Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout06-15-2015 CITY COUNCIL AGENDA PACKETAlityrB
URN
WASHINGTON
City Council Meeting
June 15, 2015 - 7:00 PM
Auburn City Hall
AGENDA
Watch the meeting LIVE!
Watch the meeting video
M eeti ng videos are not avai I abl e unti 172
hours after the meeting has concluded.
I. CALL TO ORDER
A. Pledge of Allegiance
B. Roll Call
II. ANNOUNCEMENTS, PROCLAMATIONS, AND PRESENTATIONS
III. APPOINTMENTS
IV. AGENDA MODIFICATIONS
V. CITIZEN INPUT, PUBLIC HEARINGS & CORRESPONDENCE
A. Public Hearings
1. Public Hearing on 2016 -2021 Transportation Improvement Program
(Snyder)
City Council to conduct a public hearing to receive public comments and
suggestions with regard to the proposed 2016 -2021 Transportation
Improvement Program (TIP)
B. Audience Participation
This is the place on the agenda where the public is invited to speak to the City
Council on any issue. Those wishing to speak are reminded to sign in on the
form provided.
C. Correspondence
There is no correspondence for Council review.
VI. COUNCIL AD HOC COMMITTEE REPORTS
Council Ad Hoc Committee Chairs may report on the status of their ad hoc
Council Committees' progress on assigned tasks and may give their
recommendation to the City Council, if any.
VII. CONSENT AGENDA
All matters listed on the Consent Agenda are considered by the City Council to be
routine and will be enacted by one motion in the form listed.
A. Minutes of the March 30, 2015 City Council Study Session*
Page 1 of 146
B. Minutes of the April 27, 2015 City Council Study Session*
C. Minutes of the June 1, 2015 Regular City Council Meeting*
D. Minutes of the June 4, 2015 Special City Council Meeting*
E. Claims Vouchers (Coleman)
Claims voucher numbers 433845 through 434103 in the amount of
$3,512,909.06 and one wire transfer in the amount of $77.00 and dated June 15,
2015.
F. Payroll Vouchers (Coleman)
Payroll check numbers 535615 through 535655 in the amount of $937,608.66,
electronic deposit transmissions in the amount of $1,413,005.34 f or a grand
total of $2,350,614.00 for the period covering May 28, 2015 to June 10, 2015.
(RECOMMENDED ACTION: City Council approve the Consent Agenda.)
VIII. UNFINISHED BUSINESS
IX. NEW BUSINESS
X. ORDINANCES
A. Ordinance No. 6563 (First Reading)* (Coleman)
An Ordinance of the City Council of the City of Auburn, Washington, amending
Ordinance No. 6533, the 2015 -2016 Biennial Budget Ordinance, as amended by
Ordinance No. 6558, authorizing amendment to the City of Auburn 2015 -2016
Budget as set forth in Schedule "A" and Schedule "B"
(RECOMMENDED ACTION: City Council adopt Ordinance No. 6563.)
XI. RESOLUTIONS
A. Resolution No. 5146* (Snyder)
A Resolution of the City Council of the City of Auburn, Washington, approving
the 2016 -2021 Transportation Improvement Program of the City of Auburn
pursuant to R.C.W. Chapter 35.77 of the laws of the State of Washington
(RECOMMENDED ACTION: City Council adopt Resolution No. 5146.)
XII. MAYOR AND COUNCILMEMBER REPORTS
At this time the Mayor and City Council may report on their significant City- related
activities since the last regular Council meeting.
A. From the Council
B. From the Mayor
XIII. ADJOURNMENT
Agendas and minutes are available to the public at the City Clerk's Office, on the City
website (http: / /www.auburnwa.gov), and via e -mail. Complete agenda packets are
available for review at the City Clerk's Office.
Page 2 of 146
*Denotes attachments included in the agenda packet.
Page 3 of 146
PH.1
AuBuRN 1YY CAF �
wAs - IENGTo
AGENDA BILL APPROVAL FORM
Agenda Subject: Date:
Public Hearing on 2016 -2021 Transportation Improvement June 8, 2015
Program
Department:
CD & PW
Attachments:
No Attachments Available
Administrative Recommendation:
Budget Impact:
$0
City Council conduct a public hearing to receive public comments and suggestions
with regard to the proposed 2016 -2021 Transportation Improvement Program (TIP).
Attachments can be found with Resolution No. 5146.
Background Summary:
Pursuant to RCW 35.77.010 the City of Auburn is required to annually prepare and
adopt a comprehensive Transportation Improvement Program (TIP) for each ensuing
six calendar years. The TIP is the detailed programming document for transportation
improvements over a six year period. The plan is intended to ensure that the City will
have available advance plans as a guide in carrying out a coordinated street
construction program.
The City Council is required to conduct a public hearing to review and to adopt any
amendments or revisions to the approved plan.
The date of public hearing was set by Resolution No. 5145 on June 1, 2015.
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
Staff: Snyder
Item Number: PH.1
AUBURN * MORE THAN YOU IMAGINED Page 4 of 146
AuBuRN 1YY CAF �
\VASHENG`O
AGENDA BILL APPROVAL FORM
Agenda Subject:
Minutes of the March 30, 2015 City Council Study Session
Department:
City Council
Attachments:
03-30- -2015
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
Date:
June 3, 2015
Budget Impact:
$0
Staff:
Item Number: CA.A
CA.A AUBURN * MORE THAN YOU IMAGINED Page 5 of 146
Au&
7Y or
i r
WASHINGTON
City Council Study Session
March 30, 2015 - 5:30 PM
Council Chambers
MINUTES
I. CALL TO ORDER
Deputy Mayor John Holman called the meeting to order at 5:37 p.m. in
the Council Chambers at Auburn City Hall, 25 West Main Street in
Auburn.
A. Roll Call
City Councilmembers present: Deputy Mayor Holman, Rich
Wagner, Bill Peloza, Wayne Osborne, Claude DaCorsi and Yolanda
Trout. Councilmember Largo Wales was excused.
Department Directors and staff members present included:
Community Development and Public Works Director Kevin Snyder,
Public Affairs and Marketing Liaison Dana Hinman, Parks, Arts and
Recreation Director Daryl Faber, Innovation and Technology
Operations Manager Ashley Riggs, Innovation and Technology
Customer Support Manager Reba Stowe, City Attorney Daniel B.
Heid, Director of Administration Michael Hursh, Finance Director
Shelley Coleman, Police Chief Bob Lee, Police Commander Steve
Stocker, Assistant Director of Engineering Services /City
Engineer Ingrid Gaub, Assistant Director of Community
Development Services Jeff Tate, Storm Drainage Engineer Tim
Carlaw, Water Quality Program Coordinator Chris Thorn, and
Deputy City Clerk Shawn Campbell.
II. Announcements, Reports, and Presentations
A. Use of Force Review and Commendations, Inquiries and Allegations
of Misconduct (30 Minutes Presentation) (Stocker)
Chief Lee explained this is the first year this report has been
compiled to provide to Council. In the past the report was only
provided to the Mayor. The report is required by the State of
Washington for accreditation. The report shows the Police
Departments training needs and areas in need of improvement both
individually and as a department. The Police department is sharing
this report with Council and the public to be more transparent and
gain more public trust.
Chief Lee introduced Commander Steve Stocker. Commander
Stocker explained the Police Department creates a Commendatioonsbf 5
CA.A Page 6 of 146
Inquiries and Allegations of Misconduct (CIA) report at the end of
each year. The Auburn Police Department responded to 89,350
CAD incidents in 2014, creating 18,174 case reports, 5,189 arrests,
booked 2,940 people into SCORE jail, and issued 9,495
infraction /citations. He also stated this is only a portion of officer
interaction with citizens. He reviewed the different areas of the
report.
Commendations are used to recognize action or performance of
members of the Police Department who act or perform in a manner
that is outstanding or beyond what is normally expected. A
basic commendation usually consist of a call or email from inside or
outside the City.
Internal investigations involve a complaint or a possible violation of
department standards, written directive, City policies or applicable
civil service rules. The investigation can begin internally or from a
citizen complaint.
Supervisory Inquiries involve a complaint made regarding the quality
of service delivery. The complaints vary in degree and are usually
handled by the employee's immediate supervisor.
Commander Stocker reviewed the Internal Investigations,
Supervisory Inquiries and Commendations at the Auburn Police
Department from 2009 to 2014.
Councilmember Wagner asked if the complaints typically come from
lawyers or citizens. Commander Stocker stated most complaints are
received from citizens.
Commander Stocker reviewed the statistics for collisions in 2014.
The Police Department had 32 collisions in 2014, of those 22 were
deemed preventable.
Councilmember Trout inquired regarding actions taken if an
employee is found to have had misconduct. Commander Stocker
explained the City looks at the employee, the seriousness of the
event and then typically coaching and counseling appropriate to the
offense.
Commander Stocker reviewed the use of force or response to
resistance statistics. The Auburn Police department received no
allegations of excessive use of force in 2014.
Deputy Mayor Holman asked what constitutes use of force.
Commander Stocker explained there is no longer a threshold for
when an interaction with a suspect becomes use of force, now
Page 2 of 5
CA.A Page 7 of 146
anytime a suspect resists in any way and the officer needs to
respond it is categorized as use of force.
Councilmember Trout noted the takedown methods in the report and
asked for clarification on the what constitutes a takedown.
Commander Stocker explained takedowns are a hands on event,
if the report writing software does not have the exact type of
takedown the officer will select general takedown.
Deputy Mayor Holman asked what the City of Auburn's policy is on
lateral vascular holds. Commander Stocker explained the City of
Auburn allows officers to use the lateral vascular hold as long as
they have the proper training. The trainers for the City of Auburn
Police Department have gone through national training.
Commander Stocker reviewed the effective versus non effective use
of force techniques. In 36% of the use of force incidents, suspects
reported an injury, only 6% of officers reported injury after a use of
force event.
Councilmember DaCorsi asked about the effectiveness of tasers.
Commander Stocker stated Tasers are effective about 50% of the
time.
Chief Lee stated accidents are up in 2014, the department has hired
approximately 40 new people in the last several years. Most of the
accidents are backing accidents. The department is working with the
new staff on coaching and training. The department requires every
officer to attend 40 hours of crisis intervention training at the
Washington State Academy. The supervisors up through command
staff are required to take a Leadership in Police Organization
training.
Mayor Backus stated these statistical reports have been issued
each year. She wants the information to be transparent for citizens
and Council.
Councilmember Peloza stated this is the first report with this type of
information that has been provided to Council. He feels this will
be very valuable information for both Council and the citizens of
Auburn. He asked how much training each officer receives
each year. Commander Stocker said each officer receives a
minimum of two days of training each year. Many officers receive
additional training beyond the minimum.
111. AGENDA MODIFICATIONS
CA.A
Deputy Mayor Holman stated he wanted to discuss the Finance ad hoc
committee under other discussion items.
Page 3 of 5
Page 8 of 146
IV. AGENDA ITEMS FOR COUNCIL DISCUSSION
CA.A
A. Low Impact Development Initial Briefing (15 Minutes Presentation 15
Minute Discussion) (Carlaw)
Storm Drainage Engineer Carlaw and Water Quality Program
Coordinator Thorn presented Council with the Low Impact
Development briefing.
Storm Drainage Engineer Carlaw stated the City has a federal
permit which has six requirements. The requirements are public
education and outreach, public participation and involvements, illicit
discharge detection and elimination, construction site runoff control,
post construction runoff control, pollution prevention and good
housekeeping. The State of Washington permit added maximum
daily load compliance and monitoring to the requirements. Failure to
comply with all NPDES Phase II requirements puts the City at risk of
fines, third party lawsuits and jeopardizes the City's ability to secure
grants and loans.
Storm Drainage Engineer Carlaw explained in 2012, 13
municipalities including the City of Auburn appealed the new
requirements. In 2013 the Pollution Control Hearing Board decision
on the appeal resulted in changes to the watershed -scale
stormwater planning condition and new or revised definitions of
conveyance system, discharge point, outfall, and receiving
waterbody or receiving waters.
Councilmember Wagner stated the State wanted to City to do the
monitoring. Water Quality Program Coordinator Thorn explained the
Federal Government does not have a requirement for monitoring.
That requirement comes from the State. The City has to either
do the monitoring in house or enter into a group.
Water Quality Program Coordinator Thorn reviewed the Stormwater
Management methods. The City has managed stormwater in
traditional methods, the City is looking at the low impact
development practices and ways to incorporate the changes to the
City's system.
Water Quality Program Coordinator Thorn reviewed the LID
Stormwater Facilities. The facilities reduce volume thereby
minimizing high flows, remove pollutants from stormwater, replenish
streams and wetlands through shallow groundwater, reduce the size
of conventional stormwater facilities, increase open space, are
visually attractive, can result in construction and maintenance cost
savings, and can increase densities.
Water Quality Program Coordinator Thorn reviewed different types
Page4of5
Page 9 of 146
of Low Impact development; including bioretention,
permeable pavement, rain garden, dispersion, downspout
dispersion, sheet flow, vegetated roofs, rainwater harvesting
and minimal excavation.
Water Quality Program Coordinator Thorn stated the NPDES Permit
does require the City to require low impact development where
feasible, review and amend local codes and standards, site and
submission scale requirements, and have LID on small, medium
and large projects.
Storm Drainage Engineer Carlaw reviewed the schedule for the next
three years. The City is required to update the City Code to meet the
new requirement before January 2017. The City will have to do more
education, training, inspection maintenance and the cost to the City
and the developers will be higher.
Councilmember Wagner stated costs need to be a part of what is
considered for the feasibility of a project. Director Snyder stated the
consideration of cost for the feasibility of a project is limited by the
State.
V. OTHER DISCUSSION ITEMS
A. Finance Ad Hoc Committee
Deputy Mayor Holman stated the current assignments to the
Finance ad hoc Committee are scheduled end. He requested
Councilmembers consider who would like to step down from the
current Committee and who would like to step up to be on the
Committee. In the future a new member will be appointed to
the Committee every quarter and the member that has served two
terms will step down.
VI. ADJOURNMENT
CA.A
There being no further discussion, the meeting adjourned at 6:40 p.m.
APPROVED this day of , 2015.
JOHN HOLMAN, DEPUTY MAYOR Shawn Campbell, Deputy City Clerk
Page 5 of 5
Page 10 of 146
CA.B
AuBuRN 1YY CAF �
\VASH E NGTo
AGENDA BILL APPROVAL FORM
Agenda Subject:
Minutes of the April 27, 2015 City Council Study Session
Department:
Administration
Attachments:
4/27/2015 minutets
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
Date:
June 8, 2015
Budget Impact:
$0
Staff:
Item Number: CA.B
AUBURN * MORE THAN YOU IMAGINED Page 11 of 146
Au&
7Y or
i r
WASHINGTON
City Council Study Session
April 27, 2015 - 5:30 PM
Auburn City Hall
MINUTES
I. CALL TO ORDER
Deputy Mayor John Holman called the meeting to order at 5:30 p.m. in
the Council Chambers at Auburn City Hall, 25 West Main Street in
Auburn.
A. Roll Call
City Councilmembers present: Deputy Mayor Holman, Rich
Wagner, Bill Peloza, Largo Wales, Wayne Osborne, Claude
DaCorsi, Yolanda Trout.
City officials and staff members present included: Mayor Nancy
Backus, City Attorney Daniel B. Heid, Community Development and
Public Works Director Kevin Snyder, Assistant Director of
Engineering Services /City Engineer Ingrid Gaub, Planning Services
Manager Jeff Dixon, Finance Director Shelley Coleman, Financial
Planning Manager Bob Brooks, Utilities Engineering Manager Lisa
Tobin, Assistant Chief of Police William Pierson, Director of
Administration Michael Hursh, Public Affairs and Marketing Liaison
Dana Hinman, IT Operations Manager Ashley Riggs, IT Customer
Support Manager Reba Stowe, and Deputy City Clerk Shawn
Campbell.
II. AGENDA ITEMS FOR COUNCIL DISCUSSION
A. Bureau of Prisons Proposal
Mayor Backus explained the City received a letter from the Rever
Corporation stating they submitted a proposal to site a facility at the
Comfort Inn in the City of Auburn. The City sent a letter opposing the
siting of the facility. The owner of the Comfort Inn does not intend to
sell his business. The Bureau of Prisons did not notify the City that
an application had been submitted for a location within the City of
Auburn.
Councilmember Wagner stated he understands the need for this
type of facility. The proposed placement is not a good fit. He
suggested the City coordinate with the Muckleshoot Indian Tribe to
oppose the location together. Councilmember DaCorsi noted
the City was not notified of the comment period by the Bureau of
Page 1 of 4
CA.B Page 12 of 146
CA.B
Prisons or the Rever Corporation. He requested the City seek their
Washington State Congressional delegates to prepare a letter of
opposition to the location.
B. SCORE Report (15 Minute Presentation /5 Minute Discussion)
(Coleman)
Director Coleman explained the contract with SCORE sets the
amount the City pays for the jails operating budget based on the
previous year's average daily population for each member
city. Director Coleman reviewed the average daily population for
the SCORE jail during the last 5 years. Based on the average daily
population in 2014 the City of Auburn will provide 23% of SCORE'S
operating budget.
Director Coleman stated she would like to begin paying the annual
payments for the debt service payment from revenues for renting the
vacant beds that the member cities are not using.
Councilmember Wales asked what the City pays for the medical
needs of inmates. Director Coleman stated there is a fund for normal
medical screening. If an inmate needs additional care the City is
responsible for any added cost. Councilmember Wales suggested
the City enroll inmates in the Affordable Care Act with King County
Board of Health.
C. Resolution No. 5144 (10 Minute Presentation /10 Minute Discussion)
(Coleman)
A Resolution of the City Council of the City of Auburn, Washington,
authorizing the Mayor to execute Addendum Number V to the fixed -
base lease at the Auburn Airport initially between Sky Services, Inc.,
currently Auburn Flight Services and the City of Auburn
Director Coleman introduced Resolution No. 5144. She explained
the original lease with Auburn Flight Service was entered into in
1978 and there is a 30 year renewal option as of May 2018. The
current owner would like to sell the business to Cascade Helicopter
Services. In order for the buyer to secure financing he will need to
the option of a longer lease for the land. He has requested a 50 year
lease. The resolution includes changing the number of years on the
renewal from 30 to 50 years and approval from the City for the
purchase and sale for the building.
Councilmember Wales asked if the Auburn Municipal Airport has a
lot of helicopter use currently. Director Colman explained the Auburn
Municipal Airport is the third or fourth busiest airport in the State and
50% of the activity is helicopters. Councilmember Wagner would like
the City to discourage helicopter training at the Auburn Municipal
Airport.
Page 2 of 4
Page 13 of 146
CA.B
Director Coleman explained the potential client services helicopters,
provides helicopter charter services and eventually intends to sell
helicopters at this location. They are not a training location.
Councilmember DaCorsi asked where they are located currently.
Director Coleman stated Cascade Helicopter Services is currently
located at Boeing Field.
Councilmember Osborne stated the Auburn Municipal Airport is
qualified for a control tower.
Councilmember Wales stated the City has invested a lot of
money into the airport. She wants to ensure the City considers all
revenue sources.
Mayor Backus clarified that Cascade Helicopter Services does not
have a training component to their business.
Councilmember Wagner asked if the City can ensure the client will
not start a training program. Director Coleman stated the existing
agreement does allow for training. The City would have to go back
and renegotiate the entire lease agreement.
Mayor Backus noted Cascade Helicopter Services offers good jobs
for the citizens of Auburn.
D. 2015 Comprehensive Storm Drainage Plan Overview (15 Minute
Presentation /15 Minute Discussion (Snyder)
Storm Drainage Engineer Carlaw recapped the 2009 Storm
Drainage Plan Accomplishments. He noted the City is implementing
the last of the 2009 Drainage Plan projects. The new NPDES permit
items include the low impact development as the preferred method.
The City is required to evaluate City codes, standards and policies
to incorporate the new LID principals, increase stormwater
inspection requirements and pay to participate in the Ecology Water
Quality monitoring program. The City plans to adopt a new
stormwater management manual in 2016. The drainage plan has 11
proposed projects including eight conveyance and one pump station
improvement project, a hillside drainage assessment, an update to
the Comprehensive Storm Drainage Plan in six years, and a
composting facility to manage and process vegetation and material
from storm pond and ditch restorations.
Councilmember Peloza asked how the City assesses the hillside
drainage. Storm Drainage Engineer Carlaw explained the City has to
first locate the outfalls, then assess their condition.
Storm Drainage Engineer Carlaw reviewed the capital improvement
Page 3 of 4
Page 14 of 146
project locations and explained how the projects are prioritized. The
future projects include the West Main Street Pump Station upgrade,
37th and I Street NW including the Interurban Trail, the hillside
drainage assessment, 30th Street NE Area Flooding Phase 2 and 3,
the West Hill drainage improvements, and D Street SE Storm
Improvements.
Storm Drainage Engineer Carlaw stated the City is planning to
increase the frequency of ditch maintenance, improve City's ability to
maintain stormwater ponds, continue to perform system inspections
and condition assessments, and continue the easement review and
acquisition program.
III. OTHER DISCUSSION ITEMS
There was no other discussion
IV. ADJOURNMENT
There being no further discussion, the meeting adjourned at 6:28 p.m.
CA.B
APPROVED this day of , 2015.
JOHN HOLMAN, DEPUTY MAYOR Shawn Campbell, Deputy City Clerk
Page 4 of 4
Page 15 of 146
CA.0
AuBuRN 1YY CAF �
\VASH E NGTo
AGENDA BILL APPROVAL FORM
Agenda Subject:
Minutes of the June 1, 2015 Regular City Council Meeting
Department:
Administration
Attachments:
Minutes
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
Date:
June 9, 2015
Budget Impact:
$0
Staff:
Item Number: CA.0
AUBURN * MORE THAN YOU IMAGINED Page 16 of 146
UBURN
WASHINGTON
City Council Meeting
June 1, 2015 - 7:00 PM
Auburn City Hall
MINUTES
I. CALL TO ORDER
A. Pledge of Allegiance
Mayor Nancy Backus called the meeting to order at 7:00 p.m. in the Council
Chambers located in Auburn City Hall, 25 West Main Street in Auburn, and led
those in attendance in the Pledge of Allegiance.
B. Roll Call
City Councilmembers present: Rich Wagner, Bill Peloza, Largo Wales,
Wayne Osborne, Claude DaCorsi, and Yolanda Trout. Deputy Mayor John
Holman was excused.
Department Directors and staff members present included: City Attorney
Daniel B. Heid, Community Development and Public Works Director Kevin
Snyder, Director of Administration Michael Hursh, Innovation and Technology
Customer Support Manager Reba Stowe, Assistant Director of Engineering
Services /City Engineer Ingrid Gaub, Public Affairs and Marketing Manager
Dana Hinman, Innovation and Technology Operations Manager Ashley Riggs,
Parks, Arts and Recreation Director Daryl Faber, Police Commander Mark
Caillier, Transportation Manager Pablo Para, Financial Planning Manager Bob
Brooks, and City Clerk Danielle Daskam.
II. ANNOUNCEMENTS, PROCLAMATIONS, AND PRESENTATIONS
A. Proclamation - Human Trafficking Awareness
Mayor Backus to proclaim Human Trafficking Awareness in the City of
Auburn.
Mayor Backus read and presented a proclamation bringing attention to efforts
to combat commercial sexual exploitation and human trafficking in King
County to Robert Beiser, Executive Director of Seattle Against Slavery.
Mr. Beiser thanked Mayor Backus and the City Council for their support and
spoke briefly about the fight against human trafficking in King County.
III. APPOINTMENTS
There was no appointment for Council's consideration.
IV. AGENDA MODIFICATIONS
There was no change to the agenda.
V. CITIZEN INPUT, PUBLIC HEARINGS & CORRESPONDENCE
A. Public Hearings
No public hearing was scheduled for this evening.
CA.0
Page 1 of 5
Page 17 of 146
B. Audience Participation
This is the place on the agenda where the public is invited to speak to the City
Council on any issue. Those wishing to speak are reminded to sign in on the
form provided.
No one in the audience requested to address the Council.
Correspondence
There was no correspondence for Council review.
VI. COUNCIL AD HOC COMMITTEE REPORTS
Council Ad Hoc Committee Chairs may report on the status of their ad hoc
Council Committees' progress on assigned tasks and may give their
recommendations to the City Council, if any.
Councilmember Wales reported on behalf of the Council ad hoc committee on
finance that reviews claims and payroll vouchers. Councilmember Wales reported
she and Councilmember Osborne reviewed the claims and payroll vouchers
reflected on this evening's Consent Agenda. The ad hoc committee recommends
approval of the claims and payroll vouchers as presented.
VII. CONSENT AGENDA
C.
All matters listed on the Consent Agenda are considered by the City Council to be
routine and will be enacted by one motion in the form listed.
A. Minutes of the May 18, 2015 City Council Meeting
B. Claims Vouchers (Coleman)
Claims voucher numbers 433681 through 433844 and three wire transfers in
the total amount of $3,983,457.23 and dated June 1, 2015.
Payroll Vouchers (Coleman)
City Council approve payroll vouchers 535575 through 535614 in the amount
of $295,466.58 and electronic deposits in the amount of $1,351,235.76 for a
grand total of $1,646,702.34 for the period covering May 14, 2015 to May 27,
2015.
C.
Interim Deputy Mayor Osborne moved and Councilmember Wales seconded
to adopt the Consent Agenda.
The Consent Agenda includes minutes, claims vouchers and payroll vouchers.
MOTION CARRIED UNANIMOUSLY. 6 -0
VIII. UNFINISHED BUSINESS
There was no unfinished business.
IX. NEW BUSINESS
CA.0
A. SCORE Jail Report (Mayor Backus)
Mayor Backus is the City's representative on the South Correctional Entity
(SCORE) Board and presented a PowerPoint presentation on SCORE jail
statistics. The SCORE member cities include Auburn, Renton, Federal Way,
Tukwila, Burien, SeaTac and Des Moines.
Page 2 of 5
Page 18 of 146
Mayor Backus reviewed SCORE Member City Billable Average Daily
Population (ADP) for April 2015. Auburn's ADP in April was 57 compared to
Auburn's March ADP of 68. The ADP for the SCORE facility in April was
304, down from the March ADP of 331.
Graphs for Total ADP by Month and Year and Auburn Billable Average Daily
Population were reviewed. In April 2015 total ADP for member and contract
entities was 636 down from 672 in March 2015.
Auburn's Billable ADP for 2013 - 2015 reflects a continuing decline in billable
ADP. Auburn's 2013 Budget ADP was 122, and Auburn's 2014 Budget ADP
was 97. Auburn's 2015 Budget ADP is 79.
Mayor Backus also reviewed Total Bookings for Member and Contract
Agencies, April 2014 -April 2015; Member Bookings by Agency, March 2014 to
April 2015; Member Agency Bookings by Type for April 2015; and Contract
Inmates ADP for April 2015.
X. ORDINANCES
A. Ordinance No. 6557 (Second Reading) (Faber)
An Ordinance of the City Council of the City of Auburn, Washington, creating a
new Chapter 2.23 to the City Code entitled Special Event Permits, and
amending Section 8.28.010 of the City Code relating to Special Event permits
Interim Deputy Mayor Osborne moved to amend and adopt Ordinance No.
6557 with the following changes: delete paragraph G(3) from Section
2.23.010 and adjust the remaining paragraphs accordingly and include the
amendments suggested at the last meeting and included in the version of the
ordinance presented this evening. Councilmember Peloza seconded.
Interim Deputy Mayor Osborne stated paragraph G(3) in Section 2.23.010
relates to parties on private property and should be excluded from the
ordinance. Director Faber pointed out that paragraph G(4) provides for
permitting parties on private party when the event is large enough to impact
City services.
MOTION TO ADOPT ORDINANCE NO. 6557 AS AMENDED CARRIED
UNANIMOUSLY. 6 -0
XI. RESOLUTIONS
A. Resolution No. 5145 (Snyder)
A Resolution of the City Council of the City of Auburn, Washington, setting the
time and date for a public hearing before the City Council on the 2016 -2021
Transportation Improvement Plan
Interim Deputy Mayor Osborne moved and Councilmember Wales seconded
to adopt Resolution No. 5145.
Interim Deputy Mayor Osborne stated Resolution No. 5145 sets the date for a
public hearing on the annual update of the Transportation Improvement Plan.
MOTION CARRIED UNANIMOUSLY. 6 -0
Resolution No. 5147 (Snyder)
CA.0
Page 3 of 5
Page 19 of 146
B. A Resolution of the City Council of the City of Auburn, Washington, initiating
street vacation proceedings and setting a public hearing to consider the
vacation of right -of -way in the vicinity of the northeast corner of South Division
Street and 2nd Street SE
Councilmember Wales moved and Councilmember DaCorsi seconded to
adopt Resolution No. 5147.
C.
Community Development and Public Works Director Snyder explained the
resolution sets a public hearing on the application for vacation of right -of -way
located on the northeast corner of South Division Street and 2nd Street SE
and adjacent to the Merrill Gardens project. The vacation would facilitate the
project design and create a plaza effect on the northeast corner.
MOTION CARRIED UNANIMOUSLY. 6 -0
Resolution No. 5148 (Coleman)
A Resolution of the City Council of the City of Auburn, Washington,
authorizing the City to apply for and, if awarded, to accept grant funds in the
amount of $8,050.00 from the Washington State Department of
Transportation, Aviation Division, to perform an environmental assessment as
part of the North and South Runway Enhancement Project for the Auburn
Municipal Airport and authorizing the execution of the grant agreement
therefor
Interim Deputy Mayor Osborne moved and Councilmember Wales seconded
to adopt Resolution No. 5148.
Resolution No. 5148 authorizes the acceptance of a grant in the amount of
$8,050.00 from the State Department of Transportation Aviation Division for
an airport project.
MOTION CARRIED UNANIMOUSLY. 6 -0
D. Resolution No. 5149 (Coleman)
A Resolution of the City Council of the City of Auburn, Washington,
authorizing the City to apply for and, if awarded, to accept grant funds in the
amount of $144,900.00 from the Federal Aviation Administration, to perform
an environmental assessment as part of the North and South Runway
Enhancement Project for the Auburn Municipal Airport and authorizing the
execution of the grant agreement therefor
Interim Deputy Mayor Osborne moved and Councilmember DaCorsi seconded
to adopt Resolution No. 5149.
Resolution No. 5149 authorizes the acceptance of a grant in the amount of
$144,900.00 from the Federal Aviation Administration.
MOTION CARRIED UNANIMOUSLY. 6 -0
XII. MAYOR AND COUNCILMEMBER REPORTS
At this time the Mayor and City Council may report on their significant City- related
activities since the last regular Council meeting.
A. From the Council
CA.0
Page 4 of 5
Page 20 of 146
Councilmember DaCorsi reported on his attendance at the Auburn School
District meet and greet for superintendent candidates, Auburn's Memorial Day
ceremonies, and the Merrill Gardens groundbreaking ceremony.
Councilmember Wales reported she attended the King County Board of
Health and Pierce County Board of Health meetings recently. Councilmember
Wales updated the Council on the current work of both Health Boards.
Councilmember Wagner reported he attended the 50th anniversary
celebration of the Muckleshoot Indian Tribe Head Start Program. He
commended the Muckleshoot Indian Tribe on the success of their program.
Councilmember Peloza reported on his attendance at the South County Area
Transportation Board meeting, the Auburn Airport Advisory Board meeting,
the King County Water Pollution Abatement Advisory Committee meeting, the
50th anniversary celebration of the Muckleshoot Indian Tribe Head Start
Program, and Auburn's Memorial Day ceremonies. Councilmember
Peloza reminded that the Auburn International Farmers Market opens its
seventh season this coming Sunday.
Councilmember Trout reported she attended the 50th anniversary celebration
of the Muckleshoot Indian Tribe Head Start Program, a Domestic Violence
Task Force meeting, and the Merrill Gardens groundbreaking ceremony.
B. From the Mayor
Mayor Backus reported she toured the Federal Aviation Administration facility
in Auburn. Mayor Backus also reported she attended the Junior Tanoa
Bowl Showcase of Champions, the Auburn Handicap at Emerald Downs,
the Memorial Day ceremony at Mountain View Cemetery, Merrill Gardens
groundbreaking, Military Appreciation Day events, the retirement
celebration for Police Officer James Hamill who is pursuing a new career in
nursing, and administered the oath to two new police officers.
XIII. ADJOURNMENT
There being no further business before the Council, the meeting adjourned at 7:40
p.m.
APPROVED this 15th day of June, 2015.
CA.0
NANCY BACKUS, MAYOR Danielle Daskam, City Clerk
Page 5 of 5
Page 21 of 146
CA.D
AuBuRN 1YY CAF �
\VASH E NGTo
AGENDA BILL APPROVAL FORM
Agenda Subject:
Minutes of the June 4, 2015 Special City Council Meeting
Department:
Administration
Attachments:
Minutes
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
Date:
June 9, 2015
Budget Impact:
$0
Staff:
Item Number: CA.D
AUBURN * MORE THAN YOU IMAGINED Page 22 of 146
UBURN
WASH INGTON
Special City Council Meeting
June 4, 2015- 8:30 AM
Council Chambers
MINUTES
I. CALL TO ORDER
Mayor Nancy Backus called the special meeting of the Auburn City Council to
order at 8:30 a.m. in the Council Chambers located at Auburn City Hall, 25 West
Main Street, Auburn, WA, 98001. The City Council met in special session for the
purpose of awarding a bid for Public Works Project No. CP1414, 2015 Local
Street Pavement Reconstruction Project.
City Councilmembers present: Deputy Mayor Holman, Rich Wagner, Bill Peloza,
Largo Wales, Wayne Osborne, Claude DaCorsi, and Yolanda Trout.
Department Directors and staff members present included: City Attorney Daniel
B. Heid, Innovation and Technology Operations Manager Ashley Riggs,
Innovation and Technology Customer Support Manager Reba Stowe, Community
Development and Public Works Director Kevin Snyder, Assistant Director of
Engineering Services /City Engineer Ingrid Gaub, Transportation Manager Pablo
Para, Assistant City Engineer Jacob Sweeting, Street Systems Engineer Jai
Carter, Assistant Police Chief William Pierson, and City Clerk Danielle Daskam.
II. ACTION
A. Public Works Project No. CP1414 (Snyder)
City Council award Contract No. 15 -11, to Titan Earthwork, LLC on their low
bid of $2,213,160.75 plus Washington State sales tax of $61,840.06 for a
total contract price of $2,275,000.81 for Project No. CP1414 — 2015 Local
Street Pavement Reconstruction Project
Streets Systems Engineer Jai Carter explained Public Works Project No.
CP1414 is part of the City's Local Street Preservation (SOS) Program and
will rebuild the following streets: 7th Street SE between A Street SE and
Auburn Way South; D Street SE between Auburn Way South and 12th Street
SE; D Street SE between 37th Street SE and 41st Street SE; and the east
half of K Street SE between 17th Street SE and 21st Street SE. The project
will also replace utilities that are near the end of their service life within these
streets.
Engineer Carter reported staff recommends award of the bid to Titan
Earthwork on their low bid of $2,213,160.75 plus Washington State sales tax
of $61,840.06 for a total contract price of $2,275,000.81. Five responsive
bids were received and Titan Earthwork's bid was the lowest responsive bid
and 9.5% lower than the engineer's estimate.
Engineer Carter displayed design drawings of the D St SE reconstruction
between Auburn Way South and 12th Street SE. In response to questions
from Council, Engineer Carter explained the street will be narrowed to meet
the standard for local residential streets; no parking will be lost as a result of
Page 1 of 2
CA.D Page 23 of 146
the project. Street construction along the streets fronting Terminal Park
Elementary and Olympic Middle School will be constructed first with
construction complete by September 7, 2015, to accommodate the start of
the school year.
Engineer Carter reviewed the construction drawings for K Street SE.
Engineer Carter explained the western side of K Street SE was reconstructed
in 2006 during a storm drainage project. The east side of K Street between
17th Street SE and 21st Street SE has failed. The new construction of the
east side of K Street SE will match the previously reconstructed west side,
and a two inch overlay will be added to the full street.
Engineer Carter stated that with the narrowing of D Street SE, impervious
surfaces will be reduced and new grass strips will be created. The new
grass strips will mirror other parts of the street and improve drainage in the
area.
Councilmembers Peloza and Wagner expressed concern with creating more
grass strips that require maintenance by the adjacent commercial property
owners. Councilmembers Peloza and Wagner suggested that staff look at
other options for grass strips, including pervious concrete in the locations of
commercial properties.
In response to a question from Deputy Mayor Holman, Engineer Carter
explained that the alignment of D Street SE with Auburn Way South will not
change. There is a brief transition /acceleration zone leaving D Street SE at
Auburn Way South.
Deputy Mayor Holman moved and Councilmember Peloza seconded to
approve the award of Public Works Project No. CP1414 to Titan Earthwork.
MOTION CARRIED UNANIMOUSLY. 7 -0
III. ADJOURNMENT
There being no further business, the meeting adjourned at 8:49 a.m.
APPROVED this 15th day of June, 2015.
CA.D
NANCY BACKUS, MAYOR Danielle Daskam, City Clerk
Page 2 of 2
Page 24 of 146
CA.E
C=ITY or
AUBURN
\VASHENG`O
Agenda Subject:
Claims Vouchers
Department:
Administration
AGENDA BILL APPROVAL FORM
Date:
June 8, 2015
Attachments: Budget Impact:
No Attachments Available $0
Administrative Recommendation:
City Council approve the claims vouchers.
Background Summary:
Claims voucher numbers 433845 through 434103 in the amount of $3,512,909.06 and
one wire transfer in the amount of $77.00 and dated June 15, 2015.
Reviewed by Council Committees:
Councilmember:
Staff: Coleman
Meeting Date: June 15, 2015 Item Number: CA.E
AUBURN * MORE THAN YOU IMAGINED Page 25 of 146
CA.F
AuBuRN ITY CAF �
\VASHENG`Or,
AGENDA BILL APPROVAL FORM
Agenda Subject: Date:
Payroll Vouchers June 8, 2015
Department: Attachments: Budget Impact:
Administration No Attachments Available $0
Administrative Recommendation:
City Council approve the payroll vouchers.
Background Summary:
Payroll check numbers 535615 through 535655 in the amount of $937,608.66,
electronic deposit transmissions in the amount of $1,413,005.34 f or a grand total of
$2,350,614.00 for the period covering May 28, 2015 to June 10, 2015.
Reviewed by Council Committees:
Councilmember:
Staff: Coleman
Meeting Date: June 15, 2015 Item Number: CA.F
AUBURN * MORE THAN YOU IMAGINED Page 26 of 146
AuBuRN ITY Cdr •
\VASH E NGTo
Agenda Subject:
Ordinance No. 6563 (First Reading)
Department:
Finance
AGENDA BILL APPROVAL FORM
Attachments:
Transmittal M emo
Ordinance No. 6563
Schedule A
Schedule B
Administrative Recommendation:
Date:
June 8, 2015
Budget Impact:
$0
City Council to introduce and adopt Ordinance No. 6563
Background Summary:
Ordinance No. 6563 (Budget Amendment #2) amends the 2015 -2016 Revised Budget
as presented in the attached transmittal memorandum and supporting attachments.
Reviewed by Council Committees:
Councilmember:
Staff: Coleman
Meeting Date: June 15, 2015 Item Number: ORD.A
ORD.A AUBURN * MORE THAN YOU IMAGINED Page 27 of 146
Interoffice Memorandum
To: City Council
From: Shelley Coleman, Finance Director
CC: Nancy Backus, Mayor
Date: May 21, 2015
Re: Ordinance #6563 — 2015 -2016 Budget Amendment #2
Budget Amendment #2 is the second amendment of the City of Auburn's 2015 -2016 biennial budget. The
main purpose of the second budget amendment of the year is to adjust budgeted 2015 beginning fund
balances to match actual 2015 beginning fund balances per accounting records. Additional items included in
this amendment are recognition of new revenue, either grants or transfers in from other supporting funds,
requests for additional budget authority for projects and removal of discontinued programs. To identify
requested changes to each fund, please refer to the accompanying Schedule A, Summary of 2015 Budget
Adjustments by Fund.
Fund Balance Adjustments: This amendment adjusts City -wide 2015 budgeted beginning fund
balances to reflect actual ending balances as of the end of 2014. City -wide beginning fund balances
are adjusted by a net increase of $8.7 million.
Revenue Adjustments: This amendment recognizes updated revenue projections, predominately an
increase in anticipated REET revenues of $1.4 million.
Carryforward of unspent project spending authority from 2014: This amendment enables the
completion of various projects in 2015 by carrying forward unspent project resources at the end of 2014.
Total amounts requested to be carried forward by fund are:
• General Fund (Fund 001) $ 40,000
• Arterial Street Fund (Fund 102) 158,948
• General Capital Construction Fund (Fund 328) 307,662
TOTAL $ 506,610
Project Funding Adjustments: Project funding requests included in this budget amendment transfer
spending authority or establish additional spending authority for existing projects. Total project funding
requests equal $932,960. Significant project funding requests include:
• Pavement Patching and Overlay (CP 1407 and CP 1506): This amendment adjusts 2015
estimated revenues upward by $190,000 recognizing the expected receipt of contributions
from ICON Materials for this project, and transfers $12,340 from the Marchini Meadows Project
(CP 1407) and $600,000 in REET 2 funds to expand the scope of the 2015 program.
ORD.A AUBURN MORE THAN you I AAG I Page 28 of 146
• Funding for Traffic Signal Improvements Protects (CP 1501 and CP 1503): This amendment
restores previously budgeted funds for this project that had been expended on collision - related
repairs, in the amount of $30,000, and transfers $27,600 from the annual traffic signal
improvements budget for design work related to this project.
• A St SE & 37th St SE Project (CP 1502): This amendment adjusts 2015 estimated revenues
upward by $35,500 recognizing the expected receipt of Federal safety grant funds for this
project.
• Les Gove Park Improvements Project (CP 1510): This amendment adjusts the 2015 budget for
this project upward by $36,000 to purchase synthetic turf for the Discovery Playground, funded
by a transfer from the Parks Department general fund budget.
New Requests:
• Transfer from General Fund to Cumulative Reserve Fund (for counter -
cyclical and /or capital purposes) $ 1,500,000
• Adjust wages for non- benefitted part-time maintenance workers 45,045
• 4Culture grant for LAA funding 12,000
• KCD grant for marketing efforts related to International Farmers' Market 20,000
• Funding construction of columbarium (niche) wall 30,000
TOTAL $ 1,607,045
The following table summarizes the current and revised budget as a result of this amendment.
Table 1: 2015 Budget as Amended
2015 Budget as Amended $ 287,324,703
Budget Amendment #2 (Ord #6563) 13,036,168
Budget as Amended $ 300,360,871
Attachments:
• 1. Proposed Ordinance #6563 (budget adjustment #2)
• 2. Summary of proposed 2015 budget adjustments by fund and department (Schedule A)
• 3. Summary of proposed changes to adopted 2015 budget by fund (Schedule B)
ORD.A AUBURN * MORE THAN YOu INIAGiNFlage 29 of 146
ORDINANCE NO. 6563
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AMENDING ORDINANCE NO.
6533, THE 2015 -2016 BIENNIAL BUDGET ORDINANCE, AS
AMENDED BY ORDINANCE NO. 6558, AUTHORIZING
AMENDMENT TO THE CITY OF AUBURN 2015 -2016
BUDGET AS SET FORTH IN SCHEDULE "A" AND
SCHEDULE "B"
WHEREAS, the Auburn City Council at its regular meeting of December 1,
2014, adopted Ordinance No. 6533 which adopted the City of Auburn 2015 -2016
Biennial budget; and
WHEREAS, the Auburn City Council at its regular meeting of April 6, 2015,
adopted Ordinance No. 6558 which amended Ordinance No. 6533 which adopted
the City of Auburn 2015 -2016 Biennial budget; and
WHEREAS, the City of Auburn deems it necessary to appropriate additional
funds to the various funds of the 2015 budget as outlined in this Ordinance (BA #2);
and
WHEREAS, this Ordinance has been approved by one more than the
majority of all councilpersons in accordance with RCW 35A.34.200.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON DO ORDAIN AS FOLLOWS:
Section 1. Amendment of the 2015 -2016 Biennial Budget. The 2015-
2016 Biennial Budget of the City of Auburn is amended pursuant to Chapter 35A.34
RCW, to reflect the revenues and expenditures as shown on Schedule "A" attached
hereto and incorporated herein by reference. The Mayor of the City of Auburn,
Ordinance No. 6563
May 21,2015
ORE pp1 of 3
Page 30 of 146
Washington is hereby authorized to utilize revenue and expenditure amounts
shown on said Schedule "A" and Schedule "B ". A copy of said Schedule "A" and
Schedule "B" is on file with the City Clerk and available for public inspection.
Section 2. Severability. If any provision of this Ordinance or the
application thereof to any person or circumstance is held to be invalid, the
remainder of such code, ordinance or regulation or the application thereof to other
person or circumstance shall not be affected.
Section 3. Implementation. The Mayor is hereby authorized to
implement such administrative procedures as may be necessary to carry out the
directives of this legislation.
Section 4. Effective Date. This Ordinance shall take effect and be in
force five (5) days from and after its passage, approval and publication as provided
by law.
FIRST READING:
SECOND READING:
PASSED:
APPROVED:
NANCY BACKUS, MAYOR
ATTEST:
Ordinance No. 6563
May 21,2015
ORE pp e2of3
Page 31 of 146
Danielle E. Daskam, City Clerk
APPROVED AS TO FORM:
Daniel B. Heid, City Attorney
PUBLISHED:
Ordinance No. 6563
ppMaagy21,2015
ORU.Ke 3 of 3
Page 32 of 146
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
General Fund (#001)
2015 Adopted Budget
14 592 724
58 767 680
62 813 278
10 547 126
BA#1 (Ordinance #6558)
429,453
77 721
253,474
253 700
BA#2 (Ordinance #6563, Proposed
General Fund Revenues:
4,337,954
23 000
1,596,374 2,718 580
Remove street project (cp1218) from 2015 MIT budget
Community Development and Public Works Department:
55,000) 55,000)
Carry forward in ms1311 (Comprehensive Transportation PIan Upd t
40,000
40,000
Parks Department:
Adjust wages for non-benefitted part-time maintenance workers
36,305 (36,305)
4Culture want for LAA funding
12 000 12 000
KCD grant for mktg/educ efforts related to International Farmers Market
20,000 20,000
Non Departmental:
Transfer funds to Cumulative Reserve Fund T/F to F122
General Fund (multiple departments):
1,500,000 L1 500 000)
Reallocate budget to reflect vacant Fina n moving to CDPW
(11,931) 11,931
Adjust beginning fund balance
4,297,954
4,297 954
Revised 2015 Budget - Fund 001
19,360,132 58,822,401
64,663,126 13,519,406
1 Arterial Street Fund (#102)
2015 Adopted Budget
1 312 844
14 150 590
BA#1 (Ordinance #6558
793,983
BA#2 (Ordinance #6563, Proposed):
674,272
14,354,730
5,714 238 6,508,221
64,620 223,568
1 108 704
515 324
Carry forward budget for c410a0 (S 277th St Wetland Mitigation)
25,200
Increase Federal grant budget for cp1502 (A St SE & 37th St SE)
35 500
Carry forward budget for cp1110 (A St SE Safety Improvements St
dy)
45,000
Transfer budget for cp1501 (Traffic Signal Improvements Project) [T/F from F328]
27 600
Carry forward budget for cp1104 (8th St NE & 104th Ave SE Intersection Improv) 88,748
Increase budget for cp1308 (BNSF Utility Crossing Project) LT/F from F124
Adjust beginning fund balance
1 520
25,200
35,500
45,000
27,600
88,748
1,520
515 324
515 324
Revised 2015 Budget - Fund 102
ORD.A
Page 1 of 9
2,781,100 19,929,448
21,086,519 1,624,028
Page 33 of 146
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Local Street Fund ( #103)
2015 Adopted Budget
1.196.068
1.752.500
2.600.000
348.568
BA #1 (Ordinance #6558)
770,053
770,053
BA #2 (Ordinance #6563, Proposed
76,856
76,856
Adjust beginning fund balance
76,856
76,856
Revised 2015 Budget - Fund 103
2,042,977
1,752,500 3,370,053
425,424
Hotel /Motel Tax Fund ( #104)
2015 Adopted Budget
139,991
94,040
86,000
148,031
BA #1 (Ordinance #6558)
BA #2 (Ordinance #6563, Proposed
26.905
26.905
Adjust beginning fund balance
26,905
26,905
Revised 2015 Budget - Fund 104
166,896
94,040
86,000
174,936
Arterial Street Preservation Fund ( #105)
2015 Adopted Budget
521.910
2.134.700
BA #1 (Ordinance #6558)
2,659,063
BA #2 (Ordinance #6563, Proposed
7
802,340
2,195,410
2,659,063
1,016,283
461.200
(213,936)
Recognize contributions from ICON for cp1407 (Pavement Patching and Overlay)
T/F from cp1407 (Marchini Meadows) for cp1407 Pvmt Patching] lT/F from F3281
Recognize contributions from ICON for cp1506 (Pavement Patching and Overlay)
T/F from REET2 for cp1506 (Pvmt Patching) [T /F from F328]
Increase budget for cp1308 (BNSF Utility Crossing Project)
Adjust beginning fund balance
7
110,000 110,000
12,340 12,340
80,000 80,000
600,000 600,000
213,943 (213,943)
7
Revised 2015 Budget - Fund 105
ORD.A
Page 2 of 9
3,180,980 2,937,040
5,870,756 247,263
Page 34 of 146
1
1
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Drug Forfeiture Fund (#117)
2015 Adopted Budget
505 405
97 100
304 448
298 057
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
34,416
34 416
Adjust beginning fund balance
34,416
34 416
Revised 2015 Budget - Fund 117
539,821
97,100
304,448
332,473
Housing & Comm Develop Fund (#119)
2015 Adopted Budget
27,371
450,000
440,000
37,371
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
17 533
17 533
Adjust beginning fund balance
17,533
17 533
Revised 2015 Budget - Fund 119
44,904
450,000
440,000
54,904
Recreation Trails Fund (#120)
2015 Adopted Budget
36 717
7 130
43 847
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
(761)
(761)
Adjust beginning fund balance
(761)
(761)
Revised 2015 Budget - Fund 120
35,956
7,130
43,086
1 BIA Fund (#121)
2015 Adopted Budget
41,212
55,060
55,000
41,272
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
(9,841)
(9,841)
Adjust beginning fund balance
(9,841)
(9,841)
Revised 2015 Budget - Fund 121
ORD.A
Page 3 of 9
31,371 55,060
55,000 31,431
Page 35 of 146
1
1
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Cumulative Reserve Fund ( #122)
2015 Adopted Budget
5.582.204
1.314.100
658.000
6.238.304
BA #1 (Ordinance #6558)
BA #2 (Ordinance #6563, Proposed
17,482 1,500,000
1,517,482
Adjust beginning fund balance
17,482
17,482
Transfer funds from General Fund fT /F from F001
Revised 2015 Budget - Fund 122
1.500.000
1.500.000
5,599,686 2,814,100
658,000 7,755,786
1 Mitigation Fees Fund ( #124)
2015 Adopted Budget
5,205,964
994,890
BA #1 (Ordinance #6558)
370.213
400.000
BA #2 (Ordinance #6563, Proposed
(675,666)
3,586,423 2,614,431
370,213 400,000
1,520 (677,186)
Adjust beginning fund balance
675,666
675,666)
Increase budget for cp1308 (BNSF Utility Crossing Project) [T /F to F1021
1,520 (1,520)
Revised 2015 Budget - Fund 124
4,900,511
1,394,890 3,958,156 2,337,245
1 LID Guarantee Fund ( #249)
2015 Adopted Budget
24,549
20
2,000
BA #1 (Ordinance #6558
BA #2 (Ordinance #6563, Proposed):
(2)
Adjust beginning fund balance
(2)
Revised 2015 Budget - Fund 249
24,547
20
2,000
22,569
(2)
(2)
22,567
1 LID 250 Fund ( #250)
2015 Adopted Budget
BA #1 (Ordinance #6558
BA #2 (Ordinance #6563, Proposed):
449
449
Adjust beginning fund balance
449
449
Revised 2015 Budget - Fund 250
ORD.A
Page 4 of 9
449
449
Page 36 of 146
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
LID 350 Fund ( #275)
2015 Adopted Budget
7.864
7.257
7.247
7.874
BA #1 (Ordinance #6558)
BA #2 (Ordinance #6563, Proposed
1,995
1,995
Adjust beginning fund balance
1,995
1,995
Revised 2015 Budget - Fund 275
9,859
7,257
7,247
9,869
Parks Construction Fund ( #321)
2015 Adopted Budget
427,106
BA #1 (Ordinance #6558)
620,130 540,000
58,199 3,742,788 3,815,286
36.000 36.000
BA #2 (Ordinance #6563, Proposed
42.465
507,236
(14,299)
42.465
Increase cp1510 ( Les Gove Park Improvements) t
p
hase synthetic turf
36,000 36,000
Adjust beginning fund balance
Revised 2015 Budget - Fund 321
42,465
42,465
527,770
4,398,918 4,391,286
535,402
1 Capital Improvements Fund ( #328)
2015 Adopted Budget
8,944,989
BA #1 (Ordinance #6558)
1,840,247 2,157,368
763,617 89,383 3,246,266 (2,393,266)
937,662
8,627,868
ORD.A
BA #2 (Ordinance #6563, Proposed
27,709) 1,430,000
464,629
Revise REET projections
1.400.000
1.400.000
T/F from REET2 for cp11506 (Pavement Patching) [T /F to F105]
Restore previously budgeted funding for cp1503 (Traffic Signal Improvements)
30,000
Carry forward budget for cp1226 (8th St. NE & C St. NW ITS Improvements) 39,890
Carry forward budget for cp1301 (Citywide Sidewalk Repair Project) 122,493
Carry forward budget for cp1322 (Annual Traffic Signal Improvements) 145,279
600,000 (600,000)
30,000
39,890
122,493
145,279
Adjust beginning fund balance
Revised 2015 Budget - Fund 328
335,371
335,371)
Page 5 of 9
9,680,897 3,359,630
6,341,296 6,699,232
Page 37 of 146
1
1
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Local Revitalization Fund (#330)
2015 Adopted Budget
229 370
250
BA#1 (Ordinance #6558)
329,450
BA#2 (Ordinance #6563, Proposed
(881
229,620
329,450
(881
Adjust beginning fund balance
(881)
(881)
Revised 2015 Budget - Fund 330
557,939
250 558,189
Water Fund (#430)
2015 Adopted Budget
4,526,763
19,158,319
BA#1 (Ordinance #6558)
8 855 102
BA#2 (Ordinance #6563, Proposed
645 540
18,310,129 5,374,953
8,855,102
5 422 640 118
Reallocate budget to reflect vacant Finance position moving to CDPW
5,422 (5,422)
Adjust beginning fund balance
Revised 2015 Budget - Fund 430
645,540
645 540
14,027,405
19,158,319 27,170,654 6,015,071
1 Sewer Fund (#431)
2015 Adopted Budget
10,794,820
7,985,084
BA#1 (Ordinance #6558)
1,819,579
BA#2 (Ordinance #6563, Proposed
731,883
9,954,201 8,825,703
1,819,579
5,422 726,461
Reallocate budget to reflect vacant Finance position moving to CDPW
Adjust beginning fund balance
5,422 5,422)
731,883 731,883
Revised 2015 Budget - Fund 431
13,346,282 7,985,084
11,779,203 9,552,163
1 Storm Drainage Fund (#432)
2015 Adopted Budget
BA#1 (Ordinance #6558
BA#2 (Ordinance #6563, Proposed):
10,674,042 10,141,339 13,034,095 7,781,286
4,364,190 932,890 5,871,819 (574,739)
1,012,848 10,845 1,002,003
Reallocate budget to reflect vacant Finance position moving to CDPW
10,845 (10,845)
Adjust beginning fund balance
1 012 848
1 012 848
Revised 2015 Budget - Fund 432
ORD.A
Page 6 of 9
16,051,080
11,074,229 18,916,760 8,208,549
Page 38 of 146
1
1
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Sewer Metro Sub Fund (#433)
2015 Adopted Budget
2 447 311
16 101 737
16 056 900
2 492 148
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
346,911
346,911)
Adjust beginning fund balance
(346,911)
(346,911)
Revised 2015 Budget - Fund 433
2,100,400 16,101,737
16,056,900 2,145,237
Solid Waste Fund (#434)
2015 Adopted Budget
2,272,081
13,347,800
BA#1 (Ordinance #6558)
1,250
BA#2 (Ordinance #6563, Proposed
218 393
12,761,420
1,250
(5,423)
2,858,461
223 816
Reallocate budget to reflect vacant Finance position moving to CDPW
(5,423)
5 423
Adjust beginning fund balance
Revised 2015 Budget - Fund 434
218,393
218 393
2,491,724 13,347,800
12,757,247 3,082,277
1 Airport Fund (#435)
2015 Adopted Budget
682,748
1,060,369
1,451,008
BA#1 (Ordinance #6558)
65,729
100 221
192,684
BA#2 (Ordinance #6563, Proposed
8,461
292,109
(26,734)
8 461
Adjust beginning fund balance
Revised 2015 Budget - Fund 435
8 461
8 461
756,938
1,160,590 1,643,692
273,835
1 Cemetery Fund (#436)
2015 Adopted Budget
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
126,755 1,078,300 1,048,607 156,448
167,792 30,000 36,572 161,220
Adjust wages for non-benefitted part-time maintenance workers
Fund construction of columbarium (niche) wall (T/F from F701]
Reallocate budget to reflect vacant Finance position moving to CDPW
Adjust beginning fund balance
Revised 2015 Budget - Fund 436
ORD.A
8,740 (8,740)
30,000 30,000
(2,168) 2,168
167,792 167,792
Page 7 of 9
294,547 1,108,300 1,085,179 317,668
Page 39 of 146
1
1
1
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Insurance Fund (#501)
2015 Adopted Budget
1,613,131
1,000
218,900
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
40,926
Adjust beginning fund balance
40,926
Revised 2015 Budget - Fund 501
1,654,056
1,000
218,900
1,395,231
40,926
40,926
1,436,156
Workers Comp Fund (#503)
2015 Adopted Budget
123,000
860,100
816,601
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
317,004
Adjust beginning fund balance
317,004
Revised 2015 Budget - Fund 503
440,004
860,100
816,601
166,499
317,004
317,004
483,503
Facilities Fund (#505)
2015 Adopted Budget
1,546,227
3,638,820
BA#1 (Ordinance #6558)
213,800
BA#2 (Ordinance #6563, Proposed
648,685
3,838,569 1,346,478
243,800 (30,000)
300,000 348,685
Adjust beginning fund balance
648,685
Move 2016 budget forward to 2015 for CH At
Revised 2015 Budget - Fund 505
m Repair Project FAC.0011
648,685
300,000 (300,000)
2,408,712 3,638,820 4,382,369 1,665,163
1 Innovation & Technology Fund (#518)
2015 Adopted Budget
BA#1 (Ordinance #6558)
BA#2 (Ordinance #6563, Proposed
Adjust beginning fund balance
Revised 2015 Budget - Fund 518
ORD.A
Page 8 of 9
2,363,378 5,660,747 6,195,259 1,828,866
785,266 70,373
394,683 394,683
394,683 394,683
3,543,327 5,731,120 7,050,898 2,223,549
855,639
Page 40 of 146
1
1
1
1
4,236,967 8,799,2011
Schedule A
Summary of 2015 Budget Adjustments by Fund
Budget Amendment #2 (Ordinance #6563)
Beg. Fund 2015 2015 Ending Fund
Balance Revenues Expenditures Balance
Equipment Rental Fund ( #550)
2015 Adopted Budget
4.324.274
4.210.470
BA #1 (Ordinance #6558)
713,953
70,000
BA #2 (Ordinance #6563, Proposed
806,463
5,349,861 3,184,883
1,055,216 (271,263)
43,602 762,861
Reallocate budget to reflect vacant Finance position moving to CDPW
Move rplcmnt budget for Asset P020C (Ford Crown Victoria) from 2016 to 2015
Adjust beginning fund balance
806,463
(2,168) 2,168
45,770 (45,770)
806,463
Revised 2015 Budget - Fund 550
5,844,690
4,280,470 6,448,679 3,676,481
1 Fire Pension Fund ( #611)
2015 Adopted Budget
2.580.481
76.000
170.181
BA #1 (Ordinance #6558)
BA #2 (Ordinance #6563, Proposed
28,981
Adjust beginning fund balance
28,981
Revised 2015 Budget - Fund 611
2,609,462
76,000
2,486,300
28,981
28,981
170,181 2,515,281
1 Cemetery Endowment Fund ( #701)
2015 Adopted Budget
1,663,664
34,200
1,697,864
BA #1 (Ordinance #6558
BA #2 (Ordinance #6563, Proposed):
5,984
30,000
(24,016)
Fund construction of columbarium (niche) wall [T /F to F436]
30,000 (30,000)
Adjust beginning fund balance
5,984
5,984
Revised 2015 Budget - Fund 701
1,669,648
34,200
30,000 1,673,848
Grand Total - All Funds
2015 Adopted Budget
84,534,959
168,599,228
182,194,484 70,939,703
BA #1 (Ordinance #6558)
22, 992, 902 11,197, 615
36,847,118 (2,656,601)
1 TOTAL BA #2 (Ordinance #6563)
9,196,208 3,839,960
Revised 2015 Budget
ORD.A
Page 9 of 9
116,724,069 183,636,803 223,278,568 77,082,303
300,360,871
Page 41 of 146
300,360,871
Schedule B
2015 Appropriations by Fund
2015 BA#1 BA #2 2015
Adopted Total Revised
Budget (Ord #6558) (Ord #6563) Amendments Budget
General Fund ( #001)
73,360,404
507,174
4,314,954
4,822,129
78,182,533
Arterial Street Fund ( #102)
15,463,434
6,508,221
738,892
7,247,114
22,710,548
Local Street Fund ( #103)
2,948,568
770,053
76,856
846,909
3,795,477
Hotel Motel Fund ( #104)
234,031
-
26,905
26,905
260,936
Arterial Street Preservation Fund ( #105)
2,656,610
2,659,063
802,347
3,461,410
6,118,020
Drug Forfeiture Fund ( #117)
602,505
-
34,416
34,416
636,921
Housing and Community Development Grant Fund ( #119)
477,371
-
17,533
17,533
494,904
Recreation Trails Fund ( #120)
43,847
-
(761)
(761)
43,086
Business Improvement Area Fund ( #121)
96,272
-
(9,841)
(9,841)
86,431
Cumulative Reserve Fund ( #122)
6,896,304
-
1,517,482
1,517,482
8,413,786
Mitigation Fees Fund ( #124)
6,200,854
770,213
(675,666)
94,547
6,295,401
1998 Library Fund ( #229)
279,500
-
-
-
279,500
2010 Annex A &B Bond Debt Fund ( #230)
1,695,917
-
-
-
1,695,917
2010 C &D Local Revitalization Debt Fund ( #231)
594,637
-
-
-
594,637
LID Guarantee Fund ( #249)
24,569
-
(2)
(2)
24,567
LID #250 ( #250)
-
-
449
449
449
LID #350( #275)
15,121
-
1,995
1,995
17,116
Golf Course Debt Service Fund (#237)
389,195
-
-
-
389,195
Municipal Park Construction Fund ( #321)
1,047,236
3,800,987
78,465
3,879,452
4,926,688
Capital Improvements Fund ( #328)
10,785,236
853,000
1,402,291
2,255,292
13,040,528
Local Revitalization Fund (#330)
229,620
329,450
(881)
328,569
558,189
Golf Course Debt Service Fund (#417)
-
-
-
-
-
Water Fund (#430)
23,685,082
8,855,102
645,540
9,500,643
33,185,724
Sewer Fund (#431)
18,779,904
1,819,579
731,883
2,551,462
21,331,366
Storm Drainage Fund (#432)
20,815,381
5,297,080
1,012,848
6,309,928
27,125,309
Sewer Metro Fund (#433)
18,549,048
-
(346,911)
(346,911)
18,202,137
Solid Waste Fund (#434)
15,619,881
1,250
218,393
219,643
15,839,524
Airport Fund (#435)
1,743,117
165,950
8,461
174,411
1,917,528
Cemetery Fund (#436)
1,205,055
-
197,792
197,792
1,402,847
Golf Course Fund (#437)
-
-
-
-
-
Insurance Fund ( #501)
1,614,131
-
40,926
40,926
1,655,056
Workers Compensation Self Insurance Fund (#503)
983,100
-
317,004
317,004
1,300,104
Facilities Fund ( #505)
5,185,047
213,800
648,685
862,485
6,047,532
Innovation and Technology Fund ( #518)
8,024,125
855,639
394,683
1,250,322
9,274,447
Equipment Rental Fund (#550)
8,534,744
783,953
806,463
1,590,416
10,125,160
Fire Pension Fund (#611)
2,656,481
-
28,981
28,981
2,685,462
Cemetery Endowment Fund ( #701)
1,697,864
-
5,984
5,984
1,703,848
34,190,517
13,IIF$
41,
300,360,8ri
ORD.A
Page 42 of 146
AuBuRN ITY OF �
\VASH E NGTo
AGENDA BILL APPROVAL FORM
Agenda Subject: Date:
Resolution No. 5146 June 8, 2015
Department: Attachments: Budget Impact:
CD &PW Res5146 $0
Final TI P
Administrative Recommendation:
City Council adopt Resolution No. 5146.
Background Summary:
The purpose of this Resolution is for the City Council to adopt the 2016 -2021
Transportation Improvement Program.
Pursuant to RCW 35.77.010 the City of Auburn is required to annually prepare and
adopt a comprehensive Transportation Improvement Program (TIP) for each ensuing
six calendar years. The TIP is the detailed programming document for transportation
improvements over a six year period. The plan is intended to ensure that the City will
have available advance plans as a guide in carrying out a coordinated street
construction program.
Reviewed by Council Committees:
Councilmember:
Meeting Date: June 15, 2015
RES.A
Staff: Snyder
Item Number: RES.A
AUBURN * MORE THAN YOU IMAGINED Page 43 of 146
RESOLUTION NO. 5 1 4 6
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE 2016 -2021
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF
AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF THE LAWS
OF THE STATE OF WASHINGTON
WHEREAS, RCW 35.77.010 requires that the legislative body of each City
prepare and adopt a comprehensive Transportation Improvement Program (TIP)
for the ensuing six years, but only after conducting a public hearing; and
WHEREAS, a public hearing to review the 2016 -2021 Transportation
Improvement Program for the City of Auburn was held on June 15, 2015 at the
hour of 7:00 p.m. in the Council Chambers of the Auburn City Hall, pursuant to
notice published in the legal newspaper of the City of Auburn on June 03, 2015.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the
terms of which are incorporated herewith by reference as though fully set forth, a
designation of the streets within the corporate limits of the City of Auburn to be
improved in the manner therein set forth during the year set for the improvement
of such street or streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed
to forward a certified copy of this Resolution to the Washington State Department
of Transportation for filing not more than thirty (30) days after the adoption of this
Resolution.
Section 3. That the Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of this
legislation.
Section 4. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
Resolution No. 5146
June 8, 2015
Page 1
RES.A Page 44 of 146
DATED this day of June, 2015
ATTEST:
Danielle E. Daskam,
City Clerk
APP e,VED AS TO FORM:
aniel B. Heid,
City Attorney
Resolution No. 5146
June 8, 2015
Page 2
CITY OF AUBURN
NANCY BACKUS
MAYOR
RES.A Page 45 of 146
AUBURN
�O�THAN you, gqqGINE0
2016 -2021
Transportation Improvement
Program
Community Development and Public
Works Department
Transportation Section
Adopted June 15, 2015
RES.A Page 46 of 146
City of Auburn Transportation Improvement Program
AUBURN
tloolIRAN YOU IM1
Transportation Improvement
Program
2016 -2021
Adopted by Auburn City Council
June 15, 2015
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)- 931 -3010
www.auburnwa.gov
RES.A Page 47 of 146
City of Auburn Transportation Improvement Program
IRAN- YOU NAG I
Cover Photos: Left: 24th St SE Reconstruction, Right: Auburn Way South & M St SE
ii
RES.A
Page 48 of 146
City of Auburn Transportation Improvement Program
RESOLUTION NO. 5146
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE 2016 -2021
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF
AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF THE LAWS
OF THE STATE OF WASHINGTON
WHEREAS, RCW 35.77.010 requires that the legislative body of each City
prepare and adopt a comprehensive Transportation Improvement Program (TIP)
for the ensuing six years, but only after conducting a public hearing; and
WHEREAS, a public hearing to review the 2016 -2021 Transportation
Improvement Program for the City of Auburn was held on June 15, 2015 at the
hour of 7:00 p.m. in the Council Chambers of the Auburn City Hall, pursuant to
notice published in the legal newspaper of the City of Auburn on June 03, 2015.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the
terms of which are incorporated herewith by reference as though fully set forth, a
designation of the streets within the corporate limits of the City of Auburn to be
improved in the manner therein set forth during the year set for the improvement
of such street or streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed
to forward a certified copy of this Resolution to the Washington State Department
of Transportation for filing not more than thirty (30) days after the adoption of this
Resolution.
Section 3. That the Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of this
legislation.
Section 4. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
iii
RES.A Page 49 of 146
City of Auburn Transportation Improvement Program
DATED this day of June, 2015
CITY OF AUBURN
NANCY BACKUS
MAYOR
ATTEST:
Danielle E. Daskam,
City Clerk
APPROVED AS TO FORM:
Daniel B. Heid,
City Attorney
iv RES.A
Page 50 of 146
City of Auburn Transportation Improvement Program
Table of Contents
Executive Summary 1
Introduction 1
Projects & Financing Plan Summary 3
Financial Constraint & Fund Balance Summary 13
Roadway Improvement Projects 15
AWS Ped Improvements (TIP# 2) 15
Auburn Way Corridor (TIP# 3) 16
1 Street NE Corridor (TIP# 4) 17
M Street Underpass (TIP# 5) 18
S 272nd/277th Street (TIP# 6) 19
A St NW, Phase 2 (TIP# 8) 20
AWS, Hemlock to Academy (TIP# 9) 21
F Street SE (TIP# 10) 22
M Street NE (TIP# 11) 23
Grade - Separated Crossing of BNSF Yard (TIP# 12) 24
8th Street NE Widening (TIP# 15) 25
49th Street NE (TIP# 16) 26
46th PI S Realignment (TIP# 25) 27
Neighborhood Traffic Calming Program(TIP# 33) 28
124th Ave SE Corridor Improvements, Phase 2 (TIP# 40) 29
R Street Bypass (TIP# 41) 30
SE 320th Street Corridor Improvements (TIP# 42) 31
AWS (SR -164) Corridor Safety Improvements (TIP# 43) 32
West Valley Highway Improvements (15th NW to W Main St) (TIP# 49) 33
West Main St Corridor Improvements (TIP# 55) 34
AWS Corridor Improvements (Fir to Hemlock) (TIP# 58) 35
M Street SE Corridor (TIP# 60) 36
AWS Bypass (TIP# 61) 37
AWS Streetscape Improvements (TIP# 62) 38
Lea Hill Rd Segment 1 (TIP# 64) 39
Lea Hill Rd Segment 2 (TIP# 65) 40
Lea Hill Rd Segment 3 (TIP# 66) 41
West Valley Highway Improvements (SR -18 to 15th SW) (TIP# 72) 42
Stewart Road (Lake Tapps Parkway) (TIP# 73) 43
R St SE Corridor Extension (TIP# 74) 44
Intersection Signal & ITS Improvements 45
M Street SE /12th Street SE Traffic Signal (TIP# 14) 45
Harvey Rd NE /8th St NE Intersection Improvements (TIP# 17) 46
M St SE & 29th St SE Intersection Safety Improvements (TIP# 18) 47
Auburn Way North /1st Street NE Signal Improvements (TIP# 19) 48
R St SE & 21st St SE Intersection Safety Improvements (TIP# 20) 49
Main Street Signal Upgrades (TIP# 21) 50
Traffic Signal Improvements (TIP# 34) 51
RES.A Page 51 of 146
City of Auburn Transportation Improvement Program
C St SW & 15th St SW Intersection (TIP# 38) 52
124th Ave SE & Se 320th St Intersection Improvements (TIP# 39) 53
Traffic Management Center Improvements (TIP# 47) 54
A St SE & 6th St SE Safety & Access Improvements (TIP# 48) 55
124th Ave SE & SE 284th St Intersection Safety (TIP# 45) 56
ITS Dynamic Message Signs (TIP# 50) 57
Lake Tapps Parkway ITS Expansion (TIP# 51) 58
A St SE & Lakeland Hills Way Intersection (TIP# 52) 59
AWS /12th Street SE Intersection Improvements (TIP# 53) 60
Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements (TIP# 59) 61
29th St SE /R St SE Intersection Improvements (TIP# 63) 62
Traffic Signal Safety Improvements (TIP# 67) 63
37th Street & A St SE Traffic Signal Safety Improvement (TIP# 68) 64
I St NE & 22nd St NE Roundabout Safety Improvement (TIP# 69) 65
Non - Motorized & Transit Improvements 67
Riverwalk Drive SE Non - Motorized Improvements (TIP# 23) 67
Academy Drive Multi -Use Trail (TIP# 24) 68
Metro Shuttle (TIP# 26) 69
Citywide Pedestrian Accessibility Program (TIP# 30) 70
Citywide Arterial Bicycle and Safety Improvements (TIP# 31) 71
Citywide Sidewalk Repair and Improvements (TIP# 32) 72
Downtown Transit Access Improvements (TIP# 44) 73
Evergreen Heights Safe Routes to School Improvements (TIP# 56) 74
Preliminary Engineering & Miscellaneous Projects 76
A Street NW, Phase 1 (TIP# 1) 76
Mohawk Plastics Site Mitigation (TIP# 13) 77
A Street SE Safety Improvements Study (TIP# 27) 78
S 277th St - Wetland Mitigation (TIP# 29) 79
104th Ave SE & Green River Road Study (TIP# 46) 80
Kersey Way SE Corridor Study (TIP# 54) 81
Pavement Preservation Projects 83
15th St SW Reconstruction (TIP# 7) 83
Lake Tapps Parkway Preservation (TIP #22) 84
Annual Bridge Structure Preservation (TIP# 28) 85
Arterial Preservation Program (TIP# 35) 86
Arterial Crack Seal Program (TIP# 36) 87
Local Street Improvement Program (TIP# 37) 88
Arterial Bridge Deck Rehabilitation (TIP# 57) 89
Auburn Way North Preservation (TIP# 70) 90
15th St NW /NE Preservation (TIP# 71) 91
Project Summary Sheet Appendix A
2016 -2021 TIP Project Map Appendix B
vi RES.A
Page 52 of 146
City of Auburn Transportation Improvement Program
EXECUTIVE SUMMARY
The Transportation Improvement Program (TIP) is a 6 -year plan for transportation
improvements that support the City of Auburns current and future growth. The TIP along with
the Comprehensive Transportation Plan (CTP) serve as source documents for the City of
Auburn Capital Facilities Plan which is a Comprehensive Plan element required by
Washington's Growth Management Act. The program may be revised at any time by a majority
of the City Council after a public hearing.
INTRODUCTION
Purpose
The purpose of the TIP is to identify priority transportation projects and assure that the city has
advanced plans as a guide in carrying out a coordinated transportation program. There are
always more projects than available revenues. Therefore, a primary objective of the TIP is to
integrate the two to produce a comprehensive, realistic program for the orderly development
and maintenance of our street system. Projects are required to be included in the TIP in order
to be eligible for state and federal grants. Grant funding for projects listed may not yet be
secured.
Statutory Requirements
Six Year Transportation Improvement Program - RCW 35.77.010 requires that each city
prepare and adopt a comprehensive transportation improvement program for the ensuing six
calendar years consistent with its CTP. This six -year TIP shall be filed with the Secretary of the
Washington State Department of Transportation (WSDOT) each year within 30 days of
adoption.
Projects of Regional Significance - RCW 35.77.010 also requires each city to specifically set
forth those projects and programs of regional significance for inclusion in the transportation
improvement program for that region. The 2016 -2021 TIP includes five projects of regional
significance:
TIP Project Number
Project Title
TIP# 6
S 272nd/277th Street Corridor
TIP# 49
West Valley Highway (15th NW to W Main St)
TIP# 58
AWS Corridor Improvements (Fir to Hemlock)
TIP# 61
SR -18 to Auburn Way South (SR -164) Bypass
TIP# 71
West Valley Highway (W Main St to 15th St SW)
RES.A
Executive Summary & Introduction
1
Page 53 of 146
City of Auburn Transportation Improvement Program
Methodology
Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable
estimate of funding available to accomplish the transportation improvement needs. Since the
desire to construct transportation improvements typically exceeds the available forecast
revenue, it is necessary to establish some method of prioritizing the needs.
Transportation needs are identified by examining the latest information concerning level of
service, safety and accident history, growth trends, traffic studies and the City's adopted CTP.
The likelihood of receiving federal or state grants for various improvements, community
interests and values are also considered. All of these factors yield a prioritized list of
transportation improvements.
Projects are placed into one of the following categories;
• Roadway Improvements,
• Intersection, Signal & Intelligent Transportation System Improvements,
• Non - Motorized & Transit Improvements,
• Preliminary Engineering & Miscellaneous Projects, and
• Roadway Preservation Projects.
Each project is identified as a Capacity or Non - capacity improvement and those that lay within
the limits of a defined Arterial LOS Corridor per with Table 2 -2 of the City's CTP are identified
accordingly. Capacity projects from the 6 -year plan are incorporated into the CTP as Group A
projects. Longer term capacity projects are listed in the CPT as Group B Projects.
Detailed project costs and funding sources are identified and provided for each project listed in
the proposed TIP. The prioritized list is then financially constrained in the first three years to
reflect the financial projections to yield the six -year Transportation Improvement Program. After
completing all reviews and compiling the document, staff makes final recommendations to the
Planning and Community Development Committee and City Council for approval.
2 RES.A
Executive Summary & Introduction
Page 54 of 146
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary
TI p# Roadway Projects 2016 2017 2018 2019 2020 2021 Total
2 Auburn Way S Pedestrian Improvements (Dogwood St SE to Fir St SE)
Capital Costs 5,000 - - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - - 5,000
Secured Fed & State Grants - - - - -
Traffic Impact Fees - - - -
Other (MuckleShoot Tribe) - - - -
3 Auburn Way Corridor (4th St NE to 4th St SE)
Capital Costs - - 818,700 3,000,000 - 3,818,700
Funding Sources:
Unrestricted Street Revenue - - 110,000 600,000 - 710,000
Unsecured Grant - - 708,700 2,400,000 - 3,108,700
Traffic Impact Fees - - - - -
4 I Street NE Corridor (45th St NE to S 277th St)
Capital Costs - - 6,760,000 - - 6,760,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - - -
Other (Development) - - 6,760,000 - - 6,760,000
5 M Street Underpass (3rd St SE to 8th St SE)
Capital Costs 130,654 130,080 129,500 128,920 128,350 128,000 775,504
Funding Sources:
Unrestricted Street Revenue - -
Secured State Grant - - -
Traffic Impact Fees 130,654 130,080 129,500 128,920 128,350 128,000 775,504
Traffic Mitigation Fees - - -
PWTFL - -
Other (Agencies) - -
6 S 272nd/277th Street Corridor
Capital Costs 6,881,800 - - - 6,881,800
Funding Sources:
Unrestricted Street Revenue - - - - -
Secured Fed & State Grants 4,000,000 - - - 4,000,000
Traffic Impact Fees 581,800 - - - 581,800
Other (Development) 2,300,000 - - - 2,300,000
8 A Street NW, Phase 2
Capital Costs: - - 3,000,000 3,000,000
Funding Sources:
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - - 3,000,000 3,000,000
9 Auburn Way S (Hemlock to Academy)
Capital Costs: 200,000 - - - 200,000
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant - -
Traffic Impact Fees 100,000 100,000
Other (MIT) 100,000 - - - 100,000
10 F Street SE Non - Motorized Improvements
Capital Costs 250,000 1,800,000 - 2,050,000
Funding Sources:
Unrestricted Street Revenue 160,000 - 160,000
Secured Grant 200,000 - - 200,000
Traffic Impact Fees 50,000 200,000 - 250,000
Unsecured Grant 1,440,000 - 1,440,000
RES.A
Projects & Financing Plan Summary
3
Page 55 of 146
City of Auburn Transportation Improvement Program
TIP# Roadway Projects 2016 2017 2018 2019 2020 2021 Total
11 M Street NE (E Main St to 4th St NE)
Capital Costs - 100,000 275,000 1,150,000 1,525,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant - 220,000 920,000 1,140,000
Traffic Impact Fees - 100,000 55,000 230,000 385,000
12 Grade - Separated Crossing of BNSF Railvard
Capital Costs - - - 1,125,000 1,125,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - -
Other (Development) - - - 1,125,000 1,125,000
15 8th Street NE Widening (Pike St to R St NE)
Capital Costs - 450,000 1,000,000 1,450,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant - 360,000 800,000 1,160,000
Traffic Impact Fees - 90,000 200,000 290,000
16 49th Street NE (Auburn Way N to I St NE)
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees
Other (Development)
850,000 2,500,000 - 3,350,000
850,000 2,500,000 - 3,350,000
25 46th Place S Realignment
Capital Costs - - 825,000 825,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant - - 575,000 575,000
Traffic Impact Fees - - 250,000 250,000
Other - - -
33 Neighborhood Traffic Calming Improvements
Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Funding Sources:
Cap. Imp. Fund Balance - - - -
Unsecured Grant - - - - -
REET 2 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Other - - - - -
40 124th Avenue SE Corridor Improvements (SE 312th to SE 318th)
Capital Costs - 400,000 1,100,000 2,500,000 - 4,000,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - 300,000 880,000 2,000,000 - 3,180,000
Traffic Impact Fees - 100,000 220,000 500,000 - 820,000
41 R Street Bypass
Capital Costs - - - 500,000 500,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - -
Other (Development) - - - 500,000 500,000
42 SE 320th Street Corridor Improvements (116th Ave SE to 122nd Ave SE)
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees
100,000
100,000
600,000 662,500 3,281,600
4,644,100
100,000
480,000 530,000 2,953,440 3,963,440
120,000 132,500 328,160 580,660
4 RES.A
Projects & Financing Plan Summary
Page 56 of 146
City of Auburn Transportation Improvement Program
TI p# Roadway Projects 2016 2017 2018 2019 2020 2021 Total
43 Auburn Wav S (SR -164) Corridor Safety Improvements (Muckleshoot Plaza to Dogwood)
Capital Costs 2,347,665 - - 2,347,665
Funding Sources:
Unrestricted Street Revenue - - -
Secured Federal Grant 1,951,313 - - 1,951,313
Traffic Impact Fees 89,678 - - 89,678
Other (WSDOT) 306,674 - - 306,674
49 W Valley Highway Improvements (15th Street NW to W Main Street)
Capital Costs - - 100,000 600,000 3,000,000 - 3,700,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - - 480,000 2,400,000 - 2,880,000
Traffic Impact Fees - 100,000 120,000 600,000 - 820,000
55 W Main St Multimodal Corridor and ITS Improvements (WVH to Interurban Trail)
Capital Costs 3,494,400 - - 3,494,400
Funding Sources:
Unrestricted Street Revenue - - -
Secured Grant 2,970,240 - - 2,970,240
Traffic Impact Fees 209,650 - - 209,650
Other (Arterial Preserv. Fund) 314,510 - - 314,510
58 Auburn Wav S Corridor Improvements (Fir to Hemlock)
Capital Costs 5,000 - - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - - 5,000
Secured State Grant - - - -
Traffic Impact Fees - - - -
Other (MIT) - - - -
60 M Street SE Corridor (8th St SE to AWS)
Capital Costs - 1,925,000 4,750,000 - 6,675,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - 925,000 3,750,000 - 4,675,000
Traffic Impact Fees - 750,000 750,000 - 1,500,000
Other (Development) - 250,000 250,000 - 500,000
61 Auburn Way S Bypass
Capital Costs - - 5,000,000 10,000,000 15,000,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - - -
Other (WSDOT) - - 1,500,000 3,500,000 5,000,000
Other (Development) - - 3,500,000 6,500,000 10,000,000
62 Auburn Wav S Streetscape Improvements (SR -18 to M St SE)
Capital Costs -
Funding Sources:
Unrestricted Street Revenue -
Unsecured Grant -
Traffic Impact Fees -
Other -
1,950,000
200,000
1,750,000
2,800,000 4,750,000
200,000
2,600,000
400,000
4,350,000
64 Lea Hill Road Segment 1 (R St NE to 105th PI SE)
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees
100,000
100,000
2,450,000 10,000,000 - 12,550,000
1,950,000 8,000,000 - 9,950,000
500,000 2,000,000 - 2,600,000
RES.A
Projects & Financing Plan Summary
5
Page 57 of 146
City of Auburn Transportation Improvement Program
TI p# Roadway Projects 2016 2017 2018 2019 2020 2021 Total
65 Lea Hill Road Segment 2 (105th PI SE to 112th Ave SE)
Capital Costs - - 3,500,000 8,500,000 12,000,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - - 2,900,000 7,100,000 10,000,000
Traffic Impact Fees - - 600,000 1,400,000 2,000,000
66 Lea Hill Road Segment 3 (112th Ave SE to 124th Ave SE)
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees
1,000,000
1,000,000
3,000,000 4,000,000
3,000,000
3,000,000
1,000,000
72 W Valley Highway Improvements (SR -18 to 15th St SW)
Capital Costs - 100,000 500,000 2,500,000 - - 3,100,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - 400,000 2,000,000 - - 2,400,000
Traffic Impact Fees - 100,000 100,000 500,000 - - 700,000
73 Stewart Road. Lake Tapps Parkway Corridor
Capital Costs 100,000 - 100,000
Funding Sources:
Unrestricted Street Revenue 66,000 - 66,000
Unsecured Grant - - -
Traffic Impact Fees - - -
Traffic Mitigation Fees 34,000 - 34,000
74 R St SE Corridor Extension
Capital Costs - - 2,000,000 8,000,000 10,000,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - -
Other (Development) - - 2,000,000 8,000,000 10,000,000
Subtotal, Roadway Projects:
Capital Costs 13,614,519 2,230,080 2,379,500 22,120,120 50,534,950 28,353,000 119,232,169
Funding Sources
Unrestricted Street Revenue 110,000 226,000 - 310,000 800,000 - 1,446,000
Grants 9,121,553 1,440,000 1,540,000 10,243,700 31,498,440 7,100,000 60,943,693
Traffic Impact Fees 1,261,782 430,080 739,500 3,606,420 5,386,510 1,528,000 12,952,292
Traffic Mitigation Fees - 34,000 - - - 34,000
REET 2 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Other (WSDOT) 306,674 - - 1,500,000 3,500,000 5,306,674
Other (Development) 2,300,000 - 7,860,000 11,250,000 16,125,000 37,535,000
Other (Muckleshoot Tribe) 100,000 - - - 100,000
Other (Arterial Preserv. Fund) 314,510 - - - 314,510
Total Funding 13,614,519 2,230,080 2,379,500 22,120,120 50,534,950 28,353,000 119,232,169
6 RES.A
Projects & Financing Plan Summary
Page 58 of 146
City of Auburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects 2016 2017 2018 2019 2020 2021 Total
14 M Street SE & 12th Street SE Traffic Signal
Capital Costs - 625,000 625,000
Funding Sources:
Unrestricted Street Revenue - -
Unsecured Grant - 500,000 500,000
Traffic Impact Fees - -
Other (Development) - 125,000 125,000
17 Harvey Road & 8th Street NE Intersection Improvements
Capital Costs 85,383 85,200
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees 85,383 85,200
84,800
84,400 84,400
84,800 84,400
84,200 508,383
84,400 84,200 508,383
18 M Street SE & 29th Street SE Intersection Improvements
Capital Costs 50,000 - 400,000 450,000
Funding Sources:
Unrestricted Street Revenue 50,000 - 100,000 150,000
Unsecured Grant - 300,000 300,000
Traffic Impact Fees - - -
Other - -
19 Auburn Wav N & 1st Street NE Signal Improvements
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Unsecured Grant
Traffic Impact Fees
50,000 550,000 - - 600,000
50,000 125,000 - - 175,000
- 425,000 - - 425,000
20 R Street SE & 21st Street SE Intersection Improvements
Capital Costs 75,000 - 800,000 875,000
Funding Sources:
Unrestricted Street Revenue 75,000 - 100,000 175,000
Secured State Grant - 700,000 700,000
Traffic Impact Fees - - -
Traffic Mitigation Fees - -
21 Main Street Signal Upgrades
Capital Costs 5,000 - - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - - 5,000
Unsecured Grant - - - -
Traffic Impact Fees - - - -
Traffic Mitigation Fees - - - -
34 Traffic Signal Improvements
Capital Costs
Funding Sources:
Cap. Imp. Fund Balance
Unsecured Grant
REET2
175,000
175,000
175,000 175,000
175,000
175,000 175,000
175,000 1,050,000
175,000 175,000 175,000 175,000
1,050,000
38 C Street SW & 15th Street SW Intersection Improvments
Capital Costs - 150,000 - 875,000 - - 1,025,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - - 750,000 - - 750,000
Traffic Impact Fees - 150,000 - 125,000 - - 275,000
RES.A
Projects & Financing Plan Summary
7
Page 59 of 146
City of Auburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects 2016 2017 2018 2019 2020 2021 Total
39 124th Avenue SE & SE 320th Street Intersection Improvements
Capital Costs 350,000 - 1,500,000 - - 1,850,000
Funding Sources:
Unrestricted Street Revenue 175,000 - 150,000 - - 325,000
Unsecured Grant - - 1,200,000 - - 1,200,000
Traffic Impact Fees - - - - -
Other (GRC) 175,000 - 150,000 - - 325,000
45 124th Avenue SE & SE 284th Street Intersection Safety Improvements
Capital Costs - 100,000 600,000 - - 700,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - 450,000 - - 450,000
Traffic Impact Fees - 100,000 150,000 - - 250,000
47 Traffic Management Center Improvements
Capital Costs 25,000 - - 25,000
Funding Sources:
Unrestricted Street Revenue - -
Unsecured Grant - - -
Traffic Impact Fees 25,000 - - 25,000
48 A Street SE & 6th Street SE Safety & Access Improvements
Capital Costs 50,000 - - - 50,000
Funding Sources:
Unrestricted Street Revenue - - - -
Unsecured Grant - - - -
Traffic Impact Fees - - - -
Other (BNSF) 50,000 - - - 50,000
50 ITS Dynamic Message Signs
Capital Costs 150,000 150,000 150,000 150,000 150,000 750,000
Funding Sources:
Cap. Imp. Fund Balance - - -
Unsecured Grant 120,000 120,000 120,000 120,000 480,000
REET 2 100,000 30,000 30,000 30,000 30,000 220,000
Other (WRA) 50,000 - - 50,000
51 E Valley Highway ITS Expansion
Capital Costs 105,000 900,000 - - - 1,005,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant 82,950 711,000 - - - 793,950
Traffic Impact Fees 22,050 189,000 - - - 211,050
52 A Street SE & Lakeland Hills Wav SE Intersection Safety & Capacity Improvements
Capital Costs 75,000 - - 75,000
Funding Sources:
Unrestricted Street Revenue - -
Unsecured Grant - - -
Traffic Impact Fees 75,000 - - 75,000
53 Auburn Way S & 12th Street Intersection Improvements
Capital Costs 100,000 750,000 - - - 850,000
Funding Sources:
Unrestricted Street Revenue 100,000 - - - 100,000
Unsecured Grant - 750,000 - - - 750,000
Traffic Impact Fees - - - - -
8 RES.A
Projects & Financing Plan Summary
Page 60 of 146
City of Auburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects 2016 2017 2018 2019 2020 2021 Total
59 Auburn Avenue & 3rd Street NE Pedestrian & Access Improvements
Capital Costs 50,000 300,000 - 350,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant - 250,000 - 250,000
Traffic Impact Fees 50,000 50,000 - 100,000
63 29th Street SE & R Street SE Intersection Improvements
Capital Costs - - 1,800,000 - - 1,800,000
Funding Sources:
Unrestricted Street Revenue - - - - -
Unsecured Grant - - 1,300,000 - - 1,300,000
Traffic Impact Fees - - 500,000 - - 500,000
67 Citywide Traffic Signal Safety Improvement
Capital Costs 412,575 - - 412,575
Funding Sources:
Unrestricted Street Revenue - - -
Secured Federal Grant 412,575 - - 412,575
Traffic Impact Fees - - -
REET2 - -
68 37th Street SE & A Street SE Traffic Signal Safety Improvement
Capital Costs 722,600 - - - 722,600
Funding Sources:
Unrestricted Street Revenue - - - - -
Secured Federal Grant 635,360 - - - 635,360
Traffic Impact Fees - - - -
Arterial Preserv. Fund (105) 87,240 - - - 87,240
69 I Street NE & 22nd Street NE Roundabout Safety Improvement
Capital Costs 50,000 150,000 1,175,000 - 1,375,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant 100,000 940,000 - 1,040,000
Traffic Impact Fees 50,000 50,000 235,000 - 335,000
Subtotal, Intersection, Signal & ITS Projects:
Capital Costs 2,480,558 2,510,200 3,034,800 6,409,400 409,400
259,200 15,103,558
Funding Sources:
Unrestricted Street Revenue 455,000 125,000 350,000 - - 930,000
Grants 1,130,885 1,681,000 2,185,000 4,870,000 120,000 - 9,986,885
Traffic Impact Fees 257,433 624,200 519,800 709,400 84,400 84,200 2,279,433
Traffic Mitigation Fees - - - - - -
REET 2 275,000 205,000 205,000 205,000 205,000 175,000 1,270,000
Arterial Preserv. Fund (105) 87,240 - - - - 87,240
Other (Development) - - 125,000 - - 125,000
Other (Green River College) 175,000 - 150,000 - - 325,000
Other (White River Amp.) 50,000 - - - 50,000
Other (BNSF) 50,000 - - - 50,000
Total Funding 2,480,558 2,510,200 3,034,800 6,409,400 409,400 259,200 15,103,558
RES.A
Projects & Financing Plan Summary
9
Page 61 of 146
City of Auburn Transportation Improvement Program
TIP: Non - Motorized & Transit Projects 2016 2017 2018 2019 2020 2021 Total
23 Riverwalk Drive SE Non - Motorized Improvements
Capital Costs - 100,000 600,000 - - 700,000
Funding Sources:
Unrestricted Street Revenue - 100,000 100,000 - - 200,000
Unsecured Grant - 500,000 - - 500,000
Traffic Impact Fees - - - - -
24 Academy Drive Multi -Use Trail
Capital Costs - - 425,000 425,000 - 850,000
Funding Sources:
Unrestricted Street Revenue - - 42,500 42,500 - 85,000
Unsecured Grant - - 382,500 382,500 - 765,000
Traffic Impact Fees - - - - -
26 METRO Shuttle: Lakeland Hills Shuttle
Capital Costs 240,000 245,000 245,000 250,000 250,000 250,000 1,480,000
Funding Sources:
Unrestricted Street Revenue 240,000 245,000 245,000 250,000 250,000 250,000 1,480,000
Unsecured Grant - - - - -
Traffic Impact Fees - - - -
30 Citywide Pedestrian Accessibility and Safety Program
Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Funding Sources:
Unrestricted Street Revenue 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Unsecured Grant - - - - -
Traffic Impact Fees - - - -
31 Citywide Arterial Bicycle and Safety Improvements
Capital Costs 100,000 100,000 100,000 - 300,000
Funding Sources:
Unrestricted Street Revenue 100,000 100,000 100,000 - 300,000
Unsecured Grant - - - - -
Traffic Impact Fees - - - -
32 Citywide Sidewalk Repairs and Improvements
Capital Costs 325,000 125,000 125,000 125,000 125,000 125,000 950,000
Funding Sources:
Cap. Imp. Fund Balance 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Unsecured Grant 100,000 100,000 100,000 100,000 100,000 100,000 600,000
REET2 200,000 - - - 200,000
44 Downtown Transit Center Access Improvements
Capital Costs - 250,000 - - - 250,000
Funding Sources:
Unrestricted Street Revenue - 50,000 - - - 50,000
Unsecured Grant - 200,000 - - - 200,000
Traffic Impact Fees - - - - - -
56 Evergreen Heights Safe Routes to School Improvements
Capital Costs - - 790,000 563,000 4,620,000 5,973,000
Funding Sources:
Unrestricted Street Revenue - - 118,500 84,500 693,000 896,000
Unsecured Grant - - 671,500 478,500 3,927,000 5,077,000
Traffic Impact Fees - - - - -
Subtotal, Non - Motorized & Transit Proiects:
Capital Costs 765,000 820,000 1,170,000 1,690,000 1,563,000 5,095,000 11,103,000
Funding Sources
Unrestricted Street Revenue 440,000 495,000 545,000 511,000 577,000 1,043,000 3,611,000
Grants 100,000 300,000 600,000 1,154,000 961,000 4,027,000 7,142,000
Traffic Impact Fees - - - - - -
Cap. Imp. Fund Balance 25,000 25,000 25,000 25,000 25,000 25,000 150,000
REET 2 200,000 - - - - - 200,000
Total Funding 765,000 820,000 1,170,000 1,690,000 1,563,000 5,095,000 11,103,000
10 RES.A
Projects & Financing Plan Summary
Page 62 of 146
City of Auburn Transportation Improvement Program
TIP# Pre. Eng. and Misc. Projects 2016 2017 2018 2019 2020 2021 Total
1 A Street NW, Phase 1
Capital Costs 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Funding Sources:
Unrestricted Street Revenue - - - -
Secured Fed & State Grants - - - - -
Traffic Impact Fees 25,000 25,000 25,000 25,000 25,000 25,000 150,000
13 Mohawks Plastics Site Mitigation Protect
Capital Costs 20,000 20,000 65,000 20,000 - - 125,000
Funding Sources:
Unrestricted Cap. Imp. Funds - - - -
Unsecured Grant - - - - -
Traffic Impact Fees 20,000 20,000 65,000 20,000 - - 125,000
27 A Street SE Safety Improvements Study
Capital Costs 5,000 - - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - - 5,000
Unsecured Grant - - - - -
Traffic Impact Fees - - - -
29 S 277th Street, Wetland Mitigation
Capital Costs 5,000 - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - 5,000
Unsecured Grant - - -
Traffic Impact Fees - - -
46 104th Avenue SE & Green River Road Study
Capital Costs 5,000 - - - 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 - - - 5,000
Unsecured Grant - - - - -
Traffic Impact Fees - - - -
54 Kersey Way SE Corridor Study
Capital Costs 50,000 - - 50,000
Funding Sources:
Unrestricted Street Revenue - - -
Unsecured Grant - - -
Traffic Mitigation Fees 50,000 - - 50,000
Subtotal, Pre. Eng. and Misc. Projects:
Capital Costs 110,000 45,000 90,000 45,000 25,000 25,000 340,000
Funding Sources
Unrestricted Street Revenue 15,000 - - - 15,000
Grants - - - -
Traffic Impact Fees 45,000 45,000 90,000 45,000 25,000 25,000 275,000
Traffic Mitigation Fees 50,000 - - - - - 50,000
Total Funding 110,000 45,000 90,000 45,000 25,000 25,000 340,000
RES.A
Projects & Financing Plan Summary
Page 63 of 146
City of Auburn Transportation Improvement Program
TIP# Roadway Preservation Projects 2016 2017 2018 2019 2020 2021 Total
7 15th Street SW Reconstruction
Capital Costs - 375,000 3,000,000 - - 3,375,000
Funding Sources:
Arterial Preservation Fund - 75,000 500,000 - - 575,000
Unsecured Grant - 300,000 2,500,000 - - 2,800,000
Other - - - - -
22 Lake Tapps Parkway Preservation (City Limit to Lakeland Hills Way)
Capital Costs 124,380 828,470
Funding Sources:
Arterial Preservation Fund 26,480
Unsecured Grant 97,900
Other
176,370
652,100
952,850
202,850
750,000
28 Annual Bridge Structure Preservation
Capital Costs
Funding Sources:
Arterial Preservation Fund
Unsecured Grant
Other
50,000 50,000 50,000 50,000
50,000 50,000 50,000 50,000
50,000
50,000
50,000
50,000
300,000
300,000
35 Annual Arterial Preservation Program
Capital Costs
Funding Sources:
Arterial Preservation Fund
Unsecured Grant
Other
600,000 700,000 1,700,000 1,800,000 1,800,000 1,800,000 8,400,000
600,000 700,000 1,700,000 1,800,000 1,800,000 1,800,000 8,400,000
36 Annual Arterial Crack Seal Program
Capital Costs
Funding Sources:
Arterial Preservation Fund
Unsecured Grant
Other
100,000 100,000 100,000 100,000 100,000
100,000 100,000 100,000 100,000 100,000
100,000
100,000
600,000
600,000
37 Local Streets Improvement Program
Capital Costs
Funding Sources:
Local St Preservation Fund
Unsecured Grant
Other
1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000
1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000
57 Arterial Bridge Deck Rehabilitation
Capital Costs
Funding Sources:
Arterial Preservation Fund
Unsecured Grant
Other
100,000 100,000 100,000 100,000 100,000
100,000 100,000 100,000 100,000 100,000
100,000
100,000
600,000
600,000
70 Auburn Way N Preservation (22nd Street NE
Capital Costs
Funding Sources:
Arterial Preservation Fund
Secured Grant
Other
1,775,
887,
887,
to 45th Street NE)
000 -
500 -
500 -
1,775,000
887,500
887,500
71 15th Street NE /NW Preservation (SR -167 to N
Capital Costs
Funding Sources:
Arterial Preservation Fund
Secured Grant
Other
135,
E 8th Street)
000 1,500,000
67,500 750,000
67,500 750,000
1,635,000
817,500
817,500
Subtotal, Preservation Protects:
Capital Costs
Funding Sources
Arterial Preservation Fund
Grants
Local St Preservation Fund
Total Funding
12 RES.A
4,484,380 4,878,470 3,925,000 6,650,000 3,650,000 3,650,000 27,237,850
1,831,480 1,876,370 2,025,000 2,550,000 2,050,000 2,050,000
1,052,900 1,402,100 300,000 2,500,000 - -
1,600,000 1,600,000 1,600, 000 1,600,000 1,600,000 1,600, 000
4,484,380 4,878,470 3,925,000 6,650,000 3,650,000 3,650,000
Projects & Financing Plan Summary
12,382,850
5,255,000
9,600,000
27,237,850
Page 64 of 146
City of Auburn Transportation Improvement Program
Financial Constraint & Fund Balance Summary
PROJECT FINANCING SUMMARY: 2016 2017 2018 2019 2020 2021 Total
CAPITAL COSTS
Roadway Projects 13,614,519 2,230,080 2,379,500 22,120,120 50,534,950 28,353,000 119,232,169
Int., Signal & ITS Projects 2,480,558 2,510,200 3,034,800 6,409,400 409,400 259,200 15,103,558
Non - Motorized Projects 765,000 820,000 1,170,000 1,690,000 1,563,000 5,095,000 11,103,000
Prel. Eng. and Misc. Projects 110,000 45,000 90,000 45,000 25,000 25,000 340,000
Preservation Projects 4,484,380 4,878,470 3,925,000 6,650,000 3,650,000 3,650,000 27,237,850
Total Costs 21,454,457 10,483,750 10,599,300 36,914,520 56,182,350 37,382,200 173,016,577
FUNDING SOURCES:
Unrestricted Street Revenue 1,020,000 721,000 670,000 1,171,000 1,377,000 1,043,000 6,002,000
Grants 11,405,338 4,823,100 4,625,000 18,767,700 32,579,440 11,127,000 83,327,578
Traffic Impact Fees 1,564,215 1,099,280 1,349,300 4,360,820 5,495,910 1,637,200 15,506,725
Traffic Mitigation Fees 50,000 34,000 - - - 84,000
Local Street Pres. Fund 103 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000
Arterial Preservation Fund 105 2,233,230 1,876,370 2,025,000 2,550,000 2,050,000 2,050,000 12,784,600
Cap. Imp. Fund Balance 25,000 25,000 25,000 25,000 25,000 25,000 150,000
REET2 575,000 305,000 305,000 305,000 305,000 275,000 2,070,000
Other (WSDOT) 306,674 - - 1,500,000 3,500,000 5,306,674
Other (Development) 2,300,000 - 7,985,000 11,250,000 16,125,000 37,660,000
Other (Muckleshoot Tribe) 100,000 - - - - 100,000
Other (Green River College) 175,000 - 150,000 - - 325,000
Other (White River Amp.) 50,000 - - - 50,000
Other (BNSF) 50,000 - - - 50,000
Total Funding 21,454,457 10,483,750 10,599,300 36,914,520 56,182,350 37,382,200 173,016,577
Financial Constraint & Fund Balance Summary
2016 2017 2018 2019 2020 2021
Unrestricted Street Revenue 102
Beginning Fund Balance
Forecast Annual Revenue
Project Expenses
End of Year Fund Balance
949,756 464,756 278,756 143,756 (492,244) (1,334,244)
535,000 535,000 535,000 535,000 535,000 535,000
1,020,000 721,000 670,000 1,171,000 1,377,000 1,043,000
464,756 278,756 143,756 (492,244) (1,334,244) (1,842,244)
Traffic Impact Fees
Beginning Fund Balance
Forecast Annual Revenue
Project Expenses
End of Year Fund Balance
1,720,000 1,055,785 856,505 457,205 (2,953,615) (7,449,525)
900,000 900,000 950,000 950,000 1,000,000 1,000,000
1,564,215 1,099,280 1,349,300 4,360,820 5,495,910 1,637,200
1,055,785 856,505 457,205 (2,953,615) (7,449,525) (8,086,725)
Traffic Mitigation Fees
Beginning Fund Balance 84,000 34,000 -
Forecast Annual Revenue - - -
Project Expenses 50,000 34,000 -
End of Year Fund Balance 34,000 -
Local Street Preservation Fund 103
Beginning Fund Balance 425,000 425,000 425,000 425,000 425,000 425,000
Forecast Annual Revenue 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000
Project Expenses 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000
End of Year Fund Balance 425,000 425,000 425,000 425,000 425,000 425,000
Arterial Preservation Fund 105
Beginning Fund Balance
Forecast Annual Revenue
Project Expenses
End of Year Fund Balance
445,000 111,770 135,400 110,400 (439,600) (439,600)
1,900,000 1,900,000 2,000,000 2,000,000 2,050,000 2,050,000
2,233,230 1,876,370 2,025,000 2,550,000 2,050,000 2,050,000
111,770 135,400 110,400 (439,600) (439,600) (439,600)
Grants
Secured Grants
Unsecured Grants
11,222,388 1,402,100 - - -
182,950 3,421,000 4,625,000 18,767,700 32,579,440 11,127,000
RES.A
Projects & Financing Plan Summary
Page 65 of 146
City of Auburn Transportation Improvement Program
AUBURN
14 RES.A
opo IRAN YOU MAGI
Projects & Financing Plan Summary
Page 66 of 146
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 2
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S Pedestrian Improvements (Dogwood St SE to Fir St SE)
cp1118
Non - Motorized
Jacob Sweeting
STIP# AUB -N /A
LOS Corridor ID# 4
Description:
This project will construct pedestrian improvements along Auburn Way S between Dogwood Street SE and Fir Street SE that are consistent with WSDOT's SR -164 Route
Development Plan. The project includes sidewalk improvements, access management, a mid -block pedestrian crossing, construction of a U -turn wedge for eastbound
vehicles at Fir Street SE and street lighting.
Progress Summary:
The City was awarded $100,000 in federal funding and $740,830 in state funding in May 2011. Other funding source is Muckleshoot Indian Tribe contribution. Project
design began in 2012. Design was completed in 2014 and construction started in early 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 37,816 63,428
5,000 - -
- - - -
106,244
Secured Grants (Fed,State) 235,389 604,237
- - -
- - - -
839,626
Traffic Impact Fees - 115,000
- - -
- - - -
115,000
Other (WSDOT) - 107,750
- - -
- - - -
107,750
Other(Comcast, CLink) 19,368 179,275
- - -
- - - -
198,643
Other Sources (MIT) 41,900 330,000
- - -
- - - -
371,900
Total Funding Sources: 334,473 1,399,690
5,000 - -
- - - -
1,739,163
Capital Expenditures:
Design 334,473 6,500
- - -
- - - -
340,973
Right of Way - -
- - -
- - - -
-
Construction - 1,393,190
5,000 - -
- - - -
1,398,190
Total Expenditures: 334,473 1,399,690
5,000 - -
- - - -
1,739,163
RES.A
Roadway Improvement Projects
Page 67 of 146
15
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 3
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way Corridor (4th St NE to 4th St SE)
c409a0
Non - Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 2, 3
Description:
This project is based on a pre- design study to improve pedestrian accessibility, appearance, and link the downtown area along Auburn Way S between 4th Street NE and
4th Street SE. The project may include some pavement repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in
2007. Although this was considered a temporary fix, the scope has been modified to account for the pavement work. The project is approximately 0.5 miles long.
Progress Summary:
The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 78,251 -
- - -
110,000 600,000 - -
788,251
Unsecured Grant - -
- - -
708,700 2,400,000 - -
3,108,700
REET - -
- - -
- - - -
-
Traffic Impact Fees - -
- - -
- - - -
-
Other Sources - -
- - -
- - - -
Total Funding Sources: 78,251 -
- - -
818,700 3,000,000 - -
3,896,951
Capital Expenditures:
Design 78,251 -
- - -
618,700 - - -
696,951
Right of Way - -
- - -
200,000 - - -
200,000
Construction - -
- - -
- 3,000,000 - -
3,000,000
Total Expenditures: 78,251 -
- - -
818,700 3,000,000 - -
3,896,951
RES.A
Roadway Improvement Projects
Page 68 of 146
16
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 4
Project Title:
Project No:
Project Type:
Project Manager:
I Street NE Corridor (45th St NE to S 277th St)
c415a0
Capacity
TBD
STIP# AUB-N/A
LOS Corridor ID# 21
Description:
The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan Environmental Impact Study. A portion of the ROW and
construction will be developer funded. The cross section will likely be a 5 -lane arterial per the city's Comprehensive Plan.
Progress Summary:
This project is development driven. Prior expenditures were for design and construction of culvert crossing.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,200.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016
2017
2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees 3,892 -
Other Sources (Development) - -
Other (Port of Seattle) - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6,760,000
-
- -
- -
- -
- -
- -
-
-
-
-
-
-
-
3,892
6,760,000
-
Total Funding Sources: 3,892 -
Capital Expenditures:
Design 3,892 -
Right of Way - -
Construction - -
-
-
-
-
-
-
-
-
-
-
-
-
6,760,000
460,000
1,020,000
5,280,000
- -
- -
- -
- -
-
-
-
-
6,763,892
463,892
1,020,000
5,280,000
Total Expenditures: 3,892 -
-
-
-
6,760,000
- -
-
6,763,892
RES.A
Roadway Improvement Projects
Page 69 of 146
17
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 5
Project Title:
Project No:
Project Type:
Project Manager.
M Street Underpass (3rd St SE to 8th St SE)
c201a0
Capacity
Ryan Vondrak
STIP# AUB -N /A
LOS Corridor ID# 6
Description:
Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks.
Progress Summary:
100% Design Drawings and right of way acquisition were completed in 2011. Construction started in early 2012 and was completed in 2014. Project is now in PWTFL debt
repayment. Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $21,827.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Secured Grants (Fed,State) 9,731,904 -
- - -
- - - -
9,731,904
REET2 1,140,000 -
- - -
- - - -
1,140,000
Traffic Impact Fees (Construction) 4,309,782 -
- - -
- - - -
4,309,782
Traffic Impact Fees (Debt Service) 148,190 131,233
130.654 130,080 129,500
128,920 128,350 128,000 2,372,000
3,426,927
Traffic Mitigation Fees 660,000 -
- - -
- - - -
660,000
PWTFL (30 years) 3,284,857 -
- - -
- - - -
3,284,857
Other(Agencies) 3,090,514 -
- - -
- - - -
3,090,514
22,217,057 131,233
130,654 130,080 129,500
128,920 128,350 128,000 2,372,000
22,359,127
Capital Expenditures:
Design 2,688,924 -
- - -
- - - -
2,688,924
Right of Way 3,358,443 -
- - -
- - - -
3,358,443
Construction 16,169,690 -
- - -
- - -
16,169,690
PWTF Debt Service 148,190 131,233
130,654 130,080 129,500
128,920 128,350 128,000 2,372,000
3,426,927
22,217,057 131,233
130,654 130,080 129,500
128,920 128,350 128,000 2,372,000
22,359,127
RES.A
Roadway Improvement Projects
Page 70 of 146
18
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 6
Project Title:
Project No:
Project Type:
Project Manager:
S 272nd/277th St Corridor Capacity & Non - Motorized Trail Improvements
c222a0
Capacity
Ryan Vondrak
STIP# AUB -42
LOS Corridor ID# 15
Description:
This project includes preliminary engineering, design, right of way acquisition and construction of major widening on S 277th Street, including the addition of three lanes, one
westbound and two eastbound, a Class 1 trail, and storm improvements. The project extends from Auburn Way North to L Street NE, approximately 0.9 miles.
Progress Summary:
Federal design and ROW grant was secured in 2012 through PSRC and state construction grant was secured in 2013 through TIB. Design consultant was selected in 2013.
Envirionmental permitting and design are in process. Staff is coordinating with the City of Kent and King County to complete annexation of the roadway into the City of Auburn.
Auburn and Robertson Properties Group executed a project participating agreement in 2013. RPG is contributing funds and dedicating all necessary roadway frontage to the
City.
Future Impact on Operating Budget:
The annual maintenance costs for this project is estimated to be $27,250.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 82,539 308,062
- - -
- - - -
390,601
Secured Grants (Fed,State) 407,849 612,851
4,000,000 - -
- - - -
5,020,700
Traffic Impact Fees - -
581,800 - -
- - - -
581,800
Other (RPG) - -
2,300,000 - -
- - - -
2,300,000
Other - -
- - -
- - - -
Total Funding Sources: 490,388 920,913
6,881,800 - -
- - - -
8,293,101
Capital Expenditures:
Pre - Design 10,448 -
- - -
- - - -
10,448
Design 479,940 900,913
- - -
- - - -
1,380,853
Right of Way - 20,000
1,300,000 - -
- - - -
1,320,000
Construction - -
5,581,800 - -
- - - -
5,581,800
Total Expenditures: 490,388 920,913 6,881,800 - -
- - - -
8,293,101
RES.A
Roadway Improvement Projects
Page 71 of 146
19
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 8
Project Title:
Project No:
Project Type:
Project Manager.
A Street NW, Phase 2 (W Main St to 3rd St NW)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS CorridorlD# 18
Description:
Construct a multi -lane arterial from W Main St to 3rd St NW. This project will connect A St NW, Phase 1 to the Sound Transit Station and the Central Business District.
project could be partially or fully funded by development. The project is approximately 0.2 miles long.
This
Progress Summary:
The parking garage constructed by the Aubum Regional Medical Center completed a portion of this project in 2009.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Developer) 150.000 -
- - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- 3,000,000 - -
-
-
-
3,150,000
Total Funding Sources: 150,000 -
Capital Expenditures:
Design - -
Right of Way - -
Construction 150.000 -
- - -
- - -
- - -
- - -
- 3,000,000 - -
- 250,000 - -
- - - -
- 2,750,000 - -
3,150,000
250,000
-
2,900,000
Total Expenditures: 150,000 -
- - -
- 3,000,000 - -
3,150,000
RES.A
Roadway Improvement Projects
Page 72 of 146
20
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 9
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S Improvements (Hemlock St SE to Academy Dr SE)
cpxxxx
Capacity
TBD
STIP# AUB-N/A
LOS Corridor ID# 4
Description:
Widen Auburn Way S between Hemlock St SE and Academy Dr SE to accomodate two general purpose lanes in each direction, center turn lanes, access management
medians, U- turns, curb, gutter, sidewalk, illumination, transit stop improvements, new traffic signals, Intelligent Transportation Systems, streetscape and storm
improvements. The project length is approximately two miles.
Progress Summary:
Conceptual corridor plan will be coordinated with the MIT and WSDOT in 2015. This project is planned as a partnership between the City of Auburn and the MIT. Pre -
design effort will produce a project construction cost estimate. Major grant funding is expected to come from future federal competitions. This project will extend corridor
improvements along Auburn Way S completed under previous projects.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,000.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
- - - -
-
Traffic Impact Fees - -
100,000 - -
- - - -
100,000
Other (MIT) - -
100,000 - -
- - - -
100,000
Total Funding Sources: - -
200,000 - -
- - - -
200,000
Capital Expenditures:
Pre - Design - -
200,000 - -
- - - -
200,000
Design - -
- - -
- - - -
-
RightofWay - -
- - -
- - - -
-
Construction - -
- - -
- - -
-
Total Expenditures: - -
200,000 - -
- - - -
200,000
RES.A
Roadway Improvement Projects
Page 73 of 146
21
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 10
Project Title:
Project No:
Project Type:
Project Manager:
F Street SE Non - Motorized Improvements (Downtown to Les Gove)
cp0911
Capacity, Non - Motorized
TBD
STIP# AUB -49
LOS Corridor ID# N/A
Description:
The F St SE project includes pavement rehabilitation, installation of curbs, gutters, bike lanes, sidewalks, ADA improvements, utility undergrounding, LED street lighting,
new two way center left turn -lane, crash attenuation at the supports for the BNSF railroad bridge, initiation of Auburn Staff Bikeshare pilot program, wayfinding signage
and a "Bicycle Boulevard" designation of roadway connections between Auburn City Hall and the Les Gove Park Campus. This project improves mobility and safety
along the corridor and will complete a gap in the non - motorized network between Auburn's Downtown and the Les Gove Community Campus. The major infrastructure
improvements are approximately 0.3 miles long and the "Bicycle Boulevard" improvements are just over a mile long.
Progress Summary:
Preliminary design and survey work was completed in 2009. Federal Grant was secured in 2014 for design and ROW phases. Design phase was initiated in 2015.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $4,100.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- 160,000 -
- - - -
160,000
Secured Federal Grant - 320,000
200,000 - -
- - - -
520,000
Traffic Impact Fees 7,620 80,000
50,000 200,000 -
- - - -
337,620
Unsecured Grant - -
- 1,440,000 -
- - - -
1,440,000
Total Funding Sources: 7,620 400,000
250,000 1,800,000 -
- - - -
2,457,620
Capital Expenditures:
Design 7,620 400,000
200,000 - -
- - - -
607,620
Right of Way - -
50,000 - -
- - - -
50,000
Construction - -
- 1,800,000 -
-
1,800,000
Total Expenditures: 7,620 400,000
250,000 1,800,000 -
- - - -
2,457,620
RES.A
Roadway Improvement Projects
Page 74 of 146
22
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 11
Project Title:
Project No:
Project Type:
Project Manager:
M Street NE (E Main St to 4th St NE)
asbdl2
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 5
Description:
This project will construct a complete four -lane street section on M St NE between south of E Main St and 4th St N E.
Progress Summary:
Pre - design is planned to be completed during 2015 to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,500.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
220,000 920,000 - -
1,140,000
Traffic Impact Fees - -
- - 100,000
55,000 230,000 - -
385,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - 100,000
275,000 1,150,000 - -
1,525,000
Capital Expenditures:
Design - -
- - 100,000
75,000 - - -
175,000
Right of Way - -
- - -
200,000 - - -
200,000
Construction - -
- - -
- 1,150,000 -
1,150,000
Total Expenditures: - -
- - 100,000
275,000 1,150,000 - -
1,525,000
RES.A
Roadway Improvement Projects
Page 75 of 146
23
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 12
Project Title:
Project No:
Project Type:
Project Manager:
Grade - Separated Crossing of BNSF Railyard
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will grade- separate the crossing of the BNSF Railyard, either from SR -18 to 6th Street SE or from 15th Street SW to A Street SE. The first alternative would
realign the SR -18 eastbound ramp, grade separate the main north /south line and the Stampede Pass line, and connect to 6th Street SE. The second alternative would
provide a new corridor from 15th Street SW to A Street SE in the vicinity of 12th Street SE and 17th Street SE, either via an overpass or underpass of the BNSF Railyard.
This new east/west connection will improve access and circulation associated with the potential redevelopment of the BNSF yard as an intermodal freight facility.
Progress Summary:
Future Impact on Operating Budget:
TBD
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - 1,125,000 31,000,000
-
-
-
32,125,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
- - 1,125,000 31,000,000
- - 1,125,000 2,500,000
- - - 4,000,000
- 24,500,000
32,125,000
3,625,000
4,000,000
24,500,000
Total Expenditures: - -
- - -
- - 1,125,000 31,000,000
32,125,000
RES.A
Roadway Improvement Projects
Page 76 of 146
24
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 15
Project Title:
Project No:
Project Type:
Project Manager:
8th Street NE Widening (Pike St NE to R St NE)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Widen 8th Street NE to extend the five -lane cross - section which currently exists to the west of Pike St NE to R St NE by providing an additional travel lane along the
south side of the roadway. This is a planning level cost estimate.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $600.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
Unsecured Grant - -
- - -
- - 360,000
- - - -
800,000 - - -
1,160,000
Traffic Impact Fees - -
- - 90,000
200,000 - - -
290,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - 450,000
1,000,000 - - -
1,450,000
Capital Expenditures:
Design - -
- - 200,000
- - - -
200,000
Right of Way - -
- - 250,000
- - - -
250,000
Construction - -
- - -
1,000,000 - -
1,000,000
Total Expenditures: - -
- - 450,000
1,000,000 - - -
1,450,000
RES.A
Roadway Improvement Projects
Page 77 of 146
25
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 16
Project Title:
Project No:
Project Type:
Project Manager:
49th Street NE (Auburn Way N to I St NE)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 29
Description:
Construct a new east/west corridor from Auburn Way N to I St NE. The existing 49th Street corridor extends B St NW to the west. This project also includes a traffic
signal at the intersection of Auburn Way North and 49th Street. This roadway was evaluated and recommended in the NE Special Planning Area. It is anticipated that
this will be constructed by future development. It is approximately 0.75 miles long.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $27,050.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- -
- -
- -
- -
-
-
-
-
-
-
-
850,000
- -
- -
- -
2,500,000 -
-
-
-
-
-
-
-
3,350,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- -
- -
- -
- -
-
-
-
-
850,000
250,000
600,000
2,500,000 -
- -
- -
2,500,000 -
-
-
-
-
3,350,000
250,000
600,000
2,500,000
Total Expenditures: - -
- -
-
850,000
2,500,000 -
-
3,350,000
RES.A
Roadway Improvement Projects
Page 78 of 146
26
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 25
Project Title:
Project No:
Project Type:
Project Manager:
46th Place S Realignment
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
The project will realign 46th Place S to the south of S 321st Street. The realignment will move the 46th Place S intersection with S 321st Street approximately 350 feet to
the east of the current location. This will create two T- intersections (44th Avenue S and 46th Place S) in place of the existing four -leg intersection. The existing 46th Place
S will be dead -ended to the south of S 321st Street. The project will improve safety and traffic operations at the intersections.
Progress Summary:
Right -of -way for the realigned roadway will be dedicated as part of an adjacent development project.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,750.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
- 575,000 - -
575,000
Traffic Impact Fees - -
- - -
- 250,000 - -
250,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - -
- 825,000 - -
825,000
Capital Expenditures:
Design - -
- - -
- 125,000 - -
125,000
Right of Way - -
- - -
- 25,000 - -
25,000
Construction - -
- - -
- 675,000 - -
675,000
Total Expenditures: - -
- - -
- 825,000 - -
825,000
RES.A
Roadway Improvement Projects
Page 79 of 146
27
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
CAPITAL IMPROVEMENT FUND (328)
TIP# 33
Project Title:
Project No:
Project Type:
Project Manager:
Neighborhood Traffic Calming Program
cpxxxx
Non - Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will implement neighborhood traffic calming strategies including street lighting, speed cushions, signage, speed radar signs, chicanes, traffic circles, and other
approved traffic calming devices. Projects will be selected annually based on neighborhood meetings, public surveys, and engineering studies.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017
2018
2019
2020 2021 Beyond 2021
Fund Balance - -
Unsecured Grant - -
REET 2 - 100,000
Other - -
- -
- -
100,000 100,000
- -
-
-
100,000
-
-
-
100,000
-
- - -
- - -
100,000 100,000 -
- - -
-
-
700,000
-
Total Funding Sources: - 100,000
Capital Expenditures:
Design - -
Right ofWay - -
Construction - 100,000
100,000 100,000
- -
- -
100,000 100,000
100,000
-
-
100,000
100,000
-
-
100,000
100,000 100,000 -
- - -
- - -
100,000 100,000 -
700,000
-
-
700,000
Total Expenditures: - 100,000
100,000 100,000
100,000
100,000
100,000 100,000 -
700,000
RES.A
Roadway Improvement Projects
Page 80 of 146
28
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 40
Project Title:
Project No:
Project Type:
Project Manager:
124th Ave SE Corridor Improvements (SE 312th to SE 318th)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 23
Description:
This project will fund the design, right -of -way acquisition, and construction of a four -lane section with bicycle and pedestrian facilities on 124th Ave SE between SE 318th
St and SE 312th St, and improvements to the signalized intersection of SE 312th St and 124th Ave SE (including adding bike lanes, dual westbound left -turn lanes, dual
southbound through - lanes, a northbound right -turn pocket, ITS improvements, and pedestrian safety improvements).
Progress Summary:
Phase 1 improvements between SE 318th and SE 316th were completed by Green River College in 2012.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $3,500.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - 300,000
880,000 2,000,000 - -
3,180,000
Traffic Impact Fees - -
- - 100,000
220,000 500,000 - -
820,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - 400,000
1,100,000 2,500,000 - -
4,000,000
Capital Expenditures:
Pre - Design - -
- - -
- - - -
-
Design - -
- - 400,000
- - - -
400,000
Right of Way - -
- - -
1,100,000 - - -
1,100,000
Construction - -
- - -
- 2,500,000 - -
2,500,000
Total Expenditures: - -
- - 400,000
1,100,000 2,500,000 - -
4,000,000
RES.A
Roadway Improvement Projects
Page 81 of 146
29
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 41
Project Title:
Project No:
Project Type:
Project Manager:
R Street Bypass (M Street SE to SR -18)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and Auburn Black Diamond Road, paralleling the rail
line. The project will provide an arterial connection from the newly constructed M Street Underpass to the Auburn Black Diamond Road interchange with SR -18 to keep
both vehicular and freight traffic out of residential neighborhoods along R Street SE north of the Stampede Pass line. The arterial connection may also provide
opportunities for partnering with the Muckleshoot Indian Tribe as they redevelop the Miles Pit area and as more definitive plans are developed for a potential new
WSDOT interchange on SR -18 in the vicinity of the project.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - 500,000 5,700,000
-
-
-
6,200,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
- - 500,000 5,700,000
- - 500,000 -
- - - 1,800,000
- - - 3,900,000
6,200,000
500,000
1,800,000
3,900,000
Total Expenditures: - -
- - -
- - 500,000 5,700,000
6,200,000
RES.A
Roadway Improvement Projects
Page 82 of 146
30
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 42
Project Title:
Project No:
Project Type:
Project Manager:
SE 320th Street Corridor Improvements (116th Ave SE to 122nd Ave SE)
cpxxxx
Capacity, Safety
TBD
STIP# AUB -N /A
LOS Corridor ID# 25
Description:
SE 320th St is a primary route serving Green River College and adjacent neighborhoods. There are very high volumes of pedestrians, bicyclists, and transit utilizing the
corridor. This project will fund the design, right -of -way acquisition, and construction of non - motorized roadway and safety improvements including a roundabout at 116th
Ave SE, adding bicycle lanes, sidewalks, and streetlighting between 122nd Ave SE and 116th Ave SE. Project length is approximately .45 miles.
Progress Summary:
GRCC completed the design and construction for the segment between 124th Ave SE and 122nd Ave SE in 2013. Corridor pre- design is scheduled to start in 2016.
Construction schedule is pending securing full funding.
Future Impact on Operating Budget:
This project is not expected to have a significant impact on operating budgets.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
100,000 - -
- - - -
100,000
Unsecured Grant - -
- - 480,000
530,000 2,953,440 - -
3,963,440
Traffic Impact Fees - -
- - 120,000
132,500 328,160 - -
580,660
Other - -
- - -
- - - -
-
Total Funding Sources: - -
100,000 - 600,000
662,500 3,281,600 - -
4,644,100
Capital Expenditures:
Pre - Design - -
100,000 - -
- - - -
100,000
Design - -
- - 600,000
250,000 - - -
850,000
Right of Way - -
- - -
412,500 - - -
412,500
Construction - -
- - -
- 3,281,600 - -
3,281,600
Total Expenditures: - -
100,000 - 600,000
662,500 3,281,600 - -
4,644,100
RES.A
Roadway Improvement Projects
Page 83 of 146
31
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 43
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S (SR -164) Corridor Safety Improvements (Muckleshoot Plaza to Dogwood)
cp1218
Capacity
Matt Larson
STIP# AUB -44
LOS Corridor ID# 4
Description:
This project will improve access management, including u- turns, upgrade transit stops and street lighting, widen to accomodate turn -lanes and pedestrian and bicycle
facilities, upgrade pavement markings, install pedestrian signals and audible pedestrian push buttons, and upgrade traffic signals to change the phasing and to improve
the visibility of the signal heads.
Progress Summary:
Grant funding was awarded in 2012. Design began in 2012 and construction is scheduled for 2016.
Future Impact on Operating Budget:
This project is expected to have a neglible impact on operating budgets.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 2,768 -
- - -
- - - -
2,768
Grants (Fed,State,Local) 98,470 283,325
1,951,313 - -
- - - -
2,333,108
Traffic Impact Fees - 160,322
89,678 - -
- - - -
250,000
Other (WSDOT) - -
306,674 - -
- - - -
306,674
Total Funding Sources: 101,238 443,647
2,347,665 - -
- - - -
2,892,550
Capital Expenditures:
Design 101,238 374,062
- - -
- - - -
475,300
Right of Way - 69,585
- - -
- - - -
69,585
Construction - -
2,347,665 - -
- - - -
2,347,665
Total Expenditures: 101,238 443,647
2,347,665 - -
- - - -
2,892,550
RES.A
Roadway Improvement Projects
Page 84 of 146
32
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 49
Project Title:
Project No:
Project Type:
Project Manager:
W Valley Highway Improvements (15th Street NW to W Main Street)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 35
Description:
This project scope includes pavement rehabilitation and re- channelization, roadway widening, bicycle lanes, pedestrian facilities, roadway lighting, required storm system
improvements, and Intelligent Transportation System Improvements.
Progress Summary:
Survey, base mapping and pre- design are planned to be completed in 2018 to complete preliminary plans and refine project cost - estimate.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
480,000 2,400,000 - -
2,880,000
Traffic Impact Fees - -
- - 100,000
120,000 600,000 - -
820,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - 100,000
600,000 3,000,000 - -
3,700,000
Capital Expenditures:
Design - -
- - 100,000
600,000 - - -
700,000
Right of Way - -
- - -
- - - -
-
Construction - -
- - -
- 3,000,000 - -
3,000,000
Total Expenditures: - -
- - 100,000
600,000 3,000,000 - -
3,700,000
RES.A
Roadway Improvement Projects
Page 85 of 146
33
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102), ARTERIAL PRESERVATION FUND (105)
TIP# 55
Project Title:
Project No:
Project Type:
Project Manager:
W Main Street Multimodal Corridor and ITS Improvements (WVH to Interurban Trail)
CP1415
Capacity
Kim Truong
STIP# AUB -50
LOS Corridor ID# 11
Description:
This project will repurpose the existing W Main St corridor within Auburn's designated Regional Growth Center and will construct Intelligent Transportation System (ITS)
improvements serving local and regional transportation networks and a major commercial retail center. Improvements include converting the existing four -lane roadway
section to a three -lane section including center two -way left turn lane with new bike lanes, new sidewalks, new LED street lighting, and streetscape improvements
between West Valley Highway and the Interurban Trail. ITS Improvements include interconnecting and coordinating traffic signals From C St NW along W Main St to W
Valley Highway south to 15th St SW including two interchanges with SR -18 and one with SR -167.
Progress Summary:
Project was awarded federal grant in 2014. Design started in 2015 and construction is scheduled to begin in 2016.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - 56,490
- - -
- - - -
56,490
Unsecured Grant - 804,100
2,970,240 - -
- - - -
3,774,340
Traffic Impact Fees 4,538 -
209,650 - -
- - - -
214,188
Other (Arterial Pres. Fund) - 85,410
314,510 - -
- - - -
399,920
Total Funding Sources: 4,538 946,000
3,494,400 - -
- - - -
4,444,938
Capital Expenditures:
Pre - Design 4,538 -
- - -
- - - -
4,538
Design - 946,000
- - -
- - - -
946,000
Right of Way - -
- - -
- - - -
-
Construction - -
3,494,400 - -
- - - -
3,494,400
Total Expenditures: 4,538 946,000
3,494,400 - -
- - - -
4,444,938
RES.A
Roadway Improvement Projects
Page 86 of 146
34
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 58
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S Corridor Improvements (Fir St SE to Hemlock St SE)
cp1119
Capacity
Jacob Sweeting
STIP# AUB -N /A
LOS Corridor ID# 4
Description:
This project will widen Auburn Way South between Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalk, illumination and storm improvements. A new
traffic signal will be constructed at Hemlock Street SE and connect to Auburn's Intelligent Transportation System.
Progress Summary:
Washington State Transportation Improvement Board (TIB) awarded the City grant funds in the amount of $2,426,400 on November 19, 2010. The Muckleshoot Indian
Tribe is a project partner and is contributing ROW dedications and project funding in the amount $836,601.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $9,300.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 195,060 -
5,000 - -
- - - -
200,060
Secured State Grant 508,176 2,061,951
- - -
- - - -
2,570,127
Traffic Impact Fees 200,000 450,000
- - -
- - - -
650,000
Other (Comcast,Clink) 94,107 142,967
Other (WSDOT) 116,038
Other(MIT) 101,006 735,594
- - -
- - - -
836,600
Total Funding Sources: 1,098,349 3,506,550
5,000 - -
- - - -
4,256,787
Capital Expenditures:
Design 666,617 39,816
- - -
- - - -
706,433
Right of Way 431,732 -
- - -
- - - -
431,732
Construction - 3,466,734
5,000 - -
- - - -
3,471,734
Total Expenditures: 1,098,349 3,506,550
5,000 - -
- - - -
4,609,899
RES.A
Roadway Improvement Projects
Page 87 of 146
35
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 60
Project Title:
Project No:
Project Type:
Project Manager:
M Street SE Corridor (8th St SE to AWS)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 6
Description:
Widen M Street SE into a multi -lane arterial between 8th St SE and AWS. This project will improve mobility and is tied to corridor development. It is consistent with the
Comprehensive Plan and contributes to the completion of a north /south arterial corridor.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- - -
- - -
- - -
- - -
- - - -
925,000 3,750,000 - -
750,000 750,000 - -
250,000 250,000 - -
-
4,675,000
1,500,000
500,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
1,925,000 4,750,000 - -
650,000 - - -
1,275,000 - - -
- 4,750,000 - -
6,675,000
650,000
1,275,000
4,750,000
Total Expenditures: - -
- - -
1,925,000 4,750,000 - -
6,675,000
RES.A
Roadway Improvement Projects
Page 88 of 146
36
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 61
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S Bypass (Riverwalk Dr to SR -18 at R St SE)
cpxxxx
Capacity
TBD
STIP# AUB-N/A
LOS Corridor ID# N/A
Description:
This project will construct a new roadway corridor to bypass Auburn Way South. The new roadway will extend from Riverwalk Drive to R Street SE to the north of SR -18. A
new connection to a new interchange with SR -18.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- - -
- - -
- - -
- - -
- - - -
- - 4,800,000 43,560,000
- - - -
- - 1,200,000 10,890,000
-
48,360,000
12,090,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
- - 6,000,000 54,450,000
- - 6,000,000 -
- - - 6,000,000
- - - 48,450,000
60,450,000
6,000,000
6,000,000
48,450,000
Total Expenditures: - -
- - -
- - 6,000,000 54,450,000
60,450,000
RES.A
Roadway Improvement Projects
Page 89 of 146
37
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 62
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S Streetscape Improvements (SR -18 to M St SE)
cpxxxx
Miscellaneous
TBD
STIP# AUB -N /A
LOS Corridor ID# 3
Description:
This project will revitalize and beautify Auburn Way S from the SR -18 interchange to the intersection with M Street SE. Proposed improvements include: enhancement of
crosswalks and pedestrian linkages; new and repaired sidewalks; curb and gutter; pedestrian ramps; new landscaped medians; street trees; new lighting; pedestrian
benches; trash receptacles; recycling containers and other appropriate amenities.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2,016 2,017 2,018
2,019 2,020 2,021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- - -
- - -
200,000 200,000 - -
1,750,000 2,600,000 - -
- - - -
- - - -
400,000
4,350,000
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
1,950,000 2,800,000 - -
500,000 - - -
1,450,000 - - -
- 2,800,000 - -
4,750,000
500,000
1,450,000
2,800,000
Total Expenditures: - -
- - -
1,950,000 2,800,000 - -
4,750,000
RES.A
Roadway Improvement Projects
Page 90 of 146
38
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 64
Project Title:
Project No:
Project Type:
Project Manager:
Lea Hill Rd Segment 1 (R St NE to 105th PI SE)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Widen the existing roadway to provide a four -lane cross section with pedestrian and bicycle facilities. The project includes widening the Green River Bridge.
Progress Summary:
Three parcels along the future roadway alignment were procured in 2014. Corridor pre- design effort is planned to begin in mid 2015 following adoption of the
Comprehensive Transportation Plan major update.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $18,300.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- -
- - - -
-
Unsecured Grant - -
- - -
1,950,000 8,000,000 - -
9,950,000
Traffic Impact Fees 430,000 50,000
100,000 - -
500,000 2,000,000 - -
3,080,000
Other - -
- - -
- - - -
-
Total Funding Sources: 430,000 50,000
100,000 - -
2,450,000 10,000,000 - -
13,030,000
Capital Expenditures:
Design - 50,000
100,000 - -
1,950,000 - - -
2,100,000
Right of Way 430,000 -
- - -
500,000 - - -
930,000
Construction - -
- - -
- 10,000,000 - -
10,000,000
Total Expenditures: 430,000 50,000
100,000 - -
2,450,000 10,000,000 - -
13,030,000
RES.A
Roadway Improvement Projects
Page 91 of 146
39
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 65
Project Title:
Project No:
Project Type:
Project Manager:
Lea Hill Rd Segment 2 (105th PI SE to 112th Ave SE)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Project includes widening the existing roadway to provide a four -lane cross - section including pedestrian and bicycle facilities.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $24,100.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
- 2,900,000 7,100,000 -
10,000,000
Traffic Impact Fees - -
- - -
- 600,000 1,400,000 -
2,000,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - -
- 3,500,000 8,500,000 -
12,000,000
Capital Expenditures:
Design - -
- - -
- 2,000,000 - -
2,000,000
Right of Way - -
- - -
- 1,500,000 - -
1,500,000
Construction - -
- - -
- - 8,500,000 -
8,500,000
Total Expenditures: - -
- - -
- 3,500,000 8,500,000 -
12,000,000
RES.A
Roadway Improvement Projects
Page 92 of 146
40
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 66
Project Title:
Project No:
Project Type:
Project Manager:
Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Project includes widening the existing roadway to provide a four -lane cross - section including pedestrian and bicycle facilities.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $20,300.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- - -
- - -
- - - -
- 3,000,000 - -
1,000,000 - - -
- - - -
-
3,000,000
1,000,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
1,000,000 3,000,000 - -
500,000 - - -
500,000 - - -
- 3,000,000 - -
4,000,000
500,000
500,000
3,000,000
Total Expenditures: - -
- - -
1,000,000 3,000,000 - -
4,000,000
RES.A
Roadway Improvement Projects
Page 93 of 146
41
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 72
Project Title:
Project No:
Project Type:
Project Manager:
W Valley Highway Improvements (SR -18 to 15th St SW)
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 35
Description:
This project scope includes pavement rehabilitation and re- channelization, pedestrian and bicycle facility improvements, improved roadway lighting, required storm system
improvements, intersection signal replacement at 15th St SW, and Intelligent Transportation System Improvements.
Progress Summary:
Survey, base mapping and pre- design are planned to be completed in 2016 to complete preliminary plans and refine project cost - estimate.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - 400,000
2,000,000 - - -
2,400,000
Traffic Impact Fees - -
- 100,000 100,000
500,000 - - -
700,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- 100,000 500,000
2,500,000 - - -
3,100,000
Capital Expenditures:
Design - -
- 100,000 500,000
- - - -
600,000
Right of Way - -
- - -
- - - -
-
Construction - -
- - -
2,500,000 - - -
2,500,000
Total Expenditures: - -
- 100,000 500,000
2,500,000 - - -
3,100,000
RES.A
Roadway Improvement Projects
Page 94 of 146
42
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP # 73
Project Title:
Project No:
Project Type:
Project Manager:
Stewart Road (Lake Tapps Parkway Corridor)
N/A
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is a City of Pacific project to widen the Stewart Road (Lake Tapps Parkway) Corridor. This is the final segment of widening in the City of Pacific which will tie in with
the city of Sumner's planned final widening segment and new bridge over the White river. Completion of this corridor widening is expected to significantly relieve traffic
congestion in Auburn along the A St SE and C St SE corridors.
Progress Summary:
City of Pacific has initiated preliminary road design and is applying for grant funding to complete the project. City of Auburn contribution is for construction phase only.
Future Impact on Operating Budget:
There is no future impact to Auburn's operating budgets.
Activity: 2015 YE
Budget
Forecast Project Cost
Total Project
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Cost
Unrestricted Street Revenue - -
- 66,000 -
- - - -
66,000
Unsecured Grant - -
- - -
- - - -
-
Traffic Impact Fees - -
- - -
- - - -
-
Traffic Mitigation Fees - -
- 34,000 -
- - - -
34,000
Total Funding Sources: - -
- 100,000 -
- - - -
100,000
Capital Expenditures:
Design - -
- - -
- - - -
-
RightofWay - -
- - -
- - - -
-
Construction - -
- 100,000 -
- - - -
100,000
Total Expenditures: - -
- 100,000 -
- - - -
100,000
RES.A
Roadway Improvement Projects
Page 95 of 146
43
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP # 75
Project Title:
Project No:
Project Type:
Project Manager:
R St SE Corridor Extension
cpxxxx
Capacity
TBD
STIP# AUB-XX
LOS Corridor ID# XX
Description:
This project will construct a new segment of R St SE approximately .7 miles long between 17th St SE and the future bypass road connecting M St SE and Auburn Black
Diamond road.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,000.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project
Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- 2,000,000 8,000,000 -
-
-
-
10,000,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
- 2,000,000 8,000,000 -
- 2,000,000 - -
- - - -
- - 8,000,000 -
10,000,000
2,000,000
-
8,000,000
Total Expenditures: - -
- - -
- 2,000,000 8,000,000 -
10,000,000
RES.A
Roadway Improvement Projects
Page 96 of 146
44
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 14
Project Title:
Project No:
Project Type:
Project Manager:
M Street SE & 12th Street SE Traffic Signal
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 6
Description:
This project includes the design, right of way acquisistion and construction of a new traffic signal.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (Development) - -
- - -
- - -
- - -
- - -
-
500,000
-
125,000
- -
- -
- -
- -
-
-
-
-
-
500,000
-
125,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
625,000
75,000
50,000
500,000
- -
- -
- -
- -
-
-
-
-
625,000
75,000
50,000
500,000
Total Expenditures: - -
- - -
625,000
- -
-
625,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems m y 97 1 Projects 45
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 17
Project Title:
Project No:
Project Type:
Project Manager:
Harvey Rd NE & 8th St NE Intersection Improvements
cp0611
Capacity
None
STIP# AUB -N /A
LOS Corridor ID# 5,19
Description:
Add one eastbound through /right turn -lane on 8th St NE to the west of Harvey Rd. Modify traffic signals and traffic channelization to accommodate the new lane. The
additional lane will reduce traffic delays and queuing at the intersection of Harvey Rd and 8th St NE in all directions. This project will reconstruct M St NE from 4th St NE to 8th
St NE, a segment of roadway approximately 0.3 miles long with a four -lane cross - section. The reconstruction will address the existing poor pavement condition and fill in any
gaps in the sidewalk network.
Progress Summary:
Project was completed in 2010. Ongoing budget is for PWTFL debt payments.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
- - - -
-
Unsecured Grant - -
- - -
- - - -
-
Traffic Impact Fees (Debt Service) 435,500 86,010
85,383 85,200 84,800
84,400 84,400 84,200 573,400
1,603,293
Traffic Impact Fees 204,500 -
- - -
- - - -
204,500
PWTF 1,527,300 -
- - -
- - - -
1,527,300
Total Funding Sources: 1,731,800 86,010
85,383 85,200 84,800
84,400 84,400 84,200 573,400
1,807,793
Capital Expenditures:
Design 327,500 -
- - -
- - - -
327,500
Right of Way 200,400 -
- - -
- - - -
200,400
Construction 1,203,900 -
- - -
- -
1,203,900
Long Term Debt: PWTF 435,500 86,010
85,383 85,200 84,800
84,400 84,400 84,200 573,400
1,603,293
Total Expenditures: 1,731,800 86,010
85,383 85,200 84,800
84,400 84,400 84,200 573,400
1,807,793
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Projects 46
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102), CAPITAL IMPROVEMENT FUND (328)
TIP# 18
Project Title:
Project No:
Project Type:
Project Manager:
M Street SE & 29th Street SE Intersection Safety Improvements
CPXXXX
Non - Capacity, Safety
TBD
STIP# AUB -N /A
LOS Corridor ID# 27
Description:
This project includes the design and construction of a new traffic signal.
Progress Summary:
M St SE & 29th St SE is currently an all -way stop controlled intersection, experiences significant congestion in the peak traffic hours, and has a documented high collision
history. Design is scheduled to be completed in 2016. Construction will be completed when project is fully funded.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
50,000 - -
- - -
- - -
- - -
100,000 - - -
300,000 - - -
- - - -
- - - -
150,000
300,000
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
50,000 - -
50,000 - -
- - -
- - -
400,000 - - -
- - - -
- - - -
400,000 - -
450,000
50,000
-
400,000
Total Expenditures: - -
50,000 - -
400,000 - - -
450,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Projects 47
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 19
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way N & 1st Street NE Signal Improvements
cpxxxx
Non - Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 2
Description:
This project will construct a new traffic signal with controller cabinet and battery backup along with necessary intersection improvements.
Progress Summary:
Design is scheduled to be completed in 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
50,000 - 125,000
- - - -
175,000
Grants (Fed,State,Local) - -
- - 425,000
- - - -
425,000
Traffic Impact Fees - -
- - -
- - - -
-
Other - -
- - -
- - - -
-
Total Funding Sources: - -
50,000 - 550,000
- - - -
600,000
Capital Expenditures:
Design - -
50,000 - -
- - - -
50,000
Right of Way - -
- - 100,000
- - - -
100,000
Construction - -
- - 450,000
- -
450,000
Total Expenditures: - -
50,000 - 550,000
- - - -
600,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems m y 10 Projects 48
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 20
Project Title:
Project No:
Project Type:
Project Manager:
R Street SE & 21st Street SE Intersection Safety Improvements
CPXXXX
Non - Capacity, Safety
TBD
STIP# AUB -N /A
LOS Corridor ID# 16
Description:
This project includes the design and construction of a intersection safety improvements.
Progress Summary:
R St SE & 21st St SE is currently an two -way stop controlled intersection, experiences significant congestion in the peak traffic hours, and has a documented high
collision history. Analysis to determine appropriate intersection control and design is scheduled to be completed in 2016. Construction will be completed when project is
fully funded.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
75,000 - -
100,000 - - -
175,000
Unsecured Grant - -
- - -
700,000 - - -
700,000
Traffic Impact Fees - -
- - -
- - - -
-
Traffic Mitigation Funds - -
- - -
- - - -
-
Other - -
- - -
- - - -
-
Total Funding Sources: - -
75,000 - -
800,000 - - -
875,000
Capital Expenditures:
Design - -
75,000 - -
- - - -
75,000
Right of Way - -
- - -
- - - -
-
Construction - -
- - -
800,000 - -
800,000
Total Expenditures: - -
75,000 - -
800,000 - - -
875,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
49
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 21
Project Title:
Project No:
Project Type:
Project Manager:
Main Street Signal Upgrades
cp1406
Non - Capacity
Seth Wickstrom
STIP# AUB -N /A
LOS Corridor ID# 11
Description:
Reconstruct the existing traffic signals at C St NW and W Main St and at E Main St and Auburn Ave /A St SE. The new C St NW signal would provide protected left -turn
phasing for C St, and would provide additional safety related to the railroad pre - emption. The Auburn Ave /A St signal would replace one of the City's oldest signals which
has exceeded its design life.
Progress Summary:
Design started in 2014 and construction is expected to start in 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - 315,000
Grants (Fed,State,Local) - -
Traffic Impact Fees - -
Traffic Mitigation Fees 11,232 138,768
Other - -
5,000 -
-
- - -
- -
- - -
- - - -
- - - -
- - - -
- - - -
- - - -
320,000
-
-
150,000
-
Total Funding Sources: 11,232 453,768
Capital Expenditures:
Design 11,232 38,768
Right of Way - -
Construction - 415,000
5,000 - -
- - -
- - -
5,000 - -
- - - -
- - - -
- - - -
- - -
470,000
50,000
-
420,000
Total Expenditures: 11,232 453,768
5,000 - -
- - - -
470,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
50
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
CAPITAL IMPROVEMENT FUND (328)
TIP# 34
Project Title:
Project No:
Project Type:
Project Manager:
Traffic Signal Improvements
Various
Non - Capacity (Annual)
Scott Nutter
STIP# AU B -N /A
LOS Corridor ID# N/A
Description:
This project includes procuring capital equipment needed to replace cabinets, video detection cameras, conflict monitors and upgrade pedestrian pushbuttons to APS. This
project is also used to make safety improvements to our signals like auxiliary heads and flashing yellow arrows, or capacity improvements like right turn overlap signals.
The City uses current traffic counts and accident data to determine intersections for these improvements.
Progress Summary:
Project continues to complete various intersection improvements.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017
2018
2019
2020 2021 Beyond 2021
Total Project Cost
Cap. Imp. Fund Balance - -
- -
-
-
- - -
-
Unsecured Grant - -
- -
-
-
- - -
-
REET 2 - 175,000
175,000 175,000
175,000
175,000
175,000 175,000 -
1,225,000
Other - -
- -
-
-
- - -
-
Total Funding Sources: - 175,000
175,000 175,000
175,000
175,000
175,000 175,000 -
1,225,000
Capital Expenditures:
Design - 25,000
25,000 25,000
25,000
25,000
25,000 25,000 -
175,000
Right of Way - -
- -
-
-
- - -
-
Construction - 150,000
150,000 150,000
150,000
150,000
150,000 150,000 -
1,050,000
Total Expenditures: - 175,000
175,000 175,000
175,000
175,000
175,000 175,000 -
1,225,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 103 f Projects 51
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP # 38
Project Title:
Project No:
Project Type:
Project Manager:
C Street SW & 15th Street SW Intersection Improvements
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 12, 13
Description:
This project will install a southbound right -turn pocket, re- channelize the intersection to provide two southbound through lanes, and replace the existing spanwire traffic
signal with a new traffic signal.
Progress Summary:
Design is planned to begin in 2017. Construction will be sheduled once full funding is secured.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project
Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- 150,000 -
- - -
- - - -
750,000 - - -
125,000 - - -
- - - -
-
750,000
275,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- 150,000 -
- 150,000 -
- - -
- - -
875,000 - - -
- - - -
- - - -
875,000 - - -
1,025,000
150,000
-
875,000
Total Expenditures: - -
- 150,000 -
875,000 - - -
1,025,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 104 f Projects 52
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 39
Project Title:
Project No:
Project Type:
Project Manager:
124th Avenue SE & SE 320th Street Intersection Improvements
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 23, 25
Description:
This project will fund the design, right -of -way acquisition, and construction of improvements to the intersection of SE 320th St and 124th Ave SE. The intersection is
located at the main entrance to Green River College and will require additional on -site improvements to be constructed.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
175,000 - -
150,000 - - -
325,000
Unsecured Grant - -
- - -
1,200,000 - - -
1,200,000
Traffic Impact Fees - -
- - -
- - - -
-
Other (GRC) - -
175,000 - -
150,000 - - -
325,000
Total Funding Sources: - -
350,000 - -
1,500,000 - - -
1,850,000
Capital Expenditures:
Design - -
350,000 - -
- - - -
350,000
Right of Way - -
- - -
- - - -
-
Construction - -
- - -
1,500,000 - - -
1,500,000
Total Expenditures: - -
350,000 - -
1,500,000 - - -
1,850,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
53
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 47
Project Title:
Project No:
Project Type:
Project Manager:
Traffic Management Center Improvements
cpxxxx
Capacity, ITS
Pablo Para
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
The rapid growth of the City traffic signal and Intelligent Transportation Systems infrastructure has severely strained the capacity and reliability of the existing network
processing capabilities. This project will implement network communications, software, video, and physical improvements to the Traffic Management Center which will
improve the network data processing speed, reliability, and redundancy improving the City's ability to manage the transportation system and respond to emergencies.
Additionally, these improvement will allow Information & Technology staff to isolate the Traffic Management data processing demands from the City's general facility
security data processing demands resulting in improvements to both processes.
Progress Summary:
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - 125,000
Other - -
- - -
- - -
25,000 - -
- - -
- - - -
- - - -
- - - -
- - - -
-
-
150,000
-
Total Funding Sources: - 125,000
Capital Expenditures:
Design - 5,000
Right of Way - -
Construction - 120,000
25,000 - -
- - -
- - -
25,000 - -
- - - -
- - - -
- - - -
- - - -
150,000
5,000
-
145,000
Total Expenditures: - 125,000
25,000 - -
- - - -
150,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
54
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 48
Project Title:
Project No:
Project Type:
Project Manager:
A Street SE & 6th Street SE Safety and Access Improvements
cpxxxx
Non - Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 10
Description:
This project is a partnership between Auburn and Burlington Northern Santa Fe Railway to improve the intersection of A St SE and 6th St SE. The scope of the project
includes adding a phase to the traffic signal for traffic entering and exiting the BNSF railyard.
Progress Summary:
Design and construction is planned to be completed in 2016 pending agreement with BNSF.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other (BNSF) - -
- - -
- - -
- - -
50,000 - -
- - - -
- - - -
- - - -
- - - -
-
-
-
50,000
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
50,000 - -
10,000 - -
- - -
40,000 - -
- - - -
- - - -
- - - -
- - - -
50,000
10,000
-
40,000
Total Expenditures: - -
50,000 - -
- - - -
50,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 107 f Projects 55
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 45
Project Title:
Project No:
Project Type:
Project Manager:
124th Avenue SE & SE 284th Street Intersection Safety Improvements
cpxxxx
Capacity, Safety
TBD
STIP# AUB -N /A
LOS Corridor ID# 23, 40, 41
Description:
This project will complete the design phase for intersection safety and capacity improvements.
Progress Summary:
Future Impact on Operating Budget:
TBD
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - 450,000
- 100,000 150,000
- - -
-
-
-
-
- -
- -
- -
- -
-
-
-
-
-
450,000
250,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- 100,000 600,000
- 100,000 -
- - 50,000
- - 550,000
-
-
-
-
- -
- -
- -
- -
-
-
-
-
700,000
100,000
50,000
550,000
Total Expenditures: - -
- 100,000 600,000
-
- -
-
700,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 108 f Projects 56
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
CAPITAL IMPROVEMENT FUND (328)
TIP# 50
Project Title:
Project No:
Project Type:
Project Manager:
ITS Dynamic Message Signs
cpxxxx
Non - Capacity (ITS)
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project funds the design and construction of Dynamic Message Signs at various locations throughout the City. Dynamic message signs are an important ITS tool for
providing information to roadway users. Priority locations for sign placement are based on the Comprehensive Transportation Plans ITS map and include Auburn Way N,
Auburn Way S, W Valley Highway, E Valley Highway, Lake Tapps Parkway, and Lea Hill Rd.
Progress Summary:
The first phase of this project is scheduled to begin in 2016 or sooner if grant funding becomes available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017
2018
2019
2020 2021 Beyond 2021
Total Project Cost
Cap. Imp. Fund Balance - -
- -
-
-
- - -
-
Unsecured Grant - -
- 120,000
120,000
120,000
120,000 - -
480,000
REET 2 - -
100,000 30,000
30,000
30,000
30,000 - -
220,000
Other (WRA) - -
50,000 -
-
-
- - -
50,000
Total Funding Sources: - -
150,000 150,000
150,000
150,000
150,000 - -
750,000
Capital Expenditures:
Design - -
15,000 15,000
15,000
15,000
15,000 - -
75,000
Right of Way - -
- -
-
-
- - -
-
Construction - -
135,000 135,000
135,000
135,000
135,000 - -
675,000
Total Expenditures: - -
150,000 150,000
150,000
150,000
150,000 - -
750,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
57
City of Auburn Transportation Improvement Program
•
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 51
Project Title:
Project No:
Project Type:
Project Manager:
Lake Tapps Parkway ITS Expansion
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 17
Description:
The project funds the design, coordination, permitting, and construction of new ITS infrastructure along Lake Tapps Parkway from Lakeland Hills Way to East Valley
Highway, and along East Valley Highway to Lakeland Hills Way. The proposed ITS infrastructure includes conduit, fiber, VMS signage, cameras, network communication
upgrades, and weather stations along the route.
Progress Summary:
Federal Grant application was submitted to PSRC in May 2014. Project is currently on the contingency list.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
Unsecured Grant - -
- - -
82,950 711,000 -
- - - -
- - - -
793,950
Traffic Impact Fees - -
22,050 189,000 -
- - - -
211,050
Other - -
- - -
- - - -
-
Total Funding Sources: - -
105,000 900,000 -
- - - -
1,005,000
Capital Expenditures:
Design - -
105,000 - -
- - - -
105,000
Right of Way - -
- - -
- - - -
-
Construction - -
- 900,000 -
- - - -
900,000
Total Expenditures: - -
105,000 900,000 -
- - - -
1,005,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 110 f Projects 58
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 52
Project Title:
Project No:
Project Type:
Project Manager:
A Street SE & Lakeland Hills Way SE Intersection Safety & Capacity Improvements
CPXXX
Capacity, Safety
TBD
STIP# AU B -N /A
LOS Corridor ID# 10, 34
Description:
This project will study traffic operations, safety, and prepare a preliminary design intersection improvements.
Progress Summary:
Analysis, preliminary design, and construction cost estimate will be completed in 2016. Future phases will be programmed as funding becomes available.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
75,000 - -
- - -
- - - -
- - - -
- - - -
- - - -
-
-
75,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
75,000 - -
75,000 - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
75,000
75,000
-
-
Total Expenditures: - -
75,000 - -
- - - -
75,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement 59
e of
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 53
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way S & 12th Street SE Intersection Improvements
cp1114
Capacity, Safety
TBD
STIP# AUB -N /A
LOS Corridor ID# 3
Description:
The project will design multi -modal intersection improvements at the AWS /12th Street SE intersection. The improvements will include pedestrian access improvements,
channelization improvements to add bicycle lanes, new traffic signal, and ITS upgrades.
Progress Summary:
Design is scheduled to be completed in 2016. Construction phase is contingent on future funding or the award of a grant.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
100,000 - -
- - - -
100,000
Unsecured Grant - -
- 750,000 -
- - - -
750,000
Traffic Impact Fees - 50,000
- - -
- - - -
50,000
Other - -
- - -
- - - -
-
Total Funding Sources: - 50,000
100,000 750,000 -
- - - -
900,000
Capital Expenditures:
Design - 50,000
100,000 - -
- - - -
150,000
Right of Way - -
- - -
- - - -
-
Construction - -
- 750,000 -
- - - -
750,000
Total Expenditures: - 50,000
100,000 750,000 -
- - - -
900,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 112 f Projects 60
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 59
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Avenue NE & 3rd Street NE Pedestrian & Access Improvements
cp1023
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 2
Description:
This project will improve access, safety and operations for pedestrian, bicyclists and motorized vehicles at the intersections of 3rd St NE /Auburn Ave, 4th St NE /Auburn
Ave, and 4th St NE /Auburn Way North. Improvements include a new traffic signal and geometric improvements at 3rd St NE to add a missing pedestrian crossing and
accomodate the northbound left -turn movement; improving pedestrian facilities to meet ADA requirements, restricting uncontrolled accesses near the intersection, and
modifying the traffic signal at Auburn Way North and 4th St NE to eliminate the east/west split phase operation.
Progress Summary:
Survey and pre - design were started in 2010 -2011. Pre - design will be completed in 2017, with construction scheduled for 2018, pending grant funding.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue 8,778 -
Unsecured Grant - -
Traffic Impact Fees - -
REET2 - -
Other - -
- - -
- - 250,000
- 50,000 50,000
- - -
- - -
- - - -
- - - -
- - - -
- - - -
- - - -
8,778
250,000
100,000
-
-
Total Funding Sources: 8,778 -
Capital Expenditures:
Design 8,778 -
Right of Way - -
Construction - -
- 50,000 300,000
- 50,000 -
- - -
- - 300,000
- - - -
- - - -
- - - -
- - - -
358,778
58,778
-
300,000
Total Expenditures: 8,778 -
- 50,000 300,000
- - - -
358,778
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement
61
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 63
Project Title:
Project No:
Project Type:
Project Manager:
29th Street SE & R Street SE Intersection Improvements
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 16, 27
Description:
This project funds the design, right -of -way acquisition and construction of intersection capacity and safety improvements at the 29th St SE /R St SE intersection.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- - -
- - -
- - - -
1,300,000 - - -
500,000 - - -
- - - -
1,300,000
500,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
1,800,000 - - -
350,000 - - -
450,000 - - -
1,000,000 - - -
1,800,000
350,000
450,000
1,000,000
Total Expenditures: - -
- - -
1,800,000 - - -
1,800,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 114 f Projects 62
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 67
Project Title:
Project No:
Project Type:
Project Manager:
Traffic Signal Safety Improvements
CP1501
Non - Capacity, Safety
Ryan Vondrak
STIP# AUB -52
LOS Corridor ID# N/A
Description:
Improve traffic signal phasing and timing, and improve visibility of traffic signal heads.
Progress Summary:
Federal Grant was awarded in 2014. Design phase began in 2015 and construction is scheduled for completion in 2016.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - 5,000
Secured Federal Grant - -
Traffic Impact Fees - -
REET2 - 27,600
Other - -
- - -
412,575 - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
- - - -
5,000
412,575
-
27,600
-
Total Funding Sources: - 32,600
Capital Expenditures:
Design - 32,600
Right of Way - -
Construction - -
412,575 - -
- - -
- - -
412,575 - -
- - - -
- - - -
- - - -
- - - -
445,175
32,600
-
412,575
Total Expenditures: - 32,600
412,575 - -
- - - -
445,175
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 115 f Projects 63
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102), ARTERIAL PRESERVATION FUND (105)
TIP# 68
Project Title:
Project No:
Project Type:
Project Manager:
A Street SE & 37th Street SE Intersection Improvements
CP1502
Non - Capacity, Safety
Ryan Vondrak
STIP# AUB -53
LOS Corridor ID# 10
Description:
Widen the intersection for a u -turn, install an interconnected traffic signal, overlay the intersection, and upgrade curb ramps.
Progress Summary:
Federal Grant was awarded in 2014.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - 55,000
- - -
- - - -
55,000
Secured Federal Grant - 156,900
635,360 - -
- - - -
792,260
Traffic Impact Fees - -
- - -
- - - -
-
Arterial Preserv. Funds (105) - -
87,240 - -
- - - -
87,240
Total Funding Sources: - 211,900
722,600 - -
- - - -
934,500
Capital Expenditures:
Pre - Design - 10,500
- - -
- - - -
10,500
Design - 135,000
- - -
- - - -
135,000
Right of Way - 66,400
- - -
- - - -
66,400
Construction - -
722,600 - -
- - - -
722,600
Total Expenditures: - 211,900
722,600 - -
- - - -
934,500
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 116 f Projects 64
o
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 69
Project Title:
Project No:
Project Type:
Project Manager:
I Street NE & 22nd Street NE Roundabout Safety Improvement
cpxxxx
Capacity (Safety)
TBD
STIP# AUB -N /A
LOS Corridor ID# 21
Description:
This project includes the design and construction of a roundabout at the 22nd Street NE intersection with I Street NE. This is currently a all -way stop controlled intersection.
Progress Summary:
Preliminary Design was initiated in 2015. Final design and construction are dependant on securing full funding.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
Unsecured Grant - -
- - -
- 100,000 940,000
- - - -
- - - -
1,040,000
Traffic Impact Fees - 50,000
50,000 50,000 235,000
- - - -
385,000
Other - -
- - -
- - - -
-
Total Funding Sources: - 50,000
50,000 150,000 1,175,000
- - - -
1,425,000
Capital Expenditures:
Design - 50,000
50,000 150,000 -
- - - -
250,000
Right of Way - -
- - -
- - - -
-
Construction - -
- - 1,175,000
- - - -
1,175,000
Total Expenditures: - 50,000
50,000 150,000 1,175,000
- - - -
1,425,000
RES.A
Intersection, Traffic Signal, & Intelligent Transportation Systems I e 117 f Projects 65
o
RES.A
City of Auburn Transportation Improvement Program
IAA N YOU 1MAGI I*l V
Intersection, Traffic Signal, & Intelligent Transportation Systems Improvement f
66
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP #23
Project Title:
Project No:
Project Type:
Project Manager:
Riverwalk Drive SE Non - Motorized Improvements
cpxxxx
Non - Motorized
TBD
STIP# AUB -N /A
LOS Corridor ID# 27
Description:
This project will construct sidewalks, street lighting, and storm improvements on Riverwalk Drive SE between Auburn Way S and Howard Road SE.
Progress Summary:
Design is anticipated to begin in 2016. Construction will be completed when funds are available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,000.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project
Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- 100,000 100,000
- - 500,000
- - -
- - -
- - - -
- - - -
- - - -
- - - -
200,000
500,000
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- 100,000 600,000
- 100,000 -
- - -
- - 600,000
- - - -
- - - -
- - - -
- - - -
700,000
100,000
-
600,000
Total Expenditures: - -
- 100,000 600,000
- - - -
700,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 119 of 146
67
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 24
Project Title:
Project No:
Project Type:
Project Manager:
Academy Drive Multi -Use Trail
cpxxxx
Class 1 Trail (Capacity)
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will use existing Acadamy Dr right -of -way to create a multi -use trail between the Green River Rd and Auburn Way S.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
- - -
- - -
- - -
- - -
42,500 42,500 - -
382,500 382,500 - -
- - - -
- - - -
85,000
765,000
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- - -
- - -
- - -
- - -
425,000 425,000 - -
100,000 - - -
- - - -
325,000 425,000 - -
850,000
100,000
-
750,000
Total Expenditures: - -
- - -
425,000 425,000 - -
850,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 120 of 146
68
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 26
Project Title:
Project No:
Project Type:
Project Manager:
METRO Shuttle: Lakeland Hills Shuttle
NA
Other
Joe Welsh
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Operating costs associated with the Commuter Shuttle from the Lakeland Hills neighborhood to Auburn Station and King County Metro Transit's Route 910.
Progress Summary:
The Lakeland Hills route began in 2009, the community shuttle in 2010. Lakeland Hills Sounder Shuttle is a partnership route with KC Metro and Pierce transit currently
authorized through March 2016. Route 910 is a KC Metro Transit Now Partnership Program funded through October 2015. Funding shown below assumes partnerships
are extended into future years.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - 240,000
240,000 245,000 245,000
250,000 250,000 250,000 -
1,720,000
Unsecured Grant - -
- - -
- - - -
-
REET - -
- - -
- - - -
-
Other (Agencies) - -
- - -
- - - -
-
Total Funding Sources: - 240,000
240,000 245,000 245,000
250,000 250,000 250,000 -
1,720,000
Capital Expenditures:
Design - -
- - -
- - - -
-
RightofWay - -
Transit Service - 240,000
- - -
240,000 245,000 245,000
- - - -
250,000 250,000 250,000 -
1,720,000
Total Expenditures: - 240,000
240,000 245,000 245,000
250,000 250,000 250,000 -
1,720,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 121 of 146
69
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 30
Project Title:
Project No:
Project Type:
Project Manager:
Citywide Pedestrian Accessibility and Safety Program
cpxxxx
Non - Capacity (Annual)
Pablo Para
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund small pedestrian improvement projects at locations throughout the City. Projects are prioritized annually based on pedestrian
demands, existing deficiencies, and citizen requests.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
REET - -
Traffic Impact Fees - -
Other - -
100,000 100,000 100,000
- - -
- - -
- - -
- - -
100,000
-
-
-
-
100,000 100,000
- -
- -
- -
- -
-
-
-
-
-
600,000
-
-
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
100,000 100,000 100,000
15,000 15,000 15,000
- - -
85,000 85,000 85,000
100,000
15,000
-
85,000
100,000 100,000
15,000 15,000
- -
85,000 85,000
-
-
-
-
600,000
90,000
-
510,000
Total Expenditures: - -
100,000 100,000 100,000
100,000
100,000 100,000
-
600,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 122 of 146
70
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 31
Project Title:
Project No:
Project Type:
Project Manager:
Citywide Arterial Bicycle & Safety Improvements
cpxxxx
Non - Capacity (Safety)
Various
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is a bi- annual program to fund bicycle and safety improvements on classified roadways. Projects are prioritized annually based upon field studies. Project was
previously called "Citywide Roadway Safety Infrastructure Improvements ".
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
100,000 - 100,000
- - -
- - -
- - -
-
-
-
-
100,000 -
- -
- -
- -
-
-
-
-
300,000
-
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
100,000 - 100,000
10,000 - 10,000
- - -
90,000 - 90,000
-
-
-
-
100,000 -
10,000 -
- -
90,000 -
-
-
-
-
300,000
30,000
-
270,000
Total Expenditures: - -
100,000 - 100,000
-
100,000 -
-
300,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 123 of 146
71
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
CAPITAL IMPROVEMENT FUND (328)
TIP# 32
Project Title:
Project No:
Project Type:
Project Manager:
Citywide Sidewalk Repairs & Improvements
cp1301
Non - Capacity (Annual)
Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Project funds sidewalk improvements at multiple locations throughout the City. A sidewalk inventory was completed in 2004. Annual projects are selected based upon
criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian corridor or "linkage ", connectivity to transit service, ADA requirements,
and "Save our Streets" (SOS) project locations.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Cap. Imp. Fund Balance - 147,500
Unsecured Grant - -
REET 2 - 200,000
Other - -
25,000 25,000 25,000
100,000 100,000 100,000
200,000 - -
- - -
25,000 25,000 25,000 -
100,000 100,000 100,000 -
- - - -
- - - -
297,500
600,000
400,000
-
Total Funding Sources: - 347,500
Capital Expenditures:
Design - -
RightofWay - -
Construction - 347,500
325,000 125,000 125,000
- - -
- - -
325,000 125,000 125,000
125,000 125,000 125,000 -
- - - -
- - - -
125,000 125,000 125,000 -
1,297,500
-
-
1,297,500
Total Expenditures: - 347,500
325,000 125,000 125,000
125,000 125,000 125,000 -
1,297,500
RES.A
Non - Motorized & Transit Improvement Projects
Page 124 of 146
72
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 44
Project Title:
Project No:
Project Type:
Project Manager:
Downtown Transit Center Access Improvements
cpxxxx
Non - Capacity, Transit
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will modify channelization and curb radii to improve turning radii for transit vehicles at the southwest corner of S Division St & 3rd St SW, and the southeast
corner of A St SW & 2nd St SW.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to minimal.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- 50,000 -
- - - -
50,000
Unsecured Grant - -
- 200,000 -
- - - -
200,000
Traffic Impact Fees - -
- - -
- - - -
-
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- 250,000 -
- - - -
250,000
Capital Expenditures:
Design - -
- 30,000 -
- - - -
30,000
Right of Way - -
- - -
- - - -
-
Construction - -
- 220,000 -
- - - -
220,000
Total Expenditures: - -
- 250,000 -
- - - -
250,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 125 of 146
73
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 56
Project Title:
Project No:
Project Type:
Project Manager:
Evergreen Heights Safe Routes to School Improvements
cpxxxx
Capacity, Non - Motorized
TBD
STIP# AUB -N /A
LOS Corridor ID# 37
Description:
The project will widen S 316th Street from 51st Avenue S to the west of the Evergreen Elementary School frontage, and 56th Avenue S between S 316th Street and S
318th Street. The proposed widening will allow the addition of bike lanes and sidewalks on both sides of the street to match the existing roadway cross - section to the east
of the school. A roundabout will be constructed at the S 316th Street/56th Avenue S intersection replacing the existing all -way stop - control and the school driveway will be
relocated to the west to align with the roundabout. The reconstruction of S 316th Street includes the vertical alignment of the existing roadway along the school frontage
which creates sight- distance problems associated with the school driveways, and at the intersection with 56th Avenue S. Other project elements include undergrounding
of aerial utilities, street lighting, and upgrades to the storm water system.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue - -
- - -
118,500 84,500 693,000 -
896,000
Unsecured Grant - -
- - -
671,500 478,500 3,927,000 -
5,077,000
Traffic Impact Fees - -
- - -
- - - -
-
Other - -
- - -
- - - -
-
Total Funding Sources: - -
- - -
790,000 563,000 4,620,000 -
5,973,000
Capital Expenditures:
Design - -
- - -
790,000 - - -
790,000
Right of Way - -
- - -
- 563,000 - -
563,000
Construction - -
- - -
- - 4,620,000 -
4,620,000
Total Expenditures: - -
- - -
790,000 563,000 4,620,000 -
5,973,000
RES.A
Non - Motorized & Transit Improvement Projects
Page 126 of 146
74
City of Auburn Transportation Improvement Program
AUBURN
RES.A
0 1HAN You AG1NtV
Non - Motorized & Transit Improvement Projects
Page 127 of 146
75
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 1
Project Title:
Project No:
Project Type:
Project Manager:
A Street NW - Phase 1 (3rd St NW to 14th St NW)
c207a0
Capacity
Matt Larson
STIP# AU B -N /A
LOS Corridor ID# 18
Description:
Constructed a new multi -lane arterial from 3rd Street NW to 14th Street NW completing a missing link along the corridor. This project improves mobility and was tied to
corridor development. The project length was approximately three - quarters of a mile. The City purchased ROW from the northern property owner. If the property
develops any access to A ST NW, some or a portion of those funds may be reimbursed to the City (total cost was $251,000).
Progress Summary:
Pre - design was completed prior to 2007. Final design and environmental permitting were completed in 2011.
Construction was completed in 2012. The project is now in
the wetland maintenance monitoring period required until 2023.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,830.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016
2017 2018
2019
2020
2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 123,276 -
-
- -
-
-
- -
123,276
Secured Grants (Fed,State) 6,562,702 -
-
- -
-
-
- -
6,562,702
Traffic Impact Fees 999,953 407,900
25,000
25,000 25,000
25,000
25,000
25,000 150,000
1,707,853
Other (Developer) 383,381 -
-
- -
-
-
- -
383,381
Total Funding Sources: 8,069,312 407,900
25,000
25,000 25,000
25,000
25,000
25,000 150,000
8,777,212
Capital Expenditures:
Design 2,247,331 -
10,000
10,000 10,000
10,000
10,000
10,000 40,000
2,347,331
Right of Way 821,341 -
-
- -
-
-
- -
821,341
Construction 5,000,640 -
-
- -
-
-
- -
5,000,640
Monitoring - 407,900
15,000
15,000 15,000
15,000
15,000
15,000 110,000
607,900
Total Expenditures: 8,069,312 407,900
25,000
25,000 25,000
25,000
25,000
25,000 150,000
8,777,212
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 128 of 146
76
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102), CAPITAL IMPROVEMENT FUND (328)
TIP# 13
Project Title:
Project No:
Project Type:
Project Manager:
Mohawks Plastics Site Mitigation Project
cp0767
Non - Capacity
Jeff Dixon
STIP# AU B -N /A
LOS Corridor ID# N/A
Description:
The project consists of the design, construction, maintenance and monitoring of approximately 2.2 -acres of wetland creation and approximately 0.4 -acres of wetland
enhancement within the Goedecke South Property owned by the Sewer Utility in order to compensate for approximately 1.6 -acre wetland loss on the Mohawk Plastics
property (Parcel # 1321049056). The project was approved under an existing agreement approved by Resolution No. 4196, June 2007.
Progress Summary:
The City received the DOE WQ Certification, WDFW HPA, and on May 7, 2009, the Army Corps of Engineers (Corps) 404 wetland permit (NWS- 2007 - 1913).
Subsequently, bid specifications and construction plans were prepared and construction began in October 2009. Construction was completed in January 2010 and the
project is currently within the 10 -year monitoring period, which involves annual maintenance, monitoring and reporting.
Future Impact on Operating Budget:
It is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a period of 10 years, in
conformance with permit requirements. After the successful conclusion of this 10 -year monitoring period, which is anticipated to be in December 2019, ongoing
operation expenses should be minimal.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Fund Balance - -
- - -
- - - -
-
Unsecured Grant - -
- - -
- - - -
-
Traffic Impact Fees 480,906 25,000
20,000 20,000 65,000
20,000 - - -
630,906
REET 2 (328) 78,283 -
- - -
- - - -
78,283
Total Funding Sources: 559,189 25,000
20,000 20,000 65,000
20,000 - - -
709,189
Capital Expenditures:
Design - -
- - -
- - - -
-
Right of Way - -
- - -
- - - -
-
Construction 559,189 25,000
20,000 20,000 65,000
20,000 - - -
709,189
Total Expenditures: 559,189 25,000
20,000 20,000 65,000
20,000 - - -
709,189
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 129 of 146
77
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 27
Project Title:
Project No:
Project Type:
Project Manager:
A Street SE Safety Improvements Study
cp1110
Safety (Non- Capacity)
James Webb
STIP# AUB -N /A
LOS Corridor ID# 10, 33
Description:
Study the A Street SE corridor between 6th Street SE and Lakeland Hills Way SE including 41st St SE from D St SE to C St SE. The study will review the safety and
access needs of the traveling public and the adjacent properties.
Progress Summary:
In -house pre- design was completed to refine project scope, alignment, and identify design issues. 2015 design will complete conceptual corridor plan for future
improvements.
Future Impact on Operating Budget:
This study will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue 1,230 50,000
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
5,000 - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
56,230
-
-
-
Total Funding Sources: 1,230 50,000
Capital Expenditures:
Design 1,230 50,000
Right of Way - -
Construction - -
5,000 - -
5,000 - -
- - -
- - -
- - - -
- - - -
- - - -
- -
56,230
56,230
-
-
Total Expenditures: 1,230 50,000
5,000 - -
- - - -
56,230
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 130 of 146
78
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 29
Project Title:
Project No:
Project Type:
Project Manager:
S 277th Street - Wetland Mitigation
c410a0
Non - Capacity
Matt Larson
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Wetland mitigation for the S 277th St grade separation project.
Progress Summary:
This is a 10 -year obligation, which began in 2004.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Unrestricted Street Revenue 290,091 50,000
Unsecured Grant - -
Traffic Impact Fees - -
Other 3,804 -
5,000 -
- -
- -
- -
-
-
-
-
-
-
-
-
- -
- -
- -
- -
-
-
-
-
345,091
-
-
3,804
Total Funding Sources: 293,895 50,000
Capital Expenditures:
Design 37,673 -
Right of Way - -
Construction 160,390 -
Monitoring 95,832 50,000
5,000 -
- -
- -
- -
5,000 -
-
-
-
-
-
-
-
-
- -
- -
- -
-
-
-
-
-
-
-
348,895
37,673
-
160,390
150,832
Total Expenditures: 293,895 50,000
5,000 -
-
-
- -
-
348,895
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 131 of 146
79
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 46
Project Title:
Project No:
Project Type:
Project Manager:
104th Avenue SE & Green River Road Study
cpxxxx
Non - Capacity, Safety
James Webb
STIP# AUB -N /A
LOS Corridor ID# 24
Description:
This project funds a pre- design study to determine the right -of -way, environmental and construction requirements for intersection safety improvements. The project is
anticipated to include sight- distance improvements, constructing turn - lanes, channelization, environmental mitigation, signage and clear zone improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Unsecured Grant - -
Traffic Impact Fees - -
Other - -
5,000 - -
- - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
5,000
-
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
5,000 - -
5,000 - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
5,000
5,000
-
-
Total Expenditures: - -
5,000 - -
- - - -
5,000
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 132 of 146
80
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 54
Project Title:
Project No:
Project Type:
Project Manager:
Kersey Way SE Corridor Study
cpxxxx
Capacity
TBD
STIP# AUB -N /A
LOS Corridor ID# 36
Description:
This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The study will develop the scope and costs for
horizontal /vertical geometric roadway improvements, roadside hazard mitigation, street lighting and non - motorized trail construction. The project length is approximately
two miles.
Progress Summary:
Design study will begin in 2016 following the completion of the update to the Comprehensive Transportation Plan.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Unrestricted Street Revenue - -
Grants(Fed,State,Local) - -
Traffic Mitigation Fees - -
Other - -
- - -
- - -
50,000 - -
- - -
- - - -
- - - -
- - - -
- - - -
-
-
50,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
50,000 - -
50,000 - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
50,000
50,000
-
-
Total Expenditures: - -
50,000 - -
- - - -
50,000
RES.A
Preliminary Engineering and Miscellaneous Pro 'ects
Wage 133 of 146
81
RES.A
City of Auburn Transportation Improvement Program
, IRA YOU 1MAGI V
Preliminary Engineering and Miscellaneous Pro "ects
Wage 134 of 146
82
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 7
Project Title:
Project No:
Project Type:
Project Manager:
15th Street SW Reconstruction
cpxxxx
Preservation
TBD
STIP# AUB -N /A
LOS Corridor ID# 12
Description:
This project will evaluate improvements to the Union Pacific at grade rail crossings as well as the vertical sight distance to the Interurban Trail crossing to the west of the
tracks. This project was originally scoped to include pavement preservation. The pavement preservation component could still be combined with this project, but is also
eligible for the Arterial Pavement Preservation Program. A planning level cost estimate is provided.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Arterial Preservation Fund - -
Unsecured Grant - -
Other - -
- -
- -
- -
75,000
300,000
-
500,000
2,500,000
-
- -
- -
- -
-
-
-
575,000
2,800,000
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
Right of Way - -
Construction - -
- -
- -
- -
- -
375,000
375,000
-
-
3,000,000
-
-
3,000,000
- -
- -
- -
- -
-
-
-
-
3,375,000
375,000
-
3,000,000
Total Expenditures: - -
- -
375,000
3,000,000
- -
-
3,375,000
RES.A
Preservation Projects
Page 135 of 146
83
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 22
Project Title:
Project No:
Project Type:
Project Manager:
Lake Tapps Parkway Preservation (City Limit to Lakeland Hills Way)
cpxxxx
Preservation
Jai Carter
STIP# AUB -51
LOS Corridor ID# 17
Description: The Lake Tapps Parkway Preservation project will complete a patch and overlay of pavement between the Auburn /Sumner City limit and Lakeland Hills Way
including all required ADA improvements to curb ramps, sidewalks, and pedestrian signals.
Progress Summary:
Federal grant was awarded in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Fund Balance - -
26,480 176,370 -
- - - -
202,850
Secured Grant - -
97,900 652,100 -
- - - -
750,000
Other - -
- - -
- - - -
-
Total Funding Sources: - -
124,380 828,470 -
- - - -
952,850
Capital Expenditures:
Design - -
124,380 - -
- - - -
124,380
Right of Way - -
- - -
- - - -
-
Construction - -
- 828,470 -
- - - -
828,470
Total Expenditures: - -
124,380 828,470 -
- - - -
952,850
RES.A
Preservation Projects
Page 136 of 146
84
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 28
Project Title:
Project No:
Project Type:
Project Manager:
Annual Bridge Structure Preservation
Various
Non - Capacity, Preservation
Scott Nutter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund improvements to bridge structues identified by the city's annual bridge inspection program.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Cost
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Arterial Preservation Fund - 50,000
Grants (Fed,State,Local) - -
Other - -
50,000 50,000 50,000
- - -
- - -
50,000 50,000 50,000 -
- - - -
- - - -
350,000
-
-
Total Funding Sources: - 50,000
Capital Expenditures:
Design - 5,000
Right of Way - -
Construction - 45,000
50,000 50,000 50,000
5,000 5,000 5,000
- - -
45,000 45,000 45,000
50,000 50,000 50,000 -
5,000 5,000 5,000 -
- - - -
45,000 45,000 45,000 -
350,000
35,000
-
315,000
Total Expenditures: - 50,000
50,000 50,000 50,000
50,000 50,000 50,000 -
350,000
RES.A
Preservation Projects
Page 137 of 146
85
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 35
Project Title:
Project No:
Project Type:
Project Manager:
Arterial Street Preservation Program
varies annually
Non - Capacity, Preservation
Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description: Implement regular pavement maintenance and /or rehabilitation of various classified streets citywide. These projects may include a combination of overlays,
rebuilds, and spot repairs. This program is funded through a 1% utility tax that was adopted by City Council during 2008.
Progress Summary:
The 2015 construction cycle included the completion of the 2014 preservation project and participation in two utility projects in addition to the annual 2015 project.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Arterial Preservation Fund - 4,575,293
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000 -
12,975,293
Secured Federal Grant - -
- - -
- - - -
-
Other (ICON) - 190,000
- - -
- - - -
190,000
Total Funding Sources: - 4,765,293
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000 -
13,165,293
Capital Expenditures:
Design - 100,000
50,000 50,000 50,000
50,000 50,000 20,000 -
370,000
Right of Way - -
- -
-
-
Construction - 4,665,293
550,000 650,000 1,650,000
1,750,000 1,750,000 1,780,000 -
12,795,293
Total Expenditures: - 4,765,293
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000 -
13,165,293
RES.A
Preservation Projects
Page 138 of 146
86
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND FUND (105)
TIP# 36
Project Title:
Project No:
Project Type:
Project Manager:
Annual Arterial Crackseal Program
cpxxxx
Non - Capacity, Preservation
Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing the cracks will prolong the life of the pavement by stopping water
from draining into the sub -base of the road.
Progress Summary:
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Costs
Total Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Arterial Preservation Fund - 100,000
Unsecured Grant - -
Other - -
100,000 100,000 100,000
- - -
- - -
100,000
-
-
100,000 100,000
- -
- -
-
-
-
700,000
-
-
Total Funding Sources: - 100,000
Capital Expenditures:
Design - 10,000
Right of Way - -
Construction - 90,000
100,000 100,000 100,000
10,000 10,000 10,000
- - -
90,000 90,000 90,000
100,000
10,000
-
90,000
100,000 100,000
10,000 10,000
- -
90,000 90,000
-
-
-
-
700,000
70,000
-
630,000
Total Expenditures: - 100,000
100,000 100,000 100,000
100,000
100,000 100,000
-
700,000
RES.A
Preservation Projects
Page 139 of 146
87
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
LOCAL STREET PRESERVATION FUND (103)
TIP# 37
Project Title:
Project No:
Project Type:
Project Manager:
Local Street Improvement Program
Various
Non - Capacity, Preservation
Jai Carter
STIP# AU B -N /A
LOS Corridor ID# N/A
Description:
The program preserves local (unclassified) streets. The work includes crack sealing, asphalt patching, pre - leveling, asphalt overlays and roadway reconstruction.
Beginning in 2013 sales tax on construction was dedicated by council to fund this program.
Progress Summary:
This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on completing reconstruction needs in
addition to regular maintenance treatments.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Local Street Preserv. Fund - 3,218,665
1,600,000 1,600,000 1,600,000
1,600,000 1,600,000 1,600,000 -
12,818,665
Unsecured Grant - -
- - -
- - - -
-
Other - -
- - -
- - - -
-
Total Funding Sources: - 3,218,665
1,600,000 1,600,000 1,600,000
1,600,000 1,600,000 1,600,000 -
12,818,665
Capital Expenditures:
Design - 400,000
300,000 300,000 300,000
300,000 300,000 300,000 -
2,200,000
Right of Way - -
- - -
- - - -
-
Construction - 2,818,665
1,300,000 1,300,000 1,300,000
1,300,000 1,300,000 1,300,000 -
10,618,665
Total Expenditures: - 3,218,665
1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 -
12,818,665
RES.A
Preservation Projects
Page 140 of 146
88
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 57
Project Title:
Project No:
Project Type:
Project Manager:
Bridge Deck Preservation
cpxxxx
Non - Capacity, Preservation
Scott Nutter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund the rehabilitation of bridge decks as identified by the City's annual bridge inspection program.
Progress Summary:
R St SE Stuck River Bridge deck repairs were completed in 2014.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Funding Sources: Prior to 2015 Estimate
Budget
Forecast Project Costs
Total Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Arterial Preservation Fund - -
Utility Tax - -
Bond proceeds - -
100,000 100,000 100,000
- - -
- - -
100,000 100,000 100,000 -
- - - -
- - - -
600,000
-
-
Total Funding Sources: - -
Capital Expenditures:
Design - -
RightofWay - -
Construction - -
100,000 100,000 100,000
- - -
- - -
100,000 100,000 100,000
100,000 100,000 100,000 -
- - - -
- - - -
100,000 100,000 100,000 -
600,000
-
-
600,000
Total Expenditures: - -
100,000 100,000 100,000
100,000 100,000 100,000 -
600,000
RES.A
Preservation Projects
Page 141 of 146
89
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 70
Project Title:
Project No:
Project Type:
Project Manager:
Auburn Way N Preservation (22nd St NE to 45th St NE)
cpxxxx
Non - Capacity, Preservation
Joel Chalmers
STIP# AUB -48
LOS Corridor ID# 1
Description: The project proposes to grind and overlay Auburn Way N from the 22nd Street NE to 45th Street NE. The project will restore 7.3 lane miles of pavement,
upgrade 26 curb ramps to meet current ADA standard, as we as remove unused driveway openings as an upgrade to non ADA compliant pedestrian facilities. The project
funds the design, coordination, permitting, and construction of the pavement preservation project.
Progress Summary:
Federal Grant funding was secured in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Arterial Preservation Fund - 80,000
887,500 - -
- - - -
967,500
Secured Federal Grant - 80,000
887,500 - -
- - - -
967,500
Other - -
- - -
- - - -
-
Total Funding Sources: - 160,000
1,775,000 - -
- - - -
1,935,000
Capital Expenditures:
Design - 160,000
- - -
- - - -
160,000
Right of Way - -
- - -
- - - -
-
Construction - -
1,775,000 - -
- - - -
1,775,000
Total Expenditures: - 160,000
1,775,000 - -
- - - -
1,935,000
RES.A
Preservation Projects
Page 142 of 146
90
City of Auburn Transportation Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL PRESERVATION FUND (105)
TIP# 71
Project Title:
Project No:
Project Type:
Project Manager:
15th Street NE /NW Preservation (SR -167 to 8th St NE)
cpxxxx
Non - Capacity, Preservation
Jai Carter
STIP# AUB -47
LOS Corridor ID# 9
Description: The project proposes to grind and overlay 15th Street NW /NE from the SR167 to Auburn Way N; and grind and overlay Harvey Road NE from Auburn Way N
to 8th Street NE. The project will restore 7.57 lane miles of pavement, upgrade 30 curb ramps to meet current ADA standard, as well as remove unused driveway openings
as an upgrade to non ADA compliant pedestrian facilities. The project funds the design, coordination, permitting, and construction of the pavement preservation project.
Progress Summary:
Federal Grant Funding was securred in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Arterial Preservation Fund - -
67,500 750,000 -
- - - -
817,500
Secured Federal Grant - -
67,500 750,000 -
- - - -
817,500
Other - -
- - -
- - - -
-
Total Funding Sources: - -
135,000 1,500,000 -
- - - -
1,635,000
Capital Expenditures:
Design - -
135,000 - -
- - - -
135,000
Right of Way - -
- - -
- - - -
-
Construction - -
- 1,500,000 -
- - - -
1,500,000
Total Expenditures: - -
135,000 1,500,000 -
- - - -
1,635,000
RES.A
Preservation Projects
Page 143 of 146
91
City of Auburn Transportation Improvement Program
AUBURN
RES.A
001N YOU IAG1[ V
Preservation Projects
Page 144 of 146
92
City of Auburn
2016-2021
Transportation Improvement Program Summary
Project
Number
520750
TP
#
1
project title
A St NW - Phase 1(3rl St NW to 14th St NW)
Grant
Status
Secured
Prior to 2016
8477212
25000
25000
25000
25000
2020
25000
2021
25000
Beyond 2021
156000
Total Project
Cost
8777212
project Category
WetlaW Monitoring
cp1118
2
Auburn Way 5 Petlestrian Improvements (Dogwood St
SE to Fir St SE)
Securetl
1734163
5000
-
-
-
-
-
-
1739163
Roadway
540950
3
Auburn Way Corridor (40, St NEto 4th St SE)
Unsecured
78251
-
-
-
818700
6000800
-
-
3896,951
Roadway
541550
4
I Street NE Corridor(45th St NE to 5 277th St)
Unsecured
3,892
6760,000
6763,892
Roadway
520150
5
M Street Underpass (3rd St SE to 8th St SE)
Secured
22348290
130654
138080
129500
128920
128350
128000
2372800
22359,127
Roadway
522250
6
5 277th Street (AWN to L Street NE)
Secured
1,411,301
6881800
-
-
-
-
-
-
8293,101
Roadway
©pxxxx
7
15th St SW Reconstruction
Unsecured
-
-
-
375000
3,006800
-
-
-
3875000
Preservation
cpxxxx
8
A Street NW, Phase 2(W Main St to 3rd tit NW)
Unsecured
150,000
-
-
-
-
3,000,000
-
-
6150,000
Roadway
cam.
9
Auburn Way 5 Corridor Improvements (Hemlock to
Academy)
Unsecured
-
200,000
-
-
-
-
-
-
260,660
Roadway
CP1416
10
F Street SE (4th St SE to AWS)
Unsecured
407620
250000
1800,000
-
-
-
-
-
2457620
055255y
Spxxxx
11
M Street NE (E MN, St to 4th St NE)
Unsecured
-
-
-
106000
275000
1150,000
-
-
1525000
Roadway
cpssss
12
Grade - Separated Crossing of BASF Railyartl
Unsecured
-
-
-
-
-
-
1,125000
31600000
32125000
Roadway
CP0767
13
Mohawk Plastics Site Mitigation Project
WA
584,189
20000
28000
65000
26000
-
-
-
709,189
Wetland Monitoring
cpxxxx
14
M Street SE/12th Street SE Traffic Signal
Unsecured
-
-
-
-
625000
-
-
-
625000
Intersection, Signal 8
ITS
wawa
15
8th Street NE Widening (Pike St NEW R St NE)
Unsecured
-
-
-
450000
1809000
-
-
-
1459000
Roadway
cpxxxx
16
49th Street NE (Auburn Way North tot St NE)
Unsecured
-
-
-
-
850600
2506000
-
-
3,350,000
Roadway
CP0611
17
Harvey Rd NEiOth NE Intersection Improvements
WA
1817810
85383
85200
84800
84400
84,400
84200
578400
1807793
Intersectio n, Signala
S
cpxxxx
18
M St SE& 29th St SE Intersection Improvements
Unsecured
-
56000
-
-
400600
-
-
-
456000
Intersection, Signal
ITS
Spxxxx
19
Auburn Way Nllst Street NE Signal Improvements
Unsecured
-
50000
-
550000
-
-
-
-
600800
Intersectio n, Signal8
S
cpxxxx
20
R St SE 621st St SE Intersection Improvements
Unsecured
-
75000
-
-
806000
-
-
-
875000
Intersection, Signal a
ITS
CP1406
21
MN, Street Signal Upgrades
Secured
465000
5000
-
-
-
-
-
-
470000
Intersection, Signal
ITS
caw.
22
Lake Tapps Parkway Preservation (City Limit tEl
Lakeland Hills Way)
Unsecured
-
124380
828,470
-
-
-
-
-
952850
Preservation
©paw
23
Riverwalk Drive Non - Motorized Improvements
Unsecured
-
-
100000
600000
-
-
-
-
700000
Non - Motorized
cpxxxx
24
Aatleny Drive Multi Use Trail
Unsecured
-
-
-
-
425000
425600
-
-
850,000
Non - Motorized
wawa
25
46th Place 5 Realignment
WA
-
-
-
-
-
825000
-
-
825000
Roadway
NA
26
METRO Shuttle. Lak&and Hills Shuttle
WA
240000
240000
245000
245000
250000
250000
250000
-
1720,000
Transit
CP1110
27
A Street SE Safety Improvements Study
WA
51,230
5,000
-
-
-
-
-
-
56,230
Study
cp1008
28
Annual Bridge Structure Present on
WA
56000
56000
56000
56000
50000
50000
50000
-
356000
Preservation
541050
29
5 277th Street- Wetland Mitigation
WA
343,895
5000
-
-
-
-
-
-
348,895
Wetland Monitoring
Various
30
Citywide Pedestrian Accessibility and Safety Program
WA
-
100000
100000
100000
100000
100000
100000
-
600000
Non - Motorized
Various
31
Citywide Arterial Bicycle 85afey Imp
WA
-
100,000
-
100,000
100,000
-
-
300,000
Non- Motorised
Various
32
Citywide Sidewalk Repairs and Improvements
WA
347500
325000
125000
125000
125000
125000
125000
-
1297500
Non - Motorized
cpxxxx
33
Neighborhood Traffic Calming Program
WA
100,000
100000
100,000
100,000
100,000
100,000
100,000
-
700,000
Roadway
Various
34
Traffic Signal Improvements
WA
175000
175000
175000
175000
175000
175000
175000
-
1225000
Intersection, Signal8
ITS
Various
35
Arterial Street Preservation Program
WA
4765293
600000
700000
1700000
1800,000
1800,000
1800,000
-
18165293
Preservation
Various
36
Arterial Street Crack Seal
WA
100000
100000
100000
100000
100000
100000
100000
-
700000
Preservation
Various
37
Local Streets Improvement Program
WA
3218665
1600000
1600000
1608000
1600000
1600,000
1600000
-
12818665
Preservation
CP0820
30
C St SW 615th St SW Intersection Improvements
Unsecured
-
-
156000
-
875000
-
-
-
1825000
Intersection, Signal6
ITS
Spxxxx
39
124th Ave SE SSE 320th St Intersection Imp.
Unsecured
-
350000
-
-
1,500,000
_
_
_
1,850,000
0155555155. 5,gna,a
cpxxxx
40
124th Ave SE Corridor Improvements- Phase2
Unsecured
-
-
-
400000
1,100000
2500000
-
-
4000000
Roadway
Sp555
41
R Street Bypass
Unsecured
-
-
-
-
-
-
500000
5700800
6,200,000
Roadway
cpxxxx
42
SE320th St Corridor Improvements
Unsecured
-
100000
-
600,000
662500
3281800
-
-
4644100
Roadway
CP1218
43
Auburn Way 5(50 -164) Corridor Safety Improvements
Secured
544,885
2347665
-
-
-
-
-
-
2,892,550
Roadway
cpxxxx
44
Downtown Transit Center Access Improvements
Unsecuretl
-
-
256000
-
-
-
-
-
256000
Transit
cpxxxx
45
124th Ave SE 8 SE 284th St Intersection Safety
Improvements
Unsecuretl
-
-
100600
600600
-
-
-
-
700,000
Intersection, Signal &
ITS
CP1021
46
104th Ave SE &Green River Road Study
WA
-
5000
-
-
-
-
-
-
5000
Study
Spxxxx
47
Traffic Management Center Improvements
WA
125000
25,000
-
-
-
-
-
-
150600
Intersectio n, Signal
S
cpxxxx
48
Improvements SE and 6th St SE Safety and Access
Improvements
WA
_
50,000
-
-
-
-
-
-
50,000
Intersection, Signal 6
ITS
cpxxxx
49
West Valley Hwy Improvements (15th St NW to W
Main St)
unsecured
-
-
-
106,000
668600
8000,000
-
-
3700,000
Roadway
cpxxxx
50
ITS Dynamic Message Signs
Unsecured
-
150000
150000
150000
150000
150000
-
-
750000
Intersection, Signal6
ITS
cpxxxx
51
Lake Tapps Parkway ITS Expansion
Unsecured
-
105,000
900000
-
-
-
-
-
1005000
Intersectio n, Signal
S
Spxxxx
52
A St SE 8 Lakelantl Hills Way SE Intersection Safety 8
Capacity Improvements
Unsecured
-
75000
-
-
-
-
-
-
75000
Intersection, Signal 8.
ITS
CP1114
53
AWS and 12th Stre SE Intersection Improvements
et
Unsecured
50000
100000
750000
-
_
_
_
_
900000
Intersection, Signal6
ITS
cpxxxx
54
Kersey Way SE Corridor Study
WA
-
56000
-
-
-
-
-
-
56000
Study
CP1415
55
W MN, Street Improvements
Unsecured
950538
8494,400
-
-
-
-
-
-
4,444,938
Roadway
Spxxxx
Evergreen HeigMS Safe Routes to School
Improvements
Unsecured
-
-
-
-
790600
563,000
4,620800
-
5973,000
Non - Motorized
©pxaxe
57
Arterial Bridge Deck Rehabilitation
WA
-
100000
100000
100000
100,000
100000
100000
-
600,000
Preservation
cp1119
58
AW5 Corridor Imp (Fir St SE to Hemlock St SE)
Secured
6466734
5000
-
-
-
-
-
-
6471734
Roadway
cp1023
59
Auburn Ave NE 83rd St NE Pedestrian &Access
Improvements
Unsecured
8,778
-
50000
300600
-
-
-
-
358,778
Intersection, Signal &
ITS
cpxxxx
60
M Street SE Corridor (8th St SE to AWS)
Unsecured
-
-
-
-
1925000
4750600
-
-
6675000
Roadway
cpxxxx
61
AWS Bypass
Unsecured
-
-
-
-
-
5,000,000
10000000
25000000
40,000,000
Roadway
cpxxxx
62
AW 5 Streetsapelmprovenerats (5R- 18 to M St SE)
Unsecured
-
-
-
-
1950000
2800000
-
-
4750000
Roadway
cpxxxx
63
29th St SEIR St SE Intersection Improvements
Unsecured
-
-
-
-
1800,000
-
-
-
1,800,000
Intersection, Signal 6
ITS
cpxxxx
64
Lea Hill Rd Segment 1 (R St NE to 105th PI SE)
Unsecured
480000
100,000
-
-
2450000
10000000
-
-
13030000
Roadway
cpxxxx
65
Lea Hill Rd Segment 2(105* PI SE to 112th Ave SE)
Unsecured
-
-
-
-
-
3500000
8500000
-
12,000,000
Roadway
cpxxxx
66
Lea Hill Rd Segment 3 (112* Ave SE to 124th Ave SE)
Unsecured
-
-
-
-
1600000
3000000
-
-
4000000
Roadway
CP1501
67
Traffic Signal Safety Improvements
Secured
32600
412575
-
-
-
-
-
-
445,175
Intersectio n, Signal
S
CP1502
68
3]* Street SE and A Street SE Traffic Signal Safety
Improvement
Unsecured
211 900
722,600
-
-
-
-
-
-
934,500
Intersection, Signal 8.
ITS
wawa
69
I street NE and 22,2 Street NE Roundabout 5afey
Improvement
Unsecured
50,000
50000
150000
11 75,000
-
-
-
-
1425000
Intersectio Signal8
ITS n,
071507
70
Auburn Way N Preservation (22nd Street NE to 45th
Street NE)
Unsecured
166000
1775000
-
-
-
-
-
-
1935000
Preservation
©p
71
5 *.eet) reef NE/NW PreserwSan )SR -167 to NE 8th
Unsecured
-
135000
1500000
-
-
-
-
-
1635000
Preservation
cpxxxx
72
WW,alley Hwy Improvements (SR-18 to 15th Street
Unsecured
-
-
100,000
500,000
2,500,000
-
-
-
3,100,000
Roadway
©pxxxx
73
Stewart Road (Lake Tapps Parkway)
WA
-
-
100000
-
-
-
109000
Roadway
cpxxxx
74
R St SE Corridor Extension
WA
-
-
-
-
-
2000000
8000000
-
10000000
Roadway
RES.A
Total 52,949,746 21,454,457 10,483,750 10,599,300 38914,520 58182,350 37,382,200 64,795,400 286,533,256
Appendix A
Page 145 of 146
City of Auburn 2016 - 2021 Transportation Improvement Program (TIP)
WASHINCTON
Intersection and ITS Improvements
Preservation
Non-Motorized/Transit Improvements Roadway Improvements
RES.,krelim Eng and Misc Improvements
City of Auburn
Parks
Water Features
Appendix B
Page 146 of 146
0 1.100 2.200 3.300 4.400 5.500
FEET
Printed On 05/19/15
Map II> 4607
Information shown i s for general reference purposes
only and does not necessarily represent exact
geographic or cartographic ...mapped The
City of Auburn makes no warranty as to its accura,