Loading...
HomeMy WebLinkAboutDRAFT-2015 City of Auburn Comprehensive Sewer Plan.pdf Comprehensive Sewer Plan Prepared for City of Auburn, Washington March 13, 2015 701 Pike Street, Suite 1200 Seattle, WA 98101-2310 Phone: 206-624-0100 Fax: 206-749-2200 Comprehensive Sewer Plan Prepared for City of Auburn, Washington March 13, 2015 This is a draft and is not intended to be a final representation of the work done or recommendations made by Brown and Caldwell. It should not be relied upon; consult the final report. v DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table of Contents List of Figures ............................................................................................................................................... ix List of Tables ................................................................................................................................................ x List of Abbreviations .................................................................................................................................... xi Executive Summary ..................................................................................................................................... 1 ES.1 LOS Goals ................................................................................................................................... 2 ES.2 Evaluation of the Sewer Utility .................................................................................................. 3 ES.3 Implementation Plan ................................................................................................................. 3 ES.3.1 6-Year and 20-Year CIP ............................................................................................... 3 ES.3.2 Monitoring .................................................................................................................... 6 ES.3.3 Asset Management and Maintenance and Operations ............................................ 6 1. Introduction .........................................................................................................................................1-1 1.1 Purpose and Objectives ..........................................................................................................1-1 1.2 Document Organization ..........................................................................................................1-2 2. Background .........................................................................................................................................2-1 2.1 Previous Auburn Comprehensive Sewer Plans .....................................................................2-1 2.2 City Comprehensive Plan........................................................................................................2-1 2.3 Sanitary Sewer Service Area ..................................................................................................2-1 2.4 Existing Land Use Plans .........................................................................................................2-1 2.4.1 King County Comprehensive Plan ...........................................................................2-1 2.4.2 King County Regional Wastewater Services Plan ...................................................2-2 2.4.3 City of Auburn Water Resources Protection Report ...............................................2-7 2.5 Neighboring Sewer Utilities ....................................................................................................2-7 2.5.1 Soos Creek Water and Sewer District and City of Kent .........................................2-7 2.5.2 City of Pacific ............................................................................................................2-7 2.5.3 Muckleshoot Indian Tribe Reservation ...................................................................2-7 2.5.4 Lakehaven Utility District .........................................................................................2-8 2.5.5 City of Algona ............................................................................................................2-8 2.5.6 City of Bonney Lake ..................................................................................................2-8 2.5.7 King County ...............................................................................................................2-8 3. Wastewater System Policies ..............................................................................................................3-1 3.1 Sewer Comprehensive Plan Policies, Standards, and Guidelines .......................................3-1 3.2 City Comprehensive Plan and Auburn City Code Goals and Policies ...................................3-1 3.3 Sanitary Sewer Level of Service .............................................................................................3-1 3.4 Business Practices Policy .......................................................................................................3-2 Table of Contents City of Auburn Comprehensive Sewer Plan vi DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4. Description of Existing System ..........................................................................................................4-1 4.1 Overview ..................................................................................................................................4-1 4.1.1 Valley Sewer Basin ...................................................................................................4-1 4.1.2 West Hill Sewer Basin ..............................................................................................4-1 4.1.3 Lea Hill Sewer Basin .................................................................................................4-2 4.1.4 Auburn Way South Sewer Basin ..............................................................................4-2 4.1.5 South Hill Sewer Basin .............................................................................................4-2 4.2 Sanitary Sewer Facilities ........................................................................................................4-2 4.2.1 Critical Infrastructure ...............................................................................................4-7 4.2.2 Pump Stations ..........................................................................................................4-7 4.2.3 Gravity and Force Main Collection System .............................................................4-8 4.2.4 Side Sewer Laterals..................................................................................................4-8 4.2.5 River Crossings .........................................................................................................4-8 4.3 King County Conveyance ..................................................................................................... 4-12 4.4 Infiltration and Inflow ........................................................................................................... 4-12 4.5 Industrial Waste Discharges ............................................................................................... 4-12 4.6 Water Reclamation and Reuse ........................................................................................... 4-13 4.6.1 Regulatory Framework .......................................................................................... 4-14 4.6.2 Potential Reclaimed Water Sources ..................................................................... 4-14 4.6.3 Potential Reclaimed Water Users ......................................................................... 4-15 4.6.4 Reclaimed Water Summary .................................................................................. 4-15 5. Wastewater System Analysis .............................................................................................................5-1 5.1 Hydraulic Capacity Analysis ....................................................................................................5-1 5.1.1 Hydrologic and Hydraulic Model ..............................................................................5-1 5.1.2 Assessment Criteria .................................................................................................5-1 5.1.3 Existing-Conditions Evaluation ................................................................................5-2 5.1.4 Future-Conditions Evaluation ..................................................................................5-4 5.2 Inflow and Infiltration ........................................................................................................... 5-11 5.2.1 Initial Inflow and Infiltration Assessment ............................................................. 5-11 5.3 Sewer Extensions ................................................................................................................. 5-15 5.4 Asset Management .............................................................................................................. 5-21 6. Maintenance and Operations ............................................................................................................6-1 6.1 Utility Responsibility and Authority ........................................................................................6-1 6.1.1 Organizational Structure ..........................................................................................6-1 6.1.2 Staffing Level ............................................................................................................6-2 6.1.3 Level of Service ........................................................................................................6-3 6.1.4 Operator Training and Education ............................................................................6-3 City of Auburn Comprehensive Sewer Plan Table of Contents vii DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 6.2 Routine Operations .................................................................................................................6-3 6.2.1 Pump Station Maintenance .....................................................................................6-3 6.2.2 Collection System Maintenance ..............................................................................6-5 6.2.3 Field Operations .......................................................................................................6-6 6.3 Fats, Oils, and Grease Reduction Program ...........................................................................6-6 6.4 Non-Routine and Emergency Operations ..............................................................................6-7 6.4.1 Customer Service Requests ....................................................................................6-7 6.4.2 Emergency Response Program ...............................................................................6-8 6.5 Communications, Data Collection, and Record-Keeping .....................................................6-8 6.5.1 Telemetry and Pump Station Controls ....................................................................6-8 6.5.2 Data Collection and Record-Keeping ......................................................................6-9 6.6 Existing Staffing Requirements ........................................................................................... 6-10 6.7 Potential Improvement Opportunities and Capital Needs ................................................ 6-11 7. Recommended Plan ...........................................................................................................................7-1 7.1 Capital Improvement Program ...............................................................................................7-1 7.1.1 Project Priority...........................................................................................................7-2 7.1.2 Project Cost ...............................................................................................................7-2 7.2 Project Summary.....................................................................................................................7-2 8. Finance ................................................................................................................................................8-1 8.1 Past Financial Performance ...................................................................................................8-1 8.1.1 Statement of Revenues, Expenses, and Changes in Net Position ........................8-1 8.1.2 Statement of Net Position ........................................................................................8-2 8.1.3 Outstanding Debt Principal ......................................................................................8-5 8.2 Available Capital Funding Resources ....................................................................................8-5 8.2.1 Internal Utility Resources .........................................................................................8-5 8.2.2 Government Programs and Resources ...................................................................8-7 8.2.3 Public Debt Financing ..............................................................................................8-9 8.2.4 Capital Resource Funding Summary .................................................................... 8-10 8.3 Financial Plan ....................................................................................................................... 8-10 8.3.1 Utility Fund Structure ............................................................................................ 8-11 8.3.2 Financial Policies ................................................................................................... 8-11 8.3.3 Capital Funding Plan ............................................................................................. 8-12 8.4 Financial Forecast ............................................................................................................... 8-14 8.4.1 Cash Flow Test ....................................................................................................... 8-14 8.4.2 Coverage Test ........................................................................................................ 8-14 8.4.3 Financial Forecast ................................................................................................. 8-14 8.4.4 City Funds and Reserves Balances ...................................................................... 8-17 8.5 Existing Rate Structure and Projected Schedule ............................................................... 8-17 8.6 Affordability .......................................................................................................................... 8-18 8.7 Conclusion ............................................................................................................................ 8-19 Table of Contents City of Auburn Comprehensive Sewer Plan viii DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 9. Implementation Plan ..........................................................................................................................9-1 9.1 6-Year and 20-Year CIP ..........................................................................................................9-1 9.2 Monitoring ...............................................................................................................................9-2 9.3 Asset Management and Maintenance and Operation .........................................................9-3 9.3.1 Collect Asset Data ....................................................................................................9-3 9.3.2 Criticality ...................................................................................................................9-7 9.3.3 Defining Maintenance Strategies ............................................................................9-7 9.3.4 Condition Assessments ............................................................................................9-9 9.3.5 Continual Improvement ........................................................................................ 9-10 9.4 Discharge Quality Control .................................................................................................... 9-10 9.4.1 Control of Fats, Oils, and Greases ........................................................................ 9-10 9.4.2 Industrial Waste..................................................................................................... 9-10 9.4.3 Public Education .................................................................................................... 9-10 9.5 Hazard Planning ................................................................................................................... 9-10 9.6 Maintenance Issues ............................................................................................................ 9-11 9.6.1 105th Place SE and Lea Hill Road SE .................................................................. 9-11 9.6.2 Sewers Crossing Freeway ..................................................................................... 9-11 9.6.3 Sewers within Easements ..................................................................................... 9-11 9.7 Schedule............................................................................................................................... 9-11 10. Limitations ................................................................................................................................... 10-1 11. References ................................................................................................................................... 11-1 Appendix A: Inter-local Agreements and Outside Agency Correspondence ......................................... B-1 Appendix B: Hydraulic Capacity Analysis ................................................................................................ B-1 Appendix C: Pump Station Information ....................................................................................................C-1 City of Auburn Comprehensive Sewer Plan Table of Contents ix DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx List of Figures Figure ES-1. Implementation schedule ...................................................................................................... 7 Figure 2-1. Vicinity .....................................................................................................................................2-3 Figure 2-2. Plan study area ......................................................................................................................2-5 Figure 4-1. Sewer service basins .............................................................................................................4-3 Figure 4-2. Existing wastewater conveyance system .............................................................................4-5 Figure 4-3. Critical sewers ........................................................................................................................4-9 Figure 4-4. City of Auburn collection system summary statistics ....................................................... 4-11 Figure 4-5. Potential reclaimed water users within Auburn city limits ............................................... 4-17 Figure 5-1. HGL for surcharged condition ...............................................................................................5-2 Figure 5-2. Wastewater model network and results: existing conditions, 20-year flow .......................5-5 Figure 5-3. Wastewater model network and results: future conditions, 20-year flow ..........................5-9 Figure 5-4. Primary components of an I/I management program ...................................................... 5-12 Figure 5-5. Inflow and infiltration comparative levels ......................................................................... 5-13 Figure 5-6. Existing and proposed sewer facilities .............................................................................. 5-17 Figure 5-7. Sewer extension for unsewered areas estimated costs .................................................. 5-19 Figure 6-1. City of Auburn Department of Community Development and Public Works organizational chart ...................................................................................................................................................6-2 Figure 7-1. CIP development flow chart ..................................................................................................7-1 Figure 9-1. Sanitary sewers with missing attribute information ............................................................9-5 Figure 9-2. Example of identifying asset criticality .................................................................................9-7 Figure 9-3. Maintenance strategies based on risk .................................................................................9-8 Figure 9-4. City of Auburn Sewer Plan implementation timeline ........................................................ 9-12 Table of Contents City of Auburn Comprehensive Sewer Plan x DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx List of Tables Table ES-1. Utility Level of Service .............................................................................................................. 2 Table ES-2. Annual CIP Project Cost Summary .......................................................................................... 5 Table 3-1. Sewer Comprehensive Plan Policies ......................................................................................3-2 Table 4-1. City of Auburn Sewer Pump Station Inventory .......................................................................4-7 Table 4-2. City of Auburn Industrial Waste Discharge Permits ........................................................... 4-13 Table 5-1. Simulated 20-Year Flows to Pumping Stations, Existing Conditions Scenario ...................5-4 Table 5-2. Simulated 20-Year Flows to Pumping Stations, Future (2020) Conditions Scenarioa .......5-8 Table 6-1. Sewer Utility M&O Field Personnel .........................................................................................6-2 Table 6-2. Sewer System Maintenance and Operation Task Summary ............................................. 6-11 Table 7-1. Annual Project Cost Summary for 6-Year and 20-Year CIP ..................................................7-3 Table 8-1. City of Auburn Statement of Revenues, Expenses and Changes in Fund Net Position ......8-2 Table 8-2. City of Auburn Statement of Net Position ..............................................................................8-4 Table 8-3. City of Auburn Outstanding Debt Principal ............................................................................8-5 Table 8-4. City of Auburn Sewer CIP ........................................................................................................8-6 Table 8-5. City of Auburn Capital Financing Plan ................................................................................. 8-13 Table 8-6. City of Auburn Current System Development Charge Schedule ....................................... 8-13 Table 8-7. City of Auburn Financial Forecast ....................................................................................... 8-16 Table 8-8. City of Auburn Cash Balance Summary .............................................................................. 8-17 Table 8-9. City of Auburn Projected Local Rate Schedule ................................................................... 8-18 Table 8-10. City of Auburn Affordability Test ........................................................................................ 8-18 Table 9-1. Annual Project Cost Summary for 6-Year CIP (in millions of dollars) ...................................9-1 Table 9-2. Cost Summary for 20-Year CIP (in millions of dollars) ..........................................................9-2 Table 9-3. Criticality-Based Maintenance Strategy Summary ................................................................9-9 City of Auburn Comprehensive Sewer Plan Table of Contents xi DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx List of Abbreviations ACC Auburn City Code AMWA Association of Metropolitan Water Agencies APWA American Public Works Association BAB Build America Bonds bgs below ground surface ccf 100 cubic feet CCTV closed-circuit television CDPW Community Development and Public Works Department CERB Community Economic Revitalization Board CFP Capital Facilities Program CIP Capital Improvement Program City City of Auburn CMMS computerized maintenance management system Comp Plan City of Auburn Comprehensive Plan CSI Conveyance System Improvements CSWD Criteria for Sewage Works Design d/D depth to pipe diameter DOH Washington State Department of Health Ecology Washington State Department of Ecology Engineering Engineering Services Division EPA U.S. Environmental Protection Agency FOG fats, oils, and grease fps foot/feet per second FSE food service establishment FTE full-time equivalent GIS geographic information system GO general obligation gpad gallon(s) per acre day gph gallons per hours gpm gallon(s) per minute H&H hydrologic and hydraulic HDPE high-density polyethylene pipe HGL hydraulic grade line I/I inflow and infiltration IT Innovation and Technology LACP Lateral Assessment and Certification Program LEED Leadership in Energy and Environmental Design lf linear feet LFC local facilities charge LOS level of service LUD Lakehaven Utility District M&O maintenance and operations MACP Manhole Assessment and Certification Program MBR membrane bioreactor MIT Muckleshoot Indian Tribe MUD Muckleshoot Utility District NASSCO National Association of Sewer Service Companies PAA potential annexation area PACP Pipeline Assessment and Certification Program PdM predictive maintenance Plan Comprehensive Sewer Plan PM preventive maintenance psi pound(s) per square inch PSRC Puget Sound Regional Council PVC polyvinyl chloride PWB Public Works Board RCE residential customer equivalent RCW Revised Code of Washington R&R repair and replacement RWSP Regional Wastewater Services Plan SARA Superfund Amendments and Reauthorization Act of 1986 SCADA supervisory control and data acquisition SCAQMD South Coast Air Quality Management District SCWSD Soos Creek Water and Sewer District SDC system development charge SEPA State Environmental Protection Act SOS Save Our Streets SSO sanitary sewer overflow SSSA sanitary sewer service area ULID utility local improvement district Utility Sanitary Sewer Utility WAC Washington Administrative Code WSDOT Washington State Department of Transportation WWCPA Washington Wastewater Collection Personnel Association ES-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Executive Summary This Comprehensive Sewer Plan (Plan) for the City of Auburn, Washington (City) is an update to the previous plan that was completed in December 2009 (Brown and Caldwell). Evaluation of the sanitary sewer system for this Plan incorporated a policy review; system-wide hydraulic modeling; review and documentation of maintenance and operations (M&O) practices; and evaluation and update of the Capital Improvement Program (CIP) to account for completed projects, changes in system conditions, and new development, as well as to incorporate new financial information. This Plan contains time frames that are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these time frames are estimates and, depending on factors involved in the processing of applications and project work, and availability of funding, the timing may change from the included time frames. The framework does not represent actual commitments by the City, which may depend on resources available. The purpose of the Plan is to guide the City’s Sanitary Sewer Utility (Utility) with respect to future activities and improvements for the Utility. To fulfill this stated purpose, the following objectives were achieved: • provide background information regarding development and planning of the Utility, the sanitary sewer service area (SSSA), and neighboring utilities (Chapter 2) • evaluate environmental, social, and regulatory drivers to develop level-of-service (LOS) goals for capital facility infrastructure development, operation, maintenance, and other key elements of utility management (Chapter 3) • characterize the current sewer system and facilities (Chapter 4) • perform a hydraulic modeling analysis to evaluate system capacity, review inflow and infiltration (I/I), identify possible sewer extensions to provide City sewer service to the entire SSSA, and provide a means to update the economic life model (Chapter 5) • establish a baseline understanding of the proactive and responsive maintenance procedures to evaluate Utility staffing and data collection needs (Chapter 6) • develop a CIP based on the results of hydraulic and condition analyses by meeting required customer service levels, effectively managing risks, and minimizing the City’s costs of sewer asset ownership (Chapter 7) • develop a funding plan that optimizes use of rates, system development charges (SDCs), and/or other service fees based on projected Utility spending requirements and a review of funding sources and City financial policies (Chapter 8) • prioritize capital improvement projects and repair and replacement (R&R) activities to accommodate both 6- and 20-year funding frameworks and create an implementation plan to meet LOS goals (Chapter 9) The following sections summarize the development of the Plan and outline the recommendations contained in the implementation plan. Executive Summary City of Auburn Comprehensive Sewer Plan ES-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx ES.1 LOS Goals LOS goals provide a framework for the Utility to assess its staffing levels, prioritize its resources, justify its rate structure, and document its successes. It is important that LOS goals include clear criteria to use in evaluating how well those goals are being met. LOS goals for the Utility that were developed for this Plan are based on relevant City policies. LOS goals and associated City polices are listed in Table ES-1. Table ES-1. Utility Level of Service Item* Policy, standard, or guideline statement Planning considerations 6 The City will size gravity sewers for peak wet weather flow rates that include I/I flows. Gravity sewers will be sized to convey the once-per-20-year peak hour flow without surcharging. 7 The City will size pump stations and force mains for peak wet weather flow rates that include I/I flows. Pump stations will be sized to convey the once-per-5-year flow with one pump out of service and convey the once-per-20-year flow with all pumps in service. Protection and improvement of the environment and public health 16 The City will comply with all federal, state, and local regulations in operation and maintenance of the City’s wastewater collection and conveyance infrastructure. 17 The City will evaluate Utility activities to emphasize sustainability practices. City staff will identify specific areas to measure sustainability. Examples could include weighing energy consumption impacts more heavily during capital project development, selecting less impactful cleaning and maintenance products, and structuring maintenance activities to minimize vehicle travel miles. While maintaining minimum flows for efficient operation of the system, water conservation will be practiced whenever possible. City staff will benchmark practices and log changes. 18 The City will support the use of reclaimed water technologies where economically feasible. City staff will evaluate opportunities for reclaimed water use and support initiatives where the benefits outweigh costs. 19 The City shall pursue I/I reduction for the purposes of eliminating or reducing required capacity upgrades and reducing maintenance costs (to include reducing wear and tear on pump stations) when determined to be cost-effective. Customer satisfaction 20 The City will evaluate and strive to maintain customer satisfaction with Utility service delivery. • The City will create a baseline against which to evaluate future improvements: • Annual assessment of complaints/citizen reports • The City will communicate proactively with the community and stakeholders regarding wastewater service improvements. Utility financing 35 Appropriate rates and SDCs shall be assessed to fund the ongoing maintenance, operation, and capital expenditures of the Utility, in accordance with the Comprehensive Wastewater Plan. Periodic (typically every 5 years) cost-of-service studies shall be completed to reassess the monthly service and SDCs (both City and King County portions). Updates will coincide with 6-year CIP updates. 36 The City will track the cost of claims as a metric. The City will create a baseline against which to evaluate future improvements. 37 The City will track schedule and budget accuracy and performance in CIP implementation. Business practice 41 The City will monitor the frequency and causes of any service disruptions and develop programmatic methods for reducing the number of disruptions (e.g., backups). The City will investigate all customer service calls within 24 hours and record results in the computerized maintenance management system (CMMS). The City will develop an M&O plan to set goals for minimizing blockages, backups, response time, etc. 42 The City will maintain an asset criticality database to be used in prioritizing asset maintenance and R&R. The existing criticality database will be refined to include more asset age and material information, and will be validated using the results of M&O inspections. The database will transition from a spreadsheet-based process to an internal process within the City’s CMMS. 43 The City will perform condition assessments of critical assets. The City will develop and implement a condition assessment schedule for all critical assets. City of Auburn Comprehensive Sewer Plan Executive Summary ES-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table ES-1. Utility Level of Service Item* Policy, standard, or guideline statement 44 The City will assign industry standard design lives for sewage assets. The actual physical assessment will be compared to the theoretical design life to determine the optimal economic life. The City will attempt to repair or replace system assets before they exceed their economic life. The number of high-criticality assets beyond their economic life will be minimized. 45 The City will conduct maintenance activities at a level that is consistent with optimizing system reliability, asset economic life, and system performance. The City will develop schedules for maintenance of wastewater collection and conveyance assets and link its implementation to system performance; e.g., record instances of missed maintenance and identify inadequate performance related to maintenance (grease and roots blockages) including missed scheduled maintenance. 46 The City will maintain a level of reliability for pump stations provided by redundancy of critical mechanical and electrical components. The City will provide backup power generators or dual power feeds and provide a minimum of two pumps at each City pump station. 47 The City will implement the use of the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) for inspection of all pipelines, Lateral Assessment and Certification Program (LACP) for inspection of all laterals, and Manhole Assessment and Certification Program (MACP) for inspection of all manholes. The City will minimize the number of assets with condition grades of 4 and 5. * Item numbers refer to the policy item number presented in Table 3-1 in Section 3.4. ES.2 Evaluation of the Sewer Utility In order to develop a plan for future improvements to the Utility, the existing collection system was evaluated. This included hydraulic modeling and a review of M&O practices, which are described below: • Hydraulic modeling: The existing hydraulic model developed in the 2009 plan was recalibrated with King County flow monitoring data. The hydraulic capacity analysis of the City’s sewer conveyance system assessed the capacity for current and projected wastewater flows. The analysis also provided the basis for identifying improvements that may be necessary for the City to provide the adopted LOS. The hydraulic model indicated that, based on current planning and growth assumptions, there are no capacity-related issues for both current and future conditions. • Maintenance and operation: The City provided information on its M&O activities to include ongoing maintenance activities, the number of staff required to undertake the activity, and frequency of activities. Current staffing levels were compared to anticipated staffing levels required to meet the City’s desired operation goals listed in Chapter 6. The results of this analysis indicate that, to meet these goals, two additional M&O staff are required and the creation of a new position is recommended to facilitate computerized maintenance management system (CMMS) integration across all three service utilities (Sewer, Water, Drainage). ES.3 Implementation Plan The implementation plan brings together information from the preceding chapters to form a work plan of future activities for the Utility. The implementation plan consists of the 6-year and 20-year CIP, recommendations including monitoring and data collection, and recommendations for using asset management strategies to improve Utility maintenance and operations with an outlook on long-term sustainability. ES.3.1 6-Year and 20-Year CIP The CIP projects consist primarily of ongoing and programmatic capital improvements. Ongoing projects include projects identified through previous studies. The City has previously allocated funding to each of these projects, which are currently in various stages of execution. These projects Executive Summary City of Auburn Comprehensive Sewer Plan ES-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx must continue to receive funding under the CIP until completion and have been included in this Plan to provide a complete picture of the program. Programmatic projects are included in the CIP to provide funding for maintaining and/or improving the LOS. These projects do not address a specific problem, but allocate budget for addressing LOS goals. The results of the system evaluation indicated very few new projects to be added to the 6-year CIP. The system hydraulic analysis indicated no need for capacity-related capital projects. Table ES-2 lists nine capital improvement projects included in this Plan and lays out annual expenditures for the 6-year and 20-year CIP time frames. City of Auburn Comprehensive Sewer Plan Executive Summary ES-5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table ES-2. Annual CIP Project Cost Summary Project number Project name Priority 2016 2017 2018 2019 2020 2021 2022–35 Project Cost CIP allocations (repair/ replacement) CIP allocations (upgrade/ expansion) 1 Sanitary Sewer Repair and Replacement/System Improvements 1 $1,873,000 $300,000 $1,500,000 $300,000 $1,500,000 $300,000 $12,600,000 $18,373,000 100% 0% 2 Street Utility Improvements 1 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $2,800,000 $4,000,000 100% 0% 3 Vactor Decant Facility 1 $150,000 $0 $0 $0 $0 $0 $0 $150,000 0% 100% 4 Sewer Pump Station Replacement/ Improvement 1 $0 $141,000 $500,000 $168,000 $900,000 $141,000 $2,850,000 $4,700,000 100% 20% 5 Siphon Assessment 1 $0 $524,000 $0 $0 $0 $0 $524,000 $1,048,000 100% 0% 6 Pump Station Condition Assessment 1 $187,000 $0 $0 $0 $0 $0 $187,000 $374,000 100% 0% 7 Manhole Ring and Cover Replacement 2 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $1,120,000 $1,600,000 100% 0% 8 Cleaning and Inspection of Large-Diameter Pipe 2 $0 $400,000 $0 $0 $0 $0 $400,000 $800,000 100% 0% 9 Inflow and Infiltration Study 3 $0 $135,200 $135,200 $135,200 $135,200 $135,200 $0 $676,000 100% 0% 10 Plan Update 1 $0 $0 $0 $0 $350,000 $0 $700,000 $1,050,000 50% 50% Total cost for priority 1 projects $2,410,000 $1,165,000 $2,200,000 $668,000 $2,950,000 $641,000 $19,661,000 $29,695,000 Total cost for priority 2 projects $80,000 $480,000 $80,000 $80,000 $80,000 $80,000 $1,520,000 $2,400,000 Total cost for priority 3 projects $0 $135,200 $135,200 $135,200 $135,200 $135,200 $0 $676,000 Total CIP cost $2,490,000 $1,780,200 $2,415,200 $883,200 $3,165,200 $856,200 $21,181,000 $32,771,000 Executive Summary City of Auburn Comprehensive Sewer Plan ES-6 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx ES.3.2 Monitoring The current and projected future levels of I/I within the City’s collection system do not appear to cause capacity-related issues. However, high I/I can be indicative of either deteriorating pipe condition or storm drainage connections to the sewer system so, to be proactive, it is recommended that the City initiate additional flow monitoring that can be used during the next Plan update to further assess I/I and add confidence to the hydraulic model. ES.3.3 Asset Management and Maintenance and Operations The following additional recommendations were made for activities that will support asset management and ongoing M&O: • Continue system inventory: Asset management practices and M&O activities can best be utilized with a completed inventory of assets owned and maintained by the City. Many of the City’s assets are currently included in Cartegraph, its CMMS, but not all assets are currently included and some assets are missing important identifying information (such as age and material of construction). Completing the asset inventory will help the City continue to best apply its M&O resources. • Migrate the economic life model to the CMMS: The economic life model created as part of the 2009 plan should be implemented with the CMMS to facilitate use and most up-to-date model accuracy. • Optimize M&O program: Optimizing M&O activities through an asset management-based program will lead to increased effectiveness in prioritizing M&O resources and managing risk, public perception, regulatory compliance, and costs to the Utility. • Discharge quality control: The City should continue its efforts to minimize the impact of harmful components in the sewage discharged to the City’s collection system. Specifically, the fats, oils, and grease (FOG) reduction program, industrial waste permitting, and public education programs support the collection system’s ability to convey and pump sewage effectively and the County treatment facility’s ability to protect the environment. • Hazard planning: The City should assess vulnerability of the sewer collection system to examine the potential for natural disasters such as flood, erosion, earthquake, or volcanic activity to cause system failures. The associated probabilities of failure should be weighed with the consequences of failure to determine if action is necessary and to identify appropriate mitigation measures. • Maintenance issues: Three known problem sites did not rise to the level of a CIP project based on currently available information. It is recommended that the City investigate these known M&O issues. The issues include odor issues near the 8th Street siphon and access issues with sewers crossing freeways and those within easements on private property. A timeline was developed to illustrate how CIP and monitoring activities in the implementation plan fit together within 6-year and 20-year time frames. This timeline is presented on Figure ES-1. City of Auburn Comprehensive Sewer Plan Executive Summary ES-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number Project name 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 6-year CIP 7–20-year CIP 1 Sanitary Sewer Repair & Replacement/System Improvements 2 Street Utility Improvements 3 Vactor Decant Study 4 Sewer Pump Station Replacement/Improvement 5 Siphon Assessment 6 Pump Station Condition Assessment 7 MH Ring and Cover Replacement 8 Cleaning and Inspection of Large-Diameter Pipe 9 Inflow and Infiltration Study 10 Plan Update Figure ES-1. Implementation schedule 1-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 1 Introduction This Comprehensive Sewer Plan Update (Plan) for the City of Auburn, Washington (City) is an update to the previous plan, prepared in 2009. This Plan reflects changes in existing and projected land use and population since the previous plan, as well as sewer capital projects that have been constructed. In addition, since the previous plan, King County has performed extensive flow monitoring of the City’s collection system that, along with updated asset information, provides valuable information for updating the hydrologic and hydraulic (H&H) model used for assessing system capacity. This Plan contains time frames that are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these time frames are estimates and, depending on factors involved in the processing of applications and project work and availability of funding, the timing may change from the included time frames. The framework does not represent actual commitments by the City, which may depend on resources available. This Plan meets the requirements of the Washington State Department of Ecology (Ecology) as set forth in Washington Administrative Code (WAC) Section 173-240-050. The Plan was submitted to Ecology; the Washington State Department of Health (DOH); King and Pierce counties; the cities of Algona, Bonney Lake, Kent, and Pacific; Lakehaven Utility District (LUD); Soos Creek Water and Sewer District (SCWSD); and the Muckleshoot Indian Tribe (MIT). Relevant correspondence with these agencies related to this Plan is included in Appendix A. 1.1 Purpose and Objectives The purpose of the Plan is to guide the City with respect to future activities and improvements for the Sanitary Sewer Utility (Utility). To fulfill this stated purpose, the following objectives were achieved: • evaluate environmental, social, and regulatory drivers to develop level-of-service (LOS) goals for capital facility infrastructure development, operation, maintenance, and other key elements of Utility management • update the comprehensive sanitary sewer system inventory, based on the City’s geographic information system (GIS), that incorporates currently available infrastructure data into a digital database that can be directly linked with the hydraulic model used for analyzing the system • perform hydraulic modeling analysis to evaluate system capacity • develop a plan for sewer service extensions, including where extensions will occur and how the City will serve these areas • document the City’s existing Maintenance and Operation (M&O) program, and evaluate existing Utility staffing • complete a financial analysis of the Utility, including a projection of cost to provide sewer service and development of a funding strategy for the identified LOS goals • develop a capital improvement program (CIP) by sustainably meeting required customer service levels, effectively managing risks, and minimizing the City’s costs of sewer asset ownership • prioritize capital improvement projects to accommodate both 6- and 20-year funding frameworks Chapter 1 City of Auburn Comprehensive Sewer Plan 1-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 1.2 Document Organization This Plan is organized to focus on the actions that the Utility will take while implementing Plan recommendations. Supporting documentation and background information is included in appendices where appropriate. The Plan is organized into the following chapters: Chapter 1 Introduction: explains the need for updating previous sewer planning documentation, and outlines specific objectives of the Comprehensive Sewer Plan Update Chapter 2 Background: provides background information regarding the Utility and sanitary sewer service area (SSSA) Chapter 3 Wastewater System Policies: specifies the Utility policies and LOS goals used to develop capital improvements and future M&O activities Chapter 4 Description of Existing System: describes the existing conditions of the City’s sanitary sewer system Chapter 5 Wastewater System Analysis: presents methodologies used to evaluate system capacity and future sewer extensions Chapter 6 Recommended Plan: describes recommended capital improvement projects including cost estimates Chapter 7 Maintenance and Operations: provides an overview of the organization and common procedures associated with the ongoing M&O program, and evaluates existing Utility staffing needs based on established LOS goals Chapter 8 Finance: develops a funding plan that optimizes use of rates, systems development charges, and/or other service fees based on projected Utility spending requirements and a review of funding sources and City financial policies Chapter 9 Implementation Plan: prioritizes capital improvement projects and lays out a future work plan Appendix A Inter-local Agreements and Outside Agency Correspondence: provides copies of inter- local agreements related with sanitary sewer conveyance and disposal Appendix B Hydraulic Capacity Analysis: provides a detailed review of the hydraulic modeling completed for near- and long-term modeling scenarios to identify areas of capacity concern Appendix C Pump Station Information: provides detailed information related to the pump stations (pump sizes, wet well size, etc.) 2-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 2 Background This chapter includes background information related to the development of the City’s current wastewater collection and conveyance system, including changes to the City’s Comprehensive Plan (Comp Plan) policies that influence the design and operation of the system. Also included is a description of the City SSSA along with information on adjacent sewer utilities, which will facilitate an understanding of existing and potential opportunities for collaborative activities with other purveyors to enhance system reliability or reduce costs. Changes to land use planning efforts affecting the City SSSA are also discussed. The city of Auburn vicinity is shown on Figure 2-1. 2.1 Previous Auburn Comprehensive Sewer Plans The current wastewater planning effort supersedes previous plans prepared in 1968, 1982, 2001, and 2009. This Plan builds upon concepts established in the four previous plans, modifying or updating goals, policies, and analyses to account for present conditions. 2.2 City Comprehensive Plan The City most recently revised its Comp Plan in June 2015. The City Comp Plan incorporates the Comprehensive Sewer Plan by reference. 2.3 Sanitary Sewer Service Area The City SSSA has not changed significantly since the 2009 Comprehensive Sewer Plan, which proposed the extension of service to a small area of unincorporated King County located west of Algona that abutted the existing SSSA. Service has now been extended to that area. The current SSSA is shown on Figure 2-2. The City coordinates service at the boundary of its SSSA with nearby sewer utilities. When the City’s SSSA extends beyond current corporate limits, a franchise is required by the City of Auburn to own, maintain, and manage the wastewater facilities within King and Pierce counties’ rights-of-way. This coordination with other utilities and King and Pierce counties is discussed in Section 2.5. 2.4 Existing Land Use Plans Various land use plans govern development with the City of Auburn SSSA; these plans are described in the following sections. 2.4.1 King County Comprehensive Plan Urban unincorporated areas of the City’s SSSA are subject to the King County Comprehensive Plan, as most recently updated and adopted in November 2013. This section describes changes in the King County document affecting policy direction for functional plans, such as this City of Auburn Comprehensive Sewer Plan Update. Chapter 2 City of Auburn Comprehensive Sewer Plan 2-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx In the updated 2013 King County Comprehensive Plan, policy F-255 states: In the Urban Growth Area, all new development shall be served by public sewers unless: a. Application of this policy to a proposal for a single-family residence on an individual lot would deny all reasonable use of the property; or b. Sewer service is not available for a proposed short subdivision of urban property in a timely or reasonable manner as determined by the Utility Technical Review Committee. These on-site systems shall be managed by one of the following entities, in order of preference: 1. The sewer utility whose service area encompasses the proposed short subdivision; or 2. The provider most likely to serve the area; or; 3. an Onsite Sewage System Maintainer certified by the Seattle-King County Department of Health. The onsite system shall meet all state and county approval requirements. The approved short subdivision shall indicate how additional lots to satisfy the minimum density requirement of the zoning will be located on the subject property in case sewers become available in the future. There shall be no further subdivision of lots created under this policy unless served by public sewers. In conjunction with policy F-255, policy F-256 states: In the Urban Growth Area, King County and sewer utilities should jointly prioritize the replacement of on-site systems that serve existing development with public sewers, based on the risk of potential failure. King County and sewer utilities should analyze public funding options for such conversion and should prepare conversion plans that will enable quick and cost-effective local response to health and pollution problems that may occur when many on-site systems fail in an area. Chapter 5 discusses potential sewer extensions within currently unsewered areas. The City’s SSSA currently includes two areas of unincorporated King County, as shown on Figure 2-2. 2.4.2 King County Regional Wastewater Services Plan In 2007, King County adopted a revised Regional Wastewater Services Plan (RWSP), which outlines proposed wastewater conveyance improvements. Improvements that impact the City of Auburn collection and conveyance system include the following: • Stuck River Trunk: new gravity pipe constructed to convey flow away from the M Street Trunk to the Auburn West Interceptor • Pacific Pump Station discharge: new pipe to convey flow north from the Pacific Pump Station to the Auburn West Interceptor • Auburn West Interceptor Parallel: new gravity pipe to replace or parallel an existing portion of the Auburn West Interceptor between 15th Street SW and West Main Street The Stuck River Trunk was completed in 2013. The Pacific Pump Station discharge and Auburn West Interceptor Parallel are currently planned for construction in 2016. In conjunction with the RWSP, the City participated in an inflow and infiltration (I/I) study as a component sewer agency of King County. I/I is discussed in Section 4.4. The County is in the process of updating the Conveyance System Improvements Program based on decennial flow monitoring data and updated land use and population projections. Algona Pacific Bonney Lake Kent Federal Way Sumner COMPREHENSIVE SEWER PLAN 1 inch = 16,667 feet March 2015 P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_2-1_Vicinity.mxd FIGURE 2-1VICINITY 0.5 0 0.5 Miles N L E G E N D King County South Wastewater Treatment Plant King County collection system Auburn City Limits Cities County Boundary Muckleshoot Indian Reservation Hydrography Highway xxx GreenRiver LakeTapps BigSoos Cre e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW Algona Pacific Sumner Kent Area of Bonney Lake served by Auburn Sewer System WhiteRiver Unincorporated King County Unincorporated King County Area of Kent served by Auburn Sewer System SE 277TH ST 15TH ST SW BOUNDARY BLVD SW L A K E TAPPSPAR K W A Y S E COMPREHENSIVE SEWER PLAN March 2015 FIGURE 2-2CITY OF AUBURNCOMPREHENSIVE SEWERPLAN STUDY AREA 3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_2-2_AuburnSewer_StudyArea 11x17.mxd King County Pierce County Legend Auburn SSSA Area of Kent Served by Auburn Area of Pierce County Served by Auburn Area of Bonney Lake served by AuburnOther Sewer Utilities within City of Auburn City of Algona Soos Creek Water and Sewer District City of Kent Lakehaven Utility District Auburn City Boundary County lineAdjacent Cities Algona Kent Pacific Sumner Muckleshoot Indian Reservation Water Streams Streets City of Auburn Sewer Comprehensive Plan Chapter 2 2-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 2.4.3 City of Auburn Water Resources Protection Report As identified in the City’s 2009 Sewer Plan, coordination with the Water Utility will be necessary in the future, as many of the City’s unsewered areas lie within the Water Resource Protection Areas identified in the Water Resources Protection Report completed in 2000. In particular, planning for future wastewater infrastructure could include the importance of removing potential contamination (i.e., onsite sewer systems) from the Water Resource Protection Areas, based on coordination with the Water Utility. 2.5 Neighboring Sewer Utilities The communities that surround the city of Auburn administer their own wastewater conveyance and collection systems. The following sections describe these systems and discuss interlocal agreements between the City and these communities that establish SSSA boundaries and other conditions of service. Neighboring sewer utilities are identified in Figure 2-2. 2.5.1 Soos Creek Water and Sewer District and City of Kent In the northeast corner of the city, within the Lea Hill sewer basin (as shown on Figure 4-1), are small areas served by the SCWSD and the City of Kent. In 2001, prior to annexation, the City of Auburn executed interlocal agreements with SCWSD and Kent establishing sanitary sewer service area boundaries. The agreements enable SCWSD and Kent to provide the most efficient method of sanitary sewer service to this portion of the city while ensuring that the City’s development standards are maintained. Copies of these agreements are included in Appendix A. 2.5.2 City of Pacific An interlocal agreement establishing sanitary sewer service area boundaries between the cities of Auburn and Pacific was executed in 2008. This agreement allows Auburn to provide sanitary sewer service to property located on the eastern portion of Pacific’s municipal boundary, which lies in the vicinity of Auburn’s wastewater infrastructure. The agreement recognizes that Auburn has sufficient wastewater conveyance capacity to support the SSSA with maximum efficiency in the use of existing and future facilities, together with orderly and efficient sanitary sewer planning. A copy of this agreement is included in Appendix A. 2.5.3 Muckleshoot Indian Tribe Reservation The MIT reservation is located within and to the southeast of Auburn city limits, as shown in Figure 2- 2. In 1997, the MIT, Indian Health Service, and City of Auburn entered into an agreement for the City to provide wastewater service to the MIT property located outside city limits, outside the potential annexation area (PAA), and outside the Urban Growth Area. An additional agreement, signed in 2004, outlined improvements to the conveyance system from the south end of the city on Auburn Way South to the connection to King County’s M Street Trunk. Two outcomes of that agreement were that (1) the MIT become a component agency of the King County Wastewater Treatment Division, which officially occurred in July 2004, and (2) the MIT would own a portion of the capacity within the Auburn Way South sewer line for the conveyance of sewage to King County. Lands owned by the MIT within the City SSSA are billed as ordinary ratepayers. Development of lands within the MIT reservation must be in accordance with the agreement approved under Resolution 4902. MIT- related agreements are included in Appendix A. Chapter 2 City of Auburn Comprehensive Sewer Plan 2-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 2.5.4 Lakehaven Utility District In 2004, an interlocal agreement was established between LUD and the City of Auburn delineating a mutual sewer service area boundary within a portion of the West Hill Service Area, an area recently annexed by the City. It was determined that LUD should continue to provide sewer service to this area in an efficient, cost-effective way. An amendment to this agreement was established in 2005, transferring sewer service from LUD to the City for the area known as Jovita Heights-West Hill. Copies of both LUD agreements are included in Appendix A. 2.5.5 City of Algona The city of Algona borders the city of Auburn to the southwest. In 2003, the cities of Algona and Auburn executed an interlocal agreement establishing sanitary sewer service area boundaries. The agreement allows Algona to provide sewer service to a small area in southwest Auburn, within the city limits and adjacent to Algona. Sewer service by Algona provides efficiency in the use of existing and future facilities. A copy of the Algona agreement is included in Appendix A. 2.5.6 City of Bonney Lake An addendum to a 1998 interlocal agreement establishing sanitary sewer service area boundaries between the cities of Bonney Lake and Auburn to roughly coincide with Auburn’s PAA boundaries was executed in February 2005. The addendum added a single parcel to the City SSSA because the parcel was partially located in both Auburn’s and Bonney Lake’s service areas as a result of the previous agreement. In April 2005, an interlocal agreement was established for Auburn to provide sanitary sewer service to a parcel within Bonney Lake’s SSSA (and designated within Pierce County’s Urban Growth Area). The maximum efficiency in the use of existing and future facilities is achieved by having Auburn provide sewer service to this area within Bonney Lake. A subsequent agreement, executed in August 2005, allows for Bonney Lake to serve the parcel in question once a sewer franchise with Pierce County has been secured for the area of Pierce County in which this parcel is located. Copies of both Bonney Lake agreements are included in Appendix A. 2.5.7 King County In 2002, the City of Auburn was granted a sanitary sewer franchise from King County to operate, maintain, repair, and construct sewer mains, service lines, and appurtenances in, over, along, and under County roads and rights-of-way in areas that at that time were located within unincorporated areas of King County. The legal descriptions of the areas covered by that agreement were updated through an amendment approved in January 2013. Copies of the agreement and amendment (Resolution 5027) are included in Appendix A. 3-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 3 Wastewater System Policies This chapter presents policies and standards that guide the operation and development of the City’s wastewater collection and conveyance system. The policies and standards are derived from the City’s Comp Plan, the Auburn City Code (ACC), and the 2009 Comprehensive Sewer Plan. 3.1 Sewer Comprehensive Plan Policies, Standards, and Guidelines This Plan presents a number of policies or standards related to system development, maintenance, funding, and generally how the Utility should operate. Table 3-1 organizes these various policies or standards within topics related to service area, planning consideration, design standards, protection of the environment and public health, customer satisfaction, Utility financing, wastewater quality, business practice, and system performance and reliability. Taken together with the City Comprehensive Plan and ACC, these policies define limits and outline how the wastewater collection system shall be operated and maintained. 3.2 City Comprehensive Plan and Auburn City Code Goals and Policies The City Comp Plan is the City’s growth management plan and contains policies for protecting critical areas and natural resource lands, designating urban growth areas, preparing comprehensive utility plans, and implementing them through capital investments and development regulations. Therefore, the Comp Plan provides a framework of policies for development, expansion, and maintenance of the Utility. The ACC is a collection of all the regulatory and penal ordinances and certain administrative ordinances of the City. Title 13 of the ACC, Water, Sewers, and Public Utilities, contains the ordinances most relevant to how the Utility operates. It is an overarching policy that the Utility will comply and follow the City Comprehensive Plan and ACC. References to the City Comp Plan and ACC are included in Table 3-1 where applicable. 3.3 Sanitary Sewer Level of Service Wastewater utilities have begun to identify and articulate LOSs that define both the public service they provide and a measurable representation of that service. By defining service in a quantifiable way, the Utility is better able to determine whether it is meeting its own minimum performance standards and, conversely, determine whether reallocation of resources or additional funding may be justified to improve performance. Some LOSs might even be set for internal functions for the same reason of helping to prioritize spending by recognizing critical activities. Policies that reflect or help determine the LOS are spread throughout the various parts of Table 3-1, and are annotated with “LOS” under their item number. Chapter 3 City of Auburn Comprehensive Sewer Plan 3-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 3.4 Business Practices Policy The City desires to employ recognized best business practices that result in efficient and cost- effective operation of the Utility. The City shall identify the key business functions within the Utility (e.g., billing, permitting, asset management, and planning) and develop supporting best business practices for each. The Utility will conduct a performance audit every 6 years in conjunction with its capital projects planning cycle to evaluate how well best business practices are being implemented and how effective they are. The City understands that defining and implementing best business practices is a long-term effort and will require a stepwise approach. Given that the Utility is made up largely of physical assets that have the greatest value and deserve the greatest commitment to operate and maintain, the City shall address the business practice of asset management first. Asset management is a systematic approach to maintaining assets in good working order to minimize future costs of maintaining and replacing them, especially to avoid costly deferred maintenance. The best practices for asset management involve systematically basing choices on an understanding of asset condition and performance, risks, and costs in the long term. Asset best practices include: • having knowledge about assets and costs (i.e., detailed inventories) • maintaining desired LOSs confirmed by customers • taking a life-cycle approach to asset management planning • implementing the planned solutions to provide reliable, cost-effective service The Utility shall begin implementing the above best practices during the next planning period and report progress annually. Policy items related to business practice include items 39–46 in Table 3-1. Table 3-1. Sewer Comprehensive Plan Policies Item Policy, standard, or guideline statement Related City Comprehensive Plan policy or Auburn City Code Service Area 1 The City of Auburn comprehensive planning includes the provision for future sewer service to all properties located within its current city limits and potential annexation area. CF-1, EN-9 2 The Utility will consider, but not encourage, providing sanitary sewer service to properties outside the SSSA. Property owners outside the SSSA bear the burden of approaching adjacent sewer providers for service. 3 The Utility does not intend to extend sanitary sewer service to or through King County rural zoned property. LU-8, LU-10 4 Development where sewer service is not readily available may be served by individual onsite systems if the individual lots are suitable for onsite systems per the requirements and approval of King County or Pierce County Department of Health. ACC 13.20.060 13.20.080 13.20.090 Planning Considerations 5 Future land use patterns for the SSSA are expected to correspond to existing uses or current designations. CF-22 6 LOS The City will size the sewer collection system for peak wet weather flow rates that include I/I flows. Gravity sewers will be sized to convey the once-per-20-year peak hour flow without surcharging. 7 LOS The City will size pump stations and force mains for peak wet weather flow rates that include I/I flows. Pump stations will be sized to convey the once per 5-year flow with one pump out of service and convey the once per 20-year flow with all pumps in service. City of Auburn Sewer Comprehensive Plan Chapter 3 3-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 3-1. Sewer Comprehensive Plan Policies Item Policy, standard, or guideline statement Related City Comprehensive Plan policy or Auburn City Code Design Standards 8 The City has the authority to set design standards. The technical criteria used by the City for the design and construction of its sanitary sewer infrastructure are based on the most recent versions of the Ecology publication Criteria for Sewage Works Design (CSWD) and Washington State Department of Transportation (WSDOT)/American Public Works Association (APWA) Standard Specifications. The City’s modifications and supplements to this criterion are found in the City’s Engineering Design Standards and Construction Standards. ACC 13.20.270 9 It is the City’s policy to transport sewage by gravity as the most cost-effective method. 10 If public pump stations are required, the City will give preference to the construction of fewer large pump stations over a greater number of smaller pump stations. 11 The City prefers to serve all properties by gravity sewer. Pumped systems will be allowed only when it is not feasible to install a total gravity system. 12 Non-gravity services (e.g., grinder pumps and low-pressure force mains) are prohibited except in extenuating circumstances when service by gravity is infeasible. The cost of installation, operation, and maintenance of a low-pressure system shall be borne by the property owner, community association, developer, etc. The City will not install, own, or maintain any part of a low-pressure system. 13 All work on side sewers shall be completed with City licensed side sewer contractors. Side sewer contractors shall have adequate financial resources for posting all required bonds commensurate with the size and type of work. 14 Properties will be required to connect to the public sewer system in accordance with requirements listed in the ACC. ACC 13.20.060 15 Private sewer systems are allowed within the SSA as long as they are designed and operated per City standards, including access, and not part of sewer extensions to other parcels. Multiple connections per parcel are allowed. ACC 13.20.500 Protection and Improvement of the Environment and Public Health 16 LOS The City will comply with all federal, state, and local regulations in operation and maintenance of the City’s wastewater collection and conveyance infrastructure. 17 LOS The City will evaluate Utility activities to emphasize sustainability practices. City staff will identify specific areas to measure sustainability. Examples could include weighing energy consumption impacts more heavily during capital project development, selecting less impactful cleaning and maintenance products, and structuring maintenance activities to minimize vehicle travel miles. While maintaining minimum flows for efficient operation of the system, water conservation will be practiced whenever possible. City staff will benchmark practices and log changes. 18 LOS The City will support the use of reclaimed water technologies where economically feasible. City staff will evaluate opportunities for reclaimed water use and support initiatives where the benefits outweigh costs. 19 LOS The City shall pursue I/I reduction for the purposes of eliminating or reducing required capacity upgrades and reducing maintenance costs (to include reducing wear and tear on pump stations) when determined to be cost- effective. Customer Satisfaction 20 LOS Utility service delivery. The City will create a baseline against which to evaluate future improvements and comparing to an annual assessment of complaints/citizen reports. The City will communicate proactively with the community and stakeholders regarding wastewater service improvements. Utility Financing ACC 13.20.044, 13.20.048, 13.20.410, 13.20.440 21 Capacity issues within the existing system created by future development should be funded by future developers. CF-23, CF-25, CF-6 22 The Utility shall implement an adequate system of internal financial controls and shall adopt an annual budget. Chapter 3 City of Auburn Comprehensive Sewer Plan 3-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 3-1. Sewer Comprehensive Plan Policies Item Policy, standard, or guideline statement Related City Comprehensive Plan policy or Auburn City Code 23 The Utility shall remain a self-supported enterprise fund; however, grants and other alternative financing may be sought and used. 24 The funding for the CIP shall be sustained at a level sufficient to maintain system integrity. 25 The Utility shall establish fees and charges to recover all Utility costs related to development. CF-3, CF-23, CF-25 26 Sewer rates shall be established at a level sufficient to pay expenses and maintain adequate reserves. 27 Sewer rates shall be evaluated as part of the budgeting process. 28 The sewer rate structure shall allocate costs fairly among different customer classes. 29 Rates charged shall be uniform for all Utility customers of the same class throughout the SSSA. 30 Rate assistance programs may be provided for qualified specific low-income seniors or totally or permanently disabled citizens. 31 The Utility should maintain adequate reserves for operation and maintenance, capital improvement, and Sewer revenue bond obligations in order to ensure that the Utility can provide continuous, reliable service and meet its financial obligations under reasonably anticipated circumstances. 32 The City shall require new customers to substantially pay for the costs of improvements designed to accommodate growth, while the costs to operate, maintain, repair, and improve the existing system capacity are paid by all sewer system customers. 33 The City will reinvest in Utility capital assets in order to ensure that the integrity of the existing Utility plant and equipment is maintained. This reinvestment is generally referred to as repair and replacement (R&R). CF-25 34 In addition to projects designed to maintain and replace existing facilities, the City shall seek to invest annually in system improvements designed specifically to upgrade the system in order to meet State regulations and the City’s standards and criteria. These improvements may include upgrades to the sanitary sewer supervisory control and data acquisition (SCADA) and data management systems, and upgrades to increase safety for both City personnel and the public, bring noncompliant infrastructure into compliance, and reduce environmental impacts. 35 LOS Appropriate rates and SDCs shall be assessed to fund the ongoing maintenance, operation, and capital expenditures of the Utility, in accordance with the Comprehensive Wastewater Plan. Periodic (typically every 5 years) cost of service studies shall be completed to reassess the monthly service and SDCs (both City and King County portions). Updates will coincide with 6-year CIP updates. 36 LOS The City will track the cost of claims as a metric. The City will create a baseline against which to evaluate future improvements. 37 LOS The City will track schedule and budget accuracy and performance in CIP implementation. Wastewater Quality 38 The City, in cooperation with King County, shall seek to maximize compliance with limits established in the ACC that designate prohibited discharges to the public sanitary sewer. Waters and wastes including, but not limited to, industrial process chemicals; pharmaceuticals; grit; and fats, oils, and greases (FOG) are limited or prohibited from discharge to the public sewer according to the code. ACC 13.20.140, 13.20.156, 13.20.158, 13.20.160 39 The City will actively discourage discharge of “flushable” wipes and other non-dispersible products to the wastewater collection system. ACC 13.20.140 Business Practice 40 The City will develop and implement system improvements, infrastructure renewal (repair, rehabilitation, or replacement), and M&O programs for the wastewater system according to asset management principles that address LOSs, address the triple bottom line (economic, social, and environmental benefits and costs), minimize asset life-cycle costs, and incorporate risk management into decision making. 41 LOS The City will monitor the frequency and causes of any service disruptions and develop programmatic methods for reducing the number of disruptions (e.g., backups). The City will investigate all customer service calls within 24 hours and record results in the computerized maintenance management system (CMMS). The City will develop an M&O plan to set goals for minimizing blockages, backups, response time, etc. City of Auburn Sewer Comprehensive Plan Chapter 3 3-5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 3-1. Sewer Comprehensive Plan Policies Item Policy, standard, or guideline statement Related City Comprehensive Plan policy or Auburn City Code 42 LOS The City will maintain an asset criticality database to be used in prioritizing asset maintenance and R&R. The existing criticality database will be refined to include more asset age and material information, and will be validated using the results of M&O inspections. The database will transition from a spreadsheet-based process to an integral process within the City’s CMMS. 43 LOS The City will perform condition assessments of critical assets. The City will develop and implement a condition assessment schedule for all critical assets. 44 LOS The City will assign industry standard design lives for sewage assets. The actual physical assessment will be compared to the theoretical design life to determine the optimal economic life. The City will attempt to repair or replace system assets before they exceed their economic life. The number of high-criticality assets beyond their economic life will be minimized. 45 LOS The City will conduct maintenance activities at a level that is consistent with optimizing system reliability, asset economic life, and system performance. The City will develop schedules for maintenance of wastewater collection and conveyance assets and link its implementation to system performance; e.g., record instances of missed maintenance and identify inadequate performance related to maintenance (grease and roots blockages) including missed scheduled maintenance. 46 LOS The City will maintain a level of reliability for pump stations provided by redundancy of critical mechanical and electrical components. The City will provide backup power generators or dual power feeds and provide a minimum of two pumps at each City pump station. 47 LOS The City will implement the use of the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) for inspection of all pipelines, Lateral Assessment and Certification Program (LACP) for inspection of all laterals, and Manhole Assessment and Certification Program (MACP) for inspection of all manholes. The City will minimize the number of assets with condition grades of 4 and 5. System Performance and Reliability 48 The City shall create, update on a routine basis, and use an emergency response plan for critical facilities. 49 The City may work on private property on private assets when the private asset is negatively impacting the public system. If the condition requiring such work is the responsibility of the owner, the City shall seek to recover the costs for the work. ACC 13.20.182, 13.2.510 50 LOS The City may replace or repair private side sewers as part of a City initiated project to reduce I/I of extraneous water into the sanitary sewer system where shown to be cost-effective versus capacity improvements. 51 The City will monitor the frequency, location, and details of all odor-related complaints. At a minimum, the City will respond, research the cause of, and propose control methods once three complaints per month at a site are documented. 52 Adequate measures shall be taken to ensure system security. At a minimum, the City shall maintain security at pump stations by using the SCADA system (motion detection, intrusion alarms) to alert City personnel when unauthorized access is occurring. 53 The City encourages employee participation in workshops, seminars, and other education programs to improve job skills. The City may pay fees and employees’ time for the required certification testing, as well as required annual renewal fees if such certification is a job requirement. 4-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 4 Description of Existing System This chapter describes the existing wastewater collection and conveyance system and SSSA. The City provides wastewater collection service to city residences and businesses through a variety of facilities including gravity sewers, pump stations, and force mains. The wastewater flow is conveyed to the King County Regional Wastewater System for treatment and disposal. The City’s system consists of 15 sewer pump stations1, approximately 5,200 manholes, and approximately 200 miles of sewers and force mains. The City’s system is intended to collect and convey only sanitary flow, but the flow also includes rainfall-derived I/I. According to City staff, there are no known sanitary sewer overflows (SSOs) in the system. 4.1 Overview For purposes of discussion, the City’s wastewater collection system is divided geographically into five major sewer basins. The descriptions of the five major sewer basins (Valley, West Hill, Lea Hill, Auburn Way South, and South Hill) are presented below and shown on Figure 4-1. 4.1.1 Valley Sewer Basin The Valley Sewer Basin is located on the valley floor and contains the oldest portions of the City’s sewer collection system. Three primary King County trunk sewer lines (Stuck River Trunk Sewer, M Street Trunk Sewer, and Auburn West Interceptor Sewer) convey flow from south to north along this sewer basin, providing the backbone for service to Auburn. The Valley Sewer Basin receives flows from the other four sewer basins and conveys these flows to the King County sewer trunk lines. The topography of the valley is very flat with a minor incline, sloping down from the south end of Auburn (elevation 109 feet) to the north end of Auburn (elevation 53 feet). Seven pump stations are located within the Valley Sewer Basin to serve areas unable to reach the King County trunk lines by gravity. The City provides service to two small areas of unincorporated King County, located within the sewer basin. The Valley Sewer Basin is bounded by the Lea Hill and Auburn Way South sewer basins to the east, the South Hill Sewer Basin and the cities of Algona and Pacific to the south, the West Hill Sewer Basin to the west, and the city of Kent to the north. 4.1.2 West Hill Sewer Basin The West Hill Sewer Basin is located on the West Hill above the valley floor. Flows from the West Hill Basin are conveyed to two King County trunk lines—the Auburn West Valley Interceptor and the Auburn Interceptor. One pump station, Peasley Ridge, serves a small area within the West Hill Sewer Basin. The West Hill Sewer Basin is bounded by the Valley Sewer Basin to the east, city of Algona to the south, LUD to the west, and city of Kent to the north. The western boundary of the West Hill Sewer Basin, which is also the western boundary of the service area, was established by interlocal agreements with LUD in 2004 and 2005 (see Appendix A). 1 Utility staff also maintain five sewer pump stations owned by and serving other City agencies (see Chapter 7). Chapter 4 City of Auburn Comprehensive Sewer Plan 4-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4.1.3 Lea Hill Sewer Basin The Lea Hill Sewer Basin is the portion of the city located to the east of the Green River. Sewer flows exit the basin into the Valley Sewer Basin by river crossings at the 8th Street Bridge or the Green River Siphon (see Section 4.2.4). There is a significant unsewered area in the north portion of the Lea Hill Sewer Basin. A portion of the city of Kent lies within this sewer basin, and is served by City sewer infrastructure, including the new Verdana Pump Station. The northwest area of the sewer basin is served by SCWSD and the City of Kent (see Figure 4-1). The north and east boundaries of the Lea Hill Sewer Basin are defined by a 2001 interlocal agreement with the City of Kent and by a 2006 interlocal agreement with the Soos Creek (see Appendix A). 4.1.4 Auburn Way South Sewer Basin The Auburn Way South Sewer Basin is located east of the Valley Sewer Basin along Auburn Way South on the Enumclaw Plateau. It is geographically bounded by State Route 18 to the north and the White River to the south. The southeast portion of the Auburn Way South Sewer Basin borders the MIT reservation sewer service area. The City and the Muckleshoot Utility District (MUD) jointly own a major trunk line that discharges to King County’s newly constructed Stuck River Trunk Line at the northwest edge of the sewer basin. 4.1.5 South Hill Sewer Basin The South Hill Sewer Basin is bounded by the White River to the north and east, city of Pacific to the west, and city of Sumner and Pierce County to the south. The western half of the South Hill Sewer Basin has been developed as a residential area. Although most of the major sewer infrastructure serving the residential area is already in place, several significant developments are currently being constructed. The eastern half (east of Kersey Way) of the sewer basin is currently developed as low- density rural area and is unsewered. Three pump stations (Area 19, Terrace View, and North Tapps) serve the southern extent of the sewer basin. All of the flow from the South Hill Sewer Basin is conveyed to King County’s Lakeland Hills Pump Station, from where it is pumped to King County’s Lakeland Hills Trunk sewer located in the Valley Sewer Basin. 4.2 Sanitary Sewer Facilities The following sections provide information regarding the City’s wastewater facilities. Locations of the pumping facilities, river crossings, King County trunk lines, and other key system elements are shown in Figure 4-2. Ownership of interceptor and collection system pipelines is indicated on the figure by line color. Figure 4-2 also shows the City’s potable water pumps, wells, and reservoirs. The City of Auburn draws its potable water from deep aquifer wells located throughout the city. While no sewage treatment facilities are located within the city, portions of the conveyance system are located in the vicinity of some of those wells. Most of the sewer lines are located more than the 100 feet from the wellheads as stipulated for new sewer works by Ecology’s Criteria for Sewage Works Design (CSWD) (G2-1.5.3), two wellheads are located less than 100 feet from existing sanitary sewers, as shown on Figure 4-2. xxx GreenRiver LakeTapps BigSoos Cre e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW Algona Pacific Sumner Kent Area of Bonney Lake served by Auburn Sewer System WhiteRiver Unincorporated King County textUnincorporated King County UnincorporatedPierce County text Area of Kent served by Auburn Sewer System COMPREHENSIVE SEWER PLAN March 2015 FIGURE 4-1SEWER SERVICE BASINS3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-1_AuburnSewer_SewerServiceArea 11x17.mxd King County Pierce County L E G E N D Sanitary Sewer Basins Auburn Way South Lea Hill South Hill Valley West Hill King County Collection System Major Roads Street Area of Bonney Lake served by AuburnOther Sewer Utilities within City of Auburn City of Algona Soos Creek Water and Sewer District City of Kent Lakehaven Utility District Auburn City Boundary County line Water Streams Streets Political Boundaries M StreetTrunk Sewer Auburn Interceptor Auburn West ValleyInterceptor Auburn WestInterceptor Sewer Stuck RiverTrunk Sewer Lakeland HillsTrunk Sewer West HillSewer Basin Lea HillSewer Basin Auburn Way SouthSewer Basin South Hill Sewer Basin Valley SewerBasin GreenRiver LakeTapps BigSoos C re e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW Algona Pacific Sumner Kent WhiteRiver 15TH ST SW PE R I M E T E R R D S W CL A Y S T N W Pacific Dogwood Verdana Safeway Area 19 R Street F Street Auburn 40 Riverside8th Street North Tapps 22nd Street Auburn Jail Terrace View Rainier RidgePeasley Ridge Lakeland Hills Valley Meadows Ellingson Road Issac Evans Park Auburn Golf Course Auburn Justice Center Auburn Valley Humane Society COMPREHENSIVE SEWER PLAN March 2015 FIGURE 4-2EXISTING WASTEWATERCONVEYANCE SYSTEM3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-2_ExistingWastewaterConveyanceSystem11x17.mxd King County Pierce County L E G E N D Auburn Sewers Bonney Lake Sewers King County Sewers Kent Sewers Lakehaven Sewers Auburn/MIT Joint Sewers MIT Sewers Private Sewers Auburn Pump Station King County Pump Station Private Pump Station Water Pump Stations Water Reservoirs Water Wells/Springs Potable Water Well Within 100 Feet of Sewers Major Roads Street Area of Bonney Lake served by AuburnOther Sewer Utilities within City of Auburn City of Algona Soos Creek Water and Sewer District City of Kent Lakehaven Utility District Auburn City Boundary County line Muckleshoot Indian Reservation Streams/Rivers/Ponds Political Boundaries West HillSewer Basin Lea HillSewer Basin Auburn Way SouthSewer Basin South Hill Sewer Basin Valley SewerBasin River Crossing River Crossing City of Auburn Sewer Comprehensive Plan Chapter 4 4-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4.2.1 Critical Infrastructure For planning purposes, the City considers all sewer pump stations, force mains, river crossings, and major trunk lines (pipes greater than or equal to 12 inches in diameter) to be critical infrastructure. Also, all gravity sewer lines serving the hospital, city hall, City maintenance facility, Justice Center, and fire stations are considered critical. These critical assets are shown in Figure 4-3. 4.2.2 Pump Stations Since preparation of the 2009 Comprehensive Sewer Plan, the City has constructed, replaced, or decommissioned several sewer pump stations. Recently constructed or replaced pump stations include Auburn 40 (new), Dogwood, Ellingson, and Verdana (new). Three decommissioned facilities include the D Street, Rainier Shadows, and White Mountain Trails pump stations. The City currently has 15 pump stations within its SSSA. The pump stations are listed in Table 4-1 along with their location and year of construction or most recent replacement. More detailed information regarding the pump stations is provided in Appendix C. Table 4-1. City of Auburn Sewer Pump Station Inventory Pump station Year constructed/replaced Cross streets Approximate address South Hill Sewer Basin Area 19 2006 Lake Tapps Pkwy. E & west of 72nd St. SE 800 71st Street SE North Tapps 2007 Lake Tapps Pkwy. SE & west of 176th Ave. E 2610 Lake Tapps Pkwy. SE Terrace View 2007 East Valley Hwy. E & north of Terrace View Dr. SE 6005 East Valley Highway Valley Sewer Basin Auburn 40 2010 42nd St NE & O Pl. NE 4159 O Pl. NE Ellingson 2011 41st St. SE, East of A St. SE 40 41st St. SE F Street 1980 F St. SE & 17th St. SE 1700 F St. SE R Street 1977 R St. NE & 6th St. NE 600 R St. NE Valley Meadows 1992 4th St. SE & V St. SE 2022 4th St. SE 8th Street 1974 J St. NE & 8th St. NE 900 8th St. NE 22nd Street 1967 22nd St. SE & Riverview Dr. 1950 22nd St. NE Auburn Way South Sewer Basin Dogwood 2010 Dogwood St. SE & 15th St. SE 1423 Dogwood St. SE West Hill Sewer Basin Peasley Ridge 2001 S. 320th St. & 53rd Ave. S 5225 S 320th St. Lea Hill Sewer Basin Rainier Ridge 1980 125th Pl. SE & south of SE 318th Way 31809 125th Pl. SE Riverside 1981 8th St. NE & 104th Ave. SE 31902 104th Ave. SE Verdana 2011 118th Ave SE & SE 296th Pl. 11807 SE 296th Place (Kent) Chapter 4 City of Auburn Comprehensive Sewer Plan 4-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4.2.3 Gravity and Force Main Collection System The City sewer collection system includes approximately 195 miles of gravity and 5 miles of force main pipe. The collection system consists primarily of polyvinyl chloride (PVC) or concrete pipe with a diameter of 8 inches. Older areas of the collection system consist of clay pipe, which the City has been replacing with other material when repairs are required. The City is continually updating its digital geographic and record-keeping systems to include pipeline information such as age, diameter, and installation date. Figure 4-4 provides a visual representation (by overall system percentage) of pipeline characteristics, including unknown and/or unrecorded data. The largest current data gap is the installation date of collection system facilities. As part of the City’s asset management efforts, City staff will verify collection system information during routine inspections. Additional conveyance facilities, primarily owned by King County, are also located within the Auburn SSSA. King County conveyance facilities are discussed in Section 4.3. 4.2.4 Side Sewer Laterals The Utility is responsible for the maintenance and repair of the portion of side sewer laterals within the right-of-way or public sewer easement. 4.2.5 River Crossings The City of Auburn collection system contains two crossings of the Green River. The crossings are located at the 8th Street NE bridge and near 26th Street NE, and are shown in Figure 4-2. Detailed descriptions of each river crossing are provided below. 4.2.5.1 Green River Crossing (via 8th Street NE) The first crossing of the Green River was constructed in 1965. The crossing consists of a cast-iron pipe mounted on the 8th Street NE bridge. Because the bridge is at a higher elevation than the bank on either side, the pipe does not have a positive downhill slope across the bridge and must rely on upstream pressure developed in the line as it comes down Lea Hill to force the flow across the bridge. For this reason, the pipe on the bridge and continuing up Lea Hill approximately 900 linear feet, is constructed of 14-inch-diameter cast-iron pressure pipe. At the bottom of the hill, just upstream of the bridge, a valve chamber houses a mechanically operated control valve. The valve was designed to remain closed until pressure, as caused by the upstream pipe filling, opens the valve, and releases the flow across the bridge. Flow within this sewer segment is sufficiently high to maintain continuous scouring flow along the flat portion of the pipeline. 4.2.5.2 Green River Crossing (via Inverted Siphon at 26th Street NE) The inverted siphon across the Green River near 26th Street NE was constructed in 1986 and includes parallel 8- and 12-inch-diameter siphon pipelines. The 8-inch-diameter siphon is typically in use. When increased flows occur, wastewater will be redirected to the 12-inch-diameter siphon. If needed, both siphons are capable of operating together. The siphon facility includes a flushing manhole, located in Isaac Evans Park. GreenRiver LakeTapps BigSoos C re e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW WhiteRiver CITY HALL AUBURN JUSTICE CENTER CITY MAINTENANCE FACILITY DOGWOOD VERDANA AREA 19 R STREET F STREET AUBURN 40 RIVERSIDE8TH STREET NORTH TAPPS 22ND STREET TERRACE VIEW RAINIER RIDGEPEASLEY RIDGE LAKELAND HILLS VALLEY MEADOWS ELLINGSON ROAD COMPREHENSIVE SEWER PLAN March 2015 FIGURE 4-3CRITICAL SEWERS3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-3_Critical Sewers11x17.mxd King County Pierce County River Crossing River Crossing L E G E N DCritical Facilities Critical Service Fire Station Hospital Pump Stations Critical Sewers County line King County Sewers Sewers Major Roads Street City of Auburn Sewer Service Area Streams/Rivers/Ponds City of Auburn Sewer Comprehensive Plan Chapter 4 4-11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Figure 4-4. City of Auburn collection system summary statistics 0.9% 1.6% 70.7% 10.2% 8.1% 8.5% Pipe Diameter UNKNOWN < 8 inches 8 inches 10 inches 12 inches > 12 inches NOT CURRENTLY COMPILED IN CMMS DATABASE 56.5% 1.5% 0.9% 3.1% 11.4% 19.5% 7.2% Pipe Installation Date UNKNOWN 1960s 1970s 1980s 1990s 2000s 2010s NOT CURRENTLY COMPILED IN CMMS DATABASE 13.5% 1.5% 8.7% 1.4% 1.7% 73.2% Pipe Material UNKNOWN CLAY CONCRETE DUCTILE IRON HDPE PVC NOT CURRENTLY COMPILED IN CMMS DATABASE Chapter 4 City of Auburn Comprehensive Sewer Plan 4-12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4.3 King County Conveyance The King County wastewater conveyance facilities serving the City include the Auburn Interceptor, Auburn West Valley Interceptor, Auburn West Interceptor, M Street Trunk sewer, the newly constructed Stuck River Trunk sewer, the Lakeland Hills Trunk sewer, and the Lakeland Hills Pump Station. As shown on Figure 4-2, the King County facilities convey wastewater from the south to the north, collecting flow from the Auburn SSSA. The Auburn West Valley Interceptor begins in Algona and flows through the West Hills sewer basin. The Lakeland Hills Trunk sewer and Auburn West Interceptor carries flow from the Lakeland Hills Pump Station north. The M Street Trunk sewer lies mainly on the eastern side of the Valley basin. The Stuck River Trunk sewer extends from the south end of the M Street Trunk sewer in a westerly direction, where it intersects the Lakeland Hills Trunk sewer. All flows are conveyed to the King County South Treatment Plant in Renton, Washington. King County recently proposed several modifications to its conveyance system, to be completed in two phases, to address projected capacity limitations. Phase A consisted of constructing a new sewer, called the Stuck River Trunk sewer, to convey wastewater flow from the south end of the existing M Street Trunk sewer and route it west to the Lakeland Hills Trunk sewer. Phase A construction was completed in 2013. Phase B is currently under design and is planned for completion in 2016. Phase B consists of constructing a new sewer, called the Auburn West Interceptor Parallel, which will run parallel to the existing King County Auburn West Interceptor sewer. This pipe will run north from the intersection of Perimeter Road and 15th Street SW, cross under State Route 18, and connect to the existing Auburn West Interceptor at West Main Street and Clay Street in Auburn. Phase B also includes a new pipeline to carry wastewater north from the city of Pacific to Auburn. The sewer will run from King County’s Pacific Pump Station to the new Auburn West Interceptor Parallel. 4.4 Infiltration and Inflow King County has been conducting studies of existing I/I conditions in various local sewer agencies, including the city of Auburn, since 2000 as part of a Regional I/I Control program within the overall RWSP. The studies (see www.kingcounty.gov/environment/wastewater/II/Resources/Reports.aspx) include flow monitoring, modeling, construction of pilot I/I reduction projects, and follow-up analyses to determine the cost-effectiveness of various approaches. As a result of the study findings, King County plans to undertake several I/I reduction projects; however, no capital projects are currently planned for construction in Auburn. The I/I within the City’s SSSA was assessed as part of the modeling for the RWSP. The simulated I/I flows for some model basins exceeded the 1,100 gallons per acre day (gpad) King County standard2, as discussed in Chapter 5. The City will address I/I through the evaluation of its construction standards, annual repair and replacement (R&R) projects, and the development of projects to address large sources of I/I identified by maintenance staff. Furthermore, the City will include a project as part of the CIP (see Chapters 6 and 9) that will monitor flows within the collection system over the next 5 years. The data collected will be used for future system capacity modeling and I/I assessment. 4.5 Industrial Waste Discharges As part of its conveyance service, the City accepts industrial waste from permitted industrial waste dischargers. King County staff manage the industrial waste program, including permitting, 2 King County Code (KCC), Section 28.84.050 City of Auburn Sewer Comprehensive Plan Chapter 4 4-13 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx inspection, record-keeping, and enforcement. At present, the City does not project future industrial expansion; however, a policy is in place to collaborate with King County regarding permitting processes if expansion should occur. Table 4-2 below identifies the current industrial waste dischargers within the City SSSA. Table 4-2. City of Auburn Industrial Waste Discharge Permits Company name Business type Address Permit type Accurate Industries Metal Finishing: CFR 433 233 D Street NW Permit Aero Controls, Inc. Metal Finishing: CFR 433 1610 20th Street NW Minor Discharge Authorization American Powder Coating Metal Fabrication 3802 B Street NW Letter of Authorization Auburn Dairy Products Food Processing: Dairy 702 West Main Street Major Discharge Authorization Auburn Foreign Car, Inc. Vehicle Washing 725 Auburn Way North Letter of Authorization Auburn, City of: Decant Facility Decant Station 1305 C Street SW Major Discharge Authorization Auburn, City of: Sidewalk Cleaning Operation Pressure Washing Letter of Authorization Black Oxide, LLC Metal Finishing: CFR 433 131 30th Street NE, Suite 25 Permit Boeing Commercial Airplane: Auburn Metal Finishing: CFR 433 700 15th Street SW Permit ChemStation General Type 3104 C Street NE, Suite 202 Letter of Authorization Eco-Pan Inc. Trucked Waste 12573 SE Green Valley Road Major Discharge Authorization Formula Corp.: Auburn General Type 4432 C Street NE Major Discharge Authorization Hexacomb Corp. General Type 2820 B Street NW, Suite 111 Letter of Authorization Oldcastle Precast Cement/Readymix 2808 A Street SE Major Discharge Authorization Ply Gem Pacific Windows Corporation Manufacturing: Misc 5001 D Street NW Minor Discharge Authorization Safeway, Inc.: Auburn Distribution Center Vehicle Washing 3520 Pacific Avenue South Letter of Authorization Skills, Inc.: Auburn Facility Metal Finishing: CFR 433 715 30th Street NE Permit System Three Resins, Inc. Paint Manufacturing 3500 West Valley North, Suite 105 Letter of Authorization TMX Aerospace General Type 5002 D Street NW, Suite 104 Major Discharge Authorization Tri-Way Industries, Inc. (Auburn) Metal Finishing: CFR 433 506 44th Street NW Permit Valley Centre Groundwater Remediation: Metals 2820 B Street NW Verbal Waste Management Container Washing 701 2nd Street NW Minor Discharge Authorization City maintenance staff manage commercial dischargers in accordance with ACC Chapter 13.22. Maintenance activities related to commercial pretreatment facilities, specifically the City’s Fats, Oils, and Grease (FOG) Reduction Program, are discussed in Section 7.3. 4.6 Water Reclamation and Reuse Reclaimed water is wastewater that has been treated to a level at which it can be used safely and effectively for beneficial, non-drinking water purposes. The City does not currently use reclaimed water because there are no nearby sources or transmission pipelines for reclaimed water, and there are no users within the SSSA with significant volume needs that would drive implementation of reuse projects. Chapter 4 City of Auburn Comprehensive Sewer Plan 4-14 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx This section summarizes the regulatory framework surrounding the generation and use of reclaimed water, potential reclaimed water sources and users, and City planning for near-term reclaimed water use within the City SSSA. 4.6.1 Regulatory Framework The state has identified reclaimed water as an important water resource management strategy that can offer benefits related to potable water supply, wastewater management, and environmental enhancement. State law supports the beneficial reuse of reclaimed water for consumptive applications (such as irrigation, commercial and industrial process use, etc.) and non-consumptive purposes (including groundwater recharge via surface percolation or direct injection, wetland enhancement, and stream flow augmentation). DOH and Ecology have developed standards that guide the planning and development of reclaimed water projects and systems. These standards, summarized in the jointly published Water Reclamation and Reuse Standards (September 1997), describe the allowable beneficial uses of reclaimed water and the required levels of treatment appropriate for each use. The Standards establish four classes of reclaimed water; A, B, C, and D. Class A reclaimed water represents the highest level of treatment, referring to water that is oxidized, coagulated, filtered, and disinfected to certain standards. Of all levels of reclaimed water, Class A is acceptable for the widest range of uses. Additional clarification and guidance related to the design of reclaimed water facilities are provided in Ecology’s CWSD (Ecology, 2008). Ecology prepared draft reclaimed water regulations (WAC 173-219) to further define and provide guidance for reclaimed water facilities and uses. The rule-making process began with legislation in 2006 that amended the Reclaimed Water Use Act, Revised Code of Washington (RCW) Chapter 90.46, and directed Ecology to coordinate with DOH, form a stakeholder Rule Advisory Committee, and adopt a comprehensive rule for reclaimed water use by December 2010. The overall goal was to develop a Reclaimed Water Program through rule, guidance, and statute that runs smoothly and consistently while protecting public health and the environment. Several drafts of the proposed rule were made available for review by stakeholders, and significant comments were submitted, but the rule-making process was suspended by executive order before it could be completed. Ecology has recently announced that the rule-making process has been re-initiated with intended completion in late 2016. 4.6.2 Potential Reclaimed Water Sources This section identifies potential sources of reclaimed water in the vicinity of the City SSSA. 4.6.2.1 King County City of Auburn wastewater is treated at King County’s South Treatment Plant, located in Renton, approximately 13 miles north of Auburn. Although South Plant does generate reclaimed water for onsite uses and nearby irrigation and habitat restoration, there are no existing or planned transmission lines south to the City of Auburn. The status of current King County reclaimed water comprehensive planning is discussed in Section 4.6.3. 4.6.2.2 City of Sumner The City of Sumner wastewater treatment plant is located approximately 8 miles south of the city of Auburn. Sumner does not currently produce reclaimed water for offsite uses, but the City will continue to monitor Sumner’s plans for reclaimed water use to determine if transmission of reclaimed water from Sumner to the City of Auburn is feasible and cost-effective for potential users within the City of Auburn SSSA. City of Auburn Sewer Comprehensive Plan Chapter 4 4-15 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 4.6.2.3 Lakehaven Utility District LUD owns and operates two wastewater treatment plants, the Lakota and Redondo facilities, located approximately 7 miles to the west and northwest of the city of Auburn. LUD does not currently produce reclaimed water, but has evaluated the feasibility of producing reclaimed water for landscape irrigation and groundwater recharge. Because the Redondo facility site is limited with respect to expansion area, reclaimed water improvements, if implemented, would likely occur at the Lakota facility. The City will continue to monitor LUD planning efforts with respect to reclaimed water production and reuse. 4.6.2.4 City of Auburn Although the City of Auburn does not operate a centralized wastewater treatment plant, a smaller, satellite reclaimed water production facility could feasibly be installed at one of the City’s pump stations. A satellite facility could be used to capture wastewater flows from a specific basin, and then generate reclaimed water for uses nearby. While a range of treatment approaches may be employed at a satellite facility, many utilities are implementing membrane bioreactor (MBR) technology in these types of applications, because of the small footprint required relative to other, more conventional forms of wastewater treatment. Solids generated at the satellite facility would be returned to the collection system and conveyed to King County’s South Treatment Plant. 4.6.3 Potential Reclaimed Water Users Starting in 2009, King County began development of a Reclaimed Water Comprehensive Plan to evaluate expansion of its existing reclaimed water program over a 30-year period. The City of Auburn has supported the County’s planning process by providing non-potable water use data by specific parcel. City staff and elected officials have also participated in reclaimed water workshops held at key points in the County planning process. Although the Reclaimed Water Comprehensive Plan is not complete, the County has identified and recommended policies to be further developed moving forward. The County recommends optimizing existing reclaimed water infrastructure and investments, with no further expansion of the reclaimed water program. Figure 4-5, from King County’s Reclaimed Water Comprehensive Plan, presents the location of potential reclaimed water users within Auburn city limits, color-coded by use. Most identified uses of large volumes of water are for irrigation, which is seasonal use (approximately 4 months per year. The industrial/commercial uses identified could use reclaimed water throughout the year, but none of the identified users are currently a high-volume water user. 4.6.4 Reclaimed Water Summary The City of Auburn is not planning any specific capital improvements related to producing and/or conveying reclaimed water for the following reasons: • King County sources of reclaimed water are unlikely to be developed for use within the City SSSA in the near term. • The City currently has adequate water supply and the need for offsetting potable water demands is low at this time. • The capital costs related to design, construction, and permitting of a reclaimed water production facility and conveyance system to serve identified uses is not justified by generally seasonal demand and absence of financial benefit. The City acknowledges the value that a reclaimed water program might offer in the future, especially if a nearby reclaimed water source with associated conveyance piping is extended to the City’s SSSA. The City will continue to monitor reclaimed water planning by nearby purveyors, the adequacy of the Chapter 4 City of Auburn Comprehensive Sewer Plan 4-16 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx City’s water rights to meet current and future potable water demand, and the industrial user base to evaluate whether reclaimed water is a feasible and economically viable alternative. City staff will also continue to participate in King County’s reclaimed water comprehensive planning process to promote the City’s interests in County policies, criteria, and implementation strategies. ! ! !! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!King County Pierce County ?¦ Aæ AÆ ?¦ Aã Aæ Aæ Auburn Super MallPIN: 2421049076 Auburn Game Farm ParkPIN: 2921059069 Carpinito FarmsPIN: 0000400001 0006800002 3122059019 Mosby Bros. Farm - AuburnPIN: 2121059145 2121059096 Game Farm Wilderness ParkPIN: 2921059069 Lucio BoscoloPIN: 3522049008 3522049014 3522049040 3522049103 Mt Baker MiddlePIN: 3021059031 Emerald DownsPIN: 1580600152 1221049003 1580600150 0121049020 1221049002 River Mobile Home ParkPIN: 0621059002 0621059001 0004200007 Hazelwood ES/Rainier MiddlePIN: 0921059123 Miles Sand & Gravel Co.PIN: 1921059002 1921059008 1921059010 1921059082 1921059044 1921059276 1921059277 BNSF RRPIN: 2421049006 2421049030 2421049033 2421049035 2421049037 Olympic MiddlePIN: 1921059192 Joseph SchulerPIN: 3622049003 3622049006 3622049010 Lea Hill ElementaryPIN: 0921059005 Cascade MiddlePIN: 5094400080 Issac Evans ParkPIN: 0721059032 BoeingPIN: 2521049105 2521049106 2521049107 2521049108 2521049113 2421049069 2421049089 2421049091 2421049092 Mountainview HighPIN: 0421059051 Les Grove ParkPIN: 1921059181 1921059182 Muckleshoot Reservation CemeteryPIN: 2021059047 2021059041 Ilalko ElementaryPIN: 3121059007 Insulate LLCPIN: 6649600040 Stewart ArdellaPIN: 3622049012 Roegner ParkPIN: 6655000024 6655000030 3021059325 3021059375 Auburndale ParkPIN: 0821059017 FAAPIN: 2021059030 Auburndale IIPIN: 7867000020 Mountain View CemeteryPIN: 1421049011 1421049017 1421049067 9262800341 9662800330 Auburn Golf CoursePIN: 0621059007 0621059004 0521059011 Gildo Rey ElementaryPIN: 3021059195 Pioneer ElementaryPIN: 1921059054 Auburn HighPIN: 1821059082 Meredith Hill ElementaryPIN: 0221049149 Arthur Jacobsen ElementaryPIN: 0421059057 0421059085 Dick Scobee ElementaryPIN: 0001000047 Green River Community CollegePIN: 0921059104 1621059047 1621059006 1621059003 1621059008 1621059026 Evergreen Heights ElementaryPIN: 1121049022 Fulmer FieldPIN: 2648000010 Chinook ElementaryPIN: 2121059038 2121059092 West Auburn HighPIN: 4463400005 Enrique & Clarita Santos JrPIN: 3522049015 Cameron ParkPIN: 1313500310 7th Day Adventist HQPIN: 2721059012 2721059009 2721059072 2721059007 2721059043 2721059021 2721059081 2721059005 2721059006 Cedar Lanes ParkPIN: 3021059044 3021059089 3021049052 3021059080 Universal Brass Inc.PIN: 0004000040 Scootie Brown ParkPIN: 1821059101 Terminal ParkPIN: 8581400530 Kennedy EndeavorsPIN: 0303510090 Pioneer CemeteryPIN: 0721059020 American Powder CoatingPIN: 8855500040 Mary Olson Farm ParkPIN: 0521059006 3222059031 3222059032 Lea Hill ParkPIN: 0921059020 Green Valley AssociatesPIN: 2121059160 2121059010 Holy Family ElementaryPIN: 1921059018 1921059290 1921059201 1921059258 GSA Ballfield ParkPIN: 2421049075 2421049077 Auburn Riverside HighPIN: 6655000020 6655000026 Veterans Memorial ParkPIN: 1821059327 Terminal Park ElementaryPIN: 1921059053 Brannan ParkPIN: 7338001230 0001000081 Muckleshoot CasinoPIN: 2021059001 2021059021 2021059046 Washington ElementaryPIN: 1821059060 Thomas AcademyPIN: 9360000135 9360000140 9360000146 Auburn Regional Medical CenterPIN: 0492500240 Luisito & Lucita CuaresmaPIN: 3522049042 Rotary Park - AuburnPIN: 2597500910 2921059045 Neely FarmPIN: 2121059083 2121059007 East Auburn Athletic FieldsPIN: 0421059060 0421059061 0421059062 0421059071 0421059004 Auburn AcademyPIN: 2721059038 2721059039 2721059011 2721059033 2721059094 2721059067 2721059042 2721059052 2721059014 Indian Tom ParkPIN: 1821059001 North Green River ParkPIN: 0521059119 3022059105 3022059054 3122059011 3222059113 0004200017 0004200016 − October 2008 2,00002,0001,000 Feet Major Road !!!County Boundary KC-WTD Sewer KC-WTD Service Area Auburn City Limits Open Water Potential RW Users Agriculture Cemetery Commercial Golf Industrial Irrigation Lg Scale Res Irr Nursery/Grnhouse Park School Sports Facility Potential Reclaimed Water Users Within Auburn City Limits The information included on this map has been compiled from a variety of sources and issubject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of suchinformation. This document is not intended for use as a survey product. King County shallnot be liable for any general, special, indirect, incidential, or consequential damages including,but not limited to, lost revenues or lost profits resulting from the use or misue of the information contained on this map. Any sale of this map or information on this map is prohibited except bywritten permission of King County. File Name: Q:\\WTD\Projects\BW_Reuse\Projects\auburn_users.mxd - Shari Cross Data Source: King County 5-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 5 Wastewater System Analysis This chapter describes the analyses completed as part of this Plan, in support of CIP development. The specific analyses include hydraulic modeling of the City’s sewer conveyance system, assessing I/I, identifying sewer extensions needed to provide service to the entire city, and developing system requirements for incorporating an asset management tool into the City’s computerized maintenance management system (CMMS). These analyses are described in more detail below. 5.1 Hydraulic Capacity Analysis The purpose for updating the hydraulic model of the City’s sewer system was to incorporate facilities constructed since the model was originally built, recalibrate the model with new King County flow meter data, and provide an assessment of system capacities for current and projected wastewater flows. The capacity assessment provides the basis for identifying improvements that may be necessary for the Utility to achieve the adopted LOS discussed in Chapter 3. The capacity assessment is summarized below and presented in more detail as Appendix B. 5.1.1 Hydrologic and Hydraulic Model The hydraulic capacity analysis was completed using an H&H model of the City’s collection and conveyance system. The City provided an existing model using the DHI MIKE URBAN modeling platform for this analysis. The model was updated with those major sewer facilities not already included. In addition, sewered areas and population were updated in the model using data provided by the City, including GIS data, Puget Sound Regional Council (PSRC) population projections, and updated zoning/land use planning. The updated model was used to simulate base and wet weather wastewater flow for current and projected (i.e., 20-year planning period) scenarios. The projected scenario incorporated estimated future population and sewer area expansion. While future water conservation efforts may reduce the overall volume of sewage discharged to the system, the effect of the efforts on the ability of the system to convey wastewater is assumed insignificant and not incorporated in the modeling. The simulated wet weather flow has a recurrence interval of 20 years, which is the LOS defined for wastewater collection and conveyance (see Section 3). The model hydrology was calibrated using data from the King County Decennial Flow Monitoring Project, which is part of the County’s Conveyance System Improvement (CSI) program. There were 15 County flow monitoring locations in the Auburn system. King County also provided the calibrated models of their system near Auburn. The resolution (number of flow meters used for the service area) of these calibrated models was less than the City desired, but the County’s models provided a useful starting point for calibrating the City’s model. 5.1.2 Assessment Criteria The ratio of simulated depth to pipe diameter (d/D) for the 20-year flow was used to determine the adequacy of existing and future conveyance system capacity. In an unpressurized pipe, or a pipe with open-channel flow characteristics, the hydraulic grade line (HGL) is the elevation of the water surface within the pipe, or the d value. In a pipe that is surcharged (pressurized flow), the HGL is defined by Chapter 5 City of Auburn Comprehensive Sewer Plan 5-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx the elevation to which water would rise in an open pipe, or manhole, as shown in Figure 5-1. In hydraulic terms, the HGL is equal to the pressure head measured above the invert of the pipe. Figure 5-1. HGL for surcharged condition Pipes that surcharge frequently do not meet the LOS and should be upsized (or the tributary I/I reduced). Additionally, surcharging can reduce pipe lifespan and cause unexpected failures. If the surcharge depth is significant, then there is a risk of sanitary sewer overflows (SSOs) or sewers backing up into basements. Therefore, the freeboard, defined as the distance between the water surface in the manhole and the ground surface, should be considered when assessing conveyance system capacity. The amount of freeboard (distance between HGL and ground surface) for the upstream manhole, in each surcharging pipe, is included in the model output table in Appendix B. The approach for determining which pipes need to be upsized (to provide additional capacity) was based on the amount of surcharging. If a surcharged (d/D > 1) pipe was less than 6 feet below the ground surface, as simulated for the 1-in-20-year evaluation storm event, then the pipe was identified as requiring an upsize (or capacity reclaimed through reduction of I/I). The depth of 6 feet was selected because this is considered low enough beneath the ground surface to avoid back up of sewer flow in basements. This criterion was evaluated for both existing and future (2020) conditions. As flows increase in the future, City staff will need to monitor water surface elevations during large storm events throughout the system to determine when pipes should be upsized. If the observed surcharging increases to the point of risking property or becoming an SSO, then the pipe or pipes should be upsized (or I/I reduction sought). This approach will help to provide confidence that the City has adequate capacity for conveying the design flows without spending more capital dollars than necessary. 5.1.3 Existing-Conditions Evaluation The existing-conditions scenario represents the existing conveyance system under current flow conditions during the 20-year wet weather event. The results of this analysis identify any hydraulic deficiencies currently within the system. Based on discussions with City staff, the model predictions generally support their observations of no current capacity problems. Highlights of the modeling results are discussed below. The detailed results (i.e., modeled sewer statistics) for the current (existing) conditions planning scenario are shown in Appendix B. D d City of Auburn Comprehensive Sewer Plan Chapter 5 5-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 5.1.3.1 Gravity Sewers The existing-conditions modeling revealed surcharging throughout the conveyance system with more than 100 sewer pipes showing mostly minor surcharging. Surcharged sewers include all City-owned pipes with a modeled d/D ratio of greater than 1.0. In addition, flooding to the ground surface (i.e., SSO) was predicted at a single location, along Boundary Boulevard SW on the southwestern limits of the city. The location of the SSO and surcharged sewer pipes are shown on Figure 5-2, and listed in Appendix B. The freeboard, predicted by the model, for those pipes with surcharge, is provided in Appendix B. The location predicted to have a SSO by the model is adjacent to King County’s Auburn West Valley Interceptor. King County is currently planning to change the discharge location of the upstream Pacific Pumping Station from this interceptor to the Auburn West Interceptor. This change will reduce the hydraulic grade line downstream of the predicted SSO in the City, which would have a positive effect. In addition, the simulated SSO is not corroborated by City observations. Therefore, no capital project is proposed for this location. A majority of the identified surcharging sewer pipes are adjacent to King County sewer pipes. The surcharging at these locations is due mostly to the hydraulic grade line in the County’s sewer pipes, and not because of insufficient capacity in the City’s sewer pipes. None of these locations had surcharge within 6 feet of the ground surface. However, the City should observe these locations during wet weather in the event the surcharging increases. If chronic surcharging near the ground surface is observed, then King County should be notified. King County addresses capacity issues of its assets with its Conveyance System Improvements (CSI) program. Surcharging in the remaining (City) sewer pipes was minor. The surcharge in each sewer pipe was more than 6 feet below the ground surface. Therefore, no capital projects are proposed to address capacity in the City’s conveyance system. Sewer pipes simulated to surcharge should be observed during wet weather events to determine if, and when, improvements may be required to prevent basement backups or SSOs. 5.1.3.2 Pump Stations and Force Mains Pumping station and force main flow statistics are listed in Table 5-1. The locations of the stations are shown in Figure 5-2. The table shows the model estimates for inflows to the pumping stations. These flow values are compared to the stations rated flow capacity. The F-Street pumping station is the only location where the model estimated flow is higher than the rated capacity. The estimated capacity shortfall is relatively small, about 30 percent, and City staff reported no issues at this location. This model result should be further confirmed by frequent monitoring of pump run times (SCADA information), field observations of water levels in the wet well and upstream sewers during wet weather, or upstream flow monitoring as part of CIP project 9 (see Chapter 7). The table also shows the maximum force main velocity, based on the pumping station rated capacity. In general, the maximum velocity should not exceed 7 feet per second to avoid increased pump power consumption. The only pumping station with an excessive maximum velocity is Ellingson Road. Pump operating procedures at this pumping station should be evaluated in an effort to address the excessive force main velocity. However, because of the short length of the force main, approximately 50 feet, this is not a major concern. Chapter 5 City of Auburn Comprehensive Sewer Plan 5-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 5-1. Simulated 20-Year Flows to Pumping Stations, Existing Conditions Scenario Pumping stationa Current pumping rated capacityb, gallons per minute (gpm) No. of pumps Existing peak 20-year flow, gpm Force main size, inches Maximum force main velocityc, fps Area 19 325 2 22 6 3.7 Terrace View 675 2 21 8 4.3 Ellingson Road 1,527 2 1,054 8 9.7 F Street 400 2 528 8 2.6 Riverside 400 2 54 6 4.5 R Street 100 2 79 4 2.6 Peasley Ridge 275 2 31 6 3.1 Rainer Ridge 200 2 109 6 2.3 Valley Meadows 125 2 63 4 3.2 22nd Street 550 2 167 6 6.2 D Street 400 2 97 6 4.5 8th Street 150 2 9 4 3.8 North Tapps 510 2 55 8 3.3 Verdana 2,000 3 727 12 5.7 Dogwood 300 2 151 6 3.4 a. The Auburn 40 pump station was not modeled for the plan because it is relatively new and serves a small area in the city. b. The rated pumping capacity, or firm capacity, is based on pump station operation without the use of one (redundant) pump. Use of all the pumps at a pump station does not provide pumping redundancy as per U.S. EPA requirements. c. The maximum velocity based on firm pumping capacity. Velocities exceeding 7 feet per second (fps) are generally to be avoided. Velocities in excess of 7 fps result in significant increases in pump power consumption. 5.1.4 Future-Conditions Evaluation The results of the future-conditions scenario modeling are described in this section. This scenario represents the conveyance system with any known, future improvements, and estimated future flows during the 20-year wet weather event. Future flows for 2020 and 2034, based on projected growth in the city, were simulated. The detailed results (i.e., modeled sewers) for the future-conditions scenario are provided in Appendix B. 5.1.4.1 Gravity Sewers The future model incorporated King County’s planned improvement to the Pacific Pumping Station force main. As described above, this planned improvement will redirect current pump station discharge from King County’s West Valley Interceptor to the County’s West Interceptor. This change in discharge location eliminated the flooding predicted at Boundary Boulevard for existing conditions, for both 2020 and 2034 future conditions. There was no predicted flooding in the City’s conveyance system for the future conditions. The locations of surcharged sewer pipes for the 2020 and 2034 future conditions are shown on Figure 5-2 and listed in Appendix B. The remaining freeboard predicted by the model, for those pipes with surcharge, is provided in Appendix B. GreenRiver MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW WhiteRiver 15TH ST SW PER I M E T E R R D S W CL A Y S T N W King County Pierce County BOUNDARY BLVD SW Pacific Dogwood Verdana Safeway Area 19 R Street F Street Auburn 40 Riverside8th Street North Tapps 22nd Street Auburn Jail Terrace View Rainier RidgePeasley Ridge Lakeland Hills Valley Meadows Ellingson Road Issac Evans Park Auburn Golf Course Auburn Justice Center Auburn Valley Humane Society COMPREHENSIVE SEWER PLAN March 2015 FIGURE 5-2WASTEWATER MODELNETWORK AND RESULTS -EXISTING CONDITIONS, 20-YR FLOW 3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-2_ExistingWastewaterConveyanceSystem11x17.mxd L E G E N D Simulated surcharge Simulated flooding Model sewer pipe Auburn sewer King County sewer Auburn Pump Station King County Pump Station Private Pump Station Major Roads Street Auburn City Boundary County line Muckleshoot Indian Reservation Streams/Rivers/Ponds City of Auburn Comprehensive Sewer Plan Chapter 5 5-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx The future 2034 model results are shown mostly for reference. No capital projects are proposed based on these model results because the uncertainty associated with predictions this far in the future is very high. However, the 6-year planning horizon is more certain, and making decisions for this time period is necessary for sound management of the City’s sewer utility. Therefore, the discussion here will focus on the 2020 model results. There were about 125 sewer pipes predicted to surcharge for the future (2020) conditions, which was not significantly more than the existing-conditions evaluation. Similar to the existing-conditions scenario, many surcharged pipes were adjacent to King County pipes. These are not considered to be issues for the City, as described previously. The predicted surcharge in the remaining pipes was mostly minor with the hydraulic grade line being more than 6 feet beneath the ground surface. There were two locations where the surcharge was less than 6 feet below ground: upstream and downstream of the Verdana Pumping Station. Neither of these locations has a simulated water surface within 4 feet of the ground, so there is minimal risk of SSO, based on the model results. The surcharge upstream of the pumping station appears to be caused by relatively small (8-inch diameter) pipes (according to the City’s GIS) entering the station. This information should be field verified and water levels in the upstream sewer pipes monitored during wet weather prior to a capital project being developed. The surcharge downstream of the pumping station is also downstream of a flow diversion manhole installed during construction of the Verdana Pumping Station. This flow diversion potentially provides the City flexibility in operation to reduce the predicted surcharging by sending more flow away from the surcharging. Again, no capital project should be developed to address this surcharging until visual monitoring confirms excessive surcharge, and operational changes are deemed insufficient to address the surcharge. As a result of the future-conditions (2020) hydraulic analysis, no sewer pipe replacement capital projects are proposed. 5.1.4.2 Pump Stations and Force Mains Pumping station flow statistics are listed in Table 5-2. The locations of the stations are shown in Figure 5-3. Similar to the existing-conditions modeling, the F-Street Pumping Station is shown to have insufficient firm capacity. This pumping station is not currently recommended to be replaced, based on the same reasoning explained in the existing-conditions section. Future flow metering data, including data developed based on CIP project 9 (see Chapter 7), will help add fidelity to the hydraulic model and will shape future evaluations of the conveyance system. Chapter 5 City of Auburn Comprehensive Sewer Plan 5-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 5-2. Simulated 20-Year Flows to Pumping Stations, Future (2020) Conditions Scenarioa Pumping stationb Current pumping rated capacityc, gpm No. of pumps Existing peak 20-year flow, gpm Area 19 325 2 22 Terrace View 675 2 29 Ellingson Road 1,527 2 1,055 F Street 400 2 535 Riverside 400 2 63 R Street 100 2 82 Peasley Ridge 275 2 42 Rainer Ridge 200 2 116 Valley Meadows 125 2 71 22nd Street 550 2 175 D Street 400 2 102 8th Street 150 2 9 North Tapps 510 2 92 Verdana 2,000 3 953 Dogwood 300 2 154 a. The maximum force main velocity is not provided for future conditions because it is estimated based on the pumping stations firm capacity, and not modeled flows. So, the maximum force main velocities are the same for existing and future conditions. b. The Auburn 40 pump station was not modeled for the plan because it is relatively new and serves a small area in the city. c. The rated pumping capacity, or firm capacity, is based on pump station operation without the use of one (redundant) pump. Use of all the pumps at a pump station does not provide pumping redundancy as per U.S. EPA requirements. GreenRiver MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW WhiteRiver 15TH ST SW PER I M E T E R R D S W CL A Y S T N W King County Pierce County BOUNDARY BLVD SW Pacific Dogwood Verdana Safeway Area 19 R Street F Street Auburn 40 Riverside8th Street North Tapps 22nd Street Auburn Jail Terrace View Rainier RidgePeasley Ridge Lakeland Hills Valley Meadows Ellingson Road Issac Evans Park Auburn Golf Course Auburn Justice Center Auburn Valley Humane Society COMPREHENSIVE SEWER PLAN March 2015 FIGURE 5-3WASTEWATER MODELNETWORK AND RESULTS -FUTURE CONDITIONS, 20-YR FLOW 3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-2_ExistingWastewaterConveyanceSystem11x17.mxd L E G E N D 2020 simulated surcharge 2034 simulated surcharge Model sewer pipe Auburn sewer King County sewer Auburn Pump Station King County Pump Station Private Pump Station Major Roads Street Auburn City Boundary County line Muckleshoot Indian Reservation Streams/Rivers/Ponds City of Auburn Sewer Comprehensive Plan Chapter 5 5-11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 5.2 Inflow and Infiltration The current levels of I/I in the Auburn sewer system do not appear to be causing capacity-related issues. However, pipes will continue to degrade, allowing more infiltration into the system, and populations are expected to rise within the SSSA, both increasing flows to the sewer system. If I/I capacity-related issues occur in the future, then reducing the amount of I/I in the collection system can improve the hydraulic capacity of the system such that some pipes may not need to be replaced. In addition, I/I reduction can help to prevent some types of structural failures and reduce M&O requirements. It is recommended that Auburn complete an initial I/I investigation to augment currently available data and prepare a baseline that future studies can be compared against. This information will help to inform the decision when it is appropriate to fund and implement an actual I/I management program. The primary components of an I/I management program are shown in Figure 5-4. This figure depicts the necessary components to successfully manage the project (Program Charter), identify the issues (Problem Determination), identify proper corrections (Correction Implementation), evaluate the work completed (Effectiveness Evaluation), and set a long-range plan (Long-Range Planning). 5.2.1 Initial Inflow and Infiltration Assessment The King County flow monitoring included 15 flow meter basins that impact City of Auburn sewers. Two of these basins are located outside of Auburn’s purview: one is located in Algona and in the other basin, while within city limits, the sewers are owned and maintained by LUD. These basins were compared to each other and ranked based on high, medium, and low I/I based on the 25-year I/I rates normalized on inch-diameter/miles of the flow meter basin. The results of this are shown in Figure 5-5. The two basins located outside of Auburn’s control that were evaluated showed high levels of I/I. It is recommended that Auburn share the results of this evaluation with Algona and LUD. The U.S. Environmental Protection Agency (EPA) recognizes that many collection system SSOs are the result of high flows associated with wet weather events. Consequently, in some instances, language has been added to National Pollutant Discharge Elimination System (NPDES) permits requiring the permittee to take actions to reduce I/I within the sanitary collection system. To be proactive, it is recommended that Auburn further evaluate I/I rates with additional flow monitoring and data evaluation. Chapter 5 City of Auburn Comprehensive Sewer Plan 5-12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Figure 5-4. Primary components of an I/I management program GreenRiver LakeTapps BigSoos Cre e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW Algona Pacific Sumner Kent WhiteRiver 15TH ST SW PE R I M E T E R R D S W CL A Y S T N W Pierce County King County Pacific Dogwood Verdana Safeway Area 19 R Street F Street Auburn 40 Riverside8th Street North Tapps 22nd Street Auburn Jail Terrace View Rainier RidgePeasley Ridge Lakeland Hills Valley Meadows Ellingson Road Issac Evans Park Auburn Golf Course Auburn Justice Center Auburn Valley Humane Society COMPREHENSIVE SEWER PLAN March 2015 FIGURE 5-5INFLOW AND INFILTRATIONCOMPARATIVE LEVELS3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-2_ExistingWastewaterConveyanceSystem11x17.mxd L E G E N DI/I Level High Medium Low High/Not COA Flow Meter Locations Auburn Sewers Bonney Lake Sewers King County Sewers Kent Sewers Lakehaven Sewers MIT Sewers Private Sewers Auburn Pump Station King County Pump Station Major Roads StreetOther Sewer Utilities within City of Auburn City of Algona Soos Creek Water and Sewer District City of Kent Lakehaven Utility District Auburn City Boundary County line Streams/Rivers/Ponds Political Boundaries City of Auburn Sewer Comprehensive Plan Chapter 5 5-15 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 5.3 Sewer Extensions A City goal is to be able to serve every parcel within city limits with sanitary sewer service. Currently many areas within city limits are served by onsite systems (septic tanks) or are undeveloped. The City’s GIS information was used to lay out an extension plan and to determine where gravity service was feasible. This was accomplished by comparing inverts of the existing collection system, topography, assuming minimal allowable slopes of 0.5 percent, and the location of unserved parcels. In some locations, gravity service appears to be infeasible and pump stations are required to convey sewage to existing infrastructure. It is estimated that up to six new pump stations may be required to have citywide sewer service. While the pump stations were not individually sized, they would all be small in nature, generally less than 500 gpm. In addition, gravity service is not a viable option for about 64 parcels within city limits. These parcels will have to use mechanical means, such as individual grinder pumps, to be connected to the City’s system. The proposed conceptual sewer extension plan is shown on Figure 5-6. City wide, the plan estimates the need for the following capital improvements and, for planning-level construction cost estimates (in 2014 dollars), the following unit costs are recommended: • 261,250 feet of 8-inch-diameter gravity pipe: $500/foot • 8,650 feet of 4- to 8-inch-diameter force main: $400/foot • 6 pump stations: $500,000/each (assuming no property acquisition) • 64 non-gravity services (grinder pumps or equivalent): $10,000/each • 7,500 feet of 2-inch-diameter low-pressure force main: $250/foot The city was subdivided into concentrated groupings of proposed sewer extensions. Estimated construction costs for sewer extensions were calculated for each basin based on the number of assets within their area and the above unit costs. The results of this are shown in Figure 5-7. The total estimated construction cost to extend service to all parts of the city is estimated to be around $140 million. In general, such future extensions would be constructed by future development or by the properties benefiting from such extensions. PacificPUMP STATION DogwoodPUMP STATION VerdanaPUMP STATION SafewayPUMP STATION Area 19PUMP STATION R StreetPUMP STATION F StreetPUMP STATION Auburn 40PUMP STATION RiversidePUMP STATION8th StreetPUMP STATION North TappsPUMP STATION 22nd StreetPUMP STATION Auburn JailPUMP STATION Terrace ViewPUMP STATION Rainier RidgePUMP STATIONPeasley RidgePUMP STATION Lakeland HillsPUMP STATION Valley MeadowsPUMP STATION Ellingson RoadPUMP STATION Issac Evans ParkPUMP STATION Auburn Golf CoursePUMP STATION Auburn Justice CenterPUMP STATION Auburn Valley Humane SocietyPUMP STATION A S T S E B S T N W AU B U R N W A Y S M S T S E C S T S W SR 1 6 7 - S O U T H SR 1 6 7 - N O R T H I S T N E AU B U R N W A Y N R S T S E SR 18-EASTSR 18-WEST 12 4 T H A V E S E 132 N D A V E S E WE S T V A L L E Y H W Y N E MAIN ST SE 304TH ST S 277TH ST C S T N W C S T N E STUCK RIVER DR SE 15TH ST SW 2ND ST E W MAIN ST 15TH ST NW LAKE TAPPS PKWY SE 53RD ST SE 41ST ST SE 51 S T A V E S 29TH ST SE SE 312TH ST K E R S E Y W A Y S E M S T N W SE 320TH ST M S T N E SE 288TH ST 37TH ST SE 8TH ST NE 37TH ST NW SE 284TH ST 22ND ST NE LA K E L A N D H I L L S W A Y S E ORA V E T Z R D S E 17TH ST SE S 296TH ST 25TH ST SE 12TH ST SE PER I M E T E R R D S W 55T H A V E S R S T N E AC A D E M Y D R S E 110 T H A V E S E D S T S E D S T N W 104 T H A V E S E A S T N E PA C I F I C A V E S 4TH ST SE I S T N W 116 T H A V E S E A S T N W 11 8 T H A V E S E WES T V A L L E Y H W Y S LEA HILL R D S E SE 299TH ST GREE N R I V E R R D S E EM E R A L D D O W N S D R N W D S T N E N S T N E W S T N W E S T N E 37TH ST NE O S T N E 56 T H A V E S 69TH ST S E S 316TH ST S C E N I C D R S E S 287TH ST H S T N W 44TH ST NW 62ND ST SE S 300TH PL SR 1 6 7 - S O U T H R A M P 14TH ST NE CL A Y S T N W SE 316TH ST AUBURN-BLACK DIAMOND RD SE SR 1 6 7 - N O R T H R A M P SR 18-EAST RAMP 11 2 T H A V E S E RIVERWALK DR SE 144 T H A V E S E EVERGREEN WAY SE EA S T V A L L E Y H W Y E 4TH ST NE 4 6 T H P L S MO N T E V I S T A D R S E K S T S E 4TH ST SW H A R V E Y R D N E BR I D G E T A V E S E 7TH ST SE S 331ST ST 5TH ST SE I S T S E EA S T B L V D ( B O E I N G ) DO G W O O D S T S E FR O N T A G E R D 67TH ST SE L S T S E PIK E S T N E 8TH ST SE T S T S E F S T S E MIL L P O N D D R S E 14 0 T H A V E S E C S T S E FO S T E R A V E S E H S T S E 52N D A V E S G S T S E 10 5 T H P L S E 32ND ST NE B S T S E SE 316TH PL E S T S E SE 310TH ST 15TH ST NE G P L S E 47TH ST SE 56TH ST SE RIVER D R S E SE 296TH WAY 54 T H A V E S A S T S W S 305TH ST 57TH P L S SE 290TH ST U S T N W PEASLEY CANYON RD S QU I N C Y A V E S E 12 7 T H P L S E 130 T H A V E S E 28TH ST NE 35TH WAY SE BOUNDARY BLVD SW 30TH ST NE EL I Z A B E T H A V E S E R ST N W OLI V E A V E S E 65 T H A V E S 51ST ST NE RIV E R V I E W D R N E 26TH ST SE SE 323RD PL S 300TH ST O S T S W B S T N E H O W A R D R D S E SE 301ST ST 29TH ST NW SE 287TH ST 32ND ST SE 36TH ST SE 10TH ST NE 64TH ST SE 50T H S T S E 108 T H A V E S E 3RD ST SE V S T N W 21ST ST NE A ST E HE M L O C K S T S E 31ST ST SE 2ND ST NW FOREST R I D G E D R S E 85 T H A V E S 30TH ST SE S 318TH ST SE 298TH PL 24TH ST SE 23RD ST SE22ND ST SE H S T N E 64 T H A V E S PIK E S T N W SR 18-W E S T R A M P 42ND ST NW G S T N E 58T H A V E S 16TH ST NE 17TH ST NE S 288TH ST 111 T H P L S E 24TH ST NE SE 282ND ST LU N D R D S W 19TH DR NE 126 T H A V E S E 49TH ST NE 10 2 N D A V E S E TE R R A C E D R N W ELLINGSON RD SW SKYWAY LN S E HI C R E S T D R N W O S T S E 10TH ST SE D S T S W 176 T H A V E E SE 32 6 T H P L SE 295TH ST 20TH ST SE SE 286TH ST V S T S E 66TH ST SE 14 8 T H A V E S E F S T S W V C T S E 24TH ST NW 12 8 T H P L S E 72ND ST SE 16TH ST SE S 312TH ST 6TH ST NW 42ND ST NE 13TH ST SE B PL NW 3RD ST NW SE 3 1 2 T H W A Y 2ND ST SE SE 294TH ST Z S T S E 73RD ST SE 55 T H P L S S 292ND ST EL M S T S E ELM LN SE PE A R L A V E S E 105 T H A V E S E L S T N E SE 285TH ST 52 N D P L S 9TH ST SE 67T H L N S E OUTLET COLLECTION WAY SW SE 307TH PL IS A A C A V E S E HA Z E L A V E S E 28TH ST SE 11TH ST NE T S T N E 15TH ST SE SE 42ND ST 26TH ST NE SE 299TH PL 45TH S T N E J S T N E S 303RD PL SE 308TH PL SE 281ST ST SE 290TH PL HE A T H E R A V E S E 109 T H P L S E RA N D A L L A V E S E MAPLE DR SE S 314TH S T 6TH ST SE K S T N E 30TH ST NW NO B L E C T S E U S T S E SE 289TH ST 19TH ST SE SE 297TH ST 57 T H D R S E WAR D A V E S E 12 9 T H P L S E I P L N E 21ST ST SE SE 307TH ST 33RD ST SE 55TH ST SE S 324TH ST SE 323RD ST 14TH ST NW WE S T E R N A V E N W 11 7 T H P L S E PIK E S T S E N S T S E SE 292ND ST OL Y M P I C S T S E 112 T H P L S E 42ND PL NE SE 296TH ST PARK AVE NE SE 306TH ST 13 4 T H P L S E D P L S E 11 0 T H P L S E 5TH ST NE M DR NE 35TH ST NE F S T N E 8TH ST SW SE 302ND PL U C T N W KA T H E R I N E A V E S E 40TH ST NE 59T H A V E S SE 300TH ST 16TH ST NW JA S M I N E A V E S E 133 R D A V E S E 9TH S T N E 63R D P L S 2ND ST NE 27TH ST SE 6TH ST NE CROSS S T S E 10 7 T H A V E S E O C T S E JA M E S A V E S E SE 305TH PL S 307TH ST UD A L L A V E S E SE 288TH PL KE N N E D Y A V E S E SE 314TH PL 56T H P L S SE 313TH ST V PL SE SE 302ND ST S 297TH PL SE 318T H P L 12 1 S T P L S E 56 T H C T S 26TH ST NW SE 293RD ST 37 T H P L S E 12 5 T H A V E S E 11 3 T H P L S E 120 T H A V E S E SE 304TH PL S 329TH PL S 292ND PL 71ST ST SE SE 315TH ST S 328TH ST 49TH ST SE S 321ST ST 60 T H P L S SE 321ST PL 67TH C T S E SE 282ND WAY FR A N K L I N A V E S E 7TH ST NE 124 T H P L S E S S T S E SE 322ND PL 3RD CT SE 138 T H A V E S E S 298TH PL S 326TH LN 44TH ST SE L P L N E SE 319TH ST SE 325TH PL SE 315TH PL 181 S T A V E E 10 0 T H A V E S E WE S L E Y P L S E SE 306TH PL SE 305TH ST 23RD ST NE 123 R D A V E S E 17 1 S T A V E E U S T N E POP L A R S T S E JO R D A N A V E S E SE 306TH CT 53RD A V E S S 294TH PL O C T N E SE 283RD ST 59 T H P L S L C T N E W PL NW EV E R G R E E N W A Y S E PIK E S T N E 30TH ST NE 37TH ST SE SE 288TH PL 57 T H P L S 25TH ST SE 12 1 S T P L S E F S T S E D S T S E D S T S E SE 282ND ST C S T S E L S T S E 36TH S T S E L S T S E N S T S E 116 T H A V E S E 29TH ST NW 8TH ST NE K S T S E 55T H A V E S SE 295TH ST J S T N E R S T N E K S T N E D S T S E ELM S T S E PIK E S T S E SR 18-WEST RA M P H S T S E 72ND ST SE D S T N E SE 286TH ST B S T N W SE 290TH PL SR 18-EAST RA M P H S T N E L S T N E 56 T H A V E S SE 294TH ST 112 T H A V E S E SE 288TH ST 23RD ST SE E S T S E 108 T H A V E S E I S T S E 10 8 T H A V E S E EL I Z A B E T H A V E S E O S T N E A S T S E N ST N E 108 T H A V E S E 11 2 T H A V E S E O S T N E SE 315TH PL 2ND ST SE 4TH ST NE SE 295TH ST D S T S E SE 310TH ST 51S T A V E S R S T N W SE 302ND ST L E G E N D Proposed Sewers Proposed Gravity Proposed LPFM Proposed Force Main Proposed Pump Station Ex. COA Pump Station Ex. King County Pump Station Ex. Other Pump StationKing County Sewers Force Main Gravity MainAuburn Sewers Force Main Gravity Main Private Force Main Private Gravity Main City of Auburn Sewer Service Area County line Buildings Paved Surfaces Water Bodies Wetlands Parcels Steep Slopes FIGURE 5 - 6 CITY OF AUBURN COMPREHENSIVE SEWER PLAN EXISTING AND PROPOSED SEWER FACILITIES 1,000 0 1,000 2,000Feet P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_5-2_SewerExtensions.mxd 1 inch = 1,000 feet March 2015 N King CountyPierce County SR 1 6 7 SR 1 8 A S T S E AU B U R N W A Y S C S T S W B S T N W AU B U R N W A Y N I S T N E 13 2 N D A V E S E WE S T V A L L E Y H W Y N W M S T S E 51 S T A V E S 8TH ST E 12 4 T H A V E S E 24TH ST E BU T T E A V E 15TH ST SW 12 2 N D A V E E 2ND ST E SE 312TH ST S 277TH ST C S T N E C S T N W 198TH A V E E AUB U R N - B L A C K D I A M O N D R D S E 53RD ST SE 9TH ST E G R E E N R I V E R R D WE S T V A L L E Y H W Y S W EDWARDS RD E 41ST S T S E STUCK R I V E R D R SE 288TH ST EA S T V A L L E Y H W Y S E 16TH ST E KE R S E Y W A Y S E SE 304TH ST 12TH ST E1 9 0 T H A V E E M S T N E PER I M E T E R R D 8TH ST NE SE 272ND ST 37TH ST NW ACADEMY D R S E SE LAKE HOLM RD GREEN VALLEY RD ORA V E T Z R D S E VA L E N T I N E A V E S E SE 282ND ST 14 7 T H A V E S E 14 4 T H A V E S E 17TH ST SE 55 T H A V E S 1ST AVE SE 18 5 T H A V E E D S T N W A S T N E JOV I T A B L V D EA S T B L V D ( B O E I N G ) 10 8 T H A V E T A C O M A P O I N T D R E 14 8 T H A V E S E EM E R A L D D O W N S D R N W D S T N E M S T N W 169T H A V E E S 287TH ST S C E N I C D R S E S 316TH ST WE S T B L V D ( B O E I N G ) H S T N W 44TH ST NW 14 8 T H A V E E 13 7 T H A V E E SE G R E E N V A L L E Y R D TH O R T O N A V E S W SE 310TH ST LEA HILL R D S E 17TH ST E 11 8 T H A V E S E S 3RD AVE S 36 4 T H P L S 384TH ST ROY RD SW J S T N E 12 6 T H A V E E S 2 7 2 N D W A Y BR I D G E T A V E S E MO N T E V I S T A D R S E L S T S E CO T T A G E R D E FO S T E R A V E S E F S T S E 1ST ST E G S T S E NO R M A N A V E S E SE 284TH ST H O W A R D R D I S T N W 14 2 N D A V E E 78 T H A V E S 13 5 T H A V E S E 3RD ST E 86 T H A V E S 27TH ST E R S T N W 85 T H A V E S K S T S E S 336TH ST C S T S E SE 301ST ST SE 287TH ST 2 0 0 T H A V E E QU I N C Y A V E S E 29TH ST NW MIL W A U K E E A V E N 56 T H A V E S SKYWAY LN S E 32ND PL NE 2 1 1 T H A V E E 45TH ST N E 7TH ST E 14 0 T H A V E S E 10 5 T H A V E S E U C T N W SE 270TH PL SE 273RD PL SE 300TH ST SR 1 6 7 11 8 T H A V E S E 51 S T A V E S SR 1 6 7 SR 1 6 7 SR 18 SE 284TH ST SR 18 12 4 T H A V E S E SR 1 6 7 SE 272ND ST 14 4 T H A V E S E S R 1 6 7 S 277TH ST 14 2 15 9 1 5 16 19 8 18 3 4 13 2524 17 6 10 22 21 7 11 20 23 12 COMPREHENSIVE SEWER PLAN March 2015 L E G E N D Proposed Gravity Extension Proposed LPFM Extension Proposed Force Main Extension Proposed Pump Station Existing Pump Stations King County Sewers Existing Sewers Major Roads Street County Line Streams Water Parcels City of Auburn Sewer Service Area P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_5-7_SewerExtensionsCosts.mxd FIGURE 5-7SEWER EXTENSIONFOR UNSEWERED AREASESTIMATED COSTS 4.050' 8" Pipe - $2,025,000 550' FM - $220,000 1 PS - $500,000 Total - $2,745,000 7,800' 8" Pipe - $3,900,000 6,600' 8" Pipe - $3,300,000 12,200' 8" Pipe - $6,100,000 3,900' 8" Pipe - $1,950,000 5,200' 8" Pipe - $2,600,000 4,800' 8" Pipe - $2,400,000 13 Grinder Pumps - $130,000 1,000' 2" FM - $250,000Total - $2,780,000 24,000' 8" Pipe - $12,000,000 4 Grinder Pumps - $40,000 1,000' 2" FM - $250,000 Total - $12,290,000 24,200' 8" Pipe - $12,100,000 850' FM - $340,000 1 PS - $500,000 Total - $12,940,000 5,000' 8" Pipe - $2,500,000 7,000' 8" Pipe - $3,500,000 3,100' 8" Pipe - $1,550,000 8,000' 8" Pipe - $4,000,000 2,650' 8" Pipe - $1,325,000 3,200' 8" Pipe - $1,600,000 3,950' 8" Pipe - $1,975,000 4,400' 8" Pipe - $2,200,000 2,250' 8" Pipe - $1,125,000 5,750' 8" Pipe - $2,875,000 2,000' 8" Pipe - $1,000,000 3,950' 8" Pipe - $1,975,000 4,650' 8" Pipe - $2,325,0002,350' FM - $940,000 1 PS - $500,000Total - $3,765,000 4,650 8" Pipe - $2,325,000 900' FM - $360,000 1 PS - $500,000 38 Grinder Pumps - $380,000 4,300' 2" FM - $1,075,000 Total - $11,740,000 8,500' 8" Pipe - $4,250,0002,000 FM - $800,000 1 PS - $500,000 Total - $5,550,000 Rest of City 77,350' 8" Pipe - $38,675,000 5 Grinder Pumps - $50,000 800' 2" FM - $200,000 Total - $38,925,000 7,900' 8" Pipe - $3,950,000 2,000 FM - $800,000 1 PS - $500,000 Total - $5,250,000 N 3,500 0 3,500 7,000 Feet City of Auburn Sewer Comprehensive Plan Chapter 5 5-21 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 5.4 Asset Management All utilities manage their assets in one way or another through maintenance practices, capital improvement projects, and R&R activities. Asset management is a systematic approach to maintaining assets in good working order to minimize future costs of maintaining and replacing them, especially to avoid costly deferred maintenance. The best practices for asset management involve systematically basing choices on an understanding of asset condition and performance, risks, and costs in the long term. Asset best practices include: • having knowledge about assets and costs (i.e., detailed inventories) • maintaining desired LOSs • taking a life-cycle approach to asset management planning • implementing the planned solutions to provide reliable, cost-effective service • establishing funding levels and rates to support ongoing infrastructure rehabilitation or replacement projects The first step to effectively managing sewage assets is to establish LOS goals for the City as described in Chapter 3 of this Plan. The second step is preparing a comprehensive inventory of the assets. The next steps include performing asset assessments and economic analyses to estimate life-cycle costs and the risk associated with each of the City’s wastewater assets. The 2009 Comprehensive Sewer Plan included development of an economic life assessment tool to help with asset management. An economic life analysis identifies optimal timing for facility replacement or repair and prioritizes facilities for maintenance attention. The analysis assisted with achieving the City’s goals for capital program development, which include sustainably meeting required customer service levels, effectively managing risks, and minimizing the City’s costs of ownership. The analysis also helped with defining M&O program recommendations and aids the Utility’s continuing efforts to achieve a proactive maintenance environment. The economic life assessment tool was a standalone, Excel-based application that required external data to be fed into the model. Since 2009, the City has migrated to the use of Cartegraph, the City’s CMMS, for systems operations. With the data in Cartegraph there is the opportunity to migrate the standalone economic life assessment tool to reside within Cartegraph and run more regularly. Evaluations completed for this Plan consisted of developing a system requirements specification for integrating the pipe criticality model into the City’s asset management system, Cartegraph. Once the pipe inventory is complete (updating GIS to include all required information), and the pipe criticality model is implemented within Cartegraph, the economic life model can be rerun and used to inform future R&R priorities. Currently, the economic life model includes only collection system piping, and there is an opportunity to expand the model to include manholes and pump stations. Further discussion of asset management, and why and how it can be further used to help manage the sanitary sewer system, is provided in Section 9.3. 6-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 6 Maintenance and Operations This chapter provides an overview of the organization and common procedures associated with the ongoing maintenance and operation of the City of Auburn sewer utility system, with the primary purpose of establishing a baseline understanding of the proactive and responsive maintenance procedures performed by City staff. This baseline understanding is used herein to evaluate Utility staffing, data collection and computerized record-keeping needs, and other Utility needs necessary to continue to meet LOS goals. The City sewer system, described in detail in Chapter 4, currently consists of approximately 200 miles of collection system piping, approximately 5,200 manholes, 15 sewer utility pump stations, and 3 siphons and serves more than 18,000 Utility customers. Utility staff also maintain seven stormwater pump stations and five sewer pump stations servicing facilities owned by other City agencies. 6.1 Utility Responsibility and Authority This section provides an overview of the Utility organization and basic information related to Utility staffing, training, and education. 6.1.1 Organizational Structure The Utility is operated as a utility enterprise under the direction of the Community Development and Public Works Department (CDPW) Director. CDPW is responsible for planning, design, construction, operation, maintenance, quality control, and management of the sewer system. The City has a mayor-council form of government; therefore, the CDPW Director reports to the Mayor. The Mayor and City Council provide oversight for the implementation of policies, planning, and management for the Utility. The Engineering Services Division (Engineering) within CDPW is the lead group for comprehensive sewer system planning; development of a CIP; and the design, construction, and inspection of projects related to the sewer system. The City Engineer/Assistant Director of Engineering oversees Engineering and reports directly to the CDPW Director. The Storm/Sewer Manager oversees the Utility, and is responsible for its day-to-day maintenance and operation. The Assistant Director of Public Works Operations, who reports to the CDPW Director, oversees the Storm/Sewer Manager, who in turn oversees 10 employees including a field supervisor. The location of the Utility within the overall CDPW organizational structure is shown in Figure 6-1. Chapter 6 City of Auburn Comprehensive Sewer Plan 6-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Figure 6-1. City of Auburn Department of Community Development and Public Works organizational chart 6.1.2 Staffing Level The Utility currently employs nine full-time M&O field staff plus a manager and a field supervisor, who perform administrative duties. Active field staff, available for sewer maintenance tasks, is estimated to be approximately 6.5 full-time equivalent (FTE) employees as of October 2014. This chapter does not include an evaluation of Utility management, including regulatory compliance, planning, and coordination with other City departments. The position titles and primary functions of the full-time M&O field staff working within the Sewer Division are shown in Table 6-1. Table 6-1. Sewer Utility M&O Field Personnel Position Primary function(s) Sewer/Storm manager Utility administrative duties Sewer field supervisor Supervision of field staff Sewer specialist Two full-time staff dedicated to pump station inspection and maintenance Maintenance worker II Six full-time staff dedicated to field inspection and maintenance Maintenance worker I One full-time staff dedicated to field inspection and maintenance City of Auburn Sewer Comprehensive Plan Chapter 6 6-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 6.1.3 Level of Service The Utility operates in accordance with the LOS criteria outlined in Chapter 3, and internally adopted goals integral to meeting those levels. These goals are generally based on the current staffing level and tasks deemed most critical to the City and its residents. However, the existing staffing requirements discussed in Section 6.6 include near-term goals, which may not be met by existing active staff. 6.1.4 Operator Training and Education The City recognizes the value of having a knowledgeable and well-trained staff operating the Utility, and encourages employees to obtain the highest level of training available. At this time, the State of Washington does not require certification for sewer maintenance operators but the City would support any effort to establish certification for these positions. Seminars, conferences (specifically the annual Washington Wastewater Collection Personnel Association [WWCPA] conference), and college coursework have become tools to advance knowledge for maintenance staff with subjects covered including safety, pumps, generators, forklift training, confined space, first aid, CPR, and electric and electronic fundamentals. Many M&O staff are specialized in specific job functions, which can promote expertise through specialization but also has the potential to limit the ability of the Utility to absorb absences due to vacation, sickness, retirement, and termination. To mitigate this limitation, the City has broadened the scope of the Utility’s education system by initiating a formal cross-training program. 6.2 Routine Operations Routine M&O activities for the Utility can be divided into functional groups by facility type, as described in the following sections. 6.2.1 Pump Station Maintenance Utility staff are responsible for maintenance of 27 pump stations, including 15 sewer utility stations (see Chapter 4), 7 stormwater utility stations, and 5 pump stations serving facilities owned by other City agencies, at the Auburn Golf Course, Auburn City Hall, Auburn Justice Center, Isaac Evans Park, and Auburn Valley Humane Society. M&O activities include scheduled weekly and monthly equipment and grounds maintenance as well as emergency generator testing and maintenance. Pump station maintenance is a full-time commitment for two Utility staff, including a maintenance worker and a sewer specialist. 6.2.1.1 Weekly Activities Weekly pump station inspections are intended as a quick check to ensure proper operation and performance, and to identify potential non-emergency concerns to be addressed during scheduled monthly maintenance. Equipment maintenance schedules are based upon manufacturers’ recommendations for preventive equipment maintenance. Depending on the site and time of year, grounds maintenance may also be performed weekly or postponed for monthly maintenance. Weekly pump station maintenance activities include the following tasks: • perform a general visual inspection of grounds and pump station structure or vault • check equipment for abnormal vibrations • check lubrication of all pumping equipment • check and clean, as needed, seal filters • check ultrasonic level sensor Chapter 6 City of Auburn Comprehensive Sewer Plan 6-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx • check pump run times • bleed lines of moisture • inspect/exercise control valves • check wet well for debris • manually run pump and observe wet well level Weekly inspection activities are intended to be completed in less than 1 hour for each pump station. 6.2.1.2 Monthly Activities Monthly pump station maintenance activities incorporate weekly activities while allowing more time for detailed maintenance and to address any concerns identified during previous weekly maintenance. Monthly maintenance can be particularly important for older pump stations, where equipment and facilities require more attention. Engine-generators are also inspected and tested on a monthly basis. Monthly pump station maintenance activities include the following tasks: • inspect and test engine-generators (see below) • inspect pump station mechanical bypass pumping • flush sump pit and manually run sump pump • clean pump station interior and, at a minimum, wipe down control panels and pumps, and wash down/disinfect floor • inspect fall restraint system • spot-check control system and telemetry alarms Duration of monthly inspection activities varies widely depending upon the age/condition of the pump station and observations made during previous weekly inspections. On average, monthly inspections are assumed to be completed within 2 hours at each pump station. 6.2.1.3 Generator Testing and Maintenance City M&O staff perform limited maintenance on emergency generators serving sewer and stormwater pump stations, primarily to verify the generator’s ability to perform in an emergency. Emergency generators are exercised and fuel levels are evaluated during monthly maintenance activities. Private contracting services are used for detailed generator maintenance. It is recommended that detailed generator maintenance be performed annually. Permanent generators are located at all 15 Utility-owned sewer pump stations. Three of the stormwater pump stations are equipped with permanent engine-generators. During a power outage, pump stations at City Hall and the Justice Center are run via generators that serve the building. Those two generators are not maintained by the Utility. Pump stations not served by permanent generators can be operated using portable generators owned and maintained by CDPW. 6.2.1.4 Wet Well Cleaning and Inspection Wet well cleaning is performed as needed, but on average is necessary twice annually. Some pump stations in service areas with a noted high amount of FOG accumulation require cleaning at a higher frequency (see Section 6.3). Although the City owns a vactor truck, pump station wet well cleaning is performed by a private contractor that can more efficiently clean multiple facilities in a single day because of a larger vactor truck volume. During cleaning, wet wells are drained and the inside is cleaned with high-pressure water. Accumulated FOG and sludge/sediments are suctioned from the wet well by the contractor City of Auburn Sewer Comprehensive Plan Chapter 6 6-5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx and transported to a disposal facility. During cleaning, City staff inspect all floats, sensors, and other hardware while the wet well is drained and they also visually inspect the wet well structure for damage. 6.2.2 Collection System Maintenance Utility staff are responsible for maintenance of approximately 200 miles of collection system piping and approximately 5,200 manholes. M&O activities include pipe cleaning/jetting, closed-circuit television (CCTV) inspection, and manhole maintenance. 6.2.2.1 Manhole Maintenance Manhole maintenance includes initial inspection and potential follow-up cleaning and/or repair. Inspection is performed by one person using utility mapping to locate the targeted facilities. The inspection includes the following: • visual confirmation of proper flow conveyance • assessment of solids buildup in the manhole • evaluation of structural damage or wear and the integrity/condition of manhole covers and ladder rungs Follow-up cleaning and maintenance work orders are generated based upon the results of initial inspection and typically include a two-person crew. Based upon recent maintenance history, it is estimated that approximately 1 in 10 manhole inspections leads to further cleaning. The City estimates that a total of 50 manholes per year require some repair. 6.2.2.2 Sewer Pipeline Cleaning and CCTV Inspection Cleaning and inspection of the sewer system is performed using City-owned vactor/jet truck and CCTV equipment. Cleaning and CCTV inspection are typically performed in tandem from manhole to manhole by a two- or three-person crew3 for each task. Jetting of sewer pipelines and subsequent vactor truck removal is the principal means of removing debris, sludge, FOG, and obstructions from the sewer system. A hose with a special end fitting is inserted into a pipe and high-pressure water (up to 2,500 pounds per square inch [psi]) is sent through the hose. The high-pressure water exits the small hole at the tip of the nozzle, breaking down and/or scouring obstructions. Debris is then removed via suction by the vactor truck equipment at each manhole. Following cleaning, CCTV inspection is performed to identify structural defects and potential pipeline leaks. Routine CCTV inspection of the sewer system is an essential component of the M&O program as it can identify trouble spots before larger failures occur and can provide the City with accurate information about the condition of the sewer collection system. Since the end of 2007, inspection reports and digital video captured by the CCTV crews have been stored within the City’s computer network (PIPELOGIX software). While the ability to edit information in PIPELOGIX is limited to licensed machines, the PIPELOGIX reader is available for all City staff. Currently, the City does not have the ability to transfer the data stored in PIPELOGIX, specifically a summary of pipe condition, to the more comprehensive data stored within Cartegraph, the Utility CMMS software. A primary goal of the Utility in the near future is to use the results of CCTV inspection to populate pipe conditions fields within Cartegraph in order to provide a more accurate planning tool based upon the known condition of wastewater system assets. 3 Although a three-person crew is assigned to these tasks, work may proceed with a two-person crew (at a slower rate) in the case of employee absence. The staffing evaluation in Section 6.6 assumes a three-person crew for pipeline cleaning and CCTV. Chapter 6 City of Auburn Comprehensive Sewer Plan 6-6 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx The City’s goal is to clean and inspect all sewer collection pipes, using the NASSCO PACP, within the system on a 5-year cycle4. On average, a three-person crew can clean approximately 5,000 feet of pipe per day or inspect approximately 2,000 feet of pipe per day. 6.2.3 Field Operations In addition to the M&O activities discussed in Sections 6.2.1 and 6.2.2, the Utility typically maintains a two-person field crew that performs a variety of other ongoing Utility functions. The Utility is also available to assist other Public Works divisions such as Water, Stormwater, or Transportation during manpower shortages or emergencies. Sewer staff perform liaison functions with Engineering and construction inspections for new projects, repairs, or modification of existing lines. Currently, the services for Utility locates are performed by two designated locators who are under the supervision of the Water Division Manager. Examples of field operations activities include: • Repair: Sewer staff perform repair of minor pipe breaks/leaks and other system infrastructure. • Engineering: Sewer staff often provide facility inspection services for Engineering projects and support Engineering through visual observation in the field. • Vehicle and equipment maintenance: The Utility maintains an extensive inventory of equipment available to respond to problems or emergencies. The fleet is currently equipped with seven trucks, one CCTV van, one sewer vactor/jet truck, and one emergency bypass pump. Each component of this fleet is equipped with valve operators and traffic control equipment. • Supply inventory: The Utility maintains an inventory of supplies and parts that are available for use in responding to emergency situations as well as normal Utility operations. Supplies and parts are tracked in an inventory control system that allows easy identification of available materials. It is difficult to quantify the field tasks performed by Utility staff in terms of equivalent staff. Many of these tasks are performed outside of a regular maintenance schedule. The evaluation of existing staffing requirements in Section 6.6 assumes that a two-person field operations crew is maintained for a majority (0.75) of working days, or 1.5 FTE. 6.3 Fats, Oils, and Grease Reduction Program FOG can cause major blockages in sewer pipes when not properly disposed of at the source. When FOG enters a sewer, it cools, solidifies, and sticks to the interior of pipes. FOG buildup increases over time, potentially causing backups in the sewer system and operational concerns within pump stations. Engineering currently employs a 0.25 FTE water resources technician to implement and oversee a City FOG Reduction Program. The program focuses on regulation of food service establishments (FSEs) in order to minimize the amount of FOG entering the City sewer system. The City currently monitors 170 FSEs within the service area, 76 of which are required to use grease trap/interceptor pretreatment facilities before discharge to the sewer collection system. FSEs are identified through the business licensing process, during which all FSEs are required to submit for approval a FOG control plan per ACC Chapter 13.22. ACC also codifies requirements for installation of pretreatment facilities (typically grease traps and interceptors), cleaning and maintenance, water quality testing, and record-keeping. ACC does not have strong language tied to enforcement, nor 4 The frequency goal is specifically intended for all critical areas (serving critical facilities) or piping with a history of repair or maintenance needs. A lower frequency, approximately every 7 years, for the remainder of the collection system would not compromise Utility operations. City of Auburn Sewer Comprehensive Plan Chapter 6 6-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx does the City focus on penalties for noncompliance. It is informal City policy to work with FSEs on a cooperative basis through outreach activities; however, refusal to comply with City requirements can result in code enforcement action. The 170 FSEs are grouped informally into 12 geographic areas. The City goal is to concentrate FOG Reduction Program activities in one area per month, visiting or contacting most FSEs annually. However, because of limited staffing for the program, inspection and education efforts have focused on the highest-priority FSEs and areas with noted FOG issues. On average, only 3 of the 12 FSE areas are inspected or targeted with mailings developed by the City to inform the public and FSEs of FOG issues. In recent years, maintenance staff has noted, at various times, a high accumulation of FOG at the Area 19, F Street, Rainier Ridge, Terrace View, and Riverside pump stations. Following those observations, staff has prioritized those areas for inspections and educational outreach. It is noteworthy that only one of these stations receives some of its wastewater from FSEs and most serve areas with high concentrations of multifamily and rental housing. Sewer staff indicate that they have observed improvements in the accumulation of FOG in the collection system and pump stations following those efforts, but there is currently no system to quantify FOG reduction. In addition to efforts to reduce the amount of FOG in the system, education and outreach efforts include discouraging the flushing of cleaning wipes that may be labeled “flushable,” but that do not disperse in water. These items can clog sewer lines and get caught in pumps, increasing maintenance efforts within both the City collection and conveyance system, and King County’s treatment system. 6.4 Non-Routine and Emergency Operations This section discusses unscheduled activities performed by sewer M&O staff, and provides a response plan for emergency conditions. The intent of the routine inspection and maintenance activities discussed in Sections 6.2 and 6.3 is to minimize, through proactive management of the sewer facilities, the potential for conditions that could lead to emergencies. 6.4.1 Customer Service Requests Customer service requests, such as a localized sewer backup complaint, trigger creation of a work order to inspect the affected area or sewer facility and identify potential solutions. In some cases, relatively simple solutions can alleviate the issue. However, other cases require coordination with Engineering or other City departments. On average, City sewer staff respond to approximately 50 customer service/complaint-related work orders per year. The effort required to resolve complaints varies considerably. Good record-keeping can help in complaint resolution by ensuring that all relevant data are gathered and by serving as a reminder to resolve the complaint and notify the complainant. When a complaint is received, the following information should be recorded to the greatest extent possible: • name and contact information of the person making the complaint • brief description of the nature of the complaint − if sewer overflow, include estimate of volume and duration of overflow • time and date the complaint was received • M&O staff assigned to respond Following initial response, the complaint record is updated to include the results of inspections and corrective actions taken, if any. If the complaint cannot be resolved internally within the Utility, the complaint record should be forwarded to Engineering for further investigation. Notification of any system investigation and/or action should be provided to the customer making the complaint. Chapter 6 City of Auburn Comprehensive Sewer Plan 6-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 6.4.2 Emergency Response Program The Utility, in conjunction with the other utility divisions, has prepared a Public Works Emergency Response Manual as a guide on how to handle emergency situations. The manual is by no means all- inclusive for every type of disaster; however, it is a valuable tool for dealing with many of the emergency situations that municipalities face. Copies of the Emergency Response Manual are available at the CDPW M&O Building, at the City Hall Annex with the City Engineer, and at Fire Station 33 with the fire chief. The Emergency Response Manual is one element of the City’s Comprehensive Emergency Management Plan. The primary objectives of the Comprehensive Emergency Management Plan are to ensure public safety, restore essential services as quickly as possible, and provide assistance to other areas as required. There is also a master response program for the entire City as documented in the Emergency Operations Plan. The material in the Emergency Operations Plan provides guidance for mitigation, preparedness, responsibilities, recovery operations, training, and community education activities. Copies of the Emergency Operations Plan are located in each City department, the Public Works M&O Building, and the Valley Regional Fire Authority (Station 31). The Utility has implemented a standby program whereby one on-call employee is designated to be the first to receive after-hours emergency calls. Most sewer system problems that occur outside normal working hours are reported through the City’s 911 emergency response system. An emergency call-out list is provided to the emergency operator in order to contact Utility staff in case of an emergency. The primary responder to those after-hours calls is the on-call employee. Utility M&O staff have been trained to respond to system emergencies. The contacted staff assesses the situation, contacts additional staff as necessary, and then responds in accordance with established emergency response procedures. 6.5 Communications, Data Collection, and Record-Keeping This section describes the electronic communication, data collection, and record-keeping systems used by Utility staff. 6.5.1 Telemetry and Pump Station Controls The Utility uses a computerized system (SCADA) to monitor and operate, as necessary, the sewer and storm pump stations from a centralized location. SCADA information from all sewer, storm, and water facilities is routed via radio signals to the M&O control center located at 1305 C Street SW. The control center monitors wet well levels at all of the sewer pump stations together with pump run times and cycles. Logic programming automates the sewer pump station operation via ultrasonic level detectors with backup high and low float switches. The control center is configured to sound an alarm in the M&O building if a recognized anomaly is detected. The alarm system is linked to an automatic telephone dialer that will seek sewer personnel to investigate the anomaly in the event that the problem occurs during non-working hours. All alarm and pump information is recorded within the computer that functions as the control center. The SCADA and telemetry systems were recently updated throughout the sewer system and added to several previously unserved pump station locations. The completed project provides the City with up- to-date technology and uniformity throughout the Utility. City of Auburn Sewer Comprehensive Plan Chapter 6 6-9 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 6.5.2 Data Collection and Record-Keeping Data collection and record-keeping functions for the Utility are performed using Cartegraph, a Web- based commercial software package provided by Cartegraph Inc. Cartegraph integrates GIS data with Utility M&O records, providing managers with overview information about system and operational performance, and field crews with information related to the condition and failure history of specific wastewater facilities. The City currently uses Cartegraph to plan field staff activities (work orders), record results of both routine and non-routine maintenance, and compare actual maintenance efforts to City goals. The City recently upgraded the Cartegraph system and plans to transition toward its use as an asset management tool, through which the City would optimize staffing and capital resource planning. In recent years, the City has made considerable progress in adding asset information to Cartegraph, specifically GIS data, physical information related to size and material, and installation date. However, to fully utilize the asset management function of Cartegraph, additional information related to risk, asset criticality, and condition is also necessary. To assist the City’s transition to an asset management program, the attributes listed below should be used within Cartegraph to define each of the City sewer assets (manhole, pipe segment, pump, etc.). 6.5.2.1 Asset-Specific Attributes The following asset-specific attributes are related to the asset and remain relatively unchanged over time: • Asset ID: The unique asset number that is used by all business systems to identify an asset. • Location: Where the asset is located (GIS). • In-service date: The date the asset was placed into service. • Replacement cost: The cost to replace the asset and the year that the cost data were calculated. • Useful life: The average life expectancy of the asset. • Asset criticality: A value assigned to each asset that indicates how essential it is to maintaining a defined LOS. Typically it is defined as a combined score based on the consequence of failure and the likelihood of failure, as defined below: − Consequence of failure: The social and economic cost if the asset fails − Likelihood of failure (condition): The estimated time until the asset fails, usually based on condition • Asset class: A group of assets that share the same characteristics (e.g., manholes, pipe segments). Asset class is used to estimate replacement costs and useful life of groups of assets. • Nameplate information and asset specifications: Important information that is used to uniquely describe an asset such as the manufacturer name, type of asset, serial number, size, material, etc. This information is used for asset identification, replacement, and repair. 6.5.2.2 Maintenance and Operation Attributes The following M&O attributes are captured as part of the operations, maintenance, and repair history associated with each asset. • Asset ID: Most work orders should be associated with one or more assets. The asset ID is used to uniquely associate work with individual assets. • Issue, cause, action: These codes are used to classify historical M&O activities associated with corrective actions or unplanned maintenance. − Issue: What is the problem observed in the field? Chapter 6 City of Auburn Comprehensive Sewer Plan 6-10 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx − Cause: What is the underlying cause of the problem? − Action: What was done to address the cause? • Target hours and actual hours: Recording the estimated hours and actual hours to complete a work order can help in determining efficiency, planning workloads, and assessing repair costs. • Target start/stop date and actual dates: Recording the estimated and actual start and stop dates for a work order can help in determining efficiency, planning workloads, and assessing repair costs. • Work order costs: Work order costs include labor, parts, materials, and equipment, and should be accurately recorded for each work order. • Work order type: Work order types are used to group and compare different types of work activities. Typical work order types include: − Capital improvement: Work associated with a capital improvement project − Corrective maintenance: Work associated with an unplanned repair − Preventive maintenance (PM): Work associated with a planned preventive maintenance activity − Predictive maintenance (PdM): Work associated with predictive measures (usually for critical assets) • Warranty information: Helps to determine assets that are under warranty and the warranty maintenance requirements. 6.6 Existing Staffing Requirements Existing staffing requirements for M&O activities as discussed in this chapter were compiled and evaluated to determine staffing requirements needed to efficiently operate, maintain, repair, and collect and report the information necessary to properly operate the sewer system. Table 6-2 evaluates the estimated time to conduct sewer system M&O tasks in the manner currently performed. Calculated days for each M&O activity are for a single person performed over an 8-hour “day.” Therefore, an activity that is performed quarterly and that requires 4 hours and two M&O staff to complete would result in an annual requirement of 4 days. City of Auburn Sewer Comprehensive Plan Chapter 6 6-11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 6-2. Sewer System Maintenance and Operation Task Summary Work activity FTE days required annually Assumptions/City goal Collection system maintenance Manhole inspection 22 Inspect once every 4 years, total of 5,200 manholes. Perform 60 inspections per day with one-person crew. Manhole cleaning 65 One cleaning is required for every 10 inspections. Two-person crew, 2 hours each. Manhole repair 50 50 repairs per year. Two-person crew, 4 hours each. Pipeline cleaning 210 City goal is 210,000 ft per year (entire system in 5 years). A three-person crew can clean 3,000 ft of pipe per day. CCTV inspection 420 City goal is 210,000 ft per year (entire system in 5 years). A three-person crew can CCTV-inspect 1,500 ft of pipe per day. Pump station maintenance Weekly routine maintenance 263 27 pump stations weekly (52 per year). Two-person crew, 0.75 hour each. Monthly routine maintenance 162 276 pump stations monthly (12 per year). Two-person crew, 2 hours each. Wet well cleaning 27 27 pump stations, 2 per year. Two-person crew, 2 hours each. Other sewer M&O activities Field operations 330 Two-person field crew for 0.75 of working days (1.5 FTE). Customer service requests/complaints 50 50 requests per year. Two-person crew, 4 hours each. Data entry 260 40 hours per week total. Subtotal 1,859 Total 2,045 Assumes 10% unquantified work Total number of working days available per FTE 200 Based on 10-year average Number of FTEs required 10.2 2,045 days required divided by 200 days per FTE year. Current FTEs 9 Table 6-2 shows that the Utility is under-staffed with respect to meeting current City goals for M&O activities. The analysis confirms the qualitative assessment of staffing adequacy provided by City staff during workshop discussions. Based upon discussion with City staff, there are portions of the collection system piping for which there is no CCTV record. Because of limited staff, areas of the collection system have received higher priority due to frequent need for maintenance (older pipe in poor condition), relatively flat slopes, or high concentrations of FOG. There will likely be a need for additional staff to perform more frequent cleaning and CCTV inspection of the entire system and to account for sewer system expansion with overall city growth. It is recommended that the City consider hiring two new Utility staff to meet M&O activity goals. 6.7 Potential Improvement Opportunities and Capital Needs The Utility has a positive track record for M&O, as evidenced by the limited need for non-routine maintenance and few customer service requests/complaints. Routine facility cleaning, regular inspections, experienced staff, and a well-planned sewer system contribute to that success. However, the growing backlog for collection system maintenance (cleaning and CCTV) should be addressed by the City by adding to the current M&O staff. An additional 2 FTE are required to achieve current City proactive M&O goals (see Table 6-2). Chapter 6 City of Auburn Comprehensive Sewer Plan 6-12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Based upon discussions with City staff and analysis of M&O activities discussed in this chapter, the following improvement opportunities are available to the Utility. These opportunities are based on improving existing services and improving work productivity: • Continue to integrate asset management with existing Utility management software (CMMS and GIS): − Continue to add GIS attributes to known Utility assets. − Perform and document condition assessments. Use defined criteria (such as leaks/cracks observed, cleanliness, and other specific measures) and provide staff training to ensure assessment consistency. Use NASSCO PACP-certified inspection programs to allow integration of inspection results with Cartegraph. − Over time, use the results of condition assessments to move toward risk-based maintenance to best utilize staff resources. For example, consistently high assessment scores would result in a lower risk or need for maintenance, allowing M&O staff to be diverted to more essential activities. • Complete inspection of inverted siphons (river crossings, see Section 4.2.4) for which there is no record of pipe condition. The City does not have the equipment to inspect these facilities; therefore, contract services will be required. • Hire one permanent, full-time staff member for CMMS data entry, maintenance tracking, and reporting. This staff member would support the City Sewer, Stormwater, and Water utilities and would be a liaison with the City Innovation and Technology (IT) Division. • Initiate a manhole ring and cover replacement project, targeting a specific percentage of system assets per year. Results of PM indicate a general deterioration of manhole covers within the system. • Based on staff observations regarding the location of maintenance issues caused by FOG accumulation, continue to manage FSE’s compliance with FOG requirements at its current level, and increase public education efforts to minimize FOG discharge in residential areas. 7-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 7 Recommended Plan This chapter discusses recommended capital projects for the City of Auburn’s sewer system. The capital projects necessary to meet and maintain the City’s LOS through the 20-year planning period (2016–35) are presented as a CIP. This Plan contains time frames, which are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these time frames are estimates, and depending on factors involved in the processing of applications and project work, and availability of funding, the timing may change from the included time frames. The framework does not represent actual commitments by the City, which may depend on funding resources available. The identification of projects is an ongoing effort requiring periodic evaluation. This CIP list was developed based on incorporating the City’s Capital Facilities Program (CFP), identification of equipment limitations within the M&O group, and identification of areas of improvement. 7.1 Capital Improvement Program The CIP focuses on addressing known problems in a manner identifying cost-effective solutions that incorporate the risks associated with underperforming facilities and the uncertainty inherent in engineering calculations/model simulations. A flow chart depicting the process of CIP development is shown in Figure 7-1. Figure 7-1. CIP development flow chart The CIP places emphasis on projects identified for implementation between 2016 and 2021, which constitutes the 6-year planning period for utility capital funding requirements and staffing needs. This period provides a realistic outer limit for accurately forecasting the annual cycle of utility projects and priorities. This Plan also includes a 20-year CIP that examines long-term capital requirements, such as the replacement of infrastructure as it exceeds its useful life. All projects in the CIP are consistent with the LOS described in Section 3 of this document. Evaluate system Define policies and criteria Plan capital projects Evaluate costs and benefits Complete CIP Not Acceptable Acceptable Chapter 7 Auburn Sewer Comprehensive Plan Update 7-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 7.1.1 Project Priority All projects in the CIP have been designated a priority for implementation. Priority was assigned as one of three designations. Projects in the top tier, or highest priority, are designated priority 1; projects in the middle tier are designated priority 2; and projects with the lowest priority relative to the other projects are considered priority 3. The priority levels are based on how the proposed project impacts LOS. The project descriptions below include the designated priority. 7.1.2 Project Cost Estimated costs for each project are included in the CIP descriptions below. The costs are planning- level estimates. Actual costs will depend on various factors at the time of design and construction including labor and material costs. Estimated costs include an allowance for engineering, administration, legal fees, construction costs, sales tax, and construction supervision. Permitting and land, easement, and/or right-of-way acquisitions are not included in the cost estimate. The costs estimates are in 2014 dollars. CIP projects 1 and 2 are part of the City’s Capital Facilities Program, where the City developed the costs for these projects. 7.2 Project Summary The CIP projects mainly consist of ongoing and programmatic capital improvements. Ongoing projects include projects identified through previous studies. The City has previously allocated funding to each of these projects, which are currently in various stages of execution. These projects must continue to receive funding under the CIP until completion and have been included in this document to provide a complete picture of the program. Programmatic projects are included in the CIP to provide funding for maintaining and/or improving the LOS. These projects do not address a problem at a specific location, but allocate budget for addressing LOS goals citywide. As discussed in Chapter 5, the system hydraulic analysis indicated no need for capacity-related capital projects in the 6-year or 20-year planning period. The next Plan update, scheduled for 2020 and repeating every 6 years, has been included as a cost in Table 7-1; however, there is not a description for the project. City of Auburn Sewer Comprehensive Plan Chapter 7 7-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 7-1. Annual Project Cost Summary for 6-Year and 20-Year CIP Project number Project name Priority 2016 2017 2018 2019 2020 2021 2022–35 Project Cost CIP allocations (repair/ replacement) CIP allocations (upgrade/ expansion) 1 Sanitary Sewer Repair and Replacement/System Improvements 1 $1,873,000 $300,000 $1,500,000 $300,000 $1,500,000 $300,000 $12,600,000 $18,373,000 100% 0% 2 Street Utility Improvements 1 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $2,800,000 $4,000,000 100% 0% 3 Vactor Decant Facility 1 $150,000 $0 $0 $0 $0 $0 $0 $150,000 0% 100% 4 Sewer Pump Station Replacement/ Improvement 1 $0 $141,000 $500,000 $168,000 $900,000 $141,000 $2,850,000 $4,700,000 100% 20% 5 Siphon Assessment 1 $0 $524,000 $0 $0 $0 $0 $524,000 $1,048,000 100% 0% 6 Pump Station Condition Assessment 1 $187,000 $0 $0 $0 $0 $0 $187,000 $374,000 100% 0% 7 Manhole Ring and Cover Replacement 2 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $1,120,000 $1,600,000 100% 0% 8 Cleaning and Inspection of Large-Diameter Pipe 2 $0 $400,000 $0 $0 $0 $0 $400,000 $800,000 100% 0% 9 Inflow and Infiltration Study 3 $0 $135,200 $135,200 $135,200 $135,200 $135,200 $0 $676,000 100% 0% 10 Plan Update 1 $0 $0 $0 $0 $350,000 $0 $700,000 $1,050,000 50% 50% Total cost for priority 1 projects $2,410,000 $1,165,000 $2,200,000 $668,000 $2,950,000 $641,000 $19,661,000 $29,695,000 Total cost for priority 2 projects $80,000 $480,000 $80,000 $80,000 $80,000 $80,000 $1,520,000 $2,400,000 Total cost for priority 3 projects $0 $135,200 $135,200 $135,200 $135,200 $135,200 $0 $676,000 Total CIP cost $2,490,000 $1,780,200 $2,415,200 $883,200 $3,165,200 $856,200 $21,181,000 $32,771,000 Chapter 7 Auburn Sewer Comprehensive Plan Update 7-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 1 Project name Sanitary Sewer Repair and Replacement/System Improvements Location Throughout the SSSA Priority 1 Schedule Ongoing, alternating a large project every other year Problem summary As infrastructure ages, failures begin to appear, causing LOS issues Description This project is R&R of existing sewer lines, manholes, public side sewers, and other facilities. These assets will be identified through closed-circuit television (CCTV) inspection and routine cleaning and monitoring. This particular program includes proposed projects that do not have an approved Project Management Plan, or are not associated primarily with the Save Our Streets (SOS) or other transportation improvements. Anticipated projects include biannual, standalone, R&R projects for sewer lines that are broken, misaligned, “bellied,” or otherwise require an inordinate amount of maintenance effort or present a risk of backup or trench failure, and facilities that generate consistent odor complaints. Improvements identified through this program may be completed as components of larger projects to gain efficiencies in project costs. Additionally, system improvements that enhance the ability to maintain service are included here. It is anticipated that the Economic Life model, once developed and integrated with Cartegraph, will be the source behind planning the R&R program. This project is planned to occur during both the 6- and 20-year CIPs. Recommended predesign refinements Refine list as additional information becomes available Cost estimate Costs developed by the City and carried over from the Capital Facilities Plan 2016 $1,873,000 2017 $300,000 2018 $1,500,000 2019 $300,000 2020 $1,500,000 2021 $300,000 2022–35 $12,600,000 Project Cost $18,373,000 City of Auburn Sewer Comprehensive Plan Chapter 7 7-5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 2 Project name Street Utility Improvements Location Throughout the SSSA Priority 1 Schedule Ongoing Problem summary As infrastructure ages, failures begin to appear, causing LOS issues. Description This project is R&R of existing sewer lines, manholes, and public side sewers located within the project limits of City arterial transportation projects and within the SOS program. Coordinating sanitary sewer utility projects with arterial transportation projects can lower the unit cost of pipe replacement by eliminating the pavement restoration component of the sewer project’s costs. This project is planned to occur during both the 6- and 20-year CIPs. Recommended predesign refinements Refine list as additional information becomes available Cost estimate Costs developed by the City and carried over from the Capital Facilities Plan 2016 $200,000 2017 $200,000 2018 $200,000 2019 $200,000 2020 $200,000 2021 $200,000 2022–35 $2,800,000 Project cost $4,000,000 Project number 3 Project name Vactor Decant Study Location N/A Priority 1 Schedule 2016 Problem summary Hauling saturated wastes to County landfills costs operating budget and takes away from crew time, reducing other work they could be completing. Description Currently the City hauls vactored sewage waste to the County landfill on a biweekly basis. The sewage sludge is considerably wet, thus City funds are paying for the disposal of water. A study is needed to assess the City’s vactor disposal method and identify a cost-effective alternative to the status quo. Possible recommendations may include maintaining current operations, constructing a gravity decant facility, incorporating special equipment into the vactor truck to increase decanting ability, or purchasing specialized dewatering machinery. Recommended predesign refinements Identify current City practices, how much sewage waste is vactored, how much liquid can be decanted from the vactor truck, and the volume and percent water of the waste disposed at the County landfill. Cost estimate Engineering services for study $100,000 Subtotal line-item costs $100,000 Project contingency (30% of all above costs) $30,000 Subtotal inspection costs $130,000 Administration (15% of costs) $20,000 Project cost $150,000 Chapter 7 Auburn Sewer Comprehensive Plan Update 7-6 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 4 Project name Sewer Pump Station Replacement/Improvements Location Throughout the SSSA Priority 1 Schedule 2017–22 Problem summary The 8th Street Pump Station, Valley Meadows Pump Station, and 22nd Street Pump Station have been identified as needing to be renovated, replaced, and/or relocated based on condition, safety concerns, and to accommodate growth. This CIP provides for a programmatic program to renovate or replace these pump stations on a bi-annual basis. The anticipated order for modification/replacement is: 1. 8th Street Pump Station 2. Valley Meadows Pump Station 3. 22nd Street Pump Station It is anticipated that additional stations will require significant improvements and/or replacement within the 6 – 20 year planning horizon as well. The sum of the estimated cost for the first three pump stations is used as a placeholder for project value. Following the results of the systematic pump station evaluation study scheduled for 2016 (CIP project 6, Pump Station Inspections), the sequence or identification of pump stations requiring R&R, and detailed scope of improvements for each of these stations will be developed. Description This project will renovate or replace the three currently identified pump stations within the 6-year CIP and allocates money for R&R of unknown pump stations in the 6- to 20-year CIP. Recommended predesign refinements The Valley Meadows Pump Station is identified as a possible candidate for relocation to allow for future sewer expansion. The need for relocation should be assessed and planned for prior to 2019. The costs below for all pump stations do not include provisions for new gravity or force main piping. The costs also assume that the existing generators on site will be reused and that no additional land or site improvements are required. Cost estimate 1. 8th Street Pump Station (2017/2018) Package pump station $300,000 Project contingency (50% of all above costs) $150,000 Washington State and King County sales taxes (9.5% of all above construction costs) $43,000 Subtotal construction costs $493,000 Administration, engineering design, and permitting (30% of costs) $148,000 Subtotal $641,000 2. Valley Meadows Pump Station (2019/2020) Package pump station $300,000 Project contingency (50% of all above costs) $150,000 Washington State and King County sales taxes (9.5% of all above construction costs) $43,000 Subtotal construction costs $493,000 Administration, engineering design, and permitting (30% of costs) $148,000 Subtotal $641,000 3. 22nd Street Pump Station (2021/2022) Package pump station $500,000 Project contingency (50% of all above costs) $250,000 Washington State and King County sales taxes (9.5% of all above construction costs) $72,000 Subtotal construction costs $822,000 Administration, engineering design, and permitting (30% of costs) $246,000 Subtotal $1,068,000 Project cost $2,350,000 City of Auburn Sewer Comprehensive Plan Chapter 7 7-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 5 Project name Siphon Assessment Location Green River crossing near 26th Street NE; Green River crossing over 8th Street NE Bridge; Railroad crossing near intersection of 6th St. NW and H St. NW Priority 1 Schedule 2017, positioned in an off year of CIP 1, repeated in 10 years, 2027 or as initial inspection warrants Problem summary Currently, the City does not have the required equipment to complete inspections of the three siphons located within its collection system. Their condition is unknown. Description This project would inspect each siphon to determine its condition and help set future inspection/cleaning protocols. The siphons would be inspected prior to cleaning to determine what their in situ condition is, then if required the lines would be cleaned and re-inspected. Based on the debris level and condition of the pipes, future activities can be planned. Repeat in 10 years. For cost efficiencies, it is assumed that all three sites would be completed under one contract. This project is planned to occur during both the 6- and 20-year CIPs. Recommended predesign refinements Determine flow rates required for bypass pumping/trucking. Verify the assumption that the Green River crossing at 26th Street NE can be diverted to each barrel without the need for additional bypass pumping. Cost estimate Green River crossing via inverted siphon at 26th Street NE: 488 feet of 8" and 12" HDPE Initial CCTV $2,500 Cleaning $2,000 Post-cleaning CCTV $2,500 Subtotal $7,000 Green River crossing via 8th Street NE bridge: 1,191 feet of 14" CIP Traffic control $75,000 Bypass pumping $80,000 Initial CCTV $6,000 Cleaning $4,800 Post-cleaning CCTV $6,000 Subtotal $171,800 Railroad crossing adjacent to H and 6th streets: 287 feet of 18" unknown Traffic control $20,000 Bypass pumping (trucking) $80,000 Initial CCTV $1,500 Cleaning $1,200 Post-cleaning CCTV $1,500 Subtotal $104,200 Subtotal line-item costs $283,000 Project contingency (30% of all above costs) $85,000 Washington State and King County sales taxes (9.5% of all above construction costs) $35,000 Subtotal construction costs $403,000 Administration, engineering design, and permitting (30% of costs) $121,000 Project cost $524,000 Chapter 7 Auburn Sewer Comprehensive Plan Update 7-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 6 Project name Pump Station Condition Assessment Location Throughout the SSSA Priority 1 Schedule 2016 and 2026 Problem summary The City last completed a pump station condition assessment in 2007. The pump stations have continued to age, regulations/codes have changed, and the City’s expectations of the pump stations have changed over time. To adequately plan for future pump station investments, re-inspection is required. Description The assessment will evaluate the apparent physical condition of existing stations and equipment. The purpose of the assessment is to predict future serviceability and anticipated longevity for development of future CIPs. Pump stations must meet the adopted LOS in a safe and reliable manner. Stations must meet current code conditions, which may differ from those that existed when the stations were originally built. The assessment would identify requirements necessary to meet the City’s LOS, requirements necessary for the health and safety of staff and the public, and suggestions that might increase reliability or reduce cost of operations or maintenance. Equipment checklists will be prepared for mechanical/hydraulic and electrical/control systems, site visits to all stations will be made, as-built information and M&O manuals will be reviewed, and M&O personnel will be asked about known issues at each location. Station operation will be observed, but no detailed physical testing of equipment, wiring, controls, or structures will be included. To stay up to date on pump station needs, it is recommended to repeat the inspection within the 20-year CIP. Recommended predesign refinements None Cost estimate Engineering services for condition assessment $125,000 Subtotal line-item costs $125,000 Project contingency (30% of all above costs) $38,000 Subtotal inspection costs $163,000 Administration (15% of costs) $24,000 Project cost $187,000 City of Auburn Sewer Comprehensive Plan Chapter 7 7-9 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 7 Project name Manhole Ring and Cover Replacement Location Throughout the SSSA Priority 2 Schedule Ongoing Problem summary According to M&O staff, there are failing frame and covers on sewer manholes. While the rest of the manholes are in acceptable condition, the frames and covers need to be replaced. Description This project would establish an ongoing CIP to provide funds for continued replacement of frames and covers. The cost for this effort is based on historical, all-inclusive spending from previous City of Auburn work. This project is planned to occur during both the 6- and 20-year CIPs. Recommended predesign refinements None Cost estimate Frame and cover replacement $80,000 Subtotal line-item costs $80,000 Project contingency (0% of all above costs) $0 Washington State and King County sales taxes (9.5% of all above construction costs) Included Subtotal construction costs $80,000 Administration, engineering design, and permitting (0% of costs) $0 Project cost $80,000 Project number 8 Project name Cleaning and Inspection of Large-Diameter Pipe Location Throughout the SSSA Priority 2 Schedule 2017, positioned in an off year of CIP 1, repeated in 10 years, 2027 or as initial inspection warrants. Problem summary According to M&O staff, they are not equipped to efficiently clean pipe larger than 18 inches in diameter. Description This project would clean and internally inspect all pipe owned by the City that is larger than 18 inches in diameter. This is approximately 39,300 feet, ranging in diameter from 20 inches up to 36 inches. This project is planned to occur during both the 6- and 20-year CIPs. Recommended predesign refinements Review existing CCTV inspection information to see if any of the large-diameter pipe has been inspected and determine if it needs cleaning. Cost estimate Cleaning $75,000 CCTV $82,000 Disposal $10,000 Traffic control $20,000 Subtotal line-item costs $187,000 Project contingency (50% of all above costs) $94,000 Washington State and King County sales taxes (9.5% of all above construction costs) $27,000 Subtotal construction costs $308,000 Administration, engineering design, and permitting (30% of costs) $92,000 Project cost $400,000 Chapter 7 Auburn Sewer Comprehensive Plan Update 7-10 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number 9 Project name Inflow and Infiltration Study Location Throughout the SSSA Priority 3 Schedule Begin 5-year study in 2017 Problem summary I/I does not appear to be an issue based on capacity. However, little to no work has been done to actually try and quantify actual I/I rates. This project would assess the City SSSA to determine I/I values. Excessive localized I/I can also be an indicator of poor sewer main and side sewer condition. Description This project would monitor flow in the collection system over 5 years. These data will then be used in the next Comprehensive Sewer Plan for modeling purposes and I/I assessment. Recommended predesign refinements Analyze existing flow metering and hydraulic model to develop a flow monitoring plan. Cost estimate Flow monitoring (four flow meters and two rain gauges for 6 months per year) $365,000 Subtotal line-item costs $365,000 Project contingency (30% of all above costs) $110,000 Washington State and King County sales taxes (9.5% of all above construction costs) $45,000 Subtotal construction costs $520,000 Administration, engineering design, and permitting (30% of costs) $156,000 Project cost $676,000 8-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 8 Finance The objective of the financial plan is to identify the total cost of providing sewer service and to provide a financial program that allows the Utility to remain financially viable during execution of the identified CIP. This viability analysis considers the historical financial condition of the Utility, the sufficiency of Utility revenues to meet current and future financial and policy obligations, and the financial impact of executing the CIP. Furthermore, the plan provides a review of the Utility’s rate structure with respect to customer affordability. 8.1 Past Financial Performance This section includes a historical (2008–13) summary of financial performance as reported by the City of Auburn on the statement of revenues, expenses, and changes in net position and the statement of net position, specific to the Utility. 8.1.1 Statement of Revenues, Expenses, and Changes in Net Position Table 8-1 shows a consolidated statement of revenues, expenses, and changes in net position for 2008–13. 8.1.1.1 Findings and Trends Operating income (including depreciation expense) has been negative over the entire 6-year historical period. Operating losses grew from a loss of nearly $556,000 in 2008 to a maximum loss of $2.3 million in 2011. However, operating income improved significantly in 2012, resulting in a net loss of only $460,000 and $260,000 in 2012 and 2013, respectively. Depreciation is a non-cash expenditure, so even though operating income has been negative in every year, cash flow was positive in most years during the 6-year period. A few key financial ratios are discussed below. Unless otherwise noted, the stated benchmarks are based on industry standards: • M&O coverage ratio (operating revenues including depreciation divided by operating expenses): − Benchmark: A ratio of 1.0 or higher is a desirable result, indicative of sufficient revenues to meet cash operating expenses as well as to cover depreciation expense. − Results: Increased from 0.96 in 2008 to 0.99 in 2013, which is a positive trend. • Operating ratio (total operating expenses excluding depreciation divided by total operating revenues): − Benchmark: A ratio greater than 90 percent indicates there is little room for new debt service and capital replacement without additional rate increases. A ratio greater than 100 percent indicates that cash operating expenses exceed operating revenues and is indicative of an unsustainable financial condition. − Results: Decreased from 95 percent in 2008 to 93 percent in 2013, which is a positive trend overall. However, the operating ratio was at or above 100 percent from 2009 to 2011. • Debt service coverage ratio (operating and interest revenues less M&O expenses excluding depreciation, divided by total annual debt service): Chapter 8 Auburn Sewer Comprehensive Plan Update 8-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx − Benchmark: There are two forms of debt service coverage; one applies to debt service from revenue bonds only, and the other applies to debt service on total debt, including state loans. Revenue bonds typically have a legal minimum coverage requirement of 1.25. State loans usually do not carry a minimum coverage requirement; however, based on industry standards, it is recommended that debt service coverage on total debt be at least 1.0. To be conservative, this review of financial statements looks at coverage on total debt. − Results: Coverage was below industry and City benchmarks from 2009 to 2011, but increased to 2.4 or above in 2012 and 2013, which is a very favorable trend. 8.1.2 Statement of Net Position Table 8-2 shows the consolidated statement of net position for 2008–13. 8.1.2.1 Findings and Trends This statement shows that the City of Auburn’s net position increased from $65.7 million to $77.6 million over the 2008–13 time period. This represents an 18 percent increase over the 6-year period. Cash and cash equivalents have grown 13 percent over this period, increasing from $11.3 million in 2008 to $12.8 million in 2013. Table 8-1. City of Auburn Statement of Revenues, Expenses and Changes in Fund Net Position 200820092010201120122013 OPERATING REVENUES: Charges for services 13,601,390$ 14,902,464$ 15,968,231$ 16,667,149$ 18,585,288$ 21,711,948$ Other Operating Revenue 997 102 272 - - - Total Operating Revenues 13,602,387 14,902,566 15,968,503 16,667,149 18,585,288 21,711,948 OPERATING EXPENSES: Operations and Maintenance 10,071,648 12,215,275 12,666,971 14,177,079 13,841,985 16,005,927 Administration 1,774,962 2,106,258 1,992,048 1,916,148 1,956,954 2,139,329 Depreciation/Amortization 1,282,599 1,390,660 1,372,282 1,603,210 1,746,409 1,886,057 Other Operating Expenses 1,029,045 1,221,815 1,283,759 1,311,789 1,499,459 1,940,915 Total Operating Expenses 14,158,254 16,934,008 17,315,060 19,008,226 19,044,807 21,972,228 OPERATING INCOME (LOSS)(555,867) (2,031,442) (1,346,557) (2,341,077) (459,519) (260,280) NON OPERATING REVENUE (EXPENSES) Interest Revenue 426,168 137,796 45,053 20,756 32,756 20,442 Other Non-Operating Revenue - 19,820 504,300 843,646 111,224 180,381 Interest Expense (20,807) (21,255) (314,931) (156,566) (102,869) (253,574) Other Non-Operating Expenses (2,177) (2,874) - (1,069) (1,069) (4,782) Total Non-Operating Revenue (expenses)403,184 133,487 234,422 706,767 40,042 (57,533) INCOME(LOSS) BEFORE CONTRIBUTIONS AND TRANSFERS (152,683) (1,897,955) (1,112,135) (1,634,310) (419,477) (317,813) CAPITAL CONTRIBUTIONS 7,095,833 592,376 4,406,132 7,329,252 1,974,964 3,255,766 TRANSFERS IN - 89,425 - - - - TRANSFERS OUT (50,000) (50,000) (55,960) (50,000) (50,000) (50,000) Changes in Net Position 6,893,150 (1,266,154) 3,238,037 5,644,942 1,505,487 2,887,953 Net Position, January 1, as Previously Reported 58,764,032 65,657,182 64,391,028 67,629,065 73,274,007 74,779,494 Change in Accounting Principle (19,250) Net Position, January 1, as Restated 74,760,244 Net Position, December 31 65,657,182$ 64,391,028$ 67,629,065$ 73,274,007$ 74,779,494$ 77,648,197$ City of Auburn Sewer Comprehensive Plan Chapter 8 8-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Non-current assets, which represent resources required for use or consumption beyond 1 year, have increased from $54.6 million in 2008 to $71.5 million in 2013. Most of this growth in long-term assets comes from a $23.4 million increase in improvements other than buildings. A few key financial ratios are discussed below. Unless otherwise noted, the stated benchmarks are based on industry standards. Liquidity • Current ratio (unrestricted current assets divided by current liabilities): − Benchmark: A ratio of 2.0 or higher is considered good in terms of healthy liquidity. The current ratio is a measure of short-term financial strength and answers an important question: Are current assets able to cover expected current liabilities in the coming year? − Results: From 2008 through 2013, this ratio has ranged from 4.8 to 25.4, each year well above the recommended benchmark. The ratio was 25.4 in 2008, but decreased to 4.8 in 2009 as a result of an increase in current payables and loans payable as well as a decrease in cash and cash equivalents. The ratio has ranged from 7.4 to 8.8 from 2010 to 2013. Efficiency • Accounts receivable collection period (customer receivables on balance sheet x 365 days then divided by annual sales): − Benchmark: Generally, less than 30 days is considered very good. − Results: Decreased from 44 days in 2008 to 40 days in 2013, which is a positive trend. Capital • Debt to net capital assets ratio (total debt divided by capital assets net of accumulated depreciation): − Benchmark: For utilities, having a capital structure of at least 40 percent equity and less than 60 percent debt is considered a healthy capital structure, with adequate future borrowing capacity and a manageable debt service burden. The City’s capital structure policy is even more conservative: 50 percent debt and 50 percent equity. − Results: Increased from 8 percent debt/92 percent equity in 2008 to 12 percent debt/ 88 percent equity in 2013. This is well within both the industry and City maximum benchmark thresholds. Chapter 8 Auburn Sewer Comprehensive Plan Update 8-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Table 8-2. City of Auburn Statement of Net Position 200820092010201120122013 ASSETS Current Assets Cash and Cash Equivalents 11,337,351$ 8,901,147$ 8,178,622$ 7,855,899$ 10,049,455$ 12,778,843$ Investments 2,003,750 2,023,437 2,009,920 1,996,562 - - Restricted Cash Bond Payments - - 296,268 307,299 448,108 447,210 Customer Deposits 18,471 18,471 16,835 44,053 91,391 95,451 Other 738,017 737,890 4,382,960 1,831,850 514,590 516,972 Customer Accounts 1,636,060 1,739,422 2,025,836 1,971,772 2,108,360 2,375,137 Other Receivables 37,069 14,217 14,217 100 - - Due From Other Governmental Units - - - 15,721 - - Inventories 8,968 8,259 7,414 7,147 6,479 7,009 Total Current Assets 15,779,686 13,442,843 16,932,072 14,030,403 13,218,383 16,220,622 Non Current Assets Long Term Contracts and Notes 1,073,400 1,050,900 1,028,400 983,400 938,400 825,900 Capital Assets Land 1,654,958 1,654,958 1,695,023 1,695,023 1,695,023 1,695,023 Buildings and Equipment 1,131,744 1,131,744 1,140,893 1,171,259 1,171,259 1,235,992 Improvements Other Than Buildings 65,113,774 65,667,532 73,495,451 80,984,120 87,643,097 88,561,822 Construction in Progress 846,620 4,056,688 2,104,633 4,570,300 1,694,876 2,372,710 Less: Accumulated Depreciation (15,200,016) (16,590,677) (17,962,959) (19,566,169) (21,312,578) (23,198,636) Total Capital Assets ( Net of A/D)53,547,080 55,920,245 60,473,041 68,854,533 70,891,677 70,666,911 - - - - - - Total Non-Current Assets 54,620,480 56,971,145 61,501,441 69,837,933 71,830,077 71,492,811 Total Assets 70,400,166 70,413,988 78,433,513 83,868,336 85,048,460 87,713,433 LIABILITIES Current Liabilities Current Payables 424,743 1,921,254 473,770 501,844 423,363 627,749 Current Deposits 18,471 18,471 16,835 - - - Loans Payable-Current - 236,791 288,262 288,262 288,262 288,262 Employee Leave Benefits-Current 69,282 72,952 73,325 90,346 97,848 108,988 Revenue Bonds Payable-Current - - - - 141,162 144,845 General Obligation Bonds Payable-Current - - - - - - Accrued Interest 13,183 14,205 309,091 317,569 316,496 311,195 Deposits - - - 44,054 91,391 95,450 Total Current Liabilities 525,679 2,263,673 1,161,283 1,242,075 1,358,522 1,576,489 Non Current Liabilities Unearned Revenue 162,203 162,203 162,203 162,203 162,203 162,203 Employee Leave Benefits 8,545 24,110 38,336 41,011 33,948 32,500 Loans Payable 4,046,557 3,572,974 4,108,241 3,819,979 3,531,717 3,243,456 Revenue Bonds Payable - - 5,334,385 5,329,062 5,182,577 5,050,589 General Obligation Bonds Payable - - - - - - Total Non Current Liabilities 4,217,305 3,759,287 9,643,165 9,352,255 8,910,445 8,488,748 Total Liabilities 4,742,984 6,022,960 10,804,448 10,594,330 10,268,967 10,065,237 NET POSITION Invested In Capital Assets, Net of Related Debt 53,547,080 52,110,480 54,700,611 60,824,782 61,837,121 61,939,759 Restricted for: Debt Service 720,768 731,596 873,536 964,182 Capital Projects 21,398 737,890 - Unrestricted 12,088,704 11,542,658 12,207,685 11,717,628 12,068,836 14,744,255 Total Net Position 65,657,182$ 64,391,028$ 67,629,064$ 73,274,006$ 74,779,493$ 77,648,196$ City of Auburn Sewer Comprehensive Plan Chapter 8 8-5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.1.3 Outstanding Debt Principal Table 8-3 outlines the City’s outstanding debt principal as of the end of 2013. The City of Auburn has one outstanding revenue bond and two outstanding Public Works Trust Fund loans. The total outstanding principal on these loans is $8.6 million. 8.2 Available Capital Funding Resources Feasible long-term capital funding strategies should be defined to ensure that adequate resources are available to fund the CIP identified in this Plan. In addition to the Utility’s resources such as accumulated cash reserves, capital revenues, bond proceeds, and system development charges (SDCs), capital needs can also be met from outside sources such as grants, low-interest loans, and bond financing. The following is a summary of internal Utility resources, government programs and resources, and public debt financing. 8.2.1 Internal Utility Resources Utility resources appropriate for funding capital needs include accumulated cash in the capital “account,” bond proceeds, and other capital revenues, such as SDCs. Capital-related revenues are discussed below. 8.2.1.1 Utility Funds and Cash Reserves User charges (rates) paid by the Utility’s customers are the primary funding source for all Utility activities. The rates cover total annual costs associated with operating and maintaining the sewer system. Rates can pay for capital improvement projects in two ways: either paying for debt service or directly paying for capital projects. Although funding the capital costs directly through rates does not result in the additional interest expense associated with issuing debt, this approach can cause large and/or volatile rate increases. 8.2.1.2 System Development Charges An SDC, as provided for by RCW 35.92.025, refers to a one-time charge imposed on new customers as a condition of connection to the utility system. The purpose of the SDC is twofold: (1) to promote equity between new and existing customers, and (2) to provide a source of revenue to fund capital projects. Equity is served by providing a vehicle for new customers to share the cost of infrastructure investment. SDC revenues provide a source of cash flow used to support utility capital needs; revenue can be used only to fund utility capital projects or to pay debt service incurred to finance those projects. In the absence of an SDC, growth-related capital costs would be borne in large part by existing customers. In addition, the net investment in the Utility already collected from existing customers, whether through rates, charges, and/or assessments, would be diluted by the addition of new customers, effectively subsidizing new customers with prior customers’ payments. To establish Table 8-3. City of Auburn Outstanding Debt Principal Debt Description Principal Outstanding Maturity Year 2010 CIP Revenue Bond $5,086,7602030 PW-06-962-003 $2,345,4332026 PW-04-691-001 $1,186,2842024 Total $8,618,477 Chapter 8 Auburn Sewer Comprehensive Plan Update 8-6 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx equity, an SDC should recover a proportionate share of the existing and future infrastructure costs from a new customer. From a financial perspective, a new customer should become financially equivalent to an existing customer by paying the SDC. Table 8-4 summarizes the City’s current SDC schedule. A recent SDC study has been completed and the City Council is currently evaluating the updated charges. 8.2.1.3 Local Facilities Charge While an SDC is the manner in which new customers pay their share of general facilities costs, local facilities funding is used to pay the cost of local facilities that connect each property to the system infrastructure. Local facilities funding is often overlooked in a rate forecast because it is funded up front either by connecting customers or developers, or through an assessment to properties—but never from rates. Although these funding mechanisms do not provide a capital revenue source toward funding CIP costs, a discussion of these charges is included in this chapter because of their impact on new customers. Several mechanisms can be considered toward funding local facilities. One of the following scenarios typically occurs: • the utility charges a connection fee based on the cost of the local facilities (under the same authority as the SDC) • a developer funds extension of the system to its development and turns those facilities over to the utility (contributed capital) • a local assessment is set up called a utility local improvement district (ULID), which collects tax revenue from benefited properties A local facilities charge (LFC) is a variation of the SDC authorized through RCW 35.92.025. It is a city- imposed charge to recover the cost related to service extension to local properties. Often called a front-footage charge and imposed on the basis of footage of main “fronting” a particular property, it is usually implemented as a reimbursement mechanism to a city for the cost of a local facility that directly serves a property. It is a form of connection charge and, as such, can accumulate up to 10 years of interest. It typically applies to instances where no developer-installed facilities are needed through developer extension because of the prior existence of available mains already serving the developing property. The developer extension is a requirement that a developer install onsite and sometimes offsite improvements as a condition of extending service. These are in addition to the SDC required and must be built to city standards. The city is authorized to enter into developer extension agreements under RCW 35.91.020. Part of the agreement between the city and the developer for the developer to extend service might include a latecomer agreement, resulting in a latecomer charge to new connections to the developer extension. Table 8-4. City of Auburn Current System Development Charge Schedule Type Sewer SDC Single Family Parcel $850 Per Parcel Other Parcels $850 Per RCE Note: A Residential Customer Equivalent (RCE) shall be as defined by the King County Department of Natural Resources. City of Auburn Sewer Comprehensive Plan Chapter 8 8-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Latecomer charges are a variation of developer extensions whereby a new customer connecting to a developer-installed improvement makes a payment to the city based on their share of the developer’s cost (RCW 35.91.020). The city passes this on to the developer that installed the facilities. This is part of the developer extension process, and defines the allocation of costs and records latecomer obligations on the title of affected properties. No interest is allowed, and the reimbursement agreement is in effect for a period of 20 years, unless a longer duration is approved by the city. ULID is another mechanism for funding infrastructure that assesses benefited properties based on the special benefit received by the construction of specific facilities (RCW 35.43.042). Most often used for local facilities, some ULIDs also recover related general facilities costs. Substantial legal and procedural requirements can make this process relatively expensive, and there are mechanisms by which a ULID can be rejected by a majority of property ownership within the assessment district boundary. 8.2.2 Government Programs and Resources This section outlines government programs and resources potentially available for financing. 8.2.2.1 Grants and Low-Cost Loans Overview Historically, federal and state grant programs were available to local utilities for capital funding assistance. However, these assistance programs have been mostly eliminated, substantially reduced in scope and amount, or replaced by loan programs. Remaining miscellaneous grant programs are generally lightly funded and heavily subscribed. Nonetheless, even the benefit of low-interest loans makes the effort of applying worthwhile. Grants and low-cost loans for Washington State utilities are available from various Washington State departments. There are many grant and loan programs that the City might be eligible for, described in greater detail below. 8.2.2.2 Department of Commerce A September 2014 document from the Washington State Department of Commerce summarizes various loan and grant programs available (“Summary of Some Grant and Loan Programs for Drinking Water and Wastewater Projects,” found at http://www.commerce.wa.gov/Documents/9-2- 14_multi-program_funding_program_summary.pdf). A few of those programs are described below. Community Economic Revitalization Board (CERB). CERB, a division of the Washington State Department of Commerce, primarily offers low-cost loans; grants are made available only to the extent that a loan is not reasonably possible. The CERB targets public facility funding for economically disadvantaged communities, specifically for job creation and retention. Priority criteria include the unemployment rates, number of jobs created and/or retained, wage rates, projected private investment, and estimated state and local revenues generated by the project. According to its website, “CERB funds a variety of projects that create jobs including (but not limited to) domestic and industrial water, storm and sewer projects, telecommunications and port facilities.” Eligible applicants include cities, towns, port districts, special purpose districts, federally recognized Indian tribes, and municipal corporations. Funding details for the 2013–15 Program are as follows per the Washington Commerce website: “$9 million was appropriated to CERB for the 2013-2015 Biennium. By state law, CERB must award 75 percent of this funding to projects in rural counties. The Board has also allocated $2,182,500 to be available for construction and planning grants on a first-come, first-served basis.” Chapter 8 Auburn Sewer Comprehensive Plan Update 8-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Program Funding Limitations Committed Private Sector Partner Construction • $2 million per project load award limit • Up to $300,000 or 50% of total award, whichever is less, may be grant funds. • 20% cash match required (minimum, percent of total project cost) Prospective Development Construction Available to rural communities only. • $2 million per project load award limit • Up to $300,000 or 50% of total award, whichever is less, may be grant funds. • 20% cash match required (minimum, percent of total project cost) Planning/Economic Feasibility Studies • $50,000 grant per project award limit • 25% cash match required (minimum, percent of total project cost) Further details are available at: • http://www.commerce.wa.gov/commissions/CommunityEconomicRevitalizationBoard/ • http://www.commerce.wa.gov/Documents/2013-15_Policies.pdf • http://www.commerce.wa.gov/commissions/CommunityEconomicRevitalizationBoard/Pages/CE RB-Traditional-Programs.aspx Public Works Board (PWB) Financial Assistance. The PWB’s overarching goal is to provide community access to financial and technical resources that help sustain local infrastructure. Cities, towns, counties, and special-purpose districts are eligible to receive financial assistance for qualifying projects. When funding is available, the following tools are accessible: • Construction Loan Program (http://www.pwb.wa.gov/financial- assistance/Construction/Pages/default.aspx): − Funding cycle: Per the PWB website, the governor’s proposed 2015–17 budget offers $69.7 million for 19 projects. − Program description: Low-interest loans for local governments to finance public infrastructure construction and rehabilitation. Eligible projects must improve public health and safety, respond to environmental issues, promote economic development, or upgrade system performance. − Terms: For non-distressed communities, a term of 5 years or less has an interest rate of 1.28 percent and a term from 6 to 20 years has an interest rate of 2.55 percent. • Pre-Construction Loan Program (http://www.pwb.wa.gov/financial-assistance/Pre- Construction/Pages/default.aspx): − Funding cycle: No funding has been allocated to the pre-construction loan program for the 2013–15 biennium. − Program description: Local governments may apply for low-interest loans to finance pre- construction activities to prepare a project for construction. − Terms: Terms are limited to a 5-year repayment period (the loan term may be converted to 20 years once the project has secured construction funding) with a 1 percent interest rate. • Emergency Loan Program (http://www.pwb.wa.gov/financial-assistance/Emergency- Loan/Pages/default.aspx): − Funding cycle: No funding has been allocated to the Emergency Loan Program for the 2013–15 biennium. − Program description: The Emergency Loan Program provides funding to address public- works emergencies, thereby helping to provide immediate restoration of critical public-works services and facilities. City of Auburn Sewer Comprehensive Plan Chapter 8 8-9 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx − Terms: Funds are limited to $500,000 per jurisdiction per biennium, and come with a 20- year term (or the life of the project), and a 3 percent interest rate. No local match is required. Further general resources are available at: • http://www.pwb.wa.gov/financial-assistance/Pages/default.aspx • http://www.pwb.wa.gov/Documents/FINAL-MASTER-GUIDELINES.pdf • http://www.commerce.wa.gov/Documents/9-2-14_multi- program_funding_program_summary.pdf 8.2.2.3 Department of Ecology: Integrated Water Quality Funding Program This year, Ecology received 227 applications requesting more than $352 million in financial assistance. Ecology is proposing grant and loan funding for 165 projects totaling approximately $229 million. • State Water Pollution Control Revolving Fund and Centennial Clean Water Program − Design projects associated with publicly owned wastewater and stormwater facilities. The integrated program also funds planning and implementation of nonpoint source pollution control activities. Terms for State fiscal year 2016 include either 2.4 percent interest for a 6–20 year term or 1.2 percent for 5-year term loans. Forgivable loan principal terms are available for distressed communities. − Further general resources are available at: http://www.ecy.wa.gov/programs/wq/funding/cycles/FY2016/index.html 8.2.3 Public Debt Financing This section describes potentially available public debt financing tools. 8.2.3.1 General Obligation Bonds General obligation (GO) bonds are bonds secured by the full faith and credit of the issuing agency, committing all available tax and revenue resources to debt repayment. With this high level of commitment, GO bonds have relatively low interest rates and few financial restrictions. However, the authority to issue GO bonds is restricted in terms of the amount and use of the funds, as defined by Washington constitution and statute. Specifically, the amount of debt that can be issued is linked to assessed valuation. RCW 39.36.020 states: (ii) Counties, cities, and towns are limited to an indebtedness amount not exceeding one and one-half percent of the value of the taxable property in such counties, cities, or towns without the assent of three-fifths of the voters therein voting at an election held for that purpose. (b) In cases requiring such assent counties, cities, towns, and public hospital districts are limited to a total indebtedness of two and one-half percent of the value of the taxable property therein. While bonding capacity can limit availability of GO bonds for utility purposes, these can sometimes play a valuable role in project financing. A rate savings may be realized through two avenues: the lower interest rate and related bond costs, and the extension of repayment obligation to all tax- paying properties (not just developed properties) through the authorization of an ad valorem property tax levy. Chapter 8 Auburn Sewer Comprehensive Plan Update 8-10 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.2.3.2 Revenue Bonds Revenue bonds are commonly used to fund utility capital improvements. The debt is secured by the revenues of the issuing utility and the debt obligation does not extend to the city’s other revenue sources. With this limited commitment, revenue bonds typically bear higher interest rates than GO bonds and also require security conditions related to the maintenance of dedicated reserves (a bond reserve) and financial performance (added bond debt service coverage). The City agrees to satisfy these requirements by ordinance as a condition of bond sale. Revenue bonds can be issued in Washington without a public vote. There is no bonding limit, except perhaps the practical limit of the utility’s ability to generate sufficient revenue to repay the debt and provide coverage. In some cases, poor credit might make issuing bonds problematic. 8.2.4 Capital Resource Funding Summary An ideal funding strategy would include the use of grants and low-cost loans when debt issuance is required. However, these resources are very limited and competitive in nature and do not provide a reliable source of funding for planning purposes. It is recommended that the City pursue these funding avenues but assume bond financing to meet needs above the Utility’s available cash resources. GO bonds may be useful for special circumstances, but because bonding capacity limits are most often reserved for other City (non-Utility) purposes, revenue bonds are a more secure financing mechanism for Utility needs. The Capital Financing Strategy developed to fund the updated CIP follows the funding priority below: 1. Available grant funds and/or developer contributions 2. Interest earnings on allocated fund balances 3. Other miscellaneous capital resources 4. Annual revenue collections from SDCs 5. Annual transfers of rate-funded capital or excess cash (above minimum balance targets) from operating accounts 6. Accumulated capital cash reserves 7. Revenue bond financing The 20-year CIP is expected to be funded from cash reserves and non-debt capital revenues. 8.3 Financial Plan The City of Auburn’s Sewer Utility is an enterprise fund that is responsible for funding all of its related costs. It is not dependent upon general tax revenues or general fund resources. The primary source of funding for the Utility is collections from sewer service charges. The City controls the LOS charges by ordinance and, subject to statutory authority, can adjust user charges as needed to meet financial objectives. The financial plan can provide a qualified assurance of financial feasibility only if it considers the “total system” costs of providing sewer service—both operating and capital. To meet these objectives, the following elements are completed: • Capital funding plan: The capital funding plan identifies the total CIP obligations for the planning period 2014–35, although the capital plan identified in this Plan begins with 2016. The capital funding plan defines a strategy for funding the CIP including an analysis of available resources from rate revenues, existing reserves, SDCs, debt financing, and any special resources that may be readily available (e.g., grants, developer contributions, etc.). The capital funding plan may impact the financial plan through use of debt financing (resulting in annual debt service) and the City of Auburn Sewer Comprehensive Plan Chapter 8 8-11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx assumed rate revenue resources available for capital funding. The capital funding plan is discussed in Section 8.3.3. • Financial forecast: This forecast identifies annual non-capital costs associated with the operation, maintenance, and administration of the sewer system. Included in the financial plan is a reserve analysis that forecasts cash flow and fund balance activity along with testing for satisfaction of actual or recommended minimum fund balance policies. The financial plan ultimately evaluates the sufficiency of Utility revenues in meeting all obligations, including operating expenses, debt service, and reserve contributions, as well as any debt service coverage requirements associated with long-term debt. The financial forecast analysis is discussed in Section 8.4. 8.3.1 Utility Fund Structure The City tracks the Utility’s revenues and expenditures in two funds: Fund 431 Sewer and Fund 433 Sewer Metro. The revenues and expenditures of both funds are included in the “combined” financial forecast. Conceptually, Utility expenditures can be divided into three main types of costs: operating, capital, and debt service. For modeling purposes, the “combined” sewer utility is split among three “accounts” as is bulleted below: operating, capital, and debt reserves. Municipal utilities commonly maintain separate operating, capital, and debt reserves. The initial allocation of the beginning fund balance is discussed in Section 8.4. • Operating: Serves as an operating account where operating revenues are deposited and operating expenses are paid. • Capital: Serves as a capital account where capital revenues are deposited and capital expenditures are paid. Examples of capital revenues include SDCs, grant proceeds, debt proceeds, and contributions from rates. • Debt reserves: Serves as a restricted account set up to comply with debt covenants. Splitting the funds into three separate “accounts” allows the City to apply the City’s and industry standard reserve targets to each account. Minimum balance thresholds for these accounts are discussed in the next section. 8.3.2 Financial Policies A brief summary of the City’s adopted and or recommended financial policies follows below. Adopted policies are based on the City’s “Process/Policies” section within the 2015–16 budget. 8.3.2.1 Reserve Policies Utility reserves serve multiple functions; they can be used to address variability and timing of expenditures and receipts; occasional disruptions in activities, costs, or revenues; and meeting utility debt obligations. The collective use of individual reserves helps to limit the City’s exposure to revenue shortfalls, meet long-term capital obligations, and reduce the potential for bond coverage defaults. • Operating reserve: An operating reserve is designed to provide a liquidity cushion; it protects the utility from the risk of short-term variation in the timing of revenue collection or payment of expenses. Like other types of reserves, operating reserves also serve another purpose: they help to smooth rate increases over time. Target funding levels for an operating reserve are generally expressed as a certain number of days of M&O expenses, with the minimum requirement varying with the expected revenue volatility. Industry practice for utility operating reserves ranges from 30 days (8 percent) to 120 days (33 percent) of M&O expenses, with the lower end more appropriate for utilities with stable revenue streams and the higher end of the range more Chapter 8 Auburn Sewer Comprehensive Plan Update 8-12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx appropriate for utilities with significant seasonal or consumption-based fluctuations (such as most water utilities). The City’s adopted policy states that the Sewer Utility’s target operating reserves should be approximately 60 days (page 36, “Process/Policies”). This is the target used in the financial forecast. Based on the City’s 2015 budgeted local expenditures (excluding depreciation and the King County Metro remittance), a 60-day target equates to $1.1 million in 2015. • Capital contingency reserve: A capital contingency reserve is an amount of cash set aside in case of an emergency should a piece of equipment or a portion of the Utility’s infrastructure fail unexpectedly. Additionally, the reserve could be used for other unanticipated capital needs including capital project cost overruns. There are various approaches to identifying an appropriate level for this reserve, such as (1) identifying a percentage of a utility system’s total fixed assets, and (2) determining the cost of replacing highly critical assets or facilities. Following common industry practice, this analysis assumes a minimum capital fund balance equal to 1 percent of the original cost of plant in service. • Bond reserve: Bond covenants often establish reserve requirements as a means of protecting an agency against the risk of nonpayment. This bond reserve can be funded with cash on hand, but is more often funded at the time of borrowing as part of the bond principal. A reserve amount equal to annual bonded debt service is targeted. 8.3.2.2 System Reinvestment Policies The purpose of system reinvestment funding is to provide for the replacement of aging system facilities to ensure sustainability of the system for ongoing operation. Each year, the Utility’s assets lose value, and as they lose value they are moving toward eventual replacement. That accumulating loss in value and future liability is typically measured for reporting purposes through annual depreciation expense. This is based on the original cost of the asset divided by its anticipated useful life. While this expense reflects the consumption of the existing asset and its original investment, the replacement of that asset will likely cost much more, after factoring in inflation and construction conditions. Therefore, the added annual replacement liability is often even greater than the annual depreciation expense. It is prudent to establish a system reinvestment policy that attempts to recover at least a portion of the annual depreciation expense. The City’s adopted policy is to phase in system reinvestment funding over 10 years in 10 percent increments beginning in 2012. To keep rates at their currently adopted levels through 2017, the system reinvestment strategy for the financial plan begins in 2015 at 10 percent and increases by 10 percent per year until 100 percent of the target is funded. 8.3.2.3 Debt Policies Bond covenants often establish a minimum debt coverage ratio as a means of protecting an agency against the risk of nonpayment. The industry’s standard minimum coverage ratio is 1.25 times annual revenue bond debt service. The City’s policy matches this industry standard. The City also identifies another debt level related policy, which is to maintain a capital ratio of 50 percent debt to 50 percent equity. The industry standard is a maximum of 60 percent debt to 40 percent equity. The City’s capital ratio from the 2013 financial statement was well below that threshold at approximately 12 percent debt to 88 percent equity. The forecast estimates that the debt level will not exceed 12 percent debt in the 20-year planning period. 8.3.3 Capital Funding Plan The CIP developed for this Plan contains 10 different projects valued at $33 million ($49 million inflated) over the 2016–35 planning period. Capital expenditures for 2014 and 2015 are based on City of Auburn Sewer Comprehensive Plan Chapter 8 8-13 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx estimated and budgeted amounts, respectively. Costs are stated in 2014 dollars and are escalated to the year of planned spending at an annual inflation rate of 3.5 percent per year. Table 8-5 summarizes the expected annual capital expenditures. A capital funding plan is developed to determine the total resources available to meet the CIP needs and determine if new debt financing will be required. After allocating the estimated beginning 2015 fund balance first to the debt reserve and secondly to the operating reserve, nearly $9 million was available for capital. The SDC is projected to generate an average annual revenue stream of just over $630,000 through 2021. This is based on an assumed customer growth rate of 2 percent per year. The customer growth percentage is drawn from a review of the previous 8 years of actual customer growth (2008– 15). The SDC revenue projection assumes the current SDC of $850 plus an annual Construction Cost Index adjustment starting in 2015. The City Council is currently reviewing an update of the SDCs. A summary of the capital funding plan is summarized in Table 8-6. The analysis shows that the CIP can be fully funded using cash reserves and non-debt capital revenue; no new debt is required. Table 8-5. City of Auburn Sewer CIP Year 2014 $Inflated $ 20142,405,393$ 2,405,393$ 20152,300,934$ 2,381,467$ 20162,490,000$ 2,667,350$ 20171,780,200$ 1,973,740$ 20182,415,200$ 2,771,498$ 2019 883,200$ 1,048,965$ 20203,165,200$ 3,890,839$ 2021 856,200$ 1,089,326$ 8 Year Total 16,296,327$ 18,228,576$ 2022-203521,181,000$ 35,231,899$ Grand Total 37,477,327$ 53,460,475$ Table 8-6. City of Auburn Capital Financing Plan Year Capital Expenditures Capital Expenditures Inflated Revenue Bond Financing Cash Funding Total Financial Resources 20142,405,393$ 2,405,393$ -$ 2,405,393$ 2,405,393$ 20152,300,934 2,381,467 - 2,381,467 2,381,467 20162,490,000 2,667,350 - 2,667,350 2,667,350 20171,780,200 1,973,740 - 1,973,740 1,973,740 20182,415,200 2,771,498 - 2,771,498 2,771,498 2019883,200 1,048,965 - 1,048,965 1,048,965 20203,165,200 3,890,839 - 3,890,839 3,890,839 2021856,200 1,089,326 - 1,089,326 1,089,326 8-Year Total 16,296,327$ 18,228,576$ -$ 18,228,576$ 18,228,576$ 2022-203521,181,000$ 35,231,899$ -$ 35,231,899$ 35,231,899$ Grand Total 37,477,327$ 53,460,475$ -$ 53,460,475$ 53,460,475$ Chapter 8 Auburn Sewer Comprehensive Plan Update 8-14 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.4 Financial Forecast The financial forecast, or revenue requirement analysis, forecasts the amount of annual revenue that needs to be generated by rates throughout the 2015–21 planning period. The analysis incorporates operating revenues, M&O expenses, debt service payments, rate-funded capital needs, and any other identified revenues or expenses related to utility operations, and determines the sufficiency of the current level of rates. Revenue needs are also impacted by debt covenants (typically applicable to revenue bonds) and specific fiscal policies and financial goals of the Utility. For this analysis, two revenue sufficiency “tests” have been developed to reflect the financial goals and constraints of the Utility: (1) cash needs must be met, and (2) debt coverage requirements must be realized. In order to operate successfully with respect to these goals, both tests of revenue sufficiency described below must be met. 8.4.1 Cash Flow Test The cash flow test identifies all known cash requirements for the Utility in each year of the planning period. Capital needs are identified and a capital funding strategy is established. This may include the use of debt, cash reserves, outside assistance, and rate funding. Cash requirements to be funded from rates are determined. Typically, these include M&O expenses, debt service payments, system reinvestment funding or directly funded capital outlays, and any additions to specified reserve balances. The total annual cash needs of the Utility are then compared to total operating revenues (under current rates) to forecast annual revenue surpluses or shortfalls. 8.4.2 Coverage Test The coverage test is based on a commitment made by the City when issuing revenue bonds. As a security condition of issuance, the City is required per covenant to agree that the revenue bond debt would have a higher priority for payment (a senior lien) compared to most other Utility expenditures; the only outlays with a higher lien are M&O expenses. Debt service coverage is expressed as a multiplier of the annual revenue bond debt service payment. For example, a 1.0 coverage factor would imply that no additional cushion is required. A 1.25 coverage factor means revenues must be sufficient to pay M&O expenses, annual revenue bond debt service payments, plus an additional 25 percent of annual revenue bond debt service payments. The excess cash flow derived from the added coverage, if any, can be used for any Utility purpose, including funding capital projects. The existing coverage requirement policy on the City’s outstanding revenue bonds is 1.25 times bond debt. In determining the annual revenue requirement, both the cash and coverage sufficiency tests must be met—the test with the greatest deficiency drives the level of needed rate increase in any given year. The financial forecast projects the amount of operating and capital expenditures to determine the annual amount of revenue required. The objective of the financial forecast is to evaluate the sufficiency of the current level of rates in meeting the total revenue requirements of the system. In addition to annual operating costs, the revenue of the Utility must also meet debt covenant requirements and minimum reserve level targets. 8.4.3 Financial Forecast The financial forecast is developed from the City’s adopted 2015–16 biennial budget documents along with other key factors and assumptions to develop a portrayal of the Utility’s annual financial obligations. The forecast covers the 2015–21 planning period. The following is a list of the key revenue and expense factors and assumptions used to develop the forecast. City of Auburn Sewer Comprehensive Plan Chapter 8 8-15 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.4.3.1 Revenue and Fund Balance Assumptions The following revenue and fund balance assumptions are used to develop the forecast: • Customer growth and demand: Based on a review of historical data from 2008 to 2015, annual customer account growth has averaged approximately 2 percent. To be consistent with the Water financial forecast, annual water use per account is projected to decline by 1 percent per year until 2027. Because the residential rate structure is flat, the decline in usage in that class would not affect rate revenues. Therefore, the 1 percent decline applies only to the variable portion of sewer rate revenues. The net effect of 2 percent customer account growth and 1 percent decline in non-residential usage per account results in a composite rate revenue increase of 1.5 percent per year. • Adopted rate increases: The City has adopted annual rate increases through 2017 of roughly 2.5 percent, which are incorporated into the revenue figures within the forecast. The analysis shows that through 2017, no additional rate increases are needed above the adopted levels. • Miscellaneous revenues are conservatively assumed to stay at their currently budgeted levels. Miscellaneous revenues include late penalties, sewer applications, etc. The Build America Bonds (BAB) subsidy for the 2010 Revenue Bond is expected to gradually decline in proportion to the annual decline in interest expense. • Fund balances are based on the estimated beginning balance in 2015 for Fund 431. This balance was allocated to the “accounts” using the following methodology: 1. Debt reserve: amount equal to highest annual bonded debt service on existing debt 2. Operating reserve: amount equal to the operating reserve target of 60 days 3. Capital reserve: remaining funds The estimated beginning fund balance in 2015 was approximately $10.8 million, which is enough to fully fund the debt reserve, and provide 60 days in the operating reserve, leaving nearly $9 million to fund the capital reserve. The fund balance for Fund 433 (Sewer Metro reserve) remains in that fund and is not used in this financial forecast. 8.4.3.2 Expenditures and Other Miscellaneous Assumptions The following expenditures and other miscellaneous assumptions are used to develop the forecast: • Interest earnings initially assume a rate of 0.09 percent applied to beginning-of-year cash balances based on existing Local Government Investment Pool rates, phasing toward 0.25 percent over the long term. • General operating expenses are escalated from the budgeted figures at 2.5 percent per year, labor costs increase at 2.5 percent per year, and benefits at 5.5 percent per year. • State taxes are calculated based on prevailing tax rates. • Existing debt service schedules were provided by the City and include one existing revenue bond issue as well as two Public Works Trust Fund loans. These obligations represent nearly $728,000 in annual debt service as of 2015. • The King County Metro charges were modeled as a “pass through”—revenues equal to expenditures. Metro Service revenues were calculated using each year’s estimated number of residential customer equivalents (RCEs) and the corresponding year’s monthly service charge. Projected monthly charges were based on the County’s estimated rate schedule through 2020, with inflationary adjustments assumed beyond 2020. Industrial surcharges were increased at the same rate as the monthly service charge. • This Plan identifies additional staffing needs above the 2015 and 2016 budgeted levels, which total over $232,000 per year beginning in 2017: Chapter 8 Auburn Sewer Comprehensive Plan Update 8-16 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx − Asset management specialist (0.5 FTE): salary and benefits of $46,000 per year (note: the other 0.5 FTE is to be included within the City’s Storm Drainage Utility) − Maintenance worker II (1 FTE): salary and benefits of $93,000 per year − Maintenance worker II (1 FTE): salary and benefits of $93,000 per year • The rate strategy focuses on the 2015–21 planning period. It is imperative that the City review the proposed rates and rate assumptions annually to ensure that the rate projections developed remain adequate. Any significant changes should be incorporated into the financial plan and future rates should be adjusted as needed. Table 8-7 summarizes the annual revenue requirement through 2021 based on the forecast of revenues, expenditures, fund balances, fiscal policies, and capital funding. In 2012, the City Council adopted annual rate increases of 2.5 percent in each of 2015, 2016, and 2017. The financial analysis shows that the adopted rates generate sufficient revenue to meet operating expenses and the Utility policy goals as discussed herein for the 2015–17 period. Based on the assumptions in the forecast, no incremental rate increases (above adopted amounts) are needed through 2017. Rate increases averaging about 3.3 percent per year are needed in 2018 and beyond to cover projected M&O expenses, debt service payments, system reinvestment funding, and other stated financial policy objectives. The last two rows of Table 8-7 show the projected debt service coverage for both bonded debt and total debt. Bonded debt service coverage—which legally cannot drop below 1.25—is projected to stay at or above 5.8 throughout the life of the forecast. Debt service coverage for total debt (including state loans) is recommended to be at least 1.0, and throughout the life of this forecast, it is projected to stay at or above 3.4. Table 8-7. City of Auburn Financial Forecast Revenue Requirements 20142015201620172018201920202021 Assuming Existing Rates: Revenue Local Rate Revenues 7,428,178$ 7,729,650$ 8,042,305$ 8,366,484$ 8,491,446$ 8,618,273$ 8,746,995$ 8,877,640$ Non-Rate Revenues + KC Metro Sewer 15,957,246 16,446,729 16,759,701 18,162,930 18,840,675 19,570,948 20,318,501 21,214,937 Total Revenue 23,385,424$ 24,176,380$ 24,802,006$ 26,529,415$ 27,332,121$ 28,189,221$ 29,065,496$ 30,092,577$ Expenses Cash Operating Expenses 22,580,466$ 23,073,590$ 23,212,150$ 25,130,173$ 26,032,966$ 26,998,699$ 27,989,485$ 29,146,421$ Existing Debt Service 730,191 728,283 727,038 817,610 815,874 814,887 813,347 811,255 New Debt Service - - - - - - - - Rate-Funded System Reinvestment - 157,565 323,428 471,687 640,778 822,550 992,282 1,203,542 Additions to Operating Reserve - - - - 36,606 38,226 35,922 45,855 Total Expenses 23,310,657$ 23,959,438$ 24,262,616$ 26,419,470$ 27,526,224$ 28,674,362$ 29,831,036$ 31,207,072$ Cash Surplus / (Deficiency) - Before Rate Increases 74,767$ 216,942$ 539,389$ 109,945$ (194,104)$ (485,140)$ (765,540)$ (1,114,495)$ Annual Rate Adjustment 0.00%0.00%0.00%2.54%3.62%3.26%3.85% Cumulative Annual Rate Adjustment 0.00%0.00%0.00%2.54%6.25%9.71%13.94% After Rate Increases: Local Rate Revenues 7,428,178$ 7,729,650$ 8,042,305$ 8,366,484$ 8,706,904$ 9,156,786$ 9,596,757$ 10,114,747$ Cash Surplus / (Deficiency) - After Rate Increases 74,800 216,900 539,400 109,900 36,600 38,200 35,900 45,900 Debt Service Coverage - Revenue Bonds 5.826.727.986.426.727.187.638.20 Debt Service Coverage - All Debt 3.383.914.664.054.254.554.845.21 City of Auburn Sewer Comprehensive Plan Chapter 8 8-17 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.4.4 City Funds and Reserves Balances Table 8-8 shows a summary of the projected ending City operating, capital, and debt reserve balances through 2021. The operating reserve ends at 60 days of operating expenditures; the capital reserve ends at $3.3 million, which is above the minimum target of $1.1 million; and the debt reserve ends at $0.5 million, which is enough to cover 1 year of annual bonded debt service. 8.5 Existing Rate Structure and Projected Schedule The City’s existing sewer rate structure for inside City customers is composed of two rate classes. The residential rate schedule consists of a monthly base charge. The non-residential rate schedule consists of both a monthly base charge and a volume charge based upon the amount of water used as measured in 100-cubic-foot (ccf) increments above the initial allowance. Residential sewer utility customers residing outside of the City’s political boundaries are assessed charges based upon the inside City rate plus a 50 percent premium (ACC 13.06.360). Low-income single-family residential customers are provided a 50 percent discount to the rates presented. To qualify for a low-income discount, a customer must be 62 years old or older and meet low-income guidelines as defined by the U.S. Department of Housing and Urban Development (ACC 13.24). A recent detailed review of the City’s rate structure has been completed in the 2014 Retail Rate Study. The review recommended increasing the volume charge while maintaining the current base charge through 2017. This phases the existing rate structure toward a more standard definition of 7.5 ccf of implicit usage included in the monthly base charge. Table 8-9 presents the City’s existing sewer rate schedule for each customer class under the adopted rates through 2017 (no rate increases above adopted levels are necessary through 2017). The table then incorporates necessary rate increases starting in 2018 and continuing through 2021. Table 8-8. City of Auburn Cash Balance Summary Ending Reserves 20142015201620172018201920202021 Operating 1,139,255$ 1,132,900$ 1,101,349$ 1,188,469$ 1,225,076$ 1,263,302$ 1,299,223$ 1,345,078$ Capital 9,487,763 7,686,286 6,496,031 5,627,941 4,139,325 4,586,275 2,399,129 3,258,276 Debt 516,173 516,173 516,173 516,173 516,173 516,173 516,173 516,173 Total 11,143,190$ 9,335,358$ 8,113,553$ 7,332,583$ 5,880,574$ 6,365,749$ 4,214,525$ 5,119,527$ Chapter 8 Auburn Sewer Comprehensive Plan Update 8-18 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.6 Affordability The Washington State Department of Health and Public Works Board has historically used an affordability index to prioritize low-cost loan awards. The typical threshold looks at whether a system’s rates exceed 1.5 to 2.0 percent of the median household income for the demographic area. As a result, if monthly bills are less than 1.5 percent of the median household income for the demographic area, they are generally considered affordable. According to City staff, the median household income for the city of Auburn in 2012 was $49,996. This figure was inflated to $51,810 at 2014 levels assuming annual Consumer Price Index adjustments. Table 8-10 presents the City’s estimated single-family sewer rate with the projected rate increases for the forecast period. The affordability mark (monthly bill*12 ÷ median income) averages 0.5 percent throughout the study period. As shown in Table 8-10, the City’s local sewer rates remain well within the affordability range throughout the planning period. If the County’s monthly charge is included in this calculation, the affordability mark averages 1.5 percent. Table 8-9. City of Auburn Projected Local Rate Schedule Monthly Rate Schedule AdoptedAdoptedAdoptedAdopted ProjectedProjectedProjectedProjected 20142015201620172018201920202021 Annual:0.0%0.0%0.0%2.5%3.6%3.3%3.8% Cumulative:0.0%0.0%0.0%2.5%6.2%9.7%13.9% Residential Base $23.12$23.69$24.29$24.89$25.52$26.45$27.31$28.36 Non-Residential Base (first 750 cf)$23.12$23.69$24.29$24.89$25.52$26.45$27.31$28.36 Volume (additional 100 cf)$2.34$2.39$2.45$2.52$2.58$2.68$2.76$2.87 Low Income Discount: 50% Outside City Multiplier: 1.50 King County Metro Rates Not Included in Rate Forecast Rate Increases shown in 2015, 2016, and 2017 reflect already-adopted annual increases of 2.5% Table 8-10. City of Auburn Affordability Test Year Inflation Median HH Income Projected Monthly Bill (Local Only) % of Median HH Income 20142.50%$51,810$23.120.54% 2015 2.50%$53,106$23.690.54% 2016 2.50%$54,433$24.290.54% 2017 2.50%$55,794$24.890.54% 2018 2.50%$57,189$25.520.54% 2019 2.50%$58,619$26.450.54% 2020 2.50%$60,084$27.310.55% 2021 2.50%$61,586$28.360.55% Note: Monthly Bill assumes residential local rate only. City of Auburn Sewer Comprehensive Plan Chapter 8 8-19 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 8.7 Conclusion The financial analysis indicates that the adopted rates in 2015, 2016, and 2017 are sufficient to meet the Utility financial obligations as presented herein. No additional rate increases are proposed for 2015–17. Based on the forecast, required rate increases for 2018–21 average about 3.3 percent per year for a cumulative rate increase of 13.9 percent. The financial forecast shows that no new debt is expected to be required to fund the identified capital program within this Plan. This evaluation also finds that the local sewer rates with projected rate increases would remain within the defined threshold of affordability. 9-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 9 Implementation Plan Building upon the M&O activities outlined in Chapter 6 and the projects described in Chapter 7 , this chapter presents a work plan for future Utility activities. Critical elements of the plan (e.g., CIP implementation and criticality-based maintenance plans) are presented and a planning-level schedule is provided to guide the Utility’s activities in the coming years. For discussion, plan implementation is divided into two sections: • presentation of the CIP for both 6- and 20-year time frames • description of the steps forward in order to implement the activities described in this chapter. Funding for these activities is described in a separate rate analysis study prepared in conjunction with the overall Sewer Plan. The timeline at the conclusion of this chapter shows the proposed implementation schedule. 9.1 6-Year and 20-Year CIP The 6-year CIP contains projects identified by the City as requiring immediate action. The 6-year CIP also contains general improvement projects allowing for annual R&R of facilities in the next 6 years. Details regarding these projects are provided in Chapter 7. The 6-year CIP is shown in Table 9-1. Table 9-1. Annual Project Cost Summary for 6-Year CIP (in millions of dollars) Project number Project name Priority 2016 2017 2018 2019 2020 2021 6-year project cost 1 Sanitary Sewer Repair and Replacement/System Improvements 1 $1.873 $0.300 $1.500 $0.300 $1.500 $0.300 $5.773 2 Street Utility Improvements 1 $0.200 $0.200 $0.200 $0.200 $0.200 $0.200 $1.200 3 Vactor Decant Study 1 $0.150 $0.000 $0.000 $0.000 $0.000 $0.000 $0.150 4 Sewer Pump Station Replacement/Improvement 1 $0.000 $0.141 $0.500 $0.168 $0.900 $0.141 $1.850 5 Siphon Assessment 1 $0.000 $0.524 $0.000 $0.000 $0.000 $0.000 $0.524 6 Pump Station Condition Assessment 1 $0.187 $0.000 $0.000 $0.000 $0.000 $0.000 $0.187 7 Manhole Ring and Cover Replacement 2 $0.080 $0.080 $0.080 $0.080 $0.080 $0.080 $0.480 8 Cleaning and Inspection of Large-Diameter Pipe 2 $0.000 $0.400 $0.000 $0.000 $0.000 $0.000 $0.400 9 Inflow and Infiltration Study 3 $0.000 $0.135 $0.135 $0.135 $0.135 $0.135 $0.676 10 Plan Update 1 $0.000 $0.000 $0.000 $0.000 $0.350 $0.000 $0.350 Total 6-year CIP cost for priority 1 projects $2.410 $1.165 $2.200 $0.668 $2.950 $0.641 $10.034 Total 6-year CIP cost for priority 2 projects $0.080 $0.480 $0.080 $0.080 $0.080 $0.080 $0.880 Total 6-year CIP cost for priority 3 projects $0.000 $0.135 $0.135 $0.135 $0.135 $0.135 $0.676 Total 6-year CIP cost $2.490 $1.780 $2.415 $0.883 $3.1615 $0.856 $11.590 Chapter 9 City of Auburn Comprehensive Sewer Plan 9-2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx The CIP after the 6-year time period includes ongoing programmatic efforts to develop projects for facility repair or replacement, including projects based on the City’s asset management tools. The projects proposed for expenditures in the years 2022 to 2035, and an estimate of total CIP costs for the 20-year period from 2014 through 2035, are shown in Table 9-2. Table 9-2. Cost Summary for 20-Year CIP (in millions of dollars) Project number Project name Priority Project costs for 2022–35 (2014 dollars) 1 Sanitary Sewer Repair and Replacement/System Improvements 1 $12.600 2 Street Utility Improvements 1 $2.800 3 Vactor Decant Study 1 $0.000 4 Sewer Pump Station Replacement/Improvement 1 $2.850 5 Siphon Assessment 1 $0.524 6 Pump Station Condition Assessment 1 $0.187 7 MH Ring and Cover Replacement 2 $1.120 8 Cleaning and Inspection of Large-Diameter Pipe 2 $0.400 9 Inflow and Infiltration Study 3 $0.000 10 Plan Update 1 $0.700 Total 2022–35 CIP cost for priority 1 projects $19.661 Total 2022–35 CIP cost for priority 2 projects $1.520 Total 2022–35 CIP cost for priority 3 projects $0.000 Total 2022–35 CIP cost $21.181 Total 20-year CIP cost $32.771 9.2 Monitoring The King County flow monitoring and hydraulic modeling completed as part of this Sewer Plan identified areas with high levels of I/I. As discussed in Section 5.2, the levels of I/I are not currently problematic. However, it is recommended the City initiate the first steps of an I/I control program (CIP project 9, Section 6.2) to proactively address potential concerns. The first step in the program is to select flow metering locations. The budget of CIP project 9 assumed four flow monitors and two rain gauges for six months per year. The suggested initial flow monitoring locations (manhole IDs) for year 1 of CIP project 9 are: • 410-77 • 611-34 • 611-08 • 610-30 The hydraulic characteristics of exact locations should be examined prior to placement of flow meters to maximize flow metering accuracy. The City should also use the recently upgraded SCADA system to compile pump station pump run times and corresponding wet well levels. City of Auburn Comprehensive Sewer Plan Chapter 9 9-3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 9.3 Asset Management and Maintenance and Operation Asset management is a defined process for managing facilities and activities that will optimize the life-cycle cost of Utility assets as well as to ensure that the Utility meets defined service levels. The economic life model developed for the 2009 Comprehensive Sewer Plan and the recently developed specification to migrate this model to Cartegraph is an example of a criticality-based approach to deciding the optimal timing for repair or replacement of existing utility facilities. This method can also be used for managing risks to the performance of sewers and force mains through maintenance strategies. It is recommended that the City continue the business practice of asset management. To help accomplish this, the City should fully populate its GIS information and implement the economic life model within Cartegraph. 9.3.1 Collect Asset Data The sanitary sewer system is a complex network of pipes and pump stations that collect and convey wastewater produced within the city to the King County collection system. Not all system attributes are currently included in the City’s CMMS database or GIS. Static attributes like material, size, and installation dates can be updated anytime and the condition of each asset should be updated following inspection. Figure 9-1 shows a map of the City’s sewer system (pipes) that have some of the static attribute information missing and that need to be updated. Please note that an indication that asset information is missing indicates that at least one particular attribute is not currently in the CMMS database. Generally, that information exists elsewhere in City archives (as-built drawings, etc.), but will be far more useful for managing the Utility’s assets when it has been compiled in the CMMS. Chapter 9 City of Auburn Comprehensive Sewer Plan 9-4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx GreenRiver LakeTapps BigSoos Cre e k MillCreek 167 18 AUBU R N W A Y S B S T N W 37TH ST NE WE S T V A L L E Y H W Y N W 15TH ST NW W MAIN ST K E R S E Y W A Y S E 53RD ST SE A U B U R N W A Y S SE 304TH ST SE 312TH ST 11 2 T H A V E S E C S T S W A S T S E ELLINGSON RD SW WhiteRiver 15TH ST SW PER I M E T E R R D S W CL A Y S T N W Lea HillSewer Basin South Hill Sewer Basin Valley SewerBasin King County Pierce County Auburn Way SouthSewer Basin West HillSewerBasin Pacific Dogwood Verdana Safeway Area 19 R Street F Street Auburn 40 Riverside8th Street North Tapps 22nd Street Auburn Jail Terrace View Rainier RidgePeasley Ridge Lakeland Hills Valley Meadows Ellingson Road Issac Evans Park Auburn Golf Course Auburn Justice Center Auburn Valley Humane Society COMPREHENSIVE SEWER PLAN March 2015 FIGURE 9-1SANITARY SEWERSWITH MISSING ATTRIBUTEINFORMATION 3,500 0 3,500 7,000 Feet N P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_4-2_ExistingWastewaterConveyanceSystem11x17.mxd L E G E N D Auburn Sewers with All Populated Information Auburn Sewers with Missing Information King County Sewers Auburn Pump Station King County Pump Station Private Pump Station City of Auburn Sewer Service Area Major Roads Street County line Streams/Rivers/Ponds AUBURNSSAMASK City of Auburn Comprehensive Sewer Plan Chapter 9 9-7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx 9.3.2 Criticality Criticality is determined based on the consequences of failure and the likelihood of the failure occurring. Factors that impact criticality include the age of the asset, repair history of the asset, and consequences, in terms of dollars, should a failure occur. Consequences of a system failure include such considerations as whether a failure impacts a hospital or school as compared to a residence or unoccupied property. Each asset is evaluated based on these likelihood and consequence factors and a numerical weighting assigned. The combination of these factors results in the assignment of a criticality value. Figure 9-2 depicts an example of assessing asset criticality values to a large collection system. The data on the figure are not specific to the City’s sanitary sewer system. Figure 9-2. Example of identifying asset criticality The points shown above are sample data and do not represent a specific evaluation of Auburn's sanitary sewer system. 9.3.3 Defining Maintenance Strategies As Figure 9-3 illustrates, an asset’s criticality can be used to determine the best maintenance strategy for that asset. There are four general maintenance strategies based on the risk carried by the asset and the specific maintenance strategy used should be assigned on an individual asset basis to ensure that the appropriate actions are being taken. Chapter 9 City of Auburn Comprehensive Sewer Plan 9-8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Figure 9-3. Maintenance strategies based on risk High-risk assets are identified as having both a high likelihood of failure and a high consequence of failure. These assets should be modified in order to mitigate this risk. Risk can be mitigated by adding redundancy to reduce the consequence of failure or by selecting a more robust type of asset that can perform the same function with a lower likelihood of failure. An example of this would be adding a redundant pump to a pump station to reduce the consequence of any one pump failing, or using a different type of pump to reduce the occurrence of clogs. Moderate-risk assets have been separated into two regions: high-likelihood/low-consequence assets and high-consequence/low-likelihood assets. The assets with a high likelihood of failure but a low consequence of failure should receive time-based maintenance care. This maintenance strategy includes preventive maintenance (PM) including inspection, calibration, oil changes, and tasks recommended by the manufacturer or other best practices. Corrective maintenance should also be conducted to address defects as they are revealed and the spare parts strategy should be prepared for the high incidence of failures. The frequency of these maintenance activities is driven by the economics of maintaining the asset; the cost of maintaining the asset should be in proportion with the cost of replacing the asset in order to optimize the life-cycle cost of asset. An example of a high-likelihood/low-consequence asset would be a ventilation fan in a pump station. The consequence of the fan failing may be relatively low and, as a result, expensive maintenance activities should not be performed on an inexpensive fan. Instead, performing routine PM to extend the life of the fan should be done at a frequency that is cost-effective and the fan should be replaced upon failure. Spare fans may be kept on hand or an on-call contract with a vendor may be used, if appropriate. The second region of moderate-risk assets are assets that have a high consequence of failure but are not very likely to fail. These assets should receive condition-based maintenance care. This maintenance strategy includes the same PM identified above but also includes predictive maintenance (PdM), which includes technologies and practices designed to evaluate assets in operation and, based on known failure modes, predict failures before they occur. PdM technologies include vibration monitoring, infrared detection, oil analysis, and other condition evaluative tools. Once these measures identify deteriorating condition, corrective maintenance activities should be City of Auburn Comprehensive Sewer Plan Chapter 9 9-9 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx taken to prevent a failure and the spare parts strategy should reflect that the high consequence of failure requires that these assets be non-functional for as short a period of time as possible. The frequency of these maintenance activities should be based on the condition of the asset; as the condition declines, more frequent maintenance efforts may be required. An example of a high-consequence/low-likelihood asset would be a new sewer line serving the City’s downtown area. The sewer may be relatively unlikely to fail, but the costs of a failure are such that preventing a failure is worth the cost of PdM activities. Standard PM such as jet cleaning may still be appropriate, but PdM activities such as monitoring the line via CCTV are appropriate to identify failures before they occur. Once a failure has been identified, the spare parts strategy should be such that the time for repair or replacement minimizes the loss of service to the City’s customers. This may mean keeping spare supplies on hand or having an on-call contract with a contractor for quick repairs. The assets with the lowest risk should receive only minimal, routine PM and most maintenance activities should be reactive. It may be expected to run these assets to failure as the consequences of failure are low. Because of the low consequence and likelihood of failure, replacements for these assets should be ordered rather than kept as spare parts in order to minimize costs. A sump pump in a pump station may have a low likelihood of failing and a low consequence in case of failure. Occasional routine maintenance may be conducted on sump pumps but in general, they are allowed to run to failure. Once they have failed, it may be more cost-effective to purchase a new sump pump “off the shelf” rather than rebuild the existing pump or carry spares. Table 9-3 summarizes the criticality-based maintenance strategies. Table 9-3. Criticality-Based Maintenance Strategy Summary Asset criticality Maintenance strategy Frequency basis Spare parts strategy Risk optimization High Engineer-out: mitigate risk by minimizing the likelihood and/or consequence of a failure None None Unacceptable risk Moderate (high-likelihood) Time-based: routine PM sustains the asset’s condition and extends its life Economic Prepare for high rate of failure Minimize risk Moderate (high-consequence) Condition-based: routine PM is supplemented with PdM to identify failures before they occur Asset condition Minimize downtime No unexpected failures Low Reactive: only minimal routine maintenance is done to sustain the asset’s condition Economic or as needed No spares Run to failure 9.3.4 Condition Assessments For the City’s roughly 5,500 pipe segments, PdM activities will require condition assessments of pipes through CCTV inspections. As with the maintenance strategies, the priority and frequency of CCTV inspections should be related to the relative criticality of the pipe being assessed. High- criticality pipes (those that are in the top 20 percent of the criticality scoring) should get the first priority in receiving inspections and subsequent inspections should be more frequent for these pipes than for less critical pipes. Moderate-criticality pipes (pipes that are in the next 30 percent of criticality scoring) should also receive inspections when available but should be on a less frequent recurring schedule than highly critical pipes. Low-criticality pipes should receive inspections only if the resources are available without hindering the inspection of high- and moderate-criticality pipes. After condition assessments have been completed, the results should be reentered into the criticality model to either update or confirm the criticality rating. Entering condition assessment data could Chapter 9 City of Auburn Comprehensive Sewer Plan 9-10 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx result in some pipes considered highly critical to be downgraded to moderately critical or could result in some pipes thought to be only moderately critical to become more critical. For example, currently there are two pipes crossing the Green River that should be included in the City’s next round of CCTV inspections. If the results of the inspection show that the pipes are in excellent condition, the pipes may be considered less critical and may not need to be reevaluated for a number of years. However, if the inspection shows that the pipes are in poor condition, more frequent inspection may be needed or including a replacement/lining of the pipes in the next CIP may be appropriate. 9.3.5 Continual Improvement Once asset criticality and the optimal maintenance strategy have been identified, continual reevaluation is important to ensure that the most appropriate strategy has been identified. This process includes reevaluating the likelihood and consequence factors to ensure that they accurately measure the risk an asset carries, recalculating each asset’s criticality to identify any changes since the last evaluation, and reviewing each asset’s maintenance and spare parts strategy to make certain that the appropriate level and frequency of activities are being performed. This continual improvement guarantees that the minimal life-cycle cost is being achieved for each of the City’s assets while still meeting the City’s desired LOS. 9.4 Discharge Quality Control The characteristics of sewage discharged to the collection system can have negative impacts on wastewater treatment and conveyance capability. Such discharges—which include rags, diapers, harmful chemicals, pharmaceuticals, and FOG—should be minimized to the maximum extent possible. 9.4.1 Control of Fats, Oils, and Greases Engineering currently employs a 0.25 FTE water resources technician to implement and oversee the City FOG Reduction Program. This program seeks to enforce the City’s code prohibiting the discharge of FOG by restaurants and other FSEs by requiring the submittal of a FOG control plan as a requirement to obtain a business license. The control plans must outline best management practices that will be taken by the business, such as dry-wiping plates, installing and/or regularly cleaning a grease trap or interceptor, and disposing of grease by recycling it or disposing of it with solid waste. It is recommended (see Section 7.6) that the City continues the current FOG Reduction Program if not expand it to include proactive inspections and public outreach activities. 9.4.2 Industrial Waste As applications for discharge permits are reviewed by City staff, activities, mainly industrial, that are likely to introduce chemicals or other materials to the sanitary sewer system, are identified. Applicants are directed to coordinate with the King County Wastewater Treatment Division’s Industrial Waste Program for the required level of discharge authorization for that activity. 9.4.3 Public Education The City should continue to educate the general public about what is appropriate to put in the sewer system. Continued use of bill stuffers, posters, general announcements, and other actions to inform the public about the harmful effects that some discharges have to the system is recommended. 9.5 Hazard Planning Auburn is situated in a geographic area where natural hazards exist. Specifically, the city’s proximity to the Green and White rivers presents the potential for flooding and nearby Mt. Rainier looms as a City of Auburn Comprehensive Sewer Plan Chapter 9 9-11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx volcanic and lahar hazard. In addition, the numerous faults present in the Puget Sound lowlands increase the likelihood of an earthquake. The Utility should understand the vulnerability of facilities to such natural hazards to be prepared for responding if such an event should occur. The City has prepared a Public Works Emergency Response Manual (see Section 7.4.2) to serve as a guide on how to handle emergency situations. An evaluation of sewer facilities for hazard planning purposes should be completed. The evaluation should identify the potential hazards for Auburn and assess the vulnerability of sewer facilities to the hazards. As a result of the evaluation, a plan outlining the hazards, facilities vulnerable to hazards, and activities for mitigating the risk associated with the hazards should be developed. 9.6 Maintenance Issues Maintenance crews have expressed several areas of concern that did not rise to the level of a CIP project based on currently available information. However, they merit additional investigations or research to improve LOS. 9.6.1 105th Place SE and Lea Hill Road SE The sewer running west down Lea Hill Road SE is very steep and then encounters the 8th Street siphon at the bottom of the hill. There have been odor issues/complaints at this site and it is possible that entrapped air is reducing the capacity of the pipe. 9.6.2 Sewers Crossing Freeway Three City-owned sewers cross underneath State Route 167 with both sides of the sewers located within wetlands. There is very limited access to these sewers and they have never been inspected. 9.6.3 Sewers within Easements Sewers that are located within easements, especially ones located in backyards of houses, are difficult to access. Either the sewers are physically constrained by fences or overgrown vegetation limits required access to the sewers for proper maintenance. 9.7 Schedule Figure 9-4 outlines the general schedule for CIP and monitoring over the next 6 years. Projects marked as potential activities are tasks that may be needed to address changing conditions or updated modeling. In cases of funding or resource scarcity, activities should be performed in the order of their impact on addressing the gap between the City’s expected LOS and the actual LOS being provided. Chapter 9 City of Auburn Comprehensive Sewer Plan 9-12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Project number Project name 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 6–Year CIP 7–20-Year CIP 1 Sanitary Sewer Repair & Replacement/System Improvements 2 Street Utility Improvements 3 Vactor Decant Study 4 Sewer Pump Station Replacement/Improvement 5 Siphon Assessment 6 Pump Station Condition Assessment 7 MH Ring and Cover Replacement 8 Cleaning and Inspection of Large-Diameter Pipe 9 Inflow and Infiltration Study 10 Plan Update Figure 9-4. City of Auburn Sewer Plan implementation timeline 10-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 10 Limitations This document was prepared solely for the City of Auburn in accordance with professional standards at the time the services were performed and in accordance with the contract between the City of Auburn and Brown and Caldwell dated December 6, 2013. This document is governed by the specific scope of work authorized by the City of Auburn it is not intended to be relied upon by any other party except for regulatory authorities contemplated by the scope of work. We have relied on information or instructions provided by the City of Auburn and other parties and, unless otherwise expressly indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information. 11-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Chapter 11 References Auburn City Code (ACC). 2014. http://www.codepublishing.com/wa/auburn/. City of Auburn Comprehensive Plan (Comp Plan). Amended 2008. City of Auburn. http://www.auburnwa.gov/doing_business/community_development/planning/comprehensive_plan.ht m King County, 2002. 2001/2002 Wet Weather Flow Monitoring; Regional Infiltration/ Inflow (I/I) Control Program. King county Department of Natural Resources and Parks, Wastewater Division. June 2002. Brown and Caldwell, December 2009. City of Auburn Comprehensive Sewer Plan. Prepared for the City of Auburn by Brown and Caldwell. City of Auburn Comprehensive Sewer Plan B-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Appendix A: Inter-local Agreements and Outside Agency Correspondence RESOLUTION NO 3589 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BETWEEN THE CITY OF AUBURN AND THE CITY OF ALGONA WHEREAS pursuant to RCW 35A11040 Auburn and Algona have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and Algona have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150 Auburn and Algona have the legal authority to maintain a sewerage system NOW THEREFORE THE COUNCIL OF THE CITY OF AUBURN WASHINGTON IN A REGULAR MEETING DULY ASSEMBLED HEREWITH RESOLVES THAT Section 1 The Mayor and City Clerk of the City of Auburn are herewith authorized to execute an Interlocal Agreement establishing sanitary sewer service boundaries between the City of Auburn and the City of Algona in the Resolution No 3589 March 19 2003 Page 1 form substantially as the agreement attached hereto marked as Exhibit 1 and incorporated herein by this reference Section 2 That the Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry outthe directions of this legislation Section 3 That this resolution shall be in full force and effect upon passage and signatures hereon DATED this day of C 2003 AUBURN PETER B LEWIS MAYOR ATTEST 1 r D ielle E Daskam City Clerk APPROVED FORM iel B id City Attorney Resolution No 3589 March 19 2003 Page 2 Return Address Auburn City Clerk City of Auburn 25West Main St Auburn WA 98001 RECORDERS COVER SHEET Document Titles or transactions contained therein 2r fi Interlocal Agreement RES 3589 Sanitary Sewer Boundaries i 1 Reference Numbersof Documents assigned or released Additional reference s on page of document GrantorsBorrowersLast name first then first name and initials Auburn City of GranteeAssigneeBeneficiary Last name first 1 Algona City of ti ra u K Legal Description abbreviated ielot block plat or section township range PER RCW 3934 Additional legal is on page of document 4ssessors Property Tax ParcelAccount Number NA Assessor Tax not yet assigned EXHIBIT 1 INTERLOCAL AGREEMENT between CITY OF ALGONA and CITY OF AUBURN for the THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered intothis day of tom 2003 by and between the CITY OF ALGONA a Washington mu icipal corporation hereinafter referred to as Algona and the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35A11040 Auburn and Algona have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and Algona have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150 Auburn and Algona have the legal authority to maintain a sewerage system and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost and WHEREAS portions of the Algona sanitary sewer system havebeen sized and are situated soas tobe capable of affording sewer service to a portion of the Auburn Sanitary Sewer Service Area and WHEREAS Auburn has evaluated and determined it is in Auburns best interest to allow Algona to provide sewer service to property within Auburns municipal boundary that lies adjacent to Algonassanitary sewer infrastructure and WHEREAS Algona has sufficient capacity within their sanitary sewer facilities to support these adjustments to the existing sewer service areas and EXhlblt 1 Algona Auburn Interlocal Agreement for the Resolution No 3589 Establishment of sanitary Sewer Service Boundaries Page 1 of 7 Page 1 of6 WHEREAS the parties desire to allow Algona to construct reconstruct repair and maintain sewer facilities and to authorize connections to Algonassewer system for service to the areas noted in Exhibit A and WHEREAS Algonasdelivery of sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed to adjust their sewer service area boundary between them The area to be adjusted is graphically depicted on the map attached hereto as Exhibit A which is by this reference incorporated herein Exhibit A represents an increase in Algonas sewer service area and a decrease in Auburns current sewer service area Both parties further agree that Algona in providing sewer service to the additional areas as shown on Exhibit A shall be furnishing sewer service to properties within Auburns water service area and Auburns municipal jurisdiction in accordance with and subject to theterms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Algona shall have the sole responsibility and authority to construct maintain manage conduct and operate its sewerage system as installed withinthe areas described in Exhibit A together with any additions extensions and betterments thereto Algona shall also be responsible for obtaining all necessary governmental franchises approvals easements and permits for the installation maintenance and operation of said sewerage systems as described above 3 Rates Charges Permits and Billing Responsibilities Through this Agreement Auburn is turning over the responsibility to own operate and maintain the sanitary sewer system including private side sewers within the public right of way to Algona Algona shall be the responsible agency to issue sewer certificates of availability for any development located withinthe area described by Exhibit A No connection or modification shall be made to Algonas sanitary sewer system and or private side sewer services connected to Algonas sewer system unless the property owner first pays the associated fees and submits the proper information to obtain an Algona sanitary sewer permit Sanitary sewer permits shall be subject to inspection and approval for compliance with Algonas Sanitary Sewer Standards as adopted at the time the connection is made The rates charged to Algonas sanitary sewer customers shall be fixed altered regulated and controlled by Algona pursuant to all applicable laws or regulations EXhlblt 1 Algona Auburn Interlocal Agreement for the Resolution No 3589 Establishment of Sanitary Sewer Service Boundaries Page 2 of 7 Page 2of6 promulgated on the subject of rates and charges for sewer service No surcharge shall be charged to the customers served under this agreement on the sole basis that those customers are outside of Algonascity limits To establish a quantitative usage Algona shall manually read Auburnswater meters servicing those properties described in Exhibit A Algona shall also have the ability to annually request water usage data from Auburn for said properties 4 Boundary Review Board In the event that implementation of theterms hereof results in permanent sewer service to areas that will be outside the respective service boundaries of Algona or Auburn the parties will at the time of such service jointly seek approval of the King County Boundary Review Board in accordance with RCW3693090 5 Comprehensive Sewer Planning The terms of this Agreement will be included as an element ofAuburn and AlgonasComprehensive Sewerage Plans 6 Reliance Each party hereto acknowledges that the other will rely upon the terms of this agreement in its comprehensive planning to meet the needs of the service area designated herein 7 Indemnification Algona agrees to indemnify and hold Auburn and its agents employees andor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst Auburn arising out of in connection with or incident to the execution of this agreement andor Algonas performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or result from the concurrent negligence of Auburn its agents employees andor officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of Algona and provided further that nothing herein shall require Algona to hold harmless or defend Auburn its agents employees andor officers from any claims arising from the sole negligence of Auburn its agents employees andor officers No liability shall attach to Auburn by reason of entering this agreement except as expressly provided herein Auburn agrees to indemnify and hold Algona and its agents employees andor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever king or nature broughtagainstAlgona arising out of in connection with or incident to the execution of this agreement andor Auburns performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or result from the concurrent negligence of Algona its agents employees andor officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of Auburn and provided further that nothing Exhibit 1 Algona Auburn Interlocal Agreement for the Resolution NO3589 Establishment of Sanitary Sewer Service Boundaries Page 3 Of 7 Page 3of6 herein shall require Auburn to hold harmless or defend Algona its agents employees andor officers from any claims arising from the sole negligence of Algona its agents employees andor officers No liability shall attach to Algona by reason of entering this agreement except as expressly provided herein 8 Assignment The parties shall not assign this agreement or any interest obligation or duty therein without the express written consent of the other party 9 Attorneys Fees If either party shall be required to bring any action to enforce any provision ofthis Agreement or shall be required to defend any action brought by the other party with respect to this Agreement and in the furtherevent that one party shall substantially prevail in such action the losing party shall in addition to all other payments required therein pay all of the prevailing partys reasonable costs in connection with such action including such sums as the court or courts may adjudge reasonable as attorneys fees in trial court and in appellate courts 10 Government Approvals The parties will give notice of the adoption of this Agreement to King Countys Department of Natural Resources Wastewater Treatment Division to the Department of Health and to any other agency with jurisdiction or mission relevant to theterms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof by those agencies 11 Service Amendments Any changes to the service areas described herein shall be by mutual agreement Each party may give permission to the other on a casebycase basis to provide service by one party into the other partys adjacent or nearby service area based upon considerations of economic efficiency for providing the service with mutual consent of Auburns Director of Public Works and Algonas Director of Public Works 12 Notices All notices between the two agencies hereunder may be delivered or mailed If mailed they shall be sent to the following respective addresses City of Algona Director of Public Works 402 Wards Street Algona WA 98001 2538332741 City of Auburn Director of Public Works 25 west Main Street Auburn WA 98001 2539313010 or to such other representative as either party may hereafter from time to time designate in writing All notices and payments mailed by regularpost including first class shall be deemed to have been given on the second business day following the date of mailing if properly mailed and addressed Notices and payments sent by Exhibit 1 Algona Auburn Interlocal Agreement for the Resolution No 3589 Establishment of Sanitary Sewer Service Boundaries P1ge 4 Of 7 Page 4 of 6 certified or registered mail shall be deemed to have been given on the day next following the date of mailing if properly mailed and addressed For all types of mail the postmark affixed by the United States Postal Service shall be conclusive evidence of the date of mailing 13 Alteration Amendment or Modification Algona and Auburn hereby reserve the right to alter amend or modify theterms and conditions of this Agreement upon written agreement of both parties tosuch alteration amendment or modification Such written consentsshall be filed with this agreement for future reference 14 Sanctity of Agreement This agreement constitutes the entire agreement of the parties regarding the subject matter hereof and there areno other representations or oral agreements other than those listed herein which vary the terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 15 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Algona or Auburn regarding provision of sewer service except as specifically set forth herein 16 Miscellaneous A The captions in this agreement are for convenience only and do not in any way limit or amplify the provisions of this agreement B This agreement is established in perpetuity Modifications can be established upon written agreement between both parties C The purpose of this agreement is to clarify Algonas and Auburns sanitary sewer responsibilities for providing service and maintainingpublic sewer facilities D If any term provision condition or portion of this Agreement is held to be invalid or unenforceable by a final decision of any court having jurisdiction on the matter the remaining of this Agreement or the application of such term or provision to persons or circumstances other then those as to which it is held invalid or unenforceable shall not be affected thereby and shall continue in full force and effect unlesssuch court determines that invalidity or unenforceability materially interferes with or defeats the purposes hereof at which time Auburn or Algona shall have the right to terminate the Agreement E No modifications or amendments of this agreement shall be valid or effective unless evidenced by an agreement in writing signed by both parties Exhibit 1 Algona Auburn Interlocal Agreement for the Resolution No 3589 Establishment of Sanitary Sewer Service Boundaries Page 5 of 7 Page 5 of 6 IN WITNESSWHEREOF the parties hereto have executed this agreement as of the day and year first above written CITY OF ALGONA Approved by Resolution No 1J of the City of Algona Washington at its regularmeeting held on the day of 2003 By GLENN WILSON Mayor City of Algona Approved as to form City Clerk City r i GEORGE K LLEY City Attorney City of Algona CITY OF AUBURN Approved by Resolution No 5 of the City of Auburn Washington at its regularmeeting held on the 1 day of 2003 By PETER B LEWIS Mayor City of Auburn Attest DANIELLE DASKAM City Clerk City of Auburn Exhibit 1 Resolution No 3589 Page 6 of 7 Approveda orm Jrf NIEL B HEID City Attorney City of Auburn Algona Auburn Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Page 6 of 6 i T w ii i 1 Exhibit 1 Resolution 5 o Page 7 of 7 3751fio0713 3751800715 3751800717 3751800719 3751600721 3751800723 3751600725 t P 2321049039 1811 WVN1tY MWS R Ii 9 1 1 1 1 j i i i t t 3751800727 f 3751600731 I E 15 ST 1 I ifi a v j EXHIBIT A Auburns Sewer Service Area to be Transferred to Algona SE fr t j Mr EDGE OF PAVEMENT SEWER PARCELROW LINE PAG E CPfY LIMITS 1 Of 1 I IN Wd30S 111 11111111111111111111111111 111111111 11111 1 1I11111111111111 200508220499 8 PGS 0822 2005 10 30am 0 00 PIERCE COUNTY WASHINGTON Return Address Auburn City Clerk City of Auburn 25 West Main SI Auburn WA 98001 RECORDER S COVER SHEET Document Title sor transactions contained therein Interlocal Agreement RES 3760 Reference Number s of Documents assigned or released DAdditional reference s on page of document Grantor s Borrower s Last name first then first name and initials AllhLlrn City of Grantee Assignee Beneficiary Last name first 1 Bonney Lake City of Legal Description abbreviated ie lot block plat or section township range PER RCW 3934 D Additional legal is on page of document Assessor s Property Tax Parcel Account Number N A oAssessor Tax not yet assigned ti3 RESOLUTION NO 376 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN ADDENDUM TOAN INTERLOCAL AGREEMENT BETWEEN THE CITY OF AUBURN AND THE CITY OF BONNEY LAKE FOR THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES WHEREAS in March of 1998 the City Council of the City of Auburn adopted Resolution No 2925 authorizing the Mayor and City Clerk to execute a settlement agreement that was subsequently signed by the City of Auburn and the City of Bonney Lake and WHEREAS among other items that settlement agreement set forth a water service area boundary between the City of Auburn and the City of Bonney Lake and WHEREAS subsequent to approval of the settlement agreement the Potential Annexation Areas PM for the City of Auburn and City of Bonney Lake were amended to coincide with the water service area boundary and WHEREAS since the time of the agreement it has been found that a parcel was divided by the water service area boundary set forth in said settlement agreement and by the subsequent PM boundary established based on the water service area boundary and said parcel lies partially within and partially outside of the Auburn PM and Resolution No 3760 January 18 2005 Page 1 of 2 WHEREAS part of the Lake Tapps Parkway East extension s right of way also lies partially within and partially outside of the Auburn water service area boundary established by the settlement agreement and partially within and partially outside the subsequent PM boundary established based on the water service area boundary and WHEREAS sound growth management and transportation planning principles are best served by including entire parcels and entire street right of ways entirely within a PM NOW THEREFORE THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON HEREBY RESOLVES as follows Section 1 The Mayor and City Clerk are hereby authorized to execute Addendum No 1 to the Settlement Agreement between the City of Auburn and the City of Bonney Lake in substantial conformity with the Addendum attached hereto marked as Exhibit A and incorporated herein by this reference Section 2 That the Mayor is authorized to implement suchother administrative procedures as may be necessary to carry outthe directives of this legislation Section 3 That this Resolution shall take effect and be in full force upon passage and signatures hereon Resolution No 3760 January 18 2005 Page 2 of2 Dated and Signed this day ofTe Ac l 2005 CITY OF AUBURN m c ATTEST fDt4dr Danlelle E Daskam City Clerk Resolution No 3760 January 18 2005 Page 3 of 2 PE ER B LEWIS MAYOR ADDENDUM NO 1 ADDENDUM TO SETTLEMENT AGREEMENT BETWEEN THE CITY OF BONNEY LAKE ANDTHE CITY OF AUBURN RELATING TO WATER SERVICE AREA BOUNDARY THIS ADDENDUM is made and entered into this It1day of bltU1l 2005 by and between the CITY OF BONNEY LAKE a municipal corporation of teState of Washington hereinafter referred to as Bonney Lake and the CITY OF AUBURN a municipal corporation ofthe State ofWashington hereinafter referred to as the Auburn as an addendum to the Settlement Agreement between the parties executed on the5th day of March 1998 WIT N E SSE T H WHEREAS in March 1998 the City Council of the City of Auburn passed ResolutionNo 2925 authorizing the Mayor and City Clerk to execute a settlement agreement that was subsequently signed by the City of Auburn and the City of Bonney Lake and WHEREAS among other items the settlement agreement set forth a water service area boundary between the City of Auburn and the City of Bonney Lake and WHEREAS Exhibit B to the settlement agreement implied that Auburn s Urban Growth Area UGA was established to conformwith the water service area boundary set forth in the settlement agreement and WHEREAS subsequent to approval of the settlement agreement the Potential Annexation Area PAA for the City of Auburn was amended to coincide with the water service area boundary and WHEREAS Exhibit B to the settlement agreement stated that the UGA and water service area boundary was established to follow property lines and WHEREAS since the time of the agreement it has been found that a parcel was divided by the water service area boundary set forth in said settlement agreement and by the subsequent PAA boundary established based on the water service area boundary and said parcel lies partially within and partially outside of the Auburn PAA and WHEREAS part of the Lake Tapps Parkway East extension s right of way also lies partially within and partially outside ofthe Auburn water service area boundary established by the settlement agreement and partially within and partially outside the subsequent PAA boundary established based on the water service area boundary and Exhibit A Resolution No 3760 Page 1 of 4 Addendum No 1 to the March 1998 Auburn Boney Lake Settlement Agreement Page 1 of 2 WHEREAS sound growth management and planning principles are best served by including entire parcels within a PAA NOW THEREFORE in consideration oftheir mutual covenants conditions and promises the PARTIES DO HEREBY AGREE as follows ITEM ONE ADDITION OF PROPERTY The Settlement Agreement is revised to include a portion of Pierce County parcel 052005 4046 a portion of the Lake Tapps Parkway as it extends from the west boundary of 182nd Ave East west to Auburn s existing Urban Growth Area and a portion of the natural gas pipe line parcel as noted in the attached Exhibit C Exhibit C attached hereto and incorporated by reference as if fully set forth hereinshall provide both a graphical representation and a legal description for the parcels that are to be included in Auburn s UGA for urban services and incorporated into the area that Bonney Lake shall be the water purveyor for within Auburn s UGA as defined in the original settlement agreement between Auburn and Bonney Lake ITEM TWO REMAINING TERMS UNCHANGED That all other provisions of the Settlement Agreement between the parties executed on the 5th day of March 1998 shall remain unchanged and in full force and effect INWITNESS WHEREOF the parties hereto have executed this Agreement as ofthe day and year first above written c c PETER B LEWIS Mayor Attest Attest 4d4J 6 IO Danielle E Daskam City Clerk Approved as to form IJ 1 e ionne City Attorney J s Addendum NO 1 to the March 1998 Auburn Boney Lake Settlement Agreement Page 2 of 2 lame Exhibit A Resolution No 3760 Page 2 of 4 EXHIBIT C ADDENDUM 1 AUBURN BONNEY LAKE SETTLEMENTAGREEMENT LEGAL DESCRIPTION OF AREA THAT PORTION OF SECTION 5 TOWNSHIP 20 NORTHRANGE 5 EAST W M IN PIERCE COUNTY WASHINGTONDESCRIBED AS FOLLOWS BEGINNING AT THE SOUTHEAST CORNER OF THE WEST HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SAID SECTION 5 THENCE WESTERLY ALONG THE SOUTH LINE OF THE NORTH HALF OF THE SOUTHEAST QUARTER OF SAID SECTION 5 A DISTANCE OF 1360 FEET MORE OR LESS TO THE NORTHWESTERLY LINE OF THE LANDS CONVEYED TO EL PASO NATURAL GAS COMPANY BY DEED RECORDED UNDER PIERCE COUNTY AUDITOR S NUMBER 2410280 THENCENORTHEASTERLY ALONG SAID NORTHWESTERLY LINE A DISTANCE OF 1880 FEET MORE OR LESS TO THE NORTHLINE OF THE SOUTHEAST QUARTER OF SAID SECTION 5 THENCE EASTERLY ALONG THE NORTH LINE OF SAID SOUTHEAST QUARTER A DISTANCE OF 700 FEET MORE OR LESS TO THE WEST LINE OF THE LANDS GRANTED TO PIERCE COUNTY FOR 182ND AVENUE EAST DESCRIBED IN DEED RECORDED UNDER PIERCE COUNTY AUDITOR S NUMBER 2257762 THENCESOUTHERLY ALONG THE WEST LINE OF 182ND AVENUE EAST AS DESCRIBED IN SAID INSTRUMENT A DISTANCE OF 40 FEET MORE OR LESS TO THE SOUTH LINE OF THE LANDS CONVEYED TO PIERCE COUNTY IN DEED RECORDED UNDER AUDITORS FILE NUMBER 9902110924 THENCE WESTERLY ALONG LAST SAID SOUTH LINE AND ALONG THE SOUTH LINE OF THE LANDS CONVEYED TO PIERCE COUNTY IN DEED RECORDED UNDER AUDITORS FILE NUMBER 200405180889 AND DEPICTED IN MAP ON FILE IN THE OFFICE OF THE DIRECTOR OF PIERCE COUNTY PUBLIC WORKS ANDUTILITIES IN TACOMA WASHINGTON ENTITLED LAKE TAPPS PARKWAY EAST RIGHT OF WAY PLAN CRP 5486 AND BEARING APPROVAL DATE OF NOVEMBER 17 2003 A DISTANCE OF 600 FEET MORE OR LESS TO THE EAST LINE OF THE WEST HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SAID SECTION 5 THENCESOUTHERLY ALONG THE EAST LINE OF SAID WEST HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SAID SECTION 5 A DISTANCE OF 1220 FEET MORE OR LESS TO THE POINT OF BEGINNING i1 S aH ilu V I Yo 8 0 jendui dd c i Ge c ti iLDOC Exhibit A Resolution No 3760 Page 3 of 4 EXHIBIT C Addendum No 1 to the March 199B Auburn Boney Lake Settlement Agreement Page 1 of 2 EXHIBIT C AKE TAPPS P v q 0O EXHIBIT A RESOLUTION NO3760 PAGE 4 OF 4 EXHIBIT C ADDENDUM NO 1 TO THE MARCH 98 AUBURN BONNEYLAKE SETTLEMENT AGREEMENT PAGE 2 OF 2 r 1 l N 1 11111111111111111111111111111111111111111111111 1111111111 11111 1111111120051110019314PGS111020051049am000PIERCECOUNTYWASHINGTON Return Address Auburn City Clerk City of Auburn 25 West Main St Auburn WA 98001 RECORDER S COVER SHEET Document Title s or transactions contained therein Interlocal Agreement Resolution No 3796 Reference Number s of Documents assigned or released DAdditional reference s on page of document Grantor s Borrower s Last name first then first name and initials Auburn City of Grantee Assignee Beneficiary Last name first 1 Bonney Lake City of Legal Description abbreviated ie lot block plat or section township range PER RCW 3934 D Additional legal is on page of document Assessor s Property Tax Parcel Account Number N A o Assessor Tax not yet assigned Seid documoats New f1j1flfor record by PacificNortnwest Title as aooommodation only It hanot been eMmlned as to proper exeaJtion or epon tide 11 y RESOLUTION NO 379 6ARESOLUTIONOFTHECITYCOUNCIL OF THE CITYOFAUBURNWASHINGTONAUTHORIZINGTHEMAYORTOEXECUTEANINTERLOCALAGREEMENTWITHTHECITYOFBONNEYLAKETOPROVIDESANITARYSEWERSERVICEFROMAUBURNTOPROPERTYLOCATEDWITHINBONNEYLAKESSANITARYSEWERSERVICEAREA WHEREAS pursuant to RCW 35A 11 040 Bonney Lake and Auburn have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 39 34 the Interlocal Cooperation Act Bonney Lake and Auburn have the legal authority to cooperate with other localities on the basisof mutual advantage and provision of services and WHEREAS pursuant to RCW 35A 21 150 Bonney Lake and Auburn have the legal authority to maintain a sewerage system and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customersat reasonable cost and WHEREAS portions of the Auburn sanitary sewer system are sized and are situated soas to be capable of affording sewer service to a portion of the Bonney Lake Sanitary Sewer Service Area and Resolution No 3796 March 14 2005 Page 1 WHEREAS Bonney Lake has evaluated and determined it is in BonneyLakesbestinteresttoestablishthisAgreementallowingAubumtoprovidesewerservicetopropertywithinBonneyLakessanitarysewerserviceareathatliesinthevicinityofAuburnssanitarysewerinfrastructureandWHEREASAuburnsdeliveryofsewerservicetotheseareaswill provide the maximum efficiency in the use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON HEREBY RESOLVES as follows Section 1 The Mayor is hereby authorized to execute an Interlocal Agreement with the City of Bonney Lake in substantial conformity with the agreement attached hereto marked as Exhibit 1 and incorporated herein by this reference Section 2 That the Mayor is authorized to implement such other administrative procedures as may be necessary to carry out the directivesof this legislation Section 3 That thisResolution shall take effect and be in full force upon passage and signatures hereon Resolution No 3796 March 14 2005 Page 2 Dated and Signed this lt day of hy 2005CITYOFAUBURNPETRBLWISMAYOR ATTEST JJa Danielle E Daskam City Clerk APPROVED TO FORM Resolution No 3796 March 14 2005 Page 3 EXHIBIT 1INTERLOCALAGREEMENTbetweenCITYOFAUBURNandCITYOFBONNEY LAKEfortheTHEESTABLISHMENTOFSANITARYSEWERSERVICEBOUNDARIESFairweatherCove THIS AGREEMENT made and entered into by and between the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn and the CITY OF BONNEY LAKE a Washington municipal corporation hereinafter referred to as Bonney Lake both being duly organized and existing under and by virtue of the laws of the State ofWashington WITNESSETH WHEREAS pursuant to RCW 35A 11 040 Bonney Lake and Auburn have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Bonney Lake and Auburn have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A 21 150 Bonney Lake and Auburn have the legal authority to maintain a sewerage system and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliableservice to their customersat reasonable cost and WHEREAS portions of the Auburn sanitary sewer system have been sized and are situated soas tobe capable of affording sewer service to a portion of the Bonney Lake Sanitary Sewer Service Area and WHEREAS Bonney Lake hasevaluated and determined it is in Bonney Lake s bestinterest to establish this Agreement allowing property located within Bonney Lake s sewer service area and designated within Pierce County s Urban Growth Area CUGA to connect into Auburn s public sanitary sewer facilities and WHEREAS Auburn recognizes the negative impacts septic tanks can have on water quality and the quality of life within and around Lake Tapps and Exhibit 1 Resolution No 3796 Page 1 of 9 Auburn Bonney Lake Interlocal Agreementfor the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove ITjJ J 1 It f WHEREAS Auburn has sufficient wastewater conveyance capacity withintheirsanitarysewerfacilitiestosupporttheseadjustmentstotheexistingsewerserviceareasandWHEREASAuburnsdeliveryofsewerservicetotheseareaswillprovidethemaximumefficiencyintheuseofexistingandfuturefacilitiestogetherwithorderlyandefficientsanitarysewerplanningNOWTHEREFOREITISHEREBYAGREEDbyandbetweenthepartiesheretoasfollows 1 Sewer ServiceArea The parties have agreed that Auburn will provide sanitary sewer service to Bonney Lake for a portion of Bonney Lake s sanitary sewer service area as graphically depicted on the map and legally described as Attachment A attached heretowhich is by this reference incorporated herein Attachment A represents Bonney Lake s sewer service area that Bonney Lake has negotiated with Auburn for wastewater conveyance and treatment via Auburn and King County facilities The actual sewer service provider to the area depicted within Attachment A shall remain Bonney Lake Both parties further agree that Auburn and Bonney Lake shall be subject to the terms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Auburn shall have the sole responsibility and authority toconstruct maintain manage conduct and operate its sewerage system as installed within Auburn s sanitary sewer service area Auburn shall be responsible for obtaining and maintaining a franchise from Pierce County for Auburn facilities located in Pierce County right of way Bonney Lake shall have the sole responsibility and authority for those facilities that extend outside of the public right of way within the region depicted within Attachment A Bonney Lake shall be responsible for obtaining and maintaining a franchise from Pierce County for Bonney Lake facilities located in Pierce County right of way Bonney Lake shall be responsible for the issuance of side sewer permits and the inspection of facilities located upon private property Certificates of sewer availability shall be issuedfrom Auburn to Bonney Lake Bonney Lake shall be responsible for ensuring the conditions of these certificates are met 3 Rates Charges Permits and Billing Responsibilities Auburn rates and connection charges system development charges shall be billed from Auburn to Bonney Lake in accordance with existing Auburn City Code at the time of service Bonney Lake shall provide Auburn with the appropriate information so that accurate billings can be established Auburn and King County shall have the authority to visit sites upon threat of termination of service to verify information provided by the property owner and or Bonney Lake is accurate King County s capacity charge shall be billed to the property seeking service directly from King CountyBonney Lake may electto pay the King County capacity charge directly to King County and collect Exhibit 1 Resolution No 3796 Page 2 of 9 Auburn Bonney Lake Interlocal Agreement forthe Establishment of Sanitary Sewer Service Boundaries Fairweather Cove the costs with the price of the Bonney Lake permit Auburn shall issue permits toBonneyLakepriortoBonneyLakesissuingofpermitstothepropertyownersNeitherAuburnnorthisagreementgovernsBonneyLakesratesandfeestobechargedtothepropertyownerfortheappropriateBonneyLakesidesewerpermitForCommercialestablishmentsnoadditionalconnectionsormodificationtoexistingfacilitiesshallbemadethatwouldalterthenumberofplumbingfixturesinthefacilitiesthatconveywastewatertoAuburnunlessthepropertyownerfirstpaystheassociatedfeesandsubmitstheproperinformationtoobtainaBonneyLakesanitarysewerpermitBonneyLakeshallinturnseekanAuburnsidesewerpermit Sanitary sewer permits shall be subject to inspection and approval by Bonney Lake Bonney Lake shall ensure that compliance with Auburn s Sanitary Sewer Standards as adopted at the time the connection is made With this agreement Bonney Lake is providing Auburn with the right to manually read Bonney Lake s water meters for the properties described in Attachment A however if requested by Auburn Bonney Lake shall provide water usage information The rates and fees charged to Auburn s sanitary sewer customers shall befixed altered regulated and controlled by Auburn pursuant to all applicable laws and regulations promulgated on the subject of rates and charges for sewer service No surcharge shall be charged to the customers served underthis agreement on the sole basis that those customers are outside of Auburn s city limits Auburn shall sendbills for sanitary sewer service from said property to Bonney Lake s Finance department once every two months 4 Boundary Review Board In the event that implementation of theterms hereof results in permanent sewer service to areas that will be outside the respective service boundaries of Auburn or Bonney Lake the parties will at the time of such service jointly seek approval of the Pierce County Boundary Review Board in accordance with RC W 3693 090 5 Comprehensive Sewer Planning The terms of this Agreement will be included as an element of Bonney Lake and Auburn s Comprehensive Sewerage Plans 6 Reliance Each party hereto acknowledges that the other will rely upon the terms of this agreement in its comprehensive planning to meet the needs of the service area designated herein 7 Indemnification Auburn agrees to indemnify and hold Bonney Lake and its agents employees and or officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst Bonney Lake arising out of in connection with or incident to the execution of this Exhibit 1 Resolution No 3796 Page 3 of 9 Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove agreement and or Auburn s performance or failure to perform any aspect of thisAgreementprovidedhoweverthatifsuchclaimsarecausedbyorresultfromtheconcurrentnegligenceofBonneyLakeitsagentsemployeesandorofficersthisindemnityprovisionshallbevalidandenforceableonlytotheextentofthenegligenceofAuburnandprovidedfurtherthatnothinghereinshallrequireAuburntoholdharmlessordefendBonneyLakeitsagentsemployeesandorofficersfromanyclaimsarisingfromthesolenegligenceofBonneyLakeitsagentsemployeesandorofficersNoliabilityshallattachtoBonneyLakebyreasonofenteringthisagreementexceptasexpresslyprovidedhereinBonneyLakeagreestoindemnifyandholdAuburnanditsagentsemployeesandor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst Auburn arising out of in connection with or incident to the execution of this agreement and or Bonney Lake s performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or resultfrom the concurrent negligence of Auburn its agents employees and or officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of Bonney Lake and providedfurtherthatnothinghereinshallrequireBonneyLaketoholdharmlessordefend Auburn its agents employees and or officers from any claims arising from the sole negligence of Auburn its agents employees and or officers No liability shall attach to Auburn by reason of entering this agreement except as expressly provided herein 8 Assignment The parties shall not assign this agreement or any interest obligation or duty therein without the express written consent of the other party 9 Attorney s Fees If either party shall be required to bring any action to enforce any provision of this Agreement or shall be required to defend any action brought by the other party with respect tothis Agreement and in the further event that one party shall substantially prevail in such action the losing party shall in addition to all other payments required therein pay all of the prevailing party s reasonable costs in connection with such action including such sums as the court or courts may adjudge reasonable as attorney s fees in trial court and in appellate courts 10 Government Approvals The parties will give notice of the adoption of this Agreement to King County s Department of Natural Resources Wastewater Treatment Division to the Pierce County Department of Health and to any other agency with jurisdiction or mission relevant to the terms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof bythoseagencies Exhibit 1 Resolution No 3796 Page 4 of 9 Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove 11 Service Amendments Any changes to the service areas described hereinshallbebymutualagreementEachpartymaygivepermissiontotheotheronacasebycasebasistoprovideservicebyonepartyintotheotherpartysadjacentornearbyserviceareabaseduponconsiderationsofeconomicefficiencyforprovidingtheservicewithmutualconsentofBonneyLakesDirectorofPublicWorksandAuburnsDirectorofPublicWorks12NoticesAllnoticesbetweenthetwoagencieshereundermaybedeliveredormailedIfmailedtheyshallbesenttothefollowingrespectiveaddresses City of Auburn Director of Public Works 25 West Main Street Auburn WA 98001 253 931 3010 City of Bonney Lake Director of Public Works PO Box 7380 19306 Bonney Lake Blvd Bonney Lake WA 98390 253862 8602 or to suchother representative as either party may hereafter from time to time designate in writing All notices and payments mailed by regular post including first class shall be deemed to have been given on the second business day following the date of mailing if properly mailed and addressed Notices and payments sent by certified or registered mail shall bedeemedto have been given on the day next following the date of mailing if properly mailed and addressed For all types of mail the postmark affixed by the United States Postal Service shall be conclusive evidence of the date of mailing 13 Alteration Amendment or Modification Auburn and Bonney Lake hereby reserve the right to alter amend or modify the terms and conditions of this Agreement upon written agreement of both parties to such alteration amendment or modification Such written consent s shall be filed with this agreement for future reference 14 Sanctity of Agreement This agreement constitutes theentire agreement of the parties regarding the subject matter hereof and there are no other representations or oral agreements other than those listed herein which vary the terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 15 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Auburn or Bonney Lake regarding provision of sewer service except as specifically set forth herein Exhibit 1 Resolution No 3796 Page 5 of 9 Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove CITY OF AUBURNApprovedbyResolution No 3796 of the City of Auburn Washington at itsregularmeetingheldonthetdayofv2005 PETER B LEWIS Mayor City of Auburn cBy c Attest Approved as to form fkL DAN LLE DASKAM City Clerk City of Auburn Exhibit 1 Resolution No 3796 Page 7 of 9 Auburn Bonney Lake Interlocal Agreement forthe Establishment of Sanitary Sewer Service Boundaries Fairweather Cove ATTACHMENT ALegalDescriptionTHATPORTIONOFTHENORTHWESTQUARTEROFTHE NORTHEAST QUARTERANDTHATPORTIONOFTHENORTHEASTQUARTEROFTHENORTHWESTQUARTEROFSECTION8TOWNSHIP20NORTHRANGE5EASTLYING EASTERLY OF SUMNER TAPPS HIGHWAY SOUTHERLY OF NORTH TAPPS ROAD 16TH STREET EAST FOREST CANYON ROAD EASTERLY OF THE PLAT OF LAKE TAPPS TACOMA POINT ADDITION ACCORDING TO PLAT RECORDED IN BOOK 17 OF PLATS AT PAGES 1 TO 8 INCLUSIVE AND NORTHERLY OF THE INTAKE CANAL TO LAKE TAPPS IN PIERCE COUNTY WASHINGTON EXCEPT THAT PORTION LYING WITHIN LAKE TAPPS AREA DESCRIBED IS APPROXIMATELY i167 ACRES PARCEL NUMBER 0520081001 ATTACHMENT A Page 1 of 2 Exhibit 1 Resolution No 3796 Page 8 of 9 Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove Ln No10JNZQcWmEcazQo0wI61Iwt 3 311 H1BLJ o III f2 I OJ o o GJ LD o Zw w Za W CO c U t o COW 0 W W S ii W Ws Z O ZUl O LJ COo Zi1i as Zo6 WVl Uo a W 5 a W Vl o z wVl eXw o o I lO CD0r tI 0 i Z r cO is 2 0 g 0 0 CIclCCIaswaD LOY r27dSI 0 0 9 RESOLUTION NO 3873 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTONAUTHORIZING THE MAYOR TO EXECUTE AN INTERLOCAL AGREEMENT WITH THE CITY OF BONNEY LAKE FOR THE ESTABLISHMENT OF A RIGHT OF WAY USE PERMIT WITH PIERCE COUNTY WHEREAS both Auburn and Bonney Lake are agencies qualified to engage in furnishing sanitary sewer service within their approved service areas and WHEREAS the residential development of Fairweather Cove is located within an unincorporated area of Pierce County designated to be serviced with sanitary sewer service from Bonney Lake at approximately 16th Street East and Sumner Tapps Highway WHEREAS Bonney Lake lacks a franchiseto operate maintain repair and construct sewer mains and service lines and appurtenances in over along and under County roads and rights of way within the area of Pierce County Washington in whichFairweather Cove is located and WHEREAS Bonney Lake is in the process of completing an update to its Comprehensive Sewer Plan and intends to thereafter apply for and receive a franchise with Pierce County to enable it to provide sewer service to that area of Pierce County in which Fairweather Cove is located and WHEREAS Auburn maintains a franchise agreement with Pierce County dated July 8 1996 and expiring on July 8 2021 covering the area of Pierce County in which Fairweather Cove is located and Resolution No 3873 7 6 2005 Page 1 of 4 WHEREAS while service through Auburn s sewer system is available sewer service toFairweatherCove is more feasible throughBonney Lake s sewer system and WHEREAS Bonney Lakereceived a request for sewer service to Fairweather Cove from Harbour Homes the owner thereof hereinafter referred to as Developer in August 2001 and WHEREAS Bonney Lake and Auburn are pursuing a separate agreement between them that wouldallow for Bonney Lake to convey wastewater from a portion of Bonney Lake s service area into Auburn s wastewater conveyance system for treatment and disposal in an effort to provide for the most efficient sewer service to future customersat a reasonable cost and WHEREAS both Bonney Lake and Auburn agree that Fairweather Cove is best served by Bonney Lake under an interlocal agreement with Auburn and WHEREAS Bonney Lake entered into a Developer Public Facility Extension Agreement Extension Agreement with the Developer underwhich the Developer is required toconstruct necessary public improvements to serve Fairweather Cove and WHEREAS Auburn is willing to accept interim ownership and to assume interim responsibility for operation and maintenance of the Developer s public sewer improvements subject to theterms limitations and conditions of this Agreement and WHEREAS Bonney Lake is willing to accept transfer of ownership and responsibility for operation and maintenance of the Developer s public Resolution No 3873 7 62005 Page 2of 4 sewer improvements upon obtaining a sanitary sewer franchise from Pierce County to serve the area in which Fairweather Cove is located NOW THEREFORE THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON HEREBY RESOLVES as follows Section 1 The Mayor is hereby authorized to execute an interlocal agreement with the City of Bonney Lake in substantial conformity with the agreement attached hereto marked as Exhibit 1 and incorporated herein by this reference Section 2 That the Mayor is authorized to implement such other administrative procedures as may be necessary to carry outthe directives of this legislation Section 3 That this resolution shall take effect and be in full force upon passage and signatures hereon DATED and signed this gjj1 day of July 2005 CITY OF AUBURN PETER B LEWIS MAYOR ATTEST t Danielle E Daskam City Clerk Resolution No 3873 7 6 2005 Page 3 of 4 Resolution No 3873 76 2005 Page 4 of 4 EXHIBIT 1 AUBURN BONNEY LAKE INTERLOCAL AGREEMENT For Pierce County Right of Way Permit Fairweather Cove This Agreement entered into by and between the City of Bonney Lake a municipal corporation of the State of Washington hereinafter Bonney Lake and the City of Auburn a municipal corporation of the State of Washington hereinafter Auburn WHEREAS both Auburn and Bonney Lake are agencies qualified to engage in furnishing sanitary sewer service within their approved service areas and WHEREAS the residential development of Fairweather Cove is located within an unincorporated area of Pierce County designated tobe serviced with sanitary sewer service from Bonney Lake at approximately 16th Street East and Sumner Tapps Hwy WHEREAS Bonney Lake lacks a franchise to operate maintain repair and construct sewer mains and service lines and appurtenances in over along and under County roads and rights of way withinthe area of Pierce County Washington in which Fairweather Cove is located and WHEREAS Bonney Lake is in the process of completing an update to its Comprehensive Sewer Plan and intends to thereafter apply for and receive a franchise with Pierce County to enable it to provide sewer service to that area of Pierce County in which Fairweather Cove is located and WHEREAS Auburnmaintains a franchise agreement with Pierce County dated July 8 1996 and expiring on July 8 2021 covering the area of Pierce County in which Fairweather Cove is located and WHEREAS while service through Auburn s sewer system is available sewer service to Fairweather Cove is more feasible through Bonney Lake s sewer system and WHEREAS Bonney Lake received a request for sewer service to Fairweather Cove from Harbour Homes the owner thereof hereinafter referred to as Developer in August 2001 and Exhibit 1 Resolution No 3873 Bonney LakeAuburn Interlocal Agreement Fairweather Cove Development Page 1 of 5 WHEREAS Bonney Lake and Auburn are pursuing a separate agreement between them that would allow for Bonney Lake to convey wastewater from a portion of Bonney Lake s service area into Auburn s wastewater conveyance system for treatment and disposal in an effort to provide for the most efficient sewer service to future customersat a reasonable cost and WHEREAS both Bonney Lake and Auburn agree that Fairweather Cove is best served by Bonney Lake under an interlocal agreement with Auburn and WHEREAS Bonney Lake entered into a Developer Public Facility Extension Agreement Extension Agreement with the Developer underwhich the Developer is required toconstruct necessary publicimprovements to serve Fairweather Cove and WHEREAS Auburn is willing to accept interim ownership and to assume interim responsibility for operation and maintenance of the Developer s public sewer improvements subject to the terms limitations and conditions of this Agreement and WHEREAS Bonney Lake shall accept transfer of ownership and responsibility for operation and maintenance of the Developer s public sewer improvements upon obtaining a sanitary sewer franchise from Pierce County to serve the area in which Fairweather Cove is located NOW THEREFORE BE IT AGREED AS FOLLOWS 1 Consistent with theterms of this Agreement and Auburn s sewer franchise agreement with Pierce County Auburn shall own operate and maintain for the period of time described herein public sewer improvements for Fairweather Cove constructed pursuant to theExtension Agreement between Bonney Lake and Developer to the point of connection of said improvements with Auburn s existing gravity sewer located along the Sumner Lake Tapps Hwy Auburn shall receive wastewater from Fairweather Cove through these improvements and shall provide sewer service from this pointthrough Auburn s conveyance system to King County s conveyance system for ultimate disposal at the King County sewer treatment plant located in Renton Washington 2 Bonney Lake shall administer all aspects of theExtension Agreement including the construction of the sewer improvements required to serve Fairweather Cove to Bonney Lake standards Auburn shall have the right to inspect and approve plans for and construction of the public sewer improvements required to serve Fairweather Cove as necessary to comply with Auburn s sewer franchise with Pierce County Upon request from Bonney Lake Auburn shall Exhibit 1 Auburn Resolution No 3873 Bonney LakeAuburn Interlocal Agreement Fairweather Cove RW Permit Page 2 of 5 apply for the R O W permit required from Pierce County for construction of the Developer s public sewer improvements in Pierce County right of way 3 Auburn and Bonney Lake shall work in good faith to review all project plans and to inspect all project construction in a timely manner and where and when appropriate to modify Bonney Lake s standards to facilitate compliance with the terms and conditions of Auburn s sewer franchise with Pierce County Bonney Lake agrees that it shall be responsible to comply with any requirements that may be generated if this Agreement is submitted to the Pierce County Boundary Review Board for approval 4 Upon Developer s completion of construction of sewer improvements and satisfaction of all terms and conditions of theExtension Agreement Bonney Lake shall transfer temporary ownership to Auburn for all public sewer improvements in Pierce County required to serve Fairweather Cove 5 Following satisfactory completion of the sewer improvementsproperty owners within Fairweather Cove may apply for connectionto the sewer system as single family residential customers of the Bonney Lake Sewer Utility Connection charges monthly rates and other charges shall be collected as defined by the Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries attached hereto and incorporated herein by this reference as Attachment B Auburn Resolution No 3796 6 In consideration of the receipt of the charges referenced in paragraph 5 above Bonney Lake agrees to provide the operation repair and maintenance both ordinary and extraordinary of the Auburn owned public sewer improvements for Fairweather Cove as referenced in paragraph 4 of this Agreement If any such operation and maintenance triggers any of the provisions of Auburn s sewer franchise with Pierce CountyBonney Lake shall promptlynotify Auburn Bonney Lake shall abide by any such provisions at the sole discretion of Auburn and at the sole cost of Bonney Lake 7 Upon Bonney Lake s written notice to Auburn that it has secured a sewer franchise with Pierce County for the area of Pierce County in which the Fairweather Cove development is located a copy of which franchise shall be provided with the written notice to Auburn Auburn shall by bill of sale immediately thereafter transfer ownership of the facilities temporarily owned by Auburn pursuant to this Agreement to Bonney Lake 8 Bonney Lake agrees to reimburse Auburn for all expenses incurred by Auburn including the cost of time spent by Auburn employees calculated at labor rates used to establish Auburn s fees and charges in connection with this Agreement and the provision of service to Bonney Lake s customers pursuant to the provisions herein Auburn agrees to submit to Bonney Lake no less than Exhibit 1 Auburn Resolution No 3873 Bonney Lake Auburn Interlocal Agreement Fairweather Cove RW Permit Page 3 of 5 annually a statement of charges due and Bonney Lake shall pay the same within 45 days of the billing date The parties agree towork cooperatively to resolve any dispute that may arise with respect to any such billing 9 This Agreement may be terminated or modified but only as agreed to in writing by both the parties 10 Bonney Lake and Auburn agree to indemnify defend and hold each other harmless from and against any loss cost damage or expense of any kind arising out of injury to person or damage to property in any manner caused by the parties own negligent conduct in the performance of this interlocal agreement 11 This Agreement constitutes the only agreement between the parties concerning sewer service to the Fairweather Cove Development and nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Bonney Lake or Auburn regarding the provision of sewer service within their respective service areas except as specifically set forth herein CITY OF AUBURN Approved by Resolution No 3 Jl73 of the City of Auburn Washington at its regular meeting held on the i Jt1 day of 2005 B h Peter Lewis Mayor City of Auburn Attest iS2I vIoADaelleDaskamCityClerk Exhibit 1 Auburn Resolution No 3873 Bonney Lake Auburn Interlocal Agreement Fairweather Cove RW Permit Page 4 of 5 CITY OF BONNEY LAKE Approved by Resolution No 47 of Washington at its regularmeeting held on the 2005 13y 7 I dT6t I Attest Approved as to form Ja Exhibit 1 Auburn Resolution No 3873 Bonney LakeAuburn Interlocal Agreement Fairweather Cove RW Permit the City of qI day of Bonney rr Lake Page 5 of 5 ATTACHMENT IeB INTERLOCAL AGREEMENT between CITY OF AUBURN and CITY OF BONNEY LAKE for the THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES Fairweather Cove THIS AGREEMENT made and entered into by and between the CITY OF AUBURN a Washingtonmunicipal corporation hereinafter referred to as Auburn and the CITY OF BONNEY LAKE a Washington municipal corporation hereinafter referred to as Bonney Lake both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35A 11 040 Bonney Lake and Auburn have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Bonney Lake and Auburnhave the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21 150 Bonney Lake and Auburn have the legal authority to maintain a sewerage system and WHEREAS the partiesrecognize the responsibility of public sanitary sewer utilities to provide efficient and reliableservice to their customersat reasonable cost and WHEREAS portions of the Auburn sanitary sewer system have been sized and are situated soas tobe capable of affording sewer service to a portion of the Bonney Lake Sanitary Sewer Service Area and WHEREAS Bonney Lake has evaluated and determined it is in Bonney Lake s bestinterest to establish this Agreement allowing property located within Bonney Lake s sewer service area and designated withinPierce County s Urban Growth Area CUGA to connect into Auburn s publicsanitary sewer facilities and WHEREASAuburn recognizes the negative impacts septic tanks can have on water quality and the quality of life within and around Lake Tapps and Auburn Bonney Lake Interlocal Agreement forthe Establishment of Sanitary Sewer ServiceBoundaries Fairweather Cove ATTACHMENT B WHEREAS Auburn has sufficient wastewater conveyance capacity within their sanitary sewer facilities to support these adjustments to the existing sewer service areas and WHEREAS Auburn s delivery of sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed that Auburn will provide sanitary sewer service to Bonney Lake for a portion of Bonney Lake s sanitary sewer service area as graphically depicted on the map and legally described as Attachment A attachedhereto which is by this reference incorporated herein Attachment A represents Bonney Lake s sewer service area that Bonney Lake has negotiated with Auburn for wastewater conveyance and treatment via Auburn and King County facilities The actual sewer service provider to the area depicted withinAttachment A shall remain Bonney Lake Both parties further agree that Auburn and Bonney Lake shall be subject to theterms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Auburn shall have the sole responsibility and authority toconstruct maintain manage conduct and operate its sewerage system as installed within Auburn s sanitary sewer service area Auburn shall be responsible for obtaining and maintaining a franchise from Pierce County for Auburn facilities located in Pierce County right of way Bonney Lake shall have the sole responsibility and authority for those facilities that extend outside of the public right of way within the region depicted within Attachment A Bonney Lake shall be responsible for obtaining and maintaining a franchise from Pierce County for Bonney Lakefacilities located in Pierce County right of way Bonney Lake shall be responsible for the issuance of side sewer permits and the inspection of facilities located upon private property Certificates of sewer availability shall be issued from Auburn to Bonney Lake Bonney Lake shall be responsible for ensuring the conditions of these certificates are met 3 Rates Charges Permits and Billing Responsibilities Auburn rates and connection charges system development charges shall be billed from Auburn to Bonney Lake in accordance with existing Auburn City Code at the time of service Bonney Lake shall provide Auburn with the appropriate information so that accurate billings can be established Auburn and King County shall have the authority to visit sites upon threat of termination of service to verify information provided by the Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer ServiceBoundaries Fairweather Cove ATTACHMENT B property owner and or Bonney Lake is accurate King County s capacity charge shall be billed to the property seeking service directly from King CountyBonney Lake may electto pay the King County capacity charge directly to King County and collect the costs with the price of the Bonney Lake permit Auburn shall issue permits to Bonney Lake prior to Bonney Lake s issuing of permits to the property owners NeitherAuburn nor this agreement governs Bonney Lake s rates and fees tobe charged to the property owner for the appropriate Bonney Lake side sewer permit For Commercial establishments no additional connections or modification to existing facilities shall be made that would alter the number of plumbing fixtures in the facilities that convey wastewater to Auburn unless the property owner first pays the associated fees and submits the proper information to obtain a Bonney Lake sanitary sewer permit Bonney Lake shall in turn seek an Auburnside sewer permit Sanitary sewer permits shall be subject to inspection and approval by Bonney Lake Bonney Lake shall ensure that compliance with Auburn s Sanitary Sewer Standards as adopted at the time the connection is made With this agreement Bonney Lake is providing Auburn with the right to manually read Bonney Lake s water meters for the properties described in Attachment A however if requested by Auburn Bonney Lake shall provide water usage information The rates and fees charged to Auburn s sanitary sewer customers shall be fixed altered regulated and controlled by Auburn pursuant to all applicable laws and regulations promulgated on the subject of rates and charges for sewer service No surcharge shall be charged to the customers served underthis agreement on the sole basis that those customers are outside of Auburn s city limits Auburn shall send bills for sanitary sewer service from said property to Bonney Lake s Finance department once every two months 4 Boundary Review Board In the event that implementation of theterms hereof results in permanent sewer service to areas that will be outside the respective serviceboundaries of Auburn or Bonney Lake the parties will at the time of such service jointly seek approval of thePierce County Boundary Review Board in accordance with RC W 3693 090 5 Comprehensive Sewer Planning The terms of this Agreement will be included asan element of Bonney Lake and Auburn s Comprehensive Sewerage Plans 6 Reliance Each party hereto acknowledges that the other will rely upon the terms of this agreement in its comprehensive planning to meet the needs of the service area designated herein Auburn Bonney Lake Interlocal Agreement forthe Establishment of Sanitary Sewer ServiceBoundaries Fairweather Cove ATTACHMENT B 7 Indemnification Auburn agrees to indemnify and hold Bonney Lake and its agents employees and or officers harmless from and shall process and defend at its own expense any and all claims demands suitsat law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst Bonney Lake arising out of in connection with or incident to the execution of this agreement and or Auburn s performance or failure to perform any aspect of this Agreement provided however that if suchclaims are caused by or result from the concurrent negligence of Bonney Lake its agents employees and or officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of Auburn and provided further that nothing herein shall require Auburn to hold harmless or defend Bonney Lake its agents employees and or officers from any claims arising from the sole negligence of Bonney Lake its agents employees and or officers No liability shall attach to Bonney Lake by reason of entering this agreement except as expressly provided herein Bonney Lake agrees to indemnify and hold Auburn and its agents employees and or officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst Auburn arising out of in connection with or incident to the execution of this agreement and or Bonney Lake s performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or resultfrom the concurrent negligence of Auburn its agents employees and or officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of Bonney Lake and provided further that nothing herein shall require Bonney Lake to hold harmless or defend Auburn its agents employees and or officers from any claims arising from the sole negligence of Auburn its agents employees and or officers No liability shall attach to Auburn by reason of entering this agreement except as expressly provided herein 8 Assignment The parties shall not assign this agreement or any interest obligation or duty therein without the express written consent of the other party 9 Attorney s Fees If either party shall be required to bring any action to enforce any provision of this Agreement or shall be required to defend any action brought by the other party with respect to this Agreement and in the furtherevent that one party shall substantially prevail in such action the losing party shall in addition to all other payments required therein pay all of the prevailing party s reasonable costs in connection with such action including such sums as the court or courts may adjudge reasonable as attorney s fees in trial court and in appellate courts f Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove ATTACHMENT B 1 O Government Approvals The parties will give notice of the adoption of this Agreement to King County s Department of Natural Resources Wastewater Treatment Division to thePierce County Department of Health and to any other agency with jurisdiction or mission relevantto the terms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof by those agencies 11 Service Amendments Any changes to the service areas described herein shall be by mutual agreement Each party may give permission to the other on a case by case basis to provide service by one party into the other party s adjacent or nearby service area based upon considerations of economic efficiency for providing the service with mutual consent of Bonney Lake s Director of Public Works and Auburn s Director of Public Works 12 Notices All notices between the two agencies hereunder may be delivered or mailed If mailed they shall be sent to the following respective addresses 253 931 3010 City of Bonney Lake Director of Public Works PO Box 7380 19306 Bonney Lake Blvd Bonney Lake WA 98390 253862 8602 City of Auburn Director of Public Works 25West Main Street Auburn WA 98001 or to such other representative as either party may hereafter from time to time designate in writing All notices and payments mailed by regular post including first class shall be deemedto have been given on the second business day following the date of mailing if properly mailed and addressed Notices and payments sent by certified or registered mail shall bedeemedto have been given on the day next following the date of mailing if properly mailed and addressed For all types of mail the postmark affixed by the United States Postal Service shall be conclusive evidence of the date of mailing 13 Alteration Amendment or Modification Auburn and Bonney Lake hereby reserve the right to alter amend or modify theterms and conditions of this Agreement upon written agreement of both parties tosuch alteration amendment or modification Such written consent s shall befiled with this agreement for future reference 14 Sanctity of Agreement This agreement constitutes theentire agreement of the parties regarding the subject matter hereof and there are no other representations or oral agreements other than those listed herein which vary the Auburn Bonney Lake Interlocal Agreement forthe Establishment of Sanitary Sewer Service Boundaries Fairweather Cove ATTACHMENT Bit terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 15 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Auburn or Bonney Lake regarding provision of sewer service except as specifically set forth herein 16 Miscellaneous A The captions in this agreement are for convenience only and do not in anyway limit or amplify the provisions of this agreement B This agreement is established in perpetuity Modifications can be established upon written agreement between both parties C The purpose of this agreement is to clarify Auburn s and Bonney Lake s sanitary sewer responsibilities for providing service and maintaining public sewer facilities D If any term provision condition or portion of this Agreement isheld to be invalid or unenforceable by a final decision of any court having jurisdiction on the matter the remaining of this Agreement or the application of such term or provision to persons or circumstances other then those as to which it isheld invalid or unenforceable shall not be affected thereby and shall continue in full force and effect unless such court determines that invalidity or unenforceabilUy materially interferes with or defeats the purposes hereof at which time Bonney Lake or Auburn shall have the right to terminate the Agreement E No modifications or amendments of this agreement shall be valid or effective unless evidenced by an agreement in writingsigned by both parties IN WITNESS WHEREOF the parties hereto have executed this agreement as of the day and year first above written Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove ATTACHMENT Bit CITY OF BONNEY LAKE Approved by Resolution No regular meeting held on the of the City of Bonney Lake Washington at its day of 2005 By ROBERT YOUNG Mayor City of Bonney Lake Attest Approved as to form HARWOOD T EDVALSON City Clerk City of Bonney Lake JAMES DIONNE City Attorney City of Bonney Lake CITY OF AUBURN Approved by Resolution No 3796 of the City of Auburn Washington at its regular meeting held on the day of 2005 By PETER B LEWIS Mayor City of Auburn Attest Approved as to form DANIEL B HElD City Attorney City of Auburn DANIELLE DASKAM City Clerk City of Auburn Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Fairweather Cove AITACHMENT B ATTACHMENT A Legal Description THAT PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER AND THAT PORTION OF THE NORTHEAST QUARTER OF THE NORTHWEST QUARTER OF SECTION 8 TOWNSHIP 20 NORTH RANGE 5 EAST LYING EASTERLY OF SUMNER TAPPS HIGHWAY SOUTHERLY OF NORTH TAPPS ROAD 16TH STREET EAST FOREST CANYON ROAD EASTERLY OF THE PLAT OF LAKE TAPPS TACOMA POINT ADDITION ACCORDING TO PLAT RECORDED IN BOOK 17 OF PLATS AT PAGES 1 TO 8 INCLUSIVE AND NORTHERLY OF THE INTAKECANAL TO LAKE TAPPS IN PIERCE COUNTY WASHINGTON EXCEPT THAT PORTION LYING WITHIN LAKE TAPPS AREA DESCRIBED IS APPROXIMATELY167ACRES PARCEL NUMBER 0520081001 ATTACHMENT A Page 1 of 2 Auburn Bonney Lake Interlocal Agreement for the Establishment of Sanitary Sewer ServiceBoundaries Fairweather Cove W Ln W Z z oN Q a I CD o o 0J LI oas Z 6wtI uo 0 w C a wtI In N o INffiCI c a Ifto o 0 K Ie wEwffiwcm0 c U 1 0 mwa W w 3Ulffiza5aZtIu IZt1i oo t w tu U RESOLUTION NO 1471 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE PIERCE COUNTY WASHINGTON AUTHORIZING AN INTERLOCAL AGREEMENTBETWEEN CITY OF AUBURN AND CITY OF BONNEY LAKE PIERCE COUNTY RIGHT OF WAY PERMITFOR SEWERSERVICE TO FAIRWEATHER COVE The City Council of the City of Bonney Lake Washington does hereby resolve that the Mayor is authorized to sign the contract attachedhereto and incorporated herein by this reference PASSED by the City Council this 9th day of August 2005 ATTEST 4 APPROVEDAS TO FORM RESOLUTION NO 3322 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BETWEEN THE CITY OF AUBURN AND THE CITY OF KENT WHEREAS pursuant to RCW 35A11040 Auburn and Kent have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and Kent have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150Auburn and Kent have the legal authority to maintain a sewerage system NOW THEREFORE THE COUNCIL OF THE CITY OF AUBURN WASHINGTON IN A REGULAR MEETING DULY ASSEMBLED HEREWITH RESOLVES THAT Section 1 The Mayor and City Clerk of the City of Auburn are herewith authorized to execute an Interlocal Agreement establishing sanitary sewer service boundaries between the City of Auburn and the City of Kent A copy of said Agreement is attached hereto denominated as Exhibit 1 and made a part hereof as though set forth in full herein Resolution No 3322 020601 Page 1 of2 Section 2 The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry outthe directives of this legislation e DATED thisJday q 2001 CITY OF AUBURN CHARLES A BOOTH MAYOR ATTEST e Danielle E Daskam City Clerk APPROVED AS TO FORM Il 4 Michael J Reynolds City Attorney Resolution No 3322 020601 Page 2of 2 Return Address Auburn City Clerk City of Auburn 25West Main St Auburn WA 98001 iiri RECORDERSCOVER SHEET C ca ca Document Titles or transactions contained therein7iIIJGtj 83 S 5 lZ INTERLOCAL AGREEMENT BETWEEN CITY OF AUBURN AND THE CITY OF KENT FOR THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUDNARIES Reference Numbers of Documents assigned or released Additional reference s on page of document GrantorsBorrowersLast name first then first name and initials CITY OF AUBURN CITY OF KENT GranteeAssigneeBeneficiary Last name first CITY OF AUBURN CITY OF KENT Legal Description abbreviated ielot block plat or section township range PER RCW 3934 Additional legal is on page of document Assessors Property Tax ParcelAccount Number PER RCW 3934 Assessor Tax not SSW dooumMavrrs f1idbr woid by PscicNorthwast Tith Ms acoommodafbn aNy k hss nd tin eowtdas b proper xarlirrt r ao to b U upon MME CITY OF KENT and CITY OF AUBURN INTERLOCAL AGREEMENT FOR THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered into this day of 2001 by and between the CITY OF KENT a Washington municipal corporation hereinafter referred to as Kent and the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35A11040 Auburn and Kent have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn p and Kent have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150 Auburn and Kent have the legal authority to maintain a sewerage system and r WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost d and WHEREAS Auburndesires new developments within its PotentialAnnexation Areato complete aPreannexation agreement with Auburn prior to receiving a certificate of sanitary sewer availability and WHEREAS portions of the Kent sanitary sewer system havebeen sized and are situated so as tobe capable of affording sewer service to a portion of Auburns Potential Annexation Area and WHEREAS Auburn has evaluated and determined it is not cost feasible to provide direct sewer service to AuburnsPotential Annexation Area property existing adjacent to Kents sanitary sewer infrastructure and Exhibit 1 Page 1 Of 5 Resolution No 3322 WHEREAS the parties desire to allow Kent to construct reconstruct repair and maintain sewer facilities as necessary and to authorizeconnectionsto Kents sewer system for service to noted areas or portions thereof and WHEREAS Kents sewer service to these areas will provide for maximum efficient use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed to a sewer service area boundary between them The boundary is graphicallydepicted on the map attached hereto as Exhibit A which is by this reference incorporated herein Both parties further agree that Kent in providing sewer service to the area shown on Exhibit A as Area ToBe Served By Kent shall be furnishing sewer service to properties within AuburnsPotential Annexation Area Kentshall provide service in accordance with and subject to theterms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Kentshall have the sole responsibility and authority to construct maintain manage conduct and operate its sewerage system as installed within the area described in Exhibit A together with any additions extensions and betterments thereto Kent shall also be responsible for obtaining all necessary governmental franchises approvals c easements and permits for the installation of said sewerage system as described above r 3 Service Rates and Connection Charges a Permit Required No connection shall be made to Kents sanitary sewer system unless the property owner first pays the associated fees and submits the proper information to obtain a Kent sanitary sewer connection permit The connection shall be subject to inspection and approval for compliance with Kents Sanitary Sewer Standards as adopted at the time the connection is made b Rates The rates charged to the sanitary sewer customer by Kent within the area described in Exhibit A shall be fixed altered regulated and controlled by Kent pursuant to all applicable laws or regulations promulgated on the subject of rates and charges for sewer service No surcharge shall be charged to the customers served under this agreement on the sole basis that those customers are within Auburns Potential Annexation Area Exhibit 1 Page 2 Of 5 Resolution No 3322 4 Planning Areas Kent hereby acknowledges the region to be within Auburns Potential Annexation Area Both parties acknowledge that Auburn desires aPre annexation Agreement from property seeking a sewer certificate of availability within Auburns Potential Annexation Area 5 Sewer Availability Certificates Commencing on March 1 2001 Kentshall issue sewer availability certificates for property within the area described in Exhibit A Kent agrees not to issue the availability certificate or any side sewer permit in the case of an existing development until Kent receives a copy of the City of Auburn PreAnnexationAgreement in a form accepted and approved by the City of Auburn 6 Future Annexations Each of the parties agree that Kent shall provide sanitary sewer service to the areas shown in Exhibit A without regard to the present corporate limits of the parties and without regard tofuture corporate limits as they may be amended by annexation to either party 7 Kent Comprehensive Sewer Planning The terms of this Agreement will be included asan element of KentsComprehensive Sewerage Plan Kent will submit to Auburn all Comprehensive Sewerage Plans and amendments thereto involving area andor system improvements within Auburnsplanning area 8 Auburn Comprehensive Planning The terms of this Agreement will be included as an element of the sewerage portion of AuburnsComprehensive Plan 9 Reliance Each party hereto acknowledges that the terms hereof will be relied upon by the other in its comprehensive planning to meet the needs of the service area designated herein c 10 Liability Neither party to this agreement shall be liable to the other party for any failure or interruption of service in the service area of the other party 11 Government Approvals The parties will give notice of the adoption of this Agreement to MetropolitanKing County to the Department of Ecology to the Department of Health and to any other agency with jurisdiction or mission relevant to theterms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof by those agencies 12 Boundary Review Board In the event that implementation of theterms hereof results in permanent sewer service to areas that will be outside the respective service boundaries of Kent or Auburn the parties will at the time of such service jointly seek approval of the King County Boundary Review Board in accordance with RCW 3693090 13 Service Amendments Any changes to the service areas described herein shall be by mutual agreement Each party may give permission to the other on a Exhibit 1 Page 3 Of 5 Resolution No 3322 casebycase basis to provide service by one party into the other partys adjacent or nearby service area based upon considerations of economic efficiency for providing the service with mutual consent of the Director of Public Works from both jurisdictions 14 Alteration Amendment or Modification Kent and Auburn hereby reserve the right to alter amend or modify the terms and conditions of this Agreement upon written agreement of both parties to such alteration amendment or modification 15 Sanctity of Agreement This agreement constitutes theentire agreement of the parties regarding the subject matter hereof and there areno other representations or oral agreements other than those listed herein which vary the terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 16 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Kent or Auburn regarding provision of sewer service except as specifically set forth herein CITY OF KENT Approved by Mt1 of the City of Kent Washington at its regularmeeting held on the STN day of Z 2001 gy Attest ayoitN Mayor City Clerk Cit f Kent Approved as to form Kent City Attorney t Exhibit 1 Page 4 Of 5 Resolution No 3322 CITY OF AUBURN Approved by Resolution No 3322 of the City of Auburn Washington at its regular meeting held on the U day of 2I 2001 r r J 1i By dc Charles A Booth Mayor Approved as to form Auburn City Attorney Exhibit 1 Resolution No 3322 Attest G Danielle Daskam City Clerk Page 5 of 5 s a wx qw 9 rmcewF e FW q W U aWFW6UgUFdqz s Q EPOr U7W WF0U zo UOG o aZ W LKz FVz OFZ C r ZF C O W CZZF W aa C3 z xa w ww a W zo 3w wxr SEzxamccnwiwWxwowuzrnz W aOQm3H aF U W N 0 ra a O v W 0 WQcn I 3 3 V QN2EI zWY a 9 N W Z NY 3S 3d Hlb2i Q O W H10 V w cn i r Q C t L3 cr C3 i 1D RESOLUTION NO 3 6 5 1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BETWEEN THE LAKEHAVEN UTILITY DISTRICT AND THE CITY OF AUBURN WHEREAS pursuant to RCW 35 A 11 040 Auburn has the legal authority to exercise its powers and perform any of its functions as set forth in RCW 39 34 and WHEREAS pursuant to RCW 39 34 the Interlocal Cooperation Act Auburn has the legal authority to cooperate with other localities and utilities on the basis of mutual advantage and the efficient provision of municipal services and WHEREAS pursuant to RCW 35A 21 150 Auburn has the legal authority to maintain asewerage system and WHEREAS pursuant to RCW 5708 044 Lakehaven has the legal authority whether by contract or otherwise to provide sewer service to property owners inareas outside existing district boundaries and WHEREAS the parties recognize the responsibility of public sanitary sewer utilities to provideefficientandreliableservicetotheircustomersatreasonablecostandResolutionNo3651December222003Page1 WHEREAS Lakehaven s 1999 Draft Comprehensive Wastewater System Plan notes a region within Auburn s Potential Annexation Area hereinafter referred to as Auburn s PAA to which Lakehaven intends to provide sanitary sewer service and WHEREAS Lakehaven is currently providing sanitary sewer service within Auburn s PAA and WHEREAS portions of the Lakehaven sanitary sewer system have been sized and are situated so as to be capable of affording sewer service to a portion ofAuburn s PAA and WHEREAS Auburn has evaluated sewer service issues and determined that it is not cost feasible to provide direct sewer service within its PAA adjacent toLakehaven ssanitary sewer infrastructure and WHEREAS Lakehaven s delivery of sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities and sanitary sewer planning NOW THEREFORE THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON HEREBY RESOLVES as follows Section 1 The Mayor ishereby authorized to execute an Interlocal Agreement Establishing Sanitary Sewer Service Boundaries between the Lakehaven Utility District and the City of Auburn in substantial conformity with Resolution No 3651December222003Page2 the agreement attached hereto marked as Exhibit A and incorporated herein by this reference Section 2 The Mayor is hereby authorized to implement such administrative procedures as may benecessary to carry out the directives of this legislation Section 3This resolution shall be in full force and effect upon passage and signatures hereon 9 DATED thlsd day OfJ1W kr 2004 PETER B LEWISMAYOR ATTEST tJ N c Darnelle E Daskam City Clerk Resolution No3651December222003Page3 IIII II 11111111 20041129000249 PACIFIC NUTITAG 31 00 PAGE001 OF 013 11 29 2004 10 09 KING COUNTY UA Return Address Auburn CityClerk City of Auburn 25 West Main Sl Auburn WA 98001 RECORDER S COVER SHEET DocumentTitle s ortransactionscontainedthereinInterlocalAgreementRES3651S Ip i r10 11 lL Reference Number s of Documents assigned or released DAdditional reference s on page of document Grantor s Borrower s Last name first then first name and initials Auburn City of Grantee Assignee Beneficiary Last name first 1 Lakehaven Utility District Legal Description abbreviated ie lotblock plat or sectiontownship range PER RCW 39 34o Additional legal is onpageofdocumentAssessorsPropertyTaxParcelAccountNumberNAoAssessorTaxnotyetassigned EXHIBIT A LAKEHAVEN UTILITY DISTRICT and CITY OF AUBURN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered intothis ZJ day of re l V V d 2004 by and between LAKEHAVEN UTILITY DISTRICT a Washington munic I corporation hereinafter referred to as Lakehaven and the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35 A 11 040 Auburn has the legal authority to exercise its powers and perform any of its functions as set forth in RCW 39 34 and WHEREAS pursuant to RCW 39 34 the Interlocal Cooperation Act Auburn has the legal authority to cooperate with other localities and utilities on the basis of mutual advantage and the efficient provision of municipal services and WHEREAS pursuant to RCW 35A 21150 Auburn has the legal authority to maintain a sewerage system and WHEREAS pursuant to RCW 57 08 005 5 and 57 08 044 Lakehaven as aspecial purpose water sewer district has the legal authority whether by contract or otherwise to provide sewer service to property owners in areas outside existing district boundaries and WHEREAS the parties recognize the responsibility of public sanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost and WHEREAS Lakehaven s adopted and approved 1999 Comprehensive Wastewater System Plan and its Amendment No 1notes a region within Auburn s Potential Annexation Area hereinafter referred to as Auburn s PAA towhich Lakehaven intends to provide sanitary sewer service and WHEREAS Lakehaven is currently providing sanitary sewer service within Auburn sPAAandExhibitAAuburnResolutionNo3651LakehavenAuburnInterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage1of5 r WHEREAS portions of the Lakehaven sanitary sewer system havebeen sized and are situated soas tobe capable of affording sewer service to a portion of Auburn s PAA and WHEREAS Auburn hasevaluated sewer service issues and determined that it is not cost feasible to provide direct sewer service within its PAA adjacent to Lakehaven s sanitary sewer infrastructure and WHEREAS Lakehaven s delivery of sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities and sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed to a mutual sewer service planning boundary as depicted on the maps attached hereto as Attachment 1 and legally described in Attachment 2 which are by this reference incorporated herein Both parties further agree that through this designation of the service boundary Lakehaven shall provide sanitary sewer service to properties mutually within its sanitary sewer service area and Auburn s PAA also depicted onAttachment 1 in accordance with and subject totheterms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Lakehaven shall have the sole responsibility and authority to construct maintain manage conduct and operate its sewerage system within the area mutually designated as Lakehaven s sanitary sewer service area and Auburn s PAA as depicted in Attachment 1 together with any additions extensions and betterments thereto Lakehaven shall also be responsible for obtaining all necessary governmental franchises approvals easements and permits for the installation of the sewerage system and improvements to belocated therein 3 Service Rates and Connection Charges a Permit Required No connection shall be made to Lakehaven s sanitary sewer system unless the property owner first pays the associated fees and submits the proper information to obtain a Lakehaven sanitary sewer connection permit and otherwise meets the requirements for service as provided in duly adopted Resolutions of Lakehaven The connection shall besubject to inspection for compliance with Lakehaven s standards as adopted at the time the connection is made Exhibit A Auburn Resolution No3651 Lakehaven Auburn Interlacal AgreementEstablishingSanitarySewerServiceBoundariesPage2of5 b Rates The rates charged to the sanitary sewer customer by Lakehaven mutually within Lakehaven s sanitary sewer service area and Auburn s PAA as depicted on Attachment 1 shall be fixed altered regulated and otherwise controlled by Lakehaven pursuant to the limitation on such authority as set forth in Chapter 57 RCW or other applicable laws 4 Sewer Availability Certificates Lakehaven shall continue to issue sewer availability certificates for property located both within its sanitary sewer service area and Auburn sPAA as depicted in Attachment 1 5 Future Annexations Each ofthe parties agree that Lakehaven shall provide sanitary sewer service to the area depicted in Attachment 1 without regard to the present corporate boundaries of the parties and without regard to future corporate boundaries as they may be periodically altered throughannexation 6 Lakehaven Comprehensive Sewer Planning The terms of this Agreement will be included as an amendment toLakehaven s Comprehensive Wastewater System Plan Lakehaven will submit to Auburn all Comprehensive Wastewater System Plans and amendments thereto involving areas and or system improvements within Auburn s PAA 7 Auburn Comprehensive Sewer Planning The terms ofthis Agreement will be included as an amendment to Auburn s Comprehensive Sewerage Plan Auburn will submit to Lakehaven all Comprehensive Sewerage System Plans and amendments thereto involving area and or system improvements within Auburn s PAA 8 Reliance Each party hereto acknowledges that the terms hereof will be relied upon by the other in its comprehensive planning to meet the needs of the service area designated herein 9 Liability The parties agree that this Agreement shall not be a source of liability for either party for any failure or interruption of service in the service area of the other party as designated herein 10 Government Approvals Auburn will give notice of the adoption of this Agreement to Metropolitan King County to the Department of Ecology to the Department of Health and to any other agency with jurisdiction over or other interest in the terms hereof and the parties shall cooperate and assist each other in all reasonable manner in procuring any necessary approvals hereof by those agencies 11 Boundary Review Board In the event that implementation of the terms hereof results in permanent sewer service to areas that will be outside the respective service boundaries of Lakehaven or Auburn the parties will at the time of such service jointly seek King County Boundary Review Board approval of such service in accordance with RCW 36 93 090 Exhibit AAuburnResolutionNo3651LakehavenAuburnInterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage3of5 12 Service Amendments Any changes to the service areas described herein shall be by mutual written agreement Each party through Auburn s Director of Public Works and Lakehaven s General Manager respectively may give written permission to the other on a case by case basis to provide service to the other party sadjacent or nearby sewer service area based upon considerations ofeconomic efficiency Such written permission s shall be filed with this agreement for future reference 13Alteration Amendment or Modification Any alterations amendments or modifications to this agreement shall be by mutual consent of the parties 14 Indemnification and Hold Harmless Each Party hereto agrees to protect defend and indemnify the other Party its officers officials employees and agents from any and all cost claims judgements and or awards of damages arising out ofor in any way resulting from the Party s default failure of performance or negligent conduct associated with this agreement by the Party its employees subcontractors or agents Each Party agrees that its obligations under this provision extend to any claim demand and or cause of action brought by or on behalf of any of its employees or agents The foregoing indemnity isspecifically and expressly intended to constitute a waiver of each Party simmunity under Washington s Industrial Insurance Act RCW Title 51 as respects the other Party only and only to the extent necessary to provide each Party with a full and complete indemnity of claims made by the other Party s employees The Parties acknowledge that these provisions were specifically negotiated and agreed upon by them 15 Miscellaneous Auburn and Lakehaven agree that an area in the vicinity of 51st Avenue South and South 320th Street and depicted in Attachment 3 is currently being served by Auburn via temporary pump station and may in the future be more efficiently served by agravity conveyance system discharging to Lakehaven s facilities This section does not obligate Lakehaven to accept any sanitary sewer facilities in said area This section is intended only to make Lakehaven aware of Auburn sdesire to eventually adjust the sanitary sewer service boundaries to allow Lakehaven to provide sanitary sewer service to said area and for Lakehaven to plan for this action Auburn and Lakehaven will abide by Section 12 ofthis Agreement when adjusting sanitary sewer service boundaries 16 Integration This agreement constitutes the entire agreement of the parties regarding the subject matter hereof and there are no other representations or oral agreements other than those listed herein which vary the terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 17 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either lakehaven orAuburn regarding provision of sewer service except as specifically set forth herein Exhibit AAuburn Resolution No 3651 Lakehaven Auburn Inter10calAgreementEstablishingSanitarySewerServiceBoundariesPage4of5 LAKEHAVEN UTILITY DISTRICT Approved by Resolution No 2co I oob of the Lakehaven Utility District Federal Way Washington at its regular meeting held on the efl day of JO v j 2004 1It Donald T Perry G Lakehaven Utility D eral Manager trict Ap roved as to for Jt7JIIf yc lCSteven H Pritchett General Counsel Lakehaven Utility District CITY OF AUBURN Approved by Resolution No 3651 of the City of Auburn Washington at its regular meeti held on the JJ day of4UL 2004 Attest Wf1J0 DanielleDaskamCityClerkPeter B Lewis Mayor City of Auburn Exhibit A Auburn Resolution No3651 Lakehaven Auburn Interlocal Agreement Establishing Sanitary Sewer ServiceBoundariesPage5of5 LEGEND I ATTAOlr 1LAlCEHAVENAl8lRN INTERLOCAI AGREEMENT ESr SNGTMY SEWER SERVICE BOUNDIRII5WiALJaJRNaTYLIMITS AUIlURN PM PRllPOSB SEIlVICI IIClUNDMY III fw LEGEND anlJMIIS SEWIRSBWICI BCl KWlI t A1Tl LAlCEHAVEN INTBlLOC ALBfI esrAIIJSHING 5NlnARYSEWERSERVICE 1IIIIrIMIIIll 1IoMIl I J Attachment 2 LAKEHAVEN UTILITY DISTRICT and CITY OF AUBURN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BOUNDARY DESCRIPTION BEGINNING at a point 170 feet east ofthe Northwest corner ofthe Southeast quarter ofthe Southwest quarter of Section 35 Township 22 North Range 4 East W Min King County Washington THENCE south 662 54 feet more or less to the North line ofthe South half of said subdivision THENCE easterly along said North line to a point 300 feet west of the East line of said subdivision THENCE south to a point 170 feet north of the South line of said subdivision THENCE east 300 feet more orless to the East line of said subdivision THENCE southerly along said East line to the South line of said Section 35 THENCE continuing southerly along the West line of the Northeast quarter of Section 2Township 21 North Range 4 East W M in King County Washington a distance of 221 12 feet THENCE easterly parallel with the North line of said subdivision 220 20 feet THENCE southerly parallel with the West line of said subdivision 130 feet THENCE easterly parallel with the North line of said subdivision 1 304 44 feet THENCE southerly parallel with the West line of said subdivision 494 feet THENCE easterly parallel with the North line of said subdivision 680 8 feet THENCE southerly parallel with the West line of said subdivision 100 feet THENCE easterly parallel with the North line of said subdivision 428 feet more or less tothe East line ofsaid subdivision THENCE southerly along said East line to the Northeast corner of the South half of the South half ofthe Northeast quarter of the SoutheastquarterofsaidSection2THENCEwesterlyalongtheNorthlineofsaidsubdivision51877feetAttachment2LakehavenAuburnInterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage1of4 j THENCE southerly parallel with the East line of said subdivision 328 01feet THENCE westerly along the South line of said subdivision 130 02 feet more or less to the Northeast corner of the West half of the Southeast quarter of the Southeast quarter of said Section 2 THENCE southerly along the East line of said subdivision 964 41 feet THENCE westerly parallel with the North line of said subdivision 650 feet more or less to the East line of the Southwest quarter of the Southeast quarter of said Section 2 THENCE southerly along said East line 328 77 feet more or less to the South line ofsaid subdivision THENCE westerly along said South line tothe centerline of 56th Avenue South THENCE southerly along said centerline of 56th Avenue South to the centerline of South 305th Street in Section 11 Township 21 North Range 4 East W M in King County Washington THENCE westerly along said centerline of South 305th Street to a point of intersection with the northerly projection of the West line of Lot 2 Block 5 Auburn Heights Park Division No 2 according to the plat thereof recorded in Volume 49 Page 99 records of King County Washington THENCE southerly 320 feet more or less parallel with said West line of Lot 2to the South line of Lot 4 Block 5 of said plat THENCE easterly along said South line of Lot 4 to the Northwest corner of Lot 5Block 5 of said plat THENCE southerly and southeasterly along the West lines of Lots 5and 9 of said plat to the Northeast corner of Block 7 Auburn Heights Park Division No 1 according to the plat thereof recorded in Volume 49 of Plats Page 56 records of King County Washington THENCE southerly along the East line of Block 7 of said plat to the Southeast corner of Lot 2 Block 7 of said plat THENCE westerly parallel with the South line of said plat along the north lines of Lot 19 and Lot 1 Block 6 Lot15and Lot 1 Block 5 andLot26Block4ofsaidplattothecenterlineof51stAvenueSouthTHENCEsoutherlyalongsaidcenterlineof51stAvenueSouthtotheSouthwestcornerofsaidSection11Attachment2LakehavenAuburnlnterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage2of4 THENCEcontinue southerly along the West line of Section 14 Township 21 North Range 4 East W M in King County Washington 329 57 feet THENCE east 30 feet to the Southwest corner of Lot 15 Peasley Ridge according to the plat thereof recorded in Volume 201 Pages 66 71 records of King County Washington THENCE continue easterly along the South line of said plat to the Southeast corner of Tract D Peasley Ridge THENCE northerly along the East line ofsaid Tract D 150 feet more or less to the Northwest corner of Lot 2King County Short Plat NO 1 080026R as recorded under Recording No 8106080708 records of King County Washington THENCE easterly along the North line of said Lot 2 to the West line of Lot 1King County Short Plat No 1080027 as recorded under Recording No 8106080709 records ofKing County Washington THENCE northerly along the West line of said Lot 1 to the Northwest corner thereof THENCE easterly along the North lines of Lots 1 2 and 4 of said short plat to the Northeast corner of said Lot 4 THENCE East 60 feet to the West line of Lot 19 West Auburn Five Acre Tracts according to the plat thereof recorded in Volume 15 Page 12 records of King County Washington THENCE southerly along the West line of said Lot 19 9 43 feet THENCE easterly parallel with the North line of said Lot 19 294 8 feet THENCE northerly parallel with the West line of said Lot 19 119 43 feet more or less to the South margin of South 320th Street THENCE easterly along said south margin of South 320th Street 150 feet THENCE southerly parallel with the West line of said Lot 19 119 43 feet THENCE easterly parallel with the North line of said Lot 19 959 feet THENCE southerly parallel with the West line of said Lot 195 feet THENCE easterly parallel with theNorth line ofsaid Lot 1913 53 feet THENCEsoutherlyparallelwiththeWestlineofsaidLot19178866feetmoreorlesstothemostNorthwesterlycornerofLot4KingCountyShortPlatNo278048asrecordedunderRecordingNo8004030782recordsofKingCountyWashingtonAttachment2LakehavenAuburnInterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage3of4 THENCE southerly along the West line of said Lot 4 to the Southwest corner thereof and the North line of Lot 2 King County Short Plat No 1077053 as recorded under Recording No 7808100856 THENCE westerly along the North line of said Lot 2 to the Northwest corner thereof THENCE southerly along the West lines of Lot 2 and Lot 4 of said short plat to the North line of Lot 30 West Auburn Five Acre Tracts according tothe plat thereof recorded in Volume 15 Page 12records of King County Washington THENCE easterly along the North line of said Lot 30 147 35 feet THENCE southerly parallel with the East line of said Lot 30 to the centerline of South 324th Street THENCE westerly along said centerline of South 324th Street to the centerline of 56th Avenue South THENCE southerly along said centerline of 56th Avenue South to the North margin of State Highway No 18 THENCE easterly along said North margin of State Highway No 18to the southerly projection of the centerline of 58th Avenue South THENCE southerly along said centerline of 58th Avenue South to the centerline of South 344th Street THENCE westerly along saidcenterline of South 344th Street to the centerline of 56th Avenue South THENCE southerly along said centerline of 56th Avenue South to the easterly projection of the South line of Lot 24 Block 27 Jovita Heights according to the plat thereof recorded in Volume 20of Plats Page 12 records of King County WashingtonandtheterminusofthisboundarydescriptionAttachment2LakehavenAuburnInterlocalAgreementEstablishingSanitarySewerServiceBoundariesPage4of4 LEGEND AUBURNSERVICE AREA lltAT MAY IE SERVED BY LAKEHAVEN PAA AUBURN arv LIMITS Abdhmemt 3 I Lakehlven Aubum InterIoaII Agleement EsllIbllshlng SanItary Sewer SeNIce IIotnIarIes Dee 2003PAGE11 RESOLUTION NO 38 2 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR TO EXECUTE AN INTERLOCAL AGREEMENT WITH THE LAKE HAVEN UTILITY DISTRICT FOR THE PURPOSE OF PROVIDING SANITARY SEWER SERVICE FROM AUBURN TO PROPERTY LOCATED WITHIN THE LAKEHAVEN UTILITY DISTRICTS SANITARY SEWER SERVICE AREA WHEREAS pursuant to RCW 35A11040 Auburn has the legal authority to exercise its powers and perform any of its functions as set forth in RCW 3934 and WHEREAS in January 2004 the Commissioners of the Lakehav43n Utility District adopted Resolution No 20041006 authorizing the General Manager to execute an interlocal agreement with Auburn which agreement was subsequently signed by the City of Auburn as authorized under Auburn Resolution No 3651 and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost and WHEREAS a single family residential development hereinafter referred to as Jovita HeightsWest Hill has been proposed that lies within the distinct Sanitary Sewer Service Areas of both Auburn and Lakehaven as established and described in the Original Agreement and Resolution No 3824 February 7 2005 Page 1 of 3 WHEREAS portions of the Auburn sanitary sewer system have been sized with sufficient wastewater conveyance capacity and are situated soas to be capable of affording sewer service to those portions of Jovita HeightsWest Hill that lie within both the Auburn Sanitary Sewer Service Area and the Lakehaven Sanitary Sewer Service Area and WHEREAS portions of the Lakehaven sanitary sewer system halve been sized with sufficient wastewater conveyance capacity and are situated so as to be capable of affording sewer service to those portions of Jovita HeightsWest Hill that lie within both the Lakehaven Sanitary Sewer Service Area and the Auburn Sanitary Sewer Service Area and WHEREAS the developer of Jovita Heights West Hill has requested that Auburn provide sanitary sewer service to theentire development Ito afford maximum efficiency in its use of existing and future facilities and WHEREAS Auburn has evaluated sanitary sewer service issues relative to the developers request and determined that it is feasible for Auburn to provide sanitary sewer service to the entire development NOW THEREFORE THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON HEREBY RESOLVES as follows Section 1 The Mayor is hereby authorized to execute an Interlocal Agreement with the Lakehaven Utility District in substantial conformity with the Resolution No 3824 February 7 2005 Page 2 of 3 agreement attached hereto marked as Exhibit 1 and incorporated herein by this reference Section 2 That the Mayor is authorized to implement such other administrative procedures as may be necessary to carry out the direCtives of this legislation Section 3 That this Resolution shall take effect and be in full force upon passage and signatures hereon Dated and Signed thisVay of nJrAA 2005 CITY OF AUBUR PE ER B LEWIS MAYOR ATTEST f2j Danielle E Daskam City Clerk Daniel B Heid City Attorney Resolution No 3824 February 7 2005 Page 3 of 3 LAKEHAYEN UTILITY DISTRICT KingCounty Washington Resolution No 20051038 ARESOLUTION of1he Board ofCommissioners of1he Lakehaven Utility District King County Washington approving an amendment to 1he sanitary sewer service boundilI wi1h 1he City of Auburn au1horizing 1he General Manager to execute an agreement reflecting such amendment on behalf of 1he District and amending District Resolution No 20041006 WHEREAS 1he District is au1horized under state law to provide water and sanitilI sewer service pursuant to adopted comprehensive plans and WHEREAS under au1hority ofexisting regulatory requirements 1he District and 1he City ofAuburn have determined to establish by interlocal agreement service area boundariesbetween their respective water and sewer systems and WHEREAS since 1he adoption of 1he sewer service area boundilI Auburn and the District have concluded that certain territory wi1hin 1he area designated for sewer service by the District would be better served by Auburn and WHEREAS Auburn and the District havediscussed terms for an agreement which would transfer the service jurisdiction for such area to Auburn and WHEREAS theBoard believing the transfer of service jurisdiction to be in the best interests ofthe District NOW THEREFORE BE IT RESOLVED as follows I The District hereby approves an amendment to 1he lnterlocal Agreement Establishing SanitilI Sewer Service Boundaries with the City of Auburn to provide that 1he area referenced inExhibit A shall hereinafter be includedwi1hin 1he service area jurisdiction ofthe City ofAuburn 2 The General Manager is hereby directed to execute an agreement with Auburn to provide for such transfer 3 Resolution No 20041006 is hereby amended in part to reflect 1he transfer of service jurisdiction herein 4 This Resolution shall be effective on the date ofadoption below ADOPTED by the Board of commissis of Lakehaven Uti District King County Washington at an open public meeting this D ayof m1 I 2005 Resolution No 20051038 Page 1 ATrEST itrł President and Commissi Yea Nay Abtain V Yea Nay Abtain LLd Se and Commissioner Yea Nay Abtain e Co ssioner Yea Nay Abstain 1119 V Yea Nay Abstain Approved as to form l Resolution No 20051038 Page 2 EXHIBIT 1 AMENDMENT NO1 TO THE LAKEHAVEN UTILITY DISTRICT AND CITY OF AUBURN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered intothis JJ day of htAliff2005 by and between LAKEHAVEN UTILITY DISTRICT a Washington municipal corporation hereinafter referred to as Lakehaven and the CITY OF JIUBURN a Washingtonmunicipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington as an amendment to the Interlocal Agreement dated Februalry 2 2004betweenthepartiesandexecutedonthe8thdayofJanuary2004andthe20thdayof January 2004 respectively hereinafter referred to as Original Agreement WITNESSETH WHEREAS in January 2004 the Commissioners of the Lakehaven Utility District adopted Resolution No 20041006 authorizing the General Manager to execute an interlocal agreement with Auburn which agreement was sUlbsequently signed by the City of Auburn as authorized under Auburn Resolution No 31551 and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customersat reasonable cost and WHEREAS a single family residential development hereinafter referred to as Jovita HeightsWest Hill has been proposed that lies withinthe distinct Sanitary SewerService Areas of both Auburn and Lakehaven as established and described in the Original Agreement and WHEREAS portions of the Auburn sanitary sewer system have been sized with sufficient wastewater conveyance capacity and are situated so as tobe capableofaffordingsewerservicetothoseportionsofJovitaHeightsWestHillthatliewithin both the Auburn Sanitary Sewer Service Area and the Lakehaven Sanitary Sewer Service Area and WHEREAS portions of the Lakehaven sanitary sewer system havebeen sized with sufficient wastewater conveyance capacity and are situated so as to be capableofaffordingsewerservicetothoseportionsofJovitaHeightsWestHillthtliewithin both the Lakehaven Sanitary Sewer Service Area and the Auburn Sanitary Sewer Service Area and WHEREAS the developer of Jovita HeightsWest Hill has requested that Auburn provide sanitary sewer service to the entire development to afford maximum efficiency in its use of existing and future facilities and Exhibit 1 Resolution No 3824 Page 1 of4 Amendment NO1to the Lakehaven Utility District and the City of Aubum Interlocal Agreement Establishing Sanitary Sewer Service Boundaries WHEREAS Auburn hasevaluated sanitary sewer service issues relative to the developers request and determined that it is feasible for Auburn to provide sanitary sewer service to the entire development and WHEREAS Lakehaven has evaluated the request and determined that conditioned on mitigation of the impacts incident thereto Lakehaven can transfer to Auburn that portion of its Sanitary Sewer Service Area that lies within Jovita HeightsWestHillsothatAuburncanprovidesanitarysewerservicetotheentire development NOW THEREFORE in consideration of their mutual covenants conditions and promises IT IS HEREBY AGREED by and between the parties hereto as follows ITEM ONE REVISION TO ATTACHMENT 1 OF THE ORIGINAL AGREEMENT Page 2 of 2 Attachment 1 of the Original Agreement is a graphical representation of the sanitary sewer service area boundary between Auburn andLakehaven as established in the Original Agreement Page Two of Attachment 1 as suchAttachment 1 is attached hereto and by this reference incorporated herein revises the sanitary sewer service area shown in the Original Agreement to reflect the transfer to Auburn of certain sanitary sewer service areas originally granted to Lakehaven more specifically those parcels located withinthe City of Auburn east of 56th Avenue South between South 336th Street and South 344th Street together with those parcels located outside the City of Auburn east of 55th Avenue South between South 340th Street and South 348th Street ITEM TWO REVISION TO ATTACHMENT 2 OF THE ORIGINAL AGREEMENT The legal description for the sanitary sewer service area boundary is revised to reflect the service area modification described in Item One of this Amendment Attachment 2 is attached hereto as the legal description of the revised sanitary sewer service area boundary and by this reference is incorporated herein ITEM THREEREVISION TO SECTION 1 Sewer Service Area Section One of the Original Agreement entitled Sewer Service Area is herebyamendedtohereinafterreadasfollows The parties have agreed to a mutual sewer service planning boundary as depicted on the maps attached hereto as Attachment 1 and as legally described in Attachment 2 which are by this reference each incorporated herein Both parties further agree that through this designation of the sanitary sewer service boundary Lakehaven shall provide sanitary sewer service to properties mutually within its revised sanitary sewer service area and Auburns PM also depicted on Attachment 1 while Auburn shall provide sanitary sewer service to properties located within its revised sanitary sewer service area including portions of Lakehavenscorporate boundary in accordance with and subject to the terms and conditions of this Agreement Exhibit 1 Resolution No 3824 Page 2 of 4 Amendment NO1to the Lakehaven Utility District and the City ofAuburn Interlocall Agreement Establishing Sanitary Sewer Service Boundaries ITEM FOUR REMAININGTERMS UNCHANGED That all other provisions of the Original Agreement not herein amended shall remain in full force and effect IN WITNESS WHEREOF the parties hereto have executed this agreement as of the day and year first below written LAKEHAVEN UTILITY DISTRICT Approved by Resolution No 105 I 03 of the Lakehaven UtilityDistric t Federal Way Washington at its regular meeting held on the I 0 day of M 1 2005 By DONALD T PE RY GENERAL MANAGER Lakehaven Utility District Approved as to form STEVENi OUNSEL Lakehaven Utility District Exhibit 1Resolution No 3824 Page 3 of4AmendmentNO 1 to the Lakehaven Utility District and the City ofAuburn Interlocal Agreement Establishing Sanitary Sewer Service Boundaries CITY OF AUBURN Approved by Resolution No 3824 of the City of Auburn Washington at its regular meeting held on the 2 day of J it rtlClI 2005 By J t PETER LEWIS Mayor City of Auburn Attest City Clerk City of Auburn Exhibit 1 Resolution No 3824 Page 4 of4 Amendment No 1 to the Lakehaven Utility District and the City of Auburn Interlocal AgreementEstablishingSanitarySewerServiceBoundaries I LEGEND REVISED ATTACHMENT 1 LAKEHAVEN AUBURN INTERLOCAL AGREEMENT ESTABLISHINGSANITARY SEWER SERVICI BOUNDARIESAUBURNCITYLIMITS AUBURN PAA PROPOSED SEWER SERVICE BOUNDARY INITIAL IFAPPROV1D J1I2oo5 Informotlo IIown IIfor purpoeuonrandnotIrpIIIoOlhID N flAUON PAGE 2 Attachment 2 REVISED LAKE HAVEN UTILITY DISTRICT and CITY OF AUIBURN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BOUNDARY DESCRIPTION BEGINNING at a point 170 feet east of the Northwest corner of the Southeast quarter of theSouthwest quarter of Section 35 Township 22 North Range 4 East WM in King County Washington THENCE south 66254feet more or less to the North line of the South half of said subdivision THENCE easterlyalong said North line to a point 300 feet west of the Eastline of said subdivision THENCE south to a point 170 feet north of the South line of said subdivisicn THENCE east 300 feet moreor less to the East line of said subdivision THENCE southerly along said East line to the South line of said Section 35 THENCE continuing southerly along the West line of the Northeast quartErof Section 2 Township 21 North Range 4 East WM in King County Washington Ii distance of 22112feet THENCE easterly parallel with the North line of said subdivision 22020fEt THENCE southerly parallel with the West line of said subdivision 130 feet THENCE easterly parallel with the North line of said subdivision 130444 feet THENCE southerly parallel with the West line of said subdivision 494 feelt THENCE easterly parallel with the North line of said subdivision 6808feEt THENCE southerly parallel with the West line of said subdivision 100 feelt THENCE easterly parallel with the North line of said subdivision 428 foet moreor less to the East line of said subdivision THENCE southerly along said East line to the Northeast corner of the South half of the South half of the Northeast quarter of the Southeast quarter of said Section 2 THENCE westerly along the North line of said subdivision 51877 feet THENCE southerly parallel with the East line of said subdivision 32801 fC3et Attachment 2 Resolution No 3824 Page 1 of4 Lakehaven Auburn IntecC81Agreement Establishing Sanitary Sewer Service Boundaries THENCE westerly along the South line of said subdivision 13002 feet moreor less to the Northeast corner of the West half of the Southeast quarter of the Southeast quarter of said Section 2 THENCE southerly along the East line of said subdivision 96441 feet THENCE westerly parallel with the North line of said subdivision 650 flret more or less to the East line of the Southwest quarter of the Southeast quarter of said Section 2 THENCE southerly along said East line 32877 feet moreor less to the South line of said subdivision THENCE westerly along said South line to the centerline of 56th Avenue South THENCE southerly along said centerline of 56th Avenue South to the lenterlineof South 305th Street in Section 11 Township 21 North Range 4 East WM in King County Washington THENCE westerly along said centerline of Soth 305th Street to a point of intersection with the northerly projection of the West line of Lot 2 Block 5 Auburn Heights Park Division No2 according to the plat thereof recorded in Volume 49 Page 99 records of King County Washington THENCE southerly 320 feet moreor less parallel with saidWest line of Lot 2 to the South line of Lot 4 Block 5 of said plat THENCE easterly along saidSouth line of Lot 4 to the Northwest corner of Lot 5 Block 5 of said plat THENCE southerly and southeasterly along the West lines of Lots 5 anld 9 of said plat to the Northeast corner of Block 7 Auburn Heights Park Division No1 according to the plat thereof recorded in Volume 49 of Plats Page 56 records of King County Washington THENCE southerly along the East line of Block 7 of said plat to the Southeast corner of Lot 2 Block 7 of said plat THENCE westerly parallel with the South line of said plat along the north lines of Lot 19 and Lot 1 Block 6 Lot 15 and Lot 1 Block 5 and Lot 26 Block 4 of said plat to the centerline of 51st Avenue South THENCE southerly along said centerline of 51st Avenue South to thEI Southwest corner of saidSection 11 THENCE continue southerly along the West line of Section 14 Township 21 North Range 4 East WM in King County Washington 32957 feet Attachment 2 Resolution No 3824 Page 2 of4 Lakehaven Auburn Intertocal Agreement Establishing Sanitary Sewer Service Boundaries THENCE east 30 feet to the Southwest corner of Lot 15 Peasley Ridge according to the plat thereof recorded in Volume 201 Pages 6671 records of King CountyWashington THENCE continue easterly along the South line of said plat to the Southeast corner of Tract D Peasley Ridge THENCE northerly along the East line of said Tract 0 150 feet moreor less to the Northwest corner of Lot 2 King County Short Plat No 1080026R as recorded under Recording No 8106080708 records of King County Washington THENCE easterly along the North line of said Lot 2 to the West line of Lot 1 King County Short Plat No 1080027 as recorded under Recording No 8106080709 records of King County Washington THENCE northerly along the West line of said Lot 1 to the Northwest corner thereof THENCE easterly along the North lines of Lots 1 2 and 4 of said short plat to the Northeast corner of said Lot 4 THENCE East 60 feet to the West line of Lot 19 West Auburn FiveAcre Tracts according to the plat thereof recorded in Volume 15 Page 12 records of King County Washington THENCE southerly along the West line of said Lot 19 943 feet THENCE easterly parallel with the North line of said Lot 19 2948 feet THENCE northerly parallel with the West line of said Lot 19 11943 fEet moreor less to the South margin of South 320th Street THENCE easterly along said south margin of South 320th Street 150 feet THENCE southerly parallel with the West line of said Lot 19 11943 feet THENCE easterly parallel with the North line of said Lot 19 959 feet THENCE southerly parallel with the West line of said Lot 19 5 feet THENCE easterly parallel with the North line of said Lot 19 1353 feet THENCE southerly parallel with the West line of said Lot 19 178866 fEet more or less to the most Northwesterly corner of Lot 4 King County Short Plat No 278048 as recorded under Recording No 8004030782 records of King County Washington THENCE southerly along the West line of said Lot 4 to the Southwest corner thereof and the North line of Lot 2 King County Short Plat No 1077053 as recrded under Recording No 7808100856 THENCE westerly along the North line of said Lot 2 to the Northwest corner thereof Attachment 2 Resolution No 3824 Page 3 of4 Lakehaven Auburn Interlocal Agreement Establishing Sanitary Sewer Service Boundaries THENCE southerly along the West lines of Lot 2 and Lot 4 of said short plat to the North line of Lot 30 West Auburn FiveAcre Tracts according to the plat thereof recorded in Volume 15 Page 12 records of King County Washington THENCE easterly along the North line of said Lot 30 14735 feet THENCE southerly parallel with the East line of said Lot 30 to the centerlline of South 324th Street THENCE westerly along saidcenterline of South 324th Street to the Interlineof 56th Avenue South THENCE southerly along said centerline of 56th Avenue South to the North margin of State Highway No 18 THENCE easterly along said North margin of State Highway No 18 to the southerly projection of the centerline of 58th Avenue South THENCE southerly along said centerline of 58th Avenue South to the North margin of South 336th Street THENCE westerly along said North margin of South 336th Street to the West margin of 56th Avenue South THENCE southerly along said West margin of 56th Avenue South to the North marginofSouth340thStreet THENCE westerly along said North margin of South 340th Street to the West marginof55thAvenueSouth THENCE southerty along said West margin of 55th Avenue South to the South marginofSouth348thStreet THENCE easterly along said South margin of South 348th Street to the Ealst margin of56thAvenueSouth THENCE northerly along said East margin of 56th Avenue South to the easterlyprojectionoftheSouthlineofLot24Block27JovitaHeightsaccordintotheplat thereof recorded in Volume 20 of Plats Page 12 records of King County Washington and the terminus of this boundary description Attachment 2 Resolution No 3824 Page 4 of4 Lakehaven Auburn Interlocal Agreement Establishing Sannary Sewer Service Boundaries RESOLUTION NO 3502 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITYCLERK TO EXECUTE AN INTERLOCAL AGREEMENT BETWEEN THE CITY OF AUBURN AND THE MUCKLESHOOT INDIAN TRIBE FOR THE OPERATION OF A TEMPORARY SEWAGE LIFT STATION WHEREAS the Muckleshoot Indian Tribe Tribe and the City of Auburn Auburn are authorized toenterintothis Agreement under the authority of their respective enabling legislation and under the authority of Chapter 3934 RCW the Interlocal Cooperation Act and WHEREAS the parties desire clarification on the ownership the maintenance and the operational responsibilities for a lift station serving the Swan Flats development and WHEREAS it is in the public interest for the parties herein toenterinto a sanitary sewer agreement for the operation of a sanitary sewer lift station to facilitate service from the Swan Flats plat NOW THEREFORE THE COUNCIL OF THE CITY OF AUBURN WASHINGTON IN A REGULAR MEETING DULY ASSEMBLED HEREWITH RESOLVES THAT Section 1 Pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and the Tribe have legal authority to cooperate with otherlocalities on the basis of mutual advantage and provision of services Resolution No 3502 July 112002 Page 1 Section 2 The Mayor and City Clerk of the City of Auburn are herewith authorized to execute the Interlocal Agreement between Auburn and the Tribe with minor administrative changes if required A copy of said Agreement is attached hereto denominated as Exhibit A and made a part hereof as though set forth in full herein Section 3 The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation Section 4 This resolution shall be in full force and effect upon passage and signatures hereon DATED this day of 2002 CITY OF AUBURN PETER B LEWIS MAYOR Resolution No 3502 July 112002 Page 2 ATTEST Danielle E Daskam City Clerk Daniel B Held City Attorney Resolution No 3502 July 11 2002 Page 3 Return Address Auburn City Clerk City of Auburn 25 West Main St Auburn WA 98001 20030714002726PACZFZCNUTTAG26 87242993 1521KZNGCOUNTYA RECORDERS COVER SHEET Document Titles or transactions contained therein Interlocal Agreement RES 3502 Sanitary Sewer Swan Flats Reference Numbersof Documents assigned or released IAdditional reference s on page of document GrantorsBorrowersLast name first then first name and initials Auburn City of GranteeAssigneeBeneficiary Last name first 1 Muckleshoot Indian Tribe Legal Description abbreviated ielot block plat or section township range PER RCW 3934 Additional legal is on page of document Assessors Property Tax ParcelAccount Number N Assessor Tax not yet assigned EXHIBIT A Interlocal Agreement between the MuckleshootIndian Tribe and the City of Auburn Sanitary Sewer Service for Swan Flats WHEREAS Flats for the WHEREAS conveyance system and THISINTERLOCAL AGREEMENTmade and entered into pursuant to the interlocal Cooperion Act chapter 3934 of RevisedCodeof Washington on the day of t 2002 by and between the CITY OF AUBURN a municipal corpation of the Stateof Washington hereinafter referred to as Auburn and the MUCKLESHOOT INDIAN TRIBE a federallyrecognized Indian Tribe located upon the Muckleshoot Indian Reservation hereinafter referred to as Tribe WITNESSETH the Tribe has purchased the singlefamily housingplat known as Swan construction of singlefamily homes and a temporary private sewage lift station is established to facilitate the of the Swan Flats wastewater into Auburns publicsanitary sewer WHEREAS the lift station required by the Swan Flats plat for sanitary sewer services shall be owned maintained and operated by the Tribe and WHEREAS once improvements havebeen made to the publicsanitary sewer system located along Academy Drive to facilitate gravity wastewater flow fromSwan Flats to the improved sewer line then Auburn shall bypass the private lift station and establish the piping required to connect Swan Flats plat with Auburnssewer system without the use of pumps and WHEREAS the property owners responsibility to own operate and maintain the sanitary sewer lift station servicing the Swan Flats plat was imposed upon the plat and is not being imposed upon the Tribe as a special condition and WHEREAS the Tribe and Auburn are willing toenter into this agreement which clarifies the maintenance responsibilities for the existing lift station servicing the Swan Flats plat and WHEREAS the Tribe has purchased a majority of the properties within the Swan Flats plat and desires to be the responsible party for the operation and maintenance of the private sanitary sewer lift station in lieu of a homeowners association EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 1 of 7 NOW THEREFORE in consideration of their mutual covenants conditions and promises THE PARTIES HERETO DO HEREBY AGREE as follows 1 CONDITIONS A Auburnshall install sanitary sewer pipe to bypass the Swan Flats lift station concurrent with any sanitary sewer improvements done to the existing public sewer line along Academy Drive that would facilitate gravity sewer service from Swan Flats B The Tribe shall own operate and maintain the lift station established upon Lot 1 of the Swan Flats plat until the gravity facilities are constructed and the pump station is no longer required for service C The Muckleshoot Indian Tribe shall post an all weather sign with a minimumletter height of one inch thatdetails the appropriate person andor agency and phone number of who to contact if the sewer lift station requires service The current contact information established by the Muckleshoot Indian Tribe for the servicing of the lift station is as follows DEWEY MILLER Muckleshoot Indian Tribe Public Works 3608024727 After hour phone numbers and emergency contacts shall be mentioned on the sign and supplied to Auburn 20 daysprior to the effective date of this Agreement D If Tribal response is delayed and the City is contacted and a health hazard is created due to the failure of the lift station then the City may respond to contain and possibly correct the health situation until Tribal response is onsite The Tribe agrees to reimburse the City for reasonable expenses for time and materials related to any such response E No connections shall be made to Auburns public sewer system without first obtaining the appropriate permits from the City as established within Auburn City Code 1320 F Upon installation of the sanitary sewer bypass of the Swan Flats lift station by the City the Tribe shall cap the existing eightinch PVC sewer pipe conveying wastewater from the Citys sewer system to the lift station at the property line to lot one The tribe may request that the City do this work at the time of the diversion at no costto the Tribe After connection to the City gravity sewer system the Tribe may dispose of or retain the lift station as it deems appropriate EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 2 of 7 2 INSURANCE The Tribe shall maintain at a minimum a two million liability insurance policy as of the effective date ofthis agreement the Tribe shall continue such insurance coverage during the term ofthis agreement unless otherWise agreed upon by the parties 3 INDEMNIFICATION A The Tribe agrees to indemnify and hold the City and its agents employees andor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever kind or nature broughtagainst the City arising out of in connection with or incident to the execution of this agreement andor the Tribes performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or result from the concurrent negligence of the City its agents employees andor officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of the Tribe and provided further that nothing herein shall require the Tribe to hold harmless or defend the City its agents employees andor officers from any claims arising from the sole negligence of the City its agents employees andor officers No liability shall attach to the City by reason of entering this agreement except as expressly provided herein B The City agrees to indemnify and hold the Tribe and its agents employeesandorofficersharmlessfromandshallprocessanddefendatitsownexpenseanyandallclaimsdemandssuitsatlaworequityactionspenaltieslosesdamagesor costs of whatsoever king or nature brought against the Tribe arising out of in connection with or incident to the execution of this agreement andor the Citys performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or resultfrom the concurrent negligence of the Tribe its agents employees andor officers this indemnity provision shall be valid and enforceable only to the extent of the negligence of the City and provided further that nothing herein shall require the City to hold harmless or defend the Tribe its agents employees andor officers from any claims arising from the sole negligenceoftheTribeitsagentsemployeesandorofficersNoliabilityshallattachtothe Tribe by reason of entering this agreement except as expressly provided herein 4 COMPLIANCE WITH REGULATIONS AND LAWS The parties shall comply with all applicable rulesand regulations pertaining to them in connection with the matters covered herein 5 DISPUTE RESOLUTION AND LIMITED WAVIER OF SOVEREIGN IMMUNITY A In the event the Tribe and the City are engaged in a dispute whichrelates to this Agreement and they are unable to resolve said dispute within ninety 90 EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 3 of 7 days either party may request mediationof any dispute in any manner agreed upon by the parties a Mediation shall be commenced by the party requesting it by notifying the other party in writing of its request to mediate a dispute arising between the parties which relate to sanitary sewer and sewer related services to Swan Flats If the parties agree toenterinto mediation within twenty 20 days from such request the matter shall bedeemed stayed and the arbitrationclausecontinued herein shall not be put into effect Mediation shall continue for nomore than one hundred and twenty 120 days at which point the mediation shall be deemed failed unless the parties have reached an agreement andhave had such agreement approved by the governing bodies If such agreement is not approved by the governing bodies of each respective party or is not enforceable in the United States District Court for the Western District of Washington the Mediation shall bedeemed failed and the unresolved issue shall be submitted to binding arbitration as set forth herein b In the event the parties do not reach an agreement to mediate within twenty 20 days of receipt of the notice requesting mediation by the nonrequesting party the matter shall be submitted to binding arbitration as set forth herein c Each party shall bear its own cost of mediation B Any controversy or claim arising out of or relating to this agreement or the breach thereof shall be settled by arbitrationadministered by the American Arbitration Association in accordance with its applicable rules Judgment on the decision rendered by the arbitrator may be entered into the United States District Court for the Western District of Washington Each party shallbear its own costs of arbitration C The Tribe hereby waives its sovereignimmunity and consents to the jurisdiction of the United States District Court for the Western District of Washington concerningdisputed regarding the interpretation of this Agreement and the enforcement of any rights hereunder including other obligations or liabilities in law or in equity pertaining to immunity provisions of this Agreement Such waiver of SovereignImmunity and Consent to jurisdiction shall apply to no other court D The Tribe agrees that the Muckleshoot Indian Tribal Court has no jurisdiction over the force effect and interpretation ofthis Agreement nor the resolutionof disputes that pertain to its implementation The Tribe further agrees that it has no authority to submit the City to the jurisdiction of the Muckleshoot Indian Tribal Court with regards to any sewerrelated matters or disputes which may arise between the parties 6 ASSIGNMENT The parties shall not assign this agreement or any interest obligation or duty therein without the express written consent of the other party EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 4 of 7 7 ATTORNEYS FEES If either party shall be required to bring any action to enforce any provision of this Agreement or shall be required to defend any action brought by the other party with respect tothis Agreement and in the further event that one party shall substantiallyprevailinsuchactionthelosingpartyshallinadditiontoallotherpaymentsrequiredthereinpayalloftheprevailingpartysreasonablecostsinconnectionwithsuch action including such sums as the court or courts may adjudge reasonable as attorneysfees in trial court and in appellate courts 8 NOTICES All notices between the two agencies hereunder may be delivered or mailed If mailed they shall be sent to the following respective addresses The Muckleshoot Indian Tribe Thomas Reber Muckleshoot Indian Tribe Assistant Tribal Operations Manager Community Development 40320 Auburn Enumclaw Road Auburn WA 98092 Phone 3608021922 Fax 3608024727 The City of Auburn Jeff Roscoe Sanitary Sewer Engineer Auburn Public Works Department 25 West Main Street Auburn WA 980014998 Phone 2539314008 FAX 2539313053 or to such other representative addresses as either party may hereafter from time to time designate in writing All notices and payments mailed by regular postincludingfirstclassshallbedeemedtohavebeengivenonthesecond business day following the date of mailing if properly mailed and addressed Notices and payments sent by certified or registered mail shall be deemed to have been given on the day next following the date of mailing if properly mailed and addressed For all types of mail the postmark affixed by the United States Postal Service shall be conclusive evidence of the date of mailing 9 NONDISCRIMINATION Each of the parties for itself its heirs personal representatives successors in interest and assigns as part of the consideration hereof does hereby covenant and agree that it will comply with applicable statutes executive orders and such rules as are promulgated to assure that no person shall on the grounds of race creedcolor national origin sex age or the presence of any sensory mental or physical handicap be discriminated against or receive discriminatory treatment by reason thereof 10 INTEGRATION This agreement constitutes the entire agreement of the partiesregarding the subject matter hereof and there areno other representations or oral agreements EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Page 5 of 7InterlocalAgreementSwanFlats other than those listed herein which vary the terms ofthis agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 11 OBLIGATION INTACT Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of eitherthe Tribe or the City regardingprovision of sewer service except as specifically set forth herein 12 MISCELLANEOUS A The captions in this agreement are for convenience only and do not in any way limit or amplify the provisions of this agreement B The duration ofthis agreement shall be until the sanitary sewer improvements are established that will allow the City to extend a gravity sewer main to bypass the private lift station or for the period of time it reasonably takes for the performance of parties as completed herein C The purpose of this agreement is to clarify the Tribes role for the maintenance and operation of the private lift station together with the Citys role in the establishment of a gravity sewer system to serve Swan Flats D The performances of the duties of the parties provided hereby shall be done in accordance with standard operating procedures and customary practices of the parties E No provision ofthis agreement shall relieve either party of its public agency obligations andor responsibilities imposed by law F If any term provision condition or portion of this Agreement isheld to be invalid or unenforceable by a final decision of any court having jurisdiction on the matter the remaining ofthis Agreement or the application of such term or provision to persons or circumstances other then those as to which it is held invalid or unenforceable shall not be affected thereby and shall continue in full force and effect G No modifications or amendments ofthis agreement shall be valid or effective unless evidenced in writing and signed by both parties EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 6 of 7 IN WITNESS WHEREOF the parties hereto have executed this agreement as of the day and year first above written MUCKLESHOOT INDIAN TRIBE PASSED by Resolution No 02235of the Muckleshoot Indian Tribe at its special meeting held on the 2nd day of August 2002 By OHN DANIELS JR CFIR Date CITY OF AUBURN PASSED by Resolution No 3502 of the City of Auburn Washington at its regularmeeting held on the 5th day of August 2002 By Z 2 PETER B L Date Attest Apprpved as to form DanielB Heid OitY AttorneY EXHIBIT A Resolution 3502 Muckleshoot Indian Tribe Auburn Interlocal Agreement Swan Flats Page 7 of 7 RESOLUTION NO 4 33 5 A RESOLUTION OF THE CITYCOUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICE BOUNDARIES BETWEEN THE CITY OF AUBURN AND THE CITY OF PACIFIC WHEREAS pursuant to RCW 35A11040 and RCW 35A21150the City of Auburn Auburn and the City of Pacific Pacific have the authority to exercise a wide variety of municipal powers including providing sewer service and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and Pacific have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of municipal services and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customersat reasonable cost and WHEREAS portions of the Auburn sanitary sewer system havebeen sized and are situated soas tobe capable of affordingpublicsanitary sewer service to a portion of Pacific and WHEREAS Pacific has evaluated and determined it is in Pacificsbest interest to allow Auburn to provide sanitary sewer service to property within Resolution No 4335 April 29 2008 Page 1 of 3 Pacifics municipalboundary that lies in the vicinity of Auburnssanitary sewer infrastructure and WHEREAS Auburn has sufficient wastewater conveyance capacity within their sanitary sewer facilities to support these adjustments to the existing sanitary sewer service areas and WHEREAS Auburnsdelivery of sanitary sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE THE COUNCIL OF THE CITY OF AUBURN WASHINGTON IN A REGULAR MEETING DULY ASSEMBLED HEREWITH RESOLVES THAT Section 1 The Mayor and City Clerk of the City of Auburn are herewith authorized to execute an Interlocal Agreement establishingsanitary sewer service boundaries between the City of Auburn and the City of Pacific which agreement shall be in substantial conformity with the Agreement a copy of which is attached hereto marked as Exhibit A and incorporated herein by this reference Section 2 The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directivesof this legislation Resolution No 4335 April 29 2008 Page 2 of 3 Section 3 This resolution shall be in full force and effect upon passage and signatures hereon DATED this day of 2008 CITY OF AUBURN r PETER B LEWIS MAYOR ATTEST Danielle E Daskam City Clerk APPROVEUATO FORM niel B Ham Ci Resolution No 4335 April 29 2008 Page 3 of 3 INTERLOCALAGREEMENT between CITY OF PACIFIC and CITY OF AUBURN for the THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered into by and between the CITY OF PACIFIC a Washingtonmunicipal corporation hereinafter referred to as Pacific and the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35A11040 Auburn and Pacific have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn and Pacific have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150Auburn and Pacific have the legal authority to maintain a sewerage system and WHEREAS the parties recognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost and WHEREAS portions of the Auburn sanitary sewer system have been sized and are situated soas to be capable of affording publicsanitary sewer service to a portion of Pacific and WHEREAS Pacific has evaluated and determined it is in Pacificsbest interest to allow Auburn to provide sanitary sewer service to property within Pacifics municipalboundary that lies in the vicinity of Auburnssanitary sewer infrastructure and WHEREAS Auburn has sufficient wastewater conveyance capacity within their sanitary sewer facilities to support these adjustments to the existing sanitary sewer service areas and Exhibit A Pacific Auburn Interlocal Agreement forthe Resolution No 4335 Establishment of Sanitary Sewer Service Boundaries Page 1 of 7 WHEREAS the parties desire to allow Auburn to construct reconstruct repair and maintain sewer facilities and to authorizeconnections to Pacificssewer system forservice to the areas noted in Attachment A and WHEREAS Auburns delivery of sanitary sewer service to these areas will provide the maximum efficiency in the use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed that Auburn will provide sanitary sewer service to a portion of Pacific as graphicallydepicted on the map attached hereto as Attachment A which is by this reference incorporated herein Both parties further agree that Auburn in providing sewer service to the areaas shown on Attachment A shall be furnishing sewer service to properties within Pacificswater service area and Pacifics municipal jurisdiction in accordance with and subject to the terms and conditions of this Agreement 2 Management Regulation and Control of Sewer System Auburn shall have the sole responsibility and authority to construct maintain manage and operate its sewerage system as installed within the areas described in Attachment A together with any additions extensions and betterments thereto Auburn shall also be responsible for obtaining all necessary governmental franchises approvals easements and permits for the installation maintenance and operation of said sewerage systems as described above 3 Rates Charges Permits and Billing Responsibilities Through this Agreement Auburn will be responsible to own operate and maintain the sanitary sewer system including private side sewers withinthe public right of way Auburn shall issue certificates of sewer availability when requested by the property owners No connection or modification shall be made to Auburns sanitary sewer system and or private side sewer services connected to Auburns sewer system unless the property owner first pays the associated fees and submits the proper information to obtain an Auburn sanitary sewer permit Sanitary sewer permits shall be subject to inspection and approval for compliance with Auburns Sanitary Sewer Standards as adopted at the time the connection is made The rates charged to Auburns sanitary sewer customers shall be fixed altered regulated and controlled by Auburn pursuant to all applicable laws or regulations promulgated on the subject of rates and charges for sewer service No surcharge shall be charged to the customers served under this agreement on the sole basis that those customers are outside of Auburns city limits Exhibit A Pacific Auburn Interlocal Agreement for the Resolution No 4335 Establishment of Sanitary Sewer Service Boundaries Page 2 of 7 To establish a quantitative usage Pacific shall provide to Auburn the quantity of potable water used by those properties connected to Auburns sanitary sewer system Pacific shall provide water usage information every other month to Auburn and Auburn shall send a bill every other month for sewer service Pacific shall give Auburn the right to read water meters described in Attachment A manually if desired by Auburn Auburn shall also have the ability to annually request water usage data from Pacific for said properties 4 Boundary Review Board Pacific and Auburn will at the time of service through this agreement provide a copy of to the King County Boundary Review Board in accordance with RCW3693090 5 Comprehensive Sewer Planning The terms of this Agreement will be included asan element of Auburn and Pacifics ComprehensiveSewerage Plans 6 Reliance Each party hereto acknowledges that the other will rely upon the terms of this agreement in its comprehensive planning to meet the needs of the service area designated herein 7 Indemnification Pacific agrees to indemnify and hold Auburn and its agents employees andor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs ofwhatsoever kind or nature brought against Auburn arising out of in connection with or incident to the execution of this agreement andor Pacifics performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or result from the concurrent negligence of Auburn its agents employees andor officers this indemnityprovision shall be valid and enforceable only to the extent of the negligence of Pacific and provided further that nothing herein shall require Pacific to hold harmless or defend Auburn its agents employees andor officers from any claims arising from the sole negligence of Auburn its agents employees andor officers No liability shall attach to Auburn by reason of entering this agreement except as expressly provided herein Auburn agrees to indemnify and hold Pacific and its agents employees andor officers harmless from and shall process and defend at its own expense any and all claims demands suits at law or equity actions penalties loses damages or costs of whatsoever king or nature broughtagainst Pacific arising out of in connection with or incident to the execution of this agreement andor Auburns performance or failure to perform any aspect of this Agreement provided however that if such claims are caused by or result from the concurrent negligence of Pacific its agents employees andor officers this indemnityprovision shall be valid and enforceable only to the extent of the negligence of Auburn and provided further that nothing herein shall require Auburn to hold harmless or defend Pacific its agents employees andor officers from any claims arising from the sole negligence of Exhibit A Pacific Auburn Interlocal Agreement for the Resolution No 4335 Establishment of Sanitary Sewer ServiceBoundaries Page 3 of 7 Pacific its agents employees andor officers No liability shall attach to Pacific by reason of entering this agreement except as expressly provided herein 8 Assignment The parties shall not assign this agreement or any interest obligation or duty therein without the express written consent of the other party 9 Attorneys Fees If either party shall be required to bring any action to enforce any provision of this Agreement or shall be required to defend any action brought by the other party with respect to this Agreement and in the furtherevent that one party shall substantially prevail in such action the losing party shall in addition to all other payments required therein pay all of the prevailing partys reasonable costs in connection with such action including such sums as the court or courts may adjudge reasonable as attorneys fees in trial court and in appellate courts 10 Government Approvals The parties will give notice of the adoption of this Agreement to King Countys Department of NaturalResources Wastewater Treatment Division to the Department of Health and to any other agency with jurisdiction or mission relevant to the terms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof by those agencies 11 Service Amendments Any changes to the service areas described herein shall be by mutual agreement Each party may give permission to the other on a casebycase basis to provide service by one party into the other partys adjacent or nearby service area based upon considerations ofeconomic efficiency for providing the service with mutual consent of Auburns Director of Public Works and Pacifics Director of Public Works 12 Notices All notices between the two agencies hereunder may be delivered or mailed If mailed they shall be sent to the following respective addresses City of Pacific Director of Public Works PO Box 250 100 3rd Avenue SE Pacific WA 98047 2538332741 City of Auburn Director of Public Works 25west Main Street Auburn WA 98001 2539313010 or tosuch other representative as either party may hereafter from time to time designate in writing All notices and payments mailed by regularpost including first class shall be deemed to havebeen given on the secondbusiness day following the date of mailing if properly mailed and addressed Notices and payments sent by certified or registered mail shall be deemed to havebeen given on the day next Exhibit A Pacific Auburn Interlocal Agreement for the Resolution No 4335 Establishment of Sanitary Sewer ServiceBoundaries Page 4 of 7 following the date of mailing if properly mailed and addressed For all types of mail the postmark affixed by the United States Postal Service shall be conclusive evidence of the date of mailing 13 Alteration Amendment or Modification Pacific and Auburn hereby reserve the right to alter amend or modify the terms and conditions of this Agreement upon written agreement of both parties to such alteration amendment or modification Such written consentsshall be filed with this agreement for future reference 14 Sanctity of Agreement This agreement constitutes the entire agreement of the parties regarding the subject matter hereof and there are no other representations or oral agreements other than those listed herein which vary the terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 15 Obligation Intact Nothing herein shall be construed to alter the rights responsibilities liabilities or obligations of either Pacific or Auburn regarding provision of sewer service except as specifically set forth herein 16 Miscellaneous A The captions in this agreement are for convenience only anddo not in any way limit or amplify the provisions of this agreement B This agreement is established in perpetuity Modifications can be established upon written agreement between both parties C The purpose ofthis agreement is to clarify Pacific and Auburns sanitary sewer responsibilities for providing service and maintaining public sewer facilities D If any term provision condition or portion of this Agreement is held to be invalid or unenforceable by a final decision of any court having jurisdiction on the matter the remaining of this Agreement or the application of such term or provision to persons or circumstances other then those as to which it is held invalid or unenforceable shall not be affected thereby and shall continue in full force and effect unlesssuch court determines that invalidity or unenforceability materially interferes with or defeats the purposes hereof at which time Auburn or Pacific shall have the right to terminate the Agreement E No modifications or amendments of this agreement shall be valid or effective unless evidenced by an agreement in writingsigned by both parties Exhibit A Pacific Auburn Interlocal Agreement for the Resolution No 4335 Establishment of Sanitary Sewer Service Boundaries Page 5 of 7 IN WITNESS WHEREOF the parties hereto have executed this agreement as of the day and year first above written CITY OF PACIFIC Approved by Resolution No 26 regularmeeting held on the day of of the City of Pacific Washington at its 2008 By RICHARD HILDRETH Mayor City of Pacific Attest lccC 6se SANDY PAULLYLE City Clerk City of Pacific Appr as to form ALBERT A ABUAN City Attorney City of Pacific CITY OF AUBURN Approved by Resolution No of the City of Auburn Washington at its regularmeeting held on the s day of 2008 By PETER B LEWIS Mayor City of Auburn Attest 1 DA LLE DASKAM City Clerk City of Auburn Exhibit A Resolution No 4335 Page 6 of 7 Pacific Auburn Interlocal Agreement for the Establishment of Sanitary Sewer Service Boundaries Ulty Attorney Ulty of Auburn 33510ODSI 36210490 PARCELS TO BE ADDED 885500005 TO AUBURNS SANITARY s00080 Q 384101W73 SEWER SERVICE AREA o AVENUE z w 335440WW tr 0 ez zoc xz J L D M vlFl C J r 4 019WASHINGTON 1 200 ATTACHMENTA PACIFIC AUBURN SANITARY SEWER SERVICE AGREEMENT Exhibit A Resolution No 4335 Page 7 of 7 CITY OF PACIFIC WASHINGTON cc Pry RESOLUTION NO 730 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PACIFIC WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHINGSANITARY SEWERSERVICE BOUNDARIES BETWEEN THE CITY OF PACIFIC AND THE CITY OF AUBURN WHEREAS pursuant to RCW 35A11040Pacific andAuburn have the legal authority to exercise their powers and perform any of their functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburnand Pacific have the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150Auburnand Pacific have the legal authority to maintain a sewerage system BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PACIFIC WASHINGTON AS FOLLOWS Section 1 The Mayor and City Clerk of the City of Pacific are herewith authorized to execute an Interlocal Agreementestablishing sanitary sewer service boundaries between the City of Pacific and the City of Auburn A copy of said Agreement is attached hereto as Exhibit 1 and made a part hereof as though set forth in full herein Section 2 The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation PASSED BY THE PACIFIC CITY COUNCIL AT A REGULAR MEETING THEREOF ON THE 12TH DAY OF MAY 2008 CITY 0 FIC Mayor Richard Hildreth ATTESTAUTHENTICATED Sandy Paul Ly e City Clerk Approved as t orm Ibert Abuan City Attorney Filed with the City Clerk May 1 2008 Passed by the City Council May 12 2008 Resolution No 730 Effective May 12 2008 RESOLUTION NO 3321 A RESOLUTION OF THE CITYCOUNCIL OF THE CITY OF AUBURN WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN INTERLOCAL AGREEMENT ESTABLISHING SANITARY SEWER SERVICEBOUNDARIES BETWEEN THE CITY OF AUBURN AND THE soOs CREEK WATERAND SEWER DISTRICT WHEREAS pursuant to RCW 35A11040 Auburn has the legal authority to exercise its powers and perform any of its functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn has the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150 Auburn has the legal authority to maintain a sewerage system and WHEREAS pursuant to RCW 5708044 Soos Creek Water and Sewer District has the legal authority to provide sewer service to property owners in areas outside existing district boundaries and WHEREAS pursuant to RCW 5708044 Soos CreekWater and Sewer District has the legal authority to enter into contracts with any municipal corporation for the purpose of providing sewer service to those property owners outside the existing district boundaries Resolution No 3321 020601 Page 1 of3 NOW THEREFORE THE COUNCIL OF THE CITY OF AUBURN WASHINGTON IN A REGULAR MEETING DULY ASSEMBLED HEREWITH RESOLVES THAT Section 1 The Mayor and City Clerk of the City of Auburn are herewith authorized to execute an Interlocal Agreement establishing sanitary sewer serviceboundaries between the City of Auburn and Soos Creek Water and Sewer District District A copy of said Agreement is attached hereto denominated as Exhibit 1 and made a part hereof as though set forth in full herein Section 2 The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry outthe directives of this legislation DATED thisoday of 2001 CITY OFAUBURN CHARLES A BOOTH MAYOR Resolution No 3321 020601 Page 2of3 ATTEST Danielle E Daskam City Clerk APPROVEDAS TO FORM Mchael O Reynolds City Attorney Resolution No 3321 020601 Page 3 of3 Return Address Auburn City Clerk City of Auburn 25 West Main St Auburn WA 98001 RECORDERS COVER SHIET Document Titles or transactions contained thereinoPJT afg INTERLOCAL AGREEMENT BETWEEN CITY OF AUBURN AND THE SOOS CREEK WATER SEWER DISTRICT FOR THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES Reference Numbersof Documents assigned or releasedIAdditionalreferencesonpageofdocument GrantorsBorrowersLast name first then first name and initials CITY OF AUBURN SOOS CREEK WATER SEWER DISTRICT GranteeAssigneeBeneficiary Last name first CITY OF AUBURN SOOS CREEK WATER SEWER DISTRICT Legal Description abbreviated ielot block plat or sectiontownship range PER RCW 3934 Additional legal is on page of document AssessorsProperty Tax ParcelAccount Number PER RCW 3934 Assessor Tax not yet assigned doous for I1 oy hm n blln eamioeda8 to proper er SOOS CREEK WATER AND SEWER DISTRICT and CITY OF AUBURN INTERLOCAL AGREEMENT FOR THE ESTABLISHMENT OF SANITARY SEWER SERVICE BOUNDARIES THIS AGREEMENT made and entered into this 21st day of March 2001 by and between the SOOS CREEK WATER AND SEWER DISTRICT a Washington municipal corporation hereinafter referred to as Soos Creek and the CITY OF AUBURN a Washington municipal corporation hereinafter referred to as Auburn both being duly organized and existing under and by virtue of the laws of the State of Washington WITNESSETH WHEREAS pursuant to RCW 35A11040 Auburn has the legal authority to exercise its powers and perform any of its functions as set forth in RCW 3934 and WHEREAS pursuant to RCW 3934 the Interlocal Cooperation Act Auburn has the legal authority to cooperate with other localities on the basis of mutual advantage and provision of services and WHEREAS pursuant to RCW 35A21150Auburn has the legal authority to maintain a sewerage system and WHEREAS pursuant to RCW 5708044 Soos Creek has the legal authority to provide sewer service to property owners in areas outside existing district boundaries and WHEREAS pursuant to RCW 5708044 Soos Creek has the legal authority toenterinto contracts with any municipal corporation for the purpose of providing sewer service to those property owners outside the existing district boundaries and WHEREAS the partiesrecognize the responsibility of publicsanitary sewer utilities to provide efficient and reliable service to their customers at reasonable cost and WHEREAS Auburn desires new development within its Potential Annexation Area to complete a Preannexation agreement with Auburn prior to receiving a certificate of sanitary sewer availability and WHEREAS portions of the Soos Creek sanitary sewer system have been sized and are situated so as tobe capable of affording sewer service to a portion of Auburns Potential Annexation Area and Exhibit 1 Resolution No 3321 Page 1 of 6 WHEREAS Auburn has evaluated and determined it is not cost feasible to provide sewer service to those properties located within Auburns Potential Annexation Area adjacent to Soos Creekssanitary sewer infrastructure and WHEREAS the parties desire to allowSoos Creek to construct reconstruct repair and maintain sewer facilities as necessary and to authorize connections for service to noted areas or portions thereof and WHEREAS Soos Creeks sewer service to these areas will provide for maximum efficient use of existing and future facilities together with orderly and efficient sanitary sewer planning NOW THEREFORE IT IS HEREBY AGREED by and between the parties hereto as follows 1 Sewer Service Area The parties have agreed to a permanent sewer service area boundary between them The boundary is graphically depicted on the map attached hereto as Exhibit A which is by this reference incorporated herein Both parties further agree that Soos Creek in providing sewer service to the area shown on Exhibit A as Area To Be Served By Soos Creek shall be furnishing sewer service to properties within AuburnsPotential Annexation Area Soos Creek shall provide service in accordance with and subject to theterms and conditions of this Agreement 2 Service Area Responsibility Auburn shall have responsibility to provide sanitary sewer service to the areas on Auburnsside of the respective service area boundaries as delineated by this agreement whether or not annexed to Auburn and subject to such reasonable conditions and terms of service as Auburn deems appropriate Soos Creek shall have responsibility to provide sanitary sewer service to the areas on Soos Creeks side of the respective service area boundaries as delineated by this agreement whether or not annexed to Auburn and subject to such reasonable conditions and terms of service as Soos Creek deems appropriate Auburn hereby gives consent to Soos Creek for such service withinSoos Creeks corporate boundaries as they presently exist or as they may be modified in the future by annexation Soos Creek shall be responsible for obtaining all necessary governmental franchises approvals easements and permits for the installation of said sewerage system within their delineated boundary 3 Sewer Availability Certificates Both parties acknowledge that Auburn may exercise planning jurisdiction over territory towhich it willnot provide sanitary sewer service in accordance with this agreement Auburn hereby agrees that its planning shall be for sanitary sewer service tobe provided by Soos Creek in those areas shown in Exhibit A as Soos Creeks service area provided however that commencing on March 1 2001 Soos Creek sewer availability certificates for all Exhibit 1 Resolution No 3321 Page 2 of 6 service areas to be served by Soos Creek within Auburn andor AuburnsPotential Annexation Area PAA in accordance herewith shall be issued to applicants for sewer service only through Auburn 4 Soos Creek Comprehensive Sewer Planning Area The terms of this agreement will be included as an element of Soos CreeksComprehensive Sewerage Plan Soos Creek will submit to Auburn all Comprehensive Sewerage Plans thereto involving area andor system improvements within Auburns planning area The Comprehensive Sewerage Plans and amendments shall be in compliance with Auburns Standards for sanitary sewer service within Auburn andor Auburns PAA except where preexisting facilities may differ from Auburnsstandards As facilities are replaced or as new facilities are planned and constructed within Auburn andor Auburns PAA they shall conform to Auburns service and facility standards for sanitary sewer service then in effect 5 Auburn Comprehensive Plan The terms of this agreement will be included as an element of the sewerage portion of AuburnsComprehensive Plan and Soos CreeksComprehensive Plan 6 Future Annexations Each of the parties agree that Soos Creek shall provide sanitary sewer service to the areas shown in Exhibit A without regard to the present corporate limits of the parties and without regard to future corporate limits as they may be amended by annexation to either party 7 Reliance Each party hereto acknowledges that theterms hereof will be relied upon by the other in its comprehensive planning to meet the needs of the service area designated herein 8 Liability Neither party to this agreement shall be liable for any failure or interruption of service in the service area of the other party as designated herein except as may be specifically caused by the other party 9 Government Approvals The parties will give notice of the adoption of this Agreement to MetropolitanKing County to the Department of Ecology to the Department of Health and to any other agency with jurisdiction or mission relevant to theterms hereof and shall cooperate and assist in all reasonable manner in procuring any necessary approvals hereof by those agencies 10 Boundary Review Board In the event that implementation of theterms hereof results in permanent sewer service to areas that will be outside the respective service boundaries of Soos Creek or Auburn the parties will at the time of such service jointly seek approval of the King County Boundary Review Board in accordance with RCW 3693090 Exhibit 1 Page 3 of 6 Resolution No 3321 11 Service Amendments Any changes to the service areas described herein shall be by mutual agreement Each party may give permission to the other on a casebycase basisto provide service by one party into the other partys adjacent or nearby service area based upon considerations of economic efficiency for providingtheservicewithmutualconsentofAuburnsDirectorofPublicWorksandSoos CreeksDistrict Manager 12 Alteration Amendment Modification or Termination Soos Creek and Auburn hereby reserve the right to alter amend modify or terminate the terms and conditions of this Agreement upon consent of both Parties given in writing 13 Indemnification and Hold Harmless Each Party hereto agrees to protect defend and indemnify the other Party its officers officials employees and agents from any and all cost claims judgements andor awards of damages arising out of or in any way resulting from the Partys default failure of performance or negligent conduct associated with this agreement by the Party its employees subcontractors or agents Each Party agrees that its obligations underthis provision extend to any claim demand andor cause of action brought by oron behalf of any of its employees or agents The foregoing indemnity is specifically and expressly intended to constitute a waiver of each Partys immunity under Washingtons Industrial Insurance Act RCW Title 51 as respects the other Party only and only to the extent necessary to provide each Party with a full and completeindemnity of claims made by the other Partys employees The Parties acknowledge that these provisions were specifically negotiated and agreed upon by them In the event either Party incurs any costs including attorney fees to enforce the provisions of this article and prevails in such enforcement action all such costs and fees shall be recoverable from the losing Party The provisions of this section shall survive the expiration or earlier termination of this agreement with regard to any event that occurred prior to oron the date of such expiration or earlier termination 14 Dispute Resolution In the event that any dispute arises between the Parties either Party may request in writing that the issue in dispute be resolved by Mediation and if necessary binding Arbitration In the event the matter cannot be resolved by the mediation process then it shall go promptly to binding Arbitration with no right of appeal Arbitration shall be by the American Arbitration Association or by such other entity as the Parties agree 15 Sanctity of Agreement This agreement constitutes theentire agreement of the partiesregarding the subject matter hereof and there areno other representations or oral agreements other than those listed herein which vary the Exhibit 1 Resolution No 3321 Page 4 of 6 TIt1FI terms of this agreement Future agreements may occur between the parties to transfer additional or future service areas by mutual agreement 16 Obligation Intact Nothing herein shall be construed to alter the rightsresponsibilitiesliabilitiesorobligationsofeitherSoosCreekorAuburnregardingprovisionofsewerserviceexceptasspecificallysetforthherein SOOS CREEK WATER AND SEWER DISTRICT Approved by Resolution No 2141S of the Soos Creek Water and Sewer District Washington at its regular meeting held on the 21st day of Harch 2001 By Karen L Webster Approved as to form Soos CreekAttorne c Attest Exhibit 1 Resolution No 3321 Page 5 of 6 CITY OF AUBURN Approved by Resolution No 3321 of the City of Auburn Washington at its regular meeting held on the7 tday of t 2001 By Attest Charles A Booth Mayor Appred Michael Reynolds City AEorney Danielle Daskam City Clerk Exhibit 1 Resolution No 3321 Page 6 of 6 PORTON OF SEC 33 34 T22 P5 AND PORTIONS OF SEC3 4 321 P5 KING COUNTY WA no OLJ O PORTON OF SEC 33 34 r22 RS AND PORrIoNs OF SEC 3 4 121 R5 KING COUNTY WA 00 riIl 1 EXHIBIT A CITY OF AUBURN SODS CREEK JUNE2000 WATER SEWER DISTRICT LEGEND INTERLOCAL AGREEMENT mmm m SCWSD CORPORATE BOUNDARY PROPOSED SEWER SERVICE PLANNING AREAS SCWSDSEWER PLANNING AREA BOUNDARY CITY OF KENT CORPORATE BOUNDARY APPROVAL CITY OF AUBURN SEWER SERVICE AREA BOUNDARY SEWER SERVICEDIVISION LINE OOCREEK W DISTRICT CITY OF AUBURN ilI I I LT GO 1 CR DI STRICT l I A SEWER SERVICEAREA X City of Auburn Comprehensive Sewer Plan B-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Appendix B: Hydraulic Capacity Analysis Technical Memorandum Limitations: This is a draft memorandum and is not intended to be a final representation of the work done or recommendations made by Brown and Caldwell. It should not be relied upon; consult the final report. This document was prepared solely for the City of Auburn in accordance with professional standards at the time the services were performed and in accordance with the contract between the City of Auburn and Brown and Caldwell dated December 6, 2013. This document is governed by the specific scope of work authorized by the City of Auburn; it is not intended to be relied upon by any other party except for regulatory authorities contemplated by the scope of work. We have relied on information or instructions provided by the City of Auburn and other parties and, unless otherwise expressly indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information. 701 Pike Street Suite 1200 Seattle, WA 98101 T: 206.621.0100 F: 206.749.2200 Prepared for: City of Auburn Project Title: Sanitary Sewer Comprehensive Plan Project No.: 145308 Technical Memorandum Subject: Sanitary Sewer Model Development Date: March 9, 2015 To: Robert Elwell, P.E. From: H. Justin Twenter, P.E. Prepared by: Brent Robinson, E.I.T. Reviewed by: M. Steven Merrill, P.E. Sanitary Sewer Model Development ii DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table of Contents List of Figures ........................................................................................................................................................... iii List of Tables ............................................................................................................................................................. iv List of Abbreviations ................................................................................................................................................. iv Section 1: Introduction ............................................................................................................................................. 1 Section 2: Modeling Scenarios ................................................................................................................................ 1 Section 3: Flow Monitoring Data ............................................................................................................................. 1 Section 4: Climatic Data ........................................................................................................................................... 3 4.1 Rainfall....................................................................................................................................................... 3 4.2 Evapotranspiration.................................................................................................................................... 4 Section 5: Hydraulic Model Development ............................................................................................................... 4 5.1 Software Platform ..................................................................................................................................... 4 5.2 Model Extent ............................................................................................................................................. 5 5.3 Infrastructure Data ................................................................................................................................... 7 5.3.1 Geographic Information System ................................................................................................. 7 5.3.2 Pump Station ............................................................................................................................... 8 5.3.3 Stuck River Trunk ...................................................................................................................... 11 5.4 Boundary Conditions .............................................................................................................................. 12 Section 6: Hydrologic Model Development ........................................................................................................... 12 6.1 Calibration Period Dry Weather Flow ..................................................................................................... 12 6.2 Development of Subcatchments ........................................................................................................... 15 6.3 Calibration Period Wet Weather Flow .................................................................................................... 17 Section 7: Long-Term Simulations......................................................................................................................... 20 Section 8: Future Conditions ................................................................................................................................. 22 8.1 Future Dry Weather Flow ........................................................................................................................ 22 8.1.1 Dry Weather Flow from Population Expansion ........................................................................ 22 8.1.2 Dry Weather Flow from Sewer Extension ................................................................................. 25 8.2 Future Wet Weather Flow ....................................................................................................................... 27 8.3 Future Hydraulic Improvements............................................................................................................. 28 8.4 Future-Conditions Summary ................................................................................................................... 31 Section 9: Model Results ....................................................................................................................................... 31 9.1 Baseline Conditions ................................................................................................................................ 31 9.2 2020 Conditions ..................................................................................................................................... 34 9.3 2034 Conditions ..................................................................................................................................... 36 Section 10: Conclusions ........................................................................................................................................ 39 References .............................................................................................................................................................. 40 Sanitary Sewer Model Development iii DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Attachment A: Modifications to Collection System GIS ....................................................................................... A-1 Attachment B: Pump Station Data ....................................................................................................................... B-1 List of Figures Figure 3-1. Auburn area flow monitors.................................................................................................................... 2 Figure 5-1. Auburn MIKE URBAN model extent ...................................................................................................... 6 Figure 5-2. Example pipe profile with interpolated manhole invert elevation ...................................................... 8 Figure 5-3. Ellingson PS comparison..................................................................................................................... 10 Figure 5-4. Location and flow path of SRT ............................................................................................................ 11 Figure 6-1. AUBRN53 monitor flow data and observed rainfall .......................................................................... 13 Figure 6-2. AUBRN53 monitor DWF calculation ................................................................................................... 14 Figure 6-3. Dry weather flow schematic ................................................................................................................ 15 Figure 6-4. Upstream area of influence example ................................................................................................. 16 Figure 6-5. MIKE URBAN RDI engine schematic .................................................................................................. 18 Figure 6-6. AUBRN53 wet weather calibration ..................................................................................................... 20 Figure 7-1. Citywide peak RDII Cunnane plot ....................................................................................................... 21 Figure 8-1. TAZ polygons within the vicinity of Auburn ......................................................................................... 23 Figure 8-2. Proposed sewer extensions and development percentages ............................................................ 26 Figure 8-3. High and low volume time series comparison example.................................................................... 28 Figure 8-4. Pacific PS re-route ............................................................................................................................... 30 Figure 9-1. Baseline-conditions minimum freeboard ........................................................................................... 32 Figure 9-2. Low-freeboard short manhole ............................................................................................................ 33 Figure 9-3. Flooding along Boundary Boulevard SW ............................................................................................ 33 Figure 9-4. 2020 conditions minimum freeboard ................................................................................................ 35 Figure 9-5. 2020 surcharge of the KC-owned Auburn West Interceptor ............................................................ 36 Figure 9-6. 2034 conditions minimum freeboard ................................................................................................ 37 Figure 9-7. Surcharged line upstream of Verdana PS .......................................................................................... 38 Figure 9-8. Hydraulic profile of KC-owned Auburn West Interceptor at Perimeter Road ................................... 38 Sanitary Sewer Model Development iv DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx List of Tables Table 3-1. King County Flow Monitors..................................................................................................................... 3 Table 4-1. Long Term Rainfall Sources and Dates ................................................................................................. 4 Table 5-1. Auburn Area Pump Station Capacities .................................................................................................. 9 Table 5-2. Auburn Area Pump Station Upgrades .................................................................................................. 10 Table 6-1. MIKE URBAN Hydrologic Model Calibration Parameters .................................................................... 18 Table 7-1. Peak RDII Cunnane Estimated Flow Frequency ................................................................................ 21 Table 7-2. Peak RDII per Monitoring Basin ........................................................................................................... 22 Table 8-1. Future Population Estimates by TAZ Polygon ...................................................................................... 24 Table 8-2. Analysis Period Model Modifications ................................................................................................... 31 List of Abbreviations BC Brown and Caldwell CIP capital improvement project City City of Auburn DHI Danish Hydraulic Institute DWF dry weather flow ET evapotranspiration ft3 cubic foot/feet GIS Geographic Information System gpcd gallons per capita per day HGL hydraulic grade line H&H hydrologic and hydraulic ID identification KC King County LOS level of service mgd million gallon(s) per day MH manhole PS pump station RDII rainfall-derived inflow and infiltration SR State Route SRT Stuck River Trunk SSA sewer service area TAZ Traffic Analysis Zone WWHM Western Washington Hydrology Model Sanitary Sewer Model Development 1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Section 1: Introduction As part of the 6-year comprehensive planning effort, Brown and Caldwell (BC) developed a hydrologic and hydraulic (H&H) model of the City of Auburn’s (City) sewer collection system. The objective of the modeling effort was to characterize the magnitude and volume of rainfall-derived inflow and infiltration (RDII) entering the sewer during wet weather events and to evaluate whether that RDII causes surcharge beyond the established level of service (LOS) and/or surface flooding during a 20-year storm in baseline (year 2014) conditions as well as future 6-year (year 2020) and 20-year (year 2034) conditions. This document de- scribes the analysis periods covered in this effort, driving data used to build the model, calibration of the model, and hydraulic results from the 20-year storm simulations. In general, the City’s sewer conveyance infrastructure performs well in a 20-year storm. The modeling analysis indicated that no capital improvement projects (CIPs) are required to address hydraulic capacity restrictions in City-owned pipes in the existing or future 6-year conditions. The future 20-year condition indicates an area of hydraulic restriction upstream of the Verdana Pump Station (PS); however, CIPs are not planned from 20-year condition simulation results. Section 2: Modeling Scenarios Four scenarios were analyzed for this modeling effort. For each case, the model was modified to represent H&H conditions at a particular point in time. Each of the modeling scenarios are described below: • Calibration period: Flow data used to calibrate the model were collected between September 2009 and May 2011. In order to calibrate the model’s hydrology appropriately, the modeled collection system flow paths needed to be representative of that time period. Trunk line and pump station upgrades made be- tween the calibration period and current conditions were left out of the model for model calibration. • Baseline conditions: The major change in flow paths between the calibration period and baseline 2014 conditions came from the construction of the Stuck River Trunk (SRT) and four pump station modifica- tions. The SRT diverts flow east from the intersection of K Street SE and 17th Street SE to the Auburn West Interceptor along C Street SW (see additional description in Section 5.3.3. Before 2014, two pump stations were decommissioned, a pump station was constructed, and a fourth pump station was up- graded. All of these changes were reflected in the model to represent baseline conditions. • 6-year planning horizon: Wastewater planners plan 6 years out, so, based on 2014 data, population growth and RDII increases in the system are projected for 2020. Plans to re-route the discharges from King County’s (KC’s) Pacific PS are also included in this simulation because it is expected to be re-routed in the near future. • 20-year planning horizon: Wastewater planners also plan 20 years out, so, based on 2014 data, population growth and RDII increases in the system are projected for 2034. Section 3: Flow Monitoring Data The KC Flow Monitoring program deploys between 80 and 120 flow monitors throughout the KC conveyance system to measure sanitary sewer flows for system management and capital facilities planning. Fourteen of those monitors measure flows from KC mainlines that service areas within the city of Auburn. The data from those monitors are used in this study to characterize dry weather flow (DWF) patterns and to perform model calibration. The flow monitoring locations are described in Table 3-1. Figure 3-1 presents a map of the city of Auburn with the flow monitors located and their tributary upstream basins delineated. These basins are called “monitoring basins.” Sanitary Sewer Model Development 2 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 3-1. Auburn area flow monitors Sanitary Sewer Model Development 3 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 3-1 provides a location description for each of the flow monitors used in this study and the date ranges of the monitors’ available data. In general, each flow monitor provided two wet seasons of data. Table 3-1. King County Flow Monitors Monitor ID Location Date range ABN008 20th St. NW at West Valley Hwy. 7/29/2009–5/23/2011 ABN022 37th St. NW east of 1st St. NW 7/30/2009–5/23/2011 ABN023 30th St. NW west of C St. NE 9/1/2009–5/17/2011 ABN027 29th St. NW at Interurban Trail 8/10/2009–5/22/2011 ABN032 Between Clay St. NW and H St. NW south of 6th St. NW 7/28/2009–5/16/2011 AUBRN53 44th St. NW east of I St. NW 9/1/2009–5/16/2011 AUBWV016 Boundary Blvd. SW at O Street SW 9/1/2009–5/18/2011 LAKELANDHILLS_WW Lakeland Hills PS northwest of Oravetz Rd. SE 3/4/2010–7/25/2011 LKH001A 37th St. NW west of 1st St. NW 9/17/2009–5/16/2011 MSTTR02A 23rd Street NE at E Street NE 8/6/2009–5/23/2011 MSTTR22A Henry Rd. NE north of 6th St. NE 8/3/2009–5/16/2011 MSTTR48 K St. SE north of 17th St. SE 9/1/2009–5/18/2011 WINT003 B St. NW north of 16th St. NW 9/1/2009–5/18/2011 WINT038 Interurban Trail north of 15th St. SW 9/28/2009–5/23/2011 The extent of each of the monitoring basins also defines the extent to which portions of the model were calibrated. Because the model’s hydrologic parameter sets are defined by monitoring basin, the boundaries in Figure 3-1 also define the extent of each of the calibration models. In other words, the portions of the model defined by the monitoring basin boundaries were calibrated independently of each other as calibra- tion basins. This is described in further detail in Section 6.3. Section 4: Climatic Data Rainfall and evapotranspiration (ET) time series data are required to simulate RDII processes within the hydrologic model. The following sections describe the development of these data for use in hydrologic model calibration and long-term model simulations. 4.1 Rainfall BC developed a rainfall time series with 15-minute time increments based on data from several rain gauges. Rainfall measurements recorded at the City’s rain gauge located at Auburn City Hall were used for the model calibration period (August 2009 through May 2011) because the City Hall gauge is located closest in proxim- ity to the flow monitoring basins. For the times when the City Hall gauge was uninstalled or malfunctioning, the data gaps were filled with rainfall collected at the Lakeland Hills PS, which is operated by KC and made available for free at the King County Hydrologic Information Center (King County, 2014). A comparison of rainfall totals for the Auburn City Hall gauge and the Lakeland Hills gauge over the period January 1, 2010, through April 30, 2011 (where Sanitary Sewer Model Development 4 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx data exist for both gauges) indicated that the Lakeland Hills gauge recorded 8.6 percent more rainfall than the City Hall gauge, which is considered acceptable for our industry. Local rainfall data were appended with 61 years of rainfall from Sea-Tac International Airport to create a long-term rainfall record that can be used to analyze wet weather frequency. The Sea-Tac data were extract- ed from the Western Washington Hydrology Model (WWHM 2014). Data priority in the record was given to the nearest gauges, with gauges farther outside of Auburn used only when necessary to complete the long- term record. Table 4-1 lists the rainfall data sources, date ranges used to compile the long-term record, and notes associated with the use of the data. Table 4-1. Long Term Rainfall Sources and Dates Gauge location Data source Start date End date Notes Sea-Tac Airport WWHM 2014 10/1/1948 12/31/2009 15-minute rainfall, used only in long-term simulations Auburn City Hall City of Auburn 1/1/2010 12/31/2010 15-minute local rainfall Auburn City Hall City of Auburn 1/1/2011 5/1/2011 5-minute rainfall aggregated to 15-minute time step Lakeland Hills PS King County Hydrologic Information Center 5/2/2011 5/31/2011 15-minute rainfall to fill the gap in the Auburn record with KC rainfall data Auburn City Hall City of Auburn 6/1/2011 11/13/2012 15-minute local rainfall Lakeland Hills PS King County Hydrologic Information Center 11/14/2012 12/5/2012 15-minute rainfall to fill the gap in the Auburn record with KC rainfall data 4.2 Evapotranspiration ET data are required to estimate evaporation and transpiration losses from the land surface. The Washing- ton State University Puyallup, Washington, extension operates the AgWeatherNet website, which is a reposi- tory for numerous climatological data sets throughout Washington State, including grass reference ET calculated for Puyallup. Grass reference ET from AgWeatherNet was acquired for the same time period as the long-term rainfall record (WSU, 2014). Given that the cities of Puyallup and Auburn are situated at roughly the same elevation in the eastern Puget Sound region, their daily ET values are likely similar; there- fore, the Puyallup Reference ET data set was considered applicable to the city of Auburn. Section 5: Hydraulic Model Development The following sections describe the software platform chosen for this modeling effort, the hydraulic model extent, as well as the infrastructure data used to create the model. 5.1 Software Platform Auburn’s sanitary sewer collection system discharges to KC mainlines at various locations throughout the city. KC has performed some coarse sanitary sewer modeling in the Auburn area using MIKE URBAN1 software, which is the County’s preferred modeling platform. Therefore, the City has chosen to use MIKE 1 MIKE URBAN is a software package developed and sold by the Danish Hydraulic Institute (DHI). More information can be found at http://www.mikepoweredbydhi.com/products/mike-urban. Sanitary Sewer Model Development 5 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx URBAN to be consistent with the County’s modeling approach. The latest version of MIKE URBAN (version 2014) was used. KC uses the MIKE URBAN Runoff Model A for surface flows and the RDI model for groundwater infiltration to estimate RDII. KC also uses the MOUSE hydraulic engine within MIKE URBAN to solve the hydraulic flow routing equations. The MOUSE engine uses the full Saint Venant equations to solve for water levels and velocities in piped systems. The Saint Venant equations provide more accurate hydraulic solutions in complicated hydraulic environments that include changing flow rates, pipe surcharging, and back water effects than simpler calculations such as the Kinematic Wave, which cannot solve flow rates in backwater conditions. For consistency with KC, Runoff Model A and the RDI model were used in conjunction with the MOUSE hydraulic engine in this modeling effort. 5.2 Model Extent The hydraulic extent of the MIKE URBAN model was chosen to be consistent with previous comprehensive planning modeling efforts. The same pipes, manholes (MHs), and pump stations included in the 2008 Comprehensive Plan (Brown and Caldwell, 2009) model were included in the current model. System modifi- cations since then (new pump stations, conduits, and force mains) were reflected in the current model as well. In general, all pipes 10 inches in diameter and larger within the sanitary sewer service area (SSA) were included in the model; smaller pipes were included only where needed to connect larger pipes to the main network and force mains. Pipes smaller than 10 inches in diameter are less likely to be under capacity because they are located predominantly in neighborhoods at the headwaters of the collection system and they convey small flows to the mainline system. Ignoring these pipes greatly improves model run times because of the reduced number of pipes requiring hydraulic calculations. Figure 5-1 provides a map of Auburn’s collection system, the pipes included in the MIKE URBAN model, and the boundary of the SSA. Sanitary Sewer Model Development 6 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 5-1. Auburn MIKE URBAN model extent Sanitary Sewer Model Development 7 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx 5.3 Infrastructure Data Three sources of data were used to develop inputs for the collection and conveyance system: (1) the City’s sewer utility geodatabase, (2) requested data from the City, and (3) the previous Comprehensive Plan model. The following sections describe the data hierarchy and assumptions made in hydraulic model development. 5.3.1 Geographic Information System The City’s Geographic Information System (GIS) Department provided BC with a 2014 sewer utility geodata- base titled “Sewer.gdb.” The geodatabase contains geospatial locations and attribute data for sanitary sewer structures such as mainlines, manholes, pump stations, and other appurtenances. The geodatabase was used as the primary data source for constructing the collection and conveyance system model. Pipe attributes such as diameter, inlet and outlet elevations, and length, as well as manhole attributes of invert and rim elevation, are all necessary to build out the hydraulic network. Some gaps existed in the geodatabase that required an assumption to fill. The following describes the hierarchy of assumptions used to assign missing data: • Manholes: − Invert elevation: If missing or suspect, the inlet invert elevation from the outgoing pipe was used if available as it should be the lowest connecting element to the manhole. Otherwise, invert elevation of the same node in the 2008 Comprehensive Plan model was used. If the data are not available from those two sources, straight-line interpolation between the upstream and downstream manhole invert elevations was used. − Rim elevation: If missing or suspect, rim elevation of the same node in the 2008 Comprehensive Plan model was used if available. Otherwise, the rim elevation was estimated from land surface ele- vation contour data. − Manhole ID: Identification (ID) numbers were assigned to exist for all manholes. If an ID was miss- ing, the 2008 Comprehensive Plan model ID was used. • Conduits: − Inlet and outlet elevations: If missing or suspect, the invert elevation from the connecting manhole was used. Otherwise, the 2008 Comprehensive Plan model value was used. If both of those were unavailable, straight-line interpolation between the nearest known upstream and downstream ele- vations was used. − Diameter: If missing or suspect, the 2008 Comprehensive Plan model value was used. Otherwise, it was estimated based on the diameters of the adjacent pipes. − Conduit ID: Identification numbers were verified for all conduits. If an ID was missing, the 2008 Comprehensive Plan model ID was used Once the gaps in the data fields were filled, the database was imported to the MIKE URBAN model such that hydraulic profiles could be plotted to inspect for erroneous data through visual inspection. Hydraulic profiles plots were drawn for the entire modeled collection system and used to find incorrect diameters or invert elevations by checking for severe and/or adverse slopes. Adjustments were made to correct elevations using data from the 2008 Comprehensive Plan model where available. Otherwise, straight-line interpolation was used for elevation data replacement (see example in Figure 3-1). No diameters appeared to require adjust- ment in this process. In total, 110 manhole invert elevations were adjusted to remove GIS elevation errors from the hydraulic model. These adjustments are documented in Attachment A. Sanitary Sewer Model Development 8 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 5-2 below shows a profile of a pipe section requiring elevation adjustment. The manhole in the middle likely has an incorrect invert listed in the GIS as a small gravity pipe in a neighborhood is unlikely to be so dramatically inclined. Consequently, the manhole was assigned a new invert by interpolating between the two manholes on either side. The connecting conduits were adjusted to have no inlet or outlet offset from the adjusted manhole. Figure 5-2 provides the adjusted profile. This adjustment reduces the risk of simulat- ing system backups that are likely based on faulty GIS data. Figure 5-2. Example pipe profile with interpolated manhole invert elevation 5.3.2 Pump Station BC asked the City for updated wetwell volume and pump capacity information for the pump stations within the study area. On March 14, 2014, the City provided an Excel table summary of the requested pump station information, which is included in Attachment B. Each pump station is composed of a lead pump and a lag pump. The single pump capacity was given for each, but a total combined pump capacity was not given for when both pumps are running. To account for the reduction in capacity due to higher downstream head conditions from both pumps running, but without empirical data to inform a reduction factor on the second pump’s capacity, a general assumption of 50 percent of single pump capacity was assumed for the lag pump. Table 5-1 below provides the pump station capacity information used in the hydraulic model. Likely incorrect MH invert elevation Corrected invert elevation Sanitary Sewer Model Development 9 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 5-1. Auburn Area Pump Station Capacities Pump station Location Number of pumps Single pump capacity (mgd) Multiple pump capacity (mgd) 22nd Street 22nd St. SE & Riverview Dr. 2 0.792 1.188 8th Street J St. NE & 8th St. NE 2 0.216 0.324 Area 19 Lake Tapps Pkwy. E & west of 72nd St. SE 2 0.468 0.702 D Street D St. NE & Auburn Way N. 2 0.576 0.864 Dogwood Dogwood St. SE 1500 & 15th St. SE 2 0.432 0.648 Ellingson Road 41st St. SE, east of A St. SE 2 2.199 3.298 F Street F St. SE & 17th St. SE 2 0.576 0.864 Lakeland Hills Oravetz Rd. SE north of Mill Pond Dr. SE 1* 1.732 N/A North Tapps Lake Tapps Pkwy. E & west of 176th Ave. E. 2 0.734 1.102 Peasley Ridge S. 320th St. & 53rd Ave. S. 2 0.396 0.594 R Street R St. NE & 6th St. NE 2 0.144 0.216 Rainer Ridge 125th Pl. SE & south of SE 318th Way 2 0.288 0.432 Riverside 8th St. NE & 104th Ave. SE 2 0.576 0.864 Terrace View E Valley Hwy. E & north of Terrace View Dr. SE 2 0.972 1.458 Valley Meadows 4th St. SE & V St. SE 2 0.180 0.270 Verdana 118th Ave. SE & SE 296th Pl. 3** 2.520 3.780 * Lakeland Hills PS pump data not provided by the City as it is KC-owned. Single pump and parameters used from 2008 Comprehensive Plan model as no new data were available. **Third Verdana pump is an emergency pump and is not included in the hydraulic model. The City was unable to provide updated data about the Lakeland Hills PS because it is owned and operated by KC. Therefore, the 2008 Comprehensive Plan model values for the pump station were reused in this modeling effort. The data available then were limited to one pump at 1.732 million gallons per day (mgd) capacity, although the pump station has two discharge force mains and multiple pumps. Only one force main is included in the model as only one pump capacity is known. Since the previous Comprehensive Plan update, three pump stations were upgraded, a new pump station was built, and two pump stations were decommissioned. The Dogwood and Ellingson PSs were upgraded and are included in the model. The Auburn 40 PS, although upgraded, is not explicitly modeled. Rather, its flow contribution and signature is accounted for within the model’s hydrologic calibration. Because the hydraulic network is not extended up to the pump station, flow peaks are created within the hydrologic model rather than using a pump station to augment the flow signature. The Verdana PS was constructed to lift water that used to flow to the Valley Meadows and White Mountain PSs, both of which were decommis- sioned. Table 5-2 below provides a summary of the modeled pump station upgrades since the previous Comprehensive Plan. Following the table are discussions of how these changes were accounted for within the model. Sanitary Sewer Model Development 10 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 5-2. Auburn Area Pump Station Upgrades Pump station Monitoring basin Previous capacity (mgd) New capacity (mgd) Previous wetwell volume (ft3) New wetwell volume (ft3) Dogwood MSTTR48 0.58 0.65 930 925 Ellingson WINT038 2.9 3.30 500 1,086 Verdana MSTTR02A Valley Meadows = 0.36 3.78 Valley Meadows = 588 5,395 White Mountain = 0.36 White Mountain 333 Total = 0.72 Total = 921 The Dogwood PS was upgraded to a slightly higher pumping capacity after the monitoring period. The change in peak discharge attributable to the pump station was assessed by examining the modeled flow at the nearest downstream flow monitoring location (MSTTR48) given the two pump station capacities. Visual inspection of the flow hydrograph at the monitor location indicated that the change in pumping capacity made no appreciable difference in flow rates. Therefore, the new pump capacity was used during model calibration. The Ellingson PS, across the river from the Lakeland Hills PS, was also upgraded after the flow monitoring period. Therefore, the old pump station parameters were used for calibration and adjusted parameters were used to model baseline conditions. Both the Lakeland Hills and Ellingson PSs discharge to manhole 1208- 38 because they share a force main. The nearest flow monitor downstream is the WINT038 flow monitor, which accepts flow from both pump stations. Figure 5-3 presents a comparison of discharges from the Ellingson PS using previous and adjusted parameters. The use of a new constant-speed pump (orange) produces flow spikes unlike the discharges from the previous variable-speed pump (blue). However, down at the flow monitoring location, the pump station flows appear to attenuate and, consequently, the change in flows at the monitor location are negligible (red = new pump parameters, green = old pump parameters). The change in peak flow at the flow monitoring location for the December 2010 storm (largest storm in the monitoring period) is nearly 5 percent, suggesting that the changes at the Ellingson PS did not greatly affect the flow signature at the flow monitor. Figure 5-3. Ellingson PS comparison Orange: new constant-speed pump discharge; blue: old variable speed pump discharge; green: modeled flows at monitor with new pump; red: modeled flows at monitor with old pump Sanitary Sewer Model Development 11 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx The Verdana PS replaced the Valley Meadows and White Mountain PSs for conveying wastewater from the northeast portion of the city to the KC interceptor lines. The new Verdana PS has more capacity and wetwell volume than the two older pump stations combined. Gravity pipe infrastructure in the area was modified to bring wastewater flows to the Verdana PS; these modifications are reflected in the hydraulic model. Because the subcatchment areas are a function of the pipe lengths within the system, a reworking of the model’s hydrology would have been required to run the model in the different pumping conditions. Verdana PS is far enough upstream from the next downstream flow monitor (MSTTR02A) that much of its flow signature can attenuate before being observed. Furthermore, the Verdana PS’s discharges are a small proportion of the total flow at the monitor because the MSTTR02A monitor also observes the MSTTR22A and MSTTR48 monitoring basins upstream. Consequently, reworking the model to run the decommissioned Valley Mead- ows and White Mountain PSs for the sake of calibration was not pursued as the hydraulic modifications do not make enough of a change in the flow signature at the monitor to warrant model reconstruction. 5.3.3 Stuck River Trunk The SRT is approximately 4,000 feet long, with a diameter of 27 inches. Its purpose is to route flows from a capacity-limited sewer line in southeast Auburn across to the Auburn West Interceptor, which has capacity to convey additional flows. The SRT was constructed in 2013, which was after the monitoring period. Therefore, the calibration conditions model did not include the SRT. The SRT was built into the hydraulic model for baseline and future conditions using design plan sets provided by KC. As-built drawings were not available; however, Robert Elwell (Elwell, 2014) indicated in an e-mail that constructed conditions did not deviate much from the original drawing set. Figure 5-4 below indicates the location of the SRT and the new flow path it provides. Figure 5-4. Location and flow path of SRT Sanitary Sewer Model Development 12 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx 5.4 Boundary Conditions Boundary conditions at model outfalls can affect the hydraulic performance of a collection system. For a collection system that discharges to a water body, such as a river, the elevation of the river’s water surface can cause backwater in the collection system if the river elevation is high. Knowledge of the boundary condition is necessary to accurately replicate this phenomenon. In the case of Auburn’s collection system, a normal depth downstream boundary condition was used, which assumes that the hydraulic grade line (HGL) in the most downstream link is set by the normal flow depth rather than a special hydraulic circumstance such as a regulated interceptor where the level is set by manual or automated controls (thus creating an HGL level that does not correlate with flow rate). In the case of the Auburn system, the outlet sewer line was modeled beyond the AUBRN53 flow monitor (the lowest flow monitor, representing the boundary of the calibrated study area) such that the hydraulic condition at the outlet of the modeled collection system would provide a reasonable HGL back up at the edge of the study area. Because the interceptor line within which the AUBRN53 flow monitor is located is not regulated with controls, normal flow calculations are adequate in ensuring that the HGL within the model is representative of field conditions. A normal depth boundary condition also provides a representative downstream hydraulic condition during long-term simulations where observed depths in the downstream system are not available. Section 6: Hydrologic Model Development This section describes the development of the hydrologic model, which produces the two components of sewer flow: • DWF, which is composed of wastewater from residential, commercial, and industrial water usage and is relatively unaffected by climatic conditions • RDII, which consists of groundwater (infiltration) seeps into sewer pipes through holes, cracks, joint failures, and faulty connections, as well as runoff (inflow) from roof drain downspouts, foundation drains, storm drain cross-connections, and through holes in manhole covers. Subcatchments are created in the model to generate RDII flows to the collection system. The land surface and subsurface parameters are then calibrated to produce simulated flows that reflect the conditions observed through flow monitoring. Model simulations provide long-term flow hydrographs that can be analyzed to quantify the magnitude and frequency of peak flow events for use in conveyance design. 6.1 Calibration Period Dry Weather Flow DWF can be measured during prolonged dry periods when wet weather flows are relatively small. In the Pacific Northwest, DWF is best measured in August and September after the aquifers recede and groundwa-ter baseflows are lowest. Furthermore, these months experience comparatively lower chances of rainfall, which further improves the likelihood that the observed flow is not influenced by wet weather. Flow monitoring data across all monitors generally included two dry periods, during the two observed summers, from which the DWF portion could be calculated. Figure 6-1 below provides the observed flow data for the AUBRN53 monitor, as an example, with observed rainfall plotted at the top. The red brackets indicate the dry periods that were selected to represent typical DWF patterns. In both of these periods, rainfall is minimal and the groundwater baseflow is assumed to be minimal as the hydrograph levels off from its wet season recession. The lack of a recession indicates that the groundwater infiltration has likely ceased and the only remaining component of the hydrograph is the flow attributable to DWF. Sanitary Sewer Model Development 13 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 6-1. AUBRN53 monitor flow data and observed rainfall Calculating DWF for implementation into the model involves assessing an average flow magnitude that can be scaled on an hourly basis to represent the daily use patterns observed in the flow data. Although an average amount of DWF is created within the system, it enters the system in peaks and troughs based on usage patterns that vary throughout the day. Hourly scaling factors multiply against the average flow magni- tude to represent those troughs and peaks within the model. For example, the average flow magnitude for the AUBWV016 monitoring basin is 1.15 mgd; however, the peak water usage on a weekday from 8 to 9 a.m. is 1.31 mgd. To account for that hour’s DWF, the model scales the 1.15 mgd average value by a factor of 1.14 to achieve 1.31 mgd within the model from 8 to 9 a.m. Average flow magnitudes and hourly factors for weekdays, Saturdays, and Sundays were calculated for each of the flow monitors within the area of study and built into MIKE URBAN’s “cyclic patterns” engine to simulate Auburn’s DWF. Flow monitors located downstream of other flow monitoring locations were used to quantify DWF for inter- mediate areas. For example, flow monitor MSTTR22A is located downstream from the MSTTR48 flow monitor. The DWF associated with the intermediate MSTTR22A monitoring basin is equal to the total DWF at the MSTTR22A monitor minus the DWF at the MSTTR48 monitor. Figure 6-2 below illustrates the DWF pattern calculated for weekday DWF at the AUBRN53 monitor. The observed flow data are presented in blue and the simulated DWF (given the calculated average DWF magnitude [7.168 mgd] and the daily and hourly factors) is presented in red. Dry periods for DWF calculation Sanitary Sewer Model Development 14 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 6-2. AUBRN53 monitor DWF calculation Blue = observed; red = modeled Figure 6-3 is a schematic of the flow monitors used to calculated DWF rates and patterns including calculat- ed estimates for the average total and average incremental DWF rates for each monitor. Note that the PACIFICPS_FM monitor was not used because it is located within a section of KC-owned pipe that is not included in the hydraulic model. DWF for the area upstream of the PACIFICPS_FM monitor was captured by the next monitor downstream: AUBWV016. Sanitary Sewer Model Development 15 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 6-3. Dry weather flow schematic DWF can be loaded into a MIKE URBAN model in a variety of ways. For this modeling effort, DWF was loaded as a geocoded network load using the “Load Allocation” tool. The benefit of using this methodology is that the loads for an entire monitoring basin can be lumped into one network load, which can easily be switched between active and inactive without having to change the properties of every node in the model. This makes for a cleaner and more organized model. DWF was loaded proportionally across all modeled nodes within each monitoring basin based on the upstream pipe length weighting calculations detailed in Section 6.2. For the ABN008 monitoring basin, the 0.15 mgd average DWF flow magnitude was proportionally divided across all 63 of the modeled nodes using the area factors described in Section 6.2. As a high-level check, the total DWF for the SSA was used to estimate per capita water usage. In 2010, the residential population of Auburn was 70,420. The total DWF generated within the City’s SSA was calculated as the average DWF at the AUBRN53 monitor minus the average DWF at AUBWV016 (monitoring inflows from KC-owned pipes). This calculates to 6.02 mgd of DWF, which equates to 86 gallons per capita per day (gpcd) of potable water usage. This value is consistent with Robert Elwell’s understanding of the City’s water consumption and indicates that the DWF values calculated for this modeling effort are reasonable. 6.2 Development of Subcatchments The City of Auburn’s collection system is a separated system, which means runoff from land surfaces should be routed into the stormwater conveyance system rather than into sewer pipes. However, monitoring data indicate that there is a wet weather flow signature in the sewers, indicating that either groundwater, surface water, or some combination of both is present. Loading the land surface into the model involves the creation of subcatchments, which are model represen- tations of the land surface that create wet weather flow. Each subcatchment has an assigned area (as well as other hydrologic parameters) and loads RDII to a collection system node. Every node in the hydraulic model was assigned a subcatchment representative of the contributing area upstream of each node. The exception to this rule are dummy nodes, which are fictitious nodes used to connect links in complex hydrau- lic configurations. To account for the upstream contributing area at a given node, upstream pipe length was multiplied by an assumed width. Upstream contributing area was calculated as the length of pipe between a Sanitary Sewer Model Development 16 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx given modeled node and the next upstream modeled node and/or the length of upstream pipes not included in the hydraulic model, multiplied by 200 feet of width (100 feet on each side of the conduit). For areas of the collection system that are not included in the hydraulic model (such as a neighborhood with all 8-inch- diameter pipes as depicted in Figure 6-4 below in red), this weighting system accounts for the proportionally higher amount of system inflows assumed to be from that area. Conversely, a node along a mainline may have a small area of influence that is simply representative of the length of one upstream link (the link in blue in Figure 6-4). In a given wet weather event, proportionally more flow is expected to be loaded to the mainline at MH 1409-29 than would be expected to enter the collection system at MH 1409-16. This weighted approach attempts to account for this field process. ArcGIS software was used to calculate up- stream pipe lengths. Those data were then brought over to Microsoft Excel, where subcatchment area calculations were made. During calibration, the total area of some monitoring basins was adjusted to match KC modeling efforts (described in Section 6.3). However, the area proportions defined by this method were retained. Figure 6-4. Upstream area of influence example In addition to assigning areas to model subcatchments, the subcatchment areas can be divided against the total area of a monitoring basin, for example, to create non-dimensional area factors for use in distributing other types of loads across the collection system on a monitoring basin basis. Subsequent sections below describe the use of the area weighting factors to distribute those flows. Sanitary Sewer Model Development 17 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx The development of the AUBWV016 basin’s hydrologic model deviated slightly from the monitoring basins wholly within the City’s SSA. The AUBWV016 monitor observes flow entering the SSA within a KC main line from KC’s collection system upstream. Although the KC pipes in this monitoring basin can be displayed within a map (see Figure 3-1), elevation data for the pipes are missing in KC’s GIS and these pipes were not included in the MIKE URBAN hydraulic model. A single model subcatchment instead represents the entire monitoring basin and its area calculation follows the methodology established above. The KC-owned Pacific PS within the monitoring basin is consequently not hydraulically modeled. Its flow signature is inherent to the hydrologic calibration of the subcatchment. 6.3 Calibration Period Wet Weather Flow Calibrating the RDII module of MIKE URBAN is a process of iteratively adjusting hydrologic modeling parame- ters to match observed flows from flow monitoring records for each of the calibration basins. This modeling effort used the MOUSE Time-Area model for surface water discharges in combination with the MOUSE RDI groundwater modeling routine to calculate RDII flow rates. This combination of hydrologic routines is con- sistent with the preferred methods used by KC. Calibration of the MIKE URBAN model was performed by moving sequentially from the upstream monitoring basins to the most downstream basins. BC contacted Bob Swarner at KC to inquire as to whether KC would be willing to share its parameters for this area to expedite our calibration. On March 28, 2014, Bob Swarner sent BC MOUSE models for each of the flow monitoring basins within the Auburn study area. These models provided a set of initial model parameters from which to begin calibration. In some cases, further calibration was not required as the KC parameters performed adequately within the calibration models. A goal of meeting wet weather peak magnitudes and volumes within 10 percent was the established calibration criterion for this modeling effort. The KC MOUSE models assumed different total subcatchment areas for each monitoring basin, so the BC subcatchment areas within each calibration model were scaled until the total area matched the area in the KC models. This preserved the proportional loading of RDII established by the upstream pipe length calcula- tions while maintaining the water balance generated by the KC MOUSE models. By maintaining the same water balance as KC, the calibration effort of the MIKE URBAN model was greatly reduced. The KC-parameterized MIKE URBAN calibration basin models were run through the calibration period (fall 2009 through spring 2011) to ensure that the KC parameters, once transposed to the new BC models, performed adequately against the flow monitor data. In most cases, small adjustments were made to the hydrologic model parameters (indicated in Table 6-1) to refine the calibration. Such adjustments are ex- pected because the KC MOUSE models were simplified models consisting of one large subcatchment and one conduit, while the BC models account for the full length of travel throughout the collection system. Adjustments were sometimes necessary to compensate for the peak flow attenuation effects of the collec- tion system. Adjustments were made to both the surface runoff and RDI engine parameters depending on the calibration needs of the model. The RDI engine accounts for the predominant portion of the collection system’s wet weather flow because Auburn’s collection systems are separated and directly connected inflow is minimal. Consequently, calibration was focused primarily on the RDI engine’s response. Figure 6-5 below provides a schematic of the RDI engine indicating the different storage zones and components of the flow hydrograph. Sanitary Sewer Model Development 18 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 6-5. MIKE URBAN RDI engine schematic Source: DHI MIKE URBAN User Manual Table 6-1 below provides the model parameters adjusted in both the surface and RDI engines and what effect they have on the hydrograph. Table 6-1. MIKE URBAN Hydrologic Model Calibration Parameters Engine Parameter name Description Effect on calibration Time Area A – Surface Runoff Imperviousness (%) Relative amount of impervious area; affects rapid inflow response peak and volume Time of concentration (min) Time for runoff to travel from the distal end of the subcatchment Rapid inflow response timing and shape Initial loss (in) Initial abstraction depth before rapid response can be discharged Rapid inflow peak timing Sanitary Sewer Model Development 19 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 6-1. MIKE URBAN Hydrologic Model Calibration Parameters Engine Parameter name Description Effect on calibration RDI – Groundwater Infiltration Groundwater area (%) Percent of subcatchment area available for groundwater storage and discharge to collection system Duration of groundwater response Surface storage (in) Storage layer that must be filled before a rapid response can be discharged and before infiltration to subsurface zones can begin Timing of rapid response peak and volume of subsurface response Root zone storage (in) The zone below the surface and above the groundwater storage layer that transitions moisture between the two layers Its depth affects the hydrologic responses of both the surface and groundwater zones Overland coefficient A fraction that determines the extent to which excess rainfall (after the surface storage is filled) runs off as overland flow vs. infiltrating to the lower zone. A value of 0 sends all rainfall excess to the lower zone. Affects volume of overland flow Groundwater coefficient The proportion of the groundwater catchment to the surface catchment. A value less than 1 makes the groundwater catchment smaller than the associated surface catchment. Affects volume of groundwater response Tc overland flow (hr) Time constant used to determine how fast the surface flow responds to rainfall and the total volume discharged. Affects overland flow peak timing Tc interflow (hr) Time constant used to determine how fast the interflow responds to rainfall and the total volume discharged. Affects interflow peak timing. Tc baseflow (hr) Time constant used to control hydrograph recession during dry periods. Affects shape of groundwater response Specific yield Determines the specific yield of the groundwater aquifer. Affects aquifer storage volume, and as a function, volume and shape of groundwater response Calibration focused on matching the seasonal rise and fall of wet-weather-induced baseflow as well as matching peak response due to individual storms. Over the course of two wet seasons, there were nine large storms against which to calibrate the model’s peak runoff response, with the December 12, 2010, storm providing the largest peak. Preference was given to calibrating to the largest storms in the record because the model’s primary use is to simulate large storms. Two rising baseflow limbs from the falls of 2009 and 2010 and the falling baseflow limb of 2010 provided a sufficient amount of data to calibrate the baseflow response. Figure 6-6 below shows the calibration plot at AUBRN53 for the December 12, 2010 storm. The AUBRN53 monitoring basin model is the farthest downstream monitoring basin, so its performance reflects the per- formance of the entire model upstream as those monitoring basin models flow into this model. The AUBRN53 model nearly matches the observed peak of 19 mgd by simulating only 2.4 percent lower. The recession out of the storm nearly matches and the DWF patterns visually appear to be well represented in the model. This model slightly overestimates flows in the days leading up to the peak on December 12; however, the error on the total volume is 6.6 percent, which is well below the 10 percent maximum error goal for this modeling effort. Sanitary Sewer Model Development 20 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 6-6. AUBRN53 wet weather calibration Blue = observed; red = modeled Section 7: Long-Term Simulations BC ran hydrologic model simulations to calculate long-term flow hydrographs that can be used to analyze the magnitude and frequency of historical wet weather events. The long-term rainfall record (described in Section 4.1) provides enough data for the model to be run from January 1, 1949, through December 31, 2012 (64 years), including 3 months of “spin up” time to remove the influence of initial-conditions parame- ter estimates. Identification of the 20-year storm is necessary as the stated LOS goal for the sewer system is 20 years (see Chapter 3 of the 2014 Comprehensive Plan). Running the model through a 20-year storm will indicate areas of the system that back up or flood, which can help to identify areas that do not meet the stated LOS. Each of the calibration basin models were run using the 64-year record and the results were summed to create a citywide RDII time series, which does not include DWF. The summed time series represents the total RDII entering the collection system at any moment in the 64-year period. The citywide time series was then separated into discrete events using a 24-hour inter-event duration to isolate periods when the RDII peaked above a threshold minimum flow value of 8 mgd. This means that only the events that produced more than 8 mgd of peak RDII were included, and smaller events were removed from the analysis. The selected events were ordered from largest to smallest and assigned a rank. A rank of 1 was assigned to the largest storm, 2 to the second-largest, and so on. Cunnane plotting parameters were used to estimate the recurrence interval for each event in years, as follows (Maidment, 1992): 𝑇𝑅= 𝑖+0.2𝑅𝑅𝑅𝑅−0.4 Where: 𝑖=𝑅𝑛𝑛𝑛𝑛𝑛 𝑜𝑜 𝑠𝑖𝑛𝑛𝑠𝑅𝑠𝑖𝑜𝑅 𝑦𝑛𝑅𝑛𝑠 𝑅𝑅𝑅𝑅=𝑛𝑅𝑅𝑅 𝑜𝑜 𝑠𝑠𝑜𝑛𝑛 𝑤ℎ𝑛𝑛𝑛 1 𝑖𝑠 𝑠ℎ𝑛 𝑠𝑅𝑛𝑙𝑛𝑠𝑠 𝑠𝑠𝑜𝑛𝑛 Sanitary Sewer Model Development 21 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx The above equation will not identify a historical storm event that has exactly a 20-year peak flow recurrence. For a 64-year record, the third-largest event is estimated to have about a 25-year recurrence and the fourth- largest event is estimated to have about an 18-year recurrence using Cunnane parameters. The third- and fourth-largest events from the 64-year simulated record produced peak discharges within ±0.2 mgd of each other; therefore, either event could be used to approximate a 20-year event recurrence. The larger of the two events, occurring on February 5, 1996, was selected as the 20-year design event to be used to evaluate collection system capacity and identify deficiencies in the conveyance system that may affect the systems LOS. Figure 7-1 and Table 7-1 below provide the peak RDII inflow frequency for specific recurrence intervals based on log-interpolation between plotted events. These flows represent the peak RDII entering the collec- tion system throughout the entire SSA. The aggregated RDII inflows neither account for system storage, nor do they include DWF. The aggregated RDII inflow time series does provide a clear distinction between storms in their hydrologic response as collection system factors such as hydraulic capacity, flooding, and travel time are not able to distort the peak flow signature of wet weather events. Figure 7-1. Citywide peak RDII Cunnane plot Peak RDII frequency values were calculated for each calibration basin to examine the relative contributions from each basin. Dividing the peak RDII by the total length of the upstream collection system to calculate unit RDII values provides insight into how leaky the pipes are. Table 7-2 provides the peak 20-year RDII statistics for each monitoring basin. Peak RDII for monitoring basins downstream of upland basins does not account for the inflows from the upstream basins. In other words, the RDII values are specific to the RDII created solely within the monitoring basin regardless of the influence of upstream basins. Monitoring basins ABN022 and ABN023 illustrate the importance of calculating unit RDII values. Although ABN022 has a higher 20-year peak RDII than ABN023, the unit RDII per mile of pipe for ABN023 is higher. This indicates that the pipes within the ABN023 monitoring basin may be in worse physical condition than those in the ABN022 basin, as ABN023 pipes create more RDII per length of pipe. 0 5 10 15 20 25 30 35 0.1 1.0 10.0 100.0 1000.0 Pe a k R D I I ( m g d ) Recurrence Interval (years) Table 7-1. Peak RDII Cunnane Estimated Flow Frequency Flow Threshold RDII (mgd) Q100 32.77 Q50 30.25 Q25 27.19 Q20 27.03 Q10 24.69 Q5 21.76 Q2 18.75 Q1 15.36 Sanitary Sewer Model Development 22 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 7-2. Peak RDII per Monitoring Basin Monitoring basin 20-year RDII (mgd) RDII/in.-diam-mile* (mgd/in.-mi) RDII/mi** (mgd/mi) ABN008 0.44 0.006 0.051 ABN022 1.10 0.010 0.106 ABN023 0.47 0.015 0.171 ABN024 0.11 0.004 0.040 ABN027 0.58 0.003 0.045 ABN032 1.95 0.038 0.367 ABRN53 5.43 0.031 0.969 AUBWV016 6.90 0.030 0.263 LakelandHills 0.23 0.001 0.006 LKH001A 0.66 0.051 0.582 MSTTR02A 3.23 0.006 0.054 MSTTR22A 5.31 0.019 0.195 MSTTR48A 3.76 0.011 0.125 WINT003 0.77 0.008 0.202 WINT038 1.05 0.008 0.088 * RDII per inch-diameter mile is a calculation of peak RDII divided by the sum of the upstream pipe diameters multiplied by their respective total length of pipe in miles. This accounts for the fact that larger-diameter pipes can provide more pathways for infiltration to enter the collection system. ** RDII per mile is a calculation of the peak RDI divided by the total length of upstream pipe in miles without regard for the size of those upstream pipes. Section 8: Future Conditions The calibrated model was modified to estimate future flows given anticipated population growth, develop- ment, and hydraulic modifications within the SSA. In Auburn, it is anticipated that population growth will contribute additional DWF to the system alongside additional RDII from extension of the sewer system to previously unsewered and undeveloped areas. Modified modeling simulations were used to identify potential capacity restrictions that will need to be eventually addressed with capital improvements. The following sections describe how the baseline model was modified to represent the future conditions of the 6-year (2020) and 20-year (2034) planning horizons. 8.1 Future Dry Weather Flow Future increases in DWF are expected to come from two sources: population growth (both new development and redevelopment) and extending the sewer to areas that are currently using septic systems to treat their wastewater. The following two sections describe the source data and parameterization of these sources of DWF for both the 6-year and 20-year planning horizons. 8.1.1 Dry Weather Flow from Population Expansion The state of Washington is divided into Traffic Analysis Zone (TAZ) polygons to track current populations and to estimate future populations on a small-area basis. These TAZ polygons are used predominantly to plan Sanitary Sewer Model Development 23 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx transportation improvements to accommodate increasing populations. The population estimates for each TAZ can be used to estimate the anticipated populations within the SSA and, consequently, the increase in DWF from those residents. Table 8-1 maps the TAZ polygons used in this modeling effort against the bound- ary of the proposed SSA (see the Sewer Comprehensive Plan for more information about the proposed SSA). Note that the TAZ polygons do not line up directly with the boundary of the proposed SSA. Figure 8-1. TAZ polygons within the vicinity of Auburn To account for the differing boundaries between the TAZ polygons and the proposed SSA, an assumption of population distribution uniformity within the TAZ was made in order to perform an area-weighted approach to population growth estimation based on the fractional area of the TAZs within the proposed SSA (the excep- tion is TAZ 748, which is described below). For example, approximately 10.4 percent of TAZ 448 is located within the proposed SSA. Therefore, only 10.5 percent of the future population projection would be applied to the estimated increase in DWF to the collection system. The area factor for TAZ 448 then becomes 10.5 percent. Two exceptions to this method were applied in this effort. The first exception deals with TAZ polygons 432, 444, 445, and 763, which are fully outside of the proposed SSA but whose residents discharge to KC’s collection system in the southwest corner of the proposed SSA. These polygons use a 100 percent area Sanitary Sewer Model Development 24 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx factor and are assumed to fully discharge to KC’s pipes. The second exception accounts for the non- uniformity of the existing population distribution in TAZ 748 in the north Lake Tapps area. Visual inspection of the TAZ indicated that the population density was non-uniform across the proposed SSA boundary, so the TAZ’s area factor was increased from 31.4 percent to 62.8 percent, which allowed the 2013 population estimate within the city boundary using the factored TAZ polygons to equal the 2013 population estimate from the City provided by Elizabeth Chamberlain at the City of Auburn (Chamberlain, 2014). This step provides assurance that the TAZ polygon area factors method matches the City’s own understanding of its population numbers in the baseline scenario. The TAZ calculations were used to estimate population increases both in the proposed SSA and on KC land (portion that use sewer lines that run through the city) for the 2020 and 2034 planning horizons using linear interpolation. The TAZ-based City of Auburn population estimates calculated by BC were within 1 percent of the estimates provided by the City for the two planning horizons, indicating that the TAZ calculations were corroborating the work the City had already performed within the city’s boundary. Table 8-1 below provides the population estimates and area factors for each TAZ polygon. Red text indicates TAZ polygons outside of the proposed SSA but whose populations use KC sewer lines that run through the City. Table 8-1. Future Population Estimates by TAZ Polygon TAZ ID Area factor 2010 population 2013 population 2020 population 2034 population 404 10.2% 811 823 852 937 405 100% 4,678 4,871 5,320 6,240 406 10.2% 516 532 569 640 409 22.1% 2,068 2,122 2,247 2,542 411 100% 4,428 4,718 5,395 6,505 430 8.6% 678 712 790 912 432 100% 3,905 4,138 4,681 5,583 433 100% 1,576 2,589 4,952 7,348 434 100% 136 142 156 181 435 100% 83 86 94 111 436 100% 4,177 4,265 4,469 5,106 437 100% 4,479 4,499 4,546 5,068 438 83.2% 4,330 4,525 4,981 5,869 439 100% 2,376 2,386 2,410 2,686 440 100% 0 0 0 0 441 100% 12 12 12 13 442 100% 9,186 9,248 9,392 10,481 443 100% 1,296 1,307 1,332 1,494 444 100% 4,317 4,348 4,419 4,764 445 100% 4,905 4,889 4,851 5,028 446 100% 3,344 3,511 3,902 4,626 447 79.9% 6,299 6,355 6,484 7,275 448 10.4% 217 223 237 262 Sanitary Sewer Model Development 25 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Table 8-1. Future Population Estimates by TAZ Polygon TAZ ID Area factor 2010 population 2013 population 2020 population 2034 population 449 1.1% 46 46 47 49 450 100% 7,544 7,930 8,829 10,481 451 71.9% 2,872 2,954 3,144 3,627 748 62.8%* 9,267 9,379 9,641 10,351 763 100% 349 365 402 463 Service area population** 83,896 86,974 94,155 108,642 TAZ calculated city population 70,420 73,235 79,802 92,804 City estimate N/A 73,235 80,532 N/A Percent difference N/A 0.0% -0.9% N/A * Area fraction for TAZ 748 (north Lake Tapps) increased to make the TAZ calculated city population match the City’s estimate for 2013. ** Service area refers to the area inside which all collected sewage routes through the city (including inside KC mainlines). Red text indicates TAZ polygons outside of the proposed SSA with populations whose sewage is conveyed through the city in KC’s mainlines. An assumption of 80 gpcd was used to assign future DWF to the model for the additional future populations. By comparison, the calculated average DWF for the city in 2013 is 86 gpcd (which includes industrial and commercial inputs as well). Anecdotal information from the City indicates that future DWF estimates are near 60 gpcd. Given that future development is likely to include higher-efficiency water features that reduce per capita water demands, a planning-level value of 80 gpcd is considered conservative. Industrial and commercial inputs were assumed to scale proportionally with population growth. Future DWF from population growth was applied to the model in addition to existing DWF for both the 2020 and 2034 planning horizons. Application of the future DWF was performed using MIKE URBAN’s water load boundary condition editor, which allows a specified flow magnitude to be loaded at any node and scaled or manipulated by a factor or pattern. Water loads representing future DWF magnitudes were applied to the model’s nodes within each TAZ with load distribution based on the upstream pipe length factors described in Section 6.2. For example, TAZ 405 is estimated to experience population growth of 642 people within the proposed SSA by 2020, which equates to 0.051 mgd of future DWF. That 0.051 mgd of DWF was then distributed proportionally across the nodes within TAZ 405 based on the area factors from the upstream pipe length calculations (described in Section 6.2). 8.1.2 Dry Weather Flow from Sewer Extension The City plans to extend the sewer system into residential areas that currently use onsite septic systems. These areas will contribute DWF to the collection system in addition to the DWF increases from population growth described above. Accounting for the amount and source of the DWF from the sewer extension involved planning the locations of the future sewers and estimating the chance they will be developed by each of the planning horizons. BC identified areas where the sewer system was likely to be expanded to serve both developed and undeveloped areas. Those locations were geocoded as proposed sewer lines within ArcGIS. The City’s Planning Services department provided a “percent chance of development” for these sewer lines based on the 2020 and 2034 planning horizons (Table 8-2). Sanitary Sewer Model Development 26 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 8-2. Proposed sewer extensions and development percentages Legend: (2020 Percentage, 2034 Percentage) Sanitary Sewer Model Development 27 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Sewer lines were classified as serving either new development or existing development. Sewer lines serving existing development were used to make an estimated calculation of the future DWF expected from the connection of those residences based on geocoded pipe length. To estimate the magnitude of the DWF, the existing DWF from eight headwater-monitoring basins was divided against the total length of pipe in those basins to get a value of 0.52 mgd of DWF per 100,000 feet of pipe. This value provides an estimate of the amount of DWF produced per length of pipe, which can estimate DWF from sewer line extension to devel- oped areas. Applying the percent chance of development to the estimated flow magnitude for the lines to the existing development adjusts that future DWF down to a value representative of the chance that the DWF will ever exist. Flows were loaded into the model at the nearest node located downstream of the future line. A citywide average diurnal pattern was used to scale the DWF throughout the day. 8.2 Future Wet Weather Flow The construction of new sewer lines will create additional pathways for RDII to enter the collection system because of inevitable holes, cracks, joint failures, and faulty connections. Accounting for that future RDII in the model is important to make a more reasonable estimate of the future HGL when additional RDII enters the collection system from sewer extension. Figure 8-2 (Section 8.1.2) indicates the locations of the planned sewer extensions, as well as the percent chance that they will be constructed by the 2020 and 2034 planning horizons. All of these planned lines, whether for new development or to connect existing develop- ment, are subject to RDII; thus, the development type distinction is irrelevant in the calculation of future wet weather flow. It is assumed that existing lines will have approximately the same amount of structural defects in the future, so their RDII loading is unchanged for future conditions. BC used KC’s planning-level peak RDII value of 1,500 gallons per acre per day (Earth Tech Team, 2005) to estimate RDII into the new sewer lines for a 20-year storm. Calculating a contributing area to the proposed sewer lines was performed by multiplying the sewer length by 200 feet of influence width (described in Section 6.2). To account for the chance that the pipe segment will be in the ground by the planning horizon, the percent chance of development factor was multiplied against the contributing area to scale it down. Equation 8-1 below describes the flow calculation for RDII from sewer extension. Equation 8-1. Flow from sewer extension RDII 𝑄𝑖𝑖𝑖𝑖𝑖𝑖−𝑚𝑚𝑚=(1500 𝑙𝑔𝑅𝑑)∗(𝑔𝑖𝑔𝑛 𝑠𝑛𝑅𝑙𝑠ℎ 𝑜𝑠)∗(200 𝑜𝑠 𝑤𝑖𝑑𝑠ℎ)∗(𝑃𝑠𝑅𝑅𝑅𝑖𝑅𝑙 𝐻𝑜𝑛𝑖𝐻𝑜𝑅 𝐷𝑛𝐷𝑛𝑠𝑜𝑔𝑛𝑛𝑅𝑠 𝑃𝑛𝑛𝑃𝑛𝑅𝑠𝑅𝑙𝑛)∗(1 𝑜𝑠243,560 𝑅𝑃𝑛𝑛 )∗(1 𝑀𝑀1,000,000 𝑀𝑅𝑠) The future wet weather RDII was loaded into the model using a scaled unit RDII time series and an applied factor. The RDII time series of the ABN032 basin was selected because the hydrograph provides a large volume of water to the system because of its elongated rising and recession limbs. A high-volume time series will produce a conservative result when evaluating storage and conveyance. The ABN032 time series was scaled to a peak value of 1 mgd such that a factor within the model could be used to multiply the time series to the appropriate value for each loading node given in Equation 8-1 above. For example, if the required flow at a node from a sewer line extension is 0.05 mgd peak, a factor of 0.05 is applied to the RDII time series to produce 0.05 mgd of peak flow to the model. This method provides a representative hydrograph shape to use within the model as compared to using a constant RDII value at each node, which would provide an overly conservative HGL. Sanitary Sewer Model Development 28 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 8-3 shows the difference between high and low volume time series. The two time series experience identical peak flow rates; however, the purple time series puts significantly more water into the collection system and is more likely to indicate capacity deficiencies in the system than the red time series. Figure 8-3. High and low volume time series comparison example Red = low-volume storm; purple = high-volume storm For areas of redevelopment where housing will become denser, an assumption that denser developments will most likely use the existing sewer lateral rather than install new laterals prevents the need to load future RDII from those areas. Consequently, RDII from new development was the only type of future RDII included in the model. 8.3 Future Hydraulic Improvements After the flow monitoring period between 2009 and 2011, KC embarked on a two-phase project to reduce flooding risks in capacity-limited sections of its sanitary sewer lines. For Phase I, KC constructed the SRT in 2013, which routes wastewater flow from the MSTTR48 monitoring basin (diversion at the intersection of K Street SE and 17th Street SE) to the Auburn West Interceptor, thereby alleviating capacity deficiencies in the diversion area. This was included in the baseline-conditions model. Phase II of the project will route flow from the Pacific PS to the Auburn West Interceptor, thereby reducing surcharging near the intersection of Boundary Boulevard SW and O Street SW. This project needed to be included in the future-conditions scenarios as it is planned but not yet designed or constructed. At of the time of modeling, design drawings were not available for the Pacific PS project. A conceptual layout of the project indicated that a new force main would be constructed to discharge to an interceptor line that runs parallel to the Auburn West Interceptor before the two lines join at MH 807-46. Information such as the pump station’s capacity, operational changes, force main diameter, etc., was not available; therefore, assumptions were made to fill in these gaps. Sanitary Sewer Model Development 29 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx In the calibration-conditions model, the Pacific PS was not modeled, nor was KC’s upstream collection system. The area tributary to the Pacific PS is a part of the AUBWV016 monitoring basin. Because the pump station belongs to KC, it was not explicitly included in the baseline-conditions hydraulic model but, rather, its inflow hydrograph was captured in the calibration of the AUBWV016 hydrologic model. As described in Section 6.2, the AUBWV016 hydrologic model was modeled with one subcatchment to load KC flows into the City’s collection system without a full collection system model. Although GIS data exist that describe the layout of the County’s pipes tributary to the AUBWV016 flow monitor, elevation data are lacking such that the collection system could not be built without additional data. Therefore, the AUBWV016 model subcatch- ment (representing the hydrology of the monitoring basin) was subdivided to isolate the area contributing to the Pacific PS. KC GIS data were used to calculate the total length of pipe upstream of the AUBWV016 flow monitor, including the areas upstream of the Pacific PS. The ratio of the length of pipe upstream of the Pacific PS to the total length of pipe within the AUBWV016 monitoring basin was used to divide the AUBWV016 sub- catchment into two subcatchments. Figure 8-4 below shows the pipes located within the AUBWV016 moni- toring subcatchment and the proposed force main layout and discharge location. The green pipes upstream of the Pacific PS account for 59 percent of the total pipe length within the monitoring basin. Consequently, the AUBWV016 subcatchment in the hydrologic model was split and 59 percent of the area was re-routed to MH 807-46. Sanitary Sewer Model Development 30 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 8-4. Pacific PS re-route Existing Pacific PS discharge location Sanitary Sewer Model Development 31 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx 8.4 Future-Conditions Summary Preparing the MIKE URBAN model to simulate future conditions required adjustments to both the hydrologic inputs and the hydraulic network. DWF and RDII must be increased to account for population growth and future development. Hydraulic modifications to the collection system must reflect planned infrastructure projects. Table 8-2 summarizes the three results-producing periods of analysis and the major changes associated with them. Table 8-2. Analysis Period Model Modifications Scenario Dry weather flow Wet weather flow Hydraulic modifications Baseline None None Stuck River Trunk (constructed 2013) 2020 (6-year planning horizon) Population expansion = +0.82 mgd Sewer extension = 0.36 mgd Sewer extension = + 0.56 mgd Pacific PS new discharge location* 2034 (20-year planning horizon) Population expansion = + 1.98 mgd Sewer extension = +0.78 mgd Sewer extension = + 1.23 mgd None* *Analysis period includes hydraulic modifications from previous periods. Section 9: Model Results The following sections describe the results of the hydraulic capacity evaluations. A 20-year event was simulated to identify locations where the sewer collection system does not have sufficient capacity to meet the LOS standard. The City’s LOS standard for new sewers is defined as no surcharging of pipes during the 20-year storm (where surcharging is defined as the HGL rising above the pipe crown). For existing sewers, the standard is relaxed to allow surcharging below an excessive level, although the magnitude of excess is not defined. The maps in the subsequent sections identify the minimum freeboard calculated at each modeled manhole. Minimum freeboard at a manhole is calculated as the depth from the maximum simulat- ed HGL elevation to the surface elevation. Manholes with maximum HGL elevations that exceed the rim elevation are considered to be in flooding condition. Assessment of minimum freeboard gives indication of hydraulic restrictions as the system is forced to back up and surcharge when water cannot pass through restricted sections. For the purposes of this analysis, manholes with 3 feet of minimum freeboard or less are indicated as they are surcharged high enough to cause or nearly cause flooding because of hydraulic restrictions. Capacity evaluations were run with all manholes set as “sealed.” Sealing the manholes prevents water losses due to flooded manholes and forces sewer flows to continue downstream. This retains flows for evaluation of downstream pipe capacities so that the entire collection system can be evaluated for peak flow capacity. 9.1 Baseline Conditions Results from the baseline-conditions simulation indicate one area that floods (along Boundary Boulevard SW west of O Street SW) and 20 additional locations with less than 3 feet of freeboard. Investigation of the 20 locations with less than 3 feet of freeboard indicates that all of the manholes are shallow with depths between 2.5 and 3.5 feet, which means that even DWF alone will result in 3 feet of freeboard or less. These minimum freeboard locations are therefore not to be interpreted as indicative of a hydraulic restriction that causes surcharging induced by high amounts of RDII. Figure 9-1 presents the minimum freeboard at all manholes within the model in the baseline condition. Sanitary Sewer Model Development 32 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-1. Baseline-conditions minimum freeboard Boundary Blvd SW flooding area Sanitary Sewer Model Development 33 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-2 shows MH 409-33 (one of the 20 identified manholes outside of the Boundary Boulevard area with less than 3 feet of minimum freeboard), which has a calculated freeboard of 2.14 feet. The MH depth is 2.41 feet, which means the depth of flow is only 0.27 foot. Because only 27 percent of the pipe depth (1- foot diameter pipe) is being used at the peak of the 20-year storm, the calculated minimum freeboard in this MH is not indicative of a hydraulic restriction. This situation is similar at the 19 other shallow manhole low freeboard locations throughout the city. (Note: MIKE URBAN’s results viewer displays in metric units.) Figure 9-2. Low-freeboard short manhole Figure 9-3 below shows the simulated HGL along Boundary Boulevard SW between State Route (SR) 167 and O Street SW and indicates that MH 906-26 and MH 906-12 would flood during the 20-year event. There is only 2,400 feet of Auburn sewer upstream of this location (to the left of MH 906-14 in the figure), so the flooding is induced primarily by RDII from the 139,000 feet of KC line upstream of the AUBWV016 flow monitor (which discharges into MH 906-06 in the figure) rather than RDII from the Auburn line itself. Flows from upstream of the AUBWV016 monitoring basin include the existing discharges from the Pacific PS. Figure 9-3. Flooding along Boundary Boulevard SW MH Depth = 2.41 ft. Flooding predicted Sanitary Sewer Model Development 34 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx The baseline-conditions model run indicates that there is area with flooding and it is due to high flows from KC. Twenty other locations have calculated minimum freeboard levels of less than 3 feet; however, this calculation is due to short manhole depths. These 20 locations were inspected and hydraulic results of the model did not indicate that there were instances of hydraulic restriction during the 20-year storm. These 20 locations can therefore be ignored as they do not represent a risk to LOS. 9.2 2020 Conditions Results from the 2020 simulation indicate that re-routing flow from the Pacific PS to the Auburn West Interceptor reduced the HGL along Boundary Boulevard SW such that no manholes show a minimum freeboard of less than 3 feet. However, the additional flows in the KC-owned Auburn West Interceptor raise the HGL enough to cause the minimum freeboard to fall below 3 feet in eight manholes between 15th Street SW and 15th Street NW. Figure 9-4 provides the minimum freeboard map for the 2020 simulation. Sanitary Sewer Model Development 35 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-4. 2020 conditions minimum freeboard Auburn West Interceptor surcharged line Sanitary Sewer Model Development 36 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-5 shows the surcharged segment of the Auburn West Interceptor from MH 907-01 to MH 607-20, which includes the eight manholes with freeboard less than 3 feet (1 meter in the figure). This line is owned by KC and is therefore not considered for CIP by the City. Figure 9-5. 2020 surcharge of the KC-owned Auburn West Interceptor 9.3 2034 Conditions Results from the 2034 simulation are considered to be more uncertain than the results of the baseline and 2020 scenarios. This is because accurately predicting the pace and location of development and population expansion 20 years into the future is inherently difficult. Consequently, the following results should be interpreted as indications of what could happen given best estimates, rather than predictions of what will necessarily happen. The model results indicated that the area around the intersection of Perimeter Road SW and 1st Street SW is likely to experience flooding due to increased flows within the Auburn West Interceptor. Additionally, future sewerage of the existing development upstream of the Verdana PS is likely to produce surcharge in the line along 118th Avenue SE. Figure 9-6 presents the results of the minimum freeboard evaluation for the 2034 planning horizon. Sanitary Sewer Model Development 37 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-6. 2034 conditions minimum freeboard Perimeter Rd. flooding area 118th Ave SE. high HGL Sanitary Sewer Model Development 38 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Figure 9-7 shows the maximum HGL along 118th Avenue SE to the Verdana PS wetwell. MH 313-115 has a minimum of 0.5 foot of freeboard at the peak of the event. This area, although already developed, is planned to be sewered to bring the existing development onto the City’s collection system. The model indicates that when this area is sewered, the shallow sloped section of 8-inch-diameter pipe upstream of the Verdana PS is likely to surcharge to within 0.5 foot of the lowest manhole rim elevation, indicating a high risk of flooding at that location given the uncertainty associated with this planning horizon. Because the HGL falls off sharply in conjunction with a steepening of the pipes on the downstream end, the high HGL is attributable to a lack of conveyance capacity of the pipeline rather than backup from the pump station wetwell. This suggests that, although the Verdana PS has been sized and built to handle increased flows associated with future sewer- age, the existing sewer lines may not have enough capacity to convey that sewage to the pump station in 2034. Figure 9-7. Surcharged line upstream of Verdana PS Figure 9-8 presents the hydraulic profile of the Perimeter Road flooding area along the Auburn West Inter- ceptor. The added flows from the SRT, the diversion of Pacific PS, as well as the increased flows from population growth and new sewer lines all increase the HGL in this line, resulting in flooding at two locations. Although this flooding violates the City’s LOS, the line is owned by KC and is therefore not considered for CIP development by the City. Figure 9-8. Hydraulic profile of KC-owned Auburn West Interceptor at Perimeter Road 0.5 ft freeboard Verdana P.S. wetwell flooding predicted Sanitary Sewer Model Development 39 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Section 10: Conclusions BC used MIKE URBAN to construct and calibrate a model of the City’s sewer collection system including outlying areas that drain into the city. The model was used to evaluate conveyance capacity deficiencies for existing baseline conditions, as well as the future 6-year and 20-year conditions corresponding with the planning horizons of the Comprehensive Plan. The model was calibrated using 2 years of flow data from 14 KC flow monitoring sites that were within the Auburn vicinity. Calibrating over this long period of time helps to reduce model calibration uncertainty as a variety of storm sizes and durations are used to adjust the model parameters. BC modeled future H&H conditions for the 6-year and 20-year planning horizons using population growth and sewer extension estimates, which add dry and wet weather flow to the collection system by adding new users and new pipe. Hydraulic features constructed after the flow monitoring period, such as new pump stations and a trunk line, were included in the model to accurately represent baseline conditions. A future modification to King County’s Pacific PS, although still in conceptual design, was modeled in both future conditions to estimate the effect of that modification on hydraulic conveyance. BC analyzed long-term hydrographs to identify an event in the 64-year rainfall record that is closest to a 20- year event. The 20-year event, which took place on February 5, 1996, was simulated in the existing- conditions, future 6-year, and future 20-year conditions models to evaluate the LOS of the collection system in all three conditions. Although LOS is defined stringently for new construction as no surcharging of the pipe crown during a 20-year storm, surcharge below an excessive amount is allowed for the existing system before LOS is considered to be violated. Modeling results analysis identified manholes with less than 3 feet of minimum freeboard during the 20-year storm as an indicator of pipe sections with hydraulic restriction that cause surcharge of the system. In general, the City of Auburn’s sanitary collection system has no capacity-related issues. Although the baseline-conditions modeling indicates flooding along Boundary Boulevard, this issue will be alleviated by the re-routing of discharge from KC’s Pacific PS in the coming years. The 6-year planning horizon simulation, which accounts for the Pacific PS’s proposed new discharge location, indicates that the Auburn West Interceptor will experience surcharge as the HGL will rise to within 3 feet of minimum freeboard because of increased discharge from the pump station. The interceptor is owned by KC and is not considered for CIP. The 20-year planning horizon simulation indicates that flooding is likely to occur along the Auburn West Interceptor and surcharge is likely upstream of the Verdana PS. The sewer lines upstream of the Verdana PS are owned by the City; however, CIP is not planned around results from this scenario because of the uncer- tainty associated with the assumptions for 20 years into the future. Sanitary Sewer Model Development 40 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx References Brown and Caldwell, December 2009. City of Auburn Comprehensive Sewer Plan. Prepared for the City of Auburn by Brown and Caldwell. Chamberlain, Elizabeth “RE: TAZ data.” April 18, 2014. E-mail. City of Auburn, Wash. Earth Tech Team, Regional Needs Assessment Report, Regional Infiltration and Inflow Control Program, Appendix A5 Assump- tions for Regional I/I Control Program, King County, 2005 (pg. 7) Elwell, Robert. “County Plans.” June 12, 2014. E-mail. Sewer Utility Engineer, City of Auburn, Wash. King County,”Hydrologic Data Download Page,” Hydrologic Information Center Home, 2014, http://green.kingcounty.gov/wlr/waterres/hydrology/ Maidment, David R., ed. Handbook of Hydrology. New York, N.Y.: McGraw-Hill, 1992. Print. Washington State University Puyallup Extension, “Historic Data,” AgWeatherNet, 2014, http://weather.wsu.edu/awn.php Sanitary Sewer Model Development A-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Attachment A: Modifications to Collection System GIS MH IDIssue 807-28Elevation likely too low, appears to look like a syphon. Rim elevation much lower than nearby contour 908-19Invert likely too high. Profile jumps up for this MH. Interpolate the elevation for a smooth profile 808-80, 708-12 Elevation likely too low, appears to look like a syphon. Interpolate the elevation for a smooth profile. MH elevations in area do not match 2008 Comp Plan model 508-28 Elevation likely too low, appears to look like a syphon. MH not in 2008 comp plan model. Interpolated to a new elevation for consistent profile. 1009-91 Elevation too low, appears to look like a syphon. Use invert from 909-56 in 2008 comp plan (same location, name appears to have changed). 1012-69Elevation was low for outlet node of a forcemain. Use 2008 comp plan model for elevations 1009-95Elevation likely too high. Interpolate to constant slope to match rest of trunk. Node not in 2008 comp plan 1009-44Elevation likely too high. Use 2008 comp plan model value to prevent adverse slopes 1009-101Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value. 909-52Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value. 909-102Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value. 809-91Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value. 709-40Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value. 709-80 Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value for invert. Rim elevation was below pipe crown, so interpolate to rim elevation. 709-28Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 810-20Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 710-25Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value 710-34Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 710-32Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 610-48Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value 610-123, 610-125, 310-124 Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 610-12, 610-117 Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value 610-09Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value 611-56Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 511-54Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 510-76Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 511-26, 511-27 Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value 511-41, 511-39, 411-68, 410-77, 410-76 Elevations adjusted to 2008 Comp Plan to remove adverse slopes 509-19, 509-18 Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value. Set 509-19 Rim to same as the next MH downstream in the intersection as the comp plan value is illogically high (almost 30 feet higher than same intersection MH) 509-07Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value. 908-19Elevation likely too high. Creates adverse slope on inlet pipe. Interpolate the invert as MH does not exist in 2008 comp plan. 708-29Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 808-80Elevation likely too low. Creates adverse slope on outlet pipe. Interpolate a value as MH not in 2008 Comp Plan 1009-100Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value. 1010-91Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 811-13Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 508-28Elevation likely too low. Creates adverse slope on outlet pipe. Interpolate a value as MH not in 2008 Comp Plan 614-90Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 714-05Elevation likely too low. Creates adverse slope on outlet pipe. Interpolate value as MH not in 2008 comp plan 713-18Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan model value. 413-66Elevation likely too high. Creates adverse slope on inlet pipe. Invert interpolated as MH is not in 2008 comp plan. 512-91Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 611-07Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan value. 709-28Rim elevation much higher than nearby contours. Interpolated value used. 409-40Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 410-78Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 410-01Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan value. 410-25Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 409-55Invert likely too high. Creates adverse slope on outlet pipe. Interpolate an invert as MH not in 2008 comp plan model. 606-86MH Depth 1.2', not likely. Rim elevation interpolated 506-07Invert too high. Creates adverse slope on inlet pipe. Use 2008 comp plan value. 906-14, 906-26, 1006-02, 1006-04 Inverts too low, use comp plan values. Otherwise, water would not leave the pipes to travel downstream (steep adverse slope after 1006-04) 906-05Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 807-28Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 307-07Elevation likely too high. Creates adverse slope on inlet pipe. Use 2008 comp plan value. 409-72, 309-11, 309-10 Elevations incorrect. Use 2008 Comp Plan values 409-01Elevation too low, creates adverse slope outlet pipe. Use 2008 Comp Plan value 309-75, 309-74 Elevations too low, creates adverse sloped mainline. Use 2008 comp plan values 309-68Elevation too low. Use 2008 comp plan value 309-76, 309-49, 309-48, 309-47, 309-46, 309-68 Elevations need adjustment to 2008 comp plan values as pipeline is adverse 207-11, 207-05 Elevations need adjustment down as pipeline is adverse. Use 2008 comp plan values 713-22Invert too high, interpolate a lower value as 2008 comp plan value is integer. 713-14, 713-13 Elevations too high, create adverse slopes. Use 2008 comp plan values 709-84, 709-87, 709-68, 709-67, 709-63 Adjust all values to 2008 Comp Plan values as this section is adverse 710-72, 710-73, 710-74 Adjust all values to 2008 Comp Plan values as this section is adverse 608-32, 508-13 Adjust all values to 2008 Comp Plan values as this section is adverse 509-12Elevation too high, creates adverse slope. Interpolate value as comp plan value is a copy of upstream value. 409-51Elevation too low, creates adverse slope. Interpolate value. 512-10Elevation likely too low. Creates adverse slope on outlet pipe. Use 2008 comp plan model value 407-01Value likely too high, interpolated down so mainline is constant slope. 307-18Value likely too high, interpolated down so mainline is constant slope. 1208-38, 1108-09, 1108-07, 1108-08, 1008-09, 908-24, 908-25, 908-26 Interpolated MH inverts based on 0.002 ft/ft slope upstream of known elevation at 908-15. Rim elevations estimated from contours Sanitary Sewer Model Development B-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the beginning of this document. AuburnSewer_ModelTM_Draft.docx Attachment B: Pump Station Data In v e r t Ele v a t i o n ( f t ) Ri m E l e v a t i o n (f t ) De p t h (f t ) Un i t A r e a (f t 3/f t ) Vo l u m e ( f t 3 ) Di a m e t e r , a s s u m i n g ci r c u l a r ( f t ) St a r t L e v e l ( f t ) S t o p L e v e l ( f t ) S t a r t L e v e l ( f t ) S t o p L e v e l ( f t ) 16 1 0 A r e a 1 9 2 5 2 2 . 2 1 5 4 0 . 8 1 1 8 . 6 2 8 . 2 7 5 2 5 . 8 2 2 6 5 2 9 . 2 5 2 7 . 5 5 3 0 . 2 5 2 7 . 5 3 2 5 15 0 9 T e r r a c e V i e w 2 5 8 . 5 7 7 . 6 19 . 1 28 . 2 7 53 9 . 9 5 7 6 64.663.865.663.8675 13 0 9 E l l i n g s o n R o a d 2 72 . 3 93 . 9 21 . 6 50 . 2 7 10 8 5 . 8 3 2 8 77.575.879.075.81527 10 0 9 F S t r e e t 2 80 . 2 1 0 3 . 3 2 3 . 1 28 . 2 7 65 3 . 0 3 7 6 86.785.387.785.3400 61 1 R i v e r s i d e 2 41 . 9 6 7 1 . 2 1 2 9 . 2 5 28 . 2 6 82 6 . 6 0 5 6 48.447.049.447.0400 71 0 R S t r e e t 2 53 . 9 8 71 17 . 0 2 28 . 2 6 48 0 . 9 8 5 2 6 60.259.261.259.2100 70 5 P e a s l e y R i d g e 2 45 4 . 5 5 4 7 4 . 2 5 1 9 . 7 28 . 2 6 55 6 . 7 2 2 6 460.5458.6461.5458.6275 61 4 R a i n e r R i d g e 2 38 5 . 2 5 4 0 5 1 9 . 7 5 28 . 2 6 55 8 . 1 3 5 6 391.2389.1392.2389.1200 81 1 V a l l e y M e a d o w s 2 46 . 9 8 7 2 . 5 2 5 . 5 2 28 . 2 6 72 1 . 1 9 5 2 6 51.550.552.550.5125 51 1 2 2 n d S t r e e t 2 41 57 . 4 3 1 6 . 4 3 28 . 7 47 1 . 5 4 1 6 47.145.848.145.8550 20 9 D S t r e e t 2 33 . 5 50 16 . 5 28 . 2 7 46 6 . 4 5 5 6 39384038400 71 0 8 t h S t r e e t 2 60 . 2 5 7 8 . 2 5 18 28 . 2 7 50 8 . 8 6 6 64.163.0565.0563.05150 13 0 9 L a k e l a n d 2 0 0 0 40 0 0 NA 00000 15 1 1 N o r t h T a p p s 2 50 5 5 3 7 . 4 5 3 2 . 4 5 28 . 2 6 91 7 . 0 3 7 6 512510.6513510.6510 12 0 8 S a f e w a y 2 0 0 0 0 0 0 00000 41 3 V e r d a n a 3 36 3 . 1 7 3 9 4 3 0 . 8 3 17 5 53 9 5 . 2 5 15 371.37369.37372.37369.371750 21 0 A u b u r n 4 0 2 23 57 . 4 34 . 4 63 . 6 21 8 7 . 8 4 9 28.526.529.526.5440 91 2 D o g w o o d 2 25 5 2 7 3 . 4 1 8 . 4 50 . 2 6 92 4 . 7 8 4 8 260259260.8259300Single Pump Capacity (gpm) Nu m b e r o f P u m p s St r u c t u r e I D P u m p S t a t i o n N a m e Lag Pump We t W e l l Lead Pump City of Auburn Comprehensive Sewer Plan C-1 DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. City of Auburn Comprehensive Sewer Plan_DRAFT V2.docx Appendix C: Pump Station Information Pacific PUMP STATION Dogwood PUMP STATION Verdana PUMP STATION SafewayPUMP STATION Area 19 PUMP STATION R Street PUMP STATION F StreetPUMP STATION Auburn 40 PUMP STATION Riverside PUMP STATION8th StreetPUMP STATION North Tapps PUMP STATION 22nd Street PUMP STATION Auburn Jail PUMP STATION Terrace View PUMP STATION Rainier Ridge PUMP STATIONPeasley Ridge PUMP STATION Lakeland Hills PUMP STATION Valley MeadowsPUMP STATION Ellingson Road PUMP STATION Issac Evans Park PUMP STATION Auburn Golf CoursePUMP STATION Auburn Justice CenterPUMP STATION Auburn Valley Humane Society PUMP STATION A S T S E B S T N W A U B U R N W A Y S M S T S E C S T S W SR 1 6 7 - S O U T H SR 1 6 7 - N O R T H I S T N E AU B U R N W A Y N R S T S E SR 18-EASTSR 18-WEST 12 4 T H A V E S E 13 2 N D A V E S E WE S T V A L L E Y H W Y N E MAIN ST SE 304TH ST S 277TH ST C S T N W C S T N E STUCK RIVER DR SE 15TH ST SW 2ND ST E W MAIN ST 15TH ST NW LAKE TAPPS PKWY SE 53RD ST SE 41ST ST SE 51 S T A V E S 29TH ST SE SE 312TH ST K E R S E Y W A Y S E M S T N W SE 320TH ST M S T N E SE 288TH ST 37TH ST SE 8TH ST NE 37TH ST NW SE 284TH ST 22ND ST NE L A K E L A N D H I L L S W A Y S E ORA V E T Z R D S E 17TH ST SE S 296TH ST 25TH ST SE 12TH ST SE PER I M E T E R R D S W 55 T H A V E S R S T N E AC A D E M Y D R S E 11 0 T H A V E S E D S T S E D S T N W 10 4 T H A V E S E A S T N E PA C I F I C A V E S 4TH ST SE I S T N W 11 6 T H A V E S E A S T N W 11 8 T H A V E S E WE S T V A L L E Y H W Y S LEA HILL R D S E SE 299TH ST GRE E N R I V E R R D S E EM E R A L D D O W N S D R N W D S T N E N S T N E W S T N W E S T N E 37TH ST NE O S T N E 56 T H A V E S 69TH S T S E S 316TH ST S C E N I C D R S E S 287TH ST H S T N W 44TH ST NW 62ND ST SE S 300TH PL SR 1 6 7 - S O U T H R A M P 14TH ST NE CL A Y S T N W SE 316TH ST AUBURN-BLACK DIAMOND RD SE SR 1 6 7 - N O R T H R A M P SR 18-EAST RAMP 11 2 T H A V E S E RIVERWALK DR SE 14 4 T H A V E S E EVERGREEN WAY SE EA S T V A L L E Y H W Y E 4TH ST NE 4 6 T H P L S MO N T E V I S T A D R S E K S T S E 4TH ST SW H A R V E Y R D N E BR I D G E T A V E S E 7TH ST SE S 331ST S T 5TH ST SE I S T S E EA S T B L V D ( B O E I N G ) DO G W O O D S T S E FR O N T A G E R D 67TH ST SE L S T S E PI K E S T N E 8TH ST SE T S T S E F S T S E MIL L P O N D D R S E 14 0 T H A V E S E C S T S E FO S T E R A V E S E H S T S E 52 N D A V E S G S T S E 1 0 5 T H P L S E 32ND ST NE B S T S E SE 316TH PL E S T S E SE 310TH ST 15TH ST NE G P L S E 47TH ST SE 56TH ST SE RIVE R D R S E SE 296TH WAY 54 T H A V E S A S T S W S 305TH ST 57T H P L S SE 290TH ST U S T N W PEASLEY CANYON RD S QU I N C Y A V E S E 12 7 T H P L S E 13 0 T H A V E S E 28TH ST NE 35TH WAY SE BOUNDARY BLVD SW 30TH ST NE EL I Z A B E T H A V E S E R S T N W OL I V E A V E S E 65 T H A V E S 51ST ST N E RI V E R V I E W D R N E 26TH ST SE SE 323RD PL S 300TH ST O S T S W B S T N E H O W A R D R D S E SE 301ST ST 29TH ST NW SE 287TH ST 32ND ST S E 36TH ST SE 10TH ST NE 64TH ST SE 50T H S T S E 10 8 T H A V E S E 3RD ST SE V S T N W 21ST ST N E A ST E HE M L O C K S T S E 31ST ST SE 2ND ST NW FORES T R I D G E D R S E 85 T H A V E S 30TH ST SE S 318TH ST SE 298TH PL 24TH ST SE 23RD ST SE 22ND ST SE H S T N E 64 T H A V E S PI K E S T N W SR 18 - W E S T R A M P 42ND ST NW G S T N E 58 T H A V E S 16TH ST NE 17TH ST NE S 288TH ST 11 1 T H P L S E 24TH ST NE SE 282ND ST LU N D R D S W 19TH DR NE 12 6 T H A V E S E 49TH ST NE 1 0 2 N D A V E S E TE R R A C E D R N W ELLINGSON RD SW SKYWAY L N S E HI C R E S T D R N W O S T S E 10TH ST SE D S T S W 17 6 T H A V E E SE 3 2 6 T H P L SE 295TH ST 20TH ST SE SE 286TH ST V S T S E 66TH ST SE 14 8 T H A V E S E F S T S W V C T S E 24TH ST NW 12 8 T H P L S E 72ND ST SE 16TH ST SE S 312TH ST 6TH ST NW 42ND ST NE 13TH ST SE B PL NW 3RD ST NW SE 3 1 2 T H W A Y 2ND ST SE SE 294TH ST Z S T S E 73RD ST SE 55 T H P L S S 292ND ST EL M S T S E ELM LN SE PE A R L A V E S E 10 5 T H A V E S E L S T N E SE 285TH ST 52 N D P L S 9TH ST SE 67 T H L N S E OUTLET COLLECTION WAY SW SE 307TH PL I S A A C A V E S E H A Z E L A V E S E 28TH ST SE 11TH ST NE T S T N E 15TH ST SE SE 42ND ST 26TH ST NE SE 299TH PL 45TH S T N E J S T N E S 303RD PL SE 308TH PL SE 281ST ST SE 290TH PL HE A T H E R A V E S E 10 9 T H P L S E RA N D A L L A V E S E MAPLE DR SE S 314T H S T 6TH ST SE K S T N E 30TH ST NW NO B L E C T S E U S T S E SE 289TH ST 19TH ST SE SE 297TH ST 5 7 T H D R S E WA R D A V E S E 12 9 T H P L S E I P L N E 21ST ST SE SE 307TH ST 33RD ST SE 55TH ST SE S 324TH ST SE 323RD ST 14TH ST NW WE S T E R N A V E N W 11 7 T H P L S E PI K E S T S E N S T S E SE 292ND ST OL Y M P I C S T S E 11 2 T H P L S E 42ND PL NE SE 296TH ST PARK AVE NE SE 306TH ST 13 4 T H P L S E D P L S E 11 0 T H P L S E 5TH ST NE M DR NE 35TH ST NE F S T N E 8TH ST SW SE 302ND PL U C T N W KA T H E R I N E A V E S E 40TH ST NE 59 T H A V E S SE 300TH ST 16TH ST NW JA S M I N E A V E S E 13 3 R D A V E S E 9T H S T N E 63 R D P L S 2ND ST NE 27TH ST SE 6TH ST NE CROSS S T S E 10 7 T H A V E S E O C T S E JA M E S A V E S E SE 305TH PL S 307TH ST UD A L L A V E S E SE 288TH PL KE N N E D Y A V E S E SE 314TH PL 56 T H P L S SE 313TH ST V PL SE SE 302ND ST S 297TH PL SE 31 8 T H P L 12 1 S T P L S E 56 T H C T S 26TH ST NW SE 293RD ST 37 T H P L S E 12 5 T H A V E S E 11 3 T H P L S E 12 0 T H A V E S E SE 304TH PL S 329TH PL S 292ND PL 71ST ST SE SE 315TH ST S 328TH ST 49TH ST SE S 321ST ST 60 T H P L S SE 321ST PL 67TH C T S E SE 282ND WA Y FR A N K L I N A V E S E 7TH ST NE 12 4 T H P L S E S S T S E SE 322ND PL 3RD CT SE 13 8 T H A V E S E S 298TH PL S 326TH LN 44TH ST SE L P L N E SE 319TH ST SE 325TH PL SE 315TH PL 18 1 S T A V E E 10 0 T H A V E S E W E S L E Y P L S E SE 306TH PL SE 305TH ST 23RD ST NE 12 3 R D A V E S E 17 1 S T A V E E U S T N E PO P L A R S T S E JO R D A N A V E S E SE 306TH CT 53R D A V E S S 294TH PL O C T N E SE 283RD ST 59 T H P L S L C T N E W PL NW EV E R G R E E N W A Y S E PI K E S T N E 30TH ST NE 37TH ST SE SE 288TH PL 57 T H P L S 25TH ST SE 12 1 S T P L S E F S T S E D S T S E D S T S E SE 282ND ST C S T S E L S T S E 36TH S T S E L S T S E N S T S E 11 6 T H A V E S E 29TH ST NW 8TH ST NE K S T S E 55 T H A V E S SE 295TH ST J S T N E R S T N E K S T N E D S T S E EL M S T S E PI K E S T S E SR 18-WEST R A M P H S T S E 72ND ST SE D S T N E SE 286TH ST B S T N W SE 290TH PL SR 18-EAST R A M P H S T N E L S T N E 56 T H A V E S SE 294TH ST 11 2 T H A V E S E SE 288TH ST 23RD ST SE E S T S E 10 8 T H A V E S E I S T S E 10 8 T H A V E S E EL I Z A B E T H A V E S E O S T N E A S T S E N S T N E 10 8 T H A V E S E 11 2 T H A V E S E O S T N E SE 315TH PL 2ND ST SE 4TH ST NE SE 295TH ST D S T S E SE 310TH ST 51 S T A V E S R S T N W SE 302ND ST L E G E N D Proposed Sewers Proposed Gravity Proposed LPFM Proposed Force Main Proposed Pump Station Ex. COA Pump Station Ex. King County Pump Station Ex. Other Pump Station King County Sewers Force Main Gravity Main Auburn Sewers Force Main Gravity Main Private Force Main Private Gravity Main City of Auburn Sewer Service Area County line Buildings Paved Surfaces Water Bodies Wetlands Parcels Steep Slopes FIGURE 5 - 6 CITY OF AUBURN COMPREHENSIVE SEWER PLAN EXISTING AND PROPOSED SEWER FACILITIES 1,000 0 1,000 2,000Feet P:\Auburn\145308 Auburn Sewer Comp Plan Update\_GIS\Projects\Plan Figures\fig_5-2_SewerExtensions.mxd 1 inch = 1,000 feet March 2015 N King CountyPierce County