HomeMy WebLinkAbout5352 RESOLUTION NO. 5 3 5 2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF AUBURN, WASHINGTON, AMENDING SECTION B,
ENGINEERING AND PUBLIC WORKS FEES, OF THE
CURRENT CITY OF AUBURN MASTER FEE SGHEDULE,
ADDING A NEW SUBSECTION 15 - MITIGATION AND
IMPACT FEES FOR EXEMPT WELLS
WHEREAS, the City of Auburn has a Master Fee Schedule adopted via resolution
by the City Council for permits, licenses, publications and actions; and
WHEREAS, Section B of the Master Fee Schedule specifies fees for the
Engineering and Public Works Fees; and
WHEREAS, in the 2018 Legislative Session, the Washington State Legislature
passed Engrossed Substitute Senate Bill (ESSB) 6091, relating to ensuring that water is
available to support development; and
WHEREAS, among the provisions of ESSB 6091 that may impact some
development within the City of Auburn corporate limits are the following:
• The bill establishes that properties that propose to use new permit-exempt
groundwater wells that are constructed on or after January 19, 2018, will be
authorized through compliance with Section 203 of ESSB 6091, even though
there may be potential impact to closed water bodies or impairment of instream
flows.
• The bill requires the Department of Ecology (Ecology) to develop a watershed
restoration and enhancement plan process for in the Water Resource
Inventory Areas (WRIA) for the Duwamish-Green (WRIA 9) and Puyallup-
White (WRIA 10) basins.
• The bill establishes a fee of $500, which fee may be periodically updated 6y
the watershed restoration and enhancement plan process, for each new
Resolution No. 5352
February 23, 2018
Page 1
permit-exempt withdrawal for a domestic purpose in the WRIAs for which a
watershed restoration and enhancement plan process will be established.
� The bill establishes a maximum daily withdrawal of 950 gallons per day per
connection, as calculated on an average annual basis, for new permit-exempt
withdrawals for a domestic purpose in the WRIAs for which a watershed
restoration and enhancement plan process will be established; except that in
case of a drought emergency order, the maximum withdrawal shall be reduced
to 350 gallons per day for indoor use only.
• The bill establishes that the property shall manage stormwater onsite to the
extent practicable by maximizing infiltration, including using low impact
development techniques.
• The bill establishes that the city issuing a building permit for a property using a
permit-exempt well shall record the water supply restrictions on the property,
report annually to the Department of Ecology (Ecology) the number of such
building permits issued, and transmit annually to Ecology $350 of each fee
collected.
WHEREAS, it is appropriate that the city of Auburn fee schedule be amended
to provide for the collection of a $500.00 fee for properties that will be served by a
new permit-exempt wells drilled on or after January 19, 2018, in accordance with the
provisions of ESSB 6091.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Section B of the fee schedule of the City of Auburn is amended as
provided in Exhibit "A", attached hereto.
Section 2. That the Mayor is authorized to implement such administrative
procedures as may be necessary to carry out the directives of this legislation, including
Resolution No. 5352
February 23, 2018
Page 2
for procedure for the collection of a $500.00 fee for properties that will be served by a
new exempt wells drilled on or after January 19, 2018, in accordance with the provisions
of ESSB 6091, with $350.00 of which to be sent to the Washington State Department of
ecology for mitigation and enhancements in the drainage basin, and the remaining
$150.00 being retained by the City.
Section 3. That this Resolution shall take effect and be in full force upon passage
and signatures hereon.
DATED and SIGNED this ��day of , 2018.
CITY OF AUBURN
ANCY BA S, MAYOR
ATTEST:
��
Danielle E. Daskam, City Clerk
APPROVED AS TO FORM:
�
D iel B. Hei , City ttorney
Resolution Na 5352
February 23, 2018
Page 3
,
EXHIBIT "A"
B. ENGINEERING AND PUBLIC WORKS FEES
s �,�m�.,-ew 'r� ^S �v� �� t f ,�.-wr-r- sm 7' '"�.e, �,�., .�X�.� ! �r *,°c: ;�-��'
�1 ����Transp4rtation��Impact��Fee, Rate F 5che�,ule J� (Per�`�Orr�rna�r�e�'�� ��`6����� �rr� ��ed ��y�
�� ;:��sdlutro'n�No';�3953,�Qrd►n"�ancey,No G 6005, Res�"olut�on��No�4103;,Resalcr�i �1���{�� p���1�� �x
�`i�s����964,�Re'so%iticin�lllo.i�5�14,"f?esolut�on�No���5y2�81;Resolutro�f�No":52���� ��.;� �� ��
5`anr ��s „��;�V;. �3?J��,ry`
.� � .. _ _ ._.__ ._ _ � . ___ _ __ . ...
ITE
Land
Use Independent Trip Non-Downtown Downtown Fee
Land Use Code Variable Rate Fee Rate Rate
Industrial
General Light 110 sf/gfa 0.97 $8.02 -
Industrial
-- _ _
General Heavy 120 sf/gfa 0_68 $6.30 -
Industrial
Industrial Park 130 sf/ fa 0.85 $7.03 -
__ __ _ _
Manufacturin 140 sf/ fa 0.73 $3.62 -
____. _ _ _.
Warehousin 150 sf/ fa 0.32 $3.70 -
_ __ _ _
Mini- 151 sf/gfa 0.26 $1.98 -
Warehouse/Stora e
Residential
Single-Family 210 du 1.00 $4,537.89 $3,675.69
detached
Multi-Famil 220-233 du 0.62 $2,974.26 $2,409.15
Mobile Home 240 du 0.59 $2,141.88 -
- - --
Senior Housin 251, 252 du 0.27 $980.18 $793 95___ __ .._
Lod in
_ _ __ _
Hotel 310 room 0.60 $3,111.69 $2,520.47
Motel 320 room 0.47 $2,437.49 -
Recreational
Movie Theater 444, 445 seat 0.08 $202.78 $15Q.06 __ _.._
Health Cfub 492, 493 sf% fa 3.53 $10.64 $7.88 __.
ITE
Land
Use Independent Trip Non-Downtown Downfown Fee
Land Use Code Variable Rate Fee Rate Rate
Institutional
Elementa School 520 student 0.15 $264.49 $195.73
_ _ _ _ - -
Middle School/Jr. 522 student 0.16 $448.08 $331.58
Hi h
_ _
Hi h School 530 student 0.13 $498.91 $369.19
__ __ _
Church 560 sf/ fa 0:55 $2.64 $1.95
Da Care Center 565 sf/ fa 12:34 $24.00 $17.76
Libra 590 sf/ fa 7.30 $12.07 $8.93
Resolufion No. 5352
February 23, 2018
Page 4
Medical
Hos ital 610 sf/ fa 0.93 $4.82 $3.91
__.__ _ _
Asst. Living, Nursing 254, 620 bed 0.22 $798.67 -
Home
Office
GeneralOffice 710' sf/gfa 1.49 $8.87 $6.03
715, 750
-
Medical Office 720 sf/ fa 3.57 $16.66 $11.33
Post Office 732 sf% fa 11.22 $18.55 $12.61
_ . ____ _
Retail
- - -
Free Standing g13 sf/gla 4.35 $8.53 $6.31
Discount Su erstore
Free Standing g15 sf/gla 4.98 $11.26 $8.33
Discount Store
-__- __
Hardware/Paint Store 816 sf/ la 4.84 $7.90 $5.84_
_. _ _.
Sho in Center 820 sf/ la 3.71 $6.67 $4.93
Car Sales-New 841 sfl la 2.59 $12.36 $9.14
Car Sales-Used N/A s ace � 0.28 $1,355.95 $988.61
Automobile Parts g43 sf/gla 5.98 $7.51 $5.56
Sales _
Tire Store 848 sf/ la 4.15 $8.52 $6.31_ _
___
Su ermarket 850 sf% la 9..48 _$16.52 $12.22
Convenience Market 851 sf/ la_ 52.41_ $34.45 $25.49
Home Improvement g62 sf/gla 2.33 $3.30 $2.44
Store
Drugstore w/o Drive- $$0 sf/gla 8.40 $8.70 $6.44
Throu h
Drugstore w/ Drive- 881 sf/gla 9.91 $11.14 $8.24
Throu h
Furniture Store 890 sf/ la 0.45 $0.47 $0.35
ITE
Land
Use Independent Trip Non-Downtown Downtown Fee
Land Use Code Variable Rate Fee Rate Rate
_ --- _ _._ _
Services
_.
Drive-in Bank 912 sf/ fa 24.30 $25.05 $18.54
____ _
Qualit Restaurant 931 sf% fa 7.49 $18.49 $13.68 ,
_____
High Turnover g32 sf/gfa 9.85 $16.74 $12.39
Restaurant
Fast Food Restaurant g33 sf/gfa 26.15 $34.58 $25.59
w/o Drive-Throu h
Fast Food Restaurant g34 sf/gfa 32.65 $43.18 $31.95
w/ Drive-Throu h
Resolution No. 5352
February 23, 2018
Page 5
Espresso Stand w/ g38 sf/gfa 75.00 $33.06 $24.47
Drive-Throu h
Auto Care Center 942 sf/ fa _ _ 3.11 $6.21 $4,60
Service Station_ 944 vf 13.87 $17,731.23 $13,121.11
Service Station w/ g45 vfp 13.51 $13,102.15 $9,695.59
Mini-Mart
Lakeland PUD (Per Ordinance No. 4867 as amended by Resolution No. 2955, Ordinance
No. 61 Z6 and Resolution No. 5181.
Detached Single-
Family Residential N%A du n/a $1,307.06 -
Unit
Attached Single-
Family/Multi-Family N/A du n/a $848.37 -
Unit
Senior-Famil Unit N/A du n/a $291.53 -
Commercial/Retail N/A sf/gfa n/a $3.39 -
Units �
Administrative Fee for Inde endent Fee Calculation $200.00
Notes:
A. Basic trip rates are based on the ITE Trip Generation Manual, 9th Edition.
B. Impact fee rate calculation is based upon the following methodology:
— Ba.sic Trip Rate = PM Peak Hour Trip Generation (per unit of ineasure)
— Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x PerTrip Fee/(divide
by) 1,000 for rate per square foot(where applicable) = Impact Fee Rate (per unit of ineasure)
C. For land uses not specifically identified here, trip generation rates could be de�i�ed from ITE
or a special study by the applicant.
D. sf/GFA= Square feet Gross Floor Area; sf/GLA= Square Feet Gross Leasable Area;
VFP=Vehicle Fueling Position.
E. Projects eligible for the Downtown Fee Rate are those located entirely within the boundary
idenfified on Fi ure 1.
Resolution No. 5352
February 23, 2018 •
Page 6
. f "��� r ��� ` � ,Na��r,av���, a a e�i,� � . �y ,
� o �
a�a���a � a� -"°' W�'4 -� -�.�' y� �k � , �v�+ i�''�'� .. �
i a� �'
�'td� .i�, � ;: �`� �.s. `� �,� � ..'� -
, ,..,.,_ . .. .� . em= �� .. ... . . . . .
ITE Land Independent Truck Impact Fee Rate
Land Use Use Code Variable Tri Rate er sf
_ _ __
Jndustrial
_.._ _ _
___ ._ _ _ _
Light Industry/IVlanufacturing 110, 130, sf/gfa 0.06 $0.12
140
Heav Indust 120 sf% fa 0.04 _ $0.07
_.___.
Retail
_ -- -
Shopping Center 820 0.01 ��
sf/ la 02
_ __ _ _ _
Car Sales 841 sf/ fa 0.09_ _ _ ___ _ __$0,14
_ .
Su ermarket 850 sf% fa 0,33_ __ $0.62
_
Free-Standing Discount Store 813, 815,
861; 863, sf/gfa 0.10 $0.19
864
___
Home Im rovement Store 862 sf% fa 0.37 $Q.70
_ _
ITE Land independent Truck Impact Fee Rate
Land Use Use Code Variable Tri Rate er s
- . .
Services
--
__._
Restaurant 931, 932_ sf/ fa 0,63 $1.18
Fast Food Restaurant 933, 934 sfL fa 2.87 $5.41
Notes:
A. ITE Land Use Code based on ITE Trip Generation, 9th Edition
B. Impact fee rate calculafion is based upon the following methodology:
- Truck Trip Rate = paily Truck Trip Generation (per unit of ineasure)
- Truck Trip Rate x Per Trip Fee = Impact Fee Rate (per unit of ineasure)
C. For land uses not specifically identified in the table, trip generation rates could be derived
from a special study by fhe applieant.
D. sf/ fa=s uare feet of ross floor area
�� yA'4:°�'� "p' L ' IIBI y� �. ,�, , , JiU' a-i � �P �t� . '�J '. I �' �.
y� ■ /��M �'Xy�'�-
+�'�,�i 'r,�Rt�Y�I a � I � � I�)'.��w�� �Ih� � ,y ��it �; §' 1,74 �I'��4� � y� .. �i�
�3 h�yN�`I'ICJ�i a � h � � 4 �1��s ��� 5
� �k- , h�'4�������31�Tt,ii�` ���#. ' �„ x ua-.� a ������3��`ewti� ,�"?� �'�`�+�"'��.�-���: � �4�li�) ��I
,.,ti�. �. a. .. � ...
_
Land Use Total Fire & EMS Adjustment Fire and EMS
Cost per Unit of (Revenue Credit) Impact Fee per
Development at 20% Unit of
Develo rnent
- . _._
Residential-All calculations below are er dwellin unit-.Total x Number of Units
__ _ _- - -- - -
Single Family, Duplex, Mobile $362.66 $72.53 $290.13
Home
--- ----
Multi-Famil $383.09 $76.62 __ _$306.47_ _ _
__ . _ __
_
Non-Residential-All calculations below are er s uare foof - Total x S_ uare Feef _ _ _
_ ---
Hotel/Motel $0.53, _ - --- $0.11 $0.42 __ __
----
Hos itaUClinic $1.05 $0.21 $0.84 _
Grou Livin $2.63 $0,53 $2.10 _
Office $0,29 $0.06 $0.23
Retail $0.62 $0.12 $0.50
Restauranf/Bar%Loun e $1.62 $0.32 $1.30
Resolution No. 5352
February 23, 2018
Page 7
Industrial/Manufacturin $0.11 $O.Q2 $0.09
Leisure/Outdoors $1.08 $0.22 $0.86
A riculture $0.71 $0.14 $0.57
_____w---_.
Church $0.38 $0.08 $Q.30
Schools/Colle es $1.07 $0.21 $0.86
_ _. ._
GovernmenUPublic Buildin s $1_.81. $0,36 $0.86
Casino $3.78 $0:77 $3.01
Jails $21.99 $4.40 $17.59 _
- --
. . ,, „ __ _�. � �� , , k �.
, ,
� w- xa �� .�� � ;, ��
,
� x, ��
� w � ' � iA ti` . '` �
_` � � �� �,
e
��� �, � h. ,. H S��I hN?� " „ i� r�� � � � =
� � B : , . � ; ..
� � ,.. ' � �-� "
� s �.R
n k,� ^ .a .. ..�.. -. , .,....
The Fa.cility Extension Application Fee is $569.00, plus $172.00 for each Facility (Water, Sanita_ry
Sewer, Storm Drainage, Street, private street and private storm systems within private streets).
Facility Extension Fees are the summation of the following categories (a+b+c+d), or $1,710:00,
whichever is greater.
a. For the combined linear footage of water, sewer, storm drainage and private storm drainage
within privafe streets:
The first 0 Iineal feet (LF)to 1000 LF is charged at$5.70 per LF plus,
The next 1001 LF to 2500 LF is charged at$2.90 per LF plus,
Any additional over 2500 LF is charged at $1.70 per LF.
b. For the linear footage of streets and private streets:
The first 0 LF to 500 LF will be charged at $7.10 per LF plus,
The next 501 LF to 1000 LF will be chacged at $4.20 per LF plus,
Any additional over 1000 LF will be charged at$1.10 per LF.
c. For non-linear extensions such as pump stations or traffic signals, the extension fee will be
determined. by the City Engineer based on an estimate of the City's labor Cosf associated with
the plan review, inspection, and administration of the application.
d. For that portion of the water or sewer facility located outside City Limits, but within existing
Gounty (King or Pierce) right-of-way, an additional fee of$457.00 plus $5.10 per LF of the
eombined water and sewer extension located in the existing County right-of-way applies.
Facility Extension Fees will be paid as follows:
a. Forfy pereent (40%) at the time of execution of the facility extension agreement.
b, Sixty percent (60%) upon the City's approval of the construction drawings and prior to the start
of construction.
__. _
Additional Review:
Each additional plan review beyond a 3'd review prior to plan approval will require an
additional fee of$527.00 be paid at the#irr�e of the additional review submittal. If the
review requires more than 8 hours of staff time to complete an additional fee of$66.00
per hour will be charged and must be paid prior to plan approval.
Resolution No. 5352
February 23, 2018
Page 8
_
_ ___
Addifional plan review required by changes, additions or revisions to plans during
construction will require an additional fee of$.2_64.00 be paid at the time the additional
review is submitted and prior to any review being completed. If the review requires more
than 4 hours of staff time to complete an additional fee of$66.00 per hour will be charged
and must be aid rior to 1an a roval.
u o - � � r� Ik p = �" .? 7+ a�v �
SP T4 ` � :�4 � �> � k r �
�'� ���� � � �, � .cu '�; .
� aI �
M b �*�_�.. �r�.��.I x�°, �5:� i I d,
��T�� e A— Banner $52.00
_ - ._ _
T e B—Short Term $62.0.0.
Type C— Long Term $258.00 for the 1 St year (or any term longer
than 30 days and less than 1 year)/$103.00
for each additional year (or portion thereofl
u to 5 ears
Type D — Hauling $10:3.00+estimated staff time @$52.00 per
hour
Street Closure—T e B or C $93.00
Sidewalk Closu"re—T e B or C _ _ $62.00
_. _ _ _
Parkin Clo,sure:.=T _e B or C__ _ _ $62,00
� � � ��r ��'��I��.ar .� ���� �� �� ... �x , � s
� � .�`" �i'��,�
am�,:� �
���.t �4��*a° +R" � � ` � � y �'2� � -
s �
..�.I'�g � a .r..iF t" � ��P'�;�I�.;��ti ,�i � �y ��.� �� `'�'s��6���li�"'s _
.. �, w. . � � . ,. �_v . . � � . ,w
Application%Renewal/Amendment Application Fee $5,150.00 Nonrefundable Initial Fee + plus
(ACC 13.36.040, ACG 20.06.120, ACC 20.06.130) the City's actual costs incurred in excess of
$5,150.00. Initial Fee is due at fime of
application any additional costs beyond the
initial fee is due prior to the effectiVe date of
the a reement.
_ _ _
Annual Administration Fee ACC 20.04,170 __. _ Actual Cit Costs
.
Annual CATV Franchise Fee (ACG 13.36.230) 5% of'Gross Revenue for the prior three
months.
_ - ---- _ ----- - _
- - ---
Other Annual Franchise Fee (ACC 20.06.100) Statutorily Permissible Percent of Gross
Revenue
. � ^ i aroil a !� e �'i� ?�". . �,.. � =- ,�;� �. a
� � "�� ��►� � :8a����� �` ��°
�
� �a�1�� ��II ' a A�Ir�� � aw yi ° �f �F'���G���� y a ' s`0 i �,��.
i ht Irr„�s z'` �r,��i p,,9 N . ' o , ��
� '�r� ����� b"�G�r � .t"� "4��- �� � � ` �. :
�$� � � �€°'t �k�.�-u��a� .�r,�� � � _��'w.!I!��"��'.,�.�.«ti "i _ � �'a..i x a�
,..+. - �. .. _
Application%Renewal Application Fee (ACC $5,150.00 nonrefundable Initial Fee + plus
20.04.020, ACC 20.04.120) � the City's actual costs incurred in excess of
$5,150.00. Initial Fee is due at time of
application any additional costs b.eyond the
initial fee is due prior#o the effective date of
the a reement.
Annual Fee ACC 20.D4.170 Actual Cit Costs _.____
� ,� w � _ -
� ; �� �� �
F � � �
�
t
`" � � � " "�I� �� � �� '�, " � �� � i� �
' , �,. � � � .
� ti d�i�� � ' �;� w =. ��� o ����. ��P���
�A lication F�ee� �$1,545.�00�
_ _ . _
Land Value Gom ensation Per ACC 12.48.085
____ _ _ _ _ _
� ����� � � n . u � � o-
� f m r � , r �r a
�� �t�mMm,-., i,.,,:a��,W, ,i� ,�ar'P _ I r� .,� . �'i�e�p��,,.�� ki� s," ':�I�"bd � ( (� � � �} . ir � ��k�s�4J �, 's `` ,.r
� ��C��„ � F ,��� � ��h� �.,, 1�� r���.�M �� A��f r, �� :�,,+,���y i t�i �,��G ^ � �I��' , � ��� ���i�����-'�K �;d";�
��` x�� � : � °� � „��,� a � � , �i��a'�a �i r���y i'n��. ��# � � ,
q� r ��'��������k���a }'. ' ;� ���,i ��.���7�i � I xs� ��¢�����ld���)d� !� `� � •�£'` �_��� _
' � ���
' � � � ,*�
,„�� 6 �, b � �'6��
�'� �1t5� ` .s ;a;" nr "%s�+, - 4`� a I , ek a
. .
� .��� � '. .� i�- �'a�..µ�(x" a �� � ..
,
�'�,(���°%�4 � e �� i i �.
� .,. .. . I�r �5 ,t�-.� :a� � � i � z
Resolution No. 5352
February 23, 2018 ,
Page 9.
a. Water Utility: Connection fees are comprised of a Permit Fee and the System Development
Char e as follows:
__ _
Meter Water Service Installation Permit Fee System
Size Existing Water Water Service&Meter Box Installed b Ci �z> Development
(In Service & Meter Paved Street Unpaved Street Charge(SDC)
Inches) Box�'>
'l<or less $375.00 $3,700.00�3> $2,150.00 $6,630:00
1 $430.00 _ $3,750.00�3� $2,200.00 $6,630:00
1-1/2 $1,010.00 $5 300.00�3> _ $3,800,00_ $22,077.00
2 $1,080.00 $5,750.00�3> $4,200.00 $35,336.00. _
3 Actual Cost B A licant B A licant $70,738.00
4 Actual Cost B A lieant B A licant $110,516.00
6 Actual Cost B A licant __ B A licant $220 968.00
8 Actual Cost B A licant B A licant $353,562.00 _
10 ActUal Cost B A licant B A licanf $508,298.00
�'>lnstallation of a water meter done by the City and the service either already exists or has been
installed by the Applicant.
�2�Fnstallation of the entire water service is done by the City.
�3�If ineter installation or retrofit involves installation of a fire s rinkler line, fee is Actual Cost.
_ _
b. Sanitary Sewer Utility: Connection fees are comprised of a Permit Fee and the System
Develo ment Char e as follows:
Type Pecmit Fee System Development
Charge (SDC)*
New Connection�4� $190.00 $2,460.00 Per RGE�S>
Grinder Fump (New $265.00 $2460.00 per RCE�S>
Connection �4> '
Tenant Improvement�4> $60.00 $2,460.00 Per net
increase in RCE's�5�
�°>All construction is the responsibility of the Applicant. If a new connection or repair requires work
within City right-of-way, a Construction Permit (EXC - see Section 11) is required in addition to the
Sewer Permit.
�S�RCE, Residential Customer Equivalent -An RCE shall be as defined by the King County
Department of Natural Resources.
NOTE: In addition to City sanitary sewer connection fees, King County will impose a sanitary
sewer connection fee (King County Capacity Charge)for improvements in King County's regional
sewer system, in accordance with King County Code 28.84.050. King County will bill customers
clirectl for this char e once the sewer work is com _lete, This char e is not to_be aid to the Cit .
Resolufion No. 5352
February 23, 2018
Page 10
c. Storm Drainage Utility: (Per Resolution No. 4566 and amended by Resolution No. 5181,
I?eso/cition No. 5255, and Resolution No. 5319.)
Connection fees are comprised of a Permit Fee and the System Development Charge as follows:
Type Permit Fee�s► System
Development
Char e SDC
Single Family Level 1 $215.U0 $1,229.00 per
Residence& Level 2 $415.00 ESU�e>'�
Duplexes(on
Individual
Parcels)' Level 3�'� Base Fee=$1,485.00 for up to 10,000 SF of disturbed area
Cumulative Additional Fee#1 =Base Fee+$415.00 for 10,001
SF up to 43,560 SF(1 Acre)of disturbed area
Cumulative Additional Fee#2=Cumulative Additional Fee#1 +
_..
$105.00 er whole_or. artial_Acre.disturbed over 1 Acre
Other Parcels" Level 1 $215.00 $1,229.00 per
ESU�s���
Level 2 $415.00
_
Level 3��� Base Fee=$1,485.00 for up#o 10,000 SF of disturbed area
Cumulative Additional Fee#1 =Base Fee+$415.00 for 10,001
SF up to 43,56U SF(1 Acre)of disturbed area
Cumulative Additional Fee#2=Cumulative Additional Fee#1 +
_ _ __ _ _
$105.00 erwhole or artial Acre disturbed over 1 Acre
�s>Permit levels are determined as follows:
• Level 1 permits are for all projects that are not located in a Critical Area and add orreplace less than 2,000
square feet of hard surface area; and/or disturb less than 7,000 square feet of land.
Note: Single-family residential projects disturbing 500 square feet or less may not require a permit.
o Level 2 permits are for all projects that add or replace 2;000 to 4,999 square feet of hard surtace area; or
disfurb 7,000 square feet or more of land.
o Level 3 permits are for all projects that add 5,000 square feet or more of hard surface area, or convert'/<
acres or more of native vegetation to lawn/landscaped area, or convert 2.5 acres or more of native
vegetation to pasture, or the new plus replaced hard surtace area is 5,000 square feet or more and the
value of improvements exceeds 50%of the assessed value of existing improvements.
��>Level 3 permit is calculated as the Base Fee plus the Cumulative Additional Fees descr'ibed herein.
�8>ESU, Equivalent Service Unit-A configuration of development of hard surfaces (which include impenrious
surfaces, permeable pavements, and vegetated roofs)estimated to contribute an amount of runoff to the
City's storm drainage system which is approximately equal to that created by the average single family
residential parcel. Although gravel surfaces are considered a hard surtace under ACC 13.48.010, existing
gravel surfaces are not included in the calculation of the SDCs. One ESU is considered equal to 2,600 square
feet of parcel coverage by hard surFaces. Per AGC 13.48.010.
'Reviser's Note: The verbiage from this box was inadvertently omitted from the fee schedule included in the
Council's published agenda packet.
Resolution No. 5352 I
February 23, 2018
Page 11
_ _ _.._
__ ___
When calculating the total SDC, a credit will be applied for the existing hard surface area except existing
gravel surfaces (e.g., new total SDC minus calculated SDC for existing hard surFace area using the def.in.ition
of hard surface as given in ACC 13.48.010).
wM._ ,�—� �,�� w���� �� _ �� _ _„ ,� � ��., . _ . , ,,�.,�r
a�� a� �-.F
9��� ��_
4
.. �y � r +, �'(
�; ;
� �m � � �� �„ �„ r r � � , _
� � _*%,� "
m ���� x
,
�
.� v. u :� � g o.�. F: ,. ..
�� � ,`� � .,�.a ,�� I i9�' . � „�
s
.. . ,� . . � ..,..., , . . ��. _: . .
Fireline Connection Permit $140.00
__ .
H drant Permit and Ins ection Fee .$245 00
H drant Meter Monthl Rafe $48.04
- - ---
_
Fire H drant Meter V1lrench-_Refundable_De osit�'> $40,00
H drant Meter_with RPBA, Valve, and Wrench- Refundable De _osit�'>�2� $2,045.00
H drant Meter Water Use Char e if e ui ment not returned for final readin $700.00
--_ ____ _ _ _
Water Meter Test Fee, 2" or less $225.00
_ _ _ .
Water Meter Test Fee, reater than 2'' At Actual Cost
Water Meter Removal Fee 3/4'' to 1" - service line remains. _ $310 00_
Water Meter Removal Fee 1-1/2" to 2" = serviee I'ine remains _ $925.00
- ---- --
Water Meter Removal Fee 3"and_lar er_-. service line _remains At Actual Cost
1Nater Service Abandonrnent Permit (City abandons at main; removes meter $2,990.00
and box
Water Meter Relocation Permit by City Same as 1Nater
Service Installation
Permit Fee, see
9.a.
__ _ ._ _
Meter Damage/Tamper Repair Permit $500.00 plus
Meter Cost, if
- -- --- -
a licable
1Nater Service Alteration/Re air Permit on Private Pro ert b A licant $80.00
Backflow Permit for Premises Isolation internal or external $80.00
__ _ _ _ _ _
Re-Locate Fee if<45 da s from initiaf locates $200.00
Sitle Sewe� Re air Permif on P�ivate Pro ert $80,00
_ _ _
- - - -
Side Sewer Re air Permit in Ri ht-of-Wa .�3� ___$160.00_
- - _ _ _
Demolit'ion Ca Permit_ ca side sewer_before buildin demolifion $80.00
Side_Sewer Relocation/Re lacement Permit $130:00 �
Oil/V1/ater Se arator Permit $205.00
___. __.___
Grease Interce tor Permit�3� $205.00
Storm Draina e Re air Permit- Existin :Private S stem_on Private Pro ert ._:__ ____ __.__$80._QO_
Storm Drainage Repair Permit- Existing System in Public Right-of- $160.00
Wa /Easement�3�
_ _ _ _
Payback Administration Fees: (per Ordinance No. 5954)
Application Fee $515.00
Processing Fee $1,030.00
Area of Special Benefit Analysis $515.00
Transaction/Collection Fee $310.00
Recording Fee $84.00
Outside Professional Services_ _. . _ _ _. Time &__Materials_
Convenience shut off $25.OQ
Delin uent shut off $25:00
Resolution No. 5352
February 23, 2018
Page 12
Late charge 1% per month of
outstanding bill
or$15.00
minimum,
whichever is
reater
Unauthorized turn on/off $60.00
Delin uent meter ulf _ $65.00__
Unauthorized fire line or water hook up $100.00 a day
fne from date
of discove
Returned checks each $20.00
Refusal of access er da $30.00
Closin final read $30.00
New account setu $25.00
Bill tenant $25.00
_. _ _
After-hours water turn on/off $30.00
__
Escrow estimates $25.00
���If the equipment is not retumed or is retumed in a damaged condition,the deposit amount shall be forFeited.
�z>Each year,the hydrant meter with RPBA,Valve,and Wrench must be returned to City no later than December 1 fqr
mainfenance and final annual meter reading. The deposit amount shall be forfeited if the equipment is not retumedto the
City by the deadline.
�3�If repair or new construcfion requires work within City right-of-way, including a new connection to the City's system, a
Gonstruction Permit(EXC-see Section 11)is required in addition to the permit,
r e �t! r�'�5 '�C..aY,9 �"'w � t a r r aJ ux ,y;,d n u > �'�'"11� '� '
��11���.�o�n5tr��t�on�°'t�e ���:� ��clr���"nc�e� r9�5���?��,�R �_ � _ ��"3���ihc��F e�'ltitr'c�,n,�Alc���%���
�r'r�`�a�� t" ��afi��'��r��u��i�'� `���� ��r�'y � �r�, � a�m. �F r '�r�`�aq ,�,����� ���; �� �,�w�° `��;a*,���"i����;#��a a��h���, �, ..
�s���r�RcSO/Ut�OIi��N0:�4�44�4��, �e'S�iI'#i��"��Uo���,�3�'���. �,'����,u� �;�� °x,��� ,��.���N��� ���u
_ � , . n --�- - � -- �� �
Basic Fee BF $154_50 .
Hourly Inspeetion Rate (HIR):
Normal Business Hours $54.00
After Hours (includes weeknights, weekends, and holidays and will be $83.00
char ed at the after hours HIR x the duration of the work
_ __._ _. _
For Excavation Type Work:
Length of Excavation (feet) Additional Fee (AF)
31 = 100 feet of excavation length $54.00
101 —250 feet of excavation length $160.00
251 —500 feet of excavation length $267.00
501 — 750 feet of excavation lengfh $373.00
751 - 1000 feet of excav.ation len th $4$0.00
Fee Calculation:
Permit Fee = BF +AF (for the appropriate length of excavation)
If the excavation exceeds 1,000 linear feet
Permit Fee = BF + $480.00 + (HIR x (length of excavation — 1000/100)
For Non-Excavation Type Work: This work includes any work in the public right-of-way that is not
covered by any other permits and includes such things as overhead utility work, geotechnical
borings, horizontal directional drilling and vault installation.
Resolution No. 5352
February 23, 2018
Page 13
Permit Fee = BF + (HIR x Permit Duration in Days)
In Lieu of Fee: In lieu of the above standard rates, the city engineer or his/her designee may
calculate the fee based upon current labor rates for administrative and inspection staff after
developing an estimate of staff effort involved. For projects that are expected to involve significantly
more than 1,000 feet of street excavation or when the scope or duration cannot be accurately
estimated, the city engineer may establish a deposit account to manage permitee deposits in
advance of permit issuance for reimbursing actual labor costs of administering the permit. Such
deposit accounts will not be interest bearing and will be closed at the end of the permitted work
when a final accounting of the permit administration cost shall be calculated and a final bill or credit
issued fo the permitee.
� e —n a N�: �a��:M��i 7�nmiw�rirw.rtr e,��. � ,� - � { � .., .. �,-,.,.,y .-:
1,2 Mernor�al Sig Prograrn _ � ,�r���t rt �� N��'Sfi3�';y���r+dir�ance`�Na.��.8 4.��i V �Y � t� :�Icr������;
'rc�..,�i�'yY.; it G.:d21;; ��M�p.;u�.�s� ��'�"��� ',y�'`5:�z i�'"'„ '-: .`` .,�.M7j"I � ti�anA hi1p��I�1�lu I�II) ��i���al I���i� 7�r`*s:��'I,N;a�h ��` -�;��r nk� � ���i��'(�P 2�, '��.�. ,yy��+��'� L
�§�M91i�II ('� � F��h liwl�:k�16 �il�., ' r'� .���,.�Im4F�4 „�.�? , f�'d:;;isi'���i:i,�a 'I ��' ii.G,���- (I 41�4�td�!�'n��{��� {�w� .a,� �7 � .,.,i' ,4'�w' i�'P��3�� ,�u�,s,..�-,� i -;���..,
�ua��S°r�ti'��u��7 r.�P,V;.[±�1�'�i�!'��Y��a:A�.�'ws.����Ii ��;�rm. �k�t,,,, y n,i�i �i::�:�. .� a Ii�M �,.I;I.�I���!���kl�;!�G�Ii`��4�����klhu�illlli,ll'"�I9i�„���,�.�a^:;',..h�l�ed�u:�....u"dr���,� ..,, i tl".Y . R�r�L„i.� i��W���`a�`
. ,,. . ..,:.
n.,"m�
. . . . .... __ ... .
Memorial Si n $155.00
__ _ _ -
��i ,s.r.x�...•� i r u au�ux( r�i ' ^ µa..� ,i j� .fil Im .N N:,&a�i�.�,u t�� ^. d � �t .'� "�" Inhh�i•,. �^: � ,. ;i�� 1 rv�e h
�°13�5''pec�al���Per,m�t�•„�I�(�� Q�r ���h���N�:Y���5�8?�p���,�par�d�,a�end, d � ��Re$olui�� �.� �� � ��r��a.�
qt�."��',SI��IGI�Dw��r�l,l������,r�^t;�r�;�"v�� 1r/�����,�IL ����i�4� ,t;�'�`��y I�iliiheuyf��rv�"1`{�,Y't�t`�„Nn f/r�`t°Iit�+p*>�r.' iJ'°d`���etuh�*„'�.��;Rn��!Ji�IMii��r adN�'"��,'�77ryWP�Pry�, ll(�,r� �a�ll� ."t" �,.��'��(�p�'«
,`a"a..i���k����•:F�l1i7� 4��.���L1�������P���� �i����f�G��1{-��•dh��{�k�.N?'��R��Ip����'�tl�uU'.,Ifi�����All'�TCI'a;ilR�W y...� 9���� `t���al.�. ��9s+�(�'$YR���
Permit T e Base Fee Additional Per Linear Foot
--- _
Sidewalk $56.00 $1.10/foot for each foot over 25
linear feet
Residential Driveway $56.00 $1.70/foot for each foot oyer 20
linear feet*
Commercial Driveway $110.00 $2.20/foot for each foot over 48
linear feet*
___
- - _.
*Drivewa widths are based on the width of fhe drivewa _a _ron in the ri ht-of-wa .
14�'Street Payback�Agreer�rien�ss��,�,(Per Q�drn�nc� No s 6319,�Resotution�IVo�4�244-4;�anc"°��1�escilcit�on�r
,� No 5319 � , � � � � � � �,� ��� � �: ����
_.L. � "��,.�°d..< '' ���.mc�.�.��.�.F_x._�__ r� ,a � �.m =��'��-�«�,+°c�g-�. �p, � c�.- .����a '3'
A lication Fee $515.00
Processin Fee $1,030.00
Assessment Reimbursement Area Anal sis $1,030.00
Transaction/Collecfion Fee $310.00
Recordin Fee $84.00
_ _._
Outside Professional Services when needed Time and.Materials_
���...t,.r�l�l,°a��Qp�������1��w�� . !�`��r�•�=� �r� �*�a11Ya���'�.7rr���'�',�l��1�1�:/��tJ����T:�h�����+6�i�'Idi � .>� �,. 'NIi�I�
_ . �.._ . _-- . . .
... __._�--
Mitiqafion and Impact fees for properties that will be serued bv new 500.00
exem t wells drilled on or after Janua 19 2018.*
*$350_00 of the $500.00 fee shall be sent to the Washington State Department of Ecoloqv for
m'itiqation enhancements in the well's drainaqe basin, with the remaininq $150.00 to be cetained bV
the Cit to cover its administrative costs.
Resolwtion No. 5352
February 23, 2018
Page 14