surface would render it more pedestrian
friendly.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 705
The following design features should be incorporated to enhance aesthetics where
possible:
o Provide pedestrian access to shallow pool areas enhanced with emergent
wetland vegetation. This allows the pond to be more accessible without
incurring safety risks.
o Provide side slopes that are sufficiently gentle (3H:1V or flatter).
o Create flat areas overlooking or adjoining the pond for picnic tables or seating
that can be used by residents. Walking or jogging trails around the pond are
easily integrated into site design.
o Include fountains or integrated waterfall features for privately maintained
facilities.
o Provide visual enhancement with clusters of trees and shrubs. On most pond
sites, it is important to amend the soil before planting since ponds are
typically placed well below the native soil horizon in very poor soils. Make
sure dam safety restrictions against planting do not apply.
o Orient the pond length along the direction of prevailing summer winds
(typically west or southwest) to enhance wind mixing.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 706
Table V-8-15. Emergent Wetland Species Recommended for Wetponds
Species Common Name Notes Maximum
Depth
INUNDATION TO 1-FOOT
Agrostis exarata1 Spike bent grass Prairie to coast 2 feet
Carex stipata Sawbeak sedge Wet ground
Eleocharis palustris Spike rush Margins of ponds, wet meadows 2 feet
Glyceria occidentalis Western mannagrass Marshes, pond margins 2 feet
Juncus tenuis Slender rush Wet soils, wetland margins
Oenanthe sarmentosa Water parsley Shallow water along stream and pond margins;
needs saturated soils all summer
Scirpus atrocinctus (formerly
S. cyperinus)
Woolgrass Tolerates shallow water; tall clumps
Scirpus microcarpus Small-fruited bulrush Wet ground to 18 inches depth 18 inches
Sagittaria latifolia Arrowhead
Inundation 1 to 2 feet
Agrostis exarata1 Spike bent grass Prairie to coast
Alisma plantago-aquatica Water plantain
Eleocharis palustris Spike rush Margins of ponds, wet meadows
Glyceria occidentalis Western mannagrass Marshes, pond margins
Juncus effuses Soft rush Wet meadows, pastures, wetland margins
Scirpus microcarpus Small-fruited bulrush Wet ground to 18 inches depth 18 inches
Sparganium emmersum Bur reed Shallow standing water, saturated soils
Inundation 1 to 3 feet
Carex obnupta Slough sedge Wet ground or standing water 1.5 to 3 feet
Beckmania syzigachne1 Western sloughgrass Wet prairie to pond margins
Scirpus acutus2 Hardstem bulrush Single tall stems, not clumping 3 feet
Scirpus validus2 Softstem bulrush
Inundation GREATER THAN 3 feet
Nuphar polysepalum Spatterdock Deep water 3 to 7.5 feet
Nymphaea odorata1 White waterlily Shallow to deep ponds 6 feet
1 Non-native species. Beckmania syzigachne is native to Oregon. Native species are preferred.
2 Scirpus tubers must be planted shallower for establishment, and protected from foraging waterfowl until established.
Emerging aerial stems should project above water surface to allow oxygen transport to the roots.
Primary sources: Municipality of Metropolitan Seattle, Water Pollution Control Aspects of Aquatic Plants, 1990.
Hortus Northwest, Wetland Plants for Western Oregon, Issue 2, 1991. Hitchcock and Cronquist, Flora of the Pacific
Northwest, 1973.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 707
8.2.1.11 Construction Criteria:
• Remove sediment that has accumulated in the pond after construction in the
drainage area of the pond is complete (unless used for a liner - see below).
• Sediment that has accumulated in the pond at the end of construction may be used
as a liner in excessively drained soils if the sediment meets the criteria for low
permeability or treatment liners in keeping with guidance given in Chapter 3.
Sediment used for a soil liner must be graded to provide uniform coverage and must
meet the thickness specifications in Chapter 3. The sediment must not reduce the
design volume of the pond. The pond must be over-excavated initially to provide
sufficient room for the sediments to serve as a liner.
8.2.1.12 Operation and Maintenance:
• All private drainage systems serving multiple lots shall require a signed Stormwater
Easement and Maintenance agreement with the City. The agreement shall designate
the systems to be maintained and the parties responsible for maintenance. Contact
the City to determine the applicability of this requirement to a project. A specific
maintenance plan shall be formulated outlining the schedule and scope of
maintenance operations.
• The pond may be inspected by the City. The maintenance standards contained in
Volume I, Appendix D are measures for determining if maintenance actions are
required as identified through the annual inspection.
• Trim site vegetation as necessary to keep the pond free of leaves and to maintain
the aesthetic appearance of the site. Revegetate sloped areas that have become
bare and regrade eroded areas prior to revegetation.
• Remove sediment when the 1-foot sediment zone is full plus 6 inches. Dispose of
sediments in accordance with current local health department requirements and the
Minimum Functional Standards for Solid Waste Handling. See Volume IV, Appendix
D Recommendations for Management of Street Waste for further guidance.
• Any standing water removed during the maintenance operation must be properly
disposed of. The preferred disposal option is discharge to a sanitary sewer at an
approved location. Other disposal options include discharge back into the wetpool
facility or the storm sewer system if certain conditions are met. See Volume IV,
Appendix D for additional guidance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 708
8.2.2 BMP T1020 Wetvaults
8.2.2.1 Description:
A wetvault is an underground structure similar in appearance to a detention vault, except that a
wetvault has a permanent pool of water (wetpool) which dissipates energy and improves the settling
of particulate pollutants (see the wetvault details in Figure V-8-31). Being underground, the wetvault
lacks the biological pollutant removal mechanisms, such as algae uptake, present in surface
wetponds.
8.2.2.2 Applications and Limitations:
A wetvault may be used for commercial, industrial, or roadway projects if there are space limitations
precluding the use of other treatment BMPs. The use of wetvaults for residential development is
highly discouraged. Combined detention and wetpools are allowed; see BMP T1040.
If oil control is required for a project, a wetvault may be combined with an API oil/water separator.
8.2.2.3 Design Criteria:
Sizing Procedure
The wetpool volume for the wetvault shall be equal to or greater than the total volume of runoff from
the 6-month, 24-hour storm event. Alternatively, the 91st percentile, 24-hour runoff volume estimated
by WWHM may be used.
Typical design details and concepts for the wetvault are shown in Figure V-8-31.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 709
Figure V-8-31. Wetvault
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 710
8.2.2.4 Wetpool Geometry
Same as specified for wetponds (see BMP T1010) except for the following two modifications:
• The sediment storage in the first cell shall be an average of 1-foot. Because of the
v-shaped bottom, the depth of sediment storage needed above the bottom of the
side wall is roughly proportional to vault width according to the schedule below:
Vault Width Sediment Depth
(from bottom of side wall)
15’ 10”
20’ 9”
40’ 6”
60’ 4”
• The second cell shall be a minimum of 3 feet deep since planting cannot be used to
prevent re-suspension of sediment in shallow water as it can in open ponds.
8.2.2.5 Vault Structure
• Separate the vault into two cells by a wall or a removable baffle. If a wall is used,
provide a 5-foot by 10-foot removable maintenance access for both cells. If a
removable baffle is used, the following criteria apply:
o The baffle shall extend from a minimum of 1-foot above the WQ design water
surface to a minimum of 1-foot below the invert elevation of the inlet pipe.
o The lowest point of the baffle shall be a minimum of 2 feet from the bottom of
the vault, and greater if feasible.
• If the vault is less than 2,000 cubic feet (inside dimensions), or if the length-to-width
ratio of the vault pool is 5:1 or greater, the baffle or wall may be omitted and the vault
may be one-celled.
• Do not divide the two cells of a wetvault into additional subcells by internal walls. If
internal structural support is needed, it is preferred that post and pier construction be
used to support the vault lid rather than walls. Any walls used within cells must be
positioned so as to lengthen, rather than divide, the flowpath.
• Slope the bottom of the first cell toward the access opening. Slope shall be between
0.5 percent (minimum) and 2 percent (maximum). The second cell may be level
(longitudinally) sloped toward the outlet, with a high point between the first and
second cells. Sloping the second cell towards the access opening for the first cell is
also acceptable. Alternatively, access openings may be positioned a maximum of
10 feet from any location within the vault.
• Slope the vault bottom laterally a minimum of 5 percent from each side towards the
center, forming a broad "v" to facilitate sediment removal. Note: More than one "v"
may be used to minimize vault depth.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 711
The City may allow the vault bottom to be flat if removable panels are provided over the entire
vault. Removable panels shall be at grade, have stainless steel lifting eyes, and weigh no
more than 5 tons per panel.
• The highest point of a vault bottom must be at least 6 inches below the outlet
elevation to provide for sediment storage over the entire bottom.
• Evaluate buoyancy of the vault with the results presented in design documentation.
• Wetvaults may be constructed using arch culvert sections provided the top area at
the WQ design water surface is, at a minimum, equal to that of a vault with vertical
walls designed with an average depth of 6 feet.
• Wetvaults shall conform to the "Materials" and "Structural Stability" criteria specified
for detention vaults in Volume III, Section 2.3.3.
• Where pipes enter and leave the vault below the WQ design water surface, they
shall be sealed using water tight seals or couplers.
• Galvanized materials shall not be used unless coated.
8.2.2.6 Inlet and Outlet
• Submerge the inlet to the wetvault. The inlet pipe invert shall be a minimum of 3 feet
from the vault bottom. Submerge the top of the inlet pipe at least 1-foot, if possible.
• Unless designed as an off-line facility, the capacity of the outlet pipe and available
head above the outlet pipe shall be designed to convey the 100-year design flow for
developed site conditions without overtopping the vault. The available head above
the outlet pipe must be a minimum of 6 inches.
• The outlet pipe shall be back-sloped or have tee section, the lower arm of which shall
extend 1 foot below the WQ design water surface to provide for trapping of oils and
floatables in the vault.
• Center the inlet and outlet pipes over the “V” portion of the vault.
8.2.2.7 Access Requirements
Same as for detention vaults (see Volume III, Section 2.3.3), except for the following additional
requirement for wetvaults:
• Provide a minimum of 50 square feet of grate over the second cell. For vaults in
which the surface area of the second cell is greater than 1,250 square feet, grate
4 percent of the top. This requirement may be met by one grate or by many smaller
grates distributed over the second cell area.
Note: A grated access door can be used to meet this requirement.
8.2.2.8 Access Roads, Right of Way, and Setbacks
Same as for detention vaults (see Volume III, Section 2.3.3).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 712
8.2.2.9 Recommended Design Features
The following design features should be incorporated into wetvaults where feasible, but they are not
specifically required:
• The floor of the second cell should slope toward the outlet for ease of cleaning.
• The inlet and outlet should be at opposing corners of the vault to increase the
flowpath.
• A flow length-to-width ratio greater than 3:1 minimum is desirable.
• Lockable grates instead of solid manhole covers are recommended to increase air
contact with the wetpool.
• The number of inlets to the wetvault should be limited, and the flowpath length
should be maximized from inlet to outlet for all inlets to the vault.
8.2.2.10 Construction Criteria
Remove sediment that has accumulated in the vault after construction in the drainage area is
complete.
8.2.2.11 Operation and Maintenance
• Vault maintenance procedures must meet OSHA confined space entry requirements,
which include clearly marking entrances to confined space areas.
• Facilities may be inspected by the City. The maintenance standards contained in
Volume I, Appendix D are measures for determining if maintenance actions are
required as identified through the inspection.
• Remove sediment when the 1-foot sediment zone is full plus 6 inches. Test
sediments for toxicants in compliance with current disposal requirements. Dispose of
sediments in accordance with current local health department requirements and the
Minimum Functional Standards for Solid Waste Handling. See Volume IV,
Appendix D Recommendations for Management of Street Waste for additional
guidance.
• Dispose of any standing water removed during the maintenance operation. The
preferred disposal option is discharge to a sanitary sewer at an approved location.
Other disposal options include discharge back into the wetpool facility or the storm
sewer system if certain conditions are met. See Volume IV, Appendix D for additional
guidance.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 713
8.2.2.12 Modifications for Combining with a Baffle Oil/Water Separator
If the project site is a high-use site and a wetvault is proposed, the vault may be combined with a
baffle oil/water separator to meet the runoff treatment requirements with one facility rather than two.
• The sizing procedures for the baffle oil/water separator (Chapter 9) shall be run as a
check to ensure the vault is large enough. If the oil/water separator sizing procedures
result in a larger vault size, increase the wetvault size to match.
• An oil retaining baffle shall be provided in the second cell near the vault outlet. The
baffle shall not contain a high-flow overflow, or else the retained oil will be washed
out of the vault during large storms.
• The vault shall have a minimum length-to-width ratio of 5:1.
• The vault shall have a design water depth-to-width ratio of between 1:3 and 1:2.
• The vault shall be watertight and shall be coated to protect from corrosion.
• Separator vaults shall have a shutoff mechanism on the outlet pipe to prevent oil
discharges during maintenance and to provide emergency shut-off capability in case
of a spill. Also, provide a valve box and riser.
• Wetvaults used as oil/water separators must be off-line and must bypass flows
greater than the off-line WQ design flow multiplied by 3.5. This will minimize the
entrainment and/or emulsification of previously captured oil during very high flow
events.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 714
8.2.3 BMP T1030 Stormwater Treatment Wetlands
8.2.3.1 Description
Stormwater treatment wetlands are shallow man-made ponds that are designed to treat stormwater
through the biological processes associated with emergent aquatic plants (see the stormwater
wetland details in Figure V-8-32 and Figure V-8-33).
Wetlands created to mitigate disturbance impacts, such as filling of wetlands, shall not be used as
stormwater treatment facilities.
8.2.3.2 Applications and Limitations
The most critical factor for a successful design is the provision of an adequate supply of water for
most of the year. Since water depths are shallower than in wetponds, water loss by evaporation is an
important concern. Stormwater wetlands are a good WQ facility choice in areas with high winter
groundwater levels.
8.2.3.3 Design Criteria
Stormwater wetlands use most of the same design criteria as wetponds (see above). However,
instead of gravity settling being the dominant treatment process, pollutant removal mediated by
aquatic vegetation and the microbiological community associated with that vegetation becomes the
dominant treatment process. Thus when designing wetlands, water volume is not the dominant
design criteria. Rather, factors which affect plant vigor and biomass are the primary concerns.
8.2.3.4 Sizing Procedure
1. The design volume is the total volume of runoff from the 6-month, 24-hour storm event or,
alternatively, the 91st percentile, 24-hour runoff volume using WWHM.
2. Calculate the surface area of the stormwater wetland. The surface area of the wetland shall
be the same as the top area of a wetpond sized for the same site conditions. Calculate the
surface area of the stormwater wetland by using the volume from Step 1 and dividing by the
average water depth (use 3 feet).
3. Determine the surface area of the first cell of the stormwater wetland. Use the volume
determined from Criterion 2 under "Wetland Geometry", below, and the actual depth of the
first cell.
4. Determine the surface area of the wetland cell. Subtract the surface area of the first cell
(Step 3) from the total surface area (Step 2).
5. Determine water depth distribution in the second cell. Decide if the top of the dividing berm
will be at the surface or submerged (designer's choice). Adjust the distribution of water depths
in the second cell according to Step 8 in Section 8.2.3.5. This will result in a facility that holds
less volume than that determined in Step 1 above. This is acceptable.
6. Choose plants. See Table V-8-15 for a list of plants recommended for wetpond water depth
zones, or consult a wetland scientist.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 715
8.2.3.5 Wetland Geometry
1. Stormwater wetlands shall consist of two cells, a presettling cell and a wetland cell.
2. The presettling cell shall contain approximately 33 percent of the wetpool volume
calculated in Step 1 above.
3. The depth of the presettling cell shall be between 4 feet (minimum) and 8 feet
(maximum), excluding sediment storage.
4. Provide one-foot of sediment storage in the presettling cell.
5. The wetland cell shall have an average water depth of about 1.5 feet (plus or minus
3 inches).
6. Shape the "berm" separating the two cells such that its downstream side gradually
slopes to form the second shallow wetland cell (see the section view in Figure V-8-
32). Alternatively, the second cell may be graded naturalistically from the top of the
dividing berm (see Step 8 below).
7. The top of the berm shall be either at the WQ design water surface or submerged
1 foot below the WQ design water surface. Correspondingly, the side slopes of the
berm must meet the following criteria:
a. If the top of berm is at the WQ design water surface, the berm side slopes
shall be no steeper than 3H:1V.
b. If the top of berm is submerged 1-foot, the upstream side slope may be up to
2H:1V.
8. Grade the bottom of the wetland cell in one of two ways:
a. Shallow evenly graded slope from the upstream to the downstream edge of the
wetland cell (see Figure V-8-32).
b. A "naturalistic" alternative, with the specified range of depths intermixed
throughout the second cell (see Figure V-8-33). A distribution of depths shall be
provided in the wetland cell depending on whether the dividing berm is at the
water surface or submerged (see Table V-8-16).
The maximum depth shall be 2.5 feet in either configuration.
8.2.3.6 Lining Requirements
In infiltrative soils, line both cells of the stormwater wetland. To determine whether a low-permeability
liner or a treatment liner is required, determine whether the following conditions will be met. If soil
permeability will allow sufficient water retention, lining may be waived.
1. The second cell must retain water for at least 10 months of the year.
2. The first cell must retain at least three feet of water year-round.
SURFACE WATER MANAGE MENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 716
3. Use a complete precipitation record when establishing these conditions. Take into
account evapo-transpiration losses as well as infiltration losses. Many wetland plants
can adapt to periods of summer drought, so a limited drought period is allowed in the
second cell. This may allow a treatment liner rather than a low permeability liner to be
used for the second cell. The first cell must retain water year-round in order for the
presettling function to be effective.
4. If a low permeability liner is used, place a minimum of 18 inches of native soil amended
with good topsoil or compost (one part compost mixed with 3 parts native soil) over the
liner. For geomembrane liners, a soil depth of 3 feet is recommended to prevent damage
to the liner during planting. Hydric soils are not required.
The criteria for liners given in Chapter 3 must be observed.
8.2.3.7 Inlet and Outlet
Same as for wetponds (see BMP T1010).
8.2.3.8 Access and Setbacks
Location of the stormwater wetland relative to site constraints (e.g., buildings, property
lines, etc.) shall be the same as for detention ponds (see Volume III). See Chapter 3 for
typical setback requirements for WQ facilities.
Provide access and maintenance roads and design them according to the requirements
for detention ponds (see Volume III). Extend access and maintenance roads shall to
both the wetland inlet and outlet structures. Provide an access ramp (7H minimum:1V) to
the bottom of the first cell unless all portions of the cell can be reached and sediment
loaded from the top of the wetland side slopes.
The internal berm of a stormwater treatment wetland may be used for access if it is
designed to support a loaded 80,000 pound truck considering the berm is normally
submerged and saturated.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 717
Figure V-8-32. Stormwater Wetland – Option 1
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 718
Figure V-8-33. Stormwater Wetland – Option 2
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 719
Table V-8-16. Distribution of Depths in Wetland Cell
Dividing Berm at WQ Design Water Surface Dividing Berm Submerged 1-Foot
Depth Range (feet) Percent Depth Range (feet) Percent
0.1 to 1 25 1 to 1.5 40
1 to 2 55 1.5 to 2 40
2 to 2.5 20 2 to 2.5 20
8.2.3.9 Planting Requirements
Plant the wetland cell with emergent wetland plants following the recommendations given in Table V-
8-15 or the recommendations of a wetland specialist. Cattails (Typha latifolia) are not allowed.
8.2.3.10 Construction Criteria
• Construction and maintenance considerations are the same as for wetponds.
• Construction of the naturalistic alternative (Option 2) can be accomplished by first
excavating the entire area to the 1.5-foot average depth. Then soil subsequently
excavated to form deeper areas can be deposited to raise other areas until the
distribution of depths indicated in the design is achieved.
8.2.3.11 Operation and Maintenance
• Inspect wetlands at least twice per year during the first three years during both
growing and non-growing seasons to observe plant species presence, abundance,
and condition; bottom contours and water depths relative to plans; and sediment,
outlet, and buffer conditions.
• Schedule maintenance around sensitive wildlife and vegetation seasons.
• Plants may require watering, physical support, mulching, weed removal, or replanting
during the first three years.
• Remove nuisance plant species and replant desirable species.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 720
8.2.4 BMP T1040 Combined Detention and Wetpool Facilities
8.2.4.1 Description:
Combined detention and WQ wetpool facilities have the appearance of a detention facility but contain
a permanent pool of water as well. The following design procedures, requirements, and
recommendations cover differences in the design of the stand-alone WQ facility when combined with
detention storage. The following combined facilities are addressed:
• Detention/wetpond (basic and large)
• Detention/wetvault
• Detention/stormwater wetland.
There are two sizes of the combined wetpond, a basic and a large, but only a basic size for the
combined wetvault and combined stormwater wetland. The facility sizes (basic and large) are related
to the pollutant removal goals. See Chapter 3 for more information about treatment performance
goals.
8.2.4.2 Applications and Limitations:
Combined detention and water quality facilities are efficient for sites that also have detention
requirements. The water quality facility may often be placed beneath the detention facility without
increasing the facility surface area. However, the fluctuating water surface of the live storage will
create unique challenges for plant growth and for aesthetics alike.
The live storage component of the facility shall be provided above the seasonal high water table.
8.2.4.3 Design Criteria:
Typical design details and concepts for a combined detention and wetpond are shown in Figure V-8-
34 and Figure V-8-35. The detention portion of the facility shall meet the design criteria and sizing
procedures set forth in Volume III.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 721
Figure V-8-34. Combined Detention and Wetpond (top view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 722
Figure V-8-35. Combined Detention and Wetpond (side view)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 723
8.2.4.4 Sizing
The sizing for combined detention and wetponds are identical to those for wetponds and for detention
facilities. The wetpool volume for a combined facility shall be equal to or greater than the total volume
of runoff from the 6-month, 24-hour storm event or the 91st percentile 24-hour runoff volume
estimated by WWHM. Follow the standard procedure specified in Volume III to size the detention
portion of the pond.
8.2.4.5 Detention and Wetpool Geometry
• Do not include the wetpool and sediment storage volumes in the required detention
volume.
• The "Wetpool Geometry" criteria for wetponds (see BMP T1010) shall apply with the
following modifications/clarifications:
o The permanent pool may be shallower to comprise most of the pond bottom,
or deeper positioned to comprise a limited portion of the bottom. Note, having
the first wetpool cell at the inlet allows for more efficient sediment
management than if the cell is moved away from the inlet. Wetpond criteria
governing water depth must still be met. See Figure V-8-36 for two
possibilities for wetpool cell placement.
o The minimum sediment storage depth in the first cell is 1-foot. The 6 inches
of sediment storage required for a detention pond does not need to be added
to this, but 6 inches of sediment storage must be added to the second cell to
comply with the detention sediment storage requirement.
8.2.4.6 Berms, Baffles and Slopes
Same as for wetponds (see BMP T1010)
8.2.4.7 Inlet and Outlet
The Inlet and Outlet criteria for wetponds shall apply with the following modifications:
• Provide a sump in the outlet structure of combined ponds.
• Design the detention flow restrictor and its outlet pipe according to the requirements
for detention ponds (see Volume III).
8.2.4.8 Access and Setbacks
The same as for wetponds.
8.2.4.9 Planting Requirements
The same as for wetponds.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 724
8.3 Combined Detention and Wetvault
The sizing procedure for combined detention and wetvaults is identical to those outlined for wetvaults
and for detention facilities. The design criteria for detention vaults and wetvaults must both be met,
except for the following modifications or clarifications:
• The minimum sediment storage depth in the first cell shall average 1-foot. The
6 inches of sediment storage required for detention vaults do not need to be added
to this, but 6 inches of sediment storage must be added to the second cell to comply
with detention vault sediment storage requirements.
• The oil retaining baffle shall extend a minimum of 2 feet below the WQ design water
surface.
• If a vault is used for detention as well as water quality control, the facility may not be modified
to function as a baffle oil/water separator as allowed for wetvaults in BMP T1020.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 725
Figure V-8-36. Alternative Configurations of Detention and Wetpool Areas
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Wetpool Facilities Volume V
Chapter 8 726
8.4 Combined Detention and Stormwater Wetland
8.4.1 Sizing Criteria
The sizing procedure for combined detention and stormwater wetlands is identical to those outlined
for stormwater wetlands and for detention facilities. Follow the procedure specified in BMP T1030 to
determine the stormwater wetland size. Follow the standard procedure specified in Volume III to size
the detention portion of the wetland.
Water Level Fluctuation Restrictions: The difference between the WQ design water surface and the
maximum water surface associated with the 2-year runoff shall not be greater than 3 feet. If this
restriction cannot be met, the size of the stormwater wetland must be increased. The additional area
may be placed in the first cell, second cell, or both. If placed in the second cell, the additional area
need not be planted with wetland vegetation or counted in calculating the average depth.
8.4.2 Design Criteria
The design criteria for detention ponds and stormwater wetlands must both be met, except for the
following modifications or clarifications The Wetland Geometry criteria for stormwater wetlands (see
BMP T1030) shall be modified as follows:
• The minimum sediment storage depth in the first cell is 1-foot. The 6 inches of
sediment storage required for detention ponds does not need to be added to this, nor
does the 6 inches of sediment storage in the second cell of detention ponds need to
be added.
8.4.3 Inlet and Outlet Criteria
The Inlet and Outlet criteria for wetponds shall apply with the following modifications:
• Provide a sump in the outlet structure of combined facilities.
• Design the detention flow restrictor and its outlet pipe according to the requirements
for detention ponds (see Volume III).
8.4.4 Planting Requirements
The Planting Requirements for stormwater wetlands are modified to use the following plants which
are better adapted to water level fluctuations:
Scirpus acutus (hardstem bulrush) 2 - 6' depth
Scirpus microcarpus (small-fruited bulrush) 1 - 2.5' depth
Sparganium emersum (burreed) 1 - 2' depth
Sparganium eurycarpum (burreed) 1 - 2' depth
Veronica sp. (marsh speedwell) 0 - 1' depth
In addition, the shrub Spirea douglasii (Douglas spirea) may be used in combined facilities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 727
Chapter 9 Oil and Water Separators
9.1 Purpose
Oil and water separators remove oil and other water-insoluble hydrocarbons and settleable solids
from stormwater runoff. This chapter provides a discussion of their application and design criteria.
Best Management Practices (BMPs) are described for baffle type and coalescing plate separators.
9.2 Description
Oil and water separators are typically the American Petroleum Institute (API) (also called baffle type)
(American Petroleum Institute, 1990) or the coalescing plate (CP) type using a gravity mechanism for
separation. See Figure V-9-37 and Figure V-9-38. Oil and water separators typically consist of three
bays; forebay, separator section, and the afterbay. The CP separators need considerably less space
for separation of the floating oil due to the shorter travel distances between parallel plates. A spill
control (SC) separator (Figure V-9-39) is a simple catch basin with a T-inlet for temporarily trapping
small volumes of oil. The spill control separator is included here for comparison only and is not
designed for, or to be used for, treatment purposes.
9.3 Applications/Limitations
The following are potential applications of oil and water separators where free oil is expected to be
present at treatable high concentrations and sediment will not overwhelm the separator.
• Commercial and industrial areas including petroleum storage yards, vehicle
maintenance facilities, manufacturing areas, airports, utility areas (water, electric,
gas), and fueling stations. (King County Surface Water Management, 2005).
• Facilities that would require oil control BMPs under the high-use site threshold
described in Chapter 2 including parking lots at convenience stores, fast food
restaurants, grocery stores, shopping malls, discount warehouse stores, banks, truck
fleets, auto and truck dealerships, and delivery services. (King County Surface Water
Management, 2005).
For low concentrations of oil, other treatments may be more applicable. These include sand filters
and emerging technologies.
Without intense maintenance oil/water separators may not be sufficiently effective in achieving oil and
TPH removal down to required levels.
Pretreatment should be considered if the level of total suspended solids (TSS) in the inlet flow would
cause clogging or otherwise impair the long-term efficiency of the separator.
For inflows from small drainage areas (fueling stations, maintenance shops, etc.) a coalescing plate
(CP) type separator is typically considered, due to space limitations. However, if plugging of the
plates is likely, then a new design basis for the baffle type API separator may be considered on an
experimental basis (see Section 9.6).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 728
Figure V-9-37. API (Baffle Type) Separator
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 729
Figure V-9-38. Coalescing Plate Separator
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 730
Source: 1992 Ecology Manual
Figure V-9-39. Spill Control Separator (not for oil treatment)
9.4 Site Suitability
Consider the following site characteristics:
• Sufficient land area
• Adequate TSS control or pretreatment capability
• Compliance with environmental objectives
• Adequate influent flow attenuation and/or bypass capability
• Sufficient access for operation and maintenance (O&M)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 731
9.5 Design Criteria
9.5.1 General Considerations
The following are design criteria applicable to API and CP oil/water separators:
• If practicable, determine oil/grease (or TPH) and TSS concentrations, lowest
temperature, pH, empirical oil rise rates in the runoff, and the viscosity and specific
gravity of the oil. Also determine whether the oil is emulsified or dissolved.
(Washington State Department of Ecology, 2005) Do not use oil/water separators for
the removal of dissolved or emulsified oils such as coolants, soluble lubricants,
glycols, and alcohols.
• Locate the separator off-line and bypass the incremental portion of flows that exceed
the off-line 15-minute water quality design flow rate multiplied by 3.5. If it is
necessary to locate the separator on-line, try to minimize the size of the area
needing oil control, and use the on-line water quality design flow rate multiplied by
2.0.
• Use only storm drain pipes or impervious conveyances for routing oil contaminated
stormwater to the oil and water separator.
• Specify appropriate performance tests after installation and shakedown, and/or
certification by a professional engineer that the separator is functioning in
accordance with design objectives. Expeditious corrective actions must be taken if it
is determined that the separator is not achieving acceptable performance levels.
• Add pretreatment for TSS that could clog the separator, or otherwise impair the long-
term effectiveness of the separator.
• All piping entering and leaving the separator must be six inches (6”) minimum
diameter.
• If a pump mechanism is required to convey the discharge from the site to the
sanitary sewer system, the pump must be designed to discharge to a controlled
gravity outlet flow into the City system.
• Access points in the top of the vault must be provided to allow a minimum twelve-
inch (12”) diameter access for observation and maintenance to all chambers of the
separator.
• Access doors as applicable, should be galvanized spring-assisted diamond plate
with a penta-head bolt-locking latch and recessed lift handle.
• Doors must open a full one hundred and eighty degrees (180º).
• Access to the separator shall be maintained free for inspection at all times.
9.5.2 Criteria for Separator Bays
• Size the separator bay for the off-line 15-minute water quality design flow rate
predicted by WWHM multiplied by 3.5.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 732
• To collect floatables and settleable solids, design the surface area of the forebay at
20 ft² per 10,000 ft² of area draining to the separator. The length of the forebay
shall be 1/3-1/2 of the length of the entire separator. Include roughing screens for the
forebay or upstream of the separator to remove debris, if needed. Screen openings
shall be about 3/4 inch.
• Include a submerged inlet pipe with a down-turned elbow in the first bay at least
two feet from the bottom. The outlet pipe shall be a Tee, sized to pass the design
peak flow and placed at least 12 inches below the water surface.
• Include a shutoff mechanism at the separator outlet pipe.
• Use absorbents and/or skimmers in the afterbay as needed.
9.5.3 Criteria for Baffles
• Oil retaining baffles (top baffles) shall be located at least 1/4 of the total separator
length from the outlet and shall extend down at least 50% of the water depth and at
least 1 foot from the separator bottom.
• Baffle height to water depth ratios shall be 0.85 for top baffles and 0.15 for bottom
baffles.
9.6 Oil and Water Separator BMPs
Two BMPs are described in this section:
• BMP T1110 for baffle type separators
• BMP T1111 for coalescing plate separators
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 733
9.6.1 BMP T1110 API (Baffle type) Separator Bay
9.6.1.1 Design Criteria
The criteria for small drainages is based on Vh, Vt, residence time, width, depth, and length
considerations. As a correction factor API's turbulence criteria is applied to increase the length.
9.6.1.2 Sizing Criteria
• Determine the oil rise rate, Vt, in cm/sec, using Stokes’ Law, or empirical
determination, or 0.033 ft./min. for 60µ (micron) oil droplet size. The application of
Stokes’ Law to site-based oil droplet sizes and densities, or empirical rise rate
determinations recognizes the need to consider actual site conditions. In those cases
the design basis would not be the 60 micron droplet size and the 0.033 ft/min. rise
rate.
Stokes Law equation for rise rate, Vt (cm/sec):
Vt = [(g)(w – o)(d²)] / [(18*w)]
Where:
Vt = the rise rate of the oil droplet (cm/s or ft/sec)
g = acceleration due to gravity (cm/s² or ft/s²)
w = density of water at the design temperature (g/cm³ or lbm/ft³)
o = density of oil at the design temperature (g/cm³ or lbm/ft³)
d = oil droplet diameter (cm or ft)
w = absolute viscosity of the water (g/cm s or lbm/ft s)
Use:
oil droplet diameter, D=60 microns (0.006 cm)
w =0.999 g/cm³ at 32° F
o: Select conservatively high oil density,
For example, if diesel oil @ o =0.85 g/cm³ and motor oil @ o = 0.90 can be present then
use o =0.90 g/cm³
w = 0.017921 poise, gm/cm-sec. at Tw=32 °F
Use the following separator dimension criteria:
o Separator water depth, 3 d 8 feet (to minimize turbulence)
o Separator width, 6-20 feet
o Depth/width (d/w) of 0.3-0.5
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 734
For Stormwater Inflow from Drainages under 2 Acres
Ecology modified the API criteria for treating stormwater runoff from small drainage areas (fueling
stations, commercial parking lots, etc.) by using the design hydraulic horizontal velocity, Vh, for the
design Vh/Vt ratio rather than the API minimum of Vh/Vt = 15. The API criteria appear applicable for
greater than two acres of impervious drainage area.
Performance verification of this design basis must be obtained during at least one wet
season using the test protocol referenced in Chapter 10 for new technologies.
The following is the sizing procedure using modified API criteria:
1. Determine Vt and select depth and width of the separator section based on above criteria.
2. Calculate the minimum residence time (tm) of the separator at depth d:
tm = d/Vt
3. Calculate the horizontal velocity of the bulk fluid, Vh, vertical cross-sectional area, Av, and
actual design Vh/Vt.
Vh = Q/dw = Q/Av (Vh maximum at < 2.0 ft/min.)
Q = (k) . Use a value of 3.5 for K for the site location multiplied by the off-line 15 minute
water quality design flow rate in ft³/min determined by WWHM, at minimum residence
time, tm
At Vh/Vt determine F, turbulence and short-circuiting factor API F factors range from
1.28-1.74 (see Appendix D).
4. Calculate the minimum length of the separator section, l(s), using:
l(s) = FQtm/wd = F(Vh/Vt)d
l(t) = l(f) + l(s) +l(a)
l(t) = l(t)/3 + l(s) + l(t)/4
Where:
l(t) = total length of 3 bays
l(f) = length of forebay
l(a) = length of afterbay
5. Calculate V = l(s)wd = FQtm, and Ah = wl(s)
V = minimum hydraulic design volume
Ah = minimum horizontal area of the separator
For Stormwater Inflow from Drainages > 2 Acres:
Use Vh = 15 Vt and d = (Q/2Vh)¹/² (with d/w = 0.5) and repeat above calculations 3-5.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 735
9.6.2 BMP T1111 Coalescing Plate (CP) Separator Bay
9.6.2.1 Design Criteria
Calculate the projected (horizontal) surface area of plates needed using the following equation:
Ah = Q/Vt = [Q] / [(0.00386) * ((Sw - So)/(w))]
Where
Ah = horizontal surface area of the plates (ft²)
Vt = rise rate of the oil droplet (ft/min)
Q = design flowrate (ft³/min) The design flowrate is the off-line 15-minute
water quality design flowrate predicted by WWHM multiplied by 3.5.
Sw = specific gravity of water at the design temperature
So = specific gravity of oil at the design temperature
w = absolute viscosity of the water (poise)
• Plate spacing shall be a minimum of 3/4 inches (perpendicular distance between
plates).
• Select a plate angle between 45° to 60° from the horizontal.
• Locate plate pack at least 6 inches from the bottom of the separator for sediment
storage.
• Add 12 inches minimum head space from the top of the plate pack and the bottom of
the vault cover.
• Design inlet flow distribution and baffles in the separator bay to minimize turbulence,
short-circuiting, and channeling of the inflow especially through and around the plate
packs of the CP separator. The Reynolds Number through the separator bay shall be
<500 (laminar flow).
• Include forebay for floatables and afterbay for collection of effluent.
• The sediment-retaining baffle must be upstream of the plate pack at a minimum
height of 18 in.
• Design plates for ease of removal, and cleaning with high-pressure rinse or
equivalent.
9.6.2.2 Operation and Maintenance
• Prepare, regularly update, and implement an O & M Manual for the oil/water
separators.
• Inspect oil/water separators monthly during the wet season of October 1-April 30
(WEF & ASCE, 1998) to ensure proper operation, and, during and immediately after
a large storm event of 1 inch per 24 hours.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Oil and Water Separators Volume V
Chapter 9 736
• Clean oil/water separators regularly to keep accumulated oil from escaping during
storms. They must be cleaned by October 15 to remove material that has
accumulated during the dry season, after all spills, and after a significant storm.
Coalescing plates may be cleaned in-situ or after removal from the separator. An
eductor truck may be used for oil, sludge, and washwater removal. Replace wash
water in the separator with clean water before returning it to service.
• Remove the accumulated oil when the thickness reaches 1-inch. Also remove sludge
deposits when the thickness reaches 6 inches.
• Replace oil absorbent pads before their sorbed oil content reaches capacity.
• Train designated employees on appropriate separator operation, inspection, record
keeping, and maintenance procedures.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Emerging Technologies Volume V
Chapter 10 737
Chapter 10 Emerging Technologies
10.1 Background
Traditional best management practices (BMPs) such as wetponds and filtration swales may not be
appropriate in many situations due to size and space restraints or their inability to remove target
pollutants. Because of this, the stormwater treatment industry emerged and new stormwater
treatment devices are currently in development.
Emerging technologies are those new stormwater treatment devices that are continually being added
to the stormwater treatment marketplace. These devices include both permanent and construction
site treatment technologies. Many of these devices have not undergone complete performance
testing so their performance claims cannot be verified.
10.2 Emerging Technology and the City of Auburn
Typically devices with general use level designation (GULD) will be accepted for private stormwater
treatment. Devices with GULD status may be accepted in the right-of-way with preapproval.
10.3 Ecology Role in Evaluating Emerging Technologies
To aid local governments in selecting new stormwater treatment technologies the Department of
Ecology (Ecology) developed the Technology Assessment Protocol – Ecology (TAPE) and Chemical
Technology Assessment Protocol Ecology (CTAPE) protocols. These protocols provide
manufacturers with guidance on stormwater monitoring so they may verify their performance claims.
As a part of this process Ecology:
• Posts information on emerging technologies at the emerging technologies website:
http://www.ecy.wa.gov/programs/wq/stormwater/newtech/index.html.
• Participates in all Technical Review Committee (TRC) and Chemical Technical
Review Committee (CTRC) activities which include reviewing manufacturer
performance data and providing recommendations on use level designations.
• Grants use level designations based on performance and other pertinent data
submitted by the manufacturers and vendors.
• Provides oversight and analysis of all submittals to ensure consistency with this
manual.
10.4 Evaluation of Emerging Technologies
Local governments should consider the following as they make decisions concerning the use of new
stormwater treatment technologies in their jurisdiction:
Remember the Goal:
The goal of any stormwater management program or BMP is to treat and release stormwater in a
manner that does not harm beneficial uses.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Emerging Technologies Volume V
Chapter 10 738
Exercise Reasonable Caution:
Before allowing a new technology for an application, the local government should review evaluation
information based on the TAPE or CTAPE.
An emerging technology cannot be used for new or redevelopment unless this technology has a use
level designation. Having a use level designation means that Ecology and the TRC or CTRC
reviewed system performance data and believe the technology has the ability to provide the level of
treatment claimed by the manufacturer.
To achieve the goals of the Clean Water Act and the Endangered Species Act, local governments
may find it necessary to retrofit stormwater pollutant control systems for many existing stormwater
discharges. In retrofit situations, the use of any BMP that makes substantial progress toward these
goals is a step forward and Ecology encourages this. To the extent practical, the performance of
BMPs used in retrofit situations should be evaluated using the TAPE or CTAPE protocols.
10.5 Assessing Levels of Development of Emerging Technologies
Ecology developed use level designations to assess levels of development for emerging
technologies. The use level designations are based upon the quantity, quality, and type of
performance data. There are three use level designations: pilot use level designation, conditional use
level designation, and general use level designation.
Pilot Use Level Designation (PULD)
For technologies that have limited performance data, the pilot use level designation allows limited use
to enable field testing to be conducted. Pilot use level designations may be given based solely on
laboratory performance data. Pilot use level designations apply for a specified time period only.
During this time period, the proponent must complete all field testing and submit a technology
evaluation report (TER) to Ecology and the TRC. Ecology will limit the number of installations to five
during the pilot use level period.
Local governments may allow PULD technologies to be installed if the manufacturer agrees to
conduct additional field testing based on the TAPE at all sites to obtain a general use level
designation. Local governments covered by a municipal stormwater NPDES permit must notify
Ecology in writing when a PULD technology is proposed. The form can be found:
http://www.ecy.wa.gov/programs/wq/stormwater/newtech/PULDNOI.pdf
Conditional Use Level Designation (CULD)
For emerging technologies that have considerable performance data that was not collected per the
TAPE protocol, the CULD was established. Conditional use level designations may be given if field
data has been collected by a protocol that is reasonably consistent but does not necessarily fully
meet the TAPE protocol. The field data must meet the statistical goals set out in the TAPE guidelines
Appendix D. Laboratory data may be used to supplement field data. Technologies that are granted a
CULD will be allowed continued use for a specified time period, during which the field testing
necessary to obtain a general use level designation (GULD) must be completed and a TER must be
submitted to Ecology and the TRC. Ecology will limit the number of installations to ten during the
CULD period.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Emerging Technologies Volume V
Chapter 10 739
General Use Level Designation (GULD)
The GULD confers a general acceptance for the specified applications (land uses). Technologies
with a GULD may be used anywhere in Washington, subject to Ecology conditions.
10.6 Examples of Emerging Technologies for Stormwater Treatment and
Control
Go to the Ecology Emerging Technologies website to obtain information on technologies that have
obtained a use level designation:
http://www.ecy.wa.gov/programs/wq/stormwater/newtech/index.html
THIS PAGE INTENTIONALLY LEFT BLANK.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Basic Treatment Receiving Waters Volume V
Appendix A 741
Appendix A Basic Treatment Receiving Waters
All Salt Waterbodies
Rivers Upstream Point for Exemption
Baker Anderson Creek
Bogachiel Bear Creek
Cascade Marblemount
Chehalis Bunker Creek
Clearwater Town of Clearwater
Columbia Canadian Border
Cowlitz Skate Creek
Elwha Lake Mills
Green Howard Hanson Dam
Hoh South Fork Hoh River
Humptulips West and East Fork Confluence
Kalama Italian Creek
Lewis Swift Reservoir
Muddy Clear Creek
Nisqually Alder Lake
Nooksack Glacier Creek
South Fork Nooksack Hutchinson Creek
North River Raymond
Puyallup Carbon River
Queets Clearwater River
Quillayute Bogachiel River
Quinault Lake Quinault
Sauk Clear Creek
Satsop Middle and East Fork Confluence
Skagit Cascade River
Skokomish Vance Creek
Skykomish Beckler River
Snohomish Snoqualmie River
Snoqualmie Middle and North Fork Confluence
Sol Duc Beaver Creek
Stillaguamish North and South Fork Confluence
North Fork Stillaguamish Boulder River
South Fork Stillaguamish Canyon Creek
Suiattle Darrington
Tilton Bear Canyon Creek
Toutle North and South Fork Confluence
North Fork Toutle Green River
Washougal Washougal
White Greenwater River
Wind Carson
Wynoochee Wishkah River Road Bridge
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Basic Treatment Receiving Waters Volume V
Appendix A 742
Lakes County
Washington King
Sammamish King
Union King
Whatcom Whatcom
Silver Cowlitz
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Procedure for Conducting a Volume V
Pilot Infiltration Test Appendix B 743
Appendix B Procedure for Conducting a Pilot
Infiltration Test
The Pilot Infiltration Test (PIT) consists of a relatively large-scale infiltration test to better approximate
infiltration rates for design of stormwater infiltration facilities. The PIT reduces some of the scale
errors associated with relatively small-scale double ring infiltrometer or “stove-pipe” infiltration tests. It
is not a standard test but rather a practical field procedure recommended by Ecology’s Technical
Advisory Committee.
Infiltration Test
1. Excavate the test pit to the depth of the bottom of the proposed infiltration facility. Lay
back the slopes sufficiently to avoid caving and erosion during the test.
2. The horizontal surface area of the bottom of the test pit should be approximately
100 square feet. For small drainages and where water availability is a problem smaller
areas may be considered as determined by the site professional.
3. Accurately document the size and geometry of the test pit.
4. Install a vertical measuring rod (minimum 5-ft. long) marked in half-inch increments in
the center of the pit bottom.
5. Use a rigid 6-inch diameter pipe with a splash plate on the bottom to convey water to the
pit and reduce side-wall erosion or excessive disturbance of the pond bottom. Excessive
erosion and bottom disturbance will result in clogging of the infiltration receptor and yield
lower than actual infiltration rates.
6. Add water to the pit at a rate that will maintain a water level between 3 and 4 feet above
the bottom of the pit. A rotometer can be used to measure the flow rate into the pit. A
water level of 3 to 4 feet provides for easier measurement and flow stabilization control.
However, the depth should not exceed the proposed maximum depth of water expected
in the completed facility.
7. Every 15-30 min, record the cumulative volume and instantaneous flow rate in gallons
per minute necessary to maintain the water level at the same point (between 3 and
4 feet) on the measuring rod.
8. Add water to the pit until one hour after the flow rate into the pit has stabilized (constant
flow rate) while maintaining the same pond water level (usually 17 hours).
9. After the flow rate has stabilized, turn off the water and record the rate of infiltration in
inches per hour from the measuring rod data, until the pit is empty.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Procedure for Conducting a Volume V
Pilot Infiltration Test Appendix B 744
Data Analysis
1. Calculate and record the infiltration rate in inches per hour in 30 minutes or one-hour
increments until one hour after the flow has stabilized.
NOTE: Use statistical/trend analysis to obtain the hourly flow rate when the flow stabilizes.
This would be the lowest hourly flow rate.
2. Apply appropriate correction factors for site heterogeneity, anticipated level of maintenance
and treatment to determine the site-specific design infiltration rate (see Table V-B-17).
Table V-B-17. Correction Factors to be Used with In-Situ Infiltration Measurements
to Estimate Long-Term Design Infiltration Rates
Issue Partial Correction Factor
Site variability and number of locations
tested
CFv = 1.5 to 6
Degree of long-term maintenance to prevent
siltation and bio-buildup
CFm = 2 to 6
Degree of influent control to prevent siltation
and bio-buildup
CFi = 2 to 6
Example
The area of the bottom of the test pit is 8.5-ft. by 11.5-ft.
Water flow rate was measured and recorded at intervals ranging from 15 to 30 minutes throughout
the test. Between 400 minutes and 1,000 minutes the flow rate stabilized between 10 and
12.5 gallons per minute or 600 to 750 gallons per hour, or an average of (9.8 + 12.3) / 2 =
11.1 inches per hour.
Applying a correction factor of 5.5 for gravelly sand, the design long-term infiltration rate becomes
2 inches per hour, anticipating adequate maintenance and pre-treatment.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Geotextile Specifications Volume V
Appendix C 745
Appendix C Geotextile Specifications
Table V-C-18. Geotextile Properties for Underground Drainage Survivability Properties
(WSDOT 2008 Standard Specifications or most current version)
Geotextile Property Requirements1
Low Survivability Moderate Survivability
Geotextile Property Test Method Woven/Nonwoven Woven/Nonwoven
Grab Tensile Strength,
min. in machine and
x-machine direction
ASTM D4632 180 lbs/115 lbs min. 250 lbs/160 lbs min.
Grab Failure Strain, in
machine and x-
machine direction
ASTM D4632 <50%/>50% <50%/>50%
Seam Breaking
Strength (if seams are
present)
ASTM D4632
and
160 lbs/100 lbs min. 220 lbs/140 lbs min.
Puncture Resistance ASTM D6241 370 lbs/220lbs min. 495 lbs/310 lbs min.
Tear Strength, min. in
machine and x-
machine direction
ASTM D4533 67 lbs/40 lbs min. 80 lbs/50 lbs min.
Ultraviolet (UV)
Radiation stability ASTM D4355
50% strength retained
min., after 500 hrs. in a
xenon arc device
50% strength retained
min., after 500 hrs. in a
xenon arc device
1 All geotextile properties are minimum average roll values (i.e., the test result for any sampled roll in a lot shall meet
or exceed the values shown in the table).
Table V-C-19. Geotextile for Underground Drainage Filtration Properties
(WSDOT 2008 Standard Specifications or most current version)
Geotextile Property Requirements1
Geotextile
Property Test Method Class A Class B Class C
AOS2 ASTM D4751 0.43 mm max.
(#40 sieve)
0.25 mm max.
(#60 sieve)
0.18 mm max.
(#80 sieve)
Water
Permittivity ASTM D4491 0.5 sec -1 min. 0.4 sec -1 min. 0.3 sec -1 min.
1 All geotextile properties are minimum average roll values (i.e., the test result for any sampled roll in a lot shall meet
or exceed the values shown in the table).
2 Apparent Opening Size (measure of diameter of the pores in the geotextile)
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Geotextile Specifications Volume V
Appendix C 746
Table V-C-20. Geotextile Strength Properties for Impermeable Liner Protection
Geotextile Property Test Method Geotextile Property Requirements1
Grab Tensile Strength, min. in
machine and x-machine direction ASTM D4632 250 lbs min.
Grab Failure Strain, in machine
and x-machine direction ASTM D4632 >50%
Seam Breaking Strength
(if seams are present)
ASTM D4632 and
ASTM D4884
(adapted for grab test)
220 lbs min.
Puncture Resistance ASTM D4833 125 lbs min.
Tear Strength, min. in machine
and x-machine direction ASTM D4533 90 lbs min.
Ultraviolet (UV) Radiation ASTM D4355 50% strength stability retained min.,
after 500 hrs. in weatherometer
1 All geotextile properties are minimum average roll values (i.e., the test result for any sampled roll in a lot shall meet
or exceed the values shown in the table).
Applications
1. For sand filter drain strip between the sand and the drain rock or gravel layers specify
Geotextile Properties for Underground Drainage, moderate survivability, Class A, from Table
V-C-18 and Table V-C-19 in the Geotextile Specifications.
2. For sand filter matting located immediately above the impermeable liner and below the
drains, the function of the geotextile is to protect the impermeable liner by acting as a
cushion. The specification provided in Table V-C-20 should be used to specify survivability
properties for the liner protection application. Table V-C-19, Class C should be used for
filtration properties. Only nonwoven geotextiles are appropriate for the liner protection
application.
3. For an infiltration drain specify Geotextile for Underground Drainage, low survivability,
Class C, from Table V-C-18 and Table V-C-19 in the Geotextile Specifications.
4. For a sand bed cover a geotextile fabric is placed exposed on top of the sand layer to trap
debris brought in by the stormwater and to protect the sand, facilitating easy cleaning of the
surface of the sand layer. However, a geotextile is not the best product for this application. A
polyethylene or polypropylene geonet would be better. The geonet material should have high
UV resistance (90% or more strength retained after 500 hours in the weatherometer,
ASTM D4355), and high permittivity (ASTM D4491, 0.8 sec. -1 or more) and percent open
area (CWO-22125, 10% or more). Tensile strength should be on the order of 200 lbs grab
(ASTM D4632) or more.
Courtesy of Tony Allen, Geotechnical Engineer-WSDOT
Reference for Tables 1 and 2: Section 9-33.2 “Geotextile Properties,” 1998 Standard Specifications for Road,
Bridge, and Municipal Construction
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Turbulence & Short-Circuiting Factor Volume V
Appendix D 747
Appendix D Turbulence and Short-Circuiting Factor
VH/VT Turbulence Factor (FT) F = 1.2 (FT)
20 1.45 1.74
15 1.37 1.64
10 1.27 1.52
6 1.14 1.37
3 1.07 1.28
Figure V-D-40. Recommended Values of F for Various Values of vH/Vt
THIS PAGE INTENTIONALLY LEFT BLANK.
Volume VI
i Table of Contents
Volume VI – Low-Impact
Development and On-Site
Stormwater Management
Table of Contents
Purpose of this Volume...................................................................................................................749
Content and Organization of this Volume.......................................................................................749
Chapter 1 General Requirements.....................................................................................750
1.1 Objectives..............................................................................................................................750
1.2 Site Assessment....................................................................................................................750
1.3 Site Planning and Layout.......................................................................................................750
1.4 Retain Native Vegetation.......................................................................................................751
1.5 Minimize Clearing and Grading Impacts...............................................................................751
Chapter 2 Low Impact Development Best Management Practices.................................752
2.1 Application.............................................................................................................................752
2.2 Best Management Practices..................................................................................................752
2.2.1 Dispersion and Soil Quality BMPs..................................................................................753
2.2.1.1 BMP L610 Downspout Dispersion........................................................................753
2.2.1.2 BMP L611 Concentrated Flow Dispersion............................................................759
2.2.1.3 BMP L612 Sheet Flow Dispersion........................................................................761
2.2.1.4 BMP L613 Post-Construction Soil Quality and Depth...........................................763
2.2.1.5 BMP L614 Full Dispersion.....................................................................................766
2.2.2 Site Design BMPs...........................................................................................................769
2.2.2.1 BMP L620 Preserving Natural Vegetation............................................................769
2.2.2.2 BMP L621 Better Site Design...............................................................................770
2.2.3 Low Impact Development BMPS....................................................................................771
2.2.3.1 BMP L630 Bioretention Areas (Rain Gardens).....................................................772
2.2.3.2 BMP L631 Vegetated Rooftops (Green Roofs).....................................................779
2.2.3.3 BMP L632 Rainfall Reuse Systems......................................................................780
2.2.3.4 BMP L633 Alternate Paving Surfaces...................................................................781
2.2.3.5 BMP L634 Minimal Excavation Foundations........................................................786
2.2.3.6 BMP L635 Reverse Slope Sidewalks....................................................................787
THIS PAGE INTENTIONALLY LEFT BLANK.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Purpose Volume VI
Content and Organization Introduction 749
Volume VI:
Low Impact Development and
On-Site Stormwater Management
Purpose of this Volume
This volume focuses on the concept of low impact development. Low impact development is a
stormwater management strategy that emphasizes conservation and use of existing natural site
features integrated with engineered, small-scale stormwater controls to more closely mimic
predevelopment hydrologic conditions. On-site stormwater management techniques are a key
component of low impact development.
All sites required to meet Minimum Requirement #5 must use dispersion and soil quality BMPs
described under on-site management below to the maximum extent practicable unless their use
would cause flooding or erosion impacts.
This section should be used in conjunction with “Low Impact Development: Technical Guidance
Manual for Puget Sound”, which can be found on the Puget Sound Partnership website:
www.psp.wa.gov/documents.html
Content and Organization of this Volume
Volume VI contains two chapters:
• Chapter 1 provides an overview of the general requirements for low impact
development.
• Chapter 2 provides detailed information pertaining to Best Management Practices
(BMPS) for low impact development.
Volume
VI
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements Volume VI
Chapter 1 750
Chapter 1 General Requirements
1.1 Objectives
The goal of low impact development is to manage stormwater generated from new development and
redevelopment on-site so there will be no negative impacts to adjacent or downstream properties and
no degradation to ground or surface waters.
The following are list of objectives for low impact design:
• Minimize the impacts of increased stormwater runoff from new development and
redevelopment by maintaining peak flow frequencies and durations of the site’s
undisturbed hydrologic condition.
• For residential projects, retain and/or restore 65% of the site’s native soils and
vegetation. For commercial projects, retain and/or restore 25% of the site’s native
soils and vegetation.
• Retain and incorporate natural site features that promote infiltration of stormwater on
the developed site.
• Utilize LID BMPs and minimize the use of traditional technologies to manage
stormwater quality and quantity.
• Manage stormwater as close to the source as possible.
1.2 Site Assessment
Before implementing LID practices it is necessary to perform a site assessment which includes an
assessment of both on-site and off-site conditions and features. See Chapter 2 of the “Low Impact
Development: Technical Guidance Manual for Puget Sound” for more information on steps for
performing a site assessment.
1.3 Site Planning and Layout
Sites should be configured to reduce impervious surfaces and utilize natural drainage features.
Chapter 3 of the “Low Impact Development: Technical Guidance Manual for Puget Sound” contains
information and techniques for site planning. City of Auburn codes must be adhered to.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
General Requirements Volume VI
Chapter 1 751
1.4 Retain Native Vegetation
Retain native vegetation to the maximum extent practicable in order to:
• Reduce total impervious surface coverage
• Provide infiltration areas for overland flows generated in adjacent developed portions
of the project
• Maintain the natural hydrology of the site.
See BMP L620 and Chapter 4 of “Low Impact Development: Technical Guidance Manual for Puget
Sound” for techniques on retaining native vegetation.
1.5 Minimize Clearing and Grading Impacts
• Conduct a soils analysis prior to clearing and grading to identify predevelopment soil
types and infiltration capabilities.
• Keep grading to a minimum by incorporating natural topography.
• Always use appropriate erosion and sediment control techniques when clearing and
grading. See Volume 2 of this manual for erosion and sediment control measures.
• Utilize techniques from Chapter 5 of “Low Impact Development: Technical Guidance
Manual for Puget Sound”.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 752
Chapter 2 Low Impact Development Best Management
Practices
This Chapter presents the methods for analysis and design of on-site stormwater management Best
Management Practices (BMPs). Design procedures and requirements for stormwater management
BMPs meeting Minimum Requirement #7, Flow Control, are contained in Volume 3.
2.1 Application
Most of the on-site BMPs serve to control runoff flow rate as well as to provide runoff treatment. Non-
pollution generating surfaces, such as rooftops and patios, may also use the infiltration BMPs
contained in Volume 3, which provide flow control only. Pollution generating surfaces, such as
driveways, small parking lots, and landscaping, must use on-site BMPs to provide some water quality
treatment.
The design criteria components in this manual must be used in order to obtain runoff credits. Runoff
credits are considered when determining project thresholds.
2.2 Best Management Practices
The following Low Impact Development BMPs are discussed in this Chapter:
2.2.1 Dispersion and Soil Quality BMPs
BMP L610 Downspout Dispersion
BMP L611 Concentrated Flow Dispersion
BMP L612 Sheet Flow Dispersion
BMP L613 Post-Construction Soil Quality and Depth
BMP L614 Full Dispersion
2.2.2 Site Design BMPs
BMP L620 Preserving Natural Vegetation
BMP L621 Better Site Design
2.2.3 Structural Low Impact Development BMPs
BMP L630 Bioretention Areas (Rain gardens)
BMP L631 Vegetated Rooftops
BMP L632 Rainfall Reuse
BMP L633 Alternate Paving Systems
BMP L634 Minimal Excavation Foundations
BMP L635 Reverse Slope Sidewalks
Infiltration BMPs can be found in Volume 3 and Volume 5.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 753
Projects shall employ these BMPs to infiltrate, disperse, and retain stormwater runoff on site to the
maximum extent practicable without causing flooding or erosion impacts. Infiltration and dispersion
systems require approval by the City. Sites that can fully infiltrate (see Volume 3, Chapter 3 and
Volume 5, Chapter 5) or fully disperse (see BMP L614) are not required to provide runoff treatment or
flow control facilities. Full dispersion credit is limited to sites with a maximum of 10% effective
impervious area that is dispersed through 65% of the site maintained in natural vegetation.
Impervious surfaces that are not fully dispersed should be partially dispersed to the maximum extent
practicable and then hydrologically modeled. Minimum requirements still apply to those portions of a
site that exceed thresholds described in Volume 1.
2.2.1 Dispersion and Soil Quality BMPs
2.2.1.1 BMP L610 Downspout Dispersion
Purpose and Definition
Downspout dispersion BMPs are splashblocks or gravel-filled dispersion trenches that serve to
spread roof runoff over vegetated pervious areas. Dispersion attenuates peak flows by slowing entry
of the runoff into the conveyance system, allows for some infiltration, and provides some water
quality benefits.
Applications
Downspout dispersion may be used on all sites that cannot infiltrate roof runoff and that meet the
feasibility setback requirements.
Flow Credit for Roof Downspout Dispersion
If roof runoff is dispersed according to the requirements of this section, and the vegetative flowpath of
the roof runoff is 50 feet or greater through undisturbed native landscape or lawn/landscape area that
meets BMP L613, the roof area may be modeled as a grassed surface.
General Design Criteria for Dispersion Trenches and Splashblocks
Also see Additional Design Criteria sections.
Maintain a vegetated flowpath of at least 50 feet in length between the outlet of the
trench and the top of slopes steeper than 20% and greater than 10 feet high. A
geotechnical analysis and report must be prepared addressing the potential impact
of the facility on the slope.
Vegetated flowpaths must be covered with well-established lawn or pasture, landscaping
with well-established groundcover, or native vegetation with natural groundcover.
The groundcover shall be dense enough to help disperse and infiltrate flows and to
prevent erosion.
For sites with multiple dispersion trenches or splashblocks, a minimum separation of 10
feet is required between flowpaths. The City may require a larger separation based
upon site conditions such as slope, soil type, and total contributing area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 754
• Place all dispersions systems at least 10 feet from any structure. If necessary,
setbacks shall be increased from the minimum 10 feet in order to maintain a 1:1 side
slope for future excavation and maintenance.
• Place all dispersion systems at least 5 feet from any property line. If necessary,
setbacks shall be increased from the minimum 5 feet in order to maintain a 1:1 side
slope for future excavation and maintenance.
• Setback dispersion systems from sensitive areas, steep slopes, landslide hazard
areas, and erosion hazard areas as governed by Auburn City Code.
• No erosion or flooding of downstream properties shall result.
• Runoff discharged towards landslide hazard areas must be evaluated by a
geotechnical engineer or qualified geologist. Do not place the discharge point on or
above slopes greater than 20% or above erosion hazard areas without evaluation by
a geotechnical engineer or qualified geologist and City approval.
• For sites with septic systems, place the discharge point downgradient of the
drainfield primary and reserve areas. This requirement can be waived by the City's
permit review staff if site topography will clearly prohibit flows from intersecting the
drainfield.
Additional Design Criteria for Dispersion Trenches
• Design dispersion trenches as shown in Figure VI-2-1 and Figure VI-2-2.
• Maintain a vegetated flowpath of at least 25 feet in length between the outlet of the
trench and any property line, structure, stream, wetland, or impervious surface.
Sensitive area buffers may count towards flowpath lengths
• Maintain a vegetated flowpath of at least 50 feet in length between the outlet of the
trench and any steep slope.
• Trenches serving up to 700 square feet of roof area may be simple 10-foot-long by
2-foot-wide gravel filled trenches as shown in Figure VI-2-1. For roof areas larger
than 700 square feet, a dispersion trench with notched grade board as shown in
Figure VI-2-2 may be used as approved by the City. The total length of this design
must provide at least 10 feet of trench per 700 square feet of roof area and not
exceed 50 feet.
Additional Design Criteria for Splashblocks
In general, if the ground is sloped away from the building foundation, and there is adequate
vegetation and area for effective dispersion, splashblocks will adequately disperse storm runoff. If the
ground is fairly level, if the structure includes a basement, or if foundation drains are proposed,
splashblocks with downspout extensions may be a better choice because the discharge point is
moved away from the foundation. Downspout extensions can include piping to a
splashblock/discharge point a considerable distance from the downspout, as long as the runoff can
travel through a well-vegetated area as described below.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 755
The following conditions must be met to use splashblocks:
• Design splashblocks as shown in Figure VI-2-3.
• Maintain a vegetated flowpath of at least 50 feet between the discharge point and
any property line, structure, stream, wetland, lake, or other impervious surface.
Sensitive area buffers may count toward flowpath lengths.
• Do not direct flows onto sidewalks.
• A maximum of 700 square feet of roof area may drain to each splashblock.
• Place a splashblock or a pad of crushed rock (2 feet wide by 3 feet long by 6 inches
deep) at each downspout discharge point.
• No erosion or flooding of downstream properties may result.
• Splashblocks may not be placed on or above slopes greater than 20% or above
erosion hazard areas without evaluation by a geotechnical engineer or qualified
geologist and approval by the City.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 756
Figure VI-2-1. Typical Dispersion Trench
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 757
Figure VI-2-2. Standard Dispersion Trench with Notched Grade Board
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 758
Figure VI-2-3. Typical Downspout Splashblock Dispersion
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 759
2.2.1.2 BMP L611 Concentrated Flow Dispersion
Purpose and Definition
Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious
area attenuates peak flows by slowing entry of the runoff into the conveyance system, allows for
some infiltration, and provides some water quality benefits.
Applications and Limitations
• Any situation where concentrated flow can be dispersed through vegetation.
• Dispersion for driveways will generally only be effective for single-family residences
on large lots and in rural short plats. Lots proposed by short plats in urban areas will
generally be too small to provide effective dispersion of driveway runoff.
• Figure VI-2-4 shows two possible ways of spreading flows from steep driveways.
Design Criteria
• Maintain a vegetated flowpath of at least 50 feet between the discharge point and
any property line, structure, steep slope, stream, lake, wetland, lake, or other
impervious surface.
• A maximum of 700 square feet of impervious area may drain to each concentrated
flow dispersion BMP.
• Place a pad of crushed rock (2 feet wide by 3 feet long by 6 inches deep) at each
discharge point.
• No erosion or flooding of downstream properties shall result.
• Runoff discharged towards landslide hazard areas must be evaluated by a
geotechnical engineer or qualified geologist. The discharge point shall not be placed
on or above slopes greater than 20% or above erosion hazard areas without
evaluation by a geotechnical engineer or qualified geologist and approval by the City.
• For sites with septic systems, locate the discharge point downgradient of the
drainfield primary and reserve areas. This requirement may be waived by the City if
site topography clearly prohibits flows from intersecting the drainfield or where site
conditions indicate that this is unnecessary (see Volume 3, Chapter 2).
Flow Credits for Concentrated Flow Dispersion
Where concentrated flow dispersion is used to disperse runoff into an undisturbed native landscape
area or an area that meets the requirements of “Post-Construction Soil Quality and Depth”, and the
vegetated flow path is at least 50 feet in length, the impervious area may be modeled as landscaped
area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 760
Figure VI-2-4. Typical Concentrated Flow Dispersion for Steep Driveways
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 761
2.2.1.3 BMP L612 Sheet Flow Dispersion
Purpose and Definition
Sheet flow dispersion is the simplest method of runoff control. This BMP can be used for any
impervious or pervious surface that is graded so as to avoid concentrating flows. Because flows are
already dispersed as they leave the surface, they need only traverse a narrow band of adjacent
vegetation for effective attenuation and treatment.
Applications and Limitations
Flat or moderately sloping (<15% slope) impervious surfaces such as driveways, sport courts, patios,
and roofs without gutters; sloping cleared areas that are comprised of bare soil, non-native
landscaping, lawn, and/or pasture; or any situation where concentration of flows can be avoided.
Design Criteria
• See Figure VI-2-5 for details for driveways.
• Provide a 2-foot-wide transition zone to discourage channeling between the edge of
the driveway pavement and the downslope vegetation, or under building eaves. This
may be an extension of subgrade material (crushed rock), modular pavement, drain
rock, or other material acceptable to the City.
• Provide a vegetated buffer width of 10 feet of vegetation for up to 20 feet of width of
paved or impervious surface. Add an additional 5 feet of width for each additional
20 feet of width or fraction thereof.
• Provide a vegetated buffer width of 25 feet of vegetation for up to 150 feet of
contributing cleared area (i.e., bare soil, non-native landscaping, lawn, and/or
pasture). Slopes within the 25-foot minimum flowpath through vegetation should be
no steeper than 8 percent. If this criterion cannot be met due to site constraints, the
25-foot flowpath length must be increased 1.5 feet for each percent increase in slope
above 8%.
• No erosion or flooding of downstream properties may result.
• Runoff discharge toward landslide hazard areas must be evaluated by a
geotechnical engineer or a qualified geologist. Do not place the discharge point on or
above slopes greater than 20% or above erosion hazard areas without evaluation by
a geotechnical engineer or qualified geologist and approval by the City.
• For sites with septic systems, place the discharge point downgradient of the
drainfield primary and reserve areas. This requirement may be waived by the City if
site topography clearly prohibits flows from intersecting the drainfield or where site
conditions indicate that this is unnecessary (see Volume 3, Chapter 2).
Flow Credits for Sheet Flow Dispersion
Where sheet flow dispersion is used to disperse runoff into an undisturbed native landscape area or
an area that meets the requirements of “Post-Construction Soil Quality and Depth”, the impervious
area may be modeled as landscaped area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 762
Figure VI-2-5. Sheet Flow Dispersion for Driveways
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 763
2.2.1.4 BMP L613 Post-Construction Soil Quality and Depth
Purpose and Definition
Naturally occurring (undisturbed) soil and vegetation provide important stormwater functions
including: water infiltration; nutrient, sediment, and pollutant adsorption; sediment and pollutant
biofiltration; water interflow storage and transmission; and pollutant decomposition. These functions
are largely lost when development strips away native soil and vegetation and replaces it with minimal
topsoil and sod. Not only are these important stormwater functions lost, but such landscapes
themselves become pollution generating pervious surfaces due to increased use of pesticides,
fertilizers, and other landscaping and household/industrial chemicals, the concentration of pet
wastes, and pollutants that accompany roadside litter.
Applications and Limitations
• Soil amendments are required for the disturbed areas of sites subject to Minimum
Requirement #5.
• Where Minimum Requirement #5 does not apply, and the site is proposing a traditional lawn
installation, compost-amended lawn soil is strongly encouraged.
• Use soil amendments in areas that will be incorporated into the stormwater drainage system
such as vegetated channels, rain gardens, bioretention areas, and lawn and landscaped
areas.
Design Criteria
Soil Retention
• The duff layer and native topsoil should be retained in an undisturbed state to the
maximum extent practicable. In any areas requiring grading, remove and
stockpile the duff layer and topsoil on site in a designated, controlled area, not
adjacent to public resources and critical areas, to be reapplied to other portions
of the site where feasible.
Soil Quality
• All areas subject to clearing and grading that have not been covered by impervious
surface, incorporated into a drainage facility or engineered as structural fill or slope
shall, at project completion, demonstrate the following:
o A topsoil layer with a minimum organic matter content of ten percent dry
weight in planting beds, and 5% organic matter content in turf areas, and a
pH from 6.0 to 8.0 or matching the pH of the original undisturbed soil.
o The topsoil layer shall have a minimum depth of eight inches except where
tree roots limit the depth of incorporation of amendments needed to meet the
criteria. Subsoils below the topsoil layer should be scarified at least 4 inches
with some incorporation of the upper material to avoid stratified layers, where
feasible.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 764
• Planting beds have been mulched with 2 inches of organic material
• Quality of compost and other materials used to meet the organic content
requirements:
o The organic content for “pre-approved” amendment rates can be met only
using compost that meets the definition of “composted materials” in WAC
173-350-220. The WAC is available online at:
http://www.ecy.wa.gov/programs/swfa/facilities/350.html
The compost must also have an organic matter content of 35% to 65%, and a carbon
to nitrogen ratio below 25:1.
The carbon to nitrogen ratio may be as high as 35:1 for plantings composed entirely
of plants native to the Puget Sound Lowlands region.
o Calculated amendment rates may be met through use of composted
materials as defined above; or other organic materials amended to meet
the carbon to nitrogen ratio requirements, and meeting the contaminant
standards of Grade A Compost.
• The resulting soil is conducive to the type of vegetation to be established.
Implementation Options:
Use one of the following options to meet the post construction soil quality and depth requirements.
Use the most recent version of “Guidelines for Resources for Implementing Soil Quality and Depth
BMP T5.13” to meet the requirements of this BMP. This guidance can be found online at:
www.soilsforsalmon.org
• Leave native vegetation and soil undisturbed, and protect from compaction during
construction.
• Amend existing site topsoil or subsoil either at default “pre-approved” rates, or at
custom calculated rates based on specifiers’ tests of the soil and amendment.
• Stockpile existing topsoil during grading, and replace it prior to planting. Stockpiled
topsoil must also be amended if needed to meet the organic matter or depth
requirements, either at a default “pre-approved” rate or at a custom calculated rate.
• Import topsoil mix of sufficient organic content and depth to meet the requirements.
More than one method may be used on different portions of the same site. Soil that already meets
the depth and organic matter quality standards, and is not compacted, does not need to be
amended.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 765
Maintenance
• Soil quality and depth should be established toward the end of construction and once
established, should be protected from compaction, such as from large machinery
use, and from erosion.
• Soil should be planted and mulched after installation.
• Plant debris or its equivalent should be left on the soil surface to replenish organic
matter.
• It should be possible to reduce use of irrigation, fertilizers, herbicides, and pesticides.
These activities should be adjusted where possible, rather than continuing to
implement formerly established practices.
Flow Reduction Credits for BMP L613
Flow reduction credits can be taken in runoff modeling when Post-Construction Soil Quality and
Depth is used as part of a dispersion design under the conditions described in:
BMP L610 Downspout Dispersion
BMP L611 Concentrated Flow Dispersion
BMP L612 Sheet Flow Dispersion
Volume 3, Appendix A
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 766
2.2.1.5 BMP L614 Full Dispersion
Purpose and Definition
This BMP allows for "fully dispersing" runoff from impervious surfaces and cleared areas of
development sites that preserve at least 65% of the site (or a threshold discharge area on the site) in
a forest or native condition.
Applications and Limitations
• Full dispersion can be used as long as the developed areas draining to the native
vegetation do not have impervious surfaces that exceed 10% of the entire site.
• Other types of development that retain 65% of the site (or a threshold discharge area
on the site) in a forested or native condition may also use these BMPs to avoid
triggering the flow control facility requirement.
• Runoff must be dispersed into native areas.
Design Guidelines
• Roof Downspouts - Roof surfaces that comply with the downspout infiltration
requirements in Volume 3, Chapter 3, are considered to be "fully dispersed" (i.e.,
zero percent effective imperviousness). All other roof surfaces are considered to be
"fully dispersed" (i.e., at or approaching zero percent effective imperviousness) only
if they are within a threshold discharge area that is or will be more than 65% forested
(or native vegetative cover) and less than 10% impervious (total), and if they comply
with the downspout dispersion requirements of BMP L610, and have vegetated flow
paths through native vegetation exceeding 100 feet.
• Driveway Dispersion - Driveway surfaces are considered to be "fully dispersed" if
they are within a threshold discharge area that is or will be more than 65% forested
(or native vegetative cover) and less than 10% impervious (total), and if they comply
with the driveway dispersion BMPs – BMP L611 and BMP L612 - and have flow
paths through native vegetation exceeding 100 feet. This also holds true for any
driveway surfaces that comply with the roadway dispersion BMPs described below.
• Roadway Dispersion BMPs - Roadway surfaces are considered to be "fully
dispersed" if they are within a threshold discharge area that is or will be more than
65% forested (or native vegetative cover) and less than 10% impervious (total), and
if they comply with the following dispersion requirements:
o Roadway runoff dispersion is allowed only on rural neighborhood collectors
and local access streets. To the extent feasible, disperse driveways to the
same standards as roadways to ensure adequate water quality protection of
downstream resources.
o Design the road section to minimize collection and concentration of roadway
runoff. Use sheet flow over roadway fill slopes (i.e., where roadway subgrade
is above adjacent right-of-way) wherever possible to avoid concentration.
o When it is necessary to collect and concentrate runoff from the roadway and
adjacent upstream areas (e.g., in a ditch on a cut slope), concentrated flows
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 767
shall be incrementally discharged from the ditch via cross culverts or at the
ends of cut sections. These incremental discharges of newly concentrated
flows shall not exceed 0.5 cfs at any one discharge point from a ditch for the
100-year runoff event. Where flows at a particular ditch discharge point were
already concentrated under existing site conditions (e.g., in a natural channel
that crosses the roadway alignment), the 0.5-cfs limit would be in addition to
the existing concentrated peak flows.
o Ditch discharge points with up to 0.2 cfs discharge for the peak 100-year flow
shall use rock pads or dispersion trenches to disperse flows. Ditch discharge
points with between 0.2 and 0.5 cfs discharge for the 100-year peak flow
shall use only dispersion trenches to disperse flows.
o Dispersion trenches shall be designed to accept storm flows (free discharge)
from a pipe, culvert, or ditch end, shall be aligned perpendicular to the
flowpath, and shall be minimum 2 feet by 2 feet in section, 50 feet in length,
filled with ¾-inch to 1½-inch washed rock, and provided with a level notched
grade board (see Figure VI-2-2). Manifolds may be used to split flows up to
2 cfs discharge for the 100-year peak flow between up to 4 trenches.
Dispersion trenches shall have a minimum spacing of 50 feet.
o After being dispersed with rock pads or trenches, flows from ditch discharge
points must traverse a minimum of 100 feet of undisturbed native vegetation
before leaving the project site, or entering an existing onsite channel carrying
existing concentrated flows across the road alignment.
o Flowpaths from adjacent discharge points must not intersect within the 100-
foot flowpath lengths, and dispersed flow from a discharge point must not be
intercepted by another discharge point. To enhance the flow control and
water quality effects of dispersion, the flowpath shall not exceed 15% slope,
and shall be located within designated open space.
o Ditch discharge points shall be located a minimum of 100 feet upgradient of
steep slopes (i.e., slopes steeper than 40%), wetlands, and streams.
o Where the City determines there is a potential for significant adverse impacts
downstream (e.g., erosive steep slopes or existing downstream drainage
problems), dispersion of roadway runoff may not be allowed, or other
measures may be required. See Volume 1, Chapter 2 for geographic specific
requirements.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 768
Cleared Area Dispersion BMPs
The runoff from cleared areas that are comprised of bare soil, non-native landscaping, lawn, and/or
pasture is considered to be "fully dispersed" if it is dispersed through at least 25 feet of native
vegetation in accordance with the following criteria:
• The contributing flowpath of cleared area being dispersed must be no more than 150
feet.
• Slopes within the 25-foot minimum flowpath through native vegetation should be no
steeper than 8%. If this criterion cannot be met due to site constraints, the 25-foot
flowpath length must be increased 1.5 feet for each percent increase in slope above
8%.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 769
2.2.2 Site Design BMPs
2.2.2.1 BMP L620 Preserving Natural Vegetation
Purpose
Preserving natural vegetation on-site to the maximum extent practicable will minimize the impacts of
development on stormwater runoff.
Applications and Limitations
On lots that are one acre or greater, preservation of 65 percent or more of the site in natural
vegetation will allow the use of full dispersion techniques presented in BMP L614. Sites that can fully
disperse are not required to provide runoff treatment or flow control facilities.
Design Criteria
• Situate the preserved area to maximize the preservation of wetlands, and to buffer
stream corridors.
• Place the preserved area in a separate tract or protect through recorded easements
for individual lots.
• If feasible, locate the preserved area downslope from the building sites, since flow
control and water quality are enhanced by flow dispersion through duff, undisturbed
soils, and native vegetation.
• Show the preserved area on all property maps and clearly mark the area during
clearing and construction on the site.
Maintenance
• Do not remove vegetation and trees from undisturbed areas, except for approved
timber harvest activities and the removal of dangerous and diseased trees.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 770
2.2.2.2 BMP L621 Better Site Design
Purpose
Fundamental hydrological concepts and stormwater management concepts can be applied at the site
design phase that are:
• More integrated with natural topography,
• Reinforce the hydrologic cycle,
• More aesthetically pleasing, and
• Often less expensive to build.
Design Criteria
Define Development Envelope and Protected Areas – The first step in site planning is to define
the development envelope. This is done by identifying protected areas, setbacks, easements and
other site features, and by consulting applicable local standards and requirements. Site features to be
protected may include important existing trees, steep slopes, erosive soils, riparian areas, or
wetlands.
By keeping the development envelope compact, environmental impacts can be minimized,
construction costs can be reduced, and many of the site’s most attractive landscape features can be
retained. In some cases, economics or other factors may not allow avoidance of all sensitive areas.
In these cases, care can be taken to mitigate the impacts of development through site work and other
landscape treatments.
Minimize Directly Connected Impervious Areas
Impervious areas directly connected to the storm drain system are the greatest contributors to urban
nonpoint source pollution. Minimize these directly connected impervious areas. This can be done by
limiting overall impervious land coverage or by infiltrating and/or dispersing runoff from these
impervious areas.
• Maximize Permeability - Within the development envelope, many opportunities are
available to maximize the permeability of new construction. These include minimizing
impervious areas, paving with permeable materials, clustering buildings, and
reducing the land coverage of buildings by smaller footprints. All of these strategies
make more land available for infiltration and dispersion through natural vegetation.
• Build Narrower Streets - More than any other single element, street design has a
powerful impact on stormwater quantity and quality. In residential development,
streets and other transportation-related structures typically can comprise between 60
and 70 percent of the total impervious area, and, unlike rooftops, streets are almost
always directly connected to the stormwater conveyance system.
• Maximize Choices for Mobility - Given the costs of automobile use, both in land
area consumed and pollutants generated, maximizing choices for mobility is a basic
principle for environmentally responsible site design. By designing residential
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 771
developments to promote alternatives to automobile use, a primary source of
stormwater pollution can be mitigated.
• Use Drainage as a Design Element - Unlike conveyance storm drain systems that
hide water beneath the surface and work independently of surface topography, a
drainage system for stormwater infiltration or dispersion can work with natural land
forms and land uses to become a major design element of a site plan.
2.2.3 Low Impact Development BMPS
Low impact development BMPs are structural BMPs that can be used to manage stormwater on-site.
Using LID techniques can reduce surface runoff. For each category, basic design criteria is included.
The design criteria components in this manual must be used in order to obtain runoff credits. Runoff
credits are considered when determining project thresholds.
The guidance provided in “Low Impact Development: Technical Guidance Manual for Puget Sound”,
found on the Puget Sound Partnership website: www.psp.wa.gov, should also be used in design.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 772
2.2.3.1 BMP L630 Bioretention Areas (Rain Gardens)
Purpose and Definition
Bioretention areas are shallow stormwater retention systems designed to mimic forested systems by
controlling stormwater through detention, infiltration, and evapotranspiration. Bioretention areas
provide water quality treatment through sedimentation, filtration, adsorption, and phytoremediation.
Bioretention facilities are integrated into the landscape to mimic natural hydrologic conditions better.
Bioretention facilities may be used as a water quality facility or a water quality and flow control
(retention) facility.
Applicability and Limitations
• Rain gardens can be used as on-lot retention facilities.
• Rain gardens may be used to receive roof runoff in areas where traditional infiltration
is not feasible.
• Three feet of clearance is necessary between the lowest elevation of the bioretention
soil or any underlying gravel layer and the seasonal high groundwater elevation or
other impermeable layer if the area tributary to the facility meets or exceeds any of
the following:
o 5000 square feet of pollution-generating impervious surface
o 10,000 square feet of impervious area
o ¾ acre of lawn and landscape
• For bioretention systems with a contributing area less than the above thresholds, a
minimum of 1 foot of clearance is required from the seasonal high groundwater or
other impermeable layer.
• Bioretention facilities can be used in parking lots and any other type of development.
• Bioretention systems may meet the requirements for basic and enhanced treatment
when soil is designed in accordance with the requirements below and at least 91% of
the influent runoff volume using WWHM is infiltrated. Drawdown requirements must
also be met.
Setback and Site Constraints
• Assure that water movement through the surface soils and interflow will remain unobstructed
and soils will remain uncompacted.
• Locate bioretention facilities at least 10 feet from any structure or property line unless
approved in writing by the City.
• Locate bioretention facilities at least 50 feet back from slopes with a grade of 20% or greater.
A geotechnical analysis must be prepared addressing the potential impact of the facility on
the slope if closer than 50 feet or greater than 20%.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 773
Design Criteria
Flow Entrance/Presetting
• Flow velocity entering the facility should be less than 1 ft/sec.
• Use one of the four types of flow entrances:
o Dispersed, low velocity flow across a grade or landscape area.
o Dispersed flow across pavement or gravel and past wheel stops for parking
areas.
o Dispersed curb cuts for driveway or parking lot areas. Include rock or other
erosion protection material in the channel entrance to dissipate energy.
o Pipe flow entrance. Include rock or other erosion protection material at the
facility entrance to dissipate energy and/or provide flow dispersion.
• Do not place woody plants directly in the entrance flow path as they can restrict or
concentrate flows.
• A minimum 1-inch grade change between the edge of a contributing impervious
surface and the vegetated flow entrance is required.
• Install flow diversion and erosion control measures to protect the bioretention area
from sedimentation until the upstream area is stabilized.
• If the catchment area exceeds 2,000 square feet, a presettling facility may be
required.
Cell Ponding Area
• The ponding area provides for surface storage and particulate settling,
• Ponding depth and drawdown rate provide variable conditions that allow for a range
of appropriate plant species. Soil must be allowed to dry out periodically in order to:
o Restore hydraulic capacity of system.
o Maintain infiltration rates.
o Maintain adequate soil oxygen levels for healthy soil biota and vegetation.
o Provide proper soil conditions for biodegradation and retention of pollutants.
o Prevent conditions supportive of mosquito breeding.
• The ponding depth shall be a maximum of 12 inches.
• The surface pool drawdown time shall be 24 hours.
• The minimum freeboard measured from the invert of the overflow pipe or earthen
channel to facility overtopping elevation shall be 2” for drainage areas less than
1,000 square feet and 6” for drainage areas 1,000 square feet or greater.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 774
• If berming is used to achieve the minimum top elevation, maximum slope on berm
shall be 4H:1V, and minimum top width of design berm shall be 1 foot. Soil for
berming shall be imported bioretention soil or amended native soil compacted to a
minimum of 90% dry density.
Overflow
• Unless designed for full infiltration of the entire runoff volume, bioretention systems
must include an overflow.
• A drain pipe installed at the designed maximum ponding elevation and connected to
a downstream BMP or an approved discharge point can be used as the overflow.
• Overflow shall be designed to convey the 100-year recurrence interval flow.
Soils
• For bioretention systems to meet the requirements for basic and enhanced treatment
the following requirements must be met:
• The bioretention soil mix (BSM) shall meet the following requirements:
o Have an infiltration rate between 1 and 2.4 inches per hour.
o The CEC must be at least 5 meq/100 grams of dry soil.
o The soil mix should be about 40% by volume compost and about 60% by
volume aggregate component. The aggregate component shall meet the
specifications in Table VI-2-1
o The compost component shall be stable, mature, and derived from organic
waste materials including yard debris, wood wastes, or other organic matter.
Compost must meet the Washington State compost regulations in WAC 173-
350, which is available at http://www.ecy.wa.gov/programs/compost
Table VI-2-1. Bioretention Soil Mix Aggregate Component
Sieve Size Percent Passing
3/8” 100
#4 95-100
#10 75-90
#40 25-40
#100 4-10
#200 2-5
o Minimum depth of treatment soil must be 18 inches.
o Soil depths of 24” and greater should be considered to provide improved
removal of nutrients as needed, including phosphorus.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 775
• For facilities that infiltrate and do not have an underdrain, a soils report, prepared by
a soils professional, shall be required and must address the following for each
bioretention area:
o A minimum of one soil log or test pit is required at each facility.
o The soil log shall extend a minimum of 4 feet below the bottom of the
subgrade (the lowest point of excavation).
o The soil log must describe the USDA textural class of the soil horizon through
the depth of the log and note any evidence of high groundwater level, such as
mottling.
o Use infiltration rates of the native soil when sizing and modeling bioretention
systems.
Underdrain
Only install underdrains in bioretention areas if:
• Infiltration is not permitted and/or a liner is used, or
• Where infiltration rates are not adequate to meet the maximum pool drawdown
time.
• Where the facility is not utilized for infiltration.
Underdrain pipe diameter will depend on hydraulic capacity required, 6-inch minimum.
Use a geotextile fabric between the soil layer and underdrain.
Planting
• Plants must be tolerant of summer drought, ponding fluctuations, and saturated soil
conditions.
• Consider rooting depth when choosing plants. Roots must not damage underground
infrastructure.
• Locate slotted and perforated pipe at least 5 feet from tree roots and side sewer
pipes.
• Consider adjacent plant communities and potential invasive species.
• Consider aesthetics, rain gardens should blend into surrounding landscapes.
• The “Low Impact Development: Technical Guidance Manual for Puget Sound”
Appendix 3 contains information for selecting proper bioretention vegetation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 776
Mulch Layer
• Bioretention areas should be designed with a mulch layer. Properly selected mulch
material reduces weed establishment, regulates soil temperatures and moisture, and
adds organic matter to soil. Mulch should be:
o Compost in the bottom of the facilities,
o Wood chip mulch composed of shredded or chipped hardwood or softwood
on cell slopes,
o Free of weed seeds, soil, roots, and other material that is not trunk or branch
wood and bark,
o A maximum of 3 inches thick for compost or 4 inches thick for wood chips.
• Mulch shall not include grass clippings, mineral aggregate or pure bark.
• A dense groundcover can be used as an alternative to mulch though mulch most be
used until the dense groundcover is established.
Modeling and Sizing
For sites with contributing area less than 2,000 square feet:
Table VI-2-2 provides the square footage of the bottom of the rain garden per 1000 square feet of
roof area.
The same method of sizing can be used for rain gardens receiving driveway runoff if the soils meet
the water quality treatment requirements outlined in Section 2.2.3.1 in the Soils subsection, or the
runoff passes through a basic treatment facility before reaching the rain garden. Collection areas
greater than 2000 square feet must be designed by a professional engineer.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 777
Table VI-2-2. Sizing Table for Rain Gardens
Soil Type Raingarden bottom
(square feet)
Coarse sands and cobbles 25
Medium sands 60
Fine sands, loamy sands 130
Sandy loam 160
Loam 225
For sites with contributing areas 2,000 square feet or more:
Use WWHM and model the facility as an infiltration facility with appropriate stage-storage and
overflow/outflow rates. Bioretention cells may be modeled as a layer of soil with infiltration to
underlying soil, ponding, and overflow. The tributary area, cell bottom area, and ponding depth
should be iteratively sized until the duration curves and/or peak volumes meet the flow control
requirements.
NOTE: WWHM Pro has the ability to model bioretention areas with or without underdrains so facility
will be sized differently than described above. Contact the Washington State Department of Ecology
for more information. Use the assumptions in Table VI-2-3 when sizing the facilities.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 778
Table VI-2-3. Modeling Assumptions for Rain Garden Sizing
Variable Assumption
Computational Time Step 15 minutes
Inflows to Facility Surface flow and interflow from drainage area routed to facility
Precipitation and Evaporation
Applied to Facility
Yes
Bioretention Soil Infiltration Rate For imported soils, for sites that have a contributing area of
less than 5,000 square feet of pollution generating surfaces,
less than 10,000 square feet of impervious area, and less than
¾ acre of landscaped area, reduce the infiltration rate of the
BSM by a factor of 2. For sites above these thresholds, a
reductions factor of 4 shall be applied.
For compost amended native soil, rate is equal to native soil
design infiltration rate.
Bioretention Soil Porosity 40%
Bioretention Soil Depth Minimum of 18 inches.
Native Soil Infiltration Rate Measured infiltration rate with applicable safety factors. See
Volume III for more information on infiltration rate
determination.
Infiltration Across Wetted Surface
Area
Only if sides slopes are 3:1 or flatter
Overflow Overflow elevation set at maximum ponding elevation
(excluding freeboard). May be modeled as weir flow over rider
edge or riser notch.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 779
2.2.3.2 BMP L631 Vegetated Rooftops (Green Roofs)
Purpose and Definition
Vegetated rooftops, also know as green roofs or eco-roofs, are veneers of living vegetation that are
installed on top of conventional roofs. A green roof is an extension of the existing roof, which involves
a special root repelling membrane, a drainage system, a lightweight growing medium, and plants.
Vegetated walls and slopes may also be allowed.
Applications and Limitations
Vegetated rooftops offer a practical method of managing runoff in densely developed urban
neighborhoods and can be engineered to achieve specific stormwater runoff control objectives.
Design Guidelines
• Soil or growth media must have a high field capacity.
• Soil or growth media must have a saturated hydraulic conductivity of 1 inch/hour.
• Drainage layer must allow free drainage under the soil/growth media.
• Vegetative cover must be both drought and wet tolerant.
• There must be a waterproof membrane between the drain layer and the structural
roof support.
• The maximum slope shall be 20%.
Flow Credits for Vegetated Roofs
Where vegetated roofs are used, the impervious areas may be modeled based on the thickness of
the soil media:
• For roofs with 3-8” of soil/growing media, model the roof as 50% till landscaped and
50% impervious.
• For roofs with 8” of soil/growing media, model the roof as 50% till pasture and 50%
impervious.
Resource Material
Miller, C. and Grantley Pyke. Methodology for the Design of Vegetated Roof Covers, Proceedings of
the 1999 International Water Resources Engineering Conference, Seattle, Washington.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 780
2.2.3.3 BMP L632 Rainfall Reuse Systems
Purpose and Definition
Rainfall reuse systems are designed to collect stormwater runoff from non-pollution generating
surfaces and make use of the collected water. Rainfall reuse systems are also known as rainwater
harvesting systems and rainfall catchment systems.
Applications and Limitations
Highly developed areas where large buildings encompass nearly all of the area.
Approval of the water reuse system requires approval of the appropriate state and local agencies as
required for any water right.
Design Guidelines
• Where captured water is solely for outdoor use, density shall be 4 homes per acre or
less can be used.
• Cisterns can be incorporated into the aesthetics of the building and garden.
• If a rainwater reuse system holds more than 6 inches depth of water, it should be
covered securely or have a top opening of 4 inches or less to prevent small children
from gaining access to the standing water.
• Design and maintain the system to minimize clogging by leaves and other debris.
Flow Credits for Rainfall Reuse Systems
The drainage area to the rainfall reuse system does not need to be entered into the runoff model
when:
• 100% of the annual average runoff volume (using WWHM) is reused, or
• Interior uses have a monthly water balance that demonstrates adequate capacity for
each month and reuse of all stored water annually.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 781
2.2.3.4 BMP L633 Alternate Paving Surfaces
Purpose and Definition
Alternate paving surfaces include porous asphalt pavement, porous concrete, grid and lattice rigid
plastic or paving blocks where the holes are filled with soil, sand, or gravel; and cast-in-place paver
systems. Porous surfaces are designed to accommodate pedestrian, bicycle, and auto traffic while
allowing infiltration and storage of stormwater.
Alternate paving systems may be designed with an underdrain to collect stormwater or without an
underdrain as an infiltration facility.
Applications and Limitations
• Appropriate application for alternative porous surfaces depend on the type of paving
system, but typically include parking overflow areas, parking stalls, low volume
residential roads, low-volume parking areas, alleys, driveways, sidewalks/pathways,
and patios.
• Porous paving surfaces can provide some attenuation and uptake of stormwater
runoff even on cemented till soils while still providing the structural integrity required
for a roadway surface to support heavy loads.
• Porous paving surfaces work well in concert with other LID BMPs such as porous
parking stalls adjacent to bioretention areas, and porous roadway surfaces bordered
by vegetated swales.
• Although there is a drop of infiltration rates over time, the long-term infiltration rate is
still substantial enough to provide significant reductions in runoff.
• Infiltration through pervious pavement surfaces shall not be allowed with land uses
that generate heavy pollutant loads. The potential sediment loading for each
application should be considered when determining if the application of alternate
surfaces is appropriate.
• Runoff generated from lawns or other pervious surfaces shall not be directed onto
porous surfaces.
• No point discharges may be directed to porous surfaces.
• Sheet flow runoff may be directed onto a porous surface provided that the length of
sheet flow across the paved section is no more than twice the length of sheet flow
across the porous pavement section.
Design Criteria
• Unless approved in writing by The City, maximum slopes for alternative paving
surfaces are:
o 5% for porous asphalt
o 6% for porous concrete
o 10% for interlocking pavers
o 5-6% grid and lattice systems
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 782
• Follow manufacturer’s recommendations for design, installation, and maintenance.
• Subgrade infiltration rates less than 2.4 inches/hour and a cation exchange capacity
of 5 milliequivalents CEC/100 grams dry soil (or greater) will provide water quality
treatment.
• Typical cross-sections of porous paving systems consist of:
o A top layer with either porous asphalt, porous concrete, concrete block
pavers, or a plastic grid paver filled with sand topsoil or gravel.
o An aggregate subbase with larger rock at the bottom and smaller rock directly
under the top surface.
o For open-celled paving grids and blocks, a leveling course consisting of finer
aggregate.
o A geotextile fabric
• Both gravel and soil with vegetation can be used to fill the opening in paver and rigid
grid systems. Manufacturer recommendations should be followed to apply the
appropriate material.
• Porous systems that use pavers shall be confined with a rigid edge system to
prevent gradual movement of the paving stones.
• Subgrade layer:
o Compact the subgrade to the minimum necessary for structural stability. Do
not allow heavy compaction. The subgrade should not be subject to truck
traffic.
o Use on soil types A through C.
• Geotextile
o Use geotextile between subgrade and base material to keep soil out of base
layer.
o The geotextile must pass water at a greater rate than the subgrade soils.
• Separation or Bottom Filter Layer (optional but recommended)
o A layer of sand or crushed stone graded flat is recommended to promote
infiltration across the surface, stabilize the base layer, protect the underlying
soil from compaction, and serve as a transition between the base course and
the underlying geotextile.
• Base Material
Material must be free draining. Below are examples of possible base material specifications.
See Chapter 6 of the “Low Impact Development: Technical Guidance Manual for Puget
Sound” for more detailed information.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 783
Driveway base material:
o >4” layer of free-draining crushed rock, screened gravel, or washed sand.
o <5% fines (material passing the #200 sieve) based on fraction passing the #4
sieve.
Roads and Parking Lots
o Follow the standard material and quantities used for asphalt roads.
• Wearing Layer
o A minimum infiltration rate of 10 inches/hour is required though higher
infiltration rates are desirable.
o For porous asphalt, products must have adequate void space, commonly 12-
20%.
o For porous concrete, products must have adequate void space, commonly
15-21%.
o For grid/lattice systems filled with gravel, sand, or a soil of finer particles with
or without grass, fill must be at least 2”. Fill should be underlain with 6” or
more of sand or gravel to provide an adequate base. Locate fill at or slightly
below the top elevation the top elevation of the grid/lattice structure. Modular
grid openings must be at least 40% of the total surface area.
o For paving blocks, fill spaces between blocks with 6” of free draining sand or
aggregate material. Provide a minimum of 12% free draining surface area.
• Drainage Conveyance
o Design roads with adequate drainage conveyance facilities if the road surface
was impermeable.
o Design drainage flow paths to move water safely away from the road prism
and into the roadside drainage facility for roads with base courses that extend
below the surrounding grade.
• Acceptance Test
o Test all permeable surfaces by throwing a bucket of water on the surface. If
anything runs off the surface or puddles, additional testing is necessary prior
to accepting the construction.
o As directed by The City, test with a 6” ring infiltrometer or sprinkle
infiltrometer. Wet the road surface continuously for 10 minutes. Test to
determine compliance with 10 inches/hour minimum infiltration rate.
o For facilities designed to infiltrate, the bucket test shall be completed
annually.
o Test documentation shall be retained with maintenance records.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 784
Maintenance
• Follow manufacturer’s suggestions for maintenance.
• Inspect project upon completion to correct accumulation of fine material. Conduct
periodic visual inspections to determine if surfaces are clogged.
• Sweep non-planted surfaces with a high-efficiency sweeper twice per year, one in
autumn, and one in early spring. Sweeping frequency can be reduced if infiltration
rate testing indicates that a rate of 10 inches/hour or greater is being maintained.
• Maintenance records shall be retained and provided to the City upon request.
Flow Credits for Alternate Paving Systems
Flow credits for alternate paving systems are based on the base material and type of alternate
surface. The following lists the possible credits that can be achieved by using alternative paving
systems:
For porous asphalt or concrete systems used as public road or public parking lot
configurations:
Where base material is laid above surrounding grade:
• Without an underdrain, model the surface as grass over underlying soil type.
• With an underdrain either at or below the bottom of the base layer or elevated
within the base course, model the surface as impervious.
Where base material is laid partially or completely below surrounding grade:
• Without an underdrain, model the surface as grass over underlying soil type or
impervious surface routed to an infiltration.
• With an underdrain at or below bottom of base layer or elevated within the base
course, model the surface as impervious.
For porous asphalt or concrete systems used at private facilities such as driveways, parking
lots, walks, and patios:
Where the base material is laid below ground:
• Without an underdrain, model the surface as 50% grass on underlying soil and
50% impervious.
• With a pipe underdrain, model the surface as impervious.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 785
For grid/lattice systems and paving blocks used as public road or public parking lot:
Where base material is laid above the surrounding grade:
• Without an underdrain, model grid/lattice systems as grass on underlying soil and
model paving blocks as 50% grass on underlying soil with 50% impervious.
• With an underdrain, model the surface as impervious.
Where base material is laid partially or completely below surround ground:
• Without an underdrain, model grid/lattice systems as grass on underlying soil and
model paving blocks as 50% grass with 50% impervious or model both
grid/lattice systems and paving blocks as impervious surfaces routed to an
infiltration basin.
• With an underdrain, at or below bottom of the base layer, model the surface as
impervious.
With an underdrain elevated within the base course, model the surface as impervious routed to
an infiltration basin.
For grid/lattice systems and paving blocks used at private facilities (driveways, parking lots,
walks, patios, etc.):
Where base material is laid partially or completely below surrounding ground:
• Without an underdrain, model the surface as 50% grass and 50% impervious.
• With an underdrain, model the surface as impervious.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 786
2.2.3.5 BMP L634 Minimal Excavation Foundations
Purpose and Definition
Minimal excavation foundation systems are those techniques that minimize disturbance to the natural
soil profile within the footprint of the structure. This preserves most of the hydrologic properties of the
native soil. Pin foundations are an example of a minimal excavation foundation.
Applications Limitations
• Suitable for pier and perimeter wall configurations for residential or commercial
structures up to three stories high.
• Useful for elevated paths and foot-bridges in environmentally sensitive areas.
• Heavy equipment cannot be used within or immediately surrounding the building.
Terracing of the foundation area may be accomplished by tracked, blading
equipment not exceeding 650 psf.
Design Criteria
See Chapter 6 of “Low Impact Development: Technical Guidance Manual for Puget Sound” for
design information.
Flow Credits for Minimal Excavation Foundation Systems
• Where roof runoff is dispersed on the up gradient side of a structure in accordance
with the design criteria in “Downspout Dispersion”, model the tributary roof area as
pasture on the native soil.
• Where “step forming” is used on a slope, the square footage of roof that can be
modeled as pasture must be reduced to account for lost soils. In “step forming,” the
building area is terraced in cuts of limited depth. This results in a series of level
plateaus on which to erect the form boards.
The following equation can be used to reduce the roof area that can be modeled as pasture.
A1 – dC(.5) X A1 = A2
dP
A1 = roof area draining to up gradient side of structure
dC = depth of cuts into the soil profile
dP = permeable depth of soil (the A horizon plus an additional few inches of the
B horizon where roots permeate into ample pore space of soil).
A2 = roof area that can be modeled as pasture on the native soil
• If roof runoff is dispersed down gradient of the structure in accordance with the
design criteria and guidelines “Downspout Dispersion”, and there is at least 50 feet of
vegetated flow path through native material or lawn/landscape area that meets the
guidelines in BMP L613 of Volume 5, Chapter 5, model the tributary roof areas as
landscaped area.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Low Impact Development Volume VI
Best Management Practices Chapter 2 787
2.2.3.6 BMP L635 Reverse Slope Sidewalks
Definition and Purpose
Reverse slope sidewalks are sloped to drain away from the road and onto adjacent vegetated areas.
Design Criteria for Reverse Slope Sidewalks
• There must be 10 feet of vegetated surface downslope that is not directly
connected into the storm drainage system.
• Vegetated area receiving flow from sidewalk must be native soil or meet the
guidelines in BMP L613: Post-Construction Soil Quality and Depth.
Flow Credits for Reverse Slope Sidewalks
• Model the sidewalk area as landscaped area over the underlying soil type.
THIS PAGE INTENTIONALLY LEFT BLANK.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
789
Glossary
The following terms are provided for reference and use with this manual. They shall be superseded
by any other definitions for these terms adopted by ordinance, unless they are defined in a
Washington State WAC or RCW, or are used and defined as part of the Minimum Requirements for
all new development and redevelopment.
Term Definition
AASHTO classification The official classification of soil materials and soil aggregate mixtures for
highway construction, used by the American Association of State Highway and
Transportation Officials.
ACC Auburn City Code.
Absorption The penetration of a substance into or through another, such as the dissolving
of a soluble gas in a liquid.
Adjacent steep slope A slope with a gradient of 20 percent or steeper within five hundred feet of the
site.
Adjustment A variation in the application of a Minimum Requirement to a particular project.
Adjustments provide equivalent environmental protection.
Adsorption The adhesion of a substance to the surface of a solid or liquid; often used to
extract pollutants by causing them to be attached to such adsorbents as
activated carbon or silica gel. Hydrophobic, or water-repulsing adsorbents, are
used to extract oil from waterways when oil spills occur. Heavy metals such as
zinc and lead often adsorb onto sediment particles.
Aeration The process of being supplied or impregnated with air. In waste treatment, the
process used to foster biological and chemical purification. In soils, the process
by which air in the soil is replenished by air from the atmosphere. In a well
aerated soil, the soil air is similar in composition to the atmosphere above the
soil. Poorly aerated soils usually contain a much higher percentage of carbon
dioxide and a correspondingly lower percentage of oxygen.
Aerobic Living or active only in the presence of free (dissolved or molecular) oxygen.
Aerobic bacteria Bacteria that require the presence of free oxygen for their metabolic processes.
Aggressive plant species Opportunistic species of inferior biological value that tend to out-compete more
desirable forms and become dominant; applied to native species in this manual.
Algae Primitive plants, many microscopic, containing chlorophyll and forming the base
of the food chain in aquatic environments. Some species may create a nuisance
when environmental conditions are suitable for prolific growth.
Algal bloom Proliferation of living algae on the surface of lakes, streams or ponds; often
stimulated by phosphate over-enrichment. Algal blooms reduce the oxygen
available to other aquatic organisms.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
790
Term Definition
American Public Works
Association (APWA)
The Washington State Chapter of the American Public Works Association.
Anadromous Fish that grow to maturity in the ocean and return to rivers for spawning.
Anaerobic Living or active in the absence of oxygen.
Anaerobic bacteria Bacteria that do not require the presence of free or dissolved oxygen for
metabolism.
Annual flood The highest peak discharge on average which can be expected in any given
year.
Antecedent moisture
conditions
The degree of wetness of a watershed or within the soil at the beginning of a
storm.
Anti-seep collar A device constructed around a pipe or other conduit and placed through a dam,
levee, or dike for the purpose of reducing seepage losses and piping failures.
Anti-vortex device A facility placed at the entrance to a pipe conduit structure such as a drop inlet
spillway or hood inlet spillway to prevent air from entering the structure when the
pipe is flowing full.
Applicable BMPs As used in Volume 4, applicable BMPs are those source control BMPs that are
expected to be required by local governments at new development and
redevelopment sites. Applicable BMPs will also be required if they are
incorporated into NPDES permits, or they are included by local governments in
a stormwater program for existing facilities.
Applicant The person who has applied for a development permit or approval.
Appurtenances Machinery, appliances, or auxiliary structures attached to a main structure, but
not considered an integral part thereof, for the purpose of enabling it to function.
Aquifer A geologic stratum containing groundwater that can be withdrawn and used for
human purposes.
Arterial A road or street primarily for through traffic. A major arterial connects an
Interstate Highway to cities and counties. A minor arterial connects major
arterials to collectors. A collector connects an arterial to a neighborhood. A
collector is not an arterial. A local access road connects individual homes to a
collector.
As-built drawings Engineering plans which have been revised to reflect all changes to the plans
which occurred during construction.
As-graded The extent of surface conditions on completion of grading.
BSBL See Building set back line.
Background A description of pollutant levels arising from natural sources, and not due to
human activities.
Backwater Water upstream from an obstruction which is deeper than it would normally be
without the obstruction.
Baffle A device to check, deflect, or regulate flow.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
791
Term Definition
Bank full discharge A flow condition where streamflow completely fills the stream channel up to the
top of the bank. In undisturbed watersheds, the discharge conditions occur on
average every 1.5 to 2 years and controls the shape and form of natural
channels.
Base flood A flood having a one percent chance of being equaled or exceeded in any given
year. This is also referred to as the 100-year flood.
Base flood elevation The water surface elevation of the base flood. It shall be referenced to the
National Geodetic Vertical Datum of 1929 (NGVD).
Baseline sample A sample collected during dry-weather flow (i.e., it does not consist of runoff
from a specific precipitation event).
Basin plan A plan that assesses, evaluates, and proposes solutions to existing and
potential future impacts to the beneficial uses of, and the physical, chemical,
and biological properties of waters of the state within a basin. Basins typically
range in size from 1 to 50 square miles. A plan should include but not be limited
to recommendations for:
• Stormwater requirements for new development and
redevelopment;
• Capital improvement projects;
• Land Use management through identification and protection
of critical areas, comprehensive land use and transportation
plans, zoning regulations, site development standards, and
conservation areas;
• Source control activities including public education and
involvement, and business programs;
• Other targeted stormwater programs and activities, such as
maintenance, inspections and enforcement;
• Monitoring; and
• An implementation schedule and funding strategy.
A plan that is “adopted and implemented” must have the following
characteristics:
• It must be adopted by legislative or regulatory action of
jurisdictions with responsibilities under the plan;
• Ordinances, regulations, programs, and procedures
recommended by the plan should be in effect or on schedule
to be in effect; and,
• An implementation schedule and funding strategy that are in
progress.
Bearing capacity The maximum load that a material can support before failing.
Bedrock The more or less solid rock in place either on or beneath the surface of the
earth. It may be soft, medium, or hard and have a smooth or irregular surface.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
792
Term Definition
Bench A relatively level step excavated into earth material on which fill is to be placed.
Berm A constructed barrier of compacted earth, rock, or gravel. In a stormwater
facility, a berm may serve as a vertical divider typically built up from the bottom.
Best management
practice (BMP)
The schedules of activities, prohibitions of practices, maintenance
procedures, and structural and/or managerial practices, that when used
singly or in combination, prevent or reduce the release of pollutants and other
adverse impacts to waters of Washington State.
Biochemical oxygen
demand (BOD)
An indirect measure of the concentration of biologically degradable materials
present in organic wastes. The amount of free oxygen utilized by aerobic
organisms when allowed to attack the organic material in an aerobically
maintained environment at a specified temperature (20°C) for a specific time
period (5 days), and thus stated as BOD5. It is expressed in milligrams of
oxygen utilized per liter of liquid waste volume (mg/l) or in milligrams of oxygen
per kilogram of waste solution (mg/kg = ppm = parts per million parts). Also
called biological oxygen demand.
Biodegradable Capable of being readily broken down by biological means, especially by
microbial action. Microbial action includes the combined effect of bacteria,
fungus, flagellates, amoebae, ciliates, and nematodes. Degradation can be
rapid or may take many years depending upon such factors as available oxygen
and moisture.
Bioengineering The combination of biological, mechanical, and ecological concepts (and
methods) to control erosion and stabilize soil through the use of vegetation or in
combination with construction materials.
Biofilter A designed treatment facility using a combined soil and vegetation system for
filtration, infiltration, adsorption, and biological uptake of pollutants in stormwater
when runoff flows over and through. Vegetation growing in these facilities acts
as both a physical filter which causes gravity settling of particulates by
regulating velocity of flow, and also as a biological sink when direct uptake of
dissolved pollutants occurs. The former mechanism is probably the most
important in western Washington where the period of major runoff coincides with
the period of lowest biological activity.
Biofiltration The process of reducing pollutant concentrations in water by filtering the
polluted water through biological materials.
Biological control A method of controlling pest organisms by means of introduced or naturally
occurring predatory organisms, sterilization, the use of inhibiting hormones, or
other means, rather than by mechanical or chemical means.
Biological magnification The increasing concentration of a substance along succeeding steps in a food
chain. Also called biomagnification.
Bollard A post (may or may not be removable) used to prevent vehicular access.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
793
Term Definition
Bond A surety bond, cash deposit or escrow account, assignment of savings,
irrevocable letter of credit or other means acceptable to or required by the
manager to guarantee that work is completed in compliance with the project's
drainage plan and in compliance with all local government requirements.
Borrow area A source of earth fill material used in the construction of embankments or other
earth fill structures.
Buffer The zone contiguous with a sensitive area that is required for the continued
maintenance, function, and structural stability of the sensitive area. The critical
functions of a riparian buffer (those associated with an aquatic system) include
shading, input of organic debris and coarse sediments, uptake of nutrients,
stabilization of banks, interception of fine sediments, overflow during high water
events, protection from disturbance by humans and domestic animals,
maintenance of wildlife habitat, and room for variation of aquatic system
boundaries over time due to hydrologic or climatic effects. The critical functions
of terrestrial buffers include protection of slope stability, attenuation of surface
water flows from stormwater runoff and precipitation, and erosion control.
Building setback line
(BSBL)
A line measured parallel to a property, easement, drainage facility, or buffer
boundary, that delineates the area (defined by the distance of separation) where
buildings or other obstructions are prohibited (including decks, patios,
outbuildings, or overhangs beyond 18 inches). Wooden or chain link fences and
landscaping are allowable within a building setback line. In this manual the
minimum building setback line shall be 5 feet.
Capital Improvement
Project or Program (CIP)
A project prioritized and scheduled as a part of an overall construction program
or, the actual construction program.
Catch basin A chamber or well, usually built at the curb line of a street, for the admission of
surface water to a sewer or subdrain, having at its base a sediment sump
designed to retain grit and detritus below the point of overflow.
Catchline The point where a severe slope intercepts a different, more gentle slope.
Catchment Surface drainage area.
Cation Exchange
Capacity (CEC)
The amount of exchangeable cations that a soil can adsorb at pH 7.0.
Certified Erosion and
Sediment Control Lead
(CESCL)
An individual who is knowledgeable in the principles and practices of erosion
and sediment control. The CESCL must have the skills to assess: the site
conditions and construction activities that could impact the quality of the
stormwater; and the effectiveness of erosion and sediment control measures
used to control the quality of stormwater discharges. The CESCL must have
current certification through an approved erosion and sediment control training
program that meets the minimum training standards established by Ecology.
Channel A feature that conveys surface water and is open to the air.
Channel, constructed Channels or ditches constructed (or reconstructed natural channels) to convey
surface water.
Channel, natural Streams, creeks, or swales that convey surface/groundwater and have existed
long enough to establish a stable route and/or biological community.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
794
Term Definition
Channel stabilization Erosion prevention and stabilization of velocity distribution in a channel using
vegetation, jetties, drops, revetments, and/or other measures.
Channel storage Water temporarily stored in channels while enroute to an outlet.
Channelization Alteration of a stream channel by widening, deepening, straightening, cleaning,
or paving certain areas to change flow characteristics.
Check dam Small dam constructed in a gully or other small watercourse to decrease the
streamflow velocity, minimize channel scour, and promote deposition of
sediment.
Chemical oxygen
demand (COD)
A measure of the amount of oxygen required to oxidize organic and oxidizable
inorganic compounds in water. The COD test, like the BOD test, is used to
determine the degree of pollution in water.
Civil engineer A professional engineer licensed in the State of Washington in Civil
Engineering.
Civil engineering The application of the knowledge of the forces of nature, principles of
mechanics and the properties of materials to the evaluation, design and
construction of civil works for the beneficial uses of mankind.
Clay lens A naturally-occurring localized area of clay which acts as an impermeable layer
to runoff infiltration.
Clearing The destruction and removal of vegetation by manual, mechanical, or chemical
methods.
Closed depression An area which is low-lying and either has no, or such a limited, surface water
outlet that during storm events the area acts as a retention basin.
Cohesion The capacity of a soil to resist shearing stress, exclusive of functional
resistance.
Coliform bacteria Microorganisms common in the intestinal tracts of man and other warm-blooded
animals; all the aerobic and facultative anaerobic, gram-negative, nonspore-
forming, rod-shaped bacteria which ferment lactose with gas formation within
48 hours at 35°C. Used as an indicator of bacterial pollution.
Commercial agriculture Those activities conducted on lands defined in RCW 84.34.020(2), and activities
involved in the production of crops or livestock for wholesale trade. An activity
ceases to be considered commercial agriculture when the area on which it is
conducted is proposed for conversion to a nonagricultural use or has lain idle for
more than five (5) years, unless the idle land is registered in a federal or state
soils conservation program, or unless the activity is maintenance of irrigation
ditches, laterals, canals, or drainage ditches related to an existing and ongoing
agricultural activity.
Commercial sites Sites as defined in Title 18 of ACC.
Compaction The densification, settlement, or packing of soil in such a way that permeability
of the soil is reduced. Compaction effectively shifts the performance of a
hydrologic group to a lower permeability hydrologic group. For example, a group
B hydrologic soil can be compacted and be effectively converted to a group C
hydrologic soil in the way it performs in regard to runoff.
Compaction may also refer to the densification of a fill by mechanical means.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
795
Term Definition
Compensatory storage New excavated storage volume equivalent to the flood storage capacity
eliminated by filling or grading within the flood fringe. Equivalent shall mean that
the storage removed shall be replaced by equal volume between corresponding
one-foot contour intervals that are hydraulically connected to the floodway
through their entire depth.
Compost Organic residue or a mixture of organic residues and soil, that has undergone
biological decomposition until it has become relatively stable humus.
Composted Mulch Mulch prepared from decomposed organic materials that have undergone a
controlled process to minimize weed seeds. Acceptable feedstocks include, but
are not limited to, yard debris, wood waste, land clearing debris, brush, and
branches.
Composting A controlled process of degrading organic matter by microorganisms. Present
day composting is the aerobic, hemophilic decomposing of organic waste to
relatively stable humus. Composting is the process of making usable, organic
matter that is beneficial to plants and has converted nutrients into slow-release
forms (versus mineralized water-soluble forms found in fertilizer).
Comprehensive planning Planning that takes into account all aspects of water, air, and land resources
and their uses and limits.
Conservation district A public organization created under state enabling law as a special-purpose
district to develop and carry out a program of soil, water, and related resource
conservation, use, and development within its boundaries, usually a subdivision
of state government with a local governing body and always with limited
authority. Often called a soil conservation district or a soil and water
conservation district.
Constructed wetland Those wetlands intentionally created on sites that are not wetlands for the
primary purpose of wastewater or stormwater treatment and managed as such.
Constructed wetlands are normally considered as part of the stormwater
collection and treatment system.
Contour An imaginary line on the surface of the earth connecting points of the same
elevation.
Conveyance A mechanism for transporting water from one point to another, including pipes,
ditches, and channels.
Conveyance system The drainage facilities, both natural and man-made, which collect, contain, and
provide for the flow of surface and stormwater from the highest points on the
land down to a receiving water. The natural elements of the conveyance system
include swales and small drainage courses, streams, rivers, lakes, and
wetlands. The human-made elements of the conveyance system include
gutters, ditches, pipes, channels, and most retention/detention facilities.
Cover crop A close-growing crop grown primarily for the purpose of protecting and
improving soil between periods of permanent vegetation.
Created wetland Means those wetlands intentionally created from nonwetland sites to produce or
replace natural wetland habitat (e.g., compensatory mitigation projects).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
796
Term Definition
Critical Areas At a minimum, areas which include wetlands, areas with a critical recharging
effect on aquifers used for potable water, fish and wildlife habitat conservation
areas, frequently flooded areas, geologically hazardous areas, including
unstable slopes, and associated areas and ecosystems.
Critical Drainage Area An area with such severe flooding, drainage and/or erosion/sedimentation
conditions that the area has been formally adopted as a Critical Drainage Area
by rule under the procedures specified in an ordinance.
Critical reach The point in a receiving stream below a discharge point at which the lowest
dissolved oxygen level is reached and stream recovery begins.
Culvert Pipe or concrete box structure that drains open channels, swales or ditches
under a roadway or embankment. Typically with no catchbasins or manholes
along its length.
Cut Portion of land surface or area from which earth has been removed or will be
removed by excavating; the depth below original ground surface to excavated
surface.
Cut-and-fill Process of earth moving by excavating part of an area and using the excavated
material for adjacent embankments or fill areas.
Cut slope A slope formed by excavating overlying material to connect the original ground
surface with a lower ground surface created by the excavation. A cut slope is
distinguished from a bermed slope, which is constructed by importing soil to
create the slope.
DNS See Determination of Nonsignificance.
Dead storage The volume available in a depression in the ground below any conveyance
system, or surface drainage pathway, or outlet invert elevation that could allow
the discharge of surface and stormwater runoff.
Dedication of land Refers to setting aside a portion of a property for a specific use or function.
Degradation (Biological or chemical) The breakdown of complex organic or other chemical
compounds into simpler substances, usually less harmful than the original
compound, as with the degradation of a persistent pesticide. (Geological)
Wearing down by erosion. (Water) The lowering of the water quality of a
watercourse by an increase in the pollutant loading.
Degraded (disturbed)
wetland (community)
A wetland (community) in which the vegetation, soils, and/or hydrology have
been adversely altered, resulting in lost or reduced functions and values;
generally, implies topographic isolation; hydrologic alterations such as
hydroperiod alteration (increased or decreased quantity of water), diking,
channelization, and/or outlet modification; soils alterations such as presence of
fill, soil removal, and/or compaction; accumulation of toxicants in the biotic or
abiotic components of the wetland; and/or low plant species richness with
dominance by invasive weedy species.
Denitrification The biochemical reduction of nitrates or nitrites in the soil or organic deposits to
ammonia or free nitrogen.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
797
Term Definition
Depression storage The amount of precipitation that is trapped in depressions on the surface of the
ground.
Design engineer The professional civil engineer licensed in the State of Washington who
prepares the analysis, design, and engineering plans for an applicant's permit or
approval submittal.
Design storm A prescribed hyetograph and total precipitation amount (for a specific duration
recurrence frequency) used to estimate runoff for a hypothetical storm of
interest or concern for the purposes of analyzing existing drainage, designing
new drainage facilities or assessing other impacts of a proposed project on the
flow of surface water. (A hyetograph is a graph of percentages of total
precipitation for a series of time steps representing the total time during which
the precipitation occurs.)
Detention The release of stormwater runoff from the site at a slower rate than it is collected
by the stormwater facility system, the difference being held in temporary
storage.
Detention facility An above or below ground facility, such as a pond or tank, that temporarily
stores stormwater runoff and subsequently releases it at a slower rate than it is
collected by the drainage facility system. There is little or no infiltration of stored
stormwater.
Detention time The theoretical time required to displace the contents of a stormwater treatment
facility at a given rate of discharge (volume divided by rate of discharge).
Determination of
Nonsignificance (DNS)
The written decision by the responsible official of the lead agency that a
proposal is not likely to have a significant adverse environmental impact, and
therefore an EIS is not required.
Development Means new development, redevelopment, or both. See definitions for each.
Discharge Runoff leaving a new development or redevelopment via overland flow, built
conveyance systems, or infiltration facilities. A hydraulic rate of flow, specifically
fluid flow; a volume of fluid passing a point per unit of time, commonly
expressed as cubic feet per second, cubic meters per second, gallons per
minute, gallons per day, or millions of gallons per day.
Dispersion Release of surface and stormwater runoff from a drainage facility system such
that the flow spreads over a wide area and is located so as not to allow flow to
concentrate anywhere upstream of a drainage channel with erodible underlying
granular soils.
Ditch A long narrow excavation dug in the earth for drainage with its top width less
than 10 feet at design flow.
Divide, Drainage The boundary between one drainage basin and another.
Drain A buried pipe or other conduit (closed drain). A ditch (open drain) for carrying off
surplus surface water or groundwater.
(To) Drain To provide channels, such as open ditches or closed drains, so that excess
water can be removed by surface flow or by internal flow. To lose water (from
the soil) by percolation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
798
Term Definition
Drainage Refers to the collection, conveyance, containment, and/or discharge of surface
and stormwater runoff.
Drainage basin A geographic and hydrologic subunit of a watershed.
Drainage channel A drainage pathway with a well-defined bed and banks indicating frequent
conveyance of surface and stormwater runoff.
Drainage course A pathway for watershed drainage characterized by wet soil vegetation; often
intermittent in flow.
Drainage easement A legal encumbrance that is placed against a property's title to reserve specified
privileges for the users and beneficiaries of the drainage facilities contained
within the boundaries of the easement.
Drainage pathway The route that surface and stormwater runoff follows downslope as it leaves any
part of the site.
Drainage review An evaluation by City development review staff of a proposed project's
compliance with the drainage requirements in this manual or its technical
equivalent.
Drainage, Soil As a natural condition of the soil, soil drainage refers to the frequency and
duration of periods when the soil is free of saturation; for example, in well-
drained soils the water is removed readily but not rapidly; in poorly drained soils
the root zone is waterlogged for long periods unless artificially drained, and the
roots of ordinary crop plants cannot get enough oxygen; in excessively drained
soils the water is removed so completely that most crop plants suffer from lack
of water. Strictly speaking, excessively drained soils are a result of excessive
runoff due to steep slopes or low available water-holding capacity due to small
amounts of silt and clay in the soil material. The following classes are used to
express soil drainage:
• Well drained - Excess water drains away rapidly and no
mottling occurs within 36 inches of the surface.
• Moderately well drained - Water is removed from the soil
somewhat slowly, resulting in small but significant periods of
wetness. Mottling occurs between 18 and 36 inches.
• Somewhat poorly drained - Water is removed from the soil
slowly enough to keep it wet for significant periods but not all
of the time. Mottling occurs between 8 and 18 inches.
• Poorly drained - Water is removed so slowly that the soil is
wet for a large part of the time. Mottling occurs between 0
and 8 inches.
• Very poorly drained - Water is removed so slowly that the
water table remains at or near the surface for the greater part
of the time. There may also be periods of surface ponding.
The soil has a black to gray surface layer with mottles up to
the surface.
Drawdown Lowering of the water surface (in open channel flow), water table or piezometric
surface (in groundwater flow) resulting from a withdrawal of water.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
799
Term Definition
Drop-inlet spillway Overall structure in which the water drops through a vertical riser connected to a
discharge conduit.
Drop spillway Overall structure in which the water drops over a vertical wall onto an apron at a
lower elevation.
Drop structure A structure for dropping water to a lower level and dissipating its surplus energy;
a fall. A drop may be vertical or inclined.
Dry weather flow The combination of groundwater seepage and allowed non-stormwater flows
found in storm sewers during dry weather. Also that flow in streams during the
dry season.
EIS See Environmental Impact Statement.
ESC Erosion and Sediment Control (Plan).
Earth material Any rock, natural soil or fill and/or any combination thereof. Earth material shall
not be considered topsoil used for landscape purposes. Topsoil used for
landscaped purposes shall comply with ASTM D 5268 specifications.
Engineered soil/landscape systems are also defined independently.
Easement The legal right to use a parcel of land for a particular purpose. It does not
include fee ownership, but may restrict the owners use of the land.
Effective Impervious
Surface
Those impervious surfaces that are connected via sheet flow or discrete
conveyance to a drainage system. Impervious surfaces on residential
development sites are considered ineffective if the runoff is dispersed through at
least one hundred feet of native vegetation in accordance with BMP L614 - “Full
Dispersion,” as described in Chapter 2 of Volume 6. Impervious surfaces
infiltrated according to this manual are also considered ineffective.
Embankment A structure of earth, gravel, or similar material raised to form a pond bank or
foundation for a road.
Emergent plants Aquatic plants that are rooted in the sediment but whose leaves are at or above
the water surface. These wetland plants often have high habitat value for wildlife
and waterfowl, and can aid in pollutant uptake.
Emergency spillway A vegetated earth channel used to safely convey flood discharges in excess of
the capacity of the principal spillway.
Emerging technology Treatment technologies that are currently being evaluated for performance.
Energy dissipater Any means by which the total energy of flowing water is reduced. In stormwater
design, they are usually mechanisms that reduce velocity prior to, or at,
discharge from an outfall in order to prevent erosion. They include rock splash
pads, drop manholes, concrete stilling basins or baffles, and check dams.
Energy gradient The slope of the specific energy line (i.e., the sum of the potential and velocity
heads).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
800
Term Definition
Engineered soil/
landscape system
This is a self-sustaining soil and plant system that simultaneously supports plant
growth, soil microbes, water infiltration, nutrient and pollutant adsorption,
sediment and pollutant biofiltration, water interflow, and pollution decomposition.
The system shall be protected from compaction and erosion. The system shall
be planted and/or mulched as part of the installation.
The engineered soil/plant system shall have the following characteristics:
• Be protected from compaction and erosion.
• Have a plant system to support a sustained soil quality.
• Possess permeability characteristics of not less than 6.0, 2.0,
and 0.6 inches/hour for hydrologic soil groups A, B, and C,
respectively (per ASTM D 3385). D is less than 0.6
inches/hour.
• Possess minimum percent organic matter of 12, 14, 16, and
18 percent (dry-weight basis) for hydrologic soil groups A, B,
C, and D, respectively (per ASTM D 2974).
Engineering geology The application of geologic knowledge and principles in the investigation and
evaluation of naturally occurring rock and soil for use in the design of civil works.
Engineering plan A plan prepared and stamped by a professional civil engineer.
Enhancement To raise value, desirability, or attractiveness of an environment associated with
surface water.
Environmental Impact
Statement (EIS)
A document that discusses the likely significant adverse impacts of a proposal,
ways to lessen the impacts, and alternatives to the proposal. They are required
by the national and state environmental policy acts when projects are
determined to have significant environmental impact.
Erodible granular soils Soil materials that are easily eroded and transported by running water, typically
fine or medium grained sand with minor gravel, silt, or clay content. Such soils
are commonly described as Everett or Indianola series soil types in the SCS
classification. Also included are any soils showing examples of existing severe
stream channel incision as indicated by unvegetated streambanks standing over
two feet high above the base of the channel.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
801
Term Definition
Erosion The wearing away of the land surface by running water, wind, ice, or other
geological agents, including such processes as gravitational creep. Also,
detachment and movement of soil or rock fragments by water, wind, ice, or
gravity. The following terms are used to describe different types of water
erosion:
• Accelerated erosion - Erosion much more rapid than
normal or geologic erosion, primarily as a result of the
influence of the activities of man or, in some cases, of the
animals or natural catastrophes that expose bare surfaces
(e.g., fires).
• Geological erosion - The normal or natural erosion caused
by geological processes acting over long geologic periods
and resulting in the wearing away of mountains, the building
up of floodplains, coastal plains, etc. Synonymous with
natural erosion.
• Gully erosion - The erosion process whereby water
accumulates in narrow channels and, over short periods,
removes the soil from this narrow area to considerable
depths, ranging from 1 to 2 feet to as much as 75 to 100 feet.
• Natural erosion - Wearing away of the earth's surface by
water, ice, or other natural agents under natural
environmental conditions of climate, vegetation, etc.,
undisturbed by man. Synonymous with geological erosion.
• Normal erosion - The gradual erosion of land used by man
which does not greatly exceed natural erosion.
• Rill erosion - An erosion process in which numerous small
channels only several inches deep are formed; occurs mainly
on recently disturbed and exposed soils. See Rill.
• Sheet erosion - The removal of a fairly uniform layer of soil
from the land surface by runoff.
• Splash erosion - The spattering of small soil particles
caused by the impact of raindrops on wet soils. The loosened
and spattered particles may or may not be subsequently
removed by surface runoff.
Erosion classes (soil
survey)
A grouping of erosion conditions based on the degree of erosion or on
characteristic patterns. Applied to accelerated erosion, not to normal, natural, or
geological erosion. Four erosion classes are recognized for water erosion and
three for wind erosion.
Erosion and
sedimentation control
Any temporary or permanent measures taken to reduce erosion; control siltation
and sedimentation; and ensure that sediment-laden water does not leave the
site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
802
Term Definition
Erosion and sediment
control facility
A type of drainage facility designed to hold water for a period of time to allow
sediment contained in the surface and stormwater runoff directed to the facility
to settle out so as to improve the quality of the runoff.
Escarpment A steep face or a ridge of high land.
Estuarine wetland Generally, an eelgrass bed; salt marsh; or rocky, sandflat, or mudflat intertidal
area where fresh and salt water mix. (Specifically, a tidal wetland with salinity
greater than 0.5 parts per thousand, usually semi-enclosed by land but with
partially obstructed or sporadic access to the open ocean).
Estuary An area where fresh water meets salt water, or where the tide meets the river
current (e.g., bays, mouths of rivers, salt marshes and lagoons). Estuaries serve
as nurseries and spawning and feeding grounds for large groups of marine life
and provide shelter and food for birds and wildlife.
Eutrophication Refers to the process where nutrient over-enrichment of water leads to
excessive growth of aquatic plants, especially algae.
Evapotranspiration The collective term for the processes of evaporation and plant transpiration by
which water is returned to the atmosphere.
Excavation The mechanical removal of earth material.
Exception Relief from the application of a Minimum Requirement to a project.
Exfiltration The downward movement of runoff through the bottom of an infiltration BMP
into the soil layer or the downward movement of water through soil.
Existing site condition Actual land coverage of the site at the time of proposed development.
FIRM See Flood Insurance Rate Map.
Fertilizer Any material or mixture used to supply one or more of the essential plant
nutrient elements.
Field Capacity Amount of soil moisture or water content held in soul after excess water has
drained away and the rate of downward movement has materially decreased.
Fill A deposit of earth material placed by artificial means.
Filter fabric A woven or non-woven, water-permeable material generally made of synthetic
products such as polypropylene and used in stormwater management and
erosion and sediment control applications to trap sediment or prevent the
clogging of aggregates by fine soil particles.
Filter fabric fence A temporary sediment barrier consisting of a filter fabric stretched across and
attached to supporting posts and entrenched. The filter fence is constructed of
stakes and synthetic filter fabric with a rigid wire fence backing where necessary
for support.
Filter strip A grassy area with gentle slopes that treats stormwater runoff from adjacent
paved areas before it concentrates into a discrete channel.
Flocculation The process by which suspended colloidal or very fine particles are assembled
into larger masses or floccules which eventually settle out of suspension. This
process occurs naturally but can also be caused through the use of such
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
803
Term Definition
chemicals as alum.
Flood An overflow or inundation that comes from a river or any other source, including
(but not limited to) streams, tides, wave action, storm drains, or excess rainfall.
Any relatively high stream flow overtopping the natural or artificial banks in any
reach of a stream.
Flood control Methods or facilities for reducing flood flows and the extent of flooding.
Flood control project A structural system installed to protect land and improvements from floods by
the construction of dikes, river embankments, channels, or dams.
Flood frequency The frequency with which the flood of interest may be expected to occur at a
site in any average interval of years. Frequency analysis defines the "n-year
flood" as being the flood that will, over a long period of time, be equaled or
exceeded on the average once every "n" years.
Flood fringe That portion of the floodplain outside of the floodway which is covered by
floodwaters during the base flood; it is generally associated with slower moving
or standing water rather than rapidly flowing water.
Flood hazard areas Those areas subject to inundation by the base flood. Includes, but is not limited
to streams, lakes, wetlands, and closed depressions.
Flood Insurance Rate
Map (FIRM)
The official map on which the Federal Emergency Management Agency has
delineated many areas of flood hazard, floodway, and the risk premium zones.
Flood Insurance Study The official report provided by the Federal Emergency Management Agency
that includes flood profiles and the FIRM.
Flood peak The highest value of the stage or discharge attained by a flood; thus, peak stage
or peak discharge.
Floodplain The total area subject to inundation by a flood including the flood fringe and
floodway.
Flood-proofing Adaptations that ensure a structure is substantially impermeable to the passage
of water below the flood protection elevation that resists hydrostatic and
hydrodynamic loads and effects of buoyancy.
Flood protection
elevation
The base flood elevation or higher as defined by the local government.
Flood protection facility Any levee, berm, wall, enclosure, raise bank, revetment, constructed bank
stabilization, or armoring, that is commonly recognized by the community as
providing significant protection to a property from inundation by flood waters.
Flood routing An analytical technique used to compute the effects of system storage
dynamics on the shape and movement of flow represented by a hydrograph.
Flood stage The stage at which overflow of the natural banks of a stream begins.
Floodway The channel of the river or stream and those portions of the adjoining
floodplains that are reasonably required to carry and discharge the base flood
flow. The portions of the adjoining floodplains which are considered to be
"reasonably required" is defined by flood hazard regulations.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
804
Term Definition
Flow control facility A drainage facility designed to mitigate the impacts of increased surface and
stormwater runoff flow rates generated by development. Flow control facilities
are designed either to hold water for a considerable length of time and then
release it by evaporation, plant transpiration, and/or infiltration into the ground,
or to hold runoff for a short period of time, releasing it to the conveyance system
at a controlled rate.
Flow duration The aggregate time that peak flows are at or above a particular flow rate of
interest. For example, the amount of time that peak flows are at or above 50%
of the 2-year peak flow rate for a period of record.
Flow frequency The inverse of the probability that the flow will be equaled or exceeded in any
given year (the exceedance probability). For example, if the exceedance
probability is 0.01 or 1 in 100, that flow is referred to as the 100-year flow.
Flow path The route that stormwater runoff follows between two points of interest.
Forebay An easily maintained, extra storage area provided near an inlet of a BMP to trap
incoming sediments before they accumulate in a pond or wetland BMP.
Forest practice Any activity conducted on or directly pertaining to forest land and relating to
growing, harvesting, or processing timber, including but not limited to:
• Road and trail construction.
• Harvesting, final and intermediate.
• Precommercial thinning.
• Reforestation.
• Fertilization.
• Prevention and suppression of diseases and insects.
• Salvage of trees.
• Brush control.
Forested communities
(wetlands)
In general terms, communities (wetlands) characterized by woody vegetation
that is greater than or equal to 6 meters in height; in this manual the term
applies to such communities (wetlands) that represent a significant amount of
tree cover consisting of species that offer wildlife habitat and other values and
advance the performance of wetland functions overall.
Freeboard The vertical distance between the design water surface elevation and the
elevation of the barrier that contains the water.
Frequently flooded areas The 100-year floodplain designations of the Federal Emergency Management
Agency and the National Flood Insurance Program or as defined by the local
government.
Frost-heave The upward movement of soil surface due to the expansion of water stored
between particles in the first few feet of the soil profile as it freezes. May cause
surface fracturing of asphalt or concrete.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
805
Term Definition
Frequency of storm
(design storm frequency)
The anticipated period in years that will elapse, based on average probability of
storms in the design region, before a storm of a given intensity and/or total
volume will recur; thus a 10-year storm can be expected to occur on the
average once every 10 years. Sewers designed to handle flows that occur
under such storm conditions would be expected to be surcharged by any storms
of greater amount or intensity
Functions The ecological (physical, chemical, and biological) processes or attributes of a
wetland without regard for their importance to society (see also values). Wetland
functions include food chain support, provision of ecosystem diversity and fish
and wildlife habitat, floodflow alteration, groundwater recharge and discharge,
water quality improvement, and soil stabilization.
Gabion A rectangular or cylindrical wire mesh cage (a chicken wire basket) filled with
rock and used as a protecting agent, revetment, etc., against erosion. Soft
gabions, often used in streambank stabilization, are made of geotextiles filled
with dirt, in between which cuttings are placed.
Gage or gauge A device for registering precipitation, water level, discharge, velocity, pressure,
temperature, etc. Also, a measure of the thickness of metal; e.g., diameter of
wire, wall thickness of steel pipe.
Gauging station A selected section of a stream channel equipped with a gauge, recorder, or
other facilities for determining stream discharge.
Geologist A person who has earned a degree in geology from an accredited college or
university or who has equivalent educational training and has at least five years
of experience as a practicing geologist or four years of experience and at least
two years post-graduate study, research or teaching. The practical experience
shall include at least three years work in applied geology and landslide
evaluation, in close association with qualified practicing geologists or
geotechnical professional/civil engineers.
Geologically hazardous
areas
Areas that, because of their susceptibility to erosion, sliding, earthquake, or
other geological events, are not suited to the siting of commercial, residential, or
industrial development consistent with public health or safety concerns.
Geometrics The mathematical relationships between points, lines, angles, and surfaces
used to measure and identify areas of land.
Geotechnical
professional civil
engineer
A practicing, geotechnical/civil engineer licensed as a professional Civil
Engineer with the State of Washington who has at least four years of
professional employment as a geotechnical engineer in responsible charge,
including experience with landslide evaluation.
Grade The slope of a road, channel, or natural ground. The finished surface of a canal
bed, roadbed, top of embankment, or bottom of excavation; any surface
prepared for the support of construction such as paving or the laying of a
conduit.
(To) Grade To finish the surface of a canal bed, roadbed, top of embankment or bottom of
excavation.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
806
Term Definition
Gradient terrace An earth embankment or a ridge-and-channel constructed with suitable spacing
and an acceptable grade to reduce erosion damage by intercepting surface
runoff and conducting it to a stable outlet at a stable nonerosive velocity.
Grassed waterway A natural or constructed waterway, usually broad and shallow, covered with
erosion-resistant grasses, used to conduct surface water from an area at a
reduced flow rate. See also biofilter.
Groundwater Water in a saturated zone or stratum beneath the land surface or a surface
waterbody.
Groundwater recharge Inflow to a groundwater reservoir.
Groundwater table The free surface of the groundwater, that surface subject to atmospheric
pressure under the ground, generally rising and falling with the season, the rate
of withdrawal, the rate of restoration, and other conditions. It is seldom static.
Gully A channel caused by the concentrated flow of surface and stormwater runoff
over unprotected erodible land.
Habitat The specific area or environment in which a particular type of plant or animal
lives. An organism's habitat must provide all of the basic requirements for life
and should be protected from harmful biological, chemical, and physical
alterations.
Hardpan A cemented or compacted and often clay-like layer of soil that is impenetrable
by roots. Also known as glacial till.
Harmful pollutant A substance that has adverse effects to an organism including immediate death,
impaired reproduction, cancer or other effects.
Head (hydraulics) The height of water above any plane of reference. The energy, either kinetic or
potential, possessed by each unit weight of a liquid, expressed as the vertical
height through which a unit weight would have to fall to release the average
energy possessed. Used in various compound terms such as pressure head,
velocity head, and head loss.
Head loss Energy loss due to friction, eddies, changes in velocity, or direction of flow.
Heavy metals Metals of high specific gravity, present in municipal and industrial wastes, that
pose long-term environmental hazards. Such metals include cadmium,
chromium, cobalt, copper, lead, mercury, nickel, and zinc.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
807
Term Definition
High-use site High-use sites are those that typically generate high concentrations of oil due to
high traffic turnover or the frequent transfer of oil. High-use sites include:
• An area of a commercial or industrial site subject to an
expected average daily traffic (ADT) count equal to or greater
than 100 vehicles per 1,000 square feet of gross building
area;
• An area of a commercial or industrial site subject to
petroleum storage and transfer in excess of 1,500 gallons
per year, not including routinely delivered heating oil;
• An area of a commercial or industrial site subject to parking,
storage or maintenance of 25 or more vehicles that are over
10 tons gross weight (trucks, buses, trains, heavy equipment,
etc.);
• A road intersection with a measured ADT count of 25,000
vehicles or more on the main roadway and 15,000 vehicles
or more on any intersecting roadway, excluding projects
proposing primarily pedestrian or bicycle use.
Highway A main public road connecting towns and cities.
Hog fuel See wood-based mulch.
Horton overland flow A runoff process whereby the rainfall rate exceeds the infiltration rate, so that
the precipitation that does not infiltrate flows downhill over the soil surface.
HSPF Hydrological Simulation Program-Fortran. A continuous simulation
hydrologic model that transforms an uninterrupted rainfall record into a
concurrent series of runoff or flow data by means of a set of mathematical
algorithms which represent the rainfall-runoff process at some conceptual level.
Humus Organic matter in or on a soil, composed of partly or fully decomposed bits of
plant tissue or from animal manure.
Hydraulic Conductivity The quality of saturated soil that enables water or air to move through it. Also
known as permeability coefficient.
Hydraulic gradient Slope of the potential head relative to a fixed datum.
Hydrodynamics The dynamic energy, force, or motion of fluids as affected by the physical forces
acting upon those fluids.
Hydrograph A graph of runoff rate, inflow rate or discharge rate, past a specific point over
time.
Hydrologic cycle The circuit of water movement from the atmosphere to the earth and return to
the atmosphere through various stages or processes as precipitation,
interception, runoff, infiltration, percolation, storage, evaporation, and
transpiration.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
808
Term Definition
Hydrologic Soil Groups A soil characteristic classification system defined by the U.S. Soil Conservation
Service in which a soil may be categorized into one of four soil groups (A, B, C,
or D) based upon infiltration rate and other properties.
Type A: Low runoff potential. Soils having high infiltration rates, even when
thoroughly wetted, and consisting chiefly of deep, well drained to excessively
drained sands or gravels. These soils have a high rate of water transmission.
Type B: Moderately low runoff potential. Soils having moderate infiltration rates
when thoroughly wetted, and consisting chiefly of moderately fine to moderately
coarse textures. These soils have a moderate rate of water transmission.
Type C: Moderately high runoff potential. Soils having slow infiltration rates
when thoroughly wetted, and consisting chiefly of soils with a layer that impedes
downward movement of water, or soils with moderately fine to fine textures.
These soils have a slow rate of water transmission.
Type D: High runoff potential. Soils having very slow infiltration rates when
thoroughly wetted, and consisting chiefly of clay soils with a high swelling
potential, soils with a permanent high water table, soils with a hardpan, till, or
clay layer at or near the surface, soils with a compacted subgrade at or near the
surface, and shallow soils or nearly impervious material. These soils have a
very slow rate of water transmission.1
1 Vladimir Novotny and Harvey Olem. Water Quality Prevention, Identification,
and Management of Diffuse Pollution, Van Nostrand Reinhold: New York, 1994,
p. 109.
Hydrology The science of the behavior of water in the atmosphere, on the surface of the
earth, and underground.
Hydroperiod A seasonal occurrence of flooding and/or soil saturation; it encompasses depth,
frequency, duration, and seasonal pattern of inundation.
Hyetograph A graph of percentages of total precipitation for a series of time steps
representing the total time in which precipitation occurs.
Illicit discharge All non-stormwater discharges to stormwater drainage systems that cause or
contribute to a violation of state water quality, sediment quality or groundwater
quality standards, including but not limited to sanitary sewer connections,
industrial process water, interior floor drains, car washing, and greywater
systems.
Impact basin A device used to dissipate the energy of flowing water. Generally constructed of
concrete in the form of a partially depressed or partially submerged vessel, it
may utilize baffles to dissipate velocities.
Impervious Not allowing penetration.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
809
Term Definition
Impervious surface A hard surface area which either prevents or retards the entry of water into the
soil mantle as under natural conditions prior to development. A hard surface
area which causes water to run off the surface in greater quantities or at an
increased rate of flow from the flow present under natural conditions prior to
development. Common impervious surfaces include, but are not limited to,
rooftops, walkways, patios, driveways, parking lots or storage areas, concrete or
asphalt paving, gravel roads, oil mat roads, packed earthen materials, and
oiled, macadam or other surfaces which similarly impede the natural infiltration
of stormwater. Open, uncovered retention/detention facilities shall not be
considered as impervious surfaces for the purposes of determining whether the
thresholds for application of minimum requirements are exceeded. Open,
uncovered retention/detention facilities shall be considered impervious surfaces
for purposes of runoff modeling.
Impoundment A natural or man-made containment for surface water.
Improvement Streets (with or without curbs or gutters), sidewalks, crosswalks, parking lots,
water mains, sanitary and storm sewers, drainage facilities, street trees and
other appropriate items.
Industrial activities Material handling, transportation, or storage; manufacturing; maintenance;
treatment; or disposal. Areas with industrial activities include plant yards, access
roads and rail lines used by carriers of raw materials, manufactured products,
waste material, or by-products; material handling sites; refuse sites; sites used
for the application or disposal of process waste waters; sites used for the
storage and maintenance of material handling equipment; sites used for
residual treatment, storage, or disposal; shipping and receiving areas;
manufacturing buildings; storage areas for raw materials, and intermediate and
finished products; and areas where industrial activity has taken place in the past
and significant materials remain and are exposed to stormwater.
Industrial sites Those sites required to obtain the National Pollutant Discharge Elimination
System (NPDES) Industrial Stormwater General Permit coverage in accordance
with 40 CFR 122.26. These sites include industrial areas that manufacture,
process, or store raw materials.
Infiltration Means the downward movement of water from the surface to the subsoil.
Infiltration facility
(or system)
A drainage facility designed to use the hydrologic process of surface and
stormwater runoff soaking into the ground, commonly referred to as a
percolation, to dispose of surface and stormwater runoff.
Infiltration rate The rate, usually expressed in inches/hour, at which water moves downward
(percolates) through the soil profile. Short-term infiltration rates may be inferred
from soil analysis or texture or derived from field measurements. Long-term
infiltration rates are affected by variability in soils and subsurface conditions at
the site, the effectiveness of pretreatment or influent control, and the degree of
long-term maintenance of the infiltration facility.
Ingress/egress The points of access to and from a property.
Inlet A form of connection between surface of the ground and a drain or sewer for the
admission of surface and stormwater runoff.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
810
Term Definition
Insecticide A substance, usually chemical, that is used to kill insects.
Interception (Hydraulics) The process by which precipitation is caught and held by foliage, twigs, and
branches of trees, shrubs, and other vegetation. Often used for "interception
loss" or the amount of water evaporated from the precipitation intercepted.
Interflow That portion of rainfall that infiltrates into the soil and moves laterally through the
upper soil horizons until intercepted by a stream channel or until it returns to the
surface for example, in a roadside ditch, wetland, spring or seep. Interflow is a
function of the soil system depth, permeability, and water-holding capacity.
Intermittent stream A stream or portion of a stream that flows only in direct response to
precipitation. It receives little or no water from springs and no long-continued
supply from melting snow or other sources. It is dry for a large part of the year,
ordinarily more than three months.
Invasive weedy plant
species
Opportunistic species of inferior biological value that tend to out-compete more
desirable forms and become dominant; applied to non-native species in this
manual.
Invert The lowest point on the inside of a sewer or other conduit.
Invert elevation The vertical elevation of a pipe or orifice in a pond that defines the water level.
Isopluvial map A map with lines representing constant depth of total precipitation for a given
return frequency.
Lag time The interval between the center of mass of the storm precipitation and the peak
flow of the resultant runoff.
Lake An area permanently inundated by water in excess of two meters deep and
greater than 20 acres in size as measured at the ordinary high water marks.
Land disturbing activity Any activity that results in a movement of earth or a change in the existing soil
cover (both vegetative and non-vegetative) and/or the existing soil topography.
Land disturbing activities include, but are not limited to clearing, grading, filling,
and excavation. Compaction that is associated with stabilization of structures
and road construction shall also be considered a land disturbing activity.
Vegetation maintenance practices are not considered land-disturbing activity.
Landslide Episodic downslope movement of a mass of soil or rock that includes but is not
limited to rockfalls, slumps, mudflows, and earthflows. For the purpose of these
rules, snow avalanches are considered to be a special case of landsliding.
Landslide hazard areas Those areas subject to a severe risk of landslide.
Leachable materials Those substances that, when exposed to rainfall, measurably alter the physical
or chemical characteristics of the rainfall runoff. Examples include erodible soils,
uncovered process wastes, manure, fertilizers, oil substances, ashes, kiln dust,
and garbage dumpster leakage.
Leachate Liquid that has percolated through soil and contains substances in solution or
suspension.
Leaching Removal of the more soluble materials from the soil by percolating waters.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
811
Term Definition
Legume A member of the legume or pulse family, Leguminosae, one of the most
important and widely distributed plant families. The fruit is a "legume" or pod.
Includes many valuable food and forage species, such as peas, beans, clovers,
alfalfas, sweet clovers, and vetches. Practically all legumes are nitrogen-fixing
plants.
Level pool routing The basic technique of storage routing used for sizing and analyzing detention
storage and determining water levels for ponding water bodies. The level pool
routing technique is based on the continuity equation: Inflow – Outflow =
Change in storage.
Level spreader A temporary ESC device used to spread out stormwater runoff uniformly over
the ground surface as sheet flow (i.e., not through channels). The purpose of
level spreaders is to prevent concentrated, erosive flows from occurring, and to
enhance infiltration.
LID See Low impact development.
Local government Any county, city, town, or special purpose district having its own incorporated
government for local affairs.
Low flow channel An incised or paved channel from inlet to outlet in a dry basin which is designed
to carry low runoff flows and/or baseflow, directly to the outlet without detention.
Low impact development A stormwater management strategy that emphasizes conservation and the use
of existing natural site features integrated with engineered, small-scale
stormwater controls to more closely mimic predevelopment hydrologic
conditions.
Low permeable liner A layer of compacted till or clay, or a geomembrane.
Lowest floor The lowest enclosed area (including basement) of a structure. An area used
solely for parking of vehicles, building access, or storage, in an area other than
a basement area, is not considered a building's lowest floor, provided that the
enclosed area meets all of the structural requirements of the flood hazard
standards.
MDNS A Mitigated Determination of Nonsignificance (See DNS and Mitigation).
Maintenance Repair and maintenance includes activities conducted on currently serviceable
structures, facilities, and equipment that involves no expansion or use beyond
that previously existing and resulting in no significant adverse hydrologic impact.
It includes those usual activities taken to prevent a decline, lapse, or cessation
in the use of structures and systems and includes replacement of dysfunctioning
facilities, including cases where environmental permits require replacing an
existing structure with a different type structure, as long as the functioning
characteristics of the original structure are not changed. For example, replacing
a collapsed, fish blocking, round culvert with a new box culvert under the same
span, or width, of roadway. For further details on the application of this manual
to various road management functions, please see Volume 1, Section 3.2.1.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
812
Term Definition
Manning's equation An equation used to predict the velocity of water flow in an open channel or
pipelines:
V = 1.486R2/3S1/2
n
where:
V is the mean velocity of flow in feet per second
R is the hydraulic radius in feet
S is the slope of the energy gradient or, for assumed uniform flow, the
slope of the channel in feet per foot; and
n is Manning's roughness coefficient or retardance factor of the channel
lining.
Mass wasting The movement of large volumes of earth material downslope.
Master drainage plan A comprehensive drainage control plan intended to prevent significant adverse
impacts to the natural and manmade drainage system, both on and off-site.
Mean annual water level
fluctuation
Derived as follows:
(1) Measure the maximum water level (e.g., with a crest stage gage,
Reinelt and Horner 1990) and the existing water level at the time of the
site visit (e.g., with a staff gage) on at least eight occasions spread
through a year.
(2) Take the difference of the maximum and existing water level on each
occasion and divide by the number of occasions.
Mean depth Average depth; cross-sectional area of a stream or channel divided by its
surface or top width.
Mean velocity The average velocity of a stream flowing in a channel or conduit at a given
cross-section or in a given reach. It is equal to the discharge divided by the
cross-sectional area of the reach.
Measuring weir A shaped notch through which water flows are measured. Common shapes are
rectangular, trapezoidal, and triangular.
Mechanical analysis The analytical procedure by which soil particles are separated to determine the
particle size distribution.
Mechanical practices Soil and water conservation practices that primarily change the surface of the
land or that store, convey, regulate, or dispose of runoff water without excessive
erosion.
Metals Elements, such as mercury, lead, nickel, zinc and cadmium, which are of
environmental concern because they do not degrade over time. Although many
are necessary nutrients, they are sometimes magnified in the food chain, and
they can be toxic to life in high enough concentrations. They are also referred to
as heavy metals.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
813
Term Definition
Microbes The lower trophic levels of the soil food web. They are normally considered to
include bacteria, fungi, flagellates, amoebae, ciliates, and nematodes. These in
turn support the higher trophic levels, such as mites and earthworms. Together
they are the basic life forms that are necessary for plant growth. Soil microbes
also function to bioremediate pollutants such as petroleum, nutrients, and
pathogens.
Mitigation To lessen known impacts to the environment. Mitigation should be conducted in
the following order of preference:
(1) Avoiding the impact altogether by not taking a certain action or part of an
action;
(2) Minimizing impacts by limiting the degree or magnitude of the action and
its implementation, by using appropriate technology, or by taking
affirmative steps to avoid or reduce impacts;
(3) Rectifying the impact by repairing, rehabilitating or restoring the affected
environment;
(4) Reducing or eliminating the impact over time by preservation and
maintenance operations during the life of the action; and
(5) Compensating for the impact by replacing, enhancing, or providing
substitute resources or environments.
Modification, modified
(wetland)
A wetland whose physical, hydrological, or water quality characteristics have
been purposefully altered for a management purpose, such as by dredging,
filling, forebay construction, and inlet or outlet control.
Monitor To systematically and repeatedly measure something in order to track changes.
Monitoring The collection of data by various methods for the purposes of understanding
natural systems and features, evaluating the impacts of development proposals
on such systems, and assessing the performance of mitigation measures
imposed as conditions of development.
Multifamily sites Sites defined as multifamily in ACC Title 18.
NGPE See Native Growth Protection Easement.
NGVD National Geodetic Vertical Datum.
NPDES The National Pollutant Discharge Elimination System as established by the
Federal Clean Water Act.
National Pollutant
Discharge Elimination
System (NPDES)
The part of the federal Clean Water Act, which requires point source
dischargers to obtain permits. These permits are referred to as NPDES permits
and, in Washington State, are administered by the Washington State
Department of Ecology
Native Growth Protection
Easement (NGPE)
An easement granted for the protection of native vegetation within a sensitive
area or its associated buffer. The NGPE shall be recorded on the appropriate
documents of title and filed with the County Records Division.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
814
Term Definition
Native vegetation Vegetation comprised of plant species, other than noxious weeds, that are
indigenous to the coastal region of the Pacific Northwest and which reasonably
could have been expected to naturally occur on the site. Examples include trees
such as Douglas fir, Western Hemlock, Western Red Cedar, Alder, Big-leaf
Maple, and Vine Maple; shrubs such as willow, elderberry, salmonberry and
salal; and herbaceous plants such as sword fern, foam flower, and fireweed.
Natural location Means the location of those channels, swales, and other non-manmade
conveyance systems as defined by the first documented topographic contours
existing for the subject property, either from maps or photographs, or such other
means as appropriate. In the case of outwash soils with relatively flat terrain, no
natural location of surface discharge may exist.
New development Land disturbing activities, including Class IV -general forest practices that are
conversions from timber land to other uses; structural development, including
construction or installation of a building or other structure; creation of impervious
surfaces; and subdivision, short subdivision and binding site plans, as defined
and applied in Chapter 58.17 RCW. Projects meeting the definition of
redevelopment shall not be considered new development.
Nitrate (NO3) A form of nitrogen which is an essential nutrient to plants. It can cause algal
blooms in water if all other nutrients are present in sufficient quantities. It is a
product of bacterial oxidation of other forms of nitrogen, from the atmosphere
during electrical storms and from fertilizer manufacturing.
Nitrification The biochemical oxidation process by which ammonia is changed first to nitrites
and then to nitrates by bacterial action, consuming oxygen in the water.
Nitrogen, Available Usually ammonium, nitrite, and nitrate ions, and certain simple amines available
for plant growth. A small fraction of organic or total nitrogen in the soil is
available at any time.
Nonpoint source
pollution
Pollution that enters a waterbody from diffuse origins on the watershed and
does not result from discernible, confined, or discrete conveyances.
Normal depth The depth of uniform flow. This is a unique depth of flow for any combination of
channel characteristics and flow conditions. Normal depth is calculated using
Manning's Equation.
NRCS Method See SCS Method.
Nutrients Essential chemicals needed by plants or animals for growth. Excessive amounts
of nutrients can lead to degradation of water quality and algal blooms. Some
nutrients can be toxic at high concentrations.
Off-line facilities Water quality treatment facilities to which stormwater runoff is restricted to some
maximum flow rate or volume by a flow-splitter.
Offsite drainage Any area lying upstream of the site that drains onto the site and any area lying
downstream of the site to which the site drains.
Off-system storage Facilities for holding or retaining excess flows over and above the carrying
capacity of the stormwater conveyance system, in chambers, tanks, lagoons,
ponds, or other basins that are not a part of the subsurface sewer system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
815
Term Definition
Oil/water separator A vault, usually underground, designed to provide a quiescent environment to
separate oil from water.
On-line facilities Water quality treatment facilities which receive all of the stormwater runoff from
a drainage area. Flows above the water quality design flow rate or volume are
passed through at a lower percent removal efficiency.
On-site drainage Drainage originating within the site.
On-site Stormwater
Management BMPs
Site development techniques that serve to infiltrate, disperse, and retain
stormwater runoff on-site.
Operational BMPs Operational BMPs are a type of Source Control BMP. They are schedules of
activities, prohibition of practices, and other managerial practices to prevent or
reduce pollutants from entering stormwater. Operational BMPs include
formation of a pollution prevention team, good housekeeping, preventive
maintenance procedures, spill prevention and clean-up, employee training,
inspections of pollutant sources and BMPs, and record keeping. They can also
include process changes, raw material/product changes, and recycling wastes.
Ordinary high water
mark
The term ordinary high water mark means the line on the shore established by
the fluctuations of water and indicated by physical characteristics such as a
clear, natural line impressed on the bank; shelving; changes in the character of
soil destruction on terrestrial vegetation, or the presence of litter and debris; or
other appropriate means that consider the characteristics of the surrounding
area.
The ordinary high water mark will be found by examining the bed and banks of a
stream and ascertaining where the presence and action of waters are so
common and usual, and so long maintained in all ordinary years, as to mark
upon the soil a character distinct from that of the abutting upland, in respect to
vegetation. In any area where the ordinary high water mark cannot be found,
the line of mean high water shall substitute. In any area where neither can be
found, the channel bank shall be substituted. In braided channels and alluvial
fans, the ordinary high water mark or substitute shall be measured so as to
include the entire stream feature.
Organic matter Organic matter as decomposed animal or vegetable matter. It is measured by
ASTM D 2974. Organic matter is an important reservoir of carbon and a
dynamic component of soil and the carbon cycle. It improves soil and plant
efficiency by improving soil physical properties including drainage, aeration, and
other structural characteristics. It contains the nutrients, microbes, and higher-
form soil food web organisms necessary for plant growth. The maturity of
organic matter is a measure of its beneficial properties. Raw organic matter can
release water-soluble nutrients (similar to chemical fertilizer). Beneficial organic
matter has undergone a humification process either naturally in the environment
or through a composting process.
Orifice An opening with closed perimeter, usually sharp-edged, and of regular form in a
plate, wall, or partition through which water may flow, generally used for the
purpose of measurement or control of water.
Outlet Point of water disposal from a stream, river, lake, tidewater, or artificial drain.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
816
Term Definition
Outlet channel A waterway constructed or altered primarily to carry water from man-made
structures, such as terraces, tile lines, and diversions.
Outwash soils Soils formed from highly permeable sands and gravels.
Overflow A device that allows the portion of flow above which can be handled to
discharge downstream.
Overflow rate Detention basin release rate divided by the surface area of the basin. It can be
thought of as an average flow rate through the basin.
Overtopping To flow over the limits of a containment or conveyance element.
Particle Size The effective diameter of a particle as measured by sedimentation, sieving, or
micrometric methods.
Peak discharge The maximum instantaneous rate of flow during a storm, usually in reference to
a specific design storm event.
Peak-shaving Controlling post-development peak discharge rates to pre-development levels
by providing temporary detention in a BMP.
Percolation The movement of water through soil.
Percolation rate The rate, often expressed in minutes/inch, at which clear water, maintained at a
relatively constant depth, will seep out of a standardized test hole that has been
previously saturated. The term percolation rate is often used synonymously with
infiltration rate (short-term infiltration rate).
Permanent Stormwater
Control (PSC) Plan
A plan which includes permanent BMPs for the control of pollution from
stormwater runoff after construction and/or land disturbing activity has been
completed.
Permeable soils Soil materials with a sufficiently rapid infiltration rate so as to greatly reduce or
eliminate surface and stormwater runoff. These soils are generally classified as
SCS hydrologic soil types A and B.
Person Any individual, partnership, corporation, association, organization, cooperative,
public or municipal corporation, agency of the state, or local government unit,
however designated.
Perviousness Related to the size and continuity of void spaces in soils; related to a soil's
infiltration rate.
Pesticide A general term used to describe any substance - usually chemical - used to
destroy or control organisms; includes herbicides, insecticides, algicides,
fungicides, and others. Many of these substances are manufactured and are not
naturally found in the environment. Others, such as pyrethrum, are natural
toxins that are extracted from plants and animals.
pH A measure of the alkalinity or acidity of a substance which is conducted by
measuring the concentration of hydrogen ions in the substance. A pH of 7.0
indicates neutral water. A 6.5 reading is slightly acid.
Physiographic Characteristics of the natural physical environment (including hills).
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
817
Term Definition
Plan Approval Authority The Plan Approval Authority is defined as that department within a local
government that has been delegated authority to approve stormwater site plans.
Planned unit
development (PUD)
A special classification authorized in some zoning ordinances, where a unit of
land under control of a single developer may be used for a variety of uses and
densities, subject to review and approval by the local governing body. The
locations of the zones are usually decided on a case-by-case basis.
Plat A map or representation of a subdivision showing the division of a tract or parcel
of land into lots, blocks, streets, or other divisions and dedications.
Plunge pool A device used to dissipate the energy of flowing water that may be constructed
or made by the action of flowing. These facilities may be protected by various
lining materials.
Point discharge The release of collected and/or concentrated surface and stormwater runoff
from a pipe, culvert, or channel.
Point of compliance The location at which compliance with a discharge performance standard or a
receiving water quality standard is measured.
Pollution Contamination or other alteration of the physical, chemical, or biological
properties, of waters of the state, including change in temperature, taste, color,
turbidity, or odor of the waters, or such discharge of any liquid, gaseous, solid,
radioactive or other substance into any waters of the state as will or is likely to
create a nuisance or render such waters harmful, detrimental or injurious to the
public health, safety or welfare, or to domestic, commercial, industrial,
agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild
animals, birds, fish or other aquatic life.
Pollution-generating
impervious surface
(PGIS)
Those impervious surfaces considered to be a significant source of pollutants in
stormwater runoff. Such surfaces include those which are subject to: vehicular
use; industrial activities (as further defined in this glossary); or storage of
erodible or leachable materials, wastes, or chemicals, and which receive direct
rainfall or the run-on or blow-in of rainfall. Erodible or leachable materials,
wastes, or chemicals are those substances which, when exposed to rainfall,
measurably alter the physical or chemical characteristics of the rainfall runoff.
Examples include erodible soils that are stockpiled, uncovered process wastes,
manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster
leakage. Metal roofs are also considered to be PGIS unless they are coated
with an inert, non-leachable material (e.g., baked-on enamel coating).
A surface, whether paved or not, shall be considered subject to vehicular use if
it is regularly used by motor vehicles. The following are considered regularly-
used surfaces: roads, non-vegetated road shoulders, bike lanes within the
traveled lane of a roadway, driveways, parking lots, unfenced fire lanes,
vehicular equipment storage yards, and airport runways.
The following are not considered regularly-used surfaces: paved bicycle
pathways separated from and not subject to drainage from roads for motor
vehicles, fenced fire lanes, and infrequently used maintenance access roads.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
818
Term Definition
Pollution-generating
pervious surface (PGPS)
Any non-impervious surface subject to use of pesticides and fertilizers or loss of
soil. Typical PGPS include lawns, landscaped areas, golf courses, parks,
cemeteries, and sports fields
Predeveloped Condition The native vegetation and soils that existed at a site prior to the influence of
Euro-American settlement. The pre-developed condition shall be assumed to be
forested land cover unless reasonable, historic information is provided that
indicates the site was prairie prior to settlement.
Prediction For the purposes of this document an expected outcome based on the results of
hydrologic modeling and/or the judgment of a trained professional civil engineer
or geologist.
Pretreatment The removal of material such as solids, grit, grease, and scum from flows prior
to physical, biological, or physical treatment processes to improve treatability.
Pretreatment may include screening, grit removal, settling, oil/water separation,
or application of a Basic Treatment BMP prior to infiltration.
Priority peat systems Unique, irreplaceable fens that can exhibit water pH in a wide range from highly
acidic to alkaline, including fens typified by Sphagnum species, Ledum
groenlandicum (Labrador tea), Drosera rotundifolia (sundew), and Vaccinium
oxycoccos (bog cranberry); marl fens; estuarine peat deposits; and other moss
peat systems with relatively diverse, undisturbed flora and fauna. Bog is the
common name for peat systems having the Sphagnum association described,
but this term applies strictly only to systems that receive water income from
precipitation exclusively.
Professional civil
engineer
A person registered with the state of Washington as a professional engineer in
civil engineering.
Project Any proposed action to alter or develop a site. The proposed action of a permit
application or an approval, which requires drainage review.
Project site That portion of a property, properties, or right of way subject to land disturbing
activities, new impervious surfaces, or replaced impervious surfaces. On-site
and associated off-site improvements shall be added together when determining
if a project site exceeds a threshold. The City shall make the final determination
of the project site.
Properly Functioning
Soil System (PFSS)
Equivalent to engineered soil/landscape system. This can also be a natural
system that has not been disturbed or modified.
Puget Sound basin Puget Sound south of Admiralty Inlet (including Hood Canal and Saratoga
Passage); the waters north to the Canadian border, including portions of the
Strait of Georgia; the Strait of Juan de Fuca south of the Canadian border; and
all the lands draining into these waters as mapped in Water Resources
Inventory Areas numbers 1 through 19, set forth in WAC 173-500-040.
R/D See retention/detention facility.
Rare, threatened, or
endangered species
Plant or animal species that are regional relatively uncommon, are nearing
endangered status, or whose existence is in immediate jeopardy and is usually
restricted to highly specific habitats. Threatened and endangered species are
officially listed by federal and state authorities, whereas rare species are
unofficial species of concern that fit the above definitions.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
819
Term Definition
Rational method A means of computing storm drainage flow rates (Q) by use of the formula Q =
CIA, where C is a coefficient describing the physical drainage area, I is the
rainfall intensity and A is the area.
Reach A length of channel with uniform characteristics.
Receiving waters Bodies of water or surface water systems to which surface runoff is discharged
via a point source of stormwater or via sheet flow.
Recharge The addition of water to the zone of saturation (i.e., an aquifer).
Recommended BMPs As used in Volume 4, recommended BMPs are those BMPs that are not
expected to be mandatory by local governments at new development and
redevelopment sites. However, they may improve pollutant control efficiency,
and may provide a more comprehensive and environmentally effective
stormwater management program.
Redevelopment On a site that is already substantially developed (i.e., has 35% or more of
existing impervious surface coverage), the creation or addition of impervious
surfaces; the expansion of a building footprint or addition or replacement of a
structure; structural development including construction, installation or
expansion of a building or other structure; replacement of impervious surface
that is not part of a routine maintenance activity; and land disturbing activities.
Regional An action (here, for stormwater management purposes) that involves more than
one discrete property.
Regional detention
facility
A stormwater quantity control structure designed to correct existing surface
water runoff problems of a basin or sub-basin. The area downstream has been
previously identified as having existing or predicted significant and regional
flooding and/or erosion problems.
This term is also used when a detention facility is sited to detain stormwater
runoff from a number of new developments or areas within a catchment.
Release rate The computed peak rate of surface and stormwater runoff from a site.
Removed impervious
surface
Areas where the impervious surface covering (i.e. building, pavement, gravel,
etc.) has been removed, the soil has been amended in accordance with the
BMP L613 (Volume 6, Section 2.2.1.4) and the area is left as a permanent
pervious surface (landscaping, natural areas) and planted with native vegetation
including evergreen trees. Removed impervious surfaces are not required to be
added to the impervious area totals to determine compliance with Minimum
Requirements #6 and #7.
Replaced impervious
surface
For structures, the removal and replacement of any exterior impervious surfaces
or foundation. For other impervious surfaces, the removal down to bare soil or
base course and replacement.
Residential density The number of dwelling units per unit of surface area. Net density includes only
occupied land. Gross density includes unoccupied portions of residential areas,
such as roads and open space.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
820
Term Definition
Restoration Actions performed to reestablish wetland functional characteristics and
processes that have been lost by alterations, activities, or catastrophic events in
an area that no longer meets the definition of a wetland
Retention The process of collecting and holding surface and stormwater runoff with no
surface outflow.
Retention/detention
facility (R/D)
A type of drainage facility designed either to hold water for a considerable length
of time and then release it by evaporation, plant transpiration, and/or infiltration
into the ground; or to hold surface and stormwater runoff for a short period of
time and then release it to the surface and stormwater management system.
Retrofitting The renovation of an existing structure or facility to meet changed conditions or
to improve performance.
Return frequency A statistical term for the average time of expected interval that an event of some
kind will equal or exceed given conditions (e.g., a stormwater flow that occurs
every 2 years)
Rhizome A modified plant stem that grows horizontally underground.
Riffles Fast sections of a stream where shallow water races over stones and gravel.
Riffles usually support a wider variety of bottom organisms than other stream
sections.
Rill A small intermittent watercourse with steep sides, usually only a few inches
deep. Often rills are caused by an increase in surface water flow when soil is
cleared of vegetation.
Riprap A facing layer or protective mound of rocks placed to prevent erosion or
sloughing of a structure or embankment due to flow of surface and stormwater
runoff.
Riparian Pertaining to the banks of streams, wetlands, lakes, or tidewater.
Riser A vertical pipe extending from the bottom of a pond BMP that is used to control
the discharge rate from a BMP for a specified design storm.
Road Related Project A project whose objective is the construction or maintenance of a road. Roads
built as a requirement for permit issuance are not included in this category.
Rodenticide A substance used to destroy rodents.
Runoff Water originating from rainfall and other precipitation that is found in drainage
facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands as well as
shallow groundwater. As applied in this manual, it also means the portion of
rainfall or other precipitation that becomes surface flow and interflow.
SCS Soil Conservation Service (now the Natural Resources Conservation Service),
U.S. Department of Agriculture
SCS Method A single-event hydrologic analysis technique for estimating runoff based on the
Curve Number method. The Curve Numbers are published by NRCS in Urban
Hydrology for Small Watersheds, 55 TR, June 1976. With the change in name
to the Natural Resource Conservation Service, the method may be referred to
as the NRCS Method.
SEPA See State Environmental Policy Act.
Salmonid A member of the fish family Salmonidae. Chinook, coho, chum, sockeye and
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
821
Term Definition
pink salmon; cutthroat, brook, brown, rainbow, and steelhead trout; Dolly
Varden, kokanee, and char are examples of salmonid species.
Sand filter A man-made depression or basin with a layer of sand that treats stormwater as
it percolates through the sand and is discharged via a central collector pipe
Saturation point In soils, the point at which a soil or an aquifer will no longer absorb any amount
of water without losing an equal amount.
Scour Erosion of channel banks due to excessive velocity of the flow of surface and
stormwater runoff.
Sediment Fragmented material that originates from weathering and erosion of rocks or
unconsolidated deposits, and is transported by, suspended in, or deposited by
water.
Sedimentation The depositing or formation of sediment.
Sensitive emergent
vegetation communities
Assemblages of erect, rooted, herbaceous vegetation, excluding mosses and
lichens, at least some of whose members have relatively narrow ranges of
environmental requirements, such as hydroperiod, nutrition, temperature, and
light. Examples include fen species such as sundew and, as well as a number
of species of Carex (sedges).
Sensitive life stages Stages during which organisms have limited mobility or alternatives in securing
the necessities of life, especially including reproduction, rearing, and migration
periods.
Sensitive scrub-shrub
vegetation communities
Assemblages of woody vegetation less than 6 meters in height, at least some of
whose members have relatively narrow ranges of environmental requirements,
such as hydroperiod, nutrition, temperature, and light. Examples include fen
species such as Labrador tea, bog laurel, and cranberry.
Settleable solids Those suspended solids in stormwater that separate by settling when the
stormwater is held in a quiescent condition for a specified time.
Sheet erosion The relatively uniform removal of soil from an area without the development of
conspicuous water channels.
Sheet flow Runoff that flows over the ground surface as a thin, even layer, not concentrated
in a channel.
Shoreline development The proposed project as regulated by the Shoreline Management Act. Usually
the construction over water or within a shoreline zone (generally 200 feet
landward of the water) of structures such as buildings, piers, bulkheads, and
breakwaters, including environmental alterations such as dredging and filling, or
any project which interferes with public navigational rights on the surface waters.
Short circuiting The passage of runoff through a BMP in less than the design treatment time.
Siltation The process by which a river, lake, or other waterbody becomes clogged with
sediment. Silt can clog gravel beds and prevent successful salmon spawning.
Site The legal boundaries of a parcel or parcels of land that is (are) subject to new
development or redevelopment. For road projects, the length of the project site
and the right-of-way boundaries define the site.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
822
Term Definition
Slope Degree of deviation of a surface from the horizontal; measured as a numerical
ratio, percent, or in degrees. Expressed as a ratio, the first number is the
horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A
2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle
from the horizontal plane, with a 90° slope being vertical (maximum) and 45°
being a 1:1 or 100 percent slope.
Sloughing The sliding of overlying material. It is the same effect as caving, but it usually
occurs when the bank or an underlying stratum is saturated or scoured.
Soil The unconsolidated mineral and organic material on the immediate surface of
the earth that serves as a natural medium for the growth of land plants. See also
topsoil, engineered soil/landscape system, and properly functioning soil system.
Soil group, hydrologic A classification of soils by the Soil Conservation Service into four runoff potential
groups. The groups range from A soils, which are very permeable and produce
little or no runoff, to D soils, which are not very permeable and produce much
more runoff.
Soil horizon A layer of soil, approximately parallel to the surface, which has distinct
characteristics produced by soil-forming factors.
Soil profile A vertical section of the soil from the surface through all horizons, including C
horizons.
Soil structure The relation of particles or groups of particles which impart to the whole soil a
characteristic manner of breaking; some types are crumb structure, block
structure, platy structure, and columnar structure.
Soil permeability The ease with which gases, liquids, or plant roots penetrate or pass through a
layer of soil.
Soil stabilization The use of measures such as rock lining, vegetation or other engineering
structures to prevent the movement of soil when loads are applied to the soil.
Soil Texture Class The relative proportion, by weight, of particle sizes, based on the USDA system,
of individual soil grains less than 2 mm equivalent diameter in a mass of soil.
The basic texture classes in the approximate order of increasing proportions of
fine particles include: sand, loamy sand, sandy loam, loam, silt loam, silt, clay
loam, sandy clay, silty clay, and clay.
Sorption The physical or chemical binding of pollutants to sediment or organic particles.
Source control BMP A structure or operation that is intended to prevent pollutants from coming into
contact with stormwater through physical separation of areas or careful
management of activities that are sources of pollutants. This manual separates
source control BMPs into two types. Structural source control BMPs are
physical, structural, or mechanical devices or facilities that are intended to
prevent pollutants from entering stormwater. Operational BMPs are non-
structural practices that prevent or reduce pollutants from entering stormwater.
See Volume 4 for details.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
823
Term Definition
Spill control device A Tee section or turn down elbow designed to retain a limited volume of
pollutant that floats on water, such as oil or antifreeze. Spill control devices are
passive and must be cleaned-out for the spilled pollutant to actually be
removed.
Spillway A passage such as a paved apron or channel for surplus water over or around a
dam or similar obstruction. An open or closed channel, or both, used to convey
excess water from a reservoir. It may contain gates, either manually or
automatically controlled, to regulate the discharge of excess water.
State Environmental
Policy Act (SEPA)
RCW 43.21C
The Washington State law intended to minimize environmental damage. SEPA
requires that state agencies and local governments consider environmental
factors when making decisions on activities, such as development proposals
over a certain size and comprehensive plans. As part of this process,
environmental documents are prepared and opportunities for public comment
are provided.
Steep slope Slopes of 40 percent gradient or steeper within a vertical elevation change of at
least ten feet. A slope is delineated by establishing its toe and top, and is
measured by averaging the inclination over at least ten feet of vertical relief. For
the purpose of this definition:
The toe of a slope is a distinct topographic break in slope that separates slopes
inclined at less than 40% from slopes 40% or steeper. Where no distinct break
exists, the toe of a steep slope is the lower-most limit of the area where the
ground surface drops ten feet or more vertically within a horizontal distance of
25 feet; AND
The top of a slope is a distinct topographic break in slope that separates slopes
inclined at less than 40% from slopes 40% or steeper. Where no distinct break
exists, the top of a steep slope is the upper-most limit of the area where the
ground surface drops ten feet or more vertically within a horizontal distance of
25 feet.
Storage routing A method to account for the attenuation of peak flows passing through a
detention facility or other storage feature.
Storm drains The enclosed conduits that transport surface and stormwater runoff toward
points of discharge (sometimes called storm sewers).
Storm drain system Refers to the system of gutters, pipes, streams, or ditches used to carry surface
and stormwater from surrounding lands to streams, lakes, or Puget Sound.
Storm frequency The time interval between major storms of predetermined intensity and volumes
of runoff for which storm sewers and other structures are designed and
constructed to handle hydraulically without surcharging and backflooding, e.g., a
2-year, 10-year or 100-year storm.
Storm sewer A sewer that carries stormwater and surface water, street wash and other wash
waters or drainage, but excludes sewage and industrial wastes. Also called a
storm drain.
Stormwater That portion of precipitation that does not naturally percolate into the ground or
evaporate, but flows via overland flow, interflow, pipes and other features of a
stormwater drainage system into a defined surface waterbody, or a constructed
infiltration facility.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
824
Term Definition
Stormwater drainage
system
Constructed and natural features which function together as a system to collect,
convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat or filter
stormwater.
Stormwater facility A constructed component of a stormwater drainage system, designed or
constructed to perform a particular function, or multiple functions. Stormwater
facilities include, but are not limited to, pipes, swales, ditches, culverts, street
gutters, detention ponds, retention ponds, constructed wetlands, infiltration
devices, catch basins, oil/water separators, and biofiltration swales.
Stormwater Management
Manual for Western
Washington (Stormwater
Manual)
The manual prepared by Ecology which contains BMPs to prevent, control or
treat pollution in stormwater and reduce other stormwater-related impacts to
waters of the State. The Stormwater Manual is intended to provide guidance on
measures necessary in western Washington to control the quantity and quality
of stormwater runoff from new development and redevelopment. This manual is
equivalent to the Ecology manual and must be used for projects located within
the City of Auburn.
Stormwater Program Either the Basic Stormwater Program or the Comprehensive Stormwater
Program (as appropriate to the context of the reference) called for under the
Puget Sound Water Quality Management Plan
Stormwater Site Plan The comprehensive report containing all of the technical information and
analysis necessary for regulatory agencies to evaluate a proposed new
development or redevelopment project for compliance with stormwater
requirements. Contents of the Stormwater Site Plan will vary with the type and
size of the project, and individual site characteristics. It includes a Construction
Stormwater Pollution Prevention Plan (Construction SWPPP) and a Permanent
Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site
Plan is contained in Volume 1, Chapter 4.
Stream gauging The quantitative determination of stream flow using gages, current meters,
weirs, or other measuring instruments at selected locations. See
Gauging station.
Streambanks The usual boundaries, not the flood boundaries, of a stream channel. Right and
left banks are named facing downstream.
Streams Those areas where surface waters flow sufficiently to produce a defined
channel or bed. Lands and waters contained within a channel which supports
hydrophytes and where the substrate is predominantly undrained hydric soils,
nonsoil and/or is saturated with water or covered by water each growing
season. The channel or bed need not contain water year-round. This definition
is not meant to include irrigation ditches, canals, stormwater runoff devices or
other entirely artificial watercourses unless they are used to convey streams
naturally occurring prior to construction. Those topographic features that
resemble streams but have no defined channels (i.e. swales) shall be
considered streams when hydrologic and hydraulic analyses done pursuant to a
development proposal predict formation of a defined channel after development.
Structure A catch basin or manhole in reference to a storm drainage system.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
825
Term Definition
Structural source control
BMPs
Physical, structural, or mechanical devices or facilities that are intended to
prevent pollutants from entering stormwater. Structural source control BMPs
typically include:
• Enclosing and/or covering the pollutant source (building or other
enclosure, a roof over storage and working areas, temporary tarp,
etc.).
• Segregating the pollutant source to prevent run-on of stormwater,
and to direct only contaminated stormwater to appropriate treatment
BMPs.
Stub-out A short length of pipe provided for future connection to a storm drainage
system.
Subbasin A drainage area that drains to a water-course or waterbody named and noted
on common maps and which is contained within a basin.
Subcatchment A subdivision of a drainage basin (generally determined by topography and pipe
network configuration).
Subdrain A pervious backfilled trench containing stone or a pipe for intercepting
groundwater or seepage.
Subgrade A layer of stone or soil used as the underlying base for a BMP.
Subsoil The B horizons of soils with distinct profiles. In soils with weak profile
development, the subsoil can be defined as the soil below the plowed soil (or its
equivalent of surface soil), in which roots normally grow. Although a common
term, it cannot be defined accurately. It has been carried over from early days
when "soil" was conceived only as the plowed soil and that under it as the
"subsoil."
Substrate The natural soil base underlying a BMP.
Surcharge The flow condition occurring in closed conduits when the hydraulic grade line is
above the crown of the sewer.
Surface and stormwater Water originating from rainfall and other precipitation that is found in drainage
facilities, rivers, streams, springs, seeps, ponds, lakes, and wetlands as well as
shallow groundwater.
Surface and stormwater
management system
Drainage facilities and any other natural features that collect, store, control, treat
and/or convey surface and stormwater.
Suspended solids Organic or inorganic particles that are suspended in and carried by the water.
The term includes sand, mud, and clay particles (and associated pollutants) as
well as solids in stormwater.
Swale A shallow drainage conveyance with relatively gentle side slopes, generally with
flow depths less than one foot.
Terrace An embankment or combination of an embankment and channel across a slope
to control erosion by diverting or storing surface runoff instead of permitting it to
flow uninterrupted down the slope.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
826
Term Definition
Threshold Discharge
Area
An onsite area draining to a single natural discharge location or multiple natural
discharge locations that converge within one-quarter mile downstream (as
determined by the shortest flowpath). The examples in
Figure 1 illustrate this definition.
Figure 1. Threshold Discharge Area
The purpose of this definition is to clarify how the thresholds of this manual are
applied to project sites with multiple discharge points.
Tightline A continuous length of pipe that conveys water from one point to another
(typically down a steep slope) with no inlets or collection points in between.
Tile, Drain Pipe made of burned clay, concrete, or similar material, in short lengths, usually
laid with open joints to collect and carry excess water from the soil.
Tile drainage Land drainage by means of a series of tile lines laid at a specified depth and
grade.
Till A layer of poorly sorted soil deposited by glacial action that generally has very
low infiltration rates.
Time of concentration The time period necessary for surface runoff to reach the outlet of a subbasin
from the hydraulically most remote point in the tributary drainage area.
Topography General term to include characteristics of the ground surface such as plains,
hills, mountains, degree of relief, steepness of slopes, and other physiographic
features.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
827
Term Definition
Topsoil Topsoil shall be per ASTM D5268 standard specification, and water
permeability shall be 0.6 inches per hour or greater. Organic matter shall have
not more than 10 percent of nutrients in mineralized water-soluble forms.
Topsoil shall not have phytotoxic characteristics.
Total dissolved solids The dissolved salt loading in surface and subsurface waters.
Total Petroleum
Hydrocarbons (TPH)
A large family of chemical compounds that come from crude oil. Two types
important to stormwater include:
• TPH-Gx: The qualitative and quantitative method (extended) for volatile
(“gasoline”) petroleum products in water; and
• TPH-Dx: The qualitative and quantitative method (extended) for semi-
volatile (“diesel”) petroleum products in water.
Total solids The solids in water, sewage, or other liquids, including the dissolved, filterable,
and nonfilterable solids. The residue left when the moisture is evaporated and
the remainder is dried at a specified temperature, usually 130°C.
Total suspended solids That portion of the solids carried by stormwater that can be captured on a
standard glass filter.
Total Maximum Daily
Load (TMDL) – Water
Cleanup Plan
A calculation of the maximum amount of a pollutant that a waterbody can
receive and still meet water quality standards, and an allocation of that amount
to the pollutant’s sources. A TMDL (also known as a Water Cleanup Plan) is the
sum of the allowable loads of a single pollutant from all contributing point and
nonpoint sources. The calculation must include a margin of safety to ensure that
the waterbody can be used for the purposes the State has designated. The
calculation must also account for seasonable variation in water quality. Water
quality standards are set by states, territories, and tribes. They identify the uses
for each waterbody, for example, drinking water supply, contact recreation
(swimming), and aquatic like support (fishing), and the scientific criteria to
support that use. The Clean Water Act, Section 303, establishes the water
quality standards and TMDL programs.
Toxic Poisonous, carcinogenic, or otherwise directly harmful to life.
Tract A legally created parcel of property designated for special nonresidential and
noncommercial uses.
Trash rack A structural device used to prevent debris from entering a spillway or other
hydraulic structure.
Travel time The estimated time for surface water to flow between two points of interest.
Treatment BMP A BMP that is intended to remove pollutants from stormwater. A few examples
of treatment BMPs are detention ponds, oil/water separators, biofiltration
swales, and constructed wetlands.
Treatment liner A layer of soil that is designed to slow the rate of infiltration and provide
sufficient pollutant removal so as to protect groundwater quality.
Treatment train A combination of two or more treatment facilities connected in series.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
828
Term Definition
Trunk main Public stormwater drainage pipes equal to or greater than 36 inches and
installed at a minimum slope of 0.5% Some 36-inch mains may be installed at
less than the minimum slope. These shall not be considered trunk mains.
Turbidity Dispersion or scattering of light in a liquid, caused by suspended solids and
other factors; commonly used as a measure of suspended solids in a liquid.
Underdrain Plastic pipes with holes drilled through the top, installed on the bottom of an
infiltration BMP, which are used to collect and remove excess runoff.
Undisturbed buffer A zone where development activity shall not occur, including logging, and/or the
construction of utility trenches, roads, and/or surface and stormwater facilities.
Undisturbed low gradient
uplands
Forested land, sufficiently large and flat to infiltrate surface and storm runoff
without allowing the concentration of water on the surface of the ground.
Unstable slopes Those sloping areas of land which have in the past exhibited, are currently
exhibiting, or will likely in the future exhibit, mass movement of earth.
Unusual biological
community types
Assemblages of interacting organisms that are relatively uncommon regionally.
Urbanized area Areas designated and identified by the U.S. Bureau of Census according to the
following criteria: an incorporated place and densely settled surrounding area
that together have a maximum population of 50,000.
U.S. EPA The United States Environmental Protection Agency.
Values Wetland processes or attributes that are valuable or beneficial to society (also
see Functions). Wetland values include support of commercial and sport fish
and wildlife species, protection of life and property from flooding, recreation,
education, and aesthetic enhancement of human communities.
Variance See Exception.
Vegetated flowpath A route with established vegetation measured from the downspout or dispersion
system discharge point to the downstream property line, stream, wetland or
other impervious surface. For flow credits, this path must contain undisturbed
native landscape or lawn landscape meeting BMP L613: Post Construction Soil
Quality and Depth.
Vegetation All organic plant life growing on the surface of the earth.
Waterbody Surface waters including rivers, streams, lakes, marine waters, estuaries, and
wetlands.
Water Cleanup Plan See Total Maximum Daily Load.
Water quality A term used to describe the chemical, physical, and biological characteristics off
water, usually in respect to its suitability for a particular purpose.
Water quality design
storm
The 24-hour rainfall amount with a 6-month return frequency. Commonly
referred to as the 6-month, 24-hour storm.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
Glossary
829
Term Definition
Water quality standards Minimum requirements of purity of water for various uses; for example, water for
agricultural use in irrigation systems should not exceed specific levels of sodium
bicarbonate, pH, total dissolved salts, etc. In Washington, the Department of
Ecology sets water quality standards.
Watershed A geographic region within which water drains into a particular river, stream, or
body of water. Watersheds can be as large as those identified and numbered by
the State of Washington Water Resource Inventory Areas (WRIAs) as defined in
Chapter 173-500 WAC.
Water table The upper surface or top of the saturated portion of the soil or bedrock layer,
indicates the uppermost extent of groundwater.
Weir Device for measuring or regulating the flow of water.
Weir notch The opening in a weir for the passage of water.
Wetlands Those areas that are inundated or saturated by surface or groundwater at a
frequency and duration sufficient to support, and that under normal
circumstances do support, a prevalence of vegetation typically adapted for life in
saturated soil conditions. Wetlands generally include swamps, marshes, bogs,
and similar areas. Wetlands do not include those artificial wetlands intentionally
created from nonwetland sites, including, but not limited to, irrigation and
drainage ditches, grass-lined swales, canals, detention facilities, wastewater
treatment facilities, farm ponds, and landscape amenities, or those wetlands
created after July 1, 1990, that were unintentionally created as a result of the
construction of a road, street, or highway. Wetlands may include those artificial
wetlands intentionally created from nonwetland areas to mitigate the conversion
of wetlands. (Waterbodies not included in the definition of wetlands as well as
those mentioned in the definition are still waters of the state.)
Wetland edge Delineation of the wetland edge shall be based on the U.S. Army Corps of
Engineers Wetlands Delineation Manual, Technical Report Y-87-1, U.S. Army
Engineers Waterways Experiment Station, Vicksburg, Miss. (1987)
Wetponds and wetvaults Drainage facilities for water quality treatment that contain permanent pools of
water that are filled during the initial runoff from a storm event. They are
designed to optimize water quality by providing retention time in order to settle
out particles of fine sediment to which pollutants such as heavy metals absorb,
and to allow biologic activity to occur that metabolizes nutrients and organic
pollutants
Zoning ordinance An ordinance based on the police power of government to protect the public
health, safety, and general welfare. It may regulate the type of use and intensity
of development of land and structures to the extent necessary for a public
purpose. Requirements may vary among various geographically defined areas
called zones. Regulations generally cover such items as height and bulk of
buildings, density of dwelling units, off-street parking, control of signs, and use
of land for residential, commercial, industrial, or agricultural purposes. A zoning
ordinance is one of the major methods for implementation of a comprehensive
plan.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
References
830
References
General References
Azous, A.L. and Horner R.R., “Wetlands and Urbanization, Implications for the Future,” Final Report
of the Puget Sound Wetlands and Stormwater Management Research Program, 1997.
Booth, Derek B. and Jackson, C. Rhett, “Urbanization of Aquatic Systems: Degradation Thresholds,
Stormwater Detection, and the Limits of Mitigation,” Journal of the American Water Resources
Association, October 1997
Herrera, 1993 Cost Analysis – Washington Department of Ecology Minimum Requirements for
Stormwater Management, Herrera Environmental Consultants/Ecology, 1993
Hydrosphere Data Products, Inc., CD-ROM Hydrodata, USGS Daily and Peak Values
Issaquah Creek Basin and Nonpoint Action Plan, King County Surface Water Management Division,
Dec. 1996.
Karr, J.R., “Biological Integrity: A Long-Neglected Aspect of Water Resources Management,”
Ecological Applications 1(1):66-84, 1991.
Kleindl, W., A Benthic Index of Biotic Integrity for Puget Sound Lowland Streams, Masters Thesis,
University of Washington, Seattle, Washington. 68 pp., 1995
Langbein, W.B., “Annual Floods and the Partial-Duration Flood Series,” Transactions American
Geophysical Union, Vol. 30, pp. 879-881, 1949.
Lucchetti, G. and Fuerstenberg, R., “Relative Fish Use in Urban and Non-Urban Streams,”
Proceedings of the Conference on Wild Salmon, Vancouver, B.C., 1993.
May Christopher, et al, “Effects of Urbanization on Small Streams in the Puget Sound Lowland
Ecoregion,” Watershed Protection Techniques, Vol. 2, No. 4, June 1997.
Miller, J.F., Frederick, R.H. and Tracey, R.S., NOAA ATLAS 2, Precipitation - Frequency Atlas of the
Western United States, Volume IX - Washington, U.S. Dept. of Commerce, NOAA, National
Weather Service, Washington, D.C., 1973.
Perrich, Jerry R., The ESE National Precipitation Databook, Cahners Publishing Co., 1992.
Puget Sound Water Quality Management Plan, Puget Sound Water Quality Authority, 1987, 1989,
1991, 1994
Schaefer, M.G., “Regional Analyses of Precipitation Annual Maxima in Washington State,” Water
Resources Research, Vol. 26, No. 1 pp. 119-132, January 1990.
Schaefer, M.G., Technical Note 3: Design Storm Construction, Dam Safety Guidelines, Washington
State Department of Ecology, publication 92-55G, April 1993.
Strecker, Eric W., et al, Analysis of Oregon Urban Runoff Water Quality Monitoring Data Collected
From 1990 to 1996, The Oregon Association of Clean Water Agencies, 1997.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
References
831
Tri-County Road Maintenance ESA Technical Working Group, under the Tri-County ESA Response
Effort (King, Pierce, Snohomish and other municipalities and entities in Washington State),
Regional Road Maintenance Endangered Species Act – Program Guidelines, under final review
2002.
References for Western Washington Hydrology Model
Beyerlein, D.C. 1996. Effective Impervious Area: The Real Enemy. Presented at the Impervious
Surface Reduction Research Symposium, The Evergreen State College. Olympia, WA.
Bicknell, B.R., J.C. Imhoff, J.L. Kittle Jr, A.S. Donigian Jr, and R.C. Johanson. 1997. Hydrological
Simulation Program – Fortran User’s Manual for Version 11. EPA/600/R-97/080. National
Exposure Research Laboratory. Office of Research and Development. U.S. Environmental
Protection Agency. Research Triangle Park, NC.
Dinicola, R.S. 1990. Characterization and Simulation of Rainfall-Runoff Relations for Headwater
Basins in Western King and Snohomish Counties, Washington. Water-Resources Investigations
Report 89-4052. U.S. Geological Survey. Tacoma, WA.
King County. 1998. Surface Water Design Manual. Department of Natural Resources. Seattle, WA.
United States Water Resources Council. 1981. Guidelines for Determining Flood Flow Frequency.
Bulletin #17B of the Hydrology Committee. Washington, DC.
Resource Materials – Management of Street Wastes
Austin, City of, Removal Efficiencies of Stormwater Control Structures. Environmental and
Conservation Services Department, 1990.
City of Portland Vactor Waste Decant Data, Personal Communication with Katie Bretsch, April 2000.
Campbell, Robert, Street Waste Characterization Testing Program, VTP-1, Snohomish County
Public Works Maintenance & Operations Division, March 1994.
Collins, Jay, Oregon Department of Transportation, Street Waste Issues and Options FHWA-OR-
RD-99-05, July 1998.
Ecology, Interim TPH Policy, Publication N. ECY 97-600, 1997.
Ecology, Analytical Methods for Petroleum Hydrocarbons, Publication No. ECY 97-602, June 1997.
Ecology, Dangerous Waste Regulations, Chapter 173-303 WAC.
Ecology, Discussion Draft - Recommendations for Management of Street Waste, June 1999.
Ecology, Guidance for Remediation of Petroleum Contaminated Soils, pub 91-30, 1994.
Ecology, Model Toxics Control Act (MTCA) Cleanup Regulations, Chapter 173-340 WAC.
Ecology, Solid Waste Handling Standards, Chapter 173-350 WAC.
Ecology, Water Quality Standards For Surface Waters of the State of Washington, Chapter
173-201A.
Hazardous Waste Management Act of 1976, Chapter 70.105 RCW.
Herrera Environmental Consultants, Inc., King County Maintenance Waste Disposal Characterization
Study, prepared for King County Surface Water Management Division, January Draft, 1995.
SURFACE WATER MANAGEMENT MANUAL
NOVEMBER 2009
References
832
Herrera Environmental Consultants, Inc., Street Truck Operations and Disposal Practices, 1991.
Holz, Thomas, Street Waste Disposal, Thurston County, Washington: Final Engineering Report and
One Year Certification, Grant No. Tzx 91-129, May, 1994.
Jacobson, Michael, Data Summary of Catch Basin and Vactor Waste Contamination in Washington
State, Final Report, Center for Urban Water Resources, University of Washington, 1993.
King County, Vactor Waste Disposal Plan, King County Surface Water Management Division, Water
Quality Unit, 1994.
King County’s Renton Facility Decant Data, Personal Correspondence with Jerry Creek, and Susan
Turner, June 1999.
Landau Associates, Inc. Snohomish County Street Waste Characterization, Final Report, December
1995.
Pitt, R. and P. Bissonnette, Bellevue Urban Runoff Program; Summary Report, Prepared for City of
Bellevue Storm and Surface Water Utility,1984.
Pitt, R., 1985, Characterizing and Controlling Urban Runoff through Street and Sewer Cleaning,
EPA/600/2-85/038.
Pond, Rodney, South Base Pond Report - The Response of Wetland Plants to Stormwater Runoff
From a Transit Base, Municipality of Metropolitan Seattle Publication 775, 1993.
Schueler, Thomas R., Pollutant Dynamics of Pond Muck, Wat. Prot. Techniques, 1 (2). Summer
1994.
Serdar, Dave, Ecology, Contaminants in Vactor Truck Wastes, April 1993.
Thurston County Environmental Health Division, (Environmental Health Division-Unpublished
data), 1993
Thurston County Environmental Health Division, Report on Street Facility Monitoring Grant Tax No.
91-129, April 1993.
TYMCO, Inc., Best Management Practices - Street Sweeping, Waco, Texas, 1993.
US Environmental Protection Agency, Test Methods for Evaluating Solid Wastes, (SW-846), 3rd
Edition, 1986.
W&H Pacific, Inc., Street and Street Sweeping Waste Characteristics Snohomish County,
Washington, February 1994.
Resource Materials –
Association of General Contractors of Washington, Field Manual for Sediment/Erosion Control Best
Management Practices. 2002.
Center for Watershed Protection, Ellicott City, Maryland. 2005.
King County. Surface Water Design Manual. 2005.
Pierce County. Stormwater Pollution Prevention Manual. 2005.
Washington State Department of Ecology, Stormwater Management Manual for Western
Washington, 2005.