Loading...
HomeMy WebLinkAbout2016-01-01 FEE SCHEDULECITY OF AUBURN FEE SCHEDULE FEES FOR CITY PERMITS, LICENSES, PUBLICATIONS, AND ACTIONS Effective January 1, 2016 A. PLANNING FEES (Per Ordinance No. 5707, Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797, Resolution No. 3953, Resolution No. 4070, Resolution No. 4117, Resolution No. 4143, Ordinance No. 6077, Resolution No. 4272, Resolution No. 4424, Ordinance No. 6276, Resolution No. 4552, Ordinance No. 6295, Resolution No. 4868, Resolution No. 4880, Resolution 4964, Ordinance 6477, Resolution No. 5016,Resolution 5114 and Resolution No. 5181.) $518.00 Non - Residential (includes mixed use projects) $854.00 Boundary Line Elimination 1. Application Fees: Applications for any action identified below shall not be accepted for filing, unless otherwise noted, until the fees per the below schedule have been paid to the City.' Additional Meeting Fee (beyond the specified number) $259.00 per meeting Additional Re- submittal Fee (covers one re- submittal for all land use $63.00 per actions) re- submittal Address Assignment $104.00 per address Administrative Use Permits (covers 1 meeting with staff after which $880.00 additional meeting fees apply) Appeal of Administrative Decision to Hearing Examiner $1,000.00 Binding Site Plan 2 (covers 2 meetings with staff after which additional $1,139.00 + $62.00 /lot meeting fees apply) Boundary Line Adjustment': Residential $518.00 Non - Residential (includes mixed use projects) $854.00 Boundary Line Elimination $500.00 Comprehensive Plan Map Amendments (covers 2 meetings with staff $2,070.00 (includes after which additional meeting fees apply) rezone application fee) Comprehensive Plan Text Amendments (covers 2 meetings with staff $1,000.00 after which additional meeting fees apply) Conditional Use Permits (covers 2 meetings with staff after which additional meeting fees apply) Residential $1,000.00 All Other (includes mixed use projects) $2,000.00 Conditional Use Permits — Minor Adjustment (covers 1 meeting with staff after which additional meeting fees apply) Residential $414.00 All Other (includes mixed use projects) $554.00 Critical Areas Review: Please note that the City of Auburn may collect a review fee on behalf of the Valley Regional Fire Authority for certain land use and /or environmental reviews which fee is collected in addition to the City's required fees. 2 Per Auburn City Code, a modification to an approved binding site plan shall be processed in the same manner as the original binding site plan approval. Therefore, the specified fee shall apply to a new or modified binding site plan approval request. 3 Fees for amendments to text or maps of the Comprehensive Plan apply only where an applicant seeks an amendment affecting specific properties rather than the City generally or property within the City generally. 4 Per Auburn City Code, a major adjustment to an approved conditional use permit shall be processed in the same manner as the original conditional use permit approval. Therefore, the specified fee shall apply to a new request for conditional use permit approval or a request for a major adjustment to a previously approved conditional use permit approval. Page 1 On -site monitoring & reporting (required) of wetlands & other $300.00 /monitoring environmentally sensitive areas5 event Critical Areas Reasonable Use Determination $259.00 City review of environmental studies, plans or reports (whether $259.00 /study, plan or submitted with another city application or not and includes one re- report submittal) Critical Areas Variance — administrative $259.00 Critical Areas Variance — hearing examiner', 6 $1000.00 Current Use Taxation (covers 1 meeting with staff after which $800.00 additional meeting fees apply) Development Agreement — Amendment $2,200.00 + $60.00 /lot or dwelling unit Downtown Urban Center Design Review (covers 1 meeting with staff $1,139.00 after which additional meeting fees apply) Environmental Review (covers 1 meeting with staff after which additional meeting fees apply) SEPA Checklist review' (includes City issuance of DNS, MDNS, or $802.00 + $259.00 DS as appropriate) /required study Revised or Supplemental SEPA Checklist review' (includes City $350.00 + $259.00 issuance of Addendum, if appropriate) /required study SEPA 3rd Party Review Actual costs Environmental Impact Statement $802.00 + actual costs for preparation of draft & final statements including labor, materials, mailing & other actual costs relating to the drafting & circulating of the EIS. Final Plats — Subdivisions (covers 2 meetings with staff after which $1,533.00 + $52.00 /lot additional meeting fees apply and 1 re- submittal) Final Plats — Short Plats (covers 1 meeting with staff after which $750.00 + $25.00 /lot additional meeting fees apply and 1 re- submittal) Flexible Development Alternatives Application Review (covers 1 $1,139.00 meeting with staff after which additional meeting fees apply and 1 re- submittal) Hearing Examiner — Conduct of Hearing and Preparation of Decision 6 Total hourly charge for hearing examiner plus associated expenses to be paid by applicant prior to issuance of final decision Floodplain Development Permit $259.00 Floodplain Habitat Impact Assessment Report Review $250.00 Floodplain Habitat Mitigation Plan Review $250.00 5 For monitoring required over multiple years, the total monitoring fee for the required monitoring period shall be paid prior to final plat approval or issuance of Certificate of Occupancy or release of required financial security. The total cost for the Hearing Examiner is in addition to the relevant application fee for applications requiring a public hearing before the Hearing Examiner (e.g. conditional use permit). Page 2 Combined Floodplain Habitat Assessment/Mitigation Plan Review $500.00 City Acknowledgement Review of FEMA Flood Map Revision $100.00 Application Mining Permits (covers 3 meetings with staff after which additional $3,623.00 meeting fees apply) Miscellaneous Administrative Decisions (i.g. sign area deviation, $500.00 written interpretations, administrative variances) Multi - Family /Mixed Use Design Standards Compliance Review $1,139.00 (application covers 1 meeting with staff after which additional fees apply) Plan Alteration or Vacation 6 (application covers 1 meeting with staff $1,000.00 /request after which additional fees apply) Plat Modification (application covers 1 meeting with staff after which $1,000.00 /request additional fees apply) Preliminary Plats — Subdivisions (application covers 3 meetings with $3,000.00+ staff after which additional fees apply) $120.00 /lot Preliminary Plats — Short Plats (application covers 1 meeting with staff $1,449.00 + $60.00 /lot after which additional fees apply) Preliminary Site Plan Review (non -PUD) (application covers 1 meeting $1,035.00 with staff after which additional fees apply) Pre - application Meeting (application covers 1 meeting with staff after $259.00 — fee will be which additional fees apply) applied towards any related application made within six months of the date the pre - application meeting was held PUD — Major Adjustment (application covers 2 meetings with staff $2,558.00 after which additional fees apply) Public Notice Boards: 2'x 4' public notice board $80.00 4'x 4' public notice board $136.00 Rezone (map amendment) $1,760.00 School Impact Fee Collection: Per Single Family Dwelling Unit $52.00 Per Multi - Family Dwelling Unit $26.00 Shoreline (application covers 1 meeting with staff after which additional fees apply): Shoreline Exemption Determination $215.00 Shoreline Conditional Use Permit6 $1,139.00 Shoreline Substantial Development Permit6 $1,139.00 Shoreline Variance $1,139.00 Short Plat Modification (application covers 1 meeting with staff after $259.00 /requested which additional fees apply) modification Sign Permit $100.00 ' A prior City Code amendment eliminated Planned Unit Developments (PUD). The PUD fees included herein are applicable only to the existing previously approved PUDs. 8 Application fee covers 2 meetings with staff after which additional meeting fees apply. 9 The City collects an application fee to cover the reasonable cost of administration of the school impact fee program. 10 The City collects an application fee to cover the reasonable cost of zoning compliance review in addition to the building permit application fee identified in Table 1 -A, below. Page 3 Site Plan Approval — PUD, Residential (application covers 1 meeting $1,139.00 + $62.00 /lot with staff after which additional fees apply) or unit Site Plan Approval - PUD, Non - residential (application covers 1 $1,139.00 + $62.00 /lot meeting with staff after which additional fees apply) or unit Special Home Occupation Permits $259.00 Three -Party Outside Utility Extension Agreement - Site Specific $1,035.00 + plus the Review (application covers 1 meeting with staff after which additional City's actual costs in fees apply) performing under the terms of the agreement as negotiated between the parties Type I Temporary Use Permit $96.00 + $48.00 per extension request Type 11 Temporary Use Permit $144.00 + $48.00 per extension request Variance (inclusive of Special Exceptions): Per each residence on a single family lot $259.00 All other $575.00 Water /Sewer Certificate (outside of city limits for other than single- $311.00 family) Zoning Certification Letter: Residential $52.00 Non - Residential (includes mixed use development) $104.00 Zoning Code Text Amendment (application covers 1 meeting with staff $1,035.00 after which additional fees apply) 2. BOOKS, MAPS, MATERIALS : (pursuant to Resolution No. 3953) Comprehensive Plan Cost of Production Downtown Plan Cost of Production Downtown Plan Appendices Cost of Production Copies of Codes and Ordinances Cost of Production Maps Cost of Production 3. LAND CLEARING, GRADING AND FILLING FEES (Per Ordinance No. 6146, Resolution No. 4272 and Resolution No. 4424.) Land Clearing: Base Fee (for up to 1 acre) $311.00 1 to 5 acres Base Fee + $114.00 /acre Over 5 acres Base Fee + $83.00 /acre Grading and Filling Fees: Base Fee (for up to 500 cubic yards) $311.00 500 to 250,000 cubic yards Base Fee + $0.12 /cubic yard Over 250,000 cubic yards Base Fee + $0.02 /cubic yard 4. BUILDING FEES (per Ordinance 5715, Ordinance 5819, Resolution No. 3773, Resolution No. 3797, Resolution No. 3818, Resolution No. 3953, Resolution No. 4143, Ordinance No. 6146, Resolution No. 4272, Resolution No. 4424, and Resolution No. 5134.) a. Building Permit Fees: The fee for each International Building Code, International Residential Code, Washington State Energy Code or Washington State Indoor Air Quality Code building permit shall be as set forth in Table 1 -A, below. 12 11 Prices for printed materials do not include any taxes. Page 4 Table 1 -A BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $500.00 $33.00 $501.00 to $2,000.00 $33.00 for the first $500.00 plus $6.00 for each additional $100.00, or fraction thereof, to and including $2,000.00 $3,001.00 to $25,000.00 $133.00 for the first $2,000.00 plus $18.60 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $35,001.00 to $50,000.00 $549.80 for the first $25,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $899.80 for the first $50,000.00 plus $10.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,399.80 for the first $100,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $4,999.80 for the first $500,000.00 plus $8.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,000.00 and up $8,999.80 for the first $1,000,000.00 plus $6.00 for each additional $1,000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours ..................................................................................................... ............................... $63.00 per hour (minimum charge - two hours) 3. Reinspection fees assessed under provisions of Section 109. 4. 13 ..................................................................... ............................... $63.00 per hour 3. Inspections for which no fee is specifically indicated ........................................................................................ ............................... $63.00 per hour (mininmm charge - one half hour) 4. Additional plan review required by changes, additions or revisions to plans ................................................... ............................... $63.00 per hour (mininmm charge - one half hour) 5. For use of outside consultants for plan checking and inspections, or both .................................... ............................... .........................Actual costs FOOTNOTES: 1 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. ' Actual costs include administrative and overhead costs. b. Mechanical Permit Fees: The fee for each permit issued under provisions of the International Mechanical Code, International Fuel Gas Code, NFPA 54 (National Fuel Gas Code), NFPA 58 (Liquefied Petroleum Gas Code), or the mechanical device provisions of the International Residential Code shall be as set forth in Table 2 -A, below. For new single - family dwellings a flat rate permit fee of $185.00 may be charged in lieu of fees as prescribed in Table 2 -A. Table 2 -A MECHANICAL PERMIT FEES Permit Issuance and Heaters: 1. For the issuance of each mechanical permit ..................................................................................................................... ............................... $26.00 3. For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled ........... ............................... $9.00 Unit Fee Schedule (Note: The following do not include permit- issuing fee.) 1. Furnaces: For the installation or relocation of forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance up to and including 1000,000 Btu /h ( 39. 3kW) .................................................................. ............................... $18.00 For the installation or relocation of forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h (39.3kW) ........................................................................................... ............................... $33.00 For the installation or relocation of each floor furnace, including vent ...................................................................... ............................... $18.00 For the installation or relocation of each suspended heater, recessed wall heater or floor - mounted unit heater ...... ............................... $18.00 3. Appliance Vents: For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit ...................... $9.00 3. Repairs or Additions: For the repair of, the alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, 12 Please note that the City of Auburn may collect a review fee for the Valley Regional Fire Authority for certain permit applications that is collected in addition to the City's required fees. Page 5 absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code ............................................................................................................... ............................... $16.00 4. Boilers, Compressors and Absorption Systems: 2. For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW) or each absorption ............................... $12.00 system to and including 100,000 Btu /h (29.3 kW) ....................................................................................................... ............................... $18.00 For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) to and 1. including 15 horsepower (52.7 kW),or each absorption system over 100,000 Btu /h (29.3 kW) to and including 500,000 Btu /h (146.6 kW) ............................................................................................................................. ............................... $31.00 For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) to and including 2. 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu /h (146.6kW) to and including ............................... $19.00 1,000,000 Btu /h (293.1kW) ............................................................................................................................................ ............................... $41.00 For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) to and 4. including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu /h (293.1 kW) to ............................... $9.00 and including 1,750,000 Btu /h (512.9 kW) ................................................................................................................... ............................... $62.00 For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1.750.000 Btu /h (512.9 kW) ........................................................................................ ............................... $102.00 5. Air Handlers: For each installation, alteration or repair or water piping and /or water treatment, each ............................................. For each air handling unit to and including 10,000 cubic feet per minute (cfin) (4719 L /s), including ducts 7. attachedthereto ............................................................................................................................................................... ............................... $12.00 Note: This fee does not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling system, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air - handling unit over 10,000 cfin (4719 L /s) ............................................................................................... ............................... $22.00 6. Evaporative Coolers: For each evaporative cooler other than a portable type ................................................................................................ ............................... $12.00 7. Ventilation and Exhaust: For each ventilation fan connected to a single duct ................................................................................. ............................... ..........................$9.00 For each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit ......................... $12.00 For the installation of each hood which is sensed by a mechanical exhaust, including the ducts for each hood ..... ............................... $12.00 8. Incinerators: For the installation or relocation of each domestic -type incinerator ........................................................................... ............................... $22.00 For the installation or relocation of each commercial or industrial -type incinerator ................................................. ............................... $18.00 9. Miscellaneous: For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories or for which no other fee is listed in the table ............................................................................ ............................... $12.00 Other Inspections and Fees: 1. Inspections outside of normal business hours, per hour (mininmm charge -- two hours) ........................................... ............................... $63.00 2. Reinspection fees assessed under provisions of Section 109.4.13 .... $61.003. Inspections for which no fee is specifically indicated, per hour (mininmm charge -- one -half hour) ..................................................................................................................................... ............................... $63.00 3. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (mininmm charge -- one -half hour) ................................................................... ............................... $63.00 Or the total cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. c. Plumbing Code Permit Fees: For new single - family dwellings a flat rate permit fee of $185.00 may be charged in lieu of fees as prescribed in Table 3 -A. Table 3 -A PLUMBING PERMIT FEES Permit Issuance: 1. For issuing each permit ............................................................................................................................................... ............................... $24.00 2. For issuing each supplemental permit ......................................................................................................................... ............................... $12.00 Unit Fee Schedule (in addition to items I and 2 above): 1. For each additional plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and backfiow protection therefore) ......................................................................... ............................... $9.00 2. For each building sewer and each trailer park sewer ................................................................................................... ............................... $19.00 3. Rainwater systems - per drain (inside building) ............................................................................................................ ............................... $9.00 4. For each water heater and/or vent .................................................................................................................................. ............................... $9.00 5. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen -type grease interceptors functioning as fixture traps ........................................................................... ............................... $9.00 6. For each installation, alteration or repair or water piping and /or water treatment, each ............................................. ............................... $9.00 7. For each repair or alteration of a drainage or vent piping, each fixture ....................................................................... ............................... $9.00 Page 6 8. For each lawn sprinkler system on any one meter including backflow protection devices therefore ............................... ..........................$9.00 9. For atmospheric -type vacuum breakers not included in item 13: 1 to 5 ............................................................................................................................................................................. ............................... $6.00 over5, each .................................................................................................................................................................. ............................... $3.00 10. For each backflow protective device other than atmospheric type vacuum breakers: 3 inch (51 mm) diameter and smaller ....................................................................................................................... ............................... $33.00 over3 inch (51 mm) diameter ................................................................................................................................... ............................... $41.00 11. For initial installation and testing for a reclaimed water system ............................................................................... ............................... $35.00 13. For each annual cross - connection testing of a reclaimed waster system (excluding initial test) ............................ ............................... $35.00 13. For each medical gas piping system sensing one to five inlet(s) /outlet(s) for a specific gas .................................... ............................... $57.00 14. For each additional medical gas inlet(s) /outlet(s) ................................................................................. ............................... ..........................$6.00 Other Inspections and Fees: 1. Inspections outside of normal business hours ............................................................................................................. ............................... $63.00 2. Reinspeetion fee ............................................................................................................................................................ ............................... $63.00 3. Inspections for which no fee is specifically indicated ............................................................................................... ............................... $63.00 4. Additional plan review required by changes, additions or revisions to approved plans (mininnum charge - one -half hour) ................ $63.00 *Per hour for each hour worked or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of all the employees involved. Fees: Permit fees shall be assessed in accordance with this section. Fees specified shall be adjusted for inflation each year based upon the Seattle Consumer Price Index. Fees shall be rounded down to nearest whole dollar. Appeal Fees: The fee for appeals of codes adopted pursuant to ACC Chapter 15 shall be $110.00 plus total hearing examiner costs. Plan Review Fees: When submitted documents are required by Section 106.3 of the Construction Administrative Code, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be 65 percent of the building permit fee as shown in Table 1 -A. The plan review fees specified in this section are separate fees from the permit fees and in addition to permit fees. Temporary Certificate of Occupancy Fees: There shall be a fee equal to ten percent of the building permit fee for issuance of a temporary certificate of occupancy. 5. ADMINISTRATIVE PROCEDURES AND MISCELLANEOUS INSPECTIONS: In addition to any other fees specified in this chapter, there shall be a fee schedule for certain administrative procedures not otherwise included as set forth in the following schedule of fees: Adult Family Home Inspection $160.00 Demolition, permit and inspections Per Table 1 -A Relocation (pre- inspection) Per Table 1 -A Housing Inspection Actual City Cost, minimum $21.00 Change of Use Per Table 1 -A Sign Permits Unless except by Ch. 18.56 ACC, the fee shall accompany each application for a sign permit. The amount of the fee shall be based upon the value of the sign pursuant to Table 1 -A. 6. RENTAL HOUSING BUSINESS LICENSE FEES (Per Resolution No. 4601, Ordinance No. 5882, Resolution No. 4272, Resolution No. 4424 and Ordinance 6477): a. The fee for a license to operate rental housing businesses in the City, as defined in Chapter 5.22 of the Auburn City Code (ACC) shall be based on the total number of units as follows: One to four dwelling units $53.00 /year Five to 24 dwelling units $106.00 /year Page 7 Twenty -five or more dwelling units $212.00 /year Communal residence $150.00 /year b. The fee for a license to operate rental housing businesses in the city shall be for the license year from January 1 to December 31, and each applicant must pay the full fee for the current license year or any portion thereof during which the applicant has engaged in the operation of rental housing businesses. c. The rental housing business license fee required by this chapter is in lieu of, and not in addition to, the general business license fee required by Chapters 5.05 and 5.10 of the Auburn City Code (ACC); provided, however, that any person required to obtain a rental housing business license must also obtain a general business license, at no cost, pursuant to Chapters 5.05 and 5.10 of the Auburn City Code (ACC). d. Notwithstanding the provisions of sub - section (1) of this section, the fee for operating rental housing facilities for any single individual, partnership, corporation or entity shall not exceed $424.00 per license period. Rental housing business license renewals shall be for the period January 1 through December 31 of each year. B. ENGINEERING AND PUBLIC WORKS FEES 1. Transportation Impact Fee Rate Schedule: (Per Ordinance No. 5763 as amended by Resolution No. 3953, Ordinance No. 6005, Resolution No. 4103, Resolution No. 4424, Resolution 4964, Resolution No. 5114 and Resolution No. 5181.) Land Use ITE Land Use Code Independent Variable Trip Rate Non - Downtown Fee Rate Downtown Fee Rate Industrial General Light Industrial 110 sf /gfa 0.97 $7.59 - General Heavy Industrial 120 sf /gfa 0.68 $5.96 - Industrial Park 130 sf /gfa 0.85 $6.65 - Manufacturing 140 sf /gfa 0.73 $3.43 - Warehousing 150 sf /gfa 0.32 $3.51 - Mini- Warehouse /Storage 151 sf /gfa 0.26 $1.87 - Residential Single - Family (detached) 210 du 1.00 $4,295.41 $3,479.28 Multi - Family 220 -233 du 0.62 $2,815.34 $2,280.42 Mobile Home 240 du 0.59 $2,027.43 $751.53 Senior Housing 251,252 du 0.27 $927.81 - Lodging Hotel 310 room 0.60 $2,945.42 $2385.79 Motel 320 room 0.47 $2,307.25 - Recreational Movie Theater 444, 445 seat 0.08 $191.94 $142.04 Health Club 492,493 sf /gfa 3.53 $10.07 $7.45 Page 8 Land Use Institutional Elementary School Middle School /Jr. High High School Church Day Care Center Library Medical Hospital Asst. Living, Nursing Home Office General Office Medical Office Post Office Retail Free Standing Discount Superstore Free Standing Discount Store Hardware /Paint Store Shopping Center Car Sales - New Car Sales - Used Automobile Parts Sales Tire Store Supermarket Convenience Market Home Improvement Store Drugstore w/o Drive - Through Drugstore w/ Drive - Through Furniture Store Page 9 ITE Land Use Code 520 522 530 560 565 590 610 254,620 Independent Variable student student student sf /gfa sf /gfa sf /gfa sf /gfa bed Trip Rate 0.15 0.16 0.13 0.55 12.34 7.30 0.93 0.22 Non - Downtown Fee Rate $250.36 $424.14 $472.25 $2.50 $22.72 $11.42 $4.57 $755.99 Downtown Fee Rate $185.27 $313.87 $349.47 $1.85 $16.81 $8.45 $3.70 710, sf /gfa 1.49 $8.39 $5.71 715,750 720 sf /gfa 3.57 $15.77 $10.73 732 sf /gfa 11.22 $17.56 $11.94 813 1 sf /gla 1 4.35 1 $8.07 1 $5.97 815 sf /gla 4.98 $10.65 $7.88 816 sf /gla 4.84 $7.47 $5.53 820 sf /gla 3.71 $6.31 $4.97 841 sf /gla 2.59 $11.70 $8.66 N/A space 0.28 $1264.57 $935.78 843 sf /gla 5.98 $7.11 $5.26 848 sf /gla 4.15 $8.07 $5.97 850 sf /gla 9.48 $15.64 $11.57 851 sf /gla 52.41 $32.61 $24.13 862 sf /gla 2.33 $3.12 $2.31 880 sf /gla 8.40 $8.24 $6.10 881 sf /gla 9.91 $10.55 $7.80 890 sf /gla 0.45 $0.44 $0.33 Page 10 ITE Land Use Independent Trip Non - Downtown Downtown Fee Land Use Code Variable Rate Fee Rate Rate Services Drive -in Bank 912 sf /gfa 24.30 $23.71 $17.54 Quality Restaurant 931 sf /gfa 7.49 $17.50 $12.95 High Turnover 932 sf /gfa 9.85 $15.85 $11.73 Restaurant Fast Food Restaurant 933 sf /gfa 26.15 $32.74 $24.22 w/o Drive - Through Fast Food Restaurant 934 sf /gfa 32.65 $40.87 $30.25 w/ Drive - Through Espresso Stand w/ 938 sf /gfa 75.00 $31.30 $23.16 Drive - Through Auto Care Center 942 sf /gfa 3.11 $5.88 $4.35 Service Station 944 vfp 13.87 $16,783.79 $12,420.00 Service Station w/ 945 vfp 13.51 $12,402.05 $9,177.52 Mini -Mart Lakeland PUD(Per Ordinance No. 4867 as amended by Resolution No. 2955, Ordinance No. 6176 and Resolution No. 5181.) Detached Single - Family Residential N/A du n/a $1,251.43 - Unit Attached Single - Family /Multi - Family N/A du n/a $812.26 - Unit Senior - Family Unit N/A du n/a $279.12 - Commercial /Retail N/A sf /gfa n/a $3.25 - Units Notes: A. Basic trip rates are based on the ITE Trip Generation Manual, 9th Edition. B. Impact fee rate calculation is based upon the following methodology: — Basic Trip Rate = PM Peak Hour Trip Generation (per unit of measure) — Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x Per Trip Fee /(divide by) 1,000 for rate per square foot (where applicable) = Impact Fee Rate (per unit of measure) C. For land uses not specifically identified here, trip generation rates could be derived from ITE or a special study by the applicant. D. sf /GFA= Square feet Gross Floor Area; sf /GLA= Square Feet Gross Leasable Area; VFP= Vehicle Fueling Position. E. Projects eligible for the Downtown Fee Rate are those located entirely within the boundary identified on Figure 1. Page 10 2. Truck - Dependant Land Use Supplementary Transportation Impact Fee Rate Schedule: (Per Resolution No. 4122, Resolution No. 4424 and Resolution No. 5181.) Land Use ITE Land Use Code Independent Variable Truck Trip Rate Impact Fee Rate (per sf) Industrial Light Industry /Manufacturing 110, 130, 140 sf /gfa $0.06 $0.11 Heavy Industry 120 sf /gfa $0.04 $0.09 Retail Shopping Center 820 sf /gla $0.01 $0.01 Car Sales 841 sf /gfa $0.09 $0.16 Supermarket 850 sf /gfa $0.33 $0.64 Free - Standing Discount Store 813, 815, 861, 863, 864 sf /gfa $0.10 $0.19 Home Improvement Store 862 sf /gfa $0.37 $0.70 Page 11 ITE Land Independent Truck Impact Fee Rate Land Use Use Code Variable Trip Rate (per sf) Services Restaurant 931,932 sf /gfa 0.63 $1.20 Fast Food Restaurant 1933,934 1 sf /gfa 1 2.87 $5.51 Notes: A. ITE Land Use Code based on ITE Trip Generation, 9th Edition B. Impact fee rate calculation is based upon the following methodology: - Truck Trip Rate = Daily Truck Trip Generation (per unit of measure) - Truck Trip Rate x Per Trip Fee = Impact Fee Rate (per unit of measure) C. For land uses not specifically identified in the table, trip generation rates could be derived from a special study by the applicant. D. sf /gfa= square feet of gross floor area 3. Impact Fees By Land Use - Revenue Credit = 20% (Per Ordinance No. 5977, Resolution 3953, and Resolution No. 4022) Land Use Total Fire & EMS Adjustment Fire and EMS Cost per Unit of (Revenue Credit) Impact Fee per Development at 20% Unit of Development Residential - All calculations below are per dwelling unit - Total x Number of Units Single Family, Duplex, Mobile $362.66 $72.53 $290.13 Home Multi - Family $383.09 $76.62 $306.47 Non - Residential - All calculations below are per square foot - Total x Square Feet Hotel /Motel $0.53 $0.11 $0.42 Hospital /Clinic $1.05 $0.21 $0.84 Group Living $2.63 $0.53 $2.10 Office $0.29 $0.06 $0.23 Retail $0.62 $0.12 $0.50 Restaurant/Bar /Lounge $1.62 $0.32 $1.30 Industrial /Manufacturing $0.11 $0.02 $0.09 Leisure /Outdoors $1.08 $0.22 $0.86 Page 11 Agriculture $0.71 $0.14 $0.57 Church $0.38 $0.08 $0.30 Schools /Colleges $1.07 $0.21 $0.86 Government/Public Buildings $1.81 $0.36 $0.86 Casino $3.78 $0.77 $3.01 Jails $21.99 $4.40 1 $17.59 4. Facility Extension Fees: (Per Ordinance No. 5791 and amended by Ordinance No. 5819, Resolution No. 3953, Resolution No. 4272, Resolution No. 4424 and Resolution No. 5114.) The Facility Extension Application Fee is $552.00, plus $167.00 for each Facility (Water, Sanitary Sewer, Storm Drainage, Street, private street and private storm systems within private streets). Facility Extension Fees are the summation of the following categories (a +b +c +d), or $1,660.00, whichever is greater. a. For the combined linear footage of water, sewer, storm drainage and private storm drainage within private streets: The first 0 lineal feet (LF) to 1000 LF is charged at $5.50 per LF plus, The next 1001 LF to 2500 LF is charged at $2.80 per LF plus, Any additional over 2500 LF is charged at $1.65 per LF. b. For the linear footage of streets and private streets: The first 0 LF to 500 LF will be charged at $6.90 per LF plus, The next 501 LF to 1000 LF will be charged at $4.10 per LF plus, Any additional over 1000 LF will be charged at $1.10 per LF. c. For non - linear extensions such as pump stations or traffic signals, the extension fee will be determined by the City Engineer based on an estimate of the City's labor Cost associated with the plan review, inspection, and administration of the application. d. For that portion of the water or sewer facility located outside City Limits, but within existing County (King or Pierce) right -of -way, an additional fee of $444.00 plus $5.00 per LF of the combined water and sewer extension located in the existing County right -of -way applies. Facility Extension Fees will be paid as follows: a. Forty percent (40 %) at the time of execution of the facility extension agreement. b. Sixty percent (60 %) upon the City's approval of the construction drawings and prior to the start of construction. Additional Review: Each additional plan review beyond a 3 d review prior to plan approval will require an additional fee of $512.00 be paid at the time of the additional review submittal. If the review requires more then 8 hours of staff time to complete an additional fee of $64.00 per hour will be charged and must be paid prior to plan approval. Additional plan review required by changes, additions or revisions to plans during construction will require an additional fee of $256.00 be paid at the time the additional review is submitted and prior to any review being completed. If the review requires more than 4 hours of staff time to complete an additional fee of $64.00 per hour will be charged and must be paid prior to plan approval. Page 12 5. Right -of Way Use Permit Fees: (Per Ordinance No. 6125) Type A — Banner $30.00 Type B — Short Term $60.00 Type C — Long Term $100 for the 1St year / $30 for each additional year Type D — Hauling $100.00 + estimated staff time @ $50 per hour Street Closure — Type B or C $90.00 Sidewalk Closure — Type B or C $60.00 Parking Closure — Type B or C $60.00 6. Franchise Agreements: (Per Ordinance No. 6546 and Resolution No. 5114) Application /Renewal Application Fee (ACC $5,000.00 Nonrefundable Initial Fee + plus 13.36.040, ACC 20.06.120, ACC 20.06.130) the City's actual costs incurred in excess of $5,000.00. Initial Fee is due at time of application any additional costs beyond the initial fee is due prior to the effective date of the agreement. Annual Administration Fee (ACC 20.04.170) Actual City Costs Annual CATV Franchise Fee (ACC 13.36.230) 5% of Gross Revenue for the prior three months. Other Annual Franchise Fee (ACC 20.06.100) Statutorily Permissible Percent of Gross Revenue 7. Public Way Agreements: (Per Ordinance No.6546, Resolution No.5114) Application /Renewal Application Fee (ACC $5,000.00 nonrefundable Initial Fee + plus 20.04.020, ACC 20.04.120) the City's actual costs incurred in excess of $5,000.00. Initial Fee is due at time of application any additional costs beyond the initial fee is due prior to the effective date of the agreement. Annual Fee (ACC 20.04.170) Actual City Costs 8. Right -of -Way Vacations: (Per Resolution No. 4143 and Resolution No. 5114.) Application Fee $1,500.00 Land Value Compensation Per ACC 12.48.085 9. Utility System Development Fees: (Per Ordinance No. 5819 and amended by Resolution No. 3797, Resolution Nov 3953, Resolution No. 4272, Resolution No. 4424, Resolution No. 5114, Resolution No. 5134 and Resolution No. 5181.) For all utilities, a charge in lieu of assessment or payback charges may be applicable for the proportional share of the utility line being connected to. Page 13 a. Water Utility: Connection fees are comprised of a Water Service Installation Permit Fee and the Svstem Development Charae as follows: Meter Size (In Inches) Water Service Installation Permit Fee System Development Charge (SDC) Existing Water Service & Meter Box* Water Service & Meter Box Installed by City ** Paved Street Unpaved Street 3/ or less $290.00 $2,250.00 Actual Cost $6,423.00 1 $350.00 $2,450.00 Actual Cost $6,423.00 1 -1/2 $550.00 $3,350.00 Actual Cost $21,387.00 2 $680.00 $3,600.00 Actual Cost $34,232.00 3 Actual Cost Actual Cost Actual Cost $68,528.00 4 Actual Cost Actual Cost Actual Cost $107,063.00 6 Actual Cost Actual Cost Actual Cost $214,063.00 8 Actual Cost Actual Cost Actual Cost $342,514.00 10 Actual Cost Actual Cost Actual Cost $492,415.00 *Installation of a water meter done by the City and the service either already exists or has been installed by the developer. * *Installation of the entire water service is done by the City. If meter installation or retrofit involves installation of a fire sprinkler line, fee is Actual Cost. b. Sanitary Sewer Utility: Connection fees are comprised of a permit Fee and the System Development Charae as follows: Type Permit Fee System Development Charge (SDC)* Existing Sewer Stub New Service Line Required Single Family Parcel $88.00 $155.00 $2,383.00 Per Parcel Other Parcels $88.00 $155.00 $2,383.00 Per RCE ** Side sewer repair on private property $62.00 Side sewer repair in right -of -way 1 $105.00 *Except that for multifamily residential units with separate water meters for each family unit, the sewer utility systems development charge will be calculated as one RCE per family unit. ** RCE, Residential Customer Equivalent - an RCE shall be as defined by the King County Department of Natural Resources. In addition to City sanitary sewer connection fees, there shall be a sanitary sewer connection fee (King County Capacity Charge) imposed by King County to pay Capital Improvement fees to King County per the King County Rate Schedule. c. Storm Drainage Utility: (Per Resolution No. 4566 and amended by Resolution No. 5181) Connection fees are comprised of a Permit Fee and the System Development Charge as follows: SYSTEM DEVELOPMENT CHARGE (SDC) Type System Development Charge (SDC) Single Family Residence & Duplexes (on Individual Parcels) $1,190.00 per Parcel Other Parcels $1,190.00 per ESU* *ESU, Equivalent Service Unit - A configuration of development of impervious surfaces estimated to contribute an amount of runoff to the City's storm drainage system which is approximately equal to that created by the average single family residential parcel. One ESU is considered equal to 2,600 square feet of parcel coverage by impervious surfaces. Per ACC 13.48.010. Page 14 When calculating the total SDC, a credit will be applied for the existing impervious area (New total SDC minus calculated SDC for existing impervious area using the new definition of impervious surface as given in ACC 13.41.010). STORM PERMIT FEE Permit Level ** Permit Fee Level 1 $210.00 Level 2 $400.00 Level 3 Base Fee + the Cumulative Additional Fees as indicated below: Refundable Deposit — Hydrant Meter with RPBA, Valve, and Wrench 13 Base Fee = $1,440.00 for up to 10,000 SF of disturbed area Water Main Extension Purity Test Fee Cumulative Additional Fee #1 = Base Fee + $400.00 for 10,001 SF up to 43,560 SF (1 Water Meter Test Fee, 2" or less Acre) of disturbed area Water Meter Test Fee, greater than 2" Cumulative Additional Fee #2 = Cumulative Additional Fee #1 + $100.00 per Acre for Storm Drainage Repair Permit — Private System on Private Property each additional disturbed Acre over 1 Acre * *Permit levels are determined as follows: Level 1 permits are for all projects that are not located in a Critical Area and add or replace less than 2,000 square feet of impervious surface area; and /or disturb less than 7,000 square feet of land. • Level 2 permits are for all projects that add or replace 2,000 to 4,999 square feet of impervious surface area; or disturb 7,000 square feet or more of land. • Level 3 permits are for all projects that add 5,000 square feet or more of impervious surface area, or convert 3/ acres or more of native vegetation to lawn /landscaped area, or convert 2.5 acres or more of native vegetation to pasture, or the new plus replaced impervious surface area is 5,000 square feet or more and the value of improvements exceeds 50% of the assessed value of existing improvements. 10. Other Utility Fees: (Per Ordinance No. 5819, Ordinance No. 5944, Resolution No. 3797, Resolution No. 3953. Resolution No. 4424. Resolution No. 5114 and Resolution No. 5134.) Fire Service Line Permit (5 3 -inch fire service line) $135.00 Hydrant Permit and Inspection Fee $238.00 Hydrant Meter Monthly Rate $44.85 Fire Hydrant Meter Wrench — Refundable Deposit 13 $38.00 Refundable Deposit — Hydrant Meter with RPBA, Valve, and Wrench 13 $1,965.00 Water Main Extension Purity Test Fee $181.00 Water Meter Test Fee, 2" or less $217.00 Water Meter Test Fee, greater than 2" At Actual Cost Storm Drainage Repair Permit — Private System on Private Property $31.00 Storm Drainage Repair Permit — System in Public Right -of -Way /Easement $57.00 Payback Administration Fees: (per Ordinance No. 5954) Application Fee $500.00 Processing Fee $1,000.00 Area of Special Benefit Analysis $500.00 Transaction /Collection Fee $300.00 Outside Professional Services Time & Materials Convenience shut off $25.00 Delinquent shut off $25.00 Late charge 1 % per month of outstanding bill 1' If the equipment is not returned or is returned in a damaged condition, the deposit amount shall be forfeited. Page 15 Page 16 or $15.00 minimum, whichever is greater Unauthorized turn on /off $60.00 Delinquent meter pull $65.00 Unauthorized fire line or water hook up $100.00 a day fine from date of discovery Returned checks each $20.00 Refusal of access per day $30.00 Closing final read $30.00 New account setup $25.00 Bill tenant $25.00 After -hours water turn on /off $30.00 Escrow estimates $25.00 11. Construction Permits: (Per Ordinance No. 5817, Resolution No. 3953, Resolution No. 4272, and Resolution No. 4424.) Basic Fee (BF) $150.00 Hourly Inspection Rate (HIR): Normal Business Hours $52.00 After Hours (includes weeknights, weekends, and holidays and will be $80.00 charged at the after hours HIR x the duration of the work For Excavation Type Work: Length of Excavation (feet) Additional Fee (AF) 31 — 100 feet of excavation length $52.00 101 — 250 feet of excavation length $155.00 251 — 500 feet of excavation length $259.00 501 — 750 feet of excavation length $362.00 751 — 1000 feet of excavation length $466.00 Fee Calculation: Permit Fee = BF + AF (for the appropriate length of excavation) If the excavation exceeds 1,000 linear feet Permit Fee = BF + $466.00 + (HIR x (length of excavation — 1000/100) For Non - Excavation Type Work: This work includes any work in the public right -of -way that is not covered by any other permits and includes such things as overhead utility work, geotechnical borings, horizontal directional drilling and vault installation. Permit Fee = BF + (HIR x Permit Duration in Days) In Lieu of Fee: In lieu of the above standard rates, the city engineer or his /her designee may calculate the fee based upon current labor rates for administrative and inspection staff after developing an estimate of staff effort involved. For projects that are expected to involve significantly more than 1,000 feet of street excavation or when the scope or duration cannot be accurately estimated, the city engineer may establish a deposit account to manage permitee deposits in advance of permit issuance for reimbursing actual labor costs of administering the permit. Such deposit accounts will not be interest bearing and will be closed at the end of the permitted work when a final accounting of the permit administration cost shall be calculated and a final bill or credit issued to the permitee. Page 16 12. Memorial Sign Program: (Per Ordinance No. 6137, and Ordinance No. 6149) Memorial Sign 1 $150.00 13.Special Permits: (Per Ordinance No. 5817 and amended by Resolution No. 3953, Resolution No. 4272 and Resolution No. 4424.) Permit Type Base Fee Additional Per Linear Foot Sidewalk $54.00 $1.10 /foot for each foot over 25 linear feet Residential Driveway $54.00 $1.65 /foot for each foot over 20 linear feet* Commercial Driveway $107.00 $2.20 /foot for each foot over 48 linear feet* *Driveway widths are based on the width of the driveway apron in the right -of -way. 14. Street Payback Agreements: (Per Ordinance No. 6319 and Resolution No. 4624.) Application Fee $500.00 Processing Fee $1,000.00 Assessment Reimbursement Area Analysis $1,000.00 Transaction /Collection Fee $300.00 Outside Professional Services (when needed) Time and Materials Page 17 C. ANIMAL LICENSING FEES AND PENALTIES (Per Resolution No. 4868): 1. Animal License Fees Type Comments Cost Juvenile 8 weeks to 6 months of age $15.00 Altered Unaltered Senior Proof of spay /neuter required Proof that pet is altered and proof that owner is 62 years of age or older consistent with ACC 13.24 is required. $30.00 $60.00 $15.00 Disabled Proof that pet is altered and proof of disability required $15.00 Service Animal Replacement Tag 2. Late Payment Penalty With a signed statement, on the City Form, indicating that the owner of the animal has a disability and that the animal is a service animal, no license fee shall be charged by the City. $0 $5.00 Days Past Expiration Type Additional Cost 45 -90 Late Fee $15.00 91 -135 Late Fee $20.00 136 -364 Late Fee $30.00 365 or more Late Fee $30.00 + prior year's license fee Page 18 D. AUBURN MUNICIPAL AIRPORT FEES (Per Ordinance No. 5707, amended by Ordinance No. 5715 and Ordinance No. 5819, and amended by Resolution No. 3784, Resolution 3797, Resolution No. 3841, Resolution No. 3953, Resolution No. 4117, Resolution No. 4270, Resolution No. 4414, Resolution 4734, Resolution No. 4880, Resolution No. 5016, Resolution No. 5114, and Resolution No. 5181) 1. Lease Fees Lease Type: 194. 00224. 00310. 00420. 0070.00114.00101.00122.00155.00 Open Single Open Twin Closed R -2 Closed R -9 & 10 Outside Tiedowns Storage Rows 3 -8 Storage Units (185 sq. ft. — Buildings 9,10) Storage Units (298 sq. ft.) Storage Units (380 sq. ft. — Buildings 9,10) The West End Hangars located on Hangar rows 9 and 10 have an additional 298 square feet each. There shall be an additional $110.00per month surcharge for the additional space. A security surcharge of $5.00 per month is charged, in addition to the base monthly rental fees provided in this section, for each tie -down, each hangar door and each storage rental area, which security surcharge fees are to be used for the provision of increased security at the Auburn Municipal Airport (approved by Ordinance No. 5500 on January 16, 2001). For the purposes hereof, each tie -down consists of the structures /facilities necessary to accommodate one (1) regular sized light aircraft. Furthermore, the hangar doors to which the security surcharge applies includes all hangars located at the Auburn Municipal Airport, including those hangars built on land owned by the City but leased to private parties, and those hangars owned in a condominium type ownership. The above lease and security surcharge amounts are subject to applicable leasehold taxes, which shall be paid by the tenant. The total charges, including the above lease rates plus lease hold tax and surcharge shall be reflected in monthly billing rates. Tenants shall be given notice as required by Ordinance or lease agreements. The Airport Lease rates shall be effective January 1, 2014. Payments. Payments are due on the first of each month, past due as of the 5 and late as of the 15th. Payments not received by the 15th incur a $10.00 late fee. Payments not received after 30 days from the due date incur an additional $25.00 delinquency fee. Automatic gate electronic cards. One automatic gate electronic card will be issued to each City rental tenant free of charge. Any additional electronic cards requested by a tenant are subject to a $25.00 fee. A $15.00 fee refund applies to all serviceable returned cards. An additional $25.00 replacement fee will be assessed against the tenant for all lost or damaged electronic cards. All electronic cards must be returned to the airport at the time of lease expiration. Each lease shall include an initial payment of first and last months' rent plus a damage deposit in the amount of two times the monthly base rate. Each lease agreement shall also include terms that authorize the city to apply the damage deposit to outstanding charges on termination. 2. Daily Transient Parking (overnight) Tie Down $5.00 Open "T' $25.00 Page 19 Enclosed Hangar 1 $35.00 3. Base Parking Fee — Designated Spaces A base vehicle parking fee of $55.00 per month per designated space is charged. There are ten designated spaces available on a first come basis for pilots to park or store a vehicle for an extended period of time. All airport rules and regulations apply. A Vehicle Storage Permit must be completed and appropriate fees paid. The storage of vehicles is for convenience for the users of the Auburn Airport and is month -to- month. 4. Additional Airport Fees Gate Cards (each lease gets one card at no charge. Additional $25.00 cards cost $25.00. A $15.00 refund applies to all serviceable returned cards.) Aeronautical Business License (includes listing of your business on $250.00 airport signs and airport webpage.) Hangar Waitlist Fee $50.00 Page 20 E. POLICE DEPARTMENT FEES (Per Ordinance No. 5715 amended by Ordinance No. 6216, 5819, Resolution No. 3797, Resolution No. 3953, Resolution No. 4117, Resolution No. 4272, Resolution No. 4424, Ordinance 6216, Ordinance 6276, Resolution No. 4552, Resolution No. 5016, and Resolution No. 5114. False Alarm fees per Ordinance No. 6216 amended by Ordinance Nos. 6252 and 6345.)) Type Fees Police Report/Collision Report (fee not charged where $13.25 requested by victim or party involved) Visa Letter $10.00 Fingerprinting Fees (fee not charged where taking of $15.00 /card fingerprints is required by city) Laminated Concealed Pistol License $3.50 Annual Alarm Registration Fees: Residential $24.00 Commercial $24.00 Residential Low Income Senior Citizen /Disabled Citizen $12.00 Late Registration Fee $25.00 Auburn Security Alarm License $10.00 /each registered alarm user to a maximum of $100.00 annually Late License Fee $25.00 Reinstatement Fee $100.00 plus $10.00 /permitted user False Alarm Service Fees Burglar False Alarm Service Fee* $100.00 Robbery, Panic and Burglary Crime in Progress False $200.00 Alarm Fee* $200.00 Supplemental Fee for Non - permitted Alarm System, each alarm $100.00 Fee for false alarm caused by Monitoring Company or Alarm Installation Company employee $100.00 First Dispatch Report during time of suspension Each dispatch thereafter $25.00 Late Fee $25.00 Appeals $25.00 *The alarm administrator will waive the first false alarm fee following the installation of an alarm system at a particular address. Page 21 F. CITY CLERK FEES (Per Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797, Resolution No. 4244, Resolution No. 5016, and Resolution No. 5114.) Type Fees for public records — collection Non - certified copies of public records Certified copies of public records Scanning paper copies to PDF CD duplication DVD duplication Fees for Auburn City Code book and supplements Copy of Auburn City Code book (with latest supplement) Supplements to the Auburn City Code book Page 22 Fees $0.15 per page plus postage $5.00 per page plus copying fees $0.15 per page $5.00 per disk $10.00 per disk $100.00 per code book $11.00 per copy G. CITY CEMETERY FEES (Per Ordinance 5715, Resolution No. 3797, Resolution No. 3953, Resolution No. 4027, Resolution No. 4103, Resolution No. 4117, Resolution No. 4272 Resolution No. 4424, Resolution No. 4552, Resolution No. 4675, Resolution 4778, Resolution No. 4880, Resolution 5114, Resolution No. 5134 and Resolution No. 5181.) Type Fees Graves Section 9A and 9B 21695.00$27295.00 All other adult graves $300.00 Child's Place $ 4,590.00 Double Depth (includes 2 burial spaces / 2 liners) $4,995.00 each Section 9A and 9B (Quads and Upright monument plots) $9,995.00 each Section 9B (Plaza Estates) Ground Cremation Plots Centennial Um Garden (single) $995.00 Centennial Um Garden (double) $17895.00 Section 9 Upright Section Um Plots (up to 4 urns) $37195.00 Niches Mausoleum (top rows available only) — single $ Sold Out $ 2,195.00 Centennial Columbarium II (1 or 2 urns) — Row 3 Middle $ 17895.00 Centennial Columbarium II (1 or 2 urns) — Row 4 Bottom Chapel of Memories — Interior Niches* Range From 12 x 12 Single $27695.00 - $37995.00 12 x 18 Double $37695.00 - $67495.00 12 x 24 Family (up to 3 urns) $67995.00 - $87695.00 *The above niche prices include one bud vase per niche. Inurnment will be $595.00 per occasion. See guidelines for additional pertinent information. A single inscription on the glass front is $225.00 plus tax. Urn's to be purchased separately. Chapel of Memories — Exterior Niches* Rows 4, 57 & 6 $27695.00 Rows 2 & 3 $27295.00 Rows 1, 77 & 8 $17895.00 *If the niche (external) is to be used as a double niche, the inurnment, inscription and tax will be due when a second urn is placed. (Row 1 is the bottom row) OVERTIME WILL BE CHARGED AT $175.00 PER HOUR AFTER 4:30 P.M., MONDAY THROUGH FRIDAY. THE SATURDAY SERVICE CHARGE IS $795.00 FOR FULL INTERMENT AND $425.00 FOR CREMATION SERVICES. Extended Land Use $495.00 Memorial Plaque - $175 additional for inscription + tax $295.00 Services "Chapel of Memories" rental for services $ 295.00 Opening and Closing — Ground Burials Liner/Vault $17295.00 Children's Place $295.00 Opening and Closing — Cremation ForestWalk Cremation Plot $695.00 Niche $595.00 Page 23 Opening and Closing — Entombment $895.00 Inscription $240.00 + tax Vault Installation $595.00 + tax Marker Services Flat Grass: Setting Fee $295.00 + tax Resetting Fee $150.00 + tax New Inspection Fee for outside sales $175.00 Upright Setting Fee $475.00 + tax Resetting Fee $325.00 Vase Setting Fee $45.00 + tax Recording Fee $100.00 Overtime Charge — per hour $175.00 Saturday Service Fee Full Interment $795.00 Cremation $425.00 Materials Flower Vases: (prices include vase setting fee) Standard $150.00 Deluxe Cast Zinc (gray or bronze zinc) $250.00 Deluxe Wall (brass) $250.00 Liners: Concrete Liner $695.00 + tax Mountain View Vault $1,295.00 + tax Vault Installation $595.00 + tax Double Depth $895.00 + tax Infant $200.00 to $800.00 + tax Urn Encasement $225.00 + tax Forestwalk Informal Cremation Garden Single 3' Single Ground Plot $1,295.00 Double 4' Double Ground Plot $2,195.00 - $3,995.00 Wishing Well Scattering $295.00 Biodegradable Urn $125.00 + tax Add for 2 nd Inurnment $595.00 Granite Memorials Start At $395.00 + tax Add for 2 nd Marker Inscription $240.00 + tax Page 24 Page 25 H. PARKS AND RECREATION (Per Resolution No. 3797 and amended by Resolution No. 3953, Resolution No. 4117, Resolution No. 4272, Resolution No. 4424, Ordinance No. 6276, Resolution No. 4552, Resolution No. 4880, Resolution No. 5016 and Resolution No. 5181.) Les Gove Building Resident Non - Resident 3 hour minimum $20.00 /hour $25.00 /hour Seven days a week 9 a.m. - 11 p.m. Les Gove Gymnasium Resident Non - Resident Gymnasium (athletics practice, birthday parties, etc.) $30.00 /hour $40.00 /hour + Hourly Facility + Hourly Facility Attendant Fee Attendant Fee When Required When Required Gymnasium (tournaments, trade shows, fairs, etc.) $60.00 /hour $75.00 /hour + Hourly Facility + Hourly Facility Attendant Fee Attendant Fee When Required When Required Damage Deposit $300.00 $300.00 Optional Cleaning Fee $275.00 $275.00 Senior Activity Center Resident Non - Resident Full Facility (includes basic kitchen use) $80.00 /hour $100.00 /hour Available Friday evenings, Saturday and Sunday. Tables and chairs for up to 200 people max. 3 hr. minimum, 5:30 -11 p.m. (Friday eve.); 5 hr. minimum, 9 a.m. -11 p.m.(weekend) Additional cleanup time is available after 11 p.m. Rental Package Friday night & Saturday: 4 hours Friday and $1,200.00 $1,500.00 up to 12 hours of active use on Saturday Rental Package Full Day Saturday or Full Day Sunday: up to $1,000.00 $1,300.00 12 hours of active use on either day Millennium Rooms $30.00 /hour $40.00 /hour Friday only, 3 hour minimum, 5:30 - 11 p.m., 63 people per + Hourly Facility + Hourly Facility room maximum, 3 rooms available; weekend options available Attendant Fee Attendant Fee within 30 days or less When Required When Required Weese & Rotary Rooms $20.00 /hour $25.00 /hour Monday — Friday, 2 hour minimum, 5:30 - 11 p.m., 40 people + Hourly Facility + Hourly Facility per room maximum; weekend options available within 30 days Attendant Fee Attendant Fee or less When Required When Required *Additional Cleanup time available 11:00 p.m. — midnight $80.00 $100.00 Damage & Cleaning Deposit (for Full Facility and Millennium $300.00 $300.00 room rentals) without alcohol Damage & Cleaning Deposit (for Full Facility and Millennium $500.00 $500.00 room rentals) with alcohol ($1,000,000.00 excess liability insurance required) Optional cleaning fee (fee required with use of alcohol in $275.00 $275.00 facility) Commercial kitchen added on to existing room rental. $50.00 $50.00 Use of dishes, tableware, pots, etc. added on to an existing $50.00 $50.00 room rental. Commercial kitchen and cookware during Senior Center $15 /hr $20 /hr operating hours. Commercial kitchen and cookware when Senior Center is $25 /hr $25 /hr Page 26 closed (3 hour minimum) Basic Kitchen $25.00 1 $25.00 William C. Warren Building 3 hour minimum Seven days a week 9 a.m. - 11 p.m. Baseball /Softball /Grass Fields (Reservations made in 1.5 hour increments) Youth Adult Field Lights Field Maintenance Baseball /Softball/ Fastpitch Tournaments (Reservations made for 1 or 2 day tournaments) Youth Adult Field Lights Synthetic Turf Fields (Reservations made in 1.5 hour increments) Youth Adult Field Lights Game Farm Wilderness Park Campgrounds Daily, Open year round 7 nights maximum Game Farm Wilderness Park Day Camp Area Daylight hours, April 1 - October 15 Minimum Rental: 1 day Picnic Shelters Game Farm Park Single quadrant (max: 25) Monday - Friday Saturday - Sunday Full day Mon -Sun (Full Shelter) 1 -99 Mon -Sun (Full Shelter) 100 -199 Mon -Sun (Full Shelter) 200+ (must also rent amphitheater) Amphitheater Isaac Evans Park Lea Hill Park Roegner Park Game Farm Wilderness Park Les Gove Park Sunset Park Mon -Sun Single Quadrant (max: 25) Mon -Sun (Full Shelter) 1 -99 Mon -Sun (Full Shelter) 100 -199 Mon -Sun (Full Shelter) 200+ Page 27 Resident $40.00 /hour Resident $10.00/1.5 hour $23.00/1.5 hour $30.00/1.5 hour $30.00 per field 1 Day $700.00 $900.00 $30.00/1.5 hour Resident $45.00/1.5 hour $60.00/1.5 hour $30.00/1.5 hour Resident $25.00 /night Resident/ Non - Resident $75.00 /day Non - Resident $50.00 /hour Non - Resident $13.00/1.5 hour $30.00/1.5 hour $30.00/1.5 hour $30.00 per field 2 Day $1,000.00 $1,300.00 $30.00/1.5 hour Non - Resident $60.00/1.5 hour $75.00/1.5 hour $30.00/1.5 hour Non - Resident $25.00 /night Non - Profit $50.00 /day Auburn residents Non - residents Half Day* Full Day* Half Day* Full Day* $30.00 $50.00 $40.00 $65.00 N/A N/A N/A N/A $120.00 $200.00 $150.00 $250.00 $180.00 $300.00 $225.00 $375.00 N/A $375.00 N/A $475.00 $75.00 $125.00 $100.00 $175.00 $60.00 $100.00 $75.00 $125.00 $60.00 $100.00 $75.00 $125.00 $60.00 $100.00 $75.00 $125.00 $60.00 $100.00 $75.00 $125.00 $60.00 $100.00 $75.00 $125.00 $30.00 $50.00 $40.00 $65.00 $120.00 $200.00 $150.00 $250.00 $180.00 $300.00 $225.00 $375.00 NA $375.00 NA $475.00 Plaza Park * Resident Group Non - resident Group Hourly rate $60.00 $75.00 Full day rate $360.00 $450.00 * Additional hourly fees amy be applied based on event/staffing needs Rental Rate Schedule for Auburn Ave Theater Resident Non - Resident Weekdays Mon -Thur $170.00 $215.00 Weekend Days (Fri., Sat., and Sun.) $270.00 $340.00 Rate Schedule considers one day to be an 8 hour block of time. Damage deposit. The terms and conditions for full or partial refund of deposit apply to approval of Check -Out List, including theater, equipment plot restoration. $300.00 $300.00 Hourly commercial rate for meetings 2 hour min. for "4 -wal" only of lobby, auditorium, and stage $35.00 /hr $45.00 /hr Equipment not included: Use of any theatrical equipment additional charge $30.00 /hr $40.00 /hr $1,000,000 excess liability insurance required Upon request Upon request Custodial Fee $130.00 $130.00 Sound & Light Technician $25 /hr $25 /hr Stage Hand $12 /hr $12 /hr Rental Rate Schedule for Commercial Filming Resident Non - Resident Permit Fee $50.00 Still Photography /Training and Industrial Films, etc $50.00 per 1/2 day $100.00 per day Broadcast, Film, TV, Commercial, etc. $75.00 per 1/2 day $150.00 per day Electricity/Water Access, Park Maintenance Staff, Vehicle Access Hourly staff cost Damage Deposit $100.00 Impact Fees: Park Impact Fees $3,500.00 per residential dwelling unit Page 28 MULTIMEDIA DUPLICATION (Per Resolution No. 3953 and Resolution No. 4552.) Product Cost DVD Copy $10.00 per disk CD Copy $5.00 per disk Page 29 J. INFORMATION SERVICES AND GIS14 (Per Resolution No. 4272, Ordinance 6276, Resolution No. 4552, and Resolution No.4593 .) Much of the City's geographic data is available for sale per the prices below plus Washington State sales tax. A signed public records request form is required. Most public records requests can be completed within seven to ten business days and will be delivered in ESRI Shapefile format without Metadata. Product Cost Maps Existing Map $5.00 + tax Custom Maps (any non - existing map) $50.00 per hour15 + tax Data Digital Data Requests $50.00 per hour 16 + tax Miscellaneous CD -Rom $5.00 + tax All other requests for data or information not specifically listed $50.00 per hour + tax 14 Hourly charge to complete any of the below (one hour minimum charge). 15 Hourly charge includes the cost of processing and providing custom map requests. 16 Hourly charge includes the cost of processing and providing digital data requests. Page 30 K. WAIVER OF FEES (Per Resolution No. 5181). 1. The Mayor is authorized to waive any fees for permits, licenses, publications and actions as authorized by Sections 2.03.030, 5.10.030 and 12.60.020 of the City Code. 2. The Mayor is also authorized to reduce, and is vested with to discretion to reduce in compelling cases, by up to 50% any fees for permits, publications and actions where the applicant — the party responsible for payment of such fees — is an organization exempt from taxation under 26 US 501(c)(3), and where the permit(s), publication(s) and /or action(s) relate directly to the provision of charitable services to residents of the City of Auburn. Charitable services are defined as events or services provided to the residents of Auburn free of charge and where the City is a sponsor of the specific event or service. For the purposes hereof, "compelling cases" mean instances where there is an extraordinary need (greatly beyond current and ordinary need) for the charitable services that would be able to be provided. The intent of this authorization is to empower the Mayor with sole discretion to waive some fees in unique situations where there is a greatly increased need for new charitable services to be provided, and where the reduction of fees to the City will not detrimentally impact the City's ability to provide municipal services. This waiver does not include Impact Fees, System Development Charges, any fees related to Franchise or Public Way Agreements, Right -of -way Vacations, Right -of -Way Use Permits, Facility Extensions, Police Department Fees, Animal Licensing Fees and Penalties, Banner Permit Fees, or Cemetery or Parks fees. Page 31