HomeMy WebLinkAboutCP1320 Final Geotech Report (March 2014)Geotechnical Subgrade Evaluation
Auburn M &O Facility Stormwater Improvements
1905 C Street SW, Auburn, Washington
March 19, 2014
Terracon Project No. 62135014
Prepared for:
City of Auburn Public Works Department
Auburn, Washington
Prepared by:
Terracon Consultants, Inc.
Tacoma, Washington
IIEMI 1 1 U�
March 19, 2014
City of Auburn Public Works Department
25 W. Main St.
Auburn, WA 98001
Attn: Mr. Seth Wickstrom
Re: Geotechnical Subgrade Evaluation
Auburn M&O Facility Stormwater Improvements
1305 C Street SW
Auburn, Washington
Terracon Project Number: B2135014
Dear Mr. Wickstrom:
Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for
the above referenced project. These services were performed in general accordance with the
Scope and Fee Proposal, P81130336, dated November 22, 2013 This report presents the
findings of the subsurface exploration and provides geotechnical recommendations concerning
infiltration, structural fill, compaction and temporary and permanent slopes.
We appreciate the opportunity to be of service to YOU on this project. If you have any questions
concerning this report, or if we may be of further service, please contact us.
Sincerely,
Terracon Consultants, Inc.
Paul D. Davis, P.E.
Office Manager
cc: 1 — Client (via e-mail)
�01'11
David A. Baska, Ph, D., P.E.
Principal
Terracon Consultants, Inc. 3006 S. 96th Street Lakewood, WA 98499
P [2531573-9939 F [253] 573-9959 terracon.com
TABLE OF CONTENTS
APPENDIX A — FIELD EXPLORATION
Exhibit A -1 Vicinity Map
Exhibit A -2 Site and Exploration Plan
Exhibit A -3 Field Exploration Description
Test Pit Logs A -4 through A -9
APPENDIX B — LABORATORY TESTING
Laboratory Testing
Sieve Analyses Exhibits B -1 through B -7
APPENDIX C — SUPPORTING DOCUMENTS
Exhibit C -1 General Notes
Exhibit C -2 Unified Soil Classification System
APPENDIX D — MOUNDING ANALYSIS
" ?' .III ofRIII vc, uJJ: 111111111 III" :,.wwmu III « 6 :! ^IR!!!II 111111111 III!' Ilii,,If`µlll�u
Page
EXECUTIVE SUMMARY ..............................................................................
............................... i
1.0
INTRODUCTION ..............................................................................
..............................1
2.0
PROJECT INFORMATION ...............................................................
..............................1
2.1 Project Description ...............................................................
............................... 1
2.2 Site Location and Description ...............................................
............................... 2
3.0
SUBSURFACE CONDITIONS ..........................................................
..............................2
3.1 Published Geologic Conditions ..............................................
..............................2
3.2 Subsurface Conditions ..........................................................
............................... 2
3.3 Groundwater ..........................................................................
..............................2
4.0
RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION
........ ..............................3
4.1 Infiltration Rates .....................................................................
..............................3
4.2 Groundwater Considerations ................................................
............................... 3
4.3 Construction Considerations .................................................
............................... 3
4.4 Structural Fill Requirements ..................................................
..............................4
4.5 Compaction Requirements ...................................................
............................... 5
4.6 Temporary /Permanent Slopes ..............................................
............................... 5
5.0
GENERAL COMMENTS ...................................................................
..............................6
APPENDIX A — FIELD EXPLORATION
Exhibit A -1 Vicinity Map
Exhibit A -2 Site and Exploration Plan
Exhibit A -3 Field Exploration Description
Test Pit Logs A -4 through A -9
APPENDIX B — LABORATORY TESTING
Laboratory Testing
Sieve Analyses Exhibits B -1 through B -7
APPENDIX C — SUPPORTING DOCUMENTS
Exhibit C -1 General Notes
Exhibit C -2 Unified Soil Classification System
APPENDIX D — MOUNDING ANALYSIS
" ?' .III ofRIII vc, uJJ: 111111111 III" :,.wwmu III « 6 :! ^IR!!!II 111111111 III!' Ilii,,If`µlll�u
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
EXECUTIVE SUMMARY
A Geotechnical Subgrade Evaluation has been performed for the Auburn M &O Facility located at
1305 C Street SW in Auburn, Washington. Terracon's geotechnical scope of work included the
advancement of 6 test pits to depths ranging from approximately 3 to 8 feet below existing site
grades and performing 5 infiltration tests.
Based on the information obtained from our subsurface exploration, the following geotechnical
considerations were identified:
Soils encountered generally consisted of silt, sandy silt, gravelly silt, organic silt, sand
and silty sand.
Unfactored infiltration rates were on the order of 0.5 to 5.3 inches per hour.
The results of our mounding analysis indicate that the trenches and ponds will have
standing water during a peak modeling event with a recovery time of about 30 hours
(from beginning of event).
This geotechnical executive summary should be used in conjunction with the entire report for
design and /or construction purposes. It should be recognized that specific details were not
included or fully developed in this summary, and the report must be read in its entirety for a
comprehensive understanding of the items contained herein. The section titled General
Comments should be read for an understanding of the report limitations.
I "µ .;7°Ill µw w III m u J 111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u
GEOTECHNICAL SUBGRADE EVALUATION
AUBURN M &O FACILITY STORMWATER IMPROVEMENTS
1305 C STREET SW
AUBURN, WASHINGTON
Terracon Project No. 82135014
March 19, 2014
1.0 INTRODUCTION
A geotechnical subgrade evaluation has been completed for the Auburn M &O Facility located at
1305 C Street SW in Auburn, Washington. The purpose of our evaluation is to provide
geotechnical recommendations and considerations for the following:
Stormwater infiltration rates Temporary/permanent slopes
Mounding analysis
Structural fill requirements
Compaction requirements
Our geotechnical engineering scope of work for this project included the advancement of 6 test
pits to depths of approximately 3 to 8 feet below existing site grades and performing 5 small
scale infiltration tests. The project will include a future structure and site infrastructure, which
was not a part of this current study. However, soil use, placement and slope recommendations
are included, as requested.
2.0 PROJECT INFORMATION
2.1 Project Description
ITEM DESCRIPTION
Site layout See Appendix A, Exhibit A -2: Site and Exploration Plan
Structures Single story decant building and infiltration ponds and trenches.
Grading Cuts and fills of 1 to 2 feet (assumed). Infiltration depths are on the order of 4
to 6 feet below existing site grades.
I "µ .;"Iµw w III m u J 111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
2.2 Site Location and Description
ITEM DESCRIPTION
Location See Appendix A, Exhibit A -1
Existing Site Features Multiple facility buildings and vehicle and equipment storage.
Current ground cover Grass, gravel and asphalt drive and parking areas.
Existing topography Relatively flat
3.0 SUBSURFACE CONDITIONS
3.1 Published Geologic Conditions
According to the Geologic Map of the Auburn Quadrangle, King and Pierce Counties,
Washington, prepared by D.R. Mullineaux, dated 1965, the site is classified as Qaw. It
describes the site as mostly gravel and sand deposited by White River. Bouldery cobble and
pebble - cobble gravel and sand in White River valley. Pebble- cobble gravel overlaiain by thin
sand in Duwamish Valley at mouth of White River valley, grades outward to thick coarse and
medium sand overlain by thin silt, clay, and peat.
3.2 Subsurface Conditions
Based on the results of the explorations, subsurface conditions on the project site consisted of silt,
sandy silt, gravelly silt, organic silt, sand and silty sand.
Conditions encountered at each exploration location are indicated on the individual test pit logs
found in Appendix A of this report. Conditions encountered in the explorations were generally
consistent with the thin silt, clay, and peat materials identified as the near - surface soil layers on the
published geologic map. Stratification boundaries on the logs represent the approximate location
of changes in soil types; in -situ, the transition between materials may be gradual.
3.3 Groundwater
Groundwater was not encountered in the test pits at the time of the excavations, with the
exception of TP -3, which encountered water at a depth of approximately 5'/2 feet below the
existing site grade. Please note that groundwater level fluctuations occur due to seasonal
variations in the amount of rainfall, runoff and other factors not evident at the time the
explorations were completed. The possibility of groundwater level fluctuations should be
considered when developing the design and construction plans for the project and is discussed
further in this report.
111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u 2
Geotechnical Subgrade Evaluation
Auburn M &O Facility Auburn, Washington
March 19, 2014 11111111, Terracon Project No. B2135014
4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION
4.1 Infiltration Rates
The City of Auburn Surface Water Management Manual, Volume IV, November 2009, was used
as a guide for performing the infiltration testing. As described in Section 5.4.2.1, Method 3 type
testing was performed. In this case, the in -situ testing consisted of constant and falling head
infiltration tests. Pilot Infiltration Tests (PIT) were not performed, but will likely be performed as
a part of a future study.
The following table presents unfactored infiltration rates determined during our field
investigation.
Location
Test Depth (feet)/
Test Elevation (feet)
Infiltration Rate (in /hour)
TP -1
2.5/84
0.5
TP -2A
3/82.5
5.3
TP -3
3.5/80.5
1.7
TP -4
4/80.5
1.3
TP -5
3/82.5
2.9
4.2 Groundwater Considerations
The estimated infiltration depth is indicated to be at an elevation of approximately 78 feet, based
on information provided by the project Civil Engineer. We assume that this elevation is based
on the same datum utilized to prepare the City of Auburn Topographic Survey, prepared by
Parametrix, dated November 18, 2013. Based on an April, 2013 on -site monitoring well
reading, groundwater was at about 76 feet. This information, along with other input data was
used to perform a mounding analysis. MODRET software, by Scientific Software Group, was
used to characterize mounding at this site. The results indicate that the trenches and ponds will
have standing water during a peak modeling event with a recovery time of about 30 hours (from
beginning of event). More detailed information on this analysis is presented in Appendix D.
4.3 Construction Considerations
It is our understanding that a future study will include structure and infrastructure
recommendations. In addition, Pilot Infiltration Tests (PIT) will be performed to better quantify
the receptor soil infiltration rates /capacities. Variations in subsurface conditions can affect the
infiltration rate of the receptor soils. We recommend that Terracon be provided the opportunity
to observe conditions at the proposed infiltration locations at the time of excavation.
111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u 3
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
The infiltration rate of the receptor soils will be reduced in the event that fine sediment or
organic materials are allowed to accumulate on the exposed receptor soil surfaces during
construction. The use of an infiltration pond or trench as a temporary sedimentation control
pond during construction has the potential to substantially alter the infiltration rate of the soils.
Use of a storm chamber excavation as a temporary construction phase sedimentation pond is
not recommended.
Operation of heavy equipment may densify the reception soils below the infiltration facilities.
The soils exposed in the bottom of the infiltration facilities should not be compacted. It may be
necessary to scarify the infiltration facilities subgrade to facilitate infiltration.
4.4 Structural Fill Requirements
All fill material placed in structure and non - landscaped areas should be placed in accordance
with the recommendations for structural fill. Prior to placement, the surfaces to receive
structural fill should be prepared as will be presented in the Final Geotechnical Evaluation. All
structural fill should be free of organic material, debris, or other deleterious material. Individual
particle sizes should be less than 3 inches in maximum dimension.
The suitability of soils for use as structural fill depends primarily on the gradation and moisture
content of the soil when it is placed. As the amount of fines (that soil fraction passing the U.S.
No. 200 sieve) increases, soil becomes increasingly sensitive to small changes in moisture
content, and adequate compaction becomes more difficult, or impossible, to achieve.
Generally, soils containing more than about 5 percent fines by weight (based on that soil
fraction passing the U.S. No. 4 sieve) cannot be compacted to a firm, non - yielding condition
when the moisture content is more than a few percent from optimum. The optimum moisture
content is that which yields the greatest soil density under a given compactive effort.
It is our opinion that the existing granular soils encountered (upper 1 to to feet) on the site are
suitable for reuse as structural fill from a compositional standpoint provided that organic material
is not present. However, depending on the time of year that earthwork is completed; drying or
wetting of these soils may be required prior to compaction. Larger particles should be screened
out prior to use as structural fill. Screening of particles larger than 3 inches should be
completed prior to using the sand and gravel soils for structural fill. Selective drying of over -
optimum moisture soils may be achieved by scarifying or windrowing surficial materials during
periods of dry weather. Soils which are dry of optimum may be moistened through the
application of water and thorough blending to facilitate a uniform moisture distribution in the soil
prior to compaction.
Imported soils for use as structural fill should consist of granular (sand and gravel) material.
Structural fill should meet the general requirements of Section 9- 03.14(1), Gravel Borrow, as
111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u 4
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
presented in the Washington State Department of Transportation (WSDOT) Standard
Specifications for Road, Bridge, and Municipal Construction. For wet site conditions or
placement of fill during inclement weather the percent passing the US No. 200 mesh sieve
should be modified to less than 5 percent by weight.
The use of other fill types should be reviewed and approved by the engineer. Structural fill
should be placed and compacted in horizontal lifts, using equipment and procedures that will
produce recommended moisture content and densities throughout the fill. Fill lifts should not
exceed 8 inches in loose thickness.
4.5 Compaction Requirements
Excessive compaction directly above utility elements should be avoided to reduce the risk of
damage.
4.6 Temporary /Permanent Slopes
The contractor is responsible for designing and constructing stable, temporary excavations
(including utility trenches) as required to maintain stability of both the excavation sides and
bottom. Excavations should be sloped or shored in the interest of safety following local and
federal regulations, including current OSHA excavation and trench safety standards.
1111 III w 4 u« 6:!D III u1111 III "" IIIu mlllµlllµu 5
Per the Modified Proctor Test (ASTM D 1557)
Material Type and Location
Minimum
Range of Moisture Contents for
Compaction
Compaction
Requirement ( %)
Minimum Maximum
On -site granular or approved imported fill
soils
0 0
Beneath foundations and concrete slabs:
95
0 0
-2% +2%
Utility trench backfill (upper 2 feet):
95
e e
-2% +2%
Utility trench backfill (below 2 feet):
92
0 0
-2% +2%
Foundation backfill:
92
0 0
-2% +2%
Miscellaneous backfill (non - structural):
90
-2% +2%
Excessive compaction directly above utility elements should be avoided to reduce the risk of
damage.
4.6 Temporary /Permanent Slopes
The contractor is responsible for designing and constructing stable, temporary excavations
(including utility trenches) as required to maintain stability of both the excavation sides and
bottom. Excavations should be sloped or shored in the interest of safety following local and
federal regulations, including current OSHA excavation and trench safety standards.
1111 III w 4 u« 6:!D III u1111 III "" IIIu mlllµlllµu 5
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
We recommend maximum permanent slope configurations for sand and gravel materials as
follows:
Maximum Slope Configuration
Soil Type Horizontal:Vertical (H:V)
Native soil 2H:1 V
Structural fill 2H:1 V
If steeper slopes are required for site development, stability analyses should be completed to
design the grading plan.
5.0 GENERAL COMMENTS
Terracon should be retained to review the final design plans and specifications so comments
can be made regarding interpretation and implementation of our geotechnical recommendations
in the design and specifications. Terracon also should be retained to provide observation and
testing services during grading, excavation, foundation construction and other earth- related
construction phases of the project.
The analysis and recommendations presented in this report are based upon the data obtained
from the explorations performed at the indicated locations and from other information discussed
in this report. This report does not reflect variations that may occur between test pits, across the
site, or due to the modifying effects of construction or weather. The nature and extent of such
variations may not become evident until during or after construction. If variations appear, we
should be immediately notified so that further evaluation and supplemental recommendations
can be provided.
The scope of services for this project does not include either specifically or by implication any
environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or
prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the
potential for such contamination or pollution, other studies should be undertaken.
This report has been prepared for the exclusive use of City of Auburn Public Works Department
for specific application to the project discussed and has been prepared in accordance with
generally accepted geotechnical engineering practices. No warranties, either express or
implied, are intended or made. Site safety, excavation support, and dewatering requirements
are the responsibility of others. In the event that changes in the nature, design, or location of
the project as outlined in this report are planned, the conclusions and recommendations
contained in this report shall not be considered valid unless Terracon reviews the changes and
either verifies or modifies the conclusions of this report in writing.
111111111 III w 4 u « 6:!D III 111111111 III "" IIIu mlllµlllµ u 6
APPENDIX A
FIELD EXPLORATION
17N
Z
c
0 1 , I
M: V!
CIA
kif St sw
3f(i 54
1
WIN
41ti St ��W
�0
11 11711
.... ......
st
st �'Nv
8111 $1 sit
L
III SIP SE
tinIN
eel
� l Sup�l n W
WI st sw
I Sol st sw;
II
16th sk ISE
Bourv.,lao (vPV,1J
4111?t Ave, 1,1114
1f,
^5
I
r
ry
2obbfeet
20114 Microsoft ICor poIr,ation C 2013 PI
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
AERIAL PHOTOGRAPHY PROVIDED
NOT INTENDED FOR CONSTRUCTION PURPOSES
BY MICROSOFT BING MAPS
Project Manager:
Project No.
VICINITY MAP
Exhibit
PDD
B2135014
Drawn by:
PDD
Scale:
AS SHOWN
Irerracon
Auburn M & 0 Facility
Checked by: PDD
File Name: VIM
3006 S. 96th St.
1305 C Street SW
A-1
Approved by: PDDII
Date: 3/19/14
Lakewood, WA
Auburn, WA
LEGEND
1W APPROXIMATE
TP -3 TEST PIT LOCATIONS
Basemap PDF provided by Google and
modified by TERRACON.
ERPDD
w
a" ezlseola
SITE AND EXPLORATION PLAN
Fll, ri;
EMG
AS SHOWN
Con sWbn9En9ineersana Scienir6
AUBURN M &O FACILITY
FUUM Ztlwg
�
AUBURN, WASHINGTON
/�
A -2
vim.q ,s„
Prepared for CITY OF AUBURN
FE& 2014
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
Field Exploration Description
Our field exploration for this project included 6 test pits completed on December 18, 2013 and
February 5, 2014. TP -2 was the first excavation performed as a part of our exploration. As
such, it was excavated to full depth to determine the general soil profile. TP -2A was excavated
approximately 5 -10 feet east of TP -2 in order to run the infiltration test. The approximate
exploration locations are shown on the Site and Exploration Plan, Figure A -2. The exploration
locations were determined by measuring distances from existing site features. The locations of
the test pits should be considered accurate only to the degree implied by the means and methods
used to define them.
An independent contractor working under subcontract to Terracon performed the test pits. An
engineer from our firm continuously observed the explorations, logged the subsurface
conditions, and obtained representative soil samples. The samples were stored in moisture
tight containers and transported to our laboratory for further visual classification and testing.
After we logged each exploration, the subcontractor backfilled the explorations per Washington
Department of Ecology standards.
The enclosed test pit logs indicate the vertical sequence of soils and materials encountered in
each test pit, based primarily on our field classifications and supported by our subsequent
laboratory testing. Where a soil contact was observed to be gradational or undulating, our logs
indicate the average contact depth. Our logs also indicate the approximate depths of
groundwater seepage observed in the test pits, as well as sample numbers and sampling
locations.
Exhibit A -3
J
J
W
O
Z
C7
O
J
H
Q
U)
O
W
TEST PIT LOG NO. TP -1
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J Q
ai
u.
Q
d
W�
J
d
E
m
Z
W
Approximate Surface Elev. 86.5 (Ft.) +/-
o
Q m
Q
w
DEPTH ELEVATION Ft.
O
a
0 ' ``
4" - 8" GRASS AND TOPSOIL
0 '
0.5 86 +/-
SANDY SILT WITH GRAVEL, dark brown
1.5 85 +/-
®
POORLY GRADED SAND WITH GRAVEL ISPI, with cobbles, dark black -brown
11ti1,
S 1
®
2.5 84 +/-
CLAYEY SANDY SILT (CL-MU, trace gravel, orangish grayish brown
S -2
61
grades to silty fine sand with gravel (probable slough included in sample)
" ti
S -3
29
4.5 82 +/-
Test Pit Terminated at 4.5 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 2/5 /2014 Test
Pit Completed: 2/5 /2014
No groundwater observed
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
IProject No.: B2135014
Exhibit: A-4
J
J
W
0
z
0
0
J
a
U)
O
W
cD
TEST PIT LOG NO. TP -2
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J a
ai
u.
Q
d
W�
J
d
E
m
z
W
Approximate Surface Elev. 85.5 (Ft.) +/-
o
Q m
Q
w
DEPTH ELEVATION Ft.
O
a
0.2 1/2" ASPHALT over 2" crushed base course 85.5+/ -
POORLY GRADED SAND WITH SILT AND GRAVEL (SP-SMI, dark grayish brown, moist
S -1
1.0 84.5+/ -
SILT WITH SAND AND GRAVEL (MU, dark purplish gray, moist
Nb(.
I
S -2
57
3.0 82.5+/ -
SILT IMLI, trace sand, moist
S -3
92
4.0 81.5+/ -
ORGANIC SILT IOU, some interbedded sand layers, black, moist
4.5 81 +/-
ORGANIC SILT WITH SAND to SILTY SAND IOU, fine grained, brownish gray, moist
5
S -4
7.0 78.5+/ -
`VI
POORLY GRADED SAND WITH SILT to SILTY SAND (SP-SMI, fine grained, brown -gray
S-5
7.5 78 +/-
ORGANIC SILT IOU, reddish brown
8.0 77.5+/ -
Test Pit Terminated at 8 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 12/18/2013 Test
Pit Completed: 12/18/2013
No groundwater observed
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
IProject No.: B2135014
Exhibit: A -5
J
J
W
O
Z
C7
O
J
H
Q
U)
O
W
TEST PIT LOG NO. TP -2A
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J Q
ai
u.
Q
d
W�
J
d
E
m
Z
W
Approximate Surface Elev. 85.5 (Ft.) +/-
o
Q m
Q
w
DEPTH ELEVATION Ft.
O
a
0.3 1/2" ASPHALT over 3" crushed base course 85 +/-
®
POORLY GRADED SAND WITH SILT AND GRAVEL (SP-SMI, light brown, moist
1.3 84 +/-
SILT WITH SAND (MU,, dark brown, moist
grades to poorly graded fine sand, trace silt, moist
3.0 82.5+/ -
Test Pit Terminated at 3 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 12/18/2013 Test
Pit Completed: 12/18/2013
No groundwater observed
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
Project No.: B2135014
Exhibit: A -6
J
J
W
O
Z
C7
O
J
H
Q
U)
O
W
TEST PIT LOG NO. TP -3
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J Q
ai
u.
Q
(D
d
o
W�
J
d
E
m
Z
W
C7
Approximate Surface Elev 84 (Ft.) +/-
m
Q
w
DEPTH ELEVATION Ft.
O
a
ORGANIC SILT IOU, dark reddish brown, moist
0.3 83.5+/-
SILT IMU, trace fine sand, tan and gray, damp
S -1
ddY('
grades to silt with sand, light gray with orange mottling
`ytif
S-2
grades to clayey silt, trace sand, with distinct mottling
grades to silty sand
S -3
37
grades to silt, trace sand
" ti
S -4
l ,
5
S -5
grades to light gray and wet
6.0 78 +/-
Test Pit Terminated at 6 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 12/18/2013 Test
Pit Completed: 12/18/2013
While sampling
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
Project No.: B2135014
Exhibit: A -7
J
Lu
O
z
C7
0
J
H
Q
U)
O
W
TEST PIT LOG NO. TP -4
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J Q
ai
u.
Q
d
W�
J
d
E
m
z
W
Approximate Surface Elev. 84.5 (Ft.) +/-
o
Q m
Q
w
DEPTH ELEVATION Ft.
O
a_
FILL - POORLY GRADED GRAVEL IGPI
m
0.3 +/
SANDY SILT [MU,, with gravel, brown with gray, moist
S -1
1.0 83.5+/ -
GRAVELLY SANDY SILT [MU, trace clay, brown with gray, moist (gravel was subrounded, with
approximate 4" top size)
cddY('
S -2
l ,
2.0 82.5+/ -
SILT IMLI, trace sand, gray with heavy rust mottling to stained orange, moist
db(„
S -3
3.0 81.5+/ -
SANDY SILT [MU, trace gravel, tan to grayish brown, wet
S -4
50
5
grades to silt with clay, dark grayish brown
" ti >
S -5
l ,
6.5 78 +/-
11ti1,
SILT WITH SAND AND CLAY [MU, with organics (log), wet
S-6
7.0 77.5+/ -
Test Pit Terminated at 7 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 12/18/2013 Test
Pit Completed: 12/18/2013
No groundwater observed
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
IProject No.: B2135014
Exhibit: A -8
J
J
W
0
Z
C7
O
J
H
Q
U)
0
W
TEST PIT LOG NO. TP -5
Page 1 of 1
PROJECT: Auburn M&O
CLIENT: City of Auburn
SITE: 1305 C Street SW
Auburn, WA
00
LOCATION See Exhibit A -2
w Z
d
w
�
H
O
W
J Q
ai
u.
Q
d
W�
J
d
E
m
Z
W
Approximate Surface Elev 85.5 (Ft.) +/-
o
Q m
Q
w
ELEVATION Ft.
O
a_
2" mulch (FILL)
TDEPT..H
ILS T IMLI, dark gray, moist
POORLY GRADED SAND ISPI, trace to with organic silt, fine grained, light gray to tan, moist
S -1
1
2.5 83 +/-
ORGANIC SILT WITH SAND IOLI, gray with orange mottling, moist to wet, strong organic odor
S -2
dVti
I
S -3
88
3.5 82 +/-
ORGANIC SILT IOLI, trace sand, wet (roots)
5
S -4
5.5 8o +/-
Test Pit Terminated at 5.5 Feet
Stratification lines are approximate. In -situ, the transition may be gradual.
Advancement Method:
See Exhibit A -3 for description of field procedures.
Notes:
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
Abandonment Method:
Backf Iled with soil cuttings upon completion.
abbreviations.
Estimated from topographic map
WATER LEVEL OBSERVATIONS
Test Pit Started: 12/18/2013 Test
Pit Completed: 12/18/2013
No groundwater observed
Ifierracon
Excavator:
Operator: NW Excavating
2115 S. 56th St., Suite 405
Tacoma, Washington
Project No.: B2135014
Exhibit: A -9
APPENDIX B
LABORATORY TESTING
Geotechnical Subgrade Evaluation,
Auburn M &O Facility Auburn, Washington Irerracali
March 19, 2014 11111111, Terracon Project No. B2135014
Laboratory Testing
Descriptive classifications of the soils indicated on the boring logs are in accordance with the
enclosed General Notes and the Unified Soil Classification System. Also shown are estimated
Unified Soil Classification Symbols. A brief description of this classification system is attached
to this report. All classification was by visual manual procedures.
Laboratory tests were conducted on selected soil samples and the test results are presented in
this appendix and /or on the exploration logs. The laboratory test results were used for the
development of the recommendations. Laboratory tests were performed in general accordance
with the applicable ASTM, local or other accepted standards.
Selected soil samples obtained from the site were tested for the following engineering
properties:
iiiiiiiiii Sieve Analysis
Graphical results of the sieve analyses are included in this appendix
N
U
W
N
U
z
c�
95
90
85
80
75
70
65
x
LD 60
w
>- 55
m
ry
Z 50
U-
1-- 45
w
ry 40
w
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 1.5 ' 3/4 "'3/8 s 4 n 8 I 14 "n 20 s� 40 5V 60 1VV140'VV
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001 I
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -1 2.5 CL -ML - Clayey sandy silt
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
W TP -1 2.5 25 9.0 30.1 61.0
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 12135014
Irerracon CLIENT: City of Auburn
2115 S. 56th St., Suite 405
Tacoma, Washington EXHIBIT: B -1
N
U
W
N
U
z
cD
95
90
85
80
75
70
65
x
LD 60
W
>- 55
m
ry
Z 50
U-
1-- 45
W
ry 40
W
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 3/4 "'3/8 s 4 n 8 I 14 "n 20 s� 40 5V 60 1VV140'VV
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001 I
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -1 4.0 SM - Silty fine sand with gravel
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
W TP -1 4.0 37.5 0.306 0.076 28.8 41.8 29.4
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 12135014
Irerracon CLIENT: City of Auburn
2115 S. 56th St., Suite 405
Tacoma, Washington EXHIBIT: B -2
N
U
W
N
U
z
cD
95
90
85
80
75
70
65
x
LD 60
W
>- 55
m
ry
Z 50
U-
1-- 45
W
ry 40
W
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 3/4 "'3/8 s 4 n 8 I 14 "n 20 s� 40 5V 60 1VV140'VV
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001 I
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -2 1.0 ML - Silt with sand and gravel
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
1 TP -2 1.0 37.5 0.09 24.5 18.8 56.7
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 12135014
Irerracon CLIENT: City of Auburn
2115 S. 56th St., Suite 405
Tacoma, Washington EXHIBIT: B -3
N
U
W
N
U
z
c�
Ivv
95
90
85
80
75
70
r
65
x
LD 60
w
>- 55
Co
ry
Z 50
U-
1-- 45
w
ry 40
w
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS
4 3 ' 1.5 1 3/4 u'3/8 s n 8 IV 14 m 20 sv 40 5v 60 1 vv 140 wv
100
HYDROMETER
10 1 0.1 0.01 0.001 I
GRAIN SIZE IN MILLIMETERS
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depthl USCS Classification LL PL PI Cc Cu
1* TP -2 3.5 ML - Silt
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
1* TP -2 3.5 6.35 0.1 8.0 91.9
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 82135014
CLIENT: City of Auburn
EXHIBIT: B -4
N
U
W
N
U
z
c�
95
90
85
80
75
70
65
x
LD 60
w
>- 55
m
ry
Z 50
U-
1-- 45
w
ry 40
w
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
8.
.
1 ■ ■■■ 111111■■■ IYIIYI�■■ i�11Y111� ■i�■■IIIIII ■ ■ ■IIIII� ■ ■■
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001 I
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -3 3.5 SM - Silty sand
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
1 TP -3 3.5 4.75 0.101 0.0 62.9 37.1
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 12135014
Irerracon CLIENT: City of Auburn
2115 S. 56th St., Suite 405
Tacoma, Washington EXHIBIT: B -5
N
U
W
N
U
z
c�
95
90
85
80
75
70
65
x
LD 60
w
>- 55
m
ry
Z 50
U-
1-- 45
w
ry 40
w
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
1 ■ ■■■ 111111 ■ ■■IYli�i� ■ICi�11�1111■ ■■■1111111 ■■ ■111111 ■ ■■
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001 I
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -4 3.5 ML - Sandy silt
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
TP -4 3.5 9.5 0.123 1.4 48.3 50.3
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 12135014
Irerracon CLIENT: City of Auburn
2115 S. 56th St., Suite 405
Tacoma, Washington EXHIBIT: B -6
N
U
W
N
U
z
cD
Ivv
95
90
85
80
75
70
r
65
x
LD 60
W
>- 55
Co
ry
Z 50
U-
1-- 45
W
ry 40
W
CL
35
30
25
20
15
10
5
0
GRAIN SIZE DISTRIBUTION
ASTM D422
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS
4 3 ' 1.5 1 3/4 �3/8 s 4 0 8 IV 14 "D 20 sv 40 ov 60 'VV 140 wv
100
HYDROMETER
10 1 0.1 0.01 0.001 I
GRAIN SIZE IN MILLIMETERS
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse
I fine
coarse
I medium
I fine
Boring ID Depth USCS Classification LL PL PI Cc Cu
TP -5 3.0 OL - Organic silt with sand
Boring ID Depthl Dj, D, D, D,o %Gravel %Sand %Silt I %Clay
1 TP -5 3.0 12.5 0.4 12.0 87.5
PROJECT: Auburn M &O
SITE: 1305 C Street SW
Auburn, WA
PROJECT NUMBER: 82135014
CLIENT: City of Auburn
EXHIBIT: B -7
APPENDIX C
SUPPORTING DOCUMENTS
GENERAL NOTES
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS E H
DESCRIPTIVE SOIL CLASSIFICATION
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and
silts if they are slightly plastic or non - plastic. Major constituents may be added as modifiers and minor constituents may be
added according to the relative proportions based on grain size. In addition to gradation, coarse - grained soils are defined
on the basis of their in -place relative density and fine - grained soils on the basis of their consistency.
LOCATION AND ELEVATION NOTES
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand -held GPS device. The accuracy
of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was
conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic
maps of the area.
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Descriptive Term(s) Percent of Maior Component Particle Size
of other constituents Dry Weiaht of Sample
Trace < 15 Boulders Over 12 in. (300 mm)
With 15-29 Cobbles 12 in. to 3 in. (300mm to 75mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand #4 to #200 sieve (4.75mm to 0.075mm
Silt or Clay Passing #200 sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Term(s) Percent of Term Plasticity Index
of other constituents Dry Weiaht Non - plastic 0
Trace < 5 Low 1 -10
With 5-12 Medium 11 - 30
Modifier > 12 High > 30
Irerracon Exhibit C -1
Water Initially (HP) Hand Penetrometer
Encountered
Auger Split Spoon � Water Level After a (T) Torvane
Specified Period of Time
' � J � Water Level After rn
� b/ Standard Penetration
W a Specified Period of Time I-
> Test (blows per foot)
Z Shelby Tube Macro Core W
J J Water levels indicated on the soil boring � (PID) Photo - Ionization Detector
IL � logs are the levels measured in the �
� W borehole at the times indicated. J
� Q Groundwater level variations will occur � (OVA) Organic Vapor Analyzer
Ring Sampler Rock Core � over time. In low permeability soils,
accurate determination of groundwater
levels is not possible with short term
water level observations.
Grab Sample No Recovery
RELATIVE DENSITY OF COARSE - GRAINED SOILS
CONSISTENCY OF FINE - GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
(50% or more passing the No. 200 sieve.)
Density determined by Standard Penetration Resistance
Consistency determined by laboratory shear strength testing, field
Includes gravels, sands and silts.
visual- manual procedures or standard penetration resistance
�
Descriptive Term
Standard Penetration or
Ring Sampler
Descriptive Term
Unconfined Compressive
Standard Penetration or
Ring Sampler
�
(Density)
N -Value
glows /Ft.
(Consistency)
Strength, Qu, tsf
N -Value
glows /Ft.
Q'
Blows /Ft.
Blows /Ft.
W
F
Very Loose
0-3
0 - 6
Very Soft
less than 0.25
0-1
< 3
2
~
Loose
4 -9
7 -18
Soft
0.25 to 0.50
2 -4
3 -4
Z
W
Q'
Medium Dense
10-29
19-58
Medium -Stiff
0.50 to 1.00
4-8
5 - 9
F
RELATIVE DENSITY OF COARSE - GRAINED SOILS
CONSISTENCY OF FINE - GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
(50% or more passing the No. 200 sieve.)
Density determined by Standard Penetration Resistance
Consistency determined by laboratory shear strength testing, field
Includes gravels, sands and silts.
visual- manual procedures or standard penetration resistance
�
Descriptive Term
Standard Penetration or
Ring Sampler
Descriptive Term
Unconfined Compressive
Standard Penetration or
Ring Sampler
�
(Density)
N -Value
glows /Ft.
(Consistency)
Strength, Qu, tsf
N -Value
glows /Ft.
Q'
Blows /Ft.
Blows /Ft.
W
F
Very Loose
0-3
0 - 6
Very Soft
less than 0.25
0-1
< 3
2
~
Loose
4 -9
7 -18
Soft
0.25 to 0.50
2 -4
3 -4
Z
W
Q'
Medium Dense
10-29
19-58
Medium -Stiff
0.50 to 1.00
4-8
5 - 9
F
�
Dense
30-50
59-98
Stiff
1.00 to 2.00
8-15
10 - 18
Very Dense
> 50
> 99
Very Stiff
2.00 to 4.00
15-30
19-42
Hard
> 4.00
> 30
> 42
UNIFIED SOIL CLASSIFICATION SYSTEM
A Based on the material passing the 3 -inch (75 -mm) sieve
B If field sample contained cobbles or boulders, or both, add "with cobbles
or boulders, or both" to group name.
° Gravels with 5 to 12% fines require dual symbols: GW -GM well - graded
gravel with silt, GW -GC well - graded gravel with clay, GP -GM poorly
graded gravel with silt, GP -GC poorly graded gravel with clay.
° Sands with 5 to 12% fines require dual symbols: SW -SM well - graded
sand with silt, SW -SC well - graded sand with clay, SP -SM poorly graded
sand with silt, SP -SC p(Ds,,) orly graded sand with clay
E Cu = D60 /D10 Cc= z
" If fines are organic, add "with organic fines" to group name.
' If soil contains >_ 15% gravel, add "with gravel" to group name.
j If Atterberg limits plot in shaded area, soil is a CL -ML, silty clay.
" If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel,"
whichever is predominant.
L If soil contains >_ 30% plus No. 200 predominantly sand, add "sandy" to
group name.
M If soil contains >_ 30% plus No. 200, predominantly gravel, add
"gravelly" to group name.
" PI >_ 4 and plots on or above "A" line.
° PI < 4 or plots below "A" line.
D10 x D60 P PI plots on or above "A" line.
F If soil contains >_ 15% sand, add "with sand" to group name. o PI plots below "A" line.
G If fines classify as CL -ML, use dual symbol GC -GM, or SC -SM.
60
For classification of fine- grained
Soil Classification
Classification
Criteria for Assigning
Group Symbols and Group Names Using Laboratory Tests A
Group
Group B
50 of coarse - grained soils
V
Symbol
Equation of "A" - line
Gravels:
Clean Gravels:
Cu >_ 4 and 1 < Cc < 3 E...
GW
Well- graded gravel F ....
More than 50% of
Less than 5% fines °
Cu < 4 and /or 1 > Cc > 3 E
GP
Poorly graded gravel F
Z Vertical at LL =16 to P1 =7, ,/'
coarse fraction retained
Gravels with Fines:
Fines classify as ML or MH
GM
Silty gravel F.G."
Coarse Grained Soils:
on No. 4 sieve
More than 12% fines
° Fines classify as CL or CH
GC
Clayey gravel F,G.H
More than 50% retained
on No. 200 sieve
Sands:
Clean Sands:
Cu >_ 6 and 1 <_ Cc <_ 3 E
SW
Well- graded sand'
50% or more of coarse
Less than 5% fines °
Cu < 6 and /or 1 > Cc > 3 E
SP
Poorly graded sand'
CL r
fraction passes No. 4
Sands with Fines:
Fines classify as ML or MH
SM
Silty sand G' "'
sieve
More than 12% fines
° Fines classify as CL or CH
SC
Clayey sand G' "'
o '
PI > 7 and plots on or above "A" line
CL
Lean clay" `"
90 100
Silts and Clays:
Inorganic:
PI < 4 or plots below "A" line j
ML
Silt K M
Liquid limit less than 50
Liquid limit - oven dried
Organic clay K.F,M N
Fine - Grained Soils:
Organic:
< 0.75
Liquid limit -not dried
OL
K,�.nn.o
Organic sLl�
50% or more passes the
No. 200 sieve
PI plots on or above "A" line
CH
Fat clay
Silts and Clays:
Inorganic:
PI plots below "A" line
MH
Elastic Silt K,L.n
Liquid limit 50 or more
Liquid limit - oven dried
Organic clay K.F,M P
Organic:
< 0.75
Liquid limit - not dried
OH
Organic silt K,L.n,.o
Highly organic soils:
Primarily organic matter, dark in color, and organic odor
PT
Peat
A Based on the material passing the 3 -inch (75 -mm) sieve
B If field sample contained cobbles or boulders, or both, add "with cobbles
or boulders, or both" to group name.
° Gravels with 5 to 12% fines require dual symbols: GW -GM well - graded
gravel with silt, GW -GC well - graded gravel with clay, GP -GM poorly
graded gravel with silt, GP -GC poorly graded gravel with clay.
° Sands with 5 to 12% fines require dual symbols: SW -SM well - graded
sand with silt, SW -SC well - graded sand with clay, SP -SM poorly graded
sand with silt, SP -SC p(Ds,,) orly graded sand with clay
E Cu = D60 /D10 Cc= z
" If fines are organic, add "with organic fines" to group name.
' If soil contains >_ 15% gravel, add "with gravel" to group name.
j If Atterberg limits plot in shaded area, soil is a CL -ML, silty clay.
" If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel,"
whichever is predominant.
L If soil contains >_ 30% plus No. 200 predominantly sand, add "sandy" to
group name.
M If soil contains >_ 30% plus No. 200, predominantly gravel, add
"gravelly" to group name.
" PI >_ 4 and plots on or above "A" line.
° PI < 4 or plots below "A" line.
D10 x D60 P PI plots on or above "A" line.
F If soil contains >_ 15% sand, add "with sand" to group name. o PI plots below "A" line.
G If fines classify as CL -ML, use dual symbol GC -GM, or SC -SM.
60
For classification of fine- grained
soils and fine - grained fraction
z'
50 of coarse - grained soils
V
Equation of "A" - line
J
CL Horizontal at PI =4 to LL =25.5. X
- then PI =0.73 (LL -20)
10\
40
Wp Equation of "U" - line ,'
�at
Z Vertical at LL =16 to P1 =7, ,/'
G
>- 30 then PI =0.9 (LL -8) '
0
00 20 ........... ............................... ........... 0r .........................
.
MH or OH
CL r
10 r
7 _ L - ML ML or OIL
o '
0 10 16 20 30 40 50
60 70 80
90 100
110
LIQUID
LIMIT (LL)
Irerracon Exhibit C-2
APPENDIX D
MOUNDING ANALYSIS
Auburn M &O
M()w::„ P I B2135014 m, u� :r January 25, 2013 G
OBJECTIVE
Perform mounding analysis for infiltration trench.
Trerracon
p: �o 1 1
I� . „ ,tl
RTS i N 11 w � II N 11 1 ','
GIVENS
• Two ponds, with total dimensions: 20'x 820'x 6' deep (45 maximum design depth) *This maybe
unconservative if less than 20% of the water is routed to Pond 4.
• Impervious surfaces draining to ponds: 5.20 acres
ASSUMPTIONS
• Low - permeability stratum is sufficiently low so as not to affect mounding
• Elevation conversion: NAVD 1988 Elevation = NGVD 1929 Elevation + 3.527 feet
• Long -term saturated drainage: 0.112 ft/hr (from infiltration test at TP -4)
• Top elevation of trench: 84' to 84.5' (use 84.2')
• Design high water level: 82.7'
• Bottom elevation of trench: 78' to 78.5' (78.2')
• Groundwater elevation: 76.25 ft (4/26/12)
• Directly Connected Impervious Area: 100% (all pervious surfaces ignored in this analysis)
• 10:1 horizontal /vertical conductivity ratio
• Design event: 1.44 " /24 hr
• Rainfall distribution: SCS Type IA
• Kvu Factor of Safety: 2.0
CALCULATIONS
Time of concentration
Time of concentration can be calculated using the following formula:
L
T, = 60V
Where T, is the time of concentration (min), L is the longest flow length to the trench (ft), and V is the average
velocity (ft) along that travel path. From "Technical Release 55: Urban Hydrology for Small Watersheds ", for a
paved travel path, at an estimated slope of 1.6% over 210 horizontal feet (from the provided topographical
map), V = 2.6 ft /sec.
210
T — = 1.35 minutes
60(2.6)
The software MODRET, by Scientific Software Group, was used to characterize mounding at this site. Inputs
are shown on the following pages. Average effective storage coefficient of soil for unsaturated and saturated
analyses comes from Table A -1 in the MODRET manual.
text]
MODRET
HYDROGRAPH DATA INPUT - SCS UNIT METHOD
Project Name: AuburnSCS
Rainfall Distribution : SCS Type IA (24 hrs)
Contributing Basin Area
5.20 ac.
SCS Curve Number
92.00
Time of Concentration
1.35 min.
Rainfall Depth
1.44 in.
Shape Factor
256
Percent DCIA
100.00 %
Analysis Date: 1/26/2014
MODRET
SUMMARY OF UNSATURATED & SATURATED INPUT PARAMETERS
PROJECT NAME: Auburn012614
HYDROGRAPH RUNOFF DATA USED
UNSATURATED ANALYSIS INCLUDED
Pond Bottom Area
Pond Volume between Bottom & DHWL
Pond Length to Width Ratio (L /W)
Elevation of Effective Aquifer Base
Elevation of Seasonal High Groundwater Table
Elevation of Starting Water Level
Elevation of Pond Bottom
Design High Water Level Elevation
Avg. Effective Storage Coefficient of Soil for Unsaturated Analysis
Unsaturated Vertical Hydraulic Conductivity
Factor of Safety
Saturated Horizontal Hydraulic Conductivity
Avg. Effective Storage Coefficient of Soil for Saturated Analysis
Avg. Effective Storage Coefficient of Pond /Exfiltration Trench
Time Increment During Storm Event
Time Increment After Storm Event
Total Number of Increments After Storm Event
Runoff Hydrograph File Name: aubscs.scs
Time of Peak Runoff: 7.70 hrs
Rate of Peak Runoff: 1.78 cfs
Hydraulic Control Features:
Groundwater Control Features - Y/N
Distance to Edge of Pond
Elevation of Water Level
Impervious Barrier - Y/N
Elevation of Barrier Bottom
Analysis Date: 1/26/2014
16,400.00 ftz
73,800.00 ft3
41.00
58.93 ft
76.25 ft
78.20 ft
78.20 ft
82.70 ft
0.11
2.69 ft/d
2.00
26.90 ft/d
0.11
1.00
1.00 hrs
10.00 hrs
6.00
Top Bottom Left Right
N N N N
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
N N N N
0.00 0.00 0.00 0.00
MODRET
SUMMARY OF RESULTS
PROJECT NAME: Auburn012614
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (ds)
AVERAGE
INFILTRATION
RATE (ds)
CUMULATIVE
OVERFLOW
(ft3)
00.00-0.01
76.250
0.000
0.00000
0.01
76.250
0.25530
0.25530
5.47
78.200
0.25530
0.00
0.25530
6.47
78.230
0.25530
0.00
0.25530
7.47
78.295
0.25530
0.00
0.25530
8.47
78.516
0.25530
0.00
0.25530
9.47
78.580
0.25530
0.00
0.25530
10.47
78.608
0.25530
0.00
0.25530
11.47
78.624
0.25530
0.00
0.25530
12.47
78.632
0.25530
0.00
0.25530
13.47
78.635
0.25530
0.00
0.25530
14.47
78.635
0.25530
0.00
0.25530
15.47
78.631
0.25530
0.00
0.25530
16.48
78.624
0.25530
0.00
0.25530
17.48
78.616
0.25530
0.00
Analysis Date: 1/26/2014
MODRET
SUMMARY OF RESULTS
PROJECT NAME: Auburn012614
CUMULATIVE
TIME
(hrs)
WATER
ELEVATION
(feet)
INSTANTANEOUS
INFILTRATION
RATE (ds)
AVERAGE
INFILTRATION
RATE (ds)
CUMULATIVE
OVERFLOW
(ft3)
0.25530
18.48
78.604
0.25530
0.00
0.25530
19.48
78.589
0.25530
0.00
0.25530
20.48
78.573
0.25530
0.00
0.25530
21.48
78.556
0.25530
0.00
0.25530
22.48
78.537
0.25530
0.00
0.25530
23.48
78.518
0.25258
0.00
0.21992
30.06
78.200
0.14479
0.00
0.06967
47.48
77.755
0.06106
0.00
0.05246
59.48
77.617
0.00
Maximum Water Elevation: 78.635 feet @ 14.47 hours Recovery @ 30.064 hours
* Time increment when there is no runoff
Maximum Infiltration Rate: 1.345 ft /day
Analysis Date: 1/26/2014
C
O
N
W
N
(6
INFILTRATION: AUBURN012614
2 4 6 8 10 12 14 16 18 20 22 24 26 28
Time (hrs)
Max Water Elevation = 78.64 ft
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 6 hrs
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 8 hrs
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 12 hrs
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 18 hrs
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 23 hrs
7£
7£
7£
7£
►I
c
0
7
0
w
7
►ri
7£
7£
7£
7£
CROSS SECTION : Auburn012614
-70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
DISTANCE ALONG X AXIS (ft)
CROSS SECTION ALONG X AXIS AT Y AXIS = 0.00 ft @ 25 hrs